Sample records for safety control room

  1. 75 FR 67450 - Pipeline Safety: Control Room Management Implementation Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... PHMSA-2010-0294] Pipeline Safety: Control Room Management Implementation Workshop AGENCY: Pipeline and...) on the implementation of pipeline control room management. The workshop is intended to foster an understanding of the Control Room Management Rule issued by PHMSA on December 3, 2009, and is open to the public...

  2. 75 FR 69912 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... 192 and 195 [Docket ID PHMSA-2007-27954] RIN 2137-AE64 Pipeline Safety: Control Room Management/Human... rulemaking; Extension of comment period. SUMMARY: On September 17, 2010, PHMSA published a Control Room... Control Room Management/Human Factors rule at 49 CFR 192.631 and 195.446. The NPRM proposes to expedite...

  3. 76 FR 35130 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors AGENCY: Pipeline and Hazardous Materials Safety Administration... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  4. The Aircraft Simulation Role in Improving Flight Safety Through Control Room Training

    NASA Technical Reports Server (NTRS)

    Shy, Karla S.; Hageman, Jacob J.; Le, Jeanette H.; Sitz, Joel (Technical Monitor)

    2002-01-01

    NASA Dryden Flight Research Center uses its six-degrees-of-freedom (6-DOF) fixed-base simulations for mission control room training to improve flight safety and operations. This concept is applied to numerous flight projects such as the F-18 High Alpha Research Vehicle (HARV), the F-15 Intelligent Flight Control System (IFCS), the X-38 Actuator Control Test (XACT), and X-43A (Hyper-X). The Dryden 6-DOF simulations are typically used through various stages of a project, from design to ground tests. The roles of these simulations have expanded to support control room training, reinforcing flight safety by building control room staff proficiency. Real-time telemetry, radar, and video data are generated from flight vehicle simulation models. These data are used to drive the control room displays. Nominal static values are used to complete information where appropriate. Audio communication is also an integral part of training sessions. This simulation capability is used to train control room personnel and flight crew for nominal missions and emergency situations. Such training sessions are also opportunities to refine flight cards and control room display pages, exercise emergency procedures, and practice control room setup for the day of flight. This paper describes this technology as it is used in the X-43A and F-15 IFCS and XACT projects.

  5. 75 FR 5536 - Pipeline Safety: Control Room Management/Human Factors, Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors, Correction AGENCY: Pipeline and Hazardous Materials Safety... following correcting amendments: PART 192--TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM...

  6. Improving operating room safety

    PubMed Central

    2009-01-01

    Despite the introduction of the Universal Protocol, patient safety in surgery remains a daily challenge in the operating room. This present study describes one community health system's efforts to improve operating room safety through human factors training and ultimately the development of a surgical checklist. Using a combination of formal training, local studies documenting operating room safety issues and peer to peer mentoring we were able to substantially change the culture of our operating room. Our efforts have prepared us for successfully implementing a standardized checklist to improve operating room safety throughout our entire system. Based on these findings we recommend a multimodal approach to improving operating room safety. PMID:19930577

  7. HFE safety reviews of advanced nuclear power plant control rooms

    NASA Technical Reports Server (NTRS)

    Ohara, John

    1994-01-01

    Advanced control rooms (ACR's) will utilize human-system interface (HSI) technologies that may have significant implications for plant safety in that they will affect the operator's overall role and means of interacting with the system. The Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) aspects of HSI's to ensure that they are designed to good HFE principles and support performance and reliability in order to protect public health and safety. However, the only available NRC guidance was developed more than ten years ago, and does not adequately address the human performance issues and technology changes associated with ACR's. Accordingly, a new approach to ACR safety reviews was developed based upon the concept of 'convergent validity'. This approach to ACR safety reviews is described.

  8. Energy Systems Integration Facility Control Room | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Energy Systems Integration Facility Control Room Energy Systems Integration Facility Control Room The Energy Systems Integration Facility control room allows system engineers as the monitoring point for the facility's integrated safety and control systems. Photo of employees

  9. [Operating Room Nurses' Experiences of Securing for Patient Safety].

    PubMed

    Park, Kwang Ok; Kim, Jong Kyung; Kim, Myoung Sook

    2015-10-01

    This study was done to evaluate the experience of securing patient safety in hospital operating rooms. Experiential data were collected from 15 operating room nurses through in-depth interviews. The main question was "Could you describe your experience with patient safety in the operating room?". Qualitative data from the field and transcribed notes were analyzed using Strauss and Corbin's grounded theory methodology. The core category of experience with patient safety in the operating room was 'trying to maintain principles of patient safety during high-risk surgical procedures'. The participants used two interactional strategies: 'attempt continuous improvement', 'immersion in operation with sharing issues of patient safety'. The results indicate that the important factors for ensuring the safety of patients in the operating room are manpower, education, and a system for patient safety. Successful and safe surgery requires communication, teamwork and recognition of the importance of patient safety by the surgical team.

  10. SIG -- The Role of Human-Computer Interaction in Next-Generation Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L. Boring; Jacques Hugo; Christian Richard

    2005-04-01

    The purpose of this CHI Special Interest Group (SIG) is to facilitate the convergence between human-computer interaction (HCI) and control room design. HCI researchers and practitioners actively need to infuse state-of-the-art interface technology into control rooms to meet usability, safety, and regulatory requirements. This SIG outlines potential HCI contributions to instrumentation and control (I&C) and automation in control rooms as well as to general control room design.

  11. TeamSTEPPS Improves Operating Room Efficiency and Patient Safety.

    PubMed

    Weld, Lancaster R; Stringer, Matthew T; Ebertowski, James S; Baumgartner, Timothy S; Kasprenski, Matthew C; Kelley, Jeremy C; Cho, Doug S; Tieva, Erwin A; Novak, Thomas E

    2016-09-01

    The objective was to evaluate the effect of TeamSTEPPS on operating room efficiency and patient safety. TeamSTEPPS consisted of briefings attended by all health care personnel assigned to the specific operating room to discuss issues unique to each case scheduled for that day. The operative times, on-time start rates, and turnover times of all cases performed by the urology service during the initial year with TeamSTEPPS were compared to the prior year. Patient safety issues identified during postoperative briefings were analyzed. The mean case time was 12.7 minutes less with TeamSTEPPS (P < .001). The on-time first-start rate improved by 21% with TeamSTEPPS (P < .001). The mean room turnover time did not change. Patient safety issues declined from an initial rate of 16% to 6% at midyear and remained stable (P < 0.001). TeamSTEPPS was associated with improved operating room efficiency and diminished patient safety issues in the operating room. © The Author(s) 2015.

  12. Control centers design for ergonomics and safety.

    PubMed

    Quintana, Leonardo; Lizarazo, Cesar; Bernal, Oscar; Cordoba, Jorge; Arias, Claudia; Monroy, Magda; Cotrino, Carlos; Montoya, Olga

    2012-01-01

    This paper shows the general design conditions about ergonomics and safety for control centers in the petrochemical process industry. Some of the topics include guidelines for the optimized workstation design, control room layout, building layout, and lighting, acoustical and environmental design. Also takes into account the safety parameters in the control rooms and centers design. The conditions and parameters shown in this paper come from the standards and global advances on this topic on the most recent publications. And also the work was supplemented by field visits of our team to the control center operations in a petrochemical company, and technical literature search efforts. This guideline will be useful to increase the productivity and improve the working conditions at the control rooms.

  13. 10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. CONTROL ROOM INTERIOR. Looking into southwest corner. CONTROL ROOM INTERIOR, SHOWING ESCAPE HATCH. Looking north along east wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  14. Attitudes to teamwork and safety among Italian surgeons and operating room nurses.

    PubMed

    Prati, Gabriele; Pietrantoni, Luca

    2014-01-01

    Previous studies have shown that surgical team members' attitudes about safety and teamwork in the operating theatre may play a role in patient safety. The aim of this study was to assess attitudes about teamwork and safety among Italian surgeons and operating room nurses. Fifty-five surgeons and 48 operating room nurses working in operating theatres at one hospital in Italy completed the Operating Room Management Attitudes Questionnaire (ORMAQ). Results showed several discrepancies in attitudes about teamwork and safety between surgeons and operating room nurses. Surgeons had more positive views on the quality of surgical leadership, communication, teamwork, and organizational climate in the theatre than operating room nurses. Operating room nurses reported that safety rules and procedures were more frequently disregarded than the surgeons. The results are only partially aligned with previous ORMAQ surveys of surgical teams in other countries. The differences emphasize the influence of national culture, as well as the particular healthcare system. This study shows discrepancies on many aspects in attitudes to teamwork and safety between surgeons and operating room nurses. The findings support implementation and use of team interventions and human factor training. Finally, attitude surveys provide a method for assessing safety culture in surgery, for evaluating the effectiveness of training initiatives, and for collecting data for a hospital's quality assurance programme.

  15. Safety culture in the gynecology robotics operating room.

    PubMed

    Zullo, Melissa D; McCarroll, Michele L; Mendise, Thomas M; Ferris, Edward F; Roulette, G D; Zolton, Jessica; Andrews, Stephen J; von Gruenigen, Vivian E

    2014-01-01

    To measure the safety culture in the robotics surgery operating room before and after implementation of the Robotic Operating Room Computerized Checklist (RORCC). Prospective study. Gynecology surgical staff (n = 32). An urban community hospital. The Safety Attitudes Questionnaire domains examined were teamwork, safety, job satisfaction, stress recognition, perceptions of management, and working conditions. Questions and domains were described using percent agreement and the Cronbach alpha. Paired t-tests were used to describe differences before and after implementation of the checklist. Mean (SD) staff age was 46.7 (9.5) years, and most were women (78%) and worked full-time (97%). Twenty respondents (83% of nurses, 80% of surgeons, 66% of surgical technicians, and 33% of certified registered nurse anesthetists) completed the Safety Attitudes Questionnaire; 6 were excluded because of non-matching identifiers. Before RORCC implementation, the highest quality of communication and collaboration was reported by surgeons and surgical technicians (100%). Certified registered nurse anesthetists reported only adequate levels of communication and collaboration with other positions. Most staff reported positive responses for teamwork (48%; α = 0.81), safety (47%; α = 0.75), working conditions (37%; α = 0.55), stress recognition (26%; α = 0.71), and perceptions of management (32%; α = 0.52). No differences were observed after RORCC implementation. Quality of communication and collaboration in the gynecology robotics operating room is high between most positions; however, safety attitude responses are low overall. No differences after RORCC implementation and low response rates may highlight lack of staff support. Copyright © 2014. Published by Elsevier Inc.

  16. Designing an Alternate Mission Operations Control Room

    NASA Technical Reports Server (NTRS)

    Montgomery, Patty; Reeves, A. Scott

    2014-01-01

    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

  17. Document handover of ISS Flight Control room to new Flight Control Room in old MCC

    NASA Image and Video Library

    2006-10-06

    JSC2006-E-43863 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. This view is toward the rear of the "new" room. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.

  18. Document handover of ISS Flight Control room to new Flight Control Room in old MCC

    NASA Image and Video Library

    2006-10-06

    JSC2006-E-43860 (6 Oct. 2006)--- International Space Station flight controllers have this area as their new home with increased technical capabilities, more workspace and a long, distinguished history. The newly updated facility is just down the hall from its predecessor at NASA's Johnson Space Center, Houston. Known as Flight Control Room 1, it was first used to control a space flight 38 years ago, the mission of Apollo 7 launched Oct. 11, 1968. It was one of two control rooms for NASA's manned missions. The room it replaces in its new ISS role, designated the Blue Flight Control Room, had been in operation since the first station component was launched in 1998.

  19. Designing an Alternate Mission Operations Control Room

    NASA Technical Reports Server (NTRS)

    Montgomery, Patty; Reeves, A. Scott

    2014-01-01

    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that

  20. 28. UPPER STATION, LOWER FLOOR, BULL WHEEL ROOM, SAFETY BRAKE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. UPPER STATION, LOWER FLOOR, BULL WHEEL ROOM, SAFETY BRAKE ADJUSTING MACHINERY. - Monongahela Incline Plane, Connecting North side of Grandview Avenue at Wyoming Street with West Carson Street near Smithfield Street, Pittsburgh, Allegheny County, PA

  1. 143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  2. PBF Control Building (PER619). Interior of control room shows control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room shows control console from direction facing visitors room and its observation window. Camera facing northeast. Date: May 2004. INEEL negative no. HD-41-7-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  3. PBF Control Building (PER619). Interior of control room. Control console ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior of control room. Control console in center of room. Indicator panels along walls. Window shown in ID-33-F-120 is between control panels at left. Camera facing northwest. Date: May 2004. INEEL negative no. HD-41-7-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  4. 8. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS NORTHEAST CORNER. TELEMETRY ROOM VISIBLE THROUGH WINDOWS IN SOUTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. 7. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHWEST CORNER. NOTE RAISED FLATFORM IN CENTER OF ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. Nuclear reactor control room construction

    DOEpatents

    Lamuro, R.C.; Orr, R.

    1993-11-16

    A control room for a nuclear plant is disclosed. In the control room, objects labelled 12, 20, 22, 26, 30 in the drawing are no less than four inches from walls labelled 10.2. A ceiling contains cooling fins that extend downwards toward the floor from metal plates. A concrete slab is poured over the plates. Studs are welded to the plates and are encased in the concrete. 6 figures.

  7. Nuclear reactor control room construction

    DOEpatents

    Lamuro, Robert C.; Orr, Richard

    1993-01-01

    A control room 10 for a nuclear plant is disclosed. In the control room, objects 12, 20, 22, 26, 30 are no less than four inches from walls 10.2. A ceiling 32 contains cooling fins 35 that extend downwards toward the floor from metal plates 34. A concrete slab 33 is poured over the plates. Studs 36 are welded to the plates and are encased in the concrete.

  8. Auto identification technology and its impact on patient safety in the Operating Room of the Future.

    PubMed

    Egan, Marie T; Sandberg, Warren S

    2007-03-01

    Automatic identification technologies, such as bar coding and radio frequency identification, are ubiquitous in everyday life but virtually nonexistent in the operating room. User expectations, based on everyday experience with automatic identification technologies, have generated much anticipation that these systems will improve readiness, workflow, and safety in the operating room, with minimal training requirements. We report, in narrative form, a multi-year experience with various automatic identification technologies in the Operating Room of the Future Project at Massachusetts General Hospital. In each case, the additional human labor required to make these ;labor-saving' technologies function in the medical environment has proved to be their undoing. We conclude that while automatic identification technologies show promise, significant barriers to realizing their potential still exist. Nevertheless, overcoming these obstacles is necessary if the vision of an operating room of the future in which all processes are monitored, controlled, and optimized is to be achieved.

  9. One size fits all? Mixed methods evaluation of the impact of 100% single-room accommodation on staff and patient experience, safety and costs

    PubMed Central

    Maben, Jill; Penfold, Clarissa; Simon, Michael; Anderson, Janet E; Robert, Glenn; Pizzo, Elena; Hughes, Jane; Murrells, Trevor; Barlow, James

    2016-01-01

    Background and objectives There is little strong evidence relating to the impact of single-room accommodation on healthcare quality and safety. We explore the impact of all single rooms on staff and patient experience; safety outcomes; and costs. Methods Mixed methods pre/post ‘move’ comparison within four nested case study wards in a single acute hospital with 100% single rooms; quasi-experimental before-and-after study with two control hospitals; analysis of capital and operational costs associated with single rooms. Results Two-thirds of patients expressed a preference for single rooms with comfort and control outweighing any disadvantages (sense of isolation) felt by some. Patients appreciated privacy, confidentiality and flexibility for visitors afforded by single rooms. Staff perceived improvements (patient comfort and confidentiality), but single rooms were worse for visibility, surveillance, teamwork, monitoring and keeping patients safe. Staff walking distances increased significantly post move. A temporary increase of falls and medication errors in one ward was likely to be associated with the need to adjust work patterns rather than associated with single rooms per se. We found no evidence that single rooms reduced infection rates. Building an all single-room hospital can cost 5% more with higher housekeeping and cleaning costs but the difference is marginal over time. Conclusions Staff needed to adapt their working practices significantly and felt unprepared for new ways of working with potentially significant implications for the nature of teamwork in the longer term. Staff preference remained for a mix of single rooms and bays. Patients preferred single rooms. PMID:26408568

  10. Safety status system for operating room devices.

    PubMed

    Guédon, Annetje C P; Wauben, Linda S G L; Overvelde, Marlies; Blok, Joleen H; van der Elst, Maarten; Dankelman, Jenny; van den Dobbelsteen, John J

    2014-01-01

    Since the increase of the number of technological aids in the operating room (OR), equipment-related incidents have come to be a common kind of adverse events. This underlines the importance of adequate equipment management to improve the safety in the OR. A system was developed to monitor the safety status (periodic maintenance and registered malfunctions) of OR devices and to facilitate the notification of malfunctions. The objective was to assess whether the system is suitable for use in an busy OR setting and to analyse its effect on the notification of malfunctions. The system checks automatically the safety status of OR devices through constant communication with the technical facility management system, informs the OR staff real-time and facilitates notification of malfunctions. The system was tested for a pilot period of six months in four ORs of a Dutch teaching hospital and 17 users were interviewed on the usability of the system. The users provided positive feedback on the usability. For 86.6% of total time, the localisation of OR devices was accurate. 62 malfunctions of OR devices were reported, an increase of 12 notifications compared to the previous year. The safety status system was suitable for an OR complex, both from a usability and technical point of view, and an increase of reported malfunctions was observed. The system eases monitoring the safety status of equipment and is a promising tool to improve the safety related to OR devices.

  11. Is single room hospital accommodation associated with differences in healthcare-associated infection, falls, pressure ulcers or medication errors? A natural experiment with non-equivalent controls.

    PubMed

    Simon, Michael; Maben, Jill; Murrells, Trevor; Griffiths, Peter

    2016-07-01

    A wide range of patient benefits have been attributed to single room hospital accommodation including a reduction in adverse patient safety events. However, studies have been limited to the US with limited evidence from elsewhere. The aim of this study was to assess the impact on safety outcomes of the move to a newly built all single room acute hospital. A natural experiment investigating the move to 100% single room accommodation in acute assessment, surgical and older people's wards. Move to 100% single room accommodation compared to 'steady state' and 'new build' control hospitals. Falls, pressure ulcer, medication error, meticillin-resistant Staphylococcus aureus and Clostridium difficile rates from routine data sources were measured over 36 months. Five of 15 time series in the wards that moved to single room accommodation revealed changes that coincided with the move to the new all single room hospital: specifically, increased fall, pressure ulcer and Clostridium difficile rates in the older people's ward, and temporary increases in falls and medication errors in the acute assessment unit. However, because the case mix of the older people's ward changed, and because the increase in falls and medication errors on the acute assessment ward did not last longer than six months, no clear effect of single rooms on the safety outcomes was demonstrated. There were no changes to safety events coinciding with the move at the new build control site. For all changes in patient safety events that coincided with the move to single rooms, we found plausible alternative explanations such as case-mix change or disruption as a result of the re-organization of services after the move. The results provide no evidence of either benefit or harm from all single room accommodation in terms of safety-related outcomes, although there may be short-term risks associated with a move to single rooms. © The Author(s) 2016.

  12. Environmental Health and Safety Hazards Experienced by Home Health Care Providers: A Room-by-Room Analysis.

    PubMed

    Polivka, Barbara J; Wills, Celia E; Darragh, Amy; Lavender, Steven; Sommerich, Carolyn; Stredney, Donald

    2015-11-01

    The number of personnel providing in-home health care services is increasing substantially. The unique configuration of environmental hazards in individual client homes has a significant impact on the safety and health of home health care providers (HHPs). This mixed-methods study used data from a standardized questionnaire, focus groups, and individual interviews to explore environmental health and safety hazards encountered by HHPs in client homes. The participant sample (N = 68) included nurses, aides, therapists, and owners/managers from a variety of geographic locations. The most often-reported hazards were trip/slip/lift hazards, biohazards, and hazards from poor air quality, allergens, pests and rodents, and fire and burns. Frequency of identified key hazards varied by room, that is, kitchen (e.g., throw rugs, water on floor), bathroom (e.g., tight spaces for client handling), bedroom (e.g., bed too low), living room (e.g., animal waste), and hallway (e.g., clutter). Findings indicate the need for broader training to enable HHPs to identify and address hazards they encounter in client homes. © 2015 The Author(s).

  13. Human factors engineering verification and validation for APR1400 computerized control room

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shin, Y. C.; Moon, H. K.; Kim, J. H.

    2006-07-01

    This paper introduces the Advanced Power Reactor 1400 (APR1400) HFE V and V activities the Korea Hydro Nuclear Plant Co. LTD. (KHNP) has performed for the last 10 years and some of the lessons learned through these activities. The features of APR1400 main control room include large display panel, redundant compact workstations, computer-based procedure, and safety console. Several iterations of human factors evaluations have been performed from small scale proof of concept tests to large scale integrated system tests for identifying human engineering deficiencies in the human system interface design. Evaluations in the proof of concept test were focused onmore » checking the presence of any show stopper problems in the design concept. Later evaluations were mostly for finding design problems and for assuring the resolution of human factors issues of advanced control room. The results of design evaluations were useful not only for refining the control room design, but also for licensing the standard design. Several versions of APR1400 mock-ups with dynamic simulation models of currently operating Korea Standard Nuclear Plant (KSNP) have been used for the evaluations with the participation of operators from KSNP plants. (authors)« less

  14. Use of patient safety culture instruments in operating rooms: A systematic literature review.

    PubMed

    Zhao, Pujng; Li, Yaqin; Li, Zhi; Jia, Pengli; Zhang, Longhao; Zhang, Mingming

    2017-05-01

    To identify and qualitatively describe, in a literature review, how the instruments were used to evaluate patient safety culture in the operating rooms of published studies. Systematic searches of the literature were conducted using the major database including MEDLINE, EMbase, The Cochrane Library, and four Chinese databases including Chinese Biomedical Literature Database (CBM), Wanfang Data, Chinese Scientific Journal Database (VIP), and Chinese Journals Full-text Database (CNKI) for studies published up to March 2016. We summarized and analyzed the country scope, the instrument utilized in the study, the year when the instrument was used, and fields of operating rooms. Study populations, study settings, and the time span between baseline and follow-up phase were evaluated according to the study design. We identified 1025 references, of which 99 were obtained for full-text assessment; 47 of these studies were deemed relevant and included in the literature review. Most of the studies were from the USA. The most commonly used patient safety culture instrument was Safety Attitude Questionnaire. All identified instruments were used after 2002 and across many fields. Most included studies on patient safety culture were conducted in teaching hospitals or university hospitals. The study population in the cross-sectional studies was much more than that in the before-after studies. The time span between baseline and follow-up phase of before-after studies were almost over three months. Although patient safety culture is considered important in health care and patient safety, the number of studies in which patient safety culture has been estimated using the instruments in operating rooms, is fairly small. © 2017 Chinese Cochrane Center, West China Hospital of Sichuan University and John Wiley & Sons Australia, Ltd.

  15. Altitude Wind Tunnel Control Room

    NASA Image and Video Library

    1945-05-21

    Researchers at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory monitor a ramjet's performance in the Altitude Wind Tunnel from the control room. The soundproof control room was just a few feet from the tunnel’s 20-foot-diameter test section. In the control room, the operators could control all aspects of the tunnel’s operation, including the air density, temperature, and speed. They also operated the engine or test article in the test section by controlling the angle-of-attack, speed, power, and other parameters. The men in this photograph are monitoring the engine’s thrust and lift. A NACA-designed 20-inch-diameter ramjet was installed in the tunnel in May 1945. Thrust figures from these runs were compared with drag data from tests of scale models in small supersonic tunnels to verify the ramjet’s feasibility. The tunnel was used to analyze the ramjet’s overall performance up to altitudes of 47,000 feet and speeds to Mach 1.84. The researchers found that an increase in altitude caused a reduction in the engine’s horsepower and identified optimal flameholder configurations.

  16. 6. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHEAST CORNER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  17. Advanced nuclear plant control room complex

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1993-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  18. Is single room hospital accommodation associated with differences in healthcare-associated infection, falls, pressure ulcers or medication errors? A natural experiment with non-equivalent controls

    PubMed Central

    Maben, Jill; Murrells, Trevor; Griffiths, Peter

    2016-01-01

    Objectives A wide range of patient benefits have been attributed to single room hospital accommodation including a reduction in adverse patient safety events. However, studies have been limited to the US with limited evidence from elsewhere. The aim of this study was to assess the impact on safety outcomes of the move to a newly built all single room acute hospital. Methods A natural experiment investigating the move to 100% single room accommodation in acute assessment, surgical and older people’s wards. Move to 100% single room accommodation compared to ‘steady state’ and ‘new build’ control hospitals. Falls, pressure ulcer, medication error, meticillin-resistant Staphylococcus aureus and Clostridium difficile rates from routine data sources were measured over 36 months. Results Five of 15 time series in the wards that moved to single room accommodation revealed changes that coincided with the move to the new all single room hospital: specifically, increased fall, pressure ulcer and Clostridium difficile rates in the older people’s ward, and temporary increases in falls and medication errors in the acute assessment unit. However, because the case mix of the older people’s ward changed, and because the increase in falls and medication errors on the acute assessment ward did not last longer than six months, no clear effect of single rooms on the safety outcomes was demonstrated. There were no changes to safety events coinciding with the move at the new build control site. Conclusion For all changes in patient safety events that coincided with the move to single rooms, we found plausible alternative explanations such as case-mix change or disruption as a result of the re-organization of services after the move. The results provide no evidence of either benefit or harm from all single room accommodation in terms of safety-related outcomes, although there may be short-term risks associated with a move to single rooms. PMID:26811373

  19. Software Support during a Control Room Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michele Joyce; Michael Spata; Thomas Oren

    2005-09-21

    In 2004, after 14 years of accelerator operations and commissioning, Jefferson Lab renovated its main control room. Changes in technology and lessons learned during those 14 years drove the control room redesign in a new direction, one that optimizes workflow and makes critical information and controls available to everyone in the control room. Fundamental changes in a variety of software applications were required to facilitate the new operating paradigm. A critical component of the new control room design is a large-format video wall that is used to make a variety of operating information available to everyone in the room. Analogmore » devices such as oscilloscopes and function generators are now displayed on the video wall through two crosspoint switchers: one for analog signals and another for video signals. A new software GUI replaces manual configuration of the oscilloscopes and function generators and helps automate setup. Monitoring screens, customized for the video wall, now make important operating information visible to everyone, not just a single operator. New alarm handler software gives any operator, on any workstation, access to all alarm handler functionality, and multiple users can now contribute to a single electronic logbook entry. To further support the shift to distributed access and control, many applications have been redesigned to run on servers instead of on individual workstations.« less

  20. A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joe, Jeffrey C.

    Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model formore » U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.« less

  1. KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee secures a foot and leg cover of his "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  2. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the head and face cover of a "bunny suit," part of standard clean room apparel, before entering a clean room. This apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  3. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the coverall of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  4. KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dons the foot and leg covers of a "bunny suit," part of standard clean room apparel, before entering a clean room. The apparel is designed to cover the hair, clothing and shoes of employees to prevent particulate matter from contaminating the space flight hardware being stored or processed in the clean room and is one aspect of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  5. Using human factors engineering to improve patient safety in the cardiovascular operating room.

    PubMed

    Gurses, Ayse P; Martinez, Elizabeth A; Bauer, Laura; Kim, George; Lubomski, Lisa H; Marsteller, Jill A; Pennathur, Priyadarshini R; Goeschel, Chris; Pronovost, Peter J; Thompson, David

    2012-01-01

    Despite significant medical advances, cardiac surgery remains a high risk procedure. Sub-optimal work system design characteristics can contribute to the risks associated with cardiac surgery. However, hazards due to work system characteristics have not been identified in the cardiovascular operating room (CVOR) in sufficient detail to guide improvement efforts. The purpose of this study was to identify and categorize hazards (anything that has the potential to cause a preventable adverse patient safety event) in the CVOR. An interdisciplinary research team used prospective hazard identification methods including direct observations, contextual inquiry, and photographing to collect data in 5 hospitals for a total 22 cardiac surgeries. We performed thematic analysis of the qualitative data guided by a work system model. 60 categories of hazards such as practice variations, high workload, non-compliance with evidence-based guidelines, not including clinicians' in medical device purchasing decisions were found. Results indicated that hazards are common in cardiac surgery and should be eliminated or mitigated to improve patient safety. To improve patient safety in the CVOR, efforts should focus on creating a culture of safety, increasing compliance with evidence based infection control practices, improving communication and teamwork, and designing better tools and technologies through partnership among all stakeholders.

  6. Operating room fire prevention: creating an electrosurgical unit fire safety device.

    PubMed

    Culp, William C; Kimbrough, Bradly A; Luna, Sarah; Maguddayao, Aris J

    2014-08-01

    To reduce the incidence of surgical fires. Operating room fires represent a potentially life-threatening hazard and are triggered by the electrosurgical unit (ESU) pencil. Carbon dioxide is a fire suppressant and is a routinely used medical gas. We hypothesize that a shroud of protective carbon dioxide covering the tip of the ESU pencil displaces oxygen, thereby preventing fire ignition. Using 3-dimensional modeling techniques, a polymer sleeve was created and attached to an ESU pencil. This sleeve was connected to a carbon dioxide source and directed the gas through multiple precisely angled ports, generating a cone of fire-suppressive carbon dioxide surrounding the active pencil tip. This device was evaluated in a flammability test chamber containing 21%, 50%, and 100% oxygen with sustained ESU activation. The sleeve was tested with and without carbon dioxide (control) until a fuel was ignited or 30 seconds elapsed. Time to ignition was measured by high-speed videography. Fires were ignited with each control trial (15/15 trials). The control group median ± SD ignition time in 21% oxygen was 3.0 ± 2.4 seconds, in 50% oxygen was 0.1 ± 1.8 seconds, and in 100% oxygen was 0.03 ± 0.1 seconds. No fire was observed when the fire safety device was used in all concentrations of oxygen (0/15 trials; P < 0.0001). The exact 95% confidence interval for absolute risk reduction of fire ignition was 76% to 100%. A sleeve creating a cone of protective carbon dioxide gas enshrouding the sparks from an ESU pencil effectively prevents fire in a high-flammability model. Clinical application of this device may reduce the incidence of operating room fires.

  7. CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONTROL ROOM WITH SPRINKLER SYSTEM CONTROLS, INCLUDING MANUAL CONTROL BOXES FOR THE VENTILATION SYSTEM AND A PLC SWITCH FOR AUTOMATIC CO (CARBON MONOXIDE) SYSTEM. THE AIR TESTING SYSTEM IS FREE STANDING AND THE FANS ARE COMPUTER-OPERATED. - Alaskan Way Viaduct and Battery Street Tunnel, Seattle, King County, WA

  8. Engine Research Building’s Central Control Room

    NASA Image and Video Library

    1948-07-21

    Operators in the Engine Research Building’s Central Control Room at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful collection of compressors and exhausters located in the central portion of the basement provided process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. This photograph was taken just after a major upgrade to the control room in 1948. The panels on the wall contain rudimentary floor plans of the different Engine Research Building sections with indicator lights and instrumentation for each test cell. The process air equipment included 12 exhausters, four compressors, a refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  9. Fire safety in the operating room.

    PubMed

    Rinder, Christine Stowe

    2008-12-01

    Elimination of flammable anesthetic gases has had little effect on operating-room fires except to change their etiology. Electrocautery and lasers, in an oxygen-enriched environment, can ignite even the most fire-resistant materials, including the patient, and the fire triad possibilities in the operating room are nearly limitless. This review will: identify operating room contents capable of acting as ignition/oxidizer/fuel sources, highlight operating room items that are uniquely potent fire triad contributors, and operating room identify settings where fire risk is enhanced by proximity of triad components in time or space. Anesthesiologists are cognizant of the risk of airway surgery fires due to laser ignition of the endotracheal tube and/or its contents. Recently, however, head/neck surgery under monitored anesthesia care has emerged as a high-risk setting for operating room fires; burn injuries represent 20% of monitored anesthesia care-related malpractice claims, 95% of which involved head/neck surgery. Operating room fires are infrequent but catastrophic. Operating room fire prevention depends on: (a)understanding how fire triad elements interact to create a fire, (b) recognizing how standard operating-room equipment, materials, and supplemental oxygen can become one of those elements, and (c) vigilance for circumstances that bring fire triad elements into close proximity.

  10. IET control building (TAN620). control room. facing north. control consoles ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). control room. facing north. control consoles have been removed. Openings in floor were communication and control conduits. Periscope controls at center left (see also HAER No. ID-33-E-20). INEEL negative no. HD-21-3-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  11. Threats to safety during sedation outside of the operating room and the death of Michael Jackson.

    PubMed

    Webster, Craig S; Mason, Keira P; Shafer, Steven L

    2016-03-01

    From an understanding of human psychology and the reliability of high-technology systems, this review considers critical threats to the safety of patients undergoing sedation outside of the operating room, and will stratify these threats along what we define as the 'Patient Risk Continuum'. We then consider interventions suitable for addressing identified risks. The technology, organization and delivery of healthcare continue to become more complex, highlighting the importance of maintaining the safety of patients. Sedation outside of the operating room is known to be associated with higher rates of adverse events. However, a number of recent safety initiatives have shown benefit in improving patient safety. The following threats to patients undergoing sedation, in increasing order of risk, are discussed: equipment and environmental factors, known patient risks, poor team performance, combinatorial problems and egregious violations. To address these threats, we discuss a number of approaches consistent with the systems approach to safety, namely: encouraging functions, forcing functions, cognitive safety nets, information sharing, recovery strategies and regulatory change. Demonstrating improvement with any safety initiative relies critically on quality data collected on the problem area in question.

  12. 75 FR 56972 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts... Factors AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT. ACTION: Notice of...: Background There are roughly 170,000 miles of hazardous liquid pipelines, 295,000 miles of gas transmission...

  13. STS-109 Flight Control Room Photo

    NASA Image and Video Library

    2002-03-05

    JSC2002-00575 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.

  14. STS-109 Flight Control Room Photo

    NASA Image and Video Library

    2002-03-05

    JSC2002-00576 (5 March 2002) --- The members of the STS-109 Orbit 3 Team pose for a group portrait in the shuttle flight control room (WFCR) in Houston’s Mission Control Center (MCC). Flight director Jeff Hanley is visible in the center foreground.

  15. 29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING SOUTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  16. 28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. MAIN CONTROL ROOM, PANELS WEST OF MAIN CONTROL AREA, LOOKING NORTH (LOCATION Q) - Shippingport Atomic Power Station, On Ohio River, 25 miles Northwest of Pittsburgh, Shippingport, Beaver County, PA

  17. Information Foraging in Nuclear Power Plant Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R.L. Boring

    2011-09-01

    nformation foraging theory articulates the role of the human as an 'informavore' that seeks information and follows optimal foraging strategies (i.e., the 'information scent') to find meaningful information. This paper briefly reviews the findings from information foraging theory outside the nuclear domain and then discusses the types of information foraging strategies operators employ for normal and off-normal operations in the control room. For example, operators may employ a predatory 'wolf' strategy of hunting for information in the face of a plant upset. However, during routine operations, the operators may employ a trapping 'spider' strategy of waiting for relevant indicators tomore » appear. This delineation corresponds to information pull and push strategies, respectively. No studies have been conducted to determine explicitly the characteristics of a control room interface that is optimized for both push and pull information foraging strategies, nor has there been empirical work to validate operator performance when transitioning between push and pull strategies. This paper explores examples of control room operators as wolves vs. spiders and con- cludes by proposing a set of research questions to investigate information foraging in control room settings.« less

  18. Human factors aspects of control room design

    NASA Technical Reports Server (NTRS)

    Jenkins, J. P.

    1983-01-01

    A plan for the design and analysis of a multistation control room is reviewed. It is found that acceptance of the computer based information system by the uses in the control room is mandatory for mission and system success. Criteria to improve computer/user interface include: match of system input/output with user; reliability, compatibility and maintainability; easy to learn and little training needed; self descriptive system; system under user control; transparent language, format and organization; corresponds to user expectations; adaptable to user experience level; fault tolerant; dialog capability user communications needs reflected in flexibility, complexity, power and information load; integrated system; and documentation.

  19. Future of operating rooms.

    PubMed

    Reijnen, Michel M P J; Zeebregts, Clark J; Meijerink, Wilhelmus J H J

    2005-01-01

    Operating-room design has not changed significantly since the modern era of surgery began. Minimal invasive, endoscopic, procedures, and evolution of technology will affect operating-room design in the near future. Poor ergonomics has always been one of the major drawbacks of endoscopic surgery. Use of retractable arms and monitors will improve ergonomics of the operating team. Developments in telecommunication will allow surgeons to communicate with colleagues and experts during the procedure in virtually any location around the world, which increases teaching possibilities and procedural safety. Introduction and further development of intraoperative imaging, including real-time, three-dimensional (3-D) reconstructions of patient, and computer-aided surgery offer surgeons the opportunity to train the planned surgical procedure. Moreover, they will improve control and supervision of the procedure in learning situations. The last decade's robotics have made their introduction into the operating rooms. They improve control over the operating-room environment and will facilitate the performance of more complex procedures. However, high costs and lack of force feedback remain its major drawbacks. Improvements of robotic techniques and its implementation into the operating rooms will further guide their design into highly specialized operating units.

  20. Fundamental Use of Surgical Energy (FUSE): An Essential Educational Program for Operating Room Safety

    PubMed Central

    Jones, Stephanie B; Munro, Malcolm G; Feldman, Liane S; Robinson, Thomas N; Brunt, L Michael; Schwaitzberg, Steven D; Jones, Daniel B; Fuchshuber, Pascal R

    2017-01-01

    Operating room (OR) safety has become a major concern in patient safety since the 1990s. Improvement of team communication and behavior is a popular target for safety programming at the institutional level. Despite these efforts, essential safety gaps remain in the OR and procedure rooms. A prime example is the use of energy-based devices in ORs and procedural areas. The lack of fundamental understanding of energy device function, design, and application contributes to avoidable injury and harm at a rate of approximately 1 to 2 per 1000 patients in the US. Hundreds of OR fires occur each year in the US, some causing severe injury and even death. Most of these fires are associated with the use of energy-based surgical devices. In response to this safety issue, the Society of American Gastrointestinal and Endoscopic Surgeons (SAGES) developed the Fundamental Use of Surgical Energy (FUSE) program. This program includes a standardized curriculum targeted to surgeons, other physicians, and allied health care professionals and a psychometrically designed and validated certification test. A successful FUSE certification documents acquisition of the basic knowledge needed to safely use energy-based devices in the OR. By design FUSE fills a void in the curriculum and competency assessment for surgeons and other procedural specialists in the use of energy-based devices in patients. PMID:28241913

  1. A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Boring, Ronald; Joe, Jeffrey

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.« less

  2. 17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. CONTROL ROOM, NORTH SIDE, WITH BRIDGE SWING CONTROLS ON LEFT, SIGNAL CONTROLS ON RIGHT, WHISTLE PULL TOP. RADIO TELEPHONE IN CENTER BACK (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR

  3. 13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. CONTROL ROOM OF GENE PUMPING STATION. CONTROL CUBICLES ARRAYED BEHIND MANAGER'S ART DECO-STYLE CONTROL DESK, WITH CONTROL CUBICLE 1 AT FAR RIGHT AND CONTROL CUBICLE 9 AT FAR LEFT. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  4. Digital Full-Scope Simulation of a Conventional Nuclear Power Plant Control Room, Phase 2: Installation of a Reconfigurable Simulator to Support Nuclear Plant Sustainability

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L. Boring; Vivek Agarwal; Kirk Fitzgerald

    2013-03-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability program has developed a control room simulator in support of control room modernization at nuclear power plants in the U.S. This report highlights the recent completion of this reconfigurable, full-scale, full-scope control room simulator buildout at the Idaho National Laboratory. The simulator is fully reconfigurable, meaning it supports multiple plant models developed by different simulator vendors. The simulator is full-scale, using glasstop virtual panels to display the analog control boards found at current plants. The present installation features 15 glasstop panels, uniquely achieving a complete control room representation. The simulator ismore » also full-scope, meaning it uses the same plant models used for training simulators at actual plants. Unlike in the plant training simulators, the deployment on glasstop panels allows a high degree of customization of the panels, allowing the simulator to be used for research on the design of new digital control systems for control room modernization. This report includes separate sections discussing the glasstop panels, their layout to mimic control rooms at actual plants, technical details on creating a multi-plant and multi-vendor reconfigurable simulator, and current efforts to support control room modernization at U.S. utilities. The glasstop simulator provides an ideal testbed for prototyping and validating new control room concepts. Equally importantly, it is helping create a standardized and vetted human factors engineering process that can be used across the nuclear industry to ensure control room upgrades maintain and even improve current reliability and safety.« less

  5. 49 CFR 195.446 - Control room management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... written control room management procedures that implement the requirements of this section. The procedures... define the roles and responsibilities of a controller during normal, abnormal, and emergency operating... operator must define each of the following: (1) A controller's authority and responsibility to make...

  6. KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee dressed in a "bunny suit," standard clean room apparel, disposes of some waste material into a container designated for the purpose. The apparel is designed to cover the hair, clothing and shoes of employees entering a clean room to prevent particulate matter from contaminating the space flight hardware being stored or processed in the room. The suit and container are both part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  7. Design and implementation of new control room system in Damavand tokamak

    NASA Astrophysics Data System (ADS)

    Rasouli, H.; Zamanian, H.; Gheidi, M.; Kheiri-Fard, M.; Kouhi, A.

    2017-07-01

    The aim of this paper is design and implementation of an up-to-date control room. The previous control room had a lot of constraints and it was not apposite to the sophisticated diagnostic systems as well as to the modern control and multivariable systems. Although it provided the best output for the considered experiments and implementing offline algorithms among all similar plants, it needed to be developed to provide more capability for complex algorithm mechanisms and this work introduces our efforts in this area. Accordingly, four leading systems were designed and implemented, including real-time control system, online Data Acquisition System (DAS), offline DAS, monitoring and data transmission system. In the control system, three real-time control modules were established based on Digital Signal Processor (DSP). Thanks to them, implementation of the classic and linear and nonlinear intelligent controllers was possible to control the plasma position and its elongation. Also, online DAS was constructed in two modules. Using them, voltages and currents of charge for the capacitor banks and pressure of different parts in vacuum vessel were measured and monitored. Likewise, by real-time processing of the online data, the safety protocol of plant performance was accomplished. In addition, the offline DAS was organized in 13 modules based on Field Programmable Gate Array (FPGA). This system can be used for gathering all diagnostic, control, and performance data in 156 channels. Data transmission system and storing mechanism in the server was provided by data transmitting network and MDSplus standard protocol. Moreover, monitoring software was designed so that it could display the required plots for physical analyses. Taking everything into account, this new platform can improve the quality and quantity of research activities in plasma physics for Damavand tokamak.

  8. MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR CONTROL ROOM WITH CONTROL CONSOLE AND STATUS READOUTS ALONG WALL. WORKERS MAKE ELECTRICAL AND OTHER CONNECTIONS. INL NEGATIVE NO. 4289. Unknown Photographer, 2/26/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  9. FRAMEWORK AND APPLICATION FOR MODELING CONTROL ROOM CREW PERFORMANCE AT NUCLEAR POWER PLANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald L Boring; David I Gertman; Tuan Q Tran

    2008-09-01

    This paper summarizes an emerging project regarding the utilization of high-fidelity MIDAS simulations for visualizing and modeling control room crew performance at nuclear power plants. The key envisioned uses for MIDAS-based control room simulations are: (i) the estimation of human error associated with advanced control room equipment and configurations, (ii) the investigative determination of contributory cognitive factors for risk significant scenarios involving control room operating crews, and (iii) the certification of reduced staffing levels in advanced control rooms. It is proposed that MIDAS serves as a key component for the effective modeling of cognition, elements of situation awareness, and riskmore » associated with human performance in next generation control rooms.« less

  10. Design, operation, and safety of single-room interventional MRI suites: practical experience from two centers.

    PubMed

    White, Mark J; Thornton, John S; Hawkes, David J; Hill, Derek L G; Kitchen, Neil; Mancini, Laura; McEvoy, Andrew W; Razavi, Reza; Wilson, Sally; Yousry, Tarek; Keevil, Stephen F

    2015-01-01

    The design and operation of a facility in which a magnetic resonance imaging (MRI) scanner is incorporated into a room used for surgical or endovascular cardiac interventions presents several challenges. MR safety must be maintained in the presence of a much wider variety of equipment than is found in a diagnostic unit, and of staff unfamiliar with the MRI environment, without compromising the safety and practicality of the interventional procedure. Both the MR-guided cardiac interventional unit at Kings College London and the intraoperative imaging suite at the National Hospital for Neurology and Neurosurgery are single-room interventional facilities incorporating 1.5 T cylindrical-bore MRI scanners. The two units employ similar strategies to maintain MR safety, both in original design and day-to-day operational workflows, and between them over a decade of incident-free practice has been accumulated. This article outlines these strategies, highlighting both similarities and differences between the units, as well as some lessons learned and resulting procedural changes made in both units since installation. © 2014 Wiley Periodicals, Inc.

  11. Main Control Room, view to the east. The door to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Main Control Room, view to the east. The door to the motor room is to the right, and the main control cabinets are to the left - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  12. Changes in safety climate and teamwork in the operating room after implementation of a revised WHO checklist: a prospective interventional study.

    PubMed

    Erestam, Sofia; Haglind, Eva; Bock, David; Andersson, Annette Erichsen; Angenete, Eva

    2017-01-01

    Inter-professional teamwork in the operating room is important for patient safety. The World Health Organization (WHO) checklist was introduced to improve intraoperative teamwork. The aim of this study was to evaluate the safety climate in a Swedish operating room setting before and after an intervention, using a revised version of the WHO checklist to improve teamwork. This study is a single center prospective interventional study. Participants were personnel working in operating room teams including surgeons, anesthesiologists, scrub nurses, nurse anaesthetists and nurse assistants. The study started with pre-interventional observations of the WHO checklist use followed by education on safety climate, the WHO checklist, and non-technical skills in the operating room. Thereafter a revised version of the WHO checklist was introduced. Post-interventional observations regarding the performance of the WHO checklist were carried out. The Safety Attitude Questionnaire was used to assess safety climate at baseline and post-intervention. At baseline we discovered a need for improved teamwork and communication. The participants considered teamwork to be important for patient safety, but had different perceptions of good teamwork between professions. The intervention, a revised version of the WHO checklist, did not affect teamwork climate. Adherence to the revision of the checklist was insufficient, dominated by a lack of structure. There was no significant change in teamwork climate by use of the revised WHO checklist, which may be due to insufficient implementation, as a lack of adherence to the WHO checklist was detected. We found deficiencies in teamwork and communication. Further studies exploring how to improve safety climate are needed. NCT02329691.

  13. Integrated intelligent systems in advanced reactor control rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beckmeyer, R.R.

    1989-01-01

    An intelligent, reactor control room, information system is designed to be an integral part of an advanced control room and will assist the reactor operator's decision making process by continuously monitoring the current plant state and providing recommended operator actions to improve that state. This intelligent system is an integral part of, as well as an extension to, the plant protection and control systems. This paper describes the interaction of several functional components (intelligent information data display, technical specifications monitoring, and dynamic procedures) of the overall system and the artificial intelligence laboratory environment assembled for testing the prototype. 10 refs.,more » 5 figs.« less

  14. 10. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Interior view of control room in Components Test Laboratory (T-27), looking east. The control room is located in the center of the building and abuts the Test Cell 8, 9, and 10 and equipment room wings. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  15. Guidelines on ergonomic aspects of control rooms

    NASA Technical Reports Server (NTRS)

    Mitchell, C. M.; Bocast, A. K.; Stewart, L. J.

