33 CFR 211.7 - Rights which may be granted by Division and District Engineers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WITH CIVIL WORKS PROJECTS Temporary Use by Others of Civil Works Real Estate § 211.7 Rights which may.... Division Engineers, the President of the Mississippi River Commission, and District Engineers of districts... of the Mississippi River Commission in granting leases and District Engineers will administer the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1970-03-01
The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less
Habersack, Helmut; Hein, Thomas; Stanica, Adrian; Liska, Igor; Mair, Raimund; Jäger, Elisabeth; Hauer, Christoph; Bradley, Chris
2016-02-01
In the Danube River Basin multiple pressures affect the river system as a consequence of river engineering works, altering both the river hydrodynamics and morphodynamics. The main objective of this paper is to identify the effects of hydropower development, flood protection and engineering works for navigation on the Danube and to examine specific impacts of these developments on sediment transport and river morphology. Whereas impoundments are characterised by deposition and an excess of sediment with remobilisation of fine sediments during severe floods, the remaining five free flowing sections of the Danube are experiencing river bed erosion of the order of several centimetres per year. Besides the effect of interruption of the sediment continuum, river bed degradation is caused by an increase in the sediment transport capacity following an increase in slope, a reduction of river bed width due to canalisation, prohibition of bank erosion by riprap or regressive erosion following base level lowering by flood protection measures and sediment dredging. As a consequence, the groundwater table is lowered, side-arms are disconnected, instream structures are lost and habitat quality deteriorates affecting the ecological status of valuable floodplains. The lack of sediments, together with cutting off meanders, leads also to erosion of the bed of main arms in the Danube Delta and coastal erosion. This paper details the causes and effects of river engineering measures and hydromorphological changes for the Danube. It highlights the importance of adopting a basin-wide holistic approach to river management and demonstrates that past management in the basin has been characterised by a lack of integration. To-date insufficient attention has been paid to the wide-ranging impacts of river engineering works throughout the basin: from the basin headwaters to the Danube Delta, on the Black Sea coast. This highlights the importance of new initiatives that seek to advance knowledge exchange and knowledge transfer within the basin to reach the goal of integrated basin management. Copyright © 2015 Elsevier B.V. All rights reserved.
Columbia River System Analysis Model - Phase 1
1991-10-01
Reach reservoirs due to the impact of APPENDIX D 6 Wenatchee River flows and additional inflow downstream of Rocky Reach. An inflow link terminates at...AD-A246 639I 11 11111 till11 1 111 US Army Corps of Engineers Hydrologic Engineering Center Columbia River System Analysis Model - Phase I Libby...WORK UNIT ELEMENT NO. NO. NO. ACCESSION NO. 11. TITLE (Include Security Classification) Columbia River System Analysis - Phase I 12. PERSONAL AUTHOR(S
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 27, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view of work area, looking downstream - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Additional challenges for uncertainty analysis in river engineering
NASA Astrophysics Data System (ADS)
Berends, Koen; Warmink, Jord; Hulscher, Suzanne
2016-04-01
The management of rivers for improving safety, shipping and environment requires conscious effort on the part of river managers. River engineers design hydraulic works to tackle various challenges, from increasing flow conveyance to ensuring minimal water depths for environmental flow and inland shipping. Last year saw the completion of such large scale river engineering in the 'Room for the River' programme for the Dutch Rhine River system, in which several dozen of human interventions were built to increase flood safety. Engineering works in rivers are not completed in isolation from society. Rather, their benefits - increased safety, landscaping beauty - and their disadvantages - expropriation, hindrance - directly affect inhabitants. Therefore river managers are required to carefully defend their plans. The effect of engineering works on river dynamics is being evaluated using hydraulic river models. Two-dimensional numerical models based on the shallow water equations provide the predictions necessary to make decisions on designs and future plans. However, like all environmental models, these predictions are subject to uncertainty. In recent years progress has been made in the identification of the main sources of uncertainty for hydraulic river models. Two of the most important sources are boundary conditions and hydraulic roughness (Warmink et al. 2013). The result of these sources of uncertainty is that the identification of single, deterministic prediction model is a non-trivial task. This is this is a well-understood problem in other fields as well - most notably hydrology - and known as equifinality. However, the particular case of human intervention modelling with hydraulic river models compounds the equifinality case. The model that provides the reference baseline situation is usually identified through calibration and afterwards modified for the engineering intervention. This results in two distinct models, the evaluation of which yields the effect of the proposed intervention. The implicit assumption underlying such analysis is that both models are commensurable. We hypothesize that they are commensurable only to a certain extent. In an idealised study we have demonstrated that prediction performance loss should be expected with increasingly large engineering works. When accounting for parametric uncertainty of floodplain roughness in model identification, we see uncertainty bounds for predicted effects of interventions increase with increasing intervention scale. Calibration of these types of models therefore seems to have a shelf-life, beyond which calibration does not longer improves prediction. Therefore a qualification scheme for model use is required that can be linked to model validity. In this study, we characterize model use along three dimensions: extrapolation (using the model with different external drivers), extension (using the model for different output or indicators) and modification (using modified models). Such use of models is expected to have implications for the applicability of surrogating modelling for efficient uncertainty analysis as well, which is recommended for future research. Warmink, J. J.; Straatsma, M. W.; Huthoff, F.; Booij, M. J. & Hulscher, S. J. M. H. 2013. Uncertainty of design water levels due to combined bed form and vegetation roughness in the Dutch river Waal. Journal of Flood Risk Management 6, 302-318 . DOI: 10.1111/jfr3.12014
DeLonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Annis, Mandy L.; Braaten, P. J.; Elliott, Caroline M.; Fuller, D. B.; Haas, Justin D.; Haddix, Tyler M.; Ladd, Hallie L.A.; McElroy, Brandon J.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wildhaber, Mark L.
2014-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2011 scope of work emphasized understanding of reproductive migrations and spawning of adult sturgeon, and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and including downstream reaches of the Milk River, and the Lower Yellowstone River. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2011.
Delonay, Aaron J.; Chojnacki, Kimberly A.; Jacobson, Robert B.; Braaten, Patrick J.; Buhl, Kevin J.; Elliott, Caroline M.; Erwin, Susannah O.; Faulkner, Jacob D.A.; Candrl, James S.; Fuller, David B.; Backes, Kenneth M.; Haddix, Tyler M.; Rugg, Matthew L.; Wesolek, Christopher J.; Eder, Brandon L.; Mestl, Gerald E.
2016-03-16
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with collaborating research partners and in cooperation with the U.S. Army Corps of Engineers, Missouri River Recovery Program–Integrated Science Program. The project research consists of several interdependent and complementary tasks that involve multiple disciplines.The project research tasks in the 2014 scope of work emphasized understanding of reproductive migrations and spawning of adult pallid sturgeon and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and downstream reaches of the Milk River, and the Lower Yellowstone River. The project research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2014.
1981-12-01
Creek, Russian River Basin, Sonoma County , California; Hydraulic Model Investigation," Technical Report H-73-3, U. S. Army Engineer Waterways Experiment...Springs Dam, Dry Creek, Russian River Basin, Sonoma County , Cali- fornia; Hydraulic Model Investigation," Technical Report H-73-3, U. S. Army Engineer...Structures Ables, J. H., Jr., and Pickering, G. A. 1973 (Feb). "Outlet Works, 0 Warm Springs Dam, Dry Creek, Russian River Basin, Sonoma County , Cali
Xu, Yan; Cai, Yanpeng; Sun, Tao; Yin, Xin'An; Tan, Qian
2017-06-30
An integrated indicator system was developed for determining synthetic environmental responses under multiple types of coastal reclamation engineering in the Yellow River estuary, China. Four types of coastal engineering works were analyzed, namely port construction, petroleum exploitation, fishery and aquaculture, and seawall defense. In addition, two areas with limited human disturbances were considered for comparison. From the weights of the response value for each indicator, port construction was determined to be the primary impact contributor among the four engineering works studies. Specifically, hydrodynamic conditions, ecological status, economic costs, and engineering intensity were on average 72.78%, 65.03%, 75.03%, and 66.35% higher than those of other engineering types. Furthermore, fishery and aquaculture impact on water quality was 42.51% higher than that of other engineering types, whereas seawall defense impact on landscape variation was 51.75% higher than that of other engineering types. The proposed indicator system may provide effective coastal management in future. Copyright © 2017 Elsevier Ltd. All rights reserved.
The founding of ISOTT: the Shamattawa of engineering science and medical science.
Bruley, Duane F
2014-01-01
The founding of ISOTT was based upon the blending of Medical and Engineering sciences. This occurrence is portrayed by the Shamattawa, the joining of the Chippewa and Flambeau rivers. Beginning with Carl Scheele's discovery of oxygen, the medical sciences advanced the knowledge of its importance to physiological phenomena. Meanwhile, engineering science was evolving as a mathematical discipline used to define systems quantitatively from basic principles. In particular, Adolf Fick's employment of a gradient led to the formalization of transport phenomena. These two rivers of knowledge were blended to found ISOTT at Clemson/Charleston, South Carolina, USA, in 1973.The establishment of our society with a mission to support the collaborative work of medical scientists, clinicians and all disciplines of engineering was a supporting step in the evolution of bioengineering. Traditional engineers typically worked in areas not requiring knowledge of biology or the life sciences. By encouraging collaboration between medical science and traditional engineering, our society became one of the forerunners in establishing bioengineering as the fifth traditional discipline of engineering.
Human impacts on fluvial systems - A small-catchment case study
NASA Astrophysics Data System (ADS)
Pöppl, Ronald E.; Glade, Thomas; Keiler, Margreth
2010-05-01
Regulations of nearly two-thirds of the rivers worldwide have considerable influences on fluvial systems. In Austria, nearly any river (or) catchment is affected by humans, e.g. due to changing land-use conditions and river engineering structures. Recent studies of human impacts on rivers show that morphologic channel changes play a major role regarding channelization and leveeing, land-use conversions, dams, mining, urbanization and alterations of natural habitats (ecomorphology). Thus 'natural (fluvial) systems' are scarce and humans are almost always inseparably interwoven with them playing a major role in altering them coincidentally. The main objective of this study is to identify human effects (i.e. different land use conditions and river engineering structures) on river bed sediment composition and to delineate its possible implications for limnic habitats. The study area watersheds of the 'Fugnitz' River (~ 140km²) and the 'Kaja' River (~ 20km²) are located in the Eastern part of the Bohemian Massif in Austria (Europe) and drain into the 'Thaya' River which is the border river to the Czech Republic in the north of Lower Austria. Furthermore the 'Thaya' River is eponymous for the local National Park 'Nationalpark Thayatal'. In order to survey river bed sediment composition and river engineering structures facies mapping techniques, i.e. river bed surface mapping and ecomorphological mapping have been applied. Additionally aerial photograph and airborne laserscan interpretation has been used to create land use maps. These maps have been integrated to a numerical DEM-based spatial model in order to get an impression of the variability of sediment input rates to the river system. It is hypothesized that this variability is primarily caused by different land use conditions. Finally river bed sites affected by river engineering structures have been probed and grain size distributions have been analyzed. With these data sedimentological and ecological/ecomorphological effects of various river engineering structures (i.e. dams, weirs, river bank- and river bed protection works) on river bed sediment composition and on limnic habitats are evaluated. First results reveal that 'land use' is a dominant factor concerning river bed sediment composition and limnic habitat conditions. Further outcomes will be presented on European Geosciences Union General Assembly, 2010.
Engineering Provision of Assault Crossing of Rivers,
1983-01-21
in the first place, in the missile and nuclear weapons warfare sharply they increased frontage and the depth of troop dispositions in the defense...modern missile and nuclear weapons warfare the medium * and wide rivers, reinforced by mine fields and decomposition of water-engineering and other...PMP and transport motor pool PVD -20. The existing pontoon trains make it possible to mechanize labor-consuming fitters work, to the minimum to bring
DeLonay, Aaron J.; Jacobson, Robert B.; Papoulias, Diana M.; Wildhaber, Mark L.; Chojnacki, Kimberly A.; Pherigo, Emily K.; Haas, Justin D.; Mestl, Gerald E.
2012-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2010 scope of work primarily address spawning as a probable factor limiting pallid sturgeon survival and recovery, although limited pilot studies also have been initiated to examine the requirements of early life stages. The research is designed to inform management decisions affecting channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2010.
18. Photocopy of an engineering drawing (original in the Collection ...
18. Photocopy of an engineering drawing (original in the Collection of the Washington State Department of Public Works)--August 1921--LOCATION-TOPOGRAPHY AND GENERAL ELEVATION - Pasco-Kennewick Bridge, Spanning Columbia River, Pasco, Franklin County, WA
The Built Environment of Cold War Era Servicewomen
2006-08-01
60 Figure 51. WAVES at work on engine maintenance, Naval Air Station Banana River, FL, 30 August 1944...Naval Air Station Banana River, FL, 30 Aug. 1944 (NARA, RG 80-G Box 758, 244458... Banana River, FL, 30 August 1944 (NARA, RG 80-G Box 758, 244460). ERDC/CERL M-06-2 61 Figure 52. WAVES packing parachutes, Naval Air Station
Lehigh River Basin, Hydropower Study. Stage 1. Reconnaissance Report.
1980-09-01
Works and Transportation of the U.S. House of Representatives adopted a resolution authorizing the Board of Engineers for Rivers and Harbors to review... Transportation . Early transportation was difficult. The first settlers relied on Indian trails and both rivers for travel. The first road was laid in...1735 and others quickly followed, but the rivers were the roads during much of the 1700’s. Rafts and dugout canoes transported settlers and their farm
Delonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Braaten, Patrick J.; Buhl, Kevin J.; Eder, Brandon L; Elliott, Caroline M.; Erwin, Susannah O.; Fuller, David B.; Haddix, Tyler M.; Ladd, Hallie L.A.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wesolek, Christopher J.; Wildhaber, Mark L.
2016-01-20
The research tasks in the 2013 scope of work emphasized understanding reproductive migrations and spawning of adult pallid sturgeon, and hatch and drift of free embryos and larvae. These tasks were addressed in four study sections located in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Upper Missouri River downstream from Fort Peck Dam, including downstream reaches of the Milk River, the Lower Yellowstone River, and the Lower Missouri River downstream from Gavins Point Dam. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2013.
Effects of water-resource development on Yellowstone River streamflow, 1928-2002
Eddy-Miller, Cheryl A.; Chase, Katherine J.
2015-01-01
Major floods in 1996 and 1997 intensified public concern about the effects of human activities on the Yellowstone River in Montana. In 1999, the Yellowstone River Conservation District Council, whose members are primarily representatives from the conservation districts bordering the main stem of the Yellowstone River, was formed to promote wise use and conservation of the Yellowstone River’s natural resources. The Yellowstone River Conservation District Council is working with the U.S. Army Corps of Engineers to understand the cumulative hydrologic effects of water-resource development in the Yellowstone River Basin. The U.S. Army Corps of Engineers, Yellowstone River Conservation District Council, and U.S. Geological Survey began cooperatively studying the Yellowstone River in 2010, publishing four reports describing streamflow information for selected sites in the Yellowstone River Basin, 1928–2002. Detailed information about the methods used, as well as summary streamflow statistics, are available in the four reports. The purpose of this fact sheet is to highlight findings from the published reports and describe the effects of water use and structures, primarily dams, on the Yellowstone River streamflow.
Designing forward with an eye to the past: Morphogenesis of the lower Yuba River
NASA Astrophysics Data System (ADS)
James, L. Allan
2015-12-01
The early geomorphic evolution of the lower Yuba River (LYR), northern California, up to 1906 is reconstructed using cartographic, documentary, topographic, and stratigraphic evidence. The importance of early river mining is identified along with rates and patterns of floodplain aggradation and channel incision at the turn of the 20th century. The LYR is a classic example of anthropogeomorphic transformation of a river by episodic hydraulic mining sedimentation. This was followed by channelization, damming, dredging, and other engineering works to redirect, contain, and stabilize channels. These geomorphic changes and engineering controls continue to govern channel and floodplain form and process, control the trajectory of river responses, and constrain flood control, water quality, and aquatic ecosystem management options. Returning a river system to a prior condition should not be the primary goal of river rehabilitation projects, especially if hydrologic inputs have substantially changed. Reconstructing former conditions may be impractical and unsustainable under modern circumstances. Instead, fluvial systems should be designed and managed for present inputs and processes while anticipating future conditions. Rapid changes in land use and climate that generate changes in runoff and sediment loadings are likely to generate morphological instability, and these changes should be considered in the design and management of fluvial systems. The past geomorphic evolution of fluvial systems should also be considered in design and management decisions to recognize trajectories and suppressed tendencies. Recognition of trends and system vulnerabilities may avoid potential blunders, such as removing critical stabilizing works. Complex causalities may be difficult to reconstruct from geomorphic form alone, however, due to process-form dynamics. Detailed research on the geomorphic and engineering history of a river is essential, therefore, if substantial changes and morphologic instabilities have occurred.
How accounting for transient catchment hydrology in the design of river engineering works ?
NASA Astrophysics Data System (ADS)
Rosso, R.; Bocchiola, D.; Rulli, M. C.
2009-04-01
Current engineering practice of hydrologic design is based on hazard estimates that are carried out under the steady state conjecture, i.e. stationarity. This occurs for both assessing averages and second order statistics, and predicting low frequency quantiles. Conversely, routing of hydrologic input variables via known boundary conditions of the systems, i.e. the hydrological basin, can produce non stationary behavior of derived variates, i.e. those required for design. Abrupt changes in the drainage basin can lead to unexpected and profound changes in the magnitude of design events, sometimes providing design loads higher than those expected for a stationary system. Modified connectivity between the constantly developing human mobility network, the drainage system, and the dendritic river topology may result in tremendously modified signature of the climate on hydrologic response. Anthropic footprint on soil use may lead to hugely increased hydrological feedback and floods therein. Transient effects of forest fires in arid or semiarid areas decrease vegetation dampening on runoff production and soil stability, with a dramatic fallout when heavy storms occur within the post event recovery time window. Sudden pulses of fine and coarse sediment occurring in the forest fire's wake, and in connection with rapid mass movements, such as landslides or avalanches in alpine areas, may decrease the effectiveness of engineering works even for unchanged hydrologic loads. New paradigms are necessary to provide enhanced design strategies of river engineering works. These should entail the heavily non linear effects of pulse events with transient effect in time on hydro-morphological dynamics of rivers and increased risk therein, particularly for those works aimed to bear extreme loads, i.e. coping with very high return periods. Major instances deal with dams, power plants, and all those schemes that are very sensitive because of potential consequences of hydrologic catastrophes. Here, examples are given of structures, works and events with transient effect in time affecting the expected hydrological risk, and some strategies sketched to deal with such issues henceforward.
NASA Astrophysics Data System (ADS)
Xu, Y. J.
2016-02-01
Dujiangyan, also known as the Dujiangyan Project, is a hydraulic engineering complex built more than 2260 years ago on the Mingjiang River near Chengdu in China's Sichuan Province. The complex splits the river into two channels, a so-called "inner river" (Leijiang) and an "outer river" (Waijiang) that carry variable water volumes and sediment loads under different river flow conditions. The inner river and its numerous distributary canals are primarily man-made for irrigation over the past 2000 years, while the outer river is the natural channel and flows southward before entering into the Yangtze River. Under normal flow, 60% of the Mingjiang River goes into the inner river for irrigating nearly 1 million hectares of agricultural land on the Chengdu plain. During floods, however, less than 40% of the Mingjiang River flows into the inner river. Under both flow conditions, about 80% of the riverine sediments is carried by the outer river and continues downstream. This hydrology is achieved through a weir work complex that comprises three major components: a V-shaped bypass dike in the center of the Mingjiang River (the Yuzui Bypass Dike, see photo below), a sediment diversion canal in the inner river below the bypass dike (the Feishayan Floodgate), and a flow control in the inner river below the sediment diversion canal (the Baopingkou Diversion Passage). Together with ancillary embankments, these structures have not only ensured a regular supply of silt-reduced water to the fertile Chengdu plain, but have provided great benefits in flood control, sediment transport, and water resources regulation over the past two thousand years. The design of this ancient hydraulic complex ingeniously conforms to the natural environment while incorporating many sophisticated techniques, reflecting the concept that humankind is an integral part of nature. As we are urgently seeking solutions today to save the sinking Mississippi River Delta, examination of the ancient engineering marvel may offer insights into sustainable practices in river engineering of the lower Mississippi under climate change and sea level rise. This paper will introduce the Dujiangyan Project and will discuss possibilities of applying Dujiangyan's fundamental concept for sediment diversions in the Lower Mississippi River.
Man versus Rivers: the lost equilibrium of the Tisza River due to engineering works
NASA Astrophysics Data System (ADS)
Kiss, Timea; Fiala, Károly
2016-04-01
The direct and indirect human impacts alter the catchment and the channel characteristics, which will result in further hydro-morphological alterations of rivers. The modified fluvial environment will create new hydrological hazards for the society, so for the successful and sustainable hazard and risk management it is important to evaluate the equilibrium and sensitivity of rivers. The aim of the paper is to evaluate the hydrological and morphological effects of engineering works along the Tisza River, Hungary. Based on the trends of the different fluvial processes the equilibrium of the river will be evaluated to ground further engineering works. The Tisza River, was one of the first systematically regulated rivers in Europe. In the late 19th century artificial cut-offs were made, shortening the river by ca. 30%. The hydrology and the morphology of the Tisza adapted to this, as the channel became temporarily wider and deeper (by 20-25%). The cut-offs had an effect on the channel for ca. 60-70 years. Simultaneously, artificial levees were built, thus the overbank floodplain aggradation became more intensive (from 0.02-0.07 cm/y to 0.3-0.8 mm/y). The floodplain aggradation became higher by 2-4 times since 1970's, as the vegetation became denser. However, in the 21st c. the floodplain vegetation became so uncontrollably dense, that the pattern and rate of accumulation changed again, and now it is limited just to the banks. So the levee could be considered as continuous disturbing factor, besides, the unmanaged floodplain vegetation appeared as a new disturbing force accelerating the processes. In the 20th century revetments were constructed to stop the lateral migration of the channel. This resulted in channel distortion, as it became sharper and the cross-sectional area decreased by 28%. As revetments were constructed along ca. 51% of the channel, the meandering channel forms became replaced features characteristic in incising rivers, for example point-bars disappeared and mass movements became common, especially in the 21st c. As the channel becomes too narrow and confined, the landslides erode the revetments too, thus a natural channel-widening will took place. Thus, the Tisza aligned to the new hydro-morphology after the artificial cut-offs within few decades, and within the given energy and slope conditions the river reached an equilibrium state. However in the 21st c. there are several evidences on the non-equilibrium state: the height and frequency of floods increase, their discharge decreases; the slope of the river declines; and the specific stream power increases. Morphological sign of the lost equilibrium is the vertical and horizontal distortion of the channel (caused by revetments!) and the decreasing flood conductivity of the floodplain (caused by dense, unmanaged floodplain vegetation). The rate of these processes refers to accelerating equilibrium loss. Thus the state of the Tisza could be referred as "non-equilibrium" or "pseudo-equilibrium". Therefore, if further engineering works will be planned, it must be considered that the river might give unexpected hydro-morphological responses on any disturbance.
42. NORTHEAST VIEW OF BLOW ENGINE HOUSE No. 3, WITH ...
42. NORTHEAST VIEW OF BLOW ENGINE HOUSE No. 3, WITH FILTER CAKE HOSUE IN CENTER FOREGROUND, AND EVAPORATIVE WASTE WATER TREATMENT COOLING TOWER TO THE LEFT. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA
Missouri River Recovery Management Plan and Environmental Impact Statement
2014-04-11
Proficient in hydrologic and hydraulic engineering computer models, particularly ResSim and HEC - RAS ; working experience with large river systems including...to help study teams determine ecosystem responses to changes in the flow regime of a river or connected wetland. HEC -EFM analyses involve: 1...Description of the Model and How It Will Be Applied in the Study Approval Status HEC - RAS The function of this model is to conduct one-dimensional hydraulic
Effects of Flood Control Works Failure in the Missouri River Basin
2014-06-13
Project (“BSNP”). Specifically, in order to restore habitat of certain native species in the Missouri River Basin (“the Basin”), the Corps departed...estimated that over $654 million in damages occurred to agricultural and rural areas (U.S. Army Corps of Engineers 1995, 5-5). There was over $65 million...USACE Kansas City District’s civil works boundary, flooding resulted in estimated damages of greater than $2.2 billion, with agricultural and rural
20. San FranciscoOakland Bay Bridge contract recipients, April 28, 1933, ...
20. San Francisco-Oakland Bay Bridge contract recipients, April 28, 1933, photographer unknown. Standing, left to right: Edward J. Schneider, Columbia Steel Corporation; C.C. Horton, Healy-Tibbitts Construction Company; Henry J. Kaiser, Bridge Builders, Inc.; Albert Huber, Clinton Construction Company; Allan McDonald, Transbay Construction Company; C.C. Carleton, Chief, Division of Contracts and Rights of Way, California Department of Public Works. Seated, left to right: Henry J. Brunnier, Consulting Engineer, Member of Consulting Board, San Francisco-Oakland Bay Bridge; Charles E. Andrew, Bridge Engineer, San Francisco-Oakland Bay Bridge; Earl Lee Kelly, Director, California Department of Public Works; Harrison S. Robinson, President, Financial ... - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
This page contains general information and also examples of programs and organizations working in the Passaic location including: cleaning up the Passaic, US Army Corps of Engineers, the Newark Riverfront Park
A Conversation with James J. Morgan
NASA Astrophysics Data System (ADS)
Morgan, James J.; Newman, Dianne K.
2015-05-01
In conversation with professor Dianne Newman, Caltech geobiologist, James "Jim" J. Morgan recalls his early days in Ireland and New York City, education in parochial and public schools, and introduction to science in Cardinal Hayes High School, Bronx. In 1950, Jim entered Manhattan College, where he elected study of civil engineering, in particular water quality. Donald O'Connor motivated Jim's future study of O2 in rivers at Michigan, where in his MS work he learned to model O2 dynamics of rivers. As an engineering instructor at Illinois, Jim worked on rivers polluted by synthetic detergents. He chose to focus on chemical studies, seeing it as crucial for the environment. Jim enrolled for PhD studies with Werner Stumm at Harvard, who mentored his research in chemistry of particle coagulation and oxidation processes of Mn(II) and (IV). In succeeding decades, until retirement in 2000, Jim's teaching and research centered on aquatic chemistry; major themes comprised rates of abiotic manganese oxidation on particle surfaces and flocculation of natural water particles, and chemical speciation proved the key.
NASA Astrophysics Data System (ADS)
Radecki-Pawlik, Artur; Plesiński, Karol
2016-04-01
In modern river management practices and philosophy one can notice coming more into use ecological friendly hydraulic structures. Those, which are especially needed for river training works, as far as expectation of Water Framework Directive is concerned, are block ramps which are hydraulic structures working similar to riffles known very well from fluvial geomorphology studies and are natural features in streams and rivers. What is important well designed block ramps do not stop fish and invertebrates against migrating, provide natural and esthetical view being built within the river channel, still working as hydraulic engineering structures and might be used in river management in different river ecosystems. The main aim of the research was to describe changes of values of hydrodynamics parameters upstream and downstream of the block ramps and to find out their influence on hydrodynamics of the stream. The study was undertaken on the Porębianka River in the Gorce Mountains, Polish Carpathians. Observed hydrodynamic parameters within the reach of the block ramps depend on the location of measuring point and the influence of individual part of the structure. We concluded that: 1. Hydrodynamic parameters close to block ramps depend on the location of the measurement points in relation to particular elements of the structure; 2. The highest value of velocities don't cause the highest force values, which acting on the bed of the watercourse, because they are rather related to the water level of the channel; 3. The values of mean velocities, shear velocities and shear stresses were similar upstream and downstream the block ramps, which means that the structures stabilize the river bed. This study was performed within the scope of the Science Activity money from Ministry of High Education and Young Scientist's Activity Money of Department of Hydraulics Engineering and Geotechnique, University of Agriculture, Cracow, Poland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poirier, M.R.
2002-06-07
Personnel performed engineering-scale tests at the Filtration Research Engineering Demonstration (FRED) to determine crossflow filter performance with a 5.6 M sodium solution containing varying concentrations of sludge and sodium permanganate. The work represents another in a series of collaborative efforts between the University of South Carolina and the Savannah River Technology Center in support of the process development efforts for the Savannah River Site. The current tests investigated filter performance with slurry containing simulated Tank 40H Sludge and sodium permanganate at concentrations between 0.070 weight percent and 3.04 weight percent insoluble solids.
Newell, Wayne L.; Stone, B.; Harrison, R.; ,
2004-01-01
Holocene alluvium of the Pedhicos River around Lefkosia (Nicosia), Cyprus, was studied. Alluvial stratigraphy was found to present serial flood deposits underlying river terraces and an extensive alluvial fan. It was found that the stratigraphy and geomorphology of the alluvium can be interpreted to distinguish not only the effects of climate change, but also land-use change, and the impact of particular engineering works. It was suggested that details of the physical properties of the flood deposit sequences and paleosols can contribute to modeling various geophysical and engineering properties and in predicting response to vertical acceleration during earthquakes.
An appraisal of the ground-water resources of the Juniata River Basin, Pennsylvania
Seaber, Paul R.; Hollyday, Este F.
1966-01-01
This report describes the availability, quantity, quality, variability, and cost of development of the ground-water resources in the Juniata River basin, one of the larger sub-basins of the Susquehanna River basin. The report has been prepared for and under specifications established by the Corps of Engineers, U. S. Army, and the Public Health Service, Department of Health, Education, and Welfare.A comprehensive study of the water and related land resources of the Susquehanna River basin was authorized by the Congress of the United States in October 1961, and the task of preparing a report and of coordinating the work being done by others in support of the study was assigned to the Corps of Engineers. The comprehensive study is being conducted by several Federal departments and independent agencies in cooperation with the States of New York, Pennsylvania, and Maryland. The Public Health Service under its authority in the Federal Water Pollution Control Act (P. L. 660) initiated a comprehensive water quality control program for the Chesapeake drainage basin, which includes the Susquehanna River basin.
Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities 1960. Volume 1
1960-01-01
M artin, Colo_._....... ........... .... Lookout Point, Oreg . . . . .. .. ... Lucky Peak, Idaho ... . . -- ... Pine Flat, Calif...2 Barren , Ky M-------------- ar 60 1964 Do. Princeton, W. Va---------- ------ Mar 60 1961 Local protection. Proctor, Tex------------------- Jun 60...Arkansas River crested at Pine Bluff, Ark., in October 1959 at a stage of 25 feet, about 1 foot above flood stage. The St. Francis River crested at St
1. Photocopy of engineering drawing (original in the Office of ...
1. Photocopy of engineering drawing (original in the Office of the Cuyahoga County Engineer)--1907 NORTH ROCKY RIVER BRIDGE--PROPOSED DESIGN--REINFORCED CONCRETE: AN ALTERNATIVE DESIGN FOR THE DETROIT AVENUE CROSSING - Rocky River Bridge, Spanning Beaver Dam River, Rocky River, Cuyahoga County, OH
Numerical Simulation of Missouri River Bed Evolution Downstream of Gavins Point Dam
NASA Astrophysics Data System (ADS)
Sulaiman, Z. A.; Blum, M. D.; Lephart, G.; Viparelli, E.
2016-12-01
The Missouri River originates in the Rocky Mountains in western Montana and joins the Mississippi River near Saint Louis, Missouri. In the 1900s dam construction and river engineering works, such as river alignment, narrowing and bank protections were performed in the Missouri River basin to control the flood flows, ensure navigation and use the water for agricultural, industrial and municipal needs, for the production of hydroelectric power generation and for recreation. These projects altered the flow and the sediment transport regimes in the river and the exchange of sediment between the river and the adjoining floodplain. Here we focus on the long term effect of dam construction and channel narrowing on the 1200 km long reach of the Missouri River between Gavins Point Dam, Nebraska and South Dakota, and the confluence with the Mississippi River. Field observations show that two downstream migrating waves of channel bed degradation formed in this reach in response to the changes in flow regime, sediment load and channel geometry. We implemented a one dimensional morphodynamic model for large, low slope sand bed rivers, we validated the model at field scale by comparing the numerical results with the available field data and we use the model to 1) predict the magnitude and the migration rate of the waves of degradation at engineering time scales ( 150 years into the future), 2) quantify the changes in the sand load delivered to the Mississippi River, where field observations at Thebes, i.e. downstream of Saint Louis, suggest a decline in the mean annual sand load in the past 50 years, and 3) identify the role of the main tributaries - Little Sioux River, Platte River and Kansas River - on the wave migration speed and the annual sand load in the Missouri River main channel.
Konrad, Christopher P.
2010-01-01
The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.
NASA Astrophysics Data System (ADS)
Stone, M. C.; Byrne, C.; Morrison, R.
2015-12-01
It is widely recognized that past river engineering, flood control, and floodplain development activities have tended to work against nature rather than with it. The consequence in many cases has been severe degradation of our natural ecosystems. This, combined with an increased appreciation for the benefits of properly functioning ecosystems, has prompted efforts to restore rivers to a more natural state. However, most restoration projects currently focus on a narrow set of goals, such as endangered species recovery or channel stabilization. In order to shift the restoration community towards more holistic perspectives and approaches, it is necessary to improve understanding of river and floodplain hydrogeomorphic processes and their role in supporting healthy ecosystems. The goal of this research was to investigate the impacts of river engineering and restoration practices on the process of floodwave attenuation. This goal was addressed through numerical investigations that allowed us to: (1) quantify mass and momentum fluxes between river channels and floodplains; (2) investigate the influence of mass and momentum fluxes on floodwave attenuation processes; and (3) evaluate the impacts of river and floodplain restoration on floodwave attenuation. Two-dimensional hydrodynamic models were applied to the Rio Grande, San Joaquin, and Gila rivers in the Southwestern United States using novel modeling approaches to describe dynamic floodplain roughness, fluxes at channel/floodplain interfaces, and attenuation along river corridors. The results provide important insights into the role of floodplain characteristics on floodwave movement and the potential for enhancing floodwave attenuation through river restoration.
NOx reduction through combustion optimization at PEPCO`s Potomac River Station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cramer, D.S.; Williams, S.E.; Watkins, J.T.
1995-06-01
This paper describes the work done under EPRI Project RP 3383 at Potomac River Station to reduce NOx emissions by adjusting boiler controls. it details the method followed by PEPCO and Lehigh engineers to achieve a 35% reduction in average NOx emissions over a one-month extended test. Parameters that had the largest effect on NOx are discussed. A description of instruments installed to better monitor and control combustion is included.
2017-09-18
Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental Impact Statement En vi ro nm en ta l L ab or at or y...Engineering Center-River Analysis System (HEC-RAS) Water Temperature Models Developed for the Missouri River Recovery Management Plan and Environmental...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 Under Project 396939, “Missouri River Recovery Management Plan and Environmental
An appraisal of the ground-water resources of the lower Susquehanna River basin (An interim report)
Seaber, Paul R.; Hollyday, Este F.
1965-01-01
This report describes the availability, quantity, quality, variability, and cost of development of the ground-water resources in the lower Susquehanna River basin. The report has been prepared for and under specifications established by the Corps of Engineers, U. S. Army, and the Public Health Service, Department of Health, Education, and Welfare.A comprehensive study of the water and related land resources of the Susquehanna River basin was authorized by the Congress of the United States in October 1961, and the task of preparing a report and of coordinating the work being done by others in support of the study was assigned to the Corps of Engineers. The comprehensive study is being conducted by several Federal departments and independent agencies in cooperation with the States of New York, Pennsylvania, and Maryland. The Public Health Service under its authority in the Federal Water Pollution Control Act (P. L. 660) initiated a comprehensive water quality control program for the Chesapeake drainage basin, which includes the Susquehanna River basin.This report is intended to serve the specific needs for ground-water information of both the Corps of Engineers and the Public Health Service, as well as those of the other participating Federal and State agencies.
1982-03-01
Niederauer (Enerly, Inc.), Lee Butler (WES), Danny Fread (NOAA). Theodor Strelkoff (Hydraulic Enuineering), Robert MacArthur (HEC), Warren Mellema (4RD), Jaime ...Mississippi, Sabine , and Neches Rivers as shown in Figures 1 and 2. Work is on-going to gradually extend this service to other Gulf Coast rivers in Texas...MEXICO FIG. 2-HURRICANE STORM SURGE FORECASTING OF SABINE AND NECHES RIVERS 16 DAM -Z - PLAN VIEW- SEC. VIEW f-f FIG. 3- DAM-BREAK FLOOD ONTO A VERY WIDE
Advances in river ice hydrology 1999-2003
NASA Astrophysics Data System (ADS)
Morse, Brian; Hicks, Faye
2005-01-01
In the period 1999 to 2003, river ice has continued to have important socio-economic impacts in Canada and other Nordic countries. Concurrently, there have been many important advances in all areas of Canadian research into river ice engineering and hydrology. For example: (1) River ice processes were highlighted in two special journal issues (Canadian Journal of Civil Engineering in 2003 and Hydrological Processes in 2002) and at five conferences (Canadian Committee on River Ice Processes and the Environment in 1999, 2001 and 2003, and International Association of Hydraulic Research in 2000 and 2002). (2) A number of workers have clearly advanced our understanding of river ice processes by bringing together disparate information in comprehensive review articles. (3) There have been significant advances in river ice modelling. For example, both one-dimensional (e.g. RIVICE, RIVJAM, ICEJAM, HEC-RAS, etc.) and two-dimensional (2-D; www.river2d.ca) public-domain ice-jam models are now available. Work is ongoing to improve RIVER2D, and a commercial 2-D ice-process model is being developed. (4) The 1999-2003 period is notable for the number of distinctly hydrological and ecological studies. On the quantitative side, many are making efforts to determine streamflow during the winter period. On the ecological side, some new publications have addressed the link to water quality (temperature, dissolved oxygen, nutrients and pollutants), and others have dealt with sediment transport and geomorphology (particularly as it relates to break-up), stream ecology (plants, food cycle, etc.) and fish habitat.There is the growing recognition, that these types of study require collaborative efforts. In our view, the main areas requiring further work are: (1) to interface geomorphological and habitat models with quantitative river ice hydrodynamic models; (2) to develop a manager's toolbox (database management, remote sensing, forecasting, intervention methodologies, etc.) to enable agencies to intervene better at the time of ice-jam-induced floods; and (3) finalize ice-jam prevention methods on the St Lawrence River to safeguard its $2 billion commercial navigation industry. Copyright
1. LOOKING SOUTH AT LOW PURITY BULK OXYGEN BUILDING (FORMERLY ...
1. LOOKING SOUTH AT LOW PURITY BULK OXYGEN BUILDING (FORMERLY BLOW ENGINE HOUSE No. 1), WITH LIQUID OXYGEN STORAGE TANKS IN THE FOREGROUND. - U.S. Steel Duquesne Works, Fuel & Utilities Plant, Along Monongahela River, Duquesne, Allegheny County, PA
2010-09-30
made a nonstatistical selection of three projects at USACE New England for review: Blackstone River Fisherville Pond, Shpack Landfill, and Fox Point...Figure 1. Blackstone River Fisherville Pond What We Found USACE New England complied with the Recovery Act requirements for the three projects...would know how, when, and where tax dollars were spent. Further, the Recovery Act stated that the President and the heads of Federal departments
Physical-scale models of engineered log jams in rivers
USDA-ARS?s Scientific Manuscript database
Stream restoration and river engineering projects are employing engineered log jams increasingly for stabilization and in-stream improvements. To further advance the design of these structures and their morphodynamic effects on corridors, the basis for physical-scale models of rivers with engineere...
Sedimentation and contamination patterns of dike systems along the Rhône River (France)
NASA Astrophysics Data System (ADS)
Seignemartin, Gabrielle; Tena, Alvaro; Piégay, Hervé; Roux, Gwenaelle; Winiarski, Thierry
2017-04-01
Humans have historically modified the Rhône River, especially in the last centuries. In the 19th century, the river was systematically embanked for flood protection purposes, and works continued along the 20th century with dike system engineering work for navigation. The Rhône was canalised and its historical course by-passed by a series of hydroelectric dams. Besides, industrial activity polluted the river. For example, high levels of PCB's were attributed to the inputs of the heavily industrialized zone downstream from Lyon. During floods, these contaminants, associated with the suspended sediment, were trapped by the engineering works and the floodplain. Currently, a master plan to reactivate the river dynamics in the alluvial margins by removing the groyne-fields and dikes in the by-passed sections is being implemented. Within this context, this work aims to assess historical dynamics of sediment and associated contaminants in the floodplain (e.g. trace metal elements), notably in the dike system, in order to evaluate the contamination risk related to bank protection removal. With this objective, a transversal methodology has been applied coupling GIS diachronic analysis (old maps, bathymetric data, Orthophotos, LIDAR, etc.) to understand the historical floodplain evolution, sediment survey to obtain sediment thickness (metal rod and Ground Penetrating Radar), and sediment sampling (manual auger and core sampling) to obtain the metal element concentrations (X-Ray Fluorescence and Inductively Coupled Plasma Mass Spectrometry). By this way, metal element patterns were defined and used as contamination tracing indicators to apprehend the contamination history but also as geochemical background indicators to define the sediment source influence. We found that sediment temporal patterns are directly related with the by-pass construction year. Spatially, fine sediment deposition predominates in the dike systems, being lower in the floodplain already disconnected in the 20th century. Sediment thickness tends to increase in the dike systems following downstream direction. Coupling trace elements (Cu, Zn, Pb) and sediment patterns, metal pollution is mainly observed in the 1970's deposits, similarly to previous studies focused on PCB. These results constitute basic information to inform managers and improve restoration actions that are currently implemented in the Rhône River.
1979-01-01
Major Captain Major Captain U Col Major 1st II Malar Captain Majo r Major Major Ma jor Captain II Col Cotone l Major Colonel Major...tropical storms, society required artifice to survive in a region where nature might reasonably have asked a few more eons to finish a work of creation...Mississippi, and when this work was completed the mouth of Old River was sealed off. Meantime, a control structure at Morganza’ had been finished in
49. LOOKING NORTH AT EVAPORATIVE WASTE WATER TREATMENT COOLING TOWERS, ...
49. LOOKING NORTH AT EVAPORATIVE WASTE WATER TREATMENT COOLING TOWERS, WITH BLOW ENGINE HOUSE No. 3 ON RIGHT, AND FILTER CAKE HOUSE IN FOREGROUND. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA
1986-05-01
design of the outlet works for Warm Springs Dam on Dry Creek in Sonoma County , California, are discussed. Water quality design considerations include both...on Dry Creek, "-’- a right-bank tributary of the Russian River, approximately 14 river miles upstream of their confluence in Sonoma County , California...Dry Creek, Sonoma County , California, are discussed. Water quality design considerations include both temperature and turbidity of discharged water
10. Photocopy of photograph original print located in collection of ...
10. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Hatter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW, LOOKING NORTH, SHOWING ASH AVENUE BRIDGE UNDER CONSTRUCTION. WORK IS PROGRESSING FROM THE SOUTH BANK TO THE NORTH BANK OF THE SALT RIVER - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ
Nature in cities. Renaturalization of riverbanks in urban areas
NASA Astrophysics Data System (ADS)
Wlodarczyk, Anna Marta; Mascarenhas, Jorge Morarji R. Dias
2016-12-01
Most of the rehabilitations of river sections with their banks in cities has often been inappropriate. The reason for this is that designers do not understand the natural functioning of a river and they are synthesizing and sterilizing these urban spaces, distorting its natural functioning. Besides, there are clear proofs that these rehabilitations are useless, contributing to the devaluation of the river ecosystem without improving its relationships with the city. The other effect of the water lines destructions are the educational terms, broadcasting a wrong idea of the functioning of the river. This article tries to show briefly, how a river works, what arethe natural characteristicswhich should be valued by a rehabilitation and what has gone wrong in recent rehabilitation works. Using the theoretical drawings, based on examples from real life, and supported by photographs, the authors present also the possible negative consequences of the urban mistakes for the sake of operating of cities. The paper shows some techniques of natural engineering, using natural materials and vegetation that may be employed. This may become a green intervention, making these techniques much more economic and educational, improving life quality thanks to public access to attractive parks and squares by rivers.
