Sample records for safety project management

  1. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  2. Relational approach in managing construction project safety: a social capital perspective.

    PubMed

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  4. Bridging the Divide between Safety and Risk Management for your Project or Program

    NASA Technical Reports Server (NTRS)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  5. Systemic safety project selection tool.

    DOT National Transportation Integrated Search

    2013-07-01

    "The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...

  6. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    DOT National Transportation Integrated Search

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  7. The Safety project: Sentinel-1 for Civil Protection geohazars management

    NASA Astrophysics Data System (ADS)

    Monserrat, Oriol; Herrera, Gerardo; Bianchini, Silvia; González-Alonso, Elena; Onori, Roberta; Reichenbach, Paola; Carralero, Innocente P.; Barra, Anna; María Mateos, Rosa; Solari, Lorenzo; Ligüérzana, Sergio; Pagliara, Paola; Ardizzone, Francesca; Sarro, Roberto; Crosetto, Michele; Béjar-Pizarro, Marta; Moretti, Sandro; Lopez, Carmen; Garcia-Cañada, Laura; Benito-Saz, María Á.

    2017-04-01

    This work is aimed at presenting the ongoing project SAFETY (Sentinel for Geohazards regional monitoring and forecasting). The use of Differential SAR Interferometry (DInSAR) in Natural Risks management is becoming more and more exploitable thanks to the experienced growth of the techniques. On one hand, since the DInSAR technique was proposed for the first time (1989) a wide number of data processing, analysis tools and methods have been developed, on the other hand the satellite data availability has increased and provides sensors with different characteristics of sensitivity and spatial and temporal resolutions. Nowadays, DInSAR allows to have a systematic overview about the spatio-temporal activity of a natural deformation phenomena, which is an important information for the risk management in terms of prevention, emergency response and post-emergency intervention. Specifically, Sentinel-1 (A and B) satellites data show two favourable characteristics: the wide covered area and the short revisit time (6 days). The last one, if compared with the other C band available sensors, results in a reduced temporal decorrelation, particularly in non-urbanized areas, in more robust processing results (due to the higher number of images) and in an higher temporal sampling i.e. a better monitoring and activity characterization. In this context, the European project SAFETY is focused on developing tools and implementing a methodology in order to better exploit Sentinel-1 data in the Civil Protection activities of natural risks prevention. The project is aimed at providing Civil Protection Authorities (CPA) with the capability of periodically evaluating and assessing the potential impact of geohazards (volcanic activity, earthquakes, landslides and subsidence) on urban areas. The first results over the two test-areas in Spain and Italy (respectively Canary Islands and Volterra Municipality) will be presented.

  8. United States Coast Guard Configuration Management Plan (CMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...

  9. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  10. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    PubMed

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  11. NYC CV Pilot Deployment : Safety Management Plan : New York City.

    DOT National Transportation Integrated Search

    2016-04-22

    This safety management plan identifies preliminary safety hazards associated with the New York City Connected Vehicle Pilot Deployment project. Each of the hazards is rated, and a plan for managing the risks through detailed design and deployment is ...

  12. Advanced spacecraft fire safety: Proposed projects and program plan

    NASA Technical Reports Server (NTRS)

    Youngblood, Wallace W.; Vedha-Nayagam, M.

    1989-01-01

    A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

  13. A safety management system for an offshore Azerbaijan Caspian Sea Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brasic, M.F.; Barber, S.W.; Hill, A.S.

    1996-11-01

    This presentation will describe the Safety Management System that Azerbaijan International Operating Company (AIOC) has structured to assure that Company activities are performed in a manner that protects the public, the environment, contractors and AIOC employees. The Azerbaijan International Oil Company is a consortium of oil companies that includes Socar, the state oil company of Azerbaijan, a number of major westem oil companies, and companies from Russia, Turkey and Saudi Arabia. The Consortium was formed to develop and produce a group of large oil fields in the Caspian Sea. The Management of AIOC, in starting a new operation in Azerbaijan,more » recognized the need for a formal HSE management system to ensure that their HSE objectives for AIOC activities were met. As a consortium of different partners working together in a unique operation, no individual partner company HSE Management system was appropriate. Accordingly AIOC has utilized the E & P Forum {open_quotes}Guidelines for the Development and Application of Health Safety and Environmental Management Systems{close_quotes} as the framework document for the development of the new AIOC system. Consistent with this guideline, AIOC has developed 19 specific HSE Management System Expectations for implementing its HSE policy and objectives. The objective is to establish and continue to maintain operational integrity in all AIOC activities and site operations. An important feature is the use of structured Safety Cases for the design engineering activity. The basis for the Safety Cases is API RP 75 and 14 J for offshore facilities and API RP 750 for onshore facilities both complimented by {open_quotes}Best International Oilfield Practice{close_quotes}. When viewed overall, this approach provides a fully integrated system of HSE management from design into operation.« less

  14. National Ignition Facility Construction Safety Management Review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warner, B.E.

    2000-02-01

    An accident occurred at the NIF construction site on January 13, 2000, in which a worker sustained a serious injury when a 42-inch-diameter duct fell during installation. Following the accident, NIF Project Management chartered two review teams: (1) an Incident Analysis Team to independently assess the direct and root causes of the accident, and (2) a Management Review Team to review the roles and responsibilities of the line, support, and construction management organizations involved. This report provides a discussion of the information gathered by the Management Review Team and provides a list of observations and recommendations based on an analysismore » of the information. The Management Review Team includes senior managers who represent several Directorates within LLNL and DOE OAK: Dick Billia representing Engineering; Dave Leary representing Business Services and Public Affairs; Jim Jackson representing Hazards Control; Chuck Taylor representing DOE OAK; Arnie Clobes representing the ICF/NIF Program; and Jon Yatabe and Bruce Warner (Chairperson) representing the NIF Project. The attached letter from the NIF Project Manager, Ed Moses, to the Management Review Team contains the team's Charter. The team was asked to evaluate the effectiveness of the line management and its supporting safety functions in managing safety during NIF construction. The evaluation was to include the current conventional facility construction, which is 85% complete, and upcoming activities such as Beampath Infrastructure System installation, which will begin in the next six months and which represents a significant amount of work over the next two to three years. The remainder of this document describes the Management Review Team's review process (Section 2), its observations gathered during the review (Section 3), and its recommendations to the NIF Project Manager based on those observations (Section 4).« less

  15. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    PubMed

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  16. Road Infrastructure Safety Management in Poland

    NASA Astrophysics Data System (ADS)

    Budzynski, Marcin; Jamroz, Kazimierz; Kustra, Wojciech; Michalski, Lech; Gaca, Stanislaw

    2017-10-01

    The objective of road safety infrastructure management is to ensure that when roads are planned, designed, built and used road risks can be identified, assessed and mitigated. Road transport safety is significantly less developed than that of rail, water and air transport. The average individual risk of being a fatality in relation to the distance covered is thirty times higher in road transport that in the other modes. This is mainly because the different modes have a different approach to safety management and to the use of risk management methods and tools. In recent years Poland has had one of the European Union’s highest road death numbers. In 2016 there were 3026 fatalities on Polish roads with 40,766 injuries. Protecting road users from the risk of injury and death should be given top priority. While Poland’s national and regional road safety programmes address this problem and are instrumental in systematically reducing the number of casualties, the effects are far from the expectations. Modern approaches to safety focus on three integrated elements: infrastructure measures, safety management and safety culture. Due to its complexity, the process of road safety management requires modern tools to help with identifying road user risks, assess and evaluate the safety of road infrastructure and select effective measures to improve road safety. One possible tool for tackling this problem is the risk-based method for road infrastructure safety management. European Union Directive 2008/96/EC regulates and proposes a list of tools for managing road infrastructure safety. Road safety tools look at two criteria: the life cycle of a road structure and the process of risk management. Risk can be minimized through the application of the proposed interventions during design process as reasonable. The proposed methods of risk management bring together two stages: risk assessment and risk response occurring within the analyzed road structure (road network, road

  17. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  18. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  19. [Design, implementation and evaluation of a management model of patient safety in hospitals in Catalonia, Spain].

    PubMed

    Saura, Rosa Maria; Moreno, Pilar; Vallejo, Paula; Oliva, Glòria; Alava, Fernando; Esquerra, Miquel; Davins, Josep; Vallès, Roser; Bañeres, Joaquim

    2014-07-01

    Since its inception in 2006, the Alliance for Patient Safety in Catalonia has played a major role in promoting and shaping a series of projects related to the strategy of the Ministry of Health, Social Services and Equality, for improving patient safety. One such project was the creation of functional units or committees of safety in hospitals in order to facilitate the management of patient safety. The strategy has been implemented in hospitals in Catalonia which were selected based on criteria of representativeness. The intervention was based on two lines of action, one to develop the model framework and the other for its development. Firstly the strategy for safety management based on EFQM (European Foundation for Quality Management) was defined with the development of standards, targets and indicators to implement security while the second part involved the introduction of tools, methodologies and knowledge to the management support of patient safety and risk prevention. The project was developed in four hospital areas considered higher risk, each assuming six goals for safety management. Some of these targets such as the security control panel or system of adverse event reporting were shared. 23 hospitals joined the project in Catalonia. Despite the different situations in each centre, high compliance was achieved in the development of the objectives. In each of the participating areas the security control panel was developed. Stable structures for safety management were established or strengthened. Training in patient safety played and important role, 1415 professionals participated. Through these kind of projects not only have been introduced programs of proven effectiveness in reducing risks, but they also provide to the facilities a work system that allows autonomy in diagnosis and analysis of the different risk situations or centre specific safety issues. Copyright © 2014. Published by Elsevier Espana.

  20. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  1. Safety management vs. picking leaves.

    PubMed

    Wright, D

    1991-09-01

    A safety program will generally have as its base a comprehensive written document made available for everyone in the organization. The document should indicate a positive commitment to safety by management. It should not be a "how to" guide, but rather a broad outline to establish responsibilities, goals, and methods. The safety manager is appointed in writing and answers to the highest level of management. As opposed to a "doer," the safety manager acts as a director and administrator of the safety program. This is accomplished through the advisory capacity of the safety program for solicited and unsolicited problems. The focus of the safety manager is on the system and how it contributes to safety problems, rather than individual problems. Management has the ultimate responsibility for safety. Their efforts should reflect a proactive attitude to correct problems in the system. In order to identify areas of interest, technically competent input from the safety manager should be required. The support of the safety program by top management determines the success of the program. Without a clear and firm commitment by the organization, safety will receive no more than lip service from the employees. The benefits of a proactive approach will be realized in the organization's ability to manage safety issues, rather than reacting to them.

  2. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  3. Project Management of Army Aircraft Survivability Equipment

    DTIC Science & Technology

    1976-11-01

    develop- ment trade-offs; and request for proposal (RFP) reviews involving advanced development (AD), engineering development (ED), and pro- ducibility...Safety: Ensur~e that adequate consideration is given safetyf throughout the life cycle of aviation surviva- bility equipment. -13. Project Manager Training...rate management effort to assure an orderly progression through its life cyIcle. Many of the items carry an urgent priority for worldwide applicatic

  4. The science of laboratory and project management in regulated bioanalysis.

    PubMed

    Unger, Steve; Lloyd, Thomas; Tan, Melvin; Hou, Jingguo; Wells, Edward

    2014-05-01

    Pharmaceutical drug development is a complex and lengthy process, requiring excellent project and laboratory management skills. Bioanalysis anchors drug safety and efficacy with systemic and site of action exposures. Development of scientific talent and a willingness to innovate or adopt new technology is essential. Taking unnecessary risks, however, should be avoided. Scientists must strategically assess all risks and find means to minimize or negate them. Laboratory Managers must keep abreast of ever-changing technology. Investments in instrumentation and laboratory design are critical catalysts to efficiency and safety. Matrix management requires regular communication between Project Managers and Laboratory Managers. When properly executed, it aligns the best resources at the right times for a successful outcome. Attention to detail is a critical aspect that separates excellent laboratories. Each assay is unique and requires attention in its development, validation and execution. Methods, training and facilities are the foundation of a bioanalytical laboratory.

  5. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  6. Patterns in Safety-Related Projects

    NASA Astrophysics Data System (ADS)

    Parsons, Mike; Hunter, Charles

    Within Logica UK, safety-related projects are run in a variety of ways depending on the constraints imposed and how the risks and mitigations are owned and handled. A total of eight different types of project development patterns have been identified and this paper discusses each type. A simple decision tool has been developed based on the patterns which is used as an aid in deciding how to bid a safety project, allowing tradeoffs between risk ownership, development methods and cost to be assessed.

  7. Study of Evaluation OSH Management System Policy Based On Safety Culture Dimensions in Construction Project

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko

    2017-07-01

    Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.

  8. MANAGING UNCERTAINTIES ASSOCIATED WITH RADIOACTIVE WASTE DISPOSAL: TASK GROUP 4 OF THE IAEA PRISM PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seitz, R.

    2011-03-02

    It is widely recognized that the results of safety assessment calculations provide an important contribution to the safety arguments for a disposal facility, but cannot in themselves adequately demonstrate the safety of the disposal system. The safety assessment and a broader range of arguments and activities need to be considered holistically to justify radioactive waste disposal at any particular site. Many programs are therefore moving towards the production of what has become known as a Safety Case, which includes all of the different activities that are conducted to demonstrate the safety of a disposal concept. Recognizing the growing interest inmore » the concept of a Safety Case, the International Atomic Energy Agency (IAEA) is undertaking an intercomparison and harmonization project called PRISM (Practical Illustration and use of the Safety Case Concept in the Management of Near-surface Disposal). The PRISM project is organized into four Task Groups that address key aspects of the Safety Case concept: Task Group 1 - Understanding the Safety Case; Task Group 2 - Disposal facility design; Task Group 3 - Managing waste acceptance; and Task Group 4 - Managing uncertainty. This paper addresses the work of Task Group 4, which is investigating approaches for managing the uncertainties associated with near-surface disposal of radioactive waste and their consideration in the context of the Safety Case. Emphasis is placed on identifying a wide variety of approaches that can and have been used to manage different types of uncertainties, especially non-quantitative approaches that have not received as much attention in previous IAEA projects. This paper includes discussions of the current results of work on the task on managing uncertainty, including: the different circumstances being considered, the sources/types of uncertainties being addressed and some initial proposals for approaches that can be used to manage different types of uncertainties.« less

  9. Failure Modes Effects and Criticality Analysis, an Underutilized Safety, Reliability, Project Management and Systems Engineering Tool

    NASA Astrophysics Data System (ADS)

    Mullin, Daniel Richard

    2013-09-01

    The majority of space programs whether manned or unmanned for science or exploration require that a Failure Modes Effects and Criticality Analysis (FMECA) be performed as part of their safety and reliability activities. This comes as no surprise given that FMECAs have been an integral part of the reliability engineer's toolkit since the 1950s. The reasons for performing a FMECA are well known including fleshing out system single point failures, system hazards and critical components and functions. However, in the author's ten years' experience as a space systems safety and reliability engineer, findings demonstrate that the FMECA is often performed as an afterthought, simply to meet contract deliverable requirements and is often started long after the system requirements allocation and preliminary design have been completed. There are also important qualitative and quantitative components often missing which can provide useful data to all of project stakeholders. These include; probability of occurrence, probability of detection, time to effect and time to detect and, finally, the Risk Priority Number. This is unfortunate as the FMECA is a powerful system design tool that when used effectively, can help optimize system function while minimizing the risk of failure. When performed as early as possible in conjunction with writing the top level system requirements, the FMECA can provide instant feedback on the viability of the requirements while providing a valuable sanity check early in the design process. It can indicate which areas of the system will require redundancy and which areas are inherently the most risky from the onset. Based on historical and practical examples, it is this author's contention that FMECAs are an immense source of important information for all involved stakeholders in a given project and can provide several benefits including, efficient project management with respect to cost and schedule, system engineering and requirements management

  10. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    Hogarth, P. T.

    1976-01-01

    Technology utilization projects in the area of urban construction and safety included the following: development of undercarpet and baseboard flat conductor cables, flood insurance studies, tornado safety engineering, the Project TECH house at the Langley Research Center, assistance to the City of Atlanta in their environmental habitability and resource allocation program, and market assessment of a solid state diesel engine controller. The flat conductor cable and the flood insurance studies are given particular attention.

  11. Nurse managers' challenges in project management.

    PubMed

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  12. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  13. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  14. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    NASA Astrophysics Data System (ADS)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  15. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    NASA Technical Reports Server (NTRS)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  16. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  17. Preoperative Safety Briefing Project

    PubMed Central

    DeFontes, James; Surbida, Stephanie

    2004-01-01

    Context: Increased media attention on surgical procedures that were performed on the wrong anatomic site or wrong patient has prompted the health care industry to identify and address human factors that lead to medical errors. Objective: To increase patient safety in the perioperative setting, our objective was to create a climate of improved communication, collaboration, team-work, and situational awareness while the surgical team reviewed pertinent information about the patient and the pending procedure. Methods: A team of doctors, nurses, and technicians used human factors principles to develop the Preoperative Safety Briefing for use by surgical teams, a briefing similar to the preflight checklist used by the airline industry. A six-month pilot of the briefing began in the Kaiser Permanente (KP) Anaheim Medical Center in February 2002. Four indicators of safety culture were used to measure success of the pilot: occurrence of wrong-site/wrong procedures, attitudinal survey data, near-miss reports, and nursing personnel turnover data. Results: Wrong-site surgeries decreased from 3 to 0 (300%) per year; employee satisfaction increased 19%; nursing personnel turnover decreased 16%; and perception of the safety climate in the operating room improved from “good” to “outstanding.” Operating suite personnel perception of teamwork quality improved substantially. Operating suite personnel perception of patient safety as a priority, of personnel communication, of their taking responsibility for patient safety, of nurse input being well received, of overall morale, and of medical errors being handled appropriately also improved substantially. Conclusions: Team members who work together and communicate well can quickly detect and more easily avoid errors. The Preoperative Safety Briefing is now standard in many operating suites in the KP Orange County Service Area. The concepts and design of this project are transferable, and similar projects are underway in the

  18. Achieving Safety through Security Management

    NASA Astrophysics Data System (ADS)

    Ridgway, John

    Whilst the achievement of safety objectives may not be possible purely through the administration of an effective Information Security Management System (ISMS), your job as safety manager will be significantly eased if such a system is in place. This paper seeks to illustrate the point by drawing a comparison between two of the prominent standards within the two disciplines of security and safety management.

  19. From the traditional concept of safety management to safety integrated with quality.

    PubMed

    García Herrero, Susana; Mariscal Saldaña, Miguel Angel; Manzanedo del Campo, Miguel Angel; Ritzel, Dale O

    2002-01-01

    This editorial reviews the evolution of the concepts of safety and quality that have been used in the traditional workplace. The traditional programs of safety are explored showing strengths and weaknesses. The concept of quality management is also viewed. Safety management and quality management principles, stages, and measurement are highlighted. The concepts of quality and safety guarantee are assessed. Total Quality Management concepts are reviewed and applied to safety quality. Total safety management principles are discussed. Finally, an analysis of the relationship between quality and safety from data collected from a company in Spain is presented.

  20. Improving patient safety and optimizing nursing teamwork using crew resource management techniques.

    PubMed

    West, Priscilla; Sculli, Gary; Fore, Amanda; Okam, Nwoha; Dunlap, Cleveland; Neily, Julia; Mills, Peter

    2012-01-01

    This project describes the application of the "sterile cockpit rule," a crew resource management (CRM) technique, targeted to improve efficacy and safety for nursing assistants in the performance of patient care duties. Crew resource management techniques have been successfully implemented in the aviation industry to improve flight safety. Application of these techniques can improve patient safety in medical settings. The Veterans Affairs (VA) National Center for Patient Safety conducted a CRM training program in select VA nursing units. One unit developed a novel application of the sterile cockpit rule to create protected time for certified nursing assistants (CNAs) while they collected vital signs and blood glucose data at the beginning of each shift. The typical nursing authority structure was reversed, with senior nurses protecting CNAs from distractions. This process led to improvements in efficiency and communication among nurses, with the added benefit of increased staff morale. Crew resource management techniques can be used to improve efficiency, morale, and patient safety in the healthcare setting.

  1. NASA's Aviation Safety and Modeling Project

    NASA Technical Reports Server (NTRS)

    Chidester, Thomas R.; Statler, Irving C.

    2006-01-01

    The Aviation Safety Monitoring and Modeling (ASMM) Project of NASA's Aviation Safety program is cultivating sources of data and developing automated computer hardware and software to facilitate efficient, comprehensive, and accurate analyses of the data collected from large, heterogeneous databases throughout the national aviation system. The ASMM addresses the need to provide means for increasing safety by enabling the identification and correcting of predisposing conditions that could lead to accidents or to incidents that pose aviation risks. A major component of the ASMM Project is the Aviation Performance Measuring System (APMS), which is developing the next generation of software tools for analyzing and interpreting flight data.

  2. Safety management by walking around (SMBWA): a safety intervention program based on both peer and manager participation.

    PubMed

    Luria, Gil; Morag, Ido

    2012-03-01

    "Management by walking around" (MBWA) is a practice that has aroused much interest in management science and practice. The purpose of this study is to demonstrate adaptation of this practice to safety management. We describe a three-year long case study that collected empirical data in which a modified MBWA was practiced in order to improve safety in a semiconductor fabrication facility. The main modification involved integrating an information system with the MBWA in order to create a practice that would generate safety leadership development and an organizational safety learning mechanism, while promoting employee safety participation. The results of the case study demonstrate that the SMBWA practice facilitated thousands of tours in which safety leadership behaviors were practiced by managers and by employees (employees performed five times as many tours as managers). The information system collected information about safety behaviors and safety conditions that could not otherwise be obtained. Thus, this study presents a new organizational safety practice SMBWA, and demonstrates the ways in which SMBWA may improve safety in organizations. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  4. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    PubMed Central

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  5. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    PubMed

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  6. Analysis of factors influencing safety management for metro construction in China.

    PubMed

    Yu, Q Z; Ding, L Y; Zhou, C; Luo, H B

    2014-07-01

    With the rapid development of urbanization in China, the number and size of metro construction projects are increasing quickly. At the same time, and increasing number of accidents in metro construction make it a disturbing focus of social attention. In order to improve safety management in metro construction, an investigation of the participants' perspectives on safety factors in China metro construction has been conducted to identify the key safety factors, and their ranking consistency among the main participants, including clients, consultants, designers, contractors and supervisors. The result of factor analysis indicates that there are five key factors which influence the safety of metro construction including safety attitude, construction site safety, government supervision, market restrictions and task unpredictability. In addition, ANOVA and Spearman rank correlation coefficients were performed to test the consistency of the means rating and the ranking of safety factors. The results indicated that the main participants have significant disagreement about the importance of safety factors on more than half of the items. Suggestions and recommendations on practical countermeasures to improve metro construction safety management in China are proposed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  7. The Environmental Management Project Manager`s Handbook for improved project definition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, whichmore » is the focus of this handbook.« less

  8. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  9. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    PubMed

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  10. Safety, Health, and Fire Prevention Guide for Hospital Safety Managers

    DTIC Science & Technology

    1993-03-01

    Safety committee S 2-5 Oxygen quality assurance program 0 2-6 Safety and fire prevention library 0 2-7 Safety services to Dental Activities • 2-8...Chapter 2 Safety Management 2-1. Safety policy statement Health Services Command (HSC) Supplement (Suppl) 1 to Army Regulation (AR) 385-10 and the...Management. (b) The medical staff. (c) The nursing service . (d) Logistics. (e) Nutritional care. (f) Preventive medicine. * 2-3 USAEHA TG No. 152 March 1993 (g

  11. The Development of Project Orion Ground Safety Requirements

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul; Condzella, Bill; Williams, Jeff

    2011-01-01

    In spite of a very compressed schedule, Project Orion's AFT safety team was able to pull together a comprehensive set of ground safety requirements using existing requirements and subject matter experts. These requirements will serve as the basis for the design of GSE and ground operations. Using the above lessons as a roadmap, new Projects can produce the same results. A rigorous set of ground safety requirements is required to assure ground support equipment (GSE) and associated flight hardware ground operations are conducted safety

  12. Evaluating Performance of Highway Safety Projects

    DOT National Transportation Integrated Search

    2016-12-01

    The purpose of this project was to investigate and document methods that the Idaho Transportation Department (ITD) and Local Highway Technical Assistance Council (LHTAC) can use to evaluate the performance of safety projects that have been implemente...

  13. A system safety model for developmental aircraft programs

    NASA Technical Reports Server (NTRS)

    Amberboy, E. J.; Stokeld, R. L.

    1982-01-01

    Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.

  14. Use of a Knowledge Management System in Waste Management Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gruendler, D.; Boetsch, W.U.; Holzhauer, U.

    2006-07-01

    In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspectmore » will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)« less

  15. [B-BS and occupational health and safety management systems].

    PubMed

    Bacchetta, Adriano Paolo

    2010-01-01

    The objective of a SGSL is the "prevention" agreement as approach of "pro-active" toward the safety at work through the construction of an integrated managerial system in synergic an dynamic way with the business organization, according to continuous improvement principles. Nevertheless the adoption of a SGSL, not could guarantee by itself the obtainment of the full effectiveness than projected and every individual's adhesion to it, must guarantee it's personal involvement in proactive way, so that to succeed to actual really how much hypothesized to systemic level to increase the safety in firm. The objective of a behavioral safety process that comes to be integrated in a SGSL, it has the purpose to succeed in implementing in firm a process of cultural change that raises the workers social group fundamental safety value, producing an ample and full involvement of all in the activities of safety at work development. SGSL = Occupational Health and Safety Management System.

  16. An IS Project Management Course Project

    ERIC Educational Resources Information Center

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  17. [Risk management project: reactive or proactive approach?].

    PubMed

    Vastola, Pasquale; Saracino, Donato M T

    2006-01-01

    Risk management in healthcare refers to the process of developing strategies aimed at preventing and controlling the risk of occurrence of errors and harmful events. The final objective is primarily that of increasing patient safety and secondarily, that of reducing the financial burden of adverse events. The implementation of a risk management system is therefore of vital strategic importance. Nevertheless, a fundamental question that needs to be answered in the operational phase is: should a proactive or reactive approach to risk management be taken? In our view, proactive risk management has many advantages over a reactive approach and is therefore preferable. The reactive approach should be taken exclusively to obtain information regarding risk and errors, in the preliminary, as well as monitoring and follow-up phases of the project.

  18. The art of appropriate evaluation : a guide for highway safety program managers

    DOT National Transportation Integrated Search

    2008-08-01

    The guide, updated from its original release in 1999, is intended for project managers who will oversee the evaluation of traffic safety programs. It describes the benefits of evaluation and provides an overview of the steps involved. The guide inclu...

  19. The art of appropriate evaluation : a guide for highway safety program managers

    DOT National Transportation Integrated Search

    2008-12-01

    The guide, updated from its original release in 1999, is intended for project managers who will oversee the evaluation of traffic safety programs. It describes the benefits of evaluation and provides an overview of the steps involved. The guide inclu...

