Sample records for replacement unit oru

  1. Feasibility of flywheel energy storage systems for applications in future space missions

    NASA Technical Reports Server (NTRS)

    Santo, G. Espiritu; Gill, S. P.; Kotas, J. F.; Paschall, R.

    1995-01-01

    The objective of this study was to examine the overall feasibility of deploying electromechanical flywheel systems in space used for excess energy storage. Results of previous Rocketdyne studies have shown that the flywheel concept has a number of advantages over the NiH2 battery, including higher specific energy, longer life and high roundtrip efficiency. Based on this prior work, this current study was broken into four subtasks. The first subtask investigated the feasibility of replacing the NiH2 battery orbital replacement unit (ORU) on the international space station (ISSA) with a flywheel ORU. In addition, a conceptual design of a generic flywheel demonstrator experiment implemented on the ISSA was completed. An assessment of the life cycle cost benefits of replacing the station battery energy storage ORU's with flywheel ORU's was performed. A fourth task generated a top-level development plan for critical flywheel technologies, the flywheel demonstrator experiments and its evolution into the production unit flywheel replacement ORU.

  2. Investigation into the High Voltage Shutdown of the Oxygen Generator System in the International Space Station

    NASA Technical Reports Server (NTRS)

    Carpenter, Joyce E.; Gentry, Gregory J.; Diderich, Greg S.; Roy, Robert J.; Golden, John L.; VanKeuren, Steve; Steele, John W.; Rector, Tony J.; Varsik, Jerome D.; Montefusco, Daniel J.; hide

    2012-01-01

    The Oxygen Generation System (OGS) Hydrogen Dome Assembly Orbital Replacement Unit (ORU) serial number 00001 suffered a cell stack high-voltage shutdown on July 5, 2010. The Hydrogen Dome Assembly ORU was removed and replaced with the on-board spare ORU serial number 00002 to maintain OGS operation. The Hydrogen Dome Assembly ORU was returned from ISS on STS-133/ULF-5 in March 2011 with test, teardown and evaluation (TT&E) and failure analysis to follow.

  3. OGS Hydrogen Sensor ORU R&R

    NASA Image and Video Library

    2012-04-18

    ISS030-E-236919 (18 April 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, works with the Oxygen Generator System (OGS) rack in the Tranquility node of the International Space Station. Burbank unpowered the OGS, purged the hydrogen sensor Orbital Replacement Unit (ORU) with the Hydrogen Sensor ORU Purge Adapter (HOPA) for return to Earth, and replaced the hydrogen sensor with a new spare, then cleaned the rack Avionics Air Assembly (AAA).

  4. Parallel Fin ORU Thermal Interface for space applications. [Orbital Replaceable Unit

    NASA Technical Reports Server (NTRS)

    Stobb, C. A.; Limardo, Jose G.

    1992-01-01

    The Parallel Fin Thermal Interface has been developed as an Orbital Replaceable Unit (ORU) interface. The interface transfers heat from an ORU baseplate to a Heat Acquisition Plate (HAP) through pairs of fins sandwiched between insert plates that press against the fins with uniform pressure. The insert plates are spread apart for ORU baseplate separation and replacement. Two prototype interfaces with different fin dimensions were built (Model 140 and 380). Interfacing surface samples were found to have roughnesses of 56 to 89 nm. Conductance values of 267 to 420 W/sq m C were obtained for the 140 model in vacuum with interface pressures of 131 to 262 kPa (19 to 38 psi). Vacuum conductances ranging from 176 to 267 W/sq m F were obtained for the 380 model at interface pressures of 97 to 152 kPa (14 and 22 psi). Correlations from several sources were found to agree with test data within 20 percent using thermal math models of the interfaces.

  5. Investigation of International Space Station Major Constituent Analyzer Anomalous ORU 02 Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Burchfield, David E.; Pargellis, Andrew; Tissandier, Amber; Erwin, Phillip M.; Thoresen, Souzan; Gentry, Greg; Granahan, John; Matty, Chris

    2012-01-01

    The Major Constituent Analyzer (MCA) is a mass spectrometer-based instrument designed to provide critical monitoring of six major atmospheric constituents; nitrogen, oxygen, hydrogen, carbon dioxide, methane, and water vapor on-board the International Space Station. It is an integral part of the Environmental Control and Life Support System (ECLSS). The MCA system is comprised of seven orbit-replaceable units (ORUs) that provide flexibility in maintaining the MCA. Of these, ORU 02, the analyzer assembly requires replacement every 1 to 2 years due to the consumption of limited life components including the ion pump and ion source filaments. Typically, ORU 02s that reach end of life are swapped out of the MCA on orbit and replaced with the on-orbit spare. The replaced ORU 02 is then cycled through the OEM for refurbishment and returned to service. Recently, two refurbished ORU 02s, serial numbers F0001 and F0003, failed on orbit shortly after being installed into the MCA. Both ORU 02s were returned to ground for TT&E and a failure investigation. The failure signatures were reproduced on the ground and the investigation determined that both ORU 02 failures involve either the ion source or the ion source control electronics. This paper discusses the results of the failure investigation, the steps required to refurbish the ORU 02s, and the corrective actions that are being incorporated into the build and refurbishment process to preclude the reoccurrence of these failures in the future.

  6. Investigation of International Space Station Major Constituent Analyzer Anomalous ORU 02 Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Burchfield, David E.; Trubey, Richard; Denson, Steve; Tissandier, Amber; Gentry, Greg; Granahan, John; Matty, Chris

    2011-01-01

    The Major Constituent Analyzer (MCA) is a mass spectrometer-based instrument designed to provide critical monitoring of six major atmospheric constituents; nitrogen, oxygen, hydrogen, carbon dioxide, methane, and water vapor on-board the International Space Station. It is an integral part of the Environmental Control and Life Support System (ECLSS). The MCA system is comprised of seven orbit-replaceable units (ORUs) that provide flexibility in maintaining the MCA. Of these, ORU 02, the analyzer assembly requires replacement every 1 to 2 years due to the consumption of limited life components including the ion pump and ion source filaments. Typically, ORU 02s that reach end of life are swapped out of the MCA on orbit and replaced with the on-orbit spare. The replaced ORU 02 is then returned to the OEM for refurbishment and is then return to service. Recently, 2 refurbished ORU 02s, serial numbers F0001 and F0003, failed on orbit shortly after being installed into the MCA. Both ORU 02s have been returned to ground for TT&E, and a failure investigation is underway. The failure signatures have been reproduced on the ground and an initial investigation has determined that both ORU 02 failures involve either the ion source or the ion source control electronics. This paper discusses the results of the failure investigation, the steps required to refurbish the ORU 02s, and the risk mitigation steps that are being incorporated into the refurbishment process to preclude the reoccurrence of these failures in the future

  7. Improving the Estimates of International Space Station (ISS) Induced K-Factor Failure Rates for On-Orbit Replacement Unit (ORU) Supportability Analyses

    NASA Technical Reports Server (NTRS)

    Anderson, Leif F.; Harrington, Sean P.; Omeke, Ojei, II; Schwaab, Douglas G.

    2009-01-01

    This is a case study on revised estimates of induced failure for International Space Station (ISS) on-orbit replacement units (ORUs). We devise a heuristic to leverage operational experience data by aggregating ORU, associated function (vehicle sub -system), and vehicle effective' k-factors using actual failure experience. With this input, we determine a significant failure threshold and minimize the difference between the actual and predicted failure rates. We conclude with a discussion on both qualitative and quantitative improvements the heuristic methods and potential benefits to ISS supportability engineering analysis.

  8. Spline screw payload fastening system

    NASA Technical Reports Server (NTRS)

    Vranish, John M. (Inventor)

    1993-01-01

    A system for coupling an orbital replacement unit (ORU) to a space station structure via the actions of a robot and/or astronaut is described. This system provides mechanical and electrical connections both between the ORU and the space station structure and between the ORU and the ORU and the robot/astronaut hand tool. Alignment and timing features ensure safe, sure handling and precision coupling. This includes a first female type spline connector selectively located on the space station structure, a male type spline connector positioned on the orbital replacement unit so as to mate with and connect to the first female type spline connector, and a second female type spline connector located on the orbital replacement unit. A compliant drive rod interconnects the second female type spline connector and the male type spline connector. A robotic special end effector is used for mating with and driving the second female type spline connector. Also included are alignment tabs exteriorally located on the orbital replacement unit for berthing with the space station structure. The first and second female type spline connectors each include a threaded bolt member having a captured nut member located thereon which can translate up and down the bolt but are constrained from rotation thereabout, the nut member having a mounting surface with at least one first type electrical connector located on the mounting surface for translating with the nut member. At least one complementary second type electrical connector on the orbital replacement unit mates with at least one first type electrical connector on the mounting surface of the nut member. When the driver on the robotic end effector mates with the second female type spline connector and rotates, the male type spline connector and the first female type spline connector lock together, the driver and the second female type spline connector lock together, and the nut members translate up the threaded bolt members carrying the first type electrical connector up to the complementary second type connector for interconnection therewith.

  9. STS-82 Discovery payloads being integrated in VPF

    NASA Image and Video Library

    1997-01-30

    KENNEDY SPACE CENTER, FLORIDA STS-82 PREPARATIONS VIEW --- Workers in the Kennedy Space Center (KSC) Vertical Processing Facility (VPF) prepare to integrate the Small Orbital Replacement Unit (Oru) Protective Enclosure (Sope), shown here being lifted, with the ORU Carrier shelf, in background, as part of the pre-launch processing for STS-82. The mission, the second one devoted to servicing of the HST, is targeted for launch on February 11, 1997.

  10. OGS Maintenance

    NASA Image and Video Library

    2010-07-21

    ISS024-E-009246 (21 July 2010) --- NASA astronaut Tracy Caldwell Dyson, Expedition 24 flight engineer, is pictured during troubleshooting operations of the Oxygen Generator System (OGS) hardware and replacement of an H2 (hydrogen) Dome Orbit Replaceable Unit (ORU) in the Destiny laboratory of the International Space Station.

  11. Parametric Mass Reliability Study

    NASA Technical Reports Server (NTRS)

    Holt, James P.

    2014-01-01

    The International Space Station (ISS) systems are designed based upon having redundant systems with replaceable orbital replacement units (ORUs). These ORUs are designed to be swapped out fairly quickly, but some are very large, and some are made up of many components. When an ORU fails, it is replaced on orbit with a spare; the failed unit is sometimes returned to Earth to be serviced and re-launched. Such a system is not feasible for a 500+ day long-duration mission beyond low Earth orbit. The components that make up these ORUs have mixed reliabilities. Components that make up the most mass-such as computer housings, pump casings, and the silicon board of PCBs-typically are the most reliable. Meanwhile components that tend to fail the earliest-such as seals or gaskets-typically have a small mass. To better understand the problem, my project is to create a parametric model that relates both the mass of ORUs to reliability, as well as the mass of ORU subcomponents to reliability.

  12. High-Repeatability, Robot Friendly, ORU Interface

    NASA Technical Reports Server (NTRS)

    Voellmer, George M. (Inventor)

    1992-01-01

    A robot-friendly coupling device for an Orbital Replacement Unit (ORU). The invention will provide a coupling that is detached and attached remotely by a robot. The design of the coupling must allow for slight misalignments, over torque protection, and precision placement. This is accomplished by using of a triangular interface having three components. A base plate assembly is located on an attachment surface, such as a satellite. The base plate assembly has a cup member, a slotted member, and a post member. The ORU that the robot attaches to the base plate assembly has an ORU plate assembly with two cone members and a post member which mate to the base plate assembly. As the two plates approach one another, one cone member of the ORU plate assembly only has to be placed accurately enough to fall into the cup member of the base plate assembly. The cup forces alignment until a second cone falls into a slotted member which provides final alignment. A single bolt is used to attach the two plates. Two deflecting plates are attached to the backs of the plates. When pressure is applied to the center of the deflecting plates, the force is distributed preventing the ORU & base plates from deflecting. This accounts for precision in the placement of the article.

  13. Enhanced Lighting Techniques and Augmented Reality to Improve Human Task Performance

    NASA Technical Reports Server (NTRS)

    Maida, James C.; Bowen, Charles K.; Pace, John W.

    2005-01-01

    One of the most versatile tools designed for use on the International Space Station (ISS) is the Special Purpose Dexterous Manipulator (SPDM) robot. Operators for this system are trained at NASA Johnson Space Center (JSC) using a robotic simulator, the Dexterous Manipulator Trainer (DMT), which performs most SPDM functions under normal static Earth gravitational forces. The SPDM is controlled from a standard Robotic Workstation. A key feature of the SPDM and DMT is the Force/Moment Accommodation (FMA) system, which limits the contact forces and moments acting on the robot components, on its payload, an Orbital Replaceable Unit (ORU), and on the receptacle for the ORU. The FMA system helps to automatically alleviate any binding of the ORU as it is inserted or withdrawn from a receptacle, but it is limited in its correction capability. A successful ORU insertion generally requires that the reference axes of the ORU and receptacle be aligned to within approximately 0.25 inch and 0.5 degree of nominal values. The only guides available for the operator to achieve these alignment tolerances are views from any available video cameras. No special registration markings are provided on the ORU or receptacle, so the operator must use their intrinsic features in the video display to perform the pre-insertion alignment task. Since optimum camera views may not be available, and dynamic orbital lighting conditions may limit viewing periods, long times are anticipated for performing some ORU insertion or extraction operations. This study explored the feasibility of using augmented reality (AR) to assist with SPDM operations. Geometric graphical symbols were overlaid on the end effector (EE) camera view to afford cues to assist the operator in attaining adequate pre-insertion ORU alignment.

  14. New Method for Updating Mean Time Between Failure for ISS Orbital Replaceable Units Consultation Report

    NASA Technical Reports Server (NTRS)

    Parsons, Vickie S.

    2009-01-01

    A request to conduct a peer review of the International Space Station (ISS) proposal to use Bayesian methodology for updating Mean Time Between Failure (MTBF) for ISS Orbital Replaceable Units (ORU) was submitted to the NASA Engineering and Safety Center (NESC) on September 20, 2005. The results were requested by October 20, 2005 in order to be available during the process of reworking the current ISS flight manifest. The results are included in this report.

  15. Expedition 28 Crew Members during IFM

    NASA Image and Video Library

    2011-06-30

    ISS028-E-010781 (30 June 2011) --- NASA astronauts Mike Fossum (left) and Ron Garan, both Expedition 28 flight engineers, perform in-flight maintenance in the Harmony node of the International Space Station. The maintenance involved removing and replacing the failed Common Cabin Air Assembly (CCAA) heat exchanger in the P3 Midbay with a new spare Heat Exchanger Orbit Replaceable Unit (HX ORU) and lines.

  16. Vibration Isolation for Launch of a Space Station Orbital Replacement Unit

    NASA Technical Reports Server (NTRS)

    Maly, Joseph R.; Sills, Joel W., Jr.; Pendleton, Scott C.; James, George H., III; Mimovich, Mark

    2004-01-01

    Delivery of Orbital Replacement Units (ORUs) to on-orbit destinations such a the International Space Station (ISS) and the Hubble Space Telescope is an important component of the space program. ORUs are integrated on orbit with space assets to maintain and upgrade functionality. For ORUs comprised of sensitive equipment, the dynamic launch environment drives design and testing requirements, and high frequency random vibrations are generally the cause for failure. Vibration isolation can mitigate the structure-borne vibration environment during launch, and hardware has been developed that can provide a reduced environment for current and future launch environments. Random vibration testing of one ORU to equivalent Space Shuttle launch levels revealed that its qualification and acceptance requirements were exceeded. An isolation system was designed to mitigate the structure-borne launch vibration environment. To protect this ORU, the random vibration levels at 50 Hz must be attenuated by a factor of two and those at higher frequencies even more. Design load factors for Shuttle launch are high, so a metallic load path is needed to maintain strength margins. Isolation system design was performed using a finite element model of the ORU on its carrier with representative disturbance inputs. Iterations on the modelled to an optimized design based on flight proven SoftRide MultiFlex isolators. Component testing has been performed on prototype isolators to validate analytical predictions.

  17. High Reliability Robot Friendly ORU Interface

    NASA Technical Reports Server (NTRS)

    Voellmer, George M. (Inventor)

    1991-01-01

    Presented here is a robot friendly coupling device for an orbital replacement unit (ORU). The invention will provide a coupling that is detached and attached remotely by a robot. The design of the coupling must allow for slight misalignments, over-torque protection, and precision placement. This is accomplished by means of a triangular interface comprising three components. A base plate assembly is located on an attachment surface, such as a satellite. The base plate assembly has a cup member, a slotted member, and a post member. The ORU that the robot attaches to the base plate assembly has an ORU plate assembly with two cone members and a post member which mate to the base plate assembly. As the two plates approach one another, one cone member of the ORU plate assembly has to be placed accurately enough to fall into the cup member of the base plate assembly. The cup member forces alignment until a second cone falls into a slotted member which provides final alignment. A single bolt is used to attach the two plates. Two deflecting plates are attached to the backs of the plates. When pressure is applied to the center of the deflecting plates, the force is distributed preventing the ORU and base plates from deflecting. This accounts for precision in the placement of the article. The novelty is believed to reside in using deflecting plates in conjunction with kinematic mounts to provide distributed forces to the two members.

  18. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    NASA Technical Reports Server (NTRS)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  19. Hubble Space Telescope (HST) at Lockheed Facility during preflight assembly

    NASA Image and Video Library

    1988-03-31

    A mechanical arm positions the axial scientific instrument (SI) module (orbital replacement unit (ORU)) just outside the open doors of the Hubble Space Telescope (HST) Support System Module (SSM) as clean-suited technicians oversee the process. HST assembly is being completed at the Lockheed Facility in Sunnyvale, California.

  20. International Space Station Major Constituent Analyzer On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Philip M.; Thoresen, Souzan; Granahan, John; Matty, Chris

    2010-01-01

    The Major Constituent Analyzer is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic changeout, including the analyzer (ORU 02) and the verification gas assembly (ORU 08). The longest lasting ORU 02 was recently replaced after a record service length of 1033 days. The comparatively high performance duration may be attributable to a reduced inlet flow rate into the analyzer, resulting in increased ion pump lifetime; however, there may be other factors as well. A recent schedule slip for delivery of replacement verification gas led to a demonstration that the calibration interval could be extended on a short-term basis. An analysis of ORU 08 performance characteristics indicates that it is possible to temporarily extend the calibration interval from 6 weeks to 12 weeks if necessary.

  1. Development of Methods to Evaluate Safer Flight Characteristics

    NASA Technical Reports Server (NTRS)

    Basciano, Thomas E., Jr.; Erickson, Jon D.

    1997-01-01

    The goal of the proposed research is to begin development of a simulation that models the flight characteristics of the Simplified Aid For EVA Rescue (SAFER) pack. Development of such a simulation was initiated to ultimately study the effect an Orbital Replacement Unit (ORU) has on SAFER dynamics. A major function of this program will be to calculate fuel consumption for many ORUs with different masses and locations. This will ultimately determine the maximum ORU mass an astronaut can carry and still perform a self-rescue without jettisoning the unit. A second primary goal is to eventually simulate relative motion (vibration) between the ORU and astronaut. After relative motion is accurately modeled it will be possible to evaluate the robustness of the control system and optimize performance as needed. The first stage in developing the simulation is the ability to model a standardized, total, self-rescue scenario, making it possible to accurately compare different program runs. In orbit an astronaut has only limited data and will not be able to follow the most fuel efficient trajectory; therefore, it is important to correctly model the procedures an astronaut would use in orbit so that good fuel consumption data can be obtained. Once this part of the program is well tested and verified, the vibration (relative motion) of the ORU with respect to the astronaut can be studied.

  2. Burbank performs Part 1 of the WRS-1 Repair

    NASA Image and Video Library

    2012-03-08

    ISS030-E-128752 (8 March 2012) --- NASA astronaut Dan Burbank, Expedition 30 commander, performs part one of the Water Recovery System-1 (WRS-1) repair in the Tranquility node of the International Space Station. Burbank removed and replaced the failed Catalytic Reactor (CR), and installed a temporary filter kit between the new CR and the Microbial Check Valve (MCV) to support a system flush of the new Orbital Replacement Unit (ORU).

  3. Development and evaluation of a predictive algorithm for telerobotic task complexity

    NASA Technical Reports Server (NTRS)

    Gernhardt, M. L.; Hunter, R. C.; Hedgecock, J. C.; Stephenson, A. G.

    1993-01-01

    There is a wide range of complexity in the various telerobotic servicing tasks performed in subsea, space, and hazardous material handling environments. Experience with telerobotic servicing has evolved into a knowledge base used to design tasks to be 'telerobot friendly.' This knowledge base generally resides in a small group of people. Written documentation and requirements are limited in conveying this knowledge base to serviceable equipment designers and are subject to misinterpretation. A mathematical model of task complexity based on measurable task parameters and telerobot performance characteristics would be a valuable tool to designers and operational planners. Oceaneering Space Systems and TRW have performed an independent research and development project to develop such a tool for telerobotic orbital replacement unit (ORU) exchange. This algorithm was developed to predict an ORU exchange degree of difficulty rating (based on the Cooper-Harper rating used to assess piloted operations). It is based on measurable parameters of the ORU, attachment receptacle and quantifiable telerobotic performance characteristics (e.g., link length, joint ranges, positional accuracy, tool lengths, number of cameras, and locations). The resulting algorithm can be used to predict task complexity as the ORU parameters, receptacle parameters, and telerobotic characteristics are varied.

  4. The telerobot testbed: An architecture for remote servicing

    NASA Technical Reports Server (NTRS)

    Matijevic, J. R.

    1990-01-01

    The NASA/OAST Telerobot Testbed will reach its next increment in development by the end of FY-89. The testbed will have the capability for: force reflection in teleoperation, shared control, traded control, operator designate and relative update. These five capabilities will be shown in a module release and exchange operation using mockups of Orbital Replacement Units (ORU). This development of the testbed shows examples of the technologies needed for remote servicing, particularly under conditions of delay in transmissions to the servicing site. Here, the following topics are presented: the system architecture of the testbed which incorporates these telerobotic technologies for servicing, the implementation of the five capabilities and the operation of the ORU mockups.

  5. Integration of communications and tracking data processing simulation for space station

    NASA Technical Reports Server (NTRS)

    Lacovara, Robert C.

    1987-01-01

    A simplified model of the communications network for the Communications and Tracking Data Processing System (CTDP) was developed. It was simulated by use of programs running on several on-site computers. These programs communicate with one another by means of both local area networks and direct serial connections. The domain of the model and its simulation is from Orbital Replaceable Unit (ORU) interface to Data Management Systems (DMS). The simulation was designed to allow status queries from remote entities across the DMS networks to be propagated through the model to several simulated ORU's. The ORU response is then propagated back to the remote entity which originated the request. Response times at the various levels were investigated in a multi-tasking, multi-user operating system environment. Results indicate that the effective bandwidth of the system may be too low to support expected data volume requirements under conventional operating systems. Instead, some form of embedded process control program may be required on the node computers.

  6. SSSFD manipulator engineering using statistical experiment design techniques

    NASA Technical Reports Server (NTRS)

    Barnes, John

    1991-01-01

    The Satellite Servicer System Flight Demonstration (SSSFD) program is a series of Shuttle flights designed to verify major on-orbit satellite servicing capabilities, such as rendezvous and docking of free flyers, Orbital Replacement Unit (ORU) exchange, and fluid transfer. A major part of this system is the manipulator system that will perform the ORU exchange. The manipulator must possess adequate toolplate dexterity to maneuver a variety of EVA-type tools into position to interface with ORU fasteners, connectors, latches, and handles on the satellite, and to move workpieces and ORUs through 6 degree of freedom (dof) space from the Target Vehicle (TV) to the Support Module (SM) and back. Two cost efficient tools were combined to perform a study of robot manipulator design parameters. These tools are graphical computer simulations and Taguchi Design of Experiment methods. Using a graphics platform, an off-the-shelf robot simulation software package, and an experiment designed with Taguchi's approach, the sensitivities of various manipulator kinematic design parameters to performance characteristics are determined with minimal cost.

  7. Flight Hydrogen Sensor for use in the ISS Oxygen Generation Assembly

    NASA Technical Reports Server (NTRS)

    MSadoques, George, Jr.; Makel, Darby B.

    2005-01-01

    This paper provides a description of the hydrogen sensor Orbital Replacement Unit (ORU) used on the Oxygen Generation Assembly (OGA), to be operated on the International Space Station (ISS). The hydrogen sensor ORU is being provided by Makel Engineering, Inc. (MEI) to monitor the oxygen outlet for the presence of hydrogen. The hydrogen sensor ORU is a triple redundant design where each sensor converts raw measurements to actual hydrogen partial pressure that is reported to the OGA system controller. The signal outputs are utilized for system shutdown in the event that the hydrogen concentration in the oxygen outlet line exceeds the specified shutdown limit. Improvements have been made to the Micro-Electro-Mechanical Systems (MEMS) based sensing element, screening, and calibration process to meet OGA operating requirements. Two flight hydrogen sensor ORUs have successfully completed the acceptance test phase. This paper also describes the sensor s performance during acceptance testing, additional tests planned to extend the operational performance calibration cycle, and integration with the OGA system.

  8. Space station electrical power system availability study

    NASA Technical Reports Server (NTRS)

    Turnquist, Scott R.; Twombly, Mark A.

    1988-01-01

    ARINC Research Corporation performed a preliminary reliability, and maintainability (RAM) anlaysis of the NASA space station Electric Power Station (EPS). The analysis was performed using the ARINC Research developed UNIRAM RAM assessment methodology and software program. The analysis was performed in two phases: EPS modeling and EPS RAM assessment. The EPS was modeled in four parts: the insolar power generation system, the eclipse power generation system, the power management and distribution system (both ring and radial power distribution control unit (PDCU) architectures), and the power distribution to the inner keel PDCUs. The EPS RAM assessment was conducted in five steps: the use of UNIRAM to perform baseline EPS model analyses and to determine the orbital replacement unit (ORU) criticalities; the determination of EPS sensitivity to on-orbit spared of ORUs and the provision of an indication of which ORUs may need to be spared on-orbit; the determination of EPS sensitivity to changes in ORU reliability; the determination of the expected annual number of ORU failures; and the integration of the power generator system model results with the distribution system model results to assess the full EPS. Conclusions were drawn and recommendations were made.

  9. International Space Station Lithium-Ion Battery Start-Up

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; North, Tim; Bowens, Ebony; Balcer, Sonia

    2017-01-01

    International Space Station Lithium-Ion Battery Start-Up.The International Space Station (ISS) primary Electric Power System (EPS) was originally designed to use Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. As the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-Ion ORU and cell life testing project. The first set of 6 Li-ion battery replacements were launched in December 2016 and deployed in January 2017. This paper will discuss the Li-ion battery on-orbit start-up and the status of the Li-Ion cell and ORU life cycle testing.

  10. International Space Station (ISS) Orbital Replaceable Unit (ORU) Wet Storage Risk Assessment

    NASA Technical Reports Server (NTRS)

    Squire, Michael D.; Rotter, Henry A.; Lee, Jason; Packham, Nigel; Brady, Timothy K.; Kelly, Robert; Ott, C. Mark

    2014-01-01

    The International Space Station (ISS) Program requested the NASA Engineering and Safety Center (NESC) to evaluate the risks posed by the practice of long-term wet storage of ISS Environmental Control and Life Support (ECLS) regeneration system orbital replacement units (ORUs). The ISS ECLS regeneration system removes water from urine and humidity condensate and converts it into potable water and oxygen. A total of 29 ORUs are in the ECLS system, each designed to be replaced by the ISS crew when necessary. The NESC assembled a team to review the ISS ECLS regeneration system and evaluate the potential for biofouling and corrosion. This document contains the outcome of the evaluation.

  11. Improving Robotic Operator Performance Using Augmented Reality

    NASA Technical Reports Server (NTRS)

    Maida, James C.; Bowen, Charles K.; Pace, John W.

    2007-01-01

    The Special Purpose Dexterous Manipulator (SPDM) is a two-armed robot that functions as an extension to the end effector of the Space Station Robotics Manipulator System (SSRMS), currently in use on the International Space Station (ISS). Crew training for the SPDM is accomplished using a robotic hardware simulator, which performs most of SPDM functions under normal static Earth gravitational forces. Both the simulator and SPDM are controlled from a standard robotic workstation using a laptop for the user interface and three monitors for camera views. Most operations anticipated for the SPDM involve the manipulation, insertion, and removal of any of several types of Orbital Replaceable Unit (ORU), modules which control various ISS functions. Alignment tolerances for insertion of the ORU into its receptacle are 0.25 inch and 0.5 degree from nominal values. The pre-insertion alignment task must be performed within these tolerances by using available video camera views of the intrinsic features of the ORU and receptacle, without special registration markings. Since optimum camera views may not be available, and dynamic orbital lighting conditions may limit periods of viewing, a successful ORU insertion operation may require an extended period of time. This study explored the feasibility of using augmented reality (AR) to assist SPDM operations. Geometric graphical symbols were overlaid on one of the workstation monitors to afford cues to assist the operator in attaining adequate pre-insertion ORU alignment. Twelve skilled subjects performed eight ORU insertion tasks using the simulator with and without the AR symbols in a repeated measures experimental design. Results indicated that using the AR symbols reduced pre-insertion alignment error for all subjects and reduced the time to complete pre-insertion alignment for most subjects.

  12. Mass and Reliability System (MaRS)

    NASA Technical Reports Server (NTRS)

    Barnes, Sarah

    2016-01-01

    The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including: operation hours, random/nonrandom failures, software/hardware failures, quantity, orbital replaceable units (ORU), date of placement, unit weight, frequency of part, etc. The motivation for creating such a database will be the development of a mass/reliability parametric model to estimate mass required for replacement parts. Once complete, engineers working on future space flight missions will have access a mean time to failures and on parts along with their mass, this will be used to make proper decisions for long duration space flight missions

  13. Soldering in a Reduced Gravity Environment (SoRGE)

    NASA Technical Reports Server (NTRS)

    Easton, John W.; Struk, Peter M.

    2012-01-01

    Future long-duration human exploration missions will be challenged by constraints on mass and volume allocations available for spare parts. Addressing this challenge will be critical to the success of these missions. As a result, it is necessary to consider new approaches to spacecraft maintenance and repair that reduce the need for large replacement components. Currently, crew members on the International Space Station (ISS) recover from faults by removing and replacing, using backup systems, or living without the function of Orbital Replacement Units (ORUs). These ORUs are returned to a depot where the root cause of the failure is determined and the ORU is repaired. The crew has some limited repair capability with the Modulation/DeModulation (MDM) ORU, where circuit cards are removed and replace in faulty units. The next step to reducing the size of the items being replaced would be to implement component-level repair. This mode of repair has been implemented by the U.S. Navy in an operational environment and is now part of their standard approach for maintenance. It is appropriate to consider whether this approach can be adapted for future spaceflight operations. To this end, the Soldering in a Reduced Gravity Environment (SoRGE) experiment studied the effect of gravity on the formation of solder joints on electronic circuit boards. This document describes the SoRGE experiment, the analysis methods, and results to date. This document will also contain comments from the crew regarding their experience conducting the SoRGE experiment as well as recommendations for future improvements. Finally, this document will discuss the plans for the SoRGE samples which remain on ISS.

  14. Probability and Confidence Trade-space (PACT) Evaluation: Accounting for Uncertainty in Sparing Assessments

    NASA Technical Reports Server (NTRS)

    Anderson, Leif; Box, Neil; Carter, Katrina; DiFilippo, Denise; Harrington, Sean; Jackson, David; Lutomski, Michael

    2012-01-01

    There are two general shortcomings to the current annual sparing assessment: 1. The vehicle functions are currently assessed according to confidence targets, which can be misleading- overly conservative or optimistic. 2. The current confidence levels are arbitrarily determined and do not account for epistemic uncertainty (lack of knowledge) in the ORU failure rate. There are two major categories of uncertainty that impact Sparing Assessment: (a) Aleatory Uncertainty: Natural variability in distribution of actual failures around an Mean Time Between Failure (MTBF) (b) Epistemic Uncertainty : Lack of knowledge about the true value of an Orbital Replacement Unit's (ORU) MTBF We propose an approach to revise confidence targets and account for both categories of uncertainty, an approach we call Probability and Confidence Trade-space (PACT) evaluation.

  15. Using Optimization to Improve NASA Extravehicular Activity Planning

    DTIC Science & Technology

    2012-09-01

    Mission Operations Directorate NASA National Aeronautics and Space Administration NBL Neutral Buoyancy Laboratory ORU Orbital Replacement Unit PET...training is conducted in the Neutral Buoyancy Lab ( NBL ) for full dress rehearsal. The active response gravity offload system is a facility that helps...three NBL runs are dedicated to task and timeline duration validation in normal circumstances, with the possibility of more if the tasks and procedures

  16. STS-82 Discovery payloads being integrated in VPF

    NASA Image and Video Library

    1997-01-30

    KENNEDY SPACE CENTER, FLORIDA STS-82 PREPARATIONS VIEW --- Payload processing workers in the Kennedy Space Center (KSC) Vertical Processing Facility (VPF) prepare to integrate the Space Telescope Imaging Spectrograph (STIS), suspended at center, into the Orbiter Replacement Unit (ORU) Carrier and Scientific Instrument Protective Enclosure (SIPE). STIS will replace the Goddard High Resolution Spectrograph (GHRS) on the Hubble Space Telescope (HST). Four of the seven STS-82 crew members will perform a series of spacewalks to replace two scientific instruments with two new instruments, including STIS, and perform other tasks during the second HST servicing mission. HST was deployed nearly seven years ago and was initially serviced in 1993.

  17. Portable Fan Assembly for the International Space Station

    NASA Technical Reports Server (NTRS)

    Jenkins, Arthur A.; Roman, Monsi C.

    1999-01-01

    NASA/ Marshall Space Flight Center (NASA/MSFC) is responsible for the design and fabrication of a Portable Fan Assembly (PFA) for the International Space Station (ISS). The PFA will be used to enhance ventilation inside the ISS modules as needed for crew comfort and for rack rotation. The PFA consists of the fan on-orbit replaceable unit (ORU) and two noise suppression packages (silencers). The fan ORU will have a mechanical interface with the Seat Track Equipment Anchor Assembly, in addition to the power supply module which includes a DC-DC converter, on/standby switch, speed control, power cable and connector. This paper provides a brief development history, including the criteria used for the fan, and a detailed description of the PFA operational configurations. Space Station requirements as well as fan performance characteristics are also discussed.

  18. International Space Station Lithium-Ion Battery

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; Schwanbeck, Eugene; North, Tim; Balcer, Sonia

    2016-01-01

    The International Space Station (ISS) primary Electric Power System (EPS) currently uses Nickel-Hydrogen (Ni-H2) batteries to store electrical energy. The electricity for the space station is generated by its solar arrays, which charge batteries during insolation for subsequent discharge during eclipse. The Ni-H2 batteries are designed to operate at a 35 depth of discharge (DOD) maximum during normal operation in a Low Earth Orbit. Since the oldest of the 48 Ni-H2 battery Orbital Replacement Units (ORUs) has been cycling since September 2006, these batteries are now approaching their end of useful life. In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the Ni-H2 batteries and concurrently funded a Li-Ion ORU and cell life testing project. When deployed, they will be the largest Li-Ion batteries ever utilized for a human-rated spacecraft. This paper will include an overview of the ISS Li-Ion battery system architecture, the Li-Ion battery design and development, controls to limit potential hazards from the batteries, and the status of the Li-Ion cell and ORU life cycle testing.

  19. Wear-Out Sensitivity Analysis Project Abstract

    NASA Technical Reports Server (NTRS)

    Harris, Adam

    2015-01-01

    During the course of the Summer 2015 internship session, I worked in the Reliability and Maintainability group of the ISS Safety and Mission Assurance department. My project was a statistical analysis of how sensitive ORU's (Orbital Replacement Units) are to a reliability parameter called the wear-out characteristic. The intended goal of this was to determine a worst case scenario of how many spares would be needed if multiple systems started exhibiting wear-out characteristics simultaneously. The goal was also to determine which parts would be most likely to do so. In order to do this, my duties were to take historical data of operational times and failure times of these ORU's and use them to build predictive models of failure using probability distribution functions, mainly the Weibull distribution. Then, I ran Monte Carlo Simulations to see how an entire population of these components would perform. From here, my final duty was to vary the wear-out characteristic from the intrinsic value, to extremely high wear-out values and determine how much the probability of sufficiency of the population would shift. This was done for around 30 different ORU populations on board the ISS.

  20. Pump and Flow Control Subassembly of Thermal Control Subsystem for Photovoltaic Power Module

    NASA Technical Reports Server (NTRS)

    Motil, Brian; Santen, Mark A.

    1993-01-01

    The pump and flow control subassembly (PFCS) is an orbital replacement unit (ORU) on the Space Station Freedom photovoltaic power module (PVM). The PFCS pumps liquid ammonia at a constant rate of approximately 1170 kg/hr while providing temperature control by flow regulation between the radiator and the bypass loop. Also, housed within the ORU is an accumulator to compensate for fluid volumetric changes as well as the electronics and firmware for monitoring and control of the photovoltaic thermal control system (PVTCS). Major electronic functions include signal conditioning, data interfacing and motor control. This paper will provide a description of each major component within the PFCS along with performance test data. In addition, this paper will discuss the flow control algorithm and describe how the nickel hydrogen batteries and associated power electronics will be thermally controlled through regulation of coolant flow to the radiator.

  1. Charge retention test experiences on Hubble Space Telescope nickel-hydrogen battery cells

    NASA Technical Reports Server (NTRS)

    Nawrocki, Dave E.; Driscoll, J. R.; Armantrout, J. D.; Baker, R. C.; Wajsgras, H.

    1993-01-01

    The Hubble Space Telescope (HST) nickel-hydrogen battery module was designed by Lockheed Missile & Space Co (LMSC) and manufactured by Eagle-Picher Ind. (EPI) for the Marshall Space Flight Center (MSFC) as an Orbital Replacement Unit (ORU) for the nickel-cadmium batteries originally selected for this low earth orbit mission. The design features of the HST nickel hydrogen battery are described and the results of an extended charge retention test are summarized.

  2. Design, Development, and Integration of A Space Shuttle Orbiter Bay 13 Payload Carrier

    NASA Technical Reports Server (NTRS)

    Spencer, Susan H.; Phillips, Michael W.; Upton, Lanny (Technical Monitor)

    2002-01-01

    Bay 13 of the Space Shuttle Orbiter has been limited to small sidewall mounted payloads and ballast. In order to efficiently utilize this space, a concept was developed for a cross-bay cargo carrier to mount Orbital Replacement Units (ORU's) for delivery to the International Space Station and provide additional opportunities for science payloads, while meeting the Orbiter ballast requirements. The Lightweight Multi-Purpose Experiment Support Structure (MPESS) Carrie (LMC) was developed and tested by NASA's Marshall Space Flight Center and the Boeing Company. The Multi-Purpose Experiment Support Structure (MPESS), which was developed for the Spacelab program was modified, removing the keel structure and relocating the sill trunnions to fit in Bay 13. Without the keel fitting, the LMC required a new and innovative concept for transferring Y loads into the Orbiter structure. Since there is no keel fitting available in the Bay 13 location, the design had to utilize the longeron bridge T-rail to distribute the Y loads. This concept has not previously been used in designing Shuttle payloads. A concept was developed to protect for Launch-On-Need ORU's, while providing opportunities for science payloads. Categories of potential ORU's were defined, and Get-Away Special (GAS) payloads of similar mass properties were provided by NASA's Goddard Space Flight Center. Four GAS payloads were manifest as the baseline configuration, preserving the capability to swap up to two ORU's for the corresponding science payloads, after installation into the Orbiter cargo bay at the pad, prior to closeout. Multiple configurations were considered for the analytical integration, to protect for all defined combinations of ORU's and GAS payloads. The first physical integration of the LMC war performed by Goddard Space Flight Center and Kennedy Space Center at an off-line facility at Kennedy Space Center. This paper will discuss the design challenges, structural testing, analytical and physical integration for the LMC's successful maiden flight on STS-108/ISS UF-1 mission in December 2001.

  3. International Space Station Nickel-Hydrogen Battery Startup and Initial Performance

    NASA Technical Reports Server (NTRS)

    Dalton, Penni; Cohen, Fred; Hajela, Gyan

    2002-01-01

    The Battery Orbital Replacement Unit (ORU) was designed to meet the following requirements: a 6.5-year design life, 38,000 charge/discharge Low Earth Orbit cycles, 81-Amp-hr nameplate capacity, 4 kWh nominal storage capacity, contingency orbit capability, an operating temperature of 5 +/- 5 C standard orbit and 5+5/-10 C contingency orbit, a non-operating temperature of -25 to +30 C, a five-year Mean Time between failure, an on-orbit replacement using ISS robotic interface, and one launch to orbit and one return to ground. The ISS electrical power system is successfully maintaining power for all on-board loads. ISS Eclipse power is currently supplied by six Ni-H2 batteries (12 ORUs), which are operating nominally.

  4. Wrist Camera Orientation for Effective Telerobotic Orbital Replaceable Unit (ORU) Changeout

    NASA Technical Reports Server (NTRS)

    Jones, Sharon Monica; Aldridge, Hal A.; Vazquez, Sixto L.

    1997-01-01

    The Hydraulic Manipulator Testbed (HMTB) is the kinematic replica of the Flight Telerobotic Servicer (FTS). One use of the HMTB is to evaluate advanced control techniques for accomplishing robotic maintenance tasks on board the Space Station. Most maintenance tasks involve the direct manipulation of the robot by a human operator when high-quality visual feedback is important for precise control. An experiment was conducted in the Systems Integration Branch at the Langley Research Center to compare several configurations of the manipulator wrist camera for providing visual feedback during an Orbital Replaceable Unit changeout task. Several variables were considered such as wrist camera angle, camera focal length, target location, lighting. Each study participant performed the maintenance task by using eight combinations of the variables based on a Latin square design. The results of this experiment and conclusions based on data collected are presented.

  5. Contamination control concepts for space station customer servicing

    NASA Technical Reports Server (NTRS)

    Maruya, K. A.; Ryan, L. E.; Rosales, L. A.; Medler, E. H.

    1986-01-01

    The customer servicing operations envisioned for the space station, which include instrument repair, orbital replacement unit (ORU) changeout, and fluid replenishment for free-flying and attached payloads, are expected to create requirements for a unique contamination control subsystem for the customer servicing facility (CSF). Both the core space station and the CSF users present unique requirements/sensitivities, not all of which are currently defined with common criteria. Preliminary results from an assessment of the effects of the CSF-induced contamination environment are reported. Strategies for a comprehensive contamination control approach and a description of specific hardware devices and their applicability are discussed.

  6. Large ORU/ Crane evaluations conducted during first EVA of STS-87 (DTO 671)

    NASA Image and Video Library

    1997-11-25

    STS087-718-069 (19 November ? 5 December 1997) --- On the Space Shuttle Columbia's first ever spacewalk (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time this trip of Columbia. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future spacewalkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations, long ago manifest for this mission, after completing a contingency spacewalk to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).

  7. RENEW v3.2 user's manual, maintenance estimation simulation for Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Bream, Bruce L.

    1993-01-01

    RENEW is a maintenance event estimation simulation program developed in support of the Space Station Freedom Program (SSFP). This simulation uses reliability and maintainability (R&M) and logistics data to estimate both average and time dependent maintenance demands. The simulation uses Monte Carlo techniques to generate failure and repair times as a function of the R&M and logistics parameters. The estimates are generated for a single type of orbital replacement unit (ORU). The simulation has been in use by the SSFP Work Package 4 prime contractor, Rocketdyne, since January 1991. The RENEW simulation gives closer estimates of performance since it uses a time dependent approach and depicts more factors affecting ORU failure and repair than steady state average calculations. RENEW gives both average and time dependent demand values. Graphs of failures over the mission period and yearly failure occurrences are generated. The averages demand rate for the ORU over the mission period is also calculated. While RENEW displays the results in graphs, the results are also available in a data file for further use by spreadsheets or other programs. The process of using RENEW starts with keyboard entry of the R&M and operational data. Once entered, the data may be saved in a data file for later retrieval. The parameters may be viewed and changed after entry using RENEW. The simulation program runs the number of Monte Carlo simulations requested by the operator. Plots and tables of the results can be viewed on the screen or sent to a printer. The results of the simulation are saved along with the input data. Help screens are provided with each menu and data entry screen.

  8. Computer-generated scenes depicting the HST capture and EVA repair mission

    NASA Image and Video Library

    1993-11-12

    Computer generated scenes depicting the Hubble Space Telescope capture and a sequence of planned events on the planned extravehicular activity (EVA). Scenes include the Remote Manipulator System (RMS) arm assisting two astronauts changing out the Wide Field/Planetary Camera (WF/PC) (48699); RMS arm assisting in the temporary mating of the orbiting telescope to the flight support system in Endeavour's cargo bay (48700); Endeavour's RMS arm assisting in the "capture" of the orbiting telescope (48701); Two astronauts changing out the telescope's coprocessor (48702); RMS arm assistign two astronauts replacing one of the telescope's electronic control units (48703); RMS assisting two astronauts replacing the fuse plugs on the telescope's Power Distribution Unit (PDU) (48704); The telescope's High Resolution Spectrograph (HRS) kit is depicted in this scene (48705); Two astronauts during the removal of the high speed photometer and the installation of the COSTAR instrument (48706); Two astronauts, standing on the RMS, during installation of one of the Magnetic Sensing System (MSS) (48707); High angle view of the orbiting Space Shuttle Endeavour with its cargo bay doors open, revealing the bay's pre-capture configuration. Seen are, from the left, the Solar Array Carrier, the ORU Carrier and the flight support system (48708); Two astronauts performing the replacement of HST's Rate Sensor Units (RSU) (48709); The RMS arm assisting two astronauts with the replacement of the telescope's solar array panels (48710); Two astronauts replacing the telescope's Solar Array Drive Electronics (SADE) (48711).

  9. Challenges of Sustaining the International Space Station through 2020 and Beyond: Including Epistemic Uncertainty in Reassessing Confidence Targets

    NASA Technical Reports Server (NTRS)

    Anderson, Leif; Carter-Journet, Katrina; Box, Neil; DiFilippo, Denise; Harrington, Sean; Jackson, David; Lutomski, Michael

    2012-01-01

    This paper introduces an analytical approach, Probability and Confidence Trade-space (PACT), which can be used to assess uncertainty in International Space Station (ISS) hardware sparing necessary to extend the life of the vehicle. There are several key areas under consideration in this research. We investigate what sparing confidence targets may be reasonable to ensure vehicle survivability and for completion of science on the ISS. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. An ongoing annual analysis currently compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies availability does not meet subsystem confidence targets, the current sparing analysis further identifies which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty (uncertainty in the knowledge of the true hardware failure rate), which does not currently factor into the annual sparing analysis. The existing confidence targets may be conservative. This paper will also discuss how confidence targets may be relaxed based on the inclusion of epistemic uncertainty for each ORU. The paper will conclude with strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life, 2020 and beyond.

  10. Large ORU/ Crane evaluations conducted during first EVA of STS-87 (DTO 671)

    NASA Image and Video Library

    1997-11-25

    STS087-718-073 (19 November ? 5 December 1997) --- On the Space Shuttle Columbia's first ever spacewalk (EVA), astronaut Winston E. Scott works with a simulated battery and 156-pound crane carried onboard for the first time this trip of Columbia. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the ISS. This crane device is designed to aid future spacewalkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier, astronauts Takao Doi (at the base of the crane, out of frame at right), an international mission specialist representing Japan, and Winston E. Scott had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations, long ago manifest for this mission, after completing a contingency spacewalk to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).

  11. Some issues related to simulation of the tracking and communications computer network

    NASA Technical Reports Server (NTRS)

    Lacovara, Robert C.

    1989-01-01

    The Communications Performance and Integration branch of the Tracking and Communications Division has an ongoing involvement in the simulation of its flight hardware for Space Station Freedom. Specifically, the communication process between central processor(s) and orbital replaceable units (ORU's) is simulated with varying degrees of fidelity. The results of investigations into three aspects of this simulation effort are given. The most general area involves the use of computer assisted software engineering (CASE) tools for this particular simulation. The second area of interest is simulation methods for systems of mixed hardware and software. The final area investigated is the application of simulation methods to one of the proposed computer network protocols for space station, specifically IEEE 802.4.

