75 FR 50753 - Combined Notice of Filings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-17
... 138th Revised Sheet 9 to FERC Gas Tariff, Fourth Revised Volume 1, to be effective 8/1/10. Filed Date... waiver of the provisions of Section 12.5, to be effective 9/1/10. Filed Date: 07/30/2010 Accession Number..., August 16, 2010. Docket Numbers: RP10-1038-000. Applicants: Gulf South Pipeline Company, LP. Description...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-25
... Department of Environmental Protection, (WVDEP), Division of Water and Waste Management, 601 57th Street SE...] West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY... for final authorization of revisions to its hazardous waste program under the Resource Conservation...
77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...
40 CFR 179.125 - Judicial review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Judicial review. 179.125 Section 179... EVIDENTIARY PUBLIC HEARING Judicial Review § 179.125 Judicial review. (a) The Administrator's final decision... judicial review within the period ending on the 60th day after the date of the publication of the order...
75 FR 62458 - Revision of Class E Airspace; Tanana, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
...-0588 Airspace Docket No. 10-AAL-16] Revision of Class E Airspace; Tanana, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at Tanana, AK. The... West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907) 271-2850...
76 FR 66178 - Revision of Class E Airspace; Umiat, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
...-0750; Airspace Docket No. 11-AAL-08] Revision of Class E Airspace; Umiat, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at Umiat, AK, due to...-538G, Federal Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone...
75 FR 32271 - Revision of Class E Airspace; Nenana, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
...-0081; Airspace Docket No. 10-AAL-3] Revision of Class E Airspace; Nenana, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at Nenana, AK, to..., Federal Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number...
75 FR 12679 - Revision of Class E Airspace; Iliamna, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
...-1036; Airspace Docket No. 09-AAL-17] Revision of Class E Airspace; Iliamna, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at Iliamna, AK, to..., Federal Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number...
75 FR 33165 - Revision of Class E Airspace; Galena, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
...-0299; Airspace Docket No. 10-AAL-9] Revision of Class E Airspace; Galena, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final Rule. SUMMARY: This action revises Class E airspace at Galena, AK, to...-538G, Federal Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone...
Code of Federal Regulations, 2010 CFR
2010-07-01
... SIP revisions relating to budgets for SO2 and NOX emissions. 51.125 Section 51.125 Protection of... SIP revisions relating to budgets for SO2 and NOX emissions. (a) For its transport SIP revision under § 51.123 and/or 51.124, each State must submit to EPA SO2 and/or NOX emissions data as described in...
Na, Songqing; Ma, Yanfei; Zhao, Jingyong; Schmidt, Clint; Zeng, Qing Q.; Chandrasekhar, Srinivasan; Chin, William W.; Nagpal, Sunil
2011-01-01
Vitamin D receptor (VDR) agonists are currently the agents of choice for the treatment of psoriasis, a skin inflammatory indication that is believed to involve an autoimmune component. 1,25-dihydroxyvitamin D3 [1,25-(OH)2D3], the biologically active metabolite of vitamin D, has shown efficacy in animal autoimmune disease models of multiple sclerosis, rheumatoid arthritis, inflammatory bowel disease, and type I diabetes. However, the side effect of 1,25-(OH)2D3 and its synthetic secosteroidal analogs is hypercalcemia, which is a major impediment in their clinical development for autoimmune diseases. Hypercalcemia develops as a result of the action of VDR agonists on the intestine. Here, we describe the identification of a VDR modulator (VDRM) compound A that was transcriptionally less active in intestinal cells and as a result exhibited less calcemic activity in vivo than 1,25-(OH)2D3. Cytokine analysis indicated that the VDRM not only modulated the T-helper cell balance from Th1 to Th2 effector function but also inhibited Th17 differentiation. Finally, we demonstrate that the oral administration of compound A inhibited the induction and progress of experimental autoimmune encephalomyelitis in mice without causing hypercalcemia. PMID:21318047
76 FR 72128 - Airworthiness Directives; Thielert Aircraft Engines GmbH (TAE) Reciprocating Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... Service Information We reviewed TAE Service Bulletin (SB) No. TM TAE 125-1007 P1, Revision 3, dated...-E002801. Use paragraphs A. through B. of TAE Service Bulletin (SB) No. TM TAE 125-1007 P1, Revision 3, dated October 17, 2011, or SB No. TM TAE 125-1007 P1, Revision 2, dated April 29, 2009, to do the...
2014-08-06
This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2015 as required by the statute. This final rule finalizes a policy to collect data on the amount and mode (that is, Individual, Concurrent, Group, and Co-Treatment) of therapy provided in the IRF setting according to therapy discipline, revises the list of diagnosis and impairment group codes that presumptively meet the "60 percent rule'' compliance criteria, provides a way for IRFs to indicate on the Inpatient Rehabilitation Facility-Patient Assessment Instrument (IRF-PAI) form whether the prior treatment and severity requirements have been met for arthritis cases to presumptively meet the "60 percent rule'' compliance criteria, and revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP). This rule also delays the effective date for the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that were finalized in FY 2014 IRF PPS final rule and adopts the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that are finalized in this rule. This final rule also addresses the implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), for the IRF prospective payment system (PPS), which will be effective when ICD-10-CM becomes the required medical data code set for use on Medicare claims and IRF-PAI submissions.
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis begins to disappear into the darkness as it rolls to a stop on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis disappears into the darkness as it rolls to a stop on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis begins to disappear into the darkness as it rolls to a stop on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis disappears into the darkness as it rolls to a stop on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
14 CFR 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Revision of budget and program plans. 1260....125 Revision of budget and program plans. (a) The budget plan is the financial expression of the... required to report deviations from budget and program plans, and request prior approvals for budget and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
...This final rule adopts the standard for a national unique health plan identifier (HPID) and establishes requirements for the implementation of the HPID. In addition, it adopts a data element that will serve as an other entity identifier (OEID), or an identifier for entities that are not health plans, health care providers, or individuals, but that need to be identified in standard transactions. This final rule also specifies the circumstances under which an organization covered health care provider must require certain noncovered individual health care providers who are prescribers to obtain and disclose a National Provider Identifier (NPI). Lastly, this final rule changes the compliance date for the International Classification of Diseases, 10th Revision, Clinical Modification (ICD- 10-CM) for diagnosis coding, including the Official ICD-10-CM Guidelines for Coding and Reporting, and the International Classification of Diseases, 10th Revision, Procedure Coding System (ICD-10-PCS) for inpatient hospital procedure coding, including the Official ICD-10-PCS Guidelines for Coding and Reporting, from October 1, 2013 to October 1, 2014.
2011-07-21
CAPE CANAVERAL, Fla. -- Only space shuttle Atlantis' drag chute is visible as the spacecraft disappears into the darkness and rolls to a stop on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson has the final fitting of his launch and entry suit. Swanson is making his second shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
Sepulveda, Esteban; Franco, José G; Trzepacz, Paula T; Gaviria, Ana M; Viñuelas, Eva; Palma, José; Ferré, Gisela; Grau, Imma; Vilella, Elisabet
2015-01-01
Delirium diagnosis in elderly is often complicated by underlying dementia. We evaluated performance of the Delirium Rating Scale-Revised-98 (DRS-R98) in patients with high dementia prevalence and also assessed concordance among past and current diagnostic criteria for delirium. Cross-sectional analysis of newly admitted patients to a skilled nursing facility over 6 months, who were rated within 24-48 hours after admission. Interview for Diagnostic and Statistical Manual of Mental Disorders, 3rd edition-R (DSM)-III-R, DSM-IV, DSM-5, and International Classification of Diseases 10th edition delirium ratings, administration of the DRS-R98, and assessment of dementia using the Informant Questionnaire on Cognitive Decline in the Elderly were independently performed by 3 researchers. Discriminant analyses (receiver operating characteristics curves) were used to study DRS-R98 accuracy against different diagnostic criteria. Hanley and McNeil test compared the area under the curve for DRS-R98's discriminant performance for all diagnostic criteria. Dementia was present in 85/125 (68.0%) subjects, and 36/125 (28.8%) met criteria for delirium by at least 1 classification system, whereas only 19/36 (52.8%) did by all. DSM-III-R diagnosed the most as delirious (27.2%), followed by DSM-5 (24.8%), DSM-IV-TR (22.4%), and International Classification of Diseases 10th edition (16%). DRS-R98 had the highest AUC when discriminating DSM-III-R delirium (92.9%), followed by DSM-IV (92.4%), DSM-5 (91%), and International Classification of Diseases 10th edition (90.5%), without statistical differences among them. The best DRS-R98 cutoff score was ≥14.5 for all diagnostic systems except International Classification of Diseases 10th edition (≥15.5). There is a low concordance across diagnostic systems for identification of delirium. The DRS-R98 performs well despite differences across classification systems perhaps because it broadly assesses phenomenology, even in this population with a high prevalence of dementia. Copyright © 2015 The Academy of Psychosomatic Medicine. Published by Elsevier Inc. All rights reserved.
Zehn, Dietmar; Bevan, Michael J.; Fink, Pamela J.
2009-01-01
CD4+ T cells respond to peripheral endogenous superantigen stimulation by undergoing deletion or TCR revision. The latter involves RAG re-expression, TCR gene rearrangement, and expression of a novel TCR. TCR-revised T cells are functional and express a diverse TCR repertoire. Because TCR revision harbors the potential to create self-reactivity, it is important to explore whether T cells known to be self-reactive (regulatory T cells) or those involved in autoimmunity (Th17 cells) arise from TCR revision. Interestingly, we observed that Foxp3+ cells are excluded from revising their TCR and that only a small fraction of postrevision cells expresses Foxp3. In contrast, Th17 cells are 20 times more frequent among revised than among C57BL/6 CD4+ T cells, indicating that postrevision cells are biased toward the Th17 lineage. The link between Th17 differentiation and TCR revision might be highly relevant to the role of Th17 cells in promoting autoimmunity. PMID:17947636
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it touches down on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it touches down on Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Vapor trails follow space shuttle Atlantis as it approaches Runway 15 on the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida for the final time. A vapor trail, known as a contrail, is a cloud of water vapor that condenses and freezes around the small particles in aircraft exhaust. Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. It also was the final mission for the shuttle program. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information on the space shuttle era, visit www.nasa.gov/mission_pages/shuttle/flyout. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold gets help from a suit technician in the final fitting of his launch and entry suit. Arnold will be making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips has a final fitting of his launch and entry suit and the helmet. Phillips is making his third shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
2009-03-10
CAPE CANAVERAL, Fla. – – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Joseph Acaba has a final fitting of his launch and entry suit. Acaba is making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold signals he is ready for launch during the final fitting of his launch and entry suit. Arnold is making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
Code of Federal Regulations, 2014 CFR
2014-07-01
... modification by supplying to EPA the results of studies and monitoring performed in accordance with § 125.63..., regulations (44 FR 34784) may revise their applications one time following a tentative decision to propose...)(2)(i); and (2) Other applicants may revise their applications one time following a tentative...
Code of Federal Regulations, 2012 CFR
2012-07-01
... modification by supplying to EPA the results of studies and monitoring performed in accordance with § 125.63..., regulations (44 FR 34784) may revise their applications one time following a tentative decision to propose...)(2)(i); and (2) Other applicants may revise their applications one time following a tentative...
Code of Federal Regulations, 2013 CFR
2013-07-01
... modification by supplying to EPA the results of studies and monitoring performed in accordance with § 125.63..., regulations (44 FR 34784) may revise their applications one time following a tentative decision to propose...)(2)(i); and (2) Other applicants may revise their applications one time following a tentative...
Code of Federal Regulations, 2010 CFR
2010-07-01
... modification by supplying to EPA the results of studies and monitoring performed in accordance with § 125.63..., regulations (44 FR 34784) may revise their applications one time following a tentative decision to propose...)(2)(i); and (2) Other applicants may revise their applications one time following a tentative...
Code of Federal Regulations, 2011 CFR
2011-07-01
... modification by supplying to EPA the results of studies and monitoring performed in accordance with § 125.63..., regulations (44 FR 34784) may revise their applications one time following a tentative decision to propose...)(2)(i); and (2) Other applicants may revise their applications one time following a tentative...
Chemical Carcinogen (Hydrazine et al.) Induced Carcinogenesis of Human Diploid Fibroblasts in vitro.
1983-12-29
Comprehensive Cancer Center [ The Ohio State University 410 W. 12th Avenue ’,I Columbus, Ohio 43210 II 2-". 23 May 1984 V [ Final Report for Period 1...43210 George E. Milo I.’, Professor Physiological Chemistry and Comprehensive Cancer Center 410 W. 12th Ave. Suite 302 4’ 4. -4...Committee on Care and Use of Laboratory Animals, DHHS Publication No. NIH 78-23, revised 1982. George E. Milo, Ph.D. Comprehensive Cancer Center The Ohio
77 FR 37326 - Safety Zone; Grand Hotel 125th Anniversary Fireworks Celebration, Mackinaw Island, MI
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
... National Technology Transfer and Advancement Act (NTTAA) (15 U.S.C. 272 note) directs agencies to use... Rulemaking A. Regulatory History and Information The Coast Guard is issuing this temporary final rule without.... Assistance for Small Entities Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act...
2009-03-15
CAPE CANAVERAL, Fla. – Looking like a sun riding a column of smoke, space shuttle Discovery hurtles into the evening sky on the STS-119 mission. Liftoff was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Fletch Hildreth
Alvarez-Díaz, Jorge Alberto
2008-01-01
Within the framework of the 125 anniversary of the birth of Franz Kafka we discuss his work as a patient affected by tuberculosis. This essay outlines a review of Kafka as a writer and explains the meaning of the term "Kafkaesque". We put forward a commentary on the ethics expressed in a short story entitled A country doctor. An interpretation of Kafka must involve the notion of responsibility, a theological concept that is then followed by the legal context. Finally, Kafka embraces an ethical approach expressed in his work.
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata has a final fitting of his launch and entry suit. Wakata will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-188 (21 July 2011) --- Ribbons of steam and smoke trail space shuttle Atlantis as it touches down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-186 (21 July 2011) --- Xenon lights cast a halo of light on space shuttle Atlantis as the spacecraft approaches Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-171 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-245 (21 July 2011) --- Xenon lights guide space shuttle Atlantis as it lands on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-168 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-251 (21 July 2011) --- Xenon lights guide space shuttle Atlantis as it lands on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-174 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-185 (21 July 2011) --- Xenon lights cast a halo of light on space shuttle Atlantis as the spacecraft approaches Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-173 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-247 (21 July 2011) --- Xenon lights guide space shuttle Atlantis as it lands on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-250 (21 July 2011) --- Xenon lights guide space shuttle Atlantis as it lands on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-172 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-169 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-170 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-248 (21 July 2011) --- Xenon lights guide space shuttle Atlantis as it lands on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-167 (21 July 2011) --- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-246 (21 July 2011) --- Xenon lights guide space shuttle Atlantis as it lands on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
Code of Federal Regulations, 2013 CFR
2008-01-01
... shall have the date of the last revision and revision number on each revised page. The manual must... command before, during, and after completion of a flight; (g) Procedures to be followed by the pilot in...
Code of Federal Regulations, 2014 CFR
2005-01-01
... shall have the date of the last revision and revision number on each revised page. The manual must... command before, during, and after completion of a flight; (g) Procedures to be followed by the pilot in...
Code of Federal Regulations, 2011 CFR
1997-01-01
... manual shall have the date of the last revision and revision number on each revised page. The manual must... command before, during, and after completion of a flight; (g) Procedures to be followed by the pilot in...
NASA Astrophysics Data System (ADS)
Bech, J.; Rustullet, J.; Tume, P.; Roca, N.; Tobias, F. J.; Garrigó, J.; Reverter, F.; Sánchez, P.
2012-04-01
The aim of this study is to estimate the concentrations and vertical distributions of Th, Ce, Y, and Zr in eleven Alfisol pedons from the NE Garraf Coastal massif (Catalonia, NE Spain). These soils were developed mainly on Mesozoic limestones. The concentrations were determined by XRF and the results were then compared to soil properties (pH, organic carbon content, CaCO3, particle size distribution and Fe forms: total iron, Fet, dithionite-extractable iron, Fed and oxalate-extractable iron,Feo). The range of Th values is: min 3 mgkg-1, max 16 mgkg-1, mean 10.4 mgkg-1 and median 11 mgkg-1. The range of Ce values is: min 22 mgkg-1, max 116 mgkg-1, mean 73.9 mgkg-1 and median 76 mgkg-1. The range of Y values is: min 10 mgkg-1, max 43 mgkg-1, mean 27.5 mgkg-1 and median 27 mgkg-1. The range of Zr values is: min 101 mgkg-1, max 418 mgkg-1, mean 253 mgkg-1 and median 252 mgkg-1. The Th concentrations obtained are similar to world soil and NASC values. These concentration data of Th, Ce, Y and Zr were correlated with each other and with the soil properties. Th correlates positively with Ce (0.95), Y (0.92), Zr (0.80), Fet (0.75), Fed (0.85) and Fed-Feo (0.85), clay% (0.55) and silt% (0.31) and negatively with sand% and CaCO3. The correlations do not indicate any significant relationship between Th and organic carbon or Feo. The ranking of the horizons by Th concentration is: BC hor. (12.5 mgkg-1), Bt hor. (11 mgkg-1), A hor. (10.1 mgkg-1) and finally C horizons (7.2 mgkg-1). The ranking of the Alfisols by Th concentration, taking into account the litology is: those derived from limestones (14.5 mgkg-1), those derived from schists (12.5 mgkg-1), those originated over dolomites (11.8 mgkg-1), those developed over Pleistocene colluvium (9.2 mgkg-1) and finally those originated over Keuper marls (6 mgkg-1).
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-26
..., revised, or implemented on or after October 1, 1995, unless it displays a currently valid OMB control... Building, Room 10235, 725 17th Street NW., Washington, DC 20503. Final approval under OMB delegated... response: FR 2028A, 3.6 hours; FR 2028B, 1.4 hours; and FR 2028S, 0.1 hours. Number of respondents: FR...
Beime, Beate; Deutsch, Cornelia; Krüger, Ralf; Zimmermann, Erik; Bramlage, Peter
2016-12-01
The aim of the present study was to validate the blood pressure (BP) measurement device Erkameter 125 PRO according to the International Protocol revision 2010 of the European Society of Hypertension (ESH-IP2). In 33 patients aged 32-79 years, BP measurements were performed alternately using the Erkameter 125 PRO and the reference mercury sphygmomanometer according to ESH-IP revision 2010. For the analysis, a total of 99 comparisons were included. All absolute differences between the test device and the reference were within 10 mmHg for systolic blood pressure (SBP), and all except one for diastolic blood pressure (DBP). A total of 93 out of 99 comparisons for SBP showed an absolute difference within 5 mmHg and 92 out of 99 for DBP. The mean±SD difference between the Erkameter 125 PRO and the standard reference was -0.5±3.5 mmHg for SBP and 0.5±3.5 mmHg for DBP. As to part 2 of ESH-IP 2010, all patients had a minimum of two out of three measurements within 5 mmHg difference for SBP and 31 out of 33 patients for DBP. The Erkameter 125 PRO fulfilled the requirements of parts 1 and 2 of the ESH-IP revision 2010 and can be recommended for office BP measurements in adults.
2009-03-10
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata puts on his helmet as part of the final fitting of his launch and entry suit. Wakata is making his third shuttle flight. He will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned on Runway 15 at the Shuttle Landing Facility reveal space shuttle Atlantis as it nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered in the Raffaello multi-purpose logistics module more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 is the final mission in the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Chuck Tintera
2011-07-21
CAPE CANAVERAL, Fla. -- Backlit by the xenon lights on Runway 15 at the Shuttle Landing Facility, space shuttle Atlantis nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Chad Baumer
2011-07-21
CAPE CANAVERAL, Fla. -- Backlit by the xenon lights on Runway 15 at the Shuttle Landing Facility, space shuttle Atlantis nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Chad Baumer
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-166 (21 July 2011) --- Xenon lights illuminate space shuttle Atlantis' unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned on Runway 15 at the Shuttle Landing Facility reveal space shuttle Atlantis as it touches down for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered in the Raffaello multi-purpose logistics module more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 is the final mission in the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Rusty Backer
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned on Runway 15 at the Shuttle Landing Facility reveal space shuttle Atlantis as it nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Chad Baumer
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-164 (21 July 2011) --- Xenon lights illuminate space shuttle Atlantis' unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-165 (21 July 2011) --- Xenon lights illuminate space shuttle Atlantis' unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
2011-07-21
CAPE CANAVERAL, Fla. -- Backlit by the xenon lights on Runway 15 at the Shuttle Landing Facility, space shuttle Atlantis nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kenny Allen
Hydration of Acetylene: A 125th Anniversary
ERIC Educational Resources Information Center
Ponomarev, Dmitry A.; Shevchenko, Sergey M.
2007-01-01
The year 2006 is the 125th anniversary of a chemical reaction, the discovery of which by Mikhail Kucherov had a profound effect on the development of industrial chemistry in the 19-20th centuries. This was the hydration of alkynes catalyzed by mercury ions that made possible industrial production of acetaldehyde from acetylene. Historical…
2009-03-28
CAPE CANAVERAL, Fla. – NASA Deputy Manager of Space Shuttle Program LeRoy Cain and NASA Associate Administrator for Space Operations Bill Gerstenmaier inspect the thermal protection system tile beneath space shuttle Discovery following touchdown on Runway 15 at NASA's Kennedy Space Center in Florida. Discovery’s landing completed the 13-day, 5.3-million mile journey on the STS-119 mission to the International Space Station. Main gear touchdown was at 3:13:17 p.m. EDT. Nose gear touchdown was at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. Discovery delivered the final pair of large power-generating solar array wings and the S6 truss segment. The mission was the 28th flight to the station, the 36th flight of Discovery and the 125th in the Space Shuttle Program, as well as the 70th landing at Kennedy. Photo credit: NASA/Kim Shiflett
2009-03-28
CAPE CANAVERAL, Fla. – STS-119 Commander Lee Archambault shakes hands with NASA Acting Administrator Chris Scolese as NASA Deputy Associate Administrator Charles Scales, left, also prepares to welcome him home. Pilot Tony Antonelli approaches the group, at right. Space shuttle Discovery’s landing completed the 13-day, 5.3-million mile journey of the STS-119 mission to the International Space Station. Main gear touchdown was at 3:13:17 p.m. EDT. Nose gear touchdown was at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. Discovery delivered the final pair of large power-generating solar array wings and the S6 truss segment. The mission was the 28th flight to the station, the 36th flight of Discovery and the 125th in the Space Shuttle Program, as well as the 70th landing at Kennedy. Photo credit: NASA/Kim Shiflett
2017-08-03
This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rodriguez, M., E-mail: manuel.rodriguez@rmp.uhn.ca; Rogers, D. W. O.
Purpose: To more accurately account for the relative intrinsic energy dependence and relative absorbed-dose energy dependence of TLDs when used to measure dose rate constants (DRCs) for {sup 125}I and {sup 103}Pd brachytherapy seeds, to thereby establish revised “measured values” for all seeds and compare the revised values with Monte Carlo and consensus values. Methods: The relative absorbed-dose energy dependence, f{sup rel}, for TLDs and the phantom correction, P{sub phant}, are calculated for {sup 125}I and {sup 103}Pd seeds using the EGSnrc BrachyDose and DOSXYZnrc codes. The original energy dependence and phantom corrections applied to DRC measurements are replaced bymore » calculated (f{sup rel}){sup −1} and P{sub phant} values for 24 different seed models. By comparing the modified measured DRCs to the MC values, an appropriate relative intrinsic energy dependence, k{sub bq}{sup rel}, is determined. The new P{sub phant} values and relative absorbed-dose sensitivities, S{sub AD}{sup rel}, calculated as the product of (f{sup rel}){sup −1} and (k{sub bq}{sup rel}){sup −1}, are used to individually revise the measured DRCs for comparison with Monte Carlo calculated values and TG-43U1 or TG-43U1S1 consensus values. Results: In general, f{sup rel} is sensitive to the energy spectra and models of the brachytherapy seeds. Values may vary up to 8.4% among {sup 125}I and {sup 103}Pd seed models and common TLD shapes. P{sub phant} values depend primarily on the isotope used. Deduced (k{sub bq}{sup rel}){sup −1} values are 1.074 ± 0.015 and 1.084 ± 0.026 for {sup 125}I and {sup 103}Pd seeds, respectively. For (1 mm){sup 3} chips, this implies an overall absorbed-dose sensitivity relative to {sup 60}Co or 6 MV calibrations of 1.51 ± 1% and 1.47 ± 2% for {sup 125}I and {sup 103}Pd seeds, respectively, as opposed to the widely used value of 1.41. Values of P{sub phant} calculated here have much lower statistical uncertainties than literature values, but systematic uncertainties from density and composition uncertainties are significant. Using these revised values with the literature’s DRC measurements, the average discrepancies between revised measured values and Monte Carlo values are 1.2% and 0.2% for {sup 125}I and {sup 103}Pd seeds, respectively, compared to average discrepancies for the original measured values of 4.8%. On average, the revised measured values are 4.3% and 5.9% lower than the original measured values for {sup 103}Pd and {sup 125}I seeds, respectively. The average of revised DRCs and Monte Carlo values is 3.8% and 2.8% lower for {sup 125}I and {sup 103}Pd seeds, respectively, than the consensus values in TG-43U1 or TG-43U1S1. Conclusions: This work shows that f{sup rel} is TLD shape and seed model dependent suggesting a need to update the generalized energy response dependence, i.e., relative absorbed-dose sensitivity, measured 25 years ago and applied often to DRC measurements of {sup 125}I and {sup 103}Pd brachytherapy seeds. The intrinsic energy dependence for LiF TLDs deduced here is consistent with previous dosimetry studies and emphasizes the need to revise the DRC consensus values reported by TG-43U1 or TG-43U1S1.« less
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons light the way home for space shuttle Atlantis at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown on the Shuttle Landing Facility's Runway 15 was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph
The Final Landing of STS-135 Atlantis
2011-07-21
STS135-S-241 (21 July 2011) --- Xenon lights cast a halo of light on space shuttle Atlantis as the spacecraft nears touchdown for the last time on Runway 15 at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. (EDT) on July 21, 2011, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. Onboard are NASA astronauts Chris Ferguson, STS-135 commander; Doug Hurley, pilot; Sandy Magnus and Rex Walheim, both mission specialists. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. Photo credit: NASA
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons light the way home for space shuttle Atlantis at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown on the Shuttle Landing Facility's Runway 15 was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights guide space shuttle Atlantis down on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Frank Michaux
STS-125 Space Shuttle Atlantis Documentation
2009-06-01
Multiple camera documentation of STS-125 Atlantis landing and turnaround at Nasa Dryden Flight Research Center. Highlights: • 5th and final HST servicing mission • IMAX camera used to document mission highlights • 5 EVA’s • Orbital Altitude: 338.67 statute miles • Orbits: 197 (landed on orbit 198) • Duration: 12D 21H 37M 18S • Traveled: 5.28 million statute miles • 1st Shuttle landing on the refurbished EDW concrete runway • Orbiter Turnaround: 7 Days Crew: CDR: Scott Altman PLT: Gregory “Greg” Johnson MS1/EV4: Michael “Mike” Good MS2: Megan MacArthur MS3/EV1: John Grunsfeld MS4/EV3: Michael Massamino MS5/EV2: Andrew “Drew” Feustel
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-01-05
This report presents the findings of Remedial Investigations and Feasibility Studies at sites located at the Barter Island radar installation in northern Alaska. The sites were characterized based on sampling and analyses conducted during Remedial Investigation activities performed during August and September 1993.
