ERIC Educational Resources Information Center
Mumford, Michael D.; And Others
A multivariate modeling approach was developed to assess the impact of changes in aptitude requirement minimums on U.S. Air Force technical training outcomes. Initially, interviews were conducted with technical training personnel to identify significant student inputs, course content, and training outcome variables. Measures of these variables…
ERIC Educational Resources Information Center
Miller, Debra K.; Mupinga, Davison M.
2006-01-01
Private and public 2-year technical colleges survive side-by-side within the same communities. However, little is known about their characteristics, similarities and differences. The question is whether the 2-year technical institutions are duplicating each other, or are they significantly different in their missions, admission requirements,…
A Review of Legal Decisions Relevant to Technical Standards Used in Pharmacy School Admissions
2017-01-01
The implementation of an effective and legally sound technical standards procedure for pharmacy schools requires a proactive approach by admissions officers. Applicants with disabilities are accorded significant rights that must not be infringed during the admissions process in order to ensure compliance with applicable law. This article provides a review of applicable state cases, federal cases, and OCR decisions and guidance to help pharmacy schools identify procedures and implement technical standards into their admissions processes as required by ACPE Standards 2016. PMID:28381897
Technical parameters for specifying imagery requirements
NASA Technical Reports Server (NTRS)
Coan, Paul P.; Dunnette, Sheri J.
1994-01-01
Providing visual information acquired from remote events to various operators, researchers, and practitioners has become progressively more important as the application of special skills in alien or hazardous situations increases. To provide an understanding of the technical parameters required to specify imagery, we have identified, defined, and discussed seven salient characteristics of images: spatial resolution, linearity, luminance resolution, spectral discrimination, temporal discrimination, edge definition, and signal-to-noise ratio. We then describe a generalizing imaging system and identified how various parts of the system affect the image data. To emphasize the different applications of imagery, we have constrasted the common television system with the significant parameters of a televisual imaging system for technical applications. Finally, we have established a method by which the required visual information can be specified by describing certain technical parameters which are directly related to the information content of the imagery. This method requires the user to complete a form listing all pertinent data requirements for the imagery.
FLAMMABLE GAS TECHNICAL BASIS DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
KRIPPS, L.J.
2005-02-18
This document describes the qualitative evaluation of frequency and consequences for double shell tank (DST) and single shell tank (SST) representative flammable gas accidents and associated hazardous conditions without controls. The evaluation indicated that safety-significant SSCs and/or TSRS were required to prevent or mitigate flammable gas accidents. Discussion on the resulting control decisions is included. This technical basis document was developed to support of the Tank Farms Documented Safety Analysis (DSA) and describes the risk binning process for the flammable gas representative accidents and associated represented hazardous conditions. The purpose of the risk binning process is to determine the needmore » for safety-significant structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls for a given representative accident or represented hazardous condition based on an evaluation of the event frequency and consequence.« less
The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration
NASA Technical Reports Server (NTRS)
McGhee, D. S.
2006-01-01
Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful
NASA Astrophysics Data System (ADS)
Jin, Huang; Ling, Lin; Jun, Guo; Jianguo, Li; Yongzhong, Wang
2017-11-01
Facing the increasingly severe situation of air pollution, China are now positively promoting the evaluation of high efficiency air pollution control equipments and the research of the relative national standards. This paper showed the significance and the effect of formulating the technical requirements of high efficiency precipitator equipments for assessment national standards in power industries as well as the research thoughts and principle of these standards. It introduce the qualitative and quantitative evaluation requirements of high efficiency precipitators using in power industries and the core technical content such as testing, calculating, evaluation methods and so on. The implementation of a series of national standards is in order to lead and promote the production and application of high efficiency precipitator equipments in the field of the prevention of air pollution in national power industries.
Turnaround operations analysis for OTV. Volume 2: Detailed technical report
NASA Technical Reports Server (NTRS)
1988-01-01
The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.
Lunar mission safety and rescue: Technical summary
NASA Technical Reports Server (NTRS)
1971-01-01
A technical summary is presented of the escape/rescue and the hazards analyses for manned missions and operations in the 1980 time frame. Hazards are interpreted as hazards to man, not to equipment, program schedule, or program objectives. Hazards in 39 individual areas are analyzed, and corrective measures are recommended. Over 200 safety guidelines are proposed, based on significant hazards. Escape and rescue situtations and requirements are identified and analyzed, and escape/survival/rescue concepts are defined to cope with each escape/rescue situation. Areas in which research or technical development efforts could improve mission safety are identified. It is concluded that the primary emphasis should be on survival and escape provisions, with rescue required only where self-help cannot bring the endangered crewmen to a safe haven.
ACE: A distributed system to manage large data archives
NASA Technical Reports Server (NTRS)
Daily, Mike I.; Allen, Frank W.
1993-01-01
Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.
Code of Federal Regulations, 2013 CFR
2013-07-01
... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...
Code of Federal Regulations, 2011 CFR
2011-07-01
... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...
Code of Federal Regulations, 2014 CFR
2014-07-01
... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...
Code of Federal Regulations, 2012 CFR
2012-07-01
... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...
Code of Federal Regulations, 2010 CFR
2010-07-01
... composed letter 165 5 Information and assistance that re- quires significant file search or retrieval of...) Level 1 includes the provision of basic information from readily available data that does not require... includes the provision of information from readily available data that requires minimal technical...
Riem, N; Boet, S; Bould, M D; Tavares, W; Naik, V N
2012-11-01
Both technical skills (TS) and non-technical skills (NTS) are key to ensuring patient safety in acute care practice and effective crisis management. These skills are often taught and assessed separately. We hypothesized that TS and NTS are not independent of each other, and we aimed to evaluate the relationship between TS and NTS during a simulated intraoperative crisis scenario. This study was a retrospective analysis of performances from a previously published work. After institutional ethics approval, 50 anaesthesiology residents managed a simulated crisis scenario of an intraoperative cardiac arrest secondary to a malignant arrhythmia. We used a modified Delphi approach to design a TS checklist, specific for the management of a malignant arrhythmia requiring defibrillation. All scenarios were recorded. Each performance was analysed by four independent experts. For each performance, two experts independently rated the technical performance using the TS checklist, and two other experts independently rated NTS using the Anaesthetists' Non-Technical Skills score. TS and NTS were significantly correlated to each other (r=0.45, P<0.05). During a simulated 5 min resuscitation requiring crisis resource management, our results indicate that TS and NTS are related to one another. This research provides the basis for future studies evaluating the nature of this relationship, the influence of NTS training on the performance of TS, and to determine whether NTS are generic and transferrable between crises that require different TS.
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 76.87 - Technical safety requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Technical safety requirements. 76.87 Section 76.87 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Safety § 76.87 Technical safety requirements. (a) The Corporation shall establish technical safety requirements. In...
10 CFR 830.205 - Technical safety requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2010-01-01 2010-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...
10 CFR 830.205 - Technical safety requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must: (1) Develop technical safety requirements that are derived from the documented safety analysis... 10 Energy 4 2011-01-01 2011-01-01 false Technical safety requirements. 830.205 Section 830.205 Energy DEPARTMENT OF ENERGY NUCLEAR SAFETY MANAGEMENT Safety Basis Requirements § 830.205 Technical...
40 CFR 25.4 - Information, notification, and consultation responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., consistent with applicable statutory requirements, the social, economic, and environmental consequences of... complex technical materials that relate to significant decisions should be summarized for public and media... media in advance of times at which major decisions not covered by notice requirements for public...
40 CFR 25.4 - Information, notification, and consultation responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., consistent with applicable statutory requirements, the social, economic, and environmental consequences of... complex technical materials that relate to significant decisions should be summarized for public and media... media in advance of times at which major decisions not covered by notice requirements for public...
40 CFR 25.4 - Information, notification, and consultation responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., consistent with applicable statutory requirements, the social, economic, and environmental consequences of... complex technical materials that relate to significant decisions should be summarized for public and media... media in advance of times at which major decisions not covered by notice requirements for public...
40 CFR 25.4 - Information, notification, and consultation responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., consistent with applicable statutory requirements, the social, economic, and environmental consequences of... complex technical materials that relate to significant decisions should be summarized for public and media... media in advance of times at which major decisions not covered by notice requirements for public...
40 CFR 25.4 - Information, notification, and consultation responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., consistent with applicable statutory requirements, the social, economic, and environmental consequences of... complex technical materials that relate to significant decisions should be summarized for public and media... media in advance of times at which major decisions not covered by notice requirements for public...
2013-06-01
math (Lasley- Hunter, 2011, p. 30–31). The significance of this finding stems from the fact that education is one of three components of DAWIA...II CLE 003 Technical Reviews SYS 302 Technical Leadership in Systems Engineering CLL 008 Designing for Supportability in DoD Systems DAU SPRDE‐SE
Metrology requirements for the serial production of ELT primary mirror segments
NASA Astrophysics Data System (ADS)
Rees, Paul C. T.; Gray, Caroline
2015-08-01
The manufacture of the next generation of large astronomical telescopes, the extremely large telescopes (ELT), requires the rapid manufacture of greater than 500 1.44m hexagonal segments for the primary mirror of each telescope. Both leading projects, the Thirty Meter Telescope (TMT) and the European Extremely Large Telescope (E-ELT), have set highly demanding technical requirements for each fabricated segment. These technical requirements, when combined with the anticipated construction schedule for each telescope, suggest that more than one optical fabricator will be involved in the delivery of the primary mirror segments in order to meet the project schedule. For one supplier, the technical specification is challenging and requires highly consistent control of metrology in close coordination with the polishing technologies used in order to optimize production rates. For production using multiple suppliers, however the supply chain is structured, consistent control of metrology along the supply chain will be required. This requires a broader pattern of independent verification than is the case of a single supplier. This paper outlines the metrology requirements for a single supplier throughout all stages of the fabrication process. We identify and outline those areas where metrology accuracy and duration have a significant impact on production efficiency. We use the challenging ESO E-ELT technical specification as an example of our treatment, including actual process data. We further develop this model for the case of a supply chain consisting of multiple suppliers. Here, we emphasize the need to control metrology throughout the supply chain in order to optimize net production efficiency.
[Discuss about Alarm Requirements of Standards for Tests of Patient Monitor].
Feng, Ting
This paper introduces the alarm requirements of standards of patient monitor and expounds their significance for tests and guidance for patient monitor, then discusses whether technical alarm should not be closed and it latching alarm and non-latching alarm can not exist together.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rhinefrank, Kenneth; Lamb, Bradford; Prudell, Joseph
This Project aims to satisfy objectives of the DOE’s Water Power Program by completing a system detailed design (SDD) and other important activities in the first phase of a utility-scale grid-connected ocean wave energy demonstration. In early 2012, Columbia Power (CPwr) had determined that further cost and performance optimization was necessary in order to commercialize its StingRAY wave energy converter (WEC). CPwr’s progress toward commercialization, and the requisite technology development path, were focused on transitioning toward a commercial-scale demonstration. This path required significant investment to be successful, and the justification for this investment required improved annual energy production (AEP) andmore » lower capital costs. Engineering solutions were developed to address these technical and cost challenges, incorporated into a proposal to the US Department of Energy (DOE), and then adapted to form the technical content and statement of project objectives of the resulting Project (DE-EE0005930). Through Project cost-sharing and technical collaboration between DOE and CPwr, and technical collaboration with Oregon State University (OSU), National Renewable Energy Lab (NREL) and other Project partners, we have demonstrated experimentally that these conceptual improvements have merit and made significant progress towards a certified WEC system design at a selected and contracted deployment site at the Wave Energy Test Site (WETS) at the Marine Corps Base in Oahu, HI (MCBH).« less
78 FR 18526 - Significant New Use Rules on Certain Chemical Substances; Technical Amendment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
... aromatic sulfonic acid amino azo dye salts (PMN P-12-276) a typographical error has been identified. This... significant new uses for aromatic sulfonic acid amino azo dye salts, EPA inadvertently listed the respirator... include this requirement when promulgating the significant new uses for aromatic sulfonic acid amino azo...
Technical aspects of contrast-enhanced ultrasound (CEUS) examinations: tips and tricks.
Greis, C
2014-01-01
Ultrasound contrast agents have substantially extended the clinical value of ultrasound, allowing the assessment of blood flow and distribution in real-time down to microcapillary level. Selective imaging of contrast agent signals requires a contrast-specific imaging mode on the ultrasound scanner, allowing real-time separation of tissue and contrast agent signals. The creation of a contrast image requires a specific interaction between the insonated ultrasound wave and the contrast agent microbubbles, leading to persistent oscillation of the bubbles. Several technical and procedural parameters have a significant influence on the quality of CEUS images and should be controlled carefully to obtain good image quality and a reliable diagnosis. Achieving the proper balance between the respective parameters is a matter of technical knowledge and experience. Appropriate training and education should be mandatory for every investigator performing CEUS examinations.
The effect of gender on early and intermediate results of endovascular aneurysm repair.
Nordness, Paul J; Carter, Glen; Tonnessen, Britt; Charles Sternbergh, W; Money, Samuel R
2003-11-01
Results of endovascular aneurysm repair (EVAR) may be gender dependent. Between September 1997 and September 2001, 118 AneuRx aortic grafts were placed for aneurysmal disease. During this period, 17 females and 101 males were treated with this device. A prospective database was maintained and supplemented with retrospectively gathered information to evaluate early and mid-term end points. A total of 113 devices were deployed in 118 attempts. Length of procedure was greater for females (3.3 +/- 1.75 vs. 2.3 +/- 0.8 hr, p = 0.05) and they were more likely to have significant arterial dissections (12% vs. 1%, p = 0.05). The mortality rates at 1 month were 12% for females and 0% for males ( p = 0.02); the complication rates at 1 month were 41% for females and 15% for males ( p = 0.02). Although technical success was not significantly different between the sexes, assisted primary technical success (requiring endovascular assistance) and assisted secondary technical success (requiring open surgical assistance) were significantly different (71% vs. 96%, p = 0.003; and 76% vs. 98%, p = 0.004, respectively). Clinical success at 1 month was 59% for females and 84% for males ( p = 0.02). This difference was also significant when assessing 1-month assisted primary clinical success (59% vs. 90%, p = 0.003) and assisted secondary clinical success as well (71% vs. 96%, p = 0.003). Clinical success and assisted primary clinical success were not different at 6- or 12-month intervals, however, assisted secondary clinical successes differed at both time intervals (56% vs. 83%, p = 0.02; and 56% vs. 81%, p = 0.05, respectively). As-yet undetermined factors appear to predispose females to complications and technical difficulties in the short term. Endovascular and open procedures required to achieve ongoing clinical success in the following months appear to favor males to a greater degree than females.
ERIC Educational Resources Information Center
Zirkle, Christopher J.; Jeffery, Jeremy O.
2017-01-01
The current climate of career and technical administration requirements in all 50 states was detailed and explored. An increasing number of states are not requiring specific career-technical administration certification/licensure in order to oversee secondary career and technical education (CTE) programs, with more states moving towards a general…
North, Richard B; Kidd, David H; Olin, John; Sieracki, Jeffrey M; Farrokhi, Farrokh; Petrucci, Loredana; Cutchis, Protagoras N
2005-06-15
A prospective, controlled, clinical trial comparing single and dual percutaneous electrodes in the treatment of axial low back pain from failed back surgery syndrome. To clarify technical requirements and test the hypothesis that placing two linear arrays in parallel, thereby doubling the number of contacts, improves outcome. Technical improvements have enhanced outcomes of spinal cord stimulation for chronic axial low back pain. Dual, parallel electrodes reportedly improve these outcomes. Acting as their own controls, 20 patients who passed screening with single, 4-contact electrodes received permanent dual, 4-contact electrodes with 7- or 10-mm intercontact distances at the same vertebral level(s). We quantified and compared the technical and clinical results of the single and dual electrodes, adjusting stimulation parameters to specific psychophysical thresholds. Single electrodes provided significant (P < 0.01) advantages in patient- and computer-calculated ratings of pain coverage by paresthesias and in the scaled amplitude necessary to cover the low back, compared with dual 7-mm electrodes. Slight advantages without statistical significance were observed for the single over the dual 10-mm electrodes. Amplitude requirements were significantly lower for the single electrode than for either dual electrode. At long-term follow-up, 53% of patients met the criteria for clinical success. While we observed disadvantages for dual electrodes in treating axial low back pain, we achieved technical success with single or dual electrodes in most patients and maintained this success clinically with dual electrodes in 53%.
Pugh, Debra; Hamstra, Stanley J; Wood, Timothy J; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges
2015-03-01
Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal medicine (IM) residents to assess their technical and non-technical skills when performing procedures. Thirty-five first to third-year IM residents participated in a 5-station PS-OSCE, which combined partial task models, standardized patients, and allied health professionals. Formal blueprinting was performed and content experts were used to develop the cases and rating instruments. Examiners underwent a frame-of-reference training session to prepare them for their rater role. Scores were compared by levels of training, experience, and to evaluation data from a non-procedural OSCE (IM-OSCE). Reliability was calculated using Generalizability analyses. Reliabilities for the technical and non-technical scores were 0.68 and 0.76, respectively. Third-year residents scored significantly higher than first-year residents on the technical (73.5 vs. 62.2%) and non-technical (83.2 vs. 75.1%) components of the PS-OSCE (p < 0.05). Residents who had performed the procedures more frequently scored higher on three of the five stations (p < 0.05). There was a moderate disattenuated correlation (r = 0.77) between the IM-OSCE and the technical component of the PS-OSCE scores. The PS-OSCE is a feasible method for assessing multiple competencies related to performing procedures and this study provides validity evidence to support its use as an in-training examination.
Zhao, Peng; Sun, Meng-Xiang
2015-01-01
Fertilization marks the turnover from the gametophyte to sporophyte generation in higher plants. After fertilization, sporophytic development undergoes genetic turnover from maternal to zygotic control: the maternal-to-zygotic transition (MZT). The MZT is thought to be critical for early embryogenesis; however, little is known about the time course or developmental impact of the MZT in higher plants. Here, we discuss what is known in the field and focus on techniques used in relevant studies and their limitations. Some significant questions and technical requirements for further investigations are also discussed. © 2015 Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-10
... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Threshold requirements....52 Threshold requirements for technical assistance grant applications. To be eligible for a technical assistance grant, an applicant must meet the following threshold requirements: (a) The application included...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in the Satellite Digital Audio Radio Service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the Satellite Digital Audio Radio...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in the satellite digital audio radio service and associated terrestrial repeaters. 25.214 Section 25.214... Technical Standards § 25.214 Technical requirements for space stations in the satellite digital audio radio...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Preparation of technical...
48 CFR 2052.211-70 - Preparation of technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Preparation of technical...
Prep-ME Software Implementation and Enhancement : technical summary
DOT National Transportation Integrated Search
2017-09-01
Pavement ME Design (previously MEPDG/DARWin-ME) is a significant advancement in pavement design, though requiring more inputs from various sources. Through efforts by the Louisiana Transportation Research Center (LTRC) and Federal Highway Administrat...
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
47 CFR 80.273 - Technical requirements for radar equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...
47 CFR 80.273 - Technical requirements for radar equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements for radar equipment. 80... Technical requirements for radar equipment. (a) Radar installations on board ships that are required by the Safety Convention or the U.S. Coast Guard to be equipped with radar must comply with the documents...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
16 CFR 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
NASA Astrophysics Data System (ADS)
Gonzalez, J. C.; Kurlandczyk, H.; Schmid, C.; Schneller, D.
2016-08-01
One of the critical activities in the systems engineering scope of work is managing requirements. In line with this, E-ELT devotes a significant effort to this activity, which follows a well-established process. This involves optimally deriving requirements from the user (Top-Level Requirements) through the system Level 1 Requirements and from here down to subsystems procurement specifications. This paper describes the process, which is illustrated with some practical examples, including in particular the role of technical budgets to derive requirements on subsystems. Also, the provisions taken for the requirements verification are discussed.
47 CFR 15.15 - General technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.15 Section 15.15 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES General § 15.15 General technical requirements. (a) An intentional or unintentional radiator shall be...
47 CFR 80.659 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical requirements. 80.659 Section 80.659 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Maritime Support Stations § 80.659 Technical requirements. The authorized frequency...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2012 CFR
2012-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2010 CFR
2010-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2013 CFR
2013-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2011 CFR
2011-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
9 CFR 351.17 - Identification required.
Code of Federal Regulations, 2014 CFR
2014-01-01
... INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.17 Identification required. Certified technical animal fats... certified plants shall be accompanied by MP Form 85 (Declaration to Accompany Technical Animal Fats Between...
NASA Astrophysics Data System (ADS)
Vilja, John; Levack, Daniel
1993-04-01
The objectives were to assess what design changes would be required to remit late production of the J-2S engine for use as a large high energy upper stage engine. The study assessed design changes required to perform per the J-2S model specification, manufacturing changes required due to obsolescence or improvements in state-of-the-practice, availability issues for supplier provided items, and provided cost and schedule estimates for this configuration. The confidence that J-2S production could be reinitiated within reasonable costs and schedules was provided. No significant technical issues were identified in either the producibility study or in the review of previous technical data. Areas of potential cost reduction were identified which could be quantified to a greater extent with further manufacturing planning. The proposed schedule can be met with no foreseeable impacts. The results of the study provided the necessary foundation for the detailed manufacturing and test plans and non-recurring and recurring cost estimates that are needed to complete the effort to reinitiate production of the J-2S engine system.
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
A Handbook for Job Restructuring.
ERIC Educational Resources Information Center
Phillips, J. Edmund; And Others
Rapid changes in the nation's economy have resulted in significant increases in the demand for workers in technical jobs but a significant decrease in the demand for unskilled workers. Unfortunately, the abilities of available manpower have not been developed to meet the requirements of jobs at the levels where the increased demands have occurred.…
NASA Astrophysics Data System (ADS)
Vaganova, N. A.
2017-12-01
Technogenic and climatic influences have a significant impact on the degradation of permafrost. Long-term forecasts of such changes during long-time periods have to be taken into account in the oil and gas and construction industries in view to development the Arctic and Subarctic regions. There are considered constantly operating technical systems (for example, oil and gas wells) that affect changes in permafrost, as well as the technical systems that have a short-term impact on permafrost (for example, flare systems for emergency flaring of associated gas). The second type of technical systems is rather complex for simulation, since it is required to reserve both short and long-scales in computations with variable time steps describing the complex technological processes. The main attention is paid to the simulation of long-term influence on the permafrost from the second type of the technical systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed... Information Collection Title of Information Collection: Technical Processing Requirements for Multifamily...
Technical and economic feasibility study of solar/fossil hybrid power systems
NASA Technical Reports Server (NTRS)
Bloomfield, H. S.; Calogeras, J. E.
1977-01-01
Results show that new hybrid systems utilizing fossil fuel augmentation of solar energy can provide significant capital and energy cost benefits when compared with solar thermal systems requiring thermal storage. These benefits accrue from a reduction of solar collection area that results from both the use of highly efficient gas and combined cycle energy conversion subsystems and elimination of the requirement for long-term energy storage subsystems. Technical feasibility and fuel savings benefits of solar hybrid retrofit to existing fossil-fired, gas and vapor cycle powerplants was confirmed; however, economic viability of steam cycle retrofit was found to be dependent on the thermodynamic and operational characteristics of the existing powerplant.
Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device.
Picone, Rico A R; Davis, Solomon; Devine, Cameron; Garbini, Joseph L; Sidles, John A
2017-04-01
We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.