  12. Some issues related to simulation of the tracking and communications computer network

    NASA Astrophysics Data System (ADS)

    Lacovara, Robert C.

    1989-12-01

    The Communications Performance and Integration branch of the Tracking and Communications Division has an ongoing involvement in the simulation of its flight hardware for Space Station Freedom. Specifically, the communication process between central processor(s) and orbital replaceable units (ORU's) is simulated with varying degrees of fidelity. The results of investigations into three aspects of this simulation effort are given. The most general area involves the use of computer assisted software engineering (CASE) tools for this particular simulation. The second area of interest is simulation methods for systems of mixed hardware and software. The final area investigated is the application of simulation methods to one of the proposed computer network protocols for space station, specifically IEEE 802.4.

  13. EVA/ORU model architecture using RAMCOST

    NASA Technical Reports Server (NTRS)

    Ntuen, Celestine A.; Park, Eui H.; Wang, Y. M.; Bretoi, R.

    1990-01-01

    A parametrically driven simulation model is presented in order to provide a detailed insight into the effects of various input parameters in the life testing of a modular space suit. The RAMCOST model employed is a user-oriented simulation model for studying the life-cycle costs of designs under conditions of uncertainty. The results obtained from the EVA simulated model are used to assess various mission life testing parameters such as the number of joint motions per EVA cycle time, part availability, and number of inspection requirements. RAMCOST first simulates EVA completion for NASA application using a probabilistic like PERT network. With the mission time heuristically determined, RAMCOST then models different orbital replacement unit policies with special application to the astronaut's space suit functional designs.

  14. International Space Station Major Constituent Analyzer On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Phillip M.; Thoresen, Souzan; Wiedemann, Rachel; Matty, Chris

    2015-01-01

    The Major Constituent Analyzer is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic change-out, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. Improvements to ion pump operation and ion source tuning have improved lifetime performance of the current ORU 02 design. The most recent ORU 02 analyzer assemblies, as well as ORU 08, have operated nominally. For ORU 02, the ion source filaments and ion pump lifetime continue to be key determinants of MCA performance and logistical support. Monitoring several key parameters provides the capacity to monitor ORU health and properly anticipate end of life.

  15. International Space Station (ISS) Carbon Dioxide Removal Assembly (CDRA) Desiccant/Adsorbent Bed (DAB) Orbital Replacement Unit (ORU) Redesign

    NASA Technical Reports Server (NTRS)

    Reysa, Richard P.; Lumpkin, John P.; Sherif, Dian El; Kay, Robert; Williams, David E.

    2007-01-01

    The Carbon Dioxide Removal Assembly (CDRA) is a part of the International Space Station (ISS) Environmental Control and Life Support (ECLS) system. The CDRA provides carbon dioxide (CO2) removal from the ISS on-orbit modules. Currently, the CDRA is the secondary removal system on the ISS, with the primary system being the Russian Vozdukh. Within the CDRA are two desiccant/adsorbent beds (DAB), which perform the carbon dioxide removal function. The DAB adsorbent containment approach required improvements with respect to adsorbent containment. These improvements were implemented through a redesign program and have been implemented on units returning from orbit. This paper presents a DAB design modification implementation description, a hardware performance comparison between the unmodified and modified DAB configurations, and a description of the modified DAB hardware implementation into the on-orbit CDRA.

  16. The International Space Station Comparative Maintenance Analysis(CMAM)

    DTIC Science & Technology

    2004-09-01

    External Component • Entire ORU Database 2. Database Connectivity The CMAM ORU database consists of three tables: an ORU master parts list , an ISS...Flight table, and an ISS Subsystem table. The ORU master parts list and the ISS Flight table can be updated or modified from the CMAM user interface

  17. International Space Station Major Constituent Analyzer On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Phillip M.; Cougar, Tamara; Ulrich, BettyLynn

    2017-01-01

    The Major Constituent Analyzer (MCA) is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic change-out, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. The most recent ORU 02 and ORU 08 assemblies in the LAB MCA are operating nominally. For ORU 02, the ion source filaments and ion pump lifetime continue to be key determinants of MCA performance. Finally, the Node 3 MCA is being brought to an operational configuration.

  18. Approach to In Situ Component Level Electronics Assembly Repair (CLEAR) for Constellation

    NASA Technical Reports Server (NTRS)

    Struk, Peter M.; Oeftering, Richard C.

    2010-01-01

    Maintenance resupply is a significant issue for long duration space missions. Currently, the International Space Station (ISS) approaches maintenance primarily around replaceable modules called Orbital Replacement Units (ORU). While swapping out ORUs has served the ISS well keeping crew time for maintenance to a minimum, this approach assumes a substantial logistics capacity to provide replacement ORUs and return ORUs to Earth for repair. The ORUs used for ISS require relatively large blocks of replacement hardware even though the actual failed component may be several orders of magnitude smaller. The Component Level Electronics Assembly Repair (CLEAR) task was created to explore electronics repair down to the component level for future space missions. From 2006 to 2009, CLEAR was an activity under the Supportability project of the Exploration Technology Development Program. This paper describes the activities of CLEAR including making a case for component-level electronics repair, examination of current terrestrial repair hardware, and potential repair needs. Based on those needs, the CLEAR team proposes an architecture for an in-situ repair capability aboard a spacecraft or habitat. Additionally, this paper discusses recent progress toward developing in-space repair capabilities--including two spaceflight experiments-- and presents technology concepts which could help enable or benefit the same.

  19. International Space Station Major Constituent Analyzer On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Phillip M.; Thoresen, Souzan; Granahan, John; Matty, Chris

    2012-01-01

    The Major Constituent Analyzer is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic changeout, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. Over the past two years, two ORU 02 analyzer assemblies have operated nominally while two others have experienced premature on-orbit failures. These failures as well as nominal performances demonstrate that ORU 02 performance remains a key determinant of MCA performance and logistical support. It can be shown that monitoring several key parameters can maximize the capacity to monitor ORU health and properly anticipate end of life. Improvements to ion pump operation and ion source tuning are expected to improve lifetime performance of the current ORU 02 design.

  20. International Space Station Major Constituent Analyzer On-orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Phillip M.; Wiedemann, Rachel; Matty, Chris

    2016-01-01

    The Major Constituent Analyzer (MCA) is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. A number of limited-life components require periodic change-out, including the ORU 02 analyzer and the ORU 08 Verification Gas Assembly. The most recent ORU 02 and ORU 08 assemblies are operating nominally. For ORU 02, the ion source filaments and ion pump lifetime continue to be key determinants of MCA performance. Additionally, testing is underway to evaluate the capacity of the MCA to analyze ammonia. Finally, plans are being made to bring the second MCA on ISS to an operational configuration.

  1. Sensitivity study of Space Station Freedom operations cost and selected user resources

    NASA Technical Reports Server (NTRS)

    Accola, Anne; Fincannon, H. J.; Williams, Gregory J.; Meier, R. Timothy

    1990-01-01

    The results of sensitivity studies performed to estimate probable ranges for four key Space Station parameters using the Space Station Freedom's Model for Estimating Space Station Operations Cost (MESSOC) are discussed. The variables examined are grouped into five main categories: logistics, crew, design, space transportation system, and training. The modification of these variables implies programmatic decisions in areas such as orbital replacement unit (ORU) design, investment in repair capabilities, and crew operations policies. The model utilizes a wide range of algorithms and an extensive trial logistics data base to represent Space Station operations. The trial logistics data base consists largely of a collection of the ORUs that comprise the mature station, and their characteristics based on current engineering understanding of the Space Station. A nondimensional approach is used to examine the relative importance of variables on parameters.

  2. Repair-level analysis for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Chadwick, M.; Yaniec, J.

    1992-01-01

    To assign repair or discard-at-failure designations for orbital replacement units (ORUs) used on Space Station Freedom Electric Power System (SSFEPS), new algorithms and methods were required. Unique parameters, such as upmass costs, extravehicular activity costs and intravehicular activity (IVA) costs specific to Space Station Freedom's maintenance concept were incorporated into the Repair-Level Analysis (RLA). Additional outputs were also required of the SSFEPS RLA that were not required of previous RLAs. These outputs included recommendations for the number of launches that an ORU should be capable of attaining and an economic basis for condemnation rate. These unique parameters were not addressable using existing RLA models: therefore, a new approach was developed. In addition, it was found that preemptive analysis could be performed using spreadsheet-based Boolean expressions to represent the logical condition of the items under analysis.

  3. Life Support for Deep Space and Mars

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.; Hodgson, Edward W.; Kliss, Mark H.

    2014-01-01

    How should life support for deep space be developed? The International Space Station (ISS) life support system is the operational result of many decades of research and development. Long duration deep space missions such as Mars have been expected to use matured and upgraded versions of ISS life support. Deep space life support must use the knowledge base incorporated in ISS but it must also meet much more difficult requirements. The primary new requirement is that life support in deep space must be considerably more reliable than on ISS or anywhere in the Earth-Moon system, where emergency resupply and a quick return are possible. Due to the great distance from Earth and the long duration of deep space missions, if life support systems fail, the traditional approaches for emergency supply of oxygen and water, emergency supply of parts, and crew return to Earth or escape to a safe haven are likely infeasible. The Orbital Replacement Unit (ORU) maintenance approach used by ISS is unsuitable for deep space with ORU's as large and complex as those originally provided in ISS designs because it minimizes opportunities for commonality of spares, requires replacement of many functional parts with each failure, and results in substantial launch mass and volume penalties. It has become impractical even for ISS after the shuttle era, resulting in the need for ad hoc repair activity at lower assembly levels with consequent crew time penalties and extended repair timelines. Less complex, more robust technical approaches may be needed to meet the difficult deep space requirements for reliability, maintainability, and reparability. Developing an entirely new life support system would neglect what has been achieved. The suggested approach is use the ISS life support technologies as a platform to build on and to continue to improve ISS subsystems while also developing new subsystems where needed to meet deep space requirements.

  4. In-Flight Manual Electronics Repair for Deep-Space Missions

    NASA Technical Reports Server (NTRS)

    Pettegrew, Richard; Easton, John; Struk, Peter; Anderson, Eric

    2007-01-01

    Severe limitations on mass and volume available for spares on long-duration spaceflight missions will require electronics repair to be conducted at the component level, rather than at the sub-assembly level (referred to as Orbital Replacement Unit, or 'ORU'), as is currently the case aboard the International Space Station. Performing reliable component-level repairs in a reduced gravity environment by crew members will require careful planning, and some specialty tools and systems. Additionally, spacecraft systems must be designed to enable such repairs. This paper is an overview of a NASA project which examines all of these aspects of component level electronic repair. Results of case studies that detail how NASA, the U.S. Navy, and a commercial company currently approach electronics repair are presented, along with results of a trade study examining commercial technologies and solutions which may be used in future applications. Initial design recommendations resulting from these studies are also presented.

  5. Scott and Doi conduct tool evaluations during second EVA of STS-87

    NASA Image and Video Library

    1997-12-03

    STS087-341-036 (3 Dec. 1997) --- Backdropped against a dark Earth and a light blue horizon, astronaut Takao Doi (right), international mission specialist representing Japan's National Space Development Agency (NASDA), works with a crane while astronaut Winston E. Scott looks on. This second extravehicular activity (EVA) of the mission continued the evaluation of techniques and hardware to be used in constructing the International Space Station (ISS). Near Scott can be seen the representation of a small Orbital Replacement Unit (ORU) in the grasp of the 156-pound crane operated by Doi. A similar crane could be used to transport various sized ORU’s from translation carts on the exterior of the ISS to various worksites on the truss structure. This view was captured, on 35mm film, by a crew mate in the shirt sleeve environment of the Space Shuttle Columbia's cabin. The SPARTAN-201 satellite is in its stowed position at frame center.

  6. Scott and Doi conduct tool evaluations during second EVA of STS-87

    NASA Image and Video Library

    1997-12-03

    STS087-341-004 (3 Dec. 1997) --- Backdropped over Africa, Takao Doi, international mission specialist representing Japan’s National Space Development Agency (NASDA), works with a crane device during a second extravehicular activity (EVA) designed to help evaluate techniques and hardware to be used in constructing the International Space Station (ISS). Takao Doi and astronaut Winston E. Scott (out of frame) were involved in the mission's second EVA in the cargo bay of the Earth-orbiting Space Shuttle Columbia. Takao Doi is working with a 156-pound crane designed to aid spacewalkers in transporting Orbital Replacement Units (ORU) from translation carts on the exterior of the ISS to various worksites on the truss structure. The view of Earth below features an inland delta in Mali (frame center). This view is from the east toward the west and was taken with a 35mm camera.

  7. Resiman during Expedition 16/STS-123 EVA 1

    NASA Image and Video Library

    2008-03-14

    ISS016-E-032705 (13/14 March 2008) --- Astronaut Garrett Reisman, Expedition 16 flight engineer, uses a digital camera to expose a photo of his helmet visor during the mission's first scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. Also visible in the reflections in the visor are various components of the station, the docked Space Shuttle Endeavour and a blue and white portion of Earth. During the seven-hour and one-minute spacewalk, Reisman and astronaut Rick Linnehan (out of frame), STS-123 mission specialist, prepared the Japanese logistics module-pressurized section (JLP) for removal from Space Shuttle Endeavour's payload bay; opened the Centerline Berthing Camera System on top of the Harmony module; removed the Passive Common Berthing Mechanism and installed both the Orbital Replacement Unit (ORU) tool change out mechanisms on the Canadian-built Dextre robotic system, the final element of the station's Mobile Servicing System.

  8. Space Station Freedom photovoltaic power module design status

    NASA Technical Reports Server (NTRS)

    Jimenez, Amador P.; Hoberecht, Mark A.

    1989-01-01

    Electric power generation for Space Station Freedom will be provided by four photovoltaic (PV) power modules using silicon solar cells during Phase 1 operation. Each PV power module requires two solar arrays with 32,800 solar cells generating 18.75 kW of dc power for a total of 75 kW. A portion of this power will be stored in nickel-hydrogen batteries for use during eclipse, and the balance will be processed and converted to 20 kHz ac power for distribution to end users through the power management and distribution system. The design incorporates an optimized thermal control system, pointing and tracking provision with the application of gimbals, and the use of orbital replacement units (ORU's) to achieve modularization. Design status of the PV power module, as derived from major trade studies, is discussed at hardware levels ranging from component to system. Details of the design are presented where appropriate.

  9. Using medico-legal data to investigate fatal older road user crash circumstances and risk factors.

    PubMed

    Koppel, Sjaan; Bugeja, Lyndal; Smith, Daisy; Lamb, Ashne; Dwyer, Jeremy; Fitzharris, Michael; Newstead, Stuart; D'Elia, Angelo; Charlton, Judith

    2018-02-17

    This study used medico-legal data to investigate fatal older road user (ORU, aged 65 years and older) crash circumstances and risk factors relating to 4 key components of the Safe System approach (e.g., roads and roadsides, vehicles, road users, and speeds) to identify areas of priority for targeted prevention activity. The Coroners' Court of Victoria's (CCOV) Surveillance Database was searched to identify and describe the frequency and rate per 100,000 population of fatal ORU crashes in the Australian state of Victoria for 2013-2014. Information relating to the deceased ORU, crash characteristics and circumstances, and risk factors was extracted and analyzed. One hundred and thirty-eight unintentional fatal ORU crashes were identified in the CCOV Surveillance Database. Of these fatal ORU crashes, most involved older drivers (44%), followed by older pedestrians (32%), older passengers (17%), older pedal cyclists (4%), older motorcyclists (1%), and older mobility scooter users (1%). The average annual rate of fatal ORU crashes per 100,000 population was 8.1 (95% confidence interval [CI], 6.0-10.2). In terms of the crash characteristics and circumstances, most fatal ORU crashes involved a counterpart (98%), of which the majority were passenger cars (50%) or fixed/stationary objects (25%), including trees (46%) or embankments (23%). In addition, most fatal ORU crashes occurred close to home (73%), on-road (87%), on roads that were paved (94%), on roads with light traffic volume (37%), and during low-risk conditions: between 12 p.m. and 6 p.m. (44%), on weekdays (80%), during daylight (75%), and under dry/clear conditions (81%). Road user (RU) error was identified by the police and/or the coroner for the majority of fatal crashes (55%), with a significant proportion of deceased ORUs deemed to have failed to yield (54%) or misjudged (41%). RU error was the most significant factor identified in fatal ORU crashes, which suggests that there is a limited capacity of the road system to fully accommodate RU errors. Initiatives related to safer roads and roadsides, vehicles, speed zones, as well as behavioral approaches are key areas of priority for targeted activity to prevent fatal ORU crashes in the future.

  10. Mass and Reliability Source (MaRS) Database

    NASA Technical Reports Server (NTRS)

    Valdenegro, Wladimir

    2017-01-01

    The Mass and Reliability Source (MaRS) Database consolidates components mass and reliability data for all Oribital Replacement Units (ORU) on the International Space Station (ISS) into a single database. It was created to help engineers develop a parametric model that relates hardware mass and reliability. MaRS supplies relevant failure data at the lowest possible component level while providing support for risk, reliability, and logistics analysis. Random-failure data is usually linked to the ORU assembly. MaRS uses this data to identify and display the lowest possible component failure level. As seen in Figure 1, the failure point is identified to the lowest level: Component 2.1. This is useful for efficient planning of spare supplies, supporting long duration crewed missions, allowing quicker trade studies, and streamlining diagnostic processes. MaRS is composed of information from various databases: MADS (operating hours), VMDB (indentured part lists), and ISS PART (failure data). This information is organized in Microsoft Excel and accessed through a program made in Microsoft Access (Figure 2). The focus of the Fall 2017 internship tour was to identify the components that were the root cause of failure from the given random-failure data, develop a taxonomy for the database, and attach material headings to the component list. Secondary objectives included verifying the integrity of the data in MaRS, eliminating any part discrepancies, and generating documentation for future reference. Due to the nature of the random-failure data, data mining had to be done manually without the assistance of an automated program to ensure positive identification.

  11. International Space Station Major Constituent Analyzer On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Erwin, Philip M.; Thoresen, Souzan; Granahan, John; Matty, Chris

    2011-01-01

    The Major Constituent Analyzer (MCA) is an integral part of the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). The MCA is a mass spectrometer-based instrument designed to provide critical monitoring of six major atmospheric constituents; nitrogen, oxygen, hydrogen, carbon dioxide, methane, and water vapor. These gases are sampled continuously and automatically in all United States On-Orbit Segment (USOS) modules via the Sample Distribution System (SDS). The MCA is the primary tool for management of atmosphere constituents and is therefore critical for ensuring a habitable ISS environment during both nominal ISS operations and campout EVA preparation in the Airlock. The MCA has been in operation in the US Destiny Laboratory Module for over 10 years, and a second MCA has been delivered to the ISS for Node 3 operation. This paper discusses the performance of the MCA over the two past year, with particular attention to lessons learned regarding the operational life of critical components. Recent data have helped drive design upgrades for a new set of orbit-replaceable units (ORUs) currently in production. Several ORU upgrades are expected to increase expected lifetimes and reliability.

  12. Derivation of Failure Rates and Probability of Failures for the International Space Station Probabilistic Risk Assessment Study

    NASA Technical Reports Server (NTRS)

    Vitali, Roberto; Lutomski, Michael G.

    2004-01-01

    National Aeronautics and Space Administration s (NASA) International Space Station (ISS) Program uses Probabilistic Risk Assessment (PRA) as part of its Continuous Risk Management Process. It is used as a decision and management support tool to not only quantify risk for specific conditions, but more importantly comparing different operational and management options to determine the lowest risk option and provide rationale for management decisions. This paper presents the derivation of the probability distributions used to quantify the failure rates and the probability of failures of the basic events employed in the PRA model of the ISS. The paper will show how a Bayesian approach was used with different sources of data including the actual ISS on orbit failures to enhance the confidence in results of the PRA. As time progresses and more meaningful data is gathered from on orbit failures, an increasingly accurate failure rate probability distribution for the basic events of the ISS PRA model can be obtained. The ISS PRA has been developed by mapping the ISS critical systems such as propulsion, thermal control, or power generation into event sequences diagrams and fault trees. The lowest level of indenture of the fault trees was the orbital replacement units (ORU). The ORU level was chosen consistently with the level of statistically meaningful data that could be obtained from the aerospace industry and from the experts in the field. For example, data was gathered for the solenoid valves present in the propulsion system of the ISS. However valves themselves are composed of parts and the individual failure of these parts was not accounted for in the PRA model. In other words the failure of a spring within a valve was considered a failure of the valve itself.

  13. Servicing capability for the evolutionary Space Station

    NASA Technical Reports Server (NTRS)

    Thomas, Edward F.; Grems, Edward G., III; Corbo, James E.

    1990-01-01

    Since the beginning of the Space Station Freedom (SSF) program the concept of on-orbit servicing of user hardware has been an integral part of the program implementation. The user servicing system architecture has been divided into a baseline and a growth phase. The baseline system consists of the following hardware elements that will support user servicing - flight telerobotic servicer, crew and equipment translation aid, crew intravehicular and extravehicular servicing support, logistics supply system, mobile servicing center, and the special purpose dextrous manipulator. The growth phase incorporates a customer servicing facility (CSF), a station-based orbital maneuvering vehicle and an orbital spacecraft consumables resupply system. The requirements for user servicing were derived from the necessity to service attached payloads, free flyers and coorbiting platforms. These requirements include: orbital replacement units (ORU) and instrument changeout, National Space Transportation System cargo bay loading and unloading, contamination control and monitoring, thermal protection, payload berthing, storage, access to SSF distributed systems, functional checkout, and fluid replenishment. The baseline user servicing capabilities accommodate ORU and instrument changeout. However, this service is limited to attached payloads, either in situ or at a locally adjacent site. The growth phase satisfies all identified user servicing requirements by expanding servicing capabilities to include complex servicing tasks for attached payloads, free-flyers and coorbiting platforms at a dedicated, protected Servicing site. To provide a smooth evolution of user servicing the SSF interfaces that are necessary to accommodate the growth phase have been identified. The interface requirements on SSF have been greatly simplified by accommodating the growth servicing support elements within the CSF. This results in a single SSF interface: SSF to the CSF.

  14. Understanding fatal older road user crash circumstances and risk factors.

    PubMed

    Koppel, Sjaan; Bugeja, Lyndal; Smith, Daisy; Lamb, Ashne; Dwyer, Jeremy; Fitzharris, Michael; Newstead, Stuart; D'Elia, Angelo; Charlton, Judith

    2018-02-28

    This study used medicolegal data to investigate fatal older road user (ORU) crash circumstances and risk factors relating to four key components of the Safe System approach (e.g., roads and roadsides, vehicles, road users, and speeds) to identify areas of priority for targeted prevention activity. The Coroners Court of Victoria's Surveillance Database was searched to identify coronial records with at least one deceased ORU in the state of Victoria, Australia, for 2013-2014. Information relating to the ORU, crash characteristics and circumstances, and risk factors was extracted and analyzed. The average rate of fatal ORU crashes per 100,000 population was 8.1 (95% confidence interval [CI] 6.0-10.2), which was more than double the average rate of fatal middle-aged road user crashes (3.6, 95% CI 2.5-4.6). There was a significant relationship between age group and deceased road user type (χ 2 (15, N = 226) = 3.56, p < 0.001). The proportion of deceased drivers decreased with age, whereas the proportion of deceased pedestrians increased with age. The majority of fatal ORU crashes involved a counterpart (another vehicle: 59.4%; fixed/stationary object: 25.4%), and occurred "on road" (87.0%), on roads that were paved (94.2%), dry (74.2%), and had light traffic volume (38.3%). Road user error was identified by the police and/or coroner for the majority of fatal ORU crashes (57.9%), with a significant proportion of deceased ORU deemed to have "misjudged" (40.9%) or "failed to yield" (37.9%). Road user error was the most significant risk factor identified in fatal ORU crashes, which suggests that there is a limited capacity of the Victorian road system to fully accommodate road user errors. Initiatives related to safer roads and roadsides, vehicles, and speed zones, as well as behavioral approaches, are key areas of priority for targeted activity to prevent fatal older road user crashes in the future.

  15. Onboard photo: Astronauts at work

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Onboard Space Shuttle Columbia's (STS-87) first ever Extravehicular Activity (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future space walkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott, mission specialist, had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations after completing a contingency EVA to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).

  16. Space Shuttle Project

    NASA Image and Video Library

    1997-11-19

    Onboard Space Shuttle Columbia's (STS-87) first ever Extravehicular Activity (EVA), astronaut Takao Doi works with a 156-pound crane carried onboard for the first time. The crane's inclusion and the work with it are part of a continuing preparation effort for future work on the International Space Station (ISS). The ongoing project allows for evaluation of tools and operating methods to be applied to the construction of the Space Station. This crane device is designed to aid future space walkers in transporting Orbital Replacement Units (ORU), with a mass up to 600 pounds (like the simulated battery pictured here), from translating carts on the exterior of ISS to various worksites on the truss structure. Earlier Doi, an international mission specialist representing Japan, and astronaut Winston E. Scott, mission specialist, had installed the crane in a socket along the middle port side of Columbia's cargo bay for the evaluation. The two began the crane operations after completing a contingency EVA to snag the free-flying Spartan 201 and berth it in the payload bay (visible in the background).

  17. International Space Station Active Thermal Control Sub-System On-Orbit Pump Performance and Reliability Using Liquid Ammonia as a Coolant

    NASA Technical Reports Server (NTRS)

    Morton, Richard D.; Jurick, Matthew; Roman, Ruben; Adamson, Gary; Bui, Chinh T.; Laliberte, Yvon J.

    2011-01-01

    The International Space Station (ISS) contains two Active Thermal Control Sub-systems (ATCS) that function by using a liquid ammonia cooling system collecting waste heat and rejecting it using radiators. These subsystems consist of a number of heat exchangers, cold plates, radiators, the Pump and Flow Control Subassembly (PFCS), and the Pump Module (PM), all of which are Orbital Replaceable Units (ORU's). The PFCS provides the motive force to circulate the ammonia coolant in the Photovoltaic Thermal Control Subsystem (PVTCS) and has been in operation since December, 2000. The Pump Module (PM) circulates liquid ammonia coolant within the External Active Thermal Control Subsystem (EATCS) cooling the ISS internal coolant (water) loops collecting waste heat and rejecting it through the ISS radiators. These PM loops have been in operation since December, 2006. This paper will discuss the original reliability analysis approach of the PFCS and Pump Module, comparing them against the current operational performance data for the ISS External Thermal Control Loops.

  18. Update on International Space Station Nickel-Hydrogen Battery On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Dalton, Penni; Cohen, Fred

    2003-01-01

    International Space Station (ISS) Electric Power System (EPS) utilizes Nickel-Hydrogen (Ni-H2) batteries as part of its power system to store electrical energy. The batteries are charged during insolation and discharged during eclipse. The batteries are designed to operate at a 35% depth of discharge (DOD) maximum during normal operation. Thirty-eight individual pressure vessel (IPV) Ni-H2 battery cells are series-connected and packaged in an Orbital Replacement Unit (ORU). Two ORUs are series-connected utilizing a total of 76 cells, to form one battery. The ISS is the first application for low earth orbit (LEO) cycling of this quantity of series-connected cells. The P6 (Port) Integrated Equipment Assembly (IEA) containing the initial ISS high-power components was successfully launched on November 30, 2000. The IEA contains 12 Battery Subassembly ORUs (6 batteries) that provide station power during eclipse periods. This paper will discuss the battery performance data after two and a half years of cycling.

  19. International Space Station Nickel-Hydrogen Battery On-Orbit Performance

    NASA Technical Reports Server (NTRS)

    Dalton, Penni; Cohen, Fred

    2002-01-01

    International Space Station (ISS) Electric Power System (EPS) utilizes Nickel-Hydrogen (Ni-H2) batteries as part of its power system to store electrical energy. The batteries are charged during insolation and discharged during eclipse. The batteries are designed to operate at a 35 percent depth of discharge (DOD) maximum during normal operation. Thirty-eight individual pressure vessel (IPV) Ni-H2 battery cells are series-connected and packaged in an Orbital Replacement Unit (ORU). Two ORUs are series-connected utilizing a total of 76 cells to form one battery. The ISS is the first application for low earth orbit (LEO) cycling of this quantity of series-connected cells. The P6 (Port) Integrated Equipment Assembly (IEA) containing the initial ISS high-power components was successfully launched on November 30, 2000. The IEA contains 12 Battery Subassembly ORUs (6 batteries) that provide station power during eclipse periods. This paper will discuss the battery performance data after eighteen months of cycling.

  20. Ogun Oru: a traditional explanation for nocturnal neuropsychiatric disturbances among the Yoruba of Southwest Nigeria.

    PubMed

    Aina, O F; Famuyiwa, O O

    2007-03-01

    This article describes three cases of ;ogun oru' (nocturnal warefare), a condition reported in southwest Nigeria involving an acute night-time disturbance that is culturally attributed to demonic infiltration of the body and psyche during dreaming. Ogun oru is characterized by its occurrence, a female preponderance, the perception of an underlying feud between the sufferer's earthly spouse and a ;spiritual' spouse, and the event of bewitchment through eating while dreaming. The condition is believed to be treatable through Christian prayers or elaborate traditional rituals designed to exorcise the imbibed demonic elements. Ogun oru may be a label applied to medical problems. The differential diagnosis includes mainly parasomnias, for example, sleep terror, sleepwalking and sleep paralysis and, to a lesser extent, nocturnal or sleep epilepsy.

  1. STS-103 Crew Training

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The Hubble Space Telescope (HST) team is preparing for NASA's third scheduled service call to Hubble. This mission, STS-103, will launch from Kennedy Space Center aboard the Space Shuttle Discovery. The seven flight crew members are Commander Curtis L. Brown, Pilot Scott J. Kelly, European Space Agency (ESA) astronaut Jean-Francois Clervoy who will join space walkers Steven L. Smith, C. Michael Foale, John M. Grunsfeld, and ESA astronaut Claude Nicollier. The objectives of the HST Third Servicing Mission (SM3A) are to replace the telescope's six gyroscopes, a Fine-Guidance Sensor, an S-Band Single Access Transmitter, a spare solid-state recorder and a high-voltage/temperature kit for protecting the batteries from overheating. In addition, the crew plans to install an advanced computer that is 20 times faster and has six times the memory of the current Hubble Space Telescope computer. To prepare for these extravehicular activities (EVAs), the SM3A astronauts participated in Crew Familiarization sessions with the actual SM3A flight hardware. During these sessions the crew spent long hours rehearsing their space walks in the Guidance Navigation Simulator and NBL (Neutral Buoyancy Laboratory). Using space gloves, flight Space Support Equipment (SSE), and Crew Aids and Tools (CATs), the astronauts trained with and verified flight orbital replacement unit (ORU) hardware. The crew worked with a number of trainers and simulators, such as the High Fidelity Mechanical Simulator, Guidance Navigation Simulator, System Engineering Simulator, the Aft Shroud Door Trainer, the Forward Shell/Light Shield Simulator, and the Support Systems Module Bay Doors Simulator. They also trained and verified the flight Orbital Replacement Unit Carrier (ORUC) and its ancillary hardware. Discovery's planned 10-day flight is scheduled to end with a night landing at Kennedy.

  2. Challenges of Sustaining the International Space Station Through 2020 and Beyond: Reassessing Confidence Targets for System Availability

    NASA Technical Reports Server (NTRS)

    Lutomski, Michael G.; Carter-Journet, Katrina; Anderson, Leif; Box, Neil; Harrington, Sean; Jackson, David; DiFilippo, Denise

    2012-01-01

    The International Space Station (ISS) was originally designed to operate until 2015 with a plan for deorbiting the ISS in 2016. Currently, the international partnership has agreed to extend the operations until 2020 and discussions are underway to extend the life even further to 2028. Each partner is responsible for the sustaining engineering, sparing, and maintenance of their own segments. National Aeronautics and Space Administration's (NASA's) challenge is to purchase the needed number of spares to maintain the functional availability of the ISS systems necessary for the United States On-Orbit Segment s contribution. This presentation introduces an analytical approach to assessing uncertainty in ISS hardware necessary to extend the life of the vehicle. Some key areas for consideration are: establishing what confidence targets are required to ensure science can be continuously carried out on the ISS, defining what confidence targets are reasonable to ensure vehicle survivability, considering what is required to determine if the confidence targets are too high, and whether sufficient number of spares are purchased. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. This analysis compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies' availability does not meet subsystem confidence targets, the analysis will further identify which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty which must be factored into the development and execution of sparing risk postures. In addition, it is also recognized that uncertainty in the assessment is due to disconnects between modeled functions and actual subsystem operations. Perhaps most importantly, it is acknowledged that conservative confidence targets per subsystem are currently accepted. This presentation will also discuss how subsystem confidence targets may be relaxed based on calculating the level of uncertainty for each corresponding ORU-function. The presentation will conclude with the various strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life; 2020 and beyond.

  3. Investigation of International Space Station Major Constituent Analyzer Anomalous ORU 02 Performance

    NASA Technical Reports Server (NTRS)

    Gardner, Ben D.; Burchfield, David E.; Pargellis, Andrew; Erwin, Phillip M.; Thoresen, Souzan; Gentry, Grey; Granahan, John; Matty, Chris

    2013-01-01

    The Major Constituent Analyzer (MCA) is a mass spectrometer based system that measures the major atmospheric constituents on the International Space Station. In 2011, two MCA ORU 02 analyzer assemblies experienced premature on-orbit failures. These failures were determined to be the result of off-nominal ion source filament performance. Recent product improvements to ORU 02 designed to improve the lifetime of the ion pump also constrained the allowable tuning criteria for the ion source filaments. This presentation describes the filament failures as well as the corrective actions implemented to preclude such failures in the future.

  4. Testing of FTS fingers and interface using a passive compliant robot manipulator. [flight telerobot servicer

    NASA Technical Reports Server (NTRS)

    Nguyen, Charles C.; Antrazi, Sami S.

    1992-01-01

    This report deals with testing of a pair of robot fingers designed for the Flight Telerobotic Servicer (FTS) to grasp a cylinder type of Orbital Replaceable Unit (ORU) interface. The report first describes the objectives of the study and then the testbed consisting of a Stewart Platform-based manipulator equipped with a passive compliant platform which also serves as a force/torque sensor. Kinematic analysis is then performed to provide a closed-form solution for the force inverse kinematics and iterative solution for the force forward kinematics using the Newton's Raphson Method. Mathematical expressions are then derived to compute force/torques applied to the FTS fingers during the mating/demating with the interface. The report then presents the three parts of the experimental study on the feasibility and characteristics of the fingers. The first part obtains data of forces applied by the fingers to the interface under various misalignments, the second part determines the maximum allowable capture angles for mating, and the third part processes and interprets the obtained force/torque data.

  5. Evaluation of telerobotic systems using an instrumented task board

    NASA Technical Reports Server (NTRS)

    Carroll, John D.; Gierow, Paul A.; Bryan, Thomas C.

    1991-01-01

    An instrumented task board was developed at NASA Marshall Space Flight Center (MSFC). An overview of the task board design, and current development status is presented. The task board was originally developed to evaluate operator performance using the Protoflight Manipulator Arm (PFMA) at MSFC. The task board evaluates tasks for Orbital Replacement Unit (ORU), fluid connect and transfers, electrical connect/disconnect, bolt running, and other basic tasks. The instrumented task board measures the 3-D forces and torques placed on the board, determines the robot arm's 3-D position relative to the task board using IR optics, and provides the information in real-time. The PFMA joint input signals can also be measured from a breakout box to evaluate the sensitivity or response of the arm operation to control commands. The data processing system provides the capability for post processing of time-history graphics and plots of the PFMA positions, the operator's actions, and the PFMA servo reactions in addition to real-time force/torque data presentation. The instrumented task board's most promising use is developing benchmarks for NASA centers for comparison and evaluation of telerobotic performance.

  6. Battery Reinitialization of the Photovoltaic Module of the International Space Station

    NASA Technical Reports Server (NTRS)

    Hajela, Gyan; Cohen, Fred; Dalton, Penni

    2002-01-01

    The photovoltaic (PV) module on the International Space Station (ISS) has been operating since November 2000 and supporting electric power demands of the ISS and its crew of three. The PV module contains photovoltaic arrays that convert solar energy to electrical power and an integrated equipment assembly (IEA) that houses electrical hardware and batteries for electric power regulation and storage. Each PV module contains two independent power channels for fault tolerance. Each power channel contains three batteries in parallel to meet its performance requirements and for fault tolerance. Each battery consists of 76 Ni-Hydrogen (Ni-H2) cells in series. These 76 cells are contained in two orbital replaceable units (ORU) that are connected in series. On-orbit data are monitored and trended to ensure that all hardware is operating normally. Review of on-orbit data showed that while five batteries are operating very well, one is showing signs of mismatched ORUs. The cell pressure in the two ORUs differs by an amount that exceeds the recommended range. The reason for this abnormal behavior may be that the two ORUs have different use history. An assessment was performed and it was determined that capacity of this battery would be limited by the lower pressure ORU. Steps are being taken to reduce this pressure differential before battery capacity drops to the point of affecting its ability to meet performance requirements. As a first step, a battery reinitialization procedure was developed to reduce this pressure differential. The procedure was successfully carried out on-orbit and the pressure differential was reduced to the recommended range. This paper describes the battery performance and the consequences of mismatched ORUs that make a battery. The paper also describes the reinitialization procedure, how it was performed on orbit, and battery performance after the reinitialization. On-orbit data monitoring and trending is an ongoing activity and it will continue as ISS assembly progresses.

  7. Exploration Challenges: Transferring Ground Repair Techniques to Space Flight Application

    NASA Technical Reports Server (NTRS)

    McLemore, Carole A.; Kennedy, James P.; Rose, Frederick A.; Evans, Brian W.

    2007-01-01

    Fulfilling NASA's Vision for Space Exploration will demand an extended presence in space at distances from our home planet that exceed our current experience in space logistics and maintenance. The ability to perform repairs in lieu of the customary Orbital Replacement Unit (ORU) process where a faulty part is replaced will be elevated from contingency to routine to sustain operations. The use and cost effectiveness of field repairs for ground based operations in industry and the military have advanced with the development of technology in new materials, new repair techniques and new equipment. The unique environments, accessibility constraints and Extra Vehicular Activity (EVA) issues of space operations will require extensive assessment and evolution of these technologies to provide an equivalent and expected level of assurance to mission success. Challenges include the necessity of changes in design philosophy and policy, extremes in thermal cycling, disruptive forces (such as static charge and wind entrainment) on developed methods for control of materials, dramatically increased volatility of chemicals for cleaning and other compounds due to extremely low pressures, the limits imposed on dexterity and maneuverability by current EVA equipment and practices, and the necessity of unique verification methodology. This paper describes these challenges in and discusses the effects on the established ground techniques for repair. The paper also describes the leading repair methodology candidates and their beneficial attributes for resolving these issues with the evolution of technology.

  8. Hubble Space Telescope: Servicing Mission 3A. Media Reference Guide

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Since its launch in April 1990, the Hubble Space Telescope (HST) has provided scientific data and images of unprecedented resolution from which many new and exciting discoveries have been made. The Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit manned servicing missions. The First Servicing Mission (SM1) took place in December 1993 and the Second Servicing Mission (SM2) was flown in February 1997. During these missions, astronauts perform planned repairs and maintenance activities to restore and upgrade the observatory s capabilities. To facilitate this process, the Telescope s designers configured science instruments and several vital engineering subsystems as Orbital Replacement Units (ORU) -- modular packages with standardized fittings accessible to astronauts in pressurized suits. Hubble's Third Servicing Mission has been separated into two parts: Servicing Mission 3A (SM3A) will fly in Fall of 1999 and Servicing Mission 3B (SM3B) is planned for 2001. The principal objective of SM3A is to replace all six gyroscopes that compose the three Rate Sensor Units (RSU). In addition, space-walking astronauts will install a new Advanced Computer that will dramatically increase the computing power, speed, and storage capability of HST. They will change out one of the Fine Guidance Sensors (FGS) and replace a tape recorder with a new Solid State Recorder (SSR). The Extravehicular Activity (EVA) crew also will install a new S-band Single-Access Transmitter (SSAT), and Voltage/Temperature Improvement Kits (VIK) for the Telescope s nickel-hydrogen batteries. Finally, they will begin repair of the multilayer insulation on Hubble s outer surface. During SM3B astronauts will install a new science instrument, the Advanced Camera for Surveys (ACS), and an Aft Shroud Cooling System (ASCS) for the other axial science instruments. They will attach a new cryogenic cooler to the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS). They also will replace the HST flexible Solar Arrays with new high-performance rigid arrays.

  9. Evaluation of COSTAR mass handling characteristics in an environment. A simulation of the Hubble Space Telescope service mission

    NASA Technical Reports Server (NTRS)

    Rajulu, Sudhakar L.; Klute, Glenn K.; Fletcher, Lauren

    1994-01-01

    The STS-61 Shuttle mission, which took place in December 1993, was solely aimed at servicing the Hubble Space Telescope (HST). Successful completion of this mission was critical to NASA since it was necessary to rectify a flaw in the HST mirror. In addition, NASA had never scheduled a mission with such a high quantity of complex extravehicular activity. To meet the challenge of this mission, the STS-61 crew trained extensively in the Weightless Environment Test Facility at the Johnson Space Center and in the Neutral Buoyancy Simulator at the Marshall Space Flight Center. However, it was suspected that neutral buoyancy training might induce negative training by virtue of the viscous damping effect present in water. The mockups built for this training also did not have the mass properties of the actual orbital replacement units (ORUs). It was felt that the crew should be further trained on mockups with similar mass characteristics. A comprehensive study was designed to address these issues. The study was quantitative, and instrumentation was set up to measure and quantify the forces and moments experienced during ORU mass handling and remote manipulator system run conditions.

  10. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    NASA Technical Reports Server (NTRS)

    Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.

    2012-01-01

    As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.

  11. Comparison of System Identification Techniques for the Hydraulic Manipulator Test Bed (HMTB)

    NASA Technical Reports Server (NTRS)

    Morris, A. Terry

    1996-01-01

    In this thesis linear, dynamic, multivariable state-space models for three joints of the ground-based Hydraulic Manipulator Test Bed (HMTB) are identified. HMTB, housed at the NASA Langley Research Center, is a ground-based version of the Dexterous Orbital Servicing System (DOSS), a representative space station manipulator. The dynamic models of the HMTB manipulator will first be estimated by applying nonparametric identification methods to determine each joint's response characteristics using various input excitations. These excitations include sum of sinusoids, pseudorandom binary sequences (PRBS), bipolar ramping pulses, and chirp input signals. Next, two different parametric system identification techniques will be applied to identify the best dynamical description of the joints. The manipulator is localized about a representative space station orbital replacement unit (ORU) task allowing the use of linear system identification methods. Comparisons, observations, and results of both parametric system identification techniques are discussed. The thesis concludes by proposing a model reference control system to aid in astronaut ground tests. This approach would allow the identified models to mimic on-orbit dynamic characteristics of the actual flight manipulator thus providing astronauts with realistic on-orbit responses to perform space station tasks in a ground-based environment.

  12. Hardware Design Improvements to the Major Constituent Analyzer

    NASA Technical Reports Server (NTRS)

    Combs, Scott; Schwietert, Daniel; Anaya, Marcial; DeWolf, Shannon; Merrill, Dave; Gardner, Ben D.; Thoresen, Souzan; Granahan, John; Belcher, Paul; Matty, Chris

    2011-01-01

    The Major Constituent Analyzer (MCA) onboard the International Space Station (ISS) is designed to monitor the major constituents of the ISS's internal atmosphere. This mass spectrometer based system is an integral part of the Environmental Control and Life Support System (ECLSS) and is a primary tool for the management of ISS atmosphere composition. As a part of NASA Change Request CR10773A, several alterations to the hardware have been made to accommodate improved MCA logistics. First, the ORU 08 verification gas assembly has been modified to allow the verification gas cylinder to be installed on orbit. The verification gas is an essential MCA consumable that requires periodic replenishment. Designing the cylinder for subassembly transport reduces the size and weight of the maintained item for launch. The redesign of the ORU 08 assembly includes a redesigned housing, cylinder mounting apparatus, and pneumatic connection. The second hardware change is a redesigned wiring harness for the ORU 02 analyzer. The ORU 02 electrical connector interface was damaged in a previous on-orbit installation, and this necessitated the development of a temporary fix while a more permanent solution was developed. The new wiring harness design includes flexible cable as well as indexing fasteners and guide-pins, and provides better accessibility during the on-orbit maintenance operation. This presentation will describe the hardware improvements being implemented for MCA as well as the expected improvement to logistics and maintenance.

  13. Conceptual design of the Space Station combustion module

    NASA Technical Reports Server (NTRS)

    Morilak, Daniel P.; Rohn, Dennis W.; Rhatigan, Jennifer L.

    1994-01-01

    The purpose of this paper is to describe the conceptual design of the Combustion Module for the International Space Station Alpha (ISSA). This module is part of the Space Station Fluids/Combustion Facility (SS FCF) under development at the NASA Lewis Research Center. The Fluids/Combustion Facility is one of several science facilities which are being developed to support microgravity science investigations in the US Laboratory Module of the ISSA. The SS FCF will support a multitude of fluids and combustion science investigations over the lifetime of the ISSA and return state-of-the-art science data in a timely and efficient manner to the scientific communities. This will be accomplished through modularization of hardware, with planned, periodic upgrades; modularization of like scientific investigations that make use of common facility functions; and through the use of orbital replacement units (ORU's) for incorporation of new technology and new functionality. The SS FCF is scheduled to become operational on-orbit in 1999. The Combustion Module is presently scheduled for launch to orbit and integration with the Fluids/Combustion Facility in 1999. The objectives of this paper are to describe the history of the Combustion Module concept, the types of combustion science investigations which will be accommodated by the module, the hardware design heritage, the hardware concept, and the hardware breadboarding efforts currently underway.

  14. Conceptual Design of the Space Station Fluids Module

    NASA Technical Reports Server (NTRS)

    Rohn, Dennis W.; Morilak, Daniel P.; Rhatigan, Jennifer L.; Peterson, Todd T.

    1994-01-01

    The purpose of this paper is to describe the conceptual design of the Fluids Module for the International Space Station Alpha (ISSA). This module is part of the Space Station Fluids/Combustion Facility (SS FCF) under development at the NASA Lewis Research Center. The Fluids/Combustion Facility is one of several science facilities which are being developed to support microgravity science investigations in the US Laboratory Module of the ISSA. The SS FCF will support a multitude of fluids and combustion science investigations over the lifetime of the ISSA and return state-of-the-art science data in a timely and efficient manner to the scientific communities. This will be accomplished through modularization of hardware, with planned, periodic upgrades; modularization of like scientific investigations that make use of common facility functions; and use of orbital replacement units (ORU's) for incorporation of new technology and new functionality. Portions of the SS FCF are scheduled to become operational on-orbit in 1999. The Fluids Module is presently scheduled for launch to orbit and integration with the Fluids/Combustion Facility in 2001. The objectives of this paper are to describe the history of the Fluids Module concept, the types of fluids science investigations which will be accommodated by the module, the hardware design heritage, the hardware concept, and the hardware breadboarding efforts currently underway.

