Sample records for road construction

  1. 36 CFR 223.83 - Contents of prospectus.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... specified roads to be constructed. (16) The estimated road construction cost and the estimated public works..., the prospectus shall also include: (1) The road standards applicable to construction of permanent... permanent roads. (3) A statement explaining how the Forest Service intends to perform road construction by...

  2. [Characteristics of fugitive dust emission from paved road near construction activities].

    PubMed

    Tian, Gang; Fan, Shou-Bin; Li, Gang; Qin, Jian-Ping

    2007-11-01

    Because of the mud/dirt carryout from construction activities, the silt loading of paved road nearby is higher and the fugitive dust emission is stronger. By sampling and laboratory analysis of the road surface dust samples, we obtain the silt loading (mass of material equal to or less than 75 micromaters in physical diameter per unit area of travel surface) of paved roads near construction activities. The result show that silt loading of road near construction activities is higher than "normal road", and silt loading is negatively correlated with length from construction's door. According to AP-42 emission factor model of fugitive dust from roads, the emission factor of influenced road is 2 - 10 times bigger than "normal road", and the amount of fugitive dust emission influenced by one construction activity is "equivalent" to an additional road length of approximately 422 - 3 800 m with the baseline silt loading. Based on the spatial and temporal distribution of construction activities, in 2002 the amount of PM10 emission influenced by construction activities in Beijing city areas account of for 59% of fugitive dust from roads.

  3. 76 FR 22076 - Bussel 484, Idaho Panhandle National Forests, Idaho, Shoshone County

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... miles of system road construction on National Forest System lands, 0.2 miles of road construction across... construction, 5.4 miles of road reconstruction, installing effective motorized vehicle restriction devices...,137 acres; approximately 5.1 miles of system road construction, 0.5 miles of temporary road...

  4. 76 FR 22361 - Lakeview-Reeder Fuels Reduction, Idaho Panhandle National Forests, Idaho, Bonner County

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... miles of road maintenance, 2.4 miles of system road construction and 0.7 miles of temporary road... construction, and 0.7 miles of temporary road construction. Responsible Official The Forest Supervisor of the... timber harvest and fuel treatments, as well as miles and locations of road maintenance, construction...

  5. 47. Spring 1935 Harold J. Cook, photographer "Summit Road construction. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Spring 1935 Harold J. Cook, photographer "Summit Road construction. Early stage of road tunnel construction, while tunnel was being driven on Summit Road, Scotts Bluff National Monument." - Scotts Bluff Summit Road, Gering, Scotts Bluff County, NE

  6. 36 CFR 223.41 - Payment when purchaser elects government road construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... government road construction. 223.41 Section 223.41 Parks, Forests, and Public Property FOREST SERVICE... Conditions and Provisions § 223.41 Payment when purchaser elects government road construction. Each contract having a provision for construction of specified roads with total estimated construction costs of $50,000...

  7. 36 CFR 294.23 - Road construction and reconstruction in Idaho Roadless Areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... safety; (v) Road reconstruction is needed to implement a road safety improvement project on a road... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Road construction and..., DEPARTMENT OF AGRICULTURE SPECIAL AREAS Idaho Roadless Area Management § 294.23 Road construction and...

  8. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  9. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  10. 36 CFR 223.47 - Date of completion of permanent road construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permanent road construction. 223.47 Section 223.47 Parks, Forests, and Public Property FOREST SERVICE... Conditions and Provisions § 223.47 Date of completion of permanent road construction. (a) The date of completion of permanent road construction obligations as set forth in the Notice of Sale shall be...

  11. Cost estimators for construction of forest roads in the central Appalachians

    Treesearch

    Deborah, A. Layton; Chris O. LeDoux; Curt C. Hassler; Curt C. Hassler

    1992-01-01

    Regression equations were developed for estimating the total cost of road construction in the central Appalachian region. Estimators include methods for predicting total costs for roads constructed using hourly rental methods and roads built on a total-job bid basis. Results show that total-job bid roads cost up to five times as much as roads built than when equipment...

  12. Literature review of levels and determinants of exposure to potential carcinogens and other agents in the road construction industry.

    PubMed

    Burstyn, I; Kromhout, H; Boffetta, P

    2000-01-01

    Workers in the road construction industry include asphalt plant, ground construction, and road paving workers. These individuals can be exposed to a wide range of potentially hazardous substances. A summary of levels of exposure to different substances measured during road construction is presented. In modern road paving, workers typically are exposed to 0.1 to 2 mg/m3 of bitumen fume, which includes 10 to 200 ng/m3 of benzo(a)pyrene. Sampling strategies and analytical methods employed in each reviewed survey are described briefly. The published reports provide some insight into the identity of factors that influence exposure to bitumen among road construction workers: type of work performed, meteorological conditions, temperature of paved asphalt. However, there is a lack of (a) comprehensive and well-designed studies that evaluate determinants of exposure to bitumen in road construction, and (b) standard methods for bitumen sampling and analysis. Information on determinants of other exposures in road construction is either absent or limited. It is concluded that data available through published reports have limited value in assessing historical exposure levels in the road construction industry.

  13. 36 CFR 223.84 - Small business bid form provisions on sales with specified road construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provisions on sales with specified road construction. 223.84 Section 223.84 Parks, Forests, and Public... specified road construction. For each sale described in § 223.82(b), the bid form must include provision for a small business concern: (a) To elect road construction by the Forest Service and where such...

  14. Estimating diesel fuel consumption and carbon dioxide emissions from forest road construction

    Treesearch

    Dan Loeffler; Greg Jones; Nikolaus Vonessen; Sean Healey; Woodam Chung

    2009-01-01

    Forest access road construction is a necessary component of many on-the-ground forest vegetation treatment projects. However, the fuel energy requirements and associated carbon dioxide emissions from forest road construction are unknown. We present a method for estimating diesel fuel consumed and related carbon dioxide emissions from constructing forest roads using...

  15. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...

  16. 78 FR 63279 - Public Notice for Waiver of Aeronautical Land-Use Assurance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... Commissioners of Orange County for the construction of County Road CR 300 South/Airport Road to facilitate... property for a nominal sum of One Dollar and zero cents ($1.00) for the construction of County Road CR 300 South/Airport Road. Construction of the road will facilitate access to the airport. The aforementioned...

  17. 30 CFR 817.151 - Primary roads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section. (a) Certification. The construction or reconstruction of primary roads shall be certified in a... authorizes land surveyors to certify the construction or reconstruction of primary roads, a qualified registered professional land surveyor, with experience in the design and construction of roads. The report...

  18. 30 CFR 816.151 - Primary roads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... this section. (a) Certification. The construction or reconstruction of primary roads shall be certified... State which authorizes land surveyors to certify the construction or reconstruction of primary roads, a qualified registered professional land surveyor with experience in the design and construction of roads. The...

  19. 36 CFR 294.25 - Mineral activities in Idaho Roadless Areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... recommend, authorize, or consent to road construction, road reconstruction, or surface occupancy associated... construction or road reconstruction associated with mineral leases in Idaho Roadless Areas designated as Backcountry/Restoration. Surface use or occupancy without road construction or reconstruction is permissible...

  20. 36 CFR 294.23 - Road construction and reconstruction in Idaho Roadless Areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be mitigated by road maintenance. Road realignment may occur under this subsection only if the road.... (e) Road maintenance. Maintenance of temporary and forest roads is permissible in Idaho Roadless... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Road construction and...

  1. 36 CFR 223.62 - Timber purchaser road construction credit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... deposits for slash disposal and road maintenance. As used in this section estimated construction costs... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber purchaser road... § 223.62 Timber purchaser road construction credit. Appraisal may also establish stumpage value as if...

  2. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...

  3. 75 FR 69619 - East Reservoir Project; Kootenai National Forest, Lincoln County, MT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... harvest. Vegetation treatments total approximately 13,000 acres of treated area. (2) Road management includes new road construction, road storage and adding existing, undetermined roads to the National Forest Service road system. Approximately 2.04 miles of new road construction is proposed. Approximately 40 miles...

  4. Conceptual design and analysis of roads and road construction machinery for initial lunar base operations

    NASA Technical Reports Server (NTRS)

    Sines, Jeffrey L.; Banks, Joel; Efatpenah, Keyanoush

    1990-01-01

    Recent developments have made it possible for scientists and engineers to consider returning to the Moon to build a manned lunar base. The base can be used to conduct scientific research, develop new space technology, and utilize the natural resources of the Moon. Areas of the base will be separated, connected by a system of roads that reduce the power requirements of vehicles traveling on them. Feasible road types for the lunar surface were analyzed and a road construction system was designed for initial lunar base operations. A model was also constructed to show the system configuration and key operating features. The alternate designs for the lunar road construction system were developed in four stages: analyze and select a road type; determine operations and machinery needed to produce the road; develop machinery configurations; and develop alternates for several machine components. A compacted lunar soil road was selected for initial lunar base operations. The only machinery required to produce this road were a grader and a compactor. The road construction system consists of a main drive unit which is used for propulsion, a detachable grader assembly, and a towed compactor.

  5. 77 FR 27013 - Ketchikan-Misty Fiords Ranger District; Tongass National Forest; Alaska; Saddle Lakes Timber Sale...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... (non-system) road. All new road construction would be closed to motorized use after timber harvest..., road construction and reconstruction, and silvicultural practices used; (2) access management measures... integrity objectives for visual priority routes; (3) the effects of timber harvest and road construction on...

  6. Identifying unstable sites on logging roads

    Treesearch

    R. M. Rice; J. Lewis

    1986-01-01

    Logging roads are an important source of forestry-related erosion. The amount of erosion on a forest road is determined by the interaction between how the road is constructed and maintained and the environment in which it is built. The roads in this study were constructed with large bulldozers, and most excavated material was sidecast. The roads studied were...

  7. Geo-Hazards and Mountain Road Development in Nepal: Understanding the Science-Policy-Governance Interface

    NASA Astrophysics Data System (ADS)

    Dugar, Sumit; Dahal, Vaskar

    2015-04-01

    The foothills of Nepalese Himalayas located in the neotectonic mountain environment are among some of the most unstable and geomorphologically dynamic landscapes in the world. Young fold mountains in this region are characterized by complex tectonics that influence the occurrence of earthquakes, while climatic processes such as intense orographic rainfall often dictate the occurrence of floods and landslides. Development of linear infrastructures, such as roads, in mountainous terrain characterized by high relief and orogeny is considerably challenging where the complexity of landscape in steep and irregular topography, difficult ground conditions and weak geology, presents engineers and planners with numerous difficulties to construct and maintain mountain roads. Whilst application of engineering geology, geomorphic interpretation of terrain in terms of physiography and hydrology, and identification of geo-hazards along the road corridor is critical for long term operation of mountain roads, low-cost arterial roads in the Himalayan foothills generally fail to incorporate standard road slope engineering structures. This research provides unique insights on policy and governance issues in developing mountainous countries such as Nepal, where achieving a sound balance between sustainability and affordability is a major challenge for road construction. Road development in Nepal is a complex issue where socio-economic and political factors influence the budget allocation for road construction in rural hilly areas. Moreover, most mountain roads are constructed without any geological or geo-technical site investigations due to rampant corruption and lack of adequate engineering supervision. Despite having good examples of rural road construction practices such as the Dharan-Dhankuta Road in Eastern Nepal where comprehensive terrain-evaluation methods and geo-technical surveys led to an improved understanding of road construction, learnings from this project have not informed other road development schemes in Nepal. Geomorphological surveys and robust geo-hazard assessments that factor the spatial and temporal dimensions of the seismic, fluvial and sediment hazards along the road corridor are critical for sustainable development of mountain roads. However, scientific and technical research studies seldom inform mountain road development primarily due to lack of co-ordination between the respective government agencies, access to journal papers in developing countries and unwillingness to adopt novel interventions in rural road construction practices. These challenges are further exacerbated by weak governance and lack of proper policy enforcement that often leads to construction of poorly engineered roads, thereby increasing the risk of rural infrastructural damage from geo-hazards. Though there exists a disconnect between the science-policy-governance interface where information on geo-hazards is neglected in mountain road development due to lack of scientific research and government apathy, there is an opportunity to spur dialogue and sensitize these issues via trans-disciplinary approaches on disaster risk management.

  8. 49 CFR 571.224 - Standard No. 224; Rear impact protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... trailers, pulpwood trailers, road construction controlled horizontal discharge trailers, special purpose... latches are excluded from the determination of the rearmost point. Road construction controlled horizontal... machine or paving equipment for road construction and paving operations. Rounded corner means a guard's...

  9. Study on Construction Technology of Municipal Road and Bridge Concrete

    NASA Astrophysics Data System (ADS)

    Tang, Fuyong

    2018-03-01

    With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.

  10. Cost, performance, and esthetic impacts of an experimental forest road in Montana

    Treesearch

    Rulon B. Gardner

    1978-01-01

    An experimental logging road designed to minimize environmental and esthetic impact was constructed in northwest Montana. The road was single-lane (14-foot finished surface, 3-foot ditch), constructed along the contour. Esthetically, the single-lane experimental road was judged far superior to existing roads on the forest.

  11. 78 FR 49722 - Tongass National Forest Wrangell Ranger District; Alaska; Wrangell Island Project Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... official will decide whether to authorize timber harvest, associated road construction, and road management... manage roads in the project area to support resource management activities. Proposed Action The Proposed... (NFS) and temporary roads would be constructed and about 7 miles of existing NFS roads would be...

  12. 77 FR 26733 - Uinta-Wasatch-Cache National Forest; Evanston-Mountain View Ranger District; Utah; Smiths Fork...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... mapped, is anticipated to involve approximately 3.1 miles of new specified road construction, approximately 10.7 miles of temporary road construction, approximately 6.7 miles of additional temporary road use on the existing road prism, and approximately 2.6 miles of road reconstruction. Approximately 3.8...

  13. 36 CFR 294.24 - Timber cutting, sale, or removal in Idaho Roadless Areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction of a forest road and subsequent timber cutting. Both the road construction and subsequent timber... the roadless characteristics over the long-term; (ii) Use existing roads or aerial harvest systems... any forest roads or temporary roads, including those authorized under § 294.23(b)(2 and 3) until...

  14. Influence of low impact development construction on pollutant process of road-deposited sediments and associated heavy metals.

    PubMed

    Ma, Yukun; Gong, Manli; Zhao, Hongtao; Li, Xuyong

    2018-02-01

    Intense Low-Impact Development (LID) construction in China could lead to increasingly severe stormwater and receiving water pollution due to the lack of appropriate regulation for mitigating pollution from LID construction. Samples of road-deposited sediments (RDS) were collected from 50 study sites at seven LID construction stages and four road hierarchies to analyze the pollution process and determine the size of the region influenced by LID construction. Six heavy metals were analyzed, and the RDS index model was adopted to estimate the potential heavy metal load washed off by stormwater runoff. Analysis of variance revealed that the excavation and gravel filling of rain gardens and excavation of porous pavements were critical LID construction stages that contributed the largest masses of RDS per unit area to road surfaces. Although the concentration of heavy metals at LID construction sites was lower than at sites without LID construction, the load of heavy metals washed off from LID construction was much higher. In addition, the sizes of regions influenced by accumulated RDS from LID construction descended in the following order: arterial road (600-775m)>collector road (150-200m)>access road (100-150m)>laneway (20-30m). According to the characteristics of LID construction at the study sites, the potential total solid loads in stormwater throughout China were estimated to reach 36,694t by 2020 and 146,777t by 2030. According to the results of analysis, several recommendations are provided for designing LID construction regulations to mitigate stormwater pollution. Copyright © 2017 Elsevier B.V. All rights reserved.

  15. 76 FR 23286 - New Pneumatic Off-the-Road Tires From the People's Republic of China: Final Results of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-26

    ... sites. They can also be used to perform ``rough grading'' in road construction. \\10\\ A straddle carrier... commonly used in maintenance of unpaved roads and road construction to prepare the base course onto which... DEPARTMENT OF COMMERCE International Trade Administration [C-570-913] New Pneumatic Off-the-Road...

  16. 75 FR 34098 - Certain New Pneumatic Off-the-Road Tires from the People's Republic of China: Initiation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ..., etc., typically around construction sites. They can also be used to perform ``rough grading'' in road... grading.'' Graders are commonly used in maintenance of unpaved roads and road construction to prepare the...-the-Road Tires from the People's Republic of China: Initiation of Changed Circumstances Review AGENCY...

  17. Using remote sensing data to predict road fill areas and areas affected by fill erosion with planned forest road construction: a case study in Kastamonu Regional Forest Directorate (Turkey).

    PubMed

    Aricak, Burak

    2015-07-01

    Forest roads are essential for transport in managed forests, yet road construction causes environmental disturbance, both in the surface area the road covers and in erosion and downslope deposition of road fill material. The factors affecting the deposition distance of eroded road fill are the slope gradient and the density of plant cover. Thus, it is important to take these factors into consideration during road planning to minimize their disturbance. The aim of this study was to use remote sensing and field surveying to predict the locations that would be affected by downslope deposition of eroding road fill and to compile the data into a geographic information system (GIS) database. The construction of 99,500 m of forest roads is proposed for the Kastamonu Regional Forest Directorate in Turkey. Using GeoEye satellite images and a digital elevation model (DEM) for the region, the location and extent of downslope deposition of road fill were determined for the roads as planned. It was found that if the proposed roads were constructed by excavators, the fill material would cover 910,621 m(2) and the affected surface area would be 1,302,740 m(2). Application of the method used here can minimize the adverse effects of forest roads.

  18. 48 CFR 436.579 - Opted timber sale road requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Sale Road Requirements, in road construction contracts resulting from a timber sale turnback. ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Opted timber sale road... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 436.579 Opted timber...

  19. Roads and Airfields I (Programed Instruction). Engineer Subcourse 64-9.

    ERIC Educational Resources Information Center

    Army Engineer School, Fort Belvoir, VA.

    The document is a programed text for a correspondence course in the planning, construction, and maintenance of military roads and airfields. There are seven lessons: construction requirements and design criteria; road reconnaissance and site selection; airfield reconnaissance and site selection; layout procedures, construction staking, and field…

  20. Full road closure for work zone operations, a cross-cutting study : reducing congestion and crashes through full road closure for maintenance and construction.

    DOT National Transportation Integrated Search

    2003-08-01

    The objective of this report is to raise awareness among designers construction engineers, and managers of the applications and benefits of full road closure during rehabilitation and construction activities. Based on interviews with project personne...

  1. 36 CFR 294.43 - Prohibition on road construction and reconstruction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or identified recovery watershed, road construction will not diminish, over the long-term, conditions... recovery watershed, road construction will not diminish, over the long-term, conditions in the water... Roadless Area beyond that which was authorized by the terms and conditions of the lease at the time of...

  2. 36 CFR 294.43 - Prohibition on road construction and reconstruction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or identified recovery watershed, road construction will not diminish, over the long-term, conditions... recovery watershed, road construction will not diminish, over the long-term, conditions in the water... Roadless Area beyond that which was authorized by the terms and conditions of the lease at the time of...

  3. [Influence of traffic restriction on road and construction fugitive dust].

    PubMed

    Tian, Gang; Li, Gang; Qin, Jian-Ping; Fan, Shou-Bin; Huang, Yu-Hu; Nie, Lei

    2009-05-15

    By monitoring the road and construction dust fall continuously during the "Good Luck Beijing" sport events, the reduction of road and construction dust fall caused by traffic restriction was studied. The contribution rate of road and construction dust to particulate matter of Beijing atmosphere environment, and the emission ratio of it to total local PM10 emission were analyzed. The results show that the traffic restriction reduces road and construction dust fall significantly. The dust fall average value of ring roads was 0.27 g x (m2 x d)(-1) in the "traffic restriction" period, and the values were 0.81 and 0.59 g x (m2 x d)(-1) 1 month and 7 days before. The dust fall average value of major arterial and minor arterial was 0.21 g x (m2 x d)(-1) in the "traffic restriction" period, and the values were 0.54 and 0.58 g x (m2 x d)(-1) 1 month and 7 days before. The roads emission reduced 60%-70% compared with before traffic restriction. The dust fall average values of civil architecture and utility architecture were 0.61 and 1.06 g x (m2 x d)(-1) in the "traffic restriction" period, and the values were 1.15 and 1.55 g x (m2 x d)(-1) 20 days before. The construction dust reduced 30%-47% compared with 20 days before traffic restriction. Road and construction dust emission are the main source of atmosphere particulate matter in Beijing, and its contribution to ambient PM10 concentration is 21%-36%. PM10 emitted from roads and constructions account for 42%-72% and 30%-51% of local emission while the local PM10 account for 50% and 70% of the total emission.

  4. 17. VIEW OF THE END OF THE PROPOSED CONSTRUCTION ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. VIEW OF THE END OF THE PROPOSED CONSTRUCTION ON THE GENOA PEAK ROAD. AT THIS JUNCTION WITH FOREST SERVICE ROAD 14N32B, THE ROAD WILL BE REALIGNED TO ACCOMMODATE LOGGING TRUCKS ENTERING PROJECT LIMITS. - Genoa Peak Road, Glenbrook, Douglas County, NV

  5. 75 FR 46914 - Certain New Pneumatic Off-the-Road Tires From the People's Republic of China: Final Results of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... sites. They can also be used to perform ``rough grading'' in road construction. \\17\\ A straddle carrier... commonly used in maintenance of unpaved roads and road construction to prepare the base course on to which...-the-Road Tires From the People's Republic of China: Final Results of Changed Circumstances Review...

  6. 75 FR 1403 - Notice of Proposed Information Collection for 1004-0102

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... to pay private landowners for the use and/or maintenance of their roads. These fees represent the BLM's share of road construction and maintenance costs under reciprocal right-of-way agreements between... contract, and to amortize road construction and maintenance costs among several road users. Frequency of...

  7. 75 FR 25195 - Kake to Petersburg Transmission Line Intertie Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... existing roads for construction and long-term maintenance access where possible. New road segments would be.... Both routes would use existing roads for construction and long-term maintenance access where possible...). Both alternative routes follow existing logging roads for the majority of their lengths. In addition...

  8. 25 CFR 170.470 - What are the IRR construction standards?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 170.470 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... this subpart lists design standards that may be used for roads and bridges. (1) Tribes may propose road...

  9. Standard road plans [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  10. Standard road plans : metric [version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed : to show standardized design features, construction methods and approved : materials to be used in design plans for Interstate, Primary, and Secondary : road construction in th...

  11. Geomorphological aspects of road construction in a cold environment, Finland

    NASA Astrophysics Data System (ADS)

    Seppälä, Matti

    1999-12-01

    Traditionally, road alignments followed easy landscapes and suitable landforms. When traffic and the size and weight of vehicles increased and higher speeds were used, straighter roads were required; the easygoing relief could not always be used, and problems arose. Road contractors could save money in building and maintenance costs by considering the geomorphic facts. The examples from Finland document why road construction is very expensive in the conditions generated by severe winters. In Finland, more paved roads cross the Arctic Circle than in the whole of North America. This paper gives examples of geomorphic elements affecting road construction in a cold environment: eskers, drumlins, plains of late and postglacial glaciolacustrine and marine sediments, mires, steep rock cliffs, river channels and ice-dams, fluvial erosion, and palsas. Solutions to these problems include removal of frost sensible materials and replacement by more favorable sediments. Road surfaces, kept snow-free in the wintertime, are subjected to deep freezing. The maintenance of roads can be supported with some solutions that affect snowdrift and icing problems, avoidance of geomorphic factors that cause problems, and by using natural processes to help people. Some examples of how road construction affects geomorphic processes and vice versa are provided. For example, bridges block moving river ice, and on special occasions, road banks cause icing.

  12. 77 FR 58962 - Approval and Promulgation of Implementation Plans; Arizona; Nogales PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... attainment year motor vehicle emissions budget if revised to include road construction PM 10 , because, as... included road construction dust when submitted in its final form, would meet the requirements of CAA... our proposal, we anticipated the necessity for ADEQ to revise the MVEB to include road construction...

  13. Design of Road Pavement Using Recycled Aggregate

    NASA Astrophysics Data System (ADS)

    Remišová, Eva; Decký, Martin; Mikolaš, Milan; Hájek, Matej; Kovalčík, Luboš; Mečár, Martin

    2016-10-01

    The presented article gives special attention to codified clauses of the road construction law, the relevant clauses of the standards and technical regulations to design and control the quality of recycled aggregate constructions. The article also presents the authors’ suggestions to design of earth constructions and pavements of roads according to the Slovak technical standards, technical regulations and objectively determined results of research and development of road infrastructure. The article presents a comparison of the mechanical characteristics measurements of the structural layers of road pavements built from the recycled and natural aggregate. It also presents correlation functions of results obtained from in situ and in laboratory CBR (Californian Bearing Ratio) measuring, representing the world's most widely used control method of bearing capacity of mentioned construction layers.

  14. 75 FR 1800 - Notice of Proposed Information Collection for 1004-0102

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... use and/or maintenance of their roads. These fees represent the BLM's share of road construction and... uses the report to ensure compliance with the timber sale contract, and to amortize road construction... reinstatement of an approval to collect information that documents the payment of road use fees for the use of...

  15. The assessment of environmentally sensitive forest road construction in Calabrian pine forest areas of Turkey.

    PubMed

    Tunay, Metin

    2006-07-01

    Forest road construction by bulldozers in Calabrian Pine (Pinus brutia Ten.) forests on mountainous terrain of Turkey causes considerable damage to the environment and the forest standing alongside the road. This situation obliges a study of environmentally sound road construction in Turkey. This study was carried out in 4 sample sites of Antalya Forest Directorate in steep (34-50% gradient) and very steep terrain (51-70% gradient) conditions with bulldozer and excavator machine and direct damages to forest during road construction was determined, including forest area losses and damages to downhill trees in mountainous areas. It was determined that in steep terrain when excavators were used, less forest area (22.16%) was destroyed compared to bulldozers and 26.54% less area in very steep terrain. The proportion of damage on trees where bulldozer worked was nearly twofold higher than excavator was used. The results of this research show that the environmentally sensitive techniques applied for the road construction projects are considerably superior to the traditional use of bulldozers on steep slopes. The environmentally sound forest road construction by use of excavator must be considered an appropriate and reliable solution for mountainous terrain where areas of sensitive forest ecosystems are to be opened up.

  16. Environmental impacts of forest road construction on mountainous terrain.

    PubMed

    Caliskan, Erhan

    2013-03-15

    Forest roads are the base infrastructure foundation of forestry operations. These roads entail a complex engineering effort because they can cause substantial environmental damage to forests and include a high-cost construction. This study was carried out in four sample sites of Giresun, Trabzon(2) and Artvin Forest Directorate, which is in the Black Sea region of Turkey. The areas have both steep terrain (30-50% gradient) and very steep terrain (51-80% gradient). Bulldozers and hydraulic excavators were determined to be the main machines for forest road construction, causing environmental damage and cross sections in mountainous areas.As a result of this study, the percent damage to forests was determined as follows: on steep terrain, 21% of trees were damaged by excavators and 33% of trees were damaged by bulldozers during forest road construction, and on very steep terrain, 27% of trees were damaged by excavators and 44% of trees were damaged by bulldozers during forest road construction. It was also determined that on steep terrain, when excavators were used, 12.23% less forest area was destroyed compared with when bulldozers were used and 16.13% less area was destroyed by excavators on very steep terrain. In order to reduce the environmental damage on the forest ecosystem, especially in steep terrains, hydraulic excavators should replace bulldozers in forest road construction activities.

  17. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road construction and other projects? 170.405 Section 170.405 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  18. 75 FR 42820 - Notice of Availability of a Final Environmental Assessment (Final EA) and a Finding of No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... include: demolition of approximately 6,435 feet of Airport Road; construction of approximately 6,405 feet of relocated Airport Road; installation of ILS components on the north end of Runway 20; construction of access roads and equipment shelter buildings; construction of the parallel taxiway/ramp expansion...

  19. Standard road plans index sheets [English version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  20. Standard road plans index sheets [metric version].

    DOT National Transportation Integrated Search

    2011-01-01

    The Standard Road Plans contained within this manual have been developed to show standardized design features, construction methods and approved materials to be used in design plans for Interstate, Primary, and Secondary road construction in the Stat...

  1. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  2. Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS)

    NASA Astrophysics Data System (ADS)

    Tay, A. C.; Lee, H. H.

    2018-04-01

    In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brenda R. Pace; Cameron Brizzee; Hollie Gilbert

    The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed tomore » identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.« less

  4. Reliability-based optimization design of geosynthetic reinforced road embankment.

    DOT National Transportation Integrated Search

    2014-07-01

    Road embankments are typically large earth structures, the construction of which requires for large amounts of competent fill soil. In order to limit costs, the utilization of geosynthetics in road embankments allows for construction of steep slopes ...

  5. Faster bridge construction using precast substructures : brief.

    DOT National Transportation Integrated Search

    2011-07-01

    Bridge replacement often requires road closures and detours that frustrate road users. It remains a key goal of Wisconsin DOT to reduce construction-related road use interruptions. This will be a challenge with bridges: Bridge inspections in 2007 ide...

  6. 76 FR 4298 - Certain New Pneumatic Off-the-Road Tires From the People's Republic of China: Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... grading'' in road construction. \\16\\ A straddle carrier is a rigid frame, engine-powered machine that is... road construction to prepare the base course onto which asphalt or other paving material will be laid...-the-Road Tires From the People's Republic of China: Notice of Rescission of Changed Circumstances...

  7. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Revocable road use and construction permits for removal of... road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  8. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  9. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  10. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  11. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  12. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  13. Leaching behaviour of copper slag, construction and demolition waste and crushed rock used in a full-scale road construction.

