Sample records for replace aging equipment

  1. Aging Aircraft Subsystems. Equipment Life Extension within the Tornado Program

    DTIC Science & Technology

    2000-10-01

    establish whether of trained personal. an equipment is already life expired or not. Maintenance documentation Repairs and concessions Existing...to be replaced equipment will lead over time to a degradation of the functional check seals. This means that the older the equipment stays inservice

  2. Prioritizing equipment for replacement.

    PubMed

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  3. Make sure your imaging equipment goes the distance.

    PubMed

    Halverson, K A

    1997-11-01

    Today's hospitals have invested a substantial portion of their capital budgets on the purchase of high-tech equipment--diagnostic imaging machinery, clinical laboratory apparatus, biomedical devices--and yet only half have developed strategies for taking care of that equipment as it ages. When do you replace it? When is it obsolete? How do you determine whether it is cost effective? Kenneth Halverson examines the steps to take to develop and implement a successful asset management program that will enable you to keep your high-tech equipment going.

  4. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  5. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  6. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  7. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  8. 46 CFR 153.1130 - Failure of slops discharge recording equipment; operating with, reporting failures, and replacing...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...

  9. 38 CFR 17.351 - Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Philippines § 17.351 Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center. Grants to assist the Republic of the Philippines in the replacement and upgrading of equipment and in...

  10. 38 CFR 17.351 - Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Philippines § 17.351 Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center. Grants to assist the Republic of the Philippines in the replacement and upgrading of equipment and in...

  11. 38 CFR 17.351 - Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Philippines § 17.351 Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center. Grants to assist the Republic of the Philippines in the replacement and upgrading of equipment and in...

  12. 38 CFR 17.351 - Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Philippines § 17.351 Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center. Grants to assist the Republic of the Philippines in the replacement and upgrading of equipment and in...

  13. 38 CFR 17.351 - Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Philippines § 17.351 Grants for the replacement and upgrading of equipment at Veterans Memorial Medical Center. Grants to assist the Republic of the Philippines in the replacement and upgrading of equipment and in...

  14. The effect of voice communications latency in high density, communications-intensive airspace.

    DOT National Transportation Integrated Search

    2003-01-01

    The Federal Aviation Administration (FAA) Next Generation Air-Ground Communications program plans to replace aging analog radio equipment with the Very High Frequency Digital Link Mode 3 (VDL3) system. VDL3 will implement both digital voice and data ...

  15. APS deposition facility upgrades and future plans

    NASA Astrophysics Data System (ADS)

    Conley, Ray; Shi, Bing; Erdmann, Mark; Izzo, Scott; Assoufid, Lahsen; Goetze, Kurt; Mooney, Tim; Lauer, Kenneth

    2014-09-01

    The Advanced Photon Source (APS) has recently invested resources to upgrade or replace aging deposition systems with modern equipment. Of the three existing deposition systems, one will receive an upgrade, while two are being replaced. A design which adds a three-substrate planetary for the APS rotary deposition system is almost complete. The replacement for the APS large deposition system, dubbed the "Modular Deposition System", has been conceptually designed and is in the procurement process. Eight cathodes will sputter horizontally on mirrors up to 1.5 meters in length. This new instrument is designed to interface with ion-milling instruments and various metrology equipment for ion-beam figuring. A third linear machine, called the APS Profile Coating System, has two cathodes and is designed to accept substrates up to 200mm in length. While this machine is primarily intended for fabrication of figured KB mirrors using the profile-coating technique, it has also been used to produce multilayer monochromators for beamline use.

  16. Management of medical technology: case study of a major acute hospital.

    PubMed

    Brown, Ian; Smale, Andrew

    2007-01-01

    This paper presents results of a Capital Equipment Management Plan undertaken at a major acute hospital in Australia. By classifying existing equipment using a threshold replacement value into Major and Minor items, detailed planning information was collected for 527 items of Major equipment representing 80% of the hospital's total equipment stock. A number of meaningful views of this significant asset base are presented, and a prioritisation method used to provide recommendations for future equipment replacement and acquisition for a 5 year planning period. The survey work to identify and document actual equipment items provides a convincing argument for the funding levels required for capital equipment replacement and acquisition, and evidence for the extent of technology reliance in modern health care facilities.

  17. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noel Duckwtiz

    2011-05-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. •more » Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.« less

  18. Bond Insurance Can Help Lower the Cost of Financing Your Facilities.

    ERIC Educational Resources Information Center

    Sockwell, Oliver R.

    1993-01-01

    For many colleges, universities, and teaching hospitals, the need to expand, renovate, or replace aging structures and equipment is crucial. Institutions need not be large and well known to tap nationwide capital pools. By using municipal bond insurance when issuing tax-exempt bonds for financing, they improve their credit rating and increase…

  19. Evaluation of the Training Centre Infrastructure Fund (TCIF). Final Report

    ERIC Educational Resources Information Center

    Human Resources and Skills Development Canada, 2009

    2009-01-01

    The Training Centre Infrastructure Fund (TCIF) was initially announced in Budget 2004 and represented an immediate measure of the broader Workplace Skills Strategy. TCIF was a three-year $25 million pilot project, designed to address the growing need for union-employer training centres to replace aging equipment and simulators that were not up to…

  20. Simulation Gaming in Construction: ER, The Equipment Replacement Game.

    ERIC Educational Resources Information Center

    Nassar, Khaled

    2002-01-01

    The Equipment Replacement simulation game can be used to explain the different effects of various equipment buy/sell strategies on the economic performance of construction companies. The probabilistic aspect of demand in the construction market is incorporated. The game is implemented using Excel and Visual Basic for Applications. (Author/SK)

  1. 30 CFR 75.504 - Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., reconditioned, additional, and rebuilt electric face equipment. 75.504 Section 75.504 Mineral Resources MINE..., used, reconditioned, additional, and rebuilt electric face equipment. On and after March 30, 1971, all new, replacement, used, reconditioned, and additional electric face equipment used in any mine...

  2. 30 CFR 75.504 - Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., reconditioned, additional, and rebuilt electric face equipment. 75.504 Section 75.504 Mineral Resources MINE..., used, reconditioned, additional, and rebuilt electric face equipment. On and after March 30, 1971, all new, replacement, used, reconditioned, and additional electric face equipment used in any mine...

  3. 30 CFR 75.504 - Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., reconditioned, additional, and rebuilt electric face equipment. 75.504 Section 75.504 Mineral Resources MINE..., used, reconditioned, additional, and rebuilt electric face equipment. On and after March 30, 1971, all new, replacement, used, reconditioned, and additional electric face equipment used in any mine...

  4. 30 CFR 75.504 - Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., reconditioned, additional, and rebuilt electric face equipment. 75.504 Section 75.504 Mineral Resources MINE..., used, reconditioned, additional, and rebuilt electric face equipment. On and after March 30, 1971, all new, replacement, used, reconditioned, and additional electric face equipment used in any mine...

  5. 30 CFR 75.504 - Permissibility of new, replacement, used, reconditioned, additional, and rebuilt electric face...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., reconditioned, additional, and rebuilt electric face equipment. 75.504 Section 75.504 Mineral Resources MINE..., used, reconditioned, additional, and rebuilt electric face equipment. On and after March 30, 1971, all new, replacement, used, reconditioned, and additional electric face equipment used in any mine...

  6. 49 CFR 573.11 - Prohibition on sale or lease of new defective and noncompliant motor vehicles and items of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... noncompliant motor vehicles and items of replacement equipment. 573.11 Section 573.11 Transportation Other... equipment. (a) If notification is required by an order under 49 U.S.C. 30118(b) or is required under 49 U.S... equipment) notification about a new motor vehicle or new item of replacement equipment in the dealer's...

  7. Wideband Communications Equipment, Ground Radio Communication, Space Comm Systems Equipment. 304X0/X4/X6. Appendix B - EF/A and Job Inventory Items by Equipment

    DTIC Science & Technology

    1990-05-01

    L0341 K ISOLATE MALFUNCTIONS TO DIRECTIONAL COUPLERS - 6 L0436 A REMOVE OR REPLACE TWTS - 6 M0443 A ALIGN DELAY EQUALIZER COMPONENTS - 6 M0447 A ALIGN...CONTROLS - 6 L0390 A PERFORM OPERATIONAL TESTS ON RECEIVER TRANSMITTER CONTROLS - 6 LO0O1 A PERFORM PHIS ON TWT SHF TRANSMITTERS - 6 L0410 A REMOVE OR...REPLACE DIRECTIONAL COUPLERS - 6 L0420 A REMOVE OR REPLACE LINE VOLTAGE REGULATORS - 6 L0435 A REMOVE OR REPLACE TWT SHF TRANSMITTERS - 6 L0436 A

  8. Technology assessment and requirements analysis: a process to facilitate decision making in picture archiving and communications system implementation.

    PubMed

    Radvany, M G; Chacko, A K; Richardson, R R; Grazdan, G W

    1999-05-01

    In a time of decreasing resources, managers need a tool to manage their resources effectively, support clinical requirements, and replace aging equipment in order to ensure adequate clinical care. To do this successfully, one must be able to perform technology assessment and capital equipment asset management. The lack of a commercial system that adequately performed technology needs assessment and addressed the unique needs of the military led to the development of an in-house Technology Assessment and Requirements Analysis (TARA) program. The TARA is a tool that provides an unbiased review of clinical operations and the resulting capital equipment requirements for military hospitals. The TARA report allows for the development of acquisition strategies for new equipment, enhances personnel management, and improves and streamlines clinical operations and processes.

  9. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... supporting acts of international terrorism) if the commodity to be repaired is an “aircraft” (as defined in... equipment controlled under ECCN 2A983 or related software controlled under ECCN 2D983. (vi) No replacement... object detection equipment controlled under ECCN 2A984 or related software controlled under ECCN 2D984...

  10. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... supporting acts of international terrorism) if the commodity to be repaired is an “aircraft” (as defined in... equipment controlled under ECCN 2A983 or related software controlled under ECCN 2D983. (vi) No replacement... object detection equipment controlled under ECCN 2A984 or related software controlled under ECCN 2D984...

  11. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... supporting acts of international terrorism) if the commodity to be repaired is an “aircraft” (as defined in... equipment controlled under ECCN 2A983 or related software controlled under ECCN 2D983. (vi) No replacement... object detection equipment controlled under ECCN 2A984 or related software controlled under ECCN 2D984...

  12. 34 CFR 395.6 - Vendor ownership of vending facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...

  13. 34 CFR 395.6 - Vendor ownership of vending facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...

  14. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Materials handling equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of...

  15. 47 CFR 17.56 - Maintenance of lighting equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... § 17.56 Maintenance of lighting equipment. (a) Replacing or repairing of lights, automatic indicators or automatic control or alarm systems shall be accomplished as soon as practicable. (b) The flash tubes in a high intensity obstruction lighting system shall be replaced whenever the peak effective...

  16. 49 CFR 557.3 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... interested person may file with the Administrator a petition requesting him to hold a hearing on— (a) Whether... safety-related defect in any motor vehicle or item of replacement equipment manufactured by him; (b... replacement equipment manufactured by him; (c) Whether the manufacturer has reasonably met his obligation to...

  17. Development of an approach to facilitate optimal equipment replacement : technical summary.

    DOT National Transportation Integrated Search

    1999-10-01

    The objective of the study was to determine a way or ways to assign an urgency rating to equipment that was currently in service but in need of replacement. This urgency rating must in some manner took into account the various costs associated with r...

  18. Association of market, operational, and financial factors with nonprofit hospitals' capital investment.

    PubMed

    Kim, Tae Hyun; McCue, Michael J

    2008-01-01

    Capital investments in the latest medical equipment and the replacement of aging facilities are critical decisions for sustaining hospitals' financial viability. A recent survey over the period 1997 to 2001 found that hospitals increased their capital expenditures by only 1%. The aim of this study is to gain insight into the changes in market, operational, and financial factors that may have influenced hospital capital investment during this period. The sample consisted of a panel of nonprofit hospitals operating between 1998 and 2001. Capital investment was measured on the basis of capital purchases for buildings, fixtures, and movable equipment during a fiscal year. The results suggest that liquidity-the availability of internal funds-is a critical determinant of capital investment in both urban and rural facilities. From a market perspective, findings indicate that growth in the over-65 population led to increases in the capital investment of rural hospitals. Financially, an increase in cash flow also was strongly related to a change in capital investment among urban facilities. Surprisingly, rural hospitals with aging plants and equipment had declining capital investment.

  19. Financing New Technologies, Equipment/Furniture Replacement, and Building Renovation: A Survey Report.

    ERIC Educational Resources Information Center

    Shirk, Gary M.

    1984-01-01

    Reports results of survey of methods used by 77 North American academic and public libraries to finance implementation of new technologies, replace equipment and furniture, and renovate buildings. Financing methods used, frequency of use, choice, and range of methods are discussed. Eight references and list of survey participants are appended.…

  20. 76 FR 51344 - Notice of Funds Availability for Section 514 Farm Labor Housing Loans and Section 516 Farm Labor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ...). Replacement of heating, ventilation and air conditioning (HVAC) equipment with Energy Star qualified heating, HVAC equipment. (3 points). Replacement of windows and doors with Energy Star qualified windows and... the third-party program's rating and verification systems. (2 points). Dated: August 11, 2011. Robert...

  1. 7 CFR 550.39 - Equipment replacement insurance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of... of equipment acquired with Federal funds in the event of loss or damage to such equipment. ...

  2. 7 CFR 550.39 - Equipment replacement insurance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of... of equipment acquired with Federal funds in the event of loss or damage to such equipment. ...

  3. 47 CFR 74.852 - Equipment changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment changes. 74.852 Section 74.852... Equipment changes. (a) The licensee of a low power auxiliary station may make any changes in the equipment that are deemed desirable or necessary, including replacement with certificated equipment, without...

  4. Analog to digital converter system for temperature monitoring -- B, C, D, DR, F, and H reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ballowe, J.W.

    1961-03-23

    This document discusses a proposal that certain presently installed reactor process water outlet temperature data logging equipment in subject reactors to be replaced with new functionally simplified equipment of a more adequate design. The primary purpose of the proposed installation is to replace existing equipment which is obsolete and in three reactors is worn out to the point where the equipment is out of service frequently for periods of time up to 8 hours or more. The new equipment will provide reliable process tube temperature information for use in the functions of reactor control and product accountability. Based upon anticipatedmore » incremental production gains resulting from use of the new equipment, the amortization period for the project is calculated at 2.7 years.« less

  5. Energy consumption and load profiling at major airports. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kennedy, J.

    1998-12-01

    This report describes the results of energy audits at three major US airports. These studies developed load profiles and quantified energy usage at these airports while identifying procedures and electrotechnologies that could reduce their power consumption. The major power consumers at the airports studied included central plants, runway and taxiway lighting, fuel farms, terminals, people mover systems, and hangar facilities. Several major findings emerged during the study. The amount of energy efficient equipment installed at an airport is directly related to the age of the facility. Newer facilities had more energy efficient equipment while older facilities had much of themore » original electric and natural gas equipment still in operation. As redesign, remodeling, and/or replacement projects proceed, responsible design engineers are selecting more energy efficient equipment to replace original devices. The use of computer-controlled energy management systems varies. At airports, the primary purpose of these systems is to monitor and control the lighting and environmental air conditioning and heating of the facility. Of the facilities studied, one used computer management extensively, one used it only marginally, and one had no computer controlled management devices. At all of the facilities studied, natural gas is used to provide heat and hot water. Natural gas consumption is at its highest in the months of November, December, January, and February. The Central Plant contains most of the inductive load at an airport and is also a major contributor to power consumption inefficiency. Power factor correction equipment was used at one facility but was not installed at the other two facilities due to high power factor and/or lack of need.« less

  6. 41 CFR 109-38.402-50 - Prompt disposal of replaced motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... replaced motor vehicles. 109-38.402-50 Section 109-38.402-50 Public Contracts and Property Management... REGULATIONS AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.4-Use and Replacement Standards § 109-38.402-50 Prompt disposal of replaced motor vehicles. A replaced motor vehicle...

  7. Ideas To Save Electricity

    ERIC Educational Resources Information Center

    Gardner, John C.

    1974-01-01

    Significant energy savings can be effected through stopping obvious waste of water, electricity, and heat; purchasing equipment with the correct voltage and horsepower; equipment maintenance; and redesigning or replacing obsolete or inefficient equipment. (Author/MF)

  8. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training; disposal of old equipment; test equipment... a replacement system, such as equipment and engineering expenses. C may not exceed $250,000 per...

  9. Fleet replacement modeling : final report, July 2009.

    DOT National Transportation Integrated Search

    2009-07-01

    This project focused on two interrelated areas in equipment replacement modeling for fleets. The first area was research-oriented and addressed a fundamental assumption in engineering economic replacement modeling that all assets providing a similar ...

  10. 7 CFR 58.229 - Filler and packaging equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction and all parts, including valves and filler heads accessible for cleaning. New or replacement equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  11. 38 CFR 17.352 - Amounts and use of grant funds for the replacement and upgrading of equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2011-07-01 2011-07-01 false Amounts and use of grant funds for the replacement and upgrading of equipment. 17.352 Section 17.352 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Grants to the Republic of the Philippines § 17.352...

  12. 38 CFR 17.352 - Amounts and use of grant funds for the replacement and upgrading of equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Amounts and use of grant funds for the replacement and upgrading of equipment. 17.352 Section 17.352 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Grants to the Republic of the Philippines § 17.352...

  13. 38 CFR 17.352 - Amounts and use of grant funds for the replacement and upgrading of equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2012-07-01 2012-07-01 false Amounts and use of grant funds for the replacement and upgrading of equipment. 17.352 Section 17.352 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Grants to the Republic of the Philippines § 17.352...

  14. 38 CFR 17.352 - Amounts and use of grant funds for the replacement and upgrading of equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2014-07-01 2014-07-01 false Amounts and use of grant funds for the replacement and upgrading of equipment. 17.352 Section 17.352 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Grants to the Republic of the Philippines § 17.352...

  15. 38 CFR 17.352 - Amounts and use of grant funds for the replacement and upgrading of equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2013-07-01 2013-07-01 false Amounts and use of grant funds for the replacement and upgrading of equipment. 17.352 Section 17.352 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS MEDICAL Grants to the Republic of the Philippines § 17.352...

  16. Novel Repair Technique for Life-Extension of Hydraulic Turbine Components in Hydroelectric Power Stations

    NASA Astrophysics Data System (ADS)

    Hiramatsu, Yoichi; Ishii, Jun; Funato, Kazuhiro

    A significant number of hydraulic turbines operated in Japan were installed in the first half of the 20th century. Today, aging degradation and flaws are observed in these turbine equipments. So far, Japanese engineers have applied NDI technology of Ultrasonic Testing (UT) to detect the flaws, and after empirical evaluation of the remaining life they decided an adequate moment to replace the equipments. Since the replacement requires a large-scale field site works and high-cost, one of the solutions for life-extension of the equipments is introduction of repair services. We have been working in order to enhance the accuracy of results during the detection of flaws and flaws dimensioning, in particular focusing on the techniques of Tip-echo, TOFD and Phased-Array UT, accompanied by the conventional UT. These NDI methods made possible to recognize the entire image of surface and embedded flaws with complicated geometry. Then, we have developed an evaluation system of these flaws based on the theory of crack propagation, of the logic of crack growth driven by the stress-intensity factor of the crack tip front. The sophisticated evaluation system is constituted by a hand-made software and database of stress-intensity factor. Based on these elemental technologies, we propose a technique of repair welding to provide a life-extension of hydraulic turbine components.

  17. Approved Airport Equipment

    DOT National Transportation Integrated Search

    1997-06-06

    This advisory circular (AC) administratively cancels AC 150/5345-1U, Approved : Airport Equipment dated February 20, 1989, and directs replacement of any : reference to AC 150/5345-1 with AC 150/5345-53, Airport Lighting Equipment : Certification Pro...

  18. 78 FR 37760 - Electrical Equipment in Hazardous Locations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... floating facilities engaged in OCS activities, however, equipment could be installed in hazardous locations... composition and the extent of equipment replacement. The myriad types of MODUs and facilities operating on the.... USCG-2012-0850] RIN 1625-AC00 Electrical Equipment in Hazardous Locations AGENCY: Coast Guard, DHS...

  19. 49 CFR 193.2401 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Equipment § 193.2401 Scope. After March 31, 2000, each new, replaced, relocated or significantly altered vaporization equipment, liquefaction equipment, and control systems must be...

  20. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  1. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  2. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  3. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  4. 30 CFR 75.1914 - Maintenance of diesel-powered equipment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...

  5. The replace repair decision for heavy equipment.

    DOT National Transportation Integrated Search

    2004-01-01

    The fleet of equipment operated by the Virginia Department of Transportation (VDOT) constitutes a large investment, on the order of half a billion dollars. A means of identifying earlier and more accurately those pieces of equipment whose timely repl...

  6. KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins and Mission Specialist Wendy Lawrence look over mission equipment in the Space Station Processing Facility. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins and Mission Specialist Wendy Lawrence look over mission equipment in the Space Station Processing Facility. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  7. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas works on equipment in the Space Station Processing Facility. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas works on equipment in the Space Station Processing Facility. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  8. Evaluation of Bluetooth as a replacement for cables in intensive care and surgery.

    PubMed

    Wallin, Mats K E B; Wajntraub, Samson

    2004-03-01

    In today's intensive care and surgery, a great number of cables are attached to patients. These cables can make the care and nursing of the patient difficult. Replacing them with wireless communications technology would facilitate patient care. Bluetooth is a modern radio technology developed specifically to replace cables between different pieces of communications equipment. In this study we sought to determine whether Bluetooth is a suitable replacement for cables in intensive care and during surgery with respect to electromagnetic compatibility. The following questions were addressed: Does Bluetooth interfere with medical equipment? And does the medical equipment decrease the quality of the Bluetooth communication? A Bluetooth link, simulating a patient monitoring system, was constructed with two laptops. The prototype was then used in laboratory and clinical tests according to American standards at the Karolinska Hospital in Stockholm. The tests, which included 44 different pieces of medical equipment, indicated that Bluetooth does not cause any interference. The tests also showed that the hospital environment does not affect the Bluetooth communication negatively. Bluetooth, a new radio technology transmitting at 2.4 GHz, was tested in a clinical setting. The study showed that a single Bluetooth link was robust and electromagnetically compatible with the tested electronic medical devices.

  9. 40 CFR 85.1412 - Maintenance and submittal of records for equipment certifiers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... original equipment being replaced; (4) A description of the quality control plan used to monitor production... taken in implementing the quality control plan, and any subsequent analyses of that data; and (6) All in... the equipment certifier has offered to sell its certified equipment for less than the life cycle cost...

  10. 40 CFR 85.1412 - Maintenance and submittal of records for equipment certifiers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... original equipment being replaced; (4) A description of the quality control plan used to monitor production... taken in implementing the quality control plan, and any subsequent analyses of that data; and (6) All in... the equipment certifier has offered to sell its certified equipment for less than the life cycle cost...

  11. Managing the replacement cycle of laser inventory.

    PubMed

    Davis, C E

    1992-01-01

    Medical lasers are quickly moving into the replacement phase of technology management. Barnes Hospital (St. Louis, MO) is using its laser team to define a process of planned laser replacement using the experience gained from traditional medical equipment replacement cycles, quality improvement principles and tools, and other formalized interdisciplinary teams. The process described in this paper has six basic steps: (1) A decision is made to request a replacement laser. (2) An appropriation request form is completed and submitted with the clinical and/or technical justifications. (3) Those requests initiated outside of the Clinical Engineering Department are reviewed by the Clinical Engineer/Medical Laser Safety Officer (CE/MLSO). (4) The CE/MLSO presents the requests to the hospital Laser Committee, and (5) then to the Laser Users' Group. (6) Finally, an Expenditure Authorization Committee reviews all capital expense requests, including those for replacement lasers, and allocates funds for the next fiscal year. This paper illustrates and evaluates the process, using an example from the review process for 1993 equipment purchases at Barnes Hospital.

  12. [Rehabilitation of women suffering chronic cystitis in the postmenopausal period with the use of an AMUS-01 - Intramag apparatus equipped with a Rektomassazher device].

    PubMed

    Azizov, A P; Azizova, P A; Beliaev, A A; Konova, A N; Raĭgorodskiĭ, Iu M

    2011-01-01

    The objective of the present study was to develop a rationale for the local treatment of chronic recurring cystitis in the postmenopausel period. To this effect, 76 patients at the mean age of 66.4 years with this pathology were examined and the data obtained were compared with observations of control postmenopausel women receiving traditional local substitution hormonal therapy. In the patients of the study group, this treatment was supplemented by intravaginal vibro-magnetotherapy and the conventional antibacterial therapy was replaced by local electrophoresis. All local physiotherapeutic procedures were performed with the use of a AMUS-01 - Intramag apparatus equipped with a Rektomassazher device an AMUS-01 - Intramag apparatus equipped with a Rektomassazher device. The immunological analysis of vaginal secretion coupled to bacterial and clinical investigations have demonstrated the advantages of the combined local treatment including physiotherapy. The integral efficacy index was by a factor of 1.8 higher than in the control group.

  13. NASA Shuttle Logistics Depot (NSLD) - The application of ATE

    NASA Technical Reports Server (NTRS)

    Simpkins, Lorenz G.; Jenkins, Henry C.; Mauceri, A. Jack

    1990-01-01

    The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.

  14. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  15. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  16. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  17. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  18. 10 CFR 34.27 - Leak testing and replacement of sealed sources.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Leak testing and replacement of sealed sources. 34.27 Section 34.27 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.27 Leak testing and replacement...

  19. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi, with the Japanese Aerospace Exploration Agency (JAXA), handles equipment that will be used on the mission. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi, with the Japanese Aerospace Exploration Agency (JAXA), handles equipment that will be used on the mission. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  20. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Charles Camarda (left) watches as Mission Specialist Andrew Thomas manipulates equipment that will be used on the mission. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Charles Camarda (left) watches as Mission Specialist Andrew Thomas manipulates equipment that will be used on the mission. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  1. Food Service Equipment. Third Edition.

    ERIC Educational Resources Information Center

    Jernigan, Anna Katherine; Ross, Lynne Nannen

    This book provides information that will help in purchasing the kind of food service equipment most useful in any given facility. Hence, it should be of value to architects, contractors, administrators, dietitians, managers, and others involved in remodeling a facility, replacing equipment, and/or improving the efficiency of food service…

  2. 15 CFR 14.34 - Equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 14.34 Section 14.34 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM ADMINISTRATIVE REQUIREMENTS FOR... shall be treated as program income. (e) When acquiring replacement equipment, the recipient may use the...

  3. 40 CFR 60.733 - Reconstruction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... § 60.733 Reconstruction. The cost of replacement of equipment subject to high temperatures and abrasion... facility” under § 60.15. Calciner and dryer equipment subject to high temperatures and abrasion are: end...

  4. 40 CFR 60.733 - Reconstruction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... § 60.733 Reconstruction. The cost of replacement of equipment subject to high temperatures and abrasion... facility” under § 60.15. Calciner and dryer equipment subject to high temperatures and abrasion are: end...

  5. 40 CFR 60.733 - Reconstruction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 60.733 Reconstruction. The cost of replacement of equipment subject to high temperatures and abrasion... facility” under § 60.15. Calciner and dryer equipment subject to high temperatures and abrasion are: end...

  6. 40 CFR 60.733 - Reconstruction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... § 60.733 Reconstruction. The cost of replacement of equipment subject to high temperatures and abrasion... facility” under § 60.15. Calciner and dryer equipment subject to high temperatures and abrasion are: end...

  7. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... metal particles. The wires in the curd knives shall be stainless steel, kept tight and replaced when..., shovels, scoops, paddles, strainers, and miscellaneous equipment shall be stainless steel or of material... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  8. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... metal particles. The wires in the curd knives shall be stainless steel, kept tight and replaced when..., shovels, scoops, paddles, strainers, and miscellaneous equipment shall be stainless steel or of material... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  9. Power Product Equipment Technician: Construction Equipment. Teacher Edition. Student Edition.

    ERIC Educational Resources Information Center

    Hilley, Robert

    The instructor's guide in this package, which is one in a series of new publications developed to replace the Multistate Academic and Vocational Curriculum Consortium's previous small-engine curricula, contains the materials required to teach a competency-based course in repairing construction equipment. The guide begins with an introduction…

  10. Hospital capital funding.

    PubMed

    Hebert, M

    1992-01-01

    It is critical that hospitals have a long-range plan in place to ensure that buildings and equipment are replaced when necessary. A study undertaken in British Columbia contrasted the Greater Vancouver Regional Hospital District's capital plan (past and future) to a proposed capital replacement model. The model, developed using accepted industry standards and criteria, provided an asset value that was used for comparison purposes. Building and equipment expenditures of the Surrey Memorial Hospital were also compared against the model. Findings from both studies are presented in this article.

  11. A Statistical Analysis Of Construction Equipment Repair Costs Using Field Data & The Cumulative Cost Model.

    DTIC Science & Technology

    1998-04-28

    be discussed. 2.1 ECONOMIC REPLACEMENT THEORY Decisions about heavy equipment should be made based on sound economic principles , not emotions...Life) will be less than L*. The converse is also true. 2.1.3 The Repair Limit Theory A different way of looking at the economic replacement decision...Summary Three different economic models have been reviewed in this section. The output of each is distinct. One seeks to minimize costs, one seeks to

  12. 40 CFR Appendix A to Subpart F of... - List of Qualified Energy Conservation Measures, Qualified Renewable Generation, and Measures...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...