  15. Automated and Adaptive Mission Planning for Orbital Express

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel; Koblick, Darin

    2008-01-01

    The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

  16. Identification and functional analysis of flowering related microRNAs in common wild rice (Oryza rufipogon Griff.).

    PubMed

    Chen, Zongxiang; Li, Fuli; Yang, Songnan; Dong, Yibo; Yuan, Qianhua; Wang, Feng; Li, Weimin; Jiang, Ying; Jia, Shirong; Pei, Xinwu

    2013-01-01

    MicroRNAs (miRNAs) is a class of non-coding RNAs involved in post- transcriptional control of gene expression, via degradation and/or translational inhibition. Six-hundred sixty-one rice miRNAs are known that are important in plant development. However, flowering-related miRNAs have not been characterized in Oryza rufipogon Griff. It was approved by supervision department of Guangdong wild rice protection. We analyzed flowering-related miRNAs in O. rufipogon using high-throughput sequencing (deep sequencing) to understand the changes that occurred during rice domestication, and to elucidate their functions in flowering. Three O. rufipogon sRNA libraries, two vegetative stage (CWR-V1 and CWR-V2) and one flowering stage (CWR-F2) were sequenced using Illumina deep sequencing. A total of 20,156,098, 21,531,511 and 20,995,942 high quality sRNA reads were obtained from CWR-V1, CWR-V2 and CWR-F2, respectively, of which 3,448,185, 4,265,048 and 2,833,527 reads matched known miRNAs. We identified 512 known rice miRNAs in 214 miRNA families and predicted 290 new miRNAs. Targeted functional annotation, GO and KEGG pathway analyses predicted that 187 miRNAs regulate expression of flowering-related genes. Differential expression analysis of flowering-related miRNAs showed that: expression of 95 miRNAs varied significantly between the libraries, 66 are flowering-related miRNAs, such as oru-miR97, oru-miR117, oru-miR135, oru-miR137, et al. 17 are early-flowering -related miRNAs, including osa-miR160f, osa-miR164d, osa-miR167d, osa-miR169a, osa-miR172b, oru-miR4, et al., induced during the floral transition. Real-time PCR revealed the same expression patterns as deep sequencing. miRNAs targets were confirmed for cleavage by 5'-RACE in vivo, and were negatively regulated by miRNAs. This is the first investigation of flowering miRNAs in wild rice. The result indicates that variation in miRNAs occurred during rice domestication and lays a foundation for further study of phase change and flowering in O. rufipogon. Complicated regulatory networks mediated by multiple miRNAs regulate the expression of flowering genes that control the induction of flowering.

  17. Telerobotic rendezvous and docking vision system architecture

    NASA Technical Reports Server (NTRS)

    Gravely, Ben; Myers, Donald; Moody, David

    1992-01-01

    This research program has successfully demonstrated a new target label architecture that allows a microcomputer to determine the position, orientation, and identity of an object. It contains a CAD-like database with specific geometric information about the object for approach, grasping, and docking maneuvers. Successful demonstrations were performed selecting and docking an ORU box with either of two ORU receptacles. Small, but significant differences were seen in the two camera types used in the program, and camera sensitive program elements have been identified. The software has been formatted into a new co-autonomy system which provides various levels of operator interaction and promises to allow effective application of telerobotic systems while code improvements are continuing.

  18. Identification and Functional Analysis of Flowering Related microRNAs in Common Wild Rice (Oryza rufipogon Griff.)

    PubMed Central

    Dong, Yibo; Yuan, Qianhua; Wang, Feng; Li, Weimin; Jiang, Ying; Jia, Shirong; Pei, XinWu

    2013-01-01

    Background MicroRNAs (miRNAs) is a class of non-coding RNAs involved in post- transcriptional control of gene expression, via degradation and/or translational inhibition. Six-hundred sixty-one rice miRNAs are known that are important in plant development. However, flowering-related miRNAs have not been characterized in Oryza rufipogon Griff. It was approved by supervision department of Guangdong wild rice protection. We analyzed flowering-related miRNAs in O. rufipogon using high-throughput sequencing (deep sequencing) to understand the changes that occurred during rice domestication, and to elucidate their functions in flowering. Results Three O. rufipogon sRNA libraries, two vegetative stage (CWR-V1 and CWR-V2) and one flowering stage (CWR-F2) were sequenced using Illumina deep sequencing. A total of 20,156,098, 21,531,511 and 20,995,942 high quality sRNA reads were obtained from CWR-V1, CWR-V2 and CWR-F2, respectively, of which 3,448,185, 4,265,048 and 2,833,527 reads matched known miRNAs. We identified 512 known rice miRNAs in 214 miRNA families and predicted 290 new miRNAs. Targeted functional annotation, GO and KEGG pathway analyses predicted that 187 miRNAs regulate expression of flowering-related genes. Differential expression analysis of flowering-related miRNAs showed that: expression of 95 miRNAs varied significantly between the libraries, 66 are flowering-related miRNAs, such as oru-miR97, oru-miR117, oru-miR135, oru-miR137, et al. 17 are early-flowering -related miRNAs, including osa-miR160f, osa-miR164d, osa-miR167d, osa-miR169a, osa-miR172b, oru-miR4, et al., induced during the floral transition. Real-time PCR revealed the same expression patterns as deep sequencing. miRNAs targets were confirmed for cleavage by 5′-RACE in vivo, and were negatively regulated by miRNAs. Conclusions This is the first investigation of flowering miRNAs in wild rice. The result indicates that variation in miRNAs occurred during rice domestication and lays a foundation for further study of phase change and flowering in O. rufipogon. Complicated regulatory networks mediated by multiple miRNAs regulate the expression of flowering genes that control the induction of flowering. PMID:24386120

  19. Microgravity Disturbance Predictions in the Combustion Integrated Rack

    NASA Astrophysics Data System (ADS)

    Just, M.; Grodsinsky, Carlos M.

    2002-01-01

    This paper will focus on the approach used to characterize microgravity disturbances in the Combustion Integrated Rack (CIR), currently scheduled for launch to the International Space Station (ISS) in 2005. Microgravity experiments contained within the CIR are extremely sensitive to vibratory and transient disturbances originating on-board and off-board the rack. Therefore, several techniques are implemented to isolate the critical science locations from external vibration. A combined testing and analysis approach is utilized to predict the resulting microgravity levels at the critical science location. The major topics to be addressed are: 1) CIR Vibration Isolation Approaches, 2) Disturbance Sources and Characterization, 3) Microgravity Predictive Modeling, 4) Science Microgravity Requirements, 6) Microgravity Control, and 7) On-Orbit Disturbance Measurement. The CIR is using the Passive Rack Isolation System (PaRIS) to isolate the rack from offboard rack disturbances. By utilizing this system, CIR is connected to the U.S. Lab module structure by either 13 or 14 umbilical lines and 8 spring / damper isolators. Some on-board CIR disturbers are locally isolated by grommets or wire ropes. CIR's environmental and science on board support equipment such as air circulation fans, pumps, water flow, air flow, solenoid valves, and computer hard drives cause disturbances within the rack. These disturbers along with the rack structure must be characterized to predict whether the on-orbit vibration levels during experimentation exceed the specified science microgravity vibration level requirements. Both vibratory and transient disturbance conditions are addressed. Disturbance levels/analytical inputs are obtained for each individual disturber in a "free floating" condition in the Glenn Research Center (GRC) Microgravity Emissions Lab (MEL). Flight spare hardware is tested on an Orbital Replacement Unit (ORU) basis. Based on test and analysis, maximum disturbance level allocations are developed for each ORU. The worst-case disturbances are input into an on-orbit analytical dynamic model of the rack. These models include both NASTRAN and MATLAB Simulink models , which include eigenvector and frequency inputs of the rack rigid body modes, the rack umbilical modes, and the racks' structural modes. The disturbance areas and science locations need to be modeled accurately to give valid predictions. The analytically determined microgravity vibration levels are compared to the CIR science requirements contained in the FCF Science Requirements Envelope Document (SRED). The predicted levels will be compared with the on-orbit measurements provided by the Space Acceleration Measurement System (SAMS) sensor, which is to be mounted on the CIR optics bench.

  20. Battery Resistance Analysis of ISS Power System

    NASA Technical Reports Server (NTRS)

    Newstadt, Gregory E.

    2004-01-01

    The computer package, SPACE (Systems Power Analysis for Capability Evaluation) was created by the members of LT-9D to perform power analysis and modeling of the electrical power system on the International Space Station (ISS). Written in FORTRAN, SPACE comprises thousands of lines of code and has been used profficiently in analyzing missions to the ISS. LT-9D has also used its expertise recently to investigate the batteries onboard the Hubble telescope. During the summer of 2004, I worked with the members of LT-9D, under the care of Dave McKissock. Solar energy will power the ISS through eight solar arrays when the ISS is completed, although only two arrays are currently connected. During the majority of the periods of sunlight, the solar arrays provide enough energy for the ISS. However, rechargeable Nickel-Hydrogen batteries are used during eclipse periods or at other times when the solar arrays cannot be used (at docking for example, when the arrays are turned so that they will not be damaged by the Shuttle). Thirty-eight battery cells are connected in series, which make up an ORU (Orbital Replacement Unit). An ISS "battery" is composed of two ORUs. a great deal of time into finding the best way to represent them in SPACE. During my internship, I investigated the resistance of the ISS batteries. SPACE constructs plots of battery charge and discharge voltages vs. time using a constant current. To accommodate for a time-varying current, the voltages are adjusted using the formula, DeltaV = DeltaI * Cell Resistance. To enhance our model of the battery resistance, my research concentrated on several topics: investigating the resistance of a qualification unit battery (using data gathered by LORAL), comparing the resistance of the qualification unit to SPACE, looking at the internal resistance and wiring resistance, and examining the impact of possible recommended changes to SPACE. The ISS batteries have been found to be very difficult to model, and LT-9D has dedicated

  1. Use of Human Modeling Simulation Software in the Task Analysis of the Environmental Control and Life Support System Component Installation Procedures

    NASA Technical Reports Server (NTRS)

    Estes, Samantha; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    Virtual reality and simulation applications are becoming widespread in human task analysis. These programs have many benefits for the Human Factors Engineering field. Not only do creating and using virtual environments for human engineering analyses save money and time, this approach also promotes user experimentation and provides increased quality of analyses. This paper explains the human engineering task analysis performed on the Environmental Control and Life Support System (ECLSS) space station rack and its Distillation Assembly (DA) subsystem using EAI's human modeling simulation software, Jack. When installed on the International Space Station (ISS), ECLSS will provide the life and environment support needed to adequately sustain crew life. The DA is an Orbital Replaceable Unit (ORU) that provides means of wastewater (primarily urine from flight crew and experimental animals) reclamation. Jack was used to create a model of the weightless environment of the ISS Node 3, where the ECLSS is housed. Computer aided drawings of the ECLSS rack and DA system were also brought into the environment. Anthropometric models of a 95th percentile male and 5th percentile female were used to examine the human interfaces encountered during various ECLSS and DA tasks. The results of the task analyses were used in suggesting modifications to hardware and crew task procedures to improve accessibility, conserve crew time, and add convenience for the crew. This paper will address some of those suggested modifications and the method of presenting final analyses for requirements verification.

  2. Managing NASA's International Space Station Logistics and Maintenance Program

    NASA Technical Reports Server (NTRS)

    Butina, Anthony

    2001-01-01

    The International Space Station's Logistics and Maintenance program has had to develop new technologies and a management approach for both space and ground operations. The ISS will be a permanently manned orbiting vehicle that has no landing gear, no international borders, and no organizational lines - it is one Station that must be supported by one crew, 24 hours a day, 7 days a week, 365 days a year. It flies partially assembled for a number of years before it is finally completed in 2006. It has over 6,000 orbital replaceable units (ORU), and spare parts which number into the hundreds of thousands, from 127 major US vendors and 70 major international vendors. From conception to operation, the ISS requires a unique approach in all aspects of development and operations. Today the dream is coming true; hardware is flying and hardware is failing. The system has been put into place to support the Station for both space and ground operations. It started with the basic support concept developed for Department of Defense systems, and then it was tailored for the unique requirements of a manned space vehicle. Space logistics is a new concept that has wide reaching consequences for both space travel and life on Earth. This paper discusses what type of organization has been put into place to support both space and ground operations and discusses each element of that organization. In addition, some of the unique operations approaches this organization has had to develop is discussed.

  3. Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

    NASA Technical Reports Server (NTRS)

    Chladek, John T.; Craver, William M.

    1994-01-01

    The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

  4. Semi-Automated Diagnosis, Repair, and Rework of Spacecraft Electronics

    NASA Technical Reports Server (NTRS)

    Struk, Peter M.; Oeftering, Richard C.; Easton, John W.; Anderson, Eric E.

    2008-01-01

    NASA's Constellation Program for Exploration of the Moon and Mars places human crews in extreme isolation in resource scarce environments. Near Earth, the discontinuation of Space Shuttle flights after 2010 will alter the up- and down-mass capacity for the International Space Station (ISS). NASA is considering new options for logistics support strategies for future missions. Aerospace systems are often composed of replaceable modular blocks that minimize the need for complex service operations in the field. Such a strategy however, implies a robust and responsive logistics infrastructure with relatively low transportation costs. The modular Orbital Replacement Units (ORU) used for ISS requires relatively large blocks of replacement hardware even though the actual failed component may really be three orders of magnitude smaller. The ability to perform in-situ repair of electronics circuits at the component level can dramatically reduce the scale of spares and related logistics cost. This ability also reduces mission risk, increases crew independence and improves the overall supportability of the program. The Component-Level Electronics Assembly Repair (CLEAR) task under the NASA Supportability program was established to demonstrate the practicality of repair by first investigating widely used soldering materials and processes (M&P) performed by modest manual means. The work will result in program guidelines for performing manual repairs along with design guidance for circuit reparability. The next phase of CLEAR recognizes that manual repair has its limitations and some highly integrated devices are extremely difficult to handle and demand semi-automated equipment. Further, electronics repairs require a broad range of diagnostic capability to isolate the faulty components. Finally repairs must pass functional tests to determine that the repairs are successful and the circuit can be returned to service. To prevent equipment demands from exceeding spacecraft volume capacity and skill demands from exceeding crew time and training limits, the CLEAR project is examining options provided by non-real time tele-operations, robotics, and a new generation of diagnostic equipment. This paper outlines a strategy to create an effective repair environment where, with the support of ground based engineers, crewmembers can diagnose, repair and test flight electronics in-situ. This paper also discusses the implications of successful tele-robotic repairs when expanded to rework and reconfiguration of used flight assets for building Constellation infrastructure elements.

  5. Overeducation and Earnings within an Occupation: Controlling for Occupational Heterogeneity of Nurses

    ERIC Educational Resources Information Center

    Rubb, Stephen

    2014-01-01

    Using data from the 2004 National Sample Survey of Registered Nurses, the role of occupational heterogeneity in the standard overeducation-required-undereducation (ORU) earnings function introduced by Duncan and Hoffman [1981. "The incidence and wage effects of overeducation." "Economics of Education Review" 1, no. 1: 75-86] is…

  6. Returns to Pre-Immigration Education for Non-Western Immigrants: Why so Low?

    ERIC Educational Resources Information Center

    Hardoy, Inés; Schøne, Pål

    2014-01-01

    The main purpose of this paper is to analyse the return to pre-immigration education for non-western immigrants, and explain why it is so low. Returns to one extra year of education is three times higher for ethnic Norwegians than for non-western immigrants. Using the method "Over-Required-Under" (ORU) education approach, we reveal that…

  7. TQM - Total Quality Management (Bibliography)

    DTIC Science & Technology

    1990-05-01

    ISBN: 0-941893-00-6 Price: $27.00 NAVSWC Library Call No: TS156 S358 GUIDE TO OUALITY CONTROL Author: Ishikawa , Kaoru Publisher: Asian Productivity...teachings of Juran, Deming, Feigenbaum, Crosby, Taguchi, Shewhart, Ishikawa , and others. 19 OUT OF BEDLAM: MANAGEMENT BY QUALITY LEADERSHIP Author...Price: $60.00 WHAT IS TOTAL QUALITY CONTROL? THE JAPANESE WAY Author. Ishikawa , K oru Publisher: Prentice Hall Date: 1985 Pagination: 215pp ISBN: 0-13

  8. Space Assembly, Maintenance and Servicing Study. Volume 4: Concept Development Plan.

    DTIC Science & Technology

    1986-01-01

    development of the concept development program (COP) plan: 1) Develop the CDP candidate work sheets 2) Categorize by application 3) Prioritize by... categorized under the ORU change-out section of this report, the large system assembly area will attempt to cover the EVA aspects of SAMS not discussed...space assemblies involve the evolvement of technologies related to multilevel orbital operating platforms on which both individual and cooperative

  9. Analysis and design of a high power, digitally-controlled spacecraft power system

    NASA Technical Reports Server (NTRS)

    Lee, F. C.; Cho, B. H.

    1990-01-01

    The progress to date on the analysis and design of a high power, digitally controlled spacecraft power system is described. Several battery discharger topologies were compared for use in the space platform application. Updated information has been provided on the battery voltage specification. Initially it was thought to be in the 30 to 40 V range. It is now specified to be 53 V to 84 V. This eliminated the tapped-boost and the current-fed auto-transformer converters from consideration. After consultations with NASA, it was decided to trade-off the following topologies: (1) boost converter; (2) multi-module, multi-phase boost converter; and (3) voltage-fed push-pull with auto-transformer. A non-linear design optimization software tool was employed to facilitate an objective comparison. Non-linear design optimization insures that the best design of each topology is compared. The results indicate that a four-module, boost converter with each module operating 90 degrees out of phase is the optimum converter for the space platform. Large-signal and small-signal models were generated for the shunt, charger, discharger, battery, and the mode controller. The models were first tested individually according to the space platform power system specifications supplied by NASA. The effect of battery voltage imbalance on parallel dischargers was investigated with respect to dc and small-signal responses. Similarly, the effects of paralleling dischargers and chargers were also investigated. A solar array and shunt model was included in these simulations. A model for the bus mode controller (power control unit) was also developed to interface the Orbital replacement Unit (ORU) model to the platform power system. Small signal models were used to generate the bus impedance plots in the various operating modes. The large signal models were integrated into a system model, and time domain simulations were performed to verify bus regulation during mode transitions. Some changes have subsequently been incorporated into the models. The changes include the use of a four module boost discharger, and a new model for the mode controller, which includes the effects of saturation. The new simulations for the boost discharger show the improvement in bus ripple that can be achieved by phase-shifted operation of each of the boost modules.

  10. Optical and Mechanical Properties of Infrared Materials.

    DTIC Science & Technology

    1980-07-01

    the negative ion vacancy site (holes at positive ion vacancy site) and pro- duce color centers (F orU centers) in the crystal. The density and dis...because they are re- latively easy to generate and measure. The negative ion vacancy density should be proportional to the F-center concentration in...Sankur H. Park R. T. Swimm R. Quimby N. Koumvakalis Research Assistants: A. Stewart J. S. Ko A. Halliyal T- R. Gururaja B. C. Chung S. T. Wu APPENDIX "A

  11. Peach Bottom Atomic Power Station recirc pipe dose rates with zinc injection and condenser replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiCello, D.C.; Odell, A.D.; Jackson, T.J.

    1995-03-01

    Peach Bottom Atomic Power Station (PBAPS) is located near the town of Delta, Pennsylvania, on the west bank of the Susquehanna River. It is situated approximately 20 miles south of Lancaster, Pennsylvania. The site contains two boiling water reactors of General Electric design and each rated at 3,293 megawatts thermal. The units are BWR 4s and went commercial in 1977. There is also a decommissioned high temperature gas-cooled reactor on site, Unit 1. PBAPS Unit 2 recirc pipe was replaced in 1985 and Unit 3 recirc pipes replaced in 1988 with 326 NGSS. The Unit 2 replacement pipe was electropolished,more » and the Unit 3 pipe was electropolished and passivated. The Unit 2 brass condenser was replaced with a Titanium condenser in the first quarter of 1991, and the Unit 3 condenser was replaced in the fourth quarter of 1991. The admiralty brass condensers were the source of natural zinc in both units. Zinc injection was initiated in Unit 2 in May 1991, and in Unit 3 in May 1992. Contact dose rate measurements were made in standard locations on the 28-inch recirc suction and discharge lines to determine the effectiveness of zinc injection and to monitor radiation build-up in the pipe. Additionally, HPGe gamma scans were performed to determine the isotopic composition of the oxide layer inside the pipe. In particular, the specific ({mu}Ci/cm{sup 2}) of Co-60 and Zn-65 were analyzed.« less

  12. 40 CFR 74.47 - Transfer of allowances from the replacement of thermal energy-combustion sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... replacement of thermal energy-combustion sources. 74.47 Section 74.47 Protection of Environment ENVIRONMENTAL...—combustion sources. (a) Thermal energy plan—(1) General provisions. The designated representative of an opt... quarter the replacement unit(s) will replace thermal energy of the opt-in source; (ii) The name...

  13. MELFI-3 Electronic Unit Replacement

    NASA Image and Video Library

    2011-07-01

    ISS028-E-013799 (1 July 2011) --- NASA astronaut Mike Fossum, Expedition 28 flight engineer, replaces a failed electronic unit for the Minus Eighty Laboratory Freezer for ISS 3 (MELFI-3) with a spare unit in the Kibo laboratory of the International Space Station.

  14. MELFI-3 Electronic Unit Replacement

    NASA Image and Video Library

    2011-07-01

    ISS028-E-013797 (1 July 2011) --- NASA astronaut Mike Fossum, Expedition 28 flight engineer, replaces a failed electronic unit for the Minus Eighty Laboratory Freezer for ISS 3 (MELFI-3) with a spare unit in the Kibo laboratory of the International Space Station.

  15. Assessment of lnternational Space Station (ISS) Lithium-ion Battery Thermal Runaway (TR)

    NASA Technical Reports Server (NTRS)

    Graika, Jason

    2017-01-01

    This task was developed in the wake of the Boeing 787 Dreamliner lithium-ion battery TR incidents of January 2013 and January 2014. The Electrical Power Technical Discipline Team supported the Dreamliner investigations and has followed up by applying lessons learned to conduct an introspective evaluation of NASA's risk of similar incidents in its own lithium-ion battery deployments. This activity has demonstrated that historically NASA, like Boeing and others in the aerospace industry, has emphasized the prevention of TR in a single cell within the battery (e.g., cell screening) but has not considered TR severity-reducing measures in the event of a single-cell TR event. center dotIn the recent update of the battery safety standard (JSC 20793) to address this paradigm shift, the NASA community included requirements for assessing TR severity and identifying simple, low-cost severity reduction measures. This task will serve as a pathfinder for meeting those requirements and will specifically look at a number of different lithium-ion batteries currently in the design pipeline within the ISS Program batteries that, should they fail in a Dreamliner-like incident, could result in catastrophic consequences. This test is an abuse test to understand the heat transfer properties of the cell and ORU in thermal runaway, with radiant barriers in place in a flight like test in on orbit conditions. This includes studying the heat flow and distribution in the ORU. This data will be used to validate the thermal runaway analysis. This test does not cover the ambient pressure case. center dotThere is no pass/ fail criteria for this test.

  16. Total ankle replacement systems available in the United States.

    PubMed

    Coetzee, J Chris; Deorio, James K

    2010-01-01

    Ankle replacement continues to be a viable option for treating patients with ankle arthritis. Over the past 10 years, there has been a significant increase in the number of ankle replacement systems available for use. Current controversy centers on whether fixed- or mobile-bearing devices are most advantageous. Most total ankle systems used outside the United States are mobile-bearing devices, whereas ankle replacement systems used in the United States are all essentially fixed-bearing devices. Not all ankles with degenerative changes are amenable to replacement surgery, and several exclusion criteria are well documented. Ankle replacement is especially complicated because of the ankle's proximity to the foot and the important role that the balance and alignment of the foot play in the success of the ankle replacement. Foot deformities should be treated before or at the time of ankle replacement surgery. Ignoring foot deformities can lead to failure of the ankle replacement. It is also of paramount importance to consider the stability of the ankle ligaments. An unstable ankle with a varus or valgus deformity of more than 20 degrees is probably not amenable to ankle replacement. There are currently no reliable options to predictably reconstruct the lateral or medial ligaments in these severe deformities. It is important to be aware of the ankle replacement systems currently available in the United States and understand the key features of each design. Devices approved by the US Food and Drug Administration, a device that is awaiting approval, and a device that is being evaluated by the Food and Drug Administration in a prospective randomized clinical trial are discussed, along with an objective comparison of fixed- and mobile-bearing devices.

  17. 77 FR 41814 - Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Unit 1 result primarily from periodic testing of diesel generators and fire water pump diesel engines... rural. GGNS Unit 1 is a General Electric Mark 3 boiling-water reactor. Identification of the Proposed... following: replacing the reactor feed pump turbine rotors; replacing the main generator current transformers...

  18. New Generation General Purpose Computer (GPC) compact IBM unit

    NASA Technical Reports Server (NTRS)

    1991-01-01

    New Generation General Purpose Computer (GPC) compact IBM unit replaces a two-unit earlier generation computer. The new IBM unit is documented in table top views alone (S91-26867, S91-26868), with the onboard equipment it supports including the flight deck CRT screen and keypad (S91-26866), and next to the two earlier versions it replaces (S91-26869).

  19. Evaluation of Forged Helicopter Components Processed with Controlled Solidification and Thermal-Mechanical Treatments.

    DTIC Science & Technology

    1980-06-01

    PAGEREDISUCON E BEFOR COMPLEF)C TI NG FOMO 12. GOVLIENAN ACESOON.7VRTI EESAAOGNME . A U AC (nIn, on Deec . ai7e -I Jueaaee vd deey y lok um fouRMLMCAIL tak...2O 0Tf0 U02 00 1 it0 as a Sea Goo 0-0 c9 Sm . or.u9r09 04 dAA 0 0 0 𔄃 0 0 0 as gas .tstd a ass as 4.J -* N2 9: 01 1 1, 1 N1 , NN N N N _;I

  20. Optimization of replacement and inspection decisions for multiple components on a power system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauney, D.A.

    1994-12-31

    The use of optimization on the rescheduling of replacement dates provided a very proactive approach to deciding when components on individual units need to be addressed with a run/repair/replace decision. Including the effects of time value of money and taxes and unit need inside the spreadsheet model allowed the decision maker to concentrate on the effects of engineering input and replacement date decisions on the final net present value (NPV). The personal computer (PC)-based model was applied to a group of 140 forced outage critical fossil plant tube components across a power system. The estimated resulting NPV of the optimizationmore » was in the tens of millions of dollars. This PC spreadsheet model allows the interaction of inputs from structural reliability risk assessment models, plant foreman interviews, and actual failure history on a by component by unit basis across a complete power production system. This model includes not only the forced outage performance of these components caused by tube failures but, in addition, the forecasted need of the individual units on the power system and the expected cost of their replacement power if forced off line. The use of cash flow analysis techniques in the spreadsheet model results in the calculation of an NPV for a whole combination of replacement dates. This allows rapid assessments of {open_quotes}what if{close_quotes} scenarios of major maintenance projects on a systemwide basis and not just on a unit-by-unit basis.« less

  1. Astronaut tool development: An orbital replaceable unit-portable handhold

    NASA Technical Reports Server (NTRS)

    Redmon, John W., Jr.

    1989-01-01

    A tool to be used during astronaut Extra-Vehicular Activity (EVA) replacement of spent or defective electrical/electronic component boxes is described. The generation of requirements and design philosophies are detailed, as well as specifics relating to mechanical development, interface verifications, testing, and astronaut feedback. Findings are presented in the form of: (1) a design which is universally applicable to spacecraft component replacement, and (2) guidelines that the designer of orbital replacement units might incorporate to enhance spacecraft on-orbit maintainability and EVA mission safety.

  2. Electronic Repair Concepts for Long-Duration Spaceflight

    NASA Technical Reports Server (NTRS)

    Easton, John; Pettegrew, Richard D.; Struk, Peter M.

    2007-01-01

    Constraints on the mass and volume that can be allocated for electronics spares and repair equipment on long-duration space missions mean that NASA must look at repair strategies beyond the traditional approach, which has been to replace faulty subsystems in a modular form, termed Orbital Replacement Units or Line Replacement Units. Other possible strategies include component and board-level replacement, modular designs that allow reprogramming of less-critical systems to take the place of more critical failed systems, and a blended approach which uses elements of each of these approaches, along with a limited number of Line Replacement Units. This paper presents some of the constraints and considerations that affect the decision on how to approach electronics repair for long duration space missions, and discusses the benefits and limitations of each of the previously mentioned strategies.

  3. Embedded piezoelectrics for sensing and energy harvesting in total knee replacement units

    NASA Astrophysics Data System (ADS)

    Wilson, Brooke E.; Meneghini, Michael; Anton, Steven R.

    2015-04-01

    The knee replacement is the second most common orthopedic surgical intervention in the United States, but currently only 1 in 5 knee replacement patients are satisfied with their level of pain reduction one year after surgery. It is imperative to make the process of knee replacement surgery more objective by developing a data driven approach to ligamentous balance, which increases implant life. In this work, piezoelectric materials are considered for both sensing and energy harvesting applications in total knee replacement implants. This work aims to embed piezoelectric material in the polyethylene bearing of a knee replacement unit to act as self-powered sensors that will aid in the alignment and balance of the knee replacement by providing intraoperative feedback to the surgeon. Postoperatively, the piezoelectric sensors can monitor the structural health of the implant in order to perceive potential problems before they become bothersome to the patient. Specifically, this work will present on the use of finite element modeling coupled with uniaxial compression testing to prove that piezoelectric stacks can be utilized to harvest sufficient energy to power sensors needed for this application.

  4. Dynamic biomechanical examination of the lumbar spine with implanted total spinal segment replacement (TSSR) utilizing a pendulum testing system.

    PubMed

    Daniels, Alan H; Paller, David J; Koruprolu, Sarath; Palumbo, Mark A; Crisco, Joseph J

    2013-01-01

    Biomechanical investigations of spinal motion preserving implants help in the understanding of their in vivo behavior. In this study, we hypothesized that the lumbar spine with implanted total spinal segment replacement (TSSR) would exhibit decreased dynamic stiffness and more rapid energy absorption compared to native functional spinal units under simulated physiologic motion when tested with the pendulum system. Five unembalmed, frozen human lumbar functional spinal units were tested on the pendulum system with axial compressive loads of 181 N, 282 N, 385 N, and 488 N before and after Flexuspine total spinal segment replacement implantation. Testing in flexion, extension, and lateral bending began by rotating the pendulum to 5°; resulting in unconstrained oscillatory motion. The number of rotations to equilibrium was recorded and bending stiffness (N-m/°) was calculated and compared for each testing mode. The total spinal segment replacement reached equilibrium with significantly fewer cycles to equilibrium compared to the intact functional spinal unit at all loads in flexion (p<0.011), and at loads of 385 N and 488 N in lateral bending (p<0.020). Mean bending stiffness in flexion, extension, and lateral bending increased with increasing load for both the intact functional spinal unit and total spinal segment replacement constructs (p<0.001), with no significant differences in stiffness between the intact functional spinal unit and total spinal segment replacement in any of the test modes (p>0.18). Lumbar functional spinal units with implanted total spinal segment replacement were found to have similar dynamic bending stiffness, but absorbed energy at a more rapid rate than intact functional spinal units during cyclic loading with an unconstrained pendulum system. Although the effects on clinical performance of motion preserving devices is not fully known, these results provide further insight into the biomechanical behavior of this device under approximated physiologic loading conditions.

  5. Dynamic Biomechanical Examination of the Lumbar Spine with Implanted Total Spinal Segment Replacement (TSSR) Utilizing a Pendulum Testing System

    PubMed Central

    Daniels, Alan H.; Paller, David J.; Koruprolu, Sarath; Palumbo, Mark A.; Crisco, Joseph J.

    2013-01-01

    Background Biomechanical investigations of spinal motion preserving implants help in the understanding of their in vivo behavior. In this study, we hypothesized that the lumbar spine with implanted total spinal segment replacement (TSSR) would exhibit decreased dynamic stiffness and more rapid energy absorption compared to native functional spinal units under simulated physiologic motion when tested with the pendulum system. Methods Five unembalmed, frozen human lumbar functional spinal units were tested on the pendulum system with axial compressive loads of 181 N, 282 N, 385 N, and 488 N before and after Flexuspine total spinal segment replacement implantation. Testing in flexion, extension, and lateral bending began by rotating the pendulum to 5°; resulting in unconstrained oscillatory motion. The number of rotations to equilibrium was recorded and bending stiffness (N-m/°) was calculated and compared for each testing mode. Results The total spinal segment replacement reached equilibrium with significantly fewer cycles to equilibrium compared to the intact functional spinal unit at all loads in flexion (p<0.011), and at loads of 385 N and 488 N in lateral bending (p<0.020). Mean bending stiffness in flexion, extension, and lateral bending increased with increasing load for both the intact functional spinal unit and total spinal segment replacement constructs (p<0.001), with no significant differences in stiffness between the intact functional spinal unit and total spinal segment replacement in any of the test modes (p>0.18). Conclusions Lumbar functional spinal units with implanted total spinal segment replacement were found to have similar dynamic bending stiffness, but absorbed energy at a more rapid rate than intact functional spinal units during cyclic loading with an unconstrained pendulum system. Although the effects on clinical performance of motion preserving devices is not fully known, these results provide further insight into the biomechanical behavior of this device under approximated physiologic loading conditions. PMID:23451222

  6. Impact of the economic downturn on total joint replacement demand in the United States: updated projections to 2021.

    PubMed

    Kurtz, Steven M; Ong, Kevin L; Lau, Edmund; Bozic, Kevin J

    2014-04-16

    Few studies have explored the role of the National Health Expenditure and macroeconomics on the utilization of total joint replacement. The economic downturn has raised questions about the sustainability of growth for total joint replacement in the future. Previous projections of total joint replacement demand in the United States were based on data up to 2003 using a statistical methodology that neglected macroeconomic factors, such as the National Health Expenditure. Data from the Nationwide Inpatient Sample (1993 to 2010) were used with United States Census and National Health Expenditure data to quantify historical trends in total joint replacement rates, including the two economic downturns in the 2000s. Primary and revision hip and knee arthroplasty were identified using codes from the International Classification of Diseases, Ninth Revision, Clinical Modification. Projections in total joint replacement were estimated using a regression model incorporating the growth in population and rate of arthroplasties from 1993 to 2010 as a function of age, sex, race, and census region using the National Health Expenditure as the independent variable. The regression model was used in conjunction with government projections of National Health Expenditure from 2011 to 2021 to estimate future arthroplasty rates in subpopulations of the United States and to derive national estimates. The growth trend for the incidence of joint arthroplasty, for the overall United States population as well as for the United States workforce, was insensitive to economic downturns. From 2009 to 2010, the total number of procedures increased by 6.0% for primary total hip arthroplasty, 6.1% for primary total knee arthroplasty, 10.8% for revision total hip arthroplasty, and 13.5% for revision total knee arthroplasty. The National Health Expenditure model projections for primary hip replacement in 2020 were higher than a previously projected model, whereas the current model estimates for total knee arthroplasty were lower. Economic downturns in the 2000s did not substantially influence the national growth trends for hip and knee arthroplasty in the United States. These latest updated projections provide a basis for surgeons, hospitals, payers, and policy makers to plan for the future demand for total joint replacement surgery.

  7. 78 FR 21924 - Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... approval to replace the Unit 4 turbine at the Jordan Dam Project. Specifically, the licensee proposes the following work: complete turbine replacement, wicket gate system rehabilitation or replacement, gate stem bushing replacement, turbine and generator bearing refurbishment, and related component replacement. The...

  8. Management of Microcircuit Obsolescence in a Pre-Production ACAT-ID Missile Program

    DTIC Science & Technology

    2002-12-01

    and Engineering Center ASIC Application Specific Integrated Circuit AVCOM Avionics Component Obsolescence Management BRU Battery Replaceable Unit...then just a paper qualification, e.g. Board or Battery Replaceable Unit ( BRU ) testing. 5 After-market Package The Die is Available and Can Be...Encapsulated Microcircuits (PEM), speed change, failure rate) 8 Emulation Manufacture or re-engineering of a FFF Replacement 9 CCA or BRU Redesign Board

  9. Documentation of the DART/FITT system

    NASA Image and Video Library

    1995-05-01

    Photographic documentation of the Dextrous Anthropomorphic Robot Testbed (DART)/Full-Immersion Telepresence Testbed (FITT) system. Photos were taken in the Dexterous Robotics Lab, bldg 9N, room 113, and include: DART with upper arm cover removed (08920-1); DART head fully assembled (08922); DART head (08923,08939); DART only official view (08924-5); DART head with shell removed (08926-7); DART/FITT together with operator (08928-9); DART with tools (08930-1,08934); DART with tether hook (08932); DART with rope (08933); DART with Portable Foot Restraint (PFR) (08935); DART pulling out ORU (08936); DART with electronics panel (08937); and DART with automated ball grasp (08938).

  10. Geographic List of Prime Contract Awards. Oct 1992-Sep 1993. (Addison, Alabama-Yell County, Arkansas). Part 1

    DTIC Science & Technology

    1994-03-01

    LL. LLj. to 00 co 9 L LL a.. OLG. LLL. . LL.LA.I ND 1 40£’ I) W Ia o Go LA.. W OHP IV 4~ Oru IY 0i’ 00 4) NNN 4~ 0) 0£O ) O V a o G CV)) M£’ IT ( Mm...1I000 0 000 0000000 0 000 000 0000 M N L. 1 00 110 0000oo 000000000 00o 0000 C0000 W0000000 LUJ Ka I 00W KaRL L A.. MEM M~nE)E mmmmmm LL.E M .E()E m MM

  11. High efficiency novel window air conditioner

    DOE PAGES

    Bansal, Pradeep

    2015-07-24

    This paper presents the technical development of a high efficiency window air conditioner. In order to achieve higher energy efficiency ratio (EER), the original capacity of the R410A unit was downgraded by replacing the original compressor with a lower capacity but higher EER compressor, while all heat exchangers and the chassis from the original unit were retained. The other subsequent major modifications included – the AC fan motor being replaced with a brushless high efficiency electronically commuted motor (ECM) motor, the capillary tube being replaced with a needle valve to better control the refrigerant flow and refrigerant set points, andmore » R410A being replaced with drop-in environmentally friendly binary mixture of R32 (85% molar concentration)/R125 (15% molar concentration). All these modifications resulted in significant EER enhancement of the modified unit.« less

  12. High efficiency novel window air conditioner

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bansal, Pradeep

    This paper presents the technical development of a high efficiency window air conditioner. In order to achieve higher energy efficiency ratio (EER), the original capacity of the R410A unit was downgraded by replacing the original compressor with a lower capacity but higher EER compressor, while all heat exchangers and the chassis from the original unit were retained. The other subsequent major modifications included – the AC fan motor being replaced with a brushless high efficiency electronically commuted motor (ECM) motor, the capillary tube being replaced with a needle valve to better control the refrigerant flow and refrigerant set points, andmore » R410A being replaced with drop-in environmentally friendly binary mixture of R32 (85% molar concentration)/R125 (15% molar concentration). All these modifications resulted in significant EER enhancement of the modified unit.« less

  13. 30 CFR 7.69 - Approval marking.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...

  14. 30 CFR 7.69 - Approval marking.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...

  15. 30 CFR 7.69 - Approval marking.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...

  16. 30 CFR 7.69 - Approval marking.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...

  17. 30 CFR 7.69 - Approval marking.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that the unit's components must not be disassembled or removed. (d) The replacement battery types if the unit has replaceable batteries. (e) A warning placed next to the charging connector that the battery only be charged in a fresh air location if rechargeable batteries are used. (f) A warning that the...

  18. Mastracchio during EMU FPS Remove and Replace OPS

    NASA Image and Video Library

    2014-04-14

    Expedition 39 flight engineer Rick Mastracchio poses for a photo with the replacement Fan Pump Separator (FPS) and Extravehicular Mobility Unit (EMU) 3005. Image was taken in the Quest Airlock (A/L) during FPS remove and replace operations.

  19. 24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...

  20. 24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...

  1. 24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...

  2. 24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...

  3. 24 CFR 42.375 - One-for-one replacement of lower-income dwelling units.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false One-for-one replacement of lower-income dwelling units. 42.375 Section 42.375 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development DISPLACEMENT, RELOCATION ASSISTANCE, AND REAL PROPERTY...

  4. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, P.R.; Van Dyke, J.W; McConnell, B.W.

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformersmore » may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124 of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on ways to achieve the potential energy savings. Using survey data obtained from utilities and analyses of the economics of refurbishment versus replacement of distribution transformers that are removed from service, it is found that on average utilities are implementing reasonable decisions on refurbishment versus replacement.« less

  5. Energy efficiency effect on the public street lighting by using LED light replacement and kwh-meter installation at DKI Jakarta Province, Indonesia

    NASA Astrophysics Data System (ADS)

    Sudarmono, Panggih; Deendarlianto; Widyaparaga, Adhika

    2018-05-01

    Public street lighting consumes large energy for the public interest, but many street lights still do not use energy-saving technologies. In 2014, Provincial Government of DKI Jakarta operated 179,305 units of street lights. Of the number of installed armature, 92 % of them or 166,441 units are HPS (High-Pressure Sodium) armatures which are inefficient. In 2016, the Provincial Government of DKI Jakarta cut down the energy used for street lighting, by implementing the programs of kWh-meter installation in every street lighting panel and use energy-saving lamps equipped with the smart system. The Provincial Government of DKI Jakarta is registered with 6,399 customer IDs in PLN (State Owned Electric Company), and gradually carried out the kWh Meter installation and changes to the contract. The program to use energy-saving lights done by replacing the HPS armature that is not energy efficient to LED armature which is known to be energy efficient. Until the end of 2016, the number of armatures that has been replaced was 89,417 units. The research results on 25 samples of PLN customer IDs and the replacement of 2,162 units armature, showed that the energy efficiency through kWh meter installation and armature replacement reduce the power consumption from 330,414 kWh to 71,278 kWh or by 78.43%. Generally, there was a decrease in the value of electricity bill compared to the before the replacement. The program of kWh-meter installations and replacement of the armature has a payback period of 2.66 years.

  6. Hierarchical Ada robot programming system (HARPS)- A complete and working telerobot control system based on the NASREM model

    NASA Technical Reports Server (NTRS)

    Leake, Stephen; Green, Tom; Cofer, Sue; Sauerwein, Tim

    1989-01-01

    HARPS is a telerobot control system that can perform some simple but useful tasks. This capability is demonstrated by performing the ORU exchange demonstration. HARPS is based on NASREM (NASA Standard Reference Model). All software is developed in Ada, and the project incorporates a number of different CASE (computer-aided software engineering) tools. NASREM was found to be a valid and useful model for building a telerobot control system. Its hierarchical and distributed structure creates a natural and logical flow for implementing large complex robust control systems. The ability of Ada to create and enforce abstraction enhanced the implementation of such control systems.

  7. Electronics reliability fracture mechanics. Volume 1: Causes of failures of shop replaceable units and hybrid microcircuits

    NASA Astrophysics Data System (ADS)

    Kallis, J.; Buechler, D.; Erickson, J.; Westerhuyzen, D. V.; Strokes, R.

    1992-05-01

    This is the first of two volumes. The other volume (WL-TR-91-3119) is 'Fracture Mechanics'. The objective of the Electronics Reliability Fracture Mechanics (ERFM) program was to develop and demonstrate a life prediction technique for electronic assemblies, when subjected to environmental stress of vibration and thermal cycling, based upon the mechanical properties of the materials and packaging configurations which make up an electronic system. A detailed investigation was performed of the following two shop replaceable units (SRUs): Timing and Control Module (P/N 3562102) and Linear Regulator Module (P/N 3569800). The SRUs are in the Programmable Signal Processor (3137042) Line Replaceable Unit (LRU) of the Hughes AN/APG-63 Radar for the F-15 Aircraft.

  8. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformersmore » may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.« less

  9. Monetary benefits of preventing childhood lead poisoning with lead-safe window replacement.

    PubMed

    Nevin, Rick; Jacobs, David E; Berg, Michael; Cohen, Jonathan

    2008-03-01

    Previous estimates of childhood lead poisoning prevention benefits have quantified the present value of some health benefits, but not the costs of lead paint hazard control or the benefits associated with housing and energy markets. Because older housing with lead paint constitutes the main exposure source today in the US, we quantify health benefits, costs, market value benefits, energy savings, and net economic benefits of lead-safe window replacement (which includes paint stabilization and other measures). The benefit per resident child from improved lifetime earnings alone is $21,195 in pre-1940 housing and $8685 in 1940-59 housing (in 2005 dollars). Annual energy savings are $130-486 per housing unit, with or without young resident children, with an associated increase in housing market value of $5900-14,300 per housing unit, depending on home size and number of windows replaced. Net benefits are $4490-5,629 for each housing unit built before 1940, and $491-1629 for each unit built from 1940-1959, depending on home size and number of windows replaced. Lead-safe window replacement in all pre-1960 US housing would yield net benefits of at least $67 billion, which does not include many other benefits. These other benefits, which are shown in this paper, include avoided Attention Deficit Hyperactivity Disorder, other medical costs of childhood lead exposure, avoided special education, and reduced crime and juvenile delinquency in later life. In addition, such a window replacement effort would reduce peak demand for electricity, carbon emissions from power plants, and associated long-term costs of climate change.

  10. A COTS-Based Replacement Strategy for Aging Avionics Computers

    DTIC Science & Technology

    2001-12-01

    Communication Control Unit. A COTS-Based Replacement Strategy for Aging Avionics Computers COTS Microprocessor Real Time Operating System New Native Code...Native Code Objec ts Native Code Thread Real - Time Operating System Legacy Function x Virtual Component Environment Context Switch Thunk Add-in Replace

  11. 77 FR 16430 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... opposite the line replaceable unit racking. This AD requires replacing a certain aluminum high pressure... proposed to require replacing a certain aluminum high pressure pipe with a new corrosion resistant... comply with paragraph (1) of this [EASA] AD, unless, inadvertently, the high pressure pipe P/N...

  12. Approximating the stress field within the unit cell of a fabric reinforced composite using replacement elements

    NASA Technical Reports Server (NTRS)

    Foye, R. L.

    1993-01-01

    This report concerns the prediction of the elastic moduli and the internal stresses within the unit cell of a fabric reinforced composite. In the proposed analysis no restrictions or assumptions are necessary concerning yarn or tow cross-sectional shapes or paths through the unit cell but the unit cell itself must be a right hexagonal parallelepiped. All the unit cell dimensions are assumed to be small with respect to the thickness of the composite structure that it models. The finite element analysis of a unit cell is usually complicated by the mesh generation problems and the non-standard, adjacent-cell boundary conditions. This analysis avoids these problems through the use of preprogrammed boundary conditions and replacement materials (or elements). With replacement elements it is not necessary to match all the constitutional material interfaces with finite element boundaries. Simple brick-shaped elements can be used to model the unit cell structure. The analysis predicts the elastic constants and the average stresses within each constituent material of each brick element. The application and results of this analysis are demonstrated through several example problems which include a number of composite microstructures.

  13. Electronic-type vacuum gauges with replaceable elements

    DOEpatents

    Edwards, Jr., David

    1984-01-01

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge.

  14. Mobile dental operations: capital budgeting and long-term viability.

    PubMed

    Arevalo, Oscar; Chattopadhyay, Amit; Lester, Harold; Skelton, Judy

    2010-01-01

    The University of Kentucky College of Dentistry (UKCD) runs a large mobile dental operation. Economic conditions dictate that as the mobile units age it will be harder to find donors willing or able to provide the financial resources for asset replacement. In order to maintain current levels of access for the underserved, consideration of replacement is paramount. A financial analysis for a new mobile unit was conducted to determine self-sustainability, return on investment (ROI), and feasibility of generating a cash reserve for its replacement in 12 years. Information on clinical income, operational and replacement costs, and capital costs was collected. A capital budgeting analysis (CBA) was conducted using the Net Present Value (NPV) methodology in four different scenarios. Depreciation funding was calculated by transferring funds from cash inflows and reinvested to offset depreciation at fixed compound interest. A positive ROI was obtained for two scenarios. He depreciation fund did not generate a cash reserve sufficient to replace the mobile unit. Mobile dental programs can play a vital role in providing access to care to underserved populations and ensuring their mission requires long-term planning. Careful financial viability and CBA based on sound assumptions are excellent decision-making tools.

