Science.gov

Sample records for resource planning environmental

  1. Environmental regulations alter resource planning methodology

    SciTech Connect

    Castro, R.D.

    1997-05-01

    The advent of regulations governing the volume of air pollutants emitted may force radical alterations in traditional economics-based resource planning. A review of the effect on regional resource planning of adopted emission rules for the Los Angeles basin may benefit utility resource planners. The 1990 amendments to the Clean Air Act (Amendments) concerning utility generation has prompted a reassessment of resource planning methodology. The current methodology does not account for the restrictive NOx emission limits imposed by the Amendments. A new procedure needs to be developed that considers environmental impacts in the selection of the most economical resource plan. Historically, economic aspects of dispatch and generation has dominated the focus of resource planners; for most of the larger utilities, resource planning usually entailed performing analyses with convolution-based production costing software. This method is used because it resolves the prohibitively large run times associated with the exhaustively comprehensive enumeration method of matching loads with resources. An alternative method of analysis, Monte Carlo, requires a larger number of iterations to achieve the precision of convolution. Additionally, the Monte Carlo method`s of convergence, as compared to the convolution method, is much more sensitive to the number of operating units, the number of operating states, the range of input data, and the convergence criteria.

  2. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... will evaluate different approaches for water resources management to determine the potential impacts on... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Prepare a Water Resources Management Plan/ Environmental Impact Statement for Mojave National...

  3. 76 FR 50494 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... National Park Service Water Resources Management Plan/Environmental Impact Statement, Mojave National... Scoping Period for Water Resources Management Plan/Environmental Impact Statement for Mojave National... National Park Service is preparing a Water Resources Management Plan/Environmental Impact Statement...

  4. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact Statement for the Lander Resource Management Plan Revision Project, Lander Field Office...: You may submit comments related to the Lander Resource Management Plan Revision Project by any of...

  5. 75 FR 25288 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... Environmental Impact Statement for the Pocatello Field Office, Idaho AGENCY: Bureau of Land Management, Interior... Management (BLM) has prepared a Proposed Resource Management Plan/Final Environmental Impact Statement... clarify proposed management direction and update the analysis of potential environmental impacts, but...

  6. 77 FR 74508 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... Environmental Impact Statement for the Ring of Fire Resource Management Plan--Haines Planning Area, Alaska... Amendment, 4700 BLM Road, Anchorage, Alaska 99507. Copies of the Draft RMP Amendment/Draft EIS are available... Area is located in southeast Alaska, and consists of approximately 320,000 acres of BLM-managed...

  7. 78 FR 45265 - Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental Assessment for Coal Lease by Application ALES-55199, AL AGENCY: Bureau of Land Management, Interior. ACTION: Notice. SUMMARY: The Bureau of Land Management (BLM) is preparing a Resource...

  8. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Intent published in the Federal Register (71 FR 30446). A Notice of Availability of the Draft RMP/Draft... Bureau of Land Management Notice of Availability of the Proposed Resource Management Plan and Final.... ACTION: Notice of availability. SUMMARY: In accordance with the National Environmental Policy Act...

  9. 77 FR 11154 - Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ..., subsistence, travel management, water quality, lands with wilderness characteristics, and wildlife. The Draft... Bureau of Land Management Notice of Availability for the Eastern Interior Draft Resource Management Plan/Environmental Impact Statement, Alaska AGENCY: Bureau of Land Management, Interior. ACTION: Notice...

  10. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Parks and Recreation (CDPR), as the California Environmental Quality Act State lead agency, have made available for public review and comment the San Luis Reservoir State Recreation Area Resource Management... California Department of Parks and Recreation was given the responsibility to plan, design,...

  11. Shaping the future: A strategic plan for natural resources and environmental management education

    SciTech Connect

    1994-02-01

    As the 21st century nears, the use of natural resources and the preservation of environmental quality are the focus of increased worldwide attention. The Cooperative Extension System (CES) thereby is presented with expanded opportunities and responsibilities for outreach education in natural resources and environmental management (NREM). To meet this challenge, a 17-member team of Extension professionals-selected to represent the geographic, academic, and cultural diversity of the CES-has prepared this report. This document is a plan to guide the Cooperative Extension System in strengthening programs in the area of natural resources and environmental management education. The implementation of this systemwide Strategic Plan and of similar state plans will expand the scope and effectiveness of NREM education and facilitate better service to diverse customers. State NREM support teams will be established to provide leadership, coordinate educational needs and priorities, and increase the resources available for NREM programming. A national NREM support team also will be formed to provide national coordination, resource development, and accountability.

  12. Ecological approach to resource survey and planning for environmentally significant areas: the ABC method

    SciTech Connect

    Bastedo, J.D.; Nelson, J.G.; Theberge, J.B.

    1984-03-01

    A resource survey and planning method for parks, reserves, and other environmentally significant areas (ESAs) is presented in the context of holistic balanced approach to land use and environmental management. This method provides a framework for the acquisition, analysis, presentation, and application of diverse ecological data pertinent to land use planning and resource management within ESAs. Through the independent analysis and subsequent integration of abiotic, biotic, and cultural or ABC information, land areas within an ESA are identified in terms of their relative environmental significance and environmental constraints. The former term encompasses wildlife, historic, and other resource values, while the latter term reflects biophysical hazards and sensitivities, and land use conflicts. The method thus calls for a matching of an ESA's distinctive attributes with appropriate land use and institutional arrangements through an analysis of available acts, regulations, agencies, and other conservation and land use management mechanisms. The method culminates with a management proposal showing proposed park or reserve allocations, buffer areas, or other land use controls aimed at preserving an ESA's special ecological qualities while providing for resource development. The authors suggest that all resource management decisions affecting ESA's should be governed by a philosophical stance that recognizes a spectrum of broad land use types, ranging from preservation to extractive use and rehabilitation.

  13. Grid-based modeling for land use planning and environmental resource mapping.

    SciTech Connect

    Kuiper, J. A.

    1999-08-04

    Geographic Information System (GIS) technology is used by land managers and natural resource planners for examining resource distribution and conducting project planning, often by visually interpreting spatial data representing environmental or regulatory variables. Frequently, many variables influence the decision-making process, and modeling can improve results with even a small investment of time and effort. Presented are several grid-based GIS modeling projects, including: (1) land use optimization under environmental and regulatory constraints; (2) identification of suitable wetland mitigation sites; and (3) predictive mapping of prehistoric cultural resource sites. As different as the applications are, each follows a similar process of problem conceptualization, implementation of a practical grid-based GIS model, and evaluation of results.

  14. Framework for Integrated Water, Energy, and Environmental Resources Assessment, Planning, and Management: Lake Victoria Case Study

    NASA Astrophysics Data System (ADS)

    Georgakakos, A.; Yao, H.; Tidwell, A.

    2006-12-01

    This article describes a recent assessment study for Lake Victoria in East Africa. The study includes three interlinked components. The first pertains to Lake Victoria regulation and includes climate and hydrologic forecasting (seasonal, inter-annual, and centennial), and outflow regulation (water resources planning). The second pertains to energy system planning, and the third to environmental and socio-economic impact assessments. These components converge at the operational level where water, energy, and environmental management are harmonized through the use of a decision support system, the Lake Victoria Decision Support Tool. Some of the broad study findings are summarized below: (1)Lake Victoria is entering a new era in which sustainable water resources management is tightly linked to and can only be achieved by proactive energy planning. To meet this new challenge, and maximize the benefit of the decision support system, water and energy sector decisions must be institutionally coordinated. (2)Climate and hydrologic forecasts of sufficient skill are critical for effective water resources and energy planning and management. More specifically, extensive assessments with several GCMs and climate scenarios indicate that Lake Victoria will most likely be adversely impacted by climate change with potentially serious local and regional consequences. Furthermore, seasonal and inter-annual forecasts are very important in meeting medium term water and energy demands and minimizing the costs of thermal energy generation. (3)Wetland ecological and socio-economic benefits are comparable to power sector benefits, underscoring the need for more comprehensive evaluations of non-power water uses and integrative water, energy, and environmental planning and management. (4)Integrated forecast-decision systems are excellent means to bring to bear and make practically available advances in various water-related disciplines for the benefit of managers and policy makers.

  15. Towards integrated water resources management in Colombia: challenges and opportunities for spatial environmental planning

    NASA Astrophysics Data System (ADS)

    Salazar, Sergio; Hernández, Sebastián

    2015-04-01

    Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of

  16. Issues and methods in incorporating environmental externalities into the integrated resource planning process

    SciTech Connect

    Fang, J.M.; Galen, P.S.

    1994-11-01

    This report is a review of current practices and policies in considering environmental externalities in the integrated resource planning and performance based regulation (IRP/PBR) process. The following issues are presented and examined: What are the pros and cons of treating environmental externalities in the IRP process? How are potential future environmental regulations being treated? Are externalities being qualitatively or quantitatively considered, or monetized? Are offsets being allowed? How are externality policies being coordinated among different levels and branches of governments? Should environmental externalities be considered in dispatching a utility`s existing resources? What are the procedures for addressing uncertainty in incorporating environmental externalities into IRP? How are externalities valued? What are other approaches to addressing environmental externalities. This report describes seven major approaches for addressing environmental externalities in the IRP process: qualitative treatment, weighting and ranking, cost of control, damage function, percentage adders, monetization by emission, and multiattribute trade-off analysis. The discussion includes a taxonomy of the full range of alternative methods for addressing environmental externalities, a summary of state PUC actions, the role of state laws, the debate on environmental adders, and the choice of methodologies. In addition, this report characterizes the interests of stakeholders such as the electric industry, fuel suppliers, energy consumers, governmental agencies, public interest groups, consultants, and others. It appears that the views, positions, and interests of these stakeholders are affected by their perceptions of the potential impacts on their economic interests or the viability of their position on environmental policy, by the societal perspective they take, and by the orientation of the analysts toward market competition and their respective accumulated expertise.

  17. 78 FR 65416 - Supplemental Environmental Impact Statement-Integrated Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ... scenario using a capacity planning model. The portfolios were ranked by several metrics including revenue... economy basis almost daily. Resource Planning Activities In April 2011, TVA completed the Integrated... to guide planning activities, Strategy R--Recommended Planning Direction, consisted of a range...

  18. 78 FR 16528 - Notice of Intent To Prepare a Cultural Resources Management Plan/Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Resources Management Plan/Environmental Impact Statement (CRMP/EIS) for Isle Royale National Park (ISRO... for future management of cultural resources at ISRO. This CRMP/EIS tiers from the 1998 General... ISRO enabling legislation and the National Historic Preservation Act (16 U.S.C. 470 et seq.), as...

  19. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  20. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect

    1995-08-01

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  1. 77 FR 35999 - Notice of Availability of the Proposed Resource Management Plan/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... Management Plan (RMP)/Final Environmental Impact Statement (EIS) for the Lower Sonoran (LS) and Sonoran... Avenue, Phoenix, Arizona 85027; email: blm_az_ls_sdnm_plan@blm.gov . Persons who use a telecommunications... business hours. SUPPLEMENTARY INFORMATION: Compact disks of the LS-SDNM were sent to the...

  2. The role of integrated resource planning, environmental externalities, and anticipation of future regulation in compliance planning under the Clean Air Act Amendments of 1990

    SciTech Connect

    Bernow, S.; Biewald, B.; Wulfsberg, K.

    1993-07-01

    Utilities are developing sulfur dioxide (SO{sub 2}) emission compliance plans to meet limitations of the Clean Air Act Amendments of 1990 (CAAA). Compliance plans will have long-term effects on resource selection, fuel choice, and system dispatch. Use of integrated resource planning (IRP) is necessary to ensure compliance plans are consistent with the overall societal goals. In particular, environmental externalities must be integrated with the compliance planning process. The focus of the CAAA is on air pollution reduction, specifically acid gases and toxics, and attainment of National Ambient Air Quality Standards (NAAQS) for criteria pollutants. Title IV specifically focuses on sulfur dioxide with a national allowance trading system, while further regulation of toxics and nitrogen oxides is slated for additional study. Yet, compliance planning based narrowly upon today`s environmental regulations could fail to meet the broad goals of IRP if a larger array of environmental externalities is excluded from the analysis. Compliance planning must consider a broad range of environmental effects from energy production and use to (1) protect society`s long-term stake in environmental quality, and (2) ensure that today`s plans are rich enough to accommodate potential changes in regulation and national environmental goals. The explicit recognition of environmental effects, such as those associated with CO{sub 2} release, will result in prudent compliance plans that take advantage of current opportunities for pollution avoidance and have long-term viability in the face of regulatory change. By including such considerations, the mix of resources acquired and operated (supply and demand, existing and new, conventional and renewable, fuel type and fuel quality, pollution control, and dispatch protocols) will be robust and truly least-cost.

  3. Human Resource Planning

    ERIC Educational Resources Information Center

    Hoffman, W. H.; Wyatt, L. L.

    1977-01-01

    By using the total resource approach, we have focused attention on the need to integrate human resource planning with other business plans and highlighted the importance of a productivity strategy. (Author)

  4. Planning Resource Guide.

    ERIC Educational Resources Information Center

    RP Group of California Community Colleges, Santa Ana.

    The Planning Resource Guide by the RP Group of California Community Colleges was created to provide practical planning assistance. It contains four sections, including: (1) a basic conceptual framework for planning; (2) common planning definitions for colleges; (3) planning steps and samples of planning structures; and (4) suggestions for linking…

  5. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  6. Nevada Environmental Studies Plan

    SciTech Connect

    1991-07-01

    The Nevada Environmental Studies Plan (NESP) presents the ESA team`s overall program of investigations of environmental conditions and activities related to potential impacts of studies by the US Department of Energy (DOE) in its program for developing Yucca Mt., Nevada, as the national high level nuclear waste (HLW) repository. The environmental studies specifically entail investigations of terrestrial ecology, soils and geomorphology, hydrology and water quality, archaeology and cultural resources, meteorology and air quality, noise, visual resources and reclamation planning. The NESP is a program of nine primary projects, described in this Plan. The nine projects of the program are distributed over three years. NESP`88-`89 is the first phase, covering the fiscal year (FY) July 1, 1988--June 30, 1989. The first phase is focused on program planning; preparation of various documents related to identifying impacts of past DOE activities and associated reclamation costs; review of DOE documents on environmental issues; and initiation of field investigations to establish the environmental issues; and initiation of field investigations to establish the environmental baseline conditions of the site. NESP`89-`90 is the second phase of the program, covering activities during FY`89-`90. The primary activities include continuing environmental baseline investigations; oversight of DOE activities including regulatory compliance assessments, field monitoring of DOE activities; development of disturbance, impact and reclamation models; and reclamation planning. NESP`90-`91 is the third phase of the program. The primary foci include continuing environmental monitoring of DOE activities and reclamation planning. Each of the phases is described in this Executive Summary. NESP`88-`89 is described in detail in the second part of the Study Plan. 86 refs., 20 tabs.

  7. 76 FR 44039 - Notice of Availability of the Draft Resource Management Plan Amendment, Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Development--The planning amendment addresses energy resource decision (i.e., oil and gas, coal, solar, wind... Wind Farm Project; Wyoming AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Availability... the Proposed Chokecherry and Sierra Madre (CCSM) Wind Farm Project and by this notice is (1)...

  8. A National Strategic Plan for Natural Resources and Environmental Management Education.

    ERIC Educational Resources Information Center

    Fridgen, Cynthia

    1995-01-01

    The Natural Resources and Environmental Management Program is designed to help people understand their relationship to the environment, practice stewardship, make informed decisions, and appreciate biodiversity. Areas of emphasis include air, land, and water quality; citizen responsibility; conflict management; approaches to land use and species…

  9. SNL/CA Cultural Resources Management Plan.

    SciTech Connect

    Larsen, Barbara L.

    2005-11-01

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  10. 78 FR 15041 - Notice of Availability of the Draft Miles City Resource Management Plan and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... be managed to enhance and protect cultural resources. Management actions proposed for this area are... analyze and update public land and resource management objectives within the planning area. The planning...-Grouse protection priority areas. The 21 areas proposed for designation and the resource use...

  11. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  12. 78 FR 69705 - Notice of Availability of the Draft Resource Management Plan Amendment and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... wetlands are developed. No new water rights would be created and no land ownership jurisdictions would...; water resources; cultural resources; recreation; science and education; livestock grazing..., enhance historical wetlands, and emphasize recreation related to warm water fisheries and...

  13. 75 FR 32963 - Notice of Availability of the Draft Resource Management Plan and Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    .... Alternative B: Same as Alternative A. Alternative C: ACEC would be rescinded. Closed to wind and solar energy... mineral material sales. Closed to wind and solar energy. Closed to motorized travel. Visual Resource... and Hilltop. Closed to wind and solar energy. Visual Resource Management Class I would apply to...

  14. 75 FR 30054 - Notice of Intent To Prepare an Environmental Impact Statement and Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... comments and identify issues. The RMP amendments will revise sage-grouse and sagebrush management direction.../en/programs/Planning/amendments/sage-grouse.html . In order to be included in the Draft RMP... any of the following methods: Web site:...

  15. 75 FR 8745 - Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Environmental Assessment for the Designation of the Lower Clear Creek and Grass Valley Creek Areas of Critical... western Shasta County) and Grass Valley Creek (in eastern Trinity County) as Areas of...

  16. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  17. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. Integrated mineral-resource and mineral-environmental assessments of public lands: Applications for land management and resource planning

    USGS Publications Warehouse

    Plumlee, Geoffrey S.; Smith, Steven M.; Toth, Margo I.; Marsh, Sherman P.; Ludington, S.D.; Wallace, A.R.; Ficklin, W.H.; Smith, K.S.; Nash, J.T.; Foley, N.K.; Van Loenen, R. E.; Berger, B.R.; Green, G.

    1993-01-01

    This report presents prototype mineralenvironmental assessments of the State of Colorado and the San Juan National Forest. The following pages will show examples of how geologic information can be used to help predict and prevent adverse environmental effects of mineralresource development.

  19. 77 FR 14414 - Notice of Intent To Revise Resource Management Plans and an Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... within the range of the northern spotted owl. The NWFP included a coordinated, comprehensive ecosystem... owl on June 28, 2011. The plan contains recommendations for retaining and restoring owl habitat in... the northern spotted owl and issuing a proposed rule in February 2012. The FWS completed a...

  20. 76 FR 72718 - Notice of Availability of the Draft Baker Resource Management Plan and Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... planning criteria for review and was published in the Federal Register on January 15, 2008 (73 FR 2520...: Livestock Grazing--How will livestock grazing on public lands be addressed? All four issues center on the.... The BLM Baker Field Office conducted an inventory of rivers and streams to determine eligibility...

  1. 76 FR 55941 - Notice of Availability of the Draft Bakersfield Resource Management Plan and Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... development and other land use authorizations with resource values; and (6) climate change. The Draft RMP... authorizations, livestock grazing, mineral development and recreation. Bitter Creek (6,121 acres): This newly... land use authorizations, mineral development and recreation. Other restrictions include closing...

  2. 76 FR 57759 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... opening of the comment period. DATES: To ensure that comments will be considered, the BLM must receive... Area, Kremmling Cretaceous Ammonite Research Natural Area, Kremmling Potential Conservation Area... the comment period. The KFO reviewed its wilderness resource inventory and ensured it was current...

  3. 77 FR 12076 - Final Programmatic Environmental Impact Statement and Integrated Water Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... of Reclamation (Reclamation), in cooperation with the Washington State Department of Ecology (Ecology... PEIS in the Federal Register on November 16, 2011 (76 FR 71070) with a public comment period ending on... In response to long-standing water resource problems in the basin, Reclamation and Ecology...

  4. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... nature and purposes of the five congressionally designated National Historic Trails within the Lander... effectively support the nature and purposes of the National Historic Trails, and the resources, qualities, values, and associated settings and the primary use or uses of each trail. Descriptions and maps of...

  5. 76 FR 60524 - Notice of Intent To Prepare a Resource Management Plan Amendment and Associated Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Land Management published a Notice of Intent in the Federal Register on June 24, 2011 (76 FR 37145... land description published on June 24, 2011 (76 FR 37145) by adding the following information: On page... Environmental Assessment Addressing Four Federal Coal Lease Applications in Haskell and LeFlore Counties,...

  6. 78 FR 29153 - Notice of Availability of the Draft Resource Management Plan and Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... Impact Statement for the Dominguez-Escalante National Conservation Area in Colorado AGENCY: Bureau of... Environmental Impact Statement (EIS) for the Dominguez-Escalante National Conservation Area (D-E NCA) and by... well as the Dominguez Canyon Wilderness (Wilderness), through the Omnibus Public Lands Management...

  7. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  8. Environmental Education Resource Catalog.

    ERIC Educational Resources Information Center

    Phoenix Union High School District, AZ.

    Prepared for the use of elementary and secondary school teachers, this catalog is designed to provide information about environmental education materials which will aid in classroom presentations and in curriculum development. Subject areas cover conservation and natural resources, ecology and ecosystems, environmental action and survival,…

  9. Environmental monitoring plan

    SciTech Connect

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  10. Environmental Monitoring Plan

    SciTech Connect

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  11. Evaluating the Relevance, Reliability, and Applicability of CMIP5 Climate Projections for Water Resources and Environmental Planning

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Scott, J.; Ferguson, I. M.; Arnold, J.; Raff, D. A.; Webb, R. S.

    2012-12-01

    Water managers need to understand the applicability of climate projection information available for decision-support at the scale of their applications. Applicability depends on information reliability and relevance. This need to understand applicability stems from expectations that entities rationalize adaptation investments or decisions to delay investment. It is also occurring at a time when new global climate projections are being released through the World Climate Research Programme Coupled Model Intercomparison Project phase 5 (CMIP5), which introduces new information opportunities and interpretation challenges. This project involves an interagency collaboration to evaluate the applicability of CMIP5 projections for use in water and environmental resources planning. The overarching goal is to develop and demonstrate a framework that involves dual evaluations of relevance and reliability informing an ultimate discussion and judgment of applicability, which is expected to vary with decision-making context. The framework is being developed and demonstrated within the context of reservoir systems management in California's Sacramento and San Joaquin River basins. The relevance evaluation focuses on identifying the climate variables and statistical measures relevant to long-term management questions, which may depend on satisfying multiple objectives. Past studies' results are being considered in this evaluation, along with new results from system sensitivity analyses conducted through this effort. The reliability evaluation focuses on the CMIP5 climate models' ability to simulate past conditions relative to observed references. The evaluation is being conducted across the global domain using a large menu of climate variables and statistical measures, leveraging lessons learned from similar evaluations of CMIP3 climate models. The global focus addresses a broader project goal of producing a web resource that can serve reliability information to applicability

  12. Environmental Education Strategic Plan

    SciTech Connect

    1991-12-01

    This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

  13. Resource Planning Guide

    SciTech Connect

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level is designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.

  14. Resource Planning Guide

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level ismore » designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.« less

  15. 76 FR 53484 - Notice of Availability of the Draft Resource Management Plan/Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    ... Environmental Impact Statement (EIS) for the Lower Sonoran (LS) and Sonoran Desert National Monument (SDNM.... ADDRESSES: You may submit written comments related to the LS-SDNM Draft RMP/EIS by any of the following methods: E-mail: blm_az_ls_sdnm_plan@blm.gov . Fax: 623-580-5580. Mail or in person: BLM Phoenix...

  16. Environmental Education for Teachers and Resource People.

    ERIC Educational Resources Information Center

    Forest Service (USDA), Washington, DC.

    This document is a guide for teachers and community resource personnel interested in developing an environmental education program. The book is divided into seven parts: (1) Process and Problem Solving Approach to Learning; (2) Lesson Plans for Environmental Investigations; (3) Simulations; (4) Developing Environmental Investigations; (5) Group…

  17. Environmental Monitoring Plan

    SciTech Connect

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  18. Environmental Education Compendium for Water Resources.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    Interdisciplinary by nature, environmental education is appropriate in any subject area and many educators often integrate environmental concepts into their lesson plans. This compendium of 109 collections of curriculum materials has been developed to assist educators in their selection of materials focusing on water resources. Curricula cover…

  19. Resource Conservation and Recovery Act Industrial Site Environmental Restoration Site Characterization Plan, Area 6 Decontamination Pond Facility, Revision 1

    SciTech Connect

    1996-08-12

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility (DPF) at the Nevada Test Site (NTS) which will be conducted for the U.S. Department of Energy, Nevada Operations OffIce (DOE/NV), Environmental Restoration Division (ERD). The objectives of the planned activities are to: o Obtain sufficient, ample analytical data from which further assessment, remediation, and/or closure strategies maybe developed for the site. o Obtain sufficient, sample analytical data for management of investigation-derived waste. All references to regulations contained in this plan are to the versions of the regulations that are current at the time of publication of this plan. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and Mound the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site . . characterization and waste management purposes.

  20. Planning Resource Aid, 1989.

    ERIC Educational Resources Information Center

    Broadbent, William A.

    Designed to assist persons charged with the preparation of planning proposals that meet the requirements of the program of federal assistance to vocational education, this booklet reviews several types of planning strategies. After introductory comments, the booklet lists several steps that all planners should incorporate into their strategy: (1)…

  1. Resource Conservation and Recovery Act industrial site environmental restoration, site characterization plan: Area 6 Decontamination Pond Facility. Revision 1

    SciTech Connect

    1996-08-01

    This plan presents the strategy for the characterization of the Area 6 Decontamination Pond Facility at the Nevada Test Site which will be conducted for the US Department of Energy, Nevada Operations Office, Environmental Restoration Division. The objectives of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste. The scope of the characterization may include surface radiation survey(s), surface soil sampling, subsurface soil boring (i.e., drilling), and sampling of soil in and around the pond; in situ sampling of the soil within subsurface soil borings; and sample analysis for both site characterization and waste management purposes.

  2. Resource Conservation and Recovery Act industrial site environmental restoration site characterization plan. Area 6 Steam Cleaning Effluent Ponds

    SciTech Connect

    1996-02-01

    This plan presents the strategy for the characterization of the Area 6 South and North Steam Cleaning Effluent Ponds (SCEPs) at the Nevada Test Site (NTS) to be conducted for the US Department of Energy, Nevada Operations Office (DOE/NV), Environmental Restoration Division (ERD). The purposes of the planned activities are to: obtain sufficient, sample analytical data from which further assessment, remediation, and/or closure strategies may be developed for the site; obtain sufficient, sample analytical data for management of investigation-derived waste (IDW). The scope of the characterization may include excavation, drilling, and sampling of soil in and around both ponds; sampling of the excavated material; in situ sampling of the soil at the bottom and on the sides of the excavations as well as within subsurface borings; and conducting sample analysis for both characterization and waste management purposes. Contaminants of concern include RCRA-regulated VOCs and metals.

  3. Resource Use Planning.

    ERIC Educational Resources Information Center

    Clawson, Marion

    Although there is valid concern with the limited supply of natural resources and how this supply is affected by increasing population and a life style based on consumption, a more important concern is with the future quality of those natural resources. The focus in the past has been on the production of goods for sale, very little on the welfare…

  4. Linking Resource Decisions to Planning

    ERIC Educational Resources Information Center

    Saunders, Laura

    2014-01-01

    This chapter explores the relationship between strategic planning and budgeting. It describes how community college leaders can use strategic and foundational plans (academic, facilities, technology, and financial) to drive budgets and resource allocations in support of institutional goals and objectives. Finally, it identifies challenges of doing…

  5. Comprehensive energy resources plan

    NASA Astrophysics Data System (ADS)

    Historical trends, current status, and projections of sources and uses of energy in Maine are presented. An overview of conservation opportunities and current programs in four broad categories; residential, commercial/institutional, industrial, and transportation is provided. Cogeneration and district heating are discussed. The potentials and limits for the development of each of Maine's major renewable energy resources and some of the current government programs relating to them are discussed. Some of the most significant factors and issues regarding use of nonrenewable energy resources in Maine are described. The potential for energy exchange with Canada is briefly discussed.

  6. Integrated Resource Planning Model (IRPM)

    SciTech Connect

    Graham, T. B.

    2010-04-01

    The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

  7. Environmental Monitoring Plan

    SciTech Connect

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001). Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements

  8. North Carolina Community College System Information Resources and Technology Plan.

    ERIC Educational Resources Information Center

    North Carolina Community Coll. System, Raleigh.

    The North Carolina Community College System engaged in a strategic planning process in 1998 that was the basis for the information resources and technology plans for the entire System. A focus of the planning was technology, and a technology environmental scanning team developed a set of planning assumptions, which led to the creation of 15 goals…

  9. Environmental Resource Compendium: Operation Earth.

    ERIC Educational Resources Information Center

    Public Broadcasting Service, Washington, DC.

    The "Year of the Environment" outreach campaign--OPERATION EARTH--is designed to encourage local and individual involvement in environmental activities and to enable public television stations, along with educators and local environmental groups, to develop local outreach plans which meet the environmental needs of the community they serve. This…

  10. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  11. Idaho National Laboratory Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  12. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  13. Enterprise resource planning for hospitals.

    PubMed

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes. PMID:15171978

  14. 78 FR 21965 - Notice of Availability of the Draft Tri-County Resource Management Plan and Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... (plant and animal) resource values. Proposed resource-use limitations include: Exclusion from new rights... rights-of-way; closure to fluid mineral leasing and mineral material sales; using chemical brush control... resource-use limitations include: Exclusion or avoidance of new rights-of-way; closure to fluid...

  15. Project resources planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1984-01-01

    This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

  16. 75 FR 55602 - Notice of Intent To Prepare an Environmental Assessment To Amend the Resource Management Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act (FLPMA) of 1976, as amended, the Bureau of Land Management (BLM) San Luis Valley Public Lands Center, Monte Vista, Colorado, intends to prepare an Environmental Assessment (EA) and by this notice is announcing the beginning of the scoping process to solicit public......

  17. Idaho National Laboratory Site Environmental Monitoring Plan

    SciTech Connect

    Jenifer Nordstrom

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  18. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Selection of resource management plan..., BUDGETING Resource Management Planning § 1610.4-8 Selection of resource management plan. After publication of the draft resource management plan and draft environmental impact statement, the Field...

  19. 43 CFR 1610.4-8 - Selection of resource management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Selection of resource management plan..., BUDGETING Resource Management Planning § 1610.4-8 Selection of resource management plan. After publication of the draft resource management plan and draft environmental impact statement, the Field...

  20. A Guide for Environmental Health Planning

    ERIC Educational Resources Information Center

    Crawford, Gene M.

