Sample records for required beginning date

  1. 26 CFR 1.401(a)(9)-3 - Death before required beginning date.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Death before required beginning date. 1.401(a)(9...)-3 Death before required beginning date. Q-1. If an employee dies before the employee's required... within 5 years of the employee's death regardless of who or what entity receives the distribution...

  2. 26 CFR 1.401(a)(9)-3 - Death before required beginning date.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 26 Internal Revenue 5 2014-04-01 2014-04-01 false Death before required beginning date. 1.401(a)(9.... § 1.401(a)(9)-3 Death before required beginning date. Q-1. If an employee dies before the employee's... employee be distributed within 5 years of the employee's death regardless of who or what entity receives...

  3. 26 CFR 1.401(a)(9)-3 - Death before required beginning date.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 5 2011-04-01 2011-04-01 false Death before required beginning date. 1.401(a)(9.... § 1.401(a)(9)-3 Death before required beginning date. Q-1. If an employee dies before the employee's... employee be distributed within 5 years of the employee's death regardless of who or what entity receives...

  4. 26 CFR 1.401(a)(9)-3 - Death before required beginning date.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 26 Internal Revenue 5 2013-04-01 2013-04-01 false Death before required beginning date. 1.401(a)(9.... § 1.401(a)(9)-3 Death before required beginning date. Q-1. If an employee dies before the employee's... employee be distributed within 5 years of the employee's death regardless of who or what entity receives...

  5. 26 CFR 1.401(a)(9)-3 - Death before required beginning date.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 26 Internal Revenue 5 2012-04-01 2011-04-01 true Death before required beginning date. 1.401(a)(9.... § 1.401(a)(9)-3 Death before required beginning date. Q-1. If an employee dies before the employee's... employee be distributed within 5 years of the employee's death regardless of who or what entity receives...

  6. 26 CFR 1.9001-2 - Basis adjustments for taxable years beginning on or after 1956 adjustment date.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... on or after 1956 adjustment date. 1.9001-2 Section 1.9001-2 Internal Revenue INTERNAL REVENUE SERVICE....9001-2 Basis adjustments for taxable years beginning on or after 1956 adjustment date. (a) In general. Subsection (d) of the Act provides the basis adjustments required to be made by the taxpayer as of the 1956...

  7. 33 CFR 127.317 - Declaration of inspection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... handling LNG; (2) The date and time that transfer operations begin; (3) A list of the requirements in § 127... operations and the date and time of signing, indicating that he or she is ready to begin transfer operations... inspection. (a) After the preliminary transfer inspection under § 127.315 has been satisfactorily completed...

  8. 33 CFR 127.317 - Declaration of inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... handling LNG; (2) The date and time that transfer operations begin; (3) A list of the requirements in § 127... operations and the date and time of signing, indicating that he or she is ready to begin transfer operations... inspection. (a) After the preliminary transfer inspection under § 127.315 has been satisfactorily completed...

  9. 33 CFR 127.317 - Declaration of inspection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... handling LNG; (2) The date and time that transfer operations begin; (3) A list of the requirements in § 127... operations and the date and time of signing, indicating that he or she is ready to begin transfer operations... inspection. (a) After the preliminary transfer inspection under § 127.315 has been satisfactorily completed...

  10. 33 CFR 127.317 - Declaration of inspection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... handling LNG; (2) The date and time that transfer operations begin; (3) A list of the requirements in § 127... operations and the date and time of signing, indicating that he or she is ready to begin transfer operations... inspection. (a) After the preliminary transfer inspection under § 127.315 has been satisfactorily completed...

  11. 33 CFR 127.317 - Declaration of inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... handling LNG; (2) The date and time that transfer operations begin; (3) A list of the requirements in § 127... operations and the date and time of signing, indicating that he or she is ready to begin transfer operations... inspection. (a) After the preliminary transfer inspection under § 127.315 has been satisfactorily completed...

  12. 75 FR 56916 - Viruses, Serums, Toxins, and Analogous Products; Expiration Date Required for Serials and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... stability-indicating assay; require stability monitoring of products after licensing; and specify a single... monitoring the stability of the product and the suitability of its proposed dating period. \\1\\ To view the... of production serials beginning on the day of filling into final containers or the date final...

  13. 7 CFR 1710.401 - Loan application documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... beginning date of the loan period and shall be the same as the date on the Financial and Statistical Report... headquarters facilities, Form 740g need not be submitted. (5) Financial and statistical report. Distribution... activities. (13) Federal debt delinquency requirements. See 1710.126. The following documents are required...

  14. 33 CFR 105.115 - Compliance dates.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Compliance dates. 105.115 Section... MARITIME SECURITY: FACILITIES General § 105.115 Compliance dates. (a) On or before December 31, 2003... required to obtain a TWIC under this part may enroll beginning after the date set by the Coast Guard in a...

  15. 34 CFR 682.405 - Loan rehabilitation agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... first required due date falls and ends with the ninth consecutive calendar month following that month... that begins with the month in which the first required due date falls and ends with the ninth... guaranty agency); and (3) A statement of the unpaid balance on all FFEL loans held by other holders. (iv...

  16. 40 CFR 63.2180 - What notifications must I submit and when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required in § 63.7(b)(1). (d) If you are required to conduct a performance evaluation as specified in § 63.2163(b), you must submit a notification of the date of the performance evaluation at least 60 days prior to the date the performance evaluation is scheduled to begin as required in § 63.8(e)(2). (e) If...

  17. Suburban Legend: School Cutoff Dates and the Timing of Births

    ERIC Educational Resources Information Center

    Dickert-Conlin, Stacy; Elder, Todd

    2010-01-01

    Many states require children to reach age 5 by a specified date in the calendar year in order to begin kindergarten. We use birth certificate records from 1999 to 2004 to assess whether parents systematically time childbirth before these eligibility cutoff dates to capture the option value of sending their child to school at a relatively young…

  18. 5 CFR 330.704 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Eligibility for special selection priority begins: (1) On the date the agency issues the RIF separation notice... requirements set forth in paragraph (a) of this section (e.g., the employee is no longer being separated by RIF... to the RIF effective date); or (6) At an agency's discretion, when an eligible employee declines a...

  19. 40 CFR 63.163 - Standards: Pumps in light liquid service.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... later than 1 year after the compliance date; and (C) Phase III, beginning no later than 21/2 years after... requirements; and (B) Beginning no later than 1 year after initial start-up, comply with the Phase III... parts per million or greater. (ii) For Phase II, an instrument reading of 5,000 parts per million or...

  20. 40 CFR 63.163 - Standards: Pumps in light liquid service.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... later than 1 year after the compliance date; and (C) Phase III, beginning no later than 21/2 years after... requirements; and (B) Beginning no later than 1 year after initial start-up, comply with the Phase III... parts per million or greater. (ii) For Phase II, an instrument reading of 5,000 parts per million or...

  1. 40 CFR 63.163 - Standards: Pumps in light liquid service.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... later than 1 year after the compliance date; and (C) Phase III, beginning no later than 21/2 years after... requirements; and (B) Beginning no later than 1 year after initial start-up, comply with the Phase III... parts per million or greater. (ii) For Phase II, an instrument reading of 5,000 parts per million or...

  2. 20 CFR 218.14 - When a child annuity begins.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false When a child annuity begins. 218.14 Section... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.14 When a child annuity begins. (a) A child annuity begins on the later of either the date chosen by the applicant or the earliest date...

  3. 20 CFR 218.14 - When a child annuity begins.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true When a child annuity begins. 218.14 Section... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.14 When a child annuity begins. (a) A child annuity begins on the later of either the date chosen by the applicant or the earliest date...

  4. 20 CFR 218.14 - When a child annuity begins.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false When a child annuity begins. 218.14 Section... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.14 When a child annuity begins. (a) A child annuity begins on the later of either the date chosen by the applicant or the earliest date...

  5. 20 CFR 218.14 - When a child annuity begins.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true When a child annuity begins. 218.14 Section... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.14 When a child annuity begins. (a) A child annuity begins on the later of either the date chosen by the applicant or the earliest date...

  6. 20 CFR 218.11 - When a spouse annuity begins.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false When a spouse annuity begins. 218.11 Section... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.11 When a spouse annuity begins. (a) A spouse annuity begins on the later of either the date chosen by the applicant or the earliest date...

  7. 45 CFR 307.11 - Functional requirements for computerized support enforcement systems in operation by October 1...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...; (ii) Social security numbers; (iii) Dates of birth; (iv) Case identification numbers; (v) Other... collected amounts; (v) The birth date and, beginning no later than October 1, 1999, the name and social... orders through an automated information network in meeting paragraph (e)(2)(ii) of this section provided...

  8. 38 CFR 21.9625 - Beginning dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Entrance or reentrance including change of program or institution of higher learning. When an eligible... institution of higher learning), the beginning date of his or her award of educational assistance will be... education, the beginning date will be the latest of— (A) The date the institution of higher learning...

  9. 40 CFR 63.3960 - By what date must I conduct performance tests and other initial compliance demonstrations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compliance date specified in § 63.3883. For magnet wire coating operations you may, with approval, conduct a performance test of one representative magnet wire coating machine for each group of identical or very similar magnet wire coating machines. (2) You must develop and begin implementing the work practice plan required...

  10. 20 CFR 218.10 - When a supplemental annuity begins.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false When a supplemental annuity begins. 218.10... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.10 When a supplemental annuity begins. An employee supplemental annuity begins on the latest of— (a) The beginning date of the employee age or...

  11. 7 CFR 210.18 - Administrative reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...: (i) Review all approved free and reduced price applications for children in the reviewed schools back... AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM Requirements for State Agency Participation § 210.18 Administrative reviews. (a) Implementation dates. For the school year beginning July 1, 1992...

  12. 7 CFR 210.18 - Administrative reviews.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...: (i) Review all approved free and reduced price applications for children in the reviewed schools back... AGRICULTURE CHILD NUTRITION PROGRAMS NATIONAL SCHOOL LUNCH PROGRAM Requirements for State Agency Participation § 210.18 Administrative reviews. (a) Implementation dates. For the school year beginning July 1, 1992...

  13. 14 CFR 34.20 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Exhaust Emissions (New Aircraft Gas Turbine Engines) § 34.20 Applicability. The provisions of this subpart are applicable to all aircraft gas turbine engines of the classes specified beginning on the dates specified in § 34.21. ...

  14. 14 CFR 34.20 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Exhaust Emissions (New Aircraft Gas Turbine Engines) § 34.20 Applicability. The provisions of this subpart are applicable to all aircraft gas turbine engines of the classes specified beginning on the dates specified in § 34.21. ...

  15. 14 CFR 34.20 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... EXHAUST EMISSION REQUIREMENTS FOR TURBINE ENGINE POWERED AIRPLANES Exhaust Emissions (New Aircraft Gas Turbine Engines) § 34.20 Applicability. The provisions of this subpart are applicable to all aircraft gas turbine engines of the classes specified beginning on the dates specified in § 34.21. ...

  16. Monitoring trends in waiting periods in Canada for elective surgery: validation of a method using administrative data.

    PubMed

    Shortt, Samuel E D; Shaw, Ralph A; Elliott, David; Mackillop, William J

    2004-06-01

    Provincial governments require timely, economical methods to monitor surgical waiting periods. Although use of prospective procedure-specific registers would be the ideal method, a less elaborate system has been proposed that is based on physician billing data. This study assessed the validity of using the date of the last service billed prior to surgery as a proxy for the beginning of the post-referral, pre-surgical waiting period. We examined charts for 31,824 elective surgical encounters between 1992 and 1996 at an Ontario teaching hospital. The date of the last service before surgery (the last billing date) was compared with the date of the consultant's letter indicating a decision to book surgery (i.e., to begin waiting). Several surgical specialties (but excluding cardiac, orthopedic and gynecologic) had a close correlation between the dates of the last pre-surgery visit and those of the actual decision to place the patient on the waiting list. Similar results were found for 12 of 15 individually studied procedures, including some orthopedic and gynecological procedures. Used judiciously, billing data is a timely, inexpensive and generally accurate method by which provincial governments could monitor trends in waiting times for appropriately selected surgical procedures.

  17. 26 CFR 1.403(b)-6 - Timing of distributions and benefits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... plan or church plan, the required beginning date for a 5-percent owner is April 1 of the calendar year... taxation of a loan made under a section 403(b) contract. (Further, see section 408(b)(1) of Title I of...

  18. 26 CFR 1.403(b)-6 - Timing of distributions and benefits.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... plan or church plan, the required beginning date for a 5-percent owner is April 1 of the calendar year... taxation of a loan made under a section 403(b) contract. (Further, see section 408(b)(1) of title I of...

  19. 26 CFR 1.403(b)-6 - Timing of distributions and benefits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... plan or church plan, the required beginning date for a 5-percent owner is April 1 of the calendar year... taxation of a loan made under a section 403(b) contract. (Further, see section 408(b)(1) of Title I of...

  20. 26 CFR 1.403(b)-6 - Timing of distributions and benefits.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... plan or church plan, the required beginning date for a 5-percent owner is April 1 of the calendar year... taxation of a loan made under a section 403(b) contract. (Further, see section 408(b)(1) of title I of...

  1. 26 CFR 1.403(b)-6 - Timing of distributions and benefits.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... plan or church plan, the required beginning date for a 5-percent owner is April 1 of the calendar year... taxation of a loan made under a section 403(b) contract. (Further, see section 408(b)(1) of Title I of...

  2. 7 CFR 926.5 - Fiscal period.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... RECORDKEEPING REQUIREMENTS APPLICABLE TO CRANBERRIES NOT SUBJECT TO THE CRANBERRY MARKETING ORDER § 926.5 Fiscal... beginning September 1 and ending August 31 of the following year. Effective Date Note: At 71 FR 78046, Dec...

  3. 24 CFR 576.102 - Emergency shelter component.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... offered by rape crisis centers and domestic violence shelters, and other organizations with a documented... required under the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (URA... assigned by an independent real estate appraiser. The minimum use period must begin on the date the...

  4. 24 CFR 576.102 - Emergency shelter component.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... offered by rape crisis centers and domestic violence shelters, and other organizations with a documented... required under the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (URA... assigned by an independent real estate appraiser. The minimum use period must begin on the date the...

  5. 40 CFR 63.1439 - General recordkeeping and reporting provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-month period beginning on the date the Notification of Compliance Status is due. Subsequent reports shall cover each preceding 6-month period. (ii) If none of the compliance exceptions in paragraphs (e)(6)(iii) through (vii) of this section occurred during the 6-month period, the Periodic Report required by...

  6. 75 FR 15484 - Railroad Safety Technology Program Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... governments for projects that have a public benefit of improved railroad safety and efficiency. The program... State and local governments for projects * * * that have a public benefit of improved safety and network... minimum 20 percent grantee cost share (cash or in-kind) match requirement. DATES: FRA will begin accepting...

  7. 40 CFR 80.1354 - What are the reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for the gasoline benzene program? 80.1354 Section 80.1354 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline... gasoline benzene program? (a) Beginning with earliest applicable date specified in § 80.1347(a)(2), any...

  8. 40 CFR 80.1354 - What are the reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for the gasoline benzene program? 80.1354 Section 80.1354 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline... gasoline benzene program? (a) Beginning with earliest applicable date specified in § 80.1347(a)(2), any...

  9. 40 CFR 80.1354 - What are the reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for the gasoline benzene program? 80.1354 Section 80.1354 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline... gasoline benzene program? (a) Beginning with earliest applicable date specified in § 80.1347(a)(2), any...

  10. 40 CFR 80.1354 - What are the reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for the gasoline benzene program? 80.1354 Section 80.1354 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline... gasoline benzene program? (a) Beginning with earliest applicable date specified in § 80.1347(a)(2), any...

  11. 40 CFR 80.1354 - What are the reporting requirements for the gasoline benzene program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for the gasoline benzene program? 80.1354 Section 80.1354 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline... gasoline benzene program? (a) Beginning with earliest applicable date specified in § 80.1347(a)(2), any...

  12. 26 CFR 1.856-2 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TAXES Real Estate Investment Trusts § 1.856-2 Limitations. (a) Effective date. The provisions of part II... estate investment trust beginning after December 31, 1960. (b) Election. Under the provisions of section 856(c)(1), a trust, even though it satisfies the other requirements of part II of subchapter M for the...

  13. 24 CFR 203.26 - Mortgagor's payments when mortgage is executed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... rents, if any, the estimated taxes, special assessments, flood insurance premiums, if required, and fire and other hazard insurance premiums for the period beginning on the last date on which each such... installment payment under the mortgage, plus an amount sufficient to pay the mortgage insurance premium from...

  14. 24 CFR 203.26 - Mortgagor's payments when mortgage is executed.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... rents, if any, the estimated taxes, special assessments, flood insurance premiums, if required, and fire and other hazard insurance premiums for the period beginning on the last date on which each such... installment payment under the mortgage, plus an amount sufficient to pay the mortgage insurance premium from...

  15. 40 CFR 600.312-86 - Labeling, reporting, and recordkeeping; Administrator reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... shall constitute the EPA fuel economy estimates unless the Administrator determines that they are not... Fuel Economy Estimates. (iii) If additional information is required, the Administrator shall request... new vehicles which are unsold beginning no later than 15 calendar days after the date of notification...

  16. 40 CFR 262.213 - Laboratory clean-outs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... eligible academic entity is not required to count a hazardous waste that is an unused commercial chemical..., subpart C) generated solely during the laboratory clean-out toward its hazardous waste generator status... out, the date the laboratory clean-out begins and ends, and the volume of hazardous waste generated...

  17. 77 FR 30216 - Approval and Promulgation of Air Quality Implementation Plans; Maine; Reasonably Available...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... them into the Maine SIP: Revised Chapter 131, Cutback Asphalt and Emulsified Asphalt Regulation... recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: May 8, 2012. Ira W. Leighton... begins]. * * * * * * * Chapter 131 Cutback Asphalt and 09/15/2009 05/22/2012 [Insert Emulsified Asphalt...

  18. Monitoring trends in waiting periods in Canada for elective surgery: validation of a method using administrative data

    PubMed Central

    Shortt, Samuel E.D.; Shaw, Ralph A.; Elliott, David; Mackillop, William J.

    2004-01-01

    Background Provincial governments require timely, economical methods to monitor surgical waiting periods. Although use of prospective procedure-specific registers would be the ideal method, a less elaborate system has been proposed that is based on physician billing data. This study assessed the validity of using the date of the last service billed prior to surgery as a proxy for the beginning of the post-referral, pre-surgical waiting period. Method We examined charts for 31 824 elective surgical encounters between 1992 and 1996 at an Ontario teaching hospital. The date of the last service before surgery (the last billing date) was compared with the date of the consultant's letter indicating a decision to book surgery (i.e., to begin waiting). Results Several surgical specialties (but excluding cardiac, orthopedic and gynecologic) had a close correlation between the dates of the last pre-surgery visit and those of the actual decision to place the patient on the waiting list. Similar results were found for 12 of 15 individually studied procedures, including some orthopedic and gynecological procedures. Conclusion Used judiciously, billing data is a timely, inexpensive and generally accurate method by which provincial governments could monitor trends in waiting times for appropriately selected surgical procedures. PMID:15264378

  19. 38 CFR 21.9625 - Beginning dates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of higher learning certifies under paragraph (b) or (c) of this section; (B) The effective date of...) Entrance or reentrance including change of program or institution of higher learning. When an eligible... institution of higher learning), the beginning date of his or her award of educational assistance will be...

  20. 38 CFR 21.9625 - Beginning dates.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of higher learning certifies under paragraph (b) or (c) of this section; (B) The effective date of...) Entrance or reentrance including change of program or institution of higher learning. When an eligible... institution of higher learning), the beginning date of his or her award of educational assistance will be...

  1. 40 CFR 63.1335 - General recordkeeping and reporting provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... be submitted semiannually no later than 60 days after the end of each 6-month period. The first... due and shall cover the 6-month period beginning on the date the Notification of Compliance Status is...) of this section occurred during the 6-month period, the Periodic Report required by paragraph (e)(6...

  2. 26 CFR 1.338-5 - Adjusted grossed-up basis.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... decrease with respect to an element of AGUB is required under general principles of tax law, redetermined... initially determined at the beginning of the day after the acquisition date of target. General principles of..., under general principles of tax law, with respect to an element of AGUB. For example, AGUB is...

  3. 7 CFR 1424.5 - Agreement process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... basis. (b) Sign-up each FY will be held for 30 calendar days beginning for: (1) FY 2003 on the date of... participate, an eligible producer must submit a signed agreement during the FY sign-up period. Agreements may be for single or multiple FY's. However, multiple FY agreements require producers to submit annual...

  4. 77 FR 41276 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Nonattainment New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... precursors. They also establish nitrogen oxides (NO X ) and sulfur dioxide (SO 2 ) as precursors to PM 2.5... recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated: June 26, 2012. W.C. Early, Acting..., modified document begins]. definitions of ``regulated NSR pollutant'' and ``significant,'' and removed...

  5. 76 FR 75427 - Farm Loan Programs Loan Making Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... prior farming experience of the applicant. This amendment is required by sections 5001 and 5101 of the... years prior to the date of the application, if all prior farming occurred more than five years prior to...: (1) Is a beginning farmer or socially disadvantaged farmer engaged primarily in farming in the United...

  6. Temperature and geographic attribution of change in the Taraxacum mongolicum growing season from 1990 to 2009 in eastern China's temperate zone.

    PubMed

    Chen, Xiaoqiu; Tian, Youhua; Xu, Lin

    2015-10-01

    Using leaf unfolding and leaf coloration data of a widely distributed herbaceous species, Taraxacum mongolicum, we detected linear trend and temperature response of the growing season at 52 stations from 1990 to 2009. Across the research region, the mean growing season beginning date marginal significantly advanced at a rate of -2.1 days per decade, while the mean growing season end date was significantly delayed at a rate of 3.1 days per decade. The mean growing season length was significantly prolonged at a rate of 5.1 days per decade. Over the 52 stations, linear trends of the beginning date correlate negatively with linear trends of spring temperature, whereas linear trends of the end date and length correlate positively with linear trends of autumn temperature and annual mean temperature. Moreover, the growing season linear trends are also closely related to the growing season responses to temperature and geographic coordinates plus elevation. Regarding growing season responses to temperature, a 1 °C increase in regional mean spring temperature results in an advancement of 2.1 days in regional mean growing season beginning date, and a 1 °C increase in regional mean autumn temperature causes a delay of 2.3 days in regional mean growing season end date. A 1 °C increase in regional annual mean temperature induces an extension of 8.7 days in regional mean growing season length. Over the 52 stations, response of the beginning date to spring temperature depends mainly on local annual mean temperature and geographic coordinates plus elevation. Namely, a 1 °C increase in spring temperature induces a larger advancement of the beginning date at warmer locations with lower latitudes and further west longitudes than at colder locations with higher latitudes and further east longitudes, while a 1 °C increase in spring temperature causes a larger advancement of the beginning date at higher than at lower elevations.

  7. Temperature and geographic attribution of change in the Taraxacum mongolicum growing season from 1990 to 2009 in eastern China's temperate zone

    NASA Astrophysics Data System (ADS)

    Chen, Xiaoqiu; Tian, Youhua; Xu, Lin

    2015-10-01

    Using leaf unfolding and leaf coloration data of a widely distributed herbaceous species, Taraxacum mongolicum, we detected linear trend and temperature response of the growing season at 52 stations from 1990 to 2009. Across the research region, the mean growing season beginning date marginal significantly advanced at a rate of -2.1 days per decade, while the mean growing season end date was significantly delayed at a rate of 3.1 days per decade. The mean growing season length was significantly prolonged at a rate of 5.1 days per decade. Over the 52 stations, linear trends of the beginning date correlate negatively with linear trends of spring temperature, whereas linear trends of the end date and length correlate positively with linear trends of autumn temperature and annual mean temperature. Moreover, the growing season linear trends are also closely related to the growing season responses to temperature and geographic coordinates plus elevation. Regarding growing season responses to temperature, a 1 °C increase in regional mean spring temperature results in an advancement of 2.1 days in regional mean growing season beginning date, and a 1 °C increase in regional mean autumn temperature causes a delay of 2.3 days in regional mean growing season end date. A 1 °C increase in regional annual mean temperature induces an extension of 8.7 days in regional mean growing season length. Over the 52 stations, response of the beginning date to spring temperature depends mainly on local annual mean temperature and geographic coordinates plus elevation. Namely, a 1 °C increase in spring temperature induces a larger advancement of the beginning date at warmer locations with lower latitudes and further west longitudes than at colder locations with higher latitudes and further east longitudes, while a 1 °C increase in spring temperature causes a larger advancement of the beginning date at higher than at lower elevations.

  8. 26 CFR 1.336-3 - Aggregate deemed asset disposition price; various aspects of taxation of the deemed asset...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES... decrease is required under general principles of tax law with respect to an element of ADADP, the... determined at the beginning of the day after the disposition date of Target. General principles of tax law...

  9. 26 CFR 1.469-11 - Effective date and transition rules.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) as income that is not from a passive activity for any taxable year of the taxpayer beginning before... taxpayer is not required to apply the rules in § 1.469-7 in computing the taxpayer's passive activity loss and passive activity credit; and (2) A taxpayer that owns an interest in a passthrough entity may use...

  10. 24 CFR 135.30 - Numerical goals for meeting the greatest extent feasible requirement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... date of this rule. (3) For recipients that do not engage in training, or hiring, but award contracts to... (b) of this section apply to new hires. The numerical goals reflect the aggregate hires. Efforts to... percent of the aggregate number of new hires for the one year period beginning in FY 1995; (ii) 20 percent...

  11. 77 FR 56703 - Public Hearing to Determine Whether ZAP Has Met Notification and Remedy Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ...: NHTSA will hold a public hearing on whether ZAP,\\1\\ a publicly owned company based in Santa Rosa... those noncompliances in two recalls involving Model Year (MY) 2008 ZAP Xebra three-wheeled vehicles.../ . DATES: The public hearing will be held beginning at 10 a.m. ET on October 9, 2012 in the Oklahoma City...

  12. Exploring the Link between Alcohol and Marijuana Use and Teen Dating Violence Victimization among High School Students: The Influence of School Context

    ERIC Educational Resources Information Center

    Parker, Elizabeth M.; Debnam, Katrina; Pas, Elise T.; Bradshaw, Catherine P.