    1983-01-01

    The anthropometry, workstation design, and environmental design of control rooms are outlined. The automated interface and VDTs and displays and various modes of communication between the system and the human operator using VDTs are discussed. The man in the loop is examined, the single controller single task framework and multiple controller multiple tasks issues are considered.

  16. Verification and Validation of Digitally Upgraded Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boring, Ronald; Lau, Nathan

    2015-09-01

    As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cyclesmore » of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current

  17. Main control room, showing original sixpane windows and doors to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Main control room, showing original six-pane windows and doors to pump motor room at left. The main control cabinets and switchgear, visible on right, were replaced in 2003. View to the south - Wellton-Mohawk Irrigation System, Pumping Plant No. 2, Bounded by Interstate 8 to south, Wellton, Yuma County, AZ

  18. Study About Ceiling Design for Main Control Room of NPP with HFE

    NASA Astrophysics Data System (ADS)

    Gu, Pengfei; Ni, Ying; Chen, Weihua; Chen, Bo; Zhang, Jianbo; Liang, Huihui

    Recently since human factor engineering (HFE) has been used in control room design of nuclear power plant (NPP), the human-machine interface (HMI) has been gradual to develop harmoniously, especially the use of the digital technology. Comparing with the analog technology which was used to human-machine interface in the past, human-machine interaction has been more enhanced. HFE and the main control room (MCR) design engineering of NPP is a combination of multidisciplinary cross, mainly related to electrical and instrument control, reactor, machinery, systems engineering and management disciplines. However, MCR is not only equipped with HMI provided by the equipments, but also more important for the operator to provide a work environment, such as the main control room ceiling. The ceiling design of main control room related to HFE which influences the performance of staff should also be considered in the design of the environment and aesthetic factors, especially the introduction of professional design experience and evaluation method. Based on Ling Ao phase II and Hong Yanhe project implementation experience, the study analyzes lighting effect, space partition, vision load about the ceiling of main control room of NPP. Combining with the requirements of standards, the advantages and disadvantages of the main control room ceiling design has been discussed, and considering the requirements of lightweight, noise reduction, fire prevention, moisture protection, the ceiling design solution of the main control room also has been discussed.

  19. 141. Detail of east control panel in control room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    141. Detail of east control panel in control room, looking east. This panel contains electrical switches that were used to control valves at circular forebay. It also contains voltage regulators, synchroscope adjust field breaker, ammeters, wattmeters, temperature indicator of generator windings, and butterfly valve and governor controls. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  20. Central Control Room in the Engine Research Building

    NASA Image and Video Library

    1968-11-21

    Operators in the Engine Research Building’s Central Control Room at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The massive 4.25-acre Engine Research Building contains dozens of test cells, test stands, and altitude chambers. A powerful a collection of compressors and exhausters located in the central portion of the basement provides process air and exhaust for these test areas. This system is connected to similar process air systems in the laboratory’s other large test facilities. The Central Control Room coordinates this activity and communicates with the local utilities. The panels on the wall contain schematics with indicator lights and instrumentation for the atmospheric exhaust, altitude exhaust, refrigerated air, and process air systems. The process air equipment included twelve exhausters, four compressors, refrigeration system, cooling water, and an exhaust system. The operators in the control room kept in contact with engineers running the process air system and those conducting the tests in the test cells. The operators also coordinated with the local power companies to make sure enough electricity was available to operate the powerful compressors and exhausters.

  1. Control Room Training for the Hyper-X Project Utilizing Aircraft Simulation

    NASA Technical Reports Server (NTRS)

    Lux-Baumann, Jesica; Dees, Ray; Fratello, David

    2006-01-01

    The NASA Dryden Flight Research Center flew two Hyper-X research vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This report describes the technology in the simulation environment and the Mission Control Center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

  2. Control Room Training for the Hyper-X Program Utilizing Aircraft Simulation

    NASA Technical Reports Server (NTRS)

    Lux-Baumann, Jessica R.; Dees, Ray A.; Fratello, David J.

    2006-01-01

    The NASA Dryden Flight Research Center flew two Hyper-X Research Vehicles and achieved hypersonic speeds over the Pacific Ocean in March and November 2004. To train the flight and mission control room crew, the NASA Dryden simulation capability was utilized to generate telemetry and radar data, which was used in nominal and emergency mission scenarios. During these control room training sessions, personnel were able to evaluate and refine data displays, flight cards, mission parameter allowable limits, and emergency procedure checklists. Practice in the mission control room ensured that all primary and backup Hyper-X staff were familiar with the nominal mission and knew how to respond to anomalous conditions quickly and successfully. This paper describes the technology in the simulation environment and the mission control center, the need for and benefit of control room training, and the rationale and results of specific scenarios unique to the Hyper-X research missions.

  3. LOFT. Interior, control room in control building (TAN630). Camera facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    LOFT. Interior, control room in control building (TAN-630). Camera facing north. Sign says "This control console is partially active. Do not operate any switch handle without authorization." Date: May 2004. INEEL negative no. HD-39-14-3 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  4. Control of the Environment in the Operating Room.

    PubMed

    Katz, Jonathan D

    2017-10-01

    There is a direct relationship between the quality of the environment of a workplace and the productivity and efficiency of the work accomplished. Components such as temperature, humidity, ventilation, drafts, lighting, and noise each contribute to the quality of the overall environment and the sense of well-being of those who work there.The modern operating room is a unique workplace with specific, and frequently conflicting, environmental requirements for each of the inhabitants. Even minor disturbances in the internal environment of the operating room can have serious ramifications on the comfort, effectiveness, and safety of each of the inhabitants. A cool, well-ventilated, and dry climate is optimal for many members of the surgical team. Any significant deviation from these objectives raises the risk of decreased efficiency and productivity and adverse surgical outcomes. A warmer, more humid, and quieter environment is necessary for the patient. If these requirements are not met, the risk of surgical morbidity and mortality is increased. An important task for the surgical team is to find the correct balance between these 2 opposed requirements. Several of the components of the operating room environment, especially room temperature and airflow patterns, are easily manipulated by the members of the surgical team. In the following discussion, we will examine these elements to better understand the clinical ramifications of adjustments and accommodations that are frequently made to meet the requirements of both the surgical staff and the patient.

  5. 11. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Historic view of Building 100 control room, showing personnel operating rocket engine test controls and observer watching activity from observation room. May 27, 1957. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-45020. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  6. Documentation of new mission control center White Flight Control Room (FLCR)

    NASA Image and Video Library

    1995-06-06

    Documentation of the new mission control center White Flight Control Room (FLCR). Excellent overall view of White FLCR with personnel manning console workstations (11221). Fisheye lens perspective from Flight Director station with Brian Austin (11222). Environmental (EECOM) workstation and personnel (11223).

  7. Safety in the Preschool.

    ERIC Educational Resources Information Center

    Settles, Mimi

    Guidelines for safety in the cooperative preschool are outlined, emphasizing control of the physical environment to insure maximum freedom for the children compatible with maximum safety. Building standards are set for stairways, rooms, lavatories, parking lots, harmful supplies, and wading pools. Orientation for safety is discussed in regard to…

  8. 140. Detail of north control panel in control room, looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    140. Detail of north control panel in control room, looking north. This panel monitors a variety of activities: gages indicate the level of Lake Tapps and level of the circular forebay; wattmeters indicate output of exciters. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  9. 83. DETAIL OF HONEYWELL AIRCONDITIONING CONTROLS IN SLC3E CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. DETAIL OF HONEYWELL AIR-CONDITIONING CONTROLS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  10. 5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1A, DIRECTORATE OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. "UNDERGROUND CONTROL ROOM AT TEST STAND 1-A, DIRECTORATE OF MISSILE CAPTIVE TEST, EDWARDS AFB, 15 JAN 58, 3097.58." Two men working in the control room. Photo no. "3097 58; G-AFFTC 15 JAN 58, T.S. 1-A Control". - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA

  11. Recommendations to Improve Employee Thermal Comfort When Working in 40°F Refrigerated Cold Rooms.

    PubMed

    Ceballos, Diana; Mead, Kenneth; Ramsey, Jessica

    2015-01-01

    Cold rooms are commonly used for food storage and preparation, and are usually kept around 40°F following food safety guidelines. Some food preparation employees may spend 8 or more hours inside cold rooms. These employees may not be aware of the risks associated with mildly cold temperatures, dampness, and limited ventilation. We performed an evaluation of cold rooms at an airline catering facility because of concerns with exposure to cold temperatures. We spoke with and observed employees in two cold rooms, reviewed daily temperature logs, evaluated employee's physical activity, work/rest schedule, and protective clothing. We measured temperature, percent relative humidity, and air velocities at different work stations inside the cold rooms. We concluded that thermal comfort concerns perceived by cold room employees may have been the result of air drafts at their workstations, insufficient use of personal protective equipment due to dexterity concerns, work practices, and lack of knowledge about good health and safety practices in cold rooms. These moderately cold work conditions with low air velocities are not well covered in current occupational health and safety guidelines, and wind chill calculations do not apply. We provide practical recommendations to improve thermal comfort of cold room employees. Engineering control recommendations include the redesigning of air deflectors and installing of suspended baffles. Administrative controls include the changing out of wet clothing, providing hand warmers outside of cold rooms, and educating employees on cold stress. We also recommended providing more options on personal protective equipment. However, there is a need for guidelines and educational materials tailored to employees in moderately cold environments to improve thermal comfort and minimize health and safety problems.

  12. Recommendations to Improve Employee Thermal Comfort When Working in 40°F Refrigerated Cold Rooms

    PubMed Central

    Ceballos, Diana; Mead, Kenneth; Ramsey, Jessica

    2015-01-01

    Cold rooms are commonly used for food storage and preparation, and are usually kept around 40°F following food safety guidelines. Some food preparation employees may spend 8 or more hours inside cold rooms. These employees may not be aware of the risks associated with mildly cold temperatures, dampness, and limited ventilation. We performed an evaluation of cold rooms at an airline catering facility because of concerns with exposure to cold temperatures. We spoke with and observed employees in two cold rooms, reviewed daily temperature logs, evaluated employee’s physical activity, work/rest schedule, and protective clothing. We measured temperature, percent relative humidity, and air velocities at different work stations inside the cold rooms. We concluded that thermal comfort concerns perceived by cold room employees may have been the result of air drafts at their workstations, insufficient use of personal protective equipment due to dexterity concerns, work practices, and lack of knowledge about good health and safety practices in cold rooms. These moderately cold work conditions with low air velocities are not well covered in current occupational health and safety guidelines, and wind chill calculations do not apply. We provide practical recommendations to improve thermal comfort of cold room employees. Engineering control recommendations include the redesigning of air deflectors and installing of suspended baffles. Administrative controls include the changing out of wet clothing, providing hand warmers outside of cold rooms, and educating employees on cold stress. We also recommended providing more options on personal protective equipment. However, there is a need for guidelines and educational materials tailored to employees in moderately cold environments to improve thermal comfort and minimize health and safety problems. PMID:25961447

  13. Feasibility of touch-less control of operating room lights.

    PubMed

    Hartmann, Florian; Schlaefer, Alexander

    2013-03-01

    Today's highly technical operating rooms lead to fairly complex surgical workflows where the surgeon has to interact with a number of devices, including the operating room light. Hence, ideally, the surgeon could direct the light without major disruption of his work. We studied whether a gesture tracking-based control of an automated operating room light is feasible. So far, there has been little research on control approaches for operating lights. We have implemented an exemplary setup to mimic an automated light controlled by a gesture tracking system. The setup includes a articulated arm to position the light source and an off-the-shelf RGBD camera to detect the user interaction. We assessed the tracking performance using a robot-mounted hand phantom and ran a number of tests with 18 volunteers to evaluate the potential of touch-less light control. All test persons were comfortable with using the gesture-based system and quickly learned how to move a light spot on flat surface. The hand tracking error is direction-dependent and in the range of several centimeters, with a standard deviation of less than 1 mm and up to 3.5 mm orthogonal and parallel to the finger orientation, respectively. However, the subjects had no problems following even more complex paths with a width of less than 10 cm. The average speed was 0.15 m/s, and even initially slow subjects improved over time. Gestures to initiate control can be performed in approximately 2 s. Two-thirds of the subjects considered gesture control to be simple, and a majority considered it to be rather efficient. Implementation of an automated operating room light and touch-less control using an RGBD camera for gesture tracking is feasible. The remaining tracking error does not affect smooth control, and the use of the system is intuitive even for inexperienced users.

  14. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  15. 11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  16. 3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. OBLIQUE VIEW OF THE PRESENT CONTROL ROOM (ORIGINALLY THE TRANSFORMER ROOM). - Washington Water Power Company Post Falls Power Plant, Middle Channel Powerhouse & Dam, West of intersection of Spokane & Fourth Streets, Post Falls, Kootenai County, ID

  17. Maximum performance synergy: A new approach to recording studio control room design

    NASA Astrophysics Data System (ADS)

    Szymanski, Jeff D.

    2003-10-01

    Popular recording studio control room designs include LEDE(tm), RFZ(tm), and nonenvironment rooms. The common goal of all of these is to create an accurate acoustical environment that does not distort or otherwise color audio reproduction. Also common to these designs is the frequent need to have multiple ancillary recording rooms, often adjacent to the main control room, where group members perform. This approach, where group members are physically separated from one another, can lead to lack of ensemble in the finished recordings. New twists on old acoustical treatment techniques have been implemented at a studio in Nashville, Tennessee, which minimize the need for multiple ancillary recording rooms, thus creating an environment where talent, producer and recording professionals can all occupy the same space for maximum performance synergy. Semi-separated performance areas are designed around a central, critical listening area. The techniques and equipment required to achieve this separation are reviewed, as are advantages and disadvantages to this new control room design approach.

  18. 5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW, SHOWING A CONTROL ROOM INSIDE THE RADIOGRAPHY ROOM; PASS-THROUGH FOR EXPOSED FILM ON RIGHT - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI

  19. Closed-Loop Acoustic Control of Reverberant Room for Satellite Environmental Testing

    NASA Astrophysics Data System (ADS)

    Janssens, Karl; Bianciardi, Fabio; Sabbatini, Danilo; Debille, Jan; Carrella, Alex

    2012-07-01

    The full satellite acoustic test is an important milestone in a satellite launch survivability verification campaign. This test is required to verify the satellite’s mechanical design against the high-level acoustic loads induced by the launch vehicle during the atmospheric flight. During the test, the satellite is subjected to a broadband diffuse acoustic field, reproducing the pressure levels observed during launch. The excitation is in most cases provided by a combination of horns for the low frequencies and noise generators for the higher frequencies. Acoustic control tests are commonly performed in reverberant rooms, controlling the sound pressure levels in third octave bands over the specified target spectrum. This paper discusses an automatic feedback control system for acoustic control of large reverberation rooms for satellite environmental testing. The acoustic control system consists of parallel third octave PI (Proportional Integral) feedback controllers that take the reverberation characteristics of the room into consideration. The drive output of the control system is shaped at every control step based on the comparison of the average third octave noise spectrum, measured from a number of microphones in the test room, with the target spectrum. Cross-over filters split the output drive into band- limited signals to feed each of the horns. The control system is realized in several steps. In the first phase, a dynamic process model is developed, including the non-linear characteristics of the horns and the reverberant properties of the room. The model is identified from dynamic experiments using system identification techniques. In the next phase, an adequate control strategy is designed which is capable of reaching the target spectrum in the required time period without overshoots. This control strategy is obtained from model-in-the-loop (MIL) simulations, evaluating the performance of various potential strategies. Finally, the proposed strategy is

  20. VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0’, LOOKING WEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF PDP CONTROL ROOM PANELS, LEVEL 0’, LOOKING WEST. THESE PANELS WERE WHERE THE A-MOTOR TAPES WOULD HAVE BEEN VISIBLE IN THE CONTROL ROOM. MORE RECENT MONITOR IN UPPER CENTER FOR “LTR FLUX MONITORS” - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  1. IET. Control room in control building (TAN620). Terminal panels for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET. Control room in control building (TAN-620). Terminal panels for instrumentation wiring. Note alarm horn and emergency light at right edge of view. Cable reel comes from Collier, Pawtucket, RI. Date: February 1955. INEEL negative no. 55-362 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  2. Western Aeronautical Test Range (WATR) mission control Blue room

    NASA Image and Video Library

    1994-12-05

    Mission control Blue Room, seen here, in building 4800 at NASA's Dryden Flight Research Center, is part of the Western Aeronautical Test Range (WATR). All aspects of a research mission are monitored from one of two of these control rooms at Dryden. The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests, corridors are provided for low, medium, and high-altitude supersonic flight, and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada.

  3. Western Aeronautical Test Range (WATR) mission control Gold room

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Mission control Gold room is seen here, located at the Dryden Flight Research Center of the Western Aeronautical Test Range (WATR). All aspects of a research mission are monitored from one of two of these control rooms at Dryden. The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests, corridors are provided for low, medium, and high-altitude supersonic flight, and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada.

  4. PBF Control Building (PER619). Interior detail of control room's severe ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior detail of control room's severe fuel damage instrument panel. Indicators provided real-time information about test underway in PBF reactor. Note audio speaker. Date: May 2004. INEEL negative no, HD-41-7-4 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  5. 2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. CONTROL ROOM INTERIOR, CONSOLE AND MONITORS. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA

  6. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  7. White Paper for Virtual Control Room

    NASA Technical Reports Server (NTRS)

    Little, William; Tully-Hanson, Benjamin

    2015-01-01

    The Virtual Control Room (VCR) Proof of Concept (PoC) project is the result of an award given by the Fourth Annual NASA T&I Labs Challenge Project Call. This paper will outline the work done over the award period to build and enhance the capabilities of the Augmented/Virtual Reality (AVR) Lab at NASA's Kennedy Space Center (KSC) to create the VCR.

  8. 30 CFR 56.4531 - Flammable or combustible liquid storage buildings or rooms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 56.4531 Flammable or...) In addition, the buildings or rooms shall be— (1) Constructed to meet a fire resistance rating of at...

  9. Wide angle view of the Flight control room of Mission control center

    NASA Image and Video Library

    1984-10-06

    Wide angle view of the flight control room (FCR) of the Mission Control Center (MCC). Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.

  10. CRITICALITY SAFETY CONTROLS AND THE SAFETY BASIS AT PFP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kessler, S

    2009-04-21

    With the implementation of DOE Order 420.1B, Facility Safety, and DOE-STD-3007-2007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities', a new requirement was imposed that all criticality safety controls be evaluated for inclusion in the facility Documented Safety Analysis (DSA) and that the evaluation process be documented in the site Criticality Safety Program Description Document (CSPDD). At the Hanford site in Washington State the CSPDD, HNF-31695, 'General Description of the FH Criticality Safety Program', requires each facility develop a linking document called a Criticality Control Review (CCR) to document performance of these evaluations. Chapter 5,more » Appendix 5B of HNF-7098, Criticality Safety Program, provided an example of a format for a CCR that could be used in lieu of each facility developing its own CCR. Since the Plutonium Finishing Plant (PFP) is presently undergoing Deactivation and Decommissioning (D&D), new procedures are being developed for cleanout of equipment and systems that have not been operated in years. Existing Criticality Safety Evaluations (CSE) are revised, or new ones written, to develop the controls required to support D&D activities. Other Hanford facilities, including PFP, had difficulty using the basic CCR out of HNF-7098 when first implemented. Interpretation of the new guidelines indicated that many of the controls needed to be elevated to TSR level controls. Criterion 2 of the standard, requiring that the consequence of a criticality be examined for establishing the classification of a control, was not addressed. Upon in-depth review by PFP Criticality Safety staff, it was not clear that the programmatic interpretation of criterion 8C could be applied at PFP. Therefore, the PFP Criticality Safety staff decided to write their own CCR. The PFP CCR provides additional guidance for the evaluation team to use by clarifying the evaluation criteria in DOE-STD-3007

  11. Unlocking the Locker Room.

    ERIC Educational Resources Information Center

    St. Clair, Dean

    1996-01-01

    Discusses locker-room design standards and common challenges when complying with the Americans with Disabilities Act. Accessibility and safety considerations for shower, toilet, and locker areas are addressed, as are entrance vestibules, drying and grooming areas, and private dressing rooms. (GR)

  12. Changing Operating Room Culture: Implementation of a Postoperative Debrief and Improved Safety Culture.

    PubMed

    Magill, Stephen T; Wang, Doris D; Rutledge, W Caleb; Lau, Darryl; Berger, Mitchel S; Sankaran, Sujatha; Lau, Catherine Y; Imershein, Sarah G

    2017-11-01

    Patient safety is foundational to neurosurgical care. Postprocedural "debrief" checklists have been proposed to improve patient safety, but data about their use in neurosurgery are limited. Here, we implemented an initiative to routinely perform postoperative debriefs and evaluated the impact of debriefing on operating room (OR) safety culture. A 10-question safety attitude questionnaire (SAQ) was sent to neurosurgical OR staff at a major academic medical center before and 18 months after the implementation of a postoperative debriefing initiative. Rates of debrief compliance and changes in attitudes before and after the survey were evaluated. The survey used a Likert scale and analyzed with standard statistical methods. After the debrief initiative, the rate of debriefing increased from 51% to 86% of cases for the neurosurgery service. Baseline SAQ responses found that neurosurgeons had a more favorable perception of OR safety than did anesthesiologists and nurses. After implementation of the postoperative debriefing process, perceptions of OR safety significantly improved for neurosurgeons, anesthesiologists, and nurses. Furthermore, the disparity between nurses and surgeons was no longer significant. After debrief implementation, neurosurgical OR staff had improved perceptions of patient safety compared with surgical services that did not commonly perform debriefing. Debriefing identified OR efficiency concerns in 26.9% of cases, and prevention of potential adverse events/near misses was reported in 8% of cases. Postoperative debriefing can be effectively introduced into the OR and improves the safety culture after implementation. Debriefing is an effective tool to identify OR inefficiencies and potential adverse events. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. 10. Credit BG. Interior of control and observation room at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Credit BG. Interior of control and observation room at Control and Recording Center Building 4221/E-22. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  14. Baseline Study Methodology for Future Phases of Research on Nuclear Power Plant Control Room Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya Lee; Bower, Gordon Ross; Hill, Rachael Ann

    In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator

  15. Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boring, Ronald L.; Joe, Jeffrey C.

    2015-02-01

    For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intendedmore » to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.« less

  16. Label Design Affects Medication Safety in an Operating Room Crisis: A Controlled Simulation Study.

    PubMed

    Estock, Jamie L; Murray, Andrew W; Mizah, Margaret T; Mangione, Michael P; Goode, Joseph S; Eibling, David E

    2018-06-01

    Several factors contribute to medication errors in clinical practice settings, including the design of medication labels. The objective of this study was to quantify the impact of label design on medication safety in a realistic, high-stress clinical situation. Ninety-six anesthesia trainee participants were randomly assigned to either the redesigned or the current label condition. Participants were blinded to the study's focus on medication label design and their assigned label condition. Each participant was the sole anesthesia provider in a simulated operating room scenario involving an unexpected vascular injury. The surgeon asked the participant to administer hetastarch to the simulated patient because of hemodynamic instability. The fluid drawer of the anesthesia cart contained three 500-ml intravenous bags of hetastarch and one 500-ml intravenous bag of lidocaine. We hypothesized that redesigned labels would help participants correctly select hetastarch from the cart. If the participants incorrectly selected lidocaine from the cart, we hypothesized that the redesigned labels would help participants detect the lidocaine before administration. The percentage of participants who correctly selected hetastarch from the cart was significantly higher for the redesigned labels than the current labels (63% versus 40%; odds ratio, 2.61 [95% confidence interval, 1.1-6.1]; P = 0.03). Of the participants who incorrectly selected lidocaine from the cart, the percentage who detected the lidocaine before administration did not differ by label condition. The redesigned labels helped participants correctly select hetastarch from the cart, thus preventing some potentially catastrophic medication errors from reaching the simulated patient.

  17. Priority coding for control room alarms

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    Indicating the priority of a spatially fixed, activated alarm tile on an alarm tile array by a shape coding at the tile, and preferably using the same shape coding wherever the same alarm condition is indicated elsewhere in the control room. The status of an alarm tile can change automatically or by operator acknowledgement, but tones and/or flashing cues continue to provide status information to the operator.

  18. ETR CONTROL BUILDING, TRA647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ETR CONTROL BUILDING, TRA-647, INTERIOR. CONTROL ROOM, CONTEXTUAL VIEW. INSTRUMENT PANELS AT REAR OF OPERATOR'S CONSOLE GAVE OPERATOR STATUS OF REACTOR PERFORMANCE, COOLANT-WATER CHARACTERISTICS AND OTHER INDICATORS. WINDOWS AT RIGHT LOOKED INTO ETR BUILDING FIRST FLOOR. CAMERA FACING EAST. INL NEGATIVE NO. HD42-6. Mike Crane, Photographer, 3/2004 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  19. TRITIUM LABORATORY, TRA666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    TRITIUM LABORATORY, TRA-666, INTERIOR. MAIN FLOOR. CONTROL ROOM ENCLOSURE AT CENTER OF VIEW. SIGN ABOVE DOOR SAYS "HYDRAULIC TEST FACILITY CONTROL ROOM." SIGN IN WINDOW SAYS "EATING AREA." "EVACUATION AND EMERGENCY INFORMATION" IS POSTED ON CABINET AT LEFT OF VIEW. INL NEGATIVE NO. HD30-2-3. Mike Crane, Photographer, 6/2001 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  20. Durable improvements in efficiency, safety, and satisfaction in the operating room.

    PubMed

    Heslin, Martin J; Doster, Barbara E; Daily, Sandra L; Waldrum, Michael R; Boudreaux, Arthur M; Smith, A Blair; Peters, Glenn; Ragan, Debbie B; Buchalter, Scott; Bland, Kirby I; Rue, Loring W

    2008-05-01

    Enhanced productivity and efficiency in the operating room must be balanced with patient safety and staff satisfaction. In December 2004, transition to an expanded replacement hospital resulted in mandatory overtime, unpredictable work hours, and poor morale among operating room (OR) staff. A staff-retention crisis resulted, which threatened the viability of the OR and the institution. We report the changes implemented to efficiently deliver safe patient care in a supportive environment for surgeons and OR staff. University of Alabama at Birmingham University Hospital OR data were evaluated for fiscal year 2004 and compared with fiscal years 2005 and 2006. Case volumes, number of operational ORs, and on-time case starts were evaluated. OR adverse events were tabulated. Percentage of registered nurse hires and staff departures served as a proxy for staff satisfaction. Short, intermediate, and longterm strategies were implemented by an engaged OR management committee with the guidance of surgical, anesthesia, and hospital leadership. These included new block time release policies; use of traveling nurses until new staff could be hired and trained; and incentive-based, voluntary, employee-scheduled overtime. Mandatory nursing education time was blocked weekly. Enforcement of the National Patient Safety Goals were implemented and adjudicated with a "surgeon-of-the-day" system providing backup for nurse management. We demonstrated an increase in operations per year, on-time starts, and registered nurse hires in fiscal years 2005 and 2006. During this same time, we were able to markedly decrease the number of adverse events, admitting delays, and staff departures. Change is difficult to accept but essential when vital clinical activities are impaired and at risk. To maintain important clinical environments like the OR in an academic center, we developed and implemented effective, data-driven changes. This allowed us to retain critical human resources and restore a

  1. 11. Credit BG. Interior of control and observation room at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Credit BG. Interior of control and observation room at Control and Recording Center, showing detail of switchboard and closed circuit television monitors. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  2. 5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR VIEW OF UPPER LEVEL ROOM OF THE CONTROL HOUSE LOCATED ON THE SOUTH END OF BIG TUJUNGA DAM SHOWING THE CONTROL PANEL. - Big Tujunga Dam, Control House, 809 West Big Tujunga Road, Sunland, Los Angeles County, CA

  3. Instituting a filtration/pressurization system to reduce dust concentrations in a control room at a mineral processing plant

    PubMed Central

    Noll, J.; Cecala, A.; Hummer, J.

    2016-01-01

    The National Institute for Occupational Safety and Health has observed that many control rooms and operator compartments in the U.S. mining industry do not have filtration systems capable of maintaining low dust concentrations in these areas. In this study at a mineral processing plant, to reduce respirable dust concentrations in a control room that had no cleaning system for intake air, a filtration and pressurization system originally designed for enclosed cabs was modified and installed. This system was composed of two filtering units: one to filter outside air and one to filter and recirculate the air inside the control room. Eighty-seven percent of submicrometer particles were reduced by the system under static conditions. This means that greater than 87 percent of respirable dust particles should be reduced as the particle-size distribution of respirable dust particles is greater than that of submicrometer particles, and filtration systems usually are more efficient in capturing the larger particles. A positive pressure near 0.02 inches of water gauge was produced, which is an important component of an effective system and minimizes the entry of particles, such as dust, into the room. The intake airflow was around 118 cfm, greater than the airflow suggested by the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) for acceptable indoor air quality. After one year, the loading of the filter caused the airflow to decrease to 80 cfm, which still produces acceptable indoor air quality. Due to the loading of the filters, the reduction efficiency for submicrometer particles under static conditions increased to 94 percent from 87 percent. PMID:26834293

  4. 37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. ENGINE ROOM, FROM PORT SIDE OF CONTROL CONSOLE, LOOKING TOWARDS STERN, PORT ENGINE AT RIGHT, STARBOARD ENGINE AT LEFT, BOTH ARE DIESEL ENGINES, IN BACKGROUND IS STAIRS UP TO CREWS' BERTHING, BEYONE THE STAIRS IS THE DOOR TO AFT ENGINE ROOM & MACHINE SHOP. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA

  5. 49. Environmental equipment room, cbr filter at left, ventilation control ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Environmental equipment room, cbr filter at left, ventilation control panel in center, brine chiller controls at right, looking southeast - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  6. Efficacy, efficiency and safety aspects of hydrogen peroxide vapour and aerosolized hydrogen peroxide room disinfection systems.

    PubMed

    Fu, T Y; Gent, P; Kumar, V

    2012-03-01

    This was a head-to-head comparison of two hydrogen-peroxide-based room decontamination systems. To compare the efficacy, efficiency and safety of hydrogen peroxide vapour (HPV; Clarus R, Bioquell, Andover, U.K.) and aerosolized hydrogen peroxide (aHP; SR2, Sterinis, now supplied as Glosair, Advanced Sterilization Products (ASP), Johnson & Johnson Medical Ltd, Wokingham, U.K.) room disinfection systems. Efficacy was tested using 4- and 6-log Geobacillus stearothermophilus biological indicators (BIs) and in-house prepared test discs containing approximately 10(6) meticillin-resistant Staphylococcus aureus (MRSA), Clostridium difficile and Acinetobacter baumannii. Safety was assessed by detecting leakage of hydrogen peroxide using a hand-held detector. Efficiency was assessed by measuring the level of hydrogen peroxide using a hand-held sensor at three locations inside the room, 2 h after the start of the cycles. HPV generally achieved a 6-log reduction, whereas aHP generally achieved less than a 4-log reduction on the BIs and in-house prepared test discs. Uneven distribution was evident for the aHP system but not the HPV system. Hydrogen peroxide leakage during aHP cycles with the door unsealed, as per the manufacturer's operating manual, exceeded the short-term exposure limit (2 ppm) for more than 2 h. When the door was sealed with tape, as per the HPV system, hydrogen peroxide leakage was <1 ppm for both systems. The mean concentration of hydrogen peroxide in the room 2 h after the cycle started was 1.3 [standard deviation (SD) 0.4] ppm and 2.8 (SD 0.8) ppm for the four HPV and aHP cycles, respectively. None of the readings were <2 ppm for the aHP cycles. The HPV system was safer, faster and more effective for biological inactivation. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  7. Measuring Human Performance in Simulated Nuclear Power Plant Control Rooms Using Eye Tracking

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, Casey Robert; Rice, Brandon Charles; Bower, Gordon Ross

    Control room modernization will be an important part of life extension for the existing light water reactor fleet. As part of modernization efforts, personnel will need to gain a full understanding of how control room technologies affect performance of human operators. Recent advances in technology enables the use of eye tracking technology to continuously measure an operator’s eye movement, which correlates with a variety of human performance constructs such as situation awareness and workload. This report describes eye tracking metrics in the context of how they will be used in nuclear power plant control room simulator studies.

  8. 11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF MECHANICAL ROOM. VIEW TO SOUTHEAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  9. 12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF GENERATOR ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  10. 21. Interior view of citric acid air pollution control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Interior view of citric acid air pollution control room (also known as scrubber room) in Components Test Laboratory (T-27), looking southeast. Photograph shows upgraded instrumentation, piping, tanks, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  11. Music in the operating room: is it a safety hazard?

    PubMed

    Shambo, Lyda; Umadhay, Tony; Pedoto, Alessia

    2015-02-01

    Noise is a health hazard and a source of stress, and it impairs concentration and communication. Since 1960, hospital noise levels have risen around the world. Nowhere in the healthcare setting is noise more prevalent than in the operating room (OR). The genetic makeup of humans does not evolve at the rate of technology. Noise exposure, sensory overload, and the capacity to adapt without physical and psychological consequences are absent from the human condition. The World Health Organization has recognized environmental noise as harmful pollution that causesadverse effects on health. Although noise in the OR is unavoidable, music is a choice. The purpose of this literature review is to provide further insight into the ramifications of the presence of music in the OR, evaluate its appropriateness in relation to care and safety for the patient and staff, and provide information for future research.

  12. Controlling allergens in animal rooms by using curtains.

    PubMed

    Krohn, Thomas C; Itter, Gabi; Fosse, Richard; Hansen, Axel K

    2006-05-01

    The reduction and control of allergens in the animal facility is important for staff working with laboratory animals. This study was designed to evaluate the efficiency of perforated Makrolon curtains in front of racks as a method to reduce the amount of allergen in the animal room. The experimental situation we studied provides some information regarding allergen disposition in animal rooms but is clearly artificial and does not reflect a typical, 'real-world' environment in terms of preventing exposure of workers to allergens. Plastic curtains with holes were placed in front of racks, and a corridor between the racks and a curtain was present. The room was ventilated with air, which was blown into the room through the middle of the corridor, flowing downstream and passing through the holes in the curtain. This set-up resulted in air flow from the corridor through the curtain. Air samples were collected from sites in the corridor and behind the curtain. The samples were analyzed for the allergen Mus m1, and the amount of allergen was calculated. The results show air flow from the aisle through the holes in the curtains and through the racks behind the curtains, and this flow keeps allergen behind the curtains and prevents its spread from the cages into the aisle. The present study shows that the use of curtains in front of the cage racks is an efficient way to prevent spread of allergens from rodent cages to the entire animal room.

  13. Assessing patient safety culture in Tunisian operating rooms: A multicenter study.

    PubMed

    Mallouli, Manel; Tlili, Mohamed Ayoub; Aouicha, Wiem; Ben Rejeb, Mohamed; Zedini, Chekib; Salwa, Amrani; Mtiraoui, Ali; Ben Dhiab, Mohamed; Ajmi, Thouraya

    2017-04-01

    To assess the patient safety culture (PSC) in operating rooms (ORs) and to determine influencing factors. A cross-sectional descriptive multicenter study which was conducted over a period of 7 months (October 2014-April 2015) using the French validated version of the Hospital Survey On Patient Safety Culture questionnaire. Of the note, 15 ORs of public and private healthcare institutions. In total, there were 368 participants including surgeons, anesthesiologists, surgical and anesthesia technicians, nurses and caregivers, divided into 316 professionals exercising in public sector and 52 working in private one. A self-administrated questionnaire investigating 10 dimensions of PSC (including 45 items), two items examining the staff perception of patient safety quality and reporting events, and five items regarding demographic characteristics of respondents. The participation rate in the study was 70.8%. All 10 dimensions were to be improved. The overall perception of patient safety had a score of 34.9%. The dimension that had the lowest score (20.5%) was the non-punitive response to error, and the one that had the highest score (41.67%) was teamwork in the ORs. Three dimensions were developed in private sector, and none in public hospitals. This study showed that the level of the PSC needs to be improved not only in public hospitals but also in private ones. The obtained results highlight the importance of implementing quality management systems and developing PSC. © The Author 2017. Published by Oxford University Press in association with the International Society for Quality in Health Care. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  14. 14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. GENE PUMPING STATION CONTROL ROOM AS SEEN FROM MAIN STATION MANAGER'S CONTROL DESK. ELECTRICAL CONTROL INDICATORS AND CONTROLS FOR REGULATING ELECTRICITY INTO PLANT AS WELL AS SYNCHRONIZING STARTUP OF PUMPS. - Gene Pump Plant, South of Gene Wash Reservoir, 2 miles west of Whitsett Pump Plant, Parker Dam, San Bernardino County, CA

  15. 12. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO TAPE EQUIPMENT AND VOICE INTERCOM EQUIPMENT. THE MONITORS ABOVE GLASS WALL DISPLAY UNDERWATER TEST VIDEO TO CONTROL ROOM. FARTHEST CONSOLE ROW CONTAINS CAMERA SWITCHING, PANNING, TILTING, FOCUSING, AND ZOOMING. MIDDLE CONSOLE ROW CONTAINS TEST CONDUCTOR CONSOLES FOR MONITORING TEST ACTIVITIES AND DATA. THE CLOSEST CONSOLE ROW IS NBS FACILITY CONSOLES FOR TEST DIRECTOR, SAFETY AND QUALITY ASSURANCE REPRESENTATIVES. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL

  16. 13. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. NBS LOWER ROOM. BEHIND FAR GLASS WALL IS VIDEO TAPE EQUIPMENT AND VOICE INTERCOM EQUIPMENT. THE MONITORS ABOVE GLASS WALL DISPLAY UNDERWATER TEST VIDEO TO CONTROL ROOM. FARTHEST CONSOLE ROW CONTAINS CAMERA SWITCHING, PANNING, TILTING, FOCUSING, AND ZOOMING. MIDDLE CONSOLE ROW CONTAINS TEST CONDUCTOR CONSOLES FOR MONITORING TEST ACTIVITIES AND DATA. THE CLOSEST CONSOLE ROW IS NBC FACILITY CONSOLES FOR TEST DIRECTOR, SAFETY AND QUALITY ASSURANCE REPRESENTATIVES. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL

  17. 11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. CONTROL ROOM INTERIOR, SHOWING SEVERAL PERISCOPES. Looking north along west wall. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  18. Method of installing a control room console in a nuclear power plant

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1994-01-01

    An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

  19. Human-factors engineering control-room design review/audit: Waterford 3 SES Generating Station, Louisiana Power and Light Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Savage, J.W.

    1983-03-10

    A human factors engineering design review/audit of the Waterford-3 control room was performed at the site on May 10 through May 13, 1982. The report was prepared on the basis of the HFEB's review of the applicant's Preliminary Human Engineering Discrepancy (PHED) report and the human factors engineering design review performed at the site. This design review was carried out by a team from the Human Factors Engineering Branch, Division of Human Factors Safety. The review team was assisted by consultants from Lawrence Livermore National Laboratory (University of California), Livermore, California.

  20. 7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. CONTROL AND EQUIPMENT ROOM INTERIOR. Looking to southwest corner and entrance to cable tunnel. - Edwards Air Force Base, South Base Sled Track, Firing Control Blockhouse, South of Sled Track at east end, Lancaster, Los Angeles County, CA

  1. [Controlling systems for operating room managers].

    PubMed

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  2. 6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. UNDERGROUND FIRING CONTROL ROOM, INTERIOR. Looking southeast to escape tunnel. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  3. 20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF WASTE TREATMENT CONTROL ROOM IN BUILDING 374. THE BUILDING 371/374 COMPLEX WAS DESIGNED TO EMPHASIZE AUTOMATICALLY CONTROLLED, REMOTELY OPERATED PROCESSES. (1/80) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO

  4. Swedish translation and psychometric testing of the safety attitudes questionnaire (operating room version).

    PubMed

    Göras, Camilla; Wallentin, Fan Yang; Nilsson, Ulrica; Ehrenberg, Anna

    2013-03-19

    Tens of millions of patients worldwide suffer from avoidable disabling injuries and death every year. Measuring the safety climate in health care is an important step in improving patient safety. The most commonly used instrument to measure safety climate is the Safety Attitudes Questionnaire (SAQ). The aim of the present study was to establish the validity and reliability of the translated version of the SAQ. The SAQ was translated and adapted to the Swedish context. The survey was then carried out with 374 respondents in the operating room (OR) setting. Data was received from three hospitals, a total of 237 responses. Cronbach's alpha and confirmatory factor analysis (CFA) was used to evaluate the reliability and validity of the instrument. The Cronbach's alpha values for each of the factors of the SAQ ranged between 0.59 and 0.83. The CFA and its goodness-of-fit indices (SRMR 0.055, RMSEA 0.043, CFI 0.98) showed good model fit. Intercorrelations between the factors safety climate, teamwork climate, job satisfaction, perceptions of management, and working conditions showed moderate to high correlation with each other. The factor stress recognition had no significant correlation with teamwork climate, perception of management, or job satisfaction. Therefore, the Swedish translation and psychometric testing of the SAQ (OR version) has good construct validity. However, the reliability analysis suggested that some of the items need further refinement to establish sound internal consistency. As suggested by previous research, the SAQ is potentially a useful tool for evaluating safety climate. However, further psychometric testing is required with larger samples to establish the psychometric properties of the instrument for use in Sweden.

  5. A field demonstration of energy conservation using occupancy sensor lighting control in equipment rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dagle, J.E.

    1992-09-01

    The Pacific Northwest Laboratory identified energy savings potential of automatic equipment-room lighting controls, which was demonstrated by the field experiment described in this report. Occupancy sensor applications have gained popularity in recent years due to improved technology that enhances reliability and reduces cost. Automatic lighting control using occupancy sensors has been accepted as an energy-conservation measure because it reduces wasted lighting. This study focused on lighting control for equipment rooms, which have inherent conditions ideal for automatic lighting control, i.e., an area which is seldom occupied, multiple users of the area who would not know if others are in themore » room when they leave, and high lighting energy intensity in the area. Two rooms were selected for this study: a small equipment room in the basement of the 337 Building, and a large equipment area in the upper level of the 329 Building. The rooms were selected to demonstrate the various degrees of complexity which may be encountered in equipment rooms throughout the Hanford Site. The 337 Building equipment-room test case demonstrated a 97% reduction in lighting energy consumption, with an annual energy savings of $184. Including lamp-replacement savings, a total savings of $306 per year is offset by an initial installation cost of $1,100. The installation demonstrates a positive net present value of $2,858 when the lamp-replacement costs are included in a life-cycle analysis. This also corresponds to a 4.0-year payback period. The 329 Building equipment-room installation resulted in a 92% reduction in lighting energy consumption. This corresponds to annual energy savings of $1,372, and a total annual savings of $2,104 per year including lamp-replacement savings. The life-cycle cost analysis shows a net present value of $15,855, with a 5.8-year payback period.« less

  6. Proteus DSA control room in Mojave, CA

    NASA Image and Video Library

    2003-04-03

    Proteus DSA control room in Mojave, CA (L to R) Jean-Pierre Soucy; Amphitech International Software engineer Craig Bomben; NASA Dryden Test Pilot Pete Siebold; (with headset, at computer controls) Scaled Composites pilot Bob Roehm; New Mexico State University (NMSU) UAV Technical Analysis Application Center (TAAC) Chuck Coleman; Scaled Composites Pilot Kari Sortland; NMSU TAAC Russell Wolfe; Modern Technology Solutions, Inc. Scaled Composites' unique tandem-wing Proteus was the testbed for a series of UAV collision-avoidance flight demonstrations. An Amphitech 35GHz radar unit installed below Proteus' nose was the primary sensor for the Detect, See and Avoid tests.

  7. Safety Control and Safety Education at Technical Institutes

    NASA Astrophysics Data System (ADS)

    Iino, Hiroshi

    The importance of safety education for students at technical institutes is emphasized on three grounds including safety of all working members and students in their education, research and other activities. The Kanazawa Institute of Technology re-organized the safety organization into a line structure and improved safety minds of all their members and now has a chemical materials control system and a set of compulsory safety education programs for their students, although many problems still remain.

  8. 3. Credit BG. The interior of the control room appears ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Credit BG. The interior of the control room appears in this view, looking north (0°). The control console in the room center permitted remote control of various propellant grinders and mixers in surrounding buildings. Television monitors (absent from their mounts in this view) permitted direct viewing of operating machinery. From foreground to background: Panel (1) contains OGAR warning light switches for Curing Buildings E-39, E-40, E-41 and E-86; (O=off, G=green safe, A=amber caution, R=red danger) Panel (2) E-85 Oxidizer Dryer Building console: OGAR switch Panel (3) E-84 Oxidizer Grinder Building console: controls for vibrator, feed, and hammer; Panel (4) E-36 Oxidizer Grinder Building console: controls for vibrator, feed, hammer, attritor, and SWECO ("SWECO" undefined) Panels (5) & (6) blank Panel (7) E-38 Mixer & Casting Building console: vacuum pump, blender, heating and cooling controls Panel (8) E-37 Mixer & Casting Building console: motor controls for 1 pint, 1 gallon, 5 gallon and 30 gallon mixers; vacuum pump, deluge (fire suppression), pot up/down, vibrator, feed, and SWECO. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA

  9. Benefits of Advanced Control Room Technologies: Phase One Upgrades to the HSSL, Research Plan, and Performance Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Joe, Jeffrey; Rice, Brandon

    Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digitalmore » modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control room. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes the initial upgrades to the HSSL and outlines the methodology for a pilot test of the HSSL configuration.« less

  10. 17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. DETAIL INTERIOR VIEW OF CONTROL ROOM ON LEVEL +77 OF POWERHOUSE #1; NOTEBOOKS IN FOREGROUND ARE ON TOP OF THE NEW SWITCH GEAR CONTROL CONSOLE; THE ORIGINAL OPERATOR DESK IS IN CENTER; THE ORIGINAL BENCH BOARD CONTROLS ARE IN BACKGROUND. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  11. Mission Operations Control Room (MOCR) activities during STS-6 mission

    NASA Image and Video Library

    1983-04-05

    Astronauts Roy D. Bridges (left) and RIchard O. Covey serve as spacecraft communicators (CAPCOM) for STS-6. They are seated at the CAPCOM console in the mission operations control room (MOCR) of JSC's mission control center (30119); Flight Director Jay H. Greene communicates with a nearby flight controller in the MOCR just after launch of the Challenger (30120).

  12. 8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, CONTROL AND INSTRUMENTATION ROOM. Looking southwest toward entrance and inner blast door. - Edwards Air Force Base, South Base Sled Track, Firing & Control Blockhouse for 10,000-foot Track, South of Sled Track at midpoint of 20,000-foot track, Lancaster, Los Angeles County, CA

  13. WTEC monograph on instrumentation, control and safety systems of Canadian nuclear facilities

    NASA Technical Reports Server (NTRS)

    Uhrig, Robert E.; Carter, Richard J.