Castle on the Rock: The History of the Little Rock District U.S. Army Corps of Engineers 1881-1985
1990-01-01
Office and Penny Crumpler of the Chief Engineers’ Library also assisted. Jacque Patterson also helped, as did Kathryn Hayes at the St. Louis District...Arkansas .. ........ . .. . . . ... 63 William Henry Harrison Benyaurd . .. . . . .. . .. .... ..... 20 Frisco Railroad Washed Out, Van Buren...improvement work on the Mississippi, Missouri, Arkansas, White, and St. Francis rivers. S9 On 12 July 1870 Lieutenant Colonel William F. Raynolds
Causes for the decline of suspended-sediment discharge in the Mississippi River system, 1940-2007
Meade, R.H.; Moody, J.A.
2010-01-01
Before 1900, the Missouri-Mississippi River system transported an estimated 400 million metric tons per year of sediment from the interior of the United States to coastal Louisiana. During the last two decades (1987-2006), this transport has averaged 145 million metric tons per year. The cause for this substantial decrease in sediment has been attributed to the trapping characteristics of dams constructed on the muddy part of the Missouri River during the 1950s. However, reexamination of more than 60 years of water- and sediment-discharge data indicates that the dams alone are not the sole cause. These dams trap about 100-150 million metric tons per year, which represent about half the decrease in sediment discharge near the mouth of the Mississippi. Changes in relations between water discharge and suspended-sediment concentration suggest that the Missouri-Mississippi has been transformed from a transport-limited to a supply-limited system. Thus, other engineering activities such as meander cutoffs, river-training structures, and bank revetments as well as soil erosion controls have trapped sediment, eliminated sediment sources, or protected sediment that was once available for transport episodically throughout the year. Removing major engineering structures such as dams probably would not restore sediment discharges to pre-1900 state, mainly because of the numerous smaller engineering structures and other soil-retention works throughout the Missouri-Mississippi system. ?? 2009 John Wiley & Sons, Ltd.
Fluvial geomorphology and river engineering: future roles utilizing a fluvial hydrosystems framework
NASA Astrophysics Data System (ADS)
Gilvear, David J.
1999-12-01
River engineering is coming under increasing public scrutiny given failures to prevent flood hazards and economic and environmental concerns. This paper reviews the contribution that fluvial geomorphology can make in the future to river engineering. In particular, it highlights the need for fluvial geomorphology to be an integral part in engineering projects, that is, to be integral to the planning, implementation, and post-project appraisal stages of engineering projects. It should be proactive rather than reactive. Areas in which geomorphologists will increasingly be able to complement engineers in river management include risk and environmental impact assessment, floodplain planning, river audits, determination of instream flow needs, river restoration, and design of ecologically acceptable channels and structures. There are four key contributions that fluvial geomorphology can make to the engineering profession with regard to river and floodplain management: to promote recognition of lateral, vertical, and downstream connectivity in the fluvial system and the inter-relationships between river planform, profile, and cross-section; to stress the importance of understanding fluvial history and chronology over a range of time scales, and recognizing the significance of both palaeo and active landforms and deposits as indicators of levels of landscape stability; to highlight the sensitivity of geomorphic systems to environmental disturbances and change, especially when close to geomorphic thresholds, and the dynamics of the natural systems; and to demonstrate the importance of landforms and processes in controlling and defining fluvial biotopes and to thus promote ecologically acceptable engineering. Challenges facing fluvial geomorphology include: gaining full acceptance by the engineering profession; widespread utilization of new technologies including GPS, GIS, image analysis of satellite and airborne remote sensing data, computer-based hydraulic modeling and geophysical techniques; dovetailing engineering approaches to the study of river channels which emphasize reach-scale flow resistance, shear stresses, and material strength with catchment scale geomorphic approaches, empirical predictions, bed and bank processes, landform evolution, and magnitude-frequency concepts; producing accepted river channel typologies; fundamental research aimed at producing more reliable deterministic equations for prediction of bed and bank stability and bedload transport; and collaboration with aquatic biologists to determine the role and importance of geomorphologically and hydraulically defined habitats.
52. NORTHEASTERN EXTERIOR VIEW OF DOOROLIVER WAST WATER TREATMENT THICKENER ...
52. NORTHEASTERN EXTERIOR VIEW OF DOOR-OLIVER WAST WATER TREATMENT THICKENER No. 1. ELECTRIC POWERHOUSE No. 2 AND BLOW ENGINE HOUSE No. 3 IS IN THE BACKGROUND. (Jet Lowe) - U.S. Steel Duquesne Works, Blast Furnace Plant, Along Monongahela River, Duquesne, Allegheny County, PA
NASA Astrophysics Data System (ADS)
Bulliner, E. A., IV; Erwin, S. O.; Anderson, B. J.; Wilson, H.; Jacobson, R. B.
2016-12-01
The transition from endogenous to exogenous feeding is an important life-stage transition for many riverine fish larvae. On the Missouri River, U.S., riverine alteration has decreased connectivity between the navigation channel and complex, food-producing and foraging areas on the channel margins, namely shallow side channels and sandbar complexes. A favored hypothesis, the interception hypothesis, for recruitment failure of pallid sturgeon is that drifting larvae are not able to exit the highly engineered navigation channel, and therefore starve. We present work exploring measures of hydraulic connectivity between the navigation channel and channel margins using multiple data-collection protocols with acoustic Doppler current profilers (ADCPs). As ADCP datasets alone often do not have high enough spatial resolution to characterize interception and connectivity sufficiently at the scale of drifting sturgeon larvae, they are often supplemented with physical and empirical models. Using boat-mounted ADCPs, we collected 3-dimensional current velocities with a variety of driving techniques (specifically, regularly spaced transects, reciprocal transects, and irregular patterns) around areas of potential larval interception. We then used toolkits based in Python to interpolate 3-dimensional velocity fields at spatial scales finer than the original measurements, and visualized resultant velocity vectors and flowlines in the software package Paraview. Using these visualizations, we investigated the necessary resolution of field measurements required to model connectivity with channel margin areas on large, highly engineered river ecosystems such as the Missouri River. We anticipate that results from this work will be used to help inform models of larval interception under current conditions. Furthermore, results from this work will be useful in developing monitoring strategies to evaluate the restoration of channel complexity to support ecological functions.
Flood trends and river engineering on the Mississippi River system
Pinter, N.; Jemberie, A.A.; Remo, J.W.F.; Heine, R.A.; Ickes, B.S.
2008-01-01
Along >4000 km of the Mississippi River system, we document that climate, land-use change, and river engineering have contributed to statistically significant increases in flooding over the past 100-150 years. Trends were tested using a database of >8 million hydrological measurements. A geospatial database of historical engineering construction was used to quantify the response of flood levels to each unit of engineering infrastructure. Significant climate- and/or land use-driven increases in flow were detected, but the largest and most pervasive contributors to increased flooding on the Mississippi River system were wing dikes and related navigational structures, followed by progressive levee construction. In the area of the 2008 Upper Mississippi flood, for example, about 2 m of the flood crest is linked to navigational and flood-control engineering. Systemwide, large increases in flood levels were documented at locations and at times of wing-dike and levee construction. Copyright 2008 by the American Geophysical Union.
DeLonay, Aaron J.; Jacobson, Robert B.; Papoulias, Diana M.; Wildhaber, Mark L.; Chojnacki, Kimberly A.; Pherigo, Emily K.; Bergthold, Casey L.; Mestl, Gerald E.
2010-01-01
The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The general Comprehensive Sturgeon Research Project strategy is to integrate field and laboratory studies of sturgeon reproductive ecology, habitat requirements, and physiology to produce a predictive understanding of sturgeon population dynamics. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery-Integrated Science Program. The research consists of several interdependent and complementary research tasks engaging multiple disciplines that primarily address spawning as a probable limiting factor in reproduction and survival of the pallid sturgeon. The research is multifaceted and is designed to provide information needed for management decisions impacting habitat restoration, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research activities and progress towards understanding of the species are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by Comprehensive Sturgeon Research Project during 2009.
Shoreline Erosion Processes: Orwell Lake, Minnesota.
1984-12-01
1976) and Savat ( 1981 ) found such splash layer Will absorb much of the impact of the rain- erosion to increase with increasing slope angle, but...pp. 188-196. U.S. Army Corps of Engineers (1979) Flood control, Savat , J. ( 1981 ) Work done by splash: Laboratory Orwell Dam, Otter Tail River
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Supplemental Environmental Impact Statement for the Middle Mississippi River Regulating Works Project, Missouri... stabilization and sediment management to ensure adequate navigation depth and width. Project improvements are...
1980-08-01
ARMY ENGINEER DISTRICT, ST. LOUIS D I Ms FOPATE OF MISSOURI E L E C T p D3 AUGUST, 19ue pTE4ENA lo1 9 o85 UNCLASSIFIED SECURITY CLASSIFICATION OF THIS...Anderson Engineering, Inc. DACW4 3-8,0-C-A673 9 . PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGJAM EL"gNT. PROJ&QT. TASK U.S. Army Engineer District...the-work-reported was accomplished. Leave blank in in-house reports. Block 9 . Performing Organization Name and Address. For in-house reports enter the
Photographic copy of undated 12 x 36 pen and ink ...
Photographic copy of undated 12 x 36 pen and ink drawing by Modjeski, Masters and Chase, Bridge Engineers. Illustrator Unknown. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. PEN AND INK DRAWING OF FINAL PROPOSAL OF BRIDGE OVER THE MISSISSIPPI RIVER, NEW ORLEANS, LA. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
NASA Astrophysics Data System (ADS)
Twilley, R.
2014-12-01
Large river systems are major economic engines that provide national economic wealth in transporting commerce and providing extensive agriculture production, and their coastal deltas are sites of significant ports, energy resources and fisheries. These coupled natural and social systems from the catchment to the coast depend on how national policies manage the river basins that they depend. The fundamental principle of the Mississippi River Basin, as in all basins, is to capitalize on the ability of fertile soil that moves from erosional regions of a large watershed, through downstream regions of the catchment where sediment transport and storage builds extensive floodplains, to the coastal region of deposition where deltas capture sediment and nutrients before exported to the oceans. The fate of soil, and the ability of that soil to do work, supports the goods and services along its path from the catchment to the coast in all large river basin and delta systems. Sediment is the commodity of all large river basin systems that together with the seasonal pulse of floods across the interior of continents provide access to the sea forming the assets that civilization and economic engines have tapped to build national and global wealth. Coastal landscapes represent some of the most altered ecosystems worldwide and often integrate the effects of processes over their entire catchment, requiring systemic solutions to achieve restoration goals from alluvial floodplains upstream to coastal deltaic floodplains downstream. The urgent need for wetland rehabilitation at landscape scales has been initiated through major floodplain reclamation and hydrologic diversions to reconnect the river with wetland processes. But the constraints of sediment delivery and nutrient enrichment represent some critical conflicts in earth surface processes that limit the ability to design 'self sustaining' public work projects; particularly with the challenges of accelerated sea level rise. Only through rethinking how we manage the Mississippi River not only to provide for navigation and flood control, but also as the critical source of sediments to stabilize degrading wetlands, will restoration be realized in a 100-year project cycle.
NASA Astrophysics Data System (ADS)
Khosronejad, Ali; Sotiropoulos, Fotis; Stony Brook University Team
2016-11-01
We present a coupled flow and morphodynamic simulations of extreme flooding in 3 km long and 300 m wide reach of the Mississippi River in Minnesota, which includes three islands and hydraulic structures. We employ the large-eddy simulation (LES) and bed-morphodynamic modules of the VFS-Geophysics model to investigate the flow and bed evolution of the river during a 500 year flood. The coupling of the two modules is carried out via a fluid-structure interaction approach using a nested domain approach to enhance the resolution of bridge scour predictions. The geometrical data of the river, islands and structures are obtained from LiDAR, sub-aqueous sonar and in-situ surveying to construct a digital map of the river bathymetry. Our simulation results for the bed evolution of the river reveal complex sediment dynamics near the hydraulic structures. The numerically captured scour depth near some of the structures reach a maximum of about 10 m. The data-driven simulation strategy we present in this work exemplifies a practical simulation-based-engineering-approach to investigate the resilience of infrastructures to extreme flood events in intricate field-scale riverine systems. This work was funded by a Grant from Minnesota Dept. of Transportation.
NASA Astrophysics Data System (ADS)
Plesiński, Karol; Radecki-Pawlik, Artur
2013-04-01
The paper focuses on understanding some basic hydrodynamic conditions along a regulated river engineered with rapid hydraulic structures (RHS) - the modern hydraulic structure used in river engineering works, to reduce slope of the river bed, stabilize it and reducing river channel bed erosion, at the same time structures being friendly to river environment, allowing fish and invertebrate to migrate and built according the expectations of River Framework Directive EU. The measurements were performed upstream and downstream of RHS within the influence of the structure as well as on the slope apron of the structure where the artificial roughness is created by fixing along all the apron very coarse gravel and small boulders to make the RHS similar to natural rapids in a gravel river. It the field, we measured water depth h, average velocity Va, maximum velocity Vm for different discharges, near bed velocities and all geometry of the RHS. The value of these parameters were used to calculate the shear velocity V*, shear stresses ?, Reynolds number and Froude number. Using our results, we observed that there is a greater range of the values of hydrodynamic parameters downstream of the RHS, where braids and small channels are formed, although this section of a river was engineered. The values of velocities were varied here as follows: Va = 0.194 - 2.210 m s-1 for a high water level and Va = 0.104 - 1.720 m s-1 for a low water level. Consequently, the values of shear stresses were varied here between ? = 0.106 - 4.720 N m-2and ? = 0.013 - 6.084 N m-2 respectively for a high and a low water level. Then, upstream of the RHS, the values of these parameters were comparable. The values of velocities were here as follows: Va = 0.264 - 0.590 m s-1 for a high water level and Va = 0.066 - 0.346 m s-1 for a low water level. And, the values of shear stresses were noticed here as: ? = 0.067 - 0.660 N m-2 and ? = 0.009 - 0.269 N m-2 respectively for high and low water level. Downstream of RHS, the length between river bank embankments was higher than at the upstream channel. It can be concluded that the best solution for engineering works here is to remove existing embankments, due to create a free migration corridor of the river channel. On the slope apron of the rapid hydraulic structure, depending on the location of the measurement points, the values of water velocities and shear stresses were very high during all measurement campaigns. The values of velocities were here as follows: Va = 1.780 - 3.780 m s-1 (Vm = 4.000 m s-1) for a high water level and Va = 0.840 - 3.020 m s-1 (Vm = 3.540 m s-1) for a low water level. Then, the values of maximum shear stresses we calculated were as follows: ? = 32.000 N m-2 and ? = 5.000 N m-2 respectively for a high and low water level. At all the places on the slope apron, there was supercritical flow noticed, as demonstrated by the values of Froude numbers greater than 1.
2016-06-01
Coastal Storm Protection . The Director of ERDC-CHL was José E. Sánchez. At the time of publication of this report, COL Bryan S. Green was the...Marielys Ramos-Villanueva, and Ronald E. Heath Coastal and Hydraulics Laboratory U.S. Army Engineer Research and Development Center 3909 Halls Ferry...behavior. The work was performed by the River Engineering Branch (CEERD-HFR) of the Flood and Storm Protection Division (CEERD-HF), U.S. Army
1982-06-01
p*A C.._ _ __ _ _ A, d.tibutiou is unhimta 4 iit 84~ L0 TABLE OF CONTENTS APPENDIX SCOPE OF WORK B MERGE AND COST PROGRAM DOCUMENTATION C FATSCO... PROGRAM TO COMPUTE TIME SERIES FREQUENCY RELATIONSHIPS D HEC-DSS - TIME SERIES DATA FILE MANAGEMENT SYSTEM E PLAN 1 -TIM SERIES DATA PLOTS AND ANNUAL...University of Minnesota, utilized an early version of the Hydrologic Engineering * Center’s (HEC) EEC-5c Computer Program . EEC is a Corps of Engineers
25 Years Later: A History of the McClellan-Kerr Arkansas River Navigation System in Arkansas
1995-01-01
and Clements, ’’Arkansas River ... Sediment Control," chap. 18, pp. 15-16; Ronald A. Antonino , "The Arkansas River Project," Civil Engineering (Dec...March 8, 1989. Secondary Sources Antonino , Ronald A. "The Arkansas River Project," Civil Engineering (Dec. 1969): 44- 49. Arnold, Morris S
Rep. Norton, Eleanor Holmes [D-DC-At Large
2010-06-16
Senate - 07/21/2010 Received in the Senate and Read twice and referred to the Committee on Environment and Public Works. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:
Robert H. Schueneman
1979-01-01
The U.S. Army Corps of Engineers is involved in the construction and regulation of many activities relating to water resource development. Such activities include dams and reservoirs, channelization and erosion control on rivers and tributaries, and coastal works. These activities can result in an array of visual effects depending on the specific activity type and...
16. Photocopy of Engineering Drawing (original in Engineering News, 4 ...
16. Photocopy of Engineering Drawing (original in Engineering News, 4 October 1890. p. 292), delineator unknown. Scales indicate height in feet above sea level. The gradient in the middle section of the tunnel is incorrectly labeled 1 in 100, whereas the correct gradient is 1 in 1,000. VIEW NORTH, PROFILE OF PART OF ST. CLAIR TUNNEL UNDER RIVER SHOWING SECTION OF RIVER BED AS DETERMINED BY BORINGS, 1890. - St. Clair Tunnel, Under St. Clair River between Port Huron, MI, & Sarnia, ON, Canada, Port Huron, St. Clair County, MI
NASA Astrophysics Data System (ADS)
Anthony, Edward J.; Julian, Maurice
1999-12-01
Steep coastal margins are potentially subject to mass wasting processes involving notable landslide activity and sediment evacuation downstream by steep-gradient streams. Sediment transfer from short source-to-sink segments, coupled with mountain hydrological regimes, regulate patterns of river channel aggradation and coastal sediment supply in such geomorphic settings. On the steep French Riviera margin, sediment transfers from existing landslides or from various minor mass wasting processes to stream channels may result following bursts of heavy, concentrated rainfall. High-magnitude flooding and massive sediment transport downstream are generally related to unpredictable extreme rainfalls. Both mass movements and channel sediment storage pose serious hazards to downvalley settlements and infrastructure. A consideration of channel sediment storage patterns in the Var River catchment, the most important catchment in this area, highlights two important shortcomings relative to environmental engineering and hazard mitigation practices. In the first place, the appreciation of geomorphic processes is rather poor. This is illustrated by the undersized nature of engineering works constructed to mitigate hazards in the upstream bedload-dominated channels, and by the unforeseen effects that ten rock dams, constructed in the early 1970s, have had on downstream and coastal sediment storage and on sediment dispersal patterns and, consequently, valley flooding. Secondly, planners and environmental engineers have lacked foresight in valley and coastal management issues on this steep setting, notably as regards the reclaimed areas of the lower Var channel and delta liable to flooding. Urbanization and transport and environmental engineering works have progressively affected patterns of storage and transport of fine-grained sediments in the lower Var channel and delta. Meanwhile the problems raised by these changes have not been adequately addressed in terms of scientific research. A necessary future step in bettering the engineering solutions implemented to contain natural hazards or to harness water and sediment resources is that of fine-scale analysis of source-to-sink sediment transfer processes, of sediment budgets, of time-scales of storage in stream channels, and, finally, of high-magnitude hydrometeorological forcing events in this area. The way all these aspects have been modulated by engineering practices and socioeconomic development should also be an important part of such an analysis.
Clinch River - Environmental Restoration Program (CR-ERP) study, ambient water toxicity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, C.L.
1997-06-01
Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of July 22-29, 1993, as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 19.0 and Mile 22.0 on July 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth,more » or reproduction) to either species in testing conducted by TVA.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... within the regulated navigation area and: (i) Sustained winds are greater than 25 knots but less than 40 knots, ensure the main engines are ready to provide full power in five minutes or less; and (ii) Sustained winds are 40 knots or over, ensure that the main engines are on line to immediately provide...
Cross-shore stratified tidal flow seaward of a mega-nourishment
NASA Astrophysics Data System (ADS)
Meirelles, Saulo; Henriquez, Martijn; Reniers, Ad; Luijendijk, Arjen P.; Pietrzak, Julie; Horner-Devine, Alexander R.; Souza, Alejandro J.; Stive, Marcel J. F.
2018-01-01
The Sand Engine is a 21.5 million m3 experimental mega-nourishment project that was built in 2011 along the Dutch coast. This intervention created a discontinuity in the previous straight sandy coastline, altering the local hydrodynamics in a region that is influenced by the buoyant plume generated by the Rhine River. This work investigates the response of the cross-shore stratified tidal flow to the coastal protrusion created by the Sand Engine emplacement by using a 13 h velocity and density survey. Observations document the development of strong baroclinic-induced cross-shore exchange currents dictated by the intrusion of the river plume fronts as well as the classic tidal straining which are found to extend further into the nearshore (from 12 to 6 m depth), otherwise believed to be a mixed zone. Estimates of the centrifugal acceleration directly after construction of the Sand Engine showed that the curvature effects were approximately 2 times stronger, suggesting that the Sand Engine might have played a role in controlling the cross-shore exchange currents during the first three years after the completion of the nourishment. Presently, the curvature effects are minute.
Code of Federal Regulations, 2012 CFR
2012-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2011 CFR
2011-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2014 CFR
2014-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2013 CFR
2013-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Code of Federal Regulations, 2010 CFR
2010-07-01
....; experimental test area, U.S. Navy Marine Engineering Laboratory. 334.150 Section 334.150 Navigation and... Marine Engineering Laboratory. (a) The restricted area. The waters of Severn River shoreward of a line beginning at the southeasternmost corner of the U.S. Navy Marine Engineering Laboratory sea wall and running...
Photographic copy of 3 ½ x 5 glass lantern slide ...
Photographic copy of 3 ½ x 5 glass lantern slide no. 2 of March 1925 drawing by Ralph Modjeski, Consulting Engineer. Located in wooden pine box #23 in box 84 of 94 at the National Museum of American History, Smithsonian Institution, Archives Center, Work and industry Division, Washington, D.C. MARCH 1925 DRAWING OF PROPOSED BRIDGE OVER THE MISSISSIPPI RIVER NORTH OF NEW ORLEANS, LOUISIANA, PLAN E. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Remote Sensing of Surficial Process Responses to Extreme Meteorological Events
NASA Technical Reports Server (NTRS)
Brakenridge, G. Robert
1997-01-01
Changes in the frequency and magnitude of extreme meteorological events are associated with changing environmental means. Such events are important in human affairs, and can also be investigated by orbital remote sensing. During the course of this project, we applied ERS-1, ERS-2, Radarsat, and an airborne sensor (AIRSAR-TOPSAR) to measure flood extents, flood water surface profiles, and flood depths. We established a World Wide Web site (the Dartmouth Flood Observatory) for publishing remote sensing-based maps of contemporary floods worldwide; this is also an online "active archive" that presently constitutes the only global compilation of extreme flood events. We prepared an article for EOS concerning SAR imaging of the Mississippi Valley flood; an article for the International Journal of Remote Sensing on measurement of a river flood wave using ERS-2, began work on an article (since completed and published) on the Flood Observatory for a Geoscience Information Society Proceedings volume, and presented lectures at several Geol. Soc. of America Natl. Meetings, an Assoc. of Amer. Geographers Natl. Meeting, and a Binghamton Geomorphology Symposium (all on SAR remote sensing of the Mississippi Valley flood). We expanded in-house modeling capabilities by installing the latest version of the Army Corps of Engineers RMA two-dimensional hydraulics software and BYU Engineering Graphics Lab's Surface Water Modeling System (finite elements based pre- and post-processors for RMA work) and also added watershed modeling software. We are presently comparing the results of the 2-d flow models with SAR image data. The grant also supported several important upgrades of pc-based remote sensing infrastructure at Dartmouth. During work on this grant, we collaborated with several workers at the U.S. Army Corps of Engineers, Remote Sensing/GIS laboratory (for flood inundation mapping and modeling; particularly of the Illinois River using the AIRSAR/TOPSAR/ERS-2 combined data), with Dr. Karen Prestegaard at the University of Maryland (geomorphological responses to the extreme 1993 flood along the Raccoon drainage in central Iowa), and with Mr Tim Scrom of the Albany National Weather Service River Forecast Center (initial planning for the use of Radarsat and ERS-2 for flood warning). The work thus initiated with this proposal is continuing.
A Decade of Hydrological Work in Chekiang Province - Communist China -
1961-03-23
cross-the-river surveys were also created by the station. In 1953, the Hsin -ch’ang non-declination cable current surveying experiment was completed...and weather depot, "When we have a hydrological and weather deport, there is pro- tection for agricultural production. If you want to know to whom...construction, these works have had great effect. They have given assurance to the huge hydro-electric engineering projects at Hsin -an-chiang, Au
33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir...
33 CFR 208.27 - Fort Cobb Dam and Reservoir, Pond (Cobb) Creek, Oklahoma.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Engineer showing the elevation of the reservoir level; number of river outlet works gates in operation with... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Fort Cobb Dam and Reservoir, Pond..., DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.27 Fort Cobb Dam and Reservoir...
Working in the Dry: Cofferdams, In-River Construction, and the United States Army Corps of Engineers
2009-01-01
and dams to manage before 1897, but within 10 years, they would have twenty. Many of the MNC engineers had gained practical experience in small lock...America’s water- ways untapped or under-exploited raw mate- rials requiring development, control, and management for human benefit.6 During the colonial...Section , ^ N 6 to sink into position ^ 5ection 5 Gr<eo.test dapth of waiter in which skeleton wa.s a.ctua.1 ly constru_cted wSig_Lfl fee
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaivoda, Alexis
2003-11-01
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fishmore » Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated or modified. Work was initiated on the removal of one of these culverts, and the replacement of the other. The landowner was agreeable and NEPA was initiated. The modification/elimination of these culverts is scheduled for FY 04. The culvert on Graham Creek is a county road, and will be addressed as a fish passage barrier by Hood River County. The Evans Creek culvert was prepared for modification in FY 02, however due to a lengthy permitting process the instream work period was missed. This project is on the schedule for the instream work period of 2003. OBJECTIVE 7--Construct riparian fence to stabilize and improve the riparian zone along the East Fork Hood River and tributaries. Two riparian fencing projects were completed on East Fork Hood River tributaries. The first was on Baldwin Creek, and the second was on Shelly Creek.« less
Sea Level Operation Demonstration of F404-GE-400 Turbofan Engine with JP-5/Bio-Fuel Mixture
2010-03-30
Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test consisted of two separate...turbofan engine inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station Patuxent River, Maryland, on 13 October 2009. The test...turbofan engine (ESN 310810) inside the Aircraft Test and Evaluation Facility Hush House at Naval Air Station (NAS) Patuxent River, Maryland, on 13
MESA/MEP at American River College: Year One Evaluation Report.
ERIC Educational Resources Information Center
Lee, Beth S.; And Others
In 1989, the Mathematics, Engineering, and Science Achievement (MESA)/Minority Engineering Program (MEP) was initiated at American River College. The MESA/MEP program recruits Black, Hispanic, and Native American students and provides assistance, encouragement, and enrichment programs to help them succeed in the fields of mathematics, engineering,…
Roseau River Subbasin, Red River of the North Reconnaissance Report.
1980-12-01
river. It was found that much of the area was used -,- .for agricultural purposes (cropland and pasture). A narrow corridor € .of woodlands, sometimes... corridor through disturbed (e.g. cropland) areas. The forested areas afford habitats for a greater variety of wildlife than any other major habitat type in...listing as a Federally protected species (U.S. Army Corps of Engineers, 1975; U.S. Fish and Wildife Service, 1980; International Roseau River Engineering
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) ...
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) STRESS DIAGRAM - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
Quality of water of the Colorado River in 1928-1930
Howard, C.S.
1932-01-01
This report gives the results obtained in the continuation of a study of the Colorado River begun in 1925.1 The analyses represent composites of daily samples collected by the observers at the gaging stations on the Colorado River at Cisco, Utah, and Lees Ferry and Grand Canyon, Ariz.; on the Green River at Green River, Utah; and on the San Juan River near Bluff, Utah. Analyses are given for samples collected about once a month from the Williams River at Planet, Ariz. The Arizona stations are operated under the direction of W. E. Dickinson, district engineer of the Geological Survey at Tucson, Ariz., and the Utah stations under the direction of A. B. Purton, district engineer of the Geological Survey at Salt Lake City, Utah. The average discharges given in Table 3 were calculated from data furnished by these district engineers. Complete discharge . data for this period will be published in the regular series of water-supply papers.
Fluvial engineering works in the river bed of the Middle Loire
NASA Astrophysics Data System (ADS)
Nabet, Fouzi
2010-05-01
Since 1995, the Loire riverbed has been a field of restoration and maintenance. These interventions took place within the Plan Loire Grandeur Nature and consisted of the following points: the protection of the inhabitants against flooding risks (opening of the secondary channels), the preservation of the ecological assets and the elimination of the sinking of the water line at it's lower level. This research occurred in a specific part of the Loire riverbed, which is situated between Nevers and Orleans (on both banks). We tried by using a geomorphologic analysis to put in evidence the impact of the interventions on the evolution of the secondary channels and dikes. The Geographical Information System (GIS) put in place for the studies sector helps the space analysis by the superposition and the comparison of the different layers of information. This information tool helps creating a database, which can be updated and extended. This way, the managers of this site can easily integrate new thematic (ecological, pedagogical, tourism activity…) and benefit from a precise mapping of the intervention's areas and the impact of the restoration works. The main objective of the PhD is to analyse the functioning of hydrological and fluvial dynamics of the river bed of the Middle Loire, particularly in areas covered by maintenance work. These fluvial engineering works aim to improve flow and transfer of sediment in the river bed. This approach will evaluate the effectiveness of such maintenance work. It is necessary to set up a very fine scale model to quantify sediment transfer between secondary and main channels. The situation of secondary channels is contrasted, but the excessive growth of vegetation in some channels triggers their perennial functioning. The fine scale analysis is based on studies on seasonal and inter-annual evolution of secondary channels. Digital Elevation models (DEM), longitudinal profiles and topographic cross-sections integrated GIS help to quantify precisely erosion and sedimentation, according to the hydrological year. This work should be conducted according to hydrological events on the basis of topographical, bathymetric and sedimentary surveys. Therefore, a limited number of sites has been chosen in collaboration with AITL, DIREN Centre, and Conservatoire des Espaces Naturels. The result of the thesis brings tools to the Loire river management.
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, ...
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, Seattle) STRESS SHEET - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
Final Section of Australia's Moomba-Sydney line completed
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ives, G. Jr.
1976-12-01
Newham-Techint Gas Line JV, a joint venture between Techint Engineering (Australia) Inc. and Eric Newham (Wallerawang) Pty. Ltd., has finished construction of the final 58-mile leg of the Moomba-Sydney gas line. More than half the line is owned by The Pipeline Authority (a goverment department); the remainder belongs to the privately owned Australian Gas Light Co. Along the right-of-way, the terrain varies from an open farm belt to some 28 miles of rugged sandstone requiring blasting and drilling. In addition, the excessive number of river (2) and stream (43) crossings presented considerable problems to work crews. At the river-crossing sections,more » the pipe was installed (with a minimum of 3-ft cover) in the dry after crews temporarily dammed the river.« less
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, May 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, project location and index - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, June 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, lining details at Hinckston Run - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, June 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, February 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, May 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
NASA Astrophysics Data System (ADS)
Toussaint, Bert
In this paper, the author wants to explore the knowledge development in two crucial fields, river management and coast management in the 19th century and first decades of the 20th century. Were there similar characteristics in this development? Which types of knowledge can be distinguished? Who were the principal actors in these processes? Did the knowledge evolution have a Dutch stamp or a rather international flavour? To structure the analysis, the author uses the concept of technology regime, a set of technical rules which shapes the know-how of engineers, their design rules and research processes. The analysis shows that the knowledge development of river management and coastal management followed different evolution paths between 1800 and 1940. In the field of river management, a substantial amount of mathematical and physical theories had been gradually developed since the end of the 17th century. After 1850, the regularization approach met gradually a widespread support. Empirical data, design rules, theoretical knowledge and engineering pivoted around the regularization approach, and a technology regime around this approach emerged. The regularization regime further developed in the 20th century, and handbooks were increasingly shaped by mathematical and physical reasoning and formulas. On the other hand, coastal management was until the 1880s a rather marginal activity. Coastal engineering was an extremely complex and multidimensional field of knowledge which no engineer was able to grasp. The foundation of a Dutch weather institute was a first important step towards a more theoretical approach. The Zuiderzee works (starting in 1925) gave probably the most important stimuli to scientific coastal research. It was also a main factor in setting up scientific institutes by Rijkswaterstaat. So from the 1920s, Rijkswaterstaat became a major producer of scientific knowledge, not only in tidal modelling but also in coastal research. Due to a multidisciplinary knowledge network, coastal research transformed from a marginal to a first-rank scientific field, and this transformation enabled Rijkswaterstaat to set a much higher level of ambition in coastal management. The 1953 flood and the Deltaworks marked a new era. New design rules for sea dykes and river levees, based on a revolutionary statistical risk approach were determined, and design rules for the Deltaworks estuary closures were developed, being enabled by the development of hydraulic research.
44. LOCK, ELECTRICAL SYSTEM, HAULAGE ENGINES, ELECTRICAL DETAILS AND LOCATION. ...
44. LOCK, ELECTRICAL SYSTEM, HAULAGE ENGINES, ELECTRICAL DETAILS AND LOCATION. February 1938 - Mississippi River 9-Foot Channel Project, Lock & Dam No. 17, Upper Mississippi River, New Boston, Mercer County, IL
8. Historic photo taken during construction of the Lost River ...
8. Historic photo taken during construction of the Lost River Diversion Dam and House. Labeled as follows, 'View showing walk construction North side. Group in foreground, left to right: - J.M. McLean, I.S. Voorhees, Asst Eng'r, A.B. Clevland, engineer... W.W. Patch, Project Engineer.' Negative # 95. Facing east. - Klamath Basin Project, Lost River Diversion Dam House, Lost River near intersection of State Highway 140 & Hill Road, Klamath Falls, Klamath County, OR
Publications - RI 97-15D | Alaska Division of Geological & Geophysical
Tidal Datum Portal Climate and Cryosphere Hazards Coastal Hazards Program Guide to Geologic Hazards in Coastal and River; Coastal and River Hazards; Construction Materials; Derivative; Engineering; Engineering
SECONDARY GENERAL MOTORS DIESEL ENGINE WITH CONNECTION TO REDUCTION GEAR ...
SECONDARY GENERAL MOTORS DIESEL ENGINE WITH CONNECTION TO REDUCTION GEAR BELT DRIVE SYSTEM, LOOKING SOUTH. - Mad River Glen, Single Chair Ski Lift, 62 Mad River Glen Resort Road, Fayston, Washington County, VT
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 1, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of construction downstream at STA. 152+50 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 8, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Stone Arch Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 8, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, view upstream from Bethlehem steel footbridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of stadium upstream from point bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July 23, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view downstream from RB STA. 144+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, May 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, lining details and typical sections of invert - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, August 22, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream at STA. 40+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of construction downstream at First Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 4, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, June 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, control weir at STA. 7+00-Little Conemaugh - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, August 22, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view upstream from point stadium - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 21, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view downstream from Walnut Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 7, 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, general view at Dornick Point - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view downstream from Coopersdale Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 21, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view upstream from prospect viaduct - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of Solomon Run Outlet, looking north - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream from Johns Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view upstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July 18, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream at Walnut Street - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 26, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, general view upstream at Dornick Point - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Point Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 18, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view from Coopersdale Bridge ramp - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 27, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream toward ten acre railroad bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view downstream from Horner Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of weir at point, looking southeast - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army,February 17, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general plan and earthwork distribution - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream STA. 40+75 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July, 11, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from incline bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
ROBOTICS IN HAZARDOUS ENVIRONMENTS - REAL DEPLOYMENTS BY THE SAVANNAH RIVER NATIONAL LABORATORY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kriikku, E.; Tibrea, S.; Nance, T.
The Research & Development Engineering (R&DE) section in the Savannah River National Laboratory (SRNL) engineers, integrates, tests, and supports deployment of custom robotics, systems, and tools for use in radioactive, hazardous, or inaccessible environments. Mechanical and electrical engineers, computer control professionals, specialists, machinists, welders, electricians, and mechanics adapt and integrate commercially available technology with in-house designs, to meet the needs of Savannah River Site (SRS), Department of Energy (DOE), and other governmental agency customers. This paper discusses five R&DE robotic and remote system projects.
Sun, Sand and Water: A History of the Jacksonville District U.S. Army Corps of Engineers 1821-1975
1981-01-01
plan envisioned a dredged cut through the barrier beach to Banana River. On the river there would be a turning basin with terminal facilities, and...intracoastal canal to the west This canal would cut through Merritt Island, which separated Indian River from Banana River.6 District Engineer, Colonel...canal, guarded by two jetties, through the barrier land from the 27 -foot contour line in the Atlantic to a 27 -foot turning basin in the Banana
Photographic copy of 3 ½ x 5 glass lantern slide ...
Photographic copy of 3 ½ x 5 glass lantern slide no. 5A of June 1926 and November 1930 drawing by Ralph Modjeski, Consulting Engineer. Located in wooden pine box #23 in box 84 of 94 at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original photographer unknown. JUNE 1926 AND NOVEMBER 1930 DRAWING OF PROPOSED BRIDGE OVER THE MISSISSIPPI RIVER NORTH OF NEW ORLEANS, LOUISIANA, PLAN E. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
The pallid sturgeon: Scientific investigations help understand recovery needs
DeLonay, Aaron J.
2010-01-01
Understanding of the pallid sturgeon (Scaphirhynchus albus) has increased significantly since the species was listed as endangered over two decades ago. Since 2005, scientists at the U.S. Geological Survey (USGS) Columbia Environmental Research Center (CERC) have been engaged in an interdisciplinary research program in cooperation with the U.S. Army Corps of Engineers Missouri River Recovery Program, U.S. Fish and Wildlife Service, Nebraska Game and Parks Commission, and numerous other State and Federal cooperators to provide managers and policy makers with the knowledge needed to evaluate recovery options. During that time, the USGS has worked collaboratively with river scientists and managers to develop methods, baseline information, and research approaches that are critical contributions to recovery success. The pallid sturgeon is endangered throughout the Missouri River because of insufficient reproduction and survival of early life stages. Primary management actions on the Missouri River designed to increase reproductive success and survival have focused on flow regime, channel morphology, and propagation. The CERC research strategies have, therefore, been designed to examine the linkages among flow regime, re-engineered channel morphology, and reproductive success and survival. Specific research objectives include the following: (1) understanding reproductive physiology of pallid sturgeon and relations to environmental conditions; (2) determining movement, habitat use, and reproductive behavior of pallid sturgeon; and (3) quantifying availability and dynamics of aquatic habitats needed by pallid sturgeon for all life stages.
Engineering-Scale Demonstration of DuraLith and Ceramicrete Waste Forms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Josephson, Gary B.; Westsik, Joseph H.; Pires, Richard P.
2011-09-23
To support the selection of a waste form for the liquid secondary wastes from the Hanford Waste Immobilization and Treatment Plant, Washington River Protection Solutions (WRPS) has initiated secondary waste form testing on four candidate waste forms. Two of the candidate waste forms have not been developed to scale as the more mature waste forms. This work describes engineering-scale demonstrations conducted on Ceramicrete and DuraLith candidate waste forms. Both candidate waste forms were successfully demonstrated at an engineering scale. A preliminary conceptual design could be prepared for full-scale production of the candidate waste forms. However, both waste forms are stillmore » too immature to support a detailed design. Formulations for each candidate waste form need to be developed so that the material has a longer working time after mixing the liquid and solid constituents together. Formulations optimized based on previous lab studies did not have sufficient working time to support large-scale testing. The engineering-scale testing was successfully completed using modified formulations. Further lab development and parametric studies are needed to optimize formulations with adequate working time and assess the effects of changes in raw materials and process parameters on the final product performance. Studies on effects of mixing intensity on the initial set time of the waste forms are also needed.« less
Mineral resources of the Trinity River tributary area in Texas and Oklahoma
Weissenborn, A. E.
1946-01-01
In March 1945 Colonel George R. Goethels, Chief of the Civil Works Division of the Corps of Engineers, requested the Director of the Geological Survey, United States Department of the Interior, to prepare a report on the mineral resource of the area that, according to economic studies made by the Corps of Engineers, would be affected by the canalization of the Trinity River to Fort Worth. As a consequence, the staff of the Geological Survey's Regional Office in Rolla, Mo., was assigned the task of preparing the desired information. A. E. Weissenborn, acting Regional Geologist, called on Major H. R. Norman, Division Engineer of the Corps of Engineers, U. S. Army, and discussed with him the purpose, scope, and form of the proposed report. Following this discussion, Dr. John T. Lonsdale, Director of the Bureau of Economic Geology of the University of Texas, at Mr. Weissenborn's request, agreed that the Bureau of Economic Geology should participate in the preparation of the report. My. Weissenborn also called on Robert H. Dott, Director of the Oklahoma State Geological Survey at Norman, Oklahoma. The Oklahoma Geological Survey was unable to participate in writing the report, but was very helpful in supplying published and unpublished or out-of-print information on the mineral resources of Oklahoma.
17. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ENGINEERS ...
17. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ENGINEERS EXAMINING MODEL PUMPS, VIEW FROM MODEL BED. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS
DISC BRAKE SYSTEM (CENTER), INCLUDING BELT DRIVE TO SECONDARY GENERAL ...