Instrumentation and control of harmonic oscillators via a single-board microprocessor-FPGA device
NASA Astrophysics Data System (ADS)
Picone, Rico A. R.; Davis, Solomon; Devine, Cameron; Garbini, Joseph L.; Sidles, John A.
2017-04-01
We report the development of an instrumentation and control system instantiated on a microprocessor-field programmable gate array (FPGA) device for a harmonic oscillator comprising a portion of a magnetic resonance force microscope. The specific advantages of the system are that it minimizes computation, increases maintainability, and reduces the technical barrier required to enter the experimental field of magnetic resonance force microscopy. Heterodyne digital control and measurement yields computational advantages. A single microprocessor-FPGA device improves system maintainability by using a single programming language. The system presented requires significantly less technical expertise to instantiate than the instrumentation of previous systems, yet integrity of performance is retained and demonstrated with experimental data.
Comparison of Traditional and Innovative Techniques to Solve Technical Challenges
NASA Technical Reports Server (NTRS)
Perchonok, Michele
2011-01-01
This slide presentation reviews the use of traditional and innovative techniques to solve technical challenges in food storage technology. The planning for a mission to Mars is underway, and the food storage technology improvements requires that improvements be made. This new technology is required, because current food storage technology is inadequate,refrigerators or freezers are not available for food preservation, and that a shelf life of 5 years is expected. A 10 year effort to improve food packaging technology has not enhanced significantly food packaging capabilities. Two innovation techniques were attempted InnoCentive and Yet2.com and have provided good results, and are still under due diligence for solver verification.
16 CFR § 1401.5 - Providing performance and technical data to purchasers by labeling.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Providing performance and technical data to...: REQUIREMENTS TO PROVIDE THE COMMISSION WITH PERFORMANCE AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL DATA § 1401.5 Providing performance and technical data to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...
47 CFR 15.517 - Technical requirements for indoor UWB systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for indoor UWB systems. 15.517 Section 15.517 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.517 Technical requirements for indoor UWB systems. (a) Operation...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
47 CFR 15.511 - Technical requirements for surveillance systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for surveillance systems... DEVICES Ultra-Wideband Operation § 15.511 Technical requirements for surveillance systems. (a) The UWB... surveillance systems operated by law enforcement, fire or emergency rescue organizations or by manufacturers...
30 CFR 7.404 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Technical requirements. 7.404 Section 7.404 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND... Cable Splice Kits § 7.404 Technical requirements. (a) Electric cables and splices shall be flame...
Review of PREPA Technical Requirements for Interconnecting Wind and Solar Generation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gevorgian, Vahan; Booth, Sarah
2013-11-01
The Puerto Rico Electric Power Authority developed the minimum technical requirements for interconnection of wind turbine generation and photovoltaic power plants. NREL has conducted a review of these requirements based on generic technical aspects and electrical characteristics of wind and photovoltaic power plants, and on existing requirements from other utilities (both U.S. and European).
Managing to harvest? Perspectives on the potential of aquaculture
Muir, James
2005-01-01
Aquaculture has been one of the most rapid and technically innovative of food production sectors globally, with significant investment, scientific and technical development and production growth in many parts of the world over the past two decades. While this has had a significant effect on the global supply of aquatic food products and had an important impact in rural and urban food supply and employment in many developing economies, growth and increasing internationalization has not been without concern for natural resource use, environmental impact and social disruption. The expectations for production and diversification are now significant and while the scientific and technical means are already available to meet much of the intended targets, practical constraints of investment, profitability, resource access and system efficiency are likely to become far more important constraints for the future. This review offers a contemporary perspective on the ways in which the sector might develop, its interactions with constraints and the strategies that may be required to ensure that future development is both positive and sustainable. PMID:15713597
47 CFR 15.513 - Technical requirements for medical imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for medical imaging systems. 15.513 Section 15.513 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.513 Technical requirements for medical imaging systems. (a) The UWB...
77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-17
...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... veterinary use by the International Cooperation on Harmonisation of Technical Requirements for Registration...
40 CFR 58.11 - Network technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...
40 CFR 58.11 - Network technical requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 5 2011-07-01 2011-07-01 false Network technical requirements. 58.11... (CONTINUED) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.11 Network technical requirements. (a)(1... A to this part when operating the SLAMS networks. (2) Beginning January 1, 2009, State and local...
47 CFR 15.510 - Technical requirements for through D-wall imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for through D-wall imaging systems. 15.510 Section 15.510 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Ultra-Wideband Operation § 15.510 Technical requirements for through D-wall imaging...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...
47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...
47 CFR 80.231 - Technical Requirements for Class B Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Identification System (AIS) equipment. 80.231 Section 80.231 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 80.231 Technical Requirements for Class B Automatic Identification System (AIS) equipment. (a) Class B Automatic Identification System (AIS) equipment must meet the technical requirements of IEC 62287...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
47 CFR 15.515 - Technical requirements for vehicular radar systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for vehicular radar... DEVICES Ultra-Wideband Operation § 15.515 Technical requirements for vehicular radar systems. (a..., changing gears, or engaging a turn signal. (b) The UWB bandwidth of a vehicular radar system operating...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false Training and technical assistance for unsuccessful... REQUIREMENTS Enforcement Procedures § 493.1838 Training and technical assistance for unsuccessful participation... may require the laboratory to undertake training of its personnel, or to obtain necessary technical...
Code of Federal Regulations, 2010 CFR
2010-04-01
... agreements and technical assistance agreements. 124.8 Section 124.8 Foreign Relations DEPARTMENT OF STATE... Clauses required both in manufacturing license agreements and technical assistance agreements. The following statements must be included both in manufacturing license agreements and in technical assistance...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2010 CFR
2010-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2012 CFR
2012-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2011 CFR
2011-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2014 CFR
2014-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
9 CFR 351.16 - Certificate required for shipments of technical animal fat.
Code of Federal Regulations, 2013 CFR
2013-01-01
... technical animal fat. 351.16 Section 351.16 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... AND VOLUNTARY INSPECTION AND CERTIFICATION CERTIFICATION OF TECHNICAL ANIMAL FATS FOR EXPORT Transportation and Exportation of Certified Technical Animal Fat § 351.16 Certificate required for shipments of...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
15 CFR 911.8 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES CONCERNING USE OF THE NOAA SPACE-BASED DATA COLLECTION SYSTEMS § 911.8 Technical requirements. (a) All platform operators of the NOAA DCS must use a data collection platform radio set whose technical...
77 FR 13506 - Modification of Significant New Uses of Tris Carbamoyl Triazine; Technical Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
... (202) 566-0280. Docket visitors are required to show photographic identification, pass through a metal detector, and sign the EPA visitor log. All visitor bags are processed through an X-ray machine and subject...
47 CFR 80.271 - Technical requirements for portable survival craft radiotelephone transceivers.
Code of Federal Regulations, 2011 CFR
2011-10-01
...:9 with no significant adverse effect upon the performance of the device; (5) The transceivers must... Commission's database. [51 FR 31213, Sept. 2, 1986, as amended at 63 FR 36607, July 7, 1998; 73 FR 4483, Jan...
TECHNICAL MANPOWER IN NEW YORK STATE. VOLUME II.
ERIC Educational Resources Information Center
AMATULLI, ANGELO; AND OTHERS
THE JOB CONTENT OF THE TECHNICAL OCCUPATIONS AND THE TECHNICAL SKILLS AND SUBJECT MATTER KNOWLEDGES REQUIRED ARE BASED PRIMARILY ON INFORMATION SUPPLIED BY EMPLOYERS FROM 17,414 ESTABLISHMENTS IN NEW YORK STATE. DATA ARE ALSO GIVEN ON GRADE STRUCTURE, EDUCATION AND EXPERIENCE REQUIREMENTS, TESTS AND LICENSES REQUIRED FOR THE JOB, SOURCES OF…
ERIC Educational Resources Information Center
Savage, Gerald J.; Seible, Marcea K.
2010-01-01
This article reports a study of internship requirements in technical communication programs compared with three established professions and one emerging profession that have certification or licensing requirements for practitioners. The study addresses three questions about technical communication internship programs: 1) Are internships offered as…
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
47 CFR 25.215 - Technical requirements for space stations in the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Technical requirements for space stations in... Technical requirements for space stations in the Direct Broadcast Satellite Service. In addition to § 25.148(f), space station antennas operating in the Direct Broadcast Satellite Service must be designed to...
38 CFR 61.52 - Threshold requirements for technical assistance grant applications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Threshold requirements for technical assistance grant applications. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.52 Threshold requirements for technical assistanc...
38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...
38 CFR 61.52 - Technical assistance grant application packages-threshold requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Technical assistance grant application packages-threshold requirements. 61.52 Section 61.52 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM Technical Assistance Grants § 61.52 Technical...
44 CFR 65.3 - Requirement to submit new technical data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... available, a community shall notify the Administrator of the changes by submitting technical or scientific... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's...
Closed-ecology life support systems /CELSS/ for long-duration, manned missions
NASA Technical Reports Server (NTRS)
Modell, M.; Spurlock, J. M.
1979-01-01
Studies were conducted to scope the principal areas of technology that can contribute to the development of closed-ecology life support systems (CELSS). Such systems may be required for future space activities, such as space stations, manufacturing facilities, or colonies. A major feature of CELSS is the regeneration of food from carbon in waste materials. Several processes, using biological and/or physico-chemical components, have been postulated for closing the recycle loop. At the present time, limits of available technical information preclude the specification of an optimum scheme. Nevertheless, the most significant technical requirements can be determined by way of an iterative procedure of formulating, evaluating and comparing various closed-system scenario. The functions features and applications of this systems engineering procedure are discussed.
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
13 CFR 306.2 - Award requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 306.2 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.2 Award requirements. EDA selects Projects for Local and National Technical Assistance Investments in...
Omondi Aduda, Dickens S; Ouma, Collins; Onyango, Rosebella; Onyango, Mathews; Bertrand, Jane
2015-01-01
Voluntary medical male circumcision (VMMC) service delivery is complex and resource-intensive. In Kenya's context there is still paucity of information on resource use vis-à-vis outputs as programs scale up. Knowledge of technical efficiency, productivity and potential sources of constraints is desirable to improve decision-making. To evaluate technical efficiency and productivity of VMMC service delivery in Nyanza in 2011/2012 using data envelopment analysis. Comparative process evaluation of facilities providing VMMC in Nyanza in 2011/2012 using output orientated data envelopment analysis. Twenty one facilities were evaluated. Only 1 of 7 variables considered (total elapsed operation time) significantly improved from 32.8 minutes (SD 8.8) in 2011 to 30 minutes (SD 6.6) in 2012 (95%CI = 0.0350-5.2488; p = 0.047). Mean scale technical efficiency significantly improved from 91% (SD 19.8) in 2011 to 99% (SD 4.0) in 2012 particularly among outreach compared to fixed service delivery facilities (CI -31.47959-4.698508; p = 0.005). Increase in mean VRS technical efficiency from 84% (SD 25.3) in 2011 and 89% (SD 25.1) in 2012 was not statistically significant. Benchmark facilities were #119 and #125 in 2011 and #103 in 2012. Malmquist Productivity Index (MPI) at fixed facilities declined by 2.5% but gained by 4.9% at outreach ones by 2012. Total factor productivity improved by 83% (p = 0.032) in 2012, largely due to progress in technological efficiency by 79% (p = 0.008). Significant improvement in scale technical efficiency among outreach facilities in 2012 was attributable to accelerated activities. However, ongoing pure technical inefficiency requires concerted attention. Technological progress was the key driver of service productivity growth in Nyanza. Incorporating service-quality dimensions and using stepwise-multiple criteria in performance evaluation enhances comprehensiveness and validity. These findings highlight site-level resource use and sources of variations in VMMC service productivity, which are important for program planning.
Leadership Matters: Addressing the Student Success and Completion Agenda
ERIC Educational Resources Information Center
McClenney, Byron N.
2013-01-01
This chapter describes a movement to significantly increase student attainment in community and technical colleges. The observations of Leadership Coaches in Achieving the Dream, developed over a nine-year period of involvement, provide insight into the leadership required to transform institutional culture.
10 CFR 960.5-2-5 - Environmental quality.
Code of Federal Regulations, 2014 CFR
2014-01-01
... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...
10 CFR 960.5-2-5 - Environmental quality.
Code of Federal Regulations, 2013 CFR
2013-01-01
... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...
10 CFR 960.5-2-5 - Environmental quality.
Code of Federal Regulations, 2012 CFR
2012-01-01
... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...
An MBSE Approach to Space Suit Development
NASA Technical Reports Server (NTRS)
Cordova, Lauren; Kovich, Christine; Sargusingh, Miriam
2012-01-01
The EVA/Space Suit Development Office (ESSD) Systems Engineering and Integration (SE&I) team has utilized MBSE in multiple programs. After developing operational and architectural models, the MBSE framework was expanded to link the requirements space to the system models through functional analysis and interfaces definitions. By documenting all the connections within the technical baseline, ESSD experienced significant efficiency improvements in analysis and identification of change impacts. One of the biggest challenges presented to the MBSE structure was a program transition and restructuring effort, which was completed successfully in 4 months culminating in the approval of a new EVA Technical Baseline. During this time three requirements sets spanning multiple DRMs were streamlined into one NASA-owned Systems Requirement Document (SRD) that successfully identified requirements relevant to the current hardware development effort while remaining extensible to support future hardware developments. A capability-based hierarchy was established to provide a more flexible framework for future space suit development that can support multiple programs with minimal rework of basic EVA/Space Suit requirements. This MBSE approach was most recently applied for generation of an EMU Demonstrator technical baseline being developed for an ISS DTO. The relatively quick turnaround of operational concepts, architecture definition, and requirements for this new suit development has allowed us to test and evolve the MBSE process and framework in an extremely different setting while still offering extensibility and traceability throughout ESSD projects. The ESSD MBSE framework continues to be evolved in order to support integration of all products associated with the SE&I engine.
ERIC Educational Resources Information Center
Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges
2015-01-01
Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…
NASA Technical Reports Server (NTRS)
Zhang. W. W.; Biskach, M. P.; Blake, P. N.; Chan, K. W.; Gaskin, J. A.; Hong, M. L.; Jones, W. D.; Kolos, L. D.; Mazzarella, J. R.; McClelland, R. S.;
2012-01-01
X-ray astronomy depends on the availability of telescopes with high resolution and large photon collecting areas. Since x-ray observation can only be carried out above the atmosphere, these telescopes must be necessarily lightweight. Compounding the lightweight requirement is that an x-ray telescope consists of many nested concentric shells, which further require that x-ray mirrors must also be geometrically thin to achieve high packing efficiency. This double lightweight and geometrically thin requirement poses significant technical challenges in fabricating the mirrors and in integrating them into mirror assemblies. This paper reports on the approach, strategy and status of our x-ray optics development program whose objective is to meet these technical challenges at modest cost to enable future x-ray missions, including small Explorer missions in the near term, probe class missions in the medium term, and large flagship missions in the long term.
Minimum Requirements for Taxicab Security Cameras.
Zeng, Shengke; Amandus, Harlan E; Amendola, Alfred A; Newbraugh, Bradley H; Cantis, Douglas M; Weaver, Darlene
2014-07-01
The homicide rate of taxicab-industry is 20 times greater than that of all workers. A NIOSH study showed that cities with taxicab-security cameras experienced significant reduction in taxicab driver homicides. Minimum technical requirements and a standard test protocol for taxicab-security cameras for effective taxicab-facial identification were determined. The study took more than 10,000 photographs of human-face charts in a simulated-taxicab with various photographic resolutions, dynamic ranges, lens-distortions, and motion-blurs in various light and cab-seat conditions. Thirteen volunteer photograph-evaluators evaluated these face photographs and voted for the minimum technical requirements for taxicab-security cameras. Five worst-case scenario photographic image quality thresholds were suggested: the resolution of XGA-format, highlight-dynamic-range of 1 EV, twilight-dynamic-range of 3.3 EV, lens-distortion of 30%, and shutter-speed of 1/30 second. These minimum requirements will help taxicab regulators and fleets to identify effective taxicab-security cameras, and help taxicab-security camera manufacturers to improve the camera facial identification capability.
Jaffré, Yannick; Suh, Siri
2016-05-01
Despite impressive global investment in reproductive health programs in West Africa, maternal mortality remains unacceptably high and obstetric care is often inadequate. Fertility is among the highest in the world, while contraceptive prevalence remains among the lowest. This paper explores the social and technical dimensions of this situation. We argue that effective reproductive health programs require analyzing the interfaces between technical programs and the social logics and behaviors of health professionals and client populations. Significant gaps between health programs' goals and the behaviors of patients and health care professionals have been observed. While public health projects aim to manage reproduction, sexuality, fertility, and professional practices are regulated socially. Such projects may target technical practices, but access to care is greatly influenced by social norms and ethics. This paper shows how an empirical anthropology that investigates the social and technical interfaces of reproduction can contribute to improved global health. Copyright © 2016 Elsevier Ltd. All rights reserved.
Practical lessons in remote connectivity.
Kouroubali, A.; Starren, J.; Barrows, R. C.; Clayton, P. D.
1997-01-01
Community Health Information Networks (CHINs) require the ability to provide computer network connections to many remote sites. During the implementation of the Washington Heights and Inwood Community Health Management Information System (WHICHIS) at the Columbia-Presbyterian Medical Center (CPMC), a number of remote connectivity issues have been encountered. Both technical and non-technical issues were significant during the installation. We developed a work-flow model for this process which may be helpful to any health care institution attempting to provide seamless remote connectivity. This model is presented and implementation lessons are discussed. PMID:9357643
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jaffan, Abdel Aziz A., E-mail: aajaffan@gmail.com; Prince, Ethan A., E-mail: eprince@lifespan.org; Hampson, Christopher O., E-mail: christopherohampson@gmail.com
2013-06-15
Purpose. To establish the efficacy and safety of the preclose technique in total percutaneous endovascular aortic repair (PEVAR).MethodsA systematic literature search of Medline database was conducted for series on PEVAR published between January 1999 and January 2012.ResultsThirty-six articles comprising 2,257 patients and 3,606 arterial accesses were included. Anatomical criteria used to exclude patients from undergoing PEVAR were not uniform across all series. The technical success rate was 94 % per arterial access. Failure was unilateral in the majority (93 %) of the 133 failed PEVAR cases. The groin complication rate in PEVAR was 3.6 %; a minority (1.6 %) ofmore » these groin complications required open surgery. The groin complication rate in failed PEVAR cases converted to groin cutdown was 6.1 %. A significantly higher technical success rate was achieved when arterial access was performed via ultrasound guidance. Technical failure rate was significantly higher with larger sheath size ({>=}20F). Conclusion. The preclose technique in PEVAR has a high technical success rate and a low groin complication rate. Technical success tends to increase with ultrasound-guided arterial access and decrease with larger access. When failure occurs, it is unilateral in the majority of cases, and conversion to surgical cutdown does not appear to increase the operative risk.« less
47 CFR 68.604 - Requirements for submitting technical criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Requirements for submitting technical criteria. 68.604 Section 68.604 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER...) may establish technical criteria for terminal equipment pursuant to ANSI consensus decision-making...
7 CFR 652.21 - Certification criteria and requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must: (1) Have the required technical training, education, and experience to perform the level of technical assistance for which certification is sought; (2) Meet any applicable professional or business... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL SERVICE PROVIDER ASSISTANCE...
Louridas, Marisa; Quinn, Lauren E; Grantcharov, Teodor P
2016-03-01
Emerging evidence suggests that despite dedicated practice, not all surgical trainees have the ability to reach technical competency in minimally invasive techniques. While selecting residents that have the ability to reach technical competence is important, evidence to guide the incorporation of technical ability into selection processes is limited. Therefore, the purpose of the present study was to evaluate whether background experiences and 2D-3D visual spatial test results are predictive of baseline laparoscopic skill for the novice surgical trainee. First-year residents were studied. Demographic data and background surgical and non-surgical experiences were obtained using a questionnaire. Visual spatial ability was evaluated using the PicSOr, cube comparison (CC) and card rotation (CR) tests. Technical skill was assessed using the camera navigation (LCN) task and laparoscopic circle cut (LCC) task. Resident performance on these technical tasks was compared and correlated with the questionnaire and visual spatial findings. Previous experience in observing laparoscopic procedures was associated with significantly better LCN performance, and experience in navigating the laparoscopic camera was associated with significantly better LCC task results. Residents who scored higher on the CC test demonstrated a more accurate LCN path length score (r s(PL) = -0.36, p = 0.03) and angle path (r s(AP) = -0.426, p = 0.01) score when completing the LCN task. No other significant correlations were found between the visual spatial tests (PicSOr, CC or CR) and LCC performance. While identifying selection tests for incoming surgical trainees that predict technical skill performance is appealing, the surrogate markers evaluated correlate with specific metrics of surgical performance related to a single task but do not appear to reliably predict technical performance of different laparoscopic tasks. Predicting the acquisition of technical skills will require the development of a series of evidence-based tests that measure a number of innate abilities as well as their inherent interactions.
48 CFR 209.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Non-disclosure requirements for contractors accessing third party proprietary technical data or... may be required to enter into non-disclosure agreements directly with the third party asserting restrictions on limited rights technical data, commercial technical data, or restricted rights computer...
The French Space Operation Act: Technical Regulations
NASA Astrophysics Data System (ADS)
Trinchero, J. P.; Lazare, B.
2010-09-01
The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.
Lean Manufacturing and the Infantry: Retaining Quality during Total Mobilization
United States last decisive war against a peer threat, World War II, required significant manpower resources. Prioritizing quality manpower ...distribution to technical jobs resulted in the degradation of the infantry, which then required the Army to implement corrective measures to reverse the...deficiency in quality. Should another decisive war occur in the future, the lethality and speed of modern warfare will increase the demand for manpower , which
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 2 2014-07-01 2014-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 2 2013-07-01 2013-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 2 2011-07-01 2011-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
32 CFR 203.17 - Technical assistance provider reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 2 2012-07-01 2012-07-01 false Technical assistance provider reporting requirements. 203.17 Section 203.17 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY... technical assistance provider shall submit progress reports, financial status reports, materials prepared...
Ho, Bella; Ho, Eric
2012-01-01
Introduction: ISO 15189 was a new standard published in 2003 for accrediting medical laboratories. We believe that some requirements of the ISO 15189 standard are especially difficult to meet for majority of laboratories. The aim of this article was to present the frequency of nonconformities to requirements of the ISO 15189 accreditation standard, encountered during the assessments of medical laboratories in Hong Kong, during 2004 to 2009. Materials and methods: Nonconformities reported in assessments based on ISO 15189 were analyzed in two periods – from 2004 to 2006 and in 2009. They are categorized according to the ISO 15189 clause numbers. The performance of 27 laboratories initially assessed between 2004 and 2006 was compared to their performance in the second reassessment in 2009. Results: For management requirements, nonconformities were most frequently reported against quality management system, quality and technical records and document control; whereas for technical requirements, they were reported against examination procedures, equipment, and assuring quality of examination procedures. There was no major difference in types of common nonconformities reported in the two study periods. The total number of nonconformities reported in the second reassessment of 27 laboratories in 2009 was almost halved compared to their initial assessments. The number of significant nonconformities per laboratory significantly decreased (P = 0.023). Conclusion: Similar nonconformities were reported in the two study periods though the frequency encountered decreased. The significant decrease in number of significant nonconformities encountered in the same group of laboratories in the two periods substantiated that ISO15189 contributed to quality improvement of accredited laboratories. PMID:22838190
Ho, Bella; Ho, Eric
2012-01-01
ISO 15189 was a new standard published in 2003 for accrediting medical laboratories. We believe that some requirements of the ISO 15189 standard are especially difficult to meet for majority of laboratories. The aim of this article was to present the frequency of nonconformities to requirements of the ISO 15189 accreditation standard, encountered during the assessments of medical laboratories in Hong Kong, during 2004 to 2009. Nonconformities reported in assessments based on ISO 15189 were analyzed in two periods - from 2004 to 2006 and in 2009. They are categorized according to the ISO 15189 clause numbers. The performance of 27 laboratories initially assessed between 2004 and 2006 was compared to their performance in the second reassessment in 2009. For management requirements, nonconformities were most frequently reported against quality management system, quality and technical records and document control; whereas for technical requirements, they were reported against examination procedures, equipment, and assuring quality of examination procedures. There was no major difference in types of common nonconformities reported in the two study periods. The total number of nonconformities reported in the second reassessment of 27 laboratories in 2009 was almost halved compared to their initial assessments. The number of significant nonconformities per laboratory significantly decreased (P = 0.023). Similar nonconformities were reported in the two study periods though the frequency encountered decreased. The significant decrease in number of significant nonconformities encountered in the same group of laboratories in the two periods substantiated that 15015189 contributed to quality improvement of accredited laboratories.