2011-07-21
CAPE CANAVERAL, Fla. -- Backlit by the xenon lights on Runway 15 at the Shuttle Landing Facility, space shuttle Atlantis nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. It was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, xenon lights positioned at the end of Runway 15 illuminate the Shuttle Landing Facility for space shuttle Atlantis' final return from space. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
2011-07-21
CAPE CANAVERAL, Fla. -- Backlit by the xenon lights on Runway 15 at the Shuttle Landing Facility, space shuttle Atlantis nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. It was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, xenon lights positioned at the end of Runway 15 illuminate the Shuttle Landing Facility for space shuttle Atlantis' final return from space. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
2011-07-21
CAPE CANAVERAL, Fla. -- At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, the drag chute trailing space shuttle Atlantis is illuminated by the xenon lights on Runway 15 as the shuttle lands for the final time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kenny Allen
2011-07-21
CAPE CANAVERAL, Fla. -- Backlit by the xenon lights on Runway 15 at the Shuttle Landing Facility, space shuttle Atlantis nears touchdown for the final time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. It was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph and Kevin O'Connell
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zehtabian, M; Zaker, N; Sina, S
2015-06-15
Purpose: Different versions of MCNP code are widely used for dosimetry purposes. The purpose of this study is to compare different versions of the MCNP codes in dosimetric evaluation of different brachytherapy sources. Methods: The TG-43 parameters such as dose rate constant, radial dose function, and anisotropy function of different brachytherapy sources, i.e. Pd-103, I-125, Ir-192, and Cs-137 were calculated in water phantom. The results obtained by three versions of Monte Carlo codes (MCNP4C, MCNPX, MCNP5) were compared for low and high energy brachytherapy sources. Then the cross section library of MCNP4C code was changed to ENDF/B-VI release 8 whichmore » is used in MCNP5 and MCNPX codes. Finally, the TG-43 parameters obtained using the MCNP4C-revised code, were compared with other codes. Results: The results of these investigations indicate that for high energy sources, the differences in TG-43 parameters between the codes are less than 1% for Ir-192 and less than 0.5% for Cs-137. However for low energy sources like I-125 and Pd-103, large discrepancies are observed in the g(r) values obtained by MCNP4C and the two other codes. The differences between g(r) values calculated using MCNP4C and MCNP5 at the distance of 6cm were found to be about 17% and 28% for I-125 and Pd-103 respectively. The results obtained with MCNP4C-revised and MCNPX were similar. However, the maximum difference between the results obtained with the MCNP5 and MCNP4C-revised codes was 2% at 6cm. Conclusion: The results indicate that using MCNP4C code for dosimetry of low energy brachytherapy sources can cause large errors in the results. Therefore it is recommended not to use this code for low energy sources, unless its cross section library is changed. Since the results obtained with MCNP4C-revised and MCNPX were similar, it is concluded that the difference between MCNP4C and MCNPX is their cross section libraries.« less
2009-03-28
CAPE CANAVERAL, Fla. – With space shuttle Discovery as backdrop on Runway 15 at NASA's Kennedy Space Center in Florida, members of the STS-119 crew address the workers and guests on hand to welcome them home following their 13-day, 5.3-million mile journey on the STS-119 mission to the International Space Station. From left are Commander Lee Archambault, Pilot Tony Antonelli and Mission Specialists Joseph Acaba, Steve Swanson, Richard Arnold and John Phillips. Main gear touchdown was at 3:13:17 p.m. EDT. Nose gear touchdown was at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. Discovery delivered the final pair of large power-generating solar array wings and the S6 truss segment. The mission was the 28th flight to the station, the 36th flight of Discovery and the 125th in the Space Shuttle Program, as well as the 70th landing at Kennedy. Photo credit: NASA/Kim Shiflett
2009-03-28
CAPE CANAVERAL, Fla. – STS-119 Commander Lee Archambault shakes hands with NASA Deputy Manager of Space Shuttle Program LeRoy Cain (third from left) as Pilot Tony Antonelli, behind him, is greeted by NASA Associate Administrator for Space Operations Bill Gerstenmaier. Shuttle Launch Director Mike Leinbach, left, and Kennedy Space Center Deputy Director Janet Petro also await their turns to welcome the crew home. Space shuttle Discovery’s landing completed the 13-day, 5.3-million mile journey of the STS-119 mission to the International Space Station. Main gear touchdown was at 3:13:17 p.m. EDT. Nose gear touchdown was at 3:13:40 p.m. and wheels stop was at 3:14:45 p.m. Discovery delivered the final pair of large power-generating solar array wings and the S6 truss segment. The mission was the 28th flight to the station, the 36th flight of Discovery and the 125th in the Space Shuttle Program, as well as the 70th landing at Kennedy. Photo credit: NASA/Kim Shiflett
Stoll, Barbara J
2013-10-01
This year is the 125th anniversary of the American Pediatric Society (APS), a time to reflect on the past 125 years of child health and child health research, a time to consider the health of America's children in a social and global context, and a time to consider the future. This paper is a combination of pediatric and APS history and personal story.
2009-03-15
CAPE CANAVERAL, Fla. – As space shuttle Discovery roars toward space after launch from Launch Pad 39A at NASA's Kennedy Space Center in Florida, mach diamonds can be seen beneath the engine nozzles. Blue cones of light, the mach diamonds are a formation of shock waves in the exhaust plume of an aerospace propulsion system. Launch was on time at 7:43 p.m. EDT. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Rusty Backer, George Roberts
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights illuminate space shuttle Atlantis' unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights spotlight space shuttle Atlantis as the spacecraft nears touchdown for the last time on Runway 15 at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kenny Allen
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights create a halo around space shuttle Atlantis as the spacecraft nears touchdown for the last time on Runway 15 at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kenny Allen
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis creates its own xenon light show as in lands on Runway 15 at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered in the Raffaello multi-purpose logistics module more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 is the final mission in the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Chuck Tintera
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights illuminate space shuttle Atlantis' unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights illuminate space shuttle Atlantis' unfurled drag chute as the vehicle rolls to a stop on the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the final. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Jim Grossmann
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons cast a halo of light on space shuttle Atlantis as the spacecraft nears touchdown for the last time on Runway 15 at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kenny Allen
Final Revisions Rule State Budgets and New Unit Set-Asides TSD
This technical support document shows the underlying data and calculations used to quantify the state budget revisions and new unit set-aside revisions made in the final revisions rule, as well as those revisions included in the direct final revisions rule
2016-07-24
60th Medical Group (AMC), Travis AFB, CA INSTITUTIONAL ANIMAL CARE AND USE COMMITTEE (IACUC) FINAL REPORT SUMMARY (Please type all information. Use...TRIENNIAL REVISION DATE: N/A FUNDING SOURCE: HQ USAF SG 1. RECORD OF ANIMAL USAGE: Animal Species: Total # Approved # Used this FY Total # Used to...Restraint Training: non-Live Animal Health Promotion Research: Survival (chronic) Prevention x_ Research: non-Survival (acute) Utilization Mgt. Other
The history of neuromyelitis optica
2013-01-01
The discovery of a novel serum autoantibody (termed NMO-IgG or AQP4-Ab) in a subset of patients in 2004 has revived interest in neuromyelitis optica (NMO). While the history of classical multiple sclerosis has been extensively studied, only little is known about the history of NMO. In the present article, we provide a comprehensive review of the early history of this rare but intriguing syndrome. We trace the origins of the concept of NMO in the 19th century medical literature and follow its evolution throughout the 20th and into the 21st century. Finally, we discuss recent proposals to revise the concept of NMO and explain why there is indeed a need for a more systematic and descriptive nomenclature. PMID:23320783
Proceedings of Military Operations Research Symposia (Index) Volume 3. 31st through 40th inclusive
1980-11-01
Rist Prize, 35th MORS) 35-75 Couch Jr. and William H Newhart Jr), Designing to system performance/cost/effectiveness, 32-9 Benedict Frank C. Tactical...George L (with Creighton W Cook), Design -to- of threat-oriented ordnance for combat. (Rist Prize. cest: fact or fantasy. 32-125 35th MORS) 35-75...1 Cook Creighton IV (with George L Arnold). Design -to- performance in military vehicles. 35-92 cost: fact or fantasy. 32-125 Dixon Thomas E (with Rif
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-24
..., passenger auto and transit travel, and reducing the environmental impacts of transportation for cities and...)--Freeway/Toll Way. This would consist of engineering geometrics similar to Alternative 3 with alterations... engineering geometrics similar to Alternative 3 between SR-14 and approximately 125th St. East. From 125th St...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
... Revisions to Final Response to Petition From New Jersey Regarding SO[bdi2] Emissions From the Portland... final rule. SUMMARY: The EPA issued ``Revisions to Final Response to Petition From New Jersey Regarding... December 22, 2011, we are withdrawing the direct final rule amendments to ``Revisions to Final Response to...
Operative treatment of hip fractures in patients receiving hemodialysis.
Tosun, Bilgehan; Atmaca, Halil; Gok, Umit
2010-11-01
Fifteen hips in 13 patients with hip fracture were treated in patients receiving hemodialysis for chronic renal failure. There were four intertrochanteric and 11 femoral neck fractures. 10 of the 11 femoral neck fractures and one of the four intertrochanteric fractures were treated with cemented bipolar hemiarthroplasty. Two intertrochanteric fractures fixed with sliding compression screws. External fixation was used for stabilization in two patients who had femoral neck and intertrochanteric fractures. Two intertrochanteric fractures that were treated with sliding hip screw showed radiological union postoperatively at the 6th month. Of the 11 hemiarthroplasty, four hips developed aseptic loosening (36%). According to Harris hip score grading system, three (37.5%) poor, two (25%) fair, two (25%) good and one (12.5%) case had excellent outcome in the hemiarthroplasty group. The survival of dialysis patients with a hip fracture is markedly reduced. Initial treatment of hemiarthroplasty allows early mobilization and prevents revision surgery.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
... post- construction hydrostatic test of at least 1.25 times the maximum allowable operating pressure... a post-construction hydrostatic pressure test of at least 125% of the MAOP, and total miles of... approved under OMB control number 2137- 0522 and the hazardous liquid accident report is approved under OMB...
ERIC Educational Resources Information Center
Page, Jennifer, Ed.; Brennan, Patricia, Ed.
The 125th meeting of the Association of Research Libraries (ARL) reviewed the mission statement, goals, and objectives of the Association. Major themes from the review process included the effect of technology on access and preservation; the critical need to develop measures of library effectiveness and performance; and the importance of…
Final June Revisions Rule Significant Contribution Assessment TSD
This Technical Support Document (TSD) presents quantitative assessments of the relationship between the final February revisions to the Transport Rule, the final June revisions rule, and the original analysis conducted for the final Transport Rule.
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned at the end of Runway 15 reveal that the drag chute has deployed behind space shuttle Atlantis to slow the shuttle as it lands for the last time at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned at the end of Runway 15 spotlight space shuttle Atlantis as it nears touchdown for the last time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned at the end of Runway 15 spotlight space shuttle Atlantis as it nears touchdown for the last time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned at the end of Runway 15 spotlight space shuttle Atlantis as it nears touchdown for the last time at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
2011-07-21
CAPE CANAVERAL, Fla. -- Xenon lights positioned at the end of Runway 15 reveal that the drag chute has deployed behind space shuttle Atlantis to slow the shuttle as it lands for the last time at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandy Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. STS-135 also was the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tom Farrar and Tony Gray
14 CFR 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... program plan revisions, in accordance with this section. (c) For nonconstruction awards, recipients shall... recipients to do the following: (1) Incur pre-award costs 90 calendar days prior to award or more than 90 calendar days with the prior approval of NASA. All pre-award costs are incurred at the recipient's risk (i...
14 CFR 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... program plan revisions, in accordance with this section. (c) For nonconstruction awards, recipients shall... recipients to do the following: (1) Incur pre-award costs 90 calendar days prior to award or more than 90 calendar days with the prior approval of NASA. All pre-award costs are incurred at the recipient's risk (i...
14 CFR 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... program plan revisions, in accordance with this section. (c) For nonconstruction awards, recipients shall... recipients to do the following: (1) Incur pre-award costs 90 calendar days prior to award or more than 90 calendar days with the prior approval of NASA. All pre-award costs are incurred at the recipient's risk (i...
ERIC Educational Resources Information Center
Green, Samuel B.; Thompson, Marilyn S.; Levy, Roy; Lo, Wen-Juo
2015-01-01
Traditional parallel analysis (T-PA) estimates the number of factors by sequentially comparing sample eigenvalues with eigenvalues for randomly generated data. Revised parallel analysis (R-PA) sequentially compares the "k"th eigenvalue for sample data to the "k"th eigenvalue for generated data sets, conditioned on"k"-…
76 FR 21832 - Proposed Revision of Class E Airspace; Yakutat, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
...-0244 Airspace Docket No. 11-AAL-05] Proposed Revision of Class E Airspace; Yakutat, AK AGENCY: Federal... proposes to revise Class E airspace at Yakutat, AK. The revision of eight Standard Instrument Approach... Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587. FOR FURTHER INFORMATION CONTACT: Martha...
14 CFR § 1260.125 - Revision of budget and program plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., A-110 and A-122 to allow recipients to do the following: (1) Incur pre-award costs 90 calendar days... reason the recipient does not receive an award or if the award is less than anticipated and inadequate to... construction awards, recipients shall request prior written approval promptly from NASA for budget revisions...
75 FR 13344 - Revised Meeting Time for Citizens Coinage Advisory Committee March 2010 Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... DEPARTMENT OF THE TREASURY United States Mint Revised Meeting Time for Citizens Coinage Advisory...: March 23, 2010. Time: 2:30 p.m. to 5 p.m. Location: 8th Floor Boardroom, United States Mint, 801 9th... call 202-354-7502 for the latest update on meeting time and room location. In accordance with 31 U.S.C...
23 CFR 771.125 - Final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...
High level of CA 125 due to large endometrioma.
Phupong, Vorapong; Chen, Orawan; Ultchaswadi, Pornthip
2004-09-01
CA 125 is a tumor-associated antigen. Its high levels are usually associated with ovarian malignancies, whereas smaller increases in the levels were associated with benign gynecologic conditions. The authors report a high level of CA 125 in a case of large ovarian endometrioma. A 45-year-old nulliparous Thai woman, presented with an increase of her abdominal girth for 7 months. Transabdominal ultrasonogram demonstrated a large ovarian cyst and multiple small leiomyoma uteri, and serum CA 125 level was 1,006 U/ml. The preoperative diagnosis was ovarian cancer with leiomyoma uteri. Exploratory laparotomy was performed. There were a large right ovarian endometrioma, small left ovarian endometrioma and multiple small leiomyoma. Total abdominal hysterectomy and bilateral salpingo-oophorectomy was performed and histopathology confirmed the diagnosis of endometrioma and leiomyoma. The serum CA 125 level declined to non-detectable at the 4th week. She was well at discharge and throughout her 4th week follow-up period Although a very high level of CA 125 is associated with a malignant process, it can also be found in benign conditions such as a large endometrioma. The case emphasizes the association of high levels of CA 125 with benign gynecologic conditions.
Final June Revisions Rule State Budgets and New Unit Set-Asides TSD
This technical support document (TSD) for the final revisions to the Transport Rule shows the underlying data and calculations used to quantify the state budget revisions and new unit set-aside revisions.
ERIC Educational Resources Information Center
Grondhuis, Sabrina Nicole; Mulick, James A.
2013-01-01
A review of hospital records was conducted for children evaluated for autism spectrum disorders who completed both the Leiter International Performance Scale-Revised (Leiter-R) and Stanford-Binet Intelligence Scales, 5th Edition (SB5). Participants were between 3 and 12 years of age. Diagnoses were autistic disorder (n = 26, 55%) and pervasive…
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Commander Lee Archambault puts on his launch-and-entry suit for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Joseph Acaba is helped putting on his boots with his launch-and-entry suit. The crew will be heading for Launch Pad 39A and liftoff of space shuttle Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Pilot Tony Antonelli puts on his launch-and-entry suit for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Joseph Acaba has his helmet fitted on his launch-and-entry suit. The crew will be heading for Launch Pad 39A and liftoff of space shuttle Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata is happy to be suiting up for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-11
CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery is revealed after the rotating service structure has been rolled back. The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
Diagnostics and Treatment of Thyroid Carcinoma.
Jarząb, Barbara; Dedecjus, Marek; Handkiewicz-Junak, Daria; Lange, Dariusz; Lewiński, Andrzej; Nasierowska-Guttmejer, Anna; Ruchała, Marek; Słowińska-Klencka, Dorota; Nauman, Janusz; Adamczewski, Zbigniew; Bagłaj, Maciej; Bałdys-Waligórska, Agata; Barczyński, Marcin; Bednarczuk, Tomasz; Cichocki, Andrzej; Czarniecka, Agnieszka; Czepczyński, Rafał; Gawlik, Aneta; Hubalewska-Dydejczyk, Alicja; Jażdżewski, Krystian; Kamiński, Grzegorz; Karbownik-Lewińska, Małgorzata; Kos-Kudła, Beata; Kułakowski, Andrzej; Kuzdak, Krzysztof; Łącka, Katarzyna; Małecka-Tendera, Ewa; Niedziela, Marek; Pomorski, Lech; Sporny, Stanisław; Stojcev, Zoran; Syrenicz, Anhelli; Włoch, Jan; Krajewska, Jolanta; Szpak-Ulczok, Sylwia; Kalemba, Michal; Buziak-Bereza, Monika
2016-01-01
Revised Guidelines of Polish National Societies Prepared on the initiative of the Polish Group for Endocrine Tumours approved in their final version between November 16th and 28th, 2015 by the Scientific Committee of the V Conference "Thyroid Cancer and other malignancies of endocrine glands" organised between November 14th and 17th, 2015 in Wisla, Poland; called by the following Societies: Polish Endocrine Society, Polish Society of Oncology, Polish Thyroid Association, Polish Society of Pathologists, Society of Polish Surgeons, Polish Society of Surgical Oncology, Polish Society of Clinical Oncology, Polish Society of Radiation Oncology, Polish Society of Nuclear Medicine, Polish Society of Paediatric Endocrinology, Polish Society of Paediatric Surgeons, Polish Society of Ultrasonography Gliwice-Wisła, 2015 DECLARATION: These recommendations are created by the group of delegates of the National Societies, which declare their willingness to participate in the preparation of the revised version of the Polish Guidelines. The members of the Working Group have been chosen from the specialists involved in medical care of patients with thyroid carcinoma. Directly before the preparation of the Polish national recommendations the American Thyroid Association (ATA) published its own guidelines together with a wide comment fulfilling evidence-based medicine (EBM) criteria. ATA Guidelines are consistent with National Comprehensive Cancer Network (NCCN) Recommendation. According to the members of the Working Group, it is necessary to adapt them to both the specific Polish epidemiological situation as well as to the rules referring to the Polish health system. Therefore, the Polish recommendations constitute a consensus of the experts' group, based on ATA information. The experts analysed previous Polish Guidelines, published in 2010, and other available data, and after discussion summed up the results in the form of these guidelines. It should be added that Part II, which constitutes a pathological part, has been available at the website of the Polish Society of Pathologists for acceptance of the members of the Society, and no essential comments have been proposed. The Members of the Group decided that a subgroup elected from among them would update the Guidelines, according to EBM rules, every year. The Revised Guidelines should help physicians to make reasonable choices in their daily practice; however, the final decision concerning an individual patient should be made by the caring physician responsible for treatment, or optimally by a therapeutic tumour board together with the patient, and should take into consideration the patient's health condition. It should be emphasised that the recommendations may not constitute a strict standard of clinical management imposed on medical staff. The data from clinical trials concerning numerous clinical situations are scarce. In such moments the opinion of the management may differ from the recommendations after considering possible benefits and disadvantages for the patient.
Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.
2000-03-23
This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.
The Sport Concussion Assessment Tool 5th Edition (SCAT5): Background and rationale.
Echemendia, Ruben J; Meeuwisse, Willem; McCrory, Paul; Davis, Gavin A; Putukian, Margot; Leddy, John; Makdissi, Michael; Sullivan, S John; Broglio, Steven P; Raftery, Martin; Schneider, Kathryn; Kissick, James; McCrea, Michael; Dvořák, Jiří; Sills, Allen K; Aubry, Mark; Engebretsen, Lars; Loosemore, Mike; Fuller, Gordon; Kutcher, Jeffrey; Ellenbogen, Richard; Guskiewicz, Kevin; Patricios, Jon; Herring, Stanley
2017-06-01
This paper presents the Sport Concussion Assessment Tool 5th Edition (SCAT5), which is the most recent revision of a sport concussion evaluation tool for use by healthcare professionals in the acute evaluation of suspected concussion. The revision of the SCAT3 (first published in 2013) culminated in the SCAT5. The revision was based on a systematic review and synthesis of current research, public input and expert panel review as part of the 5th International Consensus Conference on Concussion in Sport held in Berlin in 2016. The SCAT5 is intended for use in those who are 13 years of age or older. The Child SCAT5 is a tool for those aged 5-12 years, which is discussed elsewhere. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Measuring engagement in fourth to twelfth grade classrooms: the Classroom Engagement Inventory.
Wang, Ze; Bergin, Christi; Bergin, David A
2014-12-01
Research on factors that may promote engagement is hampered by the absence of a measure of classroom-level engagement. Literature has suggested that engagement may have 3 dimensions--affective, behavioral, and cognitive. No existing engagement scales measure all 3 dimensions at the classroom level. The Classroom Engagement Inventory (CEI) was developed to fill this gap. In Study 1, exploratory and confirmatory factor analyses were conducted on data from 3,481 students from the 4th to 12th grade. The results suggested a 4-factor model of the CEI. Using these results, in Study 2 several items were revised and data were collected 1 year later from 4th to 12th grade students in the same school district as Study 1. Analyses were conducted on data from 3,560 students after data cleaning. A series of potential models was tested. The final results suggest a 5-factor 24-item CEI: (1) Affective Engagement, (2) Behavioral Engagement-Compliance, (3) Behavioral Engagement-Effortful Class Participation, (4) Cognitive Engagement, and (5) Disengagement. Results advance understanding of the construct of classroom engagement. The CEI fills a significant gap in measurement of engagement. The CEI is classroom level, measures multiple dimensions of engagement, uses self-report, is relatively short, and can be readily administered in classrooms from the 4th to 12th grade. PsycINFO Database Record (c) 2014 APA, all rights reserved.
Adams, M B; McMillen, I C
2000-01-01
We have investigated adrenal mRNA expression of the catecholamine synthetic enzymes tyrosine hydroxylase (TH) and phenylethanolamine N-methyltransferase (PNMT) following acute hypoxia in fetal sheep before (< 105 days gestation, n = 20) and after (> 125 days gestation, n = 20) the development of adrenal innervation and following pretreatment with the nicotinic receptor anatgonist hexamethonium (n = 12). Total RNA was extracted from fetal adrenal glands collected at specific time points at 3-20 h after the onset of either hypoxia (∼50% reduction in fetal arterial oxygen saturation (SO2) for 30 min), or normoxia. Before 105 days, there was a decrease in adrenal TH mRNA expression at 20 h after hypoxia and adrenal TH mRNA expression was directly related to the changes in arterial PO2 measured during normoxia and hypoxia. After 125 days, adrenal TH mRNA levels were suppressed for up to 12 h following hypoxia. In both age groups, adrenal PNMT mRNA expression increased at 3-5 h after hypoxia and was inversely related to the changes in fetal arterial PO2 during normoxia or hypoxia. After 125 days, the administration of hexamethonium (25 mg kg−1, I. V.) reduced TH mRNA but not PNMT mRNA expression after normoxia. After hexamethonium pretreatment, there was no significant change in either adrenal TH or PNMT mRNA expression following hypoxia. We conclude that acute hypoxia differentially regulates adrenal TH and PNMT mRNA expression in the fetal sheep both before and after the development of adrenal innervation. After the development of adrenal innervation, however, the effect of acute hypoxia upon adrenal TH and PNMT mRNA expression is dependent upon neurogenic input acting via nicotinic receptors. PMID:11118487
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
... incorporate Revision 4 of SRP Section 8.1 into the next revisions of the Regulatory Guide 1.206, ``Combined..., 2011 (76 FR 31381), the NRC published for public comment the proposed Revision 4 on Section 8.1 on... NUCLEAR REGULATORY COMMISSION [NRC-2011-0119] Final Staff Guidance, Revision 4 to Standard Review...
75 FR 4428 - Advisory Committee On Reactor Safeguards; Revised Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... NUCLEAR REGULATORY COMMISSION Advisory Committee On Reactor Safeguards; Revised Meeting Notice The Agenda for the 569th ACRS meeting, scheduled to be held on February 4-6, 2010, has been revised as noted below. Notice of this meeting was previously published in the Federal Register on Thursday, January 21...
75 FR 72844 - Advisory Committee on Reactor Safeguards; Revised Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards; Revised Meeting Notice The Agenda for the 578th ACRS meeting, scheduled to be held on December 2-4, 2010, has been revised as noted below. Notice of this meeting was previously published in the Federal Register on Wednesday, November 17...
76 FR 61118 - Advisory Committee on Reactor Safeguards; Revised Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-03
... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards; Revised Meeting Notice The Agenda for the 587th ACRS meeting, scheduled to be held on October 6-8, 2011, has been revised as noted below. Notice of this meeting was previously published in the Federal Register on September 26, 2011 (76...
75 FR 77574 - Proposed Revision of Class E Airspace; Savoonga, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
...-1103Airspace Docket No. 10-AAL-18] Proposed Revision of Class E Airspace; Savoonga, AK AGENCY: Federal Aviation... proposes to revise Class E airspace at Savoonga, AK. The amendment of three Standard Instrument Approach... Operations, Federal Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587. FOR...
75 FR 77573 - Proposed Revision of Class E Airspace; Shungnak, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
...-1104 Airspace Docket No. 10-AAL-19] Proposed Revision of Class E Airspace; Shungnak, AK AGENCY: Federal... proposes to revise Class E airspace at Shungnak, AK. The amendment of Standard Instrument Approach... Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587. FOR FURTHER INFORMATION CONTACT: Martha...