    PubMed

    Lidelöw, Sofia; Mácsik, Josef; Carabante, Ivan; Kumpiene, Jurate

    2017-12-15

    The leaching behaviour of a road construction with fayalitic copper slag, recycled concrete and crushed rock as sub-base materials was monitored over ten years. All studied materials used in the road construction, including crushed rock, contained concentrations of several elements exceeding the guideline values recommended by the Swedish EPA for total element concentrations for waste materials used in constructions. Despite that, leaching from the road construction under field conditions in general was relatively low. The leachates from the recycled materials contained higher concentrations of several constituents than the leachates from the reference section with crushed rock. The leaching of the elements of interest (Cr, Mo, Ni, Zn) reached peak concentrations during the second and fourth (Cu) years and decreased over the observation period to levels below the Swedish recommended values. Carbonation of the concrete aggregates caused a substantial but short-term increase in the leaching of oxyanions such as chromate. The environmental risks related to element leaching are highest at the beginning of the road life. Ageing of materials or pre-treatment through leaching is needed prior to their use in construction to avoid peak concentrations. Also, the design of road constructions should be adjusted so that recycled materials are covered with low-permeability covers, which would minimize the exposure to atmospheric precipitation and weathering. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Vulnerability Analysis and Evaluation of Urban Road System in Tianjin

    NASA Astrophysics Data System (ADS)

    Liu, Y. Q.; Wu, X.

    In recent years, with the development of economy, the road construction of our country has entered into a period of rapid growth. The road transportation network has been expanding and the risk of disasters is increasing. In this paper we study the vulnerability of urban road system in Tianjin. After analyzed many risk factors of the urban road system security, including road construction, road traffic and the natural environment, we proposed an evaluation index of vulnerability of urban road system and established the corresponding evaluation index system. Based on the results of analysis and comprehensive evaluation, appropriate improvement measures and suggestions which may reduce the vulnerability of the road system and improve the safety and reliability of the road system are proposed.

  15. Construction dust amelioration techniques.

    DOT National Transportation Integrated Search

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  16. Transportation and utilization of aggregates for road construction

    NASA Astrophysics Data System (ADS)

    Fladvad, Marit; Wigum, Børge Johannes; Aurstad, Joralf

    2017-04-01

    Road construction relies on non-renewable aggregate resources as the main construction material. Sources for high-quality aggregate resources are scattered, and requirements for aggregate quality can cause long transport distances between quarry and road construction site. In European countries, the average aggregate consumption per capita is 5 tonnes per year (European Aggregates Association, 2016), while the corresponding figure for Norway is 11 tonnes (Neeb, 2015). Half the Norwegian aggregate production (sand, gravel and crushed rock) is used for road construction. In Norway, aggregate resources have been considered abundant. However, stricter requirement for aggregate quality, and increased concern for sustainability and environmental issues have spurred focus on reduction of transport lengths through better utilization of local aggregate materials. In this research project, information about pavement design and aggregate quality requirements were gathered from a questionnaire sent to selected experts from the World Road Organization (PIARC), European Committee for Standardization (CEN), and Nordic Road Association (NVF). The gathered data was compared to identify differences and similarities for aggregate use in the participating countries. Further, the data was compared to known data from Norway regarding: - amount of aggregates required for a road structure - aggregate transport lengths and related costs A total of 18 countries participated in the survey, represented by either road authorities, research institutions, or contractors. There are large variations in practice for aggregate use among the represented countries, and the selection of countries is sufficient to illustrate a variety in pavement designs, aggregate sizes, and quality requirements for road construction. There are considerable differences in both pavement thickness and aggregate sizes used in the studied countries. Total thicknesses for pavement structures varies from 220 mm to 2400 mm, and aggregate sizes for unbound materials varies from 19 mm to 600 mm. These results imply great differences in the amount of aggregate transport to road construction sites. Another important factor is the distances between the construction sites and the aggregate sources. For many projects, especially in countries in need of importing aggregates, aggregate transport will have considerable impact on sustainability assessment of the construction projects. If pavement design can be altered with the goal of achieving better utilization of local aggregates through adaption to the quality of local aggregates, aggregate transportation can be reduced. Reduced transport will alter the economical balance of a project, allowing reallocation of costs from transport to e.g. improved aggregate production. The overall result can be more profitable construction projects and a more sustainable development of road structures.

  17. Geophysical methods for road construction and maintenance

    NASA Astrophysics Data System (ADS)

    Rasul, Hedi; Karlson, Caroline; Jamali, Imran; Earon, Robert; Olofsson, Bo

    2015-04-01

    Infrastructure, such as road transportation, is a vital in civilized societies; which need to be constructed and maintained regularly. A large part of the project cost is attributed to subsurface conditions, where unsatisfactory conditions could increase either the geotechnical stabilization measures needed or the design cost itself. A way to collect information of the subsurface and existing installations which can lead to measures reducing the project cost and damage is to use geophysical methods during planning, construction and maintenance phases. The moisture in road layers is an important factor, which will affect the bearing capacity of the construction as well as the maintenances. Moisture in the road is a key factor for a well-functioning road. On the other hand the excessive moisture is the main reason of road failure and problems. From a hydrological point of view geophysical methods could help road planners identify the water table, geological strata, pollution arising from the road and the movement of the pollution before, during and after construction. Geophysical methods also allow road planners to collect valuable data for a large area without intrusive investigations such as with boreholes, i.e. minimizing the environmental stresses and costs. However, it is important to specify the investigation site and to choose the most appropriate geophysical method based on the site chosen and the objective of the investigation. Currently, numerous construction and rehabilitation projects are taking places around the world. Many of these projects are focused on infrastructural development, comprising both new projects and expansion of the existing infrastructural network. Geophysical methods can benefit these projects greatly during all phases. During the construction phase Ground Penetrating radar (GPR) is very useful in combination with Electrical Resistivity (ER) for detecting soil water content and base course compaction. However, ER and Electromagnetic (EM) methods can also be used for monitoring changes in water content and pollutant spreading during the maintenance phase. The objective of this study was to describe various geophysical methods which could benefit the road planning, construction and maintenance phases focusing on hydrological impacts.

  18. Construction dust amelioration techniques : [executive summary].

    DOT National Transportation Integrated Search

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  19. Environmental impacts of forest road construction on mountainous terrain

    PubMed Central

    2013-01-01

    Forest roads are the base infrastructure foundation of forestry operations. These roads entail a complex engineering effort because they can cause substantial environmental damage to forests and include a high-cost construction. This study was carried out in four sample sites of Giresun, Trabzon(2) and Artvin Forest Directorate, which is in the Black Sea region of Turkey. The areas have both steep terrain (30-50% gradient) and very steep terrain (51-80% gradient). Bulldozers and hydraulic excavators were determined to be the main machines for forest road construction, causing environmental damage and cross sections in mountainous areas. As a result of this study, the percent damage to forests was determined as follows: on steep terrain, 21% of trees were damaged by excavators and 33% of trees were damaged by bulldozers during forest road construction, and on very steep terrain, 27% of trees were damaged by excavators and 44% of trees were damaged by bulldozers during forest road construction. It was also determined that on steep terrain, when excavators were used, 12.23% less forest area was destroyed compared with when bulldozers were used and 16.13% less area was destroyed by excavators on very steep terrain. In order to reduce the environmental damage on the forest ecosystem, especially in steep terrains, hydraulic excavators should replace bulldozers in forest road construction activities. PMID:23497078

  20. Impacts of disturbance initiated by road construction in a subtropical cloud forest in the Luquillo Experimental Forest, Puerto Rico

    Treesearch

    Lydia P. Olander; F.N Scatena; Whendee L. Silver

    1998-01-01

    The impacts of road construction and the spread of exotic vegetation, which are common threats to upper elevation tropical forests, were evaluated in the subtropical cloud forests of Puerto Rico. The vegetation, soil and microclimate of 6-month-old road®lls, 35-year-old road®lls and mature forest with and without grass understories were compared. Recent road®lls had...

  1. 36 CFR 212.8 - Permission to cross lands and easements owned by the United States and administered by the Forest...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interests of the United States. Permits for such road construction or use will be non-exclusive and will be... States and administered by the Forest Service. (a) Permission to construct or use roads across lands and... benefit is needed by the United States, permission to construct or use a road across lands and across...

  2. Construction of road network vulnerability evaluation index based on general travel cost

    NASA Astrophysics Data System (ADS)

    Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin

    2018-03-01

    With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.

  3. User costs as one of main advantages of precast concrete application in highway construction

    NASA Astrophysics Data System (ADS)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  4. Recycling of waste spent catalyst in road construction and masonry blocks.

    PubMed

    Taha, Ramzi; Al-Kamyani, Zahran; Al-Jabri, Khalifa; Baawain, Mahad; Al-Shamsi, Khalid

    2012-08-30

    Waste spent catalyst is generated in Oman as a result of the cracking process of petroleum oil in the Mina Al-Fahl and Sohar Refineries. The disposal of spent catalyst is of a major concern to oil refineries. Stabilized spent catalyst was evaluated for use in road construction as a whole replacement for crushed aggregates in the sub-base and base layers and as a partial replacement for Portland cement in masonry blocks manufacturing. Stabilization is necessary as the waste spent catalyst exists in a powder form and binders are needed to attain the necessary strength required to qualify its use in road construction. Raw spent catalyst was also blended with other virgin aggregates, as a sand or filler replacement, for use in road construction. Compaction, unconfined compressive strength and leaching tests were performed on the stabilized mixtures. For its use in masonry construction, blocks were tested for unconfined compressive strength at various curing periods. Results indicate that the spent catalyst has a promising potential for use in road construction and masonry blocks without causing any negative environmental impacts. Copyright © 2012 Elsevier B.V. All rights reserved.

  5. Introduction to special issue on hydrologic and geomorphic effects of forest roads

    Treesearch

    Charles H. Luce; Beverley C. Wemple

    2001-01-01

    Roads have been a part of human landscapes for more than 40 centuries. During the 20th century, technological advances have increased our ability to construct new roads at unprecedented rates and into steeper terrain. In the last half of that century, an extensive network of roads has been constructed in forests and other wildlands to facilitate use and management of...

  6. Construction demolition wastes, Waelz slag and MSWI bottom ash: a comparative technical analysis as material for road construction.

    PubMed

    Vegas, I; Ibañez, J A; San José, J T; Urzelai, A

    2008-01-01

    The objective of the study is to analyze the technical suitability of using secondary materials from three waste flows (construction and demolition waste (CDW), Waelz slag and municipal solid waste incineration (MSWI) bottom ash), under the regulations and standards governing the use of materials for road construction. A detailed technical characterization of the materials was carried out according to Spanish General Technical Specifications for Road Construction (PG3). The results show that Waelz slag can be adequate for using in granular structural layers, while CDW fits better as granular material in roadbeds. Likewise, fresh MSWI bottom ash can be used as roadbed material as long as it does not contain a high concentration of soluble salts. This paper also discusses the adequacy of using certain traditional test methods for natural soils when characterizing secondary materials for use as aggregates in road construction.

  7. Assessing changes to in-stream turbidity following construction of a forest road in West Virginia

    Treesearch

    Jingxin Wang; Pamela J. Edwards; William A. Goff

    2011-01-01

    Two forested headwater watersheds were monitored to examine changes to in-stream turbidity following the construction of a forest haul road. One watershed was used as an undisturbed reference, while the other had a 0.92-km (0.57-mi) haul road constructed in it. The channels in both are intermittent tributaries of the Left Fork of Clover Run in the Cheat River watershed...

  8. 37. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. HAND-LAID ROCK BERM ON RETURN CURVE TO PREVENT SCOUR AND SEEPAGE THROUGH FILLS. - Haleakala National Park Roads, Pukalani, Maui County, HI

  9. 75 FR 81210 - Wrangell Ranger District; Alaska; Wrangell Island Project Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... opportunity involving a variety of timber harvest, road construction, and forest restoration and enhancement... authorize forest restoration and enhancement activities, timber harvest, and associated road construction on... Forest Service is proposing a multi-year stewardship project involving a variety of timber harvest, road...

  10. 75 FR 78208 - Black Hills National Forest, Northern Hills Ranger District; South Dakota; Steamboat Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... burning. Approximately 18 miles of new road construction would be necessary to carry out the proposed... may be used. Road construction and maintenance activities would be necessary to access areas proposed for timber harvest. New roads would be closed following management activities. Implementation of...

  11. 39. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H., by Merel S. Sager, Resident Landscape Architect, April 16, 1935. COVERING CONSPICOUS ROCK FILLS WITH SOIL. - Haleakala National Park Roads, Pukalani, Maui County, HI

  12. Traffic Data Collection And Use In The Mexican Interurban Road Network

    DOT National Transportation Integrated Search

    2000-08-01

    This paper describes how in the past, road construction in Mexico was linked more to sociopolitical concerns than to technical or economic studies to justify their construction. Now, new approaches are considered for the planning, construction, maint...

  13. 49 CFR 1.84 - The Federal Highway Administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... environment. (e) Surveying and constructing forest highway system roads, defense highways and access roads... surveillance of accident locations; highway design, construction, and maintenance, including context sensitive...

  14. Use of oil shale ash in road construction: results of follow-up environmental monitoring.

    PubMed

    Reinik, Janek; Irha, Natalya; Koroljova, Arina; Meriste, Tõnis

    2018-01-05

    Oil shale ash (OSA) was used for road construction in a pristine swamp area in East-Estonia during 2013-2014. OSA was used as a binder both in mass stabilization of soft peat soil and in the upper layer. Use of OSA in civil engineering always raises questions about the environmental safety of such activities. Post-construction environmental monitoring of the pilot section was carried out in 2014 and 2015. The monitoring program involved surface water and soil sampling campaigns. Samples were analyzed for selected constituents and parameters of environmental concern. The paper gives data for assessing the environmental impact and evaluation of potential risks associated with construction of roads using OSA. Leaching of hazardous compounds from the pilot section to surrounding aqueous environment was not observed during the monitoring program. Still, the road construction affected the concentration of sulfates in surrounding surface water. Also, the water-soluble content of barium in surface water correlated significantly with the concentrations of chloride and sulfate ion and electric conductivity of the surface water. Therefore, it is recommended to monitor the electric conductivity, concentrations of sulfates, chlorides, and barium in nearby surface water when OSA is used in road construction.

  15. Development and Validity of Western University's On-Road Assessment.

    PubMed

    Classen, Sherrilene; Krasniuk, Sarah; Alvarez, Liliana; Monahan, Miriam; Morrow, Sarah A; Danter, Tim

    2017-01-01

    Although used across North America, many on-road studies do not explicitly document the content and metrics of on-road courses and accompanying assessments. This article discusses the development of the University of Western Ontario's on-road course, and elucidates the validity of its accompanying on-road assessment. We identified main components for developing an on-road course and used measurement theory to establish face, content, and initial construct validity. Five adult volunteer drivers and 30 drivers with multiple sclerosis participated in the study. The road course had face and content validity, representing 100% of roadway components determined through a content validity matrix and index. The known-groups method showed that debilitated drivers (vs. not debilitated), made more driving errors ( W = 463.50, p = .03), and failed the on-road course, indicating preliminary construct validity of the on-road assessment. This research guides and empirically supports a process for developing a road course and its assessment.

  16. Modeling an impact of road geometric design on vehicle energy consumption

    NASA Astrophysics Data System (ADS)

    Luin, Blaž; Petelin, Stojan; Al-Mansour, Fouad

    2017-11-01

    Some roads connect traffic origins and destinations directly, some use winding, indirect routes. Indirect connections result in longer distances driven and increased fuel consumption. A similar effect is observed on congested roads and mountain roads with many changes in altitude. Therefore a framework to assess road networks based on energy consumption is proposed. It has been shown that road geometry has significant impact on overall traffic energy consumption and emissions. The methodology presented in the paper analyzes impact of traffic volume, shares of vehicle classes, road network configuration on the energy used by the vehicles. It can be used to optimize energy consumption with efficient traffic management and to choose optimum new road in the design phase. This is especially important as the energy consumed by the vehicles shortly after construction supersedes the energy spent for the road construction.

  17. 78 FR 57211 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ... rehabilitation design. Taxiway/apron/fuel road pavement replacement. Taxiway/apron/fuel road pavement replacement... Description of Projects Approved for Collection and Use: Taxiway F improvements (design and construction). Drainage ditch improvements (design and construction). Apron C expansion (design and construction...

  18. 36 CFR 223.82 - Contents of advertisement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sale which includes specified road construction with total estimated construction costs of $50,000 or more, the advertisement shall also include: (1) The total estimated construction cost of the permanent roads. (2) A statement extending to small business concerns qualified for preferential bidding on timber...

  19. 76 FR 7807 - Thorne Bay Ranger District; Alaska; Big Thorne Project Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-11

    ... whether or not to authorize timber harvest and associated road construction on Prince of Wales Island in... include the repair of road culverts that do not meet current standards for the passage of fish; recreation... timber sales. Approximately 37 miles of National Forest System and temporary roads would be constructed...

  20. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  1. Research of cost aspects of cement pavements construction

    NASA Astrophysics Data System (ADS)

    Bezuglyi, Artem; Illiash, Sergii; Tymoshchuk, Oleksandr

    2017-09-01

    The tendency to increasing traffic volume on public roads and to increased axle loads of vehicles makes the road scientists to develop scientifically justified methods for preserving the existing and developing the new transport network of Ukraine. One of the options for solving such issues is the construction of roads with rigid (cement concrete) pavement. However, any solution must be justified considering technical and economic components. This paper presents the results of the research of cost aspects of cement pavements construction.

  2. Los Alamos Canyon Ice Rink Parking Flood Plain Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hathcock, Charles Dean; Keller, David Charles

    2015-02-10

    The project location is in Los Alamos Canyon east of the ice rink facility at the intersection of West and Omega roads (Figure 1). Forty eight parking spaces will be constructed on the north and south side of Omega Road, and a lighted walking path will be constructed to the ice rink. Some trees will be removed during this action. A guardrail of approximately 400 feet will be constructed along the north side of West Road to prevent unsafe parking in that area.

  3. New Approach to Road Construction in Oil-Producing Regions of Western Siberia

    NASA Astrophysics Data System (ADS)

    Piirainen, V. Y.; Estrin, Y.

    2017-10-01

    This article presents, as a polemic exercise, a new approach to road construction in marshland areas of oil and gas producing regions of Western Siberia. The approach is based on the use of novel modular elements that can be assembled into an integral structure by means of topological interlocking. The use of modern superlight concrete in conjunction with the new design systems based on the modular principle opens up new avenues to solving problems of road construction in regions with unstable, boggy soils.

  4. Epic Erosion Along Newly Constructed Roads in Yunnan, China

    NASA Astrophysics Data System (ADS)

    Sidle, R. C.; Kono, Y.; Yamaguchi, T.

    2007-05-01

    The recent expansion and construction of new mountain roads in northwestern Yunnan Province, China, poses problems related to landslides and surface erosion that are impacting the headwaters of three great river systems: the Salween, Mekong, and Yangtze. Many of these newer roads are simply blasted into unstable hillsides with virtually no attention paid to optimal road location, construction practices, and erosion control measures. During summer 2006, seven people traveling in a minivan along a newly constructed road to Weixi were killed by a landslide. A survey conducted along a this 23.5 km road section (4 yr old) in the headwaters of the Mekong River revealed epic levels of landslides and surface erosion. Based on a preliminary survey, the road erosion was categorized as moderately severe, severe, or very severe, and a representative 0.75 to 0.90 km stretch of road was then surveyed for both landslide (based on dimensional analysis) and surface erosion (based on soil pedestal height). Average mass wasting rates (9608 t ha-1yr-1) along the road were more than 13 times higher than surface erosion (720 t ha-1yr-1), even though surface erosion rates are among the highest reported for disturbed lands. Dry ravel constituted a minor proportion of the mass wasting: 4% in the severe erosion section of the road and 0.5-0.6% in the moderately severe and very severe sections. For the very severe erosion road section (6 km long), estimated landslide erosion alone was > 33,000 t ha- 1yr-1, 620 times the average landslide erosion from forest roads built in unstable terrain in western North America. These levels of landslide erosion along the Weixi road are the highest ever documented and are somewhat representative of erosion along new mountain roads in this region of Yunnan. Sediment produced from roads is highly connected to fluvial systems; we estimate that 80-95% of the direct sediment contributions into the headwaters of these rivers are attributable to road erosion and landslides. These epic sediment loads represent cumulative effects that may persist in these important transnational rivers for decades.

  5. 75 FR 37350 - Endangered and Threatened Wildlife and Plants; Designation of Critical Habitat for Vermilion Darter

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... with economic activities, including future development, road construction, wastewater treatment, stream... development, road construction, wastewater treatment, stream alteration, and water withdrawal. In order to... activities such as construction and maintenance activities; impoundments (five within the Turkey Creek and...

  6. Road user behaviour changes following a self-explaining roads intervention.

    PubMed

    Mackie, Hamish W; Charlton, Samuel G; Baas, Peter H; Villasenor, Pablo C

    2013-01-01

    The self-explaining roads (SER) approach uses road designs that evoke correct expectations and driving behaviours from road users to create a safe and user-friendly road network. Following the implementation of an SER process and retrofitting of local and collector roads in a suburb within Auckland City, lower speeds on local roads and less variation in speed on both local and collector roads were achieved, along with a closer match between actual and perceived safe speeds. Preliminary analyses of crash data shows that the project has resulted in a 30% reduction crash numbers and an 86% reduction in crash costs per annum, since the road changes were completed. In order to further understand the outcomes from this project, a study was carried out to measure the effects of the SER intervention on the activity and behaviour of all road users. Video was collected over nine separate days, at nine different locations, both before and after SER construction. Road user behaviour categories were developed for all potential road users at different location types and then used to code the video data. Following SER construction, on local roads there was a relatively higher proportion of pedestrians, less uniformity in vehicle lane keeping and less indicating by motorists along with less through traffic, reflecting a more informal/low speed local road environment. Pedestrians were less constrained on local roads following SER construction, possibly reflecting a perceptually safer and more user-friendly environment. These behaviours were not generally evident on collector roads, a trend also shown by the previous study of speed changes. Given that one of the objectives of SER is to match road user behaviour with functionally different road categories, the road user behaviour differences demonstrated on different road types within the SER trial area provides further reinforcement of a successful SER trial. Copyright © 2012 Elsevier Ltd. All rights reserved.

  7. Logistics Solution for Choosing Location of Production of Road Construction Enterprise

    NASA Astrophysics Data System (ADS)

    Gavrilina, I.; Bondar, A.

    2017-11-01

    The current state of construction of highways indicates that not all the resources of the construction organization are implemented and supported by the modern approaches in logistics problems solving. This article deals with the solution of these problems and considers the features of basic road linear works organization, their large extent and different locations of enterprises. Analyzing these data, it is proposed to simulate the logistics processes and substantiate the methods of transport operations organizing by linking the technology and the organization road construction materials delivery which allows one to optimize the construction processes, to choose the most economically advantageous options, and also to monitor the quality of work.

  8. 25 CFR 170.473 - What happens when a construction project ends?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...

  9. 50 CFR 216.200 - Specified activity and specified geographical region.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under §§ 216.106 and 216.208 include, but may not be limited to, site construction, including ice road... ice road construction, and vessel and helicopter activity, but excluding seismic operations. (a)(1... TAKING AND IMPORTING OF MARINE MAMMALS Taking of Marine Mammals Incidental to Construction and Operation...

  10. A road pavement full-scale test track containing stabilized bottom ashes.

    PubMed

    Toraldo, E; Saponaro, S

    2015-01-01

    This paper reports the results of a road pavement full-scale test track built by using stabilized bottom ash (SBA) from an Italian municipal solid waste incinerator as the aggregate in granular foundation, cement-bound mixes and asphalt concretes. The investigation focused on both the performance and the environmental compatibility of such mixes, especially with regard to the effects of mixing, laying and compaction. From the road construction point of view, the performance related to the effects of mixing, laying and compaction on constructability was assessed, as well as the volumetric and the mechanical properties. Environmental aspects were investigated by leaching tests. The results suggested that SBA meets the environmental Italian law for the reuse of non-hazardous waste and could be used as road material with the procedures, plants and equipment currently used for road construction.

  11. 34. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, H.L. Handley, Assistant Highway Engineer, March 30, 1935. NOTE HOW THE LOCATION FITS THE CONTOUR OF THE HILL. LOOKING FROM STATION 382+00 ON HALEAKALA HIGHWAY. - Haleakala National Park Roads, Pukalani, Maui County, HI

  12. 77 FR 10717 - Black Hills National Forest, Custer, South Dakota-Mountain Pine Beetle Response Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... trees to prevent infestation. Some temporary road construction is proposed, although generally road access would use existing road templates where available. Roads would be closed after use. Possible...

  13. Bio fuel ash in a road construction: impact on soil solution chemistry.

    PubMed

    Thurdin, R T; van Hees, P A W; Bylund, D; Lundström, U S

    2006-01-01

    Limited natural resources and landfill space, as well as increasing amounts of ash produced from incineration of bio fuel and municipal solid waste, have created a demand for useful applications of ash, of which road construction is one application. Along national road 90, situated about 20 km west of Sollefteå in the middle of Sweden, an experiment road was constructed with a 40 cm bio fuel ash layer. The environmental impact of the ash layer was evaluated from soil solutions obtained by centrifugation of soil samples taken on four occasions during 2001-2003. Soil samples were taken in the ash layer, below the ash layer at two depths in the road and in the ditch. In the soil solutions, pH, conductivity, dissolved organic carbon (DOC) and the total concentration of cations (metals) and anions were determined. Two years after the application of the ash layers in the test road, the concentrations in the ash layer of K, SO4, Zn, and Hg had increased significantly while the concentration of Se, Mo and Cd had decreased significantly. Below the ash layer in the road an initial increase of pH was observed and the concentrations of K, SO4, Se, Mo and Cd increased significantly, while the concentrations of Cu and Hg decreased significantly in the road and also in the ditch. Cd was the element showing a potential risk of contamination of the groundwater. The concentrations of Ca in the ash layer indicated an ongoing hardening, which is important for the leaching rate and the strength of the road construction.

  14. 48 CFR 452.236-79 - Opted Timber Sale Road Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Opted Timber Sale Road... Opted Timber Sale Road Requirements. As prescribed in 436.579, insert the following clause: Opted Timber Sale Road Requirements (NOV 1996) This contract is for the construction of timber sale road(s) which a...

  15. A tool to analyze environmental impacts of roads on forest watersheds

    Treesearch

    Ajay Prasad

    2007-01-01

    The construction and use of forest roads can have impacts on geomorphic processes and erosion patterns in forested basins. Analyzing these impacts will help forest managers to effectively manage road and road drainage system and hence minimize the negative impacts of forest roads. To manage forest roads effectively the USDA Forest Service (USFS) has developed a road...

  16. 25 CFR 170.472 - What construction records must tribes and BIA keep?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What construction records must tribes and BIA keep? 170.472 Section 170.472 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  17. 76 FR 77301 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ...: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... Road on Midvale Boulevard to Summit Road. Stage 1 is currently scheduled for construction from... for construction from approximately 2017 to 2018. Stage 3 will be constructed when operations and...

  18. Cost of and soil loss on "minimum-standard" forest truck roads constructed in the central Appalachians

    Treesearch

    J. N. Kochenderfer; G. W. Wendel; H. Clay Smith

    1984-01-01

    A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...

  19. 36 CFR 251.114 - Criteria, terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required to construct new roads or reconstruct existing roads to bring the roads to a safe and adequate standard. A landowner also may be required to provide for the operation and maintenance of the road. This may be done by arranging for such road to be made part of the local public road system, or formation...

  20. 36 CFR 212.9 - Principles for sharing use of roads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... minor amounts, will be conditioned upon improvement or supplemental construction of the road to safety... roads. 212.9 Section 212.9 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE... of roads. The use of roads under arrangements for sharing costs or performance shall be in accordance...

  1. Analysis of loss of time value during road maintenance project

    NASA Astrophysics Data System (ADS)

    Sudarsana, Dewa Ketut; Sanjaya, Putu Ari

    2017-06-01

    Lane closure is frequently performed in the execution of the road maintenance project. It has a negative impact on road users such as the loss of vehicle operating costs and the loss of time value. Nevertheless, analysis on loss of time value in Indonesia has not been carried out. The parameter of time value for the road users was the minimum wage city/region approach. Vehicle speed of pre-construction was obtained by observation, while the speed during the road maintenance project was predicted by the speed of the pre-construction by multiplying it with the speed adjustment factor. In the case of execution of the National road maintenance project in the two-lane two-way urban and interurban road types in the fiscal year of 2015 in Bali province, the loss of time value was at the average of IDR 12,789,000/day/link road. The relationship of traffic volume and loss of time value of the road users was obtained by a logarithm model.

  2. Subdivision Roads : Minimum Construction Standards

    DOT National Transportation Integrated Search

    2000-01-01

    Any person or corporation desiring to construct a new subdivision road which is to be dedicated as public, must submit the following information to the District Engineer for proper evaluation in order to obtain a certificate of approval as required b...

  3. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

    DOT National Transportation Integrated Search

    1996-01-01

    These standard specifications were issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-96" indicating Standard Sp...

  4. Quantification of Gravel Rural Road Sediment Production

    NASA Astrophysics Data System (ADS)

    Silliman, B. A.; Myers Toman, E.

    2014-12-01

    Unbound rural roads are thought to be one of the largest anthropogenic sources of sediment reaching stream channels in small watersheds. This sediment deposition can reduce water quality in the streams negatively impacting aquatic habitat as well as impacting municipal drinking water sources. These roads are thought to see an increase in construction and use in southeast Ohio due to the expansion of shale gas development in the region. This study set out to quantify the amount of sediment these rural roads are able to produce. A controlled rain event of 12.7 millimeters of rain over a half hour period was used to drive sediment production over a 0.03 kilometer section of gravel rural road. These 8 segments varied in many characteristics and produced from 2.0 to 8.4 kilograms of sediment per 0.03 kilometers of road with the average production over the 8 segments being 5.5 kilograms of sediment. Sediment production was not strongly correlated with road segment slope but traffic was found to increase sediment production from 1.1 to 3.9 times as much sediment after traffic use. These results will help inform watershed scale sediment budgeting, and inform best management practices for road maintenance and construction. This study also adds to the understanding of the impacts of rural road use and construction associated with the changing land use from agricultural to natural gas extraction.