  20. NASA aviation safety program aircraft engine health management data mining tools roadmap

    DOT National Transportation Integrated Search

    2000-04-01

    Aircraft Engine Health Management Data Mining Tools is a project led by NASA Glenn Research Center in support of the NASA Aviation Safety Program's Aviation System Monitoring and Modeling Thrust. The objective of the Glenn-led effort is to develop en...

  1. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  2. Predicting safety culture: the roles of employer, operations manager and safety professional.

    PubMed

    Wu, Tsung-Chih; Lin, Chia-Hung; Shiau, Sen-Yu

    2010-10-01

    This study explores predictive factors in safety culture. In 2008, a sample 939 employees was drawn from 22 departments of a telecoms firm in five regions in central Taiwan. The sample completed a questionnaire containing four scales: the employer safety leadership scale, the operations manager safety leadership scale, the safety professional safety leadership scale, and the safety culture scale. The sample was then randomly split into two subsamples. One subsample was used for measures development, one for the empirical study. A stepwise regression analysis found four factors with a significant impact on safety culture (R²=0.337): safety informing by operations managers; safety caring by employers; and safety coordination and safety regulation by safety professionals. Safety informing by operations managers (ß=0.213) was by far the most significant predictive factor. The findings of this study provide a framework for promoting a positive safety culture at the group level. Crown Copyright © 2010. Published by Elsevier Ltd. All rights reserved.

  3. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  4. Associations between safety climate and safety management practices in the construction industry.

    PubMed

    Marín, Luz S; Lipscomb, Hester; Cifuentes, Manuel; Punnett, Laura

    2017-06-01

    Safety climate, a group-level measure of workers' perceptions regarding management's safety priorities, has been suggested as a key predictor of safety outcomes. However, its relationship with actual injury rates is inconsistent. We posit that safety climate may instead be a parallel outcome of workplace safety practices, rather than a determinant of workers' safety behaviors or outcomes. Using a sample of 25 commercial construction companies in Colombia, selected by injury rate stratum (high, medium, low), we examined the relationship between workers' safety climate perceptions and safety management practices (SMPs) reported by safety officers. Workers' perceptions of safety climate were independent of their own company's implementation of SMPs, as measured here, and its injury rates. However, injury rates were negatively related to the implementation of SMPs. Safety management practices may be more important than workers' perceptions of safety climate as direct predictors of injury rates. © 2017 Wiley Periodicals, Inc.

  5. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  6. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  7. Project management process.

    DOT National Transportation Integrated Search

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  8. Assessment of contributions to patient safety knowledge by the Agency for Healthcare Research and Quality-funded patient safety projects.

    PubMed

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-04-01

    To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)'s patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Information abstracted from proposals for projects funded in AHRQ's patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. The 234 projects funded through AHRQ's patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. The projects funded in AHRQ's patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results

  9. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  10. 76 FR 14592 - Safety Management System; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ...-06A] RIN 2120-AJ15 Safety Management System; Withdrawal AGENCY: Federal Aviation Administration (FAA... (``product/ service providers'') to develop a Safety Management System (SMS). The FAA is withdrawing the... management with a set of robust decision-making tools to use to improve safety. The FAA received 89 comments...

  11. Chernobyl post-accident management: the ETHOS project.

    PubMed

    Dubreuil, G H; Lochard, J; Girard, P; Guyonnet, J F; Le Cardinal, G; Lepicard, S; Livolsi, P; Monroy, M; Ollagnon, H; Pena-Vega, A; Pupin, V; Rigby, J; Rolevitch, I; Schneider, T

    1999-10-01

    ETHOS is a pilot research project supported by the radiation protection research program of the European Commission (DG XII). The project provides an alternative approach to the rehabilitation of living conditions in the contaminated territories of the CIS in the post-accident context of Chernobyl. Initiated at the beginning of 1996, this 3-y project is currently being implemented in the Republic of Belarus. The ETHOS project involves an interdisciplinary team of European researchers from the following institutions: the Centre d'etude sur l'Evaluation de la Protection dans le domaine Nucleaire CEPN (radiological protection, economics), the Institute National d'Agronomie de Paris-Grignon INAPG (agronomy, nature & life management), the Compiegne University of Technology (technological and industrial safety, social trust), and the Mutadis Research Group (sociology, social risk management), which is in charge of the scientific co-ordination of the project. The Belarussian partners in the ETHOS project include the Ministry of Emergencies of Belarus as well as the various local authorities involved with the implementation site. The ETHOS project relies on a strong involvement of the local population in the rehabilitation process. Its main goal is to create conditions for the inhabitants of the contaminated territories to reconstruct their overall quality of life. This reconstruction deals with all the day-to-day aspects that have been affected or threatened by the contamination. The project aims at creating a dynamic process whereby acceptable living conditions can be rebuilt. Radiological security is developed in the ETHOS project as part of a general improvement in the quality of life. The approach does not dissociate the social and the technical dimensions of post-accident management. This is so as to avoid radiological risk assessment and management being reduced purely to a problem for scientific experts, from which local people are excluded, and to take into

  12. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  13. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  14. Assessment of Contributions to Patient Safety Knowledge by the Agency for Healthcare Research and Quality-Funded Patient Safety Projects

    PubMed Central

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-01-01

    Objective To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)' patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Data Sources Information abstracted from proposals for projects funded in AHRQ' patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. Study Design This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. Principal Findings The 234 projects funded through AHRQ' patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. Conclusions The projects funded in AHRQ' patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results. PMID:21456108

  15. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.

    PubMed

    Hasan, Abid; Jha, Kumar Neeraj

    2013-01-01

    Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.

  16. Database management systems for process safety.

    PubMed

    Early, William F

    2006-03-17

    Several elements of the process safety management regulation (PSM) require tracking and documentation of actions; process hazard analyses, management of change, process safety information, operating procedures, training, contractor safety programs, pre-startup safety reviews, incident investigations, emergency planning, and compliance audits. These elements can result in hundreds of actions annually that require actions. This tracking and documentation commonly is a failing identified in compliance audits, and is difficult to manage through action lists, spreadsheets, or other tools that are comfortably manipulated by plant personnel. This paper discusses the recent implementation of a database management system at a chemical plant and chronicles the improvements accomplished through the introduction of a customized system. The system as implemented modeled the normal plant workflows, and provided simple, recognizable user interfaces for ease of use.

  17. Safety intelligence: an exploration of senior managers' characteristics.

    PubMed

    Fruhen, L S; Mearns, K J; Flin, R; Kirwan, B

    2014-07-01

    Senior managers can have a strong influence on organisational safety. But little is known about which of their personal attributes support their impact on safety. In this paper, we introduce the concept of 'safety intelligence' as related to senior managers' ability to develop and enact safety policies and explore possible characteristics related to it in two studies. Study 1 (N = 76) involved direct reports to chief executive officers (CEOs) of European air traffic management (ATM) organisations, who completed a short questionnaire asking about characteristics and behaviours that are ideal for a CEO's influence on safety. Study 2 involved senior ATM managers (N = 9) in various positions in interviews concerning their day-to-day work on safety. Both studies indicated six attributes of senior managers as relevant for their safety intelligence, particularly, social competence and safety knowledge, followed by motivation, problem-solving, personality and interpersonal leadership skills. These results have recently been applied in guidance for safety management practices in a White Paper published by EUROCONTROL. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  18. Safety Management Systems.

    ERIC Educational Resources Information Center

    Fido, A. T.; Wood, D. O.

    This document discusses the issues that need to be considered by the education and training system as it responds to the changing needs of industry in Great Britain. Following a general introduction, the development of quality management ideas is traced. The underlying principles of safety and risk management are clarified and the implications of…

  19. All Hazards Risk Assessment Transition Project: Report on Capability Assessment Management System (CAMS) Automation

    DTIC Science & Technology

    2014-04-01

    All Hazards Risk Assessment Transition Project : Report on Capability Assessment Management System (CAMS) Automation...Prepared by: George Giroux Computer Applications Specialist Modis155 Queen Street, Suite 1206 Ottawa, ON K1P 6L1 Contract # THS 2335474-2 Project ...Under a Canadian Safety and Security Program (CSSP) targeted investigation (TI) project (CSSP-2012-TI- 1108), Defence Research and Development

  20. SafetyAnalyst : software tools for safety management of specific highway sites

    DOT National Transportation Integrated Search

    2010-07-01

    SafetyAnalyst provides a set of software tools for use by state and local highway agencies for highway safety management. SafetyAnalyst can be used by highway agencies to improve their programming of site-specific highway safety improvements. SafetyA...

  1. Library Digitisation Project Management.

    ERIC Educational Resources Information Center

    Middleton, Michael

    Supervision of library digitization is the focus of this paper. First outlined are the definition, formalization, implementation, and completion phases of project management. Descriptions of management decisions involved in digitization projects follow on matters such as: collection analysis, resourcing, project personnel, production, access and…

  2. Project safety as a sustainable competitive advantage.

    PubMed

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  3. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  4. Managing Safety and Operations: The Effect of Joint Management System Practices on Safety and Operational Outcomes.

    PubMed

    Tompa, Emile; Robson, Lynda; Sarnocinska-Hart, Anna; Klassen, Robert; Shevchenko, Anton; Sharma, Sharvani; Hogg-Johnson, Sheilah; Amick, Benjamin C; Johnston, David A; Veltri, Anthony; Pagell, Mark

    2016-03-01

    The aim of this study was to determine whether management system practices directed at both occupational health and safety (OHS) and operations (joint management system [JMS] practices) result in better outcomes in both areas than in alternative practices. Separate regressions were estimated for OHS and operational outcomes using data from a survey along with administrative records on injuries and illnesses. Organizations with JMS practices had better operational and safety outcomes than organizations without these practices. They had similar OHS outcomes as those with operations-weak practices, and in some cases, better outcomes than organizations with safety-weak practices. They had similar operational outcomes as those with safety-weak practices, and better outcomes than those with operations-weak practices. Safety and operations appear complementary in organizations with JMS practices in that there is no penalty for either safety or operational outcomes.

  5. Restaurant manager and worker food safety certification and knowledge.

    PubMed

    Brown, Laura G; Le, Brenda; Wong, Melissa R; Reimann, David; Nicholas, David; Faw, Brenda; Davis, Ernestine; Selman, Carol A

    2014-11-01

    Over half of foodborne illness outbreaks occur in restaurants. To combat these outbreaks, many public health agencies require food safety certification for restaurant managers, and sometimes workers. Certification entails passing a food safety knowledge examination, which is typically preceded by food safety training. Current certification efforts are based on the assumption that certification leads to greater food safety knowledge. The Centers for Disease Control and Prevention conducted this study to examine the relationship between food safety knowledge and certification. We also examined the relationships between food safety knowledge and restaurant, manager, and worker characteristics. We interviewed managers (N=387) and workers (N=365) about their characteristics and assessed their food safety knowledge. Analyses showed that certified managers and workers had greater food safety knowledge than noncertified managers and workers. Additionally, managers and workers whose primary language was English had greater food safety knowledge than those whose primary language was not English. Other factors associated with greater food safety knowledge included working in a chain restaurant, working in a larger restaurant, having more experience, and having more duties. These findings indicate that certification improves food safety knowledge, and that complex relationships exist among restaurant, manager, and worker characteristics and food safety knowledge.

  6. Restaurant Manager and Worker Food Safety Certification and Knowledge

    PubMed Central

    Brown, Laura G.; Le, Brenda; Wong, Melissa R.; Reimann, David; Nicholas, David; Faw, Brenda; Davis, Ernestine; Selman, Carol A.

    2017-01-01

    Over half of foodborne illness outbreaks occur in restaurants. To combat these outbreaks, many public health agencies require food safety certification for restaurant managers, and sometimes workers. Certification entails passing a food safety knowledge examination, which is typically preceded by food safety training. Current certification efforts are based on the assumption that certification leads to greater food safety knowledge. The Centers for Disease Control and Prevention conducted this study to examine the relationship between food safety knowledge and certification. We also examined the relationships between food safety knowledge and restaurant, manager, and worker characteristics. We interviewed managers (N = 387) and workers (N = 365) about their characteristics and assessed their food safety knowledge. Analyses showed that certified managers and workers had greater food safety knowledge than noncertified managers and workers. Additionally, managers and workers whose primary language was English had greater food safety knowledge than those whose primary language was not English. Other factors associated with greater food safety knowledge included working in a chain restaurant, working in a larger restaurant, having more experience, and having more duties. These findings indicate that certification improves food safety knowledge, and that complex relationships exist among restaurant, manager, and worker characteristics and food safety knowledge. PMID:25361386

  7. [A simplified occupational health and safety management system designed for small enterprises. Initial validation results].

    PubMed

    Bacchi, Romana; Veneri, L; Ghini, P; Caso, Maria Alessandra; Baldassarri, Giovanna; Renzetti, F; Santarelli, R

    2009-01-01

    Occupational Health and Safety Management Systems (OHSMS) are known to be effective in improving safety at work. Unfortunately they are often too resource-heavy for small businesses. The aim of this project was to develop and test a simplified model of OHSMS suitable for small enterprises. The model consists of 7 procedures and various operating forms and check lists, that guide the enterprise in managing safety at work. The model was tested in 15 volunteer enterprises. In most of the enterprises two audits showed increased awareness and participation of workers; better definition and formalisation of respon sibilities in 8 firms; election of Union Safety Representatives in over one quarter of the enterprises; improvement of safety equipment. The study also helped identify areas where the model could be improved by simplification of unnecessarily complex and redundant procedures.

  8. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  9. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  10. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  11. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  12. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  13. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  14. 46 CFR 107.415 - Safety Management Certificate.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Safety Management Certificate. 107.415 Section 107.415 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Certificates Under International Convention for Safety of Life at Sea, 1974 § 107.415 Safety Management Certificate. (a)...

  15. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  16. Clinical Trial Electronic Portals for Expedited Safety Reporting: Recommendations from the Clinical Trials Transformation Initiative Investigational New Drug Safety Advancement Project.

    PubMed

    Perez, Raymond P; Finnigan, Shanda; Patel, Krupa; Whitney, Shanell; Forrest, Annemarie

    2016-12-15

    Use of electronic clinical trial portals has increased in recent years to assist with sponsor-investigator communication, safety reporting, and clinical trial management. Electronic portals can help reduce time and costs associated with processing paperwork and add security measures; however, there is a lack of information on clinical trial investigative staff's perceived challenges and benefits of using portals. The Clinical Trials Transformation Initiative (CTTI) sought to (1) identify challenges to investigator receipt and management of investigational new drug (IND) safety reports at oncologic investigative sites and coordinating centers and (2) facilitate adoption of best practices for communicating and managing IND safety reports using electronic portals. CTTI, a public-private partnership to improve the conduct of clinical trials, distributed surveys and conducted interviews in an opinion-gathering effort to record investigator and research staff views on electronic portals in the context of the new safety reporting requirements described in the US Food and Drug Administration's final rule (Code of Federal Regulations Title 21 Section 312). The project focused on receipt, management, and review of safety reports as opposed to the reporting of adverse events. The top challenge investigators and staff identified in using individual sponsor portals was remembering several complex individual passwords to access each site. Also, certain tasks are time-consuming (eg, downloading reports) due to slow sites or difficulties associated with particular operating systems or software. To improve user experiences, respondents suggested that portals function independently of browsers and operating systems, have intuitive interfaces with easy navigation, and incorporate additional features that would allow users to filter, search, and batch safety reports. Results indicate that an ideal system for sharing expedited IND safety information is through a central portal used by

  17. Initial development of a practical safety audit tool to assess fleet safety management practices.

    PubMed

    Mitchell, Rebecca; Friswell, Rena; Mooren, Lori

    2012-07-01

    Work-related vehicle crashes are a common cause of occupational injury. Yet, there are few studies that investigate management practices used for light vehicle fleets (i.e. vehicles less than 4.5 tonnes). One of the impediments to obtaining and sharing information on effective fleet safety management is the lack of an evidence-based, standardised measurement tool. This article describes the initial development of an audit tool to assess fleet safety management practices in light vehicle fleets. The audit tool was developed by triangulating information from a review of the literature on fleet safety management practices and from semi-structured interviews with 15 fleet managers and 21 fleet drivers. A preliminary useability assessment was conducted with 5 organisations. The audit tool assesses the management of fleet safety against five core categories: (1) management, systems and processes; (2) monitoring and assessment; (3) employee recruitment, training and education; (4) vehicle technology, selection and maintenance; and (5) vehicle journeys. Each of these core categories has between 1 and 3 sub-categories. Organisations are rated at one of 4 levels on each sub-category. The fleet safety management audit tool is designed to identify the extent to which fleet safety is managed in an organisation against best practice. It is intended that the audit tool be used to conduct audits within an organisation to provide an indicator of progress in managing fleet safety and to consistently benchmark performance against other organisations. Application of the tool by fleet safety researchers is now needed to inform its further development and refinement and to permit psychometric evaluation. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. School Safety Project: Product Evaluation, 1990-1991.

    ERIC Educational Resources Information Center

    Saginaw Public Schools, MI. Dept. of Evaluation Services.

    A districtwide school safety project implemented in Saginaw, Michigan, in 1990-91, the third year of its operation, is evaluated in this report. The project is evaluated on the basis of the following objectives: employment and training of home-school liaison officers; establishment of an advisory council; development and implementation of…

  19. Improving the coordination of patients' medication management: a regional Finnish development project.

    PubMed

    Kivekäs, Eija; Luukkonen, Irmeli; Mykkänen, Juha; Saranto, Kaija

    2014-01-01

    In this paper, we present an overview of activities and results from a regional development project in Finland. The aim in this project was to analyze how healthcare providers produce and receive information on a patient's medication, and to identify opportunities to improve the quality, effectiveness, availability and collaboration of social and healthcare services in relation to medication information. The project focused on the most important points in patients' medication management such as home care and care transitions. In a regional development project, data was gathered by interviews and a multi professional workshop. The study revealed that medication information reached only some professionals and lay caregivers despite electronic patient record (EPR) systems and tools. Differences in work processes related to medication reconciliation and information management were discussed in the group meeting and were regarded as a considerable risk for patient safety.

  20. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  1. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  2. Health and safety management systems: liability or asset?

    PubMed

    Bennett, David

    2002-01-01

    Health and safety management systems have a background in theory and in various interests among employers and workplace health and safety professionals. These have resulted in a number of national systems emanating from national standard-writing centres and from employers' organizations. In some cases these systems have been recognized as national standards. The contenders for an international standard have been the International Organization of Standardization (ISO) and the International Labour Organization (ILO). The quality and environmental management systems of ISO indicate what an ISO health and safety management standard would look like. The ILO Guidelines on Safety and Health Management Systems, by contrast, are stringent, specific and potentially effective in improving health and safety performance in the workplace.

  3. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  4. 46 CFR 71.75-13 - Safety Management Certificate.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Safety Management Certificate. 71.75-13 Section 71.75-13... CERTIFICATION Certificates Under the International Convention for Safety of Life at Sea, 1960 § 71.75-13 Safety... valid Safety Management Certificate and a copy of their company's valid Document of Compliance...

  5. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  6. Safety equipment list for the 241-SY-101 RAPID mitigation project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MORRIS, K.L.

    1999-06-29

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein.

  7. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  8. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  9. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  10. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  11. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  12. The Project Manager's Tool Kit

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2003-01-01

    Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

  13. Perceived safety management practices in the logistics sector.

    PubMed

    Auyong, Hui-Nee; Zailani, Suhaiza; Surienty, Lilis

    2016-03-09

    Malaysia's progress on logistics has been slowed to keep pace with its growth in trade. The Government has been pressing companies to improve the safety of their activities in order to reduce society's loss due to occupational accidents and illnesses. Occupational safety and health is a crucial part of a workplace because every worker has to take care of his/her own safety and health. The main occupational safety and health (OSH) national policy in Malaysia is the enactment of the Occupational Safety and Health Act (OSHA) 1994. Only those companies which have excellent health and safety care have good quality and productive employees. This study investigated safety management practices in the logistics sector. The present study is concerned with the human factors to safety in the logistics industry. The authors examined the perceived safety management practices of workers in the logistics sector. The purpose was to identify the perception of safety management practices of Malaysian logistics personnel. Survey questionnaires were distributed to assess logistics personnel about management commitment. The quantitative method using the availability sampling method was applied. The data gathered from the survey were analysed using SPSS software. The responses to the survey were rated according to the Likert scale type, with '1' indicating strongly disagree and '5' indicating strongly agree. One hundred and three employees of logistics functions completed the survey. The highest mean scores were found for fire apparatus, prioritisation of safety, and safety policy. The results from this study also emphasise the importance of the management's commitment in enhancing workplace safety. Specifically, companies should maintain good relations between the employer and the employee to help reduce workplace injuries.

  14. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The purpose and functions of NASA technology applications temas (TAT) are described, with emphasis on the activities of the Urban and Construction and Safety Project. The transfer and implementation of technology is discussed in five activities. Topics include: flat conductor cable, NASA house and compendium, flood insurance studies, tornado studies, and the controller for stationary diesels.

  15. System safety management: A new discipline

    NASA Technical Reports Server (NTRS)

    Pope, W. C.

    1971-01-01

    The systems theory is discussed in relation to safety management. It is suggested that systems safety management, as a new discipline, holds great promise for reducing operating errors, conserving labor resources, avoiding operating costs due to mistakes, and for improving managerial techniques. It is pointed out that managerial failures or system breakdowns are the basic reasons for human errors and condition defects. In this respect, a recommendation is made that safety engineers stop visualizing the problem only with the individual (supervisor or employee) and see the problem from the systems point of view.

  16. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  17. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  18. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as

  19. Another Approach to Enhance Airline Safety: Using Management Safety Tools

    NASA Technical Reports Server (NTRS)

    Lu, Chien-tsug; Wetmore, Michael; Przetak, Robert

    2006-01-01

    The ultimate goal of conducting an accident investigation is to prevent similar accidents from happening again and to make operations safer system-wide. Based on the findings extracted from the investigation, the "lesson learned" becomes a genuine part of the safety database making risk management available to safety analysts. The airline industry is no exception. In the US, the FAA has advocated the usage of the System Safety concept in enhancing safety since 2000. Yet, in today s usage of System Safety, the airline industry mainly focuses on risk management, which is a reactive process of the System Safety discipline. In order to extend the merit of System Safety and to prevent accidents beforehand, a specific System Safety tool needs to be applied; so a model of hazard prediction can be formed. To do so, the authors initiated this study by reviewing 189 final accident reports from the National Transportation Safety Board (NTSB) covering FAR Part 121 scheduled operations. The discovered accident causes (direct hazards) were categorized into 10 groups Flight Operations, Ground Crew, Turbulence, Maintenance, Foreign Object Damage (FOD), Flight Attendant, Air Traffic Control, Manufacturer, Passenger, and Federal Aviation Administration. These direct hazards were associated with 36 root factors prepared for an error-elimination model using Fault Tree Analysis (FTA), a leading tool for System Safety experts. An FTA block-diagram model was created, followed by a probability simulation of accidents. Five case studies and reports were provided in order to fully demonstrate the usefulness of System Safety tools in promoting airline safety.

  20. AN ADVANCED TOOL FOR APPLIED INTEGRATED SAFETY MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Potts, T. Todd; Hylko, James M.; Douglas, Terence A.

    2003-02-27

    WESKEM, LLC's Environmental, Safety and Health (ES&H) Department had previously assessed that a lack of consistency, poor communication and using antiquated communication tools could result in varying operating practices, as well as a failure to capture and disseminate appropriate Integrated Safety Management (ISM) information. To address these issues, the ES&H Department established an Activity Hazard Review (AHR)/Activity Hazard Analysis (AHA) process for systematically identifying, assessing, and controlling hazards associated with project work activities during work planning and execution. Depending on the scope of a project, information from field walkdowns and table-top meetings are collected on an AHR form. The AHAmore » then documents the potential failure and consequence scenarios for a particular hazard. Also, the AHA recommends whether the type of mitigation appears appropriate or whether additional controls should be implemented. Since the application is web based, the information is captured into a single system and organized according to the >200 work activities already recorded in the database. Using the streamlined AHA method improved cycle time from over four hours to an average of one hour, allowing more time to analyze unique hazards and develop appropriate controls. Also, the enhanced configuration control created a readily available AHA library to research and utilize along with standardizing hazard analysis and control selection across four separate work sites located in Kentucky and Tennessee. The AHR/AHA system provides an applied example of how the ISM concept evolved into a standardized field-deployed tool yielding considerable efficiency gains in project planning and resource utilization. Employee safety is preserved through detailed planning that now requires only a portion of the time previously necessary. The available resources can then be applied to implementing appropriate engineering, administrative and personal protective

  1. Evidence-based safety (EBS) management: A new approach to teaching the practice of safety management (SM).

    PubMed

    Wang, Bing; Wu, Chao; Shi, Bo; Huang, Lang

    2017-12-01

    In safety management (SM), it is important to make an effective safety decision based on the reliable and sufficient safety-related information. However, many SM failures in organizations occur for a lack of the necessary safety-related information for safety decision-making. Since facts are the important basis and foundation for decision-making, more efforts to seek the best evidence relevant to a particular SM problem would lead to a more effective SM solution. Therefore, the new paradigm for decision-making named "evidence-based practice (EBP)" can hold important implications for SM, because it uses the current best evidence for effective decision-making. Based on a systematic review of existing SM approaches and an analysis of reasons why we need new SM approaches, we created a new SM approach called evidence-based safety (EBS) management by introducing evidence-based practice into SM. It was necessary to create new SM approaches. A new SM approach called EBS was put forward, and the basic questions of EBS such as its definition and core were analyzed in detail. Moreover, the determinants of EBS included manager's attitudes towards EBS; evidence-based consciousness in SM; evidence sources; technical support; EBS human resources; organizational culture; and individual attributes. EBS is a new and effective approach to teaching the practice of SM. Of course, further research on EBS should be carried out to make EBS a reality. Practical applications: Our work can provide a new and effective idea and method to teach the practice of SM. Specifically, EBS proposed in our study can help safety professionals make an effective safety decision based on a firm foundation of high-grade evidence. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  2. The Research on Safety Management Information System of Railway Passenger Based on Risk Management Theory

    NASA Astrophysics Data System (ADS)

    Zhu, Wenmin; Jia, Yuanhua

    2018-01-01

    Based on the risk management theory and the PDCA cycle model, requirements of the railway passenger transport safety production is analyzed, and the establishment of the security risk assessment team is proposed to manage risk by FTA with Delphi from both qualitative and quantitative aspects. The safety production committee is also established to accomplish performance appraisal, which is for further ensuring the correctness of risk management results, optimizing the safety management business processes and improving risk management capabilities. The basic framework and risk information database of risk management information system of railway passenger transport safety are designed by Ajax, Web Services and SQL technologies. The system realizes functions about risk management, performance appraisal and data management, and provides an efficient and convenient information management platform for railway passenger safety manager.

