40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Contents 1.0Model Facility-Specific Response Plan 1.1Emergency Response Action Plan 1.2Facility.... EC01MR92.015 1.1Emergency Response Action Plan Several sections of the response plan shall be co-located... sections shall be called the Emergency Response Action Plan. The Agency intends that the Action Plan...
Interference due to shared features between action plans is influenced by working memory span.
Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M
2014-12-01
In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.
30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Your methods to implement your dispersant use plan and your in situ burning plan. ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What information must I include in the â... must I include in the “Emergency response action plan” section? The “Emergency response action plan...
40 CFR 265.224 - Response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... action plan. The response action plan must set forth the actions to be taken if the action leakage rate... paragraph (b) of this section. (b) If the flow rate into the leak detection system exceeds the action leakage rate for any sump, the owner or operator must: (1) Notify the Regional Administrator in writing of...
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.
Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.
30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?
Code of Federal Regulations, 2013 CFR
2013-07-01
... LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan” section is the core of the response plan. Put information in easy-to-use formats such...
30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FOR FACILITIES LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan”section is the core of the response plan. Put information in easy-to-use...
30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?
Code of Federal Regulations, 2014 CFR
2014-07-01
... LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan” section is the core of the response plan. Put information in easy-to-use formats such...
30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?
Code of Federal Regulations, 2012 CFR
2012-07-01
... LOCATED SEAWARD OF THE COAST LINE Oil-Spill Response Plans for Outer Continental Shelf Facilities § 254.23 What information must I include in the “Emergency response action plan” section? The “Emergency response action plan” section is the core of the response plan. Put information in easy-to-use formats such...
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode
Scheib, Jean P. P.; Stoll, Sarah; Thürmer, J. Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively. PMID:29593612
Thompson, Marcella R
2003-04-01
Fire safety is of paramount importance for everyone. In many workplaces, the occupational health nurse's scope of practice encompasses safety related activities. Included within this role is the responsibility for fire safety, emergency action, and fire prevention planning. The Three Rs of fire safety, emergency action, and fire prevention plans are rules, responsibilities, and resources. Myriad building and fire safety codes, regulations, and standards exist with which an employer must comply. An employer's responsibility for installing, testing, inspecting, and maintaining fire safety related equipment is extensive. Emergency action and fire prevention planning begins with conducting a detailed physical survey and preparing site maps. It includes making key policy decisions, writing procedures, and training employees in those procedures by practicing and executing site drills. The best resources available for emergency planning are the local fire department and the property insurer. Planning ahead means an efficient emergency response if disaster strikes. It saves lives, limits property damage, and preserves the environment.
Response to Request for Correction #10007
Response to the American Chemistry Council's Request for Correction #10007 that challenged the objectivity and utility of statements in the EPA Bisphenol A Action Plan and refusal to edit the EPA Bisphenol A Action Plan.
9 CFR 121.14 - Incident response. 11
Code of Federal Regulations, 2013 CFR
2013-01-01
... response plan. 12 The incident response plan must be coordinated with any entity-wide plans, kept in the... contacting APHIS. (b) The incident response plan must fully describe the entity's response procedures for the... actions to contain such agent or toxin. (c) The incident response plan must also contain the following...
Body posture modulates action perception.
Zimmermann, Marius; Toni, Ivan; de Lange, Floris P
2013-04-03
Recent studies have highlighted cognitive and neural similarities between planning and perceiving actions. Given that action planning involves a simulation of potential action plans that depends on the actor's body posture, we reasoned that perceiving actions may also be influenced by one's body posture. Here, we test whether and how this influence occurs by measuring behavioral and cerebral (fMRI) responses in human participants predicting goals of observed actions, while manipulating postural congruency between their own body posture and postures of the observed agents. Behaviorally, predicting action goals is facilitated when the body posture of the observer matches the posture achieved by the observed agent at the end of his action (action's goal posture). Cerebrally, this perceptual postural congruency effect modulates activity in a portion of the left intraparietal sulcus that has previously been shown to be involved in updating neural representations of one's own limb posture during action planning. This intraparietal area showed stronger responses when the goal posture of the observed action did not match the current body posture of the observer. These results add two novel elements to the notion that perceiving actions relies on the same predictive mechanism as planning actions. First, the predictions implemented by this mechanism are based on the current physical configuration of the body. Second, during both action planning and action observation, these predictions pertain to the goal state of the action.
36 CFR 906.5 - Administration of affirmative action plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility. (b...
36 CFR 906.5 - Administration of affirmative action plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.5 Administration of affirmative action plan. (a) The developer shall appoint an Affirmative Action Officer, and for projects exceeding $10 million in cost, the person appointed must have affirmative action as a primary responsibility. (b...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
Overlearned responses hinder S-R binding.
Moeller, Birte; Frings, Christian
2017-01-01
Two mechanisms that are important for human action control are the integration of individual action plans (see Hommel, Müsseler, Aschersleben, & Prinz, 2001) and the automatization of overlearned actions to familiar stimuli (see Logan, 1988). In the present study, we analyzed the influence of automatization on action plan integration. Integration with pronunciation responses were compared for response incompatible word and nonword stimuli. Stimulus-response binding effects were observed for nonwords. In contrast, words that automatically triggered an overlearned pronunciation response were not integrated with pronunciation of a different word. That is, automatized response retrieval hindered binding effects regarding the retrieving stimulus and a new response. The results are a first indication of the way that binding and learning processes interact, and might also be a first step to understanding the more complex interdependency of the processes responsible for stimulus-response binding in action control and stimulus-response associations in learning research. (PsycINFO Database Record (c) 2016 APA, all rights reserved).
Code of Federal Regulations, 2014 CFR
2014-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Function FCO—Federal Coordinating Officer FRERP—Federal Radiological Emergency Response Plan FRP—Federal Response Plan FS—Feasibility Study HRS—Hazard Ranking System LEPC—Local Emergency Planning Committee NCP... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Control over Conflict during Movement Preparation: Role of Posterior Parietal Cortex
Coulthard, Elizabeth J.; Nachev, Parashkev; Husain, Masud
2008-01-01
Summary Flexible behavior in humans often requires that rapid choices be made between conflicting action plans. Although much attention has focused on prefrontal regions, little is understood about the contribution of parietal cortex under situations of response conflict. Here we show that right parietal damage associated with spatial neglect leads to paradoxical facilitation (speeding) of rightward movements in the presence of conflicting leftward response plans. These findings indicate a critical role for parietal regions in action planning when there is response competition. In contrast, patients with prefrontal damage have an augmented cost of conflict for both leftward and rightward movements. The results suggest involvement of two independent systems in situations of response conflict, with right parietal cortex being a crucial site for automatic activation of competing motor plans and prefrontal regions acting independently to inhibit action plans irrelevant to current task goals. PMID:18400170
What contributes to action plan enactment? Examining characteristics of physical activity plans.
Fleig, Lena; Gardner, Benjamin; Keller, Jan; Lippke, Sonia; Pomp, Sarah; Wiedemann, Amelie U
2017-11-01
Individuals with chronic conditions can benefit from formulating action plans to engage in regular physical activity. However, the content and the successful translation of plans into action, so-called plan enactment, are rarely adequately evaluated. The aim of this study was to describe the content of user-specified plans and to examine whether participants were more likely to enact their plans if these plans were highly specific, viable, and instrumental. The study presents secondary analyses from a larger behavioural intervention in cardiac and orthopaedic rehabilitation. The content of 619 action plans from 229 participants was evaluated by two independent raters (i.e., qualitative analyses and ratings of specificity) and by participants themselves (i.e., instrumentality and viability). Plan enactment was also measured via self-reports. Multilevel analyses examined the relationship between these plan characteristics and subsequent plan enactment, and between plan enactment and aggregated physical activity. Participants preferred to plan leisure-time physical activities anchored around time-based cues. Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Interestingly, individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Plan enactment was positively associated with aggregated behaviour. Interventions should not only emphasize the importance of planning, but also the benefits of formulating specific contextual cues. Planning of the behavioural response seems to require less precision. Allowing for some flexibility in executing the anticipated target behaviour seems to aid successful plan enactment. Statement of Contribution What is already known on this subject? Action planning interventions are efficacious in promoting health behaviour. Characteristics of plan content (i.e., specificity) matter for unconditional behaviour change. Plan enactment (i.e., degree to which plan is followed through) is positively linked to behaviour change. What does this study add? Specificity of occasion cues (i.e., when to act) and highly instrumental plans were positively associated with plan enactment. Individuals who planned less specific behavioural responses (i.e., what to do) were more likely to enact their plans. Planning interventions should focus on specificity of context cues but flexibility of behavioural action. © 2017 The British Psychological Society.
75 FR 55973 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... the vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil... Marine Firefighting Requirements; Vessel Response Plans for Oil'' (73 FR 80618). The final rule amended...
78 FR 19709 - Agency Information Collection Activities; Proposed Collection; Public Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-02
... Request Title: Evaluation of Implementation of the Viral Hepatitis Action Plan. Abstract: In response to the viral hepatitis epidemic in the United States, the Department of Health and Human Services (HHS) released the Action Plan for the Prevention, Care, and Treatment of Viral Hepatitis (Action Plan) in May...
Do Endogenous and Exogenous Action Control Compete for Perception?
ERIC Educational Resources Information Center
Pfister, Roland; Heinemann, Alexander; Kiesel, Andrea; Thomaschke, Roland; Janczyk, Markus
2012-01-01
Human actions are guided either by endogenous action plans or by external stimuli in the environment. These two types of action control seem to be mediated by neurophysiologically and functionally distinct systems that interfere if an endogenously planned action suddenly has to be performed in response to an exogenous stimulus. In this case, the…
18 CFR 12.22 - Contents of emergency action plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... plans for notifying potentially affected persons, appropriate Federal, state, and local agencies... nuclear power plants—1) Radiological response plan. If the personnel operating any powerhouse or any...
18 CFR 12.22 - Contents of emergency action plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... plans for notifying potentially affected persons, appropriate Federal, state, and local agencies... nuclear power plants—1) Radiological response plan. If the personnel operating any powerhouse or any...
18 CFR 12.22 - Contents of emergency action plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... plans for notifying potentially affected persons, appropriate Federal, state, and local agencies... nuclear power plants—1) Radiological response plan. If the personnel operating any powerhouse or any...
18 CFR 12.22 - Contents of emergency action plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... action plan. 12.22 Section 12.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... plans for notifying potentially affected persons, appropriate Federal, state, and local agencies... nuclear power plants—1) Radiological response plan. If the personnel operating any powerhouse or any...
The Simon effect in action: planning and/or on-line control effects?
Scorolli, Claudia; Pellicano, Antonello; Nicoletti, Roberto; Rubichi, Sandro; Castiello, Umberto
2015-07-01
Choice reaction tasks are performed faster when stimulus location corresponds to response location (Simon effect). This spatial stimulus-response compatibility effect affects performance at the level of action planning and execution. However, when response selection is completed before movement initiation, the Simon effect arises only at the planning level. The aim of this study was to ascertain whether when a precocious response selection is requested, the Simon effect can be detected on the kinematics characterizing the online control phase of a non-ballistic movement. Participants were presented with red or green colored squares, which could appear on the right, left, above, or below a central cross. Depending on the square's color, participants had to release one of two buttons (right/left), then reach toward and press a corresponding lateral pad. We found evidence of the Simon effect on both action planning and on-line control. Moreover, the investigation of response conflict at the level of previous trials (i.e., n-1), a factor that might determine interference at the level of the current response, revealed a conflict adaptation process across trials. Results are discussed in terms of current theories concerned with the Simon effect and the distinction between action planning and control. Copyright © 2014 Cognitive Science Society, Inc.
40 CFR 265.259 - Response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... response action plan must set forth the actions to be taken if the action leakage rate has been exceeded... section. (b) If the flow rate into the leak determination system exceeds the action leakage rate for any... notification that the action leakage rate has been exceeded, submit to the Regional Administrator the results...
75 FR 54026 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil. The... establish evidence that they have properly planned to mitigate oil outflow and to provide that information...
40 CFR 265.303 - Response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... section. (b) If the flow rate into the leak detection system exceeds the action leakage rate for any sump... response action plan must set forth the actions to be taken if the action leakage rate has been exceeded... notification that the action leakage rate has been exceeded, submit to the Regional Administrator the results...
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2012 CFR
2012-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2013 CFR
2013-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
Transfusion service disaster planning.
Bundy, K L; Foss, M L; Stubbs, J R
2008-01-01
The Mayo Clinic, in Rochester, Minnesota, recently set forth a directive to develop a Mayo Emergency Incident Command System (MEICS) plan to respond to major disasters. The MEICS plan that was developed interfaces with national response plans to ensure effective communication and coordination between our institution and local, state, and federal agencies to establish a common language and communication structure. The MEICS plan addresses multiple aspects of dealing with resource needs during a crisis, including the need for blood and transfusion medicine services. The MEICS plan was developed to supplement our current local emergency preparedness procedures and provide a mechanism for responding to the escalating severity of an emergency to deal with situations of a magnitude that is outside the normal experience. A plan was developed to interface the existing Transfusion Medicine disaster plan standard operating procedures (SOP) with the institutional and Department of Laboratory Medicine (DLMP) MEICS plans. The first step in developing this interface was defining MEICS. Other major steps were defining the chain of command, developing a method for visually indicating who is "in charge," planning communication, defining the actions to be taken, assessing resource needs, developing flowcharts and updating SOPs, and developing a blood rationing team to deal with anticipated blood shortages. Several key features of the interface and updated disaster plan that were developed are calling trees for response personnel, plans for relocating leadership to alternative command centers, and action sheets to assist with resource assessment. The action sheets also provide documentation of key actions by response personnel.
Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berg, K.
1994-09-01
To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
29 CFR 1918.100 - Emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... times: (i) Initially when the plan is developed; (ii) Whenever the employee's responsibilities or...
ERIC Educational Resources Information Center
Wiediger, Matthew D.; Fournier, Lisa R.
2008-01-01
Withholding an action plan in memory for later execution can delay execution of another action, if the actions share a similar (compatible) action feature (i.e., response hand). This phenomenon, termed compatibility interference (CI), was found for identity-based actions that do not require visual guidance. The authors examined whether CI can…
40 CFR 77.4 - Administrator's action on proposed offset plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...
40 CFR 77.4 - Administrator's action on proposed offset plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...
40 CFR 77.4 - Administrator's action on proposed offset plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...
40 CFR 77.4 - Administrator's action on proposed offset plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... representative. The Administrator will also give notice of any approval in the Federal Register. The plans will... response to public comments submitted on the draft offset plan or disapproval of a draft offset plan... offset plan. The Administrator will serve a copy of any approved offset plan and the response to comments...
Affirmative Action Employment Plan. Revised.
ERIC Educational Resources Information Center
Oakland Unified School District, CA.
This is the affirmative action employment plan adopted by the Board of Education of the Oakland Unified School District, Oakland, California. A statement of school district policy and goals is provided. Responsibilities of the school district administrators and the Affirmative Action Advisory Committee are also outlined. Steps to be taken to…
36 CFR 219.6 - Proposed actions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Proposed actions. 219.6... actions. (a) Proposal. The responsible official may propose to amend or revise a plan, propose a site-specific action, or both. (b) NEPA requirements. Unless otherwise provided by law, the responsible official...
40 CFR 300.415 - Removal action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Removal action. 300.415 Section 300... PLAN Hazardous Substance Response § 300.415 Removal action. (a)(1) In determining the appropriate extent of action to be taken in response to a given release, the lead agency shall first review the...
78 FR 10619 - Agency Information Collection Activities; Proposed Collection; Public Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-14
... reference. Information Collection Request Title: Evaluation of Implementation of the Viral Hepatitis Action Plan. Abstract: In response to the viral hepatitis epidemic in the United States, the Department of... Hepatitis (Action Plan) in May 2011 to provide a comprehensive strategic plan to address viral hepatitis B...
78 FR 4146 - Agency Information Collection Activities; Proposed Collection; Public Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... reference. Information Collection Request Title: Evaluation of Implementation of the Viral Hepatitis Action Plan. Abstract: In response to the viral hepatitis epidemic in the United States, the Department of... Hepatitis (Action Plan) in May 2011 to provide a comprehensive strategic plan to address viral hepatitis B...
DOD Product Support Business Case Analysis Guidebook
2011-04-01
Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan
40 CFR 300.800 - Establishment of an administrative record.
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...
40 CFR 300.800 - Establishment of an administrative record.
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...
40 CFR 300.800 - Establishment of an administrative record.
Code of Federal Regulations, 2014 CFR
2014-07-01
... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...
40 CFR 300.800 - Establishment of an administrative record.
Code of Federal Regulations, 2012 CFR
2012-07-01
... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...
40 CFR 300.800 - Establishment of an administrative record.
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...
I Plan Therefore I Choose: Free-Choice Bias Due to Prior Action-Probability but Not Action-Value
Suriya-Arunroj, Lalitta; Gail, Alexander
2015-01-01
According to an emerging view, decision-making, and motor planning are tightly entangled at the level of neural processing. Choice is influenced not only by the values associated with different options, but also biased by other factors. Here we test the hypothesis that preliminary action planning can induce choice biases gradually and independently of objective value when planning overlaps with one of the potential action alternatives. Subjects performed center-out reaches obeying either a clockwise or counterclockwise cue-response rule in two tasks. In the probabilistic task, a pre-cue indicated the probability of each of the two potential rules to become valid. When the subsequent rule-cue unambiguously indicated which of the pre-cued rules was actually valid (instructed trials), subjects responded faster to rules pre-cued with higher probability. When subjects were allowed to choose freely between two equally rewarded rules (choice trials) they chose the originally more likely rule more often and faster, despite the lack of an objective advantage in selecting this target. In the amount task, the pre-cue indicated the amount of potential reward associated with each rule. Subjects responded faster to rules pre-cued with higher reward amount in instructed trials of the amount task, equivalent to the more likely rule in the probabilistic task. Yet, in contrast, subjects showed hardly any choice bias and no increase in response speed in favor of the original high-reward target in the choice trials of the amount task. We conclude that free-choice behavior is robustly biased when predictability encourages the planning of one of the potential responses, while prior reward expectations without action planning do not induce such strong bias. Our results provide behavioral evidence for distinct contributions of expected value and action planning in decision-making and a tight interdependence of motor planning and action selection, supporting the idea that the underlying neural mechanisms overlap. PMID:26635565
Adaptive management: a paradigm for remediation of public facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B
2009-01-01
Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
... supportive of its application, plan or plan amendment; and (2) A written response to each ground for... the application, plan, or plan amendment as well as the Tribe or Tribal organization's response. The... disapproval of a Tribal IV-D application, plan or plan amendment by filing a written Request for...
Code of Federal Regulations, 2011 CFR
2011-10-01
... supportive of its application, plan or plan amendment; and (2) A written response to each ground for... the application, plan, or plan amendment as well as the Tribe or Tribal organization's response. The... disapproval of a Tribal IV-D application, plan or plan amendment by filing a written Request for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... supportive of its application, plan or plan amendment; and (2) A written response to each ground for... the application, plan, or plan amendment as well as the Tribe or Tribal organization's response. The... disapproval of a Tribal IV-D application, plan or plan amendment by filing a written Request for...
U.S. Draft Domestic Action Plan for Lake Erie
In 2016, in response to the 2012 Great Lakes Water Quality Agreement commitments, Canada and the U.S. adopted phosphorus reduction targets for Lake Erie. Each country is developing domestic action plans which outline strategies for meeting the new targets.
40 CFR 300.150 - Worker health and safety.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Worker health and safety. 300.150... PLAN Responsibility and Organization for Response § 300.150 Worker health and safety. (a) Response actions under the NCP will comply with the provisions for response action worker safety and health in 29...
40 CFR 300.150 - Worker health and safety.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Worker health and safety. 300.150... PLAN Responsibility and Organization for Response § 300.150 Worker health and safety. (a) Response actions under the NCP will comply with the provisions for response action worker safety and health in 29...
40 CFR 300.150 - Worker health and safety.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Worker health and safety. 300.150... PLAN Responsibility and Organization for Response § 300.150 Worker health and safety. (a) Response actions under the NCP will comply with the provisions for response action worker safety and health in 29...
40 CFR 300.150 - Worker health and safety.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Worker health and safety. 300.150... PLAN Responsibility and Organization for Response § 300.150 Worker health and safety. (a) Response actions under the NCP will comply with the provisions for response action worker safety and health in 29...
40 CFR 300.150 - Worker health and safety.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Worker health and safety. 300.150... PLAN Responsibility and Organization for Response § 300.150 Worker health and safety. (a) Response actions under the NCP will comply with the provisions for response action worker safety and health in 29...
40 CFR 109.4 - Relationship to Federal response actions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Federal response actions. The National Oil and Hazardous Materials Pollution Contingency Plan provides... 40 Protection of Environment 23 2013-07-01 2013-07-01 false Relationship to Federal response... commander will take control of the response activity in accordance with section 11(c)(1) of the Federal Act. ...
40 CFR 109.4 - Relationship to Federal response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Federal response actions. The National Oil and Hazardous Materials Pollution Contingency Plan provides... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Relationship to Federal response... commander will take control of the response activity in accordance with section 11(c)(1) of the Federal Act. ...
40 CFR 109.4 - Relationship to Federal response actions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Federal response actions. The National Oil and Hazardous Materials Pollution Contingency Plan provides... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Relationship to Federal response... commander will take control of the response activity in accordance with section 11(c)(1) of the Federal Act. ...
40 CFR 109.4 - Relationship to Federal response actions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Federal response actions. The National Oil and Hazardous Materials Pollution Contingency Plan provides... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Relationship to Federal response... commander will take control of the response activity in accordance with section 11(c)(1) of the Federal Act. ...
40 CFR 109.4 - Relationship to Federal response actions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Federal response actions. The National Oil and Hazardous Materials Pollution Contingency Plan provides... 40 Protection of Environment 22 2014-07-01 2013-07-01 true Relationship to Federal response... commander will take control of the response activity in accordance with section 11(c)(1) of the Federal Act. ...
Final consolidated action plan to Tiger Team. Volume 1, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
Final consolidated action plan to Tiger Team. Volume 2, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
Hafertepe, E C
1987-01-01
The Sisters of Charity Health Care System (SCHCS), Inc., Cincinnati, undertook a systemwide board evaluation project to support and enhance effective aspects of governance and to deal with obstacles that often arise due to differing beliefs and role confusion. A task force of chief executive officers developed the questionnaire, which was then administered to members of individual facilities' boards and the system's board. The documented highlighted value issues important to SCHCS's ministry and business activities: overall board responsibilities, financial responsibilities, strategic planning, the board's role, committee structures, the board's operating process, board education, and overall board effectiveness. The responses from each member were returned to the local boards, who analyzed them and developed an action plan. A summary of each facility's responses and action plans were forwarded to the system's corporate office. The CEO committee critiqued the process and reported on significant issues and action plans. In general, survey results revealed a strong influence of mission and philosophy in decision making, support for current processes, and effective interaction among board members. The system's corporate office will use the responses to respond to a dynamic environment and strengthen their role in the delivery of Catholic health care services.
Fournier, Lisa Renee; Wiediger, Matthew D; McMeans, Ryan; Mattson, Paul S; Kirkwood, Joy; Herzog, Theibot
2010-07-01
Holding an action plan in memory for later execution can delay execution of another action if the actions share a similar (compatible) feature. This compatibility interference (CI) occurs for actions that share the same response modality (e.g., manual response). We investigated whether CI can generalize to actions that utilize different response modalities (manual and vocal). In three experiments, participants planned and withheld a sequence of key-presses with the left- or right-hand based on the visual identity of the first stimulus, and then immediately executed a speeded, vocal response ('left' or 'right') to a second visual stimulus. The vocal response was based on discriminating stimulus color (Experiment 1), reading a written word (Experiment 2), or reporting the antonym of a written word (Experiment 3). Results showed that CI occurred when the manual response hand (e.g., left) was compatible with the identity of the vocal response (e.g., 'left') in Experiment 1 and 3, but not in Experiment 2. This suggests that partial overlap of semantic codes is sufficient to obtain CI unless the intervening action can be accessed automatically (Experiment 2). These findings are consistent with the code occupation hypothesis and the general framework of the theory of event coding (Behav Brain Sci 24:849-878, 2001a; Behav Brain Sci 24:910-937, 2001b).
Reducing the Consequences of a Nuclear Detonation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buddemeier, B R
2007-11-09
The 2002 National Strategy to Combat Weapons of Mass Destruction states that 'the United States must be prepared to respond to the use of WMD against our citizens, our military forces, and those of friends and allies'. Scenario No.1 of the 15 Department of Homeland Security national planning scenarios is an improvised nuclear detonation in the national capitol region. An effective response involves managing large-scale incident response, mass casualty, mass evacuation, and mass decontamination issues. Preparedness planning activities based on this scenario provided difficult challenges in time critical decision making and managing a large number of casualties within the hazardmore » area. Perhaps even more challenging is the need to coordinate a large scale response across multiple jurisdictions and effectively responding with limited infrastructure and resources. Federal response planning continues to make improvements in coordination and recommending protective actions, but much work remains. The most critical life-saving activity depends on actions taken in the first few minutes and hours of an event. The most effective way to reduce the enormous national and international social and economic disruptions from a domestic nuclear explosion is through planning and rapid action, from the individual to the federal response. Anticipating response resources for survivors based on predicted types and distributions of injuries needs to be addressed.« less
Foreign Affairs: Specific Action Plan Needed to Improve Response to Parental Child Abductions
2000-03-01
the child or prejudice to interested parties; (3) secure the voluntary return of the child or to bring about an amicable resolution of the issues, and...FOREIGN AFFAIRS Specific Action Plan Needed to Improve Response to Parental Child Abductions DISTRIBUTION STATEMENT A Approved for Public Release...International Parental Child Abduction 17 Page 1 GAO/NSIAD-00-10 Parental Child Abduction Page 2 GAO/NSIAD-00-10 Parental Child Abduction GAP
HiTEC: a connectionist model of the interaction between perception and action planning.
Haazebroek, Pascal; Raffone, Antonino; Hommel, Bernhard
2017-11-01
Increasing evidence suggests that perception and action planning do not represent separable stages of a unidirectional processing sequence, but rather emerging properties of highly interactive processes. To capture these characteristics of the human cognitive system, we have developed a connectionist model of the interaction between perception and action planning: HiTEC, based on the Theory of Event Coding (Hommel et al. in Behav Brain Sci 24:849-937, 2001). The model is characterized by representations at multiple levels and by shared representations and processes. It complements available models of stimulus-response translation by providing a rationale for (1) how situation-specific meanings of motor actions emerge, (2) how and why some aspects of stimulus-response translation occur automatically and (3) how task demands modulate sensorimotor processing. The model is demonstrated to provide a unitary account and simulation of a number of key findings with multiple experimental paradigms on the interaction between perception and action such as the Simon effect, its inversion (Hommel in Psychol Res 55:270-279, 1993), and action-effect learning.
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 4 2014-10-01 2014-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 4 2012-10-01 2012-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 4 2013-10-01 2013-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
42 CFR 456.407 - UR responsibilities of administrative staff.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false UR responsibilities of administrative staff. 456... administrative staff. The UR plan must describe— (a) The UR support responsibilities of the ICF's administrative staff; and (b) Procedures used by the staff for taking needed corrective action. UR Plan: Informational...
Initiating an Action Research Programme for University EFL Teachers: Early Experiences and Responses
ERIC Educational Resources Information Center
Burns, Anne; Westmacott, Anne; Ferrer, Antonieta Hidalgo
2016-01-01
Accounts of how teacher educators begin to plan, develop, and support action research programmes for language teachers are rare, as are descriptions of the responses of the teachers who participate. This article documents and analyses the initial processes of introducing and supporting a new programme of action research for language teachers at…
Guo, Yuqi; Sims, Omar T
2017-02-17
Hepatitis C virus (HCV) kills 366,000 people worldwide and 17,000 people in the United States each year. In 2011, the U.S. Department of Health and Human Services (HHS) published a national viral hepatitis action plan to control and combat HCV in the United States. This article provides a brief update of HCV health policy developments that have emerged since publication of HHS's national viral hepatitis action plan and concludes with a discussion of the public health impact of these recent HCV health policy developments.
Advancing Medication Safety: Establishing a National Action Plan for Adverse Drug Event Prevention.
Harris, Yael; Hu, Dale J; Lee, Christine; Mistry, Mishale; York, Andrew; Johnson, Tisha K
2015-08-01
Adverse drug events (ADEs) are important contributors to preventable morbidity and mortality, comprising one third of all hospital adverse events. In response to growing evidence detailing the high prevalence of ADEs, particularly among vulnerable older adults, Congress requested that the Secretary of the Department of Health and Human Services (HHS) convene a Federal Interagency Steering Committee to establish a National Action Plan to focus on ADE prevention. In August 2014, the Office of Disease Prevention and Health Promotion released the final version of the National Action Plan for Adverse Drug Event Prevention. The Action Plan directly supports the goals of the HHS Strategic Plan and the Patient Protection and Affordable Care Act by providing guidance on tracking and preventing ADEs, as well as describing evidence-based tools and resources to enhance medication safety. ADE ACTION PLAN CONTENT: The Federal Interagency Steering Committee focused the Action Plan on ADEs that are clinically significant, account for the greatest number of measurable harms as identified by using existing surveillance tools, and are largely preventable. As such, the decision was made to target three medication classes: anticoagulants, diabetes agents (insulin and oral hypoglycemic agents), and opioids. The Action Plan is organized around four key areas: surveillance; evidence-based prevention; payment, policy incentives, and oversight; and research opportunities to advance medication safety. One measure of the ADE Action Plan's success will be the wider dissemination of information and educational resources to providers and patients (or consumers) regarding the risks associated with medications. Future Action Plan iterations are likely to consider other high-priority medication classes and update the recommendations.
Interaction in planning movement direction for articulatory gestures and manual actions.
Vainio, Lari; Tiainen, Mikko; Tiippana, Kaisa; Komeilipoor, Naeem; Vainio, Martti
2015-10-01
Some theories concerning speech mechanisms assume that overlapping representations are involved in programming certain articulatory gestures and hand actions. The present study investigated whether planning of movement direction for articulatory gestures and manual actions could interact. The participants were presented with written vowels (Experiment 1) or syllables (Experiment 2) that were associated with forward or backward movement of tongue (e.g., [i] vs. [ɑ] or [te] vs. [ke], respectively). They were required to pronounce the speech unit and simultaneously move the joystick forward or backward according to the color of the stimulus. Manual and vocal responses were performed relatively rapidly when the articulation and the hand action required movement into the same direction. The study suggests that planning horizontal tongue movements for articulation shares overlapping neural mechanisms with planning horizontal movement direction of hand actions.
40 CFR 264.223 - Response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) If the flow rate into the leak detection system exceeds the action leakage rate for any sump, the... action plan must set forth the actions to be taken if the action leakage rate has been exceeded. At a... action leakage rate has been exceeded, submit to the Regional Administrator the results of the analyses...
Do endogenous and exogenous action control compete for perception?
Pfister, Roland; Heinemann, Alexander; Kiesel, Andrea; Thomaschke, Roland; Janczyk, Markus
2012-04-01
Human actions are guided either by endogenous action plans or by external stimuli in the environment. These two types of action control seem to be mediated by neurophysiologically and functionally distinct systems that interfere if an endogenously planned action suddenly has to be performed in response to an exogenous stimulus. In this case, the endogenous representation has to be deactivated first to give way to the exogenous system. Here we show that interference of endogenous and exogenous action control is not limited to motor-related aspects but also affects the perception of action-related stimuli. Participants associated two actions with contingent sensory effects in learning blocks. In subsequent test blocks, preparing one of these actions specifically impaired responding to the associated effect in an exogenous speeded detection task, yielding a blindness-like effect for arbitrary, learned action effects. In accordance with the theory of event coding, this finding suggests that action planning influences perception even in the absence of any physical similarities between action and to-be-perceived stimuli.
Person-Centered Transition Planning.
ERIC Educational Resources Information Center
Miner, Craig A.; Bates, Paul E.
1997-01-01
Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…
33 CFR 155.1035 - Response plan requirements for manned vessels carrying oil as a primary cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... be used to manage the response actions. This structure must include the following functional areas and must further include information for key components within each functional area: (i) Command and... operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The responsibilities of, duties...
33 CFR 155.1035 - Response plan requirements for manned vessels carrying oil as a primary cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... be used to manage the response actions. This structure must include the following functional areas and must further include information for key components within each functional area: (i) Command and... operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The responsibilities of, duties...
33 CFR 155.1035 - Response plan requirements for manned vessels carrying oil as a primary cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... be used to manage the response actions. This structure must include the following functional areas and must further include information for key components within each functional area: (i) Command and... operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The responsibilities of, duties...