  5. Knowledge Construction in a Teachers' Community of Enquiry: A Possible Road Map

    ERIC Educational Resources Information Center

    Zellermayer, Michal; Tabak, Edith

    2006-01-01

    This action research is targeted at academic researchers who facilitate the construction of communities of enquiry in school-university partnerships and are interested in understanding the process of such an enterprise as well as the knowledge constructed within such communities. Our action research study provides a possible road map for such a…

  6. Water, frost, and frost resistance of natural and artificial building stones

    USGS Publications Warehouse

    Breyer, H.; Britt, S. H.

    1953-01-01

    The worst enemy of construction engineering and of construction material is uncontrollable water, whether it be ground-, seepage-, rainwater, water of condensation, or melting snow and ice, exerting objectionable pressure upon tracks and roads. this applies as well to structures above the ground as to bridge piers and foundations, road construction, earthwork, etc. 

  7. Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province

    NASA Astrophysics Data System (ADS)

    Rani, Hafnidar A.

    2016-11-01

    The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.

  8. 36 CFR 212.5 - Road system management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction, reconstruction, decommissioning, and maintenance. (2) Identification of unneeded roads... share of the costs. (d) Maintenance and reconstruction of National Forest System roads by users—(1... to cover maintenance or reconstruction of roads shall be used for the purposes deposited, except that...

  9. Complex solution of problem of all-season construction of roads and pipelines on universal composite pontoon units

    NASA Astrophysics Data System (ADS)

    Ryabkov, A. V.; Stafeeva, N. A.; Ivanov, V. A.; Zakuraev, A. F.

    2018-05-01

    A complex construction consisting of a universal floating pontoon road for laying pipelines in automatic mode on its body all year round and in any weather for Siberia and the Far North has been designed. A new method is proposed for the construction of pipelines on pontoon modules, which are made of composite materials. Pontoons made of composite materials for bedding pipelines with track-forming guides for automated wheeled transport, pipelayer, are designed. The proposed system eliminates the construction of a road along the route, ensures the buoyancy and smoothness of the self-propelled automated stacker in the form of a "centipede", which has a number of significant advantages in the construction and operation of the entire complex in the swamp and watered areas without overburden.

  10. Valorization of unauthorized sea disposal dredged sediments as a road foundation material.

    PubMed

    Achour, Raouf; Abriak, Nor-Edine; Zentar, Rachid; Rivard, Patrice; Gregoire, Pascal

    2014-08-01

    The main objective of this study is to show the ability of fine dredged material (mainly silty material) to be used in road construction project. This paper is divided into three parts. In the first part, the physical, the mineralogical and the mechanical characteristics of the used fine dredged sediments, as well as their chemical composition and environmental impacts are presented. In the second part, the methodology developed to design the road made from dredged fine sediment is developed. The third part of the paper focuses on the presentation of the road construction and the interpretation of analyses made on cores drilled samples from the road and measurements of the deflection of the road. The environmental assessment, based on leaching tests, is also performed at different issues.

  11. 14 CFR Appendix G to Part 151 - Appendix G to Part 151

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... itemization of typical eligible and ineligible items of road construction covered by § 151.89 of this chapter: Typical Eligible Items 1. Entrance roads. 2. Service roads for access to public areas. 3. Service roads for airport maintenance (including perimeter airport service road within airport boundary and not for...

  12. Recommendations for Constructing Roadside Vegetation Barriers to Improve Near-Road Air Quality

    EPA Pesticide Factsheets

    The EPA report, Recommendations for Constructing Roadside Vegetation Barriers to Improve Near-Road Air Quality, summarizes the research findings on the best practices for building roadside vegetative barriers to improve air quality. This fact sheet describ

  13. 77 FR 2083 - Notice of Inventory Completion: Minnesota Indian Affairs Council, Bemidji, MN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... the north side of Height of Land Lake, site 21BK48, by Mr. William Krause during road construction and... near Ice Cracking Lake during road construction and donated to the Becker County Historical Society (HR...

  14. Safety impacts of rural road construction

    DOT National Transportation Integrated Search

    2001-02-01

    Crash data in Kentucky show that the fatal crash rate on two-lane rural roads is substantially higher than on any other type of road. Improvements have been proposed at some locations on this type of road which involve either upgrading the existing t...

  15. Soil density and moisture content on two unused forest roads during first 30 months after construction

    Treesearch

    J.D. Helvey; J.N. Kochenderfer; J.N. Kochenderfer

    1990-01-01

    Reports results of soil density and soil moisture measurements on two roads in the central Appalachians over a 30-month period. Density increased slightly during the measurement period at most locations. Almost all of the density changes occurred during the first few months after construction. Moisture content decreased during the first few months after construction,...

  16. 2. HISTORIC PHOTOGRAPH, MERRITT PARKWAY UNDER CONSTRUCTION,LOOKING WEST TO ROUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. HISTORIC PHOTOGRAPH, MERRITT PARKWAY UNDER CONSTRUCTION,LOOKING WEST TO ROUND HILL ROAD BRIDGE, CA. 1936. COLLECTION OF GEORGE L. LARNED. - Merritt Parkway, Round Hill Road Bridge, Spanning Merritt Parkway at 3.5 mile mark, Greenwich, Fairfield County, CT

  17. 49 CFR 1.84 - The Federal Highway Administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... environment. (e) Surveying and constructing forest highway system roads, defense highways and access roads... surveillance of accident locations; highway design, construction, and maintenance, including context sensitive...-to-infrastructure research. (i) Managing TIFIA funds, 23 U.S.C. 601-609, in conjunction with the...

  18. 49 CFR 1.84 - The Federal Highway Administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... environment. (e) Surveying and constructing forest highway system roads, defense highways and access roads... surveillance of accident locations; highway design, construction, and maintenance, including context sensitive...-to-infrastructure research. (i) Managing TIFIA funds, 23 U.S.C. 601-609, in conjunction with the...

  19. Feasibility of Using Unbound Mixed Recycled Aggregates from CDW over Expansive Clay Subgrade in Unpaved Rural Roads

    PubMed Central

    Del Rey, Isaac; Ayuso, Jesús; Galvín, Adela P.; Jiménez, José R.; Barbudo, Auxi

    2016-01-01

    Social awareness aims to increase practical skills, such as sustainable development, which seeks to increase the use of different types of waste in construction activities. Although insufficient attention is sometimes given to these actions, it is essential to spread information regarding new studies in the field of waste recycling, which encourages and promotes waste use. Reusing and recycling construction waste in the creation of buildings and infrastructure are fundamental strategies to achieving sustainability in the construction and engineering sectors. In this context, the concept of waste would no longer exist, as waste would become a material resource. Therefore, this study analyses the behaviours of two unbound mixed recycled aggregates (MRA) in the structural layers of an unpaved rural road with low traffic (category T43). The sections were built on inappropriate soil (A-7-6) with a high degree of free swelling. The experimental road consisted of three sections: the first was made with natural aggregates (NA) that were used as a control, the second was composed of MRA in the subbase and NA in the base, and the third section was completely composed of MRA. The materials were characterised in the laboratory. The behaviours of the structural layers in the experimental road were determined by controlling compaction (“in situ” density and moisture) and measuring the deflections and load capacity (deflectometer) during the 18 months after construction. The results show that the sections made with recycled aggregates meet the technical specifications required by General Technical Specifications for Road and Bridge Works (PG-3). Therefore, the water-soluble sulphate content and Los Angeles abrasion coefficient limits can be increased for recycled aggregates without compromising the quality of this type of road with low traffic. To the best of our knowledge, this is the first study regarding the use of unbound MRA made from construction and demolition waste (CDW) in the construction of an unpaved rural road with low traffic on an expansive clay subgrade. PMID:28774053

  20. Iowa drainage law manual.

    DOT National Transportation Integrated Search

    2005-04-01

    The relationship between Iowas roads and : drainage developed when rural roads were originally : constructed. The land parallel to roadways was : excavated to create road embankments. The resulting : ditches provided an outlet for shallow tiles to...

  1. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  2. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  3. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  4. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and... having maintenance responsibility. (3) A change that exceeds the limits of available funding may be made...

  5. Leaching behavior of coal combustion products and the environmental implication in road construction.

    DOT National Transportation Integrated Search

    2011-04-01

    Leaching of trace elements may raise environmental concerns when using coal fly ash in road construction. US EPA is in the process : of creating the first national rule on coal ash management, including beneficial use. Meanwhile, driven by the tighte...

  6. 25 CFR 170.500 - What program reviews do the Secretaries conduct?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Section 170.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7...

  7. 25 CFR 170.415 - What is pre-project planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range... sources and identification of other funding sources to expedite the planning, design, and construction of...

  8. Construction activity, emissions, and air quality impacts : real-world observations from an Arizona road-widening case study.

    DOT National Transportation Integrated Search

    2010-10-22

    The Arizona Department of Transportation (ADOT) sponsored this investigation, a field : study of emissions and air quality impacts generated from a road widening project, to gain : insight into construction-related emissions of particulate matter (PM...

  9. SIMPAVE : towards building interactive simulations for planning pavement construction

    DOT National Transportation Integrated Search

    2007-04-01

    The goal of this project is to produce a software simulation that enables a user to manage a road construction project from the hot mix asphalt plant operation to the finished paved road. Throughout the simulation, the user is provided with the resou...

  10. Developing improved opportunities for the recycling and reuse of materials in road, bridge, and construction projects.

    DOT National Transportation Integrated Search

    2014-12-01

    The use of recycled and reused materials in transportation construction reduces consumption of non-renewable : resources. The objective of this research was to develop opportunities for improving the recycling and reuse of : materials in road and bri...

  11. 36 CFR 223.37 - Revegetation of temporary roads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... roads. 223.37 Section 223.37 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... Provisions § 223.37 Revegetation of temporary roads. Timber sale contracts, permits and other documents... roads constructed or used thereunder so as to permit the reestablishment by artificial or natural means...

  12. Do Bat Gantries and Underpasses Help Bats Cross Roads Safely?

    PubMed Central

    Berthinussen, Anna; Altringham, John

    2012-01-01

    Major roads can reduce bat abundance and diversity over considerable distances. To mitigate against these effects and comply with environmental law, many European countries install bridges, gantries or underpasses to make roads permeable and safer to cross. However, through lack of appropriate monitoring, there is little evidence to support their effectiveness. Three underpasses and four bat gantries were investigated in northern England. Echolocation call recordings and observations were used to determine the number of bats using underpasses in preference to crossing the road above, and the height at which bats crossed. At gantries, proximity to the gantry and height of crossing bats were measured. Data were compared to those from adjacent, severed commuting routes that had no crossing structure. At one underpass 96% of bats flew through it in preference to crossing the road. This underpass was located on a pre-construction commuting route that allowed bats to pass without changing flight height or direction. At two underpasses attempts to divert bats from their original commuting routes were unsuccessful and bats crossed the road at the height of passing vehicles. Underpasses have the potential to allow bats to cross roads safely if built on pre-construction commuting routes. Bat gantries were ineffective and used by a very small proportion of bats, even up to nine years after construction. Most bats near gantries crossed roads along severed, pre-construction commuting routes at heights that put them in the path of vehicles. Crossing height was strongly correlated with verge height, suggesting that elevated verges may have some value in mitigation, but increased flight height may be at the cost of reduced permeability. Green bridges should be explored as an alternative form of mitigation. Robust monitoring is essential to assess objectively the case for mitigation and to ensure effective mitigation. PMID:22719941

  13. A framework of analysis for field experiments with alternative materials in road construction.

    PubMed

    François, D; Jullien, A

    2009-01-01

    In France, a wide variety of alternative materials is produced or exists in the form of stockpiles built up over time. Such materials are distributed over various regions of the territory depending on local industrial development and urbanisation trends. The use of alternative materials at a national scale implies sharing local knowledge and experience. Building a national database on alternative materials for road construction is useful in gathering and sharing information. An analysis of feedback from onsite experiences (back analysis) is essential to improve knowledge on alternative material use in road construction. Back analysis of field studies has to be conducted in accordance with a single common framework. This could enable drawing comparisons between alternative materials and between road applications. A framework for the identification and classification of data used in back analyses is proposed. Since the road structure is an open system, this framework has been based on a stress-response approach at both the material and structural levels and includes a description of external factors applying during the road service life. The proposal has been shaped from a review of the essential characteristics of road materials and structures, as well as from the state of knowledge specific to alternative material characterisation.

  14. The potential of bioash for utilization in road construction in eastern Croatia

    NASA Astrophysics Data System (ADS)

    Zagvozda, Martina; Dimter, Sanja; Rukavina, Tatjana

    2017-12-01

    In recent years usage of biomass as energy source has intensified in eastern Croatia. Newly built biomass power plants generate great amounts of bioash that is being disposed at landfills. Due to its favorable properties bioashes could be reused as alternative materials in road construction or road fundation. Therefore, research on application of bioashes in construction industry is being conducted at Faculty of Civil Engineering in Osijek. The main motivation behind this research, in a form of biomass and bioash production in eastern Croatia as well as international research on potential application of this types of bioashes, is show in this paper.

  15. 78 FR 13618 - Shasta-Trinity National Forest; California; Elk Late-Successional Reserve Enhancement Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... reduction would be completed using mechanical and hand methods and prescribed fire. Proposed road actions include maintenance and reconstruction of National Forest System roads, construction of temporary roads to complete project activities, and closure and decommissioning of National Forest System roads and existing...

  16. Optimization of a pavement instrumentation plan for a full-scale test road : evaluation, [summary].

    DOT National Transportation Integrated Search

    2014-04-01

    The Florida Department of Transportation (FDOT) : has begun planning for a concrete test road : that will run parallel to US-301 for 2.5 miles in : Bradford County. Test road construction begins in : 2016. The roads 52 segments will enable real-wo...

  17. 36 CFR 1004.21 - Speed limits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of a vehicle on a Presidio Trust road. Signs indicating that vehicle speed is determined by the use... sections of Presidio Trust road under repair or construction. (3) 45 miles per hour: upon all other Presidio Trust roads. (b) The Board may designate a different speed limit upon any Presidio Trust road when...

  18. 36 CFR 1004.21 - Speed limits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of a vehicle on a Presidio Trust road. Signs indicating that vehicle speed is determined by the use... sections of Presidio Trust road under repair or construction. (3) 45 miles per hour: upon all other Presidio Trust roads. (b) The Board may designate a different speed limit upon any Presidio Trust road when...

  19. 36 CFR 1004.21 - Speed limits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of a vehicle on a Presidio Trust road. Signs indicating that vehicle speed is determined by the use... sections of Presidio Trust road under repair or construction. (3) 45 miles per hour: upon all other Presidio Trust roads. (b) The Board may designate a different speed limit upon any Presidio Trust road when...

  20. 36 CFR 1004.21 - Speed limits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of a vehicle on a Presidio Trust road. Signs indicating that vehicle speed is determined by the use... sections of Presidio Trust road under repair or construction. (3) 45 miles per hour: upon all other Presidio Trust roads. (b) The Board may designate a different speed limit upon any Presidio Trust road when...

  1. 14 CFR 151.89 - Roads.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Appendix G sets forth typical eligible and ineligible items of road construction covered by this section. ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Roads. 151.89 Section 151.89 Aeronautics... AID TO AIRPORTS Project Programming Standards § 151.89 Roads. (a) Federal-aid Airport Program funds...

  2. 77 FR 43046 - Lolo National Forest; Montana; Center Horse Landscape Restoration EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... construction (about 5 miles); (7) re-route 5 road segments to improve fish habitat; (8) add existing roads to... implement restoration activities, including vegetation management, road and trail management, and watershed... unneeded or environmentally impactive roads and trails. Proposed Action The Center Horse Landscape...

  3. Evaluation of graded limestone base course on a low volume road : final report.

    DOT National Transportation Integrated Search

    1985-04-01

    Due to decreasing supplies of native aggregate which may be incorporated into a base course, other materials need to be evaluated for constructibility and performance. To this end, a graded limestone base was constructed on a low volume road and eval...

  4. 25 CFR 170.471 - How are projects administered?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are projects administered? 170.471 Section 170.471 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Construction and...

  5. Calibration and implementation of miniature electronic cone penetrometers for road and highway design and construction control : final report.

    DOT National Transportation Integrated Search

    1997-12-01

    A prototype miniature electronic cone penetrometer system is developed for road and highway design and construction control. The equipment is implemented in front of the Research Vehicle for Geotechnical In Situ testing and Support (REVEGITS). A cali...

  6. 75 FR 31463 - Comal County Regional Habitat Conservation Plan, Comal County, TX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ... as school development, road construction and maintenance, and parkland. The ITP will cover Comal... activities including, but not limited to: Public or private construction and development, utility... Wildlife Service, 10711 Burnet Road, Suite 200, Austin, TX 78758 or 512-490-0057. SUPPLEMENTARY INFORMATION...

  7. Low-volume road engineering : Best Management Practices : Field Guide

    DOT National Transportation Integrated Search

    2003-07-01

    Improperly constructed roads can negatively impact everything from terrestrial plant populations and soil conservation efforts to water quality and populations of aquatic organisms in receiving waters. This Low-Volume Roads Engineering Best Managemen...

  8. Automated Road Closure Gate

    DOT National Transportation Integrated Search

    2000-05-01

    This report presents the procedures involved in the research, design, construction, and testing of an Automated Road Closure Gate. The current road closure gates used in South Dakota are often unsafe and difficult to operate. This report will assist ...

  9. 1. View looking northwest, from Middle Mount Vernon Road, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. View looking northwest, from Middle Mount Vernon Road, showing the slight rise upon which the building was constructed. - Perry Township School No. 3, Middle Mount Vernon & Eickhoff Roads, Evansville, Vanderburgh County, IN

  10. Monitoring sediment production from forest road approaches to stream crossing in the Virginia Piedmont

    Treesearch

    Kristopher R. Brown; W. Michael Aust; Kevin J. McGuire

    2015-01-01

    Reopening of abandoned legacy roads is common in forest operations and represents a reduced cost in comparison to new road construction. However, legacy roads may have lower road standards and require additional best management practice (BMP) implementation upon reopening to protect water quality. Silt fences and elevation measurements of trapped sediment were used to...

  11. Application of liquid-based cytology preparation in micronucleus assay of exfoliated buccal epithelial cells in road construction workers.

    PubMed

    Arul, P

    2017-01-01

    Asphalts are bitumens that consist of complex of hydrocarbon mixtures and it is used mainly in road construction and maintenance. This study was undertaken to evaluate the micronucleus (MN) assay of exfoliated buccal epithelial cells in road construction workers using liquid-based cytology (LBC) preparation. Three different stains (May-Grunwald Giemsa, hematoxylin and eosin, and Papanicolaou) were used to evaluate the frequency of MN in exfoliated buccal epithelial of 100 participants (fifty road construction workers and fifty administrative staff) using LBC preparation. Statistical analysis was performed with Student's t-test, and P< 0.05 was considered statistically significant. The mean frequency of MN for cases was significantly higher than that of controls (P = 0.001) regardless of staining method used and also cases with exposure period of more than 5 years had statistically significant difference (P < 0.05) than cases with Conclusion: The present study concluded that workers exposed to asphalts during road construction exhibit a higher frequency of MN in exfoliated buccal epithelial cells and they are under the significant risk of cytogenetic damage. LBC preparation has potential application for the evaluation of frequency of MN. This technique may be advocated in those who are occupationally exposed to potentially carcinogenic agents in view of improvement in the smear quality and visualization of cell morphology.

  12. 36 CFR 223.62 - Timber purchaser road construction credit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  13. 36 CFR 223.62 - Timber purchaser road construction credit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  14. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  15. 36 CFR 223.62 - Timber purchaser road construction credit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  16. 36 CFR 223.62 - Timber purchaser road construction credit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Timber purchaser road construction credit. 223.62 Section 223.62 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  17. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL...

  18. 77 FR 14727 - Tongass National Forest Wrangell Ranger District; Alaska; Wrangell Island Project Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... of timber harvest, road construction and reconstruction, and silvicultural practices used; (2) access... Action The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, and forest restoration and enhancement activities. The proposed action would include the harvest...

  19. 23. Surrender interview site, showing Pemberton Avenue concrete slab road ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Surrender interview site, showing Pemberton Avenue concrete slab road type with gutter (asphalt construction typical on Union and Confederate Avenues), view to the sw. - Vicksburg National Military Park Roads & Bridges, Vicksburg, Warren County, MS

  20. Evaluation of aggregate sections at Mn/ROAD

    DOT National Transportation Integrated Search

    2000-06-01

    This project focuses on the second construction phase of the Minnesota Road Research facility (Mn/ROAD) and evaluates three typical, locally available, surfacing aggregates along with a rollover section from the initial phase for performance. The pro...

  1. Geospatial wetlands impacts and mitigation forecasting models.

    DOT National Transportation Integrated Search

    2017-06-30

    The South Carolina Department of Transportation (SCDOT) develops near (3-5 years) and long (15- 20 years) range plans for road widening, alignment, bridge replacement, and new road construction. Each road/bridge project may impact wetlands or streams...

  2. 25 CFR Appendix B to Subpart D - Design Standards for the IRR Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Pt. 170... Local Roads (ADT less than or equal to 400). 7. FHWA Federal Lands Highway, Project Development and Design Manual. 8. FHWA Flexibility in Highway Design. 9. FHWA Roadside Improvements for Local Road and...

  3. A conceptual framework for assessing impacts of roads on aquatic biota

    Treesearch

    Paul L. Angermeier; Andrew P. Wheeler; Amanda E. Rosenberger

    2004-01-01

    Roads are pervasive in modern landscapes and adversely affect many aquatic ecosystems. Conventional environmental assessments of roads focus on construction impacts but ignore subsequent impacts. A comprehensive framework for considering all impacts of roads would enable scientists and managers to develop assessment tools that more accurately inform stakeholders and...

  4. 36 CFR 4.21 - Speed limits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... park road. Signs indicating that vehicle speed is determined by the use of radiomicrowaves or other... of park road under repair or construction. (3) 45 miles per hour: upon all other park roads. (b) The superintendent may designate a different speed limit upon any park road when a speed limit set forth in paragraph...

  5. 36 CFR 4.21 - Speed limits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... park road. Signs indicating that vehicle speed is determined by the use of radiomicrowaves or other... of park road under repair or construction. (3) 45 miles per hour: upon all other park roads. (b) The superintendent may designate a different speed limit upon any park road when a speed limit set forth in paragraph...

  6. 36 CFR 4.21 - Speed limits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... park road. Signs indicating that vehicle speed is determined by the use of radiomicrowaves or other... of park road under repair or construction. (3) 45 miles per hour: upon all other park roads. (b) The superintendent may designate a different speed limit upon any park road when a speed limit set forth in paragraph...

  7. 36 CFR 4.21 - Speed limits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... park road. Signs indicating that vehicle speed is determined by the use of radiomicrowaves or other... of park road under repair or construction. (3) 45 miles per hour: upon all other park roads. (b) The superintendent may designate a different speed limit upon any park road when a speed limit set forth in paragraph...

  8. 36 CFR 4.21 - Speed limits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... park road. Signs indicating that vehicle speed is determined by the use of radiomicrowaves or other... of park road under repair or construction. (3) 45 miles per hour: upon all other park roads. (b) The superintendent may designate a different speed limit upon any park road when a speed limit set forth in paragraph...

  9. 76 FR 78234 - Medicine Bow-Routt National Forests and Thunder Basin National Grassland, Campbell County, WY...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... the road construction, the final easement would be acquired by Campbell County, and this road will be... National Grassland, Campbell County, WY; Mackey Road Relocation AGENCY: Forest Service, USDA. ACTION... authorize Peabody Powder River Mining, LLC to vacate and relocate portions of Campbell County Road 69...

  10. 78 FR 55055 - Beaverhead-Deerlodge National Forest, Montana; Supplemental Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... determination will be made based upon the analysis of the effects of temporary road construction and use. The... Management Plan To Comply With a District of Montana Court Order (Temporary Roads) AGENCY: Forest Service... support, if possible, its decision to exclude temporary roads from the road density objectives...

  11. 25 CFR Appendix B to Subpart D - Design Standards for the IRR Program

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Pt. 170... Local Roads (ADT less than or equal to 400). 7. FHWA Federal Lands Highway, Project Development and Design Manual. 8. FHWA Flexibility in Highway Design. 9. FHWA Roadside Improvements for Local Road and...

  12. 30 CFR 780.37 - Road systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Road systems. 780.37 Section 780.37 Mineral... MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.37 Road systems... plans and drawings for each road, as defined in § 701.5 of this chapter, to be constructed, used, or...

  13. 30 CFR 784.24 - Road systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Road systems. 784.24 Section 784.24 Mineral... UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.24 Road... shall submit plans and drawings for each road, as defined in § 701.5 of this chapter, to be constructed...

  14. 30 CFR 784.24 - Road systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Road systems. 784.24 Section 784.24 Mineral... UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.24 Road... shall submit plans and drawings for each road, as defined in § 701.5 of this chapter, to be constructed...

  15. 30 CFR 780.37 - Road systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Road systems. 780.37 Section 780.37 Mineral... MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.37 Road systems... plans and drawings for each road, as defined in § 701.5 of this chapter, to be constructed, used, or...

  16. Suspended sediment and turbidity after road construction/improvement and forest harvest in streams of the Trask River Watershed Study, Oregon

    NASA Astrophysics Data System (ADS)

    Arismendi, Ivan; Groom, Jeremiah D.; Reiter, Maryanne; Johnson, Sherri L.; Dent, Liz; Meleason, Mark; Argerich, Alba; Skaugset, Arne E.

    2017-08-01

    Transport of fine-grained sediment from unpaved forest roads into streams is a concern due to the potential negative effects of additional suspended sediment on aquatic ecosystems. Here we compared turbidity and suspended sediment concentration (SSC) dynamics in five nonfish bearing coastal Oregon streams above and below road crossings, during three consecutive time periods ("before", "after road construction/improvement", and "after forest harvest and hauling"). We hypothesized that the combined effects of road construction/improvement and the hauling following forest harvest would increase turbidity and SSC in these streams. We tested whether the differences between paired samples from above and below road crossing exceeded various biological thresholds, using literature values of biological responses to increases in SSC and turbidity. Overall, we found minimal increases of both turbidity and SSC after road improvement, forest harvest, and hauling. Because flow is often used as a surrogate for turbidity or SSC we examined these relationships using data from locations above road crossings that were unaffected by roads or forest harvest and hauling. In addition, we examined the association between turbidity and SSC for these background locations. We found a positive, but in some cases weak association between flow and turbidity, and between flow and SSC; the relationship between turbidity and SSC was more robust, but also inconsistent among sites over time. In these low order streams, the concentrations and transport of suspended sediment seems to be highly influenced by the variability of local conditions. Our study provides an expanded understanding of current forest road management practice effects on fine-grained sediment in streams and introduces alternative metrics using multiple thresholds to evaluate potential indicators of biological relevance.

  17. The effectiveness of a barrier wall and underpasses in reducing wildlife mortality on a heavily traveled highway in Florida

    USGS Publications Warehouse

    Dodd, C.K.; Barichivich, W.J.; Smith, L.L.

    2004-01-01

    Because of high numbers of animals killed on Paynes Prairie State Preserve, Alachua County, Florida, the Florida Department of Transportation constructed a barrier wall-culvert system to reduce wildlife mortality yet allow for passage of some animals across the highway. During a one year study following construction, we counted only 158 animals, excluding hylid treefrogs, killed in the same area where 2411 road kills were recorded in the 12 months prior to the construction of the barrier wall-culvert system. Within the survey area lying directly in Paynes Prairie basin, mortality was reduced 65% if hylid treefrogs are included, and 93.5% with hylid treefrogs excluded. Sixty-four percent of the wildlife kills observed along the barrier wall-culvert system occurred at a maintenance road access point and along 300 m of type-A fence bordering private property. The 24 h kill rate during the post-construction survey was 4.9 compared with 13.5 during the pre-construction survey. We counted 1891 dead vertebrates within the entire area surveyed, including the ecotone between the surrounding uplands and prairie basin which did not include the barrier wall and culverts. Approximately 73% of the nonhylid road kills occurred in the 400 m section of road beyond the extent of the barrier wall-culvert system. We detected 51 vertebrate species, including 9 fish, using the 8 culverts after the construction of the barrier wall-culvert system, compared with 28 vertebrate species in the 4 existing culverts prior to construction. Capture success in culverts increased 10-fold from the pre-construction survey to the post-construction survey. Barrier wall trespass was facilitated by overhanging vegetation, maintenance road access, and by the use of the type-A fence. Additional problems resulted from siltation, water holes, and human access. These problems could be corrected using design modifications and by routine, periodic maintenance.

  18. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  19. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  20. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  1. 25 CFR 170.435 - How does BIA or the tribe determine the need for a public hearing?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads... change the layout or function of connecting or related roads or streets; (c) Would cause a substantial...

  2. Proof of concept : biocement for road repair.

    DOT National Transportation Integrated Search

    2015-03-01

    Road repair is an expensive operation every year. This cost can be greatly reduced if waste materials from the mining and biofuel : industries can be used to substitute conventional materials for road repair or construction. The objective of this pro...

  3. Geochemical anomalies from bottom ash in a road construction--comparison of the leaching potential between an ash road and the surroundings.