  13. 40 CFR Appendix A to Subpart F of... - List of Qualified Energy Conservation Measures, Qualified Renewable Generation, and Measures...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...

  14. 40 CFR Appendix A to Subpart F of... - List of Qualified Energy Conservation Measures, Qualified Renewable Generation, and Measures...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...

  15. 40 CFR Appendix A to Subpart F of... - List of Qualified Energy Conservation Measures, Qualified Renewable Generation, and Measures...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...

  16. 40 CFR Appendix A to Subpart F of... - List of Qualified Energy Conservation Measures, Qualified Renewable Generation, and Measures...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...

  17. 46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation... (7) Disposable hydrostatic release Replace on or before expiration date 28.140 (8) Undated batteries Replace 28.140 (9) Dated batteries 2 and other items Replace on or before expiration date 25.26-50, 28.140...

  18. 46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation... (7) Disposable hydrostatic release Replace on or before expiration date 28.140 (8) Undated batteries Replace 28.140 (9) Dated batteries 2 and other items Replace on or before expiration date 25.26-50, 28.140...

  19. 46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation... (7) Disposable hydrostatic release Replace on or before expiration date 28.140 (8) Undated batteries Replace 28.140 (9) Dated batteries 2 and other items Replace on or before expiration date 25.26-50, 28.140...

  20. Alternative Fuels Data Center

    Science.gov Websites

    is defined as repowering a motor vehicle or special mobile equipment by replacing its original retrofitting a motor vehicle or special mobile equipment with parts that enable its original gasoline or diesel

  1. Phaseout of Ozone-Depleting Substances

    EPA Pesticide Factsheets

    An overview of the HCFC phaseout requirements summaries of the most recent rulemakings. Provides resources for HCFC equipment owners that discuss continued use of HCFC refrigerant, and options for retrofitting or replacing specific types of equipment.

  2. KSC-01pp1802

    NASA Image and Video Library

    2001-12-01

    KENNEDY SPACE CENTER, Fla. - STS-109 Mission Specialist Richard Lennehan (left) and Payload Commander John Grunsfeld get a feel for tools and equipment that will be used on the mission. The crew is at KSC to take part in Crew Equipment Interface Test activities that include familiarization with the orbiter and equipment. The goal of the mission is to service the HST, replacing Solar Array 2 with Solar Array 3, replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002

  3. 24 CFR 3282.413 - Replacement or repurchase of manufactured home from purchaser.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... home be replaced by the manufacturer with a manufactured home substantially equal in size, equipment... to the attention of the Secretary. (c) In those situations where, under contract or other applicable...

  4. Instructional Equipment Funding in California Public Higher Education. A Report to the Legislature in Response to Supplemental Language in the 1985-86 Budget Act. Commission Report 85-38.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    Budgeting for instructional equipment at California's public colleges and universities is considered. Information is provided on how the University of California and the California State University budget the replacement of existing instructional equipment as well as instructional equipment in new or altered facilities. Methods used by the…

  5. Assessment of the National Research Universal Reactor Proposed New Stack Sampling Probe Location for Compliance with ANSI/HPS N13.1-1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glissmeyer, John A.; Antonio, Ernest J.; Flaherty, Julia E.

    2016-02-29

    This document reports on a series of tests conducted to assess the proposed air sampling location for the National Research Universal reactor (NRU) complex exhaust stack, located in Chalk River, Ontario, Canada, with respect to the applicable criteria regarding the placement of an air sampling probe. Due to the age of the equipment in the existing monitoring system, and the increasing difficulty in acquiring replacement parts to maintain this equipment, a more up-to-date system is planned to replace the current effluent monitoring system, and a new monitoring location has been proposed. The new sampling probe should be located within themore » exhaust stack according to the criteria established by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The internal Pacific Northwest National Laboratory (PNNL) project for this task was 65167, Atomic Energy Canada Ltd. Chalk River Effluent Duct Flow Qualification. The testing described in this document was guided by the Test Plan: Testing of the NRU Stack Air Sampling Position (TP-STMON-032).« less

  6. Port of Los Angeles: Off-Road Heavy Duty Equipment and Infrastructure Enhancements

    EPA Pesticide Factsheets

    Description of a project at the Port of Los Angeles to replace a diesel crane with an electric crane. Additionally includes information on shore power installation, and cargo handling equipment upgrades.

  7. Development of an approach to facilitate optimal equipment replacement.

    DOT National Transportation Integrated Search

    1999-10-01

    The principle objective of this study was to develop a procedure using available departmental data on operation, maintenance and replacement costs to provide the Louisiana Department of Transportation and Development with guidelines for the identific...

  8. KENNEDY SPACE CENTER, FLA. - Dressed in protective suits, STS-114 Mission Specialist Soichi Noguchi, with the Japanese Aerospace Exploration Agency (JAXA), handles equipment that will be used on the mission. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - Dressed in protective suits, STS-114 Mission Specialist Soichi Noguchi, with the Japanese Aerospace Exploration Agency (JAXA), handles equipment that will be used on the mission. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  9. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas (right) shows some of the mission equipment to other crew members (from left) Wendy Lawrence, mission specialist; Eileen Collins, commander; and Charles Camarda, mission specialist. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas (right) shows some of the mission equipment to other crew members (from left) Wendy Lawrence, mission specialist; Eileen Collins, commander; and Charles Camarda, mission specialist. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  10. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Andrew Thomas (left) works with equipment while Mission Specialist Soichi Noguchi watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Andrew Thomas (left) works with equipment while Mission Specialist Soichi Noguchi watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  11. Residential End Uses: Historical Efficiency Data and Incremental Installed Costs for Efficiency Upgrades

    EIA Publications

    2017-01-01

    The residential sector comprises equipment consuming various fuels and providing different end-use services. When replacing equipment, consumers may choose to purchase equipment that meets minimum federal equipment efficiency standards, or they may opt for higher-efficiency equipment, such as equipment that meets or exceeds ENERGY STAR® specifications. Consumers may also choose to purchase or retrofit different types of equipment, which may require additional costs (e.g., for ducts, exhaust vents, natural gas lines, or electrical connections) to install. The stock mix of equipment types, efficiency levels, and fuels consumed directly affects total residential sector energy consumption.

  12. 77 FR 21152 - OSRAM SYLVANIA Products Inc., Receipt of Petition for Decision of Inconsequential Noncompliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ...: OSRAM SYLVANIA Products, Inc.\\1\\ (OSRAM) has determined that certain Type HB2 replaceable light sources... merits of the petition. Equipment involved: Affected are approximately 40,544 Type HB2 replaceable light... provisions only apply to the subject Type HB2 replaceable light sources that OSRAM no longer controlled at...

  13. Energy Efficiency Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 wasmore » replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.« less

  14. Airport surface detection equipment ASDE-3 radar set : appendix I

    DOT National Transportation Integrated Search

    1973-02-01

    This specification establishes the performance, design, development, and test requirements for the Airport Surface Detection Equipment, the ASDE-3 Radar Set, intended as a replacement for the currently FAA-commissioned ASDE-2. It provides improvement...

  15. A typewriting system operated by head movements, based on home-computer equipment.

    PubMed

    Heuvelmans, A M; Mélotte, H E; Neve, J J

    1990-06-01

    For persons who cannot move their hands and legs we have designed a relatively inexpensive typewriting system which can be operated by movements of the head. The typewriter is made up of commercially available home computer equipment - i e, a computer including monitor and printer and a headset replacing the mouse. A user-friendly software program has been designed to replace the mouse button and to make this equipment act as a typewriter with simple text-editing features. Some ergonomics aspects of the typewriter set-up and the results of an evaluation of the typewriter by two patients suffering from amyotrophic lateral sclerosis (ALS) are given. Several factors relevant to the design, construction, evaluation and application of the typewriter are discussed.

  16. Solving the Money Problem in a Television Production Class

    ERIC Educational Resources Information Center

    Harris, Phillip L.

    2007-01-01

    In this article, the author chronicles his odyssey to search for an elusive prize. He was teaching a television production class that had many students and little equipment. The equipment he had was barely consumer grade. He needed to replace it with higher grade equipment as well as massively increase the quantities of everything he had so more…

  17. 76 FR 24959 - Reports, Forms, and Record Keeping Requirements; Agency Information Collection Activity Under OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... vehicles and items of replacement equipment to conduct a notification and remedy campaign (recall) when... equipment. Estimated Total Annual Burden: 150 hours. ADDRESSES: Send comments, within 30 days, to the Office...

  18. Green and economic fleet replacement modeling : part I.

    DOT National Transportation Integrated Search

    2011-10-01

    "The purpose of this study was to gain a better understanding of how equipment replacement decisions are supported with data collection and : quantitative models at state DOTs, and to determine if models found in the research literature offer any bet...

  19. A field demonstration of energy conservation using occupancy sensor lighting control in equipment rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagle, J.E.

    1992-09-01

    The Pacific Northwest Laboratory identified energy savings potential of automatic equipment-room lighting controls, which was demonstrated by the field experiment described in this report. Occupancy sensor applications have gained popularity in recent years due to improved technology that enhances reliability and reduces cost. Automatic lighting control using occupancy sensors has been accepted as an energy-conservation measure because it reduces wasted lighting. This study focused on lighting control for equipment rooms, which have inherent conditions ideal for automatic lighting control, i.e., an area which is seldom occupied, multiple users of the area who would not know if others are in themore » room when they leave, and high lighting energy intensity in the area. Two rooms were selected for this study: a small equipment room in the basement of the 337 Building, and a large equipment area in the upper level of the 329 Building. The rooms were selected to demonstrate the various degrees of complexity which may be encountered in equipment rooms throughout the Hanford Site. The 337 Building equipment-room test case demonstrated a 97% reduction in lighting energy consumption, with an annual energy savings of $184. Including lamp-replacement savings, a total savings of $306 per year is offset by an initial installation cost of $1,100. The installation demonstrates a positive net present value of $2,858 when the lamp-replacement costs are included in a life-cycle analysis. This also corresponds to a 4.0-year payback period. The 329 Building equipment-room installation resulted in a 92% reduction in lighting energy consumption. This corresponds to annual energy savings of $1,372, and a total annual savings of $2,104 per year including lamp-replacement savings. The life-cycle cost analysis shows a net present value of $15,855, with a 5.8-year payback period.« less

  20. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Stephen Frick and STS-114 Mission Specialist Wendy Lawrence watch as crew members work with equipment that will be used on the mission. Frick is a tile specialist, who joined the STS-114 crew during equipment familiarization at KSC. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Stephen Frick and STS-114 Mission Specialist Wendy Lawrence watch as crew members work with equipment that will be used on the mission. Frick is a tile specialist, who joined the STS-114 crew during equipment familiarization at KSC. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  1. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialists Andrew Thomas (center) and Soichi Noguchi (right) work with equipment while Mission Specialist Charles Camarda (left) watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialists Andrew Thomas (center) and Soichi Noguchi (right) work with equipment while Mission Specialist Charles Camarda (left) watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  2. KENNEDY SPACE CENTER, FLA. - Dressed in protective suits, STS-114 Mission Specialist Andrew Thomas (left) and Soichi Noguchi, who is with the Japanese Aerospace Exploration Agency (JAXA), handle equipment in the Space Station Processing Facility that will be used on the mission. They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - Dressed in protective suits, STS-114 Mission Specialist Andrew Thomas (left) and Soichi Noguchi, who is with the Japanese Aerospace Exploration Agency (JAXA), handle equipment in the Space Station Processing Facility that will be used on the mission. They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  3. KSC-08pd2084

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier, for the Hubble Space Telescope is unwrapped and awaits final processing for launch. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. MOOSE: Manned On-Orbit Servicing Equipment

    NASA Technical Reports Server (NTRS)

    Budinoff, J. (Editor); Leontsinis, N. (Editor); Lane, J. (Editor); Singh, R. (Editor); Angelone, K.; Boswell, C.; Chamberlain, I.; Concha, M.; Corrodo, M.; Custodio, O.

    1993-01-01

    The ability to service satellites has thus far been limited to low earth orbit platforms within reach of the Space Shuttle. Other orbits, such as geosynchronous orbits containing high-value spacecraft have not been attainable by a servicing vehicle. The useful life of a satellite can be extended by replacing spent propellant and damaged orbital replacement units, forestalling the need for eventual replacement. This growing need for satellite on-orbits servicing can be met by the Manned On-Orbit Servicing Equipment (MOOSE). Missions requiring orbit transfer capability, precision manipulation and maneuvering, and man-in-the-loop control can be accomplished using MOOSE. MOOSE is a flexible, reusable, single operator, aerobraking spacecraft designed to refuel, repair, and service orbiting spacecraft. MOOSE will be deployed from Space Station Freedom, (SSF), where it will be stored, resupplied, and refurbished.

  5. 30 CFR 57.4203 - Extinguisher recharging or replacement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 57.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Firefighting Equipment § 57.4203 Extinguisher recharging or replacement. Fire...

  6. 30 CFR 56.4203 - Extinguisher recharging or replacement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 56.4203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Firefighting Equipment § 56.4203 Extinguisher recharging or replacement. Fire...

  7. Supporting management of medical equipment for inpatient service in public hospitals: a case study.

    PubMed

    Figueroa, Rosa L; Vallejos, Guido E

    2013-01-01

    This work presents a study of medical equipment availability in the short and long term. The work is divided in two parts. The first part is an analysis of the medical equipment inventory for the institution of study. We consider the replacement, maintenance, and reinforcement of the available medical equipment by considering local guidelines and surveying clinical personnel appreciation. The resulting recommendation is to upgrade the current equipment inventory if necessary. The second part considered a demand analysis in the short and medium term. We predicted the future demand with a 5-year horizon using Holt-Winters models. Inventory analysis showed that 27% of the medical equipment in stock was not functional. Due to this poor performance result we suggested that the hospital gradually addresses this situation by replacing 29 non-functional equipment items, reinforcing stock with 40 new items, and adding 11 items not available in the inventory but suggested by the national guidelines. The results suggest that general medicine inpatient demand has a tendency to increase within the time e.g. for general medicine inpatient service the highest increment is obtained by respiratory (12%, RMSE=8%) and genitourinary diseases (20%, RMSE=9%). This increment did not involve any further upgrading of the proposed inventory.

  8. KENNEDY SPACE CENTER, FLA. - At the KSC Launch Pad 39A, two members of the payload closeout crew check equipment as the doors are just about ready to be closed. The Payload inside the bay of Discovery, the orbiter for the STS-82 mission, is ready for the launch of the second Hubble Space Telescope service mission. The payload consists of the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) that will be installed, Fine Guidance Sensor #1 (FGS-1), and the Space Telescope Imaging Spectrograph (STIS) to be installed. The STS-82 will launch with a crew of seven at 3:54 a.m. EST, Feb. 11, 1997. The launch window is 65 minutes in duration. The Mission Commander for STS-82 is Ken Bowersox. The purpose of the mission is to upgrade the scientific capabilities, service or replace aging components on the Telescope and provide a reboost to the optimum altitude.

    NASA Image and Video Library

    1997-02-07

    KENNEDY SPACE CENTER, FLA. - At the KSC Launch Pad 39A, two members of the payload closeout crew check equipment as the doors are just about ready to be closed. The Payload inside the bay of Discovery, the orbiter for the STS-82 mission, is ready for the launch of the second Hubble Space Telescope service mission. The payload consists of the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) that will be installed, Fine Guidance Sensor #1 (FGS-1), and the Space Telescope Imaging Spectrograph (STIS) to be installed. The STS-82 will launch with a crew of seven at 3:54 a.m. EST, Feb. 11, 1997. The launch window is 65 minutes in duration. The Mission Commander for STS-82 is Ken Bowersox. The purpose of the mission is to upgrade the scientific capabilities, service or replace aging components on the Telescope and provide a reboost to the optimum altitude.

  9. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and.../path survey); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning... defined as the actual costs associated with providing a replacement system, such as equipment and...

  10. The Search for Nonflammable Solvent Alternatives for Cleaning Aerospace Oxygen Systems

    NASA Technical Reports Server (NTRS)

    Mitchell, Mark A.; Lowrey, Nikki

    2012-01-01

    To obtain a high degree of cleanliness without risk of corrosion or hazardous reactivity, hydrochlorofluorocarbon (HCFC)-225 is used for cleaning and cleanliness verification of oxygen system components used on NASA fs bipropellant launch vehicles, associated test stands and support equipment. HCFC-225 is a Class II Ozone Depleting Substance (ODS ]II) that was introduced to replace chlorofluorocarbon (CFC)-113, a Class I ODS solvent that is now banned. To meet environmental regulations to eliminate the use of ozone depleting substances, a replacement solvent is required for HCFC ]225 that is effective at removing oils, greases, and particulate from large oxygen system components, is compatible with materials used in the construction of these systems, and is nonflammable and non ]reactive in enriched oxygen environments. A solvent replacement is also required for aviator fs breathing oxygen systems and other related equipment currently cleaned and verified with HCFC ]225 and stockpiled CFC -113. Requirements and challenges in the search for nonflammable replacement solvents are discussed.

  11. 7 CFR 3015.170 - Damage, loss, or theft of equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and (ii) The damage, loss, or theft is not due to an act of God. (2) Equipment replaced. If the... § 3015.169(c) or (ii) The damage, loss, or theft is due to an act of God. (2) Recipient not compensated...

  12. 24 CFR 570.202 - Eligible rehabilitation and preservation activities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...

  13. 24 CFR 570.202 - Eligible rehabilitation and preservation activities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...

  14. 24 CFR 570.202 - Eligible rehabilitation and preservation activities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...

  15. 24 CFR 570.202 - Eligible rehabilitation and preservation activities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... replacement of heating and cooling equipment, including the use of solar energy equipment; (5) Improvements to... objectives; (4) Improvements to increase the efficient use of energy in structures through such means as... counseling, energy auditing, preparation of work specifications, loan processing, inspections, and other...

  16. 40 CFR 49.144 - Control equipment requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... remote notification system if the pilot flame fails. (B) An electronically controlled auto-ignition... emissions; (iv) The pit flare is equipped with an electronically controlled auto-ignition system with a... electronically controlled auto-ignition system must be repaired or replaced before the pit flare is utilized...

  17. 40 CFR 49.144 - Control equipment requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... remote notification system if the pilot flame fails. (B) An electronically controlled auto-ignition... emissions; (iv) The pit flare is equipped with an electronically controlled auto-ignition system with a... electronically controlled auto-ignition system must be repaired or replaced before the pit flare is utilized...

  18. 15 CFR 740.10 - License Exception Servicing and replacement of parts and equipment (RPL).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... repaired is an “aircraft” (as defined in § 772.1 of the EAR) or is controlled for national security (NS... detection equipment classified under ECCN 2A983 or related software classified under ECCN 2D983. (vi) No... equipment classified under ECCN 2A984 or related software classified under ECCN 2D984. (vii) The conditions...

  19. Running Out of Steam.

    ERIC Educational Resources Information Center

    Kumar, Promod

    2000-01-01

    Explains why schools should evaluate whether their older steam-heating systems are still cost-effective, or need to be repaired or replaced. The symptoms of deterioration are listed along with discussions on repair or replacement decision making on three areas of steam heating systems: boilers; distribution system; and terminal equipment. (GR)

  20. 40 CFR 86.1806-01 - On-board diagnostics.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-board diagnostic system during the certification process, that functions properly on low-sulfur gasoline... equipped. (1) A catalyst is replaced with a deteriorated or defective catalyst, or an electronic simulation... oxygen sensor is replaced with a deteriorated or defective oxygen sensor, or an electronic simulation of...

  1. KSC-08pd2077

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  2. KSC-08pd2081

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  3. KSC-08pd2075

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to remove the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. KSC-08pd2074

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is secured on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  5. KSC-08pd2076

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  6. KSC-08pd2070

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  7. KSC-08pd2073

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is positioned on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  8. KSC-08pd2080

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  9. KSC-08pd2078

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  10. KSC-08pd2079

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  11. Starting System 1. Check and Replace the Starter Rewind Rope. Student Manual. Small Engine Repair Series. First Edition.

    ERIC Educational Resources Information Center

    Hill, Pamela

    This student manual on checking and replacing the starter rewind rope is the second of three in an instructional package on the starting system in the Small Engine Repair Series for handicapped students. The stated purpose for the booklet is to help students learn what tools and equipment to use in checking and replacing the starter rewind rope…

  12. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Lee Archambault and STS-114 Mission Specialist Charles Camarda watch as crew members work with equipment that will be used on the mission. Archambault supports launch and landing operations at the Kennedy Space Center as an Astronaut Office representative. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

    NASA Image and Video Library

    2004-01-27

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Lee Archambault and STS-114 Mission Specialist Charles Camarda watch as crew members work with equipment that will be used on the mission. Archambault supports launch and landing operations at the Kennedy Space Center as an Astronaut Office representative. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.

  13. 46 CFR 169.553 - Pyrotechnic distress signals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pyrotechnic distress signals. 169.553 Section 169.553... Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.553 Pyrotechnic distress signals. (a) All pyrotechnic distress signals must be of an approved type. (b) Replacement must be made no...

  14. 46 CFR 169.553 - Pyrotechnic distress signals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Pyrotechnic distress signals. 169.553 Section 169.553... Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.553 Pyrotechnic distress signals. (a) All pyrotechnic distress signals must be of an approved type. (b) Replacement must be made no...

  15. 78 FR 79599 - Airworthiness Directives; Various Aircraft Equipped With Wing Lift Struts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... Airworthiness Directives; Various Aircraft Equipped With Wing Lift Struts AGENCY: Federal Aviation... wing lift struts. The list of affected airplanes in the Applicability section is incorrect. Several... wing lift struts for corrosion; repetitively inspecting the wing lift strut forks for cracks; replacing...

  16. 46 CFR 169.553 - Pyrotechnic distress signals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Pyrotechnic distress signals. 169.553 Section 169.553... Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.553 Pyrotechnic distress signals. (a) All pyrotechnic distress signals must be of an approved type. (b) Replacement must be made no...

  17. 46 CFR 169.553 - Pyrotechnic distress signals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Pyrotechnic distress signals. 169.553 Section 169.553... Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.553 Pyrotechnic distress signals. (a) All pyrotechnic distress signals must be of an approved type. (b) Replacement must be made no...

  18. 46 CFR 169.553 - Pyrotechnic distress signals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Pyrotechnic distress signals. 169.553 Section 169.553... Lifesaving and Firefighting Equipment Additional Lifesaving Equipment § 169.553 Pyrotechnic distress signals. (a) All pyrotechnic distress signals must be of an approved type. (b) Replacement must be made no...

  19. Analyzing Investments in Thin-Kerf Saws

    Treesearch

    Philip H. Steele; Philip A. Araman

    1996-01-01

    The rising cost of hardwood sawlogs has increasd sawmill managers' interest in considering the installation of thin-kerf sawing machines in their sawmills. Replacement of circular headrigs by band headrigs and/or reducing resaw kerfs are the available options. Equipment replacement or modification to achieve thin-kerf sawing will require an investment. Sawmill...

  20. 77 FR 23478 - Agency Information Collection Activities; Proposed Collection; Comment Request; Reporting and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... (catalysts) not equivalent to new original equipment (OE) catalysts would constitute a violation of the Act. However, because replacement OE catalysts are expensive, many consumers had elected to not replace catalysts that malfunctioned subsequent to the expiration of the emissions warranty on their vehicles. The...

  1. Stockpile Model of Personal Protective Equipment in Taiwan.

    PubMed

    Chen, Yu-Ju; Chiang, Po-Jung; Cheng, Yu-Hsin; Huang, Chun-Wei; Kao, Hui-Yun; Chang, Chih-Kai; Huang, Hsun-Miao; Liu, Pei-Yin; Wang, Jen-Hsin; Chih, Yi-Chien; Chou, Shu-Mei; Yang, Chin-Hui; Chen, Chang-Hsun

    The Taiwan Centers for Disease Control (Taiwan CDC) has established a 3-tier personal protective equipment (PPE) stockpiling framework that could maintain a minimum stockpile for the surge demand of PPE in the early stage of a pandemic. However, PPE stockpiling efforts must contend with increasing storage fees and expiration problems. In 2011, the Taiwan CDC initiated a stockpile replacement model in order to optimize the PPE stockpiling efficiency, ensure a minimum stockpile, use the government's limited funds more effectively, and achieve the goal of sustainable management. This stockpile replacement model employs a first-in-first-out principle in which the oldest stock in the central government stockpile is regularly replaced and replenished with the same amount of new and qualified products, ensuring the availability and maintenance of the minimum stockpiles. In addition, a joint electronic procurement platform has been established for merchandising the replaced PPE to local health authorities and medical and other institutions for their routine or epidemic use. In this article, we describe the PPE stockpile model in Taiwan, including the 3-tier stockpiling framework, the operational model, the components of the replacement system, implementation outcomes, epidemic supports, and the challenges and prospects of this model.

  2. Stockpile Model of Personal Protective Equipment in Taiwan

    PubMed Central

    Chen, Yu-Ju; Cheng, Yu-Hsin; Huang, Chun-Wei; Kao, Hui-Yun; Chang, Chih-Kai; Huang, Hsun-Miao; Liu, Pei-Yin; Wang, Jen-Hsin; Chih, Yi-Chien; Chou, Shu-Mei; Yang, Chin-Hui; Chen, Chang-Hsun

    2017-01-01

    The Taiwan Centers for Disease Control (Taiwan CDC) has established a 3-tier personal protective equipment (PPE) stockpiling framework that could maintain a minimum stockpile for the surge demand of PPE in the early stage of a pandemic. However, PPE stockpiling efforts must contend with increasing storage fees and expiration problems. In 2011, the Taiwan CDC initiated a stockpile replacement model in order to optimize the PPE stockpiling efficiency, ensure a minimum stockpile, use the government's limited funds more effectively, and achieve the goal of sustainable management. This stockpile replacement model employs a first-in-first-out principle in which the oldest stock in the central government stockpile is regularly replaced and replenished with the same amount of new and qualified products, ensuring the availability and maintenance of the minimum stockpiles. In addition, a joint electronic procurement platform has been established for merchandising the replaced PPE to local health authorities and medical and other institutions for their routine or epidemic use. In this article, we describe the PPE stockpile model in Taiwan, including the 3-tier stockpiling framework, the operational model, the components of the replacement system, implementation outcomes, epidemic supports, and the challenges and prospects of this model. PMID:28418743

  3. Medical technology management: from planning to application.

    PubMed

    David, Y; Jahnke, E

    2005-01-01

    Appropriate deployment of technological innovation contributes to improvement in the quality of healthcare delivered, the containment of cost, and access to the healthcare system. Hospitals have been allocating a significant portion of their resources to procuring and managing capital assets; they are continuously faced with demands for new medical equipment and are asked to manage existing inventory for which they are not well prepared. To objectively manage their investment, hospitals are developing medical technology management programs that need pertinent information and planning methodology for integrating new equipment into existing operations as well as for optimizing costs of ownership of all equipment. Clinical engineers can identify technological solutions based on the matching of new medical equipment with hospital's objectives. They can review their institution's overall technological position, determine strengths and weaknesses, develop equipment-selection criteria, supervise installations, train users and monitor post procurement performance to assure meeting of goals. This program, together with cost accounting analysis, will objectively guide the capital assets decision-making process. Cost accounting analysis is a multivariate function that includes determining the amount, based upon a strategic plan and financial resources, of funding to be allocated annually for medical equipment acquisition and replacement. Often this function works closely with clinical engineering to establish equipment useful life and prioritization of acquisition, upgrade, and replacement of inventory within budget confines and without conducting time consuming, individual financial capital project evaluations.

  4. Renewal of radiological equipment.

    PubMed

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a minimum of 5 years, with annual updating.

  5. The Impact of a Library Flood on Computer Operations.

    ERIC Educational Resources Information Center

    Myles, Barbara

    2000-01-01

    Describes the efforts at Boston Public Library to recover from serious flooding that damaged computer equipment. Discusses vendor help in assessing the damage; the loss of installation disks; hiring consultants to help with financial matters; effects on staff; repairing and replacing damaged equipment; insurance issues; and disaster recovery…

  6. Forecasting Fuels Support Equipment Requisitions

    DTIC Science & Technology

    2015-03-26

    Blackstone , & Hoffmann, 1991). Problem Statement Which forecasting method is most appropriate to forecast fuels support equipment requisitions...over allocating financial resources. 14 Characteristics According to Fogarty, Blackstone , and Hoffman (1991), service, repair, replacement...Econometrica , 187-222. Fogarty, D., Blackstone , J., & Hoffmann, T. (1991). Production & Inventory Management (2d ed.). Cincinnati, OH: South-Western

  7. 7 CFR 58.128 - Equipment and utensils.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... hours shall be equipped with adequate refrigeration and/or have adequate insulation. New or replacement... accurate within 1 °F., plus or minus, for the applicable temperature range, shall be used on each heat... connections shall be leak proof. (j) Plate type heat exchangers. Plate type heat exchanger shall comply with...

  8. 7 CFR 58.128 - Equipment and utensils.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... hours shall be equipped with adequate refrigeration and/or have adequate insulation. New or replacement... accurate within 1 °F., plus or minus, for the applicable temperature range, shall be used on each heat... connections shall be leak proof. (j) Plate type heat exchangers. Plate type heat exchanger shall comply with...

