An Investment Level Decision Method to Secure Long-term Reliability
NASA Astrophysics Data System (ADS)
Bamba, Satoshi; Yabe, Kuniaki; Seki, Tomomichi; Shibaya, Tetsuji
The slowdown in power demand increase and facility replacement causes the aging and lower reliability in power facility. And the aging is followed by the rapid increase of repair and replacement when many facilities reach their lifetime in future. This paper describes a method to estimate the repair and replacement costs in future by applying the life-cycle cost model and renewal theory to the historical data. This paper also describes a method to decide the optimum investment plan, which replaces facilities in the order of cost-effectiveness by setting replacement priority formula, and the minimum investment level to keep the reliability. Estimation examples applied to substation facilities show that the reasonable and leveled future cash-out can keep the reliability by lowering the percentage of replacements caused by fatal failures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Guidance for Determining the Acceptable Construction Area for Auxiliary and Replacement Facilities A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL...
78 FR 47695 - Sam Rayburn Dam Power Rate
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...
Energy consumption and load profiling at major airports. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kennedy, J.
1998-12-01
This report describes the results of energy audits at three major US airports. These studies developed load profiles and quantified energy usage at these airports while identifying procedures and electrotechnologies that could reduce their power consumption. The major power consumers at the airports studied included central plants, runway and taxiway lighting, fuel farms, terminals, people mover systems, and hangar facilities. Several major findings emerged during the study. The amount of energy efficient equipment installed at an airport is directly related to the age of the facility. Newer facilities had more energy efficient equipment while older facilities had much of themore » original electric and natural gas equipment still in operation. As redesign, remodeling, and/or replacement projects proceed, responsible design engineers are selecting more energy efficient equipment to replace original devices. The use of computer-controlled energy management systems varies. At airports, the primary purpose of these systems is to monitor and control the lighting and environmental air conditioning and heating of the facility. Of the facilities studied, one used computer management extensively, one used it only marginally, and one had no computer controlled management devices. At all of the facilities studied, natural gas is used to provide heat and hot water. Natural gas consumption is at its highest in the months of November, December, January, and February. The Central Plant contains most of the inductive load at an airport and is also a major contributor to power consumption inefficiency. Power factor correction equipment was used at one facility but was not installed at the other two facilities due to high power factor and/or lack of need.« less
Kuipers replaces the ESEM-1 with new ESEM in the U.S. Laboratory
2011-12-28
ISS030-E-033367 (28 Dec. 2011) --- In the International Space Station?s Destiny laboratory, European Space Agency astronaut Andre Kuipers, Expedition 30 flight engineer, replaces the faulty Exchangeable Standard Electronic Module 1 (ESEM-1) behind the front panel of the Microgravity Science Glovebox Remote Power Distribution Assembly (MSG RPDA) with the new spare. The ESEM is used to distribute station main power to the entire MSG facility.
NASA Astrophysics Data System (ADS)
1981-09-01
Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.
NASA Technical Reports Server (NTRS)
1981-01-01
Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.
NASA Ames Research Center 60 MW Power Supply Modernization
NASA Technical Reports Server (NTRS)
Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)
2001-01-01
The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.
Control console replacement at the WPI Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
Upgrades at the NASA Langley Research Center National Transonic Facility
NASA Technical Reports Server (NTRS)
Paryz, Roman W.
2012-01-01
Several projects have been completed or are nearing completion at the NASA Langley Research Center (LaRC) National Transonic Facility (NTF). The addition of a Model Flow-Control/Propulsion Simulation test capability to the NTF provides a unique, transonic, high-Reynolds number test capability that is well suited for research in propulsion airframe integration studies, circulation control high-lift concepts, powered lift, and cruise separation flow control. A 1992 vintage Facility Automation System (FAS) that performs the control functions for tunnel pressure, temperature, Mach number, model position, safety interlock and supervisory controls was replaced using current, commercially available components. This FAS upgrade also involved a design study for the replacement of the facility Mach measurement system and the development of a software-based simulation model of NTF processes and control systems. The FAS upgrades were validated by a post upgrade verification wind tunnel test. The data acquisition system (DAS) upgrade project involves the design, purchase, build, integration, installation and verification of a new DAS by replacing several early 1990's vintage computer systems with state of the art hardware/software. This paper provides an update on the progress made in these efforts. See reference 1.
Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1995-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less
Army Corrosion Prevention and Control (CPC) Program for Facilities and Infrastructure
2010-02-01
FY2009 - 2011 • Benefits: Reduced corrosion due to elimination of metallic rebar , reduced weight equates to reduced dead load and increased dynamic...Decks as Replacement for Steel Reinforced Concrete Decks F09AR04: Corrosion Resistant Roofs with Integrated Sustainable PV Power Systems • Where...Army Corrosion Prevention and Control (CPC) Program for Facilities and Infrastructure Dr. Craig E. College Deputy Assistant Chief of Staff for
Control console replacement at the WPI Reactor. [Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
Cost Differences in Public and Private Shipyards
1981-01-01
block number) coefficients, costs, maintenance, naval shore facilities, naval vessels, nuclear powered ships, regression analysis, repair, salaries...of overhauls of nucler submarines, we mnight exp.,_t to find both production costs and the price of labor to be higher in naval shipyardi than in...about 18 months; in addition to the type of work done during regular overhauls, they include replacement of the nuclear core which powers the submarine
Dynamic EROI Assessment of the IPCC 21st Century Electricity Production Scenario
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neumeyer, Charles; Goldston, Robert
Abstract: The Energy Return on Investment (EROI) is an important measure of the energy gain of an electrical power generating facility that is typically evaluated based on the life cycle energy balance of a single facility. The EROI concept can be extended to cover a collection of facilities that comprise a complete power system and used to assess the expansion and evolution of a power system as it transitions from one portfolio mix of technologies to another over time. In this study we develop a dynamic EROI model that simulates the evolution of a power system and we perform anmore » EROI simulation of one of the electricity production scenarios developed under the auspices of the Intergovernmental Panel on Climate Change (IPCC) covering the global supply of electricity in the 21st century. Our analytic tool provides the means for evaluation of dynamic EROI based on arbitrary time-dependent demand scenarios by modeling the required expansion of power generation, including the plowback needed for new construction and to replace facilities as they are retired. The results provide insight into the level of installed and delivered power, above and beyond basic consumer demand, that is required to support construction during expansion, as well as the supplementary power that may be required if plowback constraints are imposed. In addition, sensitivity to EROI parameters, and the impact of energy storage efficiency are addressed.« less
Dynamic EROI Assessment of the IPCC 21st Century Electricity Production Scenario
Neumeyer, Charles; Goldston, Robert
2016-04-28
Abstract: The Energy Return on Investment (EROI) is an important measure of the energy gain of an electrical power generating facility that is typically evaluated based on the life cycle energy balance of a single facility. The EROI concept can be extended to cover a collection of facilities that comprise a complete power system and used to assess the expansion and evolution of a power system as it transitions from one portfolio mix of technologies to another over time. In this study we develop a dynamic EROI model that simulates the evolution of a power system and we perform anmore » EROI simulation of one of the electricity production scenarios developed under the auspices of the Intergovernmental Panel on Climate Change (IPCC) covering the global supply of electricity in the 21st century. Our analytic tool provides the means for evaluation of dynamic EROI based on arbitrary time-dependent demand scenarios by modeling the required expansion of power generation, including the plowback needed for new construction and to replace facilities as they are retired. The results provide insight into the level of installed and delivered power, above and beyond basic consumer demand, that is required to support construction during expansion, as well as the supplementary power that may be required if plowback constraints are imposed. In addition, sensitivity to EROI parameters, and the impact of energy storage efficiency are addressed.« less
NASA Astrophysics Data System (ADS)
Wasko, Frank
Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic assessment review and then on to the stakeholder cost benefit analysis (if model qualifications are met) leading to a final plant retirement decision. This application via the model and guide, in turn, will lead electric utilities to explore system upgrade import opportunities and mitigation measures versus building new replacement generation facilities. United States nuclear reactors are licensed for 40 years with a 20 year extension available prior to the expiration date (EIA, 2013). Since late 2012, electric power companies have announced the early retirement of four uneconomical nuclear power plants while other studies have indicated that as many as 70 percent of United States nuclear power plants are potentially at risk for early retirement (Crooks, 2014 and Cooper, 2013). A high percentage of these aforementioned nuclear plants have operating licenses that will not expire until 2030 and beyond. Thus, for the most part, replacement power contingency planning has not been initiated for these plants or is still in preliminary stages. The recent nuclear plant retirements are the first since 1998 (EIA, 2013). Decisions to retire the plants involved concerns over maintenance and repair costs as well as declining profitability (EIA, 2013). In addition, the Energy Information Administration (2010-2012) released data that demonstrated that the worst 25 percent of United States nuclear plants are far more expensive to operate and generate electricity than new gas plants. It is equally important to understand and explain the economic and power replacement implications to both ratepayers and end-users. A SONGS case study analysis will review the economic, operational and political challenges that SCE faced leading to the retirement decision of SONGS. As preface to the case study, replacement steam generators (RSGs) were installed in Unit 2 in 2009 and in Unit 3 in 2010. In January 2012, while Unit 2 was down for routine maintenance, a small leak was discovered inside a steam generator in Unit 3. Because of the situation, both units remained shut down to evaluate the cause of the leakage and to make repairs. SCE submitted plans to the Nuclear Regulatory Commission (NRC) to re-start Unit 2 at reduced power. However, concerns over the length of the review process and the high costs associated with steam generator repairs led SCE to retire both reactors (SCE SONGS Fact Sheets, 2012-2013). Finally, collaborative resource power replacement planning is needed more than ever as nuclear facilities in the United States are now being retired for economic related reasons (Crooks, 2014). This collaborative power replacement process and implementation must encompass all relevant stakeholders including state grid operators, ratepayers, shareholders and the electric utility company.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
...'s existing Payson Gate Meter Station for the downstream Lake Side 2 Power Plant. No incremental... County: A second compressor package at its existing Thistle Creek Compressor Station; Replacement of... pressure; and Metering and ancillary facility upgrades at Questar's existing Payson Gate Meter Station. In...
Dynamometer Research Facilities | Wind | NREL
drivetrains by replacing the rotor and blades of a turbine with a powerful motor. The National Renewable -horsepower variable-speed induction motor, with AC grid connections of 120, 240, and 480 volts (V) and a dynamometer features a 3,351-horsepower (hp), 415-amp AC induction motor with variable-frequency drive that
DOE Office of Scientific and Technical Information (OSTI.GOV)
Utroska, D.
Vandalism on a controversial power line led the owners to turn over a 176-mile portion of the line to the Rural Electrification Administration and make it a Federal facility. This allows the Federal Bureau of Investigation and other Federal agencies to help identify and apprehend the vandals. The 436-mile direct-current T-line connects a mine-mouth coal-fired generating station in North Dakota with central-Minnesota consumers. Protest against the project led to the toppling of 14 towers. Replacement and security costs became too great for the co-owners - the United Power Authority and the Cooperative Power Authority - to bear alone. (DCK)
USMC ISR: Preparing for the A2AD Threat
2014-06-13
millimeter waves, high - power microwaves, lasers or electromagnetic pulses (Brimley 2013, 15). Replacing modern day munitions, directed- energy ...space and cyber capabilities” (JCS, 26). The precept further states the need to protect access to the electromagnetic spectrum. Given the high cost...is the “division of electronic warfare involving the use of electromagnetic , directed energy , or antiradiation weapons to attack personnel, facilities
Testing of electrical equipment for a commercial grade dedication program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, J.L.; Srinivas, N.
1995-10-01
The availability of qualified safety related replacement parts for use in nuclear power plants has decreased over time. This has caused many nuclear power plants to purchase commercial grade items (CGI) and utilize the commercial grade dedication process to qualify the items for use in nuclear safety related applications. The laboratories of Technical and Engineering Services (the testing facility of Detroit Edison) have been providing testing services for verification of critical characteristics of these items. This paper presents an overview of the experience in testing electrical equipment with an emphasis on fuses.
Inertial Fusion Power Plant Concept of Operations and Maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anklam, T.; Knutson, B.; Dunne, A. M.
2015-01-15
Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oilmore » refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.« less
Inertial fusion power plant concept of operations and maintenance
NASA Astrophysics Data System (ADS)
Knutson, Brad; Dunne, Mike; Kasper, Jack; Sheehan, Timothy; Lang, Dwight; Anklam, Tom; Roberts, Valerie; Mau, Derek
2015-02-01
Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... facility portion of the Chemistry and Metallurgy Research Building Replacement Project (CMRR-NF) at Los...
10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Noel Duckwtiz
2011-05-01
Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. •more » Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.« less
1975-01-29
will shut down automatically when condenser high pressure causes Pressure Limit Control high pressure switch to release. Press START switch (3...power cable (1) from facility pow- er. Troubleshoot cooling unit, for HI-LOW pressure switch repeated cutout. Refer to AGE ECU Cooling Unit...acti- vate when loss of air flow oc- curred, the pressure switch (3) failed to open circuit. Adjust or replace pressure switch . Refer to
SPERTI Gate House at control area (PER603). Floor plan, elevations, ...
SPERT-I Gate House at control area (PER-603). Floor plan, elevations, sections. This Gate House replaced the original gate house, for which drawings are no longer extant. F.C. Torkelson 842-SPERT-603-A-1. Date: February 1962. INEEL index no. 760-0603-00-851-151336 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
NEPA Manual for Materiel Acquisition
2000-11-01
of it in the final EIS. For example, a commentor on a draft EIS on a proposal for a pumped storage power facility might suggest that the applicant’s...strips around streams and replacing inorganic fertilizers with animal manures, and reducing soil erosion through modified tillage and irrigation...available items and products for military application (for example, sportsman’s products and wear such as holsters , shotguns, sidearms, protective shields
The New Heavy Gas Testing Capability in the NASA Langley Transonic Dynamics Tunnel
NASA Technical Reports Server (NTRS)
Cole, Stanley R.; Rivera, Jose A., Jr.
1997-01-01
The NASA Langley Transonic Dynamics Tunnel (TDT) has provided a unique capability for aeroelastic testing for over thirty-five years. The facility has a rich history of significant contributions to the design of many United States commercial transports and military aircraft. The facility has many features which contribute to its uniqueness for aeroelasticity testing; however, perhaps the most important facility capability is the use of a heavy gas test medium to achieve higher test densities. Higher test medium densities substantially improve model building requirements and therefore simplify the fabrication process for building aeroelastically scaled wind-tunnel models. The heavy gas also provides other testing benefits, including reduction in the power requirements to operate the facility during testing. Unfortunately, the use of the original heavy gas has been curtailed due to environmental concerns. A new gas, referred to as R-134a, has been identified as a suitable replacement for the former TDT heavy gas. The TDT is currently undergoing a facility upgrade to allow testing in R-134a heavy gas. This replacement gas will result in an operational test envelope, model scaling advantages, and general testing capabilities similar to those available with the former TDT heavy gas. As such, the TDT is expected to remain a viable facility for aeroelasticity research and aircraft dynamic clearance testing well into the 21st century. This paper describes the anticipated advantages and facility calibration plans for the new heavy gas and briefly reviews several past test programs that exemplify the possible benefits of heavy gas testing.
Facility Accounting: Hammering Out a Capital Replacement Budget.
ERIC Educational Resources Information Center
Readinger, Jay
1996-01-01
Most facility and finance managers cannot adequately handle school infrastructure issues because they lack the tools to describe the problem appropriately. Facility accounting gives managers accurate deferral and projected replacement costs, using nationally recognized life-cycle and cost data. Facility accounting enables proper management of…
Geographic disparities in patient travel for dialysis in the United States.
Stephens, J Mark; Brotherton, Samuel; Dunning, Stephan C; Emerson, Larry C; Gilbertson, David T; Harrison, David J; Kochevar, John J; McClellan, Ann C; McClellan, William M; Wan, Shaowei; Gitlin, Matthew
2013-01-01
To estimate travel distance and time for US hemodialysis patients and to compare travel of rural versus urban patients. Dialysis patient residences were estimated from ZIP code-level patient counts as of February 2011 allocated within the ZIP code proportional to census tract-level population, obtained from the 2010 U.S. Census. Dialysis facility addresses were obtained from Medicare public-use files. Patients were assigned to an "original" and "replacement" facility, assuming patients used the facility closest to home and would select the next closest facility as a replacement, if a replacement facility was required. Driving distances and times were calculated between patient residences and facility locations using GIS software. The mean one-way driving distance to the original facility was 7.9 miles; for rural patients average distances were 2.5 times farther than for urban patients (15.9 vs. 6.2 miles). Mean driving distance to a replacement facility was 10.6 miles, with rural patients traveling on average 4 times farther than urban patients to a replacement facility (28.8 vs. 6.8 miles). Rural patients travel much longer distances for dialysis than urban patients. Accessing alternative facilities, if required, would greatly increase rural patient travel, while having little impact on urban patients. Increased travel could have clinical implications as longer travel is associated with increased mortality and decreased quality of life. © 2013 National Rural Health Association.
Virtual sensors for robust on-line monitoring (OLM) and Diagnostics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tipireddy, Ramakrishna; Lerchen, Megan E.; Ramuhalli, Pradeep
Unscheduled shutdown of nuclear power facilities for recalibration and replacement of faulty sensors can be expensive and disruptive to grid management. In this work, we present virtual (software) sensors that can replace a faulty physical sensor for a short duration thus allowing recalibration to be safely deferred to a later time. The virtual sensor model uses a Gaussian process model to process input data from redundant and other nearby sensors. Predicted data includes uncertainty bounds including spatial association uncertainty and measurement noise and error. Using data from an instrumented cooling water flow loop testbed, the virtual sensor model has predictedmore » correct sensor measurements and the associated error corresponding to a faulty sensor.« less
34 CFR 395.6 - Vendor ownership of vending facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...
34 CFR 395.6 - Vendor ownership of vending facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment; and if... facility in good repair and in an attractive condition and replace worn-out or obsolete equipment, or...
NASA Technical Reports Server (NTRS)
1986-01-01
SuperSpan RM 8000 is an anti-corrosion coating which effectively counteracts acid degradation, abrasive wear, and cracking in power industry facilities. It was developed by RM Industrial Products Company, Inc. with NERAC assistance. It had previously been necessary to shut down plants to repair or replace corroded duct-work in coal burning utilities. NASA-developed technology was especially useful in areas relating to thermoconductivity of carbon steel and the bonding characteristics of polymers. The product has sold well.
NASA Technical Reports Server (NTRS)
Purves, Lloyd R. (Inventor)
1992-01-01
A robot serviced space facility includes multiple modules which are identical in physical structure, but selectively differing in function. and purpose. Each module includes multiple like attachment points which are identically placed on each module so as to permit interconnection with immediately adjacent modules. Connection is made through like outwardly extending flange assemblies having identical male and female configurations for interconnecting to and locking to a complementary side of another flange. Multiple rows of interconnected modules permit force, fluid, data and power transfer to be accomplished by redundant circuit paths. Redundant modules of critical subsystems are included. Redundancy of modules and of interconnections results in a space complex with any module being removable upon demand, either for module replacement or facility reconfiguration. without eliminating any vital functions of the complex. Module replacement and facility assembly or reconfiguration are accomplished by a computer controlled articulated walker type robotic manipulator arm assembly having two identical end-effectors in the form of male configurations which are identical to those on module flanges and which interconnect to female configurations on other flanges. The robotic arm assembly moves along a connected set or modules by successively disconnecting, moving and reconnecting alternate ends of itself to a succession of flanges in a walking type maneuver. To transport a module, the robot keeps the transported module attached to one of its end-effectors and uses another flange male configuration of the attached module as a substitute end-effector during walking.
NASA Astrophysics Data System (ADS)
Sorbom, Brandon; Ball, Justin; Palmer, Timothy; Mangiarotti, Franco; Sierchio, Jennifer; Bonoli, Paul; Kasten, Cale; Sutherland, Derek; Barnard, Harold; Haakonsen, Christian; Goh, Jon; Sung, Choongki; Whyte, Dennis
2014-10-01
The Affordable, Robust, Compact (ARC) reactor conceptual design aims to reduce the size, cost, and complexity of a combined Fusion Nuclear Science Facility (FNSF) and demonstration fusion pilot power plant. ARC is a 270 MWe tokamak reactor with a major radius of 3.3 m, a minor radius of 1.1 m, and an on-axis magnetic field of 9.2 T. ARC has Rare Earth Barium Copper Oxide (REBCO) superconducting toroidal field coils with joints to allow disassembly, allowing for removal and replacement of the vacuum vessel as a single component. Inboard-launched current drive of 25 MW LHRF power and 13.6 MW ICRF power is used to provide a robust, steady state core plasma far from disruptive limits. ARC uses an all-liquid blanket, consisting of low pressure, slowly flowing Fluorine Lithium Beryllium (FLiBe) molten salt. The liquid blanket acts as a working fluid, coolant, and tritium breeder, and minimizes the solid material that can become activated. The large temperature range over which FLiBe is liquid permits blanket operation at 800-900 K with single phase fluid cooling and allows use of a high-efficiency Brayton cycle for electricity production in the secondary coolant loop.
Proctor and gamble technology process assessment for bioenergy production
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hu, Hongqiang; Boardman, Richard Doin; Wright, Christopher Todd
P&G intends to replace as much as their current heat and power by renewable energy sources. For 2014, P&G’s total energy including electricity, natural gas and steam is approximately 1,540,000 MMBTU annually (Table 2). The biomass and wastes around P&G facility can be grouped into six categories (Figure 6): (1) Agriculture residue and grass, (2) Refuse (inorganic) solid material, (3) Food waste, (4) Organic waste stream, (5) livestock manure, (6) wastewater and sludge. The six feedstock sources can provide a total energy of 3,520,000 MMBTU per year (Table 10), among which the agriculture residue is the biggest fraction, about 67%,more » followed by livestock manures 27%. Therefore, the available energy sources around P&G facility are enough to meet their energy needs. These energy feedstocks would be treated by two processes: anaerobic digestion for biogas subsequently for heat and power and thermochemical process (combustion, pyrolysis and gasification) for heat and power (Figure 8 and 9). For AD, a one-stage complete mixing digester is preferable; and fluidized bed reactors are favorable for thermochemical process.« less
Operation of large RF sources for H-: Lessons learned at ELISE
NASA Astrophysics Data System (ADS)
Fantz, U.; Wünderlich, D.; Heinemann, B.; Kraus, W.; Riedl, R.
2017-08-01
The goal of the ELISE test facility is to demonstrate that large RF-driven negative ion sources (1 × 1 m2 source area with 360 kW installed RF power) can achieve the parameters required for the ITER beam sources in terms of current densities and beam homogeneity at a filling pressure of 0.3 Pa for pulse lengths of up to one hour. With the experience in operation of the test facility, the beam source inspection and maintenance as well as with the results of the achieved source performance so far, conclusions are drawn for commissioning and operation of the ITER beam sources. Addressed are critical technical RF issues, extrapolations to the required RF power, Cs consumption and Cs ovens, the need of adjusting the magnetic filter field strength as well as the temporal dynamic and spatial asymmetry of the co-extracted electron current. It is proposed to relax the low pressure limit to 0.4 Pa and to replace the fixed electron-to-ion ratio by a power density limit for the extraction grid. This would be highly beneficial for controlling the co-extracted electrons.
44 CFR 206.226 - Restoration of damaged facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... original site will be approved, except those facilities which facilitate an open space use in accordance... replacement items. (i) Library books and publications. Replacement of library books and publications is based...
44 CFR 206.226 - Restoration of damaged facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... original site will be approved, except those facilities which facilitate an open space use in accordance... replacement items. (i) Library books and publications. Replacement of library books and publications is based...
Design of a Glenn Research Center Solar Field Grid-Tied Photovoltaic Power System
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2009-01-01
The NASA Glenn Research Center (GRC) designed, developed, and installed, a 37.5 kW DC photovoltaic (PV) Solar Field in the GRC West Area in the 1970s for the purpose of testing PV panels for various space and terrestrial applications. The PV panels are arranged to provide a nominal 120 VDC. The GRC Solar Field has been extremely successful in meeting its mission. The PV panels and the supporting electrical systems are all near their end of life. GRC has designed a 72 kW DC grid-tied PV power system to replace the existing GRC West Area Solar Field. The 72 kW DC grid-tied PV power system will provide DC solar power for GRC PV testing applications, and provide AC facility power for all times that research power is not required. A grid-tied system is connected directly to the utility distribution grid. Facility power can be obtained from the utility system as normal. The PV system is synchronized with the utility system to provide power for the facility, and excess power is provided to the utility for use by all. The project transfers space technology to terrestrial use via nontraditional partners. GRC personnel glean valuable experience with PV power systems that are directly applicable to various space power systems, and provide valuable space program test data. PV power systems help to reduce harmful emissions and reduce the Nation s dependence on fossil fuels. Power generated by the PV system reduces the GRC utility demand, and the surplus power aids the community. Present global energy concerns reinforce the need for the development of alternative energy systems. Modern PV panels are readily available, reliable, efficient, and economical with a life expectancy of at least 25 years. Modern electronics has been the enabling technology behind grid-tied power systems, making them safe, reliable, efficient, and economical with a life expectancy of at least 25 years. The report concludes that the GRC West Area grid-tied PV power system design is viable for a reliable, maintenance free, long life power system that is of significant value to NASA and the community.
Potentiality Prediction of Electric Power Replacement Based on Power Market Development Strategy
NASA Astrophysics Data System (ADS)
Miao, Bo; Yang, Shuo; Liu, Qiang; Lin, Jingyi; Zhao, Le; Liu, Chang; Li, Bin
2017-05-01
The application of electric power replacement plays an important role in promoting the development of energy conservation and emission reduction in our country. To exploit the potentiality of regional electric power replacement, the regional GDP (gross domestic product) and energy consumption are taken as potentiality evaluation indicators. The principal component factors are extracted with PCA (principal component analysis), and the integral potentiality analysis is made to the potentiality of electric power replacement in the national various regions; a region is taken as a research object, and the potentiality of electric power replacement is defined and quantified. The analytical model for the potentiality of multi-scenario electric power replacement is developed, and prediction is made to the energy consumption with the grey prediction model. The relevant theoretical research is utilized to realize prediction analysis on the potentiality amount of multi-scenario electric power replacement.
77 FR 46767 - Plantings Associated with Eligible Facilities (RP9524.5)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
... for replacement of grass and sod associated with facilities eligible for repair and restoration. Limited instances when plantings are eligible include grass and sod replacement if it is an integral part...
NASA Astrophysics Data System (ADS)
Jadhav, Harsharaj S.; Kalubarme, Ramchandra S.; Park, Choong-Nyeon; Kim, Jaekook; Park, Chan-Jin
2014-08-01
To fulfill the high power and high energy density demands for Li-ion batteries (LIBs) new anode materials need to be explored to replace conventional graphite. Herein, we report the urea assisted facile co-precipitation synthesis of spinel NiCo2O4 and its application as an anode material for LIBs. The synthesized NiCo2O4 exhibited an urchin-like microstructure and polycrystalline and mesoporous nature. In addition, the mesoporous NiCo2O4 electrode exhibited an initial discharge capacity of 1095 mA h g-1 and maintained a reversible capacity of 1000 mA h g-1 for 400 cycles at 0.5 C-rate. The reversible capacity of NiCo2O4 could still be maintained at 718 mA h g-1, even at 10 C. The mesoporous NiCo2O4 exhibits great potential as an anode material for LIBs with the advantages of unique performance and facile preparation.To fulfill the high power and high energy density demands for Li-ion batteries (LIBs) new anode materials need to be explored to replace conventional graphite. Herein, we report the urea assisted facile co-precipitation synthesis of spinel NiCo2O4 and its application as an anode material for LIBs. The synthesized NiCo2O4 exhibited an urchin-like microstructure and polycrystalline and mesoporous nature. In addition, the mesoporous NiCo2O4 electrode exhibited an initial discharge capacity of 1095 mA h g-1 and maintained a reversible capacity of 1000 mA h g-1 for 400 cycles at 0.5 C-rate. The reversible capacity of NiCo2O4 could still be maintained at 718 mA h g-1, even at 10 C. The mesoporous NiCo2O4 exhibits great potential as an anode material for LIBs with the advantages of unique performance and facile preparation. Electronic supplementary information (ESI) available: Experimental details and additional experimental results. See DOI: 10.1039/c4nr02183e
Re-development of the Mount Evans Womble Observatory
NASA Astrophysics Data System (ADS)
Stencel, Robert E.
2017-01-01
Mount Evans in the Colorado Front Range hosts one of the highest altitude observatories in the USA, at an elevation of 14,148 ft (4,312 m). The observatory is operated under a Forest Service use permit, recently renewed for another 30 years. At times, observing conditions (seeing, water vapor column, etc.) can be as good as anywhere. The existing twin 0.72 m f/21 R-C telescopes are solar powered and internet connected. However, jet stream winds in 2012 destroyed the 15 year old, 22.5 ft diameter Ash dome. The replacement, custom dome design/install was rushed, and suffers from a number of flaws. Given that, plus the aging telescope and operating system, we are planning, and seeking partners and investor funds, to re-develop the facility. Facets of this may include replacing the twin apertures with a single full-aperture telescope for remote operations and sky monitoring, replacing the flawed dome with an innovative dome design, renewable power upgrades, and outreach programs for the many thousands of mountain visitors seasonally. As elsewhere, we are grappling with increases in atmospheric water vapor and out-of-control regional light pollution growth, but believe that the site continues to hold great potential. Interested parties are invited to contact the first author for further information. Website: http://www.du.edu/~rstencel/MtEvans .
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jahnke, Fred C.
FuelCell Energy and ACuPowder investigated and demonstrated the use of waste anode exhaust gas from a high temperature fuel cell for replacing the reducing gas in a metal processing furnace. Currently companies purchase high pressure or liquefied gases for the reducing gas which requires substantial energy in production, compression/liquefaction, and transportation, all of which is eliminated by on-site use of anode exhaust gas as reducing gas. We performed research on the impact of the gas composition on product quality and then demonstrated at FuelCell Energy’s manufacturing facility in Torrington, Connecticut. This demonstration project continues to operate even though the researchmore » program is completed as it provides substantial benefits to the manufacturing facility by supplying power, heat, and hydrogen.« less
Facility S 372, replacement dolphins and ramp from upper deck ...
Facility S 372, replacement dolphins and ramp from upper deck of ferry boat (YFB 87). - U.S. Naval Base, Pearl Harbor, Ferry Landing Type, Halawa Landing on Ford Island, Pearl City, Honolulu County, HI
2001-11-27
KENNEDY SPACE CENTER, Fla. -- In the Vertical Processing Facility, members of the STS-109 crew look over the Solar Array 3 panels that will be replacing Solar Array 2 panels on the Hubble Space Telescope (HST). Trainers, at left, point to the panels while Mission Specialist Nancy Currie (second from right) and Commander Scott Altman (far right) look on. Other crew members are Pilot Duane Carey, Payload Commander John Grunsfeld and Mission Specialists James Newman, Richard Linnehan and Michael Massimino. The other goals of the mission are replacing the Power Control Unit, removing the Faint Object Camera and installing the Advanced Camera for Surveys, installing the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) Cooling System, and installing New Outer Blanket Layer insulation on bays 5 through 8. Mission STS-109 is scheduled for launch Feb. 14, 2002
Southeastern Power Administration 2007 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2007-12-28
Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our naturalmore » and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator« less
Facility 596, detail of ramp from below, with replacement sheetpile ...
Facility 596, detail of ramp from below, with replacement sheet-pile dolphin on right and southernmost dolphins in background. - U.S. Naval Base, Pearl Harbor, Ferry Landing Type, Halawa Landing on Ford Island, Pearl City, Honolulu County, HI
2004-07-15
KENNEDY SPACE CENTER, FLA. - Unpacking of the Pump Flow Control Subsystem (PFCS) begins in the Space Station Processing Facility. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. Its solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
2004-07-15
KENNEDY SPACE CENTER, FLA. - Technicians attach a crane to the Pump Flow Control Subsystem (PFCS) in the Space Station Processing Facility. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. Its solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
Replacement of SSE with NASA's POWER Project GIS-enabled Web Data Portal
Atmospheric Science Data Center
2018-04-30
Replacement of SSE with NASA's POWER Project GIS-enabled Web Data Portal Friday, March ... 2018 Replacement of SSE (Release 6) with NASA's Prediction of Worldwide Energy Resource (POWER) Project GIS-enabled Web ... Worldwide Energy Resource (POWER) Project funded largely by NASA Earth Applied Sciences program. The new POWER web portal ...
1965-10-22
N-222; 2 x 2ft Transonic Wind Tunnel is a closed return, variable-density tunnel equipped with an adjustable flexible-wall nozzle and a slotted test section. Airflow is produced by a two-stage, axial-flow compressor powered by four, variable-speed induction motors mounted in tandem, delivering a total of 4,000 horsepower. For conventional, steady-state testing models are generally supported on a sting. Internal, strain-gage balances are used for measuring forces and moments. This facility is also used for panel-flutter testing (one test-section wall is replaced with another containing the test specimen.
International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test
NASA Technical Reports Server (NTRS)
Dalton, Penni J.; North, Tim
2017-01-01
In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.
76 FR 18191 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... action would be effective without further notice on May 2, 2011 unless comments are received which result... replace with ``DMDC 10 DoD.'' * * * * * System location: Delete entry and replace with ``Defense Manpower... facilities or using facilities interfacing with Defense Manpower Data Center Physical Access Control Systems...
A Study of Selected Issues in Military Construction and Base Operating Support
1986-12-01
and poten- tial, of data reported annually on the readiness of Navy shore base facilities * Development of a statistical model for forecasting the...of replacing or modernizing existing facilities * Study of the set of activities--including retail supply operations, bachelor housing, automated data ...until data from FY 1986 can be obtained and I SECTION 2 CAPITAL FACILITIES : AGING, REPLACEMENT, AND CHANGE OVER TIME During development of the POM, OP
2004-07-15
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Tracy Caldwell (left) assists a technician check out the Pump Flow Control Subsystem (PFCS) before it is installed on the upper deck of the S6 Truss. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. The solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
2004-07-15
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Tracy Caldwell (second from left) assists technicians position the Pump Flow Control Subsystem (PFCS) over the upper deck of the S6 Truss. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. Its solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
2004-07-15
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, a technician steadies the Pump Flow Control Subsystem (PFCS) as it is lifted and moved toward the S6 Truss. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. Its solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
2004-07-15
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Tracy Caldwell (second from left) assists technicians lower the Pump Flow Control Subsystem (PFCS) into position onto the upper deck of the S6 Truss. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. Its solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
2004-07-15
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, astronaut Tracy Caldwell (left) assists technicians install the Pump Flow Control Subsystem (PFCS) onto the upper deck of the S6 Truss. The PFCS pumps and controls the liquid ammonia used to cool the various Orbital Replacement Units on the Integrated Equipment Assembly that make up the S6 Photo-Voltaic Power Module on the International Space Station (ISS). The fourth starboard truss segment, the S6 Truss measures 112 feet long by 39 feet wide. Its solar arrays are mounted on a “blanket” that can be folded like an accordion for delivery to the ISS. Once in orbit, astronauts will deploy the blankets to their full size. When completed, the Station's electrical power system (EPS) will use eight photovoltaic solar arrays to convert sunlight to electricity. Delivery of the S6 Truss, the last power module truss segment, is targeted for mission STS-119.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... buildings (Buildings 2, 4, 6, 7, and 8) and construction of a single 5-story replacement facility in the... clinics; incorporate evidence-based design; include expansion of technology; and allow for operational... regulation. 2. MFD--demolition of five hospital buildings, construction of a single 5-story replacement...