    2016-01-01

    Background: Adolescence is a developmental period when dating behavior is first initiated and when the risk of abuse by or against a dating partner begins to emerge. It is also one in which experimentation with alcohol and illicit substances typically begins. The current study examined the association between recent alcohol use and recent…

  13. Myth of the "Last-In" Superstar: Resist the Current Notion by Focusing Instead on Coaching Your Beginning Teachers

    ERIC Educational Resources Information Center

    Chesley, Gary; Hartman, Diane

    2012-01-01

    For decades, when budgets dictated teacher cutbacks, no judgment of instructional skills was required. No evaluation of student results changed the outcome. No one consulted a summative evaluation. Schools just went to the personnel file, determined hiring dates, and the last one in lost her or his chair. In the new political landscape, lawmakers…

  14. 40 CFR 112.3 - Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... month period in the three years prior to the SPCC Plan self-certification date, or since becoming... § 112.1(b), you must prepare and implement a Plan within six months after you begin operations. (c) If... individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons. (2) A Tier II...

  15. 7 CFR 1416.101 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... on the beginning date of the applicable disaster period. Adult beef cows means female bovine animals... bred beef heifer shall also be considered an adult beef cow if it was pregnant on the beginning date of... buffalo and beefalo cows means female animals of those breeds that had delivered one or more offspring...

  16. Proceedings of the Meeting of the Special Interest Group on Control Theory (1st) Held at Aberdeen Proving Ground, Maryland on 22 May 80,

    DTIC Science & Technology

    1980-05-01

    elements that will form the candi- existing targets are given In References 2 and S. date GIC systems; The effectiveness of any missile system Is con- a...authority is specified as that a sensor using some form of pattern recogni- tion may be required. The problem is to find or ot , .- I K (2, begin...have the requirements imposed by an advanced G&C system. been derived so that the resulting formulation is deliberately cast in a form particularly

  17. 7 CFR 760.302 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... breeding purposes on or before the beginning date of a qualifying drought or fire. Adult beef cow means a... qualifying drought or fire. Adult buffalo and beefalo bull means a male animal of those breeds that was at least 2 years old and used for breeding purposes on or before the beginning date of a qualifying drought...

  18. 7 CFR 760.302 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... breeding purposes on or before the beginning date of a qualifying drought or fire. Adult beef cow means a... qualifying drought or fire. Adult buffalo and beefalo bull means a male animal of those breeds that was at least 2 years old and used for breeding purposes on or before the beginning date of a qualifying drought...

  19. 7 CFR 760.302 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... breeding purposes on or before the beginning date of a qualifying drought or fire. Adult beef cow means a... qualifying drought or fire. Adult buffalo and beefalo bull means a male animal of those breeds that was at least 2 years old and used for breeding purposes on or before the beginning date of a qualifying drought...

  20. 7 CFR 760.1102 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... that was at least 2 years old and used for breeding purposes on the beginning date of the disaster... the disaster period. A first-time bred beef heifer is also considered an adult beef cow if it was... of those breeds that was at least 2 years old and used for breeding purposes on the beginning date of...

  1. 7 CFR 760.302 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... breeding purposes on or before the beginning date of a qualifying drought or fire. Adult beef cow means a... is also considered an adult beef cow if it was pregnant on or before the beginning date of a... or fire. Adult buffalo and beefalo cow means a female animal of those breeds that had delivered one...

  2. 20 CFR 218.26 - Work started after annuity beginning date.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... rights to return to work for a railroad employee before starting any new work. (2) Age annuity. An... employee, spouse or divorced spouse gives up all rights to return to work for a railroad employer before... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Work started after annuity beginning date...

  3. 24 CFR 203.284 - Calculation of up-front and annual MIP on or after July 1, 1991.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... mortgage executed after December 27, 2005, which is insured under sections 203(k) or 234(c) of the National Housing Act (12 U.S.C. 1709(k) and 12 U.S.C. 1715y(c)) shall be subject to the following requirements: (1... amortization, or for a 12-month period preceding a subsequent anniversary date of the beginning of amortization...

  4. 24 CFR 203.284 - Calculation of up-front and annual MIP on or after July 1, 1991.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... mortgage executed after December 27, 2005, which is insured under sections 203(k) or 234(c) of the National Housing Act (12 U.S.C. 1709(k) and 12 U.S.C. 1715y(c)) shall be subject to the following requirements: (1... amortization, or for a 12-month period preceding a subsequent anniversary date of the beginning of amortization...

  5. 24 CFR 203.284 - Calculation of up-front and annual MIP on or after July 1, 1991.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... mortgage executed after December 27, 2005, which is insured under sections 203(k) or 234(c) of the National Housing Act (12 U.S.C. 1709(k) and 12 U.S.C. 1715y(c)) shall be subject to the following requirements: (1... amortization, or for a 12-month period preceding a subsequent anniversary date of the beginning of amortization...

  6. 20 CFR 218.15 - When a parent annuity begins.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false When a parent annuity begins. 218.15 Section 218.15 Employees' Benefits RAILROAD RETIREMENT BOARD REGULATIONS UNDER THE RAILROAD RETIREMENT ACT ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.15 When a parent annuity begins. A parent...

  7. 20 CFR 218.9 - When an employee annuity begins.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false When an employee annuity begins. 218.9... ANNUITY BEGINNING AND ENDING DATES When an Annuity Begins § 218.9 When an employee annuity begins. (a) Full-age annuity—employee has completed 10 years but less than 30 years of service. An employee full...

  8. 42 CFR 405.1014 - Request for an ALJ hearing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 2 2011-10-01 2011-10-01 false Request for an ALJ hearing. 405.1014 Section 405...'s reconsideration, the deadline specified in § 405.1016 for deciding the appeal begins on the date..., the adjudication period in § 405.1016 begins the date the ALJ grants the request to extend the filing...

  9. 42 CFR 405.1014 - Request for an ALJ hearing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Request for an ALJ hearing. 405.1014 Section 405...'s reconsideration, the deadline specified in § 405.1016 for deciding the appeal begins on the date..., the adjudication period in § 405.1016 begins the date the ALJ grants the request to extend the filing...

  10. 33 CFR 127.1317 - Declaration of Inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...— (1) The name of the vessel and that of the facility; (2) The date and time that the transfer begins... to begin transfer; and (5) The signature of each relief person in charge and the date and time of... Inspection. (a) Each person in charge of transfer for the facility shall ensure that no person transfers LHG...

  11. 33 CFR 127.1317 - Declaration of Inspection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...— (1) The name of the vessel and that of the facility; (2) The date and time that the transfer begins... to begin transfer; and (5) The signature of each relief person in charge and the date and time of... Inspection. (a) Each person in charge of transfer for the facility shall ensure that no person transfers LHG...

  12. Violence in Adolescent Dating Relationships

    ERIC Educational Resources Information Center

    Jouriles, Ernest N.; Platt, Cora; McDonald, Renee

    2009-01-01

    Beginning with a definition of dating and dating violence among adolescents, this article explores the factors which impact such violence. It concludes with a review of two school-based prevention/intervention programs (Safe Dates and The Youth Relationships Project). (Contains 1 table.)

  13. 75 FR 72780 - Advisory Committee on Beginning Farmers and Ranchers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... Beginning Farmers and Ranchers AGENCY: Departmental Management, Office of Advocacy and Outreach, USDA... advise the public that meetings of the Advisory Committee on Beginning Farmers and Ranchers (Committee... Beginning Farmers and Ranchers.'' DATES: The public meetings will be held December 15th and 16th, 2010...

  14. 40 CFR 720.65 - Acknowledgement of receipt of a notice; errors in the notice; incomplete submissions; and false...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that identifies the premanufacture notice number assigned to the new chemical substance and date on which the review period begins. The review period will begin on the date the notice is received by the...). (ix) The submitter does not submit data which the submitter believes show that the chemical substance...

  15. 40 CFR 720.65 - Acknowledgement of receipt of a notice; errors in the notice; incomplete submissions; and false...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that identifies the premanufacture notice number assigned to the new chemical substance and date on which the review period begins. The review period will begin on the date the notice is received by the...). (ix) The submitter does not submit data which the submitter believes show that the chemical substance...

  16. Enumeration of Mars years and seasons since the beginning of telescopic exploration

    USGS Publications Warehouse

    Piqueux, Sylvain; Byrne, Shane; Titus, Timothy N.; Hansen, Candice J.; Kieffer, Hugh H.

    2015-01-01

    A clarification for the enumeration of Mars Years prior to 1955 is presented, along with a table providing the Julian dates associated with Ls = 0° for Mars Years -183 (beginning of the telescopic study of Mars) to 100. A practical algorithm for computing Ls as a function of the Julian Date is provided. No new science results are presented

  17. 18 CFR 11.7 - Effective date.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Effective date. 11.7... Dams § 11.7 Effective date. All annual charges imposed under this subpart will be computed beginning on the effective date of the license unless some other date is fixed in the license. [51 FR 24318, July 3...

  18. Efficacy of sequential use of fluoxetine for smoking cessation in elevated depressive symptom smokers.

    PubMed

    Brown, Richard A; Abrantes, Ana M; Strong, David R; Niaura, Raymond; Kahler, Christopher W; Miller, Ivan W; Price, Lawrence H

    2014-02-01

    Fluoxetine, a selective serotonin reuptake inhibitor, was examined in the treatment of smokers with elevated depressive symptoms. Specifically, this randomized, open-label clinical trial was designed to evaluate the efficacy of three logical, real-world alternatives for providing smoking cessation treatment to smokers with elevated depressive symptoms. In a sample of 216 smokers (mean Center for Epidemiological Studies Depression Scale score = 11.41), participants were randomly assigned to (a) transdermal nicotine patch (TNP), beginning on quit date and continuing for 8 weeks thereafter; (b) standard administration of antidepressant pharmacotherapy with fluoxetine (20mg), beginning 2 weeks before quit date and continuing for 8 weeks following quit date + TNP (ST-FLUOX); or (c) sequential administration of fluoxetine (20mg), beginning 8 weeks before quit date and continuing for 8 weeks following quit date + TNP (SEQ-FLUOX). All participants received 5 sessions of brief behavioral smoking cessation treatment. Findings indicate that SEQ-FLUOX resulted in significantly higher point prevalence abstinence than ST-FLUOX at 6-month follow-up (OR = 2.35; 95% CI = 1.10-5.02, p < .03), a difference that was reduced at the 12-month assessment. Furthermore, sequential fluoxetine treatment, compared with standard fluoxetine treatment, resulted in significantly lower levels of depressive symptoms throughout smoking cessation treatment (p < .025) and significantly lower nicotine withdrawal-related negative affect (p < .004) immediately after quitting. Findings suggest that if one is going to prescribe fluoxetine for smoking cessation in smokers with elevated depressive symptoms, it is best to begin prescribing fluoxetine well before the target quit date.

  19. Your Child's Immunization Record

    MedlinePlus

    Your Child’s Immunization Record It’s important to keep up-to-date records of all your child’s immunizations, beginning at birth and continuing through ... receives a vaccination by filling in the date. Record of Immunizations Date Given: Where Given: Reaction: Hepatitis ...

  20. Dating Violence, Bullying, and Sexual Harassment: Longitudinal Profiles and Transitions over Time

    ERIC Educational Resources Information Center

    Miller, Shari; Williams, Jason; Cutbush, Stacey; Gibbs, Deborah; Clinton-Sherrod, Monique; Jones, Sarah

    2013-01-01

    Although there is growing recognition of the problem of dating violence, little is known about how it unfolds among young adolescents who are just beginning to date. This study examined classes (subgroups) and transitions between classes over three time points based on dating violence, bullying, and sexual harassment perpetration and victimization…

  1. 33 CFR 106.110 - Compliance dates.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Compliance dates. 106.110 Section... MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES General § 106.110 Compliance dates. (a) On or... TWIC under this part may enroll beginning after the date set by the Coast Guard in a Notice to be...

  2. 75 FR 16516 - Dates Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION Office of the Federal Register Dates Correction Correction In the Notices section beginning on page 15401 in the issue of March 29th, 2010, make the following correction: On pages 15401 through 15499, the date at the top of each page is corrected to read...

  3. Logistics | Division of Cancer Prevention

    Cancer.gov

    Date and Time Registration will begin at 8:30 am on Friday, September 20th. The meeting will begin promptly at 9:00 am. Location NIH Campus Natcher Conference Center Building 45 45 Center Drive Bethesda, MD |

  4. Employee Retirement Income Security Act of 1974; rules and regulations for administration and enforcement; claims procedure. Final regulation; delay of applicability date.

    PubMed

    2001-07-09

    This action delays for at least six months and not more than one year the applicability date for the regulation governing minimum requirements for benefit claims procedures of group health plans covered by Title I of the Employee Retirement Income Security Act. As published on November 21, 2000, the benefit claims procedure would be applicable to claims filed on or after January 1, 2002. The current action amends the regulation so that it will apply to group health claims filed on or after the first day of the first plan year beginning on or after July 1, 2002, but in no event later than January 1, 2003. This action provides a limited additional period within which group health plan sponsors, administrators, and service providers can bring their claims processing systems into compliance with the new requirements. A postponement of the applicability date with respect to group health claims will allow a more orderly transition to the new standards and will avoid the confusion and additional expense that would be caused if certain pending Congressional bills are enacted before or soon after the original applicability date. This action does not apply to pension plans or plans providing disability or welfare benefits (other than group health). For these plans, the regulation will continue to be applicable to claims filed on or after January 1, 2002.

  5. 44 CFR 61.11 - Effective date and time of coverage under the Standard Flood Insurance Policy-New Business...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Effective date and time of... RATES § 61.11 Effective date and time of coverage under the Standard Flood Insurance Policy—New Business Applications and Endorsements. (a) During the 13-month period beginning on the effective date of a revised...

  6. 5 CFR 591.235 - When do COLA and post differential payments begin?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false When do COLA and post differential... Areas Program Administration § 591.235 When do COLA and post differential payments begin? (a) Agencies begin paying an employee a COLA or post differential on the effective date of the change in the employee...

  7. 5 CFR 591.235 - When do COLA and post differential payments begin?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false When do COLA and post differential... Areas Program Administration § 591.235 When do COLA and post differential payments begin? (a) Agencies begin paying an employee a COLA or post differential on the effective date of the change in the employee...

  8. 5 CFR 591.235 - When do COLA and post differential payments begin?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false When do COLA and post differential... Areas Program Administration § 591.235 When do COLA and post differential payments begin? (a) Agencies begin paying an employee a COLA or post differential on the effective date of the change in the employee...

  9. 5 CFR 591.235 - When do COLA and post differential payments begin?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false When do COLA and post differential... Areas Program Administration § 591.235 When do COLA and post differential payments begin? (a) Agencies begin paying an employee a COLA or post differential on the effective date of the change in the employee...

  10. 5 CFR 591.235 - When do COLA and post differential payments begin?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false When do COLA and post differential... Areas Program Administration § 591.235 When do COLA and post differential payments begin? (a) Agencies begin paying an employee a COLA or post differential on the effective date of the change in the employee...

  11. Solar array electrical performance assessment for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Smith, Bryan K.; Brisco, Holly

    1993-01-01

    Electrical power for Space Station Freedom will be generated by large Photovoltaic arrays with a beginning of life power requirement of 30.8 kW per array. The solar arrays will operate in a Low Earth Orbit (LEO) over a design life of fifteen years. This paper provides an analysis of the predicted solar array electrical performance over the design life and presents a summary of supporting analysis and test data for the assigned model parameters and performance loss factors. Each model parameter and loss factor is assessed based upon program requirements, component analysis, and test data to date. A description of the LMSC performance model, future test plans, and predicted performance ranges are also given.

  12. Solar array electrical performance assessment for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Smith, Bryan K.; Brisco, Holly

    1993-01-01

    Electrical power for Space Station Freedom will be generated by large photovoltaic arrays with a beginning of life power requirement of 30.8 kW per array. The solar arrays will operate in a Low Earth Orbit (LEO) over a design life of fifteen years. This paper provides an analysis of the predicted solar array electrical performance over the design life and presents a summary of supporting analysis and test data for the assigned model parameters and performance loss factors. Each model parameter and loss factor is assessed based upon program requirements, component analysis and test data to date. A description of the LMSC performance model future test plans and predicted performance ranges are also given.

  13. 40 CFR 63.2520 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... report. (3) Date of report and beginning and ending dates of the reporting period. (4) For each SSM... SSM. (A) The total operating time of the affected source during the reporting period. (B) Information...) of this section. This includes periods of SSM. (A) The date and time that each CMS was inoperative...

  14. 76 FR 36140 - South Dakota; Major Disaster and Related Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... determined that the damage in certain areas of the State of South Dakota resulting from flooding beginning on... declaration of a major disaster for the State of South Dakota (FEMA-1984-DR), dated May 13, 2011, and related determinations. DATES: Effective Date: May 13, 2011. FOR FURTHER INFORMATION CONTACT: Peggy Miller, Office of...

  15. 20 CFR 501.3 - Notice of Appeal.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., if applicable. (3) Employing establishment, and the date, description and place of injury. (4) Date... filing, the 180 day time period for filing an appeal begins to run on the day following the date of the..., Sunday or Federal holiday, in which event the period runs to the close of the next business day. (g...

  16. The Beginning of Protohaykian Calendar

    NASA Astrophysics Data System (ADS)

    Broutian, G. H.

    2017-07-01

    From its foundation, studies in the field of history of Armenian astronomy and Armenian calendars were integral to astrophysical researches of the Byurakan Observatory. It is important to note the monographs and articles of H. Badalian and B. Toumanian in this field. As the result of our work in this field, beginning of the Haykian calendar (BC 2341) and the concept of Protohaykian calendar were established. In the present work an attempt is made to determine the beginning of the oldest Armenian calendar-the Protohaykian calendar. It is shown that Protohaykian calendar was originated when the heliacal rising of the star Spica (α Virgo) was observable from Armenia 8 days before summer solstice. Calculations made on this basis provide date of the beginning of this calendar as BC 9000 with an error not to exceed 80 years. This date is in correspondence with the date of observations of the Pleiades from Metsamor (about BC 9000), that was found a few years ago. Meanwhile, it also corresponds to the geological data, which prove, that the oldest lake (Araratian Sea) in the territory of modern Araratian valley was dried out at the same time. There is also good correlation with the time of cultivation of crops that was done in the territory of historical Armenia about 12000 years ago.

  17. Application of carbon isotope stratigraphy to late miocene shallow marine sediments, new zealand.

    PubMed

    Loutit, T S; Kennett, J P

    1979-06-15

    A distinct (0.5 per mil) carbon-13/carbon-12 isotopic shift in the light direction has been identified in a shallow marine sedimentary sequence of Late Miocene age at Blind River, New Zealand, and correlated with a similar shift in Late Miocene Deep Sea Drilling Project sequences throughout the Indo-Pacific. A dated piston core provides an age for the shift of 6.2 +/- 0.1 million years. Correlations based on the carbon isotopic change require a revision of the previously established magnetostratigraphy at Blind River. The carbon shift at Blind River occurs between 6.2 and 6.3 +/- 0.1 million years before present. A new chronology provides an age for the evolutionary first appearance datum of Globorotalia conomiozea at 6.1 +/- 0.1 million years, the beginning of a distinct latest Miocene cooling event associated with the Kapitean stage at 6.2 +/- 0.1 million years, and the beginning of a distinct shallowing of water depths at 6.1 +/- 0.1 million years. The Miocene-Pliocene boundary as recognized in New Zealand is now dated at 5.3 +/- 0.1 million years. Extension of carbon isotope stratigraphy to other shallow Late Miocene sequences should provide an important datum for international correlation of Late Miocene shallow and deep marine sequences.

  18. 34 CFR 263.9 - When does payback begin?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF EDUCATION INDIAN EDUCATION DISCRETIONARY GRANT PROGRAMS Professional Development Program § 263... Professional Development program, payback shall begin within six months from the date of completion of the training. (b) For participants who do not complete their training under the Professional Development...

  19. 48 CFR 1552.216-71 - Date of incurrence of cost.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. The beginning dates and the not-to-exceed amount to be inserted in the clause should be those in the anticipatory cost letter...

  20. 48 CFR 1552.216-71 - Date of incurrence of cost.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. The beginning dates and the not-to-exceed amount to be inserted in the clause should be those in the anticipatory cost letter...

  1. 48 CFR 1552.216-71 - Date of incurrence of cost.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. The beginning dates and the not-to-exceed amount to be inserted in the clause should be those in the anticipatory cost letter...

  2. 48 CFR 1552.216-71 - Date of incurrence of cost.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. The beginning dates and the not-to-exceed amount to be inserted in the clause should be those in the anticipatory cost letter...

  3. 48 CFR 1552.216-71 - Date of incurrence of cost.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. The beginning dates and the not-to-exceed amount to be inserted in the clause should be those in the anticipatory cost letter...

  4. Past Victimizations and Dating Violence Perpetration in Adolescence: The Mediating Role of Emotional Distress and Hostility

    ERIC Educational Resources Information Center

    Boivin, Sophie; Lavoie, Francine; Hebert, Martine; Gagne, Marie-Helene

    2012-01-01

    This study aimed to understand the nature of the relationships between three forms of past victimizations (exposure to interparental violence in childhood, sexual harassment by peers since beginning high school, prior experience of dating violence), physical dating violence perpetration by adolescents, and anger-hostility and emotional distress.…

  5. 75 FR 17041 - Extension of the Compliance Date for Cockpit Voice Recorder and Digital Flight Data Recorder...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ...] RIN 2120-AJ65 Extension of the Compliance Date for Cockpit Voice Recorder and Digital Flight Data... March 7, 2008, the FAA published a final rule titled ``Revisions to Cockpit Voice Recorder and Digital... digital flight data recorder equipment on certain aircraft beginning April 7, 2010. That compliance date...

  6. 29 CFR 4006.5 - Exemptions and special rules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...

  7. 29 CFR 4006.5 - Exemptions and special rules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...

  8. 29 CFR 4006.5 - Exemptions and special rules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...

  9. 29 CFR 4006.5 - Exemptions and special rules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...

  10. 21 CFR 60.22 - Regulatory review period determinations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... drugs: (1) The testing phase begins on the date an exemption under section 505(i) of the Act becomes... Act and ends on the date the protocol is declared to be completed. (d) For animal drugs: (1) The... animal drug, whichever is earlier, and ends on the date a marketing application under section 512 of the...

  11. 21 CFR 60.22 - Regulatory review period determinations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... drugs: (1) The testing phase begins on the date an exemption under section 505(i) of the Act becomes... Act and ends on the date the protocol is declared to be completed. (d) For animal drugs: (1) The... animal drug, whichever is earlier, and ends on the date a marketing application under section 512 of the...

  12. 21 CFR 60.22 - Regulatory review period determinations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... drugs: (1) The testing phase begins on the date an exemption under section 505(i) of the Act becomes... Act and ends on the date the protocol is declared to be completed. (d) For animal drugs: (1) The... animal drug, whichever is earlier, and ends on the date a marketing application under section 512 of the...

  13. 21 CFR 60.22 - Regulatory review period determinations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... drugs: (1) The testing phase begins on the date an exemption under section 505(i) of the Act becomes... Act and ends on the date the protocol is declared to be completed. (d) For animal drugs: (1) The... animal drug, whichever is earlier, and ends on the date a marketing application under section 512 of the...

  14. 21 CFR 60.22 - Regulatory review period determinations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... drugs: (1) The testing phase begins on the date an exemption under section 505(i) of the Act becomes... Act and ends on the date the protocol is declared to be completed. (d) For animal drugs: (1) The... animal drug, whichever is earlier, and ends on the date a marketing application under section 512 of the...

  15. 26 CFR 1.709-2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... particular case. Ordinarily, a partnership begins business when it starts the business operations for which... business and ending with the date prescribed by law for filing the partnership return (determined without regard to any extensions of time) for the taxable year the partnership begins business. In addition, the...

  16. Federal Tax Implications of Charitable Gift Annuities

    ERIC Educational Resources Information Center

    Teitell, Conrad

    1975-01-01

    Surveys the federal tax implications of "immediate" charitable gift annuities (annuity payments beginning within one year of transfer) and "deferred payment" charitable gift annuities (beginning at a specified date), both of which enable individuals to make a charitable gift, retain a form of life income, and achieve federal…

  17. Dating rice remains through phytolith carbon-14 study reveals domestication at the beginning of the Holocene

    PubMed Central

    Lu, Houyuan; Jiang, Leping; Zhang, Jianping; Huan, Xiujia; He, Keyang; Wang, Can; Wu, Naiqin

    2017-01-01

    Phytolith remains of rice (Oryza sativa L.) recovered from the Shangshan site in the Lower Yangtze of China have previously been recognized as the earliest examples of rice cultivation. However, because of the poor preservation of macroplant fossils, many radiocarbon dates were derived from undifferentiated organic materials in pottery sherds. These materials remain a source of debate because of potential contamination by old carbon. Direct dating of the rice remains might serve to clarify their age. Here, we first validate the reliability of phytolith dating in the study region through a comparison with dates obtained from other material from the same layer or context. Our phytolith data indicate that rice remains retrieved from early stages of the Shangshan and Hehuashan sites have ages of approximately 9,400 and 9,000 calibrated years before the present, respectively. The morphology of rice bulliform phytoliths indicates they are closer to modern domesticated species than to wild species, suggesting that rice domestication may have begun at Shangshan during the beginning of the Holocene. PMID:28559349

  18. Dating rice remains through phytolith carbon-14 study reveals domestication at the beginning of the Holocene.

    PubMed

    Zuo, Xinxin; Lu, Houyuan; Jiang, Leping; Zhang, Jianping; Yang, Xiaoyan; Huan, Xiujia; He, Keyang; Wang, Can; Wu, Naiqin

    2017-06-20

    Phytolith remains of rice ( Oryza sativa L.) recovered from the Shangshan site in the Lower Yangtze of China have previously been recognized as the earliest examples of rice cultivation. However, because of the poor preservation of macroplant fossils, many radiocarbon dates were derived from undifferentiated organic materials in pottery sherds. These materials remain a source of debate because of potential contamination by old carbon. Direct dating of the rice remains might serve to clarify their age. Here, we first validate the reliability of phytolith dating in the study region through a comparison with dates obtained from other material from the same layer or context. Our phytolith data indicate that rice remains retrieved from early stages of the Shangshan and Hehuashan sites have ages of approximately 9,400 and 9,000 calibrated years before the present, respectively. The morphology of rice bulliform phytoliths indicates they are closer to modern domesticated species than to wild species, suggesting that rice domestication may have begun at Shangshan during the beginning of the Holocene.