  9. 7 CFR 58.128 - Equipment and utensils.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... hours shall be equipped with adequate refrigeration and/or have adequate insulation. New or replacement... accurate within 1 °F., plus or minus, for the applicable temperature range, shall be used on each heat... connections shall be leak proof. (j) Plate type heat exchangers. Plate type heat exchanger shall comply with...

  10. Readily implementable techniques can cut annual CO2 emissions from the production of concrete by over 20%

    NASA Astrophysics Data System (ADS)

    Miller, Sabbie A.; Horvath, Arpad; Monteiro, Paulo J. M.

    2016-07-01

    Due to its prevalence in modern infrastructure, concrete is experiencing the most rapid increase in consumption among globally common structural materials; however, the production of concrete results in approximately 8.6% of all anthropogenic CO2 emissions. Many methods have been developed to reduce the greenhouse gas emissions associated with the production of concrete. These methods range from the replacement of inefficient manufacturing equipment to alternative binders and the use of breakthrough technologies; nevertheless, many of these methods have barriers to implementation. In this research, we examine the extent to which the increased use of several currently implemented methods can reduce the greenhouse gas emissions in concrete material production without requiring new technologies, changes in production, or novel material use. This research shows that, through increased use of common supplementary cementitious materials, appropriate selection of proportions for cement replacement, and increased concrete design age, 24% of greenhouse gas emissions from global concrete production or 650 million tonnes (Mt) CO2-eq can be eliminated annually.

  11. KSC-08pd2071

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, at ground-level left, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  12. KSC-08pd2072

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, seen behind the ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  13. 77 FR 71697 - Safety Zone; Overhead Cable Replacement, Maumee River, Toledo, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... that may lead to the discovery of a significant environmental impact from this rule. List of Subjects..., Toledo, OH (docket number USCG-2012-0948) in support of the replacement of electrical cables suspended... an equipment failure, an unforeseen breakage of one of the electrical cables and inclement weather...

  14. 77 FR 38375 - Advisory Circular (AC) 150/5345-53D, Airport Lighting Equipment Certification Program; Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ...The FAA proposes to replace AC150/5345-53C with AC150/5345-53D to clarify the criteria under the Airport Lighting Equipment Certification Program (ALECP) for acceptance of an organization as a third party certification body (third party certifier) and how manufacturers may get equipment qualified under the program. The Secretary of Transportation is providing notice in the Federal Register of, and an opportunity for public comment on AC150/5345-53D, Airport Lighting Equipment Certification Program.

  15. 40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 20 2013-07-01 2013-07-01 false Aging Bench Equipment and Procedures.... 86, App. VIII Appendix VIII to Part 86—Aging Bench Equipment and Procedures This appendix provides specifications for standard aging bench equipment and aging procedures which may be used to conduct bench aging...

  16. 40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Aging Bench Equipment and Procedures.... VIII Appendix VIII to Part 86—Aging Bench Equipment and Procedures This appendix provides specifications for standard aging bench equipment and aging procedures which may be used to conduct bench aging...

  17. 40 CFR Appendix Viii to Part 86 - Aging Bench Equipment and Procedures

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 20 2012-07-01 2012-07-01 false Aging Bench Equipment and Procedures.... 86, App. VIII Appendix VIII to Part 86—Aging Bench Equipment and Procedures This appendix provides specifications for standard aging bench equipment and aging procedures which may be used to conduct bench aging...

  18. The CFC challenge: chillers to replace, retrofit or ?

    PubMed

    Anderson, W D

    1995-01-01

    Health care facilities are planning for changes in regulations regarding chlorofluorocarbon-based refrigerants. These changes are imminent, leaving little time to figure out what to do with equipment using these refrigerants. This article looks at the background of the CFC phaseout program and reviews options available to engineers in assessing their equipment.

  19. Automation and Engineering Psychology: A Look to the Future.

    ERIC Educational Resources Information Center

    Parsons, H. McIlvaine

    Various aspects of automation are explained to differentiate it from technology and mechanization and to show the difference between using equipment to help humans and using equipment to replace humans. Five reasons are given for engineering psychology to focus its attention on automation. Automation issues in a number of areas are discussed,…

  20. Zirconium Recycle Test Equipment for Hot Cell Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collins, Emory D.; DelCul, Guillermo Daniel; Spencer, Barry B.

    2015-01-30

    The equipment components and assembly support work were modified for optimized, remote hot cell operations to complete this milestone. The modifications include installation of a charging door, Swagelok connector for the off-gas line between the reactor and condenser, and slide valve installation to permit attachment/replacement of the product salt collector bottle.

  1. 48 CFR 22.1003-6 - Repair distinguished from remanufacturing of equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... overhauled are restored to original life expectancy, or nearly so. (vii) Such work is performed in a facility... replaced. (iii) The item or equipment is rebuilt or reassembled. (iv) The contract work results in the furnishing of a substantially modified item in a usable and serviceable condition. (v) The work is performed...

  2. Research on Application of FMECA in Missile Equipment Maintenance Decision

    NASA Astrophysics Data System (ADS)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  3. Disposable blast shields for use on NIF imaging diagnostics

    NASA Astrophysics Data System (ADS)

    Smith, Cal A.; Wang, Karen M.; Masters, Nathan

    2015-08-01

    The NIFs 192 lasers can deliver 2 MJ of energy to Target Chamber Center (TCC) to produce environments not available in any other experimental laboratory. The NIFs ability to deliver such intense energy to a small volume causes harsh consequences to experimental equipment and supporting diagnostics such as holhraums, support packages, target positioners, diagnostic equipment, and laser optics. Of these, the hohlraum and support packages are typically quickly vaporized and transformed into an expanding shell of high-hypersonic gases referred to as debris wind. During an experimental event such as fusion implosion, the target diagnostic components used to measure key observables in the experiment are subjected to extreme pressures and impact shocks due to incident debris wind loading. As diagnostics are positioned closer to TCC, the diagnostic pinhole stacks and other components along the diagnostic structure become more likely to be at or above the yield strength of the materials commonly used. In particular, the pinhole stack components and data recording instruments behind the pinholes are the most costly to replace. Thus, a conceptual configuration for a pinhole shield is proposed, analyzed, and tested with the intent of mitigating damage to the pinhole stack and imaging equipment and allowing immediate re-use of this diagnostic equipment. This pinhole shield would be a replaceable window that can be replaced quickly by inserting and removing it before and after each experimental laser shot, which will allow NIF to benefit from significant material and labor costs.

  4. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manuallymore » or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.« less

  5. KSC-08pd2100

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. --CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, three carriers are undergoing processing for space shuttle Atlantis' STS-125 mission to service the Hubble Space Telescope. From left are the Flight Support System or FSS, the Orbital Replacement Unit Carrier or ORUC, and the Super Lightweight Interchangeable Carrier or SLIC. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  6. KSC-08pd2099

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, this elevated view shows three carriers undergoing processing for space shuttle Atlantis' STS-125 mission to service the Hubble Space Telescope. From left are the Flight Support System or FSS, the Orbital Replacement Unit Carrier or ORUC, and the Super Lightweight Interchangeable Carrier or SLIC. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  7. 46 CFR 35.01-55 - Pilot boarding operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding operation. 35.01-55 Section 35.01-55... Requirements § 35.01-55 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is... or spreader step on a pilot ladder must be replaced in kind with an approved replacement step or...

  8. 46 CFR 35.01-55 - Pilot boarding operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Pilot boarding operation. 35.01-55 Section 35.01-55... Requirements § 35.01-55 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is... or spreader step on a pilot ladder must be replaced in kind with an approved replacement step or...

  9. Occupational exposure to polybrominated diphenyl ethers (PBDEs) and other flame retardant foam additives at gymnastics studios: Before, during and after the replacement of pit foam with PBDE-free foams.

    PubMed

    Ceballos, Diana M; Broadwater, Kendra; Page, Elena; Croteau, Gerry; La Guardia, Mark J

    2018-07-01

    Coaches spend long hours training gymnasts of all ages aided by polyurethane foam used in loose blocks, mats, and other padded equipment. Polyurethane foam can contain flame retardant additives such as polybrominated diphenyl ethers (PBDEs), to delay the spread of fires. However, flame retardants have been associated with endocrine disruption and carcinogenicity. The National Institute for Occupational Safety and Health (NIOSH) evaluated employee exposure to flame retardants in four gymnastics studios utilized by recreational and competitive gymnasts. We evaluated flame retardant exposure at the gymnastics studios before, during, and after the replacement of foam blocks used in safety pits with foam blocks certified not to contain several flame retardants, including PBDEs. We collected hand wipes on coaches to measure levels of flame retardants on skin before and after their work shift. We measured flame retardant levels in the dust on window glass in the gymnastics areas and office areas, and in the old and new foam blocks used throughout the gymnastics studios. We found statistically higher levels of 9 out of 13 flame retardants on employees' hands after work than before, and this difference was reduced after the foam replacement. Windows in the gymnastics areas had higher levels of 3 of the 13 flame retardants than windows outside the gymnastics areas, suggesting that dust and vapor containing flame retardants became airborne. Mats and other padded equipment contained levels of bromine consistent with the amount of brominated flame retardants in foam samples analyzed in the laboratory. New blocks did not contain PBDEs, but did contain the flame retardants 2-ethylhexyl 2,3,4,5-tetrabromobenzoate and 2-ethylhexyl 2,3,4,5-tetrabromophthalate. We conclude that replacing the pit foam blocks eliminated a source of PBDEs, but not 2-ethylhexyl 2,3,4,5-tetrabromobenzoate and 2-ethylhexyl 2,3,4,5-tetrabromophthalate. We recommend ways to further minimize employee exposure to flame retardants at work and acknowledge the challenges consumers have identifying chemical contents of new products. Published by Elsevier Ltd.

  10. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... supporting acts of international terrorism) if the commodity to be repaired is an “aircraft” (as defined in... equipment controlled under ECCN 2A983 or related software controlled under ECCN 2D983. (vi) The conditions... defective or unacceptable U.S.-origin commodities and software. (2) Commodities and software sent to a...

  11. 40 CFR 60.480 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart. (c) Addition or replacement of equipment for the purpose of process improvement which is... all equipment (defined in § 60.481) within a process unit is an affected facility. (b) Any affected... the definition of “process unit” in § 60.481 and the requirements in § 60.482-1(g) of this subpart...

  12. Laboratory equipment maintenance: a critical bottleneck for strengthening health systems in sub-Saharan Africa?

    PubMed

    Fonjungo, Peter N; Kebede, Yenew; Messele, Tsehaynesh; Ayana, Gonfa; Tibesso, Gudeta; Abebe, Almaz; Nkengasong, John N; Kenyon, Thomas

    2012-02-01

    Properly functioning laboratory equipment is a critical component for strengthening health systems in developing countries. The laboratory can be an entry point to improve population health and care of individuals for targeted diseases - prevention, care, and treatment of TB, HIV/AIDS, and malaria, plus maternal and neonatal health - as well as those lacking specific attention and funding. We review the benefits and persistent challenges associated with sustaining laboratory equipment maintenance. We propose equipment management policies as well as a comprehensive equipment maintenance strategy that would involve equipment manufacturers and strengthen local capacity through pre-service training of biomedical engineers. Strong country leadership and commitment are needed to assure development and sustained implementation of policies and strategies for standardization of equipment, and regulation of its procurement, donation, disposal, and replacement.

  13. Guidelines for Electromagnetic Interference Testing of Power Plant Equipment: Revision 3 to TR-102323

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Cunningham and J. Shank

    2004-11-01

    To continue meeting safety and reliability requirements while controlling costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. One issue that has been problematic for new plant equipment and especially for digital instrumentation and control (I&C) systems in recent years is electromagnetic compatibility (EMC). The EMC issue usually involves testing to show that critical equipment will not be adversely affected by electromagnetic interference (EMI) in the plant environment. This guide will help nuclear plant engineers address EMC issues and qualification testing in a consistent, comprehensive manner.

  14. Selecting the right ultrasound equipment--an administrator's perspective.

    PubMed

    Jacoby, Robert

    2003-01-01

    Recent advancements in ultrasound equipment, technology and capability make the selection of new or replacement equipment a difficult task. It is not uncommon that the sonographers will have different needs and wants from the equipment than do the radiologists. This potential hurdle needs to be addressed in order to arrive at a mutually acceptable selection. Vendors across the board all have very competitive products and they each have that special little "function" or "enhancement" that sets them apart from their competitor. The customer needs to approach the evaluation of the equipment in a very objective manner in order to truly understand not only the differences of each piece of equipment but the actual capability of each piece of equipment. In the end however, it is the individual sonographer that will be utilizing the equipment most of the time and they should have the final say to department management as to which equipment is selected.

  15. ASC Addresses Unit Commanders’ Concerns through LBE and Reset Programs

    DTIC Science & Technology

    2008-09-01

    Distribution Management Center (DMC). The DMC, based at ASC Headquarters on Rock Island Arsenal, Ilinois, has become the single ASC integrator for LBE and field-level reset in support of ARFORGEN. The reset of units returning from OEF/OIF consists of a series of actions to restore the units to a desired level of combat capability commensurate with future mission requirements. These actions include the repair of equipment, replacement of equipment lost during operations, and recapitalization of equipment where feasible and

  16. New Generation General Purpose Computer (GPC) compact IBM unit

    NASA Technical Reports Server (NTRS)

    1991-01-01

    New Generation General Purpose Computer (GPC) compact IBM unit replaces a two-unit earlier generation computer. The new IBM unit is documented in table top views alone (S91-26867, S91-26868), with the onboard equipment it supports including the flight deck CRT screen and keypad (S91-26866), and next to the two earlier versions it replaces (S91-26869).

  17. Learner-Centered Instruction (LCI): Volume IV, The Simulated Maintenance Task Environment (SMTE): A Job Specific Simulator.

    ERIC Educational Resources Information Center

    Rifkin, Kenneth I.; And Others

    The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…

  18. 40 CFR 261.35 - Deletion of certain hazardous waste codes following equipment cleaning and replacement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cleaning and replacement. (a) Wastes from wood preserving processes at plants that do not resume or... parts per trillion (ppt), sample weight of 1000 g, IS spiking level of 1 ppt, final extraction volume of... previously used and the date on which their use ceased in each process at the plant; (3) Formulations...

  19. 40 CFR 261.35 - Deletion of certain hazardous waste codes following equipment cleaning and replacement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... cleaning and replacement. (a) Wastes from wood preserving processes at plants that do not resume or... parts per trillion (ppt), sample weight of 1000 g, IS spiking level of 1 ppt, final extraction volume of... previously used and the date on which their use ceased in each process at the plant; (3) Formulations...

  20. The Recovery of a Clinical Database Management System after Destruction by Fire *

    PubMed Central

    Covvey, H.D.; McAlister, N.H.; Greene, J.; Wigle, E.D.

    1981-01-01

    In August 1980 a fire in the Cardiovascular Unit at Toronto General Hospital severely damaged the physical plant and rendered all on-site equipment unrecoverable. Among the hardware items in the fire was the computer which supports our cardiovascular database system. Within hours after the fire it was determined that the computer was no longer serviceable. Beyond off-site back-up tapes, there was the possibility that recent records on the computer had suffered a similar fate. Immediate procedures were instituted to obtain a replacement computer system and to clean media to permit data recovery. Within 2 months a partial system was supporting all users, and all data was recovered and being used. The destructive potential of a fire is rarely seriously considered relative to computer equipment in our clinical environments. Full-replacement value insurance; an excellent equipment supplier with the capacity to respond to an emergency; backup and recovery procedures with off-site storage; and dedicated staff are key hedges against disaster.

  1. Assessment of Eco-friendly Gases for Electrical Insulation to Replace the Most Potent Industrial Greenhouse Gas SF6.

    PubMed

    Rabie, Mohamed; Franck, Christian M

    2018-01-16

    Gases for electrical insulation are essential for the operation of electric power equipment. This Review gives a brief history of gaseous insulation that involved the emergence of the most potent industrial greenhouse gas known today, namely sulfur hexafluoride. SF 6 paved the way to space-saving equipment for the transmission and distribution of electrical energy. Its ever-rising usage in the electrical grid also played a decisive role in the continuous increase of atmospheric SF 6 abundance over the last decades. This Review broadly covers the environmental concerns related to SF 6 emissions and assesses the latest generation of eco-friendly replacement gases. They offer great potential for reducing greenhouse gas emissions from electrical equipment but at the same time involve technical trade-offs. The rumors of one or the other being superior seem premature, in particular because of the lack of dielectric, environmental, and chemical information for these relatively novel compounds and their dissociation products during operation.

  2. GPS System Specification for Shipboard TACAN Replacement.

    DTIC Science & Technology

    1991-11-08

    BE 0.4 uS 2II2I S FOR JTIDS INTEROPERAMILITY, OR 32 IaS FOR UNK4 OR LeAND LPiIAJ DATA LNK 64 AS MINIMUM SPACING Figure 3. Evolution of JTIDS Signal...the manufacturer of the equipment to prove that, if they receive the correct signal and the correct data, the equipment processes it properly to avoid

  3. 77 FR 50114 - Food and Drug Administration Modernization Act of 1997: Modifications to the List of Recognized...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... edition 2011- Withdrawn and replaced 09-01 Infusion equipment for with newer version. medical use--Part 1: Infusion glass bottles. 6-175 ASTM D5151-06 (Reapproved Reaffirmation. 2011) Standard Test Method for... single use. 6-242 ISO 8536-2 Third edition 2010- Contact person. 03-15, Infusion equipment for medical...

  4. 76 FR 67346 - Airworthiness Directives; Cessna Aircraft Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... one of the affected airplanes equipped with a lithium-ion battery as the main aircraft battery. We are... replacing the lithium-ion main aircraft battery, Cessna part number (P/N) 9914788-1, with a Ni-Cad or a lead... power unit was connected to a Cessna Model 525C airplane equipped with a lithium-ion battery, Cessna P/N...

  5. Carbon monoxide and nitrogen dioxide levels in an indoor ice skating rink with mitigation methods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, K.; Yanagisawa, Y.; Spengler, J.D.

    1993-05-01

    An indoor ice skating rink is an enclosed space with intermittent air pollutant emissions from fuel-powered ice-resurfacing equipment, such as a resurfacer and an edger. Exhaust gases discharged from the resurfacing equipment actually include significant quantities of carbon monoxide (CO) and nitrogen dioxide (NO[sub 2]) which may induced adverse health effects. Carbon monoxide exposures in ice skating rinks resulting from malfunctioning ice resurfacing equipment were first reported more than twenty years ago. Attempts to reduce emissions of CO and NO[sub 2] form resurfacing equipment, such as the extended exhaust pipe, operation of the air recirculation system or reduced resurfacer operation,more » appeared not to be effective for maintaining the air pollutant concentrations below guidelines. Even though improved indoor air quality was obtained by the combination of the full operation of the air exhaust system and the reduced number of resurfacer operations in this investigation, these methods may be impractical for most skating rinks. Replacement of the fuel-powered resurfacer with a battery operated resurfacer is recommended. If replacement is not feasible, then increasing the air ventilation rate is recommended as a second choice. 10 refs., 1 fig., 1 tab.« less

  6. Satellite Power Systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    The economic and programmatic requirements for a recommended SPS solar photovoltaic baseline concept were analyzed. Costs are determined for the DDT&E; initial capital investment (covers initial procurement and emplacement of each SPS plant and equipment); replacement capital investment (capital asset replacement over the SPS operating life); operations and maintenance (expendables, minor maintenance, repair crews); and taxes/insurance.

  7. Joint Tactical Radio System Handheld, Manpack, and Small Form Fit Radios (JTRS HMS)

    DTIC Science & Technology

    2013-12-01

    requisitions through the Standard Army Supply System ( SASS ). All radios procured under the Full Rate Production (FRP) phase that become unserviceable...will be turned-in to TYAD through the SASS . Radios will be returned to the original equipment manufacturer vendor for warranty repair, or replacement...procure sustainment spares to replace unserviceable radios and ancillary items requisitioned through SASS , operations, maintenance, training

  8. 24 CFR 905.10 - Capital Fund formula (CFF).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... projects; (ii) Vacancy reduction; (iii) Addressing deferred maintenance needs and the replacement of obsolete utility systems and dwelling equipment; (iv) Planned code compliance; (v) Management improvements...

  9. 24 CFR 905.10 - Capital Fund formula (CFF).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... projects; (ii) Vacancy reduction; (iii) Addressing deferred maintenance needs and the replacement of obsolete utility systems and dwelling equipment; (iv) Planned code compliance; (v) Management improvements...

  10. NASA Glenn Research Center Experience Using DOE Midwest Region Super ESPC

    NASA Technical Reports Server (NTRS)

    Zala, Laszlo F.

    2000-01-01

    The energy crisis of 1973 prompted the Federal Government and private industry to look into alternative methods to save energy. At the same time the constant reduction of operations and maintenance funds during the last 5 years forced Glenn Research Center (GRC) to look for alternative funding sources to meet the mandate to reduce energy consumption. The Super Energy Savings Performance Contract (ESPC) was chosen as a viable source of facility improvement funding that can create larger project scope and help replace aging, inefficient equipment. This paper describes Glenn's participation in the Department of Energy (DOE) Super ESPC program. This program provided Glenn cost savings in the performance of energy audits, preparation of documents, evaluation of proposals, and selection of energy service company (ESCO).

  11. Thermal oxidation saves $500,000, lifts capacity, upholds compliance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harley, C.G.; Nagy, A.J.; Sendecki, M.

    1985-12-01

    The age and destruction of the heat recovery system dictated the replacement of the original fume incinerator at the Congoleum Resilient Flooring Division Plant in Trenton, NJ. The original unit, installed in 1967, had a conventional air-to-oil heat recovery system. Plant personnel placed high priority on finding a replacement with a higher thermal efficiency while still maintaining environmental integrity. A proprietary software program was used to obtain values for NPV (net pressure value) for several competitive equipment systems. The NPV allows simple comparison of equipment based on data such as purchase pgsrice, cost of installation, operating costs, and maintenance costsmore » for the predicted life span of each unit. Based on NPV analysis, a regenerative thermal oxidation unit was selected. To assure expansion capability, Congoleum opted for a 30,000 scfm system. The regenerative thermal oxidation unit consists of a central combustion chamber with five lobes extending radially outward. Each lobe is packed with ceramic refractory elements (saddles) which serve as heat exchange media. The elements are retained by perforated refractory blocks on the hot combustion chamber side and by a grating on the cold side. Estimated savings from the system, about a half million dollars the first year, are expected to significantly exceed Congoleum's original estimates. About half of the total savings will result from reduced consumption of natural gas since the unit is fueled mainly by the organic material in the process exhaust. The other half of the savings has resulted from improvements in production efficiency and the recycling of waste heat from the thermal oxidizer.« less

  12. In Touch with Industry. ICAF Industry Studies 1999

    DTIC Science & Technology

    1999-01-01

    Plant , Hamtramck, MI General Motors Corporation, Warren, MI General Motors Technical Center, Warren, MI General Motors Truck Assembly Plant , Pontiac...indicate that they cannot modernize plant equipment because workers lack the necessary skills to operate more advanced equipment. The National...construct new plants . General Motors is using M&S in new car designs to replace the clumsy clay models previously used. Now, when GM is making design

  13. Stability analysis of multipoint tool equipped with metal cutting ceramics

    NASA Astrophysics Data System (ADS)

    Maksarov, V. V.; Khalimonenko, A. D.; Matrenichev, K. G.

    2017-10-01

    The article highlights the issues of determining the stability of the cutting process by a multipoint cutting tool equipped with cutting ceramics. There were some recommendations offered on the choice of parameters of replaceable cutting ceramic plates for milling based of the conducted researches. Ceramic plates for milling are proposed to be selected on the basis of value of their electrical volume resistivity.

  14. Estimating ages of white-tailed deer: Age and sex patterns of error using tooth wear-and-replacement and consistency of cementum annuli

    USGS Publications Warehouse

    Samuel, Michael D.; Storm, Daniel J.; Rolley, Robert E.; Beissel, Thomas; Richards, Bryan J.; Van Deelen, Timothy R.

    2014-01-01

    The age structure of harvested animals provides the basis for many demographic analyses. Ages of harvested white-tailed deer (Odocoileus virginianus) and other ungulates often are estimated by evaluating replacement and wear patterns of teeth, which is subjective and error-prone. Few previous studies however, examined age- and sex-specific error rates. Counting cementum annuli of incisors is an alternative, more accurate method of estimating age, but factors that influence consistency of cementum annuli counts are poorly known. We estimated age of 1,261 adult (≥1.5 yr old) white-tailed deer harvested in Wisconsin and Illinois (USA; 2005–2008) using both wear-and-replacement and cementum annuli. We compared cementum annuli with wear-and-replacement estimates to assess misclassification rates by sex and age. Wear-and-replacement for estimating ages of white-tailed deer resulted in substantial misclassification compared with cementum annuli. Age classes of females were consistently underestimated, while those of males were underestimated for younger age classes but overestimated for older age classes. Misclassification resulted in an impression of a younger age-structure than actually was the case. Additionally, we obtained paired age-estimates from cementum annuli for 295 deer. Consistency of paired cementum annuli age-estimates decreased with age, was lower in females than males, and decreased as age estimates became less certain. Our results indicated that errors in the wear-and-replacement techniques are substantial and could impact demographic analyses that use age-structure information. 

  15. 40 CFR 61.34 - Air sampling.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... filters, or for replacement of equipment needing major repair. (c) Filters shall be analyzed and concentrations calculated within 30 days after filters are collected. Records of concentrations at all sampling...

  16. 40 CFR 61.34 - Air sampling.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... filters, or for replacement of equipment needing major repair. (c) Filters shall be analyzed and concentrations calculated within 30 days after filters are collected. Records of concentrations at all sampling...

  17. KSC-08pd3238

    NASA Image and Video Library

    2008-10-16

    CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility, or PHSF, at NASA's Kennedy Space Center in Florida, the Orbital Replacement Unit Carrier, or ORUC, is removed from the payload canister which transported the Hubble Space Telescope equipment back to the clean room from Launch Pad 39A. The payload for Hubble servicing mission 4 comprises four carriers holding various equipment for the mission. In the PHSF, the carriers will be stored until a new target launch date in 2009 can be set for Atlantis’ STS-125 mission. Atlantis’ October target launch date was delayed after a device on board Hubble, used in the storage and transmission of science data to Earth, shut down on Sept. 27. Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Jim Grossmann

  18. VHSIC Electronics and the Cost of Air Force Avionics in the 1990s

    DTIC Science & Technology

    1990-11-01

    circuit. LRM Line replaceable module. LRU Line replaceable unit. LSI Large-scale integration. LSTTL Tow-power Schottky Transitor -to-Transistor Logic...displays, communications/navigation/identification, electronic combat equipment, dispensers, and computers. These CERs, which statistically relate the...some of the reliability numbers, and adding the F-15 and F-16 to obtain the data sample shown in Table 6. Both suite costs and reliability statistics

  19. Adaptive Control System of Hydraulic Pressure Based on The Mathematical Modeling

    NASA Astrophysics Data System (ADS)

    Pilipenko, A. V.; Pilipenko, A. P.; Kanatnikov, N. V.

    2016-04-01

    In this paper, the authors highlight the problem of replacing an old heavy industrial equipment, and offer the replacement of obsolete control systems on the modern adaptive control system, which takes into account changes in the hydraulic system of the press and compensates them with a corrective action. The proposed system can reduce a water hammer and thereby increase the durability of the hydraulic system and tools.

  20. The Optical Harness: a light-weight EMI-immune replacement for legacy electrical wiring harnesses

    NASA Astrophysics Data System (ADS)

    Stark, Jason B.; Jackson, B. Scott; Trethewey, William

    2006-05-01

    Electrical wiring harnesses have been used to interconnect control and communication equipment in mobile platforms for over a century. Although they have served this function successfully, they have three problems that are inherent in their design: they are mechanically heavy and stiff, and they are prone to electrical faults, including arcing and Electro-Magnetic Interference (EMI), and they are difficult to maintain when faults occur. These properties are all aspects of the metallic conductors used to build the harnesses. The Optical Harness TM is a photonic replacement for the legacy electrical wiring harness. The Optical Harness TM uses light-weight optical fiber to replace signal wires in an electrical harness. The original electrical connections to the equipment remain, making the Optical Harness TM a direct replacement for the legacy wiring harness. In the backshell of each connector, the electrical signals are converted to optical, and transported on optical fiber, by a deterministic, redundant and fault-tolerant optical network. The Optical Harness TM: * Provides weight savings of 40-50% and unsurpassed flexibility, relative to legacy signal wiring harnesses; * Carries its signals on optical fiber that is free from arcing, EMI, RFI and susceptibility to HPM weapons; * Is self-monitoring during operation, providing non-intrusive predictive and diagnostic capabilities.

  1. Crew interface specifications preparation for in-flight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Parker, F. W.; Carlton, B. E.

    1972-01-01

    The findings and data products developed during the Phase 2 crew interface specification study are presented. Five new NASA general specifications were prepared: operations location coding system for crew interfaces; loose equipment and stowage management requirements; loose equipment and stowage data base information requirements; spacecraft loose equipment stowage drawing requirements; and inflight stowage management data requirements. Additional data was developed defining inflight maintenance processes and related data concepts for inflight troubleshooting, remove/repair/replace and scheduled maintenance activities. The process of maintenance task and equipment definition during spacecraft design and development was also defined and related data concepts were identified for futher development into formal NASA specifications during future follow-on study phases of the contract.

  2. Electronic Repair Concepts for Long-Duration Spaceflight

    NASA Technical Reports Server (NTRS)

    Easton, John; Pettegrew, Richard D.; Struk, Peter M.