10 CFR Appendix D to Part 835 - Surface Contamination Values
Code of Federal Regulations, 2010 CFR
2010-01-01
... posting of contamination and high contamination areas in accordance with § 835.603(e) and (f) and...-228, Th-230, Th-228, Pa-231, Ac-227, I-125, I-129 20 500 Th-nat, Th-232, Sr-90, Ra-223, Ra-224, U-232... pressure, and then assessing the amount of radioactive material on the swipe with an appropriate instrument...
A SOLAR CYCLE LOST IN 1793-1800: EARLY SUNSPOT OBSERVATIONS RESOLVE THE OLD MYSTERY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Usoskin, Ilya G.; Mursula, Kalevi; Arlt, Rainer
2009-08-01
Because of the lack of reliable sunspot observations, the quality of the sunspot number series is poor in the late 18th century, leading to the abnormally long solar cycle (1784-1799) before the Dalton minimum. Using the newly recovered solar drawings by the 18-19th century observers Staudacher and Hamilton, we construct the solar butterfly diagram, i.e., the latitudinal distribution of sunspots in the 1790s. The sudden, systematic occurrence of sunspots at high solar latitudes in 1793-1796 unambiguously shows that a new cycle started in 1793, which was lost in the traditional Wolf sunspot series. This finally confirms the existence of themore » lost cycle that has been proposed earlier, thus resolving an old mystery. This Letter brings the attention of the scientific community to the need of revising the sunspot series in the 18th century. The presence of a new short, asymmetric cycle implies changes and constraints to sunspot cycle statistics, solar activity predictions, and solar dynamo theories, as well as for solar-terrestrial relations.« less
Air and Space Museum Apollo 40th Celebration
2009-07-19
NASA STS-125 Mission Commander Scott Altman speaks at the Apollo 40th anniversary celebration held at the National Air and Space Museum, Monday, July 20, 2009 in Washington. Photo Credit: (NASA/Bill Ingalls)
Final CSAPR Revisions Rule (77 FR 10324)
EPA finalizes revisions to the Transport Rule (76 FR 48208). These revisions address discrepancies in unit-specific modeling assumptions that affect the proper calculation of Transport Rule state budgets and assurance levels in several states.
75 FR 26151 - Proposed Revision of Class E Airspace; Kulik Lake, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
...-0270 Airspace Docket No. 10-AAL-8] Proposed Revision of Class E Airspace; Kulik Lake, AK AGENCY... action proposes to revise Class E airspace at Kulik Lake, AK. This action would correct an error in the... Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587. FOR FURTHER INFORMATION CONTACT: Gary Rolf...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... Promulgation of Implementation Plans; Texas; Revisions to Chapter 116 Which Relate to the Application Review... approve revisions to the Texas State Implementation Plan (SIP) submitted by the State of Texas to EPA on... implements the requirements of House Bill 3732, 80th Legislature (2007), and the Texas Health and Safety Code...
Final Revisions Rule Significant Contribution Assessment TSD
This Technical Support Document (TSD) presents quantitative assessments of the relationship between final revisions to the Transport Rule and the original analysis conducted for the final Transport Rule.
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Senate.
Presented is the 1975 amendment to the Developmental Disabilities Services and Facilities Construction Act. Described are revisions and extensions of the earlier act, including revision of grant and construction assistance for university affiliated facilities, and revision of special projects assistance. The earlier act's designation of rights of…
77 FR 63355 - Proposed Revision to Emergency Action Level Development Guidance Document
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... action level (EAL) scheme. The NRC is publishing this proposed revision to inform the public and solicit... EAL scheme using site-specific information. Dated at Rockville, Maryland, this 10th day of October...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-09
... the Final Staff Guidance Section 1.0, Revision 2 on Introduction and Interfaces AGENCY: Nuclear... Plants: LWR Edition,'' Section 1.0, Revision 2 on ``Introduction and Interfaces'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112730393). The NRC staff issues revisions to SRP...
77 FR 9515 - List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... Storage Casks: HI-STORM 100, Revision 8 AGENCY: Nuclear Regulatory Commission. ACTION: Direct final rule... regulations by revising the Holtec International HI-STORM 100 dry cask storage system listing within the... and safety will be adequately protected. This direct final rule revises the HI-STORM 100 listing in 10...
Frequent Questions about the Hazardous Waste Export-Import Revisions Final Rule
Answers questions such as: What new requirements did EPA finalize in the Hazardous Waste Export-Import Revisions Final Rule? Why did EPA implement these changes now? What are the benefits of the final rule? What are the compliance dates for the final rule?
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... the Final Staff Guidance Standard Review Plan Section 13.6.3, Revision 1 on Physical Security--Early... NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.3, Revision 1 on Physical Security...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design... issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.2, Revision 1 on Physical Security--Design Certification...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security... Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.1, Revision 1 on...
ERIC Educational Resources Information Center
Plake, Barbara S.; Wise, Lauress L.
2014-01-01
With the 2014 publication of the 5th revision of the "Standards for Educational and Psychological Testing," the cochairs of the Joint Committee for the revision process were asked to consider the role and importance of the "Standards" for the educational testing community, and in particular for members of the National Council…
ERIC Educational Resources Information Center
Early, Jessica Singer; Saidy, Christina
2014-01-01
This mixed method investigation included a quasi-experiment examining if revision instruction enhanced the substantive revising behavior of 15 English language learner (ELL) and multilingual 10th grade students enrolled in an English class for underperforming students in comparison to 14 non-ELL and multilingual students from the same class who…
2015-08-05
This final rule updates the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs) (which are freestanding IPFs and psychiatric units of an acute care hospital or critical access hospital). These changes are applicable to IPF discharges occurring during fiscal year (FY) 2016 (October 1, 2015 through September 30, 2016). This final rule also implements: a new 2012-based IPF market basket; an updated IPF labor-related share; a transition to new Core Based Statistical Area (CBSA) designations in the FY 2016 IPF Prospective Payment System (PPS) wage index; a phase-out of the rural adjustment for IPF providers whose status changes from rural to urban as a result of the wage index CBSA changes; and new quality measures and reporting requirements under the IPF quality reporting program. This final rule also reminds IPFs of the October 1, 2015 implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), and updates providers on the status of IPF PPS refinements.
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson adjusts his helmet as he puts on the launch-and-entry suit for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson completes putting on the launch-and-entry suit, with the helmet, for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Commander Lee Archambault fits the helmet on his launch-and-entry suit for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Pilot Tony Antonelli adds the helmet as he puts on his launch-and-entry suit for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips is eager for launch as he puts on his launch-and-entry suit. The crew will be heading for Launch Pad 39A and liftoff of space shuttle Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips completes putting on his launch-and-entry suit, including the helmet, for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-14
CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure. The White Room provides crew access into the shuttle. The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. Photo credit: NASA/Jack Pfaller
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold is eager for launch as he puts on his launch-and-entry suit. The crew will be heading for Launch Pad 39A and liftoff of space shuttle Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata is helped with his boots as he puts on his launch-and-entry suit. The crew will be heading for Launch Pad 39A and liftoff of space shuttle Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold completes putting on his launch-and-entry suit, including the helmet, for the launch of space shuttle Discovery. The crew will be heading for Launch Pad 39A and liftoff of Discovery, scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-14
CAPE CANAVERAL, Fla. – Bathed in light on Launch Pad 39A at NASA's Kennedy Space Center in Florida, space shuttle Discovery is revealed after the rotating service structure has been rolled back. The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. Photo credit: NASA/Jack Pfaller
2009-03-14
CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure. The White Room provides crew access into the shuttle. The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. Photo credit: NASA/Jack Pfaller
2009-03-11
CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure. The White Room provides crew access into the shuttle. The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
2009-03-11
CAPE CANAVERAL, Fla. – On Launch Pad 39A at NASA's Kennedy Space Center in Florida, the orbiter access arm and White Room are extended toward space shuttle Discovery after rollback of the rotating service structure. Above the external tank is the oxygen vent hood, called the "beanie cap." The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. The rotating structure provides protected access to the shuttle for changeout and servicing of payloads at the pad. After the RSS is rolled back, the orbiter is ready for fuel cell activation and external tank cryogenic propellant loading operations. The mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett
USDA-ARS?s Scientific Manuscript database
The International Committee on the Taxonomy of Viruses potyvirus study group has revised the description of the family Potyviridae for inclusion in the ICTV 9th report. Characteristic features of each genus within the family is presented. Revised criteria for demarcation and nomenclature of viral sp...
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons cast a halo of light on space shuttle Atlantis as the spacecraft approaches Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kevin O'Connell
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons light the way home as space shuttle Atlantis' iconic white frame appears over the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons light the way home as space shuttle Atlantis' iconic white frame appears over the Shuttle Landing Facility's Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Sandra Joseph
2011-07-21
CAPE CANAVERAL, Fla. -- Xenons cast a halo of light on space shuttle Atlantis as the spacecraft approaches Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kevin O'Connell
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... 20 GPS-equipped cellular transmitter tags on seals in the main Hawaiian Islands in the past two years... 1 year of a proposed revision to critical habitat: (1) Finalize the proposed revision; (2) withdraw.... Section 4(b)(6)(B)(i) allows a 6-month extension of the 1-year deadline for a final revision if there is...
ERIC Educational Resources Information Center
Kozikoglu, Ishak
2018-01-01
Bloom's taxonomy for the classification of the objectives in cognitive domain was developed in mid 1950s and this taxonomy was revised by a group with Anderson and Krathwohl by making some changes and revisions. The purpose of this research was to evaluate the objectives of 8th grade English curriculum and TEOG exam questions (national assessment…
ERIC Educational Resources Information Center
Loring, Katherine, Ed.; And Others
Two keynote addresses and 12 selected papers are included in these conference proceedings. The keynote address, "Seeing Our Way Clear: Feminist Re-Vision of the Academy" (Peggy McIntosh), describes the academy as a "hierarchical or layered pyramidal structure" and discusses the benefits of feminist revision. The first of 12…
ERIC Educational Resources Information Center
Gray, Nathan L.; Wolf, Patrick J.; Jensen, Laura I.
2008-01-01
With the passage of 2005 Wisconsin Act 125, private schools participating in the Milwaukee Parental Choice Program (MPCP) are now required to administer a nationally normed standardized test annually in reading, mathematics, and science to their MPCP (a.k.a. "Choice") students enrolled in the 4th, 8th, and 10th grades. The law further…
78 FR 13897 - Final Revision and Publication of the 2012 Form M-1, Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
... DEPARTMENT OF LABOR Employee Benefits Security Administration RIN 1210-AB51 Final Revision and Publication of the 2012 Form M-1, Notice AGENCY: Employee Benefits Security Administration, Department of... Security Administration's (EBSA) Web site at www.dol.gov/ebsa . The revised form is substantively different...
EPA announced the availability of the final report, Metabolically Derived Human Ventilation Rates: A Revised Approach Based Upon Oxygen Consumption Rates. This report provides a revised approach for calculating an individual's ventilation rate directly from their oxygen c...
77 FR 13969 - Revising Standards Referenced in the Acetylene Standard
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
.... OSHA-2011-0183] RIN 1218-AC64 Revising Standards Referenced in the Acetylene Standard AGENCY: Occupational Safety and Health Administration (OSHA), Department of Labor. ACTION: Final rule; confirmation of effective date. SUMMARY: OSHA is confirming the effective date of its direct final rule that revises the...
Mortality Measures to Profile Hospital Performance for Patients With Septic Shock.
Walkey, Allan J; Shieh, Meng-Shiou; Liu, Vincent X; Lindenauer, Peter K
2018-04-30
Sepsis care is becoming a more common target for hospital performance measurement, but few studies have evaluated the acceptability of sepsis or septic shock mortality as a potential performance measure. In the absence of a gold standard to identify septic shock in claims data, we assessed agreement and stability of hospital mortality performance under different case definitions. Retrospective cohort study. U.S. acute care hospitals. Hospitalized with septic shock at admission, identified by either implicit diagnosis criteria (charges for antibiotics, cultures, and vasopressors) or by explicit International Classification of Diseases, 9th revision, codes. None. We used hierarchical logistic regression models to determine hospital risk-standardized mortality rates and hospital performance outliers. We assessed agreement in hospital mortality rankings when septic shock cases were identified by either explicit International Classification of Diseases, 9th revision, codes or implicit diagnosis criteria. Kappa statistics and intraclass correlation coefficients were used to assess agreement in hospital risk-standardized mortality and hospital outlier status, respectively. Fifty-six thousand six-hundred seventy-three patients in 308 hospitals fulfilled at least one case definition for septic shock, whereas 19,136 (33.8%) met both the explicit International Classification of Diseases, 9th revision, and implicit septic shock definition. Hospitals varied widely in risk-standardized septic shock mortality (interquartile range of implicit diagnosis mortality: 25.4-33.5%; International Classification of Diseases, 9th revision, diagnosis: 30.2-38.0%). The median absolute difference in hospital ranking between septic shock cohorts defined by International Classification of Diseases, 9th revision, versus implicit criteria was 37 places (interquartile range, 16-70), with an intraclass correlation coefficient of 0.72, p value of less than 0.001; agreement between case definitions for identification of outlier hospitals was moderate (kappa, 0.44 [95% CI, 0.30-0.58]). Risk-standardized septic shock mortality rates varied considerably between hospitals, suggesting that septic shock is an important performance target. However, efforts to profile hospital performance were sensitive to septic shock case definitions, suggesting that septic shock mortality is not currently ready for widespread use as a hospital quality measure.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
...On January 30, 2012, the EPA proposed revisions to several provisions of the final National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources. The proposed revisions were made, in part, in response to a petition for reconsideration received by the Administrator following the promulgation of the October 29, 2009, final rule (``2009 final rule''). In this action, the EPA is finalizing those amendments, lifting the stay of the title V permit requirement issued on March 14, 2011, and lifting the stay of the final rule issued on October 25, 2012. In addition, this final action includes revisions to the EPA's approach for addressing malfunctions and standards applicable during startup and shutdown periods. This final action also includes amendments and technical corrections to the final rule to clarify applicability and compliance issues raised by stakeholders subject to the 2009 final rule. The revisions to the final rule do not reduce the level of environmental protection or emissions control on sources regulated by this rule but provide flexibility and clarity to improve implementation. This action also extends the compliance date for existing sources and the EPA's final response to all issues raised in the petition for reconsideration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
Site Investigation Report, Volume 1: Sections 1 through 6, Appendix A. A Site Investigation was performed at the 155th Air Refueling Group at Lincoln, NE to evaluate six areas of suspected contamination identified during a Preliminary Assessment. The sites that this investigation were conducted at are: Site 1- Fuel Farm, POL Storage Area, Site 2 - West End of Old Oak Creek, Site 3 Former Tank Cleaning/Hazardous Waste Storage Area, Site 4 - Access Road, Dust Control Area, , Site 5 - Army National Guard Oil Storage Area, and Site 6 - Hydraulic Pressure Check Unit Storage Area. The reportmore » recommended no further action for Sites 3 through 6 due to low levels or no contamination being found. The report recommended that the portion of Site 2 that is located downstream of Site 1 should be included in Site 1.« less
Kwak, Jin Il; Nam, Sun-Hwa; An, Youn-Joo
2018-02-01
Since the Korean Ministry of the Environment established the Master Plan for Water Environment (2006-2015), the need to revise the water quality standards (WQSs) has driven government projects to expand the standards for the protection of human health and aquatic ecosystems. This study aimed to provide an historical overview of how these WQSs were established, amended, and expanded over the past 10 years in Korea. Here, major projects related to national monitoring in rivers and the amendment of WQSs were intensely reviewed, including projects on the categorization of hazardous chemicals potentially discharged into surface water, the chemical ranking and scoring methodology for surface water (CRAFT, Chemical RAnking of surFace water polluTants), whole effluent toxicity (WET) management systems, the 4th, 5th, and 6th revisions of the water quality standards for the protection of human health, and efforts toward developing the 7th revision. In this review, we assimilated the past and current status as well as future perspectives of Korean surface WQSs. This research provides information that aids our understanding of how surface WQSs have been expanded, and how scientific approaches to ensure water quality have been applied at each step of the process in Korea.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... 2137-AE54 Hazardous Materials: Revision to Requirements for the Transportation of Batteries and Battery... batteries and battery-powered devices. This final rule corrects several errors in the January 14, 2009 final... batteries and battery-powered devices. This final rule corrects several errors in the final rule. Because...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-02
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9690-9] Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast Air Quality Management... State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... (SIP) revision submitted by the State of Georgia, through the Department of Natural Resources... SIP revision as a direct final rule without prior proposal because the Agency views this as a... public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA...
Vitamin D regulates tyrosine hydroxylase expression: N-cadherin a possible mediator.
Cui, X; Pertile, R; Liu, P; Eyles, D W
2015-09-24
Vitamin D is a neuroactive steroid. Its genomic actions are mediated via the active form of vitamin D, 1,25(OH)2D3, binding to the vitamin D receptor (VDR). The VDR emerges in the rat mesencephalon at embryonic day 12, representing the peak period of dopaminergic cell birth. Our prior studies reveal that developmental vitamin D (DVD)-deficiency alters the ontogeny of dopaminergic neurons in the developing mesencephalon. There is also consistent evidence from others that 1,25(OH)2D3 promotes the survival of dopaminergic neurons in models of dopaminergic toxicity. In both developmental and toxicological studies it has been proposed that 1,25(OH)2D3 may modulate the differentiation and maturation of dopaminergic neurons; however, to date there is lack of direct evidence. The aim of the current study is to investigate this both in vitro using a human SH-SY5Y cell line transfected with rodent VDR and in vivo using a DVD-deficient model. Here we show that in VDR-expressing SH-SY5Y cells, 1,25(OH)2D3 significantly increased production of tyrosine hydroxylase (TH), the rate-limiting enzyme in dopamine synthesis. This effect was dose- and time-dependent, but was not due to an increase in TH-positive cell number, nor was it due to the production of trophic survival factors for dopamine neurons such as glial-derived neurotrophic factor (GDNF). In accordance with 1,25(OH)2D3's anti-proliferative actions in the brain, 1,25(OH)2D3 reduced the percentage of dividing cells from approximately 15-10%. Given the recently reported role of N-cadherin in the direct differentiation of dopaminergic neurons, we examined here whether it may be elevated by 1,25(OH)2D3. We confirmed this in vitro and more importantly, we showed DVD-deficiency decreases N-cadherin expression in the embryonic mesencephalon. In summary, in our in vitro model we have shown 1,25(OH)2D3 increases TH expression, decreases proliferation and elevates N-cadherin, a potential factor that mediates these processes. Accordingly all of these findings are reversed in the developing brain in our DVD-deficiency model. Remarkably our findings in the DVD-deficiency model phenocopy those found in a recent model where N-cadherin was regionally ablated from the mesencephalon. This study has, for the first time, shown that vitamin D directly modulates TH expression and strongly suggests N-cadherin may be a plausible mediator of this process both in vitro and in vivo. Our findings may help to explain epidemiological data linking DVD deficiency with schizophrenia. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.
Cejas, Claudia
2017-06-01
The objective of this study was to evaluate metrics related to manuscripts rejected by AJR with and without review during 2014 and to determine their final disposition: no record of eventual publication, eventually published, published with modified authors and title, published with the same title but modified authors, and published with modified title but the same authors. A total of 1245 unsolicited manuscripts submitted from January to December 2014 were included in this retrospective analysis. Data were extracted from the AJR's manuscript submission system. Standard statistical analysis was used to assess the fate of a sample of 200 rejected manuscripts. Of the 200 manuscripts studied, 117 (59%) were published in other scientific journals (61 with revision, 56 without revision; Χ 2 = 0.329, p = 0.566). Thirty-two of the 61 manuscripts (52%) rejected after peer review were later published in other journals without changes in their titles or authors, 16 (26%) with changes only in authors, 10 (16%) with changes only in their titles, and three (5%) with changes in authors and titles. Twenty-six of the 56 manuscripts (46%) rejected without peer review were published without changes in their titles or authors, 17 (30%) with changes in authors, 11 (20%) with changes only in their titles, and two (4%) with changes in both authors and titles (p = 0.686). Ten articles were published in open access journals. Of the remaining articles, those that had been reviewed were published in journals with a mean impact factor ± SD of 2.37 ± 1.30, and those that had not been reviewed were published in journals with a mean impact factor of 2.04 ± 1.06. Analysis of the 25th and 75th percentiles revealed that values were also higher for the group rejected with review (Wilcoxon rank sum test: W = 1679, p = 0.1127). Out of 61 articles rejected for publication with review, 52.5% were published with changes to their abstracts, whereas the remaining 47.5% were unchanged. This analysis found that manuscripts submitted to AJR that were rejected after review were published in journals with higher impact factors than those rejected without review. The commentaries provided by AJR reviewers and section editors appear to improve the quality of rejected manuscripts and thus contribute to the scientific community.
Medical School Admissions: The Insider's Guide. 4th Revised Edition.
ERIC Educational Resources Information Center
Zebala, John A.; And Others
This revised and updated handbook written by recent medical school graduates offers a firsthand account of successful strategies for the medical school admissions process. Six chapters discuss the following topics: (1) premedical preparation (planning undergraduate study and picking the right college); (2) power techniques for higher grades…
75 FR 32269 - Revision of Class E Airspace; Wainwright, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
...-0080; Airspace Docket No. 10-AAL-2] Revision of Class E Airspace; Wainwright, AK AGENCY: Federal... Wainwright, AK, to accommodate amended Standard Instrument Approach Procedures (SIAPs), and one new Obstacle... Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907...
76 FR 43823 - Revision of Class E Airspace; Yakutat, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-22
...-0244 Airspace Docket No. 11-AAL-05] Revision of Class E Airspace; Yakutat, AK AGENCY: Federal Aviation... Airport, Yakutat, AK. The amendment of eight Standard Instrument Approach Procedures (SIAPs) has made this... INFORMATION CONTACT: Martha Dunn, Federal Aviation Administration, 222 West 7th Avenue, Box 14, Anchorage, AK...
ERIC Educational Resources Information Center
Arkansas State Univ., State University.
This curriculum package contains materials for teaching the career orientation course in the junior high schools of Arkansas. Following the introduction, which describes the course and provides a rationale for it, along with instructions to teachers for conducting the course, the package is divided into 35 units organized under five major…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... A. Section 330.1 Definitions The final rule revises the FDIC's deposit insurance rules (12 CFR Part... without rulemaking. B. Section 347.202 Definitions The final rule revises the FDIC's international banking... by the final rule. \\9\\ 12 U.S.C. 1821(a)(1)(E). The final rule merely conforms the FDIC's definition...
CSAPR June Revisions Rule (77 FR 34830)
EPA takes final action on revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals, published August 8, 2011).
Jalilvand, Aryan; Fleming, Margaret; Moreno, Courtney; MacFarlane, Dan; Duszak, Richard
2018-01-01
The 2015 conversion of the International Classification of Diseases (ICD) system from the ninth revision (ICD-9) to the 10th revision (ICD-10) was widely projected to adversely impact physician practices. We aimed to assess code conversion impact factor (CCIF) projections and revenue delay impact to help radiology groups better prepare for eventual conversion to ICD, 11th revision (ICD-11). Studying 673,600 claims for 179 radiologists for the first year after ICD-10's implementation, we identified primary ICD-10 codes for the top 90th percentile of all examinations for the entire enterprise and each subspecialty division. Using established methodology, we calculated CCIFs (actual ICD-10 codes ÷ prior ICD-9 codes). To assess ICD-10's impact on cash flow, average monthly days in accounts receivable status was compared for the 12 months before and after conversion. Of all 69,823 ICD-10 codes, only 7,075 were used to report primary diagnoses across the entire practice, and just 562 were used to report 90% of all claims, compared with 348 under ICD-9. This translates to an overall CCIF of 1.6 for the department (far less than the literature-predicted 6). By subspecialty division, CCIFs ranged from 0.7 (breast) to 3.5 (musculoskeletal). Monthly average days in accounts receivable for the 12 months before and after ICD-10 conversion did not increase. The operational impact of the ICD-10 transition on radiology practices appears far less than anticipated with respect to both CCIF and delays in cash flow. Predictive models should be refined to help practices better prepare for ICD-11. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-04
...This final rule implements changes that were proposed on November 29, 2012 in a proposed rule entitled Revisions to the Export Administration Regulations (EAR) To Make the Commerce Control List (CCL) Clearer. The changes in the November 29 proposed rule were informed by public comments received in response to an advance notice of proposed rulemaking entitled Commerce Control List: Revising Descriptions of Items and Foreign Availability published as part of the President's Export Control Reform (ECR) Initiative on December 9, 2010. This final rule implements changes that can be made to the CCL without requiring changes to multilateral export control regime guidelines or lists. This final rule also makes conforming changes and minor clarifications as a result of the publication of two final rules implementing the Export Control Reform Initiative: the April 16, 2013 final rule entitled Revisions to the Export Administration Regulations: Initial Implementation of Export Control Reform; and the July 8, 2013 final rule entitled Revisions to the Export Administration Regulations: Military Vehicles; Vessels of War; Submersible Vessels, Oceanographic Equipment; Related Items; and Auxiliary and Miscellaneous Items that the President Determines No Longer Warrant Control under the United States Munitions List. Lastly, this final rule is making revisions to the EAR as a result of public comments received in response to the November 29 proposed rule and to a notice of inquiry (NOI) entitled Request for Public Comments on Shipping Tolerances for Export Licenses Issued by the Bureau of Industry and Security (BIS), that BIS published on July 5, 2012.
77 FR 69788 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). The EPA proposes to grant final authorization to the hazardous waste program changes submitted by the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-29
... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of... Administration (Western) published proposed Principles for Integrated Resource planning (IRP) for use in its... December 6, 1994. After considering public comments on the proposed principles, Western adopted the Final...
Synthesis of (125) I-lamivudine and (125) I-lamivudine-ursodeoxycholic acid codrug.
Motaleb, M A; Abo-Kul, M; Ibrahim, Samy M; Saad, Shokry M; Arafat, Muhammad
2016-09-01
The preparation of (125) I-lamivudine ((125) I-3TC) and (125) I-lamivudine-ursodeoxycholic acid codrug ((125) I-3TC-UDCA), suitable for comparative biodistribution studies, is described. The synthesis of the unlabeled precursor 3TC-UDCA proceeds in an 11.6% yield, and the radiolabelling yields for (125) I-3TC and (125) I-3TC-UDCA were 89 and 92%, respectively. The final products are radiochemically pure (greater than 98%). Copyright © 2016 John Wiley & Sons, Ltd.