    1972-01-01

    Outlines objectives and resources to be assessed in a community environmental health plan. Considers: water; liquid waste disposal; housing maintenance; solid waste disposal; air pollution; food and food protection; rodent control; insect control; migrant labor camps; recreation sites; mobile homes - trailer parks; schools, institutions - public…

  1. 78 FR 39311 - Notice of Intent To Prepare a Resource Management Plan Amendment and an Associated Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... of approximately 45 acres at the top of Glass Buttes from a VRM class 2 to a VRM class 4. The BLM... atop Glass Buttes in the BLM Prineville District. This notice announces the beginning of the scoping... may submit comments on issues and planning criteria related to the Glass Buttes Communication Site...

  2. 77 FR 64349 - Notice of Availability of the Draft West Eugene Wetlands Resource Management Plan/Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... process was initiated on June 8, 2011, through a Notice of Intent published in the Federal Register (76 FR... Bureau of Land Management Notice of Availability of the Draft West Eugene Wetlands Resource Management...) for the West Eugene Wetlands and by this notice is announcing the opening of the comment period....

  3. Bow-corridor local integrated resource plan: Draft plan

    SciTech Connect

    Not Available

    1990-01-01

    This plan presents the Government of Alberta's resource management policy for public lands and resources within the Bow Corridor. Resource potentials and opportunities for development are identified to assist in the economic progress of the province. The plan includes identification of its purpose and scope and the context in which it is presented; and resource management objectives and guidelines for ecological and aesthetic resources, fisheries, forests, historical resources, minerals, range land, settlement, tourism/recreation, water and watersheds and wildlife.

  4. Metropolitan Environmental Education Resources Study.

    ERIC Educational Resources Information Center

    Freund, John Dean, Ed.

    Two major objectives of the Metropolitan Environmental Education Resources Study were: (1) to produce a directory of sites around Columbus, Ohio, having fieldtrip potential; and (2) to test the validity of the concept that field trips are a useful method in aiding student educational growth. The first section of this document relates the history…

  5. CEBAF - environmental protection program plan

    SciTech Connect

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  6. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  7. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  8. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  9. 2002 WIPP Environmental Monitoring Plan

    SciTech Connect

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  10. Strategic Human Resource Planning in Academia

    ERIC Educational Resources Information Center

    Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan

    2009-01-01

    A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…

  11. Primer on gas integrated resource planning

    SciTech Connect

    Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S.

    1993-12-01

    This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

  12. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  13. Resource assessment/commercialization planning meeting

    SciTech Connect

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  14. The Nature of Effective Human Resource Planning.

    ERIC Educational Resources Information Center

    Don, Daniel; Kleiner, Brian H.

    1991-01-01

    The general structure of the human resource planning function in organizations and the responsibilities at each level of management are discussed. A framework for constructing and implementing a human resource planning system is outlined, and several approaches for human resource forecasting are examined. (MSE)

  15. Environmental Monitoring Plan, Revision 6

    SciTech Connect

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  16. Environmental projects. Volume 7: Environmental resources document

    NASA Technical Reports Server (NTRS)

    Kushner, Len; Kroll, Glenn

    1988-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) in Barstow, California, is part of the NASA Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Goldstone is managed, directed and operated by the Jet Propulsion Laboratory of Pasadena, California. The GDSCC includes five distinct operational sites: Echo, Venus, Mars, Apollo, and Mojave Base. Within each site is a Deep Space Station (DPS), consisting of a large dish antenna and its support facilities. As required by NASA directives concerning the implementation of the National Environmental Policy Act, each NASA field installation is to publish an Environmental Resources Document describing the current environment at the installation, including any adverse effects that NASA operations may have on the local environment.

  17. Risk Analysis for Resource Planning Optimization

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming

    2008-01-01

    This paper describes a systems engineering approach to resource planning by integrating mathematical modeling and constrained optimization, empirical simulation, and theoretical analysis techniques to generate an optimal task plan in the presence of uncertainties.

  18. Career Planning: Developing the Nation's Primary Resource.

    ERIC Educational Resources Information Center

    Jarvis, Phillip S.

    1995-01-01

    Argues for intensive and ongoing career planning assistance for all age groups to ensure the development of people resources to meet Canada's economic needs. Points out the economic consequences of inadequate planning. (LKS)

  19. Environmental Resources of Selected Areas of Hawaii: Ecological Resources (DRAFT)

    SciTech Connect

    Trettin, C.C.; Tolbert, V.R.; Jones, A.T.; Smith, C.R.; Kalmijn, A.J.

    1994-06-01

    This report has been prepared to make available and archive the background scientific data and related information collected on ecological resources during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (COE) published a notice in the Federal Register on May 17, 1994 (Fed. Regist. 5925638) withdrawing its Notice of Intent (Fed. Regst. 575433) of February 14, 1992, to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. The background scientific data and related information presented in this report focus on several areas of Hawaii County, including the southeastern coast, a potential development corridor along the Saddle Road between Hilo and the North Kohala District on the northwestern coast, and on the southeastern coast of Maui. In this report, reference is made to these areas as study areas rather than as areas where proposed or alternative facilities of the HGP would be located. The resource areas addressed herein include terrestrial ecology, aquatic ecology, and marine ecology. The scientific background data and related information is being made available for future research in these areas. This report describes the environmental resources present in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts.

  20. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  1. Environmental Monitoring Plan, Revision 5

    SciTech Connect

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  2. Fifth national conference on integrated resource planning

    SciTech Connect

    Not Available

    1994-01-01

    Presentations at the Fifth National Conference on Integrated Resource Planning, sponsored by the National Association of Regulatory Utility Commissioners, are presented in this volume. Topics cover gas and electric utilities, demand side management programs, assessment of the value of externalities, integrated resource planning implementation, economic analyses, regulatory problems with IRP, etc.

  3. Linking Career Development and Human Resource Planning.

    ERIC Educational Resources Information Center

    Gutteridge, Thomas G.

    When organizations integrate their career development and human resources planning activities into a comprehensive whole, it is the exception rather than the rule. One reason for the frequent dichotomy between career development and human resource planning is the failure to recognize that they are complements rather than synonyms or substitutes.…

  4. Corrective Action Planning for Environmental Compliance Deficiencies

    SciTech Connect

    Sigmon, C. F.; Ashburn, S. A.; Jolley, R. L.; Smith, A. A.; Mercer, A. E.; Oeulette, B.; Renz, K.; Scott, S.

    1995-01-01

    Effective corrective action planning is one of the cornerstones of an effective environmental management program. Alternatively, ineffective planning can highlight an installation`s unwillingness or inability to effectively address environmental compliance deficiencies. The following paper discusses several guidelines to consider in corrective action planning to ensure that plans benefit rather than harm an installation`s overall environmental management program.

  5. Planning and Scheduling for Environmental Sensor Networks

    NASA Astrophysics Data System (ADS)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  6. Planning environmental sanitation programmes in emergencies.

    PubMed

    Harvey, Peter A; Reed, Robert A

    2005-06-01

    Environmental sanitation programmes are vital for tackling environmental-related disease and ensuring human dignity in emergency situations. If they are to have maximum impact they must be planned in a rapid but systematic manner. An appropriate planning process comprises five key stages: rapid assessment and priority setting; outline programme design; immediate action; detailed programme design; and implementation. The assessment should be based on carefully selected data, which are analysed via comparison with suitable minimum objectives. How the intervention should be prioritised is determined through objective ranking of different environmental sanitation sector needs. Next, a programme design outline is produced to identify immediate and longer-term intervention activities and to guarantee that apposite resources are made available. Immediate action is taken to meet acute emergency needs while the detailed programme design takes shape. This entails in-depth consultation with the affected community and comprehensive planning of activities and resource requirements. Implementation can then begin, which should involve pertinent management and monitoring strategies. PMID:15910646

  7. Integrating Workforce Planning, Human Resources, and Service Planning.

    ERIC Educational Resources Information Center

    O'Brien-Pallas, Linda; Birch, Stephen; Baumann, Andrea; Murphy, Gail Tomblin

    The feasibility of integrated health human resources planning (IHHRP) was examined. The analysis focused on the following topics: ways of integrating labor market indicators into service planning; whether planning is sufficiently responsive and flexible to retain relevance and validity in rapidly changing health systems; different models and…

  8. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  9. Environmental planning and decision making

    SciTech Connect

    Ortolano, L.

    1984-01-01

    Environmental planning is a multidisciplinary field encompassing biology, engineering, geography, the earth sciences, and landscape architecture among other subjects. This book was written in textbook format to provide an introduction to the field. It is suitable for students at all levels, professionals, and general readers interested in the quality of the environment. It includes a list of key concepts and terms for each chapter, references for further study, discussion questions, and a subject index. Contents: Residuals management. Environmental impact assessment. Land use and the environment. Index.

  10. 77 FR 13141 - Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource Management Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... Bureau of Land Management Notice of Intent To Prepare a Master Leasing Plan, Amendments to the Resource..., intend to prepare a Master Leasing Plan (MLP), amendments to the 2008 Moab and Monticello Resource Management Plans (RMPs), and a single environmental impact statement (EIS) to consider leasing for oil...

  11. 75 FR 26270 - Environmental Planning and Historic Preservation Compliance Costs Policy; Environmental Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... FEMA's environmental planning and historic preservation (EHP) review, EHP analysis preparation, and execution of EHP mitigation measures. The draft Environmental Planning and Historic Preservation...

  12. Environmental health discipline science plan

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The purpose of this plan is to provide a conceptual strategy for NASA's Life Sciences Division research and development activities in environmental health. It covers the significant research areas critical to NASA's programmatic requirements for the Extended Duration Orbiter, Space Station Freedom, and exploration mission science activities. These science activities include ground-based and flight; basic, applied, and operational; animal and human subjects; and research and development. This document summarizes the history and current status of the program elements, outlines available knowledge, establishes goals and objectives, identifies scientific priorities, and defines critical questions in the three disciplines: (1) Barophysiology, (2) Toxicology, and (3) Microbiology. This document contains a general plan that will be used by both NASA Headquarters Program Officers and the field centers to review and plan basic, applied, and operational research and development activities, both intramural and extramural, in this area. The document is divided into sections addressing these three disciplines.

  13. Human Resource Planning for Equity and Efficiency.

    ERIC Educational Resources Information Center

    Martin, Ann M.

    1982-01-01

    The author discusses the factors which must be considered for effective human resource planning. These factors include a grasp of regional reindustrialization, social and demographic changes, and social and economic priorities.

  14. Environmental Restoration Quality Program Plan

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  15. 78 FR 29132 - Environmental Management Resources, Inc.; Transfer of Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... AGENCY Environmental Management Resources, Inc.; Transfer of Data AGENCY: Environmental Protection Agency... Management Resources, Inc. Environmental Management Resources, Inc. has been awarded a contract to perform work for OPP, and access to this information will enable Environmental Management Resources, Inc....

  16. RFF reader in environmental and resource management

    SciTech Connect

    Oates, W.E.

    1998-12-31

    For decades RFF`s [Resources For the Future] quarterly publication Resources has provided concise original essays that address environmental and resource issues. Teachers and students, journalists, policy analysts, and government officials look to Resources for readable, impartial, and often semiannual treatments of troublesome questions. Esteemed environmental economist and RFF University Fellow Wallace Oats has compiled much of RFF`s best work in this new volume. The book combines material from the oft-cited pages of Resources with other important RFF writings in critical areas such as pollution control and climate change. The book`s design is patterned on the college syllabus, making it ideally suited for course use in environmental studies and policy, natural resources, environmental studies and policy, environmental and resource economics, and public policy.

  17. NATIONAL METAL FINISHING ENVIRONMENTAL R&D PLAN - AN UPDATE

    EPA Science Inventory

    This document is an update to the National Metal Finishing Environmental R&D Plan (EPA/600/R-97/095), dated September 1997. The 1997 Plan and Update are available on the National Metal Finishing Resource Center's web site, www.nmfrc.org. The primary purpose in preparing an up...

  18. Career Planning: Developing the Nation's Primary Resource.

    ERIC Educational Resources Information Center

    Jarvis, Phillip S.

    Career planning is the most critical ingredient in developing a nation's primary resource, its workers. A 1988 Gallup Poll showed that 62 percent of U.S. workers had no career goal when they began their first job, and more than 50 percent felt they were in the wrong job. The same results probably could be applied to Canada. Career planning skills…

  19. Human Resource Planning: An Introduction. Report 312.

    ERIC Educational Resources Information Center

    Reilly, Peter

    This report is designed to give readers an introduction to the principles of human resource planning (HRP) and the areas in which it can be used, including those facing today's managers. Chapter 1 outlines why some organizations no longer plan, describes the background of change and uncertainty that discouraged them, and defines HRP. Chapter 2…

  20. Just Do It: Resources for Interpretive Planning

    ERIC Educational Resources Information Center

    Koepler, Jes

    2008-01-01

    Now that you have finished reading this journal issue and understand what interpretive planning is and when to apply it, how can you get started and just "do" it? This article provides an annotated list of practical handbooks and internet resources that provide guidelines for museum practitioners to engage in interpretive planning at institutions…

  1. Environmental information for military planning.

    PubMed

    Doherty, Victoria; Croft, Darryl; Knight, Ashley

    2013-07-01

    A study was conducted to consider the implications of presenting Environmental Information (EI; information on current environmental features including weather, topography and visibility maps) for military planning to the growing audience of non-technical users; to provide guidance for ensuring usability and for development of a suitable EI interface, and to produce an EI concept interface mock-up to demonstrate initial design ideas. Knowledge was elicited from current EI users and providers regarding anticipated use of EI by non-specialists. This was combined with human factors and cognition expertise to produce guidance for data usability and development of an EI interface. A simple mock-up of an EI concept interface was developed. Recommendations for further development were made including application of the guidance derived, identification of a user test-bed and development of business processes. PMID:23290260

  2. Hanford cultural resources management plan

    SciTech Connect

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  3. Environmentally Sound Small-Scale Energy Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Bassan, Elizabeth Ann; Wood, Timothy S., Ed.

    This manual is the fourth volume in a series of publications that provide information for the planning of environmentally sound small-scale projects. Programs that aim to protect the renewable natural resources that supply most of the energy used in developing nations are suggested. Considerations are made for physical environmental factors as…

  4. National conference on integrated resource planning: Proceedings

    SciTech Connect

    Not Available

    1991-01-01

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  5. National conference on integrated resource planning: Proceedings

    SciTech Connect

    Not Available

    1991-12-31

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  6. PST and PARR: Plan specification tools and a planning and resource reasoning shell for use in satellite mission planning

    NASA Technical Reports Server (NTRS)

    Mclean, David; Yen, Wen

    1989-01-01

    Plan Specification Tools (PST) are tools that allow the user to specify satellite mission plans in terms of satellite activities, relevent orbital events, and targets for observation. The output of these tools is a set of knowledge bases and environmental events which can then be used by a Planning And Resource Reasoning (PARR) shell to build a schedule. PARR is a reactive planning shell which is capable of reasoning about actions in the satellite mission planning domain. Each of the PST tools and PARR are described as well as the use of PARR for scheduling computer usage in the multisatellite operations control center at Goddard Space Flight Center.

  7. 75 FR 10811 - Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell Resource...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-09

    ... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan Amendment to the Roswell... prepare an amendment to the Roswell Resource Management Plan (RMP) with an associated Environmental... BLM Web site at: http://www.blm.gov/nm/st/en.html . In order to be included in the Draft RMP...

  8. Environmental resources of selected areas of Hawaii: Ecological resources

    SciTech Connect

    Trettin, C.C.; Tolbert, V.R.; Jones, A.T.; Smith, C.R.; Kalmijn, A.J.

    1995-03-01

    This report has been prepared to make available and archive the background scientific data and related information collected on ecological resources during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. The background scientific data and related information presented in this report focus on several areas of Hawaii County. In this report, reference is made to these areas as study areas rather than as areas where proposed or alternative facilities of the HGP would be located. The resource areas addressed herein include terrestrial ecology, aquatic ecology, and marine ecology. The scientific background data and related information that were obtained from review of the (1) scientific literature, (2) government and private sector reports, (3) studies done under DOE interagency agreements with the US Fish and Wildlife Service (FWS) and with the US Army Corps of Engineers (COE), and (4) observations made during site visits are being made available for future research in these areas.

  9. Applied social science for environmental planning

    SciTech Connect

    Millsap, W.

    1983-01-01

    As regions and communities are increasingly affected by the projects, programs, and policies of disparate government and private groups, the skills of social scientists are being called on to aid in the environmental planning process. This volume presents accounts of the many ways in which the social sciences are contributing to environmental planning. The authors address the transition from theory to practice in environmental planning, local-level contributions to the planning process, socioeconomic development and planning needs, and socioenvironmental planning and mitigation procedures.

  10. MCLA-Berkshire Environmental Resource Center (BERC)

    SciTech Connect

    Monica Joslin

    2010-09-15

    The Berkshire Environmental Resource Center at the Massachusetts College of Liberal Arts was established in 2005 to advance student and faculty research, promote environmental awareness and preservation throughout the community, and serve as a resource center for students, faculty, and community members. The project proposed is to enhance programming and outreach.

  11. Resource envelope concepts for mission planning

    NASA Technical Reports Server (NTRS)

    Ibrahim, K. Y.; Weiler, J. D.; Tokaz, J. C.

    1991-01-01

    Seven proposed methods for creating resource envelopes for Space Station Freedom mission planning are detailed. Four reference science activity models are used to illustrate the effect of adding operational flexibility to mission timelines. For each method, a brief explanation is given along with graphs to illustrate the application of the envelopes to the power and crew resources. The benefits and costs of each method are analyzed in terms of resource utilization. In addition to the effect on individual activities, resource envelopes are analyzed at the experiment level.

  12. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  13. Environmental Planning and Ecology Program Annual Report.

    SciTech Connect

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  14. Planning with Continuous Resources in Stochastic Domains

    NASA Technical Reports Server (NTRS)

    Mausam, Mausau; Benazera, Emmanuel; Brafman, Roneu; Hansen, Eric

    2005-01-01

    We consider the problem of optimal planning in stochastic domains with metric resource constraints. Our goal is to generate a policy whose expected sum of rewards is maximized for a given initial state. We consider a general formulation motivated by our application domain--planetary exploration--in which the choice of an action at each step may depend on the current resource levels. We adapt the forward search algorithm AO* to handle our continuous state space efficiently.

  15. Environmental monitoring plan - environmental monitoring section. Revision 1

    SciTech Connect

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  16. 76 FR 33341 - Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... costs of management. Preliminary planning criteria include: 1. Lands addressed in the RMP will be public... Bureau of Land Management Notice of Intent to prepare a Resource Management Plan for the West Eugene Wetlands Planning Area in the State of Oregon and Associated Environmental Impact Statement AGENCY:...

  17. 76 FR 16250 - Planning Resource Adequacy Assessment Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Energy Regulatory Commission 18 CFR Part 40 Planning Resource Adequacy Assessment Reliability Standard... Standard, BAL-502-RFC-02 (Planning Resource Adequacy Analysis, Assessment and ] Documentation), developed... Reliability Corporation. The approved regional Reliability Standard requires planning coordinators within...

  18. C++ Planning and Resource Reasoning (PARR) shell

    NASA Technical Reports Server (NTRS)

    Mcintyre, James; Tuchman, Alan; Mclean, David; Littlefield, Ronald

    1994-01-01

    This paper describes a generic, C++ version of the Planning and Resource Reasoning (PARR) shell which has been developed to supersede the C-based versions of PARR that are currently used to support AI planning and scheduling applications in flight operations centers at Goddard Space Flight Center. This new object-oriented version of PARR can be more easily customized to build a variety of planning and scheduling applications, and C++ PARR applications can be more easily ported to different environments. Genetic classes, constraints, strategies, and paradigms are described along with two types of PARR interfaces.

  19. Teachers Environmental Resource Unit: Consumer Resources Idea Manual.

    ERIC Educational Resources Information Center

    Bemiss, Clair W.

    The Consumer Resources Environteam has developed this idea handbook as part of the Broad Spectrum Environmental Education Program in Brevard County, Florida. Interest had been displayed by local civic groups, fraternal clubs, and private organizations in identifying environmental improvement projects that could be undertaken by individual groups.…

  20. Distributional conflicts in environmental-resource policy

    SciTech Connect

    Schnaiberg, A.; Watts, N.; Zimmerman, K.

    1986-01-01

    Why is an allocation-oriented policy like environmental and resources policy relatively unsuccessful. How could this problem be overcome-by means of what institutional reform or policy initiatives. These two questions are addressed in this book. CONTENTS: Preface Introduction: From Consensus to Dissensus; Efficiency and Distribution in Corrective Mechanisms for Environmental Externality; Equity and Efficiency in Environmental Policy Analysis; The Welfare State, the New Regulation and the Rule of Law; How and Why Environmental Consciousness Has Trickled Down; Capitol and Labor Reallocation in the Face of Environmental Policy; Contradictions and Changes in Labor Response to Distributional Implications of Environmental-Resource Policies; State Roles in the Articulation and Mediation of Distributional Conflicts; Solidarity Between Generations; Future Projectories of Resource Distributional Conflicts.

  1. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  2. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  3. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  4. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  5. Resource Allocation Planning Helper (RALPH): Lessons learned

    NASA Technical Reports Server (NTRS)

    Durham, Ralph; Reilly, Norman B.; Springer, Joe B.

    1990-01-01

    The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

  6. 76 FR 52687 - Notice of Intent To Prepare a Resource Management Plan (RMP) Amendment and Associated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan (RMP) Amendment and... prepare a Resource Management Plan (RMP) amendment with an associated Environmental Assessment (EA) for... the RMP ] amendment with an associated EA. Comments on issues may be submitted in writing...

  7. 75 FR 57056 - Notice of Availability of the Draft Buffalo Resource Management Plan Amendment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... Bureau of Land Management Notice of Availability of the Draft Buffalo Resource Management Plan Amendment... Bureau of Land Management (BLM) has prepared a Draft Resource Management Plan Amendment and Environmental..._Crk_WYMail@blm.gov . Fax: (307) 684-1122. Mail: Buffalo RMP Amendment/Fortification Creek EA,...

  8. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  9. Resource allocation planning with international components

    NASA Technical Reports Server (NTRS)

    Burke, Gene; Durham, Ralph; Leppla, Frank; Porter, David

    1993-01-01

    Dumas, Briggs, Reid and Smith (1989) describe the need for identifying mutually acceptable methodologies for developing standard agreements for the exchange of tracking time or facility use among international components. One possible starting point is the current process used at the Jet Propulsion Laboratory (JPL) in planning the use of tracking resources. While there is a significant promise of better resource utilization by international cooperative agreements, there is a serious challenge to provide convenient user participation given the separate project and network locations. Coordination among users and facility providers will require a more decentralized communication process and a wider variety of automated planning tools to help users find potential exchanges. This paper provides a framework in which international cooperation in the utilization of ground based space communication systems can be facilitated.

  10. Research and Development Program Plan for Geopressure-Geothermal Resources

    SciTech Connect

    1980-12-01

    The objective of the Geopressure-Geothermal Program of the Division of Geothermal Energy, U.S. Department of Energy, is to determine by the end of FY86 the magnitude and economic potential of the geopressure-geothermal resources. This Program Plan describes how the Department of Energy proposes to achieve this objective. The main purposes of the current program are to narrow the range of uncertainty on the potential recovery of energy from the geopressure-geothermal resources and to ensure the timely development of these resources as the potential is demonstrated. For these purposes, the Division of Geothermal Energy has established the following objectives: (1) Define the magnitude, potential, and economics of the resources. (2) Conduct supporting research on reservoir and fluid characteristics. (3) Adapt or develop downhole, surface, and disposal technology. (4) Identify and mitigate adverse environmental, legal, and institutional issues in order to promote commercialization.

  11. Resource Contingency Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  12. Legal foundations of environmental planning

    SciTech Connect

    Rose, J.G.

    1983-01-01

    This casebook provides an introduction to the rapidly evolving field of environmental law. In the first section of this work, the author examines the procedure and remedies, as well as the substantive law, of environmental litigation. The two following sections explore statutory and common law approaches to the problems of air and water pollution. The final section of the volume departs from the traditional stuff of environmental practice by examining the problems of litigation in the field of population growth and distribution.

  13. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

    2004-02-19

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  14. Three Approaches to Environmental Resources Analysis.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Graduate School of Design.

    This booklet, the first of a projected series related to the development of methodologies and techniques for environments planning and design, examines three approaches that are currently being used to identify, analyze, and evaluate the natural and man-made resources that comprise the physical environment. One approach by G. Angus Hills uses a…

  15. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  16. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for...

  17. 43 CFR 1610.1 - Resource management planning guidance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provided in 40 CFR 1502.6. The disciplines of the preparers shall be appropriate to the values involved and... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning guidance... Resource Management Planning § 1610.1 Resource management planning guidance. (a) Guidance for...

  18. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  19. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF... Resource Management Planning § 1610.4 Resource management planning process....

  20. Environmental Health Planning Guide. Revised 1968.

    ERIC Educational Resources Information Center

    Public Health Service (DHEW), Rockville, MD.

    This guide to environmental health planning outlines the process and procedures of bringing together certain fundamental data pertaining to various physical aspects of the environment, including data collection, evaluation, usage, and implementation. The components of such planning programs are listed along with study preparation information.…

  1. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false General environmental resources information. 783.12 Section 783.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... INFORMATION ON ENVIRONMENTAL RESOURCES § 783.12 General environmental resources information. Each...

  2. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false General environmental resources information. 779.12 Section 779.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... ON ENVIRONMENTAL RESOURCES § 779.12 General environmental resources information. Each...

  3. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false General environmental resources information. 783.12 Section 783.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... INFORMATION ON ENVIRONMENTAL RESOURCES § 783.12 General environmental resources information. Each...

  4. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false General environmental resources information. 779.12 Section 779.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... ON ENVIRONMENTAL RESOURCES § 779.12 General environmental resources information. Each...

  5. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false General environmental resources information. 783.12 Section 783.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... INFORMATION ON ENVIRONMENTAL RESOURCES § 783.12 General environmental resources information. Each...

  6. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false General environmental resources information. 779.12 Section 779.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... ON ENVIRONMENTAL RESOURCES § 779.12 General environmental resources information. Each...

  7. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false General environmental resources information. 783.12 Section 783.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... INFORMATION ON ENVIRONMENTAL RESOURCES § 783.12 General environmental resources information. Each...

  8. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false General environmental resources information. 783.12 Section 783.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... INFORMATION ON ENVIRONMENTAL RESOURCES § 783.12 General environmental resources information. Each...

  9. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false General environmental resources information. 779.12 Section 779.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... ON ENVIRONMENTAL RESOURCES § 779.12 General environmental resources information. Each...

  10. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false General environmental resources information. 779.12 Section 779.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... ON ENVIRONMENTAL RESOURCES § 779.12 General environmental resources information. Each...

  11. PAIR (Planning and Analysis of Inspection Resources)

    SciTech Connect

    Teichmann, T.; Santaniello, A.; Fishbone, L.G.

    1994-03-01

    The safeguards inspection effort of the International Atomic Energy Agency consists of the efforts for the Physical Inventory Verifications to close the annual material balance, Interim Inventory Verifications, conducted mainly to satisfy the Timeliness Criteria, Flow Verifications to verify the transfer of material, and Containment and Surveillance activities, which help preserve continuity of knowledge concerning the material. Estimating the requiring overall future inspection effort under a variety of conditions is an important part of Agency planning. As exemplified by the sample results provides a straightforward means to analyze `What if` situations in safeguards implementation. It thereby permits managers and analysts to study future scenarios and their effect on human resources. It is planned to introduce into PAIR a direct capability for studying costs associated with these hypothetical changes in safeguards implementation. In this way PAIR could more easily assist the Safeguards Department in its current program of investigating new safeguards approaches.

  12. Resource management plan for the Oak Ridge Reservation. Volume 30, Oak Ridge National Environmental Research Park natural areas and reference areas--Oak Ridge Reservation environmentally sensitive sites containing special plants, animals, and communities

    SciTech Connect

    Pounds, L.R.; Parr, P.D.; Ryon, M.G.

    1993-08-01

    Areas on the Oak Ridge Reservation (ORR) that contain rare plant or animal species or are special habitats are protected through National Environmental Research Park Natural Area (NA) or Reference Area (RA) designations. The US Department of Energy`s Oak Ridge National Environmental Research Park program is responsible for identifying species of vascular plants that are endangered, threatened, or rare and, as much as possible, for conserving those areas in which such species grow. This report includes a listing of Research Park NAs and RAs with general habitat descriptions and a computer-generated map with the areas identified. These are the locations of rare plant or animal species or special habitats that are known at this time. As the Reservation continues to be surveyed, it is expected that additional sites will be designated as Research Park NAs or RAs. This document is a component of a larger effort to identify environmentally sensitive areas on ORR. This report identifies the currently known locations of rare plant species, rare animal species, and special biological communities. Floodplains, wetlands (except those in RAs or NAs), and cultural resources are not included in this report.

  13. Teachers Environmental Resource Unit: The Automobile.

    ERIC Educational Resources Information Center

    Bemiss, Clair W.

    Environmental problems created by the automobile and intensified rapidly over the past three decades are studied in this teacher's guide. The resource unit is intended to provide the teacher with basic information that will aid classroom review of these problems. With efficient and effective transportation as a goal, topics focus on transportation…

  14. Pinellas Plant environmental monitoring plan

    SciTech Connect

    Not Available

    1996-07-01

    The Pinellas Plant Environmental Monitoring Program is comprised of two major activities as follows: effluent monitoring and environmental surveillance. The collection and analysis of samples or measurements of liquid and gaseous effluents for the purpose of characterizing and quantifying contaminants, assessing radiation exposures to members of the public, providing a means to control effluents at or near the point of discharge, and demonstrating compliance with applicable standards and permit requirements. The collection and analysis of samples or direct measurements of air, water, soil, food stuff, biota, and other media from DOE sites and their environs for the purpose of determining compliance with applicable standards and permit requirements, assessing radiation exposure to members of the public, and assessing the effects, if any, on the local environment. Effluent monitoring and environmental surveillance at the Pinellas Plant include monitoring liquid and airborne effluents, groundwater, surface water, soil, and local weather conditions.