    2007-01-01

    Constraints on the mass and volume that can be allocated for electronics spares and repair equipment on long-duration space missions mean that NASA must look at repair strategies beyond the traditional approach, which has been to replace faulty subsystems in a modular form, termed Orbital Replacement Units or Line Replacement Units. Other possible strategies include component and board-level replacement, modular designs that allow reprogramming of less-critical systems to take the place of more critical failed systems, and a blended approach which uses elements of each of these approaches, along with a limited number of Line Replacement Units. This paper presents some of the constraints and considerations that affect the decision on how to approach electronics repair for long duration space missions, and discusses the benefits and limitations of each of the previously mentioned strategies.

  3. 42 CFR 84.201 - Head harnesses; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of pressure over the entire area in contact with the face. (2) Facepieces for single-use vinyl... face. (b) Mouthpieces shall be equipped where applicable, with an adjustable and replaceable harness...

  4. Portable Hydraulic Powerpack

    NASA Technical Reports Server (NTRS)

    Anderson, L. A.; Henry, R. L.; Fedor, O. H.; Owens, L. J.

    1986-01-01

    Rechargeable hydraulic powerpack functions as lightweight, compact source of mechanical energy. Self-contained hydraulic powerpack derives energy from solid chemical charge. Combustion of charge initiated by small hammer, and revolving feeder replaces charges expended. Combustion gases cool during expansion in turbine and not too hot for release to atmosphere. Unit has applications driving wheelchairs and operating drills, winches, and other equipment in remote areas. Also replaces electric motors and internal-combustion engines as source of power in explosive atmospheres.

  5. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, D.; Dakin, B.

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  6. Measure Guideline. Air Conditioner Diagnostics, Maintenance, and Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springer, David; Dakin, Bill

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  7. Maintaining work capacity in the aged worker via progressive resistance training: the implications for occupational therapy practitioners.

    PubMed

    Branch, N G

    1998-01-01

    Society has an interest in maintaining the work capacity of its aging workers. Fewer and fewer younger workers are entering the workforce to replace older citizens no longer able to perform the worker role. There is a demonstrated relationship between increased strength and work capacity, yet the occupational therapy literature emphasizes generalized exercise programming. This type of programming is ineffective at building strength in the elderly worker. High intensity progressive resistance exercise (PRE) can increase strength in the very old worker, yet therapists are hesitant to employ PRE, perhaps due to a potential bias against the use of high intensity PRE with this cohort. Use of PRE may present some difficulties in the clinical situation where continual supervision and resistance training equipment is not available. The adaptive use of functional activities as a resistance training strategy to build strength may be able to overcome the difficulties attendant with the use of PRE while preserving its benefits. Several other implications for occupational therapy practitioners are discussed.

  8. 16. DIAGONAL VIEW TO NORTHWEST OF 1895 ENGINE/PUMP HOUSE SHOWING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. DIAGONAL VIEW TO NORTHWEST OF 1895 ENGINE/PUMP HOUSE SHOWING REPLACEMENT DIESEL ENGINE LOCATIONS AND ASSOCIATED COOLING EQUIPMENT WITH PIPING - Deer Island Pumping Station, Boston, Suffolk County, MA

  9. Alternative Fuels Data Center

    Science.gov Websites

    alternative fuel projects, including the replacement of conventional vehicles with AFVs; the purchase of new purchase of fueling stations or equipment. The maximum loan amount is $500,000 per borrower, and the

  10. KSC-08pd2083

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope is unwrapped and ready for final processing for launch. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  11. KSC-08pd2090

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center remove the protective wrapping from the Flight Support System for the Hubble Space Telescope. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  12. KSC-08pd2082

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  13. KSC-08pd2069

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  14. KSC-08pd2068

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  15. KSC-08pd2065

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  16. KSC-08pd2062

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  17. KSC-08pd2060

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center prepare to lift the Flight Support System for the Hubble Space Telescope from its transportation canister. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  18. KSC-08pd2061

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to lift the Flight Support System for the Hubble Space Telescope from its transportation canister. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  19. KSC-08pd2066

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  20. KSC-08pd2067

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  1. KSC-08pd2091

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center remove the protective wrapping from the Flight Support System for the Hubble Space Telescope. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  2. KSC-08pd2063

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister under the supervision of workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  3. KSC-08pd2064

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister under the supervision of workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. KSC-08pd3239

    NASA Image and Video Library

    2008-10-16

    CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility, or PHSF, at NASA's Kennedy Space Center in Florida, the Orbital Replacement Unit Carrier, or ORUC, is lifted from the payload canister which transported the Hubble Space Telescope equipment back to the clean room from Launch Pad 39A. In the foreground is the Super Lightweight Interchangeable Carrier, or SLIC. The payload for Hubble servicing mission 4 comprises four carriers holding various equipment for the mission. In the PHSF, the carriers will be stored until a new target launch date in 2009 can be set for Atlantis’ STS-125 mission. Atlantis’ October target launch date was delayed after a device on board Hubble, used in the storage and transmission of science data to Earth, shut down on Sept. 27. Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Jim Grossmann

  5. Strategic Dissonance: British Middle East Command in World War II

    DTIC Science & Technology

    2014-05-22

    shipping in the Atlantic Ocean, slowing American replacement of the equipment lost at Dunkirk .4 In the overseas empire, nationalist movements in the...British soldiers were rescued from Greece, they were forced to abandon their equipment just as they had at Dunkirk less than a year earlier.19 Crete fell...at Dunkirk only 10 months earlier, the hasty withdrawl required abandoning aircraft, tanks, trucks, and artillery that were increasingly scarce.62

  6. Case Study Analysis of United States Navy Financial Field Activity

    DTIC Science & Technology

    1991-06-01

    and must be continued in order to keep providing quality base administration. The replacement of ten inch magnetic disk with modem data storage media...Equipment Priority: 3 Total Required Total Funded Shortfall Total Funding: 847K 791K 56K Narrative Description of Requirements: This requirement is...Equipment Priority: 3 Total Required Total Funded Shortfall Total Funding: 847K 791K 56K Narrative Description of Requirements: This deficiency would

  7. Safety in the operating room during orthopedic trauma surgery-incidence of adverse events related to technical equipment and logistics.

    PubMed

    van Delft, E A K; Schepers, T; Bonjer, H J; Kerkhoffs, G M M J; Goslings, J C; Schep, N W L

    2018-04-01

    Safety in the operating room is widely debated. Adverse events during surgery are potentially dangerous for the patient and staff. The incidence of adverse events during orthopedic trauma surgery is unknown. Therefore, we performed a study to quantify the incidence of these adverse events. Primary objective was to determine the incidence of adverse events related to technical equipment and logistics. The secondary objective was to evaluate the consequences of these adverse events. We completed a cross-sectional observational study to assess the incidence, consequences and preventability of adverse events related to technical equipment and logistics during orthopedic trauma surgery. During a 10 week period, all orthopedic trauma operations were evaluated by an observer. Six types of procedures were differentiated: osteosynthesis; arthroscopy; removal of hardware; joint replacement; bone grafting and other. Adverse events were divided in six categories: staff dependent factors; patient dependent factors; anaesthesia; imaging equipment; operation room equipment and instruments and implants. Adverse events were defined as any factor affecting the surgical procedure in a negative way. Hundred-fifty operative procedures were included. In 54% of the procedures, at least one adverse event occurred. In total, 147 adverse events occurred, with a range of 1-5 per procedure. Most adverse events occurred during joint replacement procedures. Thirty-seven percent of the incidents concerned defect, incorrect connected or absent instruments. In 36% of the procedures adverse events resulted in a prolonged operation time with a median prolongation of 10.0 min. In more than half of orthopedic trauma surgical procedures adverse events related to technical equipment and logistics occurred, most of them could easily be prevented. These adverse events could endanger the safety of the patient and staff and should therefore be reduced. 4.

  8. Current status and prospects for in-feed antibiotics in the different stages of pork production — A review

    PubMed Central

    Li, Junyou

    2017-01-01

    Antibiotics have long been of great benefit for people, both in the medical treatment of human disease and in animal food where they improve the growth performance and feed utilization during animal production. Antibiotics as in-feed supplements affect all stages of pork production, including the gestation, nursing, growing, and finishing stages, although the effects show stage-dependent differences. However, the use of antibiotics in animal feed has become a worldwide concern. This review describes why sub-therapeutic levels of antibiotic additives in animal feed have become an integral part of animal feeding programs for more than 70 years, particularly in pork production. It also discusses the threat of the long-term use of sub-therapeutic levels of antibiotics in pork production. In recent years, the effectiveness of in-feed antibiotics has tended to decrease. This review analyzes this change from various perspectives. First, the equipment used at pig farms has improved dramatically and is more sanitary. Worldwide, more pig farms use pig farrowing crates, gestation crates, piglet nursery crates, flooring devices, piggery ventilation and cooler systems, automatic pig feeders, piggery heating equipment, and artificial insemination systems. In addition, scientists have replaced the use of antibiotics with organic acids, fermented mash, probiotics, prebiotics, minerals, oligosaccharides, enzymes, herbs/flavors, and protein/amino acids, and have improved management and husbandry techniques. In addition, animal welfare legislation has been aimed at improving the quality of the floors and living space, ensuring that animals have permanent access to fresh water, and setting a minimum weaning age. Finally, the prospects and the possibility of replacing antibiotics in pork production are described, in line with recent research results. PMID:28823126

  9. Influence of forces acting on side of machine on precision machining of large diameter holes

    NASA Astrophysics Data System (ADS)

    Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.

    2018-03-01

    One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.

  10. RPCM R&R

    NASA Image and Video Library

    2011-10-17

    ISS029-E-029712 (17 Oct. 2011) --- NASA astronaut Mike Fossum, Expedition 29 commander, performs in-flight maintenance (IFM) of removing and replacing the failed Remote Power Controller Module (RPCM) equipment in the Destiny laboratory of the International Space Station.

  11. 49 CFR 175.8 - Exceptions for operator equipment and items of replacement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... gas lighters, perfumes, and portable electronic devices containing lithium cells or batteries that... level of protection to those that would be required by this subchapter. (ii) Aircraft batteries are not...

  12. 49 CFR 175.8 - Exceptions for operator equipment and items of replacement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... lighters, perfumes, and portable electronic devices containing lithium cells or batteries that meet the... level of protection to those that would be required by this subchapter. (ii) Aircraft batteries are not...

  13. 77 FR 27797 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... 4279-2) for the following: Applicant/Location: Samoa Tuna Processors, Inc. Principal Product/Purpose... improvements, replace machinery and equipment and utilities repairs and other upgrades. The plant will be...

  14. Technology management: a perspective on system support, procurement, and replacement planning.

    PubMed

    Dickerson, M L; Jackson, M E

    1992-01-01

    The escalating costs associated with medical technology present a host of challenges for the hospital clinical engineering department. As service and support costs comprise ever larger portions of a system's life cycle cost, innovative management of service provider mix and mechanisms can provide substantial savings in operating expenses. In addition to full-service contracts, the use of demand service and independents has become commonplace. Medical equipment maintenance insurance programs provide yet another service alternative, combining the flexibility of demand service with the safety of a capped budget. These programs have gained acceptance among hospitals as their providers have become more focused on the healthcare market and its many needs. In view of the long-term cost impact surrounding technology procurement, the authors recommend that hospitals refine system evaluation methodologies and develop more comprehensive techniques directed at capital equipment replacement planning. One replacement planning approach, based on an estimation of system value changes, is described and illustrated using data collected through client consultations. Although the validity of this method has not been demonstrated, it represents a simplified approach to life cycle cost analysis and is intended to provide a standard method by which system replacement planning may be quantified. As a departure from system devaluation based solely on depreciation, this method estimates prospective system values derived from anticipated operations and maintenance costs, projected revenue, and the availability of new technology.

  15. A COTS-Based Replacement Strategy for Aging Avionics Computers

    DTIC Science & Technology

    2001-12-01

    Communication Control Unit. A COTS-Based Replacement Strategy for Aging Avionics Computers COTS Microprocessor Real Time Operating System New Native Code...Native Code Objec ts Native Code Thread Real - Time Operating System Legacy Function x Virtual Component Environment Context Switch Thunk Add-in Replace

  16. Replacing the Engine In Your Car While You Are Still Driving It

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bjorklund, Eric A.

    Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with theirmore » own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.« less

  17. Resolving Inadequacies of the Navy Industrial Fund Cost Accounting System to Enable Its Use in the RAMP SMP (Rapid Acquisition of Manufactured Parts Small Manufactured Parts) Facility

    DTIC Science & Technology

    1988-12-01

    maintenance, depreciation , rent, utilities, insurance, and taxes. 6 Historically, manufacturing activities have been labor intensive and man-paced...developed and produced which renders older equipment obsolete sooner. As a result, equipment must be replaced more frequently and depreciation is charged...McIlhattan, 1987). As previously mentioned, automated manufacturing activities incur greater amounts of depreciation expenses more rapidly than a

  18. The PASCO Wireless Smart Cart: A Game Changer in the Undergraduate Physics Laboratory

    NASA Astrophysics Data System (ADS)

    Shakur, Asif; Connor, Rainor

    2018-03-01

    With the introduction of the Wireless Smart Cart by PASCO scientific in April 2016, we expect a paradigm shift in undergraduate physics laboratory instruction. We have evaluated the feasibility of using the smart cart by carrying out experiments that are usually performed using traditional PASCO equipment. The simplicity, convenience, and cost-saving achieved by replacing a plethora of traditional laboratory sensors, wires, and equipment clutter with the smart cart are reported here.

  19. 50 CFR 680.23 - Equipment and operational requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... stored in the scale computer memory is replaced. Scale weights must not be adjusted by the scale operator... for an inspection to NMFS, Alaska Region. An inspection must be requested no less than 10 working days...

  20. Replacing ODCs in a Critical Hand Cleaning Manual Electronics Assembly Operation

    NASA Technical Reports Server (NTRS)

    Bonner, J. K.; Walton, Sharon

    1997-01-01

    The manufacture of high reliability electronics assemblies for spacecraft and ground support equipment still often involves manual assembly processes. In addition, rework and repair of critical assemblies aslo often entails manual assembly processes.

  1. Partial Withdrawal and Final Rule for Nonroad Technical Amendments

    EPA Pesticide Factsheets

    Amendments to the technical hardship provisions under the Transition Program for Equipment Manufacturers related to the Tier 4 standards for nonroad diesel engines, and to the replacement engine exemption generally applicable to new nonroad engines.

  2. 49 CFR 564.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requires the submission of dimensional, electrical specification, and marking/designation information, as specified in appendix A and appendix B of this part, for original equipment replaceable light sources used in motor vehicle headlighting systems. [61 FR 20500, May 7, 1996] ...

  3. Chapter 16: Retrocommissioning Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Tiessen, Alex

    Retrocommissioning (RCx) is a systematic process for optimizing energy performance in existing buildings. It specifically focuses on improving the control of energy-using equipment (e.g., heating, ventilation, and air conditioning [HVAC] equipment and lighting) and typically does not involve equipment replacement. Field results have shown proper RCx can achieve energy savings ranging from 5 percent to 20 percent, with a typical payback of two years or less (Thorne 2003). The method presented in this protocol provides direction regarding: (1) how to account for each measure's specific characteristics and (2) how to choose the most appropriate savings verification approach.

  4. The user's view of commercially available medical technology

    NASA Technical Reports Server (NTRS)

    Harrison, D. C.

    1975-01-01

    The potential user of new medical equipment for imaging the cardiovascular system is often faced with the problem of deciding whether or not to accept a new piece of equipment or a new technological concept into the practice of cardiology. Considerations for acquiring new medical technology are discussed in some detail. Acquisition of new technology should depend on whether the equipment provides more and relevant clinical data, is for research or for limited use, is properly engineered for patient use, presents information in easily storable and retrievable form, is tested and validated clinically, is fabricated by a reliable manufacturer, is cost effective, and may be readily replaced by a new technology.

  5. Designs for surge immunity in critical electronic facilities

    NASA Technical Reports Server (NTRS)

    Roberts, Edward F., Jr.

    1991-01-01

    In recent years, Federal Aviation Administration (FAA) embarked on a program replacing older tube type electronic equipment with newer solid state equipment. This replacement program dramatically increased the susceptibility of the FAA's facilities to lightning related damages. The proposal is presented of techniques which may be employed to lessen the susceptibility of new FAA electronic facility designs to failures resulting from lightning related surges and transients as well as direct strikes. The general concept espoused is one of a consistent system approach employing both perimeter and internal protection. It compares the technique presently employed to reduce electronic noise with other techniques which reduce noise while lowering susceptibility to lightning related damage. It is anticipated that these techniques will be employed in the design of an Air Traffic Control Tower in a high isokeraunic area. This facility would be subjected to rigorous monitoring over a multi-year period to provide quantitative data hopefully supporting the advantage of this design.

  6. STS-109 Crew Interviews - Currie

    NASA Technical Reports Server (NTRS)

    2002-01-01

    STS-109 Mission Specialist 2 Nancy Jane Currie is seen during a prelaunch interview. She answers questions about her inspiration to become an astronaut and her career path. She gives details on the Columbia Orbiter mission which has as its main tasks the maintenance and augmentation of the Hubble Space Telescope (HST). While she will do many things during the mission, the most important will be her role as the primary operator of the robotic arm, which is responsible for grappling the HST, bringing it to the Orbiter bay, and providing support for the astronauts during their EVAs (Extravehicular Activities). Additionally, the robotic arm will be responsible for transferring new and replacement equipment from the Orbiter to the HST. This equipment includes: two solar arrays, a Power Control Unit (PCU), the Advanced Camera for Surveys, and a replacement cooling system for NICMOS (Near Infrared Camera Multi-Object Spectrometer).

  7. KSC-08pd3240

    NASA Image and Video Library

    2008-10-16

    CAPE CANAVERAL, Fla. - In the Payload Hazardous Servicing Facility, or PHSF, at NASA's Kennedy Space Center in Florida, workers watch as the Orbital Replacement Unit Carrier, or ORUC, is lowered from the payload canister which transported the Hubble Space Telescope equipment back to the clean room from Launch Pad 39A. In the foreground is the Super Lightweight Interchangeable Carrier, or SLIC. The payload for Hubble servicing mission 4 comprises four carriers holding various equipment for the mission. In the PHSF, the carriers will be stored until a new target launch date in 2009 can be set for Atlantis’ STS-125 mission. Atlantis’ October target launch date was delayed after a device on board Hubble, used in the storage and transmission of science data to Earth, shut down on Sept. 27. Replacing the broken device will be added to Atlantis’ servicing mission to the telescope. Photo credit: NASA/Jim Grossmann

  8. Problem reporting management system performance simulation

    NASA Technical Reports Server (NTRS)

    Vannatta, David S.

    1993-01-01

    This paper proposes the Problem Reporting Management System (PRMS) model as an effective discrete simulation tool that determines the risks involved during the development phase of a Trouble Tracking Reporting Data Base replacement system. The model considers the type of equipment and networks which will be used in the replacement system as well as varying user loads, size of the database, and expected operational availability. The paper discusses the dynamics, stability, and application of the PRMS and addresses suggested concepts to enhance the service performance and enrich them.

  9. One method for life time estimation of a bucket wheel machine for coal moving

    NASA Astrophysics Data System (ADS)

    Vîlceanu, Fl; Iancu, C.

    2016-08-01

    Rehabilitation of outdated equipment with lifetime expired, or in the ultimate life period, together with high cost investments for their replacement, makes rational the efforts made to extend their life. Rehabilitation involves checking operational safety based on relevant expertise of metal structures supporting effective resistance and assessing the residual lifetime. The bucket wheel machine for coal constitute basic machine within deposits of coal of power plants. The estimate of remaining life can be done by checking the loading on the most stressed subassembly by Finite Element Analysis on a welding detail. The paper presents step-by-step the method of calculus applied in order to establishing the residual lifetime of a bucket wheel machine for coal moving using non-destructive methods of study (fatigue cracking analysis + FEA). In order to establish the actual state of machine and areas subject to study, was done FEA of this mining equipment, performed on the geometric model of mechanical analyzed structures, with powerful CAD/FEA programs. By applying the method it can be calculated residual lifetime, by extending the results from the most stressed area of the equipment to the entire machine, and thus saving time and money from expensive replacements.

  10. Smile, Vandals--You're on Candid Camera.

    ERIC Educational Resources Information Center

    Lebowitz, Michelle

    1997-01-01

    Describes the Huntsville, Alabama, school district's use of surveillance cameras and other high-tech equipment to ward off arson, theft, and vandalism. Discusses how these efforts reduced repair and replacement costs and helped the district retain its insurance coverage. (GR)

  11. Preventive maintenance criteria : final project report.

    DOT National Transportation Integrated Search

    2016-08-15

    The North Carolina Department of Transportation operates a large and varied fleet of on-road and off-road equipment. Regular oil changes for these machines result in significant costs due to the required labor, replacement oil and filters, and dispos...

  12. 76 FR 78526 - Airworthiness Directives; Eclipse Aerospace, Inc. Airplanes Equipped With Pratt & Whitney Canada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... design change for the combustion chamber liner assembly. This new AD retains the requirements of the... compliance with paragraph (g) of this AD, on both engines replace the turbofan engine combustion chamber...

  13. In-house fabrication of precast concrete bridge slabs.

    DOT National Transportation Integrated Search

    1976-01-01

    Information is reported on the labor, equipment, material, and cost required for seven bridge maintenance situations in which state forces widened or replaced an existing short span structure. Precast concrete slabs were installed at three of the loc...

  14. The Combat-System/Ship-System Interface,

    DTIC Science & Technology

    1982-02-01

    sequence initiated by removal of the load shed signal. Re-eneAgize capabitiLty. Provide remotely controlled reclosable power control devices to...signal from the electrical plant control equipment. The power controllers would replace existing circuit breakers and incorporate reclose capability

  15. Retrofitting Steam Turbines with Expired Service Life

    NASA Astrophysics Data System (ADS)

    Dubrovskii, V. G.; Zubov, A. P.; Koshelev, S. A.; Babiev, A. N.; Kremer, V. L.

    2018-06-01

    Many pieces of equipment installed at thermal power stations (TPS) have an expired service life or are close to expiry and are obsolete. In addition, the structure of heat consumption by end users has changed. Among the ways for solving the problem of aging equipment is the retrofitting of turbines that allows for service life recovery and improvement of their performance to the modern level. The service life is recovered through replacement of high-temperature assemblies and parts of a turbine, and the performance is improved by retrofitting and major overhaul of low-temperature assemblies. Implementation of modern engineering solutions and numerical methods in designing upgraded flow paths of steam turbines considerably improves the turbine effectiveness. New flow paths include sabre-like guide vanes, integrally-machined shrouds, and effective honeycomb or axial-radial seals. The flow paths are designed using optimization and hydraulic simulation methods as well as approaches for improving the performance on the turbine blading and internal steam flow paths. Retrofitting of turbines should be performed to meet the customers' needs. The feasibility of implementation of one or another alternative must be determined on a case-by-case basis depending on the turbine conditions, the availability of reserves for generating live steam and supplying circulation water, and the demands and capacities for generation and delivery of power and heat. The main principle of retrofitting is to retain the foundation and the auxiliary and heat-exchange equipment that is fit for further operation. With the example of PT-60-130 and T-100-130, the experience is presented of a comprehensive approach to retrofitting considering the customer's current needs and the actual equipment conditions. Due to the use of modern engineering solutions and procedures, retrofitting yields updating and upgrading of the turbine at a relatively low cost.

  16. Department of the Army Justification of Estimates for Fiscal Year 1983 Submitted to Congress February 1982. Part 2 (Missiles).

    DTIC Science & Technology

    1982-02-01

    STINGER missiles and ground support equipment. The program for FY 1983 represents the sixth year of a planned eleven-year procurement effort designed ...planned eleven year procurement effort designed t., fill the Army’s inventory objective. The STINER, scheduled to replace the obsolete RED-YI, has greater...equipment. This is the fifth year of procurement designed to fill the Army inventory objective. MIRES is a self-propelled, fast- reacting, multiple rocket

  17. AUSSAT - Heralding a new era for Australian telecommunications

    NASA Astrophysics Data System (ADS)

    Harwood, M. D.; Nowland, W. L.

    1986-03-01

    Australian domestic telecommunications entered the space age in late 1985 with the successful launch and commissioning of the first two satellites in the Australian national satellite system - AUSSAT. Many new communications and broadcasting services are now being introduced within Australia and the launch of the third satellite in mid-1986 will open the door to the establishment of cost-effective satellite communications services to the island nations of the south-west Pacific. Even as the first generation system is being established, planning for the second generation system is underway with discussions with both users and equipment suppliers being directed towards refining the conceptual system design. The second generation AUSSAT system will provide replacement capacity for the first generation as well as enhance the range and quality of the services provided through to the turn of the century.

  18. Probabilistic modelling to assess exposure to three artificial sweeteners of young Irish patients aged 1-3 years with PKU and CMPA.

    PubMed

    O'Sullivan, Aaron J; Pigat, Sandrine; O'Mahony, Cian; Gibney, Michael J; McKevitt, Aideen I

    2016-11-01

    The choice of suitable normal foods is limited for individuals with particular medical conditions, e.g., inborn errors of metabolism (phenylketonuria - PKU) or severe cow's milk protein allergy (CMPA). Patients may have dietary restrictions and exclusive or partial replacement of specific food groups with specially formulated products to meet particular nutrition requirements. Artificial sweeteners are used to improve the appearance and palatability of such food products to avoid food refusal and ensure dietary adherence. Young children have a higher risk of exceeding acceptable daily intakes for additives than adults due to higher food intakes kg -1 body weight. The Budget Method and EFSA's Food Additives Intake Model (FAIM) are not equipped to assess partial dietary replacement with special formulations as they are built on data from dietary surveys of consumers without special medical requirements impacting the diet. The aim of this study was to explore dietary exposure modelling as a means of estimating the intake of artificial sweeteners by young PKU and CMPA patients aged 1-3 years. An adapted validated probabilistic model (FACET) was used to assess patients' exposure to artificial sweeteners. Food consumption data were derived from the food consumption survey data of healthy young children in Ireland from the National Preschool and Nutrition Survey (NPNS, 2010-11). Specially formulated foods for special medical purposes were included in the exposure model to replace restricted foods. Inclusion was based on recommendations for adequate protein intake and dietary adherence data. Exposure assessment results indicated that young children with PKU and CMPA have higher relative average intakes of artificial sweeteners than healthy young children. The reliability and robustness of the model in the estimation of patient additive exposures was further investigated and provides the first exposure estimates for these special populations.

  19. RPCM R&R

    NASA Image and Video Library

    2011-10-17

    ISS029-E-029720 (17 Oct. 2011) --- NASA astronaut Mike Fossum, Expedition 29 commander, uses a communication system while performing in-flight maintenance (IFM) of removing and replacing the failed Remote Power Controller Module (RPCM) equipment in the Destiny laboratory of the International Space Station.

  20. Weatherproofing a Great, Good Place.

    ERIC Educational Resources Information Center

    Cisler, Steve

    1996-01-01

    Discusses the effects of technological change and demographic shifts on the future of public libraries. Topics include displacement through disintermediation (replacing professional librarians with automated systems), the voucher movement, impact of new media on publishing, new information aggregators, cheaper computing equipment and Internet…

  1. Energy Conservation: Three Projects That Worked.

    ERIC Educational Resources Information Center

    American School and University, 1981

    1981-01-01

    Compact design and insulation cut energy use at a junior high school in Rexon (New Brunswick). Loma Linda University in California has reduced consumption of natural gas by installing cogeneration equipment. Morningside College in Sioux City (Iowa) has replaced deteriorating windows. (Author/MLF)

  2. 44 CFR 9.5 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and 306; (2) Emergency Support Teams (section 304); (3) Unemployment Assistance (section 407); (4...) actions: (i) Housing needs or expenses, except for restoring, repairing or building private bridges...) Replacement of building contents, materials and equipment. (sections 402 and 419). (4) Repairs under section...

  3. 44 CFR 9.5 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and 306; (2) Emergency Support Teams (section 304); (3) Unemployment Assistance (section 407); (4...) actions: (i) Housing needs or expenses, except for restoring, repairing or building private bridges...) Replacement of building contents, materials and equipment. (sections 402 and 419). (4) Repairs under section...

  4. 44 CFR 9.5 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and 306; (2) Emergency Support Teams (section 304); (3) Unemployment Assistance (section 407); (4...) actions: (i) Housing needs or expenses, except for restoring, repairing or building private bridges...) Replacement of building contents, materials and equipment. (sections 402 and 419). (4) Repairs under section...

  5. Teaching with Technology: The Classroom Manager. Cost-Conscious Computing.

    ERIC Educational Resources Information Center

    Smith, Rhea; And Others

    1992-01-01

    Teachers discuss how to make the most of technology in the classroom during a tight economy. Ideas include recycling computer printer ribbons, buying replacement batteries for computer power supply packs, upgrading via software, and soliciting donated computer equipment. (SM)

  6. 7 CFR 761.2 - Abbreviations and definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., tree farming, nursery crops, nuts, aquaculture species, and other plant and animal production, as..., reptiles, or aquatic plants) raised in a controlled or selected environment of which the applicant has... machinery, equipment, vehicles, foundation and breeding livestock herds and flocks, including replacements...