Conceptual design of 100 TW solid state laser system
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMordie, J.A.
1995-12-31
Currently the main solid state laser facilities used for plasma physics research in the United Kingdom are the VULCAN laser at the Rutherford Appleton Laboratory and the HELEN facility at the Atomic Weapons Establishment. In the future it is proposed to replace HELEN with a new 100 TW facility to come on line early in the next century. A brief review is given of the VULCAN and HELEN. Then the authors discuss the design for the HELEN replacement.
Tian, Wenqiang; DeJong, Gerben; Horn, Susan D; Putman, Koen; Hsieh, Ching-Hui; DaVanzo, Joan E
2012-01-01
There has been lengthy debate as to which setting, skilled nursing facility (SNF) or inpatient rehabilitation facility (IRF), is more efficient in treating joint replacement patients. This study aims to determine the efficiency of rehabilitation care provided by SNF and IRF to joint replacement patients with respect to both payment and length of stay (LOS). This study used a prospective multisite observational cohort design. Tobit models were used to examine the association between setting of care and efficiency. The study enrolled 948 knee replacement patients and 618 hip replacement patients from 11 IRFs and 7 SNFs between February 2006 and February 2007. Output was measured by motor functional independence measure (FIM) score at discharge. Efficiency was measured in 3 ways: payment efficiency, LOS efficiency, and stochastic frontier analysis efficiency. IRF patients incurred higher expenditures per case but also achieved larger motor FIM gains in shorter LOS than did SNF patients. Setting of care was not a strong predictor of overall efficiency of rehabilitation care. Great variation in characteristics existed within IRFs or SNFs and severity groups. Medium-volume facilities among both SNFs and IRFs were most efficient. Early rehabilitation was consistently predictive of efficient treatment. The advantage of either setting is not clear-cut. Definition of efficiency depends in part on preference between cost and time. SNFs are more payment efficient; IRFs are more LOS efficient. Variation within SNFs and IRFs blurred setting differences; a simple comparison between SNF and IRF may not be appropriate.
Passive Safety Features Evaluation of KIPT Neutron Source Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhong, Zhaopeng; Gohar, Yousry
2016-06-01
Argonne National Laboratory (ANL) of the United States and Kharkov Institute of Physics and Technology (KIPT) of Ukraine have cooperated on the development, design, and construction of a neutron source facility. The facility was constructed at Kharkov, Ukraine and its commissioning process is underway. It will be used to conduct basic and applied nuclear research, produce medical isotopes, and train young nuclear specialists. The facility has an electron accelerator-driven subcritical assembly. The electron beam power is 100 kW using 100 MeV electrons. Tungsten or natural uranium is the target material for generating neutrons driving the subcritical assembly. The subcritical assemblymore » is composed of WWR-M2 - Russian fuel assemblies with U-235 enrichment of 19.7 wt%, surrounded by beryllium reflector assembles and graphite blocks. The subcritical assembly is seated in a water tank, which is a part of the primary cooling loop. During normal operation, the water coolant operates at room temperature and the total facility power is ~300 KW. The passive safety features of the facility are discussed in in this study. Monte Carlo computer code MCNPX was utilized in the analyses with ENDF/B-VII.0 nuclear data libraries. Negative reactivity temperature feedback was consistently observed, which is important for the facility safety performance. Due to the design of WWR-M2 fuel assemblies, slight water temperature increase and the corresponding water density decrease produce large reactivity drop, which offset the reactivity gain by mistakenly loading an additional fuel assembly. The increase of fuel temperature also causes sufficiently large reactivity decrease. This enhances the facility safety performance because fuel temperature increase provides prompt negative reactivity feedback. The reactivity variation due to an empty fuel position filled by water during the fuel loading process is examined. Also, the loading mistakes of removing beryllium reflector assemblies and replacing them with dummy assemblies were analyzed. In all these circumstances, the reactivity change results do not cause any safety concerns.« less
Brazil upgrades microwave system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newman, H.S.; Gomes, H.P.
1979-02-01
To provide communications facilities necessary during major construction projects, and for the operation and control of the expanding electric-power network, in 1967 Furnas-Centrais Eletricas SA, Brazil, started installing the first 22 links of its microwave system, from the Botafogo plant in Rio de Janeiro to the Furnas hydro station, and from the Furnas hydro station, southwest, to the Guarulhos plant in Sao Paulo and northwest to the Estreito hydro plant. To accommodate the construction of additional hydroelectric facilities, the second and third microwave-system expansions added nine links from Estreito hydro, northwest, to Marimbondo hydro and 7 links to Itumbiara. Themore » fourth expansion included two links to connect with the Angra dos Reis nuclear generating plant. A modern SCADA system replaced an earlier fault-reporting method, and a means of monitoring performance communications was established.« less
ORATOS: ESA's future flight dynamics operations system
NASA Astrophysics Data System (ADS)
Dreger, Frank; Fertig, Juergen; Muench, Rolf
The Orbit and Attitude Operations System (ORATOS -- the European Space Agency's future orbit and attitude operations system -- will be in use from the mid-nineties until well beyond the year 2000. The ORATOS design is based on the experience from flight dynamics support to all past ESA missions. The ORATOS computer hardware consists of a network of powerful UNIX workstations. ORATOS resides on several hardware platforms, each comprising one or more fileservers, several client workstations and the associated communications interface hardware. The ORATOS software is structured into three layers. The flight dynamics applications layer, the support layer and the operating system layer. This architectural design separates the flight dynamics application software from the support tools and operating system facilities. It allows upgrading and replacement of operating system facilities with a minimum (or no) effect on the application layer.
Construction of low-cost, Mod-OA wood composite wind turbine blades
NASA Technical Reports Server (NTRS)
Lark, R. F.
1983-01-01
Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.
Simulation of a Flywheel Electrical System for Aerospace Applications
NASA Technical Reports Server (NTRS)
Truong, Long V.; Wolff, Frederick J.; Dravid, Narayan V.
2000-01-01
A Flywheel Energy Storage Demonstration Project was initiated at the NASA Glenn Research Center as a possible replacement for the battery energy storage system on the International Space Station (ISS). While the hardware fabrication work was being performed at a university and contractor's facility, the related simulation activity was begun at Glenn. At the top level, Glenn researchers simulated the operation of the ISS primary electrical system (as described in another paper) with the Flywheel Energy Storage Unit (FESU) replacing one Battery Charge and Discharge Unit (BCDU). The FESU consists of a Permanent Magnet Synchronous Motor/Generator (PMSM), which is connected to the flywheel; the power electronics that connects the PMSM to the ISS direct-current bus; and the associated controller. The PMSM model is still under development, but this paper describes the rest of the FESU model-the simulation of the converter and the associated control system that regulates energy transfer to and from the flywheel.
NASA Astrophysics Data System (ADS)
Teitelbaum, L.; Liou, R.; Vodonos, Y.; Velazco, J.; Andrews, K.; Kelley, D.
2017-08-01
The Goldstone Solar System Radar (GSSR) is one of the world's great planetary radar facilities. The heart of the GSSR is its high-power transmitter, which radiates 450 kW from DSS-14, the Deep Space Network's 70-m antenna at Goldstone, by combining the output from two 250-kW klystrons. Klystrons are vacuum tube electron beam devices that are the key amplifying elements of most radio frequency telecommunications and radar transmitter systems. NASA's Science Mission Directorate sponsored the development of a new design for a 250-kW power, 50-MHz bandwidth, reliable klystron, intended to replace the aging operational devices that were developed in the mid-1990s. The design, developed in partnership with Communications & Power Industries, was verified by implementing and testing a first article prototype, the engineering model. Key elements of the design are new beam optics and focusing magnet, a seven-cavity RF body, and a modern collector able to reliably dissipate the full power of the electron beam. The first klystron based on the new VKX-7864C design was delivered to the DSN High-Power Transmitter Test Facility on November 1, 2016, the culmination of a six-year effort initiated to explore higher-resolution imaging of potentially hazardous near-Earth asteroids. The new design met or exceeded all requirements, including supporting advanced GSSR ranging modulations. The first article prototype was placed into operational service on July 26, 2017, after failure of one of the older klystrons, restoring the GSSR to full-power operations.
NASA Technical Reports Server (NTRS)
Burns, H. D.; Mitchell, M. A.; McMillian, J. H.; Farner, B. R.; Harper, S. A.; Peralta, S. F.; Lowrey, N. M.; Ross, H. R.; Juarez, A.
2015-01-01
Since the 1990's, NASA's rocket propulsion test facilities at Marshall Space Flight Center (MSFC) and Stennis Space Center (SSC) have used hydrochlorofluorocarbon-225 (HCFC-225), a Class II ozone-depleting substance, to safety clean and verify the cleanliness of large scale propulsion oxygen systems and associated test facilities. In 2012 through 2014, test laboratories at MSFC, SSC, and Johnson Space Center-White Sands Test Facility collaborated to seek out, test, and qualify an environmentally preferred replacement for HCFC-225. Candidate solvents were selected, a test plan was developed, and the products were tested for materials compatibility, oxygen compatibility, cleaning effectiveness, and suitability for use in cleanliness verification and field cleaning operations. Honewell Soltice (TradeMark) Performance Fluid (trans-1-chloro-3,3, 3-trifluoropropene) was selected to replace HCFC-225 at NASA's MSFC and SSC rocket propulsion test facilities.
Replacing coal with natural gas would reduce warming
NASA Astrophysics Data System (ADS)
Schultz, Colin
2012-08-01
A debate has raged in the past couple of years as to whether natural gas is better or worse overall than coal and oil from a global warming perspective. The back-and-forth findings have been due to the timelines taken into consideration, the details of natural gas extraction, and the electricity-generating efficiency of various fuels. An analysis by Cathles, which focuses exclusively on potential warming and ignores secondary considerations, such as economic, political, or other environmental concerns, finds that natural gas is better for electricity generation than coal and oil under all realistic circumstances. To come to this conclusion, the author considered three different future fuel consumption scenarios: (1) a business-as-usual case, which sees energy generation capacity continue at its current pace with its current energy mix until the middle of the century, at which point the implementation of low-carbon energy sources dominates and fossil fuel-derived energy production declines; (2) a gas substitution scenario, where natural gas replaces all coal power production and any new oil-powered facilities, with the same midcentury shift; and (3) a low-carbon scenario, where all electricity generation is immediately and aggressively switched to non-fossil fuel sources such as solar, wind, and nuclear.
New uses of position-sensitive photomultiplier tubes
NASA Astrophysics Data System (ADS)
Gordon, Jeffrey S.; Redus, Robert H.; Nagarkar, Vivek V.; Squillante, Michael R.
1992-12-01
Recent advances in photomultiplier tube technology have led to the availability of position sensitive photomultiplier tubes (PSPMTs). These tubes make it possible to build a new generation of imaging instruments for gamma rays and other types of ionizing radiation. We have investigated the use of these tubes for the construction of several prototype instruments. The first application investigated measures the quantity and distribution of radioactive compounds on filter papers used in microbiology research. The intent of this instrument is to replace film autoradiography with an electronic imaging system which can analyze samples 75 to 110 times faster than film. The second application involved the development of an intraoperative imaging probe to help surgeons identify cancerous tissue and ensure its complete removal. This instrument will replace a non-imaging probe now in use at many hospitals. A third prototype instrument under evaluation is an imaging nuclear survey system which obtains both a video and gamma ray image for the purpose of locating and quantifying radioactive materials. This system would be used at nuclear power plants and radioactive materials preparation facilities. A modification of this system could be built into robots used for inspecting and repairing power plants.
An Assessment of Capital Budgeting Practices for Public Higher Education
ERIC Educational Resources Information Center
Manns, Derrick
2004-01-01
The capital renewal and replacement of the nation's public higher education facilities has been a growing problem for several decades. While the need for new and improved facilities has increased over the years, many campuses simply have too many aging infrastructures that are too costly to replace. This, at a time when we have less than …
Munin, Michael C; Putman, Koen; Hsieh, Ching-Hui; Smout, Randall J; Tian, Wenqiang; DeJong, Gerben; Horn, Susan D
2010-07-01
To characterize rehabilitation services in two types of postacute facilities in patients who underwent hip replacement following a hip fracture. Multisite prospective observational cohort from 6 freestanding skilled nursing facilities and 11 inpatient rehabilitation facilities. Patients (n = 218) with hip fracture who had either hemiarthroplasty or total hip arthroplasty followed by rehabilitation at skilled nursing facilities or inpatient rehabilitation facilities were enrolled. Using a point-of-care methodology, we recorded data from actual physical therapy and occupational therapy sessions completed including functional outcomes during the postacute admission. Onset time from surgical repair to rehabilitation admission was not significantly different between sites. Average skilled nursing facilities length of stay was 24.7 +/- 13.6 days, whereas inpatient rehabilitation facilities was 13.0 +/- 5.7 days (P < 0.01). Total hours of physical therapy and occupational therapy services per patient day were 1.2 in skilled nursing facilities and 2.0 in inpatient rehabilitation facilities. For weekdays only, these data changed to 1.6 in skilled nursing facilities and 2.6 hrs per patient in inpatient rehabilitation facilities (P < 0.01). Patients in inpatient rehabilitation facilities accrued more time for gait training and exercise in physical therapy, which was found to be 48% and 40% greater, respectively, through day 8. In occupational therapy, patients of inpatient rehabilitation facilities had more time allocated to lower body dressing and transfers. Significant differences in rehabilitation activities were observed, and intensity was notably different within the first 8 therapy days even though baseline demographics and medical complexity were comparable across facility types. Our data suggest that after more complex hip replacement surgery, hip fracture patients can tolerate more intensive therapy earlier within the rehabilitation program.
Trade study comparing specimen chamber servicing methods for the Space Station Centrifuge Facility
NASA Technical Reports Server (NTRS)
Calvisi, Michael L.; Sun, Sidney C.
1991-01-01
The Specimen Chamber Service Unit, a component of the Space Station Centrifuge Facility, must provide a clean enclosure on a continuing basis for the facility's plant, rodent and primate specimens. The specimen chambers can become soiled and can require periodic servicing to maintain a clean environment for the specimens. Two methods of servicing the specimen chambers are discussed: washing the chambers with an on-board washer, or disposing of the soiled chambers and replacing them with clean ones. Many of these issues are addressed by developing several servicing options, using either cleaning or replacement as the method of providing clean specimen chambers, and then evaluating each option according to a set of established quantitative and qualitative criteria. Disposing and replacing the Specimen Chambers is preferable to washing them.
2006-01-11
KENNEDY SPACE CENTER, FLA. - In the Thermal Protection System Facility, Tim Wright, engineering manager with United Space Alliance, tests a new tile, called "Boeing replacement insulation" or "BRI-18." The new tiles will gradually replace older tiles around main landing gear doors, external tank doors and nose landing gear doors. Currently, 10 tiles have been processed inside the facility. Discovery will receive the first BRI-18 tiles. Technicians inside the Orbiter Processing Facility are performing fit checks and will begin bonding the tiles to the vehicle this month. The raw material is manufactured by The Boeing Company in Huntington Beach, Calif. Replacing older tile with the BRI-18 tile in strategic areas is one of the Columbia Accident Investigation Board's recommendations to strengthen the orbiters. The tiles are more impact resistant than previous designs, enhancing the crew’s safety.
2006-01-11
KENNEDY SPACE CENTER, FLA. - In the Thermal Protection System Facility, Tim Wright, engineering manager with United Space Alliance, tests a new tile, called "Boeing replacement insulation" or "BRI-18." The new tiles will gradually replace older tiles around main landing gear doors, external tank doors and nose landing gear doors. Currently, 10 tiles have been processed inside the facility. Discovery will receive the first BRI-18 tiles. Technicians inside the Orbiter Processing Facility are performing fit checks and will begin bonding the tiles to the vehicle this month. The raw material is manufactured by The Boeing Company in Huntington Beach, Calif. Replacing older tile with the BRI-18 tile in strategic areas is one of the Columbia Accident Investigation Board's recommendations to strengthen the orbiters. The tiles are more impact resistant than previous designs, enhancing the crew’s safety.
Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Donohue, John T.; Johnson, Chris; Ogden, Rick; Sushon, Janet
1998-01-01
The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.
18 CFR 2.55 - Definition of terms used in section 7(c).
Code of Federal Regulations, 2010 CFR
2010-04-01
... transmission facilities, then no notification is required; (ii) On, or at the same time as, certificated... at the same time as facilities that are proposed, then the auxiliary facilities must be described in... through the facilities; (ii) The replacement facilities will have a substantially equivalent designed...
18 CFR 2.55 - Definition of terms used in section 7(c).
Code of Federal Regulations, 2012 CFR
2012-04-01
... transmission facilities, then no notification is required; (ii) On, or at the same time as, certificated... at the same time as facilities that are proposed, then the auxiliary facilities must be described in... through the facilities; (ii) The replacement facilities will have a substantially equivalent designed...
18 CFR 2.55 - Definition of terms used in section 7(c).
Code of Federal Regulations, 2011 CFR
2011-04-01
... transmission facilities, then no notification is required; (ii) On, or at the same time as, certificated... at the same time as facilities that are proposed, then the auxiliary facilities must be described in... through the facilities; (ii) The replacement facilities will have a substantially equivalent designed...
1980-08-01
individual services. Furthermore, while historical workload statistics for the facility as a whole are available, individual services’ workload...the linear production function statistically fitted to workload data associated with these areas in order to determine the numbers of different...scheduled replacement hospital, this study was conducted to reveal that regardless of increased facility efficiency design, current manpower
Final Report: Assessment of Combined Heat and Power Premium Power Applications in California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Norwood, Zack; Lipman, Tim; Marnay, Chris
2008-09-30
This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a smallmore » fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the power generation system. Using the Distributed Energy Resource Customer Adoption Model (DER-CAM) developed at the Lawrence Berkeley National Laboratory, we model three representative scenarios and find the optimal operation scheduling, yearly energy cost, and energy technology investments for each scenario below: Scenario 1 - Diesel generators and CHP/CCHP equipment as installed in the current facility. Scenario 1 represents a baseline forced investment in currently installed energy equipment. Scenario 2 - Existing CHP equipment installed with blackout ride-through capability to replace approximately the same capacity of diesel generators. In Scenario 2 the cost of the replaced diesel units is saved, however additional capital cost for the controls and switchgear for blackout ride-through capability is necessary. Scenario 3 - Fully optimized site analysis, allowing DER-CAM to specify the number of diesel and CHP/CCHP units (with blackout ride-through capability) that should be installed ignoring any constraints on backup generation. Scenario 3 allows DER-CAM to optimize scheduling and number of generation units from the currently available technologies at a particular site. The results of this analysis, using real data to model the optimal schedulding of hypothetical and actual CHP systems for a brewery, data center, and hospital, lead to some interesting conclusions. First, facilities with high heating loads will typically prove to be the most appropriate for CHP installation from a purely economic standpoint. Second, absorption/adsorption cooling systems may only be economically feasible if the technology for these chillers can increase above current best system efficiency. At a coefficient of performance (COP) of 0.8, for instance, an adsorption chiller paired with a natural gas generator with waste heat recovery at a facility with large cooling loads, like a data center, will cost no less on a yearly basis than purchasing electricity and natural gas directly from a utility. Third, at marginal additional cost, if the reliability of CHP systems proves to be at least as high as diesel generators (which we expect to be the case), the CHP system could replace the diesel generator at little or no additional cost. This is true if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Last, in terms of greenhouse gas emissions, the modeled CHP and CCHP systems provide some degree of decreased emissions relative to systems with less CHP installed. The emission reduction can be up to 10% in the optimized case (Scenario 3) in the application with the highest relative thermal load, in this case the hospital. Although these results should be qualified because they are only based on the three case studies, the general results and lessons learned are expected to be applicable across a broad range of potential and existing CCHP systems.« less
Improvements and Performance of the Fermilab Solenoid Test Facility
Orris, Darryl; Arnold, Don; Brandt, Jeffrey; ...
2017-06-01
Here, the Solenoid Test Facility at Fermilab was built using a large vacuum vessel for testing of conduction-cooled superconducting solenoid magnets, and was first used to determine the performance of the MICE Coupling Coil. The facility was modified recently to enable testing of solenoid magnets for the Mu2e experiment, which operate at much higher current than the Coupling Coil. One pair of low current conduction-cooled copper and NbTi leads was replaced with two pairs of 10 kA HTS leads cooled by heat exchange with liquid nitrogen and liquid helium. The new design, with additional control and monitoring capability, also providesmore » helium cooling of the superconducting magnet leads by conduction. A high current power supply with energy extraction was added, and several improvements to the quench protection and characterization system were made. Here we present details of these changes and report on performance results from a test of the Mu2e prototype Transport Solenoid (TS) module. Progress on additional improvements in preparation for production TS module testing will be presented.« less
Improvements and Performance of the Fermilab Solenoid Test Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orris, Darryl; Arnold, Don; Brandt, Jeffrey
Here, the Solenoid Test Facility at Fermilab was built using a large vacuum vessel for testing of conduction-cooled superconducting solenoid magnets, and was first used to determine the performance of the MICE Coupling Coil. The facility was modified recently to enable testing of solenoid magnets for the Mu2e experiment, which operate at much higher current than the Coupling Coil. One pair of low current conduction-cooled copper and NbTi leads was replaced with two pairs of 10 kA HTS leads cooled by heat exchange with liquid nitrogen and liquid helium. The new design, with additional control and monitoring capability, also providesmore » helium cooling of the superconducting magnet leads by conduction. A high current power supply with energy extraction was added, and several improvements to the quench protection and characterization system were made. Here we present details of these changes and report on performance results from a test of the Mu2e prototype Transport Solenoid (TS) module. Progress on additional improvements in preparation for production TS module testing will be presented.« less
Producing more power from existing hydro resources
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connor, J.
1993-02-01
Rehabilitation is big business in the North American hydropower industry. Hydropower producers are replacing or rehabilitating turbines, uprating old hydro generators, and installing advanced control systems. Estimates indicate that as much as 15,000 MW of new electricall generating capacity can be obtained by rehabilitating existing hydro facilities. The cost of developing this capacity is far less than for building new power projects. In most rehabilitation projects, the existing dam, powerhouse, and access roads are retained; only new mechanical and electrica equipment is required. As a result, these projects often can be accomplished for about half the cost of developing amore » new thermal plant to provide an equivalent amount of capacity. This new power does not contribute to atmospheric pollution, cause increases in operations and maintenance costs, or create uncertainties about fuel sources. The Bureau of Reclamation, the Salt River Project, the New York Power Authority, and the Tennessee Valley Authority all are either in the midst of major hydro rehabilitation projects or gearing up for future work. This activity indicates a healthy market of hydro products and services for years to come.« less
A case study of collaborative facilities use in engineering design
NASA Astrophysics Data System (ADS)
Monroe, Laura; Pugmire, David
2010-01-01
In this paper we describe the use of visualization tools and facilities in the collaborative design of a replacement weapons system, the Reliable Replacement Warhead (RRW). We used not only standard collaboration methods but also a range of visualization software and facilities to bring together domain specialists from laboratories across the country to collaborate on the design and integrate this disparate input early in the design. This was the first time in U.S. weapons history that a weapon had been designed in this collaborative manner. Benefits included projected cost savings, design improvements and increased understanding across the project.
Infrared Heater Used in Qualification Testing of International Space Station Radiators
NASA Technical Reports Server (NTRS)
Ziemke, Robert A.
2004-01-01
Two heat rejection radiator systems for the International Space Station (ISS) have undergone thermal vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the Space Power Facility (SPF), the largest thermal vacuum chamber in the world. The heat rejection system radiator was tested first; it removes heat from the ISS crew living quarters. The second system tested was the photovoltaic radiator (PVR), which rejects heat from the ISS photovoltaic arrays and the electrical power-conditioning equipment. The testing included thermal cycling, hot- and cold-soaked deployments, thermal gradient deployments, verification of the onboard heater controls, and for the PVR, thermal performance tests with ammonia flow. Both radiator systems are orbital replacement units for ease of replacement on the ISS. One key to the success of these tests was the performance of the infrared heater system. It was used in conjunction with a gaseous-nitrogen-cooled cryoshroud in the SPF vacuum chamber to achieve the required thermal vacuum conditions for the qualification tests. The heater, which was designed specifically for these tests, was highly successful and easily met the test requirements. This report discusses the heating requirements, the heater design features, the design approach, and the mathematical basis of the design.
Troussel, Ph; Villette, B; Emprin, B; Oudot, G; Tassin, V; Bridou, F; Delmotte, F; Krumrey, M
2014-01-01
CEA implemented an absolutely calibrated broadband soft X-ray spectrometer called DMX on the Omega laser facility at the Laboratory for Laser Energetics (LLE) in 1999 to measure radiant power and spectral distribution of the radiation of the Au plasma. The DMX spectrometer is composed of 20 channels covering the spectral range from 50 eV to 20 keV. The channels for energies below 1.5 keV combine a mirror and a filter with a coaxial photo-emissive detector. For the channels above 5 keV the photoemissive detector is replaced by a conductive detector. The intermediate energy channels (1.5 keV < photon energy < 5 keV) use only a filter and a coaxial detector. A further improvement of DMX consists in flat-response X-ray channels for a precise absolute measurement of the photon flux in the photon energy range from 0.1 keV to 6 keV. Such channels are equipped with a filter, a Multilayer Mirror (MLM), and a coaxial detector. We present as an example the development of channel for the gold M emission lines in the photon energy range from 2 keV to 4 keV which has been successfully used on the OMEGA laser facility. The results of the radiant power measurements with the new MLM channel and with the usual channel composed of a thin titanium filter and a coaxial detector (without mirror) are compared. All elements of the channel have been calibrated in the laboratory of the Physikalisch-Technische Bundesanstalt, Germany's National Metrology Institute, at the synchrotron radiation facility BESSY II in Berlin using dedicated well established and validated methods.
49 CFR 228.101 - Distance requirement; definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... determined in accordance with rules prescribed by the Secretary of Transportation) of any area where railroad... of a new facility; (ii) Expansion of an existing facility; (iii) Placement of a mobile or modular...) Replacement of an existing facility with a new facility on the same site; or (ii) Rehabilitation or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, Lance G.
2000-09-01
A full scale, wellhead Biphase turbine was manufactured and installed with the balance of plant at Well 103 of the Cerro Prieto geothermal resource in Baja, California. The Biphase turbine was first synchronized with the electrical grid of Comision Federal de Electricidad on August 20, 1997. The Biphase power plant was operated from that time until May 23, 2000, a period of 2 years and 9 months. A total of 77,549 kWh were delivered to the grid. The power plant was subsequently placed in a standby condition pending replacement of the rotor with a newly designed, higher power rotor andmore » replacement of the bearings and seals. The maximum measured power output of the Biphase turbine, 808 kWe at 640 psig wellhead pressure, agreed closely with the predicted output, 840 kWe. When combined with the backpressure steam turbine the total output power from that flow would be increased by 40% above the power derived only from the flow by the present flash steam plant. The design relations used to predict performance and design the turbine were verified by these tests. The performance and durability of the Biphase turbine support the conclusion of the Economics and Application Report previously published, (Appendix A). The newly designed rotor (the Dual Pressure Rotor) was analyzed for the above power condition. The Dual Pressure Rotor would increase the power output to 2064 kWe by incorporating two pressure letdown stages in the Biphase rotor, eliminating the requirement for a backpressure steam turbine. The power plant availability was low due to deposition of solids from the well on the Biphase rotor and balance of plant problems. A great deal of plant down time resulted from the requirement to develop methods to handle the solids and from testing the apparatus in the Biphase turbine. Finally an online, washing method using the high pressure two-phase flow was developed which completely eliminated the solids problem. The availability of the Biphase turbine itself was 100% after implementations of this method in March 2000. However, failures of instrumentation and control system components led to additional plant down time and damage to the bearings and seals. The enthalpy and pressure of well 103 declined substantially from the inception of the project. When the project was started the wellhead pressure and enthalpy were 760 psig and 882 Btu/lb respectively. At the time the plant was placed in standby the corresponding values were only 525 psig and 658 Btu/lb. This reduced the available plant power to only 400 kWe making the project economically unfeasible. However, replacement of the existing rotor with the Dual Pressure Rotor and replacement of the bearings and seals will enable the existing Biphase turbine to produce 1190 kWe at the present well conditions without the backpressure steam turbine. Operation with the present staff can then be sustained by selling power under the existing Agreement with CFE. Implementation of this option is recommended with operation of the facility to continue as a demonstration plant. Biphase turbine theory, design and performance are reported herein. The construction of the Biphase turbine and power plant and operational experience are detailed. Improvements in the Biphase turbine are indicated and analyzed. The impact of Biphase techonology on geothermal power production is discussed and recommendations made.« less
Ion Diode Experiments on PBFA-X
NASA Astrophysics Data System (ADS)
Lockner, Thomas
1996-05-01
The PBFA-II pulsed power accelerator at Sandia National Laboratories has been modified to replace the radially focusing ion diode with an extraction ion diode. In the extraction diode mode (PBFA X) the ion beam is generated on the surface of an annular disk and extracted along the cylindrical axis. An additional magnetically insulated transmission line (MITL) has been installed to transmit power from the center to the bottom of the accelerator, where it drives a magnetically insulated extraction ion diode. The modification increases access to the diode and the diagnostics, permitting a higher shot rate, and allows us to study extraction diode technology at a power level near what is required for a high yield facility. The modification also includes reversing the polarity of the top half of the accelerator to permit operation at twice the previous source voltage. In the new configuration the diode could operate at 15 MV and 0.8 MA. This operating point is near the 30 MV, 1.0 MA operating point envisioned for one module of a high yield facility, and will allow the study of intense extraction ion diodes at power levels relevant to such a facility. Experimental results will be presented including MITL coupling studies, beam current density control, discharge cleaning of diode surfaces to reduce the presence of contaminant ions in the source beam, and the effect of anode substrate materials on the purity of the lithium beam. A comparison between predicted and measured radial beam profiles will also be presented, with the predicted profiles obtained from the ATHETA code that solves magnetostatics problems in two dimensions. This work was supported by the US/DOE under contract No. DE-AC04-94AL85000. +In collaboration with R. S. Coats, M. E. Cuneo, M. P. Desjarlias, D. J. Johnson, T. A. Mehlhorn, C. W. Mendel, Jr., P. Menge#, and W. J. Poukey,
Hurwitz, Anita Gupta; Farrow, Phillip R; Preer, Genevieve; Philipp, Barbara L
2014-06-01
The deleterious effect of formula company-sponsored discharge bags on breastfeeding is well established. As of July 2012, all 49 maternity facilities in Massachusetts had banned these bags, making it the second "bag-free" state in the United States. Obstacles to changing this long-standing practice were numerous, including concerns regarding the cost of a substitute gift. This study was designed to describe what practices maternity facilities in Massachusetts have adopted in place of giving out a formula company-sponsored discharge bag. Maternity facilities in Massachusetts were surveyed regarding discharge gift practices. Information was collected regarding gifts given and cost. The response rate was 100%. Fifty-nine percent of the facilities replaced the formula company-sponsored bag with their own gift bag carrying the hospital's logo. Bags were either given empty or contained educational materials and/or a gift such as a T-shirt, hat, or baby book. Fourteen percent of the facilities gave a gift that did not include a bag. Twenty-seven percent of facilities gave no gift. Cost of the gifts ranged from $1 to $35, with a mean cost of $10.67. The hospital budget was used to partially or fully fund 58% of gifts; 22% were covered in part by donations. Although most maternity facilities surveyed replaced the formula company-sponsored discharge bag with a different gift, one-quarter gave no replacement. These data indicate that discontinuing discharge gifts can be a readily accepted, cost-neutral step toward evidence-based breastfeeding best practice.
LIFE: a sustainable solution for developing safe, clean fusion power.
Reyes, Susana; Dunne, Mike; Kramer, Kevin; Anklam, Tom; Havstad, Mark; Mazuecos, Antonio Lafuente; Miles, Robin; Martinez-Frias, Joel; Deri, Bob
2013-06-01
The National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory (LLNL) in California is currently in operation with the goal to demonstrate fusion energy gain for the first time in the laboratory-also referred to as "ignition." Based on these demonstration experiments, the Laser Inertial Fusion Energy (LIFE) power plant is being designed at LLNL in partnership with other institutions with the goal to deliver baseload electricity from safe, secure, sustainable fusion power in a time scale that is consistent with the energy market needs. For this purpose, the LIFE design takes advantage of recent advances in diode-pumped, solid-state laser technology and adopts the paradigm of Line Replaceable Units used on the NIF to provide high levels of availability and maintainability and mitigate the need for advanced materials development. The LIFE market entry plant will demonstrate the feasibility of a closed fusion fuel cycle, including tritium breeding, extraction, processing, refueling, accountability, and safety, in a steady-state power-producing device. While many fusion plant designs require large quantities of tritium for startup and operations, a range of design choices made for the LIFE fuel cycle act to reduce the in-process tritium inventory. This paper presents an overview of the delivery plan and the preconceptual design of the LIFE facility with emphasis on the key safety design principles being adopted. In order to illustrate the favorable safety characteristics of the LIFE design, some initial accident analysis results are presented that indicate potential for a more attractive licensing regime than that of current fission reactors.
NASA Technical Reports Server (NTRS)
Giriunas, Julius A.
2012-01-01
Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... Abandonment and Replacement Project and Request for Comments on Environmental Issues February 5, 2010. The... Replacement Project, involving the abandonment and replacement of facilities by Southern Natural Gas Company... process to determine whether the project is in the public convenience and necessity. This notice announces...
Southeastern Power Administration 2012 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-01-01
Dear Secretary Moniz: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2012 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2011, and ending September 30, 2012. This past year, Southeastern marketed approximately 5.4 billion kilowatt-hours of energy to 487 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled about $263 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corpsmore » of Engineers (Corps) continued in FY 2012. Currently, there are more than 214 customers participating in funding infrastructure renewal efforts of powerplants feeding the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems. This funding, which totaled more than $71 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rainfall strained our natural and financial resources. Power purchases for FY 2012 in the Georgia-Alabama-South Carolina System totaled approximately $29 million. About $8 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast. Sincerely, Kenneth E. Legg Administrator« less
Lewis Research Center space station electric power system test facilities
NASA Technical Reports Server (NTRS)
Birchenough, Arthur G.; Martin, Donald F.
1988-01-01
NASA Lewis Research Center facilities were developed to support testing of the Space Station Electric Power System. The capabilities and plans for these facilities are described. The three facilities which are required in the Phase C/D testing, the Power Systems Facility, the Space Power Facility, and the EPS Simulation Lab, are described in detail. The responsibilities of NASA Lewis and outside groups in conducting tests are also discussed.