  15. Routine Radiological Environmental Monitoring Plan. Volume 1

    SciTech Connect

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  16. Environmental Resources of Selected Areas of Hawaii: Socioeconomics (DRAFT)

    SciTech Connect

    Saulsbury, J.W.; Sorensen, B.M.; Schexnayder, S.M.

    1994-06-01

    This report has been prepared to make available and archive the background information on socioeconomic resources collected during the preparation of the Environmental Impact Statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The U.S. Department of Energy (DOE) published a notice in the Federal Register on May 17, 1994 (Fed. Regis. 5925638), withdrawing its Notice of Intent (Fed Regis. 57:5433), of February 14, 1992, to prepare the HGPEIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This document provides background information on socioeconomic resources in Hawaii County, with particular emphasis on the Puna District (Fig. 1). Information is being made available for use by others in conducting future socioeconomic impact assessments in this area. This report describes existing socioeconomic resources in the areas studied (i.e., the affected environment) and does not represent an assessment of environmental impacts. The socioeconomic resources described are primarily those that would be affected by employment and population growth associated with any future large-scale development. These resource categories are (1) population, (2) housing, (3) land use, (4) economic structure (primarily employment and income), (5) infrastructure and public services (education, ground transportation, police and fire protection, water, wastewater, solid waste disposal, electricity, and emergency planning), (6) local government revenues and expenditures, and (7) tourism and recreation.

  17. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    None, None

    2008-03-12

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  18. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  19. ORNL long-range environmental and waste management plan

    SciTech Connect

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  20. Grand Junction Resource Area, Resource Management Plan, Grand Junction, Colorado

    SciTech Connect

    Not Available

    1985-03-01

    Implementation of a resource management plan is proposed for the 2.0-million-acre Grand Junction Planning Area, located in west-central Colorado. Under the preferred alternative, existing withdrawals from mineral location on 124,442 acres would continue and an additional 154,067 acres would be withdrawn. Approximately 14,100 acres would be identified as unsuitable for further coal leasing. Approximately 624,701 acres would be open to oil and gas leasing without stipulations; 685,603 acres would be open to oil and gas leasing with stipulations; and 149,087 acres would be closed to oil and gas leasing. Air quality enhancement, soil stabilization, and watershed protection would be emphasized. Habitats of major wildlife species and of threatened and endangered plants and animals would be actively managed, but no new livestock management actions would be implemented. The wild horse herd would be allowed to expand from 65 to 120 animals. Paleontological sites and 11,685 archaeological sites would be protected. Approximately 1319 acres of commercial forest land would be identified as suitable for management, and 2800 cords of fuel wood would be offered for sale annually. The three existing developed recreation sites would be maintained, and the Mud Springs site would be expanded to accommodate more group use.

  1. Resource management as a key factor for sustainable urban planning.

    PubMed

    Agudelo-Vera, Claudia M; Mels, Adriaan R; Keesman, Karel J; Rijnaarts, Huub H M

    2011-10-01

    Due to fast urbanization and increasing living standards, the environmental sustainability of our global society becomes more and more questionable. In this historical review we investigate the role of resources management (RM) and urban planning (UP) and propose ways for integration in sustainable development (SD). RM follows the principle of circular causation, and we reflect on to what extent RM has been an element for urban planning. Since the existence of the first settlements, a close relationship between RM, urbanization and technological development has been present. RM followed the demand for urban resources like water, energy, and food. In history, RM has been fostered by innovation and technology developments and has driven population growth and urbanization. Recent massive resource demand, especially in relation to energy and material flows, has altered natural ecosystems and has resulted in environmental degradation. UP has developed separately in response to different questions. UP followed the demand for improved living conditions, often associated to safety, good manufacturing and trading conditions and appropriate sanitation and waste management. In history UP has been a developing research area, especially since the industrial era and the related strong urbanization at the end of the 18th century. UP responded to new emerging problems in urban areas and became increasingly complex. Nowadays, UP has to address many objectives that are often conflicting, including, the urban sustainability. Our current urban un-sustainability is rooted in massive resource consumption and waste production beyond natural limits, and the absence of flows from waste to resources. Therefore, sustainable urban development requires integration of RM into UP. We propose new ways to this integration. PMID:21641714

  2. Guidelines for Analysis of Environmental Health Planning in Developing Countries. Volume 2: Environmental Health Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Fraser, Renee White; Shani, Hadasa

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this second of ten manuals in the International Health Planning Methods Series deals with assessment, planning, and evaluation in the field of environmental health.…

  3. Evaluating collaborative planning methods supporting programme-based planning in natural resource management.

    PubMed

    Vacik, Harald; Kurttila, Mikko; Hujala, Teppo; Khadka, Chiranjeewee; Haara, Arto; Pykäläinen, Jouni; Honkakoski, Päivi; Wolfslehner, Bernhard; Tikkanen, Jukka

    2014-11-01

    Programme-based Planning of Natural Resources (PBPNR) is an evolving planning frame for solving complex land use, environmental and forest management problems within hierarchically administrated funding and decision-making schemes. PBPNR acknowledges that an effective planning process requires the combined consideration of environmental, technological, economic and socio-political factors. To reach acceptability, commitment and operability, PBPNR processes need to foster collaboration and learning. For this study, an analysis of 43 collaborative planning methods was conducted to examine their potential to be applied within PBPNR. We present the approach of screening the applicability of methods for specific needs that may occur in PBPNR. The approach is based on a list of key criteria for the phases of a collaborative planning process: problem identification, problem modelling and problem solving. The features of each method were qualitatively assessed and peer-reviewed by a team of experts. Most of the methods are able to deal with qualitative data, support processes to increase transparency in planning and capture the preferences of the participating stakeholders. They also produce understandable results for the three phases. Contrarily, many methods do not offer features to handle uncertainty, nor do they satisfactorily stimulate creativity and innovation in the planning process. The results show that the overall applicability of the reviewed methods for the three planning phases varies according to a cluster analysis basing on the capabilities of the methods. Methods such as "Planning for Real", "Open Space" and "A'WOT" seem to be particularly promising for a broad range of planning situations.

  4. Evaluating collaborative planning methods supporting programme-based planning in natural resource management.

    PubMed

    Vacik, Harald; Kurttila, Mikko; Hujala, Teppo; Khadka, Chiranjeewee; Haara, Arto; Pykäläinen, Jouni; Honkakoski, Päivi; Wolfslehner, Bernhard; Tikkanen, Jukka

    2014-11-01

    Programme-based Planning of Natural Resources (PBPNR) is an evolving planning frame for solving complex land use, environmental and forest management problems within hierarchically administrated funding and decision-making schemes. PBPNR acknowledges that an effective planning process requires the combined consideration of environmental, technological, economic and socio-political factors. To reach acceptability, commitment and operability, PBPNR processes need to foster collaboration and learning. For this study, an analysis of 43 collaborative planning methods was conducted to examine their potential to be applied within PBPNR. We present the approach of screening the applicability of methods for specific needs that may occur in PBPNR. The approach is based on a list of key criteria for the phases of a collaborative planning process: problem identification, problem modelling and problem solving. The features of each method were qualitatively assessed and peer-reviewed by a team of experts. Most of the methods are able to deal with qualitative data, support processes to increase transparency in planning and capture the preferences of the participating stakeholders. They also produce understandable results for the three phases. Contrarily, many methods do not offer features to handle uncertainty, nor do they satisfactorily stimulate creativity and innovation in the planning process. The results show that the overall applicability of the reviewed methods for the three planning phases varies according to a cluster analysis basing on the capabilities of the methods. Methods such as "Planning for Real", "Open Space" and "A'WOT" seem to be particularly promising for a broad range of planning situations. PMID:24981159

  5. 75 FR 77654 - Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Bureau of Land Management Notice of Intent To Prepare a Land Use Plan Amendment and an Environmental..., biological resources, recreation, cultural resources, water resources, geological resources, land use, noise... the public of potential amendments to land use plans. The BLM will integrate the land use...

  6. Environmental development plan for transportation programs: FY80 update

    SciTech Connect

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  7. RPG1.06. Resource Planning Guide

    SciTech Connect

    Drazga, S.

    1993-05-01

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level is designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility`s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.

  8. RPG1.01. Resource Planning Guide

    SciTech Connect

    Drazga, S.

    1993-12-01

    RPG1.01 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.01 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level is designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.01 also contains three additional volumes. Getting Started is an introduction to RPG1.01. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility`s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.

  9. RPG1.03. Resource Planning Guide

    SciTech Connect

    Drazga, S,

    1993-05-01

    RPG1.03 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.03 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level is designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.03 also contains three additional volumes. Getting Started is an introduction to RPG1.03. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility`s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.

  10. Environmental Resources Analysis System, A Prototype DSS

    USGS Publications Warehouse

    Flug, M.; Campbell, S.G.; Bizier, P.; DeBarry, P.

    2003-01-01

    Since the 1960's, an increase in the public's environmental ethics, federal species preservation, water quality protection, and interest in free flowing rivers have evolved to the current concern for stewardship and conservation of natural resources. This heightened environmental awareness creates an appetite for data, models, information management, and systematic analysis of multiple scientific disciplines. A good example of this information and analysis need resides in the Green and Yampa Rivers, tributary to the Upper Colorado River. These rivers are home to endangered native fish species including the pikeminnow and razorback sucker. Two dams, Fontenelle and Flaming Gorge, impound the Green River headwaters. The respective reservoirs store water supplies as well as generate hydropower. Conversely, the Yampa River is considered unregulated and encompasses most of Dinosaur National Monument. Recreation is highly regarded on both rivers including fishing, whitewater rafting, and aesthetic values. Vast areas of irrigated agriculture, forestry, and mineral extraction also surround these rivers. To address this information need, we developed a prototype Environmental Resources Analysis System (ERAS) spreadsheet-based decision support system (DSS). ERAS provides access to historic data sets, scientific information, statistical analysis, model outputs, and comparative methods all in a familiar and user-friendly format. This research project demonstrates a simplified decision support system for use by a diverse mix of resource managers, special interest groups, and individuals concerned about the sustainability of the Green and Yampa River ecosystem.

  11. 78 FR 6783 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Flint Hills Resources...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... Hills Resources Pine Bend AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... State Implementation Plan for Flint Hills Resources Pine Bend, LLC, in Dakota County. This oil refinery... direct final rule without prior proposal because the Agency views this as a noncontroversial...

  12. 76 FR 59155 - Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... demands on the resources of the public lands; changing policies and emphasis on the management of public... Bureau of Land Management Notice of Availability of South Coast Draft Resource Management Plan Revision and Draft Environmental Impact Statement AGENCY: Bureau of Land Management, Interior. ACTION:...

  13. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  14. Children as a resource: environmental degradation and fertility.

    PubMed

    Joekes, S

    1994-06-01

    Through the use of case studies from Kenya, Malaysia, Mexico, and Morocco, the influence of environmental degradation on women's livelihoods and fertility is broadly examined. The aim is to show how the environment impacts on women's childbearing decisions, and the consequences. The evidence appears to support the notion that environmental pressures on women will contribute to higher fertility, under conditions of gender division of labor, a very low social status for women, and women's limited educational opportunity. The Kenya experiences were among rural villages in various agro-ecological zones in Embu, on the slopes of Mt. Kenya, and involved coping strategies with poor soils and very little rainfall. The Malaysian research focused on river communities in the rain forests of Limbang River Basin in Sarawak and the logging industry and government regulation of tribal land use rights. In mountainous Tetouan and A1 Hoceimain, Moroccan populations struggle with poor social services and little rainfall. The study areas in Morocco and Kenya had very high population growth, but declining growth rates nationally. The study areas suffered from deforestation, declines in water quality and availability, and soil erosion and depletion. Family planning services would be welcome: 1) when women do not have to solely bear the responsibility for the additional work involved in environmentally degraded areas; and 2) when the value of children is not increased. Policy must recognize that where rigid gender division of labor is prominent, children are a crucial resource for women in the provision of household support. The Morocco case exemplified the extremes of men's refusal to ease women's workloads with time and labor saving technology. Family planning promotion in such situations must be accompanied by provision of alternative resources to address the adverse environmental impacts on women. Blaming women for environmental problems and family planning promotion will fail to

  15. Children as a resource: environmental degradation and fertility.

    PubMed

    Joekes, S

    1994-06-01

    Through the use of case studies from Kenya, Malaysia, Mexico, and Morocco, the influence of environmental degradation on women's livelihoods and fertility is broadly examined. The aim is to show how the environment impacts on women's childbearing decisions, and the consequences. The evidence appears to support the notion that environmental pressures on women will contribute to higher fertility, under conditions of gender division of labor, a very low social status for women, and women's limited educational opportunity. The Kenya experiences were among rural villages in various agro-ecological zones in Embu, on the slopes of Mt. Kenya, and involved coping strategies with poor soils and very little rainfall. The Malaysian research focused on river communities in the rain forests of Limbang River Basin in Sarawak and the logging industry and government regulation of tribal land use rights. In mountainous Tetouan and A1 Hoceimain, Moroccan populations struggle with poor social services and little rainfall. The study areas in Morocco and Kenya had very high population growth, but declining growth rates nationally. The study areas suffered from deforestation, declines in water quality and availability, and soil erosion and depletion. Family planning services would be welcome: 1) when women do not have to solely bear the responsibility for the additional work involved in environmentally degraded areas; and 2) when the value of children is not increased. Policy must recognize that where rigid gender division of labor is prominent, children are a crucial resource for women in the provision of household support. The Morocco case exemplified the extremes of men's refusal to ease women's workloads with time and labor saving technology. Family planning promotion in such situations must be accompanied by provision of alternative resources to address the adverse environmental impacts on women. Blaming women for environmental problems and family planning promotion will fail to

  16. Environmental resources of selected areas of Hawaii: Socioeconomics

    SciTech Connect

    Saulsbury, J.W.; Sorensen, B.M.; Reed, R.M.; Schexnayder, S.M.

    1995-03-01

    This report has been prepared to make available and archive the background information on socioeconomic resources collected during the preparation of the environmental impact statement (EIS) for Phases 3--4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The USDOE published a notice withdrawing its Notice of Intent to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This document provides background information on socioeconomic resources in Hawaii County, with particular emphasis on the Puna District. Information is being made available for use by others in conducting future socioeconomic impact assessments in this area. this report describes existing socioeconomic resources in the areas studied and does not represent an assessment of environmental impacts. The socioeconomic resources described are primarily those that would be affected by employment and population growth associated with any future large-scale development. These resource categories are population, housing, land use, economic structure, infrastructure and public services, local government revenues and expenditures, and tourism and recreation.

  17. A Guide for Teaching Regional Environmental Planning. Final Report of Project - Inservice Personnel Development: Regional Environmental Planning Workshops for Tri-County Secondary School Teachers.

    ERIC Educational Resources Information Center

    Gallagher, James Joseph, Ed.

    This guide is designed for teachers, administrators, inservice leaders, and teacher educators. Its purpose is to provide an organizational framework, material, and resources for the development of instructional plans and strategies for incorporating regional environmental planning in the secondary school curriculum. The guide is divided into three…

  18. Developing a strategic human resources plan for the Urban Angel.

    PubMed

    Owen, Susan M

    2011-01-01

    In healthcare a significant portion of the budget is related to human resources. However, many healthcare organizations have yet to develop and implement a focused organizational strategy that ensures all human resources are managed in a way that best supports the successful achievement of corporate strategies. St. Michael's Hospital, in Toronto, Ontario, recognized the benefits of a strategic human resources management plan. During an eight-month planning process, St. Michael's Hospital undertook the planning for and development of a strategic human resources management plan. Key learnings are outlined in this paper.

  19. Handling uncertainty in quantitative estimates in integrated resource planning

    SciTech Connect

    Tonn, B.E.; Wagner, C.G.

    1995-01-01

    This report addresses uncertainty in Integrated Resource Planning (IRP). IRP is a planning and decisionmaking process employed by utilities, usually at the behest of Public Utility Commissions (PUCs), to develop plans to ensure that utilities have resources necessary to meet consumer demand at reasonable cost. IRP has been used to assist utilities in developing plans that include not only traditional electricity supply options but also demand-side management (DSM) options. Uncertainty is a major issue for IRP. Future values for numerous important variables (e.g., future fuel prices, future electricity demand, stringency of future environmental regulations) cannot ever be known with certainty. Many economically significant decisions are so unique that statistically-based probabilities cannot even be calculated. The entire utility strategic planning process, including IRP, encompasses different types of decisions that are made with different time horizons and at different points in time. Because of fundamental pressures for change in the industry, including competition in generation, gone is the time when utilities could easily predict increases in demand, enjoy long lead times to bring on new capacity, and bank on steady profits. The purpose of this report is to address in detail one aspect of uncertainty in IRP: Dealing with Uncertainty in Quantitative Estimates, such as the future demand for electricity or the cost to produce a mega-watt (MW) of power. A theme which runs throughout the report is that every effort must be made to honestly represent what is known about a variable that can be used to estimate its value, what cannot be known, and what is not known due to operational constraints. Applying this philosophy to the representation of uncertainty in quantitative estimates, it is argued that imprecise probabilities are superior to classical probabilities for IRP.

  20. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  1. 76 FR 62819 - Notice of Intent To Amend the Resource Management Plan for the San Luis Resource Area, Colorado...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ..., intends to prepare a Resource Management Plan (RMP) Amendment with an associated Environmental Assessment... and identify issues. DATES: This notice initiates the public scoping process for the RMP amendment and... local media and newspapers. In order to be included in the RMP amendment and associated EA, all...

  2. Columbia County Environmental Resource Guide, Grades 7-12.

    ERIC Educational Resources Information Center

    Bouie, Rosa; And Others

    This environmental resource guide consists of objectives for grades 7-12 and activities for juniors and seniors in high school. The environmental objectives include understanding the following concepts: (1) interdependency in nature; (2) finite resources; (3) wise use of resources; (4) change; and (5) man's environmental responsibility. The…

  3. California environmental resources evaluation system in the NBS partnership

    SciTech Connect

    Greenwood, G.B.

    1995-12-31

    The California Resources Agency launched the California Environmental Resources Evaluation System (CERES) in July, 1994 to provide information on the state`s ecological systems and conservation activities to citizens throughout California Operating off the Internet and using Mosaic software, CERES allows the public to search and locate information at different sites, including public to search and locate information at different sites, including public agencies, universities and local watershed groups. The project will coordinate the compilation of seamless datasets available on a distributed network of servers from state, federal and local sources to support resource management and conservation planning. The designation of CERES as a major initiative by the Resources Agency, in collaboration with the National Biological Survey and other state and federal agencies, reflects a new approach to biological conservation that recognizes multiple sources of authority for conservation that recognizes multiple sources of authority for conservation planning - from the local to the federal - as well as the central role of place in organizing citizens` perceptions of ecological systems. By facilitating the access of all stakeholders to information on the state`s ecological systems and conservation activities, CERES will promote a more profound public discussion and a more appropriate articulation of the relationship between social and ecological systems in the state.

  4. Exxon Valdez restoration plan. summary of the final environmental impact statement

    SciTech Connect

    1994-09-01

    The Exxon Valdez Trustee Council issued a draft Restoration Plan in November of 1993. The draft Restoration Plan provides long-term guidance for restoring the resources and services injured by the Exxon Valdez Oil Spill of March 24, 1989. This final Environmental Impact Statement (FEIS) analyzes the potential environmental impacts of the draft Restoration Plan as the Proposed Action - Alternative 5, and four other alternatives that provide different policies and emphasis than the proposed action.

  5. Master environmental plan for Fort Devens, Massachusetts

    SciTech Connect

    Biang, C.A.; Peters, R.W.; Pearl, R.H.; Tsai, S.Y. . Energy Systems Div.)

    1991-11-01

    Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifies additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.

  6. The department manager and effective human resource planning: an overview.

    PubMed

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed. PMID:17314626

  7. The department manager and effective human resource planning: an overview.

    PubMed

    Arnold, Edwin; Pulich, Marcia

    2007-01-01

    Department managers in health care organizations play a pivotal role in ensuring the success of human resource (HR) planning. This article describes HR planning and its importance to the organization and department managers. Organizational support necessary for effective HR planning is also covered. The HR planning process is examined. Managerial responsibilities such as interviewing and performance appraisal and their relationship to HR planning are discussed.

  8. Human Resource Planning: Challenges for Industrial/Organizational Psychologists.

    ERIC Educational Resources Information Center

    Jackson, Susan E.; Schuler, Randall S.

    1990-01-01

    Describes activities that industrial/organizational psychologists engage in as they seek to improve the competitiveness of organizations through effective human resource planning. Presents a model for describing human resource short-term, intermediate-term, and long-term planning. (JS)

  9. Increasing Organizational Effectiveness through Better Human Resource Planning and Development

    ERIC Educational Resources Information Center

    Schein, Edgar H.

    1977-01-01

    Discusses the increasing importance of human resource planning and development for organizational effectiveness, and examines how the major components of a human resource planning and development system should be coordinated for maximum effectiveness. Available from Alfred P. Sloan School of Management, Massachusetts Institute of Technology,…

  10. Materials Handling and Structures 01.0302 for Agribusiness, Natural Resources, and Environmental Occupations.

    ERIC Educational Resources Information Center

    Finstad, Dennis; And Others

    The document presents unit plans which offer lists of experiences and competencies to be learned in the area of materials handling and structuring for agribusiness, natural resources, and environmental occupations. The units include: (1) farmstead planning and reorganization; (2) site preparation (contour, terraces, waterways; land measurements…

  11. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  12. Waste Isolation Pilot Plant Environmental Monitoring Plan

    SciTech Connect

    Westinghouse Electric Company Waste Isolation Division

    1999-09-29

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement

  13. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    SciTech Connect

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  14. North Slope Decision Support for Water Resource Planning and Management

    SciTech Connect

    Schnabel, William; Brumbelow, Kelly

    2013-03-31

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaska’s North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaska’s North Slope.

  15. Resource Planning for Massive Number of Process Instances

    NASA Astrophysics Data System (ADS)

    Xu, Jiajie; Liu, Chengfei; Zhao, Xiaohui

    Resource allocation has been recognised as an important topic for business process execution. In this paper, we focus on planning resources for a massive number of process instances to meet the process requirements and cater for rational utilisation of resources before execution. After a motivating example, we present a model for planning resources for process instances. Then we design a set of heuristic rules that take both optimised planning at build time and instance dependencies at run time into account. Based on these rules we propose two strategies, one is called holistic and the other is called batched, for resource planning. Both strategies target a lower cost, however, the holistic strategy can achieve an earlier deadline while the batched strategy aims at rational use of resources. We discuss how to find balance between them in the paper with a comprehensive experimental study on these two approaches.

  16. Environmental Restoration Program Document Control Plan

    SciTech Connect

    Montgomery, L.M.

    1993-09-01

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  17. 75 FR 66038 - Planning Resource Adequacy Assessment Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... Standard that applies to planning coordinators. E. Provision of Data 26. Proposed Reliability Standard BAL... Federal Energy Regulatory Commission 18 CFR Part 40 Planning Resource Adequacy Assessment Reliability... Regulatory Commission proposes to approve a regional Reliability Standard, BAL-502-RFC-02, Planning...

  18. Making family planning accessible in resource-poor settings.

    PubMed

    Prata, Ndola

    2009-10-27

    It is imperative to make family planning more accessible in low resource settings. The poorest couples have the highest fertility, the lowest contraceptive use and the highest unmet need for contraception. It is also in the low resource settings where maternal and child mortality is the highest. Family planning can contribute to improvements in maternal and child health, especially in low resource settings where overall access to health services is limited. Four critical steps should be taken to increase access to family planning in resource-poor settings: (i) increase knowledge about the safety of family planning methods; (ii) ensure contraception is genuinely affordable to the poorest families; (iii) ensure supply of contraceptives by making family planning a permanent line item in healthcare system's budgets and (iv) take immediate action to remove barriers hindering access to family planning methods. In Africa, there are more women with an unmet need for family planning than women currently using modern methods. Making family planning accessible in low resource settings will help decrease the existing inequities in achieving desired fertility at individual and country level. In addition, it could help slow population growth within a human rights framework. The United Nations Population Division projections for the year 2050 vary between a high of 10.6 and a low of 7.4 billion. Given that most of the growth is expected to come from today's resource-poor settings, easy access to family planning could make a difference of billions in the world in 2050. PMID:19770158

  19. Environmental planning and management in Greater Johannesburg.

    PubMed

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  20. Resource management plan for the Oak Ridge Reservation

    SciTech Connect

    Parr, P.D. ); Evans, J.W. )

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

  1. Enterprise Resource Planning Software in the Human Resource Classroom

    ERIC Educational Resources Information Center

    Bedell, Michael D.; Floyd, Barry D.; Nicols, Kay McGlashan; Ellis, Rebecca

    2007-01-01

    The relatively recent development of comprehensive human resource information systems (HRIS) software has led to a large demand for technologically literate human resource (HR) professionals. For the college student who is about to begin the search for that first postcollege job, the need to develop technology literacy is even more necessary. To…

  2. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current

  3. Converting environmental wastes into valuable resources

    NASA Astrophysics Data System (ADS)

    Duval, Leonard A.

    1993-02-01

    This concept employs a viable energy saving method that uses a solvent to separate oil from particle matter; it can be used in metal forming industries to deoil sludges, oxides, and particle matter that is presently committed to landfill. If oily particles are used in their oily state, severe consequences to environmental control systems such as explosions or filter blinding, occur in the air handling equipment. This is due to the presence of hydrocarbons in the stack gasses resulting from the oily particles. After deoiling, the particles can be recycled and the separated oil can be used as a fuel. The process does not produce a waste of it's own and does not harm air or water. It demonstrates the dual benefits of it being commercially viable and in the national interest of conserving resources.

  4. Converting environmental wastes into valuable resources

    NASA Technical Reports Server (NTRS)

    Duval, Leonard A.

    1993-01-01

    This concept employs a viable energy saving method that uses a solvent to separate oil from particle matter; it can be used in metal forming industries to deoil sludges, oxides, and particle matter that is presently committed to landfill. If oily particles are used in their oily state, severe consequences to environmental control systems such as explosions or filter blinding, occur in the air handling equipment. This is due to the presence of hydrocarbons in the stack gasses resulting from the oily particles. After deoiling, the particles can be recycled and the separated oil can be used as a fuel. The process does not produce a waste of it's own and does not harm air or water. It demonstrates the dual benefits of it being commercially viable and in the national interest of conserving resources.

  5. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  6. 78 FR 45266 - Notice of Intent To Prepare a Resource Management Plan for the Oklahoma, Kansas, and Texas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... incorporate, where applicable, management decisions brought forward from existing planning documents. 6... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the Oklahoma, Kansas, and Texas Planning Area and an Associated Environmental Impact Statement AGENCIES: Bureau of...

  7. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  8. Preservation Planning Program. Resource Notebook. Revised Edition.

    ERIC Educational Resources Information Center

    Darling, Pamela W., Comp.

    Designed to be used with the Association of Research Libraries (ARL) "Preservation Planning Program Manual," this notebook provides access to background and technical information needed for planning and carrying out a variety of preservation programs and activities. Its contents, all drawn from the body of preservation literature available in late…

  9. Environmentally Sound Small-Scale Agricultural Projects: Guidelines for Planning. Revised Edition.

    ERIC Educational Resources Information Center

    Altieri, Miguel; Vukasin, Helen L., Ed.

    Environmental planning requires more than finding the right technology and a source of funds. Planning involves consideration of the social, cultural, economic, and natural environments in which the project occurs. The challenge is to develop sustainable food systems that have reasonable production but do not degrade the resource base and upset…

  10. Environmental restoration and remediation technical data management plan

    SciTech Connect

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

  11. Developing a collaborative model for environmental planning and management

    NASA Astrophysics Data System (ADS)

    Selin, Steve; Chevez, Deborah

    1995-03-01

    Methods for involving the public in natural resource management are changing as agencies adjust to an increasingly turbulent social and political environment. There is growing interest among managers and scholars in collaborative approaches to public involvement. Collaboration is conceptually defined and elaborated using examples from the natural resource management field. This paper then examines how collaboration theory from the organizational behavior field can help environmental managers to better understand those factors that facilitate and inhibit collaborative solutions to resource problems. A process-oriented model is presented that proposes that collaboration emerges out of an environmental context and then proceeds sequentially through a problem-setting, direction-setting, and structuring phase. Factors constraining collaboration are also specified, including organizational culture and power differentials. Designs for managing collaboration are identified, which include appreciative planning, joint agreements, dialogues, and negotiated settlements. Environmental managers need new skills to manage collaboration within a dynamic social and political environment. Further research is needed to test the propositions outlined here.

  12. Reprint of: environmental information for military planning.

    PubMed

    Doherty, Victoria; Croft, Darryl; Knight, Ashley

    2013-11-01

    A study was conducted to consider the implications of presenting Environmental Information (EI; information on current environmental features including weather, topography and visibility maps) for military planning to the growing audience of non-technical users; to provide guidance for ensuring usability and for development of a suitable EI interface, and to produce an EI concept interface mock-up to demonstrate initial design ideas. Knowledge was elicited from current EI users and providers regarding anticipated use of EI by non-specialists. This was combined with human factors and cognition expertise to produce guidance for data usability and development of an EI interface. A simple mock-up of an EI concept interface was developed. Recommendations for further development were made including application of the guidance derived, identification of a user test-bed and development of business processes. PMID:23876986

  13. Bayesian statistics in environmental engineering planning

    SciTech Connect

    Englehardt, J.D.; Simon, T.W.

    1999-07-01

    Today's engineer must be able to quantify both uncertainty due to information limitations, and the variability of natural processes, in order to determine risk. Nowhere is this emphasis on risk assessment more evident than in environmental engineering. The use of Bayesian inference for the rigorous assessment of risk based on available information is reviewed in this paper. Several example environmental engineering planning applications are presented: (1) assessment of losses involving the evaluation of proposed revisions to the South Florida Building Code after Hurricane Andrew; (2) development of a model to predict oil spill consequences due to proposed changes in the oil transportation network in the Gulf of Mexico; (3) studies of ambient concentrations of perchloroethylene surrounding dry cleaners and of tire particulates in residential areas near roadways in Miami, FL; (4) risk assessment from contaminated soils at a cleanup of an old transformer dump site.

