Science.gov

Sample records for richland operations doe-rl

  1. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    SciTech Connect

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  2. Richland Operations Office technology summary

    SciTech Connect

    Not Available

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  3. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    SciTech Connect

    Not Available

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  4. DOE/RL Hanford Site Air Operating Permit Annual Compliance Certification Report for the Period July 2 2001 through December 31 2001 [SEC 1 & 2

    SciTech Connect

    GREEN, W.E.

    2002-05-22

    The Hanford Site Air Operating Permit (AOP), Number 00-05-006, became effective on July 2, 2001. The AOP, Section 4.3.4, ''Annual Compliance Certification'', requires submittal of an annual compliance certification report no later than 12 months following the effective date of the permit. This report is to be certified for truth, accuracy, and completeness by a Responsible Official. This first annual compliance certification report contains information for the period from July 2, 2001 through December 31, 2001. Hereafter, the annual compliance certification report will contain information for the period from January 1 through December 31, as required by the AOP Section 4.3, ''Submittals''. Copies of the annual compliance certification reports are transmitted to the Washington State Department of Ecology (Ecology), the Washington State Department of Health (WDOH), the Benton Clean Air Authority (BCAA), and the U.S. Environmental Protection Agency (EPA), Region 10. For the applicable reporting period, Section 4.3.3, ''Annual Compliance Certification'', requires the following content for the annual compliance certification report: (1) The identification of each term or condition of the permit that is the basis of the certification; (2) The compliance status; (3) Whether compliance was continuous or intermittent; (4) The method(s) used to determine the compliance status of the source over the reporting period consistent with Washington Administrative Code (WAC) 173401 -61 5(3)(a); and (5) Such other facts as Ecology, WDOH, or BCAA might be required to determine the compliance status of the source. According to WAC 173-401-630(5), no certification is required for insignificant emission units. The specific terms and conditions for this annual compliance certification report consist of all emission point specific terms and conditions contained in the AOP Attachment 1 and Attachment 2 tables, plus Attachment 3 for asbestos and open burning.

  5. Environmental Assessment and Finding of No Significant Impact: Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    2002-03-22

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) needs to improve management of post-1970, contact-handled (CH) suspect transuranic (TRU) waste containers (primarily drums) that are stacked in modules and covered with soil in the Low-Level Burial Grounds (LLBG).

  6. DOE-RL Integrated Safety Management System Program Description

    SciTech Connect

    SHOOP, D.S.

    2000-06-29

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight.

  7. DOE-RL Integrated Safety Management System Description

    SciTech Connect

    SHOOP, D.S.

    2000-09-01

    The purpose of this Integrated Safety Management System Description (ISMSD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This ISMSD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this ISMSD contains some information on contractor processes and procedures which then require RL approval or oversight. This ISMSD does not purport to contain a full description of the contractors' ISM System Descriptions.

  8. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    SciTech Connect

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  9. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  10. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  11. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    SciTech Connect

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  12. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    SciTech Connect

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  13. Petition to Object to Department of Energy's Hanford Site, Richland, Washington, Title V Operating Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  14. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  15. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    SciTech Connect

    Gerton, R.E.

    1997-07-25

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board`s investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63).

  16. 11. Building Layout, 185189 D, U.S. Atomic Energy Commission, Richland ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Building Layout, 185-189 D, U.S. Atomic Energy Commission, Richland Operations Office, Dwg. No. H-1-14844, 1957. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  17. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  18. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  19. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  20. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    SciTech Connect

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  1. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  2. Environmental Management Performance Report 11/1999

    SciTech Connect

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  3. World Languages at Richland College.

    ERIC Educational Resources Information Center

    Mittelstet, Stephen K.

    1999-01-01

    Describes how Richland College, Texas, created a division of world languages to address the contemporary language acquisition of an increasingly diverse student body, noting the importance of today's students studying languages to prepare for tomorrow's global marketplace. The paper discusses changing student markets, fiscal support and staffing…

  4. RICHLAND CREEK ROADLESS AREA, ARKANSAS.

    USGS Publications Warehouse

    Miller, Mary H.; Wood, Robert H.

    1984-01-01

    On the basis of geologic and mineral surveys, Richland Creek Roadless Area, Arkanses, has little promise for the occurrence of metallic mineral resources, gas and oil, or oil shale. The Boone Formation of Mississippian age and the Everton Formation of Ordovician age, both known to contain zinc and lead deposits in northern Arkansas, underlie the roadless area. The presence or absence of zinc and lead deposits in these formations in the subsurface can be neither confirmed nor ruled out without exploratory drilling. Most of the Richland Creek Roadless Area is under lease for oil and gas; however two wells drilled near the eastern boundary of the area did not show contained gas or oil.

  5. Request for interim approval to operate Trench 94 of the 218-E-12B Burial Ground as a chemical waste landfill for disposal of polychlorinated biphenyl waste in submarine reactor compartments. Revision 2

    SciTech Connect

    Cummins, G.D.

    1994-06-01

    This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of this waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy`s (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS.

  6. Richland Community College BioEnergy Program

    SciTech Connect

    Brauer, Douglas C.

    2012-09-25

    The purpose of this project was to focus on education and community outreach. As such, it reflected anticipated growth in the renewable/alternative energy industry creating a vast need for trained industry professionals, engineers, operations managers, and technicians to operate state-of-the art production facilities. This project's scope leveraged Richland's initial entry in the renewable energy education, which included Associate of Applied Science degrees and certificates in biofuels and bioprocessing. This facilitated establishing a more comprehensive sustainability and renewable energy programs including experiential learning laboratory components needed to support new renewable energy education degree and certificate specialties, as well as community outreach. Renewable energy technologies addressed included: a) biodiesel, c) biomass, d) wind, e) geothermal, and f) solar. The objective is to provide increasingly innovative hands on experiential learning and knowledge transfer opportunities.

  7. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    SciTech Connect

    Not Available

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  8. 300 Area Process Trenches Supplemental Information to the Hanford Contingency Plan (DOE/RL-93-75)

    SciTech Connect

    R.A. Carlson

    1997-12-31

    The 300 Area Process Trenches are surface impoundments which were used to receive routine discharges of nonregulated process cooling water from operations in the 300 Area and dangerous waste from several research and development laboratories and the 300 Area Fuels Fabrication process. Discharges to the trenches ceased in 1994, and they were physically isolated in 1995. Remediation of the trenches is scheduled to begin during July 1997. Currently, there are no waste management activities required at the 300 Area Process Trenches and the unit does not present any significant hazards to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 300 Area Process Trenches, however, during remediation, exposure, spill, fire, and industrial hazards will exist. This contingency plan addresses the emergency organization, equipment and evacuation routes pertinent to the process trenches during remediation

  9. Program desk manual for occupational safety and health -- U.S. Department of Energy Richland Operations, Office of Environment Safety and Health

    SciTech Connect

    Musen, L.G.

    1998-08-27

    The format of this manual is designed to make this valuable information easily accessible to the user as well as enjoyable to read. Each chapter contains common information such as Purpose, Scope, Policy and References, as well as information unique to the topic at hand. This manual can also be provided on a CD or Hanford Internet. Major topics include: Organization and program for operational safety; Occupational medicine; Construction and demolition; Material handling and storage; Hoisting and rigging; Explosives; Chemical hazards; Gas cylinders; Electrical; Boiler and pressure vessels; Industrial fire protection; Industrial hygiene; and Safety inspection checklist.

  10. Environmental Management Performance Report July 2000

    SciTech Connect

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  11. Funds control for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    Per contract modification between the Department of Energy Richland Operations Office (DOE-RL) and FDH. FDH must capture, control and monitor costs based on control points dictate in the Management Contract.

  12. Annual Status Report (FY2013 Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2014-03-25

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, 3 Chg. 11, and as implemented by DOE/RL-2000-29, Rev. 22, the DOE Richland Operations 4 Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis 5 for fiscal year (FY) 2013.

  13. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  14. RICHLAND CREEK WILDERNESS STUDY AREA, ARKANSAS.

    USGS Publications Warehouse

    Haley, Boyd R.; Stroud, Raymond B.

    1984-01-01

    The Richland Creek Wilderness Study Area covers an area of about 5 sq mi in parts of Newton and Searcy Counties, Arkansas. Geochemical studies of the outcropping rocks and stream sediments in the study area indicate that these rocks have little promise for the occurrence of metallic mineral resources. There is little promise for the occurrence of natural gas within the area because the Pennsylvanian age rocks have been breached by erosion and the other potential reservoir rocks were reported as dry. Some of the sandstone and limestone could be used for commercial purposes.

  15. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  16. 78 FR 16713 - Board Meeting; April 16, 2013; Richland, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR WASTE TECHNICAL REVIEW BOARD Board Meeting; April 16, 2013; Richland, WA The U.S. Nuclear Waste Technical Review Board... meeting will be held at the Marriott Courtyard, 480 Columbia Point Drive, Richland, WA 99352; Tel 509-942...

  17. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    2001-10-10

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites.

  18. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumed to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely.

  19. RadNet Air Data From Richland, WA

    EPA Pesticide Factsheets

    This page presents radiation air monitoring and air filter analysis data for Richland, WA from EPA's RadNet system. RadNet is a nationwide network of monitoring stations that measure radiation in air, drinking water and precipitation.

  20. Recharge to the North Richland well field

    SciTech Connect

    Law, A.G.

    1989-07-01

    The investigation was based on a preliminary ground-water flow model of the 1100 Area. Because few local data were available for this effort, an existing regional ground-water flow model of the Hanford Site was applied, which is based on the Variable Thickness Transient (VTT) ground-water flow code (Kipp et al., 1976). A submodel of the Hanford Site model was developed based on the VTT code. An independent model consisting of a simple representation of the local conditions in the vicinity of the North Richland well field was also used in the investigation. This model, based on the MODFLOW code (McDonald and Harbaugh, 1984), was used in a series of transient simulations to examine dynamic aspects of the well field/recharge basin. Results from this simple model also provide an independent, qualitative check of results produced with the 1100 Area model based on the VTT code. This report summarizes the 1100 Area modeling investigation, including the approach used to generate results for the regional and 1100 Area VTT models, the approach used in the transient MODFLOW model, results from some initial steady-state and transient simulations with the submodel and the MODFLOW models, and resulting conclusions and recommendations. Because local data were lacking to develop and calibrate the models, the investigation described in this report can best be described as a ''sensitivity analysis'' of ground-water flow in the 1100 Area. 4 refs., 10 figs., 2 tabs.

  1. Surficial geology of Richland Quadrangle, Oswego County, New York

    USGS Publications Warehouse

    Miller, Todd S.

    1980-01-01

    The location and extent of 12 kinds of surficial deposits in Richland quadrangle, Oswego County, N.Y., are mapped on a 7.5-minute U.S. Geological Survey topographic map. The map was compiled to indicate the lithology potential for ground-water development at any specific location. (USGS)

  2. Annual Energy Consumption Analysis Report for Richland Middle School

    SciTech Connect

    Liu, Bing

    2003-12-18

    Richland Middle School is a single story, 90,000 square feet new school located in Richland, WA. The design team proposed four HVAC system options to serve the building. The proposed HVAC systems are listed as following: (1) 4-pipe fan coil units served by electrical chiller and gas-fired boilers, (2) Ground-source closed water loop heat pumps with water loop heat pumps with boiler and cooling tower, and (3) VAV system served by electrical chiller and gas-fired boiler. This analysis estimates the annual energy consumptions and costs of each system option, in order to provide the design team with a reasonable basis for determining which system is most life-cycle cost effective. eQuest (version 3.37), a computer-based energy simulation program that uses the DOE-2 simulation engine, was used to estimate the annual energy costs.

  3. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this...

  4. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this regulation...

  5. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this regulation...

  6. 33 CFR 100.1305 - Richland, Washington, west coast outboard championship hydro races.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Richland, Washington, west coast outboard championship hydro races. 100.1305 Section 100.1305 Navigation and Navigable Waters COAST GUARD... Richland, Washington, west coast outboard championship hydro races. (a) Regulated area. By this regulation...

  7. 78 FR 37222 - Columbia Organic Chemical Company Site, Columbia, Richland County, South Carolina; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... AGENCY Columbia Organic Chemical Company Site, Columbia, Richland County, South Carolina; Notice of... Columbia Organic Chemical Company Superfund Site located in Columbia, Richland County, South Carolina. The.... Submit your comments by site name Columbia Organic Chemical Company by one of the following methods:...

  8. Annual Status Report (FY2015) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2016-03-24

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, and as implemented by DOE/RL-2000-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2015.

  9. Annual Status Report (FY2104) Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2015-03-24

    In accordance with U.S. Department of Energy requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annul summary of the Hanford Site Composite Analysis for fiscal year 2014.

  10. 300 Area process sewer piping upgrade and 300 Area treated effluent disposal facility discharge to the City of Richland Sewage System, Hanford Site, Richland, Washington

    SciTech Connect

    1995-05-01

    The U.S. Department of Energy (DOE) is proposing to upgrade the existing 300 Area Process Sewer System by constructing and operating a new process sewer collection system that would discharge to the 300 Area Treated Effluent Disposal Facility. The DOE is also considering the construction of a tie-line from the TEDF to the 300 Area Sanitary Sewer for discharging the process wastewater to the City of Richland Sewage System. The proposed action is needed because the integrity of the old piping in the existing 300 Area Process Sewer System is questionable and effluents might be entering the soil column from leaking pipes. In addition, the DOE has identified a need to reduce anticipated operating costs at the new TEDF. The 300 Area Process Sewer Piping Upgrade (Project L-070) is estimated to cost approximately $9.9 million. The proposed work would involve the construction and operation of a new process sewer collection system. The new system would discharge the effluents to a collection sump and lift station for the TEDF. The TEDF is designed to treat and discharge the process effluent to the Columbia River. The process waste liquid effluent is currently well below the DOE requirements for radiological secondary containment and is not considered a RCRA hazardous waste or a State of Washington Hazardous Waste Management Act dangerous waste. A National Pollutant Discharge Elimination, System (NPDES) permit has been obtained from the U.S. Environmental Protection Agency for discharge to the Columbia River. The proposed action would upgrade the existing 300 Area Process Sewer System by the construction and operation of a new combined gravity, vacuum, and pressurized process sewer collection system consisting of vacuum collection sumps, pressure pump stations, and buried polyvinyl chloride or similar pipe. Two buildings would also be built to house a main collection station and a satellite collection station.

  11. Management control system description

    SciTech Connect

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  12. Sludge stabilization at the Plutonium Finishing Plant, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-10-01

    This Environmental Assessment evaluates the proposed action to operate two laboratory-size muffle furnaces in glovebox HC-21C, located in the Plutonium Finishing Plant (PFP), Hanford Site, Richland, Washington. The muffle furnaces would be used to stabilize chemically reactive sludges that contain approximately 25 kilograms (55 pounds) of plutonium by heating to approximately 500 to 1000{degrees}C (900 to 1800{degrees}F). The resulting stable powder, mostly plutonium oxide with impurities, would be stored in the PFP vaults. The presence of chemically reactive plutonium-bearing sludges in the process gloveboxes poses a risk to workers from radiation exposure and limits the availability of storage space for future plant cleanup. Therefore, there is a need to stabilize the material into a form suitable for long-term storage. This proposed action would be an interim action, which would take place prior to completion of an Environmental Impact Statement for the PFP which would evaluate stabilization of all plutonium-bearing materials and cleanout of the facility. However, only 10 percent of the total quantity of plutonium in reactive materials is in the sludges, so this action will not limit the choice of reasonable alternatives or prejudice the Record of Decision of the Plutonium Finishing Plant Environmental Impact Statement.

  13. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy`s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed.

  14. Soil washing physical separations test procedure - 300-FF-1 operable unit

    SciTech Connect

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  15. Annual Status Report (FY2010) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2011-01-11

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1 Chg 1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office (DOE-RL), also known as RL, has prepared this annual status report for fiscal year (FY) 2010 of PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  16. Annual Status Report (Fiscal Year 2012) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2012-12-27

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, Chg. 1,1 and as implemented by DOE/RL-2000-29, Rev. 2,2 the DOE Richland Operations Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year (FY) 2012, as originally reported in PNNL-118003 and PNNL-11800, Addendum 14 (hereafter these reports are referred to collectively as the Composite Analysis), and to address secondary issues identified during the review of the Composite Analysis.

  17. 76 FR 51023 - Richland-Stryker Generation LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Richland-Stryker Generation LLC; Supplemental Notice That Initial Market... in the above-referenced proceeding of Richland-Stryker Generation LLC's application for...

  18. Environmental Management Performance Report to DOE-RL December 2000

    SciTech Connect

    EDER, D.M.

    2000-12-01

    This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures, and safety data is current as of October 31. Accomplishments, Issues and Integration items are current as of November 17 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2001 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

  19. Code of accounts, management overview volume: Richland environmental restoration. Revision 4

    SciTech Connect

    Hajner, R.S.

    2000-01-19

    This document contains the code of accounts volume for the Richland Environmental Restoration Project. Contents include: Total ERC work category, Work location listing, Standard work activity, Work activity definitions, Code of Account trees, the Code of Accounts, Netscape instructions, Setup of charge codes, and Distribution.

  20. 200-BP-5 operable unit treatability test report

    SciTech Connect

    1996-04-01

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites.

  1. Hanford Site Anuran Monitoring Report for Calendar Year 2013

    SciTech Connect

    Wilde, Justin W.; Johnson, Scott J.; Lindsey, Cole T.

    2014-02-13

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  2. Hanford Reach Fall Chinook Redd Monitoring Report for Calendar Year 2013

    SciTech Connect

    Lindsey, Cole T.; Nugent, John J.

    2014-02-10

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  3. Hanford Site Black-Tailed Jackrabbit Monitoring Report for Fiscal Year 2013

    SciTech Connect

    Lindsey, Cole T.; Nugent, John J.; Wilde, Justin W.; Johnson, Scott J.

    2014-02-13

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  4. Hanford Site Raptor Nest Monitoring Report for Calendar Year 2013

    SciTech Connect

    Nugent, John J.; Lindsey, Cole T.; Wilde, Justin W.

    2014-02-13

    The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at Hanford required for decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Hanford Site Comprehensive Land Use Plan (CLUP, DOE/EIS-0222-F) which is the Environmental Impact Statement for Hanford Site activities, helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with NEPA.

  5. Annual Status Report (Fiscal Year 2011) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2012-03-12

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1 Chg 11, and as implemented by DOE/RL-2000-29, Rev. 22, the DOE Richland Operations Office (DOE-RL) has prepared this annual summary of the composite analysis for fiscal year (FY) 2011 as originally reported in PNNL-118003 (henceforth referred to as the Composite Analysis). The main emphasis of DOE/RL-2000-29, Rev. 2 is to identify additional data and information to enhance the Composite Analysis and the subsequent PNNL-11800 Addendum 14 (hereinafter referred to as the Addendum), and to address secondary issues identified during the review of the Composite Analysis.

  6. Alternative Energy Saving Technology Analysis Report for Richland High School Renovation Project

    SciTech Connect

    Liu, Bing

    2004-08-09

    On July 8, 2004, L&S Engineering, Inc. submitted a technical assistance request to Pacific Northwest National Laboratory (PNNL) to help estimate the potential energy savings and cost effectiveness of the solar energy and daylighting design alternatives for Richland High School Renovation Project in Richland, WA. L&S Engineering expected PNNL to evaluate the potential energy savings and energy cost savings, the probable installation costs, incentives or grants to reduce the installed costs and simple payback for the following alternative measures: (1) Daylighting in New Gym; (2) Solar Photovoltaics; (3) Solar Domestic Hot Water Pre-Heat; and (4) Solar Outside Air Pre-Heat Following are the findings of the energy savings and cost-effectiveness analysis of above alternative energy saving technologies.

  7. Economics of power plant district and process heating in Richland, Washington

    SciTech Connect

    Fassbender, L.L.; Bloomster, C.H.

    1981-04-01

    The economic feasibility of utilizing hot water from nuclear reactors to provide district heating for private residences in Richland, Washington, and space and process heating for nearby offices, part of the Hanford Reservation, and the Lamb-Weston potato processing plant is assessed. Specifically, the practicality of using hot water from the Washington Public Power Supply System's WNP-1 reactor, which is currently under construction on the Hanford Reservation, just north of the City of Richland is established. World-wide experience with district heating systems and the advantages of using these systems are described. The GEOCITY computer model used to calculate district heating costs is described and the assumptions upon which the costs are based are presented. District heating costs for the city of Richland, process heating costs for the Lamb-Weston potato processing plant, district heating costs for the Horn Rapids triangle area, and process heating costs for the 300 and 3000 areas are discussed. An economic analysis is discussed and institutional restraints are summarized. (MCW)

  8. Environmental assessment, K Pool fish rearing, Hanford Site, Richland, Washington

    SciTech Connect

    1996-12-01

    The US Department of Energy (DOE) has a need to respond to a request to lease facilities at the Hanford Site 100-KE and 100-KW filter plant pools (K Pools) for fish rearing activities. These fish rearing activities would be: (1) business ventures with public and private funds and (2) long-term enhancement and supplementation programs for game fish populations in the Columbia River Basin. The proposed action is to enter into a use permit or lease agreement with the YIN or other parties who would rear fish in the 100-K Area Pools. The proposed action would include necessary piping, pump, and electrical upgrades of the facility; cleaning and preparation of the pools; water withdrawal from the Columbia River, and any necessary water or wastewater treatment; and introduction, rearing and release of fish. Future commercial operations may be included.

  9. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  10. [Interview]: Alexandre Shvartsburg, Pacific Northwest National Laboratory, Richland, WA, USA

    SciTech Connect

    Shvartsburg, Alexandre A.

    2012-12-01

    IMS/ToF technology in Synapt instruments, Waters has greatly increased its impact via expanded number and diversity of applications. Concurrently, Guevremont at Canadian NRC has perfected FAIMS coupled to MS, deployed it for real-world bio and environmental analyses, and widely distributed it in the Ionalytics Selectra system (subsequently installed on Thermo MS platforms). The latest breakthrough is ultra-FAIMS by Owlstone, where extreme fields allow numerous qualitatively new separations and operational modes that we just begin to explore. Q3: Where do you see ion mobility - mass spectrometry making the most impact in the next 5 years? Any predictions for where the field will go? Sciences dealing with perturbations in media (such as optics or acoustics) at some point shift from the linear to nonlinear paradigm, where propagation depends on the magnitude of perturbation or its driving force. While the linear part remains industrially important (e.g., eyewear and architectural glass for optics), frontline research moves to nonlinear phenomena. IMS is undergoing that transition now with the rise of FAIMS, which should continue as the fundamental understanding improves, new modalities and applications emerge, and more instrumentation is introduced by vendors. Modifying and augmenting FAIMS separations through vapor dopants that render ion mobilities less linear is becoming routine. I expect this area to advance, extending to more specific interactions and to complexation with solution additives. Another route to higher separation power is integrating FAIMS with conventional IMS; proliferation of both technologies would make such 2-D platforms common. Along with mass spectrometry and conventional IMS, FAIMS will address increasingly large macromolecules, including proteins and their complexes.

  11. Hanford and the Tri-Cities economy 1997

    SciTech Connect

    Scott, M.J.

    1998-04-09

    The missions of the US Department of Energy`s Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). While the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the local Tri-Cities economy for purposes of this study. In the Federal fiscal year (FY) 1997 (October 1, 1996 through September 30, 1997), the total impact of DOE`s local $1.7 billion budget was felt through payrolls and local purchases of goods and services that totaled about $774 million. Directly or indirectly, the DOE/RL budget sustained an estimated 36% of all local employment (30,300 out of 84,800 jobs) and up to 67% of local wage income.

  12. Qualitative risk assessment for the 100-KR-1 source operable unit

    SciTech Connect

    Naiknimbalkar, N.M.

    1994-09-01

    The 100-KR-1 operable unit is located within the 100 Area of the Hanford Site. The 100 Area of the Hanford Site was included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides the qualitative risk assessments for the high priority waste sites associated with this operable unit. The application of the HPPS at the 100-KR-1 operable unit is discussed in detail in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-1 Operable Unit (DOE-RL 1992).

  13. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    SciTech Connect

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation`s supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington.

  14. Fiscal year 1996 U.S. Department of Energy, Richland Operations Office Site summary baseline

    SciTech Connect

    Johndro-Collins, A.

    1995-10-01

    The technical baseline is a hierarchical description of the Hanford Site cleanup mission. This technical baseline does not address the science, technology, or economic transition missions. It begins with a definition of the existing conditions at the Hanford Site, provides a description of the end product or mission accomplishments at completion, presents a statement of the major requirements and constraints that must be observed during the performance of the mission, and provides a statement of the top-level strategic approach to accomplish the mission. Mission-level interfaces are also described. This information is further defined hierarchically in increasing levels of detail. This definition is composed of the following major elements: functions that are key task descriptions; requirements that are the measurable standards to which the functions must be performed; architectures which are specific engineering solutions or systems that perform the functions described earlier; and verification ensuring the system satisfies the requirements and fulfills the functions. The above information is supplemented with the following: interface data; risk analyses and watch lists; assumptions; and required analyses.

  15. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    SciTech Connect

    Not Available

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  16. A Demonstration of the Interrelating of Library and Basic Education Services for Disadvantaged Adults. Final Report, Richland County School District Number One.

    ERIC Educational Resources Information Center

    McMillan, Eunice

    Two agencies of the Columbia, South Carolina community, the Richland County Public Library and the Adult Education office of Richland County School District One, merged their efforts to better serve clients and potential clients of the Adult Basic Education (ABE) program of District One in 1972-73 with the support of a grant channeled through…

  17. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    SciTech Connect

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  18. Collaboration at Richland School District Two: Teachers and Administrators Design and Implement a Teacher Evaluation System that Supports Professional Growth.

    ERIC Educational Resources Information Center

    Egelson, Paula

    This paper reports on the implementation of a formative evaluation plan developed by nine educators (seven teachers and two administrators) in Richland School District Two (Columbia, South Carolina). Experienced high school teachers set improvement goals for themselves and met with evaluators or peers throughout the year to discuss progress and…

  19. Geologic map of the Richland 1:100,000 quadrangle, Washington

    SciTech Connect

    Reidel, S.P.; Fecht, K.R.

    1993-09-01

    This map of the Richland 1:100,000-scale quadrangle, Washington, shows the geology of one of fifteen complete or partial 1:100,000-scale quadrangles that cover the southeast quadrant of Washington. Geologic maps of these quadrangles have been compiled by geologists with the Washington Division of Geology and Earth Resources (DGER) and Washington State University and are the principal data sources for a 1:250,000-scale geologic map of the southeast quadrant of Washington, which is in preparation. Eleven of these quadrangles are being released as DGER open-file reports. The map of the Wenatchee quadrangle has been published by the US Geological Survey, and the Moses Lake, Ritzville quadrangles have already been released.

  20. Columbia River monitoring: Summary of chemical monitoring along cross sections at Vernita Bridge and Richland

    SciTech Connect

    Dirkes, R.L.; Patton, G.W.; Tiller, B.L.

    1993-05-01

    This report presents the results of the chemical monitoring performed by the Surface Environmental Surveillance Project (SESP) along cross sections of the Columbia River established at Vernita Bridge and the Richland Pumphouse. Potential Hanford-origin chemical constituents of interest were selected based on their presence in ground water near the river, past surveillance efforts that have documented their entry into the river, and reviews of special study reports, CERCIA remedial investigation/feasibility study (RI/FS) documentation, RCRA facility investigation/corrective measure (FI/CW) study plans, and preliminary risk assessments. Results presented in this report include volatile organic compounds, metals, and anions. The data were generated as part of the routine Columbia River monitoring program currently conducted as part of the SESP.

  1. Assessment of low-flow water quality in Richland Creek, Illinois

    USGS Publications Warehouse

    Freeman, W.O.; Schmidt, A.R.

    1986-01-01

    To study the effects of urbanization on water quality, the relations of several stream processes to concentrations of dissolved oxygen and other constituents were evaluated during low-flow periods for a 30.1-mi reach of Richland Creek in southwestern Illinois. The study used both measured data and computer simulations. Reaeration rates and traveltimes were measured at various flow rates using a steady-state, gas-tracer technique. Sediment-oxygen demands were measured at several locations throughout the study reach. Stream discharge, stage, temperature, and chemical-constituent concentrations were measured during two 24-hr periods in July and August 1984. The data were then used to describe water quality and to calibrate and verify the QUAL-II one-dimensional, steady-state, water quality model. (USGS)

  2. A Fisheries Evaluation of the Richland and Wapato Canal Fish Screening Facilities, Spring 1987 : Annual Report.

    SciTech Connect

    Neitzel, Duane A.; Abernethy, C.Scott; Lusty, E.William; Wampler, Sally J.

    1988-02-01

    We evaluated the effectiveness of new fish screening facilities at the Richland and Wapato canals in south-central Washington State. The screen integrity tests at the Richland Screens indicated that 100% of fall chinook salmon fry (Oncorhynchus tshawytscha) released in front of the screens were prevented from entering the canal behind the screens. Our estimate is based on a 61% catch efficiency for control fish planted behind the screens. At the Wapato Canal, we estimated that between 3% and 4% of the test fish were either impinged on the screen surface and passed over the screens or passed through faulty screen seals. Our estimate is based over the screens or passed through faulty screen seals. Our estimate is based on a greater than 90% capture of control fish released in front of the screens. At the Wapato Screens, we estimated that 0.8% of steelhead smolts (Salmo gairdneri) and 1.4% of spring chinook salmon smolts released during low canal flow tests wee descaled. During full canal flow tests, 1.6% of the steelhead and 3.1% of the spring chinook salmon released were descaled. The fish return pipe at the Wapato Canal was tested: the estimate of descaled test fish wa not different from the estimate of descaled control fish. The time required for fish to exit from the Wapato Screen forebay varied with species and with canal flow. During low canal flows, 43.2% of steelhead and 61.6% of spring chinook salmon smolts released at the trash racks were captured in the fish return within 96 hr. 11 refs., 11 figs., 10 tabs.

  3. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    SciTech Connect

    BYRNES ME

    2008-07-18

    , the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle

  4. Inspection of surveillance equipment and activities at DOE Field Office, Richland

    SciTech Connect

    Not Available

    1991-09-30

    The purpose of this inspection was to review surveillance activities by the Department of Energy's (DOE) Field Office, Richland (RL) and contractor employees at the RL Hanford site for efficiency and economy and compliance with laws and regulations. The scope included surveillance activities, procedures, training, types of surveillance equipment, and management controls over the equipment and activities. We also looked at Departmental policies and procedures regarding the equipment and activities. Allegations of illegal surveillance that came to our attention during the course of this inspection were referred to the Department of Justice. As part of our review, inspectors were on-site at RL from February 11, 1991, through March 1, 1991. Follow-up trips to RL were also made in April, May, and June 1991. We also conducted interviews at Albuquerque, Savannah River, and Germantown of former RL employees and RL contractors who were on travel. Officials from DOE's Office of General Counsel (OGC), Office of Security Affairs, and Office of Safeguards and Security (S S) were also interviewed regarding the Department's purchase and possession of wiretapping and eavesdropping devices. We obtained 75 signed sworn statements from 55 individuals during the course of the inspection. 1 fig., 1 tab.

  5. A Fisheries Evaluation of the Richland and Toppenish/Satus Canal Fish Screening Facilities, Spring 1986 Annual Report.

    SciTech Connect

    Neitzel, D.A.; Abernethy, C. Scott; Lusty, E. William

    1987-05-01

    The fisheries evaluation phase of diversion screen effectiveness summarizes the results of work at the Richland and Toppenish/Satus Fish screening facilities (Richland Screens and Toppenish/Satus Screens) during 1986. More than 10,000 steelhead, Salmo gairdneri, and chinook salmon, Oncorhynchus tshawytscha, were released at the screen diversions. At the Richland Screens, 61% of the released steelhead were recovered and 1.1% were descaled; 93% of the spring chinook salmon were recovered and less than 1% were descaled. At the Toppenish/Satus Screens, only steelhead were evaluated for descaling; 88.9% were recovered and 23.9% were descaled. Only steelhead were evaluated because the Yakima River fisheries managers did not expect any other smolts to occur in Toppenish Creek. Because of the acclimation conditions and the amount of time the fish had to be held before testing, some of the test population were descaled during holding and transportation. The 23.9% descaling for the test fish was compared to 26.4% for the controls.

  6. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally impacted. (5) Environmental

  7. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  8. Tank farm surveillance and waste status summary report for June 1993

    SciTech Connect

    Hanlon, B.M.

    1993-10-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  9. Tank farm surveillance and waste status summary report for December 1993

    SciTech Connect

    Hanlon, B.M.

    1994-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special 9 surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, U.S. Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  10. Tank Farm surveillance and waste status summary report for September 1993

    SciTech Connect

    Hanlon, B.M.

    1994-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  11. Tank farm surveillance and waste status summary report for May 1994

    SciTech Connect

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  12. Tank farm surveillance and waste status summary report for November 1992

    SciTech Connect

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  13. Tank farm surveillance and waste status summary report for January 1993

    SciTech Connect

    Hanlon, B.M.

    1993-03-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  14. Tank farm surveillance and waste status summary report for December 1992

    SciTech Connect

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  15. Tank Farm surveillance and waste status summary report for March 1993

    SciTech Connect

    Hanlon, B.M.

    1993-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are Contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding flank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  16. Tank farm surveillance and waste status summary report for October 1992

    SciTech Connect

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  17. Tank farm surveillance and waste status summary report for November 1993

    SciTech Connect

    Hanlon, B.M.

    1994-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I. Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  18. Tank Farm surveillance and waste status summary report for February 1994

    SciTech Connect

    Hanlon, B.M.

    1994-07-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is Intended to meet the requirement of US Department of Energy Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  19. Tank Farm surveillance and waste status summary report for July 1993

    SciTech Connect

    Hanlon, B.M.

    1993-11-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vesseL integrity are contained within the report. This report provides data on each of the existing 177 Large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  20. Statement of Work for Drilling Five CERCLA Groundwater Monitoring Wells During Fiscal Year 2006, 300-FF-5 Operable Unit

    SciTech Connect

    Williams, Bruce A.

    2005-08-01

    Pacific Northwest National Laboratory, the U.S. Department of Energy (DOE), and the regulators have agreed that two characterization wells along with three additional performance monitoring wells shall be installed in the 300-FF-5 Operable Unit as defined in the proposed Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement [TPA]) Milestone M-24-57 and the 300-FF-5 Limited Field Investigation plan (DOE/RL-2005-47). This document contains the statement of work required to drill, characterize, and construct the proposed groundwater monitoring wells during FY 2006.