Swyers, K L; Wagner, J J; Dorton, K L; Archibeque, S L
2014-06-01
Two hundred fifty-two cross-bred yearling steers (406 ± 24 kg BW) were used in a completely randomized block design with a 2 × 2 factorial arrangement of treatments (7 pens/treatment) to evaluate the effects of dietary Saccharomyces cerevisiae fermentation product (SFP) and monensin (MON) on growth performance and carcass characteristics. Dietary treatments arranged as a 2 × 2 factorial were 1) with or without SFP and 2) with or without MON. Finishing diets contained 19.7% of DM as dried distiller's grains with solubles. Both SFP and MON were added in the total mixed ration in place of an equal amount of cornmeal (DM basis; target intake = 2.8 g of SFP and 33 mg of MON/kg of dietary DM). Each treatment group was offered ad libitum access to a transition ration from d 1 to 8 and then to the finishing ration from d 9 to 125. Body weights were collected on d 0, 28, 56, 84, 110, and 125. Initial and final BW was an average of 2-d weights (d -1 and 0 and d 124 and 125, respectively). Steers were shipped for harvest on d 125. Overall ADG was decreased (P = 0.03) in steers supplemented with SFP, but final BW was similar among treatments. Feeding SFP was associated with lighter (P < 0.01) HCW and a greater (P = 0.01) number of carcasses grading USDA Choice. Twelfth rib fat thickness was not affected by SFP (P = 0.82) or MON (P = 0.35), but numerical decreases in 12th rib fat thickness among cattle receiving SFP or MON alone contributed to a tendency (P = 0.07) for greater 12 rib fat thickness when SFP and MON were provided. There was no effect of treatment on cost of gain (P ≥ 0.21). The effects of SFP in the current study may have been limited in heavy yearling steers due to consumption of a finishing diet containing 19.7% dried distiller's grains with solubles.
ERIC Educational Resources Information Center
Horkay, Nancy, Ed.
As mandated by Congress, the National Assessment of Educational Progress (NAEP) surveys the educational accomplishments of U.S. students and monitors changes in those accomplishments. NAEP tracks the educational achievement of 4th, 8th, and 12th graders over time in selected content areas, and has been tracking achievement for 30 years. The goals…
Teachers' Perspective on whether the Mathematics Reform Will Change Turkey's Ranking in TIMSS
ERIC Educational Resources Information Center
Sezer, Renan; Guner, Necdet; Ispir, Oylum Akkus
2012-01-01
Turkish elementary mathematics program was revised in 2005. In 2011, Turkey participated in TIMSS at the 4th-grade level for the first time. 4th graders were educated using the new curriculum and thus their success rate on TIMSS can be considered as an evaluation of the new program. This study investigated Turkish 4th grade teachers' expectation…
76 FR 8627 - Revision of Class E Airspace; Platinum, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
...-1105; Airspace Docket No. 10-AAL-20] Revision of Class E Airspace; Platinum, AK AGENCY: Federal... Platinum, AK, to accommodate the addition of a Standard Instrument Approach Procedure (SIAP), at the... 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907) 271-2850; e...
76 FR 8624 - Revision of Class E Airspace; Barrow, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
...-0722 Airspace Docket No. 10-AAL-17] Revision of Class E Airspace; Barrow, AK AGENCY: Federal Aviation... Rogers Memorial Airport in Barrow, AK, in order to accommodate the amendment of five Standard Instrument... Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907...
76 FR 8625 - Revision of Class E Airspace; Savoonga, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
...-1103 Airspace Docket No. 10-AAL-18] Revision of Class E Airspace; Savoonga, AK AGENCY: Federal Aviation... Airport, Savoonga, AK. The amendment of three Standard Instrument Approach Procedures (SIAPs) plus the... Administration, 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907...
75 FR 12680 - Revision of Class E Airspace; Scammon Bay, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
...-1038; Airspace Docket No. 09-AAL-19] Revision of Class E Airspace; Scammon Bay, AK AGENCY: Federal... Scammon Bay, AK, to accommodate new Area Navigation (RNAV) Standard Instrument Approach Procedures (SIAPs..., 222 West 7th Avenue, Box 14, Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907) 271...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... Joaquin Valley Unified Air Pollution Control District, No. 08-17309 (9th Circuit)). In that case, NAHB...
Medical Surveillance Procedures Manual and Medical Matrix (Edition 4)
1991-09-01
1910.1016. PROGRAM REVISED 8/90. 4-142 * 179 ORGANOPHOSPHATE/CARANATE COMPOUNDS STRESSOR(S) IN THIS PROGRAM: NIOSH # CAS # CARBARYL FC5950000 63-25-2...4-87 179 CARBARYL .................................................... 4-143 125 CARBON BLACK...beta-PROPIOLACTONE .......................................... 4-151 179 PROPOXUR (BAYGON) ........................................... 4-147 186
30 CFR 250.125 - Service fees.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... Domestic Product by publication of a document in the Federal Register. If a significant adjustment is... Development Operations Coordination Document (DOCD) $3,971 for each well proposed; no fee for revisions § 250...
ERIC Educational Resources Information Center
Tipton, Charles M.
2013-01-01
Society members whose research publication during the past 125 yr had an important impact on the discipline of physiology were featured at the American Physiological Society (APS)'s 125th Anniversary symposium. The daunting and challenging task of identifying and selecting significant publications was assumed by the Steering Committee of the…
APS: 125 Years of Progress of Physiology as a Scientific Discipline and a Profession
ERIC Educational Resources Information Center
Carroll, Robert G.; Frank, Martin; Ra'anan, Alice; Matyas, Marsha L.
2013-01-01
The Experimental Biology 2012 meeting in San Diego, CA, included events to celebrate the 125th anniversary of the founding of the American Physiological Society (APS) and reflect on the recent accomplishments of the society. Most of the APS activities in the past quarter century were guided by a series of strategic plans. Membership in the APS…
2009-03-14
CAPE CANAVERAL, Fla. – Lights glow on the structures on Launch Pad 39A at NASA's Kennedy Space Center in Florida, after rollback of the rotating service structure from around space shuttle Discovery. The orbiter access arm and White Room are extended toward Discovery The White Room provides crew access into the shuttle. The rollback is in preparation for Discovery's liftoff on the STS-119 mission with a crew of seven. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. Photo credit: NASA/Jack Pfaller
76 FR 79541 - Revisions to Final Response to Petition From New Jersey Regarding SO2
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... Revisions to Final Response to Petition From New Jersey Regarding SO2 Emissions From the Portland Generating... Jersey Regarding SO2 Emissions From the Portland Generating Station (Portland) published November 7, 2011... Final Response to Petition From New Jersey Regarding SO2 Emissions From the Portland Generating Station...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-15
... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide.... Disposition: On May 13, 2010, the NRC staff issued the proposed Revision 0 on SRP Section 13.6.6 on ``Cyber...
Cunha Figueiredo, Amanda C; Trujillo, Janet; Freitas-Vilela, Ana Amélia; Franco-Sena, Ana Beatriz; Rebelo, Fernanda; Cunha, Geraldo Marcelo; de Castro, Maria Beatriz Trindade; Farnum, Amanda; Mokhtar, Rana R; Holick, Michael F; Kac, Gilberto
2017-12-01
Plasma concentrations of vitamin D metabolites can be inversely associated with depressive symptoms. However, few longitudinal studies have investigated this association, especially during pregnancy. The aim of this study was to investigate the association between concentrations of 25-hydroxyvitamin D [25(OH)D] and 1,25-dihydroxivitamin D [1,25(OH) 2 D] with the occurrence of depressive symptoms throughout pregnancy. A prospective cohort of 179 women was followed at 5th-13th, 20th-26th and 30th-36th gestational weeks. At each trimester of pregnancy, the plasma concentrations of 25(OH)D and 1,25(OH) 2 D were analyzed by liquid chromatography tandem mass spectroscopy. Vitamin D status was categorized according to the Endocrine Society Practice Guidelines and the Institute of Medicine. Depressive symptoms were measured at each trimester using the Edinburgh Postnatal Depressive Scale (cutoff ≥13). Statistical analyses included random intercept logistic regression models for longitudinal analyses. In the first trimester, the prevalence of 25(OH)D <75, <50 and <30 nmol/L were 69.3%, 14.0% and 1.7%, respectively. Prevalence of depressive symptoms were 20.1%, 14.7% and 7.8% for the first, second and third trimesters, respectively. The probability of occurrence of depressive symptoms decreased throughout pregnancy (p-value = 0.005). Women with higher concentrations of 25(OH)D in the first trimester presented a lower odds ratio (OR) for the development of depressive symptoms during pregnancy (OR = 0.98; 95%CI: 0.96 to 0.99, p-value = 0.047) in the adjusted model. In conclusion, there was a higher prevalence of vitamin D inadequacy and depressive symptoms during the first trimester. Higher 25(OH)D concentrations in the first trimester were associated with a decrease of 2% in the odds for presenting depressive symptoms throughout pregnancy. Copyright © 2017 Elsevier Ltd. All rights reserved.
Stochik, A M; Pal'tsev, M A; Zatravkin, S N; Stochik, A A
2011-01-01
This paper focuses on the revision of disease concepts that prevailed during the Galenism era and the formation of the scientific basis of pathology at the time of two scientific revolutions of the 17-19th centuries.
Measuring severe maternal morbidity: validation of potential measures.
Main, Elliott K; Abreo, Anisha; McNulty, Jennifer; Gilbert, William; McNally, Colleen; Poeltler, Debra; Lanner-Cusin, Katarina; Fenton, Douglas; Gipps, Theresa; Melsop, Kathryn; Greene, Naomi; Gould, Jeffrey B; Kilpatrick, Sarah
2016-05-01
Both maternal mortality rate and severe maternal morbidity rate have risen significantly in the United Sates. Recently, the Centers for Disease Control and Prevention introduced International Classification of Diseases, 9th revision, criteria for defining severe maternal morbidity with the use of administrative data sources; however, those criteria have not been validated with the use of chart reviews. The primary aim of the current study was to validate the Centers for Disease Control and Prevention International Classification of Diseases, 9th revision, criteria for the identification of severe maternal morbidity. This analysis initially required the development of a reproducible set of clinical conditions that were judged to be consistent with severe maternal morbidity to be used as the clinical gold standard for validation. Alternative criteria for severe maternal morbidity were also examined. The 67,468 deliveries that occurred during a 12-month period from 16 participating California hospitals were screened initially for severe maternal morbidity with the presence of any of 4 criteria: (1) Centers for Disease Control and Prevention International Classification of Diseases, 9th revision, diagnosis and procedure codes; (2) prolonged postpartum length of stay (>3 standard deviations beyond the mean length of stay for the California population); (3) any maternal intensive care unit admissions (with the use of hospital billing sources); and (4) the administration of any blood product (with the use of transfusion service data). Complete medical records for all screen-positive cases were examined to determine whether they satisfied the criteria for the clinical gold standard (determined by 4 rounds of a modified Delphi technique). Descriptive and statistical analyses that included area under the receiver operating characteristic curve and C-statistic were performed. The Centers for Disease Control and Prevention International Classification of Diseases, 9th revision, criteria had a reasonably high sensitivity of 0.77 and a positive predictive value of 0.44 with a C-statistic of 0.87. The most important source of false-positive cases were mothers whose only criterion was 1-2 units of blood products. The Centers for Disease Control and Prevention International Classification of Diseases, 9th revision, criteria screen rate ranged from 0.51-2.45% among hospitals. True positive severe maternal morbidity ranged from 0.05-1.13%. When hospitals were grouped by their neonatal intensive care unit level of care, severe maternal morbidity rates were statistically lower at facilities with lower level neonatal intensive care units (P < .0001). The Centers for Disease Control and Prevention International Classification of Diseases, 9th revision, criteria can serve as a reasonable administrative metric for measuring severe maternal morbidity at population levels. Caution should be used with the use of these criteria for individual hospitals, because case-mix effects appear to be strong. Copyright © 2016 Elsevier Inc. All rights reserved.
2008-08-05
CAPE CANAVERAL, Fla. – The shipping container with the Multi-Use Lightweight Equipment (MULE) carrier inside comes to rest in the airlock in the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center. The cover will be removed in the airlock. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE is part of the payload for the fifth and final shuttle servicing mission to NASA's Hubble Space Telescope, STS-125. The MULE carrier will join the Flight Support System, the Super Lightweight Interchangeable Carrier and the Orbital Replacement Unit Carrier in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch. The Relative Navigation Sensors and the New Outer Blanket Layers will be on the MULE. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay. Atlantis is targeted to launch Oct. 8 at 1:34 a.m. EDT. .Photo credit: NASA/Amanda Diller
Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia
EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.
ERIC Educational Resources Information Center
Midgette, Ekaterina; Haria, Priti
2016-01-01
The purpose of the study was to investigate the effects of two comprehensive argumentative writing interventions--Text Structure Instruction (TSI) and Text Structure Revision Instruction (TSRI)--on the eighth-grade students' ability to compose convincing essays that include structural elements of argumentative discourse. Both treatment groups…
Helping Children through Books: An Annotated Bibliography. 4th Revised Edition.
ERIC Educational Resources Information Center
Dole, Patricia Pearl, Comp.
Since the emphases in book publishing change constantly, this fourth revised edition has some new sections, such as ADHD, while the Substance Abuse and Gender Roles Sections have declined sharply. The bibliography's essential goal is the same as always, however: to illuminate problems children may be facing. The purpose is twofold: to help the…
Child Custody Rules in the Context of Swedish Family Law. Social Change in Sweden, No. 31.
ERIC Educational Resources Information Center
Ekdahl, Bertil
In recent years, existing family legislation in Sweden has undergone a review process resulting in extensive revisions. The decisive factor behind these revisions has been change in Swedish society during the 20th century, including urbanization, frequent changes in residence, fewer children per family, the labor force participation of most women…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-25
..., 2010, or SB No. TM TAE 125-1011 P1, dated June 9, 2010, into any engine. FAA AD Differences (f) This AD... Airworthiness Directives; Thielert Aircraft Engines GmbH (TAE) Models TAE 125-01 and TAE 125-02-99 Reciprocating Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule; request for comments...
Gandhi, Sonja; Shariff, Salimah Z; Fleet, Jamie L; Weir, Matthew A; Jain, Arsh K; Garg, Amit X
2012-01-01
Objective To evaluate the validity of the International Classification of Diseases, 10th Revision (ICD-10) diagnosis code for hyponatraemia (E87.1) in two settings: at presentation to the emergency department and at hospital admission. Design Population-based retrospective validation study. Setting Twelve hospitals in Southwestern Ontario, Canada, from 2003 to 2010. Participants Patients aged 66 years and older with serum sodium laboratory measurements at presentation to the emergency department (n=64 581) and at hospital admission (n=64 499). Main outcome measures Sensitivity, specificity, positive predictive value and negative predictive value comparing various ICD-10 diagnostic coding algorithms for hyponatraemia to serum sodium laboratory measurements (reference standard). Median serum sodium values comparing patients who were code positive and code negative for hyponatraemia. Results The sensitivity of hyponatraemia (defined by a serum sodium ≤132 mmol/l) for the best-performing ICD-10 coding algorithm was 7.5% at presentation to the emergency department (95% CI 7.0% to 8.2%) and 10.6% at hospital admission (95% CI 9.9% to 11.2%). Both specificities were greater than 99%. In the two settings, the positive predictive values were 96.4% (95% CI 94.6% to 97.6%) and 82.3% (95% CI 80.0% to 84.4%), while the negative predictive values were 89.2% (95% CI 89.0% to 89.5%) and 87.1% (95% CI 86.8% to 87.4%). In patients who were code positive for hyponatraemia, the median (IQR) serum sodium measurements were 123 (119–126) mmol/l and 125 (120–130) mmol/l in the two settings. In code negative patients, the measurements were 138 (136–140) mmol/l and 137 (135–139) mmol/l. Conclusions The ICD-10 diagnostic code for hyponatraemia differentiates between two groups of patients with distinct serum sodium measurements at both presentation to the emergency department and at hospital admission. However, these codes underestimate the true incidence of hyponatraemia due to low sensitivity. PMID:23274673
Fleet, Jamie L; Shariff, Salimah Z; Gandhi, Sonja; Weir, Matthew A; Jain, Arsh K; Garg, Amit X
2012-01-01
Objectives Evaluate the validity of the International Classification of Diseases, 10th revision (ICD-10) code for hyperkalaemia (E87.5) in two settings: at presentation to an emergency department and at hospital admission. Design Population-based validation study. Setting 12 hospitals in Southwestern Ontario, Canada, from 2003 to 2010. Participants Elderly patients with serum potassium values at presentation to an emergency department (n=64 579) and at hospital admission (n=64 497). Primary outcome Sensitivity, specificity, positive-predictive value and negative-predictive value. Serum potassium values in patients with and without a hyperkalaemia code (code positive and code negative, respectively). Results The sensitivity of the best-performing ICD-10 coding algorithm for hyperkalaemia (defined by serum potassium >5.5 mmol/l) was 14.1% (95% CI 12.5% to 15.9%) at presentation to an emergency department and 14.6% (95% CI 13.3% to 16.1%) at hospital admission. Both specificities were greater than 99%. In the two settings, the positive-predictive values were 83.2% (95% CI 78.4% to 87.1%) and 62.0% (95% CI 57.9% to 66.0%), while the negative-predictive values were 97.8% (95% CI 97.6% to 97.9%) and 96.9% (95% CI 96.8% to 97.1%). In patients who were code positive for hyperkalaemia, median (IQR) serum potassium values were 6.1 (5.7 to 6.8) mmol/l at presentation to an emergency department and 6.0 (5.1 to 6.7) mmol/l at hospital admission. For code-negative patients median (IQR) serum potassium values were 4.0 (3.7 to 4.4) mmol/l and 4.1 (3.8 to 4.5) mmol/l in each of the two settings, respectively. Conclusions Patients with hospital encounters who were ICD-10 E87.5 hyperkalaemia code positive and negative had distinct higher and lower serum potassium values, respectively. However, due to very low sensitivity, the incidence of hyperkalaemia is underestimated. PMID:23274674
Treasure Along the Parker River.
ERIC Educational Resources Information Center
Fitzpatrick, Ann-Marie; And Others
Designed so that 100 to 125 heterogeneously grouped 7th and 8th grade students and a team of 5 core teachers might experience and discover the natural and historical "treasure" in the Parker River area of Massachusetts, this interdisciplinary unit centers on a hike to Parker River (6.7 miles) and visits to a cemetery, a monument, and Old…
Final Approval of California Air Plan Revision; Mobile Source Regulations
EPA is taking final action to approve a submittal by California to revise its SIP regulations establishing standards and requirements relating to the control of emissions from new and in-use ond and off-road vehicles and engines..
This document is a copy of the Federal Register publication of the November 20, 1990 Final Rule of Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) Revision for the Asbestos NESHAP.
Citrate gel-combustion synthesis and sintering of nanocrystalline ThO2 powders
NASA Astrophysics Data System (ADS)
Sanjay Kumar, D.; Ananthasivan, K.; Amirthapandian, S.; Dasgupta, Arup; Jogeswara Rao, G.
2017-12-01
A systematic study of the influence of citric acid to nitrate mole (R) ratio (R = 0 to 0.50) on the citrate gel-combustion synthesis of nanocrystalline (nc) ThO2 in bulk quantities (30 g) by using citrate gel-combustion was carried out. The nc-ThO2 powders were characterized for their bulk density, size distribution of particles, specific surface area, carbon residue and X-ray crystallite size. All these powders were compacted at pressures varying from 60 to 353 MPa and sintered by using the "two-step sintering" method. Powders prepared from a mixture with an "R" value of 0.125 compacted at 243 MPa yielded a maximum sintered density of 98.8 ± 0.3% T.D. For nc-ThO2, this is the highest sintered density reported so far. The microstructural investigations on nc-ThO2 powders were carried out by using both scanning electron microscopy (SEM) and transmission electron microscopy (TEM). SEM images of the sintered thoria monoliths revealed faceted grains with well defined grain boundaries. Shrinkage anisotropy factor (α) revealed that the compacts prepared from the powders obtained from starting mixtures with R values of 0.125-0.50 had undergone uniform sintering (near isotropic shrinkage).
30 CFR 550.125 - Service fees.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR... periodically according to the Implicit Price Deflator for Gross Domestic Product by publication of a document... Document (DOCD) $3,971 for each well proposed; no fee for revisions § 550.241(e). (6) [Reserved] (7...
30 CFR 550.125 - Service fees.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR... periodically according to the Implicit Price Deflator for Gross Domestic Product by publication of a document... Document (DOCD) $3,971 for each well proposed; no fee for revisions § 550.241(e). (6) [Reserved] (7...
30 CFR 550.125 - Service fees.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR... periodically according to the Implicit Price Deflator for Gross Domestic Product by publication of a document... Document (DOCD) $3,971 for each well proposed; no fee for revisions § 550.241(e). (6) [Reserved] (7...
Accommodating Thickness in Origami-Based Deployable Arrays
NASA Technical Reports Server (NTRS)
Zirbel, Shannon A.; Magleby, Spencer P.; Howell, Larry L.; Lang, Robert J.; Thomson, Mark W.; Sigel, Deborah A.; Walkemeyer, Phillip E.; Trease, Brian P.
2013-01-01
The purpose of this work is to create deployment systems with a large ratio of stowed-to-deployed diameter. Deployment from a compact form to a final flat state can be achieved through origami-inspired folding of panels. There are many models capable of this motion when folded in a material with negligible thickness; however, when the application requires the folding of thick, rigid panels, attention must be paid to the effect of material thickness not only on the final folded state, but also during the folding motion (i.e., the panels must not be required to flex to attain the final folded form). The objective is to develop new methods for deployment from a compact folded form to a large circular array (or other final form). This paper describes a mathematical model for modifying the pattern to accommodate material thickness in the context of the design, modeling, and testing of a deployable system inspired by an origami six-sided flasher model. The model is demonstrated in hardware as a 1/20th scale prototype of a deployable solar array for space applications. The resulting prototype has a ratio of stowed-to-deployed diameter of 9.2 (or 1.25 m deployed outer diameter to 0.136 m stowed outer diameter).
76 FR 79574 - Revisions to Final Response to Petition From New Jersey Regarding SO2
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
...This action proposes to amend the preamble and regulatory text to the Final Response to Petition From New Jersey Regarding SO2 Emissions From the Portland Generating Station (Portland) published November 7, 2011, to revise minor misstatements. These revisions clarify the EPA's finding that Portland significantly contributes to nonattainment or interferes with maintenance of the 1- hour sulfur dioxide (SO2) national ambient air quality standard (NAAQS) in the State of New Jersey, and not in specific counties within the state. These revisions have no impact on any other provisions of the rule.
ERIC Educational Resources Information Center
Cubberley, Ellwood Patterson
Published in 1922, this book examines changes in rural life during the 19th century, and resulting problems and effects on rural schooling in the early 20th century. The book suggests that by the early 20th century, rural schools had lost their former importance to the community and were far behind compared to the progress of urban schools. The…
Airborne Next: Rethinking Airborne Organization and Applying New Concepts
2015-06-01
9 Kenneth Macksey, Guderian: Panzer General-revised EDITION (South Yorkshire, England: Greenhill Books, 2003), 1–20. 10 Dr. John Arquilla...Airborne Operations: Field Manual 90=26, 1–5. 14 The 1st Special Forces Regiment has five active Special Forces Groups (1st, 3rd, 5th , 7th, 10th...Oxford University Press, 1981). Headrick, in his book, describes the interplay between technology and imperialism. For the purposes of this research
Assessing Peer Victimization across Adolescence: Measurement Invariance and Developmental Change
ERIC Educational Resources Information Center
Rosen, Lisa H.; Beron, Kurt J.; Underwood, Marion K.
2013-01-01
An upward extension of the Revised Social Experience Questionnaire (Paquette & Underwood, 1999) was tested in a sample of adolescents followed longitudinally from 7th through 10th grade. We hypothesized that a 2-factor model with overt and social victimization factors would fit the data better than would a unidimensional model (a single…
Carpentry. Competency Statements/Objectives and Reference Guide. Revised.
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education.
This curriculum guide provides competency statements/objectives for an 11th- to 12th-grade trade and industrial education course in carpentry. The first half of the guide consists of competency statements for the 35 units of the curriculum. Each competency statement consists of a terminal objective and specific objectives for each unit, referenced…
Problem Gambling in Chinese American Adolescents: Characteristics and Risk Factors
ERIC Educational Resources Information Center
Chiu, Eddie Yu-Wai; Woo, Kent
2012-01-01
This preliminary study examined the characteristics and risk factors of problem gambling among Chinese American adolescents. A total of 192 Chinese American students (aged 13-19) from 9th to 12th grades were recruited from three high schools in San Francisco, California. Students were administered the South Oaks Gambling Screen Revised for…
75 FR 19671 - International Standards on the Transport of Dangerous Goods; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-15
... Standards on the Transport of Dangerous Goods; Public Meeting AGENCY: Pipeline and Hazardous Materials... the 37th session of the United Nations Sub-Committee of Experts on the Transport of Dangerous Goods... consider proposals for the 17th Revised Edition of the United Nations Recommendations on the Transport of...
Crime and the Law: A 12th Grade Social Studies Course.
ERIC Educational Resources Information Center
Wisconsin State Dept. of Education, Madison.
The document outlines a semester-long 12th grade study of criminal law which is accomplished through an examination of Wisconsin and constitutional law. Six sections comprise the teaching outline. Section I, The Legislative Process, considers the legislature, various statutes and terminologies, revision of legislation, and penalties. Section II,…
Withdrawal of the Direct Final Revisions Rule (77 FR 28785)
EPA issued ‘‘Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone’’ as a direct final rule on February 21, 2012. Because EPA received adverse comments on this action, EPA withdrew the rule.
EPA is taking final action to revise the February 26, 2007 mobile source air toxics rule’s requirements that specify which benzene control technologies a refiner may utilize to qualify to generate early benzene credits.
77 FR 20399 - Agency Information Collection Activities: Notice; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... document finalizing proposed revisions to the Consolidated Financial Statements for Bank Holding Companies..., 2012 (77 FR 15755), a document finalizing proposed revisions to the Consolidated Financial Statements... financial information collection on BHCs between on-site inspections and contained two typographical errors...