  14. 62. Photocopy of Photocopy (from Planning Resources file, October 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. Photocopy of Photocopy (from Planning Resources file, October 3, 1989) INTERIOR OF CLOCK TOWER SHOWING BELLS, SUPPORT STRUCTURES AND CLAPPERS - Crestline City Hall, Bucyrus & Thoman Streets, Crestline, Crawford County, OH

  15. 61. Photocopy of Photograph (from Planning REsources file, October 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. Photocopy of Photograph (from Planning REsources file, October 3, 1989 (INTERIOR OF CLOCK TOWER SHOWING BELLS, SUPPORT STRUCTURE AND CLAPPERS - Crestline City Hall, Bucyrus & Thoman Streets, Crestline, Crawford County, OH

  16. Risk Analysis for Resource Planning Optimization

    NASA Technical Reports Server (NTRS)

    Chueng, Kar-Ming

    2008-01-01

    The main purpose of this paper is to introduce a risk management approach that allows planners to quantify the risk and efficiency tradeoff in the presence of uncertainties, and to make forward-looking choices in the development and execution of the plan. Demonstrate a planning and risk analysis framework that tightly integrates mathematical optimization, empirical simulation, and theoretical analysis techniques to solve complex problems.

  17. 76 FR 37145 - Notice of Intent To Prepare a Resource Management Plan Amendment (RMPA) and Associated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Environmental Assessment (EA) in response to four coal lease applications covering lands in Haskell and LeFlore... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan Amendment (RMPA) and... Counties, OK AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: In...

  18. Treatment of Solar Generation in Electric Utility Resource Planning

    SciTech Connect

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  19. Directory of Ohio Environmental Education Sites and Resources.

    ERIC Educational Resources Information Center

    Mourad, Teresa; Morrone, Michele

    This publication is the result of a collaboration between the Environmental Education Council of Ohio (EECO) and the Office of Environmental Education at the Ohio Environmental Protection Agency (OEPA). This directory of environmental education resources within the state of Ohio is intended to assist educators in finding information that can…

  20. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  1. Spotsylvania County Intermediate Schools Resource Notebook. Career Education Lesson Plans.

    ERIC Educational Resources Information Center

    Spotsylvania County Public Schools, VA.

    This resource notebook contains lesson plans for use in providing career education to students in grades 6, 7, and 8. Lessons plans are organized into sections addressing the following subject areas: language arts and foreign language, reading, mathematics, science, social studies, health and physical education, special education, and fine arts…

  2. Participation, Decentralization, and Advocacy Planning, Resource Paper No. 25.

    ERIC Educational Resources Information Center

    Kasperson, Roger E.; Breitbart, Myrna

    This resource paper on the subject of citizen participation, decentralization, and advocacy planning is part of a series designed to supplement undergraduate geography courses. The approach of the paper de-emphasizes inventory or case study reviews of specific participation or advocacy planning projects for a more general conceptual discussion of…

  3. Getting Human Resource Planning on the Dean's List.

    ERIC Educational Resources Information Center

    Vetter, Eric W.

    1985-01-01

    The author analyzes human resource planning, in which he gives the various aspects of career development a report card that, the author states, shows the field is far from achieving its self-stated goals. He states that succession planning and systems approaches would help this situation. (CT)

  4. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610.4 Section 1610.4 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING,...

  5. Human Resource Development Planning Based on Accreditation Guidelines.

    ERIC Educational Resources Information Center

    Dowd, Steven B.

    This paper presents a preliminary human resource development plan for the radiography program sponsored by Lincoln Land Community College (Illinois). The plan is based on the "Essentials and Guidelines of an Accredited Program for the Radiographer," initially adopted in 1944, and most recently revised in 1990, it involves the integration of…

  6. The Setting Up of a Resources Centre. 2: Planning & Staffing.

    ERIC Educational Resources Information Center

    Tucker, Richard N.

    Produced for use by educators and administrators in Scotland involved in planning and developing learning resources centers in elementary and secondary schools, this guide contains: (1) examples and discussion of the allocation of space for resources centers in schools with different architectural layouts, (2) three case studies of schools which…

  7. Environmental Restoration and Waste Management: Strategic plan

    SciTech Connect

    Not Available

    1994-09-01

    The Brookhaven National Laboratory (BNL) site is currently divided into five major areas, Operable Units (OUs), and several Areas of Concern (AOCs), which are the focus of investigation and clean-up. The primary environmental concern is groundwater contamination and a major emphasis of the restoration activities is focused on this medium. Each year, BNL generates 60 tons of hazardous waste and 7,000 to 8,000 cubic feet of radioactive waste that result from research activities. These wastes are collected at a central location, packaged and shipped off site for disposal. The operations for Hazardous and Radioactive Waste Management are conducted in compliance with EPA and DOE regulations. BNL has continued to actively pursue means by which these wastes may be minimized. Activities in both the remediation and waste management arenas are intimately connected with the future vision of BNL. The long-range goal for remediation in conjunction with vigorous monitoring of BNL`s activities is to restore the site and maintain strong environmental controls. The goals of the waste minimization program include activities to find environmentally safe alternatives to materials currently in use. By careful planning, BNL will minimize the amount of all waste, including sanitary, that is generated on site.

  8. Learning for Sustainability: NSW Environmental Education Plan, 2002-05.

    ERIC Educational Resources Information Center

    2002

    This document is the first three-year environmental education plan for New South Wales (NSW), Australia. The plan is guided by a vision to achieve effective and integrated environmental education which builds the capacity of the people of NSW to be informed and active participants in moving society towards sustainability. The plan's priority…

  9. Funding the Plan: Integration of Strategic Planning and Resource Allocation

    ERIC Educational Resources Information Center

    Pagel, Richard T.

    2011-01-01

    California Community Colleges are facing increased accountability while at the same time experiencing reduced and uncertain state funding. When resources are not properly allocated there is waste, public criticism, and ultimately increased oversight. A review of the Accrediting Commission for Community and Junior Colleges (ACCJC) sanction letters…

  10. 76 FR 39470 - Integrated Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ..., and energy storage resources. Each portfolio was optimized for the lowest net Present Value of Revenue... both peak load (in MW) and annual net system energy (in GWh) through 2029. Peak load is predicted to... under the high-growth forecast. Net system energy is predicted to grow at an average annual rate of...

  11. 76 FR 57100 - Natural Resource Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... published a notice of intent to prepare an EIS and to conduct a comprehensive study of its future energy and... its natural resource management activities. Since then, the Energy and Water Development Act of 1998... would emphasize key programs that are integral toward enhancing future implementation efforts...

  12. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  13. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    SciTech Connect

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  14. The Best Laid Plans: Community-Based Natural Resource Management (CBNRM) Group Capacity and Planning Success

    NASA Astrophysics Data System (ADS)

    Mountjoy, Natalie J.; Seekamp, Erin; Davenport, Mae A.; Whiles, Matt R.

    2013-12-01

    As community-based natural resource management (CBNRM) increases in popularity, the question of the capacity of such groups to successfully manage natural resources becomes increasingly relevant. However, few studies have quantifiably analyzed how the amount or type of capacity in a CBNRM organization directly affects the outputs or the environmental outcomes produced. This paucity of research exists in part due to the diversity of indicators for CBNRM group capacity, as well as the ensuing debate over how to best define and measure success in CBNRM initiatives. Although concrete outputs vary widely, many efforts center on creating natural resource management plans (RMPs). The primary objective of our research was to explore the link between capacity and RMP implementation success, as perceived by practitioners among CBNRM groups across Illinois. A short online survey was constructed, utilizing findings from focus groups in combination with an extensive literature review, to measure CBNRM participants' ( n = 190) perceptions of 10 key capacity indicators and RMP implementation success. Results show that capacity perceptions varied significantly among respondents in low, moderate, and high RMP implementation success groups, and that group capacity was predictive of the degree of perceived RMP implementation success. Further, our findings suggest that bonding social capital and outreach are crucial in predicting low versus moderate RMP success, while leadership, motivation, and vision best distinguish the moderately successful and highly successful groups.

  15. The best laid plans: community-based natural resource management (CBNRM) group capacity and planning success.

    PubMed

    Mountjoy, Natalie J; Seekamp, Erin; Davenport, Mae A; Whiles, Matt R

    2013-12-01

    As community-based natural resource management (CBNRM) increases in popularity, the question of the capacity of such groups to successfully manage natural resources becomes increasingly relevant. However, few studies have quantifiably analyzed how the amount or type of capacity in a CBNRM organization directly affects the outputs or the environmental outcomes produced. This paucity of research exists in part due to the diversity of indicators for CBNRM group capacity, as well as the ensuing debate over how to best define and measure success in CBNRM initiatives. Although concrete outputs vary widely, many efforts center on creating natural resource management plans (RMPs). The primary objective of our research was to explore the link between capacity and RMP implementation success, as perceived by practitioners among CBNRM groups across Illinois. A short online survey was constructed, utilizing findings from focus groups in combination with an extensive literature review, to measure CBNRM participants' (n = 190) perceptions of 10 key capacity indicators and RMP implementation success. Results show that capacity perceptions varied significantly among respondents in low, moderate, and high RMP implementation success groups, and that group capacity was predictive of the degree of perceived RMP implementation success. Further, our findings suggest that bonding social capital and outreach are crucial in predicting low versus moderate RMP success, while leadership, motivation, and vision best distinguish the moderately successful and highly successful groups.

  16. The best laid plans: community-based natural resource management (CBNRM) group capacity and planning success.

    PubMed

    Mountjoy, Natalie J; Seekamp, Erin; Davenport, Mae A; Whiles, Matt R

    2013-12-01

    As community-based natural resource management (CBNRM) increases in popularity, the question of the capacity of such groups to successfully manage natural resources becomes increasingly relevant. However, few studies have quantifiably analyzed how the amount or type of capacity in a CBNRM organization directly affects the outputs or the environmental outcomes produced. This paucity of research exists in part due to the diversity of indicators for CBNRM group capacity, as well as the ensuing debate over how to best define and measure success in CBNRM initiatives. Although concrete outputs vary widely, many efforts center on creating natural resource management plans (RMPs). The primary objective of our research was to explore the link between capacity and RMP implementation success, as perceived by practitioners among CBNRM groups across Illinois. A short online survey was constructed, utilizing findings from focus groups in combination with an extensive literature review, to measure CBNRM participants' (n = 190) perceptions of 10 key capacity indicators and RMP implementation success. Results show that capacity perceptions varied significantly among respondents in low, moderate, and high RMP implementation success groups, and that group capacity was predictive of the degree of perceived RMP implementation success. Further, our findings suggest that bonding social capital and outreach are crucial in predicting low versus moderate RMP success, while leadership, motivation, and vision best distinguish the moderately successful and highly successful groups. PMID:24104728

  17. 14 CFR 1216.319 - Environmental resources document.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (see 14 CFR 1216.307). This document shall be coordinated with the Associate Administrator for... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Environmental resources document. 1216.319... Environmental resources document. Each Field Installation Director shall ensure that there exists...

  18. 14 CFR 1216.319 - Environmental resources document.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (see 14 CFR 1216.307). This document shall be coordinated with the Associate Administrator for... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Environmental resources document. 1216.319... Environmental resources document. Each Field Installation Director shall ensure that there exists...

  19. 14 CFR 1216.319 - Environmental resources document.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (see 14 CFR 1216.307). This document shall be coordinated with the Associate Administrator for... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Environmental resources document. 1216.319... Environmental resources document. Each Field Installation Director shall ensure that there exists...

  20. Dynamic resource allocation in conservation planning

    USGS Publications Warehouse

    Golovin, D.; Krause, A.; Gardner, B.; Converse, S.J.; Morey, S.

    2011-01-01

    Consider the problem of protecting endangered species by selecting patches of land to be used for conservation purposes. Typically, the availability of patches changes over time, and recommendations must be made dynamically. This is a challenging prototypical example of a sequential optimization problem under uncertainty in computational sustainability. Existing techniques do not scale to problems of realistic size. In this paper, we develop an efficient algorithm for adaptively making recommendations for dynamic conservation planning, and prove that it obtains near-optimal performance. We further evaluate our approach on a detailed reserve design case study of conservation planning for three rare species in the Pacific Northwest of the United States. Copyright ?? 2011, Association for the Advancement of Artificial Intelligence. All rights reserved.

  1. Local government involvement in long term resource planning for community energy systems

    SciTech Connect

    Not Available

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  2. Local government involvement in long term resource planning for community energy systems. Demand side management

    SciTech Connect

    Not Available

    1992-03-01

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  3. NLM Web Resources for Environmental Health and Biomedical Research

    SciTech Connect

    Foster, R.

    2010-09-12

    The National Library of Medicine (NLM) is sponsoring this course to increase awareness of the availability and value of NLM’s online environmental health and toxicology information resources that provide invaluable tools to address these issues—for professionals and consumers alike. Participants will receive hands-on practice with selected NLM resources, and demonstrations of other valuable resources will be provided.

  4. Environmental Action Energy Conservation. Teacher Resource Guide.

    ERIC Educational Resources Information Center

    1998

    The environmental education curriculum called Environment ACTION is designed to empower students with the knowledge and skills necessary to make meaningful environmental changes. This module provides step-by-step instructions on how to explore the sources, production, uses, and environmental effects of energy in their schools and home. There are…

  5. Strategic environmental assessment of hydrological and irrigation plans in Castilla y Leon, Spain

    SciTech Connect

    Hedo, D.; Bina, O. )

    1999-05-01

    The study illustrates how strategic environmental assessment (SEA) can promote sustainable development plans. It defines and applies an SEA methodology to two draft plans: the hydrological plan for the Duero basin in Spain and the irrigation plan for the region of Castilla y Leon. Although prepared by national and regional authorities, respectively, both draft plans refer to the management and use of water as a resource for economic development and refer roughly to the same area. The SEA addresses the environmental, economic, and social impacts of the combined draft plans, using relevant indicators and objectives. The analysis shows that the proposals would lead to high financial costs and significant negative impacts on the environment for each job created; it develops and assesses a number of alternatives that would address these impacts. The results are used to define SEA procedures for the new Structural Funds period (2000--2006) and will provide a useful lesson for plans at all levels of government within Spain.

  6. A stochastic optimization approach for integrated urban water resource planning.

    PubMed

    Huang, Y; Chen, J; Zeng, S; Sun, F; Dong, X

    2013-01-01

    Urban water is facing the challenges of both scarcity and water quality deterioration. Consideration of nonconventional water resources has increasingly become essential over the last decade in urban water resource planning. In addition, rapid urbanization and economic development has led to an increasing uncertain water demand and fragile water infrastructures. Planning of urban water resources is thus in need of not only an integrated consideration of both conventional and nonconventional urban water resources including reclaimed wastewater and harvested rainwater, but also the ability to design under gross future uncertainties for better reliability. This paper developed an integrated nonlinear stochastic optimization model for urban water resource evaluation and planning in order to optimize urban water flows. It accounted for not only water quantity but also water quality from different sources and for different uses with different costs. The model successfully applied to a case study in Beijing, which is facing a significant water shortage. The results reveal how various urban water resources could be cost-effectively allocated by different planning alternatives and how their reliabilities would change.

  7. Ouray Colorado resource characteristics and future plans

    SciTech Connect

    McCarthy, K.P.

    1981-10-01

    Ouray, Colorado, at 7800 feet, lies in a natural amphitheater in the northern portion of the San Juan Mountains. Mining and tourism are the primary industries; each fluctuating between boom or bust; mining erratically; tourism seasonally. The hot springs in the area average from 80/sup 0/ to 152/sup 0/F and discharge from 2 to 200 gallons per minute. The resource is probably associated with circulation along deep normal faults with a limestone aquifer dispersing the hot water. It is estimated that 2256 x 10/sup 11/ Btu's of geothermal energy are available in the area. The springs are used in a pool, and for space heating. An unsolicited proposal for additional resource assessment and engineering was rejected by DOE. An Appropriate Technology Small Grant was applied for, and an A and E subcontract is being applied for. Independent development is happening nearby in exploration drilling for space heating needs. The city will pursue a heating district scheme involving use of the pool spring, or drilling a well as funding dictates. The city has unique funding problems involving an unstable seasonal economy, desire to continue to maintain the hot springs pool, impatient citizenry, and nervous spa owners.

  8. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    SciTech Connect

    Not Available

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  9. Agricultural Machinery 01.0301 for Agribusiness, Natural Resources and Environmental Occupations.

    ERIC Educational Resources Information Center

    Wright, John; And Others

    The document presents unit plans which offer lists of experiences and competencies to be learned in the area of agricultural machinery for agribusiness, natural resources, and environmental occupations. The units include: (1) safety; (2) agricultural service center; (3) component parts--bearings, gears, pulleys, clutches, and others; (4) metal…

  10. Resource Constrained Planning of Multiple Projects with Separable Activities

    NASA Astrophysics Data System (ADS)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  11. Geothermal resource area 9: Nye County. Area development plan

    SciTech Connect

    Pugsley, M.

    1981-01-01

    Geothermal Resource area 9 encompasses all of Nye County, Nevada. Within this area there are many different known geothermal sites ranging in temperature from 70/sup 0/ to over 265/sup 0/ F. Fifteen of the more major sites have been selected for evaluation in this Area Development Plan. Various potential uses of the energy found at each of the resource sites discussed in this Area Development Plan were determined after evaluating the area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities, and comparing those with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the 15 geothermal sites considered in this Area Development Plan are summarized.

  12. High-performance cyberinfrastructure for water resource planning and management

    NASA Astrophysics Data System (ADS)

    Jones, N.; Ogden, F. L.; Nelson, J.

    2012-12-01

    Water resource managers face increasingly difficult challenges as population growth leads to unprecedented demands on our finite supply of fresh water. Resolving water disputes and planning for growth demand increasingly sophisticated simulation tools involving complex spatial data and high-performance models and hardware. In additional to technological complexity, the range of input from social, environmental, and political decision makers required to make appropriate decisions has widened. Unfortunately, running such models is often beyond the capability of water managers and other stakeholders and/or is cost prohibitive to be used on a routine basis. In this presentation, we present a new NSF EPSCoR-funded project featuring four universities from Utah and Wyoming. One of the objectives of this project is the development of cyberinfrastructure for community-based modeling tools hosted on the Cloud and accessed via web-based interfaces. A primary hurdle in developing such tools is that each model is unique and involves a different set of inputs, outputs, and criteria for analysis. Therefore, coding a custom web-application from scratch for each Cloud-based modeling application is not feasible. To address this issue, we are developing a library of low-level GIS-based geoprocessing tools which can be configured via a simple scripting language to build custom workflows involving complex spatial data and high-resolution numerical models. We are also developing a suite of tools for hosting such workflows via a simple, yet powerful web-interface. This library will provide a template for delivering powerful modeling tools and access to spatial information to the hands of the managers and decision makers involved in water resources. We demonstrate this strategy using a web-based simulation environment built for the State of Utah Department of Water Rights. This tool is used to simulate the impact of proposed wells on existing water rights, including water table drawdown

  13. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    SciTech Connect

    Bolinger, Mark; Wiser, Ryan

    2005-08-10

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  14. Competition between movement plans increases motor variability: evidence of a shared resource for movement planning.

    PubMed

    Oostwoud Wijdenes, Leonie; Ivry, Richard B; Bays, Paul M

    2016-09-01

    Do movement plans, like representations in working memory, share a limited pool of resources? If so, the precision with which each individual movement plan is specified should decrease as the total number of movement plans increases. To explore this, human participants made speeded reaching movements toward visual targets. We examined if preparing one movement resulted in less variability than preparing two movements. The number of planned movements was manipulated in a delayed response cueing procedure that limited planning to a single target (experiment 1) or hand (experiment 2) or required planning of movements toward two targets (or with two hands). For both experiments, initial movement direction variability was higher in the two-plan condition than in the one-plan condition, demonstrating a cost associated with planning multiple movements, consistent with the limited resource hypothesis. In experiment 3, we showed that the advantage in initial variability of preparing a single movement was present only when the trajectory could be fully specified. This indicates that the difference in variability between one and two plans reflects the specification of full motor plans, not a general preparedness to move. The precision cost related to concurrent plans represents a novel constraint on motor preparation, indicating that multiple movements cannot be planned independently, even if they involve different limbs. PMID:27358315

  15. Competition between movement plans increases motor variability: evidence of a shared resource for movement planning

    PubMed Central

    Ivry, Richard B.

    2016-01-01

    Do movement plans, like representations in working memory, share a limited pool of resources? If so, the precision with which each individual movement plan is specified should decrease as the total number of movement plans increases. To explore this, human participants made speeded reaching movements toward visual targets. We examined if preparing one movement resulted in less variability than preparing two movements. The number of planned movements was manipulated in a delayed response cueing procedure that limited planning to a single target (experiment 1) or hand (experiment 2) or required planning of movements toward two targets (or with two hands). For both experiments, initial movement direction variability was higher in the two-plan condition than in the one-plan condition, demonstrating a cost associated with planning multiple movements, consistent with the limited resource hypothesis. In experiment 3, we showed that the advantage in initial variability of preparing a single movement was present only when the trajectory could be fully specified. This indicates that the difference in variability between one and two plans reflects the specification of full motor plans, not a general preparedness to move. The precision cost related to concurrent plans represents a novel constraint on motor preparation, indicating that multiple movements cannot be planned independently, even if they involve different limbs. PMID:27358315

  16. Environmental Measurements Laboratory 2002 Unit Performance Plan

    SciTech Connect

    2001-10-01

    This EML Unit Performance Plan provides the key goals and performance measures for FY 2002 and continuing to FY 2003. The purpose of the Plan is to inform EML's stakeholders and customers of the Laboratory's products and services, and its accomplishments and future challenges. Also incorporated in the Unit Performance Plan is EML's Communication Plan for FY 2002.

  17. 77 FR 71824 - Notice of Intent To Prepare an Amendment to the Redding Resource Management Plan and an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... Bureau of Land Management Notice of Intent To Prepare an Amendment to the Redding Resource Management... Resource Management Plan (RMP) with an associated Environmental Assessment (EA) to analyze the sale of the... from local governments as the primary preliminary issue of concern. The BLM anticipates that the...

  18. Value of Landsat in urban water resources planning

    NASA Technical Reports Server (NTRS)

    Jackson, T. J.; Ragan, R. M.

    1977-01-01

    The reported investigation had the objective to evaluate the utility of satellite multispectral remote sensing in urban water resources planning. The results are presented of a study which was conducted to determine the economic impact of Landsat data. The use of Landsat data to estimate hydrologic model parameters employed in urban water resources planning is discussed. A decision regarding an employment of the Landsat data has to consider the tradeoff between data accuracy and cost. Bayesian decision theory is used in this connection. It is concluded that computer-aided interpretation of Landsat data is a highly cost-effective method of estimating the percentage of impervious area.

  19. Lewin's Theory of Planned Change as a strategic resource.

    PubMed

    Shirey, Maria R

    2013-02-01

    This department highlights change management strategies that may be successful in strategically planning and executing organizational change initiatives. With the goal of presenting practical approaches helpful to nurse leaders advancing organizational change, content includes evidence-based projects, tools, and resources that mobilize and sustain organizational change initiatives. In this article, the author explores the use of the Lewin's Theory of Planned Change as a strategic resource to mobilize the people side of change. An overview of the theory is provided along with a discussion of its strengths, limitations, and targeted application.

  20. Human Resources Staffing Plan for the Tank Farm Contractor

    SciTech Connect

    BOSLEY, J.W.

    2000-04-22

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline.

  1. Using FRAMES to Manage Environmental and Water Resources

    SciTech Connect

    Whelan, Gene; Millard, W. David; Gelston, Gariann M.; Khangaonkar, Tarang P.; Pelton, Mitch A.; Strenge, Dennis L.; Yang, Zhaoqing; Lee, Cheegwan; Sivaraman, Chitra; Stephan, Alex J.; Hoopes, Bonnie L.; Castleton, Karl J.

    2007-05-16

    The Framework for Risk Analysis in Multimedia Environmental Systems FRAMES) is decision-support middleware that provides users the ability to design software solutions for complex problems. It is a software platform that provides seamless and transparent communication between modeling components by using a multi-thematic approach to provide a flexible and holistic understanding of how environmental factors potentially affect humans and the environment. It incorporates disparate components (e.g., models, databases, and other frameworks) that integrate across scientific disciplines, allowing for tailored solutions to specific activities. This paper discusses one example application of FRAMES, where several commercialoff-the-shelf (COTS) software products are seamlessly linked into a planning and decision-support tool that helps manage water-based emergency situations and sustainable response. Multiple COTS models, including three surface water models, and a number of databases are linked through FRAMES to assess the impact of three asymmetric and simultaneous events, two of which impact water resources. The asymmetric events include 1) an unconventional radioactive release into a large potable water body, 2) a conventional contaminant (oil) release into navigable waters, and 3) an instantaneous atmospheric radioactive release.

  2. EAWAG: An Environmental Science and Engineering Resource.

    ERIC Educational Resources Information Center

    Miller, Stanton

    1980-01-01

    Interviewed is the director of a Swiss research and teaching institute in the field of water resources, water pollution control, and waste management. Topics include lake studies, research programs and priorities, advisory services, and the organizational structure of EAWAG. (BT)

  3. Integration of landslide susceptibility products in the environmental plans

    NASA Astrophysics Data System (ADS)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  4. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment... Fish and Wildlife Service Final Springfield Plateau Regional Restoration Plan and Environmental... the Final Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment...

  5. Active Sites Environmental Monitoring Program: Program plan

    SciTech Connect

    Ashwood, T.L.; Wickliff, D.S.; Morrissey, C.M.

    1992-02-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of transuranic (TRU) waste and active low-level waste (LLW) facilities at Oak Ridge National Laboratory (ORNL) in accordance with US Department of Energy (DOE) Order 5820.2A. Active LLW facilities in Solid Waste Storage Area (SWSA) 6 include Tumulus I and Tumulus II, the Interim Waste Management Facility (IWMF), LLW silos, high-range wells, asbestos silos, and fissile wells. The tumulus pads and IWMF are aboveground, high-strength concrete pads on which concrete vaults containing metal boxes of LLW are placed; the void space between the boxes and vaults is filled with grout. Eventually, these pads and vaults will be covered by an engineered multilayered cap. All other LLW facilities in SWSA 6 are below ground. In addition, this plan includes monitoring of the Hillcut Disposal Test Facility (HDTF) in SWSA 6, even though this facility was completed prior to the data of the DOE order. In SWSA 5 North, the TRU facilities include below-grade engineered caves, high-range wells, and unlined trenches. All samples from SWSA 6 are screened for alpha and beta activity, counted for gamma-emitting isotopes, and analyzed for tritium. In addition to these analytes, samples from SWSA 5 North are analyzed for specific transuranic elements.

  6. 78 FR 76852 - Notice of Intent To Prepare a Supplement to the Tri-County Draft Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM) Las Cruces District Office, Las Cruces, New Mexico, intends to prepare a Supplement to the Tri-County Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS), and by this......

  7. Waste Feed Delivery Environmental Permits and Approvals Plan

    SciTech Connect

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  8. Global Environmental Planning at the Technical University of Catalonia

    ERIC Educational Resources Information Center

    Ferrer-Balas, Didac

    2004-01-01

    In 1996 the Technical University of Catalonia (UPC) adopted an Environment Plan which incorporated classical technical education, promoting multidisciplinary environmental research, and improving the environmental performance of university life as a whole. This paper outlines the first environment plan (1996-2001). It discusses its encouraging…

  9. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  10. Natural resource management activities at the Savannah River Site. Environmental Assessment

    SciTech Connect

    Not Available

    1993-07-01

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  11. Saving Resources - Lesson plan of ESD in Geography

    NASA Astrophysics Data System (ADS)

    Iwamura, Takuya

    2010-05-01

    Geographical education has to perceive the world from diversified viewpoints by involving ESD (Education for Sustainable Development). This can be realized by teaching geography as an integrated science, including ESD that considers ecological, economic and social aspects.. In Japan especially, geographical education tends to emphasize the environmental aspects. The investigation of circumstances from diversified viewpoints helps to analyse the society scientifically and generates? the qualities of a global citizenship toward a sustainable society. And ESD aims at creating the values of sustainability, which is necessary for a global citizenship. In this context, I have developed the lesson plan of ESD in Geography at a secondary level.. Can advanced technologies foster sustainable development? The presentation shows the advanced technology-generated products and analyses the merits and failures with their effects on the global society. The examples of these products are hybrid cars and mobile phones. Cars are necessary for the mobility of our widespread modern society. On the other hand, it is also true that environmental pollution is becoming more serious by the increasing number of cars. We usually assume that economic development and environmental protection are contradictory. But hybrid cars which are coming to world attention now, have good gas mileage compared with normal cars, so they can conserve energy and cut down on the amount of exhaust at the same time. Mobile phones are necessary in business situations, as a tool that helps to communicate while moving. In addition, mobile phones are means that support the life of people living in sparsely populated areas like in Northern Europe. Here, we can curb costs for transmission facilities that were needed otherwise. There is one thing that underlies these advanced technology-generated products such as hybrid cars and mobile phones. The resource that makes the hybrid car technology and the miniaturization of

  12. MINING ENVIRONMENTAL TOXICOLOGY INFORMATION WEB RESOURCES

    EPA Science Inventory

    Environmental toxicology is the study of the ecological effects of anthropogenic substances released into the environment. It is a relatively diverse field addressing impacts to aquatic and terrestrial organisms and communities. The determination of potential risk associated with...

  13. Evaluating California local land use plan's environmental impact reports

    SciTech Connect

    Tang Zhenghong Bright, Elise; Brody, Samuel

    2009-02-15

    Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure.

  14. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    ERIC Educational Resources Information Center

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  15. Resource Planning in University Management by Goal Programming

    ERIC Educational Resources Information Center

    Schroeder, Roger G.

    1974-01-01

    Presents and illustrates a goal-programming model for long-range budget planning and resource allocation. Goals are faculty instruction loads, staff-to-faculty ratios, faculty distribution by rank, and teaching-assistant-to-faculty ratios. Decision variables are the faculty, staff, and teaching-assistant levels in each of several academic units.…

  16. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  17. From Training to Learning in Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  18. Factors Influencing Post-Adoptive Enterprise Resource Planning (ERP) Utilization

    ERIC Educational Resources Information Center

    McGinnis, Thomas C.

    2011-01-01

    Organizations expend a great deal of time, effort and money on the implementation of enterprise resource planning (ERP) systems. They are considered the price of entry for large organizations to do business. Yet the success rate of ERP systems is poor. IS literature suggests that one possible reason for this is the underutilization of these…

  19. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    ERIC Educational Resources Information Center

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  20. Ensuring Lessons Teach the Curriculum with a Lesson Plan Resource

    ERIC Educational Resources Information Center

    Craft, Heddi; Bland, Paul D.