Natural hazard impact on the technosphere: "blackouts
NASA Astrophysics Data System (ADS)
Petrova, E. G.
2012-04-01
In recent years, natural-technological accidents (NTA) and disasters are increasing in their number and severity all over the world. The term "natural-technological accident (disaster)" applies for an accident (disaster) in the technosphere triggered by any natural process or phenomenon. Their growth is caused, on the one hand, by observed increasing in the frequency and intensity of some natural hazards and hazardous events due to climate change and, on the other hand, by a growing complication of the modern technosphere exposed to natural impacts and advancement of economic activities into the area at natural risk. The most large-scaled natural-technological disaster happened on March 11, 2011 in Japan, as a result of a massive earthquake and tsunami that caused a number of serious technological accidents, including accidents at "Fukushima-1" nuclear power plant, etc. Severe social, ecological and economic consequences of large-scaled NTA make investigation of these events especially important. The most frequent among NTA occurring in Russia are breakdowns in electric power supply systems that lead to so-called "blackouts" (accidental power outages). They are mainly caused by strong winds, snowstorms, deposition of ice, sleet, and snow, rainfalls, floods, and hailstones. Among other triggers earthquakes, hard frost, fierce heat, thunderstorms, landslides, snow avalanches, and debris flows should be mentioned. The great part of transmission facilities in Russia falls on overhead lines that are especially vulnerable to natural impacts. In general, natural triggers are responsible for more than 70 percent of all accidents in power supply systems. They occur more often in Far East, in the Southern and North-Western federal districts, and in some regions of the Central Russia, which are prone to hurricanes, cyclones, snowstorms, and heavy rainfalls accompanying by hailstones, icing, and sleet. A distinctive feature of these events is their synergistic nature, as power outages can cause a chain of other accidents at heat- and water supply, industrial plants, transport and communication facilities, producing so-called "domino effect". A modernization of facilities, replacement of overhead lines by underground cables and protection from falling trees can reduce the problem.
2009-03-03
CAPE CANAVERAL, Fla. – In the Astrotech payload processing facility in Titusville, Fla., the latest Geostationary Operational Environmental Satellite, or GOES, is lowered onto the floor. Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. The satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. Photo credit: NASA/Kim Shiflett
2009-03-03
CAPE CANAVERAL, Fla. – The latest Geostationary Operational Environmental Satellite, or GOES, is lifted from the transporter and moved into the Astrotech payload processing facility in Titusville, Fla. Developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA, the GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. The satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. Photo credit: NASA/Kim Shiflett
High temperature materials characterization
NASA Technical Reports Server (NTRS)
Workman, Gary L.
1990-01-01
A lab facility for measuring elastic moduli up to 1700 C was constructed and delivered. It was shown that the ultrasonic method can be used to determine elastic constants of materials from room temperature to their melting points. The ease in coupling high frequency acoustic energy is still a difficult task. Even now, new coupling materials and higher power ultrasonic pulsers are being suggested. The surface was only scratched in terms of showing the full capabilities of either technique used, especially since there is such a large learning curve in developing proper methodologies to take measurements into the high temperature region. The laser acoustic system does not seem to have sufficient precision at this time to replace the normal buffer rod methodology.
New Phone System Coming to NCI Campus at Frederick | Poster
By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current Avaya phone system with a Cisco Unified Communications phone system. The Cisco system is already in use at the Advanced Technology Research Facility (ATRF).
ERIC Educational Resources Information Center
Twenty-First Century School Fund, Washington, DC.
This report addresses the decision-making process for replacing or modernizing the District of Columbia Public Schools (DCPS) as proposed in the DCPS facility master plan. The three-section document discusses old and historic schools and their future; the schools' historical and architectural value; cost of replacement and modernization; design;…
78 FR 65690 - Trees and Plantings Associated With Eligible Facilities, RP9524.5
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
...] Trees and Plantings Associated With Eligible Facilities, RP9524.5 AGENCY: Federal Emergency Management... policy Trees and Plantings Associated with Eligible Facilities. The Federal Emergency Management Agency... trees, shrubs, and other plantings, including limited eligibility for replacement of grass and sod...
Code of Federal Regulations, 2011 CFR
2011-10-01
... (Replaces 100.1.1, 100.1.2, 122.1, 132 and 133). 56.01-3 Section 56.01-3 Shipping COAST GUARD, DEPARTMENT OF... boilers, external piping and appurtenances (Replaces 100.1.1, 100.1.2, 122.1, 132 and 133). (a) Power... appurtenances of power boilers, as defined in §§ 100.1.1 and 100.1.2, appearing in the various paragraphs of...
Code of Federal Regulations, 2010 CFR
2010-10-01
... (Replaces 100.1.1, 100.1.2, 122.1, 132 and 133). 56.01-3 Section 56.01-3 Shipping COAST GUARD, DEPARTMENT OF... boilers, external piping and appurtenances (Replaces 100.1.1, 100.1.2, 122.1, 132 and 133). (a) Power... appurtenances of power boilers, as defined in §§ 100.1.1 and 100.1.2, appearing in the various paragraphs of...
Summary Report for the C50 Cryomodule Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drury, Michael; Davis, G; Fischer, John
2011-03-01
The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons thatmore » produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.« less
NASA Technical Reports Server (NTRS)
Sydnor, George H.; Bhatia, Ram; Krattiger, Hansueli; Mylius, Justus; Schafer, D.
2012-01-01
In September 1995, a project was initiated to replace the existing drive line at NASA's most unique transonic wind tunnel, the National Transonic Facility (NTF), with a single 101 MW synchronous motor driven by a Load Commutated Inverter (LCI). This Adjustable Speed Drive (ASD) system also included a custom four-winding transformer, harmonic filter, exciter, switch gear, control system, and feeder cable. The complete system requirements and design details have previously been presented and published [1], as well as the commissioning and acceptance test results [2]. The NTF was returned to service in December 1997 with the new drive system powering the fan. Today, this installation still represents the world s largest horizontal single motor/drive combination. This paper describes some significant events that occurred with the drive system during the first 15 years of service. These noteworthy issues are analyzed and root causes presented. Improvements that have substantially increased the long term viability of the system are given.
Trust and British Gas partner in EPC scheme.
Bevan, Patrick
2015-02-01
In late August last year the St George's Healthcare NHS Trust in south-west London signed what the Trust's Estates and Facilities team described as 'a historic partnership' with British Gas for a £12 m Energy Performance Contract energy reduction scheme--via which the energy company has guaranteed to deliver £1.1 m in annual savings over the next 15 years. The agreement will see British Gas replace four 35-year-old gas-powered steam boilers and an ageing CHP plant in the boiler house at the Trust's main acute facility, the StGeorge's Hospital in Tooting, and upgrade some of the associated infrastructure. British Gas will also maintain the new plant to ensure that the projected savings are achieved while the Trust owns the new assets. The Trust should gain financially--via lower energy costs and carbon emissions, while estates personnel will be better able to complete the many other estate maintenance issues that would otherwise be contracted out at one of London's biggest acute hospitals.
EPA’s Permeable Pavement Research
A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...
40 CFR Appendix A to Part 20 - Guidelines for Certification
Code of Federal Regulations, 2010 CFR
2010-07-01
... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...
40 CFR Appendix A to Part 20 - Guidelines for Certification
Code of Federal Regulations, 2012 CFR
2012-07-01
... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...
40 CFR Appendix A to Part 20 - Guidelines for Certification
Code of Federal Regulations, 2011 CFR
2011-07-01
... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...
40 CFR Appendix A to Part 20 - Guidelines for Certification
Code of Federal Regulations, 2014 CFR
2014-07-01
... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...
40 CFR Appendix A to Part 20 - Guidelines for Certification
Code of Federal Regulations, 2013 CFR
2013-07-01
... that pollution control facilities must be used in connection with a plant or other property in... FACILITIES Pt. 20, App. A Appendix A to Part 20—Guidelines for Certification 1. General. 2. Air Pollution.... Air pollution control facility boundaries. c. Examples of eligibility limits. d. Replacement of...
Central Computational Facility CCF communications subsystem options
NASA Technical Reports Server (NTRS)
Hennigan, K. B.
1979-01-01
A MITRE study which investigated the communication options available to support both the remaining Central Computational Facility (CCF) computer systems and the proposed U1108 replacements is presented. The facilities utilized to link the remote user terminals with the CCF were analyzed and guidelines to provide more efficient communications were established.
NASA Astrophysics Data System (ADS)
Masuzawa, Tomoaki; Neo, Yoichiro; Mimura, Hidenori; Okamoto, Tamotsu; Nagao, Masayoshi; Akiyoshi, Masafumi; Sato, Nobuhiro; Takagi, Ikuji; Tsuji, Hiroshi; Gotoh, Yasuhito
2016-10-01
A growing demand on incident detection is recognized since the Great East Japan Earthquake and successive accidents in Fukushima nuclear power plant in 2011. Radiation tolerant image sensors are powerful tools to collect crucial information at initial stages of such incidents. However, semiconductor based image sensors such as CMOS and CCD have limited tolerance to radiation exposure. Image sensors used in nuclear facilities are conventional vacuum tubes using thermal cathodes, which have large size and high power consumption. In this study, we propose a compact image sensor composed of a CdTe-based photodiode and a matrix-driven Spindt-type electron beam source called field emitter array (FEA). A basic principle of FEA-based image sensors is similar to conventional Vidicon type camera tubes, but its electron source is replaced from a thermal cathode to FEA. The use of a field emitter as an electron source should enable significant size reduction while maintaining high radiation tolerance. Current researches on radiation tolerant FEAs and development of CdTe based photoconductive films will be presented.
NASA Technical Reports Server (NTRS)
Bragg-Sitton, Shannon M.; Hervol, David S.; Godfroy, Thomas J.
2009-01-01
A Direct Drive Gas-Cooled (DDG) reactor core simulator has been coupled to a Brayton Power Conversion Unit (BPCU) for integrated system testing at NASA Glenn Research Center (GRC) in Cleveland, OH. This is a closed-cycle system that incorporates an electrically heated reactor core module, turbo alternator, recuperator, and gas cooler. Nuclear fuel elements in the gas-cooled reactor design are replaced with electric resistance heaters to simulate the heat from nuclear fuel in the corresponding fast spectrum nuclear reactor. The thermodynamic transient behavior of the integrated system was the focus of this test series. In order to better mimic the integrated response of the nuclear-fueled system, a simulated reactivity feedback control loop was implemented. Core power was controlled by a point kinetics model in which the reactivity feedback was based on core temperature measurements; the neutron generation time and the temperature feedback coefficient are provided as model inputs. These dynamic system response tests demonstrate the overall capability of a non-nuclear test facility in assessing system integration issues and characterizing integrated system response times and response characteristics.
NASA Technical Reports Server (NTRS)
Bragg-Sitton, Shannon M.; Hervol, David S.; Godfroy, Thomas J.
2010-01-01
A Direct Drive Gas-Cooled (DDG) reactor core simulator has been coupled to a Brayton Power Conversion Unit (BPCU) for integrated system testing at NASA Glenn Research Center (GRC) in Cleveland, Ohio. This is a closed-cycle system that incorporates an electrically heated reactor core module, turboalternator, recuperator, and gas cooler. Nuclear fuel elements in the gas-cooled reactor design are replaced with electric resistance heaters to simulate the heat from nuclear fuel in the corresponding fast spectrum nuclear reactor. The thermodynamic transient behavior of the integrated system was the focus of this test series. In order to better mimic the integrated response of the nuclear-fueled system, a simulated reactivity feedback control loop was implemented. Core power was controlled by a point kinetics model in which the reactivity feedback was based on core temperature measurements; the neutron generation time and the temperature feedback coefficient are provided as model inputs. These dynamic system response tests demonstrate the overall capability of a non-nuclear test facility in assessing system integration issues and characterizing integrated system response times and response characteristics.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... facilities. List of Subjects in 18 CFR Part 292 Electric power, Electric power plants, Electric utilities... to Form, Procedures and Criteria for Certification of Qualifying Facility Status for a Small Power... small power production or cogeneration facility. DATES: August 16, 2011. FOR FURTHER INFORMATION CONTACT...
Replacement of SSE with NASA's POWER Announcement
Atmospheric Science Data Center
2018-06-11
... We are pleased to announce that on June 13, 2018 the old SSE web site will be replaced with the new data web portal at https://power.larc.nasa.gov with improved solar and ... currently on SSE are now available at the new POWER web site although the parameters might be organized differently. Also note ...
23 CFR 771.118 - FTA categorical exclusions
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...
23 CFR 771.118 - FTA categorical exclusions
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...
Code of Federal Regulations, 2013 CFR
2013-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Code of Federal Regulations, 2014 CFR
2014-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Code of Federal Regulations, 2012 CFR
2012-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Study on a hypothetical replacement of nuclear electricity by wind power in Sweden
NASA Astrophysics Data System (ADS)
Wagner, F.; Rachlew, E.
2016-05-01
The Swedish electricity supply system benefits strongly from the natural conditions which allow a high share of hydroelectricity. A complete supply is, however, not possible. Up to now, nuclear power is the other workhorse to serve the country with electricity. Thus, electricity production of Sweden is basically CO2 -free and Sweden has reached an environmental status which others in Europe plan to reach in 2050. Furthermore, there is an efficient exchange within the Nordic countries, Nordpol, which can ease possible capacity problems during dry cold years. In this study we investigate to what extent and with what consequences the base load supply of nuclear power can be replaced by intermittent wind power. Such a scenario leads unavoidably to high wind power installations. It is shown that hydroelectricity cannot completely smooth out the fluctuations of wind power and an additional back-up system using fossil fuel is necessary. From the operational dynamics, this system has to be based on gas. The back-up system cannot be replaced by a storage using surplus electricity from wind power. The surplus is too little. To overcome this, further strong extension of wind power is necessary which leads, however, to a reduction of the use of hydroelectricity if the annual consumption is kept constant. In this case one fossil-free energy form is replaced by another, however, more complex one. A mix of wind power at 22.3GW plus a gas based back-up system with 8.6GW producing together 64.8TWh would replace the present infrastructure with 9GW nuclear power producing 63.8TWh electricity. The specific CO2 -emission increases to the double in this case. Pumped storage for the exclusive supply of Sweden does not seem to be a meaningful investment.-1
NASA Astrophysics Data System (ADS)
Wallace, Brian D.
A series of field tests and theoretical analyses were performed on various wind turbine rotor designs at two Penn State residential-scale wind-electric facilities. This work involved the prediction and experimental measurement of the electrical and aerodynamic performance of three wind turbines; a 3 kW rated Whisper 175, 2.4 kW rated Skystream 3.7, and the Penn State designed Carolus wind turbine. Both the Skystream and Whisper 175 wind turbines are OEM blades which were originally installed at the facilities. The Carolus rotor is a carbon-fiber composite 2-bladed machine, designed and assembled at Penn State, with the intent of replacing the Whisper 175 rotor at the off-grid system. Rotor aerodynamic performance is modeled using WT_Perf, a National Renewable Energy Laboratory developed Blade Element Momentum theory based performance prediction code. Steady-state power curves are predicted by coupling experimentally determined electrical characteristics with the aerodynamic performance of the rotor simulated with WT_Perf. A dynamometer test stand is used to establish the electromechanical efficiencies of the wind-electric system generator. Through the coupling of WT_Perf and dynamometer test results, an aero-electro-mechanical analysis procedure is developed and provides accurate predictions of wind system performance. The analysis of three different wind turbines gives a comprehensive assessment of the capability of the field test facilities and the accuracy of aero-electro-mechanical analysis procedures. Results from this study show that the Carolus and Whisper 175 rotors are running at higher tip-speed ratios than are optimum for power production. The aero-electro-mechanical analysis predicted the high operating tip-speed ratios of the rotors and was accurate at predicting output power for the systems. It is shown that the wind turbines operate at high tip-speeds because of a miss-match between the aerodynamic drive torque and the operating torque of the wind-system generator. Through the change of load impedance on the wind generator, the research facility has the ability to modify the rotational speed of the wind turbines, allowing the rotors to perform closer to their optimum tip-speed. Comparisons between field test data and performance predictions show that the aero-electro-mechanical analysis was able to predict differences in power production and rotational speed which result from changes in the system load impedance.
A new mix of power for the ESO installations in Chile: greener, more reliable, cheaper
NASA Astrophysics Data System (ADS)
Filippi, G.; Tamai, R.; Kalaitzoglou, D.; Wild, W.; Delorme, A.; Rioseco, D.
2016-07-01
The highest sky quality demands for astronomical research impose to locate observatories often in areas not easily reached by the existing power infrastructures. At the same time, availability and cost of power is a primary factor for sustainable operations. Power may also be a potential source for CO2 pollution. As part of its green initiatives, ESO is in the process of replacing the power sources for its own, La Silla and Paranal-Armazones, and shared, ALMA, installations in Chile in order to provide them with more reliable, affordable, and smaller CO2 footprint power solutions. The connectivity to the Chilean interconnected power systems (grid) which is to extensively use Non-Conventional Renewable Energy (NCRE) as well as the use of less polluting fuels wherever self-generation cannot be avoided are key building blocks for the solutions selected for every site. In addition, considerations such as the environmental impact and - if required - the partnership with other entities have also to be taken into account. After years of preparatory work to which the Chilean Authorities provided great help and support, ESO has now launched an articulated program to upgrade the existing agreements/facilities in i) the La Silla Observatory, from free to regulated grid client status due to an agreement with a Solar Farm private initiative, in ii) the Paranal-Armazones Observatory, from local generation using liquefied petroleum gas (LPG) to connection to the grid which is to extensively use NCRE, and last but not least, in iii) the ALMA Observatory where ESO participates together with North American and East Asian partners, from replacing the LPG as fuel for the turbine local generation system with the use of less polluting natural gas (NG) supplied by a pipe connection to eliminate the pollution caused by the LPG trucks (currently 1 LPG truck from the VIII region, Bio Bio, to the II region, ALMA and back every day, for a total of 3000km). The technologies used and the status of completion of the different projects, as well as the expected benefits are discussed in this paper.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the relative cost of repairing the damaged facility to the replacement cost of that portion of the... improvement of a structure or facility, that has been damaged in excess of, or the cost of which equals or exceeds, 50 percent of the market value of the structure or placement cost of the facility (including all...
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta
In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supplymore » sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).« less
Concentrating Solar Power Projects - National Solar Thermal Power Facility
| Concentrating Solar Power | NREL National Solar Thermal Power Facility Status Date: February 13, 2014 Project Overview Project Name: National Solar Thermal Power Facility Country: India Location Capacity (Net): 1.0 MW Output Type: Steam Rankine Thermal Storage Storage Type: None
Scale Model Icing Research Tunnel
NASA Technical Reports Server (NTRS)
Canacci, Victor A.
1997-01-01
NASA Lewis Research Center's Icing Research Tunnel (IRT) is the world's largest refrigerated wind tunnel and one of only three icing wind tunnel facilities in the United States. The IRT was constructed in the 1940's and has been operated continually since it was built. In this facility, natural icing conditions are duplicated to test the effects of inflight icing on actual aircraft components as well as on models of airplanes and helicopters. IRT tests have been used successfully to reduce flight test hours for the certification of ice-detection instrumentation and ice protection systems. To ensure that the IRT will remain the world's premier icing facility well into the next century, Lewis is making some renovations and is planning others. These improvements include modernizing the control room, replacing the fan blades with new ones to increase the test section maximum velocity to 430 mph, installing new spray bars to increase the size and uniformity of the artificial icing cloud, and replacing the facility heat exchanger. Most of the improvements will have a first-order effect on the IRT's airflow quality. To help us understand these effects and evaluate potential improvements to the flow characteristics of the IRT, we built a modular 1/10th-scale aerodynamic model of the facility. This closed-loop scale-model pilot tunnel was fabricated onsite in the various shops of Lewis' Fabrication Support Division. The tunnel's rectangular sections are composed of acrylic walls supported by an aluminum angle framework. Its turning vanes are made of tubing machined to the contour of the IRT turning vanes. The fan leg of the tunnel, which transitions from rectangular to circular and back to rectangular cross sections, is fabricated of fiberglass sections. The contraction section of the tunnel is constructed from sheet aluminum. A 12-bladed aluminum fan is coupled to a turbine powered by high-pressure air capable of driving the maximum test section velocity to 550 ft/sec (Mach 0.45). The air turbine and instrumentation are housed inside a fiberglass nacelle. Total and static pressure measurements can be taken around the loop, and velocity and flow angularity measurements can be taken with hot-wire and five-hole probes at specific locations. The Scale Model Icing Research Tunnel (SMIRT) is undergoing checkout tests to determine how its airflow characteristics compare with the IRT. Near-term uses for this scale-model tunnel include determining the aerodynamic effects of replacing the 52-yearold W-shaped heat exchanger with a flat-faced heat exchanger. SMIRT is an integral part of the improvements planned for the IRT because testing the proposed IRT improvements in a scale-model tunnel will lower costs and improve productivity.
Designs for surge immunity in critical electronic facilities
NASA Technical Reports Server (NTRS)
Roberts, Edward F., Jr.
1991-01-01
In recent years, Federal Aviation Administration (FAA) embarked on a program replacing older tube type electronic equipment with newer solid state equipment. This replacement program dramatically increased the susceptibility of the FAA's facilities to lightning related damages. The proposal is presented of techniques which may be employed to lessen the susceptibility of new FAA electronic facility designs to failures resulting from lightning related surges and transients as well as direct strikes. The general concept espoused is one of a consistent system approach employing both perimeter and internal protection. It compares the technique presently employed to reduce electronic noise with other techniques which reduce noise while lowering susceptibility to lightning related damage. It is anticipated that these techniques will be employed in the design of an Air Traffic Control Tower in a high isokeraunic area. This facility would be subjected to rigorous monitoring over a multi-year period to provide quantitative data hopefully supporting the advantage of this design.
The Lesotho Hospital PPP experience: catalyst for integrated service delivery.
Coelho, Carla Faustino; O'Farrell, Catherine Commander
2011-01-01
For many years, Lesotho urgently needed to replace its main public hospital, Queen Elizabeth II. The project was initially conceived as a single replacement hospital, but eventually included the design and construction of a new 425 bed public hospital and adjacent primary care clinic, the renovation and expansion of three strategically located primary care clinics in the region and the management of all facilities, equipment and delivery of all clinical services in the health network by a private operator under contract for 18 years. The project's design was influenced by the recognition that a new facility alone would not address the underlying issues in service provision. The creation of this PPP health network and the contracting mechanism has increased accountability for service quality, shifted Government to a more strategic role and may also benefit other public facilities and providers in Lesotho. The county is considering the PPP approach for other health facilities.
EPA’s permeable pavement research and the Edison Environmental Center
A deteriorated parking area on EPA’s Edison Environmental Center needed replacement. The replacement offered an opportunity for the facility managers to reduce the impervious footprint and the reduce stormwater runoff volume. This also provided researchers from the National Risk ...
Advanced Electric Distribution, Switching, and Conversion Technology for Power Control
NASA Technical Reports Server (NTRS)
Soltis, James V.
1998-01-01
The Electrical Power Control Unit currently under development by Sundstrand Aerospace for use on the Fluids Combustion Facility of the International Space Station is the precursor of modular power distribution and conversion concepts for future spacecraft and aircraft applications. This unit combines modular current-limiting flexible remote power controllers and paralleled power converters into one package. Each unit includes three 1-kW, current-limiting power converter modules designed for a variable-ratio load sharing capability. The flexible remote power controllers can be used in parallel to match load requirements and can be programmed for an initial ON or OFF state on powerup. The unit contains an integral cold plate. The modularity and hybridization of the Electrical Power Control Unit sets the course for future spacecraft electrical power systems, both large and small. In such systems, the basic hybridized converter and flexible remote power controller building blocks could be configured to match power distribution and conversion capabilities to load requirements. In addition, the flexible remote power controllers could be configured in assemblies to feed multiple individual loads and could be used in parallel to meet the specific current requirements of each of those loads. Ultimately, the Electrical Power Control Unit design concept could evolve to a common switch module hybrid, or family of hybrids, for both converter and switchgear applications. By assembling hybrids of a common current rating and voltage class in parallel, researchers could readily adapt these units for multiple applications. The Electrical Power Control Unit concept has the potential to be scaled to larger and smaller ratings for both small and large spacecraft and for aircraft where high-power density, remote power controllers or power converters are required and a common replacement part is desired for multiples of a base current rating.
NASA Technical Reports Server (NTRS)
Young, Clarence P., Jr.; Wallace, John W.
1991-01-01
The results are presented of mechanical and physical properties characterization testing for the fiber glass prepreg system used to fabricate 15 of the replacement set of 25 fan blades for the National Transonic Facility. The fan blades were fabricated to be identical to the original blade set with the exception that the 7576 style E glass cloth used for the replacement set has a different surface finish than the original 7576 cloth. The 7781 E glass cloth and resin system were unchanged. The data are presented for elevated, room, and cryogenic temperatures. The results are compared with data from the original blade set and evaluated against selected structural design criteria. Test experience is described along with recommendations for future testing of these materials if required.
2013-06-24
ISS036-E-011590 (24 June 2013) --- Russian cosmonauts Alexander Misurkin (left) and Fyodor Yurchikhin, both Expedition 36 flight engineers, participate in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Yurchikhin replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011593 (24 June 2013) --- Russian cosmonauts Alexander Misurkin (left) and Fyodor Yurchikhin, both Expedition 36 flight engineers, participate in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Yurchikhin replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.
The Power of Numbers: Transforming Birth Through Collaborations
Hotelling, Barbara A.
2010-01-01
Collaborative efforts and coalitions have replaced exclusivity as birth organizations and individuals unite to humanize birth and provide women with transparency of information about maternity care providers and facilities and about access to the midwifery model of care. The Coalition for Improving Maternity Services and the upcoming 2010 “Mega Conference” to jointly celebrate the 50th anniversaries of Lamaze International and the International Childbirth Education Association serve as excellent examples of collaborative efforts to support natural, safe, and healthy birth practices as well as women's choices in childbirth. Childbirth educators are encouraged to learn from and support national coalitions devoted to improving maternity care and to use local resources to develop their own collaborative efforts on behalf of childbearing families. PMID:21358834
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shen, Bo; Lu, Hongyou; Price, Lynn K.
In the U.S., energy consumption by steam and process heat combined accounts for over 50% of the total energy use from industrial systems (see Figure 1). The use of boilers, process heaters, and furnaces for generating steam and heat in industrial facilities, commercial settings, and institutions consumes significant amounts of energy and is one of major sources of hazardous air pollutants, which contribute significantly to local pollution and global climate change. To address the energy and environmental challenges caused by boiler systems in the U.S., the country has taken a series of actions to reduce emissions from industrial, commercial andmore » institutional boilers, improve the efficiency of steam systems, replace coal with cleaner energy resources, and promote the wider use of combined heat and power (CHP).« less
Capacity and reliability analyses with applications to power quality
NASA Astrophysics Data System (ADS)
Azam, Mohammad; Tu, Fang; Shlapak, Yuri; Kirubarajan, Thiagalingam; Pattipati, Krishna R.; Karanam, Rajaiah
2001-07-01
The deregulation of energy markets, the ongoing advances in communication networks, the proliferation of intelligent metering and protective power devices, and the standardization of software/hardware interfaces are creating a dramatic shift in the way facilities acquire and utilize information about their power usage. The currently available power management systems gather a vast amount of information in the form of power usage, voltages, currents, and their time-dependent waveforms from a variety of devices (for example, circuit breakers, transformers, energy and power quality meters, protective relays, programmable logic controllers, motor control centers). What is lacking is an information processing and decision support infrastructure to harness this voluminous information into usable operational and management knowledge to handle the health of their equipment and power quality, minimize downtime and outages, and to optimize operations to improve productivity. This paper considers the problem of evaluating the capacity and reliability analyses of power systems with very high availability requirements (e.g., systems providing energy to data centers and communication networks with desired availability of up to 0.9999999). The real-time capacity and margin analysis helps operators to plan for additional loads and to schedule repair/replacement activities. The reliability analysis, based on computationally efficient sum of disjoint products, enables analysts to decide the optimum levels of redundancy, aids operators in prioritizing the maintenance options for a given budget and monitoring the system for capacity margin. The resulting analytical and software tool is demonstrated on a sample data center.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... approval to replace the Unit 4 turbine at the Jordan Dam Project. Specifically, the licensee proposes the following work: complete turbine replacement, wicket gate system rehabilitation or replacement, gate stem bushing replacement, turbine and generator bearing refurbishment, and related component replacement. The...
Code of Federal Regulations, 2010 CFR
2010-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
78 FR 57211 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... rehabilitation design. Taxiway/apron/fuel road pavement replacement. Taxiway/apron/fuel road pavement replacement... Description of Projects Approved for Collection and Use: Taxiway F improvements (design and construction). Drainage ditch improvements (design and construction). Apron C expansion (design and construction...
Ralph, J. E.; Strozzi, D.; Ma, T.; ...
2016-12-29
Room temperature or “warm” (273 K) indirect drive hohlraum experiments have been conducted on the National Ignition Facility with laser energies up to 1.26 MJ and compared to similar cryogenic or “cryo” (~20 K) experiments. Warm experiments use neopentane (C 5H 12) as the low pressure hohlraum fill gas instead of helium, and propane (C 3H 8) to replace the cryogenic DT or DHe3 capsule fill. The increased average Z of the hohlraum fill leads to increased inverse bremsstrahlung absorption and an overall hotter hohlraum plasma in simulations. The cross beam energy transfer (CBET) from outer laser beams (pointed towardmore » the laser entrance hole) to inner beams (pointed at the equator) was inferred indirectly from measurements of Stimulated Raman Scattering (SRS). These experiments show that a similar hot spot self-emission shape can be produced with less CBET in warm hohlraums. The measured inner cone SRS reflectivity (as a fraction of incident power neglecting CBET) is ~2.5× less in warm than cryo shots with similar hot spot shapes, due to a less need for CBET. The measured outer-beam stimulated the Brillouin scattering power that was higher in the warm shots, leading to a ceiling on power to avoid the optics damage. These measurements also show that the CBET induced by the flow where the beams cross can be effectively mitigated by a 1.5 Å wavelength shift between the inner and outer beams. A smaller scale direct comparison indicates that warm shots give a more prolate implosion than cryo shots with the same wavelength shift and pulse shape. Lastly, the peak radiation temperature was found to be between 5 and 7 eV higher in the warm than the corresponding cryo experiments after accounting for differences in backscatter.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ralph, J. E.; Strozzi, D.; Ma, T.
Room temperature or “warm” (273 K) indirect drive hohlraum experiments have been conducted on the National Ignition Facility with laser energies up to 1.26 MJ and compared to similar cryogenic or “cryo” (~20 K) experiments. Warm experiments use neopentane (C 5H 12) as the low pressure hohlraum fill gas instead of helium, and propane (C 3H 8) to replace the cryogenic DT or DHe3 capsule fill. The increased average Z of the hohlraum fill leads to increased inverse bremsstrahlung absorption and an overall hotter hohlraum plasma in simulations. The cross beam energy transfer (CBET) from outer laser beams (pointed towardmore » the laser entrance hole) to inner beams (pointed at the equator) was inferred indirectly from measurements of Stimulated Raman Scattering (SRS). These experiments show that a similar hot spot self-emission shape can be produced with less CBET in warm hohlraums. The measured inner cone SRS reflectivity (as a fraction of incident power neglecting CBET) is ~2.5× less in warm than cryo shots with similar hot spot shapes, due to a less need for CBET. The measured outer-beam stimulated the Brillouin scattering power that was higher in the warm shots, leading to a ceiling on power to avoid the optics damage. These measurements also show that the CBET induced by the flow where the beams cross can be effectively mitigated by a 1.5 Å wavelength shift between the inner and outer beams. A smaller scale direct comparison indicates that warm shots give a more prolate implosion than cryo shots with the same wavelength shift and pulse shape. Lastly, the peak radiation temperature was found to be between 5 and 7 eV higher in the warm than the corresponding cryo experiments after accounting for differences in backscatter.« less
Optimization of replacement and inspection decisions for multiple components on a power system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mauney, D.A.
1994-12-31
The use of optimization on the rescheduling of replacement dates provided a very proactive approach to deciding when components on individual units need to be addressed with a run/repair/replace decision. Including the effects of time value of money and taxes and unit need inside the spreadsheet model allowed the decision maker to concentrate on the effects of engineering input and replacement date decisions on the final net present value (NPV). The personal computer (PC)-based model was applied to a group of 140 forced outage critical fossil plant tube components across a power system. The estimated resulting NPV of the optimizationmore » was in the tens of millions of dollars. This PC spreadsheet model allows the interaction of inputs from structural reliability risk assessment models, plant foreman interviews, and actual failure history on a by component by unit basis across a complete power production system. This model includes not only the forced outage performance of these components caused by tube failures but, in addition, the forecasted need of the individual units on the power system and the expected cost of their replacement power if forced off line. The use of cash flow analysis techniques in the spreadsheet model results in the calculation of an NPV for a whole combination of replacement dates. This allows rapid assessments of {open_quotes}what if{close_quotes} scenarios of major maintenance projects on a systemwide basis and not just on a unit-by-unit basis.« less
40 CFR 60.590 - Applicability and designation of affected facility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... or replacement of equipment (defined in § 60.591) for the purpose of process improvement which is... in § 60.591) within a process unit is an affected facility. (b) Any affected facility under paragraph... “process unit” in § 60.590 of this subpart until the EPA takes final action to require compliance and...
Code of Federal Regulations, 2013 CFR
2013-04-01
... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...
Code of Federal Regulations, 2012 CFR
2012-04-01
... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...
Code of Federal Regulations, 2011 CFR
2011-04-01
... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...
Code of Federal Regulations, 2010 CFR
2010-04-01
... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...
Code of Federal Regulations, 2014 CFR
2014-04-01
... applicant's existing facilities; (5) A flow diagram or comparative study showing daily design capacity... designed to meet the goal of limiting the perceived noise at NSAs to an Ldn of 55 dBA or what mitigation...
78 FR 27472 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-10
... Approved For Collection And Use: Airfield lighting and vault. Runway 21 extension--preliminary design...--80 facility modification design and build-out. Access control enhancements. Security fence replacement. Airfield pavement survey. Jet bridge refurbishment. Security checkpoint modification. Friction...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-25
... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants AGENCY: Nuclear Regulatory... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants.'' This regulatory guide describes for applicants seeking nuclear power reactor licenses and licensees of nuclear power reactors...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PRODUCTION AND COGENERATION Exemption of Qualifying Small Power Production Facilities and Cogeneration... small power production facility with a power production capacity over 30 megawatts if such facility produces electric energy solely by the use of biomass as a primary energy source. (b) Exemption from the...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PRODUCTION AND COGENERATION Exemption of Qualifying Small Power Production Facilities and Cogeneration... small power production facility with a power production capacity over 30 megawatts if such facility produces electric energy solely by the use of biomass as a primary energy source. (b) Exemption from the...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PRODUCTION AND COGENERATION Exemption of Qualifying Small Power Production Facilities and Cogeneration... small power production facility with a power production capacity over 30 megawatts if such facility produces electric energy solely by the use of biomass as a primary energy source. (b) Exemption from the...