Raison, Nicholas; Ahmed, Kamran; Abe, Takashige; Brunckhorst, Oliver; Novara, Giacomo; Buffi, Nicolò; McIlhenny, Craig; van der Poel, Henk; van Hemelrijck, Mieke; Gavazzi, Andrea; Dasgupta, Prokar
2018-05-07
To investigate the effectiveness of motor imagery (MI) for technical skill and non-technical skill (NTS) training in minimally invasive surgery (MIS). A single-blind, parallel-group randomised controlled trial was conducted at the Vattikuti Institute of Robotic Surgery, King's College London. Novice surgeons were recruited by open invitation in 2015. After basic robotic skills training, participants underwent simple randomisation to either MI training or standard training. All participants completed a robotic urethrovesical anastomosis task within a simulated operating room. In addition to the technical task, participants were required to manage three scripted NTS scenarios. Assessment was performed by five blinded expert surgeons and a NTS expert using validated tools for evaluating technical skills [Global Evaluative Assessment of Robotic Skills (GEARS)] and NTS [Non-Technical Skills for Surgeons (NOTSS)]. Quality of MI was assessed using a revised Movement Imagery Questionnaire (MIQ). In all, 33 participants underwent MI training and 29 underwent standard training. Interrater reliability was high, Krippendorff's α = 0.85. After MI training, the mean (sd) GEARS score was significantly higher than after standard training, at 13.1 (3.25) vs 11.4 (2.97) (P = 0.03). There was no difference in mean NOTSS scores, at 25.8 vs 26.4 (P = 0.77). MI training was successful with significantly higher imagery scores than standard training (mean MIQ score 5.1 vs 4.5, P = 0.04). Motor imagery is an effective training tool for improving technical skill in MIS even in novice participants. No beneficial effect for NTS was found. © 2018 The Authors BJU International © 2018 BJU International Published by John Wiley & Sons Ltd.
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-0288] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal... been developed for veterinary use by the International Cooperation on Harmonisation of Technical...
Repeated Kicking Actions in Karate: Effect on Technical Execution in Elite Practitioners.
Quinzi, Federico; Camomilla, Valentina; Di Mario, Alberto; Felici, Francesco; Sbriccoli, Paola
2016-04-01
Training in martial arts is commonly performed by repeating a technical action continuously for a given number of times. This study aimed to investigate if the repetition of the task alters the proper technical execution, limiting the training efficacy for the technical evaluation during competition. This aim was pursued analyzing lower-limb kinematics and muscle activation during repeated roundhouse kicks. Six junior karate practitioners performed continuously 20 repetitions of the kick. Hip and knee kinematics and sEMG of vastus lateralis, biceps (BF), and rectus femoris were recorded. For each repetition, hip abduction-adduction and flexion-extension and knee flexion-extension peak angular displacements and velocities, agonist and antagonist muscle activation were computed. Moreover, to monitor for the presence of myoelectric fatigue, if any, the median frequency of the sEMG was computed. All variables were normalized with respect to their individual maximum observed during the sequence of kicks. Linear regressions were fitted to each normalized parameter to test its relationship with the repetition number. Linear-regression analysis showed that, during the sequence, the athletes modified their technique: Knee flexion, BF median frequency, hip abduction, knee-extension angular velocity, and BF antagonist activation significantly decreased. Conversely, hip flexion increased significantly. Since karate combat competitions require proper technical execution, training protocols combining severe fatigue and technical actions should be carefully proposed because of technique adaptations. Moreover, trainers and karate masters should consider including specific strength exercises for the BF and more generally for knee flexors.
INDOT Technical Training Plan : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
A wide range of job classifications, increasing technical : performance expectations, licensing and certification requirements, : budget restrictions and frequent department : reorganization has made technical training of employees : more difficult, ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...
44 CFR 65.3 - Requirement to submit new technical data.
Code of Federal Regulations, 2010 CFR
2010-10-01
... technical data. 65.3 Section 65.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.3 Requirement to submit new technical data. A community's base flood elevations may increase or decrease resulting from physical changes affecting flooding...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2011 CFR
2011-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2012 CFR
2012-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2014 CFR
2014-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2010 CFR
2010-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers by design...
19 CFR 115.30 - Technical requirements for containers by design type.
Code of Federal Regulations, 2013 CFR
2013-04-01
... SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS Procedures for Approval of Containers by Design Type § 115.30 Technical... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers by design...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2013 CFR
2013-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
22 CFR 125.6 - Certification requirements for exemptions.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... Certifications consist of clearly marking the package or letter containing the technical data “22 CFR [insert... LICENSES FOR THE EXPORT OF TECHNICAL DATA AND CLASSIFIED DEFENSE ARTICLES § 125.6 Certification requirements for exemptions. (a) To claim an exemption for the export of technical data under the provisions of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... Information Collection for Public Comment; McKinney-Vento Technical Assistance Narrative, Matrices, and... Narrative, Matrices, and Reporting Requirements. Description of the need for the information proposed: McKinney- Vento Technical Assistance (MV-TA) Narrative, Matrices, and Reporting Requirements will allow the...
Iguchi, Toshihiro; Hiraki, Takao; Matsui, Yusuke; Fujiwara, Hiroyasu; Masaoka, Yoshihisa; Tanaka, Takashi; Sato, Takuya; Gobara, Hideo; Toyooka, Shinichi; Kanazawa, Susumu
2018-05-01
To retrospectively evaluate the technical success of computed tomography fluoroscopy-guided short hookwire placement before video-assisted thoracoscopic surgery and to identify the risk factors for initial placement failure. In total, 401 short hookwire placements for 401 lesions (mean diameter 9.3 mm) were reviewed. Technical success was defined as correct positioning of the hookwire. Possible risk factors for initial placement failure (i.e., requirement for placement of an additional hookwire or to abort the attempt) were evaluated using logistic regression analysis for all procedures, and for procedures performed via the conventional route separately. Of the 401 initial placements, 383 were successful and 18 failed. Short hookwires were finally placed for 399 of 401 lesions (99.5%). Univariate logistic regression analyses revealed that in all 401 procedures only the transfissural approach was a significant independent predictor of initial placement failure (odds ratio, OR, 15.326; 95% confidence interval, CI, 5.429-43.267; p < 0.001) and for the 374 procedures performed via the conventional route only lesion size was a significant independent predictor of failure (OR 0.793, 95% CI 0.631-0.996; p = 0.046). The technical success of preoperative short hookwire placement was extremely high. The transfissural approach was a predictor initial placement failure for all procedures and small lesion size was a predictor of initial placement failure for procedures performed via the conventional route. • Technical success of preoperative short hookwire placement was extremely high. • The transfissural approach was a significant independent predictor of initial placement failure for all procedures. • Small lesion size was a significant independent predictor of initial placement failure for procedures performed via the conventional route.
Civilian Radioactive Waste Management System Requirements Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
C.A. Kouts
2006-05-10
The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less
NASA Astrophysics Data System (ADS)
Dingwall, B. J.
2015-12-01
NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that were necessary for success. A student survey was conducted to assess the impact of USIP. Over 90% of students reported a significant improvement in their technical and project management skills. Perhaps more importantly, 88% of students reported that they have a far better appreciation for the value of multi-disciplinary teams.
75 FR 16670 - 1-Propene, 2,3,3,3-tetrafluoro-; Withdrawal of Significant New Use Rule
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... of Pollution Prevention and Toxics, Environmental Protection Agency, 1200 Pennsylvania Ave., NW... technical information contact: Karen Chu, Chemical Control Division (7405M), Office of Pollution Prevention... recordkeeping requirements. Dated: March 25, 2010. Barbara A. Cunningham, Acting Director, Office of Pollution...
10 CFR 50.36 - Technical specifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or component that is part of the primary success path and which functions or actuates to mitigate a... significant safety functions. Where a limiting safety system setting is specified for a variable on which a... the automatic safety system does not function as required, the licensee shall take appropriate action...
CERA; Refiners can cope with CAA requirements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-17
This paper reports on a study conducted for the Department of Energy which predicts initial reformulated gasoline requirements in 1995 won't pose significant technical problems for U.S. refiners. But nearly all refiners will have to make added investments. Cambridge Energy Research Associates (CERA) prepared the study for DOE on critical issues affecting refiners and U.S. product supplies in the 1990s, particularly the effects of the 1990 Clean Air Act (CAA) amendments.
Future NTP Development Synergy Leveraged from Current J-2X Engine Development
NASA Astrophysics Data System (ADS)
Ballard, Richard O.
2008-01-01
This paper is a discussion of how the many long-lead development elements required for the realization of a future nuclear thermal propulsion (NTP) system can be effectively leveraged from the ongoing work being conducted on the J-2X engine program for the Constellation Program. Development studies conducted to date for NTP forward planning have identified a number of technical areas that will require advancement to acceptable technology readiness levels (TRLs) before they can be utilized in NTP system development. These include high-temperature, high-area ratio nozzle extension; long-life, low-NPSP turbomachinery; and low-boiloff propellant management, and a qualified nuclear fuel element. The current J-2X program is working many of these areas that can be leveraged to support NTP development in a highly compatible and synergistic fashion. In addition to supporting technical development, there are other programmatic issues being worked in the J-2X program that can be leveraged by a future NTP development program. These include compliance with recently-evolved space system requirements such as human-rating, fault tolerance and fracture control. These and other similar mandatory system requirements have been adopted by NASA and can result in a significant technical impact beyond elevation of the root technologies required by NTP. Finally, the exploitation of experience, methodologies, and procedures developed by the J-2X program in the areas of verification, qualification, certification, altitude simulation testing, and facility definition will be especially applicable to a future NTP system. The similarities in system mission (in-space propulsion) and operational environment (vacuum, zero-gee) between J-2X and NTP make this highly synergistic. Thus, it can be shown that the collective benefit of leveraging experience and technologies developed during the J-2X program can result in significant savings in development cost and schedule for NTP.
Future NTP Development Synergy Leveraged from Current J-2X Engine Development
NASA Technical Reports Server (NTRS)
Ballard, Richard O.
2008-01-01
This paper is a discussion of how the many long-lead development elements required for the realization of a future nuclear thermal propulsion (NTP) system can be effectively leveraged from the ongoing work being conducted on the J-2X engine program for the Constellation Program. Development studies conducted to date for NTP forward planning have identified a number of technical areas that will require advancement to acceptable technology readiness levels (TRLs) before they can be utilized in NTP system development. These include high-temperature, high-area ratio nozzle extension; long-life, low-NPSP. turbomachinery; and low-boiloff propellant management; and a qualified nuclear fuel element. The current J-2X program is working many of these areas that can be leveraged to support NTP development in a highly compatible and synergistic fashion. In addition to supporting technical development, there are other programmatic issues being worked in the J-2X program that can be leveraged by a future NTP development program. These include compliance with recently-evolved space system requirements such as human-rating, fault tolerance and fracture control. These and other similar mandatory system requirements have been adopted by NASA and can result in a significant technical impact beyond elevation of the root technologies required by NTP. Finally, the exploitation of experience, methodologies, and procedures developed by the J-2X program in the areas of verification, qualification, certification, altitude simulation testing, and facility definition will be especially applicable to a future NTP system. The similarities in system mission (in-space propulsion) and operational environment (vacuum, zero-gee) between J-2X and NTP make this highly synergistic. Thus, it can be $hown that the collective benefit of leveraging experience and technologies developed during the J-2X program can result in significant savings in development cost and schedule for NTP.
Technical Excellence: A Requirement for Good Engineering
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.
2008-01-01
Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.
Díaz, Carlos Eduardo; Fernández, Roemi; Armada, Manuel; García, Felipe
2017-12-01
Nowadays robots play an important role in society, mainly due to the significant benefits they provide when utilized for assisting human beings in the execution of dangerous or repetitive tasks. Medicine is one of the fields in which robots are gaining greater use and development, especially those employed in minimally invasive surgery (MIS). However, due to the particular conditions of the human body where robots have to act, the design of these systems is complex, not only from a technical point of view, but also because the clinical needs and the normativity aspects are important considerations that have to be taken into account in order to achieve better performances and more secure systems for patients and surgeons. Thus, this paper explores the clinical needs and the technical requirements that will trace the roadmap for the next scientific and technological advances in the field of robotic surgery, the metrics that should be defined for safe technology development and the standards that are being elaborated for boosting the industry and facilitating systems integration. Copyright © 2017 John Wiley & Sons, Ltd.
Technical Feasibility Assessment of Lunar Base Mission Scenarios
NASA Astrophysics Data System (ADS)
Magelssen, Trygve ``Spike''; Sadeh, Eligar
2005-02-01
Investigation of the literature pertaining to lunar base (LB) missions and the technologies required for LB development has revealed an information gap that hinders technical feasibility assessment. This information gap is the absence of technical readiness levels (TRL) (Mankins, 1995) and information pertaining to the criticality of the critical enabling technologies (CETs) that enable mission success. TRL is a means of identifying technical readiness stages of a technology. Criticality is defined as the level of influence the CET has on the mission scenario. The hypothesis of this research study is that technical feasibility is a function of technical readiness and technical readiness is a function of criticality. A newly developed research analysis method is used to identify the technical feasibility of LB mission scenarios. A Delphi is used to ascertain technical readiness levels and CET criticality-to-mission. The research analysis method is applied to the Delphi results to determine the technical feasibility of the LB mission scenarios that include: observatory, science research, lunar settlement, space exploration gateway, space resource utilization, and space tourism. The CETs identified encompasses four major system level technologies of: transportation, life support, structures, and power systems. Results of the technical feasibility assessment show the observatory and science research LB mission scenarios to be more technical ready out of all the scenarios, but all mission scenarios are in very close proximity to each other in regard to criticality and TRL and no one mission scenario stands out as being absolutely more technically ready than any of the other scenarios. What is significant and of value are the Delphi results concerning CET criticality-to-mission and the TRL values evidenced in the Tables that can be used by anyone assessing the technical feasibility of LB missions.
20 CFR 411.180 - What is timely progress toward self-supporting employment?
Code of Federal Regulations, 2010 CFR
2010-04-01
... certificate or vocational or technical training that will enhance your ability to return to work. In addition...-secondary education requirement or vocational or technical training requirement in the applicable progress... this 12-month period; or (iv) You must have been enrolled in a vocational or technical training program...
15 CFR 14.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., record of past performance, financial and technical resources or accessibility to other necessary... practicable, of technical requirements in terms of functions to be performed or performance required...
Monitored Geologic Repository Project Description Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. M. Curry
2001-01-30
The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing formore » the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).« less
Does Satisfaction Reflect the Technical Quality of Mental Health Care?
Edlund, Mark J; Young, Alexander S; Kung, Fuan Yue; Sherbourne, Cathy D; Wells, Kenneth B
2003-01-01
Objective To analyze the relationship between satisfaction and technical quality of care for common mental disorders. Data Source A nationally representative telephone survey of 9,585 individuals conducted in 1997–1998. Study Design Using multinomial logistic regression techniques we investigated the association between a five-level measure of satisfaction with the mental health care available for personal or emotional problems and two quality indicators. The first measure, appropriate technical quality, was defined as use of either appropriate counseling or psychotropic medications during the prior year for a probable depressive or anxiety disorder. The second, active treatment, indicated whether the respondent had received treatment for a psychiatric disorder in the past year. Covariates included measures of physical and mental health and sociodemographic indicators. Principal Findings Appropriate technical quality of care was significantly associated with higher levels of satisfaction. The strength of the association was moderate. Conclusions Satisfaction is associated with technical quality of care. However, profiling quality of care with satisfaction will likely require large samples and case-mix adjustment, which may be more difficult for plans or provider groups to implement than measuring technical indicators. More importantly, satisfaction is not the same as technical quality, and our results suggest that at this time they cannot be made to approach each other closely enough to eliminate either. PMID:12785565
Omondi Aduda, Dickens S.; Ouma, Collins; Onyango, Rosebella; Onyango, Mathews; Bertrand, Jane
2015-01-01
Background Voluntary medical male circumcision (VMMC) service delivery is complex and resource-intensive. In Kenya’s context there is still paucity of information on resource use vis-à-vis outputs as programs scale up. Knowledge of technical efficiency, productivity and potential sources of constraints is desirable to improve decision-making. Objective To evaluate technical efficiency and productivity of VMMC service delivery in Nyanza in 2011/2012 using data envelopment analysis. Design Comparative process evaluation of facilities providing VMMC in Nyanza in 2011/2012 using output orientated data envelopment analysis. Results Twenty one facilities were evaluated. Only 1 of 7 variables considered (total elapsed operation time) significantly improved from 32.8 minutes (SD 8.8) in 2011 to 30 minutes (SD 6.6) in 2012 (95%CI = 0.0350–5.2488; p = 0.047). Mean scale technical efficiency significantly improved from 91% (SD 19.8) in 2011 to 99% (SD 4.0) in 2012 particularly among outreach compared to fixed service delivery facilities (CI -31.47959–4.698508; p = 0.005). Increase in mean VRS technical efficiency from 84% (SD 25.3) in 2011 and 89% (SD 25.1) in 2012 was not statistically significant. Benchmark facilities were #119 and #125 in 2011 and #103 in 2012. Malmquist Productivity Index (MPI) at fixed facilities declined by 2.5% but gained by 4.9% at outreach ones by 2012. Total factor productivity improved by 83% (p = 0.032) in 2012, largely due to progress in technological efficiency by 79% (p = 0.008). Conclusions Significant improvement in scale technical efficiency among outreach facilities in 2012 was attributable to accelerated activities. However, ongoing pure technical inefficiency requires concerted attention. Technological progress was the key driver of service productivity growth in Nyanza. Incorporating service-quality dimensions and using stepwise-multiple criteria in performance evaluation enhances comprehensiveness and validity. These findings highlight site-level resource use and sources of variations in VMMC service productivity, which are important for program planning. PMID:25706119
Fly-by-light flight control system technology development plan
NASA Technical Reports Server (NTRS)
Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.
1990-01-01
The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.
Minimum Requirements for Taxicab Security Cameras*
Zeng, Shengke; Amandus, Harlan E.; Amendola, Alfred A.; Newbraugh, Bradley H.; Cantis, Douglas M.; Weaver, Darlene
2015-01-01
Problem The homicide rate of taxicab-industry is 20 times greater than that of all workers. A NIOSH study showed that cities with taxicab-security cameras experienced significant reduction in taxicab driver homicides. Methods Minimum technical requirements and a standard test protocol for taxicab-security cameras for effective taxicab-facial identification were determined. The study took more than 10,000 photographs of human-face charts in a simulated-taxicab with various photographic resolutions, dynamic ranges, lens-distortions, and motion-blurs in various light and cab-seat conditions. Thirteen volunteer photograph-evaluators evaluated these face photographs and voted for the minimum technical requirements for taxicab-security cameras. Results Five worst-case scenario photographic image quality thresholds were suggested: the resolution of XGA-format, highlight-dynamic-range of 1 EV, twilight-dynamic-range of 3.3 EV, lens-distortion of 30%, and shutter-speed of 1/30 second. Practical Applications These minimum requirements will help taxicab regulators and fleets to identify effective taxicab-security cameras, and help taxicab-security camera manufacturers to improve the camera facial identification capability. PMID:26823992
ASC FY17 Implementation Plan, Rev. 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamilton, P. G.
The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computationalmore » resources that support annual stockpile assessment and certification, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions.« less
1975-12-01
139 APPENDIX A* BASIC CONCEPT OF MILITARY TECHNICAL CONTROL.142 6 APIENDIX Es TEST EQUIPMENI REQUIRED FOR lEASURF.4ENr OF 1AF’AMETE RS...Control ( SATEC ) Automatic Facilities heport Army Automated Quality Monitoring Reporting System (AQMPS) Army Autcmated Technical Control-Semi (ATC-Semi...technical control then beco.. es equipment status monitoring. All the major equipment in a system wculd have internal sensors with properly selected parameters
Park, Jung-Hoon; Kim, Pyeong Hwa; Shin, Ji Hoon; Tsauo, Jiaywei; Kim, Min Tae; Cho, Young Chul; Kim, Jin Hyoung; Song, Ho-Young
2016-11-01
The purpose of the study was to retrospectively evaluate the technical outcomes of removal of retrievable self-expandable metallic stents (REMSs) and identify predictors of technical failure in 81 patients with benign and malignant tracheobronchial strictures. A total of 98 REMSs were removed under fluoroscopic guidance in 81 patients with benign (n = 48) or malignant (n = 33) tracheobronchial strictures. Primary and secondary technical success rates and complication rate were evaluated. Technical outcomes with regard to underlying diseases were also evaluated. Logistic regression models were constructed to identify predictors of primary technical success. Primary and secondary technical success rates were 86.7 and 94.9 %, respectively. Stent removal-related complication rate was 7.1 % (7/98) and all were bleeding after stent removal. All bleeding complications were minor and managed conservatively. Primary technical success rate for benign strictures was significantly lower compared with that for malignant strictures (80.9 vs. 97.1 %, P = 0.029), but secondary technical success rate (93.7 vs. 97.1 %, P = 0.652) did not differ between the two groups. Granulation tissue formation was identified as an independent predictor of primary technical success (odds ratio 0.249, 95 % CI 0.071-0.874, P = 0.030). Removal of REMSs in patients with benign and malignant tracheobronchial strictures is safe and technically feasible. Bronchoscopic guidance may be required when the removal using a hook wire fails. The presence of granulation tissue was the negative predictor of primary technical success.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giaddui, T; Chen, W; Yu, J
2014-06-15
Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRTmore » to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT guidelines are updated, with the corresponding credentialing requirements. An IGRT encyclopedia describing site-specific implementation issues is currently in development.« less
45 CFR 2543.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., record of past performance, financial and technical resources or accessibility to other necessary... technical requirements in terms of functions to be performed or performance required, including the range of...
36 CFR 1210.44 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., record of past performance, financial and technical resources or accessibility to other necessary... technical requirements in terms of functions to be performed or performance required, including the range of...
14 CFR 1260.144 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., record of past performance, financial and technical resources or accessibility to other necessary... technical requirements in terms of functions to be performed or performance required, including the range of...
Functions and requirements document for interim store solidified high-level and transuranic waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith-Fewell, M.A., Westinghouse Hanford
1996-05-17
The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less
Range Flight Safety Requirements
NASA Technical Reports Server (NTRS)
Loftin, Charles E.; Hudson, Sandra M.
2018-01-01
The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.
Defining Requirements and Related Methods for Designing Sensorized Garments.
Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo
2016-05-26
Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user's age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors-also influencing user comfort-are elasticity and washability, while more technical properties are the stability of the chemical agents' effects for preserving the sensors' efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability.
Brown, Michael; Shaw, Dominick; Sharples, Sarah; Jeune, Ivan Le; Blakey, John
2015-01-01
Objectives The skill set required for junior doctors to work efficiently and safely Out of Hours (OoH) in hospitals has not been established. This is despite the OoH period representing 75% of the year and it being the time of highest mortality. We set out to explore the expectations of medical students and experiences of junior doctors of the non-technical skills needed to work OoH. Design Survey-based cross-sectional study informed by focus groups. Setting Online survey with participants from five large teaching hospitals across the UK. Participants 300 Medical Students and Doctors Outcome measure Participants ranked the importance of non-technical skills, as identified by literature review and focus groups, needed for OoH care. Results The focus groups revealed a total of eight non-technical skills deemed to be important. In the survey ‘Task Prioritisation’ (mean rank 1.617) was consistently identified as the most important non-technical skill. Stage of training affected the ranking of skills, with significant differences for ‘Communication with Senior Doctors’, ‘Dealing with Clinical Isolation’, ‘Task Prioritisation’ and ‘Communication with Patients’. Importantly, there was a significant discrepancy between the medical student expectations and experiences of doctors undertaking work. Conclusions Our findings suggest that medical staff particularly value task prioritisation skills; however, these are not routinely taught in medical schools. The discrepancy between expectations of students and experience of doctors reinforces the idea that there is a gap in training. Doctors of different grades place different importance on specific non-technical skills with implications for postgraduate training. There is a pressing need for medical schools and deaneries to review non-technical training to include more than communication skills. PMID:25687899
Overcoming Resistance to New Ideas
ERIC Educational Resources Information Center
Powell, William; Kusuma-Powell, Ochan
2015-01-01
There are two types of challenges that adults face in their professional learning: technical and adaptive. Technical challenges simply require informational learning while adaptive challenges require transformational learning, which requires us to rethink our deeply held values, beliefs, assumptions, and even our professional identity. Adaptive…
Aquifer thermal energy storage program
NASA Technical Reports Server (NTRS)
Fox, K.
1980-01-01
The purpose of the Aquifer Thermal Energy Storage Demonstration Program is to stimulate the interest of industry by demonstrating the feasibility of using a geological formation for seasonal thermal energy storage, thereby, reducing crude oil consumption, minimizing thermal pollution, and significantly reducing utility capital investments required to account for peak power requirements. This purpose will be served if several diverse projects can be operated which will demonstrate the technical, economic, environmental, and institutional feasibility of aquifer thermal energy storage systems.
EPA's 1988 regulations concerning USTs are contained in 40 CFR Part 280, 40 CFR Part 281 and 40 CFR Parts 282.50-282.105 and divided into three sections: technical requirements, financial responsibility requirements, and state program approval objectives.
47 CFR 22.353 - Blanketing interference.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...
47 CFR 22.353 - Blanketing interference.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...
47 CFR 22.353 - Blanketing interference.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...
47 CFR 22.353 - Blanketing interference.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Operational and Technical Requirements Technical Requirements § 22.353 Blanketing interference. Licensees of... consumer antenna systems, or the use of high gain antennas or antenna booster amplifiers by consumers. (d...
2012-01-01
Brief analysis of the legal framework in recent years, both in the sphere of technical regulation, and in the field of sanitary and epidemiological welfare of the population is presented in this article. The necessity of inclusion in the technical regulations for the safety of railway rolling stock and elements of railway infrastructure the requirements for sanitary-epidemiological safety and hygiene regulations has been proved. Fragments of technical regulations for railway equipment and infrastructure elements, including the basic requirements for the sanitary-epidemiological security are presented. The position of authors in the processing of the regulatory framework in the field of sanitary-epidemiological welfare of population in standardization documents in accordance with the requirements of federal law "On technical regulation" has been reflected.
ERIC Educational Resources Information Center
Dew, Stephen H.
This self-paced library workbook is a course requirement of all "technical writing" freshman English classes at the University of Arkansas. The technical writing course is required of all engineering students, and its major focus is on writing a term paper containing a bibliography produced through library research. The workbook…
48 CFR 3419.870 - Acquisition of technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... competition to submit written technical proposals. Otherwise, ED holds oral discussions with the participating... participating in a limited technical competition based on the written technical proposals or oral discussions... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Acquisition of technical...
An eCommerce Development Case: Your Company's eCommerce Web Site
ERIC Educational Resources Information Center
Ballenger, Robert M.
2007-01-01
This case provides a real-world semester long project-oriented case study for students enrolled in an electronic commerce course that has a significant development component. The case provides the technical framework in the form of functional requirements for students to design and build a fully functional transaction processing e-commerce Web…
Explaining Differing Perceptions of Employees' Skill Needs: The Case of Garment Workers in Ethiopia
ERIC Educational Resources Information Center
Yamada, Shoko; Otchia, Christian S.; Taniguchi, Kyoko
2018-01-01
The Ethiopian economy has grown significantly and the government has prioritized industrial skills development and expanded technical and vocational education and training (TVET). However, mismatches between the skills available and the skills required are widespread and the unemployment rate for TVET graduates is high. Little scholarly effort has…
40 CFR 1068.120 - What requirements must I follow to rebuild engines?
Code of Federal Regulations, 2012 CFR
2012-07-01
... systems for fuel metering or electronic control so that it significantly increases the service life of the... must have a reasonable technical basis for knowing that the rebuilt engine's emission control system... believe that the engine with those parts will control emissions of all pollutants at least to the same...
40 CFR 1068.120 - What requirements must I follow to rebuild engines?
Code of Federal Regulations, 2014 CFR
2014-07-01
... systems for fuel metering or electronic control so that it significantly increases the service life of the... must have a reasonable technical basis for knowing that the rebuilt engine's emission control system... believe that the engine with those parts will control emissions of all pollutants at least to the same...
40 CFR 1068.120 - What requirements must I follow to rebuild engines?
Code of Federal Regulations, 2013 CFR
2013-07-01
... systems for fuel metering or electronic control so that it significantly increases the service life of the... must have a reasonable technical basis for knowing that the rebuilt engine's emission control system... believe that the engine with those parts will control emissions of all pollutants at least to the same...
Rapid Fuel Quality Surveillance Through Chemometric Modeling of Near-Infrared Spectra
2009-01-01
measurements also have a first order advantage and are not time-dependent as is the case for chromatography. Thus, the data preprocessing requirements, while...due in part to the nature of hydrocarbon fuels, which imposes significant technical challenges that must be overcome, and in many cases , traditional...properties. The statistical significance of some other fuel properties is given in Table 2. Note also that in those cases where the property models
Technical skills requirement of Indonesian construction labors to work in Malaysia
NASA Astrophysics Data System (ADS)
Adi, Henny Pratiwi
2017-03-01
Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.
DOT National Transportation Integrated Search
1975-08-01
This report outlines the engineering requirements for an Airborne Laser Remote Sensor for Oil Detection and Classification System. Detailed engineering requirements are given for the major units of the system. Technical considerations pertinent to a ...
7 CFR 653.3 - Adaptation of technical standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 6 2012-01-01 2012-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...
7 CFR 653.3 - Adaptation of technical standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 6 2014-01-01 2014-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...
7 CFR 653.3 - Adaptation of technical standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 6 2011-01-01 2011-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...
7 CFR 653.3 - Adaptation of technical standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 6 2013-01-01 2013-01-01 false Adaptation of technical standards. 653.3 Section 653.3..., DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES TECHNICAL STANDARDS § 653.3 Adaptation of technical standards. Technical standards and criteria developed on a national basis may require special adaptation to meet local...
47 CFR 18.207 - Technical report.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...
47 CFR 18.207 - Technical report.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...
47 CFR 18.207 - Technical report.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical report. 18.207 Section 18.207... Applications and Authorizations § 18.207 Technical report. When required by the Commission a technical report...(s) under which the equipment is or will be marketed. (e) A statement of the rated technical...
The role of non-technical skills in surgery
Agha, Riaz A.; Fowler, Alexander J.; Sevdalis, Nick
2015-01-01
Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care. PMID:26904193
Aliakbari, Fatemeh; Bahrami, Masoud; Aein, Fereshteh; Khankeh, Hamidreza
2014-11-01
Today disasters are a part of many people's lives. Iran has a long history of disaster events and nurses are one of the most significant groups within the Iranian disaster relief operations, providing immediate and long-term care for those affected by the disaster. However, the technical competence of Iranian nurses and their training for this work has received little attention. This article presents the results of a study that aims to explore this context. A qualitative study was conducted using in-depth interviews to collect data from 30 nurses, who were deliberately selected from the health centers affiliated to the Isfahan University of Medical Sciences. Themes were identified using the conventional qualitative content analysis. The trustworthiness of the study was supported by considering the auditability, neutrality, consistency, and transferability. The study lasted from 2011 to 2012. Data analysis undertaken for the qualitative study resulted in the identification of five main themes, which included: (1) Management competences, (2) ethical and legal competences, (3) team working, and (4) personal abilities and the specific technical competences presented in this report. This report presents an overview of the nursing technical capabilities required for Iranian nurses during disaster relief. It is argued that additional competencies are required for nurses who care in high-risk situations, including disasters. Nurses need to prepare themselves more effectively to be responsible and effective in nursing care.
[Mathematical model of technical equipment of a clinical-diagnostic laboratory].
Bukin, S I; Busygin, D V; Tilevich, M E
1990-01-01
The paper is concerned with the problems of technical equipment of standard clinico-diagnostic laboratories (CDL) in this country. The authors suggest a mathematic model that may minimize expenditures for laboratory studies. The model enables the following problems to be solved: to issue scientifically-based recommendations for technical equipment of CDL; to validate the medico-technical requirements for newly devised items; to select the optimum types of uniform items; to define optimal technical decisions at the stage of the design; to determine the lab assistant's labour productivity and the cost of some investigations; to compute the medical laboratory engineering requirement for treatment and prophylactic institutions of this country.
2001-04-01
Information Dominance , Sustainment and Support, and Training. The study concludes: 1) the FCS concept is sound, but senior level attention is required to ensure technologies are ready for 2006 FCS EMD; and 2) Key technologies will significantly improve force projection and combat power. The Information Dominance Panel was tasked to: 1) Assess required sensors at National and Theater level; 2) Assess the technological opportunity to provide necessary bandwidth for data, voice and video requirements; 3) Ascertain the requirements to deny the threat
Author index to published ERTS-1 reports
Bidwell, Timothy C.; Mitchell, Cheryl A.
1975-01-01
This index has been compiled to assist the reader in locating and obtaining reports on the 334 scientific experiments conducted under the National Aeronautics and Space Administration (NASA) Earth Resources Technology Satellite-1 (ERTS-1) (renamed Landsat) program. Each NASA-designated experimenter was required to submit written reports on his investigation: these were designated type 1, type 2, and type 3 reports. Type 1 reports were periodic (monthly or bimonthly) progress summaries; type 2 were comprehensive scientific and technical reports; and type 3 were final report. Investigators were also encourage to present their more significant findings in professional or technical journals and proceedings of symposia.
Esophageal dilation with metal olives under fiberoptic endoscopic control: a new technic.
Mangla, J C; Kothari, T
1980-03-01
Three patients with marked strictures (less than 20 Fr.) of the esophagus are described. It was very difficult to institute any simple program of dilation because mercury-filled Maloney bougies will buckle and rigid endoscopy with dilation carries a great risk of perforation. Using the conventional methods such as Eder-Puestow dilation results in significant waste of time, money and fluoroscopic help. A new technic is described whereby a successful dilation was carried out under direct visual control by endoscopic dilation of the esophagus with Eder-Puestow dilators. Since all these patients require esophagoscopy, the dilation procedure can be done in the same sitting.
76 FR 80226 - Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
... final rule, effective upon publication. Generally, the Administrative Procedure Act (APA) requires a.... Additionally, the APA requires that a final rule must have a delayed effective date of 30 days from the date of... delayed effective date requirement under the APA. 5 U.S.C. 553(d)(3). Again the technical change conforms...
Competences in demand within the Spanish agricultural engineering sector
NASA Astrophysics Data System (ADS)
Perdigones, Alicia; Valera, Diego Luis; Moreda, Guillermo Pedro; García, Jose Luis
2014-09-01
The Rural Engineering Department (Technical University of Madrid) ran three competence surveys during the 2006-2007 and 2007-2008 academic years and evaluated: (1) the competences gained by agricultural engineer's degree and agricultural technical engineer's degree students (360 respondents); (2) the competences demanded by agricultural employers (50 farming sector employers); (3) competences required by farming sector professionals and former students (70 professionals). The surveys show significant differences between what competences agricultural employers require of graduates and the competences they acquire during their agricultural engineering degree courses. Recruiters are looking for generic competences such as the ability to coordinate groups and place less importance on knowledge of engineering, biology, applied economics and legislation. Of the computer-related competences, those most in demand by sector professionals were related to the use of Microsoft Office/Excel (used by 79% of professionals). Surveys were used to redesign some subjects of the degrees.
Defining Requirements and Related Methods for Designing Sensorized Garments
Andreoni, Giuseppe; Standoli, Carlo Emilio; Perego, Paolo
2016-01-01
Designing smart garments has strong interdisciplinary implications, specifically related to user and technical requirements, but also because of the very different applications they have: medicine, sport and fitness, lifestyle monitoring, workplace and job conditions analysis, etc. This paper aims to discuss some user, textile, and technical issues to be faced in sensorized clothes development. In relation to the user, the main requirements are anthropometric, gender-related, and aesthetical. In terms of these requirements, the user’s age, the target application, and fashion trends cannot be ignored, because they determine the compliance with the wearable system. Regarding textile requirements, functional factors—also influencing user comfort—are elasticity and washability, while more technical properties are the stability of the chemical agents’ effects for preserving the sensors’ efficacy and reliability, and assuring the proper duration of the product for the complete life cycle. From the technical side, the physiological issues are the most important: skin conductance, tolerance, irritation, and the effect of sweat and perspiration are key factors for reliable sensing. Other technical features such as battery size and duration, and the form factor of the sensor collector, should be considered, as they affect aesthetical requirements, which have proven to be crucial, as well as comfort and wearability. PMID:27240361
[ISO 15189 medical laboratory accreditation].
Aoyagi, Tsutomu
2004-10-01
This International Standard, based upon ISO/IEC 17025 and ISO 9001, provides requirements for competence and quality that are particular to medical laboratories. While this International Standard is intended for use throughout the currently recognized disciplines of medical laboratory services, those working in other services and disciplines will also find it useful and appropriate. In addition, bodies engaged in the recognition of the competence of medical laboratories will be able to use this International Standard as the basis for their activities. The Japan Accreditation Board for Conformity Assessment (AB) and the Japanese Committee for Clinical Laboratory Standards (CCLS) are jointly developing the program of accreditation of medical laboratories. ISO 15189 requirements consist of two parts, one is management requirements and the other is technical requirements. The former includes the requirements of all parts of ISO 9001, moreover it includes the requirement of conformity assessment body, for example, impartiality and independence from any other party. The latter includes the requirements of laboratory competence (e.g. personnel, facility, instrument, and examination methods), moreover it requires that laboratories shall participate proficiency testing(s) and laboratories' examination results shall have traceability of measurements and implement uncertainty of measurement. Implementation of ISO 15189 will result in a significant improvement in medical laboratories management system and their technical competence. The accreditation of medical laboratory will improve medical laboratory service and be useful for patients.
Technical writing versus technical writing
NASA Technical Reports Server (NTRS)
Dillingham, J. W.
1981-01-01
Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Park, Jung-Hoon; Kim, Pyeong Hwa; Shin, Ji Hoon, E-mail: jhshin@amc.seoul.kr
2016-11-15
PurposeThe purpose of the study was to retrospectively evaluate the technical outcomes of removal of retrievable self-expandable metallic stents (REMSs) and identify predictors of technical failure in 81 patients with benign and malignant tracheobronchial strictures.Materials and MethodsA total of 98 REMSs were removed under fluoroscopic guidance in 81 patients with benign (n = 48) or malignant (n = 33) tracheobronchial strictures. Primary and secondary technical success rates and complication rate were evaluated. Technical outcomes with regard to underlying diseases were also evaluated. Logistic regression models were constructed to identify predictors of primary technical success.ResultsPrimary and secondary technical success rates were 86.7 and 94.9 %, respectively.more » Stent removal-related complication rate was 7.1 % (7/98) and all were bleeding after stent removal. All bleeding complications were minor and managed conservatively. Primary technical success rate for benign strictures was significantly lower compared with that for malignant strictures (80.9 vs. 97.1 %, P = 0.029), but secondary technical success rate (93.7 vs. 97.1 %, P = 0.652) did not differ between the two groups. Granulation tissue formation was identified as an independent predictor of primary technical success (odds ratio 0.249, 95 % CI 0.071–0.874, P = 0.030).ConclusionRemoval of REMSs in patients with benign and malignant tracheobronchial strictures is safe and technically feasible. Bronchoscopic guidance may be required when the removal using a hook wire fails. The presence of granulation tissue was the negative predictor of primary technical success.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
...-0486; Amdt. No. 121-359] Removal of Six Month Line Check Requirement for Pilots Over Age 60; Technical... years of age that applied to air carriers engaged in part 121 operations. This technical amendment... December 13, 2007. This legislation raised the upper age limit for pilots in part 121 from age 60 to age 65...
Mills, M; Choi, J; El-Haddad, G; Sweeney, J; Biebel, B; Robinson, L; Antonia, S; Kumar, A; Kis, B
2017-12-01
To investigate the technical success rate and procedure-related complications of computed tomography (CT)-guided needle biopsy of lung lesions and to identify the factors that are correlated with the occurrence of procedure-related complications. This was a single- institution retrospective study of 867 consecutive CT-guided needle biopsies of lung lesions performed on 772 patients in a tertiary cancer centre. The technical success rate and complications were correlated with patient, lung lesion, and procedure-related variables. The technical success rate was 87.2% and the mortality rate was 0.12%. Of the 867 total biopsies 25.7% were associated with pneumothorax, and 6.5% required chest tube drainage. The haemothorax rate was 1.8%. There was positive correlation between the development of pneumothorax and smaller lesion diameter (p<0.001), longer transparenchymal distance (p<0.001), and prone position (p=0.027). There was positive correlation between the need for chest tube placement and longer transparenchymal distance (p=0.007) and smaller lesion diameter (p=0.018). Lesions in the left lower lobe had the lowest rates of pneumothorax (p=0.008) and chest tube drainage (p=0.018). Patients whose pneumothoraces were diagnosed on the follow-up chest X-ray, but not on the immediate post-procedural CT scan had significantly higher requirement for chest tube drainage (p=0.039). CT-guided lung biopsy has a high rate of technical success and a low rate of major complications. The present study has revealed several variables that can be used to identify high-risk procedures. A post-procedural chest X-ray within hours after the procedure is highly recommended to identify high-risk patients who require chest tube placement. Copyright © 2017 The Royal College of Radiologists. Published by Elsevier Ltd. All rights reserved.
Standardization of quantum technologies and QKD activities within ETSI (Conference Presentation)
NASA Astrophysics Data System (ADS)
Lenhart, Gaby
2016-04-01
In order to establish new ICT technologies successfully on the market it is essential to build trust within any potential users. This is especially true for technologies which are based upon paradigms that are not yet familiar to these users, such as quantum technologies. Technical standards are an excellent means to offer a certain degree of legal reliability and technical interoperability that is required by industry for commercial take up. While such standards on the one hand must be clear enough to provide strict rules for implementers, on the other hand they also must remain flexible enough to not restrict progress in further research and development on the standardized technology. Hence such standards have to be produced by a wide variety of stakeholders taking into account all their different needs. The paper will provide some insight into the general mechanisms of standardization and their relation to quantum technologies. Alongside with the relevance of standardization as an enabler for certification of quantum based technologies it will explain its potential for securing intellectual property. In its first part paper will concentrate on the advantages of standardization and discuss fears some of the stakeholders share, in detail. The second part will focus on the technical work going on in ETSI in relation to quantum technologies. In 2008 ETSI created a standards work group on Quantum Key Distribution, the ETSI ISG QKD and more recently a group on Quantum-Safe Cryptography, the ETSI ISG QSC. A significant part of the technical work of these groups has already been published and will be introduced in the following. However a big share of work is still ongoing and lot more is planned for the future, as are continuous revisions and updates of the published specifications. This standardization work covers several levels: It starts of by problem statements in the form of use cases, from which technical requirements can be derived. These requirements then form the base upon which a reference architecture is created. Various different specifications describe in detail components, protocols and interfaces. An ontology is developed in order to guarantee common understanding of the technical terms used in standardization for quantum technologies. Special emphasis is provided to security proofs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-11-01
This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed Interconnector between Swaziland and Mozambique. Volume 3 contains EPC Specifications and is divided into the following divisions: (1) Commercial; (2) General Technical Requirements; (3) Transmission Line Technical Requirements; (4) Substation Technical Requirements; (5) Specifications.
Flammable gas technical basis document
DOE Office of Scientific and Technical Information (OSTI.GOV)
CARRO, C.A.
2003-03-22
This document qualitatively evaluates the frequency and consequences of DST and SST representative flammable gas accidents and associated represented hazardous conditions without controls. Based on the evaluation, it was determined that safety-significant SSCs and/or TSRs were required to prevent or mitigate flammable gas accidents. Controls were selected and the accidents re-evaluated taking credit for the controls.
Heterogeneous IP Ecosystem enabling Reuse (HIER)
2017-03-22
Technical Approach and Justification IP reuse is a cornerstone of the commercial electronics market particularly in the digital domain...even in the digital domain. Significant investments in custom ASIC designs have been made by the government, but the IP resulting from such... approach to address requirements for that program. Research Plan The original vision for the HIER activity involved the evaluation
77 FR 24408 - Modification of Significant New Uses of Tris Carbamoyl Triazine; Technical Amendment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
...) determined that the placement of the correction text in that document did not satisfy OFR's format... final rule? Section 553 of the Administrative Procedure Act (APA), 5 U.S.C. 553(b)(3)(B), provides that... harm resulting from deleting the unnecessary requirement for a developmental effect warning. EPA finds...
Summary appraisals of the Nation's ground-water resources; Texas Gulf region
Baker, E.T.; Wall, James Ray
1974-01-01
Because significant amounts of ground water are available, the opportunities for expanded and conjunctive use of ground water and surface water should be considered in regional plans for water development and conservation. The complexities of water management and the difficulties of achieving an integrated system of total water management will require additional technical information.
Summary appraisals of the Nation's ground-water resources; Texas-Gulf region
Baker, E.T.; Wall, J.R.
1976-01-01
Because significant amounts of ground water are available, the opportunities for expanded and conjunctive use of ground water and surface water should be considered in regional plans for water development and conservation. The complexities of water management and the difficulties of achieving an integrated system of total-water management will require additional technical information.
NASA Technical Reports Server (NTRS)
McGhee, David S.