    PubMed

    Lind, Bo B; Norrman, Jenny; Larsson, Lennart B; Ohlsson, Sten-Ake; Bristav, Henrik

    2008-01-01

    A study was performed between June 2001 and December 2004 with the primary objective of assessing long-term leaching from municipal solid waste incineration bottom ash in a test road construction in relation to a reference road made up of conventional materials and the natural geochemical conditions in the surroundings. The metal leaching from the test road and the reference road was compared with the natural weathering in the regional surroundings for three time scales: 16, 80 and 1000 years. The results show that Cu and Zn cause a geochemical anomaly from the test road compared with the surroundings. The leaching of Cu from the test road is initially high but will decline with time and will in the long term be exceeded by natural weathering. Zn on the other hand has low initial leaching, which will increase with time and will in the long term exceed that of the test road and the surroundings by a factor of 100-300. For the other metals studied, Al, Na, K and Mg, there is only very limited leaching over time and the potential accumulation will not exceed the background values in a 1000 years.

  4. Assessment of the underground construction details of a road pavement using GPR antenna systems with different frequencies

    NASA Astrophysics Data System (ADS)

    Alani, Amir M.; Tosti, Fabio; Bianchini Ciampoli, Luca; Benedetto, Francesco; Benedetto, Andrea

    2017-04-01

    The assessment of the underground construction details of a road infrastructure is a problem of great concern in highway engineering. The case becomes complicated especially when damages reoccur after carrying out remedial surface maintenance and repair works over the life cycle of the infrastructure. The challenge will be exacerbated at the presence of underground watercourses, such that the geotechnical stability of the entire road structure could be threatened. In this respect, ground-penetrating radar (GPR) has been recognised and accepted as one of the most effective non-destructive testing (NDT) techniques that could be employed in identifying the cause/s of such problems. The recent advancements and developments made in the field of GPR hardware as well as the current level of understanding of the applications and processing techniques of the GPR data have immensely added to the reliability in the utilisation of this tool in variety of subsurface investigation projects. In view of this, the work presented in here focuses on the assessment of the underground construction details of a road pavement using different frequency GPR antenna systems. In addition to this, the possible presence and location of an underground watercourse was investigated in this work. The existence of the latter problem was perceived due to reoccurrence of longitudinal and traversal road surface cracking as well as subsidence at a particular location of the road. Reoccurrence of this damage was interpreted and related to the possible existence of an underground watercourse. The original design and the construction of the road were as such to prevent this movement. Therefore it seemed necessary to perform a GPR survey to investigate and confirm the underground construction details of the road. To this purpose, the identified area was surveyed using high to low frequency antennas with 2000 MHz, 900 MHz, 600 MHz and 200 MHz central frequencies of investigation. Scans were performed at 1m intervals in the direction of the road started from the reference (first) transversal axis located 5m behind the drain at the side of the road. The results obtained using the 2000 MHz antenna showed that the road construction consisted of an asphalt layer of 10 cm thickness overlaying a reinforced concrete block with two layers of rebar mesh. In addition, significant moisture damage and evidence of subsidence within the road were identified. The 900 MHz frequency antenna confirmed the above results as well as suggesting the existence of subsidence at the lower areas of the road foundation. Furthermore, results revealed the existence of an unidentified object at the deeper depth. This was not detected by the higher frequency antenna. The maximum depth of penetration was achieved by using the 600 MHz and the 200 MHz antennas (maximum of 3 m). To that effect this investigation did not identify or confirm the existence of any underground watercourse. Acknowledgement The authors acknowledge the COST Action TU1208 "Civil Engineering Applications of Ground Penetrating Radar" for providing networking and discussion opportunities throughout its activity and operation as well as facilitating prospect for publishing research outputs.

  5. Effects of Waste Plastic on the Physical and Rheological Properties of Bitumen

    NASA Astrophysics Data System (ADS)

    Ezree Abdullah, Mohd; Asyiqin Ahmad, Nurul; Putra Jaya, Ramadhansyah; Hassan, Norhidayah Abdul; Yaacob, Haryati; Rosli Hainin, Mohd

    2017-05-01

    Plastic disposal is one of the major problems for developing countries like Malaysia, at the same time Malaysia needs a large network of roads for its smooth economic and social development. The limited source of bitumen needs a deep thinking to ensure fast road construction. Therefore, the use of plastic waste in road construction not only can help to protect environment but also able to help the road construction industry. The aims of this research are to study the effects of waste plastic on rheological properties of bitumen. Modified bitumen was prepared by using blending techniques. Bitumen was heated and plastic waste was slowly added. Rheological properties of bitumen were performance by penetration, softening point, viscosity and direct shear rheometer test. The results showed that when content of plastic waste increase, the penetration value, softening point and viscosity of bitumen also increase. Generally, plastic waste improves the performance of bitumen when it was added into bitumen. It can be said that the usage helps to improve the performance of the road pavement which also reduces the rutting effect.

  6. The ecological impact assessment of a proposed road development (the Slovak approach)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Igondova, Erika, E-mail: erika.igondova@gmail.com; Pavlickova, Katarina, E-mail: pavlickova60@gmail.com; Majzlan, Oto, E-mail: majzlan@fns.uniba.sk

    The construction of roads is one of the most widespread forms of natural landscape modification. Over the last 20 years, dozens of road constructions have been assessed in Slovakia, which makes it possible to talk about methodological positives and negatives. A special feature of Slovakia is that many planned or renovated roads are located in protected areas or are in contact with them (including Natura 2000 sites). Therefore, it is important to understand the scope of the roads' ecological impacts and find ways for their appropriate evaluation and incorporation into the Environmental Impact Assessment process. For this reason, the Ecologicalmore » Impact Assessment methodology can be used as a basis for our research, which consists of three stages. In the first stage (scoping), a buffer circumventing the proposed road is created to determine the area for impact prediction and evaluation. Subsequently, the landscape structure and baseline landscape conditions are discussed, a map of current landscape structure is created and the current ecological status of the affected area is calculated. In the second stage (the evaluation of ecological resources), important ecological parts of the landscape are delineated. This step is based on the importance of previous information and its vulnerability, and leads to the mapping of the road ecological impact zone. In the third stage (impact assessment), important ecological parts are spatially correlated with the proposed road construction. Finally, the significance of ecological impacts of the activity is evaluated by applying specific criteria (duration, reversibility, magnitude, size and road ecological impact zone significance). A scale is proposed for each criterion to evaluate the total significance of impacts. In this way, detailed significant ecological impacts can be found which will help lead to proposed correct mitigation measures and a post-project analysis. - Highlights: • This paper proposes a methodology for the EcIA of road construction. • It tries to understand the spatial structure and configuration of landscape elements. • The most important ecological parts within the territory are identified. • The total significance of ecological receptors is evaluated by applying criteria.« less

  7. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    NASA Astrophysics Data System (ADS)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  8. Photographic copy of construction drawing, dated October 19, 1962, Department ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of construction drawing, dated October 19, 1962, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ALTER POL OPERATIONS, SHEET 1 OF 2, SLF 140-070 - Selfridge Field, Building No. 1445, Sugarbush Road north of Bunker Road, Mount Clemens, Macomb County, MI

  9. Some effects of logging and associated road construction on northern California streams

    Treesearch

    James W. Burns

    1972-01-01

    Abstract - The effects of logging and associated road construction on four California trout and salmon streams were investigated from 1966 through 1969. This study included measurements of streambed sedimentation, water quality, fish food abundance, and stream nursery capacity. Logging was found to be compatible with anadromous fish production when adequate attention...

  10. 77 FR 24673 - Grand Mesa, Uncompahgre and Gunnison National Forests; Colorado; Federal Coal Lease Modifications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-25

    ..., other soil disturbance may occur due to temporary road construction and drilling of methane drainage... soil disturbance may occur due to temporary road construction and drilling of methane drainage wells. A... scenic integrity of that landscape, as prescribed in the Forest Plan. Coal Mine Methane--The parent...

  11. A snapshot of summer 2001 work zone activity : based on information reported on state road closure and construction websites

    DOT National Transportation Integrated Search

    2003-02-01

    In a study sponsored by the Federal Highway Administration (FHWA), researchers conducted a survey of 789 work zones posted on 13 state road closure and construction websites during a two-week snapshot of the peak summer roadwork season in 2001. The g...

  12. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Standards for road design and construction. 223.38 Section 223.38 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER, SPECIAL FOREST PRODUCTS, AND FOREST BOTANICAL PRODUCTS Timber Sale Contracts...

  13. 11. Photographic copy of lines drawing of original construction (24 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN

  14. Developing design methods of concrete mix with microsilica additives for road construction

    NASA Astrophysics Data System (ADS)

    Dmitrienko, Vladimir; Shrivel, Igor; Kokunko, Irina; Pashkova, Olga

    2017-10-01

    Based on the laboratory test results, regression equations having standard cone and concrete strength, to determine the available amount of cement, water and microsilica were obtained. The joint solution of these equations allowed the researchers to develop the algorithm of designing heavy concrete compositions with microsilica additives for road construction.

  15. 23 CFR 658.23 - LCV freeze; cargo-carrying unit freeze.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... safety purposes and road construction, a State may make minor adjustments of a temporary and emergency... decision is reached that minor adjustments made by a State are not legitimately attributable to road or bridge construction or safety, the FHWA will inform the State, and the original conditions of the freeze...

  16. 76 FR 16440 - Endangered and Threatened Wildlife and Plants; Permits, Town of Apple Valley, San Bernardino...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...

  17. Road Maps for Learning: A Bird's Eye View

    ERIC Educational Resources Information Center

    Dunne, Timothy T.

    2011-01-01

    The notion of the road map, advocated by Black, Wilson, and Yao (2011), and the associated minutiae of the construct map have several powerful features. At one level these notions assist the teacher to select and embody a suitable sequence of constructs within a specified curriculum. Whatever disparate sequenced pathways individual learners may…

  18. Materials in Use in U.S. Interstate Highways

    USGS Publications Warehouse

    Sullivan, Daniel E.

    2006-01-01

    Summary: Natural aggregates (construction sand and gravel and crushed stone) make up the largest component of nonfuel mineral materials consumed in the United States. Most of these materials are used in construction activities, such as in buildings and roads. In highways, natural aggregates are incorporated into asphalt and concrete and are used as road base.

  19. 23 CFR Appendix C to Subpart B of... - Additional Required Contract Provisions, Appalachian Development Highway System and Local Access...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Additional Required Contract Provisions, Appalachian Development Highway System and Local Access Roads Contracts Other Than Construction Contracts C Appendix C to..., Appalachian Development Highway System and Local Access Roads Contracts Other Than Construction Contracts...

  20. 78 FR 45270 - Notice of Realty Action; Proposed Modified Competitive Sale of Public Land in Jackson County, Oregon

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... recreational), road construction, renovation, or road use, within 150 feet of waters of the State, including... Resource Area Field Manager, BLM Medford District Office, 3040 Biddle Road, Medford, OR 97504. ADDRESSES: Rik Arndt, Supervisory Realty Specialist, 3040 Biddle Road, Medford, OR 97504 or phone at 541-618-2239...

  1. Using photographic image analysis to assess ground cover: a case study of forest road cutbanks

    Treesearch

    Kevin C. Bold; Frederica Wood; Pamela J. Edwards; Karl W.J. Williard; Jon E. Schoonover

    2010-01-01

    Road prisms, including cutbanks, road surfaces, and fillslopes, can be important contributors of sediment to streams in forested watersheds. Following road construction, cutbanks and fillslopes are often seeded, mulched, and sometimes fertilized to limit erosion and sedimentation. Assessing the success of vegetation establishment on cutbanks and fillslopes is a common...

  2. A Landowner's Guide to Building Forest Access Roads

    Treesearch

    Richard L. Wiest

    1998-01-01

    This guide is designed for landowners in the northeastern United States who will use a tractor and ordinary earth moving equipment to build the simplest access roads on their property, or who will contract for these services. Logging roads on small woodland properties are usually constructed by the logging contractor, sawmill operator, or by a road contractor.

  3. Beyond the Byrd Road Act : VDOT's relationship with Virginia's urban counties.

    DOT National Transportation Integrated Search

    1998-01-01

    Since the Byrd Road Act of 1932, the Virginia Department of Transportation (VDOT) has been responsible for secondary road maintenance and construction in all of the state's counties except two (Arlington and Henrico). Such an arrangement is unusual a...

  4. US-23 aggregate test road long-term performance evaluation : final report.

    DOT National Transportation Integrated Search

    2017-03-24

    The US-23 Aggregate Test Road was constructed in 1992 with the main purpose to determine the influence of coarse : aggregate of varying frost susceptibility on long-term concrete durability. The pavement structure for the entire Test Road consists : ...

  5. The route of the Three Notch'd Road : a preliminary report.

    DOT National Transportation Integrated Search

    1975-01-01

    Of the many colonial roads constructed during the eighteenth century as settlement moved across Piedmont and Southside Virginia, a few have remained virtually intact and in service as state roads over most of their length. One of the most significant...

  6. 23 CFR 658.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the highways, including military equipment, farm equipment, implements of husbandry, road construction... Title 23, U.S.C. For the purpose of this regulation this system includes toll roads designated as... materials; and military vehicles transporting marked military equipment or materiel. Over-the-road bus. The...

  7. Identifying significant predictors of head-on conflicts on two-lane rural roads using inductive loop detectors data.

    PubMed

    Shariat-Mohaymany, Afshin; Tavakoli-Kashani, Ali; Nosrati, Hadi; Ranjbari, Andisheh

    2011-12-01

    To identify the significant factors that influence head-on conflicts resulting from dangerous overtaking maneuvers on 2-lane rural roads in Iran. A traffic conflict technique was applied to 12 two-lane rural roads in order to investigate the potential situations for accidents to occur and thus to identify the geometric and traffic factors affecting traffic conflicts. Traffic data were collected via the inductive loop detectors installed on these roads, and geometric characteristics were obtained through field observations. Two groups of data were then analyzed independently by Pearson's chi-square test to evaluate their relationship to traffic conflicts. The independent variables were percentage of time spent following (PTSF), percentage of heavy vehicles, directional distribution of traffic (DDT), mean speed, speed standard deviation, section type, road width, longitudinal slope, holiday or workday, and lighting condition. It was indicated that increasing the PTSF, decreasing the percentage of heavy vehicles, increasing the mean speed (up to 75 km/h), increasing DDT in the range of 0 to 60 percent, and decreasing the standard deviation of speed significantly increased the occurrence of traffic conflicts. It was also revealed that traffic conflicts occur more frequently on curve sections and on workdays. The variables road width, slope, and lighting condition were found to have a minor effect on conflict occurrence. To reduce the number of head-on conflicts on the aforementioned roads, some remedial measures are suggested, such as not constructing long "No Passing" zones and constructing passing lanes where necessary; keeping road width at the standard value; constructing roads with horizontal curves and a high radius and using appropriate road markings and overtaking-forbidden signs where it is impossible to modify the radius; providing enough light and installing caution signs/devices on the roads; and intensifying police control and supervision on workdays, especially in peak hours.

  8. Environmental impact assessment of wood ash utilization in forest road construction and maintenance--A field study.

    PubMed

    Oburger, Eva; Jäger, Anna; Pasch, Alexander; Dellantonio, Alex; Stampfer, Karl; Wenzel, Walter W

    2016-02-15

    The ever increasing use of wood material as fuel for green energy production requires innovative, environmentally safe strategies for recycling of the remaining wood ash. Utilizing wood ash in forest road construction and maintenance to improve mechanical stability has been suggested as a feasible recycling option. To investigate the environmental impact of wood ash application in forest road maintenance, a two-year field experiment was conducted at two Austrian forest sites (Kobernausserwald (KO) (soil pH 5.5) and Weyregg (WE) (pH 7.7)) differing in their soil chemical properties. Two different ashes, one produced by grate incineration (GA) and the other by fluidized bed incineration in a mixture with 15 vol% burnt lime (FBA), were incorporated in repeated road sections at a 15:85% (V/V) ash-to-soil rate. Leaching waters from the road body were collected and analyzed for 32 environmentally relevant parameters over two years. Upon termination of the experiment, sub-road soil samples were collected and analyzed for ash-related changes in soil chemistry. Even though a larger number of parameters was affected by the ash application at the alkaline site (WE), we observed the most pronounced initial increases of pH as well as Al, As, Fe, Mn, Ni, Co, Cu, Mo, and NO2(−) concentrations in leachates beneath GA-treated road bodies at Kobernausserwald due to the lower soil buffer capacity at this site. Despite the observed effects our results indicate that, when specific requirements are met (i.e. appropriate ash quality, sufficient soil buffer capacity below the road body, and single time-point ash incorporation within several decades), wood ash application in forest road construction is generally environmentally acceptable.

  9. Dynamic Analysis of an Office Building due to Vibration from Road Construction Activities

    NASA Astrophysics Data System (ADS)

    Chik, T. N. T.; Kamil, M. R. H.; Yusoff, N. A.; Ibrahim, M. H. W.

    2018-04-01

    Construction activities are widely known as one of the predominant sources of man-made vibrations that able to create nuisance towards any adjacent building, and this includes the road construction operations. Few studies conclude the construction-induced vibration may be harmful directly and indirectly towards the neighbouring building. This lead to the awareness of study the building vibration response of concrete masonry load bearing system and its vibrational performance towards the road construction activities. This study will simulate multi-storey office building of Sekolah Menengah Kebangsaan (SMK) Bandar Enstek at Negeri Sembilan by using finite element vibration analyses. The excitation of transient loads from ground borne vibrations which triggered by the road construction activities are modelled into the building. The vibration response was recorded during in-situ ambient vibration test by using Laser Doppler Vibrometer (LDV), which specifically performed on four different locations. The finite element simulation process was developed in the commercial FEA software ABAQUS. Then, the experimental data was processed and evaluated in MATLAB ModalV to assess the vibration criteria of the floor in building. As a result, the vibration level of floor in building is fall under VC-E curve which was under the maximum permissible level for office building (VC-ISO). The vibration level on floor is acceptable within the limit that have been referred.

  10. Caspar Creek ecology project: annual report, 1967-68

    Treesearch

    John W. DeWitt

    1968-01-01

    Two summers of calibration of the north and south fork Caspar Creek stream ecology study areas were completed in 1967. Clearing for logging road construction in the south fork watershed began in May, 1957. Bulldozer operations first reached the stream itself in July. Some calibration determinations were made during the period of road construction and stream clearance...

  11. Surface Erosion Control Techniques on Newly Constructed Forest Roads

    Treesearch

    Johnny M. Grace; John Wilhoit; Robert Rummer; Bryce Stokes

    1999-01-01

    A newly constructed forest road was treated with three erosion control treatments: wood excelsior erosion mat, native grass species, and exotic grass species. The study evaluates treatment methods on the basis of sediment reduction and runoff volume reduction compared to no treatment. The erosion mat treatment was most effective in mitigating erosion losses with a 98...

  12. An eco-efficient and economical optimum evaluation technique for the forest road networks: the case of the mountainous forest of Metsovo, Greece.

    PubMed

    Tampekis, Stergios; Samara, Fani; Sakellariou, Stavros; Sfougaris, Athanassios; Christopoulou, Olga

    2018-02-12

    The sustainable forest management can be achieved only through environmentally sound and economically efficient and feasible forest road networks and transportation systems that can potentially improve the multi-functional use of forest resources. However, road network planning and construction suggest long-term finance that require a capital investment (cash outflow), which would be equal to the value of the total revenue flow (cash inflow) over the whole lifecycle project. This paper emphasizes in an eco-efficient and economical optimum evaluation method for the forest road networks in the mountainous forest of Metsovo, Greece. More specifically, with the use of this technique, we evaluated the forest roads' (a) total construction costs, (b) annual maintenance cost, and (c) log skidding cost. In addition, we estimated the total economic value of forest goods and services that are lost from the forest roads' construction. Finally, we assessed the optimum eco-efficient and economical forest roads densities based on linear equations that stem from the internal rate of return method (IRR) and have been presented graphically. Data analysis and its presentation are achieved with the contribution of geographic information systems (GIS). The technique which is described in this study can be for the decision makers an attractive and useful implement in order to select the most eco-friendly and economical optimum solution to plan forest road network or to evaluate the existing forest transportation systems. Hence, with the use of this method, we can combine not only the multi-objective utilization of natural resources but also the environmental protection of forest ecosystems.

  13. Impact of grade separator on pedestrian risk taking behavior.

    PubMed

    Khatoon, Mariya; Tiwari, Geetam; Chatterjee, Niladri

    2013-01-01

    Pedestrians on Delhi roads are often exposed to high risks. This is because the basic needs of pedestrians are not recognized as a part of the urban transport infrastructure improvement projects in Delhi. Rather, an ever increasing number of cars and motorized two-wheelers encourage the construction of large numbers of flyovers/grade separators to facilitate signal free movement for motorized vehicles, exposing pedestrians to greater risk. This paper describes the statistical analysis of pedestrian risk taking behavior while crossing the road, before and after the construction of a grade separator at an intersection of Delhi. A significant number of pedestrians are willing to take risks in both before and after situations. The results indicate that absence of signals make pedestrians behave independently, leading to increased variability in their risk taking behavior. Variability in the speeds of all categories of vehicles has increased after the construction of grade separators. After the construction of the grade separator, the waiting time of pedestrians at the starting point of crossing has increased and the correlation between waiting times and gaps accepted by pedestrians show that after certain time of waiting, pedestrians become impatient and accepts smaller gap size to cross the road. A Logistic regression model is fitted by assuming that the probability of road crossing by pedestrians depends on the gap size (in s) between pedestrian and conflicting vehicles, sex, age, type of pedestrians (single or in a group) and type of conflicting vehicles. The results of Logistic regression explained that before the construction of the grade separator the probability of road crossing by the pedestrian depends on only the gap size parameter; however after the construction of the grade separator, other parameters become significant in determining pedestrian risk taking behavior. Copyright © 2012 Elsevier Ltd. All rights reserved.

  14. Design of Large Stone Asphalt Mixes for Low-Volume Roads Using Six-Inch Diameter Marshall Specimens

    DOT National Transportation Integrated Search

    1991-01-01

    Premature rutting of road pavements constructed for hauling coal and logs is common. Although these roads carry low volumes of traffic, they are subjected to heavy and channelized wheel loads. Unfortunately, conventional asphalt mixes containing aggr...

  15. Spatial Extent of the Impact of Transported Road Materials on the Ecological Function of Forested Landscapes

    DOT National Transportation Integrated Search

    2012-08-16

    Roads have varied ecological impacts on the adjacent plant and soil environment due to physical and chemical disturbances resulting from roadway construction, roadside maintenance, and vehicle deposition. The two main areas influenced by a road are t...

  16. 78 FR 10214 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-13

    ... related to grants, land surveys, and engineering, geospatial, and road construction projects. 3... Management Services (ACNR) using one of the following means: Mail: NARA (ACNR), 8601 Adelphi Road, College...), National Archives and Records Administration, 8601 Adelphi Road, College Park, MD 20740-6001. Telephone...

  17. The road surveying system of the federal highway research institute - a performance evaluation of road segmentation algorithms

    NASA Astrophysics Data System (ADS)

    Streiter, R.; Wanielik, G.

    2013-07-01

    The construction of highways and federal roadways is subject to many restrictions and designing rules. The focus is on safety, comfort and smooth driving. Unfortunately, the planning information for roadways and their real constitution, course and their number of lanes and lane widths is often unsure or not available. Due to digital map databases of roads raised much interest during the last years and became one major cornerstone of innovative Advanced Driving Assistance Systems (ADASs), the demand for accurate and detailed road information increases considerably. Within this project a measurement system for collecting high accurate road data was developed. This paper gives an overview about the sensor configuration within the measurement vehicle, introduces the implemented algorithms and shows some applications implemented in the post processing platform. The aim is to recover the origin parametric description of the roadway and the performance of the measurement system is being evaluated against several original road construction information.

  18. Assessment of the PCDD/F fate from MSWI residue used in road construction in France.

    PubMed

    Badreddine, R; François, D

    2009-01-01

    MSWI fly ash is susceptible to contain high amount of polychlorinated dibenzo-dioxins and polychlorinated dibenzo-furans. However, the use of MSWI residue for road construction started in France at a period when MSWI Bottom Ash and MSWI fly ash were not separated. From four old road sites, MSWI residue, road soils, reference soils and geo-textiles were sampled and their PCDD/F contents were analyzed. MSWI residue show a great heterogeneity but also high amounts of PCDD/F (14-2960 ng I-TEQ kg(-1)dm). Soils underlying the road show less heterogeneity and PCDD/F contents between 0.57 and 7.23 ng I-TEQ kg(-1)dm, lower than ordinary soils. Moreover, the specific analysis of the 17 toxic PCDD/F congeners (notably the 2,3,7,8-TetraCDD) indicates the very low harmfulness of road soils. The study also allows to assert the relation between the MSWI residue particle size and the PCDD/F content.

  19. Research on Surfactant Warm Mix Asphalt Construction Technology

    NASA Astrophysics Data System (ADS)

    Li, Guoliang; Sun, Jingxin; Guo, Xiufeng

    Discharging temperature of hot asphalt mixture is about 150°C-185°C, volatilization of asphalt fume harms people's health and fuel cost is high. Jinan Urban Construction Group applies PTL/01 asphalt warm mix agent to produce warm mix asphalt to construction of urban roads' asphalt bituminous pavement. After comparing it with performance of traditional hot asphalt mixture, mixing temperature may be reduced by 30°C-60°C, emission of poisonous gas is reduced, energy conservation and environmental protection are satisfied, construction quality reaches requirements of construction specifications and economic, social and environmental benefits are significant. Thus, it can be used for reference for green construction of urban roads.

  20. A Method for Extracting Road Boundary Information from Crowdsourcing Vehicle GPS Trajectories.

    PubMed

    Yang, Wei; Ai, Tinghua; Lu, Wei

    2018-04-19

    Crowdsourcing trajectory data is an important approach for accessing and updating road information. In this paper, we present a novel approach for extracting road boundary information from crowdsourcing vehicle traces based on Delaunay triangulation (DT). First, an optimization and interpolation method is proposed to filter abnormal trace segments from raw global positioning system (GPS) traces and interpolate the optimization segments adaptively to ensure there are enough tracking points. Second, constructing the DT and the Voronoi diagram within interpolated tracking lines to calculate road boundary descriptors using the area of Voronoi cell and the length of triangle edge. Then, the road boundary detection model is established integrating the boundary descriptors and trajectory movement features (e.g., direction) by DT. Third, using the boundary detection model to detect road boundary from the DT constructed by trajectory lines, and a regional growing method based on seed polygons is proposed to extract the road boundary. Experiments were conducted using the GPS traces of taxis in Beijing, China, and the results show that the proposed method is suitable for extracting the road boundary from low-frequency GPS traces, multi-type road structures, and different time intervals. Compared with two existing methods, the automatically extracted boundary information was proved to be of higher quality.

  1. A Method for Extracting Road Boundary Information from Crowdsourcing Vehicle GPS Trajectories

    PubMed Central

    Yang, Wei

    2018-01-01

    Crowdsourcing trajectory data is an important approach for accessing and updating road information. In this paper, we present a novel approach for extracting road boundary information from crowdsourcing vehicle traces based on Delaunay triangulation (DT). First, an optimization and interpolation method is proposed to filter abnormal trace segments from raw global positioning system (GPS) traces and interpolate the optimization segments adaptively to ensure there are enough tracking points. Second, constructing the DT and the Voronoi diagram within interpolated tracking lines to calculate road boundary descriptors using the area of Voronoi cell and the length of triangle edge. Then, the road boundary detection model is established integrating the boundary descriptors and trajectory movement features (e.g., direction) by DT. Third, using the boundary detection model to detect road boundary from the DT constructed by trajectory lines, and a regional growing method based on seed polygons is proposed to extract the road boundary. Experiments were conducted using the GPS traces of taxis in Beijing, China, and the results show that the proposed method is suitable for extracting the road boundary from low-frequency GPS traces, multi-type road structures, and different time intervals. Compared with two existing methods, the automatically extracted boundary information was proved to be of higher quality. PMID:29671792

  2. LUR models for particulate matters in the Taipei metropolis with high densities of roads and strong activities of industry, commerce and construction.

    PubMed

    Lee, Jui-Huna; Wu, Chang-Fu; Hoek, Gerard; de Hoogh, Kees; Beelen, Rob; Brunekreef, Bert; Chan, Chang-Chuan

    2015-05-01

    Traffic intensity, length of road, and proximity to roads are the most common traffic indicators in the land use regression (LUR) models for particulate matter in ESCAPE study areas in Europe. This study explored what local variables can improve the performance of LUR models in an Asian metropolis with high densities of roads and strong activities of industry, commerce and construction. By following the ESCAPE procedure, we derived LUR models of PM₂.₅, PM₂.₅ absorbance, PM₁₀, and PMcoarse (PM₂.₅-₁₀) in Taipei. The overall annual average concentrations of PM₂.₅, PM₁₀, and PMcoarse were 26.0 ± 5.6, 48.6 ± 5.9, and 23.3 ± 3.1 μg/m(3), respectively, and the absorption coefficient of PM₂.₅ was 2.0 ± 0.4 × 10(-5)m(-1). Our LUR models yielded R(2) values of 95%, 96%, 87%, and 65% for PM₂.₅, PM₂.₅ absorbance, PM₁₀, and PMcoarse, respectively. PM₂.₅ levels were increased by local traffic variables, industrial, construction, and residential land-use variables and decreased by rivers; while PM₂.₅ absorbance levels were increased by local traffic variables, industrial, and commercial land-use variables in the models. PMcoarse levels were increased by elevated highways. Road area explained more variance than road length by increasing the incremental value of 27% and 6% adjusted R(2) for PM₂.₅ and PM₁₀ models, respectively. In the PM₂.₅ absorbance model, road area and transportation facility explain 29% more variance than road length. In the PMcoarse model, industrial and new local variables instead of road length improved the incremental value of adjusted R(2) from 39% to 60%. We concluded that road area can better explain the spatial distribution of PM₂.₅ and PM₂.₅ absorbance concentrations than road length. By incorporating road area and other new local variables, the performance of each PM LUR model was improved. The results suggest that road area is a better indicator of traffic intensity rather than road length in a city with high density of road network and traffic. Copyright © 2015 Elsevier B.V. All rights reserved.