  7. KCBX Letter to EPA - Aug. 27, 2014

    EPA Pesticide Factsheets

    A quality control check revealed that temperature data for June 26-Aug. 6, 2014 from the meteorological monitor at NT-NW was not accurate. KCBX replaced the invalidated data with hourly ambient temperature data from other equipment and sent updated files.

  8. Evaluating selection and efficacy of pressure-relieving equipment.

    PubMed

    Chaloner, Donna; Stevens, Jenny

    2003-06-01

    The drive towards evidence-based practice has highlighted the lack of randomized controlled trials that compare interventions such as pressure-relieving medical devices. This may influence practitioners, particularly purchasing practitioners, to consider other types of evidence when appraising literature to determine clinical practice and support recommendations and local guidelines. This article will illustrate the development of an audit tool used to evaluate nurses' knowledge and skills in patient assessment, selection and installation of appropriate pressure-relieving equipment. The tool also assists in assessing clinical effectiveness and user satisfaction of equipment. This article focuses on a small audit of the Karomed Ltd Transair 1500 (also known as the 3-Comm) mattress replacement system.

  9. Projecting the need for hip replacement over the next three decades: influence of changing demography and threshold for surgery

    PubMed Central

    Birrell, F.; Johnell, O.; Silman, A.

    1999-01-01

    OBJECTIVES—To estimate the requirement for total hip replacement in the United Kingdom over the next three decades
METHODS—Projection of age and sex specific hip replacements in the UK over 10 year intervals taking account of demographic change and the extrapolation of arthroplasty rates from Sweden; a country with recently introduced guidelines.
RESULTS—Assuming no change in the age and sex specific arthroplasty rates, the estimated number of hip replacements will increase by 40% over the next 30 year period because of demographic change alone. The proportionate change will be substantially higher in men (51%) than women (33%), with a doubling of the number of male hip replacements in those aged over 85. Changes in the threshold for surgery may increase this further—up to double the current number.
CONCLUSION—A sharp rise in hip replacements will be needed to satisfy needs in the UK population over the next 30 years.

 PMID:10460191

  10. 48 CFR 52.225-7 - Waiver of Buy American Statute for Civil Aircraft and Related Articles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... incorporation into the aircraft; and (4) Any ground flight simulators, and parts and components of these simulators, for use with respect to the aircraft, whether to be used as original or replacement equipment in...

  11. 7 CFR 764.353 - Limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... unable to obtain hazard insurance for the chicken house; (ii) Uses the loan to rebuild the chicken house... hazard insurance (excluding labor, machinery, equipment, or materials contributed by the applicant to... estate, covered by hazard insurance; (3) Add the value of replacement livestock and livestock products...

  12. 7 CFR 764.353 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... unable to obtain hazard insurance for the chicken house; (ii) Uses the loan to rebuild the chicken house... hazard insurance (excluding labor, machinery, equipment, or materials contributed by the applicant to... estate, covered by hazard insurance; (3) Add the value of replacement livestock and livestock products...

  13. 7 CFR 764.353 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... unable to obtain hazard insurance for the chicken house; (ii) Uses the loan to rebuild the chicken house... hazard insurance (excluding labor, machinery, equipment, or materials contributed by the applicant to... estate, covered by hazard insurance; (3) Add the value of replacement livestock and livestock products...

  14. 7 CFR 764.353 - Limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... unable to obtain hazard insurance for the chicken house; (ii) Uses the loan to rebuild the chicken house... hazard insurance (excluding labor, machinery, equipment, or materials contributed by the applicant to... estate, covered by hazard insurance; (3) Add the value of replacement livestock and livestock products...

  15. Monitoring the vaccine cold chain.

    PubMed

    Cheriyan, E

    1993-11-01

    Maintaining the vaccine cold chain is an essential part of a successful immunisation programme. A continuous electronic temperature monitor helped to identify breaks in the cold chain in the community and the study led to the issue of proper guidelines and replacement of faulty equipment.

  16. Top Ten Concerns for Trustees in 1988.

    ERIC Educational Resources Information Center

    Meyerson, Joel W.

    1988-01-01

    Ten issues most likely to influence institutions this year include tuition policy and financing, capital renewal and replacement, charitable giving, scientific equipment and laboratories, endowment management and spending policy, research funding, corporate contributions, minority enrollment and hiring, debt financing and debt capacity, and cost…

  17. 47 CFR 78.107 - Equipment and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....107 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE... by or under the immediate supervision of a person with required knowledge and skill to perform such... require no particular skill may be made by an unskilled person. Repairs requiring replacement of attached...

  18. 47 CFR 78.107 - Equipment and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....107 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE... by or under the immediate supervision of a person with required knowledge and skill to perform such... require no particular skill may be made by an unskilled person. Repairs requiring replacement of attached...

  19. 47 CFR 78.107 - Equipment and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....107 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE... by or under the immediate supervision of a person with required knowledge and skill to perform such... require no particular skill may be made by an unskilled person. Repairs requiring replacement of attached...

  20. 47 CFR 78.107 - Equipment and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....107 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE... by or under the immediate supervision of a person with required knowledge and skill to perform such... require no particular skill may be made by an unskilled person. Repairs requiring replacement of attached...

  1. Hormone replacement therapy and risk of malignancy.

    PubMed

    Diamanti-Kandarakis, Evanthia

    2004-02-01

    The fact that today our concern is oriented towards the risks rather than the benefits of hormone replacement therapy could be the clearest message about our current position. The safety of hormone replacement therapy, an estrogen-progestin combination which has been sympathetic to and supportive of disturbing menopausal symptoms of women, is seriously challenged. Four randomized trials have now reported on the results of hormone replacement therapy in major potentially fatal conditions, in more than 20,000 women studied for about 5 years. The main concern regarding the increased risk of malignancy in healthy postmenopausal women in western countries has been breast cancer. It is estimated to cause an extra case in about six per 1000 users aged 50-59 and 12 per 1000 aged 60-69. Over the same period the estimated risk of endometrial cancer rates are not increased, with a relative risk of 0.76 per 1000 users aged 50-59. Overall, however, the increased incidence of malignancies is greater than any reduction, one per 230 users aged 50-59 and one per 150 aged 60-69. Randomized trials examining other important but rarer malignancies, like ovarian, gall bladder and urinary bladder cancer, are either nonexistent or too small to reliably describe any effects of hormone replacement therapy. Conclusively epidemiological evidence suggests that hormone replacement therapy is associated with a small but substantial increase in breast cancer risk and combined estrogen-progesterone regimens further increase this hazard. Additionally, the evidence from the recent double blind placebo controlled randomized trial on the slight increase in the incidence of adverse cardiovascular events, has turned our orientation away from hormone replacement therapy as a long term therapy in postmenopausal women. In this review, the effort is to approach comprehensively and globally the information on the risks of hormone replacement therapy on several cancer sites.

  2. Frequency and impact of informant replacement in Alzheimer disease research.

    PubMed

    Grill, Joshua D; Zhou, Yan; Karlawish, Jason; Elashoff, David

    2015-01-01

    Informants serve an essential role in Alzheimer disease research. Were an informant to be replaced during a longitudinal study, this could have negative implications. We used data from the National Alzheimer's Coordinating Center Uniform Data Set to examine the frequency of informant replacement among Alzheimer disease dementia participants, whether patient and informant characteristics were associated with replacement, and how replacement affected research outcome measures. Informant replacement was common (15.5%) and typically occurred after the first or the second research visit. Adult child (24%) and other (38%) informants were more frequently replaced than spouse informants (10%). Older spouse informant age and younger adult child informant age were associated with replacement. The between-visit change in Functional Assessment Questionnaire scores was greater in patients who replaced informants than in those with stable informants. Clinical Dementia Rating-Sum of Boxes, Functional Assessment Questionnaire, and Neuropsychiatric Inventory scores showed greater variability in between-visit change in patients who replaced informants compared with those with stable informants. These findings suggest that informant replacement is relatively common, may have implications to study analyses, and warrant further examination in the setting of clinical trials.

  3. KSC-08pd2361

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover has been installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  4. KSC-08pd2358

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help guide the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  5. KSC-08pd2357

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lowers the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  6. KSC-08pd2359

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  7. KSC-08pd2354

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover awaits a move to be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  8. KSC-08pd2360

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover into place on the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  9. Comparison of HFC-134a and the ternary blend, Suva MP39, as replacements for the refrigerant, CGC-12

    NASA Astrophysics Data System (ADS)

    Fletcher, Lyn E.

    1993-09-01

    The refrigerant gas CFC-12 has been widely used in Royal Australian Navy (RAN) equipment. With the Montreal protocol phase-out of this and other ozone depleting substances, alternative refrigerant gases must be identified. These replacements would ideally have the same efficiency as CFC-12, cause no health and safety risks and allow changeover to proceed with minimal costs. This paper reviews the attributes of two refrigerant gases, HFC-134a and Suva MP39, which are being considered by the RAN.

  10. Hubble (HST) hardware is uncrated in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container to move it to a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  11. Hubble (HST) hardware is uncrated in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  12. KSC-99pp1043

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container to move it to a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  13. KSC-99pp1042

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), a crane lifts equipment for mission STS-103 out of its shipping container. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  14. KSC-99pp1044

    NASA Image and Video Library

    1999-08-13

    In the Payload Hazardous Servicing Facility (PHSF), workers check the placement of equipment, part of mission STS-103, onto a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a "call-up" mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review

  15. Hubble (HST) hardware is moved to a workstand in the PHSF

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility (PHSF), workers check the placement of equipment, part of mission STS-103, onto a workstand. The equipment is the first part of payload flight hardware for the third Hubble Space Telescope Servicing Mission (SM-3A). The hardware will undergo final testing and integration of payload elements in the PHSF. Mission STS-103 is a 'call-up' mission which is being planned due to the need to replace portions of the Hubble's pointing system, the gyros, which have begun to fail. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. Launch of STS-103 is currently targeted for Oct. 14 but the date is under review.

  16. Using PHM to measure equipment usable life on the Air Force's next generation reusable space booster

    NASA Astrophysics Data System (ADS)

    Blasdel, A.

    The U.S. Air Force procures many launch vehicles and launch vehicle services to place their satellites at their desired location in space. The equipment on-board these satellite and launch vehicle often suffer from premature failures that result in the total loss of the satellite or a shortened mission life sometimes requiring the purchase of a replacement satellite and launch vehicle. The Air Force uses its EELV to launch its high priority satellites. Due to a rise in the cost of purchasing a launch using the Air Force's EELV from 72M in 1997 to as high as 475M per launch today, the Air Force is working to replace the EELV with a reusable space booster (RSB). The RSB will be similar in design and operations to the recently cancelled NASA reusable space booster known as the Space Shuttle. If the Air Force uses the same process that procures the EELV and other launch vehicles and satellites, the RSB will also suffer from premature equipment failures thus putting the payloads at a similar high risk of mission failure. The RSB is expected to lower each launch cost by 50% compared to the EELV. The development of the RSB offers the Air Force an opportunity to use a new reliability paradigm that includes a prognostic and health management program and a condition-based maintenance program. These both require using intelligent, decision making self-prognostic equipment The prognostic and health management program and its condition-based maintenance program allows increases in RSB equipment usable life, lower logistics and maintenance costs, while increasing safety and mission assurance. The PHM removes many decisions from personnel that, in the past resulted in catastrophic failures and loss of life. Adding intelligent, decision-making self-prognostic equipment to the RSB will further decrease launch costs while decreasing risk and increasing safety and mission assurance.

  17. Importance of milk replacer intake and composition in rearing orphan foals

    PubMed Central

    Cymbaluk, Nadia F.; Smart, Marion E.; Bristol, Frank M.; Pouteaux, Victor A.

    1993-01-01

    Effects of milk replacer composition and intake on the growth of orphan foals were evaluated. Twenty foals were assigned to four treatments: 1) mare-nursed, 2) commercial foal milk replacer at recommended intakes (standard), 3) commercial foal milk replacer at high intakes (high), and 4) acidified replacer at recommended intakes (acidified). Foals fed milk replacer diets were weaned at 12-24 hours postpartum and fed milk replacer for 50 days. Mare-nursed foals were weaned between 52 and 56 days of age. Foals fed replacer diets gained 12% to 28% less weight than mare-nursed foals up to two weeks of age. However, by four months of age, weights of replacer-fed foals were similar to those of mare-nursed foals and 32 other mare-nursed foals at the farm weaned between three and four months postparium. Foals drank 10 to 12 L/100 kg body weight (BW) in fluid replacer daily over the trial period. During the first week, high intake foals consumed 26% more replacer (p<0.05) than foals fed acidified or standard diets. This higher intake resulted in diarrhea earlier (6-11 days vs 11-22 days) and for a longer time (6.3 days vs 2.5-3.6 days) than in foals fed recommended amounts. Mare-nursed foals developed “foal heat scours” in the second week postpartum. After the first week, foals fed high replacer diet voluntarily consumed the same volume of fluid replacer as foals fed the standard intake. Foals ate less than 1 kg grain mix/100 kg BW daily to one month of age, then increased intake to 1.5-2 kg/ 100 kg BW to weaning. Water intake was 20-40% of daily fluid intake and was correlated (r = 0.85) to dry matter intake. Foals in the high intake group ate less (p<0.05) solid feed and drank less water than foals fed the standard and acidified diets. The foal's stomach capacity appears to limit meal size and thus replacer intake. If recommended feeding intervals are used, replacer intakes by foals are less than 15% BW daily. High volume intakes appeared to prolong diarrhea. Normal growth rates occur when replacer and good-quality feeds are fed concurrently. PMID:17424268

  18. 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-08-01

    Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less

  19. A feasibility randomised controlled trial of pre-operative occupational therapy to optimise recovery for patients undergoing primary total hip replacement for osteoarthritis (PROOF-THR).

    PubMed

    Jepson, Paul; Sands, Gina; Beswick, Andrew D; Davis, Edward T; Blom, Ashley W; Sackley, Catherine M

    2016-02-01

    To assess the feasibility of a pre-operative occupational therapy intervention for patients undergoing primary total hip replacement. Single blinded feasibility randomised controlled trial, with data collection prior to the intervention, and at 4, 12, and 26 weeks following surgery. Recruitment from two NHS orthopaedic outpatient centres in the West Midlands, UK. Patients awaiting primary total hip replacement due to osteoarthritis were recruited. Following pre-operative assessment, patients were individually randomised to intervention or control by a computer-generated block randomisation algorithm stratified by age and centre. The intervention group received a pre-surgery home visit by an occupational therapist who discussed expectations, assessed home safety, and provided appropriate adaptive equipment. The control group received treatment as usual. The study assessed the feasibility of recruitment procedures, delivery of the intervention, appropriateness of outcome measures and data collection methods. Health related quality of life and resource use were recorded at 4, 12 and 26 weeks. Forty-four participants were recruited, 21 were randomised to the occupational therapy intervention and 23 to usual care. Analysis of 26 week data included 18 participants in the intervention group and 21 in the control. The intervention was delivered successfully with no withdrawals or crossovers; 5/44 were lost to follow-up with further missing data for participation and resource use. The feasibility study provided the information required to conduct a definitive trial. Burden of assessment would need to be addressed. A total of 219 patients would be required in an efficacy trial. © The Author(s) 2015.

  20. Pulpal blood flow recorded from human premolar teeth with a laser Doppler flow meter using either red or infrared light.

    PubMed

    Kijsamanmith, Kanittha; Timpawat, Siriporn; Vongsavan, Noppakun; Matthews, Bruce

    2011-07-01

    To compare red (635 nm) and infrared (780 nm) light for recording pulpal blood flow from human premolar teeth. Recordings were made from 11 healthy teeth in 9 subjects (aged 16-30 years) using a laser Doppler flow meter (Periflux 4001) equipped with both red and infrared lasers. Average blood flow signals were obtained with both light sources alternately from each tooth under five conditions: intact tooth without opaque rubber dam, intact tooth with dam, after injecting local anaesthetic (3% Mepivacaine) (LA) over the apex of the tooth and cavity preparation to almost expose the pulp, after removal and replacement of the pulp, and with the root canal empty. With infrared light, the dam significantly decreased the mean blood flow by 80%. Injecting LA and cavity preparation had no significant effect. Removal and replacement of the pulp reduced the mean blood flow by 58%. There was no further change when the pulp was removed. With red light, the dam reduced the signal from intact teeth by 60%. Injecting LA and cavity preparation had no significant effect. The signal fell by 67% after pulp removal and replacement and did not change significantly when the pulp was removed. Opaque rubber dam minimises the contribution of non-pulpal tissues to the laser Doppler signal recorded from premolars. Using dam, the pulp contributed about 60% to the blood flow signal with both red and infrared light. The difference between them in this respect was not significant. Copyright © 2010 Elsevier Ltd. All rights reserved.

  1. Testing of electrical equipment for a commercial grade dedication program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, J.L.; Srinivas, N.

    1995-10-01

    The availability of qualified safety related replacement parts for use in nuclear power plants has decreased over time. This has caused many nuclear power plants to purchase commercial grade items (CGI) and utilize the commercial grade dedication process to qualify the items for use in nuclear safety related applications. The laboratories of Technical and Engineering Services (the testing facility of Detroit Edison) have been providing testing services for verification of critical characteristics of these items. This paper presents an overview of the experience in testing electrical equipment with an emphasis on fuses.

  2. VTR...Education's Benevolent Humility Device.

    ERIC Educational Resources Information Center

    Ciampa, Bartholomew J.

    The use of television videotape equipment is an effective shortcut in replacing the inexperienced undergraduate concept of teaching is a 'gut' experience with a realistic concept of teaching; it nurtures humility without subjecting the student to humiliation. In the Nasson College secondary teacher education program, microteaching with videotape…

  3. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...

  4. Cotton-Fiber-Filled Rubber Insulation

    NASA Technical Reports Server (NTRS)

    Anderson, Floyd A.

    1987-01-01

    Carbonization of fibers at high temperatures improves strength and erosion resistance. Cotton linters tested as replacement for asbestos filler currently used in rubber insulation in solid rocket motors. Cotton-filled rubber insulation has industrial uses; in some kinds of chemical- or metal-processing equipment, hoses, and protective clothing.

  5. Is That Boiler Ready To Blow?

    ERIC Educational Resources Information Center

    Robinson, Glenn S.; Trombley, Robert E.

    2001-01-01

    Discusses implementation of a thorough assessment program to determine the condition of boilers, pressure vessels and other plant equipment to determine the feasibility of part or entire system replacement. Assessment basics are examined as are tips for selecting the right inspection and engineering contractor for assessments. (GR)

  6. Major General Melvin Zais and Hamburger Hill

    DTIC Science & Technology

    2012-12-06

    Vietnamese were massing men, supplies, and equipment for a spring offensive) by employing tactics influenced by American material superiority.8 Since 1966...Timeline.” 33 Following the decision to replace 3-187 Infantry with 2-506 Infantry, the Iron Rakkasan commander, Lt. Col. Weldon F. Honeycutt

  7. Staying Secure for School Safety

    ERIC Educational Resources Information Center

    Youngkin, Minu

    2012-01-01

    Proper planning and preventive maintenance can increase school security and return on investment. Preventive maintenance begins with planning. Through careful planning, education institutions can determine what is working and if any equipment, hardware or software needs to be replaced or upgraded. When reviewing a school's safety and security…

  8. Nondestructive testing of railroad wheels and rails by ultrasonics

    NASA Technical Reports Server (NTRS)

    Clotfelter, W. M.; Risch, E. R.

    1974-01-01

    Quality control of wheels and rails can be improved by using ultrasonic technique developed for measuring stresses in metallic materials. In addition, parts already in use can be tested and replaced if they are found to be unsafe. Test equipment includes two transducers.

  9. FILTRATION OF SALT SMOKE FROM CHLORATE CANDLE OXYGEN.

    DTIC Science & Technology

    their associated equipment for use on submarines. Rockwool -wire mesh combinations were first used in welded assemblies which were cleaned by water...washing when they became clogged. The rockwool was later replaced with fiberglass blanket, and two modifications of the assembly were made, but the

  10. Controversial endocrine interventions for the aged.

    PubMed

    Leow, M K S; Loh, K C

    2006-07-01

    Specific endocrine changes occur with the ageing process. The last decade has witnessed significant progress in the basic and clinical science of ageing, thereby rejuvenating the interest in anti-ageing medicine, especially that of hormone replacement, by medical professionals and the lay public. However, endocrine manipulation as a therapeutic strategy for ageing is still evolving as continuing research attempts to answer the many questions of what it can achieve at the risk of incurring unknown long-term adverse effects. The current day doctor is confronted with a host of options, and will benefit from a synopsis of the latest evidence before making the most appropriate decision for aged patients seeking hormonal replacement therapy as a means to counter the effects of ageing. This review aims to give a rapid overview of the endocrine profile of geriatric population and the studies on the more controversial hormonal replacement therapies for the aged.

  11. Minimizing the dependency ratio in a population with below-replacement fertility through immigration

    PubMed Central

    Simon, C.; Belyakov, A.O.; Feichtinger, G.

    2012-01-01

    Many industrialized countries face fertility rates below replacement level, combined with declining mortality especially in older ages. Consequently, the populations of these countries have started to age. One important indicator of age structures is the dependency ratio which is the ratio of the nonworking age population to the working age population. In this work we find the age-specific immigration profile that minimizes the dependency ratio in a stationary population with below-replacement fertility. It is assumed that the number of immigrants per age is limited. We consider two alternative policies. In the first one, we fix the total number of people who annually immigrate to a country. In the second one, we prescribe the size of the receiving country’s population. For both cases we provide numerical results for the optimal immigration profile, for the resulting age structure of the population, as well as for the dependency ratio. PMID:22781918

  12. Comparison of survival analysis and palliative care involvement in patients aged over 70 years choosing conservative management or renal replacement therapy in advanced chronic kidney disease.

    PubMed

    Hussain, Jamilla A; Mooney, Andrew; Russon, Lynne

    2013-10-01

    There are limited data on the outcomes of elderly patients with chronic kidney disease undergoing renal replacement therapy or conservative management. We aimed to compare survival, hospital admissions and palliative care access of patients aged over 70 years with chronic kidney disease stage 5 according to whether they chose renal replacement therapy or conservative management. Retrospective observational study. Patients aged over 70 years attending pre-dialysis clinic. In total, 172 patients chose conservative management and 269 chose renal replacement therapy. The renal replacement therapy group survived for longer when survival was taken from the time estimated glomerular filtration rate <20 mL/min (p < 0.0001), <15 mL/min (p < 0.0001) and <12 mL/min (p = 0.002). When factors influencing survival were stratified for both groups independently, renal replacement therapy failed to show a survival advantage over conservative management, in patients older than 80 years or with a World Health Organization performance score of 3 or more. There was also a significant reduction in the effect of renal replacement therapy on survival in patients with high Charlson's Comorbidity Index scores. The relative risk of an acute hospital admission (renal replacement therapy vs conservative management) was 1.6 (p < 0.05; 95% confidence interval = 1.14-2.13). A total of 47% of conservative management patients died in hospital, compared to 69% undergoing renal replacement therapy (Renal Registry data). Seventy-six percent of the conservative management group accessed community palliative care services compared to 0% of renal replacement therapy patients. For patients aged over 80 years, with a poor performance status or high co-morbidity scores, the survival advantage of renal replacement therapy over conservative management was lost at all levels of disease severity. Those accessing a conservative management pathway had greater access to palliative care services and were less likely to be admitted to or die in hospital.

  13. KSC-08pd2092

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the protective wrapping has been removed from the Flight Support System for the Hubble Space Telescope revealing the soft capture mechanism , or SCM. The SCM will be permanently attached to Hubble’s aft shroud by spacewalking astronauts and will provide a rendezvous and docking target that can be easily seen and recognized by a docking vehicle. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  14. KSC-08pd0037

    NASA Image and Video Library

    2008-01-13

    KENNEDY SPACE CENTER, FLA. -- Lloyd Johns, with Lockheed Martin, prepares the area where the replacement feed-through connector in the engine cutoff, or ECO, sensor system on space shuttle Atlantis' external tank will be installed. Seen next to Johns' arm is the internal connector. The area is wrapped in material for weather protection. Berger wears safety equipment as helium gas is employed to keep the equipment under wrap dry. The feed-through connector passes the wires from the inside of the tank to the outside. Results of a tanking test on Dec. 18 pointed to an open circuit in the feed-through connector wiring, which is located at the base of the tank. The pins in the replacement connector have been precisely soldered to create a connection that allows sensors inside the tank to send signals to the computers onboard Atlantis. The work is being done on Launch Pad 39A. Space shuttle Atlantis is now targeted for launch on Feb. 7. Photo credit: NASA/George Shelton

  15. The effect of patient age at intervention on risk of implant revision after total replacement of the hip or knee: a population-based cohort study.

    PubMed

    Bayliss, Lee E; Culliford, David; Monk, A Paul; Glyn-Jones, Sion; Prieto-Alhambra, Daniel; Judge, Andrew; Cooper, Cyrus; Carr, Andrew J; Arden, Nigel K; Beard, David J; Price, Andrew J

    2017-04-08

    Total joint replacements for end-stage osteoarthritis of the hip and knee are cost-effective and demonstrate significant clinical improvement. However, robust population based lifetime-risk data for implant revision are not available to aid patient decision making, which is a particular problem in young patient groups deciding on best-timing for surgery. We did implant survival analysis on all patients within the Clinical Practice Research Datalink who had undergone total hip replacement or total knee replacement. These data were adjusted for all-cause mortality with data from the Office for National Statistics and used to generate lifetime risks of revision surgery based on increasing age at the time of primary surgery. We identified 63 158 patients who had undergone total hip replacement and 54 276 who had total knee replacement between Jan 1, 1991, and Aug 10, 2011, and followed up these patients to a maximum of 20 years. For total hip replacement, 10-year implant survival rate was 95·6% (95% CI 95·3-95·9) and 20-year rate was 85·0% (83·2-86·6). For total knee replacement, 10-year implant survival rate was 96·1% (95·8-96·4), and 20-year implant survival rate was 89·7% (87·5-91·5). The lifetime risk of requiring revision surgery in patients who had total hip replacement or total knee replacement over the age of 70 years was about 5% with no difference between sexes. For those who had surgery younger than 70 years, however, the lifetime risk of revision increased for younger patients, up to 35% (95% CI 30·9-39·1) for men in their early 50s, with large differences seen between male and female patients (15% lower for women in same age group). The median time to revision for patients who had surgery younger than age 60 was 4·4 years. Our study used novel methodology to investigate and offer new insight into the importance of young age and risk of revision after total hip or knee replacement. Our evidence challenges the increasing trend for more total hip replacements and total knee replacements to be done in the younger patient group, and these data should be offered to patients as part of the shared decision making process. Oxford Musculoskeletal Biomedical Research Unit, National Institute for Health Research. Copyright © 2017 The Author(s). Published by Elsevier Ltd. This is an Open Access article under the CC BY license. Published by Elsevier Ltd.. All rights reserved.

  16. Is Low Fertility Really a Problem? Population Aging, Dependency, and Consumption*

    PubMed Central

    2015-01-01

    Longer lives and fertility far below the replacement level of 2.1 births per woman are leading to rapid population aging in many countries. Many observers are concerned that aging will adversely affect public finances and standards of living. Analysis of newly available National Transfer Accounts data for 40 countries shows that fertility well above replacement would typically be most beneficial for government budgets. However, fertility near replacement would be most beneficial for standards of living when the analysis includes the effects of age structure on families as well as governments. And fertility below replacement would maximize per capita consumption when the cost of providing capital for a growing labor force is taken into account. While low fertility will indeed challenge government programs and very low fertility undermines living standards, we find that moderately low fertility and population decline favor the broader material standard of living PMID:25301626

  17. New evaporator station for the center for accelerator target science

    NASA Astrophysics Data System (ADS)

    Greene, John P.; Labib, Mina

    2018-05-01

    As part of an equipment grant provided by DOE-NP for the Center for Accelerator Target Science (CATS) initiative, the procurement of a new, electron beam, high-vacuum deposition system was identified as a priority to insure reliable and continued availability of high-purity targets. The apparatus is designed to contain TWO electron beam guns; a standard 4-pocket 270° geometry source as well as an electron bombardment source. The acquisition of this new system allows for the replacement of TWO outdated and aging vacuum evaporators. Also included is an additional thermal boat source, enhancing our capability within this deposition unit. Recommended specifications for this system included an automated, high-vacuum pumping station, a deposition chamber with a rotating and heated substrate holder for uniform coating capabilities and incorporating computer-controlled state-of-the-art thin film technologies. Design specifications, enhanced capabilities and the necessary mechanical modifications for our target work are discussed.

  18. An Investment Level Decision Method to Secure Long-term Reliability

    NASA Astrophysics Data System (ADS)

    Bamba, Satoshi; Yabe, Kuniaki; Seki, Tomomichi; Shibaya, Tetsuji

    The slowdown in power demand increase and facility replacement causes the aging and lower reliability in power facility. And the aging is followed by the rapid increase of repair and replacement when many facilities reach their lifetime in future. This paper describes a method to estimate the repair and replacement costs in future by applying the life-cycle cost model and renewal theory to the historical data. This paper also describes a method to decide the optimum investment plan, which replaces facilities in the order of cost-effectiveness by setting replacement priority formula, and the minimum investment level to keep the reliability. Estimation examples applied to substation facilities show that the reasonable and leveled future cash-out can keep the reliability by lowering the percentage of replacements caused by fatal failures.