  1. Reservoir characterization of the Mississippian Ratcliffe, Richland County, Montana, Williston Basin. Topical report, September 1997

    SciTech Connect

    Sippel, M.; Luff, K.D.; Hendricks, M.L.

    1998-07-01

    This topical report is a compilation of characterizations by different disciplines of the Mississippian Ratcliffe in portions of Richland County, MT. Goals of the report are to increase understanding of the reservoir rocks, oil-in-place, heterogeneity and methods for improved recovery. The report covers investigations of geology, petrography, reservoir engineering and seismic. The Ratcliffe is a low permeability oil reservoir which appears to be developed across much of the study area and occurs across much of the Williston Basin. The reservoir has not been a primary drilling target in the study area because average reserves have been insufficient to payout the cost of drilling and completion despite the application of hydraulic fracture stimulation. Oil trapping does not appear to be structurally controlled. For the Ratcliffe to be a viable drilling objective, methods need to be developed for (1) targeting better reservoir development and (2) better completions. A geological model is presented for targeting areas with greater potential for commercial reserves in the Ratcliffe. This model can be best utilized with the aid of 3D seismic. A 3D seismic survey was acquired and is used to demonstrate a methodology for targeting the Ratcliffe. Other data obtained during the project include oriented core, special formation-imaging log, pressure transient measurements and oil PVT. Although re-entry horizontal drilling was unsuccessfully tested, this completion technology should improve the economic viability of the Ratcliffe. Reservoir simulation of horizontal completions with productivity of three times that of a vertical well suggested two or three horizontal wells in a 258-ha (640-acre) area could recover sufficient reserves for profitable drilling.

  2. POTENTIAL USE OF ACTIVATED CARBON TO RECOVER TC-99 FROM 200 WEST AREA GROUNDWATER AS AN ALTERNATIVE TO MORE EXPENSIVE RESINS HANFORD SITE RICHLAND WASNINGTON

    SciTech Connect

    BYRNES ME; ROSSI AJ; TORTOSO AC

    2009-12-03

    Recent treatability testing performed on groundwater at the 200-ZP-1 Operable Unit at the Hanford Site in Richland, Washington, has shown that Purolite{reg_sign} A530E resin very effectively removes Tc-99 from groundwater. However, this resin is expensive and cannot be regenerated. In an effort to find a less expensive method for removing Tc-99 from the groundwater, a literature search was performed. The results indicated that activated carbon may be used to recover technetium (as pertechnetate, TCO{sub 4}{sup -}) from groundwater. Oak Ridge National Laboratory used activated carbon in both batch adsorption and column leaching studies. The adsorption study concluded that activated carbon absorbs TCO{sub 4}{sup -} selectively and effectively over a wide range of pH values and from various dilute electrolyte solutions (< 0.01 molarity). The column leaching studies confirmed a high adsorption capacity and selectivity of activated carbon for TCO{sub 4}{sup -}. Since activated carbon is much less expensive than Purolite A530E resin, it has been determined that a more extensive literature search is warranted to determine if recent studies have reached similar conclusions, and, if so, pilot testing of 200-ZP-1 groundwater wi11 likely be implemented. It is possible that less expensive, activated carbon canisters could be used as pre-filters to remove Tc-99, followed by the use of the more expensive Purolite A530E resin as a polishing step.

  3. HANFORDS PUBLIC TOUR PROGRAM - AN EXCELLENT EDUCATIONAL TOOL

    SciTech Connect

    SINCLAIR KM

    2010-12-07

    Prior to 2001, the Department of Energy (DOE) sponsored limited tours of the Hanford Site for the public, but discontinued the program after the 9/11 terrorist attacks on the U.S. In 2003, DOE's Richland Operations Office (DOE-RL) requested the site's prime contractor to reinstate the public tour program starting in 2004 under strict controls and security requirements. The planning involved a collaborative effort among the security, safety and communications departments of DOE-RL and the site's contracting companies. This paper describes the evolution of, and enhancements to, Hanford's public tours, including the addition of a separate tour program for the B Reactor, the first full-scale nuclear reactor in the world. Topics included in the discussion include the history and growth of the tour program, associated costs, and visitor surveys and assessments.

  4. Annual Status Report (FY2008) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2009-12-18

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE 0 435.1, Radioactive to be considered or purposes of Waste Management, and implemented by DOE/RL-2000-292, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual report for fiscal year 2008 of PNNL-1 1800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis. The main emphasis of DOE/RL-2000-29 Is to identify additional data and information to enhance the Composite Analysis and the subsequent PNNL- 11800 Addendum, Addendum to Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Addendum, and to address secondary issues identified during the review of the Composite Analysis.

  5. Hanford cultural resources management plan

    SciTech Connect

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  6. Community-Operated Environmental Surveillance Program

    SciTech Connect

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  7. Environmental consequences of postulated plutonium releases from Exxon Nuclear MOFP, Richland, Washington, as a result of severe natural phenomena

    SciTech Connect

    Jamison, J.D.; Watson, E.C.

    1980-02-01

    Potential environmental consequences in terms of radiation dose to people are presented for postulated plutonium releases caused by severe natural phenomena at the Exxon Nuclear Company Mixed Oxide Fabrication Plant (MOFP), Richland, Washington. The severe natural phenomena considered are earthquakes, tornadoes, high straight-line winds, and floods. Maximum plutonium deposition values are given for significant locations around the site. All important potential exposure pathways are examined. The most likely 50-year committed dose equivalents are given for the maximum-exposed individual and the population within a 50-mile radius of the plant. The maximum plutonium deposition values most likely to occur offsite are also given.

  8. Hanford 1999 Tier 2 Emergency and Hazardous Chemical Inventory Emergency Planning and Community Right to Know Act Section 312

    SciTech Connect

    ZALOUDEK, D.E.

    2000-03-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S. Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  9. 1998 Tier two emergency and hazardous chemical inventory - emergency planning and community right-to-know act section 312

    SciTech Connect

    ZALOUDEK, D.E.

    1999-03-02

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S, Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  10. Evaluation of the Hanford RI/FS cost projections

    SciTech Connect

    Not Available

    1991-06-01

    The US Department of Energy-Richland Operations (DOE-RL) tasked the Environmental Management Operations (EMO) to review the cost estimates and implementation process for the Hanford Remedial Investigation/Feasibility Study (RI/FS) Program as defined by the Hanford RCRA/CERLA Past Practices Cost Models. The purpose of the review was to determine if there were opportunities to reduce the RI/FS costs at Hanford, with a focus on the approach being taken at Hanford to implement and complete the RI/FS process. This volume contains 4 appendices for the evaluation of the Hanford RI/FS Cost Projections.

  11. LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575

    SciTech Connect

    MOREN RJ; GRINDSTAFF KD

    2012-01-11

    The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currently planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between

  12. Hanford year 2000 Business Continuity Plan

    SciTech Connect

    VORNEY, S.V.

    1999-11-01

    The goal of Department of Energy Richland Operations (DOE-RL) Year 2000 (Y2K) effort is to ensure that the Hanford site successfully continues its mission as we approach and enter the 21th century. The Y2K Business Continuity Planning process provides a structured approach to identify Y2K risks to the site and to mitigate these risks through Y2K Contingency Planning, ''Zero-Day'' Transition Planning and Emergency Preparedness. This document defines the responsibilities, processes and plans for Hanford's Y2K Business Continuity. It identifies proposed business continuity drills, tentative schedule and milestones.

  13. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  14. Annual Status Report (FY2009) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    SciTech Connect

    Nichols, W. E.

    2010-02-10

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual status report for fiscal year (FY) 2009 of PNNL-11800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  15. Masters Thesis- Criticality Alarm System Design Guide with Accompanying Alarm System Development for the Radioisotope Production Laboratory in Richland, Washington

    SciTech Connect

    Greenfield, Bryce A.

    2009-12-01

    A detailed instructional manual was created to guide criticality safety engineers through the process of designing a criticality alarm system (CAS) for Department of Energy (DOE) hazard class 1 and 2 facilities. Regulatory and technical requirements were both addressed. A list of design tasks and technical subtasks are thoroughly analyzed to provide concise direction for how to complete the analysis. An example of the application of the design methodology, the Criticality Alarm System developed for the Radioisotope Production Laboratory (RPL) of Richland, Washington is also included. The analysis for RPL utilizes the Monte Carlo code MCNP5 for establishing detector coverage in the facility. Significant improvements to the existing CAS were made that increase the reliability, transparency, and coverage of the system.

  16. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    SciTech Connect

    1993-11-01

    The hub of today`s programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE`s Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed.

  17. Environmental Management Performance Report for December 1999

    SciTech Connect

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  18. Subsurface barrier feasibility evaluation: External review meeting report

    SciTech Connect

    Lindberg, S.L.; Rouse, J.K.

    1994-12-01

    The Westinghouse Hanford Company -- Tank Waste Remediation System Division (TWRS) Program is evaluating subsurface barrier technologies for potential use in supporting remediation of the Hanford Tank Farms for the US Department of Energy, Richland Operations Office (DOE-RL). An External Review Team (ERT) was assembled to perform an independent technical review of the work performed to-date supporting the evaluation process. A set of draft documents was forwarded to the ERT for their review, and a meeting was held August 10 through 12, 1994, to facilitate comments and resolutions. This document summarizes the meeting, the comments provided by the ERT, and the ongoing work to resolve the comments and support a pending decision by The US Department of Energy, Richland Operations Office; the Washington State Department of Ecology; and the US Environmental Protection Agency.

  19. Environmental Assessment and Finding of No Significant Impact: Widening Trench 36 of the 218-E-12B Low-Level Burial Ground, Hanford Site, Richland, Washington

    SciTech Connect

    N /A

    1999-02-11

    This environmental assessment was prepared to assess potential environmental impacts associated with the proposed action to widen and operate unused Trench 36 in the 218-E-12B Low-Level Burial Ground for disposal of low-level waste. Information contained herein will be used by the Manager, U.S. Department of Energy, Richland Operations Office, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No Significant Impact will be issued and the action may proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations 1508.27. This environmental assessment was prepared in compliance with the ''National Environmental Policy Act of1969'', as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of ''National Environmental Policy Act'' (Title 40, Code of Federal Regulations 1500-1508), and the U.S. Department of Energy Implementing Procedures for ''National Environmental Polio Act'' (Title 10, Code of Federal Regulations 1021). The following is a description of each section of this environmental assessment. (1) Purpose and Need for Action. This section provides a brief statement concerning the problem or opportunity the U.S, Department of Energy is addressing with the Proposed Action. Background information is provided. (2) Description of the Proposed Action. This section provides a description of the Proposed Action with sufficient detail to identify potential environmental impacts. (3) Alternatives to the Proposed Action. This section describes reasonable,alternative actions to the Proposed Action, which addresses the Purpose and Need. A No Action Alternative, as required by Title 10, Code of Federal Regulations 1021

  20. Screening of Potential Remediation Methods for the 200-BP-5 Operable Unit at the Hanford Site

    SciTech Connect

    Truex, Michael J.; Dresel, P. EVAN; Nimmons, Michael J.; Johnson, Christian D.

    2006-09-21

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-BP-5 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final (EPA 1988). The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers) identified in the groundwater sampling and analysis plan for the operable unit (DOE/RL-2001-49, Rev. 1) with additions.

  1. Altitude of the water table in the alluvial and Wilcox aquifers in the vicinity of Richland and Tehuacana creeks and the Trinity River, Texas, December 1979

    USGS Publications Warehouse

    Garza, Sergio

    1980-01-01

    This map shows the altitude of the water table in the alluvial and Wilcox aquifers in the vicinity of Richland and Tehuacana Creeks and the Trinity River, Tex., in December 1979. The water-table contours were constructed on the basis of water-level control derived from an inventory of shallow wells in the area, topographic maps, and field locations of numerous small springs and seeps. (USGS)

  2. Evaluation of P-101 course Orientation to Occupational Safety Compliance in DOE'' taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, Orientation to Occupational Safety in DOE'', (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments.

  3. Evaluation of P-101 course ``Orientation to Occupational Safety Compliance in DOE`` taught in Richland, Washington, June 16--June 26, 1992

    SciTech Connect

    Colley, D.L.

    1993-03-01

    This report summarizes trainee evaluations for the Safety Training Section course, ``Orientation to Occupational Safety in DOE``, (P-101) which was conducted June 16 to 26, 1992 at Hanford, in Richland, Washington. Sections 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments.

  4. Hanford Site Wide Transportation Safety Document [SEC 1 Thru 3

    SciTech Connect

    MCCALL, D L

    2002-06-01

    This safety evaluation report (SER) documents the basis for the US Department of Energy (DOE), Richland Operations Office (RL) to approve the Hanford Sitewide Transportation Safety Document (TSD) for onsite Transportation and Packaging (T&P) at Hanford. Hanford contractors, on behalf of DOE-RL, prepared and submitted the Hanford Sitewide Transportation Safety Document, DOE/RL-2001-0036, Revision 0, (DOE/RL 2001), dated October 4, 2001, which is referred to throughout this report as the TSD. In the context of the TSD, Hanford onsite shipments are the activities of moving hazardous materials, substances, and wastes between DOE facilities and over roadways where public access is controlled or restricted and includes intra-area and inter-area movements. The TSD sets forth requirements and standards for onsite shipment of radioactive and hazardous materials and wastes within the confines of the Hanford Site on roadways where public access is restricted by signs, barricades, fences, or other means including road closures and moving convoys controlled by Hanford Site security forces.

  5. Confirmatory radiological survey for the 190-C Main Pumphouse Facility decommissioning at the Hanford Site, Richland, Washington

    SciTech Connect

    Coleman, R.L.; Forbes, G.H.

    1997-06-01

    An independent assessment of remedial action activities at the 190-C Main Pumphouse Facility at the Hanford Site, Richland, Washington has been accomplished by the Oak Ridge National Laboratory Environmental Assessments Group. The purpose of the assessment was to confirm the site`s compliance with DOE applicable guidelines and provide independent measurements of the activity levels in the 190-C trenches and 105-C process water tunnels. The assessment included reviews of the Decontamination and Decommissioning Plan and data provided in the pre- and post-remedial action surveys. An on-site independent verification survey of the facility was conducted during the period of November 19--21, 1996. The independent verification survey included beta and gamma scans, smears for removable contamination, and direct measurements for beta-gamma activity in the trenches and tunnels. The same measurements and scans, with the addition of alpha measurements, were performed on the floor in the filter repair confinement area. The facility was also spot-checked for direct alpha and beta-gamma activity.

  6. 300 Area steam plant replacement, Hanford Site, Richland, Washington: Environmental assessment

    SciTech Connect

    1997-03-01

    Steam to support process operations and facility heating is currently produced by a centralized oil-fired plant located in the 300 Area and piped to approximately 26 facilities in the 300 Area. This plant was constructed during the 1940s and, because of tis age, is not efficient, requires a relatively large operating and maintenance staff, and is not reliable. The US Department of Energy is proposing an energy conservation measure for a number of buildings in the 300 Area of the Hanford Site. This action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a fuel source for many of these units and constructing a central control building to operate and maintain the system. A new steel-sided building would be constructed in the 300 Area in a previously disturbed area at least 400 m (one-quarter mile) from the Columbia River, or an existing 300 Area building would be modified and used. This Environmental Assessment evaluates alternatives to the proposed actions. Alternatives considered are: (1) the no action alternative; (2) use of alternative fuels, such as low-sulfur diesel oil; (3) construction of a new central steam plant, piping and ancillary systems; (4) upgrade of the existing central steam plant and ancillary systems; and (5) alternative routing of the gas distribution pipeline that is a part of the proposed action. A biological survey and culture resource review and survey were also conducted.

  7. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  8. Solar heating, cooling, and hot water systems installed at Richland, Washington

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The project described is part of the U. S. Department of Energy's solar demonstration program, and became operational in April 1978. The solar system uses 6,000 square feet of flat-plate liquid collectors in a closed loop to deliver solar energy through a liquid-liquid heat exchanger to the building heat-pump duct work or 9,000-gallon thermal energy storage tank. A 25-ton Arkla solar-driven absorption chiller provides the cooling, in conjunction with a 2,000 gallon chilled water storage tank and reflective ponds on three sides of the building surplus heat. A near-by building is essentially identical except for having conventional heat-pump heating and cooling, and can serve as an experimental control. An on-going public relations program was provided from the beginning of the program, and resulted in numerous visitors and tour groups.

  9. Management of Hanford Site non-defense production reactor spent nuclear fuel, Hanford Site, Richland, Washington

    SciTech Connect

    1997-03-01

    The US Department of Energy (DOE) needs to provide radiologically, and industrially safe and cost-effective management of the non-defense production reactor spent nuclear fuel (SNF) at the Hanford Site. The proposed action would place the Hanford Site`s non-defense production reactor SNF in a radiologically- and industrially-safe, and passive storage condition pending final disposition. The proposed action would also reduce operational costs associated with storage of the non-defense production reactor SNF through consolidation of the SNF and through use of passive rather than active storage systems. Environmental, safety and health vulnerabilities associated with existing non-defense production reactor SNF storage facilities have been identified. DOE has determined that additional activities are required to consolidate non-defense production reactor SNF management activities at the Hanford Site, including cost-effective and safe interim storage, prior to final disposition, to enable deactivation of facilities where the SNF is now stored. Cost-effectiveness would be realized: through reduced operational costs associated with passive rather than active storage systems; removal of SNF from areas undergoing deactivation as part of the Hanford Site remediation effort; and eliminating the need to duplicate future transloading facilities at the 200 and 400 Areas. Radiologically- and industrially-safe storage would be enhanced through: (1) removal from aging facilities requiring substantial upgrades to continue safe storage; (2) utilization of passive rather than active storage systems for SNF; and (3) removal of SNF from some storage containers which have a limited remaining design life. No substantial increase in Hanford Site environmental impacts would be expected from the proposed action. Environmental impacts from postulated accident scenarios also were evaluated, and indicated that the risks associated with the proposed action would be small.

  10. Operations

    ERIC Educational Resources Information Center

    Wilkins, Jesse L. M.; Norton, Anderson; Boyce, Steven J.

    2013-01-01

    Previous research has documented schemes and operations that undergird students' understanding of fractions. This prior research was based, in large part, on small-group teaching experiments. However, written assessments are needed in order for teachers and researchers to assess students' ways of operating on a whole-class scale. In this study,…

  11. Technical support for authorization of 242-A evaporator campaign 97-2, Hanford Site, Richland, Washington

    SciTech Connect

    Daling, P.M.; Lavender, J.C.

    1997-07-01

    An analysis was performed to determine the acceptability of processing 242-A Evaporator/Crystallizer Campaign 97-2 feed. Inhalation unit liter doses (ULDs) were calculated using the methods and data described in the Tank Waste Remediation System Basis for Interim Operation (TWRS BIO) and 242-A Evaporator/Crystallizer Safety Analysis Report. The ULD calculated for the Campaign 97-2 slurry was found to be less than the TWRS BIO evaporator slurry ULD and so would be within the analyzed safety envelope defined in the TWRS BIO. The Evaporator slurry ULD established in the TWRS BIO and supporting documents was calculated using the bounding source strength defined in the 242-A Evaporator SAR. Consequently, the risks and consequences associated with the Campaign 97-2 slurry would be lower than those already accepted by DOE and documented in the TWRS BIO and 242-A Evaporator SAR. The direct radiation exposures from formation of a liquid pool of Campaign 97-2 slurry were demonstrated to be less than the exposures from a pool formed by bounding source strength evaporator slurry as defined in the 242-A Evaporator SAR. This was demonstrated via a comparison of the Campaign 97-2 slurry composition and the 242-A Evaporator SAR bounding source strength. It was concluded that the direct radiation exposures from Campaign 97-2 slurry would be within the analyzed safety envelope in the 242-A Evaporator SAR.

  12. Radiological dose assessment for the decontaminated concrete removed from 183-H solar evaporation basins at the Hanford site, Richland, Washington

    SciTech Connect

    Kamboj, S.; Faillace, E.; Yu, C.

    1997-01-01

    Potential maximum radiation dose rates over a 1,000-year time horizon were calculated for exposure to the decontaminated concrete removed from the 183-H Solar Evaporation Basins at the Hanford Site, Richland, Washington. The RESRAD computer code, Version 5.62, which implements the methodology described in the US Department of Energy`s manual for developing residual radioactive material guidelines, was used in this evaluation. Currently, the concrete is not being used. Four potential exposure scenarios were developed for the land area where the decontaminated concrete will be stored. In Scenario A industrial use of the land is assumed; in Scenario B recreational use of the land is assumed; in Scenario C residential use of the land is assumed; and in Scenario D (a plausible but unlikely land-use scenario), the presence of a subsistence farmer in the immediate vicinity of the land is assumed. For Scenarios A and B, water used for drinking is assumed to be surface water from the Columbia River; for Scenarios C and D, groundwater drawn from a well located at the downgradient edge of the storage area is the only source of water for drinking, irrigation, and raising livestock. Conservative parameters values were used to estimate the radiation doses. The results of the evaluation indicate that the US Department of Energy`s dose limit of 100 mrem/yr would not be exceeded for any of the scenarios analyzed. The potential maximum dose rates for Scenarios A, B, C, and D are 0.75, 0.022, 29, 29 mrem/yr, respectively. An uncertainty analysis was performed to determine which parameters have the greatest impact on the estimated doses. The doses in Scenarios C and D were found to be very sensitive to the magnitude of the irrigation rate.

  13. Atmospheric dispersion of ammonia accidentally released from the 242-A Evaporator, Hanford Site, Richland, Washington

    SciTech Connect

    Daling, P.M.; Lavender, J.C.

    1997-11-01

    Two errors have been identified in the authorization basis for the 242-A Evaporator at the Hanford Site. These errors, which appear in the 242-A Evaporator/Crystallizer Final Safety Analysis Report analysis of ammonia gas concentrations accidentally released from the 242-A Evaporator, are: (1) the vessel ventilation system flow rate used in the previous calculations is a factor of ten higher than the actual flow rate, and (2) the previous calculations did not account for the ammonia source term reduction that would occur via condensation of ammonia vapors, which will remove a large fraction of the ammonia from the exhaust gas stream. The purpose of this document is to correct these errors and recalculate the maximum ground-level concentrations of ammonia released to the environment as a result of potential errors in blending Evaporator feed. The errors offset each other somewhat, so it is unlikely that the 242-A Evaporator has operated outside its current authorization basis. However, the errors must be corrected and the results incorporated into a revision of the 242-A Evaporator/Crystallizer Safety Analysis Report, WHC-SD-WM-SAR-023. An EPA-approved atmospheric dispersion model, SCREEN3, was used to recalculate the maximum ground-level concentrations of ammonia that would be released from the 242-A Evaporator as a result of a feed-blending error. The results of the re-analysis of the 242-A Evaporator`s ammonia release scenario are as follows. The onsite receptor 100 m away from the release point (242-A vessel vent stack) is projected to be exposed to a maximum ground-level concentration of ammonia of 8.3 ppm. The maximally-exposed offsite receptor, located at the nearest Hanford Site boundary 16 km away from the 242-A vessel vent stack, will be exposed to a maximum ground-level concentration of 0.11 ppm ammonia.

  14. Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

    SciTech Connect

    Byrnes, Mark E.; Simmons, Sally; Morse, John

    2013-07-01

    On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite{sup R} A530E

  15. Evaluation of S-101 course Supervisors Orientation to Occupational Safety Compliance in DOE'' taught in Richland, Washington May 5--8, 1992

    SciTech Connect

    Wright, T.S.

    1992-09-01

    This report summarizes trainee evaluations for the Safety Training Section course, Supervisors' Orientation to Occupational Safety in DOE'', (S-101)which was conducted May 5--8 at Hanford, in Richland, Washington. Section 1.1 and 1.2 of this report summarizes the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students' expectations of the course.

  16. Evaluation of S-101 course ``Supervisors Orientation to Occupational Safety Compliance in DOE`` taught in Richland, Washington May 5--8, 1992

    SciTech Connect

    Wright, T.S.

    1992-09-01

    This report summarizes trainee evaluations for the Safety Training Section course, ``Supervisors` Orientation to Occupational Safety in DOE``, (S-101)which was conducted May 5--8 at Hanford, in Richland, Washington. Section 1.1 and 1.2 of this report summarizes the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students` expectations of the course.

  17. 78 FR 13932 - Yellowstone Valley Railroad, L.L.C.-Discontinuance of Lease and Trackage Rights Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Yellowstone Valley Railroad, L.L.C.--Discontinuance of Lease and Trackage Rights Operations Exemption--In Richland, Sheridan, Roosevelt, and Daniels Counties, Mont., and...

  18. Evaluation of S-101 course Supervisors' Orientation to Occupational Safety in DOE'' taught in Richland, Washington, May 20--May 23, 1991

    SciTech Connect

    Vinther, R W

    1991-07-01

    This report summarizes trainee evaluations for the DOE Safety Training Institute's course, Supervisors Orientation to Occupational Safety in DOE,'' which was conducted May 20--23, 1991 at Richland, Washington. The first part of the report summarizes the quantitative course evaluations that trainees provided upon completion of the course and provides a transcript of the trainees written comments in Appendix A. The second part summarizes results from the final examination designed to measure the knowledge gained from the course. The third part of the report summarizes course modifications and recommendations for improvement. Numeric course ratings were generally positive and show that the course material and instruction was very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students expectations of the course. Results from the final examination showed that students gained appropriate knowledge from the course.

  19. SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

    SciTech Connect

    RAST RS; RINKER MW; BAPANAALLI SK; DEIBLER JE; GUZMAN-LEONG CE; JOHNSON KI; KARRI NK; PILLI SP; SANBORN SE

    2010-10-22

    explored in the SST preliminary modeling. The reviews determined the level of detail necessary to perform the analyses of the SSTs. To guide the Phase II detailed modeling effort, preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. Conclusions were derived from case studies on one of the tank types when no additional runs of similar cases on other types of tanks were found necessary to derive those conclusions. The document reviews provided relatively complete temperature histories for Type IV tanks. The temperature history data for Type I, II, and III tanks was almost nonexistent for years prior to 1975. Document reviews indicate that there might be additional useful data in the US Department of Energy, Richland Operations Office (DOE-RL) records in Seattle, WA, and these records need to be reviewed to extract data that might have been disregarded during previous reviews. Thermal stress analyses were conducted using different temperature distribution scenarios on Type IV tanks. Such studies could not be carried out for other tank types due to lack of temperature history data. The results from Type IV tank analyses indicate that factors such as temperature distribution in the tank waste and rate of rise in waste temperature have a significant impact on the thermal stresses in the tank structures. Overall, the conclusion that can drawn from the thermal stress analyses is that these studies should be carried out for all tank types during the detailed analysis phase with temperature values that are reasonably close to the typical temperature

  20. Hanford Diversification and the Tri-Cities Economy FY 1999

    SciTech Connect

    SCOTT, M.J.

    2000-06-05

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study. In the federal fiscal year (FY) 1999 (October 1, 1998 through September 30, 1999), the total impact of DOE'S local $1.59 billion budget was felt through payrolls of $542 million and local purchases of goods and services of $226 million. The total local spending of $768 million was up slightly from the FY 1998 total of $765 million. Taking into account the multiplier effects of this spending, the DOE/RL budget sustained an estimated 32% of all local employment (28,250 out of 88,100 jobs) and about 35% of local earned income (almost $1.08 billion out of $3.08 billion). The decrease in these percentages from last year's report reflects an update of the model's economic structure based on the 1997 economic census year, a correction of a programming error in the model found during the update, and a broader definition of earnings that includes proprietor income, not just wages (see the Appendix for revisions to the previous forecasts). DOE budget increases in FY 2000 are expected to result in no change to the number of local DOE contractor jobs and about a $29 million increase in direct local spending.

  1. Hanford, diversification, and the Tri-Cities Economy FY 1998

    SciTech Connect

    SCOTT, M.J.

    1999-04-14

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study (see Figure 1). In the federal fiscal year (IV) 1998 (October 1, 1997 through September 30, 1998), the total impact of DOEs local $1.6 billion budget was felt through payrolls of $519 million and local purchases of goods and services of $246 million. The total local spending of $765 million was down slightly from the FY 1997 total of $774 million. Taking into account the slightly greater multiplier effects of this spending due to changes in its mix, the DOE/RL budget sustained an estimated 36% of all local employment (31,200 out of 86,000 jobs) and up to 64% of local wage income ($1.55 billion out of $2.40 billion). This was up slightly from the year before (29,500 jobs, $1.49 billion income). DOE budget increases in FY 1999 are expected to result in a net increase of about 200 local DOE contractor jobs over the September 30, 1998 level, or about equal to the FY 1998 average. In addition, economic diversification more than offset the impact of the local DOE losses in FY 1998 and, together with an initial economic boost from privatization of Hanford's tank waste cleanup, is expected to play a significant expansive role in FY 1999

  2. Hanford Immobilized Low Activity Waste (ILAW) Performance Assessment 2001 Version [Formerly DOE/RL-97-69] [SEC 1 & 2

    SciTech Connect

    MANN, F.M.

    2000-08-01

    The Hanford Immobilized Low-Activity Waste Performance Assessment examines the long-term environmental and human health effects associated with the planned disposal of the vitrified low-activity fraction of waste presently contained in Hanford Site tanks. The tank waste is the byproduct of separating special nuclear materials from irradiated nuclear fuels over the past 50 years. This waste is stored in underground single- and double-shell tanks. The tank waste is to be retrieved, separated into low-activity and high-level fractions, and then immobilized by vitrification. The US. Department of Energy (DOE) plans to dispose of the low-activity fraction in the Hanford Site 200 East Area. The high-level fraction will be stored at the Hanford Site until a national repository is approved. This report provides the site-specific long-term environmental information needed by the DOE to modify the current Disposal Authorization Statement for the Hanford Site that would allow the following: construction of disposal trenches; and filling of these trenches with ILAW containers and filler material with the intent to dispose of the containers.

  3. Water-Quality Assessment of the Trinity River Basin, Texas - Nutrients and Pesticides in the Watersheds of Richland and Chambers Creeks, 1993-95

    USGS Publications Warehouse

    Land, L.F.

    1997-01-01

    A study of nutrients and pesticides was conducted during February-August 1995 in the west-central part of the Trinity River Basin, where land commonly is used for growing crops. Water and bed-sediment samples were collected at 8 small reservoir sites in the headwaters (known as Natural Resources Conservation Service reservoirs), at 5 stream sites, and at 3 Richland-Chambers Reservoir sites. The analysis included data from the Chambers Creek near Rice site (08064100), which was sampled repeatedly during March 1993-September 1995. Total nitrogen concentrations in the Natural Resources Conservation Service reservoirs were less than 1.0 milligram per liter, as nitrogen, except in 2 of the 8 reservoirs. For the five stream sites, total nitrogen concentrations at the beginning of the study ranged from 0.5 to 1.8 milligrams per liter. Peaks were noted in all stream sites during either March or April; the greatest peak concentration was 4.8 milligrams per liter, as nitrogen. By the end of the study, concentrations decreased to less than 1.2 milligrams per liter, as nitrogen. In the Richland-Chambers Reservoir, the February-March and June sampling showed total nitrogen concentrations of about 0.6 milligram per liter, as nitrogen. At the beginning of the study, all five of the stream sites had total phosphorus concentrations less than 0.04 milligram per liter, as phosphorus. Peak concentrations in the streams occurred in the May sampling except at one site. Two sites had concentrations greater than 0.2 milligram per liter, as phosphorus. By the end of the study, concentrations decreased to less than 0.04 milligram per liter, as phosphorus, except at one site where the concentrations were about 0.08 milligram per liter. Concentrations in the Richland-Chambers Reservoir were less than 0.04 milligram per liter, as phosphorus. Total nitrogen and total phosphorus concentrations generally increased with streamflow and with the percentage of cropland in the drainage area upstream

  4. Hanford analytical services quality assurance requirements documents

    SciTech Connect

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  5. Performance assessment for the disposal of low-level waste in the 200 West Area Burial Grounds

    SciTech Connect

    Wood, M.I.; Khaleel, R.; Rittmann, P.D.; Lu, A.H.; Finfrock, S.H.; DeLorenzo, T.H.; Serne, R.J.; Cantrell, K.J.

    1995-06-01

    This document reports the findings of a performance assessment (PA) analysis for the disposal of solid low-level radioactive waste (LLW) in the 200 West Area Low-Level Waste Burial Grounds (LLBG) in the northwest corner of the 200 West Area of the Hanford Site. This PA analysis is required by US Department of Energy (DOE) Order 5820.2A (DOE 1988a) to demonstrate that a given disposal practice is in compliance with a set of performance objectives quantified in the order. These performance objectives are applicable to the disposal of DOE-generated LLW at any DOE-operated site after the finalization of the order in September 1988. At the Hanford Site, DOE, Richland Operations Office (RL) has issued a site-specific supplement to DOE Order 5820.2A, DOE-RL 5820.2A (DOE 1993), which provides additiona I ce objectives that must be satisfied.

  6. Technical Direction and Laboratories FY 1999 Annual Report

    SciTech Connect

    CRAWFORD, B.A.

    2000-09-07

    This annual report summarize achievements and list reports issued by members of TD&L, NHC group during Fiscal Year (FY) 1999, (October 1, 1998 through September 30, 1999). This report, issued by this organization, describes work in support of the Hanford Site and other U S . Department of Energy, Richland Operations Office (DOE-RL) programs. It includes information on the organization make-up, interfaces, and mission of the group. The TD&L is a group of highly qualified personnel with diverse disciplines (primarily chemistry specialties) that provide process, analytical, and in-situ chemistry services to engineering customers. This year of operation and interfaces with other contract organizations consumed considerable administrative efforts. Attention was directed to the technical challenges presented by the changing roles, responsibilities, and priorities of Hanford programs.

  7. Environmental Management Performance Report November 2000

    SciTech Connect

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  8. Environmental Management Performance Report April 2000

    SciTech Connect

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  9. HANFORD SITE LOW EXPOSURE PIPELINE REPAIR USING A NON-METALLIC COMPOSITE SYSTEM

    SciTech Connect

    HUTH RJ

    2009-11-12

    At the Department of Energy, Richland Operations (DOE-RL) Hanford site in eastern Washington, a 350 mm (14 inch) diameter high density polyethylene (HDPE) pump recirculation pipeline failed at a bonded joint adjacent to a radiologically and chemically contaminated groundwater storage basin. The responsible DOE-RL contractor, CH2MHill Plateau Remediation Company, applied a fiberglass reinforced plastic (composite) field repair system to the failed joint. The system was devised specifically for the HDPE pipe repair at the Hanford site, and had not been used on this type of plastic piping previously. This paper introduces the pipe failure scenario, describes the options considered for repair and discusses the ultimate resolution of the problem. The failed pipeline was successfully returned to service with minimal impact on waste water treatment plant operating capacity. Additionally, radiological and chemical exposures to facility personnel were maintained as low as reasonably achievable (ALARA). The repair is considered a success for the near term, and future monitoring will prove whether the repair can be considered for long term service and as a viable alternative for similar piping failures at the Hanford site.