Slit ventricle syndrome and early-onset secondary craniosynostosis in an infant
Ryoo, Hyun Gee; Kim, Seung-Ki; Cheon, Jung-Eun; Lee, Ji Yeoun; Wang, Kyu-Chang; Phi, Ji Hoon
2014-01-01
Patient: Female, 14 months Final Diagnosis: Slit ventricle syndrome Symptoms: Hydrocephalus • lethargy and seizure • vomiting Medication: — Clinical Procedure: — Specialty: Pediatrics and Neonatology Objective: Challenging differential diagnosis Background: Shunt surgery is a common solution for hydrocephalus in infancy. Slit ventricle syndrome and secondary craniosynostosis are late-onset complications after shunt placement; these 2 conditions occasionally occur together. Case Report: We report a case of early-onset secondary craniosynostosis with slit ventricle syndrome after shunt surgery in an infant, which led to a catastrophic increase in intracranial pressure (ICP). A 4-month-old girl with a Dandy-Walker malformation underwent a ventriculoperitoneal shunt procedure. Her head circumference (HC) gradually decreased to approximately the 5th percentile for her age group after shunt surgery. Seven months later, she developed increased ICP symptoms and underwent a shunt revision with a diagnosis of shunt malfunction. Her symptoms were temporarily relieved, but she repeatedly visited the emergency room (ER) for the same symptoms and finally collapsed, with an abrupt increase in ICP, 3 months later. Further evaluation revealed the emergence of sagittal synostosis at 7 months after initial shunt surgery. After reviewing all clinical data, slit ventricle syndrome combined with secondary craniosynostosis was diagnosed. Emergent cranial expansion surgery with shunt revision was performed, and the increased ICP signs subsided in the following days. Conclusions: Clinical suspicion and long-term HC monitoring are important in the diagnosis of slit ventricle syndrome and secondary craniosynostosis after shunt surgery, even in infants and young children. PMID:24944727
NASA Astrophysics Data System (ADS)
Hou, Bin; Ma, Xiaohua; Yang, Ling; Zhu, Jiejie; Zhu, Qing; Chen, Lixiang; Mi, Minhan; Zhang, Hengshuang; Zhang, Meng; Zhang, Peng; Zhou, Xiaowei; Hao, Yue
2017-07-01
In this paper, a normally-off AlGaN/GaN high-electron-mobility transistors (HEMT) fabricated using inductively coupled plasma (ICP) CF4 plasma recessing and an implantation technique is reported. A gate-to-channel distance of ˜10 nm and an equivalent negative fluorine sheet charge density of -1.21 × 1013 cm-2 extracted using a simple threshold voltage (V th) analytical model result in a high V th of 1.5 V, a peak transconductance of 356 mS/mm, and a subthreshold slope of 133 mV/decade. A small degradation of channel mobility leads to a high RF performance with f T/f max of 41/125 GHz, resulting in a record high f T × L g product of 10.66 GHz·µm among Schottky barrier AlGaN/GaN normally-off HEMTs with V th exceeding 1 V, to the best of our knowledge.
Managing the Finances. PACE Revised. Level 3. Unit 16. Research & Development Series No. 240CB16.
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This individualized, competency-based unit on managing finances, the 16th of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the other materials at this…
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This individualized, competency-based unit on managing customer credit and collection, the 17th of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the…
Managing Sales Efforts. PACE Revised. Level 3. Unit 14. Research & Development Series No. 240CB14.
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This individualized, competency-based unit on managing sales efforts, the 14th of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the other materials at…
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This individualized, competency-based unit on keeping business records, the 15th of 18 modules, is on the third level of the revised Program for Acquiring Competence in Entrepreneurship (PACE). Intended for the advanced secondary and postsecondary levels and for adults wanting training or retraining, this unit, together with the other materials at…
Promoting the Business. PACE Revised. Level 2. Unit 13. Research & Development Series No. 240BB13.
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This unit on promoting a small business, the 13th in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to learn about and try out…
Managing Sales Efforts. PACE Revised. Level 2. Unit 14. Research & Development Series No. 240BB14.
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This unit on managing sales efforts in a small business, the 14th in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to learn about and…
2013-08-06
This final rule updates the payment rates used under the prospective payment system for skilled nursing facilities (SNFs) for fiscal year (FY) 2014. In addition, it revises and rebases the SNF market basket, revises and updates the labor related share, and makes certain technical and conforming revisions in the regulations text. This final rule also includes a policy for reporting the SNF market basket forecast error in certain limited circumstances and adds a new item to the Minimum Data Set (MDS), Version 3.0 for reporting the number of distinct therapy days. Finally, this final rule adopts a change to the diagnosis code used to determine which residents will receive the AIDS add-on payment, effective for services provided on or after the October 1, 2014 implementation date for conversion to ICD-10-CM.
50 CFR 424.18 - Final rules-general.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A LISTING ENDANGERED AND THREATENED SPECIES AND DESIGNATING CRITICAL HABITAT Revision of the Lists § 424.18 Final rules—general. (a... rule to list, delist, or reclassify a species or designate or revise critical habitat will also provide...
50 CFR 424.18 - Final rules-general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A LISTING ENDANGERED AND THREATENED SPECIES AND DESIGNATING CRITICAL HABITAT Revision of the Lists § 424.18 Final rules—general. (a) Contents... reclassify a species or designate or revise critical habitat shall also provide a summary of factors...
75 FR 60261 - Federal Acquisition Regulation; Award-Fee Language Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
...-AL42 Federal Acquisition Regulation; Award-Fee Language Revision AGENCIES: Department of Defense (DoD...: Final rule. SUMMARY: The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) have adopted as final, with changes, the interim rule amending the Federal Acquisition...
78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-02
...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...
Cross-State Air Pollution Rule (CSAPR) State Budgets, Variability Limits, and Assurance Levels
These updated tables incorporate all adjustments finalized in the Supplemental Notice of Final Rulemaking (December 2011), the February Revisions Rule (February 7, 2012), and the June Revisions Rule (June 5, 2012) for the CSAPR for SO2, NOx and Ozone
EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.
50 CFR 424.18 - Final rules-general.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF COMMERCE); ENDANGERED SPECIES COMMITTEE REGULATIONS SUBCHAPTER A LISTING ENDANGERED AND THREATENED SPECIES AND DESIGNATING CRITICAL HABITAT Revision of the Lists § 424.18 Final rules—general. (a... rule to list, delist, or reclassify a species or designate or revise critical habitat will also provide...
Superconductivity in single crystalline ThBe13 and LuBe13
NASA Astrophysics Data System (ADS)
Uhlířová, Klára; Miura, Naoyuki; Tkáč, Vladimír; Prokleška, Jan; Chrobak, Maciej; Tarnawski, Zbigniew; Hidaka, Hiroyki; Yanagisawa, Tatsuya; Sechovský, Vladimír; Amitsuka, Hiroshi
2018-05-01
Single crystals of ThBe13 and LuBe13 have been prepared using aluminum flux method. The crystals structure of both compounds was confirmed to be cubic of the NaZn13-type with the lattice parameters a = 10.183(6) Å and a = 10.395(3) Å for LuBe13 and ThBe13, respectively. The low temperature measurements of electrical resistance and ac susceptibility have revealed a BCS-type of superconductivity in ThBe13 below Tc = 125 mK. LuBe13 has been found to be superconducting below Tc = 630 mK.
Zulauf Logoz, Marina
2014-01-01
The Revision and 5th Edition of the Diagnostic and Statistical Manual of Mental Disorders (DSM-5): Consequences for the Diagnostic Work with Children and Adolescents.The present paper describes and discusses the major revisions in DSM-5 for children and adolescents. A major modification is that the separate chapter for disorders first diagnosed in childhood and adolescence was abandoned in favour of the integration of these clinical pictures into the relevant disorder-specific chapters. Several new diagnoses and diagnostic groups were introduced: "Disruptive mood regulation disorder" is a new diagnosis; the different diagnoses for autism were brought together into one, and a new diagnostic group for obsessive-compulsive disorders has been established. The developmental approach of DSM-5 and the integration of dimensional assessment tools are to be welcomed. Practice will show if the critiques afraid of possible increases in prevalences or those who approve the changes will end up being right.
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Senate Committee on Labor and Human Resources.
This 10th and final hearing in a series related to the reauthorization of the Higher Education Act, focused on three specific areas: (1) the challenges posed by demographic changes in the college student population--nearly half of all students attend community colleges where the average age of students is 29; (2) the challenges and opportunities…
2010-07-29
CAPE CANAVERAL, Fla. -- This is a version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In 2011, the tribute was updated to reflect the addition of one more Atlantis flight -- STS-135 -- which will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. In the lower-left corner, it features Atlantis soaring above Earth and threaded through the design are the mission patches for each of Atlantis’ flights. Atlantis' accomplishments include seven missions to the Russian space station Mir and several assembly, construction and resupply missions to the International Space Station. Atlantis also flew the last Hubble Space Telescope servicing mission on STS-125. In the tribute, the planet Venus represents the Magellan probe being deployed during STS-30, and Jupiter represents the Galileo probe being deployed during STS-34. The inset photos illustrate various aspects of shuttle processing as well as significant achievements, such as the glass cockpit and the first shuttle docking with Mir during STS-71. The inset photo in the upper-left corner shows a rainbow over Atlantis on Launch Pad 39A and shuttle Endeavour on Launch Pad 39B at Kennedy. Endeavour was the assigned vehicle had Atlantis’ STS-125 mission needed rescue, and this was the last time both launch pads were occupied at the same time. The stars in the background represent the many people who have worked with Atlantis and their contributions to the vehicle’s success. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-161-KSC
2010-07-29
CAPE CANAVERAL, Fla. -- This is a printable version of space shuttle Atlantis' orbiter tribute, or OV-104, which hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In 2011, the tribute was updated to reflect the addition of one more flight -- STS-135 -- which will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. In the lower-left corner, it features Atlantis soaring above Earth and threaded through the design are the mission patches for each of Atlantis’ flights. Atlantis' accomplishments include seven missions to the Russian space station Mir and several assembly, construction and resupply missions to the International Space Station. Atlantis also flew the last Hubble Space Telescope servicing mission on STS-125. In the tribute, the planet Venus represents the Magellan probe being deployed during STS-30, and Jupiter represents the Galileo probe being deployed during STS-34. The inset photos illustrate various aspects of shuttle processing as well as significant achievements, such as the glass cockpit and the first shuttle docking with Mir during STS-71. The inset photo in the upper-left corner shows a rainbow over Atlantis on Launch Pad 39A and shuttle Endeavour on Launch Pad 39B at Kennedy. Endeavour was the assigned vehicle had Atlantis’ STS-125 mission needed rescue, and this was the last time both launch pads were occupied at the same time. The stars in the background represent the many people who have worked with Atlantis and their contributions to the vehicle’s success. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-161-KSC
2010-07-29
CAPE CANAVERAL, Fla. -- This orbiter tribute of space shuttle Atlantis, or OV-104, hangs in Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida. In 2011, the tribute was updated to reflect the addition of one more Atlantis flight -- STS-135 -- which will be the 33rd flight of Atlantis, the 37th shuttle mission to the space station, and the 135th and final mission of NASA's Space Shuttle Program. In the lower-left corner, it features Atlantis soaring above Earth and threaded through the design are the mission patches for each of Atlantis’ flights. Atlantis' accomplishments include seven missions to the Russian space station Mir and several assembly, construction and resupply missions to the International Space Station. Atlantis also flew the last Hubble Space Telescope servicing mission on STS-125. In the tribute, the planet Venus represents the Magellan probe being deployed during STS-30, and Jupiter represents the Galileo probe being deployed during STS-34. The inset photos illustrate various aspects of shuttle processing as well as significant achievements, such as the glass cockpit and the first shuttle docking with Mir during STS-71. The inset photo in the upper-left corner shows a rainbow over Atlantis on Launch Pad 39A and shuttle Endeavour on Launch Pad 39B at Kennedy. Endeavour was the assigned vehicle had Atlantis’ STS-125 mission needed rescue, and this was the last time both launch pads were occupied at the same time. The stars in the background represent the many people who have worked with Atlantis and their contributions to the vehicle’s success. Graphic design credit: NASA/Amy Lombardo. NASA publication number: SP-2010-08-161-KSC
2013-08-06
This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's "60 percent rule'' compliance calculation to determine "presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.
2016-12-14
The Architectural and Transportation Barriers Compliance Board (Access Board or Board) is issuing a final rule that revises its existing accessibility guidelines for non-rail vehicles--namely, buses, over-the-road buses, and vans--acquired or remanufactured by entities covered by the Americans with Disabilities Act. The revised guidelines ensure that such vehicles are readily accessible to, and usable by, individuals with disabilities. The U.S. Department of Transportation (DOT) is required to revise its accessibility standards for transportation vehicles acquired or remanufactured by entities covered by the Americans with Disabilities Act (ADA) to be consistent with the final rule.
EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S. Environmental Protection...
76 FR 6594 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S...
77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...
78 FR 25579 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-02
... prohibitions imposed by Federal regulations that EPA promulgates pursuant to the Hazardous and Solid Waste...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis' drag chute is illuminated as the spacecraft glides to a stop on Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. CAPE CANAVERAL, Fla. -- Xenons cast a halo of light on space shuttle Atlantis as the spacecraft approaches Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Carl Winebarger
High surface area ThO/sub 2/ catalyst
Colmenares, C.A.; Somorjai, G.A.; Maj, J.J.
1983-06-21
A ThO/sub 2/ catalyst having a high surface area of about 80 to 125m/sup 2//g is synthesized. The compound is synthesized by simultaneously mixing an aqueous solution of ThNO/sub 3/(NO/sub 3/)/sub 4/.4H/sub 2/O with an aqueous solution of Na/sub 2/CO/sub 3/.H/sub 2/O, to produce a solution and solid ThOCO/sub 3/. The solid ThOCO/sub 3/ is separated from the solution, and then calcined at a temperature of about 225 to 300/sup 0/C for about 40 to 55 hours to produce ThO/sub 2/. The ThO/sub 2/ catalyst produced includes Na present as a substitutional cation in an amount equal to about 5 to 10 at. %.
High surface area ThO.sub.2 catalyst and method of preparing it
Colmenares, Carlos A.; Somorjai, Gabor A.; Maj, Joseph J.
1985-01-01
A ThO.sub.2 catalyst having a high surface area of about 80-125 m.sup.2 /g is synthesized. The compound is synthesized by simultaneously mixing an aqueous solution of ThNO.sub.3 (NO.sub.3).sub.4.4H.sub.2 O with an aqueous solution of Na.sub.2 CO.sub.3.H.sub.2 O, to produce a solution and solid ThOCO.sub.3. The solid ThOCO.sub.3 is separated from the solution, and then calcined at a temperature of about 225.degree.-300.degree. C. for about 40-55 hours to produce ThO.sub.2. The ThO.sub.2 catalyst produced includes Na present as a substitutional cation in an amount equal to about 5-10 atom percent.
ERIC Educational Resources Information Center
Connecticut Univ., Storrs. Dept. of Educational Leadership.
This curriculum guide provides the plant science components of the vocational agriculture curriculum for Regional Vocational Agriculture Centers. The curriculum is divided into exploratory units for students in the 9th and 10th grades and specialized units for students in grades 11 and 12. The five exploratory units are: agricultural pest control;…
Food Science 7075. Curriculum Guide.
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational and Technical Education Services.
This curriculum guide was developed as a resource for teachers to use in planning and implementing a competency-based instructional program on food science in the 11th and 12th grades. It contains materials for a 2-semester course, based on the North Carolina Program of Studies (revised 1992); it is designed to help students learn about the…
78 FR 32556 - Navigation Underway; Tankers
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 164 Navigation Underway; Tankers CFR Correction In Title 33 of the Code of Federal Regulations, Parts 125 to 199, revised as of July 1, 2012, on page 598, after the source note for Sec. 164.13, the effective date note is reinstated to read as...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... From the Office of Management and Budget of a Currently Approved Information Collection Activity, Request for Comments; Certification and Operation FAR 125 AGENCY: Federal Aviation Administration (FAA... intention to request the Office of Management and Budget (OMB) to approve a current information collection...
Derated Application of Parts for ESD (Electronic Systems Division) System Development. Revision
1985-03-01
SSVAC Coearaen ~ree , neem ! adIrcuit ’design)~ Stress derating., __ o~~~~~:.mponent anplicatieonl ~blc ,ub~ This documnent establishes part...Channel & Breakdown Voltage 60% 70% 70% o N Channel) Max Tj (C) 95 105 125 48 MAXDM ALLOWABLE ABSOLUTE VALUE * OIL PERCENT OF RATED VALUE PART TYPE
77 FR 41692 - Significant New Use Rule for Phenol, 2,4- dimethyl-6-(1-methylpentadecyl)-
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
... visitors are required to show photographic identification, pass through a metal detector, and sign the EPA... often used as an additive in thermoplastic polymer matrices and in mixtures at concentrations less than... matrices. 5. Revises the recordkeeping requirements under Sec. 721.125 to reflect the modified significant...
14 CFR 125.207 - Emergency equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... equipment: (1) One approved first aid kit for treatment of injuries likely to occur in flight or in a minor accident, which meets the following specifications and requirements: (i) Each first aid kit must be dust... revised, or as approved by the Administrator. (ii) Required first aid kits must be readily accessible to...
The internal gravity wave spectrum in two high-resolution global ocean models
NASA Astrophysics Data System (ADS)
Arbic, B. K.; Ansong, J. K.; Buijsman, M. C.; Kunze, E. L.; Menemenlis, D.; Müller, M.; Richman, J. G.; Savage, A.; Shriver, J. F.; Wallcraft, A. J.; Zamudio, L.
2016-02-01
We examine the internal gravity wave (IGW) spectrum in two sets of high-resolution global ocean simulations that are forced concurrently by atmospheric fields and the astronomical tidal potential. We analyze global 1/12th and 1/25th degree HYCOM simulations, and global 1/12th, 1/24th, and 1/48th degree simulations of the MITgcm. We are motivated by the central role that IGWs play in ocean mixing, by operational considerations of the US Navy, which runs HYCOM as an ocean forecast model, and by the impact of the IGW continuum on the sea surface height (SSH) measurements that will be taken by the planned NASA/CNES SWOT wide-swath altimeter mission. We (1) compute the IGW horizontal wavenumber-frequency spectrum of kinetic energy, and interpret the results with linear dispersion relations computed from the IGW Sturm-Liouville problem, (2) compute and similarly interpret nonlinear spectral kinetic energy transfers in the IGW band, (3) compute and similarly interpret IGW contributions to SSH variance, (4) perform comparisons of modeled IGW kinetic energy frequency spectra with moored current meter observations, and (5) perform comparisons of modeled IGW kinetic energy vertical wavenumber-frequency spectra with moored observations. This presentation builds upon our work in Muller et al. (2015, GRL), who performed tasks (1), (2), and (4) in 1/12th and 1/25th degree HYCOM simulations, for one region of the North Pacific. New for this presentation are tasks (3) and (5), the inclusion of MITgcm solutions, and the analysis of additional ocean regions.
32 CFR 552.125 - Disposition of confiscated weapons.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 3 2012-07-01 2009-07-01 true Disposition of confiscated weapons. 552.125..., Ammunition, and Explosives-Fort Lewis, Washington § 552.125 Disposition of confiscated weapons. Commanders will maintain confiscated weapons in the unit arms room pending final disposition. They will provide...
32 CFR 552.125 - Disposition of confiscated weapons.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 3 2014-07-01 2014-07-01 false Disposition of confiscated weapons. 552.125..., Ammunition, and Explosives-Fort Lewis, Washington § 552.125 Disposition of confiscated weapons. Commanders will maintain confiscated weapons in the unit arms room pending final disposition. They will provide...
32 CFR 552.125 - Disposition of confiscated weapons.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 3 2010-07-01 2010-07-01 true Disposition of confiscated weapons. 552.125..., Ammunition, and Explosives-Fort Lewis, Washington § 552.125 Disposition of confiscated weapons. Commanders will maintain confiscated weapons in the unit arms room pending final disposition. They will provide...
32 CFR 552.125 - Disposition of confiscated weapons.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 3 2011-07-01 2009-07-01 true Disposition of confiscated weapons. 552.125..., Ammunition, and Explosives-Fort Lewis, Washington § 552.125 Disposition of confiscated weapons. Commanders will maintain confiscated weapons in the unit arms room pending final disposition. They will provide...
32 CFR 552.125 - Disposition of confiscated weapons.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 3 2013-07-01 2013-07-01 false Disposition of confiscated weapons. 552.125..., Ammunition, and Explosives-Fort Lewis, Washington § 552.125 Disposition of confiscated weapons. Commanders will maintain confiscated weapons in the unit arms room pending final disposition. They will provide...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... authorization during the comment period, the decision to authorize North Carolina's changes to its hazardous...
EPA is taking final action to approve a revision to the Antelope Valley Air Quality Management District (AVAQMD) portion of the California SIP concerning the emissions of volatile organic compounds (VOCs) from motor vehicle assembly coating operations.
78 FR 15299 - New York: Final Authorization of State Hazardous Waste Management Program Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-11
... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... Solid Waste Amendments of 1984 (HSWA). New Federal requirements and prohibitions imposed by Federal...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-01
... the California State Implementation Plan, Joaquin Valley Unified Air Pollution Control District and Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution...
75 FR 81187 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed Rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... Agency (EPA) to authorize states to operate their hazardous waste management programs in lieu of the...
This is the revised version of the Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule.
77 FR 60917 - Trinexapac-ethyl; Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... ``hog, meat by-products'' in order to correct inadvertent errors in the final rule tolerance table for...'' is revised to ``hog, meat by-products.'' V. Statutory and Executive Order Reviews This final rule... alphabetical order an entry for ``Hog, meat by-products''. 0 iii. Revising the entries for ``Wheat, forage...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
...- oriented monitors, and 65 [mu]g/m\\3\\, based on the three-year average of the 98th percentile of 24-hour PM 2.5 concentrations at each population-oriented monitor within an area (62 FR 38652). On October 17...)(2)(G): Emergency powers. 110(a)(2)(H): Future SIP revisions. 110(a)(2)(J): Consultation with...
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This unit on managing customer credit and collections in a small business, the 17th in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to…
Managing the Finances. PACE Revised. Level 2. Unit 16. Research & Development Series No. 240BB16.
ERIC Educational Resources Information Center
Ashmore, M. Catherine; Pritz, Sandra G.
This unit on managing the finances of a small business, the 16th in a series of 18 modules, is on the second level of the revised PACE (Program for Acquiring Competence in Entrepreneurship) comprehensive curriculum. Geared to advanced secondary and beginning postsecondary or adult students, the modules provide an opportunity to learn about and try…
Tsitsikas, Dimitris A; Morin, Amelie; Araf, Shamzah; Murtagh, Bernadine; Johnson, Gemma; Vinnicombe, Sarah; Ellis, Stephen; Suaris, Tamara; Wilks, Mark; Doffman, Sarah; Agrawal, Samir G
2012-07-01
Diagnosis of invasive aspergillosis (IA) remains a challenge as the clinical manifestations are not specific, and a histological diagnosis is often unfeasible. The 2002 European Organization for Research and Treatment of Cancer (EORTC) and the National Institute of Allergy and Infectious Diseases Mycoses Study Group (MSG) criteria for classification of cases into possible, probable or proven were revised in 2008. Our objective was to analyze the impact of these revisions on the diagnosis of IA. A retrospective analysis of 589 high risk patient-episodes revealed that 125 of 155 'possible' (81%) and 12 of 16 'probable' (75%) cases of IA should be changed to 'non-classifiable' when the new criteria were applied. We concluded, as expected, that the 2008 EORTC/MSG revised definitions reduced the number of cases classified as 'possible' IA, but additionally, there has been a dramatic reduction in 'probable' cases. These changes have significant implications on the interpretation of clinical trial data based on EORTC/MSG classifications.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-23
... Airworthiness Directives; Thielert Aircraft Engines GmbH Models TAE 125-02-99 and TAE 125-02-114 Reciprocating Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a... condition, if not corrected, could lead to in-flight cases of engine shutdown. We are issuing this AD to...
77 FR 24585 - List of Approved Spent Fuel Storage Casks: HI-STORM 100, Revision 8
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-25
... Storage Casks: HI-STORM 100, Revision 8 AGENCY: Nuclear Regulatory Commission. ACTION: Direct final rule... revising the Holtec International HI-STORM 100 System listing within the ``List of Approved Spent Fuel...) 72.214, by revising the Holtec International HI-STORM 100 System listing within the ``List of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... Promulgation of Air Quality Implementation Plans; New Mexico; Revisions to New Mexico Transportation Conformity... approve revisions to the New Mexico State Implementation Plan (SIP) concerning the State transportation... action on SIP revisions pertaining to the State of New Mexico. We have published a direct final rule...
2011-07-21
CAPE CANAVERAL, Fla. -- Workers measured and marked in bright green the letters "NLG" at the spot where space shuttle Atlantis' nose landing gear came to a stop after the vehicle's final return from space. Securing the space shuttle fleet's place in history on the STS-135 mission, Atlantis safely and successfully rounded out NASA's Space Shuttle Program on the Shuttle Landing Facility's Runway 15 at Kennedy Space Center in Florida. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Workers measured and marked in bright red the letters "MLG" at the spot where space shuttle Atlantis' main landing gear came to a stop after the vehicle's final return from space. Securing the space shuttle fleet's place in history on the STS-135 mission, Atlantis safely and successfully rounded out NASA's Space Shuttle Program on the Shuttle Landing Facility's Runway 15 at Kennedy Space Center in Florida. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
The Crystal Structure of Thorium and Zirconium Dihydrides by X-ray and Neutron Diffraction
DOE R&D Accomplishments Database
Rundle, R.E.; Shull, C.G.; Wollan, E.O.
1951-04-20
Thorium forms a tetragonal lower hydride of composition ThH{sub 2}. The hydrides ThH{sub 2}, ThD{sub 2}, and ZrD{sub 2} have been studied by neutron diffraction in order that hydrogen positions could be determined. The hydrides are isomorphous, and have a deformed fluorite structure. Metal-hydrogen distances in thorium hydride are unusually large, as in UH{sub 3}. Thorium and zirconium scattering amplitudes and a revised scattering amplitude for deuterium are reported.
2009-03-15
CAPE CANAVERAL, Fla. – The STS-119 crew members pause for photos before boarding the Astrovan to take them to Launch Pad 39A at NASA's Kennedy Space Center in Florida for launch of space shuttle Discovery to the International Space Station. From left are Mission Specialists Koichi Wakata, John Phillips, Richard Arnold, Steve Swanson and Joseph Acaba, Pilot Tony Antonelli and Commander Lee Archambault. Wakata represents the Japan Aerospace Exploration Agency and will remain on the International Space Station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the space station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2009-03-15
CAPE CANAVERAL, Fla. – Honoring tradition, the crew of space shuttle Discovery's STS-119 mission pose for a photo at the breakfast table at NASA's Kennedy Space Center in Florida. From left are Mission Specialists Steve Swanson, Joseph Acaba, Pilot Tony Antonelli, Commander Lee Archambault, and Mission Specialists John Phillips, Richard Arnold and Koichi Wakata, who represents the Japan Aerospace Exploration Agency. Following the meal, the crew members will put on their launch-and-entry suits and head for Launch Pad 39A. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. Photo credit: NASA/Jack Pfaller
O'Shea, Geoffrey; Bashore, Theodore R
2012-01-01
The American Journal of Psychology (AJP) was founded in 1887 by G. Stanley Hall during what Edwin G. Boring (1950) called the Period of Mental Chronometry and, consistent with the prevailing interests of the time, featured articles of relevance to scientists in this research domain. Contained in the early volumes of AJP were several articles that examined what have become some of the enduring issues faced by researchers studying the structure and timing of mental processing using reaction time (RT) procedures. Collectively, RT research published in AJP during its early years contributed to establishing mental chronometry as an important subfield of psychology. From 1900 to 1950 interest in mental chronometry waned, during what has been called its Dark Age. Nonetheless, interest in the effects of factors such as age and intelligence on total RT continued unabated. Numerous articles pertinent to these effects appeared in AJP. Finally, with the publication of Neisser's (1963) seminal work on visual search, AJP played an important role in reviving interest in mental chronometry in the latter half of the 20th century and continues in its 125th year of existence to contribute pertinent articles on contemporary research in mental chronometry.