33 CFR 155.1035 - Response plan requirements for manned vessels carrying oil as a primary cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... be used to manage the response actions. This structure must include the following functional areas and must further include information for key components within each functional area: (i) Command and... operations; (vi) Planning; (vii) Logistics support; and (viii) Finance. (5) The responsibilities of, duties...
The Austrian radon activities on the way to the national radon action plan.
Gruber, V; Ringer, W; Wurm, G; Haider, W
2014-07-01
Based on the new Euratom Basic Safety Standards (BSS), all EU member states will be obliged to design a strategy to address long-term risks from radon exposure, which is laid down in the 'national radon action plan'. In Austria, the National Radon Centre is responsible for the development of the action plan. This paper presents the current and planned radon protection activities on the way to establish the radon action plan--like the national radon database, the definition of radon risk areas by improving the existing radon map, as well as strategies and activities to increase the radon awareness of the public and decision-makers and to involve the building sector. The impact of and the need for actions caused by the BSS requirements on the Austrian radon legislation, strategy and programme are discussed. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-03
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Resource Management Plan/General Plan Draft... Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...
48 CFR 705.207 - Preparation and transmittal of certain synopses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERNATIONAL DEVELOPMENT ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 705.207 Preparation and transmittal of certain synopses. The responsible contracting officer shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... acres of pine stands using a variety of methods to treat MPB infested stands, reduce the overall density... actions proposed are in direct response to management direction provided by the Black Hills National Forest Land and Resource Management Plan (Forest Plan). The site specific actions are designed, based on...
Viewing Objects and Planning Actions: On the Potentiation of Grasping Behaviours by Visual Objects
ERIC Educational Resources Information Center
Makris, Stergios; Hadar, Aviad A.; Yarrow, Kielan
2011-01-01
How do humans interact with tools? Gibson (1979) suggested that humans perceive directly what tools afford in terms of meaningful actions. This "affordances" hypothesis implies that visual objects can potentiate motor responses even in the absence of an intention to act. Here we explore the temporal evolution of motor plans afforded by common…
9 CFR 417.3 - Corrective actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Corrective actions. 417.3 Section 417... ANALYSIS AND CRITICAL CONTROL POINT (HACCP) SYSTEMS § 417.3 Corrective actions. (a) The written HACCP plan shall identify the corrective action to be followed in response to a deviation from a critical limit...
42 CFR 51.10 - Remedial actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false Remedial actions. 51.10 Section 51.10 Public Health... actions. Failure to submit an annual report in the designated format on time or to submit requested information and documentation, corrective action plans and ongoing implementation status reports in response...
NASA Astrophysics Data System (ADS)
Papanikolaou, Dimitrios; Arvanitakis, Spyridon; Papanikolaou, , Ioannis; Lozios, Stylianos; Diakakis, Michalis; Deligiannakis, Georgios; Dimitropoulou, Margarita; Georgiou, Konstantinos
2013-04-01
Wildfires are a major hazard in Greece suffering on average 1,509 wildfires and 36,151 burned hectares of forestlands every year. Since 1998 the Greek Fire Service is responsible for wildfires suppression and response, while prevention and mitigation yearly directives are also being released by the General Secretariat of Civil Protection. The 3013/2002 Act introduced a major transfer of responsibilities from the national to local municipal and regional authorities, which are accompanied by supplementary financial support. Significant new features were established such as the operation of local coordination councils, the foundation of municipality civil protection offices, the establishment of the annually prevention planning for forest fires and the development of local action plans. The University of Athens has developed a Local Action Plan template for municipality administrative levels, integrating scientific techniques and technologies to public government management. The Local Action Plan for Forest Fire Prevention is the main handbook and primary tool of every municipality for reducing the risk of wildfires. Fire prevention and risk analysis are the principal aims of this Plan, which also emphasizes on the important role of the volunteer organizations on forest fire prevention. The 7 chapters of the Action Plan include the legal framework, the risk analysis parameters, the risk analysis using GIS, the prevention planning, the manpower and available equipment of services involved, along with operational planning and evaluation of the previous year's forest fire prevention actions. Multiple information layers, such as vegetation types, road network, power lines and landfills are combined in GIS environment and transformed into qualitative multiparameter as well as quantitative combinational fire hazard maps. These maps are essential in wildfire risk analysis as they display the areas that need the highest attention during the fire season. Moreover, the separate steps of operational planning and the reviewing of precaution, addressing and rehabilitation measures are analyzed. This action plan, risk analysis and maps are of decisive importance not only for prevention and operational planning purposes, but can also prove useful during the crisis and the rehabilitation processes as well. Additionally, we conducted a large questionnaire survey among the municipalities of Greece to assess the existing situation regarding forest fire prevention. Therefore, a network connecting civil protection departments of municipalities was developed, based on an Internet platform, which acted also as a communication tool. Overall, we had feedback either online or offline from 125 municipalities across the country (representing more than one/third of the total municipalities of Greece). 23% of the municipalities have not compiled an action plan yet despite the fact that the 3013/2002 Act of the Greek National Law requires one. Moreover, existing action plans are predominantly catalogues and tables of information regarding authorised personnel and equipment. They lack important information, present no spatial data and display no prevention measures. Indeed, 85% of the municipalities that have action plans do not use risk maps and spatial data, which are of decisive importance for compiling the plans. 74% of the municipalities do not keep a record of forest fires. The jurisdiction area has been modified after the new administrative plan of Kallikratis in 2010 in 74% of the municipalities, however, local action plans were not adapted accordingly in 61% of these. The daily Fire Risk Map of the General Secretariat of Civil Protection has a key role, since 77% of the municipalities take additional measures in case of increased fire risk. According to the civil protection officials, existing action plans suffer from several major problems which emerge due to the fact: that there is no assessment on the fire hazard 67%, there is lack of personnel training 65%, new technologies are not incorporated or used 57% and there is a lack of a template for compiling an action plan 53%. The partnership between the University of Athens with the support of the private sector and the Union of Municipalities of Attica was held under the LIFE+ project "Local Authorities Alliance for Forest Fire Prevention - LIFE08/ENV/GR/000553 " which is implemented with the contribution of the LIFE financial instrument of the European Community.
2007-08-01
example, the topic of massively multiplayer online role playing games ( MMORPGs ). (A related class of first person multiplayer shooters includes...key and measurable indicators that require immediate action. They develop plans of action for these trigger points to avoid premature commitment of...recognize that the cause of the incident may be an accident or act of nature, or it may be either criminal or terrorist activity. They avoid the
ERIC Educational Resources Information Center
Rogow, Sally M.
1983-01-01
Social routines, which combined nursery rhymes with carefully planned action sequences, were used to help two young developmentally delayed, visually handicapped children acquire communicative responses. Midway through the 3-year project, one child responded to words for objects, people, and actions. (Author/SEW)
MO-G-BRE-02: A Survey of IMRT QA Practices for More Than 800 Institutions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pulliam, K; Kerns, J; Howell, R
Purpose: A wide range of techniques and measurement devices are employed for IMRT QA, causing a large variation of accepted action limits and potential follow up for failing plans. Such procedures are not well established or accepted in the medical physics community. To achieve the goal of proving insight into current IMRT QA practices, we created an electronic IMRT QA survey. The survey was open to a variety of the most common QA devices and assessed the type of comparison to measurement, action limits, delivery methods, and clinical action for failing QA plans. Methods: We conducted an online survey throughmore » the Radiological Physics Center's (RPC) annual survey with the goal of ascertaining elements of routine patient-specific IMRT QA. A total of 874 institutions responded to the survey. The questions ranged from asking for action limits, dosimeter type(s) used, delivery techniques, and actions taken when a plan fails IMRT QA. Results: The most common (52%) planar gamma criteria was 3%/3 mm with a 95% of pixels passing criteria. The most common QA device were diode arrays (48%). The most common first response to a plan failing QA was to re-measure at the same point the point dose (89%), second was to re-measure at a new point (13%), and third was to analyze the plan in relative instead of absolute mode (10%) (Does not add to 100% as not all institutions placed a response for each QA follow-up option). Some institutions, however, claimed that they had never observed a plan failure. Conclusion: The survey provided insights into the way the community currently performs IMRT QA. This information will help in the push to standardize action limits among dosimeters.« less
The Greater Southern Area Health Service Tobacco Control Plan 2006-2009.
Gow, Andrew J; Weir, Kylie M; Marich, Andrew J N
2008-01-01
In response to the NSW Tobacco Action Plan 2005-2009, Greater Southern Area Health Service (GSAHS) has developed a local plan. This short report describes how activities promoted in the state plan were prioritised and six outcomes identified as the focus for the GSAHS Tobacco Control Plan 2006-2009.
36 CFR 219.13 - Coordination among Federal agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Collaborative Planning for Sustainability § 219.13 Coordination among Federal agencies. The responsible official must provide early and... proposed actions; (b) For the streamlined coordination of Federal agency policies, resource management...
29 CFR 1915.502 - Fire safety plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 7 2012-07-01 2012-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...
29 CFR 1915.502 - Fire safety plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 7 2014-07-01 2014-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...
29 CFR 1915.502 - Fire safety plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 7 2013-07-01 2013-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...
77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: In response to a... that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South...
Verstynen, Timothy; Phillips, Jeff; Braun, Emily; Workman, Brett; Schunn, Christian; Schneider, Walter
2012-01-01
Many everyday skills are learned by binding otherwise independent actions into a unified sequence of responses across days or weeks of practice. Here we looked at how the dynamics of action planning and response binding change across such long timescales. Subjects (N = 23) were trained on a bimanual version of the serial reaction time task (32-item sequence) for two weeks (10 days total). Response times and accuracy both showed improvement with time, but appeared to be learned at different rates. Changes in response speed across training were associated with dynamic changes in response time variability, with faster learners expanding their variability during the early training days and then contracting response variability late in training. Using a novel measure of response chunking, we found that individual responses became temporally correlated across trials and asymptoted to set sizes of approximately 7 bound responses at the end of the first week of training. Finally, we used a state-space model of the response planning process to look at how predictive (i.e., response anticipation) and error-corrective (i.e., post-error slowing) processes correlated with learning rates for speed, accuracy and chunking. This analysis yielded non-monotonic association patterns between the state-space model parameters and learning rates, suggesting that different parts of the response planning process are relevant at different stages of long-term learning. These findings highlight the dynamic modulation of response speed, variability, accuracy and chunking as multiple movements become bound together into a larger set of responses during sequence learning. PMID:23056630
48 CFR 605.207-70 - Acquisitions available from only one responsible source.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Synopsis of Proposed Contract Actions 605.207-70 Acquisitions available from only one responsible source. In addition to the... and the information a potential source must submit. [53 FR 26164, July 11, 1988, as amended at 69 FR...
33 CFR 155.1045 - Response plan requirements for vessels carrying oil as a secondary cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... actions. (4) The organizational structure that will be used to manage the response actions. This structure... management team member within the organizational structure identified in paragraph (d)(4) of this section. (e...-based personnel and the information required for those notifications. Notifications must include those...
Emergency Response Alternatives
Based on the National Contingency Plan, EPA defines the following types: classic emergencies, requiring on-site activities within minutes/hours; time-critical actions, which must occur within 6 months; and non-time-critical actions, which can take longer.
Poeton, Richard W; Glines, Wayne M; McBaugh, Debra
2009-01-01
Since 11 September 2001, improvised nuclear devices have become recognized as an important radiological threat requiring emergency response planning. Although Protective Action Guidance is well established for fixed nuclear facilities, correspondingly well-developed guidance does not exist for nuclear explosions. The Washington State Department of Health has developed preplanned Protective Action Recommendations for improvised nuclear device explosions. These recommendations recognize the need for advice to the public soon after such an event, before significant data are available. They can be used before significant outside support is available locally, and reference observable effects so people can use them if communications were disabled. The recommendations focus on early actions (24-48 h) and place priority on actions to avoid deterministic health effects due to residual fallout. Specific emphasis is placed on determining recommendations for evacuation, as well as the extent of the area for sheltering. The key recommendations developed for an initial public response are: (1) if there is ready access to robust shelter such as an underground basement or interior spaces in a multi-story structure, immediate sheltering in these areas is the best action, regardless of location; (2) if robust shelter is not available, and if fallout is observed in the area, then evacuation is the best general recommendation for locations within 16 km (10 miles) of the explosion; and (3) beyond 16 km (10 miles), the generally recommended protective action is to shelter in the best-protected location which is readily available.
2002-07-01
Monthly. Caspian Tern Working Group Developing a plan to reduce smolt predation by Caspian terns nesting in the Columbia River estuary. As needed...Environment and Public Works, U.S. SenateJuly 2002 COLUMBIA RIVER BASIN SALMON AND STEELHEAD Federal Agencies’ Recovery Responsibilities... COLUMBIA RIVER BASIN SALMON AND STEELHEAD: Federal Agencies Recovery Responsibilities, Expenditures and Actions Contract Number Grant Number Program
A new intrusion prevention model using planning knowledge graph
NASA Astrophysics Data System (ADS)
Cai, Zengyu; Feng, Yuan; Liu, Shuru; Gan, Yong
2013-03-01
Intelligent plan is a very important research in artificial intelligence, which has applied in network security. This paper proposes a new intrusion prevention model base on planning knowledge graph and discuses the system architecture and characteristics of this model. The Intrusion Prevention based on plan knowledge graph is completed by plan recognition based on planning knowledge graph, and the Intrusion response strategies and actions are completed by the hierarchical task network (HTN) planner in this paper. Intrusion prevention system has the advantages of intelligent planning, which has the advantage of the knowledge-sharing, the response focused, learning autonomy and protective ability.
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Content of contingency plan. 264.52... Contingency Plan and Emergency Procedures § 264.52 Content of contingency plan. (a) The contingency plan must describe the actions facility personnel must take to comply with §§ 264.51 and 264.56 in response to fires...
National Action Plan on Superconductivity Research and Development
NASA Astrophysics Data System (ADS)
1989-12-01
The Superconductivity Action Plan pursuant to the Superconductivity and Competitiveness Act of 1988 is presented. The plan draws upon contributions from leaders in the technical community of the Federal Government responsible for research and development in superconductivity programs, as well as from the report of the Committee to Advise the President on Superconductivity. Input from leaders in the private sector was obtained during the formulation and review of the plan. Some contents: Coordination of the plan; Technical areas (high temperature superconductivity materials in general, high temperature superconductivity films for sensors and electronics, magnets, large area high temperature superconductivity films, bulk conductors); and Policy areas.
40 CFR 300.180 - State and local participation in response.
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.180 State and local... state response official for federal and/or state-lead response actions, and coordinating/communicating... response. 300.180 Section 300.180 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
40 CFR 300.180 - State and local participation in response.
Code of Federal Regulations, 2012 CFR
2012-07-01
... POLLUTION CONTINGENCY PLAN Responsibility and Organization for Response § 300.180 State and local... state response official for federal and/or state-lead response actions, and coordinating/communicating... response. 300.180 Section 300.180 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED...
Nash Equilibria in Theory of Reasoned Action
NASA Astrophysics Data System (ADS)
Almeida, Leando; Cruz, José; Ferreira, Helena; Pinto, Alberto Adrego
2009-08-01
Game theory and Decision Theory have been applied to many different areas such as Physics, Economics, Biology, etc. In its application to Psychology, we introduce, in the literature, a Game Theoretical Model of Planned Behavior or Reasoned Action by establishing an analogy between two specific theories. In this study we take in account that individual decision-making is an outcome of a process where group decisions can determine individual probabilistic behavior. Using Game Theory concepts, we describe how intentions can be transformed in behavior and according to the Nash Equilibrium, this process will correspond to the best individual decision/response taking in account the collective response. This analysis can be extended to several examples based in the Game Theoretical Model of Planned Behavior or Reasoned Action.
The structure of affective action representations: temporal binding of affective response codes.
Eder, Andreas B; Müsseler, Jochen; Hommel, Bernhard
2012-01-01
Two experiments examined the hypothesis that preparing an action with a specific affective connotation involves the binding of this action to an affective code reflecting this connotation. This integration into an action plan should lead to a temporary occupation of the affective code, which should impair the concurrent representation of affectively congruent events, such as the planning of another action with the same valence. This hypothesis was tested with a dual-task setup that required a speeded choice between approach- and avoidance-type lever movements after having planned and before having executed an evaluative button press. In line with the code-occupation hypothesis, slower lever movements were observed when the lever movement was affectively compatible with the prepared evaluative button press than when the two actions were affectively incompatible. Lever movements related to approach and avoidance and evaluative button presses thus seem to share a code that represents affective meaning. A model of affective action control that is based on the theory of event coding is discussed.
77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... the Federal Register on September 19, 2012. In that action, in response to a remand by the Ninth... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South... State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially...
76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.
School Emergency Planning Guide. [Revised.
ERIC Educational Resources Information Center
Pennsylvania State Emergency Management Agency, Harrisburg.
Guidelines to help school districts in Pennsylvania recognize potential hazards and develop a plan of community action are presented in this guidebook. The 1988 Emergency Management Services Code requires that every publicly funded state school have a disaster response plan that is exercised annually. Further, all publicly funded educational…
Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies
NASA Technical Reports Server (NTRS)
Van Cise, Edward A.; Kelly, Brian J.; Radigan, Jeffery P.; Cranmer, Curtis W.
2016-01-01
Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018
Looking at the formulation of national biosecurity education action plans
Sture, J.; Minehata, M.; Shinomiya, N.
2015-01-01
In order for states to be assured of their compliance with the requirements of the Biological and Toxin Weapons Convention, it is necessary that all those science and policy stakeholders working within that state should be aware of their responsibilities under the Convention. This can only be achieved through a comprehensive national biosecurity education programme. We propose that each state should produce a national biosecurity action plan, with accompanying resources and materials to achieve this. A number of resources are already available online to support states in this challenge. We present a model for a national biosecurity action plan and propose a number of ways in which this may be achieved. PMID:22606763
Code of Federal Regulations, 2013 CFR
2013-07-01
... Substances and Disease Registry CDC—Centers for Disease Control DOC—Department of Commerce DOD—Department of... Response Advisory Team DRG—District Response Group ERT—Environmental Response Team ESF—Emergency Support... Action RCP—Regional Contingency Plan RD—Remedial Design RERT—Radiological Emergency Response Team RI...
Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-11-20
On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, frommore » which the Team derived four key findings. In the Safety and Health (S H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER).« less
Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-11-20
On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES&H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from whichmore » the Team derived four key findings. In the Safety and Health (S&H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S&H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER).« less
Beyond cost: 'responsible purchasing' of managed care by employers.
Lo Sasso, A T; Perloff, L; Schield, J; Murphy, J J; Mortimer, J D; Budetti, P P
1999-01-01
We explore the extent of "responsible purchasing" by employers--the degree to which employers collect and use nonfinancial information in selecting and managing employee health plans. Most firms believe that they have some responsibility for assessing the quality of the health plans they offer. Some pay attention to plan characteristics such as the ability to provide adequate access to providers and services and scores on enrollee satisfaction surveys. A more limited but still notable number of firms take specific actions based on responsible purchasing information. Because of countervailing pressures, however, it is not clear whether or not the firms most involved in responsible purchasing are signaling a developing trend.
Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.
2015-01-01
In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381
Caruana, Fausto; Uithol, Sebo; Cantalupo, Gaetano; Sartori, Ivana; Lo Russo, Giorgio; Avanzini, Pietro
2014-01-01
Recent findings in monkeys suggest that action selection is based on a competition between various action options that are automatically planned by the motor system. Here we discuss data from intracranial EEG recordings in human premotor cortex (PMC) during a bimanual version of the Eriksen flankers test that suggest that the same principles apply to human action decisions. Recording sites in the dorsal PMC show an early but undifferentiated activation, a delayed response that depends on the experimental conditions and, finally, a movement related activation during action execution. Additionally, we found that the medial part of the PMC show a significant increase in response for ipsilateral trials, suggesting a role in inhibiting the wrong response. The ventral PMC seems to be involved in action execution, rather than action selection. Together these findings suggest that the human PMC is part of a network that specifies, selects, and executes actions. PMID:25206328
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is wellmore » below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.« less
40 CFR 300.820 - Administrative record file for a removal action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.820 Administrative record file for a removal action. (a) If, based on the site evaluation, the lead agency determines... public comment. At such time, the lead agency shall publish in a major local newspaper of general...
40 CFR Appendix D to Part 300 - Appropriate Actions and Methods of Remedying Releases
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Pt. 300, App. D Appendix D to Part 300—Appropriate Actions and Methods... contaminated soil, sediment, or waste, the following types of response actions shall generally be considered: removal, treatment, or containment of the soil, sediment, or waste to reduce or eliminate the potential...
40 CFR 300.160 - Documentation and cost recovery.
Code of Federal Regulations, 2013 CFR
2013-07-01
... CONTINGENCY PLAN Responsibility and Organization for Response § 300.160 Documentation and cost recovery. (a... response action taken, accurate accounting of federal, state, or private party costs incurred for response... federal resources will be available for a timely response to a discharge or release. The ultimate decision...
Sharing international experiences in disasters: summary and action plan.
Andrews, R A; Austin, C; Brown, R; Chen, Y Z; Engindeniz, Z; Girouard, R; Leaman, P; Masellis, M; Nakayama, S; Polentsov, Y O; Suserud, B O
2001-01-01
The discussions in this theme provided an opportunity to share specific experiences with disasters that occurred outside of the Asia-Pacific Rim. Details of the methods used are provided in the preceding paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. Since the findings from the Theme 7 and Theme 3 groups were similar, the chairs of both groups presided over one workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. The main points developed during the presentations and discussion included: (1) disaster response planning, (2) predetermined command and organizational structure, (3) rapid response capability, (4) mitigation, and (5) communications and alternatives. The action plans presented are in common with those presented by Theme 3, and include: (1) plan disaster responses including the different types, identification of hazards, training based on experiences, and provision of public education; (2) improving coordination and control; (3) maintaining communications assuming infrastructure breakdown; (4) maximizing mitigation through standardized evaluations, creation of a legal framework, and recognition of advocacy and public participation; and (5) providing resources and knowledge through access to existing therapies, using the media, and increasing decentralization of hospital inventories. Most of the problems that occurred outside the Asia-Pacific rim relative to disaster management are similar to those experienced within it. They should be addressed in common with the rest of the world.
NASA Technical Reports Server (NTRS)
Irwin, Daniel
2010-01-01
Goal 1: Enhance Applications Research Advance the use of NASA Earth science in policy making, resource management and planning, and disaster response. Key Actions: Identify priority needs, conduct applied research to generate innovative applications, and support projects that demonstrate uses of NASA Earth science. Goal 2: Increase Collaboration Establish a flexible program structure to meet diverse partner needs and applications objectives. Key Actions: Pursue partnerships to leverage resources and risks and extend the program s reach and impact. Goal 3:Accelerate Applications Ensure that NASA s flight missions plan for and support applications goals in conjunction with their science goals, starting with mission planning and extending through the mission life cycle. Key Actions: Enable identification of applications early in satellite mission lifecycle and facilitate effective ways to integrate end-user needs into satellite mission planning
Homeland Security Strategic Research Action Plan 2012 - 2016
EPA’s Homeland Security research plan outline and how it will address science and technological gaps and improve the Agency’s ability to carry out its responsibilities associated with preparing for and responding to, terrorist attacks, and other disasters.
The Argo Merchant oil spill on-scene coordinator's report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1977-12-01
This report factually documents the oil spill response action initiated by the United States Government following the grounding and subsequent foundering of the Liberian-registered tanker ARGO MERCHANT off the Northeast Coast of the United States at 0700 hours on December 15, 1976. This report covers the following factors associated with the pollution incident: Description of the cause and initial situation; Organization of response action and resources committed; Effectiveness of response and removal actions by The discharger, State and local forces, and Federal agencies and special forces; Unique problems encountered; and Recommendations on Means to prevent a reoccurrence, Improvement of responsemore » actions, and Changes needed to improve National or Regional Contingency Plans.« less
Emergency Response Teams in Action.
ERIC Educational Resources Information Center
Watson, James A.
2001-01-01
Illustrates the value of proper crisis response training to help schools protect lives by avoiding adverse situations. Details the execution of a crisis management plan, which was developed following a cafeteria/kitchen explosion. (GR)
10 CFR 72.32 - Emergency Plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... emergencies. Radiological/Health Physics, Medical, and Fire drills shall be conducted annually. Semiannual... onsite exercises to test response to simulated emergencies. Radiological/Health Physics, Medical, and... this action is immediately needed to protect the public health and safety and no action consistent with...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided.
Woods, Elizabeth A; Hernandez, Arturo E; Wagner, Victoria E; Beilock, Sian L
2014-06-01
The present functional magnetic resonance imaging study examined the neural response to familiar and unfamiliar, sport and non-sport environmental sounds in expert and novice athletes. Results revealed differential neural responses dependent on sports expertise. Experts had greater neural activation than novices in focal sensorimotor areas such as the supplementary motor area, and pre- and postcentral gyri. Novices showed greater activation than experts in widespread areas involved in perception (i.e. supramarginal, middle occipital, and calcarine gyri; precuneus; inferior and superior parietal lobules), and motor planning and processing (i.e. inferior frontal, middle frontal, and middle temporal gyri). These between-group neural differences also appeared as an expertise effect within specific conditions. Experts showed greater activation than novices during the sport familiar condition in regions responsible for auditory and motor planning, including the inferior frontal gyrus and the parietal operculum. Novices only showed greater activation than experts in the supramarginal gyrus and pons during the non-sport unfamiliar condition, and in the middle frontal gyrus during the sport unfamiliar condition. These results are consistent with the view that expert athletes are attuned to only the most familiar, highly relevant sounds and tune out unfamiliar, irrelevant sounds. Furthermore, these findings that athletes show activation in areas known to be involved in action planning when passively listening to sounds suggests that auditory perception of action can lead to the re-instantiation of neural areas involved in producing these actions, especially if someone has expertise performing the actions. Copyright © 2014. Published by Elsevier Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A20-0805-4999-400-00-0-0-2, 2100000] Resource... Reservoir State Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION... Parks and Recreation was given the responsibility to plan, design, construct, maintain, and operate the...
ERIC Educational Resources Information Center
Romero, David T., Ed.
The San Bernardino Valley College (California) Strategic Enrollment Management (SEM) Plan was developed to specifically increase student enrollment and to improve retention over 2000-2002, and thereafter. Presents the SEM plan in two parts: recruitment and retention. The date, description, action, person responsible, date needed, date completed,…
Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation.
Laguna, Mariola; Purc, Ewelina
2016-01-01
The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans' formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning.
Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, Milan, TN, March 11, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-09-01
This decision document presents the selected action for the Salvage Yard, Former Ammunition Burnout Area (ABA), and Sanitary Landfill at MLAAP, located in Gibson and Carroll Counties, TN. This ROD addresses the final response action planned for the Salvage Yard, Former ABA, and Sanitary Landfill, including soil and groundwater. NFA is the selected remedy for soil and groundwater at the Salvage Yard, Former ABA, and Sanitary landfill. The selected remedy manages the risk to acceptable levels for both human health and the environment and is the final action planned.
Söderbaum, P; Tropp, H
2004-01-01
Efforts to link and balance national water policies, local water action and national security issues are discussed. There needs to be greater clarity of water roles, rights and responsibilities among national stakeholders as well as between states. In some cases, insufficient attention has been paid to local concerns and, in balancing national and local actions, it is necessary to address decentralization in the context of a transboundary state. There is a strong need for enhanced stakeholder participation in the formulation and implementation of national and local water management plans.
Haregu, Tilahun Nigatu; Setswe, Geoffrey; Elliott, Julian; Oldenburg, Brian
2014-01-01
Introduction: Although there are several models of integrated architecture, we still lack models and theories about the integration process of health system responses to HIV/AIDS and NCDs. Objective: The overall purpose of this study is to design an action model, a systematic approach, for the integration of health system responses to HIV/AIDS and NCDs in developing countries. Methods: An iterative and progressive approach of model development using inductive qualitative evidence synthesis techniques was applied. As evidence about integration is spread across different fields, synthesis of evidence from a broad range of disciplines was conducted. Results: An action model of integration having 5 underlying principles, 4 action fields, and a 9-step action cycle is developed. The INTEGRATE model is an acronym of the 9 steps of the integration process: 1) Interrelate the magnitude and distribution of the problems, 2) Navigate the linkage between the problems, 3) Testify individual level co-occurrence of the problems, 4) Examine the similarities and understand the differences between the response functions, 5) Glance over the health system’s environment for integration, 6) Repackage and share evidence in a useable form, 7) Ascertain the plan for integration, 8) Translate the plan in to action, 9) Evaluate and Monitor the integration. Conclusion: Our model provides a basis for integration of health system responses to HIV/AIDS and NCDs in the context of developing countries. We propose that future empirical work is needed to refine the validity and applicability of the model. PMID:24373260
Code of Federal Regulations, 2011 CFR
2011-07-01
... ACCIDENT PREVENTION PROVISIONS Emergency Response § 68.90 Applicability. (a) Except as provided in... in the community emergency response plan developed under 42 U.S.C. 11003; (2) For stationary sources... operator has coordinated response actions with the local fire department; and (3) Appropriate mechanisms...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ACCIDENT PREVENTION PROVISIONS Emergency Response § 68.90 Applicability. (a) Except as provided in... in the community emergency response plan developed under 42 U.S.C. 11003; (2) For stationary sources... operator has coordinated response actions with the local fire department; and (3) Appropriate mechanisms...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ACCIDENT PREVENTION PROVISIONS Emergency Response § 68.90 Applicability. (a) Except as provided in... in the community emergency response plan developed under 42 U.S.C. 11003; (2) For stationary sources... operator has coordinated response actions with the local fire department; and (3) Appropriate mechanisms...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ACCIDENT PREVENTION PROVISIONS Emergency Response § 68.90 Applicability. (a) Except as provided in... in the community emergency response plan developed under 42 U.S.C. 11003; (2) For stationary sources... operator has coordinated response actions with the local fire department; and (3) Appropriate mechanisms...
The purpose of this document is to provide guidance to the EPA Regions for developing Institutional Control Implementation and Assurance Plans (ICIAPs) at contaminated sites where the response action includes an institutional controls (ICs) component.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... Hipps Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Proposed rule... Hipps Road Landfill Superfund Site (Site) located in Jacksonville, Florida, from the National Priorities..., have determined that all appropriate response actions under CERCLA, other than operation, maintenance...
How are coastal households responding to climate change?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elrick-Barr, Carmen E.; Smith, Timothy F.; Preston, Benjamin L.
In Australia, shared responsibility is a concept advocated to promote collective climate change adaptation by multiple actors and institutions. However, a shared response is often promoted in the absence of information regarding actions currently taken; in particular, there is limited knowledge regarding action occurring at the household scale. To address this gap, we examine household actions taken to address climate change and associated hazards in two Australian coastal communities. Mixed methods research is conducted to answer three questions: (1) what actions are currently taken (mitigation, actions to lobby for change or adaptation to climate impacts)? (2) why are these actionsmore » taken (e.g. are they consistent with capacity, experience, perceptions of risk); and (3) what are the implications for adaptation? We find that households are predominantly mitigating greenhouse gas emissions and that impact orientated adaptive actions are limited. Coping strategies are considered sufficient to mange climate risks, proving a disincentive for additional adaptive action. Influencing factors differ, but generally, risk perception and climate change belief are associated with action. Furthermore, the likelihood of more action is a function of homeownership and a tendency to plan ahead. Addressing factors that support or constrain household adaptive decision-making and action, from the physical (e.g. homeownership) to the social (e.g. skills in planning and a culture of adapting to change) will be critical in increasing household participation in adaptation.« less
How are coastal households responding to climate change?
Elrick-Barr, Carmen E.; Smith, Timothy F.; Preston, Benjamin L.; ...
2016-06-13
In Australia, shared responsibility is a concept advocated to promote collective climate change adaptation by multiple actors and institutions. However, a shared response is often promoted in the absence of information regarding actions currently taken; in particular, there is limited knowledge regarding action occurring at the household scale. To address this gap, we examine household actions taken to address climate change and associated hazards in two Australian coastal communities. Mixed methods research is conducted to answer three questions: (1) what actions are currently taken (mitigation, actions to lobby for change or adaptation to climate impacts)? (2) why are these actionsmore » taken (e.g. are they consistent with capacity, experience, perceptions of risk); and (3) what are the implications for adaptation? We find that households are predominantly mitigating greenhouse gas emissions and that impact orientated adaptive actions are limited. Coping strategies are considered sufficient to mange climate risks, proving a disincentive for additional adaptive action. Influencing factors differ, but generally, risk perception and climate change belief are associated with action. Furthermore, the likelihood of more action is a function of homeownership and a tendency to plan ahead. Addressing factors that support or constrain household adaptive decision-making and action, from the physical (e.g. homeownership) to the social (e.g. skills in planning and a culture of adapting to change) will be critical in increasing household participation in adaptation.« less
Country actions to meet UN commitments on non-communicable diseases: a stepwise approach.