  3. Optimization of a pavement instrumentation plan for a full-scale test road : evaluation.

    DOT National Transportation Integrated Search

    2014-04-01

    A 2.5-mile, concrete test road is planned for construction by the Florida Department of Transportation (FDOT) in : 2016. To support the goals of the test road, a comprehensive instrumentation system is required to provide : reliable data over a long ...

  4. Economic comparisons of haul road construction versus forwarding versus longer skid distances

    Treesearch

    Michael D. Erickson; Curt C. Hassler; Chris B. LeDoux

    1992-01-01

    There currently exists no set of basic guidelines for Appalachian loggers to use in the decision making process for selecting the best way to harvest a tract of timber. Specifically, guidelines are needed for deciding between the alternatives of constructing truck haul roads to access an area or other alternatives such as skidding or forwarding timber longer distances...

  5. Combined research effort on aggregate road materials

    NASA Astrophysics Data System (ADS)

    Kuznetsova, Elena; Hoff, Inge; Willy Danielsen, Svein; Wigum, Børge Johannes; Fladvad, Marit; Rieksts, Karlis; Loranger, Benoit; Barbieri, Diego

    2017-04-01

    In European countries, the average aggregate consumption per capita is 5 tons per year (European Aggregates Association 2016), while the corresponding number in Norway is 11 tons (Neeb 2015). Due to the increased demand for sand and gravel for construction purposes, e.g. in road construction, the last decade has seen a significant trend towards the use of crushed rock aggregates. Neeb (2015) reports that half of the Norwegian aggregate production (sand, gravel and crushed rock) is used for road construction, and 33 % of the overall sold tonnage of crushed rock is exported. This resource has been more and more preferred over sand and gravel due to the significant technological development of its process and utilization phase. In Norway, the development and implementation of crushed aggregate technology has been the main approach to solve natural resource scarcity (Danielsen and Kuznetsova 2015). In order to reduce aggregates transportation, it is aimed to use local aggregates and aggregates processed from rock excavations, tunneling, road cuts, etc. One issue focused in this research is the influence from blasting and processing on the final quality of the crushed aggregates, specifically relating to the properties for road construction purposes. It is therefor crucial to plan utilization of available materials for use in different road layers following the same production line. New developments and improved availability of mobile crushing and screening equipment could produce more sustainable and profitable sources of good quality aggregate materials from small volume deposits in proximity to construction sites. One of the biggest challenges today to use these materials is that the pavement design manual sets rigid requirements for pavement layers. Four research projects are being conducted in Norway to improve the use of local materials for road construction. Four aspects are to be covered by the research: a) geological characteristics of the materials, their b) mechanical and c) thermal properties, and d) frost action and susceptibility. The main goal of the PhD topic N1 is to achieve better utilization of aggregate resources through adjusting the production process according to local geological conditions and construction needs. The objective of the PhD project N2 is to look at the design stage and find the way to use these aggregates anyway by changing the road's design (e.g. increasing the thickness of asphalt layer). Fine particles content will also be harder to control due to rock type variability from site to site. Thus, PhD project N3 is going to investigate the effect of the increasing of fines and their mineralogy on frost action related problems during freezing and thawing seasons. Finally, PhD project N4 is investigating how the grading and mineralogy of the crushed rock material affects the heat exchange in road's granular layers and consequently, the frost penetration depth. Combining these PhD studies we aim to create a holistic approach for a new understanding within this very complex area.

  6. 75 FR 62919 - Notice of Final Federal Agency Actions on the Route 250 Bypass Interchange at McIntire Road...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... on the Route 250 Bypass Interchange at McIntire Road Project in Virginia AGENCY: Federal Highway.... 139(l)(1). The actions relate to the Route 250 Bypass Interchange at McIntire Road project in the City... Virginia: Route 250 Bypass Interchange at McIntire Road. The project would involve construction of a grade...

  7. Reclamation of skid roads with fiber mats and native vegetation: effects on erosion

    Treesearch

    shawn T. Grushecky; David w. McGill; William Grafton; John Edwards; Lisa Tager

    2007-01-01

    A research study was established to test the effectiveness of fiber mats and native seed mixtures in reducing soil erosion from newly-constructed skid roads in the Elk River Watershed in central West Virginia. Twelve road sections of equal grade were paired with a randomly-selected section receiving a fiber mat and native grass seed while the other road section was not...

  8. 41. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. VIEW FROM APPROXIMATELY THE SAME SPOT SHOWING HOW COVERING THE ROCK FILLS WITH SOIL HAS ALMOST OBLITERATED THESE SCARS. TO IDENTIFY A POINT FOR COMPARISON NOTICE THE BRIDE GULCH JUST TO THE LEFT OF THE CENTER IN THE UPPER PICTURE AND COMPARE WITH THE SAME GULCH IN THE LOWER PICTURE. THE AFTER PHOTO OF A BEFORE AND AFTER SET. BEFORE PHOTO IS HI-52-40. - Haleakala National Park Roads, Pukalani, Maui County, HI

  9. 36 CFR 212.6 - Ingress and egress.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... intermingled or adjacent landowners. Construction, reconstruction or maintenance of a road or highway requires... over the same and use of existing National Forest System roads and trails in order to reach their homes... regulations governing the protection and administration of the lands and the roads or trails to be used. (c...

  10. 75 FR 31418 - Intermountain Region, Payette National Forest, Council Ranger District; Idaho; Mill Creek-Council...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ... noncommercial vegetation management and road system modifications and maintenance. DATES: Comments concerning..., timber harvest (especially large diameter ponderosa pine) and road construction have affected forest.... There would be no equipment entry in riparian conservation areas (RCAs) except on existing roads or skid...

  11. MnROAD cells 16-23 (phase II) : forensic investigation into recycled unbound base and asphalt surface materials.

    DOT National Transportation Integrated Search

    2017-06-01

    This report presents the findings from an eight-year performance evaluation of eight cells (Cells 16-23) built at the Minnesota Road Research Facility (MnROAD) in 2008. The constructed cells were used for two performance evaluation studies of: 1) unb...

  12. 36 CFR § 1004.21 - Speed limits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... determine the speed of a vehicle on a Presidio Trust road. Signs indicating that vehicle speed is determined... hour: upon sections of Presidio Trust road under repair or construction. (3) 45 miles per hour: upon all other Presidio Trust roads. (b) The Board may designate a different speed limit upon any Presidio...

  13. 75 FR 57499 - Notice of Temporary Closure of Public Lands in Fergus County, MT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-21

    ... BLM has contracted for road construction into the damaged area, salvage logging, and reclamation of the road once salvage logging is completed and administrative access is no longer needed. In the interim, the mixture of heavy equipment, a narrow temporary road, logging operations, steep slopes...

  14. Ground-water problems in highway construction and maintenance

    USGS Publications Warehouse

    Rasmussen, W.C.; Haigler, L.B.

    1953-01-01

    This report discusses the occurrence of ground water in relation to certain problems in highway construction and maintenance. These problems are: the subdrainage of roads; quicksand; the arrest of soil creep in road cuts; the construction of lower and larger culverts necessitated by the farm-drainage program; the prevention of failure of bridge abutments and retaining walls; and the water-cement ratio of sub-water-table concrete. Although the highway problems and suggested solutions are of general interest, they are considered with special reference to the State of Delaware, in relation to the geology of that State. The new technique of soil stabilization by electroosmosis is reviewed in the hope that it might find application here in road work and pile setting, field application by the Germans and Russians is reviewed.

  15. [Purveyors of technology: provincial engineers and the construction of road infrastructure in Minas Gerais].

    PubMed

    Barbosa, Lidiany Silva

    2011-01-01

    The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.

  16. Bio-monitoring for the genotoxic assessment in road construction workers as determined by the buccal micronucleus cytome assay.

    PubMed

    Çelik, Ayla; Yildirim, Seda; Ekinci, Seda Yaprak; Taşdelen, Bahar

    2013-06-01

    Buccal micronucleus cytome (BMCyt) assay monitors genetic damage, cell proliferation and cell death in humans exposed to occupational and environmental agents. BMCyt is used as an indicator of genotoxic exposure, since it is associated with chromosomal instability. There is little research on the occupational exposure among road construction workers for genotoxicity testing. In the present study, we evaluated MN frequencies and other nuclear changes, karyorrhexis (KR), karyolysis (KL), broken egg (BE), binucleate (BN), condensed chromatin cell (CCC), and picnotic cell (PC) in buccal mucosa cells of 40 road construction workers (twenty smokers and twenty non-smokers) and 40 control groups consisting of healthy persons (twenty smokers and twenty non-smokers). Microscopic observation was performed of 2000 cells per individual in both road construction workers and control group. In control and worker groups, for each person repair index (RI) was calculated via formula KR+L/BE+MN. The results showed a statistically significant increase in the frequency of MN in buccal epithelial cells of exposed group compared with control group (p<0.001). There is no significant difference between smokers and non-smokers for incidence of MN or nuclear changes and value of RI in exposed group. In road construction workers, RI is lower than the control group. There is a significant difference between workers and control group (p<0.001) for RI. Our data reveal that asphalt fumes during road paving operations are absorbed by workers and that asphalt fume exposure is able to significantly induce cytogenetic damage in buccal mucosa cells of workers after controlling some possible confounding factors, such as age, sex and smoking habits. In addition to determination of nuclear changes and the micronucleus, the determination of RI value presents a new approach to genotoxic bio-monitoring assessment studies of occupationally exposed population. Copyright © 2013 Elsevier Inc. All rights reserved.

  17. 25 CFR 170.402 - What is the tribal role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... transportation related meetings; (9) Performing transportation planning for operational and maintenance...

  18. 25 CFR 170.401 - What is BIA's role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... maintenance facilities; and (p) Researching rights-of-way documents for project planning. ...

  19. Roads, interrupted dispersal, and genetic diversity in timber rattlesnakes.

    PubMed

    Clark, Rulon W; Brown, William S; Stechert, Randy; Zamudio, Kelly R

    2010-08-01

    Anthropogenic habitat modification often creates barriers to animal movement, transforming formerly contiguous habitat into a patchwork of habitat islands with low connectivity. Roadways are a feature of most landscapes that can act as barriers or filters to migration among local populations. Even small and recently constructed roads can have a significant impact on population genetic structure of some species, but not others. We developed a research approach that combines fine-scale molecular genetics with behavioral and ecological data to understand the impacts of roads on population structure and connectivity. We used microsatellite markers to characterize genetic variation within and among populations of timber rattlesnakes (Crotalus horridus) occupying communal hibernacula (dens) in regions bisected by roadways. We examined the impact of roads on seasonal migration, genetic diversity, and gene flow among populations. Snakes in hibernacula isolated by roads had significantly lower genetic diversity and higher genetic differentiation than snakes in hibernacula in contiguous habitat. Genetic-assignment analyses revealed that interruption to seasonal migration was the mechanism underlying these patterns. Our results underscore the sizeable impact of roads on this species, despite their relatively recent construction at our study sites (7 to 10 generations of rattlesnakes), the utility of population genetics for studies of road ecology, and the need for mitigating effects of roads.

  20. 77 FR 13683 - Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: Highway US-30...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ...\\ cent of the sales tax revenue for road construction projects for the next 20 years, beginning in 2013... Department of Roads to fund the project entirely with newly acquired state funds. NDOR plans to have the...) and determined that funding for construction of the project was not likely to be available for the...

  1. 25 CFR 170.451 - Can IRR Program funds be used for archeological and environmental compliance?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Environmental and Archeological Requirements § 170.451 Can IRR Program...) and (c)(8) and 25 CFR 1000.243(b) and applicable tribal laws for: (a) Road and bridge rights-of-way...

  2. 25 CFR 170.451 - Can IRR Program funds be used for archeological and environmental compliance?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Environmental and Archeological Requirements § 170.451 Can IRR Program...) and (c)(8) and 25 CFR 1000.243(b) and applicable tribal laws for: (a) Road and bridge rights-of-way...

  3. 25 CFR 170.451 - Can IRR Program funds be used for archeological and environmental compliance?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Environmental and Archeological Requirements § 170.451 Can IRR Program...) and (c)(8) and 25 CFR 1000.243(b) and applicable tribal laws for: (a) Road and bridge rights-of-way...

  4. 25 CFR 170.451 - Can IRR Program funds be used for archeological and environmental compliance?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Environmental and Archeological Requirements § 170.451 Can IRR Program...) and (c)(8) and 25 CFR 1000.243(b) and applicable tribal laws for: (a) Road and bridge rights-of-way...

  5. Future Directions: An Alternate Organizational Lens on Middle-of-the-Road Education Reforms

    ERIC Educational Resources Information Center

    Mercado-Garcia, Diana

    2017-01-01

    This essay response critically examines and expands on the arguments put forth by the authors of "Navigating Middle-of-the-Road Reforms through Collaborative Community." Using organizational theory, the paper clarifies questions about the theoretical construct of collaborative community and middle-of-the-road reforms. It concludes by…

  6. 14. VIEW OF THE END OF THE PROPOSED RECONSTRUCTION ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. VIEW OF THE END OF THE PROPOSED RECONSTRUCTION ON THE KINGS CANYON ROAD AND THE PROPOSED LOCATION OF THE NON-SYSTEM SPUR ROAD WHICH WILL BE CONSTRUCTED TO HELICOPTER LANDING #13. LOCATED AT MILEPOST 1.92, FACING NORTH 760 EAST (76 ). - Kings Canyon Road, Carson City, Carson City, NV

  7. 40 CFR 1037.631 - Exemption for vocational vehicles intended for off-road use.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... intended to be used extensively in off-road environments such as forests, oil fields, and construction... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Exemption for vocational vehicles intended for off-road use. 1037.631 Section 1037.631 Protection of Environment ENVIRONMENTAL PROTECTION...

  8. 40 CFR 1037.631 - Exemption for vocational vehicles intended for off-road use.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... intended to be used extensively in off-road environments such as forests, oil fields, and construction... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Exemption for vocational vehicles intended for off-road use. 1037.631 Section 1037.631 Protection of Environment ENVIRONMENTAL PROTECTION...

  9. 40 CFR 1037.631 - Exemption for vocational vehicles intended for off-road use.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... intended to be used extensively in off-road environments such as forests, oil fields, and construction... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Exemption for vocational vehicles intended for off-road use. 1037.631 Section 1037.631 Protection of Environment ENVIRONMENTAL PROTECTION...

  10. 77 FR 53839 - Shasta-Trinity National Forest; California; East McCloud Plantations Thinning Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... actions include road maintenance and reconstruction of National Forest System, new road construction and addition of new roads and selected existing unauthorized routes to the Forest Transportation System to.... The project's legal description is: Portions of Township (T.) 39 North (N.), Range (R.) 1-3 East (E...

  11. 78 FR 72706 - Notice of Inventory Completion: Michigan State Police, Houghton Lake Post, Houghton Lake, MI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... remains were collected during road construction in Saginaw County by a private citizen and stored in a... City Road, Houghton Lake, MI 48629, telephone (989) 422-6923, email [email protected] Road, Houghton Lake, MI 48629, telephone (989) 422-6923, email [email protected] , by January 2...

  12. Preliminary Draft Environmental Impact Statement. Electronic Combat Test Capability, Utah Test and Training Range

    DTIC Science & Technology

    1989-07-01

    operations beginning in 1996 . Until that time, staging will be conducted from Hill AFB and Michael AAF. ES-26 HE wF-lr 7,rr)~f~)~ ~ D 0t- 0 0 4J 444(U 44’ -P...constructed over a period of years (1990- 1996 ). Where possible, the network will follow existing or proposed new roads to minimize ground disturbance...attendant roads, power lines, and fiber optics between 1991 and 1996 . 4. Construction of a gapfiller radar in 1992. 5. Construction of TTA range

  13. 49 CFR 177.834 - General requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... as to prohibit the fueling of machinery or vehicles used in road construction or maintenance. (i... transit; fueling road units. Reasonable care should be taken to prevent undue rise in temperature of...

  14. 25 CFR 170.400 - What is the purpose of transportation planning?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... address current and future land use, economic development, traffic demand, public safety, health, and...

  15. Image feature based GPS trace filtering for road network generation and road segmentation

    DOE PAGES

    Yuan, Jiangye; Cheriyadat, Anil M.

    2015-10-19

    We propose a new method to infer road networks from GPS trace data and accurately segment road regions in high-resolution aerial images. Unlike previous efforts that rely on GPS traces alone, we exploit image features to infer road networks from noisy trace data. The inferred road network is used to guide road segmentation. We show that the number of image segments spanned by the traces and the trace orientation validated with image features are important attributes for identifying GPS traces on road regions. Based on filtered traces , we construct road networks and integrate them with image features to segmentmore » road regions. Lastly, our experiments show that the proposed method produces more accurate road networks than the leading method that uses GPS traces alone, and also achieves high accuracy in segmenting road regions even with very noisy GPS data.« less

  16. Image feature based GPS trace filtering for road network generation and road segmentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuan, Jiangye; Cheriyadat, Anil M.

    We propose a new method to infer road networks from GPS trace data and accurately segment road regions in high-resolution aerial images. Unlike previous efforts that rely on GPS traces alone, we exploit image features to infer road networks from noisy trace data. The inferred road network is used to guide road segmentation. We show that the number of image segments spanned by the traces and the trace orientation validated with image features are important attributes for identifying GPS traces on road regions. Based on filtered traces , we construct road networks and integrate them with image features to segmentmore » road regions. Lastly, our experiments show that the proposed method produces more accurate road networks than the leading method that uses GPS traces alone, and also achieves high accuracy in segmenting road regions even with very noisy GPS data.« less

  17. Solidification/stabilization of dredged marine sediments for road construction.

    PubMed

    Wang, Dong Xing; Abriak, Nor Edine; Zentar, Rachid; Xu, WeiYa

    2012-01-01

    Cement/lime-based solidification is an environmentally sound solution for the management of dredged marine sediments, instead of traditional solutions such as immersion. Based on the mineralogical composition and physical characteristics of Dunkirk sediments, the effects of cement and lime are assessed through Atterberg limits, modified Proctor compaction, unconfined compressive strength and indirect tensile strength tests. The variation of Atterberg limits and the improvement in strength are discussed at different binder contents. The potential of sediments solidified with cement or lime for road construction is evaluated through a proposed methodology from two aspects: I-CBR value and material classification. The test results show the feasibility of solidified dredged sediments for beneficial use as a material in road construction. Cement is superior to lime in terms of strength improvement, and adding 6% cement is an economic and reasonable method to stabilize fine sediments.

  18. Towards high-performance materials for road construction

    NASA Astrophysics Data System (ADS)

    Gladkikh, V.; Korolev, E.; Smirnov, V.

    2017-10-01

    Due to constant increase of traffic, modern road construction is in need of high-performance pavement materials. The operational performance of such materials can be characterized by many properties. Nevertheless, the most important ones are resistance to rutting and resistance to dynamical loads. It was proposed earlier to use sulfur extended asphalt concrete in road construction practice. To reduce the emission of sulfur dioxide and hydrogen sulfide during the concrete mix preparation and pavement production stages, it is beneficial to make such a concrete on the base of complex sulfur modifier. In the present work the influence of the complex modifier to mechanical properties of sulfur extended asphalt concrete was examined. It was shown that sulfur extended asphalt concrete is of high mechanical properties. It was also revealed that there as an anomalous negative correlations between strain capacity, fatigue life and fracture toughness.

  19. General Conformity Training Modules: Appendix A Sample Emissions Calculations

    EPA Pesticide Factsheets

    Appendix A of the training modules gives example calculations for external and internal combustion sources, construction, fuel storage and transfer, on-road vehicles, aircraft operations, storage piles, and paved roads.

  20. 76 FR 2411 - Notice of Designation of Elkhorn Ridge Wilderness, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... logging operations and associated road construction remain, the BLM has determined that the benefits of..., 1695 Heindon Road, Arcata, California 95521. Detailed information concerning this action is available...

  1. Quantification of the effects of environmental leaching factors on emissions from bottom ash in road construction.

    PubMed

    Ecke, Holger; Aberg, Annika

    2006-06-01

    The re-use of bottom ash in road construction necessitates a tool to predict the impact of trace metals on the surroundings over the lifetime of the road. The aim of this work was to quantify the effect of environmental factors that are supposed to influence leaching, so as to suggest guidelines in developing a leaching procedure for the testing of incineration residues re-used in road constructions. The effects of pH, L/S (liquid-to-solid ratio), leaching time, and leaching atmosphere on the leachate concentrations of Cd, Cr, Cu, Ni, Pb, and Zn were studied using a two-level full factorial design. The most significant factor for all responses was the pH, followed by L/S, though the importance of pH and L/S is often ignored in leaching tests. Multiple linear regression models describing the variation in leaching data had R(2) values ranging from 61-97%. A two-step pH-stat leaching procedure that considers pH as well as L/S and leaching time was suggested.

  2. Comparison of the yields of downstream migrant salmonids before and after logging and road construction on the South Fork Caspar Creek, Mendocino County

    Treesearch

    David S. Graves; James W. Burns

    1970-01-01

    Yields of juvenile steelhead rainbow trout Salmo gairdnerii gairdnerii) and silver salmon (Oncorhynchus kisutch) emigrants were compared in South Fork Caspar Creek, a small coastal stream in Mendocino County, California, before and after construction of a logging road along the stream in the summer of 1967. Numbers, lengths, and age class structures were compared....

  3. Development of a Transportation System in Iran

    DTIC Science & Technology

    1979-06-01

    different capitals. A method of road building was developed I that consisted of paving the softer parts of the road and even of making artificial ruts...abstract entered in Block 20, If different from Report) 18. S U P P L E M E N T A R Y N O T E S Ap&lOVfcD FOR ljuBLIC RELEASE: IAW AFR 190-17 FREDRIC...roads into the provincial areas. * Generally the standards of pre-World War I road construction were different from those for modern road work

  4. 25 CFR 170.455 - How are design standards used in IRR projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... conducive to safety, durability, and economy of maintenance; (b) The particular needs of each locality, and...

  5. FHWA road tunnel design guidelines

    DOT National Transportation Integrated Search

    2004-07-01

    This document provides technical criteria and guidance for the planning and design of road tunnels. Specific areas covered include planning, studies and investigations, design, and design of construction, of tunnels and shafts. Performance concepts a...

  6. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  7. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  8. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  9. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  10. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  11. Variability of cement-treated layers in MDOT road projects.

    DOT National Transportation Integrated Search

    2011-12-01

    The Mississippi Department of Transportation revised the specifications for cement-treated : bases between the 1990 and 2004 editions of Mississippi Standard Specifications for Road and Bridge : Construction. The required compressive strength o...

  12. Better road congestion measures are needed

    DOT National Transportation Integrated Search

    2003-05-01

    Road congestion is growing worse as demand : outstrips new roadway construction and other : efforts to increase traffic flows. : Better ways to measure congestion are needed to : effectively address the problem. : Actual measures of speeds an...

  13. 75 FR 1748 - Helena National Forest, Montana, Stonewall Vegetation Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... Scapegoat Swan and Lincoln Gulch). Approximately five miles of road would be built then obliterated immediately following timber removal. Commercial harvest and road construction would not occur in the two...

  14. 25 CFR 170.410 - What is the purpose of tribal long-range transportation planning?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads.... These strategies should address future land use, economic development, traffic demand, public safety...

  15. 25 CFR 170.455 - How are design standards used in IRR projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... conducive to safety, durability, and economy of maintenance; (b) The particular needs of each locality, and...

  16. 20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. GENERAL VIEW OF CONSTRUCTION LOOKING NORTHEAST SHOWING THE CONSTRUCTION BRIDGE, GANTRY CRANE AND STRUCTURAL PIERS. - Wilson Dam & Hydroelectric Plant, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL

  17. Geomagnetism-Aided Indoor Wi-Fi Radio-Map Construction via Smartphone Crowdsourcing.

    PubMed

    Li, Wen; Wei, Dongyan; Lai, Qifeng; Li, Xianghong; Yuan, Hong

    2018-05-08

    Wi-Fi radio-map construction is an important phase in indoor fingerprint localization systems. Traditional methods for Wi-Fi radio-map construction have the problems of being time-consuming and labor-intensive. In this paper, an indoor Wi-Fi radio-map construction method is proposed which utilizes crowdsourcing data contributed by smartphone users. We draw indoor pathway map and construct Wi-Fi radio-map without requiring manual site survey, exact floor layout and extra infrastructure support. The key novelty is that it recognizes road segments from crowdsourcing traces by a cluster based on magnetism sequence similarity and constructs an indoor pathway map with Wi-Fi signal strengths annotated on. Through experiments in real world indoor areas, the method is proved to have good performance on magnetism similarity calculation, road segment clustering and pathway map construction. The Wi-Fi radio maps constructed by crowdsourcing data are validated to provide competitive indoor localization accuracy.

  18. Geomagnetism-Aided Indoor Wi-Fi Radio-Map Construction via Smartphone Crowdsourcing

    PubMed Central

    Li, Wen; Wei, Dongyan; Lai, Qifeng; Li, Xianghong; Yuan, Hong

    2018-01-01

    Wi-Fi radio-map construction is an important phase in indoor fingerprint localization systems. Traditional methods for Wi-Fi radio-map construction have the problems of being time-consuming and labor-intensive. In this paper, an indoor Wi-Fi radio-map construction method is proposed which utilizes crowdsourcing data contributed by smartphone users. We draw indoor pathway map and construct Wi-Fi radio-map without requiring manual site survey, exact floor layout and extra infrastructure support. The key novelty is that it recognizes road segments from crowdsourcing traces by a cluster based on magnetism sequence similarity and constructs an indoor pathway map with Wi-Fi signal strengths annotated on. Through experiments in real world indoor areas, the method is proved to have good performance on magnetism similarity calculation, road segment clustering and pathway map construction. The Wi-Fi radio maps constructed by crowdsourcing data are validated to provide competitive indoor localization accuracy. PMID:29738454

  19. Life cycle assessment of disposal of residues from municipal solid waste incineration: recycling of bottom ash in road construction or landfilling in Denmark evaluated in the ROAD-RES model.

    PubMed

    Birgisdóttir, H; Bhander, G; Hauschild, M Z; Christensen, T H

    2007-01-01

    Two disposal methods for MSWI bottom ash were assessed in a new life cycle assessment (LCA) model for road construction and disposal of residues. The two scenarios evaluated in the model were: (i) landfilling of bottom ash in a coastal landfill in Denmark and (ii) recycling of bottom ash as subbase layer in an asphalted secondary road. The LCA included resource and energy consumption, and emissions associated with upgrading of bottom ash, transport, landfilling processes, incorporation of bottom ash in road, substitution of natural gravel as road construction material and leaching of heavy metals and salts from bottom ash in road as well as in landfill. Environmental impacts associated with emissions to air, fresh surface water, marine surface water, groundwater and soil were aggregated into 12 environmental impact categories: Global Warming, Photochemical Ozone Formation, Nutrient Enrichment, Acidification, Stratospheric Ozone Depletion, Human Toxicity via air/water/soil, Ecotoxicity in water/soil, and a new impact category, Stored Ecotoxicity to water/soil that accounts for the presence of heavy metals and very persistent organic compounds that in the long-term might leach. Leaching of heavy metals and salts from bottom ash was estimated from a series of laboratory leaching tests. For both scenarios, Ecotoxicity(water) was, when evaluated for the first 100 yr, the most important among the twelve impact categories involved in the assessment. Human Toxicity(soil) was also important, especially for the Road scenario. When the long-term leaching of heavy metals from bottom ash was evaluated, based on the total content of heavy metals in bottom ash, all impact categories became negligible compared to the potential Stored Ecotoxicity, which was two orders of magnitudes greater than Ecotoxicity(water). Copper was the constituent that gave the strongest contributions to the ecotoxicities. The most important resources consumed were clay as liner in landfill and the groundwater resource which was potentially spoiled due to leaching of salts from bottom ash in road. The difference in environmental impacts between landfilling and utilization of bottom ash in road was marginal when these alternatives were assessed in a life cycle perspective.

  20. Investigate attractiveness of toll roads.

    DOT National Transportation Integrated Search

    2015-03-01

    HOT facilities are used as a solution for congestion mitigation instead of constructing or expanding the capacity of : existing roadways. Although toll roads modeling has been researched for a long time, High Occupancy Toll (HOT) : modeling is relati...

  1. REPORT ON 2017 MnROAD CONSTRUCTION ACTIVITIES

    DOT National Transportation Integrated Search

    2018-05-01

    The National Road Research Alliance (NRRA), a multi-state pooled-fund program, exists to provide strategic implementation of pavement engineering solutions through cooperative research. NRRA is led by an Executive Committee of state DOT partners, and...

  2. 25 CFR 169.11 - Affidavit and certificate.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of road construction, and a certificate by the State or county engineer or other authorized State or... decimals, the line of route for which the right-of-way application is made. (b) Maps covering roads built...

  3. Roadway sampling evaluation : [summary].

    DOT National Transportation Integrated Search

    2014-09-01

    Asphalt used on Florida roads must meet very : specific standards. Beginning in 1998, the Florida : Department of Transportation (FDOT) moved from : a system in which the department tested asphalt : mixtures for use in road construction to one in : w...

  4. Comparisons of sediment losses from a newly constructed cross-country natural gas pipeline and an existing in-road pipeline

    Treesearch

    Pamela J. Edwards; Bridget M. Harrison; Daniel J. Holz; Karl W.J. Williard; Jon E. Schoonover

    2014-01-01

    Sediment loads were measured for about one year from natural gas pipelines in two studies in north central West Virginia. One study involved a 1-year-old pipeline buried within the bed of a 25-year-old skid road, and the other involved a newly constructed cross-country pipeline. Both pipelines were the same diameter and were installed using similar trenching and...