DISC BRAKE SYSTEM (CENTER), INCLUDING BELT DRIVE TO SECONDARY GENERAL MOTORS ENGINE (LEFT)AND FERREL REDUCTION GEAR CONNECTION TO ALLIS-CHALMERS DIESEL ENGINE (RIGHT), LOOKING NORTH. NOTE TORQUE CONVERTER (TOP) AND THROTTLE (BELOW) LINES CONNECTING TO PRIMARY ENGINE. - Mad River Glen, Single Chair Ski Lift, 62 Mad River Glen Resort Road, Fayston, Washington County, VT
Taweel, Abdulali; Shuhaimi-Othman, M; Ahmad, A K
2013-07-01
Concentrations of the heavy metals copper (Cu), cadmium (Cd), zinc (Zn), lead (Pb) and nickel (Ni) were determined in the liver, gills and muscles of tilapia fish from the Langat River and Engineering Lake, Bangi, Selangor, Malaysia. There were differences in the concentrations of the studied heavy metals between different organs and between sites. In the liver samples, Cu>Zn>Ni>Pb>Cd, and in the gills and muscle, Zn>Ni>Cu>Pb>Cd. Levels of Cu, Cd, Zn and Pb in the liver samples from Engineering Lake were higher than in those from the Langat River, whereas the Ni levels in the liver samples from the Langat River were greater than in those from Engineering Lake. Cd levels in the fish muscle from Engineering Lake were lower than in that from the Langat River. Meanwhile, the Cd, Zn and Pb levels in the fish muscle from the Langat River were lower than in that from Engineering Lake, and the Ni levels were almost the same in the fish muscle samples from the two sites. The health risks associated with Cu, Cd, Zn, Pb and Ni were assessed based on the target hazard quotients. In the Langat River, the risk from Cu is minimal compared to the other studied elements, and the concentrations of Pb and Ni were determined to pose the greatest risk. The maximum allowable fish consumption rates (kg/d) based on Cu in Engineering Lake and the Langat River were 2.27 and 1.51 in December and 2.53 and 1.75 in February, respectively. The Cu concentrations resulted in the highest maximum allowable fish consumption rates compared with the other studied heavy metals, whereas those based on Pb were the lowest. A health risk analysis of the heavy metals measured in the fish muscle samples indicated that the fish can be classified at one of the safest levels for the general population and that there are no possible risks pertaining to tilapia fish consumption. Copyright © 2013 Elsevier Inc. All rights reserved.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 23, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, view of channel excavation downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army,February 17, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, plan and profile, STA. 15+00 to STA. 24+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of WPA masonry wall and dike upstream from Central Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 23, 1938 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 1, section of wall in progress, looking downstream from lb STA. 43+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 3, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of Solomon Run, looking north, RB STA. 135+25 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of original drawing, by Corps of Engineers, U.S. ...
Photographic copy of original drawing, by Corps of Engineers, U.S. Army, February 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, cross sections, STA. 96+52.0 to STA. 101+53.5 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 24, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of channel excavation upstream at Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Alexander, Jason S.; Wilson, Richard C.; Green, W. Reed
2012-01-01
The U.S. Geological Survey Forecast Mekong project is providing technical assistance and information to aid management decisions and build science capacity of institutions in the Mekong River Basin. A component of this effort is to produce a synthesis of the effects of dams and other engineering structures on large-river hydrology, sediment transport, geomorphology, ecology, water quality, and deltaic systems. The Mississippi River Basin (MRB) of the United States was used as the backdrop and context for this synthesis because it is a continental scale river system with a total annual water discharge proportional to the Mekong River, has been highly engineered over the past two centuries, and the effects of engineering have been widely studied and documented by scientists and engineers. The MRB is controlled and regulated by dams and river-engineering structures. These modifications have resulted in multiple benefits including navigation, flood control, hydropower, bank stabilization, and recreation. Dams and other river-engineering structures in the MRB have afforded the United States substantial socioeconomic benefits; however, these benefits also have transformed the hydrologic, sediment transport, geomorphic, water-quality, and ecologic characteristics of the river and its delta. Large dams on the middle Missouri River have substantially reduced the magnitude of peak floods, increased base discharges, and reduced the overall variability of intraannual discharges. The extensive system of levees and wing dikes throughout the MRB, although providing protection from intermediate magnitude floods, have reduced overall channel capacity and increased flood stage by up to 4 meters for higher magnitude floods. Prior to major river engineering, the estimated average annual sediment yield of the Mississippi River Basin was approximately 400 million metric tons. The construction of large main-channel reservoirs on the Missouri and Arkansas Rivers, sedimentation in dike fields, and protection of channel banks by revetments throughout the basin, have reduced the overall sediment yield of the MRB by more than 60 percent. The primary alterations to channel morphology by dams and other engineering projects have been (1) channel simplification and reduced dynamism; (2) lowering of channel-bed elevation; and (3) disconnection of the river channel from the flood plain, except during extreme flood events. Freshwater discharge from the Mississippi River and its associated sediment and nutrient loads strongly influence the physical and biological components in the northern Gulf of Mexico. Ninety percent of the nitrogen load reaching the Gulf of Mexico is from nonpoint sources with about 60 percent coming from fertilizer and mineralized soil nitrogen. Much of the phosphorus is from animal manure from pasture and rangelands followed by fertilizer applied to corn and soybeans. Increased nutrient enrichment in the northern Gulf of Mexico has resulted in the degradation of water quality as more phytoplankton grow, which increases turbidity and depletes oxygen in the lower depths creating what is known as the "dead zone." In 2002, the dead zone was 22,000 square kilometers (km2), an area similar to the size of the State of Massachusetts. Changes in the flow regime from engineered structures have had direct and indirect effects on the fish communities. The navigation pools in the upper Mississippi River have aged, and these overwintering habitats, which were created when the pools filled, have declined as sedimentation reduces water depth. Reproduction of paddlefish may have been adversely affected by dams, which impede access to suitable spawning habitats. Fishes that inhabit swift-current habitats in the unimpounded lower Mississippi River have not declined as much as in the upper Mississippi River. The decline of the pallid sturgeon may be attributable to channelization of the Missouri River above St. Louis, Missouri. The Missouri River supports a rich fish community and remains relatively intact. Nevertheless, the widespread and long history of human intervention in river discharge has contributed to the declines of about 25 percent of the species. The Mississippi River Delta Plain is built from six delta complexes composed of a massive area of coastal wetlands that support the largest commercial fishery in the conterminous United States. Since the early 20th century, approximately 4,900 km2 of coastal lands have been lost in Louisiana. One of the primary mechanisms of wetland loss on the Plaquemines-Balize complex is believed to be the disconnection of the river distributary network from the delta plain by the massive system of levees on the delta top, which prevent overbank flooding and replenishment of the delta top by sediment and nutrient deliveries. Efforts by Federal and State agencies to conserve and restore the Mississippi River Delta Plain began over three decades ago and have accelerated over the past decade. Regardless of these efforts, however, land losses are expected to continue because the reduced upstream sediment supplies are not sufficient to keep up with the projected depositional space being created by the combined forces of delta plain subsidence and global sea-level rise.
1. GENERAL VIEW FROM NORTH SIDE OF RIVER LOOKING SOUTHEAST ...
1. GENERAL VIEW FROM NORTH SIDE OF RIVER LOOKING SOUTHEAST OVER ENGINE REPAIR HOUSE, DINKY LEVELS VISIBLE IN DISTANCE - Harbison-Walker Refractories Company, Engine Repair House, West end of Shirley Street, Mount Union, Huntingdon County, PA
1. Photocopied from Photo 1645, Wheelon Station Folder #1, Engineering ...
1. Photocopied from Photo 1645, Wheelon Station Folder #1, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. UTAH SUGAR CO.'S DAM -- BEAR RIVER CANYON. - Irrigation Diversion Canal, Bear River, Fielding, Box Elder County, UT
Clinch River - Environmental Restoration Program (CR-ERP) pilot study, ambient water toxicity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simbeck, D.J.
1997-06-01
Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a pilot study during the week of April 22-29, 1993, prior to initiation of CR-ERP Phase II Sampling and Analysis activities as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0 and Poplar Creek Kilometer 1.6 on April 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories formore » testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA.« less
1960-12-01
such as the Journal of the American Water Works Association, Public Works Magazine, Transactions of the American Society of Civil Engineers, reports of...American Water Works Associa- tion, August 1951. . .P-3 t I Picton 6/ related water use to population growth by application of trends in per capita...Committees on Public Works of the United States Senate and House of Representatives. Of the seven resolutions 1/ pertaining to this survey, five of them
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
.... Army Corps of Engineers Locks, Sault Sainte Marie, MI AGENCY: Coast Guard, DHS. ACTION: Temporary final... Fireworks, St Mary's River, U.S. Army Corps of Engineers Locks, Sault Sainte Marie, MI; in the Federal... celebration, fireworks will be launched from the northeast pier of the U.S. Army Corp of Engineers Soo Locks...
1979-11-01
Engineering Consultants, Inc. Hydraulics & Hydrology Kevin Blume Consoer, Townsend & Assoc., Ltd. Civil and Structural Oran Patrick City of Moberly, Missouri...structure. Photo 13. - View of the diesel powered pump. Photo 14. - View of the electric driven pump. -4 .... Waer 4ork- I’ n Photo lPhotn Wot cr w-.’)rks
1988-11-01
position and pulled through the sediment. Different opening configurations can be used to suit the sediment being removed (Figure 8). 42. The AMTEC ...associated with the New Bedford Harbor site and the relatively large minimum working depth of the AMTEC pneumatic system, this type of dredging
7. Photocopy of 'Map of the Cities of Durango and ...
7. Photocopy of 'Map of the Cities of Durango and Animas,' compiled by Roy F. Goodman, Durango City Engineer, July 8, 1910. PORTION OF MAP SHOWING THE AMERICAN SMELTING AND REFINING COMPANY WORKS ON THE WEST BANK OF THE ANIMAS RIVER. (Original in possession of Durango Public Library.) - San Juan & New York Mining & Smelting Company, Smelter Stack, State Route 160, Durango, La Plata County, CO
Application of HEC-6 to ephemeral rivers of Arizona
DOT National Transportation Integrated Search
1986-01-01
The U.S. Army Corps of Engineers, computer program HEC-6--"Scour and Deposition in Rivers and Reservoirs" was applied to three ephemeral rivers of Arizona--Agua Fria River, Salt River, and Rillito Creek. The input data development techniques and resu...
Atmospheric River Characteristics under Decadal Climate Variability
NASA Astrophysics Data System (ADS)
Done, J.; Ge, M.
2017-12-01
How does decadal climate variability change the nature and predictability of atmospheric river events? Decadal swings in atmospheric river frequency, or shifts in the proportion of precipitation falling as rain, could challenge current water resource and flood risk management practice. Physical multi-scale processes operating between Pacific sea surface temperatures (SSTs) and atmospheric rivers over the Western U.S. are explored using the global Model for Prediction Across Scales (MPAS). A 45km global mesh is refined over the Western U.S. to 12km to capture the major terrain effects on precipitation. The performance of the MPAS is first evaluated for a case study atmospheric river event over California. Atmospheric river characteristics are then compared in a pair of idealized simulations, each driven by Pacific SST patterns characteristic of opposite phases of the Interdecadal Pacific Oscillation (IPO). Given recent evidence that we have entered a positive phase of the IPO, implications for current reservoir management practice over the next decade will be discussed. This work contributes to the NSF-funded project UDECIDE (Understanding Decision-Climate Interactions on Decadal Scales). UDECIDE brings together practitioners, engineers, statisticians, and climate scientists to understand the role of decadal climate information for water management and decisions.
NASA Astrophysics Data System (ADS)
Rosso, R.; Rulli, M. C.
The influence of land use changes on flood occurrence and severity in the Bisagno River (Thyrrenian Liguria, N.W. Italy is investigated using a Monte Carlo simulation approach (Rulli and Rosso, 2002). High resolution land-use maps for the area were reconstructed and scenario simulations were made for a pre-industrial (1878), an intermediate (1930) and a current (1980) year. Land-use effects were explored to assess the consequences of distributed changes in land use due to agricultural practice and urbanisation. Hydraulic conveyance effects were considered, to assess the consequences of channel modifications associated with engineering works in the lower Bisagno River network. Flood frequency analyses of the annual flood series, retrieved from the simulations, were used to examine the effect of land-use change and river conveyance on flood regime. The impact of these effects proved to be negligible in the upper Bisagno River, moderate in the downstream river and severe in the small tributaries in the lower Bisagno valley that drain densely populated urban areas. The simulation approach is shown to be capable of incorporating historical data on landscape and river patterns into quantitative methods for risk assessment.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 8, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, View of Balustrade Wall from footbridge, looking upstream from lb STA. 173+00 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 7, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, view of left bank in construction, looking downstream from RB STA. 63+75 - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 4, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of water line construction upstream at Walnut Street Bridgeupstream from point stadium - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Freshwater Choices in China: Options That Will Impact South and Southeast Asia
2014-12-04
engineering infrastructure upstream on shared international river basins within its borders, and will be able to effectively use the threat of...constructing hydro-engineering infrastructure upstream on shared international river basins within its borders, and will be able to effectively use the...international river basins within its borders, China will be able to effectively use the threat of restricting freshwater flows as a political weapon to
Integrated water resources management using engineering measures
NASA Astrophysics Data System (ADS)
Huang, Y.
2015-04-01
The management process of Integrated Water Resources Management (IWRM) consists of aspects of policies/strategies, measures (engineering measures and non-engineering measures) and organizational management structures, etc., among which engineering measures such as reservoirs, dikes, canals, etc., play the backbone that enables IWRM through redistribution and reallocation of water in time and space. Engineering measures are usually adopted for different objectives of water utilization and water disaster prevention, such as flood control and drought relief. The paper discusses the planning and implementation of engineering measures in IWRM of the Changjiang River, China. Planning and implementation practices of engineering measures for flood control and water utilization, etc., are presented. Operation practices of the Three Gorges Reservoir, particularly the development and application of regulation rules for flood management, power generation, water supply, ecosystem needs and sediment issues (e.g. erosion and siltation), are also presented. The experience obtained in the implementation of engineering measures in Changjiang River show that engineering measures are vital for IWRM. However, efforts should be made to deal with changes of the river system affected by the operation of engineering measures, in addition to escalatory development of new demands associated with socio-economic development.
A pan-Arctic Assessment of Hydraulic Geometry
NASA Astrophysics Data System (ADS)
Chen, H. Z. D.; Gleason, C. J.
2016-12-01
Arctic Rivers are a crucial part of the global hydrologic cycle, especially as our climate system alters toward an uncertain future. These rivers have many ecological and societal functions, such as funneling meltwater to the ocean and act as critical winter transport for arctic communities. Despite this importance, their fluvial geomorphology, in particular their hydraulic geometry (HG) is not fully understood due to their often remote locations. HG, including at-a-station (AHG), downstream (DHG), and the recently discovered At-many-stations (AMHG), provides the empirical basis between gauging measurements and how rivers respond to varying flow conditions, serving as an indicator to the critical functions mentioned above. Hence, a systematic cataloging of the AHG, DHG, and AMHG, of Arctic rivers is needed for a pan-Arctic view of fluvial geomorphic behavior. This study will document the width-based AHG, DHG, and AMHG for rivers wider than 120m with an Arctic Ocean drainage and gauge data with satellite records. First, we will make time-series width measurements from classified imagery at locations along all such rivers from Landsat archive since 1984, accessed within the Google Earth Engine cloud computing environment. Second, we will run available gauge data for width-based AHG, DHG, and AMHG over large river reaches. Lastly, we will assess these empirical relationships, seek regional trends, and changes in HG over time as climate change has on the Arctic system. This is part of an ongoing process in the larger scope of data calibration/validation for the Surface Water and Ocean Topography (SWOT) satellite planned for 2020, and HG mapping will aid the selection of field validation sites. The work showcase an unprecedented opportunity to process and retrieve scientifically significant HG data in the often inaccessible Arctic via Google Earth Engine. This unique platform makes such broad scale study possible, providing a blueprint for future large-area HG research.
Dupuy, Alton J.; Couvillion, Nolan P.
1979-01-01
From March 1977 to July 1978 the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers conducted a series of elutriate studies to determine water quality in selected reaches of major navigable waterways of southern Louisiana. Sample were collected from the Mississippi River-Gulf Outlet areas; Mississippi River, South Pass; Baptiste Collette Bayou; Tiger Pass area; Baou Long; Bayou Barataria and Barataria Bay Waterway area (gulf section); Bayou Segnette Waterway, Lake Pontchartrain near Tangipahoa River mouth; Bayou Grand Caillou; Bayou la Carpe at Homa; Houma Navigation Canal and Terrebonne Bay; Bayou Boeuf, Bayou Chene, and Baou Black, Atchafalaya River Channel, Atchafalaya Bay; Old River Lock tailbay; Red River below mouth of Black River; Freshwaer Canal; Mermentau River and Lake Arthur Mermentau River outlet; and Calcasieu Ship Channel. The studies were initiated at the request of the U.S. Army Corps of Engineers to evaluate possible environmental effects of proposed dredging activities in those waterways. The U.S. Army Corps of Engineers and U.S. Geological Survey collected 189 samples of native water and 172 samples of bottom (bed) material from 163 different sites. A total of 117 elutriates (Mixtures of native water and bottom material) were prepared. The native water and elutriate samples were analyzed for selected metals, pesticides, nutrients organics, and pysical constituents. Particle-size determinations were made on bottom-material samples. (Kosco-USGS)
NASA Astrophysics Data System (ADS)
Larsen, Annegret; Lane, Stuart; Larsen, Joshua
2017-04-01
Beavers (Castor fiber, Castor canadensis) have the ability to actively engineer their habitat, which they can do most effectively in lower order streams and their floodplains. Hence, this engineering has the potential to alter the hydrology, geomorphology, biogeochemistry, and ecology of river systems and the feedbacks between them. Thus, the beaver is often referred to as an 'ecosystem engineer' and is reflected in their recognition as a key species when restoring ecosystems. This capacity to engineer low order streams also shapes a range of positive and negative perceptions on their influence. On the one hand they may be perceived as capable of undermining existing river engineering schemes and the land use of associated floodplains, and on the other hand beavers may provide an alternative to traditional 'hard' engineering, potentially improving river restoration success. The aim of this review is to summarize research to date on the impacts of beavers on stream and floodplain hydrology, geomorphology, water-quality and ecology, and the feedbacks between them. Our review shows that: (1) research has been focused heavily on North American streams, with far less research outside this North American context; (2) there is a tendency to investigate beaver impacts from the perspective of individual disciplines, to the detriment of considering broader process feedbacks, notably at the interface of hydro-geomorphology and riparian ecology; (3) it remains unclear to which extent beavers genuinely engineered streams prior to human impact, pointing to the need for longer term (millennium scale) studies on how beavers have changed river-floodplain systems. Crucially, we conclude that the investigation of the effects of beavers on streams and floodplains, especially in a longer-term, and their use for river restoration can only be understood through the thorough investigation of antecedent hydro-geomorphic conditions which takes account of the ways in which beavers and humans have interacted together over many centuries.
DeLonay, Aaron J.; Papoulias, Diana M.; Jacobson, Robert B.; Wildhaber, Mark L.; Simpkins, Darin G.; Korschgen, Carl E.
2007-01-01
For more than a hundred years, human activities have modified the natural forces that control the Missouri River and its native fish fauna. While the ecological effects of regulation and channel engineering are understood in general, the current understanding is not sufficient to guide river restoration and management. The U.S. Geological Survey (USGS) is in the third year of a multiagency research effort to determine the ecological requirements for reproduction and survival of the endangered pallid sturgeon (Scaphirhynchus albus) and shovelnose sturgeon (Scaphirhynchus platorhynchus) in the Missouri River. The multidisciplinary research strategy includes components of behavior, physiology, habitat use, habitat availability, and population modeling of all life stages. Shovelnose sturgeon are used to design the strategy because they are closely related to the pallid sturgeon and are often used as a surrogate species to develop new research tools or to examine the effects of management actions or environmental variables on sturgeon biology and habitat use. During fiscal years 2005 and 2006, the U.S. Army Corps of Engineers (USACE) provided funds to USGS for tasks associated with the Comprehensive Sturgeon Research Program (CSRP) and for tasks associated with evaluation of the Sturgeon Response to Flow Modifications (SRFM). Because work activities of CSRP and SRFM are so integrated, we are providing information on activities that have been consolidated at the task level. These task activities represent chapters in this report.
Korschgen, Carl E.
2007-01-01
For more than a hundred years, human activities have modified the natural forces that control the Missouri River and its native fish fauna. While the ecological effects of regulation and channel engineering are understood in general, the current understanding is not sufficient to guide river restoration and management. The U.S. Geological Survey (USGS) is in the third year of a multiagency research effort to determine the ecological requirements for reproduction and survival of the endangered pallid sturgeon (Scaphirhynchus albus) and shovelnose sturgeon (Scaphirhynchus platorhynchus) in the Missouri River. The multidisciplinary research strategy includes components of behavior, physiology, habitat use, habitat availability, and population modeling of all life stages. Shovelnose sturgeon are used to design the strategy because they are closely related to the pallid sturgeon and are often used as a surrogate species to develop new research tools or to examine the effects of management actions or environmental variables on sturgeon biology and habitat use. During fiscal years 2005 and 2006, the U.S. Army Corps of Engineers (USACE) provided funds to USGS for tasks associated with the Comprehensive Sturgeon Research Program (CSRP) and for tasks associated with evaluation of the Sturgeon Response to Flow Modifications (SRFM). Because work activities of CSRP and SRFM are so integrated, we are providing information on activities that have been consolidated at the task level. These task activities represent chapters in this report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.
The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. The EOS is one of multiple work groups in the federal research, monitoring, and evaluation (RME)more » effort developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the FCRPS. The EOS is tasked by NOAA Fisheries and the Action Agencies to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the plume.« less
Measuring river from the cloud - River width algorithm development on Google Earth Engine
NASA Astrophysics Data System (ADS)
Yang, X.; Pavelsky, T.; Allen, G. H.; Donchyts, G.
2017-12-01
Rivers are some of the most dynamic features of the terrestrial land surface. They help distribute freshwater, nutrients, sediment, and they are also responsible for some of the greatest natural hazards. Despite their importance, our understanding of river behavior is limited at the global scale, in part because we do not have a river observational dataset that spans both time and space. Remote sensing data represent a rich, largely untapped resource for observing river dynamics. In particular, publicly accessible archives of satellite optical imagery, which date back to the 1970s, can be used to study the planview morphodynamics of rivers at the global scale. Here we present an image processing algorithm developed using the Google Earth Engine cloud-based platform, that can automatically extracts river centerlines and widths from Landsat 5, 7, and 8 scenes at 30 m resolution. Our algorithm makes use of the latest monthly global surface water history dataset and an existing Global River Width from Landsat (GRWL) dataset to efficiently extract river masks from each Landsat scene. Then a combination of distance transform and skeletonization techniques are used to extract river centerlines. Finally, our algorithm calculates wetted river width at each centerline pixel perpendicular to its local centerline direction. We validated this algorithm using in situ data estimated from 16 USGS gauge stations (N=1781). We find that 92% of the width differences are within 60 m (i.e. the minimum length of 2 Landsat pixels). Leveraging Earth Engine's infrastructure of collocated data and processing power, our goal is to use this algorithm to reconstruct the morphodynamic history of rivers globally by processing over 100,000 Landsat 5 scenes, covering from 1984 to 2013.
NASA Technical Reports Server (NTRS)
2010-01-01
Members of the World Presidents' Organization enjoy a buffet luncheon during a Jan. 26 visit to NASA's John C. Stennis Space Center. WPO members from several states toured Stennis facilities during a daylong visit that included a river ride with Special Boat Team 22, the U.S. Navy's elite boat warriors group that trains at Stennis. Visiting president also had an opportunity to learn about the ongoing work of the nation's premier rocket engine testing site.
Impact of Dike Structures on Sediment Transport in the Alluvial Rivers
2012-09-05
recognize their accomplishments. • Arizona Floodplain Management Scholarship —One graduate student (Mary Yeager) working on the project received the...Arizona Floodplain Management Scholarship ($2000), which is to award outstanding graduate students in the area of water resource and floodplain... scholarships or fellowships for further studies in science, mathematics, engineering or technology fields: 3.00 1.00 2.00 0.00 3.00 1.00
2010-01-26
Members of the World Presidents' Organization enjoy a buffet luncheon during a Jan. 26 visit to NASA's John C. Stennis Space Center. WPO members from several states toured Stennis facilities during a daylong visit that included a river ride with Special Boat Team 22, the U.S. Navy's elite boat warriors group that trains at Stennis. Visiting president also had an opportunity to learn about the ongoing work of the nation's premier rocket engine testing site.
1983-12-01
ENGINEERS WALTHAM MR NEWl INLSIID2GSRDDVDEC 83 F/G 13/2 U mEEmhhhohhhmhI MIRO OP RE OAV IS H R L -I- I~JDrought Contingency US Army Corps of Engineers Plan...LA.KE WA’ N, t:ehauc River, 3c,,thhr:Aee ino t irhrid. Massacnusetts -RAIN.A\\, ; AREA 4Q. quare miles ;ro-s’ 322 . saire miles ,net’ sT,’k.,; "’:Es 7lood
76 FR 10524 - Restricted Area, Potomac River, Marine Corps Base Quantico, Quantico, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area, Potomac River, Marine Corps Base Quantico, Quantico, VA AGENCY: United States Army Corps of Engineers... Facility (MCAF) at Marine Corps Base Quantico (MCB Quantico), located in Quantico, Virginia. DATES...
Building NYX [Engineering Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-01-01
From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours company that was without parallel in the shipyard's history. The work, designated the NYX Project'' for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them converted frommore » the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less
Building NYX [Engineering Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-12-31
From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours & company that was without parallel in the shipyard`s history. The work, designated the ``NYX Project`` for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them convertedmore » from the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less
NASA Astrophysics Data System (ADS)
Brown, R. A.; Pasternack, G. B.; Wallender, W. W.
2014-06-01
The synthesis of artificial landforms is complementary to geomorphic analysis because it affords a reflection on both the characteristics and intrinsic formative processes of real world conditions. Moreover, the applied terminus of geomorphic theory is commonly manifested in the engineering and rehabilitation of riverine landforms where the goal is to create specific processes associated with specific morphology. To date, the synthesis of river topography has been explored outside of geomorphology through artistic renderings, computer science applications, and river rehabilitation design; while within geomorphology it has been explored using morphodynamic modeling, such as one-dimensional simulation of river reach profiles, two-dimensional simulation of river networks, and three-dimensional simulation of subreach scale river morphology. To date, no approach allows geomorphologists, engineers, or river rehabilitation practitioners to create landforms of prescribed conditions. In this paper a method for creating topography of synthetic river valleys is introduced that utilizes a theoretical framework that draws from fluvial geomorphology, computer science, and geometric modeling. Such a method would be valuable to geomorphologists in understanding form-process linkages as well as to engineers and river rehabilitation practitioners in developing design surfaces that can be rapidly iterated. The method introduced herein relies on the discretization of river valley topography into geometric elements associated with overlapping and orthogonal two-dimensional planes such as the planform, profile, and cross section that are represented by mathematical functions, termed geometric element equations. Topographic surfaces can be parameterized independently or dependently using a geomorphic covariance structure between the spatial series of geometric element equations. To illustrate the approach and overall model flexibility examples are provided that are associated with mountain, lowland, and hybrid synthetic river valleys. To conclude, recommended advances such as multithread channels are discussed along with potential applications.
Hydraulic shock waves in an inclined chute contraction
NASA Astrophysics Data System (ADS)
Jan, C.-D.; Chang, C.-J.
2009-04-01
A chute contraction is a common structure used in hydraulic engineering for typical reasons such as increase of bottom slope, transition from side channel intakes to tunnel spillways, reduction of chute width due to bridges, transition structures in flood diversion works, among others. One of the significant chute contractions in Taiwan is that used in the Yuanshantzu Flood Diversion Project of Keelung River. The diversion project is designed to divert flood water from upper Keelung River into East Sea with a capasity of 1,310 cubic meters per second for mitigating the flood damage of lower part of Keelung River basin in Northern Taiwan. An inclined chute contraction is used to connect Keelung River and a diversion turnel. The inlet and outlet works of the diversion project is located at Ruifang in the Taipei County of north Taiwan. The diameter of diversion tunnel is 12 meters and the total length of tunnel is 2,484 meters. The diversion project has been completed and successfully executed many times since 2004 to lower the water level of Keelung River in typhoon seasons for avioding flooding problems in the lower part of Keelung River basin. Flow in a chute contraction has complicated flow pattern due to the existence of shock waves in it. A simple and useful calculation procedure for the maximum height and its position of shock waves is essentially needed for the preliminary design stage of a chute contraction. Hydraulic shock waves in an inclined chute contraction were experimentally and numerically investigated in this study with the consideration of the effects of sidewall deflection angle, bottom inclination angle and Froude number of approaching flow. The flow pattern of hydraulic shock waves in a chute contraction was observed. The main issue of designing chute contraction is to estimate the height and position of maximum shock wave for the consideration of freeboards. Achieving this aim, the experimental data are adopted and analyzed for the shock angle, the height of maximum shock wave and the corresponding position of maximum shock wave. The dimensionless relations for the shock angle, the height of maximum shock wave and the corresponding position of maximum shock wave are obtained by regression analysis. These empirical regression relations, basically relating to the sidewall deflection angle, bottom angle and approach Froude number, are very useful for further practical engineering applications in chute contraction design for avoiding flow overtopping.
2006-08-01
and on the west by the Banana River, which is an estuarine system. Figure 1-1 shows CCAFS and the surrounding area. CCAFS encompasses approximately...barrier island on which it is located characterizes the visual environment in the vicinity of CCAFS. The Indian and Banana rivers separate the...large expanses of inland waters in the Indian, Banana , and St. John’s rivers and large ENVIRONMENTAL ASSESSMENT-ENGINEERING SERVICES FACILITY AT
Climatic control of Mississippi River flood hazard amplified by river engineering.
Munoz, Samuel E; Giosan, Liviu; Therrell, Matthew D; Remo, Jonathan W F; Shen, Zhixiong; Sullivan, Richard M; Wiman, Charlotte; O'Donnell, Michelle; Donnelly, Jeffrey P
2018-04-04
Over the past century, many of the world's major rivers have been modified for the purposes of flood mitigation, power generation and commercial navigation. Engineering modifications to the Mississippi River system have altered the river's sediment levels and channel morphology, but the influence of these modifications on flood hazard is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability before the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood hazard on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño-Southern Oscillation and the Atlantic Multidecadal Oscillation, but that the artificial channelization (confinement to a straightened channel) has greatly amplified flood magnitudes over the past century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the past 500 years, reveal that the magnitude of the 100-year flood (a flood with a 1 per cent chance of being exceeded in any year) has increased by 20 per cent over those five centuries, with about 75 per cent of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood hazard to levels that are unprecedented within the past five centuries.
Contreras, Daniel A.; Keefer, David K.
2009-01-01
Channeling of water through a variety of architectural features represents a significant engineering investment at the first millennium B.C. ceremonial center of Chavín de Huántar in the Peruvian Central Andes. The site contains extensive evidence of the manipulation of water, apparently for diverse purposes. The present configuration of the two local rivers, however, keeps available water approximately 9m below the highest level of water-bearing infrastructure in the site. Geomorphic and archaeological investigation of the fluvial history of the Wacheqsa River has revealed evidence that the Chavín-era configuration of the Wacheqsa River was different. A substantially higher water level, likely the result of a local impoundment of river water caused by a landslide dam, made the provision of water for the hydrologic system within the site a more readily practical possibility. We review what is known of that system and argue that the fluvial history of the Wacheqsa River is critical to understanding this aspect of hydrologic engineering and ritual practice at Chavín. This study demonstrates the relative rapidity and archaeological relevance of landscape change in a dynamic environment.
76 FR 79167 - Notice for the Great Lakes and Mississippi River Interbasin Study (GLMRIS)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... DEPARTMENT OF DEFENSE Department of the Army Corps of Engineers Notice for the Great Lakes and Mississippi River Interbasin Study (GLMRIS) AGENCY: Department of the Army, U.S. Army Corps of Engineers, DOD... Area Waterway System'' (ANS Control Paper). An Aquatic Nuisance Species (ANS) Control is an option or...
Responses of experimental river corridors to engineered log jams
USDA-ARS?s Scientific Manuscript database
Physical models of the Big Sioux River, SD, were constructed to assess the impact on flow, drag, and bed erosion and deposition in response to the installation of two different types of engineered log jams (ELJs). A fixed-bed model focused on flow velocity and forces acting on an instrumented ELJ, a...
23. Photocopy of original photo from Corps of Engineers, Los ...
23. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) CONSTRUCTION PHOTO SHOWING CURVED CONCRETE CHUTE SPILLWAY. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
21. Photocopy of original photo from Corps of Engineers, Los ...
21. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) SALINAS DAM UNDER CONSTRUCTION IN 1941. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
24. Photocopy of original photo from Corps of Engineers, Los ...
24. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown, report located at City of San Luis Obispo.) SALINAS DAM COMPLETION PHOTO. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
NASA Astrophysics Data System (ADS)
Petrovszki, Judit; Timár, Gábor; Molnár, Gábor
2014-05-01
The multi-variable connection between the channel slope, bankfull discharge and sinuosity values were analysed to get a mathematical formula, which describes the responses of the rivers, and gives the probable sinuosity values for every slope and discharge values. Timár (2003) merged two planar diagrams into a quasi 3D graph. One of them displayed how the river pattern changes, according to the slope and bankfull discharge values (Leopold and Wolmann, 1957; Ackers and Charlton, 1971); the other based on flume experiments, and gives a connection between the slope and sinuosity (Schumm and Khan, 1972). The result graph suggests that the slope-sinuosity connection also works along the natural rivers, for every discharge values. The aim of this work was to prove this relation, and describe it numerically. The sinuosity values were calculated along the natural, meandering river beds, using historical maps (2nd Military Survey of the Habsburg Empire, from the 19th century). The available slope and discharge values were imported from a database measured after the main river control works, at the beginning of the 20th century (Viczián, 1905). Analysing the reports of the river control works, the natural slope could be computed for every river sections. The mean discharges were also converted to bankfull discharges. Neither long time series, nor cross sectional areas were obtainable, so other method was used to generate the bankfull discharge. After the above mentioned corrections a quadratic polynomial surface was fitted onto these points with least squares regression. The cross section of this surface follows the theoretical slope-sinuosity graph, verifying that the flume experiments and natural rivers behave similarly. The differences between the fitted surface and the original points were caused by other river parameters, which also affect the natural rivers (e.g. the sediment discharge). Furthermore, this graph confirms the connection between the slope and sinuosity, so the sinuosity is a useable parameter to detect the changing slope. The research is made in the frame of project OTKA-NK83400 (SourceSink Hungary). The European Union and the European Social Fund also have provided financial support to the project under the grant agreement no. TÁMOP 4.2.1./B-09/1/KMR-2010-0003. References: Ackers, P., Charlton, F. G. (1971): The slope and resistance of small meandering channels. Inst. Civil Engineers Proc. Supp. XV, Paper 73625. Leopold, L. B., Wolman, M. G. (1957): River chanel patterns; braided, meandering and straight. USGS Prof. Paper 282B: 1-73. Schumm, S. A., Khan, H. R. (1972): Experimental study of channel patterns. Geol. Soc. Am. Bull. 83:1755-1770. Timár, G. (2003): Controls on channel sinuosity changes: a case study of the Tisza River, the Great Hungarian Plain. Quaternary Science Reviews 22: 2199-2207. Viczián E. (1905): Magyarország vízierői. Pallas, Budapest, 349 o.
33 CFR 207.10 - Charles River, Mass.; dam of Charles River Basin Commission.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Charles River, Mass.; dam of Charles River Basin Commission. 207.10 Section 207.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.10 Charles River, Mass.; dam of...
33 CFR 207.10 - Charles River, Mass.; dam of Charles River Basin Commission.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Charles River, Mass.; dam of Charles River Basin Commission. 207.10 Section 207.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.10 Charles River, Mass.; dam of...
Fish community structure in natural and engineered habitats in the Kansas River
White, K.; Gerken, J.; Paukert, Craig P.; Makinster, Andrew S.
2010-01-01
We investigated fish assemblage structure in engineered (rip-rap) and natural habitats (log jams and mud banks) in the Kansas River USA to determine if natural structures had higher abundance and diversity of fishes at a local spatial scale. A total of 439 randomly selected sites were boat electrofished from May to August 2005 and 2006. Mean species diversity and richness were significantly higher in rip-rap than log jams and mud banks. Mean relative abundance (CPUE; number of fish collected per hour electrofishing) of six of the 15 most common fishes (>1% of total catch) were most abundant in rip-rap, two were most abundant in log jams, and none in mud banks. Rip-rap had the highest relative abundance of fluvial specialist and macrohabitat generalists, whereas mean CPUE of fluvial dependents was highest in log jams. Although a discriminant function analysis indicated that nine size classes (eight species) discriminated among three habitat types, the high misclassification rate (38%) suggested a high degree of fish assemblage overlap among the habitats. Although previous work has suggested that engineered structures (rip-rap) and urbanization are linked to reduced biotic diversity or reduced growth of fish species, our results suggest that at a local scale rip-rap may not have the same negative impacts on fish assemblages.
Fish community structure in natural and engineered habitats in the Kansas river
White, K.; Gerken, J.; Paukert, C.; Makinster, A.
2010-01-01
We investigated fish assemblage structure in engineered (rip-rap) and natural habitats (log jams and mud banks) in the Kansas River USA to determine if natural structures had higher abundance and diversity of fishes at a local spatial scale. A total of 439 randomly selected sites were boat electrofished from May to August 2005 and 2006. Mean species diversity and richness were significantly higher in rip-rap than log jams and mud banks. Mean relative abundance (CPUE; number of fish collected per hour electrofishing) of six of the 15 most common fishes (>1% of total catch) were most abundant in rip-rap, two were most abundant in log jams, and none in mud banks. Rip-rap had the highest relative abundance of fluvial specialist and macrohabitat generalists, whereas mean CPUE of fluvial dependents was highest in log jams. Although a discriminant function analysis indicated that nine size classes (eight species) discriminated among three habitat types, the high misclassification rate (38%) suggested a high degree of fish assemblage overlap among the habitats. Although previous work has suggested that engineered structures (rip-rap) and urbanization are linked to reduced biotic diversity or reduced growth of fish species, our results suggest that at a local scale rip-rap may not have the same negative impacts on fish assemblages.
1. BLACK RIVER CANAL PARSHALL FLUME AT UPPER END ...
1. BLACK RIVER CANAL - PARSHALL FLUME AT UPPER END OF SUPPLY (USED BY STATE ENGINEER). VIEW TO NORTHEAST - Carlsbad Irrigation District, Black River Canal, 15 miles Southeast of Carlsbad near Malaga, Carlsbad, Eddy County, NM
6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE ...
6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE RIVER BRIDGE, ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, PARHAM CONT. CO., CONTRACTOR' - Augusta Bridge, Spanning White River at Highway 64, Augusta, Woodruff County, AR
2012-05-16
Regional Command RCP Route Clearance Platoon RSOI Reception, Staging, Onward Movement, Integration SBCT Stryker Brigade Combat Team TOE Table of...Point (ASPs), and field hospital platforms; prepare river crossing sites; and support port repair due to Hydraulic Excavator (HYEX), provides force...platforms, FARPS, supply routes, roads, control points, fire bases, tank ditches, ASPs, and field hospital platforms; prepare river crossing sites; and
Climatic control of Mississippi River flood hazard amplified by river engineering
NASA Astrophysics Data System (ADS)
Munoz, Samuel E.; Giosan, Liviu; Therrell, Matthew D.; Remo, Jonathan W. F.; Shen, Zhixiong; Sullivan, Richard M.; Wiman, Charlotte; O’Donnell, Michelle; Donnelly, Jeffrey P.
2018-04-01
Over the past century, many of the world’s major rivers have been modified for the purposes of flood mitigation, power generation and commercial navigation. Engineering modifications to the Mississippi River system have altered the river’s sediment levels and channel morphology, but the influence of these modifications on flood hazard is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability before the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood hazard on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño–Southern Oscillation and the Atlantic Multidecadal Oscillation, but that the artificial channelization (confinement to a straightened channel) has greatly amplified flood magnitudes over the past century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the past 500 years, reveal that the magnitude of the 100-year flood (a flood with a 1 per cent chance of being exceeded in any year) has increased by 20 per cent over those five centuries, with about 75 per cent of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood hazard to levels that are unprecedented within the past five centuries.
1977-09-01
On 24 June 1974 Packer applied to the St. Paul District, Corps of Engineers (Corps) for a DOA permit under Section 10 of the River and Harbor Act of...exercised jurisdiction under Section 404 of P.L. 92-500 to the ordinary high water mark of the • Mississippi River, Thu’, even though the proposed project...Corps of Engineers was to expand their regulatory IT ril ct ion under Sect ion 404 of P.l.. 92-500 ,nd to promulgate new r- ’~giiI.,t .; ill conjunct
Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shaw, R. Todd; Sexton, Amy D.
The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on themore » mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included development of a 105-foot well for off-stream livestock watering at approximately River Mile 12.0 Wildhorse Creek and construction of an engineered stream ford at approximately River Mile 3.0 Mission Creek. A total of $277,848 in financial cost share assistance was provided by the Confederated Tribes of the Umatilla Indian Reservation, U.S. Bureau of Indian Affairs, U.S. Environmental Protection Agency, U.S. Department of Agriculture, National Oceanic and Atmospheric Administration, U.S. Workforce Investment Act, Oregon Watershed Enhancement Board, Umatilla County and Pheasants Forever for planning efforts and habitat enhancements. Monitoring continued to quantify baseline conditions and the effects of habitat enhancements in the upper basin. Daily stream temperatures were collected from June through September at 22 sites. Suspended sediment samples were obtained at three gage stations to arrive at daily sediment load estimates. Photographs were taken at 96 existing and three newly established photo points to document habitat recovery and pre-project conditions. Transects were measured at three stream channel cross sections to assist with engineering and design and to obtain baseline data regarding channel morphology. Biological inventories were conducted at River Mile 3.0 Mission Creek to determine pre-project fish utilization above and below the passage barrier. Post-project inventories were also conducted at River Mile 85.0 of the Umatilla River at a project site completed in 1999. Umatilla Subbasin Watershed Assessment efforts were continued under a subcontract with Eco-Pacific. This watershed assessment document and working databases will be completed in fiscal year 2002 and made available to assist project personnel with sub-watershed prioritization of habitat needs. Water Works Consulting, Duck Creek Associates and Ed Salminen Consulting were subcontracted for watershed assessment and restoration planning in the Meacham Creek Subwatershed. A document detailing current conditions in the Meacham Creek Subwatershed and necessary restoration actions will be available for review in 2003.« less
The purpose of the Mississippi River map series is to provide the U.S. Army Corps of Engineers with a comprehensive and contemporary view of the Mississippi River, and to provide a basis for identifying ecological vulnerability throughout the Mississippi River Basin. The current...
Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities 1966. Volume 1
1966-01-01
Pines ), Cypress Creek, Tex. 4,336,000 Clark Hill Reservoir, Savannah River, S.C. & Ga. -------- 4,264,000 Lake Cumberland (Wolf Creek Dam), Cumberland... Plymouth Harbor, Mass ......... Rollison Channel, N.C - Texas City Channel, Tex. (40- foot)----------- Wallisville Reservoir_ Schedul Date started fiscal...Project Pat Mayse, Tex - Perry, Kans__ Perry County, Mo- Pine Creek, Okla _ Pine Flat, Calif_ Fiscal year started 1965 1964 1937 1963 1947 Proctor, Tex_
1975-03-01
Aetna Telephone and Telegraph Company Z60 E. Washington Avenue Meyerstown, PA 19602 Mr. James Vallosio, Supervisor Engineering Department Heidelberg...line: (1) Miscellaneous Book Volume 311, page 456, Berks County Records - Clarence W. Mengel and Lillian W. Mengel, his wife and Henry L. Kalbach and...Marion B. Kalbach , his wife - agreement ) and right of way to Bernville Borough Authority. (2) Mi ’ ellaneous Book Volume 311, Page 509, Berks County
Lehigh River Basin, Trexler Lake, Jordan Creek, Pennsylvania. Final Environmental Impact Statement.