  10. Environmental-stratigraphic cross sections of the Cretaceous Fox Hills Sandstone and Hell Creek Formation and Paleocene Fort Union Formation, Richland and Roosevelt Counties, Montana

    USGS Publications Warehouse

    Flores, R.M.; Lepp, C.L.

    1983-01-01

    This study was conducted to determine the stratigraphic, lithofacies, and deopsitional relationships of the Cretaceous Fox Hills Sandstone and Hell Creek Formation and The Paleocene Fort Union Formation. These relationships, shown in sections A-A', B-B', C-C', and D-D', we established form nearly continuous exposures in the Missouri River valley in Richland and Roosevelt Counties, Mont. The river valley topography is characterized by badlands, which permitted detailed description and construction of the stratigraphic framework of the formations within a 30-mi-long belt of exposures paralleling the Missouri River. This area of study is on the western flank of the Williston Basin and east of the Poplar Dome. The latter structure imparted a northeasterly regional dip to the rocks, which averages 25 ft per mi and is as much as 100 ft per mi according to Spencer (1980). The regional dip resulted in exposure of older rocks (Cretaceous) in the west to younger rocks (Tertiary) in the east. 

  11. Tank 241-C-103 organic vapor and liquid characterization and supporting activities, Hanford Site, Richland, Washington. Environmental Assessment

    SciTech Connect

    Not Available

    1993-08-10

    The action proposed is to sample the vapor space and liquid waste and perform other supporting activities in Tank 241-C-103 located in the 241-C Tank Farm on the Hanford Site. Operations at Tank 241-C-103 are curtailed because of an unreviewed safety question (USQ) concerning flammability issues of the organic waste in the tank. This USQ must be resolved before normal operation and surveillance of the tank can resume. In addition to the USQ, Tank 241-C-103 is thought to be involved in several cases of exposure of individuals to noxious vapors. This safety issue requires the use of supplied air for workers in the vicinity of the tank. Because of the USQ, the US Department of Energy proposes to characterize the waste in the vapor space and the organic and aqueous layers, to determine the volume of the organic layer. This action is needed to: (1) assess potential risks to workers, the public, and the environment from continued routine tank operations and (2) provide information on the waste material in the tank to facilitate a comprehensive safety analysis of this USQ. The information would be used to determine if a flammable condition within the tank is credible. This information would be used to prevent or mitigate an accident during continued waste storage and future waste characterization. Alternatives to the proposed activities have been considered in this analysis.

  12. Waste analysis plan for confirmation or completion of Tank Farms backlog waste designation

    SciTech Connect

    Not Available

    1993-08-01

    This waste analysis plan satisfies the requirements of Item 3 of Ecology Order 93NM-201 as amended per the Settlement Agreement. Item 3 states: ``Within forty (40) calendar days of receipt of this Order, the US Department of Energy Richland Operations (DOE-RL) and Westinghouse Hanford Company (WHC) shall provide Ecology with a plan for review and approval detailing the established criteria and procedures for waste inspection, segregation, sampling, designation, and repackaging of all containers reported in item {number_sign}1. The report shall include sampling plan criteria for different contaminated media, i.e., soils, compactable waste, high-efficiency particular air (HEPA) filters, etc., and a schedule for completing the work within the time allowed under this Order.`` Item 3 was amended per the Settlement Agreement as follows: ``In addition to the waste inspection plans for the ``unknowns`` previously provided and currently being supplemented, DOE-RL and WHC shall provide a draft waste analysis plan for the containers reported in Item 1 of the Order to Ecology by July 12, 1993. A final, DOE-RL approved waste analysis plan shall be submitted to Ecology by September 1, 1993, for Ecology`s written approval by September 15, 1993.`` Containers covered by the Order, Settlement Agreement, and this waste analysis plan consist of all those reported under Item 1 of the Order, less any containers that have been identified in unusual occurrences reported by Tank Farms. This waste analysis plan describes the procedures that will be undertaken to confirm or to complete designation of the solid waste identified in the Order.

  13. A safety assessment of rotary mode core sampling in flammable gas single shell tanks: Hanford Site, Richland, Washington

    SciTech Connect

    Raymond, R.E.

    1996-04-15

    This safety assessment (SA) addresses each of the required elements associated with the installation, operation, and removal of a rotary-mode core sampling (RMCS) device in flammable-gas single-shell tanks (SSTs). The RMCS operations are needed in order to retrieve waste samples from SSTs with hard layers of waste for which push-mode sampling is not adequate for sampling. In this SA, potential hazards associated with the proposed action were identified and evaluated systematically. Several potential accident cases that could result in radiological or toxicological gas releases were identified and analyzed and their consequences assessed. Administrative controls, procedures and design changes required to eliminate or reduce the potential of hazards were identified. The accidents were analyzed under nine categories, four of which were burn scenarios. In SSTS, burn accidents result in unacceptable consequences because of a potential dome collapse. The accidents in which an aboveground burn propagates into the dome space were shown to be in the ``beyond extremely unlikely`` frequency category. Given the unknown nature of the gas-release behavior in the SSTS, a number of design changes and administrative controls were implemented to achieve these low frequencies. Likewise, drill string fires and dome space fires were shown to be very low frequency accidents by taking credit for the design changes, controls, and available experimental and analytical data. However, a number of Bureau of Mines (BOM) tests must be completed before some of the burn accidents can be dismissed with high confidence. Under the category of waste fires, the possibility of igniting the entrapped gases and the waste itself were analyzed. Experiments are being conducted at the BOM to demonstrate that the drill bit is not capable of igniting the trapped gas in the waste. Laboratory testing and thermal analysis demonstrated that, under normal operating conditions, the drill bit will not create high

  14. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    SciTech Connect

    Higginson, M.C.

    1995-12-01

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ``as of date`` of June 30, 1995.

  15. Hanford radiological protection support services annual report for 1988

    SciTech Connect

    Lyon, M.; Fix, J.J.; Kenoyer, J.L.; Leonowich, J.A.; Palmer, H.E.; Sula, M.J.

    1989-06-01

    The report documents the performance of certain radiological protection sitewide services during calendar year (CY) 1988 by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy-Richland Operations Office (DOE-RL) and contractor activities on the Hanford Site. The routine program for each service is discussed along with any significant program changes and tasks, investigations, and studies performed in support of each program. Other related activities such as publications, presentations, and memberships on standard or industry committees are also listed. The programs covered provide services in the areas of (1) internal dosimetry, (2) in vivo measurements, (3) external dosimetry, (4) instrument calibration and evaluation, (5) calibration of radiation sources traceable to the National Institute of Standards and Technology (NIST) (formerly the National Bureau of Standards), and (6) radiological records. 23 refs., 15 figs., 15 tabs.

  16. Hanford radiological protection support services annual report for 1987

    SciTech Connect

    Lyon, M.; Fix, J.J.; Kenoyer, J.L.; Leonowich, J.A.; Palmer, H.E.; Sula, M.J.

    1988-08-01

    This report documents the performance of certain radiological protection sitewide services during calendar year (CY) 1987 by Pacific Northwest Laboratory in support of the US Department of Energy-Richland Operations Office (DOE-RL) and contractor activities on the Hanford Site. The routine program for each service is discussed along with any significant program changes and tasks, investigations, and studies performed in support of each program. Other related activities such as publications, presentations, and memberships on standards or industry committees are also discussed. The programs covered provide services in the areas of: external dosimetry, internal dosimetry, in vivo measurements, instrument calibration and evaluation, calibration of radiation sources traceable to the National Bureau of Standards, and radiological records. 21 refs., 10 figs., 12 tabs.

  17. Hanford Cultural Resources Laboratory annual report for fiscal year 1993

    SciTech Connect

    Last, G.V.; Wright, M.K.; Crist, M.E.; Cadoret, N.A.; Dawson, M.V.; Simmons, K.A.; Harvey, D.W.; Longenecker, J.G.

    1994-09-01

    The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Operations Office (DOE-RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Agency of 1979, the Native American Grave Protection and Repatriation Act of 1990, and the American Indian Religious Freedom Act of 1978. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the DOE-RL in compliance with federal statutes, regulations, and guidelines. For FY 1993, these tasks were to: conduct cultural resource reviews pursuant to Section 106 of the NHPA; monitor the condition of known historic properties; identify, recover, and inventory artifacts collected from the Hanford Site; educate the public about cultural resources values and the laws written to protect them; conduct surveys of the Hanford Site in accordance with Section 110 of the NHPA. Research also was conducted as a spin-off of these tasks and is reported here.

  18. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    SciTech Connect

    LUKE, S.N.

    1999-02-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs).

  19. Assessment of the Species Composition, Densities, and Distribution of Native Freshwater Mussels along the Benton County Shoreline of the Hanford Reach, Columbia River, 2004

    SciTech Connect

    Mueller, Robert P.; Tiller, Brett L.; Bleich, Matthew D.; Turner, Gerald; Welch, Ian D.

    2011-01-31

    The Hanford Reach of the Columbia River is the last unimpounded section of the river and contains substrate characteristics (cobble, gravel, sand/silt) suitable for many of the native freshwater mussels known to exist in the Pacific Northwest. Information concerning the native mussel species composition, densities, and distributions in the mainstem of the Columbia River is limited. Under funding from the U.S. Department of Energy Richland Operations Office (DOE-RL), Pacific Northwest National Laboratory conducted an assessment of the near-shore habitat on the Hanford Reach. Surveys conducted in 2004 as part of the Ecological Monitoring and Compliance project documented several species of native mussels inhabiting the near-shore habitat of the Hanford Reach. Findings reported here may be useful to resource biologists, ecologists, and DOE-RL to determine possible negative impacts to native mussels from ongoing near-shore remediation activities associated with Hanford Site cleanup. The objective of this study was to provide an initial assessment of the species composition, densities, and distribution of the freshwater mussels (Margaritiferidae and Unionidae families) that exist in the Hanford Reach. Researchers observed and measured 201 live native mussel specimens. Mussel density estimated from these surveys is summarized in this report with respect to near-shore habitat characteristics including substrate size, substrate embeddedness, relative abundance of aquatic vegetation, and large-scale geomorphic/hydrologic characteristics of the Hanford Reach.

  20. THE POSITIVE IMPACTS OF AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) FUNDING TO THE WASTE MANAGEMENT PROGRAM ON HANFORD'S PLATEAU REMEDIATION PROJECT

    SciTech Connect

    BLACKFORD LT

    2010-01-19

    In April 2009, the Department of Energy (DOE) Richland Operations Office (RL) was allocated $1.6 billion (B) in ARRA funding to be applied to cleanup projects at the Hanford Site. DOE-RL selected projects to receive ARRA funding based on 3-criteria: creating/saving jobs, reducing the footprint of the Hanford Site, and reducing life-cycle costs for cleanup. They further selected projects that were currently covered under regulatory documents and existing prime contracts, which allowed work to proceed quickly. CH2M HILL Plateau Remediation Company (CHPRC) is a prime contractor to the DOE focused on the environmental cleanup of the DOE Hanford Site Central Plateau. CHPRC was slated to receive $1.36B in ARRA funding. As of January, 2010, CHPRC has awarded over $200 million (M) in subcontracts (64% to small businesses), created more that 1,100 jobs, and touched more than 2,300 lives - all in support of long-term objectives for remediation of the Central Plateau, on or ahead of schedule. ARRA funding is being used to accelerate and augment cleanup activities already underway under the baseline Plateau Remediation Contract (PRC). This paper details challenges and accomplishments using ARRA funding to meet DOE-RL objectives of creating/saving jobs, expediting cleanup, and reducing lifecycle costs for cleanup during the first months of implementation.

  1. HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

    SciTech Connect

    CANNELL GR

    2009-11-19

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  2. The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

    SciTech Connect

    Lavender, John C.; Edwards, W. Scott; Macbeth, Paul J.; Self, Richard J.; West, Lori D.

    2012-07-01

    The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

  3. Westinghouse Hanford Company radiological protection dose summary and ALARA [As Low As Reasonably Achievable] goal report, calendar year 1989

    SciTech Connect

    Newcomb, J.L.; Hammond, D.A.

    1990-05-01

    Each year a Low As Reasonably Achievable (ALARA) goals are developed and reported to the Department of Energy, Richland Operations (DOE-RL). In addition to providing DOE-RL with goal status, these reports provide Westinghouse Hanford Company (WHC) management with a dose summary and status of annual ALARA goals. The CY-89 ALARA collective dose goal of 520 person-rem for compliance workers was easily met. A large contribution to the saved collective dose resulted from special ALARA practices and principles used by N Reactor during the tube inspection process which resulted in a significant reduction of 73 person-rem from the projected dose. No significant skin contaminations were incurred by WHC workers in CY-89. This report provide detailed information about the distribution of radiation dose and presents the apportionment of those doses to separate facilities. By combining the dose summary and the ALARA dosimetry goal status per facilities, some areas within specific WHC organizations were found no to be represented by ALARA teams. This caused some discrepancies in the report. These areas are clearly labeled in each organizational subsection with an asterisk. ALARA facility team chairs are currently investigating within their own organizations how to resolve representation for organizations. 11 figs., 6 tabs.

  4. Characterization of stored defense production spent nulcear fuel and associated materials at Hanford Site, Richland Washington: Environmental assessment

    SciTech Connect

    1995-03-01

    There are about 2,100 tonnes (2,300 tons) of defense production spent nuclear fuel stored in the 100-K Area Basins located along the south shore of the Columbia River in the northern part of the Hanford Site. Some of the fuel which has been in storage for a number of years is in poor condition and continues to deteriorate. The basins also contain fuel fragments and radioactively contaminated sludge. The DOE needs to characterize defense production spent nuclear fuel and associated materials stored on the Hanford Site. In order to satisfy that need, the Department of Energy (DOE) proposes to select, collect and transport samples of spent nuclear fuel and associated materials to the 327 Building for characterization. As a result of that characterization, modes of interim storage can be determined that would be compatible with the material in its present state and alternative treatment processes could be developed to permit a broader selection of storage modes. Environmental impacts of the proposed action were determined to be limited principally to radiation exposure of workers, which, however, were found to be small. No health effects among workers or the general public would be expected under routine operations. Implementation of the proposed action would not result in any impacts on cultural resources, threatened, endangered and candidate species, air or water quality, socioeconomic conditions, or waste management.

  5. Transfer of Plutonium-Uranium Extraction Plant and N Reactor irradiated fuel for storage at the 105-KE and 105-KW fuel storage basins, Hanford Site, Richland Washington

    SciTech Connect

    1995-07-01

    The U.S. Department of Energy (DOE) needs to remove irradiated fuel from the Plutonium-Uranium Extraction (PUREX) Plant and N Reactor at the Hanford Site, Richland, Washington, to stabilize the facilities in preparation for decontamination and decommissioning (D&D) and to reduce the cost of maintaining the facilities prior to D&D. DOE is proposing to transfer approximately 3.9 metric tons (4.3 short tons) of unprocessed irradiated fuel, by rail, from the PUREX Plant in the 200 East Area and the 105 N Reactor (N Reactor) fuel storage basin in the 100 N Area, to the 105-KE and 105-KW fuel storage basins (K Basins) in the 100 K Area. The fuel would be placed in storage at the K Basins, along with fuel presently stored, and would be dispositioned in the same manner as the other existing irradiated fuel inventory stored in the K Basins. The fuel transfer to the K Basins would consolidate storage of fuels irradiated at N Reactor and the Single Pass Reactors. Approximately 2.9 metric tons (3.2 short tons) of single-pass production reactor, aluminum clad (AC) irradiated fuel in four fuel baskets have been placed into four overpack buckets and stored in the PUREX Plant canyon storage basin to await shipment. In addition, about 0.5 metric tons (0.6 short tons) of zircaloy clad (ZC) and a few AC irradiated fuel elements have been recovered from the PUREX dissolver cell floors, placed in wet fuel canisters, and stored on the canyon deck. A small quantity of ZC fuel, in the form of fuel fragments and chips, is suspected to be in the sludge at the bottom of N Reactor`s fuel storage basin. As part of the required stabilization activities at N Reactor, this sludge would be removed from the basin and any identifiable pieces of fuel elements would be recovered, placed in open canisters, and stored in lead lined casks in the storage basin to await shipment. A maximum of 0.5 metric tons (0.6 short tons) of fuel pieces is expected to be recovered.

  6. The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

    SciTech Connect

    Feist, E.T.

    2012-07-01

    Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the

  7. FFTF operating experience, 1982-1984

    SciTech Connect

    Waldo, J B; Franz, G R; Loika, E F; Krupar, J J

    1984-01-01

    The Fast Flux Test Facility (FFTF) is a 400 Mwt sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US Liquid Metal Fast Breeder Reactor (LMFBR) program. Startup and initial power testing included a comprehensive series of nonnuclear and nuclear tests to verify the thermal, hydraulic, and neutronic characteristics of the plant. A specially designed series of natural circulation tests were then performed to demonstrate the inherent safety features of the plant. Early in 1982, the FFTF began its first 100-day irradiation cycle. Since that time the plant has operated very well, achieving a cycle capacity factor of 94% in the most recent irradiation cycle. Seventy-five specific test assemblies and 25,000 individual fuel pins have been irradiated, some in excess of 80 MWd/Kg.

  8. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    SciTech Connect

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences.

  9. State waste discharge permit application, 200-E chemical drain field

    SciTech Connect

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  10. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    SciTech Connect

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  11. Ecological Characterization Data for the 2004 Composite Analysis

    SciTech Connect

    Downs, Janelle L.; Simmons, Mary A.; Stegen, Jennifer A.; Bunn, Amoret L.; Tiller, Brett L.; Thorsten, Susan L.; Zufelt, Rhett K.

    2004-11-01

    A composite analysis is required by U.S. Department of Energy (DOE) Order 435.1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site. The original Hanford Site Composite Analysis of 1998 must be revised and submitted to DOE Headquarters (DOE-HQ) in 2004 because of revisions to waste site information in the 100, 200, and 300 Areas, updated performance assessments and environmental impact statements (EIS), changes in inventory estimates for key sites and constituents, and a change in the definition of offsite receptors. Beginning in fiscal year (FY) 2003, the DOE Richland Operations Office (DOE-RL) initiated activities, including the development of data packages, to support the 2004 Composite Analysis. This report describes the data compiled in FY 2003 to support ecological site assessment modeling for the 2004 Composite Analysis. This work was conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project (formerly the Groundwater Protection Program) managed by Fluor Hanford, Inc., Richland, Washington. The purpose of this report is to provide summaries of the characterization information and available spatial data on the biological resources and ecological receptors found in the upland, riparian, aquatic, and island habitats on the Hanford Site. These data constitute the reference information used to establish parameters for the ecological risk assessment module of the System Assessment Capability and other assessment activities requiring information on the presence and distribution of biota on the Hanford Site.

  12. Hanford Site Environmental Surveillance Master Sampling Schedule

    SciTech Connect

    LE Bisping

    1999-02-12

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations.

  13. Hanford Site Environmental Surveillance Master Sampling Schedule

    SciTech Connect

    LE Bisping

    2000-01-27

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection.

  14. Hanford site environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 {open_quotes}General Environmental Protection Program,{close_quotes} and DOE Order 5400.5, {open_quotes}Radiation Protection of the Public and the Environment.{close_quotes} The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations.

  15. Applying Lean Concepts to Waste Site Closure - 13137

    SciTech Connect

    Proctor, M.L.

    2013-07-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  16. Vadose Zone Hydrogeology Data Package for Hanford Assessments

    SciTech Connect

    Last, George V.; Freeman, Eugene J.; Cantrell, Kirk J.; Fayer, Michael J.; Gee, Glendon W.; Nichols, William E.; Bjornstad, Bruce N.; Horton, Duane G.

    2006-06-01

    This data package documents the technical basis for selecting physical and geochemical parameters and input values that will be used in vadose zone modeling for Hanford assessments. This work was originally conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project managed by Fluor Hanford, Inc., Richland, Washington, and revised as part of the Characterization of Systems Project managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy, Richland Operations Office (DOE-RL). This data package describes the geologic framework, the physical, hydrologic, and contaminant transport properties of the geologic materials, and deep drainage (i.e., recharge) estimates, and builds on the general framework developed for the initial assessment conducted using the System Assessment Capability (SAC) (Bryce et al. 2002). The general approach for this work was to update and provide incremental improvements over the previous SAC data package completed in 2001. As with the previous SAC data package, much of the data and interpreted information were extracted from existing documents and databases. Every attempt was made to provide traceability to the original source(s) of the data or interpretations.

  17. Five years operating experience at the Fast Flux Test Facility

    SciTech Connect

    Baumhardt, R. J.; Bechtold, R. A.

    1987-04-01

    The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.

  18. System-Scale Model of Aquifer, Vadose Zone, and River Interactions for the Hanford 300 Area - Application to Uranium Reactive Transport

    SciTech Connect

    Rockhold, Mark L.; Bacon, Diana H.; Freedman, Vicky L.; Parker, Kyle R.; Waichler, Scott R.; Williams, Mark D.

    2013-10-01

    This report represents a synthesis and integration of basic and applied research into a system-scale model of the Hanford 300 Area groundwater uranium plume, supported by the U.S. Department of Energy’s Richland Operations (DOE-RL) office. The report integrates research findings and data from DOE Office of Science (DOE-SC), Office of Environmental Management (DOE-EM), and DOE-RL projects, and from the site remediation and closure contractor, Washington Closure Hanford, LLC (WCH). The three-dimensional, system-scale model addresses water flow and reactive transport of uranium for the coupled vadose zone, unconfined aquifer, and Columbia River shoreline of the Hanford 300 Area. The system-scale model of the 300 Area was developed to be a decision-support tool to evaluate processes of the total system affecting the groundwater uranium plume. The model can also be used to address “what if” questions regarding different remediation endpoints, and to assist in design and evaluation of field remediation efforts. For example, the proposed cleanup plan for the Hanford 300 Area includes removal, treatment, and disposal of contaminated sediments from known waste sites, enhanced attenuation of uranium hot spots in the vadose and periodically rewetted zone, and continued monitoring of groundwater with institutional controls. Illustrative simulations of polyphosphate infiltration were performed to demonstrate the ability of the system-scale model to address these types of questions. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints.

  19. Environmental assessment: Solid waste retrieval complex, enhanced radioactive and mixed waste storage facility, infrastructure upgrades, and central waste support complex, Hanford Site, Richland, Washington

    SciTech Connect

    1995-09-01

    The U.S. Department of Energy (DOE) needs to take action to: retrieve transuranic (TRU) waste because interim storage waste containers have exceeded their 20-year design life and could fail causing a radioactive release to the environment provide storage capacity for retrieved and newly generated TRU, Greater-than-Category 3 (GTC3), and mixed waste before treatment and/or shipment to the Waste Isolation Pilot Project (WIPP); and upgrade the infrastructure network in the 200 West Area to enhance operational efficiencies and reduce the cost of operating the Solid Waste Operations Complex. This proposed action would initiate the retrieval activities (Retrieval) from Trench 4C-T04 in the 200 West Area including the construction of support facilities necessary to carry out the retrieval operations. In addition, the proposed action includes the construction and operation of a facility (Enhanced Radioactive Mixed Waste Storage Facility) in the 200 West Area to store newly generated and the retrieved waste while it awaits shipment to a final disposal site. Also, Infrastructure Upgrades and a Central Waste Support Complex are necessary to support the Hanford Site`s centralized waste management area in the 200 West Area. The proposed action also includes mitigation for the loss of priority shrub-steppe habitat resulting from construction. The estimated total cost of the proposed action is $66 million.

  20. Science and Technology Operations Annual Evaluation of PNNL Environment, Health and Safety, and Facility Operations Performance for FY 1999

    SciTech Connect

    CHRISTENSEN, R.F.

    2000-01-24

    The framework required by P450 5 is clearly in place and includes regular interaction with DOE-RL. There is also a good balance between contractor DOE and other external oversight interactions. The integrated assessment program is fully capable of uncovering weaknesses in performance (e.g. compliance) This point is evidenced by the fact that the contractor has identified most if not all issues prior to that of external sources. However there are also areas for improvement. Self assessments need to be better connected to overall strategy. Varying levels of maturity across management systems exist regarding there ability to assess deployment. There is a need to improve the ability to prioritize and respond to identified opportunities for improvement. There is also a need to improve the integration of assessment results from multiple Self-Assessment plans as well as to improve the integration of the performance of assessments. Finally the partnership between DOE-RL and Battelle must continue to improve DOE RL s development of an appraisal plan early in the fiscal year working in close conjunction with the contractor can further strengthen the assessment program and help ensure that there is the right balance between contractor and external oversight activities and that such activities are focused toward appropriate issues.

  1. B Plant Complex preclosure work plan

    SciTech Connect

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  2. TECHNICAL EVALUATION OF THE SAFE TRANSPORTATION OF WASTE CONTAINERS COATED WITH POLYUREA

    SciTech Connect

    VAIL, T.S.

    2007-03-30

    This technical report is to evaluate and establish that the transportation of waste containers (e.g. drums, wooden boxes, fiberglass-reinforced plywood (FRP) or metal boxes, tanks, casks, or other containers) that have an external application of polyurea coating between facilities on the Hanford Site can be achieved with a level of onsite safety equivalent to that achieved offsite. Utilizing the parameters, requirements, limitations, and controls described in the DOE/RL-2001-36, ''Hanford Sitewide Transportation Safety Document'' (TSD) and the Department of Energy Richland Operations (DOE-RL) approved package specific authorizations (e.g. Package Specific Safety Documents (PSSDs), One-Time Requests for Shipment (OTRSs), and Special Packaging Authorizations (SPAS)), this evaluation concludes that polyurea coatings on packages does not impose an undue hazard for normal and accident conditions. The transportation of all packages on the Hanford Site must comply with the transportation safety basis documents for that packaging system. Compliance with the requirements, limitations, or controls described in the safety basis for a package system will not be relaxed or modified because of the application of polyurea. The inspection criteria described in facility/projects procedures and work packages that ensure compliance with Container Management Programs and transportation safety basis documentation dictate the need to overpack a package without consideration for polyurea. This technical report reviews the transportation of waste packages coated with polyurea and does not credit the polyurea with enhancing the structural, thermal, containment, shielding, criticality, or gas generating posture of a package. Facilities/Projects Container Management Programs must determine if a container requires an overpack prior to the polyurea application recognizing that circumstances newly discovered surface contamination or loss of integrity may require a previously un

  3. Pollution Prevention and Best Management Practices Plan for State Waste Discharge Permits ST-4508 - ST-4509 and ST-4510

    SciTech Connect

    WILLIAMS, J.F.

    2000-01-01

    On December 23, 1991, the U.S. Department of Energy, Richland Operations Office (DOE-RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM- 177 (Consent Order). The Consent Order lists regulatory milestones for liquid effluent streams on the Hanford Site to comply with the permitting requirements of Washington Administrative Code (WAC) 173-216, State Waste Discharge Permit Program, or WAC 173-21 8, Washington Underground Injection Control Program, where applicable. Hanford Site liquid effluent streams discharging to the soil column are categorized in the Consent Order as follows: Phase I Streams; Phase II Streams; and Miscellaneous Streams. Phase I and Phase II Streams are addressed in two reports: Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site (DOE-RL 1987), and Annual Status of the Report of the Plan and schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site (WHC-EP-0196-1). There originally were 33 Phase I and Phase II Streams; however, some streams have been eliminated. Miscellaneous streams are those liquid effluent streams discharged to the ground that arc not categorized as Phase I or Phase II Streams. Source waters of miscellaneous streams originate directly from the Columbia River, from treated Columbia River water, or from groundwater and demineralized water. Miscellaneous streams result primarily from source water used in processes such as cooling, hydrotesting, and steam generation. Miscellaneous streams also occur through the use of these source waters for maintenance and construction activities such as draining, flushing, and washing. Miscellaneous streams discharging to the soil column on the Hanford Site were subject to the requirements of several milestones identified in the Consent Order (DE 91NM-177). The Plan and Schedule for Disposition and Regulatory

  4. Letter report: Title listing of daily operating data on Hanford single-pass reactors, 1944--1971

    SciTech Connect

    Gydesen, S.P.

    1992-02-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that populations and individuals could have received as a result of emissions from Hanford Site operations since 1944, with descriptions of the uncertainties inherent in such estimates. A secondary objective is to make project documentation and Hanford-originated references used in the reports available to the public. Hanford-originated documents of potential interest and/or use to the HEDR Project are made publicly available through the US Government's National Technical Information Service and placed in the US Department of Energy Richland Field Office (RL) Public Reading Room in Richland, Washington. Project work is conducted under several technical tasks, among which is the Source Terms Task. Under this task, estimates of radioactive emissions from Hanford facilities since 1944 are developed. These estimates are based on historical measurements and production information. The Information Resources Task identifies and retrieves historical production operating information for developing source terms. The purpose of this letter report is to identify documents that record daily reactor operating information at the Hanford Site for the years 1944--1971. Complete bibliographic citations and sample pages from each different format for Hanford reactor operations data are included.

  5. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    SciTech Connect

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  6. Structural acceptance criteria for the evaulation of existing double-shell waste storage tanks located at the Hanford site, Richland, Washington

    SciTech Connect

    Julyk, L.J.; Day, A.D.; Dyrness, A.D.; Moore, C.J.; Peterson, W.S.; Scott, M.A.; Shrivastava, H.P.; Sholman, J.S.; Watts, T.N.

    1995-09-01

    The structural acceptance criteria contained herein for the evaluation of existing underground double-shell waste storage tanks located at the Hanford Site is part of the Life Management/Aging Management Program of the Tank Waste Remediation System. The purpose of the overall life management program is to ensure that confinement of the waste is maintained over the required service life of the tanks. Characterization of the present condition of the tanks, understanding and characterization of potential degradation mechanisms, and development of tank structural acceptance criteria based on previous service and projected use are prerequisites to assessing tank integrity, to projecting the length of tank service, and to developing and applying prudent fixes or repairs. The criteria provided herein summarize the requirements for the analysis and structural qualification of the existing double-shell tanks for continued operation. Code reconciliation issues and material degradation under aging conditions are addressed. Although the criteria were developed for double-shell tanks, many of the provisions are equally applicable to single-shell tanks. However, the criteria do not apply to the evaluation of tank appurtenances and buried piping.

  7. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    SciTech Connect

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program.

  8. Restart oversight assessment of Hanford 242-A evaporator: Summary report

    SciTech Connect

    Not Available

    1994-08-01

    This report summarizes a January 17--28, 1994, oversight assessment of restart activities for the 242-A Evaporator at the US Department of Energy`s (DOE`s) Hanford Site about 25 miles northeast of Hanford, Washington. The assessment was conducted by qualified staff and consultants from the DOE Office of Environment, Safety and Health (EH). Its focus was the readiness of the facility for the resumption of safe operations, in particular those operations involved in the treatment and disposal of condensate from the evaporation of liquid radioactive waste, a key element of the tank waste remediation project administered by the DOE Richland Operations Office (DOE-RL). Overall, the assessment yielded eight programmatic concerns, supported by 38 individual findings. Of the concerns, four have already been closed, and the other four have been resolved. Results pointed up strengths in management and engineering design, as well as effective support of facility training programs by the management and operating contractor, Westinghouse Hanford Company (WHC). Weaknesses were evident, however, in conduct of operations, maintenance, and radiological practices. Furthermore, problems in the submittal and approval of Compliance Schedule Approvals--that is, WHC documentation of the status of compliance with DOE orders--were indicative of a programmatic breakdown in the DOE Order compliance process. According to the results of this assessment, there are no safety and health issues that would preclude or delay restart of the evaporator.

  9. Hanford Site air operating permit application

    SciTech Connect

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  10. Hanford facility dangerous waste permit application, low-level burial grounds

    SciTech Connect

    Engelmann, R.H.

    1997-08-12

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  11. Hanford facility dangerous waste permit application, PUREX storage tunnels

    SciTech Connect

    Haas, C. R.

    1997-09-08

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24).

  12. Restart oversight assessment of Hanford 242-A evaporator: Technical report

    SciTech Connect

    Lagdon, R.; Lasky, R.

    1994-08-01

    An assessment team from the Office of Environment, Safety and Health (EH), US Department of Energy (DOE), conducted an independent assessment of the 242-A Evaporator at the Hanford Site during January 17--28, 1994. An EH team member remained on-site following the assessment to track corrective actions and resolve prestart findings. The primary objective of this assessment was independent assurance that the DOE Office of Environmental Management (EM), the DOE Richland Operations Office (DOE-RL), and Westinghouse Hanford Company (WHC) can safely restart the evaporator. Another objective of the EH team was to assess EM`s Operational Readiness Evaluation (ORE) to determine if the programs, procedures, and management systems implemented for operation of the 241-A Evaporator ensure the protection of worker safety and health. The following section of this report provides background information on the 242-A Evaporator and Operational Readiness Review (ORR) activities conducted to date. The next chapter is divided into sections that address the results of discrete assessment activities. Each section includes a brief statement of conclusions for the functional area in question, descriptions of the review bases and methods, and a detailed discussion of the results. Concerns identified during the assessment are listed for the section to which they apply, and the specific findings upon which the concern is based can be found immediately thereafter.

  13. Letter report: Title listing of daily operating data on Hanford single-pass reactors, 1944--1971. Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Gydesen, S.P.

    1992-02-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that populations and individuals could have received as a result of emissions from Hanford Site operations since 1944, with descriptions of the uncertainties inherent in such estimates. A secondary objective is to make project documentation and Hanford-originated references used in the reports available to the public. Hanford-originated documents of potential interest and/or use to the HEDR Project are made publicly available through the US Government`s National Technical Information Service and placed in the US Department of Energy Richland Field Office (RL) Public Reading Room in Richland, Washington. Project work is conducted under several technical tasks, among which is the Source Terms Task. Under this task, estimates of radioactive emissions from Hanford facilities since 1944 are developed. These estimates are based on historical measurements and production information. The Information Resources Task identifies and retrieves historical production operating information for developing source terms. The purpose of this letter report is to identify documents that record daily reactor operating information at the Hanford Site for the years 1944--1971. Complete bibliographic citations and sample pages from each different format for Hanford reactor operations data are included.

  14. Hanford whole body counting manual

    SciTech Connect

    Palmer, H.E.; Rieksts, G.A.; Lynch, T.P.