Bonita, Ruth; Magnusson, Roger; Bovet, Pascal; Zhao, Dong; Malta, Deborah C; Geneau, Robert; Suh, Il; Thankappan, Kavumpurathu Raman; McKee, Martin; Hospedales, James; de Courten, Maximilian; Capewell, Simon; Beaglehole, Robert
2013-02-16
Strong leadership from heads of state is needed to meet national commitments to the UN political declaration on non-communicable diseases (NCDs) and to achieve the goal of a 25% reduction in premature NCD mortality by 2025 (the 25 by 25 goal). A simple, phased, national response to the political declaration is suggested, with three key steps: planning, implementation, and accountability. Planning entails mobilisation of a multisectoral response to develop and support the national action plan, and to build human, financial, and regulatory capacity for change. Implementation of a few priority and feasible cost-effective interventions for the prevention and treatment of NCDs will achieve the 25 by 25 goal and will need only few additional financial resources. Accountability incorporates three dimensions: monitoring of progress, reviewing of progress, and appropriate responses to accelerate progress. A national NCD commission or equivalent, which is independent of government, is needed to ensure that all relevant stakeholders are held accountable for the UN commitments to NCDs. Copyright © 2013 Elsevier Ltd. All rights reserved.
Symstad, Amy J.; Fisichelli, Nicholas A.; Miller, Brian W.; Rowland, Erika; Schuurman, Gregor W.
2017-01-01
Scenario planning helps managers incorporate climate change into their natural resource decision making through a structured “what-if” process of identifying key uncertainties and potential impacts and responses. Although qualitative scenarios, in which ecosystem responses to climate change are derived via expert opinion, often suffice for managers to begin addressing climate change in their planning, this approach may face limits in resolving the responses of complex systems to altered climate conditions. In addition, this approach may fall short of the scientific credibility managers often require to take actions that differ from current practice. Quantitative simulation modeling of ecosystem response to climate conditions and management actions can provide this credibility, but its utility is limited unless the modeling addresses the most impactful and management-relevant uncertainties and incorporates realistic management actions. We use a case study to compare and contrast management implications derived from qualitative scenario narratives and from scenarios supported by quantitative simulations. We then describe an analytical framework that refines the case study’s integrated approach in order to improve applicability of results to management decisions. The case study illustrates the value of an integrated approach for identifying counterintuitive system dynamics, refining understanding of complex relationships, clarifying the magnitude and timing of changes, identifying and checking the validity of assumptions about resource responses to climate, and refining management directions. Our proposed analytical framework retains qualitative scenario planning as a core element because its participatory approach builds understanding for both managers and scientists, lays the groundwork to focus quantitative simulations on key system dynamics, and clarifies the challenges that subsequent decision making must address.
ERIC Educational Resources Information Center
Pensacola Junior Coll., FL. Office of Institutional Research and Effectiveness.
Prepared in response to a Florida legislative mandate requiring the development and implementation of institutional accountability goals, this report presents the goals adopted by Pensacola Junior College (PJC), the college's plan of action, and data on progress made as of 1992-93 on the goals. Following an introduction, the first part presents…
Health-sector responses to address the impacts of climate change in Nepal.
Dhimal, Meghnath; Dhimal, Mandira Lamichhane; Pote-Shrestha, Raja Ram; Groneberg, David A; Kuch, Ulrich
2017-09-01
Nepal is highly vulnerable to global climate change, despite its negligible emission of global greenhouse gases. The vulnerable climate-sensitive sectors identified in Nepal's National Adaptation Programme of Action (NAPA) to Climate Change 2010 include agriculture, forestry, water, energy, public health, urbanization and infrastructure, and climate-induced disasters. In addition, analyses carried out as part of the NAPA process have indicated that the impacts of climate change in Nepal are not gender neutral. Vector-borne diseases, diarrhoeal diseases including cholera, malnutrition, cardiorespiratory diseases, psychological stress, and health effects and injuries related to extreme weather are major climate-sensitive health risks in the country. In recent years, research has been done in Nepal in order to understand the changing epidemiology of diseases and generate evidence for decision-making. Based on this evidence, the experience of programme managers, and regular surveillance data, the Government of Nepal has mainstreamed issues related to climate change in development plans, policies and programmes. In particular, the Government of Nepal has addressed climate-sensitive health risks. In addition to the NAPA report, several policy documents have been launched, including the Climate Change Policy 2011; the Nepal Health Sector Programme - Implementation Plan II (NHSP-IP 2) 2010-2015; the National Health Policy 2014; the National Health Sector Strategy 2015-2020 and its implementation plan (2016-2021); and the Health National Adaptation Plan (H-NAP): climate change and health strategy and action plan (2016-2020). However, the translation of these policies and plans of action into tangible action on the ground is still in its infancy in Nepal. Despite this, the health sector's response to addressing the impact of climate change in Nepal may be taken as a good example for other low- and middle-income countries.
The dynamic range of response set activation during action sequencing.
Behmer, Lawrence P; Crump, Matthew J C
2017-03-01
We show that theories of response scheduling for sequential action can be discriminated on the basis of their predictions for the dynamic range of response set activation during sequencing, which refers to the momentary span of activation states for completed and to-be-completed actions in a response set. In particular, theories allow that future actions in a plan are partially activated, but differ with respect to the width of the range, which refers to the number of future actions that are partially activated. Similarly, theories differ on the width of the range for recently completed actions that are assumed to be rapidly deactivated or gradually deactivated in a passive fashion. We validate a new typing task for measuring momentary activation states of actions across a response set during action sequencing. Typists recruited from Amazon Mechanical Turk copied a paragraph by responding to a "go" signal that usually cued the next letter but sometimes cued a near-past or future letter (n-3, -2, -1, 0, +2, +3). The activation states for producing letters across go-signal positions can be inferred from RTs and errors. In general, we found evidence of graded parallel activation for future actions and rapid deactivation of more distal past actions. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenly, G.D. Jr.
1986-03-01
The risk assessment lesson learned from the Bhopal tragedy is both simple and complex. Practical planning for toxic material releases must start with an understanding of what the risks and possible consequences are. Additionally, plans must be formulated to ensure immediate decisive actions tailored to site specific scenarios, and the possible impacts projected on both the plant and surrounding communities. Most importantly, the planning process must include the communities that could be affected. Such planning will ultimately provide significant financial savings and provide for good public relations, and this makes good business sense in both developed and developing countries. Paraphrasingmore » the adage ''a penny saved is a penny earned,'' a penny spent on emergency preparedness is dollars earned through public awareness. The complex aspect of these simple concepts is overcoming human inertia, i.e., overcoming the ''it can't happen here'' syndrome in both government and private industry. A world center of excellence (ITRAC), acting as a center for education, research, and development in the area of emergency planning and response, will be the conduit for needed technology transfer to national centers of excellence in emergency planning and response. These national emergency planning and response centers (NARACS), managed by private industry for governments, will be catalysts to action in formulating effective plans involving potentially affected communities and plant management. The ITRAC/NARAC proposal is a simple concept involving complex ideas to solve the simple problem of being prepared for the Bhopal-like emergency which, as experience has demonstrated, will have complex consequences for the unprepared.« less
Joint Center for Lessons Learned Quarterly Bulletin. Volume 5, Issue 1, September/December 2002
2002-09-01
Federal Response Plan, Basic Plan, April 1999, pgs 1-2. 4 USJFCOM After-action report, XIX Winter Olympic and VII Paralympic Games , Salt Lake City Utah...the Judiciary, United States Senate, May 31, 2001. 7 USJFCOM After-action report, XIX Winter Olympic and VII Paralympic Games , Salt Lake City Utah...Learned from the XIX Winter Olympic and VII Paralympic Games , Salt Lake City Charlene (Charley) Eastman Military Analyst “Time and distance from the events
Maritime Piracy: Examining the U.S. Response to a Global Threat
2010-03-01
Security Council in December 2008, as the Countering Piracy off the Horn of Africa Partnership & Action Plan ( CPAP ). In accordance with U.S. policy to...international efforts,‖43 the plan places significant importance on multilateral action to solve the problem of Somali piracy. CPAP seeks to involve a siege...an interest in maritime security.‖44 CPAP directs the U.S., in concert with a ―global partnership,‖ to address three lines of operation: 1
Strategic Plan for Electronic Commerce, Defense Personnel Support Center
1993-07-01
faster, less expensive and far more accurate electronic commerce business methods that use Electronic Data Interchange standards. As a context for that...management responsibilities, establishes a plan of action and milestones, and describes ongoing electronic commerce projects at the corporate and business unit level.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Proposed rule; notice of... Delete the Hipps Road Landfill Superfund Site (Site) located in Jacksonville, Florida, from the National..., have determined that all appropriate response actions under CERCLA, other than operation, maintenance...
Saint, Victoria; Floranita, Rustini; Koemara Sakti, Gita Maya; Pambudi, Imran; Hermawan, Lukas; Villar, Eugenio; Magar, Veronica
2018-01-01
ABSTRACT The World Health Organization’s Innov8 Approach for Reviewing National Health Programmes to Leave No One Behind is an eight-step process that supports the operationalization of the Sustainable Development Goals’ commitment to ‘leave no one behind’. In 2014–2015, Innov8 was adapted and applied in Indonesia to review how the national neonatal and maternal health action plans could become more equity-oriented, rights-based and gender-responsive, and better address critical social determinants of health. The process was led by the Indonesian Ministry of Health, with the support of WHO. It involved a wide range of actors and aligned with/fed into the drafting of the maternal newborn health action plan and the implementation planning of the newborn action plan. Key activities included a sensitization meeting, diagnostic checklist, review workshop and in-country work by the review teams. This ‘methods forum’ article describes this adaptation and application process, the outcomes and lessons learnt. In conjunction with other sources, Innov8 findings and recommendations informed national and sub-national maternal and neonatal action plans and programming to strengthen a ‘leave no one behind’ approach. As follow-up during 2015–2017, components of the Innov8 methodology were integrated into district-level planning processes for maternal and newborn health, and Innov8 helped generate demand for health inequality monitoring and its use in planning. In Indonesia, Innov8 enhanced national capacity for equity-oriented, rights-based and gender-responsive approaches and addressing critical social determinants of health. Adaptation for the national planning context (e.g. decentralized structure) and linking with health inequality monitoring capacity building were important lessons learnt. The pilot of Innov8 in Indonesia suggests that this approach can help operationalize the SDGs’ commitment to leave no one behind, in particular in relation to influencing programming and monitoring and evaluation. PMID:29569529
Koller, Theadora Swift; Saint, Victoria; Floranita, Rustini; Koemara Sakti, Gita Maya; Pambudi, Imran; Hermawan, Lukas; Briot, Benedicte; Frenz, Patricia; Solar, Orielle; Campos, Pilar; Villar, Eugenio; Magar, Veronica
The World Health Organization's Innov8 Approach for Reviewing National Health Programmes to Leave No One Behind is an eight-step process that supports the operationalization of the Sustainable Development Goals' commitment to 'leave no one behind'. In 2014-2015, Innov8 was adapted and applied in Indonesia to review how the national neonatal and maternal health action plans could become more equity-oriented, rights-based and gender-responsive, and better address critical social determinants of health. The process was led by the Indonesian Ministry of Health, with the support of WHO. It involved a wide range of actors and aligned with/fed into the drafting of the maternal newborn health action plan and the implementation planning of the newborn action plan. Key activities included a sensitization meeting, diagnostic checklist, review workshop and in-country work by the review teams. This 'methods forum' article describes this adaptation and application process, the outcomes and lessons learnt. In conjunction with other sources, Innov8 findings and recommendations informed national and sub-national maternal and neonatal action plans and programming to strengthen a 'leave no one behind' approach. As follow-up during 2015-2017, components of the Innov8 methodology were integrated into district-level planning processes for maternal and newborn health, and Innov8 helped generate demand for health inequality monitoring and its use in planning. In Indonesia, Innov8 enhanced national capacity for equity-oriented, rights-based and gender-responsive approaches and addressing critical social determinants of health. Adaptation for the national planning context (e.g. decentralized structure) and linking with health inequality monitoring capacity building were important lessons learnt. The pilot of Innov8 in Indonesia suggests that this approach can help operationalize the SDGs' commitment to leave no one behind, in particular in relation to influencing programming and monitoring and evaluation.
Personality Traits and Training Initiation Process: Intention, Planning, and Action Initiation
Laguna, Mariola; Purc, Ewelina
2016-01-01
The article aims at investigating the role of personality traits in relation to training initiation. Training initiation is conceptualized as a goal realization process, and explained using goal theories. There are three stages of the process analyzed: intention to undertake training, plan formulation, and actual training undertaking. Two studies tested the relationships between five personality traits, defined according to the five factor model, and the stages of the goal realization process. In Study 1, which explains training intention and training plans’ formulation, 155 employees participated. In Study 2, which was time-lagged with two measurement points, and which explains intention, plans, and training actions undertaken, the data from 176 employees was collected at 3 month intervals. The results of these studies show that personality traits, mainly openness to experience, predict the training initiation process to some degree: intention, plans, and actual action initiation. The findings allow us to provide recommendations for practitioners responsible for human resource development. The assessment of openness to experience in employees helps predict their motivation to participate in training activities. To increase training motivation it is vital to strengthen intentions to undertake training, and to encourage training action planning. PMID:27909414
49 CFR 234.103 - Timely response to report of malfunction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Timely response to report of malfunction. 234.103 Section 234.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response...
49 CFR 234.103 - Timely response to report of malfunction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Timely response to report of malfunction. 234.103 Section 234.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response...
Hagley, Gregory W; Mills, Peter D; Shiner, Brian; Hemphill, Robin R
2018-04-01
Root cause analyses (RCA) are often completed in health care settings to determine causes of adverse events (AEs). RCAs result in action plans designed to mitigate future patient harm. National reviews of RCA reports have assessed the safety of numerous health care settings and suggested opportunities for improvement. However, few studies have assessed the safety of receiving care from physical therapists, occupational therapists, or speech and language pathology pathologists. The objective of this study was to determine the types of AEs, root causes, and action plans for risk mitigation that exist within the disciplines of rehabilitation medicine. This study is a retrospective, cross-sectional review. A national search of the Veterans Health Administration RCA database was conducted to identify reports describing AEs associated with physical therapy, occupational therapy, or speech and language pathology services between 2009 and May 2016. Twenty-five reports met the inclusion requirements. The reports were classified by the event type, root cause, action plans, and strength of action plans. Delays in care (32.0%) and falls (28.0%) were the most common type of AE. Three AEs resulted in death. RCA teams identified deficits regarding policy and procedures as the most common root cause. Eighty-eight percent of RCA reports included strong or intermediate action plans to mitigate risk. Strong action plans included standardizing emergency terminology and implementing a dedicated line to call for an emergency response. These data are self-reported and only AEs that are scored as a safety assessment code 3 in the system receive a full RCA, so there are likely AEs that were not captured in this study. In addition, the RCA reports are deidentified and so do not include all patient characteristics. As the Veterans Health Administration system services mostly men, the data might not generalize to non-Veterans Health Administration systems with a different patient mix. Care provided by rehabilitation professionals is generally safe, but AEs do occur. Based on this RCA review, the safety of rehabilitation services can be improved by implementing strong practices to mitigate risk to patients. Checklists should be considered to aid timely decision making when initiating an emergency response.
EPA Response to Review of Office of Research and Development's Research Programs
EPA's response to the review report of the Office of Research and Development’s (ORD) Strategic Research Action Plans (StRAPs) and the cross-cutting program Roadmaps for Environmental Justice and Global Climate Change.
Action Regulation Theory and Career Self-Management
ERIC Educational Resources Information Center
Raabe, Babette; Frese, Michael; Beehr, Terry A.
2007-01-01
Much of the responsibility for managing careers is shifting from employers to adaptive and proactive employees. A career management intervention based on action regulation theory trained 205 white collar employees to engage actively in their own career building by increasing their self-knowledge, career goal commitment, and career plan quality. As…
40 CFR 300.815 - Administrative record file for a remedial action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.815... investigation phase. At such time, the lead agency shall publish in a major local newspaper of general circulation a notice of the availability of the administrative record file. (b) The lead agency shall provide...
78 FR 1586 - Unified Agenda of Federal Regulatory and Deregulatory Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
.... Additionally, this project would update shipboard marine pollution emergency plans for noxious liquid substance... regulations on vessels carrying oil, oil pollution prevention, oil transfer operations, and rules for marine... No. 318 Marine Transportation- 1625-AA12 Related Facility Response Plans for Hazardous Substances...
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Licensee's Organizational Structure for Contingency Responses—A delineation of the organization's chain of.... The following topics must be addressed: a. Organizational Structure. The safeguards contingency plan... individual, group, or organizational entity responsible for each decision and action. The goals of licensee...
Study on Mine Emergency Mechanism based on TARP and ICS
NASA Astrophysics Data System (ADS)
Xi, Jian; Wu, Zongzhi
2018-01-01
By analyzing the experiences and practices of mine emergency in China and abroad, especially the United States and Australia, normative principle, risk management principle and adaptability principle of constructing mine emergency mechanism based on Trigger Action Response Plans (TARP) and Incident Command System (ICS) are summarized. Classification method, framework, flow and subject of TARP and ICS which are suitable for the actual situation of domestic mine emergency are proposed. The system dynamics model of TARP and ICS is established. The parameters such as evacuation ratio, response rate, per capita emergency capability and entry rate of rescuers are set up. By simulating the operation process of TARP and ICS, the impact of these parameters on the emergency process are analyzed, which could provide a reference and basis for building emergency capacity, formulating emergency plans and setting up action plans in the emergency process.
ERIC Educational Resources Information Center
Forbes, Pamela C.
2011-01-01
Problem. The Southern Union started the Adventist EDGE initiative as an action plan in response to the North American Division's document, "Journey to Excellence." The Adventist EDGE became a comprehensive educational reform initiative. However, there were different ideas on how the innovation should look when in action in the schools, and these…
ERIC Educational Resources Information Center
Minnesota State Board for Vocational Education, St. Paul.
In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…
ERIC Educational Resources Information Center
US Department of Education, 2007
2007-01-01
"Lessons Learned" is a series of publications that are a brief recounting of actual school emergencies and crises. This issue of "Lessons Learned" addresses after-action reports, which are an integral part of the emergency preparedness planning continuum and support effective crisis response. After-action reports have a threefold purpose. They…
U.S.-Iraq Agreements: Congressional Oversight Activities and Legislative Response
2009-05-15
in creating the planned agreements, from negotiation to implementation, and took action to ensure such involvement. Members proposed numerous...matter experts. This has equipped Congress with information pertinent to deciding what further action can be taken to involve Congress more in the...concerning the negotiation, execution, and early implementation of the agreements; the second describes in detail the actions taken by Congress thus
Barriers to the implementation of self management support in long term lung conditions
Roberts, NJ; Younis, I; Kidd, L
2012-01-01
Background Self-management improves outcomes in asthma and COPD and is strongly recommended in national and international guidelines; however implementation of the guidelines such as use of written action plans in practice is often poor. Setting A questionnaire survey was undertaken to identify the healthcare professional barriers to implementation of self-management for asthma and COPD in West London. Question Why is self-management education not being undertaken in respiratory conditions? Methods A questionnaire was designed to elicit healthcare professionals' views about barriers to implementation of self-management in asthma and COPD. Results Response rates were 33% (58/175). Results showed strong support for guideline recommendations, however implementation was patchy. Seventy six percent of respondents discussed asthma self-management with patients; however only 47.8% of patients received a written action plan. For COPD patients, 55.1% discussed self-management, with 41% receiving a written action plan. In COPD, there was greater GP involvement and less delegation of self-management. Barriers to implementation included patient factors (compliance, literacy and patient understanding), time constraints and insufficient resources. Those who believed they had witnessed improved health outcomes with self-management (53%, 31/58) were more likely to give written action plans (78%, 24/31, ‘nearly always/sometimes’ gave written action plans), Nearly a third of healthcare professionals reported lacking confidence in constructing written action plans (33% 19/58; GPs 43%, nurses 43%). Conclusion Despite overwhelming evidence self-management support is still not being implemented into routine clinical practice, identified barriers included time constraints, lack of training, lack of belief in patients ability to self-manage and lack of confidence completing self-management plans. Practice implications These issues need to be addressed if self-management support is to be delivered in a meaningful and effective way. PMID:25949665
Interaction in planning vocalizations and grasping.
Tiainen, Mikko; Tiippana, Kaisa; Vainio, Martti; Komeilipoor, Naeem; Vainio, Lari
2017-08-01
Previous studies have shown a congruency effect between manual grasping and syllable articulation. For instance, a power grip is associated with syllables whose articulation involves the tongue body and/or large mouth aperture ([kɑ]) whereas a precision grip is associated with articulations that involve the tongue tip and/or small mouth aperture ([ti]). Previously, this effect has been observed in manual reaction times. The primary aim of the current study was to investigate whether this congruency effect also takes place in vocal responses and to investigate involvement of action selection processes in the effect. The congruency effect was found in vocal and manual responses regardless of whether or not the syllable or grip was known a priori, suggesting that the effect operates with minimal or absent action selection processes. In addition, the effect was observed in vocal responses even when the grip was only prepared but not performed, suggesting that merely planning a grip response primes the corresponding articulatory response. These results support the view that articulation and grasping are processed in a partially overlapping network.
49 CFR 234.109 - Recordkeeping.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports... retain for at least one year (from the latest date of railroad activity in response to a credible report...
49 CFR 234.109 - Recordkeeping.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports... retain for at least one year (from the latest date of railroad activity in response to a credible report...
NASA Astrophysics Data System (ADS)
Reed, D.
2017-12-01
The Louisiana coast has suffered severe land loss in recent decades as human activities have exacerbated the effects of natural stressors leading to catastrophic land loss and increased flood threats to coastal communities. Planning for the future requires a recognition of climate change but also leads to the challenge of understanding how different plausible future conditions influence the outcomes of restoration and protection actions. In coastal Louisiana, the $50 billion Coastal master Plan is legislatively required to be revisited every 5 years in order to ensure that plans for the future continue to be based on the best available, but constantly evolving, scientific information. For the 2017 iteration of the Coastal Master Plan, identification of the environmental scenarios to be explored began in 2014 and included both professional judgment regarding the most important drivers of future change, as well as climate change information derived during the National Climate Assessment. The number of scenarios to be explored was limited by both available resources and the need to make the findings accessible to stakeholders and policy makers. Plausible ranges were identified for key drivers of coastal landscape change, including climatic factors such as eustatic sea-level, precipitation and evapotranspiration. Sensitivity analysis was conducted to explore how the coastal landscape changed in response to combinations of values, allowed agency personnel to select three scenarios against which to test the effectiveness of different restoration and protection actions. The 2017 Coastal Master Plan was then developed by exploring the response of different actions to the scenarios, and how project costs also varied depending on future conditions. Such consideration of climate change in coastal planning at the state scale is facilitated by the availability of scientifically valid information on climate change, that has already been reviewed and sourced.
Retirement Plan Lawsuits: Preparing for the Storm
ERIC Educational Resources Information Center
Morahan, John; Turner, Aaron
2017-01-01
Currently, higher education is being roiled by class-action lawsuits filed against high-profile institutions, including MIT, Yale and New York University, over management of their retirement plans. As the lawyers are deployed and the billable hours accrue, it is timely to examine how those who have responsibility for retirement plan…
76 FR 6780 - Agency Information Collection Activities OMB Responses
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
... Action Plan/Activity Integration Plan (CAP/AIP) Reporting System; was approved on 01/06/2011; OMB Number... without change. EPA ICR Number 1445.09; Continuous Release Reporting Regulations (CRRR) under CERCLA; 40... change. EPA ICR Number 1445.10; Continuous Release Reporting Regulations (CRRR) under CERCLA; 40 CFR 302...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... for OMB Review; Comment Request; Occupational Safety and Health State Plans ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Occupational Safety and Health Administration (OSHA... submission of responses. Agency: DOL-OSHA. Title of Collection: Occupational Safety and Health State Plans...
Developing an Academic Information Resources Master Plan: A Paradigm.
ERIC Educational Resources Information Center
Gentry, H. R.
Since 1980, Johnson County Community College (JCCC) has rapidly expanded its use of personal computers in instruction and administration. Many computers were being acquired, however, before appropriate policies, plans, and procedures were developed for their effective management. In response to this problem, the following actions were identified…
Yin, Hsiang Shonna; Gupta, Ruchi S; Mendelsohn, Alan L; Dreyer, Benard; van Schaick, Linda; Brown, Christina R; Encalada, Karen; Sanchez, Dayana C; Warren, Christopher M; Tomopoulos, Suzy
2017-11-01
The objective of the study was to determine whether parents who use a low-literacy, pictogram- and photograph-based written asthma action plan (WAAP) have a better understanding of child asthma management compared to parents using a standard plan. A randomized controlled study was carried out in 2 urban pediatric outpatient clinics. Inclusion criteria were English- and Spanish-speaking parents of 2- to 12-year-old asthmatic children. Parents were randomized to receive a low-literacy or standard asthma action plan (American Academy of Allergy, Asthma and Immunology) for a hypothetical patient on controller and rescue medications. A structured questionnaire was used to assess whether there was an error in knowledge of (1) medications to give everyday and when sick, (2) need for spacer use, and (3) appropriate emergency response to give albuterol and seek medical help. Multiple logistic regression analyses were performed, adjusting for parent age, health literacy (Newest Vital Sign); child asthma severity, medications; and site. 217 parents were randomized (109 intervention and 108 control). Parents who received the low-literacy plan were (1) less likely to make an error in knowledge of medications to take everyday and when sick compared to parents who received the standard plan (63.0 vs. 77.3%, p = 0.03; adjusted odds ratio [AOR] = 0.5[95% confidence interval: 0.2-0.9]) and (2) less likely to make an error regarding spacer use (14.0 vs. 51.1%, p < 0.001; AOR = 0.1 [0.06-0.3]). No difference in error in appropriate emergency response was seen (43.1 vs. 48.1%, p = 0.5). Use of a low-literacy WAAP was associated with better parent understanding of asthma management. Further study is needed to assess whether the use of this action plan improves child asthma outcomes.
Brown, David Richard; Hernández, Agueda; Saint-Jean, Gilbert; Evans, Siân; Tafari, Ida; Brewster, Luther G.; Celestin, Michel J.; Gómez-Estefan, Carlos; Regalado, Fernando; Akal, Siri; Nierenberg, Barry; Kauschinger, Elaine D.; Schwartz, Robert; Page, J. Bryan
2008-01-01
Healthy People 2010 made it a priority to eliminate health disparities. We used a rapid assessment response and evaluation (RARE) to launch a program of participatory action research focused on health disparities in an urban, disadvantaged Black community serviced by a major south Florida health center. We formed partnerships with community members, identified local health disparities, and guided interventions targeting health disparities. We describe the RARE structure used to triangulate data sources and guide intervention plans as well as findings and conclusions drawn from scientific literature and epidemiological, historic, planning, clinical, and ethnographic data. Disenfranchisement and socioeconomic deprivation emerged as the principal determinants of local health disparities and the most appropriate targets for intervention. PMID:18048802
The national response for preventing healthcare-associated infections: data and monitoring.
Kahn, Katherine L; Weinberg, Daniel A; Leuschner, Kristin J; Gall, Elizabeth M; Siegel, Sari; Mendel, Peter
2014-02-01
Historically, the ability to accurately track healthcare-associated infections (HAIs) was hindered due to a lack of coordination among data sources and shortcomings in individual data sources. This paper presents the results of the evaluation of the HAI data and the monitoring component of the Action Plan, focusing on context (goals), inputs, and processes. We used the Content-Input-Process-Product framework, together with the HAI prevention system framework, to describe the transformative processes associated with data and monitoring efforts. Six HAI priority conditions in the 2009 Action Plan created a focus for the selection of goals and activities. Key Action Plan decisions included a phased-in data and monitoring approach, commitment to linking the selection of priority HAIs to highly visible national 5-year prevention targets, and the development of a comprehensive HAI database inventory. Remaining challenges relate to data validation, resources, and the opportunity to integrate electronic health and laboratory records with other provider data systems. The Action Plan's data and monitoring program has developed a sound infrastructure that builds upon technological advances and embodies a firm commitment to prioritization, coordination and alignment, accountability and incentives, stakeholder engagement, and an awareness of the need for predictable resources. With time, and adequate resources, it is likely that the investment in data-related infrastructure during the Action Plan's initial years will reap great rewards.
Seegelke, Christian; Hughes, Charmayne M L
2015-12-01
It has been proposed that the preparation of goal-direct actions involves internal movement simulation, or motor imagery. Evidence suggests that motor imagery is critically involved in the prediction of action consequences and contributes heavily to movement planning processes. The present study examined whether the sensitivity towards end-state comfort and the possibility/impossibility to perform an action sequence are considered during motor imagery. Participants performed a mental rotation task in which two images were simultaneously presented. The image on the left depicted the start posture of a right hand when grasping a bar, while the right image depicted the hand posture at the end of the action sequence. The right image displayed the bar in a vertical orientation with the hand in a comfortable (thumb-up) or in an uncomfortable (thumb-down) posture, while the bar in the left image was rotated in picture plane in steps of 45°. Crucially, the two images formed either a physically possible or physically impossible to perform action sequence. Results revealed strikingly different response time patterns for the two action sequence conditions. In general, response times increased almost monotonically with increasing angular disparity for the possible to perform action sequences. However, slight deviations from this monotonicity were apparent when the sequences contained an uncomfortable as opposed to a comfortable final posture. In contrast, for the impossible sequences, response times did not follow a typical mental rotation function, but instead were uniformly very slow. These findings suggest that both biomechanical constraints (i.e., end-state comfort) and the awareness of the possibility/impossibility to perform an action sequence are considered during motor imagery. We conclude that motor representations contain information about the spatiotemporal movement organization and the possibility of performing an action, which are crucially involved in anticipation and planning of action sequences. Copyright © 2015 Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
..., DHS. ACTION: Notice. SUMMARY: The United States and Canada are staunch allies, vital economic partners... in which the United States and Canada share responsibility for the security and resilience of our..., while working together to facilitate the flows of legitimate travel and trade. Beyond the Border...
40 CFR 307.22 - Preauthorization of response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., EMERGENCY PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION...), if there is acute threat of fire, explosion, or direct human contact with hazardous substances... innovative technology, if appropriate; (7) Employs treatment that reduces the volume, toxicity or mobility of...
Fernández, Marcela T; Gómez, Adrián R; Santojanni, Américo M; Cancio, Alfredo H; Luna, Daniel R; Benítez, Sonia E
2015-01-01
Electronic Health Record system downtimes may have a great impact on patient care continuity. This paper describes the analysis and actions taken to redesign the Contingency Plan Procedure for the Electronic Health Record System of Hospital Italiano de Buenos Aires. After conducting a thorough analysis of the data gathered at post-contingency meetings, weaknesses were identified in the procedure; thus, strategic actions were recommended to redesign the Contingency Plan to secure an effective communications channel, as well as a formal structure for functions that may support the decision-making process. The main actions were: 1) to incorporate the IT Contingencies Committee (Plan management); 2) to incorporate the Coordinator (general supervision of the procedure); and 3) to redefine the role of the Clinical Informatics Resident, who will be responsible for managing communication between the technical team and Electronic Health Record users. As users need the information for continuity of care, key users evaluated the impact of the new strategy with an adapted survey.
Incremental planning to control a blackboard-based problem solver
NASA Technical Reports Server (NTRS)
Durfee, E. H.; Lesser, V. R.
1987-01-01
To control problem solving activity, a planner must resolve uncertainty about which specific long-term goals (solutions) to pursue and about which sequences of actions will best achieve those goals. A planner is described that abstracts the problem solving state to recognize possible competing and compatible solutions and to roughly predict the importance and expense of developing these solutions. With this information, the planner plans sequences of problem solving activities that most efficiently resolve its uncertainty about which of the possible solutions to work toward. The planner only details actions for the near future because the results of these actions will influence how (and whether) a plan should be pursued. As problem solving proceeds, the planner adds new details to the plan incrementally, and monitors and repairs the plan to insure it achieves its goals whenever possible. Through experiments, researchers illustrate how these new mechanisms significantly improve problem solving decisions and reduce overall computation. They briefly discuss current research directions, including how these mechanisms can improve a problem solver's real-time response and can enhance cooperation in a distributed problem solving network.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Action Plan. 984.201 Section 984... § 984.201 Action Plan. (a) Requirement for Action Plan. A PHA must have a HUD-approved Action Plan that... program is a mandatory or voluntary program. (b) Development of Action Plan. The Action Plan shall be...
On the irrationality of emotion and the rationality of awareness.