  19. Seismic analyses of equipment in 2736-Z complex. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ocoma, E.C.

    1995-04-01

    This report documents the structural qualification for the existing equipment when subjected to seismic loading in the Plutonium Storage Complex. It replaces in entirety Revision 0 and reconciles the U.S. Department of Energy (DOE) comments on Revision 0. The Complex consists of 2736-Z Building (plutonium storage vault), 2736-ZA Building (vault ventilation equipment building), and 2736-ZB Building (shipping/receiving, repackaging activities). The existing equipment structurally qualified in this report are the metal storage racks for 7 inch and lard cans in room 2 of Building 2736-Z; the cubicles, can holders and pedestals in rooms 1, 3, and 4 of Building 2736-Z; themore » ventilation duct including exhaust fans/motors, emergency diesel generator, and HEPA filter housing in Building 2736-ZA; the repackaging glovebox in Building 2736-ZB; and the interface duct between Buildings 2736-Z and 2736-ZA.« less

  20. Mammoth Cave National Park : Green River ferry service life analysis

    DOT National Transportation Integrated Search

    2015-11-09

    The purpose of this study is to assess whether Mammoth Cave National Park should rehabilitate the existing Green River ferry to extend its service life or replace it with a new vessel. The ferry is used to transport cars and light duty equipment acro...

  1. 7 CFR 1710.406 - Eligible activities and investments.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Off Grid Renewable energy systems; (ii) Fuel cells; (3) Demand side management (DSM) investments... meter; (8) Re-lamping to more energy efficient lighting; and (9) Fuel Switching as in: (i) The replacement of existing fuel consuming equipment using a particular fuel with more efficient fuel consuming...

  2. 40 CFR 205.164 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... as defined in § 205.151(a)(3). (e) The provisions of the subpart do not apply to exhaust header pipes... EQUIPMENT NOISE EMISSION CONTROLS Motorcycle Exhaust Systems § 205.164 Applicability. (a) Except as... exhaust system or motorcycle replacement exhaust system component which: (1) Meets the definition of the...

  3. The Elitism Dispositif: Hierarchization, Discourses of Excellence and Organizational Change in European Economics

    ERIC Educational Resources Information Center

    Maesse, Jens

    2017-01-01

    From the 1990s onwards, economics departments in Europe have changed toward a culture of "excellence." Strong academic hierarchies and new forms of academic organization replace "institutes" and "colleges" by fully equipped "economics departments." This article seeks to demonstrate how and why…

  4. The Camp Caretaker: A Hidden Treasure.

    ERIC Educational Resources Information Center

    Ezersky, Eugene M.

    1996-01-01

    At a round-table discussion, five camp caretakers identified common camp maintenance problems. Snow loads, wooden floors, storage of lake equipment, removal of grass cuttings and leaves, local suppliers, vandalism and trespassing, swimming pools, assigning work, use of outside contractors, decisions to replace or repair, job satisfaction, and…

  5. 44 CFR 206.119 - Financial assistance to address other needs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; and (iii) Repair or replacement of medical equipment. (4) Funeral expenses. Funeral expenses are... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Financial assistance to address other needs. 206.119 Section 206.119 Emergency Management and Assistance FEDERAL EMERGENCY...

  6. 44 CFR 206.119 - Financial assistance to address other needs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; and (iii) Repair or replacement of medical equipment. (4) Funeral expenses. Funeral expenses are... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Financial assistance to address other needs. 206.119 Section 206.119 Emergency Management and Assistance FEDERAL EMERGENCY...

  7. REPLACEMENT OF HAZARDOUS MATERIAL IN WIDE WEB FLEXOGRAPHIC PRINTING PROCESS

    EPA Science Inventory

    This study examined on a technical and economic basis, the effect of substituting water-based inks in a flexographic printing process. o reduce volatile organic compound (VOC) emissions by switching from the use of solvent-based inks to water based inks, several equipment modific...

  8. REPLACEMENT OF HAZARDOUS MATERIAL IN WIDE WEB FLEXOGRAPHIC PRINTING PROCESS

    EPA Science Inventory

    This study examined on a technical and economic basis, the effect of substituting water-based inks in a flexographic printing process. To reduce volatile organic compound (VOC) emissions by switching from the use of solvent-based inks to water based inks, several equipment modifi...

  9. Refrigeration Controls: Electrical & Mechanical; Appliance Repair 3: 9027.02.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    This booklet outlines a course designed to equip major appliance service students with the fundamental knowledge and understanding of procedures, basic electrical circuitry, and nomenclatures of components necessary in successfully tracing a circuit and repairing or replacing a malfunctioning component. Course content includes goals, specific…

  10. 15 CFR 752.2 - Eligible activities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Service activities. Exporting items subject to the EAR as spare and replacement parts for servicing or stocking. (2) End-user activities. Exporting and reexporting items subject to the EAR for use as capital equipment. (3) Distribution activities. Exporting and reexporting items subject to the EAR for the purpose...

  11. 15 CFR 752.2 - Eligible activities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Service activities. Exporting items subject to the EAR as spare and replacement parts for servicing or stocking. (2) End-user activities. Exporting and reexporting items subject to the EAR for use as capital equipment. (3) Distribution activities. Exporting and reexporting items subject to the EAR for the purpose...

  12. 15 CFR 752.2 - Eligible activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Service activities. Exporting items subject to the EAR as spare and replacement parts for servicing or stocking. (2) End-user activities. Exporting and reexporting items subject to the EAR for use as capital equipment. (3) Distribution activities. Exporting and reexporting items subject to the EAR for the purpose...

  13. 15 CFR 752.2 - Eligible activities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Service activities. Exporting items subject to the EAR as spare and replacement parts for servicing or stocking. (2) End-user activities. Exporting and reexporting items subject to the EAR for use as capital equipment. (3) Distribution activities. Exporting and reexporting items subject to the EAR for the purpose...

  14. 15 CFR 752.2 - Eligible activities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Service activities. Exporting items subject to the EAR as spare and replacement parts for servicing or stocking. (2) End-user activities. Exporting and reexporting items subject to the EAR for use as capital equipment. (3) Distribution activities. Exporting and reexporting items subject to the EAR for the purpose...

  15. 78 FR 18535 - Respirator Certification Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ...) proposes to revise the fee structure currently used by the National Institute for Occupational Safety and... performance through product quality audits; (10) replacing testing equipment; and (11) providing and... structure for certifying respirators were codified by HHS in 42 CFR part 84, which was published in June of...

  16. Effects of Particle Filters and Accelerated Engine Replacement on Heavy-Duty Diesel Vehicle Emissions of Black Carbon, Nitrogen Oxides, and Ultrafine Particles

    NASA Astrophysics Data System (ADS)

    Kirchstetter, T.; Preble, C.; Dallmann, T. R.; DeMartini, S. J.; Tang, N. W.; Kreisberg, N. M.; Hering, S. V.; Harley, R. A.

    2013-12-01

    Diesel particle filters have become widely used in the United States since the introduction in 2007 of a more stringent exhaust particulate matter emission standard for new heavy-duty diesel vehicle engines. California has instituted additional regulations requiring retrofit or replacement of older in-use engines to accelerate emission reductions and air quality improvements. This presentation summarizes pollutant emission changes measured over several field campaigns at the Port of Oakland in the San Francisco Bay Area associated with diesel particulate filter use and accelerated modernization of the heavy-duty truck fleet. Pollutants in the exhaust plumes of hundreds of heavy-duty trucks en route to the Port were measured in 2009, 2010, 2011, and 2013. Ultrafine particle number, black carbon (BC), nitrogen oxides (NOx), and nitrogen dioxide (NO2) concentrations were measured at a frequency ≤ 1 Hz and normalized to measured carbon dioxide concentrations to quantify fuel-based emission factors (grams of pollutant emitted per kilogram of diesel consumed). The size distribution of particles in truck exhaust plumes was also measured at 1 Hz. In the two most recent campaigns, emissions were linked on a truck-by-truck basis to installed emission control equipment via the matching of transcribed license plates to a Port truck database. Accelerated replacement of older engines with newer engines and retrofit of trucks with diesel particle filters reduced fleet-average emissions of BC and NOx. Preliminary results from the two most recent field campaigns indicate that trucks without diesel particle filters emit 4 times more BC than filter-equipped trucks. Diesel particle filters increase emissions of NO2, however, and filter-equipped trucks have NO2/NOx ratios that are 4 to 7 times greater than trucks without filters. Preliminary findings related to particle size distribution indicate that (a) most trucks emitted particles characterized by a single mode of approximately 100 nm in diameter and (b) new trucks originally equipped with diesel particle filters were 5 to 6 times more likely than filter-retrofitted trucks and trucks without filters to emit particles characterized by a single mode in the range of 10 to 30 nm in diameter.

  17. Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

    NASA Technical Reports Server (NTRS)

    Chakrabarti, Suman

    2010-01-01

    The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

  18. 76 FR 5144 - Notice of Intent To Prepare an Environmental Impact Statement for U.S. Navy F-35C West Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ...) aircraft on the West Coast of the United States. Under this proposal, a total of seven active-duty F/A-18C... one-for-one replacement. The aging FA-18C Hornet aircraft are expected to be replaced with F-35C..., Southwest; 619-532-2799. SUPPLEMENTARY INFORMATION: As a replacement for the Navy's aging F/A- 18C Hornet...

  19. Primary Total Knee Replacement: Is Suction a Portal of Infection?

    PubMed Central

    Budnar, Vijaya M; Amirfeyz, Rouin; Ng, Michael; Bannister, Gordon C; Blom, Ashley W

    2009-01-01

    INTRODUCTION Pulsed lavage during a total knee replacement usually leaves a pool of fluid on the surgical drapes. It is common practice to suck away this fluid using the same suction device used intra-operatively. This could be a cause of direct wound contamination. We hypothesised that bacteria contaminate fluid that collects around the foot in total knee replacement surgery and that suction equipment could be a portal of contamination. We also hypothesised that bacterial count in the fluid is lower if chlorhexidine, rather than saline, is used in the pulsed lavage. PATIENTS AND METHODS Forty patients undergoing primary total knee replacement were divided into two groups. The first group had pulsed lavage with normal saline and the second with 0.05% chlorhexidine. RESULTS At the end of the operation, 20 ml of fluid, pooled on the surgical drapes was aspirated and cultured for bacterial growth. None of the fluid samples showed bacterial growth. CONCLUSIONS Suction device used peri-operatively during knee replacement is unlikely to be a cause of wound contamination. Pulsed lavage with normal saline is as effective as lavage with chlorhexidine. PMID:19335972

  20. Robots Are Taking Over--Who Does What.

    ERIC Educational Resources Information Center

    Garrison, H. Don

    Robots are machines designed to replace human labor. A fear of vast unemployment due to robots seems unfounded, however, since industrialization creates many more jobs and automation requires technologists to build, program, maintain, and operate sophisticated equipment. Robots possess an intelligence unit, a manipulator, and an end effector.…

  1. 21 CFR 1250.89 - Swimming pools.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... equipped so as to provide complete circulation, replacement, and filtration of the water in the pool every six hours or less. Suitable means of chlorination and, if necessary, other treatment of the water shall be provided to maintain the residual chlorine in the pool water at not less than 0.4 part per...

  2. 21 CFR 1250.89 - Swimming pools.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... equipped so as to provide complete circulation, replacement, and filtration of the water in the pool every six hours or less. Suitable means of chlorination and, if necessary, other treatment of the water shall be provided to maintain the residual chlorine in the pool water at not less than 0.4 part per...

  3. Evaluation of organic matter addition and incorporation on steep cut slopes : phase I, literature review and potential applicable equipment evaluation.

    DOT National Transportation Integrated Search

    2003-08-01

    Erosion of steep highway cut slopes in Montana is the consequence of poor vegetation development in : nutrient-poor growth media resulting from highway construction where topsoil cannot physically be : replaced due to slope steepness. A literature re...

  4. 7 CFR 1783.12 - What are eligible uses of grant proceeds?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE (CONTINUED) REVOLVING FUNDS FOR FINANCING WATER AND WASTEWATER PROJECTS... projects or with existing water and wastewater systems, and (2) Short-term costs incurred for replacement equipment, small-scale extension of services, or other small capital projects that are not part of the...

  5. 49 CFR 234.273 - Results of inspections and tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Results of inspections and tests. 234.273 Section....273 Results of inspections and tests. (a) Results of inspections and tests made in compliance with.../DOT inventory number, place and date, equipment tested, results of tests, repairs, replacements...

  6. 49 CFR 234.273 - Results of inspections and tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Results of inspections and tests. 234.273 Section....273 Results of inspections and tests. (a) Results of inspections and tests made in compliance with.../DOT inventory number, place and date, equipment tested, results of tests, repairs, replacements...

  7. 49 CFR 234.273 - Results of inspections and tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Results of inspections and tests. 234.273 Section....273 Results of inspections and tests. (a) Results of inspections and tests made in compliance with.../DOT inventory number, place and date, equipment tested, results of tests, repairs, replacements...

  8. 40 CFR 61.184 - Ambient air monitoring for inorganic arsenic.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reasonable time allowance for instrument maintenance and calibration, for changing filters, or for replacement of equipment needing major repair. (e) Filters shall be changed daily and shall be analyzed and concentrations calculated within 30 days after filters are collected. (f) The Administrator at any time may...

  9. 40 CFR 61.184 - Ambient air monitoring for inorganic arsenic.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reasonable time allowance for instrument maintenance and calibration, for changing filters, or for replacement of equipment needing major repair. (e) Filters shall be changed daily and shall be analyzed and concentrations calculated within 30 days after filters are collected. (f) The Administrator at any time may...

  10. 29 CFR 1926.1414 - Wire rope-selection and installation criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Wire rope-selection and installation criteria. 1926.1414... Derricks in Construction § 1926.1414 Wire rope—selection and installation criteria. (a) Original equipment wire rope and replacement wire rope must be selected and installed in accordance with the requirements...

  11. 78 FR 24985 - Airworthiness Directives; Cessna Aircraft Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... (L-126A,B,C), 195A, and 195B airplanes that are equipped with certain inboard aileron hinge brackets... 4, 2013), currently requires you to repetitively inspect the affected inboard aileron hinge brackets... brackets. Replacement with aluminum brackets would terminate the need for the repetitive inspections...

  12. BRIQUETTES FROM AGRICULTURAL RESIDUE AND OTHER WASTES FOR USE IN BIOMASS SYNGAS FUELED POWER GENERATION

    EPA Science Inventory

    The complete project will greatly increase the sustainability of small gasoline and/or diesel powered generators that are currently used to supplement or replace an unreliable power grid. This phase will develop the feedstock processing equipment needed to produce syngas bio-...

  13. Notions of Technology and Visual Literacy

    ERIC Educational Resources Information Center

    Stankiewicz, Mary Ann

    2004-01-01

    For many art educators, the word "technology" conjures up visions of overhead projectors and VCRs, video and digital cameras, computers equipped with graphic programs and presentation software, digital labs where images rendered in pixels replace the debris of charcoal dust and puddled paints. One forgets that visual literacy and technology have…

  14. Digital Audio Sampling for Film and Video.

    ERIC Educational Resources Information Center

    Stanton, Michael J.

    Digital audio sampling is explained, and some of its implications in digital sound applications are discussed. Digital sound equipment is rapidly replacing analog recording devices as the state-of-the-art in audio technology. The philosophy of digital recording involves doing away with the continuously variable analog waveforms and turning the…

  15. 76 FR 63571 - Airworthiness Directives; Eclipse Aerospace, Inc. Airplanes Equipped With Pratt & Whitney Canada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... design change for the combustion chamber liner assembly. This proposed AD would retain the requirements... design change to the combustion chamber liner assembly. The current design of the combustion chamber liner assembly is a one- piece configuration. The new design change involves replacing the combustion...

  16. 77 FR 14989 - Medicare Program; Revisions to the Durable Medical Equipment, Prosthetics, Orthotics, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... wheelchairs. Prosthetic devices are included in the definition of ``medical and other health services'' in section 1861(s)(8) of the Act. Prosthetic devices are defined as devices (other than dental) which replace... examples of prosthetic devices include cardiac pacemakers, cochlear implants, electrical continence aids...

  17. Alternative Fuels Data Center

    Science.gov Websites

    Clean School Bus Program Any school district or charter school may receive a grant through the Texas Commission on Environmental Quality (TCEQ) to pay for the incremental costs to replace school equipment, and other emissions reduction technologies in qualified school buses. Furthermore, funds may also

  18. 41 CFR 109-38.403-2 - Responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., including vandalism, theft and parking lot damage to a DOE vehicle which occurs during the period that the vehicle is assigned to an employee of that organization. The charges recovered by the designated..., AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.4-Use and Replacement Standards § 109-38.403-2...

  19. 1. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST, FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXTUAL VIEW OF BRIDGE IN SETTING, LOOKING SOUTHWEST, FROM DOWNSTREAM. Crew, vehicles, boats, and equipment are from the California Department of Transportation's Transportation Laboratory conducting test borings for the replacement bridge. - Smith River Bridge, CA State Highway 199 Spanning Smith River, Crescent City, Del Norte County, CA

  20. 49 CFR 577.5 - Notification pursuant to a manufacturer's decision.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., the difference between the performance of the noncomplying vehicle or item of replacement equipment and the performance specified by the standard; (3) A statement of any operating or other conditions... remedy tires without charge. (iii) In the case of remedy by repair through the manufacturer's dealers or...

  1. 40 CFR 60.676 - Reporting and recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... elevator, bagging operation, or enclosed truck or railcar loading station: (i) The rated capacity in... following such change. At the time of such change, this screening operation, bucket elevator, or belt... hour of the replacement equipment. (2) For a screening operation: (i) The total surface area of the top...

  2. 40 CFR 60.676 - Reporting and recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... elevator, bagging operation, or enclosed truck or railcar loading station: (i) The rated capacity in... following such change. At the time of such change, this screening operation, bucket elevator, or belt... hour of the replacement equipment. (2) For a screening operation: (i) The total surface area of the top...

  3. 40 CFR 60.676 - Reporting and recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... elevator, bagging operation, or enclosed truck or railcar loading station: (i) The rated capacity in... following such change. At the time of such change, this screening operation, bucket elevator, or belt... hour of the replacement equipment. (2) For a screening operation: (i) The total surface area of the top...

  4. 40 CFR 60.676 - Reporting and recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... elevator, bagging operation, or enclosed truck or railcar loading station: (i) The rated capacity in... following such change. At the time of such change, this screening operation, bucket elevator, or belt... hour of the replacement equipment. (2) For a screening operation: (i) The total surface area of the top...

  5. 46 CFR 91.25-20 - Fire extinguishing equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... smothering lines shall be checked with at least a 50 p.s.i. air pressure with the ends capped or by blowing... water or antifreeze. Cartridge operated (water, antifreeze or loaded stream) Examine pressure cartridge... Dry chemical (cartridge-operated type) Examine pressure cartridge and replace if end is punctured or...

  6. KSC-08pd2355

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers lift the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover before attaching a crane. The cover will be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  7. KSC-08pd2356

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover to be installed on the Orbital Replacement Unit Carrier, or ORUC, below. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  8. The management of ultrasound equipment at Sheffield Teaching Hospitals NHS Foundation Trust

    PubMed Central

    Peacock, M

    2013-01-01

    Management of ultrasound equipment at Sheffield Teaching Hospitals NHS Foundation Trust is described. The organisation and input of various stakeholders and their involvement with ultrasound equipment management and scientific ultrasound is discussed. Two important stakeholders are the Medical Equipment Management Group and the Radiation Safety Steering Committee. The Medical Equipment Management Group has a specific sub-group, the Ultrasound sub-group, and its role is to coordinate the purchase, replacement and quality assurance of ultrasound equipment in the Trust. The Radiation Safety Steering Committee has a non-ionising radiation representative and the role of this committee is to provide corporate assurance that any health and safety issues arising from the use of radiation to either patients, members of the public or staff within the Trust are being effectively managed. The Ultrasound sub-group of the Medical Equipment Management Group has successfully brought together management of all ultrasound equipment within the Trust and is in the process of fulfilling the quality assurance and training milestones set out by the Medical Equipment Management Group. Advice from the Radiation Safety Steering Committee has helped to increase awareness of ultrasound safety and good scanning practice, especially in the case of neonatal ultrasound imaging, within the Trust. In addition, the RSSC has given advice on clinical pathways for patients undergoing ionising radiation imaging while being treated by extra-corporeal shockwave lithotripsy. PMID:27433195

  9. STS-103 crew take part in CEIT

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Hazardous Servicing Facility, the STS-103 crew look over equipment to be used during their mission. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Frangois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  10. KSC-99pp1086

    NASA Image and Video Library

    1999-09-02

    In the Payload Hazardous Servicing Facility, the STS-103 crew look over equipment to be used during their mission. The seven-member crew, taking part in a Crew Equipment Interface Test, are Commander Curtis L. Brown Jr., Pilot Scott J. Kelly, and Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-François Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a "call-up" due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review

  11. Noise test system of rotating machinery in nuclear power station based on microphone array

    NASA Astrophysics Data System (ADS)

    Chang, Xincai; Guan, Jishi; Qi, Liangcai

    2017-12-01

    Rotating machinery plays an important role in all walks of life. Once the equipment fails, equipment maintenance and shutdown will cause great social harm and economic losses. Equipment safety operations at nuclear power stations have always been of top priority. It is prone to noise when the equipment is out of order or aging. Failure to find or develop equipment at the initial stage of equipment failure or ageing will pose a serious threat to the safety of the plant’s equipment. In this paper, sound imaging diagnosis technology is applied as a supplementary method to the condition monitoring and diagnosis system of rotating machinery in nuclear power stations. It provides a powerful guarantee for the condition monitoring and fault diagnosis of rotating machinery in nuclear power stations.

  12. OppoRTUnities Abound

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deru, Michael

    According to the U.S. Energy Information Administration, HVAC accounts for approximately 38 percent of U.S. commercial buildings' primary energy consumption and a slightly higher percentage of their greenhouse-gas emissions. We have seen incredible gains made with lighting, going from incandescent and T12 fluorescent bulbs to high-efficiency LEDS, but there are even greater advances to be made with HVAC. Gains of 20 percent to 30 percent easily can be made by replacing older degraded equipment with new high-efficiency equipment. Even more savings are possible with an integrated engineering approach yielding optimized system designs combined with highly efficient controls.

  13. System Mean-Time-between-Failure versus Life-Cycle Logistics Cost Subject to the Introduction of Line-Replaceable-Unit Redundancy

    DTIC Science & Technology

    1988-03-18

    Design Confiquration 6 ......... 805 Appendix 9 SCRAPIRONS’s Output For Design Confiquration 7 ......... 90 Appendix 10 SCRAPIRONS’s Output For fesign ...17umb~r of men per contact support crew 2.00e0j _______ TVRO IV test equipment). 293 Name-285) TRC D~own-time in hours per service demanda4 equipment...to service for servicing further _____LUs. 297 14iaeeC28F) T~mE used in concepts GM. GO. and CR which 84.rje1 cal;.for LRU and: mtue ear atGeneral S

  14. Optimum random and age replacement policies for customer-demand multi-state system reliability under imperfect maintenance

    NASA Astrophysics Data System (ADS)

    Chen, Yen-Luan; Chang, Chin-Chih; Sheu, Dwan-Fang

    2016-04-01

    This paper proposes the generalised random and age replacement policies for a multi-state system composed of multi-state elements. The degradation of the multi-state element is assumed to follow the non-homogeneous continuous time Markov process which is a continuous time and discrete state process. A recursive approach is presented to efficiently compute the time-dependent state probability distribution of the multi-state element. The state and performance distribution of the entire multi-state system is evaluated via the combination of the stochastic process and the Lz-transform method. The concept of customer-centred reliability measure is developed based on the system performance and the customer demand. We develop the random and age replacement policies for an aging multi-state system subject to imperfect maintenance in a failure (or unacceptable) state. For each policy, the optimum replacement schedule which minimises the mean cost rate is derived analytically and discussed numerically.

  15. Performance of equipment used in high-pressure steam floods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, M.E.; Bramley, B.G.

    1966-01-01

    Recovery of low-gravity, high-viscosity crude oil from relatively shallow reservoirs is becoming feasible through the application of steam flooding. Pan American Petroleum Corp. initiated a pilot steam flood with a 5.36 million btu/hr, 1,500-psi steam generator at the Winkleman Dome Field in West Central Wyoming in March, 1964. After 1 yr of operation, this steamer was replaced with a larger unit capable of 12 million-btu/hr, 2,500-psi steam generators, one at the Salt Creek Shannon Field and another at the Fourbear Field, both in Wyoming. This paper discusses the equipment used in high-pressure steam flooding and reviews some of the problemsmore » that have been encountered in the application of the equipment. Where determined, a suggested solution is presented.« less

  16. Low excess air burners keep boiler and air cleaner while cutting fuel costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, H.

    1981-11-01

    In the 1970s at the Humko Chemical Co., producers of fatty acids used in plastics, soaps, rubber products, and textiles, it was deemed necessary to modify existing boiler equipment to insure an adequate fuel supply and to increase efficienct. Existing equipment operated at an overall average efficiency of 77% and only 6% excess O/sub 2/ could be achieved with number 6 fuel oil and only 2.6% with natural gas. Cleaning the boilers and replacing existing burners with oil and gas firing units led to overall efficiency up to 84% with only 1% excess O/sub 2/. Even though fuel costs havemore » approximately tripled during the ensuing time, Humko's cost of producing steam has only doubled with the more efficienct equipment. (BLM)« less

  17. E-waste management and sustainability: a case study in Brazil.

    PubMed

    Azevedo, Luís Peres; da Silva Araújo, Fernando Gabriel; Lagarinhos, Carlos Alberto Ferreira; Tenório, Jorge Alberto Soares; Espinosa, Denise Crocce Romano

    2017-11-01

    The advancement of technology and development of new electronic and electrical equipment with a reduced life cycle has increased the need for the disposal of them (called Waste of Electric and Electronic Equipment or simply e-waste) due to defects presented during use, replacement of obsolete equipment, and ease of acquisition of new equipment. There is a lack of consumer awareness regarding the use, handling storage, and disposal of this equipment. In Brazil, the disposal of post-consumer waste is regulated by the National Solid Waste Policy, established by Law No. 12305 and regulated on the 23rd December 2010. Under this legislation, manufacturers and importers are required to perform a project for the Reverse Logistics of e-waste, though its implementation is not well defined. This work focuses on the verification of the sustainability of reverse logistics suggested by the legislation and the mandatory points, evaluating its costs and the possible financial gain with recycling of the waste. The management of reverse logistics and recycling of waste electrical and electronic equipment, or simply recycling of e-waste, as suggested by the government, will be the responsibility of the managing organization to be formed by the manufacturers/importers in Brazil.

  18. Far-field Wireless Energy Harvesting for Increased Safeguards Equipment Battery Life.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hymel, Ross W.

    Modern unattended safeguards equipment (e.g. seals) incorporates many low-power electronic circuits, which are typically powered by expensive and toxic lithium thionyl chloride (LiSOCL2) batteries. The limited life of these batteries necessitates their periodic replacement. This replacement must be performed before total battery discharge to avoid potential loss of continuity of knowledge. Thus, the effective battery capacity becomes significantly less than the actual usable capacity. Additionally, such maintenance is a radiological hazard to personnel, as well as a monetary burden to a safeguards inspectorate. Energy harvesting, a commercially available technology, could extend the operational life of batterypowered equipment to achieve significantmore » efficiencies for safeguards deployments. Energy harvesting is the scavenging and storage of ambient energy sources, such as solar, thermal, and kinetic for use in lowpower electronic applications. While the amount of scavenged energy per unit time may be small, it most often comes from a source that will not be depleted throughout the deployment of the harvesting device. The best-known energy harvesters are solar panels and wind turbines. Recently, far-field wireless energy harvesting has become a commercially available option. Far-field wireless energy harvesting provides consistent, predictable, and un-tethered power over distances up to 50 feet. This process converts radio frequency (RF) energy, both intentionally emitted and ambient, into usable direct current (DC) power. Incorporating far-field wireless energy harvesting into safeguards equipment can significantly extend the equipment’s battery life and perhaps make it indefinite. Furthermore, additional functionality can be added to safeguards equipment without lowering its operational life expectancy. This paper explores the benefits and drawbacks of integrating far-field wireless energy harvesting into a chosen safeguards seal: the Remotely Monitored Sealing Array (RMSA). Specifically, it examines the performance of a commercially available RF harvesting system from Powercast, as well as commercial and custom antenna solutions.« less

  19. Advancing the Oxygen Generation Assembly Design to Increase Reliability and Reduce Costs for a Future Long Duration Mission

    NASA Technical Reports Server (NTRS)

    Takada, Kevin C.; Ghariani, Ahmed E.; Van Keuren,

    2015-01-01

    The state-of-the-art Oxygen Generation Assembly (OGA) has been reliably producing breathing oxygen for the crew aboard the International Space Station (ISS) for over eight years. Lessons learned from operating the ISS OGA have led to proposing incremental improvements to advance the baseline design for use in a future long duration mission. These improvements are intended to reduce system weight, crew maintenance time and resupply mass from Earth while increasing reliability. The proposed improvements include replacing the cell stack membrane material, deleting the nitrogen purge equipment, replacing the hydrogen sensors, deleting the wastewater interface, replacing the hydrogen dome and redesigning the cell stack power supply. The development work to date will be discussed and forward work will be outlined. Additionally, a redesigned system architecture will be proposed.

  20. 46 CFR 131.575 - Yearly inspections and repair.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... repaired as needed at least once a year. This procedure includes emptying and cleaning each fuel tank and refilling it with fresh fuel. (b) Each davit, winch, fall, and other launching-appliance must be thoroughly... battery used in an item of survival equipment and clearly marked with an expiration date must be replaced...