    1990-06-01

    This document describes the Hanford Whole Body Counting Program as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy--Richland Operations Office (DOE-RL) and its Hanford contractors. Program services include providing in vivo measurements of internally deposited radioactivity in Hanford employees (or visitors). Specific chapters of this manual deal with the following subjects: program operational charter, authority, administration, and practices, including interpreting applicable DOE Orders, regulations, and guidance into criteria for in vivo measurement frequency, etc., for the plant-wide whole body counting services; state-of-the-art facilities and equipment used to provide the best in vivo measurement results possible for the approximately 11,000 measurements made annually; procedures for performing the various in vivo measurements at the Whole Body Counter (WBC) and related facilities including whole body counts; operation and maintenance of counting equipment, quality assurance provisions of the program, WBC data processing functions, statistical aspects of in vivo measurements, and whole body counting records and associated guidance documents. 16 refs., 48 figs., 22 tabs.

  15. Evaluation of the Hanford RI/FS cost projections

    SciTech Connect

    Not Available

    1991-06-01

    The US Department of Energy-Richland Operations (DOE-RL) tasked the Environmental Management Operations (EMO) to review the cost estimates and implementation process for the Hanford Remedial Investigation/Feasibility Study (RI/FS) Program as defined by the Hanford RCRA/CERCLA Past Particles Cost Model. The purpose of the review was to determine if there were opportunities to reduce the RI/FS costs at Hanford, with a focus on the approach being taken at Hanford to implement and complete the RI/FS process. Three specific tasks comprised the review. The first focused on the cost model assumptions to assess whether the assumptions and resulting estimates were representative of the cost of performing work at Hanford. The second involved a detailed review of the regulatory and other driving forces that define the scope and approach to be taken at Hanford. The purpose of the review was to develop recommendations on changes what would help streamline the past practices process and reduce the cost and schedule. The third (Task 1C) provided a review of the scope and approach planned for two operable units (OUs), 100-HR-1 and 100-HR-3, as contained in their detailed draft RI/FS work plans. These work plans were reviewed for appropriate application of and conformance to the regulations and other requirements examined in the first two tasks. 4 refs.

  16. Hanford Site Sustainability Program, Richland, Washington - 12464

    SciTech Connect

    Fritz, Lori

    2012-07-01

    In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan [1] was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site has made significant progress in the area of environmental stewardship through multiple initiatives to reduce energy consumption and GHG emissions, despite increased demands in those areas due to accelerated cleanup work driven by ARRA funding. Future plans, contingent on available funding, include additional enhancements in the areas of fleet management, including installation of additional charging stations and continued acquisition of alternate fueled vehicles, implementation of one or more of the recommendations from the Feasibility Study on reducing GHG emissions from employee commuting, and potential diversion of solid waste from on-site landfills. (author)

  17. HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

    SciTech Connect

    FRITZ LL

    2012-01-12

    In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

  18. A team leadership approach to managing the transition from construction to operations for an environmental project

    SciTech Connect

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project.

  19. GrayQbTM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

    SciTech Connect

    Plummer, J. R.; Immel, D. M.; Serrato, M. G.; Dalmaso, M. J.; Shull, D. J.

    2015-11-18

    The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQbTM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQbTM SF2 (Single Faced Version 2) is a non-destructive examination device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.

  20. Environmental Management Performance Report June 2000

    SciTech Connect

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  1. Environmental Management Performance Report March 2000

    SciTech Connect

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  2. Environmental Management Performance Report September 2000

    SciTech Connect

    EDER, D.M.

    2000-09-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2000. All other information is updated as of August 24, unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable.

  3. Management plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  4. State Waste Discharge Permit application, 100-N Sewage Lagoon

    SciTech Connect

    Not Available

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

  5. Operation PLUMBBOB. Operational Summary

    DTIC Science & Technology

    1979-10-01

    General 65 9.2 Organization 65 9.3 Observer Categories 65 9.3.1 Official Observers 65 9.3.2 Employee Observers 65 9.3.3 FCDA Observers...Operational, Training and Troop Observer participation in Operation PILGRIM. d. Coordinate FCDA participation in the Military Effects Test Program. 7...Test Group (CETG), Federal Civil Defense Administration ( FCDA ), structures projects. Also, the DOD dome and arch Project 3.6 and related FCDA dome

  6. Public comments and responses to the 1993 Hanford cleanup five-year plan

    SciTech Connect

    Not Available

    1993-08-01

    In March 1993, the US Department of Energy, Richland Operations Office (DOE-RL) published its annual Site-Specific Five-Year Plan. The Site-Specific Plan is published to inform the public about the background, status, and plans for Environmental Restoration (ER) and Waste Management (WM) activities at the Hanford site. It is the only document that seeks to bring all ER and WM elements together in one document. The Site-Specific Plan is a companion document to the National Five-Year Plan that deals with all the sites within the DOE complex on a summary level. This Response to Comments document does not try to address every question or concern raised during the public comment period. Some questions were outside the scope of the Five-Year Plan, some we could not decipher, others were variations of the same question. The initial round of public meetings was held in Portland, Oregon, and Seattle, Pasco, and Olympia, Washington. At the request of the Oregon Department of Energy (ODOE) and the Washington State Department of Ecology (Ecology), a second round of meetings was held in Portland and Olympia. Both agencies felt that the first two meetings were held with too little advance notice, and before the Plan could be distributed. Once the public meetings were over and the comment period closed, we then compiled the public comments, largely from audio tapes of the meetings. Individual functions within Hanford were asked to consider and respond to the comments.

  7. Vadose zone characterization project at the Hanford Tank Farms: BY Tank Farm report

    SciTech Connect

    Kos, S.E.

    1997-02-01

    The US Department of Energy Grand Junction Office (GJO) was tasked by the DOE Richland Operations Office (DOE-RL) to perform a baseline characterization of the contamination distributed in the vadoze zone sediment beneath and around the single-shell tanks (SSTs) at the Hanford Site. The intent of this characterization is to determine the nature and extent of the contamination, to identify contamination sources, and to develop a baseline of the contamination distribution that will permit future data comparisons. This characterization work also allows an initial assessment of the impacts of the vadose zone contamination as required by the Resource Conservation and Recovery Act (RCRA). This characterization project involves acquiring information about the vadose zone contamination with borehole geophysical logging methods and documenting that information in a series of reports. Data from boreholes surrounding each tank are compiled into individual Tank Summary Data Reports. The data from each tank farm are then compiled and summarized in a Tank Farm Report. This document is the Tank Farm Report for the BY Tank Farm.

  8. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  9. MANAGING HANFORD'S LEGACY NO-PATH-FORWARD WASTES TO DISPOSITION

    SciTech Connect

    WEST LD

    2011-01-13

    The U.S. Department of Energy (DOE) Richland Operations Office (RL) has adopted the 2015 Vision for Cleanup of the Hanford Site. This vision will protect the Columbia River, reduce the Site footprint, and reduce Site mortgage costs. The CH2M HILL Plateau Remediation Company's (CHPRC) Waste and Fuels Management Project (W&FMP) and their partners support this mission by providing centralized waste management services for the Hanford Site waste generating organizations. At the time of the CHPRC contract award (August 2008) slightly more than 9,000 m{sup 3} of waste was defined as 'no-path-forward waste.' The majority of these wastes are suspect transuranic mixed (TRUM) wastes which are currently stored in the low-level Burial Grounds (LLBG), or stored above ground in the Central Waste Complex (CWC). A portion of the waste will be generated during ongoing and future site cleanup activities. The DOE-RL and CHPRC have collaborated to identify and deliver safe, cost-effective disposition paths for 90% ({approx}8,000 m{sup 3}) of these problematic wastes. These paths include accelerated disposition through expanded use of offsite treatment capabilities. Disposal paths were selected that minimize the need to develop new technologies, minimize the need for new, on-site capabilities, and accelerate shipments of transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico.

  10. Hanford Site waste minimization and pollution prevention awareness program plan

    SciTech Connect

    Place, B.G.

    1998-09-24

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site`s pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office`s (RL`s) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program.

  11. Analytical services contract reform alternatives project

    SciTech Connect

    Hunt, J.W.; Fox, M.R.; Kristofzski, J.G.; Minette, M.J.

    1995-03-23

    Westinghouse Hanford Company (WHC) was directed by the U.S. Department of Energy, Richland Operations Office (DOE-RL) to examine the feasibility of outsourcing all or part of its laboratory and analytical functions as part of a contract reform effort. The analytical services provided by WHC were found to be significantly greater than that of a typical environmental laboratory which provides sample analysis based on a simple sample in-report out model. In addition to high-volume production analysis, the work scope includes special analytical services, technical consulting, sample handling and disposition, and special material preparations. Numerous broad ranging potential contract reform alternatives were identified and categorized into seven main alternatives with associated sub-alternatives. Issues associated with each alternative varied significantly depending on the alternative. Fifteen issues were identified and described including human resources, contract, and procurement areas. Readers of this report will perhaps identify additional alternatives and/or issues. In addressing the issues, it was determined that those issues pertaining to labor relations and procurement require major policy resolutions by WHC/DOE senior management prior to being able to establish meaningful assumptions for cost/benefit analyses of the seven alternatives. Further review was therefore stopped without economic analyses or recommendation for any specific alternative. Accordingly, this report is intended to fulfill the requirements of RL Milestone AS-95-016.

  12. Performance Assessment Monitoring Plan for the Hanford Site Low Level Waste Burial Grounds

    SciTech Connect

    SONNICHSEN, J.C.

    2000-11-15

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  13. Harnessing federal environmental expertise and focusing it on streamlining characterization and remediation at DOE`s Hanford Site

    SciTech Connect

    Erickson, J.K.; Kane, D.A.; McGarry, T.A.

    1993-03-01

    At the US Department of Energy, Richland Field Office (DOE-RL) Hanford Site, environmental restoration is conducted under a Tri-Party Federal Facility Agreement between DOE-RL, the Environmental Protection Agency (EPA) and the Washington State Department of Ecology (Ecology). One result of a dispute resolution was the requirement to conduct an independent review of the policies, procedures, processes, and work practices associated with remedial investigation/feasibility study (RI/FS) activity at Hanford with a goal of reducing it to 30 months. Sixteen experienced and respected federal Environmental Restoration Program/Project Managers were brought to Hanford for a two-week intensive review of the program. This paper outlines the reasons for this tactic, the mechanics of funding the process, and the benefits of this unique approach.

  14. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  15. Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation

    SciTech Connect

    Conrads, T.J.

    1997-09-12

    Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well as for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford

  16. DISSS/PSDB - Personnel Security Database Modernization Project: Compilation of data gathered from DOE Operations Office`s site visits

    SciTech Connect

    Carpenter, R.; Sweeney, D.

    1995-03-15

    This document is a compilation of the information gathered from visits to the DOE Operations Offices. The purpose of these visits was to gather requirements for the modernization of the personnel security database. The initial phase of visits were to sites which had known local systems to augment CPCI. They were; Rocky Flats, Richland, Las Vegas, Savannah River, Oak Ridge, and Oakland. The second phase of site visits were to; Headquarters, Schenectady, Pittsburgh, Idaho Falls, Chicago, and Albuquerque. We also visited the NRC. At each site we reviewed the current clearance process in use at the field office. If the site had a local personnel security database (PSDB), we also reviewed the current PSDB processing. Each meeting was began with the a discussion on the purpose of the meeting and the background of the redesign effort.

  17. Environmental Restoration Remedial Action Quality Assurance Requirements Document

    SciTech Connect

    Cote, R.F.

    1991-09-01

    The Environmental Restoration Remedial Action Quality Assurance Requirements Document defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. 18 refs.

  18. Transition operators

    NASA Astrophysics Data System (ADS)

    Alcock-Zeilinger, J.; Weigert, H.

    2017-05-01

    In this paper, we give a generic algorithm of the transition operators between Hermitian Young projection operators corresponding to equivalent irreducible representations of 𝖲𝖴 (N ) , using the compact expressions of Hermitian Young projection operators derived in the work of Alcock-Zeilinger and Weigert [eprint arXiv:1610.10088 [math-ph

  19. 216-B-3 expansion ponds closure plan

    SciTech Connect

    Not Available

    1994-10-01

    This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

  20. Schwartz operators

    NASA Astrophysics Data System (ADS)

    Keyl, M.; Kiukas, J.; Werner, R. F.

    2016-05-01

    In this paper, we introduce Schwartz operators as a non-commutative analog of Schwartz functions and provide a detailed discussion of their properties. We equip them, in particular, with a number of different (but equivalent) families of seminorms which turns the space of Schwartz operators into a Fréchet space. The study of the topological dual leads to non-commutative tempered distributions which are discussed in detail as well. We show, in particular, that the latter can be identified with a certain class of quadratic forms, therefore making operations like products with bounded (and also some unbounded) operators and quantum harmonic analysis available to objects which are otherwise too singular for being a Hilbert space operator. Finally, we show how the new methods can be applied by studying operator moment problems and convergence properties of fluctuation operators.

  1. Crew operations

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The requirements for the activities involved, and the procedures used by the crew in the operations of the modular space station are presented. All crew-related characteristics of the station and its operations are indicated. The interior configuration and arrangement of each of the space station modules, the facilities and equipment in the module and their operation are described as related to crew habitability. The crew activities and procedures involved in the operation of the station in the accomplishment of its primary mission are defined. The operations involved in initial station buildup, and the on-orbit operation and maintenance of the station and its subsystems to support the experimental program are included. A general description of experiment operations is also given.

  2. 2401-W Waste storage building closure plan

    SciTech Connect

    LUKE, S.M.

    1999-07-15

    This plan describes the performance standards met and closure activities conducted to achieve clean closure of the 2401-W Waste Storage Building (2401-W) (Figure I). In August 1998, after the last waste container was removed from 2401-W, the U.S. Department of Energy, Richland Operations Office (DOE-RL) notified Washington State Department of Ecology (Ecology) in writing that the 2401-W would no longer receive waste and would be closed as a Resource Conservation and Recovery Act (RCRA) of 1976 treatment, storage, and/or disposal (TSD) unit (98-EAP-475). Pursuant to this notification, closure activities were conducted, as described in this plan, in accordance with Washington Administrative Code (WAC) 173-303-610 and completed on February 9, 1999. Ecology witnessed the closure activities. Consistent with clean closure, no postclosure activities will be necessary. Because 2401-W is a portion of the Central Waste Complex (CWC), these closure activities become the basis for removing this building from the CWC TSD unit boundary. The 2401-W is a pre-engineered steel building with a sealed concrete floor and a 15.2-centimeter concrete curb around the perimeter of the floor. This building operated from April 1988 until August 1998 storing non-liquid containerized mixed waste. All waste storage occurred indoors. No potential existed for 2401-W operations to have impacted soil. A review of operating records and interviews with cognizant operations personnel indicated that no waste spills occurred in this building (Appendix A). After all waste containers were removed, a radiation survey of the 2401-W floor for radiological release of the building was performed December 17, 1998, which identified no radiological contamination (Appendix B).

  3. Operating Systems.

    ERIC Educational Resources Information Center

    Denning, Peter J.; Brown, Robert L.

    1984-01-01

    A computer operating system spans multiple layers of complexity, from commands entered at a keyboard to the details of electronic switching. In addition, the system is organized as a hierarchy of abstractions. Various parts of such a system and system dynamics (using the Unix operating system as an example) are described. (JN)

  4. Operants1

    PubMed Central

    Schick, Karl

    1971-01-01

    The definition of an operant as a response class each of whose members possesses the property upon which reinforcement is contingent is not broad enough to cover the units that are supposed in Skinner's accounts of extinction, superstition, and transfer of learning. A broader definition is suggested. Finally, properties defining operants are discussed. PMID:16811526

  5. Operational Amplifiers.

    ERIC Educational Resources Information Center

    Foxcroft, G. E.

    1986-01-01

    Addresses the introduction of low cost equipment into high school and college physical science classes. Examines the properties of an "ideal" operational amplifier and discusses how it might be used under saturated and non-saturated conditions. Notes the action of a "real" operational amplifier. (TW)

  6. Payload Operations

    NASA Technical Reports Server (NTRS)

    Cissom, R. D.; Melton, T. L.; Schneider, M. P.; Lapenta, C. C.

    1999-01-01

    The objective of this paper is to provide the future ISS scientist and/or engineer a sense of what ISS payload operations are expected to be. This paper uses a real-time operations scenario to convey this message. The real-time operations scenario begins at the initiation of payload operations and runs through post run experiment analysis. In developing this scenario, it is assumed that the ISS payload operations flight and ground capabilities are fully available for use by the payload user community. Emphasis is placed on telescience operations whose main objective is to enable researchers to utilize experiment hardware onboard the International Space Station as if it were located in their terrestrial laboratory. An overview of the Payload Operations Integration Center (POIC) systems and user ground system options is included to provide an understanding of the systems and interfaces users will utilize to perform payload operations. Detailed information regarding POIC capabilities can be found in the POIC Capabilities Document, SSP 50304.

  7. Warehousing Operations.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    Developed as part of the Marine Corps Institute (MCI) correspondence training program, this course on warehousing operations is designed to provide instruction in the procedures used in warehousing operations. Introductory materials include specific information for MCI students and a study guide (guidelines to complete the course). The 22-hour…

  8. Operation REDWING

    DTIC Science & Technology

    1956-07-31

    only 16mm cinemascope films would be available after 1 August 1956t Act- tion was taken to modify the screens of the Terrace and Starlite theaters...approximately 900, was in operation throughout the interim and operational period. The Starlite Theater, which seats approximately 600, opened in

  9. Business & Operations

    ERIC Educational Resources Information Center

    Agron, Joe

    2007-01-01

    This article presents an interview with John D. Musso, executive director of the Association of School Business Officials (ASBO) International. Musso talks about trends and issues that will most affect school business and operations in 2007 and beyond. Despite the challenges facing school operations, he believes that the key to being successful at…

  10. Operational Amplifiers.

    ERIC Educational Resources Information Center

    Foxcroft, G. E.

    1986-01-01

    Addresses the introduction of low cost equipment into high school and college physical science classes. Examines the properties of an "ideal" operational amplifier and discusses how it might be used under saturated and non-saturated conditions. Notes the action of a "real" operational amplifier. (TW)

  11. Radioactive Air Emissions Notice of Construction for the 105-KW Basin integrated water treatment system filter vessel sparging vent

    SciTech Connect

    Kamberg, L.D.

    1998-02-23

    This document serves as a notice of construction (NOC), pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060, and as a request for approval to construct, pursuant to 40 Code of Federal Regulations (CFR) 61.07, for the Integrated Water Treatment System (IWTS) Filter Vessel Sparging Vent at 105-KW Basin. Additionally, the following description, and references are provided as the notices of startup, pursuant to 40 CFR 61.09(a)(1) and (2) in accordance with Title 40 Code of Federal Regulations, Part 61, National Emission Standards for Hazardous Air Pollutants. The 105-K West Reactor and its associated spent nuclear fuel (SNF) storage basin were constructed in the early 1950s and are located on the Hanford Site in the 100-K Area about 1,400 feet from the Columbia River. The 105-KW Basin contains 964 Metric Tons of SNF stored under water in approximately 3,800 closed canisters. This SNF has been stored for varying periods of time ranging from 8 to 17 years. The 105-KW Basin is constructed of concrete with an epoxy coating and contains approximately 1.3 million gallons of water with an asphaltic membrane beneath the pool. The IWTS, which has been described in the Radioactive Air Emissions NOC for Fuel Removal for 105-KW Basin (DOE/RL-97-28 and page changes per US Department of Energy, Richland Operations Office letter 97-EAP-814) will be used to remove radionuclides from the basin water during fuel removal operations. The purpose of the modification described herein is to provide operational flexibility for the IWTS at the 105-KW basin. The proposed modification is scheduled to begin in calendar year 1998.

  12. Plutonium Finishing Plant (PFP) Final Safety Analysis Report (FSAR) [SEC 1 THRU 11

    SciTech Connect

    ULLAH, M K

    2001-02-26

    The Plutonium Finishing Plant (PFP) is located on the US Department of Energy (DOE) Hanford Site in south central Washington State. The DOE Richland Operations (DOE-RL) Project Hanford Management Contract (PHMC) is with Fluor Hanford Inc. (FH). Westinghouse Safety Management Systems (WSMS) provides management support to the PFP facility. Since 1991, the mission of the PFP has changed from plutonium material processing to preparation for decontamination and decommissioning (D and D). The PFP is in transition between its previous mission and the proposed D and D mission. The objective of the transition is to place the facility into a stable state for long-term storage of plutonium materials before final disposition of the facility. Accordingly, this update of the Final Safety Analysis Report (FSAR) reflects the current status of the buildings, equipment, and operations during this transition. The primary product of the PFP was plutonium metal in the form of 2.2-kg, cylindrical ingots called buttoms. Plutonium nitrate was one of several chemical compounds containing plutonium that were produced as an intermediate processing product. Plutonium recovery was performed at the Plutonium Reclamation Facility (PRF) and plutonium conversion (from a nitrate form to a metal form) was performed at the Remote Mechanical C (RMC) Line as the primary processes. Plutonium oxide was also produced at the Remote Mechanical A (RMA) Line. Plutonium processed at the PFP contained both weapons-grade and fuels-grade plutonium materials. The capability existed to process both weapons-grade and fuels-grade material through the PRF and only weapons-grade material through the RMC Line although fuels-grade material was processed through the line before 1984. Amounts of these materials exist in storage throughout the facility in various residual forms left from previous years of operations.

  13. 10. Floor Layout of Thermal Hydraulics Laboratory, from The Thermal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Floor Layout of Thermal Hydraulics Laboratory, from The Thermal Hydraulics Laboratory at Hanford. General Electric Company, Hanford Atomic Products Operation, Richland, Washington, 1961. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA

  14. Lake Traverse ROPE (Reservoir Operation Plan Evaluation).

    DTIC Science & Technology

    1987-01-01

    County Ditch No. 42 from 385 second-feet to 400 second-feet. These channel improvements are expected to provide for floods of 10-year frequency with...Insurance Administration report, dated March 1978, for Wilkin County , Minnesota. The report includes flood profiles (500-, 100-, 50-, and 10-year...The discharge-rating curve is included as figure 10. Bois de Sioux River Agricultural Flooding . - Richland and Wilkin County officials and numerous

  15. Applied Operations Research: Operator's Assistant

    NASA Technical Reports Server (NTRS)

    Cole, Stuart K.

    2015-01-01

    NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.

  16. Operating Efficiently

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2010-01-01

    The ailing economy has spared few schools and universities. Faced with funding cutbacks, most education administrators have had to make difficult choices about where to allocate dwindling resources. Even in the best of financial times, educating students is the first priority. When money is tight, school maintenance and operations (M&O)…

  17. Corps Operations

    DTIC Science & Technology

    2010-11-26

    affairs operations O-6 command and control Chemical, biological, radiological , and nuclear officer O-6 protection Chaplain O-6 personal staff...target protection analysis. Coordination with main CP and external organizations. CHEMICAL, BIOLOGICAL, RADIOLOGICAL , AND NUCLEAR ELEMENT 2-162...2-170 chemical, biological, radiological , and nuclear element, tactical command post protection cell, 2-162 chemical, biological, radiological

  18. Operation Shadow.

    ERIC Educational Resources Information Center

    Watson, Marilyn Parrish

    Operation Shadow provides materials for a career education program which gives students ages 11-13 an opportunity to relate school subjects to the world of work. Students spend one month in classroom activities, including study of characteristics of self and others and how these characteristics and interests affect one's choice of a life career.…

  19. Operating Efficiently

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2010-01-01

    The ailing economy has spared few schools and universities. Faced with funding cutbacks, most education administrators have had to make difficult choices about where to allocate dwindling resources. Even in the best of financial times, educating students is the first priority. When money is tight, school maintenance and operations (M&O)…

  20. Operational Resilience

    DTIC Science & Technology

    2014-10-16

    home users targeted distributed attack tools increase in wide-scale Trojan horse distribution Windows-based remote controllable Trojans (Back...Political pressures Outsourcing Business cycles Wars Etc., Etc., Etc… 80 Why do operational risks matter? Trust and confidence of employees

  1. Vadose zone characterization project at the Hanford Tank Farms: U Tank Farm Report

    SciTech Connect

    1997-05-01

    The U.S. Department of Energy Grand Junction Office (DOE-GJO) was tasked by the DOE Richland Operations Office (DOE-RL) to perform a baseline characterization of the gamma-ray-emitting radionuclides that are distributed in the vadose zone sediments beneath and around the single-shell tanks (SSTs) at the Hanford Site. The intent of this characterization is to determine the nature and extent of the contamination, to identify contamination sources when possible, and to develop a baseline of the contamination distribution that will permit future data comparisons. This characterization work also allows an initial assessment of the impacts of the vadose zone contamination as required by the Resource Conservation and Recovery Act (RCRA). This characterization project involves acquiring information regarding vadose zone contamination with borehole geophysical logging methods and documenting that information in a series of reports. This information is presently limited to detection of gamma-emitting radionuclides from both natural and man-made sources. Data from boreholes surrounding each tank are compiled into individual Tank Summary Data Reports. The data from each tank in a tank farm are then compiled and summarized in a Tank Farm Report. This document is the Tank Farm Report for the U Tank Farm. Logging operations used high-purity germanium detection systems to acquire laboratory-quality assays of the gamma-emitting radionuclides in the sediments around and below the tanks. These assays were acquired in 59 boreholes that surround the U Tank Farm tanks. Logging of all boreholes was completed in December 1995, and the last Tank Summary Data Report for the U Tank Farm was issued in September 1996.

  2. Results of Phase I groundwater quality assessment for single-shell tank waste management areas T and TX-TY at the Hanford Site

    SciTech Connect

    Hodges, F.N.

    1998-01-01

    Pacific Northwest National Laboratory (PNNL) conducted a Phase I, Resource Conservation and Recovery Act of 1976 (RCRA) groundwater quality assessment for the Richland Field Office of the U.S. Department of Energy (DOE-RL) under the requirements of the Federal Facility Compliance Agreement. The purpose of the investigation was to determine if the Single-Shell Tank Waste Management Areas (WMAs) T and TX-TY have impacted groundwater quality. Waste Management Areas T and TX-TY, located in the northern part of the 200 West Area of the Hanford Site, contain the 241-T, 241-TX, and 241-TY tank farms and ancillary waste systems. These two units are regulated under RCRA interim-status regulations (under 40 CFR 265.93) and were placed in assessment groundwater monitoring because of elevated specific conductance in downgradient wells. Anomalous concentrations of technetium-99, chromium, nitrate, iodine-129, and cobalt-60 also were observed in some downgradient wells. Phase I assessment, allowed under 40 CFR 265, provides the owner-operator of a facility with the opportunity to show that the observed contamination has a source other than the regulated unit. For this Phase I assessment, PNNL evaluated available information on groundwater chemistry and past waste management practices in the vicinity of WMAs T and TX-TY. Background contaminant concentrations in the vicinity of WMAs T and TX-TY are the result of several overlapping contaminant plumes resulting from past-practice waste disposal operations. This background has been used as baseline for determining potential WMA impacts on groundwater.

  3. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    SciTech Connect

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  4. Establishing operations

    PubMed Central

    Michael, Jack

    1993-01-01

    The first two books on behavior analysis (Skinner, 1938; Keller & Schoenfeld, 1950) had chapter-length coverage of motivation. The next generation of texts also had chapters on the topic, but by the late 1960s it was no longer being given much treatment in the behavior-analytic literature. The present failure to deal with the topic leaves a gap in our understanding of operant functional relations. A partial solution is to reintroduce the concept of the establishing operation, defined as an environmental event, operation, or stimulus condition that affects an organism by momentarily altering (a) the reinforcing effectiveness of other events and (b) the frequency of occurrence of that part of the organism's repertoire relevant to those events as consequences. Discriminative and motivative variables can be distinguished as follows: The former are related to the differential availability of an effective form of reinforcement given a particular type of behavior; the latter are related to the differential reinforcing effectiveness of environmental events. An important distinction can also be made between unconditioned establishing operations (UEOs), such as food deprivation and painful stimulation, and conditioned establishing operations (CEOs) that depend on the learning history of the organism. One type of CEO is a stimulus that has simply been paired with a UEO and as a result may take on some of the motivative properties of that UEO. The warning stimulus in avoidance procedures is another important type of CEO referred to as reflexive because it establishes its own termination as a form of reinforcement and evokes the behavior that has accomplished such termination. Another CEO is closely related to the concept of conditional conditioned reinforcement and is referred to as a transitive CEO, because it establishes some other stimulus as a form of effective reinforcement and evokes the behavior that has produced that other stimulus. The multiple control of human

  5. Surface radiation survey for the Phase 1 remedial investigation of the 300-FF-1 operable unit on the Hanford Site

    SciTech Connect

    Teel, S.S.; Olsen, K.B.

    1990-10-01

    This report summarizes Task 3a-1 of the Phase I Remedial Investigation for the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The purpose of the Remedial Investigation is to determine the nature and extent of the risk presented by releases of hazardous substances from the operable unit. The purpose of Task 3a-1 was to locate any areas of contaminated soil outside of operable unit waste facility boundaries. Surface radiation survey and sampling activities in the 300-FF-1 Operable Unit were conducted from September 1989 to December 1989 and April 1990 to June 1990. Surveys were conducted primarily using portable Geiger-Muller beta/gamma detectors. As a result, 77 locations were found where radiation occurred above a statistically calculated background estimate. The Ultra Sonic Ranging and Data System (USRADS) was also used to survey a limited area. Analysis of the USRADS data revealed several elevated measurements that were not detected at the same locations with the Geiger-Muller detector. 6 refs., 14 figs., 4 tabs.

  6. Stability Operations

    DTIC Science & Technology

    2008-10-06

    the requirement for future military intervention. It postures the military to perform a role common throughout history—ensuring the safety and...time in our history. It institutionalizes the hard-won lessons of the past while charting a path for tomorrow. This manual postures our military forces...protected the goods and trade routes of local merchants , allowing markets to reopen quickly in the aftermath of operations. He instituted local

  7. Operation Poorman

    SciTech Connect

    Pruvost, N.; Tsitouras, J.

    1981-03-18

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

  8. Space Operations

    DTIC Science & Technology

    2013-05-29

    provide ISR, PNT, weather, and communications support to the joint force, enabling precise friendly force tracking (FFT), enhancing joint force...of debris are too small to track with current sensor capabilities. Currently, the US tracks only approximately 10 percent of space objects that are...military operations. 4. Functional Capabilities SSA can be divided into four functional capabilities (Figure II-1): a. Detect/ Track /Identify (D/T/ID

  9. Operations automation

    NASA Technical Reports Server (NTRS)

    Boreham, Charles Thomas

    1994-01-01

    This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

  10. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    SciTech Connect

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  11. Surface Environmental Surveillance Project: Locations Manual Volume 1 – Air and Water Volume 2 – Farm Products, Soil & Vegetation, and Wildlife

    SciTech Connect

    Fritz, Brad G.; Patton, Gregory W.; Stegen, Amanda; Poston, Ted M.

    2009-01-01

    This report describes all environmental monitoring locations associated with the Surface Environmental Surveillance Project. Environmental surveillance of the Hanford site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The environmental surveillance sampling design is described in the Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operation Office (DOE/RL-91-50). This document contains the locations of sites used to collect samples for the Surface Environmental Surveillance Project (SESP). Each section includes directions, maps, and pictures of the locations. A general knowledge of roads and highways on and around the Hanford Site is necessary to successfully use this manual. Supplemental information (Maps, Gazetteer, etc.) may be necessary if user is unfamiliar with local routes. The SESP is a multimedia environmental surveillance effort to measure the concentrations of radionuclides and chemicals in environmental media to demonstrate compliance with applicable environmental quality standards and public exposure limits, and assessing environmental impacts. Project personnel annually collect selected samples of ambient air, surface water, agricultural products, fish, wildlife, and sediments. Soil and vegetation samples are collected approximately every 5 years. Analytical capabilities include the measurement of radionuclides at very low environmental concentrations and, in selected media, nonradiological chemicals including metals, anions, volatile organic compounds, and total organic carbon.

  12. Plan and schedule for disposition and regulatory compliance for all remaining Miscellaneous Streams

    SciTech Connect

    Skurla, S.J.

    1994-01-01

    On December 23, 1991, the US Department of Energy, Richland Operations Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of Department of Ecology Consent Order No. DE 91NM-177 (Consent Order) (Ecology and USDOE, 1991). The Consent Order lists regulatory milestones for liquid effluent streams at the Hanford Site to comply with the permitting requirements of Washington Administrative Code 173-216 or 173-218 where applicable (WAC 173-216/218). Hanford Site liquid effluent stream discharging to the soil column have been categorized in the Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams are identified in two RL reports: ``Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site`` (DOE-RL 1987), and ``Annual Status of the Report of the Plan and Schedule to Discontinue Disposal of Contaminated Liquids into the Soil Column at the Hanford Site`` (Stordeur 1988). Miscellaneous Streams are those liquid effluent streams discharged to the ground that are not categorized as Phase I or Phase II Streams. Miscellaneous Streams discharging to the soil column at the Hanford Site are subject to the requirements of several milestones identified in the Consent Order. This document provides a plan and schedule for the disposition of Miscellaneous Streams to satisfy one of the Miscellaneous Stream Consent Order requirements. The disposition process for the Miscellaneous Streams as developed for this milestone is facilitated using a decision tree format. The logic diagram and corresponding analysis for determining appropriate disposition of these streams is presented in this document.

  13. Operating internationally

    SciTech Connect

    Seeley, R.S.

    1994-02-01

    When Enron Power Corp. took over a 28 MW power facility at the former US Naval base in Subic Bay, the Philippines, the company was required to employ 139 people to run the plant. This large labor force was necessary not because of the plant's operational needs, but because of local labor practices and unemployment pressures. Independent power companies have become all too familiar with the high cost and complexity of developing projects in emerging international markets. Some of the most significant issues involve taxation, unfamiliar legal systems, changing regulations, and foreign investment restrictions. In addition, questions about currency exchange, national credit worthiness, and political stability add to the difficulty of international development. However, one of the most daunting challenges centers not on development, but on long-term operations and maintenance (O M). A key concern is finding qualified labor. Most developers and O M companies agree that local people should run the plant, with the top person, or persons, thoroughly trained in the developer's company philosophy.

  14. 10 CFR 1008.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., Mail Stop K8-50, Richland, WA 99352. (14) Pittsburgh Naval Reactors, P.O. Box 109, West Mifflin, PA 15122-0109. (15) Richland Operations Office, P.O. Box 550, Mail Stop A7-75, Richland, WA 99352. (16...

  15. What Goes around Comes around: Using the Malcolm Baldrige Education Criteria for Performance Excellence

    ERIC Educational Resources Information Center

    Eggleston, Kathryn K.; Gibbons, Mary Frances; Vera, Fonda

    2007-01-01

    This article describes Richland College's Malcolm Baldrige National Quality Award-winning Performance Excellence Model. Richland's leadership team uses systematic strategic and operational approaches to improve performance. These approaches mirror Richland's vision, mission, values, and goals and reflect their approach-deploy-learn-integrate…

  16. Green Richland: Building Sustainable Local and World Community

    ERIC Educational Resources Information Center

    Lester, Carole N.