Replacement of ozone depleting and toxic chemicals in gravimetric analysis of non-volatile residue
NASA Technical Reports Server (NTRS)
Arnold, G. S.; Uht, J. C.; Sinsheimer, F. B.
1995-01-01
The standard tests for determining nonvolatile residue accretion on spacecraft surfaces and in clean processing facilities rely on the use of halogenated solvents that are targeted for elimination because of their toxic or ozone-depleting natures. This paper presents a literature-based screening survey for candidate replacement solvents. Potential replacements were evaluated for their vapor pressure, toxicity, and solvent properties. Three likely candidates were identified: ethyl acetate, methyl acetate, and acetone. Laboratory tests are presented that evaluate the suitability of these candidate replacement solvents.
Mercury free microscopy: an opportunity for core facility directors.
Baird, T Regan; Kaufman, Daniel; Brown, Claire M
2014-07-01
Mercury Free Microscopy (MFM) is a new movement that encourages microscope owners to choose modern mercury free light sources to replace more traditional mercury based arc lamps. Microscope performance is enhanced with new solid state technologies because they offer a more stable light intensity output and have a more uniform light output across the visible spectrum. Solid state sources not only eliminate mercury but also eliminate the cost of consumable bulbs (lifetime ∼200 hours), use less energy, reduce the instrument down time when bulbs fail and reduce the staff time required to replace and align bulbs. With lifetimes on the order of tens of thousands of hours, solid state replacements can pay for themselves over their lifetime with the omission of consumable, staff (no need to replace and align bulbs) and energy costs. Solid state sources are also sustainable and comply with institutional and government body mandates to reduce energy consumption, carbon footprints and hazardous waste. MFM can be used as a mechanism to access institutional financial resources for sustainable technology through a variety of stakeholders to defray the cost to microscope owners for the initial purchase of solid state sources or the replacement cost of mercury based sources. Core facility managers can take a lead in this area as "green" ambassadors for their institution by championing a local MFM program that will save their institution money and energy and eliminate mercury from the waste stream. Managers can leverage MFM to increase the visibility of their facility, their impact within the institution, and as a vital educational resource for scientific and administrative consultation.
Energy Systems Test Area (ESTA). Power Systems Test Facilities
NASA Technical Reports Server (NTRS)
Situ, Cindy H.
2010-01-01
This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.
Rehabilitation of a 410-MW utility boiler at Costa Sur, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosado, R.; Salmeron, M.
1995-12-31
To increase unit reliability and availability and to meet the current and future electric power demands in Puerto Rico, the Puerto Rico Electric Power Authority (PREPA) recently performed a scheduled outage rehabilitation of Costa Sur Power Station Unit 5. This major rehabilitation of a 23-year-old, 410 MW, oil-fired boiler was accompanied by the upgrading of the low-pressure turbine with new rotors. The boiler rehabilitation included the replacement of all waterwall floor panels from just below the burner windbox, down to the lower drum. Temporary support was provided for the lower drum and its structural system during the panel replacement. Themore » steam drum internals were completely rehabilitated, with the installation of a new liner and cleaning and repair of other internals as required. The superheater and reheater desuperheater liners were also replaced. In addition, all major components of both the firing system and the air preheaters were replaced. The gas recirculation fan was rehabilitated, and its discharge duct was replaced.« less
Code of Federal Regulations, 2012 CFR
2012-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
Code of Federal Regulations, 2013 CFR
2013-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
Code of Federal Regulations, 2014 CFR
2014-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos... Chemistry and Metallurgy Research Building Replacement Project (CMRR-NF) at Los Alamos National Laboratory...
ERIC Educational Resources Information Center
Scheideman, Dale; Dufresne, Ray
2001-01-01
Nevada's Clark County, the fastest growing school district in the nation, uses a life-cycle facilities management approach that monitors the individual components of each building on a database. The district's 10-year building program is addressing facilities infrastructure renewal, deferred maintenance, replacement, and new school construction.…
Planning for Capital Reinvestment.
ERIC Educational Resources Information Center
Biedenweg, Frederick; Weisburg-Swanson, Lynda; Gardner, Catherine
1998-01-01
Describes and evaluates four alternatives for planning and budgeting for capital reinvestment for college and university facilities: physical plant auditing; a depreciation-based approach; percentage of current replacement value; and facility subsystem modeling, or life-cycle modeling. Each has advantages and limitations in budgeting for and…
NASA Technical Reports Server (NTRS)
Scully, Robert C.
2011-01-01
This report documents an investigation into observed failures associated with conducted susceptibility testing of Crew Quarters (CQ) hardware in the Johnson Space Center (JSC) Electromagnetic Interference (EMI) Measurement Facility, and the work accomplished to identify the source of the observed behavior. Investigation led to the conclusion that the hardware power input impedance was interacting with the facility power impedance leading to instability at the observed frequencies of susceptibility. Testing performed in other facilities did not show this same behavior, pointing back to the EMI Measurement Facility power as the potential root cause. A LISN emulating the Station power bus impedance was inserted into the power circuit, and the susceptibility was eliminated from the measurements.
Working together to ensure safety at hydro projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartel, J.W.
Providing for public safety around a hydroelectric facility can be critically important to the welfare of a hydro-power producer. With this in mind, Wisconsin Electric Power Company and Wisconsin Public Service Corporation have worked together to develop consistent safety signage and several for their hydro projects. Although the two utilities sometimes compete for electric customers, they cooperate to ensure the safety to those customers. Both WE and WPS took steps in 1986 to make their operations safer through involvement in the Wisconsin/Michigan Hydro User Group. The organization has 25 members-primarily of electric utilities and paper companies-who operate hydro facilities inmore » the two states. The two areas that the HUG studied in public safety were signs and warning systems. HUG established a sign committee to study how to increase safety of people around hydro plants through signs, explained Ted Handrick, hydro plant superintendent at WPS. The committee's recommendations led to development of a statewide uniform sign system adopted by all HUG members. The committee used Wisconsin Department of Natural Resources' guidelines for warning signs and portages in developing the signage standards. HUG members are converting to these new sign standards as they replace old signs and/or install new signs. Notices describing the new signage system have been placed near each hydro plant, at boat landings, and in campgrounds. The signs are mounted well above ground level so they can be seen and easily read by recreationalists. Warning systems, in accordance with HUG warning standards, were installed at WE and WPS hydro facilities. These systems alert nearby recreational users of rapid increases in water flow when generating units are turned on or when spillway gates are opened. Soon after the authors installed equipment to remotely operate its hydro facilities, the utility experienced a dramatic increase increase in intrusion on dams and other structures at the projects.« less
Pace, D. C.; Lanctot, M. J.; Jackson, G. L.; ...
2015-09-21
The march towards electricity production through tokamaks requires the construction of new facilities and the inevitable replacement of the previous generation. There are, however, research topics that are better suited to the existing tokamaks, areas of great potential that are not sufficiently mature for implementation in high power machines, and these provide strong support for a balanced policy that includes the redirection of existing programs. Spin polarized fusion, in which the nuclei of tokamak fuel particles are spin-aligned and favorably change both the fusion cross-section and the distribution of initial velocity vectors of charged fusion products, is described here asmore » an example of a technological and physics topic that is ripe for development in a machine such as the DIII-D tokamak. In this study, such research and development experiments may not be efficient at the ITER-scale, while the plasma performance, diagnostic access, and collaborative personnel available within the United States’ magnetic fusion research program, and at the DIII-D facility in particular, provide a unique opportunity to further fusion progress.« less
Future Development of Dense Ferroelectric Memories for Space Applications
NASA Technical Reports Server (NTRS)
Philpy, Stephen C.; Derbenwick, Gary F.
2001-01-01
The availability of high density, radiation tolerant, nonvolatile memories is critical for space applications. Ferroelectric memories, when fabricated with radiation hardened complementary metal oxide semiconductors (CMOS), can be manufactured and packaged to provide high density replacements for Flash memory, which is not radiation tolerant. Previous work showed ferroelectric memory cells to be resistant to single event upsets and proton irradiation, and ferroelectric storage capacitors to be resistant to neutron exposure. In addition to radiation hardness, the fast programming times, virtually unlimited endurance, and low voltage, low power operation make ferroelectric memories ideal for space missions. Previously, a commercial double level metal 64-kilobit ferroelectric memory was presented. Although the capabilities of radiation hardened wafer fabrication facilities lag behind those of the most modern commercial wafer fabrication facilities, several paths to achieving radiation tolerant, dense ferroelectric memories are emerging. Both short and long term solutions are presented in this paper. Although worldwide major semiconductor companies are introducing commercial ferroelectric memories, funding limitations must be overcome to proceed with the development of high density, radiation tolerant ferroelectric memories.
Maximization of revenues for power sales from a solid waste resources recovery facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The report discusses the actual implementation of the best alternative in selling electrical power generated by an existing waste-to-energy facility, the Metro-Dade County Resources Recovery Plant. After the plant processes and extracts various products out of the municipal solid waste, it burns it to produce electrical power. The price for buying power to satisfy the internal needs of our Resources Recovery Facility (RRF) is substantially higher than the power price for selling electricity to any other entity. Therefore, without any further analysis, it was decided to first satisfy those internal needs and then export the excess power. Various alternatives weremore » thoroughly explored as to what to do with the excess power. Selling power to the power utilities or utilizing the power in other facilities were the primary options.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...
Code of Federal Regulations, 2011 CFR
2011-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...
7 CFR 1710.251 - Construction work plans-distribution borrowers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...
Development and future of ultraviolet light-emitting diodes: UV-LED will replace the UV lamp
NASA Astrophysics Data System (ADS)
Muramoto, Yoshihiko; Kimura, Masahiro; Nouda, Suguru
2014-06-01
Ultraviolet light-emitting diodes (UV-LEDs) have started replacing UV lamps. The power per LED of high-power LED products has reached 12 W (14 A), which is 100 times the values observed ten years ago. In addition, the cost of these high-power LEDs has been decreasing. In this study, we attempt to understand the technologies and potential of UV-LEDs.
Nuclear Warheads: The Reliable Replacement Warhead program and the Life Extension Program
2007-12-03
eliminate the need for ESD controls.”67 CRS-22 68 The Defense Nuclear Facilities Safety Board was created by Congress 1988 “as an independent oversight...public health and safety’ at DOE’s defense nuclear facilities .” U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http://www.dnfsb.gov...about/index.html]. 69 Personal communication, Kent Fortenberry, Technical Director, Defense Nuclear Facilities Safety Board, September 14, 2006. 70
Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program
2006-12-13
Defense Nuclear Facilities Safety Board was created by Congress 1988 "as an independent oversight organization within the Executive Branch charged... nuclear facilities ." U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http://www.dnfsb.gov/about/index.html]. involving CHE and plutonium...approach, if successful, would “reduce or eliminate the need for ESD controls.”42 Kent Fortenberry, Technical Director of the Defense Nuclear Facilities
Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program
2007-04-04
Information provided by Pantex Plant, Sept. 19, 2006. 50 The Defense Nuclear Facilities Safety Board was created by Congress 1988 “as an independent...protection of public health and safety’ at DOE’s defense nuclear facilities .” U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http...www.dnfsb.gov/about/index.html]. 51 Personal communication, Kent Fortenberry, Technical Director, Defense Nuclear Facilities Safety Board, Sept. 14, 2006
Nuclear Warheads: The Reliable Replacement Warhead Program and the Life Extension Program
2007-07-16
The Defense Nuclear Facilities Safety Board was created by Congress 1988 “as an independent oversight organization within the Executive Branch charged... nuclear facilities .” U.S. Defense Nuclear Facilities Safety Board. “Who We Are,” at [http://www.dnfsb.gov/about/index.html]. beginning, addressed safety...approach, if successful, would “reduce or eliminate the need for ESD controls.”55 Kent Fortenberry, Technical Director of the Defense Nuclear Facilities Safety
75 FR 29785 - Draft Regulatory Guide: Issuance, Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... Guide, DG-1248, ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License..., ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License Examinations, and... or acceptance of a nuclear power plant simulation facility for use in operator and senior operator...
77 FR 24646 - Open Access and Priority Rights on Interconnection Facilities
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-25
... multiple generation facilities to transmit power from the generation facility to the integrated... power flows toward the network grid, with no electrical loads between the generation facilities and the... generator expansion plans with milestones for construction of generation facilities and can demonstrate that...
Energy Systems Integration Facility Videos | Energy Systems Integration
Facility | NREL Energy Systems Integration Facility Videos Energy Systems Integration Facility Integration Facility NREL + SolarCity: Maximizing Solar Power on Electrical Grids Redefining What's Possible for Renewable Energy: Grid Integration Robot-Powered Reliability Testing at NREL's ESIF Microgrid
40 CFR 60.2030 - Who implements and enforces this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... qualifying small power production facility or cogeneration facility under § 60.2020(e) or (f) is combusting... qualifying small power production facility or cogeneration facility under § 60.2020(e) or (f) is combusting...
The US space station and its electric power system
NASA Technical Reports Server (NTRS)
Thomas, Ronald L.
1988-01-01
The United States has embarked on a major development program to have a space station operating in low earth orbit by the mid-1990s. This endeavor draws on the talents of NASA and most of the aerospace firms in the U.S. Plans are being pursued to include the participation of Canada, Japan, and the European Space Agency in the space station. From the start of the program these was a focus on the utilization of the space station for science, technology, and commercial endeavors. These requirements were utilized in the design of the station and manifest themselves in: pressurized volume; crew time; power availability and level of power; external payload accommodations; microgravity levels; servicing facilities; and the ability to grow and evolve the space station to meet future needs. President Reagan directed NASA to develop a permanently manned space station in his 1984 State of the Union message. Since then the definition phase was completed and the development phase initiated. A major subsystem of the space station is its 75 kW electric power system. The electric power system has characteristics similar to those of terrestrial power systems. Routine maintenance and replacement of failed equipment must be accomplished safely and easily and in a minimum time while providing reliable power to users. Because of the very high value placed on crew time it is essential that the power system operate in an autonomous mode to minimize crew time required. The power system design must also easily accommodate growth as the power demands by users are expected to grow. An overview of the U.S. space station is provided with special emphasis on its electrical power system.
2013-06-24
ISS036-E-011479 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011459 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011481 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011441 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011747 (24 June 2013) --- Russian cosmonaut Alexander Misurkin (bottom center), Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011642 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011440 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.
2013-06-24
ISS036-E-011480 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011745 (24 June 2013) --- Russian cosmonaut Alexander Misurkin (bottom center), Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011598 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.
2013-06-24
ISS036-E-011477 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011439 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.
2013-06-24
ISS036-E-011640 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
2013-06-24
ISS036-E-011608 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.
NASA Astrophysics Data System (ADS)
Mattolat, C.; Rothe, S.; Schwellnus, F.; Gottwald, T.; Raeder, S.; Wendt, K.
2009-03-01
On-line production facilities for radioactive isotopes nowadays heavily rely on resonance ionization laser ion sources due to their demonstrated unsurpassed efficiency and elemental selectivity. Powerful high repetition rate tunable pulsed dye or Ti:sapphire lasers can be used for this purpose. To counteract limitations of short pulse pump lasers, as needed for dye laser pumping, i.e. copper vapor lasers, which include high maintenance and nevertheless often only imperfect reliability, an all-solid-state Nd:YAG pumped Ti:sapphire laser system has been constructed. This could complement or even replace dye laser systems, eliminating their disadvantages but on the other hand introduce shortcomings on the side of the available wavelength range. Pros and cons of these developments will be discussed.
Inorganic-ligand exchanging time effect in PbS quantum dot solar cell
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Byung-Sung; Hong, John; Hou, Bo
2016-08-08
We investigate time-dependent inorganic ligand exchanging effect and photovoltaic performance of lead sulfide (PbS) nanocrystal films. With optimal processing time, volume shrinkage induced by residual oleic acid of the PbS colloidal quantum dot (CQD) was minimized and a crack-free film was obtained with improved flatness. Furthermore, sufficient surface passivation significantly increased the packing density by replacing from long oleic acid to a short iodide molecule. It thus facilities exciton dissociation via enhanced charge carrier transport in PbS CQD films, resulting in the improved power conversion efficiency from 3.39% to 6.62%. We also found that excess iodine ions on the PbSmore » surface rather hinder high photovoltaic performance of the CQD solar cell.« less
NASA Astrophysics Data System (ADS)
Luchtman, G.; Bracke, T.
1981-11-01
The feasibility of railway transport of liquid and solid heat carriers in tank cars so as to replace pipeline transport of small to medium large heat loads was investigated. The typical characteristics of railway transport were analyzed and all essential technical and economical variables were integrated in a transport model. Over 1000 complex chemical compounds were evaluated for their suitability as heat carriers. Of these, three ammonia compounds are considered as promising. Considering, however, that complicated and expensive facilities are needed for heat transfer to and from ammonia, water is identified as the better choice. Results, based on 1975 transport prices, show that railway heat transport becomes competitive for heat loads above 50 to 100 MW and transport distances over 20 km.
NASA Technical Reports Server (NTRS)
Marsh, Angela L.; Dudley, Stephanie R. B.
2014-01-01
With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.
10 CFR 50.83 - Release of part of a power reactor facility or site for unrestricted use.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Release of part of a power reactor facility or site for... of a power reactor facility or site for unrestricted use. (a) Prior written NRC approval is required... release. Nuclear power reactor licensees seeking NRC approval shall— (1) Evaluate the effect of releasing...
10 CFR 50.83 - Release of part of a power reactor facility or site for unrestricted use.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Release of part of a power reactor facility or site for... of a power reactor facility or site for unrestricted use. (a) Prior written NRC approval is required... release. Nuclear power reactor licensees seeking NRC approval shall— (1) Evaluate the effect of releasing...
77 FR 48592 - Bus and Bus Facilities Discretionary Program Funds
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
... to award the funds for capital investments aimed at replacing or rehabilitating transit... (DOT) Federal Transit Administration (FTA) announces the selection of capital projects for the State of... Facilities Program funds. As outlined in the NOFA, the Section 5309 funds would be awarded for capital...
Food Service Equipment. Third Edition.
ERIC Educational Resources Information Center
Jernigan, Anna Katherine; Ross, Lynne Nannen
This book provides information that will help in purchasing the kind of food service equipment most useful in any given facility. Hence, it should be of value to architects, contractors, administrators, dietitians, managers, and others involved in remodeling a facility, replacing equipment, and/or improving the efficiency of food service…
Code of Federal Regulations, 2010 CFR
2010-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., review of standard referenced design approvals, special projects, inspections and import and export... standard referenced design approvals, special projects, inspections and import and export licenses..., approvals of facility standard reference designs, re-qualification and replacement examinations for reactor...
78 FR 37760 - Electrical Equipment in Hazardous Locations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
... floating facilities engaged in OCS activities, however, equipment could be installed in hazardous locations... composition and the extent of equipment replacement. The myriad types of MODUs and facilities operating on the.... USCG-2012-0850] RIN 1625-AC00 Electrical Equipment in Hazardous Locations AGENCY: Coast Guard, DHS...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Guidance for Determining the Acceptable Construction Area for Replacements A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Guidance for Determining the Acceptable Construction Area for Replacements A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Guidance for Determining the Acceptable Construction Area for Replacements A Appendix A to Part 2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... certification, pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeni, Lorenzo; Hesselbæk, Bo; Bech, John
This article presents an example of application of a modern test facility conceived for experiments regarding the integration of renewable energy in the power system. The capabilities of the test facility are used to validate dynamic simulation models of wind power plants and their controllers. The models are based on standard and generic blocks. The successful validation of events related to the control of active power (control phenomena in <10 Hz range, including frequency control and power oscillation damping) is described, demonstrating the capabilities of the test facility and drawing the track for future work and improvements.
Electric power generation using geothermal brine resources for a proof of concept facility
NASA Technical Reports Server (NTRS)
Hankin, J. W.
1974-01-01
An exploratory systems study of a geothermal proof-of-concept facility is being conducted. This study is the initial phase (Phase 0) of a project to establish the technical and economic feasibility of using hot brine resources for electric power production and other industrial applications. Phase 0 includes the conceptual design of an experimental test-bed facility and a 10-MWe power generating facility.
Experimental room temperature hohlraum performance study on the National Ignition Facility
NASA Astrophysics Data System (ADS)
Ralph, J. E.; Strozzi, D.; Ma, T.; Moody, J. D.; Hinkel, D. E.; Callahan, D. A.; MacGowan, B. J.; Michel, P.; Kline, J. L.; Glenzer, S. H.; Albert, F.; Benedetti, L. R.; Divol, L.; MacKinnon, A. J.; Pak, A.; Rygg, J. R.; Schneider, M. B.; Town, R. P. J.; Widmann, K.; Hsing, W.; Edwards, M. J.
2016-12-01
Room temperature or "warm" (273 K) indirect drive hohlraum experiments have been conducted on the National Ignition Facility with laser energies up to 1.26 MJ and compared to similar cryogenic or "cryo" (˜20 K) experiments. Warm experiments use neopentane (C5H12) as the low pressure hohlraum fill gas instead of helium, and propane (C3H8) to replace the cryogenic DT or DHe3 capsule fill. The increased average Z of the hohlraum fill leads to increased inverse bremsstrahlung absorption and an overall hotter hohlraum plasma in simulations. The cross beam energy transfer (CBET) from outer laser beams (pointed toward the laser entrance hole) to inner beams (pointed at the equator) was inferred indirectly from measurements of Stimulated Raman Scattering (SRS). These experiments show that a similar hot spot self-emission shape can be produced with less CBET in warm hohlraums. The measured inner cone SRS reflectivity (as a fraction of incident power neglecting CBET) is ˜2.5 × less in warm than cryo shots with similar hot spot shapes, due to a less need for CBET. The measured outer-beam stimulated the Brillouin scattering power that was higher in the warm shots, leading to a ceiling on power to avoid the optics damage. These measurements also show that the CBET induced by the flow where the beams cross can be effectively mitigated by a 1.5 Å wavelength shift between the inner and outer beams. A smaller scale direct comparison indicates that warm shots give a more prolate implosion than cryo shots with the same wavelength shift and pulse shape. Finally, the peak radiation temperature was found to be between 5 and 7 eV higher in the warm than the corresponding cryo experiments after accounting for differences in backscatter.
A program for preserving and advancing nuclear power in the USA
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1988-05-01
In the USA, utilities are very unlikely to begin ordering any new nuclear plants for use before the year 2000. Too many obstacles currently exist. On the other hand, long-term influences ultimately will force construction of more nuclear units. The problem is whether to do nothing now, and wait until economic forces dictate action, or begin meaningful preparations for the future. Approximately 100 nuclear plants currently are operating in the USA and another dozen will start up within the next few years. Completion of those plants will mark the end of new startups for more than a decade to come.more » Many nuclear facilities have already operated for 10 to 20 years, and in some cases longer. While the average operating lifetime of nuclear stations has yet to be determined, 30 to 50 years is usually assumed. Therefore, as plants age, decommissioning will be necessary and the number of operating units will steadily decline. Nuclear energy production will peak (after new startups) at approximately 20 percent of total national electricity production and, as decommissioning accelerates, will decline towards zero during the first few decades of the next century. All types of power plants age and must eventually be replaced. Furthermore, even taking into account modest growth and ever improving conservation, increasing demand will require the building of several hundred new electrical generating facilities during the next several decades. What types of generating plants will be built is not clear. Will coal satisfy all our needs? Most unlikely. Oil? Out of the question. Natural gas? A share. Hydro? Few new dams will be built. Passive energies, such as solar? A minor fraction. Do without nuclear power? Most unlikely.« less
Hubble Space Telescope (HST) at Lockheed Facility during preflight assembly
1988-03-31
A mechanical arm positions the axial scientific instrument (SI) module (orbital replacement unit (ORU)) just outside the open doors of the Hubble Space Telescope (HST) Support System Module (SSM) as clean-suited technicians oversee the process. HST assembly is being completed at the Lockheed Facility in Sunnyvale, California.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
... Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy... construction and operation of the nuclear facility portion of the Chemistry and Metallurgy Research Building... Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos...
Experience with a UNIX based batch computing facility for H1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gerhards, R.; Kruener-Marquis, U.; Szkutnik, Z.
1994-12-31
A UNIX based batch computing facility for the H1 experiment at DESY is described. The ultimate goal is to replace the DESY IBM mainframe by a multiprocessor SGI Challenge series computer, using the UNIX operating system, for most of the computing tasks in H1.
Modernization of B-2 Data, Video, and Control Systems Infrastructure
NASA Technical Reports Server (NTRS)
Cmar, Mark D.; Maloney, Christian T.; Butala, Vishal D.
2012-01-01
The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.
Modernization of B-2 Data, Video, and Control Systems Infrastructure
NASA Technical Reports Server (NTRS)
Cmar, Mark D.; Maloney, Christian T.; Butala, Vishal D.
2012-01-01
The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.
An engine awaits processing in the new engine shop at KSC
NASA Technical Reports Server (NTRS)
1998-01-01
A new Block 2A engine awaits processing in the low bay of the Space Shuttle Main Engine Processing Facility (SSMEPF). Officially opened on July 6, the new facility replaces the Shuttle Main Engine Shop. The SSMEPF is an addition to the existing Orbiter Processing Facility Bay 3. The engine is scheduled to fly on the Space Shuttle Endeavour during the STS-88 mission in December 1998.
Strategic facility planning improves capital decision making.
Reeve, J R
2001-03-01
A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.
NASA Astrophysics Data System (ADS)
Yu, Xiaohui; Jiang, Anni; Yang, Hongyan; Meng, Haowen; Dou, Peng; Ma, Daqian; Xu, Xinhua
2015-08-01
Polymethyl methacrylate (PMMA)-coated hollow Sn-Co nanospheres (Sn-Co@PMMA) with superior electrochemical performance had been synthesized via a facile galvanic replacement method followed by an in situ emulsion polymerization route. The properties were investigated in detail and results show that the hollow Sn-Co nanospheres were evenly coated with PMMA. Benefiting from the protection of the PMMA layers, the hollow Sn-Co@PMMA nanocomposite is capable of retaining a high capacity of 590 mAh g-1 after 100 cycles with a coulomb efficiency above 98%, revealing better electrochemical properties compared with hollow Sn-Co anodes. The PMMA coating could help accommodate the mechanical strain caused by volume expansion and stabilize the solid electrolyte interphase (SEI) film formed on the electrode. Such a facile process could be further extended to other anode materials for lithium-ion batteries.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-10
... Bases and replacing the isolation time with the phase, ``within limits.'' The proposed change does not... isolation valves are retained in the TS. Future changes to the Bases or licensee-controlled document will be... referenced in the Bases. In addition, the valve isolation times are replaced in the TS with the phase...
NASA Technical Reports Server (NTRS)
Colozza, Anthony J.; Cataldo, Robert L.
2015-01-01
This study looks at the applicability of utilizing the Segmented Thermoelectric Modular Radioisotope Thermoelectric Generator (STEM-RTG) or a high-power radioisotope generator to replace the Advanced Stirling Radioisotope Generator (ASRG), which had been identified as the baseline power system for a number of planetary exploration mission studies. Nine different Discovery-Class missions were examined to determine the applicability of either the STEM-RTG or the high-power SRG power systems in replacing the ASRG. The nine missions covered exploration across the solar system and included orbiting spacecraft, landers and rovers. Based on the evaluation a ranking of the applicability of each alternate power system to the proposed missions was made.
The 50-horsepower solar-powered irrigation facility located near Gila Bend, Arizona
NASA Astrophysics Data System (ADS)
Smith, W. A.; Alexander, G.; Busch, D. F.
1980-05-01
The 50 horsepower solar powered irrigation facility near Gila Bend, Arizona which includes a Rankine cycle demonstrates the technical feasibility of solar powered pumping. The design of a facility specifically for the irrigation farmer using the technology that has been developed over the last four years is proposed.
The 50-horsepower solar-powered irrigation facility located near Gila Bend, Arizona
NASA Technical Reports Server (NTRS)
Smith, W. A.; Alexander, G.; Busch, D. F.
1980-01-01
The 50 horsepower solar powered irrigation facility near Gila Bend, Arizona which includes a Rankine cycle demonstrates the technical feasibility of solar powered pumping. The design of a facility specifically for the irrigation farmer using the technology that has been developed over the last four years is proposed.
76 FR 76044 - Safety Zone; Power Line Replacement, West Bay, Panama City, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-0983] RIN 1625-AA00 Safety Zone; Power Line Replacement, West Bay, Panama City, FL AGENCY: Coast Guard, DHS. ACTION..., West Bay, Panama City, FL (a) Location. The following area is a safety zone: A portion of West Bay...
Laboratory 15 kV high voltage solar array facility
NASA Technical Reports Server (NTRS)
Kolecki, J. C.; Gooder, S. T.
1976-01-01
The laboratory high voltage solar array facility is a photoelectric power generating system. Consisting of nine modules with over 23,000 solar cells, the facility is capable of delivering more than a kilowatt of power. The physical and electrical characteristics of the facility are described.
Research on PM2.5 emission reduction path of China ‘s electric power industry based on DEA model
NASA Astrophysics Data System (ADS)
Jin, Yanming; Yang, Fan; Liu, Jun
2018-02-01
Based on the theory of data envelopment analysis, this study constructs the environmental performance evaluation model of the power industry, analyzes the performance of development of clean energy, the implementation of electricity replacement, and the development of coal-fired energy-saving and emission-reducing measures. Put forward technology path to reduce emission in the future. The results show that (1) improving the proportion of coal for power generation, speeding up the replacement of electricity is the key to solve the haze in China. (2) With the photovoltaic and other new energy power generation costs gradually reduced and less limit from thermal energy, by final of “thirteenth five-years plan”, the economy of clean energy will surpass thermal energy-saving emission reduction. (3) After 2025, the economy of the electricity replacement will be able to show.
Digital I and C system upgrade integration technique
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, H. W.; Shih, C.; Wang, J. R.
2012-07-01
This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digitalmore » Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)« less
NASA Technical Reports Server (NTRS)
Spivey, Reggie; Spearing, Scott; Jordan, Lee
2012-01-01
The Microgravity Science Glovebox (MSG) is a double rack facility aboard the International Space Station (ISS), which accommodates science and technology investigations in a "workbench' type environment. The MSG has been operating on the ISS since July 2002 and is currently located in the US Laboratory Module. In fact, the MSG has been used for over 10,000 hours of scientific payload operations and plans to continue for the life of ISS. The facility has an enclosed working volume that is held at a negative pressure with respect to the crew living area. This allows the facility to provide two levels of containment for small parts, particulates, fluids, and gases. This containment approach protects the crew from possible hazardous operations that take place inside the MSG work volume and allows researchers a controlled pristine environment for their needs. Research investigations operating inside the MSG are provided a large 255 liter enclosed work space, 1000 watts of dc power via a versatile supply interface (120, 28, + 12, and 5 Vdc), 1000 watts of cooling capability, video and data recording and real time downlink, ground commanding capabilities, access to ISS Vacuum Exhaust and Vacuum Resource Systems, and gaseous nitrogen supply. These capabilities make the MSG one of the most utilized facilities on ISS. MSG investigations have involved research in cryogenic fluid management, fluid physics, spacecraft fire safety, materials science, combustion, and plant growth technologies. Modifications to the MSG facility are currently under way to expand the capabilities and provide for investigations involving Life Science and Biological research. In addition, the MSG video system is being replaced with a state-of-the-art, digital video system with high definition/high speed capabilities, and with near real-time downlink capabilities. This paper will provide an overview of the MSG facility, a synopsis of the research that has already been accomplished in the MSG, and an overview of the facility enhancements that will shortly be available for use by future investigators.
Autonomous Electrothermal Facility for Oil Recovery Intensification Fed by Wind Driven Power Unit
NASA Astrophysics Data System (ADS)
Belsky, Aleksey A.; Dobush, Vasiliy S.
2017-10-01
This paper describes the structure of autonomous facility fed by wind driven power unit for intensification of viscous and heavy crude oil recovery by means of heat impact on productive strata. Computer based service simulation of this facility was performed. Operational energy characteristics were obtained for various operational modes of facility. The optimal resistance of heating element of the downhole heater was determined for maximum operating efficiency of wind power unit.
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on themore » analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.« less
NASA Astrophysics Data System (ADS)
Gausachs, Gaston
2008-07-01
The Near Infrared Chronographic Imager (NICI) being commissioned at Gemini was upgraded with a more powerful Chilled Water Glycol System to address early overheating problems. The previous system was replaced with a completely new design favoring improved airflow and increased heat transfer capabilities. The research leading to this upgrade showed a significant lack of cooling power of the original design. The solution was a combination of commercial heat exchanger and fans and a custom built enclosure. As a prime infrared telescope facility, Gemini is very much interested in maintaining the least amount of heat dissipated to the ambient air. The results obtained through the implementation of this solution will be helpful in understanding the state of other existing electronics enclosures as well as those for new instruments to come. With the advent of electronic intensive AO systems, future electronics enclosures must take full advantage of improved cooling. This paper describes the design and implementation phases of the project. The results under maximum operating capacity proved to be within the expected theoretical values and were deemed successful.
Noise Transmission Characteristics of Damped Plexiglas Windows
NASA Technical Reports Server (NTRS)
Gibbs, Gary P.; Buehrle, Ralph D.; Klos, Jacob; Brown, Sherilyn A.
2002-01-01
Most general aviation aircraft utilize single layer plexiglas material for the windshield and side windows. Adding noise control treatments to transparent panels is a challenging problem. In this paper, damped plexiglas windows are evaluated for replacement of conventional windows in general aviation aircraft to reduce the structure-borne and airborne noise transmitted into the interior. In contrast to conventional solid windows, the damped plexiglas window panels are fabricated using two or three layers of plexiglas with transparent viscoelastic damping material sandwiched between the layers. Results from acoustic tests conducted in the NASA Langley Structural Acoustic Loads and Transmission (SALT) facility are used to compare different designs of the damped plexiglas panels with solid windows of the same nominal thickness. Comparisons of the solid and damped plexiglas panels show reductions in the radiated sound power of up to 8 dB at low frequency resonances and as large as 4.5 dB over a 4000 Hz bandwidth. The weight of the viscoelastic treatment was approximately 1% of the panel mass. Preliminary FEM/BEM modeling shows good agreement with experimental results for radiated sound power.
The New Anechoic Shielded Chambers Designed for Space and Commercial Applications at LIT
NASA Technical Reports Server (NTRS)
da Silva, Benjamim; Galvao, M. C.; Pereira, Clovis Solano
2008-01-01
The main objective of this paper is to present the capabilities of the new anechoic shielded rooms designed for space and commercial applications as part of the Integration and Testing Laboratory (LIT, Laboratorio de Integracao e Testes) in Brazil. A new anechoic shielded room named CBA2 has been in full operation since March 2007 and a remodeled chamber CBA1 is planned to be ready by the end of 2008, replacing an old facility which was in operation for the last 18 years. The Brazilian Space Program started with very small and simple satellites and the old CBA1 chamber was conceived in 1987 to accomplish the EMI/EMC tests not requiring significant volumes. Since the very beginning this facility was also used by the private sector for other applications mainly due to the absorption of digital electronics in all kind of products. The intense use of this facility during the last years, operating three shifts a day, caused a normal degradation and imposed several limitations. Therefore, a new totally remodeled chamber was designed considering the state of the art in terms of absorbers and associated instrumentation. On the other hand the facility CBA2 was conceived, designed and implemented to test large satellites taking into account the advance of the technology in terms of RF frequencies, power level, testing methodologies and several other factors. A very interesting and unique aspect of this project was the partnership between the private sector and governmental institution. As a result, the total investment was shared between several companies and consequently a time-sharing use of the facility as well.