  3. PRELIMINARY NUCLEAR CRITICALITY NUCLEAR SAFETY EVLAUATION FOR THE CONTAINER SURVEILLANCE AND STORAGE CAPABILITY PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Low, M; Matthew02 Miller, M; Thomas Reilly, T

    2007-04-30

    Washington Safety Management Solutions (WSMS) provides criticality safety services to Washington Savannah River Company (WSRC) at the Savannah River Site. One activity at SRS is the Container Surveillance and Storage Capability (CSSC) Project, which will perform surveillances on 3013 containers (hereafter referred to as 3013s) to verify that they meet the Department of Energy (DOE) Standard (STD) 3013 for plutonium storage. The project will handle quantities of material that are greater than ANS/ANSI-8.1 single parameter mass limits, and thus required a Nuclear Criticality Safety Evaluation (NCSE). The WSMS methodology for conducting an NCSE is outlined in the WSMS methods manual.more » The WSMS methods manual currently follows the requirements of DOE-O-420.1B, DOE-STD-3007-2007, and the Washington Savannah River Company (WSRC) SCD-3 manual. DOE-STD-3007-2007 describes how a NCSE should be performed, while DOE-O-420.1B outlines the requirements for a Criticality Safety Program (CSP). The WSRC SCD-3 manual implements DOE requirements and ANS standards. NCSEs do not address the Nuclear Criticality Safety (NCS) of non-reactor nuclear facilities that may be affected by overt or covert activities of sabotage, espionage, terrorism or other security malevolence. Events which are beyond the Design Basis Accidents (DBAs) are outside the scope of a double contingency analysis.« less

  4. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  5. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    NASA Technical Reports Server (NTRS)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  6. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  7. Modeling and analyzing traffic safety perceptions: An application to the speed limit reduction pilot project in Edmonton, Alberta.

    PubMed

    El-Basyouny, Karim; El-Bassiouni, Mohamed Yahia

    2013-03-01

    To address the speeding problem in residential areas, the City of Edmonton initiated a pilot project to reduce the posted speed limit from 50km/h to 40km/h within six residential communities. This paper investigates the community perceptions of traffic safety within the six pilot communities in two phases: prior to project initiation (pre-pilot) and following the end of the project (post-pilot). This objective was accomplished by analyzing the results of two random dialing telephone surveys comprising 300 residents each. A preliminary analysis showed compatible demographic configurations for the two samples and confirmed that the residents were aware of both the posted speed limits and the adopted speed management controls. For the confirmatory factor analysis (CFA), a two-group (pre-pilot and post-pilot) three-factor model was used to assess the residents' perceptions of the speeding behavior (Speeding), their concerns about traffic safety issues (Concerns), and their perceptions of traffic safety (Safety). Comparing the CFA results of the post-pilot survey versus those of the pre-pilot survey, it was evident that there was a significant decrease in Speeding and Concerns accompanied by a significant increase in Safety. A structural equations model (SEM) was also fitted to the data in order to assess the impact of Speeding and Concerns on Safety. The results showed that Concerns increase significantly with Speeding, and that both factors have significant negative impacts on Safety. However, while the impact of Concerns on Safety was direct, that of Speeding on Safety was largely indirect (i.e., mediated through Concerns). Overall, the multivariate analysis has demonstrated that the pilot project was successful in improving the residents' perceptions of traffic safety in their community. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  8. Safety management practices in small and medium enterprises in India.

    PubMed

    Unnikrishnan, Seema; Iqbal, Rauf; Singh, Anju; Nimkar, Indrayani M

    2015-03-01

    Small and medium enterprises (SMEs) are often the main pillar of an economy. Minor accidents, ergonomics problems, old and outdated machinery, and lack of awareness have created a need for implementation of safety practices in SMEs. Implementation of healthy working conditions creates positive impacts on economic and social development. In this study, a questionnaire was developed and administered to 30 randomly chosen SMEs in and around Mumbai, Maharashtra, and other states in India to evaluate safety practices implemented in their facilities. The study also looked into the barriers and drivers for technology innovation and suggestions were also received from the respondent SMEs for best practices on safety issues. In some SMEs, risks associated with safety issues were increased whereas risks were decreased in others. Safety management practices are inadequate in most SMEs. Market competitiveness, better efficiency, less risk, and stringent laws were found to be most significant drivers; and financial constraints, lack of awareness, resistance to change, and lack of training for employees were found to be main barriers. Competition between SMEs was found to be major reason for implementation of safety practices in the SMEs. The major contribution of the study has been awareness building on safety issues in the SMEs that participated in the project.

  9. Safety Management Practices in Small and Medium Enterprises in India

    PubMed Central

    Unnikrishnan, Seema; Iqbal, Rauf; Singh, Anju; Nimkar, Indrayani M.

    2014-01-01

    Background Small and medium enterprises (SMEs) are often the main pillar of an economy. Minor accidents, ergonomics problems, old and outdated machinery, and lack of awareness have created a need for implementation of safety practices in SMEs. Implementation of healthy working conditions creates positive impacts on economic and social development. Methods In this study, a questionnaire was developed and administered to 30 randomly chosen SMEs in and around Mumbai, Maharashtra, and other states in India to evaluate safety practices implemented in their facilities. The study also looked into the barriers and drivers for technology innovation and suggestions were also received from the respondent SMEs for best practices on safety issues. Results In some SMEs, risks associated with safety issues were increased whereas risks were decreased in others. Safety management practices are inadequate in most SMEs. Market competitiveness, better efficiency, less risk, and stringent laws were found to be most significant drivers; and financial constraints, lack of awareness, resistance to change, and lack of training for employees were found to be main barriers. Conclusion Competition between SMEs was found to be major reason for implementation of safety practices in the SMEs. The major contribution of the study has been awareness building on safety issues in the SMEs that participated in the project. PMID:25830070

  10. Improving safety in small enterprises through an integrated safety management intervention.

    PubMed

    Kines, Pete; Andersen, Dorte; Andersen, Lars Peter; Nielsen, Kent; Pedersen, Louise

    2013-02-01

    This study tests the applicability of a participatory behavior-based injury prevention approach integrated with safety culture initiatives. Sixteen small metal industry enterprises (10-19 employees) are randomly assigned to receive the intervention or not. Safety coaching of owners/managers result in the identification of 48 safety tasks, 85% of which are solved at follow-up. Owner/manager led constructive dialogue meetings with workers result in the prioritization of 29 tasks, 79% of which are accomplished at follow-up. Intervention enterprises have significant increases on six of eight safety-perception-survey factors, while comparisons increase on only one factor. Both intervention and comparison enterprises demonstrate significant increases in their safety observation scores. Interview data validate and supplement these results, providing some evidence for behavior change and the initiation of safety culture change. Given that over 95% of enterprises in most countries have less than 20 employees, there is great potential for adapting this integrated approach to other industries. Copyright © 2012 National Safety Council and Elsevier Ltd. All rights reserved.

  11. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  12. A web-based tool for the Comprehensive Unit-based Safety Program (CUSP).

    PubMed

    Pronovost, Peter J; King, Jay; Holzmueller, Christine G; Sawyer, Melinda; Bivens, Shauna; Michael, Michelle; Haig, Kathy; Paine, Lori; Moore, Dana; Miller, Marlene

    2006-03-01

    An organization's ability to change is driven by its culture, which in turn has a significant impact on safety. The six-step Comprehensive Unit-Based Safety Program (CUSP) is intended to improve local culture and safety. A Web-based project management tool for CUSP was developed and then pilot tested at two hospitals. HOW ECUSP WORKS: Once a patient safety concern is identified (step 3), a unit-level interdisciplinary safety committee determines issue criticality and starts up the projects (step 4), which are managed using project management tools within eCUSP (step 5). On a project's completion, the results are disseminated through a shared story (step 6). OSF St. Joseph's Medical Center-The Medical Birthing Center (Bloomington, Illinois), identified 11 safety issues, implemented 11 projects, and created 9 shared stories--including one for its Armband Project. The Johns Hopkins Hospital (Baltimore) Medical Progressive Care (MPC4) Unit identified 5 safety issues and implemented 4 ongoing projects, including the intravenous (IV) Tubing Compliance Project. The eCUSP tool's success depends on an organizational commitment to creating a culture of safety.

  13. Safety behavior: Job demands, job resources, and perceived management commitment to safety.

    PubMed

    Hansez, Isabelle; Chmiel, Nik

    2010-07-01

    The job demands-resources model posits that job demands and resources influence outcomes through job strain and work engagement processes. We test whether the model can be extended to effort-related "routine" safety violations and "situational" safety violations provoked by the organization. In addition we test more directly the involvement of job strain than previous studies which have used burnout measures. Structural equation modeling provided, for the first time, evidence of predicted relationships between job strain and "routine" violations and work engagement with "routine" and "situational" violations, thereby supporting the extension of the job demands-resources model to safety behaviors. In addition our results showed that a key safety-specific construct 'perceived management commitment to safety' added to the explanatory power of the job demands-resources model. A predicted path from job resources to perceived management commitment to safety was highly significant, supporting the view that job resources can influence safety behavior through both general motivational involvement in work (work engagement) and through safety-specific processes.

  14. Achievements and Perspectives of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Louvat, D.; Lacoste, A.C.

    The Joint Convention on the Safety of Spent Fuel management and on the Safety of Radioactive Waste Management is the first legal instrument to directly address the safety of spent fuel and radioactive waste management on a global scale. The Joint Convention entered into force in 2001. This paper describes its process and its main achievements to date. The perspectives to establish of a Global Waste Safety Regime based on the Joint Convention are also discussed. (authors)

  15. I-25 truck safety improvements project : local evaluation report

    DOT National Transportation Integrated Search

    2004-12-29

    The I-25 Truck Safety Improvements project (I-25 TSIP) is the result of a FY98 congressionally designated earmark to support improvements in transportation efficiency, promote safety, increase traffic flow, reduce emissions, improve traveler informat...

  16. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  17. 33 CFR 96.220 - What makes up a safety management system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.220 What makes up a safety management system? (a) The safety management system must document the responsible person's— (1) Safety and pollution prevention...

  18. Management Commitment to Safety, Teamwork, and Hospital Worker Injuries.

    PubMed

    McGonagle, Alyssa K; Essenmacher, Lynnette; Hamblin, Lydia; Luborsky, Mark; Upfal, Mark; Arnetz, Judith

    2016-01-01

    Although many studies link teamwork in health care settings to patient safety, evidence linking teamwork to hospital worker safety is lacking. This study addresses this gap by providing evidence linking teamwork perceptions in hospital workers to worker injuries, and further, finds a linkage between manager commitment to safety and teamwork. Organizational records of worker injuries and survey responses regarding management commitment to safety and teamwork from 446 hospital workers within 42 work units in a multi-site hospital system were examined. Results underscored the particular importance of teamwork on worker injuries as well as the importance of management commitment to safety as relating to teamwork. To improve worker safety, organizational leaders and unit managers should work to maintain environments wherein teamwork can thrive.

  19. Management Commitment to Safety, Teamwork, and Hospital Worker Injuries

    PubMed Central

    McGonagle, Alyssa K.; Essenmacher, Lynnette; Hamblin, Lydia; Luborsky, Mark; Upfal, Mark; Arnetz, Judith

    2016-01-01

    Although many studies link teamwork in health care settings to patient safety, evidence linking teamwork to hospital worker safety is lacking. This study addresses this gap by providing evidence linking teamwork perceptions in hospital workers to worker injuries, and further, finds a linkage between manager commitment to safety and teamwork. Organizational records of worker injuries and survey responses regarding management commitment to safety and teamwork from 446 hospital workers within 42 work units in a multi-site hospital system were examined. Results underscored the particular importance of teamwork on worker injuries as well as the importance of management commitment to safety as relating to teamwork. To improve worker safety, organizational leaders and unit managers should work to maintain environments wherein teamwork can thrive. PMID:27867448

  20. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  1. Safety and Waste Management for SAM Pathogen Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the pathogens included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  2. Safety and Waste Management for SAM Biotoxin Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the biotoxins included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  3. Should Project Managers Buy Technical Data

    DTIC Science & Technology

    2017-04-06

    Should Project Managers Buy Technical Data? Jerry Harper April 6, 2017 PUBLISHED BY The Defense...intellectual property (IP) management and technical data rights (TDR) strategies. According to DoD Instruction 5000.02 (DoD, 2017), project managers (PMs...Defense Authorization Act NDI ................nondevelopmental item PM ................. project manager R&D ...............research and development

  4. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  5. Safety and Waste Management for SAM Chemistry Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the chemical analytes included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  6. Safety and Waste Management for SAM Radiochemical Methods

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for the radiochemical analytes included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  7. 46 CFR 91.60-30 - Safety Management Certificate.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Safety Management Certificate. 91.60-30 Section 91.60-30 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS INSPECTION AND CERTIFICATION Certificates Under International Convention for Safety of Life at Sea, 1974 § 91.60-30 Safety Management Certificate. All...

  8. Design an optimum safety policy for personnel safety management - A system dynamic approach

    NASA Astrophysics Data System (ADS)

    Balaji, P.

    2014-10-01

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamics model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.

  9. Design an optimum safety policy for personnel safety management - A system dynamic approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balaji, P.

    2014-10-06

    Personnel safety management (PSM) ensures that employee's work conditions are healthy and safe by various proactive and reactive approaches. Nowadays it is a complex phenomenon because of increasing dynamic nature of organisations which results in an increase of accidents. An important part of accident prevention is to understand the existing system properly and make safety strategies for that system. System dynamics modelling appears to be an appropriate methodology to explore and make strategy for PSM. Many system dynamics models of industrial systems have been built entirely for specific host firms. This thesis illustrates an alternative approach. The generic system dynamicsmore » model of Personnel safety management was developed and tested in a host firm. The model was undergone various structural, behavioural and policy tests. The utility and effectiveness of model was further explored through modelling a safety scenario. In order to create effective safety policy under resource constraint, DOE (Design of experiment) was used. DOE uses classic designs, namely, fractional factorials and central composite designs. It used to make second order regression equation which serve as an objective function. That function was optimized under budget constraint and optimum value used for safety policy which shown greatest improvement in overall PSM. The outcome of this research indicates that personnel safety management model has the capability for acting as instruction tool to improve understanding of safety management and also as an aid to policy making.« less

  10. Can Civility Norms Boost Positive Effects of Management Commitment to Safety?

    PubMed

    McGonagle, Alyssa K; Childress, Niambi M; Walsh, Benjamin M; Bauerle, Timothy J

    2016-07-03

    We proposed that civility norms would strengthen relationships between management commitment to safety and workers' safety motivation, safety behaviors, and injuries. Survey data were obtained from working adults in hazardous jobs-those for which physical labor is required and/or a realistic possibility of physical injury is present (N = 290). Results showed that management commitment positively related to workers' safety motivation, safety participation, and safety compliance, and negatively related to minor injuries. Furthermore, management commitment to safety displayed a stronger positive relationship with safety motivation and safety participation, and a stronger negative relationship with minor worker injuries when civility norms were high (versus low). The results confirm existing known relationships between management commitment to safety and worker safety motivation and behavior; furthermore, civility norms facilitate the relationships between management commitment to safety and various outcomes important to worker safety. In order to promote an optimally safe working environment, managers should demonstrate a commitment to worker safety and promote positive norms for interpersonal treatment between workers in their units.

  11. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  12. On Services for Collaborative Project Management

    NASA Astrophysics Data System (ADS)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  13. General Safety and Waste Management Related to SAM

    EPA Pesticide Factsheets

    The General Safety and Waste Management page offers section-specific safety and waste management details for chemicals, radiochemicals, pathogens, and biotoxins included in EPA's Selected Analytical Methods for Environmental Remediation and Recovery (SAM).

  14. Improving the safety of remote site emergency airway management.

    PubMed

    Wijesuriya, Julian; Brand, Jonathan

    2014-01-01

    Airway management, particularly in non-theatre settings, is an area of anaesthesia and critical care associated with significant risk of morbidity & mortality, as highlighted during the 4th National Audit Project of the Royal College of Anaesthetists (NAP4). A survey of junior anaesthetists at our hospital highlighted a lack of confidence and perceived lack of safety in emergency airway management, especially in non-theatre settings. We developed and implemented a multifaceted airway package designed to improve the safety of remote site airway management. A Rapid Sequence Induction (RSI) checklist was developed; this was combined with new advanced airway equipment and drugs bags. Additionally, new carbon dioxide detector filters were procured in order to comply with NAP4 monitoring recommendations. The RSI checklists were placed in key locations throughout the hospital and the drugs and advanced airway equipment bags were centralised in the Intensive Care Unit (ICU). It was agreed with the senior nursing staff that an appropriately trained ICU nurse would attend all emergency situations with new airway resources upon request. Departmental guidelines were updated to include details of the new resources and the on-call anaesthetist's responsibilities regarding checks and maintenance. Following our intervention trainees reported higher confidence levels regarding remote site emergency airway management. Nine trusts within the Northern Region were surveyed and we found large variations in the provision of remote site airway management resources. Complications in remote site airway management due lack of available appropriate drugs, equipment or trained staff are potentially life threatening and completely avoidable. Utilising the intervention package an anaesthetist would be able to safely plan and prepare for airway management in any setting. They would subsequently have the drugs, equipment, and trained assistance required to manage any difficulties or complications

  15. The role of the ward manager in promoting patient safety.

    PubMed

    Pinnock, David

    In this article the role of the ward manager in promoting patient safety is explored. The background to the development of the patient safety agenda is briefly discussed and the relationship between quality and safety is illustrated. The pivotal importance of the role of the ward manager in delivering services to patients is underlined and literature on patient safety is examined to identify what a ward manager can do to make care safer. Possible actions of the ward manager to improve safety discussed in the literature are structured around the Leadership Framework. This framework identifies seven domains for the leadership of service delivery. Ward managers use their personal qualities, and network and work within teams, while managing performance and facilitating innovation, change and measurement for improvement. The challenge of promoting patient safety for ward managers is briefly explored and recommendations for further research are made.

  16. 46 CFR 126.480 - Safety Management Certificate.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Safety Management Certificate. 126.480 Section 126.480 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS INSPECTION AND CERTIFICATION Inspection for Certification § 126.480 Safety Management Certificate. (a) All offshore supply vessels of 500 gross tons or over to...

  17. Managing Stress. Project Seed.

    ERIC Educational Resources Information Center

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  18. 78 FR 16460 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  19. 76 FR 56363 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  20. Framework for Automation of Hazard Log Management on Large Critical Projects

    NASA Astrophysics Data System (ADS)

    Vinerbi, Lorenzo; Babu, Arun P.

    2016-08-01

    Hazard log is a database of all risk management activities in a project. Maintaining its correctness and consistency on large safety/mission critical projects involving multiple vendors, suppliers, and partners is critical and challenging. IBM DOORS is one of the popular tool used for hazard management in space applications. However, not all stake- holders are familiar with it. Also, It is not always feasible to expect all stake-holders to provide correct and consistent hazard data.The current work describes the process and tools to simplify the process of hazard data collection on large projects. It demonstrates how the collected data from all stake-holders is merged to form the hazard log while ensuring data consistency and correctness.The data provided by all parties are collected using a template containing scripts. The scripts check for mistakes based on internal standards of company in charge of hazard management. The collected data is then subjected to merging in DOORS, which also contain scripts to check and import data to form the hazard log. The proposed tool has been applied to a mission critical project, and has been found to save time and reduce the number of mistakes while creating the hazard log. The use of automatic checks paves the way for correct tracking of risk and hazard analysis activities for large critical projects.

  1. Management evolution in the LSST project

    NASA Astrophysics Data System (ADS)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  2. Applying Sensor-Based Technology to Improve Construction Safety Management.

    PubMed

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  3. [The research project: financing and management].

    PubMed

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  4. Astronomical large projects managed with MANATEE: management tool for effective engineering

    NASA Astrophysics Data System (ADS)

    García-Vargas, M. L.; Mujica-Alvarez, E.; Pérez-Calpena, A.

    2012-09-01

    This paper describes MANATEE, which is the Management project web tool developed by FRACTAL, specifically designed for managing large astronomical projects. MANATEE facilitates the management by providing an overall view of the project and the capabilities to control the three main projects parameters: scope, schedule and budget. MANATEE is one of the three tools of the FRACTAL System & Project Suite, which is composed also by GECO (System Engineering Tool) and DOCMA (Documentation Management Tool). These tools are especially suited for those Consortia and teams collaborating in a multi-discipline, complex project in a geographically distributed environment. Our Management view has been applied successfully in several projects and currently is being used for Managing MEGARA, the next instrument for the GTC 10m telescope.

  5. 76 FR 67400 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  6. I-15 integrated corridor management system : project management plan.

    DOT National Transportation Integrated Search

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...

  7. Advanced project management : training manual.

    DOT National Transportation Integrated Search

    2006-07-14

    This course identifies the principles and methodologies adopted by the Indiana Department of Transportation (INDOT) to support successful project management and delivery. Project management requires the application of knowledge, skills, tools, and te...

  8. Impact of access management practices to pedestrian safety.

    DOT National Transportation Integrated Search

    2017-03-31

    This study focused on the impact of access management practices to the safety of pedestrians. Some : of the access management practices considered to impact pedestrian safety included limiting direct : access to and from major streets, locating signa...

  9. [Structured medication management in primary care - a tool to promote medication safety].

    PubMed

    Mahler, Cornelia; Freund, Tobias; Baldauf, Annika; Jank, Susanne; Ludt, Sabine; Peters-Klimm, Frank; Haefeli, Walter Emil; Szecsenyi, Joachim

    2014-01-01

    Patients with chronic disease usually need to take multiple medications. Drug-related interactions, adverse events, suboptimal adherence, and self-medication are components that can affect medication safety and lead to serious consequences for the patient. At present, regular medication reviews to check what medicines have been prescribed and what medicines are actually taken by the patient or the structured evaluation of drug-related problems rarely take place in Germany. The process of "medication reconciliation" or "medication review" as developed in the USA and the UK aim at increasing medication safety and therefore represent an instrument of quality assurance. Within the HeiCare(®) project a structured medication management was developed for general practice, with medical assistants playing a major role in the implementation of the process. Both the structured medication management and the tools developed for the medication check and medication counselling will be outlined in this article; also, findings on feasibility and acceptance in various projects and experiences from a total of 200 general practices (56 HeiCare(®), 29 HiCMan,115 PraCMan) will be described. The results were obtained from questionnaires and focus group discussions. The implementation of a structured medication management intervention into daily routine was seen as a challenge. Due to the high relevance of medication reconciliation for daily clinical practice, however, the checklists - once implemented successfully - have been applied even after the end of the project. They have led to the regular review and reconciliation of the physicians' documentation of the medicines prescribed (medication chart) with the medicines actually taken by the patient. Copyright © 2013. Published by Elsevier GmbH.

  10. Project management practices in engineering university

    NASA Astrophysics Data System (ADS)

    Sirazitdinova, Y.; Dulzon, A.; Mueller, B.

    2015-10-01

    The article presents the analysis of usage of project management methodology in Tomsk Polytechnic University, in particular the experience with the course Project management which started 15 years ago. The article presents the discussion around advantages of project management methodology for engineering education and administration of the university in general and the problems impeding extensive implementation of this methodology in teaching, research and management in the university.

  11. Research on station management in subway operation safety

    NASA Astrophysics Data System (ADS)

    Li, Yiman

    2017-10-01

    The management of subway station is an important part of the safe operation of urban subway. In order to ensure the safety of subway operation, it is necessary to study the relevant factors that affect station management. In the protection of subway safety operations on the basis of improving the quality of service, to promote the sustained and healthy development of subway stations. This paper discusses the influencing factors of subway operation accident and station management, and analyzes the specific contents of station management security for subway operation, and develops effective suppression measures. It is desirable to improve the operational quality and safety factor for subway operations.

  12. Effects of organizational safety on employees' proactivity safety behaviors and occupational health and safety management systems in Chinese high-risk small-scale enterprises.

    PubMed

    Mei, Qiang; Wang, Qiwei; Liu, Suxia; Zhou, Qiaomei; Zhang, Jingjing

    2018-06-07

    Based on the characteristics of small-scale enterprises, the improvement of occupational health and safety management systems (OHS MS) needs an effective intervention. This study proposed a structural equation model and examined the relationships of perceived organization support for safety (POSS), person-organization safety fit (POSF) and proactivity safety behaviors with safety management, safety procedures and safety hazards identification. Data were collected from 503 employees of 105 Chinese high-risk small-scale enterprises over 6 months. The results showed that both POSS and POSF were positively related to improvement in safety management, safety procedures and safety hazards identification through proactivity safety behaviors. Our findings provide a new perspective on organizational safety for improving OHS MS for small-scale enterprises and extend the application of proactivity safety behaviors.

  13. A Study on Project Priority Evaluation Method on Road Slope Disaster Prevention Management

    NASA Astrophysics Data System (ADS)

    Sekiguchi, Nobuyasu; Ohtsu, Hiroyasu; Izu, Ryuutarou

    To improve the safety and security of driving while coping with today's stagnant economy and frequent natural disasters, road slopes should be appropriately managed. To achieve the goals, road managers should establish project priority evaluation methods for each stage of road slope management by clarifying social losses that would result by drops in service levels. It is important that road managers evaluate a project priority properly to manage the road slope effectively. From this viewpoint, this study proposed "project priority evaluation methods" in road slope disaster prevention, which use available slope information at each stage of road slope management under limited funds. In addition, this study investigated the effect of managing it from the high slope of the priority by evaluating a risk of slope failure. In terms of the amount of available information, staged information provision is needed ranging from macroscopic studies, which involves evaluation of the entire route at each stage of decision making, to semi- and microscopic investigations for evaluating slopes, and microscopic investigations for evaluating individual slopes. With limited funds, additional detailed surveys are difficult to perform. It is effective to use the slope risk assessment system, which was constructed to complement detailed data, to extract sites to perform precise investigations.

  14. Safety management in a relationship-oriented culture.

    PubMed

    Hsu, Shang Hwa; Lee, Chun-Chia

    2012-01-01

    A relationship-oriented culture predominates in the Greater China region, where it is more important than in Western countries. Some characteristics of this culture influence strongly the organizational structure and interactions among members in an organization. This study aimed to explore the possible influence of relationships on safety management in relationship-oriented cultures. We hypothesized that organizational factors (management involvement and harmonious relationships) within a relationship-oriented culture would influence supervisory work (ongoing monitoring and task instructions), the reporting system (selective reporting), and teamwork (team communication and co-ordination) in safety management at a group level, which would in turn influence individual reliance complacency, risk awareness, and practices. We distributed a safety climate questionnaire to the employees of Taiwanese high-risk industries. The results of structural equation modeling supported the hypothesis. This article also discusses the findings and implications for safety improvement in countries with a relationship-oriented culture.

  15. Applying Sensor-Based Technology to Improve Construction Safety Management

    PubMed Central

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-01-01

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions. PMID:28800061

  16. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  17. Application of Project Portfolio Management

    NASA Astrophysics Data System (ADS)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  18. Managing large energy and mineral resources (EMR) projects in challenging environments

    NASA Astrophysics Data System (ADS)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their

  19. Examining the Relationship between Safety Management System Implementation and Safety Culture in Collegiate Flight Schools

    ERIC Educational Resources Information Center

    Robertson, Mike Fuller

    2017-01-01

    Safety Management Systems (SMS) are becoming the industry standard for safety management throughout the aviation industry. As the Federal Aviation Administration (FAA) continues to mandate SMS for different segments, the assessment of an organization's safety culture becomes more important. An SMS can facilitate the development of a strong…

  20. 33 CFR 96.220 - What makes up a safety management system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false What makes up a safety management... SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.220 What makes up a safety management system? (a) The...