1973-01-01
InI w-.ater table elevations in the project arra . A lmg in lnn( uti lization from prim-arily private ag-ricultural and] res ident iil.rr’ to nubli c...AND ADDRESS 10. PROGRAM ELEMENT, PROJECT , TASK U.S. Army Engineer District Philadelphia AREA & WORK UNIT NUMBERS 2nd & Chestnut Sts. / I Philadelphia...Administrative ( ) Legislative 2. Description of Action. The Trexler project is located in Lehigh County in southeastern Pennsylvania. The dfm site is
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billings, C.; Lazar, C.
1980-06-01
A walk-through survey was conducted on January 30, 1979, at the Engineering Works Division Shipyard of the Dravo Corporation in Pittsburgh, Pennsylvania, to determine whether this site would be suitable for inclusion in the in-depth survey of the shipbuilding-industry segment of the investigation of health hazards to painters. The shipyard is engaged in the design and construction of barges and towboats for river transport of bulk cargoes. Out of a workforce of 1,200 production personnel, there are 10 spray painters, 13 brush painters, 3 sign painters, and 10 painters' assistants. The painters have a low turnover rate and the companymore » has personnel records dating back to World War I. A safety and industrial-hygiene program operates at the facility and requires respiratory usage and various engineering controls for many painting operations. The authors conclude that the facility needs a better industrial-hygiene program than is now in effect. They recommend that the facility be included for consideration in the final study.« less
Corbett, J J; Robinson, A L
2001-04-01
This paper describes measurements of NOx emissions from one engine on a commercial towboat operating on the Upper Ohio River system around the Port of Pittsburgh. Continuous measurements were made over a one-week period to characterize emissions during normal operations. The average NOx emission factor is 70 +/- 4.2 kg of NOx per t of fuel, similar to that of larger marine engines. A vessel-specific duty cycle is derived to characterize the towboat's operations; more than 50% of the time the vessel engines are at idle. Although recently promulgated EPA regulations apply only to new marine engines, these data provide insight into inland-river operations, which can be used to evaluate these regulations within the inland river context. This vessel operates as a courier service, scheduling pickups and deliveries of single- or multiple-barge loads per customers' requests; as many as 30% of the 277 towboats in the Pittsburgh region operate in this fashion. The EPA-prescribed ISO E3 duty cycle does not accurately describe inland-river operations of this towboat: its application overestimates actual NOx emissions by 14%. Only 41% of this vessel's operations fall within the Not-To-Exceed Zone defined by the EPA regulations, which limits the effectiveness of this component of the regulations to limit emissions from vessels that operate in a similar fashion.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... of Intent To Prepare an Environmental Impact Statement for the Missouri River Recovery Management Plan, Missouri River, United States AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD... amended, the U.S. Army Corps of Engineers (USACE), Kansas City and Omaha Districts, intend to prepare the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County, NC AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Proposed rule. SUMMARY: The U.S. Army requested that the U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers 33 CFR Part 334 Restricted Area in Cape Fear River and Tributaries at Sunny Point Army Terminal, Brunswick County, NC AGENCY: U.S. Army Corps of Engineers, DoD. ACTION: Direct final rule. SUMMARY: The U.S. Army requested that the U.S...
7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE ...
7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE RIVER BRIDGE, BUILT BY ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, LIST & WEATHERLY, CONSTRUCTION CO.' - Newport Bridge, Spanning White River at State Highway 14, Newport, Jackson County, AR
22. Photocopy of original photo from Corps of Engineers, Los ...
22. Photocopy of original photo from Corps of Engineers, Los Angeles District, 'Report on Salinas Dam, Salinas River, California,' June 15, 1943. (Photographer unknown; report located at City of San Luis Obispo.) CONSTRUCTION PHOTO SHOWING THE STRUTS, POURED TO ALIGN WITH THE RIGHT (WEST) BUTTRESS. - Salinas Dam, Salinas River near Pozo Road, Santa Margarita, San Luis Obispo County, CA
Clinch River - Environmental Restoration Program (CR-ERP) study, Ambient water toxicity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simbeck, D.J.
1997-06-01
Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a study during the week of January 25-February 1, 1994, as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0, Poplar Creek Mile 1.0, and Poplar Creek Mile 2.9 on January 24, 26, and 28. Samples were partitioned (split) and provided to the CR-ERP and TVA toxicology laboratories for testing. Exposure of test organisms tomore » these samples resulted in no toxicity (survival or growth) to fathead minnows; however, toxicity to daphnids (significantly reduced reproduction) was demonstrated in undiluted samples from Poplar Creek Mile 1.0 in testing conducted by TVA based on hypothesis testing of data. Point estimation (IC{sub 25}) analysis of the data, however, showed no toxicity in PCM 1.0 samples.« less
Exploring pre-channelization bar and planform dynamics of a large regulated Alpine River
NASA Astrophysics Data System (ADS)
Zen, Simone; Zolezzi, Guido; Scorpio, Vittoria; Mastronunzio, Marco; Bertoldi, Walter; Comiti, Francesco; Daiprà, Elena
2017-04-01
As a consequence of heavy channelization mostly carried out in the 1800s, the planform and bars morphodynamics of many large European rivers is hardly detectable even from aerial images dating back several decades, because of the marked reduction of the channel width and of the related morphological complexity. However, when available, historical maps can provide quantitative information on the morphology that characterized these rivers before massive human intervention occurred. In this work we focus on a 100 km reach of the Adige - Etsch River, NE, Italy, with the aim of exploring the short-term (some decades) morphological dynamics that might have characterized the pre-channelized river bed and planform in its single-thread reaches before heavy human intervention. To this aim we integrate the application of a morphodynamic analytical model for meandering rivers with irregularly varying curvature and channel width with the multi-temporal analysis of pre-channelization historical maps. The work focuses on the sinuous and meandering reaches once characterized by spatially varying channel width, and presence of alternate, point and mid-channel bars. Challenges in such kind of integrated analysis are posed by the reconstruction of channel - forming streamflow values and of sediment size that may have characterized the river reaches up to nearly three centuries ago prior to heavy regulation. Formative discharge ranges have been obtained as those generating the best geometrical fit between the modeled river bed morphology and the one observed from the maps. Once calibrated by this procedure, the model was fed through the estimated discharge value to compute the longitudinal variability of the outer-bank shear stress, as a proxy for the locations potentially affected by fluvial bank erosion. The historical maps reveal that during the 17th and 18th century, before the massive channelization, the river morphodynamics was already far from being "natural", especially because of distributed, albeit simple engineering structures, like bank protection works, wooden barriers and groynes. Results showed good correspondence between both position of the centroid of the polygons that identified the deposited sediment of the alternate and point bars. Interestingly, the location of near-bank maximum shear stress was often close to the position of the bank structures detected in the historical maps. The satisfactory results obtained from model applications supports the use of analytical morphodynamic models as suitable tools to explore past, otherwise hidden river morphodynamics, especially if integrated with historical sources. The same model could be used, together with more sophisticated numerical tools, to develop possible response scenarios of the present river bed morphology to future restoration actions based on locally giving more room to the river.
NASA Astrophysics Data System (ADS)
Vimal, S.; Tarboton, D. G.; Band, L. E.; Duncan, J. M.; Lovette, J. P.; Corzo, G.; Miles, B.
2015-12-01
Prioritizing river restoration requires information on river geometry. In many states in the US detailed river geometry has been collected for floodplain mapping and is available in Flood Risk Information Systems (FRIS). In particular, North Carolina has, for its 100 Counties, developed a database of numerous HEC-RAS models which are available through its Flood Risk Information System (FRIS). These models that include over 260 variables were developed and updated by numerous contractors. They contain detailed surveyed or LiDAR derived cross-sections and modeled flood extents for different extreme event return periods. In this work, over 4700 HEC-RAS models' data was integrated and upscaled to utilize detailed cross-section information and 100-year modelled flood extent information to enable river restoration prioritization for the entire state of North Carolina. We developed procedures to extract geomorphic properties such as entrenchment ratio, incision ratio, etc. from these models. Entrenchment ratio quantifies the vertical containment of rivers and thereby their vulnerability to flooding and incision ratio quantifies the depth per unit width. A map of entrenchment ratio for the whole state was derived by linking these model results to a geodatabase. A ranking of highly entrenched counties enabling prioritization for flood allowance and mitigation was obtained. The results were shared through HydroShare and web maps developed for their visualization using Google Maps Engine API.
75 FR 81464 - Safety Zone; Columbia River, The Dalles Lock and Dam
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
...-AA00 Safety Zone; Columbia River, The Dalles Lock and Dam AGENCY: Coast Guard, DHS. ACTION: Temporary... Columbia River in the vicinity of The Dalles Lock and Dam while the Army Corps of Engineers completes...; Columbia River, The Dalles Lock and Dam (a) Location. The following is a safety zone: All waters of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
...-Cities landfill, Salt River Pima-Maricopa Indian Community. 49.22 Section 49.22 Protection of Environment... MANAGEMENT Tribal Authority § 49.22 Federal implementation plan for Tri-Cities landfill, Salt River Pima... construction of electricity-generating engines owned and operated by the Salt River Project at the Tri-Cities...
17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing plan of bars in top flange, elevation of girder reinforcement, plan of bars in bottom flange - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing general plan, plan of top chord, elevation of main girder, transverse section, plan section at deck level. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing elevation of center pier, elevation and plan of north and south abutments, sections of abutments, pier, and pier footings - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
Assessing the performance of multi-purpose channel management measures at increasing scales
NASA Astrophysics Data System (ADS)
Wilkinson, Mark; Addy, Steve
2016-04-01
In addition to hydroclimatic drivers, sediment deposition from high energy river systems can reduce channel conveyance capacity and lead to significant increases in flood risk. There is an increasing recognition that we need to work with the interplay of natural hydrological and morphological processes in order to attenuate flood flows and manage sediment (both coarse and fine). This typically includes both catchment (e.g. woodland planting, wetlands) and river (e.g. wood placement, floodplain reconnection) restoration approaches. The aim of this work was to assess at which scales channel management measures (notably wood placement and flood embankment removal) are most appropriate for flood and sediment management in high energy upland river systems. We present research findings from two densely instrumented research sites in Scotland which regularly experience flood events and have associated coarse sediment problems. We assessed the performance of a range of novel trial measures for three different scales: wooded flow restrictors and gully tree planting at the small scale (<1 km2), floodplain tree planting and engineered log jams at the intermediate scale (5-60 km2), and flood embankment lowering at the large scale (350 km2). Our results suggest that at the smallest scale, care is needed in the installation of flow restrictors. It was found for some restrictors that vertical erosion can occur if the tributary channel bed is disturbed. Preliminary model evidence suggested they have a very limited impact on channel discharge and flood peak delay owing to the small storage areas behind the structures. At intermediate scales, the ability to trap sediment by engineered log jams was limited. Of the 45 engineered log jams installed, around half created a small geomorphic response and only 5 captured a significant amount of coarse material (during one large flood event). As scale increases, the chance of damage or loss of wood placement is greatest. Monitoring highlights the importance of structure design (porosity and degree of channel blockage) and placement in zones of high sediment transport to optimise performance. At the large scale, well designed flood embankment lowering can improve connectivity to the floodplain during low to medium return period events. However, ancillary works to stabilise the bank failed thus emphasising the importance of letting natural processes readjust channel morphology and hydrological connections to the floodplain. Although these trial measures demonstrated limited effects, this may be in part owing to restrictions in the range of hydroclimatological conditions during the study period and further work is needed to assess the performance under more extreme conditions. This work will contribute to refining guidance for managing channel coarse sediment problems in the future which in turn could help mitigate flooding using natural approaches.
Designing and Implementation of River Classification Assistant Management System
NASA Astrophysics Data System (ADS)
Zhao, Yinjun; Jiang, Wenyuan; Yang, Rujun; Yang, Nan; Liu, Haiyan
2018-03-01
In an earlier publication, we proposed a new Decision Classifier (DCF) for Chinese river classification based on their structures. To expand, enhance and promote the application of the DCF, we build a computer system to support river classification named River Classification Assistant Management System. Based on ArcEngine and ArcServer platform, this system implements many functions such as data management, extraction of river network, river classification, and results publication under combining Client / Server with Browser / Server framework.
12. Detail of clutch and backup gasoline engine for powering ...
12. Detail of clutch and backup gasoline engine for powering Stoney gates. Clutch mechanism manufactured by Baldridge Machine Company, Detroit, Michigan, ca. 1910. Instrument to the left records volume of flow through headworks. View looking south towards Stoney gates. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
2014-08-01
Hydrokinetic Turbine Development Affecting the US Army Corps of Engineers by David L. Smith, John M. Nestler, Richard Styles, and Brian Tetreault BACKGROUND...attendant environmental impacts. One family of renewable energy technologies experiencing increased national interest is hydrokinetic turbines ...Hydrokinetic turbines include systems that convert waves, tides, and river flow (without impoundment) into electric energy. River hydrokinetic turbines
NASA Astrophysics Data System (ADS)
Viparelli, Enrica; Gaeuman, David; Wilcock, Peter; Parker, Gary
2011-02-01
Major changes in the morphology of the Trinity River in California, such as narrowing of the cross section and sedimentation of fine sediment in pools, occurred after the closure of a system of dams. These changes caused a dramatic reduction in the salmonid population and a resulting decline of the fishery. Gravel augmentation, regulated flood releases, and mechanical channel rehabilitation are currently being implemented to help restore the aquatic habitat of the river. The present paper describes a tool, named the Spawning Gravel Refresher, for designing and predicting the effects of gravel augmentation in gravel bed rivers. The tool assumes an imposed, cycled hydrograph. The model is calibrated and applied to the regulated reach of the Trinity River in four steps: (1) zeroing runs to reproduce conditions of mobile bed equilibrium as best can be estimated for the predam Trinity River, (2) runs to compare the predictions with the results of previous studies, (3) runs at an engineering time scale to reproduce the effects of the dams, and (4) runs to design gravel augmentation schemes. In the fourth group of runs, the combined effects of engineered flood flow releases and gravel augmentation are predicted. At an engineering time scale, the model indicates that the fraction of fine sediment in the surface layer and in the topmost part of the substrate should decrease when subjected to these two restoration measures, with a consequent improvement of the quality of the spawning gravel.
An 80-year record of sediment quality in the lower Mississippi River
Van Metre, Peter C.; Horowitz, Arthur J.
2013-01-01
In 1937, the US Army Corps of Engineers cut through the "neck" of a large meander on the lower Mississippi River (below the confluence with the Ohio River) forming the Caulk Neck cutoff and creating Lake Whittington, a 26-km long oxbow lake, in northern Mississippi. Since 1938, seasonal flooding and a boat channel connecting the lake with the Mississippi River have led to sediment accumulation in the lake, resulting in an 80-year record of sediment quality in the river. On the basis of an age-dated sediment core from the lake, trends in trace metals and hydrophobic organic compounds (except polycyclic aromatic hydrocarbons) follow well-known patterns with upward trends from the 1930s to the ca 1970s, followed by downward trends to the present. Two factors contribute to these patterns: reservoir construction and changes in emissions. The construction of seven large reservoirs on the Missouri River, in particular the closure of the Fort Randall (1953) and Gavins Point (1955) Dams, greatly reduced the load of relatively clean sediment to the Mississippi River, likely contributing to downstream increases in contaminant concentrations in the Mississippi River. Increasing anthropogenic emissions also contributed to upward trends until ca 1970 when major environmental policy actions began resulting in broad decreases in emissions and downward trends in the concentrations of most of the contaminants monitored. Polycyclic aromatic hydrocarbons and phosphorus are partial exceptions to this pattern, with increases to the 1960s and variable concentrations showing no clear trend since. Published 2012. This article is a U.S. Government work and is in the public domain in the USA.
1987 Annual Report of the Reservoir Control Center, Southwestern Division, Army Corps of Engineers
1988-01-01
sediment ranges along the MClellan-Kerr Arkansas River Navigation Project. Due to the funding priorities assigned to reservoir sedimentation resurveys, it’ s...winter with the majority being released in February and March 1988. Numerous small deviations, which ranged from channel work to bridge construction...1987. This was still within the range of the conservation pool. The maximum pool elevation was 6,222.54 (61,668 ac-ft) on 20 June. Pueblo Reservoir is a
The Coast Artillery Journal. Volume 80, Number 2, March-April 1937
1937-04-01
prevailed exceedingly upon the earth.-GEN. 7: 9. ~IKnal CurllS PI The papers raised the cry of red tape. were working without regard to hours, food ...Engineers could furnish the steamboats and the river barges needed to transport large quantities of food and sup- plies. Hence they soon found themselves...evacuated, and who therefore had to be furnished food and water. No blame can be attached to the mayor of the city when, foreseeing this emergency, he
Annual Report of the Chief of Engineers, U.S. Army on Civil Works Activities 1963. Volume 1-2
1964-01-01
Walla Walla, Wash. Land of sand, sage, and solitude. A generation back, the scatter of settlers along the barren Columbia-Snake River shoreline accepted...pride for a generation’s accomplishment. Below McNary, the Umatilla- Plymouth Bridge across the Columbia makes a visit possible to both the Oregon and...Boardman, and Umatilla on the Oregon shore and Roosevelt and Plymouth on the opposite Washington shore are all being reborn on higher ground above the
1984-12-01
IOWA I .1 0 VOLUME! TECHNICAL REPORT Prepared Under the Supervision of With the Assistance of Patricia M. Emerson Harlan R. Finney Principal...POLK COUNTY, IOWA VOLUME I o TECHNICAL REPORT DECEMBER 1984 V Prepared Under the Supervision of Patricia M. Emerson, Principal Investigator With the...U.S. Army Corps of Engineers flood-control reservoir located on the Des Moines River In Polk County, Iowa . The work reported herein was done as a
Annual Report of the Chief of Engineers, U.S. Army, on Civil Works Activities 1961. Volume 1
1961-01-01
dollars) Classification Total Active De - Ink Total Active De - In- ferred active ferred active Navigation..------------------ 2,604 2,450 42 112 6,138...Sioux City, Iowa.... New York and New Jersey Channels, N.Y. and N.J.. Pike Island Locks and Dam, Ohio River, W. Va..... Playa Del Rey Inlet and Harbor...Jun 61 -1965 Do. Hall Meadow Brook, Conn __ . ___------- - Oct 60 1962 Reservoir. Hunt and Lima Lake Drainage District, Illinois
Wash load and bed-material load transport in the Yellow River
Yang, C.T.; Simoes, F.J.M.
2005-01-01
It has been the conventional assumption that wash load is supply limited and is only indirectly related to the hydraulics of a river. Hydraulic engineers also assumed that bed-material load concentration is independent of wash load concentration. This paper provides a detailed analysis of the Yellow River sediment transport data to determine whether the above assumptions are true and whether wash load concentration can be computed from the original unit stream power formula and the modified unit stream power formula for sediment-laden flows. A systematic and thorough analysis of 1,160 sets of data collected from 9 gauging stations along the Middle and Lower Yellow River confirmed that the method suggested by the conjunctive use of the two formulas can be used to compute wash load, bed-material load, and total load in the Yellow River with accuracy. Journal of Hydraulic Engineering ?? ASCE.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the City of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
..., LLC (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing U. S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. The proposed...
A River Discharge Model for Coastal Taiwan during Typhoon Morakot
2012-08-01
Multidisciplinary Simulation, Estimation, and Assimilation Systems Reports in Ocean Science and Engineering MSEAS-13 A River Discharge...in this region. The island’s major rivers have correspondingly large drainage basins, and outflow from these river mouths can substantially reduce the...Multidisciplinary Simulation, Estimation, and Assimilation System (MSEAS) has been used to simulate the ocean dynamics and forecast the uncertainty
19. REGIONAL MAP, SALINAS RIVER PROJECT, CAMP SAN LUIS OBISPO, ...
19. REGIONAL MAP, SALINAS RIVER PROJECT, CAMP SAN LUIS OBISPO, IN CENTRAL PORTION OF SAN LUIS OBISPO, CALIFORNIA. Leeds Hill Barnard & Jewett - Consulting Engineers, February 1942. - Salinas River Project, Cuesta Tunnel, Southeast of U.S. 101, San Luis Obispo, San Luis Obispo County, CA
Designing a water leasing market for the Mimbres River, New Mexico.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reno-Trujillo, Marissa Devan; Tidwell, Vincent Carroll; Broadbent, Craig
2013-04-01
The objective of this study is to develop a conceptual framework for establishing water leasing markets in New Mexico using the Mimbres River as a test case. Given the past and growing stress over water in New Mexico and the Mimbres River in particular, this work will develop a mechanism for the short term, efficient, temporary transfer of water from one user to another while avoiding adverse effects on any user not directly involved in the transaction (i.e., third party effects). Toward establishing a water leasing market, five basic tasks were performed, (1) a series of stakeholder meetings were conductedmore » to identify and address concerns and interests of basin residents, (2) several gauges were installed on irrigation ditches to aid in the monitoring and management of water resources in the basin, (3) the hydrologic/market model and decision support interface was extended to include the Middle and Lower reaches of the Mimbres River, (4) experiments were conducted to aid in design of the water leasing market, and (5) a set of rules governing a water leasing market was drafted for future adoption by basin residents and the New Mexico Office of the State Engineer.« less
Sherfy, Mark H.; Stucker, Jennifer H.; Anteau, Michael J.
2009-01-01
Habitat conditions are one of the most important factors determining distribution and productivity of least terns (Sternula antillarum) and piping plovers (Charadrius melodus) in the upper Missouri River system (Ziewitz and others, 1992; Kruse and others, 2002). Habitat conditions are known to change within and among seasons in response to variation in river flows, weather conditions, and management actions targeted at providing for the needs of terns and plovers. Although these principles are generally agreed upon, there is little empirical information available on the quantity and quality of tern and plover habitats in this system, particularly with reference to the major life history events that must be supported (egg laying, incubation, and brood rearing). Habitat requirements for these events are composed of two major categories: nesting and foraging habitat. In the case of piping plovers, these two requirements must occur on the same area because plover chicks are constrained to foraging near nesting sites prior to fledging (Knetter and others, 2002; Haffner, 2005). In contrast, least terns chicks are fed by the adults, allowing food procurement for broods to occur outside the immediate nesting area; however, food resources must be close enough to nesting locations to minimize foraging time. The complexity and dynamics of the upper Missouri River system introduce considerable uncertainty into how best to manage tern and plover habitats, and how best to evaluate the effectiveness of this management. An extensive program of habitat monitoring will be needed to address this complexity and support the management of least terns and piping plovers under the Missouri River Recovery Program. These needs are being addressed, in part, through a program of habitat creation and management targeted at improving quality and quantity of habitats for terns and plovers. Given the momentum of these projects and their associated costs, it is imperative that the capacity be available to quantify changes in managed habitats for least terns and piping plovers, so that management effectiveness can be evaluated. Extremely high flows and flooding of the Missouri River in 1997 created and improved vast amounts of nesting habitat for least terns and piping plovers. Since 1998, there has been an apparent loss and/or degradation of habitat throughout the river system. However, during the same timeframe reservoir water levels have declined, exposing extensive piping plover breeding habitat. For example, 64 percent of adult piping plovers using the Missouri River in 2005 were observed on reservoir habitats, and 43 percent were observed on Lake Sakakawea (Threatened and Endangered Species Section, Omaha District, U.S. Army Corps of Engineers, unpub. data, 2006). Given the vast dynamics of this river and reservoir system, systemwide monitoring of habitat is clearly needed for the U.S. Army Corps of Engineers (USACE) to employ adaptive management (with respect to river operations) to provide most optimal conditions for the maintenance of breeding habitat of least terns and piping plovers. As a result of this need, the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, began work on a habitat monitoring plan in 2005 as a conceptual framework for adaptive management.
River Basin Scale Management and Governance: Competing Interests for Western Water
NASA Astrophysics Data System (ADS)
Lindquist, Eric
2015-04-01
One of the most significant issues in regard to how social scientists understand environmental and resource management is the question of scale: what is the appropriate scale at which to consider environmental problems, and associated stakeholders (including hydrologists) and their interests, in order to "govern" them? Issues of scale touch on the reality of political boundaries, from the international to the local, and their overlap and conflict across jurisdictions. This presentation will consider the questions of environmental management and governance at the river basin scale through the case of the Boise River Basin (BRB), in southwest Idaho. The river basin scale provides a viable, and generalizable, unit of analysis with which to consider theoretical and empirical questions associated with governance and the role of hydrological science in decision making. As a unit of analysis, the "river basin" is common among engineers and hydrologists. Indeed, hydrological data is often collected and assessed at the basin level, not at an institutional or jurisdictional level. In the case of the BRB much is known from the technical perspective, such as infrastructure and engineering factors, who manages the river and how, and economic perspectives, in regard to benefits in support of major agricultural interests in the region. The same level of knowledge cannot be said about the political and societal factors, and related concepts of institutions and power. Compounding the situation is the increasing probability of climate change impacts in the American West. The geographic focus on the Boise River Basin provides a compelling example of what the future might hold in the American West, and how resource managers and other vested interests make or influence river basin policy in the region. The BRB represents a complex and dynamic environment covering approximately 4,100 square miles of land. The BRB is a highly managed basin, with multiple dams and diversions, and is regarded as a highly desirable amenity and ecosystem service provider for the region. It is also a very polarizing construct as diverse interests engaged in basin decision making do not share the same values, perceptions, and constituents. Although regulatory and jurisdictional decision making is in the hands of a few agencies (US Army Corps of Engineers and US Bureau of Reclamation, for example), it is estimated that up to 300 different interests and groups are engaged in using, supporting, and attempting to influence the decisions associated with the Boise River and its myriad uses. Building on previous river basin governance research in the US and Europe, the work presented here is framed on a policy network approach, and focuses on four main factors of the BRB: the type of stakeholder and their perceptions of the BRB as a resource or amenity, role(s) of the stakeholder in the network, interactions between network members and the public, and the role of science, uncertainty and the impact of climate change. This contribution addresses many of the question raised in the HS5.7 call for abstracts and will be of interest to a wide audience.
Directional Gila River crossing saves construction, mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saylor, L.A.
1994-12-01
Directional drilled river crossing technology gained a new convert this fall as El Paso Natural Gas Co. (EPNG) replaced a washed out 10 3/4-in. line that crossed the Gila River and two irrigation canals near Yuma, Ariz. The 1,650-ft bore, the company's first drilled river crossing, saved both construction costs and environmental reporting and mitigation expenses. This paper reviews the planning, engineering, and equipment used to install this river pipeline crossing.
Extent and frequency of floods on the Schuylkill River near Phoenixville and Pottstown, Pennsylvania
Busch, William F.; Shaw, Lewis C.
1973-01-01
Knowledge of the frequency and extent of flooding is an important requirement for the design of all works of man bordering or encroaching on flood plains. The proper design of bridges, culverts, dams, highways, levees, reservoirs, sewage-disposal systems, waterworks and all structures on the flood plains of streams requires careful consideration of flood hazards. -1- By use of relations presented in this report, the extent, depth, and frequency of flooding can be estimated for any site along the reach of the Schuylkill River from Oaks to Pottstown. These flood data are presented so that regulatory agencies, organizations, and individuals may have a technical basis for making decisions on the use of flood-prone areas. The Delaware River Basin Commission and the U. S. Geological Survey regard this program of flood-plain-inundation studies as a positive step toward flood-damage prevention. Flood-plaininundation studies are a prerequisite to flood-plain management which may include a mixture of flood-control structures and/or land-use regulations. Both physical works and flood-plain regulations are included in the Comprehensive Plan for development of the Delaware River basin, of which the Schuylkill River is a part. Recommendations for land use, or suggestions for limitations of land use, are not made herein. Other reports on use and regulation of land in flood-prone areas are available (Dola, 1961; White, 1961; American Society of Civil Engineers Task Force on Flood Plain Regulations, 1962; and Goddard, 1963). The primary responsibility for planning for optimum land use in the flood plain and the implementation of flood-plain zoning or other regulations to achieve such optimum use rests with State, and local interests.
Preface: Bridging the gap between theory and practice on the upper Mississippi River
Lubinski, Kenneth S.
1995-01-01
In July 1994, the Upper Mississippi River (UMR) served as a nexus for coalescing scientific information and management issues related to worldwide floodplain river ecosystems. The objective of the conference ‘Sustaining the Ecological Integrity of Large Floodplain Rivers: Application of Ecological Knowledge to River Management’, was to provide presentations of current ideas from the scientific community. To translate the many lessons learned on other river systems to operational decisions on the UMR, a companion workshop for managers and the general public was held immediately after the conference.An immediate local need for such sharing has existed for several years, as the U.S. Corps of Engineers is currently planning commercial navigation activities that will influence the ecological integrity of the river over the next half century. Recently, other equally important management issues have surfaced, including managing the river as an element of the watershed, and assessing its ecological value as a system instead of a collection of parts (Upper Mississippi River Conservation Committee, 1993). Regional and state natural resource agencies are becoming more convinced that they need to address these issues within their own authorities, however spatially limited, rather than relying on the U.S. Corps of Engineers to manage the ecosystem as an adjunct to its purpose of navigation support.
Carbon storage in the Mississippi River delta enhanced by environmental engineering
NASA Astrophysics Data System (ADS)
Shields, Michael R.; Bianchi, Thomas S.; Mohrig, David; Hutchings, Jack A.; Kenney, William F.; Kolker, Alexander S.; Curtis, Jason H.
2017-11-01
River deltas have contributed to atmospheric carbon regulation throughout Earth history, but functioning in the modern era has been impaired by reduced sediment loads, altered hydrologic regimes, increased global sea-level rise and accelerated subsidence. Delta restoration involves environmental engineering via river diversions, which utilize self-organizing processes to create prograding deltas. Here we analyse sediment cores from Wax Lake delta, a product of environmental engineering, to quantify the burial of organic carbon. We find that, despite relatively low concentrations of organic carbon measured in the cores (about 0.4%), the accumulation of about 3 T m-2 of sediment over the approximate 60 years of delta building resulted in the burial of a significant amount of organic carbon (16 kg m-2). This equates to an apparent organic carbon accumulation rate of 250 +/- 23 g m-2 yr-1, which implicitly includes losses by carbon emissions and erosion. Our estimated accumulation rate for Wax Lake delta is substantially greater than previous estimates based on the top metre of delta sediments and comparable to those of coastal mangrove and marsh habitats. The sedimentation of carbon at the Wax Lake delta demonstrates the capacity of engineered river diversions to enhance both coastal accretion and carbon burial.
The Huntington District of the U.S. Army Corps of Engineers, in collaboration with the Ohio River Basin Alliance, the Institute for Water Resources, the Great Lakes and Ohio River Division, and numerous other Federal agencies, non-governmental organizations, research institutions...
Southwest Washington coastal erosion workshop report 2000
Gelfenbaum, Guy; Kaminsky, George M.
2002-01-01
This report is a compilation of abstracts that correspond to oral presentations and posters presented at the fifth principal investigators workshop of the Southwest Washington Coastal Erosion Study. The workshop was held November 15 - 17, 2000 at the Department of Ecology headquarters building in Olympia, WA. For the fourth consecutive year in November, the workshop convened the entire multi-disciplinary group of scientists and engineers working on the Study or on related projects within the Columbia River littoral cell (CRLC) (Figures 1 and 2). The workshop participants are listed in the List of Attendees section towards the end of this report. The purpose of this workshop was to bring all Study investigators and associated engineers and scientists together to discuss recent work, ongoing tasks, and future research plans in the CRLC. Investigators were asked to present recent data, preliminary interpretations, and research results to invoke discussion and correlation with parallel scientific efforts. The abstracts compiled in this report represent a wealth of information on the CRLC, but because much of the work is in progress, the reader is advised that the information provided herein is preliminary and subject to change.
Storm-rhine -simulation Tool For River Management
NASA Astrophysics Data System (ADS)
Heun, J. C.; Schotanus, T. D.; de Groen, M. M.; Werner, M.
The Simulation Tool for River Management (STORM), based on the River Rhine case, aims to provide insight into river and floodplain management, by (1) raising aware- ness of river functions, (2) exploring alternative strategies, (3) showing the links be- tween natural processes, spatial planning, engineering interventions, river functions and stakeholder interests, (4) facilitating the debate between different policy makers and stakeholders from across the basin and (5) enhancing co-operation and mutual un- derstanding. The simulation game is built around the new concepts of SRoom for the & cedil;RiverT, Flood Retention Areas, Resurrection of former River Channels and SLiving & cedil;with the FloodsT. The Game focuses on the Lower and Middle Rhine from the Dutch Delta to Maxau in Germany. Influences from outside the area are included as scenarios for boundary conditions. The heart of the tool is the hydraulic module, which calcu- lates representative high- and low water-levels for different hydrological scenarios and influenced by river engineering measures and physical planning in the floodplains. The water levels are translated in flood risks, navigation potential, nature development and land use opportunities in the floodplain. Players of the Game represent the institutions: National, Regional, Municipal Government and Interest Organisations, with interests in flood protection, navigation, agriculture, urban expansion, mining and nature. Play- ers take typical river and floodplain engineering, physical planning and administrative measures to pursue their interests in specific river functions. The players are linked by institutional arrangements and budgetary constraints. The game particularly aims at middle and higher level staff of local and regional government, water boards and members of interest groups from across the basin, who deal with particular stretches or functions of the river but who need (1) to be better aware of the integrated whole, (2) to understand the interests and considerations of others and (3) to experience the mu- tual benefits of co-operation. There is potential for using the game as one of the tools in support of interactive formulation of policy and participatory decision-making in actual plans.
NASA Astrophysics Data System (ADS)
Smith, James; Rice, Stephen; Hodgkins, Richard
2017-04-01
Despite increasing recognition that animals play important roles in geomorphological systems (zoogeomorphology), with important ecological implications for the animals and their ecosystems (ecosystem engineering), sediment transport continues to be regarded as an abiotic process. This research challenges that orthodoxy by investigating the biotic processes associated with bioturbation in rivers caused by feeding bream (Abramis brama (L.)) and quantifying their impact on fine sediment suspension and sediment yield. Experiments in lakes have demonstrated that bream negatively influence ecosystem dynamics through bottom up mechanisms as a result of physical bioturbation caused by benthivorous feeding. Although this level of bioturbation, and thus sediment entrainment, can alter the fundamental biogeochemical cycles and food web dynamics in lentic ecosystems, research is yet to assess this potential effect in riverine ecosystems or evaluate this bioturbation mechanism as a driver of fluvial sediment flux - even though they are common in rivers across mainland Europe. A series of ex-situ mesocosm experiments have investigated the controls of fine sediment entrainment by bream, assessing the roles of both biomass (size and number) and food density on suspended sediment concentration and turbidity. Bream create large volumes of suspended sediment during feeding (highest recorded turbidity 1172 NTU) and there are significant (p < 0.001) increases in turbidity associated with each experimental parameter: number of fish, fish size and food density. Supplementary experiments have assessed bream as ecosystem engineers in the presence of the congener species, roach (Rutilus rutilus (L.)), which share the same ecological niche. In the presence of roach, the impact of bream on turbidity increased by an average of 120% (6.6 NTU to 15 NTU) and increased further at the 90th percentile by 240% (32 NTU to 110 NTU). In light of these findings, the extensive geographical distribution of bream and the observation that shoals of bream commonly exceed one thousand individuals, it is plausible that bream are an important biological constituent of the fine sediment cascade within riverine systems. Complementary field work is underway to quantify the frequency-magnitude characteristics of the fine sediment plumes that feeding shoals of bream generate in lowland UK rivers.
NASA Astrophysics Data System (ADS)
Foster, B.; Characklis, G. W.; Thurman, W. N.
2015-12-01
In mid 2012, a severe drought swept across the Midwest, the heartland of corn production in the U.S. When the drought persisted into late Fall, corn markets were affected in two distinct ways: (1) reduced rainfall led to projected and actual corn yields that were lower than expected and (2) navigation restrictions, a result of low water levels on the Mississippi River, disrupted barge transportation, the most common and inexpensive mode for moving corn to many markets. Both (1) and (2) led to significant financial losses, but due to the complexity of the economic system and the coincidence of two different market impacts, the size of the role that low water levels played wass unclear. This is important, as losses related to low water levels are used to justify substantial investments in dredging activities on the Mississippi River. An "engineering" model of the system, suggests that low water levels should drive large increases in barge and corn prices, while some econometric models suggest that water levels explain very little of the changes in barge rates and corn prices. Employing a model that integrates both the engineering and economic elements of the system indicates that corn prices and barge rates during the drought display spatial and temporal behavior that is difficult to explain using either the engineering or econometric models alone. This integrated model accounts for geographic and temporal variations in drought impacts and identifies unique market responses to four different sets of conditions over the drought's length. Results illustrate that corn and barge price responses during the drought were a product of comingled, but distinct, reactions to both supply changes and navigation disruptions. Results also provide a more structured description of how the economic system that governs corn allocation interacts with the Mississippi River system during drought. As both public and private parties discuss potential managerial or infrastructural methods for keeping shipping channels open during drought, the results of this work should help them to decide how different interventions might benefit or hurt barge operators and/or corn sellers.
1978-01-01
consequently accelerating the drainage of surface water into the Mississippi and its tributaries. 16 77 Although he considered levees responsible for the ...creation of the Mississippi River Commission in 1879. Its assigned functions included making surveys, plans, and estimates for improve- ments to "correct...along those great transportation arteries, St. Louis continues to depend on waterborne commerce for a large measure
K.L. Hatcher; J.A. Jones
2013-01-01
Large river basins transfer the water signal from the atmosphere to the ocean. Climate change is widely expected to alter streamflow and potentially disrupt water management systems. We tested the ecological resilienceâcapacity of headwater ecosystems to sustain streamflow under climate changeâand the engineering resilienceâcapacity of dam and reservoir management to...
Application of ELJ to create and maintain side channels in a dynamic gravel bed river
NASA Astrophysics Data System (ADS)
Crabbe, E.; Crowe Curran, J.; Ockelford, A.
2017-12-01
Braided and anastomosing rivers create and maintain a large amount of side channel habitat. Unfortunately, many rivers that were once multi-channel rivers have been constrained to single thread channels as a consequence of land use changes that occurred in the 19th and 20th centuries or earlier. An increasingly common management goal today is the re-creation of self-maintaining side and tributary habitat through as natural means as possible. This work examines the geomorphic history of one such channel and the success of recent rehabilitation efforts. Our case study comes from the South Fork Nooksack River in the Cascades Range in Washington State. The Nooksack River is a gravel and sand bed channel with a snowmelt dominated hydrograph. Engineered log jams (ELJ) have been employed to direct flow into side and chute channels with the larger goals of increasing overall channel complexity and salmon spawning opportunities. ELJs have been constructed on the channel since the 2000s, and the ELJs in the study reaches range in age up to 10 years. The size and design of individual jams within the reach vary, enabling a comparison between jam types. ELJs are evaluated for their ability to maintain gravel bar locations and open tributary channels through the snowmelt season over the reach scale. Additional goals of trapping wood onto the jams and existing bars, stabilizing channel banks, and allowing for the growth of bar vegetation are also examined.
River-Based Experiential Learning: the Bear River Fellows Program
NASA Astrophysics Data System (ADS)
Rosenberg, D. E.; Shirley, B.; Roark, M. F.
2012-12-01
The Department of Civil and Environmental Engineering, Outdoor Recreation, and Parks and Recreation programs at Utah State University (USU) have partnered to offer a new, unique river-based experiential learning opportunity for undergraduates called the Bear River Fellows Program. The program allows incoming freshmen Fellows to experience a river first hand during a 5-day/4-night river trip on the nearby Bear River two weeks before the start of their first Fall semester. As part of the program, Fellows will navigate the Bear River in canoes, camp along the banks, interact with local water and environmental managers, collect channel cross section, stream flow, vegetation cover, and topological complexity data, meet other incoming freshmen, interact with faculty and graduate students, develop boating and leadership skills, problem solve, and participate as full members of the trip team. Subsequently, Fellows will get paid as undergraduate researchers during their Fall and Spring Freshman semesters to analyze, synthesize, and present the field data they collect. The program is a collaborative effort between two USU academic units and the (non-academic) division of Student Services and supports a larger National Science Foundation funded environmental modelling and management project for the lower Bear River, Utah watershed. We have advertised the program via Facebook and emails to incoming USU freshmen, received 35 applications (60% women), and accepted 5 Fellows into the program (3 female and 2 male). The river trip departs August 14, 2012. The poster will overview the Bear River Fellows Program and present qualitative and preliminary outcomes emerging from the trip and Fellows' work through the Fall semester with the field data they collect. We will also undertake more rigorous and longer longitudinal quantitative evaluation of Program outcomes (for example, in problem-solving and leadership) both in Spring 2013 and in subsequent 2013 and 2014 offerings of the program.
Goldstein, F.J.; Weight, W.D.
1982-01-01
The Idaho National Engineering Laboratory (INEL) covers about 890 square miles of the eastern Snake River Plain, in southeastern Idaho. The eastern Snake River Plain is a structural basin which has been filled with thin basaltic lava flows, rhyolitic deposits, and interbedded sediments. These rocks form an extensive ground-water reservoir known as the Snake River Plain aquifer. Six wells were drilled and two existing wells were deepened at the INEL from 1969 through 1974. Interpretation of data from the drilling program confirms that the subsurface is dominated by basalt flows interbedded with layers of sediment, cinders, and silicic volcanic rocks. Water levels in the wells show cyclic seasonal fluctuations of maximum water levels in winter and minimum water levels in mid-summer. Water levels in three wells near the Big Lost River respond to changes in recharge to the Snake River Plain aquifer from the Big Lost River. Measured water levels in multiple piezometers in one well indicate increasing pressure heads with depth. A marked decline in water levels in the wells since 1977 is attributed to a lack of recharge to the Snake River Plain aquifer.
This study evaluates the impacts of future land use changes on flooding in the Kansas River Basin. It also studies the impacts of wetlands on flood reduction. The study presents Hydrologic Engineering Centers-Hydrologic Modeling System (HEC-HMS) based runoff modeling and River A...
How great a thirst? Assembling a river restoration toolkit
Steve Harris
1999-01-01
The Rio Grande River's biologically troubled status is clearly linked to present and historic water management. To restore the river to pre-settlement conditions will take a "tool kit" that holds authorities, knowledge, and skills needed to correct historical neglect and abuse. Tools include awareness, planning, partnerships, engineering solutions, and a...
A framework for evaluating disciplinary contributions to river restoration
G. E. Grant
2008-01-01
As river restoration has matured into a global-scale intervention in rivers, a broader range of technical disciplines are informing restoration goals, strategies, approaches, and methods. The ecological, geomotphological, hydrological, and engineering sciences each bring a distinct focus and set of perspectives and tools, and are themselves embedded in a larger context...
33 CFR 207.170 - Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level. 207.170 Section 207.170 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.170 Federal Dam, Oklawaha River...
33 CFR 207.170 - Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level. 207.170 Section 207.170 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.170 Federal Dam, Oklawaha River...
33 CFR 207.170 - Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Federal Dam, Oklawaha River, Moss Bluff, Fla.; pool level. 207.170 Section 207.170 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.170 Federal Dam, Oklawaha River...