  19. Electron bifurcation.

    PubMed

    Peters, John W; Miller, Anne-Frances; Jones, Anne K; King, Paul W; Adams, Michael Ww

    2016-04-01

    Electron bifurcation is the recently recognized third mechanism of biological energy conservation. It simultaneously couples exergonic and endergonic oxidation-reduction reactions to circumvent thermodynamic barriers and minimize free energy loss. Little is known about the details of how electron bifurcating enzymes function, but specifics are beginning to emerge for several bifurcating enzymes. To date, those characterized contain a collection of redox cofactors including flavins and iron-sulfur clusters. Here we discuss the current understanding of bifurcating enzymes and the mechanistic features required to reversibly partition multiple electrons from a single redox site into exergonic and endergonic electron transfer paths. Copyright © 2016. Published by Elsevier Ltd.

  20. 38 CFR 21.9625 - Beginning dates.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Payments-Educational Assistance § 21.9625 Beginning... determined as follows: (1) For other than a licensing or certification test. (i) If the award is an award for...) For a licensing or certification test. VA will award educational assistance for the cost of a...

  1. 38 CFR 21.9625 - Beginning dates.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) VOCATIONAL REHABILITATION AND EDUCATION Post-9/11 GI Bill Payments-Educational Assistance § 21.9625 Beginning... determined as follows: (1) For other than a licensing or certification test. (i) If the award is an award for...) For a licensing or certification test. VA will award educational assistance for the cost of a...

  2. 75 FR 39620 - Proposed Information Collection (Dependents' Educational Assistance (DEA) Election Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... (Dependents' Educational Assistance (DEA) Election Request) Activity: Comment Request AGENCY: Veterans... veterans beginning date to start their DEA benefits. DATES: Written comments and recommendations on the.... Title: Dependents' Educational Assistance (DEA) Election Request, VA Form Letter 22-909. OMB Control...

  3. 78 FR 17778 - Proposed Information Collection (Dependents' Educational Assistance (DEA) Election Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... (Dependents' Educational Assistance (DEA) Election Request) Activity: Comment Request AGENCY: Veterans... veterans beginning date to start their DEA benefits. DATES: Written comments and recommendations on the.... Title: Dependents' Educational Assistance (DEA) Election Request, VA Form Letter 22-909. OMB Control...

  4. 5 CFR 831.651 - Commencing and terminating dates of survivor annuities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the day after death of the employee, Member, or retiree. (b)(1) A current spouse annuity begins to...) For annuities under § 831.683, on the later of the day after date of death of the retiree or the first... States Code, on the later of the day after the date of death of the employee, Member, or retiree or the...

  5. 5 CFR 831.651 - Commencing and terminating dates of survivor annuities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the day after death of the employee, Member, or retiree. (b)(1) A current spouse annuity begins to...) For annuities under § 831.683, on the later of the day after date of death of the retiree or the first... States Code, on the later of the day after the date of death of the employee, Member, or retiree or the...

  6. 5 CFR 831.651 - Commencing and terminating dates of survivor annuities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the day after death of the employee, Member, or retiree. (b)(1) A current spouse annuity begins to...) For annuities under § 831.683, on the later of the day after date of death of the retiree or the first... States Code, on the later of the day after the date of death of the employee, Member, or retiree or the...

  7. 5 CFR 831.651 - Commencing and terminating dates of survivor annuities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the day after death of the employee, Member, or retiree. (b)(1) A current spouse annuity begins to...) For annuities under § 831.683, on the later of the day after date of death of the retiree or the first... States Code, on the later of the day after the date of death of the employee, Member, or retiree or the...

  8. 5 CFR 831.651 - Commencing and terminating dates of survivor annuities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the day after death of the employee, Member, or retiree. (b)(1) A current spouse annuity begins to...) For annuities under § 831.683, on the later of the day after date of death of the retiree or the first... States Code, on the later of the day after the date of death of the employee, Member, or retiree or the...

  9. Feasibility Study on Determining the Effect of Testing on Harpoon Missile System Reliability.

    DTIC Science & Technology

    1985-06-01

    or subassem- blies) failed and the date. Correlation between test date and calendar age is achieved by inservice date. Failure events are keyed to...acceptance test of the guidance section is used as the inservice event. ETH time recorded for each test is a cumulative time except for re-zeroing in...and testing environ- ments. The inservice date would correspond to the beginning of the retrieved test history at the final acceptance test of the

  10. 34 CFR 682.507 - Due diligence in collecting a loan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of this section, the borrower's delinquency begins on the day after the due date of an installment... knowledge, the delinquency begins 30 days after the day the lender receives notice that the borrower has... the due diligence procedures in § 682.411 in collecting a Federal GSL loan. (b) Initial delinquency...

  11. Faecal microbiota transplantation in 2013: developing human gut microbiota as a class of therapeutics.

    PubMed

    Khoruts, Alexander

    2014-02-01

    Although the idea of faecal transplantation dates back many decades, only with advances in scientific technologies can we begin systematic development of this new class of therapeutics. The primary focus remains on treatment of Clostridium difficile infection—new applications are beginning to emerge, but a long journey remains ahead.

  12. The Oxford Picture Dictionary. Beginning Workbook.

    ERIC Educational Resources Information Center

    Fuchs, Marjorie

    The beginning workbook of the Oxford Picture Dictionary is in full color and offers vocabulary reinforcement activities that correspond page for page with the dictionary. Clear and simple instructions with examples make it suitable for independent use in the classroom or at home. The workbook has up-to-date art and graphics, explaining over 3700…

  13. 20 CFR 218.27 - Vacation pay.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Vacation pay. 218.27 Section 218.27 Employees... Beginning Date § 218.27 Vacation pay. (a) From railroad employer. Vacation pay may be credited to the... vacation pay is credited to the vacation period, the annuity can begin no earlier than the day after the...

  14. 21 CFR 171.7 - Withdrawal of petition without prejudice.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Section 171.7 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES.... Upon refiling, the time limitation will begin to run anew from the date of refiling. (b) At any time... limitation will begin to run anew. (c) Any petitioner who has a food additive petition pending before the...

  15. 21 CFR 71.6 - Extension of time for studying petitions; substantive amendments; withdrawal of petitions without...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL COLOR ADDITIVE PETITIONS General... limitation will begin to run anew. If nonclinical laboratory studies are involved, additional information and... to a future filing. Upon refiling, the time limitation will begin to run anew from the date of...

  16. 21 CFR 171.7 - Withdrawal of petition without prejudice.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 171.7 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES.... Upon refiling, the time limitation will begin to run anew from the date of refiling. (b) At any time... limitation will begin to run anew. (c) Any petitioner who has a food additive petition pending before the...

  17. 14 CFR 1260.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... organized primarily for profit. Effective date means the date work can begin, which could be earlier or..., 26 U.S.C. 501. Progress report means a concise statement of work accomplished during the report... fabricated with grant funds by a recipient for the performance of work under its grant. Small business...

  18. 14 CFR 1260.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... organized primarily for profit. Effective date means the date work can begin, which could be earlier or..., 26 U.S.C. 501. Progress report means a concise statement of work accomplished during the report... fabricated with grant funds by a recipient for the performance of work under its grant. Small business...

  19. OIG News Release: EPA Office of Inspector General to provide ‘heads up’ on dates audit and evaluation reports will be issued

    EPA Pesticide Factsheets

    March 27, 2018. WASHINGTON – The U.S. Environmental Protection Agency’s Office of Inspector General (EPA OIG), beginning in April 2018, will announce in advance the dates it expects to issue most audit and evaluation reports.

  20. 7 CFR 1710.401 - Loan application documents.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., Checklist for Electric Loan Application, or a computer generated equivalent as this list. (1) Transmittal... beginning date of the loan period and shall be the same as the date on the Financial and Statistical Report... headquarters facilities, Form 740g need not be submitted. (5) Financial and statistical report. Distribution...

  1. 7 CFR 1710.401 - Loan application documents.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., Checklist for Electric Loan Application, or a computer generated equivalent as this list. (1) Transmittal... beginning date of the loan period and shall be the same as the date on the Financial and Statistical Report... headquarters facilities, Form 740g need not be submitted. (5) Financial and statistical report. Distribution...

  2. 7 CFR 1710.401 - Loan application documents.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., Checklist for Electric Loan Application, or a computer generated equivalent as this list. (1) Transmittal... beginning date of the loan period and shall be the same as the date on the Financial and Statistical Report... headquarters facilities, Form 740g need not be submitted. (5) Financial and statistical report. Distribution...

  3. Preserving temporal relations in clinical data while maintaining privacy

    PubMed Central

    Mirhaji, Parsa; Low, Alexander FH; Malin, Bradley A

    2016-01-01

    Objective Maintaining patient privacy is a challenge in large-scale observational research. To assist in reducing the risk of identifying study subjects through publicly available data, we introduce a method for obscuring date information for clinical events and patient characteristics. Methods The method, which we call Shift and Truncate (SANT), obscures date information to any desired granularity. Shift and Truncate first assigns each patient a random shift value, such that all dates in that patient’s record are shifted by that amount. Data are then truncated from the beginning and end of the data set. Results The data set can be proven to not disclose temporal information finer than the chosen granularity. Unlike previous strategies such as a simple shift, it remains robust to frequent – even daily – updates and robust to inferring dates at the beginning and end of date-shifted data sets. Time-of-day may be retained or obscured, depending on the goal and anticipated knowledge of the data recipient. Conclusions The method can be useful as a scientific approach for reducing re-identification risk under the Privacy Rule of the Health Insurance Portability and Accountability Act and may contribute to qualification for the Safe Harbor implementation. PMID:27013522

  4. Airborne pollen of Olea in five regions of Portugal.

    PubMed

    Ribeiro, Helena; Cunha, Mário; Abreu, Ilda

    2005-01-01

    The aim of this work was to study spatial and temporal distribution of Olea europeae airborne pollen in different Portuguese regions: Reguengos de Monsaraz (south); Bairrada (west); Braga (northwest); Valença do Douro and Foz Côa (north-east). Airborne pollen sampling was conducted from 1998-2003 using "Cour" type samplers located in each region. The main pollen season (MPS) of Olea lasted on average 36 days and occurred from late April until middle-to-end of June. During the studied period, inter-annual variations among and within regions, concerning the total annual pollen counts and the beginning, peak and ending dates of the MPS, were reported. Reguengos de Monsaraz and Bairrada registered the earliest MPS starting date, followed by Valença do Douro and Foz-Côa, and the latest date was verified in Braga that also had the shortest MPS. Reguengos de Monsaraz presented the longest MPS with the highest differences in the beginning and ending dates, but minimum differences in the dates of the maximum pollen peak. Our results showed an increase in the Olea annual pollen index, from north to south, and from the west to the east regions of the country.

  5. Establishment of revisit user fee program for Medicare survey and certification activities. Final rule.

    PubMed

    2007-09-19

    This final rule will establish a system of revisit user fees applicable to health care facilities that have been cited for deficiencies during initial certification, recertification, or substantiated complaint surveys and require a revisit to confirm that corrections to previously-identified deficiencies have been remedied. Consistent with the President's long-term goal to promote quality of health care and to cut the deficit in half by fiscal year (FY) 2009, the FY 2007 Department of Health and Human Services' (HHS) budget request included both new mandatory savings proposals and a requirement that user fees be applied to health care providers that have failed to comply with Federal quality of care requirements. The "Revisit User Fees" will affect only those providers or suppliers for which a revisit is required to confirm that previously-identified failures to meet federal quality of care requirements have been remedied. The fees are estimated at $37.3 million annually and will recover the costs associated with the Medicare Survey and Certification program's revisit surveys. The fees will take effect on the date of publication of the final rule and will be in effect until the date that the continued authority provided by Congress expires. At the time of publication of this regulation the applicable date is September 30, 2007. If no legislation is enacted, the fees are not retroactive to the beginning of the fiscal year. Any provider or supplier that has a revisit survey conducted on or after the date of publication will be assessed a revisit user fee and will be notified of the assessment upon data system reconciliation which can occur following the closing of the fiscal year. The fees will be available to CMS until expended. The revisit user fee is included in the President's proposed FY 2008 budget. We note through the publication of this final rule that if authority for the revisit user fee is continued, we will use the current fee schedule in this rule for the assessment of such fees until such time as a new fee schedule notice is proposed and published in final form.

  6. KSC-97PC1349

    NASA Image and Video Library

    1997-09-07

    Workers in the Payload Hazardous Servicing Facility (PHSF) begin to remove a protective cover from the Cassini spacecraft with its attached Huygens probe. Damage to thermal insulation was discovered inside Huygens from an abnormally high flow of conditioned air. Further internal inspection, insulation repair and a cleaning of the probe are now required. Mission managers are targeting a mid-October launch date after Cassini returns to the pad and is once again placed atop its Titan IVB expendable launch vehicle at Launch Pad 40 at Cape Canaveral Air Station. Cassini will explore the Saturnian system, including the planet’s rings, while the Huygens probe will explore the moon Titan

  7. 42 CFR 422.318 - Special rules for coverage that begins or ends during an inpatient hospital stay.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Coverage that begins during an inpatient stay. If coverage under an MA plan offered by an MA organization... previous MA organization or original Medicare, as appropriate; (2) The MA organization offering the newly-elected MA plan is not responsible for the inpatient services until the date after the beneficiary's...

  8. 42 CFR 422.318 - Special rules for coverage that begins or ends during an inpatient hospital stay.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Coverage that begins during an inpatient stay. If coverage under an MA plan offered by an MA organization... previous MA organization or original Medicare, as appropriate; (2) The MA organization offering the newly-elected MA plan is not responsible for the inpatient services until the date after the beneficiary's...

  9. 75 FR 41818 - Gulf of Mexico Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... Education Advisory Panel (AP). DATES: The Outreach and Education AP meeting is scheduled to begin at 8:30 a... Education AP will begin the development of a five-year strategic plan, and may provide recommendations to the Council. Although other non-emergency issues not on the agenda may come before the Outreach and...

  10. 75 FR 2488 - Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... to the public. DATES: The Joint Canada-U.S. Review Panel will be held beginning at 9 a.m., Monday, February 8, 2010 and will continue through Wednesday, February 10, 2010. The meetings will begin at 9 a.m. and end at 5:30 p.m. each day or until business for each day is completed. [[Page 2489

  11. 20 CFR 218.28 - Sick pay.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Sick pay. 218.28 Section 218.28 Employees... Beginning Date § 218.28 Sick pay. (a) From railroad employer. If the employee is carried on the payroll while sick, the annuity can begin no earlier than the day after the last day of sick pay. However, sick...

  12. 14 CFR 1261.103 - Time limitations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or 2 years after the war or armed conflict is terminated, whichever is earlier. The dates of beginning and ending of such an armed conflict are the dates established by concurrent resolution of the... claim accrues in time of war or if an armed conflict intervenes within 2 years after it accrues, and if...

  13. 40 CFR 63.152 - General reporting and continuous records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...

  14. 40 CFR 63.152 - General reporting and continuous records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...

  15. 40 CFR 63.152 - General reporting and continuous records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...

  16. 40 CFR 63.152 - General reporting and continuous records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...

  17. 40 CFR 63.152 - General reporting and continuous records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... submitted semiannually no later than 60 calendar days after the end of each 6-month period. The first report... and shall cover the 6-month period beginning on the date the Notification of Compliance Status is due... quarterly. The first semiannual period is the 6-month period starting the date the Notification of...

  18. Tangrams: Puzzles of Art

    ERIC Educational Resources Information Center

    Fee, Brenda

    2009-01-01

    Challenging one's brain is the beginning of making great art. Tangrams are a great way to keep students thinking about their latest art project long after leaving the classroom. A tangram is a Chinese puzzle. The earliest known reference to tangrams appears in a Chinese book dated 1813, but the puzzles existed long before that date. The puzzle…

  19. A Qualitative Analysis of College Women's Leaving Processes in Abusive Relationships

    ERIC Educational Resources Information Center

    Edwards, Katie M.; Murphy, Megan J.; Tansill, Erin C.; Myrick, Christina; Probst, Danielle R.; Corsa, Rebecca; Gidycz, Christine A.

    2012-01-01

    Objective: This study assessed the process of leaving an abusive dating relationship utilizing a qualitative design. Methods: Participants included 123 college women in abusive dating relationships who participated at the beginning and end of a 10-week academic quarter. Results: Qualitative content analyses were used to analyze the transcribed…

  20. 77 FR 75148 - Limitation of Duty-Free Imports of Apparel Articles Assembled in Haiti Under the Haitian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ... quantitative limit on certain apparel under HOPE. DATES: Effective Date: December 20, 2012. FOR FURTHER...-added program is subject to a quantitative limitation. HOPE provides that the quantitative limitation... beginning on December 20, 2012, the quantitative limitation for qualifying apparel imported from Haiti under...

  1. 78 FR 25307 - Investigations Regarding Eligibility To Apply for Worker Adjustment Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... begin and the subdivision of the firm involved. The petitioners or any other persons showing a... Date of Date of TA-W Subject firm (petitioners) Location institution petition 82618 Covidien, Formerly..., WA 04/05/13 04/03/13 Technology Infrastructure (State/One-Stop). 82630 Astromed, Inc. Grass Rockland...

  2. 75 FR 7440 - Notice of Idaho Panhandle Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Self-Determination Act of 2000 (Public Law 110-343) the Idaho Panhandle National Forest's Idaho... for a business meeting. The business meeting is open to the public. DATES: February 19, 2010... business meeting. The public forum begins at 11 a.m. Dated: February 10, 2010. Ranotta K. McNair, Forest...

  3. 26 CFR 1.1035-1 - Certain exchanges of insurance policies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... providing for regular payments beginning at a date not later than the date payments would have begun under... contract of life insurance for another contract of life insurance or for an endowment or annuity contract... exchange of an endowment contract or annuity contract for a life insurance contract, nor an annuity...

  4. 26 CFR 1.1035-1 - Certain exchanges of insurance policies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... endowment insurance providing for regular payments beginning at a date not later than the date payments... exchange of: (a) A contract of life insurance for another contract of life insurance or for an endowment or... transactions involving the exchange of an endowment contract or annuity contract for a life insurance contract...

  5. The Dash

    ERIC Educational Resources Information Center

    Buck, Marilyn

    2008-01-01

    Important events in our lives have a beginning and ending date with a dash in between. What is important is not the dates on either end but what the dash represents. The "dashes" of Amy Morris Homans and Barbara E. Forker are examined. Each touched the lives of their students and the profession that was their lives. Homans understood the…

  6. 5 CFR 550.806 - Interest computations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Interest computations. 550.806 Section... ADMINISTRATION (GENERAL) Back Pay § 550.806 Interest computations. (a)(1) Interest begins to accrue on the date...) Interest accrual ends at a time selected by the agency that is no more than 30 days before the date of the...

  7. 5 CFR 550.806 - Interest computations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Interest computations. 550.806 Section... ADMINISTRATION (GENERAL) Back Pay § 550.806 Interest computations. (a)(1) Interest begins to accrue on the date...) Interest accrual ends at a time selected by the agency that is no more than 30 days before the date of the...

  8. Minimum impulse trajectories for Mars round trip missions

    NASA Technical Reports Server (NTRS)

    Horvat, Glen M.; Alexander, Stephen W.

    1992-01-01

    Data are presented for minimum-impulse earth-Mars round-trip trajectories for the 2010 to 2027 Mars launch opportunities. Round-trip mission times from 120 to 600 days, including a 30-day rendezvous at Mars, for direct trajectories and trajectories utilizing a Venus gravitational assist are considered. Optimal planetary launch and arrival dates and total impulse requirements are based on all maneuvers being performed propulsively with no finite burn or other losses. Direct trajectories have the lowest impulse requirements for shorter mission times and Venus gravitational assist trajectories have the lowest impulse requirements for longer mission times. It is shown that one can depart on trajectories to Mars, beginning with lower energy trajectories to the moon. The fuel savings varies, depending on the final energy level required and on the swingby procedure used. Procedures discussed include single lunar swingbys, double-powered or unpowered lunar swingbys, third lunar flybys a year later, and gravity assists by Venus and earth after the final lunar swingby.

  9. AgRISTARS: Supporting research. Spring small grains planting date distribution model

    NASA Technical Reports Server (NTRS)

    Hodges, T.; Artley, J. A. (Principal Investigator)

    1981-01-01

    A model was developed using 996 planting dates at 51 LANDSAT segments for spring wheat and spring barley in Minnesota, Montana, North Dakota, and South Dakota in 1979. Daily maximum and minimum temperatures and precipitation were obtained from the cooperative weather stations nearest to each segment. The model uses a growing degree day summation modified for daily temperature range to estimate the beginning of planting and uses a soil surface wetness variable to estimate how a fixed number of planting days are distributed after planting begins. For 1979, the model predicts first, median, and last planting dates with root mean square errors of 7.91, 6.61, and 7.09 days, respectively. The model also provides three or four dates to represent periods of planting activity within the planting season. Although the full model was not tested on an independent data set, it may be suitable in areas other than the U.S. Great Plains where spring small grains are planted as soon as soil and air temperatures become warm enough in the spring for plant growth.

  10. 77 FR 51823 - Notice of Public Meeting; Central Montana Resource Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... Management (BLM) Central Montana Resource Advisory Council (RAC) will meet as indicated below. DATES: The meeting will be September 18-19, 2012. The September 18 meeting will begin at 10 a.m. with a 30-minute public comment period and will adjourn at 5:15 p.m. The September 19 meeting will begin at 8 a.m. with a...

  11. 20 CFR 702.222 - Claims; exceptions to time limitations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... representative. In the case of minor who has no guardian before he or she becomes of age, time begins to run from... damages in respect of an injury or death, or files a claim under a State workers' compensation act because... the Act, the time limitation in § 702.221 shall not begin to run until the date of termination of such...

  12. 78 FR 40764 - Notice of Intent To Amend the California Desert Conservation Area Plan for the Needles Field...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ... conveyed out of Federal ownership and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues. DATES: This notice initiates the public scoping process for... the 1980 CDCA Plan with an associated EA; announces the beginning of the scoping process; and seeks...

  13. 77 FR 60718 - Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... BLM is announcing the beginning of the scoping process to solicit public comments and identify issues. DATES: This notice initiates the public scoping process for the plan amendment with an associated EA... amendment with an associated EA for the 1980 CDCA Plan, announces the beginning of the scoping process, and...

  14. 75 FR 1447 - Petition for Exemption From the Vehicle Theft Prevention Standard; Hyundia-Kia America Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ...This document grants in full the petition of Hyundai-Kia Motors Corporation (HATCI) in accordance with Sec. 543.9(c)(2) of 49 CFR part 543, Exemption from the Theft Prevention Standard, for the Kia Amanti vehicle line beginning with model year (MY) 2009. This petition is granted because the agency has determined that the antitheft device to be placed on the line as standard equipment is likely to be as effective in reducing and deterring motor vehicle theft as compliance with the parts-marking requirements of the Theft Prevention Standard. HATCI requested confidential treatment for its information and attachments submitted in support of its petition. In a letter dated January 30, 2008, the agency denied HATCI's request for confidential treatment. Subsequently, HATCI requested reconsideration of the determination. In a letter dated September 25, 2008, the agency granted the petitioner's request for reconsideration of confidential treatment of the indicated areas of its petition.

  15. 40 CFR 63.2520 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... report and beginning and ending dates of the reporting period. (4) For each SSM during which excess... paragraphs (e)(5)(ii)(A) through (C) of this section. This includes periods of SSM. (A) The total operating... periods of SSM. (A) The date and time that each CMS was inoperative, except for zero (low-level) and high...

  16. 12 CFR 622.21 - Computing time.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... allowed by this subpart, the date of the act or event from which the designated period of time begins to... or Federal holiday, in which event the period shall run until the end of the next day which is not a... such service is made by mail, three days shall be added to the prescribed period from the date when the...

  17. 12 CFR 622.21 - Computing time.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... allowed by this subpart, the date of the act or event from which the designated period of time begins to... or Federal holiday, in which event the period shall run until the end of the next day which is not a... such service is made by mail, three days shall be added to the prescribed period from the date when the...

  18. 12 CFR 622.21 - Computing time.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... allowed by this subpart, the date of the act or event from which the designated period of time begins to... or Federal holiday, in which event the period shall run until the end of the next day which is not a... such service is made by mail, three days shall be added to the prescribed period from the date when the...

  19. 12 CFR 622.21 - Computing time.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... allowed by this subpart, the date of the act or event from which the designated period of time begins to... or Federal holiday, in which event the period shall run until the end of the next day which is not a... such service is made by mail, three days shall be added to the prescribed period from the date when the...

  20. 12 CFR 622.21 - Computing time.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... allowed by this subpart, the date of the act or event from which the designated period of time begins to... or Federal holiday, in which event the period shall run until the end of the next day which is not a... such service is made by mail, three days shall be added to the prescribed period from the date when the...

  1. 26 CFR 1.468B-9 - Disputed ownership funds.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... market value of the property on the date of transfer to the fund, and the fund's holding period begins on... is the fair market value of that property on the date of distribution. (ii) Denial of deduction. A... ownership fund will take a fair market value basis in the receivable and will not include the fair market...

  2. 26 CFR 1.468B-9 - Disputed ownership funds.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... market value of the property on the date of transfer to the fund, and the fund's holding period begins on... is the fair market value of that property on the date of distribution. (ii) Denial of deduction. A... ownership fund will take a fair market value basis in the receivable and will not include the fair market...

  3. 26 CFR 1.468B-9 - Disputed ownership funds.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... market value of the property on the date of transfer to the fund, and the fund's holding period begins on... is the fair market value of that property on the date of distribution. (ii) Denial of deduction. A... ownership fund will take a fair market value basis in the receivable and will not include the fair market...

  4. A Medieval Banquet in the Alhambra Palace.

    ERIC Educational Resources Information Center

    Shabbas, Audrey, Ed.