  1. 33 CFR 150.514 - What are the annual tests and inspections?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... boat, and liferaft. At that time, the operator must also empty, clean, and refill each fuel tank with fresh fuel; (b) Thoroughly inspect and, if needed, repair each davit, winch, fall, and other launching... that has passed; (d) Check all lifesaving equipment batteries and replace any battery that is marked...

  2. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  3. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  4. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  5. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  6. Joint Venture Health Plans May Give ACOs a Run for Their Money.

    PubMed

    Reinke, Thomas

    2016-12-01

    Joint venture plans are starting to demonstrate their ability to implement clinical management and financial management reforms. A JV health plan replaces the offloading of financial risk by health plans to ill-equipped providers with an executive-level cost management committee stated jointly by the hospital and payer.

  7. 21 CFR 514.8 - Supplements and other changes to an approved application.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the drug as manufactured without the change; (C) Changes that may affect drug substance or drug... the proposed change; (C) The drug(s) involved; (D) The manufacturing site(s) or area(s) affected; (E...) Replacement of equipment with that of a different design that does not affect the process methodology or...

  8. 21 CFR 514.8 - Supplements and other changes to an approved application.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the drug as manufactured without the change; (C) Changes that may affect drug substance or drug... the proposed change; (C) The drug(s) involved; (D) The manufacturing site(s) or area(s) affected; (E...) Replacement of equipment with that of a different design that does not affect the process methodology or...

  9. Installation-Wide Energy Conservation Demonstration at Fort McClellan, Alabama

    DTIC Science & Technology

    1988-11-01

    Inefficient Electrical Motors 12 Dispensary Chiller Installation 12 Combustion Optimization of Gas-fired Heating Equipment 12 Infiltration Study of Family... Chiller Installation 34 5 FAMILY HOUSING .................................................... 37 Combustion Optimization of Gas-fired Heating...in Outdoor Air Ventilation 59 Replacement of Inefficient Electric Motors 59 Dispensary Chiller Installation 60 Combustion Optimization of Gas-fired

  10. 46 CFR 193.10-90 - Installations contracted for prior to March 1, 1968.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... service so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection. Minor repairs, alterations, and replacements may be permitted to the same standards as...) OCEANOGRAPHIC RESEARCH VESSELS FIRE PROTECTION EQUIPMENT Fire Main System, Details § 193.10-90 Installations...

  11. 40 CFR 122.29 - New sources and new dischargers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pollution treatment for the source. (b) Criteria for new source determination. (1) Except as otherwise... located; or (ii) It totally replaces the process or production equipment that causes the discharge of... plant; and the extent to which the new facility is engaged in the same general type of activity as the...

  12. 40 CFR 122.29 - New sources and new dischargers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pollution treatment for the source. (b) Criteria for new source determination. (1) Except as otherwise... located; or (ii) It totally replaces the process or production equipment that causes the discharge of... plant; and the extent to which the new facility is engaged in the same general type of activity as the...

  13. 40 CFR 122.29 - New sources and new dischargers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pollution treatment for the source. (b) Criteria for new source determination. (1) Except as otherwise... located; or (ii) It totally replaces the process or production equipment that causes the discharge of... plant; and the extent to which the new facility is engaged in the same general type of activity as the...

  14. 40 CFR 122.29 - New sources and new dischargers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pollution treatment for the source. (b) Criteria for new source determination. (1) Except as otherwise... located; or (ii) It totally replaces the process or production equipment that causes the discharge of... plant; and the extent to which the new facility is engaged in the same general type of activity as the...

  15. 21 CFR 509.15 - Use of polychlorinated biphenyls (PCB's) in establishments manufacturing food-packaging materials.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...-packaging materials shall: (i) Have the heat exchange fluid used in existing equipment for manufacturing... manufacturing practices be replaced with a heat exchange fluid that does not contain PCB's. (ii) Eliminate to... (Japan). PCB's are highly stable, heat resistant, and nonflammable chemicals. Industrial uses of PCB's...

  16. 21 CFR 509.15 - Use of polychlorinated biphenyls (PCB's) in establishments manufacturing food-packaging materials.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...-packaging materials shall: (i) Have the heat exchange fluid used in existing equipment for manufacturing... manufacturing practices be replaced with a heat exchange fluid that does not contain PCB's. (ii) Eliminate to... (Japan). PCB's are highly stable, heat resistant, and nonflammable chemicals. Industrial uses of PCB's...

  17. 21 CFR 109.15 - Use of polychlorinated biphenyls (PCB's) in establishments manufacturing food-packaging materials.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...-packaging materials shall: (i) Have the heat exchange fluid used in existing equipment for manufacturing... manufacturing practices be replaced with a heat exchange fluid that does not contain PCB's. (ii) Eliminate to... (Japan). PCB's are highly stable, heat resistant, and nonflammable chemicals. Industrial uses of PCB's...

  18. 21 CFR 109.15 - Use of polychlorinated biphenyls (PCB's) in establishments manufacturing food-packaging materials.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...-packaging materials shall: (i) Have the heat exchange fluid used in existing equipment for manufacturing... manufacturing practices be replaced with a heat exchange fluid that does not contain PCB's. (ii) Eliminate to... (Japan). PCB's are highly stable, heat resistant, and nonflammable chemicals. Industrial uses of PCB's...

  19. 26 CFR 1.162-3 - Materials and supplies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... interchangeable in other machines or equipment; (ix) [Reserved] (x) Not acquired in quantity (generally only one... break down or wear out. These rotable parts are removable from the vehicles and are repaired so that... to replace similar parts in C's vehicles as those parts break down or wear out. These rotable parts...

  20. Substituting Developmental for Traditional Games in Elementary Physical Education

    ERIC Educational Resources Information Center

    Belka, David

    2004-01-01

    When children are assessed as being developmentally ready for competitive game play, large group games and traditional low organizational games need to be replaced by an approach that uses small-sided games, modified equipment and playing areas, and emphasizes game tactics. Manipulating factors that affect the structure and understanding of games…

  1. 40 CFR 86.1434 - Equipment preparation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New Gasoline-Fueled Otto-Cycle Light-Duty Vehicles and New Gasoline-Fueled Otto-Cycle Light-Duty... the device(s) for removing water from the exhaust sample and the sample filter(s). Remove any water from the water trap(s). Clean and replace the filter(s) as necessary. (c) Set the zero and span points...

  2. 40 CFR 86.1434 - Equipment preparation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... New Gasoline-Fueled Otto-Cycle Light-Duty Vehicles and New Gasoline-Fueled Otto-Cycle Light-Duty... the device(s) for removing water from the exhaust sample and the sample filter(s). Remove any water from the water trap(s). Clean and replace the filter(s) as necessary. (c) Set the zero and span points...

  3. 40 CFR 86.1434 - Equipment preparation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... New Gasoline-Fueled Otto-Cycle Light-Duty Vehicles and New Gasoline-Fueled Otto-Cycle Light-Duty... the device(s) for removing water from the exhaust sample and the sample filter(s). Remove any water from the water trap(s). Clean and replace the filter(s) as necessary. (c) Set the zero and span points...

  4. 40 CFR 86.1434 - Equipment preparation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... New Gasoline-Fueled Otto-Cycle Light-Duty Vehicles and New Gasoline-Fueled Otto-Cycle Light-Duty... the device(s) for removing water from the exhaust sample and the sample filter(s). Remove any water from the water trap(s). Clean and replace the filter(s) as necessary. (c) Set the zero and span points...

  5. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  6. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  7. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  8. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  9. 40 CFR 1054.620 - What are the provisions for exempting engines used solely for competition?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment built on or after January 1, 2010. (a) We may grant you an exemption from the standards and... competition teams, professional competitors, or other qualified competitors. For replacement engines, the sale of the engine itself must be limited to professional racing teams, professional racers, other...

  10. A New Approach to the Numerical Evaluation of the Inverse Radon Transform with Discrete, Noisy Data.

    DTIC Science & Technology

    1980-07-01

    spline form. The resulting analytic expression for the inner integral in the inverse transform is then readily evaluated, and the outer (periodic...integral is replaced by a sum. The work involved to obtain the inverse transform appears to be within the capability of existing computing equipment for

  11. Microencapsulation of Drugs in the Microgravity Environment of the United States Space Shuttle.

    DTIC Science & Technology

    Space Shuttle. The microcapsules in space (MIS) equipment will replace two space shuttle middeck storage lockers. Design changes have been...Mission STS-53 pending final safety certification by NASA. STS-53 is scheduled for launch on October 15, 1992. RA 2; Microencapsulation ; Controlled-release; Space Shuttle; Antibiotics; Drug development.

  12. The Robots Are Coming! Training Tomorrow's High-Tech Workers.

    ERIC Educational Resources Information Center

    Zemke, Ron

    1983-01-01

    The United States, running second to Japan in the robot race, is employing 19 percent of the world's robots. This article presents six classes of robots that were defined by the Japanese trade association. All are multifunctional, equipped with a memory device, capable of rotation, and able to replace human workers. (SSH)

  13. Multiple Learning Strategies Project. Small Engine Repair Service. [Regular Vocational. Vol. 2.

    ERIC Educational Resources Information Center

    Pitts, Jim; And Others

    This instructional package is one of two designed for use by regular vocational students in the vocational area of small engine repair service. Contained in this document are forty-nine learning modules organized into eleven units: test equipment; motorcycle; engine removal and replacement; machining; tune-ups; short blocks; storage; filling out…

  14. 78 FR 10686 - Notice of Receipt of Petition for Decision That Nonconforming Long-Wheel Base 2005 Mercedes-Benz...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ...; 124 Accelerator Control Systems; 201 Occupant Protection in Interior Impact; 202 Head Restraints; 204... systems. Standard No. 108 Lamps, Reflective Devices and Associated Equipment: Installation of U.S.- model headlamps and front and rear side marker lamps. Standard No. 111 Rearview Mirrors: Replacement of the...

  15. 75 FR 36150 - Reports, Forms and Record Keeping Requirements; Agency Information Collection Activity Under OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ..., National Highway Traffic Safety Administration, Office of Vehicle Safety Compliance (NVS-223), 1200 New.... Affected Public: Business or other for-profit organizations. Abstract: If a motor vehicle or item of replacement motor vehicle equipment contains a defect related to motor vehicle safety or fails to comply with...

  16. 46 CFR 71.25-20 - Fire detecting and extinguishing equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... shall be checked with at least a 50 p.s.i. air pressure with the ends capped or by blowing steam through... water or antifreeze. Cartridge operated (water, antifreeze or loaded stream) Examine pressure cartridge... Dry chemical (cartridge-operated type) Examine pressure cartridge and replace if end is punctured or...

  17. 46 CFR 71.25-20 - Fire detecting and extinguishing equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... shall be checked with at least a 50 p.s.i. air pressure with the ends capped or by blowing steam through... water or antifreeze. Cartridge operated (water, antifreeze or loaded stream) Examine pressure cartirdge... Dry chemical (cartridge-operated type) Examine pressure cartridge and replace if end is punctured or...

  18. 46 CFR 71.25-20 - Fire detecting and extinguishing equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... shall be checked with at least a 50 p.s.i. air pressure with the ends capped or by blowing steam through... water or antifreeze. Cartridge operated (water, antifreeze or loaded stream) Examine pressure cartirdge... Dry chemical (cartridge-operated type) Examine pressure cartridge and replace if end is punctured or...

  19. KSC-08pd2088

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center mate the Hubble vertical platform to the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  20. KSC-08pd2098

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center installs a pallet support strut on the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  1. KSC-08pd2097

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center installs a pallet support strut on the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  2. KSC-08pd2089

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center secure the Hubble vertical platform to the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  3. KSC-08pd2096

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center installs a pallet support strut on the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. KSC-08pd2094

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center install the pallet support struts on the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  5. KSC-08pd2087

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center move the Hubble vertical platform toward the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope, to which it will be mated. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  6. KSC-08pd2085

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope, elevated at left, is ready to be mated to the Hubble vertical platform, at right. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  7. KSC-08pd2086

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center move the Hubble vertical platform toward the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope, to which it will be mated. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  8. KSC-08pd2095

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. -- In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center documents the installation of a pallet support strut on the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. SLIC is built with state-of-the-art, lightweight, composite materials - carbon fiber with a cyanate ester resin and a titanium metal matrix composite. These composites have greater strength-to-mass ratios than the metals typically used in spacecraft design. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  9. Technical aspects of home hemodialysis.

    PubMed

    Alhomayeed, B; Lindsay, R M

    2009-03-01

    Home hemodialysis (HHD) has proved to be a useful form of renal replacement therapy. The economic advantage of HHD is well established and interest in it is renewed. Once it has been decided to establish a HHD program, a well developed strategic plan is required. This should address financial and logistical issues and establish policies that will address responsi-bilities of both patients and HD centers. The recruitment of patients is facilitated by ensuring that all incident patients have early access to an education program describing all forms of renal replacement therapy that the regional renal program provides. Patients and members of the pre-dialysis education program should understand the selection process criteria in advance. Once the assessment is completed and the patient agrees to the proceedings, a plan of action should be esta-blished for enrolling the patient into the program and initiating training. Patients' education pro-gram should take into consideration principles of adult learning. When choosing dialysis equip-ment for home use, the needs and preferences of the patients should be respected. As a rule of thumb, the equipment should be simple to use, yet still provide adequate and reliable therapy. De-ciding where to set up and position the HHD equipment is important. Installation of HHD ma-chine at home requires a continuous supply of accessories. Before establishing a HHD program, commitment of the dialysis center to provide and maintain the infrastructure of the program is mandatory. The estimated patients suitable for HHD are less than 15% of all prospective dialysis patients. Generally, those who are have greatly improved quality of life and by using modalities such as nocturnal and daily dialysis can have improved physical well-being with considerable potential cost savings.

  10. Position controlled Knee Rehabilitation Orthotic Device for Patients after Total Knee Replacement Arthroplasty

    NASA Astrophysics Data System (ADS)

    Wannaphan, Patsiri; Chanthasopeephan, Teeranoot

    2016-11-01

    Knee rehabilitation after total knee replacement arthroplasty is essential for patients during their post-surgery recovery period. This study is about designing one degree of freedom knee rehabilitation equipment to assist patients for their post-surgery exercise. The equipment is designed to be used in sitting position with flexion/extension of knee in sagittal plane. The range of knee joint motion is starting from 0 to 90 degrees angle for knee rehabilitation motion. The feature includes adjustable link for different human proportions and the torque feedback control at knee joint during rehabilitation and the control of flexion/extension speed. The motion of the rehabilitation equipment was set to move at low speed (18 degrees/sec) for knee rehabilitation. The rehabilitation link without additional load took one second to move from vertical hanging up to 90° while the corresponding torque increased from 0 Nm to 2 Nm at 90°. When extra load is added, the link took 1.5 seconds to move to 90° The torque is then increased from 0 Nm to 4 Nm. After a period of time, the speed of the motion can be varied. User can adjust the motion to 40 degrees/sec during recovery activity of the knee and users can increase the level of exercise or motion up to 60 degrees/sec to strengthen the muscles during throughout their rehabilitation program depends on each patient. Torque control is included to prevent injury. Patients can use the equipment for home exercise to help reduce the number of hospital visit while the patients can receive an appropriate therapy for their knee recovery program.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anastasia M. Gribik; Ronald E. Mizia; Harry Gatley

    This project addresses both the technical and economic feasibility of replacing industrial gas in lime kilns with synthesis gas from the gasification of hog fuel. The technical assessment includes a materials evaluation, processing equipment needs, and suitability of the heat content of the synthesis gas as a replacement for industrial gas. The economic assessment includes estimations for capital, construction, operating, maintenance, and management costs for the reference plant. To perform these assessments, detailed models of the gasification and lime kiln processes were developed using Aspen Plus. The material and energy balance outputs from the Aspen Plus model were used asmore » inputs to both the material and economic evaluations.« less

  12. MS Linnehan checks airlock hatch on middeck

    NASA Image and Video Library

    2002-03-05

    STS109-E-5602 (5 March 2002) --- Astronaut Richard M. Linnehan, mission specialist, checks the airlock hatch as two crewmates on the other side, equipped with extravehicular mobility units (EMU) space suits, start their extravehicular activity (EVA). On the previous day astronauts Linnehan and John M. Grunsfeld replaced the starboard solar array on the Hubble Space Telescope (HST). This day's space walk went on to see astronauts James H. Newman and Michael J. Massimino replace the port solar array. Grunsfeld's suit, scheduled for two more space walks, is temporarily stowed on the mid deck floor at right. The image was recorded with a digital still camera.

  13. Mid- to long-term outcome comparison of the Medtronic Hancock II and bi-leaflet mechanical aortic valve replacement in patients younger than 60 years of age: a propensity-matched analysis.

    PubMed

    Wang, Yin; Chen, Si; Shi, Jiawei; Li, Geng; Dong, Nianguo

    2016-03-01

    This study aims to compare mid-long-term clinical outcomes between patients younger than 60 years of age undergoing bioprosthetic and mechanical aortic valve replacement. From January 2002 to December 2009, patients younger than 60 years of age who received Medtronic Hancock II porcine bioprostheses were selected and compared with those who received mechanical bi-leaflet valves in the aortic position. A stepwise logistic regression propensity score identified a subset of 112 evenly matched patient-pairs. Mid-long-term outcomes of survival, valve-related reoperations, thromboembolic events and bleeding events were assessed. The follow-up was only 95.1% complete. Fourteen measurable variables were statistically similar for the matched cohort. Postoperative in-hospital mortality was 3.6% (bioprosthetic valves) and 2.7% (mechanical valves) (P = 0.700). Survival at 5 and 10 years was 96.3 and 88.7% for patients receiving bioprosthetic valve replacement versus 96.3 and 87.9% for patients receiving mechanical valve replacement (P = 0.860), respectively. At 5 and 10 years after operations, freedom from valve-related reoperation was 97.2 and 94.8% for patients receiving mechanical valve replacement, and 96.3 and 90.2% for patients receiving bioprosthetic valve replacement (P = 0.296), respectively. There was no difference between freedom from thromboembolic events (P = 0.528) and bleeding events (P = 0.128) between the matched groups during the postoperative 10 years. In patients younger than 60 years of age undergoing aortic valve replacement, mid-long-term survival rate was similar for patients receiving bioprosthetic versus mechanical valve replacement. Bioprosthetic valves were associated with a trend for a lower risk of anticoagulation treatment and did not have significantly greater likelihood of a reoperation. These findings suggest that a bioprosthetic valve may be a reasonable choice for AVR in patients younger than 60 years of age. © The Author 2015. Published by Oxford University Press on behalf of the European Association for Cardio-Thoracic Surgery. All rights reserved.

  14. Emergency department-reported injuries associated with mechanical home exercise equipment in the USA

    PubMed Central

    Graves, Janessa M; Iyer, Krithika R; Willis, Margaret M; Ebel, Beth E; Rivara, Frederick P; Vavilala, Monica S

    2015-01-01

    The goal of this study was to generate national estimates of injuries associated with mechanical home exercise equipment, and to describe these injuries across all ages. Emergency department (ED)-treated injuries associated with mechanical home exercise equipment were identified from 2007 to 2011 from the National Electronic Injury Surveillance System. Text narratives provided exercise equipment type (treadmill, elliptical, stationary bicycle, unspecified/other exercise machine). Approximately 70 302 (95% CI 59 086 to 81 519) mechanical exercise equipment-related injuries presented to US EDs nationally during 2007–2011, of which 66% were attributed to treadmills. Most injuries among children (≤4 years) were lacerations (34%) or soft tissue injuries (48%); among adults (≥25 years) injuries were often sprains/strains (30%). Injured older adults (≥65 years) had greater odds of being admitted, held for observation, or transferred to another hospital, compared with younger ages (OR: 2.58; 95% CI 1.45 to 4.60). Mechanical exercise equipment is a common cause of injury across ages. Injury awareness and prevention are important complements to active lifestyles. PMID:24061163

  15. Solid-State Thyratron Replacement. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roth, Ian

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was builtmore » in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.« less

  16. Success of smoking cessation interventions during pregnancy.

    PubMed

    Bérard, Anick; Zhao, Jin-Ping; Sheehy, Odile

    2016-11-01

    Smoking during pregnancy is a modifiable risk factor associated with adverse pregnancy outcomes. Smoking during pregnancy has been shown to increase the risk of spontaneous abortion, prematurity, low birthweight, congenital malformations, and sudden infant death syndrome. Despite the fact that it is well known that smoking can lead to adverse pregnancy outcomes, 13-25% of pregnant women overall continue to smoke during this critical period. The objective of the study was to evaluate the effect of gestational use of bupropion and nicotine patch replacement therapy on the risk of the following: (1) smoking cessation, (2) prematurity, and (3) small for gestational age. Women included in the Quebec Pregnancy Cohort who filled the annual autoadministered questionnaire between Jan. 1, 1998, and June 30, 2009, were studied. Smokers before gestation with a pregnancy resulting in a live birth comprised the study population. Three mutually exclusive study groups were formed among those who smoked at the beginning of pregnancy: gestational users of nicotine patch replacement therapy, bupropion, and smokers who did not use nicotine patch replacement therapy or bupropion. Rate of smoking cessation during pregnancy as well as the risk of prematurity and small for gestational age were studied. Of the 1288 women who met inclusion criteria, 900 were smokers, 72 were bupropion users, and 316 were nicotine patch replacement therapy users. Bupropion and nicotine patch replacement therapy use during pregnancy were associated with higher rates of smoking cessation: 81% in the bupropion group; 79% for nicotine patch replacement therapy; and 0% in those not using buproprion or nicotine patch replacement therapy. After discontinuing smoking cessation medications, 60% of bupropion users and 68% of nicotine patch replacement therapy users did not smoke again during and after pregnancy. Adjusting for potential confounders, nicotine patch replacement therapy use was associated with a lower risk of prematurity (adjusted odds ratio, 0.21, 95% confidence interval, 0.13-0.34), and small-for-gestational-age (adjusted odds ratio, 0.61, 95% confidence interval, 0.41-0.90) compared to smoking. Bupropion was associated with a lower risk of prematurity only (adjusted odds ratio, 0.12, 95% confidence interval, 0.03-0.50). Bupropion and nicotine patch replacement therapy have an impact on smoking cessation during and after pregnancy. Nicotine patch replacement therapy also decreased the risk of prematurity and small for gestational age. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. The road less taken: modularization and waterways as a domestic disaster response mechanism.

    PubMed

    Donahue, Donald A; Cunnion, Stephen O; Godwin, Evelyn A

    2013-01-01

    Preparedness scenarios project the need for significant healthcare surge capacity. Current planning draws heavily from the military model, leveraging deployable infrastructure to augment or replace extant capabilities. This approach would likely prove inadequate in a catastrophic disaster, as the military model relies on forewarning and an extended deployment cycle. Local equipping for surge capacity is prohibitively costly while movement of equipment can be subject to a single point of failure. Translational application of maritime logistical techniques and an ancient mode of transportation can provide a robust and customizable approach to disaster relief for greater than 90 percent of the American population.

  18. Upgrading of the LGD cluster at JINR to support DLNP experiments

    NASA Astrophysics Data System (ADS)

    Bednyakov, I. V.; Dolbilov, A. G.; Ivanov, Yu. P.

    2017-01-01

    Since its construction in 2005, the Computing Cluster of the Dzhelepov Laboratory of Nuclear Problems has been mainly used to perform calculations (data analysis, simulation, etc.) for various scientific collaborations in which DLNP scientists take an active part. The Cluster also serves to train specialists. Much has changed in the past decades, and the necessity has arisen to upgrade the cluster, increasing its power and replacing the outdated equipment to maintain its reliability and modernity. In this work we describe the experience of performing this upgrading, which can be helpful for system administrators to put new equipment for clusters of this type into operation quickly and efficiently.

  19. Repair of major system elements on Skylab

    NASA Technical Reports Server (NTRS)

    Pace, R. E., Jr.

    1975-01-01

    In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.

  20. Cost Benefit Analysis Modeling Tool for Electric vs. ICE Airport Ground Support Equipment – Development and Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James Francfort; Kevin Morrow; Dimitri Hochard

    2007-02-01

    This report documents efforts to develop a computer tool for modeling the economic payback for comparative airport ground support equipment (GSE) that are propelled by either electric motors or gasoline and diesel engines. The types of GSE modeled are pushback tractors, baggage tractors, and belt loaders. The GSE modeling tool includes an emissions module that estimates the amount of tailpipe emissions saved by replacing internal combustion engine GSE with electric GSE. This report contains modeling assumptions, methodology, a user’s manual, and modeling results. The model was developed based on the operations of two airlines at four United States airports.

  1. STS-103 crew take part in CEIT in the orbiter Discovery

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the mid-deck of the orbiter Discovery, STS-103 crew Commander Curtis L. Brown Jr. and Pilot Scott J. Kelly check out part of the equipment to be flown on the mission, the repair and upgrade of the Hubble Space Telescope. They are at KSC taking part in a Crew Equipment Interface Test along with other crew members Mission Specialists Steven L. Smith, C. Michael Foale (Ph.D.), John M. Grunsfeld (Ph.D.), Claude Nicollier of Switzerland, and Jean-Fran'''ois Clervoy of France. Nicollier and Clervoy are with the European Space Agency. Mission STS-103 is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will not only replace gyroscopes, it will also replace a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode. The scheduled launch date in October is under review.

  2. Evaluating wood failure in plywood shear by optical image analysis

    Treesearch

    Charles W. McMillin

    1984-01-01

    This exploratory study evaulates the potential of using an automatic image analysis method to measure percent wood failure in plywood shear specimens. The results suggest that this method my be as accurate as the visual method in tracking long-term gluebond quality. With further refinement, the method could lead to automated equipment replacing the subjective visual...

  3. Photocopy of drawing (this photograph is an 8" x 10" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1991 original architectural drawing located at Building No. 458, NAS Pensacola, Florida) Replace windows, Building No. 45, Architectural building elevations, Sheet 2 of 2 - U.S. Naval Air Station, Equipment Shops & Offices, 206 South Avenue, Pensacola, Escambia County, FL

  4. 49 CFR 571.108 - Standard No. 108; Lamps, reflective devices, and associated equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... which the headlamp is in the design open operating position. Headlamp concealment device means a device.... Headlamp test fixture means a device designed to support a headlamp or headlamp assembly in the test... (other than a standardized sealed beam headlamp designed to conform to paragraph S7.3 or a replaceable...

  5. A Study of Community College Leadership Practices in Response to the Impending Leadership Crisis

    ERIC Educational Resources Information Center

    Corbett, Jane

    2012-01-01

    The literature attests to a leadership crisis that is predicted to impact leadership pipelines in just about every industry imaginable, including community colleges. This impending crisis is thought to be a result of baby boomer retirements plus the lack of next generation workers equipped with the skills to replace them. Community colleges are…

  6. 78 FR 52786 - Notice of Lodging of Proposed Consent Decree Under the Park System Resource Protection Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ... access to Defendants' property to plant, water, and monitor replacement trees, and conduct other appropriate activities. Defendants will also supply water and equipment to water the trees. The publication of....C. 19jj et seq., for destruction of, loss of, or injury to park system resources of the Saint Croix...

  7. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... properly or if any fluid flow is observed during the leakage test, the valve shall be repaired or replaced... maintenance of all fire- and gas-detection systems shall include the following: (i) Type, location, and number of detection sensors; (ii) Type and kind of alarms, including emergency equipment to be activated...

  8. Out of control little-used clinical assets are draining healthcare budgets.

    PubMed

    Horblyuk, Ruslan; Kaneta, Kristopher; McMillen, Gary L; Mullins, Christopher; O'Brien, Thomas M; Roy, Ankita

    2012-07-01

    To improve utilization and reduce the cost of maintaining mobile clinical equipment, healthcare organization leaders should do the following: Select an initial asset group to target. Conduct a physical inventory. Evaluate the organization's asset "ecosystem." Optimize workflow processes. Phase in new processes, and phase out inventory. Devote time to change management. Develop a replacement strategy.

  9. Technical Report from Grant Recipient - City of Redlands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giorgianni, Kathleen Margaret

    2016-05-26

    The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).

  10. Wearable technology: using Google Glass as a teaching tool

    PubMed Central

    Knight, Hui Min; Gajendragadkar, Parag Ravindra; Bokhari, Awais

    2015-01-01

    Wearable technology holds great promise in revolutionising healthcare delivery. The benefits can also be seen in medical education and delivering healthcare in remote places. We report the use of Google Glass technology as a teaching tool in broadcasting a procedure onto a mobile phone as a viewer, replacing expensive and often cumbersome existing equipment. PMID:25969411

  11. Personnel Replacements Operations during Operations Desert Storm and Desert Shield

    DTIC Science & Technology

    2015-06-12

    overwhelming success. The United States was able to deploy forces to Saudi Arabia at the request of the Saudi King , and the Americans were able to...publication “War in the Persian Gulf”, Saddam’s army “numbered over a million soldiers.”4 More importantly, the Iraqi Army “was well equipped by the...

  12. China Report, Economic Affairs

    DTIC Science & Technology

    1986-04-09

    improve the quality of goods for export. Jinan Knitwear Mill imported advanced technology to replace obsolete equipment and raised product quality...concentrating their strength on improving technology and developing social productive forces, fully developing their own strong points and running...Discovered in Qinghai 44 INDUSTRY Fashion Design Booming Industry in China (XINHUA, 17 Mar 86) 45 b - Anhui Raw Materials Development

  13. A Manual of Simplified Laboratory Methods for Operators of Wastewater Treatment Facilities.

    ERIC Educational Resources Information Center

    Westerhold, Arnold F., Ed.; Bennett, Ernest C., Ed.