High-fidelity numerical modeling of the Upper Mississippi River under extreme flood condition
NASA Astrophysics Data System (ADS)
Khosronejad, Ali; Le, Trung; DeWall, Petra; Bartelt, Nicole; Woldeamlak, Solomon; Yang, Xiaolei; Sotiropoulos, Fotis
2016-12-01
We present data-driven numerical simulations of extreme flooding in a large-scale river coupling coherent-structure resolving hydrodynamics with bed morphodynamics under live-bed conditions. The study area is a ∼ 3.2 km long and ∼ 300 m wide reach of the Upper Mississippi River, near Minneapolis MN, which contains several natural islands and man-made hydraulic structures. We employ the large-eddy simulation (LES) and bed-morphodynamic modules of the Virtual Flow Simulator (VFS-Rivers) model, a recently developed in-house code, to investigate the flow and bed evolution of the river during a 100-year flood event. The coupling of the two modules is carried out via a fluid-structure interaction approach using a nested domain approach to enhance the resolution of bridge scour predictions. We integrate data from airborne Light Detection and Ranging (LiDAR), sub-aqueous sonar apparatus on-board a boat and in-situ laser scanners to construct a digital elevation model of the river bathymetry and surrounding flood plain, including islands and bridge piers. A field campaign under base-flow condition is also carried out to collect mean flow measurements via Acoustic Doppler Current Profiler (ADCP) to validate the hydrodynamic module of the VFS-Rivers model. Our simulation results for the bed evolution of the river under the 100-year flood reveal complex sediment transport dynamics near the bridge piers consisting of both scour and refilling events due to the continuous passage of sand dunes. We find that the scour depth near the bridge piers can reach to a maximum of ∼ 9 m. The data-driven simulation strategy we present in this work exemplifies a practical simulation-based-engineering-approach to investigate the resilience of infrastructures to extreme flood events in intricate field-scale riverine systems.
1. Front view of steam engine and mill, looking NE, ...
1. Front view of steam engine and mill, looking NE, showing (l to r) 6-column beam engine, flywheel, reduction gears and 3-roll cane mill. - Hacienda Azucarera La Esperanza, Steam Engine & Mill, 2.65 Mi. N of PR Rt. 2 Bridge over Manati River, Manati, Manati Municipio, PR
Global Analysis of River Planform Change using the Google Earth Engine
NASA Astrophysics Data System (ADS)
Bryk, A.; Dietrich, W. E.; Gorelick, N.; Sargent, R.; Braudrick, C. A.
2014-12-01
Geomorphologists have historically tracked river dynamics using a combination of maps, aerial photographs, and the stratigraphic record. Although stratigraphic records can extend into deep time, maps and aerial photographs often confine our record of change to sparse measurements over the last ~80 years and in some cases much less time. For the first time Google's Earth Engine (GEE) cloud based platform allows researchers the means to analyze quantitatively the pattern and pace of river channel change over the last 30 years with high temporal resolution across the entire planet. The GEE provides an application programing interface (API) that enables quantitative analysis of various data sets including the entire Landsat L1T archive. This allows change detection for channels wider than about 150 m over 30 years of successive, georeferenced imagery. Qualitatively, it becomes immediately evident that the pace of channel morphodynamics for similar planforms varies by orders of magnitude across the planet and downstream along individual rivers. To quantify these rates of change and to explore their controls we have developed methods for differentiating channels from floodplain along large alluvial rivers. We introduce a new metric of morphodynamics: the ratio of eroded area to channel area per unit time, referred to as "M". We also keep track of depositional areas resulting from channel shifting. To date our quantitative analysis has focused on rivers in the Andean foreland. Our analysis shows channel bank erosion rates, M, varies by orders of magnitude for these rivers, from 0 to ~0.25 yr-1, yet these rivers have essentially identical curvature and sinuosity and are visually indistinguishable. By tracking both bank paths in time, we find that, for some meandering rivers, a significant fraction of new floodplain is produced through outer-bank accretion rather than point bar deposition. This process is perhaps more important in generating floodplain stratigraphy than previously recognized. These initial findings indicate a new set of quantitative observations will emerge to further test and advance morphodynamic theory. The Google Earth Engine offers the opportunity to explore river morphodynamics on an unprecedented scale and provides a powerful tool for addressing fundamental questions in river morphodynamics.
NASA Astrophysics Data System (ADS)
Jugie, Marion; Gob, Frédéric; Slawson, Deborah; Le-Coeur, Charles
2014-05-01
The EU Water Framework Directive (WFD, October 2000) mandated that the Member States of the European Union achieve the general objective of protection of aquatic ecology by 2015. European rivers and streams have to attain "good ecological status" through the preservation and restoration of aquatic environments. Member will have to ensure environmental continuity through "the adequate distribution of fish species and transport of sediments". In France, more than 61,000 transverse structures - mill dams, weirs, diversion gates - have been identified on rivers as being obstacles to ecological and sedimentary continuity. Because of their historical occupation by societies, rivers flowing in the Paris area have long been anthropized and artificialized. River courses, channel shape, sediment transport and hydrological regime modifications have tremendously transformed the hydrosystems surrounding the city of Paris. The Merantaise's catchment is one of this low energy river watershed, near Paris, that have been modified by historical engineering, especially during medieval-modern times and by the building of the Versailles Castle (XVIIth century). The hydraulic infrastructures are still there and impact the hydromorphogical conditions of the river (incision, lateral erosion, …). In addition to these ancient pressures a rapid and massive urbanization of the suburban areas has applied a new type of constraint to the hydrosystems in recent decades. This undermines the balance that was established following ancient engineering and disturbs the current functioning of the valley. These new types of land occupation have significantly altered the ecological circumstances and transformed the hydrological responses of rivers. In this study, we therefore seek to understand these processes of successive adjustments (ancient and recent) of a small river from the urban margins of the Orge watershed (to the south of Paris). We use a multi-scalar spatial and temporal approach to reconstruct the hydromorphological circumstances ancient and current, by hydrological chronicles and archives documentation.
Chase, Katherine J.
2014-01-01
Major floods in 1996 and 1997 intensified public debate about the effects of human activities on the Yellowstone River. In 1999, the Yellowstone River Conservation District Council was formed to address conservation issues on the river. The Yellowstone River Conservation District Council partnered with the U.S. Army Corps of Engineers to carry out a cumulative effects study on the main stem of the Yellowstone River. The cumulative effects study is intended to provide a basis for future management decisions within the watershed. Streamflow statistics, such as flow-frequency data calculated for unregulated and regulated streamflow conditions, are a necessary component of the cumulative effects study. The U.S. Geological Survey, in cooperation with the Yellowstone River Conservation District Council and the U.S. Army Corps of Engineers, calculated low-flow frequency data and general monthly and annual statistics for unregulated and regulated streamflow conditions for the Upper Yellowstone and Bighorn Rivers for the 1928–2002 study period; these data are presented in this report. Unregulated streamflow represents flow conditions during the 1928–2002 study period if there had been no water-resources development in the Yellowstone River Basin. Regulated streamflow represents estimates of flow conditions during the 1928–2002 study period if the level of water-resources development existing in 2002 was in place during the entire study period.
Education in Engineering and Ecohydrology for Fish Passage
NASA Astrophysics Data System (ADS)
Ahlfeld, D.; Towler, B.
2011-12-01
Historical fish migration routes linking feeding and spawning habitats have been significantly impacted by culverts, dikes, dams, and other barriers on waterways throughout the world. For example an estimated 2.5 million barriers to fish migration exist in the United States. In recent years, there has been an increased focus on removing or mitigating these barriers as an efficient mechanism to restore habitat. Effective design and implementation of these measures requires specialists with skills at the intersection of engineering, hydrology and biology. Recognizing the need for a cadre of engineers with the additional skills in hydraulics and ecohydrology needed to analyze and design solutions for enhancing fish passage in streams and rivers, the University of Massachusetts Amherst now offers a Master of Science in Civil Engineering (MSCE) degree with a specialization in Fish Passage Engineering. The curriculum is offered in conjunction with the U.S. Fish and Wildlife Service and is informed by the recommendations of the Curriculum Working Group of the Bioengineering Section of the American Fisheries Society. The curriculum is offered through the Department of Civil and Environmental Engineering. This presentation will describe the motivation for the degree, the content of coursework and the challenges inherent in developing an interdisciplinary education program spanning biogeosciences and engineering.
Corrosion engineering in the utilization of the Raft River geothermal resource
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miller, R.L.
1976-08-01
The economic impact of corrosion and the particular problems of corrosion in the utilization of geothermal energy resources are noted. Corrosion is defined and the parameters that control corrosion in geothermal systems are discussed. A general background of corrosion is presented in the context of the various forms of corrosion, in relation to the Raft River geothermal system. A basic reference for mechanical design engineers involved in the design of geothermal energy recovery systems is provided.
Geology of the Canyon Reservoir site on the Guadalupe River, Comal County, Texas
George, William O.; Welder, Frank A.
1955-01-01
In response to a request by Colonel Harry O. Fisher, District Engineer of the Fort Worth District of the Corps of Engineers, United States Army (letter of Dec. 13, 1954), a reconnaissance investigation was made of the geology of the Canyon (F-1) reservoir site on the Guadalupe River in Comal County, Tex. The purpose of the investigation was to study the geology in relation to possible leakage - particularly leakage of water that might then be lost from the drainage area of the Guadalupe River - and to add to the general knowledge of the ground-water hydrology of the San Antonio area. The dam (F-1) was originally designed for flood control and conservation only, with provision for the addition of a power unit if feasible. Since the completion of the investigation by the Corps of Engineers, the city of San Antonio has expressed an interest in the reservoir as a possible source of public water supply. The Corps of Engineers has made a thorough engineering and geologic study of the dam site (Corps of Engineers, 1950), which has Congressional approval. The geology and water resources of Comal County have been studied by George (1952). The rocks studied are those within the reservoir area and generally below the 1,000-foot contour as shown on the Smithson Valley quadrangle of the U.S. Geological Survey.
1991-06-01
WE’RE PROUD M TO SIGN US Army Corps OUR WORK *of Engineers RoCk Wand Dd EXECUTIVE SUMMARY Lake Chautauqua is a 3,250-acre floodplain lake and wetland...Since 1978, there has been a documented, long-term decline in both the annual fall peak number of ducks in the refuge and the total fall use days. The...habitat value assessment methodologies. Aquatic models developed by the Waterways Experiment Station (WES) were used to evaluate existing aquatic and
1977-07-01
Paragraph Title Page SECTION 1 INTRODUCTION 1-01 Authority and Scope 1 1-02 Construction History 1 ’ 1-03 Inspection and Evaluation 1 SECTION 2 SIXTH...Report No. 6 SECTION 1 INTRODUCTION 1-01. AUTHORITY AND SCOPE. This report has been prepared in accordance with Engineer Regulation 1110-2-100 entitled...DATA ___________.. ... ..._____1975-1976 PLATE 4 t iZ .. .4 7 ....T . . jAUG . - SEPT - OCT’ NOV DE( -AN . FED MAR i’- o~y d!1 I -4 WEI IIi OZ [ 011. u
1990-09-01
TELEPHONE (Include Area Code) 22c OFFICE SYMBOL WILLIAM J. HANSEN (703) 355-3089 CEWRC-IWR-R DD FORM 1473, 84 MAR 83 APR edition may be used until... William J. Hansen of the Institute for Water Resources was the Technical Study Manager. Mr. L. Leigh Skaggs of the Institute for Water Resources...Mr. William Thornton, Missouri River Division, Mr. Bruce Hardie, Southwestern Division and Mr. Allen Summers, North Pacific Division. U.S. ARMY
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... of Engineers' scheduled maintenance shutdown of Barrier IIB. During the enforcement period, entry...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... the U.S. Army Corps of Engineers' maintenance operations of dispersal barrier IIB. During these...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... Corps of Engineers' post-maintenance testing of Barrier IIA and IIB. During the enforcement period...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2013 CFR
2013-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2012 CFR
2012-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2014 CFR
2014-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 334.440 - New River, N.C., and vicinity; Marine Corps firing ranges.
Code of Federal Regulations, 2011 CFR
2011-07-01
...; Marine Corps firing ranges. 334.440 Section 334.440 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.C., and vicinity; Marine Corps firing ranges. (a) Atlantic Ocean east of New River Inlet. The... section are referred to true meridian. (b) New River. The firing ranges include all waters to the high...
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Mississippi River Water Control Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This...
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Mississippi River Water Control Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This...
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing detail of floor beam at central pier, half section of cantilever slab at end of bridge, floor beam end panels, slab reinforcing, plan of slab reinforcing, diagram of slab bars, typical floor girder. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
Historical Sediment Sources and Delivery on the Lower Mississippi River
NASA Astrophysics Data System (ADS)
Dahl, T. A.; Biedenharn, D. S.; Little, C. D.
2015-12-01
The development of the Lower Mississippi River (LMR) and its floodplain for navigation and flood control has been ongoing since the 18th century, with the most concerted efforts occurring as a result of the Flood Control Act (FCA) of 1928 following the Great Flood of 1927. The Mississippi River and Tributaries (MR&T) Project that was spawned from the FCA of 1928 has produced a massive, comprehensive system for flood control and channel stabilization that includes levees, channel improvements, and floodways, as well as tributary reservoirs and other basin improvements. Additionally, the development of the river for safe and dependable navigation has generated a substantial engineering effort involving river training structures, meander cutoffs, and dredging. The historical, and present-day morphology of the LMR reflects an integration of all these engineering interventions (and the process-responses they have triggered in the fluvial system), combined with natural drivers of channel change and evolution, including floods and droughts, hurricanes, neotectonic activity, geologic outcrops, climate change, and relative sea-level rise. In response to the complex requirements in navigation, flood risk reduction, and environmental restoration, all with multiple stakeholders, the U.S. Army Corps of Engineers created the Mississippi River Geomorphology & Potamology (MRG&P) Program. The goals of the MRG&P are to advance the knowledge of the geomorphology of the LMR and to transfer this technology to improve and sustain long-term management of the system. The results presented herein come from several MRG&P studies. The historical river morphology, and particularly the sources and delivery of sediments have changed dramatically over the past two centuries. In this presentation, the changes in sediment sources, and the manner in which this sediment is delivered through the channel system from the early 1800s to present-day is described.
The human role in changing river channels
NASA Astrophysics Data System (ADS)
Gregory, K. J.
2006-09-01
Direct consequences of the human role, where human activity affects river channels through engineering works including channelization, dam construction, diversion and culverting, have been long recognised [Marsh, G.P., 1864. Man and Nature or Physical Geography as Modified by Human Action. Charles Scribner, New York; Thomas Jr., W.L., (ed.) 1956. Man's Role in Changing the Face of the Earth. Chicago, University of Chicago Press, Chicago.]. The less obvious indirect effects of point and reach changes occurring downstream and throughout the basin, however, are much more recently appreciated, dating from key contributions by Strahler [Strahler, A.N., 1956. The nature of induced erosion and aggradation. In W. L. Thomas (Ed.), Man's Role in Changing the Face of the Earth. University of Chicago Press, Chicago, 621-638.], Wolman [Wolman, M.G., 1967. A cycle of sedimentation and erosion in urban river channels. Geografiska Annaler 49A, 385-95.], Schumm [Schumm, S.A., 1969. River metamorphosis. Proceedings American Society of Civil Engineers, Journal Hydraulics Division 95, 255-73.], and Graf [Graf, W.L., 1977. The rate law in fluvial geomorphology. American Journal of Science, 277, 178-191.]. These are complemented by effects of alterations of land use, such as deforestation, intensive agriculture and incidence of fire, with the most extreme effects produced by building activity and urbanisation. Changing river channels are most evident in the channel cross-section where changes of size, shape and composition are now well-established, with up to tenfold increases or decreases illustrated by results from more than 200 world studies. In addition the overall channel planform, the network and the ecology have changed. Specific terms have become associated with changing river channels including enlargement, shrinkage and metamorphosis. Although the scope of adjustment has been established, it has not always been possible to predict what will happen in a particular location, because of complex response and contingency. The ways in which changes in cross-section relate to reach and network changes are less clear, despite investigations showing the distribution of changes along segmented channels. When considering the human role in relation to changing river channels, at least five challenges persist. First, because prediction of the nature and amount of likely change at a particular location is not certain, and because the contrasting responses of humid and arid systems needs to be considered, modelling is required to reduce uncertainty, as was first emphasised by Burkham [Burkham, D.E., 1981. Uncertainties resulting from changes in river form. American Society Civil Engineers Proceedings, Journal Hydraulics Division 107, 593-610.]. Second, feedback effects incorporated within the relationship between changes at channel, reach and network scales can have considerable implications, especially because changes now evident may have occurred, or have been initiated, under different environmental conditions. Third, consideration of global climate change is imperative when considering channel sensitivity and responses to threshold conditions. Fourth, channel design involving geomorphology should now be an integral part of restoration procedures. This requires, fifthly, greater awareness of different cultures as a basis for understanding constraints imposed by legislative frameworks. Better understanding of the ways in which the perception of the human role in changing river channels varies with culture as well as varying over time should enhance application of design for river channel landscapes.
NASA Astrophysics Data System (ADS)
Wang, Houjie; Wu, Xiao; Bi, Naishuang; Li, Song; Yuan, Ping; Wang, Aimei; Syvitski, James P. M.; Saito, Yoshiki; Yang, Zuosheng; Liu, Sumei; Nittrouer, Jeffrey
2017-10-01
The water-sediment regulation scheme (WSRS), beginning in 2002, is an unprecedented engineering effort to manage the Yellow River with the aims to mitigate the siltation both in the lower river channel and within the Xiaolangdi Reservoir utilizing the dam-regulated flood water. Ten years after its initial implementation, multi-disciplinary indicators allow us to offer a comprehensive review of this human intervention on a river-coastal system. The WSRS generally achieved its objective, including bed erosion in the lower reaches with increasing capacity for flood discharge and the mitigation of reservoir siltation. However, the WSRS presented unexpected disturbances on the delta and coastal system. Increasing grain size of suspended sediment and decreasing suspended sediment concentration at the river mouth resulted in a regime shift of sediment transport patterns that enhanced the disequilibrium of the delta. The WSRS induced an impulse delivery of nutrients and pollutants within a short period ( 20 days), which together with the altered hydrological cycle, impacted the estuarine and coastal ecosystem. We expect that the sediment yield from the loess region in the future will decrease due to soil-conservation practices, and the lower channel erosion will also decrease as the riverbed armors with coarser sediment. These, in combination with uncertain water discharge concomitant with climate change, increasing water demands and delta subsidence, will put the delta and coastal ocean at high environmental risks. In the context of global change, this work depicts a scenario of human impacts in the river basin that were transferred along the hydrological pathway to the coastal system and remotely transformed the different components of coastal environment. The synthesis review of the WSRS indicates that an integrated management of the river-coast continuum is crucially important for the sustainability of the entire river-delta system. The lessons learned from the WSRS in the Yellow River provide insights to the integrated management of large rivers worldwide.
Derivation and Application of Idealized Flow Conditions in River Network Simulation
NASA Astrophysics Data System (ADS)
Afshari Tork, S.; Fekete, B. M.
2015-12-01
Stream flow information is essential for many applications across broad range of scales, e.g. global water balances, engineering design, flood forecasting, environmental management, etc. Quantitative assessment of flow dynamics of natural streams, requires detailed knowledge of all the geometrical and geophysical variables (e.g. bed-slope, bed roughness, etc.) along river reaches. Simplifying the river bed geometries could reduce both the computational burden implementing flow simulations and challenges in assembling the required data, especially for large domains. Average flow conditions expressed as empirical "at-a-station" hydraulic geometry relationships between key channel components, (i.e. water depth, top-width, flow velocity, flow area against discharge) have been studied since 60's. Recent works demonstrated that power-function as idealized riverbed geometry whose parameters are correlated to those of exponential relationship between mean water depth and top-width, are consistent with empirical "at-a-station" relations.US Geological Surveys' National Water Information System web-interface provides huge amount of river discharge and corresponding stage height data from several thousands of streamflow monitoring stations over United States accompanied by river survey summaries providing additional flow informations (width, mean velocity, cross-sectional area). We conducted a series of analyses to indentify consistent data daily monitoring and corresponding survey records that are suitable to refine our current understanding of how the "at-a-station" properties of river channels relate to channel forming characteristics (e.g. riverbed slope, flow regime, geology, etc.). The resulting ~1,200 actively operating USGS stations with over ~225,000 corresponding survery records (almost 200 survey per gauge on average) is the largest river survey database ever studied in the past.Our presentation will show our process assembling our river monitoring and survey data base and we will present our first results translating "at-a-station" relations into he hydraulic geometry of river channels based on idealized power-law riverbed geometries. We also will also present a series of application (e.g. improved flow rounting, simplyfied river surveying).
Sele coastal plain flood risk due to wave storm and river flow interaction
NASA Astrophysics Data System (ADS)
Benassai, Guido; Aucelli, Pietro; Di Paola, Gianluigi; Della Morte, Renata; Cozzolino, Luca; Rizzo, Angela
2016-04-01
Wind waves, elevated water levels and river discharge can cause flooding in low-lying coastal areas, where the water level is the interaction between wave storm elevated water levels and river flow interaction. The factors driving the potential flood risk include weather conditions, river water stage and storm surge. These data are required to obtain inputs to run the hydrological model used to evaluate the water surface level during ordinary and extreme events regarding both the fluvial overflow and storm surge at the river mouth. In this paper we studied the interaction between the sea level variation and the river hydraulics in order to assess the location of the river floods in the Sele coastal plain. The wave data were acquired from the wave buoy of Ponza, while the water level data needed to assess the sea level variation were recorded by the tide gauge of Salerno. The water stages, river discharges and rating curves for Sele river were provided by Italian Hydrographic Service (Servizio Idrografico e Mareografico Nazionale, SIMN).We used the dataset of Albanella station (40°29'34.30"N, 15°00'44.30"E), located around 7 km from the river mouth. The extreme river discharges were evaluated through the Weibull equation, which were associated with their return period (TR). The steady state river water levels were evaluated through HEC-RAS 4.0 model, developed by Hydrologic Engineering Center (HEC) of the United States Army Corps of Engineers Hydrologic Engineering Center (USACE,2006). It is a well-known 1D model that computes water surface elevation (WSE) and velocity at discrete cross-sections by solving continuity, energy and flow resistance (e.g., Manning) equation. Data requirements for HEC-RAS include topographic information in the form of a series of cross-sections, friction parameter in the form of Manning's n values across each cross-section, and flow data including flow rates, flow change locations, and boundary conditions. For a steady state sub-critical simulation, the boundary condition is a known downstream WSE, in this case the elevated water level due to wave setup, wind setup and inverted barometer, while the upstream boundary condition consisted in WSE corresponding to river discharges associated to different return periods. The results of the simulations evidence, for the last 10 kilometers of the river, the burst of critical inundation scenarios even with moderate flow discharge, if associated with concurrent storm surge which increase the water level at the river mouth, obstructing normal flow discharge.
Community and Institutional Adaptation to Riverbank Erosion along the Jamuna River, Bangladesh
NASA Astrophysics Data System (ADS)
Ali, F. M. M.
2009-04-01
The paper examines adaptation to the river erosion hazard in Bangladesh through its most exacting river, the braided Jamuna. The Jamuna River has destroyed and continues to threaten significant areas of settlements, farmed land and infrastructure. Local communities experience a social disintegration and pauperisation which lasts for generations. Although advanced for several decades, the public engineering effort to mitigate the erosion is piecemeal and has had limited success to date. The research takes an interdisciplinary approach to the hazard, in both content and method. Using Remote Sensing data to distinguish regions of dormant, explosive, minimal and constant erosion, the physical morphology of the river is linked to the community adaptation through the creation of PPGIS mapping depicting historical institutional displacement. This spatial information is linked to the qualitative investigation focusing on the expression of values in adaptation by examining social structures and investigating technological development. Drawing on Bourdieu's ideas of fields, capital and habitus, interview data is gathered from: displacees; local elites; the engineering-science community; and the political-administrative structure. The analysis is conducted along four themes; the spatial history of community displacement; social values; institutional operation; and learning in practice. Findings show the marked persistence of displaced local institutions. Dormant erosion zones host the most displaced institutions, acting as refuges once the risk is lowered through engineering or serendipity. The non-material values deeply impacted by the hazard underpin the strong local aspiration for engineering intervention. However, political discontinuity, associated institutional instability and spatial biasing of construction hinders the success of erosion mitigation and the development of appropriate national technological expertise. The small national economic resource base, shortsighted negotiations with international lenders and reduced public confidence in water sector engineering are also confounding factors. Evidence suggests that social and technological progress occurs when values, institutional results and political commitment align.
Biotic Drivers of Spatial Heterogeneity and Implications for River Ecosystems
NASA Astrophysics Data System (ADS)
Wohl, Ellen
2017-04-01
Rivers throughout the northern hemisphere have been simplified and homogenized by the removal of beavers and instream wood, along with numerous forms of channel engineering and flow regulation. Loss of spatial heterogeneity in river corridors - channels and floodplains - affects downstream fluxes of water, sediment, organic matter, and nutrients, as well as stream metabolism, biomass, and biodiversity. Recent work in streams of the Colorado Rocky Mountains illustrates how the presence of beavers and instream wood can facilitate spatial heterogeneity by creating stable, persistent, multithread channel planform and high channel-floodplain and channel-hyporheic zone connectivity. This spatial heterogeneity facilitates retention of water in pools, floodplain wetlands, and hyporheic storage. Suspended sediment, particulate organic matter (POM), and solutes are also more likely to be retained in these stream segments than in more uniform stream segments with greater downstream conveyance. Retention of POM and solutes equates to greater volumes of organic carbon storage per unit valley length and greater rates of nitrogen uptake. Spatially heterogeneous stream segments also exhibit greater biomass and biodiversity of aquatic macroinvertebrates, salmonid fish, and riparian spiders than do more uniform stream segments. These significant differences in stream form and function are unlikely to be unique to this field area and can provide a conceptual model for understanding and restoring ecosystem functions in other rivers.
16. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. MECHANICAL ...
16. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. MECHANICAL AND HYDRAULIC ENGINEERS EXAMINING MODEL PUMPS. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS
19. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ELECTRONICS ...
19. YAZOO BACKWATER PUMPING STATION MODEL, YAZOO RIVER BASIN. ELECTRONICS ENGINEER AT DATA COLLECTION COMPUTER ROOM. - Waterways Experiment Station, Hydraulics Laboratory, Halls Ferry Road, 2 miles south of I-20, Vicksburg, Warren County, MS
Solidification of Savannah River plant high level waste
NASA Astrophysics Data System (ADS)
Maher, R.; Shafranek, L. F.; Kelley, J. A.; Zeyfang, R. W.
1981-11-01
Authorization for construction of the Defense Waste Processing Facility (DWPF) is expected in FY-83. The optimum time for stage 2 authorization is about three years later. Detailed design and construction will require approximately five years for stage 1, with stage 2 construction completed about two to three years later. Production of canisters of waste glass would begin in 1988, and the existing backlog of high level waste sludge stored at SRP would be worked off by about the year 2000. Stage 2 operation could begin in 1990. The technology and engineering are ready for construction and eventual operation of the DWPF for immobilizing high level radioactive waste at Savannah River Plant (SRP). Proceeding with this project will provide the public, and the leadership of this country, with a crucial demonstration that a major quanitity of existing high level nuclear wastes can be safely and permanently immobilized.
Climatic and anthropogenic controls on Mississippi River floods: a multi-proxy palaeoflood approach
NASA Astrophysics Data System (ADS)
Munoz, S. E.; Therrell, M. D.; Remo, J. W.; Giosan, L.; Donnelly, J. P.
2017-12-01
Over the last century, many of the world's major rivers have been modified for the purposes of flood mitigation, power generation, and commercial navigation. Engineering modifications to the Mississippi River system have altered the river's sediment budget and channel morphology, but the influence of these modifications on flood risk is debated. Detecting and attributing changes in river discharge is challenging because instrumental streamflow records are often too short to evaluate the range of natural hydrological variability prior to the establishment of flood mitigation infrastructure. Here we show that multi-decadal trends of flood risk on the lower Mississippi River are strongly modulated by dynamical modes of climate variability, particularly the El Niño-Southern Oscillation (ENSO) and the Atlantic Multidecadal Oscillation (AMO), but that artificial channelization has greatly amplified flood magnitudes over the last century. Our results, based on a multi-proxy reconstruction of flood frequency and magnitude spanning the last five hundred years that combines sedimentary, tree-ring, and instrumental records, reveal that the magnitude of the 100-year flood has increased by 20% over the period of record, with 75% of this increase attributed to river engineering. We conclude that the interaction of human alterations to the Mississippi River system with dynamical modes of climate variability has elevated the current flood risk to levels that are unprecedented within the last five centuries.
Change In Course Pattern Of The Teesta River: After Effect Of An Engineering Project
NASA Astrophysics Data System (ADS)
Ashrafi, Z. M.; Shuvo, S. D.; Mahmud, M. S.
2016-12-01
Bangladesh is blessed by rivers that contribute to country's agriculture, landscape development and water supply. Due to nature of the river's flow and morphology, several engineering project have been initiated to enhance its utility, Teesta barrage was one of them. After two decades of its construction in Northern Bangladesh, several study identified major impacts on local ecosystem due to hindrance in water flow. However, how Teesta River evolved in last 25 years after the barrage construction, has not been quantified yet. This study quantifies the downstream evolution of Teesta River in after-construction period (1990-2015). Time series earth observation satellite (Landsat) data and geo-spatial techniques have been utilized to understand the changes in course pattern. Besides, sinuosity index has been used to quantify it. Analysis shows that the river is becoming more braided with the rise of numerous `Char' areas (islands); as well as bifurcation of the main channel, creating newer channels increasingly. Statistically significant changes in Sinuosity Index (SI) of the Teesta river has found in post construction period. In some locations SI increased which indicate that the river is becoming more and more winding than straight it used to be around 1990. It is also found that the river is shifting towards the east where the number of human settlement is higher. The rate of shifting has accelerated during the 2000s. There are places where the course has moved about 3 kilometers from its earlier course. Therefore, higher number of human settlements are in threat of river bank erosion in recent years. River bank management should be developed considering the pattern of course change so that rural settlement can save from destructive river bank erosion.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Hydroelectric, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
...). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
..., LLC (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bossier Parish, near the Town of Ninock, Louisiana. The proposed...
Musser, Jonathan W.
2018-01-31
Digital flood-inundation maps for a 12.6-mile reach of the Withlacoochee River from Skipper Bridge Road to St. Augustine Road (Georgia State Route 133) were developed to depict estimates of the areal extent and depth of flooding corresponding to selected water levels (stages) at the U.S. Geological Survey (USGS) streamgage at Withlacoochee River at Skipper Bridge Road, near Bemiss, Ga. (023177483). Real-time stage information from this streamgage can be used with these maps to estimate near real-time areas of inundation. The forecasted peak-stage information for the USGS streamgage at Withlacoochee River at Skipper Bridge Road, near Bemiss, Ga. (023177483), can be used in conjunction with the maps developed for this study to show predicted areas of flood inundation.A one-dimensional step-backwater model was developed using the U.S. Army Corps of Engineers Hydrologic Engineer-ing Center’s River Analysis System (HEC–RAS) software for the Withlacoochee River and was used to compute flood profiles for a 12.6-mile reach of the Withlacoochee River. The hydraulic model was then used to simulate 23 water-surface profiles at 1.0-foot (ft) intervals at the Withlacoochee River near the Bemiss streamgage. The profiles ranged from the National Weather Service action stage of 10.7 ft, which is 131.0 ft above the North American Vertical Datum of 1988 (NAVD 88), to a stage of 32.7 ft, which is 153.0 ft above NAVD 88. The simulated water-surface profiles were then combined with a geographic information system digital elevation model—derived from light detection and ranging (lidar) data having a 4.0-ft horizontal resolution—to delineate the area flooded at each 1.0-ft interval of stream stage.
9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal ...
9. Building 105, Facilities Engineering Building, 1830, interior, Tin Metal area of building, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ng, D.S.; Holman, G.S.
1991-10-01
This report documents the strategy employed to develop recommended wind/tornado hazard design guidelines for a New Production Reactor (NRP) currently planned for either the Idaho National Engineering Laboratory (INEL) or the Savannah River (SR) site. The Wind/Tornado Working Group (WTWG), comprising six nationally recognized experts in structural engineering, wind engineering, and meteorology, formulated an independent set of guidelines based on site-specific wind/tornado hazard curves and state-of-the-art tornado missile technology. The basic philosophy was to select realistic wind and missile load specifications, and to meet performance goals by applying conservative structural response evaluation and acceptance criteria. Simplified probabilistic risk analyses (PRAs)more » for wind speeds and missile impact were performed to estimate annual damage risk frequencies for both the INEL and SR sites. These PRAs indicate that the guidelines will lead to facilities that meet the US Department of Energy (DOE) design requirements and that the Nuclear Regulatory Commission guidelines adopted by the DOE for design are adequate to meet the NPR safety goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
AFP no. 28 (General Electric Lynn Manufacturing dept). is located in the City of Everett, Mass. The facility is composed of 10 buildings having 344,342 square feet of floor space on a 43-acre tract. The plant is engaged in the manufacture of large jet engine components and sub-assemblies. AFT 29 (General Electric River Works Facility) is located in the City of Lynn, Mass. AFT No. 29 is part of the General Electric Aircraft Engine Business Group and the facilities are used for testing and assembly of jet engines. The following conclusions have been developed based on the results of themore » project team's field inspection, review of plant records and files, and interviews with plant personnel. Each of the sites listed below was ranked using the HARM system and was determined to have a sufficient potential for environmental contamination to warrant some degree of follow-on investigation. AFB no. 28: Waste sump and chip storage area; and AFT no. 29: Underground fuel line leaks and underground fuel storage tank leak.« less
17. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING ...
17. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING EAST The direct-acting 1883 Pittston Engine and Machine Company steam engine was made by George A. Parrish and W. B. Culver of West Pittston, Pennsylvania. - Dorrance Colliery Fan Complex, South side of Susquehanna River at Route 115 & Riechard Street, Wilkes-Barre, Luzerne County, PA
Naomi Cohn
1998-01-01
What's been done on Chicago Area Rivers is truly an inspiration. People's ability to improve these rivers shows what can be improved anywhere, even in a highly developed and complex urban setting like Chicago. A veteran staffer with the Friends of the Chicago River recently concluded: "People look at what's being accomplished on the Chicago River...
NASA Astrophysics Data System (ADS)
Kenney, M. A.; Mohrig, D.; Hobbs, B. F.; Parker, G.
2011-12-01
Land loss in the Mississippi River Delta caused by subsidence and erosion has resulted in habitat loss, interference with human activities, and increased exposure of New Orleans and other settled areas to storm surge risks. Prior to dam and levee building and oil and gas production in the 20th century, the long term rates of land building roughly balanced land loss through subsidence. Now, however, sediment is being deposited at dramatically lower rates in shallow areas in and adjacent to the Delta, with much of the remaining sediment borne by the Mississippi being lost to the deep areas of the Gulf of Mexico. A few projects have been built in order to divert sediment from the river to areas where land can be built, and many more are under consideration as part of State of Louisiana and Federal planning processes. Most are small scale, although there have been some proposals for large engineered avulsions that would divert a significant fraction of the remaining available sediment (W. Kim, et al. 2009, EOS). However, there is debate over whether small or large diversions are the economically optimally and socially most acceptable size of such land building projects. From an economic point of view, the optimal size involves tradeoffs between scale economies in civil work construction, the relationship between depth of diversion and sediment concentration in river water, effects on navigation, and possible diminishing returns to land building at a single location as the edge of built land progresses into deeper waters. Because land building efforts could potentially involve billions of dollars of investment, it is important to gain as much benefit as possible from those expenditures. We present the result of a general analysis of scale economies in land building from engineered avulsions. The analysis addresses the question: how many projects of what size should be built at what time in order to maximize the amount of land built by a particular time? The analysis integrates three models: 1. coarse sediment diversion as a function of the width, depth, and timing of water diversions (using our field measurements of sediment concentration as a function of depth), 2. land building as a function of the location, water, and amount of sediment diverted, accounting for bathymetry, subsidence, and other factors, and 3. cost of building and operating the necessary civil works. Our statistical analysis of past diversions indicates existence of scale economies in width and scale of diseconomies in depth. The analysis explores general relationships between size, cost, and land building, and does not consider specific actual project proposals or locations. Sensitivity to assumptions about fine sediment capture, accumulation rates for organic material, and other inputs will be discussed.
33 CFR 162.205 - Suisun Bay, San Joaquin River, Sacramento River, and connecting waters, CA.
Code of Federal Regulations, 2011 CFR
2011-07-01
... executing river and harbor improvement work for the United States, and displaying the signals prescribed by... exercise special caution to avoid interference with the work on which the plant is engaged. Dredges...); a wharf or other structure; work under construction; plant engaged in river and harbor improvement...
Navarro-Ortega, Alícia; Acuña, Vicenç; Batalla, Ramon J; Blasco, Julián; Conde, Carlos; Elorza, Francisco J; Elosegi, Arturo; Francés, Félix; La-Roca, Francesc; Muñoz, Isabel; Petrovic, Mira; Picó, Yolanda; Sabater, Sergi; Sanchez-Vila, Xavier; Schuhmacher, Marta; Barceló, Damià
2012-05-01
The Consolider-Ingenio 2010 project SCARCE, with the full title "Assessing and predicting effects on water quantity and quality in Iberian Rivers caused by global change" aims to examine and predict the relevance of global change on water availability, water quality, and ecosystem services in Mediterranean river basins of the Iberian Peninsula, as well as their socio-economic impacts. Starting in December 2009, it brought together a multidisciplinary team of 11 partner Spanish institutions, as well as the active involvement of water authorities, river basin managers, and other relevant agents as stakeholders. The study areas are the Llobregat, Ebro, Jucar, and Guadalquivir river basins. These basins have been included in previous studies and projects, the majority of whom considered some of the aspects included in SCARCE but individually. Historical data will be used as a starting point of the project but also to obtain longer time series. The main added value of SCARCE project is the inclusion of scientific disciplines ranging from hydrology, geomorphology, ecology, chemistry, and ecotoxicology, to engineering, modeling, and economy, in an unprecedented effort in the Mediterranean area. The project performs data mining, field, and lab research as well as modeling and upscaling of the findings to apply them to the entire river basin. Scales ranging from the laboratory to river basins are addressed with the potential to help improve river basin management. The project emphasizes, thus, linking basic research and management practices in a single framework. In fact, one of the main objectives of SCARCE is to act as a bridge between the scientific and the management and to transform research results on management keys and tools for improving the River Basin Management Plans. Here, we outline the general structure of the project and the activities conducted within the ten Work Packages of SCARCE.
Spatial and temporal variations of metal content and water quality in the Belaya River Basin
NASA Astrophysics Data System (ADS)
Fashchevskaia, T. B.; Motovilov, Y.
2016-12-01
The aim of this research is to identify the spatiotemporal regularities of iron, copper and zinc contents dynamics in the streams of the Belaya River basin. The Belaya River is situated in the South Ural region and is one of the biggest tributary in the Volga River basin with catchment area of 142 000 km2. More than sixty years the diverse economic activities are carried out in the Belaya River basin, the intensity of this activity is characterized by high temporal variability. The leading industries in the region are oil, mining, petroleum processing, chemistry and petro chemistry, mechanical engineering, metallurgy, power industry. The dynamics of human activities in the catchment and intra and inter-annual changes in the water quality are analyzed for the period 1969-2007 years. Inter-annual dynamics of the metal content in the river waters was identified on the basis of the long-term hydrological monitoring statistics at the 32 sites. It was found that the dynamics of intensity of economic activities in the Belaya River basin is the cause statistically significant changes in the metal content of the river network. Statistically homogeneous time intervals have been set for each monitoring site. Within these time intervals there were obtained averaged reliable quantitative estimations of water quality. Empirical probability distributions of iron, copper and zinc concentrations for various phases of the water regime in all investigated monitoring sites were approximated by Pearson type III curves and the averages of the concentration values, the coefficient of variation and asymmetry, as well as the values of the concentrations of metal in the range of 1-95% of frequency were estimated. It was found that by the end of the test period, the average long-term concentrations for iron and copper exceed MAC for fishery use, for zinc become smaller MAC in many streams of Belaya River basin. Acknowledgements. The work was financially supported by the Russian Foundation for Basic Research (Grant 15-05-09022)
NASA Astrophysics Data System (ADS)
Strom, K. B.; Bhattacharya, J.
2012-12-01
River discharges with very high sediment loads have the potential to develop into plunging hyperpycnal flows that transition from a river jet to a turbidity current at some location basinward of the river mouth due to the density difference between the turbid river and the receiving water body. However, even if the bulk density of the turbid river is greater than that of the receiving lake or ocean, some distance is needed for the forward inertia of the river to dissipate so that the downward gravitational pull can cause the system to collapse into a subaqueous turbidity current. This collapsing at the plunge point has been found to occur when the densimetric Froude number decreases to a value between 0.3 < Frd < 0.7 (Fang and Stefan 2000, Parker and Toniolo 2007, Dai and Garcia 2010, Lamb et al. 2010). In 2D channel flow analysis at the plunge point, this has led to the concept of a two-fold criterion for plunging. The first is simply for the need of high enough suspended sediment concentration to overcome the density difference between the river fluid and the fluid of the receiving water. The second is the need for sufficiently deep water to reduce the densimetric Froude below the critical value for plunging, which leads to dependence of plunging on the receiving water basin topography (Lamb et al. 2010). In this analysis, we expand on past work by solving a system of ODE river jet equations to account for bottom friction, lateral entrainment of ambient fluid, and particle settling between the river mouth and the plunge location. Typical entrainment and bottom friction coefficients are used and the model is tested against the laboratory density current data of Fang and Stefan (1991). A suite of conditions is solved with variable river discharge velocity, aspect ratio, suspended sediment concentration, and particle size; a range of salinity values and bottom slopes are used for the receiving water body. The plunge location is then expressed as a function of the boundary conditions at the river mouth and those of the receiving water. The relationships can be used for modern systems, but can also help to put reasonable bounds on paleo-hydraulic setting. References Dai, A. & Garcia, M. H. (2010). Energy Dissipative Plunging Flows. Journal of Hydraulic Engineering, 136(8), 519-523. Fang, X. & Stefan, H. G. (1991). Integral Jet Model for Flow from an Open Channel into a Shallow Lake or Reservoir. St. Anthony Falls Hydraulic Laboratory. Fang, X. & Stefan, H. G. (2000). Dependence of dilution of a plunging discharge over a sloping bottom on inflow conditions and bottom friction. Journal of Hydraulic Research, 38(1), 15-25. Lamb, M. P., McElroy, B., Kopriva, B., Shaw, J., & Mohrig, D. (2010). Linking river-flood dynamics to hyperpycnal-plume deposits: Experiments, theory, and geological implications. Geological Society of America Bulletin, 122(9/10), 1389-1400. Parker, G. & Toniolo, H. (2007). Note on the Analysis of Plunging of Density Flows. Journal of Hydraulic Engineering, 133(6), 690-694.