    This unit is designed to introduce students to the Islamic culture and civilization of the Middle Ages. The historical period which these materials cover begins with 711 (the date of Muslim entrance into Spain) and ends with 1492 (the date of the end of Muslim rule in Spain). The activities of the unit culminate with the recreation of a banquet…

  5. "Date with an Angel": A Non-Verbal Communication Teaching Tip.

    ERIC Educational Resources Information Center

    Long, Toni

    This paper presents a strategy for teaching non-verbal communication skills to students in high school or college. The strategy uses the movie "Date with an Angel" to teach the non-verbal skills. According to the paper, the activity can be used at the beginning of a unit or course to get the students interested in important…

  6. 45 CFR 506.10 - “Vietnam conflict” defined.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false âVietnam conflictâ defined. 506.10 Section 506.10... § 506.10 “Vietnam conflict” defined. Vietnam conflict refers to the period beginning February 28, 1961... proclaimed the date of May 7, 1975, to be the ending date of the “Vietnam era” (Presidential Proclamation No...

  7. 45 CFR 506.10 - “Vietnam conflict” defined.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false âVietnam conflictâ defined. 506.10 Section 506.10... § 506.10 “Vietnam conflict” defined. Vietnam conflict refers to the period beginning February 28, 1961... proclaimed the date of May 7, 1975, to be the ending date of the “Vietnam era” (Presidential Proclamation No...

  8. 45 CFR 506.10 - “Vietnam conflict” defined.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false âVietnam conflictâ defined. 506.10 Section 506.10... § 506.10 “Vietnam conflict” defined. Vietnam conflict refers to the period beginning February 28, 1961... proclaimed the date of May 7, 1975, to be the ending date of the “Vietnam era” (Presidential Proclamation No...

  9. 45 CFR 506.10 - “Vietnam conflict” defined.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false âVietnam conflictâ defined. 506.10 Section 506.10... § 506.10 “Vietnam conflict” defined. Vietnam conflict refers to the period beginning February 28, 1961... proclaimed the date of May 7, 1975, to be the ending date of the “Vietnam era” (Presidential Proclamation No...

  10. 75 FR 54076 - National Flood Insurance Program, Policy Wording Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... Standard Flood Insurance Policy by adding in two unintentionally omitted words. DATES: Comments must be... 44 CFR until the final rule's effective date of December 31, 2000. The words ``Coverage for'' do not... paragraph by adding the words ``Coverage for'' at the beginning of 44 CFR part 61 Appendix A(2) III.B.4...

  11. 48 CFR 731.205-70 - Overseas recruitment incentive.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... services; and does not exceed 10% of the base salary of the employee from date of arrival at overseas post to begin assignment to date of departure from post at the end of assignment. ORI is to be paid as a... exemption. (b) In the event that an employee subsequently receives a section 911 exclusion for any part of...

  12. Crew-Centered Operations: What HAL 9000 Should Have Been

    NASA Technical Reports Server (NTRS)

    Korsmeyer, David J.; Clancy, Daniel J.; Crawford, James M.; Drummond, Mark E.

    2005-01-01

    To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.

  13. The Timing of Pertussis Cases in Unvaccinated Children in an Outbreak Year: Oregon 2012.

    PubMed

    Robison, Steve G; Liko, Juventila

    2017-04-01

    To assess whether, during a 2012 pertussis outbreak, unvaccinated and poorly vaccinated cases occurred earlier on a community level. Pediatric pertussis among children 2 months to 10 years of age in the Oregon Sentinel Surveillance region during an epidemic starting at the beginning of 2012 were stratified by immunization status, age, zip code, and calendar date of disease onset. Differences in median onset as days between fully or mostly vaccinated, poorly vaccinated, and unvaccinated cases were examined overall and within local zip code areas. Disease clusters also were examined using SatScan analysis. Overall, 351 pertussis cases occurred among children aged 2 months to 10 years of age residing in 72 distinct zipcodes. Among unvaccinated or poorly vaccinated cases, their median date of onset was at calendar day 117 (April 26, 2012), whereas for those who were fully or mostly vaccinated the median date of onset was 41 days later, at day 158 (June 6, 2012). Within each local zip code area, the unvaccinated cases were 3.2 times more likely than vaccinated cases to have earlier median dates of onset (95% CI 2.9-3.6). In this outbreak, pertussis cases among unvaccinated children represented an earlier spread of disease across local areas. Controlling outbreaks may require attention to the composition and location of the unvaccinated. Copyright © 2016 Elsevier Inc. All rights reserved.

  14. Considerations for the definition, measurement, consequences, and prevention of dating violence victimization among adolescent girls.

    PubMed

    Teten, Andra L; Ball, Barbara; Valle, Linda Anne; Noonan, Rita; Rosenbluth, Barri

    2009-07-01

    Violence experienced by adolescent girls from their dating partners poses considerable threat to their health and well-being. This report provides an overview of the prevalence and consequences of heterosexual teen dating violence and highlights the need for comprehensive prevention approaches to dating violence. We also discuss some considerations and future directions for the study and prevention of dating violence. We begin with a discussion of the definition of dating violence and also discuss measurement concerns and the need for evaluation of prevention strategies. Although women and men of all ages may be the victims or perpetrators, male-to-female dating violence experienced by adolescent girls is the main focus of this article. We incorporate research regarding girls' perpetration of dating violence where appropriate and as it relates to prevention.

  15. Medicine as combining natural and human science.

    PubMed

    Dreyfus, Hubert L

    2011-08-01

    Medicine is unique in being a combination of natural science and human science in which both are essential. Therefore, in order to make sense of medical practice, we need to begin by drawing a clear distinction between the natural and the human sciences. In this paper, I try to bring the old distinction between the Geistes and Naturwissenschaften up to date by defending the essential difference between a realist explanatory theoretical study of nature including the body in which the scientist discovers the causal properties of natural kinds and the interpretive understanding of human beings as embodied agents which, as Charles Taylor has convincingly argued, requires a hermeneutic account of self-interpreting human practices.

  16. 40 CFR 80.500 - What are the implementation dates for the motor vehicle diesel fuel sulfur control program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the motor vehicle diesel fuel sulfur control program? 80.500 Section 80.500 Protection of Environment... Information § 80.500 What are the implementation dates for the motor vehicle diesel fuel sulfur control... sulfur content standard in § 80.520(c). (1) Beginning June 1, 2006, the sulfur content standard of § 80...

  17. How to Tell Friends and Dates about Epilepsy

    ERIC Educational Resources Information Center

    Mittan, Robert J.

    2009-01-01

    Friendships take some time to develop. It is important to give that development a chance to begin. The time to talk about epilepsy is when one has succeeded in establishing an early friendship and when one is able to talk with each other about things deeper than the weather, fashions, or sports. In dating, trust is even more important than in…

  18. An Examination and Review of the Collection Development Policies and Procedures of the Mesa College Library.

    ERIC Educational Resources Information Center

    Connaway, Lynn Silipigni

    This report on a study of the acquisition policies and procedures of the Mesa College Library (Grand Junction, Colorado) begins by discussing the techniques used for data collection, including: (1) measurement of shelflist cards; (2) calculation of average imprint date, accession date, number of circulations, price, and year of latest circulation;…

  19. 75 FR 57696 - Change to FMCSA Policy on Calculating and Publicizing the Driver, Vehicle, and Hazardous...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... document revises the date used to calculate the threshold crash and OOS rates, from calendar year cycles to fiscal year cycles, from October 1 of a given year to September 30 of the following year. This will... determine HMSP eligibility, before the motor carrier HMSP registration cycle begins on January 1. DATES...

  20. 40 CFR 80.500 - What are the implementation dates for the motor vehicle diesel fuel sulfur control program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the motor vehicle diesel fuel sulfur control program? 80.500 Section 80.500 Protection of Environment... Information § 80.500 What are the implementation dates for the motor vehicle diesel fuel sulfur control... sulfur content standard in § 80.520(c). (1) Beginning June 1, 2006, the sulfur content standard of § 80...

  1. When the Due Date Is Not the "Do" Date!

    ERIC Educational Resources Information Center

    Mastrianni, Theresa M.

    2015-01-01

    Our students consistently hand in assignments late, or complete them at the last minute. Why is it that they know about assignments all term long yet only begin them the night before the assignment is due? Based on a career-focused learning community at Kingsborough Community College of the City University of New York, this article looks at ways…

  2. Galileo spacecraft power management and distribution system

    NASA Technical Reports Server (NTRS)

    Detwiler, R. C.; Smith, R. L.

    1990-01-01

    The Galileo PMAD (power management and distribution system) is described, and the design drivers that established the final as-built hardware are discussed. The spacecraft is powered by two general-purpose heat-source-radioisotope thermoelectric generators. Power bus regulation is provided by a shunt regulator. Galileo PMAD distributes a 570-W beginning of mission (BOM) power source to a user complement of some 137 load elements. Extensive use of pyrotechnics requires two pyro switching subassemblies. They initiate 148 squibs which operate the 47 pyro devices on the spacecraft. Detection and correction of faults in the Galileo PMAD is an autonomous feature dictated by requirements for long life and reliability in the absence of ground-based support. Volatile computer memories in the spacecraft command and data system and attitude control system require a continuous source of backup power during all anticipated power bus fault scenarios. Power for the Jupiter Probe is conditioned, isolated, and controlled by a Probe interface subassembly. Flight performance of the spacecraft and the PMAD has been successful to date, with no major anomalies.

  3. Travel immunization update for older adults.

    PubMed

    Spain, Margaret P; Edlund, Barbara J

    2010-04-01

    Older Americans are among the most widely traveled group in our society. Recent trends point to more international travel, more travel to Third World countries, and more travel by older adults with significant health problems. Regardless of the reason for travel, older adults need to plan for healthy travel. Primary care providers need to inquire at routine visits if patients have plans for international travel. If travel to other countries or regions is being considered, patients must be advised of the importance of early travel preparation. To begin with, older adults should be up to date on all routine immunizations. Those planning on international travel may need additional required and/or recommended immunizations, depending on the individual's health status, travel itinerary, length of stay, and health risks associated with destination sites. Primary care providers should be knowledgeable about travel medicine resources in the community to make referrals for travelers requiring additional immunizations and health information. Copyright 2010, SLACK Incorporated.

  4. "It's Just Like Learning, Only Fun"--A Teacher's Perspective of Empirically Validating Effectiveness of a Math App

    ERIC Educational Resources Information Center

    Grimes, Ka Rene

    2014-01-01

    The purpose of this paper is to provide a narrative of work in progress to validate a math app designed for number sense. To date I have conducted classroom research and pilot studies across ten early childhood classrooms in two schools and will begin an empirical study at the beginning of the 2014-2015 school year. Through my work I believe the…

  5. 31 CFR 351.26 - What are the interest rates and redemption values for bonds with issue dates from May 1, 1995...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false What are the interest rates and... periods that begin 5 years or more after issue date? 351.26 Section 351.26 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE...

  6. 78 FR 1130 - Domestic Dates Produced or Packed in Riverside County, CA; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... issued in past years; and (4) this interim final rule provides a 60-day comment period, and all comments... (Committee) for the 2012-13 and subsequent crop years from $1.00 to $0.90 per hundredweight of dates handled... reasonable and necessary expenses of the program. The crop year begins October 1 and ends September 30. The...

  7. 26 CFR 1.148-4 - Yield on an issue of bonds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... this date. Interest is payable on January 1 of each year at a rate of 6.0000 percent per year on the.... BondY bears interest at 6 percent per year and matures on January 1, 2002. Bond Z bears interest at 7... redemption on January 1 of each year, beginning January 1, 2001. On each sinking fund redemption date, one of...

  8. 26 CFR 1.148-4 - Yield on an issue of bonds.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... this date. Interest is payable on January 1 of each year at a rate of 6.0000 percent per year on the.... BondY bears interest at 6 percent per year and matures on January 1, 2002. Bond Z bears interest at 7... redemption on January 1 of each year, beginning January 1, 2001. On each sinking fund redemption date, one of...

  9. 26 CFR 1.148-4 - Yield on an issue of bonds.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... this date. Interest is payable on January 1 of each year at a rate of 6.0000 percent per year on the.... BondY bears interest at 6 percent per year and matures on January 1, 2002. Bond Z bears interest at 7... redemption on January 1 of each year, beginning January 1, 2001. On each sinking fund redemption date, one of...

  10. Conceptual design studies of the 5 m terahertz antenna for Dome A, Antarctica

    NASA Astrophysics Data System (ADS)

    Yang, Ji; Zuo, Ying-Xi; Lou, Zheng; Cheng, Jing-Quan; Zhang, Qi-Zhou; Shi, Sheng-Cai; Huang, Jia-Sheng; Yao, Qi-Jun; Wang, Zhong

    2013-12-01

    As the highest, coldest and driest place in Antarctica, Dome A provides exceptionally good observing conditions for ground-based observations over terahertz wavebands. The 5 m Dome A Terahertz Explorer (DATE5) has been proposed to explore new terahertz windows, primarily over wavelengths between 350 and 200 μm. DATE5 will be an open-air, fully-steerable telescope that can function by unmanned operation with remote control. The telescope will be able to endure the harsh polar environment, including high altitude, very low temperature and very low air pressure. The unique specifications, including high accuracies for surface shape and pointing and fully automatic year-around remote operation, along with a stringent limit on the periods of on-site assembly, testing and maintenance, bring a number of challenges to the design, construction, assembly and operation of this telescope. This paper introduces general concepts related to the design of the DATE5 antenna. Beginning from an overview of the environmental and operational limitations, the design specifications and requirements of the DATE5 antenna are listed. From these, major aspects on the conceptual design studies, including the antenna optics, the backup structure, the panels, the subreflector, the mounting and the antenna base structure, are explained. Some critical issues of performance are justified through analyses that use computational fluid dynamics, thermal analysis and de-icing studies, and the proposed approaches for test operation and on-site assembly. Based on these studies, we conclude that the specifications of the DATE5 antenna can generally be met by using enhanced technological approaches.

  11. 40 CFR 87.20 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Exhaust Emissions (New Aircraft Gas Turbine Engines) § 87.20 Applicability. The provisions of this subpart are applicable to all aircraft gas turbine engines of the classes specified beginning on the dates...

  12. 50 CFR 665.644 - Notifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... approximate date and the approximate time at which spiny and slipper lobsters will be landed. (2) Report, not... of spiny and slipper lobsters will begin. (b) The Regional Administrator will notify permit holders...

  13. 50 CFR 665.644 - Notifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approximate date and the approximate time at which spiny and slipper lobsters will be landed. (2) Report, not... of spiny and slipper lobsters will begin. (b) The Regional Administrator will notify permit holders...

  14. Patterns of Change in Adolescent Dating Victimization and Aggression During Middle School.

    PubMed

    Goncy, Elizabeth A; Farrell, Albert D; Sullivan, Terri N

    2018-03-01

    Although mounting evidence suggests dating victimization and aggression begin in early adolescence, little work has examined the pattern of these behaviors across this age. This longitudinal study examined trajectories of dating victimization and aggression across middle school using 12 waves of data. A sample of early adolescents (N = 1369, 52.3% girls; 83% African American; 15% Hispanic or Latino) residing in an urban, economically disadvantaged area participated in this study. Youth completed measures of dating victimization and aggression quarterly across the 3 years of middle school. Although results indicated a general trend of increasing dating victimization and aggression across middle school, variation existed for boys and girls. Specifically, girls showed increasing patterns of both, whereas boys remained relatively stable across time. Dating victimization and aggression were also highly correlated across time. These findings support the implementation and refinement of prevention programming aimed at preventing and reducing dating aggression and victimization in middle school.

  15. 50 CFR 665.144 - Notifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... date and the approximate time at which spiny and slipper lobsters will be landed. (2) Report, not less... spiny and slipper lobsters will begin. (b) The Regional Administrator will notify permit holders of any...

  16. 50 CFR 665.144 - Notifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... date and the approximate time at which spiny and slipper lobsters will be landed. (2) Report, not less... spiny and slipper lobsters will begin. (b) The Regional Administrator will notify permit holders of any...

  17. 5 CFR 315.401 - Reinstatement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... separation. This time limit begins to run from the date of separation from the last position in which the... period; (10) Periods of nonemployement during which a person is eligible for injury compensation under...

  18. 26 CFR 1.441-2 - Election of taxable year consisting of 52-53 weeks.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... For this purpose, a 52-53-week taxable year beginning on any of the days from June 25 to July 4... day of the week; and (iii) Ends always on— (A) Whatever date this same day of the week last occurs in a calendar month; or (B) Whatever date this same day of the week falls that is the nearest to the...

  19. 26 CFR 1.441-2 - Election of taxable year consisting of 52-53 weeks.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... For this purpose, a 52-53-week taxable year beginning on any of the days from June 25 to July 4... always on the same day of the week; and (iii) Ends always on— (A) Whatever date this same day of the week last occurs in a calendar month; or (B) Whatever date this same day of the week falls that is the...

  20. [Variability of vegetation growth season in different latitudinal zones of North China: a monitoring by NOAA NDVI and MSAVI].

    PubMed

    Wang, Hong; Li, Xiaobing; Han, Ruibo; Ge, Yongqin

    2006-12-01

    In this study, North China was latitudinally divided into five zones, i.e., 32 degrees - 36 degrees N (Zone I), 36 degrees - 40 degrees N (Zone II), 40 degrees - 44 degrees N (Zone III), 44 degrees - 48 degrees N (Zone IV) and 48 degrees - 52 degrees N (Zone V), and the NOAA/ AVHRR NDVI and MSAVI time-series images from 1982 to 1999 were smoothed with Savitzky-Golay filter algorithm. Based on the EOF analysis, the principal components of NDVI and MSAVI for the vegetations in different latitudinal zones of North China were extracted, the annual beginning and ending dates and the length of growth season in 1982 - 1999 were estimated, and the related parameters were linearly fitted, aimed to analyze the variability of vegetation growth season. The results showed that the beginning date of the growth season in different zones tended to be advanced, while the ending date tended to be postponed with increasing latitude. The length of the growth season was also prolonged, with the prolonging time exceeded 10 days.

  1. 77 FR 43047 - Modoc County Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ...; or Resource Advisory Coordinator, Stephen Riley at (530) 233-8705. SUPPLEMENTARY INFORMATION: The... also be set aside for public comments at the beginning of the meeting. Dated: July 16, 2012. Kimberly H...

  2. 7 CFR 1416.102 - Eligible livestock and producers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... or deer; (2) Been physically located in an eligible county on the beginning date of the disaster... roaming animals or animals used for recreational purposes, such as pleasure, hunting, pets, or for show...

  3. 7 CFR 1416.102 - Eligible livestock and producers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... or deer; (2) Been physically located in an eligible county on the beginning date of the disaster... roaming animals or animals used for recreational purposes, such as pleasure, hunting, pets, or for show...

  4. 7 CFR 1416.102 - Eligible livestock and producers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... or deer; (2) Been physically located in an eligible county on the beginning date of the disaster... roaming animals or animals used for recreational purposes, such as pleasure, hunting, pets, or for show...

  5. Light Weapons and Intrastate Conflict, Early Warning Factors and Preventive Action. A Report to the Carnegie Commission on Preventing Deadly Conflict,

    DTIC Science & Technology

    1998-07-01

    x. BACKGROUND , RECENT EXPERIENCE, AND THE BEGINNINGS 13 OF INTERNATIONAL ACTION Background , 13 Codifying and Illustrating the Experience to Date...are proposed for preventive action at the national, regional, and international level. BACKGROUND , RECENT EXPERIENCE, AND THE BEGINNINGS OF...the nature of such conflict, and most important, the types and modes of acquisition of the weapons now used in this type of conflict. BACKGROUND

  6. Teen dating abuse: recognition and interventions.

    PubMed

    Freeman, Sally Ann; Rosenbluth, Barri; Cotton, Laura

    2013-03-01

    Teen dating abuse, also known as teen dating violence, is a significant public health issue. Adolescents with a history of dating abuse may struggle academically and experience increased risk for serious injury or even death. They may engage in risky sexual behavior, substance abuse, and unhealthy dieting and exhibit suicidal behaviors. School nurses may be the first adults that teens confide in when experiencing dating abuse and may lack the knowledge and skills to intervene with teens involved in unhealthy dating relationships. Beginning in 2008, Dell Children s Medical Center in Austin, Texas, partnered with SafePlace (a local nonprofit that serves survivors of sexual and domestic violence) to address dating abuse. This collaboration is part of Start Strong Austin, one of 11 communities nationwide participating in the Start Strong: Building Healthy Teen Relationships Initiative funded by the Robert Wood Johnson Foundation. The Start Strong model employs innovative strategies in education, community engagement, policy change, and social marketing to prevent dating abuse before it starts.

  7. 7 CFR 457.173 - Florida Avocado crop insurance provisions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a diameter of at least four inches. Crop year. A period beginning with the date insurance attaches... season after set out; and (2) Produced the minimum production per acre as specified in the Special...

  8. 77 FR 2039 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... the Renaissance Hotel in Seattle, WA. DATES: The Council will begin its plenary session at 8 a.m. on... at the Renaissance Hotel, 515 Madison Street, Seattle, WA. Council address: North Pacific Fishery...

  9. 42 CFR 423.504 - General provisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., beginning on the date the entity notified CMS of the intention to non-renew the most recent previous... inspect any books, contracts, and records of the Part D plan sponsor that pertain to— (A) The ability of...

  10. Geologic Time.

    ERIC Educational Resources Information Center

    Albritton, Claude C., Jr.

    1984-01-01

    Discusses the historical development of the concept of geologic time. Develops the topic by using the major discoveries of geologists, beginning with Steno and following through to the discovery and use of radiometric dating. An extensive reference list is provided. (JM)

  11. On statistical irregularity of stratospheric warming occurrence during northern winters

    NASA Astrophysics Data System (ADS)

    Savenkova, Elena N.; Gavrilov, Nikolai M.; Pogoreltsev, Alexander I.

    2017-10-01

    Statistical analysis of dates of warming events observed during the years 1981-2016 at different stratospheric altitudes reveals their non-uniform distributions during northern winter months with maxima at the beginning of January, at the end of January - beginning of February and at the end of February. Climatology of zonal-mean zonal wind, deviations of temperature from its winter-averaged values, and planetary wave (PW) characteristics at high and middle northern latitudes in the altitude range from the ground up to 60 km is studied using the database of meteorological reanalysis MERRA. Climatological temperature deviations averaged over the 60-90°N latitudinal bands reveal cooler and warmer layers descending due to seasonal changes during the polar night. PW amplitudes and upward Eliassen-Palm fluxes averaged over 36 years have periodical maxima with the main maximum at the beginning of January at altitudes 40-50 km. During the above-mentioned intervals of more frequent occurrence of stratospheric warming events, maxima of PW amplitudes and Eliassen-Palm fluxes, also minima of eastward winds in the high-latitude northern stratosphere have been found. Climatological intra-seasonal irregularities of stratospheric warming dates could indicate reiterating phases of stratospheric vacillations in different years.

  12. Beginning of grain harvest in the tri-border region Basel as a proxy for mean April - May temperatures; creation of a long Swiss series c. 1455 AD - 1950 AD

    NASA Astrophysics Data System (ADS)

    Wetter, Oliver; Pfister, Christian

    2010-05-01

    Beginning of grain harvest in the tri-border region Basel as a proxy for mean April-July temperatures; creation of a long Swiss series c. 1454 AD - 1950 AD O. Wetter and C. Pfister Section of Economic, Social and Environmental History, Institute of History, University of Bern, Bern, Switzerland (oliver.wetter@hist.unibe.ch) Before agricultural harvesting machines replaced manual labour the date of the grain harvest was largely dependent on mean temperatures from spring to early summer. It thus constitutes a very valuable source of information to reconstruct these temperatures. The later the harvest began, the cooler spring and early summer must have been and vice versa. For this reconstruction a new data series of grain harvests in the tri-border region Basel (representative for north-west Switzerland, the Alsace (France) and south-west Germany) was used as a temperature proxy. The harvesting dates have been extracted from the account books of the hospital of Basel which cover the period from c.1454 AD to 1705 AD. This series could be completed with several series of grain tithe dates originating from the Swiss Midland, covering the period between 1557 and 1825 and several grain harvest dates series covering the time between 1825 and 1950. Thus a series of almost 500 years could be compiled. Since the method of harvesting remained unchanged until the 1950's when manual labour was replaced by machines, the harvest dates of the modern series, lying within the temperature measurement series, could be used for calibrating the medieval dates.

  13. 78 FR 11632 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... and hearing on March 14, 2013, at the Amarillo Civic Center, 401 S. Buchanan Street, Amarillo, Texas... tornados, has been moved from the end of Session I to the beginning of Session II. The date and place of...

  14. 14 CFR 16.17 - Computation of time.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... applicable statute. (a) The date of an act, event, or default, after which a designated time period begins to... certified mail, 5 days shall be added to the prescribed period. [Doc. No. 27783, 61 FR 54004, October 16...

  15. 20 CFR 220.105 - Initial evaluation of a previous disability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  16. 20 CFR 220.105 - Initial evaluation of a previous disability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  17. 20 CFR 220.105 - Initial evaluation of a previous disability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  18. 20 CFR 220.105 - Initial evaluation of a previous disability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  19. 20 CFR 220.105 - Initial evaluation of a previous disability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  20. 36 CFR 1254.94 - What must my request include?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... copying project will take; the date that you would like to begin the project; and the number of persons... images on the microfilm are legible, and that the microfilm is properly processed. At a minimum, the...

  1. 76 FR 71321 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    ... public meetings, December 5-13, 2011 at the Anchorage Hilton Hotel. DATES: The Council will begin its... sessions. ADDRESSES: The meetings will be held at the Hilton Hotel, 500 West Third Avenue, Anchorage, AK...

  2. Knowledge-based decision support for Space Station assembly sequence planning

    NASA Astrophysics Data System (ADS)

    1991-04-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  3. Knowledge-based decision support for Space Station assembly sequence planning

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

  4. State and Local Intelligence Fusion Centers: An Evaluative Approach in Modeling a State Fusion Center

    DTIC Science & Technology

    2005-09-01

    appropriate use and dissemination. When information begins to flow in both directions, national and local entities can benefit from the developing...Linc Radios • Cell Phones • Laptops 88 4. The various systems, both traditional and “high-tech,” used by GISAC to disseminate terrorism...1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE September 2005 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE: State

  5. The spread of modern humans in Europe

    PubMed Central

    Hoffecker, John F.