Lambie, John A
2008-09-01
It is argued that one answer to the question of the rationality of emotion hinges on the different roles in action selection played by emotions when one is aware of them versus when one is not aware of them (awareness being indexed by the ability to report one's emotion). When unaware of one's emotions, they are: (a) not able to enter into one's deliberations about what to do, and (b) more likely to be automatically acted out. This is a problem for rationality because (partly due to the logic of signal detection theory) emotional action urges are often "false positives". In contrast, awareness of emotions crucially allows emotional responses to be inhibited: such inhibition is necessary for truly rational action selection. Furthermore, awareness enables Reflective Revision--the modification of one's theories and action plans as a result of awareness of inconsistencies between theories and data, and action plans and goals.
NASA Astrophysics Data System (ADS)
Uprety, M.; Dugar, S.; Gautam, D.; Kanel, D.; Kshetri, M.; Kharbuja, R. G.; Acharya, S. H.
2017-12-01
Advances in flood forecasting have provided opportunities for humanitarian responders to employ a range of preparedness activities at different forecast time horizons. Yet, the science of prediction is less understood and realized across the humanitarian landscape, and often preparedness plans are based upon average level of flood risk. Working under the remit of Forecast Based Financing (FbF), we present a pilot from Nepal on how available flood and weather forecast products are informing specific pre-emptive actions in the local preparedness and response plans, thereby supporting government stakeholders and humanitarian agencies to take early actions before an impending flood event. In Nepal, forecasting capabilities are limited but in a state of positive flux. Whilst local flood forecasts based upon rainfall-runoff models are yet to be operationalized, streamflow predictions from Global Flood Awareness System (GLoFAS) can be utilized to plan and implement preparedness activities several days in advance. Likewise, 3-day rainfall forecasts from Nepal Department of Hydrology and Meteorology (DHM) can further inform specific set of early actions for potential flash floods due to heavy precipitation. Existing community based early warning systems in the major river basins of Nepal are utilizing real time monitoring of water levels and rainfall together with localised probabilistic flood forecasts which has increased warning lead time from 2-3 hours to 7-8 hours. Based on these available forecast products, thresholds and trigger levels have been determined for different flood scenarios. Matching these trigger levels and assigning responsibilities to relevant actors for early actions, a set of standard operating procedures (SOPs) are being developed, broadly covering general preparedness activities and science informed anticipatory actions for different forecast lead times followed by the immediate response activities. These SOPs are currently being rolled out and tested by the Ministry of Home Affairs (MoHA) through its district emergency operation centres in West Nepal. Potential scale up and successful implementation of this science based approach would be instrumental to take forward global commitments on disaster risk reduction, climate change adaptation and sustainable goals in Nepal.
Sudore, Rebecca L.; Stewart, Anita L.; Knight, Sara J.; McMahan, Ryan D.; Feuz, Mariko; Miao, Yinghui; Barnes, Deborah E.
2013-01-01
Introduction Advance directives have traditionally been considered the gold standard for advance care planning. However, recent evidence suggests that advance care planning involves a series of multiple discrete behaviors for which people are in varying stages of behavior change. The goal of our study was to develop and validate a survey to measure the full advance care planning process. Methods The Advance Care Planning Engagement Survey assesses “Process Measures” of factors known from Behavior Change Theory to affect behavior (knowledge, contemplation, self-efficacy, and readiness, using 5-point Likert scales) and “Action Measures” (yes/no) of multiple behaviors related to surrogate decision makers, values and quality of life, flexibility for surrogate decision making, and informed decision making. We administered surveys at baseline and 1 week later to 50 diverse, older adults from San Francisco hospitals. Internal consistency reliability of Process Measures was assessed using Cronbach's alpha (only continuous variables) and test-retest reliability of Process and Action Measures was examined using intraclass correlations. For discriminant validity, we compared Process and Action Measure scores between this cohort and 20 healthy college students (mean age 23.2 years, SD 2.7). Results Mean age was 69.3 (SD 10.5) and 42% were non-White. The survey took a mean of 21.4 minutes (±6.2) to administer. The survey had good internal consistency (Process Measures Cronbach's alpha, 0.94) and test-retest reliability (Process Measures intraclass correlation, 0.70; Action Measures, 0.87). Both Process and Action Measure scores were higher in the older than younger group, p<.001. Conclusion A new Advance Care Planning Engagement Survey that measures behavior change (knowledge, contemplation, self-efficacy, and readiness) and multiple advance care planning actions demonstrates good reliability and validity. Further research is needed to assess whether survey scores improve in response to advance care planning interventions and whether scores are associated with receipt of care consistent with one's wishes. PMID:24039772
Luo, Chewe; Hirnschall, Gottfried; Rodrigues, Jessica; Romano, Sostena; Essajee, Shaffiq; Rogers, Braeden; McCarthy, Elizabeth; Mwango, Albert; Sangrujee, Nalinee; Adler, Michelle R; Houston, James C; Langa, Judite O; Urso, Marilena; Bolu, Omotayo; Tene, Gilbert; Elat Nfetam, Jean B; Kembou, Etienne; Phelps, Benjamin R
2017-05-01
While the Interagency Task Team on the Prevention and Treatment of HIV Infection in Pregnant Women, Mothers, and Children (IATT) partnership existed before the Global Plan Towards the Elimination of New HIV Infections Among Children by 2015 and Keeping Their Mothers Alive (Global Plan), its reconfiguration was critical to coordinating provision of technical assistance that positively influenced country decision-making and program performance. This article describes how the Global Plan anchored the work of the IATT and, in turn, how the IATT's technical assistance helped to accelerate achievement of the Global Plan targets and milestones. The technical assistance that will be discussed addressed a broad range of priority actions and milestones described in the Global Plan: (1) planning for and implementing Option B+; (2) strengthening monitoring and evaluation systems; (3) translating evidence into action and advocacy; and (4) promoting community engagement. This article also reviews the ongoing challenges and opportunities of providing technical assistance in a rapidly evolving environment that calls for ever more flexible and contextualized responses. The effectiveness of technical assistance facilitated by the IATT was defined by its timeliness, evidence base, and unique global perspective that built on the competencies of its partners and promoted synergies across program areas. Reaching the final goal of eliminating vertical transmission of HIV infection and achieving an AIDS-free generation in countries with the highest HIV burden requires that the IATT partnership and technical assistance remain responsive to country-specific needs while aligning with the current programmatic reality and new global goals such as the Sustainable Development Goals and 90-90-90 targets.
The Federal Research Action Plan on Recycled Tire Crumb Used on Playing Fields and Playgrounds (FRAP), released in February 2016, is a multi-agency research plan in response to concerns over the use of tire crumb rubber as infill on synthetic turf fields. The FRAP outlines specif...
Higher Education. Lifelong Learning and Community Service: A Profile of Action and Responsibility.
ERIC Educational Resources Information Center
Champagne, Joseph E.
Two projects, designed to serve as technical input to the developing Texas State Plan for Higher Continuing Education, focused on: (1) enrollment trends and needs, institutional activities, and statewide planning across the nation; and (2) higher education and community services. Both projects involved extensive survey work of institutional visits…
Manpower Planning for Wastewater Treatment Plants.
ERIC Educational Resources Information Center
Davies, J. Kenneth; And Others
This document discusses the components necessary in the development of a forecasting process by which manpower needs can be determined and the development of action programs by which the projected needs may be satisfied. The primary focus of this manual is directed at that person in a state agency who has the responsibility for planning the…
Children's Visual Processing of Egocentric Cues in Action Planning for Reach
ERIC Educational Resources Information Center
Cordova, Alberto; Gabbard, Carl
2011-01-01
In this study the authors examined children's ability to code visual information into an egocentric frame of reference for planning reach movements. Children and adults estimated reach distance via motor imagery in immediate and response-delay conditions. Actual maximum reach was compared to estimates in multiple locations in peripersonal and…
Code of Federal Regulations, 2010 CFR
2010-07-01
... COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN State... either assume the lead through a cooperative agreement for the response action or may be the support agency in EPA-lead remedial response. Section 300.515 sets forth requirements for state involvement in...
29 CFR 11.3 - Responsible agency officials.
Code of Federal Regulations, 2010 CFR
2010-07-01
... considered in the planning of agency actions and in the making of decisions and that the alternatives... advising private applicants, or other non-Federal entities, of the possible need for information...), agency heads will also be responsible for assuring the quality of environmental impact statements...
49 CFR 234.103 - Timely response to report of malfunction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Timely response to report of malfunction. 234.103 Section 234.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS...
49 CFR 234.103 - Timely response to report of malfunction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Timely response to report of malfunction. 234.103 Section 234.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS...
49 CFR 234.103 - Timely response to report of malfunction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Timely response to report of malfunction. 234.103 Section 234.103 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS...
Situational analysis: preliminary regional review of the Mental Health Atlas 2014.
Gater, R; Chew, Z; Saeed, K
2015-09-28
The WHO comprehensive Mental Health Action Plan 2013-2020 established goals and objectives that Member States have agreed to meet by 2020. To update the Atlas of Mental Health 2011, specific indicators from the Mental Health Action Plan and additional indicators on service coverage were incorporated into the questionnaire for the Atlas 2014. The data will help facilitate improvement in information gathering and focus efforts towards implementation of the Mental Health Action Plan. The questionnaire was completed by the national mental health focal point of each country. This preliminary review seeks to consolidate data from the initial response to the Atlas 2014 questionnaire by Member States in the Eastern Mediterranean Region. Data for this review were analysed for the whole Region, by health systems groupings and by individual countries. Where possible, data are compared with the Mental Health Atlas 2011 to give a longitudinal perspective.
Responding to abuse: Children's experiences of child protection in a central district, Uganda.
Child, Jennifer Christine; Naker, Dipak; Horton, Jennifer; Walakira, Eddy Joshua; Devries, Karen M
2014-10-01
Part of a comprehensive response to violence against children involves child protection systems, but there are few data available on such systems in low-income countries. This study describes the characteristics and help seeking behavior of children referred to local child protection services and the quality of the first-line response in one district in Uganda. Participants included 3,706 children from 42 primary schools who participated in a baseline survey on violence as part of the Good Schools Study (NCT01678846, clinicaltrial.gov). Children who disclosed violence were referred according to predefined criteria based on the type, severity, and timeframe of their experiences. Children were followed up to 4 months after the study ended. First-line responses by receiving agencies were classified into 3 categories: plan for action only, some action taken, and no plan and no action taken. Appropriateness of responses was based on which agency responded, timeliness of the response, quality of the documentation, and final status of the case. From the baseline survey, 529 children (14%) were referred. Girls were more likely to be referred and to meet the criteria for a serious case (9% girls, 4% boys). In total, 104 referrals (20%) had some kind of concrete action taken, but only 20 (3.8%) cases met all criteria for having received an adequate response. Nearly half (43%) of referred children had ever sought help by disclosing their experiences of violence prior to the baseline survey. In our study areas, the first-line response to children's reports of abuse was poor even though some referral structures are in place. Copyright © 2014 Elsevier Ltd. All rights reserved.
Action video game training reduces the Simon Effect.
Hutchinson, Claire V; Barrett, Doug J K; Nitka, Aleksander; Raynes, Kerry
2016-04-01
A number of studies have shown that training on action video games improves various aspects of visual cognition including selective attention and inhibitory control. Here, we demonstrate that action video game play can also reduce the Simon Effect, and, hence, may have the potential to improve response selection during the planning and execution of goal-directed action. Non-game-players were randomly assigned to one of four groups; two trained on a first-person-shooter game (Call of Duty) on either Microsoft Xbox or Nintendo DS, one trained on a visual training game for Nintendo DS, and a control group who received no training. Response times were used to contrast performance before and after training on a behavioral assay designed to manipulate stimulus-response compatibility (the Simon Task). The results revealed significantly faster response times and a reduced cost of stimulus-response incompatibility in the groups trained on the first-person-shooter game. No benefit of training was observed in the control group or the group trained on the visual training game. These findings are consistent with previous evidence that action game play elicits plastic changes in the neural circuits that serve attentional control, and suggest training may facilitate goal-directed action by improving players' ability to resolve conflict during response selection and execution.
Participatory approach in planning for low carbon and eco-village: A case of Felda Taib Andak
NASA Astrophysics Data System (ADS)
Ngah, I.; Zulkifli, A. S.
2014-02-01
Participatory approaches have becoming an important tool in planning of sustainable communities. Although participation is conceived as a malleable concept there are certain methods that planners can adopt to ensure a meaningful participation. This paper will provide some experiences and lessons on how participatory planning could be carried out with local people, the role of planners in the process of plan preparation, implementation and the outcome. This paper first explores some of the meanings of participation, the criteria of participation and the approaches of participation in planning for sustainable community. The second part is a description and discussion of how participatory approach in planning was applied in planning for low carbon and eco-village in Iskandar Malaysia based on a case study of planning of Felda Taib Andak scheme. The participatory approach involved a series of meetings, site visit and focus group discussions with representative of the Felda Village to come out with action plan and actual implementation. From focus group discussions a roadmap consisted of a vision and objectives and a dozen actions were formulated and adopted. In the process of implementation the main implementation & coordination committee was form in which the author (planner) is one of its members to look into fund raising & implementation strategies together with the local people. Several task forces or sub committees responsible to implement the dozen actions were also formed. The outcome was encouraging in which some of the actions such as planting of bamboo trees, reduction of pollution from oil palm factory and bicycling activities has been implemented and shown progress. The paper also highlights some of the issues and challenges in participatory planning.
Master environmental plan for Fort Devens, Massachusetts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biang, C.A.; Peters, R.W.; Pearl, R.H.
Argonne National Laboratory has prepared a master environmental plan (MEP) for Fort Devens, Massachusetts, for the US Army Toxic and Hazardous Materials Agency. The MEP is an assessment based on environmental laws and regulations of both the federal government and the Commonwealth of Massachusetts. The MEP assess the physical and environmental status of 58 potential hazardous waste sites, including 54 study areas (SAs) that pose a potential for releasing contamination into the environment and 4 areas of concern (AOCs) that are known to have substantial contamination. For each SA or AOC, this MEP describes the known history and environment, identifiesmore » additional data needs, and proposes possible response actions. Most recommended response actions consist of environmental sampling and monitoring and other characterization studies. 74 refs., 63 figs., 50 tabs.« less
Can persuasive messages encourage individuals to create action plans for physical activity?
Sweet, Shane N; Brawley, Lawrence R; Hatchell, Alexandra; Gainforth, Heather L; Latimer-Cheung, Amy E
2014-08-01
Given the positive influence of action planning on physical activity, persuasive messages could be designed to promote action planning. The purpose of this paper was to test action planning messages in two studies. Participants were allocated to one of two message groups, reading either a physical activity only or physical activity plus action planning message (Study 1) and either a gain-framed or loss-framed action planning message (Study 2). The percent of individuals who created an action plan and the quality of the plans were evaluated. In Study 1, individuals in the physical activity plus action planning group created as many action plans as the physical activity only group, but their plans were higher quality. In Study 2, Week 2 differences between the gain- and loss-framed message groups were found for action planning. To our knowledge, these studies were the first to investigate message-induced action planning as a behavior. More research is needed to optimize these messages.
Radiological emergency: Malaysian preparedness and response.
Yusof, Mohd Abd Wahab; Ali, Hamrah Mohd
2011-07-01
Planning and preparation in advance for radiological emergencies can help to minimise potential public health and environmental threats if and when an actual emergency occurs. During the planning process, emergency response organisations think through how they would respond to each type of incident and the resources that will be needed. In Malaysia, planning, preparation for and response to radiological emergencies involve many parties. In the event of a radiological emergency and if it is considered a disaster, the National Security Council, the Atomic Energy Licensing Board and the Malaysian Nuclear Agency (Nuclear Malaysia) will work together with other federal agencies, state and local governments, first responders and international organisations to monitor the situation, contain the release, and clean up the contaminated site. Throughout the response, these agencies use their protective action guidelines. This paper discusses Malaysian preparedness for, and response to, any potential radiological emergency.
ERIC Educational Resources Information Center
Mehra, Bharat; Bishop, Bradley Wade; Partee, Robert P., II.
2018-01-01
This article explores a case methodology of action research in Tennessee and investigates how library and information science (LIS) educators can extend their social responsibility to the state's small businesses and rural public libraries. Insights are drawn from a planning grant that was recently awarded by the Institute of Museum and Library…
40 CFR 300.440 - Procedures for planning and implementing off-site response actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... under section 311 of the Clean Water Act where the release poses an immediate and significant threat to... to CERCLA wastes from cleanup actions based on CERCLA decision documents signed or consent decrees lodged after October 17, 1986 (“post-SARA CERCLA wastes”) as well as those based on CERCLA decision...
ERIC Educational Resources Information Center
Underhill, Dyan Whitlow
2012-01-01
Multiple incidents of postsecondary school shooting violence have occurred in American society--prompting concern about safety on college campuses, administrators' roles in prevention, and proactive and responsible bystander actions. Active shooter plans have become more established in educational environments, with efforts are directed…
A Computational Model of Inhibitory Control in Frontal Cortex and Basal Ganglia
ERIC Educational Resources Information Center
Wiecki, Thomas V.; Frank, Michael J.
2013-01-01
Planning and executing volitional actions in the face of conflicting habitual responses is a critical aspect of human behavior. At the core of the interplay between these 2 control systems lies an override mechanism that can suppress the habitual action selection process and allow executive control to take over. Here, we construct a neural circuit…
12 CFR 1777.11 - Supervisory response.
Code of Federal Regulations, 2011 CFR
2011-01-01
... section is warranted. (c) Level III supervisory response—(1) Action plan. In addition to any other... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Supervisory response. 1777.11 Section 1777.11 Banks and Banking OFFICE OF FEDERAL HOUSING ENTERPRISE OVERSIGHT, DEPARTMENT OF HOUSING AND URBAN...
12 CFR 1777.11 - Supervisory response.
Code of Federal Regulations, 2012 CFR
2012-01-01
... section is warranted. (c) Level III supervisory response—(1) Action plan. In addition to any other... 12 Banks and Banking 9 2012-01-01 2012-01-01 false Supervisory response. 1777.11 Section 1777.11 Banks and Banking OFFICE OF FEDERAL HOUSING ENTERPRISE OVERSIGHT, DEPARTMENT OF HOUSING AND URBAN...
The national response for preventing healthcare-associated infections: infrastructure development.
Mendel, Peter; Siegel, Sari; Leuschner, Kristin J; Gall, Elizabeth M; Weinberg, Daniel A; Kahn, Katherine L
2014-02-01
In 2009, the US Department of Health and Human Services (HHS) launched the Action Plan to Prevent Healthcare-associated Infections (HAIs). The Action Plan adopted national targets for reduction of specific infections, making HHS accountable for change across the healthcare system over which federal agencies have limited control. This article examines the unique infrastructure developed through the Action Plan to support adoption of HAI prevention practices. Interviews of federal (n=32) and other stakeholders (n=38), reviews of agency documents and journal articles (n=260), and observations of interagency meetings (n=17) and multistakeholder conferences (n=17) over a 3-year evaluation period. We extract key progress and challenges in the development of national HAI prevention infrastructure--1 of the 4 system functions in our evaluation framework encompassing regulation, payment systems, safety culture, and dissemination and technical assistance. We then identify system properties--for example, coordination and alignment, accountability and incentives, etc.--that enabled or hindered progress within each key development. The Action Plan has developed a model of interagency coordination (including a dedicated "home" and culture of cooperation) at the federal level and infrastructure for stimulating change through the wider healthcare system (including transparency and financial incentives, support of state and regional HAI prevention capacity, changes in safety culture, and mechanisms for stakeholder engagement). Significant challenges to infrastructure development included many related to the same areas of progress. The Action Plan has built a foundation of infrastructure to expand prevention of HAIs and presents useful lessons for other large-scale improvement initiatives.
32 CFR 813.3 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... component and joint commands with deliberate and crisis action planning for USAF's COMCAM assets. (6... and 2, and AFI 31-401, Information Security Program Management. The authority in charge of the event...
48 CFR 2901.603-70 - Responsibility of other government personnel.
Code of Federal Regulations, 2012 CFR
2012-10-01
... LABOR GENERAL DEPARTMENT OF LABOR ACQUISITION REGULATION SYSTEM Career Development, Contracting.... This will be mutually beneficial in terms of better planning for acquisition action and more timely...
48 CFR 2901.603-70 - Responsibility of other government personnel.
Code of Federal Regulations, 2014 CFR
2014-10-01
... LABOR GENERAL DEPARTMENT OF LABOR ACQUISITION REGULATION SYSTEM Career Development, Contracting.... This will be mutually beneficial in terms of better planning for acquisition action and more timely...
48 CFR 2901.603-70 - Responsibility of other government personnel.
Code of Federal Regulations, 2013 CFR
2013-10-01
... LABOR GENERAL DEPARTMENT OF LABOR ACQUISITION REGULATION SYSTEM Career Development, Contracting.... This will be mutually beneficial in terms of better planning for acquisition action and more timely...
Defense.gov - Special Report: VOTE
Voting Action Plan (pdf) 2013 USMC Voting Action Plan (pdf) 2013 Army Voting Action Plan (pdf) Air Force Voting Plan 2012-13 (pdf) Army Voting Action Plan 2012 (pdf) Marine Corps Voting Action Plan 2012 (pdf ) Navy Voting Action Plan (pdf) Overseas Vote Foundation Project Vote Smart Preparing for the 2012
Standardized emergency management system and response to a smallpox emergency.
Kim-Farley, Robert J; Celentano, John T; Gunter, Carol; Jones, Jessica W; Stone, Rogelio A; Aller, Raymond D; Mascola, Laurene; Grigsby, Sharon F; Fielding, Jonathan E
2003-01-01
The smallpox virus is a high-priority, Category-A agent that poses a global, terrorism security risk because it: (1) easily can be disseminated and transmitted from person to person; (2) results in high mortality rates and has the potential for a major public health impact; (3) might cause public panic and social disruption; and (4) requires special action for public health preparedness. In recognition of this risk, the Los Angeles County Department of Health Services (LAC-DHS) developed the Smallpox Preparedness, Response, and Recovery Plan for LAC to prepare for the possibility of an outbreak of smallpox. A unique feature of the LAC-DHS plan is its explicit use of the Standardized Emergency Management System (SEMS) framework for detailing the functions needed to respond to a smallpox emergency. The SEMS includes the Incident Command System (ICS) structure (management, operations, planning/intelligence, logistics, and finance/administration), the mutual-aid system, and the multi/interagency coordination required during a smallpox emergency. Management for incident command includes setting objectives and priorities, information (risk communications), safety, and liaison. Operations includes control and containment of a smallpox outbreak including ring vaccination, mass vaccination, adverse events monitoring and assessment, management of confirmed and suspected smallpox cases, contact tracing, active surveillance teams and enhanced hospital-based surveillance, and decontamination. Planning/intelligence functions include developing the incident action plan, epidemiological investigation and analysis of smallpox cases, and epidemiological assessment of the vaccination coverage status of populations at risk. Logistics functions include receiving, handling, inventorying, and distributing smallpox vaccine and vaccination clinic supplies; personnel; transportation; communications; and health care of personnel. Finally, finance/administration functions include monitoring costs related to the smallpox emergency, procurement, and administrative aspects that are not handled by other functional divisions of incident command systems. The plan was developed and is under frequent review by the LAC-DHS Smallpox Planning Working Group, and is reviewed periodically by the LAC Bioterrorism Advisory Committee, and draws upon the Smallpox Response Plan and Guidelines of the Centers for Disease Control and Prevention (CDC) and recommendations of the Advisory Committee on Immunization Practices (ACIP). The Smallpox Preparedness, Response, and Recovery Plan, with its SEMS framework and ICS structure, now is serving as a model for the development of LAC-DHS plans for responses to other terrorist or natural-outbreak responses.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Monitoring Activities for F-Area Tank Farm at the Savannah River Site, Revision 0 AGENCY: Nuclear Regulatory... carrying out its responsibilities for monitoring DOE's waste disposal activities at the F-Area Tank Farm at... the availability of ``U.S. Nuclear Regulatory Commission Plan for Monitoring Disposal Actions Taken by...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
... for OMB Review; Comment Request; Information Collection Plan for GovBenefits Online ACTION: Notice... Collection Plan for GovBenefits Online,'' to the Office of Management and Budget (OMB) for review and... response, and estimated total burden may be obtained from the RegInfo.gov Web site, http://www.reginfo.gov...
40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...
40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...
40 CFR 35.4155 - How does EPA decide whether to award a TAG to our group?
Code of Federal Regulations, 2014 CFR
2014-07-01
... and individuals affected by the site; (b) Your group's plans to use the services of a technical advisor throughout the Superfund response action; and (c) Your group's ability and plan to inform others... GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Technical Assistance How to...
Mass Fatality Planning and Religious Considerations Act
Rep. Richardson, Laura [D-CA-37
2012-09-28
House - 10/11/2012 Referred to the Subcommittee on Emergency Preparedness, Response and Communications. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Announcements under Renewable Fuel Standard
RFS program announcements are posted below by the calendar year in which the action was posted. Announcements will include rulemakings, responses to petitions, new pathway approvals, compliance deadlines, alternative plans, and among others.
18 CFR 415.3 - Purpose and findings.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) Land and water use regulations of responsible units of government shall not impair or conflict with the.... (9) Plans for land and water use adopted by responsible agencies shall not impair or conflict with these flood plain use standards. (10) No action of any unit of government shall impair or conflict with...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-06-03
This Decision Document discusses the selection of no further action as the recommended action for four sites located at the Oliktok Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the eight sites located at the Oliktok Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, four sites are recommended for no further action.
Code of Federal Regulations, 2010 CFR
2010-04-01
...-requested recall, the firm that has primary responsibility for the manufacture and marketing of the product... or use. (l) Recall strategy means a planned specific course of action to be taken in conducting a...
Elementary and Secondary School Emergency Preparedness Planning Act
Rep. Richardson, Laura [D-CA-37
2010-03-21
House - 04/05/2010 Referred to the Subcommittee on Emergency Communications, Preparedness, and Response. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-15
... taking? II. What is the effect of this action? III. What is EPA's response to comments? IV. What is EPA's... comments. In this action, EPA is responding to those adverse comments. II. What is the effect of this... no effect on control measures, or air quality, in the area. For example, contrary to Commenter's...
Bertagnolio, Silvia; Beanland, Rachel L; Jordan, Michael R; Doherty, Meg; Hirnschall, Gottfried
2017-12-01
The global community, including the World Health Organization (WHO), has committed to ending the AIDS epidemic and to ensuring that 90% of people living with human immunodeficiency virus (HIV) are diagnosed, 90% start treatment, and 90% achieve and maintain virological suppression. The emergence of HIV drug resistance (HIVDR) as antiretroviral treatment programs expand could preclude the 90-90-90 targets adopted by the United Nations General Assembly at the High-Level Meeting on Ending AIDS from being achieved. The Global Action Plan on HIVDR is a call for collective action grounded on normative guidance providing a standardized and robust approach to monitoring, preventing, and responding to HIVDR over the next 5 years (2017-2021). WHO is committed to supporting country, global, regional, and national partners to implement and monitor the progress of the Global Action Plan. This article outlines the key components of WHO's strategy to tackle HIVDR and the role the organization takes in leading the global response to HIVDR. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail: journals.permissions@oup.com.
The patient reporting and action for a safe environment (PRASE) intervention: a feasibility study.
O'Hara, Jane K; Lawton, Rebecca J; Armitage, Gerry; Sheard, Laura; Marsh, Claire; Cocks, Kim; McEachan, Rosie R C; Reynolds, Caroline; Watt, Ian; Wright, John
2016-11-28
There is growing interest in the role of patients in improving patient safety. One such role is providing feedback on the safety of their care. Here we describe the development and feasibility testing of an intervention that collects patient feedback on patient safety, brings together staff to consider this feedback and to plan improvement strategies. We address two research questions: i) to explore the feasibility of the process of systematically collecting feedback from patients about the safety of care as part of the PRASE intervention; and, ii) to explore the feasibility and acceptability of the PRASE intervention for staff, and to understand more about how staff use the patient feedback for service improvement. We conducted a feasibility study using a wait-list controlled design across six wards within an acute teaching hospital. Intervention wards were asked to participate in two cycles of the PRASE (Patient Reporting & Action for a Safe Environment) intervention across a six-month period. Participants were patients on participating wards. To explore the acceptability of the intervention for staff, observations of action planning meetings, interviews with a lead person for the intervention on each ward and recorded researcher reflections were analysed thematically and synthesised. Recruitment of patients using computer tablets at their bedside was straightforward, with the majority of patients willing and able to provide feedback. Randomisation of the intervention was acceptable to staff, with no evidence of differential response rates between intervention and control groups. In general, ward staff were positive about the use of patient feedback for service improvement and were able to use the feedback as a basis for action planning, although engagement with the process was variable. Gathering a multidisciplinary team together for action planning was found to be challenging, and implementing action plans was sometimes hindered by the need to co-ordinate action across multiple services. The PRASE intervention was found to be acceptable to staff and patients. However, before proceeding to a full cluster randomised controlled trial, the intervention requires adaptation to account for the difficulties in implementing action plans within three months, the need for a facilitator to support the action planning meetings, and the provision of training and senior management support for participating ward teams. The PRASE intervention represents a promising method for the systematic collection of patient feedback about the safety of hospital care.
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...) Written and oral emergency action plans. An emergency action plan must be in writing, kept in the...
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this...) Written and oral emergency action plans. An emergency action plan must be in writing, kept in the...
Roberts, R. Edward; Husain, Masud
2015-01-01
Introduction Although the pre-supplementary motor area (pre-SMA) is one of the most frequently reported areas of activation in functional imaging studies, the role of this brain region in cognition is still a matter of intense debate. Here we present a patient with a focal lesion of caudal pre-SMA who displays a selective deficit in updating a response plan to switch actions, but shows no impairment when required to withhold a response – stopping. Materials & methods The patient and a control group underwent three tasks designed to measure different aspects of cognitive control and executive function. Results The pre-SMA patient displayed no impairment when responding in the face of distracting stimuli (Eriksen flanker paradigm), or when required to halt an on-going response (STOP task). However, a specific deficit was observed when she was required to rapidly switch between response plans (CHANGE task). Conclusions These findings suggest that the caudal pre-SMA may have a particularly important role in a network of brain regions required for rapidly updating and implementing response plans. The lack of any significant impairment on other measures of cognitive control suggests that this is not likely due to a global deficit in cognitive control. We discuss the implications of these results in the context of current theories of pre-SMA function. PMID:25282056
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... Indiana Department of Environmental Management (IDEM), has determined that all appropriate response actions under CERCLA, other than operation, maintenance, and five-year reviews have been completed...
12 CFR 1710.15 - Conduct and responsibilities of board of directors.
Code of Federal Regulations, 2010 CFR
2010-01-01
... in place adequate policies and procedures to assure its oversight of, among other matters, the following: (1) Corporate strategy, major plans of action, risk policy, programs for legal and regulatory...
Response to Request for Correction 10001
Reponse to the Phthalate Esters Panel of the American Chemistry Council, in which the EPA concludes that the underlying information and conclusions presented in the Phthalates Action Plan are objective and of high quality.
Preparedness and response to terrorism: a framework for public health action.
Gofin, Rosa
2005-02-01
Political group violence in the form of terrorist actions has become a reality worldwide, affecting the health and economies of populations. As a consequence, preparedness and response are becoming an integral part of public health action. Risk appraisal, preservation of human and civil rights and communications within and between countries are all issues to be considered in the process. The combination of the natural history of terrorist actions and the epidemiological triangle model has been adapted in this paper and suggested as a comprehensive approach for preparedness and action. It covers preparedness (pre-event), response (event) and the consequences (post-event) of a terrorist attack. It takes into account the human factor, vectors and environment involved in each one of the phases. Terrorism is a global reality with varying underlying causes, manifestations and impact on the health of the public. Preparedness, response and rehabilitation are an integral part of public health action. Consideration of the pre-event, event and post-event phases in terrorist actions, together with the human factor, vector/agent and environment in each of these phases, offers a framework for public health preparedness, response and rehabilitation. Planning should consider risk assessment, risk communication, inter-sectorial cooperation, enactment of laws and regulations which consider protection of the public's health and civil liberties. Allocation of resources would need to make allowance for maintenance and development of ongoing public health activities.