  5. Erosion and sedimentation control on roads and construction sites in the Federated States of Micronesia

    Treesearch

    Robert R. Ziemer; Walter F. Megahan

    1991-01-01

    Enclosed is the report that Walt Megahan and I prepared following our trip to States of Micronesia. As we discussed earlier, we felt that it was redundant to produce a set of guidelines for road construction since the FAO Conservation Guide 13/5 that was issued in 1989 (ISBN 92-5-102789-X) covers the subject extensively. We felt that we could best tailor this report to...

  6. Implications of climate change on winter road networks in Ontario's Far North and northern Manitoba, Canada, based on climate model projections

    NASA Astrophysics Data System (ADS)

    Hori, Y.; Cheng, V. Y. S.; Gough, W. A.

    2017-12-01

    A network of winter roads in northern Canada connects a number of remote First Nations communities to all-season roads and rails. The extent of the winter road networks depends on the geographic features, socio-economic activities, and the numbers of remote First Nations so that it differs among the provinces. The most extensive winter road networks below the 60th parallel south are located in Ontario and Manitoba, serving 32 and 18 communities respectively. In recent years, a warmer climate has resulted in a shorter winter road season and an increase in unreliable road conditions; thus, limiting access among remote communities. This study focused on examining the future freezing degree-days (FDDs) accumulations during the winter road season at selected locations throughout Ontario's Far North and northern Manitoba using recent climate model projections from the multi-model ensembles of General Circulation Models (GCMs) under the Representative Concentration Pathway (RCP) scenarios. First, the non-parametric Mann-Kendall correlation test and the Theil-Sen method were used to identify any statistically significant trends between FDDs and time for the base period (1981-2010). Second, future climate scenarios are developed for the study areas using statistical downscaling methods. This study also examined the lowest threshold of FDDs during the winter road construction in a future period. Our previous study established the lowest threshold of 380 FDDs, which derived from the relationship between the FDDs and the opening dates of James Bay Winter Road near the Hudson-James Bay coast. Thus, this study applied the threshold measure as a conservative estimate of the minimum threshold of FDDs to examine the effects of climate change on the winter road construction period.

  7. Improving concrete overlay construction.

    DOT National Transportation Integrated Search

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  8. Stabilization of marly soils with portland cement

    NASA Astrophysics Data System (ADS)

    Piskunov, Maksim; Karzin, Evgeny; Lukina, Valentina; Lukinov, Vitaly; Kholkin, Anatolii

    2017-10-01

    Stabilization of marlous soils with Portland cement will increase the service life of motor roads in areas where marl is used as a local road construction material. The result of the conducted research is the conclusion about the principal possibility of stabilization of marlous soils with Portland cement, and about the optimal percentage of the mineral part and the binding agent. When planning the experiment, a simplex-lattice plan was implemented, which makes it possible to obtain a mathematical model for changing the properties of a material in the form of polynomials of incomplete third order. Brands were determined for compressive strength according to GOST 23558-94 and variants of stabilized soils were proposed for road construction.

  9. Simulation of Surface Erosion on a Logging Road in the Jackson Demonstration State Forest

    Treesearch

    Teresa Ish; David Tomberlin

    2007-01-01

    In constructing management models for the control of sediment delivery to streams, we have used a simulation model of road surface erosion known as the Watershed Erosion Prediction Project (WEPP) model, developed by the USDA Forest Service. This model predicts discharge, erosion, and sediment delivery at the road segment level, based on a stochastic climate simulator...

  10. Influence of forest and rangeland management on anadromous fish habitat in Western North America: planning forest roads to protect salmonid habitat.

    Treesearch

    Carlton S. Yee; Terry D. Roelofs

    1980-01-01

    The construction and existence of forest roads, landings, and decking areas may have significant effects on anadromous fish habitat . Major effects discussed in this paper are increased sedimentation from transportation networks, the hindrance to fish migration of drainage structures, and possible changes in water quality from road stabilization additives. Guidelines...

  11. 76 FR 70807 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... (design and construction). Enplane road structural improvements (design and construction). Landside signage improvements (design and construction). Taxiway B-2 extension and taxiway B-1 rehabilitation (design and construction). Elevator and escalator safety code compliance improvements (design and...

  12. Beyond the material grave: Life Cycle Impact Assessment of leaching from secondary materials in road and earth constructions.

    PubMed

    Schwab, Oliver; Bayer, Peter; Juraske, Ronnie; Verones, Francesca; Hellweg, Stefanie

    2014-10-01

    In industrialized countries, large amounts of mineral wastes are produced. They are re-used in various ways, particularly in road and earth constructions, substituting primary resources such as gravel. However, they may also contain pollutants, such as heavy metals, which may be leached to the groundwater. The toxic impacts of these emissions are so far often neglected within Life Cycle Assessments (LCA) of products or waste treatment services and thus, potentially large environmental impacts are currently missed. This study aims at closing this gap by assessing the ecotoxic impacts of heavy metal leaching from industrial mineral wastes in road and earth constructions. The flows of metals such as Sb, As, Pb, Cd, Cr, Cu, Mo, Ni, V and Zn originating from three typical constructions to the environment are quantified, their fate in the environment is assessed and potential ecotoxic effects evaluated. For our reference country, Germany, the industrial wastes that are applied as Granular Secondary Construction Material (GSCM) carry more than 45,000 t of diverse heavy metals per year. Depending on the material quality and construction type applied, up to 150 t of heavy metals may leach to the environment within the first 100 years after construction. Heavy metal retardation in subsoil can potentially reduce the fate to groundwater by up to 100%. One major challenge of integrating leaching from constructions into macro-scale LCA frameworks is the high variability in micro-scale technical and geographical factors, such as material qualities, construction types and soil types. In our work, we consider a broad range of parameter values in the modeling of leaching and fate. This allows distinguishing between the impacts of various road constructions, as well as sites with different soil properties. The findings of this study promote the quantitative consideration of environmental impacts of long-term leaching in Life Cycle Assessment, complementing site-specific risk assessment, for the design of waste management strategies, particularly in the construction sector. Copyright © 2014 Elsevier Ltd. All rights reserved.

  13. Safety impacts of Design Exceptions in Utah

    DOT National Transportation Integrated Search

    2012-06-01

    The objective of this research was to compare safety, measured by expected crash frequency and severity, on road segments where design exceptions were approved and constructed to similar road segments where no design exceptions were approved or const...

  14. Safety Impacts of Design Exceptions in Utah

    DOT National Transportation Integrated Search

    2012-08-01

    The objective of this research was to compare safety, measured by expected crash frequency and severity, on road segments where design exceptions were approved and constructed to similar road segments where no design exceptions were approved or const...

  15. 36 CFR 251.114 - Criteria, terms and conditions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... may be done by arranging for such road to be made part of the local public road system, or formation... route is so located and constructed as to minimize adverse impacts on soils, fish and wildlife, scenic...

  16. 36 CFR 251.114 - Criteria, terms and conditions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... may be done by arranging for such road to be made part of the local public road system, or formation... route is so located and constructed as to minimize adverse impacts on soils, fish and wildlife, scenic...

  17. 36 CFR 251.114 - Criteria, terms and conditions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... may be done by arranging for such road to be made part of the local public road system, or formation... route is so located and constructed as to minimize adverse impacts on soils, fish and wildlife, scenic...

  18. 76 FR 71935 - Humboldt-Toiyabe National Forest, Carson Ranger District, Nevada and California, Bordertown to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... medusahead grass and bull thistle from construction of temporary roads. Ability to reclaim temporary roads... and bulbous blue grass in the area. Potential effects to historic properties, including the National...

  19. Subgrade variability on the Ohio SHRP test road

    DOT National Transportation Integrated Search

    1999-01-01

    This paper documents the extent to which subgrade uniformity was achieved on the Ohio SHRP test road. As construction proceeded, considerably more subgrade undercutting was required than originally anticipated. Much of the undercutting was due to the...

  20. Nuclear gauge application in road industry

    NASA Astrophysics Data System (ADS)

    Azmi Ismail, Mohd

    2017-11-01

    Soil compaction is essential in road construction. The evaluation of the degree of compaction relies on the knowledge of density and moisture of the compacted layers is very important to the performance of the pavement structure. Among the various tests used for making these determinations, the sand replacement density test and the moisture content determination by oven drying are perhaps the most widely used. However, these methods are not only time consuming and need wearisome procedures to obtain the results but also destructive and the number of measurements that can be taken at any time is limited. The test can on be fed back to the construction site the next day. To solve these problems, a nuclear technique has been introduced as a quicker and easier way of measuring the density and moisture of construction materials. Nuclear moisture density gauges have been used for many years in pavement construction as a method of non-destructive density testing The technique which can determine both wet density and moisture content offers an in situ method for construction control at the work site. The simplicity, the speed, and non-destructive nature offer a great advantage for quality control. This paper provides an overview of nuclear gauge application in road construction and presents a case study of monitoring compaction status of in Sedenak - Skudai, Johor rehabilitation projects.

  1. Unofficial Road Building in the Amazon: Socioeconomic and Biophysical Explanations

    NASA Technical Reports Server (NTRS)

    Perz, Stephen G.; Caldas, Marcellus M.; Arima, Eugenio; Walker, Robert J.

    2007-01-01

    Roads have manifold social and environmental impacts, including regional development, social conflicts and habitat fragmentation. 'Road ecology' has emerged as an approach to evaluate the various ecological and hydrological impacts of roads. This article aims to complement road ecology by examining the socio-spatial processes of road building itself. Focusing on the Brazilian Amazon, a heavily-studied context due to forest fragmentation by roads, the authors consider non-state social actors who build 'unofficial roads' for the purpose of gaining access to natural resources to support livelihoods and community development. They examine four case studies of roads with distinct histories in order to explain the socio-spatial processes behind road building in terms of profit maximization, land tenure claims, co-operative and conflictive political ecologies, and constraints as well as opportunities afforded by the biophysical environment. The study cases illustrate the need for a multi-pronged theoretical approach to understanding road building, and call for more attention to the role of non-state actors in unofficial road construction.

  2. Evaluations of in-use emission factors from off-road construction equipment

    NASA Astrophysics Data System (ADS)

    Cao, Tanfeng; Durbin, Thomas D.; Russell, Robert L.; Cocker, David R.; Scora, George; Maldonado, Hector; Johnson, Kent C.

    2016-12-01

    Gaseous and particle emissions from construction engines contribute an important fraction of the total air pollutants released into the atmosphere and are gaining increasing regulatory attention. Robust quantification of nitrogen oxides (NOx) and particulate matter (PM) emissions are necessary to inventory the contribution of construction equipment to atmospheric loadings. Theses emission inventories require emissions factors from construction equipment as a function of equipment type and modes of operation. While the development of portable emissions measurement systems (PEMS) has led to increased studies of construction equipment emissions, emissions data are still much more limited than for on-road vehicles. The goal of this research program was to obtain accurate in-use emissions data from a test fleet of newer construction equipment (model year 2002 or later) using a Code of Federal Requirements (CFR) compliant PEMS system. In-use emission measurements were made from twenty-seven pieces of construction equipment, which included four backhoes, six wheel loaders, four excavators, two scrapers (one with two engines), six bulldozers, and four graders. The engines ranged in model year from 2003 to 2012, in rated horsepower (hp) from 92 to 540 hp, and in hours of operation from 24 to 17,149 h. This is the largest study of off-road equipment emissions using 40 CFR part 1065 compliant PEMS equipment for all regulated gaseous and particulate emissions.

  3. Assessment of dynamic surface leaching of monolithic surface road materials.

    PubMed

    Paulus, Hélène; Schick, Joachim; Poirier, Jean-Eric

    2016-07-01

    Construction materials have to satisfy, among others, health and environment requirements. To check the environmental compatibility of road construction materials, release of hazardous substances into water must be assessed. Literature mostly describes the leaching behaviour of recycled aggregates for potential use in base or sub-base layers of roads. But little is known about the release of soluble substances by materials mixed with binders and compacted for intended use on road surface. In the present study, we thus performed a diffusion test with sequential renewal of water during a 64 day period according to CEN/TS 16637-2 specifications, on asphalt concretes and hydraulically bound monoliths, two common surface road materials. It is shown that release of dangerous substances is limited in these hydrodynamic conditions. It was particularly true for asphalt concrete leachates where no metallic trace element, sulphate, chloride or fluoride ion could be quantified. This is because of the low hydraulic conductivity and the low polarity of the petroleum hydrocarbon binder of these specimens. For hydraulically bound materials around 20,000 mg/m(2) of sulphate diffused from the monoliths. It is one order of magnitude higher than chloride diffusion and two orders of magnitude higher than fluoride release. No metallic trace element, except small quantities of copper in the last eluate could be quantified. No adverse effect is to be expected for human and environmental health from the leachates of these compacted surface road construction materials, because all the measured parameters were below EU (Council Directive 98/83/EC) or WHO guidelines for drinking water standards. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. 75 FR 13299 - Lower Colorado River Authority Transmission Services Corporation; Construction, Operation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...] Lower Colorado River Authority Transmission Services Corporation; Construction, Operation, Maintenance... activities associated with LCRA TSC's construction, maintenance, operation, and repair of four Competitive..., substation upgrades, and access roads) required to be constructed by the Public Utility Commission of Texas...

  5. 23 CFR 633.209 - Notices to prospective Federal-aid construction contractors.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Development System and Appalachian local access roads construction contracts. ... 23 Highways 1 2010-04-01 2010-04-01 false Notices to prospective Federal-aid construction...) § 633.209 Notices to prospective Federal-aid construction contractors. The State highway department...

  6. The study of KBP of road construction workers of highway AIDS prevention project before and after intervention.

    PubMed

    Liu, Dan; Dong, Si-Ping; Gao, Guang-Ming; Fan, Ming-Yu; Zhang, Zong-Jiu; Fang, Peng-Qian

    2013-10-01

    To get scientific basis for further health education through the research of the road construction workers' KBP before and after the interventions of highway AIDS prevention project. Multi-stage random sampling method was employeed to select workers of 8 sites from 14 sites along highway to investigate their AIDS knowledge, belief and performance (KBP) before and after highway AIDS prevention project. Over 90% of the investigated workers had ever heard about AIDS, and the non-skilled workers of lower educational level improved more after intervention. The correct answer rate of the three transmitting ways of AIDS of drivers which is the focused group of highway before and after intervention had the obvious statistical significance (P<0.05), and the other group's correct answer rates also had improved after intervention. Most people's understanding of preventing AIDS through correct use of condoms when having sex had a statistically significant difference(P<0.05) after prevention. The rates of using condoms of foremen and skilled workers when having sex with commercial sex worker/casual partner increased after intervention. The health education of HIV among the road construction workers is effective and further health education of HIV prevention should be carried out among the road construction workers to improve their knowledge and awareness of avoiding the high-risk behaviors. Copyright © 2013 Hainan Medical College. Published by Elsevier B.V. All rights reserved.

  7. Concrete debris assessment for road construction activities : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Two distinct but related issues of importance to FDOT were investigated: (1) the possible impact of : recycled concrete aggregate (RCA) used as road base on the subsurface environment and (2) the : management of concrete grinding residuals (CGR) resu...

  8. Estimation of annual average daily traffic for off-system roads in Florida

    DOT National Transportation Integrated Search

    1999-07-28

    Estimation of Annual Average Daily Traffic (AADT) is extremely important in traffic planning and operations for the state departments of transportation (DOTs), because AADT provides information for the planning of new road construction, determination...

  9. 40 CFR 122.27 - Silvicultural activities (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., prescribed burning, pest and fire control, harvesting operations, surface drainage, or road construction and... roads) may involve point source discharges of dredged or fill material which may require a CWA section...

  10. Suspended sediment and turbidity after road construction/improvement and forest harvest in streams of the Trask River Watershed Study, Oregon

    Treesearch

    Ivan Arismendi; Jeremiah D. Groom; Maryanne Reiter; Sherri L. Johnson; Liz Dent; Mark Meleason; Alba Argerich; Arne E. Skaugset

    2017-01-01

    Transport of fine-grained sediment from unpaved forest roads into streams is a concern due to the potential negative effects of additional suspended sediment on aquatic ecosystems. Here we compared turbidity and suspended sediment concentration (SSC) dynamics in five nonfish bearing coastal Oregon streams above and below road crossings, during three consecutive time...

  11. Going-to-the-Sun Road: A Model of Landscape Engineering. Teaching with Historic Places.

    ERIC Educational Resources Information Center

    Metcalf, Fay

    Soaring mountain peaks, glaciers, deep-blue lakes, and lush forests delight the senses of visitors who drive on Going-to-the-Sun Road through Glacier National Park in northwestern Montana. The construction of the Going-to-the-Sun-Road, dedicated in 1933, made this experience available to the many visitors who come to the park by car. Building this…

  12. A decision algorithm for determining safe clearing limits for the construction of skid roads

    Treesearch

    Chris LeDoux

    2006-01-01

    The majority of the timber harvested in the United States is extracted by ground-based skidders and crawler/dozer systems. Ground-based systems generally require a primary transportation network (a network of skid trails/roads) throughout the area being harvested. Logs are skidded or dragged along these skid roads/trails as they are transported from where they were cut...

  13. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands ormore » rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected environment; (2) Rare plants and vegetation assemblages; (3) Rare wildlife and their habitat; (4) Rare aquatic species; and (5) Wetlands/Floodplains. A summary of project actions taken or planned in order to avoid, minimize, or mitigate the environmental impacts associated with this project are summarized in the conclusion section of this report.« less

  14. A review of models relevant to road safety.

    PubMed

    Hughes, B P; Newstead, S; Anund, A; Shu, C C; Falkmer, T

    2015-01-01

    It is estimated that more than 1.2 million people die worldwide as a result of road traffic crashes and some 50 million are injured per annum. At present some Western countries' road safety strategies and countermeasures claim to have developed into 'Safe Systems' models to address the effects of road related crashes. Well-constructed models encourage effective strategies to improve road safety. This review aimed to identify and summarise concise descriptions, or 'models' of safety. The review covers information from a wide variety of fields and contexts including transport, occupational safety, food industry, education, construction and health. The information from 2620 candidate references were selected and summarised in 121 examples of different types of model and contents. The language of safety models and systems was found to be inconsistent. Each model provided additional information regarding style, purpose, complexity and diversity. In total, seven types of models were identified. The categorisation of models was done on a high level with a variation of details in each group and without a complete, simple and rational description. The models identified in this review are likely to be adaptable to road safety and some of them have previously been used. None of systems theory, safety management systems, the risk management approach, or safety culture was commonly or thoroughly applied to road safety. It is concluded that these approaches have the potential to reduce road trauma. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. 47. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING NORTH AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING NORTH AT THE AUTOCLAVE BUILDING UNDER CONSTRUCTION, APRIL 23, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  16. Geotextiles in Flexible Pavement Construction

    ERIC Educational Resources Information Center

    Alungbe, Gabriel D.

    2004-01-01

    People everywhere in the developed world regularly drive on paved roads. Learning about the construction techniques and materials used in paving benefits technology and construction students. This article discusses the use of geosynthetic textiles in pavement construction. It presents background on pavements and describes geotextiles and drainage…

  17. Use of Barriers in Rural Open Road Conditions--A Synthesis Study

    DOT National Transportation Integrated Search

    2012-05-01

    The use of wide medians and clear zones that do not require median and roadside barriers is the current design practice for new and : reconstructed rural highway facilities. Constructing or reconstructing roads with fullwidth medians and clear zon...

  18. Use of Barriers in Rural Open Road Condition--A Synthesis Study

    DOT National Transportation Integrated Search

    2012-05-01

    The use of wide medians and clear zones that do not require median and roadside barriers is the current design practice for new and : reconstructed rural highway facilities. Constructing or reconstructing roads with fullwidth medians and clear zon...

  19. Report of concrete pavement evaluation : project 105 C-4181-01 Donahoo Road, Wyandotte County.

    DOT National Transportation Integrated Search

    2013-12-01

    The physical properties of hardened concrete cores and fresh concrete test results were compared with aggregate : gradation workability differences. The concrete cores were taken from a rural two-lane concrete road in northeastern Kansas : constructe...

  20. Methods to expedite and streamline utility relocations for road projects.

    DOT National Transportation Integrated Search

    2014-12-01

    This report describes best practices and tools to streamline and expedite utility relocations when they : are required as part of road construction projects. As part of this effort, a research team from the : Kentucky Transportation Center (KTC) cond...

  1. 10. FIRST FLOOR, ENTRY HALL, LOOKING SOUTHWEST TOWARDS FRONT ENTRY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. FIRST FLOOR, ENTRY HALL, LOOKING SOUTHWEST TOWARDS FRONT ENTRY WITH DOOR PARTIALLY CLOSED TO SHOWS ITS RAISED PANEL CONSTRUCTION AND STRAP HINGES - Open Gate Farm, House, Ridge Road, 1 mile East of Elephant Road, Perkasie, Bucks County, PA

  2. Road screening and distribution route multi-objective robust optimization for hazardous materials based on neural network and genetic algorithm.

    PubMed

    Ma, Changxi; Hao, Wei; Pan, Fuquan; Xiang, Wang

    2018-01-01

    Route optimization of hazardous materials transportation is one of the basic steps in ensuring the safety of hazardous materials transportation. The optimization scheme may be a security risk if road screening is not completed before the distribution route is optimized. For road screening issues of hazardous materials transportation, a road screening algorithm of hazardous materials transportation is built based on genetic algorithm and Levenberg-Marquardt neural network (GA-LM-NN) by analyzing 15 attributes data of each road network section. A multi-objective robust optimization model with adjustable robustness is constructed for the hazardous materials transportation problem of single distribution center to minimize transportation risk and time. A multi-objective genetic algorithm is designed to solve the problem according to the characteristics of the model. The algorithm uses an improved strategy to complete the selection operation, applies partial matching cross shift and single ortho swap methods to complete the crossover and mutation operation, and employs an exclusive method to construct Pareto optimal solutions. Studies show that the sets of hazardous materials transportation road can be found quickly through the proposed road screening algorithm based on GA-LM-NN, whereas the distribution route Pareto solutions with different levels of robustness can be found rapidly through the proposed multi-objective robust optimization model and algorithm.

  3. Rumblings and Rainfall, Rebels, Remittances and Roads- The complex landscape of slope failure in Nepal

    NASA Astrophysics Data System (ADS)

    McAdoo, Brian G.; Sudmeier, Karen; Devkota, Sanjaya

    2017-04-01

    During the first monsoon season following the deadly 2015 Gorkha earthquake, 27 people were killed during two events in Nepal's Western Region due to debris flows triggered by a 24-hour, 315 mm cloudburst (Devkota et al. 2015). Both events were linked with roads: the first was caused by an accumulation of water on a newly constructed road above a steep, deforested slope, the second wiped out a major road and destroyed 10 houses. These deadly landslides were not triggered solely by extreme rainfall, but rather a complex combination of earthquakes, intensified rainfall associated with climate change and an explosion of unplanned rural road construction fueled by an increase in foreign investment, remittances and decentralisation of budgets and power from the central government to local villages. This complexity is explored through a trend data analysis on the number of landslides, landslide fatalities, rainfall intensity, and the road network in Nepal between 1980-2014 (McAdoo et al, submitted). Of most concern are the poorly constructed roads in Nepal's Middle Hill districts ( 1000-3000 m above sea level, humid, subtropical) as they are proliferating at an unprecedented pace without proper alignment, drainage, grading or maintenance. They are occurring in areas which frequently receive up to 4,000-5,000 mm of precipitation per year, causing considerable loss in lives, livelihoods and investment. Landslide fatalities increased from 88 on average for the period 1982-1995 to 130 deaths per year for the period 2007-2014 (Desinventar, 2016). Contrary to numerous studies which show a strong link between rainfall and landslides, our trend analysis demonstrates a decoupling of climate and the geomorphic drivers, pointing to other factors, namely the exponential road construction trend to explain the increase in landslide fatalities. Nepal has some of the oldest manuals and well-trained cadres in low-cost green engineering practices, yet these are rarely applied. To reverse this deadly road-landslide trend, planners and policy-makers need to reconsider how to promote the country's infrastructure development, a central element to Nepal's sustainable development trajectory without causing further unnecessary human losses. References Desinventar (2016) Disaster information management system, Profile - Nepal http://www.desinventar.net/DesInventar/profiletab.jsp?countrycode=npl Accessed December 13, 2016 Devkota, S. Shakya, N.M., Sudmeier-Rieux, K., Adhikari, A. and M. Jaboyedoff (2016). Spatial trends of precipitation and extreme weather events in central-western hills of Nepal. (Conference Paper) 7th National conference of Science and Technology, Kathmandu, Nepal (March 29-31 2016) McAdoo, B.G, Sudmeier-Rieux, K. and S. Devkota (submitted) Roads in Nepal - Vehicles for Development or Disaster?

  4. 1857 PatentExtant Construction Comparison Powerscourt Bridge, Spanning Chateauguay River, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1857 Patent-Extant Construction Comparison - Powerscourt Bridge, Spanning Chateauguay River, First Concession Road, Elgin/Hichinbrooke, Huntingdon County, Quebec, Canada, Chateaugay, Franklin County, NY

  5. Inbreeding and road effect zone in a Ranidae: the case of Agile frog, Rana dalmatina Bonaparte, 1840.

    PubMed

    Lesbarrères, David; Pagano, Alain; Lodé, Thierry

    2003-08-01

    Inbreeding has often been invoked in the extinction of local populations. In eleven western France populations of Agile frog studied, observed heterozygosity was significantly lower than expected in all cases, giving new evidence of such a depression in small populations. It especially occurred in ponds located near an highway rather than in undisturbed populations (FIS = 0.544 and 0.315, respectively). Thus, our results argue for a "road effect zone". Discussing about road distance and conservation policies, we propose that roads are directly involved in inbreeding and in local extinction. Thus, road construction ought to consider conservation management.

  6. A synthesis study on collecting, managing, and sharing road construction asset data.

    DOT National Transportation Integrated Search

    2015-09-01

    Accurate and complete construction records and asbuilt data are the key prerequisites to the effective management of transportation : infrastructure assets throughout their life cycle. The construction phase is the best time to collect such data. ...

  7. Development of a geotechnical information database : technical summary report.

    DOT National Transportation Integrated Search

    2009-08-01

    The knowledge of existing soil conditions prior to road and bridge construction can : reduce construction cost, time, and headaches. The field data and laboratory results : collected far in advance of project construction are often slow to reach the ...

  8. 41 CFR 102-75.895 - What wording must generally be in the excess profits clause that is required in the offer to...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... serve only the property, including road construction, storm and sanitary sewer construction, other public facilities or utility construction, building rehabilitation and demolition, landscaping, grading...

  9. Visual warning system for worker safety on roadside work-zones.

    DOT National Transportation Integrated Search

    2016-08-01

    Growing traffic on US roadways and heavy construction machinery on road construction sites pose a critical safety : threat to construction workers. This report summarizes the design and development of a worker safety system using : Dedicated Short Ra...

  10. Environmental Assessment for a Taxiway M Bypass Road at Travis Air Force Base, California

    DTIC Science & Technology

    2011-10-01

    California Species Scientific Name Species Common Name Protection Status Presence Plants Astragalus tener var. tener Alkali milk -vetch CNPS 1B...Downingia pusilla Dwarf downingia CNPS 2.2 Potential Astragalus tener var. ferrisiae Ferris’ milk -vetch CNPS 1B.1 Potential Fritillaria liliacea...Bypass Road and C Bunker Access Road improvements. Use of raw building materials for construction would be an irretrievable commitment of

  11. Ground temperatures across the old and new roads at mile 130, Richardson highway during 1954-62

    USGS Publications Warehouse

    Jin, H.; Brewer, M.C.; Perkins, R.A.; ,

    2002-01-01

    Year-round studies of the geothermal impacts of road construction in a "warm" permafrost area were undertaken during 1954-1962 at six road sections across the Richardson and Glenn Highways, in the vicinity of Glennallen, Alaska. As a result, significant information was obtained regarding the temperatures, and changes in temperatures, in the permafrost beneath and adjacent to the highway sections.

  12. Exploring Measures to Control Road Traffic Injuries in Iran: Key Informants Points of View.

    PubMed

    Salari, Hedayat; Motevalian, Seyed Abbas; Arab, Mohammad; Esfandiari, Atefeh; Akbari Sari, Ali

    2017-05-01

    Injuries and fatalities from road traffic Injuries are global public health concerns, and a major problem in the Iran. This study aimed to explore strategies to control road traffic Injuries (RTI) in Iran. We conducted a qualitative study to explore possible ways to reduce the occurrence of road traffic Injuries in Iran in 2016. Interviewees were purposively sampled from various sectors due to multidisciplinary nature of RTIs. Participants were mainly representatives from the police, Ministry of Road, Municipal, emergency services and Ministry of Health. Besides, public health authorities, researchers, and university professors were interviewed. We conducted in-depth interviews using generic guides. Data was analyzed using MAXQDA 10 software. Through content analysis, we interpreted core themes relevant to the accomplishment of our study objectives. Themes that emerged from our study include; road traffic management, governance, education, improving accident database, enforcement, driving license restrictions, and construction of pedestrian overpass. This study revealed key informants' views regarding available and affordable solutions to reduce RTIs in Iran. Many applicable strategies are identified in the control of RTIs in Iran. Although some solutions such as highway construction and/or expanding rail transportation have been suggested as effective measures for reducing accident, but they are costly and may not be fully applied in developing countries like Iran.

  13. 75 FR 17829 - Motorcyclist Advisory Council to the Federal Highway Administration

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... FHWA, on infrastructure issues of concern to motorcyclists, including: (1) Barrier design; (2) road design, construction, and maintenance practices; and (3) the architecture and implementation of... Administrator on infrastructure issues of concern to motorcyclists, including-- (1) Barrier design; (2) Road...