    1993-01-01

    This report updates a 1989-90 survey of advanced instrumentation and controls (I&C) technologies and associated human factors issues in the U.S. and Canadian nuclear industries carried out by a team from Oak Ridge National Laboratory (Carter and Uhrig 1990). The authors found that the most advanced I&C systems are in the Canadian CANDU plants, where the newest plant (Darlington) has digital systems in almost 100 percent of its control systems and in over 70 percent of its plant protection system. Increased emphasis on human factors and cognitive science in modern control rooms has resulted in a reduced workload for the operators and the elimination of many human errors. Automation implemented through digital instrumentation and control is effectively changing the role of the operator to that of a systems manager. The hypothesis that properly introducing digital systems increases safety is supported by the Canadian experience. The performance of these digital systems has been achieved using appropriate quality assurance programs for both hardware and software development. Recent regulatory authority review of the development of safety-critical software has resulted in the creation of isolated software modules with well defined interfaces and more formal structure in the software generation. The ability of digital systems to detect impending failures and initiate a fail-safe action is a significant safety issue that should be of special interest to nuclear utilities and regulatory authorities around the world.

  14. 27. Pump Room interiorDrainage pump motor control center with main ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Pump Room interior-Drainage pump motor control center with main valve control panel at right. - Hunters Point Naval Shipyard, Drydock No. 4, East terminus of Palou Avenue, San Francisco, San Francisco County, CA

  15. Clifford Charlesworth seated at his console in Mission Control Room

    NASA Image and Video Library

    1968-12-21

    S68-55742 (21 Dec. 1968) --- Clifford E. Charlesworth, Apollo 8 "Green Team" flight director, is seated at his console in the Mission Operations Control Room in the Mission Control Center, Building 30, during the launch of the Apollo 8 (Spacecraft 103/Saturn 503) manned lunar orbit space mission.

  16. Comprehensive Surgical Coaching Enhances Surgical Skill in the Operating Room: A Randomized Controlled Trial.

    PubMed

    Bonrath, Esther M; Dedy, Nicolas J; Gordon, Lauren E; Grantcharov, Teodor P

    2015-08-01

    The aim of the study was to determine whether individualized coaching improved surgical technical skill in the operating room to a higher degree than current residency training. Clinical training in the operating room is a valuable opportunity for surgeons to acquire skill and knowledge; however, it often remains underutilized. Coaching has been successfully used in various industries to enhance performance, but its role in surgery has been insufficiently investigated. This randomized controlled trial was conducted at one surgical training program. Trainees undergoing a minimally invasive surgery rotation were randomized to either conventional training (CT) or comprehensive surgical coaching (CSC). CT included ward and operating room duties, and regular departmental teaching sessions. CSC comprised performance analysis, debriefing, feedback, and behavior modeling. Primary outcome measures were technical performance as measured on global and procedure-specific rating scales, and surgical safety parameters, measured by error count. Operative performance was assessed by blinded video analysis of the first and last cases recorded by the participants during their rotation. Twenty residents were randomized and 18 completed the study. At posttraining the CSC group (n = 9) scored significantly higher on a procedure-specific skill scale compared with the CT group (n = 9) [median, 3.90 (interquartile range, 3.68-4.30) vs 3.60 (2.98-3.70), P = 0.017], and made fewer technical errors [10 (7-13) vs 18 (13-21), P = 0.003]. Significant within-group improvements for all skill metrics were only noted in the CSC group. Comprehensive surgical coaching enhances surgical training and results in skill acquisition superior to conventional training.

  17. 8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LAUNCH CONTROL SUPPORT BUILDING. INTERIOR OF DINING/RECREATION ROOM. VIEW TO EAST. - Minuteman III ICBM Launch Control Facility November-1, 1.5 miles North of New Raymer & State Highway 14, New Raymer, Weld County, CO

  18. 12. Historic view of Building 100 control room, showing television ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Historic view of Building 100 control room, showing television monitoring of tests and personnel operating rocket engine test controls. May 27, 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-45021. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  19. Altitude Wind Tunnel Control Room at the Aircraft Engine Research Laboratory

    NASA Image and Video Library

    1944-07-21

    Operators in the control room for the Altitude Wind Tunnel at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory remotely operate a Wright R–3350 engine in the tunnel’s test section. Four of the engines were used to power the B–29 Superfortress, a critical weapon in the Pacific theater during World War II. The wind tunnel, which had been in operation for approximately six months, was the nation’s only wind tunnel capable of testing full-scale engines in simulated altitude conditions. The soundproof control room was used to operate the wind tunnel and control the engine being run in the test section. The operators worked with assistants in the adjacent Exhauster Building and Refrigeration Building to manage the large altitude simulation systems. The operator at the center console controlled the tunnel’s drive fan and operated the engine in the test section. Two sets of pneumatic levers near his right forearm controlled engine fuel flow, speed, and cooling. Panels on the opposite wall, out of view to the left, were used to manage the combustion air, refrigeration, and exhauster systems. The control panel also displayed the master air speed, altitude, and temperature gauges, as well as a plethora of pressure, temperature, and airflow readings from different locations on the engine. The operator to the right monitored the manometer tubes to determine the pressure levels. Despite just being a few feet away from the roaring engine, the control room remained quiet during the tests.

  20. The development and application of electronic information system for safety administration of newborns in the rooming-in care.

    PubMed

    Wang, Fang; Dong, Jian-Cheng; Chen, Jian-Rong; Wu, Hui-Qun; Liu, Man-Hua; Xue, Li-Ly; Zhu, Xiang-Hua; Wang, Jian

    2015-01-01

    To independently research and develop an electronic information system for safety administration of newborns in the rooming-in care, and to investigate the effects of its clinical application. By VS 2010 SQL SERVER 2005 database and adopting Microsoft visual programming tool, an interactive mobile information system was established, with integrating data, information and knowledge with using information structures, information processes and information technology. From July 2011 to July 2012, totally 210 newborns from the rooming-in care of the Obstetrics Department of the Second Affiliated Hospital of Nantong University were chosen and randomly divided into two groups: the information system monitoring group (110 cases) and the regular monitoring group (100 cases). Incidence of abnormal events and degree of satisfaction were recorded and calculated. ① The wireless electronic information system has four main functions including risk scaling display, identity recognition display, nursing round notes board and health education board; ② statistically significant differences were found between the two groups both on the active or passive discovery rate of abnormal events occurred in the newborns (P<0.05) and the satisfaction degree of the mothers and their families (P<0.05); ③ the system was sensitive and reliable, and the wireless transmission of information was correct and safety. The system is with high practicability in the clinic and can ensure the safety for the newborns with improved satisfactions.

  1. 14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. WrightPatterson ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR VIEW OF PROPELLER STAND CONTROL ROOM. - Wright-Patterson Air Force Base, Area B, Building No. 20A, Propeller Test Complex, Seventh Street, from E to G Streets, Dayton, Montgomery County, OH

  2. 16. View of Building 100 control room. 1987. On file ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View of Building 100 control room. 1987. On file at NASA Glenn Research Center, Cleveland, Ohio. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  3. Sound-field reproduction in-room using optimal control techniques: simulations in the frequency domain.

    PubMed

    Gauthier, Philippe-Aubert; Berry, Alain; Woszczyk, Wieslaw

    2005-02-01

    This paper describes the simulations and results obtained when applying optimal control to progressive sound-field reproduction (mainly for audio applications) over an area using multiple monopole loudspeakers. The model simulates a reproduction system that operates either in free field or in a closed space approaching a typical listening room, and is based on optimal control in the frequency domain. This rather simple approach is chosen for the purpose of physical investigation, especially in terms of sensing microphones and reproduction loudspeakers configurations. Other issues of interest concern the comparison with wave-field synthesis and the control mechanisms. The results suggest that in-room reproduction of sound field using active control can be achieved with a residual normalized squared error significantly lower than open-loop wave-field synthesis in the same situation. Active reproduction techniques have the advantage of automatically compensating for the room's natural dynamics. For the considered cases, the simulations show that optimal control results are not sensitive (in terms of reproduction error) to wall absorption in the reproduction room. A special surrounding configuration of sensors is introduced for a sensor-free listening area in free field.

  4. [Nursing professionals and health care assistants' perception of patient safety culture in the operating room].

    PubMed

    Bernalte-Martí, Vicente; Orts-Cortés, María Isabel; Maciá-Soler, Loreto

    2015-01-01

    To assess nursing professionals and health care assistants' perceptions, opinions and behaviours on patient safety culture in the operating room of a public hospital of the Spanish National Health Service. To describe strengths and weaknesses or opportunities for improvement according to the Agency for Healthcare Research and Quality criteria, as well as to determine the number of events reported. A descriptive, cross-sectional study was conducted using the Spanish version of the questionnaire Hospital Survey on Patient Safety Culture. The sample consisted of nursing professionals, who agreed to participate voluntarily in this study and met the selection criteria. A descriptive and inferential analysis was performed depending on the nature of the variables and the application conditions of statistical tests. Significance if p < .05. In total, 74 nursing professionals responded (63.2%). No strengths were found in the operating theatre, and improvements are needed concerning staffing (64.0%), and hospital management support for patient safety (52.9%). A total of 52.3% (n = 65) gave patient safety a score from 7 to 8.99 (on a 10 point scale); 79.7% (n = 72) reported no events last year. The total variance explained by the regression model was 0.56 for "Frequency of incident reporting" and 0.26 for "Overall perception of safety". There was a more positive perception of patient safety culture at unit level. Weaknesses have been identified, and they can be used to design specific intervention activities to improve patient safety culture in other nearby operating theatres. Copyright © 2014 Elsevier España, S.L.U. All rights reserved.

  5. Engineers and technicians in the control room at the Dryden Flight Research Center must constantly monitor critical operations and checks during research projects like NASA's hypersonic X-43A

    NASA Image and Video Library

    2004-01-24

    Engineers and technicians in the control room at the Dryden Flight Research Center must constantly monitor critical operations and checks during research projects like NASA's hypersonic X-43A. Visible in the photo, taken two days before the X-43's captive carry flight in January 2004, are [foreground to background]; Tony Kawano (Range Safety Officer), Brad Neal (Mission Controller), and Griffin Corpening (Test Conductor).

  6. 133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. NITROGEN SUPPLY PANEL ON SOUTH WALL OF CONTROL ROOM (114), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  7. 143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    143. MOBILE HIGH PRESSURE NITROGEN CART STORED IN CONTROL ROOM (214), LSB (BLDG. 751) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  8. 137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    137. VALVES ON SOUTH WALL OF LIQUID NITROGEN CONTROL ROOM (115), LSB (BLDG. 770) - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  9. 11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA

  10. 40 CFR 1601.12 - Public reading room.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Public reading room. 1601.12 Section 1601.12 Protection of Environment CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD PROCEDURES FOR DISCLOSURE OF RECORDS UNDER THE FREEDOM OF INFORMATION ACT Administration § 1601.12 Public reading room. (a) The CSB maintains a public reading room that...

  11. 40 CFR 1601.12 - Public reading room.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Public reading room. 1601.12 Section 1601.12 Protection of Environment CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD PROCEDURES FOR DISCLOSURE OF RECORDS UNDER THE FREEDOM OF INFORMATION ACT Administration § 1601.12 Public reading room. (a) The CSB maintains a public reading room that...

  12. 40 CFR 1601.12 - Public reading room.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Public reading room. 1601.12 Section 1601.12 Protection of Environment CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD PROCEDURES FOR DISCLOSURE OF RECORDS UNDER THE FREEDOM OF INFORMATION ACT Administration § 1601.12 Public reading room. (a) The CSB maintains a public reading room that...

  13. 40 CFR 1601.12 - Public reading room.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Public reading room. 1601.12 Section 1601.12 Protection of Environment CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD PROCEDURES FOR DISCLOSURE OF RECORDS UNDER THE FREEDOM OF INFORMATION ACT Administration § 1601.12 Public reading room. (a) The CSB maintains a public reading room that...

  14. 40 CFR 1601.12 - Public reading room.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Public reading room. 1601.12 Section 1601.12 Protection of Environment CHEMICAL SAFETY AND HAZARD INVESTIGATION BOARD PROCEDURES FOR DISCLOSURE OF RECORDS UNDER THE FREEDOM OF INFORMATION ACT Administration § 1601.12 Public reading room. (a) The CSB maintains a public reading room that...

  15. NFL Films music scoring stage and control room space

    NASA Astrophysics Data System (ADS)

    Berger, Russ; Schrag, Richard C.; Ridings, Jason J.

    2003-04-01

    NFL Films' new 200,000 sq. ft. corporate headquarters is home to an orchestral scoring stage used to record custom music scores to support and enhance their video productions. Part of the 90,000 sq. ft. of sound critical technical space, the music scoring stage and its associated control room are at the heart of the audio facilities. Driving the design were the owner's mandate for natural light, wood textures, and an acoustical environment that would support small rhythm sections, soloists, and a full orchestra. Being an industry leader in cutting-edge video and audio formats, the NFLF required that the technical spaces allow the latest in technology to be continually integrated into the infrastructure. Never was it more important for a project to hold true to the adage of ``designing from the inside out.'' Each audio and video space within the facility had to stand on its own with regard to user functionality, acoustical accuracy, sound isolation, noise control, and monitor presentation. A detailed look at the architectural and acoustical design challenges encountered and the solutions developed for the performance studio and the associated control room space will be discussed.

  16. 68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    68. TURBINE HALL, LOOKING DOWN FROM THE CONTROL ROOM INTO TURBINE HALL AT UNITS 3, 5, AND 2) - Delaware County Electric Company, Chester Station, Delaware River at South end of Ward Street, Chester, Delaware County, PA

  17. 11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. VIEW LOOKING EAST AT MODEL AIRCRAFT CONTROL ROOM; MODEL OF BOEING 737 AT TOP OF PHOTOGRAPH IN FULL-SCALE WIND TUNNEL. - NASA Langley Research Center, Full-Scale Wind Tunnel, 224 Hunting Avenue, Hampton, Hampton, VA

  18. 15. Interior view of unoccupied controlled computer room looking at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Interior view of unoccupied controlled computer room looking at exit door and office; northwest corner of unoccupied portion; view to south. - Ellsworth Air Force Base, Mess & Administration Building, 2279 Risner Drive, Blackhawk, Meade County, SD

  19. Va-Room: Motorcycle Safety.

    ERIC Educational Resources Information Center

    Keller, Rosanne

    One of a series of instructional materials produced by the Literacy Council of Alaska, this booklet provides information about motorcycle safety. Using a simplified vocabulary and shorter sentences, it offers statistics concerning motorcycle accidents; information on how to choose the proper machine; basic information about the operation of the…

  20. Railing for safety: job demands, job control, and safety citizenship role definition.

    PubMed

    Turner, Nick; Chmiel, Nik; Walls, Melanie

    2005-10-01

    This study investigated job demands and job control as predictors of safety citizenship role definition, that is, employees' role orientation toward improving workplace safety. Data from a survey of 334 trackside workers were framed in the context of R. A. Karasek's (1979) job demands-control model. High job demands were negatively related to safety citizenship role definition, whereas high job control was positively related to this construct. Safety citizenship role definition of employees with high job control was buffered from the influence of high job demands, unlike that of employees with low job control, for whom high job demands were related to lower levels of the construct. Employees facing both high job demands and low job control were less likely than other employees to view improving safety as part of their role orientation. Copyright (c) 2005 APA, all rights reserved.

  1. 5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. VIEW TO SOUTH IN CONTROL ROOM ABOVE PUMP CHAMBER, SHOWING PUMP MOTOR AND STEEL BULKHEADS IN FLOOR FOR ACCESS TO PUMPS - Providence Sewage Treatment System, Reservoir Avenue Pumping Station, Reservoir & Pontiac Avenues, Providence, Providence County, RI

  2. 8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. INTERIOR, FIRE ALARM CONTROL ROOM (NORTH OF MAIN GARAGE), FROM ENTRYWAY, LOOKING NORTH, SHOWING ADDITIONAL 'GAMEWELL' FIRE ALARM SYSTEMS. - Oakland Naval Supply Center, Firehouse, East of Fourth Street, between A & B Streets, Oakland, Alameda County, CA

  3. 24 CFR 3280.109 - Room requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Planning Considerations § 3280.109 Room requirements. (a) Every manufactured home shall have at least one living area with not less than 150 sq. ft. of gross floor area. (b) Rooms designed for sleeping purposes shall have a minimum gross square foot floor...

  4. 30. Perimeter acquisition radar building room #318, showing radar control. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Perimeter acquisition radar building room #318, showing radar control. Console and line printers - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  5. 114. WEST SIDE OF LIQUID OXYGEN CONTROL ROOM (205). LIQUID ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    114. WEST SIDE OF LIQUID OXYGEN CONTROL ROOM (205). LIQUID NITROGEN (LN2) SUBCOOLER ON LEFT; SKID 8, LIQUID OXYGEN CONTROLLER FOR SWITCHING BETWEEN RAPID-LOAD AND TOPPING ON RIGHT. LIQUID OXYGEN LINE FROM SKID 9A AT RIGHT EDGE OF PHOTO. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. 46 CFR 62.25-15 - Safety control systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....35-50. Note: Safety control systems include automatic and manual safety trip controls and automatic... engines. (e) Automatic safety trip control systems must— (1) Be provided where there is an immediate... 46 Shipping 2 2011-10-01 2011-10-01 false Safety control systems. 62.25-15 Section 62.25-15...

  7. 18. Historic plan of Building 100 control room. March 21, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Historic plan of Building 100 control room. March 21, 1956. NASA GRC drawing number CE-101736. (On file at NASA Glenn Research Center). - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  8. Mental workload measurement in operator control room using NASA-TLX

    NASA Astrophysics Data System (ADS)

    Sugarindra, M.; Suryoputro, M. R.; Permana, A. I.

    2017-12-01

    The workload, encountered a combination of physical workload and mental workload, is a consequence of the activities for workers. Central control room is one department in the oil processing company, employees tasked with monitoring the processing unit for 24 hours nonstop with a combination of 3 shifts in 8 hours. NASA-TLX (NASA Task Load Index) is one of the subjective mental workload measurement using six factors, namely the Mental demand (MD), Physical demand (PD), Temporal demand (TD), Performance (OP), Effort (EF), frustration levels (FR). Measurement of a subjective mental workload most widely used because it has a high degree of validity. Based on the calculation of the mental workload, there at 5 units (DTU, NPU, HTU, DIST and OPS) at the control chamber (94; 83.33; 94.67; 81, 33 and 94.67 respectively) that categorize as very high mental workload. The high level of mental workload on the operator in the Central Control Room is a requirement to have high accuracy, alertness and can make decisions quickly

  9. INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    INTERIOR OF SECOND FLOOR CONTROL ROOM OF FUEL STORAGE BUILDING (CPP-603). PHOTO TAKEN LOOKING SOUTHWEST. INL PHOTO NUMBER HD-54-19-2. Mike Crane, Photographer, 8/2005 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  10. IET control building (TAN620). interior room. sign says, "emergency equipment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). interior room. sign says, "emergency equipment for metal fires." INEEL negative no. HD-21-1-2 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  11. 14. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Historic view of engineer in Building 100 control room examining data printout. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46210. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. 13. Historic view of Building 100 control room, showing personnel ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Historic view of Building 100 control room, showing personnel with data recording instrumentation. 1957. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-46211. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. 28. SONAR CONTROL ROOM FORWARD LOOKING AFT SHOWING AN/SQS23G ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. SONAR CONTROL ROOM - FORWARD LOOKING AFT SHOWING AN/SQS-23G DETECTING-RANGING SET, MARK & CONTROL PANEL, CAN-55134 RECORDER, SPEED INDICATOR, VARIOUS ALARMS AND INTERNAL COMMUNICATION CIRCUITS. - U.S.S. HORNET, Puget Sound Naval Shipyard, Sinclair Inlet, Bremerton, Kitsap County, WA

  14. Quantitative safety assessment of air traffic control systems through system control capacity

    NASA Astrophysics Data System (ADS)

    Guo, Jingjing

    Quantitative Safety Assessments (QSA) are essential to safety benefit verification and regulations of developmental changes in safety critical systems like the Air Traffic Control (ATC) systems. Effectiveness of the assessments is particularly desirable today in the safe implementations of revolutionary ATC overhauls like NextGen and SESAR. QSA of ATC systems are however challenged by system complexity and lack of accident data. Extending from the idea "safety is a control problem" in the literature, this research proposes to assess system safety from the control perspective, through quantifying a system's "control capacity". A system's safety performance correlates to this "control capacity" in the control of "safety critical processes". To examine this idea in QSA of the ATC systems, a Control-capacity Based Safety Assessment Framework (CBSAF) is developed which includes two control capacity metrics and a procedural method. The two metrics are Probabilistic System Control-capacity (PSC) and Temporal System Control-capacity (TSC); each addresses an aspect of a system's control capacity. And the procedural method consists three general stages: I) identification of safety critical processes, II) development of system control models and III) evaluation of system control capacity. The CBSAF was tested in two case studies. The first one assesses an en-route collision avoidance scenario and compares three hypothetical configurations. The CBSAF was able to capture the uncoordinated behavior between two means of control, as was observed in a historic midair collision accident. The second case study compares CBSAF with an existing risk based QSA method in assessing the safety benefits of introducing a runway incursion alert system. Similar conclusions are reached between the two methods, while the CBSAF has the advantage of simplicity and provides a new control-based perspective and interpretation to the assessments. The case studies are intended to investigate the

  15. 15. Historic view of engineer in Building 100 control room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Historic view of engineer in Building 100 control room examining data printout. August 28, 1962. On file at NASA Plumbrook Research Facility, Sandusky, Ohio. NASA photo number C-61500. - Rocket Engine Testing Facility, GRC Building No. 100, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  16. Human Factors Engineering Aspects of Modifications in Control Room Modernization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hugo, Jacques; Clefton, Gordon; Joe, Jeffrey

    This report describes the basic aspects of control room modernization projects in the U.S. nuclear industry and the need for supplementary guidance on the integration of human factors considerations into the licensing and regulatory aspects of digital upgrades. The report pays specific attention to the integration of principles described in NUREG-0711 (Human Factors Engineering Program Review Model) and how supplementary guidance can help to raise general awareness in the industry regarding the complexities of control room modernization projects created by many interdependent regulations, standards and guidelines. The report also describes how human factors engineering principles and methods provided by variousmore » resources and international standards can help in navigating through the process of licensing digital upgrades. In particular, the integration of human factors engineering guidance and requirements into the process of licensing digital upgrades can help reduce uncertainty related to development of technical bases for digital upgrades that will avoid the introduction of new failure modes.« less

  17. 149. SOUTHEAST CORNER OF FUEL CONTROL ROOM (215), LSB (BLDG. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    149. SOUTHEAST CORNER OF FUEL CONTROL ROOM (215), LSB (BLDG. 751), WITH SKID 2 IN FOREGROUND; FUEL LINE TO LAUNCH VEHICLE ENTERING WALL ON LEFT BEHIND SKID 2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  18. 144. VIEW OF EAST WALL OF CONTROL ROOM (214), LSB ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    144. VIEW OF EAST WALL OF CONTROL ROOM (214), LSB (BLDG. 751). PNEUMATIC SUPPLY PANEL ON LEFT; NITROGEN AND HELIUM PIPING AT TOP; PURGE PANEL AT BOTTOM OF PHOTOGRAPH. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  19. VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  20. Innovative Patient Room Lighting System with Integrated Spectrally Adaptive Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maniccia, Dorene A.; Rizzo, Patricia; Kim, James

    In December of 2013, the U.S. Department of Energy’s SSL R&D Program released a Funding Opportunity Announcement (FOA), that for the first time, contained opportunities for comprehensive application-specific system development. The FOA included opportunities for two applications, one of which was a Patient Room. Philips Lighting Research North America, submitted a proposal for the Patient Room application, and was selected for the complete project award. The award amount was for $497,127, with a Philips Research co-funding commitment 165,709 dollars. The total project value was 662,836 dollars. This project sought to redefine lighting for the patient room application. The goal wasmore » to deliver an innovative LED patient suite (patient room and bathroom) lighting system solution that was 40% more energy-efficient than traditional fluorescent incumbent technologies, and would meet all the visual and non-visual needs of patients, caregivers and visitors, and improve the patient experience. State-of-the-art multichannel LED platforms and control technologies that would provide spectral tuning and become part of an intelligent, connected lighting system drove the solution. The project was scoped into four main task areas that included a) System Concept Creation, b) Identification of the Luminaire Portfolio, c) Development of the Connected Lighting Infrastructure, and d) System Performance Validation. Each of the four main tasks were completed and validated extensively over the course the 2 ½ year project. The system concept was created by first developing a lighting design that demonstrated best practices for patient room lighting – illuminance and uniformity for task performance, reduced glare, and convenient controls, in addition to giving patients control over the lighting in their environment. A framework was defined to deliver circadian support via software behaviors. Through that process luminaires were identified from the Philips portfolio that were

  1. ATV Engineering Support Team Safety Console Preparation for the Johannes Kepler Mission

    NASA Astrophysics Data System (ADS)

    Chase, R.; Oliefka, L.

    2010-09-01

    This paper describes the improvements to be implemented in the Safety console position of the Engineering Support Team(EST) at the Automated Transfer Vehicle(ATV) Control Centre(ATV-CC) for the upcoming ATV Johannes Kepler mission. The ATV missions to the International Space Station are monitored and controlled from the ATV-CC in Toulouse, France. The commanding of ATV is performed by the Vehicle Engineering Team(VET) in the main control room under authority of the Flight Director. The EST performs a monitoring function in a room beside the main control room. One of the EST positions is the Safety console, which is staffed by safety engineers from ESA and the industrial prime contractor, Astrium. The function of the Safety console is to check whether the hazard controls are available throughout the mission as required by the Hazard Reports approved by the ISS Safety Review Panel. Safety console preparation activities were limited prior to the first ATV mission due to schedule constraints, and the safety engineers involved have been working to improve the readiness for ATV 2. The following steps have been taken or are in process, and will be described in this paper: • review of the implementation of Operations Control Agreement Documents(OCADs) that record the way operational hazard controls are performed to meet the needs of the Hazard Reports(typically in Flight Rules and Crew Procedures), • crosscheck of operational control needs and implementations with respect to ATV's first flight observations and post flight evaluations, with a view to identifying additional, obsolete or revised operational hazard controls, • participation in the Flight Rule review and update process carried out between missions, • participation in the assessment of anomalies observed during the first ATV mission, to ensure that any impacts are addressed in the ATV 2 safety documentation, • preparation of a Safety console handbook to provide lists of important safety aspects to be

  2. The application of a "6S Lean" initiative to improve workflow for emergency eye examination rooms.

    PubMed

    Nazarali, Samir; Rayat, Jaspreet; Salmonson, Hilary; Moss, Theodora; Mathura, Pamela; Damji, Karim F

    2017-10-01

    Ophthalmology residents on call at the Royal Alexandra Hospital identified workplace disorganization and lack of standardization in emergency eye examination rooms as an impediment to efficient patient treatment. The aim of the study was to use the "6S Lean" model to improve workflow in eye examination rooms at the Royal Alexandra Hospital. With the assistance of quality improvement consultants, the "6S Lean" model was applied to the current operation of the emergency eye clinic examination rooms. This model, considering 8 waste categories, was then used to recommend and implement changes to the examination rooms and to workplace protocols to enhance efficiency and safety. Eye examination rooms were improved with regards to setup, organization of supplies, inventory control, and maintenance. All targets were achieved, and the 5S audit checklist score increased by 33 points from 44 to 77. Implementation of the 6S methodology is a simple approach that removes inefficiencies from the workplace. The ophthalmology clinic removed waste from all 8 waste categories, increased audit results, mitigated patient and resident safety risks, and ultimately redirected resident time back to patient care delivery. Copyright © 2017 Canadian Ophthalmological Society. Published by Elsevier Inc. All rights reserved.

  3. [Does ultraclean air in the operating room provide greater safety?].

    PubMed

    van Tiel, Frank H; Buiting, Anton G; Meessen, Nico E L; Voss, Andreas; Vos, Margreet C

    2010-01-01

    The Dutch quality control plan for climatisation of the operating room (OR), which was published in 2005, describes the management and maintenance of the air conditioning system. This management plan proposes a standard for air quality in class 1 ORs. This has been adopted by the Dutch Orthopaedic Society, but not by other surgical societies. The British study which underlies the proposed norm for air quality in class 1 ORs, a study on the infection preventive effect of ultraclean air, dates from 1982 and is inadequately controlled for prophylactic use of antibiotics. Antibiotic prophylaxis in itself already reduces the number of surgical site infections.-More recent studies fail to show an infection preventive effect of ultraclean air in the OR. The Dutch Working Party for Infection Prevention (WIP) ought to take the initiative, together with the medical Scientific Societies and the Society of Infection Prevention and Control in the health care setting (VHIG), to establish enforceable norms for microbiological air quality and to set criteria as to which types of operations are allowed to be performed in which class of OR.

  4. 7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. CONSTRUCTION PROGRESS VIEW (INTERIOR) OF CONTROL ROOM PANEL INSIDE BUNKER. SHOWS OPENING TO CABLE CHASE, FOUR PULLEY DEVICES, POWER OUTLET, CONDUIT, AND EAST END WALL OF BUNKER. INEL PHOTO NUMBER 65-5441, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  5. Care in a birth room versus a conventional setting: a controlled trial.

    PubMed Central

    Klein, M; Papageorgiou, A; Westreich, R; Spector-Dunsky, L; Elkins, V; Kramer, M S; Gelfand, M M

    1984-01-01

    A controlled clinical trial was carried out to assess whether a birth room setting would influence the care of mothers and newborns. Of the 163 low-risk women enrolled, 49 (30%) manifested some prenatal risk and were excluded. The remaining 114 were allocated by strict alternation to a birth room or a conventional setting. Of the 56 women allocated to the birth room, 63% of the primiparas and 19% of the multiparas were later transferred. The numbers in the two settings who had oxytocin stimulation, epidural anesthesia, forceps delivery or cesarean section did not show statistically significant differences. The episiotomy rates were slightly lower in the birth room than in the conventional setting, and the rates of an intact perineum were higher in the birth room. Neither the Apgar scores nor the morbidity rates of the infants showed statistically significant differences related to the setting to which the mother had been allocated, although more infants from the conventional setting were admitted to a special care unit. Both "experimental" groups of women less often received routine perineal shaving, enemas or intravenous infusions than did an obstetrically similar nonexperimental comparison group. Despite the apparent inability in this setting for the birth room to influence the rate of major obstetric procedures (except for episiotomy) and outcomes, the authors believe that a birth room is desirable in tertiary care centres as well as in community hospitals. PMID:6388776

  6. Effectiveness of in-room air filtration and dilution ventilation for tuberculosis infection control.

    PubMed

    Miller-Leiden, S; Lobascio, C; Nazaroff, W W; Macher, J M

    1996-09-01

    Tuberculosis (TB) is a public health problem that may pose substantial risks to health care workers and others. TB infection occurs by inhalation of airborne bacteria emitted by persons with active disease. We experimentally evaluated the effectiveness of in-room air filtration systems, specifically portable air filters (PAFs) and ceiling-mounted air filters (CMAFs), in conjunction with dilution ventilation, for controlling TB exposure in high-risk settings. For each experiment, a test aerosol was continuously generated and released into a full-sized room. With the in-room air filter and room ventilation system operating, time-averaged airborne particle concentrations were measured at several points. The effectiveness of in-room air filtration plus ventilation was determined by comparing particle concentrations with and without device operation. The four PAFs and three CMAFs we evaluated reduced room-average particle concentrations, typically by 30% to 90%, relative to a baseline scenario with two air-changes per hour of ventilation (outside air) only. Increasing the rate of air flow recirculating through the filter and/or air flow from the ventilation did not always increase effectiveness. Concentrations were generally higher near the emission source than elsewhere in the room. Both the air flow configuration of the filter and its placement within the room were important, influencing room air flow patterns and the spatial distribution of concentrations. Air filters containing efficient, but non-high efficiency particulate air (HEPA) filter media were as effective as air filters containing HEPA filter media.

  7. Effectiveness of In-Room Air Filtration and Dilution Ventilation for Tuberculosis Infection Control.

    PubMed

    Miller-Leiden, S; Lohascio, C; Nazaroff, W W; Macher, J M

    1996-09-01

    Tuberculosis (TB) is a public health problem that may pose substantial risks to health care workers and others. TB infection occurs by inhalation of airborne bacteria emitted by persons with active disease. We experimentally evaluated the effectiveness of in-room air filtration systems, specifically portable air filters (PAFs) and ceiling-mounted air filters (CMAFs), in conjunction with dilution ventilation, for controlling TB exposure in high-risk settings. For each experiment, a test aerosol was continuously generated and released into a full-sized room. With the in-room air filter and room ventilation system operating, time-averaged airborne particle concentrations were measured at several points. The effectiveness of in-room air filtration plus ventilation was determined by comparing particle concentrations with and without device operation. The four PAFs and three CMAFs we evaluated reduced room-average particle concentrations, typically by 30% to 90%, relative to a baseline scenario with two air-changes per hour of ventilation (outside air) only. Increasing the rate of air flow recirculating through the filter and/or air flow from the ventilation did not always increase effectiveness. Concentrations were generally higher near the emission source than elsewhere in the room. Both the air flow configuration of the filter and its placement within the room were important, influencing room air flow patterns and the spatial distribution of concentrations. Air filters containing efficient, but non-high efficiency particulate air (HEPA) filter media were as effective as air filters containing HEPA filter media.

  8. Improving the safety of room air pneumoperitoneum for diagnostic laparoscopy.

    PubMed

    Ikechebelu, J I; Okeke, C A F

    2008-06-01

    Laparoscopic examination is a useful investigation in the evaluation of infertile women. To perform this test, pneumoperitoneum is required to distend the abdomen, improve visibility and displace the intestines out of the pelvis. Several gases have been used to achieve this purpose including Nitrous Oxide (N2O), Carbondioxide (CO2), Helium, Xenon andAir. This was a prospective study in a private fertility centre in Nnewi, Nigeria aimed at reducing the morbidities inherent in the use Room Air pneumoperitoneum for diagnostic laparoscopy. This was sequel to an earlier study, which revealed that women who had Room Air pneumoperitoneum had a higher port wound infection rate, abdominal discomfort (feeling of retained gas in the abdomen) and shoulder pain with resultant delayed return to normal activity than women who had Co2 pneumoperitoneum. This study demonstrated that the use of soda lime to purify the Room Air and a low pressure suction pump to evacuate the air after the procedure significantly reduced the wound infection rate and virtually eliminated the abdominal discomfort and shoulder pain associated with Room Air pneumoperitoneum. This was followed by early return to normal activity. Therefore, use of Room Air for pneumoperitoneum is safe and affordable. It is recommended for low resource settings.

  9. A multidimensional framework for assessing patient room configurations.

    PubMed

    Pati, Debajyoti; Harvey, Thomas E; Reyers, Evelyn; Evans, Jennie; Waggener, Laurie; Serrano, Marjorie; Saucier, Rachel; Nagle, Tina

    2009-01-01

    A framework for multidimensional assessment of patient room configurations is presented. Twenty-three issues are considered and categorized under six domains of assessment: (1) patient safety, (2) staff efficiency, (3) circulation, (4) infection control, (5) patient considerations, and (6) family amenities. Use of the framework to rank issues by importance and assess six alternative patient room configurations by a diverse group of experts in a symposium is described. One of the key questions posed during inpatient room design is the location of the bathroom. What issues are affected by the variations in room configuration that arise from bathroom location? A complete articulation of the issues that potentially are affected by room configuration is not available in the literature. The list of issues was developed by the authors in preparation for a symposium. The symposium was organized in May 2007 and attended by 14 experts from four institutions. Six alternative room configurations were used. Variations in the configurations included: (1) three same-handed and three mirror-image rooms; (2) three outboard, two inboard, and one nested bathroom; and (3) three rooms with footwall bathrooms and three with headwall bathrooms. In a four-step process, the attendees ranked the issues, discussed them in detail, rated each room configuration against each issue on a seven-point suitability scale, and conducted an overall assessment of the six configurations. Based on the ratings and rankings provided by the symposium participants, outboard bathroom locations were found to be most suitable, followed by nested and inboard configurations. Furthermore, configurations with patient bathrooms located on the footwall were rated as more suitable than headwall locations. The authors recommend, however, that the framework be used to determine a suitable room configuration in a specific context, rather than to identify configurations that will perform well universally.

  10. A Business Case for Nuclear Plant Control Room Modernization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Ken; Lawrie, Sean; Niedermuller, Josef M.

    This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM). The analysis presented in two forms; 1) a standalone technology upgrade, and 2) a technology upgrade that is built upon and incremental to a prior business case created for Mobile Work Packages (MWP). The business case contends that advanced communication and networking and analytical technologies will allow NPP to conduct control room operations with improved focus by reducing human factors and redundant manpower, and therefore operate with fewer errors. While some labor savings can be harvested in terms of overtime, the majority ofmore » savings are demonstrated as reduced time to take the plant off line and bring back on line in support of outages. The benefits are quantified to a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. This business case focuses on modernization of the operator control room and does not consider a complete overhaul and modernization of a plants instrument and control systems. While operators may be considering such an investment at their plants, the sizable capital investment required is not likely supported by a cost/benefit analysis alone. More likely, it is driven by obsolescence and reliability issues, and requires consideration of mechanical condition of plant systems, capital depreciation, financing, relicensing and overall viability of the plant asset over a 20-year horizon in a competitive market. Prior studies [REF] have indicated that such a modernization of plant I&C systems, alone or as part of a larger modernization effort, can yield very significant reductions in O&M costs. However, the depth of research and analysis required to develop a meaningful business case for a plant modernization effort is well beyond the scope of this study. While CRM as considered in this study can be easily integrated as part of grander plant

  11. IET control building (TAN620). interior personnel service room. sign next ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET control building (TAN-620). interior personnel service room. sign next to shower stall says, "fight athlete's foot with sani-mist." INEEL negative no. HD-21-1-1 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  12. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacques Hugo; Ronald Boring; Lew Hanes

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operatormore » performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples

  13. Documentation of White Flight Control Room (WFCR), Building 30 during STS-109.

    NASA Image and Video Library

    2002-03-07

    JSC2002-E-08460 (7 March 2002) --- Flight directors Jeff Hanley (standing) and Bryan P. Austin watch the large screens from their consoles in the shuttle flight control room (WFCR) in Houston’;s Mission Control Center (MCC) during the STS-109 Hubble Space Telescope (HST) servicing mission.

  14. Motor Room, overall view to the west. The control cabinet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Motor Room, overall view to the west. The control cabinet and cement pipes along the south wall are being temporarily stored in the Pumping Plant and are not part of the original equipment - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  15. 18. NORTH SIDE OF CONTROL ROOM SHOWING MAIN ELECTRIC PANEL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. NORTH SIDE OF CONTROL ROOM SHOWING MAIN ELECTRIC PANEL ON LEFT, SIGNAL SWITCH BOX IN CENTER, AND SIGNAL RELAYS ON RIGHT. RESISTOR BANK BEHIND ON RIGHT. BRIDGE TENDER'S DESK BEHIND ON SOUTH SIDE. (Fred Small) - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR

  16. 12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. "TAPE ROOM" LOCATED AT SOUTHEAST CORNER OF MAIN ROOM. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Instrumentation & Control Building, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA

  17. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING NORTH - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  18. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  19. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 3, FACING EAST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  20. DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF OPERATIONS MANAGEMENT ROOM, FIRING ROOM NO. 4, FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Launch Control Center, LCC Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  1. 46 CFR 62.25-15 - Safety control systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... manual safety trip controls must be provided for all main boilers, turbines, and internal combustion... 46 Shipping 2 2012-10-01 2012-10-01 false Safety control systems. 62.25-15 Section 62.25-15... AUTOMATION General Requirements for All Automated Vital Systems § 62.25-15 Safety control systems. (a...

  2. 46 CFR 62.25-15 - Safety control systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... manual safety trip controls must be provided for all main boilers, turbines, and internal combustion... 46 Shipping 2 2013-10-01 2013-10-01 false Safety control systems. 62.25-15 Section 62.25-15... AUTOMATION General Requirements for All Automated Vital Systems § 62.25-15 Safety control systems. (a...

  3. 46 CFR 62.25-15 - Safety control systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... manual safety trip controls must be provided for all main boilers, turbines, and internal combustion... 46 Shipping 2 2014-10-01 2014-10-01 false Safety control systems. 62.25-15 Section 62.25-15... AUTOMATION General Requirements for All Automated Vital Systems § 62.25-15 Safety control systems. (a...

  4. Relationship Between Operating Room Teamwork, Contextual Factors, and Safety Checklist Performance.

    PubMed

    Singer, Sara J; Molina, George; Li, Zhonghe; Jiang, Wei; Nurudeen, Suliat; Kite, Julia G; Edmondson, Lizabeth; Foster, Richard; Haynes, Alex B; Berry, William R

    2016-10-01

    Studies show that using surgical safety checklists (SSCs) reduces complications. Many believe SSCs accomplish this by enhancing teamwork, but evidence is limited. Our study sought to relate teamwork to checklist performance, understand how they relate, and determine conditions that affect this relationship. Using 2 validated tools for observing and coaching operating room teams, we evaluated the association between checklist performance with surgeon buy-in and 4 domains of surgical teamwork: clinical leadership, communication, coordination, and respect. Hospital staff in 10 South Carolina hospitals observed 207 procedures between April 2011 and January 2013. We calculated levels of checklist performance, buy-in, and measures of teamwork, and evaluated their relationship, controlling for patient and case characteristics. Few teams completed most or all SSC items. Teams more often completed items considered procedural "checks" than conversation "prompts." Surgeon buy-in, clinical leadership, communication, a summary measure of teamwork overall, and observers' teamwork ratings positively related to overall checklist completion (multivariable model estimates from 0.04, p < 0.05 for communication to 0.17, p < 0.01 for surgeon buy-in). All measures of teamwork and surgeon buy-in related positively to completing more conversation prompts; none related significantly to procedural checks (estimates from 0.10, p < 0.01 for communication to 0.27, p < 0.001 for surgeon buy-in). Patient age was significantly associated with completing the checklist and prompts (p < 0.05); only case duration was positively associated with performing more checks (p < 0.10). Surgeon buy-in and surgical teamwork characterized by shared clinical leadership, open communication, active coordination, and mutual respect were critical in prompting case-related conversations, but not in completing procedural checks. Findings highlight the importance of surgeon engagement and high-quality, consistent

  5. PBF Control Building (PER619). Interior in data acquisition room showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619). Interior in data acquisition room showing data racks. The system recorded multiple channels of data during tests. INEEL negative no. HD-41-8-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  6. STS-118 Ascent/Entry Flight Control Team in White Flight Control Room (WFCR) with Flight Director Steve Stitch

    NASA Image and Video Library

    2007-07-20

    JSC2007-E-41011 (20 July 2007) --- STS-118 Ascent/Entry flight control team pose for a group portrait in the space shuttle flight control room of Houston's Mission Control Center (MCC). Flight director Steve Stich (center right) and astronaut Tony Antonelli, spacecraft communicator (CAPCOM), hold the STS-118 mission logo.

  7. 46 CFR 154.315 - Cargo pump and cargo compressor rooms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo pump and cargo compressor rooms. 154.315 Section... CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design, Construction and Equipment Ship Arrangements § 154.315 Cargo pump and cargo compressor rooms. (a) Cargo pump rooms and cargo...

  8. Prevention of 3 "never events" in the operating room: fires, gossypiboma, and wrong-site surgery.

    PubMed

    Zahiri, Hamid R; Stromberg, Jeffrey; Skupsky, Hadas; Knepp, Erin K; Folstein, Matthew; Silverman, Ronald; Singh, Devinder

    2011-03-01

    This study sought to identify and provide preventative recommendations for potentially devastating safety violations in the operating room. A Medline database search from 1950 to current using the terms patient safety and operating room was conducted. All topics identified were reviewed. Three patient safety violations with potential for immediate and devastating outcomes were selected for discussion using evidence-based literature. The search identified 2851 articles, 807 of which were directly related to patient safety in the operating room. Topics addressed by these 807 included infectious complications (26%), fires (11%), communication/teamwork (6%), retained foreign objects (3%), safety checklists (1%), and wrong-site surgery (1%). Fires, gossypiboma, and wrong-site surgery were selected for discussion. Although fire, gossypiboma, and wrong-site surgery should be "never events" in the operating room, they continue to persist as 3 common patient safety violations. This study provides the epidemiology, common etiologies, and evidence-based preventative recommendations for each.

  9. 11. Interior view of control room in Components Test Laboratory ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Interior view of control room in Components Test Laboratory (T-27), looking north. Photograph shows upgraded instrumentation, piping, and technological modifications installed in 1997-99 to accommodate component testing requirements for the Atlas V missile. - Air Force Plant PJKS, Systems Integration Laboratory, Components Test Laboratory, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO

  10. 16. NBS TOPSIDE CONTROL ROOM, THE NBS HYPERBARIC CHAMBER IS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. NBS TOPSIDE CONTROL ROOM, THE NBS HYPERBARIC CHAMBER IS VERY CLOSE TO THE WATER'S EDGE AND HERE FOR DIVER EMERGENCY SUPPORT. A MEDICAL STAFF IS LOCATED ON THE MARSHALL SPACE FLIGHT CENTER (MSFC) AND SUPPORTS THE NBS PERSONNEL WHEN HYPERBARIC CHAMBER OPERATION IS NECESSARY. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL

  11. 36. ENGINE ROOM FROM STARBOARD SIDE OF CONTROL CONSOLE, LOOKING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. ENGINE ROOM FROM STARBOARD SIDE OF CONTROL CONSOLE, LOOKING AT TWO DIESEL ENGINES, STAIRS LEAD UP TO CREW'S BERTHING. THIS IMAGE IS CLOSER TO THE STERN AND MORE ANGLED TOWARDS THE PORT THAN IMAGE 34. - U.S. Coast Guard Cutter WHITE LUPINE, U.S. Coast Guard Station Rockland, east end of Tillson Avenue, Rockland, Knox County, ME

  12. A Pilot Study Investigating the Effects of Advanced Nuclear Power Plant Control Room Technologies: Methods and Qualitative Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BLanc, Katya Le; Powers, David; Joe, Jeffrey

    2015-08-01

    Control room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. Nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Upgrades in the U.S. do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The goal of the control room upgrade benefits research is to identify previously overlooked benefits of modernization, identify candidate technologiesmore » that may facilitate such benefits, and demonstrate these technologies through human factors research. This report describes a pilot study to test upgrades to the Human Systems Simulation Laboratory at INL.« less

  13. Job Demands-Control-Support model and employee safety performance.

    PubMed

    Turner, Nick; Stride, Chris B; Carter, Angela J; McCaughey, Deirdre; Carroll, Anthony E

    2012-03-01

    The aim of this study was to explore whether work characteristics (job demands, job control, social support) comprising Karasek and Theorell's (1990) Job Demands-Control-Support framework predict employee safety performance (safety compliance and safety participation; Neal and Griffin, 2006). We used cross-sectional data of self-reported work characteristics and employee safety performance from 280 healthcare staff (doctors, nurses, and administrative staff) from Emergency Departments of seven hospitals in the United Kingdom. We analyzed these data using a structural equation model that simultaneously regressed safety compliance and safety participation on the main effects of each of the aforementioned work characteristics, their two-way interactions, and the three-way interaction among them, while controlling for demographic, occupational, and organizational characteristics. Social support was positively related to safety compliance, and both job control and the two-way interaction between job control and social support were positively related to safety participation. How work design is related to employee safety performance remains an important area for research and provides insight into how organizations can improve workplace safety. The current findings emphasize the importance of the co-worker in promoting both safety compliance and safety participation. Crown Copyright © 2011. Published by Elsevier Ltd. All rights reserved.