  15. Dynamics and control of robot for capturing objects in space

    NASA Astrophysics Data System (ADS)

    Huang, Panfeng

    Space robots are expected to perform intricate tasks in future space services, such as satellite maintenance, refueling, and replacing the orbital replacement unit (ORU). To realize these missions, the capturing operation may not be avoided. Such operations will encounter some challenges because space robots have some unique characteristics unfound on ground-based robots, such as, dynamic singularities, dynamic coupling between manipulator and space base, limited energy supply and working without a fixed base, and so on. In addition, since contacts and impacts may not be avoided during capturing operation. Therefore, dynamics and control problems of space robot for capturing objects are significant research topics if the robots are to be deployed for the space services. A typical servicing operation mainly includes three phases: capturing the object, berthing and docking the object, then repairing the target. Therefore, this thesis will focus on resolving some challenging problems during capturing the object, berthing and docking, and so on. In this thesis, I study and analyze the dynamics and control problems of space robot for capturing objects. This work has potential impact in space robotic applications. I first study the contact and impact dynamics of space robot and objects. I specifically focus on analyzing the impact dynamics and mapping the relationship of influence and speed. Then, I develop the fundamental theory for planning the minimum-collision based trajectory of space robot and designing the configuration of space robot at the moment of capture. To compensate for the attitude of the space base during the capturing approach operation, a new balance control concept which can effectively balance the attitude of the space base using the dynamic couplings is developed. The developed balance control concept helps to understand of the nature of space dynamic coupling, and can be readily applied to compensate or minimize the disturbance to the space base. After capturing the object, the space robot must complete the following two tasks: one is to berth the object, and the other is to re-orientate the attitude of the whole robot system for communication and power supply. Therefore, I propose a method to accomplish these two tasks simultaneously using manipulator motion only. The ultimate goal of space services is to realize the capture and manipulation autonomously. Therefore, I propose an affective approach based on learning human skill to track and capture the objects automatically in space. With human-teaching demonstration, the space robot is able to learn and abstract human tracking and capturing skill using an efficient neural-network learning architecture that combines flexible Cascade Neural Networks with Node Decoupled Extended Kalman Filtering (CNN-NDEKF). The simulation results attest that this approach is useful and feasible in tracking trajectory planning and capturing of space robot. Finally I propose a novel approach based on Genetic Algorithms (GAs) to optimize the approach trajectory of space robots in order to realize effective and stable operations. I complete the minimum-torque path planning in order to save the limited energy in space, and design the minimum jerk trajectory for the stabilization of the space manipulator and its space base. These optimal algorithms are very important and useful for the application of space robot.

  16. Electronic-type vacuum gauges with replaceable elements

    DOEpatents

    Edwards, D. Jr.

    1984-09-18

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge. 5 figs.

  17. Oligosaccharide Mimetics

    NASA Astrophysics Data System (ADS)

    Wessel, Hans Peter; Lucas, Susana Dias

    The important roles of oligosaccharides in physiological and pathophysiological processes have spurred the development of mimetics. Oligosaccharide mimetics discussed in this chapter may possess a linker of two or more atoms such as amide or urea groups that may lead to isosteric linkage replacements but mostly do not. Larger groups that replace a full sugar unit we refer to as spacers and have grouped molecules with flexible acyclic spacers and more rigid cyclic spacers . The employment of pharmacophore models has led to oligosaccharide mimetics with only one sugar unit or finally without any saccharide unit as exemplified in mimotopes.

  18. The management of failed ankle replacement.

    PubMed

    Kotnis, R; Pasapula, C; Anwar, F; Cooke, P H; Sharp, R J

    2006-08-01

    Advances in the design of the components for total ankle replacement have led to a resurgence of interest in this procedure. Between January 1999 and December 2004, 16 patients with a failed total ankle replacement were referred to our unit. In the presence of infection, a two-stage salvage procedure was planned. The first involved the removal of the components and the insertion of a cement spacer. Definitive treatment options included hindfoot fusion with a circular frame or amputation. When there was no infection, a one-stage salvage procedure was planned. Options included hindfoot fusion with an intramedullary nail or revision total ankle replacement. When there was suspicion of infection, a percutaneous biopsy was performed. The patients were followed up for a minimum of 12 months. Of the 16 patients, 14 had aseptic loosening, five of whom underwent a revision total ankle replacement and nine a hindfoot fusion. Of the two with infection, one underwent fusion and the other a below-knee amputation. There were no cases of wound breakdown, nonunion or malunion. Management of the failed total ankle replacement should be performed by experienced surgeons and ideally in units where multidisciplinary support is available. Currently, a hindfoot fusion appears to be preferable to a revision total ankle replacement.

  19. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kosonen, M.; Hakola, M.

    2012-07-01

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to themore » program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)« less

  20. Developing conjugated polymers with high electron affinity by replacing a C-C unit with a B←N unit.

    PubMed

    Dou, Chuandong; Ding, Zicheng; Zhang, Zijian; Xie, Zhiyuan; Liu, Jun; Wang, Lixiang

    2015-03-16

    The key parameters of conjugated polymers are lowest unoccupied molecular orbital (LUMO) and highest occupied molecular orbital (HOMO) energy levels. Few approaches can simultaneously lower LUMO and HOMO energy levels of conjugated polymers to a large extent (>0.5 eV). Disclosed herein is a novel strategy to decrease both LUMO and HOMO energy levels of conjugated polymers by about 0.6 eV through replacement of a C-C unit by a B←N unit. The replacement makes the resulting polymer transform from an electron donor into an electron acceptor, and is proven by fluorescence quenching experiments and the photovoltaic response. This work not only provides an effective approach to tune the LUMO/HOMO energy levels of conjugated polymers, but also uses organic boron chemistry as a new toolbox to develop conjugated polymers with high electron affinity for polymer optoelectronic devices. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  1. 78 FR 8821 - Abandoned Mine Land Reclamation Program; Limited Liability for Noncoal Reclamation by Certified...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... balance replacement funds and certified in lieu funds--paid from the general funds of the United States Treasury and not subject to annual appropriations. Prior balance replacement funds are authorized by...(h)(1) and (h)(2) of SMCRA (prior balance replacement funding and certified in lieu funding...

  2. Design and operation experience of 230 MWe CFB boilers at Turow power plant in Poland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nowak, W.; Bis, Z.; Laskawiec, J.

    The Power Station Turow is located in Bogatynia, Poland, and has operated 10 pulverized coal units each of 200 MW. The plant provided 2000 MW at the lowest cost per kWh in Poland. The Turow units have approached and in some cases already gone beyond their 25--30 year's design life. To meet Poland's new environmental standards, which are now compatible with the EU, Turow decided to replace and upgrade six units (No. 1 to 6) from 200 MW to 230 MW units and remove one unit No. 7. Units No. 8, 9 and 10 were equipped with dry sorbent desulfurizationmore » technology. Units No. 1 and 2 have been replaced with new clean coal circulating fluidized bed technology. The Power Station Turow with six CFB units is to be the largest in the world power station based on fluidized bed technology.« less

  3. Usage of Bone Replacement Grafts in Periodontics and Oral Implantology and Their Current Levels of Clinical Evidence - A Systematic Assessment.

    PubMed

    Salem, Daliah; Natto, Zuhair; Elangovan, Satheesh; Karimbux, Nadeem

    2016-08-01

    The aim of this review is to evaluate the levels of clinical evidence for bone replacement grafts available in the United States for periodontics and oral implantology purposes. A search was performed using PubMed, the Cochrane Library, and Google Scholar for articles relating to the use of bone replacement grafts in implant and/or periodontics by two independent reviewers. Articles unrelated to the topic, not involving patients, not including abstracts, or in languages other than English were excluded. Selected articles were graded according to "levels of evidence" based on guidelines originally introduced by Wright et al. (2003). There was limited published peer-reviewed clinical literature available regarding US commercially available bone replacement grafts in periodontics and oral implantology. Of 144 bone replacement grafts available in the United States according to Avila-Ortiz et al. (2013), only 52 met the inclusion criteria. The majority of materials used were allografts (26 of 93 available in the United States), followed by alloplasts (15 of 30) and xenografts (11 of 21). Dental providers should be aware of the limited evidence that qualified for a strong rating supporting the clinical efficacy of these materials for periodontics and oral implantology purposes using the inclusion criteria selected in this study.

  4. Functional Tooth Regeneration Using a Bioengineered Tooth Unit as a Mature Organ Replacement Regenerative Therapy

    PubMed Central

    Imamura, Aya; Ogawa, Miho; Yasukawa, Masato; Yamazaki, Hiromichi; Morita, Ritsuko; Ikeda, Etsuko; Nakao, Kazuhisa; Takano-Yamamoto, Teruko; Kasugai, Shohei; Saito, Masahiro; Tsuji, Takashi

    2011-01-01

    Donor organ transplantation is currently an essential therapeutic approach to the replacement of a dysfunctional organ as a result of disease, injury or aging in vivo. Recent progress in the area of regenerative therapy has the potential to lead to bioengineered mature organ replacement in the future. In this proof of concept study, we here report a further development in this regard in which a bioengineered tooth unit comprising mature tooth, periodontal ligament and alveolar bone, was successfully transplanted into a properly-sized bony hole in the alveolar bone through bone integration by recipient bone remodeling in a murine transplantation model system. The bioengineered tooth unit restored enough the alveolar bone in a vertical direction into an extensive bone defect of murine lower jaw. Engrafted bioengineered tooth displayed physiological tooth functions such as mastication, periodontal ligament function for bone remodeling and responsiveness to noxious stimulations. This study thus represents a substantial advance and demonstrates the real potential for bioengineered mature organ replacement as a next generation regenerative therapy. PMID:21765896

  5. Rehabilitation of a 410-MW utility boiler at Costa Sur, Puerto Rico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosado, R.; Salmeron, M.

    1995-12-31

    To increase unit reliability and availability and to meet the current and future electric power demands in Puerto Rico, the Puerto Rico Electric Power Authority (PREPA) recently performed a scheduled outage rehabilitation of Costa Sur Power Station Unit 5. This major rehabilitation of a 23-year-old, 410 MW, oil-fired boiler was accompanied by the upgrading of the low-pressure turbine with new rotors. The boiler rehabilitation included the replacement of all waterwall floor panels from just below the burner windbox, down to the lower drum. Temporary support was provided for the lower drum and its structural system during the panel replacement. Themore » steam drum internals were completely rehabilitated, with the installation of a new liner and cleaning and repair of other internals as required. The superheater and reheater desuperheater liners were also replaced. In addition, all major components of both the firing system and the air preheaters were replaced. The gas recirculation fan was rehabilitated, and its discharge duct was replaced.« less

  6. Single Project Replaces District's Windows.

    ERIC Educational Resources Information Center

    American School and University, 1981

    1981-01-01

    The towns of Maplewood and South Orange (New Jersey) earmarked over $1 million, raised from a bond issue, to replace with thermal aluminum-framed units the 2400 worn out windows in eight 50-year-old schools. (Author)

  7. Incidence and Patient Outcomes in Renal Replacement Therapy After Orthotopic Liver Transplant.

    PubMed

    Ayhan, Asude; Ersoy, Zeynep; Ulas, Aydin; Zeyneloglu, Pinar; Pirat, Arash; Haberal, Mehmet

    2017-02-01

    Our objective was to evaluate the incidence of renal replacement therapy after orthotopic liver transplant and to evaluate and analyze patient outcomes. We performed a retrospective analysis of 177 consecutive patients at a tertiary care unit who underwent orthotopic liver transplant between January 2010 and June 2016. Patients who were admitted to the intensive care unit after orthotopic liver transplant and who required renal replacement therapy were included. A total of 177 (79 adult, 98 pediatric) orthotopic liver transplants were performed during the study period. Of these, 35 patients (19%) required renal replacement therapy during the early posttransplantation period. After excluding 5 patients with previous chronic renal failure, 30 patients (17%; 20 adult [25% ], 10 pediatric [10% ]) with acute kidney injury required renal replacement therapy. The mean patient age was 31.1 ± 20.0 years, with a mean Model for End-stage Liver Disease score of 16.7 ± 12.3. Of the patients with acute kidney injury who underwent renal replacement therapy, in-hospital mortality was 23.3% (7 of 30 patients), and 40% remained on dialysis. No significant difference was seen in mortality between early versus delayed initiation of renal replacement therapy in patients with stage 3 acute kidney injury (P = .17). Of liver transplant recipients who present with acute kidney injury, 19% require renal replacement therapy, and in-hospital mortality is 20% in the early postoperative period.

  8. Evaluation of the impact of banking umbilical cord blood units with high cell dose for ethnically diverse patients.

    PubMed

    Stritesky, Gretta; Wadsworth, Kimberly; Duffy, Merry; Buck, Kelly; Dehn, Jason

    2018-02-01

    Umbilical cord blood units provide an important stem cell source for transplantation, particularly for patients of ethnic diversity who may not have suitably matched available, adult-unrelated donors. However, with the cost of cord blood unit acquisition from public banks significantly higher than that for adult-unrelated donors, attention is focused on decreasing cost yet still providing cord blood units to patients in need. Historical practices of banking units with low total nucleated cell counts, including units with approximately 90 × 10 7 total nucleated cells, indicates that most banked cord blood units have much lower total nucleated cell counts than are required for transplant. The objective of this study was to determine the impact on the ability to identify suitable cord blood units for transplantation if the minimum total nucleated cell count for banking were increased from 90 × 10 7 to 124 or 149 × 10 7 . We analyzed ethnically diverse patients (median age, 3 years) who underwent transplantation of a single cord blood unit in 2005 to 2016. A cord blood unit search was evaluated to identify units with equal or greater human leukocyte antigen matching and a greater total nucleated cell count than that of the transplanted cord blood unit (the replacement cord blood unit). If the minimum total nucleated cell count for banking increased to 124 or 149 × 10 7 , then from 75 to 80% of patients would still have at least 1 replacement cord blood unit in the current (2016) cord blood unit inventory. The best replacement cord blood units were often found among cords with the same ethnic background as the patient. The current data suggest that, if the minimum total nucleated cell count were increased for banking, then it would likely lead to an inventory of more desirable cord blood units while having minimal impact on the identification of suitable cord blood units for transplantation. © 2017 AABB.

  9. 77 FR 12448 - Airworthiness Directives; Pratt & Whitney Division Turbofan Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... Delta Airlines, Inc. requested that we specify replacing affected FMUs with FMU P/N 53U044, or later FAA... actual cost of the AD; not other costs. We did not change the AD. Request To Replace FMUs On-Wing United Parcel Service Co. requested that we include in the AD the option to perform on-wing replacements of...

  10. Energy content in dried leaf litter of some oaks and mixed mesophytic species that replace oaks

    Treesearch

    Aaron D. Stottlemeyer; G. Geoff Wang; Patrick H. Brose; Thomas A. Waldrop

    2010-01-01

    Mixed-mesophytic hardwood tree species are replacing upland oaks in vast areas of the Eastern United States deciduous forest. Some researchers have suggested that the leaf litter of mixed-mesophytic, oak replacement species renders forests less flammable where forest managers wish to restore a natural fire regime. We performed chemical analyses on dried leaf litter...

  11. Prevalence of Total Hip and Knee Replacement in the United States.

    PubMed

    Maradit Kremers, Hilal; Larson, Dirk R; Crowson, Cynthia S; Kremers, Walter K; Washington, Raynard E; Steiner, Claudia A; Jiranek, William A; Berry, Daniel J

    2015-09-02

    Descriptive epidemiology of total joint replacement procedures is limited to annual procedure volumes (incidence). The prevalence of the growing number of individuals living with a total hip or total knee replacement is currently unknown. Our objective was to estimate the prevalence of total hip and total knee replacement in the United States. Prevalence was estimated using the counting method by combining historical incidence data from the National Hospital Discharge Survey and the Healthcare Cost and Utilization Project (HCUP) State Inpatient Databases from 1969 to 2010 with general population census and mortality counts. We accounted for relative differences in mortality rates between those who have had total hip or knee replacement and the general population. The 2010 prevalence of total hip and total knee replacement in the total U.S. population was 0.83% and 1.52%, respectively. Prevalence was higher among women than among men and increased with age, reaching 5.26% for total hip replacement and 10.38% for total knee replacement at eighty years. These estimates corresponded to 2.5 million individuals (1.4 million women and 1.1 million men) with total hip replacement and 4.7 million individuals (3.0 million women and 1.7 million men) with total knee replacement in 2010. Secular trends indicated a substantial rise in prevalence over time and a shift to younger ages. Around 7 million Americans are living with a hip or knee replacement, and consequently, in most cases, are mobile, despite advanced arthritis. These numbers underscore the substantial public health impact of total hip and knee arthroplasties. Copyright © 2015 by The Journal of Bone and Joint Surgery, Incorporated.

  12. A Numerical Investigation of the Non-Linear Mechanics of Wave Disturbances in Plane Poiseuille Flows

    DTIC Science & Technology

    1971-09-02

    i OCXXLL UJ rn - •• • O •>a£ •> O »QC • S —nt-Q£ 00_IUJ< O0_IUJ< XLUI—LU QU< • OU< • *.< •>_! »•< »-J Z •Q.NOZ ROCOCO ...OU< * OU< *U- ^"O •X •» »Oi-i »<t *—J *< *—I »—<CM z ••a.cMoz Rococo -l-ocoto—• •»** o<<<x«-i • ora-<i- oru.<ti-FHO—z JUJO’-’Z...roro CO ro rococo OOOOOOOOOOOOOO oooooooooooooo oooooooooooooo oooooooooooooo ooooooooooooooooooooooooo co C* o -* c\\j ro -4- i n >o l*» oo cr

  13. KSC-99pp0244

    NASA Image and Video Library

    1999-02-25

    An ORU Transfer Device (OTD) on top of the International Cargo Carrier (ICC) is checked by Manfred Nordhoff, with Daimler-Chrysler Aerospace (DASA); Ben Greene, with Lockheed Martin; Robert Wilkes (behind arm number two), with Lockheed Martin; Lora Laurence and Charles Franca, with Johnson Space Center. The OTD is a U.S.-built crane that will be stowed on the International Space Station's Unity module for use during future ISS assembly missions. The nonpressurized ICC fits inside the payload bay of the orbiter. The ICC will also carry the SPACEHAB Oceaneering Space System Box (SHOSS), a logistics items carrier. SHOSS can hold a maximum of 400 pounds of equipment and will carry items to be used during STS-96 and future ISS assembly flights. The ICC will fly on mission STS-96, targeted for launch on May 20

  14. "Life without nuclear power": A nuclear plant retirement formulation model and guide based on economics. San Onofre Nuclear Generating Station case: Economic impacts and reliability considerations leading to plant retirement

    NASA Astrophysics Data System (ADS)

    Wasko, Frank

    Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic assessment review and then on to the stakeholder cost benefit analysis (if model qualifications are met) leading to a final plant retirement decision. This application via the model and guide, in turn, will lead electric utilities to explore system upgrade import opportunities and mitigation measures versus building new replacement generation facilities. United States nuclear reactors are licensed for 40 years with a 20 year extension available prior to the expiration date (EIA, 2013). Since late 2012, electric power companies have announced the early retirement of four uneconomical nuclear power plants while other studies have indicated that as many as 70 percent of United States nuclear power plants are potentially at risk for early retirement (Crooks, 2014 and Cooper, 2013). A high percentage of these aforementioned nuclear plants have operating licenses that will not expire until 2030 and beyond. Thus, for the most part, replacement power contingency planning has not been initiated for these plants or is still in preliminary stages. The recent nuclear plant retirements are the first since 1998 (EIA, 2013). Decisions to retire the plants involved concerns over maintenance and repair costs as well as declining profitability (EIA, 2013). In addition, the Energy Information Administration (2010-2012) released data that demonstrated that the worst 25 percent of United States nuclear plants are far more expensive to operate and generate electricity than new gas plants. It is equally important to understand and explain the economic and power replacement implications to both ratepayers and end-users. A SONGS case study analysis will review the economic, operational and political challenges that SCE faced leading to the retirement decision of SONGS. As preface to the case study, replacement steam generators (RSGs) were installed in Unit 2 in 2009 and in Unit 3 in 2010. In January 2012, while Unit 2 was down for routine maintenance, a small leak was discovered inside a steam generator in Unit 3. Because of the situation, both units remained shut down to evaluate the cause of the leakage and to make repairs. SCE submitted plans to the Nuclear Regulatory Commission (NRC) to re-start Unit 2 at reduced power. However, concerns over the length of the review process and the high costs associated with steam generator repairs led SCE to retire both reactors (SCE SONGS Fact Sheets, 2012-2013). Finally, collaborative resource power replacement planning is needed more than ever as nuclear facilities in the United States are now being retired for economic related reasons (Crooks, 2014). This collaborative power replacement process and implementation must encompass all relevant stakeholders including state grid operators, ratepayers, shareholders and the electric utility company.

  15. Selection of Environmentally Friendly Solvents for the Extravehicular Mobility Unit Secondary Oxygen Pack Cold Trap Testing

    NASA Technical Reports Server (NTRS)

    Steele, John; Chullen, Cinda; Morenz, Jesse; Stephenson, Curtis

    2010-01-01

    Freon-113(TradeMark) has been used as a chemistry lab sampling solvent at NASA/JSC for EMU (extravehicular Mobility Unit) SOP (Secondary Oxygen Pack) oxygen testing Cold Traps utilized at the USA (United Space Alliance) Houston facility. Similar testing has occurred at the HSWL (Hamilton Sundstrand Windsor Locks) facility. A NASA Executive Order bans the procurement of all ODS (ozone depleting substances), including Freon-113 by the end of 2009. In order to comply with NASA direction, HSWL began evaluating viable solvents to replace Freon-113 . The study and testing effort to find Freon-113 replacements used for Cold Trap sampling is the subject of this paper. Test results have shown HFE-7100 (a 3M fluorinated ether) to be an adequate replacement for Freon-113 as a solvent to remove and measure the non-volatile residue collected in a Cold Trap during oxygen testing. Furthermore, S-316 (a Horiba Instruments Inc. high molecular weight, non-ODS chlorofluorocarbon) was found to be an adequate replacement for Freon-113 as a solvent to reconstitute non-volatile residue removed from a Cold Trap during oxygen testing for subsequent HC (hydrocarbon) analysis via FTIR (Fourier Transform Infrared Spectroscopy).

  16. Description of the attitude control, guidance and navigation space replaceable units for automated space servicing of selected NASA missions

    NASA Technical Reports Server (NTRS)

    Chobotov, V. A.

    1974-01-01

    Control elements such as sensors, momentum exchange devices, and thrusters are described which can be used to define space replaceable units (SRU), in accordance with attitude control, guidance, and navigation performance requirements selected for NASA space serviceable mission spacecraft. A number of SRU's are developed, and their reliability block diagrams are presented. An SRU assignment is given in order to define a set of feasible space serviceable spacecraft for the missions of interest.

  17. 44 CFR 62.20 - Claims appeals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (includes contractors' estimates), detailing unit cost and quantities for the items needing repair or replacement; replacement cost proofs of loss; Preliminary Report; Final Report; detailed damaged personal... wind policies and any claim information submitted to the other companies; Waiver, Letter of Map...

  18. 44 CFR 62.20 - Claims appeals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... (includes contractors' estimates), detailing unit cost and quantities for the items needing repair or replacement; replacement cost proofs of loss; Preliminary Report; Final Report; detailed damaged personal... wind policies and any claim information submitted to the other companies; Waiver, Letter of Map...

  19. Replacement of fluid-filter elements without interruption of flow

    NASA Technical Reports Server (NTRS)

    Kotler, R. A.; Ward, J. B.

    1969-01-01

    Gatling-type filter assembly, preloaded with several filter elements enables filter replacement without breaking into the operative fluid system. When the filter element becomes contaminated, a unit inner subassembly is rotated 60 degrees to position a clean filter in the line.

  20. Replacement solvents for use in chemical synthesis

    DOEpatents

    Molnar, Linda K.; Hatton, T. Alan; Buchwald, Stephen L.

    2001-05-15

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  1. [Cost-benefit analysis of the implementation of automated drug-dispensing systems in Critical Care and Emergency Units].

    PubMed

    Poveda Andrés, J L; García Gómez, C; Hernández Sansalvador, M; Valladolid Walsh, A

    2003-01-01

    To determine monetary impact when traditional drug floor stocks are replaced by Automated Drug Dispensing Systems (ADDS) in the Medical Intensive Care Unit, Surgical Intensive Care Unit and the Emergency Room. We analysed four different flows considered to be determinant when implementing ADDS in a hospital environment: capital investment, staff costs, inventory costs and costs related to drug use policies. Costs were estimated by calculation of the current net value. Its analysis shows that those expenses derived from initial investment are compensated by the three remaining flows, with costs related to drug use policies showing the most substantial savings. Five years after initial investment, global cash-flows have been estimated at 300.525 euros. Replacement of traditional floor stocks by ADDS in the Medical Intensive Care Unit, Surgery Intensive Care Unit and the Emergency Room produces a positive benefit/cost ratio (1.95).

  2. 77 FR 55159 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... oxygen mask stowage box units; and replacement of the crew oxygen mask stowage box unit with a new crew oxygen mask stowage unit, if necessary. That NPRM was prompted by reports indicating that certain crew oxygen mask stowage box units were possibly delivered with a burr in the inlet fitting. The burr might...

  3. Acute Respiratory Failure Induced by Magnesium Replacement in a 62-Year-Old Woman with Myasthenia Gravis.

    PubMed

    Singh, Paramveer; Idowu, Olakunle; Malik, Imrana; Nates, Joseph L

    2015-10-01

    Magnesium is known to act at the neuromuscular junction by inhibiting the presynaptic release of acetylcholine and desensitizing the postsynaptic membrane. Because of these effects, magnesium has been postulated to potentiate neuromuscular weakness. We describe the case of a 62-year-old woman with myasthenia gravis and a metastatic thymoma who was admitted to our intensive care unit for management of a myasthenic crisis. The patient's neuromuscular weakness worsened in association with standard intravenous magnesium replacement, and the exacerbated respiratory failure necessitated intubation, mechanical ventilation, and an extended stay in the intensive care unit. The effect of magnesium replacement on myasthenia gravis patients has not been well documented, and we present this case to increase awareness and stimulate research. In addition, we discuss the relevant medical literature.

  4. KSC-08pd2084

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier, for the Hubble Space Telescope is unwrapped and awaits final processing for launch. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  5. 75 FR 67637 - Airworthiness Directives; The Boeing Company Model 737-700, -700C, -800, and -900ER Series...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... numbers of the crew oxygen mask stowage box units; and replacement of the crew oxygen mask stowage box unit with a new crew oxygen mask stowage unit, if necessary. This proposed AD results [[Page 67638

  6. KSC-99pp0239

    NASA Image and Video Library

    1999-02-25

    At Astrotech, Titusville, Fla., Harald Schnier and Manfred Nordhoff, with Daimler-Chrysler Aerospace (DASA), look over the International Cargo Carrier that will be used during future International Space Station (ISS) assembly missions. On top is Robert Wilkes, with Lockheed Martin. Behind the ladder in the background is Ben Greene, with Lockheed Martin. The nonpressurized ICC fits inside the payload bay of the orbiter. The ICC will carry the SPACEHAB Oceaneering Space System Box (SHOSS), a logistics items carrier. SHOSS can hold a maximum of 400 pounds of equipment and will carry items to be used during STS-96 and future ISS assembly flights. Also aboard the ICC will be the ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on Unity for use during future ISS assembly missions. The ICC will fly on mission STS-96, targeted for launch on May 20

  7. 76 FR 5144 - Notice of Intent To Prepare an Environmental Impact Statement for U.S. Navy F-35C West Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ...) aircraft on the West Coast of the United States. Under this proposal, a total of seven active-duty F/A-18C... one-for-one replacement. The aging FA-18C Hornet aircraft are expected to be replaced with F-35C..., Southwest; 619-532-2799. SUPPLEMENTARY INFORMATION: As a replacement for the Navy's aging F/A- 18C Hornet...

  8. Development of a Tissue Engineered Scaffold for Meniscus Replacement

    DTIC Science & Technology

    2008-12-01

    include loss of manpower, rehabilitation costs, waste of training time/ money , cost to retrain members as replacements, hospitalization costs, disability...injuries in the United States Armed Forces. Mil Med, 1999. 164(8 Suppl): p. 633 pages. Lauder , T.D., et al., Sports and physical training injury

  9. FINDING SOLVENT REPLACEMENTS TO REDUCE THE POTENTIAL ENVIRONMENTAL IMPACT OF INDUSTRIAL WASTES

    EPA Science Inventory

    The United States Environmental Protection Agency has developed a solvent substitution software tool PARIS II (Program for Assisting the Replacement of Industrial Solvents, version 2.0). The purpose of this tool is to find less toxic solvents or solvent mixtures which may functi...

  10. Optical Sensor of Thermal Gas Flow Based on Fiber Bragg Grating.

    PubMed

    Jiang, Xu; Wang, Keda; Li, Junqing; Zhan, Hui; Song, Zhenan; Che, Guohang; Lyu, Guohui

    2017-02-15

    This paper aims at solving the problem of explosion proof in measurement of thermal gas flow using electronic sensor by presenting a new type of flow sensor by optical fiber heating. A measuring unit based on fiber Bragg grating (FBG) for fluid temperature and a unit for heat dissipation are designed to replace the traditional electronic sensors. The light in C band from the amplified spontaneous emission (ASE) light source is split, with one part used to heat the absorbing coating and the other part used in the signal processing unit. In the heating unit, an absorbing coating is introduced to replace the traditional resistance heating module to minimize the risk of explosion. The measurement results demonstrate a fine consistency between the flow and temperature difference in simulation. The method to enhance the measurement resolution of flow is also discussed.

  11. ISS EPS Orbital Replacement Unit Block Diagrams

    NASA Technical Reports Server (NTRS)

    Schmitz, Gregory V.

    2001-01-01

    The attached documents are being provided to Switching Power Magazine for information purposes. This magazine is writing a feature article on the International Space Station Electrical Power System, focusing on the switching power processors. These units include the DC-DC Converter Unit (DDCU), the Bi-directional Charge/Discharge Unit (BCDU), and the Sequential Shunt Unit (SSU). These diagrams are high-level schematics/block diagrams depicting the overall functionality of each unit.

  12. 37 CFR 1.805 - Replacement or supplement of deposit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Replacement or supplement of deposit. 1.805 Section 1.805 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  13. 37 CFR 1.805 - Replacement or supplement of deposit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Replacement or supplement of deposit. 1.805 Section 1.805 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES Biotechnology Invention Disclosures Deposit...

  14. Potential nutritional and economic effects of replacing juice with fruit in the diets of children in the United States.

    PubMed

    Monsivais, Pablo; Rehm, Colin D

    2012-05-01

    To estimate the nutritional and economic effects of substituting whole fruit for juice in the diets of children in the United States. Secondary analyses using the 2001-2004 National Health and Nutrition Examination Survey and a national food prices database. Energy intakes, nutrient intakes, and diet costs were estimated before and after fruit juices were completely replaced with fruit in 3 models that emphasized fruits that were fresh, inexpensive, and widely consumed and in a fourth model that partially replaced juice with fruit, capping juice at recommended levels. A nationwide, representative sample of children in the United States. A total of 7023 children aged 3 to 18 years. Systematic complete or partial replacement of juice with fruit. Difference in energy intakes, nutrient intakes, and diet costs between observed and modeled diets. For children who consumed juice, replacement of all juice servings with fresh, whole fruit led to a projected reduction in dietary energy of 233 kJ/d (-2.6% difference [95% CI, -5.1% to -0.1%]), an increase in fiber of 4.3 g/d (31.1% difference [95% CI, 26.4%-35.9%]), and an increase in diet cost of $0.54/d (13.3% difference [95% CI, 8.8%-17.8%]). Substitution of juice with fresh fruit has the potential to reduce energy intake and improve the adequacy of fiber intake in children's diets. This would likely increase costs for schools, childcare providers, and families. These cost effects could be minimized by selecting processed fruits, but fewer nutritional gains would be achieved.

  15. The COHORT System - Is It Meeting the Army’s Needs

    DTIC Science & Technology

    1988-06-06

    soldier replacement system. Analysis compar- ing the COHORT system to the older, and still widely used, Individual Replace- ment System (IRS) is provided...Trinn (OMMe) soldie I •, I IIsstem. Analysis c~mering the a- system to the older, arid still3 widely used, Individural Syasit em (M) is rovided. 7he...allegiances frequently...efficiencies in individual replacements take no account of unit cohesion in the tank company , cannon battery or the Infantry

  16. Doing without dimensions

    NASA Astrophysics Data System (ADS)

    Spurgin, C. B.

    1986-03-01

    The author discusses the concept of dimensions of a physical quantity, and the relationship between derived units (expressed in terms of their base units) and the dimensions of the derived quantities. He calls for the replacement of 'dimensions' by base units in the GCE A-level syllabus and provides some recommendations to GCE examining boards.

  17. KSC-08pd2077

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  18. KSC-08pd2081

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  19. KSC-08pd2075

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to remove the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  20. KSC-08pd2074

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is secured on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  1. KSC-08pd2076

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  2. KSC-08pd2070

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  3. KSC-08pd2073

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is positioned on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. KSC-08pd2080

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  5. KSC-08pd2078

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  6. KSC-08pd2079

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  7. Operations analysis (study 2.1): Payload designs for space servicing

    NASA Technical Reports Server (NTRS)

    Wolfe, R. R.

    1974-01-01

    Potential modes of operating in space in the space shuttle era are documented. The October 1973 NASA Mission Model provides a definition of various NASA and non-DOD automated payload configurations when employed in an expendable mode. The model also specifies a launch schedule for initial deployment of payloads as well as for subsequent replacements at periodic cycles. This model and its associated payload definitions serve as a foundation for the data presented in this report. The reference model has been revised to reflect automated space servicing of payloads as an operational concept instead of the existing expendable approach. The indication is that the bulk of a payload's subsystems and mission equipment require no support over the lifetime of the program. However, failure of a single unit could result in loss of the mission objectives. When space servicing is employed, the approach is to replace only that unit causing the anomaly. This concept affords an opportunity to standardize space replacable units, as well as to reduce the expense of logistics support, by allowing multiple servicing on any single upper stage/shuttle flight.

  8. 76 FR 20969 - City and Borough of Sitka, AK; Notice of Application Accepted for Filing, Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... megawatt (MW) turbine-generator units near the existing powerhouse. Additionally, the Fish Valve Unit would be replaced with a new 1 MW turbine-generator unit and the 870 kilowatt Pulp Mill Feeder Unit would... new water intake in the reservoir 109 feet above the existing intake. The higher maximum reservoir...

  9. Determining the value of the fine-structure constant from a current balance: Getting acquainted with some upcoming changes to the SI

    NASA Astrophysics Data System (ADS)

    Davis, Richard S.

    2017-05-01

    The revised International System of Units (SI), expected to be approved late in 2018, has implications for physics pedagogy. The ampere definition, which dates from 1948, will be replaced by a definition that fixes the numerical value of the elementary charge e in coulombs. The kilogram definition, which dates from 1889, will be replaced by a definition that fixes the numerical value of the Planck constant h in joule seconds. Existing SI equations will be completely unaffected. However, there will be a largely negligible, but nevertheless necessary, change to published numerical factors relating SI electrical units to their corresponding units in the Gaussian and other CGS systems of units. The implications of the revised SI for electrical metrology are neatly illustrated by considering the interpretation of results obtained from a current balance in the present SI and in the revised SI.

  10. Environmentally Friendly Replacement of Mature 200 MW Coal-Fired Power Blocks with 2 Boilers Working on One 500 MW Class Steam Turbine Generator (2on1 Unit Concept)

    NASA Astrophysics Data System (ADS)

    Grzeszczak, Jan; Grela, Łukasz; Achter, Thomas

    2017-12-01

    The paper covers problems of the owners of a fleet of long-operated conventional power plants that are going to be decommissioned soon in result of failing to achieve new admissible emissions levels or exceeding pressure elements design lifetime. Energoprojekt-Katowice SA, Siemens AG and Rafako SA presents their joint concept of the solution which is a 2on1 concept - replacing two unit by two ultra-supercritical boilers feeding one turbine. Polish market has been taken as an example.

  11. Degradation of Beta-Cloth Covering for a Battery Orbital Replacement Unit in Low Earth Orbit

    NASA Technical Reports Server (NTRS)

    Gaier, James R.; Baldwin, Sammantha; Folz, Angela D.; Waters, Deborah L.; Loos, Alyssa

    2016-01-01

    Samples from the B-cloth cover for a battery orbit replaceable unit from the International Space Station were characterized using optical and electron microscopy, UV-vis-NIR spectrophotometry, and x-ray energy dispersive spectroscopy. Results showed that in areas where the fabric was exposed to solar radiation the absorptance increased by as much as 20 percent, and the peak difference was in the ultraviolet, indicating that the increased absorptance may have been due to radiation. The emissivity of the material over a temperature range of 300 - 700 K was essentially unchanged.

  12. Degradation of Beta Cloth Covering for a Battery Orbital Replacement Unit in Low Earth Orbit

    NASA Technical Reports Server (NTRS)

    Gaier, James R.; Waters, Deborah L.; Baldwin, Sammantha; Folz, Angela D.; Loos, Alyssa

    2016-01-01

    Samples from the beta cloth cover for a battery orbit replaceable unit from the International Space Station (ISS) were characterized using optical and electron microscopy, UV-vis-NIR spectrophotometry, and x-ray energy dispersive spectroscopy. Results showed that in areas where the fabric was exposed to solar radiation the absorptance increased by as much as 20 percent, and the peak difference was in the ultraviolet, indicating that the increased absorptance may have been due to radiation. The emissivity of the material over a temperature range of 300 to 700 K was essentially unchanged.

  13. 37 CFR 7.28 - Replacement of U.S. registration by registered extension of protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Replacement of U.S. registration by registered extension of protection. 7.28 Section 7.28 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT...

  14. Estimation of Variance in the Case of Complex Samples.

    ERIC Educational Resources Information Center

    Groenewald, A. C.; Stoker, D. J.

    In a complex sampling scheme it is desirable to select the primary sampling units (PSUs) without replacement to prevent duplications in the sample. Since the estimation of the sampling variances is more complicated when the PSUs are selected without replacement, L. Kish (1965) recommends that the variance be calculated using the formulas…

  15. HEATING ATTIC AIR USING SOLAR THERMAL ENERGY FOR SPACE HEATING AND DRYING APPLICATIONS

    EPA Science Inventory

    This unit is expected to replace the conventional forms of drying and will be able to supplement space heating. Replacement of these current forms of drying and space heating will result in the reduction of energy consumption from this sector which will also lead to cost savin...

  16. 37 CFR 7.29 - Effect of replacement on U.S. registration.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...

  17. 37 CFR 7.29 - Effect of replacement on U.S. registration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...

  18. 37 CFR 7.29 - Effect of replacement on U.S. registration.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...

  19. 37 CFR 7.29 - Effect of replacement on U.S. registration.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...

  20. 37 CFR 7.29 - Effect of replacement on U.S. registration.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Effect of replacement on U.S. registration. 7.29 Section 7.29 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE RULES OF PRACTICE IN FILINGS PURSUANT TO THE PROTOCOL RELATING TO THE MADRID AGREEMENT...

  1. 46 CFR 56.01-1 - Scope (replaces 100.1).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...

  2. 46 CFR 56.01-1 - Scope (replaces 100.1).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...

  3. 46 CFR 56.01-1 - Scope (replaces 100.1).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...

  4. 46 CFR 56.01-1 - Scope (replaces 100.1).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...

  5. 46 CFR 56.01-1 - Scope (replaces 100.1).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Scope (replaces 100.1). 56.01-1 Section 56.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...

  6. Development of an intelligent controller for power generators

    NASA Astrophysics Data System (ADS)

    Maxted, Clive; Waller, Winston

    2005-01-01

    This paper is a description of the development of an embedded controller for high power industrial diesel generators. The aim of the project was to replace the existing discrete logic design by an intelligent versatile and user configurable control system. A prototype embedded PC controlled system was developed, capable of fully replacing the existing system, with a colour TFT display and keypad. Features include fully automatic generator control as before with status and alarm display and monitoring of engine parameters, along with data logging, remote communications and a means of analysing data. The unit was tested on the bench and on diesel generators for the core controlling functionality to prove compliance with the specifications. The results of the testing proved the unit's suitability as a replacement for the existing system in its intended environment. The significance of this study is that a low cost replacement solution has been found for an industrial application by transferring modern technological knowledge to a small business. The company are now able to build on the design and take it into production, reducing servicing and production costs.

  7. 77 FR 61303 - Airworthiness Directives; Turbomeca S.A. Turboshaft Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-09

    ...-mechanical metering unit (HMU). This proposed AD would require replacing the HMU at a reduced life. We are... pressure/low pressure (HP/LP) pump assembly within the hydro- mechanical metering unit (HMU), removed...-mechanical metering unit (HMU). We are issuing this AD to prevent an uncommanded in-flight shutdown of the...

  8. Interactive autonomy and robotic skills

    NASA Technical Reports Server (NTRS)

    Kellner, A.; Maediger, B.

    1994-01-01

    Current concepts of robot-supported operations for space laboratories (payload servicing, inspection, repair, and ORU exchange) are mainly based on the concept of 'interactive autonomy' which implies autonomous behavior of the robot according to predefined timelines, predefined sequences of elementary robot operations and within predefined world models supplying geometrical and other information for parameter instantiation on the one hand, and the ability to override and change the predefined course of activities by human intervention on the other hand. Although in principle a very powerful and useful concept, in practice the confinement of the robot to the abstract world models and predefined activities appears to reduce the robot's stability within real world uncertainties and its applicability to non-predefined parts of the world, calling for frequent corrective interaction by the operator, which in itself may be tedious and time-consuming. Methods are presented to improve this situation by incorporating 'robotic skills' into the concept of interactive autonomy.

  9. Space platform power system hardware testbed

    NASA Technical Reports Server (NTRS)

    Sable, D.; Patil, A.; Sizemore, T.; Deuty, S.; Noon, J.; Cho, B. H.; Lee, F. C.

    1991-01-01

    The scope of the work on the NASA Space Platform includes the design of a multi-module, multi-phase boost regulator, and a voltage-fed, push-pull autotransformer converter for the battery discharger. A buck converter was designed for the charge regulator. Also included is the associated mode control electronics for the charger and discharger, as well as continued development of a comprehensive modeling and simulation tool for the system. The design of the multi-module boost converter is discussed for use as a battery discharger. An alternative battery discharger design is discussed using a voltage-fed, push-pull autotransformer converter. The design of the charge regulator is explained using a simple buck converter. The design of the mode controller and effects of locating the bus filter capacitor bank 20 feet away from the power ORU are discussed. A brief discussion of some alternative topologies for battery charging and discharging is included. The power system modeling is described.

  10. KSC-08pd2071

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, at ground-level left, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  11. KSC-08pd2072

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, seen behind the ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  12. Flow-Control Unit For Nitrogen And Hydrogen Gases

    NASA Technical Reports Server (NTRS)

    Chang, B. J.; Novak, D. W.

    1990-01-01

    Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.

  13. Modernisation Issues of Diesel-Electric Shunting Locomotive Power Units

    NASA Astrophysics Data System (ADS)

    Hoimoja, Hardi; Jalakas, Tanel; Rosin, Argo; Rassylkin, Anton

    2010-01-01

    The research concentrates on the modernisation issues of inefficient diesel-electric shunting locomotives, produced in the former Soviet Union. The existing diesel-generator unit, serving as an onboard power plant can be replaced by hybridised units, with an energy storage unit acting as a peaking power source for dynamic modes. By integrating an energy storage unit into the power plant, the locomotive traction drive becomes hybridised, consuming less fuel during transients and idling.

  14. 78 FR 7770 - Boyce Hydro Power, LLC; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... Description of Application: The licensee proposes to replace one of the project's three existing turbine/generator units with a new unit. The project's maximum hydraulic capacity would remain the same but the new...

  15. Tungsten insulated susceptor cup for high temperature induction furnace eliminates contamination

    NASA Technical Reports Server (NTRS)

    Geringer, H. J.

    1966-01-01

    METILUR /Materials Experimental Tungsten Induction Laboratory Unit Replacement/ is an improved, unitized design of a susceptor cup and shielding that uses only one type of construction material /tungsten/ which eliminates contamination. Cycling runs can be accomplished with METILUR.

  16. 75 FR 13320 - Florida Power Corporation, et al., Crystal River Unit 3 Nuclear Generating Plant; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... replacement outage that is currently underway at CR-3. In addition to steam generators, other large components (e.g., moisture separators and large heat exchangers) are being replaced during this outage... on the Internet at the NRC Web site: http://www.nrc.gov/reading-rm/adams.html . Persons who do not...

  17. A Three Degrees of Freedom Test-Bed for Nanosatellite and CubeSat Attitude Dynamics, Determination, and Control

    DTIC Science & Technology

    2009-12-01

    Tactical Imaging Nano-sat Yielding Small-Cost Operations and Persistent Earth-coverage UFO UHF Follow On UHF Ultra-High Frequency USCG United...replaced by UHF Follow On ( UFO ) satellites in the 1990s. The UFO satellites are being updated and scheduled for replacement by the Mobile User

  18. Mitochondrial Replacement Techniques: Divergence in Global Policy.

    PubMed

    Schandera, Johanna; Mackey, Tim K

    2016-07-01

    In 2015, the UK became the first country permitting the clinical application of mitochondrial replacement techniques (MRT). Here, we explore how MRT have led to diverging international policy. In response, we recommend focused regulatory efforts coupled with United Nations (UN) leadership to build international consensus on the future of MRT. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. Evaluation of non-native Tsuga species as replacements for T. canadensis killed by hemlock woolly adelgid

    Treesearch

    Paul A. Weston; Richard W. Harper

    2007-01-01

    Several species of Tsuga from the western United States and Asia are under evaluation as potential replacements for T. canadensis being destroyed by hemlock woolly adelgid (Adelges tsugae Annand). Test plots were established in Katonah, NY in October, 2003, and trees were inoculated with adelgid egg masses in...