    2009-01-01

    The earliest credible evidence of Homo sapiens in Europe is an archaeological proxy in the form of several artifact assemblages (Bohunician) found in South-Central and possibly Eastern Europe, dating to ≤48,000 calibrated radiocarbon years before present (cal BP). They are similar to assemblages probably made by modern humans in the Levant (Emiran) at an earlier date and apparently represent a population movement into the Balkans during a warm climate interval [Greenland Interstadial 12 (GI 12)]. A second population movement may be represented by a diverse set of artifact assemblages (sometimes termed Proto-Aurignacian) found in the Balkans, parts of Southwest Europe, and probably in Eastern Europe, and dating to several brief interstadials (GI 11–GI 9) that preceded the beginning of cold Heinrich Event 4 (HE4) (≈40,000 cal BP). They are similar to contemporaneous assemblages made by modern humans in the Levant (Ahmarian). The earliest known human skeletal remains in Europe that may be unequivocally assigned to H. sapiens (Peçstera cu Oase, Romania) date to this time period (≈42,000 cal BP) but are not associated with artifacts. After the Campanian Ignimbrite volcanic eruption (40,000 cal BP) and the beginning of HE4, artifact assemblages assigned to the classic Aurignacian, an industry associated with modern human skeletal remains that seems to have developed in Europe, spread throughout the continent. PMID:19571003

  6. Growth, chamber building rate and reproduction time of Palaeonummulites venosus under natural conditions.

    NASA Astrophysics Data System (ADS)

    Kinoshita, Shunichi; Eder, Wolfgang; Wöger, Julia; Hohenegger, Johann; Briguglio, Antonino

    2017-04-01

    Investigations on Palaeonummulites venosus using the natural laboratory approach for determining chamber building rate, test diameter increase rate, reproduction time and longevity is based on the decomposition of monthly obtained frequency distributions based on chamber number and test diameter into normal-distributed components. The shift of the component parameters 'mean' and 'standard deviation' during the investigation period of 15 months was used to calculate Michaelis-Menten functions applied to estimate the averaged chamber building rate and diameter increase rate under natural conditions. The individual dates of birth were estimated using the inverse averaged chamber building rate and the inverse diameter increase rate fitted by the individual chamber number or the individual test diameter at the sampling date. Distributions of frequencies and densities (i.e. frequency divided by sediment weight) based on chamber building rate and diameter increase rate resulted both in a continuous reproduction through the year with two peaks, the stronger in May /June determined as the beginning of the summer generation (generation1) and the weaker in November determined as the beginning of the winter generation (generation 2). This reproduction scheme explains the existence of small and large specimens in the same sample. Longevity, calculated as the maximum difference in days between the individual's birth date and the sampling date seems to be round about one year, obtained by both estimations based on the chamber building rate and the diameter increase rate.

  7. Preparing Historically Underserved Students for STEM Careers: The Role of an Inquiry-based High School Science Sequence Beginning with Physics

    NASA Astrophysics Data System (ADS)

    Bridges, Jon P.

    Improving the STEM readiness of students from historically underserved groups is a moral and economic imperative requiring greater attention and effort than has been shown to date. The current literature suggests a high school science sequence beginning with physics and centered on developing conceptual understanding, using inquiry labs and modeling to allow students to explore new ideas, and addressing and correcting student misconceptions can increase student interest in and preparation for STEM careers. The purpose of this study was to determine if the science college readiness of historically underserved students can be improved by implementing an inquiry-based high school science sequence comprised of coursework in physics, chemistry, and biology for every student. The study used a retrospective cohort observational design to address the primary research question: are there differences between historically underserved students completing a Physics First science sequence and their peers completing a traditional science sequence in 1) science college-readiness test scores, 2) rates of science college-and career-readiness, and 3) interest in STEM? Small positive effects were found for all three outcomes for historically underserved students in the Physics First sequence.

  8. Single amino acid radiocarbon dating of Upper Paleolithic modern humans

    PubMed Central

    Marom, Anat; McCullagh, James S. O.; Higham, Thomas F. G.; Sinitsyn, Andrey A.; Hedges, Robert E. M.

    2012-01-01

    Archaeological bones are usually dated by radiocarbon measurement of extracted collagen. However, low collagen content, contamination from the burial environment, or museum conservation work, such as addition of glues, preservatives, and fumigants to “protect” archaeological materials, have previously led to inaccurate dates. These inaccuracies in turn frustrate the development of archaeological chronologies and, in the Paleolithic, blur the dating of such key events as the dispersal of anatomically modern humans. Here we describe a method to date hydroxyproline found in collagen (∼10% of collagen carbon) as a bone-specific biomarker that removes impurities, thereby improving dating accuracy and confidence. This method is applied to two important sites in Russia and allows us to report the earliest direct ages for the presence of anatomically modern humans on the Russian Plain. These dates contribute considerably to our understanding of the emergence of the Mid-Upper Paleolithic and the complex suite of burial behaviors that begin to appear during this period. PMID:22517758

  9. Single amino acid radiocarbon dating of Upper Paleolithic modern humans.

    PubMed

    Marom, Anat; McCullagh, James S O; Higham, Thomas F G; Sinitsyn, Andrey A; Hedges, Robert E M

    2012-05-01

    Archaeological bones are usually dated by radiocarbon measurement of extracted collagen. However, low collagen content, contamination from the burial environment, or museum conservation work, such as addition of glues, preservatives, and fumigants to "protect" archaeological materials, have previously led to inaccurate dates. These inaccuracies in turn frustrate the development of archaeological chronologies and, in the Paleolithic, blur the dating of such key events as the dispersal of anatomically modern humans. Here we describe a method to date hydroxyproline found in collagen (~10% of collagen carbon) as a bone-specific biomarker that removes impurities, thereby improving dating accuracy and confidence. This method is applied to two important sites in Russia and allows us to report the earliest direct ages for the presence of anatomically modern humans on the Russian Plain. These dates contribute considerably to our understanding of the emergence of the Mid-Upper Paleolithic and the complex suite of burial behaviors that begin to appear during this period.

  10. Fabry-Perot Interferometer for Column CO2

    NASA Technical Reports Server (NTRS)

    Heaps, William S.; Kawa, Randolph; Bhartia, P. K. (Technical Monitor)

    2002-01-01

    Global atmospheric CO2 measurements are essential to resolving significant discrepancies in our understanding of the global carbon budget and, hence, humankind's role in global climate change. The science measurement requirements for CO2 are extremely demanding (precision approx. 0.3%). No atmospheric chemical species has ever been measured from space with this precision. We are developing a novel application of a Fabry-Perot interferometer to detect spectral absorption of reflected sunlight by CO2 and O2 in the atmosphere. Preliminary design studies indicate that the method will be able to achieve the sensitivity and signal-to-noise detection required to measure column CO2 at the target specification. The objective of this program is to construct a prototype instrument for deployment on an aircraft to test the instrument performance and our ability to retrieve the data in the real atmosphere. To date we have assembled a laboratory bench system to begin testing the optical and electronic components. We are also measuring signal and noise levels in actual sunlight to evaluate component performance.

  11. 78 FR 73415 - Information To Be Distributed to the Federal Home Loan Banks and the Office of Finance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-06

    ...Section 20A of the Federal Home Loan Bank Act (Bank Act), requires the Director of the Federal Housing Finance Agency (FHFA) to make available to the Federal Home Loan Banks (Banks) such reports, records, or other information as may be available, relating to the condition of any Bank in order to enable each Bank to evaluate the financial condition of one or more of the other Banks individually and the Bank System as a whole. FHFA has adopted, and published in this issue of the Federal Register, a regulation to implement the statutory information sharing provisions, which will be located at 12 CFR part 1260. As required by Sec. 1260.2(b) of that regulation, FHFA is providing this notification to the Banks and the Bank System's Office of Finance of the categories of information that it will distribute under part 1260 beginning on the effective date noted below.

  12. Training Students in Community Health: A Novel Required Fourth-Year Clerkship at the University of Rochester

    PubMed Central

    McIntosh, Scott; Block, Robert C.; Kapsak, Gabrielle; Pearson, Thomas A.

    2012-01-01

    In 2004, community health became the 4th mission of the University of Rochester Medical Center, along with education, clinical care, and research. In that same year, a novel clerkship was added to the 4th-year curriculum that focuses on the “practice” of community health and preventive medicine. The goal is to offer intensive experiential training to develop skills in community health improvement by partnering with community agencies involved in health promotion and disease prevention. The learning objectives addressed include: community health assessment, risk behavior change, assurance of personal health services, advocacy and policy change, environmental interventions, community organization and partnership-building, and program evaluation. The clerkship involves 3 full days of didactic instruction, followed by 4 weeks of program development and implementation. Each student chooses a project that focuses on a specific target population, then designs it and incorporates public health knowledge, skills, and attitudes learned during the didactic component. Course directors then mentor students during project implementation. Students can begin “longitudinal” experiences in their first or second years to fold into the required clerkship. Innovations include a novel “Advocacy and Policy Change” module and a highly rated “Cultural Determinants of Health” lecture, and a resource-based course website. The clerkship was initially offered as an elective, and has since become a required course. In the clerkship to date, three hundred and forty students have launched hundreds of community-level interventions within various settings locally, nationally, and internationally. Evaluation efforts to date indicate the clerkship has been received favorably by both faculty and students. PMID:18367896

  13. New U-series dates at the Caune de l'Arago, France

    USGS Publications Warehouse

    Falgueres, Christophe; Yokoyama, Y.; Shen, G.; Bischoff, J.L.; Ku, T.-L.; de Lumley, Henry

    2004-01-01

    In the beginning of the 1980s, the Caune de l'Arago was the focus of an interdisciplinary effort to establish the chronology of the Homo heidelbergensis (Preneandertals) fossils using a variety of techniques on bones and on speleothems. The result was a very large spread of dates particularly on bone samples. Amid the large spread of results, some radiometric data on speleothems showed a convergence in agreement with inferences from faunal studies. We present new U-series results on the stalagmitic formation located at the bottom of Unit IV (at the base of the Upper Stratigraphic Complex). Samples and splits were collaboratively analyzed in the four different laboratories with excellent interlaboratory agreement. Results show the complex sequence of this stalagmitic formation. The most ancient part is systematically at internal isotopic equilibrium (>350 ka) suggesting growth during or before isotopic stage 9, representing a minimum age for the human remains found in Unit III of the Middle Stratigraphical Complex which is stratigraphically under the basis of the studied stalagmitic formation. Overlaying parts of the speleothem date to the beginning of marine isotope stages 7 and 5. ?? 2003 Elsevier Science Ltd. All rights reserved.

  14. New U-series dates at the Caune de l'Arago, France

    USGS Publications Warehouse

    Falgueres, Christophe; Yokoyama, Y.; Shen, G.; Bischoff, J.L.; Ku, T.-L.; de Lumley, Henry

    2004-01-01

    In the beginning of the 1980s, the Caune de l'Arago was the focus of an interdisciplinary effort to establish the chronology of the Homo heidelbergensis (Preneandertals) fossils using a variety of techniques on bones and on speleothems. The result was a very large spread of dates particularly on bone samples. Amid the large spread of results, some radiometric data on speleothems showed a convergence in agreement with inferences from faunal studies. We present new U-series results on the stalagmitic formation located at the bottom of Unit IV (at the base of the Upper Stratigraphic Complex). Samples and splits were collaboratively analyzed in the four different laboratories with excellent interlaboratory agreement. Results show the complex sequence of this stalagmitic formation. The most ancient part is systematically at internal isotopic equilibrium (>350 ka) suggesting growth during or before isotopic stage 9, representing a minimum age for the human remains found in Unit III of the Middle Stratigraphical Complex which is stratigraphically under the basis of the studied stalagmitic formation. Overlaying parts of the speleothem date to the beginning of marine isotope stages 7 and 5. ?? 2003 Elsevier Ltd. All rights reserved.

  15. 26 CFR 1.1374-10 - Effective date and additional rules.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... LIFO layer existing prior to the beginning of the first taxable year as an S corporation is invaded..., notwithstanding that the taxable income limitation of section 1374(d)(2)(A)(ii) might otherwise limit the taxation...

  16. 75 FR 64985 - Upper Rio Grande Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... money. DATES: The meeting will be held on November 8, 2010, and will begin at 10 a.m. ADDRESSES: The... and recommend project proposals to be funded with Title II money; (3) Create a timeline to receive and...

  17. 76 FR 15290 - Upper Rio Grande Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-21

    ... Title II money. DATES: The meeting will be held on April 11, 2011 and will begin at 10 a.m. ADDRESSES... approved projects; (3) Review, evaluate and recommend project proposals to be funded with Title II money...

  18. 75 FR 55539 - Upper Rio Grande Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... money. DATES: The meeting will be held on September 28, 2010, and will begin at 10:30 a.m. ADDRESSES... be funded with Title II money; (4) Create a timeline to receive and review new project proposals and...

  19. 38 CFR 21.42 - Deferral or extension of the basic period of eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will begin or resume on the date a Counseling Psychologist (CP) or Vocational Rehabilitation Counselor (VRC) notifies the veteran in writing that the CP or VRC has determined, based on the evidence of...

  20. 38 CFR 21.42 - Deferral or extension of the basic period of eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... will begin or resume on the date a Counseling Psychologist (CP) or Vocational Rehabilitation Counselor (VRC) notifies the veteran in writing that the CP or VRC has determined, based on the evidence of...

  1. 38 CFR 21.42 - Deferral or extension of the basic period of eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... will begin or resume on the date a Counseling Psychologist (CP) or Vocational Rehabilitation Counselor (VRC) notifies the veteran in writing that the CP or VRC has determined, based on the evidence of...

  2. 38 CFR 21.42 - Deferral or extension of the basic period of eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will begin or resume on the date a Counseling Psychologist (CP) or Vocational Rehabilitation Counselor (VRC) notifies the veteran in writing that the CP or VRC has determined, based on the evidence of...

  3. 38 CFR 21.42 - Deferral or extension of the basic period of eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... will begin or resume on the date a Counseling Psychologist (CP) or Vocational Rehabilitation Counselor (VRC) notifies the veteran in writing that the CP or VRC has determined, based on the evidence of...

  4. 22 CFR 19.9-2 - Commencement and termination.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... becomes entitled to a Foreign Service annuity or on the first day of the month in which the divorce... service; (2) The date the disability annuity begins; or (3) The first of the month in which the divorce...

  5. 22 CFR 19.9-2 - Commencement and termination.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... becomes entitled to a Foreign Service annuity or on the first day of the month in which the divorce... service; (2) The date the disability annuity begins; or (3) The first of the month in which the divorce...

  6. 22 CFR 19.9-2 - Commencement and termination.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... becomes entitled to a Foreign Service annuity or on the first day of the month in which the divorce... service; (2) The date the disability annuity begins; or (3) The first of the month in which the divorce...

  7. 22 CFR 19.9-2 - Commencement and termination.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... becomes entitled to a Foreign Service annuity or on the first day of the month in which the divorce... service; (2) The date the disability annuity begins; or (3) The first of the month in which the divorce...

  8. 22 CFR 19.9-2 - Commencement and termination.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... becomes entitled to a Foreign Service annuity or on the first day of the month in which the divorce... service; (2) The date the disability annuity begins; or (3) The first of the month in which the divorce...

  9. SPRUCE Ground Observations of Phenology in Experimental Plots, 2016-2017

    DOE Data Explorer

    Richardson, Andrew D.; Latimer, John M.; Nettles, W. Robert; Heiderman, Ryan R.; Warren, Jeffrey M.; Hanson, Paul J.

    2018-01-01

    This data set consists of phenological transition dates, as derived from direct observations of vegetative and reproductive phenology recorded by a human observer, from the SPRUCE experiment during the 2+ years (August 2015 through December 2017) of whole-ecosystem warming. For 2016, only springtime (April - June) phenological events are included. For 2017 (April - December), spring and autumn events are included.

    Beginning in April 2016, human observers have been directly tracking the phenology of both woody and herbaceous species on a weekly schedule within the SPRUCE experimental chambers. The observed date reported here is the first survey date on which an event/phenophase was definitively observed.

  10. Rewriting the Central European Early Bronze Age Chronology: Evidence from Large-Scale Radiocarbon Dating

    PubMed Central

    Knipper, Corina; Friedrich, Ronny; Kromer, Bernd; Lindauer, Susanne; Radosavljević, Jelena; Wittenborn, Fabian; Krause, Johannes

    2015-01-01

    The transition from the Neolithic to the Early Bronze Age in Central Europe has often been considered as a supra-regional uniform process, which led to the growing mastery of the new bronze technology. Since the 1920s, archaeologists have divided the Early Bronze Age into two chronological phases (Bronze A1 and A2), which were also seen as stages of technical progress. On the basis of the early radiocarbon dates from the cemetery of Singen, southern Germany, the beginning of the Early Bronze Age in Central Europe was originally dated around 2300/2200 BC and the transition to more complex casting techniques (i.e., Bronze A2) around 2000 BC. On the basis of 140 newly radiocarbon dated human remains from Final Neolithic, Early and Middle Bronze Age cemeteries south of Augsburg (Bavaria) and a re-dating of ten graves from the cemetery of Singen, we propose a significantly different dating range, which forces us to re-think the traditional relative and absolute chronologies as well as the narrative of technical development. We are now able to date the beginning of the Early Bronze Age to around 2150 BC and its end to around 1700 BC. Moreover, there is no transition between Bronze (Bz) A1 and Bronze (Bz) A2, but a complete overlap between the type objects of the two phases from 1900–1700 BC. We thus present a revised chronology of the assumed diagnostic type objects of the Early Bronze Age and recommend a radiocarbon-based view on the development of the material culture. Finally, we propose that the traditional phases Bz A1 and Bz A2 do not represent a chronological sequence, but regionally different social phenomena connected to the willingness of local actors to appropriate the new bronze technology. PMID:26488413

  11. When Will It Be …?: U.S. Naval Observatory Religious Calendar Computers Expanded

    NASA Astrophysics Data System (ADS)

    Bartlett, Jennifer L.; Chizek Frouard, Malynda; Ziegler, Cross; Lesniak, Michael V.

    2017-01-01

    Reflecting increasing sensitivity to differing religious practices, the U.S. Naval Observatory (USNO) has expanded its on-line calendar resources to compute additional religious dates for specific years via an Application Programming Interface (API). This flexible method now identifies Christian, Islamic, and Jewish events in JavaScript Object Notation (JSON) that anyone can use.Selected Christian Observances (http://aa.usno.navy.mil/data/docs/easter.php) returns dates of eight events for years after 1582 C.E. (A.D. 1582): Ash Wednesday, Palm Sunday, Good Friday, Easter, Ascension, Whit Sunday, Trinity Sunday, and the first Sunday of Advent. The determination of Easter, a moveable feast, uses the method of western Christian churches.Selected Islamic Observances (http://aa.usno.navy.mil/data/docs/islamic.php) returns approximate Gregorian dates of three events for years after 1582 C.E. (A.H. 990) and Julian dates for 622-1582 C.E. (A.H. 1-990) along with the corresponding Islamic year (anno Hegirae). Ramadân, Shawwál, and the Islamic year begin at sunset on the preceding Gregorian or Julian date. For planning purposes, the determination of these dates uses a tabular calendar; in practice, observation of the appropriate waxing crescent Moon determines the actual date, which may vary.Selected Jewish Observances (http://aa.usno.navy.mil/data/docs/passover.php) returns Gregorian dates of six events for years after 1582 C.E. (A.M. 5342) and Julian dates for the years 360-1582 C.E. (A.M. 4120-5342) along with the corresponding Jewish year (anno Mundi). Passover, Shavuot, Rosh Hashanah, Yom Kippur, and Hanukkah begin at sunset on the preceding Gregorian or Julian date.On-line documentation for using the API-enabled calendar computers, including sample calls, is available (http://aa.usno.navy.mil/data/docs/api.php). The webpage also describes how to use the API with the Complete Sun and Moon Data for One Day, Phases of the Moon, Solar Eclipse Computer, Day and Night Across the Earth, Apparent Disk of a Solar System Object, Julian Date Conversion, and Sidereal Time services.Introduction to Calendars (http://aa.usno.navy.mil/faq/docs/calendars.php) provides an overview of the topic and links to additional resources.

  12. Snežna jama (Slovenia): Interdisciplinary dating of cave sediments and implication for landscape evolution

    PubMed Central

    Häuselmann, Philipp; Mihevc, Andrej; Pruner, Petr; Horáček, Ivan; Čermák, Stanislav; Hercman, Helena; Sahy, Diana; Fiebig, Markus; Hajna, Nadja Zupan; Bosák, Pavel

    2015-01-01

    Caves are important markers of surface evolution, since they are, as a general rule, linked with ancient valley bottoms by their springs. However, caves can only be dated indirectly by means of the sediments they contain. If the sediment is older than common dating methods, one has to use multiple dating approaches in order to get meaningful results. U/Th dating, palaeomagnetic analysis of flowstone and sediment profiles, cosmogenic dating of quartz pebbles, and mammalian dating allowed a robust estimate of speleogenesis, sediment deposition, climatic change at the surface, and uplift history on the Periadriatic fault line during the Plio-Pleistocene. Our dates indicate that Snežna jama was formed in the (Upper) Miocene, received its sedimentary deposits during the Pliocene in a rather low-lying, hilly landscape, and became inactive due to uplift along the Periadriatic and Sava faults and climatic changes at the beginning of the Quaternary. Although it is only a single cave, the information contained within it makes it an important site of the Southern Alps. PMID:26516294

  13. Snežna jama (Slovenia): Interdisciplinary dating of cave sediments and implication for landscape evolution.

    PubMed

    Häuselmann, Philipp; Mihevc, Andrej; Pruner, Petr; Horáček, Ivan; Čermák, Stanislav; Hercman, Helena; Sahy, Diana; Fiebig, Markus; Hajna, Nadja Zupan; Bosák, Pavel

    2015-10-15

    Caves are important markers of surface evolution, since they are, as a general rule, linked with ancient valley bottoms by their springs. However, caves can only be dated indirectly by means of the sediments they contain. If the sediment is older than common dating methods, one has to use multiple dating approaches in order to get meaningful results. U/Th dating, palaeomagnetic analysis of flowstone and sediment profiles, cosmogenic dating of quartz pebbles, and mammalian dating allowed a robust estimate of speleogenesis, sediment deposition, climatic change at the surface, and uplift history on the Periadriatic fault line during the Plio-Pleistocene. Our dates indicate that Snežna jama was formed in the (Upper) Miocene, received its sedimentary deposits during the Pliocene in a rather low-lying, hilly landscape, and became inactive due to uplift along the Periadriatic and Sava faults and climatic changes at the beginning of the Quaternary. Although it is only a single cave, the information contained within it makes it an important site of the Southern Alps.

  14. 15. Photographic copy of photograph, dated 30 August 1971 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of photograph, dated 30 August 1971 (original print in possession of CSSD-HO, Huntsville, AL). Photographer unknown. View (southwest to northeast) of missile site control building. Of particular interest is the uncompleted subterranean portion and the workers, who give an indication of the actual scale of the building. In the foreground can be seen the beginning of the heat sink - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND

  15. 76 FR 3062 - Extension of Comment Period on Change to the Reporting Date for Certain Data Elements Required...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ...-9252-4] Extension of Comment Period on Change to the Reporting Date for Certain Data Elements Required... Change to the Reporting Date for Certain Data Elements Required Under the Mandatory Reporting of... the Reporting Date for Certain Data Elements Required Under the Mandatory Reporting of Greenhouse...

  16. 77 FR 65905 - Notice of Public Meeting of the Carrizo Plain National Monument Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... below. DATES: The meeting will be held on Saturday, December 1, 2012, at the Carrisa Plains Elementary School, located approximately 2 miles northwest of Soda Lake Road on Highway 58. The meeting will begin...

  17. 75 FR 53334 - Notice of Public Meeting of the Carrizo Plain National Monument Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... below. DATES: The meeting will be held on Saturday, October 30, 2010 at the Carrisa Plain Elementary School, located approximately 2 miles northwest of Soda Lake Road on Highway 58. The meeting will begin...

  18. 77 FR 27480 - Notice of Public Meeting of the Carrizo Plain National Monument Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... below. DATES: The meeting will be held on Saturday, June 30, 2012, at the Carrisa Plains Elementary School, located approximately 2 miles northwest of Soda Lake Road on Highway 58. The meeting will begin...

  19. 5 CFR 630.1307 - Crediting annual leave accounts of eligible returnees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Gulf War, or time spent on active duty) other than each employee's status as an eligible returnee. (b..., but not later than the end of the second pay period beginning on or after the date the agency is...

  20. Teen dating violence: building a research program through collaborative insights.

    PubMed

    Mulford, Carrie F; Blachman-Demner, Dara R

    2013-06-01

    The National Institute of Justice (NIJ) has an emerging portfolio of research in the area of teen dating violence (also known as adolescent relationship abuse). This article begins with a discussion of the developments that prompted NIJ to focus on teen dating violence. Next, the article highlights specific accomplishments and contributions that NIJ has made to helping develop knowledge and scientific understanding of adolescent relationship abuse, particularly around the prevention of teen dating violence perpetration and victimization. This is followed by a presentation of some of the key findings from NIJ-funded research. We then move to a discussion of some of the complex issues around definition, measurement and research methods and how NIJ has been involved in addressing those issues. The article concludes with some thoughts about the intersection of teen dating violence research, policy, and practice and highlights several research gaps that are in need of additional attention.