18 CFR 292.204 - Criteria for qualifying small power production facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... production capacity of any other small power production facilities that use the same energy resource, are... production facilities within one mile of such facilities. (b) Fuel use. (1)(i) The primary energy source of...
18 CFR 292.204 - Criteria for qualifying small power production facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Criteria for qualifying small power production facilities. 292.204 Section 292.204 Conservation of Power and Water Resources... OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small...
18 CFR 292.204 - Criteria for qualifying small power production facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Criteria for qualifying small power production facilities. 292.204 Section 292.204 Conservation of Power and Water Resources... OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small...
18 CFR 292.204 - Criteria for qualifying small power production facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Criteria for qualifying small power production facilities. 292.204 Section 292.204 Conservation of Power and Water Resources... OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small...
75 FR 73911 - Grassland Reserve Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
..., expand its discussion regarding GRP policy for wind and solar power facilities, and remove the blanket prohibition upon wind power facilities for off-farm power generation. Additionally, the CCC sought public...
ERIC Educational Resources Information Center
Kennedy, Mike
2009-01-01
Even before the state fire marshal ordered the Somersworth (N.H.) School District in 2007 to abandon the top two floors of Hilltop Elementary School because of safety concerns, folks in the city of 12,000 had been debating whether the aging facility should be replaced--and how to pay for it. Finally, in February 2009, the city council approved…
ERIC Educational Resources Information Center
Roy, Ken
2010-01-01
If your lab facilities are going to be replaced or renovated, you should insist that the science instructors be involved in the process from planning to construction. You know what you'll need in a facility, and your input should be sought out by administrators and architects alike. Once construction is complete, changes can be very costly, so…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-04
... Gas Act (NGA) requires a natural gas company to have certificate authorization for the ``construction...,'' it would not rely on section 2.55 because of ``doubts that the Natural Gas Act authorizes it to... in its procedures with respect to rate filings and certification of natural-gas facilities...
75 FR 24740 - Recovery Policy RP9523.5, Debris Removal From Waterways
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
...-0025 and on FEMA's Web site at http://www.fema.gov . You may also view a hard copy of the final policy...-declared major disaster or emergency, supplemental Federal disaster grant assistance for the repair, replacement, or restoration of disaster damaged, publicly-owned facilities and the facilities of certain...
ERIC Educational Resources Information Center
Jolicoeur, Mark; Kahl, Melanie
2010-01-01
More than 10 years ago, the U.S. Department of Education estimated that the average age of American school facilities was 40 years. With the slowing education construction market, one can assume that this age is continuing to rise. And this system of aging school facilities begs the question: Renovate or replace? When schools are looking at their…
ETR CRITICAL FACILITY (ETRCF), TRA654. SOUTH SIDE. CAMERA FACING NORTH ...
ETR CRITICAL FACILITY (ETR-CF), TRA-654. SOUTH SIDE. CAMERA FACING NORTH AND ROLL-UP DOOR. ORIGINAL SIDING HAS BEEN REPLACED WITH STUCCO-LIKE MATERIAL. INL NEGATIVE NO. HD46-40-1. Mike Crane, Photographer, 4/2005 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... and parking apron improvements; construction of additional bachelor enlisted quarters (BEQs... MCB Hawaii Kaneohe Bay, types of basing facilities that are required, improvements at training areas... construction, replacement, and renovation of facilities at MCB Hawaii Kaneohe Bay, and include improvements to...
36 CFR 1254.10 - For how long and where is my researcher identification card valid?
Code of Federal Regulations, 2010 CFR
2010-07-01
... facilities in the Washington, DC, area and other NARA facilities that issue and use plastic researcher identification cards as part of their security systems, we issue a plastic card to replace the paper card issued... ARCHIVES AND RECORDS ADMINISTRATION PUBLIC AVAILABILITY AND USE USING RECORDS AND DONATED HISTORICAL...
Reliability and Maintainability Analysis of a High Air Pressure Compressor Facility
NASA Technical Reports Server (NTRS)
Safie, Fayssal M.; Ring, Robert W.; Cole, Stuart K.
2013-01-01
This paper discusses a Reliability, Availability, and Maintainability (RAM) independent assessment conducted to support the refurbishment of the Compressor Station at the NASA Langley Research Center (LaRC). The paper discusses the methodologies used by the assessment team to derive the repair by replacement (RR) strategies to improve the reliability and availability of the Compressor Station (Ref.1). This includes a RAPTOR simulation model that was used to generate the statistical data analysis needed to derive a 15-year investment plan to support the refurbishment of the facility. To summarize, study results clearly indicate that the air compressors are well past their design life. The major failures of Compressors indicate that significant latent failure causes are present. Given the occurrence of these high-cost failures following compressor overhauls, future major failures should be anticipated if compressors are not replaced. Given the results from the RR analysis, the study team recommended a compressor replacement strategy. Based on the data analysis, the RR strategy will lead to sustainable operations through significant improvements in reliability, availability, and the probability of meeting the air demand with acceptable investment cost that should translate, in the long run, into major cost savings. For example, the probability of meeting air demand improved from 79.7 percent for the Base Case to 97.3 percent. Expressed in terms of a reduction in the probability of failing to meet demand (1 in 5 days to 1 in 37 days), the improvement is about 700 percent. Similarly, compressor replacement improved the operational availability of the facility from 97.5 percent to 99.8 percent. Expressed in terms of a reduction in system unavailability (1 in 40 to 1 in 500), the improvement is better than 1000 percent (an order of magnitude improvement). It is worthy to note that the methodologies, tools, and techniques used in the LaRC study can be used to evaluate similar high value equipment components and facilities. Also, lessons learned in data collection and maintenance practices derived from the observations, findings, and recommendations of the study are extremely important in the evaluation and sustainment of new compressor facilities.
Embedded piezoelectrics for sensing and energy harvesting in total knee replacement units
NASA Astrophysics Data System (ADS)
Wilson, Brooke E.; Meneghini, Michael; Anton, Steven R.
2015-04-01
The knee replacement is the second most common orthopedic surgical intervention in the United States, but currently only 1 in 5 knee replacement patients are satisfied with their level of pain reduction one year after surgery. It is imperative to make the process of knee replacement surgery more objective by developing a data driven approach to ligamentous balance, which increases implant life. In this work, piezoelectric materials are considered for both sensing and energy harvesting applications in total knee replacement implants. This work aims to embed piezoelectric material in the polyethylene bearing of a knee replacement unit to act as self-powered sensors that will aid in the alignment and balance of the knee replacement by providing intraoperative feedback to the surgeon. Postoperatively, the piezoelectric sensors can monitor the structural health of the implant in order to perceive potential problems before they become bothersome to the patient. Specifically, this work will present on the use of finite element modeling coupled with uniaxial compression testing to prove that piezoelectric stacks can be utilized to harvest sufficient energy to power sensors needed for this application.
Performance testing of a prototype Pd-Ag diffuser
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morgan, G. A.; Hodge, B. J.
The fusion fuel cycle has gained significant attention over the last decade as interest in fusion programs has increased. One of the critical components of the fusion process is the tritium fuel cycle. The tritium fuel cycle is designed to supply and recycle process tritium at a specific throughput rate. One of the most important processes within the tritium fuel cycle is the clean-up of the of the process tritium. This step will initially separate the hydrogen isotopes (H2, D2, and T2) from the rest of the process gas using Pd-Ag diffusers or permeators. The Pd-Ag diffuser is an integralmore » component for any tritium purification system; whether part of the United States’ defense mission or fusion programs. Domestic manufacturers of Pd-Ag diffusers are extremely limited and only a few manufacturers exist. Johnson-Matthey (JM) Pd-Ag diffusers (permeators) have previously been evaluated for the separation of hydrogen isotopes from non-hydrogen gas species in the process. JM is no longer manufacturing Pd-Ag diffusers and a replacement vendor needs to be identified to support future needs. A prototype Pd-Ag diffuser has been manufactured by Power and Energy, and is considered a potential replacement for the JM diffuser for tritium service. New diffuser designs for a tritium facility for any fusion energy applications must be characterized by evaluating their operating envelope prior to installation in a tritium processing facility. The prototype Pd-Ag diffuser was characterized to determine the overall performance as a function of the permeation of hydrogen through the membrane. The tests described in this report consider the effects of feed gas compositions, feed flow rates, pump configuration and internal tube pressure on the permeation of H2 through the Pd-Ag tubes.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... renewable biomass as a replacement fuel source for fossil fuels used to provide process heat or power in the... Farm Bill) (Pub. L. 110-246), to replace the use of fossil fuels used to produce heat or power at their... to a biorefinery taking into consideration the percentage reduction in fossil fuel used by the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... renewable biomass as a replacement fuel source for fossil fuels used to provide process heat or power in the... Bill) (Pub. L. 110-246), to replace the use of fossil fuels used to produce heat or power at their... reduction in fossil fuel used by the biorefinery (including the quantity of fossil fuels a renewable biomass...
New Phone System Coming to NCI Campus at Frederick | Poster
By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current
Relationship of patient volume and service concentration with outcome in geriatric rehabilitation.
Holstege, Marije S; Zekveld, Ineke G; Caljouw, Monique A A; Peerenboom, Peter Bob; van Balen, Romke; Gussekloo, Jacobijn; Achterberg, Wilco P
2013-10-01
Although geriatric rehabilitation (GR) is beneficial for restoration of activities and participation after hospitalization of vulnerable older persons, little is known about the optimal organization of care of these postacute facilities. This study examines the relationship of patient volume and service concentration with successful GR (short length of stay and discharge home) in skilled nursing facilities (SNFs). A national multicenter retrospective cohort study. All patients indicated for GR in a Dutch SNF. Nurses filled out digital registration forms from patient records. Patients were studied in 3 predefined diagnostic groups: total joint replacement, traumatic injuries, and stroke. Facility characteristics were obtained by structured telephone interviews with facility managers. Volume was based on the number of discharges in a 3-month period and categorized in low-, medium-, and high-volume facilities. Concentration was defined at the organizational level in which the population consists of 80% or more of 1 or 2 diagnostic groups, with the prerequisite of having a minimum of 10 rehabilitation beds. From 88 facilities, 2269 GR patients (mean age 78.2 years [SD 9.7]; 68.2% female) were included. The median length of stay in the SNF was 45 days (interquartile range 23-81), 57% of the patients were discharged home, and 9.8% died during GR. Of patients with total joint replacement (n = 501), concentration was related to successful rehabilitation (odds ratio 5.7; 95% confidence interval 1.3-24.3; P = .020, adjusted for age and gender); this relationship was not found for patients with traumatic injuries or stroke. Volume showed no relation with successful rehabilitation in any of the 3 diagnostic groups. This study may indicate that concentration in an SNF, as a proxy for specialization, favors successful GR in total joint replacement. This relationship was not found for the traumatic injuries or stroke groups, or for volume. The relation on functional outcome in GR needs further investigation. Copyright © 2013 American Medical Directors Association, Inc. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Steele, John; Chullen, Cinda; Morenz, Jesse; Stephenson, Curtis
2010-01-01
Freon-113(TradeMark) has been used as a chemistry lab sampling solvent at NASA/JSC for EMU (extravehicular Mobility Unit) SOP (Secondary Oxygen Pack) oxygen testing Cold Traps utilized at the USA (United Space Alliance) Houston facility. Similar testing has occurred at the HSWL (Hamilton Sundstrand Windsor Locks) facility. A NASA Executive Order bans the procurement of all ODS (ozone depleting substances), including Freon-113 by the end of 2009. In order to comply with NASA direction, HSWL began evaluating viable solvents to replace Freon-113 . The study and testing effort to find Freon-113 replacements used for Cold Trap sampling is the subject of this paper. Test results have shown HFE-7100 (a 3M fluorinated ether) to be an adequate replacement for Freon-113 as a solvent to remove and measure the non-volatile residue collected in a Cold Trap during oxygen testing. Furthermore, S-316 (a Horiba Instruments Inc. high molecular weight, non-ODS chlorofluorocarbon) was found to be an adequate replacement for Freon-113 as a solvent to reconstitute non-volatile residue removed from a Cold Trap during oxygen testing for subsequent HC (hydrocarbon) analysis via FTIR (Fourier Transform Infrared Spectroscopy).
Installation of a second superconducting wiggler at SAGA-LS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.
The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of themore » vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.« less
Operating manual for the R100 digital vibration-time totalizer
Cordes, Edwin H.; Shi, Minghua
1988-01-01
A vibration sensor that monitors the running time of pumps to determine water withdrawal by various public-supply, agricultural, and industrial groups has been developed in response to a need demonstrated by data gathering activities of the U.S. Geological Survey 's National Water Use Information Program. This sensor, the R100 digital vibration-time totalizer, attaches to monitored equipment such as a pump, motor, or pipe facility and senses vibration to determine running time. Battery-powered and packaged for field environment, the R100 can be left unattended for up to 1 year. Time is recorded to the nearest 0.01 hour, or 36 seconds. This operating manual for the R100 digital vibration-time totalizer describes the R100 's principal of operation and gives installation guidelines and instructions for battery replacements. (USGS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ponce, Dan; Brambila, Rigo E.; Cengher, Mirela
The ECH Group at DIII-D has installed in-house engineered, FPGA-based, high voltage reference waveform generators on its gyrotron control systems to enhance the capabilities of the systems and replace obsolete equipment. The new hardware, named D-Wavegen, outputs 16-bit signals every microsecond and can respond to events and anomalies in real-time. These generators have been reliably pausing gyrotron rf output during periods of DIII-D plasma density that exceed the fault density trip level and restarting the rf output if the density falls below the trip level. While tightly monitoring gyrotron body current and internal pressure, D-Wavegen has also been reliably restarting,more » in a little over 10ms, gyrotrons that spontaneously ceased rf generation.« less
NASA Technical Reports Server (NTRS)
Dasgupta, Partha; Leblanc, Richard J., Jr.; Appelbe, William F.
1988-01-01
Clouds is an operating system in a novel class of distributed operating systems providing the integration, reliability, and structure that makes a distributed system usable. Clouds is designed to run on a set of general purpose computers that are connected via a medium-of-high speed local area network. The system structuring paradigm chosen for the Clouds operating system, after substantial research, is an object/thread model. All instances of services, programs and data in Clouds are encapsulated in objects. The concept of persistent objects does away with the need for file systems, and replaces it with a more powerful concept, namely the object system. The facilities in Clouds include integration of resources through location transparency; support for various types of atomic operations, including conventional transactions; advanced support for achieving fault tolerance; and provisions for dynamic reconfiguration.
Ponce, Dan; Brambila, Rigo E.; Cengher, Mirela; ...
2017-10-19
The ECH Group at DIII-D has installed in-house engineered, FPGA-based, high voltage reference waveform generators on its gyrotron control systems to enhance the capabilities of the systems and replace obsolete equipment. The new hardware, named D-Wavegen, outputs 16-bit signals every microsecond and can respond to events and anomalies in real-time. These generators have been reliably pausing gyrotron rf output during periods of DIII-D plasma density that exceed the fault density trip level and restarting the rf output if the density falls below the trip level. While tightly monitoring gyrotron body current and internal pressure, D-Wavegen has also been reliably restarting,more » in a little over 10ms, gyrotrons that spontaneously ceased rf generation.« less
Power Burst Facility (PBF), PER620, contextual and oblique view. Camera ...
Power Burst Facility (PBF), PER-620, contextual and oblique view. Camera facing northwest. South and east facade. The 1980 west-wing expansion is left of center bay. Concrete structure at right is PER-730. Date: March 2004. INEEL negative no. HD-41-2-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...
Evaluation of high-voltage, high-power, solid-state remote power controllers for amps
NASA Technical Reports Server (NTRS)
Callis, Charles P.
1987-01-01
The Electrical Power Branch at Marshall Space Flight Center has a Power System Development Facility where various power circuit breadboards are tested and evaluated. This project relates to the evaluation of a particular remote power controller (RPC) energizing high power loads. The Facility equipment permits the thorough testing and evaluation of high-voltage, high-power solid-state remote power controllers. The purpose is to evaluate a Type E, 30 Ampere, 200 V dc remote power controller. Three phases of the RPC evaluation are presented. The RPC is evaluated within a low-voltage, low-power circuit to check its operational capability. The RPC is then evaluated while performing switch/circuit breaker functions within a 200 V dc, 30 Ampere power circuit. The final effort of the project relates to the recommended procedures for installing these RPC's into the existing Autonomously Managed Power System (AMPS) breadboard/test facility at MSFC.
A facility for testing 10 to 100-kWe space power reactors
NASA Astrophysics Data System (ADS)
Carlson, William F.; Bitten, Ernest J.
1993-01-01
This paper describes an existing facility that could be used in a cost-effective manner to test space power reactors in the 10 to 100-kWe range before launch. The facility has been designed to conduct full power tests of 100-kWe SP-100 reactor systems and already has the structural features that would be required for lower power testing. The paper describes a reasonable scenario starting with the acceptance at the test site of the unfueled reactor assembly and the separately shipped nuclear fuel. After fueling the reactor and installing it in the facility, cold critical tests are performed, and the reactor is then shipped to the launch site. The availability of this facility represents a cost-effective means of performing the required prelaunch test program.
Nuclear electric propulsion development and qualification facilities
NASA Technical Reports Server (NTRS)
Dutt, D. S.; Thomassen, K.; Sovey, J.; Fontana, Mario
1991-01-01
This paper summarizes the findings of a Tri-Agency panel consisting of members from the National Aeronautics and Space Administration (NASA), U.S. Department of Energy (DOE), and U.S. Department of Defense (DOD) that were charged with reviewing the status and availability of facilities to test components and subsystems for megawatt-class nuclear electric propulsion (NEP) systems. The facilities required to support development of NEP are available in NASA centers, DOE laboratories, and industry. However, several key facilities require significant and near-term modification in order to perform the testing required to meet a 2014 launch date. For the higher powered Mars cargo and piloted missions, the priority established for facility preparation is: (1) a thruster developmental testing facility, (2) a thruster lifetime testing facility, (3) a dynamic energy conversion development and demonstration facility, and (4) an advanced reactor testing facility (if required to demonstrate an advanced multiwatt power system). Facilities to support development of the power conditioning and heat rejection subsystems are available in industry, federal laboratories, and universities. In addition to the development facilities, a new preflight qualifications and acceptance testing facility will be required to support the deployment of NEP systems for precursor, cargo, or piloted Mars missions. Because the deployment strategy for NEP involves early demonstration missions, the demonstration of the SP-100 power system is needed by the early 2000's.
Feasibility Investigation for a Solar Power Generation Facility
NASA Technical Reports Server (NTRS)
Nathan, Lakshmi
2010-01-01
The Energy Policy Act of 2005 states that by fiscal year 2013, at least 7.5% of the energy consumed by the government must be renewable energy. In an effort to help meet this goal, Johnson Space Center (JSC) is considering installing a solar power generation facility. The purpose of this project is to conduct a feasibility investigation for such a facility. Because Kennedy Space Center (KSC) has a solar power generation facility, the first step in this investigation is to learn about KSC's facility and obtain information on how it was constructed. After collecting this information, the following must be determined: the amount of power desired, the size of the facility, potential locations for it, and estimated construction and maintenance costs. Contacts with JSC's energy provider must also be established to determine if a partnership would be agreeable to both parties. Lastly, all of this data must be analyzed to decide whether or not JSC should construct the facility. The results from analyzing the data collected indicate that a 200 kW facility would provide enough energy to meet 1% of JSC's energy demand. This facility would require less than 1 acre of land. In the map below, potential locations are shown in green. The solar power facility is projected to cost $2 M. So far, the information collected indicates that such a facility could be constructed. The next steps in this investigation include contacting JSC's energy provider, CenterPoint Energy, to discuss entering a partnership; developing a life cycle cost analysis to determine payback time; developing more detailed plans; and securing funding.
NASA Technical Reports Server (NTRS)
Dudley, Stephanie R. B.; Marsh, Angela L.
2014-01-01
With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.
Research and Development for an Alternative RF Source Using Magnetrons in CEBAF
NASA Astrophysics Data System (ADS)
Jacobs, Andrew
2016-09-01
At Jefferson Lab, klystrons are currently used as a radiofrequency (RF) power source for the 1497 MHz Continuous Electron Beam Accelerator Facility (CEBAF) Continuous Wave (CW) system. A drop-in replacement for the klystrons in the form of a system of magnetrons is being developed. The klystron DC-RF efficiency at CEBAF is 35-51% while the estimated magnetron efficiency is 80-90%. Thus, the introduction of magnetrons to CEBAF will have enormous benefits in terms of electrical power saving. The primary focus of this project was to characterize a magnetron's frequency pushing and pulling curves at 2.45 GHz with stub tuner and anode current adjustments so that a Low Level RF controller for a new 1.497 GHz magnetron can be built. A Virtual Instrument was created in LabVIEW, and data was taken. The resulting data allowed for the creation of many constant lines of frequency and output power. Additionally, the results provided a characterization of magnetron oven temperature drift over the operation time and the relationship between anode current and frequency. Using these results, the control model of different variables and their feedback or feedforward that affect the frequency pushing and pulling of the magnetron is better developed. Department of Energy, Science Undergraduate Laboratory Internships, and Jefferson Lab.
ERDA/Lewis research center photovoltaic systems test facility
NASA Technical Reports Server (NTRS)
Forestieri, A. F.; Johnson, J. A.; Knapp, W. D.; Rigo, H.; Stover, J.; Suhay, R.
1977-01-01
A national photovoltaic power systems test facility (of initial 10-kW peak power rating) is described. It consists of a solar array to generate electrical power, test-hardware for several alternate methods of power conversion, electrical energy storage systems, and an instrumentation and data acquisition system.
Thermal Modeling for Pulsed Inductive FRC Plasmoid Thrusters
NASA Astrophysics Data System (ADS)
Pfaff, Michael
Due to the rising importance of space based infrastructure, long-range robotic space missions, and the need for active attitude control for spacecraft, research into Electric Propulsion is becoming increasingly important. Electric Propulsion (EP) systems utilize electric power to accelerate ions in order to produce thrust. Unlike traditional chemical propulsion, this means that thrust levels are relatively low. The trade-off is that EP thrusters have very high specific impulses (Isp), and can therefore make do with far less onboard propellant than cold gas, monopropellant, or bipropellant engines. As a consequence of the high power levels used to accelerate the ionized propellant, there is a mass and cost penalty in terms of solar panels and a power processing unit. Due to the large power consumption (and waste heat) from electric propulsion thrusters, accurate measurements and predictions of thermal losses are needed. Excessive heating in sensitive locations within a thruster may lead to premature failure of vital components. Between the fixed cost required to purchase these components, as well as the man-hours needed to assemble (or replace) them, attempting to build a high-power thruster without reliable thermal modeling can be expensive. This paper will explain the usage of FEM modeling and experimental tests in characterizing the ElectroMagnetic Plasmoid Thruster (EMPT) and the Electrodeless Lorentz Force (ELF) thruster at the MSNW LLC facility in Redmond, Washington. The EMPT thruster model is validated using an experimental setup, and steady state temperatures are predicted for vacuum conditions. Preliminary analysis of the ELF thruster indicates possible material failure in absence of an active cooling system for driving electronics and for certain power levels.
Technical Report from Grant Recipient - City of Redlands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giorgianni, Kathleen Margaret
2016-05-26
The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).
40 CFR 60.480 - Applicability and designation of affected facility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... subpart. (c) Addition or replacement of equipment for the purpose of process improvement which is... all equipment (defined in § 60.481) within a process unit is an affected facility. (b) Any affected... the definition of “process unit” in § 60.481 and the requirements in § 60.482-1(g) of this subpart...
Instrument Systems Analysis and Verification Facility (ISAVF) users guide
NASA Technical Reports Server (NTRS)
Davis, J. F.; Thomason, J. O.; Wolfgang, J. L.
1985-01-01
The ISAVF facility is primarily an interconnected system of computers, special purpose real time hardware, and associated generalized software systems, which will permit the Instrument System Analysts, Design Engineers and Instrument Scientists, to perform trade off studies, specification development, instrument modeling, and verification of the instrument, hardware performance. It is not the intent of the ISAVF to duplicate or replace existing special purpose facilities such as the Code 710 Optical Laboratories or the Code 750 Test and Evaluation facilities. The ISAVF will provide data acquisition and control services for these facilities, as needed, using remote computer stations attached to the main ISAVF computers via dedicated communication lines.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... replacement of the power control relays in the P91 and P92 power distribution panels for the fuel boost and override pumps with new, improved relays having a ground fault interrupter (GFI) feature, or installation... specify which relays may be replaced by GFIs or UFIs. We are proposing this AD to prevent pump housing...
Description of the PMAD systems test bed facility and data system
NASA Technical Reports Server (NTRS)
Trase, Larry; Fong, Don; Adkins, Vicki; Birchenough, Arthur
1992-01-01
The power management and distribution (PMAD) systems test bed facility, including the power sources and loads available, is discussed, and the PMAD data system (PDS) is described. The PDS controls the test-bed facility hardware, and monitors and records the electric power system control data bus and external data. The PDS architecture is discussed, and each of the subsystems is described.
Space power distribution system technology. Volume 3: Test facility design
NASA Technical Reports Server (NTRS)
Decker, D. K.; Cannady, M. D.; Cassinelli, J. E.; Farber, B. F.; Lurie, C.; Fleck, G. W.; Lepisto, J. W.; Messner, A.; Ritterman, P. F.
1983-01-01
The AMPS test facility is a major tool in the attainment of more economical space power. The ultimate goals of the test facility, its primary functional requirements and conceptual design, and the major equipment it contains are discussed.
JESS facility modification and environmental/power plans
NASA Technical Reports Server (NTRS)
Bordeaux, T. A.
1984-01-01
Preliminary plans for facility modifications and environmental/power systems for the JESS (Joint Exercise Support System) computer laboratory and Freedom Hall are presented. Blueprints are provided for each of the facilities and an estimate of the air conditioning requirements is given.
Stochastic Modelling of Wireless Energy Transfer
NASA Technical Reports Server (NTRS)
Veilleux, Shaun; Almaghasilah, Ahmed; Abedi, Ali; Wilkerson, DeLisa
2017-01-01
This study investigates the efficiency of a new method of powering remote sensors by the means of wireless energy transfer. The increased use of sensors for data collection comes with the inherent cost of supplying power from sources such as power cables or batteries. Wireless energy transfer technology eliminates the need for power cables or periodic battery replacement. The time and cost of setting up or expanding a sensor network will be reduced while allowing sensors to be placed in areas where running power cables or battery replacement is not feasible. This paper models wireless channels for power and data separately. Smart scheduling for the data channel is proposed to avoid transmitting data on a noisy channel where the probability of data loss is high to improve power efficiency. Analytical models have been developed and verified using simulations.
2-kW Solar Dynamic Space Power System Tested in Lewis' Thermal Vacuum Facility
NASA Technical Reports Server (NTRS)
1995-01-01
Working together, a NASA/industry team successfully operated and tested a complete solar dynamic space power system in a large thermal vacuum facility with a simulated sun. This NASA Lewis Research Center facility, known as Tank 6 in building 301, accurately simulates the temperatures, high vacuum, and solar flux encountered in low-Earth orbit. The solar dynamic space power system shown in the photo in the Lewis facility, includes the solar concentrator and the solar receiver with thermal energy storage integrated with the power conversion unit. Initial testing in December 1994 resulted in the world's first operation of an integrated solar dynamic system in a relevant environment.
76 FR 20052 - Notice of Issuance of Regulatory Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... Guide 1.149, ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License..., ``Nuclear Power Plant Simulation Facilities for Use in Operator Training, License Examinations, and... simulation facility for use in operator and senior operator training, license examination operating tests...
Packaging, Transportation and Recycling of NPP Condenser Modules - 12262
DOE Office of Scientific and Technical Information (OSTI.GOV)
Polley, G.M.
2012-07-01
Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged inmore » inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)« less
Social support and actual versus expected length of stay in inpatient rehabilitation facilities
Lewis, Zakkoyya H.; Hay, Catherine Cooper; Graham, James E.; Lin, Yu-Li; Karmarkar, Amol M.; Ottenbacher, Kenneth J.
2016-01-01
Objectives Describe impairment-specific patterns in shorter- and longer-than-expected lengths of stay in inpatient rehabilitation and examine the independent effects of social support on deviations from expected lengths of stay. Design Retrospective cohort study. Setting Inpatient rehabilitation facilities across the United States. Participants Medicare fee-for-service beneficiaries (N=119,437) who were discharged from inpatient rehabilitation facilities in 2012 following stroke, lower extremity fracture, or lower extremity joint replacement. Intervention Not applicable. Main Outcome Measure Relative length of stay (actual – expected). The Centers for Medicare and Medicaid Services posts annual expected lengths of stay based on patients’ clinical profiles at admission. We created a 3-category outcome variable: short, expected, long. Our primary independent variable (social support) also included 3 categories: family/friends, paid/other, none. Results Mean (SD) actual lengths of stay for joint replacement, fracture, and stroke were 9.8 (3.6), 13.8 (4.5), and 15.8 (7.3) days, respectively; relative lengths of stay were −1.2 (3.1), −1.6 (3.7), and −1.7 (5.2) days. Nearly half of patients (47–48%) were discharged more than 1 day earlier than expected in all 3 groups, whereas 14% of joint replacement, 15% of fracture, and 20% of stroke patients were discharged more than 1 day later than expected. In multinomial regression analysis, using family/friends as the reference group, paid/other support was associated (p<.05) with higher odds of long stays in joint replacement. No social support was associated with lower odds of short stays in all 3 impairment groups and higher odds of long stays in fracture and joint replacement. Conclusion Inpatient rehabilitation experiences and outcomes can be substantially impacted by a patient’s level of social support. More research is needed to better understand these relationships and possible unintended consequences in terms of patient access issues and provider-level quality measures. PMID:27373747
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is unveiled at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is ready for operation at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility opens at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Analysis of S-band solid-state transmitters for the solar power satellite
NASA Technical Reports Server (NTRS)
Belohoubek, E. F.; Ettenberg, M.; Huang, H. C.; Nowogrodzki, M.; Sechi, F. N.
1979-01-01
The possibility of replacing the Reference System antenna in which thermionic devices are used for the dc-to-microwave conversion, with solid-state elements was explored. System, device, and antenna module tradeoff investigations strongly point toward the desirability of changing the transmitter concept to a distributed array of relatively low power elements, deriving their dc power directly from the solar cell array and whose microwave power outputs are combined in space. The approach eliminates the thermal, weight, and dc-voltage distribution problems of a system in which high power tubes are simply replaced with clusters of solid state amplifiers. The proposed approach retains the important advantages of a solid state system: greatly enhanced reliability and graceful degradation of the system.
Microprocessor-based control systems application in nuclear power plant critical systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shah, M.R.; Nowak, J.B.
Microprocessor-based control systems have been used in fossil power plants and are receiving greater acceptance for application in nuclear plants. This technology is not new but it does require unique considerations when applied to nuclear power plants. Sargent and Lundy (S and L) has used a microprocessor-based component logic control system (interposing Logic System) for safety- and non-safety-related components in nuclear power plants under construction overseas. Currently, S and L is in the design stage to replace an existing analog control system with a microprocessor-based control system in the U.S. The trend in the industry is to replace systems inmore » existing plants or design new power plants with microprocessor-based control systems.« less
Control System Upgrade for a Mass Property Measurement Facility
NASA Technical Reports Server (NTRS)
Chambers, William; Hinkle, R. Kenneth (Technical Monitor)
2002-01-01
The Mass Property Measurement Facility (MPMF) at the Goddard Space Flight Center has undergone modifications to ensure the safety of Flight Payloads and the measurement facility. The MPMF has been technically updated to improve reliability and increase the accuracy of the measurements. Modifications include the replacement of outdated electronics with a computer based software control system, the addition of a secondary gas supply in case of a catastrophic failure to the gas supply and a motor controlled emergency stopping feature instead of a hard stop.
New radiation protection calibration facility at CERN.
Brugger, Markus; Carbonez, Pierre; Pozzi, Fabio; Silari, Marco; Vincke, Helmut
2014-10-01
The CERN radiation protection group has designed a new state-of-the-art calibration laboratory to replace the present facility, which is >20 y old. The new laboratory, presently under construction, will be equipped with neutron and gamma sources, as well as an X-ray generator and a beta irradiator. The present work describes the project to design the facility, including the facility placement criteria, the 'point-zero' measurements and the shielding study performed via FLUKA Monte Carlo simulations. © The Author 2013. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cle Elum Supplementation and Research Facility
FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers tomore » be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...
Code of Federal Regulations, 2012 CFR
2012-07-01
... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...
Code of Federal Regulations, 2011 CFR
2011-07-01
... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...
Code of Federal Regulations, 2014 CFR
2014-07-01
... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...
Code of Federal Regulations, 2013 CFR
2013-07-01
... replacements • Customer located power generation based on photovoltaic, solar thermal, biomass, wind or geothermal resources • Swimming pool pump replacements • Gasket replacements • Maintenance/coil cleaning 1... photovoltaic, solar thermal, biomass, wind, and geothermal resources • Energy efficient office equipment...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
... Atomic Electric Company, Yankee Nuclear Power Station, Confirmatory Order Modifying License (Effective... of 10 CFR part 72, Subpart K at the Yankee Nuclear Power Station. The facility is located at the... Facility Operating License for Yankee Nuclear Power Station must be modified to include provisions with...
Droplet Combustion and Non-Reactive Shear-Coaxial Jets with Transverse Acoustic Excitation
2012-06-01
Shear-Coaxial Jets Experimental Facility: Piping and Instrumentation Diagram . . . . . . . . . . . . . . . . . . . . . . 196 B Shear-Coaxial Jets...facility piping and instrumentation diagram. . . . . . . . . 197 A.2 Expanded view of section A in Figure A.1. . . . . . . . . . . . . . . . . . 198 A.3...certified to be used in flexible fuel vehicles (FFVs) with engines specifically designed for this fuel. As for possible aviation fuel replacements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-09
... subparagraph (4)(b)4, relating to sulfur dioxide, to correct an error in the standard condition for temperature... subparagraph (b)5(i) to clarify the specific equipment covered by permit-by-rule for hot mix asphalt plants... million BtU per hour'' is replaced by ``hot mix asphalt facilities,'' to best describe the facilities...