  20. Enzyme replacement and substrate reduction therapy for Gaucher disease.

    PubMed

    Shemesh, Elad; Deroma, Laura; Bembi, Bruno; Deegan, Patrick; Hollak, Carla; Weinreb, Neal J; Cox, Timothy M

    2015-03-27

    Gaucher disease, a rare disorder, is caused by inherited deficiency of the enzyme glucocerebrosidase. It is unique among the ultra-orphan disorders in that four treatments are currently approved by various regulatory authorities for use in routine clinical practice. Hitherto, because of the relatively few people affected worldwide, many of whom started therapy during a prolonged period when there were essentially no alternatives to imiglucerase, these treatments have not been systematically evaluated in studies such as randomized controlled trials now considered necessary to generate the highest level of clinical evidence. To summarize all available randomized controlled study data on the efficacy and safety of enzyme replacement therapies and substrate reduction therapy for treating Gaucher disease. We searched the Cochrane Cystic Fibrosis and Genetic Disorders Group's Inborn Errors of Metabolism Trials Register. Additional searches were conducted on ClinicalTrials.gov for any ongoing studies with potential interim results, and through PubMed. We also searched the reference lists of relevant articles and reviews.Date of last search: 07 August 2014. All randomized and quasi-randomized controlled studies (including open-label studies and cross-over studies) assessing enzyme replacement therapy or substrate reduction therapy, or both, in all types of Gaucher disease were included. Two authors independently assessed the risk of bias in the included studies, and extracted relevant data. Of the 488 studies retrieved by the electronic searches, eight met the inclusion criteria and were analysed (300 participants). Response parameters were restricted to haemoglobin concentration, platelet count, spleen and liver volume and serum biomarkers (chitotriosidase and CCL18). Only one publication reported a 'low risk of bias' score in all parameters assessed, and all studies included were randomized.Four studies reported the responses to enzyme replacement therapy of previously untreated individuals with type 1 Gaucher disease. Two studies investigated maintenance enzyme replacement therapy in people with stable type 1 Gaucher disease previously treated for at least two years. One study compared substrate reduction therapy, enzyme replacement therapy and a combination thereof as maintenance therapy in people with type 1 Gaucher disease previously treated with enzyme replacement therapy. One study examined substrate reduction therapy in people with chronic neuronopathic (type 3) Gaucher disease who continued to receive enzyme replacement therapy.Treatment-naïve participants had similar increases in haemoglobin when comparing those receiving imiglucerase or alglucerase at 60 units/kg, imiglucerase or velaglucerase alfa at 60 U/kg, taliglucerase alfa at 30 units/kg or 60 units/kg, and velaglucerase alfa at 45 units/g or 60 units/kg. For platelet count response in participants with intact spleens, a benefit for imiglucerase over velaglucerase alfa at 60 units/kg was observed, mean difference -79.87 (95% confidence interval -137.57 to -22.17). There were no other significant differences in platelet count response when comparing different doses of velaglucerase alfa and of taliglucerase alfa, and when comparing imiglucerase to alglucerase. Spleen and liver volume reductions were not significantly different in any enzyme replacement therapy product or dose comparison study. Although a dose effect on serum biomarkers was not seen after nine months, a significantly greater reduction with higher dose was reported after 12 months in the velaglucerase study, mean difference 16.70 (95% confidence intervaI 1.51 to 31.89). In the two enzyme replacement therapy maintenance studies comparing infusions every two weeks and every four weeks, there were no significant differences in haemoglobin concentration, platelet count, and spleen and liver volumes over a 6 to 12 month period when participants were treated with the same cumulative dose.A total of 25 serious adverse events were reported, nearly all deemed unrelated to treatment.There are, as yet, no randomized trials of substrate reduction therapy in treatment-naïve patients that can be evaluated. Miglustat monotherapy appeared as effective as continued enzyme replacement therapy for maintenance of hematological, organ and biomarker responses in people with type 1 Gaucher disease previously treated with imiglucerase for at least two years. In those with neuronopathic Gaucher disease, no significant improvements in haemoglobin concentration, platelet count or organ volumes occurred when enzyme replacement therapy was augmented with miglustat.One randomized controlled study assessing substrate reduction therapy was published immediately prior to producing the final version of this review, and this, along with a further ongoing study (expected to be published in the near future), will be assessed for eligibility in a future update of the review. The results reflect the limitations of analysing evidence restricted to prospective randomized controlled trials, especially when dealing with chronic rare diseases. This analysis suggests that, during the first year of treatment, different recombinant glucocerebrosidases are bio-similar and non-inferior in safety and efficacy for surrogate biological response parameters. Enzyme replacement therapy given at 30 to 45 units/kg body weight every two to four weeks was generally as effective as the 60 unit/kg dose for the assessed clinical outcomes. The analysis emphasise the need to determine whether it is realistic to carry out multi-decade prospective clinical trials for rare diseases such as type 1 Gaucher disease. With large treatment effects on the classical manifestations of the disorder, therapeutic investigations in Gaucher disease mandate innovative trial designs and methodology to secure decisive data concerning long-term efficacy and safety - with the realization that knowledge about disease-modifying actions that are sustained are of crucial importance to people with this chronic condition.

  1. A Structured Professional Development Approach to Unit Study: The Experiences of 200 Teachers in a National Teacher Development Project.

    ERIC Educational Resources Information Center

    McColskey, Wendy; Parke, Helen; Furtak, Erin; Butler, Susan

    This article addresses what was learned through the National Computational Science Leadership Program about involving teachers in planning high quality units of instruction around computational science investigations. Two cohorts of roughly 25 teacher teams nationwide were given opportunities to develop "replacement units." The goal was to support…

  2. Hydrogen Fuel Cell on a Helicopter: A System Engineering Approach

    NASA Astrophysics Data System (ADS)

    Nesheiwat, Rod

    Hydrogen fuel cells have been previously investigated as a viable replacement to traditional gas turbine auxiliary power unit onboard fixed wing commercial jets. However, so far no study has attempted to extend their applicability to rotary wing aircrafts. To aid in the advancement of such innovative technologies, a holistic technical approach is required to ensure risk reduction and cost effectiveness throughout the product lifecycle. This paper will evaluate the feasibility of replacing a gas turbine auxiliary power unit on a helicopter with a direct hydrogen, air breathing, proton exchange membrane fuel cell, all while emphasizing a system engineering approach that utilize a specialized set of tools and artifacts.

  3. NASA Shuttle Logistics Depot (NSLD) - The application of ATE

    NASA Technical Reports Server (NTRS)

    Simpkins, Lorenz G.; Jenkins, Henry C.; Mauceri, A. Jack

    1990-01-01

    The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.

  4. ION SOURCE

    DOEpatents

    Brobeck, W.M.

    1959-04-14

    This patent deals with calutrons and more particularly to an arrangement therein whereby charged bottles in a calutron source unit may be replaced without admitting atmospheric air to the calutron vacuum chamber. As described, an ion unit is disposed within a vacuum tank and has a reservoir open toward a wall of the tank. A spike projects from thc source into the reservoir. When a charge bottle is placed in the reservoir, the spike breaks a frangible seal on the bottle. After the contents of the bottle are expended the bottle may be withdrawn and replaced with another charge bottle by a varuum lock arrangement in conjunction with an arm for manipulating the bottle.

  5. Ion source

    DOEpatents

    Brobeck, W. M.

    1959-04-14

    This patent deals with calutrons and more particularly to an arrangement therein whereby charged bottles in a calutron source unit may be replaced without admitting atmospheric air to the calutron vacuum chamber. As described, an ion unit is disposed within a vacuum tank and has a reservoir open toward a wall of the tank. A spike projects from the source into the reservoir. When a charge bottle is placed in the reservoir, the spike breaks a frangible seal on the bottle. After the contents of the bottle are expended the bottle may be withdrawn and replaced with another charge bottle by a vacuum lock arrangement in conjunction with an arm for manipulating the bottle.

  6. Has Embase replaced MEDLINE since coverage expansion?

    PubMed

    Lam, Michael Thomas; De Longhi, Christina; Turnbull, Joseph; Lam, Helen Rose; Besa, Reena

    2018-04-01

    The research tested the authors' hypothesis that more researchers from the academic medicine community in the United States and Canada with institutional access to Embase had started using Embase to replace MEDLINE since Embase was expanded in 2010 to cover all MEDLINE records. We contacted libraries of 140 and 17 medical schools in the United States and Canada, respectively, to confirm their subscriptions to Embase 5 years before and 5 years after 2010. We searched the names of institutions with confirmed Embase access in Ovid MEDLINE and Embase to retrieve works authored by affiliates of those institutions. We then examined 100 randomly selected records from each of the 5 years before and 5 years after the Embase coverage expansion in 2010. We hypothesized that studies that used Embase but not MEDLINE would increase due to the Embase coverage expansion. The number of studies that used Embase but not MEDLINE did not change between the pre-2010 and post-2010 periods. Our hypothesis was refuted. Studies that used Embase but not MEDLINE did not increase post-2010. Our results suggest the academic medicine community in the United States and Canada that had access did not use Embase to replace MEDLINE, despite the Embase coverage expansion.

  7. Understanding Skill in EVA Mass Handling. Volume 1; Theoretical and Operational Foundations

    NASA Technical Reports Server (NTRS)

    Riccio, Gary; McDonald, Vernon; Peters, Brian; Layne, Charles; Bloomberg, Jacob

    1997-01-01

    This report describes the theoretical and operational foundations for our analysis of skill in extravehicular mass handling. A review of our research on postural control, human-environment interactions, and exploratory behavior in skill acquisition is used to motivate our analysis. This scientific material is presented within the context of operationally valid issues concerning extravehicular mass handling. We describe the development of meaningful empirical measures that are relevant to a special class of nested control systems: manual interactions between an individual and the substantial environment. These measures are incorporated into a unique empirical protocol implemented on NASA's principal mass handling simulator, the precision air-bearing floor, in order to evaluate skill in extravehicular mass handling. We discuss the components of such skill with reference to the relationship between postural configuration and controllability of an orbital replacement unit, the relationship between orbital replacement unit control and postural stability, the relationship between antecedent and consequent movements of an orbital replacement unit, and the relationship between antecedent and consequent postural movements. Finally, we describe our expectations regarding the operational relevance of the empirical results as it pertains to extravehicular activity tools, training, monitoring, and planning.

  8. Should a coal-fired power plant be replaced or retrofitted?

    PubMed

    Patiño-Echeverri, Dalia; Morel, Benoit; Apt, Jay; Chen, Chao

    2007-12-01

    In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO2, NOx, Hg, and CO2 using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO2 and NOx, controls on the existing unit. An expectation that the CO2 price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power.

  9. First non-OEM steam-generator replacement in US a success

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hendsbee, P.M.; Lees, M.D.; Smith, J.C.

    1994-04-01

    In selecting replacements for major powerplant components, a fresh approach can be advantageous--even when complex nuclear components are involved. This was the experience at Unit 2 of Millstone nuclear station, which features an 870-MW pressurized-water reactor (PWR) with two nuclear recirculating steam generators. The unit began operation in 1975. In the early 1980s, pitting problems surfaced in the steam generator tubing; by the mid eighties, tube corrosion had reached an unacceptable level. Virtually all of the 17,000 tubes in the two units were deteriorating, with 2500 plugged and 5000 sleeved. Several new problems also were identified, including secondary-side circumferential crackingmore » of the Alloy 600 tubing near the tubesheet face, and deterioration of the carbon steel egg-crate tube supports. Despite improvements to primary and secondary steam-generator water chemistry, including almost complete copper removal from the condensate and feedwater loops, Northeast Utilities (NU) was unable to completely control degradation of the tube bundles. The utility decided in 1987 that full replacement was the most viable alternative. NU made a bold move, selecting a supplier other than the original equipment manufacturer (OEM).« less

  10. Recommendations for Enabling Manual Component Level Electronic Repair for Future Space Missions

    NASA Technical Reports Server (NTRS)

    Struk, Peter M.; Easton, John W.; Funk, Gregory P.; Latta, Gary S.; Ganster, Andrew W.; Estes, Brett E.

    2011-01-01

    Long duration missions to the Moon and Mars pose a number of challenges to mission designers, controllers, and the crews. Among these challenges are planning for corrective maintenance actions which often require a repair. Current repair strategies on the International Space Station (ISS) rely primarily on the use of Orbital Replacement Units (ORUs), where a faulty unit is replaced with a spare, and the faulty unit typically returns to Earth for analysis and possible repair. The strategy of replace to repair has posed challenges even for the ISS program. Repairing faulty hardware at lower levels such as the component level can help maintain system availability in situations where no spares exist and potentially reduce logistic resupply mass.This report provides recommendations to help enable manual replacement of electronics at the component-level for future manned space missions. The recommendations include hardware, tools, containment options, and crew training. The recommendations are based on the work of the Component Level Electronics Assembly Repair (CLEAR) task of the Exploration Technology Development Program from 2006 to 2009. The recommendations are derived based on the experience of two experiments conducted by the CLEAR team aboard the International Space Station as well as a group of experienced Miniature/Microminiature (2M) electronics repair technicians and instructors from the U.S. Navy 2M Project Office. The emphasis of the recommendations is the physical repair. Fault diagnostics and post-repair functional test are discussed in other CLEAR reports.

  11. TOTAL KNEE REPLACEMENT IN PATIENTS WITH BELOW-KNEE AMPUTATION

    PubMed Central

    Karam, Matthew D; Willey, Michael; Shurr, Donald G

    2010-01-01

    Total knee replacement (TKR) is reserved for patients with severe and disabling arthritis that is non-responsive to conservative measures. Based on existing data, total knee replacement is a safe and cost-effective treatment for alleviating pain and improving physical function in patients who do not respond to conservative therapy. Despite the large variation in health status of patients and types of prosthesis implanted, total knee replacement has proven to be a relatively low risk and successful operation. Each year in the United States surgeons perform approximately 300,000 TKR.1 Likewise, lower extremity amputation is commonly performed in the United States with an annual incidence of 110,000 per year.2 Nearly 70% of all lower extremity amputations are performed as the result of chronic vascular disease, followed by trauma (22%), congenital etiology and tumor (4% each).3 Approximately 50% of all lower extremity amputations are performed secondary to complications from Diabetes Mellitus. Norvell et al. demonstrated that patients who have previously undergone transtibial amputation and ambulate with a prosthesis are more likely to develop degenerative joint disease in the con-tralateral extremity than the ipsilateral extremity.4 Further, radiographic changes consistent with osteoporosis have been demonstrated in up to 88% of limbs that have undergone transtibial amputation.8 To our knowledge, there have been only three reported cases of total knee replacement in patients with ipsilateral transtibial amputation.5,7 The purpose of the present study is to review the existing data on total knee replacement in patients who have undergone transtibial amputation. Further we present a patient with a transtibial amputation who underwent contralateral total knee replacement. PMID:21045987

  12. 40 CFR 270.4 - Effect of a permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regarding leak detection systems for new and replacement surface impoundment, waste pile, and landfill units, and lateral expansions of surface impoundment, waste pile, and landfill units. The leak detection system requirements include double liners, CQA programs, monitoring, action leakage rates, and response...

  13. KSC-2012-6381

    NASA Image and Video Library

    2012-12-04

    CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida position the orbital replacement unit for the space station's main bus switching unit as they prepare to pack the unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser

  14. KSC-2012-6380

    NASA Image and Video Library

    2012-12-04

    CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida lift the orbital replacement unit for the space station's main bus switching unit as they prepare to pack the unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser

  15. Steam generator feedwater nozzle transition piece replacement experience at Salem Unit 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patten, D.B.; Perrin, J.S.; Roberts, A.T.

    Cracking of steam generator feedwater piping adjacent to the feedwater nozzles has been a recurring problem since 1979 at Salem Unit 1 owned and operated by Public Service Electric and Gas Company. In addition to the cracking problem, erosion-corrosion at the leading edge of the feedwater nozzle thermal sleeve was also observed in 1992. To provide a long-term solution for the pipe cracking and thermal sleeve erosion-corrosion problems, a unique transition piece forging was specially designed, fabricated, and installed for each of the four steam generators during the 1995 outage. This paper discusses the design, fabrication, and installation of themore » transition piece forgings at Salem Unit 1, and the experiences gained from this project. It is believed that these experiences may help other utilities when planning similar replacements in the future.« less

  16. Population Replacement and Immigrant Adaptation: New Issues Facing the West. Impact of Immigration in California, Policy Discussion Paper.

    ERIC Educational Resources Information Center

    Espenshade, Thomas J.

    The low fertility of Western industrial nations is likely to become a permanent condition; in the absence of immigration, populations with below-replacement fertility will eventually decline in size. But at the same time fertility is declining, international migration to the West is accelerating. Legal immigration to the United States rose from…

  17. Learner-Centered Instruction (LCI): Volume IV, The Simulated Maintenance Task Environment (SMTE): A Job Specific Simulator.

    ERIC Educational Resources Information Center

    Rifkin, Kenneth I.; And Others

    The purpose of the simulated maintenance task environment is to provide a means for training and job performance testing of the flight line weapon control systems mechanic/technician for the F-111A aircraft. It provides practice in flight line equipment checkout, troubleshooting, and removal and replacement of line replaceable units in the…

  18. Comparison of cropland and forest surface temperatures across the conterminous United States

    EPA Science Inventory

    Global climate models (GCM) investigating the effects of land cover on climate have found that replacing extra-tropical forest with cropland promotes cooling. We compared cropland and forest surface temperatures across the continental United States in 16 cells that were approxim...

  19. Heterogeneity in preferences for woody biomass energy in the US Mountain West

    Treesearch

    Robert M. Campbell; Tyron J. Venn; Nathaniel M. Anderson

    2018-01-01

    The United States has passed legislation aimed at reducing greenhouse gas emissions (United States Congress, 2005; United States Congress, 2007; EPA, 2015). In order to achieve the goals set by these commitments, significant amounts of fossil fuel energy will need to be replaced with renewable energy. There are multiple renewable technologies from which to choose, and...

  20. Greenhouse Gas Mitigation in Chinese Eco-Industrial Parks by Targeting Energy Infrastructure: A Vintage Stock Model.

    PubMed

    Guo, Yang; Tian, Jinping; Chertow, Marian; Chen, Lujun

    2016-10-03

    Mitigating greenhouse gas (GHG) emissions in China's industrial sector is crucial for addressing climate change. We developed a vintage stock model to quantify the GHG mitigation potential and cost effectiveness in Chinese eco-industrial parks by targeting energy infrastructure with five key measures. The model, integrating energy efficiency assessments, GHG emission accounting, cost-effectiveness analyses, and scenario analyses, was applied to 548 units of energy infrastructure in 106 parks. The results indicate that two measures (shifting coal-fired boilers to natural gas-fired boilers and replacing coal-fired units with natural gas combined cycle units) present a substantial potential to mitigate GHGs (42%-46%) compared with the baseline scenario. The other three measures (installation of municipal solid waste-to-energy units, replacement of small-capacity coal-fired units with large units, and implementation of turbine retrofitting) present potential mitigation values of 6.7%, 0.3%, and 2.1%, respectively. In most cases, substantial economic benefits also can be achieved by GHG emission mitigation. An uncertainty analysis showed that enhancing the annual working time or serviceable lifetime levels could strengthen the GHG mitigation potential at a lower cost for all of the measures.

  1. Implementation and evaluation of an automated dispensing system.

    PubMed

    Schwarz, H O; Brodowy, B A

    1995-04-15

    An institution's experience in replacing a traditional unit dose cassette-exchange system with an automated dispensing system is described. A 24-hour unit dose cassette-exchange system was replaced with an automated dispensing system (Pyxis's Medstation Rx) on a 36-bed cardiovascular surgery unit and an 8-bed cardiovascular intensive care unit. Significantly fewer missing doses were reported after Medstation Rx was implemented. No conclusions could be made about the impact of the system on the reporting of medication errors. The time savings for pharmacy associated with the filling, checking, and delivery of new medication orders equated to about 0.5 full-time equivalent (FTE). Medstation Rx also saved substantial nursing time for acquisition of controlled substances and for controlled-substance inventory taking at shift changes. A financial analysis showed that Medstation Rx could save the institution about $1 million over five years if all personnel time savings could be translated into FTE reductions. The automated system was given high marks by the nurses in a survey; 80% wanted to keep the system on their unit. Pilot implementation of an automated dispensing system improved the efficiency of drug distribution over that of the traditional unit dose cassette-exchange system.

  2. Overview of two story walkup flat type unit illustrating projecting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of two story walk-up flat type unit illustrating projecting balconies and concrete stairways. Original pipe railings replaced by square tube railing. Building 26, view facing east - Harbor Hills Housing Project, Two Story Walk-Up Type, 26607 Western Avenue, Lomita, Los Angeles County, CA

  3. Purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies of great cormorant (Phalacrocorax carbo) haemoglobin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jagadeesan, G.; Malathy, P.; Gunasekaran, K.

    2014-10-25

    The great cormorant hemoglobin has been isolated, purified and crystallized and the three dimensional structure is solved using molecular replacement technique. Haemoglobin is the iron-containing oxygen-transport metalloprotein that is present in the red blood cells of all vertebrates. In recent decades, there has been substantial interest in attempting to understand the structural basis and functional diversity of avian haemoglobins. Towards this end, purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies have been carried out on cormorant (Phalacrocorax carbo) haemoglobin. Crystals were grown by the hanging-drop vapour-diffusion method using PEG 3350, NaCl and glycerol as precipitants. The crystals belonged to themore » trigonal system P3{sub 1}21, with unit-cell parameters a = b = 55.64, c = 153.38 Å, β = 120.00°; a complete data set was collected to a resolution of 3.5 Å. Matthews coefficient analysis indicated that the crystals contained a half-tetramer in the asymmetric unit.« less

  4. Panoramic projection avionics displays

    NASA Astrophysics Data System (ADS)

    Kalmanash, Michael H.

    2003-09-01

    Avionics projection displays are entering production in advanced tactical aircraft. Early adopters of this technology in the avionics community used projection displays to replace or upgrade earlier units incorporating direct-view CRT or AMLCD devices. Typical motivation for these upgrades were the alleviation of performance, cost and display device availability concerns. In these systems, the upgraded (projection) displays were one-for-one form / fit replacements for the earlier units. As projection technology has matured, this situation has begun to evolve. The Lockheed-Martin F-35 is the first program in which the cockpit has been specifically designed to take advantage of one of the more unique capabilities of rear projection display technology, namely the ability to replace multiple small screens with a single large conformal viewing surface in the form of a panoramic display. Other programs are expected to follow, since the panoramic formats enable increased mission effectiveness, reduced cost and greater information transfer to the pilot. Some of the advantages and technical challenges associated with panoramic projection displays for avionics applications are described below.

  5. Projecting the need for hip replacement over the next three decades: influence of changing demography and threshold for surgery

    PubMed Central

    Birrell, F.; Johnell, O.; Silman, A.

    1999-01-01

    OBJECTIVES—To estimate the requirement for total hip replacement in the United Kingdom over the next three decades
METHODS—Projection of age and sex specific hip replacements in the UK over 10 year intervals taking account of demographic change and the extrapolation of arthroplasty rates from Sweden; a country with recently introduced guidelines.
RESULTS—Assuming no change in the age and sex specific arthroplasty rates, the estimated number of hip replacements will increase by 40% over the next 30 year period because of demographic change alone. The proportionate change will be substantially higher in men (51%) than women (33%), with a doubling of the number of male hip replacements in those aged over 85. Changes in the threshold for surgery may increase this further—up to double the current number.
CONCLUSION—A sharp rise in hip replacements will be needed to satisfy needs in the UK population over the next 30 years.

 PMID:10460191

  6. Metro U.S.A. Data Sheet: Population Estimates and Selected Demographic Indicators for the Metropolitan Areas of the United States. Special edition of the United States Population Data Sheet.

    ERIC Educational Resources Information Center

    Population Reference Bureau, Inc., Washington, DC.

    This poster-size data sheet presents population estimates and selected demographic indicators for the nation's 281 metropolitan areas. These areas are divided into 261 Metropolitan Statistical Areas (MSAs) and 20 Consolidated Metropolitan Statistical Areas (CMSAs), reporting units which replace the Standard Metropolitan Statistical Areas (SMSAs)…

  7. KSC-2012-6382

    NASA Image and Video Library

    2012-12-04

    CAPE CANAVERAL, Fla. -- Inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, workers have prepared the orbital replacement unit for the space station's main bus switching unit to be placed in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser

  8. KSC-2012-6378

    NASA Image and Video Library

    2012-12-04

    CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida prepare to pack the orbital replacement unit for the space station's main bus switching unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser

  9. KSC-2012-6379

    NASA Image and Video Library

    2012-12-04

    CAPE CANAVERAL, Fla. -- Workers inside the Space Station Processing Facility at NASA's Kennedy Space Center in Florida prepare to pack the orbital replacement unit for the space station's main bus switching unit in a shipping container. The unit, which was processed at Kennedy, will be shipped to Japan at the beginning of the year for the HTV-4 launch, which is currently scheduled for 2013. Photo credit: NASA/Charisse Nahser

  10. The United States Army’s Full-Spectrum Training Strategy Challenge

    DTIC Science & Technology

    2012-05-17

    the high operational tempo for deployed and deploying units. Soldiers and units conducted repeat deployments to both Iraq and Afghanistan with little...prevalent in Strategic Operational Design and associated variations of design. Further complicating Israeli ideas of warfare was the notion that...Army to develop an overarching operational framework that finally replaces Airland Battle, like EBO or some variation of operational design. But one

  11. SI units and the clinical practice of infectious diseases: application to the usage of antimicrobial agents.

    PubMed

    Quentzel, H L; Nadelman, R B; Ng, J; Wormser, G P

    1989-01-01

    Over the next few years, le Système international d'Unités or SI units may replace the presently used metric system in reporting laboratory data. The change to SI units will likely result in some confusion among clinicians who are not well versed in the new system. Application of SI units to the clinical practice of infectious diseases is discussed, including changes in drug dosages, serum drug levels, and minimum inhibitory concentrations. A table is presented to facilitate conversion of metric units to SI units and vice versa.

  12. 75 FR 27385 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... identifying mark, type of car, year built, number of windows and the estimated replacement glazing cost for...'s arguments in favor of relief. United Railroad Historical Society of New Jersey [Docket Number FRA-2010-0079] The United Railroad Historical Society of New Jersey (URHS) of Jackson, New Jersey, has...

  13. Clinical and Radiographic Assessment of Reasons for Replacement of Metal- Ceramic Fixed Dental Prostheses in Patients Referring to Dental School.

    PubMed

    Al Refai, Roa'a; Saker, Samah

    2018-01-01

    The expected length of service and reasons for fixed dental prostheses (FDPs) replacement are a frequent inquiry by patients while the answers were mainly based on studies reports that was conducted outside the middle east region. This clinical and radiographic survey was constructed to assess and survey clinically and radiographically the reasons of replacement of metal-ceramic fixed dental prostheses, amongst patients reporting at dental school in Taibah University. Between January and May 2016, 151 patients were recruited for this study. Interview (include questions pertained to the length of service of the prosthesis, the nature of complaint as told by patient in her own words), clinical examination, intra-oral photographs, and periapical radiographs, were done by the researchers. The parameters assessed were secondary caries, open margins, loss of retention, failure of endodontic treatment of the abutment and periodontal diseases. A total number of 249 failed fixed dental prostheses were evaluated. Of which 180 (39.7%) were single crowns, 159 (35.0%) were retainers and 117 (25.8%) were pontics in 69 fixed partial denture. The most common reason for replacement of fixed restorations was periodontal diseases affecting 92.8% of all types' restorations, followed by defective margin in 90.4% of examined restoration, poor aesthetic in 88% of restorations, while periapical involvement was found in 85.5% of fixed dental prosthesis. The survival rates of fixed prostheses were not predictable, and no association was found between number of years in service and the number of restorations. The most common reasons for replacing single unit fixed dental prostheses are periodontal diseases and periapical involvement, while defective margins and poor aesthetic mainly associated with multi-unit fixed dental prostheses. Key words: Failure, Fixed dental prosthesis, Survival, Replacement.

  14. VHSIC Electronics and the Cost of Air Force Avionics in the 1990s

    DTIC Science & Technology

    1990-11-01

    circuit. LRM Line replaceable module. LRU Line replaceable unit. LSI Large-scale integration. LSTTL Tow-power Schottky Transitor -to-Transistor Logic...displays, communications/navigation/identification, electronic combat equipment, dispensers, and computers. These CERs, which statistically relate the...some of the reliability numbers, and adding the F-15 and F-16 to obtain the data sample shown in Table 6. Both suite costs and reliability statistics

  15. A Procedure for Determining the Resource Utilization Potential of Coal Ash.

    DTIC Science & Technology

    1981-09-01

    48 V Chapter Page Lime Replacement for Flue - Gas Desulfurization Ujnits . .. .. .. .. .. .. .. .. .. .. . .48 Refuse Pile Fire Abatemnent...exceeds the capability of a vacuum system to attain a satisfactory conveying rate. If thenfy ash is removed from the flue gas stream by a wet collector...the mixture some fertilizer value (21:44-45). Lime Replacement for Flue - Gas Desulfurization Units For conventional SO, lime-based removal systems

  16. 26. Generator Voltage Regulator Cabinet Exterior for Unit 1, view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. Generator Voltage Regulator Cabinet Exterior for Unit 1, view to the northwest. The exciter supplies the DC current to the generator rotor to create electricity. Each of the four original units has an exciter identical to this one, and all are scheduled for replacement. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  17. Assessment of the Capability of the NGDS Prototype to Replace the JBAIDS for Environmental Sample Analysis

    DTIC Science & Technology

    2016-11-01

    FilmArray system. 15. SUBJECT TERMS BioFire FilmArray system Dry Filter Unit (DFU) Joint Biological...collectors, such as the Dry Filter Unit (DFU). The FilmArray system showed enormous potential to rapidly screen samples for a wide range of biological...specific focus on the efficient implementation of environmental detectors and collectors, such as Dry Filter Units (DFUs). The JUPITR ATD members

  18. Management of the patient with a total joint replacement: the primary care practitioner's role.

    PubMed

    Palmer, L M

    1999-01-01

    The primary care practitioner assumes chief responsibility for patients with arthritis. More than 40 million Americans experience some form of arthritis. Management of the patient with arthritis may include a referral to an orthopedic surgeon for surgical intervention. As estimated, up to 500,000 total joint replacement procedures are performed by orthopedic surgeons each year in the United States. Presurgical evaluation for a total joint replacement is imperative to ensure that the patient can safely undergo this surgical procedure. Postsurgical care of a patient with total joint replacement involves coordinating care with the physical therapist and orthopedic surgeon to ensure adequate follow-through with the recommended rehabilitation program, prophylactic antibiotic coverage, and observation for any complications including infection, deep-vein thrombosis, or loosening of the total-joint prosthesis.

  19. Contemporary Fertility Patterns and First-Birth Timing among Mexican-Origin Women

    ERIC Educational Resources Information Center

    Batson, Christie D.

    2013-01-01

    This article examines first-birth timing among Mexican women in the United States over two birth cohorts. Currently, Mexican women are one of a small group that maintains above-replacement fertility in the United States, contributing to both Mexican population growth and overall national population growth. Yet, the fertility timing of Mexican…

  20. The 1956 Suez Crisis and the United Nations

    DTIC Science & Technology

    2004-06-17

    formally given them the “ scarlet letter.” He then proceeds to describe the crisis as “the first time that permanent members of the Security Council had...less fanfare. Jubilant crowds of Egyptians replaced them. By midday on 23 December, the merriment reached a fevered pitch when units of the “defeated

  1. 77 FR 42653 - United States Navy Restricted Area, SUPSHIP Gulf Coast Detachment Mobile at AUSTAL, USA, Mobile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... restricted area established around the AUSTAL, USA shipbuilding facility located in Mobile, Alabama. The Supervisor of Shipbuilding, Conversion and Repair, United States Navy (USN), Gulf Coast (SUPSHIP Gulf Coast..., 2011, replacing the Supervisor of Shipbuilding, Conversion, and Repair, USN, Bath (SUPSHIP Bath). The...

  2. 76 FR 17362 - Airworthiness Directives; Bombardier, Inc. Model DHC-8-400 Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... elevator power control units (PCUs) where the shaft (tailstock) swaged bearing liners had shown a higher... on the elevator power control units (PCUs) where the shaft (tailstock) swaged bearing liners had...-play check of the shaft swaged bearing installed in the elevator PCU tailstock end and replacement of...

  3. 42 CFR 409.87 - Blood deductible.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...

  4. 42 CFR 409.87 - Blood deductible.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...

  5. 42 CFR 409.87 - Blood deductible.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...

  6. 42 CFR 409.87 - Blood deductible.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... after plasma is separated from whole blood. (2) A unit of packed red cells is treated as the equivalent...) Exception. The beneficiary is not responsible for the first 3 units of whole blood or packed red cells if.... In that case, the blood or red cells is deemed to have been replaced. (c) Provider's right to charge...

  7. Implementation of a timed, electronic, assessment-driven potassium-replacement protocol.

    PubMed

    Zielenski, Christopher; Crabtree, Adam; Le, Tien; Marlatt, Alyse; Ng, Dana; Tran, Alan

    2017-06-15

    The adherence to and effectiveness and safety of a timed, electronic, assessment-driven potassium-replacement protocol (TARP) were compared with an electronic nurse-driven replacement protocol (NRP) are reported. A retrospective observational study was conducted in a community hospital evaluating protocol adherence, effectiveness, and safety for 2 potassium-replacement protocols. All adults on medical units with an order for potassium replacement per protocol during the 3-month trial periods were reviewed. All patients requiring potassium replacement per protocol were included in the analysis. Adherence to the protocol was assessed by evaluating the dose of potassium administered and performance of reassessments. Effectiveness of the protocol was assessed by evaluating the time to achieve target potassium levels. Safety was assessed by evaluating the route of administration and occurrence of hyperkalemia. A total of 300 patients treated using potassium-replacement protocols required potassium replacement during the study period, with 148 patients in the NRP group requiring 491 instances of potassium replacement. In the TARP group a total of 564 instances requiring potassium replacement corresponded to 152 patients. Of the 491 instances requiring replacement in the NRP group, the correct dose was administered and reassessment performed 117 times (23.8%). Overall adherence ( p < 0.05), correct dose given ( p < 0.05), average time from blood draw to potassium replacement ( p < 0.0001), use of oral replacement ( p < 0.05), and time to achieve target potassium level within 12 hours ( p < 0.05) were significantly improved in the TARP group. The TARP improved the effectiveness and safety of potassium-replacement therapy over the traditional NRP without negatively affecting timeliness of care. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  8. KSC-99pp0242

    NASA Image and Video Library

    1999-02-25

    At Astrotech, Titusville, Fla., an umbrella-topped crane is secured to an ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on the International Space Station's Unity module for use during future ISS assembly missions. Gathered around the OTD and crane are (left to right) Ben Greene (kneeling), with Lockheed Martin; Michael Slataper, with Ratheon; Charles Franca, with Johnson Space Center; Robert Wilkes, with Lockheed Martin; Manfred Nordhoff (back to camera), with Daimler-Chrysler Aerospace (DASA); and Carl Figiel and Harald Schnier (far right), both with (DASA). The OTD will be attached to the nonpressurized International Cargo Carrier (ICC) in the background. The ICC fits inside the payload bay of the orbiter. The ICC will also carry the SPACEHAB Oceaneering Space System Box (SHOSS), a logistics items carrier. SHOSS can hold a maximum of 400 pounds of equipment and will carry items to be used during STS-96 and future ISS assembly flights. The ICC will fly on mission STS-96, targeted for launch on May 20

  9. KSC-99pp0349

    NASA Image and Video Library

    1999-03-25

    At Astrotech in Titusville, Fla., technicians with DaimlerChrysler Aerospace and RSC Energia of Korolev, Russia, maneuver a Russian cargo crane, the Strela, which is to be mounted to the exterior of the Russian station segment on the International Space Station (ISS). The Strehla has been the focus for two Shuttle crews, STS-96 who are at KSC for a Crew Equipment Interface Test, and STS-101, for payload familiarization. For the first time, STS-96 will include an Integrated Cargo Carrier (ICC) that will carry the Russian cargo crane; the SPACEHAB Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and a U.S.-built crane (ORU Transfer Device, or OTD) that will be stowed on the station for use during future ISS assembly missions. The ICC can carry up to 6,000 lb of unpressurized payload. It was built for SPACEHAB by DaimlerChrysler Aerospace and RSC Energia. STS-96 is targeted for launch on May 24 from Launch Pad 39B. STS-101 is scheduled to launch in early December 1999

  10. Interplay of structure and magnetism in ruthenocuprates: a Raman scattering and dilatometry study

    NASA Astrophysics Data System (ADS)

    Fainstein, A.; Ramos, C. A.; Pregliasco, R. G.; Butera, A.; Trodahl, H. J.; Williams, G. V. M.; Tallon, J. L.

    2002-07-01

    We present a Raman scattering and dilatometry study of polycrystalline samples of the magnetic superconducting ruthenocuprates RuSr 2Gd 2- xCe xCu 2O 10+ δ (RuGd 1222) and RuSr 2GdCu 2O 8 (RuGd 1212). In the Raman spectra a high-temperature diffusive-like laser-tail develops below the magnetic ordering temperature ( TM) into an underdamped peak which shifts up to ˜130 cm-1. A line assigned to O(Ru) phonons hardens, narrows and strengthens strongly below TM. Finally, a phonon peak appears below TM at ˜590 cm-1. These three magnetic-order-dependent features are observed for RuGd 1212 and for RuGd 1222 with x=1.0, but do not appear for x=0.5. Dilatometry measurements, on the other hand, evidence a change of the expansion coefficient at TM. These results point to a structural effect accompanying the magnetic order, and suggest a complex interplay of spin and lattice degrees of freedom in these ruthenocuprates.

  11. Expression, purification, crystallization and preliminary crystallographic study of isolated modules of the mouse coactivator-associated arginine methyltransferase 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Troffer-Charlier, Nathalie; Cura, Vincent; Hassenboehler, Pierre

    2007-04-01

    Isolated modules of mouse coactivator-associated arginine methyltransferase 1 encompassing the protein arginine N-methyltransferase catalytic domain have been overexpressed, purified and crystallized. X-ray diffraction data have been collected and have enabled determination of the structures by multiple isomorphous replacement using anomalous scattering. Coactivator-associated arginine methyltransferase 1 (CARM1) plays a crucial role in gene expression as a coactivator of several nuclear hormone receptors and also of non-nuclear receptor systems. Its recruitment by the transcriptional machinery induces protein methylation, leading to chromatin remodelling and gene activation. CARM1{sub 28–507} and two structural states of CARM1{sub 140–480} were expressed, purified and crystallized. Crystals of CARM1{submore » 28–507} belong to space group P6{sub 2}22, with unit-cell parameters a = b = 136.0, c = 125.3 Å; they diffract to beyond 2.5 Å resolution using synchrotron radiation and contain one monomer in the asymmetric unit. The structure of CARM1{sub 28–507} was solved by multiple isomorphous replacement and anomalous scattering methods. Crystals of apo CARM1{sub 140–480} belong to space group I222, with unit-cell parameters a = 74.6, b = 99.0, c = 207.4 Å; they diffract to beyond 2.7 Å resolution and contain two monomers in the asymmetric unit. Crystals of CARM1{sub 140–480} in complex with S-adenosyl-l-homocysteine belong to space P2{sub 1}2{sub 1}2, with unit-cell parameters a = 74.6, b = 98.65, c = 206.08 Å; they diffract to beyond 2.6 Å resolution and contain four monomers in the asymmetric unit. The structures of apo and holo CARM1{sub 140–480} were solved by molecular-replacement techniques from the structure of CARM1{sub 28–507}.« less

  12. Use of mock-up training to reduce personnel exposure at the North Anna Unit 1 Steam Generator Replacement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henry, H.G.; Reilly, B.P.

    1995-03-01

    The North Anna Power Station is located on the southern shore of Lake Anna in Louisa County, approximately forty miles northwest of Richmond, Virginia. The two 910 Mw nuclear units located on this site are owned by Virginia Electric and Power Company (Virginia Power) and Old Dominion Electric Cooperative and operated by Virginia Power. Fuel was loaded into Unit 1 in December 1977, and it began commercial operation in June 1978. Fuel was loaded into Unit 2 in April 1980 and began commercial operation in December 1980. Each nuclear unit includes a three-coolant-loop pressurized light water reactor nuclear steam supplymore » system that was furnished by Westinghouse Electric Corporation. Included within each system were three Westinghouse Model 51 steam generators with alloy 600, mill-annealed tubing material. Over the years of operation of Unit 1, various corrosion-related phenomena had occurred that affected the steam generators tubing and degraded their ability to fulfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators tubing and degraded their ability to fullfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators would not last their design life and must be repaired. To this end Virginia Power determined that a steam generator replacement (SGR) program was necessary to remove the old steam generator tube bundles and lower shell sections, including the channel heads (collectively called the lower assemblies), and replace them with new lower assemblies incorporating design features that will prevent the degradation problems that the old steam generators had experienced.« less

  13. Bleacher Comforts.

    ERIC Educational Resources Information Center

    Scandrett, Donald G.

    1998-01-01

    Examines the planning issues when replacing telescoping bleacher units and for analyzing seating options. Adresses the importance of complying with local building codes and the considerations on maintenance following installation. (GR)

  14. Increased calcium supplementation is associated with morbidity and mortality in the infant postoperative cardiac patient.

    PubMed

    Dyke, Peter C; Yates, Andrew R; Cua, Clifford L; Hoffman, Timothy M; Hayes, John; Feltes, Timothy F; Springer, Michelle A; Taeed, Roozbeh

    2007-05-01

    The purpose of this study was to assess the association of calcium replacement therapy with morbidity and mortality in infants after cardiac surgery involving cardiopulmonary bypass. Retrospective chart review. The cardiac intensive care unit at a tertiary care children's hospital. Infants undergoing cardiac surgery involving cardiopulmonary bypass between October 2002 and August 2004. None. Total calcium replacement (mg/kg calcium chloride given) for the first 72 postoperative hours was measured. Morbidity and mortality data were collected. The total volume of blood products given during the first 72 hrs was recorded. Infants with confirmed chromosomal deletions at the 22q11 locus were noted. Correlation and logistic regression analyses were used to generate odds ratios and 95% confidence intervals, with p < .05 being significant. One hundred seventy-one infants met inclusion criteria. Age was 4 +/- 3 months and weight was 4.9 +/- 1.7 kg at surgery. Six infants had deletions of chromosome 22q11. Infants who weighed less required more calcium replacement (r = -.28, p < .001). Greater calcium replacement correlated with a longer intensive care unit length of stay (r = .27, p < .001) and a longer total hospital length of stay (r = .23, p = .002). Greater calcium replacement was significantly associated with morbidity (liver dysfunction [odds ratio, 3.9; confidence interval, 2.1-7.3; p < .001], central nervous system complication [odds ratio, 1.8; confidence interval, 1.1-3.0; p = .02], infection [odds ratio, 1.5; confidence interval, 1.0-2.2; p < .04], extracorporeal membrane oxygenation [odds ratio, 5.0; confidence interval, 2.3-10.6; p < .001]) and mortality (odds ratio, 5.8; confidence interval, 5.8-5.9; p < .001). Greater calcium replacement was not associated with renal insufficiency (odds ratio, 1.5; confidence interval, 0.9-2.3; p = .07). Infants with >1 sd above the mean of total calcium replacement received on average fewer blood products than the total study population. Greater calcium replacement is associated with increasing morbidity and mortality. Further investigation of the etiology and therapy of hypocalcemia in this population is warranted.

  15. Portable Hydraulic Powerpack

    NASA Technical Reports Server (NTRS)

    Anderson, L. A.; Henry, R. L.; Fedor, O. H.; Owens, L. J.

    1986-01-01

    Rechargeable hydraulic powerpack functions as lightweight, compact source of mechanical energy. Self-contained hydraulic powerpack derives energy from solid chemical charge. Combustion of charge initiated by small hammer, and revolving feeder replaces charges expended. Combustion gases cool during expansion in turbine and not too hot for release to atmosphere. Unit has applications driving wheelchairs and operating drills, winches, and other equipment in remote areas. Also replaces electric motors and internal-combustion engines as source of power in explosive atmospheres.

  16. A Case Study of Internet Protocol Telephony (IPT) Implementation at United States Coast Guard Headquarters

    DTIC Science & Technology

    2005-03-01

    conversations over data networks . Many organizations are replacing portions of their traditional phone systems to gain the benefits of cost savings and...relevant to the Coast Guard. It includes the discussion of the public switched telephone network , an overview of IPT, IPT security issues, the...transmitting voice conversations over data networks . Many organizations are replacing portions of their traditional phone systems to gain the benefits of

  17. The optimal hormonal replacement modality selection for multiple organ procurement from brain-dead organ donors

    PubMed Central

    Mi, Zhibao; Novitzky, Dimitri; Collins, Joseph F; Cooper, David KC

    2015-01-01

    The management of brain-dead organ donors is complex. The use of inotropic agents and replacement of depleted hormones (hormonal replacement therapy) is crucial for successful multiple organ procurement, yet the optimal hormonal replacement has not been identified, and the statistical adjustment to determine the best selection is not trivial. Traditional pair-wise comparisons between every pair of treatments, and multiple comparisons to all (MCA), are statistically conservative. Hsu’s multiple comparisons with the best (MCB) – adapted from the Dunnett’s multiple comparisons with control (MCC) – has been used for selecting the best treatment based on continuous variables. We selected the best hormonal replacement modality for successful multiple organ procurement using a two-step approach. First, we estimated the predicted margins by constructing generalized linear models (GLM) or generalized linear mixed models (GLMM), and then we applied the multiple comparison methods to identify the best hormonal replacement modality given that the testing of hormonal replacement modalities is independent. Based on 10-year data from the United Network for Organ Sharing (UNOS), among 16 hormonal replacement modalities, and using the 95% simultaneous confidence intervals, we found that the combination of thyroid hormone, a corticosteroid, antidiuretic hormone, and insulin was the best modality for multiple organ procurement for transplantation. PMID:25565890

  18. A stand-replacing fire history in upper montane forests of the southern Rocky Mountains

    USGS Publications Warehouse

    Margolis, E.Q.; Swetnam, T.W.; Allen, Craig D.

    2007-01-01

    Dendroecological techniques were applied to reconstruct stand-replacing fire history in upper montane forests in northern New Mexico and southern Colorado. Fourteen stand-replacing fires were dated to 8 unique fire years (1842–1901) using four lines of evidence at each of 12 sites within the upper Rio Grande Basin. The four lines of evidence were (i) quaking aspen (Populus tremuloides Michx.) inner-ring dates, (ii) fire-killed conifer bark-ring dates, (iii) tree-ring width changes or other morphological indicators of injury, and (iv) fire scars. The annual precision of dating allowed the identification of synchronous stand-replacing fire years among the sites, and co-occurrence with regional surface fire events previously reconstructed from a network of fire scar collections in lower elevation pine forests across the southwestern United States. Nearly all of the synchronous stand-replacing and surface fire years coincided with severe droughts, because climate variability created regional conditions where stand-replacing fires and surface fires burned across ecosystems. Reconstructed stand-replacing fires that predate substantial Anglo-American settlement in this region provide direct evidence that stand-replacing fires were a feature of high-elevation forests before extensive and intensive land-use practices (e.g., logging, railroad, and mining) began in the late 19th century.

  19. Shopping around for hospital services: a comparison of the United States and Canada.

    PubMed

    Bell, C M; Crystal, M; Detsky, A S; Redelmeier, D A

    1998-04-01

    Historical comparisons indicate that US hospitals are more expensive than Canadian hospitals, but health care system reform might have changed the relative costs and timeliness of health care in the 2 countries. To estimate the price and convenience of selected hospital services in the United States and Canada for patients in 1997 had they paid out-of-pocket. Cross-sectional telephone survey conducted May 1996 to April 1997. The 2 largest acute care general hospitals from every city in the United States and Canada with a population greater than 500000. Each hospital was telephoned and asked their price and waiting time for 7 services: magnetic resonance imaging of the head without gadolinium; a screening mammogram; a 12-lead electrocardiogram; a prothrombin time measurement; a session of hemodialysis; a screening colonoscopy; and a total knee replacement. Waiting times were measured in days until earliest appointment and charges were converted to American currency. Overall, 48 US and 18 Canadian hospitals were surveyed. Median waiting times were significantly shorter in American hospitals for 4 services, particularly a magnetic resonance imaging of the head (3 days vs 150 days; P<.001). Median charges were significantly higher in American hospitals for 6 services, particularly for a total knee replacement ($26805 vs $10651; P<.001). Individual services showed no association between shorter waiting times and higher prices within each country, with the exception of a total knee replacement in the United States. US hospitals still provide higher prices and faster care than Canadian hospitals for patients who pay out-of-pocket.

  20. Delay in onset of metabolic alkalosis during regional citrate anti-coagulation in continuous renal replacement therapy with calcium-free replacement solution.

    PubMed

    See, Kay Choong; Lee, Margaret; Mukhopadhyay, Amartya

    2009-01-01

    Regional citrate anti-coagulation for continuous renal replacement therapy chelates calcium to produce the anti- coagulation effect. We hypothesise that a calcium-free replacement solution will require less citrate and produce fewer metabolic side effects. Fifty patients, in a Medical Intensive Care Unit of a tertiary teaching hospital (25 in each group), received continuous venovenous hemofiltration using either calcium-containing or calcium-free replacement solutions. Both groups had no significant differences in filter life, metabolic alkalosis, hypernatremia, hypocalcemia, and hypercalcemia. However, patients using calcium-containing solution developed metabolic alkalosis earlier, compared to patients using calcium-free solution (mean 24.6 hours,CI 0.8-48.4 vs. 37.2 hours, CI 9.4-65, P = 0.020). When calcium-containing replacement solution was used, more citrate was required (mean 280 ml/h, CI 227.2-332.8 vs. 265 ml/h, CI 203.4-326.6, P = 0.069), but less calcium was infused (mean 21.2 ml/h, CI 1.2-21.2 vs 51.6 ml/h, CI 26.8-76.4, P < or = 0.0001).

  1. Dipolar-dephasing 13C NMR studies of decomposed wood and coalified xylem tissue: Evidence for chemical structural changes associated with defunctionalization of lignin structural units during coalification

    USGS Publications Warehouse

    Hatcher, P.G.