  1. The role of plant phenology in stomatal ozone flux modeling.

    PubMed

    Anav, Alessandro; Liu, Qiang; De Marco, Alessandra; Proietti, Chiara; Savi, Flavia; Paoletti, Elena; Piao, Shilong

    2018-01-01

    Plant phenology plays a pivotal role in the climate system as it regulates the gas exchange between the biosphere and the atmosphere. The uptake of ozone by forest is estimated through several meteorological variables and a specific function describing the beginning and the termination of plant growing season; actually, in many risk assessment studies, this function is based on a simple latitude and topography model. In this study, using two satellite datasets, we apply and compare six methods to estimate the start and the end dates of the growing season across a large region covering all Europe for the year 2011. Results show a large variability between the green-up and dormancy dates estimated using the six different methods, with differences greater than one month. However, interestingly, all the methods display a common spatial pattern in the uptake of ozone by forests with a marked change in the magnitude, up to 1.9 TgO 3 /year, and corresponding to a difference of 25% in the amount of ozone that enters the leaves. Our results indicate that improved estimates of ozone fluxes require a better representation of plant phenology in the models used for O 3 risk assessment. © 2017 John Wiley & Sons Ltd.

  2. Negative Interpersonal Interactions and Dating Abuse Perpetration: The Mediating Role of Dispositional Forgivingness.

    PubMed

    Garthe, Rachel C; Griffin, Brandon J; Worthington, Everett L; Goncy, Elizabeth A; Sullivan, Terri N; Coleman, Jennifer A; Davis, Don E; Kwakye-Nuako, Charlotte O; Mokushane, Thapelo; Makola, Solomon; Anakwah, Nkansah

    2017-06-01

    Theory and research suggest that an individual's negative interactions with his or her parents or romantic partner are associated with the perpetration of dating abuse. Research is beginning to explore the role of forgivingness within abusive romantic relationships, and these preliminary findings suggest that dispositional forgivingness might mediate the relations between negative interpersonal interactions and dating abuse. The current study assessed negative interactions with one's parents and one's romantic partner, the frequency of dating abuse perpetration, and dispositional forgivingness of others and oneself among a sample of emerging adults in college ( n = 421). Dispositional forgivingness of others was negatively associated with the perpetration of emotional/verbal dating abuse and threatening behaviors, and it mediated relations between negative interpersonal interactions and dating abuse perpetration. Our findings suggest that the tendency to forgive others may explain why some individuals who experience negative interpersonal interactions with parents or romantic partners do not escalate to perpetration of abuse within their romantic relationships. Implications for future research and application are discussed.

  3. 12 CFR 252.153 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) ENHANCED PRUDENTIAL STANDARDS (REGULATION YY) Company-Run Stress Test Requirements for Banking... December 31, 2012, must comply with the requirements of this subpart beginning with the stress test cycle... effect on May 19, 2010) must comply with the requirements of this subpart beginning with the stress test...

  4. 40 CFR 761.61 - PCB remediation waste.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... care centers, endangered species habitats, estuaries, wetlands, national parks, national wildlife... ACT POLYCHLORINATED BIPHENYLS (PCBs) MANUFACTURING, PROCESSING, DISTRIBUTION IN COMMERCE, AND USE... least 30 days prior to the date that the cleanup of a site begins, the person in charge of the cleanup...

  5. 26 CFR 1.401(a)(26)-9 - Effective dates and transition rules.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., 1996, or 90 days after the opening of the first legislative session beginning on or after January 1... general. Pursuant to section 1112(e)(3) of the Tax Reform Act of 1986 (TRA '86), if certain conditions are...

  6. 26 CFR 1.401(a)(26)-9 - Effective dates and transition rules.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... later of January 1, 1996, or 90 days after the opening of the first legislative session beginning on or... general. Pursuant to section 1112(e)(3) of the Tax Reform Act of 1986 (TRA '86), if certain conditions are...

  7. 26 CFR 1.401(a)(26)-9 - Effective dates and transition rules.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... later of January 1, 1996, or 90 days after the opening of the first legislative session beginning on or... general. Pursuant to section 1112(e)(3) of the Tax Reform Act of 1986 (TRA '86), if certain conditions are...

  8. 26 CFR 1.401(a)(26)-9 - Effective dates and transition rules.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... later of January 1, 1996, or 90 days after the opening of the first legislative session beginning on or... general. Pursuant to section 1112(e)(3) of the Tax Reform Act of 1986 (TRA '86), if certain conditions are...

  9. 26 CFR 1.401(a)(26)-9 - Effective dates and transition rules.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... later of January 1, 1996, or 90 days after the opening of the first legislative session beginning on or... general. Pursuant to section 1112(e)(3) of the Tax Reform Act of 1986 (TRA '86), if certain conditions are...

  10. 76 FR 18153 - Southwest Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF AGRICULTURE Forest Service Southwest Idaho Resource Advisory Committee AGENCY... Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, April 21, 2011, beginning at 9 a.m. ADDRESSES: Idaho Counties Risk...

  11. Aviation Instructor's Handbook.

    ERIC Educational Resources Information Center

    Federal Aviation Administration (DOT), Washington, DC.

    This handbook is designed for ground instructors, flight instructors, and aviation maintenance instructors, providing beginning instructors the foundation to understand and apply fundamentals of instruction. The handbook also provides aviation instructors with up-to-date information on learning and teaching, and how to relate this information to…

  12. The post-LGM deglaciation in Central and Southeast Switzerland: New insights from surface exposure dating

    NASA Astrophysics Data System (ADS)

    Boxleitner, Max; Maisch, Max; Brandova, Dagmar; Egli, Markus; Ochs, Susan Ivy; Christl, Marcus

    2017-04-01

    The deglaciation of the Alps after the Last Glacial Maximum was not a linear process. Moraines as traces of glacier re-advances show that the climate within the general Late-Pleistocene-warming is characterized by repeated cold intervals. While moraine series resulting from these cold spells have been already described for many Alpine valleys at the beginning of the 20th century, absolute chronologies of the Lateglacial climate and glacier development are still fragmentary. The advent of surface exposure dating as a new absolute dating method some 30 years ago made it possible to directly target the deposition-age of moraines. But still many questions regarding the local-to-regional glacier development and its coupling to the overall climate change remain open. In the framework of my PhD-project we study key sites in Central (Uri) and Southeast (Engadine) Switzerland with the aim to develop an absolute post-LGM chronology. More than 50 rock-samples from boulders of different moraine complexes from both regions have been analyzed using 10Be-surface-expsure-dating. Our results show that especially the Younger Dryas plays not unexpected an important role as a very pronounced cold interval. With our results we will refine the understanding of the glacier development in the Swiss Alps during the Lateglacial and the Holocene and improve estimates of equilibrium lines of altitude (ELA) of glaciers from the LGM to the beginning of the Holocene.

  13. A chronology for late prehistoric Madagascar.

    PubMed

    Burney, David A; Burney, Lida Pigott; Godfrey, Laurie R; Jungers, William L; Goodman, Steven M; Wright, Henry T; Jull, A J Timothy

    2004-01-01

    A database has been assembled with 278 age determinations for Madagascar. Materials 14C dated include pretreated sediments and plant macrofossils from cores and excavations throughout the island, and bones, teeth, or eggshells of most of the extinct megafaunal taxa, including the giant lemurs, hippopotami, and ratites. Additional measurements come from uranium-series dates on speleothems and thermoluminescence dating of pottery. Changes documented include late Pleistocene climatic events and, in the late Holocene, the apparently human-caused transformation of the environment. Multiple lines of evidence point to the earliest human presence at ca. 2300 14C yr BP (350 cal yr BC). A decline in megafauna, inferred from a drastic decrease in spores of the coprophilous fungus Sporormiella spp. in sediments at 1720+/-40 14C yr BP (230-410 cal yr AD), is followed by large increases in charcoal particles in sediment cores, beginning in the SW part of the island, and spreading to other coasts and the interior over the next millennium. The record of human occupation is initially sparse, but shows large human populations throughout the island by the beginning of the Second Millennium AD. Dating of the "subfossil" megafauna, including pygmy hippos, elephant birds, giant tortoises, and large lemurs, demonstrates that most if not all the extinct taxa were still present on the island when humans arrived. Many taxa overlapped chronologically with humans for a millennium or more. The extinct lemurs Hadropithecus stenognathus, Pachylemur insignis, Mesopropithecus pithecoides, and Daubentonia robusta, and the elephant birds Aepyornis spp. and Mullerornis spp., were still present near the end of the First Millennium AD. Palaeopropithecus ingens, Megaladapis edwardsi, and Archaeolemur sp. (cf. edwardsi) may have survived until the middle of the Second Millennium A.D. One specimen of Hippopotamus of unknown provenance dates to the period of European colonization.

  14. 76 FR 71078 - Sunshine Act Meetings; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... LEGAL SERVICES CORPORATION Sunshine Act Meetings; Notice DATE AND TIME: The Legal Services Corporation Board of Directors will meet telephonically on November 18, 2011. The meeting will begin at 4 p.m... McCalpin Conference Center, Legal Services Corporation Headquarters Building, 3333 K Street NW., Washington...

  15. 75 FR 76494 - Sunshine Act Meeting; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting; Notice TIME AND DATE: The Legal Services Corporation Board of Directors' Search Committee for LSC President (``Search Committee'' or ``Committee'') will meet on December 13, 2010. The meeting will begin at 10 a.m. (Eastern Time) and continue until...

  16. 76 FR 28097 - Sunshine Act Meetings; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... LEGAL SERVICES CORPORATION Sunshine Act Meetings; Notice DATE AND TIME: The Legal Services Corporation Board of Directors will meet telephonically on May 17, 2011. The meeting will begin at 11 a.m... McCalpin Conference Center, Legal Services Corporation Headquarters Building, 3333 K Street, NW...

  17. 75 FR 72842 - Sunshine Act Meeting; Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting; Notice Time and Date: The Legal Services Corporation Board of Directors' Search Committee for LSC President (``Search Committee'' or ``Committee'') will meet on November 29, 2010. The meeting will begin at 12 p.m. (Eastern Time) and continue until...

  18. Computer Disaster Recovery Planning.

    ERIC Educational Resources Information Center

    Clark, Orvin R.

    Arguing that complete, reliable, up-to-date system documentation is critical for every data processing environment, this paper on computer disaster recovery planning begins by discussing the importance of such documentation both for recovering from a systems crash, and for system maintenance and enhancement. The various components of system…

  19. Beginning Counselor Educators' Experiences Developing a Research Agenda

    ERIC Educational Resources Information Center

    Wilde, Brandon J.

    2010-01-01

    To date, counselor education literature is narrow in the accounts of counselor educators' experiences as active scholars (Hill, 2004). Consequently, there is little research accounting for the experience of developing a research agenda for counselor educators during their initial faculty appointment. Hermeneutic, phenomenological methodology was…

  20. 7 CFR 922.111 - Waiver of inspection and certification.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... address of applicant, location of packing facility, distance of packing facility from the nearest inspection office, period (by approximate beginning and ending dates) during which applicant expects to ship apricots, estimated quantity of apricots applicant expects to ship to fresh market during such period...

  1. 7 CFR 922.111 - Waiver of inspection and certification.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... address of applicant, location of packing facility, distance of packing facility from the nearest inspection office, period (by approximate beginning and ending dates) during which applicant expects to ship apricots, estimated quantity of apricots applicant expects to ship to fresh market during such period...

  2. 7 CFR 922.111 - Waiver of inspection and certification.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... address of applicant, location of packing facility, distance of packing facility from the nearest inspection office, period (by approximate beginning and ending dates) during which applicant expects to ship apricots, estimated quantity of apricots applicant expects to ship to fresh market during such period...

  3. 7 CFR 922.111 - Waiver of inspection and certification.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... address of applicant, location of packing facility, distance of packing facility from the nearest inspection office, period (by approximate beginning and ending dates) during which applicant expects to ship apricots, estimated quantity of apricots applicant expects to ship to fresh market during such period...

  4. 20 CFR 218.30 - Separation, displacement or dismissal allowance.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 1 2013-04-01 2012-04-01 true Separation, displacement or dismissal..., Spouse, or Divorced Spouse Annuity Beginning Date § 218.30 Separation, displacement or dismissal allowance. (a) General. When an employee receives a separation, displacement or dismissal allowance from a...

  5. 20 CFR 218.30 - Separation, displacement or dismissal allowance.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 1 2014-04-01 2012-04-01 true Separation, displacement or dismissal..., Spouse, or Divorced Spouse Annuity Beginning Date § 218.30 Separation, displacement or dismissal allowance. (a) General. When an employee receives a separation, displacement or dismissal allowance from a...

  6. 20 CFR 218.30 - Separation, displacement or dismissal allowance.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 1 2012-04-01 2012-04-01 false Separation, displacement or dismissal..., Spouse, or Divorced Spouse Annuity Beginning Date § 218.30 Separation, displacement or dismissal allowance. (a) General. When an employee receives a separation, displacement or dismissal allowance from a...

  7. 20 CFR 218.30 - Separation, displacement or dismissal allowance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Separation, displacement or dismissal..., Spouse, or Divorced Spouse Annuity Beginning Date § 218.30 Separation, displacement or dismissal allowance. (a) General. When an employee receives a separation, displacement or dismissal allowance from a...

  8. 20 CFR 218.30 - Separation, displacement or dismissal allowance.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 1 2011-04-01 2011-04-01 false Separation, displacement or dismissal..., Spouse, or Divorced Spouse Annuity Beginning Date § 218.30 Separation, displacement or dismissal allowance. (a) General. When an employee receives a separation, displacement or dismissal allowance from a...

  9. 7 CFR 550.21 - Funding availability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Funding availability. 550.21 Section 550.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT... Agreements Financial Management § 550.21 Funding availability. The funding period will begin on the date of...

  10. 7 CFR 550.21 - Funding availability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Funding availability. 550.21 Section 550.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT... Agreements Financial Management § 550.21 Funding availability. The funding period will begin on the date of...

  11. 7 CFR 550.21 - Funding availability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Funding availability. 550.21 Section 550.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT... Agreements Financial Management § 550.21 Funding availability. The funding period will begin on the date of...

  12. 7 CFR 550.21 - Funding availability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Funding availability. 550.21 Section 550.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT... Agreements Financial Management § 550.21 Funding availability. The funding period will begin on the date of...

  13. 7 CFR 550.21 - Funding availability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Funding availability. 550.21 Section 550.21 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT... Agreements Financial Management § 550.21 Funding availability. The funding period will begin on the date of...

  14. 5 CFR 1650.16 - Required withdrawal date.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FUNDS FROM THE THRIFT SAVINGS PLAN Post-Employment Withdrawals § 1650.16 Required withdrawal date. (a) A... date described in paragraph (a) of this section, but is not required to do so. (c) In the event that a...

  15. ENRE 655 Class Project. Development of the Initial Main Parachute Failure Probability for the Constellation Program (CxP) Orion Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS)

    NASA Technical Reports Server (NTRS)

    Fuqua, Bryan C.

    2010-01-01

    Loss of Crew (LOC) and Loss of Mission (LOM) are two key requirements the Constellation Program (CxP) measure against. To date, one of the top risk drivers for both LOC and LOM has been Orion's Crew Exploration Vehicle (CEV) Parachute Assembly System (CPAS). Even though the Orion CPAS is one of the top risk drivers of CxP, it has been very difficult to obtain any relevant data to accurately quantify the risk. At first glance, it would seem that a parachute system would be very reliable given the track record of Apollo and Soyuz. Given the success of those two programs, the amount of data is considered to be statistically insignificant. However, due to CxP having LOC/LOM as key design requirements, it was necessary for Orion to generate a valid prior to begin the Risk Informed Design process. To do so, the Safety & Mission Assurance (S&MA) Space Shuttle & Exploration Analysis Section generated an initial failure probability for Orion to use in preparation for the Orion Systems Requirements Review (SRR).

  16. The role of peer group aggression in predicting adolescent dating violence and relationship quality.

    PubMed

    Ellis, Wendy E; Chung-Hall, Janet; Dumas, Tara M

    2013-04-01

    Past research has shown that adolescent peer groups make a significant contribution to shaping behavior but less is known about the role of peer groups in adolescent dating relationships. This longitudinal study examined the contribution of aggressive peer group norms on relationship quality and dating violence among dating adolescents. At the beginning of the school year (T1) and 6 months later (T2), participants (n = 1,070; M(age) = 15.45; 49 % Female) provided self-reports of attitudes towards aggression, and physically- and relationally-aggressive behaviors. Peer groups were identified using a peer-nomination technique and aggressive behaviors and attitudes were averaged across peer groups. Participants with dating experience (n = 598) reported on the frequency of their experience with dating violence (both as a victim and perpetrator). Multilevel analyses indicated that peer group relational aggression at T1 positively predicted dating abuse victimization and perpetration, and negatively predicted relationship quality at T2, beyond individual predictions. An unexpected finding was that membership in physically aggressive peer groups at T1 was associated positively with relationship quality at T2. Results point to the importance of the peer group in shaping adolescent dating experiences.

  17. 21 CFR 1302.05 - Effective dates of labeling requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Effective dates of labeling requirements. 1302.05 Section 1302.05 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE LABELING AND PACKAGING REQUIREMENTS FOR CONTROLLED SUBSTANCES § 1302.05 Effective dates of labeling requirements. All...

  18. Developing a global crop model for maize, wheat, and soybean production

    NASA Astrophysics Data System (ADS)

    Deryng, D.; Ramankutty, N.; Sacks, W. J.

    2008-12-01

    Recently, the world food supply has faced a crisis due to increasing food prices driven by rising food demand, increasing fuel prices, poor harvests due to climate factors, and the use of crops such as maize and soybean to produce biofuel. In order to assess the future of global food availability, there is a need for understanding the factors underlying food production. Farmer management practices along with climatic conditions are the main elements directly influencing crop yield. As a consequence, estimations of future world food production require the use of a global crop model that simulates reasonably the effect of both climate and management practices on yield. Only a few global crop models have been developed to date, and currently none of them represent management factors adequately, principally due to the lack of spatially explicit datasets at the global scale. In this study, we present a global crop model designed for maize, wheat, and soybean production that incorporates planting and harvest decisions, along with irrigation options based on newly available data. The crop model is built on a simple water-balance algorithm based on the Penman- Monteith equation combined with a light use efficiency approach that calculates biomass production under non-nutrient-limiting conditions. We used a world crop calendar dataset to develop statistical relationships between climate variables and planting dates for different regions of the world. Development stages are defined based on total growing degree days required to reach the beginning of each phase. Irrigation options are considered in regions where water stress occurs and irrigation infrastructures exist. We use a global dataset on irrigated areas for each crop type. The quantity of water applied is then calculated in order to avoid water stress but with an upper threshold derived from total irrigation withdrawal quantity estimated by the global water use model WaterGAP 2. Our analysis will present the model sensitivity to different scenarios of management practices, e.g. planting date and water supply, under non-nutrient limited conditions. With this study, we hope to clarify the importance of planting date and irrigation versus climate for crop yield.

  19. 75 FR 49502 - Medical Device User Fee Act; Public Meeting; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... Federal Food, Drug, and Cosmetic Act (FD&C Act) requires that before FDA begins negotiations with the...)) requires that, before FDA begins negotiations with the regulated industry on user fee reauthorization, we...

  20. When Will It Be …?: U.S. Naval Observatory Calendar Computers

    NASA Astrophysics Data System (ADS)

    Bartlett, Jennifer L.; Chizek Frouard, Malynda; Lesniak, Michael V.

    2016-06-01

    Sensitivity to religious calendars is increasingly expected when planning activities. Consequently, the U.S. Naval Observatory (USNO) has redesigned its on-line calendar resources to allow the computation of select religious dates for specific years via an application programming interface (API). This flexible interface returns dates in JavaScript Object Notation (JSON) that can be incorporated into third-party websites or applications. Currently, the services compute Christian, Islamic, and Jewish events.The “Dates of Ash Wednesday and Easter” service (http://aa.usno.navy.mil/data/docs/easter.php) returns the dates of these two events for years after 1582 C.E. (1582 A.D.) The method of the western Christian churches is used to determined when Easter, a moveable feast, occurs.The “Dates of Islamic New Year and Ramadan” service (http://aa.usno.navy.mil/data/docs/islamic.php) returns the approximate Gregorian dates of these two events for years after 1582 C.E. (990 A.H.) and Julian dates are computed for the years 622-1582 C.E. (1-990 A.H.). The appropriate year in the Islamic calendar (anno Hegira) is also provided. Each event begins at 6 P.M. or sunset on the preceding day. These events are computed using a tabular calendar for planning purposes; in practice, the actual event is determined by observation of the appropriate new Moon.The “First Day of Passover” service (http://aa.usno.navy.mil/data/docs/passover.php) returns the Gregorian date corresponding to Nisan 15 for years after 1582 C.E. (5342 A.M.) and Julian dates are computed for the years 360-1582 C.E. (4120-5342 A.M.). The appropriate year in the Jewish calendar (anno Mundi) is also provided. Passover begins at 6 P.M. or sunset on the preceding day.On-line documentation for using the API-enabled calendar computers, including sample calls, is available (http://aa.usno.navy.mil/data/docs/api.php). The same web page also describes how to reach the Complete Sun and Moon Data for One Day, Phases of the Moon, Solar Eclipse Computer, Day and Night Across the Earth, and Apparent Disk of a Solar System Object services using API calls.An “Introduction to Calendars” (http://aa.usno.navy.mil/faq/docs/calendars.php) provides an overview of the topic and links to additional resources.

  1. Evaluating a Collaborative Approach to Improve Prior Authorization Efficiency in the Treatment of Hepatitis C Virus.

    PubMed

    Dunn, Emily E; Vranek, Kathryn; Hynicka, Lauren M; Gripshover, Janet; Potosky, Darryn; Mattingly, T Joseph

    A team-based approach to obtaining prior authorization approval was implemented utilizing a specialty pharmacy, a clinic-based pharmacy technician specialist, and a registered nurse to work with providers to obtain approval for medications for hepatitis C virus (HCV) infection. The objective of this study was to evaluate the time to approval for prescribed treatment of HCV infection. A retrospective observational study was conducted including patients treated for HCV infection by clinic providers who received at least 1 oral direct-acting antiviral HCV medication. Patients were divided into 2 groups, based on whether they were treated before or after the implementation of the team-based approach. Student t tests were used to compare average wait times before and after the intervention. The sample included 180 patients, 68 treated before the intervention and 112 patients who initiated therapy after. All patients sampled required prior authorization approval by a third-party payer to begin therapy. There was a statistically significant reduction (P = .02) in average wait time in the postintervention group (15.6 ± 12.1 days) once adjusted using dates of approval. Pharmacy collaboration may provide increases in efficiency in provider prior authorization practices and reduced wait time for patients to begin treatment.

  2. Evaluating a Collaborative Approach to Improve Prior Authorization Efficiency in the Treatment of Hepatitis C Virus

    PubMed Central

    Dunn, Emily E.; Vranek, Kathryn; Hynicka, Lauren M.; Gripshover, Janet; Potosky, Darryn

    2017-01-01

    Objective: A team-based approach to obtaining prior authorization approval was implemented utilizing a specialty pharmacy, a clinic-based pharmacy technician specialist, and a registered nurse to work with providers to obtain approval for medications for hepatitis C virus (HCV) infection. The objective of this study was to evaluate the time to approval for prescribed treatment of HCV infection. Methods: A retrospective observational study was conducted including patients treated for HCV infection by clinic providers who received at least 1 oral direct-acting antiviral HCV medication. Patients were divided into 2 groups, based on whether they were treated before or after the implementation of the team-based approach. Student t tests were used to compare average wait times before and after the intervention. Results: The sample included 180 patients, 68 treated before the intervention and 112 patients who initiated therapy after. All patients sampled required prior authorization approval by a third-party payer to begin therapy. There was a statistically significant reduction (P = .02) in average wait time in the postintervention group (15.6 ± 12.1 days) once adjusted using dates of approval. Conclusions: Pharmacy collaboration may provide increases in efficiency in provider prior authorization practices and reduced wait time for patients to begin treatment. PMID:28665904

  3. 78 FR 69879 - Workforce Investment Act: Native American Employment and Training Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... DEPARTMENT OF LABOR Employment and Training Administration Workforce Investment Act: Native American Employment and Training Council AGENCY: Employment and Training Administration, U.S. Department of... Employment and Training Council (Council), as constituted under WIA. DATES: The meeting will begin at 9:00 a...

  4. Jubilate!

    ERIC Educational Resources Information Center

    Livingston, K. Sylvia

    1992-01-01

    Describes using celebrations of dates in the history of science and technology as an instructional strategy. For example, the author celebrated the day of the Wright Brothers' first flight and culminated it with an paper airplane flying contest. Festivities begin with concept mapping to allow students the opportunity to relate new ideas to prior…

  5. 76 FR 17459 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... LEGAL SERVICES CORPORATION Sunshine Act Meeting TIME AND DATE: The Board of Directors of the Legal Services Corporation will meet telephonically on March 31, 2011. The meeting will begin at 11 a.m., Eastern Time, and continue until conclusion of the Board's agenda. LOCATION: The Legal Services Corporation...

  6. 76 FR 61727 - Pennsylvania; Emergency and Related Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    .... FEMA-3340-EM; Docket ID FEMA-2011-0001] Pennsylvania; Emergency and Related Determinations AGENCY... declaration of an emergency for the Commonwealth of Pennsylvania (FEMA-3340-EM), dated September 8, 2011, and... Pennsylvania resulting from the Remnants of Tropical Storm Lee beginning on September 3, 2011, and continuing...

  7. 75 FR 41239 - Sunshine Act; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-15

    ... LEGAL SERVICES CORPORATION Sunshine Act; Notice of Meeting TIME AND DATE: The Legal Services Corporation Board of Directors' Search Committee for LSC President (``Search Committee'' or ``Committee'') will meet on July 20, 2010. The meeting will begin at 4 p.m. (Central Daylight Savings Time) and...

  8. Research on Honors Composition, 2004-2015

    ERIC Educational Resources Information Center

    Guzy, Annmarie

    2016-01-01

    This bibliography is intended to offer future honors composition researchers a comprehensive list of honors composition publications and disciplinary presentations to date. Guzy's intent was to provide a starting place for future researchers to begin their literature reviews and to decide which research agenda to pursue. Guzy focused on…

  9. 75 FR 16070 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, April 15, 2010, beginning at 10:30 a.m. ADDRESSES: Idaho...

  10. 76 FR 6117 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... Sawtooth National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, February 17, 2011, beginning at 9 a.m. ADDRESSES: Idaho...

  11. 75 FR 24879 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, May 20, 2010, beginning at 10:30 a.m. ADDRESSES: Idaho...