  1. Managing health and safety risks: Implications for tailoring health and safety management system practices.

    PubMed

    Willmer, D R; Haas, E J

    2016-01-01

    As national and international health and safety management system (HSMS) standards are voluntarily accepted or regulated into practice, organizations are making an effort to modify and integrate strategic elements of a connected management system into their daily risk management practices. In high-risk industries such as mining, that effort takes on added importance. The mining industry has long recognized the importance of a more integrated approach to recognizing and responding to site-specific risks, encouraging the adoption of a risk-based management framework. Recently, the U.S. National Mining Association led the development of an industry-specific HSMS built on the strategic frameworks of ANSI: Z10, OHSAS 18001, The American Chemistry Council's Responsible Care, and ILO-OSH 2001. All of these standards provide strategic guidance and focus on how to incorporate a plan-do-check-act cycle into the identification, management and evaluation of worksite risks. This paper details an exploratory study into whether practices associated with executing a risk-based management framework are visible through the actions of an organization's site-level management of health and safety risks. The results of this study show ways that site-level leaders manage day-to-day risk at their operations that can be characterized according to practices associated with a risk-based management framework. Having tangible operational examples of day-to-day risk management can serve as a starting point for evaluating field-level risk assessment efforts and their alignment to overall company efforts at effective risk mitigation through a HSMS or other processes.

  2. Safety cost management in construction companies: A proposal classification.

    PubMed

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  3. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  4. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  5. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  6. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  7. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  8. Safety management of complex research operators

    NASA Technical Reports Server (NTRS)

    Brown, W. J.

    1981-01-01

    Complex research and technology operations present varied potential hazards which are addressed in a disciplined, independent safety review and approval process. Potential hazards vary from high energy fuels to hydrocarbon fuels, high pressure systems to high voltage systems, toxic chemicals to radioactive materials and high speed rotating machinery to high powered lasers. A Safety Permit System presently covers about 600 potentially hazardous operations. The Safety Management Program described is believed to be a major factor in maintaining an excellent safety record.

  9. 77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...

  10. [Quality management and safety culture in medicine: context and concepts].

    PubMed

    Wischet, Werner; Eitzinger, Claudia

    2009-01-01

    The publication of the IOM report "To err is human: building a safer health system" in 1999 put spotlight on the primacy of the principle of primum non nocere and made patient safety a central topic of quality management. A key conclusion of the report was the need for a well-developed safety culture. While concepts of quality management have evolved along the lines of ISO and Total Quality Management over the last decades patient safety still has not got the same amount of attention (PubMed). Evidence from other safety-critical areas but also from the field of medicine itself suggests that an efficient culture of safety is a conditio sine qua non for the sustainable improvement of patient safety. Considering these arguments the present paper aims at emphasizing the importance of an efficient culture of safety for patient safety and quality management in healthcare. In addition, key instruments of safety culture as well as their limitations will be presented.

  11. 25 CFR 170.144 - What are eligible highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-related deaths, injuries and accidents; (j) Impaired driver initiatives; (k) Child safety seat programs... travel on IRRs, such as guardrail construction and traffic markings; (f) Development of a safety management system; (g) Education and outreach highway safety programs, such as use of child safety seats...

  12. A Qualitative Study on Certified Female Project Managers and Perceived Value of the Project Management Professional Certification

    ERIC Educational Resources Information Center

    Bozylinski, Elena

    2017-01-01

    The purpose of this phenomenological qualitative study was to explore the influence of the Project Management Professional (PMP) certification on the careers of PMP-certified female information technology project managers who are current members in a mid-Atlantic Project Management Institute chapter in the United States. The aim of this study was…

  13. Ethical issues in patient safety: Implications for nursing management.

    PubMed

    Kangasniemi, Mari; Vaismoradi, Mojtaba; Jasper, Melanie; Turunen, Hannele

    2013-12-01

    The purpose of this article is to discuss the ethical issues impacting the phenomenon of patient safety and to present implications for nursing management. Previous knowledge of this perspective is fragmented. In this discussion, the main drivers are identified and formulated in 'the ethical imperative' of patient safety. Underlying values and principles are considered, with the aim of increasing their visibility for nurse managers' decision-making. The contradictory nature of individual and utilitarian safety is identified as a challenge in nurse management practice, together with the context of shared responsibility and identification of future challenges. As a conclusion, nurse managers play a strategic role in patient safety. Their role is to incorporate ethical values of patient safety into decision-making at all levels in an organization, and also to encourage clinical nurses to consider values in the provision of care to patients. Patient safety that is sensitive to ethics provides sustainable practice where the humanity and dignity of all stakeholders are respected.

  14. A root cause analysis project in a medication safety course.

    PubMed

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  15. Financial Management: Development and Management of the Army Game Project

    DTIC Science & Technology

    2005-08-24

    Financial Management Department of Defense Office of Inspector General August 24, 2005 Development and Management of the Army Game Project (D-2005...Management of the Army Game Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Acronyms AGP Army Game Project FMR

  16. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  17. Is your organization project management savvy?

    PubMed

    Wolff, Pam

    2003-01-01

    As corporations struggle to gain better control and use of organizational resources in a rapidly changing business environment, they're finding that project management is an efficacious discipline for supporting strategic initiatives and achieving business goals. Successful project management requires an understanding of the business drivers, the organizational structure, the benefits of centralizing project management, and the factors that could impact performance.

  18. Road safety issues for bus transport management.

    PubMed

    Cafiso, Salvatore; Di Graziano, Alessandro; Pappalardo, Giuseppina

    2013-11-01

    Because of the low percentage of crashes involving buses and the assumption that public transport improves road safety by reducing vehicular traffic, public interest in bus safety is not as great as that in the safety of other types of vehicles. It is possible that less attention is paid to the significance of crashes involving buses because the safety level of bus systems is considered to be adequate. The purpose of this study was to evaluate the knowledge and perceptions of bus managers with respect to safety issues and the potential effectiveness of various technologies in achieving higher safety standards. Bus managers were asked to give their opinions on safety issues related to drivers (training, skills, performance evaluation and behaviour), vehicles (maintenance and advanced devices) and roads (road and traffic safety issues) in response to a research survey. Kendall's algorithm was used to evaluate the level of concordance. The results showed that the majority of the proposed items were considered to have great potential for improving bus safety. The data indicated that in the experience of the participants, passenger unloading and pedestrians crossing near bus stops are the most dangerous actions with respect to vulnerable users. The final results of the investigation showed that start inhibition, automatic door opening, and the materials and internal architecture of buses were considered the items most strongly related to bus passenger safety. Brake assistance and vehicle monitoring systems were also considered to be very effective. With the exception of driver assistance systems for passenger and pedestrian safety, the perceptions of the importance of other driver assistance systems for vehicle monitoring and bus safety were not unanimous among the bus company managers who participated in this survey. The study results showed that the introduction of new technologies is perceived as an important factor in improving bus safety, but a better understanding

  19. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  20. Management Of Optical Projects

    NASA Astrophysics Data System (ADS)

    Young, Peter S.; Olson, David R.

    1981-03-01

    This paper discusses the management of optical projects from the concept stage, beginning with system specifications, through design, optical fabrication and test tasks. Special emphasis is placed on effective coupling of design engineering with fabrication development and utilization of available technology. Contrasts are drawn between accepted formalized management techniques, the realities of dealing with fragile components and the necessity of an effective project team which integrates the special characteristics of highly skilled optical specialists including lens designers, optical engineers, opticians, and metrologists. Examples are drawn from the HEAO-2 X-Ray Telescope and Space Telescope projects.

  1. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  2. 75 FR 68224 - Safety Management Systems for Part 121 Certificate Holders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... the general framework for an organization-wide safety management approach to air carrier operations... System? An SMS is an organization-wide approach to managing safety risk and assuring the effectiveness of... under 14 CFR part 121 to develop and implement a safety management system (SMS) to improve the safety of...

  3. Safety Psychology Applicating on Coal Mine Safety Management Based on Information System

    NASA Astrophysics Data System (ADS)

    Hou, Baoyue; Chen, Fei

    In recent years, with the increase of intensity of coal mining, a great number of major accidents happen frequently, the reason mostly due to human factors, but human's unsafely behavior are affected by insecurity mental control. In order to reduce accidents, and to improve safety management, with the help of application security psychology, we analyse the cause of insecurity psychological factors from human perception, from personality development, from motivation incentive, from reward and punishment mechanism, and from security aspects of mental training , and put forward countermeasures to promote coal mine safety production,and to provide information for coal mining to improve the level of safety management.

  4. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  5. Safety of novel projects, the battle against Murphy's law.

    PubMed

    Schmidt, R

    2001-01-01

    With great pleasure and respect I have accepted the offer to speak in this congress. Medicine was a dream for me sometime ago and my second choice for studies. I remained with my first choice engineering and I am still happy with it; but I never forgot my love and enthusiasm for medicine. My career brought me in contact with many countries and technologies, but the development towards safety management became a dominant trend. At CERN I am a Group Leader in Matters of Safety for the Compact Muon Solenoid (CMS) experiment. In the last few years my attention has been increasingly focused on human and institutional safety aspects, besides the technical ones. My paper deals with three major topics: Safety management at CERN-CMS Murphy's law and the growing importance of institutional and human factors in safety Future outlook for safety and conclusions. In the conclusions the commonalities between different technologies become more evident as the importance of the human nature and man's role and enticement to actively and intelligently contribute to safety are presented. Based on experience and references an appeal is launched to pay more attention to the human factor in safety and recognize the rules and regularities of human behaviour in order to better combat Murphy's law.

  6. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    PubMed

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  7. Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miraglia, R.A.; Chartrand, A.W.

    1997-05-01

    The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, themore » tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.« less

  8. Implications of case managers' perceptions and attitude on safety of home-delivered care.

    PubMed

    Jones, Sarahjane

    2015-12-01

    Perceptions on safety in community care have been relatively unexplored. A project that sought to understand the multiple perspectives on safety in the NHS case-management programme was carried out in relation to the structure, process, and outcome of care. This article presents a component of the nursing perspective that highlights an important element in the structure of nursing care that could potentially impede the nurses' ability to be fully effective and safe. A single case study of the case-management programme was undertaken. Three primary care organisations from three strategic health authorities participated, and three focus groups were conducted (one within each organisation). In total, 17 case management nurses participated. Data were audiotaped and transcribed verbatim and subjected to framework analysis. Nursing staff attitudes were identified as a structure of care that influence safety outcomes, particularly their perceptions of the care setting and the implications it has on their role and patient behaviour. Greater understanding of the expected role of the community nurse is necessary, and relevant training is required for nurses to be successful in empowering patients to perform more safely. In addition, efforts need to be made to improve patients' trust in the health-care system to prevent harm and promote more effective utilisation of resources.

  9. Compendium of traffic safety research projects : 1987-1997

    DOT National Transportation Integrated Search

    1997-09-01

    The National Highway Traffic Safety Administration's (NHTSA) Research and Evaluation Division, Office of Research and Traffic Records, conducts research and evaluation projects dealing with human attitudes, behaviors, and failures (motor vehicle cras...

  10. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  11. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  12. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  13. The evolving role and care management approaches of safety-net Medicaid managed care plans.

    PubMed

    Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford

    2002-12-01

    This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.

  14. Requirements Analysis for the Army Safety Management Information System (ASMIS)

    DTIC Science & Technology

    1989-03-01

    8217_>’ Telephone Number « .. PNL-6819 Limited Distribution Requirements Analysis for the Army Safety Management Information System (ASMIS) Final...PNL-6819 REQUIREMENTS ANALYSIS FOR THE ARMY SAFETY MANAGEMENT INFORMATION SYSTEM (ASMIS) FINAL REPORT J. S. Littlefield A. L. Corrigan March...accidents. This accident data is available under the Army Safety Management Information System (ASMIS) which is an umbrella for many databases

  15. The determinants of employee participation in occupational health and safety management.

    PubMed

    Masso, Märt

    2015-01-01

    This article focuses on employee direct participation in occupational health and safety (OHS) management. The article explains what determines employee opportunities to participate in OHS management. The explanatory framework focuses on safety culture and safety management at workplaces. The framework is empirically tested using Estonian cross-sectional, multilevel data of organizations and their employees. The analysis indicates that differences in employee participation in OHS management in the Estonian case could be explained by differences in OHS management practices rather than differences in safety culture. This indicates that throughout the institutional change and shift to the European model of employment relations system, change in management practices has preceded changes in safety culture which according to theoretical argument is supposed to follow culture change.

  16. Implementation and implication of total quality management on client- contractor relationship in residential projects

    NASA Astrophysics Data System (ADS)

    Murali, Swetha; Ponmalar, V.

    2017-07-01

    To make innovation and continuous improvement as a norm, some traditional practices must become unlearnt. Change for growth and competitiveness are required for sustainability for any profitable business such as the construction industry. The leading companies are willing to implement Total Quality Management (TQM) principles, to realise potential advantages and improve growth and efficiency. Ironically, researches recollected quality as the most significant provider for competitive advantage in industrial leadership. The two objectives of this paper are 1) Identify TQM effectiveness in residential projects and 2) Identify the client satisfaction/dissatisfaction areas using Analytical Hierarchy Process (AHP) and suggest effective mitigate measures. Using statistical survey techniques like set of questionnaire survey, it is observed that total quality management was applied in some leading successful organization to an extent. The main attributes for quality achievement can be defined as teamwork and better communication with single agreed goal between client and contractor. Onsite safety is a paramount attribute in the identifying quality within the residential projects. It was noticed that the process based quality methods such as onsite safe working condition; safe management system and modern engineering process safety controls etc. as interlinked functions. Training and effective communication with all stakeholders on quality management principles is essential for effective quality work. Late Only through effective TQM principles companies can avoid some contract litigations with an increased client satisfaction Index.

  17. Human factors in safety and business management.

    PubMed

    Vogt, Joachim; Leonhardt, Jorg; Koper, Birgit; Pennig, Stefan

    2010-02-01

    Human factors in safety is concerned with all those factors that influence people and their behaviour in safety-critical situations. In aviation these are, for example, environmental factors in the cockpit, organisational factors such as shift work, human characteristics such as ability and motivation of staff. Careful consideration of human factors is necessary to improve health and safety at work by optimising the interaction of humans with their technical and social (team, supervisor) work environment. This provides considerable benefits for business by increasing efficiency and by preventing incidents/accidents. The aim of this paper is to suggest management tools for this purpose. Management tools such as balanced scorecards (BSC) are widespread instruments and also well known in aviation organisations. Only a few aviation organisations utilise management tools for human factors although they are the most important conditions in the safety management systems of aviation organisations. One reason for this is that human factors are difficult to measure and therefore also difficult to manage. Studies in other domains, such as workplace health promotion, indicate that BSC-based tools are useful for human factor management. Their mission is to develop a set of indicators that are sensitive to organisational performance and help identify driving forces as well as bottlenecks. Another tool presented in this paper is the Human Resources Performance Model (HPM). HPM facilitates the integrative assessment of human factors programmes on the basis of a systematic performance analysis of the whole system. Cause-effect relationships between system elements are defined in process models in a first step and validated empirically in a second step. Thus, a specific representation of the performance processes is developed, which ranges from individual behaviour to system performance. HPM is more analytic than BSC-based tools because HPM also asks why a certain factor is

  18. Short Duration Emergency Incidents Managed as Projects

    NASA Astrophysics Data System (ADS)

    Nixon, Thomas J.

    Emergency incidents have historically been managed by experience and some directional principles usually found in SOPs/SOGs or other pre-incident planning documents. The use of experience has the risk of bias influencing the decisions being made in truly life or death situations. Responders of disasters, long duration emergency incidents, are often equipped with a framework adapted to the project management lifecycle to assure the project priorities are adequately addressed. The disaster framework provides for savings from risk, loss, waste. This research is demonstrating the ability and reasoning to develop a framework to address short duration emergency incidents and expand the events that can be managed as a project. The research of the literature found that a framework can be applied to the project management lifecycle and the priorities of a short duration emergency incident can be managed as a project. The limitations of not having the ability to conduct empirical testing and the risks of not developing a formal implementation plan are discussed. Short duration emergency incidents are found to be capable of being managed as projects and will benefit from the effectiveness of project management methodologies.

  19. USDOT guidance summary for connected vehicle deployments : safety management.

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...

  20. Construction project management handbook.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  1. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    NASA Technical Reports Server (NTRS)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  2. Safety Risk Knowledge Elicitation in Support of Aeronautical R and D Portfolio Management: A Case Study

    NASA Technical Reports Server (NTRS)

    Shih, Ann T.; Ancel, Ersin; Jones, Sharon Monica; Reveley, Mary S.; Luxhoj, James T.

    2012-01-01

    Aviation is a problem domain characterized by a high level of system complexity and uncertainty. Safety risk analysis in such a domain is especially challenging given the multitude of operations and diverse stakeholders. The Federal Aviation Administration (FAA) projects that by 2025 air traffic will increase by more than 50 percent with 1.1 billion passengers a year and more than 85,000 flights every 24 hours contributing to further delays and congestion in the sky (Circelli, 2011). This increased system complexity necessitates the application of structured safety risk analysis methods to understand and eliminate where possible, reduce, and/or mitigate risk factors. The use of expert judgments for probabilistic safety analysis in such a complex domain is necessary especially when evaluating the projected impact of future technologies, capabilities, and procedures for which current operational data may be scarce. Management of an R&D product portfolio in such a dynamic domain needs a systematic process to elicit these expert judgments, process modeling results, perform sensitivity analyses, and efficiently communicate the modeling results to decision makers. In this paper a case study focusing on the application of an R&D portfolio of aeronautical products intended to mitigate aircraft Loss of Control (LOC) accidents is presented. In particular, the knowledge elicitation process with three subject matter experts who contributed to the safety risk model is emphasized. The application and refinement of a verbal-numerical scale for conditional probability elicitation in a Bayesian Belief Network (BBN) is discussed. The preliminary findings from this initial step of a three-part elicitation are important to project management practitioners as they illustrate the vital contribution of systematic knowledge elicitation in complex domains.

  3. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  4. Using Patient-Reported Outcome Measures (PROMs) to promote quality of care and safety in the management of patients with Advanced Chronic Kidney disease (PRO-trACK project): a mixed-methods project protocol.

    PubMed

    Aiyegbusi, Olalekan Lee; Kyte, Derek; Cockwell, Paul; Marshall, Tom; Dutton, Mary; Slade, Anita; Marklew, Neil; Price, Gary; Verdi, Rav; Waters, Judi; Sharpe, Keeley; Calvert, Melanie

    2017-06-30

    Advanced chronic kidney disease (CKD) has a major effect on the quality of life and health status of patients and requires accurate and responsive management. The use of electronic patient-reported outcome measures (ePROMs) could assist patients with advanced pre-dialysis CKD, and the clinicians responsible for their care, by identifying important changes in symptom burden in real time. We report the protocol for 'Using Patient-Reported Outcome measures (PROMs) to promote quality of care and safety in the management of patients with Advanced Chronic Kidney Disease' (PRO-trACK) project, which will explore the feasibility and validity of an ePROM system for use in patients with advanced CKD. The project will use a mixed-methods approach in three studies: (1) usability testing of the ePROM system involving up to 30 patients and focusing on acceptability and technical performance/stability; (2) ascertaining the views of patient and clinician stakeholders on the optimal use and administration of the CKD ePROM system-this will involve qualitative face-to-face/telephone interviewing with up to 30 patients or until saturation is achieved, focus groups with up to 15 clinical staff, management and IT team members; (3) psychometric assessment of the system, within a cohort of at least 180 patients with advanced CKD, to establish the measurement properties of the ePROM. This project was approved by the West Midlands Edgbaston Research Ethics Committee (Reference 17/WM/0010) and received Health Research Authority (HRA) approval on 24 February 2017.The findings from this project will be provided to clinicians at the Department of Renal Medicine, Queen Elizabeth Hospitals, Birmingham (QEHB), NHS England, presented at conferences and to the Kidney Patients' Association, British Kidney Patient Association and the British Renal Society. Articles based on the findings will be written and submitted for publication in peer-reviewed journals. © Article author(s) (or their employer

  5. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant documents...

  6. The Design of a Practical Enterprise Safety Management System

    NASA Astrophysics Data System (ADS)

    Gabbar, Hossam A.; Suzuki, Kazuhiko

    This book presents design guidelines and implementation approaches for enterprise safety management system as integrated within enterprise integrated systems. It shows new model-based safety management where process design automation is integrated with enterprise business functions and components. It proposes new system engineering approach addressed to new generation chemical industry. It will help both the undergraduate and professional readers to build basic knowledge about issues and problems of designing practical enterprise safety management system, while presenting in clear way, the system and information engineering practices to design enterprise integrated solution.

  7. Laboratory Safety and Management

    ERIC Educational Resources Information Center

    Goodenough, T. J.

    1976-01-01

    Explains a scientific approach to accident prevention and outlines the safety aspects associated with the handling of chemicals in the secondary school. Provides a check list of unsafe acts and conditions, outlines features of good laboratory management, and gives hints for combating the effects of inflation on science budgets. (GS)

  8. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  9. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  10. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  11. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  12. Scale development of safety management system evaluation for the airline industry.

    PubMed

    Chen, Ching-Fu; Chen, Shu-Chuan

    2012-07-01

    The airline industry relies on the implementation of Safety Management System (SMS) to integrate safety policies and augment safety performance at both organizational and individual levels. Although there are various degrees of SMS implementation in practice, a comprehensive scale measuring the essential dimensions of SMS is still lacking. This paper thus aims to develop an SMS measurement scale from the perspective of aviation experts and airline managers to evaluate the performance of company's safety management system, by adopting Schwab's (1980) three-stage scale development procedure. The results reveal a five-factor structure consisting of 23 items. The five factors include documentation and commands, safety promotion and training, executive management commitment, emergency preparedness and response plan and safety management policy. The implications of this SMS evaluation scale for practitioners and future research are discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.

  13. [Case Study] CityCenter and Cosmopolitan Construction Projects, Las Vegas, Nevada: lessons learned from the use of multiple sources and mixed methods in a safety needs assessment.

    PubMed

    Gittleman, Janie L; Gardner, Paige C; Haile, Elizabeth; Sampson, Julie M; Cigularov, Konstantin P; Ermann, Erica D; Stafford, Pete; Chen, Peter Y

    2010-06-01

    The present study describes a response to eight tragic deaths over an eighteen month times span on a fast track construction project on the largest commercial development project in U.S. history. Four versions of a survey were distributed to workers, foremen, superintendents, and senior management. In addition to standard Likert-scale safety climate scale items, an open-ended item was included at the end of the survey. Safety climate perceptions differed by job level. Specifically, management perceived a more positive safety climate as compared to workers. Content analysis of the open-ended item was used to identify important safety and health concerns which might have been overlooked with the qualitative portion of the survey. The surveys were conducted to understand workforce issues of concern with the aim of improving site safety conditions. Such efforts can require minimal investment of resources and time and result in critical feedback for developing interventions affecting organizational structure, management processes, and communication. The most important lesson learned was that gauging differences in perception about site safety can provide critical feedback at all levels of a construction organization. Implementation of multi-level organizational perception surveys can identify major safety issues of concern. Feedback, if acted upon, can potentially result in fewer injuries and fatal events. (c) 2010 Elsevier Ltd. All rights reserved.

  14. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  15. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    ERIC Educational Resources Information Center

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  16. The Safety Attitudes of Senior Managers in the Chinese Coal Industry.

    PubMed

    Zhang, Jiangshi; Chen, Na; Fu, Gui; Yan, Mingwei; Kim, Young-Chan

    2016-11-17

    Introduction: Senior managers' attitudes towards safety are very important regarding the safety practices in an organization. The study is to describe the current situation of senior managers' attitudes towards safety in the Chinese coal industry. Method : We evaluated the changing trends as well as the reasons for these changes in the Chinese coal industry in 2009 and in 2014 with 168 senior manager samples from large Chinese state-owned coal enterprises. Evaluations of 15 safety concepts were performed by means of a questionnaire. Results and Conclusions : Results indicate that, in 2014, three concepts were at a very high level (mean > 4.5), and six were at a relatively high level (4.5 > mean > 4.0). Analyses of changing trends revealed that nine concepts improved significantly, while four greatly declined in 2014 compared to those in 2009. The data reported here suggest that the reasons for the significant improvement with respect to the nine concepts include the improvement in social and legal environments, the improvement of the culture of social safety, workers' safety demands being met, and scientific and technical advances in the coal industry. The decline of the four concepts seemed to be caused by a poor awareness of managers in the coal industry that safety creates economic benefits, insufficient information on safety, inadequate attention to the development of a safety culture and safety management methods, and safety organizations and workers' unions not playing their role effectively. Practical Applications : We therefore recommend strengthening the evidence that safety creates economic benefits, providing incentives for employees to encourage their participation in safety management, and paying more attention to the prevention of accidents in coal mines via safety organizations and unions. These results can provide guidelines for workers, industrialists, and government regarding occupational safety in the whole coal industry.

  17. The seven habits of highly effective project managers

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Summers, Richard

    2016-08-01

    Why do some astronomy projects succeed, while others fail? There are obviously many different factors that can and do influence the outcome of any given project, but one of the most prevalent characteristics among successful projects is the combined skills and qualifications of the project manager (PM) at their helms. But this begs an obvious question: what exactly makes a project manager "skilled and qualified?" Asked another way, are there common traits, philosophies, and/or techniques that the most successful PMs share, and if so, what are they? The short answer is yes, the majority successful engineering project managers have significant skills, habits, and character traits in common. The longer answer is there are at least seven of these key traits, or "habits" that many successful PMs share and, more importantly, implement within their respective projects. This paper presents these key factors, including thoughts on scope and quality management, cost and schedule control, project team structures, risk management strategies, stakeholder management, and general project execution.

  18. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  19. 75 FR 5511 - Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...-AA00 Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's Island... replacement of the old and new approach spans of the Ben Sawyer Swing Bridge. This regulation is necessary to... proposed rulemaking (NPRM) with respect to this rule because hazards associated with the bridge replacement...

  20. Implementing local agency safety management

    DOT National Transportation Integrated Search

    2003-12-17

    For local agencies to mount a successful effort toward reducing motor vehicle collisions and their costs, an effective systematic approach must be taken. A Safety Management System (SMS) has two basic components: a collaborative information exchange ...

  1. A New Tool for Effective and Efficient Project Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willett, Jesse A

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  2. Safety management of complex research operations

    NASA Technical Reports Server (NTRS)

    Brown, W. J.

    1981-01-01

    Complex research and technology operations present many varied potential hazards which must be addressed in a disciplined independent safety review and approval process. The research and technology effort at the Lewis Research Center is divided into programmatic areas of aeronautics, space and energy. Potential hazards vary from high energy fuels to hydrocarbon fuels, high pressure systems to high voltage systems, toxic chemicals to radioactive materials and high speed rotating machinery to high powered lasers. A Safety Permit System presently covers about 600 potentially hazardous operations. The Safety Management Program described in this paper is believed to be a major factor in maintaining an excellent safety record at the Lewis Research Center.