    1988-01-01

    A series of decomposed and coalified gymnosperm woods was examined by conventional solid-state 13C nuclear magnetic resonance (NMR) and by dipolar-dephasing NMR techniques. The results of these NMR studies for a histologically related series of samples provide clues as to the nature of codification reactions that lead to the defunctionalization of lignin-derived aromatic structures. These reactions sequentially involve the following: (1) loss of methoxyl carbons from guaiacyl structural units with replacement by hydroxyls and increased condensation; (2) loss of hydroxyls or aryl ethers with replacement by hydrogen as rank increases from lignin to high-volatile bituminous coal; (3) loss of alkyl groups with continued replacement by hydrogen. The dipolar-dephasing data show that the early stages of coalification in samples examined (lignin to lignite) involve a decreasing degree of protonation on aromatic rings and suggest that condensation is significant during coalification at this early stage. An increasing degree of protonation on aromatic rings is observed as the rank of the sample increases from lignite to anthracite.

  2. Maternal cfDNA screening for Down syndrome--a cost sensitivity analysis.

    PubMed

    Cuckle, Howard; Benn, Peter; Pergament, Eugene

    2013-07-01

    This study aimed to determine the principal factors contributing to the cost of avoiding a birth with Down syndrome by using cell-free DNA (cfDNA) to replace conventional screening. A range of unit costs were assigned to each item in the screening process. Detection rates were estimated by meta-analysis and modeling. The marginal cost associated with the detection of additional cases using cfDNA was estimated from the difference in average costs divided by the difference in detection. The main factor was the unit cost of cfDNA testing. For example, replacing a combined test costing $150 with 3% false-positive rate and invasive testing at $1000, by cfDNA tests at $2000, $1500, $1000, and $500, the marginal cost is $8.0, $5.8, $3.6, and $1.4m, respectively. Costs were lower when replacing a quadruple test and higher for a 5% false-positive rate, but the relative importance of cfDNA unit cost was unchanged. A contingent policy whereby 10% to 20% women were selected for cfDNA testing by conventional screening was considerably more cost-efficient. Costs were sensitive to cfDNA uptake. Universal cfDNA screening for Down syndrome will only become affordable by public health purchasers if costs fall substantially. Until this happens, the contingent use of cfDNA is recommended. © 2013 John Wiley & Sons, Ltd.

  3. Cross-calibration of Fuji TR image plate and RAR 2492 x-ray film to determine the response of a DITABIS Super Micron image plate scanner

    NASA Astrophysics Data System (ADS)

    Dunham, G.; Harding, E. C.; Loisel, G. P.; Lake, P. W.; Nielsen-Weber, L. B.

    2016-11-01

    Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity applied to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.

  4. Cross-calibration of Fuji TR image plate and RAR 2492 x-ray film to determine the response of a DITABIS Super Micron image plate scanner

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunham, G., E-mail: gsdunha@sandia.gov; Harding, E. C.; Loisel, G. P.

    Fuji TR image plate is frequently used as a replacement detector medium for x-ray imaging and spectroscopy diagnostics at NIF, Omega, and Z facilities. However, the familiar Fuji BAS line of image plate scanners is no longer supported by the industry, and so a replacement scanning system is needed. While the General Electric Typhoon line of scanners could replace the Fuji systems, the shift away from photo stimulated luminescence units to 16-bit grayscale Tag Image File Format (TIFF) leaves a discontinuity when comparing data collected from both systems. For the purposes of quantitative spectroscopy, a known unit of intensity appliedmore » to the grayscale values of the TIFF is needed. The DITABIS Super Micron image plate scanning system was tested and shown to potentially rival the resolution and dynamic range of Kodak RAR 2492 x-ray film. However, the absolute sensitivity of the scanner is unknown. In this work, a methodology to cross calibrate Fuji TR image plate and the absolutely calibrated Kodak RAR 2492 x-ray film is presented. Details of the experimental configurations used are included. An energy dependent scale factor to convert Fuji TR IP scanned on a DITABIS Super Micron scanner from 16-bit grayscale TIFF to intensity units (i.e., photons per square micron) is discussed.« less

  5. Authentic Science in Education: Studies in Course-Based Research at the United States Military Academy

    ERIC Educational Resources Information Center

    Chase, Anthony M.

    2016-01-01

    This dissertation consists of two studies at the United States Military Academy. Both studies involve the use of Course-based Undergraduate Research Experiences (CUREs). These experiences give students the ability to engage in undergraduate research at an early point in their academic career by replacing traditional laboratory activities with…

  6. Comparison of cropland and forest surface temperatures across the conterminous United States

    Treesearch

    James D. Wickham; Timothy G. Wade; Kurt H. Riitters

    2012-01-01

    Global climate models (GCM) investigating the effects of land cover on climate have found that replacing extra-tropical forest with cropland promotes cooling. We compared cropland and forest surface temperatures across the continental United States in 16 cells that were approximately 1◦ × 2◦ using 1 km2 MODIS land surface...

  7. The Joint Operating Agreement: A Marvelous Machine with Damned Tight Steering.

    ERIC Educational Resources Information Center

    Pilgrim, Tim A.; Simpson, Roger

    The Newspaper Preservation Act of 1970 is frequently viewed as a legislative device for averting the failure of a competing metropolitan daily newspaper and is said to create, for the formerly competing newspapers, a monolithic management unit which enjoys advantages over the two publishing units it replaces. A study examined one of those…

  8. 75 FR 2055 - Airworthiness Directives; Fokker Services B.V. Model F.28 Mark 0070 and 0100 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... include inspecting the backlash remover of the elevator booster control unit to determine the displacement... measurement of the displacement, the compliance time for replacement ranges from before further flight to 3... of the elevator booster control unit to determine the displacement of the pivot bolt; and if...

  9. Health Service Inpatient Units for People with Intellectual Disabilities and Challenging Behaviour or Mental Health Problems

    ERIC Educational Resources Information Center

    Mansell, Jim; Ritchie, Fiona; Dyer, Ricinda

    2010-01-01

    Background: As institutions for people with intellectual disabilities have been replaced with community services, health care provision has developed to provide assessment and treatment, low and medium secure units for people with challenging behaviour or mental health problems. These include both public and private sector provision. Little is…

  10. 40 CFR 96.71 - Initial certification and recertification procedures

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: replacement of the analyzer, change in location or orientation of the sampling probe or site, or changing of... basis under § 96.74(d); (i) For a unit that has commences operation before its compliance deadline under... control period basis under § 96.74(b)(3)(ii) of this part: (i) For a unit that commenced operation before...

  11. Quantifying the multi-scale response of avifauna to prescribed fire experiments in the southwest United States

    Treesearch

    Brett G. Dickson; Barry R. Noon; Curtis H. Flather; Stephanie Jentsch; William M. Block

    2009-01-01

    Landscape-scale disturbance events, including ecological restoration and fuel reduction activities, can modify habitat and affect relationships between species and their environment. To reduce the risk of uncharacteristic stand-replacing fires in the southwestern United States, land managers are implementing restoration and fuels treatments (e.g., mechanical thinning,...

  12. Hadfield and Marshburn during HRCS Ku Comm Unit 2 Installation

    NASA Image and Video Library

    2013-04-02

    ISS035-E-013783 (2 April 2013) --- In the U.S. lab Destiny on the International Space Station, Expedition 35 Commander Chris Hadfield (right) and Flight Engineer Tom Marshburn remove the Video Baseband Signal Processor (VBSP) in order to replace it with a new Ku communication unit and its associated data and Ethernet cabling.

  13. Hadfield and Marshburn during HRCS Ku Comm Unit 2 Installation

    NASA Image and Video Library

    2013-04-02

    ISS035-E-013790 (2 April 2013) --- In the U.S. lab Destiny on the International Space Station, Expedition 35 Commander Chris Hadfield (background) and Flight Engineer Tom Marshburn remove the Video Baseband Signal Processor (VBSP) in order to replace it with a new Ku communication unit and its associated data and Ethernet cabling.

  14. 3D vision upgrade kit for TALON robot

    NASA Astrophysics Data System (ADS)

    Edmondson, Richard; Vaden, Justin; Hyatt, Brian; Morris, James; Pezzaniti, J. Larry; Chenault, David B.; Tchon, Joe; Barnidge, Tracy; Kaufman, Seth; Pettijohn, Brad

    2010-04-01

    In this paper, we report on the development of a 3D vision field upgrade kit for TALON robot consisting of a replacement flat panel stereoscopic display, and multiple stereo camera systems. An assessment of the system's use for robotic driving, manipulation, and surveillance operations was conducted. The 3D vision system was integrated onto a TALON IV Robot and Operator Control Unit (OCU) such that stock components could be electrically disconnected and removed, and upgrade components coupled directly to the mounting and electrical connections. A replacement display, replacement mast camera with zoom, auto-focus, and variable convergence, and a replacement gripper camera with fixed focus and zoom comprise the upgrade kit. The stereo mast camera allows for improved driving and situational awareness as well as scene survey. The stereo gripper camera allows for improved manipulation in typical TALON missions.

  15. Trends in Educational Attainment by Race/Ethnicity, Nativity, and Sex in the United States, 1989–2005

    PubMed Central

    EVERETT, BETHANY G.; ROGERS, RICHARD G.; HUMMER, ROBERT A.; KRUEGER, PATRICK M.

    2012-01-01

    Despite the importance of education for shaping individuals’ life chances, little research has examined trends and differences in educational attainment for detailed demographic subpopulations in the United States. We use labor market segmentation and cohort replacement theories, linear regression methods, and data from the National Health Interview Survey to understand educational attainment by race/ethnicity, nativity, birth cohort, and sex between 1989 and 2005 in the United States. There have been significant changes in educational attainment over time. In support of the cohort replacement theory, we find that across cohorts, females have enjoyed greater gains in education than men, and for some race/ethnic groups, recent cohorts of women average more years of education than comparable men. And in support of labor market segmentation theories, foreign-born Mexican Americans continue to possess relatively low levels of educational attainment. Our results can aid policymakers in identifying vulnerable populations, and form the base from which to better understand changing disparities in education. PMID:22649275

  16. Flywheel Energy Storage System Designed for the International Space Station

    NASA Technical Reports Server (NTRS)

    Delventhal, Rex A.

    2002-01-01

    Following successful operation of a developmental flywheel energy storage system in fiscal year 2000, researchers at the NASA Glenn Research Center began developing a flight design of a flywheel system for the International Space Station (ISS). In such an application, a two-flywheel system can replace one of the nickel-hydrogen battery strings in the ISS power system. The development unit, sized at approximately one-eighth the size needed for ISS was run at 60,000 rpm. The design point for the flight unit is a larger composite flywheel, approximately 17 in. long and 13 in. in diameter, running at 53,000 rpm when fully charged. A single flywheel system stores 2.8 kW-hr of useable energy, enough to light a 100-W light bulb for over 24 hr. When housed in an ISS orbital replacement unit, the flywheel would provide energy storage with approximately 3 times the service life of the nickel-hydrogen battery currently in use.

  17. Installation of new Generation General Purpose Computer (GPC) compact unit

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In the Kennedy Space Center's (KSC's) Orbiter Processing Facility (OPF) high bay 2, Spacecraft Electronics technician Ed Carter (right), wearing clean suit, prepares for (26864) and installs (26865) the new Generation General Purpose Computer (GPC) compact IBM unit in Atlantis', Orbiter Vehicle (OV) 104's, middeck avionics bay as Orbiter Systems Quality Control technician Doug Snider looks on. Both men work for NASA contractor Lockheed Space Operations Company. All three orbiters are being outfitted with the compact IBM unit, which replaces a two-unit earlier generation computer.

  18. Oxygen enhanced switching to combustion of lower rank fuels

    DOEpatents

    Kobayashi, Hisashi; Bool, III, Lawrence E.; Wu, Kuang Tsai

    2004-03-02

    A furnace that combusts fuel, such as coal, of a given minimum energy content to obtain a stated minimum amount of energy per unit of time is enabled to combust fuel having a lower energy content, while still obtaining at least the stated minimum energy generation rate, by replacing a small amount of the combustion air fed to the furnace by oxygen. The replacement of oxygen for combustion air also provides reduction in the generation of NOx.

  19. Welfare: Reform or Replacement? (Child Support Enforcement---II). Hearing before the Subcommittee on Social Security and Family Policy of the Committee on Finance. United States Senate, One Hundredth Congress, First Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Finance.

    This transcript is from the third in a series of hearings before the Senate Subcommittee on Social Security and Family Policy focusing on whether the present welfare system should be reformed or replaced. A series of public officials, child and family advocates, and other interested parties testified on the issue of enforcement of child support…

  20. Conceptual design of 100 TW solid state laser system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McMordie, J.A.

    1995-12-31

    Currently the main solid state laser facilities used for plasma physics research in the United Kingdom are the VULCAN laser at the Rutherford Appleton Laboratory and the HELEN facility at the Atomic Weapons Establishment. In the future it is proposed to replace HELEN with a new 100 TW facility to come on line early in the next century. A brief review is given of the VULCAN and HELEN. Then the authors discuss the design for the HELEN replacement.

  1. [Mobile single-pass batch hemodialysis system in intensive care medicine. Reduction of costs and workload in renal replacement therapy].

    PubMed

    Hopf, H-B; Hochscherf, M; Jehmlich, M; Leischik, M; Ritter, J

    2007-07-01

    This paper describes the introduction of a single-pass batch hemodialysis system for renal replacement therapy in a 14 bed intensive care unit. The goals were to reduce the workload of intensive care unit physicians using an alternative and simpler method compared to continuous veno-venous hemodiafiltration (CVVHDF) and to reduce the costs of hemofiltrate solutions (80,650 EUR per year in our clinic in 2005). We describe and evaluate the process of implementation of the system as well as the achieved and prospective savings. We conclude that a close cooperation of all participants (physicians, nurses, economists, technicians) of a hospital can achieve substantial benefits for patients and employees as well as reduce the economic burden of a hospital.

  2. HiL simulation in biomechanics: a new approach for testing total joint replacements.

    PubMed

    Herrmann, Sven; Kaehler, Michael; Souffrant, Robert; Rachholz, Roman; Zierath, János; Kluess, Daniel; Mittelmeier, Wolfram; Woernle, Christoph; Bader, Rainer

    2012-02-01

    Instability of artificial joints is still one of the most prevalent reasons for revision surgery caused by various influencing factors. In order to investigate instability mechanisms such as dislocation under reproducible, physiologically realistic boundary conditions, a novel test approach is introduced by means of a hardware-in-the-loop (HiL) simulation involving a highly flexible mechatronic test system. In this work, the underlying concept and implementation of all required units is presented enabling comparable investigations of different total hip and knee replacements, respectively. The HiL joint simulator consists of two units: a physical setup composed of a six-axes industrial robot and a numerical multibody model running in real-time. Within the multibody model, the anatomical environment of the considered joint is represented such that the soft tissue response is accounted for during an instability event. Hence, the robot loads and moves the real implant components according to the information provided by the multibody model while transferring back the position and resisting moment recorded. Functionality of the simulator is proved by testing the underlying control principles, and verified by reproducing the dislocation process of a standard total hip replacement. HiL simulations provide a new biomechanical testing tool for analyzing different joint replacement systems with respect to their instability behavior under realistic movements and physiological load conditions. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  3. A review of alternatives to di (2-ethylhexyl) phthalate-containing medical devices in the neonatal intensive care unit

    PubMed Central

    Van Vliet, EDS; Reitano, EM; Chhabra, JS; Bergen, GP; Whyatt, RM

    2012-01-01

    Objective To conduct an extensive literature and toxicological database review on substitute compounds and available alternative medical products to replace polyvinyl chloride (PVC) and/or di(2-ethylhexyl) phthalate (DEHP), and conduct a DEHP-medical inventory analysis at a large metropolitan neonatal intensive care unit (NICU). Study Design A systematic search for DEHP-free alternative products was performed using online databases. An informal audit of a large metropolitan NICU was undertaken in 2005 and 2006; 21 products were identified that could potentially contain DEHP. Availability of DEHP-free alternatives was determined through company websites and phone interviews. Result Two alternative approaches are available for replacing DEHP in NICU medical products: (1) replacement by DEHP-free plasticizers; and (2) replacement of PVC entirely through the use of other polymers. Both approaches seem to provide less harmful substitutes to DEHP, but support PVC-free polymers as the preferred alternative. However, significant data gaps exist, particularly for the alternative polymers. In all, 10 out of 21 (48%) products in the NICU audit were DEHP-free; six consisted of alternative polymers and four of alternative plasticizers. Of the remaining 11 products, only three were available without DEHP at the time of the audit. Conclusion Because of significant data gaps, systematic toxicological testing of DEHP-free alternatives is imperative. Continued development of alternative products is also needed. PMID:21311501

  4. A System Approach to Navy Medical Education and Training. Appendix 24. Equipment Repair Technician.

    DTIC Science & Technology

    1974-08-31

    DENTAL SYRINGE 40 lCORRECT MALFUNCTIONING RETRACTION MECHANISM ON DENTAL UNIT 41 1ADJUST DRIP RATE ON AIR-DRIVEN DENTAL HANDPIECE 42 ICLEAN VALVE... DENTAL UNIT 46 CLEAN/REPLACE WATER FILTER ELEMENTS ON DENTAL UNIT 47 ICLEAR WATER LINES ON CONTRA-ANGLE AIR-DRIVEN DENTAL HANDPIECE 48 IREPLACE WORN...GASKETS ON AIR-DRIVEN DENTAL HANDPIECE 49 IADJUST END PLAY ON DENTAL HANOPIECE so ICLEAN AND REASSEMBLE BELT-DRIVEN DENTAL HANDPIECE TURN

  5. Development of Protection and Control Unit for Distribution Substation

    NASA Astrophysics Data System (ADS)

    Iguchi, Fumiaki; Hayashi, Hideyuki; Takeuchi, Motohiro; Kido, Mitsuyasu; Kobayashi, Takashi; Yanaoka, Atsushi

    The Recently, electronics and IT technologies have been rapidly innovated and have been introduced to power system protection & control system to achieve high reliability, maintainability and more functionality. Concerning the distribution substation application, digital relays have been applied for more than 10 years. Because of a number of electronic devices used for it, product cost becomes higher. Also, products installed during the past high-growth period will be at the end of lifetime and will be replaced. Therefore, replacing market is expected to grow and the reduction of cost is demanded. Considering above mentioned background, second generation digital protection and control unit as a successor is designed to have following concepts. Functional integration based on advanced digital technologies, Ethernet LAN based indoor communication network, cost reduction and downsizing. Pondering above concepts, integration of protection and control function is adopted in contrary to the functional segregation applied to the previous system in order to achieve one-unit concept. Also the adoption of Ethernet LAN for inter-unit communication is objective. This report shows the development of second-generation digital relay for distribution substation, which is equipped with control function and Ethernet LAN by reducing the size of auxiliary transformer unit and the same size as previous product is realized.

  6. Conformational analysis of (1. -->. 4)-. beta. -D-mannan triacetate

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deslandes, Y.; Marchessault, R.H.; Bluhm, T.L.

    1983-01-01

    In wood, algae, and tubers, glucomannans have varying mannose-to-glucose ratios (M/G). Since diffraction on glucomannans of widely varying M/G do not show significant change in unit-cell base plane dimensions, the authors have suggested that isomorphous replacement may occur in glucomannans. To further investigate this point, it has been undertaken conformational analysis of glucomannan triacetate in which the X-ray fiber diagram suggests that two nonequivalent residues make up the asymmetric unit. X-ray fiber diagrams of the triacetate of glucomannan from Tubera salep show twofold symmetry along the chain axis with a fiber repeat of 1.6 nm. This implies that the asymmetricmore » unit is composed of two pyranose rings since the virtual bond length of a single pyranose ring cannot be greater than approximately 0.54 nm. By using empirical potential functions, it could be shown that the minimum internal energy of a mannan triacetate chain corresponds to a state where contiguous mannose triacetate units are not conformationally equivalent. This supports the hypothesis of mannobiose hexaacetate as the asymmetric unit. Furthermore, introduction of glucose triacetate into the backbone did not change the minimum energy conformation, thereby lending support to the isomorphous replacement concept in crystalline glucomannans. 19 references, 13 figures, 2 tables.« less

  7. Case study involving suctioning of an electromyographic endotracheal tube.

    PubMed

    Evanina, Eileen Youshock; Hanisak, Jill L

    2005-04-01

    The electromyographic endotracheal tube (EMG-ETT) is a relatively new tool used to measure integrity of the vocal cord structures during surgery. We describe a case in which an EMG-ETT was inserted for the operative period but not replaced with an ETT during the immediate postoperative period. Intensive care unit nurses had difficulty suctioning the EMG-ETT. The patient was not provided the pulmonary toilet necessary until the EMG-ETT was removed and replaced with a regular ETT. The purpose of this article is to make anesthesia providers aware that when mechanical ventilation is required during the postoperative period, the EMG-ETT should be removed and replaced with a regular ETT to facilitate pulmonary toilet.

  8. TAVR and SAVR: Current Treatment of Aortic Stenosis.

    PubMed

    Hu, Patrick P

    2012-01-01

    Transcatheter aortic valve replacement (TAVR) was approved in the United States in late 2011, providing a critically needed alternative therapy for patients with severe aortic stenosis previously refused surgical aortic valve replacement (SAVR). Over 20,000 TAVR have been performed in patients worldwide since 2002 when Alain Cribier performed the first-in-man TAVR. This paper reviews the data from balloon expandable and self-expanding aortic stent valves as well as data comparing them with traditional surgical aortic valve replacement (SAVR). Complications using criteria established by the Valve Academic Research Consortium (VARC) are reviewed. Future challenges and possibilities are discussed and will make optimizing TAVR an important goal in the years to come.

  9. TAVR and SAVR: Current Treatment of Aortic Stenosis

    PubMed Central

    Hu, Patrick P.

    2012-01-01

    Transcatheter aortic valve replacement (TAVR) was approved in the United States in late 2011, providing a critically needed alternative therapy for patients with severe aortic stenosis previously refused surgical aortic valve replacement (SAVR). Over 20,000 TAVR have been performed in patients worldwide since 2002 when Alain Cribier performed the first-in-man TAVR. This paper reviews the data from balloon expandable and self-expanding aortic stent valves as well as data comparing them with traditional surgical aortic valve replacement (SAVR). Complications using criteria established by the Valve Academic Research Consortium (VARC) are reviewed. Future challenges and possibilities are discussed and will make optimizing TAVR an important goal in the years to come. PMID:22952419

  10. 49 CFR Appendix B to Part 564 - Information To Be Submitted for Long Life Replaceable Light Sources of Limited Definition

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... light sources used in motor vehicle headlighting systems. This part also serves as a repository for... standardized sealed beam units used in motor vehicle headlighting systems. § 564.2 Purposes. The purposes of... manufacturing specifications of standardized sealed beam headlamp units used on motor vehicles so that all...

  11. An Assessment of the Red Maple Resource in the Northeastern United States

    Treesearch

    Delton R., Jr. Alderman; Matthew S. Bumgardner; John E. Baumgras; John E. Baumgras

    2005-01-01

    The red maple resource in the northeastern United States has exhibited dramatic gains in the past 3 decades in terms of stem numbers and net volume. Growing stock and sawtimber volumes have displayed extraordinary growth compared to other species, and red maple is replacing important market species that have historically been used in the Northeast. The increase in red...

  12. 40 CFR 81.329 - Nevada.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... on the State of Nevada Division of Water Resources' map titled Water Resources and Inter-basin Flows...-26E) X Clovers Area (64)(32-39N, 42-46E) X 1 EPA designation replaces State designation. 2 Rest of... Boulder Flat (61) (31-37N, 45-51E): Upper Unit 61 X Lower Unit 61 X Rest of State 1 X 1 Rest of State...

  13. Feasibility of a Student Unit Record System within the Integrated Postsecondary Education Data System. Research and Development Report. NCES 2005-160

    ERIC Educational Resources Information Center

    Cunningham, Alisa F.; Milam, John

    2005-01-01

    This report examines the feasibility of implementing a student unit record system to replace the student-related components that currently are based on aggregate institution-level data collected as part of the Integrated Postsecondary Education Data System (IPEDS). The feasibility study was initiated by the National Center for Education Statistics…

  14. Africanization in the United States: replacement of feral European honeybees (Apis mellifera L.) by an African hybrid swarm.

    PubMed

    Pinto, M Alice; Rubink, William L; Patton, John C; Coulson, Robert N; Johnston, J Spencer

    2005-08-01

    The expansion of Africanized honeybees from South America to the southwestern United States in <50 years is considered one of the most spectacular biological invasions yet documented. In the American tropics, it has been shown that during their expansion Africanized honeybees have low levels of introgressed alleles from resident European populations. In the United States, it has been speculated, but not shown, that Africanized honeybees would hybridize extensively with European honeybees. Here we report a continuous 11-year study investigating temporal changes in the genetic structure of a feral population from the southern United States undergoing Africanization. Our microsatellite data showed that (1) the process of Africanization involved both maternal and paternal bidirectional gene flow between European and Africanized honeybees and (2) the panmitic European population was replaced by panmitic mixtures of A. m. scutellata and European genes within 5 years after Africanization. The post-Africanization gene pool (1998-2001) was composed of a diverse array of recombinant classes with a substantial European genetic contribution (mean 25-37%). Therefore, the resulting feral honeybee population of south Texas was best viewed as a hybrid swarm.

  15. Decreasing Postanesthesia Care Unit to Floor Transfer Times to Facilitate Short Stay Total Joint Replacements.

    PubMed

    Sibia, Udai S; Grover, Jennifer; Turcotte, Justin J; Seanger, Michelle L; England, Kimberly A; King, Jennifer L; King, Paul J

    2018-04-01

    We describe a process for studying and improving baseline postanesthesia care unit (PACU)-to-floor transfer times after total joint replacements. Quality improvement project using lean methodology. Phase I of the investigational process involved collection of baseline data. Phase II involved developing targeted solutions to improve throughput. Phase III involved measured project sustainability. Phase I investigations revealed that patients spent an additional 62 minutes waiting in the PACU after being designated ready for transfer. Five to 16 telephone calls were needed between the PACU and the unit to facilitate each patient transfer. The most common reason for delay was unavailability of the unit nurse who was attending to another patient (58%). Phase II interventions resulted in transfer times decreasing to 13 minutes (79% reduction, P < .001). Phase III recorded sustained transfer times at 30 minutes, a net 52% reduction (P < .001) from baseline. Lean methodology resulted in the immediate decrease of PACU-to-floor transfer times by 79%, with a 52% sustained improvement. Our methods can also be used to improve efficiencies of care at other institutions. Copyright © 2016 American Society of PeriAnesthesia Nurses. Published by Elsevier Inc. All rights reserved.

  16. Reducing saturated fat with oleogel/shortening blends in a baked product.

    PubMed

    Mert, Behic; Demirkesen, Ilkem

    2016-05-15

    Short dough cookie structure, characterized by its aerated and tender texture, depends on the presence of solid fat during kneading. The objective of this study was to investigate the potential application of Candelilla wax (CDW) containing oleogels for partial replacement of the shortening in cookies. Oleogels were prepared with different amounts of CDW and blended with a commercial bakery shortening. After crystallizing the oleogel/shortening blends by using a pilot scale crystallization unit, the blends were evaluated in a cookie formulations. When the shortening was completely replaced with oleogel softer products were obtained compared to liquid oil, but they were harder than the shortening containing products. On the other hand, partial replacement of shortening with oleogels provided much more acceptable dough and cookie characteristics. Results suggest that gradual replacement of shortening with oleogels may be a suitable approach for reduction of saturated fat in short dough products. Copyright © 2015 Elsevier Ltd. All rights reserved.

  17. Enhanced operator perception through 3D vision and haptic feedback

    NASA Astrophysics Data System (ADS)

    Edmondson, Richard; Light, Kenneth; Bodenhamer, Andrew; Bosscher, Paul; Wilkinson, Loren

    2012-06-01

    Polaris Sensor Technologies (PST) has developed a stereo vision upgrade kit for TALON® robot systems comprised of a replacement gripper camera and a replacement mast zoom camera on the robot, and a replacement display in the Operator Control Unit (OCU). Harris Corporation has developed a haptic manipulation upgrade for TALON® robot systems comprised of a replacement arm and gripper and an OCU that provides haptic (force) feedback. PST and Harris have recently collaborated to integrate the 3D vision system with the haptic manipulation system. In multiple studies done at Fort Leonard Wood, Missouri it has been shown that 3D vision and haptics provide more intuitive perception of complicated scenery and improved robot arm control, allowing for improved mission performance and the potential for reduced time on target. This paper discusses the potential benefits of these enhancements to robotic systems used for the domestic homeland security mission.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supplymore » sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).« less

  19. Features of electric drive sucker rod pumps for oil production

    NASA Astrophysics Data System (ADS)

    Gizatullin, F. A.; Khakimyanov, M. I.; Khusainov, F. F.

    2018-01-01

    This article is about modes of operation of electric drives of downhole sucker rod pumps. Downhole oil production processes are very energy intensive. Oil fields contain many oil wells; many of them operate in inefficient modes with significant additional losses. Authors propose technical solutions to improve energy performance of a pump unit drives: counterweight balancing, reducing of electric motor power, replacing induction motors with permanent magnet motors, replacing balancer drives with chain drives, using of variable frequency drives.

  20. STS-109 MS Newman and Massimino in airlock after EVA

    NASA Image and Video Library

    2002-03-05

    STS109-326-031 (5 March 2002) --- The broad smiles of astronauts Michael J. Massimino (left) and James H. Newman reflect the success of their just-completed lengthy space walk designed to finish the replacement of the solar arrays on the Hubble Space Telescope (HST). A day earlier, two other astronauts replaced one of sets of solar panels. The two are in the process of doffing their extravehicular mobility unit (EMU) space suits on the mid deck of the Space Shuttle Columbia.

  1. Astronauts Hoffman and Musgrave replace Solar Array Drive Electronics

    NASA Image and Video Library

    1993-12-09

    STS061-102-010 (9 Dec 1993) --- Astronauts Jeffrey A. Hoffman (left) and F. Story Musgrave team to replace one of two Solar Array Drive Electronics (SADE) units on the Hubble Space Telescope (HST). Musgrave is standing on a foot restraint mounted on the end of the Space Shuttle Endeavour's Remote Manipulator System (RMS) arm. The black object, in upper left corner, is part of the window frame, through which this 70mm frame was exposed, inside Endeavour's cabin.

  2. ASC Addresses Unit Commanders’ Concerns through LBE and Reset Programs

    DTIC Science & Technology

    2008-09-01

    Distribution Management Center (DMC). The DMC, based at ASC Headquarters on Rock Island Arsenal, Ilinois, has become the single ASC integrator for LBE and field-level reset in support of ARFORGEN. The reset of units returning from OEF/OIF consists of a series of actions to restore the units to a desired level of combat capability commensurate with future mission requirements. These actions include the repair of equipment, replacement of equipment lost during operations, and recapitalization of equipment where feasible and

  3. Antidumping Action in the United States and Around the World: An Analysis of International Data. CBO Paper.

    DTIC Science & Technology

    1998-06-01

    the price of sugar to the point that some processors, such as soft-drink producers, have replaced it with high - fructose corn syrup . That example...United States, both one on one and in the aggregate. Antidumping duty rates are high enough to be significant impediments to trade, especially the duties...the United States, although their rates are still high enough to be significant impediments to trade. Among the most active users, Canada had the next

  4. Collective Training and Fielding Opportunities for the Objective Force Maneuver Systems at the Unit of Action Level in a Unit Manning/Unit Replacement Personnel System

    DTIC Science & Technology

    2003-04-07

    PERSON Rife, Dave RifeD@awc.carlisle.army.mil a. REPORT Unclassified b. ABSTRACT Unclassified c. THIS PAGE Unclassified 19b. TELEPHONE NUMBER International...38 WORD COUNT = 8975 39 40 ENDNOTES 1 COL Pete Zielinski , Director, Joint/Army concepts HQs TRADOC “Transformation Update” briefing slide #9, Briefing...Staff. Interviewed by author, 18 February 2003, Carlisle Barracks, PA. Zielinski , Pete, COL Director, Joint/Army concepts HQs TRADOC “Transformation

  5. Azelastine Nasal Spray

    MedlinePlus

    ... use more or less of it or use it more often than prescribed by your doctor.Before using azelastine for the first time, remove the child-resistant screw cap and replace with the pump unit. Prime ...

  6. Cost of acute renal replacement therapy in the intensive care unit: results from The Beginning and Ending Supportive Therapy for the Kidney (BEST Kidney) Study

    PubMed Central

    2010-01-01

    Introduction Severe acute kidney injury (AKI) can be treated with either continuous renal replacement therapy (CRRT) or intermittent renal replacement therapy (IRRT). Limited evidence from existing studies does not support an outcome advantage of one modality versus the other, and most centers around the word use both modalities according to patient needs. However, cost estimates involve multiple factors that may not be generalizable to other sites, and, to date, only single-center cost studies have been performed. The aim of this study was to estimate the cost difference between CRRT and IRRT in the intensive care unit (ICU). Methods We performed a post hoc analysis of a prospective observational study among 53 centers from 23 countries, from September 2000 to December 2001. We estimated costs based on staffing, as well as dialysate and replacement fluid, anticoagulation and extracorporeal circuit. Results We found that the theoretic range of costs were from $3,629.80/day more with CRRT to $378.60/day more with IRRT. The median difference in cost between CRRT and IRRT was $289.60 (IQR 830.8-116.8) per day (greater with CRRT). Costs also varied greatly by region. Reducing replacement fluid volumes in CRRT to ≤ 25 ml/min (approximately 25 ml/kg/hr) would result in $67.20/day (23.2%) mean savings. Conclusions Cost considerations with RRT are important and vary substantially among centers. We identified the relative impact of four cost domains (nurse staffing, fluid, anticoagulation, and extracorporeal circuit) on overall cost differences, and hospitals can look to these areas to reduce costs associated with RRT. PMID:20346163

  7. Bridge condition assessment using remote sensors.

    DOT National Transportation Integrated Search

    2013-02-01

    The challenges of a deteriorating and aged infrastructure continue to challenge transportation : authorities as they align maintenance and replacement priorities with decreasing funds. The : United States is home to nearly 600,000 highway bridges of ...

  8. Liquid cooled garments

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Liquid cooled garments employed in several applications in which severe heat is encountered are discussed. In particular, the use of the garments to replace air line cooling units in a variety of industrial processing situations is discussed.

  9. 24 CFR 585.310 - Project-related restrictions applicable to Youthbuild transitional housing for the homeless.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation grant includes the eligible activities of acquisition, architectural and engineering fees, construction, rehabilitation, operating costs or replacement reserves of transitional housing units, and where...

  10. KSC-97pc655

    NASA Image and Video Library

    1997-04-16

    An oxygen generator destined to replace a malfunctioning unit on the Russian Mir Space Station is the object of much curiosity during preflight preparations in the SPACEHAB Payload Processing Facility. A SPACEHAB Double Module on the Space Shuttle Atlantis will carry the oxygen generator to Mir during STS-84, the sixth Shuttle-Mir docking. The nearly 300-pound generator, manufactured by RSC Energia in Russia, will replace one of two Mir units that have been malfunctioning recently. The generator functions by electrolysis, which separates water into its oxygen and hydrogen components. The hydrogen is vented and the oxygen is used for breathing by the Mir crew. The generator is 4.2 feet in length and 1.4 feet in diameter. STS-84, which is planned to include a Mir crew exchange of astronaut C. Michael Foale for Jerry M. Linenger, is targeted for a May 15 liftoff

  11. A new approach to explore the binding space of polysaccharide-based ligands: selectin antagonists.

    PubMed

    Calosso, Mickael; Charpentier, Daniel; Vaillancourt, Marc; Bencheqroun, Mohammed; St-Pierre, Gabrielle; Wilkes, Brian C; Guindon, Yvan

    2012-12-13

    The discovery of molecules that interfere with the binding of a ligand to a receptor remains a topic of great interest in medicinal chemistry. Herein, we report that a monosaccharide unit of a polysaccharide ligand can be replaced advantageously by a conformationally locked acyclic molecular entity. A cyclic component of the selectin ligand Sialyl Lewis(x), GlcNAc, is replaced by an acyclic tether, tartaric esters, which link two saccharide units. The conformational bias of this acyclic tether originates from the minimization of intramolecular dipole-dipole interaction and the gauche effect. The evaluation of the binding of these derivatives to P-selectin was measured by surface plasmon resonance spectroscopy. The results obtained in our pilot study suggest that the discovery of tunable tethers could facilitate the exploration of the carbohydrate recognition domain of various receptors.

  12. Assessing the guidelines for potassium replacement in pediatric oncology patients receiving amphotericin B.

    PubMed

    Lafreniere, Janet A; Hamilton, Donald P; Carr, Roxane R

    2006-10-01

    To examine the practice of potassium chloride (KCl) replacement in pediatric oncology patients receiving amphotericin B (amp-B). A retrospective observational chart review was conducted of patients who received amp-B on the oncology unit between August 2000 and May 2001. A survey was distributed to pediatric oncology pharmacists at other pediatric institutions to assess KCl infusion guidelines across North America. Twenty hypokalemic episodes were identified within 22 patient admissions. Fifty-five percent used KCl replacement (by all combined routes) at rates exceeding the institution's guidelines. Other pediatric institutions varied with respect to the maximum rates and concentration of KCl permitted on non-intensive care units. Based on the data from this review, the KCl administration guidelines for our hospital were changed. We now allow a maximum peripheral line concentration of 60 mEq/L, a maximum central line concentration of 120 mEq/L and a maximum KCl infusion rate of 0.4 mEq/kg/hr without the requirement of a heart monitor. Parenteral Nutrition is now restricted to maximum potassium concentration of 80 mEq/L and fluid-restricted patients are restricted to a maximum concentration of 150 mEq/L.

  13. A warm thermal enclave in the late Pleistocene of the south-eastern United States.

    PubMed

    Russell, Dale A; Rich, Fredrick J; Schneider, Vincent; Lynch-Stieglitz, Jean

    2009-05-01

    Physical and biological evidence supports the probable existence of an enclave of relatively warm climate located between the Southern Appalachian Mountains and the Atlantic Ocean in the United States during the Last Glacial Maximum. The region supported a mosaic of forest and prairie habitats inhabited by a "Floridian" ice-age biota. Plant and vertebrate remains suggest an ecological gradient towards Cape Hatteras (35 degreesN) wherein forests tended to replace prairies, and browsing proboscideans tended to replace grazing proboscideans. Beyond 35 degreesN, warm waters of the Gulf Stream were deflected towards the central Atlantic, and a cold-facies biota replaced "Floridian" biota on the Atlantic coastal plain. Because of niche diversity and relatively benign climate, biodiversity may have been greater in the south-eastern thermal enclave than in other unglaciated areas of North America. However, the impact of terminal Pleistocene megafaunal extinctions may also have been shorter and more severe in the enclave than further north. A comparison with biotic changes that occurred in North America approximately 55 million years (ma) ago at the Paleocene-Eocene Thermal Maximum suggests that similar processes of change took place under both ice-house and greenhouse climates.

  14. Electric auxiliary power unit for Shuttle evolution

    NASA Technical Reports Server (NTRS)

    Meyer, Doug; Weber, Kent; Scott, Walter

    1989-01-01

    The Space Shuttle Orbiter currently uses three hydrazine fueled auxiliary power units (APUs) to provide hydraulic power for the vehicle aerodynamic surface controls, main engine thrust vector control, landing gear, steering, and brakes. Electric auxiliary power units have been proposed as possible replacements to the hydrazine auxiliary power units. Along with the potential advantages, this paper describes an Electric APU configuration and addresses the technical issues and risks associated with the subsystem components. Additionally, characteristics of an Electric APU compared to the existing APU and the direction of future study with respect to the Electric APU is suggested.

  15. Biomimetic tissue-engineered anterior cruciate ligament replacement

    PubMed Central

    Cooper, James A.; Sahota, Janmeet S.; Gorum, W. Jay; Carter, Janell; Doty, Stephen B.; Laurencin, Cato T.

    2007-01-01

    There are >200,000 anterior cruciate ligament (ACL) ruptures each year in the United States, and, due to the poor healing properties of the ACL, surgical reconstruction with autograft or allograft tissue is the current treatment of these injuries. To regenerate the ACL, the ideal matrix should be biodegradable, porous, and exhibit sufficient mechanical strength to allow formation of neoligament tissue. Researchers have developed ACL scaffolds with collagen fibers, silk, biodegradable polymers, and composites with limited success. Our group has developed a biomimetic ligament replacement by using 3D braiding technology. In this preliminary in vivo rabbit model study for ACL reconstruction, the histological and mechanical evaluation demonstrated excellent healing and regeneration with our cell-seeded, tissue-engineered ligament replacement. PMID:17360607

  16. Fracture strength of all-ceramic lithium disilicate and porcelain-fused-to-metal bridges for molar replacement after dynamic loading.

    PubMed

    Chitmongkolsuk, Somsak; Heydecke, Guido; Stappert, Christian; Strub, Joerg R

    2002-03-01

    The replacement of missing posterior teeth using all-ceramic bridges remains a challenge. This study compares the fracture resistance of all-ceramic 3-unit bridges for the replacement of first molars to conventional porcelain-fused-to-metal bridges. Human premolars and molars were used to create two test groups and one control group of 16 specimens each. To simulate clinical parameters, the specimens were exposed to cyclic fatigue loading in an artificial mouth with simultaneous thermocycling. All samples were thereafter exposed to fracture strength testing. Porcelain-fused-to-metal bridges showed significantly higher fracture strengths than all-ceramic bridges. However, the fracture strength of the all-ceramic bridges was higher than peak physiological chewing forces.

  17. Enhanced recovery in total hip replacement: a clinical review.

    PubMed

    Ibrahim, M S; Twaij, H; Giebaly, D E; Nizam, I; Haddad, F S

    2013-12-01

    The outcome after total hip replacement has improved with the development of surgical techniques, better pain management and the introduction of enhanced recovery pathways. These pathways require a multidisciplinary team to manage pre-operative education, multimodal pain control and accelerated rehabilitation. The current economic climate and restricted budgets favour brief hospitalisation while minimising costs. This has put considerable pressure on hospitals to combine excellent results, early functional recovery and shorter admissions. In this review we present an evidence-based summary of some common interventions and methods, including pre-operative patient education, pre-emptive analgesia, local infiltration analgesia, pre-operative nutrition, the use of pulsed electromagnetic fields, peri-operative rehabilitation, wound dressings, different surgical techniques, minimally invasive surgery and fast-track joint replacement units.

  18. Advanced Technical Data Study

    DTIC Science & Technology

    1975-01-29

    will shut down automatically when condenser high pressure causes Pressure Limit Control high pressure switch to release. Press START switch (3...power cable (1) from facility pow- er. Troubleshoot cooling unit, for HI-LOW pressure switch repeated cutout. Refer to AGE ECU Cooling Unit...acti- vate when loss of air flow oc- curred, the pressure switch (3) failed to open circuit. Adjust or replace pressure switch . Refer to

  19. Laser Processed Heat Exchangers

    NASA Technical Reports Server (NTRS)

    Hansen, Scott

    2017-01-01

    The Laser Processed Heat Exchanger project will investigate the use of laser processed surfaces to reduce mass and volume in liquid/liquid heat exchangers as well as the replacement of the harmful and problematic coatings of the Condensing Heat Exchangers (CHX). For this project, two scale unit test articles will be designed, manufactured, and tested. These two units are a high efficiency liquid/liquid HX and a high reliability CHX.

  20. USSR Report, Energy, No. 154.

    DTIC Science & Technology

    1983-07-21

    mooring facilities and tank farms in the vicinity of Shevchenko. Neftyanyye Kamni: "Replacing Steam," by Yu. Arutyunov, Chief, Capital Construc...foremen, mechanics and signal men came into the cabin of the unit head. The last preparations for the trip were underway. Captain Petr Alekseyev...platforms, will be supplemented by another mobile unit of the semisubmersible type. It is now being built at the ship- yards of the Astrakhan

  1. A Comparative Analysis of Unit Cohesion in Vietnam

    DTIC Science & Technology

    2014-06-13

    the political process, and result in a communist government; this became known as the Domino Theory . The United States replaced the French and...a theory of linkage; leveraging the political ties of Communist countries, namely the USSR and China, to influence North Vietnam, and deterrence; a...and Henderson provide some of the more popular theories about cohesion. Winkler points out that the relationship between stability, cohesion and

  2. McREL Leadership Responsibilities through the Lens of Data: The Critical Nine

    ERIC Educational Resources Information Center

    James-Ward, Cheryl; Abuyen, Joy

    2015-01-01

    At the onset of the 21st century, the United States ushered in a new era of school accountability and reform with the No Child Left Behind Act [NCLB] (United States Department of Education, 2010). Until and unless it is repealed or replaced, this law continues in effect today, with many states now applying to renew their NCLB waivers (Klein,…

  3. Aircrew Sizing Survey 2011

    DTIC Science & Technology

    2014-10-01

    Resource JSF Joint Strike Fighter JPATS Joint Primary Aircraft Training System USMC United States Marine Corps USAF United States Air Force LIST...Surface Anthropometry Resource (CAESAR) was developed for the Joint Strike Fighter (JSF) program. The ACSS was intended to replace the JSF-CAESAR...an aircrew sample was made in 2003 by Hudson et al. They extracted a subset, named JSF CAESAR (Joint Strike Fighter), from the Civilian American and

  4. 25 CFR 141.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... cost to the owner of replacing an item with one having the same quality and usefulness. (l) Reservation... association or credit union operating under the laws of the United States or the laws of New Mexico, Arizona...

  5. 25 CFR 141.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... cost to the owner of replacing an item with one having the same quality and usefulness. (l) Reservation... association or credit union operating under the laws of the United States or the laws of New Mexico, Arizona...

  6. "Mitochondrial Replacement" Technologies and Human Germline Nuclear Modification.

    PubMed

    Lane, Alyssa; Nisker, Jeff

    2016-08-01

    In 2015 the United Kingdom became the first jurisdiction to approve "mitochondrial replacement techniques" (MRT), thereby dropping prohibitions against creating human embryos with a permanently altered genetic make-up for purposes of reproduction. MRT is a misnomer because in fact it is the nucleus of the oocyte of the woman who wants a genetically related child that is transferred to the enucleated oocyte of a woman paid to undergo IVF to provide the oocyte. MRT thus constitutes nuclear transfer, which is prohibited by criminal sanctions under sections of laws on reproductive cloning in Canada, the United States, Australia, and European countries that regulate assisted reproduction. By adopting policies permitting the use of MRT, the United Kingdom has become the first jurisdiction to counteract an international consensus prohibiting germline modification. Analyses of the legal, ethical, and societal implications of MRT in assisted human reproduction are essential. Copyright © 2016 The Society of Obstetricians and Gynaecologists of Canada/La Société des obstétriciens et gynécologues du Canada. Published by Elsevier Inc. All rights reserved.