Environmental Assessment for the Replacement of Water Reservoirs
2005-03-25
Intensive extraction of groundwater does not occur at Travis because of poor water- bearing subsurface geology. Intensive extraction SECTION 3.0...largest contiguous estuarine marsh and the largest wetland in the continental United States (CH2M HILL, 2001). Suisun Marsh drains into Grizzly and...and other support facilities. • Community (Commercial) – Uses include the exchange, commissary, banking, dining facilities, eating
Decomposing racial and ethnic disparities in the use of postacute rehabilitation care.
Holmes, George M; Freburger, Janet K; Ku, Li-Jung E
2012-06-01
To determine the degree to which racial and ethnic disparities in the use of postacute rehabilitation care (PARC) are explained by observed characteristics. State inpatient databases (SIDs) for 2005 and 2006 from four diverse states were used to identify patients with stays for joint replacement, stroke, or hip fracture. Our primary outcomes were use of institutional PARC (versus discharge home) and, conditional on discharge to an institution, skilled nursing facility (versus inpatient rehabilitation facility) care. We modified the Oaxaca-Blinder decomposition method to account for the dichotomous outcome and multilevel nature of the data. Discharges from the four SIDs were included if the principal diagnosis (stroke, hip fracture) or procedure (joint replacement) was in the sample inclusion criteria. Observed characteristics explained roughly half of the unadjusted differences in use of institutional PARC. Patient-level factors (clinical, age) were more explanatory of disparities in institutional PARC use, while hospital-level factors were more explanatory of skilled nursing facility versus inpatient rehabilitation facility care. Adjustment for characteristics influencing PARC use both mitigated and exacerbated racial/ethnic disparities in use. The degree to which the characteristics explained the disparity varied across conditions and outcomes. © Health Research and Educational Trust.
10 CFR 205.378 - Disconnection of temporary facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Disconnection of temporary facilities. 205.378 Section 205.378 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System... Electric Facilities and the Transfer of Electricity to Alleviate An Emergency Shortage of Electric Power...
Multimillion Dollar Construction Project Completed in Glenn's Icing Research Tunnel
NASA Technical Reports Server (NTRS)
Kevdzija, Susan L.
2001-01-01
Over the last year, the Glenn Research Center's Icing Research Tunnel (IRT) underwent a major $5.2 million rehabilitation project as part of the Construction of Facilities program. The scope of the project included redesign and replacement of the 55-yr-old heat exchanger, the addition of fan outlet guide vanes for flow conditioning downstream of the 25-ft-diameter fan, and redesign and replacement of the C and D corner-turning vanes. The purpose of the rehabilitation was to replace old portions of the infrastructure and to improve the aerodynamic flow quality in the tunnel.
2003-12-17
KENNEDY SPACE CENTER, FLA. -- A new control tower is nearing completion at the KSC Shuttle Landing Facility. It will replace the old tower in use since 1987. The old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower have been hindered by the eight-billion candlepower xenon lights that illuminate the runway. The new control tower is built atop an existing mound, rising nearly 100 feet over the midpoint of the runway. The height gives controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County. The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology. Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.
2003-12-17
KENNEDY SPACE CENTER, FLA. -- The existing control tower seen here at the edge of the KSC Shuttle Landing Facility is being replaced. In use since 1987, the old tower stands only 20 feet above the runway surface, too low to see the launch pads to the east. During nighttime landing operations, those inside the tower have been hindered by the eight-billion candlepower xenon lights that illuminate the runway. The new control tower is built atop an existing mound, rising nearly 100 feet over the midpoint of the runway. The height gives controllers a spectacular 360-degree view of NASA-KSC and northern Brevard County. The new facility will also replace the SLF Operations Building. The operations building is home to the Military Radar Unit that monitors NASA-KSC airspace 24 hours a day, as well as runway light controls, navigational aids, weather and wind speed instrumentation, and gate controls. In the new tower, the computer displays will be fully modernized to Federal Aviation Administration standards with touch-screen technology. Construction on the new facility began in February 2003 and is nearly ready for occupancy. Only some final inspections and approvals remain. A support building and Public Affairs viewing deck, to be used for observing future landing operations, will be added and are already in work.
Final Environmental Assessment: Replace Hanscom AFB Middle School
2012-04-01
term impacts on wastewater facilities are anticipated during the demolition/construction of the Middle School. Portable toilets may be available for...7.14. CUMULATIVE IMPACTS 7-18 SECTION 8. MEASURES TO REDUCE POTENTIAL FOR IMPACT 8-1 SECTION 9. CONSULTATION LETTERS, EMAILS, AND PUBLIC NOTICE 9-1...U.S. Air Force April 2012 1 FINDING OF NO SIGNIFICANT IMPACT Name of Action: Replace Hanscom AFB Middle School Hanscom Air Force Base
2009-11-19
CAPE CANAVERAL, Fla. – NASA Kennedy Space Center Director Bob Cabana addresses the audience on hand for the unveiling of NASA's first large-scale solar power generation facility at Kennedy in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2004-01-27
KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins and Mission Specialist Wendy Lawrence look over mission equipment in the Space Station Processing Facility. Crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.
2004-01-27
KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas works on equipment in the Space Station Processing Facility. He and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holttinen, Hannele; Kiviluoma, Juha; McCann, John
2015-10-05
This paper presents ways of estimating CO2 reductions of wind power using different methodologies. Estimates based on historical data have more pitfalls in methodology than estimates based on dispatch simulations. Taking into account exchange of electricity with neighboring regions is challenging for all methods. Results for CO2 emission reductions are shown from several countries. Wind power will reduce emissions for about 0.3-0.4 MtCO2/MWh when replacing mainly gas and up to 0.7 MtCO2/MWh when replacing mainly coal powered generation. The paper focuses on CO2 emissions from power system operation phase, but long term impacts are shortly discussed.
2009-11-19
CAPE CANAVERAL, Fla. – Florida Power & Light Company Vice President and Chief Development Officer Eric Silagy, left, and NASA Kennedy Space Center Director Bob Cabana, center, examine one of the solar panels at the unveiling of NASA's first large-scale solar power generation facility at Kennedy in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
24 CFR 232.902 - Eligible project.
Code of Federal Regulations, 2010 CFR
2010-04-01
... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING... sufficient to pay operating expenses, annual debt service and reserve fund for replacement requirements) as...
76 FR 61346 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-04
... defense nuclear facilities, including the Chemistry and Metallurgy Research Building, Area G in Technical... the integration of safety-in-design for the Chemistry and Metallurgy Research Replacement project, the...
ERIC Educational Resources Information Center
Dolan, Thomas G.
2003-01-01
Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)
NASA Astrophysics Data System (ADS)
Takagi, Hirotaka; Sugiyama, Tomonari; Zashibo, Toshihito
Since its foundation, the power system of Chubu Electric Power Company (hereinafter CEPCO) has developed through power source and transmission facility formation to meet electricity demand increases. This development has been accompanied by progress in transmission technologies including capacity scale-up, compactification and power system stabilization to operate complex power systems. Now, changes in business situation due to electricity market liberalizatin may bring new challenges to future facility formation. This paper reviews CEPCO's history of power system formation and progress in transmission technologies, and describes future challenges.
2009-03-04
CAPE CANAVERAL, Fla. – At the Astrotech payload processing facility in Titusville, Fla., the GOES-O satellite will undergo final testing of the imaging system, instrumentation, communications and power systems. The latest Geostationary Operational Environmental Satellite, GOES-O was developed by NASA for the National Oceanic and Atmospheric Administration, or NOAA. The GOES-O satellite is targeted to launch April 28 onboard a United Launch Alliance Delta IV expendable launch vehicle. Once in orbit, GOES-O will be designated GOES-14, and NASA will provide on-orbit checkout and then transfer operational responsibility to NOAA. GOES-O will be placed in on-orbit storage as a replacement for an older GOES satellite. GOES-O carries an advanced attitude control system using star trackers with spacecraft optical bench Imager and Sounder mountings that provide enhanced instrument pointing performance for improved image navigation and registration to better locate severe storms and other events important to the NOAA National Weather Service. Photo credit: NASA/Kim Shiflett
Refrigeration oils for low GWP refrigerants in various applications
NASA Astrophysics Data System (ADS)
Saito, R.; Sundaresan, S. G.
2017-08-01
The practical use of the refrigeration systems is considered as a methods to suppress global warming. The replacement of a refrigerant with a new one that has lower global warming potential (GWP) has been underway for several years. For the application fields of refrigerators, domestic air conditioners, automotive air conditioners and hot water dispensers, the investigation has almost finished. It is still underway for the application fields of commercial air conditioners and chillers, refrigeration facilities for cold storage, etc. And now, the refrigeration system is being applied in various ways to decrease global warming above the generation of electric power with organic Rankine cycle, the binary electric generation with ground source heat pump, and so on. In these situations, various refrigerants are developed and several kinds of suitable refrigeration oils are selected. This paper presents the consideration of suitable refrigeration oil for the various low GWP refrigerants.
Peritoneal Dialysis in Austere Environments: An Emergent Approach to Renal Failure Management
Gorbatkin, Chad; Finkelstein, Fredric O.; Gorbatkin, Steven M.
2018-01-01
Peritoneal dialysis (PD) is a means of renal replacement therapy (RRT) that can be performed in remote settings with limited resources, including regions that lack electrical power. PD is a mainstay of end-stage renal disease (ESRD) therapy worldwide, and the ease of initiation and maintenance has enabled it to flourish in both resource-limited and resource-abundant settings. In natural disaster scenarios, military conflicts, and other austere areas, PD may be the only available life-saving measure for acute kidney injury (AKI) or ESRD. PD in austere environments is not without challenges, including catheter placement, availability of dialysate, and medical complications related to the procedure itself. However, when hemodialysis is unavailable, PD can be performed using generally available medical supplies including sterile tubing and intravenous fluids. Amidst the ever-increasing global burden of ESRD and AKI, the ability to perform PD is essential for many medical facilities. PMID:29760854
18 CFR 154.307 - Joint facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Joint facilities. 154.307 Section 154.307 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Changes § 154.307 Joint facilities. The Statements required by § 154.312 must show all costs (investment...
18 CFR 154.307 - Joint facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Joint facilities. 154.307 Section 154.307 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Changes § 154.307 Joint facilities. The Statements required by § 154.312 must show all costs (investment...
18 CFR 154.307 - Joint facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Joint facilities. 154.307 Section 154.307 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Changes § 154.307 Joint facilities. The Statements required by § 154.312 must show all costs (investment...
18 CFR 154.307 - Joint facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Joint facilities. 154.307 Section 154.307 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Changes § 154.307 Joint facilities. The Statements required by § 154.312 must show all costs (investment...
18 CFR 154.307 - Joint facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Joint facilities. 154.307 Section 154.307 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Changes § 154.307 Joint facilities. The Statements required by § 154.312 must show all costs (investment...
18 CFR 1304.205 - Other water-use facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Other water-use facilities. 1304.205 Section 1304.205 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... TVA-Owned Residential Access Shoreland § 1304.205 Other water-use facilities. (a) A marine railway or...
18 CFR 1304.205 - Other water-use facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Other water-use facilities. 1304.205 Section 1304.205 Conservation of Power and Water Resources TENNESSEE VALLEY AUTHORITY... TVA-Owned Residential Access Shoreland § 1304.205 Other water-use facilities. (a) A marine railway or...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... emergency operating procedures (EOP), and site survey monitoring that support modification of emergency plan... Power Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed... Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License...
78 FR 73144 - Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-05
..., ground-based enclosures, battery back-up power systems, grounding equipment, power transfer switch, and... No. 11-59; FCC 13-122] Acceleration of Broadband Deployment by Improving Wireless Facilities Siting... of new wireless facilities and on rules to implement statutory provisions governing State and local...
18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...
18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...
18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...
18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.
Code of Federal Regulations, 2012 CFR
2012-04-01
... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...
18 CFR 292.309 - Termination of obligation to purchase from qualifying facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small Power Production Facilities Under Section 210 of the Public... into a new contract or obligation to purchase electric energy from a qualifying cogeneration facility...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... Licenses I Carolina Power & Light Company (CP&L, the licensee) and North Carolina Eastern Municipal Power... operating licenses authorize CP&L to possess, use, and operate the Brunswick facility. II By application... indirect transfer of control of the facility operating licenses for Brunswick, to the extent held by CP&L...
DOE Office of Scientific and Technical Information (OSTI.GOV)
William W. Glauz
The Los Angeles Department of Water and Power (LADWP) has developed one of the most recognized fuel cell demonstration programs in the United States. In addition to their high efficiencies and superior environmental performance, fuel cells and other generating technologies that can be located at or near the load, offers several electric utility benefits. Fuel cells can help further reduce costs by reducing peak electricity demand, thereby deferring or avoiding expenses for additional electric utility infrastructure. By locating generators near the load, higher reliability of service is possible and the losses that occur during delivery of electricity from remote generatorsmore » are avoided. The potential to use renewable and locally available fuels, such as landfill or sewage treatment waste gases, provides another attractive outlook. In Los Angeles, there are also many oil producing areas where the gas by-product can be utilized. In June 2000, the LADWP contracted with FCE to install and commission the precommercial 250kW MCFC power plant. The plant was delivered, installed, and began power production at the JFB in August 2001. The plant underwent manufacturer's field trials up for 18 months and was replace with a commercial plant in January 2003. In January 2001, the LADWP contracted with FCE to provide two additional 250kW MCFC power plants. These commercial plants began operations during mid-2003. The locations of these plants are at the Terminal Island Sewage Treatment Plant at the Los Angeles Harbor (for eventual operation on digester gas) and at the LADWP Main Street Service Center east of downtown Los Angeles. All three carbonate fuel cell plants received partial funding through the Department of Defense's Climate Change Fuel Cell Buydown Program. This report covers the technical evaluation and benefit-cost evaluation of the Main Street 250kW MCFC power plant during its first year of operation from September 2003 to August 2004. The data for the month of September 2004 was not available at the time this report was prepared. An addendum to this report will be prepared and transmitted to the Department of Energy once this data becomes available. This fuel cell power plant was originally intended to be installed at an American Airlines facility located at Los Angeles International Airport, however, due to difficulties in obtaining a site, the plant was ultimately installed at the LADWP's Distributed Generation Test Facility at it's Main Street Service Center.« less
ERIC Educational Resources Information Center
Faggella-Luby, Michael N.; Graner, Patricia Sampson; Deshler, Donald D.; Drew, Sally Valentino
2012-01-01
There is growing interest in disciplinary literacy instruction as a primary means of improving adolescent literacy outcomes. At times, this disciplinary framework has been represented as a replacement for the more broadly known general strategy instruction. However, disciplinary literacy, a potentially powerful idea, cannot replace general…
Preliminary plan for testing a thermionic reactor in the Plum Brook Space Power Facility
NASA Technical Reports Server (NTRS)
Haley, F. A.
1972-01-01
A preliminary plan is presented for testing a thermionic reactor in the Plum Brook Space Power Facility (SPF). A technical approach, cost estimate, manpower estimate, and schedule are presented to cover a 2 year full power reactor test.
7 CFR 1710.102 - Borrower eligibility for different types of loans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... financing of distribution and subtransmission facilities of both distribution and power supply borrowers... distribution and subtransmission facilities of both distribution and power supply borrowers, including, under.... Both distribution and power supply borrowers are eligible for 100 percent loan guarantees under section...
7 CFR 1710.102 - Borrower eligibility for different types of loans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... financing of distribution and subtransmission facilities of both distribution and power supply borrowers... distribution and subtransmission facilities of both distribution and power supply borrowers, including, under.... Both distribution and power supply borrowers are eligible for 100 percent loan guarantees under section...
NASA Technical Reports Server (NTRS)
Darden, J. M.; Earhart, E. M.
2011-01-01
The limits of rotordynamic stability continue to be pushed by the high power densities and rotational speeds of modern rocket engine turbomachinery. Destabilizing forces increase dramatically with rotor speed. Rotordynamic stability is lost when these destabilizing forces overwhelm the stabilizing forces. The vibration from the unstable rotor grows until it is limited by some nonlinearity. For example, a rolling element bearing with a stiffness characteristic that increases with deflection may limit the vibration amplitude. The loads and deflections resulting from this limit cycle vibration (LCV) can lead to bearing and seal damage which promotes ever increasing levels of subsynchronous vibration. Engineers combat LCV by introducing rotordynamic elements that generate increased stabilizing forces and reduced destabilizing forces. For example, replacing a labyrinth seal with a damping seal results in substantial increases in the damping and stiffness rotordynamic coefficients. Adding a swirl brake to the damping seal greatly reduces the destabilizing cross-coupled forces generated by the damping seal for even further increases in the stabilizing capacity. Marshall?s Annular Seal Test (MAST) rig is designed to experimentally measure the stabilizing capacity of new annular seal designs. The rig has been moved to a new facility and outfitted with a new slave bearing to allow increased test durations and to enable the testing of fluid film bearings. The purpose of this paper is to describe the new facility and the new bearing arrangement. Several novel seal and bearing designs will also be discussed.
Commercial and Institutional Case Studies
Throughout the country, commercial and institutional (CI) building owners and facility managers are taking actions to reduce their water use, implementing many of the operations and maintenance, retrofit, and replacement projects.
Solid Waste Assurance Program Implementation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irons, L.G.
1995-06-19
On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixedmore » waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.« less
LPT. Aerial of low power test facility (TAN640 and 641) ...
LPT. Aerial of low power test facility (TAN-640 and -641) and shield test facility (TAN-645 and -646). Camera facing south. Low power reactor cells at left, then one-story control building; diagonal fence; shield test control building, then (high-bay) pool room. In foreground are electrical pad, water tanks and guard house. Photographer: Lowin. Date: February 24, 1965. INEEL negative no. 65-987 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
LPT. Aerial of low power test (TAN640 and 641) and ...
LPT. Aerial of low power test (TAN-640 and -641) and shield test (TAN-645 and -646) facilities. Camera facing north west. Low power test facility at right. Shield test facility at left. Flight engine test area in background at center left of view. Administrative and A&M areas at right. Photographer: Lowin. Date: February 24, 1965. INEEL negative no. 65-991 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Center for Space Power, Texas A and M University
NASA Astrophysics Data System (ADS)
Jones, Ken
Johnson Controls is a 106 year old company employing 42,000 people worldwide with $4.7 billion annual sales. Though we are new to the aerospace industry we are a world leader in automobile battery manufacturing, automotive seating, plastic bottling, and facilities environment controls. The battery division produces over 24,000,000 batteries annually under private label for the new car manufacturers and the replacement market. We are entering the aerospace market with the nickel hydrogen battery with the help of NASA's Center for Space Power at Texas A&M. Unlike traditional nickel hydrogen battery manufacturers, we are reaching beyond the space applications to the higher volume markets of aircraft starting and utility load leveling. Though space applications alone will not provide sufficient volume to support the economies of scale and opportunities for statistical process control, these additional terrestrial applications will. For example, nickel hydrogen batteries do not have the environmental problems of nickel cadmium or lead acid and may someday start your car or power your electric vehicle. However you envision the future, keep in mind that no manufacturer moves into a large volume market without fine tuning their process. The Center for Space Power at Texas A&M is providing indepth technical analysis of all of the materials and fabricated parts of our battery as well as thermal and mechanical design computer modeling. Several examples of what we are doing with nickel hydrogen chemistry to lead to these production efficiencies are presented.
Center for Space Power, Texas A and M University
NASA Technical Reports Server (NTRS)
Jones, Ken
1991-01-01
Johnson Controls is a 106 year old company employing 42,000 people worldwide with $4.7 billion annual sales. Though we are new to the aerospace industry we are a world leader in automobile battery manufacturing, automotive seating, plastic bottling, and facilities environment controls. The battery division produces over 24,000,000 batteries annually under private label for the new car manufacturers and the replacement market. We are entering the aerospace market with the nickel hydrogen battery with the help of NASA's Center for Space Power at Texas A&M. Unlike traditional nickel hydrogen battery manufacturers, we are reaching beyond the space applications to the higher volume markets of aircraft starting and utility load leveling. Though space applications alone will not provide sufficient volume to support the economies of scale and opportunities for statistical process control, these additional terrestrial applications will. For example, nickel hydrogen batteries do not have the environmental problems of nickel cadmium or lead acid and may someday start your car or power your electric vehicle. However you envision the future, keep in mind that no manufacturer moves into a large volume market without fine tuning their process. The Center for Space Power at Texas A&M is providing indepth technical analysis of all of the materials and fabricated parts of our battery as well as thermal and mechanical design computer modeling. Several examples of what we are doing with nickel hydrogen chemistry to lead to these production efficiencies are presented.
Impact of Distributed Energy Resources on the Reliability of a Critical Telecommunications Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, D.; Atcitty, C.; Zuffranieri, J.
2006-03-01
Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages, as documented by analyses of Federal Communications Commission (FCC) outage reports by the National Reliability Steering Committee (under auspices of the Alliance for Telecommunications Industry Solutions). There are two major issues that are having increasing impact on the sensitivity of the power distribution to telecommunication facilities: deregulation of the power industry, and changing weather patterns. A logical approach to improve the robustness of telecommunicationmore » facilities would be to increase the depth and breadth of technologies available to restore power in the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. But does the diversity in power sources actually increase the reliability of offered power to the office equipment, or does the complexity of installing and managing the extended power system induce more potential faults and higher failure rates? This report analyzes a system involving a telecommunications facility consisting of two switch-bays and a satellite reception system.« less
Space Power Facility at NASA’s Plum Brook Station
1969-02-21
Exterior view of the Space Power Facility at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station in Sandusky, Ohio. The $28.4-million facility, which began operations in 1969, is the largest high vacuum chamber ever built. The chamber is 100 feet in diameter and 120 feet high. It produces a vacuum deep enough to simulate the conditions at 300 miles altitude. The facility can sustain a high vacuum; simulate solar radiation via a 4-megawatt quartz heat lamp array, solar spectrum by a 400-kilowatt arc lamp, and cold environments. The Space Power Facility was originally designed to test nuclear power sources for spacecraft during long durations in a space atmosphere, but it was never used for that purpose. The facility’s first test in 1970 involved a 15 to 20-kilowatt Brayton Cycle Power System for space applications. Three different methods of simulating solar heat were employed during the Brayton tests. The facility was also used for jettison tests of the Centaur Standard Shroud. The shroud was designed for the new Titan-Centaur rocket that was scheduled to launch the Viking spacecraft to Mars. The new shroud was tested under conditions that simulated the time from launch to the separation of the stages. Test programs at the facility include high-energy experiments, shroud separation tests, Mars Lander system tests, deployable Solar Sail tests and International Space Station hardware tests.
Solar power satellite system definition study, volume 4, phase 2
NASA Technical Reports Server (NTRS)
1979-01-01
Results of an overall evaluation of the solar power satellite concept are reported. Specific topics covered include: solid state sandwich configuration; parametric development of reliability design; power distribution system for solid state solar power satellites; multibeam transmission; GEO base system configuration; suppression of the heavy lift launch vehicle trajectory; conceptual design of an offshore space center facility; solar power satellite development and operations scenario; and microwave power transmission technology, advancement, development, and facility requirements.
Replacing The Engine In Your Car While You Are Still Driving It [PowerPoint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bjorklund, Eric A.
The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for themore » operations staff. You will be surprised.« less
The Australian Replacement Research Reactor
NASA Astrophysics Data System (ADS)
Kennedy, Shane; Robinson, Robert
2004-03-01
The 20-MW Australian Replacement Research Reactor represents possibly the greatest single research infrastructure investment in Australia's history. Construction of the facility has commenced, following award of the construction contract in July 2000, and the construction licence in April 2002. The project includes a large state-of-the-art liquid deuterium cold-neutron source and supermirror guides feeding a large modern guide hall, in which most of the instruments are placed. Alongside the guide hall, there is good provision of laboratory, office and space for support activities. While the facility has "space" for up to 18 instruments, the project has funding for an initial set of 8 instruments, which will be ready when the reactor is fully operational in July 2006. Instrument performance will be competitive with the best research-reactor facilities anywhere, and our goal is to be in the top 3 such facilities worldwide. Staff to lead the design effort and man these instruments have been hired on the international market from leading overseas facilities, and from within Australia, and 7 out of 8 instruments have been specified and costed. At present the instrumentation project carries 10contingency. An extensive dialogue has taken place with the domestic user community and our international peers, via various means including a series of workshops over the last 2 years covering all 8 instruments, emerging areas of application like biology and the earth sciences, and computing infrastructure for the instruments.
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, recipients of a NASA Team Award for their parts in the successful construction of NASA's first large-scale solar power generation facility pose for a group portrait. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Building information models for astronomy projects
NASA Astrophysics Data System (ADS)
Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro
2012-09-01
A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.
Test facility for the evaluation of microwave transmission components
NASA Astrophysics Data System (ADS)
Fong, C. G.; Poole, B. R.
1985-10-01
A Low Power Test Facility (LPTF) was developed to evaluate the performance of Electron Cyclotron Resonance Heating (ECRH) microwave transmission components for the Mirror Fusion Test Facility (MFTF-B). The facility generates 26 to 60 GHz in modes of TE01, TE02, or TE03 launched at power levels of 1/2 milliwatt. The propagation of the RF as it radiates from either transmitting or secondary reflecting microwave transmission components is recorded by a discriminating crystal detector mechanically manipulated at constant radius in spherical coordinates. The facility is used to test, calibrate, and verify the design of overmoded, circular waveguide components, quasi-optical reflecting elements before high power use. The test facility consists of microwave sources and metering components, such as VSWR, power and frequency meters, a rectangular TE10 to circular TE01 mode transducer, mode filter, circular TE01 to 2.5 in. diameter overmoded waveguide with mode converters for combination of TE01 to TE03 modes. This assembly then connects to a circular waveguide launcher or the waveguide component under test.
Hardware in the Loop at Megawatt-Scale Power | Energy Systems Integration
Facility | NREL Hardware in the Loop at Megawatt-Scale Power Hardware in the Loop at Megawatt -Scale Power Hardware-in-the-loop simulation is not new, but the Energy System Integration Facility's -in-the-loop co-simulation. For more information, read the power hardware-in-the-loop factsheet. Text
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates, Eric Silagy, Florida Power & Light Company vice president and chief development officer, for his part in the construction of NASA's first large-scale solar power generation facility as Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, for his part in the construction of NASA's first large-scale solar power generation facility as Eric Silagy, Florida Power & Light Company vice president and chief development officer, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Synthesis of graphene nanomaterials and their application in electrochemical energy storage
NASA Astrophysics Data System (ADS)
Xiong, Guoping
The need to store and use energy on diverse scales in a modern technological society necessitates the design of large and small energy systems, among which electrical energy storage systems such as batteries and capacitors have attracted much interest in the past several decades. Supercapacitors, also known as ultracapacitors, or electrochemical capacitors, with fast power delivery and long cycle life are complementing or even replacing batteries in many applications. The rapid development of miniaturized electronic devices has led to a growing need for rechargeable micro-power sources with high performance. Among different sources, electrochemical micro-capacitors or micro-supercapacitors provide higher power density than their counterparts and are gaining increased interest from the research and engineering communities. Rechargeable Li ion batteries with high energy and power density, long cycling life, high charge-discharge rate (1C - 3C) and safe operation are in high demand as power sources and power backup for hybrid electric vehicles and other applications. In the present work, graphene-based graphene materials have been designed and synthesized for electrochemical energy storage applications, e.g., conventional supercapacitors (macro-supercapacitors), microsupercapacitors and lithium ion batteries. Factors influencing the formation and structure of graphitic petals grown by microwave plasma-enhanced chemical vapor deposition on oxidized silicon substrates were investigated through process variation and materials analysis. Insights gained into the growth mechanism of these graphitic petals suggest a simple scribing method can be used to control both the location and formation of petals on flat Si substrates. Transitional metal oxides and conducting polymers have been coated on the graphitic petal-based electrodes by facile chemical methods for multifunctional energy storage applications. Detailed electrochemical characterization (e.g., cyclic voltammetry and constant galvanostatic charge/discharge) has been carried out to evaluate the performance of electrodes.
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false General requirements...
18 CFR 367.1850 - Account 185, Temporary facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 185, Temporary facilities. 367.1850 Section 367.1850 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
340 Facility secondary containment and leak detection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bendixsen, R.B.
1995-01-31
This document presents a preliminary safety evaluation for the 340 Facility Secondary Containment and Leak Containment system, Project W-302. Project W-302 will construct Building 340-C which has been designed to replace the current 340 Building and vault tank system for collection of liquid wastes from the Pacific Northwest Laboratory buildings in the 300 Area. This new nuclear facility is Hazard Category 3. The vault tank and related monitoring and control equipment are Safety Class 2 with the remainder of the structure, systems and components as Safety Class 3 or 4.
Total Hip Joint Replacement Biotelemetry System
NASA Technical Reports Server (NTRS)
Boreham, J. F.; Postal, R. B.; Luntz, R. A.
1981-01-01
The development of a biotelemetry system that is hermetically sealed within a total hip replacement implant is reported. The telemetry system transmits six channels of stress data to reconstruct the major forces acting on the neck of the prosthesis and uses an induction power coupling technique to eliminate the need for internal batteries. The activities associated with the telemetry microminiaturization, data recovery console, hardware fabrications, power induction systems, electrical and mechanical testing and hermetic sealing test results are discussed.
1992 five year battery forecast
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amistadi, D.
1992-12-01
Five-year trends for automotive and industrial batteries are projected. Topic covered include: SLI shipments; lead consumption; automotive batteries (5-year annual growth rates); industrial batteries (standby power and motive power); estimated average battery life by area/country for 1989; US motor vehicle registrations; replacement battery shipments; potential lead consumption in electric vehicles; BCI recycling rates for lead-acid batteries; US average car/light truck battery life; channels of distribution; replacement battery inventory end July; 2nd US battery shipment forecast.
Brayton Cycle Power System in the Space Power Facility
1969-07-21
Set up of a Brayton Cycle Power System test in the Space Power Facility’s massive vacuum chamber at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station in Sandusky, Ohio. The $28.4-million facility, which began operations in 1969, is the largest high vacuum chamber ever built. The chamber is 100 feet in diameter and 120 feet high. It can produce a vacuum deep enough to simulate the conditions at 300 miles altitude. The Space Power Facility was originally designed to test nuclear-power sources for spacecraft, but it was never used for that purpose. The Space Power Facility was first used to test a 15 to 20-kilowatt Brayton Cycle Power System for space applications. Three different methods of simulating solar heat were employed during the tests. Lewis researchers studied the Brayton power system extensively in the 1960s and 1970s. The Brayton engine converted solar thermal energy into electrical power. The system operated on a closed-loop Brayton thermodynamic cycle with a helium-xenon gas mixture as its working fluid. A space radiator was designed to serve as the system’s waste heat rejecter. The radiator was later installed in the vacuum chamber and tested in a simulated space environment to determine its effect on the power conversion system. The Brayton system was subjected to simulated orbits with 62 minutes of sun and 34 minutes of shade.
Whether you are looking to reduce water use in a new facility or replace old, inefficient toilets in commercial restrooms, a WaterSense labeled flushometer-valve toilet is a high-performance, water-efficient option worth considering.
Rooney, R C; Foote, L; Krogman, N; Pattison, J K; Wilson, M J; Bayley, S E
2015-04-15
Urban expansion replaces wetlands of natural origin with artificial stormwater management facilities. The literature suggests that efforts to mimic natural wetlands in the design of stormwater facilities can expand the provision of ecosystem services. Policy developments seek to capitalize on these improvements, encouraging developers to build stormwater wetlands in place of stormwater ponds; however, few have compared the biophysical values and social perceptions of these created wetlands to those of the natural wetlands they are replacing. We compared four types of wetlands: natural references sites, natural wetlands impacted by agriculture, created stormwater wetlands, and created stormwater ponds. We anticipated that they would exhibit a gradient in biodiversity, ecological integrity, chemical and hydrologic stress. We further anticipated that perceived values would mirror measured biophysical values. We found higher biophysical values associated with wetlands of natural origin (both reference and agriculturally impacted). The biophysical values of stormwater wetlands and stormwater ponds were lower and indistinguishable from one another. The perceived wetland values assessed by the public differed from the observed biophysical values. This has important policy implications, as the public are not likely to perceive the loss of values associated with the replacement of natural wetlands with created stormwater management facilities. We conclude that 1) agriculturally impacted wetlands provide biophysical values equivalent to those of natural wetlands, meaning that land use alone is not a great predictor of wetland value; 2) stormwater wetlands are not a substantive improvement over stormwater ponds, relative to wetlands of natural origin; 3) stormwater wetlands are poor mimics of natural wetlands, likely due to fundamental distinctions in terms of basin morphology, temporal variation in hydrology, ground water connectivity, and landscape position; 4) these drivers are relatively fixed, thus, once constructed, it may not be possible to modify them to improve provision of biophysical values; 5) these fixed drivers are not well perceived by the public and thus public perception may not capture the true value of natural wetlands, including those impacted by agriculture. Copyright © 2014 Elsevier Ltd. All rights reserved.
Intensive Hemodialysis and Mortality Risk in Australian and New Zealand Populations.
Marshall, Mark R; Polkinghorne, Kevan R; Kerr, Peter G; Hawley, Carmel M; Agar, John W M; McDonald, Stephen P
2016-04-01
Intensive hemodialysis (HD) is characterized by increased frequency and/or session length compared to conventional HD. Previous analyses from Australia and New Zealand did not suggest benefit with intensive HD, although recent research suggests that relationships have changed. We present updated analyses. Observational cohort study using marginal structural modeling to adjust for changes in renal replacement modality and time-varying medical comorbid conditions. Adults initiating renal replacement therapy since March 31, 1996, followed up through December 31, 2012; this analysis included 40,842 patients over 2,187,689 patient-months. Time-varying renal replacement modality: conventional facility HD (≤3 times per week, ≤6 hours per session), quasi-intensive facility HD (between conventional and intensive), intensive facility HD (≥5 times per week, any hours per session), conventional home HD, quasi-intensive home HD, intensive home HD, peritoneal dialysis, deceased donor kidney transplantation, and living donor kidney transplantation. Patient mortality, with a 3-month lag in primary analyses and 6- and 12-month lags in sensitivity analyses. Conventional facility HD was the reference group. Conventional home HD had a similar mortality risk. For quasi-intensive home HD, mortality risk was lower (HR, 0.56; 95% CI, 0.44-0.73). For intensive home HD, mortality risk was nonsignificantly lower in primary analyses and significantly lower using a 6-month lag (HR, 0.41; 95% CI, 0.20-0.85), but not using a 12-month lag. For quasi-intensive facility HD, mortality risk was nonsignificantly lower in primary analyses, although significantly lower using 6- (HR, 0.41; 95% CI, 0.20-0.85) and 12-month lags (HR, 0.59; 95% CI, 0.44-0.80). Mortality risk was similar between intensive and conventional facility HD. For peritoneal dialysis, mortality risk was greater than for conventional facility HD (HR, 1.07; 95% CI, 1.03-1.12). Kidney transplantation had the lowest mortality risk. Potential residual confounding from limited collection of comorbid condition, socioeconomic, and medication data. There is an emerging HD dose-effect in Australia and New Zealand, with lower mortality risks associated with some of the more intensive HD regimens in these countries. Copyright © 2016 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.