    2004-01-01

    The Curriculum Leadership Institute (CLI) and classroom teachers working in conjunction with Emporia State University in Emporia, Kansas, developed the Lesson Plan Resource system. The CLI is a not-for-profit school consulting and publishing firm, also based in Emporia, Kansas, whose curriculum development model is used in over 1,000 schools in…

  1. Coordination and Human Resource Planning in the Hawaii Visitor Industry.

    ERIC Educational Resources Information Center

    Hawaii State Commission on Manpower and Full Employment, Honolulu.

    This report was undertaken in response to a request by the Sixth Legislature, which expressed its concern with the lack of coordination and overall human resource planning in the visitor industry and that the findings of the January 6-7, 1970 Travel Industry Congress had not been fully implemented. The State Commission on Manpower and Full…

  2. Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness

    ERIC Educational Resources Information Center

    Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna

    2011-01-01

    Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…

  3. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    SciTech Connect

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  4. [Evaluation of land resources carrying capacity of development zone based on planning environment impact assessment].

    PubMed

    Fu, Shi-Feng; Zhang, Ping; Jiang, Jin-Long

    2012-02-01

    Assessment of land resources carrying capacity is the key point of planning environment impact assessment and the main foundation to determine whether the planning could be implemented or not. With the help of the space analysis function of Geographic Information System, and selecting altitude, slope, land use type, distance from resident land, distance from main traffic roads, and distance from environmentally sensitive area as the sensitive factors, a comprehensive assessment on the ecological sensitivity and its spatial distribution in Zhangzhou Merchants Economic and Technological Development Zone, Fujian Province of East China was conducted, and the assessment results were combined with the planning land layout diagram for the ecological suitability analysis. In the Development Zone, 84.0% of resident land, 93.1% of industrial land, 86.0% of traffic land, and 76. 0% of other constructive lands in planning were located in insensitive and gently sensitive areas, and thus, the implement of the land use planning generally had little impact on the ecological environment, and the land resources in the planning area was able to meet the land use demand. The assessment of the population carrying capacity with ecological land as the limiting factor indicated that in considering the highly sensitive area and 60% of the moderately sensitive area as ecological land, the population within the Zone in the planning could reach 240000, and the available land area per capita could be 134.0 m2. Such a planned population scale is appropriate, according to the related standards of constructive land.

  5. Teachers Environmental Resource Unit: Energy and Power.

    ERIC Educational Resources Information Center

    Bemiss, Clair W.

    Problems associated with energy production and power are studied in this teacher's guide to better understand the impact of man's energy production on the environment, how he consumes energy, and in what quantities. The resource unit is intended to provide the teacher with basic information that will aid classroom review of these problems. Topics…

  6. Resource Requirements Planning for Hospitals Treating Serious Infectious Disease Cases.

    SciTech Connect

    Vugrin, Eric D.; Verzi, Stephen Joseph; Finley, Patrick D.; Turnquist, Mark A.; Wyte-Lake, Tamar; Griffin, Ann R.; Ricci, Karen J.; Plotinsky, Rachel

    2015-02-01

    This report presents a mathematical model of the way in which a hospital uses a variety of resources, utilities and consumables to provide care to a set of in-patients, and how that hospital might adapt to provide treatment to a few patients with a serious infectious disease, like the Ebola virus. The intended purpose of the model is to support requirements planning studies, so that hospitals may be better prepared for situations that are likely to strain their available resources. The current model is a prototype designed to present the basic structural elements of a requirements planning analysis. Some simple illustrati ve experiments establish the mo del's general capabilities. With additional inve stment in model enhancement a nd calibration, this prototype could be developed into a useful planning tool for ho spital administrators and health care policy makers.

  7. Critical Thinking for Natural Resource, Agricultural, and Environmental Ethics Education

    ERIC Educational Resources Information Center

    Quinn, Courtney; Burbach, Mark E.; Matkin, Gina S.; Flores, Kevin

    2009-01-01

    Future decision makers in natural resource fields will be required to make judgments on issues that lack clear solutions and with information complicated by ethical challenges. Therefore, natural resource, environmental, and agricultural professionals must possess the ability to think critically about the consequences of policy, economic systems,…

  8. SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

    NASA Technical Reports Server (NTRS)

    Thalman, Nancy E.; Sparn, Thomas P.

    1990-01-01

    SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

  9. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  10. Urbanization and Environmental Quality. Resource Papers for College Geography.

    ERIC Educational Resources Information Center

    Lakshmanan, T. R.; And Others

    The resource paper examines urban problems related to the environment. It is suitable for use in undergraduate or graduate courses in urban geography, economic development and environment, urban environment, and environmental policy analysis. The paper is organized in five chapters. The introduction traces the concern with environmental quality…

  11. In Pennsylvania, Department of Environmental Resources Leads Impact Statement Review

    ERIC Educational Resources Information Center

    Steigman, Harry

    1975-01-01

    Environmental impact statements are required for all projects undertaken by state agencies. Pennsylvania's Department of Environmental Resources issues permits for regulatory activities affecting the environment. Statements sent to a state clearinghouse are logged and reviewed. State Departments and regional clearinghouses review and comment…

  12. Human/Nature Discourse in Environmental Science Education Resources

    ERIC Educational Resources Information Center

    Chambers, Joan M.

    2008-01-01

    It is argued that the view of nature and the relationship between human beings and nature that each of us holds impacts our decisions, actions, and notions of environmental responsibility and consciousness. In this study, I investigate the discursive patterns of selected environmental science classroom resources produced by three disparate…

  13. WATER: Water Activities Teaching Environmental Responsibility: Teacher Resource, Environmental Science.

    ERIC Educational Resources Information Center

    Kramer, Ed, Ed.; And Others

    This activity book was developed as part of an effort to protect water quality of the Stillwater River, Ohio, through a Watershed Protection Project. It is designed to raise teachers' and students' awareness and trigger a sense of stewardship towards the preservation of water resources. The activities are generally appropriate for elementary age…

  14. [Environmental impact assessment based on planning support system].

    PubMed

    Chen, Wen-Bo; Carsjens, Gerrit-Jan

    2011-02-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based on Avenue, the secondary developing language of ArcView GIS. The system makes it convenient for planning practitioners exchanging information, and can spatially, visually and quantitatively describe environmental impact and its change. In this study, the urban-rural combination area located between EDE and Veenendaal of The Netherlands was taken as case, and the results indicated that the environment was incorporated well in the planning procedure based on the concepts, and could also demonstrate the effects of planning measures on environment spatially, explicitly, and in real-time, facilitating the participation of planning practitioners and decision-making. Some proposals of how to promote STEEP application in China were suggested.

  15. Disaster and Contingency Planning for Scientific Shared Resource Cores

    PubMed Central

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  16. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    PubMed

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  17. 10 CFR 719.16 - When must the staffing and resource plan be submitted?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Management Plan § 719.16 When must the staffing and resource plan be submitted? (a) For significant matters... matters, the contractor or Department retained counsel must submit the staffing and resource plan within... must submit updates to staffing and resource plans annually or sooner if significant changes occur...

  18. 10 CFR 719.16 - When must the staffing and resource plan be submitted?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Management Plan § 719.16 When must the staffing and resource plan be submitted? (a) For significant matters... matters, the contractor or Department retained counsel must submit the staffing and resource plan within... must submit updates to staffing and resource plans annually or sooner if significant changes occur...

  19. 10 CFR 719.16 - When must the staffing and resource plan be submitted?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Management Plan § 719.16 When must the staffing and resource plan be submitted? (a) For significant matters... matters, the contractor or Department retained counsel must submit the staffing and resource plan within... must submit updates to staffing and resource plans annually or sooner if significant changes occur...

  20. Scale and modeling issues in water resources planning

    USGS Publications Warehouse

    Lins, H.F.; Wolock, D.M.; McCabe, G.J.

    1997-01-01

    Resource planners and managers interested in utilizing climate model output as part of their operational activities immediately confront the dilemma of scale discordance. Their functional responsibilities cover relatively small geographical areas and necessarily require data of relatively high spatial resolution. Climate models cover a large geographical, i.e. global, domain and produce data at comparatively low spatial resolution. Although the scale differences between model output and planning input are large, several techniques have been developed for disaggregating climate model output to a scale appropriate for use in water resource planning and management applications. With techniques in hand to reduce the limitations imposed by scale discordance, water resource professionals must now confront a more fundamental constraint on the use of climate models-the inability to produce accurate representations and forecasts of regional climate. Given the current capabilities of climate models, and the likelihood that the uncertainty associated with long-term climate model forecasts will remain high for some years to come, the water resources planning community may find it impractical to utilize such forecasts operationally.

  1. Environmental resource management of the Munduruku savanna

    SciTech Connect

    Sheffler, E.M.; Southwick, E.E.

    1984-05-01

    For 13 years, the Munduruku were observed living in the savanna region located in South America in the Brazilian state of Para. The area is near the point where the states of Para, Amazonas, and Mato Grosso join their borders, and is utilized by about 200-300 Munduruku Amerindians. Their subsistence staple is manioc (a cassava), with fruits and meat included in the diet. Gold mining by Brazilians is a disruptive element in the resource management of the savanna habitat on the rim of the Amazon Basin. Direct and indirect results of mining interference are described. A study of the manner in which the Munduruku on the Cururu River (a tributary of the Tapajos) have handled the potentially disruptive rubber tapping suggests possible ways of reversing the interference. Several courses of action are discussed. 14 references, 3 figures, 2 tables.

  2. Environmental resource management on the Munduruku savanna

    NASA Astrophysics Data System (ADS)

    Sheffler, E. Margaret; Southwick, Edward E.

    1984-05-01

    For 13 years, the Munduruku were observed living in the savanna region located in South America in the Brazilian state of Pará. The area is near the point where the states of Pará, Amazonas, and Mato Grosso join their borders, and is utilized by about 200 300 Munduruku Amerindians. Their subsistence staple is manioc (a cassava), with fruits and meat included in the diet. Gold mining by Brazilians is a disruptive element in the resource management of the savanna habitat on the rim of the Amazon Basin. Direct and indirect results of mining interference are described. A study of the manner in which the Munduruku on the Cururu River (a tributary of the Tapajós) have handled the potentially disruptive rubber tapping suggests possible ways of reversing the interference. Several courses of action are discussed.

  3. Proposed resource evaluation plan. Salton Sea scientific drilling program

    SciTech Connect

    Not Available

    1985-03-01

    The report presents a plan for evaluating the deep geothermal resource in the Salton Sea area of Imperial County, California. The plan is divided into two testing programs, followed by the modeling and evaluation of the underground geothermal resource. The testing program related to geological data collection includes acquiring and analyzing the core, running geophysical and temperature/pressure logs in both the deep well and the injection well, and carrying out extensive mud-logging activities. The flow testing program includes temperature, pressure, and flow measurements made in the well and surface facilities. Sampling and analysis of fluid and scale both in the well and at the surface facilities will also be carried out. 6 refs., 7 figs., 7 tabs. (ACR)

  4. Systems Dynamic ToolBox for Water Resource Planning

    2006-08-01

    The Fully Integrated System Dynamics Tookbox for Water Resources Planning (Toolbox) is a library of generic modules intended to assist in water management planning and decision making in watersheds around the world. The modules - built in a commercially available modeling environment called Powersim Studio Expert, represent the different sub-systems ina watershed, including population, agriculture, economics, climate, reservoirs, stream flows, and fish populations, and provides generic building blocks with which complex models of complex modelsmore » of complex watersheds can be assembled. The resulting models provide a tool for observing how research management decision made in one sector of a basin can affect other sectors. Improved water resource management contributes to improved public health, economic development, ecological sustainability, and overall security and stability.« less

  5. Overview of the Environmental and Water Resources Institute's "Guidelines For Integrated Water Resources Management" Project

    SciTech Connect

    Gerald Sehlke

    2005-03-01

    Integrated Water Resources Management is a systematic approach to optimizing our understanding, control and management of water resources within a basin to meet multiple objectives. Recognition of the need for integrating water resources within basins is not unique to the Environmental and Water Resources Institute’s Integrated Water Resources Management Task Committee. Many individuals, governments and other organizations have attempted to develop holistic water resources management programs. In some cases, the results have been very effective and in other cases, valiant attempts have fallen far short of their initial goals. The intent of this Task Committee is to provide a set of guidelines that discusses the concepts, methods and tools necessary for integrating and optimizing the management of the physical resources and to optimize and integrate programs, organizations, infrastructure, and socioeconomic institutions into comprehensive water resources management programs.

  6. Interweaving Knowledge Resources to Address Complex Environmental Health Challenges

    PubMed Central

    Anderson, Beth Ellen; Suk, William A.

    2015-01-01

    Background Complex problems do not respect academic disciplinary boundaries. Environmental health research is complex and often moves beyond these boundaries, integrating diverse knowledge resources to solve such challenges. Here we describe an evolving paradigm for interweaving approaches that integrates widely diverse resources outside of traditional academic environments in full partnerships of mutual respect and understanding. We demonstrate that scientists, social scientists, and engineers can work with government agencies, industry, and communities to interweave their expertise into metaphorical knowledge fabrics to share understanding, resources, and enthusiasm. Objective Our goal is to acknowledge and validate how interweaving research approaches can contribute to research-driven, solution-oriented problem solving in environmental health, and to inspire more members of the environmental health community to consider this approach. Discussion The National Institutes of Health’s National Institute of Environmental Health Sciences Superfund Research Program (SRP), as mandated by Congress, has evolved to become a program that reaches across a wide range of knowledge resources. SRP fosters interweaving multiple knowledge resources to develop innovative multidirectional partnerships for research and training. Here we describe examples of how motivation, ideas, knowledge, and expertise from different people, institutions, and agencies can integrate to tackle challenges that can be as complex as the resources they bring to bear on it. Conclusions By providing structure for interweaving science with its stakeholders, we are better able to leverage resources, increase potential for innovation, and proactively ensure a more fully developed spectrum of beneficial outcomes of research investments. Citation Anderson BE, Naujokas MF, Suk WA. 2015. Interweaving knowledge resources to address complex environmental health challenges. Environ Health Perspect 123:1095–1099

  7. Planning for partnerships: Maximizing surge capacity resources through service learning.

    PubMed

    Adams, Lavonne M; Reams, Paula K; Canclini, Sharon B

    2015-01-01

    Infectious disease outbreaks and natural or human-caused disasters can strain the community's surge capacity through sudden demand on healthcare activities. Collaborative partnerships between communities and schools of nursing have the potential to maximize resource availability to meet community needs following a disaster. This article explores how communities can work with schools of nursing to enhance surge capacity through systems thinking, integrated planning, and cooperative efforts.

  8. Planning for partnerships: Maximizing surge capacity resources through service learning.

    PubMed

    Adams, Lavonne M; Reams, Paula K; Canclini, Sharon B

    2015-01-01

    Infectious disease outbreaks and natural or human-caused disasters can strain the community's surge capacity through sudden demand on healthcare activities. Collaborative partnerships between communities and schools of nursing have the potential to maximize resource availability to meet community needs following a disaster. This article explores how communities can work with schools of nursing to enhance surge capacity through systems thinking, integrated planning, and cooperative efforts. PMID:26750818

  9. Education for Environmental Planning and Conservation.

    ERIC Educational Resources Information Center

    Bandhu, Desh, Ed.; Ramanathan, N. L., Ed.

    Presented in these proceedings are the inaugural and presidential addresses, 8 keynote addresses, and 40 contributed papers presented at an international conference on environmental education (EE). Conference recommendations, a synopsis of conference themes/thrusts, resolution on the organization of a national environmental congress, and the Delhi…

  10. School Yard Environmental Projects: A Planning Primer.

    ERIC Educational Resources Information Center

    Megalos, Mark A.; And Others

    This guide describes how to establish successful trails, outdoor classrooms, or other environmental education improvements on rural and urban school grounds. Teachers are encouraged to promote the environmental project as a solution to an existing problem and to include all parties and stakeholders that can benefit from a coordinated environmental…

  11. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  12. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  13. Water Resources Council Proposed Principles and Standards for Planning Water and Related Land Resources. Notice of Public Review and Hearing.

    ERIC Educational Resources Information Center

    National Archives and Records Services (GSA), Washington, DC. Office of the Federal Register.

    Presented in this notice of a public review and hearing are the proposed Principles and Standards for planning water and related land resources of the United States. Developed by the Water Resources Council pursuant to the Water Resources Planning Act of 1965 (Public Law 89-80), the purpose is to achieve objectives, determined cooperatively,…

  14. 77 FR 56671 - Draft Shoreline Restoration Management Plan and Environmental Impact Statement for Indiana Dunes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... National Park Service Draft Shoreline Restoration Management Plan and Environmental Impact Statement for... Restoration Management Plan and Environmental Impact Statement, Indiana Dunes National Lakeshore, Indiana. DATES: The Draft Shoreline Restoration Management Plan and Environmental Impact Statement (SRMP) will...

  15. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... National Park Service Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement... Availability of the Draft Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan... Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan for Biscayne National Park,...

  16. Labor of love. A model for planning human resource needs.

    PubMed

    Brady, F J

    1989-01-01

    Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.

  17. Computing Bounds on Resource Levels for Flexible Plans

    NASA Technical Reports Server (NTRS)

    Muscvettola, Nicola; Rijsman, David

    2009-01-01

    A new algorithm efficiently computes the tightest exact bound on the levels of resources induced by a flexible activity plan (see figure). Tightness of bounds is extremely important for computations involved in planning because tight bounds can save potentially exponential amounts of search (through early backtracking and detection of solutions), relative to looser bounds. The bound computed by the new algorithm, denoted the resource-level envelope, constitutes the measure of maximum and minimum consumption of resources at any time for all fixed-time schedules in the flexible plan. At each time, the envelope guarantees that there are two fixed-time instantiations one that produces the minimum level and one that produces the maximum level. Therefore, the resource-level envelope is the tightest possible resource-level bound for a flexible plan because any tighter bound would exclude the contribution of at least one fixed-time schedule. If the resource- level envelope can be computed efficiently, one could substitute looser bounds that are currently used in the inner cores of constraint-posting scheduling algorithms, with the potential for great improvements in performance. What is needed to reduce the cost of computation is an algorithm, the measure of complexity of which is no greater than a low-degree polynomial in N (where N is the number of activities). The new algorithm satisfies this need. In this algorithm, the computation of resource-level envelopes is based on a novel combination of (1) the theory of shortest paths in the temporal-constraint network for the flexible plan and (2) the theory of maximum flows for a flow network derived from the temporal and resource constraints. The measure of asymptotic complexity of the algorithm is O(N O(maxflow(N)), where O(x) denotes an amount of computing time or a number of arithmetic operations proportional to a number of the order of x and O(maxflow(N)) is the measure of complexity (and thus of cost) of a maximumflow

  18. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  19. 36 CFR 223.113 - Modification of contracts to prevent environmental damage or to conform to forest plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TIMBER Timber Sale Contracts Contract Administration § 223.113 Modification of contracts to prevent environmental damage or to conform to forest plans. Timber sale contract, permits, and other such instruments... revisions of land and resource management plans adopted subsequent to award or issuance of a timber...

  20. Amarillo National Resource Center for Plutonium 1999 plan

    SciTech Connect

    1999-01-30

    The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage.

  1. President Jiang Zemin on family planning and environmental protection.

    PubMed

    Jiang, Z

    1997-04-01

    Presented in this brief article are excerpts of a speech given by the Chinese State President and Party Secretary-General Jiang Zemin at the National Forum on Family Planning and Environmental Protection on March 8, 1997. He states that family planning and environmental policies require long-term considerations. Both family planning and environmental matters are correlated and relate to socioeconomic development in China. Population growth will have negative impacts on the environment, and environmental mismanagement will adversely affect people's health and living conditions. The importance of environmental and family planning policies must be known to every household, and these policies must be effectively implemented as part of socioeconomic development programs. Although China's family planning policy has been successful in reducing China's population size and growth, the task ahead of guaranteeing a population under 1.3 billion by 2000 is enormous. The challenge will be to implement effective programs in rural and poverty-stricken areas. Family planning should be combined with poverty alleviation and income development. Policies should give priority to poor family planning acceptors. China has made "significant progress in environmental protection," but the public is creating "a higher demand on the quality of the environment." By the year 2000, the trends in environmental pollution and ecological destruction must be controlled and the quality of the environment improved. By 2010, there should be evidence of environmental improvements in urban areas, in degraded situations, and in rural areas. Environmental protection will require the cooperation between all departments, the Communist Party, and the Chinese people.

  2. EETAP Resource Library Information Sheets for Environmental Education Resources, Numbers 1-9.

    ERIC Educational Resources Information Center

    Heimlich, Joe E.; Daudi, Sabiha S.; Cummins, Hapi

    This series of nine information sheets was published by the Environmental Education and Training Partnership. The first six sheets describe the title topic, then provide a list of print resources indexed in ERIC and the Eisenhower National Clearinghouse for Mathematics and Science Education (ENC). Titles include: (1) "Environmental Education and…

  3. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  4. Environmental compliance considerations for the management of cultural resources

    SciTech Connect

    Curtis, S.A.; Whitfield, S.; McGinnis, K.

    1987-01-01

    This paper examines three key considerations underlying the programmatic management of cultural resources that may be affected by a large federal project. These considerations are statutory background and the compliance process, cultural resource compliance tasks, and quality assurance. The first consideration addresses the legal requirements and steps that must be met and taken for federal agencies to fulfill their cultural resource compliance responsibilities. The second consideration focuses on the tasks that must be performed by technical specialists to facilitate related federal and state compliance actions. The third consideration ensures that compliance requirements are being properly fulfilled. In the technical literature and compliance planning, archaeological and historic sites and Native American cultural resources are grouped under the general heading of cultural resources. Also included under this heading are the traditions and resources of Folk societies. Cultural resources encompass both material and nonmaterial aspects of our cultural heritage and include buildings, structures, objects, sites, districts, archaeological resources, places of religious importance, and unique, distinctive, or unusual lifeways. For compliance purposes, it is useful to treat these resources within four roughly chronological culture-historical periods: prehistoric, ethnohistoric, historic, and contemporary. 6 refs., 6 tabs.

  5. Balancing Cost and Risk: The Treatment of Renewable Energy inWestern Utility Resource Plans

    SciTech Connect

    Wiser, Ryan; Bolinger, Mark

    2005-09-01

    Markets for renewable electricity have grown significantly in recent years, motivated in part by federal tax incentives and in part by state renewables portfolio standards and renewable energy funds. State renewables portfolio standards, for example, motivated approximately 45% of the 4,300 MW of wind power installed in the U.S. from 2001 through 2004, while renewable energy funds supported an additional 15% of these installations. Despite the importance of these state policies, a less widely recognized driver for renewable energy market growth is poised to also play an important role in the coming years: utility integrated resource planning (IRP). Formal resource planning processes have re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, recent resource plans contemplate a significant amount of renewable energy additions. These planned additions - primarily coming from wind power - are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. The treatment of renewable energy in utility resource plans is not uniform, however. Assumptions about the direct and indirect costs of renewable resources, as well as resource availability, differ, as do approaches to incorporating such resources into the candidate portfolios that are analyzed in utility IRPs. The treatment of natural gas price risk, as well as the risk of future environmental regulations, also varies substantially. How utilities balance expected portfolio cost versus risk in selecting a preferred portfolio also differs. Each of these variables may have a substantial effect on the degree to which renewable energy contributes to the preferred portfolio of each utility IRP. This article

  6. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    SciTech Connect

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-11-15

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  7. Environmental and Planning Studies at the University of Illinois.

    ERIC Educational Resources Information Center

    Findley, Roger W.

    1979-01-01

    The University of Illinois College of Law has developed a program in environmental and planning studies that includes interdisciplinary instruction, student internships, interdisciplinary and international research by faculty and graduate fellows, and a strong public service element with close ties to state environmental agencies. (JMD)

  8. Guide for Planning a High School Environmental Action Conference.

    ERIC Educational Resources Information Center

    Wanless, Angie, Comp.; And Others

    The purpose of this manual is to provide guidelines and suggestions for people organizing an environmental action conference for high school students. The format and planning suggestions are based on the methods used for a conference organized by the Wisconsin Center for Environmental Education in 1991. The bulk of the manual provides structure…

  9. Modern Lesson Plans in Environmental Science.

    ERIC Educational Resources Information Center

    Kotsonis, Helen Hoch; Baker, Bill

    This sourcebook, developed for teachers of ecology, biology, general science and hygiene, contains 27 lesson plans that have been organized into 5 units. The units are: The Dynamics of Pollution, Conservation and the Environment, Biological Controls and their Relationship to the Environment, Urban Ecology, and Environment and Health. The lesson…

  10. Integrating human resources and program-planning strategies.

    PubMed

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  11. Planned Environmental Microbiology Aspects of Future Lunar and Mars Missions

    NASA Technical Reports Server (NTRS)

    Ott, C. Mark; Castro, Victoria A.; Pierson, Duane L.

    2006-01-01

    With the establishment of the Constellation Program, NASA has initiated efforts designed similar to the Apollo Program to return to the moon and subsequently travel to Mars. Early lunar sorties will take 4 crewmembers to the moon for 4 to 7 days. Later missions will increase in duration up to 6 months as a lunar habitat is constructed. These missions and vehicle designs are the forerunners of further missions destined for human exploration of Mars. Throughout the planning and design process, lessons learned from the International Space Station (ISS) and past programs will be implemented toward future exploration goals. The standards and requirements for these missions will vary depending on life support systems, mission duration, crew activities, and payloads. From a microbiological perspective, preventative measures will remain the primary techniques to mitigate microbial risk. Thus, most of the effort will focus on stringent preflight monitoring requirements and engineering controls designed into the vehicle, such as HEPA air filters. Due to volume constraints in the CEV, in-flight monitoring will be limited for short-duration missions to the measurement of biocide concentration for water potability. Once long-duration habitation begins on the lunar surface, a more extensive environmental monitoring plan will be initiated. However, limited in-flight volume constraints and the inability to return samples to Earth will increase the need for crew capabilities in determining the nature of contamination problems and method of remediation. In addition, limited shelf life of current monitoring hardware consumables and limited capabilities to dispose of biohazardous trash will drive flight hardware toward non-culture based methodologies, such as hardware that rapidly distinguishes biotic versus abiotic surface contamination. As missions progress to Mars, environmental systems will depend heavily on regeneration of air and water and biological waste remediation and

  12. 75 FR 49514 - Notice of Availability for the Little Snake Proposed Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... multiple resource use in the planning area by protecting sensitive resources, including high priority... mineral estate. The Little Snake Field Office area is currently being managed under its 1989 RMP, which... planning area. Alternative B would allow the greatest extent of resource use within the planning...

  13. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect

    Not Available

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  14. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  15. Environmentally sound irrigated agriculture in the arid west: New challenges for water resources planners and environmental scientists

    SciTech Connect

    Quinn, N.W.T.

    1991-04-01

    This is an exciting time for water resources planners and environmental scientists in the State and Federal Agencies in California. The growing environmental awareness of the public has raised their interest in the manner by which water is managed and allocated. Current and future impending water shortages are challenging engineers and planners to make sound policy and system operations decisions to maximize the utility of scarce water resources while ensuring that the environment within which we live is adequately protected to the satisfaction of an informed public. New and innovative decision support systems are needed to meet these challenges that are flexible, comprehensible and accurate and which allow the public a more visible role in the planning process. These changes may help to bring the agricultural and environmental communities closer together in finding solutions to water resources problems and wrest policy making for water resources management out of the hands of lawyers and the courts and restore it to those whose livelihoods are affected by the intentions of these policies. 4 refs.

  16. In Brief: Environmental Protection Agency releases strategic plan

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-10-01

    Five grand strategic goals are the centerpiece of a strategic plan released on 30 September by the U.S. Environmental Protection Agency (EPA). The plan for fiscal years 2011-2015 outlines goals including taking action on climate change and improving air quality, protecting America's waters, cleaning up communities and advancing sustainable development, ensuring the safety of chemicals and preventing pollution, and enforcing environmental laws. “We will continue to affirm the core values of science, transparency, and the rule of law in addressing these priorities. These are the most urgent issues we must confront through 2015,” EPA administrator Lisa Jackson wrote in the plan. For more information, visit http://www.epa.gov/ocfo/plan/2015/FY2011_2015_EPA_Strategic_Plan.pdf.

  17. 78 FR 18562 - Economic and Environmental Principles and Guidelines for Water and Related Land Resources...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... QUALITY Economic and Environmental Principles and Guidelines for Water and Related Land Resources... Quality. ACTION: Draft guidelines with request for comments. SUMMARY: Section 2031 of the Water Resources... Environmental Principles and Guidelines for Water and Related Land Resources Implementation...

  18. Directory of country environmental studies, 1993. An annotated bibliography of environmental and natural resource profiles and assessments

    SciTech Connect

    Tunstall, D.B.; van der Wansem, M.

    1992-11-01

    The 1993 edition of the Directory provides detailed citations and abstracts for 357 major natural resource and environmental studies (257 of which were added since the 1990 edition) covering 129 developing countries and 12 regional groupings. Most of the studies (93%) were prepared between 1987 and 1992. Included are 66 national reports prepared for the U.N. Conference on Environment and Development, held in Rio de Janeiro in June 1992. Thirty-three countries, including Algeria, Bhutan, Cuba, Republic of Korea, Laos, Namibia, South Africa, Suriname, Taiwan, and Venezuela, are new to this edition of the directory, which focuses on reports that link quantitative assessment of a country's natural resources to economic development and the maintenance of ecosystems, with particular emphasis on natural resource management strategies and action plans.

  19. Resource conservation program in terms of Vostokgazprom environmental policy

    NASA Astrophysics Data System (ADS)

    Tsibulnikova, M. R.; Nadyumov, S. V.; Adam, A. M.; Korotchenko, T. V.

    2016-09-01

    The article examines a number of key areas of environmental policy of Vostokgazprom. The Associated Petroleum Gas program is an important step within the resource conservation and environmental protection framework. In addition, the company undertakes the extensive work on emergency response programs, and carries out continuous protection of the subsurface and control over environmental safety in all production sites. Vostokgazprom continuously modernizes the basic industrial facilities and invests money in new projects. The study analyzes the steps being taken by the company within the energy saving policy that leads to significant costs cut.