  14. 77 FR 74275 - Pipeline Safety: Information Collection Activities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No.... These regulations require operators of hazardous liquid pipelines and gas pipelines to develop and... control room. Affected Public: Operators of both natural gas and hazardous liquid pipeline systems. Annual...

  15. Control Technologies for Room Air-conditioner and Packaged Air-conditioner

    NASA Astrophysics Data System (ADS)

    Ito, Nobuhisa

    Trends of control technologies about air-conditioning machineries, especially room or packaged air conditioners, are presented in this paper. Multiple air conditioning systems for office buildings are mainly described as one application of the refrigeration cycle control technologies including sensors for thermal comfort and heating/ cooling loads are also described as one of the system control technologies. Inverter systems and related technologies for driving variable speed compressors are described in both case of including induction motors and brushless DC motors. Technologies for more accurate control to meet various kind of regulations such as ozone layer destruction, energy saving and global warming, and for eliminating harmonic distortion of power source current, as a typical EMC problem, will be urgently desired.

  16. 14. NBS REMOTE MANIPULATOR SIMULATOR (RMS) CONTROL ROOM. THE RMS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. NBS REMOTE MANIPULATOR SIMULATOR (RMS) CONTROL ROOM. THE RMS CONTROL PANEL IS IDENTICAL TO THE SHUTTLE ORBITER AFT FLIGHT DECK WITH ALL RMS SWITCHES AND CONTROL KNOBS FOR INVOKING ANY POSSIBLE FLIGHT OPERATIONAL MODE. THIS INCLUDES ALL COMPUTER AIDED OPERATIONAL MODES, AS WELL AS FULL MANUAL MODE. THE MONITORS IN THE AFT FLIGHT DECK WINDOWS AND THE GLASSES THE OPERATOR WEARS PROVIDE A 3-D VIDEO PICTURE TO AID THE OPERATOR WITH DEPTH PERCEPTION WHILE OPERATING THE ARM. THIS IS REQUIRED BECAUSE THE RMS OPERATOR CANNOT VIEW RMS MOVEMENTS IN THE WATER WHILE AT THE CONTROL PANEL. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL

  17. Occupant UV Exposure Measurements for Upper-Room Ultraviolet Germicidal Irradiation

    PubMed Central

    Milonova, Sonya; Rudnick, Stephen; McDevitt, James; Nardell, Edward

    2016-01-01

    The threshold limit value (TLV) guideline for ultraviolet (UV) radiation specifies that irradiance measurements to ensure occupant safety be taken over an angle of 80° at the sensor. The purpose of this study was to evaluate the effect of an 80° field of view (FOV) tube on lower room UV-C irradiation measurements. Measurements were made in an experimental chamber at a height of 1.73 m with and without an FOV tube. The FOV tube reduced the lower room irradiance readings by 18-34%, a statistically significant reduction compared to the bare sensor. An 80° FOV tube should be used for lower room irradiance measurements to comply with the TLV guideline. The resulting lower readings would allow more UV-C radiation in the upper room without compromising occupant safety. More UV-C radiation in the upper room could increase efficacy of UVGI systems for reducing transmission of airborne infectious diseases. In addition, recommendations are made to standardize lower room irradiance measurement techniques. PMID:27038734

  18. Governing time in operating rooms.

    PubMed

    Riley, Robin; Manias, Elizabeth

    2006-05-01

    This paper examines how time is controlled and governed in operating rooms through interpersonal communication between nurses and doctors. Time is a valuable commodity in organizations with improvements often directed towards maximizing efficiencies. As a consequence, time can be a source of tension and interpersonal conflict as individuals compete for control of its use. The data in this paper emanate from an ethnographic study that explored a range of communication practices in operating room nursing. Participants comprised 11 operating room nurses. Data were collected over two years in three different institutional settings and involved participant observation, interviews and the keeping of a personal diary. A deconstructive analysis of the data was undertaken. Results are discussed in terms of the practices, in which clinicians are engaged in, to govern and control their use of time. The four practices presented in this paper include; questioning judgment and timing, controlling speed, estimating surgeons' use of time and coping with different perceptions of time. Time and speed were hotly contested by nurses. They used their personal knowledge of individual surgeon's habits of time to govern and control practice. Nurses thought about surgeons in terms of time and developed commonly accepted understandings about the length of surgical procedures. They used this knowledge to manage the scheduling of operations in the departments and to control the workflow in individual operating rooms. Knowledge of individual surgeons was a source of power for operating room nurses. Nurses have more power in the operating room than might be imagined but they exercise this power in subtle ways. If operating rooms are to work effectively, the operating room team must understand each others' work better.

  19. 130. VIEW OF CONTROL ROOM (114), LSB (BLDG. 770), FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    130. VIEW OF CONTROL ROOM (114), LSB (BLDG. 770), FROM WEST. HYDRAULIC PUMPING UNIT (HPU) IN CENTER OF PHOTO, FACING NORTH. NITROGEN SUPPLY PANEL ON SOUTH WALL (LEFT EDGE OF PHOTO); RELAY BOX FOR HPU ON SOUTH WALL BEHIND HPU. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 West, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  20. IET. Control and equipment building (TAN620). Details and room finish ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET. Control and equipment building (TAN-620). Details and room finish schedule. Ralph M. Parsons 902-4-ANP-620-A 322. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0629-00-693-106907 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  1. Do safety checklists improve teamwork and communication in the operating room? A systematic review.

    PubMed

    Russ, Stephanie; Rout, Shantanu; Sevdalis, Nick; Moorthy, Krishna; Darzi, Ara; Vincent, Charles

    2013-12-01

    The aim of this systematic review was to assess the impact of surgical safety checklists on the quality of teamwork and communication in the operating room (OR). Safety checklists have been shown to impact positively on patient morbidity and mortality following surgery, but it is unclear whether this clinical improvement is related to an improvement in OR teamwork and communication. A systematic search strategy of MEDLINE, EMBASE, PsycINFO, Google Scholar, and the Cochrane Database for Systematic Reviews was undertaken to obtain relevant articles. After de-duplication and the addition of limits, 315 articles were screened for inclusion by 2 researchers and all articles meeting a set of prespecified inclusion criteria were retained. Information regarding the type of checklist, study design, assessment tools used, outcomes, and study limitations was extracted. Twenty articles formed the basis of this systematic review. All articles described an empirical study relating to a case-specific safety checklist for surgery as the primary intervention, with some measure of change/improvement in teamwork and/or communication relating to its use. The methods for assessing teamwork and communication varied greatly, including surveys, observations, interviews, and 360° assessments. The evidence suggests that safety checklists improve the perceived quality of OR teamwork and communication and reduce observable errors relating to poor team skills. This is likely to function through establishing an open platform for communication at the start of a procedure: encouraging the sharing of critical case-related information, promoting team coordination and decision making, flagging knowledge gaps, and enhancing team cohesion. However, the evidence would also suggest that when used suboptimally or when individuals have not bought in to the process, checklists may conversely have a negative impact on the function of the team. Safety checklists are beneficial for OR teamwork and

  2. Medication room madness: calming the chaos.

    PubMed

    Conrad, Carole; Fields, Willa; McNamara, Tracey; Cone, Maryann; Atkins, Patricia

    2010-01-01

    Nurses work in stressful environments, encountering interruptions and distractions at almost every turn. The aim of this medication safety project was to improve the physical design and organizational layout of the medication room, reduce nurse interruptions and distractions, and create a standard medication process for enhanced patient safety and efficiency. This successful change improved the medication administration process, decreased medication errors, and enhanced nursing satisfaction.

  3. Safety culture in the operating room of a public hospital in the perception of healthcare professionals1

    PubMed Central

    Carvalho, Paloma Aparecida; Göttems, Leila Bernarda Donato; Pires, Maria Raquel Gomes Maia; de Oliveira, Maria Liz Cunha

    2015-01-01

    Objective: to evaluate the perception of healthcare professionals about the safety culture in the operating room of a public hospital, large-sized, according to the domains of the Safety Attitudes Questionnaire (SAQ). Method: descriptive, cross-sectional and quantitative research, with the application of the SAQ to 226 professionals. Descriptive data analysis, instrument consistency and exploratory factor analysis. Results: participants were distributed homogeneously between females (49.6%) and males (50.4%); mean age of 39.6 (SD±9.9) years and length of professional experience of 9.9 (SD±9.2) years. And Cronbach's ( of 0.84. It was identified six domains proposed in the questionnaire: stress perception (74.5) and job satisfaction (70.7) showed satisfactory results; teamwork environment (59.1) and climate of security (48.9) presented scores below the minimum recommended (75); unit's management perceptions (44.5), hospital management perceptions (34.9) and working conditions (41.9) presented the lowest averages. Conclusions: the results showed that, from the perspective of the professionals, there is weakness in the values, attitudes, skills and behaviors that determine the safety culture in a healthcare organization. PMID:26625994

  4. Workflows and individual differences during visually guided routine tasks in a road traffic management control room.

    PubMed

    Starke, Sandra D; Baber, Chris; Cooke, Neil J; Howes, Andrew

    2017-05-01

    Road traffic control rooms rely on human operators to monitor and interact with information presented on multiple displays. Past studies have found inconsistent use of available visual information sources in such settings across different domains. In this study, we aimed to broaden the understanding of observer behaviour in control rooms by analysing a case study in road traffic control. We conducted a field study in a live road traffic control room where five operators responded to incidents while wearing a mobile eye tracker. Using qualitative and quantitative approaches, we investigated the operators' workflow using ergonomics methods and quantified visual information sampling. We found that individuals showed differing preferences for viewing modalities and weighting of task components, with a strong coupling between eye and head movement. For the quantitative analysis of the eye tracking data, we propose a number of metrics which may prove useful to compare visual sampling behaviour across domains in future. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  5. American ASTP crewmen briefed on operation of consoles in main control room

    NASA Image and Video Library

    1975-04-25

    S75-25619 (25 April 1975) --- A group of American ASTP crewmen is briefed on the operation of the consoles in the main control room at the ASTP flight control center at the Cosmonaut Training Center (Star City) near Moscow. The astronauts were in the Soviet Union for ASTP joint crew training with the Soviet ASTP crewmen. PHOTO COURTESY: USSR ACADEMY OF SCIENCES

  6. PBF Reactor Building (PER620) as seen from control room window ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Reactor Building (PER-620) as seen from control room window in PER-619. Photographer stood just outside window. Note exposed communication cables on desert surface. Date: July 2004. INEEL negative no. HD-41-9-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  7. Controlled versus automatic processes: which is dominant to safety? The moderating effect of inhibitory control.

    PubMed

    Xu, Yaoshan; Li, Yongjuan; Ding, Weidong; Lu, Fan

    2014-01-01

    This study explores the precursors of employees' safety behaviors based on a dual-process model, which suggests that human behaviors are determined by both controlled and automatic cognitive processes. Employees' responses to a self-reported survey on safety attitudes capture their controlled cognitive process, while the automatic association concerning safety measured by an Implicit Association Test (IAT) reflects employees' automatic cognitive processes about safety. In addition, this study investigates the moderating effects of inhibition on the relationship between self-reported safety attitude and safety behavior, and that between automatic associations towards safety and safety behavior. The results suggest significant main effects of self-reported safety attitude and automatic association on safety behaviors. Further, the interaction between self-reported safety attitude and inhibition and that between automatic association and inhibition each predict unique variances in safety behavior. Specifically, the safety behaviors of employees with lower level of inhibitory control are influenced more by automatic association, whereas those of employees with higher level of inhibitory control are guided more by self-reported safety attitudes. These results suggest that safety behavior is the joint outcome of both controlled and automatic cognitive processes, and the relative importance of these cognitive processes depends on employees' individual differences in inhibitory control. The implications of these findings for theoretical and practical issues are discussed at the end.

  8. Controlled versus Automatic Processes: Which Is Dominant to Safety? The Moderating Effect of Inhibitory Control

    PubMed Central

    Xu, Yaoshan; Li, Yongjuan; Ding, Weidong; Lu, Fan

    2014-01-01

    This study explores the precursors of employees' safety behaviors based on a dual-process model, which suggests that human behaviors are determined by both controlled and automatic cognitive processes. Employees' responses to a self-reported survey on safety attitudes capture their controlled cognitive process, while the automatic association concerning safety measured by an Implicit Association Test (IAT) reflects employees' automatic cognitive processes about safety. In addition, this study investigates the moderating effects of inhibition on the relationship between self-reported safety attitude and safety behavior, and that between automatic associations towards safety and safety behavior. The results suggest significant main effects of self-reported safety attitude and automatic association on safety behaviors. Further, the interaction between self-reported safety attitude and inhibition and that between automatic association and inhibition each predict unique variances in safety behavior. Specifically, the safety behaviors of employees with lower level of inhibitory control are influenced more by automatic association, whereas those of employees with higher level of inhibitory control are guided more by self-reported safety attitudes. These results suggest that safety behavior is the joint outcome of both controlled and automatic cognitive processes, and the relative importance of these cognitive processes depends on employees' individual differences in inhibitory control. The implications of these findings for theoretical and practical issues are discussed at the end. PMID:24520338

  9. Direct surgeon control of the computer in the operating room.

    PubMed

    Onceanu, Dumitru; Stewart, A James

    2011-01-01

    This paper describes the design and evaluation of a joystick-like device that allows direct surgeon control of the computer in the operating room. The device contains no electronic parts, is easy to use, is unobtrusive, has no physical connection to the computer, and makes use of an existing surgical tool. The device was tested in comparison to a mouse and to verbal dictation.

  10. 9 CFR 354.241 - Cleaning of rooms and compartments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Cleaning of rooms and compartments. 354.241 Section 354.241 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... Sanitary Conditions and Precautions Against Contamination of Products § 354.241 Cleaning of rooms and...

  11. MTR, TRA603. CONTROL ROOM DETAILS. ACOUSTIC PLASTER CEILING, USHAPED CONSOLE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    MTR, TRA-603. CONTROL ROOM DETAILS. ACOUSTIC PLASTER CEILING, U-SHAPED CONSOLE, INSTRUMENT PANELS, GLASS DOOR, ASPHALT TILE FLOOR AND COLORS. BLAW-KNOX 3150-803-11, 10/1950. INL INDEX NO. 531-0603-00-098-100570, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  12. System for controlling child safety seat environment

    NASA Technical Reports Server (NTRS)

    Elrod, Susan V. (Inventor); Dabney, Richard W. (Inventor)

    2008-01-01

    A system is provided to control the environment experienced by a child in a child safety seat. Each of a plurality of thermoelectric elements is individually controllable to be one of heated and cooled relative to an ambient temperature. A first portion of the thermoelectric elements are positioned on the child safety seat such that a child sitting therein is positioned thereover. A ventilator coupled to the child safety seat moves air past a second portion of the thermoelectric elements and filters the air moved therepast. One or more jets coupled to the ventilator receive the filtered air. Each jet is coupled to the child safety seat and can be positioned to direct the heated/cooled filtered air to the vicinity of the head of the child sitting in the child safety seat.

  13. PBF Control Building (PER619) floor plan and elevations. Room numbers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building (PER-619) floor plan and elevations. Room numbers and functions. Roof plans for "high" roof and rest of roof. Ebasco Services 1205-PER/PER 619-A-1. Date: July 1965. INEEL index no. 760-0619-00-205-123022 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  14. Verification and Implementation of Operations Safety Controls for Flight Missions

    NASA Technical Reports Server (NTRS)

    Jones, Cheryl L.; Smalls, James R.; Carrier, Alicia S.

    2010-01-01

    Approximately eleven years ago, the International Space Station launched the first module from Russia, the Functional Cargo Block (FGB). Safety and Mission Assurance (S&MA) Operations (Ops) Engineers played an integral part in that endeavor by executing strict flight product verification as well as continued staffing of S&MA's console in the Mission Evaluation Room (MER) for that flight mission. How were these engineers able to conduct such a complicated task? They conducted it based on product verification that consisted of ensuring that safety requirements were adequately contained in all flight products that affected crew safety. S&MA Ops engineers apply both systems engineering and project management principles in order to gain a appropriate level of technical knowledge necessary to perform thorough reviews which cover the subsystem(s) affected. They also ensured that mission priorities were carried out with a great detail and success.

  15. Evaluation of optimum room entry times for radiation therapists after high energy whole pelvic photon treatments.

    PubMed

    Ho, Lavine; White, Peter; Chan, Edward; Chan, Kim; Ng, Janet; Tam, Timothy

    2012-01-01

    Linear accelerators operating at or above 10 MV produce neutrons by photonuclear reactions and induce activation in machine components, which are a source of potential exposure for radiation therapists. This study estimated gamma dose contributions to radiation therapists during high energy, whole pelvic, photon beam treatments and determined the optimum room entry times, in terms of safety of radiation therapists. Two types of technique (anterior-posterior opposing and 3-field technique) were studied. An Elekta Precise treatment system, operating up to 18 MV, was investigated. Measurements with an area monitoring device (a Mini 900R radiation monitor) were performed, to calculate gamma dose rates around the radiotherapy facility. Measurements inside the treatment room were performed when the linear accelerator was in use. The doses received by radiation therapists were estimated, and optimum room entry times were determined. The highest gamma dose rates were approximately 7 μSv/h inside the treatment room, while the doses in the control room were close to background (~0 μSv/h) for all techniques. The highest personal dose received by radiation therapists was estimated at 5 mSv/yr. To optimize protection, radiation therapists should wait for up to11 min after beam-off prior to room entry. The potential risks to radiation therapists with standard safety procedures were well below internationally recommended values, but risks could be further decreased by delaying room entry times. Dependent on the technique used, optimum entry times ranged between 7 to 11 min. A balance between moderate treatment times versus reduction in measured equivalent doses should be considered.

  16. "Defense-in-Depth" Laser Safety and the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, J J

    The National Ignition Facility (NIF) is the largest and most energetic laser in the world contained in a complex the size of a football stadium. From the initial laser pulse, provided by telecommunication style infrared nanoJoule pulsed lasers, to the final 192 laser beams (1.8 Mega Joules total energy in the ultraviolet) converging on a target the size of a pencil eraser, laser safety is of paramount concern. In addition to this, there are numerous high-powered (Class 3B and 4) diagnostic lasers in use that can potentially send their laser radiation travelling throughout the facility. With individual beam paths ofmore » up to 1500 meters and a workforce of more than one thousand, the potential for exposure is significant. Simple laser safety practices utilized in typical laser labs just don't apply. To mitigate these hazards, NIF incorporates a multi layered approach to laser safety or 'Defense in Depth.' Most typical high-powered laser operations are contained and controlled within a single room using relatively simplistic controls to protect both the worker and the public. Laser workers are trained, use a standard operating procedure, and are required to wear Personal Protective Equipment (PPE) such as Laser Protective Eyewear (LPE) if the system is not fully enclosed. Non-workers are protected by means of posting the room with a warning sign and a flashing light. In the best of cases, a Safety Interlock System (SIS) will be employed which will 'safe' the laser in the case of unauthorized access. This type of laser operation is relatively easy to employ and manage. As the operation becomes more complex, higher levels of control are required to ensure personnel safety. Examples requiring enhanced controls are outdoor and multi-room laser operations. At the NIF there are 192 beam lines and numerous other Class 4 diagnostic lasers that can potentially deliver their hazardous energy to locations far from the laser source. This presents a serious and complex

  17. [Plug-in Based Centralized Control System in Operating Rooms].

    PubMed

    Wang, Yunlong

    2017-05-30

    Centralized equipment controls in an operating room (OR) is crucial to an efficient workflow in the OR. To achieve centralized control, an integrative OR needs to focus on designing a control panel that can appropriately incorporate equipment from different manufactures with various connecting ports and controls. Here we propose to achieve equipment integration using plug-in modules. Each OR will be equipped with a dynamic plug-in control panel containing physically removable connecting ports. Matching outlets will be installed onto the control panels of each equipment used at any given time. This dynamic control panel will be backed with a database containing plug-in modules that can connect any two types of connecting ports common among medical equipment manufacturers. The correct connecting ports will be called using reflection dynamics. This database will be updated regularly to include new connecting ports on the market, making it easy to maintain, update, expand and remain relevant as new equipment are developed. Together, the physical panel and the database will achieve centralized equipment controls in the OR that can be easily adapted to any equipment in the OR.

  18. 17. Perimeter acquisition radar building room #105, mechanical equipment room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Perimeter acquisition radar building room #105, mechanical equipment room no. 1; sign reads: Heat exchangers (shell and tube type). Provide precise temperature control of water for cooling critical electronic equipment - Stanley R. Mickelsen Safeguard Complex, Perimeter Acquisition Radar Building, Limited Access Area, between Limited Access Patrol Road & Service Road A, Nekoma, Cavalier County, ND

  19. Plum Brook Reactor Facility Control Room during Facility Startup

    NASA Image and Video Library

    1961-02-21

    Operators test the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility systems in the months leading up to its actual operation. The “Reactor On” signs are illuminated but the reactor core was not yet ready for chain reactions. Just a couple weeks after this photograph, Plum Brook Station held a media open house to unveil the 60-megawatt test reactor near Sandusky, Ohio. More than 60 members of the print media and radio and television news services met at the site to talk with community leaders and representatives from NASA and Atomic Energy Commission. The Plum Brook reactor went critical for the first time on the evening of June 14, 1961. It was not until April 1963 that the reactor reached its full potential of 60 megawatts. The reactor control room, located on the second floor of the facility, was run by licensed operators. The operators manually operated the shim rods which adjusted the chain reaction in the reactor core. The regulating rods could partially or completely shut down the reactor. The control room also housed remote area monitoring panels and other monitoring equipment that allowed operators to monitor radiation sensors located throughout the facility and to scram the reactor instantly if necessary. The color of the indicator lights corresponded with the elevation of the detectors in the various buildings. The reactor could also shut itself down automatically if the monitors detected any sudden irregularities.

  20. 26. A typical outer rod room, or rack room, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. A typical outer rod room, or rack room, showing the racks for the nine horizontal control rods (HCRs) that would be inserted or withdrawn from the pile to control the rate of reaction. In this case, it is the 105-F Reactor in February 1945. The view is looking away from the pile, which is out of the picture on the left. Several of the cooling water hose reels for the rods can be seen at the end of the racks near the wall. D-8323 - B Reactor, Richland, Benton County, WA

  1. Thinking in three's: changing surgical patient safety practices in the complex modern operating room.

    PubMed

    Gibbs, Verna C

    2012-12-14

    The three surgical patient safety events, wrong site surgery, retained surgical items (RSI) and surgical fires are rare occurrences and thus their effects on the complex modern operating room (OR) are difficult to study. The likelihood of occurrence and the magnitude of risk for each of these surgical safety events are undefined. Many providers may never have a personal experience with one of these events and training and education on these topics are sparse. These circumstances lead to faulty thinking that a provider won't ever have an event or if one does occur the provider will intuitively know what to do. Surgeons are not preoccupied with failure and tend to usually consider good outcomes, which leads them to ignore or diminish the importance of implementing and following simple safety practices. These circumstances contribute to the persistent low level occurrence of these three events and to the difficulty in generating sufficient interest to resource solutions. Individual facilities rarely have the time or talent to understand these events and develop lasting solutions. More often than not, even the most well meaning internal review results in a new line to a policy and some rigorous enforcement mandate. This approach routinely fails and is another reason why these problems are so persistent. Vigilance actions alone have been unsuccessful so hospitals now have to take a systematic approach to implementing safer processes and providing the resources for surgeons and other stakeholders to optimize the OR environment. This article discusses standardized processes of care for mitigation of injury or outright prevention of wrong site surgery, RSI and surgical fires in an action-oriented framework illustrating the strategic elements important in each event and focusing on the responsibilities for each of the three major OR agents-anesthesiologists, surgeons and nurses. A Surgical Patient Safety Checklist is discussed that incorporates the necessary elements to

  2. Evolving safety practices in the setting of modern complex operating room: role of nurses.

    PubMed

    Niu, L; Li, H Y; Tang, W; Gong, S; Zhang, L J

    2017-01-01

    Operating room (OR) nursing previously referred to patient care provided during the intra-operative phase and the service provided within the OR itself. With the expansion of responsibilities of nurses, OR nursing now includes pre-operative and post-operative periods, therefore peri-operative nursing is accepted as a nursing process in OR in the contemporary medical literature. Peri-operative nurses provide care to the surgical patients during the entire process of surgery. They have several roles including those of manager or a director, clinical practitioner (scrub nurse, circulating nurse and nurse anesthetist), educator as well as researcher. Although, utmost priority is placed on insuring patient safety and well-being, they are also expected to participate in professional organization, continuing medical education programs and participating in research activities. A Surgical Patient Safety Checklist formulated by the World Health Organization serves as a major guideline to all activities in OR, and peri-operative nurses are key personnel in its implementation. Communication among the various players of a procedure in OR is key to successful patient outcome, and peri-operative nurses have a central role in making it happen. Setting up of OR in military conflict zones or places that suffering a widespread natural disaster poses a unique challenge to nursing. This review discusses all aspects of peri-operative nursing and suggests points of improvement in patient care.

  3. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Automatic control and safety tests. 61.30-20 Section 61... TESTS AND INSPECTIONS Tests and Inspections of Fired Thermal Fluid Heaters § 61.30-20 Automatic control and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  4. How does patient safety culture in the operating room and post-anesthesia care unit compare to the rest of the hospital?

    PubMed

    Kaafarani, Haytham M A; Itani, Kamal M F; Rosen, Amy K; Zhao, Shibei; Hartmann, Christine W; Gaba, David M

    2009-07-01

    A strong patient safety culture in the operating room (OR) and post-anesthesia care unit (PACU) is essential to promote safe care. The Patient Safety Climate in Healthcare Organizations (PSCHO) survey was administered to employees at 30 Veterans Affairs (VA) hospitals. The survey consisted of 42 close-ended items representing 12 different dimensions of safety. We measured percent problematic response (PPR); higher PPR values reflect weaker safety culture. The "OR/PACU" and the "Other Work Areas" groups' item-specific, dimension-specific, and overall problematic responses were compared. The overall and dimension-specific PPRs were similar between the OR/PACU and the Other Work Areas group (overall: 20.2% and 18.1%, respectively; P = .41). When the 2 groups were compared on an item-by-item level, the OR/PACU staff reported more frequent witnessing of unsafe patient care (PPR 55.1% vs 43.2%; P = .01), and perceived less understanding by senior leadership of clinical care (PPR 28.3% vs 17.1%; P = .01) and less hospital interest in quality of care (PPR 20.4% vs 12.5%; P = .03). Specific areas of safety culture in the OR/PACU were found that should be targeted for improvement.

  5. [Working conditions in operating rooms].

    PubMed

    Kułagowska, Ewa

    2007-01-01

    The aim of this study was to get acquainted with the opinions of the nursing staff on working conditions at their workplace. The study was carried out in a group of 398 nurses working in various kinds of operating rooms at 11 public hospitals. A questionnaire was used as a major tool of this study. The questionnaires were filled in by 259 operating room nurses (circulating nurses) and 139 nurse-anesthetists. The collected data show that working conditions in operating rooms do not ensure safety of the nursing staff at work. The main sources of problems are: work organization, technical factors, work equipment, work space, knowledge of hazards and strenuous factors among nurses, ways of preventing and/or limiting them. These elements are serious occupational risk factors influencing the work process and health status of nurses.

  6. Intelligent vehicle safety control strategy in various driving situations

    NASA Astrophysics Data System (ADS)

    Moon, Seungwuk; Cho, Wanki; Yi, Kyongsu

    2010-12-01

    This paper describes a safety control strategy for intelligent vehicles with the objective of optimally coordinating the throttle, brake, and active front steering actuator inputs to obtain both lateral stability and longitudinal safety. The control system consists of a supervisor, control algorithms, and a coordinator. From the measurement and estimation signals, the supervisor determines the active control modes among normal driving, longitudinal safety, lateral stability, and integrated safety control mode. The control algorithms consist of longitudinal and lateral stability controllers. The longitudinal controller is designed to improve the driver's comfort during normal, safe-driving situations, and to avoid rear-end collision in vehicle-following situations. The lateral stability controller is designed to obtain the required manoeuvrability and to limit the vehicle body's side-slip angle. To obtain both longitudinal safety and lateral stability control in various driving situations, the coordinator optimally determines the throttle, brake, and active front steering inputs based on the current status of the subject vehicle. Closed-loop simulations with the driver-vehicle-controller system are conducted to investigate the performance of the proposed control strategy. From these simulation results, it is shown that the proposed control algorithm assists the driver in combined severe braking/large steering manoeuvring so that the driver can maintain good manoeuvrability and prevent the vehicle from crashing in vehicle-following situations.

  7. Giant room temperature magnetoelectric response in strain controlled nanocomposites

    NASA Astrophysics Data System (ADS)

    Rafique, Mohsin; Herklotz, Andreas; Dörr, Kathrin; Manzoor, Sadia

    2017-05-01

    We report giant magnetoelectric coupling at room temperature in a self-assembled nanocomposite of BiFeO3-CoFe2O4 (BFO-CFO) grown on a BaTiO3 (BTO) crystal. The nanocomposite consisting of CFO nanopillars embedded in a BFO matrix exhibits weak perpendicular magnetic anisotropy due to a small out-of-plane compression (˜0.3%) of the magnetostrictive (CFO) phase, enabling magnetization rotation under moderate in-plane compression. Temperature dependent magnetization measurements demonstrate strong magnetoelastic coupling between the BaTiO3 substrate and the nanocomposite film, which has been exploited to produce a large magnetoelectric response in the sample. The reorientation of ferroelectric domains in the BTO crystal upon the application of an electric field (E) alters the strain state of the nanocomposite film, thus enabling control of its magnetic anisotropy. The strain mediated magnetoelectric coupling coefficient α = μ o d M / d E calculated from remnant magnetization at room temperature is 2.6 × 10-7 s m-1 and 1.5 × 10-7 s m-1 for the out-of-plane and in-plane orientations, respectively.

  8. Comparison of efficacy, safety, and cost-effectiveness of in-office cup forcep biopsies versus operating room biopsies for laryngopharyngeal tumors.

    PubMed

    Naidu, Harini; Noordzij, J Pieter; Samim, Arang; Jalisi, Scharukh; Grillone, Gregory A

    2012-09-01

    To compare the diagnostic yield, safety, and cost of biopsies of laryngopharyngeal tumor performed in an office setting with those performed in the operating room (OR) under general anesthesia. This was a retrospective review of patients' records at Boston Medical Center from 2006 to 2008. In-office biopsies were performed using flexible digital videolaryngoscopy with cup forcep biopsies taken via the working channel in patients in whom cancer was strongly suspected. Patients whose in-office biopsies were nondiagnostic or suspected to be falsely negative were taken to the OR for biopsy under general anesthesia and served as the control group. Twelve patients fit the selection criteria and had in-office biopsies attempted. One patient could not tolerate the in-office biopsy. Seven of the 11 in-office biopsies performed were diagnostic for squamous cell carcinoma. The average cost (facility and professional otolaryngology charges) for an in-office biopsy was $2053.91. Five of these patients required further biopsy in the OR at an average cost (charges for surgeon, OR, anesthesia, and recovery room) of $9024.47. There were no significant complications reported for any of the procedures. In patients with strongly suspected laryngopharyngeal cancer, in-office cup forcep biopsies were 64% diagnostic. When compared with the OR, in-office cup biopsies of laryngopharyngeal tumor are safe and considerably more cost-effective. Although 36% of patients required operative biopsies, the cost would have been considerably higher in this cohort if all patients had gone to the OR for biopsies. Copyright © 2012 The Voice Foundation. Published by Mosby, Inc. All rights reserved.

  9. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  10. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  11. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  12. Management of a fire in the operating room.

    PubMed

    Kaye, Alan David; Kolinsky, Daniel; Urman, Richard D

    2014-04-01

    Operating room (OR) fires remain a significant source of liability for anesthesia providers and injury for patients, despite existing practice guidelines and other improvements in operating room safety. Factors contributing to OR fires are well understood and these occurrences are generally preventable. OR personnel must be familiar with the fire triad which consists of a fuel supply, an oxidizing agent, and an ignition source. Existing evidence shows that OR-related fires can result in significant patient complications and malpractice claims. Steps to reduce fires include taking appropriate safety measures before a patient is brought to the OR, taking proper preventive measures during surgery, and effectively managing fire and patient complications when they occur. Decreasing the incidence of fires should be a team effort involving the entire OR personnel, including surgeons, anesthesia providers, nurses, scrub technologists, and administrators. Communication and coordination among members of the OR team is essential to creating a culture of safety.

  13. Fisheye view from the back of the Flight control room of the MCC

    NASA Image and Video Library

    1984-10-06

    Fisheye view from the back of the Flight Control Room (FCR) of the Mission Control Center (MCC). Visible are the Flight Directors console (left front), the CAPCOM console (right front) and the Payloads console. Some of the STS 41-G crew can be seen on a large screen at the front of the MCC along with a map tracking the progress of the orbiter.

  14. 46 CFR 62.25-15 - Safety control systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Safety control systems. 62.25-15 Section 62.25-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION General Requirements for All Automated Vital Systems § 62.25-15 Safety control systems. (a...

  15. Use of computer-assisted drug therapy outside the operating room.

    PubMed

    Singh, Preet Mohinder; Borle, Anuradha; Goudra, Basavana G

    2016-08-01

    The number of procedures performed in the out-of-operating room setting under sedation has increased many fold in recent years. Sedation techniques aim to achieve rapid patient turnover through the use of short-acting drugs with minimal residual side-effects (mainly propofol and opioids). Even for common procedures, the practice of sedation delivery varies widely among providers. Computer-based sedation models have the potential to assist sedation providers and offer a more consistent and safer sedation experience for patients. Target-controlled infusions using propofol and other short-acting opioids for sedation have shown promising results in terms of increasing patient safety and allowing for more rapid wake-up times. Target-controlled infusion systems with real-time patient monitoring can titrate drug doses automatically to maintain optimal depth of sedation. The best recent example of this is the propofol-based Sedasys sedation system. Sedasys redefined individualized sedation by the addition of an automated clinical parameter that monitors depth of sedation. However, because of poor adoption and cost issues, it has been recently withdrawn by the manufacturer. Present automated drug delivery systems can assist in the provision of sedation for out-of-operating room procedures but cannot substitute for anesthesia providers. Use of the available technology has the potential to improve patient outcomes, decrease provider workload, and have a long-term economic impact on anesthesia care delivery outside of the operating room.

  16. 75 FR 9196 - Letter From Secretary of Energy Accepting Defense Nuclear Facilities Safety Board (Board...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... capability for non- vital laboratory room electrical loads that provides an engineered control to reduce..., approximately two orders of magnitude higher than our evaluation guideline for selecting safety class controls. Approval of the DSA included recognition of weaknesses in the facility's control set and the need to...

  17. An integrated set of UNIX based system tools at control room level

    NASA Astrophysics Data System (ADS)

    Potepan, F.; Scafuri, C.; Bortolotto, C.; Surace, G.

    1994-12-01

    The design effort of providing a simple point-and-click approach to the equipment access has led to the definition and realization of a modular set of software tools to be used at the ELETTRA control room level. Point-to-point equipment access requires neither programming nor specific knowledge of the control system architecture. The development and integration of communication, graphic, editing and global database modules are described in depth, followed by a report of their use in the first commissioning period.

  18. Migration of Older to New Digital Control Systems in Nuclear Power Plant Main Control Rooms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, Casey Robert; Joe, Jeffrey Clark

    The United States (U.S.) Department of Energy (DOE) Office of Nuclear Energy (NE) has the primary mission to advance nuclear power by resolving socio-technical issues through research and development (R&D). One DOE-NE activity supporting this mission is the Light Water Reactor Sustainability (LWRS) program. LWRS has the overall objective to sustain the operation of existing commercial nuclear power plants (NPPs) through conducting R&D across multiple “pathways,” or R&D focus areas. The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systemsmore » in operating U.S. NPPs. This work involves (1) ensuring that legacy analog II&C systems are not life-limiting issues for the LWR fleet, and (2) implementing digital II&C technology in a manner that enables broad innovation and business improvement in the NPP operating model. Under the LWRS Advanced II&C pathway, Human Factors experts at Idaho National Laboratory (INL) have been conducting R&D in support of NPP main control room (MCR) modernization activities. Work in prior years has focused on migrating analog I&C systems to new digital I&C systems (). In fiscal year 2016 (FY16), one new focus area for this research is migrating older digital I&C systems to new and advanced digital I&C systems. This report summarizes a plan for conducting a digital-to-digital migration of a legacy digital I&C system to a new digital I&C system in support of control room modernization activities.« less

  19. Three MSC officials hold discussion in Mission Control room during Gemini 11

    NASA Image and Video Library

    1966-09-12

    S66-52754 (12 Sept. 1966) --- Three key Manned Spacecraft Center (MSC) officials hold discussion in the Mission Control room during Gemini-11 activity. Left to right, are Donald K. Slayton, MSC Director of Flight Crew Operations; astronaut Alan B. Shepard Jr., Chief, MSC Astronaut Office; and George M. Low, MSC Deputy Director. Photo credit: NASA

  20. Evaluating the effect of distractions in the operating room on clinical decision-making and patient safety.

    PubMed

    Murji, Ally; Luketic, Lea; Sobel, Mara L; Kulasegaram, Kulamakan Mahan; Leyland, Nicholas; Posner, Glenn

    2016-10-01

    Answering telephone calls and pagers is common distraction in the operating room. We sought to evaluate the impact of distractions on patient care by (1) assessing the accuracy and safety of responses to clinical questions posed to a surgeon while operating and (2) determining whether pager distractions affect simulation-based surgical performance. We conducted a randomized crossover study of obstetrics and gynecology residents. After studying a patient sign-out list, subjects performed a virtual salpingectomy. They were randomized to a distraction phase followed by quiet phase or vice versa. In the distraction phase, a pager beeped and subjects were asked questions based on the sign-out list. Accuracy of responses and the number of unsafe responses were recorded. In the quiet phase, trainees performed the task uninterrupted. Measures of surgical performance were successful task completion, time to task completion and operative blood loss. The mean score for correct responses to clinical questions during the distracted phase was 80 % (SD ±14 %). Nineteen residents (63 %) made at least 1 unsafe clinical decision while operating on the simulator (range 0-3). Subjects were more likely to successfully complete the surgical task in the allotted time under the quiet compared to distraction condition (OR 11.3, p = 0.03). There was no difference between the conditions in paired analysis for mean time (seconds) to task completion [426 (SD 133) vs. 440 (SD 186), p = 0.61] and mean operative blood loss (mL) [73.14 (SD 106) vs. 112.70 (SD 358), p = 0.47]. Distractions in the operating room may have a profound impact on patient safety on the wards. While multitasking in a simulated setting, the majority of residents made at least one unsafe clinical decision. Pager distractions also hindered surgical residents' ability to complete a simulated laparoscopic task in the allotted time without affecting other variables of surgical performance.

  1. Robotic assistance improves intracorporeal suturing performance and safety in the operating room while decreasing operator workload.

    PubMed

    Stefanidis, Dimitrios; Wang, Fikre; Korndorffer, James R; Dunne, J Bruce; Scott, Daniel J

    2010-02-01

    Intracorporeal suturing is one of the most difficult laparoscopic tasks. The purpose of this study was to assess the impact of robotic assistance on novice suturing performance, safety, and workload in the operating room. Medical students (n = 34), without prior laparoscopic suturing experience, were enrolled in an Institutional Review Board-approved, randomized protocol. After viewing an instructional video, subjects were tested in intracorporeal suturing on two identical, live, porcine Nissen fundoplication models; they placed three gastro-gastric sutures using conventional laparoscopic instruments in one model and using robotic assistance (da Vinci) in the other, in random order. Each knot was objectively scored based on time, accuracy, and security. Injuries to surrounding structures were recorded. Workload was assessed using the validated National Aeronautics and Space Administration (NASA) task load index (TLX) questionnaire, which measures the subjects' self-reported performance, effort, frustration, and mental, physical, and temporal demands of the task. Analysis was by paired t-test; p < 0.05 was considered significant. Compared with laparoscopy, robotic assistance enabled subjects to suture faster (595 +/- 22 s versus 459 +/- 137 s, respectively; p < 0.001), achieve higher overall scores (0 +/- 1 versus 95 +/- 128, respectively; p < 0.001), and commit fewer errors per knot (1.15 +/- 1.35 versus 0.05 +/- 0.26, respectively; p < 0.001). Subjects' overall score did not improve between the first and third attempt for laparoscopic suturing (0 +/- 0 versus 0 +/- 0; p = NS) but improved significantly for robotic suturing (49 +/- 100 versus 141 +/- 152; p < 0.001). Moreover, subjects indicated on the NASA-TLX scale that the task was more difficult to perform with laparoscopic instruments compared with robotic assistance (99 +/- 15 versus 57 +/- 23; p < 0.001). Compared with standard laparoscopy, robotic assistance significantly improved intracorporeal suturing

  2. Safety in the Chemical Laboratory: Fire Safety and Fire Control in the Chemistry Laboratory.

    ERIC Educational Resources Information Center

    Wilbraham, A. C.

    1979-01-01

    Discusses fire safety and fire control in the chemistry laboratory. The combustion process, extinguishing equipment, extinguisher maintenance and location, and fire safety and practices are included. (HM)

  3. Gesture-Controlled Interface for Contactless Control of Various Computer Programs with a Hooking-Based Keyboard and Mouse-Mapping Technique in the Operating Room

    PubMed Central

    Park, Ben Joonyeon; Jang, Taekjin; Choi, Jong Woo; Kim, Namkug

    2016-01-01

    We developed a contactless interface that exploits hand gestures to effectively control medical images in the operating room. We developed an in-house program called GestureHook that exploits message hooking techniques to convert gestures into specific functions. For quantitative evaluation of this program, we used gestures to control images of a dynamic biliary CT study and compared the results with those of a mouse (8.54 ± 1.77 s to 5.29 ± 1.00 s; p < 0.001) and measured the recognition rates of specific gestures and the success rates of tasks based on clinical scenarios. For clinical applications, this program was set up in the operating room to browse images for plastic surgery. A surgeon browsed images from three different programs: CT images from a PACS program, volume-rendered images from a 3D PACS program, and surgical planning photographs from a basic image viewing program. All programs could be seamlessly controlled by gestures and motions. This approach can control all operating room programs without source code modification and provide surgeons with a new way to safely browse through images and easily switch applications during surgical procedures. PMID:26981146

  4. Gesture-Controlled Interface for Contactless Control of Various Computer Programs with a Hooking-Based Keyboard and Mouse-Mapping Technique in the Operating Room.

    PubMed

    Park, Ben Joonyeon; Jang, Taekjin; Choi, Jong Woo; Kim, Namkug

    2016-01-01

    We developed a contactless interface that exploits hand gestures to effectively control medical images in the operating room. We developed an in-house program called GestureHook that exploits message hooking techniques to convert gestures into specific functions. For quantitative evaluation of this program, we used gestures to control images of a dynamic biliary CT study and compared the results with those of a mouse (8.54 ± 1.77 s to 5.29 ± 1.00 s; p < 0.001) and measured the recognition rates of specific gestures and the success rates of tasks based on clinical scenarios. For clinical applications, this program was set up in the operating room to browse images for plastic surgery. A surgeon browsed images from three different programs: CT images from a PACS program, volume-rendered images from a 3D PACS program, and surgical planning photographs from a basic image viewing program. All programs could be seamlessly controlled by gestures and motions. This approach can control all operating room programs without source code modification and provide surgeons with a new way to safely browse through images and easily switch applications during surgical procedures.

  5. Report: EPA’s Radiation and Indoor Environments National Laboratory Should Improve Its Computer Room Security Controls

    EPA Pesticide Factsheets

    Report #12-P-0847, September 21, 2012.Our review of the security posture and in-place environmental controls of EPA’s Radiation and Indoor Environments National Laboratory computer room disclosed an array of security and environmental control deficiencies.

  6. 15. NBS TOP SIDE CONTROL ROOM. THE SUIT SYSTEMS CONSOLE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. NBS TOP SIDE CONTROL ROOM. THE SUIT SYSTEMS CONSOLE IS USED TO CONTROL AIR FLOW AND WATER FLOW TO THE UNDERWATER SPACE SUIT DURING THE TEST. THE SUIT SYSTEMS ENGINEER MONITORS AIR FLOW ON THE PANEL TO THE LEFT, AND SUIT DATA ON THE COMPUTER MONITOR JUST SLIGHTLY TO HIS LEFT. WATER FLOW IS MONITORED ON THE PANEL JUST SLIGHTLY TO HIS RIGHT AND TEST VIDEO TO HIS FAR RIGHT. THE DECK CHIEF MONITORS THE DIVER'S DIVE TIMES ON THE COMPUTER IN THE UPPER RIGHT. THE DECK CHIEF LOGS THEM IN AS THEY ENTER THE WATER, AND LOGS THEM OUT AS THEY EXIT THE WATER. THE COMPUTER CALCULATES TOTAL DIVE TIME. - Marshall Space Flight Center, Neutral Buoyancy Simulator Facility, Rideout Road, Huntsville, Madison County, AL

  7. The 'Room within a Room' Concept for Monitored Warhead Dismantlement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tanner, Jennifer E.; Benz, Jacob M.; White, Helen

    2014-12-01

    Over the past 10 years, US and UK experts have engaged in a technical collaboration with the aim of improving scientific and technological abilities in support of potential future nuclear arms control and non-proliferation agreements. In 2011 a monitored dismantlement exercise provided an opportunity to develop and test potential monitoring technologies and approaches. The exercise followed a simulated nuclear object through a dismantlement process and looked to explore, with a level of realism, issues surrounding device and material monitoring, chain of custody, authentication and certification of equipment, data management and managed access. This paper focuses on the development and deploymentmore » of the ‘room-within-a-room’ system, which was designed to maintain chain of custody during disassembly operations. A key challenge for any verification regime operating within a nuclear weapon complex is to provide the monitoring party with the opportunity to gather sufficient evidence, whilst protecting sensitive or proliferative information held by the host. The requirement to address both monitoring and host party concerns led to a dual function design which: • Created a controlled boundary around the disassembly process area which could provide evidence of unauthorised diversion activities. • Shielded sensitive disassembly operations from monitoring party observation. The deployed room-within-a-room was an integrated system which combined a number of chain of custody technologies (i.e. cameras, tamper indicating panels and enclosures, seals, unique identifiers and radiation portals) and supporting deployment procedures. This paper discusses the bounding aims and constraints identified by the monitoring and host parties with respect to the disassembly phase, the design of the room-within-a-room system, lessons learned during deployment, conclusions and potential areas of future work. Overall it was agreed that the room-within-a-room approach was

  8. Light Water Reactor Sustainability Program Operator Performance Metrics for Control Room Modernization: A Practical Guide for Early Design Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald Boring; Roger Lew; Thomas Ulrich

    2014-03-01

    As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how themore » process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.« less

  9. KENNEDY SPACE CENTER, FLA. - A KSC employee uses a clean-air shower before entering a clean room. Streams of pressurized air directed at the occupant from nozzles in the chamber's ceiling and walls are designed to dislodge particulate matter from hair, clothing and shoes. The adhesive mat on the floor captures soil from shoe soles, as well as particles that fall on its surface. Particulate matter has the potential to contaminate the space flight hardware being stored or processed in the clean room. The shower is part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

    NASA Image and Video Library

    2003-08-29

    KENNEDY SPACE CENTER, FLA. - A KSC employee uses a clean-air shower before entering a clean room. Streams of pressurized air directed at the occupant from nozzles in the chamber's ceiling and walls are designed to dislodge particulate matter from hair, clothing and shoes. The adhesive mat on the floor captures soil from shoe soles, as well as particles that fall on its surface. Particulate matter has the potential to contaminate the space flight hardware being stored or processed in the clean room. The shower is part of KSC's Foreign Object Debris (FOD) control program, an important safety initiative.