Huang, Jennifer Juxiang; Sharda, Natasha; Riaz, Irbaz Bin; Alpert, Joseph S
2014-08-01
Antihypertensive therapy is associated with significant relative risk reductions in the incidence of heart failure, myocardial infarction, and stroke. However, a common adverse reaction to antihypertensive therapy is orthostatic hypotension, dehydration, and syncope. We propose that continued use of antihypertensive medications at the same dosage during the dry summer months in patients living in the Sonoran desert leads to an increase in syncopal episodes. All hypertensive patients who were treated with medications and admitted with International Classification of Diseases, 9th Revision code diagnosis of syncope were included. They were defined as "cases" if they presented during the summer months (May to September 2012) and "controls" if they presented during the winter months (November 2012 to March 2013). The primary outcome measure was the presence of clinical dehydration. The statistical significance was determined using the 2-sided Fisher exact test. A total of 496 patients with an International Classification of Diseases, 9th Revision code diagnosis of syncope were screened, and 179 patients were included in the final analysis. In patients taking antihypertensive medications, there were a significantly higher number of cases of syncope secondary to dehydration or orthostatic hypotension during the summer months (45%) compared with the winter months (26%) (P = .01). The incidence of syncope was significantly higher in older patients (63%) compared with younger individuals (37%) during the summer months. The incidence of syncope increases during the summer months among people who reside in a dry desert climate and who are taking antihypertensive medications. On the basis of our findings, we describe an easily preventable condition that we define as the "Summer Syncope Syndrome." We recommend judicious reduction of antihypertensive therapy in patients residing in a hot and dry climate, particularly during the summer months. Copyright © 2014 Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Alturki, Uthman T.
The goal of this research was to research, design, and develop a hypertext program for students who study biology. The Ecology Hypertext Program was developed using Research and Development (R&D) methodology. The purpose of this study was to place the final "product", a CD-ROM for learning biology concepts, in the hands of teachers and students to help them in learning and teaching process. The product was created through a cycle of literature review, needs assessment, development, and a cycle of field tests and revisions. I applied the ten steps of R&D process suggested by Borg and Gall (1989) which, consisted of: (1) Literature review, (2) Needs assessment, (3) Planning, (4) Develop preliminary product, (5) Preliminary field-testing, (6) Preliminary revision, (7) Main field-testing, (8) Main revision, (9) Final field-testing, and (10) Final product revision. The literature review and needs assessment provided a support and foundation for designing the preliminary product---the Ecology Hypertext Program. Participants in the needs assessment joined a focus group discussion. They were a group of graduate students in education who suggested the importance for designing this product. For the preliminary field test, the participants were a group of high school students studying biology. They were the potential user of the product. They reviewed the preliminary product and then filled out a questionnaire. Their feedback and suggestions were used to develop and improve the product in a step called preliminary revision. The second round of field tasting was the main field test in which the participants joined a focus group discussion. They were the same group who participated in needs assessment task. They reviewed the revised product and then provided ideas and suggestions to improve the product. Their feedback were categorized and implemented to develop the product as in the main revision task. Finally, a group of science teachers participated in this study by reviewing the product and then filling out the questionnaire. Their suggestions were used to conduct the final step in R&D methodology, the final product revision. The primary result of this study was the Ecology Hypertext Program. It considered a small attempt to give students an opportunity to learn through an interactive hypertext program. In addition, using the R&D methodology was an ideal procedure for designing and developing new educational products and material.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... Health Administration (OSHA); Department of Labor. ACTION: Final rule; confirmation of effective date. SUMMARY: OSHA is confirming the effective date of its direct final rule (DFR) revising the employee...(VI)). In the March 17, 2010, DFR document, OSHA stated that the DFR would become effective on June 15...
76 FR 6564 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... implement the RCRA hazardous waste management program. We granted authorization for changes to their program..., 06/ 62-730.185(1) F.A.C. Universal Waste Management. 29/07. State Initiated Changes to the 62-730.210...
77 FR 69765 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
... Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... revised program application, subject to the limitations of the Hazardous and Solid Waste Amendments of... under the authority of sections 2002(a), 3006, and 7004(b) of the Solid Waste Disposal Act as amended 42...
78 FR 15338 - New York: Final Authorization of State Hazardous Waste Management Program Revisions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-11
... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R02-RCRA-2013-0144; FRL-9693-3] New York: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... Assessment of Annual Needs for the List I Chemicals Ephedrine, Pseudoephedrine, and Phenylpropanolamine for... Annual Needs for 2010. SUMMARY: This notice establishes the Final Revised 2010 Assessment of Annual Needs...). The 2010 Assessment of Annual Needs represents those quantities of ephedrine, pseudoephedrine, and...
ERIC Educational Resources Information Center
Georgia Univ., Athens. Coll. of Education.
This learning module is designed to integrate environmental education into ninth- and tenth-grade chemistry classes. This module and a companion social studies module were pilot tested in Gwinnett County, Georgia in classes of students, many of whom had learning disabilities. It emphasizes activity learning. The module is divided into four parts.…
2009-06-03
This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).
76 FR 19908 - Revision of Distilled Spirits Plant Regulations; Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... No. TTB-2008-0004; T.D. TTB-92a; Re: T.D. TTB-92] RIN 1513-AA23 Revision of Distilled Spirits Plant... revising its distilled spirits plant regulations in the Federal Register of February 16, 2011 (76 FR 9080... Trade Bureau (TTB) recently published a final rule completely revising its distilled spirits plant...
Rothenfluh, Dominique A; Mueller, Daniel A; Rothenfluh, Esin; Min, Kan
2015-06-01
Several risk factors and causes of adjacent segment disease have been debated; however, no quantitative relationship to spino-pelvic parameters has been established so far. A retrospective case-control study was carried out to investigate spino-pelvic alignment in patients with adjacent segment disease compared to a control group. 45 patients (ASDis) were identified that underwent revision surgery for adjacent segment disease after on average 49 months (7-125), 39 patients were selected as control group (CTRL) similar in the distribution of the matching variables, such as age, gender, preoperative degenerative changes, and numbers of segments fused with a mean follow-up of 84 months (61-142) (total n = 84). Several radiographic parameters were measured on pre- and postoperative radiographs, including lumbar lordosis measured (LL), sacral slope, pelvic incidence (PI), and tilt. Significant differences between ASDis and CTRL groups on preoperative radiographs were seen for PI (60.9 ± 10.0° vs. 51.7 ± 10.4°, p = 0.001) and LL (48.1 ± 12.5° vs. 53.8 ± 10.8°, p = 0.012). Pelvic incidence was put into relation to lumbar lordosis by calculating the difference between pelvic incidence and lumbar lordosis (∆PILL = PI-LL, ASDis 12.5 ± 16.7° vs. CTRL 3.4 ± 12.1°, p = 0.001). A cutoff value of 9.8° was determined by logistic regression and ROC analysis and patients classified into a type A (∆PILL <10°) and a type B (∆PILL ≥10°) alignment according to pelvic incidence-lumbar lordosis mismatch. In type A spino-pelvic alignment, 25.5 % of patients underwent revision surgery for adjacent segment disease, whereas 78.3 % of patients classified as type B alignment had revision surgery. Classification of patients into type A and B alignments yields a sensitivity for predicting adjacent segment disease of 71 %, a specificity of 81 % and an odds ratio of 10.6. In degenerative disease of the lumbar spine a high pelvic incidence with diminished lumbar lordosis seems to predispose to adjacent segment disease. Patients with such pelvic incidence-lumbar lordosis mismatch exhibit a 10-times higher risk for undergoing revision surgery than controls if sagittal malalignment is maintained after lumbar fusion surgery.
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
Outgassing Data for Selecting Spacecraft Materials. Revision 4
NASA Technical Reports Server (NTRS)
Walter, Neil A.; Scialdone, John J.
1997-01-01
Outgassing data, derived from tests at 398 K (125 C) for 24 hours in a vacuum as per ASTM E 595-84, have been compiled for numerous materials for spacecraft use. The data presented are the total mass loss (TML) and the collected volatile condensable materials (CVCM). The various materials are compiled by likely usage and alphabetically.
Brown, Gregory G; Anderson, Vicki; Bigler, Erin D; Chan, Agnes S; Fama, Rosemary; Grabowski, Thomas J; Zakzanis, Konstantine K
2017-11-01
The American Psychological Association (APA) celebrated its 125th anniversary in 2017. As part of this celebration, the APA journal Neuropsychology has published in its November 2017 issue 11 papers describing some of the advances in the field of neuropsychology over the past 25 years. The papers address three broad topics: assessment and intervention, brain imaging, and theory and methods. The papers describe the rise of new assessment and intervention technologies, the impact of evidence for neuroplasticity on neurorehabilitation. Examples of the use of mathematical models of cognition to investigate latent neurobehavioral processes, the development of the field of neuropsychology in select international countries, the increasing sophistication of brain imaging methods, the recent evidence for localizationist and connectionist accounts of neurobehavioral functioning, the advances in neurobehavioral genomics, and descriptions of newly developed statistical models of longitudinal change. Together the papers convey evidence of the vibrant growth in the field of neuropsychology over the quarter century since APA's 100th anniversary in 1992. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
15 CFR 930.125 - Notice of appeal and application fee to the Secretary.
Code of Federal Regulations, 2014 CFR
2014-01-01
... OCEAN AND COASTAL RESOURCE MANAGEMENT FEDERAL CONSISTENCY WITH APPROVED COASTAL MANAGEMENT PROGRAMS... appeal to the Secretary, Herbert C. Hoover Building, 14th Street and Constitution Avenue, NW., Washington...
Site investigation for 125th fighter interceptor group Florida Air National Guard
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-01
A two-step Site Investigation (SI) was conducted to evaluate the nature and extent of environmental contamination that might have resulted from past activities at eight disposal/spill sites at the 125th Fighter Interceptor Group, Florida Air National Guard (FANG) in Jacksonville, Florida. The sites included in the SI are shown on the location map in Figure ES-i and briefly described below: Oil/water separator (OWS) inlets along the aircraft parking apron; Subsurface of aircraft parking apron; Fire training areas, separated for clarity into Site 3E for the east area and Site 3W for the west area; OWS at the Hush House; OWSmore » at the Vehicle Maintenance Building; Area outside the Munitions Building; Trim pad for aircraft run-up; OWS at the Wash Rack.« less
ERIC Educational Resources Information Center
Karakuyu, Yunus
2011-01-01
The purpose of this study is to determine the thoughts of primary science and technology teachers, primary class teachers, pre-service primary class teachers and pre-service primary science and technology teachers' about concept maps. This scale applied the use of basic and random method on the chosen 125 4th and 5th grade primary class teachers…
A psychometric evaluation of the Rorschach comprehensive system's perceptual thinking index.
Dao, Tam K; Prevatt, Frances
2006-04-01
In this study, we investigated evidence for reliability and validity of the Perceptual Thinking Index (PTI; Exner, 2000a, 2000b) among an adult inpatient population. We conducted reliability and validity analyses on 107 patients who met the Diagnostic and Statistical Manual of Mental Disorders (4th ed., text revision; American Psychiatric Association, 2000) criteria for a schizophrenia-spectrum disorder (SSD) or mood disorder with no psychotic features (MD). Results provided support for interrater reliability as well as internal consistency of the PTI. Furthermore, the PTI was an effective index in differentiating SSD patients from patients diagnosed with an MD. Finally, the PTI demonstrated adequate diagnostic statistics that can be useful in the classification of patients diagnosed with SSD and MD. We discuss methodological issues, implications for assessment practice, and directions for future research.
Bower, Joseph; Fast, Douglas; Garofolo, Fabio; Gouty, Dominique; Hayes, Roger; Lowes, Steve; Nicholson, Robert; LeLacheur, Richard; Bravo, Jennifer; Shoup, Ronald; Dumont, Isabelle; Carbone, Mary; Zimmer, Jennifer; Ortuno, Jordi; Caturla, Maria Cruz; Datin, Jim; Lansing, Tim; Fatmi, Saadya; Struwe, Petra; Sheldon, Curtis; Islam, Rafiqul; Yu, Mathilde; Hulse, Jim; Kamerud, John; Lin, John; Doughty, John; Kurylak, Kai; Tang, Daniel; Buonarati, Mike; Blanchette, Alexandre; Levesque, Ann; Gagnon-Carignan, Sofi; Lin, Jenny; Ray, Gene; Liu, Yanseng; Khan, Masood; Xu, Allan; El-Sulayman, Gibran; DiMarco, Chantal; Bouhajib, Mohammed; Tacey, Dick; Jenkins, Rand; der Strate, Barry van; Briscoe, Chad; Karnik, Shane; Rhyne, Paul; Garofolo, Wei; Schultz, Gary; Roberts, Andrew; Redrup, Mike; DuBey, Ira; Conliffe, Phyllis; Pekol, Teri; Hantash, Jamil; Cojocaru, Laura; Allen, Mike; Reuschel, Scott; Watson, Andrea; Farrell, Colin; Groeber, Elizabeth; Malone, Michele; Nowatzke, William; Fang, Xinping
2014-01-01
The 8th GCC Closed Forum for Bioanalysis was held in Baltimore, MD, USA on 5 December 2013, immediately following the 2013 AAPS Workshop (Crystal City V): Quantitative Bioanalytical Methods Validation and Implementation--The 2013 Revised FDA Guidance. This GCC meeting was organized to discuss the contents of the draft revised FDA Guidance on bioanalytical method validation that was published in September 2013 and consolidate the feedback of the GCC members. In attendance were 63 senior-level participants, from seven countries, representing 46 bioanalytical CRO companies/sites. This event represented a unique opportunity for CRO bioanalytical experts to share their opinions and concerns regarding the draft FDA Guidance, and to build unified comments to be provided to the FDA.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-26
..., we have decided it is not feasible to provide meaningful quantitative estimates of the incremental... potential economic impacts to oil spill response. This revision (i.e., replacing quantitative costs with a... and separate PCE in this final designation. As more research is completed, and we learn more of the...
EPA is taking final action to approve a revision to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California SIP concerning YSAQMD regarding RACT)requirements the 1997 8-hour ozone NAAQS and approve negative declarations into SIP.
75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... on the Web site: http://stellwagen.noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number identified below. DATES: The final revised management plan is available to the public on June 17, 2010. FOR FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank...
A Revised Estimate of 20th Century Global Mean Sea Level
NASA Astrophysics Data System (ADS)
Hay, C.; Morrow, E.; Kopp, R. E., III; Mitrovica, J. X.
2014-12-01
One of the primary goals of paleo-sea level research is to assess the stability of ice sheets and glaciers in warming climates. In this context, the 20th century may be thought of as the most recent, recorded, and studied of all past episodes of warming. Over the past decade, a consensus has emerged in the literature that 20th century global mean sea level (GMSL), inferred from tide gauge records, rose at a mean rate of 1.6-1.9 mm/yr. This sea-level rise can be attributed to multiple sources, including thermal expansion of the oceans, ice sheet and glacier mass flux, and anthropogenic changes in land water storage. The Fifth Assessment Report of the IPCC summarized the estimated contributions of these sources over 1901-1990 and computed a total rate, using a bottom-up approach, of ~1.0 mm/yr, which falls significantly short of the rate inferred from tide gauge records. Using two independent probabilistic approaches that utilize models of glacial isostatic adjustment, ocean dynamics, and the sea-level fingerprints of rapid land-ice melt to analyze tide gauge records (Kalman smoothing and Gaussian process regression), we are able to close the 20th century sea-level budget and resolve the above enigma. Our revised estimate for the rate of GMSL rise during 1901-1990 is 1.1-1.3 mm/yr (90% credible interval). This value, which is ~20-30% less than previous estimates, suggests that the change in the GMSL rate from the 20th century to the last two decades (2.7 ± 0.4 mm/yr, consistent with past estimates) was greater than previous estimates. Moreover, since some forward projections of GMSL change into the next century are based in part on past estimates of GMSL change, our revised rate may impact projections of GMSL rise for the 21st century and beyond.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
...This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
... Wheeling 8-hour ozone maintenance areas. This revision amends the maintenance plans' 2009 and 2018 motor... Revision and EPA's Review III. Final Action IV. Statutory and Executive Order Reviews I. Background On July... Review On March 14, 2011, the State of West Virginia submitted to EPA a formal revision to its SIP. The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
This is Site investigation Report, Volume 2 Appendix B through E. A Site Investigation was performed at the 155th Air Refueling Group at Lincoln, NE to evaluate six areas of suspected contamination identified during a Preliminary Assessment. The sites that this investigation were conducted at are: Site 1 - Fuel Farm, POL Storage Area Site 2 - West End of Old Oak Creek, Site 3 - Former Tank Cleaning/Hazardous Waste Storage Area, Site 4 - Access Road, Dust Control Area, Site 5 - Army National Guard Oil Storage Area, and Site 6 - Hydraulic Pressure Check Unit Storage Area. Themore » report recommended no further action for Sites 3 through 6 due to low levels or no contamination being found. The report recommended that the portion of Site 2 that is located downstream of Site 1 should be included in Site 1. Appendix 2 consist of the following appendix: Well Data and Geologic Boring Logs (Appendix B), Survey Data (Appendix C), Quality Control (Appendix D), and Analytical Results (Appendix E).« less
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis dwarfs the employees monitoring its arrival into the empty bay of Orbiter Processing Facility-2. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis and its employee entourage saunter along the towway from the Shuttle Landing Facility to the Orbiter Processing Facility at NASA's Kennedy Space Center in Florida. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the landing convoy vehicles line up to accompany space shuttle Atlantis from the Shuttle Landing Facility to an orbiter processing facility. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Employees accompany space shuttle Atlantis as it is slowly towed from the Shuttle Landing Facility to an orbiter processing facility at NASA's Kennedy Space Center in Florida. Looming in the background is the 525-foot-tall Vehicle Assembly Building. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, the landing convoy vehicles accompany space shuttle Atlantis as it is slowly towed from the Shuttle Landing Facility to an orbiter processing facility. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis is reflected in the water along the towway from the Shuttle Landing Facility to the Orbiter Processing Facility at NASA's Kennedy Space Center in Florida. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis noses its way toward the open door of Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- It is time for reflection at NASA's Kennedy Space Center in Florida as employees accompany space shuttle Atlantis as it is slowly towed from the Shuttle Landing Facility to an orbiter processing facility. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
ERIC Educational Resources Information Center
Georgia Univ., Athens. Coll. of Education.
This learning module is designed to integrate environmental education into ninth- and tenth-grade social studies courses. The module and a parallel module designed for chemistry classes were pilot tested in Gwinnett County, Georgia in 1975-76. The module is divided into four parts. The first part alerts students to the serious problems that growth…
ERIC Educational Resources Information Center
Georgia Univ., Athens. Coll. of Education.
This learning module is designed to integrate environmental education into ninth- and tenth-grade chemistry classes. This module and a companion social studies module were pilot tested in Gwinnett County, Georgia in 1975-76. The module is divided into four parts. Part one provides a broad overview of unit content and proposes questions to…
Manual for Courts-Martial, United States, 1984. Revision.
1984-01-01
301(d); 301a(c). See also S. Rep. No. 544. 89th Cong., Ist Sess. 13 (1965) which equates "all out war" to a declared war. The legislative history... Hammett v. Texas, 448 U.S. 725 )1974): Shellmun v. U.S. Lines, Inc.. 528 F. 2d 675 (9th Cir. 1975), cert. denied, 425 U.S. 936 (1976). Subsection (41 is
Honoring the 125th anniversary of Mississippi University for Women.
Rep. Childers, Travis [D-MS-1
2009-03-12
House - 05/14/2009 Referred to the Subcommittee on Higher Education, Lifelong Learning, and Competitiveness. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
75 FR 12678 - Revision of Class E Airspace; Dillingham, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2009-1055; Airspace Docket No. 09-AAL-16] Revision of Class E Airspace; Dillingham, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at...
Steps through the revision process of reproductive health sections of ICD-11.
Chou, Doris; Tunçalp, Özge; Hotamisligil, Selen; Norman, Jane; Say, Lale; Volkmer, Björn; Pattinson, Bob; Rooney, Cleo; Serour, Gamal; de Mouzon, Jacques; Gardosi, Jason; Thueroff, Joachim; Mark, Morgan; D'Hooghe, Thomas
2012-01-01
In 2007, the WHO initiated an organizational structure for the 11th revision of the International Classification of Diseases (ICD). Effective deployment of ICD-derived tools facilitates the use and collection of health information in a variety of resource settings, promoting quantitatively informed decisions. They also facilitate comparison of disease incidence and outcomes between different countries and different health care systems around the world. The Department of Reproductive Health and Research (RHR) coordinates the revision of chapters 14 (diseases of the genitourinary system), 15 (pregnancy, childbirth, and puerperium), and 16 (conditions originating in the perinatal period). RHR convened a technical advisory group (TAG), the Genito-Urinary Reproductive Medicine (GURM) TAG, for the ICD revision. The TAG's work reflects the collective understanding of sexual and reproductive health and is now available for review within the ICD-11 revision process. Copyright © 2012 S. Karger AG, Basel.
1969-08-30
44th TFS, Korat RTAFB, Thailand, were "in almost all cases... [areas] of suspected SAM activity, i.e., photo-occupied SAM sites, prepared and/ or...the bombing restrictions went into effect, a 7AF Tactics 1 - Conference met at Korat RTAFB, Thailand. A few of the proposed tactics revisions 3 were...Interview, Capt Rick Martin, 388th TFW, Korat RTAFB, Thailand, with Maj John C. Pratt, 7AF, DOAC, 8 Sep 69. I 12. (S) Hist Rprt, 388th TFW, Apr 67 - Jun 67
2008-03-14
OSHA is confirming the effective date of its direct final rule that revises a number of standards for general industry that refer to national consensus standards. The direct final rule states that it would become effective on March 13, 2008 unless OSHA receives significant adverse comment on these revisions by January 14, 2008. OSHA received no adverse comments by that date and, therefore, is confirming that the rule will become effective on March 13, 2008.
Kreder, Hans J; Grosso, Paul; Williams, Jack I; Jaglal, Susan; Axcell, Tami; Wal, Eugene K; Stephen, David J G
2003-02-01
Because of rationing of the limited pool of health care resources, access to total knee arthroplasty (TKA) is limited, but investigation of variables that predict complications, length of hospital stay, cost and outcomes of TKA may allow us to optimize the available resources. The objective of this study was to examine the effect of various factors on complication rates after TKA in patients managed in Ontario. Patients who had undergone an elective TKA between 1993 and 1996, as captured in the Canadian Institute for Health Information (CIHI) database, formed the study cohort. The CIHI dataset was used to obtain information regarding in-hospital complications, hospital length of stay, revision rates, infection rates and mortality. Generalized estimating linear or logistic regression equations were used to model outcomes as a function of age, gender, comorbidity, diagnosis and provider volume. During the study period, 14,352 patients in Ontario underwent TKA. Mortality at 3 months was associated with patient age, gender and comorbidity. There was no association between provider volume and mortality or the infection rate. Higher revision rates at 1 and 3 years were significantly associated with lower patient age and low hospital volume (p < 0.05). Hospitals in which fewer than 48 TKA procedures were done per year (< 40th percentile) had 2.2-fold greater 1-year revision rates than hospitals performing more than 113 TKAs annually (> 80th percentile). Complications during admission were associated with increased patient age and comorbidity, and higher hospital volume. Longer hospital stay was associated with female gender, increasing patient comorbidity and age, and lower provider volume. Surgeons who performed fewer than 14 TKAs annually (< 40th percentile) kept patients in hospital an average of 1.4 days longer than surgeons performing more than 42 TKAs annually (> 80th percentile). Patient variables significantly affect the rate of complications. Age, sex and comorbidity were significant predictors of complications, length of hospital stay and mortality after TKA. Although low surgeon volume was related to longer hospital stay, there was no association between surgeon volume and complication rates. The increased early revision rate for low-volume hospitals demands further study.
2001-01-19
The Occupational Safety and Health Administration (OSHA) is revising its rule addressing the recording and reporting of occupational injuries and illnesses (29 CFR parts 1904 and 1952), including the forms employers use to record those injuries and illnesses. The revisions to the final rule will produce more useful injury and illness records, collect better information about the incidence of occupational injuries and illnesses on a national basis, promote improved employee awareness and involvement in the recording and reporting of job-related injuries and illnesses, simplify the injury and illness recordkeeping system for employers, and permit increased use of computers and telecommunications technology for OSHA recordkeeping purposes. This rulemaking completes a larger overall effort to revise Part 1904 of Title 29 of the Code of Federal Regulations. Two sections of Part 1904 have already been revised in earlier rulemakings. A rule titled Reporting fatalities and multiple hospitalization incidents to OSHA, became effective May 2, 1994 and has been incorporated into this final rule as Section 1904.39. A second rule entitled Annual OSHA injury and illness survey of ten or more employers became effective on March 13, 1997 and has been incorporated into this final rule as Section 1904.41. The final rule being published today also revises 29 CFR 1952.4, Injury and Illness Recording and Reporting Requirements, which prescribes the recordkeeping and reporting requirements for States that have an occupational safety and health program approved by OSHA under Section 18 of the Occupational Safety and Health Act (the "Act" or "OSH Act").
2011-07-21
CAPE CANAVERAL, Fla. -- Deputy Chief of the Astronaut Office Rick Sturckow flies weather reconnaissance in a Shuttle Training Aircraft over NASA's Kennedy Space Center in Florida to assess the weather before space shuttle Atlantis returns to Earth for the last time. Weather was observed "go" and Atlantis touched down on Runway 15 at 5:57 a.m., bringing an end to the STS-135 mission and NASA's Space Shuttle Program. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Tony Gray
Administration Booklet: Teachers' Rating Questionnaire (Grade 2). Revised Form 1974. Paper No. 125.
ERIC Educational Resources Information Center
Wright, E.N.; Wyman, W.C.
Specific criteria for the rating of each questionnaire item are stated in detail. The teacher is asked, after reading the questions carefully, to assign each second grade student a rating for every question. This rating should be based on a personal knowledge of the student. The booklet is divided into three sections with section 1 focusing on…
30 CFR 250.296 - When and how must I submit a CID or a revision to a CID?
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information... service fee listed in § 250.125. (b) If you decide not to develop a reservoir you committed to develop in... to develop the reservoir and before the reservoir is bypassed. The Regional Supervisor will approve...
30 CFR 250.296 - When and how must I submit a CID or a revision to a CID?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER... accompanied by payment of the service fee listed in § 250.125. (b) If you decide not to develop a reservoir... after making your decision not to develop the reservoir and before the reservoir is bypassed. The...