    2008-01-01

    This article shares the college's experiences and the lessons learned in the creation of the GREENRichland Program and the other approaches to building sustainability. These programs directly support the college's vision to be the best place to learn, teach, and build sustainable local and world community. This discussion features details…

  17. Surface Water Quality Investigation of the Richland Creek, Illinois Basin.

    DTIC Science & Technology

    1980-07-01

    ground water . Depending upon the form of the actual discharge, leachate and surface runoff can be either a point source of pollution or a non-point... source . The polluting characteristics of leachate and runoff are primarily a function of the waste composition, the amount of infiltrating water , and...DISCHARGES*LC - MUNICIPALIT’IES MILES FIGURE 2-3 POINT SOURCE DISCIA R GES-RI CH LAND CREEK BASIN 2-17 A general characterization of affected water

  18. Summer Tutorial Project for Richland-Lexington Economic Opportunity Agency.

    ERIC Educational Resources Information Center

    Bruton, Sally A.

    Reported is a summer tutorial project in Columbia, South Carolina, in which high school and college students tutored elementary school children. Remedial reading and math were emphasized, and arts and crafts and recreational activities were also provided. Field trips were used to reward regular student attendance. The report describes the project…

  19. Green Richland: Building Sustainable Local and World Community

    ERIC Educational Resources Information Center

    Lester, Carole N.

    2008-01-01

    This article shares the college's experiences and the lessons learned in the creation of the GREENRichland Program and the other approaches to building sustainability. These programs directly support the college's vision to be the best place to learn, teach, and build sustainable local and world community. This discussion features details…

  20. Isotope Production at the Hanford Site in Richland, Washington

    SciTech Connect

    Ammoniums

    1999-06-01

    This report was prepared in response to a request from the Nuclear Energy Research Advisory Committee (NERAC) subcommittee on ''Long-Term Isotope Research and Production Plans.'' The NERAC subcommittee has asked for a reply to a number of questions regarding (1) ''How well does the Department of Energy (DOE) infrastructure sme the need for commercial and medical isotopes?'' and (2) ''What should be the long-term role of the federal government in providing commercial and medical isotopes?' Our report addresses the questions raised by the NERAC subcommittee, and especially the 10 issues that were raised under the first of the above questions (see Appendix). These issues are related to the isotope products offered by the DOE Isotope Production Sites, the capabilities and condition of the facilities used to produce these products, the management of the isotope production programs at DOE laboratories, and the customer service record of the DOE Isotope Production sites. An important component of our report is a description of the Fast Flux Test Facility (FFTF) reactor at the Hbford Site and the future plans for its utilization as a source of radioisotopes needed by nuclear medicine physicians, by researchers, and by customers in the commercial sector. In response to the second question raised by the NERAC subcommittee, it is our firm belief that the supply of isotopes provided by DOE for medical, industrial, and research applications must be strengthened in the near future. Many of the radioisotopes currently used for medical diagnosis and therapy of cancer and other diseases are imported from Canada, Europe, and Asia. This situation places the control of isotope availability, quality, and pricing in the hands of non-U.S. suppliers. It is our opinion that the needs of the U.S. customers for isotopes and isotope products are not being adequately served, and that the DOE infrastructure and facilities devoted to the supply of these products must be improved This perception forms one of the fundamental bases for our proposal that the FFTF, which is currently in a standby condition, be reactivated to supply nuclear services and products such as radioisotopes needed by the U.S. medical, industrial, and research communities.

  1. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    SciTech Connect

    COVEY, L.I.

    2000-11-28

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.

  2. Remembering operations.

    PubMed

    Kolers, P A

    1973-09-01

    Two commonplace assumptions about encoding are that sentences are encoded and recognized on the basis of their semantic features primarily and that information regarding form features such as typography is typically ignored or discarded. These assumptions were tested m the present experiment where, within a signal-detection paradigm, S sorted sentences according to whether he had seen them before or not (old vs new) and, if they were old, whether their reappearance was in the same typography as on the first occurrence or a different one. Of the two typographies, one was familiar and the other unfamiliar. Results show that a considerable amount of information regarding surface features is stored for many minutes and that ease of initial encoding is inversely related to likelihood of subsequent recognition: sentences in the unfamiliar typography were remembered better. The results are probably not due to time spent encoding; control tests suggest that time spent encoding a difficult typography does not by itself increase recognition of the semantic content embodied in the typography. Other control tests show that pictorial features or images of the sentences play no significant role in their subsequent recognition. One interpretation of the results is that the analytic activities or cognitive operations that characterize initial acquisition play a significant role in subsequent recognition.

  3. Revegetation Plan for Areas of the Fitzner-Eberhardt Arid Lands Ecology Reserve Affected by Decommissioning of Buildings and Infrastructure and Debris Clean-up Actions

    SciTech Connect

    Downs, Janelle L.; Durham, Robin E.; Larson, Kyle B.

    2011-01-01

    The U.S. Department of Energy (DOE), Richland Operations Office is working to remove a number of facilities on the Fitzner Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument. Decommissioning and removal of buildings and debris on ALE will leave bare soils and excavated areas that need to be revegetated to prevent erosion and weed invasion. Four main areas within ALE are affected by these activities (DOE 2009;DOE/EA-1660F): 1) facilities along the ridgeline of Rattlesnake Mountain, 2) the former Nike missile base and ALE HQ laboratory buildings, 3) the aquatic research laboratory at Rattlesnake Springs area, and 4) a number of small sites across ALE where various types of debris remain from previous uses. This revegetation plan addresses the revegetation and restoration of those land areas disturbed by decommissioning and removal of buildings, facilities and associated infrastructure or debris removal. The primary objective of the revegetation efforts on ALE is to establish native vegetation at each of the sites that will enhance and accelerate the recovery of the native plant community that naturally persists at that location. Revegetation is intended to meet the direction specified by the Environmental Assessment (DOE 2009; DOE/EA-1660F) and by Stipulation C.7 of the Memorandum of Agreement (MOA) for the Rattlesnake Mountain Combined Community Communication Facility and InfrastructureCleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland Washington(DOE 2009; Appendix B). Pacific Northwest National Laboratory (PNNL) under contract with CH2M Hill Plateau Remediation Company (CPRC) and in consultation with the tribes and DOE-RL developed a site-specific strategy for each of the revegetation units identified within this document. The strategy and implementation approach for each revegetation unit identifies an appropriate native species mix and outlines the necessary site preparation activities

  4. Design and operational considerations of United States commercial near-surface low-level radioactive waste disposal facilities

    SciTech Connect

    Birk, S.M.

    1997-10-01

    In accordance with the Low-Level Radioactive Waste Policy Amendments Act of 1985, states are responsible for providing for disposal of commercially generated low-level radioactive waste (LLW) within their borders. LLW in the US is defined as all radioactive waste that is not classified as spent nuclear fuel, high-level radioactive waste, transuranic waste, or by-product material resulting from the extraction of uranium from ore. Commercial waste includes LLW generated by hospitals, universities, industry, pharmaceutical companies, and power utilities. LLW generated by the country`s defense operations is the responsibility of the Federal government and its agency, the Department of Energy. The commercial LLRW disposal sites discussed in this report are located near: Sheffield, Illinois (closed); Maxey Flats, Kentucky (closed); Beatty, Nevada (closed); West Valley, New York (closed); Barnwell, South Carolina (operating); Richland, Washington (operating); Ward Valley, California, (proposed); Sierra Blanca, Texas (proposed); Wake County, North Carolina (proposed); and Boyd County, Nebraska (proposed). While some comparisons between the sites described in this report are appropriate, this must be done with caution. In addition to differences in climate and geology between sites, LLW facilities in the past were not designed and operated to today`s standards. This report summarizes each site`s design and operational considerations for near-surface disposal of low-level radioactive waste. The report includes: a description of waste characteristics; design and operational features; post closure measures and plans; cost and duration of site characterization, construction, and operation; recent related R and D activities for LLW treatment and disposal; and the status of the LLW system in the US.

  5. Orbital operations study. Appendix B: Operational procedures

    NASA Technical Reports Server (NTRS)

    Galvin, D. M.; Mattson, H. L.; True, D. M.; Anderson, N. R.; Mehrbach, E.; Gianformaggio, A.; Steinwachs, W. L.; Turkel, S. H.

    1972-01-01

    Operational procedures for each alternate approach for each interfacing activity of the orbital operations study are presented. The applicability of the procedures to interfacing element pairs is identified.

  6. Operator-valued measures and linear operators

    NASA Astrophysics Data System (ADS)

    Nowak, Marian

    2008-01-01

    We study operator-valued measures , where stands for the space of all continuous linear operators between real Banach spaces X and Y and [Sigma] is a [sigma]-algebra of sets. We extend the Bartle-Dunford-Schwartz theorem and the Orlicz-Pettis theorem for vector measures to the case of operator-valued measures. We generalize the classical Vitali-Hahn-Saks theorem to sets of operator-valued measures which are compact in the strong operator topology.

  7. Amphibious Operations: The Operational Wild Card

    DTIC Science & Technology

    1990-05-14

    8217A234 004 J Amphibious Operations: The Operational Wild Card A Monograph by Major Anthony S. Lieto Armor School of Advanced Military Studies United...NO. TITLE (include Serurity Classificatlion) AMPHIBIOUS OPERATIONS: THE OPERATIONAL WILD CARD (U) PERSONAL AUTHOR(S) Major Anthony S. Licto, USA i...Operations: The Operationa! Wild Card Approved by: ..- ( o./J L. Monograph Director LieutenaA Colorel (USMC) Douglas 0. Hendricks, M.A. // 4/Director

  8. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    SciTech Connect

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  9. Radioactive air emissions notice of construction portable temporary radioactive air emission units - August 1998

    SciTech Connect

    FRITZ, D.W.

    1999-07-22

    This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type I), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type 111). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUs. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site. Radiation Air Emissions Program, Washington Administrative Code (WAC) 246-247, requires that the Washington State Department of Health (WDOH) be notified before construction of any new emission that would release airborne radioactivity. The WDOH also must receive notification before any modification of an existing source. This includes changes in the source term or replacement of emission control equipment that might significantly contribute to the offsite maximum dose from a licensed facility. During site characterization activities, ERAs, sampling and monitoring activities, and other routine activities, the PTRAEUs might require startup immediately. The notification period hampers efforts to complete such activities in an effective and timely manner. Additionally, notification is to be submitted to the WDOH when the PTRAEUs are turned off. The U.S. Department of Energy, Richland Operations Office (DOE-RL) potentially could generate several notifications monthly. The WDOH would be required to review and provide approval on each NOC as well as review the notices of discontinued sources. The WDOH regulation also allows facilities the opportunity to request a

  10. Connecting science and operations: The operations coordinator

    NASA Technical Reports Server (NTRS)

    Marshall, Madeleine H.; Landshof, John A.

    1993-01-01

    For a current space mission under development at the Applied Physics Laboratory, the Mission Operations staff includes a team of 'Operations Coordinators' who have been working with the Mission Science and Spacecraft Development teams since completion of mission conceptual design. The Operations Coordinators are responsible for bringing knowledge of the spacecraft to the Mission Science team and bringing knowledge of the experiment requirements to the Spacecraft Development and Mission Operations teams. Once on-orbit operations begin, the Operations Coordinators will be responsible for implementation of specific science experiments from analysis through scheduling, generation of spacecraft command sequences, delivery of science data to the end user, and operations assessment. The Operations Coordinator concept is proving very effective during the development phase of the current mission.

  11. Operation Transitions, A Framework for Operation Closure

    DTIC Science & Technology

    2010-04-02

    environment. The lack of resources outside of the DOD has led the government to identify alternative funding practices such as the Commander’s...Operation transitions are an essential framework for addressing tactical tasks with strategic resources in support of national end states. Operation... resource requirements early to sustain tactical service units and supporting United States Government (USG) Agencies along operation transitions from

  12. Space station operations management

    NASA Technical Reports Server (NTRS)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  13. STS upper stage operations

    NASA Technical Reports Server (NTRS)

    Kitchens, M. D.; Schnyer, A. D.

    1977-01-01

    Several design/development and operational approaches for STS upper stages are being pursued to realize maximum operational and economic benefits upon the introduction of the STS in the 1980s. The paper focuses special attention on safety operations, launch site operations and on-orbit operations.

  14. STS upper stage operations

    NASA Technical Reports Server (NTRS)

    Kitchens, M. D.; Schnyer, A. D.

    1977-01-01

    Several design/development and operational approaches for STS upper stages are being pursued to realize maximum operational and economic benefits upon the introduction of the STS in the 1980s. The paper focuses special attention on safety operations, launch site operations and on-orbit operations.

  15. Distinguishing quantum operations: LOCC versus separable operators

    NASA Astrophysics Data System (ADS)

    Chattopadhyay, Indrani; Sarkar, Debasis

    2016-08-01

    In this paper, we discuss the issue of distinguishing a pair of quantum operation in general. We use Krause theorem for representing the operations in unitary form. This supports the existence of pair of quantum operations that are not locally distinguishable, but distinguishable in asymptotic sense in some higher dimensional system. The process can even be successful without any use of the entangled initial state.

  16. Operator pencil passing through a given operator

    NASA Astrophysics Data System (ADS)

    Biggs, A.; Khudaverdian, H. M.

    2013-12-01

    Let Δ be a linear differential operator acting on the space of densities of a given weight λ0 on a manifold M. One can consider a pencil of operators {widehat{Pi }}(Δ )=lbrace Δ _{λ }rbrace passing through the operator Δ such that any Δλ is a linear differential operator acting on densities of weight λ. This pencil can be identified with a linear differential operator widehat{Δ } acting on the algebra of densities of all weights. The existence of an invariant scalar product in the algebra of densities implies a natural decomposition of operators, i.e., pencils of self-adjoint and anti-self-adjoint operators. We study lifting maps that are on one hand equivariant with respect to divergenceless vector fields, and, on the other hand, with values in self-adjoint or anti-self-adjoint operators. In particular, we analyze the relation between these two concepts, and apply it to the study of diff (M)-equivariant liftings. Finally, we briefly consider the case of liftings equivariant with respect to the algebra of projective transformations and describe all regular self-adjoint and anti-self-adjoint liftings. Our constructions can be considered as a generalisation of equivariant quantisation.

  17. Operator pencil passing through a given operator

    SciTech Connect

    Biggs, A. E-mail: adam.biggs@student.manchester.ac.uk; Khudaverdian, H. M. E-mail: adam.biggs@student.manchester.ac.uk

    2013-12-15

    Let Δ be a linear differential operator acting on the space of densities of a given weight λ{sub 0} on a manifold M. One can consider a pencil of operators Π-circumflex(Δ)=(Δ{sub λ}) passing through the operator Δ such that any Δ{sub λ} is a linear differential operator acting on densities of weight λ. This pencil can be identified with a linear differential operator Δ-circumflex acting on the algebra of densities of all weights. The existence of an invariant scalar product in the algebra of densities implies a natural decomposition of operators, i.e., pencils of self-adjoint and anti-self-adjoint operators. We study lifting maps that are on one hand equivariant with respect to divergenceless vector fields, and, on the other hand, with values in self-adjoint or anti-self-adjoint operators. In particular, we analyze the relation between these two concepts, and apply it to the study of diff (M)-equivariant liftings. Finally, we briefly consider the case of liftings equivariant with respect to the algebra of projective transformations and describe all regular self-adjoint and anti-self-adjoint liftings. Our constructions can be considered as a generalisation of equivariant quantisation.

  18. 10 CFR 710.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the individual with primary responsibility for safeguards and security at the Chicago, Idaho, Oak... Operations Office (Albuquerque, Chicago, Idaho, Nevada, Oak Ridge, Oakland, Richland, or Savannah River), the...

  19. 10 CFR 710.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the individual with primary responsibility for safeguards and security at the Chicago, Idaho, Oak... Operations Office (Albuquerque, Chicago, Idaho, Nevada, Oak Ridge, Oakland, Richland, or Savannah River), the...

  20. 10 CFR 710.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the individual with primary responsibility for safeguards and security at the Chicago, Idaho, Oak... Operations Office (Albuquerque, Chicago, Idaho, Nevada, Oak Ridge, Oakland, Richland, or Savannah River), the...

  1. 10 CFR 710.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the individual with primary responsibility for safeguards and security at the Chicago, Idaho, Oak... Operations Office (Albuquerque, Chicago, Idaho, Nevada, Oak Ridge, Oakland, Richland, or Savannah River), the...

  2. Ares I Operability Overview

    NASA Technical Reports Server (NTRS)

    Shaughnessy, Raymond W.

    2009-01-01

    A general overview of Ares I Operability is presented. The contents include: 1) Vehicle and Ops Concept Overviews; 2) What does operability mean to the Ares I Project?; 3) What is the Ares Project doing to influence operability into the flight hardware designs?; and 4) How do we measure Ares I Project success in infusing operability?

  3. Biomedical programs operations plans

    NASA Technical Reports Server (NTRS)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  4. Tank waste remediation system operation and utilization plan,vol. I {ampersand} II

    SciTech Connect

    Kirkbride, R.A.

    1997-09-01

    The U.S. Department of Energy Richland Operations Office (RL) is in the first stages of contracting with private companies for the treatment and immobilization of tank wastes. The components of tank waste retrieval, treatment, and immobilization have been conceived in two phases (Figure 1.0-1). To meet RL's anticipated contractual requirements, the Project Hanford Management Contractor (PHMC) companies will be required to provide waste feeds to the private companies consistent with waste envelopes that define the feeds in terms of quantity, and concentration of both chemicals and radionuclides. The planning that supports delivery of the feed must be well thought out in four basic areas: (1) Low-activity waste (LAW)/high-level waste (HLW) feed staging plans. How is waste moved within the existing tanks to deliver waste that corresponds to the defined feed envelopes to support the Private Contractor's processing schedule and processing rate? (2) Single-shell tank (SST) retrieval sequence. How are Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1994) milestones for SST retrieval integrated into the Phase I processing to set the stage for Phase II processing to complete the mission? (3) Tank Waste Remediation System (TWRS) process flowsheet. How do materials flow from existing tank inventories through: (1) blending and pretreatment functions in the double-shell tanks (DSTs), (2) contractor processing facilities, and (3) stored waste forms (Figure 1.0-2); (4) Storage and disposal of the immobilized low-activity waste (ILAW) and immobilized high-level waste (IHLW) product. How is the ILAW and IHLW product received from the private companies, the ILAW disposed onsite, and the IHLW stored onsite until final disposal?

  5. Operations Nomenclature [Annexes

    NASA Technical Reports Server (NTRS)

    Shannon, Yvette Y.

    2011-01-01

    The purpose of Operations Nomenclature (OpNom) is to document methods for denoting all hardware and software and associated data referenced by operations products produced by the International Space Station (ISS) operations community. This includes Operations Data File (ODF) procedures, ground and onboard displays, mission rules, commands, messages and advisories, planning products, etc. This document applies to all agencies and individuals participating in or contributing to ISS mission operations. Mission operations include ground checkout, training, and simulations, as well as real-time activities. The document also applies to all operations documentation (paper or electronic media) and other products that refer to ISS-related equipment or activities.

  6. Operation MARKET-GARDEN

    DTIC Science & Technology

    1984-03-01

    RECIPIENT’S CATALOG NUMBER 4. TITLE (and Subtitle) S. TYPE OF RC’PORT & 1ERIOO COVERED 6. PERFORMING 01G. REPORT NUMBER OPERATION MARKET -GARDEN...Continue on reverse aide if n.ceUFmy and Identify by block number) .,7-Presents an summary of Operation MARKET -GARDEN. Ue xmlsfo this operation to...will prove very he’lpful to analyze previous operations which have involved airborne forces. This paper will discuss)Operation MARKET -GARDEN, which

  7. Hanford high level waste: Sample Exchange/Evaluation (SEE) Program

    SciTech Connect

    King, A.G.

    1994-08-01

    The Pacific Northwest Laboratory (PNL)/Analytical Chemistry Laboratory (ACL) and the Westinghouse Hanford Company (WHC)/Process Analytical Laboratory (PAL) provide analytical support services to various environmental restoration and waste management projects/programs at Hanford. In response to a US Department of Energy -- Richland Field Office (DOE-RL) audit, which questioned the comparability of analytical methods employed at each laboratory, the Sample Exchange/Exchange (SEE) program was initiated. The SEE Program is a selfassessment program designed to compare analytical methods of the PAL and ACL laboratories using sitespecific waste material. The SEE program is managed by a collaborative, the Quality Assurance Triad (Triad). Triad membership is made up of representatives from the WHC/PAL, PNL/ACL, and WHC Hanford Analytical Services Management (HASM) organizations. The Triad works together to design/evaluate/implement each phase of the SEE Program.

  8. Elementary operators on self-adjoint operators

    NASA Astrophysics Data System (ADS)

    Molnar, Lajos; Semrl, Peter

    2007-03-01

    Let H be a Hilbert space and let and be standard *-operator algebras on H. Denote by and the set of all self-adjoint operators in and , respectively. Assume that and are surjective maps such that M(AM*(B)A)=M(A)BM(A) and M*(BM(A)B)=M*(B)AM*(B) for every pair , . Then there exist an invertible bounded linear or conjugate-linear operator and a constant c[set membership, variant]{-1,1} such that M(A)=cTAT*, , and M*(B)=cT*BT, .

  9. Your Lung Operation: After Your Operation

    MedlinePlus Videos and Cool Tools

    ... Education Trauma Education Achieving Zero Preventable Deaths Trauma Systems Conference Advanced Surgical Skills for Exposure in Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills for Trauma Disaster Management and ...

  10. Automated operations planning: Modeling MLRS operations

    SciTech Connect

    Cunningham, C.T.

    1992-03-05

    The multiples launch rocket system (MLRS) is a highly survivable and automated complement to conventional cannon artillery. For best survivability against counter-battery fire, MLRS operations rely on rapid shoot-and-scoot'' tactics by widely dispersed launchers. Such tactics may be difficult to include in a battlefield simulation without requiring players for the individual MLRS items: launchers and resupply vehicles. To reduce this demand on player resources, a computer model has been developed to automate the behavior of the items, consistent with the published operations doctrine. A player is required to determine the area of operation and certain key locations for an MLRS firing platoon. Analysis of trafficability in the operations area and direction the movement of the items, as the perform fire missions, resupply, and replenishment of platoon stocks, is completely automated. A finite state machine representation of the items is used. The model is currently implemented on a VAX 6310. It will be integrated with the Janus battlefield trainer.

  11. Automated operations planning: Modeling MLRS operations

    SciTech Connect

    Cunningham, C.T.

    1992-03-05

    The multiples launch rocket system (MLRS) is a highly survivable and automated complement to conventional cannon artillery. For best survivability against counter-battery fire, MLRS operations rely on rapid ``shoot-and-scoot`` tactics by widely dispersed launchers. Such tactics may be difficult to include in a battlefield simulation without requiring players for the individual MLRS items: launchers and resupply vehicles. To reduce this demand on player resources, a computer model has been developed to automate the behavior of the items, consistent with the published operations doctrine. A player is required to determine the area of operation and certain key locations for an MLRS firing platoon. Analysis of trafficability in the operations area and direction the movement of the items, as the perform fire missions, resupply, and replenishment of platoon stocks, is completely automated. A finite state machine representation of the items is used. The model is currently implemented on a VAX 6310. It will be integrated with the Janus battlefield trainer.

  12. Plant operation report and daily operation summary

    SciTech Connect

    Not Available

    1985-01-01

    The operational, maintenance and evaluation activities and highlights that were required during the month of February 1985 are summarized for the Central Receiver System and the Distributed Collector System. (BCS)

  13. Computer algebra and operators

    NASA Technical Reports Server (NTRS)

    Fateman, Richard; Grossman, Robert

    1989-01-01

    The symbolic computation of operator expansions is discussed. Some of the capabilities that prove useful when performing computer algebra computations involving operators are considered. These capabilities may be broadly divided into three areas: the algebraic manipulation of expressions from the algebra generated by operators; the algebraic manipulation of the actions of the operators upon other mathematical objects; and the development of appropriate normal forms and simplification algorithms for operators and their actions. Brief descriptions are given of the computer algebra computations that arise when working with various operators and their actions.

  14. Space Station operations

    NASA Technical Reports Server (NTRS)

    Gray, R. H.

    1985-01-01

    An evaluation of the success of the Space Station will be based on the service provided to the customers by the Station crew, the productivity of the crew, and the costs of operation. Attention is given to details regarding Space Station operations, a summary of operational philosophies and requirements, logistics and resupply operations, prelaunch processing and launch operations, on-orbit operations, aspects of maintainability and maintenance, habitability, and questions of medical care. A logistics module concept is considered along with a logistics module processing timeline, a habitability module concept, and a Space Station rescue mission.

  15. Improving operating room safety

    PubMed Central

    2009-01-01

    Despite the introduction of the Universal Protocol, patient safety in surgery remains a daily challenge in the operating room. This present study describes one community health system's efforts to improve operating room safety through human factors training and ultimately the development of a surgical checklist. Using a combination of formal training, local studies documenting operating room safety issues and peer to peer mentoring we were able to substantially change the culture of our operating room. Our efforts have prepared us for successfully implementing a standardized checklist to improve operating room safety throughout our entire system. Based on these findings we recommend a multimodal approach to improving operating room safety. PMID:19930577

  16. Plant operation report and daily operation summary

    SciTech Connect

    Not Available

    1985-03-01

    The operational, maintenance and evaluation activities and highlights that were required during the month of March 1985 for the Central Receiver System (CRS) and the Distributed Collector System (DCS) are summarized. Both the CRS and the DCS suffered serious reductions in their operational ability; the CRS due to a pending trace heating repair. The DCS was out of service due to a failure in the Power Conversion System feedwater pump. (BCS)

  17. Training and Tactical Operationally Responsive Space Operations

    NASA Astrophysics Data System (ADS)

    Sorensen, B.; Strunce, R., Jr.

    Current space assets managed by traditional space system control resources provide communication, navigation, intelligence, surveillance, and reconnaissance (ISR) capabilities using satellites that are designed for long life and high reliability. The next generation Operationally Responsive Space (ORS) systems are aimed at providing operational space capabilities which will provide flexibility and responsiveness to the tactical battlefield commander. These capabilities do not exist today. The ORS communication, navigation, and ISR satellites are being designed to replace or supplement existing systems in order to enhance the current space force. These systems are expected to rapidly meet near term space needs of the tactical forces. The ORS concept includes new tactical satellites specifically designed to support contingency operations such as increased communication bandwidth and ISR imagery over the theater for a limited period to support air, ground, and naval force mission. The Concept of Operations (CONOPS) that exists today specifies that in addition to operational control of the satellite, the tasking and scheduling of the ORS tactical satellite for mission data collection in support of the tactical warfighter will be accomplished within the Virtual Mission Operations Center (VMOC). This is very similar to what is currently being accomplished in a fixed Mission Operations Center on existing traditional ISR satellites. The VMOC is merely a distributed environment and the CONOPS remain virtually the same. As a result, there is a significant drawback to the current ORS CONOPS that does not account for the full potential of the ORS paradigm for supporting tactical forces. Although the CONOPS approach may be appropriate for experimental Tactical Satellites (TacSat), it ignores the issues associated with the In-Theater Commander's need to own and operate his dedicated TacSat for most effective warfighting as well as the Warfighter specific CONOPS. What is needed

  18. TECHNICAL BASIS FOR EVALUATING SURFACE BARRIERS TO PROTECT GROUNDWATER FROM DEEP VADOSE ZONE CONTAMINATION

    SciTech Connect

    FAYER JM; FREEDMAN VL; WARD AL; CHRONISTER GB

    2010-02-24

    The U.S. DOE and its predecessors released nearly 2 trillion liters (450 billion gallons) of contaminated liquid into the vadose zone at the Hanford Site. Some of the contaminants currently reside in the deeper parts of the vadose zone where they are much less accessible to characterization, monitoring, and typical remediation activities. The DOE Richland Operations Office (DOE-RL) prepared a treatability test plan in 2008 to examine remediation options for addressing contaminants in the deep vadose zone; one of the technologies identified was surface barriers (also known as engineered barriers, covers, and caps). In the typical configuration, the contaminants are located relatively close to the surface, generally within 15 m, and thus they are close to the base of the surface barrier. The proximity of the surface barrier under these conditions yielded few concerns about the effectiveness of the barrier at depth, particularly for cases in which the contaminants were in a lined facility. At Hanford, however, some unlined sites have contaminants located well below depths of 15 m. The issue raised about these sites is the degree of effectiveness of a surface barrier in isolating contaminants in the deep vadose zone. Previous studies by Hanford Site and PNNL researchers suggest that surface barriers have the potential to provide a significant degree of isolation of deep vadose zone contaminants. The studies show that the actual degree of isolation is site-specific and depends on many factors, including recharge rates, barrier size, depth of contaminants, geohydrologic properties ofthe sediments, and the geochemical interactions between the contaminants and the sediments. After the DOE-RL treatability test plan was published, Pacific Northwest National Laboratory was contracted to review the information available to support surface barrier evaluation for the deep vadose zone, identify gaps in the information and outcomes necessary to fill the data gaps, and outline

  19. Crew Transportation Operations Standards

    NASA Technical Reports Server (NTRS)

    Mango, Edward J.; Pearson, Don J. (Compiler)

    2013-01-01

    The Crew Transportation Operations Standards contains descriptions of ground and flight operations processes and specifications and the criteria which will be used to evaluate the acceptability of Commercial Providers' proposed processes and specifications.

  20. Major operations and activities

    SciTech Connect

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development.

  1. Navy Operational Planner

    DTIC Science & Technology

    2015-03-01

    intelligence JFMCC Joint Force Maritime Component Commander JP joint publication KTS knots LOE level of effort MCM mine countermeasures MIO ...Operations ( MIO ) Maritime interception operations involve efforts to monitor, query, and board merchant vessels in international waters to enforce

  2. LTFT Operating Parameters

    SciTech Connect

    Brown, Donald W.; Albright, James N.

    1989-04-18

    In order to finalize planning, the following specifications are recommended for the operation of the LTFT. Although operation of the reservoir under the specified conditions provides for a comprehensive evaluation of the Phase II reservoir.

  3. Gaps of operators

    NASA Astrophysics Data System (ADS)

    Jung, Il Bong; Lim, Pil Sang; Park, Sang Soo

    2005-04-01

    We construct examples which distinguish clearly the classes of p-hyponormal operators for 0operators on the complex Hilbert space. Only a few examples of p-hyponormal operators have been examined. Our technique can provide many examples related to the above operators.

  4. Tactical and Operational Depth,

    DTIC Science & Technology

    1986-05-14

    7 Operation Bustard Hunt ... ...... 12 Battle of Kursk . . . . . . . . . . 1- Comparative Analysis of Battles . . . I np I icat ions...27 3. Operation Bustard Hunt Map ........ 28 4. Battle of Kursk Map ...... .......... 29 Endnotes ........ ................ 3 Bibliography...variables. Just by virtue of being in contact the defender’s ability to raneuver is restricted. At Gazala and in Operation Bustard Hurt the tactical defense

  5. Payroll/Operations Analysis.

    ERIC Educational Resources Information Center

    San Diego Community Coll. District, CA. Research Office.

    Based on the findings of an operations research project undertaken by the San Diego Community College District (SDCCD), this report presents recommendations for improving the organizational structure of SDCCD's payroll/operations department. The report first outlines 15 organizational and operations problems confronting the department as revealed…

  6. Operations and maintenance philosophy

    SciTech Connect

    DUNCAN, G.P.

    1999-10-28

    This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

  7. International utilization and operations

    NASA Technical Reports Server (NTRS)

    Goldberg, Stanley R.

    1989-01-01

    The international framework of the Space Station Freedom Program is described. The discussion covers the U.S. space policy, international agreements, international Station elements, overall program management structure, and utilization and operations management. Consideration is also given to Freedom's user community, Freedom's crew, pressurized payload and attached payload accommodations, utilization and operations planning, user integration, and user operations.

  8. Lageos assembly operation plan

    NASA Technical Reports Server (NTRS)

    Brueger, J.

    1975-01-01

    Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.

  9. LEGRI Science Operation Center. Architecture and Operations

    NASA Astrophysics Data System (ADS)

    Blay, Pere; Suso, Julia; Robert, Almudena; Luis Requena, Jose; Alamo, Jorge; Reglero, Victor; Eyles, Chris J.

    2001-03-01

    The LEGRI Science Operation Center (SOC) is the single contact point between the MINISAT-01 Centro de Operaciones Científicas (COC) located at Villafranca del Castillo (Madrid) and the LEGRI Consortium. Its architecture, operational procedures and associated software has been developed at the Universities of Valencia and Birmingham on the scope to define a integrated Data Analysis System, able to perform the daily follow-up of the instrument health, raw data files decompression and archiving activities (on-line and historical). Pointing and telecommand files generation is also a SOC responsibility. The aim of this paper is to report the SOC activities during the two years of LEGRI operations. Conclusions about the SOC architecture and procedures evolution on how to handle the operations for space-borne instrumentation, are also presented. Special attention has been paid to the operative evaluation of the pointing reconstruction solutions from the MINISAT-01 Attitude Control System by comparing them with those obtained with the LEGRI Star Sensor. The analysis of one year of observations shows the good agreement between both sets of data. No systematic deviations have been found with an averaged standard deviation of 1 degree in alpha and delta coordinates. For most of the time the MINISAT pointing system is working slightly better than expected and within specifications.

  10. Payload operation television system

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The Payload Operation Television System is a high performance closed-circuit TV system designed to determine the feasibility of using TV to augment purely visual monitoring of operations, and to establish optimum system design of an operating unit which can ultimately be used to assist the operator of a remotely manipulated space-borne cargo loading device. The TV system assembled on this program is intended for laboratory experimentation which would develop operational techniques and lead to the design of space-borne TV equipment whose purpose would be to assist the astronaut-operator aboard a space station to load payload components. The equipment consists principally of a good quality TV camera capable of high resolving power; a TV monitor; a sync generator for driving camera and monitor; and two pan/tilt units which are remotely controlled by the operator.

  11. Operator Lipschitz functions

    NASA Astrophysics Data System (ADS)

    Aleksandrov, A. B.; Peller, V. V.

    2016-08-01

    The goal of this survey is a comprehensive study of operator Lipschitz functions. A continuous function f on the real line {R} is said to be operator Lipschitz if \\Vert f(A)-f(B)\\Vert≤slant{const}\\Vert A-B\\Vert for arbitrary self-adjoint operators A and B. Sufficient conditions and necessary conditions are given for operator Lipschitzness. The class of operator differentiable functions on {R} is also studied. Further, operator Lipschitz functions on closed subsets of the plane are considered, and the class of commutator Lipschitz functions on such subsets is introduced. An important role for the study of such classes of functions is played by double operator integrals and Schur multipliers. Bibliography: 77 titles.