2005-01-01
Today's NASA is facing significant challenges and changes. The Exploration initiative indicates a large increase in projects with limited increase in budget. The Columbia report has criticized NASA for its lack of insight and technical integration impacting its ability to provide safety. The Aldridge report is advocating NASA find new ways of doing business. Very early in the Space Launch Initiative (SLI) program a small team of engineers at MSFC were asked to propose a process for performing a system level assessment of a launch vehicle. The request was aimed primarily at providing insight and making NASA a "smart buyer." Out of this effort the VIPA team was created. The difference between the VIPA effort and many integration attempts is that VIPA focuses on using experienced people from various disciplines and a process which focuses them on a technically integrated assessment. Most previous attempts have focused on developing an all encompassing software tool. In addition, VIPA anchored its process formulation in the experience of its members and in early developmental Space Shuttle experience. The primary reference for this is NASA-TP-2001-210092, "Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned," and discussions with its authors. The foundations of VIPA's process are described. The VIPA team also recognized the need to drive detailed analysis earlier in the design process. Analyses and techniques typically done in later design phases, are brought forward using improved computing technology. The intent is to allow the identification of significant sensitivities, trades, and design issues much earlier in the program. This process is driven by the T-model for Technical Integration described in the aforementioned reference. VIPA's approach to performing system level technical integration is discussed in detail. Proposed definitions are offered to clarify this discussion and the general systems integration dialog. VIPA's capabilities and process can now be used to significantly enhance the development and monitoring of realizable project requirements. This is done through the use of VIPA's V-model. Starting with a given concept, VIPA's assessment validates the concept's stated performance, identifies significant issues either with the concept or the requirements, and then re-integrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program's insight and review process. The VIPA process has been employed successfully on several projects including SLI, Orbital Space Plane (OSP), and several heavy lift concepts for Exploration. It has also been proposed for use on the Jupiter Icy Moon (JIMO) spacecraft. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful. Selected results from these assessments will be presented.
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Scientific and technical...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 952.242-70 - Technical direction.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (3) Reviewing and, where required by the contract, approving, technical reports, drawings... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...
48 CFR 35.010 - Scientific and technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Scientific and technical... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.010 Scientific and technical reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports...
Lambden, Simon; DeMunter, Claudine; Dowson, Anne; Cooper, Mehrengise; Gautama, Sanjay; Sevdalis, Nick
2013-06-01
To develop and test the feasibility, reliability, and validity of a practical toolkit for the assessment and feedback of skills required to manage paediatric emergencies in critical care settings. The Imperial Paediatric Emergency Training Toolkit (IPETT) was developed based on current evidence-base and expert input. IPETT assesses both technical and non-technical skills. The technical component covers skills in the areas of clinical assessment, airway and breathing, cardiovascular, and drugs. The non-technical component is based on the validated NOTECHS tool and covers communication and interaction, cooperation and team skills, leadership and managerial skills, and decision-making. The reliability (internal consistency), content validity (inter-correlations between different skills) and concurrent validity (correlations between global technical and non-technical scores) of IPETT were prospectively evaluated in 45 simulated paediatric crises carried out in a PICU with anaesthetic and paediatric trainees (N=52). Non-parametric analyses were carried out. Significance was set at P<0.05. Cronbach alpha reliability coefficients were overall acceptable for the technical (alpha range=0.638-0.810) and good for the non-technical (alpha range=0.701-0.899) component of IPETT. The median inter-skill correlation was rho=0.564 and rho=0.549 for the technical and non-technical components, respectively. These indicate good content validity, as the skills were inter-related but not redundant. We also demonstrate a correlation between the global technical and non-technical scores (rho=0.471) - all Ps<0.05 during the assessments. IPETT offers a psychometrically viable and feasible to use tool in the context of paediatric emergencies training. This study shows that assessment of technical and non-technical skills in combination may offer a more clinically relevant model for training in paediatric emergencies. Further validation should aim to demonstrate skill retention over time and skill transfer from simulation-based training to real emergencies. Copyright © 2013. Published by Elsevier Ireland Ltd.
10 CFR 600.144 - Procurement procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... integrity, record of past performance, financial and technical resources or accessibility to other necessary... DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES Uniform Administrative... practicable, of technical requirements in terms of functions to be performed or performance required...
11 CFR 9033.12 - Production of computerized information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...
11 CFR 9033.12 - Production of computerized information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...
11 CFR 9033.12 - Production of computerized information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... conform to the technical specifications, including file requirements, described in the Federal Election Commission's Computerized Magnetic Media Requirements for title 26 Candidates/Committees Receiving Federal... outstanding campaign obligations. (b) Organization of computerized information and technical specifications...
Technical Efficiency of Hospitals in Tehran, Iran.
Kakeman, Edris; Rahimi Forushani, Abbas; Dargahi, Hossein
2016-04-01
Nowadays, restriction on access and optimum use of resources is the main challenge of development in all organizations. Therefore, the aim of this study was to determine the technical efficiency and its factors, influencing hospitals of Tehran. This research was a descriptive-analytical and retrospective study conducted in 2014-2015. Fifty two hospitals with public, private, and social security ownership type were selected for this study. The required data was collected by a researcher-made check list in 3 sections of background data, inputs and outputs. The data was analyzed by DEAP 1.0.2, and STATA-13 technique. Seventeen (31/48) of hospitals had the efficiency score of 1 as the highest technical efficiency. The highest average score of efficiency was related to social security hospitals as 84.32, and then the public and private hospitals with the average of 84.29 and 79.64 respectively. Tobit regression results showed that the size, type of practice, and ownership of hospitals were effective on the degree of their technical efficiency. However, there was no significant correlation between teaching / non-teaching hospitals with technical efficiency. Establishment of competition system among hospitals, constitution of medium size hospitals and allocation of budget to hospitals based on national accreditation system are recommended.
Mori, Genki; Nonaka, Satoru; Oda, Ichiro; Abe, Seiichiro; Suzuki, Haruhisa; Yoshinaga, Shigetaka; Nakajima, Takeshi; Saito, Yutaka
2015-01-01
Background and study aims: Endoscopic submucosal dissection (ESD) using insulation-tipped knives (IT knives) to treat gastric lesions located on the greater curvature of the gastric body remains technically challenging because of the associated bleeding, control of which can be difficult and time consuming. To eliminate these difficulties, we developed a novel strategy which we have called the “near-side approach method” and assessed its utility. Patients and methods: We reviewed patients who underwent ESD for solitary early gastric cancer located on the greater curvature of the gastric body from January 2003 to September 2014. The technical results of ESD were compared between the group treated with the novel near-side approach method and the group treated with the conventional method. Results: This study included 238 patients with 238 lesions, 118 of which were removed using the near-side approach method and 120 of which were removed using the conventional method. The median procedure time was 92 minutes for the near-side approach method and 120 minutes for the conventional method. The procedure time was significantly shorter in the near-side approach method arm. Although, the procedure time required by an experienced endoscopist was not significantly different between the two groups (100 vs. 110 minutes), the near-side approach group showed significantly shorter procedure time for a less-experienced endoscopist (90 vs. 120 minutes). Conclusions: The near-side approach method appears to require less time to complete gastric ESD than the conventional method using IT knives for technically challenging lesions located on the greater curvature of the gastric body, especially if the procedure is performed by less-experienced endoscopists. PMID:26528496
Grant, P M; Field, T G; Green, R D; Rollin, B E
2000-06-01
Any thorough examination of the present and future of agricultural education must certainly begin with a look into its past. Since the creation of the United States, many leading American philosophers have viewed a strong agrarian culture as the bedrock of American vigor. These same philosophers repeatedly noted the significance of comprehensive agricultural education to a nation rich in agricultural wealth. The signing of the Agricultural Colleges Act legitimized the concept of formal education in the agricultural sciences and provided funding for such education. The Act, which came to be known as the Morrill Act, after one of its primary authors, stressed the importance of comprehensive education. In fact, the inclusion of liberal studies was specifically mentioned in the Morrill Act and was defended repeatedly by Morrill himself. Comprehensive education prevented graduating technically trained students who were lacking in the basic outcomes of education--critical, comprehensive problem solving, cohesive thought, and effective communication. However, throughout history, the demands of a growing population coupled with rapid advancements in scientific knowledge led to a gradual move away from comprehensive education in agricultural sciences toward increasing specialization, resulting in more narrowly trained students. Today's agricultural students are technically well versed but often lack the skill and knowledge required for cohesive thought and critical problem solving. Addressing the multitude of challenges facing leaders in the future of agriculture requires much more than technical skill. These challenges require quick, yet careful thinkers and communicators who can respond to changing market structure and consumer demand in a dynamic way. Students who are a product of a conscious move toward amalgamation of burgeoning scientific knowledge and technical prowess with an integrative education emphasizing relationships between disciplines would better serve tomorrow's agriculture.
Getting Personal: Individuality, Innovation, and Technical Communication.
ERIC Educational Resources Information Center
Steiner, Carol J.
1999-01-01
Suggests that effective communication between technical and nontechnical people is difficult because technical communication lacks a personal dimension: technical people give up their identity to be considered competent. Argues that a different approach to communication education for scientists, engineers, and technologists is required to equip…
48 CFR 2052.216-72 - Task order procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
...; (5) Technical skills required; and (6) Estimated level of effort. (b) Task order technical proposal. By the date specified in the TORFP, the contractor shall deliver to the contracting officer a written or verbal (as specified in the TORFP technical proposal submittal instructions) technical proposal...
48 CFR 811.103-70 - Technical industry standards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...
48 CFR 811.103-70 - Technical industry standards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...
48 CFR 811.103-70 - Technical industry standards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...
48 CFR 811.103-70 - Technical industry standards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry... Documents 811.103-70 Technical industry standards. Where items are required to conform to technical industry... organizations, where such standards are generally recognized and accepted in the industry involved, the...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2011 CFR
2011-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
48 CFR 935.010 - Scientific and technical reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
... information. The DOE Order 241.1B Scientific and Technical Information Management, or its successor version... conveyed in scientific and technical information (STI) shall include an instruction requiring the.... Department of Energy (DOE), Office of Scientific and Technical Information (OSTI), using the DOE Energy Link...
24 CFR 891.175 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 891.175... Requirements § 891.175 Technical assistance. For purposes of the Section 202 Program and the Section 811 Program, the Secretary shall make available appropriate technical assistance to assure that applicants...
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Strykowsky, T. Brown, J. Chrzanowski, M. Cole, P. Heitzenroeder, G.H. Neilson, Donald Rej, and M. Viola
The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative fusion energy confinement device developed by the Princeton Plasma Physics Laboratory (PPPL) and Oak Ridge National Laboratory (ORNL) under contract from the US Department of Energy. The project was technically very challenging, primarily due to the complex component geometries and tight tolerances that were required. As the project matured these challenges manifested themselves in significant cost overruns through all phases of the project (i.e. design, R&D, fabrication and assembly). The project was subsequently cancelled by the DOE in 2008. Although the project was not completed,more » several major work packages, comprising about 65% of the total estimated cost (excluding management and contingency), were completed, providing a data base of actual costs that can be analyzed to understand cost drivers. Technical factors that drove costs included the complex geometry, tight tolerances, material requirements, and performance requirements. Management factors included imposed annual funding constraints that throttled project cash flow, staff availability, and inadequate R&D. Understanding how requirements and design decisions drove cost through this top-down forensic cost analysis could provide valuable insight into the configuration and design of future state-of-the art machines and other devices.« less
How engineers perceive the importance of ethics in Finland
NASA Astrophysics Data System (ADS)
Taajamaa, Ville; Majanoja, Anne-Maarit; Bairaktarova, Diana; Airola, Antti; Pahikkala, Tapio; Sutinen, Erkki
2018-01-01
Success in complex and holistic engineering practices requires more than problem-solving abilities and technical competencies. Engineering education must offer proficient technical competences and also train engineers to think and act ethically. A technical 'engineering-like' focus and demand have made educators and students overlook the importance of ethical awareness and transversal competences. Using two Finnish surveys, conducted in 2014 and 2016, we examine how engineers perceive working life needs regarding ethics. The data consider different age groups. We research whether an engineer's age affects their perception of the importance of ethics in their work and if there are differences between young experts and young managers in their use of ethics within work. The results indicate that practising engineers do not consider ethical issues important in their work. This especially applies to younger engineers; the older an engineer, the more important they consider ethics. No statistically significant difference was found between young engineering experts and managers.
Szuba, Marek
2006-01-01
This paper presents the most important elements of the localization procedure of high voltage overhead lines and substations and radiocommunication objects which are the source of electromagnetic fields. These fields are perceived as a major threat to human health. The point of departure to make a choice of investments is the special classification of technical installations described in one of the executive directive issued by virtue of the Environmental Protection Act. This special executive directive enumerates a lot of technical objects (installation), classified in the group of investments which have significant impact on the environment and some objects which could be classified in this group. For all this technical installations (e.g., overhead high voltage power lines) the provisions of the Environmental Protection Act impose an obligation to take particular steps to assure transparency of the environmental protection procedures, transborder procedures and the protection of areas included in the Natura 2000 network.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND TECHNICAL DATA; REQUIREMENTS TO NOTIFY CONSUMERS AT POINT OF PURCHASE OF PERFORMANCE AND TECHNICAL... technical data to prospective purchasers of such products at the time of original purchase and to the first...
Technical Support Document for Title V Permitting of Printing Facilities
Stationary source emissions monitoring is required to demonstrate that a source is meeting the requirements in Federal or state rules, including Title V. This document provides the technical support for compliance in the printing and publishing industry.
47 CFR 18.109 - General technical requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...
47 CFR 18.109 - General technical requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...
47 CFR 18.109 - General technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...
47 CFR 18.109 - General technical requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...
47 CFR 18.109 - General technical requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false General technical requirements. 18.109 Section 18.109 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND... designed and constructed in accordance with good engineering practice with sufficient shielding and...
Non-technical skills of surgical trainees and experienced surgeons.
Gostlow, H; Marlow, N; Thomas, M J W; Hewett, P J; Kiermeier, A; Babidge, W; Altree, M; Pena, G; Maddern, G
2017-05-01
In addition to technical expertise, surgical competence requires effective non-technical skills to ensure patient safety and maintenance of standards. Recently the Royal Australasian College of Surgeons implemented a new Surgical Education and Training (SET) curriculum that incorporated non-technical skills considered essential for a competent surgeon. This study sought to compare the non-technical skills of experienced surgeons who completed their training before the introduction of SET with the non-technical skills of more recent trainees. Surgical trainees and experienced surgeons undertook a simulated scenario designed to challenge their non-technical skills. Scenarios were video recorded and participants were assessed using the Non-Technical Skills for Surgeons (NOTSS) scoring system. Participants were divided into subgroups according to years of experience and their NOTSS scores were compared. For most NOTSS elements, mean scores increased initially, peaking around the time of Fellowship, before decreasing roughly linearly over time. There was a significant downward trend in score with increasing years since being awarded Fellowship for six of the 12 NOTSS elements: considering options (score -0·015 units per year), implementing and reviewing decisions (-0·020 per year), establishing a shared understanding (-0·014 per year), setting and maintaining standards (-0·024 per year), supporting others (-0·031 per year) and coping with pressure (-0·015 per year). The drop in NOTSS score was unexpected and highlights that even experienced surgeons are not immune to deficiencies in non-technical skills. Consideration should be given to continuing professional development programmes focusing on non-technical skills, regardless of the level of professional experience. © 2017 BJS Society Ltd Published by John Wiley & Sons Ltd.
32 CFR 202.13 - Technical assistance for public participation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Reporting Requirements § 202.13 Technical assistance for public participation. Community members of a RAB or TRC may request technical assistance for interpreting scientific and engineering issues with regard to...
Standards Advisor-Advanced Information Technology for Advanced Information Delivery
NASA Technical Reports Server (NTRS)
Hawker, J. Scott
2003-01-01
Developers of space systems must deal with an increasing amount of information in responding to extensive requirements and standards from numerous sources. Accessing these requirements and standards, understanding them, comparing them, negotiating them and responding to them is often an overwhelming task. There are resources to aid the space systems developer, such as lessons learned and best practices. Again, though, accessing, understanding, and using this information is often more difficult than helpful. This results in space systems that: 1. Do not meet all their requirements. 2. Do not incorporate prior engineering experience. 3. Cost more to develop. 4. Take longer to develop. The NASA Technical Standards Program (NTSP) web site at http://standards.nasa.gov has made significant improvements in making standards, lessons learned, and related material available to space systems developers agency-wide. The Standards Advisor was conceived to take the next steps beyond the current product, continuing to apply evolving information technology that continues to improve information delivery to space systems developers. This report describes the features of the Standards Advisor and suggests a technical approach to its development.
42 CFR 493.1411 - Standard; Technical consultant qualifications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... training or experience to provide technical consultation for each of the specialties and subspecialties of... responsible. Note: The technical consultant requirements for “laboratory training or experience, or both” in... 42 Public Health 5 2010-10-01 2010-10-01 false Standard; Technical consultant qualifications. 493...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 2052.215-71 - Project officer authority.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...
48 CFR 852.211-72 - Technical industry standards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...
48 CFR 852.211-72 - Technical industry standards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...
48 CFR 852.211-72 - Technical industry standards.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...
48 CFR 852.211-72 - Technical industry standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...
48 CFR 852.211-72 - Technical industry standards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Technical industry....211-72 Technical industry standards. As prescribed in 811.103-70, insert the following provision: Technical Industry Standards (JAN 2008) The supplies or equipment required by this invitation for bid or...
HNSciCloud - Overview and technical Challenges
NASA Astrophysics Data System (ADS)
Gasthuber, Martin; Meinhard, Helge; Jones, Robert
2017-10-01
HEP is only one of many sciences with sharply increasing compute requirements that cannot be met by profiting from Moore’s law alone. Commercial clouds potentially allow for realising larger economies of scale. While some small-scale experience requiring dedicated effort has been collected, public cloud resources have not been integrated yet with the standard workflows of science organisations in their private data centres; in addition, European science has not ramped up to significant scale yet. The HELIX NEBULA Science Cloud project - HNSciCloud, partly funded by the European Commission, addresses these points. Ten organisations under CERN’s leadership, covering particle physics, bioinformatics, photon science and other sciences, have joined to procure public cloud resources as well as dedicated development efforts towards this integration. The HNSciCloud project faces the challenge to accelerate developments performed by the selected commercial providers. In order to guarantee cost efficient usage of IaaS resources across a wide range of scientific communities, the technical requirements had to be carefully constructed. With respect to current IaaS offerings, dataintensive science is the biggest challenge; other points that need to be addressed concern identity federations, network connectivity and how to match business practices of large IaaS providers with those of public research organisations. In the first section, this paper will give an overview of the project and explain the findings so far. The last section will explain the key points of the technical requirements and present first results of the experience of the procurers with the services in comparison to their’on-premise’ infrastructure.
Code of Federal Regulations, 2013 CFR
2013-07-01
... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... was issued. Equivalent non-MSHA product safety standards. A non-MSHA product safety standard, or group... this part. Applicant. An individual or organization that manufactures or controls the assembly of a... technical requirements and have been manufactured as approved. Technical requirements. The design and...
Code of Federal Regulations, 2010 CFR
2010-01-01
... requirements set forth in this part 802 describe certain specifications, tolerances, and other technical... Standards and Technology (NIST) Handbook 44, “Specifications, Tolerances, and Other Technical Requirements...), “Specifications and Tolerances for Reference Standards and Field Standard Weights and Measures,” (Handbook 105-1...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
..., WG-1, Wake Vortex, ARINC Room. RTCA--All Day, WG-4, Application Technical Requirements, Colson Board... Vortex, MacIntosh-NBAA Room & Hilton-ATA Room. RTCA--All Day, WG-4, Application Technical Requirements...
Technical Assistance Needs Assessments (TANAs)
The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.
ERIC Educational Resources Information Center
Staklis, Sandra; Klein, Steven
2010-01-01
Since the mid-1990s, the Pennsylvania Department of Education (PDE) has required all students concentrating in career and technical education (CTE) programs to complete a standardized technical skill assessment at or near the end of their program. Results of technical skill assessments are used for a number of purposes, including recognizing…
Assessing Students' Technical Skill Attainment
ERIC Educational Resources Information Center
Jorgensen, Haley
2010-01-01
The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-17
... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Affairs Acquisition Regulation (VAAR) Provision 852.211-72 (formerly 852.211-75), Technical Industry.... Abstract: VAAR provision 852.211-72, Technical Industry Standards, requires items offered for sale to VA...
Do PICU patients meet technical criteria for performing indirect calorimetry?
Beggs, Megan R; Garcia Guerra, Gonzalo; Larsen, Bodil M K
2016-10-01
Indirect calorimetry (IC) is considered gold standard for assessing energy needs of critically ill children as predictive equations and clinical status indicators are often unreliable. Accurate assessment of energy requirements in this vulnerable population is essential given the high risk of over or underfeeding and the consequences thereof. The proportion of patients and patient days in pediatric intensive care (PICU) for which energy expenditure (EE) can be measured using IC is currently unknown. In the current study, we aimed to quantify the daily proportion of consecutive PICU patients who met technical criteria to perform indirect calorimetry and describe the technical contraindications when criteria were not met. Prospective, observational, single-centre study conducted in a cardiac and general PICU. All consecutive patients admitted for at least 96 h were included in the study. Variables collected for each patient included age at admission, admission diagnosis, and if technical criteria for indirect calorimetry were met. Technical criteria variables were collected within the same 2 h each morning and include: provision of supplemental oxygen, ventilator settings, endotracheal tube (ETT) leak, diagnosis of chest tube air leak, provision of external gas support (i.e. nitric oxide), and provision of extracorporeal membrane oxygenation (ECMO). 288 patients were included for a total of 3590 patient days between June 2014 and February 2015. The main reasons for admission were: surgery (cardiac and non-cardiac), respiratory distress, trauma, oncology and medicine/other. The median (interquartile range) patient age was 0.7 (0.3-4.6) years. The median length of PICU stay was 7 (5-14) days. Only 34% (95% CI, 32.4-35.5%) of patient days met technical criteria for IC. For patients less than 6 months of age, technical criteria were met on significantly fewer patient days (29%, p < 0.01). Moreover, 27% of patients did not meet technical criteria for IC on any day during their PICU stay. Most frequent reasons for why IC could not be performed included supplemental oxygen, ECMO, and ETT leak. In the current study, technical criteria to perform IC in the PICU were not met for 27% of patients and were not met on 66% of patient days. Moreover, criteria were met on only 29% of days for infants 6 months and younger where children 24 months of age and older still only met criteria on 40% of patient days. This data represents a major gap in the feasibility of current recommendations for assessing energy requirements of this population. Future studies are needed to improve methods of predicting and measuring energy requirements in critically ill children who do not meet current criteria for indirect calorimetry. Copyright © 2016 European Society for Clinical Nutrition and Metabolism. Published by Elsevier Ltd. All rights reserved.
Flammable Gas Technical Basis Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
CARRO, C.A.
2003-07-30
This document qualitatively evaluates the frequency and consequences of DST and SST representative flammable gas accidents and associated represented hazardous conditions without controls. Based on the evaluation, it was determined that safety-significant SSCs and/or TSRs were required to prevent or mitigate flammable gas accidents. Controls were selected and the accidents re-evaluated taking credit for the controls. Revision 1 incorporates comments received from ORP.
Operational Suitability Guide. Volume 2. Templates
1990-05-01
Intended mission, and the required technical and operational characteristics. The mission must be adequately defined and key hardware and software ...operational availability. With the use of fault-tolerant computer hardware and software , the system R&M will significantly improve end-to-end...should Include both hardware and software elements, as appropriate. Unique characteristics or unique support concepts should be Identified if they result
Addressing An Audience: A Study of Expert-Novice Differences in Writing. Technical Report No. 3.
ERIC Educational Resources Information Center
Atlas, Marshall A.
To investigate differences in the writing processes of novice and expert writers, a test of writing skills was developed that required subjects to write a business letter in defense of a particular system of public transportation in response to a letter objecting to that system. In the first of three experiments, significant differences were found…
NASA Astrophysics Data System (ADS)
Evetts, S. N.