Feasibility study and verified design concept for new improved hot gas facility
NASA Technical Reports Server (NTRS)
1986-01-01
The MSFC Hot Gas Facility (HGF) was fabricated in 1975 as a temporary facility to provide immediate turnaround testing to support the SRB and ET TPS development. This facility proved to be very useful and was used to make more than 1300 runs, far more than ever intended in the original design. Therefore, it was in need of constant repair and needed to be replaced with a new improved design to support the continuing SRB/ET TPS product improvement and/or removal efforts. MSFC contracted with Lockheed-Huntsville to work on this improved design through contract NAS8-36304 Feasibility Study and Verified Design Concept for the New Improved Hot Gas Facility. The results of Lockheed-Huntsville's efforts under this contract are summarized.
STS-82 Discovery payloads being integrated in VPF
1997-01-30
KENNEDY SPACE CENTER, FLORIDA STS-82 PREPARATIONS VIEW --- Payload processing workers in the Kennedy Space Center (KSC) Vertical Processing Facility (VPF) prepare to integrate the Space Telescope Imaging Spectrograph (STIS), suspended at center, into the Orbiter Replacement Unit (ORU) Carrier and Scientific Instrument Protective Enclosure (SIPE). STIS will replace the Goddard High Resolution Spectrograph (GHRS) on the Hubble Space Telescope (HST). Four of the seven STS-82 crew members will perform a series of spacewalks to replace two scientific instruments with two new instruments, including STIS, and perform other tasks during the second HST servicing mission. HST was deployed nearly seven years ago and was initially serviced in 1993.
System reliability analysis through corona testing
NASA Technical Reports Server (NTRS)
Lalli, V. R.; Mueller, L. A.; Koutnik, E. A.
1975-01-01
A corona vacuum test facility for nondestructive testing of power system components was built in the Reliability and Quality Engineering Test Laboratories at the NASA Lewis Research Center. The facility was developed to simulate operating temperature and vacuum while monitoring corona discharges with residual gases. The facility is being used to test various high-voltage power system components.
A developmental perspective on high power laser facility technology for ICF
NASA Astrophysics Data System (ADS)
Zhu, Jianqiang; Sun, Mingying; Liu, Chong; Guo, Yajing; Yang, Lin; Yang, Pengqian; Zhang, Yanli; Wang, Bingyan; Liu, Cheng; Li, Yangshuai; Ren, Zhiyuan; Liu, Dean; Liu, Zhigang; Jiao, Zhaoyang; Ren, Lei; Zhang, Guowen; Fan, Quantang; Feng, Tao; Lin, Zunqi
2018-02-01
The latest progress on high power laser facilities in NLHPLP was reported. Based on a high power laser prototype, damage behavior of 3ω optics was experimentally tested, and the key influencing factors contributed to laser-induced damage in optics were deeply analyzed. The latest experimental results of advanced precision measurement for optical quality applied in the high power laser facility were introduced. At last, based on the accumulated works of 3ω elements damage behavior status in our laboratory, beam expanding scheme was presented to increase the total maximum output 3ω energy properly and decrease the laser induced damage risking of ω optics simultaneously.
Tehachapi Wind Energy Storage Project - Technology Performance Report #3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pinsky, Naum; O'Neill, Lori
The TSP is located at SCE’s Monolith Substation in Tehachapi, California. The 8 MW, 4 hours (32 MWh) BESS is housed in a 6,300 square foot facility and 2 x 4 MW/4.5 MVA smart inverters are on a concrete pad adjacent to the BESS facility. The project will evaluate the capabilities of the BESS to improve grid performance and assist in the integration of large-scale intermittent generation, e.g., wind. Project performance was measured by 13 specific operational uses: providing voltage support and grid stabilization, decreasing transmission losses, diminishing congestion, increasing system reliability, deferring transmission investment, optimizing renewable-related transmission, providing systemmore » capacity and resources adequacy, integrating renewable energy (smoothing), shifting wind generation output, frequency regulation, spin/non-spin replacement reserves, ramp management, and energy price arbitrage. Most of the operations either shift other generation resources to meet peak load and other electricity system needs with stored electricity, or resolve grid stability and capacity concerns that result from the interconnection of intermittent generation. SCE also demonstrated the ability of lithium ion battery storage to provide nearly instantaneous maximum capacity for supply-side ramp rate control to minimize the need for fossil fuel-powered back-up generation. The project began in October, 2010 and will continue through December, 2016.« less
Huttinger, Alexandra; Dreibelbis, Robert; Roha, Kristin; Ngabo, Fidel; Kayigamba, Felix; Mfura, Leodomir; Moe, Christine
2015-01-01
There is a critical need for safe water in healthcare facilities (HCF) in low-income countries. HCF rely on water supplies that may require additional on-site treatment, and need sustainable technologies that can deliver sufficient quantities of water. Water treatment systems (WTS) that utilize ultrafiltration membranes for water treatment can be a useful technology in low-income countries, but studies have not systematically examined the feasibility of this technology in low-income settings. We monitored 22 months of operation of 10 WTS, including pre-filtration, membrane ultrafiltration, and chlorine residual disinfection that were donated to and operated by rural HCF in Rwanda. The systems were fully operational for 74% of the observation period. The most frequent reasons for interruption were water shortage (8%) and failure of the chlorination mechanism (7%). When systems were operational, 98% of water samples collected from the HCF taps met World Health Organization (WHO) guidelines for microbiological water quality. Water quality deteriorated during treatment interruptions and when water was stored in containers. Sustained performance of the systems depended primarily on organizational factors: the ability of the HCF technician to perform routine servicing and repairs, and environmental factors: water and power availability and procurement of materials, including chlorine and replacement parts in Rwanda. PMID:26516883
Huttinger, Alexandra; Dreibelbis, Robert; Roha, Kristin; Ngabo, Fidel; Kayigamba, Felix; Mfura, Leodomir; Moe, Christine
2015-10-27
There is a critical need for safe water in healthcare facilities (HCF) in low-income countries. HCF rely on water supplies that may require additional on-site treatment, and need sustainable technologies that can deliver sufficient quantities of water. Water treatment systems (WTS) that utilize ultrafiltration membranes for water treatment can be a useful technology in low-income countries, but studies have not systematically examined the feasibility of this technology in low-income settings. We monitored 22 months of operation of 10 WTS, including pre-filtration, membrane ultrafiltration, and chlorine residual disinfection that were donated to and operated by rural HCF in Rwanda. The systems were fully operational for 74% of the observation period. The most frequent reasons for interruption were water shortage (8%) and failure of the chlorination mechanism (7%). When systems were operational, 98% of water samples collected from the HCF taps met World Health Organization (WHO) guidelines for microbiological water quality. Water quality deteriorated during treatment interruptions and when water was stored in containers. Sustained performance of the systems depended primarily on organizational factors: the ability of the HCF technician to perform routine servicing and repairs, and environmental factors: water and power availability and procurement of materials, including chlorine and replacement parts in Rwanda.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Rock, AR; Application for Subzone; Mitsubishi Power Systems Americas, Inc. (Wind Turbine Nacelles and... subzone status for the wind turbine nacelle and generating set manufacturing facility of Mitsubishi Power.... The facility, currently under construction, will be used to manufacture and distribute wind turbine...
NASA Astrophysics Data System (ADS)
Khroustalev, V. A.; Simonyan, A. A.
2017-11-01
There was carried out an analysis of technical characteristics of boiler houses in a number of Russian NPPs. We justified the possibility of their usage for autonomous generation of electrical energy and improvement of maneuvering properties of power complexes as a single object of regulation, as well as the possibility of increasing the total generation capacity of NPP power units during peak hours. Then the selection of the main equipment of house boiler for its autonomous work was done. There were composed basic thermal diagrams of the power complex on the basis of NPP start-up boiler (SUB) and the satellite turbine. The article also considers some options of reconstruction of SUB into the heat-recovery boiler. The developed power complexes are designed to be used on the basis of the two-loop NPP with pressurized power reactors (PWR). They can be applied with serial and projected domestic NPP units with the aim of getting more power, improving the plant capacity factor (PCF), as well as with the aim of NPP participation in the regulation of the load curve above the nominal value with partial replacement of new construction. The power complexes can be a relevant solution in the light of the energy strategy of the Russian Federation, which is aimed at, firstly, further improvement of efficiency and safety at the NPP, and, secondly, solving the problem of adequate maneuverability and ensuring the adjustment range limits in power systems with high share of nuclear power plants. Implementation of new hybrid thermal diagrams allows simultaneous increase in the safety of NPP, and usage of nuclear power plants emergency frequency control in power systems by fast load drop and rise by -4÷+2 % of the nominal value. Due to the usage of different fuels in power complexes, uranium loading in the core of reactor facilities and gas in SUB, there was proposed and formalized the criterion of “thermoeconomic index”. This criterion represents the ratio of the gross receipt from the sale of electricity to the total cost of fuel of all kinds, spent on ensuring power efficiency.
300 Area Building Retention Evaluation Mitigation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. J. McBride
2007-07-03
Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.
Skilled nursing facilities after joint replacement
... able to: Safely get around using a cane, walker, or crutches. Get in and out of a ... climb steps, keep your balance, and use a walker, cane, or crutches. Occupational therapists will teach you ...
Utilities on the primary road system.
DOT National Transportation Integrated Search
1992-05-01
This chapter covers initial placement, adjustment, improvement, relocation, replacement and maintenance of utility facilities in, on, above, or below the right-of-way of primary highways, including attachments to primary highway structures. It embodi...
Delirium Research: Where Am I?
... facility, he experienced shortness of breath and acute lower-extremity edema that resulted in a series of hospital ... had a serious fall and sustained multiple hip fractures that required emergency hip replacement surgery to repair. ...
Fuel Cells Provide Reliable Power to U.S. Postal Service Facility in Anchorage, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, Steven
2003-01-01
Working together, the U.S. Postal Service (USPS) and Chugach Electric Association, partnering with the Department of Defense (DOD), Department of Energy (DOE), US Army Corps of Engineers Construction Engineering Research Laboratories (USA CERL), Electric Power Research Institute (EPRI), and National Rural Electric Cooperative Association (NRECA), developed and installed one of the largest fuel cell installations in the world. The one-megawatt fuel cell combined heat and power plant sits behind the Anchorage U.S. Postal Service Mail Processing and Distribution Facility. Chugach Electric owns, operates, and maintains the fuel cell power plant, which provides clean, reliable power to the USPS facility. Inmore » addition, heat recovered from the fuel cells, in the form of hot water, is used to heat the USPS Mail Processing and Distribution Facility. By taking a leadership role, the USPS will save over $800,000 in electricity and natural gas costs over the 5 1/2-year contract term with Chugach Electric.« less
2013-08-01
were Acute Kidney Injury Network (AKIN) 3 and all developed critical hyperkalemia (mean [SD], peak K+ 6.4 [0.4]). The peak plasma creatinine ranged...related acid-base disorders, severe hyperkalemia , and metabolic disorders became apparent. Based on the mounting pressure and internal performance im...with severe hyperkalemia was the most common indication for renal replacement. Validation for critical care evacuation to the Role IV facility mandated a
Colville Tribal Fish Hatchery, 2000-2001 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arteburn, John; Christensen, David
Federal hydropower projects as well as private power utility systems have had a devastating impact upon anadromous fish resources that once flourished in the Columbia River and it's tributaries. Several areas were completely blocked to anadromous fish by dams, causing the native people who's number one food resource was salmon to rely entirely upon resident fish to replace lost fisheries resources. The Colville Tribal Fish Hatchery is an artificial production program to partially mitigate for anadromous fish losses in the ''Blocked Area'' above Chief Joseph and Grand Coulee Dams pursuant to Resident Fish Substitution Policy of the Northwest Power Planningmore » Councils Fish and Wildlife Program. The hatchery was accepted into the Council's Fish and Wildlife Program in 1984 as a resident fish substitution measure and the hatchery was completed in 1990. The minimum production quota for this facility is 22,679 kg (50,000 lbs.) of trout. To achieve this quota the Colville Tribal Hatchery was scheduled to produce 174,000 fingerling rainbow trout (5 grams/fish), 330,000 sub-yearling rainbow trout (15 grams/fish), 80,000 legal size rainbow trout (90 grams/fish), 196,000 fingerling brook trout (5 grams/fish), 330,000 subyearling brook trout (15 grams/fish) and 60,000 lahontan cutthroat trout (15 grams/fish) in 2001. All fish produced are released into reservation waters, including boundary waters in an effort to provide a successful subsistence /recreational fishery for Colville Tribal members as well as a successful non-member sport fishery. The majority of the fish distributed from the facility are intended to provide a ''carry-over'' fishery. Fish produced at the facility are intended to be capable of contributing to the natural production component of the reservation fish populations. Contribution to the natural production component will be achieved by producing and releasing fish of sufficient quality and quantity for fish to survive to spawning maturity, to spawn naturally in existing and future available habitat (i.e. natural supplementation), while meeting other program objectives. In addition to the hatchery specific goals detailed above, hatchery personnel will actively participate in the Northwest Power Planning Council program, participate in the Columbia Basin Fish and Wildlife Foundation, Resident Fish Committee, and other associated committees and Ad Hoc groups that may be formed to address resident fish issues in the blocked area above Chief Joseph and Grand Coulee Dams.« less
Development of Live-working Robot for Power Transmission Lines
NASA Astrophysics Data System (ADS)
Yan, Yu; Liu, Xiaqing; Ren, Chengxian; Li, Jinliang; Li, Hui
2017-07-01
Dream-I, the first reconfigurable live-working robot for power transmission lines successfully developed in China, has the functions of autonomous walking on lines and accurately positioning. This paper firstly described operation task and object of the robot; then designed a general platform, an insulator replacement end and a drainage plate bolt fastening end of the robot, presented a control system of the robot, and performed simulation analysis on operation plan of the robot; and finally completed electrical field withstand voltage tests in a high voltage hall as well as online test and trial on actual lines. Experimental results show that by replacing ends of manipulators, the robot can fulfill operation tasks of live replacement of suspension insulators and live drainage plate bolt fastening.
SSE Transition to POWER is Now Complete
Atmospheric Science Data Center
2018-06-21
... A new POWER home page with enhanced responsive GIS-enabled web data services and mapping capabilities replaced the SSE site on June 13, 2018. This current set of SSE web applications and website is no longer accessible. The new POWER includes ...
Concentrating Solar Power Projects - Martin Next Generation Solar Energy
solar plant of any kind outside of California. The facility is the first hybrid facility in the world to connect a solar facility to an existing combined-cycle power plant, providing 75 megawatts of solar up to about 200,000 mirrors over about 500 acres at the existing FPL Martin Plant site. Status Date
System reliability analysis through corona testing
NASA Technical Reports Server (NTRS)
Lalli, V. R.; Mueller, L. A.; Koutnik, E. A.
1975-01-01
In the Reliability and Quality Engineering Test Laboratory at the NASA Lewis Research Center a nondestructive, corona-vacuum test facility for testing power system components was developed using commercially available hardware. The test facility was developed to simulate operating temperature and vacuum while monitoring corona discharges with residual gases. This facility is being used to test various high voltage power system components.
Space Power Facility Reverberation Chamber Calibration Report
NASA Technical Reports Server (NTRS)
Lewis, Catherine C.; Dolesh, Robert J.; Garrett, Michael J.
2014-01-01
This document describes the process and results of calibrating the Space Environmental Test EMI Test facility at NASA Plum Brook Space Power Facility according to the specifications of IEC61000-4-21 for susceptibility testing from 100 MHz to 40 GHz. The chamber passed the field uniformity test, in both the empty and loaded conditions, making it the world's largest Reverberation Chamber.
Evaluation of Facility Management by Multivariate Statistics - Factor Analysis
NASA Astrophysics Data System (ADS)
Singovszki, Miloš; Vranayová, Zuzana
2013-06-01
Facility management is evolving, there is no exact than other sciences, although its development is fast forward. The knowledge and practical skills in facility management is not replaced, on the contrary, they complement each other. The existing low utilization of science in the field of facility management is mainly caused by the management of support activities are many variables and prevailing immediate reaction to the extraordinary situation arising from motives of those who have substantial experience and years of proven experience. Facility management is looking for a system that uses organized knowledge and will form the basis, which grows from a wide range of disciplines. Significant influence on its formation as a scientific discipline is the "structure, which follows strategy". The paper deals evaluate technology building as part of an facility management by multivariate statistic - factor analysis.
Research study on multi-KW-DC distribution system
NASA Technical Reports Server (NTRS)
Berkery, E. A.; Krausz, A.
1975-01-01
A detailed definition of the HVDC test facility and the equipment required to implement the test program are provided. The basic elements of the test facility are illustrated, and consist of: the power source, conventional and digital supervision and control equipment, power distribution harness and simulated loads. The regulated dc power supplies provide steady-state power up to 36 KW at 120 VDC. Power for simulated line faults will be obtained from two banks of 90 ampere-hour lead-acid batteries. The relative merits of conventional and multiplexed power control will be demonstrated by the Supervision and Monitor Unit (SMU) and the Automatically Controlled Electrical Systems (ACES) hardware. The distribution harness is supported by a metal duct which is bonded to all component structures and functions as the system ground plane. The load banks contain passive resistance and reactance loads, solid state power controllers and active pulse width modulated loads. The HVDC test facility is designed to simulate a power distribution system for large aerospace vehicles.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, D. G.; Arent, D. J.; Johnson, L.
2006-06-01
This paper documents a probabilistic risk assessment of existing and alternative power supply systems at a large telecommunications office. The analysis characterizes the increase in the reliability of power supply through the use of two alternative power configurations. Failures in the power systems supporting major telecommunications service nodes are a main contributor to significant telecommunications outages. A logical approach to improving the robustness of telecommunication facilities is to increase the depth and breadth of technologies available to restore power during power outages. Distributed energy resources such as fuel cells and gas turbines could provide additional on-site electric power sources tomore » provide backup power, if batteries and diesel generators fail. The analysis is based on a hierarchical Bayesian approach and focuses on the failure probability associated with each of three possible facility configurations, along with assessment of the uncertainty or confidence level in the probability of failure. A risk-based characterization of final best configuration is presented.« less
Design and optimization of geothermal power generation, heating, and cooling
NASA Astrophysics Data System (ADS)
Kanoglu, Mehmet
Most of the world's geothermal power plants have been built in 1970s and 1980s following 1973 oil crisis. Urgency to generate electricity from alternative energy sources and the fact that geothermal energy was essentially free adversely affected careful designs of plants which would maximize their performance for a given geothermal resource. There are, however, tremendous potentials to improve performance of many existing geothermal power plants by retrofitting, optimizing the operating conditions, re-selecting the most appropriate binary fluid in binary plants, and considering cogeneration such as a district heating and/or cooling system or a system to preheat water entering boilers in industrial facilities. In this dissertation, some representative geothermal resources and existing geothermal power plants in Nevada are investigated to show these potentials. Economic analysis of a typical geothermal resource shows that geothermal heating and cooling may generate up to 3 times as much revenue as power generation alone. A district heating/cooling system is designed for its incorporation into an existing 27 MW air-cooled binary geothermal power plant. The system as designed has the capability to meet the entire heating needs of an industrial park as well as 40% of its cooling needs, generating potential revenues of $14,040,000 per year. A study of the power plant shows that evaporative cooling can increase the power output by up to 29% in summer by decreasing the condenser temperature. The power output of the plant can be increased by 2.8 percent by optimizing the maximum pressure in the cycle. Also, replacing the existing working fluid isobutane by butane, R-114, isopentane, and pentane can increase the power output by up to 2.5 percent. Investigation of some well-known geothermal power generation technologies as alternatives to an existing 12.8 MW single-flash geothermal power plant shows that double-flash, binary, and combined flash/binary designs can increase the net power output by up to 31 percent, 35 percent, and 54 percent, respectively, at optimum operating conditions. An economic comparison of these designs appears to favor the combined flash/binary design, followed by the double-flash design.
NASA Astrophysics Data System (ADS)
Petrakopoulou, F.; Sanz, J.
2014-12-01
Steam electrolysis is a promising process of large-scale centralized hydrogen production, while it is also considered an excellent option for the efficient use of renewable solar and geothermal energy resources. This work studies the operation of an intermediate temperature steam electrolyzer (ITSE) and its incorporation into hybrid power plants that include biomass combustion and photovoltaic panels (PV). The plants generate both electricity and hydrogen. The reference -biomass- power plant and four variations of a hybrid biomass-PV incorporating the reference biomass plant and the ITSE are simulated and evaluated using exergetic analysis. The variations of the hybrid power plants are associated with (1) the air recirculation from the electrolyzer to the biomass power plant, (2) the elimination of the sweep gas of the electrolyzer, (3) the replacement of two electric heaters with gas/gas heat exchangers, and (4) the replacement two heat exchangers of the reference electrolyzer unit with one heat exchanger that uses steam from the biomass power plant. In all cases, 60% of the electricity required in the electrolyzer is covered by the biomass plant and 40% by the photovoltaic panels. When comparing the hybrid plants with the reference biomass power plant that has identical operation and structure as that incorporated in the hybrid plants, we observe an efficiency decrease that varies depending on the scenario. The efficiency decrease stems mainly from the low effectiveness of the photovoltaic panels (14.4%). When comparing the hybrid scenarios, we see that the elimination of the sweep gas decreases the power consumption due to the elimination of the compressor used to cover the pressure losses of the filter, the heat exchangers and the electrolyzer. Nevertheless, if the sweep gas is used to preheat the air entering the boiler of the biomass power plant, the efficiency of the plant increases. When replacing the electric heaters with gas-gas heat exchangers, the efficiency of the plant increases, although the higher pressure losses of the flue-gas path increase the requirements of the air compressor. Finally, replacing the two heat exchangers of the electrolyzer unit with one that uses extracted steam from the biomass power plant can lead to an overall decrease in the operating and investment costs of the plant.
2009-11-19
CAPE CANAVERAL, Fla. – A ceremonial "flipping of the switch" officially begins operation of NASA's first large-scale solar power generation facility at NASA's Kennedy Space Center in Florida. Flipping the four-foot-tall light switch in unison are, from left, Bob Cabana, Kennedy center director; Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation; and Eric Silagy, Florida Power & Light Company vice president and chief development officer. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
NASA Technical Reports Server (NTRS)
Rogers, J. P.; Cureton, K. L.; Olsen, J. R.
1994-01-01
Future aerospace vehicles will require use of the Electrical Actuator systems for flight control elements. This report presents a proposed ELA Test Facility for dynamic evaluation of high power linear Electrical Actuators with primary emphasis on Thrust Vector Control actuators. Details of the mechanical design, power and control systems, and data acquisition capability of the test facility are presented. A test procedure for evaluating the performance of the ELA Test Facility is also included.
Characterization of 14C in Swedish light water reactors.
Magnusson, Asa; Aronsson, Per-Olof; Lundgren, Klas; Stenström, Kristina
2008-08-01
This paper presents the results of a 4-y investigation of 14C in different waste streams of both boiling water reactors (BWRs) and pressurized water reactors (PWRs). Due to the potential impact of 14C on human health, minimizing waste and releases from the nuclear power industry is of considerable interest. The experimental data and conclusions may be implemented to select appropriate waste management strategies and practices at reactor units and disposal facilities. Organic and inorganic 14C in spent ion exchange resins, process water systems, ejector off-gas and replaced steam generator tubes were analyzed using a recently developed extraction method. Separate analysis of the chemical species is of importance in order to model and predict the fate of 14C within process systems as well as in dose calculations for disposal facilities. By combining the results of this investigation with newly calculated production rates, mass balance assessments were made of the 14C originating from production in the coolant. Of the 14C formed in the coolant of BWRs, 0.6-0.8% was found to be accumulated in the ion exchange resins (core-specific production rate in the coolant of a 2,500 MWth BWR calculated to be 580 GBq GW(e)(-1) y(-1)). The corresponding value for PWRs was 6-10% (production rate in a 2,775 MWth PWR calculated to be 350 GBq GW(e)(-1) y(-1)). The 14C released with liquid discharges was found to be insignificant, constituting less than 0.5% of the production in the coolant. The stack releases, routinely measured at the power plants, were found to correspond to 60-155% of the calculated coolant production, with large variations between the BWR units.
Polypyrrole RVC biofuel cells for powering medical implants.
Roxby, Daniel N; Ting, S R Simon; Nguyen, Hung T
2017-07-01
Batteries for implanted medical devices such as pacemakers typically require surgical replacement every 5 to 10 years causing stress to the patient and their families. A Biofuel cell uses two electrodes with enzymes embedded to convert sugar into electricity. To evaluate the power producing capabilities of biofuel cells to replace battery technology, polypyrrole electrodes were fabricated by compression with Glucose oxidase and Laccase. Vitreous carbon was added to increase the conductivity, whilst glutaraldehyde acted as a crosslinking molecule. A maximum open circuit potential of 558.7 mV, short circuit current of 1.09 mA and maximum power of 0.127 mW was obtained from the fuel cells. This was able to turn on a medical thermometer through a TI BQ25504 energy harvesting circuit, hence showing the powering potential for biomedical devices.
Roxby, Daniel N; Nham Tran; Pak-Lam Yu; Nguyen, Hung T
2016-08-01
Implanted biomedical devices typically last a number of years before their batteries are depleted and a surgery is required to replace them. A Microbial Fuel Cell (MFC) is a device which by using bacteria, directly breaks down sugars to generate electricity. Conceptually there is potential to continually power implanted medical devices for the lifetime of a patient. To investigate the practical potential of this technology, H-Cell Dual Chamber MFCs were evaluated with two different growth solutions and measurements recorded for maximum power output both of individual MFCs and connected MFCs. Using Luria-Bertani media and connecting MFCs in a hybrid series and parallel arrangement with larger membrane sizes showed the highest power output and the greatest potential for replacing implanted batteries.
Estimation of marginal costs at existing waste treatment facilities.
Martinez-Sanchez, Veronica; Hulgaard, Tore; Hindsgaul, Claus; Riber, Christian; Kamuk, Bettina; Astrup, Thomas F
2016-04-01
This investigation aims at providing an improved basis for assessing economic consequences of alternative Solid Waste Management (SWM) strategies for existing waste facilities. A bottom-up methodology was developed to determine marginal costs in existing facilities due to changes in the SWM system, based on the determination of average costs in such waste facilities as function of key facility and waste compositional parameters. The applicability of the method was demonstrated through a case study including two existing Waste-to-Energy (WtE) facilities, one with co-generation of heat and power (CHP) and another with only power generation (Power), affected by diversion strategies of five waste fractions (fibres, plastic, metals, organics and glass), named "target fractions". The study assumed three possible responses to waste diversion in the WtE facilities: (i) biomass was added to maintain a constant thermal load, (ii) Refused-Derived-Fuel (RDF) was included to maintain a constant thermal load, or (iii) no reaction occurred resulting in a reduced waste throughput without full utilization of the facility capacity. Results demonstrated that marginal costs of diversion from WtE were up to eleven times larger than average costs and dependent on the response in the WtE plant. Marginal cost of diversion were between 39 and 287 € Mg(-1) target fraction when biomass was added in a CHP (from 34 to 303 € Mg(-1) target fraction in the only Power case), between -2 and 300 € Mg(-1) target fraction when RDF was added in a CHP (from -2 to 294 € Mg(-1) target fraction in the only Power case) and between 40 and 303 € Mg(-1) target fraction when no reaction happened in a CHP (from 35 to 296 € Mg(-1) target fraction in the only Power case). Although average costs at WtE facilities were highly influenced by energy selling prices, marginal costs were not (provided a response was initiated at the WtE to keep constant the utilized thermal capacity). Failing to systematically address and include costs in existing waste facilities in decision-making may unintendedly lead to higher overall costs at societal level. To avoid misleading conclusions, economic assessment of alternative SWM solutions should not only consider potential costs associated with alternative treatment but also include marginal costs associated with existing facilities. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Killian, D. A.; Menninger, F. J.; Gorman, T.; Glenn, P.
1988-01-01
The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.
NASA Technical Reports Server (NTRS)
Kimnach, Greg L.; Lebron, Ramon C.
1999-01-01
The Fluid Combustion Facility (FCF) Project and the Power Technology Division at the NASA Glenn Research Center (GRC) at Lewis Field in Cleveland, OH along with the Sundstrand Corporation in Rockford, IL are jointly developing an Electrical Power Converter Unit (EPCU) for the Fluid Combustion Facility to be flown on the International Space Station (ISS). The FCF facility experiment contains three racks: A core rack, a combustion rack, and a fluids rack. The EPCU will be used as the power interface to the ISS 120V(sub dc) power distribution system by each FCF experiment rack which requires 28V(sub dc). The EPCU is a modular design which contains three 120V(sub dc)-to-28V(sub dc) full-bridge, power converters rated at 1 kW(sub e) each bus transferring input relays and solid-state, current-limiting input switches, 48 current-limiting, solid-state, output switches; and control and telemetry hardware. The EPCU has all controls required to autonomously share load demand between the power feeds and--if absolutely necessary--shed loads. The EPCU, which maximizes the usage of allocated ISS power and minimizes loss of power to loads, can be paralleled with other EPCUs. This paper overviews the electrical design and operating characteristics of the EPCU and presents test data from the breadboard design.
7 CFR 1710.252 - Construction work plans-power supply borrowers.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...
7 CFR 1710.252 - Construction work plans-power supply borrowers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...
7 CFR 1710.252 - Construction work plans-power supply borrowers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...
7 CFR 1710.252 - Construction work plans-power supply borrowers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...
7 CFR 1710.252 - Construction work plans-power supply borrowers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems of supporting power pools and to connect with adjacent power suppliers; (4) Improvements..., new substations and substation improvements and replacements, and Systems Control and Data Acquisition... include studies of load flows, voltage regulation, and stability characteristics to demonstrate system...
Motor power factor controller with a reduced voltage starter
NASA Technical Reports Server (NTRS)
Nola, F. J. (Inventor)
1981-01-01
A power factor type motor controller is disclosed in which the conventional power factor constant voltage command signal is replaced during a starting interval with a graduated control voltage. This continuation-impart of a pending patent application (Serial No. 199, 765: Three Phase Factor Controller) provides a means for modifying the operation of the system for a motor start-up interval of 5 to 30 second. Using a ramp generators, an initial ramp-like signal replaces a constant power factor signal supplied by a potentiometer. The ramp-like signal is applied to a 15 terminal where it is summed with an operating power factor signal from phase detectors in order to obtain a control signal for ultimately controlling SCR devices. The SCR devices are turned on at an advancing rate with time responsive to the combination signal described rather than simply a function of a ramp-like signal alone.
Status Report for the Hypervelocity Free-Flight Aerodynamic Facility
NASA Technical Reports Server (NTRS)
Cornelison, Charles J.; Arnold, James O. (Technical Monitor)
1997-01-01
The Hypervelocity Free-Flight Aerodynamic Facility, located at Ames Research Center, is NASA's only aeroballistic facility. During 1997, its model imaging and time history recording systems were the focus of a major refurbishment effort. Specifically the model detection, spark gap (light source); Kerr cell (high speed shuttering); and interval timer sub-systems were inspected, repaired, modified or replaced as required. These refurbishment efforts have fully restored the HFFAF's capabilities to a much better condition, comparable to what it was 15 years ago. Details of this refurbishment effort along with a brief discussion of future upgrade plans are presented.
Test facilities for high power electric propulsion
NASA Technical Reports Server (NTRS)
Sovey, James S.; Vetrone, Robert H.; Grisnik, Stanley P.; Myers, Roger M.; Parkes, James E.
1991-01-01
Electric propulsion has applications for orbit raising, maneuvering of large space systems, and interplanetary missions. These missions involve propulsion power levels from tenths to tens of megawatts, depending upon the application. General facility requirements for testing high power electric propulsion at the component and thrust systems level are defined. The characteristics and pumping capabilities of many large vacuum chambers in the United States are reviewed and compared with the requirements for high power electric propulsion testing.
Skylab Shroud in the Space Power Facility
1970-12-21
The 56-foot tall, 24,400-pound Skylab shroud installed in the Space Power Facility’s vacuum chamber at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station. The Space Power Facility, which began operations in 1969, is the largest high vacuum chamber ever built. The chamber is 100 feet in diameter and 120 feet high. It can produce a vacuum deep enough to simulate the conditions at 300 miles altitude. The Space Power Facility was originally designed to test nuclear-power sources for spacecraft during long durations in a space atmosphere, but it was never used for that purpose. Payload shrouds are aerodynamic fairings to protect the payload during launch and ascent to orbit. The Skylab mission utilized the largest shroud ever attempted. Unlike previous launches, the shroud would not be jettisoned until the spacecraft reached orbit. NASA engineers designed these tests to verify the dynamics of the jettison motion in a simulated space environment. Fifty-four runs and three full-scale jettison tests were conducted from mid-September 1970 to June 1971. The shroud behaved as its designers intended, the detonators all fired, and early design issues were remedied by the final test. The Space Power Facility continues to operate today. The facility can sustain a high vacuum; simulate solar radiation via a 4-megawatt quartz heat lamp array, solar spectrum by a 400-kilowatt arc lamp, and cold environments. Test programs at the facility include high-energy experiments, shroud separation tests, Mars Lander system tests, deployable Solar Sail tests and International Space Station hardware tests.
Safety analysis, 200 Area, Savannah River Plant: Separations area operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Perkins, W.C.; Lee, R.; Allen, P.M.
1991-07-01
The nev HB-Line, located on the fifth and sixth levels of Building 221-H, is designed to replace the aging existing HB-Line production facility. The nev HB-Line consists of three separate facilities: the Scrap Recovery Facility, the Neptunium Oxide Facility, and the Plutonium Oxide Facility. There are three separate safety analyses for the nev HB-Line, one for each of the three facilities. These are issued as supplements to the 200-Area Safety Analysis (DPSTSA-200-10). These supplements are numbered as Sup 2A, Scrap Recovery Facility, Sup 2B, Neptunium Oxide Facility, Sup 2C, Plutonium Oxide Facility. The subject of this safety analysis, the, Plutoniummore » Oxide Facility, will convert nitrate solutions of {sup 238}Pu to plutonium oxide (PuO{sub 2}) powder. All these new facilities incorporate improvements in: (1) engineered barriers to contain contamination, (2) barriers to minimize personnel exposure to airborne contamination, (3) shielding and remote operations to decrease radiation exposure, and (4) equipment and ventilation design to provide flexibility and improved process performance.« less
Low-Frequency Beacon Signal Strength Determination.
1980-01-01
Radio Frequency List , RIS AF-6050-12 [141. Using this value and assum- ing performance for these facilities as indicatcd in FAA Handbook 6050.10, ERP...FAA Handbook 6050. 10 for facilities of appropriate transmitter power, determined from FAA Master Radio Frequency List 6050-12, April 1979...these facilities has not been directly measured and, therefore, values corresponding to transmitter powers given in FAA Master Radio Frequency List , RIS
Status of the University of Rochester tandem upgrade
NASA Astrophysics Data System (ADS)
Cross, Clinton; Miller, Thomas
1986-05-01
The status of the University of Rochester tandem Van de Graaff accelerator upgrade is reviewed. The accelerator upgrade to 18 MV consists of extended tubes, shielded resistors, dead-section ion pumping, two rotating insulating power shaft systems to provide power to the dead sections and terminal, and a pelletron charging system to replace the charging belt. Control of many of the accelerator operating systems will be done by two IBM personal computers. The negative ion injector diffusion pump, isolation transformer, preacceleration high-voltage power supply, and high-voltage corona enclosure will all be replaced. Finally, the SF6 gas handling system will be improved with the addition of a second set of gas dryers and a larger recirculating pump.