  12. Operation WATCHTOWER: An Analysis in Operational Design

    DTIC Science & Technology

    1994-02-08

    August £942 until 9 February 1943, Operation WATCHTWMER ws plarmed and executed during the infant stages of U.S. involvement In the ur in the South...Institute, 1990), p. 567. 6. Frank 0. Hough, et al., HistoXr of U.S. arine Coros Operatios in World War I1: Vol. I, Pearl Hhrbor to udalcanal (Washington

  13. Hermeneutic operative calculus

    NASA Astrophysics Data System (ADS)

    Ramakrishnan, Sivakumar; Isawasan, Pradeep; Mohanan, Vasuky

    2014-07-01

    The predicate calculus used currently by mathematical logic in computer science, philosophy and linguistic was found to be too restrictive and inadequate for describing the grammar of natural and artificial language. Therefore many higher order logics have been developed to overcome the limitation of predicate calculus. In this paper a new representation of logic using mathematical principles has been developed for the natural language called Hermeneutic Operative Calculus. This Hermeneutic Operative Calculus is a new language interpretive calculus developed to account for the syntactic, semantic and pragmatic features of natural language and allows removing the restrictions of any particular natural language in the semantic field its map out. The logic of Hermeneutic Operative Calculus capable of represent the syntactic and semantic of factual information of a natural language precisely in any language. The logic of this Hermeneutic Operative Calculus has two different forms of operations called object and meta-operations. The object operation allow for listing the various objects, picturing the various propositions and so forth. The meta-operation would specify what cannot be specified by the object operation like semantical stances of a proposition. The basic operative processes of linguistics and cognitive logic will be mathematically conceptualized and elaborated in this paper.

  14. FY 1997 Hanford telecommunication and informations system user profile, milestone IRM-097-003

    SciTech Connect

    Witherspoon, T.T.

    1997-09-22

    This document reports survey data collected from the U.S. Department of Energy, Richland Operations Office (DOE-RL), Project Hanford Management Contract (PHMC) companies, and the PHMC enterprise companies for purposes of characterizing the Hanford Local Area Network (HLAN) user profile. Telephone, radio, and pager data are also provided. The data reveal that job tasks of the 8,500 Hanford Site workers who use the HLAN are highly, if not completely, computer dependent. Employees use their computers as their pens and paper, calculators, drafting tables and communication devices. Fifty eight percent of the survey respondents predict 90 to 100% loss in productivity if they had no access to a computer. Additionally, 30% of the users felt they would have a 50 to 80% loss in productivity without computers; and more than 68 % use their computers between 4 and 8 hours per day. The profile also shows th at the software packages used most heavily are cc:Mail` the Windows version, Hanford Information, WordPerfece, Site Forms and Look-up. Use of Windows-based products is very high. Regarding the productivity tools that are seldom used, 49 % of the respondents say they ``never use`` the Hanford Help and Hints (HUH). The use of the external intemet by Hanford has shown a large increase. The survey indicates that users rate the intranet and the ability to access other sources of information as the fourth most important computer application. The Microsoft System Management Server (SMS 4) data show that more than 60% of the computers on the HLAN need replacement or upgrades to run the Windows 95 Operating System, which has been selected as the PHMC standard. Although data also show that 77% of the PHMC machines are running the current standard Windows for Workgroup version 3. 1 1, they do not have the memory and/or the hard disk space to upgrade to Windows 95. The survey results indicate that telephone system use is also high and regarded as a useful tool. Pager use is very high and

  15. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect

    Rathbone, Bruce A.

    2011-04-04

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision

  16. Hanford External Dosimetry Technical Basis Manual PNL-MA-842

    SciTech Connect

    Rathbone, Bruce A.

    2010-04-01

    The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at the U.S. Department of Energy (DOE) Hanford site. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with requirements of 10 CFR 835, the DOE Laboratory Accreditation Program, the DOE Richland Operations Office, DOE Office of River Protection, DOE Pacific Northwest Office of Science, and Hanford’s DOE contractors. The dosimetry system is operated by the Pacific Northwest National Laboratory (PNNL) Hanford External Dosimetry Program which provides dosimetry services to PNNL and all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision

  17. Operations management system

    NASA Technical Reports Server (NTRS)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  18. Reparametrization invariant collinear operators

    SciTech Connect

    Marcantonini, Claudio; Stewart, Iain W.

    2009-03-15

    In constructing collinear operators, which describe the production of energetic jets or energetic hadrons, important constraints are provided by reparametrization invariance (RPI). RPI encodes Lorentz invariance in a power expansion about a collinear direction, and connects the Wilson coefficients of operators at different orders in this expansion to all orders in {alpha}{sub s}. We construct reparametrization invariant collinear objects. The expansion of operators built from these objects provides an efficient way of deriving RPI relations and finding a minimal basis of operators, particularly when one has an observable with multiple collinear directions and/or soft particles. Complete basis of operators is constructed for pure glue currents at twist-4, and for operators with multiple collinear directions, including those appearing in e{sup +}e{sup -}{yields}3 jets, and for pp{yields}2 jets initiated via gluon fusion.

  19. Cask fleet operations study

    SciTech Connect

    Not Available

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  20. Network operating system

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.

  1. Redefining Information Operations

    DTIC Science & Technology

    2013-01-01

    ndupress .ndu.edu issue 69, 2 nd quarter 2013 / JFQ 109 W hether it is strategic com -munication, information operations, or cyberspace operations...Force continues to increase the number of behavioral influence analysts, integrating them into joint com - mands.3 In August 2012, the Joint Forces...previously known as psychological operations, electronic warfare, and military deception. This change should benefit the force. First, it allows the com

  2. Integrated mission management operations

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Operations required to launch a modular space station and to provides sustaining ground operations for support of that orbiting station throughout its 10 year mission are studied. A baseline, incrementally manned program and attendent experiment program options are derived. In addition, features of the program that significantly effect initial development and early operating costs are identified, and their impact on the program is assessed. A preliminary design of the approved modular space station configuration is formulated.

  3. 47 CFR 80.1009 - Principal operator and operating position.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Principal operator and operating position. 80...-Bridge Act § 80.1009 Principal operator and operating position. The principal operating position of the... principal operating position, the principal operating position must be able to take full control of the...

  4. 47 CFR 80.1009 - Principal operator and operating position.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Principal operator and operating position. 80...-Bridge Act § 80.1009 Principal operator and operating position. The principal operating position of the... principal operating position, the principal operating position must be able to take full control of the...

  5. Operator interface for vehicles

    SciTech Connect

    Bissontz, Jay E

    2015-03-10

    A control interface for drivetrain braking provided by a regenerative brake and a non-regenerative brake is implemented using a combination of switches and graphic interface elements. The control interface comprises a control system for allocating drivetrain braking effort between the regenerative brake and the non-regenerative brake, a first operator actuated control for enabling operation of the drivetrain braking, and a second operator actuated control for selecting a target braking effort for drivetrain braking. A graphic display displays to an operator the selected target braking effort and can be used to further display actual braking effort achieved by drivetrain braking.

  6. Maintain Stability Operations Capability During Military Operations

    DTIC Science & Technology

    2013-03-01

    foolishness, we had everything before us, we had nothing before us…1 —Charles Dickens 21st Century Challenges Borrowing the opening...sentence from 19th Century British Author Charles Dickens ’, A Tale of Two Cities, seems appropriate as a framework for the United States of America’s...the world, and enjoy, as Dickens would say, “the best of times”, and why should the U.S. Joint force be concerned with integrated operations with our

  7. Operational Command and Control for Information Operations

    DTIC Science & Technology

    2006-05-17

    through the creation of the non- doctrinal TIOC / JFIOCC. 4 SCOPE AND RESPONSIBILTY The recently published Joint Publication 3-13, Joint Doctrine...operations (CMO), and defense support to public diplomacy.8 One area directly linked to related capabilities is strategic communication. Strategic...Secretary of Defense ( Public Affairs) Speech; Council on Foreign Relations as prepared for delivery by SECDEF Donald H. Rumsfeld, Harold Pratt House

  8. Cyberspace Operations in Support of Counterinsurgency Operations

    DTIC Science & Technology

    2013-04-10

    probability it is being used for strategic communication, information operations (io), advertisement for recruits, so- licitation of funding and ongoing...reliability. implementation plans and advertising exist for 3G- and General Packet Radio Service-based networks, which will mark a significant jump in...substantial role in contributing to the coordination efforts of protestors. Websites such as facebook and twitter, various blogs and the use of text messages

  9. Future Operating Concept - Joint Computer Network Operations

    DTIC Science & Technology

    2010-02-17

    of explosive vests in a central market, a beheading captured in streaming video, precise cyber/space/ missile strikes, or Know the enemy and know...cross-theater campaigns. 18 USSTRATCOM integrates space, global strike, ISR, network warfare, and missile defense into functional commands 63...These operations are ―highly dynamic and maneuverable with transitions between F2T2EA phases nearly instantaneously.‖ Integrating effects based

  10. Operation RANGER. Volume 5. Program Reports - Operational

    DTIC Science & Technology

    1952-07-01

    making provision for radiological safety of the surrounding population, livestock, crops, and water supply; and (3| the acquisition of factual data ...New York 1, N. Y. Attn: Material Lab. (961) 95 Commanding Officer, U. S. Naval Radiological Defense Laboratory, San Francisco 24, Calif. 96 Chief...Ionizing Radiation Measurements By W. T. Ham, Jr. 11. Radiological Safety: Informal Report By Richard D. Wolfe 12. Operation "Hot Rod." By

  11. Operation: Save Aunt Sally

    ERIC Educational Resources Information Center

    Zorin, Barbara; Carver, David, Jr.

    2015-01-01

    In grade 6, students should be able to "perform arithmetic operations, including those involving whole-number exponents, in the conventional order when there are no parentheses to specify a particular order" (p. 44). In grades 7 and 8, the rules of order of operations are used to simplify progressively complicated expressions and in…

  12. Crane and Excavator Operator.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    Developed as part of the Marine Corps Institute (MCI) correspondence training program, this course on crane and excavator operation is designed to enable the crane and excavator operator to perform his/her duties more proficiently. Introductory materials include specific information for MCI students, a course introduction, and a study guide…

  13. Operational Law Handbook 2002

    DTIC Science & Technology

    2007-11-02

    focused collection of diverse legal and practical information. 15. SUBJECT TERMS Operational Law 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT...coalition planners, however, Iraqi civilians used the shelter as nighttime sleeping quarters. The complex was bombed, resulting in 300 civilian...These protections continue through all stages of captivity, including interrogation. Detainees. Particularly in Military Operations Other Than War

  14. Automated radio astronomy operations

    NASA Technical Reports Server (NTRS)

    Livermore, R. W.

    1978-01-01

    The improvements in using a computer to drive a DSN 64-meter antenna are described. The development is used to simplify operation, improve antenna safety, reduce antenna wear, present the abuse of antenna by misoperation, increase quantity and quality of data gathered, and give users a greater choice of automatic operations.

  15. Waterworks Operator Training Manual.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    Sixteen self-study waterworks operators training modules are provided. Module titles are the following: basic mathematics, basic chemistry, analysis procedures, microbiology, basic electricity, hydraulics, chlorination, plant operation, surface water, ground water, pumps, cross connections, distribution systems, safety, public relations, and…

  16. CH-54 Operational Statistics

    DTIC Science & Technology

    1976-02-01

    credibility, and sufficiency. Changes in operational . availability resulting from changes in TBO policy, major inspection policies, failure rates , Not...Operationally Ready Supply (NORS) rates , and utilization rates were consistent with actual data from the field. The conclusions contained herein are...simulation runs on sensitivity, credibility, and sufficiency. Changes in utilization, failure rate , N0RS waiting time^ /fcC .1 ,i

  17. Support to Special Operations

    DTIC Science & Technology

    2011-05-01

    are documented in the end notes and bibliography. ABSTRACT AUTHOR: COL Thomas J. Rogers TITLE: Support to Special Operations FORMAT...SOF logistics. 13 END NOTES 1 U.S. Army Special Forces, THE GREEN BERETS, Special Forces History and Origins. Special Operations.Com

  18. STARPAHC operational report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The results of the first one and one-half years of operation of the STARPAHC system are presented. An operational cost summary analysis is included as well as the following; (1) Medical evaluation results, (2) system usage, and (3) hardware evaluation results.

  19. Basic Sewage Treatment Operation.

    ERIC Educational Resources Information Center

    Ontario Ministry of the Environment, Toronto.

    This manual was developed for use at workshops designed to introduce operators to the fundamentals of sewage plant operation. The course consists of lecture-discussions and hands-on activities. Each of the lessons has clearly stated behavioral objectives to tell the trainee what he should know or do after completing that topic. Areas covered in…

  20. Joint Newspaper Operating Agreements.

    ERIC Educational Resources Information Center

    Parsons, Marie

    The number of competing daily newspapers in American cities has dwindled until only about 50 cities boast two papers. Of the newspapers in those cities, 23 now maintain separate editorial operations but have joint printing, advertising, and circulation departments. The concept of joint operation is 50 years old, dating from the Depression years…

  1. Video Telescope Operating Microscopy.

    PubMed

    Divers, Stephen J

    2015-09-01

    Exotic pet veterinarians frequently have to operate on small animals, and magnification is commonly used. Existing endoscopy equipment can be used with a mechanical arm and telescope to enable video telescope operating microscopy. The additional equipment items and their specifics are described, and several case examples are provided. Copyright © 2015 Elsevier Inc. All rights reserved.

  2. Custodial Operations: Green & Sustainable

    ERIC Educational Resources Information Center

    Campbell, J. Kirk

    2008-01-01

    Custodial Operations can have a significant impact on institutional green and sustainable goals if given the proper support and challenge. This article describes the green and sustainable custodial operations in place at Carleton College in Northfield, Minnesota. The article reviews the college's sustainable efforts on biodegradables, packaging,…

  3. Waterworks Operator Training Manual.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    Sixteen self-study waterworks operators training modules are provided. Module titles are the following: basic mathematics, basic chemistry, analysis procedures, microbiology, basic electricity, hydraulics, chlorination, plant operation, surface water, ground water, pumps, cross connections, distribution systems, safety, public relations, and…

  4. Multinational Operations (REV)

    DTIC Science & Technology

    2007-03-07

    military operations with an acceptable level of risk . See JP 3-0, Joint Operations, and JP 4-02, Health Service Support, for information on planning...perform their mission. It will also ensure that the associated risks in utilizing contingency contracting support (force protection, health issues...Support ............................................................................................. III-36 • Health Service Support

  5. Special Operation. Module 20.

    ERIC Educational Resources Information Center

    South Carolina State Dept. of Education, Columbia. Office of Vocational Education.

    This module on special operations, one in a series dealing with industrial sewing machines, their attachments, and operation, covers two topics: topstitching and mitering. For each topic these components are provided: an introduction, directions, an objective, learning activities, student information, a student self-check, and a check-out…

  6. Equipment Operator 1 & C.

    ERIC Educational Resources Information Center

    Naval Education and Training Program Development Center, Pensacola, FL.

    The Rate Training Manual and Nonresident Career Course (RTM/NRCC) form a self-study package to assist Navy Equipment Operators First and Chief in fulfilling the requirements of their rating. (Navy Equipment Operators First and Chief direct and coordinate efforts of individuals and crews in construction, earthmoving, roadbuilding, quarrying, and…

  7. Extensible Operating System Security

    DTIC Science & Technology

    2002-09-01

    systems include SPIN [3] and the Exokernel [6] architecture, although each has major conceptual differences in terms of the fundamental approach that was...Jr., “ Exokernel : An Operating System achitecture for Application-level Resource Management”, Proc. of the 15th ACM Symposium on Operating Systems

  8. Joint Newspaper Operating Agreements.

    ERIC Educational Resources Information Center

    Parsons, Marie

    The number of competing daily newspapers in American cities has dwindled until only about 50 cities boast two papers. Of the newspapers in those cities, 23 now maintain separate editorial operations but have joint printing, advertising, and circulation departments. The concept of joint operation is 50 years old, dating from the Depression years…

  9. Operational Shock Complexity Theory

    DTIC Science & Technology

    2005-05-26

    Utility Targeting: Toward Axiological Air Operations.” Aerospace Power Journal (Winter 2000): 45-59. 54 The US Army has developed Warden’s circles by...Targeting. Toward Axiological Operations.” Aerospace Power Journal Vol. 14, Iss. 4 (Winter 2000): 45-59. 109 Government Documents Department of

  10. Operational sounding algorithms

    NASA Technical Reports Server (NTRS)

    Smith, W. L.

    1980-01-01

    The analytical equations used to interpret TIROS-N sounding radiances for operational applications are presented. Both the National Environmental Satellite System (NESS) Global Operational Synoptic Scale and the NESS/University of Wisconsin (UW) North American Mesoscale Sounding Production Systems are considered.

  11. Equipment Operator 1 & C.

    ERIC Educational Resources Information Center

    Naval Education and Training Program Development Center, Pensacola, FL.

    The Rate Training Manual and Nonresident Career Course (RTM/NRCC) form a self-study package to assist Navy Equipment Operators First and Chief in fulfilling the requirements of their rating. (Navy Equipment Operators First and Chief direct and coordinate efforts of individuals and crews in construction, earthmoving, roadbuilding, quarrying, and…

  12. Basic Sewage Treatment Operation.

    ERIC Educational Resources Information Center

    Ontario Ministry of the Environment, Toronto.

    This manual was developed for use at workshops designed to introduce operators to the fundamentals of sewage plant operation. The course consists of lecture-discussions and hands-on activities. Each of the lessons has clearly stated behavioral objectives to tell the trainee what he should know or do after completing that topic. Areas covered in…

  13. Nuclear Powerplant Safety: Operations.

    ERIC Educational Resources Information Center

    Department of Energy, Washington, DC. Nuclear Energy Office.

    Powerplant systems and procedures that ensure the day-to-day health and safety of people in and around the plant is referred to as operational safety. This safety is the result of careful planning, good engineering and design, strict licensing and regulation, and environmental monitoring. Procedures that assure operational safety at nuclear…

  14. Operation: Save Aunt Sally

    ERIC Educational Resources Information Center

    Zorin, Barbara; Carver, David, Jr.

    2015-01-01

    In grade 6, students should be able to "perform arithmetic operations, including those involving whole-number exponents, in the conventional order when there are no parentheses to specify a particular order" (p. 44). In grades 7 and 8, the rules of order of operations are used to simplify progressively complicated expressions and in…

  15. Aircraft operations management manual

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The NASA aircraft operations program is a multifaceted, highly diverse entity that directly supports the agency mission in aeronautical research and development, space science and applications, space flight, astronaut readiness training, and related activities through research and development, program support, and mission management aircraft operations flights. Users of the program are interagency, inter-government, international, and the business community. This manual provides guidelines to establish policy for the management of NASA aircraft resources, aircraft operations, and related matters. This policy is an integral part of and must be followed when establishing field installation policy and procedures covering the management of NASA aircraft operations. Each operating location will develop appropriate local procedures that conform with the requirements of this handbook. This manual should be used in conjunction with other governing instructions, handbooks, and manuals.

  16. Managing drilling operations

    SciTech Connect

    Fraser, K.; Peden, J.; Kenworth, A.

    1991-01-01

    Oil and gas well drilling operations requires the management of a great variety of operations, equipment, people, finances, legal aspects and safety procedures. A thorough understanding of the drilling process and the technologies involved is required to complete a project successfully, on time and within budget. This book presents guidance on the whole sequence of this process from field evaluation and well planning to drilling and optimization for both on- and off-shore projects. There are step-by-step guidelines and checklist which the practitioner can use directly, or with their own modifications. The author has refined these guidelines from his nineteen years of experience managing drilling operations around the world. Graduates in petroleum engineering and economic geology, as well as drilling engineers and drilling operations managers will welcome this handbook for its comprehensive and clear treatment of all the management issue and technologies required for a safe, efficient and economic drilling operation.

  17. Operational Framework for Nonlocality

    NASA Astrophysics Data System (ADS)

    Gallego, Rodrigo; Würflinger, Lars Erik; Acín, Antonio; Navascués, Miguel

    2012-08-01

    Because of the importance of entanglement for quantum information purposes, a framework has been developed for its characterization and quantification as a resource based on the following operational principle: entanglement among N parties cannot be created by local operations and classical communication, even when N-1 parties collaborate. More recently, nonlocality has been identified as another resource, alternative to entanglement and necessary for device-independent quantum information protocols. We introduce an operational framework for nonlocality based on a similar principle: nonlocality among N parties cannot be created by local operations and allowed classical communication even when N-1 parties collaborate. We then show that the standard definition of multipartite nonlocality, due to Svetlichny, is inconsistent with this operational approach: according to it, genuine tripartite nonlocality could be created by two collaborating parties. We finally discuss alternative definitions for which consistency is recovered.

  18. Stirling machine operating experience

    NASA Technical Reports Server (NTRS)

    Ross, Brad; Dudenhoefer, James E.

    1991-01-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that Stirling machines are capable of reliable and lengthy lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and were not expected to operate for any lengthy period of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered.

  19. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 1, Summary

    SciTech Connect

    Not Available

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public.

  20. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    SciTech Connect

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  1. Stirling machine operating experience

    SciTech Connect

    Ross, B.; Dudenhoefer, J.E.

    1994-09-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

  2. [Ross operation in Chile].

    PubMed

    Turner G, Eduardo; Muñoz C, Rodrigo; Cumsille G, Miguel; Iturra U, Sebastián; Strodthoff R, Pablo; Ulzurrún T, Nicolás; Rodríguez A, Juan

    2010-04-01

    Donald Ross introduced the pulmonary autograft for aortic valve replacement with reconstruction of the right ventricular outflow tract with a homograft. Despite its advantages over conventional valve prostheses, the Ross Operation is performed in a minority of patients who need an aortic valve replacement throughout the world. To report the operative and long term results of a series of patients subjected to Ross operation in Chile. Between 1996 and 2006, 131 patients aged 35+/-11 years (62% males) were subjected to an aortic root replacement with a pulmonary autograft and reconstruction of the right ventricular outflow tract with a pulmonary homograft. Seventy percent had congenital valve disease. Associated procedures were done in 39%. Patients were followed for a mean of 56+/-30 months. Operative mortality was 2.3%. Two patients had the autografts replaced intraoperatively because of tears in the proximal suture line and one within a month of the operation after suffering autograft endocarditis. At last follow up all patients are in functional class 1 or 2. Autograft reoperations were done in two patients who developed dilation with valve regurgitation (both had aortic regurgitation as primary indication for aortic valve replacement). Three patients required reoperation for pulmonary homograft dysfunction. Another three patients had uneventful pregnancies with normal newborns. Actuarial freedom from any reoperation at 10 years is 93%. The Ross Operation has low operative morbidity and mortality with excellent long term results. Reoperations have been rare within 10 years of follow up both for the autograft or the homograft.

  3. Scientific Operation of LIGO

    NASA Astrophysics Data System (ADS)

    Sanders, Gary H.

    2003-04-01

    LIGO construction has been completed. The three interferometers at the two LIGO observatory sites (Livingston, Louisiana and Hanford, Washington) have been operated successfully as power-recycled Michelson interferometers with Fabry-Perot arm cavities. Commissioning of the interferometers has progressed to operating them simultaneously in this final optical configuration. Initial coincidence operation between the observatory sites has provided a full test of the detector hardware and software subsystems, and full operation of the data acquisition and data analysis systems. The LIGO Laboratory and the LIGO Scientific Collaboration are working together to exploit the early series of interleaved engineering and science runs to commission the detector and data systems, to provide a detailed characterization of the detector and to produce the first scientific results from LIGO. The operation of LIGO is also coordinated with operation of the GEO 600 detector, the TAMA 300 detector and the Allegro resonant mass detector. The status of this early operation, including the first science run during 2002, and the resulting data study will be presented. The support of the US National Science Foundation under Cooperative Agreement No. PHY - 0107417 is gratefully acknowledged.

  4. Magellan Telescopes operations 2008

    NASA Astrophysics Data System (ADS)

    Osip, David J.; Phillips, Mark M.; Palunas, Povilas; Perez, Frank; Leroy, M.

    2008-07-01

    The twin 6.5m Magellan Telescopes have been in routine operations at the Las Campanas Observatory in the Chilean Andes since 2001 and 2002 respectively. The telescopes are owned and operated by Carnegie for the benefit of the Magellan consortium members (Carnegie Institution of Washington, Harvard University, the University of Arizona, Massachusetts Institute of Technology, and the University of Michigan). This paper provides an up to date review of the scientific, technical, and administrative structure of the 'Magellan Model' for observatory operations. With a modest operations budget and a reasonably small staff, the observatory is operated in the "classical" mode, wherein the visiting observer is a key member of the operations team. Under this model, all instrumentation is supplied entirely by the consortium members and the various instrument teams continue to play a critical support role beyond initial deployment and commissioning activities. Here, we present a critical analysis of the Magellan operations model and suggest lessons learned and changes implemented as we continue to evolve an organizational structure that can efficiently deliver a high scientific return for the investment of the partners.

  5. CAM operated fuel valve

    SciTech Connect

    Kelly, S.T.; Katchka, J.R.

    1991-09-03

    This patent describes improvement in a fuel control valve construction comprising a housing means having an inlet means adapted to be interconnected to a fuel source and a main outlet means adapted to be interconnected to a main burner means, the housing means having a main valve seat for interconnecting the inlet means with the main outlet means, the housing means having a movable main valve member for opening and closing the main valve seat, the housing means having a movable lever operatively associated with the main valve member and having a manually operable actuator means for controlling the operating positions of the lever, the lever having an intermediate cam follower portion and opposed ends disposed on each side of the cam follower portion with one end of the opposed ends being pivotally mounted to the housing means and with the other end of the opposed ends for operating the main valve member, the housing means having biasing means operatively interconnected to the lever to tend to pivot the lever in one direction that opens the main valve member away from its the main valve seat. The improvement comprises; the housing means has a thermostatically controlled means that is operatively associated with the lever and is adapted to engage and hold the lever in a position wherein the main valve member is in a closed condition against its the main valve seat when the thermostatically controlled means is in one operating condition thereof and the actuator means is in the on condition thereof.

  6. NSI operations center

    NASA Technical Reports Server (NTRS)

    Zanley, Nancy L.

    1991-01-01

    The NASA Science Internet (NSI) Network Operations Staff is responsible for providing reliable communication connectivity for the NASA science community. As the NSI user community expands, so does the demand for greater interoperability with users and resources on other networks (e.g., NSFnet, ESnet), both nationally and internationally. Coupled with the science community's demand for greater access to other resources is the demand for more reliable communication connectivity. Recognizing this, the NASA Science Internet Project Office (NSIPO) expands its Operations activities. By January 1990, Network Operations was equipped with a telephone hotline, and its staff was expanded to six Network Operations Analysts. These six analysts provide 24-hour-a-day, 7-day-a-week coverage to assist site managers with problem determination and resolution. The NSI Operations staff monitors network circuits and their associated routers. In most instances, NSI Operations diagnoses and reports problems before users realize a problem exists. Monitoring of the NSI TCP/IP Network is currently being done with Proteon's Overview monitoring system. The Overview monitoring system displays a map of the NSI network utilizing various colors to indicate the conditions of the components being monitored. Each node or site is polled via the Simple Network Monitoring Protocol (SNMP). If a circuit goes down, Overview alerts the Network Operations staff with an audible alarm and changes the color of the component. When an alert is received, Network Operations personnel immediately verify and diagnose the problem, coordinate repair with other networking service groups, track problems, and document problem and resolution into a trouble ticket data base. NSI Operations offers the NSI science community reliable connectivity by exercising prompt assessment and resolution of network problems.

  7. Quantum Operation Time Reversal

    SciTech Connect

    Crooks, Gavin E.

    2008-03-25

    The dynamics of an open quantum system can be described by a quantum operation: A linear, complete positive map of operators. Here, I exhibit a compact expression for the time reversal of a quantum operation, which is closely analogous to the time reversal of a classical Markov transition matrix. Since open quantum dynamics are stochastic, and not, in general, deterministic, the time reversal is not, in general, an inversion of the dynamics. Rather, the system relaxes toward equilibrium in both the forward and reverse time directions. The probability of a quantum trajectory and the conjugate, time reversed trajectory are related by the heat exchanged with the environment.

  8. Operator spin foam models

    NASA Astrophysics Data System (ADS)

    Bahr, Benjamin; Hellmann, Frank; Kamiński, Wojciech; Kisielowski, Marcin; Lewandowski, Jerzy

    2011-05-01

    The goal of this paper is to introduce a systematic approach to spin foams. We define operator spin foams, that is foams labelled by group representations and operators, as our main tool. A set of moves we define in the set of the operator spin foams (among other operations) allows us to split the faces and the edges of the foams. We assign to each operator spin foam a contracted operator, by using the contractions at the vertices and suitably adjusted face amplitudes. The emergence of the face amplitudes is the consequence of assuming the invariance of the contracted operator with respect to the moves. Next, we define spin foam models and consider the class of models assumed to be symmetric with respect to the moves we have introduced, and assuming their partition functions (state sums) are defined by the contracted operators. Briefly speaking, those operator spin foam models are invariant with respect to the cellular decomposition, and are sensitive only to the topology and colouring of the foam. Imposing an extra symmetry leads to a family we call natural operator spin foam models. This symmetry, combined with assumed invariance with respect to the edge splitting move, determines a complete characterization of a general natural model. It can be obtained by applying arbitrary (quantum) constraints on an arbitrary BF spin foam model. In particular, imposing suitable constraints on a spin(4) BF spin foam model is exactly the way we tend to view 4D quantum gravity, starting with the BC model and continuing with the Engle-Pereira-Rovelli-Livine (EPRL) or Freidel-Krasnov (FK) models. That makes our framework directly applicable to those models. Specifically, our operator spin foam framework can be translated into the language of spin foams and partition functions. Among our natural spin foam models there are the BF spin foam model, the BC model, and a model corresponding to the EPRL intertwiners. Our operator spin foam framework can also be used for more general spin

  9. Operational Toxicology Research

    DTIC Science & Technology

    2006-08-01

    AFRL-HE-WP-TR-2006-0082 Operational Toxicology Research Darol E. Dodd MaryAnn Angell Alion Science and Technology Wright-Patterson AFB, OH 45433...CONTRACT NUMBER Operational Toxicology Research Contract F336l5-00-C-6060 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHORISI 5d. PROJECT NUMBER...AFRLlWS 06-1865 14. ABSTRACT This is a final report for the Operational Toxicology Research (OTR) Contract F33615-00-C-6060 initiated in March, 2001 to

  10. Operating Room Fire Safety

    PubMed Central

    Hart, Stuart R.; Yajnik, Amit; Ashford, Jeffrey; Springer, Randy; Harvey, Sherry

    2011-01-01

    Operating room fires are a rare but preventable danger in modern healthcare operating rooms. Optimal outcomes depend on all operating room personnel being familiar with their roles in fire prevention and fire management. Despite the recommendations of major safety institutes, this familiarity is not the current practice in many healthcare facilities. Members of the anesthesiology and the surgery departments are commonly not actively involved in fire safety programs, fire drills, and fire simulations that could lead to potential delays in prevention and management of intraoperative fires. PMID:21603334

  11. Temporary and Contracted Operations

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  12. Interoperability and Combined Operations.

    DTIC Science & Technology

    1981-06-15

    34Organization for Joint Operations," MIL RVW, 32:32-39, Feb 1953. Collins, Joseph L. "Building Strength for Western Defense," AID, 9:3-8, Jul 1954...34 MIL RVW, 26:3-9, Aug 1946; 26:10-16, Sep 1946. Johnston, Joseph W. "Combined Operations in Lower Units," MIL RVW, 32:56-62, Jul 1952. Lenschau...1950. Postlethwait, Edward M. "Unified Command in Theaters of Operations," MIL RVW, 29:23-30, Nov 1949. Priestley , H. "Let’s Stick Together," MIL RVW

  13. Commercialization in NASA Space Operations

    NASA Technical Reports Server (NTRS)

    Gilbert, Charlene E.

    1998-01-01

    Various issues associated with commercialization in NASA space operations are presented in viewgraph form. Specific topics include: 1) NASA's financial outlook; 2) Space operations; 3) Space operations technology; and 4) Strategies associated with these operations.

  14. CH Packaging Operations Manual

    SciTech Connect

    Washington TRU Solutions LLC

    2005-06-13

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  15. CALIPSO Instrument Operational

    Atmospheric Science Data Center

    2014-09-18

    CALIPSO Instrument Operational Thursday, September 11, 2014 The CALIPSO payload is back in data acquisition mode as of Wednesday, September 17, 2014.  CALIPSO data processing has returned to a nominal state, and...

  16. Emergency Operation Center

    EPA Pesticide Factsheets

    EOC serves as the response operational focal point. A communication and coordination hub designed to increase data management and coordination abilities, provides communication support for Watch Officer, Homeland Security, regional and field assets.

  17. Operator Certification Study Guide.

    ERIC Educational Resources Information Center

    American Water Works Association, Denver, CO.

    This study guide contains typical questions and answers that all levels of water treatment plant operators might expect to find on a certification examination. The manual covers the basic sciences, treatment techniques, testing procedures, and federal legislation. (Author/SB)

  18. Operating plan FY 1998

    SciTech Connect

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  19. Symmetry operation measures.

    PubMed

    Pinsky, Mark; Casanova, David; Alemany, Pere; Alvarez, Santiago; Avnir, David; Dryzun, Chaim; Kizner, Ziv; Sterkin, Alexander

    2008-01-30

    We introduce a new mathematical tool for quantifying the symmetry contents of molecular structures: the Symmetry Operation Measures. In this approach, we measure the minimal distance between a given structure and the structure which is obtained after applying a selected symmetry operation on it. If the given operation is a true symmetry operation for the structure, this distance is zero; otherwise it gives an indication of how different the transformed structure is from the original one. Specifically, we provide analytical solutions for measures of all the improper rotations, S n p, including mirror symmetry and inversion, as well as for all pure rotations, C n p. These measures provide information complementary to the Continuous Symmetry Measures (CSM) that evaluate the distance between a given structure and the nearest structure which belongs to a selected symmetry point-group.

  20. Space Medicine Medical Operations

    NASA Image and Video Library

    This is an overview of the Space and Clinical Operations Division whose mission is to optimize the health, fitness and well-being of flight crews, their dependents and employees of the Johnson Spac...