Pelgrim, E A M; Kramer, A W M; Mokkink, H G A; van der Vleuten, C P M
2013-09-01
Although the literature suggests that reflection has a positive impact on learning, there is a paucity of evidence to support this notion. We investigated feedback and reflection in relation to the likelihood that feedback will be used to inform action plans. We hypothesised that feedback and reflection present a cumulative sequence (i.e. trainers only pay attention to trainees' reflections when they provided specific feedback) and we hypothesised a supplementary effect of reflection. We analysed copies of assessment forms containing trainees' reflections and trainers' feedback on observed clinical performance. We determined whether the response patterns revealed cumulative sequences in line with the Guttman scale. We further examined the relationship between reflection, feedback and the mean number of specific comments related to an action plan (ANOVA) and we calculated two effect sizes. Both hypotheses were confirmed by the results. The response pattern found showed an almost perfect fit with the Guttman scale (0.99) and reflection seems to have supplementary effect on the variable action plan. Reflection only occurs when a trainer has provided specific feedback; trainees who reflect on their performance are more likely to make use of feedback. These results confirm findings and suggestions reported in the literature.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Notice of availability and request for public comment..., Division of Reproductive Health, Attn: National Public Health Action Plan for the Detection, Prevention...
76 FR 14402 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... requesting public comment on the draft A Public Health Action Plan to Combat Antimicrobial Resistance. HHS...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Action plan. 72.13 Section 72... AND RECREATION RECOVERY ACT OF 1978 Local Recovery Action Programs § 72.13 Action plan. The purpose of the Assessment is to provide background and justification for an Action Plan. The Action Plan, which...
76 FR 21907 - Draft Action Plan-A Public Health Action Plan To Combat Antimicrobial Resistance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
...-2011-0002] Draft Action Plan--A Public Health Action Plan To Combat Antimicrobial Resistance AGENCY: Centers for Disease Control and Prevention (CDC), Department of Health and Human Services (DHHS). ACTION... Federal Register requesting public comment on the draft, A Public Health Action Plan to Combat...
1983-12-01
AS REnITIR 6. Rotarywing.hea ...... ................ ..... cRR( PnPR mOVmIENT 7. Drop tank pumps and indicators (SH--3H...POSE the rotor head. 9. ACTION: Watch forn Captain_ fr sigPlan Catain.lean 10. RESPONSE: Stycycin contrl andk checks for__retonse clea and the____...cyclic forward and to the left ’- and slowly pump te collec z v. 2. RESPONSE: watch for 1/8 revolution of rotary wing- 1. ACTION: Check head area clear1
Response Action Plan for the Basin F Interim Response Action Waste Pile.
1992-10-01
the Waste Pile via an 8-Inch diameter HDPE stand pipe. A stainless - steel submersible pump provides the lift to deliver the collected liquid 5 to the...2.1.4 Settlement Measuring System 3 Nine settlement plates were installed at the base of the Waste Pile during its construction. A 1-Inch steel pipe...PLATE STEEL CONDUIT. PIPE GS: 5219.61 GS: 5219.98 GS: 5219.56 GS: 5219.50 SPSP: 5217.87 SPSP: 5217.94 SPSP: 5218.59 THP: 5221.25 THP: 5221.41 THP
Climate Action Planning Process | Climate Neutral Research Campuses | NREL
Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b... outcome measures for activities included in its action plan in accordance with guidance issued by HUD. For...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b... to be undertaken. The action plan must provide a description of the activities the jurisdiction will...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.220 Section 91.220... Consolidated Plan § 91.220 Action plan. The action plan must include the following: (a) Standard Form 424; (b... to be undertaken. The action plan must provide a description of the activities the jurisdiction will...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.320 Section 91.320... Consolidated Plan § 91.320 Action plan. The action plan must include the following: (a) Standard Form 424; (b... outcome measures for activities included in its action plan in accordance with guidance issued by HUD. For...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and activities...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Action plan. 91.420 Section 91.420... Plan § 91.420 Action plan. (a) Form application. The action plan for the consortium must include a...) Description of resources and activities. The action plan must describe the resources to be used and activities...
Thunis, P; Degraeuwe, B; Pisoni, E; Meleux, F; Clappier, A
2017-01-01
Regional and local authorities have the obligation to design air quality plans and assess their impacts when concentration levels exceed the limit values. Because these limit values cover both short- (day) and long-term (year) effects, air quality plans also follow these two formats. In this work, we propose a methodology to analyze modeled air quality forecast results, looking at emission reduction for different sectors (residential, transport, agriculture, etc.) with the aim of supporting policy makers in assessing the impact of short-term action plans. Regarding PM 10 , results highlight the diversity of responses across European cities, in terms of magnitude and type that raises the necessity of designing area-specific air quality plans. Action plans extended from 1 to 3 days (i.e., emissions reductions applied for 24 and 72 h, respectively) point to the added value of trans-city coordinated actions. The largest benefits are seen in central Europe (Vienna, Prague) while major cities (e.g., Paris) already solve a large part of the problem on their own. Eastern Europe would particularly benefit from plans based on emission reduction in the residential sectors; while in northern cities, agriculture seems to be the key sector on which to focus attention. Transport is playing a key role in most cities whereas the impact of industry is limited to a few cities in south-eastern Europe. For NO 2 , short-term action plans focusing on traffic emission reductions are efficient in all cities. This is due to the local character of this type of pollution. It is important, however, to stress that these results remain dependent on the selected months available for this study.
Nishimura, Akio; Yokosawa, Kazuhiko
2010-03-01
Perceiving a visual stimulus is hampered when the stimulus is compatible with simultaneously prepared or executed action (blindness effect). We explored the roles of the effector identity of the responding hand and of orthogonal compatibility (above-right/below-left correspondence) in the blindness effect. In Experiment 1, participants conducted bimanual key presses with vertically arranged responses while perceiving a brief presentation of rightward or leftward arrowheads. A blindness effect based on the effector identity did emerge, but only with the above-right/below-left key-hand arrangement. An orthogonal blindness effect was not found in Experiment 2 with a horizontal key-press action task and a vertical arrowhead perception task. We concluded that the anatomical identity of the responding hand was not integrated into the action plan with an orthogonally incompatible key-hand arrangement. The findings are discussed in terms of the generality and limits of the blindness effect, and hierarchical response coding.
Bianco, R; Novembre, G; Keller, P E; Villringer, A; Sammler, D
2018-04-01
It is well established that musical training induces sensorimotor plasticity. However, there are remarkable differences in how musicians train for proficient stage performance. The present EEG study outlines for the first time clear-cut neurobiological differences between classical and jazz musicians at high and low levels of action planning, revealing genre-specific cognitive strategies adopted in production. Pianists imitated chord progressions without sound that were manipulated in terms of harmony and context length to assess high-level planning of sequence-structure, and in terms of the manner of playing to assess low-level parameter specification of single acts. Jazz pianists revised incongruent harmonies faster as revealed by an earlier reprogramming negativity and beta power decrease, hence neutralising response costs, albeit at the expense of a higher number of manner errors. Classical pianists in turn experienced more conflict during incongruent harmony, as shown by theta power increase, but were more ready to implement the required manner of playing, as indicated by higher accuracy and beta power decrease. These findings demonstrate that specific demands and action focus of training lead to differential weighting of hierarchical action planning. This suggests different enduring markers impressed in the brain when a musician practices one or the other style. Copyright © 2018 Elsevier Inc. All rights reserved.
Education issues in disaster medicine: summary and action plan.
Armour, S J; Bastone, P; Birnbaum, M; Garrett, C; Greenough, P G; Manni, C; Ninomiya, N; Renderos, J; Rottman, S; Sahni, P; Shih, C L; Siegel, D; Younggren, B
2001-01-01
Change must begin with education. Theme 8 explored issues that need attention in Disaster Medicine education. Details of the methods used are provided in the introductory paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. The chairs then presided over a workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. Main points developed during the presentations and discussion included: (1) formal education, (2) standardized definitions, (3) integration, (4) evaluation of programs and interventions, (5) international cooperation, (6) identifying the psychosocial consequences of disaster, (7) meaningful research, and (8) hazard, impact, risk and vulnerability analysis. Three main components of the action plans were identified as evaluation, research, and education. The action plans recommended that: (1) education on disasters should be formalized, (2) evaluation of education and interventions must be improved, and (3) meaningful research should be promulgated and published for use at multiple levels and that applied research techniques be the subject of future conferences. The one unanimous conclusion was that we need more and better education on the disaster phenomenon, both in its impacts and in our response to them. Such education must be increasingly evidence-based.
Spatial Learning and Action Planning in a Prefrontal Cortical Network Model
Martinet, Louis-Emmanuel; Sheynikhovich, Denis; Benchenane, Karim; Arleo, Angelo
2011-01-01
The interplay between hippocampus and prefrontal cortex (PFC) is fundamental to spatial cognition. Complementing hippocampal place coding, prefrontal representations provide more abstract and hierarchically organized memories suitable for decision making. We model a prefrontal network mediating distributed information processing for spatial learning and action planning. Specific connectivity and synaptic adaptation principles shape the recurrent dynamics of the network arranged in cortical minicolumns. We show how the PFC columnar organization is suitable for learning sparse topological-metrical representations from redundant hippocampal inputs. The recurrent nature of the network supports multilevel spatial processing, allowing structural features of the environment to be encoded. An activation diffusion mechanism spreads the neural activity through the column population leading to trajectory planning. The model provides a functional framework for interpreting the activity of PFC neurons recorded during navigation tasks. We illustrate the link from single unit activity to behavioral responses. The results suggest plausible neural mechanisms subserving the cognitive “insight” capability originally attributed to rodents by Tolman & Honzik. Our time course analysis of neural responses shows how the interaction between hippocampus and PFC can yield the encoding of manifold information pertinent to spatial planning, including prospective coding and distance-to-goal correlates. PMID:21625569
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-27
...-2012-0004] Draft Public Health Action Plan--A National Public Health Action Plan for the Detection...), Department of Health and Human Services (HHS). ACTION: Extension of public comment period. SUMMARY: On May 16... National Public Health Action Plan for the Detection, Prevention, and Management of Infertility (77 FR...
Code of Federal Regulations, 2010 CFR
2010-07-01
... coordinator responsible for overseeing or directing those actions. (4) The organizational structure that will... the organizational structure identified in paragraph (d)(4) of this section. (e) List of contacts. The... shore-based personnel. (3) The procedures for notifying the qualified individuals designated by the...
49 CFR 234.109 - Recordkeeping.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.109 - Recordkeeping.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.106 - Partial activation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.101 - Employee notification rules.
Code of Federal Regulations, 2014 CFR
2014-10-01
....101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at...
49 CFR 234.107 - False activation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.105 - Activation failure.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.101 - Employee notification rules.
Code of Federal Regulations, 2012 CFR
2012-10-01
....101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at...
49 CFR 234.107 - False activation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.107 - False activation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.106 - Partial activation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.101 - Employee notification rules.
Code of Federal Regulations, 2013 CFR
2013-10-01
....101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at...
49 CFR 234.105 - Activation failure.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.109 - Recordkeeping.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.106 - Partial activation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
49 CFR 234.105 - Activation failure.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SAFETY, INCLUDING SIGNAL SYSTEMS, STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Response to Credible Reports of Warning System Malfunction at Highway-Rail...
Multi-Hazard School Disaster Planning and Response Act of 2013
Rep. Michaud, Michael H. [D-ME-2
2013-06-05
House - 07/15/2013 Referred to the Subcommittee on Crime, Terrorism, Homeland Security, and Investigations. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
7 CFR 275.16 - Corrective action planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
Market-stage analysis enhances strategic planning.
McDonald, R B
1998-07-01
Changing market conditions are challenging healthcare organizations to determine how to allocate resources and make operational planning decisions to prepare for future changes. A vital part of meeting these challenges is understanding the impact of market stages, and using that knowledge to build effective business strategies. Financial modeling that includes market-stage information provides insight into market opportunities and presents a clearer picture of the organizational changes that will need to be implemented at each stage. Effective strategic action should take into account critical success factors in market responsiveness, organizational responsiveness, operational effectiveness, and financial strength.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... help FDA in developing an enforcement action plan. FDA is seeking input on a number of specific issues... generally and to reduce tobacco use by minors. Tobacco products are responsible for more than 440,000 deaths... other things, that the use of tobacco products by children is a pediatric disease and virtually all new...
Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration. Division of Fish and Wildlife.
1988-11-01
The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less
A framework for responding to coral disease outbreaks that facilitates adaptive management.
Beeden, Roger; Maynard, Jeffrey A; Marshall, Paul A; Heron, Scott F; Willis, Bette L
2012-01-01
Predicted increases in coral disease outbreaks associated with climate change have implications for coral reef ecosystems and the people and industries that depend on them. It is critical that coral reef managers understand these implications and have the ability to assess and reduce risk, detect and contain outbreaks, and monitor and minimise impacts. Here, we present a coral disease response framework that has four core components: (1) an early warning system, (2) a tiered impact assessment program, (3) scaled management actions and (4) a communication plan. The early warning system combines predictive tools that monitor the risk of outbreaks of temperature-dependent coral diseases with in situ observations provided by a network of observers who regularly report on coral health and reef state. Verified reports of an increase in disease prevalence trigger a tiered response of more detailed impact assessment, targeted research and/or management actions. The response is scaled to the risk posed by the outbreak, which is a function of the severity and spatial extent of the impacts. We review potential management actions to mitigate coral disease impacts and facilitate recovery, considering emerging strategies unique to coral disease and more established strategies to support reef resilience. We also describe approaches to communicating about coral disease outbreaks that will address common misperceptions and raise awareness of the coral disease threat. By adopting this framework, managers and researchers can establish a community of practice and can develop response plans for the management of coral disease outbreaks based on local needs. The collaborations between managers and researchers we suggest will enable adaptive management of disease impacts following evaluating the cost-effectiveness of emerging response actions and incrementally improving our understanding of outbreak causation.
A Framework for Responding to Coral Disease Outbreaks that Facilitates Adaptive Management
NASA Astrophysics Data System (ADS)
Beeden, Roger; Maynard, Jeffrey A.; Marshall, Paul A.; Heron, Scott F.; Willis, Bette L.
2012-01-01
Predicted increases in coral disease outbreaks associated with climate change have implications for coral reef ecosystems and the people and industries that depend on them. It is critical that coral reef managers understand these implications and have the ability to assess and reduce risk, detect and contain outbreaks, and monitor and minimise impacts. Here, we present a coral disease response framework that has four core components: (1) an early warning system, (2) a tiered impact assessment program, (3) scaled management actions and (4) a communication plan. The early warning system combines predictive tools that monitor the risk of outbreaks of temperature-dependent coral diseases with in situ observations provided by a network of observers who regularly report on coral health and reef state. Verified reports of an increase in disease prevalence trigger a tiered response of more detailed impact assessment, targeted research and/or management actions. The response is scaled to the risk posed by the outbreak, which is a function of the severity and spatial extent of the impacts. We review potential management actions to mitigate coral disease impacts and facilitate recovery, considering emerging strategies unique to coral disease and more established strategies to support reef resilience. We also describe approaches to communicating about coral disease outbreaks that will address common misperceptions and raise awareness of the coral disease threat. By adopting this framework, managers and researchers can establish a community of practice and can develop response plans for the management of coral disease outbreaks based on local needs. The collaborations between managers and researchers we suggest will enable adaptive management of disease impacts following evaluating the cost-effectiveness of emerging response actions and incrementally improving our understanding of outbreak causation.
DeLargy, Pamela; Alakbarov, Ramiz
2004-09-01
The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.
Climate Neutral Research Campuses | NREL
the background. Set an example for climate neutrality. Use NREL's climate action planning process and more. Climate Action Planning Process Identify the best technology options for a climate action plan . Climate Action Planning Tool Identify the best technology options for a climate action plan. Technology
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
29 CFR 1926.35 - Employee emergency action plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Employee emergency action plans. 1926.35 Section 1926.35... Provisions § 1926.35 Employee emergency action plans. (a) Scope and application. This section applies to all emergency action plans required by a particular OSHA standard. The emergency action plan shall be in writing...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-05-03
This Decision Document discusses the selection of no further action as the recommended action for nine sites located at the Barter Island radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the 14 sites located at the Barter Island installation (U.S. Air Force 1996a,b). Based on the findings of these activities, nine sites are recommended for no further action.
Eliminating mirror responses by instructions.
Bardi, Lara; Bundt, Carsten; Notebaert, Wim; Brass, Marcel
2015-09-01
The observation of an action leads to the activation of the corresponding motor plan in the observer. This phenomenon of motor resonance has an important role in social interaction, promoting imitation, learning and action understanding. However, mirror responses not always have a positive impact on our behavior. An automatic tendency to imitate others can introduce interference in action execution and non-imitative or opposite responses have an advantage in some contexts. Previous studies suggest that mirror tendencies can be suppressed after extensive practice or in complementary joint action situations revealing that mirror responses are more flexible than previously thought. The aim of the present study was to gain insight into the mechanisms that allow response flexibility of motor mirroring. Here we show that the mere instruction of a counter-imitative mapping changes mirror responses as indexed by motor evoked potentials (MEPs) enhancement induced by transcranial magnetic stimulation (TMS). Importantly, mirror activation was measured while participants were passively watching finger movements, without having the opportunity to execute the task. This result suggests that the implementation of task instructions activates stimulus-response association that can overwrite the mirror representations. Our outcome reveals one of the crucial mechanisms that might allow flexible adjustments of mirror responses in different contexts. The implications of this outcome are discussed. Copyright © 2015 Elsevier Ltd. All rights reserved.
Planning to avoid trouble in the operating room: experts' formulation of the preoperative plan.
Zilbert, Nathan R; St-Martin, Laurent; Regehr, Glenn; Gallinger, Steven; Moulton, Carol-Anne
2015-01-01
The purpose of this study was to capture the preoperative plans of expert hepato-pancreato-biliary (HPB) surgeons with the goal of finding consistent aspects of the preoperative planning process. HPB surgeons were asked to think aloud when reviewing 4 preoperative computed tomography scans of patients with distal pancreatic tumors. The imaging features they identified and the planned actions they proposed were tabulated. Surgeons viewed the tabulated list of imaging features for each case and rated the relevance of each feature for their subsequent preoperative plan. Average rater intraclass correlation coefficients were calculated for each type of data collected (imaging features detected, planned actions reported, and relevance of each feature) to establish whether the surgeons were consistent with one another in their responses. Average rater intraclass correlation coefficient values greater than 0.7 were considered indicative of consistency. Division of General Surgery, University of Toronto. HPB surgeons affiliated with the University of Toronto. A total of 11 HPB surgeons thought aloud when reviewing 4 computed tomography scans. Surgeons were consistent in the imaging features they detected but inconsistent in the planned actions they reported. Of the HPB surgeons, 8 completed the assessment of feature relevance. For 3 of the 4 cases, the surgeons were consistent in rating the relevance of specific imaging features on their preoperative plans. These results suggest that HPB surgeons are consistent in some aspects of the preoperative planning process but not others. The findings further our understanding of the preoperative planning process and will guide future research on the best ways to incorporate the teaching and evaluation of preoperative planning into surgical training. Copyright © 2014 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
Review of Antimicrobial Resistance in the Environment and Its Relevance to Environmental Regulators.
Singer, Andrew C; Shaw, Helen; Rhodes, Vicki; Hart, Alwyn
2016-01-01
The environment is increasingly being recognized for the role it might play in the global spread of clinically relevant antibiotic resistance. Environmental regulators monitor and control many of the pathways responsible for the release of resistance-driving chemicals into the environment (e.g., antimicrobials, metals, and biocides). Hence, environmental regulators should be contributing significantly to the development of global and national antimicrobial resistance (AMR) action plans. It is argued that the lack of environment-facing mitigation actions included in existing AMR action plans is likely a function of our poor fundamental understanding of many of the key issues. Here, we aim to present the problem with AMR in the environment through the lens of an environmental regulator, using the Environment Agency (England's regulator) as an example from which parallels can be drawn globally. The issues that are pertinent to environmental regulators are drawn out to answer: What are the drivers and pathways of AMR? How do these relate to the normal work, powers and duties of environmental regulators? What are the knowledge gaps that hinder the delivery of environmental protection from AMR? We offer several thought experiments for how different mitigation strategies might proceed. We conclude that: (1) AMR Action Plans do not tackle all the potentially relevant pathways and drivers of AMR in the environment; and (2) AMR Action Plans are deficient partly because the science to inform policy is lacking and this needs to be addressed.
Review of Antimicrobial Resistance in the Environment and Its Relevance to Environmental Regulators
Singer, Andrew C.; Shaw, Helen; Rhodes, Vicki; Hart, Alwyn
2016-01-01
The environment is increasingly being recognized for the role it might play in the global spread of clinically relevant antibiotic resistance. Environmental regulators monitor and control many of the pathways responsible for the release of resistance-driving chemicals into the environment (e.g., antimicrobials, metals, and biocides). Hence, environmental regulators should be contributing significantly to the development of global and national antimicrobial resistance (AMR) action plans. It is argued that the lack of environment-facing mitigation actions included in existing AMR action plans is likely a function of our poor fundamental understanding of many of the key issues. Here, we aim to present the problem with AMR in the environment through the lens of an environmental regulator, using the Environment Agency (England’s regulator) as an example from which parallels can be drawn globally. The issues that are pertinent to environmental regulators are drawn out to answer: What are the drivers and pathways of AMR? How do these relate to the normal work, powers and duties of environmental regulators? What are the knowledge gaps that hinder the delivery of environmental protection from AMR? We offer several thought experiments for how different mitigation strategies might proceed. We conclude that: (1) AMR Action Plans do not tackle all the potentially relevant pathways and drivers of AMR in the environment; and (2) AMR Action Plans are deficient partly because the science to inform policy is lacking and this needs to be addressed. PMID:27847505
Data and Tools - Alphabetical Listing | NREL
Climate Action Planning Tool Community Solar Scenario Tool Comparative PV Levelized Cost of Energy (LCOE Design Response Toolbox WEC-Sim: Wave Energy Converter Simulator West Associates Solar Monitoring Network Design and Engineering Model
Letter from EPA to All State Emergency Response Commissions
Provides information related to the implementation of the Emergency Planning and Community Right to Know Act, and the Risk Management Program under Section 112r of the Clean Air Act, and suggestions for future actions.
Survey of emergency medicine resident debt status and financial planning preparedness.
Glaspy, Jeffrey N; Ma, O John; Steele, Mark T; Hall, Jacqueline
2005-01-01
Most resident physicians accrue significant financial debt throughout their medical and graduate medical education. The objective of this study was to analyze emergency medicine resident debt status, financial planning actions, and educational experiences for financial planning and debt management. A 22-item questionnaire was sent to all 123 Accreditation Council on Graduate Medical Education-accredited emergency medicine residency programs in July 2001. Two follow-up mailings were made to increase the response rate. The survey addressed four areas of resident debt and financial planning: 1) accrued debt, 2) moonlighting activity, 3) financial planning/debt management education, and 4) financial planning actions. Descriptive statistics were used to analyze the data. Survey responses were obtained from 67.4% (1,707/2,532) of emergency medicine residents in 89 of 123 (72.4%) residency programs. Nearly one half (768/1,707) of respondents have accrued more than 100,000 dollars of debt. Fifty-eight percent (990/1,707) of all residents reported that moonlighting would be necessary to meet their financial needs, and more than 33% (640/1,707) presently moonlight to supplement their income. Nearly one half (832/1,707) of residents actively invested money, of which online trading was the most common method (23.3%). Most residents reported that they received no debt management education during residency (82.1%) or medical school (63.7%). Furthermore, 79.1% (1,351/1,707) of residents reported that they received no financial planning lectures during residency, although 84.2% (1,438/1,707) reported that debt management and financial planning education should be available during residency. Most emergency medicine residency programs do not provide their residents with financial planning education. Most residents have accrued significant debt and believe that more financial planning and debt management education is needed during residency.
Update on sideline and event preparation for management of sudden cardiac arrest in athletes.
Harmon, Kimberly G; Drezner, Jonathan A
2007-06-01
Sudden death in athletes occurs approximately once every 3 days in the United States. Each school or venue should have an emergency action plan that is coordinated with local emergency medical services (EMS). Access to early defibrillation to treat sudden cardiac arrest (SCA) is critical. If EMS response times are greater than 3 to 5 minutes from collapse to first shock, an on-site automated external defibrillator (AED) should be available. Delays in recognition of SCA in athletes occur commonly. Any collapsed and unresponsive athlete should be considered to be in cardiac arrest and an AED should be applied for rhythm analysis as soon as possible. Cardiopulmonary resuscitation should be provided while waiting for an AED and interruptions in chest compressions should be minimized. Rehearsal of the emergency action plan with potential first responders is essential to ensuring an efficient response to SCA in athletics.
ERIC Educational Resources Information Center
Tokac, Umit
2016-01-01
The dissertation explored the efficacy of using a POMDP to select and apply appropriate instruction. POMDPs are a tool for planning: selecting a sequence of actions that will lead to an optimal outcome. RTI is an approach to instruction, where teachers craft individual plans for students based on the results of screening test. The goal is to…
The Education of Homeless Children and Youth in New Jersey: A Plan for State Action.
ERIC Educational Resources Information Center
Doolan, Jay; And Others
This state plan is New Jersey's response to the charge of the Stewart B. McKinney Homeless Assistance Act of 1987 (the McKinney Act) to assure educational access for homeless children and youth. The introductory section discusses the following issues: (1) the changing face of homelessness; (2) homeless children and youth; (3) the McKinney Act; and…
Planning and executing complex large-scale exercises.
McCormick, Lisa C; Hites, Lisle; Wakelee, Jessica F; Rucks, Andrew C; Ginter, Peter M
2014-01-01
Increasingly, public health departments are designing and engaging in complex operations-based full-scale exercises to test multiple public health preparedness response functions. The Department of Homeland Security's Homeland Security Exercise and Evaluation Program (HSEEP) supplies benchmark guidelines that provide a framework for both the design and the evaluation of drills and exercises; however, the HSEEP framework does not seem to have been designed to manage the development and evaluation of multiple, operations-based, parallel exercises combined into 1 complex large-scale event. Lessons learned from the planning of the Mississippi State Department of Health Emergency Support Function--8 involvement in National Level Exercise 2011 were used to develop an expanded exercise planning model that is HSEEP compliant but accounts for increased exercise complexity and is more functional for public health. The Expanded HSEEP (E-HSEEP) model was developed through changes in the HSEEP exercise planning process in areas of Exercise Plan, Controller/Evaluator Handbook, Evaluation Plan, and After Action Report and Improvement Plan development. The E-HSEEP model was tested and refined during the planning and evaluation of Mississippi's State-level Emergency Support Function-8 exercises in 2012 and 2013. As a result of using the E-HSEEP model, Mississippi State Department of Health was able to capture strengths, lessons learned, and areas for improvement, and identify microlevel issues that may have been missed using the traditional HSEEP framework. The South Central Preparedness and Emergency Response Learning Center is working to create an Excel-based E-HSEEP tool that will allow practice partners to build a database to track corrective actions and conduct many different types of analyses and comparisons.
Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.
Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge
2015-12-01
Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.
Building Bridges for Innovation in Ageing: Synergies between Action Groups of the EIP on AHA.
Bousquet, J; Bewick, M; Cano, A; Eklund, P; Fico, G; Goswami, N; Guldemond, N A; Henderson, D; Hinkema, M J; Liotta, G; Mair, A; Molloy, W; Monaco, A; Monsonis-Paya, I; Nizinska, A; Papadopoulos, H; Pavlickova, A; Pecorelli, S; Prados-Torres, A; Roller-Wirnsberger, R E; Somekh, D; Vera-Muñoz, C; Visser, F; Farrell, J; Malva, J; Andersen Ranberg, K; Camuzat, T; Carriazo, A M; Crooks, G; Gutter, Z; Iaccarino, G; Manuel de Keenoy, E; Moda, G; Rodriguez-Mañas, L; Vontetsianos, T; Abreu, C; Alonso, J; Alonso-Bouzon, C; Ankri, J; Arredondo, M T; Avolio, F; Bedbrook, A; Białoszewski, A Z; Blain, H; Bourret, R; Cabrera-Umpierrez, M F; Catala, A; O'Caoimh, R; Cesari, M; Chavannes, N H; Correia-da-Sousa, J; Dedeu, T; Ferrando, M; Ferri, M; Fokkens, W J; Garcia-Lizana, F; Guérin, O; Hellings, P W; Haahtela, T; Illario, M; Inzerilli, M C; Lodrup Carlsen, K C; Kardas, P; Keil, T; Maggio, M; Mendez-Zorrilla, A; Menditto, E; Mercier, J; Michel, J P; Murray, R; Nogues, M; O'Byrne-Maguire, I; Pappa, D; Parent, A S; Pastorino, M; Robalo-Cordeiro, C; Samolinski, B; Siciliano, P; Teixeira, A M; Tsartara, S I; Valiulis, A; Vandenplas, O; Vasankari, T; Vellas, B; Vollenbroek-Hutten, M; Wickman, M; Yorgancioglu, A; Zuberbier, T; Barbagallo, M; Canonica, G W; Klimek, L; Maggi, S; Aberer, W; Akdis, C; Adcock, I M; Agache, I; Albera, C; Alonso-Trujillo, F; Angel Guarcia, M; Annesi-Maesano, I; Apostolo, J; Arshad, S H; Attalin, V; Avignon, A; Bachert, C; Baroni, I; Bel, E; Benson, M; Bescos, C; Blasi, F; Barbara, C; Bergmann, K C; Bernard, P L; Bonini, S; Bousquet, P J; Branchini, B; Brightling, C E; Bruguière, V; Bunu, C; Bush, A; Caimmi, D P; Calderon, M A; Canovas, G; Cardona, V; Carlsen, K H; Cesario, A; Chkhartishvili, E; Chiron, R; Chivato, T; Chung, K F; d'Angelantonio, M; De Carlo, G; Cholley, D; Chorin, F; Combe, B; Compas, B; Costa, D J; Costa, E; Coste, O; Coupet, A-L; Crepaldi, G; Custovic, A; Dahl, R; Dahlen, S E; Demoly, P; Devillier, P; Didier, A; Dinh-Xuan, A T; Djukanovic, R; Dokic, D; Du Toit, G; Dubakiene, R; Dupeyron, A; Emuzyte, R; Fiocchi, A; Wagner, A; Fletcher, M; Fonseca, J; Fougère, B; Gamkrelidze, A; Garces, G; Garcia-Aymeric, J; Garcia-Zapirain, B; Gemicioğlu, B; Gouder, C; Hellquist-Dahl, B; Hermosilla-Gimeno, I; Héve, D; Holland, C; Humbert, M; Hyland, M; Johnston, S L; Just, J; Jutel, M; Kaidashev, I P; Khaitov, M; Kalayci, O; Kalyoncu, A F; Keijser, W; Kerstjens, H; Knezović, J; Kowalski, M; Koppelman, G H; Kotska, T; Kovac, M; Kull, I; Kuna, P; Kvedariene, V; Lepore, V; MacNee, W; Maggio, M; Magnan, A; Majer, I; Manning, P; Marcucci, M; Marti, T; Masoli, M; Melen, E; Miculinic, N; Mihaltan, F; Milenkovic, B; Millot-Keurinck, J; Mlinarić, H; Momas, I; Montefort, S; Morais-Almeida, M; Moreno-Casbas, T; Mösges, R; Mullol, J; Nadif, R; Nalin, M; Navarro-Pardo, E; Nekam, K; Ninot, G; Paccard, D; Pais, S; Palummeri, E; Panzner, P; Papadopoulos, N K; Papanikolaou, C; Passalacqua, G; Pastor, E; Perrot, M; Plavec, D; Popov, T A; Postma, D S; Price, D; Raffort, N; Reuzeau, J C; Robine, J M; Rodenas, F; Robusto, F; Roche, N; Romano, A; Romano, V; Rosado-Pinto, J; Roubille, F; Ruiz, F; Ryan, D; Salcedo, T; Schmid-Grendelmeier, P; Schulz, H; Schunemann, H J; Serrano, E; Sheikh, A; Shields, M; Siafakas, N; Scichilone, N; Siciliano, P; Skrindo, I; Smit, H A; Sourdet, S; Sousa-Costa, E; Spranger, O; Sooronbaev, T; Sruk, V; Sterk, P J; Todo-Bom, A; Touchon, J; Tramontano, D; Triggiani, M; Tsartara, S I; Valero, A L; Valovirta, E; van Ganse, E; van Hage, M; van den Berge, M; Vandenplas, O; Ventura, M T; Vergara, I; Vezzani, G; Vidal, D; Viegi, G; Wagemann, M; Whalley, B; Wickman, M; Wilson, N; Yiallouros, P K; Žagar, M; Zaidi, A; Zidarn, M; Hoogerwerf, E J; Usero, J; Zuffada, R; Senn, A; de Oliveira-Alves, B
2017-01-01
The Strategic Implementation Plan of the European Innovation Partnership on Active and Healthy Ageing (EIP on AHA) proposed six Action Groups. After almost three years of activity, many achievements have been obtained through commitments or collaborative work of the Action Groups. However, they have often worked in silos and, consequently, synergies between Action Groups have been proposed to strengthen the triple win of the EIP on AHA. The paper presents the methodology and current status of the Task Force on EIP on AHA synergies. Synergies are in line with the Action Groups' new Renovated Action Plan (2016-2018) to ensure that their future objectives are coherent and fully connected. The outcomes and impact of synergies are using the Monitoring and Assessment Framework for the EIP on AHA (MAFEIP). Eight proposals for synergies have been approved by the Task Force: Five cross-cutting synergies which can be used for all current and future synergies as they consider overarching domains (appropriate polypharmacy, citizen empowerment, teaching and coaching on AHA, deployment of synergies to EU regions, Responsible Research and Innovation), and three cross-cutting synergies focussing on current Action Group activities (falls, frailty, integrated care and chronic respiratory diseases).