Materials, processes, and environmental engineering network
NASA Technical Reports Server (NTRS)
White, Margo M.
1993-01-01
The Materials, Processes, and Environmental Engineering Network (MPEEN) was developed as a central holding facility for materials testing information generated by the Materials and Processes Laboratory. It contains information from other NASA centers and outside agencies, and also includes the NASA Environmental Information System (NEIS) and Failure Analysis Information System (FAIS) data. Environmental replacement materials information is a newly developed focus of MPEEN. This database is the NASA Environmental Information System, NEIS, which is accessible through MPEEN. Environmental concerns are addressed regarding materials identified by the NASA Operational Environment Team, NOET, to be hazardous to the environment. An environmental replacement technology database is contained within NEIS. Environmental concerns about materials are identified by NOET, and control or replacement strategies are formed. This database also contains the usage and performance characteristics of these hazardous materials. In addition to addressing environmental concerns, MPEEN contains one of the largest materials databases in the world. Over 600 users access this network on a daily basis. There is information available on failure analysis, metals and nonmetals testing, materials properties, standard and commercial parts, foreign alloy cross-reference, Long Duration Exposure Facility (LDEF) data, and Materials and Processes Selection List data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Semler, M.O.; Blanchard, R.L.
1989-06-01
Since 1963, the Eastern Environmental Radiation Facility (EERF), US Environmental Protection Agency (USEPA), in cooperation with the US Naval Sea Systems Command (NAVSEA) has surveyed facilities serving nuclear-powered warships on the Atlantic and Pacific coasts and the Gulf of Mexico. These surveys assess whether the operation of nuclear-powered warships, during construction, maintenance, overhaul, or refueling, have created elevated levels of radioactivity. The surveys emphasize sampling those areas and pathways that could expose the public. In 1984, NAVSEA requested that EPA survey all active facilities serving nuclear-powered warships over the next three years. This report contains the results of surveys conductedmore » at Naval facilities located at Mare Island, Alameda, and Hunters Point in the San Francisco region. The locations of these facilities are shown. 3 refs., 4 figs., 3 tabs.« less
Environmental Assessment -- Hydrothermal Geothermal Subprogram
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-06-01
This environmental impact assessment addresses the design, construction, and operation of an electric generating plant (3 to 4 MWe) and research station (Hawaii Geothermal Research Station (HGRS)) in the Puna district on the Island of Hawaii. The facility will include control and support buildings, parking lots, cooling towers, settling and seepage ponds, the generating plant, and a visitors center. Research activities at the facility will evaluate the ability of a successfully flow-tested well (42-day flow test) to provide steam for power generation over an extended period of time (two years). In future expansion, research activities may include direct heat applicationsmore » such as aquaculture and the effects of geothermal fluids on various plant components and specially designed equipment on test modules. Construction-related impacts would be relatively minor. Construction of the facility will require the distance of about 1.7 ha (4.1 acres). No further disturbance is anticipated, unless it becomes necessary to replace the seepage pond with an injection well, because the production well is in service and adjacent roads and transmission lines are adequate. Disruption of competing land uses will be minimal, and loss of wildlife habitat will be acceptable. Noise should not significantly affect wildlife and local residents; the most noise activities (well drilling and flow testing) have been completed. Water use during construction will not be large, and impacts on competing uses are unlikely. Socio-economic impacts will be small because the project will not employ a large number of local residents and few construction workers will need to find local housing.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... & Light Company (CP&L, the licensee) and North Carolina Eastern Municipal Power Agency are the owners of... facility operating license authorizes CP&L to possess, use, and operate the Harris facility. II By..., to the extent held by CP&L. The proposed indirect transfer of control of the Harris license results...
Powerful Electromechanical Linear Actuator
NASA Technical Reports Server (NTRS)
Cowan, John R.; Myers, William N.
1994-01-01
Powerful electromechanical linear actuator designed to replace hydraulic actuator. Cleaner, simpler, and needs less maintenance. Features rotary-to-linear-motion converter with antibacklash gearing and position feedback via shaft-angle resolvers, which measure rotary motion.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Equipment § 193.2401 Scope. After March 31, 2000, each new, replaced, relocated or significantly altered vaporization equipment, liquefaction equipment, and control systems must be...
Utility accommodation policy of the Iowa State Highway Commission.
DOT National Transportation Integrated Search
1970-05-01
This policy covers initial placement, adjustment, relocation and : replacement of utility facilities in, on, above or below all highway : rightof way over:Wnicn tneiowa.~state :Hig'hwaycommission exercises : control of access. It embodies the bas...
47 CFR 90.699 - Transition of the upper 200 channels in the 800 MHz band to EA licensing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... activities necessary for implementing the replacement facilities, including engineering and cost analysis of... procedures provide several alternative methods such as binding arbitration, mediation, or other ADR...
10 CFR 205.320 - Who shall apply.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Electric Power System Permits and Reports... entity who operates an electric power transmission or distribution facility crossing the border of the... Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at...
NASA Technical Reports Server (NTRS)
Dhooge, P. M.; Nimitz, J. S.
2001-01-01
Process analysis can identify opportunities for efficiency improvement including cost reduction, increased safety, improved quality, and decreased environmental impact. A thorough, systematic approach to materials and process selection is valuable in any analysis. New operations and facilities design offer the best opportunities for proactive cost reduction and environmental improvement, but existing operations and facilities can also benefit greatly. Materials and processes that have been used for many years may be sources of excessive resource use, waste generation, pollution, and cost burden that should be replaced. Operational and purchasing personnel may not recognize some materials and processes as problems. Reasons for materials or process replacement may include quality and efficiency improvements, excessive resource use and waste generation, materials and operational costs, safety (flammability or toxicity), pollution prevention, compatibility with new processes or materials, and new or anticipated regulations.
NASA Technical Reports Server (NTRS)
Mason, Angela J.
1999-01-01
An experimental investigation was performed on damaged arresting gear tapes at the Langley Aircraft Landing Dynamics Facility. The arrestment system uses five pairs of tapes to bring the test carriage to a halt. The procedure used to determine when to replace the tapes consists of a close evaluation of each of the 10 tapes after each run. During this evaluation, each tape is examined thoroughly and any damage observed on the tape is recorded. If the damaged tape does not pass the inspection, the tape is replaced with a new one. For the past 13 years, the most commonly seen damage types are edge fray damage and transverse damage. Tests were conducted to determine the maximum tensile strength of a damaged arresting gear tape specimen. The data indicate that tapes exhibiting transverse damage can withstand higher loads than tapes with edge fray damage.
NASA Technical Reports Server (NTRS)
Kotin, A. D.
1978-01-01
State and local regulation of power plant construction and operation of solar power satellite (SPS) receiving stations is presented. Each receiving antenna station occupies a land area 100-200 km square, receives microwave transmissions from the solar power satellite, and converts them into electricity for transmission to the power grid. The long lead time associated with the SPS and the changing status of state and local regulation dictated emphasis on: generic classification of the types of regulation, and identification of regulatory vectors which affect rectenna facilities.
18 CFR 1317.410 - Comparable facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Comparable facilities... facilities. A recipient may provide separate toilet, locker room, and shower facilities on the basis of sex, but such facilities provided for students of one sex shall be comparable to such facilities provided...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark A. Johnson
2012-06-29
Lineage Power and Verizon teamed up to address a DOE funding opportunity focused on improving the power conversion chain in telecommunications facilities and data centers. The project had three significant elements: the design and development of high efficiency and high power three-phase rectifiers by Lineage Power, design and development of software to optimize overall plant energy efficiency by Lineage Power, and a field trial in active Verizon telecommunications facilities where energy consumption was measured before and after efficiency upgrades.
The ERDA/LeRC photovoltaic systems test facility
NASA Technical Reports Server (NTRS)
Forestieri, A. F.
1977-01-01
A test facility was designed, and built to provide a place where photovoltaic systems may be assembled and electrically configured, to evaluate system performance and characteristics. The facility consists of a solar cell array of an initial 10-kW peak power rating, test hardware for several alternate methods of power conditioning, a variety of loads, an electrical energy storage system, and an instrumentation and data acquisition system.
1964-08-14
Aerial view of Gasdynamics facility in 1964 and the 20 inch helium tunnel Part of the Thermal Protection Laboratory used to research materials for heat shield applications and for aerodynamic heating and materials studies of vehicles in planetary atmospheres. This laboratory is comprised of five separate facilities: an Aerodynamic Heating Tunnel, a Heat Transfer Tunnel, two Supersonic Turbulent Ducts, and a High-Power CO2 Gasdynamic Laser. All these facilities are driven by arc-heaters, with the exception of the large, combustion-type laser. The arc-heated facilities are powered by a 20 Megawatt DC power supply. Their effluent gas stream (test gases; Air, N2, He, CO2 and mixtures; flow rates from 0.05 to 5.0 lbs/sec) discharges into a five-stage stream-ejector-driven vacuum system. The vacuum system and power supply are common to the test faciities in building N-238. All of the facilities have high pressure water available at flow rates up to 4, 000 gals/min. The data obtained from these facilities are recorded on magnetic tape or oscillographs. All forms of data can be handled whether from thermo-couples, pressure cells, pyrometers, or radiometers, etc. in addition, closed circuit T. V. monitors and various film cameras are available. (operational since 1962)
Experience with Designing and Implementing a Bundled Payment Program for Total Hip Replacement
Whitcomb, Winthrop F.; Lagu, Tara; Krushell, Robert J.; Lehman, Andrew P.; Greenbaum, Jordan; McGirr, Joan; Pekow, Penelope S.; Calcasola, Stephanie; Benjamin, Evan; Mayforth, Janice; Lindenauer, Peter K.
2015-01-01
Background Bundled payments, also known as episode-based payments, are intended to contain health care costs and promote quality. In 2011 a bundled payment pilot program for total hip replacement was implemented by an integrated health care delivery system in conjunction with a commercial health plan subsidiary. In July 2015 the Centers for Medicare & Medicaid Services (CMS) proposed the Comprehensive Care for Joint Replacement Model to test bundled payment for hip and knee replacement. Methods Stakeholders were identified and a structure for program development and implementation was created. An Oversight Committee provided governance over a Clinical Model Subgroup and a Financial Model Subgroup. Results The pilot program included (1) a clinical model of care encompassing the period from the preoperative evaluation through the third postoperative visit, (2) a pricing model, (3) a program to share savings, and (4) a patient engagement and expectation strategy. Compared to 32 historical controls— patients treated before bundle implementation—45 post-bundle-implementation patients with total hip replacement had a similar length of hospital stay (3.0 versus 3.4 days, p = .24), higher rates of discharge to home or home with services than to a rehabilitation facility (87% versus 63%), similar adjusted median total payments ($22,272 versus $22,567, p = .43), and lower median posthospital payments ($704 versus $1,121, p = .002), and were more likely to receive guideline-consistent care (99% versus 95%, p = .05). Discussion The bundled payment pilot program was associated with similar total costs, decreased posthospital costs, fewer discharges to rehabilitation facilities, and improved quality. Successful implementation of the program hinged on buy-in from stakeholders and close collaboration between stakeholders and the clinical and financial teams. PMID:26289235
Experience with Designing and Implementing a Bundled Payment Program for Total Hip Replacement.
Whitcomb, Winthrop F; Lagu, Tara; Krushell, Robert J; Lehman, Andrew P; Greenbaum, Jordan; McGirr, Joan; Pekow, Penelope S; Calcasola, Stephanie; Benjamin, Evan; Mayforth, Janice; Lindenauer, Peter K
2015-09-01
Bundled payments, also known as episode-based payments, are intended to contain health care costs and promote quality. In 2011 a bundled payment pilot program for total hip replacement was implemented by an integrated health care delivery system in conjunction with a commercial health plan subsidiary. In July 2015 the Centers for Medicare & Medicaid Services (CMS) proposed the Comprehensive Care for Joint Replacement Model to test bundled payment for hip and knee replacement. Stakeholders were identified and a structure for program development and implementation was created. An Oversight Committee provided governance over a Clinical Model Subgroup and a Financial Model Subgroup. The pilot program included (1) a clinical model of care encompassing the period from the preoperative evaluation through the third postoperative visit, (2) a pricing model, (3) a program to share savings, and (4) a patient engagement and expectation strategy. Compared to 32 historical controls-patients treated before bundle implementation-45 post-bundle-implementation patients with total hip replacement had a similar length of hospital stay (3.0 versus 3.4 days, p=.24), higher rates of discharge to home or home with services than to a rehabilitation facility (87% versus 63%), similar adjusted median total payments ($22,272 versus $22,567, p=.43), and lower median posthospital payments ($704 versus $1,121, p=.002), and were more likely to receive guideline-consistent care (99% versus 95%, p=.05). The bundled payment pilot program was associated with similar total costs, decreased posthospital costs, fewer discharges to rehabilitation facilities, and improved quality. Successful implementation of the program hinged on buy-in from stakeholders and close collaboration between stakeholders and the clinical and financial teams.
Interior LED Lighting Technology. Navy Energy Technology Validation (Techval) Program
2015-09-01
usually on most of the time. • Consider replacing existing CFL, high-intensity discharge (HID), or halogen lamp light fixtures/ lamps with LED fixtures... lamps . What is the Technology? An LED is a semiconductor-diode that emits light when power is applied. A driver is used, much as a ballast, to...available in integrated luminaires that can be used to replace existing luminaires. LEDs are also available as direct replacement lamps for many
Power fluctuation reduction methodology for the grid-connected renewable power systems
NASA Astrophysics Data System (ADS)
Aula, Fadhil T.; Lee, Samuel C.
2013-04-01
This paper presents a new methodology for eliminating the influence of the power fluctuations of the renewable power systems. The renewable energy, which is to be considered an uncertain and uncontrollable resource, can only provide irregular electrical power to the power grid. This irregularity creates fluctuations of the generated power from the renewable power systems. These fluctuations cause instability to the power system and influence the operation of conventional power plants. Overall, the power system is vulnerable to collapse if necessary actions are not taken to reduce the impact of these fluctuations. This methodology aims at reducing these fluctuations and makes the generated power capability for covering the power consumption. This requires a prediction tool for estimating the generated power in advance to provide the range and the time of occurrence of the fluctuations. Since most of the renewable energies are weather based, as a result a weather forecast technique will be used for predicting the generated power. The reduction of the fluctuation also requires stabilizing facilities to maintain the output power at a desired level. In this study, a wind farm and a photovoltaic array as renewable power systems and a pumped-storage and batteries as stabilizing facilities are used, since they are best suitable for compensating the fluctuations of these types of power suppliers. As an illustrative example, a model of wind and photovoltaic power systems with battery energy and pumped hydro storage facilities for power fluctuation reduction is included, and its power fluctuation reduction is verified through simulation.
NASA Astrophysics Data System (ADS)
Farkas, Z. D.
2002-03-01
The SLAC beam energy can be increased from the current 50 GeV to 100 GeV, if we change the operating frequency from the present 2856 MHz to 11424 MHz, using technology developed for the NLC. We replace the power distribution system with a proposed NLC distribution system as shown in Fig. 1. The four 3 meter s-band 820 nS .ll time accelerator sections are replaced by six 2 meter x-band 120 nS .ll time sections. Thus the accelerator length per klystron retains the same length, 12 meters. The 4050 65MW- 3.5microS klystrons are replaced by 75MW-1.5microS permanent magnet klystrons developed here and in Japan. The present input to the klystrons would be multiplied by a factor of 4 and possibly ampli.ed. The SLED cavities have to be replaced. The increase in beam voltage is due to the higher elastance to group velocity ratio, higher compression ratio and higher unloaded to external Q ratio of the new SLED cavities. The average power input is reduced because of the narrower klystron pulse width and because the klystron electro-magnets are replaced by permanent magnets.
Feasibility of Ground Testing a Moon and Mars Surface Power Reactor in EBR-II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sheryl Morton; Carl Baily; Tom Hill
Ground testing of a surface fission power system would be necessary to verify the design and validate reactor performance to support safe and sustained human exploration of the Moon and Mars. The Idaho National Laboratory (INL) has several facilities that could be adapted to support a ground test. This paper focuses on the feasibility of ground testing at the Experimental Breeder Reactor II (EBR-II) facility and using other INL existing infrastructure to support such a test. This brief study concludes that the INL EBR-II facility and supporting infrastructure are a viable option for ground testing the surface power system. Itmore » provides features and attributes that offer advantages to locating and performing ground testing at this site, and it could support the National Aeronautics and Space Administration schedules for human exploration of the Moon. This study used the initial concept examined by the U.S. Department of Energy Inter-laboratory Design and Analysis Support Team for surface power, a lowtemperature, liquid-metal, three-loop Brayton power system. With some facility modification, the EBR-II can safely house a test chamber and perform long-term testing of the space reactor power system. The INL infrastructure is available to receive and provide bonded storage for special nuclear materials. Facilities adjacent to EBR-II can provide the clean room environment needed to assemble and store the test article assembly, disassemble the power system at the conclusion of testing, and perform posttest examination. Capability for waste disposal is also available at the INL.« less
Feasibility of Ground Testing a Moon and Mars Surface Power Reactor in EBR-II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morton, Sheryl L.; Baily, Carl E.; Hill, Thomas J.
Ground testing of a surface fission power system would be necessary to verify the design and validate reactor performance to support safe and sustained human exploration of the Moon and Mars. The Idaho National Laboratory (INL) has several facilities that could be adapted to support a ground test. This paper focuses on the feasibility of ground testing at the Experimental Breeder Reactor II (EBR-II) facility and using other INL existing infrastructure to support such a test. This brief study concludes that the INL EBR-II facility and supporting infrastructure are a viable option for ground testing the surface power system. Itmore » provides features and attributes that offer advantages to locating and performing ground testing at this site, and it could support the National Aeronautics and Space Administration schedules for human exploration of the Moon. This study used the initial concept examined by the U.S. Department of Energy Inter-laboratory Design and Analysis Support Team for surface power, a low-temperature, liquid-metal, three-loop Brayton power system. With some facility modification, the EBR-II can safely house a test chamber and perform long-term testing of the space reactor power system. The INL infrastructure is available to receive and provide bonded storage for special nuclear materials. Facilities adjacent to EBR-II can provide the clean room environment needed to assemble and store the test article assembly, disassemble the power system at the conclusion of testing, and perform posttest examination. Capability for waste disposal is also available at the INL.« less
Feasibility of Ground Testing a Moon and Mars Surface Power Reactor in EBR-II
NASA Astrophysics Data System (ADS)
Morton, Sheryl L.; Baily, Carl E.; Hill, Thomas J.; Werner, James E.
2006-01-01
Ground testing of a surface fission power system would be necessary to verify the design and validate reactor performance to support safe and sustained human exploration of the Moon and Mars. The Idaho National Laboratory (INL) has several facilities that could be adapted to support a ground test. This paper focuses on the feasibility of ground testing at the Experimental Breeder Reactor II (EBR-II) facility and using other INL existing infrastructure to support such a test. This brief study concludes that the INL EBR-II facility and supporting infrastructure are a viable option for ground testing the surface power system. It provides features and attributes that offer advantages to locating and performing ground testing at this site, and it could support the National Aeronautics and Space Administration schedules for human exploration of the Moon. This study used the initial concept examined by the U.S. Department of Energy Inter-laboratory Design and Analysis Support Team for surface power, a low-temperature, liquid-metal, three-loop Brayton power system. With some facility modification, the EBR-II can safely house a test chamber and perform long-term testing of the space reactor power system. The INL infrastructure is available to receive and provide bonded storage for special nuclear materials. Facilities adjacent to EBR-II can provide the clean room environment needed to assemble and store the test article assembly, disassemble the power system at the conclusion of testing, and perform posttest examination. Capability for waste disposal is also available at the INL.
THE IMPACT OF EPA'S GREEN POWER PURCHASES
All federal agencies, including EPA, are required to reduce life-cycle greenhouse gas emissions attributed to facility energy use by 30% below 1990 levels by 2010. A key approach to reducing facility greenhouse gas emissions, employed by EPA, involves the purchase of "green power...
This report presents the opportunities for combined heat and power (CHP) applications in the municipal wastewater treatment sector, and it documents the experiences of the wastewater treatment facility (WWTF) operators who have employed CHP.
18 CFR 32.2 - Required exhibits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... facilities used for the generation and transmission of electric energy, indicating on said map the points... Section 32.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTERCONNECTION OF FACILITIES Application for An Order...
18 CFR 32.2 - Required exhibits.
Code of Federal Regulations, 2011 CFR
2011-04-01
... facilities used for the generation and transmission of electric energy, indicating on said map the points... Section 32.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTERCONNECTION OF FACILITIES Application for An Order...
On the possibility of generation of cold and additional electric energy at thermal power stations
NASA Astrophysics Data System (ADS)
Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.
2017-06-01
A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.
Impact of distributed energy resources on the reliability of a critical telecommunications facility.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, David; Zuffranieri, Jason V.; Atcitty, Christopher B.
2006-03-01
This report documents a probabilistic risk assessment of an existing power supply system at a large telecommunications office. The focus is on characterizing the increase in the reliability of power supply through the use of two alternative power configurations. Telecommunications has been identified by the Department of Homeland Security as a critical infrastructure to the United States. Failures in the power systems supporting major telecommunications service nodes are a main contributor to major telecommunications outages. A logical approach to improve the robustness of telecommunication facilities would be to increase the depth and breadth of technologies available to restore power inmore » the face of power outages. Distributed energy resources such as fuel cells and gas turbines could provide one more onsite electric power source to provide backup power, if batteries and diesel generators fail. The analysis is based on a hierarchical Bayesian approach and focuses on the failure probability associated with each of three possible facility configurations, along with assessment of the uncertainty or confidence level in the probability of failure. A risk-based characterization of final best configuration is presented.« less
Wu, Fengluan; Jin, Long; Zheng, Xiaotong; Yan, Bingyun; Tang, Pandeng; Yang, Huikai; Deng, Weili; Yang, Weiqing
2017-11-08
Electrical stimulation in biology and gene expression has attracted considerable attention in recent years. However, it is inconvenient that the electric stimulation needs to be supplied an implanted power-transported wire connecting the external power supply. Here, we fabricated a self-powered composite nanofiber (CNF) and developed an electric generating system to realize electrical stimulation based on the electromagnetic induction effect under an external rotating magnetic field. The self-powered CNFs generating an electric signal consist of modified MWNTs (m-MWNTs) coated Fe 3 O 4 /PCL fibers. Moreover, the output current of the nanocomposites can be increased due to the presence of the magnetic nanoparticles during an external magnetic field is applied. In this paper, these CNFs were employed to replace a bullfrog's sciatic nerve and to realize the effective functional electrical stimulation. The cytotoxicity assays and animal tests of the nanocomposites were also used to evaluate the biocompatibility and tissue integration. These results demonstrated that this self-powered CNF not only plays a role as power source but also can act as an external power supply under an external rotating magnetic field for noninvasive the replacement of injured nerve.
High-power VCSEL systems and applications
NASA Astrophysics Data System (ADS)
Moench, Holger; Conrads, Ralf; Deppe, Carsten; Derra, Guenther; Gronenborn, Stephan; Gu, Xi; Heusler, Gero; Kolb, Johanna; Miller, Michael; Pekarski, Pavel; Pollmann-Retsch, Jens; Pruijmboom, Armand; Weichmann, Ulrich
2015-03-01
Easy system design, compactness and a uniform power distribution define the basic advantages of high power VCSEL systems. Full addressability in space and time add new dimensions for optimization and enable "digital photonic production". Many thermal processes benefit from the improved control i.e. heat is applied exactly where and when it is needed. The compact VCSEL systems can be integrated into most manufacturing equipment, replacing batch processes using large furnaces and reducing energy consumption. This paper will present how recent technological development of high power VCSEL systems will extend efficiency and flexibility of thermal processes and replace not only laser systems, lamps and furnaces but enable new ways of production. High power VCSEL systems are made from many VCSEL chips, each comprising thousands of low power VCSELs. Systems scalable in power from watts to multiple ten kilowatts and with various form factors utilize a common modular building block concept. Designs for reliable high power VCSEL arrays and systems can be developed and tested on each building block level and benefit from the low power density and excellent reliability of the VCSELs. Furthermore advanced assembly concepts aim to reduce the number of individual processes and components and make the whole system even more simple and reliable.
Kumar, Amit; Karmarkar, Amol; Downer, Brian; Vashist, Amit; Adhikari, Deepak; Al Snih, Soham; Ottenbacher, Kenneth
2017-11-01
To compare the performances of 3 comorbidity indices, the Charlson Comorbidity Index, the Elixhauser Comorbidity Index, and the Centers for Medicare & Medicaid Services (CMS) risk adjustment model, Hierarchical Condition Category (HCC), in predicting post-acute discharge settings and hospital readmission for patients after joint replacement. A retrospective study of Medicare beneficiaries with total knee replacement (TKR) or total hip replacement (THR) discharged from hospitals in 2009-2011 (n = 607,349) was performed. Study outcomes were post-acute discharge setting and unplanned 30-, 60-, and 90-day hospital readmissions. Logistic regression models were built to compare the performance of the 3 comorbidity indices using C statistics. The base model included patient demographics and hospital use. Subsequent models included 1 of the 3 comorbidity indices. Additional multivariable logistic regression models were built to identify individual comorbid conditions associated with high risk of hospital readmissions. The 30-, 60-, and 90-day unplanned hospital readmission rates were 5.3%, 7.2%, and 8.5%, respectively. Patients were most frequently discharged to home health (46.3%), followed by skilled nursing facility (40.9%) and inpatient rehabilitation facility (12.7%). The C statistics for the base model in predicting post-acute discharge setting and 30-, 60-, and 90-day readmission in TKR and THR were between 0.63 and 0.67. Adding the Charlson Comorbidity Index, the Elixhauser Comorbidity Index, or HCC increased the C statistic minimally from the base model for predicting both discharge settings and hospital readmission. The health conditions most frequently associated with hospital readmission were diabetes mellitus, pulmonary disease, arrhythmias, and heart disease. The comorbidity indices and CMS-HCC demonstrated weak discriminatory ability to predict post-acute discharge settings and hospital readmission following joint replacement. © 2017, American College of Rheumatology.
Wireless remote monitoring of critical facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tsai, Hanchung; Anderson, John T.; Liu, Yung Y.
A method, apparatus, and system are provided for monitoring environment parameters of critical facilities. A Remote Area Modular Monitoring (RAMM) apparatus is provided for monitoring environment parameters of critical facilities. The RAMM apparatus includes a battery power supply and a central processor. The RAMM apparatus includes a plurality of sensors monitoring the associated environment parameters and at least one communication module for transmitting one or more monitored environment parameters. The RAMM apparatus is powered by the battery power supply, controlled by the central processor operating a wireless sensor network (WSN) platform when the facility condition is disrupted. The RAMM apparatusmore » includes a housing prepositioned at a strategic location, for example, where a dangerous build-up of contamination and radiation may preclude subsequent manned entrance and surveillance.« less
1984-02-01
REQUIREMENT FOR CONSTRUCTION PROJECT: These buildings house electronic equipment, irreplaceable rocket motor design and performance records, a...consists of five subprojects which are to provide modern facilities designed for rocket motor production. These production efficient buildings will...replace facilities which were designed and built in 1930-1942 for artillery shell loading. Four of the sub- projects are for buildings while the fifth
NASA Technical Reports Server (NTRS)
Chapman, David K.; Wells, H. William
1996-01-01
The plant growth facility (PGF), currently under development as a Space Shuttle middeck facility for the support of research on higher plants in microgravity, is presented. The PGF provides controlled fluorescent lighting and the active control of temperature, relative humidity and CO2 concentration. These parameters are designed to be centrally controlled by a dedicated microprocessor. The status of the experiment can be displayed for onboard analysis, and will be automatically archived for post-flight analysis. The facility is designed to operate for 15 days and will provide air filtration to remove ethylene and trace organics with replaceable potassium permanganate filters. Similar ground units will be available for pre-flight experimentation.
2004-01-27
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, STS-114 Mission Specialist Andrew Thomas (left) works with equipment while Mission Specialist Soichi Noguchi watches. Noguchi is with the Japanese Aerospace Exploration Agency (JAXA). They and other crew members are at KSC for equipment familiarization. STS-114 is classified as Logistics Flight 1 to the International Space Station, delivering new supplies and replacing one of the orbital outpost’s Control Moment Gyroscopes (CMGs). STS-114 will also carry a Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. The crew is slated to conduct at least three spacewalks: They will demonstrate repair techniques of the Shuttle’s Thermal Protection System, replace the failed CMG with one delivered by the Shuttle, and install the External Stowage Platform.
Atmospheric Science Data Center
2013-04-16
... includes the area around the damaged Fukushima Dai-ichi nuclear power facility and extends northward along the coast. The ... of the Abukuma River to south of the Fukushima Dai-ichi nuclear power facility, and covers an area of 41 kilometers (25 miles) by 89 ... 2 kilometers (1.2 miles) inland is visible just north of the nuclear power plant. Further up the coast, to the south of Matsukawa-ura Bay, ...
Atmospheric Science Data Center
2018-03-15
... effort has been developed under the Prediction Of Worldwide Energy Resource (POWER) Project funded largely by NASA Earth Applied Sciences ... to NASA's satellite and modeling analysis for Renewable Energy, Sustainable Buildings and Agroclimatology applications. A new POWER ...
77 FR 35306 - Airworthiness Directives; Bell Helicopter Textron, Inc. Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... assemblies (power cable assemblies). This proposed AD is prompted by the determination that the power cable assembly connector (connector) can deteriorate, causing a short in the connector that may lead to a fire. This AD would require replacing the power cable assemblies and their associated parts, and performing...
The complete project will greatly increase the sustainability of small gasoline and/or diesel powered generators that are currently used to supplement or replace an unreliable power grid. This phase will develop the feedstock processing equipment needed to produce syngas bio-...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
75 FR 3460 - Indian River Power Supply, LLC; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-21
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12462-020] Indian River Power Supply, LLC; Notice of Availability of Environmental Assessment January 13, 2010. In accordance..., Massachusetts. In the application, Indian River Power Supply, LLC (exemptee) proposes to replace the project's...
Rosetta Structure Prediction as a Tool for Solving Difficult Molecular Replacement Problems.
DiMaio, Frank
2017-01-01
Molecular replacement (MR), a method for solving the crystallographic phase problem using phases derived from a model of the target structure, has proven extremely valuable, accounting for the vast majority of structures solved by X-ray crystallography. However, when the resolution of data is low, or the starting model is very dissimilar to the target protein, solving structures via molecular replacement may be very challenging. In recent years, protein structure prediction methodology has emerged as a powerful tool in model building and model refinement for difficult molecular replacement problems. This chapter describes some of the tools available in Rosetta for model building and model refinement specifically geared toward difficult molecular replacement cases.
Ultracapacitor-Based Uninterrupted Power Supply System
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.
2011-01-01
The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less downtime for applications and labor involved in replacing an ultracapacitor versus batteries. Also, the lengthy lifespan of this design would greatly reduce the disposal problems posed by lead acid, nickel cadmium, lithium, and nickel metal hydride batteries. This innovation is recyclable by nature, which further reduces system costs. The disposal of ultracapacitors is simple, as they are constructed of non-hazardous components. They are also safer than batteries in that they can be easily discharged, and left indefinitely in a safe, discharged state where batteries cannot.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roby Williams
2012-03-29
The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 wasmore » replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.« less
technical backup material for the OCE NEMP PROGRAM, Development of Criteria for Protection of NIKE-X Power Plant and Facilities Electrical Systems Against Nuclear Electromagnetic Pulse Effects, Protective MEASURES. (Author)
Power Up with Methane Gas: Struthers Water Pollution Control Facility
The city of Struthers received $5.4 million in ARRA funding from the Ohio’s CWSRF for a project that uses methane gas produced at the Struthers Water Pollution Control Facility to power unit treatment processes and offset the facility’s energy footprint.
5 CFR 5801.102 - Prohibited securities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...
5 CFR 5801.102 - Prohibited securities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... licenses for facilities which generate electric energy by means of a nuclear reactor; (2) State or local... reactor or a low-level waste facility; (3) Entities manufacturing or selling nuclear power or test reactors; (4) Architectural-engineering companies providing services relating to a nuclear power reactor...
Hybrid Engine Powered City Car: Fuzzy Controlled Approach
NASA Astrophysics Data System (ADS)
Rahman, Ataur; Mohiuddin, AKM; Hawlader, MNA; Ihsan, Sany
2017-03-01
This study describes a fuzzy controlled hybrid engine powered car. The car is powered by the lithium ion battery capacity of 1000 Wh is charged by the 50 cc hybrid engine and power regenerative mode. The engine is operated with lean mixture at 3000 rpm to charge the battery. The regenerative mode that connects with the engine generates electrical power of 500-600 W for the deceleration of car from 90 km/h to 20 km/h. The regenerated electrical power has been used to power the air-conditioning system and to meet the other electrical power. The battery power only used to propel the car. The regenerative power also found charging the battery for longer operation about 40 minutes and more. The design flexibility of this vehicle starts with whole-vehicle integration based on radical light weighting, drag reduction, and accessory efficiency. The energy efficient hybrid engine cut carbon dioxide (CO2) and nitrogen oxides (N2O) emission about 70-80% as the loads on the crankshaft such as cam-follower and its associated rotating components are replaced by electromagnetic systems, and the flywheel, alternator and starter motor are replaced by a motor generator. The vehicle was tested and found that it was able to travel 70 km/litre with the power of hybrid engine.
Lightning and surge protection of large ground facilities
NASA Astrophysics Data System (ADS)
Stringfellow, Michael F.
1988-04-01
The vulnerability of large ground facilities to direct lightning strikes and to lightning-induced overvoltages on the power distribution, telephone and data communication lines are discussed. Advanced electrogeometric modeling is used for the calculation of direct strikes to overhead power lines, buildings, vehicles and objects within the facility. Possible modes of damage, injury and loss are discussed. Some appropriate protection methods for overhead power lines, structures, vehicles and aircraft are suggested. Methods to mitigate the effects of transients on overhead and underground power systems as well as within buildings and other structures are recommended. The specification and location of low-voltage surge suppressors for the protection of vulnerable hardware such as computers, telecommunication equipment and radar installations are considered. The advantages and disadvantages of commonly used grounding techniques, such as single point, multiple and isolated grounds are compared. An example is given of the expected distribution of lightning flashes to a large airport, its buildings, structures and facilities, as well as to vehicles on the ground.
75 FR 20073 - Repowering Assistance Payments to Eligible Biorefineries
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... be to encourage the use of renewable biomass as a replacement fuel source for fossil fuels used to.... Oversight and Monitoring F. Forms, Regulations, and Instructions G. Exception Authority H. Applicant... and encourage the use of renewable biomass to replace fossil fuels in the production of heat or power...