  12. 75 FR 68321 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Tuesday November 9, 2010, beginning at 10:30 a.m. ADDRESSES: Idaho...

  13. THE LANDSCAPE PERSPECTIVE IN MITIGATING THE IMPACTS OF WETLAND HABITAT LOSS

    EPA Science Inventory

    Ecological restoration is viewed as a way to mitigate the effects of land uses and, potentially, global change. Research to date has primarily focused on the scale of the individual, restoration project, while restoration at the landscape scale is just beginning to be considered...

  14. Capturing Positive Transgressive Variation From Wild And Exotic Germplasm Resources

    USDA-ARS?s Scientific Manuscript database

    Only a small fraction of the naturally occurring genetic diversity available in rice germplasm repositories around the world has been explored to date. This is beginning to change with the advent of affordable, high throughput genotyping approaches coupled with robust statistical analysis methods th...

  15. 7 CFR 3400.6 - Grant awards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project grants to those responsible, eligible applicants whose proposals are judged most meritorious in... date specified by the Administrator as the beginning of the project period shall be no later than September 30 of the Federal fiscal year in which the project is approved for support and funds are...

  16. A three-channel LED driver with single line transportation technique

    NASA Astrophysics Data System (ADS)

    Yu, Caideng; Du, Yiying; Jiang, Qiao; Zhou, Yun; Lv, Jian

    2012-10-01

    Designed a three-channel LED driver, realized the single-wire transmission of cascade signal between the drive IC of LED. Including the MCU digital interface, date register, clock synchronization, PWM grayscale adjustment circuit, as well as high voltage driver circuit for LED, etc… The driver control LED displaying 256 gray. Chip will generate synchronous sampling clock signals according to the received serial signals, when 24 bits dates have been received, the output pin begins to transport the dates followed-up which are automotive shaped to the input of the next chip. When the date receiving becomes low level that represent RESET, the red, green and blue channels will export different signals based on different input dates. Through the external MCU, it is realized the Separate luminance, and by connecting chips in series it achieved the control of outdoor big screen' colorful display. The automatic shaping forward technique makes the number of chips cascading immune to the limitations of signal transmission, but only limited by the refresh speed.

  17. 20 CFR 638.527 - Federal employees' compensation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...' compensation. (a) Students shall be considered federal employees for purposes of Federal employees' compensation (FEC). (Section 436(a)(2)) (b) Resident students shall be considered to be in the “performance of duty” as Federal employees from the date they leave their homes and begin authorized travel to their...

  18. 24 CFR 3500.17 - Escrow accounts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... deficiencies exist. Escrow account computation year is a 12-month period that a servicer establishes for the escrow account beginning with the borrower's initial payment date. The term includes each 12-month period... cushion is two months of the borrower's escrow payments to the servicer or a lesser amount specified by...

  19. 76 FR 24884 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... Asian oversample to the survey design. Beginning in 2012 NHANES will also conduct the NHANES Youth... Health and Nutrition Examination Survey (NHANES)-- New--National Center for Health Statistics (NCHS... Nutrition Examination Survey (NHANES) has, to date, been authorized as a generic clearance under OMB Number...

  20. 77 FR 31340 - Notice of Submission for OMB Review; Office of Communications and Outreach; Presidential Scholars...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... (ACT) assessments, or on artistic merits based on participation in a national talent search. DATES..., Information Collection Clearance Division, Privacy, Information and Records Management Services, Office of Management, publishes this notice containing proposed information collection requests at the beginning of the...

  1. 75 FR 69632 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... public meetings, December 6-14, 2010, in Anchorage, AK. DATES: The Council will begin its plenary session... at the Hilton Hotel, 500 W Third Avenue, Anchorage, AK. Council address: North Pacific Fishery Management Council, 605 W. 4th Avenue, Suite 306, Anchorage, AK 99501-2252. FOR FURTHER INFORMATION CONTACT...

  2. Ambitious but Affordable

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2006-01-01

    In the beginning, optimism reigns. As planning for a new education facility gets underway, those with a stake in the process envision how the building will enhance the institution and the surrounding area. Teachers and students imagine spacious, comfortable classrooms and labs with the most up-to-date equipment and furniture. Administrators and…

  3. 40 CFR 97.504 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... subpart: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine... paragraph (a)(1) of this section, is not a TR NOX Ozone Season unit begins to combust fossil fuel or to... date on which it both combusts fossil fuel and serves such generator. (b) Any unit in a State (and...

  4. 40 CFR 97.504 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... subpart: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine... paragraph (a)(1) of this section, is not a TR NOX Ozone Season unit begins to combust fossil fuel or to... date on which it both combusts fossil fuel and serves such generator. (b) Any unit in a State (and...

  5. 40 CFR 97.204 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  6. 40 CFR 97.204 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  7. 40 CFR 97.104 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  8. 40 CFR 97.104 - Applicability

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  9. 40 CFR 97.204 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  10. 40 CFR 97.104 - Applicability

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  11. 40 CFR 97.204 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  12. 40 CFR 97.204 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  13. 40 CFR 97.104 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  14. 40 CFR 97.504 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... subpart: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine... paragraph (a)(1) of this section, is not a TR NOX Ozone Season unit begins to combust fossil fuel or to... date on which it both combusts fossil fuel and serves such generator. (b) Any unit in a State (and...

  15. 40 CFR 97.104 - Applicability

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired combustion turbine serving... unit begins to combust fossil fuel or to serve a generator with nameplate capacity of more than 25 MWe... this section on the first date on which it both combusts fossil fuel and serves such generator. (b) The...

  16. Early Childhood Inclusion in Croatia

    ERIC Educational Resources Information Center

    Ljubešic, Marta; Šimleša, Sanja

    2016-01-01

    This article explains early childhood inclusion in Croatia from its beginnings up to challenges in current policy and practice. The first preschool education for children with disabilities dates back to the 1980s and was provided in special institutions. In the last 10 years, mainstream kindergartens have been enrolling children with disabilities…

  17. 7 CFR 1416.102 - Eligible livestock and producers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-adult dairy cattle, beef cattle, buffalo, beefalo, equine, poultry, elk, reindeer, sheep, goats, swine... period; (3) Been maintained for commercial use as part of a farming operation on the beginning date of... use as part of a farming operation. Such excluded uses include, but are not limited to wild free...

  18. 42 CFR 71.53 - Nonhuman primates.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Nonhuman primates. 71.53 Section 71.53 Public... FOREIGN QUARANTINE Importations § 71.53 Nonhuman primates. (a) Definitions. As used in this section the... nonhuman primates from a foreign country within a period of 31 days, beginning with the importation date...

  19. 42 CFR 71.53 - Nonhuman primates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Nonhuman primates. 71.53 Section 71.53 Public... FOREIGN QUARANTINE Importations § 71.53 Nonhuman primates. (a) Definitions. As used in this section the... nonhuman primates from a foreign country within a period of 31 days, beginning with the importation date...

  20. 76 FR 14949 - Defense Acquisition University Industry Day: “Better Buying Power” Initiatives

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ...: ``Better Buying Power'' Initiatives AGENCY: Defense Acquisition University, DoD. ACTION: Event notice...: Defense Acquisition University Industry Day: ``Better Buying Power'' Initiatives. DATES: Thursday, April... initiatives 9 a.m. Question and answer session 10:30 a.m. Begin individual, 20-minute sessions Public's...

  1. 77 FR 75614 - Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Pacific Fishery Management Council's (Pacific Council) Highly Migratory Species Management Team (HMSMT) will hold a work session, which is open to the public. DATES: The HMSMT work session will begin each... day the meeting will continue until business is completed. ADDRESSES: The work sessions will be held...

  2. Patriotic Observances. Grades K-6.

    ERIC Educational Resources Information Center

    Manitoba Dept. of Education, Winnipeg.

    Materials and suggestions to help teachers in grades K-6 highlight special dates that hold significance for Canadian children are provided. The purpose is to arouse an awareness in children of their Canadian identity. The "patriotic observances" should take place at the beginning of every school day. Materials concerning Canadian natural…

  3. Alternative Transportation in Parks and Public Lands (ATPPL) program : review summary and results of Transportation Assistance Group (TAG) activities conducted to date

    DOT National Transportation Integrated Search

    2009-09-01

    Beginning in late 2006, the Alternative Transportation in Parks and Public Lands (ATPPL) Program jointly administered by the Federal Transit Administration (FTA) and the Department of the Interior (DOI) conducted a number of site-specific Tra...

  4. 26 CFR 1.856-2 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... TAXES (CONTINUED) Real Estate Investment Trusts § 1.856-2 Limitations. (a) Effective date. The... taxable years of a real estate investment trust beginning after December 31, 1960. (b) Election. Under the... subchapter M for the taxable year, will not be considered a “real estate investment trust” for such year...

  5. 26 CFR 1.856-2 - Limitations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... TAXES (CONTINUED) Real Estate Investment Trusts § 1.856-2 Limitations. (a) Effective date. The... taxable years of a real estate investment trust beginning after December 31, 1960. (b) Election. Under the... subchapter M for the taxable year, will not be considered a “real estate investment trust” for such year...

  6. 26 CFR 1.856-2 - Limitations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... TAXES (CONTINUED) Real Estate Investment Trusts § 1.856-2 Limitations. (a) Effective date. The... taxable years of a real estate investment trust beginning after December 31, 1960. (b) Election. Under the... subchapter M for the taxable year, will not be considered a “real estate investment trust” for such year...

  7. 26 CFR 1.856-2 - Limitations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... TAXES (CONTINUED) Real Estate Investment Trusts § 1.856-2 Limitations. (a) Effective date. The... taxable years of a real estate investment trust beginning after December 31, 1960. (b) Election. Under the... subchapter M for the taxable year, will not be considered a “real estate investment trust” for such year...

  8. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... certifications of stations and inspectors; (vi) The date mandatory testing will begin for each model year to be... source emission model or an alternative approved by the Administrator showing that the program meets the... memoranda of understanding; and (8) Evidence of adequate funding and resources to implement all aspects of...

  9. 48 CFR 252.219-7011 - Notification to delay performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... begin performance under this purchase order until 2 working days have passed from the date of its... performance. 252.219-7011 Section 252.219-7011 Federal Acquisition Regulations System DEFENSE ACQUISITION... of Provisions And Clauses 252.219-7011 Notification to delay performance. As prescribed in 219.811-3...

  10. 45 CFR 506.10 - “Vietnam conflict” defined.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... § 506.10 “Vietnam conflict” defined. Vietnam conflict refers to the period beginning February 28, 1961... “Vietnam conflict” for purposes of payment of interest on missing military service members' deposits in the... ending date for the Vietnam conflict for purposes of determining eligibility for compensation under 50 U...

  11. 17 CFR 229.1121 - (Item 1121) Distribution and pool performance information.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and actual distribution dates for the distribution period. (2) Cash flows received and the sources... shortfalls or carryovers. (iv) The amount of excess cash flow or excess spread and the disposition of excess cash flow. (4) Beginning and ending principal balances of the asset-backed securities. (5) Interest...

  12. 17 CFR 229.1121 - (Item 1121) Distribution and pool performance information.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and actual distribution dates for the distribution period. (2) Cash flows received and the sources... shortfalls or carryovers. (iv) The amount of excess cash flow or excess spread and the disposition of excess cash flow. (4) Beginning and ending principal balances of the asset-backed securities. (5) Interest...

  13. 17 CFR 229.1121 - (Item 1121) Distribution and pool performance information.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and actual distribution dates for the distribution period. (2) Cash flows received and the sources... shortfalls or carryovers. (iv) The amount of excess cash flow or excess spread and the disposition of excess cash flow. (4) Beginning and ending principal balances of the asset-backed securities. (5) Interest...

  14. 17 CFR 229.1121 - (Item 1121) Distribution and pool performance information.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and actual distribution dates for the distribution period. (2) Cash flows received and the sources... shortfalls or carryovers. (iv) The amount of excess cash flow or excess spread and the disposition of excess cash flow. (4) Beginning and ending principal balances of the asset-backed securities. (5) Interest...

  15. 75 FR 1583 - Notice of Open Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ... and public sector entities that played critical roles in the crisis will testify. DATES: The open... documents other than rules #0;or proposed rules that are applicable to the public. Notices of hearings #0... public hearing, in which the Commission will begin its thorough examination of the root causes of the...

  16. Endocrine and exocrine function of the bovine testis. Chapter 2

    USDA-ARS?s Scientific Manuscript database

    This chapter is devoted to the endocrine and exocrine function of the normal bovine male testes. The discussion begins with a historical review of the literature dating back to Aristotle’s (300 BC) initial description of the anatomy of the mammalian testes. The first microscopic examination of the t...

  17. 26 CFR 1.25A-0 - Table of contents.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Credit and Lifetime Learning Credit. (1) In general. (2) Hope Scholarship Credit. (3) Lifetime Learning... conviction. (2) Examples. (e) Academic period for prepayments. (1) In general. (2) Example. (f) Effective date. § 1.25A-4Lifetime Learning Credit (a) Amount of the credit. (1) Taxable years beginning before...

  18. 26 CFR 1.25A-0 - Table of contents.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Credit and Lifetime Learning Credit. (1) In general. (2) Hope Scholarship Credit. (3) Lifetime Learning... conviction. (2) Examples. (e) Academic period for prepayments. (1) In general. (2) Example. (f) Effective date. § 1.25A-4Lifetime Learning Credit (a) Amount of the credit. (1) Taxable years beginning before...

  19. 26 CFR 1.25A-0 - Table of contents.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Credit and Lifetime Learning Credit. (1) In general. (2) Hope Scholarship Credit. (3) Lifetime Learning... conviction. (2) Examples. (e) Academic period for prepayments. (1) In general. (2) Example. (f) Effective date. § 1.25A-4Lifetime Learning Credit (a) Amount of the credit. (1) Taxable years beginning before...

  20. 26 CFR 1.25A-0 - Table of contents.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Credit and Lifetime Learning Credit. (1) In general. (2) Hope Scholarship Credit. (3) Lifetime Learning... conviction. (2) Examples. (e) Academic period for prepayments. (1) In general. (2) Example. (f) Effective date. § 1.25A-4Lifetime Learning Credit (a) Amount of the credit. (1) Taxable years beginning before...

  1. 26 CFR 1.475(g)-1 - Effective dates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) (concerning the dealer-customer relationship) applies to taxable years beginning on or after January 1, 1995. (i) [Reserved] (ii) Section 1.475(c)-1(a)(2)(ii) (illustrating rules concerning the dealer-customer... relationships for purposes of determining whether equity interests in related persons are prohibited from being...

  2. 76 FR 67376 - Anglers for Christ Ministries, Inc., New Beginning Ministries; Petitioners; Interpretation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 79 [CG Docket No. 06-181; FCC 11-159] Anglers for... Standard AGENCY: Federal Communications Commission. ACTION: Interim rule. SUMMARY: In this document, the... intended by the Communications Act (Act). DATES: Effective November 1, 2011. FOR FURTHER INFORMATION...

  3. Exercises of Practical Life: Introduction and List

    ERIC Educational Resources Information Center

    Joosten, A. M.

    2013-01-01

    Albert Joosten wrote this article in 1968, and it is still the most comprehensive article on practical life to date. He develops his thesis beginning with "daily activities" leading to "developmental and creative activities." At the same time, Mr. Joosten establishes the psychological backdrop for the practical life exercises…

  4. 50 CFR 20.61 - Importation limits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... foreign country except Mexico, during any one calendar week beginning on Sunday, not to exceed 25 doves...) From Mexico, not to exceed the maximum number permitted by Mexican authorities to be taken in any one day: Provided, That if the importer has his Mexican hunting permit date-stamped by appropriate Mexican...

  5. 20 CFR 218.37 - When a supplemental annuity ends.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false When a supplemental annuity ends. 218.37... ANNUITY BEGINNING AND ENDING DATES When an Annuity Ends § 218.37 When a supplemental annuity ends. A supplemental annuity ends when the employee age or disability annuity ends. ...

  6. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  7. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  8. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  9. 47 CFR 25.121 - License term and renewals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... specified in the instrument of authorization. (d) Space stations. (1) For geostationary satellite orbit...-geostationary satellite orbit satellites, the license term will begin at 3 a.m. EST on the date that the... system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90...

  10. Bidding Documents for Asbestos Abatement in Oklahoma Public Buildings.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Education, Oklahoma City.

    All relevant specifications and forms for the removal of asbestos from Oklahoma public buildings are consolidated in this document. The specifications cover the entire procedure for asbestos removal beginning with solicitation for bids; contractor's responsibilities concerning date of completion, general cleanup, laying out work, wage scale, and…

  11. 77 FR 60655 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ...-1038; Directorate Identifier 2011-NM-166-AD] RIN 2120-AA64 Airworthiness Directives; Airbus Airplanes...-2012-1038; Directorate Identifier 2011-NM-166-AD'' at the beginning of your comments. We specifically...: Docket No. FAA-2012-1038; Directorate Identifier 2011-NM- 166-AD. (a) Comments Due Date We must receive...

  12. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  13. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  14. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  15. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  16. A "Quick & Dirty" Strategic Audit

    ERIC Educational Resources Information Center

    Brawley, Dorothy E.

    2016-01-01

    In teaching Strategic Management, it is imperative that students first learn how to audit the firm before they begin analysis, planning and implementation. Unfortunately this is a step often overlooked. Without a complete and up to date audit, any analysis conducted would have questionable validity and reliability. This report focuses on an…

  17. 5 CFR 870.704 - Amount of Option A.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) FEDERAL EMPLOYEES' GROUP LIFE INSURANCE PROGRAM Annuitants and Compensationers § 870.704 Amount... amount each month up to a maximum reduction of 75 percent. This reduction starts at the beginning of the... after the date of the insured's 65th birthday, whichever is later. (c) Paragraph (b) of this section...

  18. 5 CFR 550.806 - Interest computations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... agency shall compound interest by dividing the applicable interest rate (expressed as a decimal) by 365... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Interest computations. 550.806 Section... ADMINISTRATION (GENERAL) Back Pay § 550.806 Interest computations. (a)(1) Interest begins to accrue on the date...

  19. 9 CFR 124.40 - Request for hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Diligence Hearing § 124.40 Request for hearing. (a) Any interested person may request, within 60 days beginning on the date of publication of a due diligence determination by APHIS in accordance with § 124.32, that APHIS conduct an informal hearing on the due diligence determination. (b) The request for a...

  20. Reversing the Underachievement of Gifted Middle School Students: Lessons from Another Field

    ERIC Educational Resources Information Center

    Ritchotte, Jennifer; Rubenstein, Lisa; Murry, Francie

    2015-01-01

    Underachievement often begins in middle school for gifted students. Unfortunately, there is no single intervention that will ameliorate underachievement for all gifted students. To date, interventions aimed at reversing the underachieving behaviors of gifted middle school students have been inconsistent and inconclusive. To create an effective…

  1. 76 FR 58728 - Proposed Establishment of Class E Airspace; Oneonta, AL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... the beginning of your comments. You may also submit and review received comments through the Internet... phone number). You may also submit comments through the Internet at http://www.regulations.gov... returned to the commenter. All communications received before the specified closing date for comments will...

  2. 76 FR 12298 - Proposed Amendment of Class E Airspace; Orangeburg, SC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ..., at the beginning of your comments. You may also submit and review received comments through the... phone number). You may also submit comments through the Internet at http://www.regulations.gov... returned to the commenter. All communications received before the specified closing date for comments will...

  3. 45 CFR 671.11 - Waste storage.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... containers or tanks labeled to indicate their contents and the beginning date of accumulation of such waste... McMurdo Station or other disposition, for a period not to exceed 28 months; (4) Containers holding... ability of the containers to contain such waste is not impaired; (iii) Stored in a manner that allows...

  4. 45 CFR 671.11 - Waste storage.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... containers or tanks labeled to indicate their contents and the beginning date of accumulation of such waste... McMurdo Station or other disposition, for a period not to exceed 28 months; (4) Containers holding... ability of the containers to contain such waste is not impaired; (iii) Stored in a manner that allows...

  5. 45 CFR 671.11 - Waste storage.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... containers or tanks labeled to indicate their contents and the beginning date of accumulation of such waste... McMurdo Station or other disposition, for a period not to exceed 28 months; (4) Containers holding... ability of the containers to contain such waste is not impaired; (iii) Stored in a manner that allows...

  6. 45 CFR 671.11 - Waste storage.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... containers or tanks labeled to indicate their contents and the beginning date of accumulation of such waste... McMurdo Station or other disposition, for a period not to exceed 28 months; (4) Containers holding... ability of the containers to contain such waste is not impaired; (iii) Stored in a manner that allows...

  7. Reflections on "Real-World" Community Psychology

    ERIC Educational Resources Information Center

    Wolff, Tom; Swift, Carolyn

    2008-01-01

    Reflections on the history of real-world (applied) community psychologists trace their participation in the field's official guild, the Society for Community Research and Action (SCRA), beginning with the Swampscott Conference in 1965 through the current date. Four benchmarks are examined. The issues these real-world psychologists bring to the…

  8. 75 FR 34450 - FCC to Hold Open Commission Meeting Thursday, June 17, 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... FEDERAL COMMUNICATIONS COMMISSION FCC to Hold Open Commission Meeting Thursday, June 17, 2010 DATES: June 10, 2010. The Federal Communications Commission will hold an Open Meeting on the subject... consider a Notice of Inquiry to begin an open, public process to consider possible legal frameworks for...

  9. Translation: Elements of a Craft.

    ERIC Educational Resources Information Center

    Heiderson, Mazin A.

    An overview of the skills, techniques, tools, and compensation of language translators and interpreters is offered. It begins with a definition of translation and a brief history of translation in the western world. Basic principles of translation dating back to Roman writers are also outlined. A five-step process in producing a good translation…

  10. 20 CFR 212.5 - Verification of military service.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 1 2010-04-01 2010-04-01 false Verification of military service. 212.5... MILITARY SERVICE § 212.5 Verification of military service. Military service may be verified by the... armed forces that shows the beginning and ending dates of the individual's active military service; or a...

  11. Alternative Transportation in Parks and Public Lands (ATPPL) Program* Review : Summary and Results of Transportation Assistance Group (TAG) Activities Conducted to Date.

    DOT National Transportation Integrated Search

    2008-12-31

    Beginning in late 2006, the Alternative Transportation in Parks and Public Lands (ATPPL) Program jointly administered by the Federal Transit Administration (FTA) and the Department of the Interior (DOI) conducted a number of site-specific Tra...

  12. 75 FR 68329 - Meeting of the Defense Audit Advisory Committee (DAAC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... DEPARTMENT OF DEFENSE Office of the Secretary Meeting of the Defense Audit Advisory Committee... Defense Audit Advisory Committee will be held. DATES: Monday, November 22, 2010 beginning at 3 p.m. and... of internal controls, audit processes, and processes for monitoring compliance with relevant laws and...

  13. 12 CFR 702.202 - Prompt corrective action for “undercapitalized” credit unions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... open new branches; (4) Restrict member business loans. Beginning the effective date of classification as “undercapitalized” or lower, not increase the total dollar amount of member business loans..., branching, new lines of business. Prohibit a credit union from, directly or indirectly, acquiring any...

  14. MANUAL: BEST MANAGEMENT PRACTICES FOR POLLUTION PREVENTION IN THE TEXTILE INDUSTRY

    EPA Science Inventory

    Textiles is one the nation's oldest industries, dating back to the beginning of the American Industrial revolution in the 1790s. Despite perceptions of the decline of U.S. textile manufacturing in the face of offshore competition, the industry remains one of the largest, most di...

  15. 7 CFR 1416.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... milk for human consumption that were at least 2 years old and used for breeding dairy cows on the... providing milk for human consumption that had delivered one or more offspring before the beginning date of... male bovine livestock, of a breed used for the purpose of providing milk for human consumption, that...

  16. 7 CFR 1416.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... milk for human consumption that were at least 2 years old and used for breeding dairy cows on the... providing milk for human consumption that had delivered one or more offspring before the beginning date of... male bovine livestock, of a breed used for the purpose of providing milk for human consumption, that...

  17. 7 CFR 760.1102 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... period. Adult dairy cow means a female bovine animal used for the purpose of providing milk for human... milk for human consumption, that weighed 500 pounds or more on the beginning date of the disaster... omnivorous pig, hog, and boar. Swine are further delineated by sex and weight as determined by FSA. ...

  18. 7 CFR 1416.101 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... milk for human consumption that were at least 2 years old and used for breeding dairy cows on the... providing milk for human consumption that had delivered one or more offspring before the beginning date of... male bovine livestock, of a breed used for the purpose of providing milk for human consumption, that...

  19. 7 CFR 760.1102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... period. Adult dairy cow means a female bovine animal used for the purpose of providing milk for human... milk for human consumption, that weighed 500 pounds or more on the beginning date of the disaster... omnivorous pig, hog, and boar. Swine are further delineated by sex and weight as determined by FSA. ...

  20. 7 CFR 760.1102 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... period. Adult dairy cow means a female bovine animal used for the purpose of providing milk for human... milk for human consumption, that weighed 500 pounds or more on the beginning date of the disaster... omnivorous pig, hog, and boar. Swine are further delineated by sex and weight as determined by FSA. ...

  1. 26 CFR 1.469-11 - Effective date and transition rules.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... passive activity for any taxable year of the taxpayer beginning before January 1, 1988. (ii) Property... apply the rules in § 1.469-7 in computing the taxpayer's passive activity loss and passive activity... compute the taxpayer's passive activity loss and passive activity credit. Items from nonlending...

  2. Children and Adolescents: Should We Teach Them or Let Them Learn?

    ERIC Educational Resources Information Center

    Rohwer, William D., Jr.

    Research to date has provided too few answers for vital educational questions concerning teaching children or letting them learn. A basic problem is that experimentation usually begins by accepting conventional assumptions about schooling, ignoring experiments that would entail disturbing the ordering of current educational priorities.…

  3. Acoustic Engineering program at the Universidad Austral de Chile (UACh)

    NASA Astrophysics Data System (ADS)

    Sommerhoff, Jorge; Poblete, Victor; Arenas, Jorge P.