  10. 1. VIEW OF THE CONTROL ROOM FOR THE XY RETRIEVER. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF THE CONTROL ROOM FOR THE X-Y RETRIEVER. USING THE X-Y RETRIEVER, OPERATORS RETRIEVED PLUTONIUM METAL FROM THE PLUTONIUM STORAGE VAULTS (IN MODULE K) AND CONVEYED IT TO THE X-Y SHUTTLE AREA WHERE IT WAS CUT AND WEIGHED. FROM THE SHUTTLE AREA THE PLUTONIUM WAS CONVEYED TO MODULES A, J OR K FOR CASTING, OR MODULE B FOR ROLLING AND FORMING. (5/17/71) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  11. Supervisory Control and Data Acquisition System | Energy Systems

    Science.gov Websites

    Integration Facility | NREL Supervisory Control and Data Acquisition System Supervisory Control supervisory control and data acquisition (SCADA) system monitors and controls safety systems and gathers real Energy Systems Integration Facility control room. The Energy Systems Integration Facility's SCADA system

  12. Advantages and Disadvantages of Physiological Assessment For Next Generation Control Room Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuan Q. Tran; Ronald L. Boring; Donald D. Dudenhoeffer

    2007-08-01

    Abstract - We propose using non-obtrusive physiological assessment (e.g., eye tracking,) to assess human information processing errors (e.g., loss of vigilance) and limitations (e.g., workload) for advanced energy systems early in the design process. This physiological approach for assessing risk will circumvent many limitations of current risk methodologies such as subjective rating (e.g., rater’s biases) and performance modeling (e.g., risk assessment is scripted and is based upon the individual modeler’s judgment). Key uses will be to evaluate (early in the design process) novel control room equipment and configurations as well as newly developed automated systems that will inevitably place amore » high information load on operators. The physiological risk assessment tool will allow better precision in pinpointing problematic design issues and will provide a “real-time” assessment of risk. Furthermore, this physiological approach would extend the state-of-the-art of human reliability methods from a “static” measure to more “dynamic.” This paper will discuss a broad range of the current popular online performance gauges as well as its advantages and disadvantages for use in next generation control room.« less

  13. Perceived Parental Care and Control among Israeli Female Adolescents Presenting to Emergency Rooms after Self-Poisoning

    ERIC Educational Resources Information Center

    Diamond, Gary M.; Didner, Hila; Waniel, Ariela; Priel, Beatriz; Asherov, Jack; Arbel, Shosh

    2005-01-01

    Levels of perceived parental care and control among 24 female Israeli adolescents presenting at emergency rooms after a self-poisoning act of low lethality were compared to those found among 23 non-self-harming, community controls. Adolescents' perceived levels of parental care and control were measured via both adolescents' self-report and…

  14. Light room therapy effective in mild forms of seasonal affective disorder--a randomised controlled study.

    PubMed

    Rastad, C; Ulfberg, J; Lindberg, P

    2008-06-01

    The most common way to provide bright light therapy to Swedish patients with Seasonal Affective Disorder (SAD), is treatment in a light therapy room. Since few studies have evaluated treatment provided in this setting and few have evaluated the effect of bright light in sub-clinical SAD (S-SAD), such a study including a one-month follow-up was designed. Fifty adults recruited from a previous prevalence study and clinically assessed as having SAD or S-SAD, were randomised to treatment in a light room or to a three-week waiting-list control group. The Hamilton Depression Rating Scale-Seasonal Affective Disorders Self-rating 29-items Version (SIGH-SAD/SR) was used to measure depressive mood at baseline, directly following treatment and at the one-month follow-up. ANCOVA with adjustment for baseline depression score, showed a significant main effect for the light room therapy group (p<0.001). Fifty-four percent (n=13/24) improved > or = 50% while no such improvement was seen in the control condition (n=0/24). After merging the two groups, repeated measures ANOVA confirmed the experimental analysis (p<0.001). At the one-month follow-up, 83.0% (n=39/47) had improved > or = 50% and 63.8% (n=30/47) had normal depression scores, i.e. < or = 8. Light room therapy was effective in reducing depressive symptoms in subjects with winter depressive mood. Results were maintained over a period of one month.

  15. ATLAS Virtual Visits: Bringing the World into the ATLAS Control Room

    NASA Astrophysics Data System (ADS)

    Goldfarb, S.

    2012-12-01

    The newfound ability of Social Media to transform public communication back to a conversational nature provides HEP with a powerful tool for Outreach and Communication. By far, the most effective component of nearly any visit or public event is that fact that the students, teachers, media, and members of the public have a chance to meet and converse with real scientists. While more than 30,000 visitors passed through the ATLAS Visitor Centre in 2011, nearly 7 billion did not have a chance to make the trip. Clearly this is not for lack of interest. Rather, the costs of travel, in terms of time and money, and limited parking, put that number somewhat out of reach. On the other hand, during the LHC “First Physics” event of 2010, more than 2 million visitors joined the experiment control rooms via webcast for the celebration. This document presents a project developed for the ATLAS Experiment's Outreach and Education program that complements the webcast infrastructure with video conferencing and wireless sound systems, allowing the public to interact with hosts in the control room with minimal disturbance to the shifters. These “Virtual Visits” have included high school classes, LHC Masterclasses, conferences, expositions and other events in Europe, USA, Japan and Australia, to name a few. We discuss the technology used, potential pitfalls (and ways to avoid them), and our plans for the future.

  16. APOLLO XIII CREW - MISSION OPERATIONS CONTROL ROOM (MOCR) - APOLLO XII - LUNAR EXTRAVEHICULAR ACTIVITY (EVA) - MSC

    NASA Image and Video Library

    1969-11-21

    S69-59525 (19 Nov. 1969) --- Overall view of activity in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, during the Apollo 12 lunar landing mission. When this picture was made the first Apollo 12 extravehicular activity (EVA) was being televised from the surface of the moon. Photo credit: NASA

  17. Safety of Running Two Rooms: A Systematic Review and Meta-Analysis of Overlapping Neurosurgical Procedures.

    PubMed

    Self, D Mitchell; Ilyas, Adeel; Stetler, William R

    2018-04-27

    Overlapping surgery, a long-standing practice within academic neurosurgery centers nationwide, has recently come under scrutiny from the government and media as potentially harmful to patients. Therefore, the objective of this systematic review and meta-analysis is to determine the safety of overlapping neurosurgical procedures. The authors performed a systematic review and meta-analysis in accordance with PRISMA guidelines. A review of PubMed and Medline databases was undertaken with the search phrase "overlapping surgery AND neurosurgery AND outcomes." Data regarding patient demographics, type of neurosurgical procedure, and outcomes and complications were extracted from each study. The principle summary measure was odds ratio (OR) of the association of overlapping versus non-overlapping surgery with outcomes. The literature search yielded a total of 36 studies, of which 5 studies met inclusion criteria and were included in this study. These studies included a total of 25,764 patients undergoing neurosurgical procedures. Overlapping surgery was associated with an increased likelihood of being discharged home (OR = 1.32; 95% CI 1.20 to 1.44; P < 0.001) and a reduced 30-day unexpected return to the operating room (OR = 0.79; 95% CI 0.72 to 0.87; P < 0.001). Overlapping surgery did not significantly affect OR of length of surgery, 30-day mortality, or 30-day readmission. Overlapping neurosurgical procedures were not associated with worse patient outcomes. Additional, prospective studies are needed to further assess the safety overlapping procedures. Copyright © 2018. Published by Elsevier Inc.

  18. 9 CFR 590.520 - Breaking room facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Breaking room facilities. 590.520 Section 590.520 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE..., clean towels or other facilities for drying hands, odorless soap, and containers for used towels. Hand...

  19. Color coding of control room displays: the psychocartography of visual layering effects.

    PubMed

    Van Laar, Darren; Deshe, Ofer

    2007-06-01

    To evaluate which of three color coding methods (monochrome, maximally discriminable, and visual layering) used to code four types of control room display format (bars, tables, trend, mimic) was superior in two classes of task (search, compare). It has recently been shown that color coding of visual layers, as used in cartography, may be used to color code any type of information display, but this has yet to be fully evaluated. Twenty-four people took part in a 2 (task) x 3 (coding method) x 4 (format) wholly repeated measures design. The dependent variables assessed were target location reaction time, error rates, workload, and subjective feedback. Overall, the visual layers coding method produced significantly faster reaction times than did the maximally discriminable and the monochrome methods for both the search and compare tasks. No significant difference in errors was observed between conditions for either task type. Significantly less perceived workload was experienced with the visual layers coding method, which was also rated more highly than the other coding methods on a 14-item visual display quality questionnaire. The visual layers coding method is superior to other color coding methods for control room displays when the method supports the user's task. The visual layers color coding method has wide applicability to the design of all complex information displays utilizing color coding, from the most maplike (e.g., air traffic control) to the most abstract (e.g., abstracted ecological display).

  20. Human factor engineering based design and modernization of control rooms with new I and C systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larraz, J.; Rejas, L.; Ortega, F.

    2012-07-01

    Instrumentation and Control (I and C) systems of the latest nuclear power plants are based on the use of digital technology, distributed control systems and the integration of information in data networks (Distributed Control and Instrumentation Systems). This has a repercussion on Control Rooms (CRs), where the operations and monitoring interfaces correspond to these systems. These technologies are also used in modernizing I and C systems in currently operative nuclear power plants. The new interfaces provide additional capabilities for operation and supervision, as well as a high degree of flexibility, versatility and reliability. An example of this is the implementationmore » of solutions such as compact stations, high level supervision screens, overview displays, computerized procedures, new operational support systems or intelligent alarms processing systems in the modernized Man-Machine Interface (MMI). These changes in the MMI are accompanied by newly added Software (SW) controls and new solutions in automation. Tecnatom has been leading various projects in this area for several years, both in Asian countries and in the United States, using in all cases international standards from which Tecnatom own methodologies have been developed and optimized. The experience acquired in applying this methodology to the design of new control rooms is to a large extent applicable also to the modernization of current control rooms. An adequate design of the interface between the operator and the systems will facilitate safe operation, contribute to the prompt identification of problems and help in the distribution of tasks and communications between the different members of the operating shift. Based on Tecnatom experience in the field, this article presents the methodological approach used as well as the most relevant aspects of this kind of project. (authors)« less

  1. An Assessment of Levels of Safety in Psychiatric Units.

    PubMed

    Bayramzadeh, Sara

    2017-01-01

    This article aims to understand the incident patterns in relation to different types of spaces within a psychiatric unit, which are discussed using the five levels of safety framework. Implementing measures to improve patient safety is essential particularly in a psychiatric hospital, where limited research has been conducted on inpatient safety. Therefore, this article aims to understand the incident patterns from the lens of the five levels of safety framework, which categorizes spaces according to the level of patient supervision in psychiatric facilities, as follows: service areas, corridors, dayrooms, patient rooms and bathrooms, seclusions and admissions. In an 81-bed psychiatric hospital, this mixed-method study drew 7 years of incident reports and caregivers' perceptions gathered through focus groups. Incident reports on physical safety were analyzed based on the five levels of safety framework ( N = 1,316). Focus groups ( n = 9) explored the caregivers' viewpoints on patient safety and five categories of spaces. Overall findings support the five levels of safety pattern, confirming that most incidents occurred in patient rooms and bathrooms; moreover, relatively fewer incidents happened in dayrooms and corridors. Elopements are higher in hallways and dayrooms. Suicide is most common in patient rooms and bathrooms, and violence is more frequent in dayrooms. Focus groups results yielded insightful recommendations. Levels of safety framework can be adapted to seven categories where seclusion room and admission area would be two of the spaces with least incidents.

  2. Radiation safety for anaesthesia providers in the orthopaedic operating room.

    PubMed

    Rhea, E B; Rogers, T H; Riehl, J T

    2016-04-01

    In many orthopaedic operating rooms, anaesthesia providers routinely wear lead aprons for protection from radiation, but some studies have questioned whether this is needed. We conducted a systematic review to identify studies that measured the amount of radiation that anaesthetists were exposed to in the orthopaedic operating room. Multiple studies have shown that at 1.5 m from the source of radiation, anaesthetists received no radiation, or amounts so small that a person would have to be present in an unreasonable number of operations to receive cumulative doses of any significance. Radiation doses at this distance were often at the limits of the sensitivity of the measuring dosimeter. We question the need to wear lead protection for anaesthesia providers who are routinely at 1.5 m or a greater distance from standard fluoroscopy units. © 2016 The Association of Anaesthetists of Great Britain and Ireland.

  3. The evaluation the magnitude radiation exposure dose rate in digital radiography room design

    NASA Astrophysics Data System (ADS)

    Dwiyanto, Agung; Setia Budi, Wahyu; Hardiman, Gagoek

    2017-12-01

    This study discusses the dose rate in digital radiography room, buit according to meet the provisions of KEMENKES No.1014 / Menkes / SK / XI / 2008 and Regulation of BAPETEN No. 8 / 2011. The provisions primary concern of radiation safety, not comfort, by considering the space design. There are five aspects to consider in designing the space: functionality, comfort, security, movement activities and aesthetics. However provisions only met three aspects of the design, which are a function, security and movement activity. Therefore, it is necessary to evaluate digital radiography room in terms of its ability to control external radiation exposure to be safe and comfortable The dose rate is measured by the range of primary and secondary radiation in the observation points by using Surveymeter. All data are obtained by the preliminary survey prior to the study. Furthermore, the review of digital radiography room is done based on architectural design theory. The dose rate for recommended improvement room is recalculated using the same method as the actual room with the help of computer modeling. The result of dose rate calculation at the inner and outer part of digital radiography observation room shows that in-room dose for a week at each measuring point exceeds the allowable dose limit both for staff and public. During a week of observation, the outdoor dose at some measuring points exceeds the dose limit set by the KEMENKES No.1014 / Menkes / SK / XI / 2008 and Regulation BEPETEN No 8/2011. Meanwhile, the result of dose rate calculation in the inner and outer part of the improved digital radiography room can meet the applicable regulations better.

  4. Quasi-Solid-State Rechargeable Li-O2 Batteries with High Safety and Long Cycle Life at Room Temperature.

    PubMed

    Cho, Sung Man; Shim, Jimin; Cho, Sung Ho; Kim, Jiwoong; Son, Byung Dae; Lee, Jong-Chan; Yoon, Woo Young

    2018-05-09

    As interest in electric vehicles and mass energy storage systems continues to grow, Li-O 2 batteries are attracting much attention as a candidate for next-generation energy storage systems owing to their high energy density. However, safety problems related to the use of lithium metal anodes have hampered the commercialization of Li-O 2 batteries. Herein, we introduced a quasi-solid polymer electrolyte with excellent electrochemical, chemical, and thermal stabilities into Li-O 2 batteries. The ion-conducting QSPE was prepared by gelling a polymer network matrix consisting of poly(ethylene glycol) methyl ether methacrylate, methacrylated tannic acid, lithium trifluoromethanesulfonate, and nanofumed silica with a small amount of liquid electrolyte. The quasi-solid-state Li-O 2 cell consisted of a lithium powder anode, a quasi-solid polymer electrolyte, and a Pd 3 Co/multiwalled carbon nanotube cathode, which enhanced the electrochemical performance of the cell. This cell, which exhibited improved safety owing to the suppression of lithium dendrite growth, achieved a lifetime of 125 cycles at room temperature. These results show that the introduction of a quasi-solid electrolyte is a potentially new alternative for the commercialization of solid-state Li-O 2 batteries.

  5. Seismometer reading viewed in ALSEP Room in Misson Control during Apollo 17

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The seismometer readings from the impact made by the Apollo 17 Saturn S-IVB stage when it struck the lunar surface are viewed in the ALSEP Room in the Misson Control Center at Houston by Dr. Maurice Ewing, professor of geophysics of the Universtiy of Texas at Galveston. The seismic tracings are from sensings made by seismometers of Apollo Lunar Surface Experiments Packages left on the Moon during earlier Apollo lunar landing missions.

  6. The Ground Control Room as an Enabling Technology in the Unmanned Aerial System

    NASA Technical Reports Server (NTRS)

    Gear, Gary; Mace, Thomas

    2007-01-01

    This viewgraph presentation reviews the development of the ground control room as an required technology for the use of an Unmanned Aerial system. The Unmanned Aerial system is a strategic component of the Global Observing System, which will serve global science needs. The unmanned aerial system will use the same airspace as manned aircraft, therefore there will be unique telemetry needs.

  7. Safety in the operating room during orthopedic trauma surgery-incidence of adverse events related to technical equipment and logistics.

    PubMed

    van Delft, E A K; Schepers, T; Bonjer, H J; Kerkhoffs, G M M J; Goslings, J C; Schep, N W L

    2018-04-01

    Safety in the operating room is widely debated. Adverse events during surgery are potentially dangerous for the patient and staff. The incidence of adverse events during orthopedic trauma surgery is unknown. Therefore, we performed a study to quantify the incidence of these adverse events. Primary objective was to determine the incidence of adverse events related to technical equipment and logistics. The secondary objective was to evaluate the consequences of these adverse events. We completed a cross-sectional observational study to assess the incidence, consequences and preventability of adverse events related to technical equipment and logistics during orthopedic trauma surgery. During a 10 week period, all orthopedic trauma operations were evaluated by an observer. Six types of procedures were differentiated: osteosynthesis; arthroscopy; removal of hardware; joint replacement; bone grafting and other. Adverse events were divided in six categories: staff dependent factors; patient dependent factors; anaesthesia; imaging equipment; operation room equipment and instruments and implants. Adverse events were defined as any factor affecting the surgical procedure in a negative way. Hundred-fifty operative procedures were included. In 54% of the procedures, at least one adverse event occurred. In total, 147 adverse events occurred, with a range of 1-5 per procedure. Most adverse events occurred during joint replacement procedures. Thirty-seven percent of the incidents concerned defect, incorrect connected or absent instruments. In 36% of the procedures adverse events resulted in a prolonged operation time with a median prolongation of 10.0 min. In more than half of orthopedic trauma surgical procedures adverse events related to technical equipment and logistics occurred, most of them could easily be prevented. These adverse events could endanger the safety of the patient and staff and should therefore be reduced. 4.

  8. Industrial Safety Training for Soviet Workers.

    ERIC Educational Resources Information Center

    Semenov, A.

    1978-01-01

    Various forms of worker training in industrial safety in the Soviet Union are described by a Soviet labor inspector, with special "industrial safety rooms" the principal means of inplant instruction. Safety education in vocational schools and "people's universities" is also touched on. (MF)

  9. 9 CFR 590.520 - Breaking room facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Breaking room facilities. 590.520 Section 590.520 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... least 30 foot-candles of light on all working surfaces except that light intensity shall be at least 50...

  10. Risk and safety of pediatric sedation/anesthesia for procedures outside the operating room.

    PubMed

    Cravero, Joseph P

    2009-08-01

    Sedation and anesthesia outside the operating room represents a rapidly growing field of practice that involves a number of different specialty providers including anesthesiology. The literature surrounding this work is found in a variety of journals - many outside anesthesiology. This review is intended to inform readers about the current status of risk and safety involving sedation/anesthesia for tests and minor procedures utilizing a wide range of sources. Two large database studies have helped to define the frequency and nature of adverse events in pediatric sedation/anesthesia practice from a multispecialty perspective. A number of papers describing respiratory and hemodynamic aspects of dexmedetomidine sedation have also been published. Finally, a number of studies relating to training sedation providers, reporting of sedation adverse events, sedation for vulnerable populations, and (in particular) ketamine sedation adverse respiratory events have also come to light. The latest publications continue to document a relatively low risk to pediatric sedation yet also warn us about the potential adverse events in this field. The results help to define competencies required to deliver pediatric sedation and make this practice even safer. Particularly interesting are new jargon and methodologies for defining adverse events and the use of new methods for training sedation providers.

  11. Report: EPA’s Office of Environmental Information Should Improve Ariel Rios and Potomac Yard Computer Room Security Controls

    EPA Pesticide Factsheets

    Report #12-P-0879, September 26, 2012. The security posture and in-place environmental control review of the computer rooms in the Ariel Rios and Potomac Yard buildings revealed numerous security and environmental control deficiencies.

  12. 30 CFR 7.103 - Safety system control test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... control that might interfere with the evaluation of the operation of the exhaust gas temperature sensor... allowable low water level. Run the engine until the exhaust gas temperature sensor activates the safety...

  13. 30 CFR 7.103 - Safety system control test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... control that might interfere with the evaluation of the operation of the exhaust gas temperature sensor... allowable low water level. Run the engine until the exhaust gas temperature sensor activates the safety...

  14. VIEW OF WEST BANK OF “SAFETY ROD PACKAGE,” INCLUDING SAFETY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF WEST BANK OF “SAFETY ROD PACKAGE,” INCLUDING SAFETY ROD MOTOR DRIVES (B AND C), DRUMS, AND CLUTCHES, IN A THREE-TIERED RACK IN THE PDP ROOM AT LEVEL +27’, LOOKING SOUTHWEST - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  15. VIEW OF EAST BANK OF “SAFETY ROD PACKAGE,” INCLUDING SAFETY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF EAST BANK OF “SAFETY ROD PACKAGE,” INCLUDING SAFETY ROD MOTOR DRIVES (B AND C), DRUMS, AND CLUTCHES, IN A THREE-TIERED RACK IN THE PDP ROOM AT LEVEL +27’, LOOKING SOUTHEAST - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC

  16. 69. DETAIL OF OPERATIONS AND CHECKOUT (POWER CONTROL AND MONITOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    69. DETAIL OF OPERATIONS AND CHECKOUT (POWER CONTROL AND MONITOR PANEL) AND RANGE SAFETY (DESTRUCT SYSTEM CONTROL MONITOR PANEL) PANELS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  17. Patient safety and infection control: bases for curricular integration.

    PubMed

    Silva, Andréa Mara Bernardes da; Bim, Lucas Lazarini; Bim, Felipe Lazarini; Sousa, Alvaro Francisco Lopes; Domingues, Pedro Castania Amadio; Nicolussi, Adriana Cristina; Andrade, Denise de

    2018-05-01

    To analyze curricular integration between teaching of patient safety and good infection prevention and control practices. Integrative review, designed to answer the question: "How does curricular integration of content about 'patient safety teaching' and content about 'infection prevention and control practices' occur in undergraduate courses in the health field?". The following databases were searched for primary studies: CINAHL, LILACS, ScienceDirect, Web of Science, Scopus, Europe PMC and MEDLINE. The final sample consisted of 13 studies. After content analysis, primary studies were grouped into two subject categories: "Innovative teaching practices" and "Curricular evaluation. Patient safety related to infection prevention and control practices is present in the curriculum of health undergraduate courses, but is not coordinated with other themes, is taught sporadically, and focuses mainly on hand hygiene.

  18. New thinking for the boiler room.

    PubMed

    Rose, Wayne

    2008-09-01

    Wayne Rose, marketing manager at integrated plant room manufacturer Armstrong Integrated Systems, explains how increasing use of off-site manufacture, the latest 3D modelling technology, and advances in control technology, are revolutionising boiler room design and construction.

  19. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  20. Microbial Load in Septic and Aseptic Procedure Rooms.

    PubMed

    Harnoss, Julian-Camill; Assadian, Ojan; Diener, Markus Karl; Müller, Thomas; Baguhl, Romy; Dettenkofer, Markus; Scheerer, Lukas; Kohlmann, Thomas; Heidecke, Claus-Dieter; Gessner, Stephan; Büchler, Markus Wolfgang; Kramer, Axel

    2017-07-10

    Highly effective measures to prevent surgical wound infections have been established over the last two decades. We studied whether the strict separation of septic and aseptic procedure rooms is still necessary. In an exploratory, prospective observational study, the microbial concentration in an operating room without a room ventilating system (RVS) was analyzed during 16 septic and 14 aseptic operations with the aid of an air sampler (50 cm and 1 m from the operative field) and sedimentation plates (1 m from the operative field, and contact culture on the walls). The means and standard deviations of the microbial loads were compared with the aid of GEE models (generalized estimation equations). In the comparison of septic and aseptic operations, no relevant differences were found with respect to the overall microbial concentration in the room air (401.7 ± 176.3 versus 388.2 ± 178.3 CFU/m 3 ; p = 0.692 [CFU, colony-forming units]) or sedimentation 1 m from the operative field (45.3 ± 22.0 versus 48.7 ± 18.5 CFU/m 2 /min; p = 0.603) and on the walls (35.7 ± 43.7 versus 29.0 ± 49.4 CFU/m 2 /min; p = 0.685). The only relevant differences between the microbial spectra associated with the two types of procedure were a small amount of sedimentation of Escherichia coli and Enterococcus faecalis in septic operations, and of staphylococcus aureus and pseudomonas stutzeri in aseptic operations, up to 30 minutes after the end of the procedure. These data do not suggest that septic and aseptic procedure rooms need to be separated. In interpreting the findings, one should recall that the study was not planned as an equivalence or non-inferiority study. Wherever patient safety is concerned, high-level safety concepts should only be demoted to lower levels if new and convincing evidence becomes available.

  1. OHS Redecorates Exam Rooms to Educate Patients | Poster

    Cancer.gov

    Occupational Health Services interns are educating patients during their visits via updated exam rooms that now display health-related “themes” like cancer, general health, mental health, and travel safety. They hope the vibrant designs and intriguing facts they’ve displayed will attract attention and benefit patients.

  2. Factors Affecting Acoustics and Speech Intelligibility in the Operating Room: Size Matters.

    PubMed

    McNeer, Richard R; Bennett, Christopher L; Horn, Danielle Bodzin; Dudaryk, Roman

    2017-06-01

    Noise in health care settings has increased since 1960 and represents a significant source of dissatisfaction among staff and patients and risk to patient safety. Operating rooms (ORs) in which effective communication is crucial are particularly noisy. Speech intelligibility is impacted by noise, room architecture, and acoustics. For example, sound reverberation time (RT60) increases with room size, which can negatively impact intelligibility, while room objects are hypothesized to have the opposite effect. We explored these relationships by investigating room construction and acoustics of the surgical suites at our institution. We studied our ORs during times of nonuse. Room dimensions were measured to calculate room volumes (VR). Room content was assessed by estimating size and assigning items into 5 volume categories to arrive at an adjusted room content volume (VC) metric. Psychoacoustic analyses were performed by playing sweep tones from a speaker and recording the impulse responses (ie, resulting sound fields) from 3 locations in each room. The recordings were used to calculate 6 psychoacoustic indices of intelligibility. Multiple linear regression was performed using VR and VC as predictor variables and each intelligibility index as an outcome variable. A total of 40 ORs were studied. The surgical suites were characterized by a large degree of construction and surface finish heterogeneity and varied in size from 71.2 to 196.4 m (average VR = 131.1 [34.2] m). An insignificant correlation was observed between VR and VC (Pearson correlation = 0.223, P = .166). Multiple linear regression model fits and β coefficients for VR were highly significant for each of the intelligibility indices and were best for RT60 (R = 0.666, F(2, 37) = 39.9, P < .0001). For Dmax (maximum distance where there is <15% loss of consonant articulation), both VR and VC β coefficients were significant. For RT60 and Dmax, after controlling for VC, partial correlations were 0.825 (P

  3. Factors Affecting Acoustics and Speech Intelligibility in the Operating Room: Size Matters

    PubMed Central

    Bennett, Christopher L.; Horn, Danielle Bodzin; Dudaryk, Roman

    2017-01-01

    INTRODUCTION: Noise in health care settings has increased since 1960 and represents a significant source of dissatisfaction among staff and patients and risk to patient safety. Operating rooms (ORs) in which effective communication is crucial are particularly noisy. Speech intelligibility is impacted by noise, room architecture, and acoustics. For example, sound reverberation time (RT60) increases with room size, which can negatively impact intelligibility, while room objects are hypothesized to have the opposite effect. We explored these relationships by investigating room construction and acoustics of the surgical suites at our institution. METHODS: We studied our ORs during times of nonuse. Room dimensions were measured to calculate room volumes (VR). Room content was assessed by estimating size and assigning items into 5 volume categories to arrive at an adjusted room content volume (VC) metric. Psychoacoustic analyses were performed by playing sweep tones from a speaker and recording the impulse responses (ie, resulting sound fields) from 3 locations in each room. The recordings were used to calculate 6 psychoacoustic indices of intelligibility. Multiple linear regression was performed using VR and VC as predictor variables and each intelligibility index as an outcome variable. RESULTS: A total of 40 ORs were studied. The surgical suites were characterized by a large degree of construction and surface finish heterogeneity and varied in size from 71.2 to 196.4 m3 (average VR = 131.1 [34.2] m3). An insignificant correlation was observed between VR and VC (Pearson correlation = 0.223, P = .166). Multiple linear regression model fits and β coefficients for VR were highly significant for each of the intelligibility indices and were best for RT60 (R2 = 0.666, F(2, 37) = 39.9, P < .0001). For Dmax (maximum distance where there is <15% loss of consonant articulation), both VR and VC β coefficients were significant. For RT60 and Dmax, after controlling for VC

  4. Patient safety room of horrors: a novel method to assess medical students and entering residents' ability to identify hazards of hospitalisation.

    PubMed

    Farnan, Jeanne M; Gaffney, Sean; Poston, Jason T; Slawinski, Kris; Cappaert, Melissa; Kamin, Barry; Arora, Vineet M

    2016-03-01

    Patient safety curricula in undergraduate medical education (UME) are often didactic format with little focus on skills training. Despite recent focus on safety, practical training in residency education is also lacking. Assessments of safety skills in UME and graduate medical education (GME) are generally knowledge, and not application-focused. We aimed to develop and pilot a safety-focused simulation with medical students and interns to assess knowledge regarding hazards of hospitalisation. A simulation demonstrating common hospital-based safety threats was designed. A case scenario was created including salient patient information and simulated safety threats such as the use of upper-extremity restraints and medication errors. After entering the room and reviewing the mock chart, learners were timed and asked to identify and document as many safety hazards as possible. Learner satisfaction was assessed using constructed-response evaluation. Descriptive statistics, including per cent correct and mean correct hazards, were performed. All 86 third-year medical students completed the encounter. Some hazards were identified by a majority of students (fall risk, 83% of students) while others were rarely identified (absence of deep venous thrombosis prophylaxis, 13% of students). Only 5% of students correctly identified pressure ulcer risk. 128 of 131 interns representing 49 medical schools participated in the GME implementation. Incoming interns were able to identify a mean of 5.1 hazards out of the 9 displayed (SD 1.4) with 40% identifying restraints as a hazard, and 20% identifying the inappropriate urinary catheter as a hazard. A simulation showcasing safety hazards was a feasible and effective way to introduce trainees to safety-focused content. Both students and interns had difficulty identifying common hazards of hospitalisation. Despite poor performance, learners appreciated the interactive experience and its clinical utility. Published by the BMJ Publishing

  5. Ambient noise levels in industrial audiometric test rooms.

    PubMed

    Frank, T; Williams, D L

    1994-05-01

    In 1983 the Occupational Safety and Health Administration (OSHA) specified maximum permissible ambient noise levels (MPANLs) that would allow valid hearing threshold measurements in an audiometric test room. However, ambient noise sound pressure levels (SPLs) in rooms used for industrial hearing tests are unknown. The present study reports octave band (125 to 8000 Hz) ambient noise SPLs measured in 490 single-walled prefabricated audiometric test rooms located in industrial settings that were obtained from eight sources. The ambient noise SPLs were highest in the lower frequencies and decreased as frequency increased. All 490 rooms met the OSHA MPANLs. Fortunately, the ambient noise SPLs were considerably lower than the OSHA MPANLs, since previous research has demonstrated that hearing thresholds cannot be obtained down to 0-dB HL in a test room having ambient noise levels equal to the OSHA MPANLs. In fact, 33%, or 162 of the 490 test rooms, met the more stringent MPANLs recently specified by the American National Standards Institute (ANSI) for industrial hearing testing. Given that the OSHA MPANLs are too high and that the test room ambient noise SPLs were considerably less than the OSHA MPANLs, that authors recommend that the OSHA MPANLs be revised to the more stringent ANSI 1991 MPANLs so that hearing thresholds for baseline and annual audiograms can be measured down to 0-dB HL.

  6. [Infection control and safety culture in German hospitals].

    PubMed

    Hansen, Sonja; Schwab, Frank; Gropmann, Alexander; Behnke, Michael; Gastmeier, Petra

    2016-07-01

    Healthcare-associated infections (HAI) are the most frequent adverse events in the healthcare setting and their prevention is an important contribution to patient safety in hospitals. To analyse to what extent safety cultural aspects with relevance to infection control are implemented in German hospitals. Safety cultural aspects of infection control were surveyed with an online questionnaire; data were analysed descriptively. Data from 543 hospitals with a median of [IQR] 275 [157; 453] beds were analysed. Almost all hospitals (96.6 %) had internal guidelines for infection control (IC) in place; 82 % defined IC objectives, most often regarding hand hygiene (HH) (93 %) and multidrug resistant organisms (72 %) and less frequently for antibiotic stewardship (48 %) or prevention of specific HAI. In 94 % of hospitals, a reporting system for adverse events was in place, which was also used to report low compliance with HH, outbreaks and Clostridium difficile-associated infections. Members of the IC team were most often seen to hold daily responsibility for IC in the hospital, but rarely other hospital staff (94 versus 19 %). Safety cultural aspects are not fully implemented in German hospitals. IC should be more strongly implemented in healthcare workers' daily routine and more visibly supported by hospital management.

  7. Verification and Implementation of Operations Safety Controls for Flight Missions

    NASA Technical Reports Server (NTRS)

    Smalls, James R.; Jones, Cheryl L.; Carrier, Alicia S.

    2010-01-01

    There are several engineering disciplines, such as reliability, supportability, quality assurance, human factors, risk management, safety, etc. Safety is an extremely important engineering specialty within NASA, and the consequence involving a loss of crew is considered a catastrophic event. Safety is not difficult to achieve when properly integrated at the beginning of each space systems project/start of mission planning. The key is to ensure proper handling of safety verification throughout each flight/mission phase. Today, Safety and Mission Assurance (S&MA) operations engineers continue to conduct these flight product reviews across all open flight products. As such, these reviews help ensure that each mission is accomplished with safety requirements along with controls heavily embedded in applicable flight products. Most importantly, the S&MA operations engineers are required to look for important design and operations controls so that safety is strictly adhered to as well as reflected in the final flight product.

  8. Market-based control mechanisms for patient safety

    PubMed Central

    Coiera, E; Braithwaite, J

    2009-01-01

    A new model is proposed for enhancing patient safety using market-based control (MBC), inspired by successful approaches to environmental governance. Emissions trading, enshrined in the Kyoto protocol, set a carbon price and created a carbon market—is it possible to set a patient safety price and let the marketplace find ways of reducing clinically adverse events? To “cap and trade,” a regulator would need to establish system-wide and organisation-specific targets, based on the cost of adverse events, create a safety market for trading safety credits and then police the market. Organisations are given a clear policy signal to reduce adverse event rates, are told by how much, but are free to find mechanisms best suited to their local needs. The market would inevitably generate novel ways of creating safety credits, and accountability becomes hard to evade when adverse events are explicitly measured and accounted for in an organisation’s bottom line. PMID:19342522

  9. Assessment of Safety Standards for Automotive Electronic Control Systems

    DOT National Transportation Integrated Search

    2016-06-01

    This report summarizes the results of a study that assessed and compared six industry and government safety standards relevant to the safety and reliability of automotive electronic control systems. These standards include ISO 26262 (Road Vehicles - ...

  10. Firing Room 2 in Launch Control Center at KSC during Apollo 9 countdown test

    NASA Image and Video Library

    1969-02-23

    S69-25880 (23 Feb. 1969) --- Overall view of Firing Room 2 in the Launch Control Center, Launch Complex 39, Kennedy Space Center, during an Apollo 9 Countdown Demonstration Test. Astronauts James A. McDivitt, David R. Scott, and Russell L. Schweickart were participating in a training exercise in preparation for their scheduled 10-day Earth-orbital space mission.

  11. Current State of Overlapping, Concurrent, and Multiple-Room Surgery in Otolaryngology: A National Survey.

    PubMed

    Cognetti, David M; Nussenbaum, Brian; Brenner, Michael J; Chi, David H; McCormick, Michael E; Venkatraman, Giri; Zhan, Tingting; McKinlay, Alex J

    2017-12-01

    Objective Multiple-room surgery has gained attention due to reports in the lay press scrutinizing the activity, with hospitals and the government collecting data on current practice. We studied practices and attitudes toward multiple-room surgery in otolaryngology. Methods A survey was developed by members of the Patient Safety and Quality Improvement Committee of the American Academy of Otolaryngology-Head and Neck Surgery. The survey was distributed to members of the Academy and included questions on demographics, current practices, and opinions regarding multiple-room surgery. The survey was designed to capture the spectrum of multidisciplinary, overlapping, and simultaneous/concurrent surgery practices. Data were collected via SurveyMonkey. Results A total of 907 of 9520 members completed the survey. Of the respondents, 40.4% reported performing some form of multiple-room surgery. Multiple-room surgery is more common amongst subspecialists than general otolaryngologists. Most believed that regulations disallowing multiple-room surgery would result in an increase in late starts (73.5%), an increase in the time to schedule surgery (84.5%), a detriment to residency training (63.1%), and no improvement in patient safety (60%.) Discussion Multiple-room surgery is common among responding otolaryngologists. Most respondents consider the practice to serve a role in facilitating access, efficiency, and training. Implications for Practice Due to recent attention placed on multiple-room surgery, institutions are reviewing policies regarding the practice. This survey suggests that policy changes that restrict multiple-room surgery must consider a potential unintended negative impact on patient care and access.

  12. Supplemental treatment of air in airborne infection isolation rooms using high-throughput in-room air decontamination units.

    PubMed

    Bergeron, Vance; Chalfine, Annie; Misset, Benoît; Moules, Vincent; Laudinet, Nicolas; Carlet, Jean; Lina, Bruno

    2011-05-01

    Evidence has recently emerged indicating that in addition to large airborne droplets, fine aerosol particles can be an important mode of influenza transmission that may have been hitherto underestimated. Furthermore, recent performance studies evaluating airborne infection isolation (AII) rooms designed to house infectious patients have revealed major discrepancies between what is prescribed and what is actually measured. We conducted an experimental study to investigate the use of high-throughput in-room air decontamination units for supplemental protection against airborne contamination in areas that host infectious patients. The study included both intrinsic performance tests of the air-decontamination unit against biological aerosols of particular epidemiologic interest and field tests in a hospital AII room under different ventilation scenarios. The unit tested efficiently eradicated airborne H5N2 influenza and Mycobacterium bovis (a 4- to 5-log single-pass reduction) and, when implemented with a room extractor, reduced the peak contamination levels by a factor of 5, with decontamination rates at least 33% faster than those achieved with the extractor alone. High-throughput in-room air treatment units can provide supplemental control of airborne pathogen levels in patient isolation rooms. Copyright © 2011 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Mosby, Inc. All rights reserved.

  13. Designing an Easy-to-use Executive Conference Room Control System

    NASA Astrophysics Data System (ADS)

    Back, Maribeth; Golovchinsky, Gene; Qvarfordt, Pernilla; van Melle, William; Boreczky, John; Dunnigan, Tony; Carter, Scott

    The Usable Smart Environment project (USE) aims at designing easy-to-use, highly functional, next-generation conference rooms. Our first design prototype focuses on creating a “no wizards” room for an American executive; that is, a room the executive could walk into and use by himself, without help from a technologist. A key idea in the USE framework is that customization is one of the best ways to create a smooth user experience. As the system needs to fit both with the personal leadership style of the executive and the corporation’s meeting culture, we began the design process by exploring the work flow in and around meetings attended by the executive.

  14. NASA researchers in gold control room during an F-15 HiDEC flight

    NASA Technical Reports Server (NTRS)

    1993-01-01

    NASA researchers monitor equipment in the mission control Gold room at the Dryden Flight Research Center, Edwards, California, during a flight of an F-15 Highly Integrated Digital Electronic Control (HIDEC) research aircraft. The system was developed on the F-15 to investigate and demonstrate methods of obtaining optimum aircraft performance. The major elements of HIDEC were a Digital Electronic Flight Control System (DEFCS), a Digital Electronic Engine Control (DEEC), an on-board general purpose computer, and an integrated architecture to allow all components to 'talk to each other.' Unlike standard F-15s, which have a mechanical and analog electronic flight control system, the HIDEC F-15 also had a dual-channel, fail-safe digital flight control system programmed in Pascal. It was linked to the Military Standard 1553B and a H009 data bus which tied all the other electronic systems together.

  15. Mission Operations Control Room Activities during STS-2 mission

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Mission Operations Control Room (MOCR) activities during STS-2 mission. President Ronald Reagan is briefed by Dr. Christopher C. Kraft, Jr., JSC Director, who points toward the orbiter spotter on the projection plotter at the front of the MOCR (39499); President Reagan joking with STS-2 astronauts during space to ground conversation (39500); Mission Specialist/Astronaut Sally K. Ride communicates with the STS-2 crew from the spacecraft communicator console (39501); Charles R. Lewis, bronze team Flight Director, monitors activity from the STS-2 crew. He is seated at the flight director console in MOCR (39502); Eugene F. Kranz, Deputy Director of Flight Operations at JSC answers a question during a press conference on Nov. 13, 1981. He is flanked by Glynn S. Lunney, Manager, Space Shuttle Program Office, JSC; and Dr. Christopher C. Kraft, Jr., Director of JSC (39503).

  16. 10 CFR 1703.103 - Requests for board records available through the public reading room.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Requests for board records available through the public reading room. 1703.103 Section 1703.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.103 Requests for board records available through the public reading room. (a) A...

  17. 10 CFR 1703.103 - Requests for board records available through the public reading room.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Requests for board records available through the public reading room. 1703.103 Section 1703.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.103 Requests for board records available through the public reading room. (a) A...

  18. 10 CFR 1703.103 - Requests for board records available through the public reading room.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Requests for board records available through the public reading room. 1703.103 Section 1703.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.103 Requests for board records available through the public reading room. (a) A...

  19. 10 CFR 1703.103 - Requests for board records available through the public reading room.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Requests for board records available through the public reading room. 1703.103 Section 1703.103 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD PUBLIC INFORMATION AND REQUESTS § 1703.103 Requests for board records available through the public reading room. (a) A...

  20. The Lawrence D. Dorr Surgical Techniques & Technologies Award: "Running Two Rooms" Does Not Compromise Outcomes or Patient Safety in Joint Arthroplasty.

    PubMed

    Hamilton, William G; Ho, Henry; Parks, Nancy L; Strait, Alexander V; Hopper, Robert H; McDonald, James F; Goyal, Nitin; Fricka, Kevin B; Engh, C Anderson

    2018-07-01

    Scrutiny from the federal government and the media regarding the safety of 1 surgeon doing cases in 2 operating rooms (ORs) on the same day, prompted us to examine our own institutional data. Over the past 11 years, surgeons at our facility have operated consecutively in 1 OR on a given day or used 2 alternating ORs. This study compares these cases with a focus on revisions and complications in both groups. Six surgeons performed a total of 16,916 primary hip and knee arthroplasties from 2006-2016. 7002 cases (41%) were consecutive cases (CCs) and 9914 cases (59%) were overlapping cases (OCs). Intraoperative complications, component revisions, and postoperative complications within 90 days of surgery were compared between the CC and OC groups. There was no difference in intraoperative complication rates between the two groups (CC 1.6% vs. OC 1.7%, relative risk 1.082, 95% confidence interval 0.852 to 1.375, P = .52). There was no difference in 90-day component revision rates among the CC and OC groups (0.66% vs. 0.85% respectively, relative risk = 1.290, 95% confidence interval 0.901 to 1.845, P = .19). There was also no difference in 90-day complication rates among the CC and OC groups (1.33% vs. 1.45% respectively, relative risk = 1.094, 95% confidence interval 0.844 to 1.417, P = .54). This large study of a single institution with multiple surgeons over an 11-year period shows no compromise in patient safety or outcomes when comparing cases done in either consecutive or overlapping rooms. Copyright © 2018 Elsevier Inc. All rights reserved.

  1. Operating room integration and telehealth.

    PubMed

    Bucholz, Richard D; Laycock, Keith A; McDurmont, Leslie

    2011-01-01

    The increasing use of advanced automated and computer-controlled systems and devices in surgical procedures has resulted in problems arising from the crowding of the operating room with equipment and the incompatible control and communication standards associated with each system. This lack of compatibility between systems and centralized control means that the surgeon is frequently required to interact with multiple computer interfaces in order to obtain updates and exert control over the various devices at his disposal. To reduce this complexity and provide the surgeon with more complete and precise control of the operating room systems, a unified interface and communication network has been developed. In addition to improving efficiency, this network also allows the surgeon to grant remote access to consultants and observers at other institutions, enabling experts to participate in the procedure without having to travel to the site.

  2. Safety Metrics for Human-Computer Controlled Systems

    NASA Technical Reports Server (NTRS)

    Leveson, Nancy G; Hatanaka, Iwao

    2000-01-01

    The rapid growth of computer technology and innovation has played a significant role in the rise of computer automation of human tasks in modem production systems across all industries. Although the rationale for automation has been to eliminate "human error" or to relieve humans from manual repetitive tasks, various computer-related hazards and accidents have emerged as a direct result of increased system complexity attributed to computer automation. The risk assessment techniques utilized for electromechanical systems are not suitable for today's software-intensive systems or complex human-computer controlled systems.This thesis will propose a new systemic model-based framework for analyzing risk in safety-critical systems where both computers and humans are controlling safety-critical functions. A new systems accident model will be developed based upon modem systems theory and human cognitive processes to better characterize system accidents, the role of human operators, and the influence of software in its direct control of significant system functions Better risk assessments will then be achievable through the application of this new framework to complex human-computer controlled systems.

  3. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Tests and Inspections of Fired Thermal Fluid Heaters § 61.30-20 Automatic control and safety tests. Operational tests and check...

  4. 10 CFR 1703.105 - Requests for board records not available through the public reading room (FOIA requests).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... public reading room (FOIA requests). 1703.105 Section 1703.105 Energy DEFENSE NUCLEAR FACILITIES SAFETY... address for such requests is: Designated FOIA Officer, Defense Nuclear Facilities Safety Board, 625... pertain to an immediate source of risk to the public health and safety or worker safety at a defense...

  5. 10 CFR 1703.105 - Requests for board records not available through the public reading room (FOIA requests).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... public reading room (FOIA requests). 1703.105 Section 1703.105 Energy DEFENSE NUCLEAR FACILITIES SAFETY... address for such requests is: Designated FOIA Officer, Defense Nuclear Facilities Safety Board, 625... pertain to an immediate source of risk to the public health and safety or worker safety at a defense...