2014-08-01
The human exploration of space is pushing the boundaries of what is technically feasible. The space industry is preparing for the New Space era, the momentum for which will emanate from the commercial human spaceflight sector, and will be buttressed by international solar system exploration endeavours. With many distinctive technical challenges to be overcome, human spaceflight requires that numerous biological and physical systems be examined under exceptional circumstances for progress to be made. To effectively tackle such an undertaking significant intra- and international coordination and collaboration is required. Space life and biomedical science research and development (R & D) will support the Global Exploration Roadmap (GER) by enabling humans to 'endure' the extreme activity that is long duration human spaceflight. In so doing the field will discover solutions to some of our most difficult human health issues, and as a consequence benefit society as a whole. This space-specific R&D will drive a significant amount of terrestrial biomedical research and as a result the international community will not only gain benefits in the form of improved healthcare in space and on Earth, but also through the growth of its science base and industry.
Space Resource Requirements for Future In-Space Propellant Production Depots
NASA Technical Reports Server (NTRS)
Smitherman, David; Fikes, John; Roy, Stephanie; Henley, Mark W.; Potter, Seth D.; Howell, Joe T. (Technical Monitor)
2001-01-01
In 2000 and 2001 studies were conducted at the NASA Marshall Space Flight Center on the technical requirements and commercial potential for propellant production depots in low Earth orbit (LEO) to support future commercial, NASA, and other Agency missions. Results indicate that propellant production depots appear to be technically feasible given continued technology development, and there is a substantial growing market that depots could support. Systems studies showed that the most expensive part of transferring payloads to geosynchronous orbit (GEO) is the fuel. A cryogenic propellant production and storage depot stationed in LEO could lower the cost of missions to GEO and beyond. Propellant production separates water into hydrogen and oxygen through electrolysis. This process utilizes large amounts of power, therefore a depot derived from advanced space solar power technology was defined. Results indicate that in the coming decades there could be a significant demand for water-based propellants from Earth, moon, or asteroid resources if in-space transfer vehicles (upper stages) transitioned to reusable systems using water based propellants. This type of strategic planning move could create a substantial commercial market for space resources development, and ultimately lead toward significant commercial infrastructure development within the Earth-Moon system.
Integrated orbital servicing study follow-on. Volume 2: Technical analysis and system design
NASA Technical Reports Server (NTRS)
1978-01-01
In-orbit service functional and physical requirements to support both low and high Earth orbit servicing/maintenance operations were defined, an optimum servicing system configuration was developed and mockups and early prototype hardware were fabricated to demonstrate and validate the concepts selected. Significant issues addressed include criteria for concept selection; representative mission equipment and approaches to their design for serviceability; significant serviceable spacecraft design aspects; servicer mechanism operation in one-g; approaches for the demonstration/simulation; and service mechanism structure design approach.
Development of drilling foams for geothermal applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, W.J.; Remont, L.J.; Rehm, W.A.
The use of foam drilling fluids in geothermal applications is addressed. A description of foams - what they are, how they are used, their properties, equipment required to use them, the advantages and disadvantages of foams, etc. - is presented. Geothermal applications are discussed. Results of industry interviews presented indicate significant potential for foams, but also indicate significant technical problems to be solved to achieve this potential. Testing procedures and results of tests on representative foams provide a basis for work to develop high-temperature foams.
Bioelectronic retinal prosthesis
NASA Astrophysics Data System (ADS)
Weiland, James D.
2016-05-01
Retinal prosthesis have been translated to clinical use over the past two decades. Currently, two devices have regulatory approval for the treatment of retinitis pigmentosa and one device is in clinical trials for treatment of age-related macular degeneration. These devices provide partial sight restoration and patients use this improved vision in their everyday lives to navigate and to detect large objects. However, significant vision restoration will require both better technology and improved understanding of the interaction between electrical stimulation and the retina. In particular, current retinal prostheses do not provide peripheral visions due to technical and surgical limitations, thus limiting the effectiveness of the treatment. This paper reviews recent results from human implant patients and presents technical approaches for peripheral vision.
13 CFR 306.3 - Application requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...
47 CFR 80.271 - Technical requirements for portable survival craft radiotelephone transceivers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... craft radiotelephone transceivers. 80.271 Section 80.271 Telecommunication FEDERAL COMMUNICATIONS... Authorization for Compulsory Ships § 80.271 Technical requirements for portable survival craft radiotelephone transceivers. (a) Portable survival craft radiotelephone transceivers must comply with the following: (1) The...
13 CFR 306.3 - Application requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...
13 CFR 306.3 - Application requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...
13 CFR 306.3 - Application requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...
13 CFR 306.3 - Application requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Application requirements. 306.3 Section 306.3 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE TRAINING, RESEARCH AND TECHNICAL ASSISTANCE INVESTMENTS Local and National Technical Assistance § 306.3...
47 CFR 22.377 - Certification of transmitters.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.377 Certification of transmitters. Except as provided in paragraph (b) of this section, transmitters used in the Public Mobile Services, including those used with signal boosters, in-building radiation systems and cellular repeaters...
Data Requirements Review Boards and Their Importance
2016-02-01
data: technical data, which are recorded technical or scientific information (not including computer software), and contractual or financial and...navy.mil. References for This Article and Other Useful Sources NAVAIRINST 4200.21E—Naval Air SystemsCommand Data Requirements Review Board DoD
Brown, Michael; Shaw, Dominick; Sharples, Sarah; Jeune, Ivan Le; Blakey, John
2015-02-16
The skill set required for junior doctors to work efficiently and safely Out of Hours (OoH) in hospitals has not been established. This is despite the OoH period representing 75% of the year and it being the time of highest mortality. We set out to explore the expectations of medical students and experiences of junior doctors of the non-technical skills needed to work OoH. Survey-based cross-sectional study informed by focus groups. Online survey with participants from five large teaching hospitals across the UK. 300 Medical Students and Doctors Participants ranked the importance of non-technical skills, as identified by literature review and focus groups, needed for OoH care. The focus groups revealed a total of eight non-technical skills deemed to be important. In the survey 'Task Prioritisation' (mean rank 1.617) was consistently identified as the most important non-technical skill. Stage of training affected the ranking of skills, with significant differences for 'Communication with Senior Doctors', 'Dealing with Clinical Isolation', 'Task Prioritisation' and 'Communication with Patients'. Importantly, there was a significant discrepancy between the medical student expectations and experiences of doctors undertaking work. Our findings suggest that medical staff particularly value task prioritisation skills; however, these are not routinely taught in medical schools. The discrepancy between expectations of students and experience of doctors reinforces the idea that there is a gap in training. Doctors of different grades place different importance on specific non-technical skills with implications for postgraduate training. There is a pressing need for medical schools and deaneries to review non-technical training to include more than communication skills. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Improving and monitoring air quality.
DuPont, André
2018-05-01
Since the authorization of the Clean Air Act Amendments of 1990, the air quality in the USA has significantly improved because of strong public support. The lessons learned over the last 25 years are being shared with the policy analysts, technical professionals, and scientist who endeavor to improve air quality in their communities. This paper will review how the USA has achieved the "high" standard of air quality that was envisioned in the early 1990s. This document will describe SO 2 gas emission reduction technology and highlight operation of emission monitoring technology. This paper describes the basic process operation of an air pollution control scrubber. A technical review of measures required to operate and maintain a large-scale pollution control system will be described. Also, the author explains how quality assurance procedures in performance of continuous emission monitoring plays a significant role in reducing air pollution.
Managing Information On Technical Requirements
NASA Technical Reports Server (NTRS)
Mauldin, Lemuel E., III; Hammond, Dana P.
1993-01-01
Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.
Public perception of the terms "cosmetic," "plastic," and "reconstructive" surgery.
Hamilton, Grant S; Carrithers, Jeffrey S; Karnell, Lucy H
2004-01-01
To investigate potential differences in perception of the terms "cosmetic," "plastic," and "reconstructive" as descriptors for surgery. An anonymous questionnaire was offered to subjects over 18 years of age throughout the Unites States via the Internet and in person. The multiple-choice survey measured variables including permanence, risk, expense, recovery, reversibility, pain, technical difficulty, and surgeon training. The questionnaire also included several open-ended questions to capture qualitative perceptions. Semantic differential data were analyzed to measure statistical significance. For most variables--permanence, risk, recovery, reversibility, pain, and surgeon training--the 216 subjects had significantly lower mean responses for cosmetic surgery than those for plastic or reconstructive surgery (P < .002). Overall, the results of this study support the authors' hypothesis that there is a significant difference in perception of cosmetic surgery and plastic or reconstructive surgery. Cosmetic surgery is perceived to be more temporary and less technically difficult than plastic or reconstructive surgery. In addition, cosmetic surgery is believed to be associated with less risk, shorter recovery time, and less pain. Subjects also thought that cosmetic surgeons required significantly less training than plastic or reconstructive surgeons.
1988-01-01
system requirements, design guidelines, and interface requirements has been prepared and included as Volume II of this Task 1 topical report. The Volume ...WAESD-TR-88-0002 Conceptual Design Of A Space-Based Multimegawatt MHD Power System ffA«kjjjjjTfc Task 1 Topical Report Volume I: Technical...Space-Based Multimegawatt MHD Power System: Task 1 Topical Report, Volume I: Technical Discussion Personal Author: Dana, RA. Corporate Author Or
Technical requirements for bioassay support services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hickman, D.P.; Anderson, A.L.
1991-05-01
This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are alsomore » addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.« less
47 CFR 15.611 - General technical requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false General technical requirements. 15.611 Section 15.611 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Access... shut-off procedure, by the use of a non-volatile memory, or some other method, to immediately restore...
47 CFR 22.383 - In-building radiation systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for...
47 CFR 74.861 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., AUXILIARY, SPECIAL BROADCAST AND OTHER PROGRAM DISTRIBUTIONAL SERVICES Low Power Auxiliary Stations § 74.861 Technical requirements. (a) Transmitter power is the power at the transmitter output terminals and delivered... the purpose of this subpart, the transmitter power is the carrier power. (b) Each authorization for a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-D-0588] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Draft Guidance for Industry on Pharmacovigilance of Veterinary Medicinal Products: Electronic...
NASA Astrophysics Data System (ADS)
Chan, Y. David; Rastegar, Abbas; Yun, Henry; Putna, E. Steve; Wurm, Stefan
2010-04-01
Reducing mask blank and patterned mask defects is the number one challenge for extreme ultraviolet lithography. If the industry succeeds in reducing mask blank defects at the required rate of 10X every year for the next 2-3 years to meet high volume manufacturing defect requirements, new inspection and review tool capabilities will soon be needed to support this goal. This paper outlines the defect inspection and review tool technical requirements and suggests development plans to achieve pilot line readiness in 2011/12 and high volume manufacturing readiness in 2013. The technical specifications, tooling scenarios, and development plans were produced by a SEMATECH-led technical working group with broad industry participation from material suppliers, tool suppliers, mask houses, integrated device manufacturers, and consortia. The paper summarizes this technical working group's assessment of existing blank and mask inspection/review infrastructure capabilities to support pilot line introduction and outlines infrastructure development requirements and tooling strategies to support high volume manufacturing.
Soft Skills: The New Curriculum for Hard-Core Technical Professionals
ERIC Educational Resources Information Center
Bancino, Randy; Zevalkink, Claire
2007-01-01
In this article, the authors talk about the importance of soft skills for hard-core technical professionals. In many technical professions, the complete focus of education and training is on technical topics either directly or indirectly related to a career or discipline. Students are generally required to master various mathematics skills,…
30 CFR 777.13 - Reporting of technical data.
Code of Federal Regulations, 2010 CFR
2010-07-01
... descriptions of the methodology used to collect and analyze the data. (b) Technical analyses shall be planned... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reporting of technical data. 777.13 Section 777... PROGRAMS GENERAL CONTENT REQUIREMENTS FOR PERMIT APPLICATIONS § 777.13 Reporting of technical data. (a) All...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-30
... Technical Barriers to Trade (2012 TBT Report) respectively. The TPSC invites written comments from the... Reports on Sanitary and Phytosanitary and Technical Barriers to Trade AGENCY: Office of the United States... (USTR) is required to publish annually the Reports on Sanitary and Phytosanitary and Technical Barriers...
Code of Federal Regulations, 2010 CFR
2010-10-01
... and marking of technical data to be furnished with restrictive markings. 227.7103-10 Section 227.7103... DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-10 Contractor identification and marking of technical data to be furnished with restrictive markings...
NATO Scientific and Technical Information Service (NSTIS): functional description. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Molholm, K.N.; Blados, W.N.; Bulca, C.
1987-08-01
This report provides a functional description of the requirements for a NATO Scientific and Technical Information Service (NSTIS). The user requirements and much of the background information in this report were derived primarily from interviews with more than 60 NATO Headquarters staff members between 2 March and 25 March 1987. In addition, representatives of the Supreme Headquarters Applied Powers Europe (SHAPE) Technical Centre (STC), the Supreme Allied Commander Atlantic (Anti-Submarine Warfare Research) Centre (SACLANTCEN), the NATO Communications and Information Systems Agency (NACISA), The Advisory Group for Aerospace Research and Development (AGARD), the U.S. Defense Technical Information Center (DTIC), and themore » Technical Documentation Center for the Armed Forces in the Netherlands (TDCK), were interviewed, either in person or by telephone.« less
30 CFR 7.24 - Technical requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...
30 CFR 7.24 - Technical requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...
30 CFR 7.24 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...
30 CFR 7.24 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...
30 CFR 7.24 - Technical requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Brattice Cloth and Ventilation Tubing § 7.24 Technical requirements. (a) Brattice cloth shall be flame resistant when tested in accordance with... MSHA-approved brattice cloth. If a supporting structure is used, it shall be metal or other...
47 CFR 22.377 - Certification of transmitters.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.377 Certification of transmitters. Except as provided in paragraph (b) of this section, transmitters used in the Public Mobile... certificated when the station is ready for service, not necessarily at the time of filing an application. (a...
A new generation of real-time DOS technology for mission-oriented system integration and operation
NASA Technical Reports Server (NTRS)
Jensen, E. Douglas
1988-01-01
Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.
47 CFR 22.357 - Emission types.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Emission types. 22.357 Section 22.357... Operational and Technical Requirements Technical Requirements § 22.357 Emission types. Any authorized station in the Public Mobile Services may transmit emissions of any type(s) that comply with the applicable...
10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...
10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...
10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...
10 CFR 35.647 - Additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Additional technical requirements for mobile remote afterloader units. 35.647 Section 35.647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery...
19 CFR 115.40 - Technical requirements for containers.
Code of Federal Regulations, 2010 CFR
2010-04-01
...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for containers. 115.40...
19 CFR 115.40 - Technical requirements for containers.
Code of Federal Regulations, 2012 CFR
2012-04-01
...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for containers. 115.40...
19 CFR 115.40 - Technical requirements for containers.
Code of Federal Regulations, 2011 CFR
2011-04-01
...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for containers. 115.40...
19 CFR 115.40 - Technical requirements for containers.
Code of Federal Regulations, 2013 CFR
2013-04-01
...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for containers. 115.40...
19 CFR 115.40 - Technical requirements for containers.
Code of Federal Regulations, 2014 CFR
2014-04-01
...; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS... containers. A container that is submitted for inspection for approval after manufacture, must comply with the... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for containers. 115.40...
Power System Trade Studies for the Lunar Surface Access Module
NASA Technical Reports Server (NTRS)
Kohout, Lisa, L.
2008-01-01
A Lunar Lander Preparatory Study (LLPS) was undertaken for NASA's Lunar Lander Pre-Project in 2006 to explore a wide breadth of conceptual lunar lander designs. Civil servant teams from nearly every NASA center responded with dozens of innovative designs that addressed one or more specific lander technical challenges. Although none of the conceptual lander designs sought to solve every technical design issue, each added significantly to the technical database available to the Lunar Lander Project Office as it began operations in 2007. As part of the LLPS, a first order analysis was performed to identify candidate power systems for the ascent and descent stages of the Lunar Surface Access Module (LSAM). A power profile by mission phase was established based on LSAM subsystem power requirements. Using this power profile, battery and fuel cell systems were modeled to determine overall mass and volume. Fuel cell systems were chosen for both the descent and ascent stages due to their low mass. While fuel cells looked promising based on these initial results, several areas have been identified for further investigation in subsequent studies, including the identification and incorporation of peak power requirements into the analysis, refinement of the fuel cell models to improve fidelity and incorporate ongoing technology developments, and broadening the study to include solar power.
Uramatsu, Masashi; Fujisawa, Yoshikazu; Mizuno, Shinya; Souma, Takahiro; Komatsubara, Akinori; Miki, Tamotsu
2017-01-01
Objectives We sought to clarify how large a proportion of fatal medical accidents can be considered to be caused by poor non-technical skills, and to support development of a policy to reduce number of such accidents by making recommendations about possible training requirements. Design Summaries of reports of fatal medical accidents, published by the Japan Medical Safety Research Organization, were reviewed individually. Three experienced clinicians and one patient safety expert conducted the reviews to determine the cause of death. Views of the patient safety expert were given additional weight in the overall determination. Setting A total of 73 summary reports of fatal medical accidents were reviewed. These reports had been submitted by healthcare organisations across Japan to the Japan Medical Safety Research Organization between April 2010 and March 2013. Primary and secondary outcome measures The cause of death in fatal medical accidents, categorised into technical skills, non-technical skills and inevitable progress of disease were evaluated. Non-technical skills were further subdivided into situation awareness, decision making, communication, team working, leadership, managing stress and coping with fatigue. Results Overall, the cause of death was identified as non-technical skills in 34 cases (46.6%), disease progression in 33 cases (45.2%) and technical skills in two cases (5.5%). In two cases, no consensual determination could be achieved. Further categorisation of cases of non-technical skills were identified as 14 cases (41.2%) of problems with situation awareness, eight (23.5%) with team working and three (8.8%) with decision making. These three subcategories, or combinations of them, were identified as the cause of death in 33 cases (97.1%). Conclusions Poor non-technical skills were considered to be a significant cause of adverse events in nearly half of the fatal medical accidents examined. Improving non-technical skills may be effective for reducing accidents, and training in particular subcategories of non-technical skills may be especially relevant. PMID:28209605
Membrane Desalination: Where Are We, and What Can We Learn from Fundamentals?
Imbrogno, Joseph; Belfort, Georges
2016-06-07
Although thermal desalination technology provides potable water in arid regions (e.g., Israel and the Gulf), its relatively high cost has limited application to less arid regions with large populations (e.g., California). Energy-intensive distillation is currently being replaced with less costly pressure- and electrically driven membrane-based processes. Reverse osmosis (RO) is a preferred membrane technology owing to process and pre- and posttreatment improvements that have significantly reduced energy requirements and cost. Further technical advances will require a deeper understanding of the fundamental science underlying RO. This includes determining the mechanism for water selectivity; elucidating the behavior of molecular water near polar and apolar surfaces, as well as the advantages and limitations of hydrophobic versus hydrophilic pores; learning the rules of selective water transport from nature; and designing synthetic analogs for selective water transport. Molecular dynamics simulations supporting experiments will play an important role in advancing these efforts. Finally, future improvements in RO are limited by inherent technical mass transfer limitations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... technical data to be furnished to the Government with restrictions on use, reproduction or disclosure. 227..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-3 Early identification of technical data to be furnished to the Government with restrictions...
Code of Federal Regulations, 2014 CFR
2014-10-01
... technical data to be furnished to the Government with restrictions on use, reproduction or disclosure. 227..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-3 Early identification of technical data to be furnished to the Government with restrictions...
Code of Federal Regulations, 2012 CFR
2012-10-01
... technical data to be furnished to the Government with restrictions on use, reproduction or disclosure. 227..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-3 Early identification of technical data to be furnished to the Government with restrictions...
ERIC Educational Resources Information Center
Cary, Penny J.; Sweeney, Kevin F.
A study examined the need and demand for communication skills for employees in the technical fields for which Southern Maine Vocational Technical Institute offers programs of academic preparation. Two members of the Institute's English Department interviewed representatives of organizations that have hired technical program graduates. Further…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY...: HUD is seeking approval from the Office of Management and Budget (OMB) for the information collection... interested parties on the proposed collection of information. The purpose of this notice is to allow for 60...
High School Graduation Minimum Competency Requirements. Final Technical Report.
ERIC Educational Resources Information Center
Austin Independent School District, TX. Office of Research and Evaluation.
This technical report details the testing results and analyses supporting the evaluation findings related to the Austin (Texas) Independent School District (AISD) minimum competency graduation requirements. The graduation competency status of all AISD students in grades 8 to 12 are documented. The report provides additional information on the data…
Build It and They Will Come: Addressing the Problem of Declining Entry-Level Skills.
ERIC Educational Resources Information Center
Koontz, Paul
2000-01-01
The growing gap between the skills of the work force and the technical requirements of today's jobs have reemphasized the need to transform the educational system to provide the solid academic and technical skills required by the jobs of today and tomorrow. (Author)
Vocational-Technical Marine Career Opportunities in Texas.
ERIC Educational Resources Information Center
Hollin, Dewayne
Presented are background information and descriptions of jobs in various Texas marine industries, as well as a summary of the training required for particular positions. Since the emphasis is upon vocational-technical training for immediate job placement, most opportunities discussed require a high school diploma and some on-the-job education.…
A Technical Evaluation of the First Stage of the Mediterranean Regional Project.
ERIC Educational Resources Information Center
Hollister, Robinson
Objectives of this technical evaluation concerning the transfer of experience in the development of human resources were to develop educational plans based upon comprehensive estimates of manpower requirements and to evaluate the methods used in estimating manpower requirements for educational planning. The methodology involved estimates of the…
47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...
47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...
47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...
47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...
47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Compulsory Ships § 80.275 Technical Requirements for Class A Automatic Identification System (AIS) equipment. (a) Prior to submitting a certification application for a Class A AIS device, the following... Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... Ventilation System Surveillance Requirements To Operate for 10 Hours per Month,'' Using the Consolidated Line... currently require operating the ventilation system for at least 10 continuous hours with the heaters... Technical Specifications (TSs) Task Force (TSTF) Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Ventilation System Surveillance Requirements to Operate for 10 hours per Month.'' DATES: Comment period....1, which currently require operating the heaters in the respective systems for at least 10... Adoption of Technical Specifications Task Force Traveler TSTF-522, Revision 0, ``Revise Ventilation System...
77 FR 58301 - Technical Amendment; Airworthiness Standards: Aircraft Engines; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... technical amendment, the FAA clarified aircraft engine vibration test requirements in the airworthiness... amendment, the FAA intended to clarify vibration test requirements in Sec. 33.83 of 14 Code of Federal... read as follows: Sec. 33.83 Vibration test. (a) Each engine must undergo vibration surveys to establish...
47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...
47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...
47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...
77 FR 58871 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-24
... action to submit an information collection request to the Office of Management and Budget (OMB) and... ensuring that their vendors meet applicable regulations and requirements, both technical and quality, in..., the NRC inspects vendors to evaluate their conformance with technical and quality requirements in part...
47 CFR 15.509 - Technical requirements for ground penetrating radars and wall imaging systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Technical requirements for ground penetrating radars and wall imaging systems. 15.509 Section 15.509 Telecommunication FEDERAL COMMUNICATIONS... ground penetrating radars and wall imaging systems. (a) The UWB bandwidth of an imaging system operating...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0165] International Cooperation on Harmonisation of Technical Requirements for Registration of Veterinary Medicinal Products; Guidance for Industry on Studies To Evaluate the Metabolism and Residue Kinetics of Veterinary...