    2002-11-01

    From the beginning of the acoustics program at UACh in 1968, the studies of Acoustic Engineering have been modified and developed according to the vision and human resources of its developers. Three different stages of growth can be seen. When the program began, it was totally aimed at forming skilled professionals in audio and recording. In this way, the professional title given was Sound Engineer. At that time, each applicant was required to have ''good musical hearing,'' which had to be demonstrated through a special musical audition test. The second stage was characterized by the incorporation of acoustics subjects which allowed students, with no musical abilities, to competently work on acoustic engineering activities not related to music. Then, the professional title was changed to Acoustic Engineer. Thus, job opportunities were diversified and access was allowed by all types of students. In the last stage, the study plan was modified as a response to the new vision and requirements of the globalized world in which the environmental component has a great importance. In this work the development of a program that dates from 35 years ago is presented and justified.

  4. Anion exchange membrane fuel cells: Current status and remaining challenges

    NASA Astrophysics Data System (ADS)

    Gottesfeld, Shimshon; Dekel, Dario R.; Page, Miles; Bae, Chulsung; Yan, Yushan; Zelenay, Piotr; Kim, Yu Seung

    2018-01-01

    The anion exchange membrane fuel cell (AEMFC) is an attractive alternative to acidic proton exchange membrane fuel cells, which to date have required platinum-based catalysts, as well as acid-tolerant stack hardware. The AEMFC could use non-platinum-group metal catalysts and less expensive metal hardware thanks to the high pH of the electrolyte. Over the last decade, substantial progress has been made in improving the performance and durability of the AEMFC through the development of new materials and the optimization of system design and operation conditions. In this perspective article, we describe the current status of AEMFCs as having reached beginning of life performance very close to that of PEMFCs when using ultra-low loadings of Pt, while advancing towards operation on non-platinum-group metal catalysts alone. In the latter sections, we identify the remaining technical challenges, which require further research and development, focusing on the materials and operational factors that critically impact AEMFC performance and/or durability. These perspectives may provide useful insights for the development of next-generation of AEMFCs.

  5. Completely device-independent quantum key distribution

    NASA Astrophysics Data System (ADS)

    Aguilar, Edgar A.; Ramanathan, Ravishankar; Kofler, Johannes; Pawłowski, Marcin

    2016-08-01

    Quantum key distribution (QKD) is a provably secure way for two distant parties to establish a common secret key, which then can be used in a classical cryptographic scheme. Using quantum entanglement, one can reduce the necessary assumptions that the parties have to make about their devices, giving rise to device-independent QKD (DIQKD). However, in all existing protocols to date the parties need to have an initial (at least partially) random seed as a resource. In this work, we show that this requirement can be dropped. Using recent advances in the fields of randomness amplification and randomness expansion, we demonstrate that it is sufficient for the message the parties want to communicate to be (partially) unknown to the adversaries—an assumption without which any type of cryptography would be pointless to begin with. One party can use her secret message to locally generate a secret sequence of bits, which can then be openly used by herself and the other party in a DIQKD protocol. Hence our work reduces the requirements needed to perform secure DIQKD and establish safe communication.

  6. Climate change is affecting altitudinal migrants and hibernating species.

    PubMed

    Inouye, D W; Barr, B; Armitage, K B; Inouye, B D

    2000-02-15

    Calendar date of the beginning of the growing season at high altitude in the Colorado Rocky Mountains is variable but has not changed significantly over the past 25 years. This result differs from growing evidence from low altitudes that climate change is resulting in a longer growing season, earlier migrations, and earlier reproduction in a variety of taxa. At our study site, the beginning of the growing season is controlled by melting of the previous winter's snowpack. Despite a trend for warmer spring temperatures the average date of snowmelt has not changed, perhaps because of the trend for increased winter precipitation. This disjunction between phenology at low and high altitudes may create problems for species, such as many birds, that migrate over altitudinal gradients. We present data indicating that this already may be true for American robins, which are arriving 14 days earlier than they did in 1981; the interval between arrival date and the first date of bare ground has grown by 18 days. We also report evidence for an effect of climate change on hibernation behavior; yellow-bellied marmots are emerging 38 days earlier than 23 years ago, apparently in response to warmer spring air temperatures. Migrants and hibernators may experience problems as a consequence of these changes in phenology, which may be exacerbated if climate models are correct in their predictions of increased winter snowfall in our study area. The trends we report for earlier formation of permanent snowpack and for a longer period of snow cover also have implications for hibernating species.

  7. Climate change is affecting altitudinal migrants and hibernating species

    PubMed Central

    Inouye, David W.; Barr, Billy; Armitage, Kenneth B.; Inouye, Brian D.

    2000-01-01

    Calendar date of the beginning of the growing season at high altitude in the Colorado Rocky Mountains is variable but has not changed significantly over the past 25 years. This result differs from growing evidence from low altitudes that climate change is resulting in a longer growing season, earlier migrations, and earlier reproduction in a variety of taxa. At our study site, the beginning of the growing season is controlled by melting of the previous winter's snowpack. Despite a trend for warmer spring temperatures the average date of snowmelt has not changed, perhaps because of the trend for increased winter precipitation. This disjunction between phenology at low and high altitudes may create problems for species, such as many birds, that migrate over altitudinal gradients. We present data indicating that this already may be true for American robins, which are arriving 14 days earlier than they did in 1981; the interval between arrival date and the first date of bare ground has grown by 18 days. We also report evidence for an effect of climate change on hibernation behavior; yellow-bellied marmots are emerging 38 days earlier than 23 years ago, apparently in response to warmer spring air temperatures. Migrants and hibernators may experience problems as a consequence of these changes in phenology, which may be exacerbated if climate models are correct in their predictions of increased winter snowfall in our study area. The trends we report for earlier formation of permanent snowpack and for a longer period of snow cover also have implications for hibernating species. PMID:10677510

  8. An operational monitoring and display system for phenological observations

    NASA Astrophysics Data System (ADS)

    Scheifinger, Helfried; Koch, Elisabeth

    2013-04-01

    Some national weather services operate a special web interface, where citizens can enter their phenological observations. Such a system opens the opportunity to immediately display the current state of the seasonal vegetation development. Here a few simple tools are introduced to evaluate and display near real time phenological observations with respect to the interannual variability and trends over the last decades. For many phenological phases continuous time series since 1946 are available in Austria, which is a time period sufficiently long to study the climate impact on phenology. Phenological observations can be entered in near real time via the ZAMG web - portal or be digitised after the season from the observer sheets with a considerable time lag. About 30% to 50% of the total phenological data stem from the near real time system, which can be used for near real time monitoring of the phenological season. The minimum number of observations, which must be available for inclusion in the procedure has arbitrarily been set to 12 in order to allow a reasonable height regression. The system installed at the ZAMG produces a nightly update of the statistical analysis and figures, which can then for instance be summarised for a news release. At the moment there is no spatial differentiation possible. All conclusions and figures are based on phenological entry dates over all Austrian observations, which have been standardised to an arbitrary station elevation of 200 m above sea level via height regression. The 2012 Austrian phenological season in relation to 1946 - 2011 The cold period from end of January to beginning of February 2012 in Austria has also left its marks on the phenological season. The early phases like beginning of flowering of snow drop, hazel or willow are to be found in the median position of rank 32 of 67 years since 1946. The remainder of the 2012 season generally shows rather early entry dates. On average the phenological entry dates range at rank 11 of the 67 years since 1946. In other words, the 2012 season belongs to the 15 earliest of the last 67 years. The entry dates have remained at about the same early level during the last decade. Long continuous time series of autumn phases are available only from apple at the moment. Beginning of leaf colouring ranges at rank 45 of 63 years and begin of leaf fall at 60 of 63 years (both since 1950), which is rather late to very late. For trend calculations all phases are included, which possess a complete time series from 1946 to 2012. All 20 selected phases show a trend towards earlier entry dates, 14 of them a significant trend (at the 90% level according to Mann - Kendall). The mean trend over all 20 phenological phases is -4.1 days/decade. During the last 5 to 15 years the trend has remained constant in case of most phases.

  9. AVHRR composite period selection for land cover classification

    USGS Publications Warehouse

    Maxwell, S.K.; Hoffer, R.M.; Chapman, P.L.

    2002-01-01

    Multitemporal satellite image datasets provide valuable information on the phenological characteristics of vegetation, thereby significantly increasing the accuracy of cover type classifications compared to single date classifications. However, the processing of these datasets can become very complex when dealing with multitemporal data combined with multispectral data. Advanced Very High Resolution Radiometer (AVHRR) biweekly composite data are commonly used to classify land cover over large regions. Selecting a subset of these biweekly composite periods may be required to reduce the complexity and cost of land cover mapping. The objective of our research was to evaluate the effect of reducing the number of composite periods and altering the spacing of those composite periods on classification accuracy. Because inter-annual variability can have a major impact on classification results, 5 years of AVHRR data were evaluated. AVHRR biweekly composite images for spectral channels 1-4 (visible, near-infrared and two thermal bands) covering the entire growing season were used to classify 14 cover types over the entire state of Colorado for each of five different years. A supervised classification method was applied to maintain consistent procedures for each case tested. Results indicate that the number of composite periods can be halved-reduced from 14 composite dates to seven composite dates-without significantly reducing overall classification accuracy (80.4% Kappa accuracy for the 14-composite data-set as compared to 80.0% for a seven-composite dataset). At least seven composite periods were required to ensure the classification accuracy was not affected by inter-annual variability due to climate fluctuations. Concentrating more composites near the beginning and end of the growing season, as compared to using evenly spaced time periods, consistently produced slightly higher classification values over the 5 years tested (average Kappa) of 80.3% for the heavy early/late case as compared to 79.0% for the alternate dataset case).

  10. Lupus mastitis as a first manifestation of systemic disease: About two cases with a review of the literature.

    PubMed

    Voizard, Béatrice; Lalonde, Lucie; Sanchez, Lilia Maria; Richard-Chesnay, Johanne; David, Julie; Labelle, Maude; El Khoury, Mona; Trop, Isabelle

    2017-07-01

    Lupus mastitis is an uncommon manifestation of systemic lupus erythematosus (SLE) that affects the subcutaneous fat in the breast, much like lupus panniculitis, but additionally involves the mammary gland. We report on two women for whom lupus mastitis was the initial manifestation of SLE and provide a literature review of 34 additional cases reported in the Anglo-Saxon and French literature since 1971, making this the largest review to date. Lupus mastitis (LM) can manifest clinically as subcutaneous masses that may be painful, or may present cutaneous involvement such as thickening and discolouration. The radiologic manifestations of LM are broad and include calcifications, masses and asymmetries. Most often, excluding malignancy requires percutaneous biopsy, with histologic findings that are virtually pathognomonic for SLE. Thus, surgery is avoided and medical management can begin, antimalarial drugs and corticosteroids in most cases. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. Finite Progressive Planning for the Assembly Process in Footwear

    NASA Astrophysics Data System (ADS)

    Reyes, John; Aldás, Darwin; Salazar, Edisson; Armendáriz, Evelyn; Álvarez, Kevin; Núñez, José; García, Mario

    2017-06-01

    The scheduling of the operations of a manufacturing system is recognized for its efficiency in establishing a characteristic rate of production based on the forecasting of the ending date of an order. However, progressive planning focused on the footwear industries has not been studied in detail, since it is limited by the use of machines and supply according to the demand of the production line, whose development is based on just in time. The study proposes a finite progressive planning model in the area of footwear assembly that begins with analysis of the demand and identification of manufacturing constraints in order to establish an optimal ordering sequence. The results show manufacturing requirements through production orders that automatically determine production shifts per order, through experimentation of scenarios, the 25% increase in productivity indicators and a 31% improvement in efficiency are established. This improvement represents higher benefits for the industrial sector when establishing planning in the workplace.

  12. An investigation of young girls' responses to sexualized images.

    PubMed

    Jongenelis, Michelle I; Pettigrew, Simone; Byrne, Susan M; Biagioni, Nicole

    2016-12-01

    Evidence suggests that the sexualization of girls has increased and become more explicit in recent years. However, most of the research conducted to date has focused on sexualization in adults. To address this research gap, this study explored how young Australian girls respond to and describe sexualized and non-sexualized depictions of their peers. Results from 42 girls aged 6-11 years revealed that sexualization was a perceptually salient attribute, with participants readily classifying sexualized girls as a subgroup. Participants also made distinct trait attributions based on the differences between sexualized and non-sexualized girls. The results suggest that young girls respond differently to sexualized and non-sexualized depictions of their peers and are beginning to develop stereotypes based on these depictions. As such, the implementation of media literacy programs in adolescence may be too late and efforts may be required to address this issue among younger children. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Ultrasound in space

    NASA Technical Reports Server (NTRS)

    Martin, David S.; South, Donna A.; Garcia, Kathleen M.; Arbeille, Philippe

    2003-01-01

    Physiology of the human body in space has been a major concern for space-faring nations since the beginning of the space era. Ultrasound (US) is one of the most cost effective and versatile forms of medical imaging. As such, its use in characterizing microgravity-induced changes in physiology is being realized. In addition to the use of US in related ground-based studies, equipment has also been modified to fly in space. This involves alteration to handle the stresses of launch and different power and cooling requirements. Study protocols also have been altered to accommodate the microgravity environment. Ultrasound studies to date have shown a pattern of adaptation to microgravity that includes changes in cardiac chamber sizes and vertebral spacing. Ultrasound has been and will continue to be an important component in the investigation of physiological and, possibly, pathologic changes occurring in space or as a result of spaceflight.

  14. 40 CFR 280.91 - Compliance dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Compliance dates. 280.91 Section 280... (UST) Financial Responsibility § 280.91 Compliance dates. Owners of petroleum underground storage tanks are required to comply with the requirements of this subpart by the following dates: (a) All petroleum...

  15. 76 FR 80226 - Technical Amendments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... final rule, effective upon publication. Generally, the Administrative Procedure Act (APA) requires a.... Additionally, the APA requires that a final rule must have a delayed effective date of 30 days from the date of... delayed effective date requirement under the APA. 5 U.S.C. 553(d)(3). Again the technical change conforms...

  16. 24 CFR 291.306 - Closing requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Closing requirements. 291.306...-Held Single Family Mortgage Loans § 291.306 Closing requirements. (a) Closing date payment. On the closing date, the purchaser must pay to HUD the closing date payment, consisting of the balance of the...

  17. 17 CFR 230.417 - Date of financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Date of financial statements... RULES AND REGULATIONS, SECURITIES ACT OF 1933 General Requirements § 230.417 Date of financial statements. Whenever financial statements of any person are required to be furnished as of a date within a...

  18. 40 CFR 1043.5 - Effective dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Effective dates. 1043.5 Section 1043.5... Effective dates. (a) The requirement of APPS for marine vessels to comply with Annex VI of the MARPOL... 1, 2010, although some requirements do not become applicable until later dates. (c) Compliance with...

  19. 26 CFR 1.25A-3 - Hope Scholarship Credit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... academic period beginning in the taxable year (or treated as beginning in the taxable year, see § 1.25A-5(e...) Degree requirement. For at least one academic period that begins during the taxable year, the student... least one academic period that begins during the taxable year, the student enrolls for at least one-half...

  20. AMS applications to the paleoclimate changing study in China

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, K.; Chen, T.M.; Yuan, D.X.

    1995-12-01

    To study the paleoclimates changing in China, a high-resolution AMS radio-carbon dating of a loess profile at Weinan, Shaanxi Province, has been carried out and an age of 10,300 BP has been assigned to be the beginning of the HOLOCENE in the studied areas. In the south of China, a stalagmite of 1.2-m high taken from Panlong-dong cave, Guilin, Guangxi Province, has also been studied. The dating with micro-stratification sampling shows that the climate in HOLOCENE was generally damp and warm, but there was a short cola period during 10-11 Ka BP. The resolution of AMS carbon dating of stalagmitemore » is 100 years for the warm and damp period and 500 years for the dry and cold period.« less

  1. 5 CFR 353.203 - Length of service.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the 5-year total, but all service beginning with that date would count. (c) Nature of Reserve service and resolving conflicts. An employee who is a member of the Reserve or National Guard has a dual obligation—to the military and to his or her employer. Given the nature of the employee's service obligation...

  2. 26 CFR 1.9006 - Statutory provisions; Tax Reform Act of 1969.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... is attributable to the amendments made by this Act, shall be assessed or collected for any period... reason of the amendments made by this Act, such amount or additional amount shall be paid ratably on or before each of the remaining installment dates for the taxable year beginning with the first installment...

  3. 77 FR 68797 - New York; Emergency and Related Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    .... FEMA-3351-EM; Docket ID FEMA-2012-0002] New York; Emergency and Related Determinations AGENCY: Federal... of an emergency for the State of New York (FEMA-3351-EM), dated October 28, 2012, and related... determined that the emergency conditions in the State of New York resulting from Hurricane Sandy beginning on...

  4. 20 CFR 220.21 - Initial evaluation of a previous occupational disability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... his left leg in an automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the claimant underwent 2 surgical procedures which restored the functional use of his... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  5. 20 CFR 220.21 - Initial evaluation of a previous occupational disability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... his left leg in an automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the claimant underwent 2 surgical procedures which restored the functional use of his... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  6. 20 CFR 220.21 - Initial evaluation of a previous occupational disability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... his left leg in an automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the claimant underwent 2 surgical procedures which restored the functional use of his... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  7. 20 CFR 220.21 - Initial evaluation of a previous occupational disability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... his left leg in an automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the claimant underwent 2 surgical procedures which restored the functional use of his... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  8. 20 CFR 220.21 - Initial evaluation of a previous occupational disability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... his left leg in an automobile accident which occurred on June 16, 1982. For a period of 18 months following the accident the claimant underwent 2 surgical procedures which restored the functional use of his... facts disclosed above, beginning June 16, 1982 (the date of the automobile accident). The claimant files...

  9. Periodic Inspections of Kahului and Laupahoehoe Breakwaters, Hawaii

    DTIC Science & Technology

    1994-09-01

    the sea-side of the head and trunk of the west breakwater is beginning to show a slight concentration, or cluster , of breakage and this area should...type of Survey; AERIAL Date Survey Morthing(Y) ft. Easti( gmX ) ft. ELev.(Z) ft. Relative Movement (TXZ) Cumulative Movemenit (YX2) 93/01/08 AERIAL

  10. 18 CFR 292.205 - Criteria for qualifying cogeneration facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... standard. For any topping-cycle cogeneration facility, the useful thermal energy output of the facility... thermal energy output, during the 12-month period beginning with the date the facility first produces... total energy input of natural gas and oil to the facility; or (B) If the useful thermal energy output is...

  11. 47 CFR 22.947 - Five year build-out period.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MOBILE SERVICES Cellular Radiotelephone Service § 22.947 Five year build-out period. Except for systems...-out period, the licensee of the first cellular system on each channel block in each market may enter...-out period begins on the date the initial authorization for the first cellular system is granted, and...

  12. BEGINNING TAGALOG, A COURSE FOR SPEAKERS OF ENGLISH.

    ERIC Educational Resources Information Center

    BOWEN, J. DONALD; AND OTHERS

    THE TWO MAJOR GOALS OF THIS COMPREHENSIVE COURSE ARE--FIRST, AN ORAL CONTROL OF TAGALOG AND SUFFICIENT MASTERY OF ITS STRUCTURE TO CONTINUE INDEPENDENT STUDY, AND SECOND, PRESENTATION OF UP-TO-DATE INFORMATION ABOUT THE SOCIAL CUSTOMS, STANDARDS, VALUES, AND ASPIRATIONS OF THE FILIPINO PEOPLE SO THAT THE LANGUAGE LEARNER MAY PARTICIPATE FULLY IN…

  13. 40 CFR 96.104 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... through HH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR NOX unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  14. 40 CFR 96.104 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... through HH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR NOX unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  15. 40 CFR 96.204 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... through HHH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR SO2 unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  16. 40 CFR 96.104 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... through HH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR NOX unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  17. 40 CFR 96.204 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... through HHH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR SO2 unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  18. 40 CFR 96.204 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... through HHH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR SO2 unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  19. 40 CFR 96.104 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... through HH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR NOX unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  20. 40 CFR 96.204 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... through HHH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR SO2 unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  1. 40 CFR 96.104 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... through HH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR NOX unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  2. 40 CFR 96.204 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... through HHH of this part: any stationary, fossil-fuel-fired boiler or stationary, fossil-fuel-fired... section, is not a CAIR SO2 unit begins to combust fossil fuel or to serve a generator with nameplate... provided in paragraph (a)(1) of this section on the first date on which it both combusts fossil fuel and...

  3. 7 CFR 760.304 - Covered livestock.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... producer: (i) During the 60 days prior to the beginning date of a qualifying drought or fire: (A) Owned, (B...) Sold or otherwise disposed of due to qualifying drought during: (A) The current production year or (B... qualifying drought or fire; (5) Not have been produced and maintained for reasons other than commercial use...

  4. 7 CFR 760.303 - Eligible livestock producer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must: (1) During the 60 days prior to the beginning date of a qualifying drought or fire, own, cash or... county affected by a qualifying drought during the normal grazing period for the county or (ii) Rangeland... qualifying drought or fire to be eligible for LFP payments. (c) An eligible livestock producer does not...

  5. 7 CFR 760.304 - Covered livestock.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... producer: (i) During the 60 days prior to the beginning date of a qualifying drought or fire: (A) Owned, (B...) Sold or otherwise disposed of due to qualifying drought during: (A) The current production year or (B... qualifying drought or fire; (5) Not have been produced and maintained for reasons other than commercial use...

  6. 7 CFR 760.303 - Eligible livestock producer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must: (1) During the 60 days prior to the beginning date of a qualifying drought or fire, own, cash or... county affected by a qualifying drought during the normal grazing period for the county or (ii) Rangeland... qualifying drought or fire to be eligible for LFP payments. (c) An eligible livestock producer does not...

  7. 7 CFR 760.303 - Eligible livestock producer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... must: (1) During the 60 days prior to the beginning date of a qualifying drought or fire, own, cash or... county affected by a qualifying drought during the normal grazing period for the county or (ii) Rangeland... qualifying drought or fire to be eligible for LFP payments. (c) An eligible livestock producer does not...

  8. 7 CFR 760.304 - Covered livestock.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... producer: (i) During the 60 days prior to the beginning date of a qualifying drought or fire: (A) Owned, (B...) Sold or otherwise disposed of due to qualifying drought during: (A) The current production year or (B... qualifying drought or fire; (5) Not have been produced and maintained for reasons other than commercial use...

  9. 7 CFR 760.303 - Eligible livestock producer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... must: (1) During the 60 days prior to the beginning date of a qualifying drought or fire, own, cash or... county affected by a qualifying drought during the normal grazing period for the county or (ii) Rangeland... qualifying drought or fire to be eligible for LFP payments. (c) An eligible livestock producer does not...

  10. 7 CFR 760.304 - Covered livestock.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... producer: (i) During the 60 days prior to the beginning date of a qualifying drought or fire: (A) Owned, (B...) Sold or otherwise disposed of due to qualifying drought during: (A) The current production year or (B... qualifying drought or fire; (5) Not have been produced and maintained for reasons other than commercial use...

  11. 7 CFR 760.303 - Eligible livestock producer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must: (1) During the 60 days prior to the beginning date of a qualifying drought or fire, own, cash or... county affected by a qualifying drought during the normal grazing period for the county or (ii) Rangeland... qualifying drought or fire to be eligible for LFP payments. (c) An eligible livestock producer does not...

  12. Effect of Long-Term Cannabis Use on Axonal Fibre Connectivity

    ERIC Educational Resources Information Center

    Zalesky, Andrew; Solowij, Nadia; Yucel, Murat; Lubman, Dan I.; Takagi, Michael; Harding, Ian H.; Lorenzetti, Valentina; Wang, Ruopeng; Searle, Karissa; Pantelis, Christos; Seal, Marc

    2012-01-01

    Cannabis use typically begins during adolescence and early adulthood, a period when cannabinoid receptors are still abundant in white matter pathways across the brain. However, few studies to date have explored the impact of regular cannabis use on white matter structure, with no previous studies examining its impact on axonal connectivity. The…

  13. 7 CFR 1416.101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Adult beef bulls means male bovine animals that were at least 2 years old and used for breeding purposes... bred beef heifer shall also be considered an adult beef cow if it was pregnant on the beginning date of the disaster period. Adult buffalo and beefalo bulls means male animals of those breeds that were at...

  14. 7 CFR 760.302 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Adult beef bull means a male beef breed bovine animal that was at least 2 years old and used for breeding purposes on or before the beginning date of a qualifying drought or fire. Adult beef cow means a female beef breed bovine animal that had delivered one or more offspring. A first-time bred beef heifer...

  15. Development of the rules governing the strength of airplanes. Part III : loading conditions in France, Italy, Holland, and Russia - aims at standardization

    NASA Technical Reports Server (NTRS)

    Kussner, H G; Thalau, Karl

    1933-01-01

    The historical development of the rules for structural strength of aircraft in the leading countries is traced from the beginning of flight to date. The term "factor of safety" is critically analyzed; its replacement by probability considerations has been considered desirable.

  16. Effect of harvest dates on yield and nutritive value of eastern gamgrass

    USDA-ARS?s Scientific Manuscript database

    Yield of 'Pete' eastern gamagrass [Tripsacum dactyloides (L.) L.] was evaluated for 3 yr. Forage samples were harvested at 7-d intervals beginning on May 15 and ending on July 17, during 2000, 2001, and 2002. Samples from 2000 and 2001 were analyzed to determine nutrient composition. Canopy height i...

  17. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If the premining use of the land was changed within 5 years before the anticipated date of beginning... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  18. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If the premining use of the land was changed within 5 years before the anticipated date of beginning... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  19. 48 CFR 1352.219-71 - Notification to delay performance (Deviation).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... not begin performance under this purchase order until 2 working days have passed from the date of its... performance (Deviation). 1352.219-71 Section 1352.219-71 Federal Acquisition Regulations System DEPARTMENT OF....219-71 Notification to delay performance (Deviation). As prescribed in 48 CFR 1319.811-3(b), insert...

  20. Logistics in Motion: Supporting the March to the Rhine

    DTIC Science & Technology

    2016-05-17

    order to secure payment for the local property owners from the U.S. Army quartermasters at a later date. Medical personnel making the hike became... hike from the Argonne woods to Coblenz, making anywhere from twenty to fi f- ty four kilometers a day with full fi eld equipment. I couldn’t begin

Top