  7. Unique method of tooth replacement in durophagous placodont marine reptiles, with new data on the dentition of Chinese taxa

    PubMed Central

    Neenan, James M; Li, Chun; Rieppel, Olivier; Bernardini, Federico; Tuniz, Claudio; Muscio, Giuseppe; Scheyer, Torsten M

    2014-01-01

    The placodonts of the Triassic period (˜252–201 mya) represent one of the earliest and most extreme specialisations to a durophagous diet of any known reptile group. Exceptionally enlarged crushing tooth plates on the maxilla, dentary and palatine cooperated to form functional crushing areas in the buccal cavity. However, the extreme size of these teeth, combined with the unusual way they occluded, constrained how replacement occurred. Using an extensive micro-computed tomographic dataset of 11 specimens that span all geographic regions and placodont morphotypes, tooth replacement patterns were investigated. In addition, the previously undescribed dental morphologies and formulae of Chinese taxa are described for the first time and incorporated into the analysis. Placodonts have a unique tooth replacement pattern and results follow a phylogenetic trend. The plesiomorphic Placodus species show many replacement teeth at various stages of growth, with little or no discernible pattern. On the other hand, the more derived cyamodontoids tend to have fewer replacement teeth growing at any one time, replacing teeth unilaterally and/or in functional units, thus maintaining at least one functional crushing area at all times. The highly derived placochelyids have fewer teeth and, as a result, only have one or two replacement teeth in the upper jaw. This supports previous suggestions that these taxa had an alternative diet to other placodonts. Importantly, all specimens show at least one replacement tooth growing at the most posterior palatine tooth plates, indicating increased wear at this point and thus the most efficient functional crushing area. PMID:24517163

  8. The STS-96 crew takes part in a Crew Equipment Interface Test at KSC

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Orbiter Processing Facility bay 1, STS-96 Mission Specialists Daniel Barry (M.D., Ph.D.), Valery Ivanovich Tokarev and Tamara E. Jernigan (Ph.D.) look into the payload bay of the orbiter Discovery. The STS-96 crew is at KSC for a Crew Equipment Interface Test. Other crew members participating are Commander Kent V. Rominger, Pilot Rick Douglas Husband, and Mission Specialists Ellen Ochoa (Ph.D.) and Julie Payette, with the Canadian Space Agency. The primary payload of STS-96 is the SPACEHAB Double Module. In addition, the Space Shuttle will carry unpressurized cargo such as the external Russian cargo crane known as STRELA; the Spacehab Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and an ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on the station for use during future ISS assembly missions. These cargo items will be stowed on the International Cargo Carrier, fitted inside the payload bay behind the SPACEHAB module. STS-96 is targeted for launch on May 24 from Launch Pad 39B.

  9. The STS-96 crew takes part in a Crew Equipment Interface Test at KSC

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Orbiter Processing Facility bay 1, STS-96 Commander Kent V. Rominger and Mission Specialists Ellen Ochoa (Ph.D.) and Valery Ivanovich Tokarev pose inside the orbiter Discovery. The STS-96 crew is at KSC to take part in a Crew Equipment Interface Test. Other members participating are Pilot Rick Douglas Husband and Mission Specialists Tamara E. Jernigan (Ph.D.), Daniel Barry (M.D., Ph.D.) and Julie Payette, who is with the Canadian Space Agency. Tokarev represents the Russian Space Agency. The primary payload of STS-96 is the SPACEHAB Double Module. In addition, the Space Shuttle will carry unpressurized cargo such as the external Russian cargo crane known as STRELA; the Spacehab Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and an ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on the station for use during future ISS assembly missions. These cargo items will be stowed on the International Cargo Carrier, fitted inside the payload bay behind the SPACEHAB module. STS-96 is targeted for launch on May 24 from Launch Pad 39B.

  10. KSC-99pp0346

    NASA Image and Video Library

    1999-03-25

    At Astrotech in Titusville, Fla., members of two Shuttle crews take a close look at a component of a Russian cargo crane, the Strela, to be mounted to the exterior of the Russian station segment on the International Space Station (ISS). From left, they are STS-101 Mission Specialist Edward Tsang Lu, plus STS-96 Mission Specialist Julie Payette and Pilot Rick Douglas Husband. Payette represents the Canadian Space Agency. Both missions include the SPACEHAB Double Module, carrying internal and resupply cargo for Station outfitting. For the first time, STS-96 will include an Integrated Cargo Carrier (ICC) that will carry the Strela; the SPACEHAB Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and a U.S.-built crane (ORU Transfer Device, or OTD) that will be stowed on the station for use during future ISS assembly missions. The ICC can carry up to 6,000 lb of unpressurized payload. It was built for SPACEHAB by DaimlerChrysler and RSC Energia of Korolev, Russia. STS-96 is targeted for launch on May 24 from Launch Pad 39B. STS-101 is scheduled to launch in early December 1999

  11. KSC-99pp0314

    NASA Image and Video Library

    1999-03-24

    In the Orbiter Processing Facility bay 1, STS-96 Mission Specialist Daniel Barry, M.D., Ph.D., looks at one of the foot restraints used for extravehicular activity, or space walks. The STS-96 crew is at KSC to take part in a Crew Equipment Interface Test. The other crew members are Commander Kent V. Rominger, Pilot Rick Douglas Husband, and Mission Specialists Ellen Ochoa (Ph.D.), Tamara E. Jernigan (Ph.D.), Julie Payette and Valery Ivanovich Tokarev. Payette represents the Canadian Space Agency and Tokarev the Russian Space Agency. The primary payload of STS-96 is the SPACEHAB Double Module. In addition, the Space Shuttle will carry unpressurized cargo such as the external Russian cargo crane known as STRELA; the Spacehab Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and an ORU Transfer Device (OTD), a U.S.-built crane that will be stowed on the station for use during future ISS assembly missions. These cargo items will be stowed on the International Cargo Carrier, fitted inside the payload bay behind the SPACEHAB module. STS-96 is targeted for launch on May 24 from Launch Pad 39B

  12. KSC-99pp0347

    NASA Image and Video Library

    1999-03-25

    At Astrotech in Titusville, Fla., STS-96 Mission Speciaists Daniel T. Barry (left), Julie Payette (center, with camera), and Tamara E. Jernigan (right, pointing) get a close look at one of the payloads on their upcoming mission. Other crew members are Commander Kent V. Rominger, and Mission Specialists Ellen Ochoa and Valery Ivanovich Tokarev, with the Russian Space Agency. Payette is with the Canadian Space Agency. For the first time, STS-96 will include an Integrated Cargo Carrier (ICC) that will carry a Russian cargo crane, the Strela, to be mounted to the exterior of the Russian station segment on the International Space Station (ISS); the SPACEHAB Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and a U.S.-built crane (ORU Transfer Device, or OTD) that will be stowed on the station for use during future ISS assembly missions. The ICC can carry up to 6,000 lb of unpressurized payload. It was built for SPACEHAB by DaimlerChrysler and RSC Energia of Korolev, Russia. STS-96 is targeted for launch on May 24 from Launch Pad 39B. STS-101 is scheduled to launch in early December 1999

  13. Dynamic torsional motion of a diruthenium complex with four homo-catecholates and first synthesis of a diruthenium complex with mixed-catecholates

    NASA Astrophysics Data System (ADS)

    Chang, Ho-Chol; Mochizuki, Katsunori; Kitagawa, Susumu

    2008-11-01

    Dynamic properties of a diruthenium complex with ligand-unsupported Ru-Ru triple bonds, Na 2[Ru 2(3,6-DTBCat) 4] ( 1), were studied using variable-temperature 1H NMR. Structural freedom derived from the ligand-unsupported structure leads to torsional motion about the Ru-Ru bonds in THF and in DMF. The observed solvent dependency corresponds to the electrostatic interactions between the diruthenium complex and Na + counter cations, which are sensitive to the polarity of solvents. In addition, a new diruthenium complex, [{Na(THF) 2(H 2O)}{Na(THF) 0.5(H 2O)}{Ru 2(3,6-DTBCat) 2(H 4Cat) 2}] ( 2·2.5THF·2H 2O), with a ligand-unsupported Ru-Ru bond surrounded by two different kinds of catecholate derivatives, has been synthesized and crystallographically characterized. The complex, which was characterized by single-crystal structural analysis, will provide an opportunity to investigate not only static molecular structures but also dynamic physicochemical properties in comparison with analogues containing four identical catecholate derivatives.

  14. Two Shuttle crews check equipment at SPACEHAB to be used on ISS Flights

    NASA Technical Reports Server (NTRS)

    1999-01-01

    At Astrotech in Titusville, Fla., technicians with DaimlerChrysler Aerospace and RSC Energia of Korolev, Russia, maneuver a Russian cargo crane, the Strela, which is to be mounted to the exterior of the Russian station segment on the International Space Station (ISS). The Strehla has been the focus for two Shuttle crews, STS-96 who are at KSC for a Crew Equipment Interface Test, and STS-101, for payload familiarization. For the first time, STS-96 will include an Integrated Cargo Carrier (ICC) that will carry the Russian cargo crane; the SPACEHAB Oceaneering Space System Box (SHOSS), which is a logistics items carrier; and a U.S.-built crane (ORU Transfer Device, or OTD) that will be stowed on the station for use during future ISS assembly missions. The ICC can carry up to 6,000 lb of unpressurized payload. It was built for SPACEHAB by DaimlerChrysler Aerospace and RSC Energia. STS-96 is targeted for launch on May 24 from Launch Pad 39B. STS-101 is scheduled to launch in early December 1999.

  15. Optimizing the Navy’s Investment in Space Professionals

    DTIC Science & Technology

    2011-09-01

    UFO Ultra High Frequency Follow-On UHF Ultra High Frequency URL Unrestricted Line USA United States Army USAF United States Air Force USCYBERCOM...LEASAT), and eight UHF Follow-On ( UFO ) satellites all flying in geostationary orbit (GEO). NAVSOC is the principle Navy command that operates, manages...and maintains the DoD’s narrowband UHF capability from five different ground stations. The replacement satellite for the aging UFO system is the

  16. 75 FR 55317 - Central Vermont Public Service Corporation; Notice of Application for Amendment of License and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... approval to replace the existing Unit 1 turbine, with a hydraulic capacity of 162 cfs and a nameplate capacity of 1,100 kW, with a new turbine unit having a hydraulic capacity of 177 cfs and a nameplate... 1,900 kW to 2,251 kW, and increase total project hydraulic capacity from 254 cfs to 269 cfs. l. A...

  17. Space Sustainment: A New Approach for America in Space

    DTIC Science & Technology

    2014-12-01

    Power Journal | 118 SCHRIEVER ESSAY WINNER SECOND PLACE United States to break from its laissez - faire traditions and replace them with an ideology of... leadership in space in the future. As the historical evidence suggests, if the United States decides not to promote transparency in space, other nations... leadership , and improves our own SSA through knowledge of other owner/operator satellite positional data.26 Similarly, Deputy Assistant Secretary of Defense

  18. The silver lining of disposable sporicidal privacy curtains in an intensive care unit.

    PubMed

    Kotsanas, Despina; Wijesooriya, W R P L I; Sloane, Tracy; Stuart, Rhonda L; Gillespie, Elizabeth E

    2014-04-01

    The environment is a well-known source of health care-acquired infection. Because of the known risk of contamination, patient privacy curtains require frequent changes to decrease the risk of spread from patients to curtain and visa versa. Fourteen disposable sporicidal privacy curtains were tested from December 2012 to June 2013 while hanging in a busy intensive care unit. Significant bacterial pathogens were identified and total bacteria enumerated as colony-forming units. Antimicrobial activity of curtain swatches was also tested against a range of bacteria in the laboratory. Measurements were recorded as zone of inhibition and contact inhibition. A cost analysis to replace standard curtains with disposable sporicidal curtains was also undertaken. Cultures grew low numbers of skin and environmental microorganisms with no methicillin-resistant Staphylococcus aureus, carbapenem-resistant Enterobacteriaceae, or Clostridium difficile detected. Vancomycin-resistant enterococci were recovered in very low numbers from 2 curtains where vancomycin-resistant enterococci-infected patients had been located. Privacy curtains demonstrated antimicrobial activity against C difficile and 13 additional bacterial pathogens. We conclude that disposable sporicidal privacy curtains are cost-effective and best replaced at 6 months in a high-risk area such as an intensive care unit. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  19. Soft tissue balancing in total shoulder replacement.

    PubMed

    Mueller, Maike; Hoy, Gregory

    2014-03-01

    Total shoulder arthroplasty is now capable of recreating near anatomic reproduction of native bony shoulder anatomy, but the function and longevity of anatomic shoulder replacement is dependent on a competent soft tissue envelope and adequate motoring of all musculo-tendinous units about the shoulder. Balancing the soft tissues requires understanding of the anatomy and pathology, as well as technical skills. The advent of reverse shoulder biomechanics has brought with it special requirements of understanding of the soft tissue elements still left in the shoulder despite major rotator cuff deficiency.

  20. KSC-08pd2361

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover has been installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  1. KSC-08pd2358

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help guide the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  2. KSC-08pd2357

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane lowers the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  3. KSC-08pd2359

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover alongside the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  4. KSC-08pd2354

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover awaits a move to be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  5. KSC-08pd2360

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers help maneuver the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover into place on the Orbital Replacement Unit Carrier, or ORUC, for installation. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  6. Valeri Tokarev and Julie Payette replace battery chargers in the FGB/Zarya module

    NASA Image and Video Library

    2017-04-20

    S96-E-5086 (31 May 1999) --- Astronaut Julie Payette and cosmonaut Valery I. Tokarev, mission specialists, are in the process of replacing all 18 of the battery charge/discharge units that support Zarya's six nickel-cadmium batteries. Known by the Russian acronym, "MIRTs," the batteries are thought to have been responsible for voltage problems first detected in January of this year, as Zarya, docked to Unity, orbited Earth. The photo was taken with an electronic still camera (ESC) at 03:15:38 GMT, May 31, 1999.

  7. 76 FR 62092 - Filing Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... INTERNATIONAL TRADE COMMISSION Filing Procedures AGENCY: International Trade Commission. ACTION: Notice of issuance of Handbook on Filing Procedures. SUMMARY: The United States International Trade Commission (``Commission'') is issuing a Handbook on Filing Procedures to replace its Handbook on Electronic...

  8. iss034e033850

    NASA Image and Video Library

    2013-01-23

    ISS034-E-033850 (23 Jan. 2013) --- Canadian Space Agency astronaut Chris Hadfield, Expedition 34 flight engineer, continues work to remove and replace the Service and Performance Checkout Unit (SPCU) Heat Exchanger inside the Quest airlock of the International Space Station.

  9. Program Predicts Nonlinear Inverter Performance

    NASA Technical Reports Server (NTRS)

    Al-Ayoubi, R. R.; Oepomo, T. S.

    1985-01-01

    Program developed for ac power distribution system on Shuttle orbiter predicts total load on inverters and node voltages at each of line replaceable units (LRU's). Mathematical model simulates inverter performance at each change of state in power distribution system.

  10. The Frame Constraint on Experimentally Elicited Speech Errors in Japanese.

    PubMed

    Saito, Akie; Inoue, Tomoyoshi

    2017-06-01

    The so-called syllable position effect in speech errors has been interpreted as reflecting constraints posed by the frame structure of a given language, which is separately operating from linguistic content during speech production. The effect refers to the phenomenon that when a speech error occurs, replaced and replacing sounds tend to be in the same position within a syllable or word. Most of the evidence for the effect comes from analyses of naturally occurring speech errors in Indo-European languages, and there are few studies examining the effect in experimentally elicited speech errors and in other languages. This study examined whether experimentally elicited sound errors in Japanese exhibits the syllable position effect. In Japanese, the sub-syllabic unit known as "mora" is considered to be a basic sound unit in production. Results showed that the syllable position effect occurred in mora errors, suggesting that the frame constrains the ordering of sounds during speech production.

  11. Purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies of great cormorant (Phalacrocorax carbo) haemoglobin.

    PubMed

    Jagadeesan, G; Malathy, P; Gunasekaran, K; Harikrishna Etti, S; Aravindhan, S

    2014-11-01

    Haemoglobin is the iron-containing oxygen-transport metalloprotein that is present in the red blood cells of all vertebrates. In recent decades, there has been substantial interest in attempting to understand the structural basis and functional diversity of avian haemoglobins. Towards this end, purification, crystallization, preliminary X-ray diffraction and molecular-replacement studies have been carried out on cormorant (Phalacrocorax carbo) haemoglobin. Crystals were grown by the hanging-drop vapour-diffusion method using PEG 3350, NaCl and glycerol as precipitants. The crystals belonged to the trigonal system P3₁21, with unit-cell parameters a=b=55.64, c=153.38 Å, β=120.00°; a complete data set was collected to a resolution of 3.5 Å. Matthews coefficient analysis indicated that the crystals contained a half-tetramer in the asymmetric unit.

  12. Crystallization and preliminary X-ray analysis of Leishmania major glyoxalase I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ariza, Antonio; Vickers, Tim J.; Greig, Neil

    2005-08-01

    The detoxification enzyme glyoxalase I from L. major has been crystallized. Preliminary molecular-replacement calculations indicate the presence of three glyoxalase I dimers in the asymmetric unit. Glyoxalase I (GLO1) is a putative drug target for trypanosomatids, which are pathogenic protozoa that include the causative agents of leishmaniasis. Significant sequence and functional differences between Leishmania major and human GLO1 suggest that it may make a suitable template for rational inhibitor design. L. major GLO1 was crystallized in two forms: the first is extremely disordered and does not diffract, while the second, an orthorhombic form, produces diffraction to 2.0 Å. Molecular-replacement calculationsmore » indicate that there are three GLO1 dimers in the asymmetric unit, which take up a helical arrangement with their molecular dyads arranged approximately perpendicular to the c axis. Further analysis of these data are under way.« less

  13. Simulation of a Flywheel Electrical System for Aerospace Applications

    NASA Technical Reports Server (NTRS)

    Truong, Long V.; Wolff, Frederick J.; Dravid, Narayan V.

    2000-01-01

    A Flywheel Energy Storage Demonstration Project was initiated at the NASA Glenn Research Center as a possible replacement for the battery energy storage system on the International Space Station (ISS). While the hardware fabrication work was being performed at a university and contractor's facility, the related simulation activity was begun at Glenn. At the top level, Glenn researchers simulated the operation of the ISS primary electrical system (as described in another paper) with the Flywheel Energy Storage Unit (FESU) replacing one Battery Charge and Discharge Unit (BCDU). The FESU consists of a Permanent Magnet Synchronous Motor/Generator (PMSM), which is connected to the flywheel; the power electronics that connects the PMSM to the ISS direct-current bus; and the associated controller. The PMSM model is still under development, but this paper describes the rest of the FESU model-the simulation of the converter and the associated control system that regulates energy transfer to and from the flywheel.

  14. Vertical nuclear proliferation.

    PubMed

    Sidel, Victor W

    2007-01-01

    All the nuclear-weapon states are working to develop new nuclear-weapon systems and upgrade their existing ones. Although the US Congress has recently blocked further development of small nuclear weapons and earth-penetrating nuclear weapons, the United States is planning a range of new warheads under the Reliable Replacement Warhead programme, and renewing its nuclear weapons infrastructure. The United Kingdom is spending 1 billion pounds sterling on updating the Atomic Weapons Establishment at Aldermaston, and about 20 billion pounds sterling on replacing its Vanguard submarines and maintaining its Trident warhead stockpile. The US has withdrawn from the Anti-Ballistic Missile Treaty and plans to install missile defence systems in Poland and the Czech Republic; Russia threatens to upgrade its nuclear countermeasures. The nuclear-weapon states should comply with their obligations under Article VI of the Non-Proliferation Treaty, as summarised in the 13-point plan agreed at the 2000 NPT Review Conference, and they should negotiate a Nuclear Weapons Convention.

  15. STS-84 oxygen generator for Mir on display at SPACEHAB

    NASA Technical Reports Server (NTRS)

    1997-01-01

    An oxygen generator destined to replace a malfunctioning unit on the Russian Mir Space Station is the object of much curiosity during preflight preparations in the SPACEHAB Payload Processing Facility. A SPACEHAB Double Module on the Space Shuttle Atlantis will carry the oxygen generator to Mir during STS-84, the sixth Shuttle-Mir docking. The nearly 300-pound generator, manufactured by RSC Energia in Russia, will replace one of two Mir units that have been malfunctioning recently. The generator functions by electrolysis, which separates water into its oxygen and hydrogen components. The hydrogen is vented and the oxygen is used for breathing by the Mir crew. The generator is 4.2 feet in length and 1.4 feet in diameter. STS-84, which is planned to include a Mir crew exchange of astronaut C. Michael Foale for Jerry M. Linenger, is targeted for a May 15 liftoff.

  16. Options Studied for Managing Space Station Solar Array Electrical Hazards for Sequential Shunt Unit Replacement

    NASA Technical Reports Server (NTRS)

    Delleur, Ann M.; Kerslake, Thomas W.; Levy, Robert K.

    2004-01-01

    The U.S. solar array strings on the International Space Station are connected to a sequential shunt unit (SSU). The job of the SSU is to shunt, or short, the excess current from the solar array, such that just enough current is provided downstream to maintain the 160-V bus voltage while meeting the power load demand and recharging the batteries. Should an SSU fail on-orbit, it would be removed and replaced with the on-orbit spare during an astronaut space walk or extravehicular activity (EVA) (see the photograph). However, removing an SSU during an orbit Sun period with input solar array power connectors fully energized could result in substantial hardware damage and/or safety risk to the EVA astronaut. The open-circuit voltage of cold solar-array strings can exceed 320 V, and warm solar-array strings could feed a short circuit with a total current level exceeding 240 A.

  17. Tooth replacement and putative odontogenic stem cell niches in pharyngeal dentition of medaka (Oryzias latipes).

    PubMed

    Abduweli, Dawud; Baba, Otto; Tabata, Makoto J; Higuchi, Kazunori; Mitani, Hiroshi; Takano, Yoshiro

    2014-04-01

    The small-sized teleost fish medaka, Oryzias latipes, has as many as 1000 pharyngeal teeth undergoing continuous replacement. In this study, we sought to identify the tooth-forming units and determine its replacement cycles, and further localize odontogenic stem cell niches in the pharyngeal dentition of medaka to gain insights into the mechanisms whereby continuous tooth replacement is maintained. Three-dimensional reconstruction of pharyngeal epithelium and sequential fluorochrome labeling of pharyngeal bones and teeth indicated that the individual functional teeth and their successional teeth were organized in families, each comprising up to five generations of teeth and successional tooth germs, and that the replacement cycle of functional teeth was approximately 4 weeks. BrdU label/chase experiments confirmed the existence of clusters of label-retaining epithelial cells at the posterior end of each tooth family where the expression of pluripotency marker Sox2 was confirmed by in situ hybridization. Label-retaining cells were also identified in the mesoderm immediately adjacent to the posterior end of each tooth family. These data suggest the importance of existence of slow-cycling dental epithelial cells and Sox2 expressions at the posterior end of each tooth family to maintain continuous tooth formation and replacement in the pharyngeal dentition of medaka.

  18. Trade study comparing specimen chamber servicing methods for the Space Station Centrifuge Facility

    NASA Technical Reports Server (NTRS)

    Calvisi, Michael L.; Sun, Sidney C.

    1991-01-01

    The Specimen Chamber Service Unit, a component of the Space Station Centrifuge Facility, must provide a clean enclosure on a continuing basis for the facility's plant, rodent and primate specimens. The specimen chambers can become soiled and can require periodic servicing to maintain a clean environment for the specimens. Two methods of servicing the specimen chambers are discussed: washing the chambers with an on-board washer, or disposing of the soiled chambers and replacing them with clean ones. Many of these issues are addressed by developing several servicing options, using either cleaning or replacement as the method of providing clean specimen chambers, and then evaluating each option according to a set of established quantitative and qualitative criteria. Disposing and replacing the Specimen Chambers is preferable to washing them.

  19. A replacement LH2 recirculation line before installation in Discovery

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Gary Hamilton (left) and James Stickley, both with United Space Alliance, check out a spare four-inch diameter LH2 recirculation line that will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  20. A replacement LH2 recirculation line before installation in Discovery

    NASA Technical Reports Server (NTRS)

    1999-01-01

    James Stickley (left) and Derry Dilby (right), who are with United Space Alliance, check over a spare four-inch diameter LH2 recirculation line that will be used to replace a damaged LH2 line in the orbiter Discovery. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. Workers noted a dent in the line during routine aft compartment inspections Tuesday, Dec. 7. The dent measures 12 inches long and about =-inch deep. Managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  1. ISS Expedition 53 U.S. Spacewalk 46

    NASA Image and Video Library

    2017-10-20

    Outside the International Space Station, Expedition 53 Commander Randy Bresnik and Flight Engineer Joe Acaba of NASA conducted a spacewalk Oct. 20 to continue upgrades to and maintenance of station hardware. It was the third spacewalk in two weeks for Expedition 53 crewmembers outside the Quest airlock. During the excursion, Bresnik and Acaba replaced a failed camera light on the new Latching End Effector “hand” on the Canadarm2 robotic arm, installed a new high definition camera on the starboard truss of the complex, replaced a fuse on the Dextre Special Dexterous Manipulator attachment for the arm and removed thermal blankets from two spare electrical routing units for future robotic replacement work, if required. It was the fifth spacewalk in Bresnik’s career and the third for Acaba.

  2. MOOSE: Manned On-Orbit Servicing Equipment

    NASA Technical Reports Server (NTRS)

    Budinoff, J. (Editor); Leontsinis, N. (Editor); Lane, J. (Editor); Singh, R. (Editor); Angelone, K.; Boswell, C.; Chamberlain, I.; Concha, M.; Corrodo, M.; Custodio, O.

    1993-01-01

    The ability to service satellites has thus far been limited to low earth orbit platforms within reach of the Space Shuttle. Other orbits, such as geosynchronous orbits containing high-value spacecraft have not been attainable by a servicing vehicle. The useful life of a satellite can be extended by replacing spent propellant and damaged orbital replacement units, forestalling the need for eventual replacement. This growing need for satellite on-orbits servicing can be met by the Manned On-Orbit Servicing Equipment (MOOSE). Missions requiring orbit transfer capability, precision manipulation and maneuvering, and man-in-the-loop control can be accomplished using MOOSE. MOOSE is a flexible, reusable, single operator, aerobraking spacecraft designed to refuel, repair, and service orbiting spacecraft. MOOSE will be deployed from Space Station Freedom, (SSF), where it will be stored, resupplied, and refurbished.

  3. KSC-06pd0022

    NASA Image and Video Library

    2006-01-11

    KENNEDY SPACE CENTER, FLA. - In the Thermal Protection System Facility, Tim Wright, engineering manager with United Space Alliance, tests a new tile, called "Boeing replacement insulation" or "BRI-18." The new tiles will gradually replace older tiles around main landing gear doors, external tank doors and nose landing gear doors. Currently, 10 tiles have been processed inside the facility. Discovery will receive the first BRI-18 tiles. Technicians inside the Orbiter Processing Facility are performing fit checks and will begin bonding the tiles to the vehicle this month. The raw material is manufactured by The Boeing Company in Huntington Beach, Calif. Replacing older tile with the BRI-18 tile in strategic areas is one of the Columbia Accident Investigation Board's recommendations to strengthen the orbiters. The tiles are more impact resistant than previous designs, enhancing the crew’s safety.

  4. KSC-06pd0021

    NASA Image and Video Library

    2006-01-11

    KENNEDY SPACE CENTER, FLA. - In the Thermal Protection System Facility, Tim Wright, engineering manager with United Space Alliance, tests a new tile, called "Boeing replacement insulation" or "BRI-18." The new tiles will gradually replace older tiles around main landing gear doors, external tank doors and nose landing gear doors. Currently, 10 tiles have been processed inside the facility. Discovery will receive the first BRI-18 tiles. Technicians inside the Orbiter Processing Facility are performing fit checks and will begin bonding the tiles to the vehicle this month. The raw material is manufactured by The Boeing Company in Huntington Beach, Calif. Replacing older tile with the BRI-18 tile in strategic areas is one of the Columbia Accident Investigation Board's recommendations to strengthen the orbiters. The tiles are more impact resistant than previous designs, enhancing the crew’s safety.

  5. Language Profile in Congenital Hypothyroid Children Receiving Replacement Therapy.

    PubMed

    Soliman, Hend; Abdel Hady, Aisha Fawzy; Abdel Hamid, Asmaa; Mahmoud, Heba

    2016-01-01

    The aim of this work was to evaluate receptive and expressive language skills in children with congenital hypothyroidism receiving early hormonal replacement treatment before the age of 3 months and to identify any subtle areas of weaknesses in their language development to check the necessity for future language intervention. The study was conducted on 30 hypothyroid children receiving hormonal replacement. They were subdivided into group I (5-8 years 11 months; 12 cases) and group II (9-12 years 11 months; 18 cases). All patients were subjected to a protocol of assessment applied in the Diabetes, Endocrine and Metabolism Pediatric Unit (DEMPU) and evaluation of language skills by the REAL scale. The younger group reached average Arabic language scores, while the older group showed moderate language delay. Early replacement therapy supports language development in young children. However, longitudinal and follow-up studies are required to identify difficulties presenting at older ages that may affect children in the academic settings. © 2016 S. Karger AG, Basel.

  6. Evaluation of plant biomass resources available for replacement of fossil oil

    PubMed Central

    Henry, Robert J

    2010-01-01

    The potential of plants to replace fossil oil was evaluated by considering the scale of production required, the area of land needed and the types of plants available. High yielding crops (50 tonnes/ha) that have a high conversion efficiency (75%) would require a global land footprint of around 100 million ha to replace current (2008) oil consumption. Lower yielding or less convertible plants would require a larger land footprint. Domestication of new species as dedicated energy crops may be necessary. A systematic analysis of higher plants and their current and potential uses is presented. Plant biotechnology provides tools to improve the prospects of replacing oil with plant-derived biomass by increasing the amount of biomass produced per unit area of land and improving the composition of the biomass to increase the efficiency of conversion to biofuel and biomaterials. Options for the production of high value coproducts and the expression of processing aids such as enzymes in the plant may add further value to plants as bioenergy resources. PMID:20070873

  7. Developing Ultra Reliable Life Support for the Moon and Mars

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2009-01-01

    Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

  8. Control of ammonia and urea emissions from urea manufacturing facilities of Petrochemical Industries Company (PIC), Kuwait.

    PubMed

    Khan, A R; Al-Awadi, L; Al-Rashidi, M S

    2016-06-01

    Petrochemical Industries Company (PIC) in Kuwait has mitigated the pollution problem of ammonia and urea dust by replacing the melting and prilling units of finished-product urea prills with an environmentally friendly granulation process. PIC has financed a research project conducted by the Coastal and Air Pollution Program's research staff at the Kuwait Institute for Scientific Research to assess the impact of pollution control strategies implemented to maintain a healthy productive environment in and around the manufacturing premises. The project was completed in three phases: the first phase included the pollution monitoring of the melting and prilling units in full operation, the second phase covered the complete shutdown period where production was halted completely and granulation units were installed, and the last phase encompassed the current modified status with granulation units in full operation. There was substantial decrease in ammonia emissions, about 72%, and a 52.7% decrease in urea emissions with the present upgrading of old melting and prilling units to a state-of-the-art technology "granulation process" for a final finished product. The other pollutants, sulfur dioxide (SO2), nitrogen oxides (NOx), and volatile organic compounds (VOCs), have not shown any significant change, as the present modification has not affected the sources of these pollutants. Petrochemical Industries Company (PIC) in Kuwait has ammonia urea industries, and there were complaints about ammonia and urea dust pollution. PIC has resolved this problem by replacing "melting and prilling unit" of final product urea prills by more environmentally friendly "granulation unit." Environmental Pollution and Climate Program has been assigned the duty of assessing the outcome of this change and how that influenced ammonia and urea dust emissions from the urea manufacturing plant.

  9. The impact of changing nicotine replacement therapy licensing laws in the United Kingdom: findings from the International Tobacco Control Four Country Survey.

    PubMed

    Shahab, Lion; Cummings, K Michael; Hammond, David; Borland, Ron; West, Robert; McNeill, Ann

    2009-08-01

    To evaluate the impact of a new licence for some nicotine replacement therapy products (NRT) for cutting down to stop (CDTS) on changes in the pattern of NRT use. Quasi-experimental design comparing changes in NRT use across two waves of a population-based, replenished-panel, telephone survey conducted before and after the introduction of new licensing laws in the United Kingdom with changes in NRT use in three comparison countries (Australia, Canada and United States) without a licensing change. A total of 7386 and 7013 smokers and recent ex-smokers participating in the 2004 and/or 2006/7 survey. Data were collected on demographic and smoking characteristics as well as NRT use and access. In order to account for interdependence resulting from some participants being present in both waves, generalized estimation equations with an exchangeable correlation matrix were used to assess within-country changes and linear and logistic regressions to assess between-country differences in adjusted analyses. NRT use was more prevalent in the United Kingdom and increased across waves in all countries but no wave x country interaction was observed. There was no evidence that the licensing change increased the prevalence of CDTS or the use of NRT (irrespective of how it was accessed) for CDTS in the United Kingdom relative to comparison countries. There was also no evidence for a change in concurrent smoking and NRT use among smokers not attempting to stop in the United Kingdom relative to comparison countries. The addition of the CDTS licence for some NRT products in the United Kingdom appears to have had very limited, if any, impact on NRT use in the first year after the licence change.

  10. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XI, PART I--MAINTAINING THE FUEL SYSTEM (PART I), CUMMINS DIESEL ENGINES, PART II--UNIT REPLACEMENT (ENGINE).

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF DIFFERENCES BETWEEN TWO AND FOUR CYCLE ENGINES, THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM, AND THE PROCEDURES FOR DIESEL ENGINE REMOVAL. TOPICS ARE (1) REVIEW OF TWO CYCLE AND FOUR CYCLE CONCEPT, (2) SOME BASIC CHARACTERISTICS OF FOUR CYCLE ENGINES,…

  11. Army Medical Department Officers in Division Assignments: Prepared to Succeed, or Doomed to Fail?

    DTIC Science & Technology

    1992-04-15

    officers for tactical unit asgnments. IL.BACKGROUND In the late 1970s, the concept of multi-functional. forward support battalions (FSB) i divisions...functions. Headquarters made up of officers who were each experienced in a single discipline replaced these centers of expertise. The concept assumed that...the evacuation of casualties and movement of the medical unit. Although many of these capabilities exists in the FSB concept , flexibility and

  12. United States Air Force Security Forces in an Era of Terrorist Threats

    DTIC Science & Technology

    1999-06-01

    their primary duties. The third alternative is to eliminate the Palace Tenure deployments of security personnel and replace them with dedicated units...The Phoenix Raven program, the 820th Security Forces Group, and Palace Tenure commitments. The specified mission varies by organization, but the...820th Security Forces Group. January 1999, slide 4. 166 Statement of LT. Col. Larry A. Buckingham , 820th Security Forces Group Commander, “820th Security

  13. Solid-State Thyratron Replacement. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roth, Ian

    2017-12-12

    Under this SBIR, DTI developed a solid-state switch as an alternative to legacy thyratron equipment. Our Phase II objective was to make a solid-state thyratron replacement that would provide equivalent or better performance, much higher reliability (at least a 20 year lifetime, compared to a thyratron’s two-year lifetime) and would sell for ~3x the cost of a thyratron, or less than $40k. We were successful in building a solid-state switch which could reliably function as a thyratron replacement. The unit was designed to directly replace the thyratrons currently being used at SLAC’s Linac Coherent Light Source (LCLS), and was builtmore » in a tank that was small enough to fit into the existing thyratron cabinet, providing a true form-fit-function replacement path. We tested the switch at the full operating specifications: 48 kV, 6.3 kA, and 1 µs risetime. We also demonstrated a peak-to-peak pulse jitter of 1.5 ns, which is five times shorter than is typical for thyratrons. This lower jitter would improve the performance of the LCLS beam. The predicted reliability is more than 80 years, which is 40 times greater than a thyratron.« less

  14. Cell biology of sarcomeric protein engineering: disease modeling and therapeutic potential.

    PubMed

    Thompson, Brian R; Metzger, Joseph M

    2014-09-01

    The cardiac sarcomere is the functional unit for myocyte contraction. Ordered arrays of sarcomeric proteins, held in stoichiometric balance with each other, respond to calcium to coordinate contraction and relaxation of the heart. Altered sarcomeric structure-function underlies the primary basis of disease in multiple acquired and inherited heart disease states. Hypertrophic and restrictive cardiomyopathies are caused by inherited mutations in sarcomeric genes and result in altered contractility. Ischemia-mediated acidosis directly alters sarcomere function resulting in decreased contractility. In this review, we highlight the use of acute genetic engineering of adult cardiac myocytes through stoichiometric replacement of sarcomeric proteins in these disease states with particular focus on cardiac troponin I. Stoichiometric replacement of disease causing mutations has been instrumental in defining the molecular mechanisms of hypertrophic and restrictive cardiomyopathy in a cellular context. In addition, taking advantage of stoichiometric replacement through gene therapy is discussed, highlighting the ischemia-resistant histidine-button, A164H cTnI. Stoichiometric replacement of sarcomeric proteins offers a potential gene therapy avenue to replace mutant proteins, alter sarcomeric responses to pathophysiologic insults, or neutralize altered sarcomeric function in disease. © 2014 Wiley Periodicals, Inc.

  15. Inventory of methane emissions from U.S. cattle

    NASA Astrophysics Data System (ADS)

    Westberg, H.; Lamb, B.; Johnson, K. A.; Huyler, M.

    2001-01-01

    Many countries, including the United States, are in the process of inventorying greenhouse gas emissions as a prerequisite for designing control strategies. We have developed a measurement-based inventory of methane emissions from cattle in the United States. Methane emission factors were established for the major livestock groups using an internal tracer method. The groups studied included cows, replacement heifers, slaughter cattle, calves, and bulls in the beef sector and cows plus replacement heifers in the dairy industry. Since methane emission is dependent on the quality and quantity of feed, diets were chosen that are representative of the feed regimes utilized by producers in the United States. Regional cattle populations, obtained from U.S. Department of Agriculture statistics, were combined with the methane emission factors to yield regional emission estimates. The methane totals from the five regions were then summed to give a U.S. inventory of cattle emissions for 1990, 1992, 1994, 1996, and 1998. Annual releases ranged from 6.50 Tg in 1990 to a high of 6.98 Tg in 1996. On a regional scale the North Central region of the United States had the largest methane emissions from livestock followed by the South Central and the West. The beef cow group released the most methane (˜2.5 Tg yr-1) followed by slaughter cattle (˜1.7 Tg yr-1) and dairy cows at about 1.5 Tg yr-1. Methane released by cattle in the United States contributes about 11% of the global cattle source.

  16. Balanced crystalloids versus saline in the intensive care unit: study protocol for a cluster-randomized, multiple-crossover trial.

    PubMed

    Semler, Matthew W; Self, Wesley H; Wang, Li; Byrne, Daniel W; Wanderer, Jonathan P; Ehrenfeld, Jesse M; Stollings, Joanna L; Kumar, Avinash B; Hernandez, Antonio; Guillamondegui, Oscar D; May, Addison K; Siew, Edward D; Shaw, Andrew D; Bernard, Gordon R; Rice, Todd W

    2017-03-16

    Saline, the intravenous fluid most commonly administered to critically ill adults, contains a high chloride content, which may be associated with acute kidney injury and death. Whether using balanced crystalloids rather than saline decreases the risk of acute kidney injury and death among critically ill adults remains unknown. The Isotonic Solutions and Major Adverse Renal Events Trial (SMART) is a pragmatic, cluster-level allocation, cluster-level crossover trial being conducted between 1 June 2015 and 30 April 2017 in five intensive care units at Vanderbilt University Medical Center in Nashville, TN, USA. SMART compares saline (0.9% sodium chloride) with balanced crystalloids (clinician's choice of lactated Ringer's solution or Plasma-Lyte A®). Each intensive care unit is assigned to provide either saline or balanced crystalloids each month, with the assigned crystalloid alternating monthly over the course of the trial. All adults admitted to participating intensive care units during the study period are enrolled and followed until hospital discharge or 30 days after enrollment. The anticipated enrollment is approximately 14,000 patients. The primary outcome is Major Adverse Kidney Events within 30 days-the composite of in-hospital death, receipt of new renal replacement therapy, or persistent renal dysfunction (discharge creatinine ≥200% of baseline creatinine). Secondary clinical outcomes include in-hospital mortality, intensive care unit-free days, ventilator-free days, vasopressor-free days, and renal replacement therapy-free days. Secondary renal outcomes include new renal replacement therapy receipt, persistent renal dysfunction, and incidence of stage 2 or higher acute kidney injury. This ongoing pragmatic trial will provide the largest and most comprehensive comparison to date of clinical outcomes with saline versus balanced crystalloids among critically ill adults. For logistical reasons, SMART was prospectively registered separately for the medical ICU (SMART-MED; ClinicalTrials.gov identifier: NCT02444988 ; registered on 11 May 2015; date of first patient enrollment: 1 June 2015) and the nonmedical ICUs (SMART-SURG; ClinicalTrials.gov identifier: NCT02547779 ; registered on 9 September 2015; date of first patient enrollment: 1 October 2015).

  17. Four-unit fixed dental prostheses replacing the maxillary incisors supported by two narrow-diameter implants - a five-year case series.

    PubMed

    Moráguez, Osvaldo; Vailati, Francesca; Grütter, Linda; Sailer, Irena; Belser, Urs C

    2017-07-01

    (1) To determine the survival rate of 10 four-unit fixed dental prostheses (FDPs) replacing the four maxillary incisors, supported by 20 narrow-diameter implants (NDIs), (2) to assess the incidence of mechanical and biological complications, and (3) to evaluate bone level changes longitudinally after final FDP insertion. Ten patients (six women, four men), mean age 49.4 ± 12.6 years, were treated with a four-unit anterior maxillary FDP (six screw-retained; four cemented). Biological parameters, eventual technical complications, radiographic measurements, and study casts were assessed at 1 (baseline), 3, and 5 years after implant placement. A multilevel logistic regression test was performed on clinical parameters and bone level changes (significance level P < 0.05). The 5-year implant and FDP survival rate was 100%. Mean modified plaque index (mPI) values were 0.03 and 0.02 at 3 and 5 years, significantly lower when compared to mPI (0.11 ± 0.31) at 1 year. Mean modified sulcus bleeding index (mSBI) was 0.08, 0.08, and 0.15 over time. Probing depth (PD) values were 1.57, 1.64, and 2.03 mm. Statistically significant differences were found between 1 vs. 5 year (P = 0.0003) and 3 vs. 5 year (P = 0.001). Keratinized mucosa (3.65 mm) remained stable during observation period. DIB mean values were 2.01 ± 0.34, 2.13 ± 0.13, and 2.17 ± 0.38 mm. Patient satisfaction based on visual analog scale revealed favorable fulfillment of overall treatment and esthetic expectations. Two NDIs supporting a four-unit FDP to replace the four missing maxillary incisors may be considered a predictable treatment modality. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  18. Sandy Hook : alternative access concept plan and vehicle replacement study

    DOT National Transportation Integrated Search

    2009-06-01

    This study addresses two critical issues of concern to the Sandy Hook Unit of Gateway National : Recreational Area: (1) options for alternative access to Sandy Hook during peak summer season, : particularly when the park is closed to private vehicles...

  19. Validation of RAP and/or RAS in hydraulic cement concrete : technical report.

    DOT National Transportation Integrated Search

    2017-05-01

    The increasing maintenance and rehabilitation actions lead to considerable amounts of reclaimed asphalt pavement : (RAP) left in stockpiles in the United States. The possible use of RAP in Portland cement concrete (PCC) as aggregate : replacement not...

  20. Evaluation of Repair Techniques for Impact-Damaged Prestressed Beams

    DOT National Transportation Integrated Search

    2018-05-01

    Collisions between over-height vehicles and bridges occur about 1,000 times per year in the United States. Collision damage to bridges can range from minor to catastrophic, potentially requiring repair or replacement of a bridge beam. For prestressed...

  1. 29 CFR 1919.28 - Unit proof tests-cranes and gear accessory thereto.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... case of hydraulic cranes, when due to the limitation of pressure it is impossible to lift a load 25... associated with replacements or renewals, may be made with spring or hydraulic balances where dead loads are...

  2. 29 CFR 1919.28 - Unit proof tests-cranes and gear accessory thereto.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... case of hydraulic cranes, when due to the limitation of pressure it is impossible to lift a load 25... associated with replacements or renewals, may be made with spring or hydraulic balances where dead loads are...

  3. 29 CFR 1919.28 - Unit proof tests-cranes and gear accessory thereto.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... case of hydraulic cranes, when due to the limitation of pressure it is impossible to lift a load 25... associated with replacements or renewals, may be made with spring or hydraulic balances where dead loads are...

  4. An Integrated, Evidence-Based Approach to Transitioning to Operations: Specifications for Future Replacement Lights on ISS

    NASA Technical Reports Server (NTRS)

    Leveton, Lauren; Brainard, George; Whitmire, Alexandra; Kubey, Alan; Maida, Jim; Bowen, Charles; Johnston, Smith

    2010-01-01

    The International Space Station (ISS) currently uses General Luminaire Assemblies (GLAs) as its primary light source. These GLAs are composed of fluorescent lighting and are integrated into the electrical system on Station. Seventy seven of these units are distributed throughout the vehicle, and many of the lights, having reached their lifespan, are no longer functional; while backup panels are available on orbit, it is anticipated that the supplies of fluorescents on the station will be exhausted by 2015. The ISS vehicle office is therefore preparing to replace all of the GLAs, with Solid State Light Assemblies (SSLAs) composed of white Light Emitting Diodes (LEDs). In the Spring of 2010, an announcement for the replacement lights was released. The announcement specified that proposed lighting systems should use LED technology, given certain power draw restrictions and no changes to how the lights are currently controlled (a central on/off switch per node, and a dial to turn on/off and increase brightness on each lighting unit). The replacement lights are to follow current specifications for brightness levels (lux) and color temperature (degrees Kelvin, or K). Reportedly, the lighting on orbit is dim and suboptimal. The average brightness of the lights (given all lights within a node are operational) is 291 lux; by comparison, recommended office lighting ranges from 200 to 500 lux, and daylight ranges on a typical overcast day, consists of 10,000 to 25,000 lux. Representatives from NASA Behavioral Health and Performance Element (BHP) and Human Factors and Habitability identified that maintaining current brightness levels limits visual acuity, work space, and the use of light as a countermeasure for improving circadian entrainment, hastening phase shifting, evoking acute alertness and enhancing performance. Revised lighting specifications are therefore needed to optimize the replacement lights for the ISS.

  5. Iron balance in the red blood cell donor.

    PubMed

    Brittenham, G M

    2005-01-01

    Phlebotomy of a unit of blood produces a loss of 200 to 250 mg of iron in haemoglobin. Because of physiological differences in iron balance between women of childbearing age and men, the loss of similar amounts of iron at donation has divergent consequences for committed donors. Women of childbearing age have an increased risk of iron deficiency if they donate more than one unit per year while men are usually able to maintain iron balance while donating four or more units of blood per year. Lack of iron is the most important medical reason for deferral from repeat donation and primarily affects women of childbearing age. Deferral of these women discourages them from further donation and may lead to their loss as donors. Provisions for blood donation should protect those who give blood from adverse consequences of their altruism. Safe and effective approaches to iron replacement after donation have been developed that can prevent iron deficiency in women who give blood repeatedly. Blood centres should consider incorporating programmes of iron replacement for women of childbearing age who give blood repeatedly to protect these donors against iron deficiency and to enhance their retention and commitment as dedicated donors.

  6. A dented LH2 recirculation line is removed from Discovery

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In the Payload Changeout Room, Launch Pad 39B, United Space Alliance and NASA workers look at the replacement main propulsion system liquid hydrogen recirculation line (left) to be installed in Shuttle Discovery's aft compartment. At right is the dented line that has been removed. The 12-inch-long dent was discovered during routine aft compartment inspections Tuesday, Dec. 7. The line recirculates hydrogen from the Shuttle main engines back to the external tank during prelaunch engine conditioning. The line is being replaced and managers expect the replacement work to take about 3 days, followed by system retests and final aft compartment close-outs. Preliminary assessments reflect a launch date of Space Shuttle Discovery on mission STS-103 no earlier than Dec. 16. STS-103 is the third servicing mission for the Hubble Space Telescope.

  7. Maintenance Task Data Base for Buildings: Architectural Systems

    DTIC Science & Technology

    1991-05-01

    EXTERIOR DOOR Task Descriptin REPLACE METAL WIRE MESH PAINTD EEIO DOOR Unit of Measure: CWNT~ Fr enc of ccrence: H: i.~UU A: 15U.UU L: 160.00 Persons...5R.ULA5S:REPL.3RD FL.WD.FR.PAIN.)DL.EX .WIND0WS Unit of Measure: COURT- Freq.. enc OfOcr ee : 0.Yu A: 1.UU L: 1AiI Persons per Team: 1 Task DuRation: 0...System: EXTERIOR WINDOWS Susystem: INOPERABLE WIND)OWS Tak ecrpRtVLACE 2ND FLOOR STEEL FRAME(PAIT ETWINDOWS Unit of Measure: - JN I Frequjeng orOc ence : N

  8. Modernization of Koesters interferometer and high accuracy calibration gauge blocks

    NASA Astrophysics Data System (ADS)

    França, R. S.; Silva, I. L. M.; Couceiro, I. B.; Torres, M. A. C.; Bessa, M. S.; Costa, P. A.; Oliveira, W., Jr.; Grieneisen, H. P. H.