  14. 77 FR 26785 - Implementation of Indian Reservation Roads Program and Streamlining the Federal Delivery of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... does not currently exist and needs to be constructed.'' A primary access route is the shortest feasible... Introductions 9:15 a.m.-10:45 a.m. Proposed/Access Roads (Recommendation, Expectations, Implementation) 10:45 a...

  15. Evaluating the use of waste-to-energy bottom ash as road construction materials : [summary].

    DOT National Transportation Integrated Search

    2014-02-01

    Municipal solid waste incineration (MSWI) generates millions of tons of ash each year. In European and Asian countries, this ash has been recycled into road beds, asphalt paving, and concrete products encouraged and enforced by standards, managem...

  16. 40 CFR 49.123 - General provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., road construction and road maintenance, fertilization, logging operations, and forest management... oil. Fugitive dust means a particulate matter emission made airborne by forces of wind, mechanical... § 49.123(a). (vii) ASTM D2880-03, Standard Specification for Gas Turbine Fuel Oils, IBR approved for...

  17. 40 CFR 49.123 - General provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., road construction and road maintenance, fertilization, logging operations, and forest management... oil. Fugitive dust means a particulate matter emission made airborne by forces of wind, mechanical... § 49.123(a). (vii) ASTM D2880-03, Standard Specification for Gas Turbine Fuel Oils, IBR approved for...

  18. 40 CFR 49.123 - General provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., road construction and road maintenance, fertilization, logging operations, and forest management... oil. Fugitive dust means a particulate matter emission made airborne by forces of wind, mechanical... § 49.123(a). (vii) ASTM D2880-03, Standard Specification for Gas Turbine Fuel Oils, IBR approved for...

  19. 40 CFR 49.123 - General provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., road construction and road maintenance, fertilization, logging operations, and forest management... oil. Fugitive dust means a particulate matter emission made airborne by forces of wind, mechanical... § 49.123(a). (vii) ASTM D2880-03, Standard Specification for Gas Turbine Fuel Oils, IBR approved for...

  20. Pi'ilani Highway side on south side of island, Manawainui Bridge, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Pi'ilani Highway side on south side of island, Manawainui Bridge, constructed in 1993 to modern ASHTO standards; note difference in scale with historic Hana Belt Road bridges - Hana Belt Road, Between Haiku and Kaipahulu, Hana, Maui County, HI

  1. 76 FR 35398 - Scoria Mining Addition, Medicine Bow-Routt National Forests and Thunder Basin National Grassland...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... material is available for road construction and maintenance in order to support required maintenance and... 20 acres in any given year, for the purpose of using that scoria on adjacent roads needed for coal...

  2. Evaluating the benefits of geogrid reinforced bases in flexible pavement : technical summary report.

    DOT National Transportation Integrated Search

    2009-09-01

    The inadequacy of many existing roads due to rapid growth in traffic volume provides a motivation for exploring alternatives to existing methods of constructing and rehabilitating roads. The use of geosynthetics to stabilize and reinforce paved and u...

  3. Temporary traffic control and enforcement of traffic laws in closed road sections.

    DOT National Transportation Integrated Search

    2007-06-01

    "Public travel by motor vehicles is often necessary in road and street sections that have been officially closed for construction, repair, and/or other reasons. This authorization is permitted in order to provide access to homes and businesses locate...

  4. Noise Costs from Road Transport

    NASA Astrophysics Data System (ADS)

    Margorínová, Martina; Trojanová, Mária; Decký, Martin; Remišová, Eva

    2018-06-01

    Building and improving road infrastructure in Slovakia is currently influenced by the amount of state funding. Therefore, it is necessary to determine the effectiveness of each proposed solution of road project, which is based on life-cycle costs. Besides capital costs, social costs are also important, which valued the negative impacts due to road construction and operation on road users, the environment, and the population living in the affected area. Some components of social costs have shortcomings in quantifying and valuating, which need to be resolved. The one of important components which affects human health and the value of an area, and have some shortcomings are noise costs. Improvement of this component will lead to more accurate valuation of economic efficiency of roads.

  5. Monitoring the petroleum bitumen characteristics changes during their interaction with the polymers

    NASA Astrophysics Data System (ADS)

    Belyaev, P. S.; Mishchenko, S. V.; Belyaev, V. P.; Frolov, V. A.

    2017-08-01

    The subject of the study is the characteristics (penetration, softening temperature, ductility and elasticity) of a road binder based on petroleum bitumen. The work purpose is to monitor the changes in the characteristics of petroleum bitumen when it interacting with polymers: thermoplastic elastomer, low-density polyethylene, including the adhesive additive presence. To carry out the research a special laboratory facility was designed and manufactured with two blade mixers providing intensive turbulent mixing and the possibility to effect on the transition process of combining the components in a polymer-bitumen binder. To construct a mathematical model of the polymer-bitumen binder characteristics dependence from the composition, methods of statistical experiments planning were used. The possibility of the expensive thermoplastic elastomers replacement with polyethylene is established while maintaining acceptable polymer-bitumen binder quality parameters. The obtained results are proposed for use in road construction. They allow to reduce the roads construction cost with solving the problem of recycling long-term waste packaging from polyethylene.

  6. Beyond the material grave: Life Cycle Impact Assessment of leaching from secondary materials in road and earth constructions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwab, Oliver; Karlsruhe Institute of Technology, Institute for Geography and Geoecology, Adenauerring 20, 76131 Karlsruhe; Bayer, Peter, E-mail: bayer@erdw.ethz.ch

    Highlights: • We model environmental impacts of leaching from secondary construction material. • Industrial wastes in construction contain up to 45,000 t heavy metals per year (D). • In a scenario, 150 t are leached to the environment within 100 years after construction. • All heavy metals but As, Sb and Mo are adsorbed by 20 cm subsoil in this scenario. • Environmental impacts depend on material, pollutant, construction type, and geography. - Abstract: In industrialized countries, large amounts of mineral wastes are produced. They are re-used in various ways, particularly in road and earth constructions, substituting primary resources suchmore » as gravel. However, they may also contain pollutants, such as heavy metals, which may be leached to the groundwater. The toxic impacts of these emissions are so far often neglected within Life Cycle Assessments (LCA) of products or waste treatment services and thus, potentially large environmental impacts are currently missed. This study aims at closing this gap by assessing the ecotoxic impacts of heavy metal leaching from industrial mineral wastes in road and earth constructions. The flows of metals such as Sb, As, Pb, Cd, Cr, Cu, Mo, Ni, V and Zn originating from three typical constructions to the environment are quantified, their fate in the environment is assessed and potential ecotoxic effects evaluated. For our reference country, Germany, the industrial wastes that are applied as Granular Secondary Construction Material (GSCM) carry more than 45,000 t of diverse heavy metals per year. Depending on the material quality and construction type applied, up to 150 t of heavy metals may leach to the environment within the first 100 years after construction. Heavy metal retardation in subsoil can potentially reduce the fate to groundwater by up to 100%. One major challenge of integrating leaching from constructions into macro-scale LCA frameworks is the high variability in micro-scale technical and geographical factors, such as material qualities, construction types and soil types. In our work, we consider a broad range of parameter values in the modeling of leaching and fate. This allows distinguishing between the impacts of various road constructions, as well as sites with different soil properties. The findings of this study promote the quantitative consideration of environmental impacts of long-term leaching in Life Cycle Assessment, complementing site-specific risk assessment, for the design of waste management strategies, particularly in the construction sector.« less

  7. 46. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING N.E. AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING N.E. AT THE LIME-NITROGEN MILL ROOM UNDER CONSTRUCTION, APRIL 23, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  8. 44. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING S.E. AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING S.E. AT THE LIME-NITROGEN OVEN ROOM UNDER CONSTRUCTION, APRIL 23, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  9. 48. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING N.E. AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING N.E. AT THE AMMONIUM NITRATE BUILDING UNDER CONSTRUCTION, AUGUST 24, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  10. 45. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING N.E. AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. U.S. NITRATE PLANT UNDER CONSTRUCTION, VIEW LOOKING N.E. AT THE LIME-NITROGEN OVEN ROOM UNDER CONSTRUCTION, APRIL 23, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  11. Literature review of methods to determine road user costs in construction zones

    DOT National Transportation Integrated Search

    1997-01-01

    As freeway construction increases with the need to expand, repair and maintain the existing infrastructure, the desire to quantify the inconvenience or delay costs to the user of the freeway undergoing construction has increased and become neccessary...

  12. Predicting the effectiveness of road safety campaigns through alternative research designs.

    PubMed

    Adamos, Giannis; Nathanail, Eftihia

    2016-12-01

    A large number of road safety communication campaigns have been designed and implemented in the recent years; however their explicit impact on driving behavior and road accident rates has been estimated in a rather low proportion. Based on the findings of the evaluation of three road safety communication campaigns addressing the issues of drinking and driving, seat belt usage, and driving fatigue, this paper applies different types of research designs (i.e., experimental, quasi-experimental, and non-experimental designs), when estimating the effectiveness of road safety campaigns, implements a cross-design assessment, and conducts a cross-campaign evaluation. An integrated evaluation plan was developed, taking into account the structure of evaluation questions, the definition of measurable variables, the separation of the target audience into intervention (exposed to the campaign) and control (not exposed to the campaign) groups, the selection of alternative research designs, and the appropriate data collection methods and techniques. Evaluating the implementation of different research designs in estimating the effectiveness of road safety campaigns, results showed that the separate pre-post samples design demonstrated better predictability than other designs, especially in data obtained from the intervention group after the realization of the campaign. The more constructs that were added to the independent variables, the higher the values of the predictability were. The construct that most affects behavior is intention, whereas the rest of the constructs have a lower impact on behavior. This is particularly significant in the Health Belief Model (HBM). On the other hand, behavioral beliefs, normative beliefs, and descriptive norms, are significant parameters for predicting intention according to the Theory of Planned Behavior (TPB). The theoretical and applied implications of alternative research designs and their applicability in the evaluation of road safety campaigns are provided by this study. Copyright © 2016 Elsevier Ltd and National Safety Council. All rights reserved.

  13. Leaching behavior of coal combustion products and the environmental implication in road construction

    DOT National Transportation Integrated Search

    2008-02-01

    The use of coal fly ash in road base and sub-base applications can provide better properties and performance, and is superior to it being otherwise disposed and becoming a possible environmental liability. Understanding the metal leaching behavior fo...

  14. 19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS CONSTRUCTED ON NEWFOUND GAP ROAD TO REPLACE A SERIES OF DANGEROUS SWITCHBACKS. THIS ENGINEERING FEATURE QUICKLY BECAME A POPULAR TOURIST ATTRACTION. - Great Smoky Mountains National Park Roads & Bridges, Gatlinburg, Sevier County, TN

  15. 25 CFR 170.442 - What is the IRR Inventory?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Irr Inventory..., maintenance responsibility, and ownership. (b) Elements of the inventory are used in the Relative Need...

  16. Optimizing pavement base, subbase, and subgrade layers for cost and performance of local roads : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-12-01

    It is common for local street and road pavements to be constructed using : portland cement concrete (PCC) directly supported on natural subgrade : without considering subgrade treatment or structural support layers such : as granular subbase. In orde...

  17. The effect of regulatory requirements and intervening groups on road construction in South Carolina.

    DOT National Transportation Integrated Search

    2017-06-09

    The primary objective of this study was to assess the impact of temporal delays to SCDOT road projects caused by legal : challenges brought by individuals and external entities with environmental-based concerns. Specifically, the focus was to : asses...

  18. Report of concrete pavement evaluation : project 105 C-4181-01 Donahoo Road, Wyandotte County : [technical summary].

    DOT National Transportation Integrated Search

    2013-12-01

    The physical properties of hardened concrete cores and fresh concrete test results were compared with aggregate gradation workability differences. The concrete cores were taken from a rural two-lane concrete road in northeastern Kansas constructed in...

  19. 25 CFR 170.460 - What must a project package include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....460 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Review... environmental, archeological, and cultural clearances; and (4) Identification of design exceptions if used in...

  20. 36 CFR 294.46 - Other activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... any Forest Service authorization required for road construction, road reconstruction, tree cutting, or... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Other activities. 294.46 Section 294.46 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SPECIAL AREAS...

  1. 36 CFR 294.46 - Other activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... any Forest Service authorization required for road construction, road reconstruction, tree cutting, or... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Other activities. 294.46 Section 294.46 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE SPECIAL AREAS...

  2. Road to Nowhere: The Barton By-Pass Campaign.

    ERIC Educational Resources Information Center

    Bryant, Richard

    1997-01-01

    Describes the organization of a successful community protest against road construction in an Oxford (England) neighborhood and identifies success factors: coalitions with other interest groups; intensive, sustained lobbying; investment in public meetings, exhibitions, and demonstrations; use of local and national media; and involvement of…

  3. 76 FR 30957 - Endangered and Threatened Wildlife and Plants; Notice of Availability of a Draft Recovery Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... habitat due to development, road construction, and forest fire; and competition with the introduced Abert.... Royal Palm Road, Suite 103, Phoenix, AZ 85021-4951 (602-242-0210, phone). If you wish to comment on the...

  4. Elkmont Vehicle Bridge, Construction PeelAway Great Smoky Mountains National ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Elkmont Vehicle Bridge, Construction Peel-Away - Great Smoky Mountains National Park Roads & Bridges, Elkmont Vehicle Bridge, Spanning Little River at Elkmont Campground, Gatlinburg, Sevier County, TN

  5. 3D-FEM Analysis on Geogrid Reinforced Flexible Pavement Roads

    NASA Astrophysics Data System (ADS)

    Calvarano, Lidia Sarah; Palamara, Rocco; Leonardi, Giovanni; Moraci, Nicola

    2017-12-01

    Nowadays, the need to increase pavement service life, guarantee high performance, reduce service and maintenance costs has been turned a greater attention on the use of reinforcements. This paper presents findings of a numerical investigation on geogrid reinforced flexible pavement roads, under wheel traffic loads, using a three-dimensional Finite Element Method (FEM). The results obtained show the effectiveness of glass fibre grids as reinforcement which, with appropriate design and correct installation, by improving interface shear resistance, can be used to expand the performance of flexible pavements in different ways: by increasing the road service life providing a relevant contribution against superficial rutting or by decreasing the construction costs due to the reduction in the reinforced HMA layer thickness and thus of mineral aggregate required for its construction.

  6. [Effects of road construction on regional vegetation types].

    PubMed

    Liu, Shi-Liang; Liu, Qi; Wang, Cong; Yang, Jue-Jie; Deng, Li

    2013-05-01

    As a regional artificial disturbance component, road exerts great effects on vegetation types, and plays a substantial role in defining vegetation distribution to a certain extent. Aiming at the tropical rainforest degradation and artificial forest expansion in Yunnan Province of Southwest China, this paper analyzed the effects of road network extension on regional vegetation types. In the Province, different classes of roads had different effects on the vegetation types, but no obvious regularity was observed in the effects on the patch areas of different vegetation types due to the great variations of road length and affected distance. However, the vegetation patch number was more affected by lower class roads because of their wide distribution. As for different vegetation types, the vegetations on cultivated land were most affected by roads, followed by Castanopsis hystrix and Schima wallichii forests. Road network formation contributed most to the vegetation fragmentation, and there existed significant correlations between the human disturbance factors including village- and road distributions.

  7. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  8. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  9. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  10. 36 CFR 212.10 - Maximum economy National Forest System roads.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Maximum economy National... economy National Forest System roads. The Chief may acquire, construct, reconstruct, improve, and maintain... Forest Service in locations and according to specifications which will permit maximum economy in...

  11. Leaching behavior of coal combustion products and the environmental implication in road construction : project progress report.

    DOT National Transportation Integrated Search

    2009-01-01

    The use of coal fly ash in road base and sub-base applications can provide better properties and performance, and is superior to it being otherwise disposed and becoming a possible environmental liability. Understanding the metal leaching behavior fo...

  12. 75 FR 82075 - Notice of Quarterly Report (July 1, 2010-September 30, 2010)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Project. transportation to annual daily traffic)-- increase tourism Efate: Ring Road. and business Traffic... tourism pottery workshops. and artisan Construction and sectors. rehabilitation of Fez Medina Sites... through investments in the road network. Rural Land Governance Project.... $59,934,615 Increase investment...

  13. 25 CFR 170.474 - Who conducts the project closeout?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who conducts the project closeout? 170.474 Section 170.474 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  14. Field Performance of Timber Bridges. 16: North Siwell Road Stress-Laminated Bridge

    DOT National Transportation Integrated Search

    1998-03-01

    This report is 16th in a series of reports that documents the : field performance of timber bridges. The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single span, stress laminated T-beam ...

  15. 6. VIEW OF GDOT BRIDGE NO. 02700268X00678N BRIDGE PLATE IDENTIFYING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF GDOT BRIDGE NO. 027-00268X-00678N BRIDGE PLATE IDENTIFYING COUNTY COMMISSIONERS AT THE TIME OF CONSTRUCTION. - GDOT Bridge No. 027-00268X-00678N, County Road 268-Empress Road span Piscola Creek, Quitman, Brooks County, GA

  16. 18 CFR Appendix A to Part 2 - Guidance for Determining the Acceptable Construction Area for Replacements

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... Typical work spaces are: Item Typical extra area (width/length) Two lane road (bored) 25-50 by 100 feet. Four lane road (bored) 50 by 100 feet. Major river (wet cut) 100 by 200 feet. Intermediate stream (wet...

  17. 5. INTERIOR VIEW SHOWING RAFTER CONSTRUCTION. SOUTHERN EXTENSION AT LEFT. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW SHOWING RAFTER CONSTRUCTION. SOUTHERN EXTENSION AT LEFT. - Chollas Heights Naval Radio Transmitting Facility, Operational Storage Building, 6410 Zero Road, San Diego, San Diego County, CA

  18. Establishing permanent vegetation after highway construction.

    DOT National Transportation Integrated Search

    2013-09-01

    The Nebraska Department of Roads (NDOR) has considerable challenges stabilizing soils on highway shoulders following construction activities. Exposed soils can be prone to erosion and offsite sediment flow during precipitation events. NDOR primarily ...

  19. 25 CFR 170.925 - Is ERFO funding supplemental to IRR Program funding?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Miscellaneous Provisions Emergency Relief § 170.925 Is ERFO funding supplemental to... construction and maintenance funds for FHWA-approved repairs. If IRR construction or maintenance funds are used... used to reimburse the construction or maintenance funds expended. ...

  20. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : V : the Richmond construction district.

    DOT National Transportation Integrated Search

    1976-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects, based on local requirements, formed a natural part of these activities. Local responsibil...

  1. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : IV : the Fredericksburg construction district.

    DOT National Transportation Integrated Search

    1976-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects, based on local requirements, formed a natural part of these activities. Local responsibil...

  2. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : II : the Staunton construction district.

    DOT National Transportation Integrated Search

    1975-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects formed a natural part of these activities. Local responsibility resulted in a rich variety...

  3. A survey and photographic inventory of metal truss bridges in Virginia, 1865-1932 : III : the Culpeper construction district.

    DOT National Transportation Integrated Search

    1975-01-01

    Prior to 1932, road maintenance and construction in Virginia were largely the responsibility of the individual county governments. Bridge construction projects formed a natural part of these activities. Local responsibility resulted in a rich variety...

  4. Renovation vs. New Construction: Choosing the Right Path

    ERIC Educational Resources Information Center

    Cruickshank, Catherine; Statz, Sam

    2013-01-01

    construction, many district administrators face a fork in the road: renovate or opt for new construction? The importance of this decision should not be taken lightly; it can have serious ramifications for years to come. Each situation is unique. Just as no two students are…

  5. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Who reviews bridge inspection reports? 170.507 Section... ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge Inspection § 170.507 Who reviews bridge inspection reports? The person responsible for the bridge inspection...

  6. Locally available aggregate and sediment production

    Treesearch

    Randy B. Foltz; Mark Truebe

    2003-01-01

    Selection of suitable locally available materials to build strong and durable roads with aggregate surfaces is desired to minimize road construction and maintenance costs and to minimize the detrimental effects of sedimentation. Eighteen aggregates were selected from local sources in Idaho, Oregon, South Dakota, and Washington State. Aggregate was placed in shallow...

  7. 77 FR 61631 - Final Environmental Impact Statement for Stehekin River Corridor Implementation Plan, Lake Chelan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... management of park facilities (e.g., roads, bridges, trails, maintenance yard) in response to increased... Meadows, while retaining private access to the area via a 0.75-mile-long reduced maintenance road... maintenance and residential facilities from floodplain areas, construction of recreational facilities and...

  8. Evaluation of cost benefits to the SCDOT with increased RAP-RAS usage : final report.

    DOT National Transportation Integrated Search

    2014-12-01

    Over 90% of U.S. highways and roads are constructed with hot mix asphalt (HMA) and as this : infrastructure ages, these highways and roads must be maintained and rehabilitated. The 1970s marked : the beginning of the widespread use of reclaimed aspha...

  9. Using shredded waste tires as a lightweight fill material for road subgrades : summary report

    DOT National Transportation Integrated Search

    1994-04-01

    Waste tires have been a disposal problem in the past and are continuing to accumulate throughout the U.S. today. Using shredded waste tires as a lightweight fill material for road construction has proven to be a beneficial use of this waste product. ...

  10. Using shredded waste tires as a lightweight fill material for road subgrades. Summary report

    DOT National Transportation Integrated Search

    1994-04-01

    Waste tires have been a disposal problem in the past and are continuing to accumulate throughout the U.S. today. Using shredded waste tires as a lightweight fill material for road construction has proven to be a beneficial use of this waste product. ...

  11. Glacier National Park : Going-to-the-Sun Road Corridor management plan - existing conditions of the transportation system

    DOT National Transportation Integrated Search

    2014-06-27

    The Going-to-the-Sun Road (GTSR) Corridor has been undergoing major shifts in use due to ongoing construction, implementation of a shuttle system, and changes in visitor use patterns. Glacier National Park (GLAC) is developing the GTSR Transportation...

  12. Improving foundation design in rock : load test at Burma Road Overpass, final report, December 2009.

    DOT National Transportation Integrated Search

    2009-12-01

    This report describes the results of a bi-directional load test on a drilled shaft foundation in weak sandstone. The test was conducted in : conjunction with construction of a new bridge at Burma Road Overpass on I-90 in Gillette, Wyoming. The purpos...

  13. 76 FR 19131 - Notice of Quarterly Report (October 1, 2010-December 31, 2010)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ...: Ring tourism and Road. business Traffic Volume development. (average annual daily traffic)--Santo: East...,083,742 Average revenue of SME added to tourism pottery workshops. and artisan sectors. Construction... road network. Rural Land Governance Project.. $59,934,615 Increase $6,348,245 TBD. investment in land...

  14. 75 FR 56580 - Notice of Quarterly Report (April 1, 2010-June 30, 2010)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... annual daily traffic)-- increase tourism Efate: Ring Road. and business Traffic Volume (average... Average revenue of SME added to tourism pottery workshops. and artisan Construction and sectors... in the road network. Rural Land Governance Project... 60,392,771 Increase investment 2,185,845 TBD...

  15. 78 FR 58089 - California State Nonroad Engine Pollution Control Standards; Off-Road Compression Ignition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ..., when presented to the Administrator are presumed to satisfy the waiver requirements and that the burden... (Hearing Transcript). EPA received testimony from CARB, the Pacific Legal Foundation (PLF), the American... Construction Trucking Association (CCTA)--EPA-HQ-OAR- 2008-0691-0309; American Road & Transportation Builders...

  16. 25 CFR 170.420 - What is the tribal priority list?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the tribal priority list? 170.420 Section 170.420 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation...

  17. 25 CFR 170.406 - How must tribes use planning funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How must tribes use planning funds? 170.406 Section 170.406 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  18. 25 CFR 170.427 - How may an IRRTIP be amended?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How may an IRRTIP be amended? 170.427 Section 170.427 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation...

  19. 25 CFR 170.425 - How does BIA update the IRRTIP?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA update the IRRTIP? 170.425 Section 170.425 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Transportation...

  20. 25 CFR 170.407 - What happens to unobligated planning funds?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to unobligated planning funds? 170.407 Section 170.407 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  1. 25 CFR 170.504 - When and how are bridge inspections performed?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false When and how are bridge inspections performed? 170.504 Section 170.504 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  2. 25 CFR 170.400 - What is the purpose of transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of transportation planning? 170.400 Section 170.400 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  3. 25 CFR 170.422 - What is the IRR Transportation Improvement Program (IRRTIP)?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the IRR Transportation Improvement Program (IRRTIP)? 170.422 Section 170.422 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  4. 25 CFR 170.421 - What is the Tribal Transportation Improvement Program (TTIP)?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the Tribal Transportation Improvement Program (TTIP)? 170.421 Section 170.421 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  5. 25 CFR 170.444 - How is the IRR Inventory updated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is the IRR Inventory updated? 170.444 Section 170.444 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Irr Inventory...

  6. 25 CFR 170.439 - How is a public hearing conducted?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How is a public hearing conducted? 170.439 Section 170.439 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Public...

  7. 25 CFR 170.507 - Who reviews bridge inspection reports?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who reviews bridge inspection reports? 170.507 Section 170.507 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Bridge...

  8. 25 CFR 170.505 - How must bridge inspections be coordinated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How must bridge inspections be coordinated? 170.505 Section 170.505 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  9. 25 CFR 170.457 - Can a tribe appeal a denial?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Design § 170.457 Can a tribe appeal a denial? Yes. If BIA denies a design exception request made by a tribe, the...

  10. 25 CFR 170.503 - How are IRR Program management systems funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program management systems funded? 170.503 Section 170.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  11. 25 CFR 170.423 - How are projects placed on the IRRTIP?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are projects placed on the IRRTIP? 170.423 Section 170.423 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  12. 35. RESERVOIR TANKS ALONG DAMIEN ROAD NEAR KAUHAKO CRATER (282'). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. RESERVOIR TANKS ALONG DAMIEN ROAD NEAR KAUHAKO CRATER (282'). WOOD TANK AT LEFT WAS ERECTED CA. 1969. CEMENT-LINED MASONRY TANKS WITH CORRUGATED METAL ROOF, CONSTRUCTED CA. 1894, ARE LOCATED AT RIGHT. - Kalaupapa Water Supply System, Waikolu Valley to Kalaupapa Settlement, Island of Molokai, Kalaupapa, Kalawao County, HI

  13. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  14. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  15. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  16. 43 CFR 5461.2 - Required payment schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... officer signs the contract. A purchaser cannot apply any portion of the first installment to cover other payments due on the contract until either 60 percent of the total purchase price has been paid or road... of the total purchase price. The value of satisfactorily completed road construction required by the...

  17. Performance of a logging truck with a central tire inflation system.

    Treesearch

    John A. Sturos; Douglas B. Brumm; Andrew Lehto

    1995-01-01

    Describes the performance of an 11-axle logging truck with a central tire inflation system. Results included reduced damages to roads, improved ride of the truck, improved drawbar pull, and reduced rolling resistance. Road construction costs were reduced 62%, primarily due to using 33% less gravel.

  18. Field assessment of the effects of roadside vegetation on near-road black carbon and particulate matter

    EPA Science Inventory

    One proposed method for reducing exposure to mobile-source air pollution is the construction or preservation of vegetation barriers between major roads and nearby populations. This study combined stationary and mobile monitoring approaches to determine the effects of an existing,...

  19. Evaluation of the base/subgrade soil under repeated loading : phase II, in-box and ALF cyclic plate load tests [tech summary].

    DOT National Transportation Integrated Search

    2012-03-01

    The inadequacy of many existing roads due to rapid growth in traffic volume provides a motivation for exploring alternatives to : existing methods of constructing and rehabilitating roads. The use of geosynthetics to stabilize and reinforce paved and...

  20. Exploring Measures to Control Road Traffic Injuries in Iran: Key Informants Points of View

    PubMed Central

    SALARI, Hedayat; MOTEVALIAN, Seyed Abbas; ARAB, Mohammad; ESFANDIARI, Atefeh; AKBARI SARI, Ali

    2017-01-01

    Background: Injuries and fatalities from road traffic Injuries are global public health concerns, and a major problem in the Iran. This study aimed to explore strategies to control road traffic Injuries (RTI) in Iran. Methods: We conducted a qualitative study to explore possible ways to reduce the occurrence of road traffic Injuries in Iran in 2016. Interviewees were purposively sampled from various sectors due to multidisciplinary nature of RTIs. Participants were mainly representatives from the police, Ministry of Road, Municipal, emergency services and Ministry of Health. Besides, public health authorities, researchers, and university professors were interviewed. We conducted in-depth interviews using generic guides. Data was analyzed using MAXQDA 10 software. Through content analysis, we interpreted core themes relevant to the accomplishment of our study objectives. Results: Themes that emerged from our study include; road traffic management, governance, education, improving accident database, enforcement, driving license restrictions, and construction of pedestrian overpass. Conclusion: This study revealed key informants’ views regarding available and affordable solutions to reduce RTIs in Iran. Many applicable strategies are identified in the control of RTIs in Iran. Although some solutions such as highway construction and/or expanding rail transportation have been suggested as effective measures for reducing accident, but they are costly and may not be fully applied in developing countries like Iran. PMID:28560198

  1. 10. June 25, 1963 SEED BUILDING UNDER CONSTRUCTION Looking northeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. June 25, 1963 SEED BUILDING UNDER CONSTRUCTION Looking northeast showing west wall of Machinery Shed - Tucson Plant Material Center, Machinery Shed, 3241 North Romero Road, Tucson, Pima County, AZ

  2. 30 CFR 817.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed, constructed and... surveyor, to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 817.49 of...

  3. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  4. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  5. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  6. 30 CFR 816.46 - Hydrologic balance: Siltation structures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...

  7. A tool for estimating impact of construction quality on life cycle performance of pavements.

    DOT National Transportation Integrated Search

    2005-11-01

    Almost every constructed road develops distresses randomly in different subsections of the pavement. One reason for the random development of distress is the variability in construction quality. As such the goal in this project is to devise a tool th...