    This manual is designed to provide the small wastewater treatment plant operator, as well as the new or inexperienced operator, with simplified methods for laboratory analysis of water and wastewater. It is emphasized that this manual is not a replacement for standard methods but a guide for plants with insufficient equipment to perform analyses…

  14. 14 CFR 121.353 - Emergency equipment for operations over uninhabited terrain areas: Flag, supplemental, and...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... survival type emergency locator transmitter. Batteries used in this transmitter must be replaced (or recharged, if the battery is rechargeable) when the transmitter has been in use for more than 1 cumulative hour, or when 50 percent of their useful life (or for rechargeable batteries, 50 percent of their...

  15. 14 CFR 121.353 - Emergency equipment for operations over uninhabited terrain areas: Flag, supplemental, and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... survival type emergency locator transmitter. Batteries used in this transmitter must be replaced (or recharged, if the battery is rechargeable) when the transmitter has been in use for more than 1 cumulative hour, or when 50 percent of their useful life (or for rechargeable batteries, 50 percent of their...

  16. 14 CFR 121.353 - Emergency equipment for operations over uninhabited terrain areas: Flag, supplemental, and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... survival type emergency locator transmitter. Batteries used in this transmitter must be replaced (or recharged, if the battery is rechargeable) when the transmitter has been in use for more than 1 cumulative hour, or when 50 percent of their useful life (or for rechargeable batteries, 50 percent of their...

  17. 14 CFR 121.353 - Emergency equipment for operations over uninhabited terrain areas: Flag, supplemental, and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... survival type emergency locator transmitter. Batteries used in this transmitter must be replaced (or recharged, if the battery is rechargeable) when the transmitter has been in use for more than 1 cumulative hour, or when 50 percent of their useful life (or for rechargeable batteries, 50 percent of their...

  18. 14 CFR 121.353 - Emergency equipment for operations over uninhabited terrain areas: Flag, supplemental, and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... survival type emergency locator transmitter. Batteries used in this transmitter must be replaced (or recharged, if the battery is rechargeable) when the transmitter has been in use for more than 1 cumulative hour, or when 50 percent of their useful life (or for rechargeable batteries, 50 percent of their...

  19. 2006 Combat Vehicles Conference

    DTIC Science & Technology

    2006-10-25

    stressed or worn out beyond economic repair due to combat operations by repairing, rebuilding, or procuring replacement equipment. These...lives Vehicle Hardening Logistics Solutions for the Warfighter • Unique and economical surge capability • Support in coordination with op tempo...Speed, • Diagnostics Indicators – DECU Health Check Indicator, Utility Bus Comm Failure, 1553 Bus Comm Failure; MPU Critical Failure, Cautions and

  20. 40 CFR 60.590 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or replacement of equipment (defined in § 60.591) for the purpose of process improvement which is... in § 60.591) within a process unit is an affected facility. (b) Any affected facility under paragraph... “process unit” in § 60.590 of this subpart until the EPA takes final action to require compliance and...

  1. Improved memory loading techniques for the TSRV display system

    NASA Technical Reports Server (NTRS)

    Easley, W. C.; Lynn, W. A.; Mcluer, D. G.

    1986-01-01

    A recent upgrade of the TSRV research flight system at NASA Langley Research Center retained the original monochrome display system. However, the display memory loading equipment was replaced requiring design and development of new methods of performing this task. This paper describes the new techniques developed to load memory in the display system. An outdated paper tape method for loading the BOOTSTRAP control program was replaced by EPROM storage of the characters contained on the tape. Rather than move a tape past an optical reader, a counter was implemented which steps sequentially through EPROM addresses and presents the same data to the loader circuitry. A cumbersome cassette tape method for loading the applications software was replaced with a floppy disk method using a microprocessor terminal installed as part of the upgrade. The cassette memory image was transferred to disk and a specific software loader was written for the terminal which duplicates the function of the cassette loader.

  2. Contraceptive social marketing and community-based distribution systems in Colombia.

    PubMed

    Vernon, R; Ojeda, G; Townsend, M C

    1988-01-01

    Three operations research experiments were carried out in three provinces of Colombia to improve the cost-effectiveness of Profamilia's nonclinic-based programs. The experiments tested: (a) whether a contraceptive social marketing (CSM) strategy can replace a community-based distribution (CBD) program in a high contraceptive use area; (b) if wage incentives for salaried CBD instructors will increase contraceptive sales; and (c) whether a specially equipped information, education, and communication (IEC) team can replace a cadre of rural promoters to expand family planning coverage. All three strategies proved to be effective, but only the CSM system yielded a profit. Despite this, Profamilia discontinued its CSM program soon after the experiment was completed. Unexpected government controls regulating the price and sale of contraceptives in Colombia made the program unprofitable. As a result, family planning agencies are cautioned against replacing CBD programs with CSM. Instead, CBD programs might adopt a more commercial approach to become more efficient.

  3. Replacement of Hydrochlorofluorocarbon (HCFC) -225 Solvent for Cleaning and Verification Sampling of NASA Propulsion Oxygen Systems Hardware, Ground Support Equipment, and Associated Test Systems

    NASA Technical Reports Server (NTRS)

    Burns, H. D.; Mitchell, M. A.; McMillian, J. H.; Farner, B. R.; Harper, S. A.; Peralta, S. F.; Lowrey, N. M.; Ross, H. R.; Juarez, A.

    2015-01-01

    Since the 1990's, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have used hydrochlorofluorocarbon-225 (HCFC-225), a Class II ozone-depleting substance, to safety clean and verify the cleanliness of large scale propulsion oxygen systems and associated test facilities. In 2012 through 2014, test laboratories at MSFC, SSC, and Johnson Space Center-White Sands Test Facility collaborated to seek out, test, and qualify an environmentally preferred replacement for HCFC-225. Candidate solvents were selected, a test plan was developed, and the products were tested for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Honewell Soltice (TradeMark) Performance Fluid (trans-1-chloro-3,3, 3-trifluoropropene) was selected to replace HCFC-225 at NASA's MSFC and SSC rocket propulsion test facilities.

  4. KSC-02pd0671

    NASA Image and Video Library

    2002-05-15

    KENNEDY SPACE CENTER, FLA. -- STS-111 Mission Specialist Philippe Perrin, with the French Space Agency, arrives at KSC aboard a T-38 jet aircraft to take part in Terminal Countdown Demonstration Test (TCDT) activities, along with the Expedition 5 crew, for launch of mission STS-111. Expedition 5 will travel on Space Shuttle Endeavour to the International Space Station as a replacement crew for Expedition 4. The TCDT is a rehearsal for launch and includes emergency egress training, familiarization with payload and a simulated launch countdown. Mission STS-111 is a utilization flight that will deliver equipment and supplies to the Station. Along with the Multi-Purpose Logisitics Module Leonardo, the payload includes the Mobile Base System, part of the Canadian Mobile Servicing System, or MSS, and an Orbital Replacement Unit, the replacement wrist/roll joint for the SSRMS (Canadarm2). Launch of Endeavour is scheduled for May 30, 2002

  5. Effect of increasing amounts of milk replacer powder added to whole milk on postweaning performance, reproduction, glucose metabolism, and mammary fat pad in dairy heifers.

    PubMed

    Lage, C F A; Azevedo, R A; Machado, F S; Campos, M M; Pereira, L G R; Tomich, T R; Carvalho, B C; Alves, B R C; Santos, G B; Brandão, F Z; Coelho, S G

    2017-11-01

    The aim of this study was to evaluate the effects of increasing the total solids (TS) content of liquid feed, by adding increasing amounts of milk replacer powder to whole milk, on age at puberty and postweaning performance, glucose metabolism, and mammary fat pad of dairy heifers. Crossbreed Holstein × Gyr heifers (n = 58) were distributed into 4 different treatments during the preweaning period. Treatments consisted of liquid feeds with TS content of 12.5 (actual TS = 13.5 ± 0.53%; n = 15), 15.0 (actual TS = 16.1 ± 0.03%; n = 15), 17.5 (actual TS = 18.2 ± 0.14%; n = 13), or 20.0% (actual TS = 20.4 ± 0.24%; n = 15), which were provided up to 59 d old. From 60 to 89 d old, the animals received the same starter offered during the preweaning period in addition to corn silage ad libitum starting at 70 d old. From 90 to 104 d old, the animals were adapted to a total mixed ration. At 105 d old, the animals were distributed in 4 paddocks equipped with electronic feed and water bins and were fed the same total mixed ration ad libitum. A period of adaptation to the electronic feed bins occurred from 105 to 119 d old. Feed and water intake and body weight and body frame development were assessed until puberty. Mammary gland evaluations were performed monthly by ultrasonography from 120 d of age until puberty onset. Puberty onset was determined as plasma progesterone concentration greater than 1 ng/mL in 2 consecutive samples collected 7 d apart. The date of puberty onset was recorded as the collection day of the first of these samples. A glucose tolerance test was performed at 280 d of age. The increased TS content of the liquid feed fed during the preweaning period did not affect dry matter intake, performance, age at puberty, glucose metabolism, or mammary gland fat pad at later stages of rearing process. Conversely, hip width and heart girth increased linearly up to 150 and 240 d of age, respectively, as a result of the increased TS concentration of the liquid feed during the preweaning period. Copyright © 2017 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  6. Menopausal Symptom Relief and Side Effects Experienced by Women Using Bioidentical Hormone Replacement Therapy and Synthetic Conjugated Equine Estrogen and/or Progestin Hormone Replacement Therapy, Part 1.

    PubMed

    Deleruyelle, Laura J

    2016-01-01

    The use of compounded bioidentical hormone replacement therapy by menopausal women has become a popular alternative to traditional synthetic conjugated equine estrogen and progestin hormone replacement therapy due to safety concerns raised by recent studies. However, due to the lack of randomized, large-scale trials to evaluate the efficacy and side-effect profile of compounded bioidentical hormone replacement therapy many healthcare providers are reluctant to prescribe such therapy. The purpose of this study was to compare women's menopausal symptom relief and side effects experienced when using compounded bioidentical hormone replacement therapy and traditional hormone replacement therapy. A descriptive comparative design was used. Inferential and descriptive statistical procedures including a paired difference t -test, two-sample t -test, and f tests (percentage, mean, standard deviation, frequency) were run on the Statistical Package for the Social Sciences. The framework used to guide this study was Lenz and Pugh's Theory of Unpleasant Symptoms. Surveys were distributed once to a convenient sample of women aged 35 and older when they dropped off or picked up their prescriptions at a pharmacy. Of the 216 surveys distributed, 70 were returned from those women taking compounded bioidentical hormone replacement therapy and 53 from traditional hormone replacement therapy. The survey contained 15 questions pertaining to age, duration of hormone replacement therapy, type and formulation of hormone replacement therapy, reasons for initiating hormone replacement therapy, symptoms before and one month after hormone replacement therapy, and side effects related to hormone replacement therapy. The results of this study will be summarized in forthcoming articles in this series. Copyright© by International Journal of Pharmaceutical Compounding, Inc.

  7. Healthcare Utilization and Costs of Knee or Hip Replacements versus Pain-Relief Injections

    PubMed Central

    Pasquale, Margaret K.; Louder, Anthony M.; Cheung, Raymond Y.; Reiners, Andrew T.; Mardekian, Jack; Sanchez, Robert J.; Goli, Veerainder

    2015-01-01

    Background Given the dramatic increase in total knee and hip replacement procedures among the US population aged 45 years and older, there is a need to compare the downstream healthcare utilization and costs between patients who undergo joint replacement and those who receive intraarticular injections as a low-cost alternative. Objective To compare changes in osteoarthritis (OA)-related healthcare utilization and costs for Medicare members with OA who underwent knee or hip replacement versus those receiving steroid or viscosupplementation injections. Methods Medicare members aged ≥45 years diagnosed with OA were identified for this retrospective longitudinal study. Data were compared for patients who underwent primary knee or hip replacement surgery between July 1, 2007, and June 30, 2012, and those receiving injection of pain-relief medication during the same period. The date of joint replacement surgery was considered the index date. For the comparison cohort, the index date was 180 days postinjection of the first intraarticular injection. Medical and pharmacy claims were examined longitudinally in 90-day increments, from 180 days preindex until 360 days postindex. Difference-in-difference analyses were conducted to compare the change in OA-related healthcare costs, postindex versus preindex, between the study cohorts. Time-to-event analyses were used to measure rates of readmissions and venous thromboembolism (VTE). Results The mean age was 70.7 years for patients with knee replacement, 71.7 years for those with hip replacement, and 71.1 years for those receiving pain-relief injection (P <.0001). The RxRisk-V comorbidity index scores were 4.7, 4.4, and 4.8, respectively (P <.0001). Difference-in-difference analyses indicated that decreases in OA-related costs were greater for the joint replacement cohorts (coefficient for knee replacement*time: −0.603; hip replacement*time: −0.438; P <.001 for both) than for the comparison cohort. The VTE rates were 5.6% (knee) and 5.1% (hip) postsurgery versus 1.4% (knee) and 1.3% (hip) presurgery. Conclusion The overall difference-in-difference results showed a greater decrease in healthcare utilization and costs for the members with joint replacement than for those receiving injection. PMID:26557232

  8. Mini Treadmill for Musculoskeletal Health

    NASA Technical Reports Server (NTRS)

    Humphreys, Bradley

    2015-01-01

    Because NASA's approach to space exploration calls for long-term extended missions, there is a pressing need to equip astronauts with effective exercise regimens that will maintain musculoskeletal and cardiovascular health. ZIN Technologies, Inc., has developed an innovative miniature treadmill for use in both zero-gravity and terrestrial environments. The treadmill offers excellent periodic impact exercise to stimulate cardiovascular activity and bone remodeling as well as resistive capability to encourage full-body muscle maintenance. A novel speed-control algorithm allows users to modulate treadmill speed by adjusting stride, and a new subject load device provides a more Earth-like gravity replacement load. This new and compact treadmill offers a unique approach to managing astronaut health while addressing the inherent and stringent challenges of space flight. The innovation also has the potential to offer numerous terrestrial applications, as a real-time daily load stimulus (DLS) measurement feature provides an effective mechanism to combat or manage osteoporosis, a major public health threat for 55 percent of Americans over the age of 50.

  9. Impact of automatic calibration techniques on HMD life cycle costs and sustainable performance

    NASA Astrophysics Data System (ADS)

    Speck, Richard P.; Herz, Norman E., Jr.

    2000-06-01

    Automatic test and calibration has become a valuable feature in many consumer products--ranging from antilock braking systems to auto-tune TVs. This paper discusses HMDs (Helmet Mounted Displays) and how similar techniques can reduce life cycle costs and increase sustainable performance if they are integrated into a program early enough. Optical ATE (Automatic Test Equipment) is already zeroing distortion in the HMDs and thereby making binocular displays a practical reality. A suitcase sized, field portable optical ATE unit could re-zero these errors in the Ready Room to cancel the effects of aging, minor damage and component replacement. Planning on this would yield large savings through relaxed component specifications and reduced logistic costs. Yet, the sustained performance would far exceed that attained with fixed calibration strategies. Major tactical benefits can come from reducing display errors, particularly in information fusion modules and virtual `beyond visual range' operations. Some versions of the ATE described are in production and examples of high resolution optical test data will be discussed.

  10. Real-time graphic display utility for nuclear safety applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, S.; Huang, X.; Taylor, J.

    2006-07-01

    With the increasing interests in the nuclear energy, new nuclear power plants will be constructed and licensed, and older generation ones will be upgraded for assuring continuing operation. The tendency of adopting the latest proven technology and the fact of older parts becoming obsolete have made the upgrades imperative. One of the areas for upgrades is the older CRT display being replaced by the latest graphics displays running under modern real time operating system (RTOS) with safety graded modern computer. HFC has developed a graphic display utility (GDU) under the QNX RTOS. A standard off-the-shelf software with a long historymore » of performance in industrial applications, QNX RTOS used for safety applications has been examined via a commercial dedication process that is consistent with the regulatory guidelines. Through a commercial survey, a design life cycle and an operating history evaluation, and necessary tests dictated by the dedication plan, it is reasonably confirmed that the QNX RTOS was essentially equivalent to what would be expected in the nuclear industry. The developed GDU operates and communicates with the existing equipment through a dedicated serial channel of a flat panel controller (FPC) module. The FPC module drives a flat panel display (FPD) monitor. A touch screen mounted on the FPD serves as the normal operator interface with the FPC/FPD monitor system. The GDU can be used not only for replacing older CRTs but also in new applications. The replacement of the older CRT does not disturb the function of the existing equipment. It not only provides modern proven technology upgrade but also improves human ergonomics. The FPC, which can be used as a standalone controller running with the GDU, is an integrated hardware and software module. It operates as a single board computer within a control system, and applies primarily to the graphics display, targeting, keyboard and mouse. During normal system operation, the GDU has two sources of data input: a serial interface with field equipment and a serial input from the FPD touch screen. The mechanism for data collection from the field equipment consists of the regular exchange of the data update request messages and target commands sent to the equipment and the update messages returned to the FPC. The data updates from field equipment control displays presented on the graphic pages. Touch screen contacts are decoded to identify physical position that was contacted. If that position corresponds with one of the buttons on the graphic page, the software uses that input to initiate the function defined for the particular button contacted. In this paper, the FPC will be illustrated as a standalone system as well as a module in a dedicated control system. The GDU design concepts and its design flow will be demonstrated. The dedication process of the QNX RTOS needed for the GDU will be highlighted. Finally, the GDU with a specific application example used in one of the nuclear power plants will be presented. (authors)« less

  11. Technology and the future of medical equipment maintenance.

    PubMed

    Wear, J O

    1999-05-01

    Maintenance of medical equipment has been changing rapidly in the past few years. It is changing more rapidly in developed countries, but changes are also occurring in developing countries. Some of the changes may permit improved maintenance on the higher technology equipment in developing countries, since they do not require onsite expertise. Technology has had an increasing impact on the development of medical equipment with the increased use of microprocessors and computers. With miniaturization from space technology and electronic chip design, powerful microprocessors and computers have been built into medical equipment. The improvement in manufacturing technology has increased the quality of parts and therefore the medical equipment. This has resulted in increased mean time between failures and reduced maintenance needs. This has made equipment more reliable in remote areas and developing countries. The built-in computers and advances in software design have brought about self-diagnostics in medical equipment. The technicians now have a strong tool to be used in maintenance. One problem in this area is getting access to the self-diagnostics. Some manufacturers will not readily provide this access to the owner of the equipment. Advances in telecommunications in conjunction with self-diagnostics make available remote diagnosis and repair. Since components can no longer be repaired, a remote repair technician can instruct an operator or an on-site repairman on board replacement. In case of software problems, the remote repair technician may perform the repairs over the telephone. It is possible for the equipment to be monitored remotely by modern without interfering with the operation of the equipment. These changes in technology require the training of biomedical engineering technicians (BMETs) to change. They must have training in computers and telecommunications. Some of this training can be done with telecommunications and computers.

  12. Design of Alarm Sound of Home Care Equipment Based on Age-related Auditory Sense

    NASA Astrophysics Data System (ADS)

    Shibano, Jun-Ichi; Tadano, Shigeru; Kaneko, Hirotaka

    A wide variety of home care equipment has been developed to support the independent lifestyle and care taking of elderly persons. Almost all of the equipment has an alarm designed to alert a care person or to sound a warning in case of an emergency. Due to the fact that aging human beings' senses physiologically, weaken and deteriorate, each alarm's sound must be designed to account for the full range of elderly person's hearing loss. Since the alarms are usually heard indoors, it is also necessary to evaluate the relationship between the basic characteristics of the sounds and living area's layout. In this study, we investigated the sounds of various alarms of the home care equipment based on both the age-related hearing characteristics of elderly persons and the propagation property of the sounds indoors. As a result, it was determined that the hearing characteristics of elderly persons are attuned to sounds which have a frequency from 700Hz to 1kHz, and it was learned that the indoor absorption ratio of sound is smallest when the frequency is 1kHz. Therefore, a frequency of 1kHz is good for the alarm sound of home care equipment. A flow chart to design the alarm sound of home care equipment was proposed, taking into account the extent of age-related auditory sense deterioration.

  13. Safety standards and socioeconomic disparities in school playground injuries: a retrospective cohort study

    PubMed Central

    2010-01-01

    Background Playground injuries are fairly common and can require hospitalization and or surgery. Previous research has suggested that compliance with guidelines or standards can reduce the incidence of such injuries, and that poorer children are at increased risk of playground injuries. Objective The objective of this study was to determine the association between playground injury and school socioeconomic status before and after the upgrading of playground equipment to meet CSA guidelines. Methods Injury data were collected from January 1998-December 1999 and January 2004 - June 2007 for 374 elementary schools in Toronto, Canada. The objective of this study was to investigate the effect of a program of playground assessment, upgrading, and replacement on school injury rates and socio-economic status. Injury rates were calculated for all injuries, injuries that did not occur on equipment, and injuries on play equipment. Poisson regression was performed to determine the relationship between injury rates and school socio-economic status. Results Prior to upgrading the equipment there was a significant relationship between socio-economic status and equipment-related injuries with children at poorer schools being at increased risk (Relative risk: 1.52 [95% CI = 1.24-1.86]). After unsafe equipment was upgraded, the relationship between injury and SES decreased and was no longer significant (RR 1.13 [95% CI = 0.95-1.32]). Conclusions Improvements in playground equipment can result in an environment in which students from schools in poorer neighbourhoods are no longer at increased risk of injuries on play equipment. PMID:20825679

  14. Tricuspid valve replacement with mechanical prostheses: Short and long-term outcomes.

    PubMed

    Rossello, Xavier; Muñoz-Guijosa, Christian; Mena, Elisabet; Camprecios, Marta; Mendez, Ana B; Borras, Xavier; Padro, Josep M

    2017-09-01

    Tricuspid valve replacement has been associated with high mortality and poor long-term outcomes. We report the preoperative risk factors associated with short and long-term outcomes following tricuspid valve replacement with mechanical prostheses. In 62 patients who underwent mechanical tricuspid valve replacement, clinical, laboratory, and echocardiographic findings were analyzed using both univariate and multivariate analyses to describe operative and long-term mortality. In our population (mean age 59 ± 9.7 years, 82.3% female), most common causes of tricuspid valve disease were rheumatic fever (69.4%) and functional regurgitation (19.4%). Operative and long-term mortality were 17.7 and 33.9%, respectively. Age, diabetes mellitus, and coronary artery disease were independently associated with increased long-term mortality. New York Heart Association (NYHA) class and right heart failure symptoms significantly improved during follow-up. In this series of mechanical tricuspid valve replacements in patients with predominately rheumatic heart disease, operative and long-term mortality were increased; however, survivors had significant improvement in their NYHA class and freedom from right heart failure symptoms. Three preoperative factors (age, diabetes mellitus, and coronary artery disease) were independently associated with long-term mortality. © 2017 Wiley Periodicals, Inc.

  15. Beneficial prenatal levodopa therapy in autosomal recessive guanosine triphosphate cyclohydrolase 1 deficiency.

    PubMed

    Brüggemann, Norbert; Spiegler, Juliane; Hellenbroich, Yorck; Opladen, Thomas; Schneider, Susanne A; Stephani, Ulrich; Boor, Rainer; Gillessen-Kaesbach, Gabriele; Sperner, Jürgen; Klein, Christine

    2012-08-01

    To report the first prenatal dopaminergic replacement therapy in autosomal recessive (AR) guanosine triphosphate cyclohydrolase 1 (GTPCH) deficiency without hyperphenylalaninemia. Case reports, literature review, and video presentation. University of Lübeck, Lübeck, Germany. Two boys from a consanguineous family. Physical and mental development as a function of replacement initiation. The older sibling presented with typical features of AR GTPCH deficiency due to a homozygous mutation in the GCH1 gene with proven pathogenicity. Levodopa treatment was initiated at age 10 months and resulted in a distinct motor improvement. However, mental development was delayed. In the younger sibling, prenatal replacement therapy was initiated after a prenatal diagnosis of AR GTPCH deficiency was made. At age 17 months, both motor and mental development were normal for his age. This report highlights the importance of an early diagnosis, including prenatal diagnosis, of complex dopa-responsive extrapyramidal syndromes. Prenatally initiated dopaminergic replacement therapy is beneficial and thus justified in AR GTPCH deficiency, allowing prevention of significant impairment of mental abilities.

  16. Energy Saving Melting and Revert Reduction Technology: Melting Efficiency in Die Casting Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Schwam

    2012-12-15

    This project addressed multiple aspects of the aluminum melting and handling in die casting operations, with the objective of increasing the energy efficiency while improving the quality of the molten metal. The efficiency of melting has always played an important role in the profitability of aluminum die casting operations. Consequently, die casters need to make careful choices in selecting and operating melting equipment and procedures. The capital cost of new melting equipment with higher efficiency can sometimes be recovered relatively fast when it replaces old melting equipment with lower efficiency. Upgrades designed to improve energy efficiency of existing equipment maymore » be well justified. Energy efficiency is however not the only factor in optimizing melting operations. Melt losses and metal quality are also very important. Selection of melting equipment has to take into consideration the specific conditions at the die casting shop such as availability of floor space, average quantity of metal used as well as the ability to supply more metal during peaks in demand. In all these cases, it is essential to make informed decisions based on the best available data.« less

  17. Reviews Book: Marie Curie and Her Daughters Resource: Cumulus Equipment: Alpha Particle Scattering Apparatus Equipment: 3D Magnetic Tube Equipment: National Grid Transmission Model Book: Einstein's Physics Equipment: Barton's Pendulums Equipment: Weather Station Web Watch

    NASA Astrophysics Data System (ADS)

    2013-09-01

    WE RECOMMEND Marie Curie and Her Daughters An insightful study of a resilient and ingenious family and their achievements Cumulus Simple to install and operate and with obvious teaching applications, this weather station 'donationware' is as easy to recommend as it is to use Alpha Particle Scattering Apparatus Good design and construction make for good results National Grid Transmission Model Despite its expense, this resource offers excellent value Einstein's Physics A vivid, accurate, compelling and rigorous treatment, but requiring an investment of time and thought WORTH A LOOK 3D Magnetic Tube Magnetic fields in three dimensions at a low cost Barton's Pendulums A neat, well-made and handy variant, but not a replacement for the more traditional version Weather Station Though not as robust or substantial as hoped for, this can be put to good use with the right software WEB WATCH An online experiment and worksheet are useful for teaching motor efficiency, a glance at CERN, and NASA's interesting information on the alpha-magnetic spectrometer and climate change

  18. The introduction of new critical care equipment into the aeromedical evacuation service of the Royal Air Force.

    PubMed

    Lamb, Di

    2003-04-01

    Changing world events over recent years and an increasingly complex patient casemix have led to a review of the equipment used by the Aeromedical Evacuation Squadron of the Royal Air Force. The initial special purpose aeromedical equipment (SPAME) project was completed in 2001 with the new equipment being brought into service in August of the same year. The project incorporated long term planning for replacing the equipment along with its rapidly developing technology, especially with that used for the care of the critically ill. An intensive training programme was simultaneously introduced to support the deployment of this new technology. Critical care teams comprise a consultant anaesthetist, a critical care nurse, a flight nurse attendant (paramedic) and a technician, all of whom attend courses designed specifically to accommodate their role within the team.A considerable amount of work has been undertaken by a dedicated team to ensure this project became a reality and which has resulted in the provision of care to meet the needs of any casualty, anywhere in the world, being achieved using the latest technology proportionate to any hospital-based ICU.

  19. Current status and standards for establishment of hemodialysis units in Korea

    PubMed Central

    Lee, Young-Ki; Kim, Kiwon

    2013-01-01

    The number of hemodialysis patients and dialysis facilities is increasing each year, but there are no surveillance programs validating that the services and equipment of each hemodialysis unit meet specified safety and quality standards. There is a concern that excessive competition and illegal activities committed by some dialysis facilities may violate patients' right to health. Contrastingly, developed countries often have their own survey program to provide initial certification and monitoring to ensure that these clinics continue to meet basic requirements. Because hemodialysis units provide renal replacement therapy to critical patients suffering from severe chronic renal failure, appropriate legal regulation is important for the provision of initial certification and maintenance of facility, equipment, and human resource quality. Therefore, several standards providing minimum requirements for the area of hemodialysis unit, equipment for emergency care, physician and nurse staffs, water purification and quality management are urgently needed. PMID:23682218

  20. KSC-08pd2557

    NASA Image and Video Library

    2008-09-05

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center, crew members with the STS-125 mission get a close look at some of the equipment associated with their mission to service NASA’s Hubble Space Telescope. In the foreground, center, are Mission Specialists Mike Massimino and Michael Good, looking at the box containing the Cosmic Origins Spectrograph, or COS, on the orbital replacement unit carrier. COS will be the most sensitive ultraviolet spectrograph ever flown on Hubble and will probe the "cosmic web" - the large-scale structure of the universe whose form is determined by the gravity of dark matter and is traced by galaxies and intergalactic gas. The STS-125 crew is taking part in a crew equipment interface test, which provides experience handling tools, equipment and hardware they will use on their mission. Space shuttle Atlantis is targeted to launch on the STS-125 mission Oct. 10. Photo credit: NASA/Kim Shiflett

Top