  3. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  4. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  5. Differences in Hospital Managers', Unit Managers', and Health Care Workers' Perceptions of the Safety Climate for Respiratory Protection.

    PubMed

    Peterson, Kristina; Rogers, Bonnie M E; Brosseau, Lisa M; Payne, Julianne; Cooney, Jennifer; Joe, Lauren; Novak, Debra

    2016-07-01

    This article compares hospital managers' (HM), unit managers' (UM), and health care workers' (HCW) perceptions of respiratory protection safety climate in acute care hospitals. The article is based on survey responses from 215 HMs, 245 UMs, and 1,105 HCWs employed by 98 acute care hospitals in six states. Ten survey questions assessed five of the key dimensions of safety climate commonly identified in the literature: managerial commitment to safety, management feedback on safety procedures, coworkers' safety norms, worker involvement, and worker safety training. Clinically and statistically significant differences were found across the three respondent types. HCWs had less positive perceptions of management commitment, worker involvement, and safety training aspects of safety climate than HMs and UMs. UMs had more positive perceptions of management's supervision of HCWs' respiratory protection practices. Implications for practice improvements indicate the need for frontline HCWs' inclusion in efforts to reduce safety climate barriers and better support effective respiratory protection programs and daily health protection practices. © 2016 The Author(s).

  6. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  7. The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Risoluti, P.

    The Joint Convention on the Safety of Spent Fuel Management and the Safety of Radioactive Waste Management (the Joint Convention) is the only legally binding international treaty in the area of radioactive waste management. It was adopted by a Diplomatic Conference in September 1997 and opened for signature on 29 September 1997. The Convention entered into force on 18 June 1998, and to date (September 04) has been signed by 42 States, of which 34 have formally ratified, thus becoming Contracting Parties. The Joint Convention applies to spent fuel and radioactive waste resulting from civilian application. Its principal aim ismore » to achieve and maintain a high degree of safety in their management worldwide. The Convention is an incentive instrument, not designed to ensure fulfillment of obligations through control and sanction, but by a peer pressure. The obligations of the Contracting Parties are mainly based on the international safety standards developed by the IAEA in past decades. The Convention is intended for all countries generating radioactive waste. Therefore it is relevant not only for those using nuclear power, but for any country where application of nuclear energy in medicine, conventional industry and research is currently used. Obligations of Contracting Parties include attending periodic Review Meetings and prepare National Reports for review by the other Contracting Parties. The National Reports should describe how the country is complying with the requirements of the Articles of the Convention. The first such meeting was held at the IAEA headquarters in November 2003. This paper will describe the origin of the Convention, present its content, the expected outcome for the worldwide safety, and the benefits for a country to be part of it.« less

  8. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  9. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  10. Quality management, a directive approach to patient safety.

    PubMed

    Ayuso-Murillo, Diego; de Andrés-Gimeno, Begoña; Noriega-Matanza, Concha; López-Suárez, Rafael Jesús; Herrera-Peco, Ivan

    Nowadays the implementation of effective quality management systems and external evaluation in healthcare is a necessity to ensure not only transparency in activities related to health but also access to health and patient safety. The key to correctly implementing a quality management system is support from the managers of health facilities, since it is managers who design and communicate to health professionals the strategies of action involved in quality management systems. This article focuses on nursing managers' approach to quality management through the implementation of cycles of continuous improvement, participation of improvement groups, monitoring systems and external evaluation quality models (EFQM, ISO). The implementation of a quality management system will enable preventable adverse effects to be minimized or eliminated, and promote patient safety and safe practice by health professionals. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  11. The Art World's Concept of Negative Space Applied to System Safety Management

    NASA Technical Reports Server (NTRS)

    Goodin, James Ronald (Ronnie)

    2005-01-01

    Tools from several different disciplines can improve system safety management. This paper relates the Art World with our system safety world, showing useful art schools of thought applied to system safety management, developing an art theory-system safety bridge. This bridge is then used to demonstrate relations with risk management, the legal system, personnel management and basic management (establishing priorities). One goal of this presentation/paper is simply to be a fun diversion from the many technical topics presented during the conference.

  12. [Managment system in safety and health at work organization. An Italian example in public sector: Inps].

    PubMed

    Di Loreto, G; Felicioli, G

    2010-01-01

    The Istituto Nazionale della Previdenza Sociale (Inps) is one of the biggest Public Sector organizations in Italy; about 30.000 people work in his structures. Fifteen years ago, Inps launched a long term project with the objective to create a complex and efficient safety and health at work organization. Italian law contemplates a specific kind of physician working on safety and health at work, called "Medico competente", and 85 Inps's physicians work also as "Medico competente". This work describes how IT improved coordination and efficiency in this occupational health's management system.

  13. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  14. Analysis of interactions among barriers in project risk management

    NASA Astrophysics Data System (ADS)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  15. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  16. Operating room data management: improving efficiency and safety in a surgical block.

    PubMed

    Agnoletti, Vanni; Buccioli, Matteo; Padovani, Emanuele; Corso, Ruggero M; Perger, Peter; Piraccini, Emanuele; Orelli, Rebecca Levy; Maitan, Stefano; Dell'amore, Davide; Garcea, Domenico; Vicini, Claudio; Montella, Teresa Maria; Gambale, Giorgio

    2013-03-11

    European Healthcare Systems are facing a difficult period characterized by increasing costs and spending cuts due to economic problems. There is the urgent need for new tools which sustain Hospitals decision makers work. This project aimed to develop a data recording system of the surgical process of every patient within the operating theatre. The primary goal was to create a practical and easy data processing tool to give hospital managers, anesthesiologists and surgeons the information basis to increase operating theaters efficiency and patient safety. The developed data analysis tool is embedded in an Oracle Business Intelligence Environment, which processes data to simple and understandable performance tachometers and tables. The underlying data analysis is based on scientific literature and the projects teams experience with tracked data. The system login is layered and different users have access to different data outputs depending on their professional needs. The system is divided in the tree profile types Manager, Anesthesiologist and Surgeon. Every profile includes subcategories where operators can access more detailed data analyses. The first data output screen shows general information and guides the user towards more detailed data analysis. The data recording system enabled the registration of 14.675 surgical operations performed from 2009 to 2011. Raw utilization increased from 44% in 2009 to 52% in 2011. The number of high complexity surgical procedures (≥120 minutes) has increased in certain units while decreased in others. The number of unscheduled procedures performed has been reduced (from 25% in 2009 to 14% in 2011) while maintaining the same percentage of surgical procedures. The number of overtime events decreased in 2010 (23%) and in 2011 (21%) compared to 2009 (28%) and the delays expressed in minutes are almost the same (mean 78 min). The direct link found between the complexity of surgical procedures, the number of unscheduled procedures

  17. Operating room data management: improving efficiency and safety in a surgical block

    PubMed Central

    2013-01-01

    Background European Healthcare Systems are facing a difficult period characterized by increasing costs and spending cuts due to economic problems. There is the urgent need for new tools which sustain Hospitals decision makers work. This project aimed to develop a data recording system of the surgical process of every patient within the operating theatre. The primary goal was to create a practical and easy data processing tool to give hospital managers, anesthesiologists and surgeons the information basis to increase operating theaters efficiency and patient safety. Methods The developed data analysis tool is embedded in an Oracle Business Intelligence Environment, which processes data to simple and understandable performance tachometers and tables. The underlying data analysis is based on scientific literature and the projects teams experience with tracked data. The system login is layered and different users have access to different data outputs depending on their professional needs. The system is divided in the tree profile types Manager, Anesthesiologist and Surgeon. Every profile includes subcategories where operators can access more detailed data analyses. The first data output screen shows general information and guides the user towards more detailed data analysis. The data recording system enabled the registration of 14.675 surgical operations performed from 2009 to 2011. Results Raw utilization increased from 44% in 2009 to 52% in 2011. The number of high complexity surgical procedures (≥120 minutes) has increased in certain units while decreased in others. The number of unscheduled procedures performed has been reduced (from 25% in 2009 to 14% in 2011) while maintaining the same percentage of surgical procedures. The number of overtime events decreased in 2010 (23%) and in 2011 (21%) compared to 2009 (28%) and the delays expressed in minutes are almost the same (mean 78 min). The direct link found between the complexity of surgical procedures, the number

  18. Project nurse manager: an intrapreneurial role.

    PubMed

    Risner, P B; Anderson, M L

    1994-01-01

    Nurse intrapreneurs are the key to innovation and cost-effective health care in the 1990s. A project nurse manager, acting as a liaison between service departments, can provide the vision and insight for the successful outcome of such projects as product evaluation, unit renovation, and the development of a new facility. The role, benefits, and outcomes of one project nurse manager are described.

  19. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  20. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  1. SWARMS Early Trials Management for The SWARMs ECSEL-H2020 Project

    NASA Astrophysics Data System (ADS)

    Alcaraz, Daniel; Morales, Tania; Castro, Ayoze; Barrera, Carlos; Hernández, Joaquín; Llinás, Octavio

    2017-04-01

    The work presented on this paper is aimed to explain how the Early Trials of the Project SWARMS were managed in order to complete the first field demonstrations on real environment. SWARMs aims to reduce the operational cost in the use of maritime robots and vehicles, in order to increase the safety of tasks and reduce profesional divers risks. This will be achieved enabling the AUVs/ROVs to work in a cooperative mesh. The challenge is to design and develop an integrated platform (a set of Software/Hardware components), incorporated into the current generation of underwater vehicles in order to improve autonomy, cooperation, robustness, cost-effectiveness, and reliability of the offshore operations. The first demonstration of the project has been performed at PLOCAN (The Oceanic Platform of the Canary Islands) where these technologies were validated on its first stage. The Early Trials have represented the first in situ deployment and test of the novel technologies developed during the initial 14 months of the Project. Going into the sea supposed a huge challenge also in terms of management. The 32 partners of SWARMS had very different requirements (logistics, technical needs, software/computation needs, etc.), and a limited time frame to test and prove their individual developments. In order to fullfill the project objectives, all these tests were divided in 7 missions that were aimed to cover this early demonstration requiements. From PLOCAN, a management protocol was designed in order to cover all the partners needs and make an efficient resource asignment from the begining. These results will be extended to other two demonstrations of the project that forseen to be held in Romania (2017) and Norway (2018).

  2. Intranet-based safety documentation in management of major hazards and occupational health and safety.

    PubMed

    Leino, Antti

    2002-01-01

    In the European Union, Council Directive 96/82/EC requires operators producing, using, or handling significant amounts of dangerous substances to improve their safety management systems in order to better manage the major accident potentials deriving from human error. A new safety management system for the Viikinmäki wastewater treatment plant in Helsinki, Finland, was implemented in this study. The system was designed to comply with both the new safety liabilities and the requirements of OHSAS 18001 (British Standards Institute, 1999). During the implementation phase experiences were gathered from the development processes in this small organisation. The complete documentation was placed in the intranet of the plant. Hyperlinks between documents were created to ensure convenience of use. Documentation was made accessible for all workers from every workstation.

  3. The Perception, Level of Safety Satisfaction and Safety Feedback on Occupational Safety and Health Management among Hospital Staff Nurses in Sabah State Health Department.

    PubMed

    Cheah, Whye Lian; Giloi, Nelbon; Chang, Ching Thon; Lim, Jac Fang

    2012-07-01

    This study aimed to determine the perception and level of safety satisfaction of staff nurses with regards to Occupational Safety and Health (OSH) management practice in the Sabah Health Department, and to associate the OSH management dimensions, to Safety Satisfaction and Safety Feedback. A cross-sectional study using a validated self-administered questionnaire was conducted among randomly respondents. 135 nurses responded the survey. Mean (SD) score for each dimension ranged from 1.70 ± 0.68-4.04 ± 0.65, with Training and Competence dimension (mean [SD], 4.04 ± 0.65) had the highest while Safety Incidence was the least score (mean [SD], 1.70 ± 0.68). Both mean (SD) scores for Safety Satisfaction and Safety Feedback was high, 3.28 ± 0.51 and 3.57 ± 0.73, respectively. Pearson's correlation analysis indicated that all OSH dimensions had significant correlation with Safety Satisfaction and Safety Feedback (r coefficient ranged from 0.176-0.512) except for Safety Incidence. The overall perception of OSH management was rather low. Significant correlation between Safety Satisfaction and Safety Feedback and several dimensions, suggest that each organization to put in place the leaders who have appropriate leadership and supervisory skills and committed in providing staff training to improve staff's competency in OSH practice. In addition, clear goals, rules, and reporting system will help the organization to implement proper OSH management practice.

  4. The Joint Convention on the Safety of Spent fuel Management and on the safety of Radioactive Waste Management: A UK Regulator's Perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lacey, D.; Bacon, M.L.

    The UK fully supports the objective of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management to achieve and maintain a high level of safety worldwide in spent fuel and radioactive waste management, through the enhancement of national measures and international co-operation, including where appropriate, safety-related co-operation. The UK's Health and Safety Executive, through its Nuclear Safety Directorate (NSD), has been committed to the Convention since the initial negotiations to set up the Convention and provided the president of the first review meeting in 2003. It would be wrong of anymore » nation to believe that they have all the best solutions to managing spent fuel and radioactive waste. The process of compiling reports for the Convention review meetings provides a structured process through which every contracting party can review its provisions against a common set of standards and identify for itself possible areas of improvements. The sharing of reports and the asking and answering of questions then provides a further opportunity for both sharing of experience and learning. The UK was encouraged by the spirit of constructive discussion rather than negative criticism that pervaded the first review meeting that provided an incentive for all to learn and improve. While, as could be expected of the first meeting of such a group, not everything worked as well as could be hoped for, all parties seemed committed to learn from mistakes and to make the process more effective. Lessons were learned from the Nuclear Safety Convention on the process of submitting reports electronically and the UK actively supported aims to use IAEA requirements documents as an additional focus for reports. This should, we hope, provide for even better benchmarking of achievements and provide feedback for improvements of the IAEA requirements where appropriate. In summary, the UK finds the Joint Convention process to be a

  5. Safety management of a complex R&D ground operating system

    NASA Technical Reports Server (NTRS)

    Connors, J. F.; Maurer, R. A.

    1975-01-01

    A perspective on safety program management has been developed for a complex R&D operating system, such as the NASA-Lewis Research Center. Using a systems approach, hazardous operations are subjected to third-party reviews by designated area safety committees and are maintained under safety permit controls. To insure personnel alertness, emergency containment forces and employees are trained in dry-run emergency simulation exercises. The keys to real safety effectiveness are top management support and visibility of residual risks.

  6. A case for safety leadership team training of hospital managers.

    PubMed

    Singer, Sara J; Hayes, Jennifer; Cooper, Jeffrey B; Vogt, Jay W; Sales, Michael; Aristidou, Angela; Gray, Garry C; Kiang, Mathew V; Meyer, Gregg S

    2011-01-01

    Delivering safe patient care remains an elusive goal. Resolving problems in complex organizations like hospitals requires managers to work together. Safety leadership training that encourages managers to exercise learning-oriented, team-based leadership behaviors could promote systemic problem solving and enhance patient safety. Despite the need for such training, few programs teach multidisciplinary groups of managers about specific behaviors that can enhance their role as leadership teams in the realm of patient safety. The aims of this study were to describe a learning-oriented, team-based, safety leadership training program composed of reinforcing exercises and to provide evidence confirming the need for such training and demonstrating behavior change among management groups after training. Twelve groups of managers from an academic medical center based in the Northeast United States were randomly selected to participate in the program and exposed to its customized, experience-based, integrated, multimodal curriculum. We extracted data from transcripts of four training sessions over 15 months with groups of managers about the need for the training in these groups and change in participants' awareness, professional behaviors, and group activity. Training transcripts confirmed the need for safety leadership team training and provided evidence of the potential for training to increase targeted behaviors. The training increased awareness and use of leadership behaviors among many managers and led to new routines and coordinated effort among most management groups. Enhanced learning-oriented leadership often helped promote a learning orientation in managers' work areas. Team-based training that promotes specific learning-oriented leader behaviors can promote behavioral change among multidisciplinary groups of hospital managers.

  7. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  8. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry

    PubMed Central

    Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-01-01

    Background The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. Results The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Conclusion Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection. PMID:24422176

  9. Effect of Occupational Health and Safety Management System on Work-Related Accident Rate and Differences of Occupational Health and Safety Management System Awareness between Managers in South Korea's Construction Industry.

    PubMed

    Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua

    2013-12-01

    The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.

  10. Food Safety Crisis Management-A Comparison between Germany and the Netherlands.

    PubMed

    van Asselt, E D; van der Fels-Klerx, H J; Breuer, O; Helsloot, I

    2017-02-01

    In order to prevent food safety incidents from becoming a crisis, a good crisis management structure is essential. The aim of the current study was to compare and evaluate the national food incident response plans of 2 neighboring EU Member States: Germany and the Netherlands. This revealed that the structure of these plans is comparable, starting with initial alerting, assessment of the problem, upscaling, an execution phase and finally an evaluation of the crisis management. However, the German communication structure is more complex than the Dutch one and cross-border communication between both countries is currently limited. In general, the presence of national response plans does not guarantee a good and swift response to a food safety incident as this is often hampered by difficulties in tracing the source of the problem as well as difficulties in communication between organizations involved in crisis management. A timely detection can be improved through the development of fast screening and detecting systems and through combining various data sources using computer software systems. Mutual cooperation and communication can be improved through joint exercises or projects. This will help to streamline communication toward consumers and trade partners. Such communication should be transparent relaying not only the facts but also the uncertainties in a crisis in order to gain consumer trust and safeguard international trade. © 2017 Institute of Food Technologists®.

  11. Advanced Test Reactor Safety Basis Upgrade Lessons Learned Relative to Design Basis Verification and Safety Basis Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. L. Sharp; R. T. McCracken

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR

  12. 23 CFR 630.1012 - Project-level procedures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...

  13. 23 CFR 630.1012 - Project-level procedures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...

  14. 23 CFR 630.1012 - Project-level procedures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...

  15. 23 CFR 630.1012 - Project-level procedures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...

  16. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  17. Behavior-Based Safety and Occupational Risk Management

    ERIC Educational Resources Information Center

    Geller, E. Scott

    2005-01-01

    The behavior-based approach to managing occupational risk and preventing workplace injuries is reviewed. Unlike the typical top-down control approach to industrial safety, behavior-based safety (BBS) provides tools and procedures workers can use to take personal control of occupational risks. Strategies the author and his colleagues have been…

  18. 46 CFR 115.925 - Safety Management Certificate.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Safety Management Certificate. 115.925 Section 115.925 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS INSPECTION AND CERTIFICATION International Convention for Safety...

  19. Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

    NASA Technical Reports Server (NTRS)

    Michaels, Jeffrey

    1994-01-01

    These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

  20. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  1. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  2. 33 CFR 96.230 - What objectives must a safety management system meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management system meet? 96.230 Section 96.230 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.230 What objectives must a safety...

  3. [Patient safety in management contracts].

    PubMed

    Campillo-Artero, C

    2012-01-01

    Patient safety is becoming commonplace in management contracts. Since our experience in patient safety still falls short of other clinical areas, it is advisable to review some of its characteristics in order to improve its inclusion in these contracts. In this paper opinions and recommendations concerning the design and review of contractual clauses on safety are given, as well as reflections drawn from methodological papers and informal opinions of clinicians, who are most familiar with the nuances of safe and unsafe practices. After reviewing some features of these contracts, criteria for prioritizing and including safety objectives and activities in them, and key points for their evaluation are described. The need to replace isolated activities by systemic and multifaceted ones is emphasized. Errors, limitations and improvement opportunities observed when contracts are linked to indicators, information and adverse event reporting systems are analysed. Finally, the influence of the rules of the game, and clinicians behaviour are emphasised. Copyright © 2011 SECA. Published by Elsevier Espana. All rights reserved.

  4. Evaluation of Safety, Quality and Productivity in Construction

    NASA Astrophysics Data System (ADS)

    Usmen, M. A.; Vilnitis, M.

    2015-11-01

    This paper examines the success indicators of construction projects, safety, quality and productivity, in terms of their implications and impacts during and after construction. First safety is considered during construction with a focus on hazard identification and the prevention of occupational accidents and injuries on worksites. The legislation mandating safety programs, training and compliance with safety standards is presented and discussed. Consideration of safety at the design stage is emphasized. Building safety and the roles of building codes in prevention of structural failures are also covered in the paper together with factors affecting building failures and methods for their prevention. Quality is introduced in the paper from the perspective of modern total quality management. Concepts of quality management, quality control, quality assurance and Six Sigma and how they relate to building quality and structural integrity are discussed with examples. Finally, productivity concepts are presented with emphasis on effective project management to minimize loss of productivity, complimented by lean construction and lean Six Sigma principles. The paper concludes by synthesizing the relationships between safety, quality and productivity.

  5. Augmenting SCA project management and automation framework

    NASA Astrophysics Data System (ADS)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  6. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  7. The Perception, Level of Safety Satisfaction and Safety Feedback on Occupational Safety and Health Management among Hospital Staff Nurses in Sabah State Health Department

    PubMed Central

    Cheah, Whye Lian; Giloi, Nelbon; Chang, Ching Thon; Lim, Jac Fang

    2012-01-01

    Background: This study aimed to determine the perception and level of safety satisfaction of staff nurses with regards to Occupational Safety and Health (OSH) management practice in the Sabah Health Department, and to associate the OSH management dimensions, to Safety Satisfaction and Safety Feedback. Methods: A cross-sectional study using a validated self-administered questionnaire was conducted among randomly respondents. Results: 135 nurses responded the survey. Mean (SD) score for each dimension ranged from 1.70 ± 0.68–4.04 ± 0.65, with Training and Competence dimension (mean [SD], 4.04 ± 0.65) had the highest while Safety Incidence was the least score (mean [SD], 1.70 ± 0.68). Both mean (SD) scores for Safety Satisfaction and Safety Feedback was high, 3.28 ± 0.51 and 3.57 ± 0.73, respectively. Pearson’s correlation analysis indicated that all OSH dimensions had significant correlation with Safety Satisfaction and Safety Feedback (r coefficient ranged from 0.176–0.512) except for Safety Incidence. Conclusion: The overall perception of OSH management was rather low. Significant correlation between Safety Satisfaction and Safety Feedback and several dimensions, suggest that each organization to put in place the leaders who have appropriate leadership and supervisory skills and committed in providing staff training to improve staff’s competency in OSH practice. In addition, clear goals, rules, and reporting system will help the organization to implement proper OSH management practice. PMID:23610550

  8. Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine, Volume 11, March 2003

    NASA Technical Reports Server (NTRS)

    2003-01-01

    APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. Contributors to this issue include: Teresa Bailey, a librarian at the Jet Propulsion Laboratory, Roy Malone, Deputy Director in the Safety and Mission Assurance (S&MA) Office at the NASA Marshall Space Flight Center (MSFC), W. Scott Cameron, Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble, Ray Morgan, recent retiree as Vice President of AeroVironment, Inc., Marty Davis, Program Manager of the Geostationary Operational Environmental Satellite (GOES) at the NASA Goddard Space Flight Center (GSFC) in Greenbelt, Maryland, Todd Post, editor of ASK Magazine, and works for EduTech Ltd. in Silver Spring, Maryland, Dr. Owen Gadeken, professor of Engineering Management at the Defense Acquisition University, Ken Schwer, currently the Project Manager of Solar Dynamics Observatory, Dr. Edward Hoffmwan, Director of the NASA Academy of Program and Project Leadership, Frank Snow, a member of the NASA Explorer Program at Goddard Space Flight Center since 1992, Dr. Alexander Laufer, Editor-in-Chief of ASK Magazine and a member of the Advisory Board of the NASA Academy of Program and Project Leadership, Judy Stokley, presently Air Force Program Executive Officer for Weapons in Washington, D.C. and Terry Little, Director of the Kinetic

  9. Quality of Project Management Education and Training Programmes

    NASA Astrophysics Data System (ADS)

    Bodea, Constanta-Nicoleta; Dascalu, Maria; Coman, Melania

    The paper refers to the factors which influence the quality of training and education on project management. A survey was made and the main results are presented. 81 % of the responses came from China. The rest were professionals of different EU nationalities. The percentage of Project Managers who answered the questions is rather low - 8%. In the "Others" category, we have software developers, financial managers and professors, who are involved in both training on project management, but also as team members or team managers in projects, thus ensuring a balanced overview of both theory and practical issues.

  10. Software Safety Risk in Legacy Safety-Critical Computer Systems

    NASA Technical Reports Server (NTRS)

    Hill, Janice L.; Baggs, Rhoda

    2007-01-01

    Safety Standards contain technical and process-oriented safety requirements. Technical requirements are those such as "must work" and "must not work" functions in the system. Process-Oriented requirements are software engineering and safety management process requirements. Address the system perspective and some cover just software in the system > NASA-STD-8719.13B Software Safety Standard is the current standard of interest. NASA programs/projects will have their own set of safety requirements derived from the standard. Safety Cases: a) Documented demonstration that a system complies with the specified safety requirements. b) Evidence is gathered on the integrity of the system and put forward as an argued case. [Gardener (ed.)] c) Problems occur when trying to meet safety standards, and thus make retrospective safety cases, in legacy safety-critical computer systems.

  11. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  12. Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success

    NASA Astrophysics Data System (ADS)

    Perera, Jeevan; Holsomback, Jerry D.

    2005-12-01

    Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate

  13. Managing risk in healthcare: understanding your safety culture using the Manchester Patient Safety Framework (MaPSaF).

    PubMed

    Parker, Dianne

    2009-03-01

    To provide sufficient information about the Manchester Patient Safety Framework (MaPSaF) to allow healthcare professionals to assess its potential usefulness. The assessment of safety culture is an important aspect of risk management, and one in which there is increasing interest among healthcare organizations. Manchester Patient Safety Framework offers a theory-based framework for assessing safety culture, designed specifically for use in the NHS. The framework covers multiple dimensions of safety culture, and five levels of safety culture development. This allows the generation of a profile of an organization's safety culture in terms of areas of relative strength and challenge, which can be used to identify focus issues for change and improvement. Manchester Patient Safety Framework provides a useful method for engaging healthcare professionals in assessing and improving the safety culture in their organization, as part of a programme of risk management.

  14. CSHM: Web-based safety and health monitoring system for construction management.

    PubMed

    Cheung, Sai On; Cheung, Kevin K W; Suen, Henry C H

    2004-01-01

    This paper describes a web-based system for monitoring and assessing construction safety and health performance, entitled the Construction Safety and Health Monitoring (CSHM) system. The design and development of CSHM is an integration of internet and database systems, with the intent to create a total automated safety and health management tool. A list of safety and health performance parameters was devised for the management of safety and health in construction. A conceptual framework of the four key components of CSHM is presented: (a) Web-based Interface (templates); (b) Knowledge Base; (c) Output Data; and (d) Benchmark Group. The combined effect of these components results in a system that enables speedy performance assessment of safety and health activities on construction sites. With the CSHM's built-in functions, important management decisions can theoretically be made and corrective actions can be taken before potential hazards turn into fatal or injurious occupational accidents. As such, the CSHM system will accelerate the monitoring and assessing of performance safety and health management tasks.