Metzger, Lia; Ahalt, Cyrus; Kushel, Margot; Riker, Alissa; Williams, Brie
2017-09-11
Purpose The rapidly increasing number of older adults cycling through local criminal justice systems (jails, probation, and parole) suggests a need for greater collaboration among a diverse group of local stakeholders including professionals from healthcare delivery, public health, and criminal justice and directly affected individuals, their families, and advocates. The purpose of this paper is to develop a framework that local communities can use to understand and begin to address the needs of criminal justice-involved older adults. Design/methodology/approach The framework included solicit input from community stakeholders to identify pressing challenges facing criminal justice-involved older adults, conduct needs assessments of criminal justice-involved older adults and professionals working with them; implement quick-response interventions based on needs assessments; share findings with community stakeholders and generate public feedback; engage interdisciplinary group to develop an action plan to optimize services. Findings A five-step framework for creating an interdisciplinary community response is an effective approach to action planning and broad stakeholder engagement on behalf of older adults cycling through the criminal justice system. Originality/value This study proposes the Criminal Justice Involved Older Adults in Need of Treatment Initiative Framework for establishing an interdisciplinary community response to the growing population of medically and socially vulnerable criminal justice-involved older adults.
RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Annette L. Schafer
2012-06-01
A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
... conciliation or settlement agreements. 1608.6 Section 1608.6 Labor Regulations Relating to Labor (Continued... settlement agreement executed under title VII and approved by a responsible official of the EEOC is the basis... settlement agreement was approved by a responsible official of the EEOC, and (2) Whether adherence to the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... conciliation or settlement agreements. 1608.6 Section 1608.6 Labor Regulations Relating to Labor (Continued... settlement agreement executed under title VII and approved by a responsible official of the EEOC is the basis... settlement agreement was approved by a responsible official of the EEOC, and (2) Whether adherence to the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... conciliation or settlement agreements. 1608.6 Section 1608.6 Labor Regulations Relating to Labor (Continued... settlement agreement executed under title VII and approved by a responsible official of the EEOC is the basis... settlement agreement was approved by a responsible official of the EEOC, and (2) Whether adherence to the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... conciliation or settlement agreements. 1608.6 Section 1608.6 Labor Regulations Relating to Labor (Continued... settlement agreement executed under title VII and approved by a responsible official of the EEOC is the basis... settlement agreement was approved by a responsible official of the EEOC, and (2) Whether adherence to the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... conciliation or settlement agreements. 1608.6 Section 1608.6 Labor Regulations Relating to Labor (Continued... settlement agreement executed under title VII and approved by a responsible official of the EEOC is the basis... settlement agreement was approved by a responsible official of the EEOC, and (2) Whether adherence to the...
33 CFR 155.1035 - Response plan requirements for manned vessels carrying oil as a primary cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... coordinator responsible for overseeing or directing those actions. (4) The organizational structure that will... organizational structure identified in paragraph (d)(4) of this section. (e) List of contacts. The name, location..., in order of priority to be made by shipboard or shore-based personnel and the information required...
75 FR 60759 - Enforcement Action Plan for Promotion and Advertising Restrictions; Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-01
...] Enforcement Action Plan for Promotion and Advertising Restrictions; Availability AGENCY: Food and Drug... availability of a document entitled ``Enforcement Action Plan for Promotion and Advertising Restrictions'' (Enforcement Action Plan), which describes FDA's plan to enforce the restrictions on promotion and advertising...
Development and demonstration of an on-board mission planner for helicopters
NASA Technical Reports Server (NTRS)
Deutsch, Owen L.; Desai, Mukund
1988-01-01
Mission management tasks can be distributed within a planning hierarchy, where each level of the hierarchy addresses a scope of action, and associated time scale or planning horizon, and requirements for plan generation response time. The current work is focused on the far-field planning subproblem, with a scope and planning horizon encompassing the entire mission and with a response time required to be about two minutes. The far-feld planning problem is posed as a constrained optimization problem and algorithms and structural organizations are proposed for the solution. Algorithms are implemented in a developmental environment, and performance is assessed with respect to optimality and feasibility for the intended application and in comparison with alternative algorithms. This is done for the three major components of far-field planning: goal planning, waypoint path planning, and timeline management. It appears feasible to meet performance requirements on a 10 Mips flyable processor (dedicated to far-field planning) using a heuristically-guided simulated annealing technique for the goal planner, a modified A* search for the waypoint path planner, and a speed scheduling technique developed for this project.
Urbanism, climate change and health: systems approaches to governance.
Capon, Anthony G; Synnott, Emma S; Holliday, Sue
2009-01-01
Effective action on climate change health impacts and vulnerability will require systems approaches and integrated policy and planning responses from a range of government agencies. Similar responses are needed to address other complex problems, such as the obesity epidemic. Local government, with its focus on the governance of place, will have a key role in responding to these convergent agendas. Industry can also be part of the solution - indeed it must be, because it has a lead role in relevant sectors. Understanding the co-benefits for health of climate mitigation actions will strengthen the case for early action. There is a need for improved decision support tools to inform urban governance. These tools should be based on a systems approach and should incorporate a spatial perspective.
NASA Technical Reports Server (NTRS)
Wang, Charles C.; Peng, Ted; Sue, Miles K.
2004-01-01
In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.
Theater Combat Search and Rescue
1993-05-06
response to crises requiring the use of military forces. Theater CINCs receive mission taskings through a warning order transmitted from 5 0 the Joint...Chiefs of Staff. This warning order allocates specific military forces that CINCs may use when planning various courses of action. The CINCs complete and...consists of the President and the 5 Secretary of Defense, and is the only approving authority to order execution of a military action. 10 Deliberate
TEMA-DOE annual report, July 1, 1997--June 30, 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-09-01
The Tennessee Emergency Management Agency (TEMA) will develop off-site Multi-Jurisdictional Emergency Response Plans (MJERPs) in coordination with Federal, State, and local agencies. The MJERPs will describe actions to minimize the risks to the citizens of Tennessee as a result of an off-site release of hazardous material from the DOE Oak Ridge Reservation. This report describes actions made during each quarter of the year.
Brain mechanisms of perceiving tools and imagining tool use acts: a functional MRI study.
Wadsworth, Heather M; Kana, Rajesh K
2011-06-01
The ability to conceptualize and manipulate tools in a complex manner is a distinguishing characteristic of humans, and forms a promising milestone in human evolution. While using tools is a motor act, proposals for executing such acts may be evoked by the mere perception of a tool. Imagining an action using a tool may invoke mental readjustment of body posture, planning motor movements, and matching such plans with the model action. This fMRI study examined the brain response in 32 healthy adults when they either viewed a tool or imagined using it. While both viewing and imagining tasks recruited similar regions, imagined tool use showed greater activation in motor areas, and in areas around the bilateral temporoparietal junction. Viewing tools, on the other hand, produced robust activation in the inferior frontal, occipital, parietal, and ventral temporal areas. Analysis of gender differences indicated males recruiting medial prefrontal and anterior cingulate cortices and females, left supramarginal gyrus and left anterior insula. While tool viewing seems to generate prehensions about using them, the imagined action using a tool mirrored brain responses underlying functional use of it. The findings of this study may suggest that perception and imagination of tools may form precursors to overt actions. Published by Elsevier Ltd.
Ahead with Cairo. Monitoring country activities.
Danguilan, M; Wainer, J; Widyantoro, N; Capoor, I; Huq, N; Ashino, Y; Sadasivam, B; Le Thi Nham Tuyet
1995-04-01
In the aftermath of the 1994 UN Conference on Population and Development (ICPD) in Cairo, countries are proceeding with their implementation of the plan of action adopted at the conference. A brief description is given of some actions taken by specific countries toward plan implementation. In the Philippines meetings were held immediately after the conference in October on the implications for the Management, Family Planning, and Nongovernmental Organizations programs. The issues of concern were identified as the need for regular consultative meetings among relevant agencies, consultations with women's groups, and a responsive adolescents program. In Australia the program thrust was to focus on the implications for immigration. Monitoring of the plans of action will be undertaken by nongovernmental organizations (NGOs). In Malaysia committees are preparing a program of action suitable for implementation in Malaysia. A regional women's NGO organized a forum on the implications of ICPD for women's reproductive health, women's rights, and empowerment in Malaysia. In Vietnam, press conferences are used to communicate conference results. An NGO translated relevant ICPD materials into Vietnamese. In Indonesia, several ministries convened meetings among donors, NGOs, women's groups, and experts. In India, the government held a national conference. One view was that population issues should be discussed in the context of gender equality and empowerment of women. Another issue was the importance of placing reproductive health in the larger context of health and primary health services. Health personnel at all levels were considered in need of sensitization on gender issues. Problems such as anemia have not been successfully addressed in existing programs. The government agreed to remove in phases target driven programs and the sterilization emphasis. In Bangladesh, a national committee was formed, and NGOs are actively distributing information. In Japan, the Family Planning Federation in a collaborative effort is actively promoting concrete actions.
39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?
Code of Federal Regulations, 2013 CFR
2013-07-01
... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...
39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?
Code of Federal Regulations, 2012 CFR
2012-07-01
... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...
39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?
Code of Federal Regulations, 2014 CFR
2014-07-01
... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...
39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?
Code of Federal Regulations, 2011 CFR
2011-07-01
... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...
39 CFR 778.4 - What are the Postal Service's general responsibilities under the Order?
Code of Federal Regulations, 2010 CFR
2010-07-01
... coordinate proposed direct Federal development projects, the Postal Service, to the extent permitted by law...) Communicates with state and local elected officials as early in a facility project action's planning cycle as...
Erasing our National Debt Through Accountability and Responsibility Plan Act of 2010
Sen. Thune, John [R-SD
2010-01-20
Senate - 01/20/2010 Read twice and referred to the Committee on Banking, Housing, and Urban Affairs. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Compendium of Unimplemented Recommendations: Oct 1, 2013 - Mar 31, 2014
Compendium #14-N-0242, April 30, 2014. As part of the OIG’s results-oriented culture, we perform follow-up assessments to determine whether planned actions by the EPA in response to OIG recommendations were taken.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griff, M.T.
This paper provides an overview of recent initiatives of the United States which promote greater use of natural gas and unconventional gas as one part of this nations`s larger response to the global warming threat. Measurable increases in greenhouse gas concentrations since the beginning of the industrial revolution have led to the belief in the existence of a global warming problem. The international community has responded to the global warming threat with the United Nations Framework Convention on Climate Change which is directed toward the stabilization of greenhouse gases in the atmosphere. The Climate Change Action Plan is the Clintonmore » Administration`s detailed response to the global warming threat. It is designed to return United States emissions of greenhouse gases to their 1990 levels by the year 2000. The Action Plan targets all greenhouse gases and emphasizes energy efficiency. Significant regulatory reformation designed to increase the efficiency of the natural gas industry has already occurred and will be continued. Recovery of methane emissions from landfills will be encouraged through indentification of suitable sites and use of existing technology and development of new technology. Recovery of methane from coal mining operations will be promoted by targeting 50 of the gassiest mines in the United States. Even if the Action Plan is fully implemented. legitimate questions arise as to whether its goals will be achieved as a result of funding shortfalls.« less
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... action plan must include at a minimum: (1) Procedures for reporting a fire or other emergency; (2... 29 Labor 5 2013-07-01 2013-07-01 false Emergency action plans. 1910.38 Section 1910.38 Labor... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Exit Routes and Emergency Planning § 1910.38 Emergency action plans...
NASA Astrophysics Data System (ADS)
Fischbach, J. R.; Johnson, D.
2017-12-01
Louisiana's Comprehensive Master Plan for a Sustainable Coast is a 50-year plan designed to reduce flood risk and minimize land loss while allowing for the continued provision of economic and ecosystem services from this critical coastal region. Conceived in 2007 in response to hurricanes Katrina and Rita in 2005, the master plan is updated on a five-year planning cycle by the state's Coastal Protection and Restoration Authority (CPRA). Under the plan's middle-of-the-road (Medium) environmental scenario, the master plan is projected to reduce expected annual damage from storm surge flooding by approximately 65% relative to a future without action: from 5.3 billion to 2.2 billion in 2040, and from 12.1 billion to 3.7 billion in 2065. The Coastal Louisiana Risk Assessment model (CLARA) is used to estimate the risk reduction impacts of projects that have been considered for implementation as part of the plan. Evaluation of projects involves estimation of cost effectiveness in multiple future time periods and under a range of environmental uncertainties (e.g., the rates of sea level rise and land subsidence, changes in future hurricane intensity and frequency), operational uncertainties (e.g., system fragility), and economic uncertainties (e.g., patterns of population change and asset exposure). Between the 2012 and 2017 planning cycles, many improvements were made to the CLARA model. These included changes to the model's spatial resolution and definition of policy-relevant spatial units, an improved treatment of parametric uncertainty and uncertainty propagation between model components, the addition of a module to consider critical infrastructure exposure, and a new population growth model. CPRA also developed new scenarios for analysis in 2017 that were responsive to new scientific literature and to accommodate a new approach to modeling coastal morphology. In this talk, we discuss how CLARA has evolved over the 2012 and 2017 planning cycles in response to the needs of policy makers and CPRA managers. While changes will be illustrated through examples from Louisiana's 2017 Coastal Master Plan, we endeavor to provide generalizable and actionable insights about how modeling choices should be guided by the decision support process being used by planners.
NASA Technical Reports Server (NTRS)
Woodward, Hugh
2005-01-01
Remote meetings are best for updates and information sharing, but it is possible to effectively facilitate decisions with a little planning. Generally, the meeting leader needs to clearly state the proposed decision and then separately poll each participant for concurrence. Normally, there will be a range of responses, requiring the facilitator to restate the proposal and repeat the process. Several iterations may be required before a consensus is achieved. I usually confirm decisions by restating the conclusion as it will appear in the meeting notes and asking the participants to express any objections. Gaining commitment to follow-up actions is never easy, of course, but tends to be particularly tricky in remote meetings. The ideal solution is to use collaboration software with a whiteboard as a means of recording the follow-up actions and responsibilities. (A Word or Excel document viewed through NetMeeting works equally well.) But if the meeting is being conducted without collaboration software, the leader must review each follow-up action explicitly, even painstakingly. I generally note follow-up actions throughout the meeting and use the last few minutes to confirm and finalize. I read each action and name the person I think owns the responsibility. When the person accepts, I validate by asking for a completion date. All the normal rules for assigning follow-up actions apply, of course. One, and only one, person must be responsible for each action, and assigning an action to somebody not present is akin to assigning it to nobody.
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
2014-05-01
There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false State highway-rail grade crossing action plans..., STATE ACTION PLANS, AND EMERGENCY NOTIFICATION SYSTEMS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway...
48 CFR 909.504 - Contracting officer's responsibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... such firms for interests relating to a potential organizational conflict of interest in the performance... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 909.504... potential organizational conflict of interest and identify any actions that may be taken to avoid...
48 CFR 909.504 - Contracting officer's responsibility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... such firms for interests relating to a potential organizational conflict of interest in the performance... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 909.504... potential organizational conflict of interest and identify any actions that may be taken to avoid...
ERIC Educational Resources Information Center
National Governors' Association, Washington, DC.
This document presents briefing papers for the seven gubernatorial task forces proposed in the National Governors' Association Action Plan for Attaining Educational Excellence. An introductory section discusses the complementary responsibilities of Federal, State, and local governments for assuring access to educational opportunities for all…
STABILIZATION/SOLIDIFICATION OF CERCLA AND RCRA WASTES
This Handbook provides U.S. EPA regional staff responsible for reviewing CERCLA remedial action plans and RCRA permit applications with a tool for interpreting information on stabilization/solidification treatment. As a practical day-to-day reference guide, it will also provide t...
LEPCs set goals and determine if their actions continue to achieve desired outcomes. Based on Guidance on Developing Safety Performance Indicators related to Chemical Accident Prevention, Preparedness and Response for Public Authorities and Communities.
Pitfalls and opportunities for environmental marketers.
Gillespie, R J
1992-01-01
Issues such as global warming, ozone depletion, insufficient landfill capacity, and excess packaging are foremost on the minds of consumers. Companies face a myriad of environmental challenges, but they also recognize the opportunities to be gained by implementing responsible marketing action plans.
49 CFR 234.105 - Activation failure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Activation failure. 234.105 Section 234.105 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports...
49 CFR 234.101 - Employee notification rules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Employee notification rules. 234.101 Section 234.101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response...
49 CFR 234.107 - False activation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false False activation. 234.107 Section 234.107 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports...
49 CFR 234.106 - Partial activation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Partial activation. 234.106 Section 234.106 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports...
49 CFR 234.101 - Employee notification rules.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Employee notification rules. 234.101 Section 234.101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response...
49 CFR 234.106 - Partial activation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Partial activation. 234.106 Section 234.106 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports...
49 CFR 234.105 - Activation failure.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Activation failure. 234.105 Section 234.105 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports...
49 CFR 234.107 - False activation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false False activation. 234.107 Section 234.107 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION GRADE CROSSING SIGNAL SYSTEM SAFETY AND STATE ACTION PLANS Response to Reports...
NASA Astrophysics Data System (ADS)
Janichewski, S.; Ben Aı̈m, H.
2004-04-01
CNES's latest strategic plan defines the French space agency's strategic focus and charts its course for the 2001-2005 timeframe. Based on a vision of how the space sector will evolve over the period up to 2010, the Strategic Plan sets out the agency's ambition for 2005: " CNES—space technology serving society". This ambition is structured around four challenges: Focusing actions on society's needs in three areas where space technology can make a major difference—environment, science and the information society and mobility. Building the foundation for success by ensuring competitive access to space and boosting basic research and technological innovation. Strengthening national and European synergies to ensure complementarity between: the ESA European framework, which is well adapted for major projects and the development of a European Space Strategy (ESS); and the national framework to support activities of national responsibility such as defence, science and technology development, and to improve competitiveness through direct international cooperation with other space agencies. Forging effective partnerships with its research and industry partners in Europe and France to enhance performance by: developing a service culture; building partnerships; concentrating on core competencies where it can most add value; improving skills and responsiveness in line with its strategic position; ensuring transparent and rigorous management of public funds. This Strategic Plan will be implemented in the 2001-2005 timeframe at all management levels. Implementation will be eased by the fact that the plan has been drawn up through a specific process designed to make internal management aware of the analysis underlying it. This will ensure that all stakeholders understand and appropriate the plan's orientations and thus play an active role in CNES' development. This process involved five successive steps: shared assessment of the space sector's evolution, providing a common baseline from which to build on CNES's vision; shared ambition, defining the agency's objectives and strategic focus; applying lines of action at each of the agency's four space centres through specifically targeted action plans at centre and process level; setting up of a monitoring and oversight structure; definition of a communication strategy to support management of change, designed to keep all CNES personnel informed about the plan and the process behind it.
Social Science for Counterterrorism: Putting the Pieces Together
2009-01-01
Term Communications In countering terrorism or insurgency, short-term communications efforts—such as crisis response or rapid message adaptation in...of time. Within the literature on crisis communications is a generally agreed- on list of preparatory actions an organization should take, including...writing a crisis response plan, assigning crisis spokespersons and teams, training staff for crises, identifying communications risks and vulner
29 CFR 1608.7 - Affirmative action plans or programs under State or local law.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action plans...
29 CFR 1608.7 - Affirmative action plans or programs under State or local law.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Affirmative action plans or programs under State or local... OPPORTUNITY COMMISSION AFFIRMATIVE ACTION APPROPRIATE UNDER TITLE VII OF THE CIVIL RIGHTS ACT OF 1964, AS AMENDED § 1608.7 Affirmative action plans or programs under State or local law. Affirmative action plans...
Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jannik, G.T.; Mamatey, A.; Arnett, M.
1993-10-05
In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue tomore » analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.« less
Anticipation and response: pandemic influenza in Malawi, 2009
Sambala, Evanson Z.; Manderson, Lenore
2017-01-01
ABSTRACT Background: In 2006, Malawi developed a national influenza plan to mitigate, prevent and manage the burden of infection should an outbreak occur. In 2009, it translated its contingency plan to respond to the unfolding influenza pandemic. However, little is known of how Malawi translated its national influenza plan into response actions, or the success of these responses. Objective: To investigate how Malawi translated its preparedness plan and so broaden our understanding of the outcomes of the responses. Methods: We draw on data from 22 in-depth interviews with government policymakers and people working at a policy level in various non-governmental organisations, conducted to assess the level of preparedness and the challenges of translating this. Results: Through a number of public health initiatives, authorities developed communication strategies, strengthened influenza surveillance activities and updated overall goals in pandemic training and education. However, without influenza drills, exercises and simulations to test the plan, activating the pandemic plan, including coordinating and deploying generic infection control measures, was problematic. Responses during the pandemic were at times ‘weak and clumsy’ and failed to mirror the activities and processes highlighted in the preparedness plan. Conclusions: Participants stressed that in order to achieve a coordinated and successful response to mitigate and prevent the further transmission of pandemic influenza, good preparation was critical. The key elements which they identified as relevant for a rapid response included effective communications, robust evidence-based decision-making, strong and reliable surveillance systems and flexible public health responses. To effectively articulate a viable trajectory of pandemic responses, the potential value of simulation exercises could be given more consideration as a mean of sustaining good levels of preparedness and responses against future pandemics. These all demand a well-structured planning for and response to pandemic influenza strategy developed by a functioning scientific and policy advisory committee. PMID:28753109
Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.
1988-02-01
In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less
Meris, Ronald G; Barbera, Joseph A
2014-01-01
In a large-scale outdoor, airborne, hazardous materials (HAZMAT) incident, such as ruptured chlorine rail cars during a train derailment, the local Incident Commanders and HAZMAT emergency responders must obtain accurate information quickly to assess the situation and act promptly and appropriately. HAZMAT responders must have a clear understanding of key information and how to integrate it into timely and effective decisions for action planning. This study examined the use of HAZMAT plume modeling as a decision support tool during incident action planning in this type of extreme HAZMAT incident. The concept of situation awareness as presented by Endsley's dynamic situation awareness model contains three levels: perception, comprehension, and projection. It was used to examine the actions of incident managers related to adequate data acquisition, current situational understanding, and accurate situation projection. Scientists and engineers have created software to simulate and predict HAZMAT plume behavior, the projected hazard impact areas, and the associated health effects. Incorporating the use of HAZMAT plume projection modeling into an incident action plan may be a complex process. The present analysis used a mixed qualitative and quantitative methodological approach and examined the use and limitations of a "HAZMAT Plume Modeling Cycle" process that can be integrated into the incident action planning cycle. HAZMAT response experts were interviewed using a computer-based simulation. One of the research conclusions indicated the "HAZMAT Plume Modeling Cycle" is a critical function so that an individual/team can be tasked with continually updating the hazard plume model with evolving data, promoting more accurate situation awareness.
Multisite Assessment of Nursing Continuing Education Learning Needs Using an Electronic Tool.
Winslow, Susan; Jackson, Stephanie; Cook, Lesley; Reed, Joanne Williams; Blakeney, Keshia; Zimbro, Kathie; Parker, Cindy
2016-02-01
A continued education needs assessment and associated education plan are required for organizations on the journey for American Nurses Credentialing Center Magnet® designation. Leveraging technology to support the assessment and analysis of continuing education needs was a new venture for a 12-hospital regional health system. The purpose of this performance improvement project was to design and conduct an enhanced process to increase the efficiency and effectiveness of gathering data on nurses' preferences and increase nurse satisfaction with the learner assessment portion of the process. Educators trialed the use of a standardized approach via an electronic survey tool to replace the highly variable processes previously used. Educators were able to view graphical summary of responses by category and setting, which substantially decreased analysis and action planning time for education implementation plans at the system, site, or setting level. Based on these findings, specific continuing education action plans were drafted for each category and classification of nurses. Copyright 2016, SLACK Incorporated.
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Legislative Framework for Landscape Planning in Latvia
NASA Astrophysics Data System (ADS)
Nitavska, Natalija; Zigmunde, Daiga
2017-10-01
With the adoption and the ratification of the European Landscape Convention a legally justified need for a clear landscape policy was grounded in the European countries. It includes the elaboration of the new and the improvement of the existing legislative documents on landscape planning, protection and management. The aim of the particular study is to analyse the existing legislative documents in Latvia influencing landscape planning on different scales / and the implementation of the European Landscape Convention. The study emphasizes the complex structure of the Latvian legislative framework affected by the distribution of the normative documents under the various ministries. Therefore, the main problem is unclear responsibility levels and organizational system for solving the issues regarding landscape planning, protection and management. Thus the various discussions between the involved disciplines and responsible institutions are arising. Two groups of the legislative documents influencing the implementation of the landscape policy in Latvia are detected within the study. The first group is strategic documents determining main landscape planning principles and directions at European, national, regional and professional or sectoral level. The second group is operational documents providing a set of actions for the landscape planning, protection and management at the local or the municipality level. The study concludes that operational documents developed by the municipalities are in high importance because of their direct influence on the landscape planning in Latvia. This often leads to the different landscape planning requirements included in the normative documents of the neighbouring municipalities, although the spatial and ecological borders of the visual landscape do not fit with the formal borders of the municipalities. Thus, it is essential to develop the common principles and actions that would be incumbent on all municipalities to provide the landscape integrity and to protect its values according to the main principles defined in the European Landscape Convention.
1989-02-01
PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only
2000-07-16
Specifically, the management of the acute situation will set the tone for societal responses. The accurate portrayal of ongoing efforts and successful...their comments and actions. Specifically, the management of the acute situation will set the tone for societal responses. The accurate portrayal of...casualties. In the acute phase, anxiolytics may help acutely anxious individuals who do not respond to reassurance and education. In the chronic phase
Experiences of an Engineer working in Reactor Safety and Emergency Response
NASA Astrophysics Data System (ADS)
Osborn, Douglas
2015-04-01
The U.S. Department of Energy's Federal Radiological Monitoring and Assessment Center Consequence Management Home Team (FRMAC/CMHT) Assessment Scientist's roles, responsibilities incorporate the FRMAC with other federal, state, and local agencies during a nuclear/radiological emergency. Before the Consequence Management Response Team arrives on-site, the FRMAC/CMHT provides technical and logistical support to the FRMAC and to state, local, and tribal authorities following a nuclear/radiological event. The FRMAC/CMHT support includes analyzing event data, evaluating hazards that relate to protection of the public, and providing event information and data products to protective action decision makers. The Assessment Scientist is the primary scientist responsible for performing calculations and analyses and communicating results to the field during any activation of the FRMAC/CMHT assets. As such, the FRMAC/CMHT Assessment Scientist has a number of different roles and responsibilities to fill depending upon the type of response that is required. Additionally, the Sandia National Laboratories (SNL) Consequence Assessment Team (CAT) Consequence Assessor roles, responsibilities involve hazardous materials operational emergency at SNL New Mexico facilities (SNL/NM) which include loss of control over radioactive, chemical, or explosive hazardous materials. When a hazardous materials operational emergency occurs, key decisions must be made in order to regain control over the hazards, protect personnel from the effects of the hazards, and mitigate impacts on operations, facilities, property, and the environment. Many of these decisions depend in whole or in part on the evaluation of potential consequences from a loss of control over the hazards. As such, the CAT has a number of different roles and responsibilities to fill depending upon the type of response that is required. Primary consequence-based decisions supported by the CAT during a hazardous materials operational emergency at SNL/NM include: (1) Onsite Protective Actions (2) Offsite Protective Action Recommendations (3) Event categorization (4) Event classification Other consequence-based decisions supported by the CAT include: (1) Response planning and operations (2) Event termination (3) Reentry planning and operations (4) Recovery planning and operations Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration.
Hartwigsen, Gesa; Bestmann, Sven; Ward, Nick S.; Woerbel, Saskia; Mastroeni, Claudia; Granert, Oliver; Siebner, Hartwig R.
2013-01-01
The ability to discard a prepared action plan in favor of an alternative action is critical when facing sudden environmental changes. We tested whether the functional contribution of left supramarginal gyrus (SMG) during action reprogramming depends on the functional integrity of left dorsal premotor cortex (PMd). Adopting a dual-site repetitive transcranial magnetic stimulation (rTMS) strategy, we first transiently disrupted PMd with “offline” 1Hz rTMS and then applied focal “online” rTMS to SMG whilst human subjects performed a spatially-precued reaction time task. Effective online rTMS of SMG but not sham rTMS of SMG increased errors when subjects had to reprogram their action in response to an invalid precue regardless of the type of preceding offline rTMS. This suggests that left SMG primarily contributes to the online updating of actions by suppressing invalidly prepared responses. Online rTMS of SMG additionally increased reaction times for correct responses in invalidly-precued trials, but only after offline rTMS of PMd. We infer that offline rTMS caused an additional dysfunction of PMd which increased the functional relevance of SMG for rapid activation of the correct response, and sensitized SMG to the disruptive effects of online rTMS. These results not only provide causal evidence that left PMd and SMG jointly contribute to action reprogramming, but also that the respective functional weight of these areas can be rapidly redistributed. This mechanism might constitute a generic feature of functional networks that allows for rapid functional compensation in response to focal dysfunctions. PMID:23152600
Djandji, Fabienne; Lamontagne, Alexandrine J; Blais, Lucie; Bacon, Simon L; Ernst, Pierre; Grad, Roland; Lavoie, Kim L; McKinney, Martha L; Desplats, Eve; Ducharme, Francine M
2017-03-31
Despite national recommendations, most patients with asthma are not given a written action plan . The objectives were to ascertain physicians' endorsement of potential enablers to providing a written action plan, and the determinants and proportion, of physician-reported use of a written action plan. We surveyed 838 family physicians, paediatricians, and emergency physicians in Quebec. The mailed questionnaire comprised 102 questions on asthma management, 11 of which pertained to written action plan and promising enablers. Physicians also selected a case vignette that best corresponded to their practice and reported their management. The survey was completed by 421 (56%) physicians (250 family physicians, 115 paediatricians and 56 emergency physicians); 43 (5.2%) reported providing a written action plan to ≥70% of their asthmatic patients and 126 (30%) would have used a written action plan in the selected vignette. Most (>60%) physicians highly endorsed the following enablers: patients requesting a written action plan, adding a blank written action plan to the chart, receiving a copy of the written action plan completed by a consultant, receiving a monetary compensation for its completion, and having another healthcare professional explain the completed written action plan to patients. Four determinants were significantly associated with providing a written action plan: being a paediatrician (RR:2.1), treating a child (RR:2.0), aiming for long-term asthma control (RR:2.5), and being aware of national recommendations to provide a written action plan to asthmatic patients (RR:2.9). A small minority of Quebec physicians reported providing a written action plan to most of their patients, revealing a huge care gap. Several enablers to improve uptake, highly endorsed by physicians, should be prioritised in future implementation efforts. ENCOURAGING DOCTORS TO PROVIDE WRITTEN ACTION PLANS: Changes to practice organization and doctors' perceptions should encourage the provision of written action plans for all asthma patients. International guidelines state that effective long-term treatment of asthma requires educated self-management, regular reviews and provision of a written action plan (WAP). However, many patients have poor asthma control and as few as 30 per cent have a WAP. Fabienne Djandji at the Saint-Justine University Central Hospital in Montreal, Canada, and co-workers conducted a survey of 421 doctors to determine their attitudes and provision of WAPs. Only 5.2 per cent of respondents provided WAPs to patients; those treating children or aiming for long-term asthma control were more likely to do so. The doctors said that incentives to provide WAPs would include requests from patients themselves, being paid to complete WAPs and having extra support from specialists or other health care professionals such as pharmacists.
ERIC Educational Resources Information Center
Reamer, Frederic G.
1992-01-01
Discusses concept of the impaired professional; reviews research on various types of impairment (personality disorders, depression and other emotional problems, marital problems, and physical illness), prevalence and causes of impairment, and responses to it; and outlines model assessment and action plan for social workers who encounter an…
32 CFR 644.519 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ESTATE HANDBOOK Disposal Clearance of Explosive Hazards and Other Contamination from Proposed Excess Land... contamination on all and/or buildings where an excessing action is planned. USATHAMA will conduct the survey and... property. Clearance statements which identify contaminations of ammunition and explosives will be submitted...