  20. Environmental education work force pipeline strategic plan

    SciTech Connect

    Ortega, S.U.; Jackson, E.R.

    1992-11-01

    This document describes an educational program designed to provide a pool of highly qualified administrative, technical, and managerial graduates that are familiar with the Hanford Site and business operations. The program is designed to provide work experience and mentoring to a culturally diverse student base which enhances affirmative employment goals. Short-term and long-term objectives of the program are outlined in the report, and current objectives are discussed in more detail. Goals to be completed by the year 2003 are aimed at defining the criteria necessary to establish partnerships between schools, community organizations, and human resources departments. Actions to be implemented includes providing instructors and equipment, enhancing skills of local teachers, and establishing collaboration with human resources organizations. Long-term goals of the program are to ensure a constant supply of qualified, trained workers to support industry missions. 6 refs., 1 tab.

  1. Environmental Research In Practice: Restoration And Protection Of Water Resources

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) is tasked to protect human health and the environment. To carry out this task, the EPA makes use of technical expertise within its Office of Research and Development. Restoration and protection of water resources is one area of tec...

  2. Industrial Arts and Environmental Education. A Resource Guide.

    ERIC Educational Resources Information Center

    Figurski, Arthur J.

    Prepared as a result of the author's concern for the role of industrial arts, and in conjunction with the Oswego Industrial Arts Technology Staff Development Program, this resource guide should help the industrial arts teacher integrate environmental education concepts into existing curriculum. It seeks to increase the teacher's awareness of some…

  3. Directory of Ohio Environmental Education Sites and Resources, 2002.

    ERIC Educational Resources Information Center

    Mourad, Teresa; Watkins, Carolyn

    This directory, organized by region, lists sites and resources for environmental education programs in Ohio, including details of the programs, the services they offer, and the audiences they serve. The directory also includes details related to arboretums and gardens, camps, nature centers and preserves, museums, parks, zoos, environmental…

  4. Environmental/Natural Resources Technologies. State Competency Profile.

    ERIC Educational Resources Information Center

    Kershaw, Isaac; Mazak, Sara A.; Spence, Janet G.

    This document, which lists the environmental and natural resources technology competencies identified by representatives from businesses and industries as well as secondary and postsecondary educators throughout Ohio, is intended to assist individuals and organizations in developing college tech prep programs that will prepare students from…

  5. Natural Resources. Environmental Education Instructional Unit. Final Edition.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Science Education.

    This unit on natural resources is one in a series of three prepared for use in the classroom. An interdisciplinary approach encompassing mathematics, science, and social studies is utilized in these environmental units. This material is designed for middle grades and above. Many of the activities are open-ended with each activity in this unit…

  6. A resource oriented webs service for environmental modeling

    NASA Astrophysics Data System (ADS)

    Ferencik, Ioan

    2013-04-01

    Environmental modeling is a largely adopted practice in the study of natural phenomena. Environmental models can be difficult to build and use and thus sharing them within the community is an important aspect. The most common approach to share a model is to expose it as a web service. In practice the interaction with this web service is cumbersome due to lack of standardized contract and the complexity of the model being exposed. In this work we investigate the use of a resource oriented approach in exposing environmental models as web services. We view a model as a layered resource build atop the object concept from Object Oriented Programming, augmented with persistence capabilities provided by an embedded object database to keep track of its state and implementing the four basic principles of resource oriented architectures: addressability, statelessness, representation and uniform interface. For implementation we use exclusively open source software: Django framework, dyBase object oriented database and Python programming language. We developed a generic framework of resources structured into a hierarchy of types and consequently extended this typology with recurses specific to the domain of environmental modeling. To test our web service we used cURL, a robust command-line based web client.

  7. Selected Resources for Environmental Education 1969-1971.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul.

    This is a listing of selected resources for environmental education for all grade levels. Complete bibliographical information is given, including price, grade level, and a one-sentence description of the entry. Entries are organized according to the following subject headings: Children's Books, Books for Young Adults and Periodicals. The last…

  8. Environmental issues relevant to the preparation of USAID/Mozambique`s country program strategic plan

    SciTech Connect

    1994-01-01

    The present moment offers a unique opportunity to address Mozambique`s environmental problems, according to this assessment of Mozambique`s natural and environmental resources. Conducted to help USAID/M prepare its Country Program Strategic Plan (CPSP), the assessment covers: (1) the status of Mozambique`s natural resources (soil and land, water, vegetative cover, wildlife/biodiversity and nonrenewable resources), with emphasis on conservation and management of biological diversity and tropical forests; (2) shortcomings in the knowledge and management of these resources; (3) the efforts of other donors and NGOs to address natural resources degradation; and (4) recommendations. According to the report, while all three of the CPSP`s focus areas -- income generation, social services, the democratic governance -- can contribute notably to sustainable use of the environment, the income focus will have the most impact, as families who are struggling to survive often turn to destructive patterns of land use. The report cautions USAID/M not to neglect, in its emphasis on NGOs, the state agencies that will be responsible for guaranteeing security in areas such as land rights. In particular, the Mission should promote the policymaking and enforcement role of the National Commission for the Environment (CNA) and should involve the CNA in Mission environmental assessments. Appendices include a summary of donor environmental activities in Mozambique; a tabulated portrait of Mozambique`s forest resources and forestry sector; and a list of state agencies with responsibilities in Mozambique`s coastal zone.

  9. 2006 Long Range Development Plan Final Environmental ImpactReport

    SciTech Connect

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,' or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for

  10. ORNL long-range environmental and waste management plan: Program overview and summary

    SciTech Connect

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.; du Mont, S.P.; Easterday, C.A.; Geisler, A.H.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Pudelek, R.E.; Rohwer, P.S.; Scanlan, T.F.; Stratton, L.E.; Trabalka, J.R.; Youngblood, E.L.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs.

  11. 76 FR 41814 - Notice of Intent To Prepare an Amendment to the 1985 Wells Resource Management Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... is completed and a record of decision is issued (71 FR 77:20725, April 21, 2006). The BLM is also... Spruce Mountain Area and Associated Environmental Assessment, Nevada AGENCY: Bureau of Land Management... Resource Management Plan (RMP) for recreation in the Spruce Mountain Area and prepare an...

  12. 78 FR 25299 - Notice of Intent To Prepare a Resource Management Plan for the San Pedro Riparian National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... Bureau of Land Management Notice of Intent To Prepare a Resource Management Plan for the San Pedro... of Land Management, Interior. ACTION: Notice of intent. SUMMARY: In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, the Federal Land Policy and Management Act of 1976...

  13. Integrated system dynamics toolbox for water resources planning.

    SciTech Connect

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David; Chemak, Janie; Cockerill, Kristan; Aragon, Carlos , Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining , Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining , Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.

  14. Program Risk Planning with Risk as a Resource

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    1998-01-01

    The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

  15. ERP (enterprise resource planning) systems can streamline healthcare business functions.

    PubMed

    Jenkins, E K; Christenson, E

    2001-05-01

    Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making. PMID:11351810

  16. Improving productivity and firm performance with enterprise resource planning

    NASA Astrophysics Data System (ADS)

    Beheshti, Hooshang M.; Beheshti, Cyrus M.

    2010-11-01

    Productivity is generally considered to be the efficient utilisation of organisational resources and is measured in terms of the efficiency of a worker, company or nation. Focusing on efficiency alone, however, can be harmful to the organisation's long-term success and competitiveness. The full benefits of productivity improvement measures are realised when productivity is examined from two perspectives: operational efficiency (output/input) of an individual worker or a business unit as well as performance (effectiveness) with regard to end user or customer satisfaction. Over the years, corporations have adopted new technology to integrate business activities in order to achieve both effectiveness and efficiency in their operations. In recent years, many firms have invested in enterprise resource planning (ERP) in order to integrate all business activities into a uniform system. The implementation of ERP enables the firm to reduce the transaction costs of the business and improve its productivity, customer satisfaction and profitability.

  17. Strategic environmental assessment of development plans in Great Britain

    SciTech Connect

    Therivel, R.

    1998-01-01

    Although Britain has no legislation regarding strategic environmental assessment (SEA), SEA guidance exists and various forms of SEA are carried out: environmental appraisals of development plans, environmental profiles of European Structural Fund applications, ad hoc SEAs for specific sectors, and SEAs for Cabinet decisions. These are characterized by their qualitative approach, relative brevity, and low cost. This article begins by reviewing British SEA guidelines. The status of environmental appraisal of development plans is discussed in more detail, based on a series of questionnaires of all UK local authorities that queried: the current stage of their appraisal, who carried it out, what techniques were used, and what were thought to be the costs and benefits of environmental appraisal, and advice on carrying out an appraisal. The article concludes with a brief discussion of the benefits and limitations of Britain`s streamlined form of SEA.

  18. EG and G Idaho Environmental Protection Implementation Plan (1990)

    SciTech Connect

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  19. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    SciTech Connect

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments.

  20. The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

    NASA Technical Reports Server (NTRS)

    Morris, D. G.; Burke, E. S.

    2002-01-01

    The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

  1. Utility of stochastic decadal simulations in water resource planning (Invited)

    NASA Astrophysics Data System (ADS)

    Greene, A. M.; Goddard, L. M.; Gonzalez, P. L.

    2010-12-01

    State-of-the-art decadal forecasts from initialized general circulation models (GCMs) are examined in several regional settings, in the context of water resource planning. A strategy is then discussed for providing useful information on decadal time scales, even in the absence of skillful GCM-based predictions. This information takes the form of an ensemble of stochastic simulations. Desirable properties of such ensembles are considered and several generative methods compared. A detailed application to the Berg River watershed, Western Cape province, South Africa is provided.

  2. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  3. [Human resources planning: the use of demographic-economic models].

    PubMed

    Daubon, R E

    1980-01-01

    This article provides an overview of the evolution of employment at different stages of economic development and describes the employment situation in developing countries, suggesting future trends and means of improvement. The lack of authentic development is reflected in the problem of employment of both natural and human resources in Third World countries. Their occupational structures may be examined in 2 periods, 1 in which a certain pretransitional equilibrium was still observed, and the other following the beginning of industrialization. With increased population growth and the application of development strategies favoring urban areas and manufacturing, a series of imbalances were introduced which had as 1 consequence an ever widening income gap between rural areas, cities, and developed countries. Rural stagnation and population pressure ultimately led to massive urban migration in many areas, swelling the cities and creating an "informal sector" of underemployed persons in marginal activities of low productivity. By 2050, the world labor force will have increased from its present 1.7 billion workers to 3.8 billion, of which only 660 million will be in presently developed countries. Each country must plan the best use of its human resources, and must include employment planning in overall development planning. The development of economic-demographic models, adapted to the context of each country, can be a valuable tool in planning. Various types of economic-demographic models and their uses are described and differentiated. Economic-demographic models of employment have 3 main parts, demography, economy, and training. Their use in the analysis of the impact of specific variables on employment, of policies, and of general strategies is described. Finally, the characteristics and uses of MODEMP, an economic-demographic model created for analysis of labor force and employment problems in Peru, are described. PMID:12265325

  4. Impacts of Demand-Side Resources on Electric Transmission Planning

    SciTech Connect

    Hadley, Stanton W.; Sanstad, Alan H.

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  5. Environmental concerns drive project planning and design

    SciTech Connect

    Hamilton, G.M.

    1994-01-01

    This paper describes the measures used to retrofit and requalify a Northwest Pipeline Corp., pipeline near Seattle, Washington. The pipeline is a 26 inch transmission line which has lost operating pressure because of the growth in Seattle`s population. The pipeline was redesigned to requalify to a maximum pressure of 809 pounds per square inch. The paper describes the environmental issues faced during the construction and reconstruction efforts to protect wetlands and dispose of pipeline wastes. It describes the methods for cleaning the inside of the pipelines using various chemicals and cleaning tools.

  6. Environmental Release Prevention and Control Plan

    SciTech Connect

    Mamatey, A.; Arnett, M.

    1997-10-01

    During the history of SRS, continual improvements in facilities, process, and operations, and changes in the site`s mission have reduced the amount of radioactive liquid releases. In the early years of SRS (1958 to 1965), the amount of tritium discharged to the Savannah River averaged approximately 61,000 curies a year. During the mid-1980`s (1983 to 1988), liquid releases of tritium averaged 27,000 curies a year. By 1996, liquid releases of tritium are projected to be just 3000 curies for the year. This large projected decrease is the result of the planned shut-down of all reactors and the anticipated significant decline in the amount of tritium migrating from the site seepage basins and the Solid Waste Disposal Facility.

  7. Natural Resource Extraction, Armed Violence, and Environmental Degradation

    PubMed Central

    Downey, Liam; Bonds, Eric; Clark, Katherine

    2011-01-01

    The goal of this article is to demonstrate that environmental sociologists cannot fully explain the relationship between humans and the natural world without theorizing a link between natural resource extraction, armed violence, and environmental degradation. The authors begin by arguing that armed violence is one of several overlapping mechanisms that provide powerful actors with the means to (a) prevail over others in conflicts over natural resources and (b) ensure that natural resources critical to industrial production and state power continue to be extracted and sold in sufficient quantities to promote capital accumulation, state power, and ecological unequal exchange. The authors then identify 10 minerals that are critical to the functioning of the U.S. economy and/or military and demonstrate that the extraction of these minerals often involves the use of armed violence. They further demonstrate that armed violence is associated with the activities of the world’s three largest mining companies, with African mines that receive World Bank funding, and with petroleum and rainforest timber extraction. The authors conclude that the natural resource base on which industrial societies stand is constructed in large part through the use and threatened use of armed violence. As a result, armed violence plays a critical role in fostering environmental degradation and ecological unequal exchange. PMID:21909231

  8. Ground-water models for water resource planning

    USGS Publications Warehouse

    Moore, J.E.

    1983-01-01

    In the past decade hydrogeologists have emphasized the development of computer-based mathematical models to aid in the understanding of flow, the transport of solutes, transport of heat, and deformation in the ground-water system. These models have been used to provide information and predictions for water managers. Too frequently, ground-water was neglected in water resource planning because managers believed that it could not be adequately evaluated in terms of availability, quality, and effect of development on surface-water supplies. Now, however, with newly developed digital ground-water models, effects of development can be predicted. Such models have been used to predict hydrologic and quality changes under different stresses. These models have grown in complexity over the last ten years from simple one-layer models to three-dimensional simulations of ground-water flow, which may include solute transport, heat transport, effects of land subsidence, and encroachment of saltwater. Case histories illustrate how predictive ground-water models have provided the information needed for the sound planning and management of water resources in the USA. ?? 1983 D. Reidel Publishing Company.

  9. Ground-water models for water resources planning

    USGS Publications Warehouse

    Moore, John E.

    1980-01-01

    In the past decade hydrologists have emphasized the development of computer-based mathematical models to aid in the understanding of flow, the transport of solutes, transport of heat, and deformation in the groundwater system. These models have been used to provide information and predictions for water managers. Too frequently, groundwater was neglected in water-resource planning because managers believed that it could not be adequately evaluated in terms of availability, quality, and effect of development on surface water supplies. Now, however, with newly developed digital groundwater models, effects of development can be predicted. Such models have been used to predict hydrologic and quality changes under different stresses. These models have grown in complexity over the last 10 years from simple one-layer flow models to three-dimensional simulations of groundwater flow which may include solute transport, heat transport, effects of land subsidence, and encroachment of salt water. This paper illustrates, through case histories, how predictive groundwater models have provided the information needed for the sound planning and management of water resources in the United States. (USGS)

  10. Puerto Rico water resources planning model program description

    USGS Publications Warehouse

    Moody, D.W.; Maddock, Thomas; Karlinger, M.R.; Lloyd, J.J.

    1973-01-01

    Because the use of the Mathematical Programming System -Extended (MPSX) to solve large linear and mixed integer programs requires the preparation of many input data cards, a matrix generator program to produce the MPSX input data from a much more limited set of data may expedite the use of the mixed integer programming optimization technique. The Model Definition and Control Program (MODCQP) is intended to assist a planner in preparing MPSX input data for the Puerto Rico Water Resources Planning Model. The model utilizes a mixed-integer mathematical program to identify a minimum present cost set of water resources projects (diversions, reservoirs, ground-water fields, desalinization plants, water treatment plants, and inter-basin transfers of water) which will meet a set of future water demands and to determine their sequence of construction. While MODCOP was specifically written to generate MPSX input data for the planning model described in this report, the program can be easily modified to reflect changes in the model's mathematical structure.

  11. A consolidated environmental monitoring plan for Aberdeen Proving Ground, Maryland

    SciTech Connect

    Ebinger, M.H.; Hansen, W.R.

    1997-04-01

    The US Army operates facilities in Edgewood and Aberdeen under several licenses from the Nuclear Regulatory Commission (NRC). Compliance with each license is time consuming and could potentially result in duplicated efforts to demonstrate compliance with existing environmental regulations. The goal of the ERM plan is to provide the sampling necessary to ensure that operations at Edgewood and Aberdeen are within applicable regulatory guidelines and to provide a means of ensuring that adverse effects to the environment are minimized. Existing sampling plans and environmental data generated from those plans are briefly reviewed as part of the development of the present ERM plan. The new ERM plan was designed to provide data that can be used for assessing risks to the environment and to humans using Aberdeen and Edgewood areas. Existing sampling is modified and new sampling is proposed based on the results of the long-term DU fate study. In that study, different environmental pathways were identified that would show transport of DU at Aberdeen. Those pathways would also be impacted by other radioactive constituents from Aberdeen and Edgewood areas. The ERM plan presented in this document includes sampling from Edgewood and Aberdeen facilities. The main radioactive constituents of concern at Edgewood are C, P, N, S, H, I, Co, Cs, Ca, Sr and U that are used in radiolabeling different compounds and tracers for different reactions and syntheses. Air and water sampling are the thrust of efforts at the Edgewood area.

  12. Earth observation for regional scale environmental and natural resources management

    NASA Astrophysics Data System (ADS)

    Bernknopf, R.; Brookshire, D.; Faulkner, S.; Chivoiu, B.; Bridge, B.; Broadbent, C.

    2013-12-01

    Earth observations (EO) provide critical information to natural resource assessment. Three examples are presented: conserving potable groundwater in intense agricultural regions, maximizing ecosystem service benefits at regional scales from afforestation investment and management, and enabling integrated natural and behavioral sciences for resource management and policy analysis. In each of these cases EO of different resolutions are used in different ways to help in the classification, characterization, and availability of natural resources and ecosystem services. To inform decisions, each example includes a spatiotemporal economic model to optimize the net societal benefits of resource development and exploitation. 1) EO is used for monitoring land use in intensively cultivated agricultural regions. Archival imagery is coupled to a hydrogeological process model to evaluate the tradeoff between agrochemical use and retention of potable groundwater. EO is used to couple individual producers and regional resource managers using information from markets and natural systems to aid in the objective of maximizing agricultural production and maintaining groundwater quality. The contribution of EO is input to a nitrate loading and transport model to estimate the cumulative impact on groundwater at specified distances from specific sites (wells) for 35 Iowa counties and two aquifers. 2) Land use/land cover (LULC) derived from EO is used to compare biological carbon sequestration alternatives and their provisioning of ecosystem services. EO is used to target land attributes that are more or less desirable for enhancing ecosystem services in two parishes in Louisiana. Ecological production functions are coupled with value data to maximize the expected return on investment in carbon sequestration and other ancillary ecosystem services while minimizing the risk. 3) Environmental and natural resources management decisions employ probabilistic estimates of yet-to-find or yet

  13. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    SciTech Connect

    Thompson, Sharon D.

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  14. TWRS phase I privatization site environmental baseline and characterization plan

    SciTech Connect

    Shade, J.W.

    1997-09-01

    This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

  15. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning... known or suspected environmental contamination. (5) (6) Policy—planning—management—capacity...

  16. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities....

  17. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities....

  18. Environmental Restoration Strategic Plan. Remediating the nuclear weapons complex

    SciTech Connect

    1995-08-01

    With the end of the cold war, the US has a reduced need for nuclear weapons production. In response, the Department of Energy has redirected resources from weapons production to weapons dismantlement and environmental remediation. To this end, in November 1989, the US Department of Energy (DOE) established the Office of Environmental Restoration and Waste Management (renamed the Office of Environmental Management in 1994). It was created to bring under a central authority the management of radioactive and hazardous wastes at DOE sites and inactive or shut down facilities. The Environmental Restoration Program, a major component of DOE`s Environmental Management Program, is responsible for the remediation and management of contaminated environmental media (e.g., soil, groundwater, sediments) and the decommissioning of facilities and structures at 130 sites in over 30 states and territories.

  19. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    SciTech Connect

    Not Available

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  20. Comparing Public and Private Institutions That Have and Have Not Implemented Enterprise Resource Planning (ERP) Systems: A Resource Dependence Perspective

    ERIC Educational Resources Information Center

    Sendhil, Geetha R.

    2012-01-01

    The purpose of this national study was to utilize quantitative methods to examine institutional characteristics, financial resource variables, personnel variables, and customer variables of public and private institutions that have and have not implemented enterprise resource planning (ERP) systems, from a resource dependence perspective.…

  1. Planning for Water Resources of South Florida: A system dynamics modeling approach

    NASA Astrophysics Data System (ADS)

    Ahmad, S.

    2006-12-01

    With enormous growth in population, changes in land use, substantial agriculture activity, and need to protect vital environmental resources such as Everglades, south Florida presents a very challenging case for water resources planning. Working with stakeholders to meet challenges of water resources planning in south Florida, we are exploring important questions: (a) What are some major changes in terms of population growth, land use, water demand, and water availability that can be expected in south Florida in the short and long term?; (b) What would be the major hydrologic effects of climate variability and change on south Florida's water system?; (c) How could Florida's water system adapt to anticipated population growth, urban sprawl, and climate change?; and (d) What are the most promising (cost effective) policies for south Florida's water management in response to growth and climate change? We are developing a decision support (DS) framework, using system dynamics modeling approach, to evaluate and compare different short and long term water management policies. Besides climate information, the integrated DS framework considers other major factors that influence water demand and availability including: demographic changes, land use changes, economy, and environment. We analyze how increased or better use of climate information can lead to better, more cost-effective decisions for sustainable management of water resources. Using games/scenarios involving decision makers, we evaluate cost-effectiveness of different policy choices for short and long term water management in the region. We evaluate policies based on both demand side management through efficiency and conservation (low flow appliances, xeriscaping, pricing) and supply side management (desalination, water reuse). The outcome is a framework for exploring cost-effectiveness of alternative water management policies. The research advances work on water resources planning considering the impacts of

  2. Information technologies for global resources management and environmental assessment

    SciTech Connect

    Campbell, A.P.; Wang, Hua

    1992-09-01

    Recent advances in computer and communications technologies offer unprecedented opportunities to develop sophisticated information resources management systems for global resources management and environment assessment in an efficient, effective, and systematic manner. In this paper, the emerging global energy and environmental issues are identified. Since satellite-based remote sensing systems are becoming increasingly available and produce massive data collections, the utilization of imaging processing techniques and their applications for regional and global resources management and environmental studies are described. Interoperability and interconnectivity among heterogeneous computer systems are major issues in designing a totally integrated, multimedia-based, information resources management system that operates in a networking environment. Discussions of the future technology trends are focused on a number of emerging information management technologies and communications standards which will aid in achieving seamless system integration and offer user-friendly operations. It can be foreseen that advances in computer and communications technologies, increasingly sophisticated image processing techniques and Geographical Information Systems (GIS), and the development of globally comprehensive data bases will bring ``global visualization`` onto multimedia desktop computers before the end of this decade.

  3. Information technologies for global resources management and environmental assessment

    SciTech Connect

    Campbell, A.P.; Wang, Hua.

    1992-01-01

    Recent advances in computer and communications technologies offer unprecedented opportunities to develop sophisticated information resources management systems for global resources management and environment assessment in an efficient, effective, and systematic manner. In this paper, the emerging global energy and environmental issues are identified. Since satellite-based remote sensing systems are becoming increasingly available and produce massive data collections, the utilization of imaging processing techniques and their applications for regional and global resources management and environmental studies are described. Interoperability and interconnectivity among heterogeneous computer systems are major issues in designing a totally integrated, multimedia-based, information resources management system that operates in a networking environment. Discussions of the future technology trends are focused on a number of emerging information management technologies and communications standards which will aid in achieving seamless system integration and offer user-friendly operations. It can be foreseen that advances in computer and communications technologies, increasingly sophisticated image processing techniques and Geographical Information Systems (GIS), and the development of globally comprehensive data bases will bring global visualization'' onto multimedia desktop computers before the end of this decade.

  4. Predicting People's Environmental Behaviour: Theory of Planned Behaviour and Model of Responsible Environmental Behaviour

    ERIC Educational Resources Information Center

    Chao, Yu-Long

    2012-01-01

    Using different measures of self-reported and other-reported environmental behaviour (EB), two important theoretical models explaining EB--Hines, Hungerford and Tomera's model of responsible environmental behaviour (REB) and Ajzen's theory of planned behaviour (TPB)--were compared regarding the fit between model and data, predictive ability,…

  5. The ESRC: A Web-based Environmental Satellite Resource Center

    NASA Astrophysics Data System (ADS)

    Abshire, W. E.; Guarente, B.; Dills, P. N.

    2009-12-01

    The COMET® Program has developed an Environmental Satellite Resource Center (known as the ESRC), a searchable, database-driven Website that provides easy access to a wide range of useful information training materials on polar-orbiting and geostationary satellites. Primarily sponsored by the NPOESS Program and NOAA, the ESRC is a tool for users seeking reliable sources of satellite information, training, and data. First published in September 2008, and upgraded in April 2009, the site is freely available at: http://www.meted.ucar.edu/esrc. Additional contributions to the ESRC are sought and made on an ongoing basis. The ESRC was created in response to a broad community request first made in May 2006. The COMET Program was asked to develop the site to consolidate and simplify access to reliable, current, and diverse information, training materials, and data associated with environmental satellites. The ESRC currently includes over 400 significant resources from NRL, CIMSS, CIRA, NASA, VISIT, NESDIS, and EUMETSAT, and improves access to the numerous satellite resources available from COMET’s MetEd Website. The ESRC is designed as a community site where organizations and individuals around the globe can easily submit their resources via online forms by providing a small set of metadata. The ESRC supports languages other than English and multi-lingual character sets have been tested. COMET’s role is threefold: 1) maintain the site, 2) populate it with our own materials, including smaller, focused learning objects derived from our larger training modules, and 3) provide the necessary quality assurance and monitoring to ensure that all resources are appropriate and well described before being made available. Our presentation will demonstrate many of the features and functionality of searching for resources using the ESRC, and will outline the steps for users to make their own submissions. For the site to reach its full potential, submissions representing diverse

  6. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false What are the requirements for a staffing and resource plan? 719.15 Section 719.15 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For...

  7. 10 CFR 719.16 - When must the staffing and resource plan be submitted?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false When must the staffing and resource plan be submitted? 719.16 Section 719.16 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.16 When must the staffing and resource plan be submitted? (a) For significant...

  8. 10 CFR 719.15 - What are the requirements for a staffing and resource plan?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false What are the requirements for a staffing and resource plan? 719.15 Section 719.15 Energy DEPARTMENT OF ENERGY CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS Legal Management Plan § 719.15 What are the requirements for a staffing and resource plan? (a) For significant matters, the contractor must require...

  9. Y-12 Site environmental protection program implementation plan (EPPIP)

    SciTech Connect

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  10. Planning Environmental Communication and Education: Lessons from Asia.

    ERIC Educational Resources Information Center

    Saeed, Seema, Ed.; Goldstein, Wendy, Ed.; Shrestha, Ram, Ed.

    This book presents the activities of the Asian Ministries for the Environment and government ministries relations with non-government organizations concerning planning environmental communication and education. This publication provides information on policies and strategies from a workshop organized by IUCN, UNEP, and UNESCO in Bangkok in July,…

  11. Environmentally Sound Small-Scale Agricultural Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Mohonk Trust, New Paltz, NY.

    This publication is the first of a series of manuals that present environmental guidelines for planning and implementing ecologically sustainable projects. Attention is particularly directed to the agricultural situation and needs of developing nations. Subject areas discussed include: (1) users and uses (identifying the major purposes of the…

  12. Environmentally Sound Small-Scale Water Projects. Guidelines for Planning.

    ERIC Educational Resources Information Center

    Tillman, Gus

    This manual is the second volume in a series of publications on community development programs. Guidelines are suggested for small-scale water projects that would benefit segments of the world's urban or rural poor. Strategies in project planning, implementation and evaluation are presented that emphasize environmental conservation and promote…

  13. Planning for Change: Assessing Internal and External Environmental Factors.

    ERIC Educational Resources Information Center

    Coffey, Janis Cox

    This report provides, first, an overview of the external and internal environmental factors affecting planning in California's community colleges; and, second, an examination of the influence of the demographics of the Los Rios Community College District (LRCCD). After an executive summary, introductory material discusses ways in which change can…

  14. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  15. 78 FR 16706 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  16. 75 FR 82066 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  17. 76 FR 73674 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal...

  18. President Jiang Zemin on family planning and environmental protection.

    PubMed

    Jiang, Z

    1998-06-01

    This article is an excerpt of a speech delivered by the Party General-Secretary and President of China, Jiang Zemin, on March 15, 1998. The occasion was the National Forum on Family Planning and Environmental Protection. It is stated that the link between family planning (FP) and environmental protection is related to sustainable social and economic development and future survival. Basic FP and environmental policies are national policies that must be carried out effectively and resolutely. New progress has been made in cleaning up pollution, especially in the Huaihe River. Effort is needed to effectively curb population growth in poor, rural areas and to reduce environmental pollution and ecological disruption. The Political Bureau of the Central Committee of the Chinese Communist Party has endorsed the goals of the FP program by 2000 and 2050. FP will be improved in poor areas, among the floating population, and according to the Three Stresses. The population policy aims to improve the quality of life. Emphasis should be placed on poverty stricken rural areas and those with ethnic minorities. Forceful measures to protect the environment are needed. Short term economic development should not compromise the environment. Environmental priorities should focus on the immediate problems that are a risk to public health. By the year 2000, all provinces should meet the standards for controlling industrial pollutants. Environmental deterioration must stop within the next 15 years. Restructuring of government and organizational reform should be conducive to FP and environmental protection.