  15. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  16. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  17. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  18. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. Project Manager Personality as a Factor for Success

    DTIC Science & Technology

    2008-03-01

    the project manager includes planning , 1 organizing, directing, and controlling the project (Program Management Institute, 2004; Kerzner, 2006). By...programs identified 5 percent cost growth per year from 2004 to 2007, costing $165 billion dollars more than originally planned (United States...Bjeirmi, 1996) and point out that good project managers can "contribute to project success, but are unlikely to prevent failure" ( de Witt, 1988, p

  5. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  6. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  7. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  8. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  9. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  10. ICT and mobile health to improve clinical process delivery. a research project for therapy management process innovation.

    PubMed

    Locatelli, Paolo; Montefusco, Vittorio; Sini, Elena; Restifo, Nicola; Facchini, Roberta; Torresani, Michele

    2013-01-01

    The volume and the complexity of clinical and administrative information make Information and Communication Technologies (ICTs) essential for running and innovating healthcare. This paper tells about a project aimed to design, develop and implement a set of organizational models, acknowledged procedures and ICT tools (Mobile & Wireless solutions and Automatic Identification and Data Capture technologies) to improve actual support, safety, reliability and traceability of a specific therapy management (stem cells). The value of the project is to design a solution based on mobile and identification technology in tight collaboration with physicians and actors involved in the process to ensure usability and effectivenes in process management.

  11. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  12. IS-ENES project management - lessons learnt

    NASA Astrophysics Data System (ADS)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  13. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section onmore » establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.« less

  14. Health and Safety Management for Small-scale Methane Fermentation Facilities

    NASA Astrophysics Data System (ADS)

    Yamaoka, Masaru; Yuyama, Yoshito; Nakamura, Masato; Oritate, Fumiko

    In this study, we considered health and safety management for small-scale methane fermentation facilities that treat 2-5 ton of biomass daily based on several years operation experience with an approximate capacity of 5 t·d-1. We also took account of existing knowledge, related laws and regulations. There are no qualifications or licenses required for management and operation of small-scale methane fermentation facilities, even though rural sewerage facilities with a relative similar function are required to obtain a legitimate license. Therefore, there are wide variations in health and safety consciousness of the operators of small-scale methane fermentation facilities. The industrial safety and health laws are not applied to the operation of small-scale methane fermentation facilities. However, in order to safely operate a small-scale methane fermentation facility, the occupational safety and health management system that the law recommends should be applied. The aims of this paper are to clarify the risk factors in small-scale methane fermentation facilities and encourage planning, design and operation of facilities based on health and safety management.

  15. National Machine Guarding Program: Part 2. Safety management in small metal fabrication enterprises.

    PubMed

    Parker, David L; Yamin, Samuel C; Brosseau, Lisa M; Xi, Min; Gordon, Robert; Most, Ivan G; Stanley, Rodney

    2015-11-01

    Small manufacturing businesses often lack important safety programs. Many reasons have been set forth on why this has remained a persistent problem. The National Machine Guarding Program (NMGP) was a nationwide intervention conducted in partnership with two workers' compensation insurers. Insurance safety consultants collected baseline data in 221 business using a 33-question safety management audit. Audits were completed during an interview with the business owner or manager. Most measures of safety management improved with an increasing number of employees. This trend was particularly strong for lockout/tagout. However, size was only significant for businesses without a safety committee. Establishments with a safety committee scored higher (55% vs. 36%) on the safety management audit compared with those lacking a committee (P < 0.0001). Critical safety management programs were frequently absent. A safety committee appears to be a more important factor than business size in accounting for differences in outcome measures. © 2015 The Authors. American Journal of Industrial Medicine Published by Wiley Periodicals, Inc.

  16. Good practices : incorporating safety into resurfacing and restoration projects

    DOT National Transportation Integrated Search

    2006-12-01

    Integrating safety improvements into resurfacing and restoration projects is a subject of long-standing interest by Federal, State, and local transportation agencies. A Scan Tour was conducted to identify and subsequently observe good practices in th...

  17. 30 CFR 585.810 - What must I include in my Safety Management System?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., COPs and GAPs Safety Management Systems § 585.810 What must I include in my Safety Management System? You must submit a description of the Safety Management System you will use with your COP (provided...

  18. 30 CFR 585.810 - What must I include in my Safety Management System?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., COPs and GAPs Safety Management Systems § 585.810 What must I include in my Safety Management System? You must submit a description of the Safety Management System you will use with your COP (provided...

  19. 30 CFR 585.810 - What must I include in my Safety Management System?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., COPs and GAPs Safety Management Systems § 585.810 What must I include in my Safety Management System? You must submit a description of the Safety Management System you will use with your COP (provided...

  20. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  1. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  2. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  3. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  4. Towards integrated hygiene and food safety management systems: the Hygieneomic approach.

    PubMed

    Armstrong, G D

    1999-09-15

    Integrated hygiene and food safety management systems in food production can give rise to exceptional improvements in food safety performance, but require high level commitment and full functional involvement. A new approach, named hygieneomics, has been developed to assist management in their introduction of hygiene and food safety systems. For an effective introduction, the management systems must be designed to fit with the current generational state of an organisation. There are, broadly speaking, four generational states of an organisation in their approach to food safety. They comprise: (i) rules setting; (ii) ensuring compliance; (iii) individual commitment; (iv) interdependent action. In order to set up an effective integrated hygiene and food safety management system a number of key managerial requirements are necessary. The most important ones are: (a) management systems must integrate the activities of key functions from research and development through to supply chain and all functions need to be involved; (b) there is a critical role for the senior executive, in communicating policy and standards; (c) responsibilities must be clearly defined, and it should be clear that food safety is a line management responsibility not to be delegated to technical or quality personnel; (d) a thorough and effective multi-level audit approach is necessary; (e) key activities in the system are HACCP and risk management, but it is stressed that these are ongoing management activities, not once-off paper generating exercises; and (f) executive management board level review is necessary of audit results, measurements, status and business benefits.

  5. Economic Techniques of Occupational Health and Safety Management

    NASA Astrophysics Data System (ADS)

    Sidorov, Aleksandr I.; Beregovaya, Irina B.; Khanzhina, Olga A.

    2016-10-01

    The article deals with the issues on economic techniques of occupational health and safety management. Authors’ definition of safety management is given. It is represented as a task-oriented process to identify, establish and maintain such a state of work environment in which there are no possible effects of hazardous and harmful factors, or their influence does not go beyond certain limits. It was noted that management techniques that are the part of the control mechanism, are divided into administrative, organizational and administrative, social and psychological and economic. The economic management techniques are proposed to be classified depending on the management subject, management object, in relation to an enterprise environment, depending on a control action. Technoeconomic study, feasibility study, planning, financial incentives, preferential crediting of enterprises, pricing, profit sharing and equity, preferential tax treatment for enterprises, economic regulations and standards setting have been distinguished as economic techniques.

  6. 76 FR 35130 - Pipeline Safety: Control Room Management/Human Factors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration 49 CFR Parts...: Control Room Management/Human Factors AGENCY: Pipeline and Hazardous Materials Safety Administration... safety standards, risk assessments, and safety policies for natural gas pipelines and for hazardous...

  7. A study for safety and health management problem of semiconductor industry in Taiwan.

    PubMed

    Chao, Chin-Jung; Wang, Hui-Ming; Feng, Wen-Yang; Tseng, Feng-Yi

    2008-12-01

    The main purpose of this study is to discuss and explore the safety and health management in semiconductor industry. The researcher practically investigates and interviews the input, process and output of the safety and health management of semiconductor industry by using the questionnaires and the interview method which is developed according to the framework of the OHSAS 18001. The result shows that there are six important factors for the safety and health management in Taiwan semiconductor industry. 1. The company should make employee clearly understand the safety and health laws and standards. 2. The company should make the safety and health management policy known to the public. 3. The company should put emphasis on the pursuance of the safety and health management laws. 4. The company should prevent the accidents. 5. The safety and health message should be communicated sufficiently. 6. The company should consider safety and health norm completely.

  8. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  9. Total Quality Management and the System Safety Secretary

    NASA Technical Reports Server (NTRS)

    Elliott, Suzan E.

    1993-01-01

    The system safety secretary is a valuable member of the system safety team. As downsizing occurs to meet economic constraints, the Total Quality Management (TQM) approach is frequently adopted as a formula for success and, in some cases, for survival.

  10. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  11. The influence of environmental conditions on safety management in hospitals: a qualitative study.

    PubMed

    Alingh, Carien W; van Wijngaarden, Jeroen D H; Huijsman, Robbert; Paauwe, Jaap

    2018-05-02

    Hospitals are confronted with increasing safety demands from a diverse set of stakeholders, including governmental organisations, professional associations, health insurance companies, patient associations and the media. However, little is known about the effects of these institutional and competitive pressures on hospital safety management. Previous research has shown that organisations generally shape their safety management approach along the lines of control- or commitment-based management. Using a heuristic framework, based on the contextually-based human resource theory, we analysed how environmental pressures affect the safety management approach used by hospitals. A qualitative study was conducted into hospital care in the Netherlands. Five hospitals were selected for participation, based on organisational characteristics as well as variation in their reputation for patient safety. We interviewed hospital managers and staff with a central role in safety management. A total of 43 semi-structured interviews were conducted with 48 respondents. The heuristic framework was used as an initial model for analysing the data, though new codes emerged from the data as well. In order to ensure safe care delivery, institutional and competitive stakeholders often impose detailed safety requirements, strong forces for compliance and growing demands for accountability. As a consequence, hospitals experience a decrease in the room to manoeuvre. Hence, organisations increasingly choose a control-based management approach to make sure that safety demands are met. In contrast, in case of more abstract safety demands and an organisational culture which favours patient safety, hospitals generally experience more leeway. This often results in a stronger focus on commitment-based management. Institutional and competitive conditions as well as strategic choices that hospitals make have resulted in various combinations of control- and commitment-based safety management. A balanced

  12. Joint road safety operations in tunnels and open roads

    NASA Astrophysics Data System (ADS)

    Adesiyun, Adewole; Avenoso, Antonio; Dionelis, Kallistratos; Cela, Liljana; Nicodème, Christophe; Goger, Thierry; Polidori, Carlo

    2017-09-01

    The objective of the ECOROADS project is to overcome the barrier established by the formal interpretation of the two Directives 2008/96/EC and 2004/54/EC, which in practice do not allow the same Road Safety Audits/Inspections to be performed inside tunnels. The projects aims at the establishment of a common enhanced approach to road infrastructure and tunnel safety management by using the concepts and criteria of the Directive 2008/96/CE on road infrastructure safety management and the results of related European Commission (EC) funded projects. ECOROADS has already implemented an analysis of national practices regarding Road Safety Inspections (RSI), two Workshops with the stakeholders, and an exchange of best practices between European tunnel experts and road safety professionals, which led to the definition of common agreed safety procedures. In the second phase of the project, different groups of experts and observers applied the above common procedures by inspecting five European road sections featuring both open roads and tunnels in Belgium, Albania, Germany, Serbia and Former Yugoslav Republic of Macedonia. This paper shows the feedback of the 5 joint safety operations and how they are being used for a set of - recommendations and guidelines for the application of the RSA and RSI concepts within the tunnel safety operations.

  13. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  14. Safety management and risk assessment in chemical laboratories.

    PubMed

    Marendaz, Jean-Luc; Friedrich, Kirstin; Meyer, Thierry

    2011-01-01

    The present paper highlights a new safety management program, MICE (Management, Information, Control and Emergency), which has been specifically adapted for the academic environment. The process starts with an exhaustive hazard inventory supported by a platform assembling specific hazards encountered in laboratories and their subsequent classification. A proof of concept is given by a series of implementations in the domain of chemistry targeting workplace health protection. The methodology is expressed through three examples to illustrate how the MICE program can be used to address safety concerns regarding chemicals, strong magnetic fields and nanoparticles in research laboratories. A comprehensive chemical management program is also depicted.

  15. Information systems in food safety management.

    PubMed

    McMeekin, T A; Baranyi, J; Bowman, J; Dalgaard, P; Kirk, M; Ross, T; Schmid, S; Zwietering, M H

    2006-12-01

    Information systems are concerned with data capture, storage, analysis and retrieval. In the context of food safety management they are vital to assist decision making in a short time frame, potentially allowing decisions to be made and practices to be actioned in real time. Databases with information on microorganisms pertinent to the identification of foodborne pathogens, response of microbial populations to the environment and characteristics of foods and processing conditions are the cornerstone of food safety management systems. Such databases find application in: Identifying pathogens in food at the genus or species level using applied systematics in automated ways. Identifying pathogens below the species level by molecular subtyping, an approach successfully applied in epidemiological investigations of foodborne disease and the basis for national surveillance programs. Predictive modelling software, such as the Pathogen Modeling Program and Growth Predictor (that took over the main functions of Food Micromodel) the raw data of which were combined as the genesis of an international web based searchable database (ComBase). Expert systems combining databases on microbial characteristics, food composition and processing information with the resulting "pattern match" indicating problems that may arise from changes in product formulation or processing conditions. Computer software packages to aid the practical application of HACCP and risk assessment and decision trees to bring logical sequences to establishing and modifying food safety management practices. In addition there are many other uses of information systems that benefit food safety more globally, including: Rapid dissemination of information on foodborne disease outbreaks via websites or list servers carrying commentary from many sources, including the press and interest groups, on the reasons for and consequences of foodborne disease incidents. Active surveillance networks allowing rapid dissemination

  16. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines.

    PubMed

    Zhou, Lu-Jie; Cao, Qing-Gui; Yu, Kai; Wang, Lin-Lin; Wang, Hai-Bin

    2018-04-26

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines.

  17. Research on Occupational Safety, Health Management and Risk Control Technology in Coal Mines

    PubMed Central

    Zhou, Lu-jie; Cao, Qing-gui; Yu, Kai; Wang, Lin-lin; Wang, Hai-bin

    2018-01-01

    This paper studies the occupational safety and health management methods as well as risk control technology associated with the coal mining industry, including daily management of occupational safety and health, identification and assessment of risks, early warning and dynamic monitoring of risks, etc.; also, a B/S mode software (Geting Coal Mine, Jining, Shandong, China), i.e., Coal Mine Occupational Safety and Health Management and Risk Control System, is developed to attain the aforementioned objectives, namely promoting the coal mine occupational safety and health management based on early warning and dynamic monitoring of risks. Furthermore, the practical effectiveness and the associated pattern for applying this software package to coal mining is analyzed. The study indicates that the presently developed coal mine occupational safety and health management and risk control technology and the associated software can support the occupational safety and health management efforts in coal mines in a standardized and effective manner. It can also control the accident risks scientifically and effectively; its effective implementation can further improve the coal mine occupational safety and health management mechanism, and further enhance the risk management approaches. Besides, its implementation indicates that the occupational safety and health management and risk control technology has been established based on a benign cycle involving dynamic feedback and scientific development, which can provide a reliable assurance to the safe operation of coal mines. PMID:29701715

  18. A job safety program for construction workers designed to reduce the potential for occupational injury using tool box training sessions and computer-assisted biofeedback stress management techniques.

    PubMed

    Johnson, Kenneth A; Ruppe, Joan

    2002-01-01

    This project was conducted with a multicultural construction company in Hawaii, USA. The job duties performed included drywall and carpentry work. The following objectives were selected for this project: (a) fire prevention training and inspection of first aid equipment; (b) blood-borne pathogen training and risk evaluation; (c) ergonomic and risk evaluation intervention program; (d) electrical safety training and inspection program; (e) slips, trips, and falls safety training; (f) stress assessment and Personal Profile System; (g) safety and health program survey; (h) improving employee relations and morale by emphasizing spirituality; and (i) computer-assisted biofeedback stress management training. Results of the project indicated that observed safety hazards, reported injuries, and levels of perceived stress. were reduced for the majority of the population.

  19. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    NASA Technical Reports Server (NTRS)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  20. Innovative tools and techniques in identifying highway safety improvement projects : technical report.

    DOT National Transportation Integrated Search

    2017-08-01

    The Highway Safety Improvement Program (HSIP) aims to achieve a reduction in the number and severity of fatalities and serious injury crashes on all public roads by implementing highway safety improvement projects. Although the structure and main com...

  1. Application of expert systems in project management decision aiding

    NASA Technical Reports Server (NTRS)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  2. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  3. 23 CFR 973.212 - Indian lands safety management system (SMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of public information and education activities on safety needs, programs, and countermeasures... 23 Highways 1 2010-04-01 2010-04-01 false Indian lands safety management system (SMS). 973.212... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS...

  4. Major accident prevention through applying safety knowledge management approach.

    PubMed

    Kalatpour, Omid

    2016-01-01

    Many scattered resources of knowledge are available to use for chemical accident prevention purposes. The common approach to management process safety, including using databases and referring to the available knowledge has some drawbacks. The main goal of this article was to devise a new emerged knowledge base (KB) for the chemical accident prevention domain. The scattered sources of safety knowledge were identified and scanned. Then, the collected knowledge was formalized through a computerized program. The Protégé software was used to formalize and represent the stored safety knowledge. The domain knowledge retrieved as well as data and information. This optimized approach improved safety and health knowledge management (KM) process and resolved some typical problems in the KM process. Upgrading the traditional resources of safety databases into the KBs can improve the interaction between the users and knowledge repository.

  5. The Safety Attitudes of Senior Managers in the Chinese Coal Industry

    PubMed Central

    Zhang, Jiangshi; Chen, Na; Fu, Gui; Yan, Mingwei; Kim, Young-Chan

    2016-01-01

    Introduction: Senior managers’ attitudes towards safety are very important regarding the safety practices in an organization. The study is to describe the current situation of senior managers′ attitudes towards safety in the Chinese coal industry. Method: We evaluated the changing trends as well as the reasons for these changes in the Chinese coal industry in 2009 and in 2014 with 168 senior manager samples from large Chinese state-owned coal enterprises. Evaluations of 15 safety concepts were performed by means of a questionnaire. Results and Conclusions: Results indicate that, in 2014, three concepts were at a very high level (mean > 4.5), and six were at a relatively high level (4.5 > mean > 4.0). Analyses of changing trends revealed that nine concepts improved significantly, while four greatly declined in 2014 compared to those in 2009. The data reported here suggest that the reasons for the significant improvement with respect to the nine concepts include the improvement in social and legal environments, the improvement of the culture of social safety, workers′ safety demands being met, and scientific and technical advances in the coal industry. The decline of the four concepts seemed to be caused by a poor awareness of managers in the coal industry that safety creates economic benefits, insufficient information on safety, inadequate attention to the development of a safety culture and safety management methods, and safety organizations and workers′ unions not playing their role effectively. Practical Applications: We therefore recommend strengthening the evidence that safety creates economic benefits, providing incentives for employees to encourage their participation in safety management, and paying more attention to the prevention of accidents in coal mines via safety organizations and unions. These results can provide guidelines for workers, industrialists, and government regarding occupational safety in the whole coal industry. PMID:27869654

  6. National machine guarding program: Part 2. Safety management in small metal fabrication enterprises

    PubMed Central

    Yamin, Samuel C.; Brosseau, Lisa M.; Xi, Min; Gordon, Robert; Most, Ivan G.; Stanley, Rodney

    2015-01-01

    Background Small manufacturing businesses often lack important safety programs. Many reasons have been set forth on why this has remained a persistent problem. Methods The National Machine Guarding Program (NMGP) was a nationwide intervention conducted in partnership with two workers' compensation insurers. Insurance safety consultants collected baseline data in 221 business using a 33‐question safety management audit. Audits were completed during an interview with the business owner or manager. Results Most measures of safety management improved with an increasing number of employees. This trend was particularly strong for lockout/tagout. However, size was only significant for businesses without a safety committee. Establishments with a safety committee scored higher (55% vs. 36%) on the safety management audit compared with those lacking a committee (P < 0.0001). Conclusions Critical safety management programs were frequently absent. A safety committee appears to be a more important factor than business size in accounting for differences in outcome measures. Am. J. Ind. Med. 58:1184–1193, 2015. © 2015 The Authors. American Journal of Industrial Medicine Published by Wiley Periodicals, Inc. PMID:26345591

  7. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  8. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  9. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  10. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  11. Safety and Mission Assurance Knowledge Management Retention: Managing Knowledge for Successful Mission Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Teresa A.

    2006-01-01

    Knowledge Management is a proactive pursuit for the future success of any large organization faced with the imminent possibility that their senior managers/engineers with gained experiences and lessons learned plan to retire in the near term. Safety and Mission Assurance (S&MA) is proactively pursuing unique mechanism to ensure knowledge learned is retained and lessons learned captured and documented. Knowledge Capture Event/Activities/Management helps to provide a gateway between future retirees and our next generation of managers/engineers. S&MA hosted two Knowledge Capture Events during 2005 featuring three of its retiring fellows (Axel Larsen, Dave Whittle and Gary Johnson). The first Knowledge Capture Event February 24, 2005 focused on two Safety and Mission Assurance Safety Panels (Space Shuttle System Safety Review Panel (SSRP); Payload Safety Review Panel (PSRP) and the latter event December 15, 2005 featured lessons learned during Apollo, Skylab, and Space Shuttle which could be applicable in the newly created Crew Exploration Vehicle (CEV)/Constellation development program. Gemini, Apollo, Skylab and the Space Shuttle promised and delivered exciting human advances in space and benefits of space in people s everyday lives on earth. Johnson Space Center's Safety & Mission Assurance team work over the last 20 years has been mostly focused on operations we are now beginning the Exploration development program. S&MA will promote an atmosphere of knowledge sharing in its formal and informal cultures and work processes, and reward the open dissemination and sharing of information; we are asking "Why embrace relearning the "lessons learned" in the past?" On the Exploration program the focus will be on Design, Development, Test, & Evaluation (DDT&E); therefore, it is critical to understand the lessons from these past programs during the DDT&E phase.

  12. 33 CFR 96.240 - What functional requirements must a safety management system meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a safety management system meet? 96.240 Section 96.240 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.240 What functional...

  13. 77 FR 65000 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide... Use (ETASU) before CDER's Drug Safety and Risk Management Advisory Committee (DSaRM). The Agency plans...

  14. 78 FR 30929 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide... (REMS) with elements to assure safe use (ETASU) before its Drug Safety and Risk Management Advisory...

  15. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    PubMed

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  17. 76 FR 64110 - Safety and Health Management Programs for Mines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... DEPARTMENT OF LABOR Mine Safety and Health Administration RIN 1219-AB71 Safety and Health Management Programs for Mines AGENCY: Mine Safety and Health Administration, Labor. ACTION: Notice of public meetings. SUMMARY: The Mine Safety and Health Administration (MSHA) is holding a public meeting, and plans...

  18. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  19. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  20. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  1. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  2. 23 CFR 971.212 - Federal lands safety management system (SMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    .... (b) The SMS may be based on the guidance in “Safety Management Systems: Good Practices for Development and Implementation.”3 3 “Safety Management Systems: Good Practices for Development and... various levels of complexity depending on the nature of the facility and/or network involved. (e) The SMS...

  3. Safety management of a complex R and D ground operating system

    NASA Technical Reports Server (NTRS)

    Connors, J. F.; Maurer, R. A.

    1975-01-01

    A perspective on safety program management was developed for a complex R&D operating system, such as the NASA-Lewis Research Center. Using a systems approach, hazardous operations are subjected to third-party reviews by designated-area safety committees and are maintained under safety permit controls. To insure personnel alertness, emergency containment forces and employees are trained in dry-run emergency simulation exercises. The keys to real safety effectiveness are top management support and visibility of residual risks.

  4. 77 FR 75176 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-19

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug... being rescheduled due to the postponement of the October 29-30, 2012, Drug Safety and Risk Management... Committee: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide...

  5. 75 FR 59078 - Safety Zone; Ledge Removal Project, Bass Harbor, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2010-0806] RIN 1625-AA00 Safety Zone; Ledge Removal Project, Bass Harbor, ME AGENCY: Coast Guard, DHS. ACTION: Temporary... District USACE Web site: http://www.nae.usace.army.mil/projects/me/bassharbor/bassharbor.htm . No...

  6. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  7. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  8. The SISIFO project: Seismic Safety at High Schools

    NASA Astrophysics Data System (ADS)

    Peruzza, Laura; Barnaba, Carla; Bragato, Pier Luigi; Dusi, Alberto; Grimaz, Stefano; Malisan, Petra; Saraò, Angela; Mucciarelli, Marco

    2014-05-01

    For many years, the Italian scientific community has faced the problem of the reduction of earthquake risk using innovative educational techniques. Recent earthquakes in Italy and around the world have clearly demonstrated that seismic codes alone are not able to guarantee an effective mitigation of risk. After the tragic events of San Giuliano di Puglia (2002), where an earthquake killed 26 school children, special attention was paid in Italy to the seismic safety of schools, but mainly with respect to structural aspects. Little attention has been devoted to the possible and even significant damage to non-structural elements (collapse of ceilings, tipping of cabinets and shelving, obstruction of escape routes, etc..). Students and teachers trained on these aspects may lead to a very effective preventive vigilance. Since 2002, the project EDURISK (www.edurisk.it) proposed educational tools and training programs for schools, at primary and middle levels. More recently, a nationwide campaign aimed to adults (www.iononrischio.it) was launched with the extensive support of civil protection volounteers. There was a gap for high schools, and Project SISIFO was designed to fill this void and in particular for those schools with technical/scientific curricula. SISIFO (https://sites.google.com/site/ogssisifo/) is a multidisciplinary initiative, aimed at the diffusion of scientific culture for achieving seismic safety in schools, replicable and can be structured in training the next several years. The students, helped by their teachers and by experts from scientific institutions, followed a course on specialized training on earthquake safety. The trial began in North-East Italy, with a combination of hands-on activities for the measurement of earthquakes with low-cost instruments and lectures with experts in various disciplines, accompanied by specifically designed teaching materials, both on paper and digital format. We intend to raise teachers and students knowledge of the

  9. 76 FR 12300 - Safety Management System for Certificated Airports; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    ...-0997; Notice No. 10-14] RIN 2120-AJ38 Safety Management System for Certificated Airports; Extension of...: Background On October 7, 2010, the FAA published Notice No. 10-14, entitled ``Safety Management System for... conclusions from the safety management systems proof of concept. The FAA anticipates making this report...

  10. Cultural differences in Research project management

    NASA Astrophysics Data System (ADS)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  11. Patterns of patient safety culture: a complexity and arts-informed project of knowledge translation.

    PubMed

    Mitchell, Gail J; Tregunno, Deborah; Gray, Julia; Ginsberg, Liane

    2011-01-01

    The purpose of this paper is to describe patterns of patient safety culture that emerged from an innovative collaboration among health services researchers and fine arts colleagues. The group engaged in an arts-informed knowledge translation project to produce a dramatic expression of patient safety culture research for inclusion in a symposium. Scholars have called for a deeper understanding of the complex interrelationships among structure, process and outcomes relating to patient safety. Four patterns of patient safety culture--blinding familiarity, unyielding determination, illusion of control and dismissive urgency--are described with respect to how they informed creation of an arts-informed project for knowledge translation.