Functional Topology of Evolving Urban Drainage Networks
NASA Astrophysics Data System (ADS)
Yang, Soohyun; Paik, Kyungrock; McGrath, Gavan S.; Urich, Christian; Krueger, Elisabeth; Kumar, Praveen; Rao, P. Suresh C.
2017-11-01
We investigated the scaling and topology of engineered urban drainage networks (UDNs) in two cities, and further examined UDN evolution over decades. UDN scaling was analyzed using two power law scaling characteristics widely employed for river networks: (1) Hack's law of length (L)-area (A) [L∝Ah] and (2) exceedance probability distribution of upstream contributing area (δ) [P>(A≥δ>)˜aδ-ɛ]. For the smallest UDNs (<2 km2), length-area scales linearly (h ˜ 1), but power law scaling (h ˜ 0.6) emerges as the UDNs grow. While P>(A≥δ>) plots for river networks are abruptly truncated, those for UDNs display exponential tempering [P>(A≥δ>)=aδ-ɛexp>(-cδ>)]. The tempering parameter c decreases as the UDNs grow, implying that the distribution evolves in time to resemble those for river networks. However, the power law exponent ɛ for large UDNs tends to be greater than the range reported for river networks. Differences in generative processes and engineering design constraints contribute to observed differences in the evolution of UDNs and river networks, including subnet heterogeneity and nonrandom branching.
19. Stress sheet for the river span dated 7/13/12; revised ...
19. Stress sheet for the river span dated 7/13/12; revised Oct. 18 and 21, 1912. Drawing courtesy Office of the Cuyahoga County Engineer, Cleveland, Ohio. - Detroit Superior High Level Bridge, Cleveland, Cuyahoga County, OH
Extent and frequency of floods on Delaware River in vicinity of Belvidere, New Jersey
Farlekas, George M.
1966-01-01
A stream overflowing its banks is a natural phenomenon. This natural phenomenon of flooding has occurred on the Delaware River in the past and will occur in the future. T' o resulting inundation of large areas can cause property damage, business losses and possible loss of life, and may result in emergency costs for protection, rescue, and salvage work. For optimum development of the river valley consistent with the flood risk, an evaluation of flood conditions is necessary. Basic data and the interpretation of the data on the regimen of the streams, particularly the magnitude of floods to be expected, the frequency of their occurrence, and the areas inundated, are essential for planning and development of flood-prone areas.This report presents information relative to the extent, depth, and frequency of floods on the Delaware River and its tributaries in the vicinity of Belvidere, N.J. Flooding on the tributaries detailed in the report pertains only to the effect of backwater from the Delaware River. Data are presented for several past floods with emphasis given to the floods of August 19, 1955 and May 24, 1942. In addition, information is given for a hypothetical flood based on the flood of August 19, 1955 modified by completed (since 1955) and planned flood-control works.By use of relations presented in this report the extent, depth, and frequency of flooding can be estimated for any site along the reach of the Delaware River under study. Flood data and the evaluation of the data are presented so that local and regional agencies, organizations, and individuals may have a technical basis for making decisions on the use of flood-prone areas. The Delaware River Basin Commission and the U.S. Geological Survey regard this program of flood-plain inundation studies as a positive step toward flood-damage prevention. Flood-plain inundation studies, when followed by appropriate land-use regulations, are a valuable and economical supplement to physical works for flood control, such as dams and levees. Both physical works and flood-plain regulations are included in the comprehensive plans for development of the Delaware River basin.Recommendations for land use, or suggestions for limitations of land use, are not made herein. Other reports on recommended general use and regulation of land in flood-prone areas are available (Dola, 1961; White, 1961; American Society of Civil Engineers Task Force on Flood Plain Regulations, 1962; and Goddard, 1963). The primary responsibility for planning for the optimum land use in the flood plain and the implementation of flood-plain zoning or other regulations to achieve such optimum use rest with the state and local interests. The preparation of this report was undertaken after consultation with representatives of the Lehigh-Northampton Counties, Pennsylvania, Joint Planning Commission and the Warren County, New Jersey, Regional Planning Board and after both had demonstrated their need for flood-plain information and their willingness to consider flood-plain regulations.
10. Building 105, Facilities Engineering Building, 1830, interior, air condition ...
10. Building 105, Facilities Engineering Building, 1830, interior, air condition repair shop, S end of building, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, Monica
Monica Phillips discuss her role as an engineer at Savannah River National Laboratory. Her mission is to provide support to various customers on-site through engineered equipment and solutions, along with solving complex problems to help them meet their needs.
39. ENGINE LATHE, SANDER, AND LATHE WITH PATTERNS AND SHAFTS ...
39. ENGINE LATHE, SANDER, AND LATHE WITH PATTERNS AND SHAFTS ABOVE-LOOKING NORTHWEST. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, ...
8. Building 105, Facilities Engineering Building, 1830, interior, drafting area, east side of building, center, looking N. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
77 FR 20331 - Department of the Army, Corps of Engineers
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... and Indian Field Creek along the York River in Yorktown, VA; Restricted Area AGENCY: U.S. Army Corps... comments. SUMMARY: The Corps of Engineers is proposing to amend an existing permanent restricted area in... Weapons Station Yorktown is requesting the Corps of Engineers modify the existing restricted area to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, near the town of Ninock near the City of Shreveport, Louisiana. g. Filed Pursuant to...
Code of Federal Regulations, 2014 CFR
2014-07-01
... District Engineer and market by signs and/or flashing red lights installed in conspicuous and appropriate... structures located on the left-hand side (facing downstream) of the river and a black can-type buoy for such... buoy of appropriate type and color (red nun or black can buoy) until covered by a depth of water equal...
Code of Federal Regulations, 2013 CFR
2013-07-01
... District Engineer and market by signs and/or flashing red lights installed in conspicuous and appropriate... structures located on the left-hand side (facing downstream) of the river and a black can-type buoy for such... buoy of appropriate type and color (red nun or black can buoy) until covered by a depth of water equal...
Restoration of active gully systems following the implementation of bioengineering techniques.
NASA Astrophysics Data System (ADS)
Borja, Pablo; Vanacker, Veerle; Govers, Gerard
2015-04-01
Intensive land use in the central parts of the Andean basin has led to widespread land degradation. The formation of badlands dates back from the 1950s and 1960s. Several studies indicate that human activities have accelerated mountain erosion rates by up to 100 times. In this study, we have evaluated the effects of bio-engineering works aiming to stabilize degraded catchments. Five micro-catchments (0.2 up to 5 ha) have been selected within a 3 km2 area in the lower part of the Loreto catchment (Southern Ecuadorian Andes). The five micro-catchments differ in vegetation cover and implementation of bio-engineering works. The experimental design consisted of three micro-catchments: (1) DI with conservation works, (2) DF with reforestation by Eucalyptus sp and (3) DT with no conservation works. Two micro-catchments have been monitored in an agricultural area: with (AI) and without (AT) bio-engineering works in the active gullies. Small checkdams were constructed in the gully floors of two of the micro-catchments in the badland area (DI) and the agricultural area (AI). The checkdams are made of wood and tires. Water flow has been measured in every micro-catchment, while sediment traps were constructed to monitor sediment transport. Results show that bio-engineering techniques are effective to stabilize active gullies. Deposition of sediments in manmade dams is strongly dependent on previous rainfall events, as well as gully channel slope, and its vegetation cover. From the experimental data, an I30 max threshold value was determined. Above this threshold value, all micro-catchments are actively contributing sediment to the main river system. The checkdams built with wood and tires have an efficiency of 70%, and were shown to be very effective to stabilize active gullies in bad lands through significant reduction (about 62%) of the amount of sediment exported from the micro-catchments. Key words: degraded soils, erosion, sediment, restoration, reforestation
Effectiveness evaluation of flood defence structures in different geomorphological contexts
NASA Astrophysics Data System (ADS)
Morelli, Stefano; Pazzi, Veronica; Fanti, Riccardo
2017-04-01
The flood risk in different geomorphological contexts of two less developed countries are investigated in order to evaluate the efficacy of the existing flood defence structures. In particular, a recent floodplain crossed by a wide meandering river and a narrow mountain valley flowed by creek with a torrential regime have been chosen for such analysis in North Albania and central Mexico, respectively. Both areas have been affected by disastrous floods in past years with considerable damages to properties and people. Some safety countermeasures have been performed over time, even if in a non-systematic way. For this reason, the current inclination to flood risk was assessed by means of a freeware software designed to perform one-dimensional (1D) hydraulic modelling for a full network of natural and anthropic channels (HEC-RAS software by Hydrologic Engineering Center River Analysis System). This new analyses take into account: i) the natural morphological variability along the river path, ii) the anthropic interventions on the fluvial dynamics, iii) the landscape appearance after the soil exploitation in the past years, and iv) all the changes induced by an exceeded informal urbanization. The reconstruction of the river and bordering areas geometric data was carried out according to the physical characteristics of the local environment: a bathymetric survey and near-river DGPS acquisitions for the open spaces of the Albanian floodplain, and traditional topographic methods for the highly vegetated Mexican valley. In both cases, the results show that the existing works are, on their own, poorly efficient in containing the predictable floods. Albanians levees seem underdimensioned, while the channelling works are too narrow to contain large amounts of water and solid transport as typical of the Mexican study area. Evidently, a new territorial planning is required in these areas, and some projects are now in place. However, it would be desirable that local authorities were profitably inspired by the criticalities here mentioned.
15. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
15. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1917, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. General plan of locks in 1990's - St. Mary's Falls Canal, Soo Locks, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
ERIC Educational Resources Information Center
Nienkamp, Paul
2010-01-01
During the twentieth-century, American engineers harnessed the atom, sent men to the moon, and literally reshaped the world. They re-routed rivers to create giant hydroelectric dams, created a massive and interconnected highway system, and designed skyscrapers, jets, computers, and the internet. As a modern profession, engineering boasted strong…
NASA Images Mississippi River Flooding in Louisiana
2011-05-19
NASA Terra spacecraft shows the water flow after the U.S. Army Corps of Engineers opened the Morganza Spillway, a flood control structure along the western bank of the Mississippi River in Louisiana, to ease flooding along levee systems on May 14, 2011.
ASTER Images Flooding from Mississippi River Levee Breach
2011-05-10
NASA Terra spacecraft shows the resultant flooding of farmland west of the Mississippi 20 miles south of the Mississippi River levee breach. U.S. Army Corps of Engineers detonated explosives at the Birds Point levee near Wyatt, Missouri, on May 2, 2011.
User's manual for BRI-STARS (BRIdge Stream Tube model for Alluvial River Simulation)
DOT National Transportation Integrated Search
1998-07-01
There is a need for a generalized water and sediment-routing computer model for solving complicated river engineering problems with limited data and resources. This program should have the following capabilities: to compute hydraulic parameters for o...
Modeling Trihalomethane Formation Potential from Wastewater Chlorination
1994-09-01
Aerated Lagoon Chlor/Dechlor - - - King Salmon River Luke, AZ Tertiary Ultraviolet 1.2 MGD Agua Fria River / Irrigation MacDD, FL Activated Sludge...November 1988). Tchobanoglous, George and Burton, Franklin L. Wastewater engineering: treatment, disposal, and reuse / Metcalf & Eddy, Inc. -3rd ed
18. VIEW TOWARD MAIN ENTRANCE OF AMERICAN TOOL ENGINE LATHE, ...
18. VIEW TOWARD MAIN ENTRANCE OF AMERICAN TOOL ENGINE LATHE, JIB CRANE ABOVE-LOOKING NORTH. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
17. TRACTOR ENGINE POWERING SHAFT SYSTEM IN FOREGROUND, BELT CONNECTS ...
17. TRACTOR ENGINE POWERING SHAFT SYSTEM IN FOREGROUND, BELT CONNECTS WITH MAIN SHAFT LOOKING EAST. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
13. RADIAL DRILL, ENGINE LATHE, DRILL PRESS, AND GRINDER (L ...
13. RADIAL DRILL, ENGINE LATHE, DRILL PRESS, AND GRINDER (L TO R)-LOOKING SOUTHEAST. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
1990-11-01
cutoff trench be fractured and removed using a non-explosive demolition agent on a IV on 1H slope. No. 40 Required the additional rock excavation of the...Sniabar limestone in Modification 33 be extended downstream through the cutoff trench using the same non-explosive demolition agent . No. 41 Changed the...O45,913 i!~~C ~ &E~J----------- - -- - r - - - - --- USARMY ENGINEER DISTRICT COPPS OF ENGINEERS KIANSAS CITfY MISSOURI 1 LITTLE BLOE RIVERMISSOJRI R G~ 0
Ferris, John G.
1950-01-01
This memorandum summarize information brought out in correspondence between the office of the District Engineer of the Milwaukee District, U.S. Corps of Engineers, and the District Office of the Ground Water Branch of the U.S. Geological Survey at Lansing, Mich., concerning the probable effects on the ground-water resources of the Lansing area from the construction of a proposed flood-water cut-off channel for the Grand River to extend from Millett to Delta Mills, in Eaton County, Mich.
Test drilling in the upper Sevier River drainage basin, Garfield and Piute Counties, Utah
Feltis, R.D.; Robinson, G.B. Jr.
1963-01-01
A test-drilling program was conducted by the U.S. Geological Survey in the upper Sevier River drainage basin (fig. 1) in the summer of 1962. The program was part of a ground-water investigation made in cooperation with the Utah State Engineer. The drilling was financed cooperatively through the State Engineer by the U.S. Geological Survey, Garfield, Piute, Sevier, Sanpete, and Millard Counties, and various water users within those counties. Drilling began in May and continued through September 1962, and 21 test holes were drilled.
Bartholomay, R.C.; Knobel, L.L.; Davis, L.C.
1989-01-01
The U.S. Geological Survey 's Idaho National Engineering Laboratory project office, in cooperation with the U.S. Department of Energy, collected 35 samples of surficial sediments from the Big Lost River drainage and vicinity from July 1987 through August 1988 for analysis of grain-size distribution, bulk mineralogy, and clay mineralogy. Samples were collected from 11 sites in the channel and 5 sites in overbank deposits of the Big Lost River, 6 sites in the spreading areas that receive excess flow from the Big Lost River during peak flow conditions, 7 sites in the natural sinks and playas of the Big Lost River, 1 site in the Little Lost River Sink, and 5 sites from other small, isolated closed basins. Eleven samples from the Big Lost River channel deposits had a mean of 1.9 and median of 0.8 weight percent in the less than 0.062 mm fraction. The other 24 samples had a mean of 63.3 and median of 63.7 weight percent for the same size fraction. Mineralogy data are consistent with grain-size data. The Big Lost River channel deposits had mean and median percent mineral abundances of total clays and detrital mica of 10 and 10%, respectively, whereas the remaining 24 samples had mean and median values of 24% and 22.5% , respectively. (USGS)
Schloesser, J.T.; Paukert, Craig P.; Doyle, W.J.; Hill, T.; Steffensen, K.D.; Travnichek, Vincent H.
2012-01-01
Large rivers throughout the world have been modified by using dike structures to divert water flows to deepwater habitats to maintain navigation channels. These modifications have been implicated in the decline in habitat diversity and native fishes. However, dike structures have been modified in the Missouri River USA to increase habitat diversity to aid in the recovery of native fishes. We compared species occupancy and fish community composition at natural sandbars and at notched and un-notched rock dikes along the lower Missouri River to determine if notching dikes increases species diversity or occupancy of native fishes. Fish were collected using gill nets, trammel nets, otter trawls, and mini fyke nets throughout the lower 1212 river km of the Missouri River USA from 2003 to 2006. Few differences in species richness and diversity were evident among engineered dike structures and natural sandbars. Notching a dike structure had no effect on proportional abundance of fluvial dependents, fluvial specialists, and macrohabitat generalists. Occupancy at notched dikes increased for two species but did not differ for 17 other species (81%). Our results suggest that dike structures may provide suitable habitats for fluvial species compared with channel sand bars, but dike notching did not increase abundance or occupancy of most Missouri River fishes. Published in 2011 by John Wiley & Sons, Ltd.
Solar Radiation Management and Olivine Dissolution Methods in Climate Engineering
NASA Astrophysics Data System (ADS)
Kone, S.
2014-12-01
An overview of solar radiation management and olivine dissolution methods allows to discuss, comparatively, the benefits and consequences of these two geoengineering techniques. The combination of those two techniques allows to concomitantly act on the two main agents intervening in global warming: solar radiation and carbon dioxide. The earth surface temperature increases due mainly to carbon dioxide (a greenhouse gas) that keeps the solar radiation and causes the global warming. Two complementary methods to mitigate climate change are overviewed: SRM method, which uses injected aerosols, aims to reduce the amount of the inbound solar radiation in atmosphere; and olivine dissolution in water, a key chemical reaction envisaged in climate engineering , aiming to reduce the amount of the carbon dioxide in extracting it from atmosphere. The SRM method works on scenarios of solar radiation decrease and the olivine dissolution method works as a carbon dioxide sequestration method. Olivine dissolution in water impacts negatively on the pH of rivers but positively in counteracting ocean acidification and in transporting the silica in ocean, which has benefits for diatom shell formation.
1988-10-01
these types of waste are available, with only general descriptions such as "toxic pharmaceutical waste" or " rubber and plastic waste" provided. 30...liner materials (i.e., HDPE through EPDM (ethylene/propylene/diene terpolymer)) are one to two orders of magnitude better barriers to water (on a per... ages in areas where the liner had been worked on with earth-moving equipment during removal operations (Nelson, Haxo, and McGlew 1985). Natural Soil
Photographic copy of September 16, 1931 New Orleans Morning Tribune ...
Photographic copy of September 16, 1931 New Orleans Morning Tribune newspaper article. Located in a photo album at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. SEPTEMBER 16, 1931 NEW ORLEANS MORNING TRIBUNE NEWSPAPER ARTICLE AND PICTURE OF BRIDGE BID OPENING FEATURING LOUISIANA GOVERNOR HUEY LONG, NEW ORLEANS MAYOR WALMSLEY, STATE HIGHWAY COMMISSION CHAIRMAN O.K. ALLEN AND PUBLIC BELT RAILROAD CHIEF ENGINEER ROBERT BARCLAY. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
NASA Astrophysics Data System (ADS)
Kałuża, Tomasz; Radecki-Pawlik, Artur; Plesiński, Karol; Walczak, Natalia; Szoszkiewicz, Krzysztof; Radecki-Pawlik, Bartosz
2016-04-01
In the present time integrated water management is directly connected with management and direct works in river channels themselves which are taking into account morphological processes in rivers and improve flow conditions. Our work focused on the hydraulic and hydrodynamic consequences upon the introduction of the concept of the improvement of the hydromorphological conditions of the Flinta River in a given reach following river channel management concept. Based on a comprehensive study of the hydromorphological state of the river, four sections were selected where restoration measures can efficiently improve river habitat conditions in the river. For each section a set of technical and biological measures were proposed and implemented in practice. One of the proposed solutions was to construct plant basket hydraulic structures (PBHS) within the river channel, which are essentially plant barriers working as sediment traps, changing river channel morphology and are in line with concepts of Water Framework Directive. These relatively small structures work as crested weirs and unquestionably change the channel morphology. Along our work we show the results of three-year long (2013-2015) systematic measurements that provided information on the morphological consequences of introducing such structures into a river channel. Our main conclusions are as follows: 1. Plant basket hydraulic structures cause changes in hydrodynamic conditions and result in sediment accumulation and the formation of river backwaters upstream and downstream the obstacle; 2. The introduced plant basket hydraulic structures cause plant debris accumulation which influences the hydrodynamic flow conditions; 3. The installation of plant basket hydraulic structures on the river bed changes flow pattern as well as flow hydrodynamic conditions causing river braiding process; 4. The erosion rate below the plant basket hydraulic structures is due to the hydraulic work conditions of the PBHS and its calculated value was confirmed by direct measurements in the field. In our calculations we used VCmaster software. This Work funded by the National Science Centre allocated based on the number of decision: DEC-2011/01 / B / ST10 / 06959
Upper Mississippi River and Illinois Waterways : non-structural measures cost-benefit study
DOT National Transportation Integrated Search
2003-05-01
These analyses support the U.S. Army Corps of Engineers study of navigation in the Upper Mississippi River (UMR) and Illinois Waterway (IWW) and address the need to examine the potential of non-structural measures to improve efficiency in th...
Complaint, Master Settlement Agreement et al. for John Hubenka and LeClair Irrigation District
In 2000, Mr. Hubenka discharged dredged and/or fill material into the Wind River by constructing a series of dikes in the river without first obtaining a CWA Section 404 permit from the Army Corps of Engineers (“Corps”).
A comparison study of one-and two-dimensional hydraulic models for river environments.
DOT National Transportation Integrated Search
2017-05-01
Computer models are used every day to analyze river systems for a wide variety of reasons vital to : the public interest. For decades most hydraulic engineers have been limited to models that simplify the fluid : mechanics to the unidirectional case....
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE... Management Board. (a) Purpose. This regulation establishes and prescribes the objectives, composition, responsibilities and authority of the Mississippi River Water Control Management Board. (b) Applicability. This...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Warfare... manned or unmanned watercraft. (ii) When hazardous operations are in progress, no person, or fishing or...
NASA Astrophysics Data System (ADS)
Brown, Rocko A.; Pasternack, Gregory B.
2008-05-01
In efforts to rehabilitate regulated rivers for ecological benefits, the flow regime has been one of the primary focal points of management strategies. However, channel engineering can impact channel geometry such that hydraulic and geomorphic responses to flow reregulation do not yield the sought for benefits. To illustrate and assess the impacts of structural channel controls and flow reregulation on channel processes and fish habitat quality in multiple life stages, a highly detailed digital elevation model was collected and analyzed for a river reach right below a dam using a suite of hydrologic, hydraulic, geomorphic, and ecological methods. Results showed that, despite flow reregulation to produce a scaled-down natural hydrograph, anthropogenic boundary controls have severely altered geomorphic processes associated with geomorphic self-sustainability and instream habitat availability in the case study. Given the similarity of this stream to many others, we concluded that the potential utility of natural flow regime reinstatement in regulated gravel-bed rivers is conditional on concomitant channel rehabilitation.
Chase, Katherine J.
2013-01-01
Major floods in 1996 and 1997 on the Yellowstone River in Montana intensified public debate over the effects of human activities on the Yellowstone River. In 1999, the Yellowstone River Conservation District Council was formed to address conservation issues on the river. The Yellowstone River Conservation District Council partnered with the U.S. Army Corps of Engineers to conduct a cumulative-effects study on the main stem of the Yellowstone River. The cumulative-effects study is intended to provide a basis for future management decisions in the watershed. Streamflow statistics, such as flow-frequency and flow-duration data calculated for unregulated and regulated streamflow conditions, are a necessary component of the cumulative effects study. The U.S. Geological Survey, in cooperation with the Yellowstone River Conservation District Council and the U.S. Army Corps of Engineers, calculated streamflow statistics for unregulated and regulated conditions for the Yellowstone, Tongue, and Powder Rivers for the 1928–2002 study period. Unregulated streamflow represents flow conditions that might have occurred during the 1928–2002 study period if there had been no water-resources development in the Yellowstone River Basin. Regulated streamflow represents estimates of flow conditions during the 1928–2002 study period if the level of water-resources development existing in 2002 was in place during the entire study period. Peak-flow frequency estimates for regulated and unregulated streamflow were developed using methods described in Bulletin 17B. High-flow frequency and low-flow frequency data were developed for regulated and unregulated streamflows from the annual series of highest and lowest (respectively) mean flows for specified n-day consecutive periods within the calendar year. Flow-duration data, and monthly and annual streamflow characteristics, also were calculated for the unregulated and regulated streamflows.
Modeling discharge, temperature, and water quality in the Tualatin River, Oregon
Rounds, Stewart A.; Wood, Tamara M.; Lynch, Dennis D.
1999-01-01
The discharge, water temperature, and water quality of the Tualatin River in northwestern Oregon was simulated with CE-QUAL-W2, a two-dimensional, laterally averaged model developed by the U.S. Army Corps of Engineers. The model was calibrated for May through October periods of 1991, 1992, and 1993. Nine hypothetical scenarios were tested with the model to provide insight for river managers and regulators.
The Cumberland River Flood of 2010 and Corps Reservoir Operations
NASA Astrophysics Data System (ADS)
Charley, W.; Hanbali, F.; Rohrbach, B.
2010-12-01
On Saturday, May 1, 2010, heavy rain began falling in the Cumberland River Valley and continued through the following day. 13.5 inches was measured at Nashville, an unprecedented amount that doubled the previous 2-day record, and exceeded the May monthly total record of 11 inches. Elsewhere in the valley, amounts of over 19 inches were measured. The frequency of this storm was estimated to exceed the one-thousand year event. This historic rainfall brought large scale flooding to the Cumberland-Ohio-Tennessee River Valleys, and caused over 2 billion dollars in damages, despite the numerous flood control projects in the area, including eight U.S. Army Corps of Engineers projects. The vast majority of rainfall occurred in drainage areas that are uncontrolled by Corps flood control projects, which lead to the wide area flooding. However, preliminary analysis indicates that operations of the Corps projects reduced the Cumberland River flood crest in Nashville by approximately five feet. With funding from the American Recovery and Reinvestment Act (ARRA) of 2009, hydrologic, hydraulic and reservoir simulation models have just been completed for the Cumberland-Ohio-Tennessee River Valleys. These models are being implemented in the Corps Water Management System (CWMS), a comprehensive data acquisition and hydrologic modeling system for short-term decision support of water control operations in real time. The CWMS modeling component uses observed rainfall and forecasted rainfall to compute forecasts of river flows into and downstream of reservoirs, using HEC-HMS. Simulation of reservoir operations, utilizing either the HEC-ResSim or CADSWES RiverWare program, uses these flow scenarios to provide operational decision information for the engineer. The river hydraulics program, HEC-RAS, computes river stages and water surface profiles for these scenarios. An inundation boundary and depth map of water in the flood plain can be calculated from the HEC-RAS results using ArcInfo. The economic impacts of the different inundation depths are computed by HEC-FIA. The user-configurable sequence of modeling software allows engineers to evaluate operational decisions for reservoirs and other control structures, and view and compare hydraulic and economic impacts for various “what if?” scenarios. This paper reviews the Cumberland River May 2010 event, the impact of Corps reservoirs and reservoir operations and the expected future benefits and effects of the ARRA funded models and CWMS on future events for this area.
15. View looking N at foundation ruins of steam engine ...
15. View looking N at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR
16. View looking E at foundation ruins of steam engine ...
16. View looking E at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR
58. Photographic copy of original construction plan (St. Paul Engineer's ...
58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN
Presentations - Smith, J.R. and others, 2013 | Alaska Division of
Engineering Geology Alaska Tidal Datum Portal Climate and Cryosphere Hazards Coastal Hazards Program Guide to (1.4 M) Keywords Coastal; Coastal and River; Engineering Geology Posters and Presentations; Seward
A model study of bridge hydraulics
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers HEC-RAS (Hydrologic Engineering : Centers River Analysis System) computer program. This study was carried out to compare results of HEC-RAS : bridge modeling with laboratory e...
Fang, Yiping
2013-09-01
The three-rivers headwater region (THRHR) of Qinghai province, China plays a key role as source of fresh water and ecosystem services for central and eastern China. Global warming and human activities in the THRHR have threatened the ecosystem since the 1980s. Therefore, the Chinese government has included managing of the THRHR in the national strategy since 2003. The State Integrated Test and Demonstration Region of the THRHR highlights the connection with social engineering (focus on improving people's livelihood and well-being) in managing nature reserves. Based on this program, this perspective attempts a holistic analysis of the strategic role of the THRHR, requirements for change, indices of change, and approaches to change. Long-term success of managing nature reserves requires effective combination of ecological conservation, economic development, and social progress. Thus, the philosophy of social engineering should be employed as a strategy to manage the THRHR.
Sullivan, Annett B.; Sogutlugil, I. Ertugrul; Deas, Michael L.; Rounds, Stewart A.
2014-01-01
The upper Klamath River and adjacent Lost River are interconnected basins in south-central Oregon and northern California. Both basins have impaired water quality with Total Maximum Daily Loads (TMDLs) in progress or approved. In cooperation with the Bureau of Reclamation, the U.S. Geological Survey (USGS) and Watercourse Engineering, Inc., have conducted modeling and research to inform management of these basins for multiple purposes, including agriculture, endangered species protection, wildlife refuges, and adjacent and downstream water users. A water-quality and hydrodynamic model (CE-QUAL-W2) of the Link River to Keno Dam reach of the Klamath River for 2006–09 is one of the tools used in this work. The model can simulate stage, flow, water velocity, ice cover, water temperature, specific conductance, suspended sediment, nutrients, organic matter in bed sediment and the water column, three algal groups, three macrophyte groups, dissolved oxygen, and pH. This report documents two model scenarios and a test of the existing model applied to year 2011, which had exceptional water quality. The first scenario examined the water-quality effects of recirculating Klamath Straits Drain flows into the Ady Canal, to conserve water and to decrease flows from the Klamath Straits Drain to the Klamath River. The second scenario explicitly incorporated a 2.73×106 m2 (675 acre) off-channel connected wetland into the CE-QUAL-W2 framework, with the wetland operating from May 1 through October 31. The wetland represented a managed treatment feature to decrease organic matter loads and process nutrients. Finally, the summer of 2011 showed substantially higher dissolved-oxygen concentrations in the Link-Keno reach than in other recent years, so the Link-Keno model (originally developed for 2006–09) was run with 2011 data as a test of model parameters and rates and to develop insights regarding the reasons for the improved water-quality conditions.
1989-03-01
34.4* TECHNICAL REPORT HL-89-4 WATER QUALITY OUTLET WORKS PROTOTYPE TESTS, WARM SPRINGS DAM DRY CREEK, RUSSIAN RIVER BASIN AD-A207 058 SONOMA COUNTY , CALIFORNIA...Clawflcation) [7 Water Quality Outlet Works Prototype Tests, Warm Springs Dam, Dry Creek, Russian River Basin, Sonoma County , California 12. PERSONAL...Cointogobvil Be,,pesso Figur 1. iciniyama Pealm WATER QUALITY OUTLET WORKS PROTOTYPE TESTS WARM SPRINGS DAM, DRY CREEK, RUSSIAN RIVER BASIN SONOMA COUNTY , CALIFORNIA
1980-01-01
Engineering Branch Engineering Division CARNEY M. TERZIAN, MEMBER Design Branch Engineering Division S, RICHARD DIE O CHIRA Water Control Branch...Associates, P.C. under a letter of 19 October 1979 from William E. Hodgson, Jr., Colonel, Corps of Engineers. Contract No. DACW33-80-C-0001 has been assigned
14. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
14. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1917, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. General plan of locks prior to completion of Sabin (fourth) Lock - St. Mary's Falls Canal, Soo Locks, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
16. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
16. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1915, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. Filling and emptying culvert butterfly valve and hydraulic piston. - St. Mary's Falls Canal, Soo Locks, Sabin Lock Subcomplex, Sabin Lock, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
9. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
9. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1912, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. Filling and emptying culvert butterfly valve and hydraulic piston. - St. Mary's Falls Canal, Soo Locks, Davis Lock Subcomplex, Davis Lock, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
Macrophytes: ecosystem engineers in UK urban rivers
NASA Astrophysics Data System (ADS)
Gibbs, H.; Gurnell, A.; Heppell, K.; Spencer, K.
2012-04-01
Macrophytes act as ecosystem engineers within river channels in that they have the ability to cause geomorphological and ecological change. They induce reductions in flow velocity and associated sediment accumulation, and their system of underground roots and rhizomes also reinforces the accumulated sediment reducing sediment erosion and resuspension and creating habitats. As sediments, particularly finer-grained, store contaminants including metals, this engineering means that in the specific context of urban rivers where sediments are more likely to be contaminated, macrophytes trap and hold contaminated sediments creating a potentially important sink of metals. However, depending on the ability for the macrophyte to reinforce the sediment and reduce erosion and resuspension, there is the potential for the sink to turn in to a source and metals to be released in to the overlying water. This research therefore looks at the ecosystem engineering ability of common macrophytes in UK urban rivers by looking at: (i) the effect upon flow velocity and sediment accumulation of Sparganium erectum (branched bur-reed); (ii) the sediment reinforcement ability of both S. erectum, Typha latifolia (bulrush) and Phalaris arundinacea (reed canary grass); and, (iii) the storage of metals within the sediment, overlying water and the macrophytes. Research was undertaken on the River Blackwater, an urban river in Surrey, UK which has extensive macrophyte growth. Flow velocity measurements and fine sediment depths were recorded both within and outside of dense stands of S. erectum. The uprooting resistance (as an indicator of sediment reinforcement) was measured for three species: S. erectum, T. latifolia and P. arundinacea. Additionally, some preliminary sampling was undertaken of the sediment, overlying water and the macrophytes to determine metal storage. Lower flow velocities and greater volumes of fine sediment were recorded within the stands of S. erectum as opposed to the adjacent areas of open channel with minimal macrophyte growth. Uprooting resistances were considerable and differences were found both between species and over the annual growth cycle. T. latifolia showed the greatest uprooting resistance and P. arundinacea the lowest uprooting resistance. Maximum uprooting resistance for all species was in June. The sampled sediments were found to be a store of metals. For all macrophyte species, the below-ground tissues (roots and rhizomes) generally had greater metal concentrations than above-ground tissues (stem and leafs). The results from this research will help inform the use of macrophytes in the management of sediment-contaminated urban rivers.
A History of the Little Rock District U. S. Army Corps of Engineers
1971-01-01
Orleans on March 23, 1820, and arrived at Arkansas Post on March 31. On the sixty-mile trip from the mouth of the ,. 4 Hydraulic pile-driving on...34 and was to be kept open from the mouth of the river to the mouth of the Grand (Neosho) River, n ear present-day Muskogee, Oklahoma - a total...the river t ended to be narrower ; hence deeper a nd more n avigable. The r emainder of the White River project w a s aban- doned but the existing
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This regulation establishes and prescribes the objectives, composition...
33 CFR 223.1 - Mississippi River Water Control Management Board.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Management Board. 223.1 Section 223.1 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE BOARDS, COMMISSIONS, AND COMMITTEES § 223.1 Mississippi River Water Control Management Board. (a) Purpose. This regulation establishes and prescribes the objectives, composition...
33 CFR 334.230 - Potomac River.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 334.230 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.230 Potomac River. (a) Naval Surface Weapons... except Sundays. (ii) When firing is in progress, no person, or fishing or oystering vessels shall operate...
A Review of Flood-Related Storage and Remobilization of Heavy Metal Pollutants in River Systems.
Ciszewski, Dariusz; Grygar, Tomáš Matys
Recently observed rapid climate changes have focused the attention of researchers and river managers on the possible effects of increased flooding frequency on the mobilization and redistribution of historical pollutants within some river systems. This text summarizes regularities in the flood-related transport, channel-to-floodplain transfer, and storage and remobilization of heavy metals, which are the most persistent environmental pollutants in river systems. Metal-dispersal processes are essentially much more variable in alluvia than in soils of non-inundated areas due to the effects of flood-sediment sorting and the mixing of pollutants with grains of different origins in a catchment, resulting in changes of one to two orders of magnitude in metal content over distances of centimetres. Furthermore, metal remobilization can be more intensive in alluvia than in soils as a result of bank erosion, prolonged floodplain inundation associated with reducing conditions alternating with oxygen-driven processes of dry periods and frequent water-table fluctuations, which affect the distribution of metals at low-lying strata. Moreover, metal storage and remobilization are controlled by river channelization, but their influence depends on the period and extent of the engineering works. Generally, artificial structures such as groynes, dams or cut-off channels performed before pollution periods favour the entrapment of polluted sediments, whereas the floodplains of lined river channels that adjust to new, post-channelization hydraulic conditions become a permanent sink for fine polluted sediments, which accumulate solely during overbank flows. Metal mobilization in such floodplains takes place only by slow leaching, and their sediments, which accrete at a moderate rate, are the best archives of the catchment pollution with heavy metals.
NASA Astrophysics Data System (ADS)
Mishra, P. K.; Bernini Campos, H. E.
2016-12-01
The lower portion of the Salinas River in Monterey bay, California has a history of flood, lots of study has been made ab out the water quality since the river provides water for the crops around, but is still in need a detailed study about the river behavior and flood analysis. The floods did significant damage, affecting valuable landing farms, residences and businesses in Monterey County. The first step for this study is comprehend and collect the river bathymetry and surroundings and then analyze the discharge and how it is going to change with time. This thesis develops a model about the specific site, recruiting real data from GIS and performing a flow simulation according to flow data provided by USGS, to verify water surface elevation and floodplain. The ArcMap, developed by ESRI, was used along with an extension (HEC-GeoRAS) because it was indeed the most appropriate model to work with the Digital Elevation Model, develop the floodplain and characterizing the land surface accurately in the study site. The HEC-RAS software, developed by US Army Corp of Engineers, was used to compute one-dimension steady flow and two-dimension unsteady flow, providing flow velocity, water surface elevation and profiles, total surface area, head and friction loss and other characteristics, allowing the analysis of the flow. A mean discharge, a mean peak streamflow and a peak discharge were used for the steady flow and a Hydrograph was used for the unsteady flow, both are based on the 1995 flood and discharge history. This study provides important information about water surface elevation and water flow, allowing stakeholders and the government to analyze solutions to avoid damage to the society and landowners.
Flood Frequency Analysis For Partial Duration Series In Ganjiang River Basin
NASA Astrophysics Data System (ADS)
zhangli, Sun; xiufang, Zhu; yaozhong, Pan
2016-04-01
Accurate estimation of flood frequency is key to effective, nationwide flood damage abatement programs. The partial duration series (PDS) method is widely used in hydrologic studies because it considers all events above a certain threshold level as compared to the annual maximum series (AMS) method, which considers only the annual maximum value. However, the PDS has a drawback in that it is difficult to define the thresholds and maintain an independent and identical distribution of the partial duration time series; this drawback is discussed in this paper. The Ganjiang River is the seventh largest tributary of the Yangtze River, the longest river in China. The Ganjiang River covers a drainage area of 81,258 km2 at the Wanzhou hydrologic station as the basin outlet. In this work, 56 years of daily flow data (1954-2009) from the Wanzhou station were used to analyze flood frequency, and the Pearson-III model was employed as the hydrologic probability distribution. Generally, three tasks were accomplished: (1) the threshold of PDS by percentile rank of daily runoff was obtained; (2) trend analysis of the flow series was conducted using PDS; and (3) flood frequency analysis was conducted for partial duration flow series. The results showed a slight upward trend of the annual runoff in the Ganjiang River basin. The maximum flow with a 0.01 exceedance probability (corresponding to a 100-year flood peak under stationary conditions) was 20,000 m3/s, while that with a 0.1 exceedance probability was 15,000 m3/s. These results will serve as a guide to hydrological engineering planning, design, and management for policymakers and decision makers associated with hydrology.
NASA Astrophysics Data System (ADS)
Hajek, E. A.; Chamberlin, E.; Baisden, T.
2014-12-01
The richness of the deep-time record and its potential for revealing important characteristics of ancient fluvial landscapes has been demonstrated time and again, including compelling examples of rivers altering their behavior in response to changes in vegetation patterns or abrupt shifts in water and sediment discharge. At present, reconstructions of ancient river and floodplain dynamics are commonly qualitative, and when quantitative metrics are used, it is often for comparison among ancient deposits. Without being able to reconstruct, more comprehensively, important aspects of ancient river and floodplains dynamics, this information has only anecdotal relevance for evaluating and managing present-day landscapes. While methods for reconstructing hydrodynamic and morphodynamic aspects of ancient rivers and floodplains are useful, uncertainties associated with these snapshots complicate the ability to translate observations from geologic to engineering scales, thereby limiting the utility of insight from Earth's past in decision-making and development of sustainable landscape-management practices for modern fluvial landscapes. Here, we explore the degree to which paleomorphodynamic reconstructions from ancient channel and floodplain deposits can be used to make specific, quantitative inferences about ancient river dynamics. We compare a suite of paleoenvironmental measurements from a variety of ancient fluvial deposits (including reconstructions of paleoflow depth, paleoslope, paleo-channel mobility, the caliber of paleo-sediment load, and paleo-floodplain heterogeneity) in an effort to evaluate sampling and empirical uncertainties associated with these methods and identify promising avenues for developing more detailed landscape reconstructions. This work is aimed at helping to develop strategies for extracting practicable information from the stratigraphic record that is relevant for sustainably managing and predicting changes in today's environments.
SLS Engine Section Test Article Loaded on Barge Pegasus at NASA's Michoud Assembly Facility
2017-04-27
A NASA move team loaded the engine section structural qualification test article for the Space Launch System into the barge Pegasus docked in the harbor at NASA's Michoud Assembly Facility in New Orleans. The rocket's engine section is the bottom of the core stage and houses the four RS-25 engines. The engine section test article was moved from Building 103, Michoud’s 43-acre rocket factory, to the barge where it was loaded for a river trip to NASA’s Marshall Space Flight Center in Huntsville, Alabama. The bottom part of the test article is structurally the same as the engine section that will be flown as part of the SLS core stage. The shiny metal top part simulates the rocket's liquid hydrogen tank, which is the fuel tank that joins to the engine section. The barge Pegasus will travel 1,240 miles by river to Marshall and endure tests that pull, push, and bend it, subjecting it to millions of pounds of force. This ensures the structure can withstand the incredible stresses produced by the 8.8 million pounds of thrust during launch and ascent.
Modelling the transport of engineered metallic nanoparticles in the river Rhine.
Markus, A A; Parsons, J R; Roex, E W M; de Voogt, P; Laane, R W P M
2016-03-15
As engineered nanoparticles of zinc oxide, titanium dioxide and silver, are increasingly used in consumer products, they will most probably enter the natural environment via wastewater, atmospheric deposition and other routes. The aim of this study is to predict the concentrations of these nanoparticles via wastewater emissions in a typical river system by means of a numerical model. The calculations rely on estimates of the use of nanomaterials in consumer products and the removal efficiency in wastewater treatment plants as well as model calculations of the fate and transport of nanoparticles in a riverine system. The river Rhine was chosen for this work as it is one of the major and best studied rivers in Europe. The study gives insight in the concentrations that can be expected and, by comparing the model results with measurements of the total metal concentrations, of the relative contribution of these emerging contaminants. Six scenarios were examined. Two scenarios concerned the total emission: in the first it was assumed that nanoparticles are only released via wastewater (treated or untreated) and in the second it was assumed that in addition nanoparticles can enter the river system via runoff from the application of sludge as a fertilizer. In both cases the assumption was that the nanoparticles enter the river system as free, unattached particles. Four additional scenarios, based on the total emissions from the second scenario, were examined to highlight the consequences of the assumption of free nanoparticles and the uncertainties about the aggregation processes. If all nanoparticles enter as free particles, roughly a third would end up attached to suspended particulate matter due to the aggregation processes nanoparticles are subject to. For the other scenarios the contribution varies from 20 to 45%. Since the Rhine is a fast flowing river, sedimentation is unlikely to occur, except at the floodplains and the lakes in the downstream regions, as in fact shown by the sediment mass balance. Nanoparticles will therefore be transported along the whole river until they enter the North Sea. For the first scenario, the concentrations predicted for zinc oxide and titanium dioxide nanoparticles are in the order of 0.5 μg/l, for silver nanoparticles in the order of 5 ng/l. For zinc and titanium compounds this amounts to 5-10% of the measured total metal concentrations, for silver to 2%. For the other scenarios, the predicted nanoparticle concentrations are two to three times higher. While there are still considerable uncertainties in the inputs and consequently the model results, this study predicts that nanoparticles are capable of being transported over long distances, in much the same way as suspended particulate matter. Copyright © 2016 Elsevier Ltd. All rights reserved.