  6. 10 CFR 1703.105 - Requests for board records not available through the public reading room (FOIA requests).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... public reading room (FOIA requests). 1703.105 Section 1703.105 Energy DEFENSE NUCLEAR FACILITIES SAFETY... address for such requests is: Designated FOIA Officer, Defense Nuclear Facilities Safety Board, 625... pertain to an immediate source of risk to the public health and safety or worker safety at a defense...

  7. 10 CFR 1703.105 - Requests for board records not available through the public reading room (FOIA requests).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... public reading room (FOIA requests). 1703.105 Section 1703.105 Energy DEFENSE NUCLEAR FACILITIES SAFETY... address for such requests is: Designated FOIA Officer, Defense Nuclear Facilities Safety Board, 625... pertain to an immediate source of risk to the public health and safety or worker safety at a defense...

  8. 10 CFR 1703.105 - Requests for board records not available through the public reading room (FOIA requests).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... public reading room (FOIA requests). 1703.105 Section 1703.105 Energy DEFENSE NUCLEAR FACILITIES SAFETY... address for such requests is: Designated FOIA Officer, Defense Nuclear Facilities Safety Board, 625... pertain to an immediate source of risk to the public health and safety or worker safety at a defense...

  9. Operators in the Plum Brook Reactor Facility Control Room

    NASA Image and Video Library

    1970-03-21

    Donald Rhodes, left, and Clyde Greer, right, monitor the operation of the National Aeronautics and Space Administration’s (NASA) Plum Brook Reactor Facility from the control room. The 60-megawatt test reactor, NASA’s only reactor, was the eighth largest test reactor in the world. The facility was built by the Lewis Research Center in the late 1950s to study the effects of radiation on different materials that could be used to construct nuclear propulsion systems for aircraft or rockets. The reactor went critical for the first time in 1961. For the next two years, two operators were on duty 24 hours per day working on the fission process until the reactor reached its full-power level in 1963. Reactor Operators were responsible for monitoring and controlling the reactor systems. Once the reactor was running under normal operating conditions, the work was relatively uneventful. Normally the reactor was kept at a designated power level within certain limits. Occasionally the operators had to increase the power for a certain test. The shift supervisor and several different people would get together and discuss the change before boosting the power. All operators were required to maintain a Reactor Operator License from the Atomic Energy Commission. The license included six months of training, an eight-hour written exam, a four-hour walkaround, and testing on the reactor controls.

  10. Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial.

    PubMed

    Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh

    2015-05-01

    One of the strategies for a good outcome and pain free childbearing is to design the delivery room. The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants' intervention vs. 66% of control participants had perinea laceration (P = 0.041). According to the findings of the present study, distracting senses in snoezelen room decreases mother's pain intensity, the length of labor, and incidence of episiotomy.

  11. Operating Room Time Savings with the Use of Splint Packs: A Randomized Controlled Trial

    PubMed Central

    Gonzalez, Tyler A.; Bluman, Eric M.; Palms, David; Smith, Jeremy T.; Chiodo, Christopher P.

    2016-01-01

    Background: The most expensive variable in the operating room (OR) is time. Lean Process Management is being used in the medical field to improve efficiency in the OR. Streamlining individual processes within the OR is crucial to a comprehensive time saving and cost-cutting health care strategy. At our institution, one hour of OR time costs approximately $500, exclusive of supply and personnel costs. Commercially prepared splint packs (SP) contain all components necessary for plaster-of-Paris short-leg splint application and have the potential to decrease splint application time and overall costs by making it a more lean process. We conducted a randomized controlled trial comparing OR time savings between SP use and bulk supply (BS) splint application. Methods: Fifty consecutive adult operative patients on whom post-operative short-leg splint immobilization was indicated were randomized to either a control group using BS or an experimental group using SP. One orthopaedic surgeon (EMB) prepared and applied all of the splints in a standardized fashion. Retrieval time, preparation time, splint application time, and total splinting time for both groups were measured and statistically analyzed. Results: The retrieval time, preparation time and total splinting time were significantly less (p<0.001) in the SP group compared with the BS group. There was no significant difference in application time between the SP group and BS group. Conclusion: The use of SP made the process of splinting more lean. This has resulted in an average of 2 minutes 52 seconds saved in total splinting time compared to BS, making it an effective cost-cutting and time saving technique. For high volume ORs, use of splint packs may contribute to substantial time and cost savings without impacting patient safety. PMID:26894212

  12. DHM simulation in virtual environments: a case-study on control room design.

    PubMed

    Zamberlan, M; Santos, V; Streit, P; Oliveira, J; Cury, R; Negri, T; Pastura, F; Guimarães, C; Cid, G

    2012-01-01

    This paper will present the workflow developed for the application of serious games in the design of complex cooperative work settings. The project was based on ergonomic studies and development of a control room among participative design process. Our main concerns were the 3D human virtual representation acquired from 3D scanning, human interaction, workspace layout and equipment designed considering ergonomics standards. Using Unity3D platform to design the virtual environment, the virtual human model can be controlled by users on dynamic scenario in order to evaluate the new work settings and simulate work activities. The results obtained showed that this virtual technology can drastically change the design process by improving the level of interaction between final users and, managers and human factors team.

  13. [Management for the operating room].

    PubMed

    Tschudi, O; Schüpfer, G

    2015-03-01

    Business companies, which in the current times also includes hospitals, must create customer benefits and as a prerequisite for this must sustainably generate profits. Management in the world of business means the formation and directing of a company or parts of a company on a permanent basis, whereby management in this context is not exercising power but function. This concept of management is exemplary developed in this article for the important services sector of the operating room (OR) and individual functions, such as resource control, capacity planning and materials administration are presented in detail. Some OR-specific management challenges are worked out. From this it becomes clear that the economic logic of the most efficient implementation possible is not a contradiction of medical ethics, enabling the most effective treatment possible for patients while safeguarding the highest possible levels of safety and quality. The article aims to build a bridge for medical specialists to the language and world of commerce, emphasizing the profession-based competence and hopefully to arouse interest to go into more detail.

  14. Crew resource management: using aviation techniques to improve operating room safety.

    PubMed

    Ricci, Michael A; Brumsted, John R

    2012-04-01

    Since the publication of the Institute of Medicine report estimating nearly 100,000 deaths per year from medical errors, hospitals and physicians have a renewed focus upon error reduction. We implemented a surgical crew resource management (CRM) program for all operating room (OR) personnel. In our academic medical center, 19,000 procedures per year are performed in 27 operating rooms. Mandatory CRM training was implemented for all peri-operative personnel. Aviation techniques introduced included a pre-operative checklist and brief, post-operative debrief, read and initial files, and various other aviation-based techniques. Compliance with conduct of the brief/debrief was monitored as well as wrong-site surgeries and retained foreign body events. The malpractice insurance database for claims was also queried for the period prior to and after training. Initial training was accomplished for 517 people, including all anesthesiologists, surgeons, nurses, technicians, and OR assistants. Pre-operative briefing increased from 6.7 to 99% within 4 mo. Wrong site surgeries and retained foreign bodies decreased from a high of seven in 2007 to none in 2008, but, after 14 mo without additional training, these rose to five in 2009. Malpractice expenses (payouts and legal fees) totaled $793,000 (2003-2007), but have been zero since 2008. CRM training and implementation had an impact on reducing the incidence of wrong site surgery and retained foreign bodies in our operating rooms. However, constant reinforcement and refresher training is necessary for sustained results. Though no one technique can prevent all errors, CRM can effect culture change, producing a safer environment.

  15. The role of 'no-touch' automated room disinfection systems in infection prevention and control.

    PubMed

    Otter, J A; Yezli, S; Perl, T M; Barbut, F; French, G L

    2013-01-01

    Surface contamination in hospitals is involved in the transmission of pathogens in a proportion of healthcare-associated infections. Admission to a room previously occupied by a patient colonized or infected with certain nosocomial pathogens increases the risk of acquisition by subsequent occupants; thus, there is a need to improve terminal disinfection of these patient rooms. Conventional disinfection methods may be limited by reliance on the operator to ensure appropriate selection, formulation, distribution and contact time of the agent. These problems can be reduced by the use of 'no-touch' automated room disinfection (NTD) systems. To summarize published data related to NTD systems. Pubmed searches for relevant articles. A number of NTD systems have emerged, which remove or reduce reliance on the operator to ensure distribution, contact time and process repeatability, and aim to improve the level of disinfection and thus mitigate the increased risk from the prior room occupant. Available NTD systems include hydrogen peroxide (H(2)O(2)) vapour systems, aerosolized hydrogen peroxide (aHP) and ultraviolet radiation. These systems have important differences in their active agent, delivery mechanism, efficacy, process time and ease of use. Typically, there is a trade-off between time and effectiveness among NTD systems. The choice of NTD system should be influenced by the intended application, the evidence base for effectiveness, practicalities of implementation and cost constraints. NTD systems are gaining acceptance as a useful tool for infection prevention and control. Copyright © 2012 The Healthcare Infection Society. Published by Elsevier Ltd. All rights reserved.

  16. Report for Task 8.4: Development of Control Room Layout Recommendations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, Robert

    Idaho National Laboratory (INL) has contracted Institutt for Energiteknikk (IFE) to support in the development of an end state vision for the US Nuclear industry and in particular for a utility that is currently moving forward with a control room modernization project. This support includes the development of an Overview display and technical support in conducting an operational study. Development of operational scenarios to be conducted using a full scope simulator at the INL HSSL. Additionally IFE will use the CREATE modelling tool to provide 3-D views of the potential and possible end state view after the completion of digitalmore » upgrade project.« less

  17. Safety control circuit for a neutronic reactor

    DOEpatents

    Ellsworth, Howard C.

    2004-04-27

    A neutronic reactor comprising an active portion containing material fissionable by neutrons of thermal energy, means to control a neutronic chain reaction within the reactor comprising a safety device and a regulating device, a safety device including means defining a vertical channel extending into the reactor from an aperture in the upper surface of the reactor, a rod containing neutron-absorbing materials slidably disposed within the channel, means for maintaining the safety rod in a withdrawn position relative to the active portion of the reactor including means for releasing said rod on actuation thereof, a hopper mounted above the active portion of the reactor having a door disposed at the bottom of the hopper opening into the vertical channel, a plurality of bodies of neutron-absorbing materials disposed within the hopper, and means responsive to the failure of the safety rod on actuation thereof to enter the active portion of the reactor for opening the door in the hopper.

  18. Evaluation of exposures to fluorocarbon 113 in a horizontal and a vertical laminar airflow clean room.

    PubMed

    Bloom, T F; Egeland, G M

    1999-01-01

    Exposures to 1,1,2-trichloro-1,2,2-trifluoroethane or fluorocarbon (FC) 113 were evaluated in a horizontal laminar airflow (HLAF) clean room and a vertical laminar airflow (VLAF) clean room. A full period consecutive samples measurement strategy was employed. Data were used to calculate 8-hour time-weighted averages (8-TWA) for major work groups and to characterize exposures associated with specific cleaning tasks. The MIRAN 1B infrared analyzer was used to estimate peak concentrations. In the HLAF clean room, 8-TWAs ranged from 193 to 439 ppm; in the VLAF clean room, 8-TWAs ranged from 110 to 935 ppm. These levels were below the current Occupational Safety and Health Administration permissible exposure limit and the National Institute for Occupational Safety and Health (NIOSH) recommended exposure limit for FC 113 of 1000 ppm. Short-term sample concentrations ranged from 104 ppm (inspection) to 1080 ppm (assembly) in the HLAF clean room and 51 ppm (packaging)-3380 ppm (flushing) in the VLAF clean room. In the VLAF clean room, several short-term concentrations measured during the flushing task--1421 ppm and 2522 ppm--were above the NIOSH short-term exposure limit (STEL) of 1250 ppm. These data suggest the possibility that the STEL may be exceeded for tasks involving direct work with liquid FC 113. Peak exposure levels may be reduced by modification of worker position in the HLAF clean room and by use of open wire tables in the VLAF clean room.

  19. User evaluation of an innovative digital reading room.

    PubMed

    Hugine, Akilah; Guerlain, Stephanie; Hedge, Alan

    2012-06-01

    Reading room design can have a major impact on radiologists' health, productivity, and accuracy in reading. Several factors must be taken into account in order to optimize the work environment for radiologists. Further, with the advancement in imaging technology, clinicians now have the ability to view and see digital exams without having to interact with radiologists. However, it is important to design components that encourage and enhance interactions between clinicians and radiologists to increase patient safety, and to combine physician and radiologist expertise. The present study evaluates alternative workstations in a real-world testbed space, using qualitative data (users' perspectives) to measure satisfaction with the lighting, ergonomics, furniture, collaborative spaces, and radiologist workstations. In addition, we consider the impact of the added collaboration components of the future reading room design, by utilizing user evaluation surveys to devise baseline satisfaction data regarding the innovative reading room environment.

  20. Physical design correlates of efficiency and safety in emergency departments: a qualitative examination.

    PubMed

    Pati, Debajyoti; Harvey, Thomas E; Pati, Sipra

    2014-01-01

    The objective of this study was to explore and identify physical design correlates of safety and efficiency in emergency department (ED) operations. This study adopted an exploratory, multimeasure approach to (1) examine the interactions between ED operations and physical design at 4 sites and (2) identify domains of physical design decision-making that potentially influence efficiency and safety. Multidisciplinary gaming and semistructured interviews were conducted with stakeholders at each site. Study data suggest that 16 domains of physical design decisions influence safety, efficiency, or both. These include (1) entrance and patient waiting, (2) traffic management, (3) subwaiting or internal waiting areas, (4) triage, (5) examination/treatment area configuration, (6) examination/treatment area centralization versus decentralization, (7) examination/treatment room standardization, (8) adequate space, (9) nurse work space, (10) physician work space, (11) adjacencies and access, (12) equipment room, (13) psych room, (14) staff de-stressing room, (15) hallway width, and (16) results waiting area. Safety and efficiency from a physical environment perspective in ED design are mutually reinforcing concepts--enhancing efficiency bears positive implications for safety. Furthermore, safety and security emerged as correlated concepts, with security issues bearing implications for safety, thereby suggesting important associations between safety, security, and efficiency.

  1. Photographic art in exam rooms may reduce white coat hypertension.

    PubMed

    Harper, Michael B; Kanayama-Trivedi, Stacy; Caldito, Gloria; Montgomery, David; Mayeaux, E J; DelRosso, Lourdes M

    2015-12-01

    Blood pressure (BP) elevation in medical office settings in patients who are normotensive in nonmedical settings is an effect known as 'white coat hypertension'. This phenomenon is thought to be due to situational anxiety caused by the experience of visiting a doctor and the anxiety-inducing nature of the medical office. Our study was designed to determine if carefully selected photographic art could counter the anxiety that causes white coat hypertension and lead to lower BP recordings in some patients. 117 adults, non-pregnant patients from the Louisiana State University Health Sciences Center Family Medicine Resident Clinic participated in this study. After the triage nurse measured the BP, the patients were randomly placed in either an exam room with standard medical posters (control room) or in an exam room with photographic art (photo room). The BP was measured in the exam room. After the medical visit, the patients switched rooms and the BP was measured a third time. The patients were asked to fill out a questionnaire to identify room preference. On average, the BP obtained in the control rooms was higher than that obtained in the photo rooms. There was a statistically significant difference between the mean arterial pressure, systolic BP and diastolic BP between the control room and the photo room. Landscape photographic art may have the beneficial effect of reducing BP in medical office examination rooms. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  2. First installation of a dual-room IVR-CT system in the emergency room.

    PubMed

    Wada, Daiki; Nakamori, Yasushi; Kanayama, Shuji; Maruyama, Shuhei; Kawada, Masahiro; Iwamura, Hiromu; Hayakawa, Koichi; Saito, Fukuki; Kuwagata, Yasuyuki

    2018-03-05

    Computed tomography (CT) embedded in the emergency room has gained importance in the early diagnostic phase of trauma care. In 2011, we implemented a new trauma workflow concept with a sliding CT scanner system with interventional radiology features (IVR-CT) that allows CT examination and emergency therapeutic intervention without relocating the patient, which we call the Hybrid emergency room (Hybrid ER). In the Hybrid ER, all life-saving procedures, CT examination, damage control surgery, and transcatheter arterial embolisation can be performed on the same table. Although the trauma workflow realized in the Hybrid ER may improve mortality in severe trauma, the Hybrid ER can potentially affect the efficacy of other in/outpatient diagnostic workflow because one room is occupied by one severely injured patient undergoing both emergency trauma care and CT scanning for long periods. In July 2017, we implemented a new trauma workflow concept with a dual-room sliding CT scanner system with interventional radiology features (dual-room IVR-CT) to increase patient throughput. When we perform emergency surgery or interventional radiology for a severely injured or ill patient in the Hybrid ER, the sliding CT scanner moves to the adjacent CT suite, and we can perform CT scanning of another in/outpatient. We believe that dual-room IVR-CT can contribute to the improvement of both the survival of severely injured or ill patients and patient throughput.

  3. Interior of display area (room 101), looking south towards TV ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior of display area (room 101), looking south towards TV control panel room (room 139) at far left corner. The stairway leads to the commander's quarters and the senior battle viewing bridge at top right. Control and communication consoles at the right - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  4. West wall, display area (room 101), view 1 of 4: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    West wall, display area (room 101), view 1 of 4: southwest corner, showing stairs to commander's quarters and viewing bridge, windows to controller's room (room 102), south end of control consoles, and holes in pedestal floor for computer equipment cables (tape drive I/O?) - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA

  5. How Past Loss of Control Accidents May Inform Safety Cases for Advanced Control Systems on Commercial Aircraft

    NASA Technical Reports Server (NTRS)

    Holloway, C. M.; Johnson, C. W.

    2008-01-01

    This paper describes five loss of control accidents involving commercial aircraft, and derives from those accidents three principles to consider when developing a potential safety case for an advanced flight control system for commercial aircraft. One, among the foundational evidence needed to support a safety case is the availability to the control system of accurate and timely information about the status and health of relevant systems and components. Two, an essential argument to be sustained in the safety case is that pilots are provided with adequate information about the control system to enable them to understand the capabilities that it provides. Three, another essential argument is that the advanced control system will not perform less safely than a good pilot.

  6. 77 FR 58567 - Information Collection Activities: Well Control and Production Safety Training, Submitted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-21

    ...-0006; OMB Number 1014-0008] Information Collection Activities: Well Control and Production Safety... requirements in the regulations under Subpart O, ``Well Control and Production Safety Training.'' This notice... and Production Safety Training. OMB Control Number: 1014-0008. Abstract: The Outer Continental Shelf...

  7. Who is in control of road safety? A STAMP control structure analysis of the road transport system in Queensland, Australia.

    PubMed

    Salmon, Paul M; Read, Gemma J M; Stevens, Nicholas J

    2016-11-01

    Despite significant progress, road trauma continues to represent a global safety issue. In Queensland (Qld), Australia, there is currently a focus on preventing the 'fatal five' behaviours underpinning road trauma (drug and drink driving, distraction, seat belt wearing, speeding, and fatigue), along with an emphasis on a shared responsibility for road safety that spans road users, vehicle manufacturers, designers, policy makers etc. The aim of this article is to clarify who shares the responsibility for road safety in Qld and to determine what control measures are enacted to prevent the fatal five behaviours. This is achieved through the presentation of a control structure model that depicts the actors and organisations within the Qld road transport system along with the control and feedback relationships that exist between them. Validated through a Delphi study, the model shows a diverse set of actors and organisations who share the responsibility for road safety that goes beyond those discussed in road safety policies and strategies. The analysis also shows that, compared to other safety critical domains, there are less formal control structures in road transport and that opportunities exist to add new controls and strengthen existing ones. Relationships that influence rather than control are also prominent. Finally, when compared to other safety critical domains, the strength of road safety controls is brought into question. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Snoezelen Room and Childbirth Outcome: A Randomized Clinical Trial

    PubMed Central

    Jamshidi Manesh, Mansoureh; Kalati, Mahnaz; Hosseini, Fatemeh

    2015-01-01

    Background: One of the strategies for a good outcome and pain free childbearing is to design the delivery room. Objectives: The aim of this study was to evaluate the effects of snoezelen room on childbearing outcome such as pain intensity, duration of labor, and perinea status in nulliparous women. Patients and Methods: This study was a randomized controlled clinical trial consists of 100 childbearing women. They were randomly divided into 2 groups. The experimental group went to snoezelen room when their cervix dilation was 4 cm, while the control group went to physiologic delivery room with the same cervix dilation. Results: The mean ± SD of VAS (Visual Analogue Scale) pain intensity of the experimental and control groups before the intervention were 5.1 ± 1.95 and 5.58 ± 1.62, respectively (P = 0.13). The mean ± SD of VAS pain intensity scores of the experimental and control groups after 3 hours spending in their assigned rooms were 5.26 ± 0.86 and 9.56 ± 1.48, respectively (P = 0.01). The mean ± SD of the first stage scores of the experimental and control groups were 6.95 ± 0.97 and 8.41 ± 0.67, respectively (P = 0.042). About 92% of participants’ intervention vs. 66% of control participants had perinea laceration (P = 0.041). Conclusions: According to the findings of the present study, distracting senses in snoezelen room decreases mother’s pain intensity, the length of labor, and incidence of episiotomy. PMID:26082849

  9. Safety margins in older adults increase with improved control of a dynamic object

    PubMed Central

    Hasson, Christopher J.; Sternad, Dagmar

    2014-01-01

    Older adults face decreasing motor capabilities due to pervasive neuromuscular degradations. As a consequence, errors in movement control increase. Thus, older individuals should maintain larger safety margins than younger adults. While this has been shown for object manipulation tasks, several reports on whole-body activities, such as posture and locomotion, demonstrate age-related reductions in safety margins. This is despite increased costs for control errors, such as a fall. We posit that this paradox could be explained by the dynamic challenge presented by the body or also an external object, and that age-related reductions in safety margins are in part due to a decreased ability to control dynamics. To test this conjecture we used a virtual ball-in-cup task that had challenging dynamics, yet afforded an explicit rendering of the physics and safety margin. The hypotheses were: (1) When manipulating an object with challenging dynamics, older adults have smaller safety margins than younger adults. (2) Older adults increase their safety margins with practice. Nine young and 10 healthy older adults practiced moving the virtual ball-in-cup to a target location in exactly 2 s. The accuracy and precision of the timing error quantified skill, and the ball energy relative to an escape threshold quantified the safety margin. Compared to the young adults, older adults had increased timing errors, greater variability, and decreased safety margins. With practice, both young and older adults improved their ability to control the object with decreased timing errors and variability, and increased their safety margins. These results suggest that safety margins are related to the ability to control dynamics, and may explain why in tasks with simple dynamics older adults use adequate safety margins, but in more complex tasks, safety margins may be inadequate. Further, the results indicate that task-specific training may improve safety margins in older adults. PMID:25071566

  10. Institutional Tuberculosis Transmission. Controlled Trial of Upper Room Ultraviolet Air Disinfection: A Basis for New Dosing Guidelines.

    PubMed

    Mphaphlele, Matsie; Dharmadhikari, Ashwin S; Jensen, Paul A; Rudnick, Stephen N; van Reenen, Tobias H; Pagano, Marcello A; Leuschner, Wilhelm; Sears, Tim A; Milonova, Sonya P; van der Walt, Martie; Stoltz, Anton C; Weyer, Karin; Nardell, Edward A

    2015-08-15

    Transmission is driving the global tuberculosis epidemic, especially in congregate settings. Worldwide, natural ventilation is the most common means of air disinfection, but it is inherently unreliable and of limited use in cold climates. Upper room germicidal ultraviolet (UV) air disinfection with air mixing has been shown to be highly effective, but improved evidence-based dosing guidelines are needed. To test the efficacy of upper room germicidal air disinfection with air mixing to reduce tuberculosis transmission under real hospital conditions, and to define the application parameters responsible as a basis for proposed new dosing guidelines. Over an exposure period of 7 months, 90 guinea pigs breathed only untreated exhaust ward air, and another 90 guinea pigs breathed only air from the same six-bed tuberculosis ward on alternate days when upper room germicidal air disinfection was turned on throughout the ward. The tuberculin skin test conversion rates (>6 mm) of the two chambers were compared. The hazard ratio for guinea pigs in the control chamber converting their skin test to positive was 4.9 (95% confidence interval, 2.8-8.6), with an efficacy of approximately 80%. Upper room germicidal UV air disinfection with air mixing was highly effective in reducing tuberculosis transmission under hospital conditions. These data support using either a total fixture output (rather than electrical or UV lamp wattage) of 15-20 mW/m(3) total room volume, or an average whole-room UV irradiance (fluence rate) of 5-7 μW/cm(2), calculated by a lighting computer-assisted design program modified for UV use.

  11. Watershed safety and quality control by safety threshold method

    NASA Astrophysics Data System (ADS)

    Da-Wei Tsai, David; Mengjung Chou, Caroline; Ramaraj, Rameshprabu; Liu, Wen-Cheng; Honglay Chen, Paris

    2014-05-01

    Taiwan was warned as one of the most dangerous countries by IPCC and the World Bank. In such an exceptional and perilous island, we would like to launch the strategic research of land-use management on the catastrophe prevention and environmental protection. This study used the watershed management by "Safety Threshold Method" to restore and to prevent the disasters and pollution on island. For the deluge prevention, this study applied the restoration strategy to reduce total runoff which was equilibrium to 59.4% of the infiltration each year. For the sediment management, safety threshold management could reduce the sediment below the equilibrium of the natural sediment cycle. In the water quality issues, the best strategies exhibited the significant total load reductions of 10% in carbon (BOD5), 15% in nitrogen (nitrate) and 9% in phosphorus (TP). We found out the water quality could meet the BOD target by the 50% peak reduction with management. All the simulations demonstrated the safety threshold method was helpful to control the loadings within the safe range of disasters and environmental quality. Moreover, from the historical data of whole island, the past deforestation policy and the mistake economic projects were the prime culprits. Consequently, this study showed a practical method to manage both the disasters and pollution in a watershed scale by the land-use management.

  12. Designing Crane Controls with Applied Mechanical and Electrical Safety Features

    NASA Technical Reports Server (NTRS)

    Lytle, Bradford P.; Walczak, Thomas A.

    2002-01-01

    The use of overhead traveling bridge cranes in many varied applications is common practice. In particular, the use of cranes in the nuclear, military, commercial, aerospace, and other industries can involve safety critical situations. Considerations for Human Injury or Casualty, Loss of Assets, Endangering the Environment, or Economic Reduction must be addressed. Traditionally, in order to achieve additional safety in these applications, mechanical systems have been augmented with a variety of devices. These devices assure that a mechanical component failure shall reduce the risk of a catastrophic loss of the correct and/or safe load carrying capability. ASME NOG-1-1998, (Rules for Construction of Overhead and Gantry Cranes, Top Running Bridge, and Multiple Girder), provides design standards for cranes in safety critical areas. Over and above the minimum safety requirements of todays design standards, users struggle with obtaining a higher degree of reliability through more precise functional specifications while attempting to provide "smart" safety systems. Electrical control systems also may be equipped with protective devices similar to the mechanical design features. Demands for improvement of the cranes "control system" is often recognized, but difficult to quantify for this traditionally "mechanically" oriented market. Finite details for each operation must be examined and understood. As an example, load drift (or small motions) at close tolerances can be unacceptable (and considered critical). To meet these high functional demands encoders and other devices are independently added to control systems to provide motion and velocity feedback to the control drive. This paper will examine the implementation of Programmable Electronic Systems (PES). PES is a term this paper will use to describe any control system utilizing any programmable electronic device such as Programmable Logic Controllers (PLC), or an Adjustable Frequency Drive (AID) 'smart' programmable

  13. Radiation design and control features of a hospital room for a low dose rate remote afterloading unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasgow, G.P.; Corrigan, K.W.

    We have renovated, and used for four years, a small 3.4 m x 4.3 m conventional patient second floor hospital room to accommodate a low dose rate remote afterloading unit containing 13 GBq (0.35 Ci) of {sup 137}Cs. Supplemental room shielding consists of a power assisted door (536 kg, 1.7 cm thickness of lead), 1.3 cm lead wall shielding at selected wall locations and on a projector shield beneath the bed, and 0.6 cm of lead over the floor above. Radiation control features consisted of a room interior radiation detector independent of the remote afterloading unit, a redundant patient/nurse communicationmore » system, a remote control system, a door interlock system to insert and retract the radioactive pellets, and a visible and audible status indictator system located at a nearby nurses` work station. Renovation costs (in 1990 dollars) were $383 per square foot; total project costs were $187,000. Nursing personnel radiation exposure was reduced from about 6 {mu}Sv (mg Ra eq){sup -1} (0.6 mrem (mg Ra eq){sup -1}) to about 0.7 {mu}Sv (mg Ra eq){sup -1} (0.07 mrem (mg Ra eq){sup -1}), almost a tenfold reduction. 6 refs., 2 figs., 1 tab.« less

  14. 48 CFR 52.250-3 - SAFETY Act Block Designation/Certification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... QATTs have been deployed. It also confers other important benefits. SAFETY Act designation and SAFETY... or requests may be mailed to: Directorate of Science and Technology, SAFETY Act/Room 4320, Department...

  15. 48 CFR 52.250-3 - SAFETY Act Block Designation/Certification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... QATTs have been deployed. It also confers other important benefits. SAFETY Act designation and SAFETY... or requests may be mailed to: Directorate of Science and Technology, SAFETY Act/Room 4320, Department...

  16. 48 CFR 52.250-3 - SAFETY Act Block Designation/Certification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... QATTs have been deployed. It also confers other important benefits. SAFETY Act designation and SAFETY... or requests may be mailed to: Directorate of Science and Technology, SAFETY Act/Room 4320, Department...

  17. 48 CFR 52.250-3 - SAFETY Act Block Designation/Certification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... QATTs have been deployed. It also confers other important benefits. SAFETY Act designation and SAFETY... or requests may be mailed to: Directorate of Science and Technology, SAFETY Act/Room 4320, Department...

  18. 48 CFR 52.250-3 - SAFETY Act Block Designation/Certification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... QATTs have been deployed. It also confers other important benefits. SAFETY Act designation and SAFETY... or requests may be mailed to: Directorate of Science and Technology, SAFETY Act/Room 4320, Department...

  19. 30 CFR 75.1712-1 - Availability of surface bathing facilities; change rooms; and sanitary facilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...; change rooms; and sanitary facilities. 75.1712-1 Section 75.1712-1 Mineral Resources MINE SAFETY AND...-UNDERGROUND COAL MINES Miscellaneous § 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities. Except where a waiver has been granted pursuant to the provisions of § 75.1712-4, each...

  20. 30 CFR 75.1712-1 - Availability of surface bathing facilities; change rooms; and sanitary facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; change rooms; and sanitary facilities. 75.1712-1 Section 75.1712-1 Mineral Resources MINE SAFETY AND...-UNDERGROUND COAL MINES Miscellaneous § 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities. Except where a waiver has been granted pursuant to the provisions of § 75.1712-4, each...

  1. 30 CFR 75.1712-1 - Availability of surface bathing facilities; change rooms; and sanitary facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; change rooms; and sanitary facilities. 75.1712-1 Section 75.1712-1 Mineral Resources MINE SAFETY AND...-UNDERGROUND COAL MINES Miscellaneous § 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities. Except where a waiver has been granted pursuant to the provisions of § 75.1712-4, each...

  2. 30 CFR 75.1712-1 - Availability of surface bathing facilities; change rooms; and sanitary facilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...; change rooms; and sanitary facilities. 75.1712-1 Section 75.1712-1 Mineral Resources MINE SAFETY AND...-UNDERGROUND COAL MINES Miscellaneous § 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities. Except where a waiver has been granted pursuant to the provisions of § 75.1712-4, each...

  3. 30 CFR 75.1712-1 - Availability of surface bathing facilities; change rooms; and sanitary facilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; change rooms; and sanitary facilities. 75.1712-1 Section 75.1712-1 Mineral Resources MINE SAFETY AND...-UNDERGROUND COAL MINES Miscellaneous § 75.1712-1 Availability of surface bathing facilities; change rooms; and sanitary facilities. Except where a waiver has been granted pursuant to the provisions of § 75.1712-4, each...

  4. 33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA

  5. Room-Temperature Quantum Cloning Machine with Full Coherent Phase Control in Nanodiamond

    PubMed Central

    Chang, Yan-Chun; Liu, Gang-Qin; Liu, Dong-Qi; Fan, Heng; Pan, Xin-Yu

    2013-01-01

    In contrast to the classical world, an unknown quantum state cannot be cloned ideally, as stated by the no-cloning theorem. However, it is expected that approximate or probabilistic quantum cloning will be necessary for different applications, and thus various quantum cloning machines have been designed. Phase quantum cloning is of particular interest because it can be used to attack the Bennett-Brassard 1984 (BB84) states used in quantum key distribution for secure communications. Here, we report the first room-temperature implementation of quantum phase cloning with a controllable phase in a solid-state system: the nitrogen-vacancy centre of a nanodiamond. The phase cloner works well for all qubits located on the equator of the Bloch sphere. The phase is controlled and can be measured with high accuracy, and the experimental results are consistent with theoretical expectations. This experiment provides a basis for phase-controllable quantum information devices. PMID:23511233

  6. A HUMAN AUTOMATION INTERACTION CONCEPT FOR A SMALL MODULAR REACTOR CONTROL ROOM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya; Spielman, Zach; Hill, Rachael

    Many advanced nuclear power plant (NPP) designs incorporate higher degrees of automation than the existing fleet of NPPs. Automation is being introduced or proposed in NPPs through a wide variety of systems and technologies, such as advanced displays, computer-based procedures, advanced alarm systems, and computerized operator support systems. Additionally, many new reactor concepts, both full scale and small modular reactors, are proposing increased automation and reduced staffing as part of their concept of operations. However, research consistently finds that there is a fundamental tradeoff between system performance with increased automation and reduced human performance. There is a need to addressmore » the question of how to achieve high performance and efficiency of high levels of automation without degrading human performance. One example of a new NPP concept that will utilize greater degrees of automation is the SMR concept from NuScale Power. The NuScale Power design requires 12 modular units to be operated in one single control room, which leads to a need for higher degrees of automation in the control room. Idaho National Laboratory (INL) researchers and NuScale Power human factors and operations staff are working on a collaborative project to address the human performance challenges of increased automation and to determine the principles that lead to optimal performance in highly automated systems. This paper will describe this concept in detail and will describe an experimental test of the concept. The benefits and challenges of the approach will be discussed.« less

  7. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines.

    PubMed

    Zhou, Lu-Jie; Cao, Qing-Gui; Yu, Kai; Wang, Lin-Lin; Wang, Hai-Bin

    2018-04-26

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines.

  8. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines

    PubMed Central

    Zhou, Lu-jie; Cao, Qing-gui; Yu, Kai; Wang, Lin-lin; Wang, Hai-bin

    2018-01-01

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines. PMID:29701715

  9. Mission Operations Control Room Activities during STS-2 mission

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Mission Operations Control Room (MOCR) activities during STS-2 mission. President Ronald Reagan and Dr. Christopher C. Kraft, Jr., look toward the orbiter spotter on the projection plotter at the front of the MOCR. Also present are Astronaut Daniel C. Brandenstein, seated left, and NASA Administrator James M. Beggs standing left of center. In the foreground, Dr. Hans Mark, Deputy NASA Administrator, briefs Michael Deaver, Special Assistant to President Reagan (39504); President Reagan speaks to the STS-2 crew during the second day of their mission. On hand in MOCR were NASA Administrator James M. Beggs and Deputy Administrator Hans Mark (standing behind the president but mostly out of frame) and Dr. Kraft on the right. Eugene F. Kranz, Deputy Director of Flight Operations can be seen in the background seated at the Flight Operations Directorate (FOD) console. Also present is Astronaut Daniel C. Brandenstein, seated left, who turned the communications over to Mr. Reagan (39505).

  10. Controlling the selective formation of calcium sulfate polymorphs at room temperature.

    PubMed

    Tritschler, Ulrich; Van Driessche, Alexander E S; Kempter, Andreas; Kellermeier, Matthias; Cölfen, Helmut

    2015-03-23

    Calcium sulfate is a naturally abundant and technologically important mineral with a broad scope of applications. However, controlling CaSO4 polymorphism and, with it, its final material properties still represents a major challenge, and to date there is no universal method for the selective production of the different hydrated and anhydrous forms under mild conditions. Herein we report the first successful synthesis of pure anhydrite from solution at room temperature. We precipitated calcium sulfate in alcoholic media at low water contents. Moreover, by adjusting the amount of water in the syntheses, we can switch between the distinct polymorphs and fine-tune the outcome of the reaction, yielding either any desired CaSO4 phase in pure state or binary mixtures with predefined compositions. This concept provides full control over phase selection in CaSO4 mineralization and may allow for the targeted fabrication of corresponding materials for use in various areas. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  11. 14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING BLANK PANEL AND COMPLEX SAFETY OFFICER PANEL. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  12. 30 CFR 42.50 - Charges for room and board.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... board. The Academy will charge room and board to all persons staying at the Academy, except MSHA personnel, persons attending the Academy under a program supported through an MSHA State grant, and persons..., supervision, or management of a function or activity under the Federal Mine Safety and Health Act of 1977 or a...

  13. Control of Industrial Safety Based on Dynamic Characteristics of a Safety Budget-Industrial Accident Rate Model in Republic of Korea.

    PubMed

    Choi, Gi Heung; Loh, Byoung Gook

    2017-06-01

    Despite the recent efforts to prevent industrial accidents in the Republic of Korea, the industrial accident rate has not improved much. Industrial safety policies and safety management are also known to be inefficient. This study focused on dynamic characteristics of industrial safety systems and their effects on safety performance in the Republic of Korea. Such dynamic characteristics are particularly important for restructuring of the industrial safety system. The effects of damping and elastic characteristics of the industrial safety system model on safety performance were examined and feedback control performance was explained in view of cost and benefit. The implications on safety policies of restructuring the industrial safety system were also explored. A strong correlation between the safety budget and the industrial accident rate enabled modeling of an industrial safety system with these variables as the input and the output, respectively. A more effective and efficient industrial safety system could be realized by having weaker elastic characteristics and stronger damping characteristics in it. A substantial decrease in total social cost is expected as the industrial safety system is restructured accordingly. A simple feedback control with proportional-integral action is effective in prevention of industrial accidents. Securing a lower level of elastic industrial accident-driving energy appears to have dominant effects on the control performance compared with the damping effort to dissipate such energy. More attention needs to be directed towards physical and social feedbacks that have prolonged cumulative effects. Suggestions for further improvement of the safety system including physical and social feedbacks are also made.

  14. Systematic control of nonmetallic materials for improved fire safety

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The elements of a systematic fire safety program are summarized and consist of fire safety criteria, design considerations, testing of materials, development of nonmetallic materials, nonmetallic materials information systems, design reviews, and change control. The system described in this report was developed for the Apollo spacecraft. The system can, however, be tailored to many industrial, commercial, and military activities.

  15. Flexible Control of Safety Margins for Action Based on Environmental Variability.

    PubMed

    Hadjiosif, Alkis M; Smith, Maurice A

    2015-06-17

    To reduce the risk of slip, grip force (GF) control includes a safety margin above the force level ordinarily sufficient for the expected load force (LF) dynamics. The current view is that this safety margin is based on the expected LF dynamics, amounting to a static safety factor like that often used in engineering design. More efficient control could be achieved, however, if the motor system reduces the safety margin when LF variability is low and increases it when this variability is high. Here we show that this is indeed the case by demonstrating that the human motor system sizes the GF safety margin in proportion to an internal estimate of LF variability to maintain a fixed statistical confidence against slip. In contrast to current models of GF control that neglect the variability of LF dynamics, we demonstrate that GF is threefold more sensitive to the SD than the expected value of LF dynamics, in line with the maintenance of a 3-sigma confidence level. We then show that a computational model of GF control that includes a variability-driven safety margin predicts highly asymmetric GF adaptation between increases versus decreases in load. We find clear experimental evidence for this asymmetry and show that it explains previously reported differences in how rapidly GFs and manipulatory forces adapt. This model further predicts bizarre nonmonotonic shapes for GF learning curves, which are faithfully borne out in our experimental data. Our findings establish a new role for environmental variability in the control of action. Copyright © 2015 the authors 0270-6474/15/359106-16$15.00/0.

  16. WE-F-209-02: Radiation Safety Surveys of Linear Accelerators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, M.

    2016-06-15

    Over the past few years, numerous Accreditation Bodies, Regulatory Agencies, and State Regulations have implemented requirements for Radiation Safety Surveys following installation or modification to x-ray rooms. The objective of this session is to review best practices in performing radiation safety surveys for both Therapy and Diagnostic installations, as well as a review of appropriate survey instruments. This session will be appropriate for both therapy and imaging physicists who are looking to increase their working knowledge of radiation safety surveys. Learning Objectives: Identify Appropriate Survey Meters for Radiation Safety Surveys Develop best practices for Radiation Safety Surveys for Therapy unitsmore » that include common areas of concern. Develop best practices for Radiation Safety Surveys of Diagnostic and Nuclear Medicine rooms. Identify acceptable dose levels and the factors that affect the calculations associated with performing Radiation Safety Surveys.« less

  17. Ether-based nonflammable electrolyte for room temperature sodium battery

    NASA Astrophysics Data System (ADS)

    Feng, Jinkui; Zhang, Zhen; Li, Lifei; Yang, Jian; Xiong, Shenglin; Qian, Yitai

    2015-06-01

    Safety problem is one of the key points that hinder the development of room temperature sodium batteries. In this paper, four well-known nonflammable organic compounds, Trimethyl Phosphate (TMP), Tri(2,2,2-trifluoroethyl) phosphite (TFEP), Dimethyl Methylphosphonate (DMMP), Methyl nonafluorobuyl Ether (MFE), are investigated as nonflammable solvents in sodium batteries for the first time. Among them, MFE is stable towards sodium metal at room temperature. The electrochemical properties and electrode compatibility of MFE based electrolyte are investigated. Both Prussian blue cathode and carbon nanotube anode show good electrochemical performance retention in this electrolyte. The results suggest that MFE is a promising option as nonflammable electrolyte additive for sodium batteries.

  18. Characterization Report for the Demolition and Remodel of B151 Rooms 1318, 1322 and 1326

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sexton, Jenna L.; Won, Geoffrey

    2017-03-31

    In support of a remodel for rooms 1318, 1322, and 1326 in building 151, the Environmental Safety and Health (ES&H) team has worked to develop a detailed characterization of contaminants in each room. This report serves as a summary of the results for all radioactive material and Industrial Hygiene (IH) metals sampling performed of accessible areas.

  19. The Application of Software Safety to the Constellation Program Launch Control System

    NASA Technical Reports Server (NTRS)

    Kania, James; Hill, Janice

    2011-01-01

    The application of software safety practices on the LCS project resulted in the successful implementation of the NASA Software Safety Standard NASA-STD-8719.138 and CxP software safety requirements. The GOP-GEN-GSW-011 Hazard Report was the first report developed at KSC to identify software hazard causes and their controls. This approach can be applied to similar large software - intensive systems where loss of control can lead to a hazard.

  20. Clean room survey and assessment, volume 5, appendix H

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The scope of this task is to perform a comparative analysis of the various Environmental Control Life Support System (ECLSS) options for different growth scenarios. The Space Station Freedom ECLSS design and existing ground-based clean room facilities are used as a baseline for comparison. Specifically addressed here are the ground based clean room facilities at the Marshall Space Flight Center (MSFC). Given here is an evaluation of the facilities, equipment, technologies, and procedures used to maintain specified environments in typical aerospace industrial areas. Twenty-five specific clean rooms are evaluated. The objectives were to collect, compare, and catalog data for each specified facility in the areas of engineering and design, construction materials, work stations, contamination control, particulate elimination, entry systems, and instrumentation, and to make recommendations concerning enhancements required to assure an efficient and orderly evolution of MSFC clean room environmental control facilities.

  1. Robust isothermal electric control of exchange bias at room temperature

    NASA Astrophysics Data System (ADS)

    Binek, Christian

    2011-03-01

    Voltage-controlled spintronics is of particular importance to continue progress in information technology through reduced power consumption, enhanced processing speed, integration density, and functionality in comparison with present day CMOS electronics. Almost all existing and prototypical solid-state spintronic devices rely on tailored interface magnetism, enabling spin-selective transmission or scattering of electrons. Controlling magnetism at thin-film interfaces, preferably by purely electrical means, is a key challenge to better spintronics. Currently, most attempts to electrically control magnetism focus on potentially large magnetoelectric effects of multiferroics. We report on our interest in magnetoelectric Cr 2 O3 (chromia). Robust isothermal electric control of exchange bias is achieved at room temperature in perpendicular anisotropic Cr 2 O3 (0001)/CoPd exchange bias heterostructures. This discovery promises significant implications for potential spintronics. From the perspective of basic science, our finding serves as macroscopic evidence for roughness-insensitive and electrically controllable equilibrium boundary magnetization in magnetoelectric antiferromagnets. The latter evolves at chromia (0001) surfaces and interfaces when chromia is in one of its two degenerate antiferromagnetic single domain states selected via magnetoelectric annealing. Theoretical insight into the boundary magnetization and its role in electrically controlled exchange bias is gained from first-principles calculations and general symmetry arguments. Measurements of spin-resolved ultraviolet photoemission, magnetometry at Cr 2 O3 (0001) surfaces, and detailed investigations of the unique exchange bias properties of Cr 2 O3 (0001)/CoPd including its electric controllability provide macroscopically averaged information about the boundary magnetization of chromia. Laterally resolved X-ray PEEM and temperature dependent MFM reveal detailed microscopic information of the chromia

  2. [Comprehensive system integration and networking in operating rooms].

    PubMed

    Feußner, H; Ostler, D; Kohn, N; Vogel, T; Wilhelm, D; Koller, S; Kranzfelder, M

    2016-12-01

    A comprehensive surveillance and control system integrating all devices and functions is a precondition for realization of the operating room of the future. Multiple proprietary integrated operation room systems are currently available with a central user interface; however, they only cover a relatively small part of all functionalities. Internationally, there are at least three different initiatives to promote a comprehensive systems integration and networking in the operating room: the Japanese smart cyber operating theater (SCOT), the American medical device plug-and-play interoperability program (MDPnP) and the German secure and dynamic networking in operating room and hospital (OR.NET) project supported by the Federal Ministry of Education and Research. Within the framework of the internationally advanced OR.NET project, prototype solution approaches were realized, which make short-term and mid-term comprehensive data retrieval systems probable. An active and even autonomous control of the medical devices by the surveillance and control system (closed loop) is expected only in the long run due to strict regulatory barriers.