30 CFR 7.44 - Technical requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...
30 CFR 7.44 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Battery Assemblies § 7.44 Technical requirements. (a)(1) Battery boxes and covers constructed of AISI 1010 hot rolled steel shall have the following minimum thicknesses based on the total weight of a unit of the battery assembly charged and ready...
48 CFR 37.115-2 - General policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... degrade the level of technical expertise required to fulfill the Government's requirements (see 15.305 for competitive negotiations and 15.404-1(d) for cost realism analysis). When acquiring these services... skill levels and its use in key technical positions. [62 FR 44815, Aug. 22, 1997, as amended at 64 FR...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false System technical integration requiring uniform election of must-carry or retransmission consent status. 76.1608 Section 76.1608 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE...
75 FR 41433 - Trade Adjustment Assistance for Farmers
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
...-210). Individual asparagus producers, nationwide, interested in applying for technical training and..., producers may receive technical assistance provided at no cost and may receive cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance...
75 FR 41431 - Trade Adjustment Assistance for Farmers
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
.... 107-210). Individual catfish producers, nationwide, interested in applying for technical training and..., producers may receive technical assistance at no cost and may receive cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance under...
48 CFR 719.271-5 - Cognizant technical officers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-5 Cognizant technical officers. Since the procurement process starts with the establishment of a requirement, the actions of the cognizant technical officers can affect the opportunity of small business to participate equitably...
Luebker, Stephen A; Wojtkiewicz, Melinda; Koepsell, Scott A
2015-11-01
Formalin-fixed paraffin-embedded (FFPE) tissue is a rich source of clinically relevant material that can yield important translational biomarker discovery using proteomic analysis. Protocols for analyzing FFPE tissue by LC-MS/MS exist, but standardization of procedures and critical analysis of data quality is limited. This study compared and characterized data obtained from FFPE tissue using two methods: a urea in-solution digestion method (UISD) versus a commercially available Qproteome FFPE Tissue Kit method (Qkit). Each method was performed independently three times on serial sections of homogenous FFPE tissue to minimize pre-analytical variations and analyzed with three technical replicates by LC-MS/MS. Data were evaluated for reproducibility and physiochemical distribution, which highlighted differences in the ability of each method to identify proteins of different molecular weights and isoelectric points. Each method replicate resulted in a significant number of new protein identifications, and both methods identified significantly more proteins using three technical replicates as compared to only two. UISD was cheaper, required less time, and introduced significant protein modifications as compared to the Qkit method, which provided more precise and higher protein yields. These data highlight significant variability among method replicates and type of method used, despite minimizing pre-analytical variability. Utilization of only one method or too few replicates (both method and technical) may limit the subset of proteomic information obtained. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Advanced Simulation and Computing Fiscal Year 14 Implementation Plan, Rev. 0.5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meisner, Robert; McCoy, Michel; Archer, Bill
2013-09-11
The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities andmore » computational resources that support annual stockpile assessment and certification, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balanced resource, including technical staff, hardware, simulation software, and computer science solutions. In its first decade, the ASC strategy focused on demonstrating simulation capabilities of unprecedented scale in three spatial dimensions. In its second decade, ASC is now focused on increasing predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), quantify critical margins and uncertainties, and resolve increasingly difficult analyses needed for the SSP. Moreover, ASC’s business model is integrated and focused on requirements-driven products that address long-standing technical questions related to enhanced predictive capability in the simulation tools.« less
Stochastic techno-economic analysis of alcohol-to-jet fuel production.
Yao, Guolin; Staples, Mark D; Malina, Robert; Tyner, Wallace E
2017-01-01
Alcohol-to-jet (ATJ) is one of the technical feasible biofuel technologies. It produces jet fuel from sugary, starchy, and lignocellulosic biomass, such as sugarcane, corn grain, and switchgrass, via fermentation of sugars to ethanol or other alcohols. This study assesses the ATJ biofuel production pathway for these three biomass feedstocks, and advances existing techno-economic analyses of biofuels in three ways. First, we incorporate technical uncertainty for all by-products and co-products though statistical linkages between conversion efficiencies and input and output levels. Second, future price uncertainty is based on case-by-case time-series estimation, and a local sensitivity analysis is conducted with respect to each uncertain variable. Third, breakeven price distributions are developed to communicate the inherent uncertainty in breakeven price. This research also considers uncertainties in utility input requirements, fuel and by-product outputs, as well as price uncertainties for all major inputs, products, and co-products. All analyses are done from the perspective of a private firm. The stochastic dominance results of net present values (NPV) and breakeven price distributions show that sugarcane is the lowest cost feedstock over the entire range of uncertainty with the least risks, followed by corn grain and switchgrass, with the mean breakeven jet fuel prices being $0.96/L ($3.65/gal), $1.01/L ($3.84/gal), and $1.38/L ($5.21/gal), respectively. The variation of revenues from by-products in corn grain pathway can significantly impact its profitability. Sensitivity analyses show that technical uncertainty significantly impacts breakeven price and NPV distributions. Technical uncertainty is critical in determining the economic performance of the ATJ fuel pathway. Technical uncertainty needs to be considered in future economic analyses. The variation of revenues from by-products plays a significant role in profitability. With the distribution of breakeven prices, potential investors can apply whatever risk preferences they like to determine an appropriate bid or breakeven price that matches their risk profile.
General requirements to implement the personal dose equivalent Hp(10) in Brazil
NASA Astrophysics Data System (ADS)
Gomes Lopes, Amanda; Da Silva, Francisco Cesar Augusto
2018-03-01
To update the dosimetry quantity with the international community, Brazil is changing the Individual Dose (Hx) to the Personal Dose Equivalent Hp(10). A bibliographical survey on the technical and administrative requirements of nine countries that use Hp(10) was carried out to obtain the most relevant ones. All of them follow IEC and ISO guidelines for technical requirements, but administrative requirements change from country to country. Based on countries experiences, this paper presents a list of important general requirements to implement Hp(10) and to prepare the Brazilian requirements according to the international scientific community.
Sortie laboratory, phase B technical summary. [design and operational requirements
NASA Technical Reports Server (NTRS)
1973-01-01
The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.
Project Interface Requirements Process Including Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Bauch, Garland T.
2010-01-01
Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings
[Technical options of electrotherapy in patients with vasovagal syncope].
Bałczewska, Daria; Kaczmarek, Krzysztof; Ptaszyński, Paweł; Wranicz, Jerzy Krzysztof; Cygankiewicz, Iwona
2016-10-19
Syncope is a symptom of the disease with diverse etiology and can be evidence of both benign and very serious life-threatening conditions. Vasovagal syncope(VVS), with prevalence about 35% of the general population, is most frequent causes of transient loss of consciousness (T-LOC). Most cases of vasovagal syncope requires conservative treatment. Although cardioinhibitory type of VVS characterized by a significant bradycardia or pause of the heart rate and can be treated with continuous electrotherapy. This article discuss cardiac pacing and technical solutions for the treatment of VVS. Available cardiac pacing methods used to detect and break VVS such as Rate Drop Response (RDR), Closed Loop Stimulation (CLS) and rate response driven by variations of myocardial contractility like Peak Endocardial Acceleration (PEA), has been presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, D.W.; Heinrich, R.R.; Jensen, K.J.
The Analytical Chemistry Laboratory is a full-cost-recovery service center, with the primary mission of providing a broad range of technical support services to the scientific and engineering programs at ANL. In addition, ACL conducts a research program in analytical chemistry, works on instrumental and methods development, and provides analytical services for governmental, educational, and industrial organizations. The ACL handles a wide range of analytical problems, from routine standard analyses to unique problems that require significant development of methods and techniques. The purpose of this report is to summarize the technical and administrative activities of the Analytical Chemistry Laboratory (ACL) atmore » Argonne National Laboratory (ANL) for Fiscal Year 1985 (October 1984 through September 1985). This is the second annual report for the ACL. 4 figs., 1 tab.« less
14 CFR 1274.942 - Export licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... writing, that the Agreement Officer authorize it to export ITAR-controlled technical data (including... appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Recipient shall be responsible for obtaining...
Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hough, Gil; Fairless, Chad
Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for themore » development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)« less
Traceability of Software Safety Requirements in Legacy Safety Critical Systems
NASA Technical Reports Server (NTRS)
Hill, Janice L.
2007-01-01
How can traceability of software safety requirements be created for legacy safety critical systems? Requirements in safety standards are imposed most times during contract negotiations. On the other hand, there are instances where safety standards are levied on legacy safety critical systems, some of which may be considered for reuse for new applications. Safety standards often specify that software development documentation include process-oriented and technical safety requirements, and also require that system and software safety analyses are performed supporting technical safety requirements implementation. So what can be done if the requisite documents for establishing and maintaining safety requirements traceability are not available?
The Two-Year Colleges' Role in Building the Future Geoscience Technical Workforce
NASA Astrophysics Data System (ADS)
Wolfe, B.
2014-12-01
Careers in energy science related fields represent significant job growth in the U.S. Yet post-secondary career and technical programs have not kept pace with demand and energy science curriculum, including fundamental concepts of energy generation and environmental impact, lacks a firm position among general or career and technical education courses. Many of these emerging energy related jobs are skilled labor and entry level technical positions requiring less than a bachelor's degree. These include jobs such as solar/photovoltaic design and installation, solar water and space heating installation, energy management, efficiency and conservation auditor, environmental technician, etc. These energy related career pathways fit naturally within the geosciences discipline. Many of these jobs can be filled by individuals from HVAC, Industrial technology, welding, and electrical degree programs needing some additional specialized training and curriculum focused on fundamental concepts of energy, fossil fuel exploration and use, atmospheric pollution, energy generation, alternative energy sources, and energy conservation. Two-year colleges (2ycs) are uniquely positioned to train and fill these workforce needs as they already have existing career and technical programs and attract both recent high school graduates, as well as non-traditional students including displaced workers and returning veterans. We have established geoscience related workforce certificate programs that individuals completing the traditional industrial career and technical degrees can obtain to meet these emerging workforce needs. This presentation will discuss the role of geosciences programs at 2ycs in training these new workers, developing curriculum, and building a career/technical program that is on the forefront of this evolving industry.
RELEASE OF DRIED RADIOACTIVE WASTE MATERIALS TECHNICAL BASIS DOCUMENT
DOE Office of Scientific and Technical Information (OSTI.GOV)
KOZLOWSKI, S.D.
2007-05-30
This technical basis document was developed to support RPP-23429, Preliminary Documented Safety Analysis for the Demonstration Bulk Vitrification System (PDSA) and RPP-23479, Preliminary Documented Safety Analysis for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Facility. The main document describes the risk binning process and the technical basis for assigning risk bins to the representative accidents involving the release of dried radioactive waste materials from the Demonstration Bulk Vitrification System (DBVS) and to the associated represented hazardous conditions. Appendices D through F provide the technical basis for assigning risk bins to the representative dried waste release accident and associated represented hazardous conditionsmore » for the Contact-Handled Transuranic Mixed (CH-TRUM) Waste Packaging Unit (WPU). The risk binning process uses an evaluation of the frequency and consequence of a given representative accident or represented hazardous condition to determine the need for safety structures, systems, and components (SSC) and technical safety requirement (TSR)-level controls. A representative accident or a represented hazardous condition is assigned to a risk bin based on the potential radiological and toxicological consequences to the public and the collocated worker. Note that the risk binning process is not applied to facility workers because credible hazardous conditions with the potential for significant facility worker consequences are considered for safety-significant SSCs and/or TSR-level controls regardless of their estimated frequency. The controls for protection of the facility workers are described in RPP-23429 and RPP-23479. Determination of the need for safety-class SSCs was performed in accordance with DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses, as described below.« less
Seismic assessment of Technical Area V (TA-V).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Medrano, Carlos S.
The Technical Area V (TA-V) Seismic Assessment Report was commissioned as part of Sandia National Laboratories (SNL) Self Assessment Requirement per DOE O 414.1, Quality Assurance, for seismic impact on existing facilities at Technical Area-V (TA-V). SNL TA-V facilities are located on an existing Uniform Building Code (UBC) Seismic Zone IIB Site within the physical boundary of the Kirtland Air Force Base (KAFB). The document delineates a summary of the existing facilities with their safety-significant structure, system and components, identifies DOE Guidance, conceptual framework, past assessments and the present Geological and Seismic conditions. Building upon the past information and themore » evolution of the new seismic design criteria, the document discusses the potential impact of the new standards and provides recommendations based upon the current International Building Code (IBC) per DOE O 420.1B, Facility Safety and DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE Nuclear Facilities and Non-Nuclear Facilities.« less
Technical and Economic Assessment of Span-Loaded Cargo Aircraft Concepts
NASA Technical Reports Server (NTRS)
1976-01-01
The benefits are assessed of span distributed loading concepts as applied to future commercial air cargo operations. A two phased program is used to perform this assessment. The first phase consists of selected parametric studies to define significant configuration, performance, and economic trends. The second phase consists of more detailed engineering design, analysis, and economic evaluations to define the technical and economic feasibility of a selected spanloader design. A conventional all-cargo aircraft of comparable technology and size is used as a comparator system. The technical feasibility is demonstrated of the spanloader concept with no new major technology efforts required to implement the system. However, certain high pay-off technologies such as winglets, airfoil design, and advanced structural materials and manufacturing techniques need refinement and definition prior to application. In addition, further structural design analysis could establish the techniques and criteria necessary to fully capitalize upon the high degree of structural commonality and simplicity inherent in the spanloader concept.
An adequate level of training for technically competent colonoscopic polypectomy.
Boo, Sun-Jin; Jung, Ji Hoon; Park, Jae Ho; Na, Soo-Young; Kim, Seon Ok; Park, Sang Hyoung; Yang, Dong-Hoon; Kim, Kyung-Jo; Ye, Byong Duk; Myung, Seung-Jae; Yang, Suk-Kyun; Kim, Jin-Ho; Byeon, Jeong-Sik
2015-07-01
The purpose of this study is to investigate the learning curve for colonoscopic polypectomy (CP) by trainee endoscopists. The amount of training required to achieve technical competence for CP is uncertain. The CP times and en bloc resection rates of three experienced colonoscopists were obtained from 240 procedures. These data were compared to those of three gastroenterology trainees who performed 750 CP procedures. A trainee procedure was deemed to be a success if en bloc resection was obtained and the CP time was within twice the median CP time of the experienced colonoscopists. Trainees were deemed to be technically competent when they achieved a CP success rate of greater than or equal to 80%. The median CP times and en bloc resection rates for the experienced colonoscopists and trainees were 79 s (range, 20-301 s) and 99.6% (239/240), and 118 s (range, 36-1051 s) and 95.6% (717/750), respectively. The trainee success rate of CP was 72% (540/750). The success rate of the procedure was associated with increased trainee experience (p = 0.003) and reached 80% after 250 procedures. The CP time significantly decreased (p < 0.001) and en bloc resection rate significantly increased (p = 0.011) as trainee experience accumulated. The level of experience was an independent predictor for successful CP. The achievement of technical competence with CP was associated with an accumulation of approximately 250 procedures. These findings suggest that dedicated education and training programs for CP are warranted.
21 CFR 14.80 - Qualifications for members of standing policy and technical advisory committees.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., and experience; specific technical expertise is not a requirement; (2) Are subject to the conflict of...), are subject to the conflict of interest laws and regulations either as special Government employees or... involved is not a requirement; and (ii) May be special Government employees subject to the conflict of...
47 CFR 80.275 - Technical Requirements for Class A Automatic Identification System (AIS) equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Technical Requirements for Class A Automatic Identification System (AIS) equipment. 80.275 Section 80.275 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Equipment Authorization for Compulsory Ships § 80.275...
An Australian Study of Generic Competencies Required by Engineers
ERIC Educational Resources Information Center
Male, S. A.; Bush, M. B.; Chapman, E. S.
2011-01-01
Engineering curricula have expanded in recent decades. In addition to science and technical engineering, they now include several non-technical competencies. This is a trend reinforced by programme accreditation. The authors take the viewpoint that it is important to ensure that graduates have the competencies they will require for their work. The…
NASA Technical Reports Server (NTRS)
2005-01-01
This document provides a study of the technical literature related to Command and Control (C2) link security for Unmanned Aircraft Systems (UAS) for operation in the National Airspace System (NAS). Included is a preliminary set of functional requirements for C2 link security.
Influence of End Customer Exposure on Product Design within an Epistemic Game Environment
ERIC Educational Resources Information Center
Markovetz, Matthew R.; Clark, Renee M.; Swiecki, Zachari; Irgens, Golnaz Arastoopour; Chesler, Naomi C.; Shaffer, David W.; Bodnar, Cheryl A.
2017-01-01
Engineering product design requires both technical aptitude and an understanding of the nontechnical requirements in the marketplace, economic or otherwise. Engineering education has long focused on the technical side of product design, but there is increasing demand for market-aware engineers in industry. Market-awareness and customer-focus are…
Lessons Learned from Highly Implemented Programs of Study
ERIC Educational Resources Information Center
Stipanovic, Natalie; Shumer, Rob; Stringfield, Sam
2012-01-01
American businesses and industries have long identified shortages in key career and technical areas--some of these areas require two- or four-year college degrees, whereas others simply require industry certifications. Career and technical education (CTE) has the potential to play a central role in filling these gaps. The current Carl D. Perkins…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... writing that it wishes to accept the designation. The final rule extends an FCU's response time from 30..., nonsubstantive technical amendments to NCUA's requirements for insurance regulation to reflect current agency... requirements for insurance regulation. These technical corrections are necessary to reflect current agency...
10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2010 CFR
2010-01-01
... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...
19 CFR 115.65 - Technical requirements for road vehicles by design type.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 19 Customs Duties 1 2012-04-01 2012-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...
19 CFR 115.65 - Technical requirements for road vehicles by design type.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 19 Customs Duties 1 2011-04-01 2011-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...
19 CFR 115.65 - Technical requirements for road vehicles by design type.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 19 Customs Duties 1 2013-04-01 2013-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...
19 CFR 115.65 - Technical requirements for road vehicles by design type.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 19 Customs Duties 1 2014-04-01 2014-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...
19 CFR 115.65 - Technical requirements for road vehicles by design type.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 1 2010-04-01 2010-04-01 false Technical requirements for road vehicles by design type. 115.65 Section 115.65 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO...
30 CFR 7.84 - Technical requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...
30 CFR 7.84 - Technical requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...
30 CFR 7.84 - Technical requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...
30 CFR 7.84 - Technical requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...
30 CFR 7.84 - Technical requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Underground Coal Mines § 7.84 Technical requirements. (a) Fuel injection adjustment. The fuel injection system of the engine shall be constructed so that the quantity of fuel injected can be controlled at a... design. (b) Maximum fuel-air ratio. At the maximum fuel-air ratio determined by § 7.87 of this part, the...
Learning Styles of ICT Specialisation Students: Do Differences in Disciplines Exist?
ERIC Educational Resources Information Center
de Salas, Kristy; Lewis, Ian; Dermoudy, Julian
2014-01-01
Within existing ICT degrees there is a widely-held belief that content must be tailored for different "kinds" of students--often two differing student groups: a technical group requiring detailed Computer Science knowledge and a separate group requiring less technical, more strategic ICT knowledge and skills. Our institution has produced…
10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2013 CFR
2013-01-01
... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...
10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2011 CFR
2011-01-01
... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...
10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2014 CFR
2014-01-01
... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...
10 CFR 35.2647 - Records of additional technical requirements for mobile remote afterloader units.
Code of Federal Regulations, 2012 CFR
2012-01-01
... remote afterloader units. 35.2647 Section 35.2647 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Records § 35.2647 Records of additional technical requirements for mobile remote afterloader units. (a) A licensee shall retain a record of each check for mobile remote afterloader units...
Outcome of peroral endoscopic myotomy in achalasia cardia: Experience with a new triangular knife.
Nabi, Zaheer; Ramchandani, Mohan; Chavan, Radhika; Kalapala, Rakesh; Darisetty, Santosh; Reddy, D Nageshwar
2018-01-01
Peroral endoscopic myotomy (POEM) is a technically demanding procedure. Recently, a new triangular knife with integrated water jet function (TTJ) has been introduced. The present study was aimed to analyze and compare the operating time, efficacy, and adverse events (AEs) between the conventional (TT knife) and new knife (TTJ). All patients with achalasia cardia (AC) who underwent POEM between August 2015 and November 2016 were analyzed retrospectively. Operating time (OT), technical success, and AEs were assessed and compared between TT and TTJ knife. A total of 193 patients with AC underwent POEM during the specified period. Both groups had equivalent number of different subtypes of AC (I, II, and III). There was no difference in technical success between the two groups (TT, 99% vs TT, 98.9%). OT was significantly less in the TTJ group as compared to TT group (53.8 ± 15.2 vs 66.26 ± 19.2; P = 0.0001). On subanalysis, OT taken for submucosal tunneling was significantly less with TTJ knife (34.6 ± 10.1 vs 45.83 ± 14.80), whereas OT was similar for myotomy and clipping in both the groups. Significantly fewer use of coagulation forceps and exchanges of accessories were required in TTJ knife group (2.92 ± 1.77 vs 10.5 ± 3.58; P = 0.0001). There were no major AEs. Minor AEs were noted in 21.5% and 31% of patients in TTJ and TT knife groups, respectively. New triangular knife reduces procedure time and technical difficulty with POEM. POEM is an efficacious treatment for achalasia and can be safely executed in an endoscopy unit.
Outcome of peroral endoscopic myotomy in achalasia cardia: Experience with a new triangular knife
Nabi, Zaheer; Ramchandani, Mohan; Chavan, Radhika; Kalapala, Rakesh; Darisetty, Santosh; Reddy, D. Nageshwar
2018-01-01
Background and Aim: Peroral endoscopic myotomy (POEM) is a technically demanding procedure. Recently, a new triangular knife with integrated water jet function (TTJ) has been introduced. The present study was aimed to analyze and compare the operating time, efficacy, and adverse events (AEs) between the conventional (TT knife) and new knife (TTJ). Patients and Methods: All patients with achalasia cardia (AC) who underwent POEM between August 2015 and November 2016 were analyzed retrospectively. Operating time (OT), technical success, and AEs were assessed and compared between TT and TTJ knife. Results: A total of 193 patients with AC underwent POEM during the specified period. Both groups had equivalent number of different subtypes of AC (I, II, and III). There was no difference in technical success between the two groups (TT, 99% vs TT, 98.9%). OT was significantly less in the TTJ group as compared to TT group (53.8 ± 15.2 vs 66.26 ± 19.2; P = 0.0001). On subanalysis, OT taken for submucosal tunneling was significantly less with TTJ knife (34.6 ± 10.1 vs 45.83 ± 14.80), whereas OT was similar for myotomy and clipping in both the groups. Significantly fewer use of coagulation forceps and exchanges of accessories were required in TTJ knife group (2.92 ± 1.77 vs 10.5 ± 3.58; P = 0.0001). There were no major AEs. Minor AEs were noted in 21.5% and 31% of patients in TTJ and TT knife groups, respectively. Conclusion: New triangular knife reduces procedure time and technical difficulty with POEM. POEM is an efficacious treatment for achalasia and can be safely executed in an endoscopy unit. PMID:29451180
Vidranski, Tihomir; Sertić, Hrvoje; Jukić, Josefina
2015-07-01
The purpose of this research was to identify the fighters' technical and tactical activity indicators in order to determine indicator significance regarding situational efficiency and designation between winning and losing performances in a karate match. We scientifically observed a sample of 274 male contesters of 137 karate matches during the 2008 World Karate Championship in Tokyo. Each individual competitor was observed in maximum of three matches. The matches were recorded using a DVD camera in order to collect data for further analysis, and the sample was further described using 48 technical and tactical indicators of situational efficiency and match outcome variables. The obtained results indicate that a karate match is composed of 91% of non-scoring techniques and 9% of scoring techniques in the total technique frequency. On this basis a significant difference in the situational efficiency between the match winners and the losing contesters has been discovered. Those two groups of fighters exhibit a statistically significant difference (p<0.05) in 11 out of 21 observed variables of situational efficiency in the table of derived situational indicators. A prevalence of non-scoring techniques suggests that energy demand and technical and tactical requirements of a karate match are in the largest extent defined by non-scoring techniques. Therefore, it would be a grave mistake to disregard non-scoring karate techniques in any future situational efficiency studies. It has been discovered that the winners differ from the defeated contesters by a higher level of situational efficiency in their executed techniques, which incorporate versatility, biomechanical and structural complexity, topological diversity and a specific tactical concept of technique use in the attack phase.