A model study of bridge hydraulics : technical summary.
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers Hydrologic Engineering Centers River Analysis System (HEC-RAS) computer program. This report is the second edition. The first edition of the report considered the laboratory m...
13. Building 105, Facilities Engineering Building, 1830, interior, tin metal ...
13. Building 105, Facilities Engineering Building, 1830, interior, tin metal shop area, showing construction of window and part of ceiling, E wall of building. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... hazards associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations... Michigan has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations...
Model based estimation of sediment erosion in groyne fields along the River Elbe
NASA Astrophysics Data System (ADS)
Prohaska, Sandra; Jancke, Thomas; Westrich, Bernhard
2008-11-01
River water quality is still a vital environmental issue, even though ongoing emissions of contaminants are being reduced in several European rivers. The mobility of historically contaminated deposits is key issue in sediment management strategy and remediation planning. Resuspension of contaminated sediments impacts the water quality and thus, it is important for river engineering and ecological rehabilitation. The erodibility of the sediments and associated contaminants is difficult to predict due to complex time depended physical, chemical, and biological processes, as well as due to the lack of information. Therefore, in engineering practice the values for erosion parameters are usually assumed to be constant despite their high spatial and temporal variability, which leads to a large uncertainty of the erosion parameters. The goal of presented study is to compare the deterministic approach assuming constant critical erosion shear stress and an innovative approach which takes the critical erosion shear stress as a random variable. Furthermore, quantification of the effective value of the critical erosion shear stress, its applicability in numerical models, and erosion probability will be estimated. The results presented here are based on field measurements and numerical modelling of the River Elbe groyne fields.
UAV based hydromorphological mapping of a river reach to improve hydrodynamic numerical models
NASA Astrophysics Data System (ADS)
Lükő, Gabriella; Baranya, Sándor; Rüther, Nils
2017-04-01
Unmanned Aerial Vehicles (UAVs) are increasingly used in the field of engineering surveys. In river engineering, or in general, water resources engineering, UAV based measurements have a huge potential. For instance, indirect measurements of the flow discharge using e.g. large-scale particle image velocimetry (LSPIV), particle tracking velocimetry (PTV), space-time image velocimetry (STIV) or radars became a real alternative for direct flow measurements. Besides flow detection, topographic surveys are also essential for river flow studies as the channel and floodplain geometry is the primary steering feature of the flow. UAVs can play an important role in this field, too. The widely used laser based topographic survey method (LIDAR) can be deployed on UAVs, moreover, the application of the Structure from Motion (SfM) method, which is based on images taken by UAVs, might be an even more cost-efficient alternative to reveal the geometry of distinct objects in the river or on the floodplain. The goal of this study is to demonstrate the utilization of photogrammetry and videogrammetry from airborne footage to provide geometry and flow data for a hydrodynamic numerical simulation of a 2 km long river reach in Albania. First, the geometry of the river is revealed from photogrammetry using the SfM method. Second, a more detailed view of the channel bed at low water level is taken. Using the fine resolution images, a Matlab based code, BASEGrain, developed by the ETH in Zürich, will be applied to determine the grain size characteristics of the river bed. This information will be essential to define the hydraulic roughness in the numerical model. Third, flow mapping is performed using UAV measurements and LSPIV method to quantitatively asses the flow field at the free surface and to estimate the discharge in the river. All data collection and analysis will be carried out using a simple, low-cost UAV, moreover, for all the data processing, open source, freely available software will be used leading to a cost-efficient methodology. The results of the UAV based measurements will be discussed and future research ideas will be outlined.
NASA Astrophysics Data System (ADS)
Hortobágyi, Borbála; Corenblit, Dov; Steiger, Johannes; Peiry, Jean-Luc
2018-03-01
Within riparian corridors, biotic-abiotic feedback mechanisms occur between woody vegetation strongly influenced by hydrogeomorphic constraints (e.g., sediment transport and deposition, shear stress, hydrological variability), fluvial landforms, and morphodynamics, which in turn are modulated by the established vegetation. During field investigations in spring 2015, we studied 16 alluvial bars (e.g., point and lateral bars) within the dynamic riparian corridor of the Allier River (France) to assess the aptitude of three pioneer riparian Salicaceae species (Populus nigra L., Salix purpurea L., and Salix alba L.) to establish and act as ecosystem engineers by trapping sediment and constructing fluvial landforms. Our aim is to empirically identify the preferential establishment area (EA; i.e., the local areas where species become established) and the preferential biogeomorphic feedback window (BFW; i.e., where and to what extent the species and geomorphology interact) of these three species on alluvial bars within a 20-km-long river reach. Our results show that the EA and BFW of all three species vary significantly along the longitudinal profile, i.e., upstream-downstream exposure on the alluvial bars, as well as transversally, i.e., the main hydrological connectivity gradient from the river channel toward the floodplain. In the present-day context of the Allier River, P. nigra is the most abundant species, appearing to act as the main engineer species affecting landform dynamics at the bar scale; S. purpurea is established and acts as an ecosystem engineer at locations on alluvial bars that are most exposed to hydrosedimentary flow dynamics, while S. alba is established on the bar tail close to secondary channels and affects the geomorphology in mixed patches along with P. nigra. Our study highlights the role of functional trait diversity of riparian engineer species in controlling the extent of fluvial landform construction along geomorphic gradients within riparian corridors exposed to frequent hydrogeomorphic disturbances.
USSR and Eastern Europe Scientific Abstracts. Engineering and Equipment. Number 26
1976-11-10
harbor in- volves a sea sector and a river sector. The author indicates the hypotheses taken into consideration, including the number of berths in the...river and sea sectors, the arrivals of sea - and river-going ships, and ship operation time. Also indicated is the system of equations describing...diffusion for plastic deformation by torsion is greater than plastic deformation by tension. The main energy diffusion mechanism is microplastic
Engineering the Kentucky River: The Commonwealth’s Waterway
1999-01-01
durable dugout canoes hollowed from the trunks of trees.6 After felling a tree, usually a poplar, sycamore, or pine , and stripping it of branches and...Skiles and Warren County interests to improve Green and Barren river navigation up to Bowling Green. Metcalfe be- came the first state official to...engi- neers employed to plan slackwater navigation on the Green and Barren rivers which would provide year-round navigation to Bowling Green. This was
Facility siting as a decision process at the Savannah River Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wike, L.D.
1995-12-31
Site selection for new facilities at Savannah River Site (SRS) historically has been a process dependent only upon specific requirements of the facility. While this approach is normally well suited to engineering and operational concerns, it can have serious deficiencies in the modern era of regulatory oversight and compliance requirements. There are many issues related to the site selection for a facility that are not directly related to engineering or operational requirements; such environmental concerns can cause large schedule delays and budget impact,s thereby slowing or stopping the progress of a project. Some of the many concerns in locating amore » facility include: waste site avoidance, National Environmental Policy Act requirements, Clean Water Act, Clean Air Act, wetlands conservation, US Army Corps of Engineers considerations, US Fish and Wildlife Service statutes including threatened and endangered species issues, and State of South Carolina regulations, especially those of the Department of Health and Environmental Control. In addition, there are SRS restrictions on research areas set aside for National Environmental Research Park (NERP), Savannah River Ecology Laboratory, Savannah River Forest Station, University of South Carolina Institute of Archaeology and Anthropology, Southeastern Forest Experimental Station, and Savannah River Technology Center (SRTC) programs. As with facility operational needs, all of these siting considerations do not have equal importance. The purpose of this document is to review recent site selection exercises conducted for a variety of proposed facilities, develop the logic and basis for the methods employed, and standardize the process and terminology for future site selection efforts.« less
Sanitary engineering and water economy in Europe
Krul, W. F. J. M.
1957-01-01
The author deals with a wide variety of aspects of water economy and the development of water resources, relating them to the sanitary engineering problems they give rise to. Among those aspects are the balance between available resources and water needs for various purposes; accumulation and storage of surface and ground water, and methods of replenishing ground water supplies; pollution and purification; and organizational measures to deal with the urgent problems raised by the heavy demands on the world's water supply as a result of both increased population and the increased need for agricultural and industrial development. The author considers that at the national level over-all plans for developing the water economy of countries might well be drawn up by national water boards and that the economy of inter-State river basins should receive international study. In such work the United Nations and its specialized agencies might be of assistance. PMID:13472427
Guidelines for Software Engineering Education Version 1.0
1999-11-01
Turbo Pascal and Software Design. Sudbury, Massachusetts: Jones and Bartlett, 1997. " Deitel, Harvey M. & Deitel, Paul J. C++: How to Program . Upper...Saddle River, New Jersey: Prentice-Hall, 1997. " Deitel, Harvey M. & Deitel, Paul J. Java: How to Program . Upper Saddle River, New Jersey: Prentice-Hall
Publications - STATEMAP Project | Alaska Division of Geological &
., 2008, Surficial-geologic map of the Salcha River-Pogo area, Big Delta Quadrangle, Alaska: Alaska , Engineering - geologic map, Alaska Highway corridor, Delta Junction to Dot Lake, Alaska: Alaska Division of geologic map of the Salcha River-Pogo area, Big Delta Quadrangle, Alaska: Alaska Division of Geological
18. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
18. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. SUPERSTRUCTURE DETAILS. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
16. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
16. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. SUPERSTRUCTURE DETAILS. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
17. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
17. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. SUPERSTRUCTURE DETAILS. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
8. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
8. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1911, by U.S. Army Corps of Engineers. Drawings in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. General plan of hydraulic accumulator, exhaust reservoir, and pressure pumps. - St. Mary's Falls Canal, Soo Locks, Davis Lock Subcomplex, Southwest Operating Shelter, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
10. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering ...
10. Wayne Chandler, Photographer, May 2000 Photographic copy of engineering drawings, dated 1912, by U.S. Army Corps of Engineers. Drawing in possession of U.S. Army Corps of Engineers, Sault Ste. Marie, Michigan. Hydraulic accumulator and pressure pumping plant for east end of Davis Lock. - St. Mary's Falls Canal, Soo Locks, Davis Lock Subcomplex, Davis Lock, St. Mary's River at Falls, Sault Ste. Marie, Chippewa County, MI
NASA Astrophysics Data System (ADS)
Kalyanapu, A. J.; Dullo, T. T.; Thornton, J. C.; Auld, L. A.
2015-12-01
Obion River, is located in the northwestern Tennessee region, and discharges into the Mississippi River. In the past, the river system was largely channelized for agricultural purposes that resulted in increased erosion, loss of wildlife habitat and downstream flood risks. These impacts are now being slowly reversed mainly due to wetland restoration. The river system is characterized by a large network of "loops" around the main channels that hold water either from excess flows or due to flow diversions. Without data on each individual channel, levee, canal, or pond it is not known where the water flows from or to. In some segments along the river, the natural channel has been altered and rerouted by the farmers for their irrigation purposes. Satellite imagery can aid in identifying these features, but its spatial coverage is temporally sparse. All the alterations that have been done to the watershed make it difficult to develop hydraulic models, which could predict flooding and droughts. This is especially true when building one-dimensional (1D) hydraulic models compared to two-dimensional (2D) models, as the former cannot adequately simulate lateral flows in the floodplain and in complex terrains. The objective of this study therefore is to study the performance of 1D and 2D flood models in this complex river system, evaluate the limitations of 1D models and highlight the advantages of 2D models. The study presents the application of HEC-RAS and HEC-2D models developed by the Hydrologic Engineering Center (HEC), a division of the US Army Corps of Engineers. The broader impacts of this study is the development of best practices for developing flood models in channelized river systems and in agricultural watersheds.
Evaluating Investment in Missouri River Restoration: The Missouri River Effects Analysis
NASA Astrophysics Data System (ADS)
Jacobson, R. B.; Fischenich, C. J.; Buenau, K. E.
2014-12-01
In excess of $700 million has been spent over the last 10 years on restoration of the Missouri River. During this time, restoration efforts have focused progressively on avoidance of jeopardy for three threatened or endangered species: interior least tern (Sternula antillarum), piping plover (Charadrius melodus), and the pallid sturgeon (Scaphirhynchus albus). In 2013, the US Army Corps of Engineers, the US Fish and Wildlife Service, and Missouri River stakeholders (through the Missouri River Recovery Implementation Committee) commissioned an Effects Analysis (EA; Murphy and Weiland, 2011) to evaluate the effects of this effort on the three species' populations and to project effects of future restoration. The EA includes synthesis of existing abiotic and biotic scientific information relating to species population processes, distributions, and habitat needs, as well as development of conceptual and quantitative models linking river context to its management and to species' responses. The EA also includes design of the next generation of hypothesis-driven science to support adaptive management of the species and the river. The Missouri River EA faces the challenge of evaluating how management of North America's largest reservoir storage system, 600 km of non-channelized mainstem, and nearly 1,200 km of channelized mainstem contribute to species' population dynamics. To support EA needs, the US Army Corps of Engineers is developing a new generation of reservoir simulation and routing models for the Missouri River basin, coupled with components to evaluate ecological and socio-economic metrics. The EA teams are developing coordinated models relating management to functional habitats and species' responses. A particular challenge faced by the EA is communicating the very different uncertainties in population dynamics between well-documented birds and the enigmatic fish, and the implications of this disparity in decision making, implementation, and adaptive management strategies.
12. VIEW FROM MAIN ENTRANCE OF STOVE, ENGINE LATHE, AND ...
12. VIEW FROM MAIN ENTRANCE OF STOVE, ENGINE LATHE, AND GRINDER (L TO R) IN FOREGROUND, SHAFTING ABOVE LOOKING SOUTH. - W. A. Young & Sons Foundry & Machine Shop, On Water Street along Monongahela River, Rices Landing, Greene County, PA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-20
... associated with the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operations. During any of... has determined that the U.S. Army Corps of Engineers Electromagnetic Fields evaluation operation poses...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.
The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions ofmore » the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Diefenderfer, Heida L.
This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbiamore » River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less
Flow Induced Vibration Program at Argonne National Laboratory
NASA Astrophysics Data System (ADS)
1984-01-01
The Argonne National Laboratory's Flow Induced Vibration Program, currently residing in the Laboratory's Components Technology Division is discussed. Throughout its existence, the overall objective of the program was to develop and apply new and/or improved methods of analysis and testing for the design evaluation of nuclear reactor plant components and heat exchange equipment from the standpoint of flow induced vibration. Historically, the majority of the program activities were funded by the US Atomic Energy Commission, the Energy Research and Development Administration, and the Department of Energy. Current DOE funding is from the Breeder Mechanical Component Development Division, Office of Breeder Technology Projects; Energy Conversion and Utilization Technology Program, Office of Energy Systems Research; and Division of Engineering, Mathematical and Geosciences, office of Basic Energy Sciences. Testing of Clinch River Breeder Reactor upper plenum components was funded by the Clinch River Breeder Reactor Plant Project Office. Work was also performed under contract with Foster Wheeler, General Electric, Duke Power Company, US Nuclear Regulatory Commission, and Westinghouse.
NASA Astrophysics Data System (ADS)
Korkin, S.; Talyneva, O.; Kail, E.
2018-03-01
In the presented work we consider mire landscapes in the context of temperature monitoring. The mire landscapes in engineering development of the territory are very sensitive to anthropogenic impact that leads to a change in surface conditions, changes in natural succession and, as a rule, to changes in soil temperature and properties, which in turn may develop a complex of hostile geodynamic processes. For this study we used recording systems for field measurement of peat and subsoil temperatures. The measurements were made in two key areas: the territory of the north-taiga landscapes of Western Siberia (the Siberian Ridges), and the territory of the middle-taiga landscapes of Western Siberia (the Ob middle-river lowland). The paper analyses the data obtained from five observation sites (3, 5, 5a, 6 and 8) referred to hydromorphic landscapes. For the territory of the Siberian Ridges the 5-year average soil temperature was 3°C. For the Ob middle-river lowland the 6-year average soil temperature was 4.2°C. The annual soil temperature in the period 2015-2016 for Site 5a (man-disturbed area) was 8.3°C at all depths, which is 3.8°C higher than in a natural bog (Site 5 was a control area).
16. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING ...
16. INTERIOR VIEW OF HILLMAN FAN HOUSE ENGINE ROOM LOOKING EAST This overview of the 1883 Pittston Engine and Machine Company steam engine includes the flywheel and pillowblock in the foreground, with the shaft and cylinder in the background. The engine is a horizontal, slide valve type of 30 inch bore and 60 inch stroke that turned the fan at 49 revolutions per minute. - Dorrance Colliery Fan Complex, South side of Susquehanna River at Route 115 & Riechard Street, Wilkes-Barre, Luzerne County, PA
Final Environmental Assessment: Evaluation of J-85-5 Engine Test Burn
2005-01-01
is highest in winter when birds migrate from the north. Most of the birds congregate during the winter at Reelfoot Lake and Dale Hollow Reservoir...Hydrological features include surface waters ( lakes , rivers, streams, and springs) and groundwater. Arnold AFB lies within the Duck River and the Elk...Smaller creeks R ow la nd C re ek Crumpton Creek Sinking Pond Woods Reservoir Normandy Lake Tims Ford Lake Retention Reservoir Duck River Figure 3-1 0
Geotechnical Engineering in US Elementary Schools
ERIC Educational Resources Information Center
Suescun-Florez, Eduardo; Iskander, Magued; Kapila, Vikram; Cain, Ryan
2013-01-01
This paper reports on the results of several geotechnical engineering-related science activities conducted with elementary-school students. Activities presented include soil permeability, contact stress, soil stratigraphy, shallow and deep foundations, and erosion in rivers. The permeability activity employed the LEGO NXT platform for data…
14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, ...
14. Building 105, Facilities Engineering Building, 1830, interior, 1st floor, crib area of building, showing electrical and plumbing cribs, wall and ceiling detail, looking S. - Watervliet Arsenal, Building 105, South Broadway, on Hudson River, Watervliet, Albany County, NY
13. Photocopy of engineering drawing (original drawing located in WWP ...
13. Photocopy of engineering drawing (original drawing located in WWP Building, Transmission Department, Spokane, Washington). DIMENSIONS AND DETAILS OF STEEL TOWERS, LITTLE FALLS TIE LINE. - Little Falls Tie Line Towers, Near Little Dam Falls on Spokane River, Wellpinit, Stevens County, WA
18. Photocopy of a drawing (from the Corps of Engineers ...
18. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 3) SECTION THROUGH BRIDGE 808 AND THE DAM - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE
Review of waterpower withdrawals in Weiser River Basin, Idaho
Colbert, Jesse Lane; Young, Loyd L.
1964-01-01
The Weiser River basin is primarily agricultural and is supported by extensive irrigation. The Geological Survey has initiated withdrawals, or has made powersite classifications of lands having value for reservoir sites and for waterpower production. These withdrawals have been examined to see if they should continue in force or if it is in the public interest to restore them. The 1960 report, "Upper Snake River Basin," by the U.S. bureau of Reclamation, and U.S. Army Corps of Engineers included recommendations conooming potential water resource-development sites in Water River basin. That report furnished much of the information for this review.
Morphodynamics and Sediment Transport on the Huanghe (Yellow River) Delta: Work in Progress
NASA Astrophysics Data System (ADS)
Kineke, G. C.; Calson, B.; Chadwick, A. J.; Chen, L.; Hobbs, B. F.; Kumpf, L. L.; Lamb, M. P.; Ma, H.; Moodie, A. J.; Mullane, M.; Naito, K.; Nittrouer, J. A.; Parker, G.
2017-12-01
Deltas are perhaps the most dynamic of coastal landforms with competing processes that deliver and disperse sediment. As part of the NSF Coastal SEES program, an interdisciplinary team of scientists from the US and China are investigating processes that link river and coastal sediment transport responsible for morphodynamic change of the Huanghe delta- an excellent study site due to its high sediment load and long history of natural and engineered avulsions, that is, abrupt shifts in the river course. A fundamental component of the study is a better understanding of sediment transport physics in a river system that transports mostly silt. Through theory and data analysis, we find that fine-grained rivers fail to develop full scale dunes, which results in faster water flow and substantially larger sediment fluxes as compared to sandy rivers (e.g. the Mississippi River). We also have developed new models for sediment-size dependent entrainment that are needed to make longer term predictions of river sedimentation patterns. On the delta front, we are monitoring the high sediment flux to the coast, which results in steep foresets and ideal conditions for off-shore sediment delivery via gravity flows. These constraints on sediment transport are being used to develop new theory for where and when rivers avulse - including the effects of variable flood discharge, sediment supply, and sea level rise -and how deltas ultimately grow through repeated cycles of lobe development. Flume experiments and field observations are being used to test these models, both in the main channel of the Huanghe and in channels abandoned after historic avulsions. Abandoned channels and floodplains are now dominated by coastal sediment transport through a combination of wave resuspension and tidal transport, settling lag and reverse estuarine circulation. Finally, the field and laboratory tested numerical models are being used as inputs to define a cost curve for efficient avulsion management of the Huanghe delta by minimizing expected flood-damage cost. Taken together, these studies can inform management policies and promote consideration of the natural evolution of deltas to achieve sustainability.
NASA Astrophysics Data System (ADS)
Sunardi; Sukandar; Setionohadi, B.; Sulkhani, E.; Sambah, A. B.; Pamungkas, S.
2018-04-01
River is the only access to enter the pond area in Ujung Pangkah District, Gresik. The area is difficult to access due to the siltation of the river with only 50 cm depth. In addition, rent for traditional boat is expensive. This research developed a design of a small boat efficient enough to transport fish farmer from and to the pond area. Engine from motorcycle was used as it was easy to operate and economical use of fuel. The fundamental change for this design was a small double-hulled low-lane vessel. The motor matic engine was adjusted to a propeller to get maximum boost. The results showed that a ship with 3 meters length, 1.2 meters width and 1 m height, 2 persons in charge and speed of 7 knots, could use 150cc automatic motor engine by lowering engine rotation (RPM) from 7000 RPM to 4500 RPM using a Gear Box and 4-leaf B-Serries blades with a diameter of 14 cm.
1980-03-01
Engineering Branch Engineering Division CARNEY M. TERZIAN, KENBER Design Branch Engineering Division RICHARD DIBKO CHIRA Water Control Branch...State of New Hampshire. Authorization and notice to proceed were issued to S E A Consultants Inc. under a letter of November 5, 1979 from William
Characteristics of sedimentary structures in coarse-grained alluvial rivers
NASA Astrophysics Data System (ADS)
Ackerley, David; Powell, Mark
2013-04-01
The characteristics of coarse-grained alluvial surfaces have important implications for the estimation of flow resistance, entrainment thresholds and sediment transport rates in gravel-bed rivers. This area of research has, thus, demanded attention from geomorphologists, sedimentologists, and river engineers. The majority of research has focused towards understanding the characteristics and adjustments in surface grain size. Bed stability, however, is not ultimately defined by particle size but how grains are arranged within the bed surface. For example, by the organisation of particles into a variety of grain and form scale sedimentary structures and bedforms (e.g. imbrication; pebble clusters, stone nets, transverse ribs). While it is widely acknowledged sedimentary structuring must be considered within estimates of flow resistance and sediment transport, relatively little is known about the structural properties of water-worked river gravels. As a consequence, we remain woefully ignorant of this important aspect of gravel-bed river sedimentology. The aim of this poster is to present some preliminary results of a study designed to characterise the morphodynamics of sedimentary structures in coarse-grained alluvial rivers and their implications upon entrainment thresholds and sediment transport rates. The poster focuses on investigating the variability in grain and form scale sedimentary structuring across a number of field sites. Representative patches of three gravel bars on the Rivers Wharfe, Manifold and Afon Elan, UK, have been surveyed using a Leica HDS 3000 Terrestrial Laser Scanner. The resultant raw point-cloud data, recorded at a 4mm resolution, has been registered, filtered, and interpolated to produce highly detailed 2½D digital elevation models of gravel-bed surface topography. These surfaces have been analysed using a number of structural parameters including bed elevation probability distribution function statistics (standard deviation, skewness, kurtosis), semivariograms, and inclination indices. This research enhances our understanding of alluvial bed surface structures and lays the foundations for developing a more detailed understanding of their morphodynamics.
River Networks As Ecological Corridors for Species, Populations and Pathogens of Water-Borne Disease
NASA Astrophysics Data System (ADS)
Rinaldo, A.
2014-12-01
River basins are a natural laboratory for the study of the integration of hydrological, ecological and geomorphological processes. Moving from morphological and functional analyses of dendritic geometries observed in Nature over a wide range of scales, this Lecture addresses essential ecological processes that take place along dendritic structures, hydrology-driven and controlled, like e.g.: population migrations and human settlements, that historically proceeded along river networks to follow water supply routes; riparian ecosystems composition that owing to their positioning along streams play crucial roles in their watersheds and in the loss of biodiversity proceeding at unprecedented rates; waterborne disease spreading, like epidemic cholera that exhibits epidemic patterns that mirror those of watercourses and of human mobility and resurgences upon heavy rainfall. Moreover, the regional incidence of Schistosomiasis, a parasitic waterborne disease, and water resources developments prove tightly related, and proliferative kidney disease in fish thrives differently in pristine and engineered watercourses: can we establish quantitatively the critical linkages with hydrologic drivers and controls? How does connectivity within a river network affect community composition or the spreading mechanisms? Does the river basin act as a template for biodiversity or for species' persistence? Are there hydrologic controls on epidemics of water-borne disease? Here, I shall focus on the noteworthy scientific perspectives provided by spatially explicit eco-hydrological studies centered on river networks viewed as ecological corridors for species, populations and pathogens of waterborne disease. A notable methodological coherence is granted by the mathematical description of river networks as the support for reactive transport. The Lecture overviews a number of topics idiosyncratically related to my own research work but ideally aimed at a coherent body of materials and methods. A theory is thus argued to emerge on the role of dendritic geometries as environmental support for ecological dynamics and processes - a fun and possibly even instructive novel research field, possibly a hotspot of eco-hydrologic research in the years to come.
Gonthier, G.J.; Kleiss, B.A.
1996-01-01
The U.S. Geological Survey, working in cooperation with the U.S. Army Corps of Engineers, Waterways Experiment Station, collected surface-water and ground-water data from 119 wells and 13 staff gages from September 1989 to September 1992 to describe ground-water flow patterns and water budget in the Black Swamp, a bottomland forested wetland in eastern Arkansas. The study area was between two streamflow gaging stations located about 30.5 river miles apart on the Cache River. Ground-water flow was from northwest to southeast with some diversion toward the Cache River. Hydraulic connection between the surface water and the alluvial aquifer is indicated by nearly equal changes in surface-water and ground-water levels near the Cache River. Diurnal fluctuations of hydraulic head ranged from more than 0 to 0.38 feet and were caused by evapotranspiration. Changes in hydraulic head of the alluvial aquifer beneath the wetland lagged behind stage fluctuations and created the potential for changes in ground-water movement. Differences between surface-water levels in the wetland and stage of the Cache River created a frequently occurring local ground-water flow condition in which surface water in the wetland seeped into the upper part of the alluvial aquifer and then seeped into the Cache River. When the Cache River flooded the wetland, ground water consistently seeped to the surface during falling surface-water stage and surface water seeped into the ground during rising surface-water stage. Ground-water flow was a minor component of the water budget, accounting for less than 1 percent of both inflow and outflow. Surface-water drainage from the study area through diversion canals was not accounted for in the water budget and may be the reason for a surplus of water in the budget. Even though ground-water flow volume is small compared to other water budget components, ground-water seepage to the wetland surface may still be vital to some wetland functions.
NASA Astrophysics Data System (ADS)
Bowles, C.
2013-12-01
Ecological engineering, or eco engineering, is an emerging field in the study of integrating ecology and engineering, concerned with the design, monitoring, and construction of ecosystems. According to Mitsch (1996) 'the design of sustainable ecosystems intends to integrate human society with its natural environment for the benefit of both'. Eco engineering emerged as a new idea in the early 1960s, and the concept has seen refinement since then. As a commonly practiced field of engineering it is relatively novel. Howard Odum (1963) and others first introduced it as 'utilizing natural energy sources as the predominant input to manipulate and control environmental systems'. Mtisch and Jorgensen (1989) were the first to define eco engineering, to provide eco engineering principles and conceptual eco engineering models. Later they refined the definition and increased the number of principles. They suggested that the goals of eco engineering are: a) the restoration of ecosystems that have been substantially disturbed by human activities such as environmental pollution or land disturbance, and b) the development of new sustainable ecosystems that have both human and ecological values. Here a more detailed overview of eco engineering is provided, particularly with regard to how engineers and ecologists are utilizing multi-dimensional computational models to link ecology and engineering, resulting in increasingly successful project implementation. Descriptions are provided pertaining to 1-, 2- and 3-dimensional hydrodynamic models and their use at small- and large-scale applications. A range of conceptual models that have been developed to aid the in the creation of linkages between ecology and engineering are discussed. Finally, several case studies that link ecology and engineering via computational modeling are provided. These studies include localized stream rehabilitation, spawning gravel enhancement on a large river system, and watershed-wide floodplain modeling of the Sacramento River Valley.
National Waterways Study. Engineering Analysis of Waterways Systems.
1981-08-01
Waterway between Lewiston , Idaho and Bonneville Lock and Dam. Eight locks are present on this segment. All, except Bonneville, have 675’x86’ chambers...Island Bar Every 5 years Dec. 1972 68,000 319 The Columbia River, above the Bonneville Lock to and including the Snake River at Lewiston , Idaho is com
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... structure and is aligned with water management activities during recent flood and drought events in the... operating activities concerned with water management within the Greater Mississippi River Basin. The Greater... require coordination of basin-wide water management activities. b. To serve as a forum for discussion of...
1. VIEW OF LOCKS, LOOKING NORTHEAST Photocopy of photograph, ca. ...
1. VIEW OF LOCKS, LOOKING NORTHEAST Photocopy of photograph, ca. 1980, courtesy of U.S. Engineer Office, St. Louis, Missouri. Original print is on file at Mississippi River Lock and Dam No. 27 in Granite City, Illinois. - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 27, Granite City, Madison County, IL
40 CFR 52.2625 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
...), (h) Jan. 26, 1973 ......do Jan. 31, 1974. Basins Engineering Wheatland 14 (b), (e), (f), (g) June 6, 1974 ......do Apr. 5, 1974. Stauffer Chemical Co Green River 14 (b), (e), (f), (g) ......do ......do.... Allied Chemical Green River 14 (b), (e), (f), (g) ......do ......do Aug. 1, 1976. IMC Corp Colony 14 (b...
40 CFR 52.2625 - Compliance schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
...), (h) Jan. 26, 1973 ......do Jan. 31, 1974. Basins Engineering Wheatland 14 (b), (e), (f), (g) June 6, 1974 ......do Apr. 5, 1974. Stauffer Chemical Co Green River 14 (b), (e), (f), (g) ......do ......do.... Allied Chemical Green River 14 (b), (e), (f), (g) ......do ......do Aug. 1, 1976. IMC Corp Colony 14 (b...
40 CFR 52.2625 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
...), (h) Jan. 26, 1973 ......do Jan. 31, 1974. Basins Engineering Wheatland 14 (b), (e), (f), (g) June 6, 1974 ......do Apr. 5, 1974. Stauffer Chemical Co Green River 14 (b), (e), (f), (g) ......do ......do.... Allied Chemical Green River 14 (b), (e), (f), (g) ......do ......do Aug. 1, 1976. IMC Corp Colony 14 (b...
33 CFR 207.340 - Reservoirs at headwaters of the Mississippi River; use and administration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Reservoirs at headwaters of the... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.340 Reservoirs at headwaters of the Mississippi River; use and administration. (a) Description. These reservoirs include...
33 CFR 207.340 - Reservoirs at headwaters of the Mississippi River; use and administration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Reservoirs at headwaters of the... ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.340 Reservoirs at headwaters of the Mississippi River; use and administration. (a) Description. These reservoirs include...
19. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
19. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. DETAILS FOR PIERS NO. 1, 2, 5 & 6. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. GENERAL PLAN AND ELEVATION OF BRIDGE. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
11. Photographic copy of lines drawing of original construction (24 ...
11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN
In the Chicago area, treated wastewater and storm water flow through the engineered Chicago River system to the Mississippi River, with the goal to protect Lake Michigan from urban discharges. Therefore, under dry weather conditions, nearby Lake Michigan recreational beaches shou...
Ball, Lyndsay B.; Burton, Bethany L.; Powers, Michael H.; Asch, Theodore H.
2015-01-01
To characterize the extent and thickness of lithologic units that may have differing scour potential, the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, has performed several geoelectrical surveys of the lower American River channel and flood plain between Cal Expo and the Rio Americano High School in east Sacramento, California. Additional geotechnical data have been collected by the U.S. Army Corps of Engineers and its contractors. Data resulting from these surveys have been compiled into similar database formats and converted to uniform geospatial datums and projections. These data have been visualized in a digital three-dimensional framework project that can be viewed using freely available software. These data facilitate a comprehensive analysis of the resistivity structure underlying the lower American River corridor and assist in levee system management.
Ground-water conditions in the central Virgin River basin, Utah
Cordova, R.M.; Sandberg, G.W.; McConkie, Wilson
1972-01-01
Water-rights problems have occurred in the central Virgin River basin and are expected to increase as development of the water resources increases. The Utah State Engineer needs a basic knowledge of ground-water conditions and of the relation of ground water to surface water as a first step to understanding and resolving the problems. Accordingly, the State Engineer requested the U. S. Geological Survey to make a ground-water investigation of the central Virgin River basin as part of the Statewide cooperative agreement with the Utah Department of Natural Resources. The investigation was begun July 1, 1968, and fieldwork was completed in August 1970. Detailed information was obtained for the principal aquifers and for recharge, movement, discharge, storage, utilization, and chemical quality of ground water. A progress report (Cordova, Sandberg, and McConkie, 1970) describes the general findings in the first year of the investigation.
Geologic features of dam sites in the Nehalem, Rogue, and Willamette River basins, Oregon, 1935-37
Piper, A.M.
1947-01-01
The present report comprises brief descriptions of geologic features at 19 potential dam sites in the Nehalem, Rogue, and Willamette River basins in western Oregon. The topography of these site and of the corresponding reservoir site was mapped in 1934-36 under an allocation of funds, by the Public Works Administration for river-utilization surveys by the Conservation Branch of the United States Geological Survey. The field program in Oregon has been under the immediate charge of R. O. Helland. The 19 dam sites are distributed as follows: three on the Nehalem River, on the west or Pacific slope of the Oregon Coast range; four on Little Butte Creek and two on Evans Creek, tributaries of the Rogue River in the eastern part of the Klamath Mountains; four on the South and Middle Santiam Rivers, tributaries of the Willamette River from the west slope of the Cascade mountains; and six on tributaries of the Willamette River from the east slope of the Coast Range. Except in the Evans Creek basin, all the rocks in the districts that were studied are of comparatively late geological age. They include volcanic rocks, crystalline rocks of several types, marine and nonmarine sedimentary rocks, and recent stream deposits. The study of geologic features has sought to estimate the bearing power and water-tightness of the rocks at each dam site, also to place rather broad limits on the type of dam for which the respective sites seem best suited. It was not considered necessary to study the corresponding reservoir sites in detail for excessive leakage appears to be unlikely. Except at three of the four site in the Santiam River basin, no test pits have been dug nor exploratory holes drilled, so that geologic features have been interpreted wholly from natural outcrops and from highway and railroad cuts. Because these outcrops and cuts are few, many problems related to the construction and maintenance of dams can not be answered at the this time and all critical features of the sites should be thoroughly explored by test pits and drilled holes before any dam is designed. This applied especially to sites in the Nehalem and Willamette River basins where commonly the cover of timber and brush is dense and the rocks are rather deeply weathered. On the Middle Santiam and South Santiam Rivers, the Cascadia, Greenpeter, and Sweet Home sits have been studies intensively by the United States Engineer Department, whose work included exploration by diamond-drill holes and test pits. Their conclusions as to geologic features are given in a report by McKitrick and have been reviewed by the writer. Data from this source have been used freely in the discussion of the respective sites in this report. The probability of destructive earthquakes in the region appears to be small but is not negligible. Prudence suggests that any high dam should embody features to assure stability against moderately strong earth motions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vavrinec, John; Pearson, Walter H.; Kohn, Nancy P.
2007-05-07
Dredging of the Columbia River navigation channel has raised concerns about dredging-related impacts on Dungeness crabs (Cancer magister) in the estuary, mouth of the estuary, and nearshore ocean areas adjacent to the Columbia River. The Portland District, U.S. Army Corps of Engineers engaged the Marine Sciences Laboratory (MSL) of the U.S. Department of Energy’s Pacific Northwest National Laboratory to review the state of knowledge and conduct studies concerning impacts on Dungeness crabs resulting from disposal during the Columbia River Channel Improvement Project and annual maintenance dredging in the mouth of the Columbia River. The present study concerns potential effects onmore » Dungeness crabs from dredged material disposal specific to the mouth of the Columbia River.« less
10. Photocopied from Photo 1162, Nunns Station Folder, Engineering Department, ...
10. Photocopied from Photo 1162, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. PENSTOCKS, c. 1920? - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
26. Photocopied from Photo 1217, Olmstead Folder #2, Engineering Department, ...
26. Photocopied from Photo 1217, Olmstead Folder #2, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. MACHINE SHOP -- LAB. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
27. Photocopied from Photo 1216, Olmstead Folder #2, Engineering Department, ...
27. Photocopied from Photo 1216, Olmstead Folder #2, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. MACHINE SHOP -- LAB. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
17. Photocopy of a drawing (from the Corps of Engineers ...
17. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 2) FRONT ELEVATION AND PLAN VIEW OF BRIDGE 808 IN 1979 - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE
Sustainable water management under future uncertainty with eco-engineering decision scaling
NASA Astrophysics Data System (ADS)
Poff, N. Leroy; Brown, Casey M.; Grantham, Theodore E.; Matthews, John H.; Palmer, Margaret A.; Spence, Caitlin M.; Wilby, Robert L.; Haasnoot, Marjolijn; Mendoza, Guillermo F.; Dominique, Kathleen C.; Baeza, Andres
2016-01-01
Managing freshwater resources sustainably under future climatic and hydrological uncertainty poses novel challenges. Rehabilitation of ageing infrastructure and construction of new dams are widely viewed as solutions to diminish climate risk, but attaining the broad goal of freshwater sustainability will require expansion of the prevailing water resources management paradigm beyond narrow economic criteria to include socially valued ecosystem functions and services. We introduce a new decision framework, eco-engineering decision scaling (EEDS), that explicitly and quantitatively explores trade-offs in stakeholder-defined engineering and ecological performance metrics across a range of possible management actions under unknown future hydrological and climate states. We illustrate its potential application through a hypothetical case study of the Iowa River, USA. EEDS holds promise as a powerful framework for operationalizing freshwater sustainability under future hydrological uncertainty by fostering collaboration across historically conflicting perspectives of water resource engineering and river conservation ecology to design and operate water infrastructure for social and environmental benefits.
Sustainable water management under future uncertainty with eco-engineering decision scaling
Poff, N LeRoy; Brown, Casey M; Grantham, Theodore E.; Matthews, John H; Palmer, Margaret A.; Spence, Caitlin M; Wilby, Robert L.; Haasnoot, Marjolijn; Mendoza, Guillermo F; Dominique, Kathleen C; Baeza, Andres
2015-01-01
Managing freshwater resources sustainably under future climatic and hydrological uncertainty poses novel challenges. Rehabilitation of ageing infrastructure and construction of new dams are widely viewed as solutions to diminish climate risk, but attaining the broad goal of freshwater sustainability will require expansion of the prevailing water resources management paradigm beyond narrow economic criteria to include socially valued ecosystem functions and services. We introduce a new decision framework, eco-engineering decision scaling (EEDS), that explicitly and quantitatively explores trade-offs in stakeholder-defined engineering and ecological performance metrics across a range of possible management actions under unknown future hydrological and climate states. We illustrate its potential application through a hypothetical case study of the Iowa River, USA. EEDS holds promise as a powerful framework for operationalizing freshwater sustainability under future hydrological uncertainty by fostering collaboration across historically conflicting perspectives of water resource engineering and river conservation ecology to design and operate water infrastructure for social and environmental benefits.
Oxbow Fish Hatchery Snake River Sockeye Salmon Smolt Program, 2008 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Banks, Duane D.
2009-11-14
This contract proposal is in response to the Federal Columbia River Power System Biological Opinion Implementation Plan/Update Proposed Action (UPA) associated with increasing the number of Snake River sockeye smolts by 150,000. To accomplish this proposal the cooperation and efforts of three government entities has been planned (e.g., Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), and the National Marine Fisheries Service (NMFS)). Improvements at the IDFG Eagle Fish Hatchery and NMFS Burley Creek Hatchery will focus on increasing sockeye salmon captive broodstock and egg production. Improvements at the ODFW Oxbow Fish Hatchery willmore » be made to accommodate the incubation, hatching and rearing of 150,000 sockeye salmon smolts for release into Idaho's Sawtooth Valley, Upper Salmon River near IDFG's Sawtooth Fish Hatchery and/or Redfish Lake Creek 1.4 km downstream of Redfish Lake. Modifications to Oxbow Fish Hatchery (ODFW) will include retro-fit existing pond drains so pond cleaning effluent water can be routed to the pollution abatement pond, and modifications to the abatement pond. Also included in this project as an added phase, was the rerouting of the hatchery building effluent water to meet state DEQ guidelines for the use of formalin to treat salmonid eggs. Some additional funding for the described Oxbow Hatchery modifications will come from Mitchell Act Funding. All personnel costs associated with this project will come from Mitchell Act funding. Due to heavy work load issues, being under staffed, and two emergency projects in the spring and summer of 2006, ODFW engineers were not able to complete all plans and get them out for bid in 2006. As a result of these circumstances retro-fitting pond drains and modifications to the abatement pond was carried over into fiscal year 2007-2008. A no cost time extension to the contract was approved by BPA. The format for this report will follow the standard format for Statement of Work Report (SOW), which includes sub-categories Work Element (WE), and within the WE the Milestone Titles.« less
Camprubí, Lino
2012-03-01
After the Spanish Civil War (1936-1939), Francisco Franco's emphasis on dam building became so intense that it is still today associated with his dictatorial rule. Rather than being purely a personal obsession, however, this intensive period of reservoir construction was the result of the influential political role played by engineers from the early years of the regime. During the years 1946-1961 some of these engineers undertook the 'total transformation' of the Noguera Ribagorzana river basin in the Catalonian Pyrenees. But this explicitly 'totalitarian' project encountered important limitations posed both by competing state agencies and by the basin's geology. Analysing the efforts of these engineers allows for new understandings of the Francoist regime and of the place of science, technology, and the landscape within it. Copyright © 2011 Elsevier Ltd. All rights reserved.