  12. Working together to ensure safety at hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartel, J.W.

    Providing for public safety around a hydroelectric facility can be critically important to the welfare of a hydro-power producer. With this in mind, Wisconsin Electric Power Company and Wisconsin Public Service Corporation have worked together to develop consistent safety signage and several for their hydro projects. Although the two utilities sometimes compete for electric customers, they cooperate to ensure the safety to those customers. Both WE and WPS took steps in 1986 to make their operations safer through involvement in the Wisconsin/Michigan Hydro User Group. The organization has 25 members-primarily of electric utilities and paper companies-who operate hydro facilities inmore » the two states. The two areas that the HUG studied in public safety were signs and warning systems. HUG established a sign committee to study how to increase safety of people around hydro plants through signs, explained Ted Handrick, hydro plant superintendent at WPS. The committee's recommendations led to development of a statewide uniform sign system adopted by all HUG members. The committee used Wisconsin Department of Natural Resources' guidelines for warning signs and portages in developing the signage standards. HUG members are converting to these new sign standards as they replace old signs and/or install new signs. Notices describing the new signage system have been placed near each hydro plant, at boat landings, and in campgrounds. The signs are mounted well above ground level so they can be seen and easily read by recreationalists. Warning systems, in accordance with HUG warning standards, were installed at WE and WPS hydro facilities. These systems alert nearby recreational users of rapid increases in water flow when generating units are turned on or when spillway gates are opened. Soon after the authors installed equipment to remotely operate its hydro facilities, the utility experienced a dramatic increase increase in intrusion on dams and other structures at the

  13. Compendium of Traffic Safety Research Projects: 1985-1995 and Beyond

    DOT National Transportation Integrated Search

    1996-03-01

    The National Highway Traffic Safety Administration's Office of Program : Development and Evaluation (OPDE) conducts research and evaluation projects : dealing with human attitudes, behaviors and failures (motor vehicle crashes). : OPDE's focus is on ...

  14. Identifying behaviour patterns of construction safety using system archetypes.

    PubMed

    Guo, Brian H W; Yiu, Tak Wing; González, Vicente A

    2015-07-01

    Construction safety management involves complex issues (e.g., different trades, multi-organizational project structure, constantly changing work environment, and transient workforce). Systems thinking is widely considered as an effective approach to understanding and managing the complexity. This paper aims to better understand dynamic complexity of construction safety management by exploring archetypes of construction safety. To achieve this, this paper adopted the ground theory method (GTM) and 22 interviews were conducted with participants in various positions (government safety inspector, client, health and safety manager, safety consultant, safety auditor, and safety researcher). Eight archetypes were emerged from the collected data: (1) safety regulations, (2) incentive programs, (3) procurement and safety, (4) safety management in small businesses (5) production and safety, (6) workers' conflicting goals, (7) blame on workers, and (8) reactive and proactive learning. These archetypes capture the interactions between a wide range of factors within various hierarchical levels and subsystems. As a free-standing tool, they advance the understanding of dynamic complexity of construction safety management and provide systemic insights into dealing with the complexity. They also can facilitate system dynamics modelling of construction safety process. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. Management capacity to promote nurse workplace health and safety.

    PubMed

    Fang, Yaxuan; McDonald, Tracey

    2018-04-01

    To investigate regarding workplace health and safety factors, and to identify strategies to preserve and promote a healthy nursing workplace. Data collected using the Delphi technique with input from 41 key informants across four participant categories drawn from a Chinese university and four hospitals were thematically analysed. Most respondents agreed on the importance of nurses' health and safety, and that nurse managers should act to protect nurses, but not enough on workplace safety. Hospital policies, staff disempowerment, workload and workplace conflicts are major obstacles. The reality of Chinese nurses' workplaces is that health and safety risks abound and relate to socio-cultural expectations of women. Self-management of risks is neccessary, gaps exist in understanding of workplace risks among different nursing groups and their perceptions of the professional status, and the value of nurses' contribution to ongoing risks in the hospital workplace. The Chinese hospital system must make these changes to produce a safer working environment for nurses. This research, based in China, presents an instructive tale for all countries that need support on the types and amounts of management for nurses working at the clinical interface, and on the consequences of management neglect of relevant policies and procedures. © 2017 John Wiley & Sons Ltd.

  16. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  17. Patient safety--worker safety: building a culture of safety to improve healthcare worker and patient well-being.

    PubMed

    Yassi, Annalee; Hancock, Tina

    2005-01-01

    Patient safety within the Canadian healthcare system is currently a high national priority, which merits a comprehensive understanding of the underlying causes of adverse events. Not least among these is worker health and safety, which is linked to patient outcomes. Healthcare workers have a high risk of workplace injuries and more mental health problems than most other occupational groups. Many healthcare professionals feel fatigued, stressed, in pain, or at risk of illness or injury-factors they feel impede their ability to provide consistent quality care. With this background, the Occupational Health and Safety Agency for Healthcare (OHSAH) in British Columbia, jointly governed by healthcare unions and healthcare employers, launched several major initiatives to improve the healthcare workplace. These included the promotion of safe patient handling, adaptive clothing, scheduled toileting, stroke management training, measures to improve management of aggressive behaviour and, of course, infection control-all intended to improve the safety of workers, but also to improve patient safety and quality of care. Other projects also explicitly promoting physical and mental health at work, as well as patient safety are also underway. Results of the projects are at various stages of completion, but ample evidence has already been obtained to indicate that looking after the well-being of healthcare workers results in safer and better quality patient care. While more research is needed, our work to date suggests that a comprehensive systems approach to promoting a climate of safety, which includes taking into account workplace organizational factors and physical and psychological hazards for workers, is the best way to improve the healthcare workplace and thereby patient safety.

  18. PACS project management utilizing web-based tools

    NASA Astrophysics Data System (ADS)

    Patel, Sunil; Levin, Brad; Gac, Robert J., Jr.; Harding, Douglas, Jr.; Chacko, Anna K.; Radvany, Martin; Romlein, John R.

    2000-05-01

    As Picture Archiving and Communications Systems (PACS) implementations become more widespread, the management of deploying large, multi-facility PACS will become a more frequent occurrence. The tools and usability of the World Wide Web to disseminate project management information obviates time, distance, participant availability, and data format constraints, allowing for the effective collection and dissemination of PACS planning, implementation information, for a potentially limitless number of concurrent PACS sites. This paper will speak to tools, such as (1) a topic specific discussion board, (2) a 'restricted' Intranet, within a 'project' Intranet. We will also discuss project specific methods currently in use in a leading edge, regional PACS implementation concerning the sharing of project schedules, physical drawings, images of implementations, site-specific data, point of contacts lists, project milestones, and a general project overview. The individual benefits realized for the end user from each tool will also be covered. These details will be presented, balanced with a spotlight on communication as a critical component of any project management undertaking. Using today's technology, the web arguably provides the most cost and resource effective vehicle to facilitate the broad based, interactive sharing of project information.

  19. CloudSat Safety Operations at Vandenberg AFB

    NASA Technical Reports Server (NTRS)

    Greenberg, Steve

    2006-01-01

    CloudSat safety operations at Vendenberg AFB is given. The topics include: 1) CloudSat Project Overview; 2) Vandenberg Ground Operations; 3) Delta II Launch Vehicle; 4) The A-Train; 5) System Safety Management; 6) CALIPSO Hazards Assessment; 7) CALIPSO Supplemental Safeguards; 8) Joint System Safety Operations; 9) Extended Stand-down; 10) Launch Delay Safety Concerns; and 11) Lessons Learned.

  20. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  1. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  2. Management commitment to safety as organizational support: relationships with non-safety outcomes in wood manufacturing employees

    Treesearch

    Judd H. Michael; Demetrice D. Evans; Karen J. Jansen; Joel M. Haight

    2005-01-01

    Employee perceptions of management commitment to safety are known to influence important safety-related outcomes. However, little work has been conducted to explore nonsafety-related outcomes resulting from a commitment to safety. Method: Employee-level outcomes critical to the effective functioning of an organization, including attitudes such as job...

  3. Framework for selection and evaluation of bicycle and pedestrian safety projects in Virginia.

    DOT National Transportation Integrated Search

    2008-01-01

    The Virginia Department of Transportation's (VDOT) Bicycle and Pedestrian Safety (BPS) Program provides funds for implementing short-term, low-cost bicycle and pedestrian safety projects in Virginia. This initiative is administered by evaluating each...

  4. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.

  5. EU Funded Research Activities on NPPS Operational Safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manolatos, P.; Van Goethem, G.

    2002-07-01

    The 5. framework programme (FP-5), the pluri-annual research programme of the European Union (EU), covers the period 1998-2002. Research on nuclear energy, fusion and fission, is covered by the EURATOM part of the FP-5. An overview of the Euratom's research on Nuclear Reactor Safety, managed by the DG-RTD of the European Commission (EC), is presented. This concerns 70 multi-partner projects of approximately euro 82.5 million total contract value that have been selected and co-financed during the period 1999-2001. They form the three clusters of projects dealing with the 'Operational Safety of Existing Installations'. 'Plant Life Extension and Management' (PLEM), 'Severemore » Accident Management' (SAM) and 'Evolutionary concepts' (EVOL). Emphasis is given here to the projects of the PLEM cluster. (authors)« less

  6. Managing Small Spacecraft Projects: Less is Not Easier

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  7. Quality management and perceptions of teamwork and safety climate in European hospitals.

    PubMed

    Kristensen, Solvejg; Hammer, Antje; Bartels, Paul; Suñol, Rosa; Groene, Oliver; Thompson, Caroline A; Arah, Onyebuchi A; Kutaj-Wasikowska, Halina; Michel, Philippe; Wagner, Cordula

    2015-12-01

    This study aimed to investigate the associations of quality management systems with teamwork and safety climate, and to describe and compare differences in perceptions of teamwork climate and safety climate among clinical leaders and frontline clinicians. We used a multi-method, cross-sectional approach to collect survey data of quality management systems and perceived teamwork and safety climate. Our data analyses included descriptive and multilevel regression methods. Data on implementation of quality management system from seven European countries were evaluated including patient safety culture surveys from 3622 clinical leaders and 4903 frontline clinicians. Perceived teamwork and safety climate. Teamwork climate was reported as positive by 67% of clinical leaders and 43% of frontline clinicians. Safety climate was perceived as positive by 54% of clinical leaders and 32% of frontline clinicians. We found positive associations between implementation of quality management systems and teamwork and safety climate. Our findings, which should be placed in a broader clinical quality improvement context, point to the importance of quality management systems as a supportive structural feature for promoting teamwork and safety climate. To gain a deeper understanding of this association, further qualitative and quantitative studies using longitudinally collected data are recommended. The study also confirms that more clinical leaders than frontline clinicians have a positive perception of teamwork and safety climate. Such differences should be accounted for in daily clinical practice and when tailoring initiatives to improve teamwork and safety climate. © The Author 2015. Published by Oxford University Press in association with the International Society for Quality in Health Care; all rights reserved.

  8. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    PubMed

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  9. An analysis of problem drinker diagnosis and referral within the Fairfax Alcohol Safety Action Project, 1972.

    DOT National Transportation Integrated Search

    1974-01-01

    This report is one of a series developed in conformance with annual reporting requirements contained within Alcohol Safety Action Projects: Evaluation. In February 1972, operations of the Fairfax Alcohol Safety Action Project began and these federall...

  10. Influence of the economy crisis on project cost management

    NASA Astrophysics Data System (ADS)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  11. A Framework for Assessment of Aviation Safety Technology Portfolios

    NASA Technical Reports Server (NTRS)

    Jones, Sharon M.; Reveley, Mary S.

    2014-01-01

    The programs within NASA's Aeronautics Research Mission Directorate (ARMD) conduct research and development to improve the national air transportation system so that Americans can travel as safely as possible. NASA aviation safety systems analysis personnel support various levels of ARMD management in their fulfillment of system analysis and technology prioritization as defined in the agency's program and project requirements. This paper provides a framework for the assessment of aviation safety research and technology portfolios that includes metrics such as projected impact on current and future safety, technical development risk and implementation risk. The paper also contains methods for presenting portfolio analysis and aviation safety Bayesian Belief Network (BBN) output results to management using bubble charts and quantitative decision analysis techniques.

  12. Food safety management and risk assessment in the fresh produce supply chain

    NASA Astrophysics Data System (ADS)

    Jacxsens, L.; Uyttendaele, M.; Luning, P.; Allende, A.

    2017-04-01

    This paper is the output of several years of scientific research coordinated by Laboratory of Food Preservation and Food Microbiology at UGent, within the EU FP7 Research project Veg-i-trade (www.vegitrade.org), in collaboration with among other partners, Wageningen University and Cebas-CSIC. Fresh produce and derived products are globally traded and subjected to an inherent sensitive towards enteric pathogens as Salmonella and pathogenic E. coli due to their cultivation practices. As fruits and vegetables are increasingly being consumed raw, a potential health risk towards consumers is present. In the Veg-i-Trade project the extend of presence of pathogens in leafy greens and strawberry fruit and their cultivation environment (as water, soil, manured soil, etc.) was analysed. Insight in the food safety management system enlighted the need for further fostering and guidance towards farmers in good practices in order to reduce the potential pressure of the presence of the pathogens both in EU and non EU countries. Exposure assessment calculations demonstrated the usefulness of mathematic modelling to gain more insight in fragmented microbiological analysis and information of cultivation practices, as such the impact of contamination of irrigation water and the impact of a flooding event. Veg-i-Trade was a challenging project both in scientific and management perspective as 23 partners collaborated.

  13. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  14. Safety in construction--a comprehensive description of the characteristics of high safety standards in construction work, from the combined perspective of supervisors and experienced workers.

    PubMed

    Törner, Marianne; Pousette, Anders

    2009-01-01

    The often applied engineering approach to safety management in the construction industry needs to be supplemented by organizational measures and measures based on how people conceive and react to their social environment. This requires in-depth knowledge of the broad preconditions for high safety standards in construction. The aim of the study was to comprehensively describe the preconditions and components of high safety standards in the construction industry from the perspective of both experienced construction workers and first-line managers. Five worker safety representatives and 19 first-line managers were interviewed, all strategically selected from within a large Swedish construction project. Phenomenographic methodology was used for data acquisition and analysis and to categorize the information. Nine informants verified the results. The study identified four main categories of work safety preconditions and components: (1) Project characteristics and nature of the work, which set the limits of safety management; (2) Organization and structures, with the subcategories planning, work roles, procedures, and resources; (3) Collective values, norms, and behaviors, with the subcategories climate and culture, and interaction and cooperation; and (4) Individual competence and attitudes, with the subcategories knowledge, ability and experience, and individual attitudes. The results comprehensively describe high safety standards in construction, incorporating organizational, group, individual, and technical aspects. High-quality interaction between different organizational functions and hierarchical levels stood out as important aspects of safety. The results are discussed in relation to previous research into safety and into the social-psychological preconditions for other desired outcomes in occupational settings. The results can guide construction companies in planning and executing construction projects to a high safety standard.

  15. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  16. Safety-Net Institutions Buffer the Impact of Medicaid Managed Care: A Multi-Method Assessment in a Rural State

    PubMed Central

    Waitzkin, Howard; Williams, Robert L.; Bock, John A.; McCloskey, Joanne; Willging, Cathleen; Wagner, William

    2002-01-01

    Objectives. This project used a long-term, multi-method approach to study the impact of Medicaid managed care. Methods. Survey techniques measured impacts on individuals, and ethnographic methods assessed effects on safety-net providers in New Mexico. Results. After the first year of Medicaid managed care, uninsured adults reported less access and use (odds ratio [OR] = 0.46; 95% confidence interval [CI] = 0.34, 0.64) and worse barriers to care (OR = 6.60; 95% CI = 3.95, 11.54) than adults in other insurance categories. Medicaid children experienced greater access and use (OR = 2.11; 95% CI = 1.21, 3.72) and greater communication and satisfaction (OR = 3.64; 95% CI = 1.13, 12.54) than children in other insurance categories; uninsured children encountered greater barriers to care (OR = 6.29; 95% CI = 1.58, 42.21). There were no consistent changes in the major outcome variables over the period of transition to Medicaid managed care. Safety-net institutions experienced marked increases in workload and financial stress, especially in rural areas. Availability of mental health services declined sharply. Providers worked to buffer the impact of Medicaid managed care for patients. Conclusions. In its first year, Medicaid managed care exerted major effects on safety-net providers but relatively few measurable effects on individuals. This reform did not address the problems of the uninsured. PMID:11919059

  17. System Safety in Early Manned Space Program: A Case Study of NASA and Project Mercury

    NASA Technical Reports Server (NTRS)

    Hansen, Frederick D.; Pitts, Donald

    2005-01-01

    This case study provides a review of National Aeronautics and Space Administration s (NASA's) involvement in system safety during research and evolution from air breathing to exo-atmospheric capable flight systems culminating in the successful Project Mercury. Although NASA has been philosophically committed to the principals of system safety, this case study points out that budget and manpower constraints-as well as a variety of internal and external pressures can jeopardize even a well-designed system safety program. This study begins with a review of the evolution and early years of NASA's rise as a project lead agency and ends with the lessons learned from Project Mercury.

  18. 77 FR 50916 - Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0767] RIN 1625-AA00 Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA AGENCY: Coast.... 165.T01-0767 Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA. (a...

  19. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  20. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  1. Projecting effects of improvements in passive safety of the New Zealand light vehicle fleet.

    PubMed

    Keall, Michael; Newstead, Stuart; Jones, Wayne

    2007-09-01

    In the year 2000, as part of the process for setting New Zealand road safety targets, a projection was made for a reduction in social cost of 15.5 percent associated with improvements in crashworthiness, which is a measure of the occupant protection of the light passenger vehicle fleet. Since that document was produced, new estimates of crashworthiness have become available, allowing for a more accurate projection. The objective of this paper is to describe a methodology for projecting changes in casualty rates associated with passive safety features and to apply this methodology to produce a new prediction. The shape of the age distribution of the New Zealand light passenger vehicle fleet was projected to 2010. Projected improvements in crashworthiness and associated reductions in social cost were also modeled based on historical trends. These projections of changes in the vehicle fleet age distribution and of improvements in crashworthiness together provided a basis for estimating the future performance of the fleet in terms of secondary safety. A large social cost reduction of about 22 percent for 2010 compared to the year 2000 was predicted due to the expected huge impact of improvements in passive vehicle features on road trauma in New Zealand. Countries experiencing improvements in their vehicle fleets can also expect significant reductions in road injury compared to a less crashworthy passenger fleet. Such road safety gains can be analyzed using some of the methodology described here.

  2. Safety Management for Water Play Facilities.

    ERIC Educational Resources Information Center

    Thompson, Claude

    1986-01-01

    Modern aquatic facilities, which include wave pools, water slides, and shallow water activity play pools, have a greater potential for injuries and lawsuits than conventional swimming pools. This article outlines comprehensive safety management for such facilities, including potential accident identification and injury control planning. (MT)

  3. [Post-marketing drug safety-risk management plan(RMP)].

    PubMed

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  4. Design and Testing of the Safety Agenda Mobile App for Managing Health Care Managers’ Patient Safety Responsibilities

    PubMed Central

    Carrillo, Irene; Fernandez, Cesar; Vicente, Maria Asuncion; Guilabert, Mercedes

    2016-01-01

    Background Adverse events are a reality in clinical practice. Reducing the prevalence of preventable adverse events by stemming their causes requires health managers’ engagement. Objective The objective of our study was to develop an app for mobile phones and tablets that would provide managers with an overview of their responsibilities in matters of patient safety and would help them manage interventions that are expected to be carried out throughout the year. Methods The Safety Agenda Mobile App (SAMA) was designed based on standardized regulations and reviews of studies about health managers’ roles in patient safety. A total of 7 managers used a beta version of SAMA for 2 months and then they assessed and proposed improvements in its design. Their experience permitted redesigning SAMA, improving functions and navigation. A total of 74 Spanish health managers tried out the revised version of SAMA. After 4 months, their assessment was requested in a voluntary and anonymous manner. Results SAMA is an iOS app that includes 37 predefined tasks that are the responsibility of health managers. Health managers can adapt these tasks to their schedule, add new ones, and share them with their team. SAMA menus are structured in 4 main areas: information, registry, task list, and settings. Of the 74 users who tested SAMA, 64 (86%) users provided a positive assessment of SAMA characteristics and utility. Over an 11-month period, 238 users downloaded SAMA. This mobile app has obtained the AppSaludable (HealthyApp) Quality Seal. Conclusions SAMA includes a set of activities that are expected to be carried out by health managers in matters of patient safety and contributes toward improving the awareness of their responsibilities in matters of safety. PMID:27932315

  5. A Symbiosis between Instructional Systems Design and Project Management

    ERIC Educational Resources Information Center

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  6. [Healthcare manager and project management of quality improvement : analysis of managerial action using a professional hands-on training in project management].

    PubMed

    Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice

    2016-06-01

    Introduction : project management is on the expected proficiencies for head nurses. Context : The work on the organizations’ improvement carried out by head nurses, is rarely covered in the literature. Objectives : to follow the implementation of actions from projects led by head nurses and to analyze the parameters of success. Method : for a year, an intervention study has followed 17 projects initiating improvement measures. Semistructured interviews were conducted with health-care teams and managers. All of them reported the results of the implementation of each measure as an operational improvement. A mixed analysis containing a logistic regression investigated associations between the result of the action and the various contextual characteristics. Results : this study involved 111 actions. 71 % of them concluded an operational improvement. The organizational and supporting actions had a high success rate, which decreased when hazards were not managed by healthcare managers. Discussion : this study highlights the place of strategies through the implementing methods and the chosen actions. Recommendations are made in order to promote a collective assessment. Conclusion : scientific approaches are proposed to discuss the organizational work.

  7. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    ERIC Educational Resources Information Center

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  8. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    NASA Astrophysics Data System (ADS)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  9. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  10. 75 FR 62008 - Safety Management System for Certificated Airports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-07

    .... The majority of pilot study airports indicated an existing organizational structure to manage safety... organizational structure; Identifies the lines of safety responsibility and accountability; Establishes and... understands that airport operations and organizational structures vary widely. Accordingly, the FAA would not...

  11. Project management in the development of scientific software

    NASA Astrophysics Data System (ADS)

    Platz, Jochen

    1986-08-01

    This contribution is a rough outline of a comprehensive project management model for the development of software for scientific applications. The model was tested in the unique environment of the Siemens AG Corporate Research and Technology Division. Its focal points are the structuring of project content - the so-called phase organization, the project organization and the planning model used, and its particular applicability to innovative projects. The outline focuses largely on actual project management aspects rather than associated software engineering measures.

  12. 49 CFR 385.321 - What failures of safety management practices disclosed by the safety audit will result in a...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... disclosed by the safety audit will result in a notice to a new entrant that its USDOT new entrant... MOTOR CARRIER SAFETY REGULATIONS SAFETY FITNESS PROCEDURES New Entrant Safety Assurance Program § 385.321 What failures of safety management practices disclosed by the safety audit will result in a notice...

  13. The PI-Mode of Project Management

    NASA Technical Reports Server (NTRS)

    Isaac, Dan

    1997-01-01

    The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.

  14. Slovenian Experience with the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stritar, A.

    Slovenia is a relatively small European country with only one operating nuclear power plant, one operating research reactor and one Central Interim Storage for Radioactive Waste from small producers. There are also a uranium mine and mill at Zirovski vrh, both in the decommissioning stage. The Slovenian Government, its public and neighboring countries are most interested in the managing of radioactive waste in the safest possible way by carefully utilizing best practices and existing human and financial resources. In order to achieve this goal the tight connection with the international community in the area of radioactive waste management is essential.more » Slovenia was among those countries involved in the process of preparation of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (Joint Convention) from the very beginning and was also among first ratifiers. Slovenia had prepared the first report under the Convention and took part in the first Review Meeting in November 2003. The preparation of this report was not regarded only as a fulfillment of obligation toward Joint Convention, but was considered primarily as a kind of self appraisal of the national radioactive management program. Therefore the preparation of the report primarily contributed to the improvements in the field of radioactive waste management and consequently enhanced the safety of our public. For the preparation of the second report for the review meeting in 2006 it was decided to follow the structure of the first report. Only updates were introduced and eventual changes in the area of radioactive waste management were reflected. (authors)« less

  15. Expanding the scope of practice for radiology managers: radiation safety duties.

    PubMed

    Orders, Amy B; Wright, Donna

    2003-01-01

    In addition to financial responsibilities and patient care duties, many medical facilities also expect radiology department managers to wear "safety" hats and complete fundamental quality control/quality assurance, conduct routine safety surveillance in the department, and to meet regulatory demands in the workplace. All managers influence continuous quality improvement initiatives, from effective utilization of resource and staffing allocations, to efficacy of patient scheduling tactics. It is critically important to understand continuous quality improvement (CQI) and its relationship with the radiology manager, specifically quality assurance/quality control in routine work, as these are the fundamentals of institutional safety, including radiation safety. When an institution applies for a registration for radiation-producing devices or a license for the use of radioactive materials, the permit granting body has specific requirements, policies and procedures that must be satisfied in order to be granted a permit and to maintain it continuously. In the 32 U.S. Agreement states, which are states that have radiation safety programs equivalent to the Nuclear Regulatory Commission programs, individual facilities apply for permits through the local governing body of radiation protection. Other states are directly licensed by the Nuclear Regulatory Commission and associated regulatory entities. These regulatory agencies grant permits, set conditions for use in accordance with state and federal laws, monitor and enforce radiation safety activities, and audit facilities for compliance with their regulations. Every radiology department and associated areas of radiation use are subject to inspection and enforcement policies in order to ensure safety of equipment and personnel. In today's business practice, department managers or chief technologists may actively participate in the duties associated with institutional radiation safety, especially in smaller institutions, while

  16. NACA Wartime Safety Poster

    NASA Image and Video Library

    1945-04-21

    One of many safety posters produced by NACA artists during World War II. The Aircraft Engine Research Laboratory established a Safety Office in 1942 to coordinate and oversee safety-related activities. The lab struggled to maintain a full staff during the war when military research projects were at a peak. NACA management mandated six-day work weeks without overtime and the elimination of holidays. As such, workplace injuries were a serious threat to maintaining productivity needed to sustain the military’s aeronautics efforts.

  17. 33 CFR 96.250 - What documents and reports must a safety management system have?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Safety management system document and data maintenance (1) Procedures which establish and maintain control of all documents and data relevant to the safety management system. (2) Documents are available at... safety management system have? 96.250 Section 96.250 Navigation and Navigable Waters COAST GUARD...

  18. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  19. Management of radioactive material safety programs at medical facilities. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, L.W.; Schlueter, J.; Woods, S.