  3. Feasibility of Administering High-Dose 131I-MIBG Therapy to Children with High-Risk Neuroblastoma without Lead-Lined Rooms

    PubMed Central

    Chu, Bae P.; Horan, Christopher; Basu, Ellen; Dauer, Lawrence; Williamson, Matthew; Carrasquillo, Jorge A.; Pandit-Taskar, Neeta; Modak, Shakeel

    2015-01-01

    Background Although 131I-metaiodobenzylguanidine therapy (131I-MIBG) is increasingly used for children with high-risk neuroblastoma, a paucity of lead-lined rooms limits its wider use. We implemented radiation safety procedures to comply with New York City Department of Health and Mental Hygiene regulations for therapeutic radioisotopes and administered 131I-MIBG using rolling lead shields. Procedure Patients received 0.67GBq (18mCi)/kg/dose 131I-MIBG on an IRB-approved protocol (NCT00107289). Radiation safety procedures included private room with installation of rolling lead shields to maintain area dose rates ≤0.02mSv/h outside the room, patient isolation until dose rate <0.07mSv/h at 1m and retention of a urinary catheter with collection of urine in lead boxes. Parents were permitted in the patient’s room behind lead shields, trained in radiation safety principles and given real-time radiation monitors. Results Records on 16 131I-MIBG infusions among 10 patients (age 2–11 years) were reviewed. Mean ± standard deviation 131I-MIBG administered was 17.67±11.14 (range: 6.11–40.59) GBq. Mean maximum dose rates outside treatment rooms were 0.013±0.008 mSv/hr. Median time-to-discharge was 3 days post-131I-MIBG. Exposure of medical staff and parents was below regulatory limits. Cumulative whole-body dose received by the physician, nurse and radiation safety officer during treatment was 0.098±0.058, 0.056±0.045, 0.055±0.050 mSv respectively. Cumulative exposure to parents was 0.978±0.579mSv. Estimated annual radiation exposure for inpatient nurses was 0.096±0.034mSv/nurse. Thyroid bioassay scans on all medical personnel were safety procedures allows administration of high-dose 131I-MIBG and may broaden its use without dedicated lead-lined rooms. PMID:26773712

  4. Acquisition of Fire Safety Knowledge and Skills With Virtual Reality Simulation.

    PubMed

    Rossler, Kelly L; Sankaranarayanan, Ganesh; Duvall, Adrianne

    2018-05-25

    Prelicensure nursing students seeking to enter perioperative nursing need preparatory fire safety knowledge and skills training to participate as a member of an operating room (OR) team. This pilot study examined the effectiveness of the Virtual Electrosurgery Skill Trainer (VEST) on OR fire safety skills among prelicensure nursing students. An experimental pretest-posttest design was used in this study. Twenty nursing students were randomized to a control or an intervention group. Knowledge and skills acquisition of OR fire safety were assessed. There were no statistically significant findings in knowledge for either group. Fisher exact test demonstrated significant relationships between the skills performance criteria of following emergency procedures for a fire and demonstrating PASS (pull-aim-squeeze-sweep) technique (P = .001). Academic and hospital educators may consider incorporating virtual reality simulation to teach fire safety education or reinforce general fire safety practices to nursing students and novice nurses.

  5. 76 FR 38267 - The Federal Motor Carrier Safety Administration's 2011-2016 Strategic Plan: Raising the Safety Bar

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... Federal Docket Management System (FDMS) address: http://www.regulations.gov . Fax: 202-493-2251. Mail: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room... transport and logistics supply chain in improving CMV safety factors. This is a holistic view of safety that...

  6. Western Aeronautical Test Range (WATR) Mission Control Gold Room During X-29 Flight

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The mission control Gold room is seen here during a research flight of the X-29 at the Dryden Flight Research Center, Edwards, California. All aspects of a research mission are monitored from one of two of these control rooms at Dryden. Dryden and its control rooms are part of the Western Aeronautical Test Range (WATR). The WATR consists of a highly automated complex of computer controlled tracking, telemetry, and communications systems and control room complexes that are capable of supporting any type of mission ranging from system and component testing, to sub-scale and full-scale flight tests of new aircraft and reentry systems. Designated areas are assigned for spin/dive tests; corridors are provided for low, medium, and high-altitude supersonic flight; and special STOL/VSTOL facilities are available at Ames Moffett and Crows Landing. Special use airspace, available at Edwards, covers approximately twelve thousand square miles of mostly desert area. The southern boundary lies to the south of Rogers Dry Lake, the western boundary lies midway between Mojave and Bakersfield, the northern boundary passes just south of Bishop, and the eastern boundary follows about 25 miles west of the Nevada border except in the northern areas where it crosses into Nevada. Two X-29 aircraft, featuring one of the most unusual designs in aviation history, flew at the Ames-Dryden Flight Research Facility (now the Dryden Flight Research Center, Edwards, California) from 1984 to 1992. The fighter-sized X-29 technology demonstrators explored several concepts and technologies including: the use of advanced composites in aircraft construction; variable-camber wing surfaces; a unique forward- swept wing and its thin supercritical airfoil; strakes; close-coupled canards; and a computerized fly-by-wire flight control system used to maintain control of the otherwise unstable aircraft. Research results showed that the configuration of forward-swept wings, coupled with movable canards, gave

  7. Highway Safety Program Manual: Volume 16: Debris Hazard Control and Cleanup.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    Volume 16 of the 19-volume Highway Safety Program Manual (which provides guidance to State and local governments on preferred highway safety practices) concentrates on debris hazard control and cleanup. The purpose and objectives of such a program are outlined. Federal authority in the area of highway safety and policies regarding a debris control…

  8. A virtual clean room to teach USP 797 regulations for intravenous medications.

    PubMed

    Patel, Sheetal; Vincent, Ashley H; Abel, Steven R; Jacobs, Carolyn M; Dunlop, Steven R; Seibert, Megan

    2011-02-10

    To provide a virtual environment for pharmacy students to learn United States Pharmacopeia Chapter 797 (USP 797) requirements, while recognizing the role of pharmacists in the safe use of intravenous (IV) medications. A virtual laboratory was created that included stations for IV medications, product verification, medication safety, and patient cases pertaining to high-alert medications. Pharmacy students used 3-D glasses and a wireless controller to navigate through the session and identify violations of USP 797 regulations. Pre-assessments and post-assessments were administered to students who completed the session in each of the 2 years it was offered. In the first year, 88% of students strongly agreed or agreed that the sessions met their expectation. Following their APPE clerkship, 92% of these students felt the virtual IV room prepared them for the IV clean room experience. In the second year, 88% of students felt the experience enhanced their understanding of clean room procedures. After session completion, 75% of participants perceived medication errors to be more significant. Written examinations also were administered and students' mean scores improved significantly compared to those of students' prior to implementation of the session (89.6% in year 0; 91.2% in year 1; and 96.1% in year 2). The immersive virtual environment is a contemporary and effective way to teach USP 797 requirements and enhance the awareness of medication errors.

  9. A Virtual Clean Room to Teach USP 797 Regulations for Intravenous Medications

    PubMed Central

    Patel, Sheetal; Abel, Steven R.; Jacobs, Carolyn M.; Dunlop, Steven R.; Seibert, Megan

    2011-01-01

    Objective To provide a virtual environment for pharmacy students to learn United States Pharmacopeia Chapter 797 (USP 797) requirements, while recognizing the role of pharmacists in the safe use of intravenous (IV) medications. Design A virtual laboratory was created that included stations for IV medications, product verification, medication safety, and patient cases pertaining to high-alert medications. Pharmacy students used 3-D glasses and a wireless controller to navigate through the session and identify violations of USP 797 regulations. Assessment Preassessments and postassessments were administered to students who completed the session in each of the 2 years it was offered. In the first year, 88% of students strongly agreed or agreed that the sessions met their expectation. Following their APPE clerkship, 92% of these students felt the virtual IV room prepared them for the IV clean room experience. In the second year, 88% of students felt the experience enhanced their understanding of clean room procedures. After session completion, 75% of participants perceived medication errors to be more significant. Written examinations also were administered and students' mean scores improved significantly compared to those of students' prior to implementation of the session (89.6% in year 0; 91.2% in year 1; and 96.1% in year 2). Conclusion The immersive virtual environment is a contemporary and effective way to teach USP 797 requirements and enhance the awareness of medication errors. PMID:21451759

  10. 5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INSTRUMENT ROOM INTERIOR, SHOWING BACKS OF CONSOLE LOCKERS. Looking northeast to firing control room passageway. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA

  11. A HUMAN FACTORS ENGINEERING PROCESS TO SUPPORT HUMAN-SYSTEM INTERFACE DESIGN IN CONTROL ROOM MODERNIZATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kovesdi, C.; Joe, J.; Boring, R.

    The primary objective of the United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is to sustain operation of the existing commercial nuclear power plants (NPPs) through a multi-pathway approach in conducting research and development (R&D). The Advanced Instrumentation, Information, and Control (II&C) System Technologies pathway conducts targeted R&D to address aging and reliability concerns with legacy instrumentation and control (I&C) and other information systems in existing U.S. NPPs. Control room modernization is an important part following this pathway, and human factors experts at Idaho National Laboratory (INL) have been involved in conducting R&D to supportmore » migration of new digital main control room (MCR) technologies from legacy analog and legacy digital I&C. This paper describes a human factors engineering (HFE) process that supports human-system interface (HSI) design in MCR modernization activities, particularly with migration of old digital to new digital I&C. The process described in this work is an expansion from the LWRS Report INL/EXT-16-38576, and is a requirements-driven approach that aligns with NUREG-0711 requirements. The work described builds upon the existing literature by adding more detail around key tasks and decisions to make when transitioning from HSI Design into Verification and Validation (V&V). The overall objective of this process is to inform HSI design and elicit specific, measurable, and achievable human factors criteria for new digital technologies. Upon following this process, utilities should have greater confidence with transitioning from HSI design into V&V.« less

  12. Potential safety benefits of intelligent cruise control systems.

    PubMed

    Chira-Chavala, T; Yoo, S M

    1994-04-01

    Potential safety impact of a hypothetical intelligent cruise control system (ICCS) is evaluated in terms of changes in traffic accidents and some traffic operation characteristics affecting safety. The analysis of changes in traffic accidents is accomplished by in-depth examinations of police accident reports for four major counties in California. The evaluation of changes in traffic operation characteristics affecting safety is accomplished by vehicle simulation. The accident analysis reveals that the use of the hypothetical ICCS could potentially reduce traffic accidents by up to 7.5%. Preliminary vehicle simulation results based on a 10-vehicle convoy indicate that the use of the hypothetical ICCS could reduce frequencies of hard acceleration and deceleration, enhance speed harmonization among vehicles, and reduce incidence of "less-safe" headway.

  13. NASA personnel in a control room during the successful second flight of the X-43A aircraft

    NASA Image and Video Library

    2004-03-27

    NASA personnel in a control room during the successful second flight of the X-43A aircraft. front row, left to right: Randy Voland, LaRC Propulsion; Craig Christy, Boeing Systems; Dave Reubush, NASA Hyper-X Deputy Program Manager; and Vince Rausch, NASA Hyper-X Program Manager. back row, left to right: Bill Talley, DCI/consultant; Pat Stoliker, DFRC Director (Acting) of Research Engineering; John Martin, LaRC G&C; and Dave Bose, AMA/Controls.

  14. Inactivation of Poxviruses by Upper-Room UVC Light in a Simulated Hospital Room Environment

    PubMed Central

    McDevitt, James J.; Milton, Donald K.; Rudnick, Stephen N.; First, Melvin W.

    2008-01-01

    In the event of a smallpox outbreak due to bioterrorism, delays in vaccination programs may lead to significant secondary transmission. In the early phases of such an outbreak, transmission of smallpox will take place especially in locations where infected persons may congregate, such as hospital emergency rooms. Air disinfection using upper-room 254 nm (UVC) light can lower the airborne concentrations of infective viruses in the lower part of the room, and thereby control the spread of airborne infections among room occupants without exposing occupants to a significant amount of UVC. Using vaccinia virus aerosols as a surrogate for smallpox we report on the effectiveness of air disinfection, via upper-room UVC light, under simulated real world conditions including the effects of convection, mechanical mixing, temperature and relative humidity. In decay experiments, upper-room UVC fixtures used with mixing by a conventional ceiling fan produced decreases in airborne virus concentrations that would require additional ventilation of more than 87 air changes per hour. Under steady state conditions the effective air changes per hour associated with upper-room UVC ranged from 18 to 1000. The surprisingly high end of the observed range resulted from the extreme susceptibility of vaccinia virus to UVC at low relative humidity and use of 4 UVC fixtures in a small room with efficient air mixing. Increasing the number of UVC fixtures or mechanical ventilation rates resulted in greater fractional reduction in virus aerosol and UVC effectiveness was higher in winter compared to summer for each scenario tested. These data demonstrate that upper-room UVC has the potential to greatly reduce exposure to susceptible viral aerosols. The greater survival at baseline and greater UVC susceptibility of vaccinia under winter conditions suggest that while risk from an aerosol attack with smallpox would be greatest in winter, protective measures using UVC may also be most efficient at this

  15. Device- and system-independent personal touchless user interface for operating rooms : One personal UI to control all displays in an operating room.

    PubMed

    Ma, Meng; Fallavollita, Pascal; Habert, Séverine; Weidert, Simon; Navab, Nassir

    2016-06-01

    In the modern day operating room, the surgeon performs surgeries with the support of different medical systems that showcase patient information, physiological data, and medical images. It is generally accepted that numerous interactions must be performed by the surgical team to control the corresponding medical system to retrieve the desired information. Joysticks and physical keys are still present in the operating room due to the disadvantages of mouses, and surgeons often communicate instructions to the surgical team when requiring information from a specific medical system. In this paper, a novel user interface is developed that allows the surgeon to personally perform touchless interaction with the various medical systems, switch effortlessly among them, all of this without modifying the systems' software and hardware. To achieve this, a wearable RGB-D sensor is mounted on the surgeon's head for inside-out tracking of his/her finger with any of the medical systems' displays. Android devices with a special application are connected to the computers on which the medical systems are running, simulating a normal USB mouse and keyboard. When the surgeon performs interaction using pointing gestures, the desired cursor position in the targeted medical system display, and gestures, are transformed into general events and then sent to the corresponding Android device. Finally, the application running on the Android devices generates the corresponding mouse or keyboard events according to the targeted medical system. To simulate an operating room setting, our unique user interface was tested by seven medical participants who performed several interactions with the visualization of CT, MRI, and fluoroscopy images at varying distances from them. Results from the system usability scale and NASA-TLX workload index indicated a strong acceptance of our proposed user interface.

  16. [Operation room management in quality control certification of a mainstream hospital].

    PubMed

    Leidinger, W; Meierhofer, J N; Schüpfer, G

    2006-11-01

    We report the results of our study concerning the organisation of operating room (OR) capacity planned 1 year in advance. The use of OR is controlled using 2 global controlling numbers: a) the actual time difference between the expected optimal and previously calculated OR running time and b) the punctuality of starting the first operation in each OR. The focal point of the presented OR management concept is a consensus-oriented decision-making and steering process led by a coordinator who achieves a high degree of acceptance by means of comprehensive transparency. Based on the accepted running time, the optimal productivity of OR's (OP_A(%) can be calculated. In this way an increase of the overall capacity (actual running time) of ORs was from 40% to over 55% was achieved. Nevertheless, enthusiasm and teamwork from all persons involved in the system are vital for success as well as a completely independent operating theatre manager. Using this concept over 90% of the requirements for the new certification catalogue for hospitals in Germany was achieved.

  17. Advanced visualization platform for surgical operating room coordination: distributed video board system.

    PubMed

    Hu, Peter F; Xiao, Yan; Ho, Danny; Mackenzie, Colin F; Hu, Hao; Voigt, Roger; Martz, Douglas

    2006-06-01

    One of the major challenges for day-of-surgery operating room coordination is accurate and timely situation awareness. Distributed and secure real-time status information is key to addressing these challenges. This article reports on the design and implementation of a passive status monitoring system in a 19-room surgical suite of a major academic medical center. Key design requirements considered included integrated real-time operating room status display, access control, security, and network impact. The system used live operating room video images and patient vital signs obtained through monitors to automatically update events and operating room status. Images were presented on a "need-to-know" basis, and access was controlled by identification badge authorization. The system delivered reliable real-time operating room images and status with acceptable network impact. Operating room status was visualized at 4 separate locations and was used continuously by clinicians and operating room service providers to coordinate operating room activities.

  18. Procedure and information displays in advanced nuclear control rooms: experimental evaluation of an integrated design.

    PubMed

    Chen, Yue; Gao, Qin; Song, Fei; Li, Zhizhong; Wang, Yufan

    2017-08-01

    In the main control rooms of nuclear power plants, operators frequently have to switch between procedure displays and system information displays. In this study, we proposed an operation-unit-based integrated design, which combines the two displays to facilitate the synthesis of information. We grouped actions that complete a single goal into operation units and showed these operation units on the displays of system states. In addition, we used different levels of visual salience to highlight the current unit and provided a list of execution history records. A laboratory experiment, with 42 students performing a simulated procedure to deal with unexpected high pressuriser level, was conducted to compare this design against an action-based integrated design and the existing separated-displays design. The results indicate that our operation-unit-based integrated design yields the best performance in terms of time and completion rate and helped more participants to detect unexpected system failures. Practitioner Summary: In current nuclear control rooms, operators frequently have to switch between procedure and system information displays. We developed an integrated design that incorporates procedure information into system displays. A laboratory study showed that the proposed design significantly improved participants' performance and increased the probability of detecting unexpected system failures.

  19. Operating room metrics score card-creating a prototype for individualized feedback.

    PubMed

    Gabriel, Rodney A; Gimlich, Robert; Ehrenfeld, Jesse M; Urman, Richard D

    2014-11-01

    The balance between reducing costs and inefficiencies with that of patient safety is a challenging problem faced in the operating room suite. An ongoing challenge is the creation of effective strategies that reduce these inefficiencies and provide real-time personalized metrics and electronic feedback to anesthesia practitioners. We created a sample report card structure, utilizing existing informatics systems. This system allows to gather and analyze operating room metrics for each anesthesia provider and offer personalized feedback. To accomplish this task, we identified key metrics that represented time and quality parameters. We collected these data for individual anesthesiologists and compared performance to the overall group average. Data were presented as an electronic score card and made available to individual clinicians on a real-time basis in an effort to provide effective feedback. These metrics included number of cancelled cases, average turnover time, average time to operating room ready and patient in room, number of delayed first case starts, average induction time, average extubation time, average time to recovery room arrival to discharge, performance feedback from other providers, compliance to various protocols, and total anesthetic costs. The concept we propose can easily be generalized to a variety of operating room settings, types of facilities and OR health care professionals. Such a scorecard can be created using content that is important for operating room efficiency, research, and practice improvement for anesthesia providers.

  20. Improvement of a Chemical Storage Room Ventilation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yousif, Emad; Al-Dahhan, Wedad; Abed, Rashed Nema

    Scientists at universities across Iraq are actively working to report actual incidents and accidents occurring in their laboratories, as well as structural improvements made to improve safety and security, to raise awareness and encourage openness, leading to widespread adoption of robust Chemical Safety and Security (CSS) practices. This manuscript is the third in a series of five case studies describing laboratory incidents, accidents, and laboratory improvements. We summarize an improvement to the chemical storage room ventilation system at Al-Nahrain University to create and maintain a safe working atmosphere in an area where chemicals are stored and handled, using US andmore » European design practices, standards, and regulations.« less

  1. Job characteristics and safety climate: the role of effort-reward and demand-control-support models.

    PubMed

    Phipps, Denham L; Malley, Christine; Ashcroft, Darren M

    2012-07-01

    While safety climate is widely recognized as a key influence on organizational safety, there remain questions about the nature of its antecedents. One potential influence on safety climate is job characteristics (that is, psychosocial features of the work environment). This study investigated the relationship between two job characteristics models--demand-control-support (Karasek & Theorell, 1990) and effort-reward imbalance (Siegrist, 1996)--and safety climate. A survey was conducted with a random sample of 860 British retail pharmacists, using the job contents questionnaire (JCQ), effort-reward imbalance indicator (ERI) and a measure of safety climate in pharmacies. Multivariate data analyses found that: (a) both models contributed to the prediction of safety climate ratings, with the demand-control-support model making the largest contribution; (b) there were some interactions between demand, control and support from the JCQ in the prediction of safety climate scores. The latter finding suggests the presence of "active learning" with respect to safety improvement in high demand, high control settings. The findings provide further insight into the ways in which job characteristics relate to safety, both individually and at an aggregated level.

  2. A Distributed Control System Prototyping Environment to Support Control Room Modernization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lew, Roger Thomas; Boring, Ronald Laurids; Ulrich, Thomas Anthony

    Operators of critical processes, such as nuclear power production, must contend with highly complex systems, procedures, and regulations. Developing human-machine interfaces (HMIs) that better support operators is a high priority for ensuring the safe and reliable operation of critical processes. Human factors engineering (HFE) provides a rich and mature set of tools for evaluating the performance of HMIs, however the set of tools for developing and designing HMIs is still in its infancy. Here we propose a rapid prototyping approach for integrating proposed HMIs into their native environments before a design is finalized. This approach allows researchers and developers tomore » test design ideas and eliminate design flaws prior to fully developing the new system. We illustrate this approach with four prototype designs developed using Microsoft’s Windows Presentation Foundation (WPF). One example is integrated into a microworld environment to test the functionality of the design and identify the optimal level of automation for a new system in a nuclear power plant. The other three examples are integrated into a full-scale, glasstop digital simulator of a nuclear power plant. One example demonstrates the capabilities of next generation control concepts; another aims to expand the current state of the art; lastly, an HMI prototype was developed as a test platform for a new control system currently in development at U.S. nuclear power plants. WPF possesses several characteristics that make it well suited to HMI design. It provides a tremendous amount of flexibility, agility, robustness, and extensibility. Distributed control system (DCS) specific environments tend to focus on the safety and reliability requirements for real-world interfaces and consequently have less emphasis on providing functionality to support novel interaction paradigms. Because of WPF’s large user-base, Microsoft can provide an extremely mature tool. Within process control applications

  3. Economic analysis of linking operating room scheduling and hospital material management information systems for just-in-time inventory control.

    PubMed

    Epstein, R H; Dexter, F

    2000-08-01

    Operating room (OR) scheduling information systems can decrease perioperative labor costs. Material management information systems can decrease perioperative inventory costs. We used computer simulation to investigate whether using the OR schedule to trigger purchasing of perioperative supplies is likely to further decrease perioperative inventory costs, as compared with using sophisticated, stand-alone material management inventory control. Although we designed the simulations to favor financially linking the information systems, we found that this strategy would be expected to decrease inventory costs substantively only for items of high price ($1000 each) and volume (>1000 used each year). Because expensive items typically have different models and sizes, each of which is used by a hospital less often than this, for almost all items there will be no benefit to making daily adjustments to the order volume based on booked cases. We conclude that, in a hospital with a sophisticated material management information system, OR managers will probably achieve greater cost reductions from focusing on negotiating less expensive purchase prices for items than on trying to link the OR information system with the hospital's material management information system to achieve just-in-time inventory control. In a hospital with a sophisticated material management information system, operating room managers will probably achieve greater cost reductions from focusing on negotiating less expensive purchase prices for items than on trying to link the operating room information system with the hospital's material management information system to achieve just-in-time inventory control.

  4. Adaptive control of 5 DOF upper-limb exoskeleton robot with improved safety.

    PubMed

    Kang, Hao-Bo; Wang, Jian-Hui

    2013-11-01

    This paper studies an adaptive control strategy for a class of 5 DOF upper-limb exoskeleton robot with a special safety consideration. The safety requirement plays a critical role in the clinical treatment when assisting patients with shoulder, elbow and wrist joint movements. With the objective of assuring the tracking performance of the pre-specified operations, the proposed adaptive controller is firstly designed to be robust to the model uncertainties. To further improve the safety and fault-tolerance in the presence of unknown large parameter variances or even actuator faults, the adaptive controller is on-line updated according to the information provided by an adaptive observer without additional sensors. An output tracking performance is well achieved with a tunable error bound. The experimental example also verifies the effectiveness of the proposed control scheme. © 2013 ISA. Published by ISA. All rights reserved.

  5. National Transportation Safety Board : weak internal control impaired financial accountability

    DOT National Transportation Integrated Search

    2001-09-28

    The U. S. General Accounting Office (GAO) was asked to review the National Transportation Safety Board's (NTSB) internal controls over selected types of fiscal year expenditures. They were asked to determine whether internal control weaknesses were a...

  6. 77 FR 33495 - Maritime Advisory Committee for Occupational Safety and Health (MACOSH)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... DEPARTMENT OF LABOR Occupational Safety and Health Administration [Docket No. OSHA-2012-0003] Maritime Advisory Committee for Occupational Safety and Health (MACOSH) AGENCY: Occupational Safety and..., Docket No. OSHA- 2012-0003, U.S. Department of Labor, Occupational Safety and Health Administration, Room...

  7. Room Acoustics

    NASA Astrophysics Data System (ADS)

    Kuttruff, Heinrich; Mommertz, Eckard

    The traditional task of room acoustics is to create or formulate conditions which ensure the best possible propagation of sound in a room from a sound source to a listener. Thus, objects of room acoustics are in particular assembly halls of all kinds, such as auditoria and lecture halls, conference rooms, theaters, concert halls or churches. Already at this point, it has to be pointed out that these conditions essentially depend on the question if speech or music should be transmitted; in the first case, the criterion for transmission quality is good speech intelligibility, in the other case, however, the success of room-acoustical efforts depends on other factors that cannot be quantified that easily, not least it also depends on the hearing habits of the listeners. In any case, absolutely "good acoustics" of a room do not exist.

  8. 78 FR 979 - Petition for Positive Train Control Safety Plan Approval and System Certification of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ...] Petition for Positive Train Control Safety Plan Approval and System Certification of the Electronic Train... the Federal Railroad Administration (FRA) for Positive Train Control (PTC) Safety Plan (PTCSP...-based train control system safety overlay designed to protect against the consequences of train-to-train...

  9. Wash room, bunkhouse, first floor interior. This room is a ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Wash room, bunkhouse, first floor interior. This room is a screened porch with the original sinks extant. Light and ventilation was borrowed from the wash room into the toilets and bathing rooms. - Sespe Ranch, Bunkhouse, 2896 Telegraph Road, Fillmore, Ventura County, CA

  10. Case-control analysis in highway safety: Accounting for sites with multiple crashes.

    PubMed

    Gross, Frank

    2013-12-01

    There is an increased interest in the use of epidemiological methods in highway safety analysis. The case-control and cohort methods are commonly used in the epidemiological field to identify risk factors and quantify the risk or odds of disease given certain characteristics and factors related to an individual. This same concept can be applied to highway safety where the entity of interest is a roadway segment or intersection (rather than a person) and the risk factors of interest are the operational and geometric characteristics of a given roadway. One criticism of the use of these methods in highway safety is that they have not accounted for the difference between sites with single and multiple crashes. In the medical field, a disease either occurs or it does not; multiple occurrences are generally not an issue. In the highway safety field, it is necessary to evaluate the safety of a given site while accounting for multiple crashes. Otherwise, the analysis may underestimate the safety effects of a given factor. This paper explores the use of the case-control method in highway safety and two variations to account for sites with multiple crashes. Specifically, the paper presents two alternative methods for defining cases in a case-control study and compares the results in a case study. The first alternative defines a separate case for each crash in a given study period, thereby increasing the weight of the associated roadway characteristics in the analysis. The second alternative defines entire crash categories as cases (sites with one crash, sites with two crashes, etc.) and analyzes each group separately in comparison to sites with no crashes. The results are also compared to a "typical" case-control application, where the cases are simply defined as any entity that experiences at least one crash and controls are those entities without a crash in a given period. In a "typical" case-control design, the attributes associated with single-crash segments are weighted

  11. Operating room sound level hazards for patients and physicians.

    PubMed

    Fritsch, Michael H; Chacko, Chris E; Patterson, Emily B

    2010-07-01

    Exposure to certain new surgical instruments and operating room devices during procedures could cause hearing damage to patients and personnel. Surgical instruments and related equipment generate significant sound levels during routine usage. Both patients and physicians are exposed to these levels during the operative cases, many of which can last for hours. The noise loads during cases are cumulative. Occupational Safety and Health Administration (OSHA) and National Institute for Occupational Safety and Health (NIOSH) standards are inconsistent in their appraisals of potential damage. Implications of the newer power instruments are not widely recognized. Bruel and Kjaer sound meter spectral recordings for 20 major instruments from 5 surgical specialties were obtained at the ear levels for the patient and the surgeon between 32 and 20 kHz. Routinely used instruments generated sound levels as high as 131 dB. Patient and operator exposures differed. There were unilateral dominant exposures. Many instruments had levels that became hazardous well within the length of an average surgical procedure. The OSHA and NIOSH systems gave contradicting results when applied to individual instruments and types of cases. Background noise, especially in its intermittent form, was also of significant nature. Some patients and personnel have additional predisposing physiologic factors. Instrument noise levels for average length surgical cases may exceed OSHA and NIOSH recommendations for hearing safety. Specialties such as Otolaryngology, Orthopedics, and Neurosurgery use instruments that regularly exceed limits. General operating room noise also contributes to overall personnel exposures. Innovative countermeasures are suggested.

  12. Repurposing historical control clinical trial data to provide safety context.

    PubMed

    Bhuyan, Prakash; Desai, Jigar; Louis, Matthew St; Carlsson, Martin; Bowen, Edward; Danielson, Mark; Cantor, Michael N

    2016-02-01

    Billions of dollars spent, millions of subject-hours of clinical trial experience and an abundance of archived study-level data, yet why are historical data underutilized? We propose that historical data can be aggregated to provide safety, background incidence rate and context to improve the evaluation of new medicinal products. Here, we describe the development and application of the eControls database, which is derived from the control arms of studies of licensed products, and discuss the challenges and potential solutions to the proper application of historical data to help interpret product safety. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Staff corridor (room 206, representing rooms 301, 305, 401, 405, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Staff corridor (room 206, representing rooms 301, 305, 401, 405, 501, and 505), looking south towards the staff corridor vestibule (room 206A, representing rooms 305A, 405A, and 505A). - California State Office Building No. 1, 915 Capitol Mall, Sacramento, Sacramento County, CA

  14. Biological safety cabinetry.

    PubMed Central

    Kruse, R H; Puckett, W H; Richardson, J H

    1991-01-01

    The biological safety cabinet is the one piece of laboratory and pharmacy equipment that provides protection for personnel, the product, and the environment. Through the history of laboratory-acquired infections from the earliest published case to the emergence of hepatitis B and AIDS, the need for health care worker protection is described. A brief description with design, construction, function, and production capabilities is provided for class I and class III safety cabinets. The development of the high-efficiency particulate air filter provided the impetus for clean room technology, from which evolved the class II laminar flow biological safety cabinet. The clean room concept was advanced when the horizontal airflow clean bench was manufactured; it became popular in pharmacies for preparing intravenous solutions because the product was protected. However, as with infectious microorganisms and laboratory workers, individual sensitization to antibiotics and the advent of hazardous antineoplastic agents changed the thinking of pharmacists and nurses, and they began to use the class II safety cabinet to prevent adverse personnel reactions to the drugs. How the class II safety cabinet became the mainstay in laboratories and pharmacies is described, and insight is provided into the formulation of National Sanitation Foundation standard number 49 and its revisions. The working operations of a class II cabinet are described, as are the variations of the four types with regard to design, function, air velocity profiles, and the use of toxins. The main certification procedures are explained, with examples of improper or incorrect certifications. The required levels of containment for microorganisms are given. Instructions for decontaminating the class II biological safety cabinet of infectious agents are provided; unfortunately, there is no method for decontaminating the cabinet of antineoplastic agents. Images PMID:2070345

  15. HWCTR CONTROL ROD AND SAFETY ROD DRIVE SYSTEMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kale, S.H.

    1963-07-01

    The Heavy Water Components Test Reactor (HWCTR) is a pressurized, D/sub 2/O reactor designed for operation up to 70 Mw at 1500 psig and 3l5 deg C. It has 18 control rods and six safety rods, each driven by an electric motor through a rack and pinion gear train. Racks, pinions, and bearings are located inside individual pressure housings that are penetrated by means of floating ring labyrinth seals. The drives are mounted on the reactor vessel top head. Safety rods have electromagnetic clutches and fall into the reactor when scrammed. The reliability and performance of the rod drives aremore » very good. Seal leakage is well within design limits. Recent inspections of seals and control rod plants showed no evidence of crud buildup or stress corrosion cracking of type 17- 4PH'' stainless steel components. (auth)« less

  16. Preliminary Marine Safety Risk Assessment, Brandon Road Lock and Dam Invasive Species Control Measures

    DTIC Science & Technology

    2016-12-01

    i Classification | CG-926 RDC | author | audience | month year Preliminary Marine Safety Risk Assessment, Brandon Road Lock & Dam...No. 4. Title and Subtitle Preliminary Marine Safety Risk Assessment, Brandon Road Lock & Dam Invasive Species Control Measures 5. Report Date...safety due to proposed invasive species control measures located in the vicinity of the Brandon Road Lock and Dam (BRLD) Navigation Project on the

  17. [Feasibility and relevance of an operating room safety checklist for developing countries: Study in a French hospital in Djibouti].

    PubMed

    Becret, A; Clapson, P; Andro, C; Chapelier, X; Gauthier, J; Kaiser, E

    2013-01-01

    The use of the World Health Organization surgical safety checklist, mandatory in operating rooms (OR) in France, significantly reduces morbidity and mortality. Our objective was to evaluate the use of this checklist in the OR of a French military hospital in Djibouti (Horn of Africa). The study was performed in three stages: a retrospective evaluation of the checklist use over the previous two months, to assess the utilization and completeness rates; provision of information to the OR staff; and thereafter, prospective evaluation for a one-month period of checklist use, the reasons for non-compliance, and the cases in which the checklist identified errors and thus prevented serious adverse events. The initial utilization rate was 49%, with only 24% complete. After staff training and during the study these rates reached 100% and 99%. The staff encountered language difficulties in 53% of cases, and an interpreter was available for 81% of them. The capacity of the surgical safety checklist to detect serious adverse events was highlighted. The utilization and completeness rates were initially worse than those observed in metropolitan French ORs, but a simple staff information program was rapidly effective. Language difficulties are frequent but an interpreter is often available, unlike in developed countries where language problems are uncommon and the availability of interpreters difficult. Moreover, this study illustrates the ability of the checklist to detect and therefore prevent potentially serious adverse events.

  18. Effects of organizational safety practices and perceived safety climate on PPE usage, engineering controls, and adverse events involving liquid antineoplastic drugs among nurses.

    PubMed

    DeJoy, David M; Smith, Todd D; Woldu, Henok; Dyal, Mari-Amanda; Steege, Andrea L; Boiano, James M

    2017-07-01

    Antineoplastic drugs pose risks to the healthcare workers who handle them. This fact notwithstanding, adherence to safe handling guidelines remains inconsistent and often poor. This study examined the effects of pertinent organizational safety practices and perceived safety climate on the use of personal protective equipment, engineering controls, and adverse events (spill/leak or skin contact) involving liquid antineoplastic drugs. Data for this study came from the 2011 National Institute for Occupational Safety and Health (NIOSH) Health and Safety Practices Survey of Healthcare Workers which included a sample of approximately 1,800 nurses who had administered liquid antineoplastic drugs during the past seven days. Regression modeling was used to examine predictors of personal protective equipment use, engineering controls, and adverse events involving antineoplastic drugs. Approximately 14% of nurses reported experiencing an adverse event while administering antineoplastic drugs during the previous week. Usage of recommended engineering controls and personal protective equipment was quite variable. Usage of both was better in non-profit and government settings, when workers were more familiar with safe handling guidelines, and when perceived management commitment to safety was higher. Usage was poorer in the absence of specific safety handling procedures. The odds of adverse events increased with number of antineoplastic drugs treatments and when antineoplastic drugs were administered more days of the week. The odds of such events were significantly lower when the use of engineering controls and personal protective equipment was greater and when more precautionary measures were in place. Greater levels of management commitment to safety and perceived risk were also related to lower odds of adverse events. These results point to the value of implementing a comprehensive health and safety program that utilizes available hazard controls and effectively communicates

  19. Evaluating a Website to Teach Children Safety with Dogs: A Randomized Controlled Trial

    PubMed Central

    Schwebel, David C.; Li, Peng; McClure, Leslie A.; Severson, Joan

    2016-01-01

    Dog bites represent a significant threat to child health. Theory-driven interventions scalable for broad dissemination are sparse. A website was developed to teach children dog safety via increased knowledge, improved cognitive skills in relevant domains, and increased perception of vulnerability to bites. A randomized controlled trial was conducted with 69 children aged 4–5 randomly assigned to use the dog safety website or a control transportation safety website for ~3 weeks. Assessment of dog safety knowledge and behavior plus skill in three relevant cognitive constructs (impulse control, noticing details, and perspective-taking) was conducted both at baseline and following website use. The dog safety website incorporated interactive games, instructional videos including testimonials, a motivational rewards system, and messaging to parents concerning child lessons. Our results showed that about two-thirds of the intervention sample was not adherent to website use at home, so both intent-to-treat and per-protocol analyses were conducted. Intent-to-treat analyses yielded mostly null results. Per-protocol analyses suggested children compliant to the intervention protocol scored higher on knowledge and recognition of safe behavior with dogs following the intervention compared to the control group. Adherent children also had improved scores post-intervention on the cognitive skill of noticing details compared to the control group. We concluded that young children’s immature cognition can lead to dog bites. Interactive eHealth training on websites shows potential to teach children relevant cognitive and safety skills to reduce risk. Compliance to website use is a challenge, and some relevant cognitive skills (e.g., noticing details) may be more amenable to computer-based training than others (e.g., impulse control). PMID:27918466

  20. Evaluating a Website to Teach Children Safety with Dogs: A Randomized Controlled Trial.

    PubMed

    Schwebel, David C; Li, Peng; McClure, Leslie A; Severson, Joan

    2016-12-02

    Dog bites represent a significant threat to child health. Theory-driven interventions scalable for broad dissemination are sparse. A website was developed to teach children dog safety via increased knowledge, improved cognitive skills in relevant domains, and increased perception of vulnerability to bites. A randomized controlled trial was conducted with 69 children aged 4-5 randomly assigned to use the dog safety website or a control transportation safety website for ~3 weeks. Assessment of dog safety knowledge and behavior plus skill in three relevant cognitive constructs (impulse control, noticing details, and perspective-taking) was conducted both at baseline and following website use. The dog safety website incorporated interactive games, instructional videos including testimonials, a motivational rewards system, and messaging to parents concerning child lessons. Our results showed that about two-thirds of the intervention sample was not adherent to website use at home, so both intent-to-treat and per-protocol analyses were conducted. Intent-to-treat analyses yielded mostly null results. Per-protocol analyses suggested children compliant to the intervention protocol scored higher on knowledge and recognition of safe behavior with dogs following the intervention compared to the control group. Adherent children also had improved scores post-intervention on the cognitive skill of noticing details compared to the control group. We concluded that young children's immature cognition can lead to dog bites. Interactive eHealth training on websites shows potential to teach children relevant cognitive and safety skills to reduce risk. Compliance to website use is a challenge, and some relevant cognitive skills (e.g., noticing details) may be more amenable to computer-based training than others (e.g., impulse control).

  1. [Healthcare-Associated Infection Control with Awareness of Patient Safety].

    PubMed

    Murakami, Nobuo

    2016-03-01

    In order to provide safe and secure medical care for patients, health care-associated infections (HAI) must not occur. HAI should be considered as incidents, and countermeasures should be viewed as a patient safety management itself. Healthcare-associated infection control (HAIC) is practiced by the infection control team (ICT), which is based on multidisciplinary cooperation. Team members have to recognize that it is the most important to make use of the expertise of each discipline. In addition, all members must try to respond quickly, to help the clinic staff. Visualized rapid information provision and sharing, environmental improvement, outbreak factor analysis, hand hygiene compliance rate improvement, proper antibiotic use (Antimicrobial Stewardship Program: ASP), and regional cooperation & leadership comprise the role of the ICT in the flagship hospital. Regarding this role, we present our hospital's efforts and the outcomes. In conclusion, for medical practice quality improvement, healthcare-associated infection control should be conducted thoroughly along with an awareness of patient safety.

  2. SOUTH WING, MTR661. INTERIOR DETAIL INSIDE LAB ROOM 131. CAMERA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SOUTH WING, MTR-661. INTERIOR DETAIL INSIDE LAB ROOM 131. CAMERA FACING NORTHEAST. NOTE CONCRETE BLOCK WALLS. SAFETY SHOWER AND EYE WASHER AT REAR WALL. INL NEGATIVE NO. HD46-7-2. Mike Crane, Photographer, 2/2005. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  3. Observing the work of an urban safety-net psychiatric emergency room: managing the unmanageable

    PubMed Central

    Lincoln, Alisa K.; White, Andrew; Aldsworth, Casandra; Johnson, Peggy; Strunin, Lee

    2010-01-01

    Staff in the psychiatric emergency room (PER) have demanding jobs requiring a complex balance between the needs and safety of the individual and the community, systemic resources, and job responsibilities while providing timely, effective care. Little research exists concerning day-to-day work activities of PER staff, their interaction, and their perceptions of their work. This study explored the work of PER staff and the organisational context of the PER work setting. Observations of staff were conducted in the public spaces of a public urban PER using two observational techniques. The first was designed to measure the types of work activities staff engaged in and the time spent in these work activities (work task data). The second technique was the gathering of observational data by a peripheral-member-researcher (participant observation data). Analyses were conducted of both the work task and participant observation data. Results indicate that most PER staff time is spent in administrative and phone tasks, while less than a third is spent on direct clinical work. Four important issues for PER work were identified: a workload that is unmanageable, managing the unmanageable, bogus referrals and dumping and insurance problems. The PER remains the front-line of the medical and social service systems. Work done in these settings is of critical importance; however little attention is paid to the content and nature of the work. Our study demonstrates that staff of the PER face challenges on many levels as they struggle with the task of working with people presenting in psychiatric and social crisis. PMID:20149148

  4. 20. VIEW OF CONSOLE IN NORTHWEST CORNER OF SLC3W CONTROL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF CONSOLE IN NORTHWEST CORNER OF SLC-3W CONTROL ROOM. PANELS FROM LEFT TO RIGHT: OPERATIONS AND CHECKOUT (LABELED POWER CONTROL AND MONITOR PANEL); RANGE SAFETY (LABELED DESTRUCT SYSTEM CONTROL AND MONITOR PANEL); BATTERY CLOCK PANELS. PEDAL FOR FOOT CONTROL OF COMMUNICATIONS HEADSET AND HEADSET IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  5. Administrative goals and safety standards for hazard control on forested recreation sites

    Treesearch

    Lee A. Paine

    1973-01-01

    For efficient control of tree hazard on recreation sites, a specific administrative goal must be selected. A safety standard designed to achieve the selected goal and a uniform hazard-rating procedure will then promote a consistent level of safety at an acceptable cost. Safety standards can be established with the aid of data for past years, and dollar evaluations are...

  6. Room Temperature Hard Radiation Detectors Based on Solid State Compound Semiconductors: An Overview

    NASA Astrophysics Data System (ADS)

    Mirzaei, Ali; Huh, Jeung-Soo; Kim, Sang Sub; Kim, Hyoun Woo

    2018-05-01

    Si and Ge single crystals are the most common semiconductor radiation detectors. However, they need to work at cryogenic temperatures to decrease their noise levels. In contrast, compound semiconductors can be operated at room temperature due to their ability to grow compound materials with tunable densities, band gaps and atomic numbers. Highly efficient room temperature hard radiation detectors can be utilized in biomedical diagnostics, nuclear safety and homeland security applications. In this review, we discuss room temperature compound semiconductors. Since the field of radiation detection is broad and a discussion of all compound materials for radiation sensing is impossible, we discuss the most important materials for the detection of hard radiation with a focus on binary heavy metal semiconductors and ternary and quaternary chalcogenide compounds.

  7. The heat is on: room temperature affects laboratory equipment--an observational study.

    PubMed

    Butler, Julia M; Johnson, Jane E; Boone, William R

    2013-10-01

    To evaluate the effect of ambient room temperature on equipment typically used in in vitro fertilization (IVF). We set the control temperature of the room to 20 °C (+/-0.3) and used CIMScan probes to record temperatures of the following equipment: six microscope heating stages, four incubators, five slide warmers and three heating blocks. We then increased the room temperature to 26 °C (+/-0.3) or decreased it to 17 °C (+/-0.3) and monitored the same equipment again. We wanted to determine what role, if any, changing room temperature has on equipment temperature fluctuation. There was a direct relationship between room temperature and equipment temperature stability. When room temperature increased or decreased, equipment temperature reacted in a corresponding manner. Statistical differences between equipment were found when the room temperature changed. What is also noteworthy is that temperature of equipment responded within 5 min to a change in room temperature. Clearly, it is necessary to be aware of the affect of room temperature on equipment when performing assisted reproductive procedures. Room and equipment temperatures should be monitored faithfully and adjusted as frequently as needed, so that consistent culture conditions can be maintained. If more stringent temperature control can be achieved, human assisted reproduction success rates may improve.

  8. Single-Use Energy Sources and Operating Room Time for Laparoscopic Hysterectomy: A Randomized Controlled Trial.

    PubMed

    Holloran-Schwartz, M Brigid; Gavard, Jeffrey A; Martin, Jared C; Blaskiewicz, Robert J; Yeung, Patrick P

    2016-01-01

    To compare the intraoperative direct costs of a single-use energy device with reusable energy devices during laparoscopic hysterectomy. A randomized controlled trial (Canadian Task Force Classification I). An academic hospital. Forty-six women who underwent laparoscopic hysterectomy from March 2013 to September 2013. Each patient served as her own control. One side of the uterine attachments was desiccated and transected with the single-use device (Ligasure 5-mm Blunt Tip LF1537 with the Force Triad generator). The other side was desiccated and transected with reusable bipolar forceps (RoBi 5 mm), and transected with monopolar scissors using the same Covidien Force Triad generator. The instrument approach used was randomized to the attending physician who was always on the patient's left side. Resident physicians always operated on the patient's right side and used the converse instruments of the attending physician. Start time was recorded at the utero-ovarian pedicle and end time was recorded after transection of the uterine artery on the same side. Costs included the single-use device; amortized costs of the generator, reusable instruments, and cords; cleaning and packaging of reusable instruments; and disposal of the single-use device. Operating room time was $94.14/min. We estimated that our single use-device cost $630.14 and had a total time savings of 6.7 min per case, or 3.35 min per side, which could justify the expense of the device. The single-use energy device had significant median time savings (-4.7 min per side, p < .001) and total intraoperative direct cost savings ($254.16 per case). A single-use energy device that both desiccates and cuts significantly reduced operating room time to justify its own cost, and it also reduced total intraoperative direct costs during laparoscopic hysterectomy in our institution. Operating room cost per minute varies between institutions and must be considered before generalizing our results. Copyright © 2016

  9. 37. INTERIOR VIEW TO THE WEST OF ROOM 203, THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. INTERIOR VIEW TO THE WEST OF ROOM 203, THE CONTROL ROOM FOR THE DISASSEMBLY BAY. - Nevada Test Site, Reactor Maintenance Assembly & Dissassembly Facility, Area 25, Jackass Flats, Junction of Roads F & G, Mercury, Nye County, NV

  10. 'In situ simulation' versus 'off site simulation' in obstetric emergencies and their effect on knowledge, safety attitudes, team performance, stress, and motivation: study protocol for a randomized controlled trial

    PubMed Central

    2013-01-01

    Background Unexpected obstetric emergencies threaten the safety of pregnant women. As emergencies are rare, they are difficult to learn. Therefore, simulation-based medical education (SBME) seems relevant. In non-systematic reviews on SBME, medical simulation has been suggested to be associated with improved learner outcomes. However, many questions on how SBME can be optimized remain unanswered. One unresolved issue is how 'in situ simulation' (ISS) versus 'off site simulation' (OSS) impact learning. ISS means simulation-based training in the actual patient care unit (in other words, the labor room and operating room). OSS means training in facilities away from the actual patient care unit, either at a simulation centre or in hospital rooms that have been set up for this purpose. Methods and design The objective of this randomized trial is to study the effect of ISS versus OSS on individual learning outcome, safety attitude, motivation, stress, and team performance amongst multi-professional obstetric-anesthesia teams. The trial is a single-centre randomized superiority trial including 100 participants. The inclusion criteria were health-care professionals employed at the department of obstetrics or anesthesia at Rigshospitalet, Copenhagen, who were working on shifts and gave written informed consent. Exclusion criteria were managers with staff responsibilities, and staff who were actively taking part in preparation of the trial. The same obstetric multi-professional training was conducted in the two simulation settings. The experimental group was exposed to training in the ISS setting, and the control group in the OSS setting. The primary outcome is the individual score on a knowledge test. Exploratory outcomes are individual scores on a safety attitudes questionnaire, a stress inventory, salivary cortisol levels, an intrinsic motivation inventory, results from a questionnaire evaluating perceptions of the simulation and suggested changes needed in the

  11. 'In situ simulation' versus 'off site simulation' in obstetric emergencies and their effect on knowledge, safety attitudes, team performance, stress, and motivation: study protocol for a randomized controlled trial.