    2016-07-01

    The Optical Metrology Division (Diopt) of Inmetro is responsible for maintaining the national reference of the length unit according to International System of Units (SI) definitions. The length unit is realized by interferometric techniques and is disseminated to the dimensional community through calibrations of gauge blocks. Calibration of large gauge blocks from 100 mm to 1000 mm has been performed by Diopt with a Koesters interferometer with reference to spectral lines of a krypton discharge lamp. Replacement of this lamp by frequency stabilized lasers, traceable now to the time and frequency scale, is described and the first results are reported.

  9. KSC-08pd2355

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers lift the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover before attaching a crane. The cover will be installed on the Orbital Replacement Unit Carrier, or ORUC. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  10. KSC-08pd2356

    NASA Image and Video Library

    2008-08-08

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, an overhead crane moves the Fine Guidance Sensor Scientific Instrument Protective Enclosure, or FSIPE, cover to be installed on the Orbital Replacement Unit Carrier, or ORUC, below. The ORUC is one of three carriers that are being prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the fifth and final Hubble servicing mission, STS-125. Launch is targeted for Oct. 8. PHoto credit: NASA/Jack Pfaller

  11. Gyre and gimble: a maximum-likelihood replacement for Patterson correlation refinement.

    PubMed

    McCoy, Airlie J; Oeffner, Robert D; Millán, Claudia; Sammito, Massimo; Usón, Isabel; Read, Randy J

    2018-04-01

    Descriptions are given of the maximum-likelihood gyre method implemented in Phaser for optimizing the orientation and relative position of rigid-body fragments of a model after the orientation of the model has been identified, but before the model has been positioned in the unit cell, and also the related gimble method for the refinement of rigid-body fragments of the model after positioning. Gyre refinement helps to lower the root-mean-square atomic displacements between model and target molecular-replacement solutions for the test case of antibody Fab(26-10) and improves structure solution with ARCIMBOLDO_SHREDDER.

  12. Phytoestrogens: a viable option?

    PubMed

    Russell, Lori; Hicks, G Swink; Low, Annette K; Shepherd, Jinna M; Brown, C Andrew

    2002-10-01

    Estrogen replacement therapy is one of the most commonly prescribed medicines in the United States by traditional medical professionals. Over the past decade, the market for complementary/ alternative therapies for hormone replacement has dramatically increased. Women are seeking more "natural" alternatives to treat menopausal symptoms. Well-designed randomized clinical trials are often lacking, as is the information on efficacy and safety. This article will review several popular herbal therapies for menopausal symptoms including phytoestrogens, black cohosh (Cimicifuga racemosa), dong quai (Angelica sinensis), chast tree (Vitex agnus-castus), and wild Mexican yam. Their use, mechanism of action, and adverse effects are outlined.

  13. KSC-02pd0711

    NASA Image and Video Library

    2002-05-17

    KENNEDY SPACE CENTER, FLA. -- STS-111 Mission Specialist Philippe Perrin gets ready in his launch and entry suit for a simulated launch countdown at the pad. Perrin is with the French Space Agency. The simulation is part of STS-111 Terminal Countdown Demonstration Test activities for the STS-111 crew and Expedition 5. The payload on the mission to the International Space Station includes the Mobile Base System, an Orbital Replacement Unit and Multi-Purpose Logistics Module Leonardo. The Expedition 5 crew is traveling on Endeavour to replace the Expedition 4 crew on the Station. Launch of Endeavour is scheduled for May 30, 2002.

  14. An Examination of the Conceptual Basis of a Tactical, Logistical, and Air Simulation (ATLAS).

    DTIC Science & Technology

    1980-03-01

    guides the simulation from the start. From this scenario and the de - veloping tactical situation comes information which triggers the tactical-decision...effect of tactical aircraft in a combat situation together with the effect of weapons to destroy the aircraft. The presence of transport aircraft is...sector, the ability of that sector to resupply existing combat units, to transport replacement items and supplies, and to move the new unit through

  15. The United States Army Medical Department Journal. The United States Army Dental Corps: A Century of Commitment, Service, and Care

    DTIC Science & Technology

    2011-03-01

    Nerve in US Army 70 Dental Assistants Before and After Training as Preventive Dental Specialists David G. Greathouse, PhD; et al Palatal Fracture in...Command’s Corporate Dental Application (CDA). Originally conceived and developed as a standard solution to replace an array of locally implemented... palatal fracture and displacement of the bone up into the nasal vestibule. Their article carefully describes the unusual circumstances surrounding

  16. Expedition Seven CDR Malenkenko performs IFM on Condensate Water Processor

    NASA Image and Video Library

    2003-07-03

    ISS007-E-09229 (3 July 2003) --- Cosmonaut Yuri I. Malenchenko, Expedition 7 mission commander, performs scheduled in-flight maintenance (IFM) on the condensate water processor (SRV-K2M) by removing and replacing its BKO multifiltration/purification column unit, which has reached its service life limit (450 liters min.). The old unit will be discarded on Progress. The IFM took place in the Zvezda Service Module on the International Space Station (ISS). Malenchenko represents Rosaviakosmos.

  17. Expedition Seven CDR Malenkenko performs IFM on Condensate Water Processor

    NASA Image and Video Library

    2003-07-03

    ISS007-E-09231 (3 July 2003) --- Cosmonaut Yuri I. Malenchenko, Expedition 7 mission commander, performs scheduled in-flight maintenance (IFM) on the condensate water processor (SRV-K2M) by removing and replacing its BKO multifiltration/purification column unit, which has reached its service life limit (450 liters min.). The old unit will be discarded on Progress. The IFM took place in the Zvezda Service Module on the International Space Station (ISS). Malenchenko represents Rosaviakosmos.

  18. Final Environmental Planning Technical Report. Public Services and Facilities

    DTIC Science & Technology

    1984-06-01

    The marked patrol units have a life expectancy of 2 years (90,000 to 100,000 miles) and about one-half of the 15 units are replaced each year...much more visible police force, longer car life , and lower maintenance costs. The proposal has received support from within the City government, but...Burns, Albin, and Carpenter; the Air Force Military Assistance to Safety and Traffic (MAST) helicopter service; Flight for Life ; and several other suppor

  19. Neurodynamical model of collective brain

    NASA Technical Reports Server (NTRS)

    Zak, Michail

    1992-01-01

    A dynamical system which mimics collective purposeful activities of a set of units of intelligence is introduced and discussed. A global control of the unit activities is replaced by the probabilistic correlations between them. These correlations are learned during a long term period of performing collective tasks, and are stored in the synaptic interconnections. The model is represented by a system of ordinary differential equations with terminal attractors and repellers, and does not contain any man-made digital devices.

  20. Toxicological Outcomes in Rats Exposed to Inhaled Ethanol During Gestation

    EPA Science Inventory

    Recent legislation has encouraged replacing petroleum-based fuels with renewable alternatives including ethanol, which is currently blended with gasoline in the United States at concentrations up to 15%. Efforts to increase the amount of ethanol in gasoline have prompted concerns...

  1. 77 FR 66824 - City of Holyoke Gas and Electric Department; Notice of Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... fishlift entrance. The licensee further proposes to do an in-kind replacement of the Hadley Unit 1 turbine... capacity by 600 kilowatts, and increase the maximum hydraulic capacity by an estimated 320 cubic feet per...

  2. 77 FR 38608 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ..., professional qualifications and skills, training courses completed, certifications received, level of education... Activity Unit Identification Code (UIC).'' Safeguards: Delete entry and replace with ``The NTMPS servers.... All data transferred is encrypted. The interface server is protected from attempts to penetrate the...

  3. Fuel consumption of ADS-B and non-ADS-B helicopter operation in the Gulf of Mexico

    DOT National Transportation Integrated Search

    2013-07-01

    Automatic Dependent Surveillance Broadcast (ADSB) is a key enabling technology for the Next Generation Air Transportation System (NextGen) in the United States. The NextGen system replaces the current ground based commandandcontrol syste...

  4. Transport, speciation, toxicity, and treatability of highway stormwater discharged to receiving waters in Louisiana : [tech summary].

    DOT National Transportation Integrated Search

    2013-01-01

    As centralized wastewater treatment continues to improve while increasingly replacing decentralized systems, urban : rainfall-runoff has become the leading contributor of water body impairments in the United States (USEPA, 1996). For : many water bod...

  5. ASI: Dunaliella Marine Microalgae to Drop-In Replacement Liquid Transportation Fuel

    USDA-ARS?s Scientific Manuscript database

    Microalgae are a promising biofuels feedstock, theoretically yielding concentrations of triacylglycerides (TAGs) per unit area far higher than traditional feedstocks due to their rapid growth. Dunaliella is particularly advantageous as a feedstock because it is currently commercially mass cultured,...

  6. Finite element modeling approach and performance evaluation of fiber reinforced polymer sandwich bridge panels : summary.

    DOT National Transportation Integrated Search

    2009-08-01

    In the United States, about 27% of the bridges are classified as structurally deficient or functionally obsolete. Bridge owners are continually investigating methods to effectively retrofit existing bridges, or to economically replace them with new o...

  7. User delay costs due to work zone operations Near Echo Junction.

    DOT National Transportation Integrated Search

    2010-11-01

    With the increasing number of road rehabilitation projects across the United States, the need to reduce user costs due to congestion is more important than ever. The Utah Department of Transportation (UDOT) has proposed replacing two I-80 bridges ove...

  8. Finite element modeling approach and performance evaluation of fiber reinforced polymer sandwich bridge panels : final report.

    DOT National Transportation Integrated Search

    2009-08-01

    In the United States, about 27% of the bridges are classified as structurally deficient or functionally obsolete. : Bridge owners are continually investigating methods to effectively retrofit existing bridges, or to economically replace : them with n...

  9. 77 FR 22760 - Proposed Information Collection; Comment Request; Southeast Region Gulf of Mexico Electronic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    ... electronic logbook memory chip will be removed from the unit and downloaded at the contractor site in College Station, Texas. A new logbook memory chip will replace the removed memory chip, a process taking less than...

  10. Steel pin and hanger assembly replacement options : final report.

    DOT National Transportation Integrated Search

    2017-01-01

    A number of steel beam bridges exist in the United States that contain pin and hanger assemblies. Pin and hanger assemblies are fracture critical members whose failure would result in collapse of the bridge or render it unable to perform its expected...

  11. An analysis of student programmatic delays in postsecondary flight training programs : a national study

    DOT National Transportation Integrated Search

    1996-01-01

    Since the passage of the Airline Deregulation Act (ADA) in 1978, the need for professionally--trained air carrier pilots in the United States has expanded substantially. Postsecondary academic institutions have replaced the military as a major source...

  12. Evaluation of repair techniques for impact-damaged prestressed beams : final report.

    DOT National Transportation Integrated Search

    2017-04-01

    Collisions between over height vehicles and bridges occur about 1,000 times per year in the United States. Collision damage to : bridges can range from minor to catastrophic, potentially requiring repair or replacement of a bridge beam. For prestress...

  13. Complications from prophylactic replacement of cardiac implantable electronic device generators in response to United States Food and Drug Administration recall: A systematic review and meta-analysis.

    PubMed

    Zeitler, Emily P; Patel, Divyang; Hasselblad, Vic; Sanders, Gillian D; Al-Khatib, Sana M

    2015-07-01

    The number of cardiac implantable electronic device (CIED) recalls and advisories has increased over the past 3 decades, yet no consensus exists on how to best manage patients with these CIEDs, partially because rates of complications from prophylactic replacement are unknown. The purpose of this study was to establish rates of complications when recalled CIED generators are replaced prophylactically. We searched MEDLINE and the Cochrane Controlled Trials Register for reports of prophylactic replacement of recalled CIED generators. Studies with <20 subjects were excluded. We then conducted a meta-analysis of qualifying studies to determine the rates of combined major complications, mortality, and reoperation. We identified 7 citations that met our inclusion criteria and reported ≥1 end-points of interest. Four were single center, and 3 were multicenter. Six studies collected data retrospectively (n = 1213) and 1 prospectively (n = 222). Using a random effects model to combine data from all included studies, the rate of major complications was 2.5% (95% confidence interval [CI] 1.0%-4.5%). Combining data from 6 studies reporting mortality and reoperation, the rates were 0.5% (95% CI 0.1%-0.9%) and 2.5% (95% CI 0.8%-4.5%), respectively. Prophylactic replacement of recalled CIED generators is associated with a low mortality rate but nontrivial rates of other major complications similar to those reported when CIED generators are replaced for other reasons. Thus, when considering replacing a recalled CIED generator, known risks of elective generator replacement likely apply and can be weighed against risks associated with device failure. Copyright © 2015 Heart Rhythm Society. Published by Elsevier Inc. All rights reserved.

  14. Urine output on an intensive care unit: case-control study.

    PubMed

    Solomon, Anthony W; Kirwan, Christopher J; Alexander, Neal D E; Nimako, Kofi; Jurukov, Angela; Forth, Rebecca J; Rahman, Tony M

    2010-12-14

    To compare urine output between junior doctors in an intensive care unit and the patients for whom they are responsible. Case-control study. General intensive care unit in a tertiary referral hospital. 18 junior doctors responsible for clerking patients on weekday day shifts in the unit from 23 March to 23 April 2009 volunteered as "cases." Controls were the patients in the unit clerked by those doctors. Exclusion criteria (for both groups) were pregnancy, baseline estimated glomerular filtration rate <15 ml/min/1.73 m(2), and renal replacement therapy. Oliguria (defined as mean urine output <0.5 ml/kg/hour over six or more hours of measurement) and urine output (in ml/kg/hour) as a continuous variable. Doctors were classed as oliguric and "at risk" of acute kidney injury on 19 (22%) of 87 shifts in which urine output was measured, and oliguric to the point of being "in injury" on one (1%) further shift. Data were available for 208 of 209 controls matched to cases in the data collection period; 13 of these were excluded because the control was receiving renal replacement therapy. Doctors were more likely to be oliguric than their patients (odds ratio 1.99, 95% confidence interval 1.08 to 3.68, P=0.03). For each additional 1 ml/kg/hour mean urine output, the odds ratio for being a case rather than a control was 0.27 (0.12 to 0.58, P=0.001). Mortality among doctors was astonishingly low, at 0% (0% to 18%). Managing our own fluid balance is more difficult than managing it in our patients. We should drink more water. Modifications to the criteria for acute kidney injury could be needed for the assessment of junior doctors in an intensive care unit.

  15. How to treat two adjacent missing teeth with dental implants. A systematic review on single implant-supported two-unit cantilever FDP's and results of a 5-year prospective comparative study in the aesthetic zone.

    PubMed

    Van Nimwegen, W G; Raghoebar, G M; Tymstra, N; Vissink, A; Meijer, H J A

    2017-06-01

    To conduct a systematic review on the clinical outcome of single implant-supported two-unit cantilever FDP's and to conduct a 5-year prospective comparative pilot study of patients with a missing central and lateral upper incisor treated with either a single implant-supported two-unit cantilever FDP or two implants with solitary implant crowns in the aesthetic zone. Medline, Embase and the Cochrane Central Register of Controlled Trials were searched (last search 1 August 2016) for eligible studies. In the comparative pilot study, an implant-cantilever group of five patients with a single implant-supported two-unit cantilever FDP (NobelReplace Groovy Regular Platform) was compared with an implant-implant group of five patients with two adjacent single implant-supported crowns (NobelReplace Groovy Regular Platform) in the aesthetic zone. Implant survival, marginal bone level (MBL) changes, pocket probing depth, papilla index and patient satisfaction were assessed during a 5-year follow-up period. Five of 276 articles were considered eligible for data extraction. Implant survival ranged from 96·6% to 100%. Marginal bone level changes were higher in the anterior region than in the posterior region. Technical complications occurred more often in the posterior than anterior region. In the 5-year comparative pilot study, no clinically significant differences in hard and soft peri-implant tissue levels occurred between both groups. Single implant-supported two-unit cantilever FDP's can be a viable alternative to the placement of two adjacent single implant crowns in the aesthetic zone. Due to technical complications, placement of two-unit cantilever crowns in the posterior region can be considered unwise. © 2017 John Wiley & Sons Ltd.

  16. Wide Field Camera 3 Accommodations for HST Robotics Servicing Mission

    NASA Technical Reports Server (NTRS)

    Ginyard, Amani

    2005-01-01

    This slide presentation discusses the objectives of the Hubble Space Telescope (HST) Robotics Servicing and Deorbit Mission (HRSDM), reviews the Wide Field Camera 3 (WFC3), and also reviews the contamination accomodations for the WFC3. The objectives of the HRSDM are (1) to provide a disposal capability at the end of HST's useful life, (2) to upgrade the hardware by installing two new scientific instruments: replace the Corrective Optics Space Telescope Axial Replacement (COSTAR) with the Cosmic Origins Spectrograph (COS), and to replace the Wide Field/Planetary Camera-2 (WFPC2) with Wide Field Camera-3, and (3) Extend the Scientific life of HST for a minimum of 5 years after servicing. Included are slides showing the Hubble Robotic Vehicle (HRV) and slides describing what the HRV contains. There are also slides describing the WFC3. One of the mechanisms of the WFC3 is to serve partially as replacement gyroscopes for HST. There are also slides that discuss the contamination requirements for the Rate Sensor Units (RSUs), that are part of the Rate Gyroscope Assembly on the WFC3.

  17. Clustered atom-replaced structure in single-crystal-like metal oxide

    NASA Astrophysics Data System (ADS)

    Araki, Takeshi; Hayashi, Mariko; Ishii, Hirotaka; Yokoe, Daisaku; Yoshida, Ryuji; Kato, Takeharu; Nishijima, Gen; Matsumoto, Akiyoshi

    2018-06-01

    By means of metal organic deposition using trifluoroacetates (TFA-MOD), we replaced and localized two or more atoms in a single-crystalline structure having almost perfect orientation. Thus, we created a new functional structure, namely, clustered atom-replaced structure (CARS), having single-crystal-like metal oxide. We replaced metals in the oxide with Sm and Lu and localized them. Energy dispersive x-ray spectroscopy results, where the Sm signal increases with the Lu signal in the single-crystalline structure, confirm evidence of CARS. We also form other CARS with three additional metals, including Pr. The valence number of Pr might change from 3+ to approximately 4+, thereby reducing the Pr–Ba distance. We directly observed the structure by a high-angle annular dark-field image, which provided further evidence of CARS. The key to establishing CARS is an equilibrium chemical reaction and a combination of additional larger and smaller unit cells to matrix cells. We made a new functional metal oxide with CARS and expect to realize CARS in other metal oxide structures in the future by using the above-mentioned process.

  18. Ultra Reliable Closed Loop Life Support for Long Space Missions

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.; Ewert, Michael K.

    2010-01-01

    Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

  19. STS-109 Onboard Photo of Extra-Vehicular Activity (EVA)

    NASA Technical Reports Server (NTRS)

    2002-01-01

    This is an onboard photo of Astronaut John M. Grunsfield, STS-109 payload commander, participating in the third of five spacewalks to perform work on the Hubble Space Telescope (HST). On this particular walk, Grunsfield, joined by Astronaut Richard M. Lirnehan, turned off the telescope in order to replace its power control unit (PCU), the heart of the HST's power system. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where crew members completed system upgrades to the HST. Included in those upgrades were: replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. The HST views galaxies, stars, planets, comets, possibly other solar systems, and even unusual phenomena such as quasars, with 10 times the clarity of ground-based telescopes. Launched March 1, 2002 the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  20. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-06

    This is an onboard photo of Astronaut John M. Grunsfield, STS-109 payload commander, participating in the third of five spacewalks to perform work on the Hubble Space Telescope (HST). On this particular walk, Grunsfield, joined by Astronaut Richard M. Lirnehan, turned off the telescope in order to replace its power control unit (PCU), the heart of the HST's power system. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where crew members completed system upgrades to the HST. Included in those upgrades were: replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. The HST views galaxies, stars, planets, comets, possibly other solar systems, and even unusual phenomena such as quasars, with 10 times the clarity of ground-based telescopes. Launched March 1, 2002 the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  1. STS-61 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1994-01-01

    The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.

  2. Automated Coal-Mine Shuttle Car

    NASA Technical Reports Server (NTRS)

    Collins, E. R., Jr.

    1984-01-01

    Cable-guided car increases efficiency in underground coal mines. Unmanned vehicle contains storage batteries in side panels for driving traction motors located in wheels. Batteries recharged during inactive periods or slid out as unit and replaced by fresh battery bank. Onboard generator charges batteries as car operates.

  3. Resource Allocation--The Case of the Australian National University.

    ERIC Educational Resources Information Center

    Jackson, G. W.

    1982-01-01

    A historical, incremental method for allocating resources in the Institute for Advanced Studies in recent years is being replaced by a new approach involving the identification of purposes and pursuits and evaluation of their importance. Greater responsiveness to unit needs is the objective. (MSE)

  4. 75 FR 57745 - FPL Energy Maine Hydro LLC; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... Unit 3 of the project by rewinding the generator and replacing the turbine runner with a more efficient runner. The proposed upgrade would increase the installed and hydraulic capacities of the project by 5.7...

  5. Load beam unit replaceable inserts for dry coal extrusion pumps

    DOEpatents

    Saunders, Timothy; Brady, John D.

    2012-11-13

    A track assembly for a particulate material extrusion pump according to an exemplary aspect of the present disclosure includes a link assembly with a roller bearing. An insert mounted to a load beam located such that the roller bearing contacts the insert.

  6. Operations analysis (study 2.1). Payload designs for space servicing, addendum

    NASA Technical Reports Server (NTRS)

    Wolfe, R. R.

    1974-01-01

    Space replaceable units and payload configurations are revised to reflect increased levels of redundancy to be more consistent with current design practices. A reassessment of expendable payload design reliabilities was performed to provide a common basis for comparison with space serviceable configurations.

  7. Hopkins in the A/L

    NASA Image and Video Library

    2013-12-18

    View of Mike Hopkins, Expedition 38 Flight Engineer (FE), during remove and replace (R&R) of Hard Upper Torso (HUT) of Extravehicular Mobility Unit (EMU), in the airlock (A/L) during preparation for EVA-24. Photo was taken during Expedition 38. Image was released by astronaut on Twitter.

  8. Conversion between network-level and project-level units of measure for use in a bridge-management system.

    DOT National Transportation Integrated Search

    1998-01-01

    VDOT is implementing Pontis 3.0 to provide the analytical component of its Bridge Management System (BMS). This system prioritizes bridge maintenance, repair, rehabilitation, and replacement (MRR & R) needs using cost/benefit analysis. The accuracy o...

  9. 7 CFR 654.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... period for which project or measure benefits and costs have been evaluated. The evaluated life starts after the last project measure of the evaluation unit has been completed. Landuser. Those who... purpose and the replacement of portions of project measures as specified in the O&M agreement. Operation...

  10. The role of flight progress strips in en route air traffic control : a time-series analysis.

    DOT National Transportation Integrated Search

    1995-01-01

    Paper flight progress strips (FPSs) are currently used in the United States en route air traffic control system to document flight information. Impending automation will replace these paper strips with electronic flight data entries. In this observat...

  11. Carbon offsets from improved swine manure management using aerobic treatment technology

    USDA-ARS?s Scientific Manuscript database

    Aerobic treatment of manure is an accepted manure management system under protocols adopted through the United Nations Framework Convention on Climate Change (UNFCCC). Our objectives were to determine greenhouse gas (GHG) emission reductions from replacement of anaerobic lagoons with aerobic treatme...

  12. Orbiter Auxiliary Power Unit Flight Support Plan

    NASA Technical Reports Server (NTRS)

    Guirl, Robert; Munroe, James; Scott, Walter

    1990-01-01

    This paper discussed the development of an integrated Orbiter Auxiliary Power Unit (APU) and Improved APU (IAPU) Flight Suuport Plan. The plan identifies hardware requirements for continued support of flight activities for the Space Shuttle Orbiter fleet. Each Orbiter vehicle has three APUs that provide power to the hydraulic system for flight control surface actuation, engine gimbaling, landing gear deployment, braking, and steering. The APUs contain hardware that has been found over the course of development and flight history to have operating time and on-vehicle exposure time limits. These APUs will be replaced by IAPUs with enhanced operating lives on a vehicle-by-vehicle basis during scheduled Orbiter modification periods. This Flight Support Plan is used by program management, engineering, logistics, contracts, and procurement groups to establish optimum use of available hardware and replacement quantities and delivery requirements for APUs until vehicle modifications and incorporation of IAPUs. Changes to the flight manifest and program delays are evaluated relative to their impact on hardware availability.

  13. An electric artificial heart for clinical use.

    PubMed Central

    Pierce, W S; Rosenberg, G; Snyder, A J; Pae, W E; Donachy, J H; Waldhausen, J A

    1990-01-01

    Advances in microelectronics, high-strength magnets, and control system design now make replacement of the heart using an implantable, electrically powered pump feasible. The device described herein is a compact, dual pusher plate unit with valved polyurethane sac-type ventricles positioned at either end. The power unit consists of a small, brushless direct current motor and a motion translator. A microprocessor control system is used to regulate heart beat rate and provide left-right output balance. Bench studies lasting for as long as 1 year have been performed. Heart replacement with the electric heart has been performed in 18 calves since 1984. The longest survivor lived for more than 7 months. Among the causes of termination were component failure, thromboembolic complications, and bleeding. No major problem has been identified that precludes prolonged use of the electric heart. In the future the patient with end-stage heart disease will have an electric artificial heart as one therapeutic option. Images Figs. 1A and 1B. Fig. 3. Fig. 5. PMID:2396885

  14. Development of 10B-Based 3He Replacement Neutron Detectors

    NASA Astrophysics Data System (ADS)

    King, Michael J.; Gozani, Tsahi; Hilliard, Donald B.

    2011-12-01

    Radiation portal monitors (RPM) are currently deployed at United States border crossings to passively inspect vehicles and persons for any emission of neutrons and/or gamma rays, which may indicate the presence of unshielded nuclear materials. The RPM module contains an organic scintillator with 3He proportional counters to detect gamma rays and thermalized neutrons, respectively. The supply of 3He is rapidly dwindling, requiring alternative detectors to provide the same function and performance. Our alternative approach is one consisting of a thinly-coated 10B flat-panel ionization chamber neutron detector that can be deployed as a direct drop-in replacement for current RPM 3He detectors. The uniqueness of our approach in providing a large-area detector is in the simplicity of construction, scalability of the unit cell detector, ease of adaptability to a variety of applications and low cost. Currently, Rapiscan Laboratories and Helicon Thin Film Systems have designed and developed an operational 100 cm2 multi-layer prototype 10BB-based ionization chamber.

  15. Crystallization, X-ray diffraction analysis and preliminary structure determination of the polygalacturonase PehA from Agrobacterium vitis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vordtriede, Paul B.; Yoder, Marilyn D., E-mail: yoderm@umkc.edu

    2008-07-01

    The acidic polygalacturonase PehA from A. vitis has been crystallized. A molecular-replacement solution indicated a right-handed parallel β-helix fold. Polygalacturonases are pectate-degrading enzymes that belong to glycoside hydrolase family 28 and hydrolyze the α-1,4 glycosidic bond between neighboring galacturonasyl residues of the homogalacturonan substrate. The acidic polygalacturonase PehA from Agrobacterium vitis was overexpressed in Escherichia coli, where it accumulated in the periplasmic fraction. It was purified to homogeneity via a two-step chromatography procedure and crystallized using the hanging-drop vapour-diffusion technique. PehA crystals belonged to space group P2{sub 1}, with unit-cell parameters a = 52.387, b = 62.738, c = 149.165more » Å, β = 89.98°. Crystals diffracted to 1.59 Å resolution and contained two molecules per asymmetric unit. An initial structure determination by molecular replacement indicated a right-handed parallel β-helix fold.« less

  16. Crystallization and preliminary X-ray diffraction studies of NP24-I, an isoform of a thaumatin-like protein from ripe tomato fruits

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghosh, Raka; Chakrabarti, Chandana, E-mail: chandana.chakrabarti@saha.ac.in

    2005-08-01

    A thaumatin-like antifungal protein, NP24-I, has been isolated from ripe tomato fruits. It was crystallized by the vapour-diffusion method and data were collected to 2.45 Å. The structure was solved by molecular replacement. NP24 is a 24 kDa (207-amino-acid) antifungal thaumatin-like protein (TLP) found in tomato fruits. An isoform of the protein, NP24-I, is reported to play a possible role in ripening of the fruit in addition to its antifungal properties. The protein has been isolated and purified and crystallized by the hanging-drop vapour-diffusion method. The crystals belong to the tetragonal space group P4{sub 3}, with unit-cell parameters a =more » b = 61.01, c = 62.90 Å and one molecule per asymmetric unit. X-ray diffraction data were processed to a resolution of 2.45 Å and the structure was solved by molecular replacement.« less

  17. The effect of fish meal replacement by soyabean products on fish growth: a meta-analysis.

    PubMed

    Sales, James

    2009-12-01

    Meta-analysis was applied to quantify the effect of replacement of fish meal by soyabean products in diets on fish growth. Measurement of growth in different units among studies required the use of a standardised effect size (Hedges' d). From a total of ninety-nine studies concentrating on fish meal replacement by defatted soyabean meal, 53 % were eliminated due to, among others, absence of a fish meal control diet (n 18), or no statistical differences or measurement of dispersion (n 6) indicated. Replacement of 4 to 40 % fish meal by soyabean meal (inclusion levels of 71-366 g/kg) resulted in a mean effect size of - 0.1142 (95 % CI - 0.4665, 0.2382) obtained in forty-eight comparisons evaluated with seventeen different fish species. However, at higher fish meal replacement levels the 95 % CI calculated for combined effect sizes did not overlap with zero. With soya protein concentrate replacing 25 to 100 % of fish meal in diets for seven fish species, methionine supplementation (mean - 2.4373 (95 % CI - 3.9004, - 0.9742); n 10) did not have a substantial influence on the magnitude of cumulative effect sizes relative to no supplementation (mean - 2.7306 (95 % CI - 3.7991, - 1.6620); n 16). Information on other soyabean products (full-fat soyabeans, soya flour) used as protein sources in fish diets was found as too limited for analysis and definite conclusions. The present study contributes by putting a numerical value to the magnitude of growth differences in fish when replacing dietary fish meal by soyabean products.

  18. Collaborative study for the calibration of a replacement International Standard for Tetanus Toxoid Adsorbed.

    PubMed

    Tierney, Rob; Stickings, Paul; Hockley, Jason; Rigsby, Peter; Iwaki, Masaaki; Sesardic, Dorothea

    2011-11-01

    We present the results of a collaborative study for the establishment of a replacement International Standard (IS) for Tetanus Toxoid Adsorbed. Two candidate preparations were included in the study, one of which was established as the 4th IS for Tetanus Toxoid Adsorbed at the WHO Expert Committee on Biological Standardization meeting in October 2010. This preparation was found to have a unitage of 490 IU/ampoule, based on calibration in guinea pig challenge assays. Results from mouse challenge assays suggest that the relative performance of two candidate preparations may differ significantly between guinea pigs and mice. The authors note that the number of laboratories that performed guinea pig challenge assays, which are used to calibrate and assign IU, is much lower than in previous collaborative studies and this may have implications for calibration of replacement standards in the future. The issue of assigning separate units to the IS for guinea pig and mouse assays is discussed. The study also assessed performance of the replacement standard in serological assays which are used as alternative procedures to challenge assays for tetanus potency testing. Results suggest that the replacement standard is suitable for use as the reference vaccine in serological assays. Copyright © 2011 The International Alliance for Biological Standardization. Published by Elsevier Ltd. All rights reserved.

  19. Acoustical renovation of temporary classrooms to meet American National Standards Institute (ANSI) standard

    NASA Astrophysics Data System (ADS)

    Lubman, David

    2005-09-01

    This exercise demonstrates that key requirements of the ANSI S12.60-2002 on classroom acoustics can be met through renovations at modest cost. Free-standing classrooms at two schools in Southern California were successfully renovated. Noise levels were greatly reduced, and now meet requirements of the ANSI standard. A 1950s style bungalow classroom at the Paradise Canyon School (PCS) in Los Angeles County and a double-trailer classroom at the Wildomar Elementary School (WES) in Riverside County were targeted. The aim was to make classrooms suitable for pupils with severe hearing disabilities. But the methods used apply equally to mainstream classrooms. At both schools the above-ceiling air distribution systems were modified to produce quiet airflow. At PCS, a noisy rooftop heat pump was replaced with a much quieter rooftop heat pump and installation. At WES, a noisy wall-mounted heat pump was replaced with a new unit mounted on an exterior concrete pad. At PCS, exterior noise intrusion was achieved by replacing a poorly performing accordion wall with a permanent wall. Further noise reduction can be achieved by replacing leaky windows. Exterior noise intrusion at WES was obtained by replacing leaky windows. The resulting acoustical improvements are documented. Costs and lessons learned are discussed.

  20. STS-109 Crew Interviews - Linnehan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    STS-109 Mission Specialist 3 (MS3) Richard M. Linnehan is seen during a prelaunch interview. He answers questions about his lifelong desire to become an astronaut and his career path, which included becoming a zoo veterinarian. He gives details on the Columbia Orbiter mission, which has as its main purpose the maintenance and augmentation of the Hubble Space Telescope (HST). As MS3, his primary role in the mission pertains to EVAs (Extravehicular Activities) 1, 3, and 5. During EVA 1, Linnehan and another crewmember will replace one of two flexible solar arrays on the HST with a smaller, more efficient rigid solar array. The second solar array will be replaced on EVA 2 by other crewmembers. EVA 3 will involve the replacement of the Power Control Unit (PCU), and will require the first complete powering down of HST since its deployment. The possibility of a serious problem occurring is greatest during this portion of the mission because the original PCU was not built to be replaced. In EVA 5, Linnehan and another crewmember will install a replacement cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer), which has not been operational. Linnehan discusses his role during the mission as well as that of his crewmates, and provides an abbreviated timeline, including possible contingencies.

  1. Greenhouse gas emissions from the treatment of household plastic containers and packaging: replacement with biomass-based materials.

    PubMed

    Yano, Junya; Hirai, Yasuhiro; Sakai, Shin-ichi; Tsubota, Jun

    2014-04-01

    The purpose of this study was to quantify the life-cycle greenhouse gas (GHG) emissions reduction that could be achieved by replacement of fossil-derived materials with biodegradable, biomass-based materials for household plastic containers and packaging, considering a variety of their treatment options. The biomass-based materials were 100% polylactide or a combination of polybutylene succinate adipate and polylactide. A scenario analysis was conducted considering alternative recycling methods. Five scenarios were considered: two for existing fossil-derived materials (the current approach in Japan) and the three for biomass-based materials. Production and waste disposal of 1 m(3) of plastic containers and packaging from households was defined as the functional unit. The results showed that replacement of fossil-derived materials with biomass-based materials could reduce life-cycle GHG emissions by 14-20%. Source separation and recycling should be promoted. When the separate collection ratio reached 100%, replacement with biomass-based materials could potentially reduce GHG emissions by 31.9%. Food containers are a priority for replacement, because they alone could reduce GHG emissions by 10%. A recycling system for biomass-based plastics must be carefully designed, considering aspects such as the transition period from fossil-derived plastics to biomass-based plastics.

  2. A Year in the Life of a Contaminated Heater-Cooler Unit With Mycobacterium chimaera?

    PubMed

    Garvey, Mark I; Bradley, Craig W; Walker, Jimmy

    2017-06-01

    OBJECTIVE Heater-cooler units (HCUs) have been shown to be a source of Mycobacterium chimaera infections. For the past year, weekly water samples have been taken from HCUs used at University Hospitals Birmingham (UHB) NHS Foundation Trust. We report the microbial contamination of the HCUs over a year detailing the decontamination regimes applied at UHB to reduce the microbial load. DESIGN Observational study SETTING UHB is a tertiary referral teaching hospital in Birmingham, United Kingdom, that provides clinical services to nearly 1 million patients every year. The UHB Cardiac department is one of the largest in the United Kingdom and provides treatment for adult patients with a wide range of cardiac diseases. METHODS Water samples taken from HCUs used at UHB for cardiopulmonary bypass surgery were sampled over a year to determine the number of microorganisms by membrane filtration. Various decontamination processes were employed throughout the year. RESULTS Varying total viable counts containing a wide variety of microorganisms were obtained from water inside the HCUs. No M. chimaera were isolated after replacement of the HCU internal tubing. Stringent decontamination regimes resulted in degradation of the HCUs and increased TVCs after several months. CONCLUSION More work is required to ensure effective decontamination processes to reduce the microbial load within the HCUs. Our studies indicate that weekly water sampling for TVC will be required indefinitely to monitor the water quality in these units as well as regular replacement of the tubing to control the build-up of biofilm. Infect Control Hosp Epidemiol 2017;38:705-711.

  3. Thermal oxidation saves $500,000, lifts capacity, upholds compliance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harley, C.G.; Nagy, A.J.; Sendecki, M.

    1985-12-01

    The age and destruction of the heat recovery system dictated the replacement of the original fume incinerator at the Congoleum Resilient Flooring Division Plant in Trenton, NJ. The original unit, installed in 1967, had a conventional air-to-oil heat recovery system. Plant personnel placed high priority on finding a replacement with a higher thermal efficiency while still maintaining environmental integrity. A proprietary software program was used to obtain values for NPV (net pressure value) for several competitive equipment systems. The NPV allows simple comparison of equipment based on data such as purchase pgsrice, cost of installation, operating costs, and maintenance costsmore » for the predicted life span of each unit. Based on NPV analysis, a regenerative thermal oxidation unit was selected. To assure expansion capability, Congoleum opted for a 30,000 scfm system. The regenerative thermal oxidation unit consists of a central combustion chamber with five lobes extending radially outward. Each lobe is packed with ceramic refractory elements (saddles) which serve as heat exchange media. The elements are retained by perforated refractory blocks on the hot combustion chamber side and by a grating on the cold side. Estimated savings from the system, about a half million dollars the first year, are expected to significantly exceed Congoleum's original estimates. About half of the total savings will result from reduced consumption of natural gas since the unit is fueled mainly by the organic material in the process exhaust. The other half of the savings has resulted from improvements in production efficiency and the recycling of waste heat from the thermal oxidizer.« less

  4. Applied Meteorology Unit (AMU)

    NASA Technical Reports Server (NTRS)

    Bauman, William H., Jr.; Crawford, Winifred; Short, David; Barrett, Joe; Watson, Leela

    2008-01-01

    This report summarizes the Applied Meteorology Unit (AMU) activities for the second quarter of Fiscal Year 2008 (January - March 2008). Projects described are: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Peak Wind Tool for General Forecasting, (3) Situational Lightning Climatologies for Central Florida. Phase III, (4) Volume Averaged Height Integrated Radar Reflectivity (VAHIRR), (5) Impact of Local Sensors, (6) Radar Scan Strategies for the PAFB WSR-74C Replacement and (7) WRF Wind Sensitivity Study at Edwards Air Force Base.

  5. The Effect of Personnel Stability on Organizational Performance: Do Battalions with Stable Command Groups Achieve Higher Training Proficiency at the National Training Center?

    DTIC Science & Technology

    2008-01-01

    Graduate School and the students they work with on a routine basis. All three of my committee members have been superb mentors in helping me develop the...Deployable” and “Individual Replacement Induced Non-Deployable.” Wartime non-deployable status is provided to soldiers who are unavailable due to medical ...responder medical tasks, mastery of communication systems, and basic reporting requirements. The unit can progress to small-unit level collective training

  6. Improving gas dehydrator efficiency; Glycol losses from dehydrator solved by mist eliminator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franke, S.; Neal, R.; Patel, K.

    1989-07-01

    Triethylene glycol losses from a natural gas dehydrator unit were costing Winnie Pipeline Co. well over $100/day. Several possible causes had been investigated, and a second, smaller unit had been added because insufficient capacity was thought to cause glycol carryover from the contactor. Eventually, glycol losses were virtually eliminated by replacing the standard mist eliminator pad in the top of the contactor tower with a higher-efficiency type. Use of this type of pad is discussed in this paper.

  7. KSC-2009-2521

    NASA Image and Video Library

    2009-04-02

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians help with the installation of the Science Instrument Command and Data Handling Unit, or SIC&DH, on the Multi-Use Lightweight Equipment Carrier. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis

  8. KSC-2009-2520

    NASA Image and Video Library

    2009-04-02

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians help with the installation of the Science Instrument Command and Data Handling Unit, or SIC&DH, on the Multi-Use Lightweight Equipment Carrier. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis

  9. KSC-2009-2522

    NASA Image and Video Library

    2009-04-02

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians look over the Science Instrument Command and Data Handling Unit, or SIC&DH, installed on the Multi-Use Lightweight Equipment Carrier. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis

  10. KSC-2009-2523

    NASA Image and Video Library

    2009-04-02

    CAPE CANAVERAL, Fla. – In the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians check the Multi-Use Lightweight Equipment Carrier where the Science Instrument Command and Data Handling Unit, or SIC&DH, is being installed. The SIC&DH will be installed on the Hubble Space Telescope during space shuttle Atlantis' STS-125 mission. This unit will replace the one that suffered a failure aboard the orbiting telescope on Sept. 27, 2008. Atlantis is targeted for launch on May 12. Photo credit: NASA/Dimitri Gerondidakis

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Fu-Peng; Un, Hio-Ieng; Li, Yongxi

    A new electron-deficient unit with fused 5-heterocyclic ring was developed by replacing a cyclopenta-1,3-diene from electron-rich donor indacenodithiophene (IDT) with cyclohepta- 4,6-diene-1,3-diimde unit. The imide bridging endows BBI with fixed planar configuration and both low the highest occupied molecular orbital (HOMO) and the lowest unoccupied molecular orbit (LUMO) energy levels. Organic field-effect transistors (OFETs) based on BBI polymers exhibit electron mobility up to 0.34 cm2 V-1 s-1, which indicates that the BBI is a promising ntype semiconductor for optoelectronics.

  12. The Impact of Political-Military Relations on the Use of German Military Power during Operation Barbarossa

    DTIC Science & Technology

    2007-06-15

    Germany’s rearmament the Waffen -SS divisions began to receive priority in military equipment and personnel. Hitler placed more faith in the...Party’s army than the regular army. By War’s end in 1945 Himmler had control of over forty two Waffen -SS units, a significant number considering the...Army, efforts to micromanage the war, and event decision to replace army units with Waffen SS stemmed from this divergence. The problem worsened as

  13. A new multiprogrammable isotopic powered cardiac pacemaker

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smyth, N.P.; Purdy, D.L.; Sager, D.

    1982-09-01

    A new multiprogrammable, isotopic-powered cardiac pacemaker was implanted in six patients as a custom device. Five were initial implants and one was a replacement. The patients were studied for up to two years. In five of the six cases it was found advantageous to change one of the programmable parameters. Multiprogrammability is obviously as important in an isotopic pulse generator as in a lithium unit, if not more so, because of the unit's greater longevity. Further studies are continuing in an FDA approved clinical trial.

  14. The cost of cardiac surgery.

    PubMed Central

    Monro, J L; Mollo, S; Brookbanks, S; Conway, N; Ross, J K

    1978-01-01

    A study in Wessex has shown that at 1977 prices, and excluding the cost of equipment already installed in the unit, the cost of replacing a man's aortic valve in this unit is about 1800 pounds. Nevertheless, this seems a small price to pay for return to health and full working capacity, particularly since such patients no longer need to draw social security benefits and their tax contributions will return to normal, thus probably paying for the operation within two years. PMID:418846

  15. Demonstration of Advanced Geophysics and Classification Methods on Munitions Response Sites: Closed Castner Range Fort Bliss, TX

    DTIC Science & Technology

    2016-04-01

    Program ft foot/feet GPS Global Positioning System HE High Explosive ID Identification IDA Institute for Defense Analysis IMU Inertial Measurement Unit ISO...were replaced with two ski-shaped runners, and a new mount above the array was used to hold the Inertial Measurement Unit (IMU) and Trimble R8 Real...to collect a cued data measurement (Figure 9). The instrument’s pitch, roll , and yaw angles automatically were measured by the IMU. These angles and

  16. The Extravehicular Maneuvering Unit's New Long Life Battery and Lithium Ion Battery Charger

    NASA Technical Reports Server (NTRS)

    Russell, Samuel P.; Elder, Mark A.; Williams, Anthony G.; Dembeck, Jacob

    2010-01-01

    The Long Life (Lithium Ion) Battery is designed to replace the current Extravehicular Mobility Unit Silver/Zinc Increased Capacity Battery, which is used to provide power to the Primary Life Support Subsystem during Extravehicular Activities. The Charger is designed to charge, discharge, and condition the battery either in a charger-strapped configuration or in a suit-mounted configuration. This paper will provide an overview of the capabilities and systems engineering development approach for both the battery and the charger

  17. FASEA: A FPGA Acquisition System and Software Event Analysis for liquid scintillation counting

    NASA Astrophysics Data System (ADS)

    Steele, T.; Mo, L.; Bignell, L.; Smith, M.; Alexiev, D.

    2009-10-01

    The FASEA (FPGA based Acquisition and Software Event Analysis) system has been developed to replace the MAC3 for coincidence pulse processing. The system uses a National Instruments Virtex 5 FPGA card (PXI-7842R) for data acquisition and a purpose developed data analysis software for data analysis. Initial comparisons to the MAC3 unit are included based on measurements of 89Sr and 3H, confirming that the system is able to accurately emulate the behaviour of the MAC3 unit.

  18. Biological Research in Canisters (BRIC) - Light Emitting Diode (LED)

    NASA Technical Reports Server (NTRS)

    Levine, Howard G.; Caron, Allison

    2016-01-01

    The Biological Research in Canisters - LED (BRIC-LED) is a biological research system that is being designed to complement the capabilities of the existing BRIC-Petri Dish Fixation Unit (PDFU) for the Space Life and Physical Sciences (SLPS) Program. A diverse range of organisms can be supported, including plant seedlings, callus cultures, Caenorhabditis elegans, microbes, and others. In the event of a launch scrub, the entire assembly can be replaced with an identical back-up unit containing freshly loaded specimens.

  19. Aquarium Microbiome Response to Ninety-Percent System Water Change: Clues to Microbiome Management

    PubMed Central

    Van Bonn, William; LaPointe, Allen; Gibbons, Sean M.; Frazier, Angel; Hampton-Marcell, Jarrad; Gilbert, Jack

    2016-01-01

    The bacterial community composition and structure of water from an established teleost fish system was examined before, during and after a major water change to explore the impact of such a water-change disturbance on the stability of the aquarium water microbiome. The diversity and evenness of the bacterial community significantly increased following the 90% water replacement. While the change in bacterial community structure was significant, it was slight, and was also weakly correlated with changes in physicochemical parameters. Interestingly there was a significant shift in the correlative network relationships between operational taxonomic units from before to after the water replacement. We suggest this shift in network structure is due to the turnover of many taxa during the course of water replacement. These observations will inform future studies into manipulation of the microbiome by changing system environmental parameter values to optimize resident animal health. PMID:26031788

  20. Evaluation of ultrasonic cavitation of metallic and non-metallic surfaces

    NASA Technical Reports Server (NTRS)

    Mehta, Narinder K.

    1992-01-01

    1,1,2 trichloro-1,2,2 trifluoro ethane (CFC-113) commercially known as Freon-113 is the primary test solvent used for validating the cleaned hardware at the Kennedy Space Center (KSC). Due to the ozone depletion problem, the current United States policy calls for the phase out of Freons by 1995. NASAs chlorofluorocarbon (CFC) replacement group at KSC has opted to use water as a replacement fluid for the validation process since water is non-toxic, inexpensive, and is environmentally friendly. The replacement validation method calls for the ultrasonification of the small parts with water at 52 C for a cycle or two of 10 min duration wash using commercial ultrasonic baths. In this project, experimental data was obtained to assess the applicability of the proposed validation method for any damage of the metallic and non-metallic surfaces resulting from ultrasonic cavitation.

Top