2011-07-01
A relatively small portion of this accreted land would be removed by the proposed project and returned to the River. U.S. Army Corps of Engineers... Planting a portion of the site currently utilized for row-crop agriculture to native hardwood tree species. • Gradual sloping of the new River...the change would be localized and so small that it would not be of any measurable or perceptible consequence. Minor: Impact could result in a
1988-05-01
Engineer Water Resources Support Center, Fort Belvoir, Va. Conner, J. W., Pennington, C. H., and Bosley, T. R. 1983. "Larval Fish of Selected Aquatic ...Mississippi River Environmental Program; Report 13 6a NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Aquatic Ecosystem...Jenkins, Aquatic Ecosystem Analysts, PO Box 4188, Fayetteville, Ark. Mr. Stephen P. Cobb, MRC, Vicksburg, Miss., was the project officer and program manager
1990-12-01
ROAD LOCK AND DAM ILLINOIS RIVER L IL CEDARS LOCK AND DAM (KIMBERLY DAM) FOX RIVER L WI CORALVILLE LAKE AND DAM IOWA RIVER R IA DEPERE LOCK AND DAM FOX...Mississippi upstream to Sioux City, Iowa below Gavins Point Dam. Drought results in lower streamflow and a shorter navigation season. Lower streamflow may...897 of the previous month. Classification system. Palmer (1965) used drought data from central Iowa and western Kansas to plot a graph of accumulated
NASA Astrophysics Data System (ADS)
Wang, Bo; Xu, Y. Jun
2018-01-01
Channel bars are a major depositional feature in alluvial rivers and their morphodynamics has been investigated intensively in the past several decades. However, relatively less is known about how channel bars in alluvial rivers respond to river engineering and regulations. In this study, we assessed 30-yr morphologic changes of 30 large emerged bars located in a 223 km reach of the highly regulated Lower Mississippi River from Vicksburg, Mississippi, to the Mississippi-Atchafalaya River diversion. Landsat imagery and river stage data between 1985 and 2015 were utilized to characterize bar morphologic features and quantify decadal changes. Based on bar surface areas estimated with the satellite images at different river stages, a rating curve was developed for each of the 30 bars to determine their volumes. Results from this study show that the highly regulated river reach favored the growth of mid-channel and attached bars, while more than half of the point bars showed degradation. Currently, the mid-channel and attached bars accounted for 38% and 34% of the total volume of the 30 bars. The average volume of a single mid-channel bar is over two times that of an attached bar and over four times that of a point bar. Overall, in the past three decades, the total volume of the studied 30 bars increased by 110,118,000 m3 (41%). Total dike length in a dike field was found mostly contributing to the bar volume increase. Currently, the emerged volume of the 30 bars was estimated approximately 378,183,000 m3. The total bar volume is equivalent to 530 million metric tons of coarse sand, based on an average measured bulk density of 1.4 t/m3 for the bar sediment. The findings show that these bars are large sediment reservoirs.
Williams, Marshall L.; Fosness, Ryan L.; Weakland, Rhonda J.
2012-01-01
The U.S. Geological Survey conducted a bathymetric survey of the Lower Granite Reservoir, Washington, using a multibeam echosounder, and an underwater video mapping survey during autumn 2009 and winter 2010. The surveys were conducted as part of the U.S. Army Corps of Engineer's study on sediment deposition and control in the reservoir. The multibeam echosounder survey was performed in 1-mile increments between river mile (RM) 130 and 142 on the Snake River, and between RM 0 and 2 on the Clearwater River. The result of the survey is a digital elevation dataset in ASCII coordinate positioning data (easting, northing, and elevation) useful in rendering a 3×3-foot point grid showing bed elevation and reservoir geomorphology. The underwater video mapping survey was conducted from RM 107.73 to 141.78 on the Snake River and RM 0 to 1.66 on the Clearwater River, along 61 U.S. Army Corps of Engineers established cross sections, and dredge material deposit transects. More than 900 videos and 90 bank photographs were used to characterize the sediment facies and ground-truth the multibeam echosounder data. Combined, the surveys were used to create a surficial sediment facies map that displays type of substrate, level of embeddedness, and presence of silt.
Towards River Rehabilitation as AN Integrated Approach to Flood Management in Asian Cities
NASA Astrophysics Data System (ADS)
Higgitt, David L.
Flood management in Asian cities has conventionally been approached through structural intervention where floods are regarded as a threat requiring control through engineering infrastructure. Such a command and control paradigm represents a marked transition from the way that monsoon flood regimes have been traditionally perceived across Asia. Rapid urbanization and climate change has imposed increasingly difficult flood management challenges as an extension of impermeable surfaces generates rapid runoff and flash flooding, while cities expand into flood-prone areas. Property and communities are placed at enhanced risk. Urbanization reallocates risk as channel and floodplain modification influences flood regimes, while demands for flood protection at certain locations can redistribute risk to other areas. An increasing concern about flood hazard across Asian cities questions whether conventional solutions reliant on structural intervention are sustainable. Such questioning is mirrored by an alternative paradigm of rehabilitation in integrated river basin management — a recognition that restoring and sustaining functional river ecosystems with high biodiversity is one of the greatest challenges facing society. Rehabilitation initiatives demand a new approach to river basin management which encourage interdisciplinary activity, particularly between engineers, hydrologists, geomorphologists and ecologists. The paper sets out some preliminary ideas from a research project investigating the potential for river rehabilitation as a central tenet of flood management, with a particular focus on Asian cities.
Thompson, Ryan F.; Johnson, Michaela R.; Andersen, Michael J.
2007-01-01
The U.S. Army Corps of Engineers has constructed emergent sandbar habitat on sections of the Missouri River bordering South Dakota and Nebraska downstream from Gavins Point Dam to create and enhance habitat for threatened and endangered bird species. Two areas near river miles 761.3 and 769.8 were selected for construction of emergent sandbar habitat. Pre- and postconstruction data were collected by the U.S. Geological Survey, in cooperation with the U.S. Army Corps of Engineers, to evaluate the success of the habitat management techniques. Data collected include pre- and postconstruction channel-geometry data (bathymetric and topographic) for areas upstream from, downstream from, and within each construction site. Water-velocity data were collected for selected parts of the site near river mile 769.8. Instruments and methods used in data collection, as well as quality-assurance and quality-control measures, are described. Geospatial channel-geometry data are presented for transects of the river channel as cross sections and as geographical information system shapefiles. Geospatial land-surface elevation data are provided for part of each site in the form of a color-shaded relief map. Geospatial water-velocity data also are provided as color-shaded maps and geographical information system shapefiles.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartholomay, R.C.; Orr, B.R.; Liszewski, M.J.
Radiochemical and chemical wastewater discharged since 1952 to infiltration ponds and disposal wells at the Idaho National Engineering Laboratory (INEL) has affected water quality in the Snake River Plain aquifer. The U.S. Geological Survey, in cooperation with the U.S. Department of Energy, maintains a continuous monitoring network at the INEL to determine hydrologic trends and to delineate the movement of radiochemical and chemical wastes in the aquifer. This report presents an analysis of water-level and water-quality data collected from the Snake River Plain aquifer during 1989-91. Water in the eastern Snake River Plain aquifer moves principally through fractures and interflowmore » zones in basalt, generally flows southwestward, and eventually discharges at springs along the Snake River. The aquifer is recharged principally from irrigation water, infiltration of streamflow, and ground-water inflow from adjoining mountain drainage basins. Water levels in wells throughout the INEL generally declined during 1989-91 due to drought. Detectable concentrations of radiochemical constituents in water samples from wells in the Snake River Plain aquifer at the INEL decreased or remained constant during 1989-91. Decreased concentrations are attributed to reduced rates of radioactive-waste disposal, sorption processes, radioactive decay, and changes in waste-disposal practices. Detectable concentrations of chemical constituents in water from the Snake River Plain aquifer at the INEL were variable during 1989-91. Sodium and chloride concentrations in the southern part of the INEL increased slightly during 1989-91 because of increased waste-disposal rates and a lack of recharge from the Big Lost River. Plumes of 1,1,1-trichloroethane have developed near the Idaho Chemical Processing Plant and the Radioactive Waste Management Complex as a result of waste disposal practices.« less
Bedinger, M.S.; Reed, J.E.; Wells, C.J.; Swafford, B.F.
1970-01-01
The Arkansas River Multiple-Purpose Plan will provide year-round navigation on the Arkansas River from near its mouth to Muskogee, Okla., and on the Verdigris River from Muskogee to Catoosa, Okla. The altered regimen in the Arkansas and Verdigris Rivers will affect ground-water conditions in the adjacent alluvial aquifers. In 1957 the U.S. Geological Survey and U.S. Army Corps of Engineers entered into a cooperative agreement for a comprehensive ground-water study of the lower Arkansas and Verdigris River valleys. At the request of the Corps of Engineers, the Geological Survey agreed to provide (1) basic ground-water data before, during, and after construction of the Multiple-Purpose Plan and (2) interpretation and projections of postconstruction ground-water conditions. The data collected were used by the Corps of Engineers in preliminary foundation and excavation estimates and by the Geological Survey as the basis for defining the hydrologic properties of, and the ground-water conditions in, the aquifer. The projections of postconstruction ground-water conditions were used by the Corps of Engineers in the planning, design, construction, and operation of the Multiple-Purpose Plan. Analysis and projections of ground-water conditions were made by use of electrical analog models. These models use the analogy between the flow of electricity in a resistance-capacitance circuit and the flow of a liquid in a porous and permeable medium. Verification provides a test of the validity of the analog to perform as the aquifer would, within the range of historic forces. The verification process consists of simulating the action of historic forces which have acted upon the aquifer and of duplicating the aquifer response with the analog. The areal distribution of accretion can be treated as an unknown and can be determined by analog simulation of the piezometric surface in an aquifer. Comparison of accretion with depth to piezometric surface below land surface shows that accretion decreases with decreasing depth to water level. The decrease in accretion is attributed mostly to the increase in evapotranspiration from the aquifer, and where water levels are very near the land surface, to the rejection of recharge. The maximum accretion and the decrease in accretion with the decrease in depth to water are dependent upon the climate and the thickness and lithology of the fine-grained material overlying the aquifer. Dams on the Arkansas and Verdigris Rivers will impose a direct change in water levels in the aquifers adjacent to the rivers. This change will be attenuated by the resultant change in accretion to the aquifer. The analogs of aquifers in the valleys were used to determine the change in ground-water level from preconstruction to postconstruction conditions.
Field and flume investigations of the effects of logjams and woody debris on streambed morphology
NASA Astrophysics Data System (ADS)
Leung, V.; Montgomery, D. R.; McHenry, M. L.
2014-12-01
Interactions among wood debris, fluid flow and sediment transport in rivers are first-order controls on channel morphodynamics, affecting streambed morphology, sediment transport, sediment storage and aquatic habitat. Woody debris increases the hydraulic and topographic complexity in rivers, leading to a greater diversity of aquatic habitats and an increase in the number of large pools that are important fish habitat and breeding grounds. In the past decade, engineered logjams have become an increasingly used tool in river management for simultaneously decreasing the rate of riverbank migration and improving aquatic habitat. Sediment deposits around woody debris build up riverbanks and counteract bank migration caused by erosion. Previous experiments on flow visualization around model woody debris suggest the amount of sediment scour and deposition are primarily related to the presence of roots and the obstructional area of the woody debris. We present the results of fieldwork and sediment transport experiments of streambed morphology around stationary woody debris. Field surveys on the Hoh River and the Elwha River, WA, measure the local streambed morphology around logjams and individual pieces of woody debris. We quantified the amount of local scour and dam-removal related fine sediment deposition around natural and engineered logjams of varying sizes and construction styles, located in different geomorphic settings. We also quantified the amount of local scour around individual pieces of woody debris of varying sizes, geometries and orientations relative to flow. The flume experiments tested the effects of root geometry and log orientation of individual stationary trees on streambed morphology. The flume contained a deformable sediment bed of medium sand. We find that: 1) the presence of roots on woody debris leads to greater areas of both sediment scour and deposition; and 2) the amount of sediment scour and deposition are related to the wood debris cross-sectional area, oriented orthogonal to flow. A better understanding of the underlying sediment physics and hydraulics around naturally occurring woody debris in rivers can provide guidance and criteria for use in river restoration and engineering as well as scientific insights into a complex interdisciplinary problem.
NASA Astrophysics Data System (ADS)
Gregory, K. J.; Benito, G.; Downs, P. W.
2008-06-01
Significant developments have been achieved in applicable and applied fluvial geomorphology as shown in publications of the last three decades, analyzed as the basis for using results of studies of environmental change as a basis for management. The range of types of publications and of activities are more pertinent to river channel management as a result of concern with sustainability, global climate change, environmental ethics, ecosystem health concepts and public participation. Possible applications, with particular reference to river channel changes, include those concerned with form and process, assessment of channel change, urbanization, channelization, extractive industries, impact of engineering works, historical changes in land use, and restoration with specific examples illustrated in Table 1. In order to achieve general significance for fluvial geomorphology, more theory and extension by modelling methods is needed, and examples related to morphology and process characteristics, integrated approaches, and changes of the fluvial system are collected in Table 2. The ways in which potential applications are communicated to decision-makers range from applicable outputs including publications ranging from review papers, book chapters, and books, to applied outputs which include interdisciplinary problem solving, educational outreach, and direct involvement, with examples summarized in Table 3. On the basis of results gained from investigations covering periods longer than continuous records, a protocol embracing palaeohydrological inputs for application to river channel management is illustrated and developed as a synopsis version (Table 4), demonstrating how conclusions from geomorphological research can be expressed in a format which can be considered by managers.
NASA Astrophysics Data System (ADS)
Nittrouer, Jeffrey
2016-04-01
Owing to their extraordinary natural resources and ecosystem services, deltaic coastlines host hundreds of millions of people worldwide. Societal sustainability on these coastal landscapes is far from certain, however, due to anthropogenic influences including sediment-supply reduction, accelerated subsidence from sub-surface fluid extraction, and leveeing of rivers. The crucial resource in building stable deltaic coastlines is sediment, and the key control on sediment delivery, whether natural or engineered, is by way river channel diversions. Two case studies, based on previous and ongoing research efforts, are presented here to describe the effects of engineered diversions for the removal of river water and associated sediment: the Mississippi River (U.S.A) and the Yellow River (China). Comparatively speaking, these two systems are end-members: Mississippi River water discharge is five times greater than the Yellow River, and yet historically, the Yellow River sediment discharges five times more sediment than the Mississippi system. As such, diversions for the two systems have contrasting goals. During flood events, the Mississippi water stage threatens major metropolitan regions with levee overtopping; spillways are therefore utilized to reduce water flux through the main channel. For the Yellow River, extremely high sediment loads result in significant sedimentation within the main channel, and so there is a concerted effort to divert and shorten the main channel, in order to enhance the water surface slope and increase sediment transport capacity. Interestingly, the net effect of these two projects has been to deposit a significant amount of sediment into the respective receiving basins, which in turn has led to the development of subaerial land. In essence, this represents two compelling case studies documenting how managed (engineered) land building practices can be implemented for other large fluvial-deltaic systems. Observational data collected from field studies of both the Mississippi and Yellow rivers have been used to inform and validate numerical modeling efforts that seek to replicate the morphodynamics of the two diversions. The aim is to evaluate best practices for building deltaic landscape. Based on these research efforts, there are key similarities found for the delta systems: 1) coarse (sandy) sediment is the primary contributor to subaerial delta development, despite the abundance of mud for both rivers; 2) the influx of freshwater into estuarine regions of deltas has tremendous impact on vegetation development, and therefore the cohesion of the deltaic sediment deposit; and 3) it is feasible to produce efficient diversions that maximize sediment delivery and still provide for continued use of the riverine resource (for example, navigation of the channel by vessels). These findings are critical when considering future plans that seek sustainable management practices of other large, anthropic fluvial deltaic systems.
NASA Astrophysics Data System (ADS)
Aronoff, H. I.; Leslie, J. J.; Mittleman, A. N.; Holt, S.
1983-11-01
This manual describes a Shared Time Engineering Program (STEP) conducted by the New England Apparel Manufacturers Association (NEAMA) headquartered in Fall River Massachusetts, and funded by the Office of Trade Adjustment Assistance of the U.S. Department of Commerce. It is addressed to industry association executives, industrial engineers and others interested in examining an innovative model of industrial engineering assistance to small plants which might be adapted to their particular needs.
The CHPRC Columbia River Protection Project Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less
Field intercomparison of channel master ADCP with RiverSonde Radar for measuring river discharge
Spain, P.; Marsden, R.; Barrick, D.; Teague, C.; Ruhl, C.
2005-01-01
The RiverSonde radar makes non-contact measurement of a horizontal swath of surface velocity across a river section. This radar, which has worked successfully at several rivers in the Western USA, has shown encouraging correlation with simultaneous measurements of average currents at one level recorded by an acoustic travel-time system. This work reports a field study intercomparing data sets from a 600 kHz Channel Master ADCP with the RiverSonde radar. The primary goal was to begin to explore the robustness of the radar data as a reliable index of discharge. This site Is at Three Mile Slough in Northern California, USA. The larger intent of the work is to examine variability in space and time of the radar's surface currents compared with subsurface flows across the river section. Here we examine data from a couple of periods with strong winds. ?? 2005 IEEE.
Connecting large-scale coastal behaviour with coastal management of the Rhône delta
NASA Astrophysics Data System (ADS)
Sabatier, François; Samat, Olivier; Ullmann, Albin; Suanez, Serge
2009-06-01
The aim of this paper is to connect the Large Scale Coastal Behaviour (LSCB) of the Rhône delta (shoreface sediment budget, river sediment input to the beaches, climatic change) with the impact and efficiency of hard engineering coastal structures. The analysis of the 1895 to 1974 bathymetric maps as well as 2D modelling of the effect of wave blocking on longshore transport allows us to draw up a conceptual model of the LSCB of the Rhône delta. The river sand input, settled in the mouth area (prodeltaic lobe), favours the advance of adjacent beaches. There is however a very weak alongshore sand feeding of the non-adjacent beaches farther off the mouth. After a mouth shift, the prodelta is eroded by aggressive waves and the sand is moved alongshore to build spits. This conceptual model suggests that there is a "timeshift" between the input of river sediments to the sea and the build up of a beach (nonadjacent to the mouth). Nowadays, as the river channels are controlled by dykes and human interventions, a river shift is not possible. It thus appears unlikely that the river sediments can supply the beaches of the Rhône delta coast. Under these conditions, we must expect that the problems of erosion will continue at Saintes-Maries-de-la-Mer and on the Faraman shore, in areas with chronic erosion where the shoreline retreat has been partially stopped by hard engineering practices in the 1980s. Therefore, these artificially stabilised sectors remain potentially under threat because of profile steepening and downdrift erosion evidenced in this paper by bathymetric profile measurements. In the long-term (1905 to 2003), the temporal analysis of the storm surges and the sea level show very weak but reliable increasing trends. Thus, these climatic agents will be more aggressive on the beaches and on the coastal structures calling their efficiency into question. We also evidence that the hard engineering structures were built in a favourable climatic context during the 1980s meanwhile the storm surges and the sea-level rise are stronger since the 1990s. Regarding to the LSCB of the Rhône delta, and the impact of hard engineering coastal structures, we suggest that classical hard coastal protections are not the best option to protect the coast.
Lewelling, B.R.
2003-01-01
Riverine and palustrine system wetlands are a major ecological component of river basins in west-central Florida. Healthy wetlands are dependent upon the frequency and duration of periodic flooding or inundation. This report assesses the extent, area, depth, frequency, and duration of periodic flooding and the effects of potential surface-water withdrawals on the wetlands along Cypress Creek and the Peace, Alafia, North Prong Alafia, and South Prong Alafia Rivers. Results of the study were derived from step-backwater analysis performed at each of the rivers using the U.S. Army Corps of Engineers Hydrologic Engineering Center-River Analysis System (HEC-RAS) one-dimensional model. The step-backwater analysis was performed using selected daily mean discharges at the 10th, 50th, 70th, 80th, 90th, 98th, 99.5th, and 99.9th percentiles to compute extent of areal inundation, area of inundation, and hydraulic depth to assess the net reduction of areal inundation if 10 percent of the total river flow were diverted for potential withdrawals. The extent of areal inundation is determined by cross-sectional topography and the degree to which the channel is incised. Areal inundation occurs along the broad, low relief of the Cypress Creek floodplain during all selected discharge percentiles. However, areal inundation of the Peace and Alafia Rivers floodplains, which generally have deeply incised channels, occurs at or above discharges at the 80th percentile. The greatest area of inundation along the three rivers generally occurs between the 90th and 98th percentile discharges. The decrease in inundated area resulting from a potential 10-percent withdrawal in discharge ranged as follows: Cypress Creek, 22 to 395 acres (1.7 to 8.4 percent); Peace River, 17 to 1,900 acres (2.1 to 13.6 percent); Alafia River, 1 to 90 acres (1 to 19.6 percent); North Prong Alafia River, 1 to 46 acres (0.7 to 23.4 percent); and South Prong Alafia River, 1 to 75 acres (1.5 to 13.4 percent).
Groundwater controls on river channel pattern
NASA Astrophysics Data System (ADS)
Bätz, Nico; Colombini, Pauline; Cherubini, Paolo; Lane, Stuart N.
2017-04-01
Braided rivers are characterized by high rates of morphological change. However, despite the potential for frequent disturbance, vegetated patches may develop within this system and influence long-term channel dynamics and channel patterns through the "engineering effects" of vegetation. The stabilizing effect of developing vegetation on morphological change has been widely shown by flume experiments and (historic) aerial pictures analysis. Thus, there is a balance between disturbance and stabilization, mediated through vegetation, that may determine the long-term geomorphic and biogeomorphic evolution of the river. It follows that with a change in disturbance frequency relative to the rate of vegetation establishment, a systematic geomorphological shift could occur. Research has addressed how changes in disturbance frequency affect river channel pattern, but has rarely addressed the way in which the stabilizing effects of biogeomorphic succession interact with disturbance frequency to maintain a river in a more dynamic or a less dynamic state. Here, we quantify how the interplay between groundwater access, disturbance frequency and vegetation succession, drive changes in channel pattern. We studied this complex interplay on a transitional gravel-bed river system (braided, wandering, meandering) close to Geneva (Switzerland) - the Allondon River. Dendroecological analysis demonstrate that vegetation growth is driven by groundwater access. Groundwater access conditions the rate of vegetation stabilization at the sub-reach scale and, due to a reduction in flood-related disturbance frequency over the last 50 years, drives a change in channel pattern. Where groundwater is shallower, vegetation encroachment rates were high and as flood-related disturbance decreased, the river has shifted towards a meandering state. Where groundwater was deeper, vegetation growth was limited by water-access and thus vegetation encroachment rates were low. Even though there was a reduction in flood disturbance, it was still sufficient to maintain a wandering/braided state. Thus, it appears that access to groundwater can control river channel pattern through its impact upon the "engineering effects" of vegetation. The results are important for river management as they highlight the non-linearity of developing vegetation in dynamic alluvial floodplains and the importance of considering the wider environmental setting and associated feedbacks between biotic and abiotic river components in defining long-term geomorphological river response.
8. Photocopied from unnumbered photo, Nunns Station Folder, Engineering Department, ...
8. Photocopied from unnumbered photo, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. EXTERIOR VIEW. C. 1898. - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
11. Photocopied from Photo #1, Nunns Station Folder, Engineering Department, ...
11. Photocopied from Photo #1, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. 'INTERIOR NUNNS STATION.' c. 1898. - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ) COMPLETION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND ...
41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND CENTRE CASTING OF CAST STEEL, MASONRY CASTING OF CAST IRON CASTING, FOR MINNEAPOLIS STEEL ARCH (4 x 5 negative) - Steel Arch Bridge, Hennepin Avenue spanning west channel of Mississippi River, Minneapolis, Hennepin County, MN
1981-08-01
approval. CARNEY M. TERZLAN, KDIBER Design Branch Engineering Division Water\\ontrol Brancr%.J Engineering Division ARAiQAST MANTESI, CHIRA Geotechnical...issued to Hayden, Harding & Buchanan, Inc. on 26 June 1981 by William E. Hodgson Jr., Colonel, Corps of Engineers. Contract No. DACW 33-80-C-0006 has been
9. EXTERIOR VIEW OF BALTIMORE FAN HOUSE LOOKING NORTHEAST The ...
9. EXTERIOR VIEW OF BALTIMORE FAN HOUSE LOOKING NORTHEAST The brick and concrete construction of the engine room, airways, and chimney are evident. The shaft housing and flywheel of the Allis- Chalmers Corliss steam engine are visible through the window of the engine room. - Dorrance Colliery Fan Complex, South side of Susquehanna River at Route 115 & Riechard Street, Wilkes-Barre, Luzerne County, PA
A new modelling framework and mitigation measures for increased resilience to flooding
NASA Astrophysics Data System (ADS)
Valyrakis, Manousos; Alexakis, Athanasios; Solley, Mark
2015-04-01
Flooding in rivers and estuaries is amongst the most significant challenges our society has yet to tackle effectively. Use of floodwall systems is one of the potential measures that can be used to mitigate the detrimental socio-economical and ecological impacts and alleviate the associated costs of flooding. This work demonstrates the utility of such systems for a case study via appropriate numerical simulations, in addition to conducting scaled flume experiments towards obtaining a better understanding of the performance and efficiency of the flood-wall systems. At first, the results of several characteristic inundation modeling scenarios and flood mitigation options, for a flood-prone region in Scotland. In particular, the history and hydrology of the area are discussed and the assumptions and hydraulic model input (model geometry including instream hydraulic structures -such as bridges and weirs- river and floodplain roughness, initial and boundary conditions) are presented, followed by the model results. Emphasis is given on the potential improvements brought about by mitigating flood risk using flood-wall systems. Further, the implementation of the floodwall in mitigating flood risk is demonstrated via appropriate numerical modeling, utilizing HEC-RAS to simulate the effect of a river's rising stage during a flood event, for a specific area. The later part of this work involves the design, building and utilization of a scaled physical model of a flood-wall system. These experiments are carried out at one of the research flumes in the Water Engineering laboratory of the University of Glasgow. These involve an experimental investigation where the increase of force applied on the floodwall is measured for different degrees of deflection of the water in the stream, under the maximum flow discharge that can be carried through without exceeding the floodwall height (and accounting for the effect of super-elevation). These results can be considered upon the implementation phase of floodwalls, when the floodwalls are placed at any arrangement other than parallel to the flow (e.g. along river bends in meandering channels or at river junctions). Such considerations can lead to site-specific optimal designs of direct flood defenses with the rising floodwall system, both in terms of product performance as well as cost efficiency.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal... enforcement of regulation. SUMMARY: The Coast Guard will enforce a segment of the Safety Zone; Brandon Road....S. Army Corps of Engineers' dispersal barrier maintenance operations. During the enforcement period...
33 CFR 334.560 - Banana River at Patrick Air Force Base, Fla.; restricted area.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Banana River at Patrick Air Force Base, Fla.; restricted area. 334.560 Section 334.560 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE DANGER ZONE AND RESTRICTED AREA REGULATIONS § 334.560 Banana...
76 FR 21633 - Disestablishing Special Anchorage Area 2; Ashley River, Charleston, SC
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
...-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey... or shapes required by Rule 30 of the Inland Navigation Rules (33 U.S.C. 2030). Ashley River Properties and the Ripley Light Yacht Club submitted a permit application to the Army Corps of Engineers to...
Code of Federal Regulations, 2010 CFR
2010-07-01
... reservoir; logging. 207.330 Section 207.330 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT... reservoir; logging. (a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations...
Code of Federal Regulations, 2011 CFR
2011-07-01
... reservoir; logging. 207.330 Section 207.330 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT... reservoir; logging. (a) Parties engaged in the transportation of loose logs, timbers, and rafts of logs, poles, posts, ties, or pulpwood, on the waters described in this section, shall conduct their operations...
33 CFR 207.60 - Federal Dam, Hudson River, Troy, N.Y.; pool level.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Federal Dam, Hudson River, Troy, N.Y.; pool level. 207.60 Section 207.60 Navigation and Navigable Waters CORPS OF ENGINEERS..., N.Y.; pool level. (a) Whenever the elevation of the pool created by the Federal dam at Troy, N.Y...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION... reported to the nearest lock. The report shall include information as to the number of loose barges, their... of the progress being made in bringing the barges under control so that he can initiate whatever...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION... reported to the nearest lock. The report shall include information as to the number of loose barges, their... of the progress being made in bringing the barges under control so that he can initiate whatever...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION... reported to the nearest lock. The report shall include information as to the number of loose barges, their... of the progress being made in bringing the barges under control so that he can initiate whatever...
76 FR 48070 - Regulated Navigation Area, Zidell Waterfront Property, Willamette River, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... Regulated Navigation Area (RNA) at the Zidell Waterfront Property located on the Willamette River in Portland, Oregon. This RNA is necessary to preserve the integrity of an engineered sediment cap as part of... shoreline soil in these areas. As such, this RNA is necessary to help ensure the cap is protected and will...
Kyiv Small Rivers in Metropolis Water Objects System
NASA Astrophysics Data System (ADS)
Krelshteyn, P.; Dubnytska, M.
2017-12-01
The article answers the question, what really are the small underground rivers with artificial watercourses: water bodies or city engineering infrastructure objects? The place of such rivers in metropolis water objects system is identified. The ecological state and the degree of urbanization of small rivers, as well as the dynamics of change in these indicators are analysed on the Kiev city example with the help of water objects cadastre. It was found that the registration of small rivers in Kyiv city is not conducted, and the summary information on such water objects is absent and is not taken into account when making managerial decisions at the urban level. To solve this problem, we propose to create some water bodies accounting system (water cadastre).
76 FR 4365 - Renewal of the Trinity River Adaptive Management Working Group
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Management Working Group AGENCY: Office of the Secretary, Interior. ACTION: Notice. SUMMARY: The Secretary of... Trinity River Adaptive Management Working Group (Working Group) for 2 years. The Working Group provides... Road, Arcata, CA 95521; 707-822-7201. SUPPLEMENTARY INFORMATION: The Working Group conducts its...
78 FR 5830 - Renewal of the Trinity River Adaptive Management Working Group
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Management Working Group AGENCY: Office of the Secretary, Interior. ACTION: Notice. SUMMARY: The Secretary of... Trinity River Adaptive Management Working Group (Working Group) for 2 years. The Working Group provides... Road, Arcata, CA 95521; 707-822-7201. SUPPLEMENTARY INFORMATION: The Working Group conducts its...
NASA Astrophysics Data System (ADS)
Zhou, Meirong; Xia, Junqiang; Lu, Jinyou; Deng, Shanshan; Lin, Fenfen
2017-05-01
In the past 50 years, the Shishou reach in the middle Yangtze River underwent significant channel evolution owing to the implementation of an artificial cutoff, the construction of bank revetment works and the operation of the Three Gorges Project (TGP). Based on the measured hydrological data and topographic data, the processes of channel evolution in this reach were investigated mainly from the adjustments in planform and cross-sectional geometries. The variation in planform geometry obtained in this study indicates that (i) the artificial cutoff at Zhongzhouzi caused the river regime to adjust drastically, with the mean rate of thalweg migration at reach scale of 42.0 m/a over the period 1966-1975; (ii) then the effect of this artificial cutoff reduced gradually, with the mean migration rate decreasing to < 30 m/a in 1975-1993, while it increased to > 40 m/a owing to the occurrence of high water levels in 1993-1998; and (iii) the average annual rate of thalweg migration decreased to 29.3 m/a because of the impacts of various bank protection engineering and the TGP operation during the period 2002-2015. However, remarkable thalweg migration processes still occurred in local regions after the TGP operation, which resulted in significant bankline migration in local reaches of Beimenkou, Shijiatai, and Tiaoxiankou. In addition, the adjustments of bankfull channel geometry were investigated at section and reach scales after the TGP operation. Calculated results show that lateral channel migration in this reach was restricted by various river regulation works and that channel evolution was mainly characterized by an increase in bankfull depth and cross-sectional area. Empirical relationships were developed between the reach-scale bankfull dimensions (depth and area), the bankfull widths at specified sections, and the previous 5-year average fluvial erosion intensity during flood seasons, with high correlation degrees between them being obtained.
2002-07-01
Monthly. Caspian Tern Working Group Developing a plan to reduce smolt predation by Caspian terns nesting in the Columbia River estuary. As needed...Environment and Public Works, U.S. SenateJuly 2002 COLUMBIA RIVER BASIN SALMON AND STEELHEAD Federal Agencies’ Recovery Responsibilities... COLUMBIA RIVER BASIN SALMON AND STEELHEAD: Federal Agencies Recovery Responsibilities, Expenditures and Actions Contract Number Grant Number Program
NASA Astrophysics Data System (ADS)
Béal, D.; Piégay, H.; Arnaud, F.; Rollet, A.; Schmitt, L.
2011-12-01
Aerial high resolution visible imagery allows producing large river bathymetry assuming that water depth is related to water colour (Beer-Bouguer-Lambert law). In this paper we aim at monitoring Rhine River geometry changes for a diachronic study as well as sediment transport after an artificial injection (25.000 m3 restoration operation). For that a consequent data base of ground measurements of river depth is used, built on 3 different sources: (i) differential GPS acquisitions, (ii) sounder data and (iii) lateral profiles realized by experts. Water depth is estimated using a multi linear regression over neo channels built on a principal component analysis over red, green and blue bands and previously cited depth data. The study site is a 12 km long reach of the by-passed section of the Rhine River that draws French and German border. This section has been heavily impacted by engineering works during the last two centuries: channelization since 1842 for navigation purposes and the construction of a 45 km long lateral canal and 4 consecutive hydroelectric power plants of since 1932. Several bathymetric models are produced based on 3 different spatial resolutions (6, 13 and 20 cm) and 5 acquisitions (January, March, April, August and October) since 2008. Objectives are to find the optimal spatial resolution and to characterize seasonal effects. Best performances according to the 13 cm resolution show a 18 cm accuracy when suspended matters impacted less water transparency. Discussions are oriented to the monitoring of the artificial reload after 2 flood events during winter 2010-2011. Bathymetric models produced are also useful to build 2D hydraulic model's mesh.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Gary E.; Thom, Ronald M.; Whiting, Allan H.
The Bonneville Power Administration (BPA), in coordination with the U. S. Army Corps of Engineers (COE) and NOAA Fisheries, originated this project (BPA Project No. 2002-076; Contract No. DE-AC06-76RL01830, Release No. 652-24). Their intent was to develop a useful habitat restoration plan for the lower Columbia River and estuary to help guide restoration efforts and fulfill Reasonable and Prudent Alternative Action 159 of the 2000 National Marine Fisheries Service Biological Opinion on operation of the Federal Columbia River Power System. This document focuses on salmon habitat, although its ecosystem-based approach necessarily affects other species as well. Salmon habitat restoration ismore » best undertaken within the context of other biota and physical processes using an ecosystem perspective. The anticipated audience for the plan includes entities responsible for, interested in, or affected by habitat restoration in the lower Columbia River and estuary. Timeframes to apply this plan extend from the immediate (2003-2004) to the near-term (2005-2006) to the long-term (2007 and beyond). We anticipate and encourage that the plan be revised as new knowledge and experience are attained. A team comprised of the Columbia River Estuary Study Taskforce (CREST), the Lower Columbia River Estuary Partnership (Estuary Partnership), and Pacific Northwest National Laboratory (PNNL) wrote this document. The BPA and the COE, as the responsible Action Agencies, provided technical oversight. The Estuary Partnership's Science Work Group, NOAA Fisheries Habitat Conservation Division, Northwest Power Planning Council (NPPC) staff, and state and tribal fisheries management agencies reviewed drafts. The Independent Scientific Advisory Board of the NPPC reviewed and commented on the 90% draft. Revisions were incorporated into the final draft document subsequently released for public review. Extensive efforts were made to ensure a sound technical and policy basis and to solicit input from all interested parties.« less
Engineering properties of concrete with partial utilization of used foundry sand.
Manoharan, Thiruvenkitam; Laksmanan, Dhamothiran; Mylsamy, Kaliyannan; Sivakumar, Pandian; Sircar, Anirbid
2018-01-01
Solid wastes generated from manufacturing industries are increasing at an alarming rate and it is consistently increasing. One such industrial solid waste is Used Foundry Sand (UFS). On the other hand, fine aggregates involved in the concrete are generally river sand, which is scarce, high cost and excavation of the river sand that promote environmental degradation. So, there is an urge to find some alternative solution to dispose UFS and to limit the use of river sand. In this research work, river sand was partially replaced by UFS. The percentage replacements were 0, 5, 10, 15, 20 and 25 wt% respectively. Experimental investigations were carried out to evaluate the mechanical, durability and micro-structural properties of M20 concrete at the age of 7, 28 and 91 day. XRD (X-ray Diffraction), EDX (Energy Dispersive X-ray) and optical-microscopic imaging analysis were performed to identify the presence of various compounds and micro cracks in the concrete with UFS. Comparative studies on control mix against trial mix were carried out. It was found that compression strength, flexural strength and modulus of elasticity were approximately constant up to 20 wt% UFS and decreased with further addition. Whereas, split tensile strength was increased after 20 wt% addition but it affects the other properties of concrete. The durability test results showed that the resistance of concrete against abrasion and rapid chloride permeability of the concrete mixture containing UFS up to 20 wt% were almost similar to the values of control mix. The findings suggest that UFS can effectively replace river sand. However, it is recommended that the replacement should not exceed 20 wt%. Copyright © 2017. Published by Elsevier Ltd.
Ecological restoration and effect investigation of a river wetland in a semi-arid region, China
NASA Astrophysics Data System (ADS)
Xu, S.; Jiang, X.; Liu, Y.; Fu, Y.; Zhao, Q.
2015-05-01
River wetlands are heavily impacted by human intervention. The degradation and loss of river wetlands has made the restoration of river ecosystems a top priority. How to rehabilitate rivers and their services has been a research focus. The main goal of it is to restore the river wetland ecosystems with ecological methods. The Gudong River was selected as a study site in Chaoyang city in this study. Based on the analysis of interference factors in the river wetland degradation, a set of restoration techniques were proposed and designed for regional water level control, including submerged dikes, ecological embankments, revegetation and dredging. The restoration engineering has produced good results in water quality, eco-environment, and landscape. Monthly reports of the Daling River show that the water quality of Gudong River was better than Grade III in April 2013 compared with Grade V in May 2012. The economic benefit after restoration construction is 1.71 million RMB per year, about 1.89 times that before. The ratio of economic value, social value and eco-environmental value is 1:4:23.
Lewelling, B.R.
2004-01-01
Riverine and palustrine wetlands are a major ecological component of river basins in west-central Florida. Healthy wetlands are dependent, in part, upon the frequency and duration of periodic flooding or inundation. This report assesses the extent, area, depth, frequency, and duration of periodic flooding and the effects of potential surface-water withdrawals on wetlands along five river systems in the upper Hillsborough River watershed: Hillsborough and New Rivers, Blackwater and Itchepackesassa Creeks, and East Canal. Results of the study were derived from step-backwater analyses performed for each of the river systems using the U.S. Army Corps of Engineers Hydrologic Engineering Center-River Analysis System (HEC-RAS) one-dimensional model. Step-backwater analyses were performed based on daily mean discharges at the 10th, 50th, 70th, 80th, 90th, 95th, 99.5th, and 99.97th percentiles for selected periods. The step-backwater analyses computed extent of inundation, area of inundation, and hydraulic depth. An assessment of the net reduction of areal inundation for each of the selected percentile discharges was computed if 10 percent of the total river flow were diverted for potential withdrawals. The extent of areal inundation at a cross section is controlled by discharge volume, topography, and the degree to which the channel is incised. Areal inundation can occur in reaches characterized by low topographic relief in the upper Hillsborough watershed during most, if not all, selected discharge percentiles. Most river systems in the watershed, however, have well defined and moderately incised channels that generally confine discharges within the banks at the 90th percentile. The greatest increase in inundated area along the five river systems generally occurred between the 95th to 99.5th percentile discharges. The decrease in inundated area that would result from a potential 10-percent discharge withdrawal at the five river systems ranged as follows: Hillsborough River, 7 to 940 acres (2.0 to 6.0 percent); and New River, 0.2 to 58.9 acres (0 to 11.9 percent); Blackwater Creek, 3.3 to 148 acres (2.2 to 9.4 percent); Itchepackesassa Creek, 1.0 to 104 acres (0.9 to 10.8 percent); and East Canal 0.7 to 34.6 acres (0.5 to 7.6 percent).
Krahulik, Justin R.; Densmore, Brenda K.; Anderson, Kayla J.; Kavan, Cory L.
2015-01-01
Discharge was measured at chute survey sites, in both the main channel of the Missouri River upstream from the chute and the chute. Many chute entrances and control structures were damaged by floodwater during the 2011 Missouri River flood, allowing a larger percentage of the total Missouri River discharge to flow through the chute than originally intended in the chute design. Measured discharge split between the main channel and the chute at most chutes was consistent with effects of the 2011 Missouri River flood damages and a larger percent of the total Missouri River discharge was flowing through the chute than originally intended. The U.S. Army Corps of Engineers repaired many of these chutes in 2012 and 2013, and the resulting hydraulic changes are reflected in the discharge splits.
77 FR 19544 - Regulated Navigation Area, Zidell Waterfront Property, Willamette River, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-02
... damage the engineered sediment cap. DATES: This rule is effective May 2, 2012. ADDRESSES: Comments and..., dredging, grounding of large vessels, deployment of barge spuds, etc. Such damage could disrupt the... will do so by prohibiting certain maritime activities that could disturb or damage it. The engineered...
9. Photocopied from Photo 1161, Nunns Station Folder, Engineering Department, ...
9. Photocopied from Photo 1161, Nunns Station Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. VIEW OF SITE SHOWING PENSTOCKS. c. 1920.? - Telluride Power Company, Nunn Hydroelectric Plant, Southeast side of Provo River, 300 feet West of US Route 189, Orem, Utah County, UT
23. Photocopied from Photo 664OLM, Olmstead Folder #1, Engineering Department, ...
23. Photocopied from Photo 664-OLM, Olmstead Folder #1, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. INTERIOR OF STATION, APRIL 8, 1909. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
21. Photocopied from blueprint, Olmstead Station Miscellaneous Drawings Folder, Engineering ...
21. Photocopied from blueprint, Olmstead Station Miscellaneous Drawings Folder, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. 'STATION GROUNDS, TELLURIDE POWER CO., PROVO, UTAH.' MAP,1903. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
22. Photocopied from Photo 505OLM, Olmstead Folder #1, Engineering Department, ...
22. Photocopied from Photo 505-OLM, Olmstead Folder #1, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. OLD PENSTOCKS, JANUARY 25, 1908. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
24. Photocopied from Photo 669OLM, Olmstead Folder #1, Engineering Department, ...
24. Photocopied from Photo 669-OLM, Olmstead Folder #1, Engineering Department, Utah Power & Light Co., Salt Lake City, Utah. NEW PENSTOCK, APRIL 8, 1909. - Telluride Power Company, Olmsted Hydroelectric Plant, mouth of Provo River Canyon West of U.S. Route 189, Orem, Utah County, UT
2. Photocopied from Photo 11456, Wheelon Station Special Folder, Engineering ...
2. Photocopied from Photo 11456, Wheelon Station Special Folder, Engineering Dept., Utah Power & Light Co., Salt Lake City, Utah. 'WHEELON HYDRO-ELECTRIC PLANT (7125 KW). INTERIOR OF MAIN BUILDING SHOWING FOUR 1000 KW UNITS. NOV 1914.' - Utah Sugar Company, Wheelon Hydoelectric Plant, Bear River, Fielding, Box Elder County, UT