75 FR 62760 - Trade Adjustment Assistance for Farmers
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-13
... assistance in FY 2011. Eligible individual blueberry producers in Maine may apply for technical training and..., producers may receive technical assistance at no cost and cash benefits, if the applicable program eligibility requirements are satisfied. Applicants must complete the technical assistance training under the...
Energy Technology Training Conference Proceedings (Atlanta, Georgia, October 27-29, 1976).
ERIC Educational Resources Information Center
Oak Ridge Associated Universities, TN.
Conference goals included identifying projected technical manpower needs and skill mix requirements, potential obstacles to developing an adequate technical education base, and stimulating education, industry, and labor cooperation in technical program development and federal interagency coordination and cooperation. Findings of the conference…
48 CFR 1852.225-70 - Export Licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...
30 CFR 700.12 - Petitions to initiate rulemaking.
Code of Federal Regulations, 2010 CFR
2010-07-01
... statement of the facts, technical justification, and law which require issuance, amendment, or repeal of a... of the petition, the Director shall determine if the petition sets forth facts, technical.... Facts, technical justification or law previously considered in a petition or rulemaking on the same...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
... (Technical Industry Standards) Activity: Comment Request AGENCY: Office of Acquisition and Logistics... Industry Standards. OMB Control Number: 2900-0586. Type of Review: Extension of a currently approved collection. Abstract: VAAR provision 852.211-75, Technical Industry Standards, requires items offered for...
48 CFR 207.106 - Additional requirements for major systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...
48 CFR 207.106 - Additional requirements for major systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...
48 CFR 207.106 - Additional requirements for major systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...
48 CFR 207.106 - Additional requirements for major systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...
48 CFR 207.106 - Additional requirements for major systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of complete technical data packages. (viii) Periodic competitions for subsystem upgrades. (ix... Government to use technical data to competitively reprocure identical items or components of the system if... otherwise entitled to unlimited rights in technical data. (B) If the contracting officer makes a...
DOE standard: The Department of Energy Laboratory Accreditation Program for radiobioassay
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
This technical standard describes the US Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the US Department of Energy (DOE) and DOE Contractor radiobioassay programs. This standard is intended to be used in conjunction with the general administrative technical standard that describes the overall DOELAP accreditation process--DOE-STD-1111-98, Department of Energy Laboratory Accreditation Program Administration. This technical standard pertains to radiobioassay service laboratories that provide either direct or indirect (in vivo or in vitro) radiobioassay measurements in support of internal dosimetry programs at DOE facilities or for DOE and DOE contractors. Similar technical standards have been developedmore » for other DOELAP dosimetry programs. This program consists of providing an accreditation to DOE radiobioassay programs based on successful completion of a performance-testing process and an on-site evaluation by technical experts. This standard describes the technical requirements and processes specific to the DOELAP Radiobioassay Accreditation Program as required by 10 CFR 835 and as specified generically in DOE-STD-1111-98.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.
The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less
Spectrum orbit utilization program technical manual SOUP5 Version 3.8
NASA Technical Reports Server (NTRS)
Davidson, J.; Ottey, H. R.; Sawitz, P.; Zusman, F. S.
1984-01-01
The underlying engineering and mathematical models as well as the computational methods used by the SOUP5 analysis programs, which are part of the R2BCSAT-83 Broadcast Satellite Computational System, are described. Included are the algorithms used to calculate the technical parameters and references to the relevant technical literature. The system provides the following capabilities: requirements file maintenance, data base maintenance, elliptical satellite beam fitting to service areas, plan synthesis from specified requirements, plan analysis, and report generation/query. Each of these functions are briefly described.
3D-printed tracheoesophageal puncture and prosthesis placement simulator.
Barber, Samuel R; Kozin, Elliott D; Naunheim, Matthew R; Sethi, Rosh; Remenschneider, Aaron K; Deschler, Daniel G
A tracheoesophageal prosthesis (TEP) allows for speech after total laryngectomy. However, TEP placement is technically challenging, requiring a coordinated series of steps. Surgical simulators improve technical skills and reduce operative time. We hypothesize that a reusable 3-dimensional (3D)-printed TEP simulator will facilitate comprehension and rehearsal prior to actual procedures. The simulator was designed using Fusion360 (Autodesk, San Rafael, CA). Components were 3D-printed in-house using an Ultimaker 2+ (Ultimaker, Netherlands). Squid simulated the common tracheoesophageal wall. A Blom-Singer TEP (InHealth Technologies, Carpinteria, CA) replicated placement. Subjects watched an instructional video and completed pre- and post-simulation surveys. The simulator comprised 3D-printed parts: the esophageal lumen and superficial stoma. Squid was placed between components. Ten trainees participated. Significant differences existed between junior and senior residents with surveys regarding anatomy knowledge(p<0.05), technical details(p<0.01), and equipment setup(p<0.01). Subjects agreed that simulation felt accurate, and rehearsal raised confidence in future procedures. A 3D-printed TEP simulator is feasible for surgical training. Simulation involving multiple steps may accelerate technical skills and improve education. Copyright © 2017 Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Adamkiewicz, Andrzej; Zeńczak, Wojciech
2017-03-01
Heavy oils (HFO fuels) used on ships play a part in degradation of technical condition of heat exchange surfaces of utilization boilers especially on the exhaust gas side. Presence of sulphur in these fuels is the main factor favouring degradation. The upper limit for sulphur content in the fuel used outside the SECA areas equal to 3.5% is currently in force, at least until the year 2020 or 2025. The recommended by classification societies overhauls of utilization boilers are, therefore characterized by a specially chosen strategy thanks to which it is possible to maintain their appropriate technical condition. The requirement to use fuels with low sulphur content (LSFO), which are significantly more expensive than MDO fuels, in the areas of controlled sulphur emissions also led to a further introduction of alternative fuels, such as methanol and above all liquefied natural gas (LNG), onto ships. That is especially valid for the ship owners whose vessels e.g. ferries sail mainly within SCECA This article analyses the consequences of the introduced fuel change on utilization boiler maintenance. A change in the technical condition maintenance strategy for utilization boilers has been suggested.
Preparation of composite materials in space. Volume 2: Technical report
NASA Technical Reports Server (NTRS)
Steurer, W. H.; Kaye, S.
1973-01-01
A study to define promising materials, significant processing criteria, and the related processing techniques and apparatus for the preparation of composite materials in space was conducted. The study also established a program for zero gravity experiments and the required developmental efforts. The following composite types were considered: (1) metal-base fiber and particle composites, including cemented compacts, (2) controlled density metals, comprising plain and reinforced metal foams, and (3) unidirectionally solidified eutectic alloys. A program of suborbital and orbital experiments for the 1972 to 1978 time period was established to identify materials, processes, and required experiment equipment.
NASA Astrophysics Data System (ADS)
Ahmad, Sabrina; Jalil, Intan Ermahani A.; Ahmad, Sharifah Sakinah Syed
2016-08-01
It is seldom technical issues which impede the process of eliciting software requirements. The involvement of multiple stakeholders usually leads to conflicts and therefore the need of conflict detection and resolution effort is crucial. This paper presents a conceptual model to further improve current efforts. Hence, this paper forwards an improved conceptual model to assist the conflict detection and resolution effort which extends the model ability and improves overall performance. The significant of the new model is to empower the automation of conflicts detection and its severity level with rule-based reasoning.
Space station pressurized laboratory safety guidelines
NASA Technical Reports Server (NTRS)
Mcgonigal, Les
1990-01-01
Before technical safety guidelines and requirements are established, a common understanding of their origin and importance must be shared between Space Station Program Management, the User Community, and the Safety organizations involved. Safety guidelines and requirements are driven by the nature of the experiments, and the degree of crew interaction. Hazard identification; development of technical safety requirements; operating procedures and constraints; provision of training and education; conduct of reviews and evaluations; and emergency preplanning are briefly discussed.
Improved self-contained breathing apparatus concept. Final report Oct 80-Jun 82
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, L.; Walker, J.
1982-08-01
Past operational experiences of USAF fire fighting and rescue teams have indicated the need for an improved self-contained breathing apparatus (SCBA). In October 1980, a contract was awarded to Electronic Data Systems, Panama City, Florida, to design and develop a prototype SCBA that would meet Air Force technical requirements. A prototype was designed, developed, and tested through a subcontract with Reimers Consultants, Falls Church, Virginia. This report describes the technical requirements, a detailed technical description of the unit, and the unmanned test procedures and results. The unmanned testing demonstrate that the prototype SCBA meets all performance requirements, except for weight.more » The fully charged prototype weights 34 pounds, the maximum acceptable weight is 30 pounds. With the other performance requirements either met or exceeded, manned testing of the SCBA can proceed.« less
Marketing medical devices in Japan.
Ohashi, J
1998-01-01
The control of medical devices in Japan has recently undergone significant changes as the country brings its systems into line with those of the United States and Europe. This article discusses pre-market approval, quality system requirements and post-market surveillance. Many technical issues have been harmonized but language is likely to continue to be a barrier to trade. Details of information services that are available to foreign manufacturers and importers are supplied.
Nuclear thermal propulsion transportation systems for lunar/Mars exploration
NASA Technical Reports Server (NTRS)
Clark, John S.; Borowski, Stanley K.; Mcilwain, Melvin C.; Pellaccio, Dennis G.
1992-01-01
Nuclear thermal propulsion technology development is underway at NASA and DoE for Space Exploration Initiative (SEI) missions to Mars, with initial near-earth flights to validate flight readiness. Several reactor concepts are being considered for these missions, and important selection criteria will be evaluated before final selection of a system. These criteria include: safety and reliability, technical risk, cost, and performance, in that order. Of the concepts evaluated to date, the Nuclear Engine for Rocket Vehicle Applications (NERVA) derivative (NDR) is the only concept that has demonstrated full power, life, and performance in actual reactor tests. Other concepts will require significant design work and must demonstrate proof-of-concept. Technical risk, and hence, development cost should therefore be lowest for the concept, and the NDR concept is currently being considered for the initial SEI missions. As lighter weight, higher performance systems are developed and validated, including appropriate safety and astronaut-rating requirements, they will be considered to support future SEI application. A space transportation system using a modular nuclear thermal rocket (NTR) system for lunar and Mars missions is expected to result in significant life cycle cost savings. Finally, several key issues remain for NTR's, including public acceptance and operational issues. Nonetheless, NTR's are believed to be the 'next generation' of space propulsion systems - the key to space exploration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, Ryan M.; Coble, Jamie B.; Hirt, Evelyn H.
2013-05-17
This report identifies a number of requirements for prognostics health management of passive systems in AdvSMRs, documents technical gaps in establishing a prototypical prognostic methodology for this purpose, and describes a preliminary research plan for addressing these technical gaps. AdvSMRs span multiple concepts; therefore a technology- and design-neutral approach is taken, with the focus being on characteristics that are likely to be common to all or several AdvSMR concepts. An evaluation of available literature is used to identify proposed concepts for AdvSMRs along with likely operational characteristics. Available operating experience of advanced reactors is used in identifying passive components thatmore » may be subject to degradation, materials likely to be used for these components, and potential modes of degradation of these components. This information helps in assessing measurement needs for PHM systems, as well as defining functional requirements of PHM systems. An assessment of current state-of-the-art approaches to measurements, sensors and instrumentation, diagnostics and prognostics is also documented. This state-of-the-art evaluation, combined with the requirements, may be used to identify technical gaps and research needs in the development, evaluation, and deployment of PHM systems for AdvSMRs. A preliminary research plan to address high-priority research needs for the deployment of PHM systems to AdvSMRs is described, with the objective being the demonstration of prototypic prognostics technology for passive components in AdvSMRs. Greater efficiency in achieving this objective can be gained through judicious selection of materials and degradation modes that are relevant to proposed AdvSMR concepts, and for which significant knowledge already exists. These selections were made based on multiple constraints including the analysis performed in this document, ready access to laboratory-scale facilities for materials testing and measurement, and potential synergies with other national laboratory and university partners.« less
25 CFR 23.42 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Technical assistance. 23.42 Section 23.42 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR HUMAN SERVICES INDIAN CHILD WELFARE ACT General and Uniform Grant Administration Provisions and Requirements § 23.42 Technical assistance. (a) Pre-award and...
How Engineers Perceive the Importance of Ethics in Finland
ERIC Educational Resources Information Center
Taajamaa, Ville; Majanoja, Anne-Maarit; Bairaktarova, Diana; Airola, Antti; Pahikkala, Tapio; Sutinen, Erkki
2018-01-01
Success in complex and holistic engineering practices requires more than problem-solving abilities and technical competencies. Engineering education must offer proficient technical competences and also train engineers to think and act ethically. A technical "engineering-like" focus and demand have made educators and students overlook the…
48 CFR 227.7103-9 - Copyright.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-9 Copyright. (a) Copyright license. (1) The clause at 252.227-7013, Rights in Technical Data... obtained under the clause. When non-standard license rights in technical data will be negotiated, negotiate...
48 CFR 227.7103-6 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7103-6 Contract clauses. (a) Use the clause at 252.227-7013, Rights in Technical Data... technical data to the Government. Do not use the clause when the only deliverable items are computer...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... (Technical Industry Standards) Activities Under OMB Review AGENCY: Office of Acquisition and Logistics... Industry Standards. OMB Control Number: 2900-0586. Type of Review: Extension of a currently approved collection. Abstract: VAAR provision 852.211-75, Technical Industry Standards, requires that items offered...
ERIC Educational Resources Information Center
MILLER, AARON J.
A SELECT GROUP OF PARTICIPANTS REPRESENTING NATIONAL LEADERSHIP IN BUSINESS, INDUSTRY, RESEARCH, GOVERNMENT, AND EDUCATION MET TO IDENTIFY SOME OF THE MOST OBVIOUS NEW EMERGING TECHNICAL OCCUPATIONS WHICH MIGHT REQUIRE RESEARCH AND DEVELOPMENT EFFORTS AND SOME OF THE MOST PRESSING RESEARCHABLE PROBLEM AREAS IN TECHNICAL EDUCATION. THE NEW OR…
ERLN Technical Support for Labs
The Environmental Response Laboratory Network provides policies and guidance on lab and data requirements, Standardized Analytical Methods, and technical support for water and radiological sampling and analysis
Technical aspects and limitations of fractional flow reserve measurement.
Jerabek, Stepan; Kovarnik, Tomas
2018-02-27
The only indication for coronary revascularization is elimination of ischaemia. Invasive hemodynamic methods (fractional flow reserve - FFR and instantaneous wave-free ratio (iFR) are superior to coronary angiography in detection of lesions causing myocardial ischaemia. Current European guidelines for myocardial revascularization recommend using of FFR for detection of functional assessment of lesions severity in category IA and number of these procedures increases. However, routine usage of these methods requires knowledge of technical requirements and limitations. The aim of the study is to summarise good clinical practice for FFR and iFR measurements with explanation of possible technical challenges, that are necessary for increasing of measurement accuracy. Authors describe frequent technical mistakes and malpractice during invasive assessment of lesion severity in coronary arteries.
Minimally Invasive Implantable Fetal Micropacemaker: Mechanical Testing and Technical Refinements
Zhou, Li; Vest, Adriana N.; Peck, Raymond A.; Sredl, Jonathan P.; Huang, Xuechen; Bar-Cohen, Yaniv; Silka, Michael J.; Pruetz, Jay D.; Chmait, Ramen H.; Loeb, Gerald E.
2016-01-01
This paper discusses the technical and safety requirements for cardiac pacing of a human fetus with heart failure and hydrops fetalis secondary to complete heart block. Engineering strategies to meet specific technical requirements were integrated into a systematic design and implementation consisting of a novel fetal micropacemaker, a percutaneous implantation system, and a sterile package that enables device storage and recharging maintenance in a clinical setting. We further analyzed observed problems on myocardial fixation and pacing lead fatigue previously reported in earlier preclinical trials. This paper describes the technical refinements of the implantable fetal micropacemaker to overcome these challenges. The mechanical performance has been extensively tested to verify the improvement of reliability and safety margins of the implantation system. PMID:27021067
Application of fiber-reinforced bismaleimide materials to aircraft nacelle structures
NASA Technical Reports Server (NTRS)
Peros, Vasilios; Ruth, John; Trawinski, David
1992-01-01
Existing aircraft engine nacelle structures employ advanced composite materials to reduce weight and thereby increase overall performance. Use of advanced composite materials on existing aircraft nacelle structures includes fiber-reinforced epoxy structures and has typically been limited to regions furthest away from the hot engine core. Portions of the nacelle structure that are closer to the engine require materials with a higher temperature capability. In these portions, existing nacelle structures employ aluminum sandwich construction and skin/stringer construction. The aluminum structure is composed of many detail parts and assemblies and is usually protected by some form of ablative, insulator, or metallic thermal shield. A one-piece composite inner cowl for a new-generation engine nacelle structure has been designed using fiber-reinforced bismaleimide (BMI) materials and honeycomb core in a sandwich construction. The new composite design has many advantages over the existing aluminum structure. Multiple details were integrated into the one-piece composite design, thereby significantly reducing the number of detail parts and fasteners. The use of lightweight materials and the reduction of the number of joints result in a significant weight reduction over the aluminum design; manufacturing labor and the overall number of tools required have also been reduced. Several significant technical issues were addressed in the development of a BMI composite design. Technical evaluation of the available BMI systems led to the selection of a toughened BMI material which was resistant to microcracking under thermal cyclic loading and enhanced the damage tolerance of the structure. Technical evaluation of the degradation of BMI materials in contact with aluminum and other metals validated methods for isolation of the various materials. Graphite-reinforced BMI in contact with aluminum and some steels was found to degrade in salt spray testing. Isolation techniques such as those used for graphite-reinforced epoxy structures were shown to provide adequate protection. The springback and producibility of large BMI structures were evaluated by manufacturing prototype hardware which had the full-scale cross section of the one-piece composite structure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
1994-07-18
09 Software Product Training 3 .4 .11 Physical Cues Segment Development3 .01 Technical Management .02 SW Requirements Analysis .03 Preliminary Design...Mission Planning Subsystem Development3 .01 Technical Management .02 SW Requirements Analysis .03 Preliminary Design - .04 Detailed Design .05 Code & CSU
Code of Federal Regulations, 2012 CFR
2012-01-01
... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...
Code of Federal Regulations, 2014 CFR
2014-01-01
... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...
Code of Federal Regulations, 2010 CFR
2010-01-01
... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...
Code of Federal Regulations, 2011 CFR
2011-01-01
... fixtures. Do not place insulation over such fixtures so as to entrap heat. Also keep this insulation away... SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS CELLULOSE INSULATION § 1404.4 Requirements to... insulation shall give notification of performance and technical data related to performance and safety (1) to...
49 CFR 171.24 - Additional requirements for the use of the ICAO Technical Instructions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Additional requirements for the use of the ICAO... the United States by aircraft, and by motor vehicle or rail either before or after being transported by aircraft in accordance with the ICAO Technical Instructions (IBR, see § 171.7), as authorized in...
ERIC Educational Resources Information Center
United Nations Industrial Development Organization, Vienna (Austria).
The need to develop managerial and technical personnel in the cement, fertilizer, pulp and paper, sugar, leather and shoe, glass, and metal processing industries of various nations was studied, with emphasis on necessary steps in developing nations to relate occupational requirements to technology, processes, and scale of output. Estimates were…
50 CFR 91.13 - Technical requirements for design and submission of entry.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Technical requirements for design and submission of entry. 91.13 Section 91.13 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MISCELLANEOUS PROVISIONS MIGRATORY BIRD HUNTING AND CONSERVATION STAMP CONTEST Procedures for Entering the...
50 CFR 91.13 - Technical requirements for design and submission of entry.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Technical requirements for design and submission of entry. 91.13 Section 91.13 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) MISCELLANEOUS PROVISIONS MIGRATORY BIRD HUNTING AND CONSERVATION STAMP CONTEST Procedures for Entering the...
ERIC Educational Resources Information Center
Gragson, Derek E.; Hagen, John P.
2010-01-01
Writing formal "journal-style" lab reports is often one of the requirements chemistry and biochemistry students encounter in the physical chemistry laboratory. Helping students improve their technical writing skills is the primary reason this type of writing is a requirement in the physical chemistry laboratory. Developing these skills is an…
The Uses and Misuses of Test Scores: Technical Assistance Perspective.
ERIC Educational Resources Information Center
Echternacht, Gary
The uses and misuses of standardized test results used for program evaluation as seen by a staff member of an Elementary Secondary Education Act (ESEA) Title I Technical Assistance Center are described. In ESEA Title I, test scores are used to select students for the program. Although federal requirements do not require using standardized test…
Prefocal station mechanical design concept study for the E-ELT
NASA Astrophysics Data System (ADS)
Jolley, Paul; Brunetto, Enzo; Frank, Christoph; Lewis, Steffan; Marchetti, Enrico
2016-07-01
The Nasmyth platforms of the E-ELT will contain one Prefocal Station (PFS) each. The main PFS functional requirements are to provide a focal plane to the three Nasmyth focal stations and the Coudé focus, optical sensing supporting telescope low order optimisation and seeing limited image quality, and optical sensing supporting characterising and phasing of M1 and other telescope subsystems. The PFS user requirements are used to derive the PFS technical requirements specification that will form the basis for design, development and production of the system. This specification process includes high-level architectural decisions and technical performance budget allocations. The mechanical design concepts reported here have been developed in order to validate key system specifications and associated technical budgets.
Developing Technical Skill Assessments
ERIC Educational Resources Information Center
Hyslop, Alisha
2009-01-01
One of the biggest challenges facing the career and technical education (CTE) community as it works to implement the 2006 Perkins Act is responding to more rigorous requirements for reporting on CTE students' technical skill attainment. The U.S. Department of Education suggested in non-regulatory guidance that states and locals use the number of…
Evaluating Technical Communication Faculty: Some Empirically-Based Criteria and Guidelines. Draft.
ERIC Educational Resources Information Center
Stevenson, Dwight W.
As technical communication is a young academic discipline, evaluating technical communication faculty for promotion, tenure, and merit purposes requires special awareness and care. To determine reasonable expectations of faculty achievement, a study documented the range, types, and frequency of activities of 12 professors and 12 associate…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... Information Collection for Public Comment; Office of Native American Programs (ONAP) Training and Technical... subject proposal. The data required by Office of Native American Programs Training and Technical... progress. The data identifies needs, outputs and outcomes of the training and technical assistance. DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... Information; Assistive Technology Act of 1998, as Amended--National Activities--State Training and Technical... requirement to support training and technical assistance to the entities funded under the AT Act to improve... applications that meet this priority. This priority is: State Training and Technical Assistance for Assistive...