2013-12-10
This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)
2011-07-21
CAPE CANAVERAL, Fla. -- Space shuttle Atlantis returns to Earth for the last time on Runway 15 at NASA's Kennedy Space Center in Florida just before sunrise. Atlantis touched down on Runway 15 at 5:57 a.m., bringing an end to the STS-135 mission and NASA's Space Shuttle Program. CAPE CANAVERAL, Fla. -- Xenons cast a halo of light on space shuttle Atlantis as the spacecraft approaches Runway 15 at NASA's Kennedy Space Center in Florida for the last time. Securing the space shuttle fleet's place in history, Atlantis marked the 26th nighttime landing of NASA's Space Shuttle Program and the 78th landing at Kennedy. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board are STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered more than 9,400 pounds of spare parts, equipment and supplies in the Raffaello multi-purpose logistics module that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles. For more information visit, www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Carl Winebarger
77 FR 27545 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-59; Introduction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... Revision of Cost 2012-003 Chambers. Accounting Standards Threshold. SUPPLEMENTARY INFORMATION: Summaries... substantial number of small entities. Item III--Revision of Cost Accounting Standards Threshold (FAR Case 2012-003) This final rule revises the cost accounting standards (CAS) threshold in order to implement in...
75 FR 918 - Oregon: Final Authorization of State Hazardous Waste Management Program Revision
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... hazardous waste management program under the Resource Conservation and Recovery Act, as amended (RCRA). On... has decided that the revisions to the Oregon hazardous waste management program satisfy all of the...
75 FR 41077 - Revision of Class E Airspace; Monterey, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-15
...-0633; Airspace Docket No. 10-AWP-12] Revision of Class E Airspace; Monterey, CA AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at...: History The FAA received a request from NACO to clarify the legal description of the existing Class E...
75 FR 30693 - Revised Medical Criteria for Evaluating Hearing Loss
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 404 [Docket No. SSA-2008-0016] RIN 0960-AG20 Revised Medical Criteria for Evaluating Hearing Loss AGENCY: Social Security Administration. ACTION: Final rules... claims involving hearing loss under titles II and XVI of the Social Security Act (Act). The revisions...
1995-09-18
This final rule revises the Medicare conditions for coverage of suppliers of end-stage renal disease services. The revisions remove general language in the regulations regarding water quality; incorporate by reference standards for monitoring the quality of water used in dialysis as published by the Association for the Advancement of Medical Instrumentation (AAMI) in its document, "Hemodialysis Systems" (second edition); and update existing regulations to incorporate by reference the second edition of AAMI's voluntary guidelines on "Reuse of Hemodialyzers."
ERIC Educational Resources Information Center
VANDERMEER, A. W.; AND OTHERS
THIS RESEARCH INVOLVED THE SELECTION OF TWO EXTANT TEACHING FILMS, DEVELOPMENT OF TESTS ON THEIR CONTENT, REVISION OF THE FILMS, AND A COMPARISON OF THE TWO VERSIONS. THE FILMS SELECTED WERE "WHY FOODS SPOIL" AND "ATOMS AND MOLECULES." THE SUBJECTS CONSISTED OF STUDENTS IN SMALL TOWN SCHOOLS FROM 5TH TO 12TH GRADES.…
The First Reactor [40th Anniversary Commemorative Edition].
DOE R&D Accomplishments Database
1982-12-01
This updated and revised story of the first reactor, or 'pile,' commemorates the 40th anniversary of the first controlled, self-sustaining nuclear chain reaction created by mankind. Enrico Fermi and his team of scientists initiated the reaction on December 2, 1941, underneath the West Stands of Stagg Field at the University of Chicago. Firsthand accounts of the participants as well as postwar recollections by Enrico and Laura Fermi are included.
2014-08-22
This final rule will update the hospice payment rates and the wage index for fiscal year (FY) 2015 and continue the phase-out of the wage index budget neutrality adjustment factor (BNAF). This rule provides an update on hospice payment reform analyses, potential definitions of "terminal illness'' and "related conditions,'' and information on potential processes and appeals for Part D payment for drugs while beneficiaries are under a hospice election. This rule will specify timeframes for filing the notice of election and the notice of termination/revocation; add the attending physician to the hospice election form, and require hospices to document changes to the attending physician; require hospices to complete their hospice aggregate cap determinations within 5 months after the cap year ends, and remit any overpayments; and update the hospice quality reporting program. In addition, this rule will provide guidance on determining hospice eligibility; information on the delay in the implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM); and will further clarify how hospices are to report diagnoses on hospice claims. Finally, the rule will make a technical regulations text change.
[Approach to Teaching Kampo Medicine at Kyoto Pharmaceutical University].
Matsuda, Hisashi
2016-01-01
An approach to educating our pharmaceutical students about Kampo medicine in the six-year system of undergraduate pharmacy education at Kyoto Pharmaceutical University is introduced, including the author's opinions. Curriculum revisions have been made in our university for students entering after 2012. In teaching Kampo medicine at present, a medical doctor and an on-site pharmacist share information difficult to give in a lecture with the teaching staff in my laboratory. For example, before the curriculum revision, we conferred with a pharmacist and a doctor in the course "Kampo Medicine A, B" for 4th year students, in which students were presented a basic knowledge of Kampo medicine, the application of important Kampo medicines, combinations of crude drugs, etc. Further, in our "Introduction to Kampo Medicine" for 6th year students, presented after they have practiced in hospitals and community pharmacies, we again lecture on the pharmacological characteristics of Kampo medicines, on "pattern (Sho)", and on evidence-based medicine (EBM) and research studies of important Kampo medicines. After our curriculum revision, "Kampo Medicine A, B" was rearranged into the courses "Kampo and Pharmacognosy" and "Clinical Kampo Medicine". "Kampo and Pharmacognosy" is now provided in the second semester of the 3rd year, and in this course we lecture on the basic knowledge of Kampo medicine. An advanced lecture will be given on "Clinical Kampo Medicine" in the 6th year. We are searching for the best way to interest students in Kampo medicine, and to counteract any misunderstandings about Kampo medicine.
Cheng, D H; Lu, H; Zou, X Q
2017-10-02
Objective: To explore the influence of the 4th revised treatment recommendations in childhood acute lymphoblastic leukemia (ALL) on high dose methotrexate(HD-MTX)-induced nephrotoxicity and MTX blood concentrations. Method: The clinical data from 330 ALL children who received 1 242 courses of HD-MTX therapies from September 2012 to November 2016 was collected. The courses were divided into two groups based on the chemotherapies: original scheme group was treated with the 3rd revised regimen, and new scheme group was treated with the 4th revised regimen. The two groups in acute kidney injury (AKI) and MTX blood concentrations were compared. Result: The incidences of AKI with low risk (LR) and intermediate risk (IR) in new scheme group were significantly lower than those in original scheme group (1.3%(3/229) vs . 7.9%(24/303), 4.9%(10/204) vs . 12.8%(26/203), χ(2)=11.831 and 7.888 respectively, both P <0.05). There was no significant difference in the incidence of AKI with high risk (HR) in the two groups (15.2%(10/66) vs . 10.5%(25/237), χ(2)=1.071, P >0.05). The 48h MTX blood concentrations and the interphase from onste to MTX concentrations decreased to the safe level with LR and IR children in new scheme group were significantly lower than those in original scheme group (0.36(0.08-4.00) vs . 0.44(0.06-32.00) μmol/L, 0.49(0.22-33.00) vs . 0.60(0.18-83.00) μmol/L, 3(2-6) vs . 3(2-11) d, 3(2-11) vs . 3(2-19) d, Z =-5.953, -2.658, -4.490 and -4.729 respectively, all P <0.05). The differences with HR were not observed between the two groups (0.61(0.14-36.00) vs . 0.71(0.11-68.00) μmol/L, 3(2-15) vs . 3(2-13) d, Z =-1.465 and -1.179 respectively, both P >0.05). Conclusion: Decreased renal toxicity and acceleration of MTX excretion may occur when childhood ALL with LR and IR were treated with the 4th revised regimen. However, nephrotoxicity and MTX blood concentrations have no significant differences with HR in the two regimens, and close monitoring are necessary.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
.... Colombia. III Revision of Cost 2012-003 Chambers. Accounting Standards Threshold. SUPPLEMENTARY INFORMATION... economic impact on a substantial number of small entities. Item III--Revision of Cost Accounting Standards Threshold (FAR Case 2012-003) This final rule revises the cost accounting standards (CAS) threshold in order...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-08
... 640 [Docket No. FDA-2003-N-0097; Formerly 2003N-0211] Revisions to Labeling Requirements for Blood and Blood Components, Including Source Plasma; Correction AGENCY: Food and Drug Administration, HHS. ACTION... published a final rule entitled ``Revisions to Labeling Requirements for Blood and Blood Components...
78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-04
... over time. Under the 2012 Planning Rule, the assessment of ecological, social, and economic trends and... environmental impact statement and revised Forest Plan for public review and comment, and the preparation of the final environmental impact statement and revised Forest Plan. The third stage of the process is...
77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would update and replace the minor new source review rules that EPA approved into the Hawaii SIP in 1983. DATES...
75 FR 32272 - Revision of Class E Airspace; Kaltag, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
...-0082; Airspace Docket No. 10-AAL-4] Revision of Class E Airspace; Kaltag, AK AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action revises Class E airspace at Kaltag, AK, to..., Anchorage, AK 99513-7587; telephone number (907) 271-5898; fax: (907) 271-2850; e-mail: [email protected
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-14
... Promulgation of Air Quality Implementation Plans; Virginia; Revision to the Definition of Volatile Organic... approve the State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia consisting... section of this Federal Register, EPA is approving Virginia's SIP submittal as a direct final rule without...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Definition of Volatile Organic... proposes to approve the State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia... (VOC). In the Final Rules section of this Federal Register, EPA is approving Virginia's SIP submittal...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... Promulgation of Implementation Plans; Texas; Revisions to Chapter 116 Which Relate to the Application Review... direct final action to approve revisions to the applicable State Implementation Plan (SIP) for the State... Texas Health and Safety Code, section 382.0566, concerning specific deadlines for review and issuance of...
Hugo A. Magana
2012-01-01
The Middle Rio Grande (MRG) of New Mexico has been influenced by man for over 500 years. Native Americans began diverting water to irrigate agricultural crops in the floodplain in the 14th century. The Spanish followed and increased agricultural irrigation to over 125 000 acres. Frequent flooding of the MRG valley in the 19th century led to many engineering projects in...
Air and Space Museum Apollo 40th Celebration
2009-07-19
Jazz pianist and singer Diana Krall holds a montage given to her by the STS-125 space shuttle crew along with Apollo 11 Astronaut Neil Armstrong at the Apollo 40th anniversary celebration held at the National Air and Space Museum, Monday, July 20, 2009 in Washington. From left, Michael J. Massimino, Michael T. Good, Gregory C. Johnson, Andrew J. Feustel, Krall, Scott D. Altman, Neil Armstrong, John M. Grunsfeld and Megan McArthur. Photo Credit: (NASA/Bill Ingalls)
Introduction to three decades of family psychology: Perspectives toward the future.
Fiese, Barbara H
2017-02-01
This article introduces the 30th anniversary of the Journal of Family Psychology (JFP) . In addition it marks the 125th anniversary of publications by the American Psychological Association. In recognition of this milestone the editorial team has invited the past editors of the journal to write brief reflections on the field and commenting on their vision for the future of the field. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
STS-8 atomic oxygen effects experiment
NASA Technical Reports Server (NTRS)
Visentine, J. T.; Leger, L. J.; Kuminecz, J. F.; Spiker, I. K.
1985-01-01
A flight experiment was performed on the eighth Space Shuttle mission to measure reaction of surfaces with atomic oxygen in the low earth orbital environment. More than 300 individual samples were exposed to ram (normal to surface) conditions for 41.75 hr leading to a total atomic oxygen fluence of 3.5 x 10 to the 20th atoms/sq cm. Reaction rates for surface recession measured primarily by mass change of several organic films were in the range of 3.0 x 10 to the -24th cu cm/atom, and less than 5 x 10 to the -26th cu cm/atom for Teflon. Effects of parameters such as temperature and solar radiation were assessed, as was the importance of atmospheric ionic species on surface recession. In an experiment performed on the fifth Space Shuttle flight, no temperature dependence of reaction rate for the organic films studied was found in the temperature range of 25 to 125 C. Preliminary findings indicate that the reactivity of organic films is not affected by temperature (in the range of 65 to 125 C), solar radiation, or ionic species. Significant surface morphology changes led to a carpet-like appearance also consistent with previous findings.
A revised version of the transfer matrix method to analyze one-dimensional structures
NASA Technical Reports Server (NTRS)
Nitzsche, F.
1983-01-01
A new and general method to analyze both free and forced vibration characteristics of one-dimensional structures is discussed in this paper. This scheme links for the first time the classical transfer matrix method with the recently developed integrating matrix technique to integrate systems of differential equations. Two alternative approaches to the problem are presented. The first is based upon the lumped parameter model to account for the inertia properties of the structure. The second releases that constraint allowing a more precise description of the physical system. The free vibration of a straight uniform beam under different support conditions is analyzed to test the accuracy of the two models. Finally some results for the free vibration of a 12th order system representing a curved, rotating beam prove that the present method is conveniently extended to more complicated structural dynamics problems.
[The Swiss border veterinary service in the 20th century].
Schluep, J
2018-01-01
The first animal disease act of Switzerland was released in 1872. Its revision in 1886 brought the basis for establishing a border veterinary inspection service. This service was first reporting to the federal Ministry of Agriculture; after 1914, the newly created Federal Veterinary Office became responsible for it. The border checks were first limited to live biungulate animals and horses; later on they were extended to meat and meat products and finally to venison and fishery products. At the beginning, part-time veterinarians with own practice were engaged. As the traffic increased, full time border veterinary inspectors joined the team; these were mainly active at the most important border posts (like Basel, St. Margrethen, Buchs, Chiasso, Geneva, more recently the international airports). The border veterinary inspection service, including the relevant instruction of the personnel, was (and is) financed with weight depending fees which included until 1966 a fee intended for financing the efforts to control livestocks epidemics.
What Is a Kilogram in the Revised International System of Units (SI)?
ERIC Educational Resources Information Center
Davis, Richard S.
2015-01-01
The definition of the kilogram, the unit of mass in the International System of Units (SI), has not changed in more than 125 years. The kilogram is still defined by the mass of a Pt-Ir cylinder conserved at the International Bureau of Weights and Measures. Science and technology have progressed to the point where it is likely the kilogram will be…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
...EPA is granting direct final approval of a revision to the Texas State Implementation Plan (SIP) concerning the Texas Low Emission Diesel fuel rules. The revisions clarify existing definitions and provisions, revise the approval procedures for alternative diesel fuel formulations, add new registration requirements, and update the rule to reflect the current program status because the rule is now fully implemented. This SIP revision meets statutory requirements.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
...EPA is taking final action to approve a revision to the California State Implementation Plan (SIP) submitted by the California Air Resources Board (CARB or Board). This revision concerns two regulations that reduce emissions of diesel particulate matter (PM), oxides of nitrogen (NOX), and other pollutants from in-use, heavy-duty diesel-fueled trucks and buses, and drayage trucks. EPA is approving this SIP revision because the Agency has determined that the regulations are consistent with the relevant Clean Air Act requirements, policies and guidance. Final approval of the two regulations and incorporation of them into the California SIP makes them federally enforceable.
2009-03-15
CAPE CANAVERAL, Fla. – The STS-119 crew members head for the Astrovan to take them to Launch Pad 39A at NASA's Kennedy Space Center in Florida for launch of space shuttle Discovery to the International Space Station. From left are Mission Specialists John Phillips, Koichi Wakata, Steve Swanson and Richard Arnold, Pilot Tony Antonelli, Mission Specialist Joseph Acaba (behind Antonelli) and Commander Lee Archambault. Wakata represents the Japan Aerospace Exploration Agency and will remain on the International Space Station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. Liftoff of Discovery is scheduled for 7:43 p.m. EDT on March 15. An earlier launch attempt March 11 was scrubbed at 2:36 p.m. due to a gaseous hydrogen leak from the external tank at the Ground Umbilical Carrier Plate during tanking. A seven-inch quick disconnect and two seals were replaced. The STS-119 mission is the 28th to the space station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden thanks the Kennedy work force for their dedication at an employee appreciation event for the thousands of workers who have processed, launched and landed America's space shuttles for more than three decades. Following the successful STS-135 mission, space shuttle Atlantis was parked at the celebration site for photo opportunities. STS-135 secured the space shuttle fleet's place in history and brought a close to NASA's Space Shuttle Program. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden, left, and Kennedy Space Center Director Bob Cabana join Kennedy employees in the Pledge of Allegiance at an employee appreciation event for the thousands of workers who have processed, launched and landed America's space shuttles for more than three decades. Following the successful STS-135 mission, space shuttle Atlantis was parked at the celebration site for photo opportunities. STS-135 secured the space shuttle fleet's place in history and brought a close to NASA's Space Shuttle Program. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
NASA Astrophysics Data System (ADS)
Kim, Kyung Chun; Lee, Sang Joon
2011-06-01
The 14th International Symposium on Flow Visualization (ISFV14) was held in Daegu, Korea, on 21-24 June 2010. There were 304 participants from 17 countries. The state of the art in many aspects of flow visualization was presented and discussed, and a total of 243 papers from 19 countries were presented. Two special lectures and four invited lectures, 48 paper sessions and one poster session were held in five session rooms and in a lobby over four days. Among the paper sessions, those on 'biological flows', 'micro/nano fluidics', 'PIV/PTV' and 'compressible and sonic flows' received great attention from the participants of ISFV14. Special events included presentations of 'The Asanuma Award' and 'The Leonardo Da Vinci Award' to prominent contributors. Awards for photos and movies were given to three scientists for their excellence in flow visualizations. Sixteen papers were selected by the Scientific Committee of ISFV14. After the standard peer review process of this journal, six papers were finally accepted for publication. We wish to thank the editors of MST for making it possible to publish this special feature from ISFV14. We also thank the authors for their careful and insightful work and cooperation in the preparation of revised papers. It will be our pleasure if readers appreciate the hot topics in flow visualization research as a result of this special feature. We also hope that the progress in flow visualization will create new research fields. The 15th International Symposium on Flow Visualization will be held in Minsk, Belarus in 2012. We would like to express sincere thanks to the staff at IOP Publishing for their kind support.
2011-05-19
Supply,” v; Sokolosky, 8; Peter Senge. The Fifth Discipline. Revised Edition (New York: Currency Books, 2005), 91. 73 Entezar, 73. 74 Reed, Slide 20...Afghanistan Investment Support Agency ( AISA ), an organization set up to support investors interested in Afghanistan. 197 LTG David M. Rodriguez, “Afghan...Revised Edition . New York: Currency Books, 2005. Selby, William. “U.S. Advisor Praises Progress of Afghan Army’s 205th Corps.” American Forces Press
The CODATA 2017 values of h, e, k, and N A for the revision of the SI
NASA Astrophysics Data System (ADS)
Newell, D. B.; Cabiati, F.; Fischer, J.; Fujii, K.; Karshenboim, S. G.; Margolis, H. S.; de Mirandés, E.; Mohr, P. J.; Nez, F.; Pachucki, K.; Quinn, T. J.; Taylor, B. N.; Wang, M.; Wood, B. M.; Zhang, Z.
2018-04-01
Sufficient progress towards redefining the International System of Units (SI) in terms of exact values of fundamental constants has been achieved. Exact values of the Planck constant h, elementary charge e, Boltzmann constant k, and Avogadro constant N A from the CODATA 2017 Special Adjustment of the Fundamental Constants are presented here. These values are recommended to the 26th General Conference on Weights and Measures to form the foundation of the revised SI.
ERIC Educational Resources Information Center
Merkel-Keller, Claudia
The State of New Jersey has proposed moving its competency test of basic skills from the 9th to the 11th grade, in order to allow for more content learning, more maturity, and more test-taking skills on the part of students. Since vocational students are more likely than other students to score low on the basic skills competency test, having the…
Bess, F H; Dodd-Murphy, J; Parker, R A
1998-10-01
This study was designed to determine the prevalence of minimal sensorineural hearing loss (MSHL) in school-age children and to assess the relationship of MSHL to educational performance and functional status. To determine prevalence, a single-staged sampling frame of all schools in the district was created for 3rd, 6th, and 9th grades. Schools were selected with probability proportional to size in each grade group. The final study sample was 1218 children. To assess the association of MSHL with educational performance, children identified with MSHL were assigned as cases into a subsequent case-control study. Scores of the Comprehensive Test of Basic Skills (4th Edition) (CTBS/4) then were compared between children with MSHL and children with normal hearing. School teachers completed the Screening Instrument for Targeting Education Risk (SIFTER) and the Revised Behavior Problem Checklist for a subsample of children with MSHL and their normally hearing counterparts. Finally, data on grade retention for a sample of children with MSHL were obtained from school records and compared with school district norm data. To assess the relationship between MSHL and functional status, test scores of all children with MSHL and all children with normal hearing in grades 6 and 9 were compared on the COOP Adolescent Chart Method (COOP), a screening tool for functional status. MSHL was exhibited by 5.4% of the study sample. The prevalence of all types of hearing impairment was 11.3%. Third grade children with MSHL exhibited significantly lower scores than normally hearing controls on a series of subtests of the CTBS/4; however, no differences were noted at the 6th and 9th grade levels. The SIFTER results revealed that children with MSHL scored poorer on the communication subtest than normal-hearing controls. Thirty-seven percent of the children with MSHL failed at least one grade. Finally, children with MSHL exhibited significantly greater dysfunction than children with normal hearing on several subtests of the COOP including behavior, energy, stress, social support, and self-esteem. The prevalence of hearing loss in the schools almost doubles when children with MSHL are included. This large, education-based study shows clinically important associations between MSHL and school behavior and performance. Children with MSHL experienced more difficulty than normally hearing children on a series of educational and functional test measures. Although additional research is necessary, results suggest the need for audiologists, speech-language pathologists, and educators to evaluate carefully our identification and management approaches with this population. Better efforts to manage these children could result in meaningful improvement in their educational progress and psychosocial well-being.
... disorders. In: Marx JA, Hockberger RS, Walls RM, et al, eds. Rosen's Emergency Medicine: Concepts and Clinical Practice . 8th ed. Philadelphia, PA: Elsevier Saunders; 2014:chap 125. Review Date 8/22/2016 Updated by: Laura J. Martin, MD, MPH, ABIM Board Certified in Internal Medicine ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... Wacker Dr., Wells, Van Buren & Clark Sts., Chicago, 13000294 McDonough County Macomb Courthouse Square..., Amsterdam, 13000308 New York County Fire Hook and Ladder Company No. 14, 120 E. 125th St., New York...
... Textbook of Pediatrics . 20th ed. Philadelphia, PA: Elsevier; 2016:chap 125. Jones KL, Jones MC, Del Campo M. Facial-limb defects as major feature. In: Jones KL, Jones MC, Del Campo M, eds. Smith's Recognizable Patterns of Human ... Updated by: Neil K. Kaneshiro, MD, MHA, Clinical ...
Revised Certification Standards for Pesticide Applicators
EPA has finalized stronger standards for people who apply restricted use pesticides (RUPs). These revisions to the Certification of Pesticide Applicators rule will reduce the likelihood of harm from the misapplication of toxic pesticides.
Vapor Intrusion Characterization Report (Revision 1.0)
Vapor Intrusion Characterization Report (Revision 1) - February 5, 2015: This report, which was approved by the EPA on February 18, 2015, documents the results from implementation of the Final Vapor Intrusion Characterization Work Plan.
Standards Improvement Project-Phase II. Final rule.
2005-01-05
The Occupational Safety and Health Administration (OSHA) through this final rule is continuing to remove and revise provisions of its standards that are outdated, duplicative, unnecessary, or inconsistent, or can be clarified or simplified by being written in plain language. The Agency completed Phase I of the Standards Improvement Project in June 1998. In this Phase II of the Standards Improvement Project, OSHA is again revising or removing a number of health provisions in its standards for general industry, shipyard employment, and construction. The Agency believes that the changes streamline and make more consistent the regulatory requirements in OSHA health and safety standards. In some cases, OSHA has made substantive revisions to requirements because they are outdated, duplicative, unnecessary, or inconsistent with more recently promulgated health standards. The Agency believes these revisions will reduce regulatory requirements for employers without reducing employee protection.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
...This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's ``60 percent rule'' compliance calculation to determine ``presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... taking direct final action to approve revisions to the Knox County portion of the Tennessee State... of the CAA. EPA is taking action to approve these SIP revisions. A. August 19, 2009, Submittal This... 16.3.C allowing law enforcement agencies to open burn contraband. EPA is not taking action on this...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-02
...-AA08 Special Local Regulations; Revision of 2013 America's Cup Regulated Area, San Francisco Bay; San...: The Coast Guard is revising the regulated area for the 2013 America's Cup sailing events. Previously... final rule regulating the on-water activities associated with the ``Louis Vuitton Cup,'' ``Red Bull...
78 FR 53029 - Air Quality: Revision to Definition of Volatile Organic Compounds-Exclusion of trans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-28
... Air Quality: Revision to Definition of Volatile Organic Compounds--Exclusion of trans 1-chloro-3,3,3.... SUMMARY: The EPA is taking final action to revise the regulatory definition of volatile organic compounds..., June 16, 2010), and as a solvent for metals, electronics, and precision cleaning and in adhesives...
Phonetic Aspects of Children's Elicited Word Revisions.
ERIC Educational Resources Information Center
Paul-Brown, Diane; Yeni-Komshian, Grace H.
A study of the phonetic changes occurring when a speaker attempts to revise an unclear word for a listener focuses on changes made in the sound segment duration to maximize differences between phonemes. In the study, five-year-olds were asked by adults to revise words differing in voicing of initial and final stop consonants; a control group of…
16 CFR § 1207.1 - Scope, purpose, and findings.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... CPSC, 569 F.2d 831 (5th Cir. 1978)). On December 18, 1978, the Commission published revisions to the..., regardless of the materials of manufacture or structural characteristics of the slides. It is estimated that...
8. DETAIL VIEW OF CONNECTION AT CENTER OF BRIDGE. WELDED ...
8. DETAIL VIEW OF CONNECTION AT CENTER OF BRIDGE. WELDED PLATE AND I-BARS ARE 20TH CENTURY REVISIONS. - Bucks County Bridge No. 313, Spanning Delaware Canal at Letchworth Avenue, Yardley, Bucks County, PA
Nichols, Joseph C; Osmani, Feroz A; Sayeed, Yousuf
2016-05-01
Health care payment models are changing rapidly, and the measurement of outcomes and costs is increasing. With the implementation of International Classification of Diseases 10th revision (ICD-10) codes, providers now have the ability to introduce a precise array of diagnoses for their patients. More specific diagnostic codes do not eliminate the potential for vague application, as was seen with the utility of ICD-9. Complete, accurate, and consistent data that reflect the risk, severity, and complexity of care are becoming critically important in this new environment. Orthopedic specialty organizations must be actively involved in influencing the definition of value and risk in the patient population. Now is the time to use the ICD-10 diagnostic codes to improve the management of patient conditions in data. Copyright © 2016 Elsevier Inc. All rights reserved.