  8. 51. Roanoke River Parkway. View of construction of the 2.2 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Roanoke River Parkway. View of construction of the 2.2 mile spur road in 1996, possibly the last major new construction project on the parkway. Facing south-southeast. - Blue Ridge Parkway, Between Shenandoah National Park & Great Smoky Mountains, Asheville, Buncombe County, NC

  9. 36 CFR 223.100 - Award to highest bidder.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bidder has elected Forest Service road construction in response to an advertisement extending such an option, the Forest Service cannot perform the construction and in response to solicitation has not received a satisfactory bid for such construction within the period stated in the prospectus and the high...

  10. Usage of Video Analysis of Traffic Conflicts for the Evaluation of Inappropriately Designed Building Elements on Intersections

    NASA Astrophysics Data System (ADS)

    Krivda, Vladislav; Petru, Jan

    2018-04-01

    Human society is constantly evolving in all areas. The transport is no exception – especially development of road transport is considerable and visible on all levels. However, it is necessary to look for tools that can harmonize economic and social progress with the full preservation of the environment for future generations. The so-called sustainable development of road transport is also closely related to the issue of creating safe transport infrastructure. For example, roads must be in compliance with technical rules on one hand and on the other one they have to be clearly understandable for all road participants (drivers, pedestrians, etc.). Unfortunately, even if the designer of transport construction meets the technical requirements, the result is a dangerous place where very frequently the accidents or traffic conflicts take place. There exist statistics of accidents, but on the contrary, there are not any statistics of traffic conflicts. And simply monitoring the traffic conflicts can lead to early detection of problematic places in road infrastructure and thus increasing the safety in the road traffic. There are many methods used for monitoring traffic conflicts. The method used in the Czech Republic is described in the submitted paper. The original method, which monitored mainly and only the behaviour of drivers and their mistakes, was innovated, so that it could be used also for evaluation of inappropriately designed building elements of road constructions. Therefore, the paper deals with the description of so-called Innovated Video Analysis of Traffic Conflicts (IVATC) and with the usage of this method for one particular example of intersection, where larger vehicles (buses, trucks, etc.) had problems with passing through it. It points out to the fact that even a relatively small change can lead to the increase of the road safety.

  11. Recent trends of the emission characteristics from the road construction industry.

    PubMed

    Chauhan, Sippy K; Sharma, Sangita; Shukla, Anuradha; Gangopadhyay, S

    2010-11-01

    Bitumen is a black, thermoplastic, hydrocarbon material derived from the processing of crude oil. At ambient temperature, bitumen is solid and does not present any health/environmental risks. This is one of the main reasons that bitumen is widely used for road construction all over the world. But during manufacturing/modification according to its application, storage, transportation, and use of bitumen is heated giving off various hydrocarbons emissions. In recent years, there has been increasing interest in investigating the potential of bitumen emissions to cause health effects. This is mainly because of the reason that bitumen has small amount of poly-aromatic hydrocarbons, along with some other volatiles like benzene, toluene, etc., which are known to be carcinogenic in nature. Thus, assessment of the emission characteristics and health hazards of bitumen fumes may have far reaching industrial economic and public health implications. In this review, we will discuss about the emission characteristics from bitumen, asphalts, or road construction, which is mainly contributed by bitumen fumes. Sampling strategies and analytical methods employed are also described briefly.

  12. 36 CFR 223.111 - Administration of contracts in designated disaster areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... road or facility, the United States shall bear such increased construction cost if, as determined by... damages are so great that restoration, reconstruction, or construction is not practical under the cost...

  13. Night-time road construction operations synthesis of practice.

    DOT National Transportation Integrated Search

    2008-05-01

    report synthesizes existing literature on nighttime construction operations, identifies gaps in the current state of knowledge, and summarizes research in progress studies that are planned or underway. The literature review and synthesis found the fo...

  14. 43. U.S. NITRATE PLANT UNDER CONSTRUCTION, STEEL BEING ERECTED FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. U.S. NITRATE PLANT UNDER CONSTRUCTION, STEEL BEING ERECTED FOR THE MACHINE SHOP, FEBRUARY 28, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  15. A portable wheel tester for tyre-road friction and rolling resistance determination

    NASA Astrophysics Data System (ADS)

    Pytka, J.; Budzyński, P.; Tarkowski, P.; Piaskowski, M.

    2016-09-01

    The paper describes theory of operation, design and construction as well as results from primarily experiments with a portable wheel tester that has been developed by the authors as a device for on-site determination of tyre-road braking/driving friction and rolling resistance. The paper includes schematics, drawings, descriptions as well as graphical results form early tests with the presented device. It is expected that the tester can be useful in road accident reconstruction applications as well as in vehicle dynamics research.

  16. Effects of road construction intensity and operations on rural freeway work zone capacity.

    DOT National Transportation Integrated Search

    2014-11-01

    Capacity is affected by construction type and its intensity on adjacent open traffic lanes. The effect on capacity is a function of : vehicles moving in and out of the closed lanes of the work zone, and the presence of heavy construction vehicles. Co...

  17. 76 FR 70809 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    .... Pavement condition index airfield inspection. Brief Description of Withdrawn Projects: Safety management... 1U19R and 7R/25L intersection repaving, construction. Perimeter road bridge over Howell Avenue, design. Inline baggage security, construction. Gate D56 improvements, design and construction. Snow removal...

  18. Item Construction and Psychometric Models Appropriate for Constructed Responses

    DTIC Science & Technology

    1991-08-01

    which involve only one attribute per item. This is especially true when we are dealing with constructed-response items, we have to measure much more...Service University of Ilinois Educacional Testing Service Rosedal Road Capign. IL 61801 Princeton. K3 08541 Princeton. N3 08541 Dr. Charles LeiS Dr

  19. Unplanned roads impacts assessment in Phewa Lake watershed, Western region, Nepal

    NASA Astrophysics Data System (ADS)

    Leibundgut, Geoffroy; Sudmeier-Rieux, Karen; Devkota, Sanjaya; Jaboyedoff, Michel; Penna, Ivanna; Adhikari, Anu; Khanal, Rajendra

    2015-04-01

    This work describes current research being conducted in the Phewa Lake watershed, near Pokhara in Nepal's Siwaliks/Middle hills, a moist sub-tropical zone with the highest amount of annual rainfall in Nepal (4,500 - 5,000 mm). The watershed lithology is mainly siltstone, sandstones and intensively weathered rocks, highly prone to erosion and shallow landslides (Agrawala et al., 2003). The main purpose of this study is to focus on the impact of unplanned earthen road construction in the Phewa Lake watershed as part of land use changes over 30 years in one of Nepal's most touristic regions. Over the past three decades, the road network has expanded exponentially and a majority of rural earthen roads are often funded by communities themselves, with some government subsidies. They are usually constructed using a local bulldozer contractor with no technical or geological expertise increasing erosion processes, slope instabilities risk and impacts to settlements, forests, water sources, agriculture lands, and infrastructure. Moreover, these human-induced phenomena are being compounded by increasingly intense monsoon rains, likely due to climate change (Petley, 2010). Research methods were interdisciplinary and based on a combination of remote sensing, field observations and discussions with community members. The study compared 30 year-old aerial photos with current high resolution satellite images to correlate changes in land use with erosion and slope instabilities. Secondly, most of the watershed's roads were surveyed in order to inventory and quantify slope instabilities and soil loss events. Using a failure-characteristics grid, their main features were measured (location, size, type and extension of damage areas, etc.) and a GIS data base was created. We then estimated economic impacts of these events in terms of agriculture lands losses and road maintenance, based on field observations and discussions with affected people. Field work investigations have shown that unplanned road excavations are producing mainly embankment failures and/or gullying which affect primarily roads themselves, wiping them out and blocking vehicle circulation, and secondly, destroying or burying agriculture lands. Initial results of the remote sensing analysis demonstrate that there is high probability of a correlation between the expansion of the road network and increased erosion/deposition in the watershed. Finally a few deep-seated and potentially very destructive failures were observed in the watershed, in large part triggered by road construction. All phenomena present economic impacts for communities due to costly interventions for clearing roads and losses of crop production. References: Agrawala, S., et al. (2003). Development and Climate Change in Nepal: Focus on Water Resources and Hydropower. Paris, OECD: 64pp. Petley, D. N. (2010). On the impact of climate change and population growth on the occurrence of landslides in Asia. Quarterly Journal of Engineering Geology and Hydrogeology, 43 (4), 487-496.

  20. A Spatial Probit Econometric Model of Land Change: The Case of Infrastructure Development in Western Amazonia, Peru

    PubMed Central

    Arima, E. Y.

    2016-01-01

    Tropical forests are now at the center stage of climate mitigation policies worldwide given their roles as sources of carbon emissions resulting from deforestation and forest degradation. Although the international community has created mechanisms such as REDD+ to reduce those emissions, developing tropical countries continue to invest in infrastructure development in an effort to spur economic growth. Construction of roads in particular is known to be an important driver of deforestation. This article simulates the impact of road construction on deforestation in Western Amazonia, Peru, and quantifies the amount of carbon emissions associated with projected deforestation. To accomplish this objective, the article adopts a Bayesian probit land change model in which spatial dependencies are defined between regions or groups of pixels instead of between individual pixels, thereby reducing computational requirements. It also compares and contrasts the patterns of deforestation predicted by both spatial and non-spatial probit models. The spatial model replicates complex patterns of deforestation whereas the non-spatial model fails to do so. In terms of policy, both models suggest that road construction will increase deforestation by a modest amount, between 200–300 km2. This translates into aboveground carbon emissions of 1.36 and 1.85 x 106 tons. However, recent introduction of palm oil in the region serves as a cautionary example that the models may be underestimating the impact of roads. PMID:27010739

  1. A Spatial Probit Econometric Model of Land Change: The Case of Infrastructure Development in Western Amazonia, Peru.

    PubMed

    Arima, E Y

    2016-01-01

    Tropical forests are now at the center stage of climate mitigation policies worldwide given their roles as sources of carbon emissions resulting from deforestation and forest degradation. Although the international community has created mechanisms such as REDD+ to reduce those emissions, developing tropical countries continue to invest in infrastructure development in an effort to spur economic growth. Construction of roads in particular is known to be an important driver of deforestation. This article simulates the impact of road construction on deforestation in Western Amazonia, Peru, and quantifies the amount of carbon emissions associated with projected deforestation. To accomplish this objective, the article adopts a Bayesian probit land change model in which spatial dependencies are defined between regions or groups of pixels instead of between individual pixels, thereby reducing computational requirements. It also compares and contrasts the patterns of deforestation predicted by both spatial and non-spatial probit models. The spatial model replicates complex patterns of deforestation whereas the non-spatial model fails to do so. In terms of policy, both models suggest that road construction will increase deforestation by a modest amount, between 200-300 km2. This translates into aboveground carbon emissions of 1.36 and 1.85 x 106 tons. However, recent introduction of palm oil in the region serves as a cautionary example that the models may be underestimating the impact of roads.

  2. Soil retention of hexavalent chromium released from construction and demolition waste in a road-base-application scenario.

    PubMed

    Butera, Stefania; Trapp, Stefan; Astrup, Thomas F; Christensen, Thomas H

    2015-11-15

    We investigated the retention of Cr(VI) in three subsoils with low organic matter content in laboratory experiments at concentration levels relevant to represent leachates from construction and demolition waste (C&DW) reused as unbound material in road construction. The retention mechanism appeared to be reduction and subsequent precipitation as Cr(III) on the soil. The reduction process was slow and in several experiments it was still proceeding at the end of the six-month experimental period. The overall retention reaction fit well with a second-order reaction governed by actual Cr(VI) concentration and reduction capacity of the soil. The experimentally determined reduction capacities and second-order kinetic parameters were used to model, for a 100-year period, the one-dimensional migration of Cr(VI) in the subsoil under a layer of C&DW. The resulting Cr(VI) concentration would be negligible below 7-70 cm depth. However, in rigid climates and with high water infiltration through the road pavement, the reduction reaction could be so slow that Cr(VI) might migrate as deep as 200 cm under the road. The reaction parameters and the model can form the basis for systematically assessing under which scenarios Cr(VI) from C&DW could lead to an environmental issue for ground- and receiving surface waters. Copyright © 2015 Elsevier B.V. All rights reserved.

  3. 76 FR 76389 - Notice of Public Meeting on the Draft Environmental Impact Statement for Basewide Water...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-07

    ... involve the construction, operation, and maintenance of infrastructure upgrades, expansions, and... Road over the Santa Margarita River (Stuart Mesa Bridge). A Notice of Intent to prepare this EIS was... Road, Fallbrook, California 92028. A copy of the Draft EIS will be made available upon written request...

  4. 43 CFR 2812.0-6 - Statement of policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... to timber roads. (b) It is well established that the value of standing timber is determined in... road available for access to all the mature and overmature timber it could tap leads to economic waste. Blocks of timber which are insufficient in volume or value to support the construction of a duplicating...

  5. 43 CFR 2812.0-6 - Statement of policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... to timber roads. (b) It is well established that the value of standing timber is determined in... road available for access to all the mature and overmature timber it could tap leads to economic waste. Blocks of timber which are insufficient in volume or value to support the construction of a duplicating...

  6. 75 FR 70349 - Notice of Final Federal Agency Actions on Proposed Highways in Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... time period of less than 180 days for filing such claim, then that shorter time period still applies... Road. Existing frontage roads would be improved, and the existing 10-foot wide pedestrian pathway would be reconstructed and/or relocated as necessary. The project also includes construction of two bridges...

  7. Sediment production in a coastal watershed: legacy, land use, recovery, and rehabilitation

    Treesearch

    Elizabeth T. Keppeler

    2012-01-01

    Sediment production has been measured for nearly half a century at the Caspar Creek Experimental Watersheds. Examination of this sediment record provides insights into the relative magnitudes and durations of sediment production from management practices including road construction, selection harvest and tractor skidding, and later road decommissioning. The 424-ha...

  8. 25 CFR 170.410 - What is the purpose of tribal long-range transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the purpose of tribal long-range transportation planning? 170.410 Section 170.410 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  9. 25 CFR 170.501 - What happens when the review process identifies areas for improvement?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens when the review process identifies areas for improvement? 170.501 Section 170.501 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  10. 25 CFR 170.436 - How are public hearings for IRR planning and projects funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are public hearings for IRR planning and projects funded? 170.436 Section 170.436 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  11. 25 CFR 170.445 - What is a strip map?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is a strip map? 170.445 Section 170.445 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Irr Inventory § 170.445...

  12. 25 CFR 170.411 - What may a long-range transportation plan include?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  13. 25 CFR 170.403 - What IRR Program funds can be used for transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What IRR Program funds can be used for transportation planning? 170.403 Section 170.403 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  14. 25 CFR 170.426 - What is the approval process for the IRRTIP?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is the approval process for the IRRTIP? 170.426 Section 170.426 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  15. 25 CFR 170.461 - May a tribe approve plans, specifications, and estimates?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false May a tribe approve plans, specifications, and estimates? 170.461 Section 170.461 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program...

  16. 25 CFR 170.424 - How does the public participate in developing the IRRTIP?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does the public participate in developing the IRRTIP? 170.424 Section 170.424 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program...

  17. 25 CFR 170.506 - What are the minimum qualifications for certified bridge inspectors?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What are the minimum qualifications for certified bridge inspectors? 170.506 Section 170.506 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...

  18. 25 CFR 170.441 - Can a decision resulting from a hearing be appealed?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a decision resulting from a hearing be appealed? 170.441 Section 170.441 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  19. 25 CFR 170.454 - What design standards are used in the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What design standards are used in the IRR Program? 170.454 Section 170.454 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  20. Management and techniques for riparian restorations: roads field guide, vol. I

    Treesearch

    Roads/Riparian Restoration Team

    2002-01-01

    Improperly constructed or maintained roads near riparian and wetland areas may degrade these valuable sites. Degradation affects many aspects of the riparian and wetland ecosystems. This field guide presents information in a practical, user friendly format to help resource managers and professionals. Well-documented evaluation and monitoring strategies are critical in...

  1. Management and techniques for riparian restorations: roads field guide, vol. II

    Treesearch

    Roads/Riparian Restoration Team

    2002-01-01

    Improperly constructed or maintained roads near riparian and wetland areas may degrade these valuable sites. Degradation affects many aspects of the riparian and wetland ecosystems. This field guide presents information in a practical, user friendly format to help resource managers and professionals. Well-documented evaluation and monitoring strategies are critical in...

  2. Sediment production and runoff from forest road sideslopes

    Treesearch

    Johnny M. Grace; Robert Rummer; Bryce J. Stokes

    1997-01-01

    Sediment and runoff production from three erosion control treatments were investigated on a newly constructed road during a two-year study period. The treatments included a wood excelsior erosion mat, native grass species, and exotic grass species. Sediment and runoff production were significantly reduced on both the cutslope and fillslope by the treatments. Grass...

  3. Green and sustainable median on a divided multilane highway

    NASA Astrophysics Data System (ADS)

    Ambak, K.; Bajuri, F. A. A.; Yusoff, N. A.; Madun, A.; Prasetijo, J.

    2017-11-01

    The road system in Malaysia showed good growth with increasing number of vehicles on the road. However, statistic of road accident is still at an alarming rate. There are many factor can contribute to the occurrence of an accident. If the accident was caused by road facilities such as street furniture, it is shown that the street furniture was failed to improve the safety of the road users. In this study, a new concept of materials for the construction of road dividers was purpose. The sustainable materials such as laterite soil, Cow Grass, tires and PVC pipes was used to replace the cement and iron guardrails in road divider construction. The main objectives of this study is to design characteristics of a road divider using natural material such as laterite soil, sand, grass and recycle material like used a tyre. A series of experiments such as test liquid limit, plastic limit test, standard proctor test and observations of root growth in 30 days were conducted. The result shows that the plastic index value of 35% was obtained. From the proctor compaction test, the optimum water content was 23% and maximum dry density at 15.3 kN/m3. This value was used to build a prototype of green and sustainable raised road median. The suitability of sand used as the medium in irrigation system was approved. Permeability of sand is 10-2 mm/s to 10 mm/s which is having a high rate of flow. The growth of Cow Grass roots was increased by 4.9 cm in 30 days. This shows that, the grass is suitable to grow in laterite soil and can be used as vegetation material. Through the impact test conducted on a model with a scale of 1:7.5, indicate the initial damage occurred when a force reaches 10N. However, the condition of the model is still stable. From the impact test conducted, the prototype of green and sustainable raised road median has a good potential to be used as existing road divider as it can absorb the impact of an accident.

  4. Importance of Topographic Features and Tactical Annotations on Maps Used by Army Aviators for Nap-of-the-Earth Flight.

    DTIC Science & Technology

    1982-01-01

    real word but, instead, are sk-bematic diagrams - stylized, simplified, generalized, and codified presentations of a selected sample of some of the...Turntable/ Roundhouse 3.53 3 Drydock 3.44 7 Barn/Shed 3.41 2 Tailings/Slag Dumps 3.34 5 Bridge Construction Type 3.20 24 Road Name/Number 3.18 7 Bridge...Shaft Mine 3.58 Stockyard 3.54 Turntable/ Roundhouse 3.53 Drydock 3.44 Barn/Shed 3.41 j Tailings/Slag Dumps 3.34 Bridge Construction Type 3.20 Road

  5. Design methods for muskeg area roads

    DOT National Transportation Integrated Search

    1982-02-01

    The objective of this report was to produce a design guide related to roadway design and construction in organic terrain referred as "Muskeg". The report covers the latest design and construction principles so that the designers, planners, builders a...

  6. 9. May 20, 1963 SEED BUILDING FOUNDATION WALLS Under Construction. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. May 20, 1963 SEED BUILDING FOUNDATION WALLS Under Construction. Looking southeast showing north and west walls of Machinery Shed - Tucson Plant Material Center, Machinery Shed, 3241 North Romero Road, Tucson, Pima County, AZ

  7. INDOT Construction Inspection Priorities : Technical Summary

    DOT National Transportation Integrated Search

    2012-05-01

    In the last decade, the Indiana Department of Transportation (INDOT) increased the number of construction projects funded by capital made available through the leasing of the Indiana Toll Road. However, during the same time period, the level of perso...

  8. 42. U.S. NITRATE PLANT UNDER CONSTRUCTION, STEEL BEING ERECTED FOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. U.S. NITRATE PLANT UNDER CONSTRUCTION, STEEL BEING ERECTED FOR THE CARBIDE MILL ROOM, APRIL 23, 1918. - United States Nitrate Plant No. 2, Reservation Road, Muscle Shoals, Muscle Shoals, Colbert County, AL

  9. Settlement Yields Protection for Deerfield River from Highway Project Runoff

    EPA Pesticide Factsheets

    Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...

  10. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... selection, land acquisition, design and planning, earth moving, landscaping, construction, and provision of... cemetery. Improvement means the enhancement of a cemetery through landscaping, construction, or renovation of cemetery infrastructure, such as building expansion and upgrades to roads and irrigation systems...

  11. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... selection, land acquisition, design and planning, earth moving, landscaping, construction, and provision of... cemetery. Improvement means the enhancement of a cemetery through landscaping, construction, or renovation of cemetery infrastructure, such as building expansion and upgrades to roads and irrigation systems...

  12. 38 CFR 39.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... selection, land acquisition, design and planning, earth moving, landscaping, construction, and provision of... cemetery. Improvement means the enhancement of a cemetery through landscaping, construction, or renovation of cemetery infrastructure, such as building expansion and upgrades to roads and irrigation systems...

  13. A global strategy for road building.

    PubMed

    Laurance, William F; Clements, Gopalasamy Reuben; Sloan, Sean; O'Connell, Christine S; Mueller, Nathan D; Goosem, Miriam; Venter, Oscar; Edwards, David P; Phalan, Ben; Balmford, Andrew; Van Der Ree, Rodney; Arrea, Irene Burgues

    2014-09-11

    The number and extent of roads will expand dramatically this century. Globally, at least 25 million kilometres of new roads are anticipated by 2050; a 60% increase in the total length of roads over that in 2010. Nine-tenths of all road construction is expected to occur in developing nations, including many regions that sustain exceptional biodiversity and vital ecosystem services. Roads penetrating into wilderness or frontier areas are a major proximate driver of habitat loss and fragmentation, wildfires, overhunting and other environmental degradation, often with irreversible impacts on ecosystems. Unfortunately, much road proliferation is chaotic or poorly planned, and the rate of expansion is so great that it often overwhelms the capacity of environmental planners and managers. Here we present a global scheme for prioritizing road building. This large-scale zoning plan seeks to limit the environmental costs of road expansion while maximizing its benefits for human development, by helping to increase agricultural production, which is an urgent priority given that global food demand could double by mid-century. Our analysis identifies areas with high environmental values where future road building should be avoided if possible, areas where strategic road improvements could promote agricultural development with relatively modest environmental costs, and 'conflict areas' where road building could have sizeable benefits for agriculture but with serious environmental damage. Our plan provides a template for proactively zoning and prioritizing roads during the most explosive era of road expansion in human history.

  14. Usage of Alternative, Environmentally Acceptable Materials—Experience from Eastern Croatia

    NASA Astrophysics Data System (ADS)

    Barišić, I.; Zagvozda, M.; Dimter, S.

    2015-11-01

    The concept of sustainability should be the main guiding principle in the construction industry today. It mandates conservation of natural resources and thus lower impact on the environment. In road construction, part of construction industry that consumes largest quantities of natural materials, sustainable building and maintenance of roads is possible trough application of secondary materials. Usage of industrial and construction waste presents energy, ecologically and financially effective alternative. Republic of Croatia, even as a new member of the European Union, still lags behind the well-established practices of the application of alternative materials in different European countries. The reasons for this can be found in the current legal and technical regulations for alternative materials. In this paper, the existing regulations for alternative materials and the impact they have on the application of these materials in practice in the region of eastern Croatia will be shown.

  15. Development of Environmental Load Estimation Model for Road Drainage Systems in the Early Design Phase

    NASA Astrophysics Data System (ADS)

    Park, Jin-Young; Lee, Dong-Eun; Kim, Byung-Soo

    2017-10-01

    Due to the increasing concern about climate change, efforts to reduce environmental load are continuously being made in construction industry, and LCA (life cycle assessment) is being presented as an effective method to assess environmental load. Since LCA requires information on construction quantity used for environmental load estimation, however, it is not being utilized in the environmental review in the early design phase where it is difficult to obtain such information. In this study, computation system for construction quantity based on standard cross section of road drainage facilities was developed to compute construction quantity required for LCA using only information available in the early design phase to develop and verify the effectiveness of a model that can perform environmental load estimation. The result showed that it is an effective model that can be used in the early design phase as it revealed a 13.39% mean absolute error rate.

  16. Response of moose to a high‐density road network

    USGS Publications Warehouse

    Wattles, David W.; Zeller, Katherine A.; DeStefano, Stephen

    2018-01-01

    Road networks and the disturbance associated with vehicle traffic alter animal behavior, movements, and habitat selection. The response of moose (Alces americanus) to roads has been documented in relatively rural areas, but less is known about moose response to roads in more highly roaded landscapes. We examined road‐crossing frequencies and habitat use of global positioning system (GPS)‐collared moose in Massachusetts, USA, where moose home ranges have road densities approximately twice that of previous studies. We compared seasonal road‐crossing frequencies of moose with a null movement model. We estimated moose travel speeds during road‐crossing events and compared them with speeds during other home range movements. To estimate the extent of the road effect zone and determine how roads influenced moose habitat use, we fit a third‐order resource selection function. With the exception of the lowest use road class (<10 vehicles/day), we found moose crossed roads less than expected based on the null movement model and frequency decreased with increasing road size and traffic. Moose crossed roads faster than they traveled during other times. This effect increased with increasing road use intensity. Overall, roads were a major factor determining what portions of Massachusetts moose used and how they moved among habitat patches. Our results suggest that moose in Massachusetts can adapt to a high‐density road network, but the road effect is still strongly negative and, in some cases, is more pronounced than in study areas with lower road densities. Future road construction and the expansion of road networks may have a large effect on moose and other wildlife.

  17. On the use of space photography for identifying transportation routes: A summary of problems

    NASA Technical Reports Server (NTRS)

    Simonett, D. S.; Henderson, F. M.; Egbert, D. D.

    1970-01-01

    It has been widely suggested that space photography may be used for updating maps of transportation networks. Proponents of the argument have suggested that color space photographs of the resolution obtained with Hasselblad 80 mm lenses (about 300 feet) contain enough useful information to update the extensions of major U. S. highways. The present study systematically documents for the Dallas-Fort Worth area the potential of such space photography in detecting, and to a lesser degree identifying, the existing road networks. Color separation plates and an enlargement of the color photograph were produced and all visible roads traced onto transparencies for study. Major roads and roads under construction were the most visible while lower class roads and roads in urban areas had the poorest return. Road width and classification were found to be the major determinant in visibility, varying from 100 per cent visible for divided highways to 15 per cent visible of bladed earth roads. In summary, space photographs of this resolution proved to be difficult to use for accurate road delineation. Only super highways in rural areas with the greatest road-width were completely identifiable, the width being about 1/3 that of the resolution cell.

  18. Impact of a Newly Constructed Motor Vehicle Road on Altitude Illness in the Nepal Himalayas.

    PubMed

    Reisman, Jonathan; Deonarain, Dinesh; Basnyat, Buddha

    2017-12-01

    This study investigated the impact that motor vehicle travel along a newly constructed road has on altitude illness (including acute mountain sickness, high-altitude cerebral edema, and high-altitude pulmonary edema). The new road from Besisahar (760 m) to Manang (3540 m) in Nepal was completed in December 2014. We enrolled all patients diagnosed with altitude illness at the Himalayan Rescue Association Manang clinic in fall 2016. Phi coefficients were calculated to test for an association between Nepali ethnicity and rapid ascent by motor vehicle. A retrospective review looked at all patients with altitude illness from fall (September-November) 2010 to spring (February-May) 2016. In fall 2016, more than half (54%) of patients with altitude illness traveled to Manang by motor vehicle, and one-third (33%) reached Manang from low altitude (Besisahar) in less than 48 hours. Nepali nationality had a significant association with motor vehicle travel (phi +0.69, P < .0001) as well as with rapid ascent to Manang (phi +0.72, P < .0001). Compared to previous seasons, fall 2016 saw the most patients diagnosed with altitude illness. The proportion of people with altitude illness who traveled by vehicle and reached Manang in less than 48 hours was significantly greater than the proportion prior to completion of the road (P < .0001 for both). Rapid ascent by the newly constructed road from Besisahar to Manang appears to be related to a significant increase in the number of patients with all forms of altitude illness, especially among Nepalis. The authors believe that educational interventions emphasizing prevention are urgently needed. Copyright © 2017 Wilderness Medical Society. Published by Elsevier Inc. All rights reserved.

  19. Road landslide information management and forecasting system base on GIS.

    PubMed

    Wang, Wei Dong; Du, Xiang Gang; Xie, Cui Ming

    2009-09-01

    Take account of the characters of road geological hazard and its supervision, it is very important to develop the Road Landslides Information Management and Forecasting System based on Geographic Information System (GIS). The paper presents the system objective, function, component modules and key techniques in the procedure of system development. The system, based on the spatial information and attribute information of road geological hazard, was developed and applied in Guizhou, a province of China where there are numerous and typical landslides. The manager of communication, using the system, can visually inquire all road landslides information based on regional road network or on the monitoring network of individual landslide. Furthermore, the system, integrated with mathematical prediction models and the GIS's strongpoint on spatial analyzing, can assess and predict landslide developing procedure according to the field monitoring data. Thus, it can efficiently assists the road construction or management units in making decision to control the landslides and to reduce human vulnerability.

  20. 76 FR 67670 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ..., modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction... will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single...

Top