  1. Enabler operator station

    NASA Technical Reports Server (NTRS)

    Bailey, Andrea; Kietzman, John; King, Shirlyn; Stover, Rae; Wegner, Torsten

    1992-01-01

    The objective of this project was to design an onboard operator station for the conceptual Lunar Work Vehicle (LWV). The LWV would be used in the colonization of a lunar outpost. The details that follow, however, are for an Earth-bound model. The operator station is designed to be dimensionally correct for an astronaut wearing the current space shuttle EVA suit (which include life support). The proposed operator station will support and restrain an astronaut as well as to provide protection from the hazards of vehicle rollover. The threat of suit puncture is eliminated by rounding all corners and edges. A step-plate, located at the front of the vehicle, provides excellent ease of entry and exit. The operator station weight requirements are met by making efficient use of rigid members, semi-rigid members, and woven fabrics.

  2. Title V Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  3. Operator Certification Study Guide.

    ERIC Educational Resources Information Center

    American Water Works Association, Denver, CO.

    This study guide contains typical questions and answers that all levels of water treatment plant operators might expect to find on a certification examination. The manual covers the basic sciences, treatment techniques, testing procedures, and federal legislation. (Author/SB)

  4. Enabler operator station

    NASA Astrophysics Data System (ADS)

    Bailey, Andrea; Keitzman, John; King, Shirlyn; Stover, Rae; Wegner, Torsten

    The objective of this project was to design an onboard operator station for the conceptual Lunar Work Vehicle (LWV). This LWV would be used in the colonization of a lunar outpost. The details that follow, however, are for an earth-bound model. Several recommendations are made in the appendix as to the changes needed in material selection for the lunar environment. The operator station is designed dimensionally correct for an astronaut wearing the current space shuttle EVA suit (which includes life support). The proposed operator station will support and restrain an astronaut as well as provide protection from the hazards of vehicle rollover. The threat of suit puncture is eliminated by rounding all corners and edges. A step-plate, located at the front of the vehicle, provides excellent ease of entry and exit. The operator station weight requirements are met by making efficient use of grid members, semi-rigid members and woven fabrics.

  5. Nuclear material operations manual

    SciTech Connect

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  6. LCOGT network observatory operations

    NASA Astrophysics Data System (ADS)

    Pickles, Andrew; Hjelstrom, Annie; Boroson, Todd; Burleson, Ben; Conway, Patrick; De Vera, Jon; Elphick, Mark; Haworth, Brian; Rosing, Wayne; Saunders, Eric; Thomas, Doug; White, Gary; Willis, Mark; Walker, Zach

    2014-08-01

    We describe the operational capabilities of the Las Cumbres Observatory Global Telescope Network. We summarize our hardware and software for maintaining and monitoring network health. We focus on methodologies to utilize the automated system to monitor availability of sites, instruments and telescopes, to monitor performance, permit automatic recovery, and provide automatic error reporting. The same jTCS control system is used on telescopes of apertures 0.4m, 0.8m, 1m and 2m, and for multiple instruments on each. We describe our network operational model, including workloads, and illustrate our current tools, and operational performance indicators, including telemetry and metrics reporting from on-site reductions. The system was conceived and designed to establish effective, reliable autonomous operations, with automatic monitoring and recovery - minimizing human intervention while maintaining quality. We illustrate how far we have been able to achieve that.

  7. Emergency Operations Center

    EPA Pesticide Factsheets

    EOC serves as the response operational focal point. A communication and coordination hub designed to increase data management and coordination abilities, provides communication support for Watch Officer, Homeland Security, regional and field assets.

  8. Operator roles in robotics

    SciTech Connect

    Lyman, J.; Madni, A.M.

    1984-01-01

    The authors suggest that operator roles in robotics can be classified under the categories of monitor, manager, and maintainer. With increasingly sophisticated applications of machine intelligence, however, these roles will require explicit and continuing reassessment. 5 references.

  9. Operant Conditioning and Education.

    ERIC Educational Resources Information Center

    de Noronha, Mario

    A case study of a learning disabled 8-year-old with behavior disturbancs is presented to highlight the use of operant conditioning in cutting down educational costs and easing the teacher's class management problems. (CL)

  10. EPA Issued Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  11. Operation Waste Watch.

    ERIC Educational Resources Information Center

    Groover, Richard S.

    1981-01-01

    Operation Waste Watch is a seven-unit program for grades K-6 which addresses such topics as litter control, recycling, and resources recovery. It is designed to instill in students positive feelings about the environment. (DS)

  12. Animal Feeding Operations

    MedlinePlus

    ... dead animals, and production operations in one combined land space. According to EPA, AFOs create more than ... and death of fish populations. Nitrogen and phosphorus pollution can contribute to algal blooms which can potentially ...

  13. Influence Operations in Afghanistan

    DTIC Science & Technology

    2006-10-06

    strong central government and marginalizing the influence of radical religious groups who either engage in or support attacks on central government...decision makers are, who they trust, how resolute or tenacious a group is and how open to change a group is. Any Influence Operation must take these...as well as how each group perceives and interacts with other groups is pertinent to developing an effective Influence Operations plan. Pashtun

  14. Operation DOMINIC. Project Stemwinder

    DTIC Science & Technology

    1985-09-01

    Sampling was accomplished by the RB - 57 aircraft. The detonations Investigated were all air bursts over water during Operation Dominic I at Christmas...limits. III. Stem Cloud Penetration» An RB - 57 aircraft was available for stem penetration missions Irae- dlately following seven of the Dominic ...OPERATION DOMINIC Project Stemwinder (WT-2060)(EX) EXTRACTED VERSION I in 0) o < i D < G. J. Ferber Atmospheric Radioactivity Research

  15. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  16. Remotely Operated Robotic Firefighter

    DTIC Science & Technology

    1988-07-01

    when explosion of ordnance becomes a threat because of fire exposure on an aircraft. Many concepts were investigated to satisfy design criteria... satisfactory . An interim review was conducted on 28 May 1987 to review FDM design, fabrication, and testing. The major components of the remote-controlled...vicinity of the runways and taxiways. (3) Primary Mission Operational Scenarios The Operational Scenarios which satisfy the Primary Mission criteria are

  17. Operational waste volume projection

    SciTech Connect

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995.

  18. Operation Inherent Resolve

    DTIC Science & Technology

    2015-04-01

    model. OIR is a military mission included within a wider, complex, whole-of-government effort to counter ISIL and address the ongoing refugee crisis...DoS OIG made recom- mendations to improve the administration and monitoring of activi- ties with the Bureau of Population, Refugees and Migration (PRM...operations against ISIL in Iraq and Syria had been named Operation Inherent Resolve (OIR). OIR applied retroactively to all military airstrikes that had been

  19. Raven Operator Assessment Tool

    DTIC Science & Technology

    2012-03-01

    needed to effectively tailor home- unit Raven training to individual operator needs and skills . To enhance the ability of newly trained MTs to...to individual operator needs and skills . This inexperience points to the need for a practical supplementary training tool that helps new MTs...all unit-specific ATP needs . Nonetheless, because this tool focuses on fundamental rather than narrow skills , its applicability spans a range of unit

  20. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  1. Army Digitization Operational Impacts

    DTIC Science & Technology

    1999-06-01

    Army Digitization Operational Impacts Fred P. Stein MITRE Corporation HQS III Corps & Fort Hood ATTN: AFZF-DFCC Bldg. 1001, Rm. 316W Fort Hood, TX...one systems, necessary for minimum capability will be fielded to units at Fort Hood. This paper will describe the impact of these news systems on the...of the new technologies. Finally it will project the impact on the objective systems on the operational Army. This paper will provide a view of what

  2. Multiphase pumping - operation & control

    SciTech Connect

    Salis, J. de; Marolies, C. de; Falcimaigne, J.

    1996-12-31

    This paper reviews field issues related to the planning, installation and operation of the helico-axial multiphase pumps. Interest for multiphase production, which leads to simpler and smaller in-field installations, is primarily dictated by the need for more a cost effective production system. Multiphase pumping is essentially a means of adding energy to the unprocessed effluent which enables the liquid/gas mixture to be transported over long distances without the need for prior separation. The Poseidon helico-axial pumps, under normal operating conditions, are largely unaffected by process fluctuations at pump inlet (changes in pressure, liquid or gas flow rate). They have demonstrated a stable behavior (self-adaptive capability with regards to instantaneous changes). A multiphase pump set is designed to operate under changing/fluctuating process conditions. An important issue related to pump operability and flexibility has to do with the driver selection: fixed speed vs. variable speed. In some cases a fixed speed drive provides sufficient operational flexibility. In other cases variable speed can be chosen. Pump operation & control strategies are presented and discussed.

  3. Waste receiving and processing facility module 1, detailed design report

    SciTech Connect

    Not Available

    1993-10-01

    WRAP 1 baseline documents which guided the technical development of the Title design included: (a) A/E Statement of Work (SOW) Revision 4C: This DOE-RL contractual document specified the workscope, deliverables, schedule, method of performance and reference criteria for the Title design preparation. (b) Functional Design Criteria (FDC) Revision 1: This DOE-RL technical criteria document specified the overall operational criteria for the facility. The document was a Revision 0 at the beginning of the design and advanced to Revision 1 during the tenure of the Title design. (c) Supplemental Design Requirements Document (SDRD) Revision 3: This baseline criteria document prepared by WHC for DOE-RL augments the FDC by providing further definition of the process, operational safety, and facility requirements to the A/E for guidance in preparing the design. The document was at a very preliminary stage at the onset of Title design and was revised in concert with the results of the engineering studies that were performed to resolve the numerous technical issues that the project faced when Title I was initiated, as well as, by requirements established during the course of the Title II design.

  4. Operational Dynamic Configuration Analysis

    NASA Technical Reports Server (NTRS)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  5. Purposive discovery of operations

    NASA Technical Reports Server (NTRS)

    Sims, Michael H.; Bresina, John L.

    1992-01-01

    The Generate, Prune & Prove (GPP) methodology for discovering definitions of mathematical operators is introduced. GPP is a task within the IL exploration discovery system. We developed GPP for use in the discovery of mathematical operators with a wider class of representations than was possible with the previous methods by Lenat and by Shen. GPP utilizes the purpose for which an operator is created to prune the possible definitions. The relevant search spaces are immense and there exists insufficient information for a complete evaluation of the purpose constraint, so it is necessary to perform a partial evaluation of the purpose (i.e., pruning) constraint. The constraint is first transformed so that it is operational with respect to the partial information, and then it is applied to examples in order to test the generated candidates for an operator's definition. In the GPP process, once a candidate definition survives this empirical prune, it is passed on to a theorem prover for formal verification. We describe the application of this methodology to the (re)discovery of the definition of multiplication for Conway numbers, a discovery which is difficult for human mathematicians. We successfully model this discovery process utilizing information which was reasonably available at the time of Conway's original discovery. As part of this discovery process, we reduce the size of the search space from a computationally intractable size to 3468 elements.

  6. Autonomous mission operations

    NASA Astrophysics Data System (ADS)

    Frank, J.; Spirkovska, L.; McCann, R.; Wang, Lui; Pohlkamp, K.; Morin, L.

    NASA's Advanced Exploration Systems Autonomous Mission Operations (AMO) project conducted an empirical investigation of the impact of time delay on today's mission operations, and of the effect of processes and mission support tools designed to mitigate time-delay related impacts. Mission operation scenarios were designed for NASA's Deep Space Habitat (DSH), an analog spacecraft habitat, covering a range of activities including nominal objectives, DSH system failures, and crew medical emergencies. The scenarios were simulated at time delay values representative of Lunar (1.2-5 sec), Near Earth Object (NEO) (50 sec) and Mars (300 sec) missions. Each combination of operational scenario and time delay was tested in a Baseline configuration, designed to reflect present-day operations of the International Space Station, and a Mitigation configuration in which a variety of software tools, information displays, and crew-ground communications protocols were employed to assist both crews and Flight Control Team (FCT) members with the long-delay conditions. Preliminary findings indicate: 1) Workload of both crewmembers and FCT members generally increased along with increasing time delay. 2) Advanced procedure execution viewers, caution and warning tools, and communications protocols such as text messaging decreased the workload of both flight controllers and crew, and decreased the difficulty of coordinating activities. 3) Whereas crew workload ratings increased between 50 sec and 300 sec of time delay in the Baseline configuration, workload ratings decreased (or remained flat) in the Mitigation configuration.

  7. SSME Key Operations Demonstration

    NASA Technical Reports Server (NTRS)

    Anderson, Brian; Bradley, Michael; Ives, Janet

    1997-01-01

    A Space Shuttle Main Engine (SSME) test program was conducted between August 1995 and May 1996 using the Technology Test Bed (TTB) Engine. SSTO vehicle studies have indicated that increases in the propulsion system operating range can save significant weight and cost at the vehicle level. This test program demonstrated the ability of the SSME to accommodate a wide variation in safe operating ranges and therefore its applicability to the SSTO mission. A total of eight tests were completed with four at Marshall Space Flight Center's Advanced Engine Test Facility and four at the Stennis Space Center (SSC) A-2 attitude test stand. Key demonstration objectives were: 1) Mainstage operation at 5.4 to 6.9 mixture ratio; 2) Nominal engine start with significantly reduced engine inlet pressures of 50 psia LOX and 38 psia fuel; and 3) Low power level operation at 17%, 22%, 27%, 40%, 45%, and 50% of Rated Power Level. Use of the highly instrumented TTB engine for this test series has afforded the opportunity to study in great detail engine system operation not possible with a standard SSME and has significantly contributed to a greater understanding of the capabilities of the SSME and liquid rocket engines in general.

  8. Payload operation television system

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The TV system assembled is intended for laboratory experimentation which would develop operational techniques and lead to the design of space-borne TV equipment whose purpose would be to assist the astronaut-operator aboard a space station to load payload components. The TV system assembled for this program is a black and white, monocular, high performance system. The equipment consists principally of a good quality TV camera capable of high resolving power; a TV monitor; a sync generator for driving camera and monitor; and two pan/tilt units which are remotely controlled by the operator. One pan/tilt unit provides control of the pointing of the camera, the other similarly controls the position of a simulated payload.

  9. Computerized operating procedures

    SciTech Connect

    Ness, E.; Teigen, J.

    1994-12-31

    A number of observed and potential problems in the nuclear industry are related to the quality of operating procedures. Many of the problems identified in operating procedure preparation, implementation, and maintenance have a technical nature, which can be directly addressed by developing computerized procedure handling tools. The Halden Reactor Project (HRP) of the Organization for Economic Cooperation and Development has since 1985 performed research work within this field. A product of this effort is the development of a second version of the computerized operation manuals (COPMA) system. This paper summarizes the most important characteristics of the COPMA-II system and discusses some of the experiences in using a system like COPMA-II.

  10. ORNL radioactive waste operations

    SciTech Connect

    Sease, J.D.; King, E.M.; Coobs, J.H.; Row, T.H.

    1982-01-01

    Since its beginning in 1943, ORNL has generated large amounts of solid, liquid, and gaseous radioactive waste material as a by-product of the basic research and development work carried out at the laboratory. The waste system at ORNL has been continually modified and updated to keep pace with the changing release requirements for radioactive wastes. Major upgrading projects are currently in progress. The operating record of ORNL waste operation has been excellent over many years. Recent surveillance of radioactivity in the Oak Ridge environs indicates that atmospheric concentrations of radioactivity were not significantly different from other areas in East Tennesseee. Concentrations of radioactivity in the Clinch River and in fish collected from the river were less than 4% of the permissible concentration and intake guides for individuals in the offsite environment. While some radioactivity was released to the environment from plant operations, the concentrations in all of the media sampled were well below established standards.

  11. About APPLE II Operation

    SciTech Connect

    Schmidt, T.; Zimoch, D.

    2007-01-19

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  12. Achieving TASAR Operational Readiness

    NASA Technical Reports Server (NTRS)

    Wing, David J.

    2015-01-01

    NASA has been developing and testing the Traffic Aware Strategic Aircrew Requests (TASAR) concept for aircraft operations featuring a NASA-developed cockpit automation tool, the Traffic Aware Planner (TAP), which computes traffic/hazard-compatible route changes to improve flight efficiency. The TAP technology is anticipated to save fuel and flight time and thereby provide immediate and pervasive benefits to the aircraft operator, as well as improving flight schedule compliance, passenger comfort, and pilot and controller workload. Previous work has indicated the potential for significant benefits for TASAR-equipped aircraft, and a flight trial of the TAP software application in the National Airspace System has demonstrated its technical viability. This paper reviews previous and ongoing activities to prepare TASAR for operational use.

  13. Internet Based Remote Operations

    NASA Technical Reports Server (NTRS)

    Chamberlain, James

    1999-01-01

    This is the Final Report for the Internet Based Remote Operations Contract, has performed payload operations research support tasks March 1999 through September 1999. These tasks support the GSD goal of developing a secure, inexpensive data, voice, and video mission communications capability between remote payload investigators and the NASA payload operations team in the International Space Station (ISS) era. AZTek has provided feedback from the NASA payload community by utilizing its extensive payload development and operations experience to test and evaluate remote payload operations systems. AZTek has focused on use of the "public Internet" and inexpensive, Commercial-off-the-shelf (COTS) Internet-based tools that would most benefit "small" (e.g., $2 Million or less) payloads and small developers without permanent remote operations facilities. Such projects have limited budgets to support installation and development of high-speed dedicated communications links and high-end, custom ground support equipment and software. The primary conclusions of the study are as follows: (1) The trend of using Internet technology for "live" collaborative applications such as telescience will continue. The GSD-developed data and voice capabilities continued to work well over the "public" Internet during this period. 2. Transmitting multiple voice streams from a voice-conferencing server to a client PC to be mixed and played on the PC is feasible. 3. There are two classes of voice vendors in the market: - Large traditional phone equipment vendors pursuing integration of PSTN with Internet, and Small Internet startups.The key to selecting a vendor will be to find a company sufficiently large and established to provide a base voice-conferencing software product line for the next several years.

  14. Analysis of operator participation

    NASA Technical Reports Server (NTRS)

    Zarakovskiy, G. M.; Zinchenko, V. P.

    1973-01-01

    The problem of providing a psychological conception of the analysis of operator participation in a form that will allow the qualitative approach to be combined with the quantitative approach is examined. This conception is based on an understanding of the essence of human endeavor in automated control systems that now determine the development of society's productive forces and that are the main object of ergonomic research. Two main types of operator participation were examined; information retrieval with immediate service and information retrieval with delayed service.

  15. The operator's emotional stability

    NASA Technical Reports Server (NTRS)

    Zilberman, P. B.

    1975-01-01

    An attempt is made to provide a psychological interpretation of the concept of emotional stability in connection with other psychics qualities of an operator's personality. Emotional stability is understood as a person's capacity to control his emotional state for the purpose of maintaining the necessary level of work performance under extreme stress conditions. By modeling the operator's sensorimotor activity and by comparing the productivity indicators under ordinary conditions with those obtained during work involving an emotional load, the level of emotional stability can be determined.

  16. Shuttle operational expectations

    NASA Technical Reports Server (NTRS)

    Abrahamson, J. A.

    1982-01-01

    The results of orbital flight tests (OFT) of the Space Shuttle are reviewed, and modifications planned for upcoming operational flights are discussed. The performance of the solid rocket boosters, external tank, main engines, structural system, propulsion system, reaction control system, electric power system, heat rejection system, hydraulic system, avionics, and other systems is described and evaluated as generally highly satisfactory. Payload servicing and deployment were also successfully demonstrated by OFT. Additional facilities planned for the operational flights are briefly described, and improvements that will make the Challenger spacecraft lighter than Columbia, provide it with more thrust, and give it a larger payload are summarized. Some software modifications being introduced are also mentioned.

  17. Intracranial surgical operative apparatus

    NASA Technical Reports Server (NTRS)

    Sheldon, Charles H. (Inventor); Frazer, Robert E. (Inventor); Lutes, Harold R. (Inventor)

    1983-01-01

    Apparatus for operating on the brain with minimal disturbances thereto, including a bullet-shaped expandable device with an end that can be closed for insertion through a small hole in the brain. The device can be expanded after insertion to leave an air pocket through which to extend viewing and cutting devices which enable operation on tumors or the like that lie at the end of the expanded device. A set of probes of varying diameters are also provided, to progressively enlarge a passage leading to the tumor, prior to inserting the expandable device.

  18. Analysis of operator participation

    NASA Technical Reports Server (NTRS)

    Zarakovskiy, G. M.; Zinchenko, V. P.

    1973-01-01

    The problem of providing a psychological conception of the analysis of operator participation in a form that will allow the qualitative approach to be combined with the quantitative approach is examined. This conception is based on an understanding of the essence of human endeavor in automated control systems that now determine the development of society's productive forces and that are the main object of ergonomic research. Two main types of operator participation were examined; information retrieval with immediate service and information retrieval with delayed service.

  19. Operative management of appendicitis.

    PubMed

    St Peter, Shawn D; Snyder, Charles L

    2016-08-01

    Appendectomy has been the standard of care for appendicitis since the late 1800s, and remains one of the most common operations performed in children. The advent of data-driven medicine has led to questions about every aspect of the operation-whether appendectomy is even necessary, when it should be performed (timing), how the procedure is done (laparoscopic variants versus open and irrigation versus no irrigation), length of hospital stay, and antibiotic duration. The goal of this analysis is to review the current status of, and available data regarding, the surgical management of appendicitis in children. Copyright © 2016 Elsevier Inc. All rights reserved.

  20. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  1. Alkaline battery operational methodology

    SciTech Connect

    Sholklapper, Tal; Gallaway, Joshua; Steingart, Daniel; Ingale, Nilesh; Nyce, Michael

    2016-08-16

    Methods of using specific operational charge and discharge parameters to extend the life of alkaline batteries are disclosed. The methods can be used with any commercial primary or secondary alkaline battery, as well as with newer alkaline battery designs, including batteries with flowing electrolyte. The methods include cycling batteries within a narrow operating voltage window, with minimum and maximum cut-off voltages that are set based on battery characteristics and environmental conditions. The narrow voltage window decreases available capacity but allows the batteries to be cycled for hundreds or thousands of times.

  2. Personnel Targeting Operations

    DTIC Science & Technology

    2007-11-02

    10 Barbary Pirates and Sherif Ahmed El Raisuli...success. The Navy went after Sherif Ahmed el Raisuli, a Moroccan known as the last of the Barbary pirates, and leaned on his host country to force him to...Two countries that have conducted successful manhunt operations are Israel and France. Israel formed the Mossad in 1951. the Mossad developed

  3. Engineer Equipment Operator.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, deals with the skills needed by engineer equipment operators. Addressed in the seven individual units of the course are the following topics: introduction to Military Occupation Specialty (MOS) 1345…

  4. Installing and operating FEGTEMs

    SciTech Connect

    Hetherington, C.J.; Cullis, A.G.; Walker, S.; Turner, J.; Nelson, E.C.; O'Keefe, M.A.

    1997-11-03

    In order to operate at full potential, Field-Emission-Gun Transmission Electron Microscopes (FEG-TEMs) require special environments designed to minimize the effects of vibration and electromagnetic noise. This report shows how careful attention to these details can enable such instruments to achieve their design parameters and produce information transfer to sub-Angstrom resolutions.

  5. Foot Operation of Controls

    DTIC Science & Technology

    1971-01-01

    in which the maximum force may be applied ’. 2.6. Foot versus Hand Operation of Controls Grether (1946) investigated tracking accuracy with...airplane controls. Technical Note 550, National Advisory Committee for Aeronautics, Washington, D.C. GRETHER , W. P., 1946, A study of several

  6. Fueling Operational Maneuver

    DTIC Science & Technology

    1990-05-29

    is heavier than petroleum products. 7 5 TM 5-34.X p. 3-51 to 3-54 provides the basic data for this calculation. 76 David Gorczynski and David Auman ...Fast, William R. "Operational Level Support: In Search of Doctrine," Military Review, February 1988, pp. 46-52. Gorczynski, David, and David Auman

  7. Operations Policy Manual, 2012

    ERIC Educational Resources Information Center

    Teacher Education Accreditation Council, 2011

    2011-01-01

    The Teacher Education Accreditation Council's (TEAC's) "Operations Policy Manual" outlines all of TEAC's current policies and procedures related to TEAC members, TEAC administration, and the public, and includes the Bylaws of the Teacher Education Accreditation Council. Contents include: (1) Policies Related to TEAC Members; (2) Policies Related…

  8. Operations Policy Manual, 2010

    ERIC Educational Resources Information Center

    Teacher Education Accreditation Council, 2010

    2010-01-01

    The Teacher Education Accreditation Council (TEAC) "Operations Policy Manual" outlines all of TEAC's current policies and procedures related to TEAC members, TEAC administration, and the public, and includes the Bylaws of the Teacher Education Accreditation Council, Inc. An index is also included.

  9. CALIPSO Instrument Operational

    Atmospheric Science Data Center

    2014-03-05

    ... being briefly in data acquisition mode, the CALIPSO payload computer (PLC) was commanded OFF due to another solar event earlier this ... remain above the 10MeV threshold for laser operations. Science data is not acquired while the payload is in SAFE mode.   ...

  10. Electromagnetically Operated Counter

    DOEpatents

    Goldberg, H D; Goldberg, M I

    1951-12-18

    An electromagnetically operated counter wherein signals to be counted are applied to cause stepwise rotation of a rotatable element which is connected to a suitable register. The mechanism involved consists of a rotatable armature having three spaced cores of magnetic material and a pair of diametrically opposed electromagnets with a suitable pulsing circuit to actuate the magnets.

  11. OPERATION PEBBLE. SUMMARY REPORT.

    ERIC Educational Resources Information Center

    NORRED, ROBERT B.

    A COMPREHENSIVE EVALUATION OF OPERATION PEBBLE'S 3 YEAR SUMMER PROGRAM FOR ECONOMICALLY AND EDUCATIONALLY DEPRIVED CHILDREN OF THE UPPER CUMBERLAND REGION OF TENNESSEE IS PRESENTED. THE INTENT OF THE PROJECT WAS TO INVOLVE THE CHILDREN IN EXPERIENCES THAT MIGHT EXPAND THE HORIZONS OF THEIR STAGNANT, HIGHLY STRUCTURED CULTURAL ENVIRONMENT, WITHOUT…

  12. OPERATION ALPHABET, 1.

    ERIC Educational Resources Information Center

    COATES, ROBERT H., ED.

    OPERATION ALPHABET 1 IS THE FIRST OF A SERIES OF WORKBOOKS PLANNED TO HELP ADULTS LEARN TO READ AND WRITE. EACH OF THE 100 LESSONS DEVELOPS ONE IDEA OF INTEREST TO ADULTS, EMPHASIZING KEY WORDS AND PRACTICE WRITING EXERCISES. WORDS USED IN THE LESSONS ARE DEFINED AT THE END OF THE BOOK. THIS DOCUMENT IS AVAILABLE FROM NOBLE AND NOBLE, PUBLISHERS,…

  13. Operation Rescue. Final Report.

    ERIC Educational Resources Information Center

    McKee, Neena; Crawford, Georgette

    The Operation Rescue project was designed to develop a classroom setting for the delivery of comprehensive educational services to "at risk" young adolescents. The classroom was established as part of the pre-existing Jonesboro Alternative School, and it utilized the basic academic and social program developed by this entity over 12…

  14. Research to operations

    NASA Astrophysics Data System (ADS)

    Powell, Alfred M., Jr.; Goldberg, Mitch; Colton, Marie

    2005-08-01

    The process of transitioning new environmental satellite products and algorithms into operations is a challenging task. Within NOAA's Office of Research and Applications, this transition process is evolving to satisfy the more stringent algorithm requirements for the next generation of satellite users. Taking algorithm research into operations means modifying old processes to suit users' increased need for more accurate, reliable and timely remotely sensed products. At the same time, the entire end-to-end process must support the processing of more complex data, higher data volumes due to increased spatial resolution and improved monitoring latencies, increased satellite coverage, increased spectral bands, and multi-disciplinary products. The products and data also need meta-data about instrument status, shifts in product accuracy, and other information that affect product quality for today's increasingly sophisticated user. These needs are stretching traditional scientific research skills into multi-disciplinary tasks that require an understanding of processes not usually equated with scientific algorithm development and include instrument operation, systems engineering, information technology approaches, data fusion, data assimilation, and related capabilities. These added capabilities require new approaches, and skills, for dealing with this multifaceted problem. Steps for improving algorithm research to operations processes will be identified, discussed and compared to past methods.

  15. Operations and Modeling Analysis

    NASA Technical Reports Server (NTRS)

    Ebeling, Charles

    2005-01-01

    The Reliability and Maintainability Analysis Tool (RMAT) provides NASA the capability to estimate reliability and maintainability (R&M) parameters and operational support requirements for proposed space vehicles based upon relationships established from both aircraft and Shuttle R&M data. RMAT has matured both in its underlying database and in its level of sophistication in extrapolating this historical data to satisfy proposed mission requirements, maintenance concepts and policies, and type of vehicle (i.e. ranging from aircraft like to shuttle like). However, a companion analyses tool, the Logistics Cost Model (LCM) has not reached the same level of maturity as RMAT due, in large part, to nonexistent or outdated cost estimating relationships and underlying cost databases, and it's almost exclusive dependence on Shuttle operations and logistics cost input parameters. As a result, the full capability of the RMAT/LCM suite of analysis tools to take a conceptual vehicle and derive its operations and support requirements along with the resulting operating and support costs has not been realized.

  16. Subsistence Operations Career Ladder.

    DTIC Science & Technology

    1987-04-01

    AND DELIVERING SUBSIS- TENCE AND EQUIPMENT 8 4 K PERFORMING MEAT PROCESSING FUNCTIONS 1 * L PERFORMING COMMISSARY CONTROL AND MANAGEMENT FUNCTIONS 4...PERFORMING MEAT PROCESSING FUNCTIONS 1 L PERFORMING COMMISSARY CONTROL AND MANAGEMENT FUNCTIONS 4 M OPERATING GROCERY, MEAT, AND PRODUCE DEPARTMENTS

  17. Operating efficiency of computers

    NASA Technical Reports Server (NTRS)

    Pac, J.

    1977-01-01

    A method is outlined which can be used to guarantee to users of computing systems a measure of operating efficiency. The monthly utilization coefficient should be equal to or exceed a value agreed on in advance. In addition, the repair time during a computer breakdown should not be longer than a period agreed on in advance.

  18. Operation Alaskan Road

    DTIC Science & Technology

    2008-03-01

    equipment and personnel. Equipment Maintenance and Fueling Operations. Hemlock Bay con- sisted of a K-span building that housed the maintenance...large trees from growing, although stunted shore pine, cottonwood, some species of willow, and black spruce can be found. Stepping on muskeg is

  19. T2 Install Operations

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043639 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  20. Enforcement Field Operations Manual.

    ERIC Educational Resources Information Center

    Colorado State Dept. of Health, Denver. Div. of Air Pollution Control.

    This manual is designed as a practical handbook for air pollution control officials. A variety of situations and tasks encountered in field operations are described and the appropriate action which should be taken is explained Topics include source detection, source inspection, recording and reporting inspections, maintaining a recording system,…

  1. Operation C O P

    ERIC Educational Resources Information Center

    Mueck, Robert P.; Parker, Ashley

    2011-01-01

    Sometimes one never knows what sparks an idea or causes people to come together and take something forward. An example of this is Operation COP at the University of Maryland in College Park. Their version of the "See Something, Say Something" campaign is being touted as a crime prevention program, while it is at the same time an…

  2. Novel operative treatment options.

    PubMed

    Ricketts, D N J; Pitts, N B

    2009-01-01

    There are an increasing number of more novel options available for operative intervention. This chapter outlines a series of operative treatment options which are available to the modern clinician to select from once a decision has been made to treat a carious lesion operatively. A series of novel methods of caries removal have been described; including chemomechanical caries removal, air abrasion, sono-abrasion, polymer rotary burs and lasers. There are also novel approaches to ensure complete caries removal and novel approaches for the management of deep caries. A novel question increasingly asked by clinicians is: does all the caries need to be removed? Operative management options here include: therapeutic fissure sealants, ultraconservative caries removal, stepwise excavation and the Hall technique. In conclusion, there is now a growing wealth of evidence that questions the traditional methods of caries removal and restoring the tooth. In parallel, there is a growing movement exploring the merits of therapeutically sealing caries into the tooth. This philosophy is alien to many of today's dentists and, until further randomized controlled trials are carried out in primary care, prudent caution must be exercised with this promising approach. Research is required into techniques which will allow monitoring of sealed caries to detect any rare, but insidious, failures. These novel techniques are an alternative way of managing the later stages of the caries process from a sounder biological basis and have marked potential benefits to patients from treatment, pain and outcome perspectives. Copyright 2009 S. Karger AG, Basel

  3. Surface inspection operator interface

    NASA Astrophysics Data System (ADS)

    Creek, Russell C.

    1992-03-01

    Surface inspection systems are widely used in many industries including steel, tin, aluminum, and paper. These systems generally use machine vision technology to detect defective surface regions and can generate very high data output rates which can be difficult for line operators to absorb and use. A graphical, windowing interface is described which provides the operators with an overview of the surface quality of the inspected web while still allowing them to select individual defective regions for display. A touch screen is used as the only operator input. This required alterations to some screen widgets due to subtle ergonomic differences of touch screen input over mouse input. The interface, although developed for inspecting coated steel, has been designed to be adaptable to other surface inspection applications. Facility is provided to allow the detection, classification, and display functions of the inspection system to be readily changed. Modifications can be implemented on two main levels; changes that reflect the configuration of the hardware system and control the detection and classification components of the surface inspection system are accessible only to authorized staff while those affecting the display and alarm settings of defect types may be changed by operators and this can generally be done dynamically.

  4. Training of Operative Employees

    ERIC Educational Resources Information Center

    Watson, John G.; Rowe, Clair D.

    1976-01-01

    A case study of the Devils Lake Manufacturing Corporation (a successful enterprise between the Brunswick Corporation and the Sioux Indians on the Fort Totten Indian Reservation) is discussed. It shows how the thorough training of operative employees in a minority enterprise has been a factor in the organization's success. (Author/BP)

  5. Variability as an Operant?

    ERIC Educational Resources Information Center

    Holth, Per

    2012-01-01

    A series of experiments on operant variability by Neuringer and colleagues (e.g., Neuringer, 1986, 2002; Page & Neuringer, 1985) have been repeatedly cited as showing that behavioral variability can be reinforced by making reinforcement contingent on it. They showed that the degree of variability in pigeons' eight-peck sequences, as measured by U…

  6. Operation C O P

    ERIC Educational Resources Information Center

    Mueck, Robert P.; Parker, Ashley

    2011-01-01

    Sometimes one never knows what sparks an idea or causes people to come together and take something forward. An example of this is Operation COP at the University of Maryland in College Park. Their version of the "See Something, Say Something" campaign is being touted as a crime prevention program, while it is at the same time an…

  7. Domestic Support Operations

    DTIC Science & Technology

    1993-07-01

    slingload of construction materials from Mount Rushmore . The ma- terial had been on the mountain since 1941. The 113th removed the materials during...through establishing listening posts and observation posts, on foot or mounted patrols, operation of ground surveillance or air defense radars, and the

  8. [Lateral epicondylitis: conservative - operative].