  19. Automated negotiation in environmental resource management: Review and assessment.

    PubMed

    Eshragh, Faezeh; Pooyandeh, Majeed; Marceau, Danielle J

    2015-10-01

    Negotiation is an integral part of our daily life and plays an important role in resolving conflicts and facilitating human interactions. Automated negotiation, which aims at capturing the human negotiation process using artificial intelligence and machine learning techniques, is well-established in e-commerce, but its application in environmental resource management remains limited. This is due to the inherent uncertainties and complexity of environmental issues, along with the diversity of stakeholders' perspectives when dealing with these issues. The objective of this paper is to describe the main components of automated negotiation, review and compare machine learning techniques in automated negotiation, and provide a guideline for the selection of suitable methods in the particular context of stakeholders' negotiation over environmental resource issues. We advocate that automated negotiation can facilitate the involvement of stakeholders in the exploration of a plurality of solutions in order to reach a mutually satisfying agreement and contribute to informed decisions in environmental management along with the need for further studies to consolidate the potential of this modeling approach.

  20. Automated negotiation in environmental resource management: Review and assessment.

    PubMed

    Eshragh, Faezeh; Pooyandeh, Majeed; Marceau, Danielle J

    2015-10-01

    Negotiation is an integral part of our daily life and plays an important role in resolving conflicts and facilitating human interactions. Automated negotiation, which aims at capturing the human negotiation process using artificial intelligence and machine learning techniques, is well-established in e-commerce, but its application in environmental resource management remains limited. This is due to the inherent uncertainties and complexity of environmental issues, along with the diversity of stakeholders' perspectives when dealing with these issues. The objective of this paper is to describe the main components of automated negotiation, review and compare machine learning techniques in automated negotiation, and provide a guideline for the selection of suitable methods in the particular context of stakeholders' negotiation over environmental resource issues. We advocate that automated negotiation can facilitate the involvement of stakeholders in the exploration of a plurality of solutions in order to reach a mutually satisfying agreement and contribute to informed decisions in environmental management along with the need for further studies to consolidate the potential of this modeling approach. PMID:26241930

  1. Transmission planning in the era of integrated resource planning: A survey of recent cases

    SciTech Connect

    Baldick, R.; Kahn, E.P.

    1992-09-01

    State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

  2. Hierarchical resource analysis for land use planning through remote sensing

    NASA Technical Reports Server (NTRS)

    Byrnes, B. H.; Frazee, C. J.; Cox, T. L.

    1976-01-01

    A hierarchical resource analysis was applied to remote sensing data to provide maps at Planning Levels I and III (Anderson et al., U.S. Geological Survey Circular 671) for Meade County, S. Dak. Level I land use and general soil maps were prepared by visual interpretation of imagery from a false color composite of Landsat MSS bands 4, 5, and 7 and single bands (5 and 7). A modified Level III land use map was prepared for the Black Hills area from RB-57 photography enlarged to a scale of 1:24,000. Level III land use data were used together with computer-generated interpretive soil maps to analyze relationships between developed and developing areas and soil criteria.

  3. Water Resources Planning under Uncertainty: A "Real Options" Approach

    NASA Astrophysics Data System (ADS)

    Jeuland, M. A.; Whittington, D.

    2011-12-01

    This research develops a real options approach for planning new water resources developments, in infrastructure construction and system operation, under uncertainty. The approach treats the planning problem as a series of staged decisions - the selection of new projects; their scale, timing and sequencing; and finally their operating rules - each of which is characterized by varying levels of irreversibility. The performance of different configurations of the system is then assessed along the various dimensions of the decision space, using simulation methods. The methodology is then made operational using an existing hydrological simulation model that can be used to study the example of hydropower development options in the Blue Nile in Ethiopia. The model includes physical linkages between climate change and system hydrology, and allows users to test the sensitivity of the basin-wide economic consequences of dams, which consist of energy generation, changes in irrigation crop-water demand, the value of flood control, and other basin-wide impacts, to climate change or changes in runoff, as well as to other uncertainties. The analysis shows that, from an economic perspective, there is no single optimal system configuration across a range of future climate conditions deemed plausible for this basin. For example, small infrastructures perform best in scenarios with reduced runoff into the river, whereas large ones are best when runoff increases. The real options framework therefore becomes useful for helping to identify configurations that are both more robust to poor outcomes and still contain sufficient flexibility to capture high upside benefits should favorable future conditions arise. The framework could readily be extended to explore a range of features that could be usefully built into water resources projects more generally, to improve the long-term economic performance of such investments.

  4. Robust Decision Making and Info-Gap Decision Theory for water resource system planning

    NASA Astrophysics Data System (ADS)

    Matrosov, Evgenii S.; Woods, Ashley M.; Harou, Julien J.

    2013-06-01

    Stationarity assumptions of linked human-water systems are frequently invalid given the difficult-to-predict changes affecting such systems. In this case water planning occurs under conditions of deep or severe uncertainty, where the statistical distributions of future conditions and events are poorly known. In such situations predictive system simulation models are typically run under different scenarios to evaluate the performance of future plans under different conditions. Given that there are many possible plans and many possible futures, which simulations will lead to the best designs? Robust Decision Making (RDM) and Info-Gap Decision Theory (IGDT) provide a structured approach to planning complex systems under such uncertainty. Both RDM and IGDT make repeated use of trusted simulation models to evaluate different plans under different future conditions. Both methods seek to identify robust rather than optimal decisions, where a robust decision works satisfactorily over a broad range of possible futures. IGDT efficiently charts system performance with robustness and opportuneness plots summarising system performance for different plans under the most dire and favourable sets of future conditions. RDM samples a wider range of dire, benign and opportune futures and offers a holistic assessment of the performance of different options. RDM also identifies through ‘scenario discovery' which combinations of uncertain future stresses lead to system vulnerabilities. In our study we apply both frameworks to a water resource system planning problem: London's water supply system expansion in the Thames basin, UK. The methods help identify which out of 20 proposed water supply infrastructure portfolios is the most robust given severely uncertain future hydrological inflows, water demands and energy prices. Multiple criteria of system performance are considered: service reliability, storage susceptibility, capital and operating cost, energy use and environmental flows

  5. Environmental assessment of spatial plan policies through land use scenarios

    SciTech Connect

    Geneletti, Davide

    2012-01-15

    This paper presents a method based on scenario analysis to compare the environmental effects of different spatial plan policies in a range of possible futures. The study aimed at contributing to overcome two limitations encountered in Strategic Environmental Assessment (SEA) for spatial planning: poor exploration of how the future might unfold, and poor consideration of alternative plan policies. Scenarios were developed through what-if functions and spatial modeling in a Geographical Information System (GIS), and consisted in maps that represent future land uses under different assumptions on key driving forces. The use of land use scenarios provided a representation of how the different policies will look like on the ground. This allowed gaining a better understanding of the policies' implications on the environment, which could be measured through a set of indicators. The research undertook a case-study approach by developing and assessing land use scenarios for the future growth of Caia, a strategically-located and fast-developing town in rural Mozambique. The effects of alternative spatial plan policies were assessed against a set of environmental performance indicators, including deforestation, loss of agricultural land, encroachment of flood-prone areas and wetlands and access to water sources. In this way, critical environmental effects related to the implementation of each policy were identified and discussed, suggesting possible strategies to address them. - Graphical abstract: Display Omitted Research Highlights: Black-Right-Pointing-Pointer The method contributes to two critical issues in SEA: exploration of the future and consideration of alternatives. Black-Right-Pointing-Pointer Future scenarios are used to test the environmental performance of different spatial plan policies in uncertainty conditions. Black-Right-Pointing-Pointer Spatially-explicit land use scenarios provide a representation of how different policies will look like on the ground.

  6. Master Environmental Plan: Fort Wingate Depot Activity, Gallup, New Mexico

    SciTech Connect

    Biang, C.A.; Yuen, C.R.; Biang, R.P.; Antonopoulos, A.A.; Ditmars, J.D.

    1990-12-01

    The master environmental plan is based on an environmental assessment of the areas requiring environmental evaluation (AREEs) at Fort Wingate Depot Activity near Gallup, New Mexico. The Fort Wingate Depot Activity is slated for closure under the Base Closure and Realignment Act, Public Law 100--526. The MEP assesses the current status, describes additional data requirements, recommends actions for the sites, and establishes a priority order for actions. The plan was developed so that actions comply with hazardous waste and water quality regulations of the State of New Mexico and applicable federal regulations. It contains a brief history of the site, relevant geological and hydrological information, and a description of the current status for each AREE along with a discussion of the available site-specific data that pertain to existing or potential contamination and the impact on the environment. 35 refs., 27 figs., 23 tabs.

  7. Planning for environmental constraints on the PJM system

    SciTech Connect

    Not Available

    1994-07-15

    This chapter provides a snapshot of the existing PJM system and identifies the environmental constraints that form the parameters for the regional approaches analyzed in this study. The chapter begins with a description of the PJM system and the costs and emissions levels of the pollutants under study associated with the reference case (the PJM system configured to meet only Clean Air Act Amendment Phase I SO{sub 2} requirements and the March 1994 NO{sub x} requirements affecting Phase I units){sup 3}. Next, the pollution-reduction scenario assumed for the purpose of the study, which covers the period 1995--2010, is described. Finally, the impacts of this pollution reduction scenario -- emissions that would need to be avoided on the reference case PJM system -- are identified. Modeling methods are described alongside the study`s results. Other chapters discuss: environmental constraints, alternate plans to achieve environmental goals, and comparison of alternate plans.

  8. Theoretical Organization of Information: Research Review of a Sample of ERIC's Innovation Diffusion and Planned Change Documents Organized According to the Configuration, Linkage, Environment, Resource (CLER) Model of Planned Change.

    ERIC Educational Resources Information Center

    Brown, Gary

    This document is a review of research on the subject of innovation diffusion and planned change, organized according to a theoretical model. The organizational scheme used is derived from Bhola's Configurational, Linkages, Environmental, and Resources (CLER) model of planned change. Conventional reviews of research identify accomplishments in…

  9. An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem. [Spacelab inventory procurement planning

    NASA Technical Reports Server (NTRS)

    Schlagheck, R. A.

    1977-01-01

    New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

  10. Scenario Planning of California Water Resources with Climate Change

    NASA Astrophysics Data System (ADS)

    Yin, H.; Chung, F. I.; Anderson, J.

    2008-12-01

    Several advances have been made in using climate change projection information in water resources planning in California. Since there is uncertainty about future climate, 12 climate change projections were used to assess impacts on SWP and CVP operations. Average results for the 12 projections are presented in this summary. Current SWP and CVP infrastructure, regulations and operating rules were assumed. These studies indicate that climate change is expected to reduce the reliability of the SWP and CVP water supply systems. Annual Delta exports are expected to be reduced by 8% by mid-century and 15% by the end of the century. This would lead to reduced water deliveries south of the Delta. Decreases in reservoir carryover storage of 16% by mid-century and 28% by the end of the century would reduce the system's flexibility during water shortages. Groundwater pumping in the Sacramento Valley is expected to increase by 8% by mid-century and by 13% at the end of the century to augment surface water supplies. Power supply from the combined SWP and CVP is expected to decrease by 5% at mid-century and 8% by the end of the century. It is anticipated that the SWP and CVP will become vulnerable to operational interruption in about 10% of the years by mid-century and 15% of the years at the end of the century. To meet current regulatory requirements and to maintain minimum system operations during the vulnerable years, an additional 420 TAF/year of water by mid-century and an additional 610 TAF/year of water by the end of the century would be needed. This water could be obtained through additional water supplies, reductions in water demands, or a combination of the two. These results indicate a need to explore adaptation measures to improve the reliability of future water supplies in California. Because uncertainties associated with impacts analyses increase as the projection moves further into the future, and because a practical engineering planning horizon for most

  11. 77 FR 1717 - Notice of Availability; Draft Springfield Plateau Regional Restoration Plan and Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Fish and Wildlife Service Notice of Availability; Draft Springfield Plateau Regional Restoration Plan... Department of Natural Resources, have written a Draft Springfield Plateau Regional Restoration Plan and... Resource Damage Assessment and Restoration (NRDAR) regulations and NEPA regulations. DATES: To...

  12. The importance of team functioning to natural resource planning outcomes.

    PubMed

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination.

  13. Developing integrated methods to address complex resource and environmental issues

    USGS Publications Warehouse

    Smith, Kathleen S.; Phillips, Jeffrey D.; McCafferty, Anne E.; Clark, Roger N.

    2016-02-08

    IntroductionThis circular provides an overview of selected activities that were conducted within the U.S. Geological Survey (USGS) Integrated Methods Development Project, an interdisciplinary project designed to develop new tools and conduct innovative research requiring integration of geologic, geophysical, geochemical, and remote-sensing expertise. The project was supported by the USGS Mineral Resources Program, and its products and acquired capabilities have broad applications to missions throughout the USGS and beyond.In addressing challenges associated with understanding the location, quantity, and quality of mineral resources, and in investigating the potential environmental consequences of resource development, a number of field and laboratory capabilities and interpretative methodologies evolved from the project that have applications to traditional resource studies as well as to studies related to ecosystem health, human health, disaster and hazard assessment, and planetary science. New or improved tools and research findings developed within the project have been applied to other projects and activities. Specifically, geophysical equipment and techniques have been applied to a variety of traditional and nontraditional mineral- and energy-resource studies, military applications, environmental investigations, and applied research activities that involve climate change, mapping techniques, and monitoring capabilities. Diverse applied geochemistry activities provide a process-level understanding of the mobility, chemical speciation, and bioavailability of elements, particularly metals and metalloids, in a variety of environmental settings. Imaging spectroscopy capabilities maintained and developed within the project have been applied to traditional resource studies as well as to studies related to ecosystem health, human health, disaster assessment, and planetary science. Brief descriptions of capabilities and laboratory facilities and summaries of some

  14. Developing integrated methods to address complex resource and environmental issues

    USGS Publications Warehouse

    Smith, Kathleen S.; Phillips, Jeffrey D.; McCafferty, Anne E.; Clark, Roger N.

    2016-02-08

    IntroductionThis circular provides an overview of selected activities that were conducted within the U.S. Geological Survey (USGS) Integrated Methods Development Project, an interdisciplinary project designed to develop new tools and conduct innovative research requiring integration of geologic, geophysical, geochemical, and remote-sensing expertise. The project was supported by the USGS Mineral Resources Program, and its products and acquired capabilities have broad applications to missions throughout the USGS and beyond.In addressing challenges associated with understanding the location, quantity, and quality of mineral resources, and in investigating the potential environmental consequences of resource development, a number of field and laboratory capabilities and interpretative methodologies evolved from the project that have applications to traditional resource studies as well as to studies related to ecosystem health, human health, disaster and hazard assessment, and planetary science. New or improved tools and research findings developed within the project have been applied to other projects and activities. Specifically, geophysical equipment and techniques have been applied to a variety of traditional and nontraditional mineral- and energy-resource studies, military applications, environmental investigations, and applied research activities that involve climate change, mapping techniques, and monitoring capabilities. Diverse applied geochemistry activities provide a process-level understanding of the mobility, chemical speciation, and bioavailability of elements, particularly metals and metalloids, in a variety of environmental settings. Imaging spectroscopy capabilities maintained and developed within the project have been applied to traditional resource studies as well as to studies related to ecosystem health, human health, disaster assessment, and planetary science. Brief descriptions of capabilities and laboratory facilities and summaries of some

  15. CREST--classification resources for environmental sequence tags.

    PubMed

    Lanzén, Anders; Jørgensen, Steffen L; Huson, Daniel H; Gorfer, Markus; Grindhaug, Svenn Helge; Jonassen, Inge; Øvreås, Lise; Urich, Tim

    2012-01-01

    Sequencing of taxonomic or phylogenetic markers is becoming a fast and efficient method for studying environmental microbial communities. This has resulted in a steadily growing collection of marker sequences, most notably of the small-subunit (SSU) ribosomal RNA gene, and an increased understanding of microbial phylogeny, diversity and community composition patterns. However, to utilize these large datasets together with new sequencing technologies, a reliable and flexible system for taxonomic classification is critical. We developed CREST (Classification Resources for Environmental Sequence Tags), a set of resources and tools for generating and utilizing custom taxonomies and reference datasets for classification of environmental sequences. CREST uses an alignment-based classification method with the lowest common ancestor algorithm. It also uses explicit rank similarity criteria to reduce false positives and identify novel taxa. We implemented this method in a web server, a command line tool and the graphical user interfaced program MEGAN. Further, we provide the SSU rRNA reference database and taxonomy SilvaMod, derived from the publicly available SILVA SSURef, for classification of sequences from bacteria, archaea and eukaryotes. Using cross-validation and environmental datasets, we compared the performance of CREST and SilvaMod to the RDP Classifier. We also utilized Greengenes as a reference database, both with CREST and the RDP Classifier. These analyses indicate that CREST performs better than alignment-free methods with higher recall rate (sensitivity) as well as precision, and with the ability to accurately identify most sequences from novel taxa. Classification using SilvaMod performed better than with Greengenes, particularly when applied to environmental sequences. CREST is freely available under a GNU General Public License (v3) from http://apps.cbu.uib.no/crest and http://lcaclassifier.googlecode.com. PMID:23145153

  16. CREST – Classification Resources for Environmental Sequence Tags

    PubMed Central

    Lanzén, Anders; Jørgensen, Steffen L.; Huson, Daniel H.; Gorfer, Markus; Grindhaug, Svenn Helge; Jonassen, Inge; Øvreås, Lise; Urich, Tim

    2012-01-01

    Sequencing of taxonomic or phylogenetic markers is becoming a fast and efficient method for studying environmental microbial communities. This has resulted in a steadily growing collection of marker sequences, most notably of the small-subunit (SSU) ribosomal RNA gene, and an increased understanding of microbial phylogeny, diversity and community composition patterns. However, to utilize these large datasets together with new sequencing technologies, a reliable and flexible system for taxonomic classification is critical. We developed CREST (Classification Resources for Environmental Sequence Tags), a set of resources and tools for generating and utilizing custom taxonomies and reference datasets for classification of environmental sequences. CREST uses an alignment-based classification method with the lowest common ancestor algorithm. It also uses explicit rank similarity criteria to reduce false positives and identify novel taxa. We implemented this method in a web server, a command line tool and the graphical user interfaced program MEGAN. Further, we provide the SSU rRNA reference database and taxonomy SilvaMod, derived from the publicly available SILVA SSURef, for classification of sequences from bacteria, archaea and eukaryotes. Using cross-validation and environmental datasets, we compared the performance of CREST and SilvaMod to the RDP Classifier. We also utilized Greengenes as a reference database, both with CREST and the RDP Classifier. These analyses indicate that CREST performs better than alignment-free methods with higher recall rate (sensitivity) as well as precision, and with the ability to accurately identify most sequences from novel taxa. Classification using SilvaMod performed better than with Greengenes, particularly when applied to environmental sequences. CREST is freely available under a GNU General Public License (v3) from http://apps.cbu.uib.no/crest and http://lcaclassifier.googlecode.com. PMID:23145153

  17. CREST--classification resources for environmental sequence tags.

    PubMed

    Lanzén, Anders; Jørgensen, Steffen L; Huson, Daniel H; Gorfer, Markus; Grindhaug, Svenn Helge; Jonassen, Inge; Øvreås, Lise; Urich, Tim

    2012-01-01

    Sequencing of taxonomic or phylogenetic markers is becoming a fast and efficient method for studying environmental microbial communities. This has resulted in a steadily growing collection of marker sequences, most notably of the small-subunit (SSU) ribosomal RNA gene, and an increased understanding of microbial phylogeny, diversity and community composition patterns. However, to utilize these large datasets together with new sequencing technologies, a reliable and flexible system for taxonomic classification is critical. We developed CREST (Classification Resources for Environmental Sequence Tags), a set of resources and tools for generating and utilizing custom taxonomies and reference datasets for classification of environmental sequences. CREST uses an alignment-based classification method with the lowest common ancestor algorithm. It also uses explicit rank similarity criteria to reduce false positives and identify novel taxa. We implemented this method in a web server, a command line tool and the graphical user interfaced program MEGAN. Further, we provide the SSU rRNA reference database and taxonomy SilvaMod, derived from the publicly available SILVA SSURef, for classification of sequences from bacteria, archaea and eukaryotes. Using cross-validation and environmental datasets, we compared the performance of CREST and SilvaMod to the RDP Classifier. We also utilized Greengenes as a reference database, both with CREST and the RDP Classifier. These analyses indicate that CREST performs better than alignment-free methods with higher recall rate (sensitivity) as well as precision, and with the ability to accurately identify most sequences from novel taxa. Classification using SilvaMod performed better than with Greengenes, particularly when applied to environmental sequences. CREST is freely available under a GNU General Public License (v3) from http://apps.cbu.uib.no/crest and http://lcaclassifier.googlecode.com.

  18. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  19. An introduction to My Environmental Education Evaluation Resource Assistant (MEERA), a web-based resource for self-directed learning about environmental education program evaluation.

    PubMed

    Zint, Michaela

    2010-05-01

    My Environmental Education Evaluation Resource Assistant or "MEERA" is a web-site designed to support environmental educators' program evaluation activities. MEERA has several characteristics that set it apart from other self-directed learning evaluation resources. Readers are encouraged to explore the site and to reflect on the role that self-directed learning resources can play in program evaluation and how those resources could be better designed.

  20. 25 CFR 161.200 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... goals and objectives in the agricultural resource management plan developed by the Navajo Nation, or by... resources; (2) Identify specific tribal agricultural resource goals and objectives; (3) Establish management... resource management objectives; and (5) Identify actions to be taken to reach established objectives....

  1. Hanford Site waste management and environmental restoration integration plan

    SciTech Connect

    Merrick, D.L.

    1990-04-30

    The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

  2. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    SciTech Connect

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  3. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix D: Cultural Resources.

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    This study attempts to identify and analyze the impacts of the System Operating Strategy (SOS) alternatives on cultural resources. The impacts include effects on Native American traditional cultural values, properties and practices. They also include effects on archeological or historic properties meeting the criteria of the National Register of Historic Places. In addition to responding to the requirements of the National Environmental Policy Act (NEPA), this analysis addresses the requirements of the National Historic Preservation Act (NHPA), the Archeological Resources Protection Act (ARPA), the Native American Graves Protection and Repatriation Act (NAGPRA), the Native American Religious Freedom Act (NARFA), and other relevant legislation. To meet their legally mandated cultural resources requirements, the SOR agencies will develop agreements and Implementation Plans with the appropriate State Historic Preservation Officers (SHPOs), Tribes, and the Advisory Council on Historic Preservation (ACHP) detailing the measures necessary to best manage the resource. The planning and implementation activities will be staged over a number of years in consultation with affected Tribes.

  4. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a... cost of such activities under §§ 1003.201 through 1003.204. (b)...

  5. Advanced Coal Conversion Process Demonstration Project. Environmental Monitoring Plan

    SciTech Connect

    Not Available

    1992-04-01

    Western Energy Company (WECO) was selected by the Department of Energy (DOE) to demonstrate the Advanced Coal Conversion Process (ACCP) which upgrades low rank coals into high Btu, low sulfur, synthetic bituminous coal. As specified in the Corporate Agreement, RSCP is required to develop an Environmental Monitoring Plan (EMP) which describes in detail the environmental monitoring activities to be performed during the project execution. The purpose of the EMP is to: (1) identify monitoring activities that will be undertaken to show compliance to applicable regulations, (2) confirm the specific environmental impacts predicted in the National Environmental Policy Act documentation, and (3) establish an information base of the assessment of the environmental performance of the technology demonstrated by the project. The EMP specifies the streams to be monitored (e.g. gaseous, aqueous, and solid waste), the parameters to be measured (e.g. temperature, pressure, flow rate), and the species to be analyzed (e.g. sulfur compounds, nitrogen compounds, trace elements) as well as human health and safety exposure levels. The operation and frequency of the monitoring activities is specified, as well as the timing for the monitoring activities related to project phase (e.g. preconstruction, construction, commissioning, operational, post-operational). The EMP is designed to assess the environmental impacts and the environmental improvements resulting from construction and operation of the project.

  6. Environmental monitoring plan for the Oak Ridge Reservation

    SciTech Connect

    Not Available

    1992-09-01

    The Environmental Monitoring Plan (EMP) for the Oak Ridge Reservation (ORR) is an omnibus document providing a single point of reference for the effluent monitoring and environmental surveillance programs of Oak Ridge National Laboratory (ORNL), Y-12 Plant, K-25 Site, and ORR areas outside specific facility boundaries. Authorization and requirement for the EMP are contained in Department of Energy (DOE) Order 5400.1 Chapter 4, which states that environmental monitoring consists of two major activities: effluent monitoring and environmental surveillance. This EMP is intended to document the rationale and design criteria for the effluent monitoring and environmental surveillance programs, extent and frequency of sampling and analysis, analytical laboratory procedures, quality assurance, implementation, and reporting. The EMP describes one of several programs that collect and analyze data to assess the impacts of ORR on the environment and human health. Others include the Environmental Restoration Program and the Clinch River Remedial Investigation Program. While the ultimate goal for DOE may be to integrate information from all these programs into a formalized assessment of risk to ecosystems and human health, that level of integration is beyond the scope of the EMP. The EMP outlines the goals of environmental monitoring for the ORR and its facilities and includes activities that are not presently conducted. In general, the programs described in this EMP represent an increase in surveillance activities over past practices.

  7. Technical procedures for water resources: Volume 3, Environmental Field Program, Deaf Smith County Site, Texas: Final draft

    SciTech Connect

    Not Available

    1987-08-01

    To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Water Resources (ONWI, 1987). This technical procedure (TP) has been developed to implement the field program described in the Water Resources Site Study Plan. This procedure provides the general method for the field collection of water and sediment samples from playa lakes using an Alpha horizontal type sampler or equivalent or a peristaltic pump for water and a KB-coring devise or ponar grab for sediments. The samples will be preserved and then shipped to a laboratory for analysis. The water quality and sediment samples will be collected as part of the surface-water quality field study described in the Site Plan for Water Resources. 15 refs., 5 figs., 3 tabs.

  8. HEDR model validation plan. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Napier, B.A.; Gilbert, R.O.; Simpson, J.C.; Ramsdell, J.V. Jr.; Thiede, M.E.; Walters, W.H.

    1993-06-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project has developed a set of computational ``tools`` for estimating the possible radiation dose that individuals may have received from past Hanford Site operations. This document describes the planned activities to ``validate`` these tools. In the sense of the HEDR Project, ``validation`` is a process carried out by comparing computational model predictions with field observations and experimental measurements that are independent of those used to develop the model.

  9. Exxon Valdez oil spill restoration plan. Final environmental impact statement

    SciTech Connect

    1994-09-01

    The purpose of the proposed action analyzed in this final environmental impact statement (FEIS) is to restore, insofar as possible, the injured natural resources and thereby the services they provide that were affected by the Exxon Valdex oil spill (EVOS). The purpose of this document is to analyze the effects of proposed uses of the remaining funds (approximately $620 million as of February 1994, after final reimbursements) in accomplishing the mission of the Trustee Council.

  10. The role of competitive forces in integrated resource planning

    SciTech Connect

    Kahn, E.; Goldman, C.

    1991-10-01

    In this report, we study the potential for competitive forces to enhance the efficiency of integrated resource planning and produce consumer cost reductions. We examine the efficiency gains from competition in the private power market, and ask whether similar forces can be successful on the demand-side of the market. The goal of this analysis is to identify and elucidate options available to state Public Utility Commissions (PUCs) to support competition in utility demand-side management programs to achieve efficiencies similar to those being achieved through development of competitive forces on the supply-side of the industry. We consider the entire market structure from upstream suppliers to distribution intermediaries to ultimate consumers. The market structure differs substantially between the demand-side and the supply-side of the electricity market. Demand-site electricity markets have a longer distribution chain and more intermediaries than the supply-side, which is attributable in part to the ultimately retail nature of demand and the wholesale nature of supply, and in part indicates market failures.

  11. A case study of exploiting enterprise resource planning requirements

    NASA Astrophysics Data System (ADS)

    Niu, Nan; Jin, Mingzhou; Cheng, Jing-Ru C.

    2011-05-01

    The requirements engineering (RE) processes have become a key to conceptualising corporate-wide integrated solutions based on packaged enterprise resource planning (ERP) software. The RE literature has mainly focused on procuring the most suitable ERP package. Little is known about how an organisation exploits the chosen ERP RE model to frame the business application development. This article reports an exploratory case study of a key tenet of ERP RE adoption, namely that aligning business applications to the packaged RE model leads to integral practices and economic development. The case study analysed a series interrelated pilot projects developed for a business division of a large IT manufacturing and service company, using Oracle's appl1ication implementation method (AIM). The study indicated that AIM RE improved team collaboration and project management experience, but needed to make hidden assumptions explicit to support data visibility and integrity. Our study can direct researchers towards rigorous empirical evaluations of ERP RE adoption, collect experiences and lessons learned for practitioners, and help generate more effective and mature processes when exploiting ERP RE methods.

  12. Water resources planning under the Fish and Wildlife Coordination Act

    USGS Publications Warehouse

    Stutzman, Karl F.

    1980-01-01

    This paper briefly discusses the more significant provisions of the Fish and Wildlife Coordination Act (1958). It covers pertinent aspects of legislative history, the development and current status (April 1980) of certain policies relevant to administering the Act, and other matters. It is directed primarily to practicing fish and wildlife agency field biologists, planners, and decisionmakers engaged in water resources development activities under the Act. It is not intended to be exhaustive in its treatment. The Fish and Wildlife Coordination Act provides a basic procedural framework for the orderly consideration of fish and wildlife conservation measures to be incorporated into Federal and Federally permitted or licensed water development projects. The principal provisions of the Act include: 1. a statement of Congressional purpose that fish and wildlife conservation shall receive equal consideration with other project features; 2. mandatory consultation with wildlife agencies with a view to achieving such conservation; 3. full consideration by action of the recommendations stemming from consultation; 4. authority for action agencies to implement such recommendations as they find acceptable. The FWCA in effect amends, conditions, or supplements other Federal laws and is thus closely linked in its application and interpretation. It is similarly linked to Federal planning standards and procedures. Because of this, interpretations tend to be flexible and evolve, adapting to changing situations. The following reference matrix outlines selected sections of the Fish and Wildlife Coordination Act which are of particular relevance to planners.