    PubMed

    Sørensen, Jette Led; Van der Vleuten, Cees; Lindschou, Jane; Gluud, Christian; Østergaard, Doris; LeBlanc, Vicki; Johansen, Marianne; Ekelund, Kim; Albrechtsen, Charlotte Krebs; Pedersen, Berit Woetman; Kjærgaard, Hanne; Weikop, Pia; Ottesen, Bent

    2013-07-17

    Unexpected obstetric emergencies threaten the safety of pregnant women. As emergencies are rare, they are difficult to learn. Therefore, simulation-based medical education (SBME) seems relevant. In non-systematic reviews on SBME, medical simulation has been suggested to be associated with improved learner outcomes. However, many questions on how SBME can be optimized remain unanswered. One unresolved issue is how 'in situ simulation' (ISS) versus 'off site simulation' (OSS) impact learning. ISS means simulation-based training in the actual patient care unit (in other words, the labor room and operating room). OSS means training in facilities away from the actual patient care unit, either at a simulation centre or in hospital rooms that have been set up for this purpose. The objective of this randomized trial is to study the effect of ISS versus OSS on individual learning outcome, safety attitude, motivation, stress, and team performance amongst multi-professional obstetric-anesthesia teams.The trial is a single-centre randomized superiority trial including 100 participants. The inclusion criteria were health-care professionals employed at the department of obstetrics or anesthesia at Rigshospitalet, Copenhagen, who were working on shifts and gave written informed consent. Exclusion criteria were managers with staff responsibilities, and staff who were actively taking part in preparation of the trial. The same obstetric multi-professional training was conducted in the two simulation settings. The experimental group was exposed to training in the ISS setting, and the control group in the OSS setting. The primary outcome is the individual score on a knowledge test. Exploratory outcomes are individual scores on a safety attitudes questionnaire, a stress inventory, salivary cortisol levels, an intrinsic motivation inventory, results from a questionnaire evaluating perceptions of the simulation and suggested changes needed in the organization, a team-based score on video

  12. 116. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (206), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    116. VIEW OF NORTH SIDE OF LANDLINE INSTRUMENTATION ROOM (206), LSB (BLDG. 751), WITH CABINETS ON EAST SIDE OF ROOM FACING WEST. THE ROW OF CABINETS ON EAST SIDE OF ROOM INCLUDES LEFT TO RIGHT: CABLE DISTRIBUTION UNITS, AUTOPILOT CONTROLS, AND POWER DISTRIBUTION UNITS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  13. The Vaccine Safety Datalink: immunization research in health maintenance organizations in the USA.

    PubMed Central

    Chen, R. T.; DeStefano, F.; Davis, R. L.; Jackson, L. A.; Thompson, R. S.; Mullooly, J. P.; Black, S. B.; Shinefield, H. R.; Vadheim, C. M.; Ward, J. I.; Marcy, S. M.

    2000-01-01

    The Vaccine Safety Datalink is a collaborative project involving the National Immunization Program of the Centers for Disease Control and Prevention and several large health maintenance organizations in the USA. The project began in 1990 with the primary purpose of rigorously evaluating concerns about the safety of vaccines. Computerized data on vaccination, medical outcome (e.g. outpatient visits, emergency room visits, hospitalizations, and deaths) and covariates (e.g. birth certificates, census data) are prospectively collected and linked under joint protocol at multiple health maintenance organizations for analysis. Approximately 6 million persons (2% of the population of the USA) are now members of health maintenance organizations participating in the Vaccine Safety Datalink, which has proved to be a valuable resource providing important information on a number of vaccine safety issues. The databases and infrastructure created for the Vaccine Safety Datalink have also provided opportunities to address vaccination coverage, cost-effectiveness and other matters connected with immunization as well as matters outside this field. PMID:10743283

  14. Human factors dimensions in the evolution of increasingly automated control rooms for near-earth satellites

    NASA Technical Reports Server (NTRS)

    Mitchell, C. M.

    1982-01-01

    The NASA-Goddard Space Flight Center is responsible for the control and ground support for all of NASA's unmanned near-earth satellites. Traditionally, each satellite had its own dedicated mission operations room. In the mid-seventies, an integration of some of these dedicated facilities was begun with the primary objective to reduce costs. In this connection, the Multi-Satellite Operations Control Center (MSOCC) was designed. MSOCC represents currently a labor intensive operation. Recently, Goddard has become increasingly aware of human factors and human-machine interface issues. A summary is provided of some of the attempts to apply human factors considerations in the design of command and control environments. Current and future activities with respect to human factors and systems design are discussed, giving attention to the allocation of tasks between human and computer, and the interface for the human-computer dialogue.

  15. Impact of the World Health Organization's Surgical Safety Checklist on safety culture in the operating theatre: a controlled intervention study

    PubMed Central

    Haugen, A. S.; Søfteland, E.; Eide, G. E.; Sevdalis, N.; Vincent, C. A.; Nortvedt, M. W.; Harthug, S.

    2013-01-01

    Background Positive changes in safety culture have been hypothesized to be one of the mechanisms behind the reduction in mortality and morbidity after the introduction of the World Health Organization's Surgical Safety Checklist (SSC). We aimed to study the checklist effects on safety culture perceptions in operating theatre personnel using a prospective controlled intervention design at a single Norwegian university hospital. Methods We conducted a study with pre- and post-intervention surveys using the intervention and control groups. The primary outcome was the effects of the Norwegian version of the SSC on safety culture perceptions. Safety culture was measured using the validated Norwegian version of the Hospital Survey on Patient Safety Culture. Descriptive characteristics of operating theatre personnel and checklist compliance data were also recorded. A mixed linear regression model was used to assess changes in safety culture. Results The response rate was 61% (349/575) at baseline and 51% (292/569) post-intervention. Checklist compliance ranged from 77% to 85%. We found significant positive changes in the checklist intervention group for the culture factors ‘frequency of events reported’ and ‘adequate staffing’ with regression coefficients at −0.25 [95% confidence interval (CI), −0.47 to −0.07] and 0.21 (95% CI, 0.07–0.35), respectively. Overall, the intervention group reported significantly more positive culture scores—including at baseline. Conclusions Implementation of the SSC had rather limited impact on the safety culture within this hospital. PMID:23404986

  16. Locker Room Talk.

    ERIC Educational Resources Information Center

    Fickes, Michael

    1999-01-01

    Examines the trends in college and university sports and recreation center locker rooms as envisioned by a specialist. Features of the modern locker room and the different levels of locker room design are explained. Final comments discuss whether college and university facility managers are inclined to move to high-end locker rooms. (GR)

  17. Interior. Balance room for chemistry laboratory. Storage room for glassware ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Interior. Balance room for chemistry laboratory. Storage room for glassware and reference room with frequently used chemistry and chemical engineering texts. - Thomas A. Edison Laboratories, Building No. 2, Main Street & Lakeside Avenue, West Orange, Essex County, NJ

  18. Room airflow studies using sonic anemometry.

    PubMed

    Wasiolek, P T; Whicker, J J; Gong, H; Rodgers, J C

    1999-06-01

    To ensure prompt response by real-time air monitors to an accidental release of toxic aerosols in a workplace, safety professionals should understand airflow patterns. This understanding can be achieved with validated computational fluid dynamics (CFD) computer simulations, or with experimental techniques, such as measurements with smoke, neutrally buoyant markers, trace gases, or trace aerosol particles. As a supplementary technique to quantify airflows, the use of a state-of-the art, three-dimensional sonic anemometer was explored. This instrument allows for the precise measurements of the air-velocity vector components in the range of a few centimeters per second, which is common in many indoor work environments. Measurements of air velocities and directions at selected locations were made for the purpose of providing data for characterizing fundamental aspects of indoor air movement in two ventilated rooms and for comparison to CFD model predictions. One room was a mockup of a plutonium workroom, and the other was an actual functioning plutonium workroom. In the mockup room, air-velocity vector components were measured at 19 locations at three heights (60, 120 and 180 cm) with average velocities varying from 1.4 cm s-1 to 9.7 cm s-1. There were complex flow patterns observed with turbulence intensities from 39% up to 108%. In the plutonium workroom, measurements were made at the breathing-zone height, recording average velocities ranging from 9.9 cm s-1 to 35.5 cm s-1 with turbulence intensities from 33% to 108%.

  19. Impact of Active Control on Passive Safety Response Characteristics of Sodium-cooled Fast Reactors: I - Theoretical background

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Passerini, Stefano; Ponciroli, Roberto; Vilim, Richard B.

    Here, the interaction of the active control system with passive safety behavior is investigated for sodium-cooled fast reactors. A claim often made of advanced reactors is that they are passively safe against unprotected upset events. In practice, such upset events are not analyzed in the context of the plant control system, but rather the analyses are performed without considering the normally programmed response of the control system (open-loop approach). This represents an oversimplification of the safety case. The issue of passive safety override arises since the control system commands actuators whose motions have safety consequences. Depending on the upset involvingmore » the control system ( operator error, active control system failure, or inadvertent control system override), an actuator does not necessarily go in the same direction as needed for safety. So neglecting to account for control system action during an unprotected upset is nonconservative from a safety standpoint. It is important then, during the design of the plant, to consider the potential for the control system to work against the inherent and safe regulating effects of purposefully engineered temperature feedbacks.« less

  20. Impact of Active Control on Passive Safety Response Characteristics of Sodium-cooled Fast Reactors: I - Theoretical background

    DOE PAGES

    Passerini, Stefano; Ponciroli, Roberto; Vilim, Richard B.

    2017-06-21

    Here, the interaction of the active control system with passive safety behavior is investigated for sodium-cooled fast reactors. A claim often made of advanced reactors is that they are passively safe against unprotected upset events. In practice, such upset events are not analyzed in the context of the plant control system, but rather the analyses are performed without considering the normally programmed response of the control system (open-loop approach). This represents an oversimplification of the safety case. The issue of passive safety override arises since the control system commands actuators whose motions have safety consequences. Depending on the upset involvingmore » the control system ( operator error, active control system failure, or inadvertent control system override), an actuator does not necessarily go in the same direction as needed for safety. So neglecting to account for control system action during an unprotected upset is nonconservative from a safety standpoint. It is important then, during the design of the plant, to consider the potential for the control system to work against the inherent and safe regulating effects of purposefully engineered temperature feedbacks.« less

  1. Room with a View: Ethical Encounters in Room 13

    ERIC Educational Resources Information Center

    Grube, Vicky

    2012-01-01

    In this article, the author describes ethical encounters in Room 13, a schoolroom where children made what they wanted, posed their own questions, and ran an art room like a small business. In Room 13 children had the responsibility to maintain all aspects of the art studio. Specific decisions fell to an annually elected management team, a small…

  2. West elevation, southwest firstfloor room, main block. This room is ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    West elevation, southwest first-floor room, main block. This room is believed to be the one referred to as the "Committee Room" in institutional records. - Lazaretto Quarantine Station, Wanamaker Avenue and East Second Street, Essington, Delaware County, PA

  3. 14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INTERIOR VIEW TO THE EAST OF EQUIPMENT IN ROOM 3, FLOW CONTROL ROOM, BUILDING 3113/3113A. - Nevada Test Site, Test Cell A Facility, Test Cell A Building & Addition, Area 25, Jackass Flats, Road F, Mercury, Nye County, NV

  4. 57. VIEW LOOKING NORTHWEST OF SIGNAL POWER CONDITIONING ROOM LOCATED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. VIEW LOOKING NORTHWEST OF SIGNAL POWER CONDITIONING ROOM LOCATED OVER CONTROL ROOM MEZZANINE. SHOWN WITHIN THE BRICK PARTITIONS ARE SIGNAL VOLTAGE AUTOTRANSFORMERS. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  5. Operating room management and operating room productivity: the case of Germany.

    PubMed

    Berry, Maresi; Berry-Stölzle, Thomas; Schleppers, Alexander

    2008-09-01

    We examine operating room productivity on the example of hospitals in Germany with independent anesthesiology departments. Linked to anesthesiology group literature, we use the ln(Total Surgical Time/Total Anesthesiologists Salary) as a proxy for operating room productivity. We test the association between operating room productivity and different structural, organizational and management characteristics based on survey data from 87 hospitals. Our empirical analysis links improved operating room productivity to greater operating room capacity, appropriate scheduling behavior and management methods to realign interests. From this analysis, the enforcing jurisdiction and avoiding advance over-scheduling appear to be the implementable tools for improving operating room productivity.

  6. Payload Safety: Risk and Characteristic-Based Control of Engineered Nanomaterials

    NASA Astrophysics Data System (ADS)

    Abou, Seraphin Chally; Saad, Maarouf

    2013-09-01

    In the last decade progress has been made to assist organizations that are developing payloads intended for flight on the International Space Station (ISS) and/or Space Shuttle. Collaboration programs for comprehensive risk assessment have been initiated between the U.S. and the European Union to generate requirements and data needed to comply with payloads safety and to perform risk assessment and controls guidance. Yet, substantial research gaps remain, as do challenges in the translation of these research findings to control for exposure to nanoscale material payloads, and the health effects. Since nanomaterial structures are different from traditional molecules, some standard material properties can change at size of 50nm or less. Changes in material properties at this scale challenge our understanding of hazards posed by nanomaterial payloads in the ISS realistic exposure conditions, and our ability to anticipate, evaluate, and control potential health issues, and safety. The research question addressed in this framework is: what kind of descriptors can be developed for nanomaterial payloads risks assessment? Methods proposed incorporate elements of characteristic- based risk an alysis: (1) to enable characterization of anthropogenic nanomaterials which can result in incidental from natural nanoparticles; and (2) to better understand safety attributes in terms of human health impacts from exposure to varying types of engineered nanomaterials.

  7. Critical review of controlled release packaging to improve food safety and quality.

    PubMed

    Chen, Xi; Chen, Mo; Xu, Chenyi; Yam, Kit L

    2018-03-19

    Controlled release packaging (CRP) is an innovative technology that uses the package to release active compounds in a controlled manner to improve safety and quality for a wide range of food products during storage. This paper provides a critical review of the uniqueness, design considerations, and research gaps of CRP, with a focus on the kinetics and mechanism of active compounds releasing from the package. Literature data and practical examples are presented to illustrate how CRP controls what active compounds to release, when and how to release, how much and how fast to release, in order to improve food safety and quality.

  8. 12. VIEW OF OPERATING ROOMRCA COMMUNICATION REC STATION (THIS ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF OPERATING ROOM-RCA COMMUNICATION REC STATION (THIS ROOM WAS ORIGINALLY A MOTOR GENERATOR FACILITY AND SUPPLIED DC POWER TO AN EARLIER GENERATION OF POINT-TO-POINT RECEIVERS ON SECOND FLOOR). VIEW SHOWS TRANSMITTER CONTROL STATION AND AUDIO CONTROL STATION (LEFT, WATKINS-JOHNSON WJ-8718-23. HP RECEIVERS AND KENWOOD R-5000 COMMUNICATIONS RECEIVERS (220 DEGREES). - Marconi Radio Sites, Receiving, Point Reyes Station, Marin County, CA

  9. Effects of revised consultation room design on patient-physician communication.

    PubMed

    Ajiboye, Folaranmi; Dong, Fanglong; Moore, Justin; Kallail, K James; Baughman, Allison

    2015-01-01

    To evaluate the impact of a revised consultation room design on patient-physician interaction in an outpatient setting. The growth of ambulatory medical care makes outpatient facilities the primary point of health care contact for many Americans. However, the outpatient consultation room design remains largely unchanged, despite its increased use and the adoption of technology-mediated information sharing in clinical encounter. A randomized controlled trial used a postvisit questionnaire to assess six domains of interest (satisfaction with the visit and the consultation room, mutual respect, patient trust in the physician, communication quality, people-room interaction, and interpersonal-room interaction) in two different room designs (a traditional room and an experimental room in which a pedestal table had replaced the examination table). Interpersonal-room interaction was enhanced in the experimental consultation room when compared to the traditional consultation room (p = .0038). Participants in the experimental consultation room had better access to the computer screen, increased provider information sharing, and more time engaging providers in conversation about information on the monitor. Changing the layout of a consultation room has the potential to improve interpersonal communication through better information sharing. Clinicians who are interested in maximizing the benefits of their clinical encounter should consider changing the layout of their consultation room, especially the positioning of the computer screen. © The Author(s) 2014.

  10. Evaluating different concentrations of hydrogen peroxide in an automated room disinfection system.

    PubMed

    Murdoch, L E; Bailey, L; Banham, E; Watson, F; Adams, N M T; Chewins, J

    2016-09-01

    A comparative study was made on the efficacy of 5, 10 and 35% weight by weight (w/w) hydrogen peroxide solutions when applied using an automated room disinfection system. Six-log biological indicators of methicillin-resistant Staphylococcus aureus (MRSA) and Geobacillus stearothermophilus were produced on stainless steel coupons and placed within a large, sealed, environmentally controlled enclosure. Five percent hydrogen peroxide was distributed throughout the enclosure using a Bioquell hydrogen peroxide vapour generator (BQ-50) for 40 min and left to reside for a further 200 min. Biological indicators were removed at 10-min intervals throughout the first 120 min of the process. The experiment was repeated for 10 and 35% hydrogen peroxide solutions. Five percent and 10% hydrogen peroxide solutions failed to achieve any reduction of MRSA, but achieved full kill of G. stearothermophilus spores at 70 and 40 min respectively. Thirty-five percent hydrogen peroxide achieved a 6-log reduction of MRSA after 30 min and full kill of G. stearothermophilus at 20 min. The concentration of 5% hydrogen peroxide within the enclosure after the 200-min dwell was measured at 9·0 ppm. This level exceeds the 15-min Short Term Exposure Limit (STEL) for hydrogen peroxide of 2·0 ppm. Users of automated hydrogen peroxide disinfection systems should review system efficacy and room re-entry protocols in light of these results. This research allows hospital infection control teams to consider the impact and risks of using low concentrations of hydrogen peroxide for disinfection within their facilities, and to question automated room disinfection system providers on the efficacy claims they make. The evidence that low concentration hydrogen peroxide solutions do not rapidly, autonomously break down, is in contradiction to the claims made by some hydrogen peroxide equipment providers and raises serious health and safety concerns. Facilities using hydrogen peroxide systems that

  11. Safety in the Weightroom.

    ERIC Educational Resources Information Center

    Fernandez-Balboa, Juan-Miguel

    1993-01-01

    Secondary level physical educators must be sure to instruct their weight lifters in proper spotting and lifting procedures, because weight training carries a high risk of injury. The article explains how to check the equipment, spot properly for specific exercises, and take general safety precautions in the weight room. (SM)

  12. Infection control in the operating room: is it more than a clean dish?

    PubMed

    Loftus, Randy W

    2016-04-01

    Healthcare-associated infections (HCAIs) are driven by a complex interplay between host defenses, pathogen traits, and pathogen transmission. A better understanding of each of these factors is required to extend infection control beyond antibiotic therapy to improvements in basic preventive measures that can achieve sustained HCAI reductions. The purpose of this article is to review recent advancements in our understanding of these issues for the operating room environment. The importance and implications of intraoperative bacterial transmission have been solidified, and hyper transmissible, virulent, and antibiotic resistant bacterial strains have been characterized. As a result, a best practice for improved intraoperative infection control has been delineated. Little advancement has been made in our understanding of the efficacy of higher inspired oxygen concentrations, improved postoperative glucose control, perioperative normothermia, and prophylactic antibiotic selection, timing, and dose for HCAI prevention. Recent work has led to the development of evidence-based hand hygiene, environmental cleaning, patient decolonization, and intravascular catheter design and handling improvement strategies. Evidence suggests that a best practice for postoperative infection control is a multimodal program that utilizes these interventions to target patient, provider, and environmental reservoirs in parallel. The development of novel diagnostic tools for targeted attenuation of hyper virulent, transmissible and resistant strains/strain characteristics is indicated to improve patient decolonization efforts.

  13. 7. INTERIOR OF SOUTH MAIN BUILDING ROOM AND OPEN DOOR ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. INTERIOR OF SOUTH MAIN BUILDING ROOM AND OPEN DOOR TO SHED ADDITION, OPEN DOOR TO NORTH MAIN BUILDING ROOM, AND CLOSED DOOR TO BATHROOM. VIEW TO NORTHWEST. - Bishop Creek Hydroelectric System, Control Station, Hydrographer's Office, Bishop Creek, Bishop, Inyo County, CA

  14. Clean Room in the Zero Gravity Research Facility

    NASA Image and Video Library

    1968-07-21

    A technician prepares a test sample in the Zero Gravity Research Facility clean room at the National Aeronautics and Space Administration (NASA) Lewis Research Center. The Zero Gravity Research Facility contained a drop tower which provided five seconds of microgravity during freefall in its 450-foot deep vacuum chamber. The facility has been used for a variety of studies relating to the behavior of fluids and flames in microgravity. During normal operations, a cylindrical 3-foot diameter and 11-foot long vehicle was used to house the experiments, instrumentation, and high speed cameras. The 4.5-foot long and 1.5-foot wide rectangular vehicle, seen in this photograph, was used less frequently. A 3-foot diameter orb was used for the special ten-second drops in which the package was pneumatically shot to the top of the tower then dropped. The facility also contained a control room, shop offices, tool and equipment rooms, and this clean room. The 242.5-foot long and 19.5-foot wide clean room was equipped with specialized cleaning equipment. In the 1960s the room was rated as a class 10,000 clean room, but I was capable of meeting the class 100 requirements. The room included a fume hood, ultrasonic cleaner, and a laminar flow station which operated as a class 100 environment. The environment in the clean room was maintained at 71° F and a relative humidity of 45- percent.

  15. Principles and safety measures of electrosurgery in laparoscopy.

    PubMed

    Alkatout, Ibrahim; Schollmeyer, Thoralf; Hawaldar, Nusrat A; Sharma, Nidhi; Mettler, Liselotte

    2012-01-01

    Electrosurgical units are the most common type of electrical equipment in the operating room. A basic understanding of electricity is needed to safely apply electrosurgical technology for patient care. We reviewed the literature concerning the essential biophysics, the incidence of electrosurgical injuries, and the possible mechanisms for injury. Various safety guidelines pertaining to avoidance of injuries were also reviewed. Electrothermal injury may result from direct application, insulation failure, direct coupling, capacitive coupling, and so forth. A thorough knowledge of the fundamentals of electrosurgery by the entire team in the operating room is essential for patient safety and for recognizing potential complications. Newer hemostatic technologies can be used to decrease the incidence of complications.

  16. Principles and Safety Measures of Electrosurgery in Laparoscopy

    PubMed Central

    Alkatout, Ibrahim; Schollmeyer, Thoralf; Hawaldar, Nusrat A.; Sharma, Nidhi

    2012-01-01

    Background: Electrosurgical units are the most common type of electrical equipment in the operating room. A basic understanding of electricity is needed to safely apply electrosurgical technology for patient care. Methods: We reviewed the literature concerning the essential biophysics, the incidence of electrosurgical injuries, and the possible mechanisms for injury. Various safety guidelines pertaining to avoidance of injuries were also reviewed. Results: Electrothermal injury may result from direct application, insulation failure, direct coupling, capacitive coupling, and so forth. Conclusion: A thorough knowledge of the fundamentals of electrosurgery by the entire team in the operating room is essential for patient safety and for recognizing potential complications. Newer hemostatic technologies can be used to decrease the incidence of complications. PMID:22906341

  17. Operating room myths: what is the evidence for common practices.

    PubMed

    Pada, Surinder; Perl, Trish M

    2015-08-01

    In order to ensure patient safety and prevent surgical site infections (SSIs), operating theaters/rooms have evolved into complex, highly technical environments. Prevention of healthcare-associated infections, and strategies to limit patient harm, have gained momentum over the last decade. This article aims to examine and dispute some commonly held beliefs with specific reference to: laminar airflow, noise and operating theater door openings and how these impact SSI. Laminar airflow may not be necessary for prosthetic implant surgery. Some recent data suggest that there may be patient harm. With the development of better surgical techniques and perioperative care, such costly systems may not be needed. Operating rooms with a high number of door openings have also been shown to experience higher SSI rates, as have operating rooms with high noise levels. These may serve as surrogate markers for operating room discipline. Initiatives which target these areas may be worth considering when devising strategies to reduce SSIs. Improved surveillance systems for SSIs are needed and should include operating theater airflow type. This will allow further analysis of the effect of laminar air flow on SSIs and provide evidence for a decisive recommendation. Cultivating a culture of good operating theater discipline may also reduce SSIs.

  18. Temperature-controlled airflow ventilation in operating rooms compared with laminar airflow and turbulent mixed airflow.

    PubMed

    Alsved, M; Civilis, A; Ekolind, P; Tammelin, A; Andersson, A Erichsen; Jakobsson, J; Svensson, T; Ramstorp, M; Sadrizadeh, S; Larsson, P-A; Bohgard, M; Šantl-Temkiv, T; Löndahl, J

    2018-02-01

    To evaluate three types of ventilation systems for operating rooms with respect to air cleanliness [in colony-forming units (cfu/m 3 )], energy consumption and comfort of working environment (noise and draught) as reported by surgical team members. Two commonly used ventilation systems, vertical laminar airflow (LAF) and turbulent mixed airflow (TMA), were compared with a newly developed ventilation technique, temperature-controlled airflow (T c AF). The cfu concentrations were measured at three locations in an operating room during 45 orthopaedic procedures: close to the wound (<40cm), at the instrument table and peripherally in the room. The operating team evaluated the comfort of the working environment by answering a questionnaire. LAF and T c AF, but not TMA, resulted in less than 10cfu/m 3 at all measurement locations in the room during surgery. Median values of cfu/m 3 close to the wound (250 samples) were 0 for LAF, 1 for T c AF and 10 for TMA. Peripherally in the room, the cfu concentrations were lowest for T c AF. The cfu concentrations did not scale proportionally with airflow rates. Compared with LAF, the power consumption of T c AF was 28% lower and there was significantly less disturbance from noise and draught. T c AF and LAF remove bacteria more efficiently from the air than TMA, especially close to the wound and at the instrument table. Like LAF, the new T c AF ventilation system maintained very low levels of cfu in the air, but T c AF used substantially less energy and provided a more comfortable working environment than LAF. This enables energy savings with preserved air quality. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  19. Addressing prehospital patient safety using the science of injury prevention and control.

    PubMed

    Meisel, Zachary F; Hargarten, Stephen; Vernick, Jon

    2008-01-01

    There is inadequate information about the scope and character of adverse events in prehospital care. However, there is ample evidence to suggest that prehospital patient safety hazards are often unique and underrecognized. We first summarize what is currently understood about prehospital patient safety and identify the specific aspects of emergency medical services (EMS) care that may make conventional approaches to the evaluation and improvement of patient safety more difficult. Next we introduce the concept of using injury prevention and control science to analyze prehospital adverse events and to help develop EMS patient safety solutions. Injury prevention and control is a proven public health approach for the study and reduction of both intentional and unintentional injuries. It includes the use of a Haddon phase-factor matrix to identify possible interventions, especially environmental modifications that provide automatic protection. We demonstrate how this method can be used as a complementary approach in efforts to prevent injuries caused by prehospital adverse medical events.

  20. Safety Verification of a Fault Tolerant Reconfigurable Autonomous Goal-Based Robotic Control System

    NASA Technical Reports Server (NTRS)

    Braman, Julia M. B.; Murray, Richard M; Wagner, David A.

    2007-01-01

    Fault tolerance and safety verification of control systems are essential for the success of autonomous robotic systems. A control architecture called Mission Data System (MDS), developed at the Jet Propulsion Laboratory, takes a goal-based control approach. In this paper, a method for converting goal network control programs into linear hybrid systems is developed. The linear hybrid system can then be verified for safety in the presence of failures using existing symbolic model checkers. An example task is simulated in MDS and successfully verified using HyTech, a symbolic model checking software for linear hybrid systems.

  1. Prediction based active ramp metering control strategy with mobility and safety assessment

    NASA Astrophysics Data System (ADS)

    Fang, Jie; Tu, Lili

    2018-04-01

    Ramp metering is one of the most direct and efficient motorway traffic flow management measures so as to improve traffic conditions. However, owing to short of traffic conditions prediction, in earlier studies, the impact on traffic flow dynamics of the applied RM control was not quantitatively evaluated. In this study, a RM control algorithm adopting Model Predictive Control (MPC) framework to predict and assess future traffic conditions, which taking both the current traffic conditions and the RM-controlled future traffic states into consideration, was presented. The designed RM control algorithm targets at optimizing the network mobility and safety performance. The designed algorithm is evaluated in a field-data-based simulation. Through comparing the presented algorithm controlled scenario with the uncontrolled scenario, it was proved that the proposed RM control algorithm can effectively relieve the congestion of traffic network with no significant compromises in safety aspect.

  2. Statistical process control as a tool for controlling operating room performance: retrospective analysis and benchmarking.

    PubMed

    Chen, Tsung-Tai; Chang, Yun-Jau; Ku, Shei-Ling; Chung, Kuo-Piao

    2010-10-01

    There is much research using statistical process control (SPC) to monitor surgical performance, including comparisons among groups to detect small process shifts, but few of these studies have included a stabilization process. This study aimed to analyse the performance of surgeons in operating room (OR) and set a benchmark by SPC after stabilized process. The OR profile of 499 patients who underwent laparoscopic cholecystectomy performed by 16 surgeons at a tertiary hospital in Taiwan during 2005 and 2006 were recorded. SPC was applied to analyse operative and non-operative times using the following five steps: first, the times were divided into two segments; second, they were normalized; third, they were evaluated as individual processes; fourth, the ARL(0) was calculated;, and fifth, the different groups (surgeons) were compared. Outliers were excluded to ensure stability for each group and to facilitate inter-group comparison. The results showed that in the stabilized process, only one surgeon exhibited a significantly shorter total process time (including operative time and non-operative time). In this study, we use five steps to demonstrate how to control surgical and non-surgical time in phase I. There are some measures that can be taken to prevent skew and instability in the process. Also, using SPC, one surgeon can be shown to be a real benchmark. © 2010 Blackwell Publishing Ltd.

  3. The influence of environmental conditions on safety management in hospitals: a qualitative study.

    PubMed

    Alingh, Carien W; van Wijngaarden, Jeroen D H; Huijsman, Robbert; Paauwe, Jaap

    2018-05-02

    Hospitals are confronted with increasing safety demands from a diverse set of stakeholders, including governmental organisations, professional associations, health insurance companies, patient associations and the media. However, little is known about the effects of these institutional and competitive pressures on hospital safety management. Previous research has shown that organisations generally shape their safety management approach along the lines of control- or commitment-based management. Using a heuristic framework, based on the contextually-based human resource theory, we analysed how environmental pressures affect the safety management approach used by hospitals. A qualitative study was conducted into hospital care in the Netherlands. Five hospitals were selected for participation, based on organisational characteristics as well as variation in their reputation for patient safety. We interviewed hospital managers and staff with a central role in safety management. A total of 43 semi-structured interviews were conducted with 48 respondents. The heuristic framework was used as an initial model for analysing the data, though new codes emerged from the data as well. In order to ensure safe care delivery, institutional and competitive stakeholders often impose detailed safety requirements, strong forces for compliance and growing demands for accountability. As a consequence, hospitals experience a decrease in the room to manoeuvre. Hence, organisations increasingly choose a control-based management approach to make sure that safety demands are met. In contrast, in case of more abstract safety demands and an organisational culture which favours patient safety, hospitals generally experience more leeway. This often results in a stronger focus on commitment-based management. Institutional and competitive conditions as well as strategic choices that hospitals make have resulted in various combinations of control- and commitment-based safety management. A balanced

  4. Mounting evidence favoring single-family room neonatal intensive care.

    PubMed

    Stevens, D; Thompson, P; Helseth, C; Pottala, J

    2015-01-01

    Controversy regarding the optimal design for neonatal intensive care has existed for more than 20 years. Recent evidence confirms that in comparison with the traditional open-bay design, the single-room facility provides for improved control of excessive noise and light, improved staff and parental satisfaction with care and equal, or possibly reduced, cost of care. Single-room care was not associated with any increase in adverse outcomes. To optimize long term developmental outcomes, single-room care must be augmented with appropriate developmental therapy and programs to actively support parental involvement.

  5. 123. UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751). PUMP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    123. UMBILICAL MAST PUMP ROOM (209), LSB (BLDG. 751). PUMP ON LEFT; HYDRAULIC CONTROL PANEL FOR UMBILICAL MAST AND TRENCH DOORS IN CENTER OF ROOM, FACING WEST. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  6. Vibration and Noise Control. Module SH-33. Safety and Health.

    ERIC Educational Resources Information Center

    Center for Occupational Research and Development, Inc., Waco, TX.

    This student module on vibration and noise control is one of 50 modules concerned with job safety and health. Following the introduction, nine objectives (each keyed to a page in the text) the student is expected to accomplish are listed (e.g., Compare four strategies for vibration control). Then each objective is taught in detail, sometimes…

  7. 104. ARAIII. Interior view of room 110 in ARA607 used ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    104. ARA-III. Interior view of room 110 in ARA-607 used as data acquisition control room. Camera facing northeast. Ineel photo no. 81-103. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  8. Perceived parental care and control among Israeli female adolescents presenting to emergency rooms after self-poisoning.

    PubMed

    Diamond, Gary M; Didner, Hila; Waniel, Ariela; Priel, Beatriz; Asherov, Jack; Arbel, Shosh

    2005-01-01

    Levels of perceived parental care and control among 24 female Israeli adolescents presenting at emergency rooms after a self-poisoning act of low lethality were compared to those found among 23 non-self-harming, community controls. Adolescents' perceived levels of parental care and control were measured via both adolescents' self-report and independent objective ratings of adolescents' unconstrained descriptions of their parents. Adolescents also completed a standardized psychological symptom checklist. Data from both measurement perspectives indicated that adolescents evidencing self-poisoning behavior perceived their mothers as less caring and more controlling--a parenting style characterized as "affectionless control"--than did the comparison group. Independent ratings of adolescents' descriptions of their parents suggested that those exhibiting self-poisoning also perceived their fathers as less caring. These effects were not moderated by level of psychological symptoms. The findings are consistent with those from previous research showing an association between perceived parental care and control and various self-harming behaviors among adolescents, and highlight the need for research on the potential clinical utility of employing family-based, attachment-promoting psychosocial interventions with this population.

  9. Cost comparison and safety of emergency department conscious sedation for the removal of ear foreign bodies.

    PubMed

    Olson, Michael D; Saw, Jessica; Visscher, Sue L; Balakrishnan, Karthik

    2018-07-01

    The purpose of this study is to investigate the relative cost and safety of ear foreign body (FB) removal via conscious sedation in the emergency department. A retrospective review of patients presenting from 2000 to 2015 to the emergency department at Mayo Clinic, Rochester, Minnesota was performed. 63 patients requiring sedation for ear foreign body removal were identified. Descriptive data, safety data, and costs were obtained for the study. There were no appreciable differences in patient safety outcomes and otologic outcomes in patients who received sedation in the emergency department or anesthesia in the operating room for FB removal. Cost analysis demonstrated increased cost associated with operating room utilization verses conscious sedation in the emergency department, with the greatest cost increase being in patients evaluated first in the emergency department and then sent to the operating room. Ear foreign body removal in the emergency department is shows a similar safety profile to removal in the operating room, but at a markedly lower cost. Emergency department conscious sedation should be considered a viable option in appropriately selected patients with this common problem given these results. Copyright © 2018. Published by Elsevier B.V.

  10. SAFETY AND SECURITY BUILDING, TRA614. FLOOR, ROOF, AND FOUNDATION PLANS. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    SAFETY AND SECURITY BUILDING, TRA-614. FLOOR, ROOF, AND FOUNDATION PLANS. ROOM FUNCTIONS. DOOR AND ROOM FINISH SCHEDULE. BLAW-KNOX 3150-814-1, 3/1950. INL INDEX NO. 531-0614-00-098-100702, REV. 6. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  11. The implementation of physical safety system in bunker of the electron beam accelerator

    NASA Astrophysics Data System (ADS)

    Ahmad, M. A.; Hashim, S. A.; Ahmad, A.; Leo, K. W.; Chulan, R. M.; Dalim, Y.; Baijan, A. H.; Zain, M. F.; Ros, R. C.

    2017-01-01

    This paper describes the implementation of physical safety system for the new low energy electron beam (EB) accelerator installed at Block 43T Nuclear Malaysia. The low energy EB is a locally designed and developed with a target energy of 300 keV. The issues on radiation protection have been addressed by the installation of radiation shielding in the form of a bunker and installation radiation monitors. Additional precaution is needed to ensure that personnel are not exposed to radiation and other physical hazards. Unintentional access to the radiation room can cause serious hazard and hence safety features must be installed to prevent such events. In this work we design and built a control and monitoring system for the shielding door. The system provides signals to the EB control panel to allow or prevent operation. The design includes limit switches, key-activated switches and emergency stop button and surveillance camera. Entry procedure is also developed as written record and for information purposes. As a result, through this safety implementation human error will be prevented, increase alertness during operation and minimizing unnecessary radiation exposure.

  12. Modern traffic control devices to improve safety at rural intersections.

    DOT National Transportation Integrated Search

    2011-12-01

    "Engineers with the Texas Department of Transportation (TxDOT) frequently make changes to traffic control devices : (TCDs) to improve intersection safety. To use available funds judiciously, engineers make incremental changes in : order to select the...

  13. Rooming-in Reduces Salivary Cortisol Level of Newborn

    PubMed Central

    De Bernardo, Giuseppe; Riccitelli, Marina; Giordano, Maurizio; Sordino, Desiree; Longini, Mariangela

    2018-01-01

    Background Rooming-in practice improves breastfeeding and reduces newborn stress reactivity. When this modality is not available, partial rooming-in after birth can be considered. Salivary cortisol levels (SCLs) are considered reliable biomarkers to indicate stress. Objective To test the hypothesis that rooming-in duration impacts neonatal stress response in hospitalized newborns. Design/methods Forty term newborns, enrolled in the Neonatology and Obstetrics Nursing, C.G. Ruesch, Naples, Italy, were divided, according to the mother's choice, into the study (SG; n = 20) and control (CG; n = 20) groups if they received full (24 hs) or partial (14 hs) rooming-in care, respectively. Saliva samples were collected from all babies between 7:00 a.m. and 8:00 a.m. of the 3rd day of life by using oral swab. Salivary cortisol levels were measured using an enzyme immunoassay kit (Salimetrics LLC, PA, USA). Results A statistically significant difference in the SCLs between SG and CG was found (median: 258 ng/dl versus 488.5 ng/dl; p = 0.048). Conclusions Data support the practice of full rooming-in care compared with partial rooming-in. The rooming-in duration clearly reduces SCLs and likely neonatal stress. These lower SCLs may have long-term positive effects reducing the risk of metabolic syndrome, high blood pressure, and cognitive and behavioural changes. PMID:29706798

  14. Impact of imaging room environment: staff job stress and satisfaction, patient satisfaction, and willingness to recommend.

    PubMed

    Quan, Xiaobo; Joseph, Anjali; Ensign, Janet C

    2012-01-01

    The built environment significantly affects the healthcare experiences of patients and staff. Healthcare administrators and building designers face the opportunity and challenge of improving healthcare experience and satisfaction through better environmental design. The purpose of the study was to evaluate how a novel environmental intervention for imaging rooms, which integrated multiple elements of healing environments including positive distractions and personal control over environment, affects the perceptions and satisfactions of its primary users-patients and staff. Anonymous questionnaire surveys were conducted to compare patient and staff perceptions of the physical environment, satisfaction, and stress in two types of imaging rooms: imaging rooms with the intervention installed (intervention rooms) and traditionally designed rooms without the intervention (comparison rooms). Imaging technologists and patients perceived the intervention rooms to be significantly more pleasant-looking. Patients in the intervention rooms reported significantly higher levels of environmental control and were significantly more willing to recommend the intervention rooms to others. The environmental intervention was effective in improving certain aspects of the imaging environment: pleasantness and environmental control. Further improvement of the imaging environment is needed to address problematic areas such as noise.

  15. 132. WEST SIDE OF MECHANICAL AND ELECTRICAL ROOM (210), LSB ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    132. WEST SIDE OF MECHANICAL AND ELECTRICAL ROOM (210), LSB (BLDG. 751), QUALITY CONTROL BOARD ON LEFT. SOUTH SIDE OF TRANSFORMER ROOM (212) ON RIGHT SIDE OF PHOTOGRAPH, THROUGH OPEN DOORS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  16. Viewing behaviour of spider phobics and non-phobics in the presence of threat and safety stimuli.

    PubMed

    Lange, W G T; Tierney, K J; Reinhardt-Rutland, A H; Vivekananda-Schmidt, P

    2004-09-01

    To determine whether spider phobics and spider non-phobics differ in attending to threat and safety stimuli in close proximity, or spatially separated. A sample group of 16 spider-phobic and 16 spider-non-phobic volunteers were drawn from a student population on the basis of their scores on Watts and Sharrock's Spider Phobia Questionnaire. Attention was assessed by way of participants' viewing behaviour using an ASL 501 head-mounted eye-tracking system. In a control condition, participants viewed a neutral stimulus (a TV video) in the absence of the threat stimulus. In two experimental conditions, the threat stimulus (a live Chilean rose tarantula) was introduced (a) immediately beside the safety stimulus (the only exit of the experimental room), or (b) away from the safety stimulus. In the experimental conditions, phobics reduced their viewing of the TV and increased their viewing of the tarantula and of the exit; the biggest changes occurred when tarantula and exit were together. Phobics also made more eye motions across the experimental room. Our results are consistent with previous research employing reaction time to a neutral stimulus as dependent measure. In addition, our results suggest that phobics scan the environment as part of safety behaviour. We suggest that exposure treatments to reduce spider phobia may be facilitated by encouraging patients to stop environmental scanning. Copyright 2004 The British Psychological Society

  17. Information system equality for food security--implementation of the food safety control system in Taiwan.

    PubMed

    Chen, Shaun C; Hsu, Guoo-Shyng Wang; Chiu, Chihwei P

    2009-01-01

    Food security plays a central role in governing agricultural policies in Taiwan. In addition to overuse or the illegal use of pesticide, meat leanness promoters, animal drugs and melamine in the food supply; as well as foodborne illness draws the greatest public concern due to incidents that occur every year in Taiwan. The present report demonstrates the implementation of a food safety control system in Taiwan. In order to control foodborne outbreaks effectively, the central government of the Department of Health of Taiwan launched the food safety control system which includes both the good hygienic practice (GHP) and the HACCP plan, in the last decade. From 1998 to the present, 302 food affiliations that implemented the system have been validated and accredited by a well-established audit system. The implementation of a food safety control system in compliance with international standards is of crucial importance to ensure complete safety and the high quality of foods, not only for domestic markets, but also for international trade.

  18. The Safety of Older Pedestrians at Signal-Controlled Crossings.

    ERIC Educational Resources Information Center

    Harrell, W. Andrew

    1996-01-01

    Observes the extent to which pedestrians checked for oncoming traffic before crossing signal-controlled intersections on busy city streets. Pedestrians over the age of 50 were the most cautious, especially under dangerous traffic conditions. Older pedestrians were least likely to use other pedestrians as "guides" to safety, instead…

  19. Stochastic targeted (STAR) glycemic control: design, safety, and performance.

    PubMed

    Evans, Alicia; Le Compte, Aaron; Tan, Chia-Siong; Ward, Logan; Steel, James; Pretty, Christopher G; Penning, Sophie; Suhaimi, Fatanah; Shaw, Geoffrey M; Desaive, Thomas; Chase, J Geoffrey

    2012-01-01

    Tight glycemic control (TGC) has shown benefits but has been difficult to achieve consistently. STAR (Stochastic TARgeted) is a flexible, model-based TGC approach that directly accounts for intra- and interpatient variability with a stochastically derived maximum 5% risk of blood glucose (BG) below 72 mg/dl. This research assesses the safety, efficacy, and clinical burden of a STAR TGC controller modulating both insulin and nutrition inputs in virtual and clinical pilot trials. Clinically validated virtual trials using data from 370 patients in the SPRINT (Specialized Relative Insulin and Nutrition Titration) study were used to design the STAR protocol and test its safety, performance, and required clinical effort prior to clinical pilot trials. Insulin and nutrition interventions were given every 1-3 h as chosen by the nurse to allow them to manage workload. Interventions were designed to maximize the overlap of the model-predicted (5-95(th) percentile) range of BG outcomes with the 72-117 mg/dl band and thus provide a maximum 5% risk of BG <72 mg/dl. Interventions were calculated using clinically validated computer models of human metabolism and its variability in critical illness. Carbohydrate intake (all sources) was selected to maximize intake up to 100% of the American College of Chest Physicians/Society of Critical Care Medicine (ACCP/SCCM) goal (25 kg/kcal/h). Insulin doses were limited (8 U/h maximum), with limited increases based on current rate (0.5-2.0 U/h). Initial clinical pilot trials involved 3 patients covering ~450 h. Approval was granted by the Upper South A Regional Ethics Committee. Virtual trials indicate that STAR provides similar glycemic control performance to SPRINT with 2-3 h (maximum) measurement intervals. Time in the 72-126 mg/dl and 72-145 mg/dl bands was equivalent for all controllers, indicating that glycemic outcome differences between protocols were only shifted in this range. Safety from hypoglycemia was improved. Importantly

  20. Evaluation of a visual layering methodology for colour coding control room displays.

    PubMed

    Van Laar, Darren; Deshe, Ofer

    2002-07-01

    Eighteen people participated in an experiment in which they were asked to search for targets on control room like displays which had been produced using three different coding methods. The monochrome coding method displayed the information in black and white only, the maximally discriminable method contained colours chosen for their high perceptual discriminability, the visual layers method contained colours developed from psychological and cartographic principles which grouped information into a perceptual hierarchy. The visual layers method produced significantly faster search times than the other two coding methods which did not differ significantly from each other. Search time also differed significantly for presentation order and for the method x order interaction. There was no significant difference between the methods in the number of errors made. Participants clearly preferred the visual layers coding method. Proposals are made for the design of experiments to further test and develop the visual layers colour coding methodology.