    PubMed

    Altintas, Burak; Greiner, Stefan

    2016-10-01

    Lateral epicondylitis is a common disease of the common extensor origin at the lateral humerus. Despite its common self-limitation it can lead to chronic therapy-resistant pain with remarkable functional disability of the affected arm. Different conservative and operative treatment options of lateral epicondylitis are described and compared regarding benefits and risks. Additionally, recent surgical techniques and their complications are mentioned. Based on the current literature, it is shown which treatment option can be recommended. This review was based on the literature analysis in PubMed regarding "conservative and operative therapy of lateral epicondylitis" as well as the clinical experience of the authors. Conservative treatment is the primary choice for the treatment of lateral epicondylitis if concomitant pathologies such as instability among others can be excluded. It should include strengthening against resistance with eccentric stretching of the extensor group. In persistent cases, operative treatment is warranted. Resection of the pathologic tissue at the extensor origin with debridement and refixation of the healthy tendinous tissue yields good results. Most patients with lateral epicondylitis can be treated conservatively with success. Radiological evaluation should be performed in therapy-resistant cases. In the case of partial or complete rupture of the extensor origin, operative therapy is indicated.

  9. Basic Water Treatment Operation.

    ERIC Educational Resources Information Center

    Ontario Ministry of the Environment, Toronto.

    This manual was developed for use at workshops designed to introduce the fundamentals of water treatment plant operations. The course consists of lecture-discussions and hands-on activities. Each of the fourteen lessons in this document has clearly stated behavioral objectives to tell the trainee what he should know or do after completing that…

  10. Concept of Operations: Essence

    SciTech Connect

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  11. Convenience Store Operations.

    ERIC Educational Resources Information Center

    Luter, Robert R.

    This self-paced, individualized instructional guide is designed for use by those who are currently working in a convenience store or by those who wish to learn the basics of convenience store marketing and operations. Addressed in the individual units of the guide are the following topics: today's convenience store, regular duties and…

  12. Fast Fuzzy Arithmetic Operations

    NASA Technical Reports Server (NTRS)

    Hampton, Michael; Kosheleva, Olga

    1997-01-01

    In engineering applications of fuzzy logic, the main goal is not to simulate the way the experts really think, but to come up with a good engineering solution that would (ideally) be better than the expert's control, In such applications, it makes perfect sense to restrict ourselves to simplified approximate expressions for membership functions. If we need to perform arithmetic operations with the resulting fuzzy numbers, then we can use simple and fast algorithms that are known for operations with simple membership functions. In other applications, especially the ones that are related to humanities, simulating experts is one of the main goals. In such applications, we must use membership functions that capture every nuance of the expert's opinion; these functions are therefore complicated, and fuzzy arithmetic operations with the corresponding fuzzy numbers become a computational problem. In this paper, we design a new algorithm for performing such operations. This algorithm is applicable in the case when negative logarithms - log(u(x)) of membership functions u(x) are convex, and reduces computation time from O(n(exp 2))to O(n log(n)) (where n is the number of points x at which we know the membership functions u(x)).

  13. Basic Water Treatment Operation.

    ERIC Educational Resources Information Center

    Ontario Ministry of the Environment, Toronto.

    This manual was developed for use at workshops designed to introduce the fundamentals of water treatment plant operations. The course consists of lecture-discussions and hands-on activities. Each of the fourteen lessons in this document has clearly stated behavioral objectives to tell the trainee what he should know or do after completing that…

  14. OPERATION ALPHABET, 1.

    ERIC Educational Resources Information Center

    COATES, ROBERT H., ED.

    OPERATION ALPHABET 1 IS THE FIRST OF A SERIES OF WORKBOOKS PLANNED TO HELP ADULTS LEARN TO READ AND WRITE. EACH OF THE 100 LESSONS DEVELOPS ONE IDEA OF INTEREST TO ADULTS, EMPHASIZING KEY WORDS AND PRACTICE WRITING EXERCISES. WORDS USED IN THE LESSONS ARE DEFINED AT THE END OF THE BOOK. THIS DOCUMENT IS AVAILABLE FROM NOBLE AND NOBLE, PUBLISHERS,…

  15. Convenience Store Operations.

    ERIC Educational Resources Information Center

    Luter, Robert R.

    This self-paced, individualized instructional guide is designed for use by those who are currently working in a convenience store or by those who wish to learn the basics of convenience store marketing and operations. Addressed in the individual units of the guide are the following topics: today's convenience store, regular duties and…

  16. Operational Energy Considerations

    DTIC Science & Technology

    2010-06-14

    bolt launched from an eggshell , invisibly tethered to a base” I n t e g r i t y - S e r v i c e - E x c e l l e n c e War Games Affirm Operational...Highly Efficient Embedded Turbine Engine, Adaptive Versatile Engine Technology  Design: Blended Wing Body  Materials: Composites , morphing structures

  17. Operation Stay in School.

    ERIC Educational Resources Information Center

    Superintendent's Communicator, 1982

    1982-01-01

    THE FOLLOWING IS THE FULL TEXT OF THIS DOCUMENT: Operation Stay In School is a program that focuses the combined efforts of parents, law enforcement personnel, probation officers, and school district staff on improving school attendance. Under the leadership of Judge Dennis Adams, following extensive study of effective truancy programs throughout…

  18. Operant Conditioning - Token Economy.

    ERIC Educational Resources Information Center

    Montgomery, Jacqueline; McBurney, Raymond D.

    Described is an Operant Conditioning-Token Economy Program, teaching patients to be responsible for their own behavior, to make choices, and to be motivated to change. The program was instigated with mentally ill patients in a state hospital and was later used with institutionalized mentally handicapped groups. After two years, only four of the…

  19. Teachers and Operant Conditioning.

    ERIC Educational Resources Information Center

    Frey, Sherman

    A survey was conducted of 406 elementary, middle, and secondary school teachers to determine their understanding, acceptance, and use of the principle of operant conditioning. The treatment of data was by percent and chi square analysis primarily according to sex, experience, degree, and position. Subjects reported that a) they believed that the…

  20. DSMS science operations concept

    NASA Technical Reports Server (NTRS)

    Connally, M. J.; Kuiper, T. B.

    2001-01-01

    The Deep Space Mission System (DSMS) Science Operations Concept describes the vision for enabling the use of the DSMS, particularly the Deep Space Network (DSN) for direct science observations in the areas of radio astronomy, planetary radar, radio science and VLBI.

  1. Camera Operator and Videographer

    ERIC Educational Resources Information Center

    Moore, Pam

    2007-01-01

    Television, video, and motion picture camera operators produce images that tell a story, inform or entertain an audience, or record an event. They use various cameras to shoot a wide range of material, including television series, news and sporting events, music videos, motion pictures, documentaries, and training sessions. Those who film or…

  2. BEVALAC operation's update

    SciTech Connect

    Not Available

    1986-01-01

    Information is given on the operation and improvement of the BEVALAC, and about some of the supporting facilities, such as the electronics pool and a living/working facility at the accelerator. The status is given of an upgraded local injector, five individual beam lines, and the Plastic Ball Detector. (LEW)

  3. Operant Conditioning - Token Economy.

    ERIC Educational Resources Information Center

    Montgomery, Jacqueline; McBurney, Raymond D.

    Described is an Operant Conditioning-Token Economy Program, teaching patients to be responsible for their own behavior, to make choices, and to be motivated to change. The program was instigated with mentally ill patients in a state hospital and was later used with institutionalized mentally handicapped groups. After two years, only four of the…

  4. DSMS science operations concept

    NASA Technical Reports Server (NTRS)

    Connally, M. J.; Kuiper, T. B.

    2001-01-01

    The Deep Space Mission System (DSMS) Science Operations Concept describes the vision for enabling the use of the DSMS, particularly the Deep Space Network (DSN) for direct science observations in the areas of radio astronomy, planetary radar, radio science and VLBI.

  5. Manually operated coded switch

    DOEpatents

    Barnette, Jon H.

    1978-01-01

    The disclosure relates to a manually operated recodable coded switch in which a code may be inserted, tried and used to actuate a lever controlling an external device. After attempting a code, the switch's code wheels must be returned to their zero positions before another try is made.

  6. Beyond an Operational Reserve

    DTIC Science & Technology

    2013-05-01

    equipment, electronics and wheeled vehicles, as well as personnel shortages in critical specialty areas such as doctors and nurses . The report concluded... intervention in Korea. The President’s declaration called for additional military forces, including four ARNG divisions, to provide a deterrence to...regional conflicts, the new strategy emphasizes the need for strong capabilities to conduct smaller scale intervention operations like peace

  7. Camera Operator and Videographer

    ERIC Educational Resources Information Center

    Moore, Pam

    2007-01-01

    Television, video, and motion picture camera operators produce images that tell a story, inform or entertain an audience, or record an event. They use various cameras to shoot a wide range of material, including television series, news and sporting events, music videos, motion pictures, documentaries, and training sessions. Those who film or…

  8. Space Operations Learning Center

    NASA Technical Reports Server (NTRS)

    Lui, Ben; Milner, Barbara; Binebrink, Dan; Kuok, Heng

    2012-01-01

    The Space Operations Learning Center (SOLC) is a tool that provides an online learning environment where students can learn science, technology, engineering, and mathematics (STEM) through a series of training modules. SOLC is also an effective media for NASA to showcase its contributions to the general public. SOLC is a Web-based environment with a learning platform for students to understand STEM through interactive modules in various engineering topics. SOLC is unique in its approach to develop learning materials to teach schoolaged students the basic concepts of space operations. SOLC utilizes the latest Web and software technologies to present this educational content in a fun and engaging way for all grade levels. SOLC uses animations, streaming video, cartoon characters, audio narration, interactive games and more to deliver educational concepts. The Web portal organizes all of these training modules in an easily accessible way for visitors worldwide. SOLC provides multiple training modules on various topics. At the time of this reporting, seven modules have been developed: Space Communication, Flight Dynamics, Information Processing, Mission Operations, Kids Zone 1, Kids Zone 2, and Save The Forest. For the first four modules, each contains three components: Flight Training, Flight License, and Fly It! Kids Zone 1 and 2 include a number of educational videos and games designed specifically for grades K-6. Save The Forest is a space operations mission with four simulations and activities to complete, optimized for new touch screen technology. The Kids Zone 1 module has recently been ported to Facebook to attract wider audience.

  9. Mission operations management

    NASA Technical Reports Server (NTRS)

    Rocco, David A.

    1994-01-01

    Redefining the approach and philosophy that operations management uses to define, develop, and implement space missions will be a central element in achieving high efficiency mission operations for the future. The goal of a cost effective space operations program cannot be realized if the attitudes and methodologies we currently employ to plan, develop, and manage space missions do not change. A management philosophy that is in synch with the environment in terms of budget, technology, and science objectives must be developed. Changing our basic perception of mission operations will require a shift in the way we view the mission. This requires a transition from current practices of viewing the mission as a unique end product, to a 'mission development concept' built on the visualization of the end-to-end mission. To achieve this change we must define realistic mission success criteria and develop pragmatic approaches to achieve our goals. Custom mission development for all but the largest and most unique programs is not practical in the current budget environment, and we simply do not have the resources to implement all of our planned science programs. We need to shift our management focus to allow us the opportunity make use of methodologies and approaches which are based on common building blocks that can be utilized in the space, ground, and mission unique segments of all missions.

  10. Variability as an Operant?

    ERIC Educational Resources Information Center

    Holth, Per

    2012-01-01

    A series of experiments on operant variability by Neuringer and colleagues (e.g., Neuringer, 1986, 2002; Page & Neuringer, 1985) have been repeatedly cited as showing that behavioral variability can be reinforced by making reinforcement contingent on it. They showed that the degree of variability in pigeons' eight-peck sequences, as measured by U…

  11. EVA-SCRAM operations

    NASA Technical Reports Server (NTRS)

    Flanigan, Lee A.; Tamir, David; Weeks, Jack L.; Mcclure, Sidney R.; Kimbrough, Andrew G.

    1994-01-01

    This paper wrestles with the on-orbit operational challenges introduced by the proposed Space Construction, Repair, and Maintenance (SCRAM) tool kit for Extra-Vehicular Activity (EVA). SCRAM undertakes a new challenging series of on-orbit tasks in support of the near-term Hubble Space Telescope, Extended Duration Orbiter, Long Duration Orbiter, Space Station Freedom, other orbital platforms, and even the future manned Lunar/Mars missions. These new EVA tasks involve welding, brazing, cutting, coating, heat-treating, and cleaning operations. Anticipated near-term EVA-SCRAM applications include construction of fluid lines and structural members, repair of punctures by orbital debris, refurbishment of surfaces eroded by atomic oxygen, and cleaning of optical, solar panel, and high emissivity radiator surfaces which have been degraded by contaminants. Future EVA-SCRAM applications are also examined, involving mass production tasks automated with robotics and artificial intelligence, for construction of large truss, aerobrake, and reactor shadow shield structures. Realistically achieving EVA-SCRAM is examined by addressing manual, teleoperated, semi-automated, and fully-automated operation modes. The operational challenges posed by EVA-SCRAM tasks are reviewed with respect to capabilities of existing and upcoming EVA systems, such as the Extravehicular Mobility Unit, the Shuttle Remote Manipulating System, the Dexterous End Effector, and the Servicing Aid Tool.

  12. Intelligent Potroom Operation

    SciTech Connect

    Jan Berkow; Larry Banta

    2003-07-29

    The Intelligent Potroom Operation project focuses on maximizing the performance of an aluminum smelter by innovating components for an intelligent manufacturing system. The Intelligent Potroom Advisor (IPA) monitors process data to identify reduction cells exhibiting behaviors that require immediate attention. It then advises operational personnel on those heuristic-based actions to bring the cell back to an optimal operating state in order to reduce the duration and frequency of substandard reduction cell performance referred to as ''Off-Peak Modes'' (OPMs). Techniques developed to identify cells exhibiting OPMs include the use of a finite element model-based cell state estimator for defining the cell's current operating state via advanced cell noise analyses. In addition, rule induction was also employed to identify statistically significant complex behaviors that occur prior to OPMs. The intelligent manufacturing system design, concepts and formalisms developed in this project w ere used as a basis for an intelligent manufacturing system design. Future research will incorporate an adaptive component to automate continuous process improvement, a technology platform with the potential to improve process performance in many of the other Industries of the Future applications as well.

  13. 100 area excavation treatability test plan

    SciTech Connect

    Not Available

    1993-05-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.

  14. Reactor Operations Management Plan

    SciTech Connect

    Rice, P.D.

    1991-12-05

    The K-Reactor last operated in April 1988. At that time, K-Reactor was one of three operating reactors at the Savannah River Site (SRS). Following an incident in P-Reactor in August 1988, it was decided to discontinue SRS reactor operation and conduct an extensive program to upgrade operating practices and plant hardware prior to restart of any of the reactors. The K-reactor was the first of three reactors scheduled to resume production. At the present time, it is the only reactor with planned restart. WSRC assumed management of SRS on April 1, 1989. WSRC established the Safety Basis for Restart and a listing of the actions planned to satisfy the Safety Basis. In consultation with DOE, it was determined that proper management of the restart activities would require a single plan that integrated the numerous activities. The plan was entitled the Reactor Operations Management Plan and is referred to simply as the ROMP. The initial version of ROMP was produced in July of 1989. Subsequent modifications led to Revision 3 which was approved by DOE in May, 1990. Other changes were made in a formal change process, resulting in the latest version, Revision 5, being issued in October, 1990. The ROMP contains three key parts: first, the Restart Safety Basis; second, a description of the process for addressing new technical issues and a listing of the established workscope and the associated acceptance criteria; and three, a schedule for executing the work. I will discuss the first two areas, along with the closure process used to assure the intent of ROMP was met. The ROMP activities are all complete and I will not discuss schedule further.

  15. Satellite Operations in Alaska

    NASA Astrophysics Data System (ADS)

    Kreller, M. A.

    2016-12-01

    Numerous observational challenges exist across Alaska impacting National Weather Service (NWS) forecast operations and providing decision support services (DSS) to critical core partners and customers. These observational challenges range from limited utility of GOES imagery at higher latitudes, scarcity of observing platforms, to limited radar coverage. Although we are fortunate to receive these valuable and limited data sets, there still remain extensive spatial and temporal data gaps across Alaska. Many forecast challenges in Alaska are similar to those in the CONUS with the detection and monitoring of wildfire conditions, severe thunderstorms, river flooding, and coastal flooding, etc. There are additional unique DSS provided in Alaska including sea ice forecasting, ivu (ice shoves onshore), coastal erosion due to permafrost melt, and extreme hazardous winter conditions (temperatures as low as -80F). In addition to the observational and forecast challenges, the sheer size of the area of responsibility in Alaska is a challenge. NWS operations have always heavily relied on satellite imagery to quickly assess the current weather situation and provide forecast guidance. NWS operations have established several partnerships with the satellite community to help with these challenges. In particular the GOES-R and Joint Polar Satellite System (JPSS) OCONUS Satellite Proving Ground (PG) Programs have not only improved Alaska's observational challenges, but continue to identify new capabilities with the next generation geostationary and polar-orbiting satellite products.. For example, River ice and flood detection products derived from the Suomi-NPP VIIRS satellite imagery with the support of the JPSS Proving Ground and Risk Reduction Program. This presentation will provide examples of how new satellite capabilities are being used in NWS Alaska forecast operations to support DSS, with emphasis on JPSS satellite products. Future satellite utilization or operational needs

  16. On the Neuberger overlap operator

    NASA Astrophysics Data System (ADS)

    Boriçi, Artan

    1999-04-01

    We compute Neuberger's overlap operator by the Lanczos algorithm applied to the Wilson-Dirac operator. Locality of the operator for quenched QCD data and its eigenvalue spectrum in an instanton background are studied.

  17. Small satellite space operations

    NASA Technical Reports Server (NTRS)

    Reiss, Keith

    1994-01-01

    CTA Space Systems has played a premier role in the development of the 'lightsat' programs of the 80's and 90's. The high costs and development times associated with conventional LEO satellite design, fabrication, launch, and operations continue to motivate the development of new methodologies, techniques, and generally low cost and less stringently regulated satellites. These spacecraft employ low power 'lightsat' communications (versus TDRSS for NASA's LEO's) and typically fly missions with payload/experiment suites that can succeed, for example, without heavily redundant backup systems and large infrastructures of personnel and ground support systems. Such small yet adaptable satellites are also typified by their very short contract-to-launch times (often one to two years). This paper reflects several of the methodologies and perspectives of our successful involvement in these innovative programs and suggests how they might relieve NASA's mounting pressures to reduce the cost of both the spacecraft and their companion mission operations. It focuses on the use of adaptable, sufficiently powerful yet inexpensive PC-based ground systems for wide ranging user terminal (UT) applications and master control facilities for mission operations. These systems proved themselves in successfully controlling more than two dozen USAF, USN, and ARPA satellites at CTA/SS. UT versions have linked with both GEO and LEO satellites and functioned autonomously in relay roles often in remote parts of the world. LEO applications particularly illustrate the efficacy of these concepts since a user can easily mount a lightweight antenna, usually an omni or helix with light duty rotors and PC-based drivers. A few feet of coax connected to a small transceiver module (the size of a small PC) and a serial line to an associated PC establishes a communications link and together with the PC constitute a viable ground station. Applications included geomagnetic mapping; spaceborne solid state

  18. Invertible linear ordinary differential operators

    NASA Astrophysics Data System (ADS)

    Chetverikov, Vladimir N.

    2017-03-01

    We consider invertible linear ordinary differential operators whose inversions are also differential operators. To each such operator we assign a numerical table. These tables are described in the elementary geometrical language. The table does not uniquely determine the operator. To define this operator uniquely some additional information should be added, as it is described in detail in this paper. The possibility of generalization of these results to partial differential operators is also discussed.

  19. White Cliffs: Operating Experience

    NASA Technical Reports Server (NTRS)

    Kaneff, S.

    1984-01-01

    The fourteen dish white cliffs solar power station area is remote and subject to extreme environmental conditions, solution of the associated problems required careful and thoughtful attention and the application of resources. Notwithstanding the wide range and harshness of conditions, the difficulties caused by remoteness and the lack of a technological base and the need for relatively rapid demonstration of success, the project has had a very positive outcome. Qualitative and quantitative information and lessons are now available to enable considerable simplifications to be made for a new system, reducing both hardware and operation and maintenance costs. Experience and lessons are presented, particularly in relation to: system performance in various environmental conditions; design philosophies for collectors, the array, control systems, engine and plant; operation and maintenance strategies and cost reducing possibilities. Experience so far gives encouragement for the future of such paraboloidal dish systems in appropriate areas.

  20. Pipework design and operation

    SciTech Connect

    Not Available

    1985-01-01

    This book presents the proceedings of a conference dedicated to the design and operation of pipework in all its aspects, involving both metallic and non-metallic materials. Topics considered include a study of single mitre pipe bends using the finite element method; tests to failure of GRP pipe bends under in-plane flexural loading; finite element stress analysis of an equal diameter branch pipe intersection subjected to internal pressure and in-plane moment loadings; finite element stress analysis of extruded outlet tee junctions; design of pipework on the British PWR; a review of advanced remanent life methods for pipes operating in the creep range; pipe whip analysis and design; damping values for piping systems; pipework snubbers based on electro-rheological fluids; and the seismic design of piping systems in the flexible range.

  1. Airline Operations Aid

    NASA Technical Reports Server (NTRS)

    1993-01-01

    C Language Integrated Production System (CLIPS), a NASA-developed expert systems program, is used by American Airlines for three purposes: as a rapid prototyping tool; to develop production prototypes; and to develop production application. An example of the latter is CLIPS' use in "Hub S1AAshing," a knowledge based system that recommends contingency plans when severe schedule reductions must be made. Hub S1AAshing has replaced a manual, labor intensive process. It saves time and allows Operations Control Coordinators to handle more difficult situations. Because the system assimilates much of the information necessary to facilitate educated decision making, it minimizes negative impact in situations where it is impossible to operate all flights.

  2. International Peacekeeping Operations

    PubMed Central

    2017-01-01

    This article takes stock of some of the important contributions to the study of peacekeeping (PK). Two key topics stand out: peacekeeping burden sharing and mission effectiveness. For burden sharing, the theoretical foundation is the private provision of public goods and joint products. Implications for burden sharing differ whether financial or troop contributions are being shared, with the latter driven by jointly produced country-specific benefits. Financial burden sharing can also differ between United Nations (UN)-led and non-UN-led peacekeeping operations, wherein country-specific benefits are especially important for the latter. Many articles gauge peacekeeping effectiveness by the mission’s ability to maintain the peace or to protect lives for a set time period. More recently, multiple criteria are raised for evaluating peacekeeping in today’s world of multifaceted peacebuilding operations.

  3. THERMALLY OPERATED VAPOR VALVE

    DOEpatents

    Dorward, J.G. Jr.

    1959-02-10

    A valve is presented for use in a calutron to supply and control the vapor to be ionized. The invention provides a means readily operable from the exterior of the vacuum tank of the apparatuss without mechanical transmission of forces for the quick and accurate control of the ionizing arc by a corresponding control of gas flow theretos thereby producing an effective way of carefully regulating the operation of the calutron. The invention consists essentially of a tube member extending into the charge bottle of a calutron devices having a poppet type valve closing the lower end of the tube. An electrical heating means is provided in the valve stem to thermally vary the length of the stem to regulate the valve opening to control the flow of material from the charge bottle.

  4. Hurricane slams gulf operations

    SciTech Connect

    Not Available

    1992-09-07

    This paper reports that reports of damage by Hurricane Andrew escalated last week as operators stepped up inspections of oil and gas installations in the Gulf of Mexico. By midweek, companies operating in the gulf and South Louisiana were beginning to agree that earlier assessments of damage only scratched the surface. Damage reports included scores of lost, toppled, or crippled platforms, pipeline ruptures, and oil slicks. By midweek the U.S. coast Guard had received reports of 79 oil spills. Even platforms capable of resuming production in some instances were begin curtailed because of damaged pipelines. Offshore service companies the another 2-4 weeks could be needed to fully assess Andrew's wrath. Lack of personnel and equipment was slowing damage assessment and repair.

  5. Benchmarking in Foodservice Operations.

    DTIC Science & Technology

    2007-11-02

    Food Management presented on April 9. 1998. Title: Benchmarking in Foodservice Operations. Abstract approved: M. Jean Chambers The objective of...would like to acknowledge and express my appreciation to my major professor, Dr. Jean Chambers , for her continual dedication, professional expertise...States Air Force. She, along with Dr. Chambers and Colonel Esther Myers, provided support from the beginning and throughout my educational journey. I am

  6. Operation Brain Trauma Therapy

    DTIC Science & Technology

    2011-10-01

    cyclosporin A on susceptibility to pilocarpine-induced seizures in rats with brain injured at different developmental stages. Epilepsy Res. 2004;61:63...Traumatic brain injury (TBI) is a leading cause of morbid-ity and mortality in Operation Iraqi Freedom largely due to the emergence of blast-injury from...initiate seizure activity than another promising calcineurin antagonist cyclosporine A28—which is currently in clinical trials for TBI. However, unlike

  7. 2015 Special Operations Essays

    DTIC Science & Technology

    2015-05-01

    Intelligence Agency Relationship since Desert Storm and its Prospects for the Future , May 2014, David P. Oakley Countering the al-Shabaab Insurgency...benefit the reader professionally and encourage future PME students to enter the contest for 2016. Feedback is welcome, and your suggestions will...be incorporated into future JSOU reports. Kenneth H. Poole, Ed.D. Director, Center for Special Operations Studies and Research 1 Ruszkiewicz

  8. Launch Vehicle Operations Simulator

    NASA Technical Reports Server (NTRS)

    Blackledge, J. W.

    1974-01-01

    The Saturn Launch Vehicle Operations Simulator (LVOS) was developed for NASA at Kennedy Space Center. LVOS simulates the Saturn launch vehicle and its ground support equipment. The simulator was intended primarily to be used as a launch crew trainer but it is also being used for test procedure and software validation. A NASA/contractor team of engineers and programmers implemented the simulator after the Apollo XI lunar landing during the low activity periods between launches.

  9. Operation Stalemate II

    DTIC Science & Technology

    2004-06-18

    supply ship northwest of Truk in the Carolines. 6. 21 January 1944 – US submarine Seahorse (SS-304) attacked a Japanese convoy sinking a Japanese...1944 – US submarine Seahorse (SS-304) attacked a Japanese convoy sinking a Japanese army cargo ship southeast of Palau. 55 10. 31 January 1944 – US...Palau Islands in the Pacific Ocean. The primary purpose of this operation was to prevent the Japanese from attacking MacArthur’s western flank while he

  10. Operation Urgent Fury - Grenada

    DTIC Science & Technology

    1983-11-01

    Organization Name(s) and Address(es) Joint History Office Office of the Chairman of the Joint Chiefs of Staff Washington, DC Performing Organization Report...FURY The Planning and Execution of Joint Operations in Grenada 12 October - 2 November 1983 Ronald H. Cole Joint History Office Office of the Chairman...Includes index. 1. Grenada-- History --American Invasion, 1983. 2. Military planning--United States. 3. United States--Armed Forces

  11. Gaussian operations and privacy

    SciTech Connect

    Navascues, Miguel; Acin, Antonio

    2005-07-15

    We consider the possibilities offered by Gaussian states and operations for two honest parties, Alice and Bob, to obtain privacy against a third eavesdropping party, Eve. We first extend the security analysis of the protocol proposed in [Navascues et al. Phys. Rev. Lett. 94, 010502 (2005)]. Then, we prove that a generalized version of this protocol does not allow one to distill a secret key out of bound entangled Gaussian states.

  12. Operation of the accelerator

    SciTech Connect

    Pardo, R.C.; Batzka, B.; Billquist, P.J.

    1995-08-01

    Fiscal Year 1994 was the first year of seven-day operation since ATLAS became a national user facility in 1985. ATLAS made the most of the opportunity this year by providing 5200 hours of beam on-target to the research program. A record number of 60 experiments were completed and the {open_quotes}facility reliability{close_quotes} remained near the 90% level. Seven-day operation was made possible with the addition to the staff of two operator positions providing single-operator coverage during the weekend period. The normally scheduled coverage was augmented by an on-call list of system experts who respond to emergencies with phone-in advice and return to the Laboratory when necessary. This staffing approach continues but we rearranged our staffing patterns so that we now have one cryogenics engineer working a shift pattern which includes 8-hour daily coverage during the weekend. ATLAS provided a beam mix to users consisting of 26 different isotopic species, 23% of which were for A>100 in FY 1994. Approximately 60% of the beam time was provided by the Positive Ion Injector, slightly less than the usage rate of FY 1993. Experiments using uranium or lead beams accounted for 16.4% of the total beam time. The ECR ion source and high-voltage platform functioned well throughout the year. A new technique for solid material production in the source was developed which uses a sputtering process wherein the sample of material placed near the plasma chamber wall is biased negatively. Plasma ions are accelerated into the sample and material is sputtered from the surface into the plasma. This technique is now used routinely for many elements. Runs of calcium, germanium, nickel, lead, tellurium, and uranium were carried out with this technique.

  13. ABCs of Operational Resilience

    DTIC Science & Technology

    2014-01-23

    Services Tactical InfoSec Services “Provides, operates, and assures command and control, information sharing capabilities, and a globally accessible...factories he highlighting the fragility and resilience of the aerospace giant’s global su it works to sharply increase production . The star slate...kers bakes The explosion at a German chemicals plant two weeks ago which kille By JEFF BE nd JA HROt1 KO two workers, has thrown the global car

  14. FIM Avionics Operations Manual

    NASA Technical Reports Server (NTRS)

    Alves, Erin E.

    2017-01-01

    This document describes the operation and use of the Flight Interval Management (FIM) Application installed on an electronic flight bag (EFB). Specifically, this document includes: 1) screen layouts for each page of the interface; 2) step-by-step instructions for data entry, data verification, and input error correction; 3) algorithm state messages and error condition alerting messages; 4) aircraft speed guidance and deviation indications; and 5) graphical display of the spatial relationships between the Ownship aircraft and the Target aircraft.

  15. Operational Collision Avoidance

    NASA Technical Reports Server (NTRS)

    Guit, Bill

    2015-01-01

    This presentation will describe the early days of the EOS Aqua and Aura operational collision avoidance process. It will highlight EOS debris avoidance maneuvers, EOS high interest event statistic and A-Train systematic conjunctions and conclude with future challenges. This is related to earlier e-DAA (tracking number 21692) that an abstract was submitted to a different conference. Eric Moyer, ESMO Deputy Project Manager has reviewed and approved this presentation on May 6, 2015

  16. Operation HARDTACK 1, 1958

    DTIC Science & Technology

    1982-12-01

    Yurechko 19. KEY WORKS. (Continued) HOLLY, NUTMEG , YELLOWWOOD, MAGNOLIA, TOBACCO, SYCAMvORE, ROSE, MAPLE, ASPEN, *WALNUT, LINDEN, REDWOOD, ELDER, OAK...Enewetak Barge 13 May KOAb Enewetak Surface 16 May WAHOO Enewetak, in ocean Underwater 21 May HOLLY Enewetak Barge 22 May NUTMEG Bikini Barge S26 May...149 Bikini Weapon Development Test Operations 149 Test Sites 150 Evacuation 150 Reentry and Recovery 151 The Bikini Shots 151 FIR 154 NUTMEG 158

  17. Synchronizing Sustainment Operations

    DTIC Science & Technology

    2008-04-10

    sustaining units provide support to receiving units. Materiel readiness and management are control measures that ensure the provision of supply and...SBs provide sustainment on an area basis and are assigned to or operationally controlled by the TSCs. SBs can organize into theater opening...materiel management control points found within the corps and theater AOE logistics system. Structural changes began to streamline sustainment

  18. Model for refining operations

    NASA Technical Reports Server (NTRS)

    Dunbar, D. N.; Tunnah, B. G.

    1979-01-01

    Program predicts production volumes of petroleum refinery products, with particular emphasis on aircraft-turbine fuel blends and their key properties. It calculates capital and operating costs for refinery and its margin of profitability. Program also includes provisions for processing of synthetic crude oils from oil shale and coal liquefaction processes and contains highly-detailed blending computations for alternative jet-fuel blends of varying endpoint specifications.

  19. Explicit Fourier wavefield operators

    NASA Astrophysics Data System (ADS)

    Ferguson, R. J.; Margrave, G. F.

    2006-04-01

    Explicit wavefield extrapolators are based on direct analytic mathematical formulae that express the output as an extrapolation operator acting on the input, while implicit methods usually require the calculation of the numerical inverse of a matrix to obtain the output. Typically, explicit methods are faster than implicit methods, and they often give more insight into the physics of the wave propagation, but they often suffer from instability. Four different explicit extrapolators based on Fourier theory are presented and analysed. They are: PS (ordinary phase shift), GPSPI (generalized phase shift plus interpolation), NSPS (non-stationary phase shift) and SNPS (symmetric non-stationary phase shift). A formal proof is given that NSPS in a direction orthogonal to the velocity gradient is the mathematical adjoint process to GPSPI in the opposite direction. This motivates the construction of SNPS that combines NSPS and GPSPI in a symmetric fashion. This symmetry (under interchange of input and output lateral coordinates) is required by reciprocity arguments. PS and SNPS are symmetric while NSPS and GPSPI are not. A numerical stability study using SVD (singular value decomposition) shows that all of these extrapolators can become unstable for strong lateral velocity gradients. Unstable operators allow amplitudes to grow non-physically in a recursion. Stability is enhanced by introducing a small (~3 per cent) imaginary component to the velocities. This causes a numerical attenuation that tends to stabilize the operators but does not address the cause of the instability. For the velocity model studied (a very challenging case) GPSPI and NSPS have exactly the same instability while SNPS is always more stable. Instability manifests in a complicated way as a function of extrapolation step size, frequency, velocity gradient, and strength of numerical attenuation. The SNPS operator can be stabilized over a wide range of conditions with considerably less attenuation than is

  20. Datacomputer and SIP Operations

    DTIC Science & Technology

    1979-03-30

    decline in Figure 2.^ 4 represents the deletion of the old daily files after the new version of the application was operational. Among the new ...Version 5 The Version 5 Datacomputer was put into service early in 1978 replacing the Version 4 Datacomputer. There were two new features of...34interesting" .^ lanet data and are described in Section 4 above. The changes that actually occurred during 1978 were a cessation of real time short