  13. Environmental geology for land use and regional planning in the Bandung Basin, West Java, Indonesia

    NASA Astrophysics Data System (ADS)

    Suhari, S.; Siebenhüner, M.

    The demand on land and natural resources in the Greater Bandung area increases rapidly with increasing population and economic growth. Land use changes and over-exploitation of natural resources have significantly caused negative environmental impacts. In the period 1989-1993, an Indonesian-German technical cooperation project between the Directorate of Environmental Geology (Indonesia) and the Federal Institute for Geosciences and Natural Resources (Germany) has been conducting a study to improve the conservation and management of the natural resources for regional planning in the Bandung Basin. The Bandung Basin consists of a plain which is surrounded by a mountainous chain. The mountainous area is mostly dominated by Quaternary volcanic products such as lava, breccia, agglomerate, lahar, tuff, and andesite intrusions. The plain comprises thick alluvial deposits of river and lacustrine origin. Tertiary sediments only cover the western part of the basin. The Quaternary volcanic products do not only produce fertile agricultural soils but also are the important source of various construction materials and act as groundwater recharge. From the environmental geology point of view, the physical development,of the Greater Bandung area faces various constraints. These include conflict among urban development, agricultural land, groundwater protection, extraction of mineral resources, and potential waste disposal sites. In addition, some areas are restricted for development due to: (a) their poor foundation characteristics; (b) location in flood prone areas; and (c) geological hazards such as landslides and lahar flows. Operation of many existing and abandoned waste disposal dumping facilities in geologically unfavorable areas has contaminated both the groundwater and surface water. Improper exploitation technique in many quarries and pits has also endangered the environment, such as destabilization of slope, increasing danger of landslides and erosion, and increasing

  14. Undiscovered Locatable Mineral Resources in the Bay Resource Management Plan Area, Southwestern Alaska: A Probabilistic Assessment

    USGS Publications Warehouse

    Schmidt, J.M.; Light, T.D.; Drew, L.J.; Wilson, F.H.; Miller, M.L.; Saltus, R.W.

    2007-01-01

    The Bay Resource Management Plan (RMP) area in southwestern Alaska, north and northeast of Bristol Bay contains significant potential for undiscovered locatable mineral resources of base and precious metals, in addition to metallic mineral deposits that are already known. A quantitative probabilistic assessment has identified 24 tracts of land that are permissive for 17 mineral deposit model types likely to be explored for within the next 15 years in this region. Commodities we discuss in this report that have potential to occur in the Bay RMP area are Ag, Au, Cr, Cu, Fe, Hg, Mo, Pb, Sn, W, Zn, and platinum-group elements. Geoscience data for the region are sufficient to make quantitative estimates of the number of undiscovered deposits only for porphyry copper, epithermal vein, copper skarn, iron skarn, hot-spring mercury, placer gold, and placer platinum-deposit models. A description of a group of shallow- to intermediate-level intrusion-related gold deposits is combined with grade and tonnage data from 13 deposits of this type to provide a quantitative estimate of undiscovered deposits of this new type. We estimate that significant resources of Ag, Au, Cu, Fe, Hg, Mo, Pb, and Pt occur in the Bay Resource Management Plan area in these deposit types. At the 10th percentile probability level, the Bay RMP area is estimated to contain 10,067 metric tons silver, 1,485 metric tons gold, 12.66 million metric tons copper, 560 million metric tons iron, 8,100 metric tons mercury, 500,000 metric tons molybdenum, 150 metric tons lead, and 17 metric tons of platinum in undiscovered deposits of the eight quantified deposit types. At the 90th percentile probability level, the Bay RMP area is estimated to contain 89 metric tons silver, 14 metric tons gold, 911,215 metric tons copper, 330,000 metric tons iron, 1 metric ton mercury, 8,600 metric tons molybdenum and 1 metric ton platinum in undiscovered deposits of the eight deposit types. Other commodities, which may occur in the

  15. 78 FR 69127 - Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... National Park Service Supplemental Draft Environmental Impact Statement/General Management Plan, Biscayne National Park, Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability of a Supplemental Draft Environmental Impact Statement for the General Management Plan, Biscayne National...

  16. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... National Park Service Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park AGENCY: National Park Service, Interior. ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter Use Plan, Yellowstone National Park....

  17. Assessment of Geothermal Resources for Electric Generation in the Pacific Northwest, Draft Issue Paper for the Northwest Power Planning Council

    SciTech Connect

    Geyer, John D.; Kellerman, L.M.; Bloomquist, R.G.

    1989-09-26

    This document reviews the geothermal history, technology, costs, and Pacific Northwest potentials. The report discusses geothermal generation, geothermal resources in the Pacific Northwest, cost and operating characteristics of geothermal power plants, environmental effects of geothermal generation, and prospects for development in the Pacific Northwest. This report was prepared expressly for use by the Northwest Power Planning Council. The report contains numerous references at the end of the document. [DJE-2005

  18. Recommended Resources for Planning to Evaluate Program Improvement Efforts (Including the SSIP)

    ERIC Educational Resources Information Center

    National Center for Systemic Improvement at WestEd, 2015

    2015-01-01

    This document provides a list of recommended existing resources for state Part C and Part B 619 staff and technical assistance (TA) providers to utilize to support evaluation planning for program improvement efforts (including the State Systemic Improvement Plan, SSIP). There are many resources available related to evaluation and evaluation…

  19. 25 CFR 161.200 - Is an Indian agricultural resource management plan required?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... goals and objectives in the agricultural resource management plan developed by the Navajo Nation, or by BIA in close consultation with the Navajo Nation, under the Agricultural Act. (b) The 10-year agricultural resource management and monitoring plan must be developed through public meetings and...

  20. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    SciTech Connect

    NELSON, R.L.

    2000-06-06

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm.

  1. Exploring the Factors of an Enterprise Resource Planning System in a Local Government Organization

    ERIC Educational Resources Information Center

    Shaw, Bryan T.

    2012-01-01

    The enterprise resource planning (ERP) system industry accounts for $8.8 billion annually. Enterprise resource planning systems are not performing as expected due to implementation barriers, changes in job responsibilities, and access to information; 50% of all information technology failures are due to the implementation of ERP systems. Guided by…

  2. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    ERIC Educational Resources Information Center

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  3. An Introduction to "My Environmental Education Evaluation Resource Assistant" (MEERA), a Web-Based Resource for Self-Directed Learning about Environmental Education Program Evaluation

    ERIC Educational Resources Information Center

    Zint, Michaela

    2010-01-01

    My Environmental Education Evaluation Resource Assistant or "MEERA" is a web-site designed to support environmental educators' program evaluation activities. MEERA has several characteristics that set it apart from other self-directed learning evaluation resources. Readers are encouraged to explore the site and to reflect on the role that…

  4. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR... reservoirs, aqueducts, power plants, and pumping stations operated within the California State Water...

  5. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  6. Online resources for news about toxicology and other environmental topics.

    PubMed

    South, J C

    2001-01-12

    Technology has revolutionized researchers' ability to find and retrieve news stories and press releases. Thanks to electronic library systems and telecommunications--notably the Internet--computer users in seconds can sift through millions of articles to locate mainstream articles about toxicology and other environmental topics. But that does not mean it is easy to find what one is looking for. There is a confusing array of databases and services that archive news articles and press releases: (1) some are free; others cost thousands of dollars a year to access, (2) some include hundreds of newspaper and magazine titles; others cover only one publication, (3) some contain archives going back decades; others have just the latest news, (4) some offer only journalistically balanced reports from mainstream news sources; others mix news with opinions and advocacy and include reports from obscure or biased sources. This article explores ways to find news online - particularly news about toxicology, hazardous chemicals, environmental health and the environment in general. The article covers web sites devoted to environmental news; sites and search engines for general-interest news; newspaper archives; commercial information services; press release distribution services and archives; and other resources and strategies for finding articles in the popular press about toxicology and the environment. PMID:11164981

  7. 76 FR 23335 - Wilderness Stewardship Plan/Environmental Impact Statement, Sequoia and Kings Canyon National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... planning and environmental impact analysis process required to inform consideration of alternative..., and adhering to legally-mandated management and preservation requirements. This planning process... wilderness planning process. All written comments must be transmitted, postmarked, or hand-delivered no...

  8. Archaeological resource management plan of the Savannah River Archaeological Research Program

    SciTech Connect

    Not Available

    1989-12-01

    This Archaeological Resource management Plan addresses the future cultural resource management needs of the United States Department of Energy's (DOE) Savannah River Site (SRS). The archaeological information contained herein is based on prehistoric and historic archaeological syntheses prepared by the Savannah River Archaeological Research Program (SRARP) for the SRS. The syntheses also address future research directions that will facilitate better management of the cultural resources. This document is a prelude to a Programmatic Memorandum of Agreement (PMOA) which, in conjunction with this Archaeological Resource Management Plan, will assure SRS continued compliance with all applicable federal laws and regulations in concert with any DOE plans, policies and directives. 225 refs., 21 figs., 8 tabs.

  9. ENVIRONMENTAL PLANNING FOR SMALL COMMUNITIES: A GUIDE FOR LOCAL DECISION-MAKERS

    EPA Science Inventory

    Environmental Planning for Small Communities - A Guide for Local Decision-Makers presents a process for creating and implementing a community environmental plan. With a comprehensive environmental plan, local decision-makers can create an integrated approach to protecting the env...

  10. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    SciTech Connect

    Not Available

    1993-11-01

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  11. Planning and Design of Water Resources Systems Under Climate Change and Variability

    NASA Astrophysics Data System (ADS)

    Strzepek, K. M.

    2014-12-01

    Regional and local water supplies and demands are impacted by global and national systems: climate, economics, population and energy as well as policies: development, energy, and environmental. These drivers can result in complex interactions that require deeper understanding in order to provide actionable information for water planners and stakeholders to develop strategic plans in the face of a changing and growing world. To add more complexity to this issue is the fact that all these drivers are uncertain and the type of uncertainty is not the same. This talk will address approaches to Water Resource Planning at sub-national water regions, national levels and trans-boundary river basins under a non-stationary hydro-climatic future. Additionally the talk will address the design of specific water resource projects such as reservoirs and hydroplants that are being designed now but will operate far in the future when the hydro-climatology will be very different. Examples will be drawn from recent work in Africa, Eastern Europe and Central Asia, and North America and some insights and outstanding questions will be presented.

  12. 77 FR 39253 - Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan, Denali...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... NATIONAL PARK SERVICE Final Environmental Impact Statement on the Denali Park Road Vehicle Management Plan... of the Final Environmental Impact Statement for the Denali Park Road Vehicle Management Plan. SUMMARY... Denali Park Road Vehicle Management Plan (Plan/FEIS), for Denali National Park and Preserve, Alaska....

  13. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... National Park Service Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement... Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan, Biscayne National... Impact Statement for the Coral Reef Restoration Plan (Plan/FEIS) for Biscayne National Park, Florida....

  14. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... Director's Order 12: Conservation Planning, Environmental Impact Analysis, and Decision-making, and NPS...://www.faa.gov/about/office_org/headquarters_offices/arc/programs/air_tour_management_plan/ NPS Planning... Federal Aviation Administration Air Tour Management Plan Environmental Assessment for Mount...

  15. Environmental resources of selected areas of Hawaii: Cultural environment and aesthetic resources

    SciTech Connect

    Trettin, L.D.; Petrich, C.H.; Saulsbury, J.W.

    1996-01-01

    This report has been prepared to make available and archive the background scientific data and related information collected on the cultural environment and aesthetic resources during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The cultural environment in the Geothermal Resource Zone (GRZ) and associated study area consists of Native Hawaiian cultural and religious practices and both Native Hawaiian and non-Native Hawaiian cultural resources. This report consists of three sections: (1) a description of Native Hawaiian cultural and religious rights, practices, and values; (2) a description of historic, prehistoric, and traditional Native Hawaiian sites; and (3) a description of other (non-native) sites that could be affected by development in the study area. Within each section, the level of descriptive detail varies according to the information currently available. The description of the cultural environment is most specific in its coverage of the Geothermal Resource Subzones in the Puna District of the island of Hawaii and the study area of South Maui. Ethnographic and archaeological reports by Cultural Advocacy Network Developing Options and International Archaeological Research Institute, Inc., respectively, supplement the descriptions of these two areas with new information collected specifically for this study. Less detailed descriptions of additional study areas on Oahu, Maui, Molokai, and the island of Hawaii are based on existing archaeological surveys.

  16. Planning In Rural Areas: Evaluation of The Land Resource.

    ERIC Educational Resources Information Center

    Carlson, Steven A.; Denney, Evan

    A rural land use project originated in the early 1970s when a landowner approached the University of Montana's Department of Geography asking for assistance in planning the use of more than 10,000 acres. The planning process evolved into four phases; the first three phases (biophysical assessment, capability analysis, and master planning) have…

  17. Large scale Wyoming transportation data: a resource planning tool

    USGS Publications Warehouse

    O'Donnell, Michael S.; Fancher, Tammy S.; Freeman, Aaron T.; Ziegler, Abra E.; Bowen, Zachary H.; Aldridge, Cameron L.

    2014-01-01

    The U.S. Geological Survey Fort Collins Science Center created statewide roads data for the Bureau of Land Management Wyoming State Office using 2009 aerial photography from the National Agriculture Imagery Program. The updated roads data resolves known concerns of omission, commission, and inconsistent representation of map scale, attribution, and ground reference dates which were present in the original source data. To ensure a systematic and repeatable approach of capturing roads on the landscape using on-screen digitizing from true color National Agriculture Imagery Program imagery, we developed a photogrammetry key and quality assurance/quality control protocols. Therefore, the updated statewide roads data will support the Bureau of Land Management’s resource management requirements with a standardized map product representing 2009 ground conditions. The updated Geographic Information System roads data set product, represented at 1:4,000 and +/- 10 meters spatial accuracy, contains 425,275 kilometers within eight attribute classes. The quality control of these products indicated a 97.7 percent accuracy of aspatial information and 98.0 percent accuracy of spatial locations. Approximately 48 percent of the updated roads data was corrected for spatial errors of greater than 1 meter relative to the pre-existing road data. Twenty-six percent of the updated roads involved correcting spatial errors of greater than 5 meters and 17 percent of the updated roads involved correcting spatial errors of greater than 9 meters. The Bureau of Land Management, other land managers, and researchers can use these new statewide roads data set products to support important studies and management decisions regarding land use changes, transportation and planning needs, transportation safety, wildlife applications, and other studies.

  18. Water Foundations Teachers Guide. The Science of Florida's Water Resources: Lesson Plans for Teachers and Students.

    ERIC Educational Resources Information Center

    2001

    This document features lesson plans for teachers and students on Florida's water resources. The guide is divided into four grade levels: K-2, 3-5, 6-8, and 9-12. Each grade level includes objectives, guides, and five lesson plans. K-2 lesson plans include: (1) "We Are Water"; (2) "Why Water is Extra Special"; (3) "Water's Changing Shapes"; (4)…

  19. 75 FR 30426 - Notice of Availability of Record of Decision for the Kemmerer Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... (ROD)/Approved Resource Management Plan (RMP) for the Kemmerer Field Office planning area located in... (307) 828-4500; or e-mail John_Christensen@blm.gov and Michelle_Easley@blm.gov , respectively..., county governments, other Federal agencies, and tribal governments. The Kemmerer RMP planning...

  20. School/Public Library Cooperation: A Community Planning Process for Illinois. Resource Supplement.

    ERIC Educational Resources Information Center

    Illinois State Board of Education, Springfield. Illinois Resource and Dissemination Network.

    Intended for use in conjunction with the Illinois Office of Education's School/Public Library Cooperative Community Planning Process Training Manual, this resource supplement contains guidelines for collecting information on planning team members; a suggested agenda for a cooperative planning training seminar; a suggested seminar evaluation form;…

  1. Making Resources Matter: A Systematic Approach to Developing the Local Consolidated Plan. Modules One [to] Ten.

    ERIC Educational Resources Information Center

    Bowman, Diana; Williams, Jean

    This guide is designed to help school districts develop a consolidated plan for programs and resources. It outlines the importance of generating a consolidated plan to reduce duplication, identify children's needs, and coordinate funds from various programs. Consisting of 10 modules, the guide addresses all components of the planning process and…

  2. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    PubMed

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  3. Expert knowledge based modeling for integrated water resources planning and management in the Zayandehrud River Basin

    NASA Astrophysics Data System (ADS)

    Safavi, Hamid R.; Golmohammadi, Mohammad H.; Sandoval-Solis, Samuel

    2015-09-01

    This study highlights the need for water resource planning and management using expert knowledge to model known extreme hydrologic variability in complex hydrologic systems with lack of data. The Zayandehrud River Basin in Iran is used as an example of complex water system; this study provides a comprehensive description of the basin, including its water demands (municipal, agricultural, industrial and environmental) and water supply resources (rivers, inter-basin water transfer and aquifers). The objective of this study is to evaluate near future conditions of the basin (from Oct./2015 to Sep./2019) considering the current water management policies and climate change conditions, referred as Baseline scenario. A planning model for the Zayandehrud basin was built to evaluate the Baseline scenario, the period of hydrologic analysis is 21 years, (from Oct./1991 to Sep./2011); it was calibrated for 17 years and validated for 4 years using a Historic scenario that considered historic water supply, infrastructure and hydrologic conditions. Because the Zayandehrud model is a planning model and not a hydrologic model (rainfall-runoff model), an Adaptive Network-based Fuzzy Inference System (ANFIS) is used to generate synthetic natural flows considering temperature and precipitation as inputs. This model is an expert knowledge and data based model which has the benefits of Artificial Neural Networks (ANN) and Fuzzy Inference Systems (FIS). Outputs of the ANFIS model were compared to the Historic scenario results and are used in the Baseline scenario. Three metrics are used to evaluate the goodness of fit of the ANFIS model. Water supply results of the Baseline scenario are analyzed using five performance criteria: time-based and volumetric reliability, resilience, vulnerability and maximum deficit. One index, the Water Resources Sustainability Index is used to summarize the performance criteria results and to facilitate comparison among trade-offs. Results for the Baseline

  4. From chemical risk assessment to environmental resources management: the challenge for mining.

    PubMed

    Voulvoulis, Nikolaos; Skolout, John W F; Oates, Christopher J; Plant, Jane A

    2013-11-01

    On top of significant improvements and progress made through science and engineering in the last century to increase efficiency and reduce impacts of mining to the environment, risk assessment has an important role to play in further reducing such impacts and preventing and mitigating risks. This paper reflects on how risk assessment can improve planning, monitoring and management in mining and mineral processing operations focusing on the importance of better understanding source-pathway-receptor linkages for all stages of mining. However, in light of the ever-growing consumption and demand for raw materials from mining, the need to manage environmental resources more sustainably is becoming increasingly important. The paper therefore assesses how mining can form an integral part of wider sustainable resources management, with the need for re-assessing the potential of mining in the context of sustainable management of natural capital, and with a renewed focus on its the role from a systems perspective. The need for understanding demand and pressure on resources, followed by appropriate pricing that is inclusive of all environmental costs, with new opportunities for mining in the wastes we generate, is also discussed. Findings demonstrate the need for a life cycle perspective in closing the loop between mining, production, consumption and waste generation as the way forward.

  5. Idaho National Engineering and Environmental Laboratory institutional plan -- FY 2000--2004

    SciTech Connect

    Enge, R.S.

    1999-12-01

    In this first institutional plan prepared by Bechtel BWXT Idaho, LLC, for the Idaho National Engineering and Environmental Laboratory, the INEEL will focus its efforts on three strategic thrusts: (1) Environmental Management stewardship for DOE-EM, (2) Nuclear reactor technology for DOE-Nuclear Energy (NE), and (3) Energy R and D, demonstration, and deployment (initial focus on biofuels and chemicals from biomass). The first strategic thrust focuses on meeting DOE-EMs environmental cleanup and long-term stewardship needs in a manner that is safe, cost-effective, science-based, and approved by key stakeholders. The science base at the INEEL will be further used to address a grand challenge for the INEEL and the DOE complex--the development of a fundamental scientific understanding of the migration of subsurface contaminants. The second strategic thrust is directed at DOE-NEs needs for safe, economical, waste-minimized, and proliferation-resistant nuclear technologies. As NE lead laboratories, the INEEL and ANL will pursue specific priorities. The third strategic thrust focuses on DOE's needs for clean, efficient, and renewable energy technology. As an initial effort, the INEEL will enhance its capability in biofuels, bioprocessing, and biochemicals. The content of this institutional plan is designed to meet basic DOE requirements for content and structure and reflect the key INEEL strategic thrusts. Updates to this institutional plan will offer additional content and resource refinements.

  6. Use of remote sensing technology for inventorying and planning utilization of land resources in South Dakota

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A project was undertaken in Meade County, South Dakota to provide (1) a general county-wide resource survey of land use and soils and (2) a detailed survey of land use for the environmentally sensitive area adjacent to the Black Hills. Imagery from LANDSAT-1 was visually interpreted to provide land use information and a general soils map. A detailed land use map for the Black Hills area was interpreted from RB-57 photographs and interpretations of soil characteristics were input into a computer data base and mapped. The detailed land use data were then used in conjunction with soil maps to provide information for the development of zoning ordinance maps and other land use planning in the Black Hills area. The use of photographs as base maps was also demonstrated. In addition, the use of airborne thermography to locate spoilage areas in sugar beet piles and to determine the apparent temperature of rooftops was evaluated.

  7. 78 FR 26067 - General Management Plan, Draft Environmental Impact Statement, Big Thicket National Preserve, Texas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... National Park Service General Management Plan, Draft Environmental Impact Statement, Big Thicket National... announces the availability of a Draft Environmental Impact Statement for the General Management Plan, Big... Environmental Impact Statement from the public for 60 days after the date the Environmental Protection...

  8. 78 FR 40425 - Draft Environmental Assessment for the J. Phil Campbell, Senior, Natural Resource Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-05

    ...; ] DEPARTMENT OF AGRICULTURE Draft Environmental Assessment for the J. Phil Campbell, Senior, Natural Resource... Environmental Assessment for the J. Phil Campbell, Senior, Natural Resource Conservation Center Land Transfer... of land at the J. Phil Campbell, Senior (JPC), Natural Resource Conservation Center (NRCC) from...

  9. Specialized Environmental Chamber Test Complex: User Test Planning Guide

    NASA Technical Reports Server (NTRS)

    Montz, Michael E.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Specialized Environmental Test Complex. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  10. Work plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Not Available

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  11. enviPath – The environmental contaminant biotransformation pathway resource

    PubMed Central

    Wicker, Jörg; Lorsbach, Tim; Gütlein, Martin; Schmid, Emanuel; Latino, Diogo; Kramer, Stefan; Fenner, Kathrin

    2016-01-01

    The University of Minnesota Biocatalysis/Biodegradation Database and Pathway Prediction System (UM-BBD/PPS) has been a unique resource covering microbial biotransformation pathways of primarily xenobiotic chemicals for over 15 years. This paper introduces the successor system, enviPath (The Environmental Contaminant Biotransformation Pathway Resource), which is a complete redesign and reimplementation of UM-BBD/PPS. enviPath uses the database from the UM-BBD/PPS as a basis, extends the use of this database, and allows users to include their own data to support multiple use cases. Relative reasoning is supported for the refinement of predictions and to allow its extensions in terms of previously published, but not implemented machine learning models. User access is simplified by providing a REST API that simplifies the inclusion of enviPath into existing workflows. An RDF database is used to enable simple integration with other databases. enviPath is publicly available at https://envipath.org with free and open access to its core data. PMID:26582924

  12. enviPath--The environmental contaminant biotransformation pathway resource.

    PubMed

    Wicker, Jörg; Lorsbach, Tim; Gütlein, Martin; Schmid, Emanuel; Latino, Diogo; Kramer, Stefan; Fenner, Kathrin

    2016-01-01

    The University of Minnesota Biocatalysis/Biodegradation Database and Pathway Prediction System (UM-BBD/PPS) has been a unique resource covering microbial biotransformation pathways of primarily xenobiotic chemicals for over 15 years. This paper introduces the successor system, enviPath (The Environmental Contaminant Biotransformation Pathway Resource), which is a complete redesign and reimplementation of UM-BBD/PPS. enviPath uses the database from the UM-BBD/PPS as a basis, extends the use of this database, and allows users to include their own data to support multiple use cases. Relative reasoning is supported for the refinement of predictions and to allow its extensions in terms of previously published, but not implemented machine learning models. User access is simplified by providing a REST API that simplifies the inclusion of enviPath into existing workflows. An RDF database is used to enable simple integration with other databases. enviPath is publicly available at https://envipath.org with free and open access to its core data. PMID:26582924

  13. Environmental Controls of Microbial Resource Partitioning in Soils

    NASA Astrophysics Data System (ADS)

    Kandeler, Ellen; Poll, Christian; Kramer, Susanne; Mueller, Karolin; Marhan, Sven

    2015-04-01

    The mineralization and flow of plant-derived carbon in soils is relevant to global carbon cycling. Current models of organismic carbon fluxes in soil assume that separate bacterial and fungal energy channels exist in soil. Recent studies disentangle the herbivore and detritivore pathways of microbial resource use, identify the key players contributing to these two different pathways, and determine to what extent microbial substrate use is affected by environmental controls. To follow the kinetics of litter and root decomposition and to quantify the contribution of key players, it is necessary to use isotopic approaches like PLFA-SIP and ergosterol-SIP. It was shown that bacteria and sugar consuming fungi initiated litter decomposition in an incubation experiment during the first two weeks, whereas higher fungi started to grow after the depletion of low molecular weight substrates. Analyses of PLFA-SIP revealed, for example, that fungi assimilated C directly from the litter, whereas bacteria took up substrates in the soil and therefore depended more on external transport processes than fungi. In addition, we will present data from a field experiment showing the incorporation of root and shoot litter C into organic and microbial C pools under field conditions over a period of two years. Similar amounts of C derived from the two resources differing in substrate quality and amount were incorporated into microbial C and ergosterol pools over time, indicating the importance of root-derived C for the soil food web. High incorporation of maize C (up to 76%) into ergosterol suggests fast and high assimilation of maize C into fungal biomass. Nevertheless, there is still a debate whether bacteria, archaea and fungi start feeding on new substrates at the same time or if their activity occurs at different successional stages. This presentation gives a summery of current knowledge on microbial resource partitioning under lab and field conditions.

  14. Environmental resources of selected areas of Hawaii: Geological hazards

    SciTech Connect

    Staub, W.P.; Reed, R.M.

    1995-03-01

    This report has been prepared to make available and archive the background scientific data and related information collected on geologic hazards during the preparation of the environmental impact statement (EIS) for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. The US Department of Energy (DOE) published a notice withdrawing its Notice of Intent to prepare the HGP-EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report presents a review of current information on geologic hazards in the Hawaiian Islands. Interrelationships among these hazards are discussed. Probabilities of occurrence of given geologic hazards are provided in various regions where sufficient geologic or historical data are available. Most of the information contained herein is compiled from recent US Geological Survey (USGS) publications and USGS open-file reports related to this project. This report describes the natural geologic hazards present in the area and does not represent an assessment of environmental impacts. Geologic hazards originate both onshore and offshore. Onshore geologic hazards such as volcanic eruptions, earthquakes, surface rupture, landslides, uplift and subsidence occur mainly on the southern third of the island of Hawaii (hereinafter referred to as Hawaii). Offshore geologic hazards are more widely distributed throughout the Hawaiian Islands. Examples of offshore geologic hazards are submarine landslides, turbidity currents, and seismic sea waves (tsunamis).

  15. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  16. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  17. Environmental assessment and planning at Mound - environmental monitoring capabilities and personnel profiles

    SciTech Connect

    1996-07-01

    Through its long experience with radioactive materials, Mound has developed a comprehensive, routine, offsite, environmental surveillance program to safeguard its employees, the physical plant, and the integrity of the surrounding environment from any potential adverse effects of its widely diverse operations. Effluent samples are analyzed for radiological and non-radiological parameters. The environment surrounding Mound Facility is continuously monitored - air, water, foodstuffs, vegetation, soil, and silt samples are analyzed to ensure that radioisotopic concentrations and other possible pollutants are well within the stringent standards adopted by the Department of Energy, the Environmental Protection Agencies (both federal and state), and various regional and local agencies. Moreover, this environmental surveillance program has been designed to ensure that the facility is designed, constructed, managed, operated, and maintained in a manner that continues to meet all federal, state, and local standards for environmental protection. Work in environmental science has been broadened to assess environmental factors associated with various aspects of the National Energy Plan. Both the management and staff at Mound have undertaken a firm commitment to make Mound`s environmental monitoring capabilities available to agencies that have the responsibility for the resolution of important environmental issues.

  18. Environmental monitoring plan, July 1--December 31, 1994

    SciTech Connect

    Not Available

    1994-07-01

    The Tennessee Department of Environment and Conservation, DOE Oversight Division (TDEC/DOE-O) under the terms of the Tennessee Oversight Agreement (TOA) are providing annual reports: reporting of State`s monitoring and analysis, and findings of DOE`s quality and effectiveness of DOE`s monitoring and surveillance. This report blends some of both of the required annual reports as described in the TOA section A.7.2.2. The Federal Facilities Agreement (FFA) integrates the Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for the Oak Ridge Reservation. This report presents the results of environmental monitoring in Tennessee in the following areas: surface waters; ground water; air; and fish and wildlife. In addition, radiation monitoring has been conducted in all of these areas.

  19. Demand-Side Management and Integrated Resource Planning: Findings from a Survey of 24 Electric Utilities

    SciTech Connect

    Schweitzer, M.

    1991-01-01

    Integrated resource planning differs from traditional utility planning practices primarily in its increased attention to demand-side management (DSM) programs and its integration of supply- and demand-side resources into a combined resource portfolio. This report details the findings from an Oak Ridge National Laboratory (ORNL) survey of 24 electric utilities that have well-developed integrated planning processes. These utilities account for roughly one-third of total capacity, electricity generation, and DSM-program expenditures nationwide. The ORNL survey was designed to obtain descriptive data on a national sample of utilities and to test a number of hypothesized relationships between selected utility characteristics and the mix of resources selected for the integrated plan, with an emphasis on the use of DSM resources and the processes by which they are chosen. The survey solicited information on each utility's current and projected resource mix, operating environment, procedures used to screen potential DSM resources, techniques used to obtain public input and to integrate supply- and demand-side options into a unified plan, and procedures used in the final selection of resources for the plan.

  20. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.