Accident casualty reporting and recording by DOT modal agencies : a background paper
DOT National Transportation Integrated Search
2001-06-30
This report was prepared in support of the Safety Data Action Plan (SDAP) sponsored by the Bureau of Transportation Statistics (BTS). This document supports the working group responsible for SDAP research project #2 - Develop Common Criteria for Repo...
10 Steps for Implementing Change.
ERIC Educational Resources Information Center
Marsee, Jeff
2002-01-01
Offers steps for adapting the change process to institutional culture: align leadership style with organizational culture, don't overuse change missionaries, protect change agents, define the problem, maintain focus when the project drifts, identify and remove barriers before implementing action plans, assign responsibilities to individuals,…
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An... plans. An emergency action plan must be in writing, kept in the workplace, and available to employees... information about the plan or an explanation of their duties under the plan. (d) Employee alarm system. An...
Yin, H Shonna; Gupta, Ruchi S; Tomopoulos, Suzy; Wolf, Michael S; Mendelsohn, Alan L; Antler, Lauren; Sanchez, Dayana C; Lau, Claudia Hillam; Dreyer, Benard P
2013-01-01
Recognition of the complexity of asthma management has led to the development of asthma treatment guidelines that include the recommendation that all pediatric asthma patients receive a written asthma action plan. We assessed the readability, suitability, and characteristics of asthma action plans, elements that contribute to the effectiveness of action plan use, particularly for those with limited literacy. This was a descriptive study of 30 asthma action plans (27 state Department of Health (DOH)-endorsed, 3 national action plans endorsed by 6 states). (1) readability (as assessed by Flesch Reading Ease, Flesch-Kincaid, Gunning Fog, Simple Measure of Gobbledygook, Forcast), (2) suitability (Suitability Assessment of Materials [SAM], adequate: ≥ 0.4; unsuitable: <0.4), (3) action plan characteristics (peak flow vs symptom-based, symptoms, recommended actions). Mean (SD) overall readability grade level was 7.2 (1.1) (range = 5.7-9.8); 70.0% were above a sixth-grade level. Mean (SD) suitability score was 0.74 (0.14). Overall, all action plans were found to be adequate, although 40.0% had an unsuitable score in at least 1 factor. The highest percent of unsuitable scores were found in the categories of layout/typography (30.0%), learning stimulation/motivation (26.7%), and graphics (13.3%). There were no statistically significant differences between the average grade level or SAM score of state DOH developed action plans and those from or adapted from national organizations. Plans varied with respect to terms used, symptoms included, and recommended actions. Specific improvements in asthma action plans could maximize patient and parent understanding of appropriate asthma management and could particularly benefit individuals with limited literacy skills.
ERIC Educational Resources Information Center
de Gonzalez, Carmen Beatriz; Hernandez, Teresa; Kusch, Jim; Ryan, Charly
2004-01-01
Planning contains so much more than the written plan. Early in 2000, an invitation came from the Collaborative Action Research Network (CARN), to people experienced in action research who might want to help plan and present an action research event for elementary school science teachers in Venezuela, South America, in Autumn 2000. This article…
34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals with...
43 CFR 34.8 - Affirmative action plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Affirmative action plans. 34.8 Section 34..., applicants or recipients shall have an acceptable affirmative action plan which has been approved by the... paragraph (c) of this section. The affirmative action plan must set forth overall goals and timetables for...
34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals with...
Salt Storage Fact Sheet QUICK LINKS 2015-2019 Strategic Action Plan 2010-2014 Strategic Action Plan 2006 Strategic Action Plan OWRC Bylaws For More Information Brian Hall OWRC - State Agency Coordinating Program (Indirect Discharge) Primary Headwater Habitat Streams Remedial Action Plans (RAP) River Mile Maps
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
24 CFR 248.135 - Plans of action.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Plans of action. 248.135 Section... OF LOW INCOME HOUSING MORTGAGES Prepayments and Plans of Action Under the Low Income Housing Preservation and Resident Homeownership Act of 1990 § 248.135 Plans of action. (a) Submission. An owner seeking...
Króliczak, Gregory; Piper, Brian J; Frey, Scott H
2016-12-01
Data from focal brain injury and functional neuroimaging studies implicate a distributed network of parieto-fronto-temporal areas in the human left cerebral hemisphere as playing distinct roles in the representation of meaningful actions (praxis). Because these data come primarily from right-handed individuals, the relationship between left cerebral specialization for praxis representation and hand dominance remains unclear. We used functional magnetic resonance imaging (fMRI) to evaluate the hypothesis that strongly left-handed (right hemisphere motor dominant) adults also exhibit this left cerebral specialization. Participants planned familiar actions for subsequent performance with the left or right hand in response to transitive (e.g., "pounding") or intransitive (e.g. "waving") action words. In linguistic control trials, cues denoted non-physical actions (e.g., "believing"). Action planning was associated with significant, exclusively left-lateralized and extensive increases of activity in the supramarginal gyrus (SMg), and more focal modulations in the left caudal middle temporal gyrus (cMTg). This activity was hand- and gesture-independent, i.e., unaffected by the hand involved in subsequent action performance, and the type of gesture (i.e., transitive or intransitive). Compared directly with right-handers, left-handers exhibited greater involvement of the right angular gyrus (ANg) and dorsal premotor cortex (dPMC), which is indicative of a less asymmetric functional architecture for praxis representation. We therefore conclude that the organization of mechanisms involved in planning familiar actions is influenced by one's motor dominance. However, independent of hand dominance, the left SMg and cMTg are specialized for ideomotor transformations-the integration of conceptual knowledge and motor representations into meaningful actions. These findings support the view that higher-order praxis representation and lower-level motor dominance rely on dissociable mechanisms. Copyright © 2016 Elsevier Ltd. All rights reserved.
Króliczak, Gregory; Piper, Brian J.; Frey, Scott H.
2016-01-01
Data from focal brain injury and functional neuroimaging studies implicate a distributed network of parieto-fronto-temporal areas in the human left cerebral hemisphere as playing distinct roles in the representation of meaningful actions (praxis). Because these data come primarily from right-handed individuals, the relationship between left cerebral specialization for praxis representation and hand dominance remains unclear. We used functional magnetic resonance imaging (fMRI) to evaluate the hypothesis that strongly left-handed (right hemisphere motor dominant) adults also exhibit this left cerebral specialization. Participants planned familiar actions for subsequent performance with the left or right hand in response to transitive (e.g., “pounding”) or intransitive (e.g. “waving”) action words. In linguistic control trials, cues denoted non-physical actions (e.g., “believing”). Action planning was associated with significant, exclusively left-lateralized and extensive increases of activity in the supramarginal gyrus (SMg), and more focal modulations in the left caudal middle temporal gyrus (cMTg). This activity was hand- and gesture-independent, i.e., unaffected by the hand involved in subsequent action performance, and the type of gesture (i.e., transitive or intransitive). Compared directly with right-handers, left-handers exhibited greater involvement of the right angular gyrus (ANg) and dorsal premotor cortex (dPMC), which is indicative of a less asymmetric functional architecture for praxis representation. We therefore conclude that the organization of mechanisms involved in planning familiar actions is influenced by one’s motor dominance. However, independent of hand dominance, the left SMg and cMTg are specialized for ideomotor transformations—the integration of conceptual knowledge and motor representations into meaningful actions. These findings support the view that higher-order praxis representation and lower-level motor dominance rely on dissociable mechanisms. PMID:27020138
[Comprehensive drug safety plan in a health department].
Bujaldón-Querejeta, N; Aznar-Saliente, T; Esplá-González, S; Ruíz-Darbonnéns, S; Pons-Martínez, L; Talens-Bolos, A; Martínez-Ramírez, M; Camacho-Romera, D; Aranaz-Andrés, J M
2014-01-01
To develop and implement a comprehensive drug safety plan in a hospital for the years 2009-2011. Applying the Strengths Weaknesses/Limitations Opportunities Threats (SWOT) methodology, the baseline situation was analyzed and a broad strategy or plan was subsequently developed, defining the scope, responsibilities, objectives and strategic actions and indicators in order to measure the achievement of the results. A comprehensive drug safety plan with the main objective of identifying and reducing the medication-related problems in patients treated in the Hospital de San Juan in Alicante has been developed. The plan contains five strategic objectives, twenty strategic actions and the indicators to assess its outcomes. It also contains a timetable for its establishment and evaluation. Developing a comprehensive strategic plan allows the current situation relating to drug safety to be determined. The results obtained after its introduction will define its applicability. Due to the lack of publications of similar plans and results, the evaluation of this plan will be useful whether it is favorable or not. As a side benefit of the development, the multidisciplinary team continues to work on improving patient safety in the care process, and the safety culture continues to grow among the professionals. Copyright © 2013 SECA. Published by Elsevier Espana. All rights reserved.
Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi
2009-01-01
COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.
Sharing Pacific-Rim experiences in disasters: summary and action plan.
Arias, E H; Asai, Y; Chen, J C; Cheng, H K; Ishii, N; Kinugasa, T; Ko, P C; Koido, Y; Murayama, Y; Kwong, P W; Ukai, T
2001-01-01
The discussions in this theme provided an opportunity to address the unique hazards facing the Pacific Rim. Details of the methods used are provided in the preceding paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. Since the findings from the Theme 3 and Theme 7 groups were similar, the chairs of both groups presided over one workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. The main points developed during the presentations and discussion included: (1) communication, (2) coordination, (3) advance planning and risk assessment, and (4) resources and knowledge. Action plans were summarized in the following ideas: (1) plan disaster responses including the different types, identification of hazards, focusing training based on experiences, and provision of public education; (2) improve coordination and control; (3) maintain communications, assuming infrastructure breakdown; (4) maximize mitigation through standardized evaluations, the creation of a legal framework, and recognition of advocacy and public participation; and (5) provide resources and knowledge through access to existing therapies, the media, and increasing and decentralizing hospital inventories. The problems in the Asia-Pacific rim are little different from those encountered elsewhere in the world. They should be addressed in common with the rest of the world.
Controlling Attention through Action: Observing Actions Primes Action-Related Stimulus Dimensions
ERIC Educational Resources Information Center
Fagioli, Sabrina; Ferlazzo, Fabio; Hommel, Bernhard
2007-01-01
Previous findings suggest that planning an action "backward-primes" perceptual dimension related to this action: planning a grasp facilitates the processing of visual size information, while planning a reach facilitates the processing of location information. Here we show that dimensional priming of perception through action occurs even in the…
Sridharan, Sanjeev; Maplazi, Joanna; Shirodkar, Apurva; Richardson, Emma; Nakaima, April
2016-01-01
Background Mainstreaming of gender, equity, and human rights (GER) is an important focus of the World Health Organization (WHO) and other UN organizations. This paper explores the role of action plans in mainstreaming GER. This paper is informed by a theory-driven evaluation lens. Design A theory of change framework explored the following seven dimensions of how action plans can implement mainstreaming of GER: awareness of the foundations of GER; understanding of context; planning to impact GER; implementation for GER; monitoring, evaluation, and learning; planning for sustainability; agenda setting and buy-in. The seven dimensions were used to analyze the action plans. Reviewers also explored innovations within each of the action plans for the seven dimensions. Results GER mainstreaming is more prominent in the foundation, background, and planning components of the plan but becomes less so along the theory of change including implementation; monitoring and evaluation; sustainability; and agenda setting and buy-in. Conclusions Our analysis demonstrates that much more can be done to incorporate GER considerations into the action planning process. Nine specific recommendations are identified for WHO and other organizations. A theory-driven approach as described in the paper is potentially helpful for developing clarity by which action plans can help with mainstreaming GER considerations. PMID:27606968
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-05-24
This Decision Document discusses the selection of no further action as the recommended action for two sites located at the Bullen Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the five sites located at the Bullen Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, two sites are recommended for no further action. Sites at the Bullen Point radar installation recommended for no further action are: Old Landfill/Dump Site East (LF06) and Drum Storage Area (SS10).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swift, Ralph
Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say onmore » either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.« less
Intelligent flight control systems
NASA Technical Reports Server (NTRS)
Stengel, Robert F.
1993-01-01
The capabilities of flight control systems can be enhanced by designing them to emulate functions of natural intelligence. Intelligent control functions fall in three categories. Declarative actions involve decision-making, providing models for system monitoring, goal planning, and system/scenario identification. Procedural actions concern skilled behavior and have parallels in guidance, navigation, and adaptation. Reflexive actions are spontaneous, inner-loop responses for control and estimation. Intelligent flight control systems learn knowledge of the aircraft and its mission and adapt to changes in the flight environment. Cognitive models form an efficient basis for integrating 'outer-loop/inner-loop' control functions and for developing robust parallel-processing algorithms.
78 FR 23740 - Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
...] Notice of Availability of a Swine Brucellosis and Pseudorabies Proposed Action Plan AGENCY: Animal and... proposed action plan describing a potential new approach to managing swine brucellosis and pseudorabies...-0086) a notice that made a proposed action plan describing a potential new approach to managing swine...
29 CFR 1910.38 - Emergency action plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 5 2011-07-01 2011-07-01 false Emergency action plans. 1910.38 Section 1910.38 Labor... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Means of Egress § 1910.38 Emergency action plans. (a) Application. An employer must have an emergency action plan whenever an OSHA standard in this part requires one. The...
A decision framework for coordinating bioterrorism planning: lessons from the BioNet program.
Manley, Dawn K; Bravata, Dena M
2009-01-01
Effective disaster preparedness requires coordination across multiple organizations. This article describes a detailed framework developed through the BioNet program to facilitate coordination of bioterrorism preparedness planning among military and civilian decision makers. The authors and colleagues conducted a series of semistructured interviews with civilian and military decision makers from public health, emergency management, hazardous material response, law enforcement, and military health in the San Diego area. Decision makers used a software tool that simulated a hypothetical anthrax attack, which allowed them to assess the effects of a variety of response actions (eg, issuing warnings to the public, establishing prophylaxis distribution centers) on performance metrics. From these interviews, the authors characterized the information sources, technologies, plans, and communication channels that would be used for bioterrorism planning and responses. The authors used influence diagram notation to describe the key bioterrorism response decisions, the probabilistic factors affecting these decisions, and the response outcomes. The authors present an overview of the response framework and provide a detailed assessment of two key phases of the decision-making process: (1) pre-event planning and investment and (2) incident characterization and initial responsive measures. The framework enables planners to articulate current conditions; identify gaps in existing policies, technologies, information resources, and relationships with other response organizations; and explore the implications of potential system enhancements. Use of this framework could help decision makers execute a locally coordinated response by identifying the critical cues of a potential bioterrorism event, the information needed to make effective response decisions, and the potential effects of various decision alternatives.
Corrections in Grasp Posture in Response to Modifications of Action Goals
Hughes, Charmayne M. L.; Seegelke, Christian; Spiegel, Marnie Ann; Oehmichen, Corinna; Hammes, Julia; Schack, Thomas
2012-01-01
There is ample evidence that people plan their movements to ensure comfortable final grasp postures at the end of a movement. The end-state comfort effect has been found to be a robust constraint during unimanual movements, and leads to the inference that goal-postures are represented and planned prior to movement initiation. The purpose of this study was to examine whether individuals make appropriate corrections to ensure comfortable final goal postures when faced with an unexpected change in action goal. Participants reached for a horizontal cylinder and placed the left or right end of the object into the target disk. As soon as the participant began to move, a secondary stimuli was triggered, which indicated whether the intended action goal had changed or not. Confirming previous research, participants selected initial grasp postures that ensured end-state comfort during non-perturbed trials. In addition, participants made appropriate on-line corrections to their reach-to-grasp movements to ensure end-state comfort during perturbed trials. Corrections in grasp posture occurred early or late in the reach-to-grasp phase. The results indicate that individuals plan their movements to afford comfort at the end of the movement, and that grasp posture planning is controlled via both feedforward and feedback mechanisms. PMID:22970119
[Applicability of Children's Environment and Health Action Plan in Serbia].
Ilić, Miroslava Kristoforović
2010-01-01
The Children's Environment and Health Action Plan for Europe was adopted at the 4th Ministry Conference on Environment (the World Health Organization, 2004). It is focused on children health care against hazards originating from the human environment. In its conclusion, the need is expressed for the development of national plans in the field of Environmental and Children Health for European region by 2007. Mutual activities would be obligatory for each country and their realization should be the responsibility of Ministers of Health Care and Environmental Health. In our country, a draft version of this document was recently adopted, where the following priority regional goals are proposed: safe drinking water and adequate sanitation, injury prevention and adequate physical activity, clean indoor and outdoor air, the human environment without chemicals. Every segment has been explained in details through activities, expected results, indicators, sources of verification and the main participants in the project implementation. The end of the action plan period is proposed to be the year 2019. It is also followed by a defined set of indicators: exposure, activities and health status. The analyses of particular activities or data to be used have pointed to some drawbacks of this draft version, which can be overcome by respecting expert opinions.
ERIC Educational Resources Information Center
Araujo-Soares, Vera; McIntyre, Teresa; Sniehotta, Falko F.
2009-01-01
This paper aims to test the direct predictors of the theory of planned behaviour (TPB), action planning and coping planning as predictors of changes in physical activity (PA) in 157 adolescents (mean age: 12). TPB measures, the Action Planning and Coping Planning Scales (APCPS) and the International Physical Activity Questionnaires were measured…
Bailey, A N; Porter, K J; Hill, J L; Chen, Y; Estabrooks, P A; Zoellner, J M
2016-08-01
SIPsmartER is a 6-month behavioral intervention designed using a health literacy universal precautions approach that has been found effective at reducing sugary beverage intake in rural, low socioeconomic adults. The purpose of this mixed-methods study is to determine if health literacy status influenced participants' satisfaction and perceptions of each intervention component: small group classes, interactive-voice response (IVR) calls, personal action plans and self-monitoring logs. Of the 155 participants enrolled in SIPsmartER, 105 (68%) completed an interview-administered summative evaluation including 68 high and 37 low health literate participants. The quantitative findings show participant satisfaction with each intervention component was high (i.e. classes = 9.6, IVR calls = 8.1, action plans = 8.9-9.1, logs = 8.7 on a 10-point scale) and similar across both health literacy groups. The majority of qualitative responses were positive (81.8%) and code counts were comparable between literacy groups with a few exceptions. As compared with high health literacy respondents, low health literacy respondents more frequently mentioned liking the content and length of IVR calls, liking the motivational aspects of the personal action plans, and identified numeracy issues with the self-monitoring logs. Overall, applying a health literacy universal precautions approach is an effective and acceptable strategy for both high and low health literacy groups. © The Author 2016. Published by Oxford University Press. All rights reserved. For permissions, please email: journals.permissions@oup.com.
ERIC Educational Resources Information Center
Roy, Ken
2011-01-01
Use of animals in middle school science classrooms is a curriculum component worthy of consideration, providing proper investigation and planning are addressed. A responsible approach to this action, including safety, must be adopted for success. In this month's column, the author provides some suggestions on incorporating animals into the…
A Process Model of Principal Selection.
ERIC Educational Resources Information Center
Flanigan, J. L.; And Others
A process model to assist school district superintendents in the selection of principals is presented in this paper. Components of the process are described, which include developing an action plan, formulating an explicit job description, advertising, assessing candidates' philosophy, conducting interview analyses, evaluating response to stress,…
ERIC Educational Resources Information Center
Heydinger, Richard B.
1992-01-01
Issues management in college public relations involves identifying issues and trends early, debating alternative responses, deciding on the best approach, and designing and carrying out an action plan. Experience at the University of Minnesota with the issue of animal rights has shown the method can be very useful. (MSE)
Syvertsen, Amy K.; Flanagan, Constance A.; Stout, Michael D.
2009-01-01
The current study presented 1,933 adolescents from 13 schools with a scenario about a hypothetical peer's plan to “do something dangerous” at school and asked how likely they would be to respond with four different actions: intervene directly, tell a teacher or principal, discuss it with a friend but not an adult, and do nothing. High school students were less likely than those in middle school to say they would approach the peer directly or confide in a teacher or principal. Students were most likely to favor taking action on their own over all of the other response strategies. Students with positive perceptions of their schools were more likely to say they would do something rather than ignore their peer's dangerous intentions. These relationships were mediated by students’ beliefs that confiding in a teacher may have unfavorable consequences. Findings from this study support the important role schools play in creating a culture where students take responsibility for one another. PMID:20126300
Implementing an effective organization and governance structure for a radiology practice.
Muroff, Lawrence R
2004-01-01
Radiology practices that are well organized and effectively governed have a competitive advantage. Decisions are made rapidly, actions are taken decisively and in accordance with established policy, and each group member has a responsibility for practice building. Such groups are perceived by their peers, hospital administration, and community business leaders to be both formidable and effective. This paper details the mechanisms that facilitate planning for and implementing an efficient practice organization and governance structure. The tasks of group leaders are defined, as are the committees necessary for appropriate action. The integral roles of a mission statement and a business plan are discussed. Practices adopting the suggested organizational structure will be best positioned to survive in both good times and bad.
Using Correlation to Compute Better Probability Estimates in Plan Graphs
NASA Technical Reports Server (NTRS)
Bryce, Daniel; Smith, David E.
2006-01-01
Plan graphs are commonly used in planning to help compute heuristic "distance" estimates between states and goals. A few authors have also attempted to use plan graphs in probabilistic planning to compute estimates of the probability that propositions can be achieved and actions can be performed. This is done by propagating probability information forward through the plan graph from the initial conditions through each possible action to the action effects, and hence to the propositions at the next layer of the plan graph. The problem with these calculations is that they make very strong independence assumptions - in particular, they usually assume that the preconditions for each action are independent of each other. This can lead to gross overestimates in probability when the plans for those preconditions interfere with each other. It can also lead to gross underestimates of probability when there is synergy between the plans for two or more preconditions. In this paper we introduce a notion of the binary correlation between two propositions and actions within a plan graph, show how to propagate this information within a plan graph, and show how this improves probability estimates for planning. This notion of correlation can be thought of as a continuous generalization of the notion of mutual exclusion (mutex) often used in plan graphs. At one extreme (correlation=0) two propositions or actions are completely mutex. With correlation = 1, two propositions or actions are independent, and with correlation > 1, two propositions or actions are synergistic. Intermediate values can and do occur indicating different degrees to which propositions and action interfere or are synergistic. We compare this approach with another recent approach by Bryce that computes probability estimates using Monte Carlo simulation of possible worlds in plan graphs.
Autobiographical Planning and the Brain: Activation and Its Modulation by Qualitative Features.
Spreng, R Nathan; Gerlach, Kathy D; Turner, Gary R; Schacter, Daniel L
2015-11-01
To engage in purposeful behavior, it is important to make plans, which organize subsequent actions. Most studies of planning involve "look-ahead" puzzle tasks that are unrelated to personal goals. We developed a task to assess autobiographical planning, which involves the formulation of personal plans in response to real-world goals, and examined autobiographical planning in 63 adults during fMRI scanning. Autobiographical planning was found to engage the default network, including medial-temporal lobe and midline structures, and executive control regions in lateral pFC and parietal cortex and caudate. To examine how specific qualitative features of autobiographical plans modulate neural activity, we performed parametric modulation analyses. Ratings of plan detail, novelty, temporal distance, ease of plan formulation, difficulty in goal completion, and confidence in goal accomplishment were used as covariates in six hierarchical linear regression models. This modeling procedure removed shared variance among the ratings, allowing us to determine the independent relationship between ratings of interest and trial-wise BOLD signal. We found that specific autobiographical planning, describing a detailed, achievable, and actionable planning process for attaining a clearly envisioned future, recruited both default and frontoparietal brain regions. In contrast, abstract autobiographical planning, plans that were constructed from more generalized semantic or affective representations of a less tangible and distant future, involved interactions among default, sensory perceptual, and limbic brain structures. Specific qualities of autobiographical plans are important predictors of default and frontoparietal control network engagement during plan formation and reflect the contribution of mnemonic and executive control processes to autobiographical planning.
2007-01-01
gency Management Association ( NEMA ) to explore application of the Emergency Management Assistance Compact (EMAC) model to the task of identifying...organizations combined—are the norm . The challenge for government and the private sector is to ensure that donated goods and services from the latter...Association ( NEMA ). EOC – Emergency Operations Center – the central command and control facility responsible for carrying out emergency preparedness and
NASA Astrophysics Data System (ADS)
Keeler, A. G.; McNamara, D. E.; Irish, J. L.
2018-04-01
Most existing coastal climate-adaptation planning processes, and the research supporting them, tightly focus on how to use land use planning, policy tools, and infrastructure spending to reduce risks from rising seas and changing storm conditions. While central to community response to sea level rise, we argue that the exclusive nature of this focus biases against and delays decisions to take more discontinuous, yet proactive, actions to adapt—for example, relocation and aggressive individual protection investments. Public policies should anticipate real estate market responses to risk reduction to avoid large costs—social and financial—when and if sea level rise and other climate-related factors elevate the risks to such high levels that discontinuous responses become the least bad alternative.
Updated preparedness and response framework for influenza pandemics.
Holloway, Rachel; Rasmussen, Sonja A; Zaza, Stephanie; Cox, Nancy J; Jernigan, Daniel B
2014-09-26
The complexities of planning for and responding to the emergence of novel influenza viruses emphasize the need for systematic frameworks to describe the progression of the event; weigh the risk of emergence and potential public health impact; evaluate transmissibility, antiviral resistance, and severity; and make decisions about interventions. On the basis of experience from recent influenza responses, CDC has updated its framework to describe influenza pandemic progression using six intervals (two prepandemic and four pandemic intervals) and eight domains. This updated framework can be used for influenza pandemic planning and serves as recommendations for risk assessment, decision-making, and action in the United States. The updated framework replaces the U.S. federal government stages from the 2006 implementation plan for the National Strategy for Pandemic Influenza (US Homeland Security Council. National strategy for pandemic influenza: implementation plan. Washington, DC: US Homeland Security Council; 2006. Available at http://www.flu.gov/planning-preparedness/federal/pandemic-influenza-implementation.pdf). The six intervals of the updated framework are as follows: 1) investigation of cases of novel influenza, 2) recognition of increased potential for ongoing transmission, 3) initiation of a pandemic wave, 4) acceleration of a pandemic wave, 5) deceleration of a pandemic wave, and 6) preparation for future pandemic waves. The following eight domains are used to organize response efforts within each interval: incident management, surveillance and epidemiology, laboratory, community mitigation, medical care and countermeasures, vaccine, risk communications, and state/local coordination. Compared with the previous U.S. government stages, this updated framework provides greater detail and clarity regarding the potential timing of key decisions and actions aimed at slowing the spread and mitigating the impact of an emerging pandemic. Use of this updated framework is anticipated to improve pandemic preparedness and response in the United States. Activities and decisions during a response are event-specific. These intervals serve as a reference for public health decision-making by federal, state, and local health authorities in the United States during an influenza pandemic and are not meant to be prescriptive or comprehensive. This framework incorporates information from newly developed tools for pandemic planning and response, including the Influenza Risk Assessment Tool and the Pandemic Severity Assessment Framework, and has been aligned with the pandemic phases restructured in 2013 by the World Health Organization.
The role of action planning and plan enactment for smoking cessation
2013-01-01
Background Several studies have reemphasized the role of action planning. Yet, little attention has been paid to the role of plan enactment. This study assesses the determinants and the effects of action planning and plan enactment on smoking cessation. Methods One thousand and five participants completed questionnaires at baseline and at follow-ups after one and six months. Factors queried were part of the I-Change model. Descriptive analyses were used to assess which plans were enacted the most. Multivariate linear regression analyses were used to assess whether the intention to quit smoking predicted action planning and plan enactment, and to assess which factors would predict quitting behavior. Subsequently, both multivariate and univariate regression analyses were used to assess which particular action plans would be most effective in predicting quitting behavior. Similar analyses were performed among a subsample of smokers prepared to quit within one month. Results Smokers who intended to quit smoking within the next month had higher levels of action planning than those intending to quit within a year. Additional predictors of action planning were being older, being female, having relatively low levels of cigarette dependence, perceiving more positive and negative consequences of quitting, and having high self-efficacy toward quitting. Plan enactment was predicted by baseline intention to quit and levels of action planning. Regression analysis revealed that smoking cessation after six months was predicted by low levels of depression, having a non-smoking partner, the intention to quit within the next month, and plan enactment. Only 29% of the smokers who executed relatively few plans had quit smoking versus 59% of the smokers who executed many plans. The most effective preparatory plans for smoking cessation were removing all tobacco products from the house and choosing a specific date to quit. Conclusion Making preparatory plans to quit smoking is important because it also predicts plan enactment, which is predictive of smoking cessation. Not all action plans were found to be predictive of smoking cessation. The effects of planning were not very much different between the total sample and smokers prepared to quit within one month. PMID:23622256
NASA Astrophysics Data System (ADS)
Lackett, J.; Ojima, D. S.; McNeeley, S.
2017-12-01
As climate change impacts become more apparent in our environment, action is needed to enhance the social-ecological system resilience. Incorporating principles which lead to actionable research and project co-development, when appropriate, will facilitate building linkages between the research and the natural resource management communities. In order to develop strategies to manage for climatic and ecosystem changes, collaborative actions are needed between researchers and resource managers to apply appropriate knowledge of the ecosystem and management environments to enable feasible solutions and management actions to respond to climate change. Our team has been involved in developing and establishing a research and engagement center, the North Central Climate Science Center (NC CSC), for the US Department of Interior, to support the development and translation of pertinent climate science information to natural resource managers in the north central portion of the United States. The NC CSC has implemented a platform to support the Resource for Vulnerability Assessment, Adaptation, and Mitigation Projects (ReVAMP) with research, engagement, and training activities to support resource managers and researchers. These activities are aimed at the co-production of appropriate response strategies to climate change in the region, in particular to drought-related responses. Through this platform we, with other partners in the region, including the Department of Interior and the Department of Agriculture, are bringing various training tools, climate information, and management planning tools to resource managers. The implementation of ReVAMP has led to development of planning efforts which include a more explicit representation of climate change as a driver of drought events in our region. Scenario planning provides a process which integrates management goals with possible outcomes derived from observations and simulations of ecological impacts of climate change. Co-development of management options under these various scenarios have allowed for guidance about further research needed, observations needed to better monitor ecological conditions under climate changes, and adaptive management practices to increase resilience.
Report of the Tape Recorder Action Plan Committee, 21 March 1972
NASA Technical Reports Server (NTRS)
1972-01-01
A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.
Special population planner 4 : an open source release.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuiper, J.; Metz, W.; Tanzman, E.
2008-01-01
Emergencies like Hurricane Katrina and the recent California wildfires underscore the critical need to meet the complex challenge of planning for individuals with special needs and for institutionalized special populations. People with special needs and special populations often have difficulty responding to emergencies or taking protective actions, and emergency responders may be unaware of their existence and situations during a crisis. Special Population Planner (SPP) is an ArcGIS-based emergency planning system released as an open source product. SPP provides for easy production of maps, reports, and analyses to develop and revise emergency response plans. It includes tools to manage amore » voluntary registry of data for people with special needs, integrated links to plans and documents, tools for response planning and analysis, preformatted reports and maps, and data on locations of special populations, facility and resource characteristics, and contacts. The system can be readily adapted for new settings without programming and is broadly applicable. Full documentation and a demonstration database are included in the release.« less
The role of action control and action planning on fruit and vegetable consumption.
Zhou, Guangyu; Gan, Yiqun; Miao, Miao; Hamilton, Kyra; Knoll, Nina; Schwarzer, Ralf
2015-08-01
Globally, fruit and vegetable intake is lower than recommended despite being an important component to a healthy diet. Adopting or maintaining a sufficient amount of fruit and vegetables in one's diet may require not only motivation but also self-regulatory processes. Action control and action planning are two key volitional determinants that have been identified in the literature; however, it is not fully understood how these two factors operate between intention and behavior. Thus, the aim of the current study was to explore the roles of action control and action planning as mediators between intentions and dietary behavior. A longitudinal study with three points in time was conducted. Participants (N = 286) were undergraduate students and invited to participate in a health behavior survey. At baseline (Time 1), measures of intention and fruit and vegetable intake were assessed. Two weeks later (Time 2), action control and action planning were assessed as putative sequential mediators. At Time 3 (two weeks after Time 2), fruit and vegetable consumption was measured as the outcome. The results revealed action control and action planning to sequentially mediate between intention and subsequent fruit and vegetable intake, controlling for baseline behavior. Both self-regulatory constructs, action control and action planning, make a difference when moving from motivation to action. Our preliminary evidence, therefore, suggests that planning may be more proximal to fruit and vegetable intake than action control. Further research, however, needs to be undertaken to substantiate this conclusion. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Wang, S. Y.; Ho, C. C.; Chang, L. C.