[Two anniversaries in Czech forensic medicine].
Nečas, P; Hejna, P
2012-10-01
The authors commemorate the 100th anniversary of the publication of Slavíks textbook Forensic Pathology for Medical and Legal Students and the 125th anniversary of the 1st Czech forensic autopsy. They introduce professor V. Slavík and describe his personal qualities and expertise. The content of the textbook is described. The topicality of Slavíks explanations and the tradition of Czech forensic pathology are discussed. Key words: forensic pathology - history of Czech forensic pathology - textbooks of forensic pathology.
Michael Polanyi: Science as Personal Knowledge and Social Practice.
Nye, Mary Jo
2017-03-20
Tacit knowing: 2016 marked the 125th anniversary of the birth of the physical chemist Michael Polanyi, as well as the 40th of his death. This essay discusses his philosophy of science-in particular, his most significant work in this area, Personal Knowledge-from the perspective of his personal biography, as well as its lasting influence on the social sciences. In the photograph: Michael Polanyi at the Fritz Haber Institute in 1968. © 2017 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.
Fiegler, Patrycja; Kamiński, Kazimierz; Wegrzyn, Piotr
2003-05-01
The ultrasound, serum beta-HCG and progesterone titres are widely used to assess the risk of miscarriage at the early stages of pregnancy. Though very useful, they are not considered as satisfactorily accurate predictors of imminent abortion during the first three months of pregnancy. Prospective evaluation of clinical usefulness of serum CA125 from 4-12th week of pregnancy in a group of women with symptoms of imminent abortion. A study group were 250 consecutive women with symptoms of imminent abortion. Inclusion criteria were: abdominal pain, spotting, ultrasound picture of the embryo in the uterus, monovular pregnancy, normal ultrasound picture of ovaries, gestational age ranging from 4-12 weeks (assessed on a last menstrual period basis with ultrasound corroboration). 55 women with physiological course of pregnancy made up a control group. CA125 levels was evaluated with Roche Cobas Core CA125 II EIA. In patients with symptoms of imminent abortion, serum CA125 titration in 4 to 12 weeks' gestation seems to be valuable only in woman with vaginal spotting or bleeding.
A resolution honoring Gonzaga University on its 125th anniversary.
Sen. Murray, Patty [D-WA
2013-01-31
Senate - 01/31/2013 Submitted in the Senate, considered, and agreed to without amendment and with a preamble by Unanimous Consent. (All Actions) Tracker: This bill has the status Agreed to in SenateHere are the steps for Status of Legislation:
Vermeulen, Lee C; Moles, Rebekah J; Collins, Jack C; Gray, Andy; Sheikh, Abdul Latif; Surugue, Jacqueline; Moss, Robert J; Ivey, Marianne F; Stevenson, James G; Takeda, Yasuo; Ranjit, Eurek; Chaar, Betty; Penm, Jonathan
2016-07-15
The processes used to revise the 2008 Basel Statements on the future of hospital pharmacy are summarized, and the revised statements are presented. The process for revising the Basel Statements followed an approach similar to that used during their initial development. The Hospital Pharmacy Section (HPS) of the International Pharmaceutical Federation (FIP) revised the 2008 FIP Basel Statements in four phases, including a survey of hospital pharmacists worldwide, an internal review, online forums, and a face-to-face "World Café" workshop in Bangkok, Thailand. The global survey on the initial Basel Statements included input from 334 respondents from 62 countries. The majority of respondents agreed that most of the initial Basel Statements were acceptable as written and did not require revision. In total, 11 statements were judged by more than 10% of respondents as needing revision or deletion. The FIP HPS executive committee used the survey results to develop 69 initial revised draft statements. After an online discussion with the international hospital pharmacy community, including individuals from 28 countries representing all six World Health Organization regions, a final set of draft statements was prepared for the live discussion involving participants from 20 countries. The final 65 revised Basel Statements were voted on and accepted. Systematic revision of the FIP Basel Statements resulted in an updated reflection of aspirational goals for the future of hospital pharmacy practice. While this revision reflects the development of new goals for hospital pharmacy practice, the core principles of the Basel Statements remain an essential foundation for the discipline. Copyright © 2016 by the American Society of Health-System Pharmacists, Inc. All rights reserved.
1997-08-29
This interim final rule amendment is issued to implement the Single Audit Act Amendments of 1996 (Public Law 104-156, 110 Stat. 1396) and the June 24, 1997, revision of OMB Circular A-133, "Audits of States, Local Governments, and Non-Profit Organizations" and to replace the existing audit requirements that are superseded by Public Law 104-156 and the revised A-133.
2011-07-21
CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls space shuttle Atlantis toward Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Atlantis' aft end. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- With the assistance of a "towback" vehicle, space shuttle Atlantis inches its way into the empty bay of Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls space shuttle Atlantis toward Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Atlantis' aft end. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- Slowly and carefully, a "towback" vehicle pulls space shuttle Atlantis into the empty bay of Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- A "towback" vehicle slowly pulls space shuttle Atlantis toward Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida. A purge unit that pumps conditioned air into a shuttle after landing is connected to Atlantis' aft end. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, employees in Orbiter Processing Facility-2 monitor the alignment of space shuttle Atlantis as it is towed into the empty bay. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis is positioned between the work platforms of Orbiter Processing Facility-2 where it will be prepared for future public display at Kennedy's Visitor Complex. A purge unit that pumps conditioned air into a shuttle after landing is connected to Atlantis' aft end. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
2011-07-21
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Atlantis glides into position between the work platforms of Orbiter Processing Facility-2. A purge unit that pumps conditioned air into a shuttle after landing is connected to Atlantis' aft end. Once inside the processing facility, Atlantis will be prepared for future public display at Kennedy's Visitor Complex. Atlantis' final return from space at 5:57 a.m. EDT concluded the STS-135 mission, secured the space shuttle fleet's place in history and brought a close to America's Space Shuttle Program. Main gear touchdown was at 5:57:00 a.m. EDT, followed by nose gear touchdown at 5:57:20 a.m., and wheelstop at 5:57:54 a.m. On board were STS-135 Commander Chris Ferguson, Pilot Doug Hurley, and Mission Specialists Sandra Magnus and Rex Walheim. On the 37th shuttle mission to the International Space Station, STS-135 delivered the Raffaello multi-purpose logistics module filled with more than 9,400 pounds of spare parts, equipment and supplies that will sustain station operations for the next year. STS-135 was the 33rd and final flight for Atlantis, which has spent 307 days in space, orbited Earth 4,848 times and traveled 125,935,769 miles, and also the final mission of the Space Shuttle Program. For more information, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts135/index.html. Photo credit: NASA/Kim Shiflett
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh.
For program year 1996-97, 222,639 North Carolina (NC) 9th-12th graders were enrolled in Workforce Development Education (WDE). Twenty-five curriculum products were developed, 34 course blueprints were revised to reflect business/industry practices and state/national standards, and about 3,600 business/industry personnel participated in WDE…
Ilahi, Ikram; Yousafzai, Ali Muhammad
2017-11-01
The present research is aimed to investigate the susceptibility of Cx. quinquefasciatus larvae (2nd and 4th instars), pupae and adults during exposure to various concentrations of C. nardus n-hexane extract. Increase in mortality of larvae and pupae was observed with increase in concentration of the extract solution (R2>0.90). LC50 values of extract for 2nd and 4th instar larvae were 451.8 and 599.6 ppm, respectively. The LC
2017-11-15
This major final rule addresses changes to the Medicare physician fee schedule (PFS) and other Medicare Part B payment policies such as changes to the Medicare Shared Savings Program, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. In addition, this final rule includes policies necessary to begin offering the expanded Medicare Diabetes Prevention Program model.
Claims Procedure for Plans Providing Disability Benefits. Final rule.
2016-12-19
This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.
ERIC Educational Resources Information Center
Viti, Lynne Spigelmire
Writing 125 is a 13-week course that all first-year students at Wellesley College (Massachusetts) are required to take. One instructor teaches a section of it called "Law in Contemporary Society" which centers writing and reading activities around legal issues, namely "Roe v. Wade" and "Webster v. Cruzan." As an…
Corps of Engineers Hydraulic Design Criteria. Volume I
1977-01-01
DESIGN CRITERIA CLASSIFICATION INDEX S000-GENERAL 000 Physical Constants 001 Fluid Properties 010 Open Channel Flow 020 Free Overflow 030 Pressure Flow...Dissipation 113 Erosion below Spillways 120 Chute Spillways 121 Approach Channel 122 Ogee Crests 123 Spillay Chutes S ii124 Spillway Stilling Basins 125...Spillvay Exit Channel Revised 5-59 .. . j1.I.i edCORPS OF ENGINEERS HYDRAULIC DESIGN CRITERIA CLASSIFICATION INDEX (Continued) %. IO0-SPILLWAYS
Investigating the impact of automated feedback on students' scientific argumentation
NASA Astrophysics Data System (ADS)
Zhu, Mengxiao; Lee, Hee-Sun; Wang, Ting; Liu, Ou Lydia; Belur, Vinetha; Pallant, Amy
2017-08-01
This study investigates the role of automated scoring and feedback in supporting students' construction of written scientific arguments while learning about factors that affect climate change in the classroom. The automated scoring and feedback technology was integrated into an online module. Students' written scientific argumentation occurred when they responded to structured argumentation prompts. After submitting the open-ended responses, students received scores generated by a scoring engine and written feedback associated with the scores in real-time. Using the log data that recorded argumentation scores as well as argument submission and revisions activities, we answer three research questions. First, how students behaved after receiving the feedback; second, whether and how students' revisions improved their argumentation scores; and third, did item difficulties shift with the availability of the automated feedback. Results showed that the majority of students (77%) made revisions after receiving the feedback, and students with higher initial scores were more likely to revise their responses. Students who revised had significantly higher final scores than those who did not, and each revision was associated with an average increase of 0.55 on the final scores. Analysis on item difficulty shifts showed that written scientific argumentation became easier after students used the automated feedback.
von Koss Torkildsen, Janne; Morken, Frøydis; Helland, Wenche A; Helland, Turid
In this study of third grade school children, we investigated the association between writing process measures recorded with key stroke logging and the final written product. Moreover, we examined the cognitive predictors of writing process and product measures. Analyses of key strokes showed that while most children spontaneously made local online revisions while writing, few revised previously written text. Children with good reading and spelling abilities made more online revisions than their peers. Two process factors, transcription fluency and online revision activity, contributed to explaining variance in narrative macrostructural quality and story length. As for cognitive predictors, spelling was the only factor that gave a unique contribution to explaining variance in writing process factors. Better spelling was associated with more revisions and faster transcription. The results show that developing writers' ability to make online revisions in creative writing tasks is related to both the quality of the final written product and to individual literacy skills. More generally, the findings indicate that investigations of the dynamics of the writing process may provide insights into the factors that contribute to creative writing during early stages of literacy.
The Radio Sky and the Echo of Creation.
ERIC Educational Resources Information Center
Ferris, Timothy
1984-01-01
Presents a selection from a revised and updated version of "The Red Limit" by Timothy Ferris. The book is a completely nontechnical introduction to 20th century cosmology, the study of the large-scale properties of the universe. (JN)
CSAPR Direct Final Rule (77 FR 10342)
EPA takes direct final action on additional revisions to the final Transport Rule (Federal Implementation Plans: Interstate Transport of Fine Particulate Matter and Ozone and Correction of SIP Approvals published August 8, 2011).
Special Consolidated Checklists for Organic Air Emission Standards
This checklist consolidates changes made to the Federal code by the December 6, 1994 final rule regarding Subpart CC standards [(59 FR 62896); Revision Checklist 154] and subsequent revisions which have occurred through December 31, 2002.
Construction records study : final report.
DOT National Transportation Integrated Search
1975-09-01
The purpose of this study was to determine the extent of change and revision necessary for efficient record keeping and to revise the record keeping process in the field, eliminating irrelevant entries. This study attempted to standardize field recor...
75 FR 16229 - Urbanized Area Formula Program: Notice of Final Circular
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-31
... revision. A. Chapter I--Introduction and Background Chapter I of the revised circular is the introductory... comprehensive fleet age and condition statistics are necessary for FTA to estimate fleet condition on a national...
Zvada, Simbarashe P; Denti, Paolo; Donald, Peter R; Schaaf, H Simon; Thee, Stephanie; Seddon, James A; Seifart, Heiner I; Smith, Peter J; McIlleron, Helen M; Simonsson, Ulrika S H
2014-05-01
To describe the population pharmacokinetics of rifampicin, pyrazinamide and isoniazid in children and evaluate the adequacy of steady-state exposures. We used previously published data for 76 South African children with tuberculosis to describe the population pharmacokinetics of rifampicin, pyrazinamide and isoniazid. Monte Carlo simulations were used to predict steady-state exposures in children following doses in fixed-dose combination tablets in accordance with the revised guidelines. Reference exposures were derived from an ethnically similar adult population with tuberculosis taking currently recommended doses. The final models included allometric scaling of clearance and volume of distribution using body weight. Maturation was included for clearance of isoniazid and clearance and absorption transit time of rifampicin. For a 2-year-old child weighing 12.5 kg, the estimated typical oral clearances of rifampicin and pyrazinamide were 8.15 and 1.08 L/h, respectively. Isoniazid typical oral clearance (adjusted for bioavailability) was predicted to be 4.44, 11.6 and 14.6 L/h for slow, intermediate and fast acetylators, respectively. Higher oral clearance values in intermediate and fast acetylators also resulted from 23% lower bioavailability compared with slow acetylators. Simulations based on our models suggest that with the new WHO dosing guidelines and utilizing available paediatric fixed-dose combinations, children will receive adequate rifampicin exposures when compared with adults, but with a larger degree of variability. However, pyrazinamide and isoniazid exposures in many children will be lower than in adults. Further studies are needed to confirm these findings in children administered the revised dosages and to optimize pragmatic approaches to dosing.
Tanno, L K; Calderon, M A; Goldberg, B J; Gayraud, J; Bircher, A J; Casale, T; Li, J; Sanchez-Borges, M; Rosenwasser, L J; Pawankar, R; Papadopoulos, N G; Demoly, P
2015-06-01
The global allergy community strongly believes that the 11th revision of the International Classification of Diseases (ICD-11) offers a unique opportunity to improve the classification and coding of hypersensitivity/allergic diseases via inclusion of a specific chapter dedicated to this disease area to facilitate epidemiological studies, as well as to evaluate the true size of the allergy epidemic. In this context, an international collaboration has decided to revise the classification of hypersensitivity/allergic diseases and to validate it for ICD-11 by crowdsourcing the allergist community. After careful comparison between ICD-10 and 11 beta phase linearization codes, we identified gaps and trade-offs allowing us to construct a classification proposal, which was sent to the European Academy of Allergy and Clinical Immunology (EAACI) sections, interest groups, executive committee as well as the World Allergy Organization (WAO), and American Academy of Allergy Asthma and Immunology (AAAAI) leaderships. The crowdsourcing process produced comments from 50 of 171 members contacted by e-mail. The classification proposal has also been discussed at face-to-face meetings with experts of EAACI sections and interest groups and presented in a number of business meetings during the 2014 EAACI annual congress in Copenhagen. As a result, a high-level complex structure of classification for hypersensitivity/allergic diseases has been constructed. The model proposed has been presented to the WHO groups in charge of the ICD revision. The international collaboration of allergy experts appreciates bilateral discussion and aims to get endorsement of their proposals for the final ICD-11. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Dissolution behaviour of 238U, 234U and 230Th deposited on filters from personal dosemeters.
Becková, Vera; Malátová, Irena
2008-01-01
Kinetics of dissolution of (238)U, (234)U and (230)Th dust deposited on filters from personal alpha dosemeters was studied by means of a 26-d in vitro dissolution test with a serum ultrafiltrate simulant. Dosemeters had been used by miners at the uranium mine 'Dolní Rozínka' at Rozná, Czech Republic. The sampling flow-rate as declared by the producer is 4 l h(-1) and the sampling period is typically 1 month. Studied filters contained 125 +/- 6 mBq (238)U in equilibrium with (234)U and (230)Th; no (232)Th series nuclides were found. Half-time of rapid dissolution of 1.4 d for (238)U and (234)U and slow dissolution half-times of 173 and 116 d were found for (238)U and (234)U, respectively. No detectable dissolution of (230)Th was found.
A resolution commemorating the 125th anniversary of North Dakota's Statehood.
Sen. Hoeven, John [R-ND
2014-07-29
Senate - 07/29/2014 Submitted in the Senate, considered, and agreed to without amendment and with a preamble by Unanimous Consent. (All Actions) Tracker: This bill has the status Agreed to in SenateHere are the steps for Status of Legislation:
Federal Policy for the Protection of Human Subjects. Final rule.
2017-01-19
The departments and agencies listed in this document announce revisions to modernize, strengthen, and make more effective the Federal Policy for the Protection of Human Subjects that was originally promulgated as a Common Rule in 1991. This final rule is intended to better protect human subjects involved in research, while facilitating valuable research and reducing burden, delay, and ambiguity for investigators. These revisions are an effort to modernize, simplify, and enhance the current system of oversight.
STS-125 MS5 Feustel during EVA5
2009-05-18
S125-E-010049 (18 May 2009) --- Astronaut Andrew Feustel, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Feustel and astronaut John Grunsfeld (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics. Astronaut Megan McArthur, STS-125 mission specialist, at the controls of the remote manipulator system (RMS), can be seen through an aft flight deck window.
State of California; Sacramento Metropolitan AQMD; Approval of Air Plan Revisions; VOC Emissions
EPA is taking final action to approve a revision to the Sacramento Metropolitan AQMD portion of the California State Implementation Plan (SIP), concerning volatile organic compound (VOC) emissions from Organic Chemical Manufacturing Operations.
Some New Hypotheses Concerning Word Families in Chinese
ERIC Educational Resources Information Center
Pulleyblank, E. G.
1973-01-01
Revised version of a paper entitled Word Families in Chinese: A Reconsideration'' presented at the 28th International Congress of Orientalists, Canberra, Australia, January 1971, and published in preprint form in Unicorn'' n9 p1-19 Jan 1972. (VM)
IRIS Toxicological Review of Methanol (Noncancer) (Revised External Review Draft)
EPA is seeking additional public comment and external peer review of the scientific basis supporting the human health hazard and dose-response assessment of methanol (noncancer).
STS-125 MS3 Grunsfeld and MS5 Feustel during EVA5
2009-05-18
S125-E-009706 (18 May 2009) --- Astronauts John Grunsfeld (left) and Andrew Feustel, both STS-125 mission specialists, participate in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and Feustel installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS5 Feustel during EVA5
2009-05-18
S125-E-010047 (18 May 2009) --- Astronaut Andrew Feustel, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Feustel and astronaut John Grunsfeld (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009599 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009688 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009595 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009591 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009717 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS5 Feustel during EVA5
2009-05-18
S125-E-009877 (18 May 2009) --- Astronaut Andrew Feustel, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Feustel and astronaut John Grunsfeld (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld and MS5 Feustel during EVA5
2009-05-18
S125-E-009667 (18 May 2009) --- Astronauts John Grunsfeld (left) and Andrew Feustel, both STS-125 mission specialists, participate in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and Feustel installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld and MS5 Feustel during EVA5
2009-05-18
S125-E-009603 (18 May 2009) --- Astronauts John Grunsfeld (left) and Andrew Feustel, both STS-125 mission specialists, participate in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and Feustel installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009696 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
STS-125 MS3 Grunsfeld during EVA5
2009-05-18
S125-E-009593 (18 May 2009) --- Astronaut John Grunsfeld, STS-125 mission specialist, participates in the mission?s fifth and final session of extravehicular activity (EVA) as work continues to refurbish and upgrade the Hubble Space Telescope. During the seven-hour and two-minute spacewalk, Grunsfeld and astronaut Andrew Feustel (out of frame), mission specialist, installed a battery group replacement, removed and replaced a Fine Guidance Sensor and three thermal blankets (NOBL) protecting Hubble?s electronics.
Tavakoli, Maryam; Jeddi-Tehrani, Mahmood; Salek-Moghaddam, Alireza; Rajaei, Samira; Mohammadzadeh, Afsaneh; Sheikhhasani, Shahrzad; Kazemi-Sefat, Golnaz-Ensieh; Zarnani, Amir Hassan
2011-09-01
To investigate immunomodulatory effect of 1,25(OH)2 vitamin D3 (1,25(OH)2D3) on cytokine production by endometrial cells of women with unexplained recurrent spontaneous abortion (URSA). In vitro study. Academic research center. Patients with URSA and healthy controls. Treatment with 1,25(OH)2D3. Production of interferon γ (IFN-γ), interleukin-10 (IL-10), transforming growth factor β (TGF-β), IL-17, IL-6, and IL-8 by whole endometrial cells (WECs) and endometrial stromal cells in the presence and absence of 1,25(OH)2D3 and 1α-hydroxylase activity of these cell populations were measured in patients with URSA and healthy controls. 1,25(OH)2D3 interfered with production of cytokines by WECs of the control and URSA groups, except IL-8 which was increased in URSA group. In endometrial stromal cells, 1,25(OH)2D3 down-regulated cytokine production as well with stimulatory effect on the production of TGF-β in patients with URSA. Cytokine profile of WECs from patients with URSA skewed toward TH2 phenotype after treatment with 1,25(OH)2D3. Endometrial cells of both groups had comparable capacity to produce 1,25(OH)2D3. Considering the complex network of immunoregulation at the fetomaternal interface, potential beneficial effects of vitamin D3 in patients with URSA need to be investigated in clinical practice. Comparable levels of 1,25(OH)2D3 production and similar trend of cytokine expression by WECs of URSA and control groups after vitamin D3 treatment reflect the same local metabolic machinery of this hormone. Copyright © 2011 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.
Keeping a Dream Alive: Cooper Union Library.
ERIC Educational Resources Information Center
Iwan, Irene
1984-01-01
Profiles the Cooper Union Library, a private academic library specializing in architecture, art, and engineering that celebrated its 125th anniversary in fall 1984. Highlights include a biographical sketch of the college's founder, Peter Cooper; construction of the building; curriculum changes; library services and materials; and cooperative and…
A resolution celebrating the 125th anniversary of the State of South Dakota.
Sen. Thune, John [R-SD
2014-09-18
Senate - 09/18/2014 Submitted in the Senate, considered, and agreed to without amendment and with a preamble by Unanimous Consent. (All Actions) Tracker: This bill has the status Agreed to in SenateHere are the steps for Status of Legislation:
Effect of body mass index on functional outcomes following arthroplasty procedures.
Polat, Gokhan; Ceylan, Hasan Huseyin; Sayar, Safak; Kucukdurmaz, Fatih; Erdil, Mehmet; Tuncay, Ibrahim
2015-12-18
To evaluate the body mass index (BMI) change in arthroplasty patients and its impact on the patients' functional results. Between October 2010 and May 2013, 606 patients who were operated due to gonarthrosis, coxarthrosis, aseptic loosening of the total knee and hip prosthesis were evaluated prospectively. Patients were operated by three surgeons in three medical centers. Patients who were between 30-90 years of age and who were underwent total knee arthroplasty, total hip arthroplasty, revision knee arthroplasty, or revision hip arthroplasty were included in the study. We excluded the patients who cannot tolerate our standard postoperative rehabilitation program. Additionally, patients who had systemic inflammatory diseases, diabetes mellitus, or endochrinopathies were excluded from the study. The remaining 513 patients comprised our study group. Preoperative functional joint scores, height, weight and BMI of all patients were recorded. We used the Knee Society Score (KSS) for knee and Harris Hip Score (HHS) for hip patients. Postoperative functional scores were measured at 1(st), 6(th) and 12(th) months and recorded separately at outpatient visits. The mean age of the patients was 64.7 (range: 30-90) years (207 males/306 females) and the mean follow-up duration was 14.3 (range: 12-26) mo. We found that arthroplasty patients had weight gain and had an increase in BMI at the postoperative 1(st), 6(th) and 12(th) months. The mean BMI of the patients was 27.7 preoperatively, 27.8 at the postoperative 1(st) month, 28.1 at the 6(th) month and 28.6 at the 12(th) month (P < 0.01). At the last visit, the mean postoperative HHS of the hip arthroplasty patients was 82.2 ± 7.12 (preoperatively, 52.3; 1(st) month, 78.2; 6(th) month, 81.1; 12(th) month, 82.2), and the mean KSS of the knee arthroplasty patients was 79.3 ± 4.31 (preoperatively, 35.8; 1(st) month, 75.2; 6(th) month, 79.1; 12(th) month, 79.3). Worse functional results were noted in the patients who had a BMI increase, however, this correlation was statistically significant only at the postoperative 6(th) month (P = 0.03). To prevent the negative functional effects of this weight gain during the postoperative period, arthroplasty patients should be advised for weight control and risky patients should consult with a dietician.
Direct Final Rule for Heavy-Duty Highway Program: Revisions for Emergency Vehicles
Revises the heavy-duty diesel regulations to enable emergency vehicles to perform mission-critical life-saving work without risking that abnormal conditions of the emission control system could lead to decreased engine power, speed or torque.
DOT National Transportation Integrated Search
2007-02-14
This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...
EPA is taking final action to approve a revision to the Northern Sierra Air Quality Management District (NSAQMD) portion of the California SIP concerning emissions of particulate matter (PM) from wood burning devices.
Coding update of the SMFM definition of low risk for cesarean delivery from ICD-9-CM to ICD-10-CM.
Armstrong, Joanne; McDermott, Patricia; Saade, George R; Srinivas, Sindhu K
2017-07-01
In 2015, the Society for Maternal-Fetal Medicine developed a low risk for cesarean delivery definition based on administrative claims-based diagnosis codes described by the International Classification of Diseases, Ninth Revision, Clinical Modification. The Society for Maternal-Fetal Medicine definition is a clinical enrichment of 2 available measures from the Joint Commission and the Agency for Healthcare Research and Quality measures. The Society for Maternal-Fetal Medicine measure excludes diagnosis codes that represent clinically relevant risk factors that are absolute or relative contraindications to vaginal birth while retaining diagnosis codes such as labor disorders that are discretionary risk factors for cesarean delivery. The introduction of the International Statistical Classification of Diseases, 10th Revision, Clinical Modification in October 2015 expanded the number of available diagnosis codes and enabled a greater depth and breadth of clinical description. These coding improvements further enhance the clinical validity of the Society for Maternal-Fetal Medicine definition and its potential utility in tracking progress toward the goal of safely lowering the US cesarean delivery rate. This report updates the Society for Maternal-Fetal Medicine definition of low risk for cesarean delivery using International Statistical Classification of Diseases, 10th Revision, Clinical Modification coding. Copyright © 2017. Published by Elsevier Inc.