2017-12-01
The public use water in Hsinchu are mainly supplied from Baoshan Reservoir, Second Baoshan Reservoir, Yongheshan Reservoir and Longen Weir. However, the increasing water demand, caused by development of the Hsinchu Science and Industrial Park, results in supply stable water getting more difficult. For stabilize water supply in Hsinchu, the study applies long-term and short-term plans to fulfill the water shortage. Developing an efficient methodology to define a cost-effective action portfolio is an important task. Hence, the study develops a novel decision model, the Stochastic Programming with Recourse Decision Model (SPRDM), to estimate a cost-effective action portfolio. The first-stage of SPRDM determine the long-term action portfolio and the portfolio accompany recourse information (the probability for water shortage event). The second-stage of SPRDM optimize the cost-effective action portfolio in response to the recourse information. In order to consider the uncertainty of reservoir sediment and demand growth, the study set 9 scenarios comprise optimistic, most likely, and pessimistic reservoir sediment and demand growth. The results show the optimal action portfolio consist of FengTain Lake and Panlon Weir, Hsinchu Desalination Plant, Domestic and Industrial Water long-term plans, and Emergency Backup Well, Irrigation Water Transference, Preliminary Water Rationing, Advanced Water Rationing and Water Transport from Other Districts short-term plans. The minimum expected cost of optimal action portfolio is NT$1.1002 billion. The results can be used as a reference for decision making because the results have considered the uncertainty of varied hydrology, reservoir sediment, and water demand growth.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
... assess disaster logistics planning and response capabilities and identify areas of relative strength and...; Logistics Capability Assessment Tool (LCAT) AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice...: Collection of Information Title: Logistics Capability Assessment Tool (LCAT). Type of Information Collection...
The Emotional Dimensions of the Problem-Solving Process.
ERIC Educational Resources Information Center
Hill, Barbara; And Others
1979-01-01
Predictable affective responses are evoked during each phase of a group or organizational problem-solving process. With the needs assessment phase come hope and energy; with goal-setting, confusion and dissatisfaction; with action planning, involvement and accomplishment; with implementation, "stage fright" and joy; with evaluation, pride or…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2008-0022... Preparedness Program Manual AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice of availability. SUMMARY: The Federal Emergency Management Agency (FEMA) is issuing two final guidance documents...
NASA Astrophysics Data System (ADS)
Miller, B. W.; Schuurman, G. W.; Symstad, A.; Fisichelli, N. A.; Frid, L.
2017-12-01
Managing natural resources in this era of anthropogenic climate change is fraught with uncertainties around how ecosystems will respond to management actions and a changing climate. Scenario planning (oftentimes implemented as a qualitative, participatory exercise for exploring multiple possible futures) is a valuable tool for addressing this challenge. However, this approach may face limits in resolving responses of complex systems to altered climate and management conditions, and may not provide the scientific credibility that managers often require to support actions that depart from current practice. Quantitative information on projected climate changes and ecological responses is rapidly growing and evolving, but this information is often not at a scale or in a form that is `actionable' for resource managers. We describe a project that sought to create usable information for resource managers in the northern Great Plains by combining qualitative and quantitative methods. In particular, researchers, resource managers, and climate adaptation specialists co-produced a simulation model in conjunction with scenario planning workshops to inform natural resource management in southwest South Dakota. Scenario planning for a wide range of resources facilitated open-minded thinking about a set of divergent and challenging, yet relevant and plausible, climate scenarios and management alternatives that could be implemented in the simulation. With stakeholder input throughout the process, we built a simulation of key vegetation types, grazing, exotic plants, fire, and the effects of climate and management on rangeland productivity and composition. By simulating multiple land management jurisdictions, climate scenarios, and management alternatives, the model highlighted important tradeoffs between herd sizes and vegetation composition, and between the short- versus long-term costs of invasive species management. It also identified impactful uncertainties related to the effects of fire and grazing on vegetation. Ultimately, this integrative and iterative approach yielded counter-intuitive and surprising findings, and resulted in a more tractable set of possible futures for resource management planning.
ERIC Educational Resources Information Center
Kusch, Jim; Rebolledo, Geisha; Ryan, Charly
2005-01-01
This paper responds to a call seeking presenters for an action-research event for elementary-school science teachers in Venezuela. The authors planned on the assumption that the participants would wish to leave with plans for introducing action-research approaches into their practice. In previous writing on action research, the various protocols…
Evaluating the Impact of Action Plans on Trainee Compliance with Learning Objectives
ERIC Educational Resources Information Center
Aumann, Michael J.
2013-01-01
This mixed methods research study evaluated the use of technology-based action plans as a way to help improve compliance with the learning objectives of an online training event. It explored how the action planning strategy impacted subjects in a treatment group and compared them to subjects in a control group who did not get the action plan. The…
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plan amendments. 447.256 Section 447.256 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on State plans and State plan amendments, is taken in accordance with subpart B of part 430 of this chapter...
42 CFR 447.256 - Procedures for CMS action on assurances and State plan amendments.
Code of Federal Regulations, 2013 CFR
2013-10-01
... plan amendments. 447.256 Section 447.256 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... action on assurances and State plan amendments. (a) Criteria for approval. (1) CMS approval action on State plans and State plan amendments, is taken in accordance with subpart B of part 430 of this chapter...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false State highway-rail grade crossing action plans... PLANS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway-rail grade crossings in the ten States that...
49 CFR 234.11 - State highway-rail grade crossing action plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false State highway-rail grade crossing action plans... PLANS Reports and Plans § 234.11 State highway-rail grade crossing action plans. (a) Purpose. The purpose of this section is to reduce collisions at highway-rail grade crossings in the ten States that...
Visual Power Data Files for Equal Employment Opportunity (EEO)
The Visual Powerfiles for EEO is an information management and reporting system designed to meet Federal requirements for the agency's Equal Employment Opportunity (EEO) function in accordance with several civil rights laws and regulations. EPA OCR is responsible for monitoring and evaluating the effectiveness of affirmative programs, conducting workforce ad hoc anlysis and summaries for data related to applicant flow, new hires, promotions, awards, training, disciplinary actions, and selection procedures., and developing plans and actions for an annual Management Directive 715.
Perceived stops to suicidal thoughts, plans, and actions in persons experiencing psychosis.
Gooding, P A; Sheehy, K; Tarrier, N
2013-01-01
Suicide has been conceived as involving a continuum, whereby suicidal plans and acts emerge from thoughts about suicide. Suicide prevention strategies need to determine whether different responses are needed at these points on the continuum. This study investigates factors that were perceived to counter suicidal ideation, plans, and acts. The 36 participants, all of whom had had experiences of psychosis and some level of suicidality, were presented with a vignette describing a protagonist with psychotic symptoms. They were asked to indicate what would counter the suicidal thoughts, plans, and acts of the protagonist described in the vignette. Qualitative techniques were first used to code these free responses into themes/categories. Correspondence analysis was then applied to the frequency of responses in each of these categories. Social support was identified as a strong counter to suicidal ideation but not as a counter to suicidal plans or acts. Help from health professionals was strongly related to the cessation of suicidal plans as were the opinions of the protagonist's children. Changing cognitions and strengthening psychological resources were more weakly associated with the cessation of suicidal ideation and plans. The protagonist's children were considered potentially helpful in addressing suicidal acts. These results suggest that both overlapping and nonoverlapping factors need to be considered in understanding suicide prevention, dependent on whether individuals are thinking about, planning, or attempting suicide.
The Neural Representation of Prospective Choice during Spatial Planning and Decisions
Kaplan, Raphael; Koster, Raphael; Penny, William D.; Burgess, Neil; Friston, Karl J.
2017-01-01
We are remarkably adept at inferring the consequences of our actions, yet the neuronal mechanisms that allow us to plan a sequence of novel choices remain unclear. We used functional magnetic resonance imaging (fMRI) to investigate how the human brain plans the shortest path to a goal in novel mazes with one (shallow maze) or two (deep maze) choice points. We observed two distinct anterior prefrontal responses to demanding choices at the second choice point: one in rostrodorsal medial prefrontal cortex (rd-mPFC)/superior frontal gyrus (SFG) that was also sensitive to (deactivated by) demanding initial choices and another in lateral frontopolar cortex (lFPC), which was only engaged by demanding choices at the second choice point. Furthermore, we identified hippocampal responses during planning that correlated with subsequent choice accuracy and response time, particularly in mazes affording sequential choices. Psychophysiological interaction (PPI) analyses showed that coupling between the hippocampus and rd-mPFC increases during sequential (deep versus shallow) planning and is higher before correct versus incorrect choices. In short, using a naturalistic spatial planning paradigm, we reveal how the human brain represents sequential choices during planning without extensive training. Our data highlight a network centred on the cortical midline and hippocampus that allows us to make prospective choices while maintaining initial choices during planning in novel environments. PMID:28081125
2014-01-30
results of previous audits conducted on the data systems 1The source of this review is the Senate...locations within the CENTCOM area of responsibility. We conducted this performance audit from December 2012 to January 2014 in accordance with...generally accepted government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to
Caudroit, Johan; Boiché, Julie; Stephan, Yannick
2014-01-01
Using a moderated mediation model, the present study investigated whether the mediation of intention into physical activity (PA) behaviour via action planning depends on the level of coping planning. A four-month prospective study was conducted among 157 French adults, who were recruited through a web-based survey. They were administrated measures of behavioural intention and sociodemographic variables at baseline and action and coping planning and PA four months later. Action planning partially mediated the contribution of intention on PA level. However, this indirect effect was conditional on the level of coping planning, insofar as action planning acted as a mediator of the intention-PA relationship only for individuals with high level of coping planning. The results highlight the complexity of the relationship between intention and behaviour and provide evidence for the distinct role of both forms of planning.
Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2009-07-01
EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.
49 CFR 27.11 - Remedial action, voluntary action and compliance planning.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 1 2011-10-01 2011-10-01 false Remedial action, voluntary action and compliance....11 Remedial action, voluntary action and compliance planning. (a) Remedial action. (1) If the... discrimination not occurred. (b) Voluntary action. A recipient may take steps, in addition to any action that is...
Evans, Stewart M; Gebbels, Susan; Stockill, Joanna M
2008-01-01
The objective of this project was to empower people of Blyth Valley in Northumberland (northeast England) to contribute to the management of their coastal heritage. A group of volunteers, the Links Conservation Group, working in collaboration with the environmental managers (Blyth Valley Borough Council), scientists, local specialists and other volunteers, surveyed the biodiversity, social, cultural and industrial history and profiles of the dunes, as well as their perceived value to local residents. The Group used this information to develop management plans for the dunes. The recommendations have contributed to planning processes at three levels: (i) national coastal management plans; (ii) regional plans; and (iii) plans for further action at the local community level.
ONR (Office of Naval Research) Research in Distributed Reasoning and Planning.
1987-05-01
Reasoning about Actions and Plans, Timberline Lodge , Timberline , Oregon (1987). [62] Lansky, A.L. "GEMPLAN: Event-based Planning Through Temporal...Actions and Plans, Timberline Lodge , Timberline , Oregon (1987). [71] Litman, D. Plan Recognition and Discourse Analysis. PhD thesis, University of...Workshop on Reasoning about Actions and Plans, Timberline Lodge , Timberlinie. Oregon (1987). [74] Manna, Z. and P.Wolper, "Synthesis of Communicating
Spiegel, M A; Koester, D; Weigelt, M; Schack, T
2012-02-16
How much cognitive effort does it take to change a movement plan? In previous studies, it has been shown that humans plan and represent actions in advance, but it remains unclear whether or not action planning and verbal working memory share cognitive resources. Using a novel experimental paradigm, we combined in two experiments a grasp-to-place task with a verbal working memory task. Participants planned a placing movement toward one of two target positions and subsequently encoded and maintained visually presented letters. Both experiments revealed that re-planning the intended action reduced letter recall performance; execution time, however, was not influenced by action modifications. The results of Experiment 2 suggest that the action's interference with verbal working memory arose during the planning rather than the execution phase of the movement. Together, our results strongly suggest that movement planning and verbal working memory share common cognitive resources. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
Anticipatory Action Planning Increases from 3 to 10 Years of Age in Typically Developing Children
ERIC Educational Resources Information Center
Jongbloed-Pereboom, Marjolein; Nijhuis-van der Sanden, Maria W. G.; Saraber-Schiphorst, Nicole; Craje, Celine; Steenbergen, Bert
2013-01-01
The primary aim of this study was to assess the development of action planning in a group of typically developing children aged 3 to 10 years (N = 351). The second aim was to assess reliability of the action planning task and to relate the results of the action planning task to results of validated upper limb motor performance tests. Participants…
Emergency Response System for Pollution Accidents in Chemical Industrial Parks, China
Duan, Weili; He, Bin
2015-01-01
In addition to property damage and loss of lives, environment pollution, such as water pollution and air pollution caused by accidents in chemical industrial parks (CIPs) is a significant issue in China. An emergency response system (ERS) was therefore planned to properly and proactively cope with safety incidents including fire and explosions occurring in the CIPs in this study. Using a scenario analysis, the stages of emergency response were divided into three levels, after introducing the domino effect, and fundamental requirements of ERS design were confirmed. The framework of ERS was composed mainly of a monitoring system, an emergency command center, an action system, and a supporting system. On this basis, six main emergency rescue steps containing alarm receipt, emergency evaluation, launched corresponding emergency plans, emergency rescue actions, emergency recovery, and result evaluation and feedback were determined. Finally, an example from the XiaoHu Chemical Industrial Park (XHCIP) was presented to check on the integrality, reliability, and maneuverability of the ERS, and the result of the first emergency drill with this ERS indicated that the developed ERS can reduce delays, improve usage efficiency of resources, and raise emergency rescue efficiency. PMID:26184260
Emergency Response System for Pollution Accidents in Chemical Industrial Parks, China.
Duan, Weili; He, Bin
2015-07-10
In addition to property damage and loss of lives, environment pollution, such as water pollution and air pollution caused by accidents in chemical industrial parks (CIPs) is a significant issue in China. An emergency response system (ERS) was therefore planned to properly and proactively cope with safety incidents including fire and explosions occurring in the CIPs in this study. Using a scenario analysis, the stages of emergency response were divided into three levels, after introducing the domino effect, and fundamental requirements of ERS design were confirmed. The framework of ERS was composed mainly of a monitoring system, an emergency command center, an action system, and a supporting system. On this basis, six main emergency rescue steps containing alarm receipt, emergency evaluation, launched corresponding emergency plans, emergency rescue actions, emergency recovery, and result evaluation and feedback were determined. Finally, an example from the XiaoHu Chemical Industrial Park (XHCIP) was presented to check on the integrality, reliability, and maneuverability of the ERS, and the result of the first emergency drill with this ERS indicated that the developed ERS can reduce delays, improve usage efficiency of resources, and raise emergency rescue efficiency.
The Australian response: pandemic influenza preparedness.
Horvath, John S; McKinnon, Moira; Roberts, Leslee
2006-11-20
Australia's preparedness for a potential influenza pandemic involves many players, from individual health carers to interdepartmental government committees. It embraces a wide number of strategies from the management of the disease to facilitating business continuity. The key strategy underlying Australia's planned response is an intensive effort to reduce transmission of the virus. This includes actions to reduce the likelihood of entry of the virus into the country and to contain outbreaks when they occur. Containment will provide time to allow production of a matched vaccine. The health strategies are outlined in the Australian health management plan for pandemic influenza. The plan is accompanied by technical annexes setting out key considerations and guidelines in the areas of clinical management and infection control. National plans present overall strategies and guidance, but the operational details can only be determined by individual states and territories, regions, and the services themselves. Primary health care practices will be on the frontline of an influenza pandemic. Every practice needs a plan that defines the roles of staff, incorporates infection control and staff protection measures, and considers business continuity. Most importantly, a practice needs to know how to implement that plan.
NASA Technical Reports Server (NTRS)
1987-01-01
This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
28 CFR 115.404 - Audit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Audit corrective action plan. 115.404 Section 115.404 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Auditing and Corrective Action § 115.404 Audit corrective action plan. (a) A finding of...
Behaviors in Advance Care Planning and ACtions Survey (BACPACS): development and validation part 1.
Kassam, Aliya; Douglas, Maureen L; Simon, Jessica; Cunningham, Shannon; Fassbender, Konrad; Shaw, Marta; Davison, Sara N
2017-11-22
Although advance care planning (ACP) is fairly well understood, significant barriers to patient participation remain. As a result, tools to assess patient behaviour are required. The objective of this study was to improve the measurement of patient engagement in ACP by detecting existing survey design issues and establishing content and response process validity for a new survey entitled Behaviours in Advance Care Planning and ACtions Survey (BACPACS). We based our new tool on that of an existing ACP engagement survey. Initial item reduction was carried out using behavior change theories by content and design experts to help reduce response burden and clarify questions. Thirty-two patients with chronic diseases (cancer, heart failure or renal failure) were recruited for the think aloud cognitive interviewing with the new, shortened survey evaluating patient engagement with ACP. Of these, n = 27 had data eligible for analysis (n = 8 in round 1 and n = 19 in rounds 2 and 3). Interviews were audio-recorded and analyzed using the constant comparison method. Three reviewers independently listened to the interviews, summarized findings and discussed discrepancies until consensus was achieved. Item reduction from key content expert review and conversation analysis helped decrease number of items from 116 in the original ACP Engagement Survey to 24-38 in the new BACPACS depending on branching of responses. For the think aloud study, three rounds of interviews were needed until saturation for patient clarity was achieved. The understanding of ACP as a construct, survey response options, instructions and terminology pertaining to patient engagement in ACP warranted further clarification. Conversation analysis, content expert review and think aloud cognitive interviewing were useful in refining the new survey instrument entitled BACPACS. We found evidence for both content and response process validity for this new tool.
Vingerhoets, Guy; Vandekerckhove, Elisabeth; Honoré, Pieterjan; Vandemaele, Pieter; Achten, Eric
2011-06-01
This study aims to reveal the neural correlates of planning and executing tool use pantomimes and explores the brain's response to pantomiming the use of unfamiliar tools. Sixteen right-handed volunteers planned and executed pantomimes of equally graspable familiar and unfamiliar tools while undergoing fMRI. During the planning of these pantomimes, we found bilateral temporo-occipital and predominantly left hemispheric frontal and parietal activation. The execution of the pantomimes produced additional activation in frontal and sensorimotor regions. In the left posterior parietal region both familiar and unfamiliar tool pantomimes elicit peak activity in the anterior portion of the lateral bank of the intraparietal sulcus--A region associated with the representation of action goals. The cerebral activation during these pantomimes is remarkably similar for familiar and unfamiliar tools, and direct comparisons revealed only few differences. First, the left cuneus is significantly active during the planning of pantomimes of unfamiliar tools, reflecting increased visual processing of the novel objects. Second, executing (but not planning) familiar tool pantomimes showed significant activation on the convex portion of the inferior parietal lobule, a region believed to serve as a repository for skilled object-related gestures. Given the striking similarity in brain activation while pantomiming familiar and unfamiliar tools, we argue that normal subjects use both action semantics and function from structure inferences simultaneously and interactively to give rise to flexible object-to-goal directed behavior. Copyright © 2010 Wiley-Liss, Inc.
California Endangered Species Resource Guide.
ERIC Educational Resources Information Center
California State Dept. of Education, Los Angeles.
This document was developed in response to California Senate Bill No. 885, "The Endangered Species Education Project," that called for a statewide program in which schools adopt a local endangered species, research past and current efforts to preserve the species' habitat, develop and implement an action plan to educate the community…
Administrative Plans. STIP II (Skill Training Improvement Programs Round II).
ERIC Educational Resources Information Center
Los Angeles Community Coll. District, CA.
Personnel policies, job responsibilities, and accounting procedures are summarized for the Los Angeles Community College District's Skill Training Improvement Programs (STIP II). This report first cites references to the established personnel and affirmative action procedures governing the program and then presents an organizational chart for the…
Merit Pay and Faculty Evaluation.
ERIC Educational Resources Information Center
Hudgins, James L.
A program linking merit pay and faculty evaluation was initiated at Sumter Area Technical College (SATC) in Sumter, South Carolina, in 1978. The performance-based evaluation system focuses on three elements: the job description, which identifies professional responsibilities and how they relate to the college's mission; the individual action plan;…
ERIC Educational Resources Information Center
Office of Civil Defense (DOD), Washington, DC.
Civil defense is a planned, coordinated action to protect the population during any emergency whether arising from thermonuclear attack or natural disaster. The Federal Government has assumed four responsibilities--(1) to keep track of the nature of the threat which the civil defense program must meet, (2) to prepare and disseminate information…
77 FR 15125 - Notice of Lodging of Second Consent Decree Under the Clean Air Act
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
... Kansas v. Coffeyville Resources Refining & Marketing, LLC et. al., 04-cv-01064 (D. Kan. 2004), was lodged... Decree in this action (Docket No. 8) that required Defendant Coffeyville Resources Refining & Marketing... Comprehensive Environmental Response, Compensation, and Liability Act, and the Emergency Planning and Community...
Adolescents, AIDS and HIV: A Community-Wide Responsibility.
ERIC Educational Resources Information Center
Center for Population Options, Washington, DC.
This report explores policy initiatives, priorities, and plans of action recommended to policymakers with respect to a commitment to education for youth on prevention of Human Immunodeficiency Virus (HIV) infection and Acquired Immune Deficiency Syndrome (AIDS). Young people with AIDS/HIV infection, can be offered compassion, hope, and support.…
40 CFR 307.22 - Preauthorization of response actions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... remedial investigation and feasibility study shall, in addition to the requirements in paragraph (b) of this section, include: (1) The scope of the proposed study; (2) A proposed site sampling plan and... recent draft of any pending agreement, reached between such parties and the Federal Government; and (2...
ERIC Educational Resources Information Center
Research for Better Schools, Inc., Philadelphia, PA.
The process for providing a "thorough and efficient" (T & E) education according to New Jersey statutes and regulations involves six basic steps. This document suggests procedures for handling the fifth step, educational program evaluation. Processes discussed include committee formation, evaluation planning, action plan…
Pedagogical Content Knowledge in Mathematical Modelling Instruction
ERIC Educational Resources Information Center
Tan, Liang Soon; Ang, Keng Cheng
2012-01-01
This paper posits that teachers' pedagogical content knowledge in mathematical modelling instruction can be demonstrated in the crafting of action plans and expected teaching and learning moves via their lesson images (Schoenfeld, 1998). It can also be developed when teachers shape appropriate teaching moves in response to students' learning…
Anthony, Christy; Thomas, Tito Joe; Berg, Bridget M; Burke, Rita V; Upperman, Jeffrey S
2017-01-01
Recent incidents have demonstrated that the US health system is unprepared for infectious pandemics resulting in a pediatric surge. Development of efficient plans and a structured and coordinated regional response to pediatric pandemic surge remains an opportunity. To address this gap, we conducted a literature review to assess current efforts, propose a response plan structure, and recommend policy actions. A literature review, utilizing MEDLINE and PubMed, through March 2017 identified articles regarding infectious disease pandemics affecting the US pediatric population. After review of current literature, a proposed response plan structure for a pediatric pandemic surge was designed. Inclusion and exclusion criteria reduced an initial screening of 1,787 articles to 162 articles. Articles ranged in their discussion of pediatric pandemic surge. Review of the articles led to the proposal of organizing the results according to 4 S's; (1) Structure, (2) Staff, (3) Stuff (Resources), and (4) Space. The review has supported the concern that the US health system is unprepared for a pediatric surge induced by infectious disease pandemics. Common themes suggest that response plans should reflect the 4Ss and national guidelines must be translated into regional response systems that account for local nuances.
Strategic Plan for the Spanish Academy of Dermatology and Venerology (AEDV): FuturAEDV 2013-2017.
Ribera Pibernat, M; Moreno Jiménez, J C; Valcuende Cavero, F; Soto de Delás, J; Vázquez Veiga, H; Lázaro Ochaíta, P; Giménez Arnau, A
2014-09-01
The Spanish Academy of Dermatology and Venereology (AEDV) has decided that a Strategic Plan is needed to help the association adapt to new circumstances and anticipate future developments. 1) To position the AEDV as a medical association that can exert an influence in everything related to dermatology. 2) To contribute to the development of the specialty, strengthening the prestige and reputation of dermatology and dermatologists. 3) To establish a model for operating and strategic thinking that can be handed on to successive Boards of Directors and will enable the Academy to identify future challenges. The approach used to develop the Strategic Plan was as follows: analysis of trends in the health care system; assessment of the current situation of AEDV and of dermatology in general through an internal analysis based on surveys and interviews with academics; analysis of strengths, weaknesses, opportunities, and threats; preparation of a mission statement; and identification, development, and implementation of a strategy map prioritizing strategic lines of action. The strategy map set out 16 general goals grouped into 4 main topics (achieving the vision, internal and external customers, internal processes, and innovation) and detailed in an action plan with 19 initiatives, each with specific actions. The plan will be monitored by the Strategic Plan Monitoring Committee, which is made up of the members of the Standing Committee and the chairs of the 9 Technical Committees responsible for implementing the initiatives. The Functional Plan should guide the management of AEDV until 2017, and its implementation will enable the association to contribute to the development and prestige of the specialty and position itself as a reference in terms of its functional model. Copyright © 2014 Elsevier España, S.L.U. y AEDV. All rights reserved.
Strategic Science for Coral Ecosystems 2007-2011
,
2010-01-01
Shallow and deep coral ecosystems are being imperiled by a combination of stressors. Climate change, unsustainable fishing practices, and disease are transforming coral communities at regional to global scales. At local levels, excessive amounts of sediments, nutrients, and contaminants are also impacting the many benefits that healthy coral ecosystems provide. This Plan, Strategic Science for Coral Ecosystems, describes the information needs of resource managers and summarizes current research being conducted by U.S. Geological Survey (USGS) scientists and partners. It outlines important research actions that need to be undertaken over the next five years to achieve more accurate forecasting of future conditions and develop more effective decision-support tools to adaptively manage coral ecosystems. The overarching outcome of this Plan, if fully implemented, would be in transferring relevant knowledge to decision-makers, enabling them to better protect and sustain coral ecosystem services. These services include sources of food, essential habitat for fisheries and protected species, protection of coastlines from wave damage and erosion, recreation, and cultural values for indigenous communities. The USGS has a long history of research and monitoring experience in studying ancient and living coral communities and serving many stakeholders. The research actions in this Plan build on the USGS legacy of conducting integrated multidisciplinary science to address complex environmental issues. This Plan is responsive to Federal legislation and authorities and a variety of external and internal drivers that include the President's Ocean Action Plan, the recommendations of the Coral Reef Task Force, the information needs of Bureaus in the Department of Interior, the USGS Bureau Science Strategy (USGS 2007) and the formal plans of several USGS Programs. To achieve this Plan's desired outcomes will require increased funding and more effective coordination and collaboration among USGS managers and scientists within a national and international framework of partnerships in coral ecosystem science.
Larsson, Agneta; Gard, Gunvor
2003-09-01
Employers in Sweden are by law responsible for planning and controlling the working environment situation in their companies and for ensuring that any need for rehabilitation is noted as soon as possible and that action is taken. This includes developing a plan for rehabilitation. The aim of this study is to describe employers' experiences of the work rehabilitation planning process at the workplace, and how it can be improved with a focus on quality and cost-effectiveness. Qualitative interviews were performed with 10 employers of employee/s that had participated in vocational rehabilitation at a rehabilitation center in the North of Sweden. The results showed that employers were interested in detecting work rehabilitation needs and in taking action early. Rehabilitation at the workplace could be improved by development of routines, improved work relations and work technique, and environment in-service training at the workplace. Prevention was perceived as a prerequisite for a good result of rehabilitation. Attention to social and geographic conditions is needed. Organizational and financial limitations exist.
From action planning and plan enactment to fruit consumption: moderated mediation effects.
Kasten, Stefanie; van Osch, Liesbeth; Eggers, Sander Matthijs; de Vries, Hein
2017-10-23
Sufficient fruit consumption is beneficial for a healthy live. While many Dutch adults intent to eat the recommended amount of fruit, only 5-10% of the population actually adheres to the recommendation. One mechanism that can help to narrow this gap between intention and actual fruit consumption is action planning. However, action planning is only assumed to be effective if plans are enacted. This study assessed which action plans are made and enacted, and further aimed to investigate two main hypotheses: 1. the effect of action planning (at T1) on fruit consumption (at T2) is mediated by plan enactment (at T3); 2. positive intentions (2a), high self-efficacy (2b) and a strong habit to eat fruit (2c) enhance the mediation of plan enactment, whereas a strong habit to eat snacks (2d) hinders the mediation of plan enactment. This study was a self-reported longitudinal online survey study. A total of 428 participants filled in a survey, measuring demographic factors (e.g. gender, age, education level), several socio-cognitive constructs (i.e. attitudes, self-efficacy, habit, action planning, plan enactment), and fruit consumption, at three points in time (baseline, after 1 month, and after 3 months). Mediation and moderated mediation analyses were used to investigate the planning-plan enactment- fruit consumption relationship. Up to 70% of the participants reported to have enacted their T1 action plans at T2. Action planning on fruit consumption was fully mediated by plan enactment (Hypothesis 1). All four proposed moderators (i.e. intention, self-efficacy, habit to consume fruit, and habit to consume snacks) significantly influenced the mediation (Hypotheses 2a-2d). Mediation of plan enactment was only present with high levels of intention, high levels of self-efficacy, strong habits to eat fruit, and weak habits to eat snacks. The study suggests the importance of plan enactment for fruit consumption. Furthermore, it emphasizes the necessity of facilitating factors. High levels of intention, self-efficacy and a strong habit to consume fruit clearly aid the enactment of action plans. This suggests that when these factors are moderately low, plan enactment may fail and thus an intervention may require first steps to foster these moderating factors.
Climate Action Planning Tool | NREL
NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to
36 CFR 906.4 - Formulation of affirmative action plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CORPORATION AFFIRMATIVE ACTION POLICY AND PROCEDURE Development Program § 906.4 Formulation of affirmative action plan. (a) The developer, in formulating the Affirmative Action Plan, should consider all phases of... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Formulation of affirmative...
75 FR 2466 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
...-0032, Notice No. 4] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Notice of public hearing and... collisions, on average, over the past three years, to develop State highway-rail grade crossing action plans...
75 FR 36551 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...
29 CFR 1917.30 - Emergency action plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emergency action and for reaction time for safe escape of employees from the workplace or the immediate work... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1917.30 Section 1917.30 Labor... (CONTINUED) MARINE TERMINALS Marine Terminal Operations § 1917.30 Emergency action plans. (a) Emergency...
2012-12-01
order, SPMAGTF–12.1 con - ducted staff planning and developed several courses of action in support of anticipated scenarios. Though the need for U.S...response capability is limited to providing evacuation con - trol center support for a noncombatant evacuation, and security in support to foreign...Vision and Strategy 2025, The Long War operational employment con - cept, and AfriCom Theater Campaign Plan (May 2009) and submitted it to Headquarters
Noncommunicable Disease Prevention and Control in Mongolia: A Policy Analysis.
Chimeddamba, Oyun; Peeters, Anna; Walls, Helen L; Joyce, Catherine
2015-07-14
Noncommunicable diseases (NCDs) are the major global cause of morbidity and mortality. In Mongolia, a number of health policies have been developed targeting the prevention and control of noncommunicable diseases. This paper aimed to evaluate the extent to which NCD-related policies introduced in Mongolia align with the World Health Organization (WHO) 2008-2013 Action Plan for the Global Strategy for the Prevention and Control of NCDs. We conducted a review of policy documents introduced by the Government of Mongolia from 2000 to 2013. A literature review, internet-based search, and expert consultation identified the policy documents. Information was extracted from the documents using a matrix, mapping each document against the six objectives of the WHO 2008-2013 Action Plan for the Global Strategy for the Prevention and Control of NCDs and five dimensions: data source, aim and objectives of document, coverage of conditions, coverage of risk factors and implementation plan. 45 NCD-related policies were identified. Prevention and control of the common NCDs and their major risk factors as described by WHO were widely addressed, and policies aligned well with the objectives of the WHO 2008-2013 Action Plan for the Global Strategy for the Prevention and Control of NCDs. Many documents included explicit implementation or monitoring frameworks. It appears that each objective of the WHO 2008-2013 NCD Action Plan was well addressed. Specific areas less well and/or not addressed were chronic respiratory disease, physical activity guidelines and dietary standards. The Mongolian Government response to the emerging burden of NCDs is a population-based public health approach that includes a national multisectoral framework and integration of NCD prevention and control policies into national health policies. Our findings suggest gaps in addressing chronic respiratory disease, physical activity guidelines, specific food policy actions restricting sales advertising of food products, and a lack of funding specifically supporting NCD research. The neglect of these areas may hamper addressing the NCD burden, and needs immediate action. Future research should explore the effectiveness of national NCD policies and the extent to which the policies are implemented in practice.