    A Task Force, comprising eight US Nuclear Regulatory Commission and two Agreement State program staff members, developed the guidance contained in this report. This report describes a systematic approach for effectively managing radiation safety programs at medical facilities. This is accomplished by defining and emphasizing the roles of an institution`s executive management, radiation safety committee, and radiation safety officer. Various aspects of program management are discussed and guidance is offered on selecting the radiation safety officer, determining adequate resources for the program, using such contractual services as consultants and service companies, conducting audits, and establishing the roles of authorized usersmore » and supervised individuals; NRC`s reporting and notification requirements are discussed, and a general description is given of how NRC`s licensing, inspection and enforcement programs work.« less

  20. 23 CFR 630.1106 - Policy and procedures for work zone safety management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Policy and procedures for work zone safety management... Policy and procedures for work zone safety management. (a) Each agency's policy and processes, procedures... established in accordance with 23 CFR 630.1006, shall include the consideration and management of road user...

  1. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  2. Spent Nuclear Fuel Project Configuration Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reilly, M.A.

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  3. Construction project management handbook : September 2009.

    DOT National Transportation Integrated Search

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  4. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...

  5. 77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...

  6. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  7. Integrating a Project Management Approach to E-Business Application Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2008-01-01

    Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…

  8. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  9. Safety management of Ethernet broadband access based on VLAN aggregation

    NASA Astrophysics Data System (ADS)

    Wang, Li

    2004-04-01

    With broadband access network development, the Ethernet technology is more and more applied access network now. It is different from the private network -LAN. The differences lie in four points: customer management, safety management, service management and count-fee management. This paper mainly discusses the safety management related questions. Safety management means that the access network must secure the customer data safety, isolate the broad message which brings the customer private information, such as ARP, DHCP, and protect key equipment from attack. Virtue LAN (VLAN) technology can restrict network broadcast flow. We can config each customer port with a VLAN, so each customer is isolated with others. The IP address bound with VLAN ID can be routed rightly. But this technology brings another question: IP address shortage. VLAN aggregation technology can solve this problem well. Such a mechanism provides several advantages over traditional IPv4 addressing architectures employed in large switched LANs today. With VLAN aggregation technology, we introduce the notion of sub-VLANs and super-VLANs, a much more optimal approach to IP addressing can be realized. This paper will expatiate the VLAN aggregation model and its implementation in Ethernet access network. It is obvious that the customers in different sub-VLANs can not communication to each other because the ARP packet is isolated. Proxy ARP can enable the communication among them. This paper will also expatiate the proxy ARP model and its implementation in Ethernet access network.

  10. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  11. Watershed safety and quality control by safety threshold method

    NASA Astrophysics Data System (ADS)

    Da-Wei Tsai, David; Mengjung Chou, Caroline; Ramaraj, Rameshprabu; Liu, Wen-Cheng; Honglay Chen, Paris

    2014-05-01

    Taiwan was warned as one of the most dangerous countries by IPCC and the World Bank. In such an exceptional and perilous island, we would like to launch the strategic research of land-use management on the catastrophe prevention and environmental protection. This study used the watershed management by "Safety Threshold Method" to restore and to prevent the disasters and pollution on island. For the deluge prevention, this study applied the restoration strategy to reduce total runoff which was equilibrium to 59.4% of the infiltration each year. For the sediment management, safety threshold management could reduce the sediment below the equilibrium of the natural sediment cycle. In the water quality issues, the best strategies exhibited the significant total load reductions of 10% in carbon (BOD5), 15% in nitrogen (nitrate) and 9% in phosphorus (TP). We found out the water quality could meet the BOD target by the 50% peak reduction with management. All the simulations demonstrated the safety threshold method was helpful to control the loadings within the safe range of disasters and environmental quality. Moreover, from the historical data of whole island, the past deforestation policy and the mistake economic projects were the prime culprits. Consequently, this study showed a practical method to manage both the disasters and pollution in a watershed scale by the land-use management.

  12. Safety management of an underground-based gravitational wave telescope: KAGRA

    NASA Astrophysics Data System (ADS)

    Ohishi, Naoko; Miyoki, Shinji; Uchiyama, Takashi; Miyakawa, Osamu; Ohashi, Masatake

    2014-08-01

    KAGRA is a unique gravitational wave telescope with its location underground and use of cryogenic mirrors. Safety management plays an important role for secure development and operation of such a unique and large facility. Based on relevant law in Japan, Labor Standard Act and Industrial Safety and Health Law, various countermeasures are mandated to avoid foreseeable accidents and diseases. In addition to the usual safety management of hazardous materials, such as cranes, organic solvents, lasers, there are specific safety issues in the tunnel. Prevention of collapse, flood, and fire accidents are the most critical issues for the underground facility. Ventilation is also important for prevention of air pollution by carbon monoxide, carbon dioxide, organic solvents and radon. Oxygen deficiency should also be prevented.

  13. 30 CFR 585.811 - When must I follow my Safety Management System?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., COPs and GAPs Safety Management Systems § 585.811 When must I follow my Safety Management System? Your... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...

  14. 30 CFR 585.811 - When must I follow my Safety Management System?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., COPs and GAPs Safety Management Systems § 585.811 When must I follow my Safety Management System? Your... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...

  15. 30 CFR 585.811 - When must I follow my Safety Management System?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., COPs and GAPs Safety Management Systems § 585.811 When must I follow my Safety Management System? Your... COP, SAP, or GAP. You must conduct all activities described in your approved COP, SAP, or GAP in...

  16. Mental models of safety: do managers and employees see eye to eye?

    PubMed

    Prussia, Gregory E; Brown, Karen A; Willis, P Geoff

    2003-01-01

    Disagreements between managers and employees about the causes of accidents and unsafe work behaviors can lead to serious workplace conflicts and distract organizations from the important work of establishing positive safety climate and reducing the incidence of accidents. In this study, the authors examine a model for predicting safe work behaviors and establish the model's consistency across managers and employees in a steel plant setting. Using the model previously described by Brown, Willis, and Prussia (2000), the authors found that when variables influencing safety are considered within a framework of safe work behaviors, managers and employees share a similar mental model. The study then contrasts employees' and managers' specific attributional perceptions. Findings from these more fine-grained analyses suggest the two groups differ in several respects about individual constructs. Most notable were contrasts in attributions based on their perceptions of safety climate. When perceived climate is poor, managers believe employees are responsible and employees believe managers are responsible for workplace safety. However, as perceived safety climate improves, managers and employees converge in their perceptions of who is responsible for safety. It can be concluded from this study that in a highly interdependent work environment, such as a steel mill, where high system reliability is essential and members possess substantial experience working together, managers and employees will share general mental models about the factors that contribute to unsafe behaviors, and, ultimately, to workplace accidents. It is possible that organizations not as tightly coupled as steel mills can use such organizations as benchmarks, seeking ways to create a shared understanding of factors that contribute to a safe work environment. Part of this improvement effort should focus on advancing organizational safety climate. As climate improves, managers and employees are likely to agree

  17. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  18. Project Management in NASA: The system and the men

    NASA Technical Reports Server (NTRS)

    Pontious, R. H.; Barnes, L. B.

    1973-01-01

    An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

  19. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  20. A study of leading indicators for occupational health and safety management systems in healthcare.

    PubMed

    Almost, Joan M; VanDenKerkhof, Elizabeth G; Strahlendorf, Peter; Caicco Tett, Louise; Noonan, Joanna; Hayes, Thomas; Van Hulle, Henrietta; Adam, Ryan; Holden, Jeremy; Kent-Hillis, Tracy; McDonald, Mike; Paré, Geneviève C; Lachhar, Karanjit; Silva E Silva, Vanessa

    2018-04-23

    In Ontario, Canada, approximately $2.5 billion is spent yearly on occupational injuries in the healthcare sector. The healthcare sector has been ranked second highest for lost-time injury rates among 16 Ontario sectors since 2009 with female healthcare workers ranked the highest among all occupations for lost-time claims. There is a great deal of focus in Ontario's occupational health and safety system on compliance and fines, however despite this increased focus, the injury statistics are not significantly improving. One of the keys to changing this trend is the development of a culture of healthy and safe workplaces including the effective utilization of leading indicators within Occupational Health and Safety Management Systems (OHSMSs). In contrast to lagging indicators, which focus on outcomes retrospectively, a leading indicator is associated with proactive activities and consists of selected OHSMSs program elements. Using leading indicators to measure health and safety has been common practice in high-risk industries; however, this shift has not occurred in healthcare. The aim of this project is to conduct a longitudinal study implementing six elements of the Ontario Safety Association for Community and Healthcare (OSACH) system identified as leading indicators and evaluating the effectiveness of this intervention on improving selected health and safety workplace indicators. A quasi-experimental longitudinal research design will be used within two Ontario acute care hospitals. The first phase of the study will focus on assessing current OHSMSs using the leading indicators, determining potential facilitators and barriers to changing current OHSMSs, and identifying the leading indicators that could be added or changed to the existing OHSMS in place. Phase I will conclude with the development of an intervention designed to support optimizing current OHSMSs in participating hospitals based on identified gaps. Phase II will pilot test and evaluate the tailored

  1. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  2. Effective Time Management in the Project Office. Executive Summary.

    DTIC Science & Technology

    1976-11-05

    manager. It can be concluded from the study that project managers have difficulty in managing their time and that although neglected, time management should...be taught to project managers so as to preclude spending an inordinate amount of time to accomplish their job. An understanding and use of the time ... management principles delineated in the study should allow the manager to make much more effective use of his available time. (Author)

  3. Using electronic document management systems to manage highway project files.

    DOT National Transportation Integrated Search

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  4. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  5. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  6. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  7. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  8. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  9. SAFETY AT FLUOR HANFORD (A) CASE STUDY - PREPARED BY THUNDERBIRD SCHOOL OF GLOBAL MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ARNOLD LD

    2009-09-25

    By November of 1997, Fluor Hanford (Fluor) had been the site manager of the Hanford nuclear reservation for a year. The Hanford site had been established as part of the Manhattan Project in the 1940s that gave birth to the atomic bomb. Hanford produced two thirds of U.S. plutonium during the Cold War period. The Hanford site was half the size of Rhode Island and occupied 586 square miles in southeastern Washington State. The production of plutonium for more than 40 years left a huge legacy of chemical and radiological contamination: 80 square miles of contaminated groundwater; 2,300 tons ofmore » spent nuclear fuel stored in underwater basins; 20 tons of plutonium-laced contaminated materials; and 500 contaminated facilities. The cleanup involved a challenging combination of radioactive material handling within an infrastructure constructed in the 1940s and 1950s. The cleanup that began in 1988 was expected to take 30 years or more. Improving safety at Hanford had already proven to be a significant challenge. As the new site manager at Hanford, Fluor Hanford inherited lower- and mid-level managers and thousands of unionized employees, many of whom were second or third generation Hanford employees. These employees had seen many contractors come and go over the years. Some of the managers who had worked with the previous contractor saw Fluor's emphasis on safety as getting in the way of operations. Union-management relations were fractious. Hanford's culture was described as 'production driven-management told everyone what to do, and, if you didn't do it, there were consequences'. Worker involvement in designing and implementing safety programs was negligible. Fluor Hanford also was having trouble satisfying its client, the Department of Energy (DOE). The DOE did not see a clear path forward for performance improvements at Hanford. Clearly, major change was necessary, but how and where should it be implemented?« less

  10. Managing risks in the project pipeline.

    DOT National Transportation Integrated Search

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  11. Safety management and public spaces: restoring balance.

    PubMed

    Ball, David J; Ball-King, Laurence

    2013-05-01

    Since 2000, the reputation of health and safety in the United Kingdom has been tarnished, so much so that it has become the subject of both a media circus and a government inquiry. This not only threatens the worthy goals of health and safety, but also impacts upon the associated tool of risk assessment itself such that "risk assessment" is increasingly seen by the public at large as a term inviting ridicule, even abuse. The main thrust of the government's examination of health and safety has been its concern that safety requirements were placing a disproportionate burden on business. However, there is another source of discontent, which is public chagrin over the impact of injury control measures upon life beyond the conventional workplace, in particular upon the public spaces that people frequent in their leisure time and on the activities they engage in there. This article provides a perspective on this second dimension of the crisis in confidence. It describes how many U.K. agencies with responsibilities for a wide portfolio of public amenities ranging from the provision of play spaces for the young to the management of publicly accessible countryside, the maintenance of urban and rural trees, the stewardship of sites of cultural heritage, and the pursuit of outdoor educational activities have responded to some conflicts posed to their services by the new safety culture. It concludes with a discussion of implications for the management of public space and for risk assessment itself. © 2012 Society for Risk Analysis.

  12. System Safety in an IT Service Organization

    NASA Astrophysics Data System (ADS)

    Parsons, Mike; Scutt, Simon

    Within Logica UK, over 30 IT service projects are considered safetyrelated. These include operational IT services for airports, railway infrastructure asset management, nationwide radiation monitoring and hospital medical records services. A recent internal audit examined the processes and documents used to manage system safety on these services and made a series of recommendations for improvement. This paper looks at the changes and the challenges to introducing them, especially where the service is provided by multiple units supporting both safety and non-safety related services from multiple locations around the world. The recommendations include improvements to service agreements, improved process definitions, routine safety assessment of changes, enhanced call logging, improved staff competency and training, and increased safety awareness. Progress is reported as of today, together with a road map for implementation of the improvements to the service safety management system. A proposal for service assurance levels (SALs) is discussed as a way forward to cover the wide variety of services and associated safety risks.

  13. Evolution from safety management system (SMS) to HSE MS: Incorporating health aspects into the HSE management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jong, G. de

    1996-12-31

    There is increasing recognition within the E&P industry that protection and promotion of the health of people at work is more than taking care of individual health. It is an organizational issue which can be managed using the same principles as for safety and environment. The synergy`s with safety and environmental management provide the link with the management system. However line managers need to under the critical Health issues: what are they are they relevant? How do we manage them? what are the standards? What are the management tools to be used? How do we monitor performance? What is themore » role of the line? What is the role of the health advisers? What training and competencies are needed for health management? What are the benefits? These questions have to be clarified before acceptance can be achieved for full integration of Health aspects into the HSE Management System. Health Risk Assessment was developed as a tool for systematic identification and assessment of health hazards and risks. It specifies the need for and type of controls and recovery measures, which can subsequently be incorporated in HSE Management System and HSE Cases. Our experience to date indicates that Health can successfully be integrated in HSE Management Systems and HSE Cases by using the same principles as developed for Safety Management Systems and Safety Cases. There are still many problems which need to be addressed but the methodology used appears to be sound and will eventually enhance line management understanding of the health management aspects relevant to the E&P Industry.« less

  14. Safety evaluation of access management policies and techniques, TechBrief

    DOT National Transportation Integrated Search

    2015-08-01

    Access management is the process that provides (or manages) access to land development while simultaneously preserving the flow of traffic on the surrounding road network for safety, capacity, and speed. Access management provides important benefits ...

  15. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  16. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... public comment on data and information concerning the Pre-Authorization Safety Audits (PASAs) for two motor carriers that applied to participate in the Agency's long-haul pilot program to test and...

  17. Engineered nanomaterials: toward effective safety management in research laboratories.

    PubMed

    Groso, Amela; Petri-Fink, Alke; Rothen-Rutishauser, Barbara; Hofmann, Heinrich; Meyer, Thierry

    2016-03-15

    It is still unknown which types of nanomaterials and associated doses represent an actual danger to humans and environment. Meanwhile, there is consensus on applying the precautionary principle to these novel materials until more information is available. To deal with the rapid evolution of research, including the fast turnover of collaborators, a user-friendly and easy-to-apply risk assessment tool offering adequate preventive and protective measures has to be provided. Based on new information concerning the hazards of engineered nanomaterials, we improved a previously developed risk assessment tool by following a simple scheme to gain in efficiency. In the first step, using a logical decision tree, one of the three hazard levels, from H1 to H3, is assigned to the nanomaterial. Using a combination of decision trees and matrices, the second step links the hazard with the emission and exposure potential to assign one of the three nanorisk levels (Nano 3 highest risk; Nano 1 lowest risk) to the activity. These operations are repeated at each process step, leading to the laboratory classification. The third step provides detailed preventive and protective measures for the determined level of nanorisk. We developed an adapted simple and intuitive method for nanomaterial risk management in research laboratories. It allows classifying the nanoactivities into three levels, additionally proposing concrete preventive and protective measures and associated actions. This method is a valuable tool for all the participants in nanomaterial safety. The users experience an essential learning opportunity and increase their safety awareness. Laboratory managers have a reliable tool to obtain an overview of the operations involving nanomaterials in their laboratories; this is essential, as they are responsible for the employee safety, but are sometimes unaware of the works performed. Bringing this risk to a three-band scale (like other types of risks such as biological, radiation

  18. Managing Complex Distance Education Projects in a Telework Environment

    ERIC Educational Resources Information Center

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  19. Project Management Using Modern Guidance, Navigation and Control Theory

    NASA Technical Reports Server (NTRS)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state

  20. Transportation engineering project management : survey of practice.

    DOT National Transportation Integrated Search

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  1. Simple Tools to Facilitate Project Management of a Nursing Research Project.

    PubMed

    Aycock, Dawn M; Clark, Patricia C; Thomas-Seaton, LaTeshia; Lee, Shih-Yu; Moloney, Margaret

    2016-07-01

    Highly organized project management facilitates rigorous study implementation. Research involves gathering large amounts of information that can be overwhelming when organizational strategies are not used. We describe a variety of project management and organizational tools used in different studies that may be particularly useful for novice researchers. The studies were a multisite study of caregivers of stroke survivors, an Internet-based diary study of women with migraines, and a pilot study testing a sleep intervention in mothers of low-birth-weight infants. Project management tools were used to facilitate enrollment, data collection, and access to results. The tools included protocol and eligibility checklists, event calendars, screening and enrollment logs, instrument scoring tables, and data summary sheets. These tools created efficiency, promoted a positive image, minimized errors, and provided researchers with a sense of control. For the studies described, there were no protocol violations, there were minimal missing data, and the integrity of data collection was maintained. © The Author(s) 2016.

  2. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  3. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    NASA Astrophysics Data System (ADS)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  4. 77 FR 34051 - Drug Safety and Risk Management Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ...] Drug Safety and Risk Management Advisory Committee; Notice of Meeting AGENCY: Food and Drug...: Drug Safety and Risk Management Advisory Committee. General Function of the Committee: To provide... comments to http://www.regulations.gov . Submit written comments to the Division of Dockets Management (HFA...

  5. Traffic and safety management needs in Virginia.

    DOT National Transportation Integrated Search

    1979-01-01

    A survey questionnaire was developed to identify traffic operations and safety management needs in Virginia. Form A of the questionnaire was mailed to 79 traffic engineering practitioners throughout Virginia and Form B was mailed to 78 law enforcemen...

  6. Learning the ABCs (of Project Management)

    NASA Technical Reports Server (NTRS)

    Frandsen, Allan

    2003-01-01

    To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

  7. Risk Management in Construction Project: Taking Fairness into Account

    NASA Astrophysics Data System (ADS)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  8. 75 FR 57898 - NIST Blue Ribbon Commission on Management and Safety-II

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology NIST Blue Ribbon Commission... Commerce. ACTION: Notice of establishment of the NIST Blue Ribbon Commission on Management and Safety--II... NIST Blue Ribbon Commission on Management and Safety--II ``Commission''. The Commission will assess...

  9. The use of GIS tools for road infrastructure safety management

    NASA Astrophysics Data System (ADS)

    Budzyński, Marcin; Kustra, Wojciech; Okraszewska, Romanika; Jamroz, Kazimierz; Pyrchla, Jerzy

    2018-01-01

    There are many factors that influence accidents and their severity. They can be grouped within the system of man, vehicle and environment. The article focuses on how GIS tools can be used to manage road infrastructure safety. To ensure a better understanding and identification of road factors, GIS tools help with the acquisition of road parameter data. Their other role is helping with a clear and effective presentation of risk ranking. GIS is key to identifying high-risk sections and supports the effective communication of safety levels. This makes it a vital element of safety management. The article describes the use of GIS for the collection and visualisation of road parameter data which are not available in any of the existing databases, i.e. horizontal curve parameters. As we know from research and statistics, they are important factors that determine the safety of road infrastructure. Finally, new research is proposed as well as the possibilities for applying GIS tools for the purposes of road safety inspection.

  10. The Environmental Health/Home Safety Education Project: a successful and practical U.S.-Mexico border initiative.

    PubMed

    Forster-Cox, Susan C; Mangadu, Thenral; Jacquez, Benjamín; Fullerton, Lynne

    2010-05-01

    The Environmental Health/Home Safety Education Project (Proyecto de Salud Ambiental y Seguridad en el Hogar) has been developed in response to a wide array of severe and often preventable environmental health issues occurring in and around homes on the U.S.-Mexico border. Utilizing well-trained community members, called promotoras , homes are visited and assessed for potential environmental hazards, including home fire and food safety issues. Data analyzed from project years 2002 to 2005 shows a significant impact in knowledge levels and initial behavior change among targeted participants as it relates to fire and food safety issues. Since the initiation of the project in 1999, hundreds of participants have improved their quality of life by making their homes safer. The project has proven to be sustainable, replicable, flexible, and attractive to funders.

  11. Industrial Program of Waste Management - Cigeo Project - 13033

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butez, Marc; Bartagnon, Olivier; Gagner, Laurent

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operationalmore » and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)« less

  12. Workplace road safety risk management: An investigation into Australian practices.

    PubMed

    Warmerdam, Amanda; Newnam, Sharon; Sheppard, Dianne; Griffin, Mark; Stevenson, Mark

    2017-01-01

    In Australia, more than 30% of the traffic volume can be attributed to work-related vehicles. Although work-related driver safety has been given increasing attention in the scientific literature, it is uncertain how well this knowledge has been translated into practice in industry. It is also unclear how current practice in industry can inform scientific knowledge. The aim of the research was to use a benchmarking tool developed by the National Road Safety Partnership Program to assess industry maturity in relation to risk management practices. A total of 83 managers from a range of small, medium and large organisations were recruited through the Victorian Work Authority. Semi-structured interviews aimed at eliciting information on current organisational practices, as well as policy and procedures around work-related driving were conducted and the data mapped onto the benchmarking tool. Overall, the results demonstrated varying levels of maturity of risk management practices across organisations, highlighting the need to build accountability within organisations, improve communication practices, improve journey management, reduce vehicle-related risk, improve driver competency through an effective workplace road safety management program and review organisational incident and infringement management. The findings of the study have important implications for industry and highlight the need to review current risk management practices. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Knowledge, Attitude and Practice of Healthcare Managers to Medical Waste Management and Occupational Safety Practices: Findings from Southeast Nigeria.

    PubMed

    Anozie, Okechukwu Bonaventure; Lawani, Lucky Osaheni; Eze, Justus Ndulue; Mamah, Emmanuel Johnbosco; Onoh, Robinson Chukwudi; Ogah, Emeka Onwe; Umezurike, Daniel Akuma; Anozie, Rita Onyinyechi

    2017-03-01

    Awareness of appropriate waste management procedures and occupational safety measures is fundamental to achieving a safe work environment, and ensuring patient and staff safety. This study was conducted to assess the attitude of healthcare managers to medical waste management and occupational safety practices. This was a cross-sectional study conducted among 54 hospital administrators in Ebonyi state. Semi-structured questionnaires were used for qualitative data collection and analyzed with SPSS statistics for windows (2011), version 20.0 statistical software (Armonk, NY: IBM Corp). Two-fifth (40%) of healthcare managers had received training on medical waste management and occupational safety. Standard operating procedure of waste disposal was practiced by only one hospital (1.9%), while 98.1% (53/54) practiced indiscriminate waste disposal. Injection safety boxes were widely available in all health facilities, nevertheless, the use of incinerators and waste treatment was practiced by 1.9% (1/54) facility. However, 40.7% (22/54) and 59.3% (32/54) of respondents trained their staff and organize safety orientation courses respectively. Staff insurance cover was offered by just one hospital (1.9%), while none of the hospitals had compensation package for occupational hazard victims. Over half (55.6%; 30/54) of the respondents provided both personal protective equipment and post exposure prophylaxis for HIV. There was high level of non-compliance to standard medical waste management procedures, and lack of training on occupational safety measures. Relevant regulating agencies should step up efforts at monitoring and regulation of healthcare activities and ensure staff training on safe handling and disposal of hospital waste.

  14. A success paradigm for project managers in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Bauer, Barry Jon

    Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.

  15. An Examination of Assistant Professors' Project Management Practices

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson; Hartshorne, Richard

    2013-01-01

    Purpose: The purpose of this research was to identify factors that influence the use of project management in higher education research projects by investigating the project management practices of assistant professors. Design/methodology/approach: Using a grounded theory approach that included in-depth, semi-structured interviews with 22…

  16. NASA Space Flight Program and Project Management Handbook

    NASA Technical Reports Server (NTRS)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  17. Quality, risk management and patient safety: the challenge of effective integration.

    PubMed

    França, Margarida

    2008-01-01

    Nowadays we observe the development of three waves of intervention and change within healthcare services: quality management, risk management and patient safety. The Patient Safety movement has been launched at international level as a consequence of the Institute of Medicine's report--To Err is Human, and today patient safety constitutes one basic dimension of health quality subjected to the direct intervention of supranational entities (WHO, EU) and Member States' Governments. The objective of this paper is to raise awareness about the value of quality improvement (QI) methodologies and tools to sustainable healthcare quality outcomes.

  18. Time management for preclinical safety professionals.

    PubMed

    Wells, Monique Y

    2010-08-01

    A survey about time management in the workplace was distributed to obtain a sense of the level of job satisfaction among preclinical safety professionals in the current economic climate, and to encourage reflection upon how we manage time in our work environment. Roughly equal numbers of respondents (approximately 32%) identified themselves as management or staff, and approximately 27% indicated that they are consultants. Though 45.2% of respondents indicated that time management is very challenging for the profession in general, only 36.7% find it very challenging for themselves. Ten percent of respondents view time management to be exceedingly challenging for themselves. Approximately 34% of respondents indicated that prioritization of tasks was the most challenging aspect of time management for them. Focusing on an individual task was the second most challenging aspect (26%), followed equally by procrastination and delegation of tasks (12.4%). Almost equal numbers of respondents said that they would (35.2%) or might (33.3%) undertake training to improve their time management skills. Almost equal numbers of participants responded "perhaps" (44.6%) or "yes" (44.2%) to the question of whether management personnel should be trained in time management.

  19. The Human Element of Project Management

    ERIC Educational Resources Information Center

    Gillard, Sharlett

    2017-01-01

    Much research and dialogue have been published about project management. Studies have been conducted regarding the impact of size, member location, gender composition, cross-functional structure, stakeholder influence, confidence issues, technology usage, management style, generational differences, technical expertise vs. people skills, and a…

  20. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    NASA Astrophysics Data System (ADS)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  1. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  2. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume III. Project environmental/health/safety/ and socioeconomic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less

  3. NASA's Software Safety Standard

    NASA Technical Reports Server (NTRS)

    Ramsay, Christopher M.

    2007-01-01

    requirements. This allows the projects leeway to meet these requirements in many forms that best suit a particular project's needs and safety risk. In other words, it tells the project what to do, not how to do it. This update also incorporated advances in the state of the practice of software safety from academia and private industry. It addresses some of the more common issues now facing software developers in the NASA environment such as the use of Commercial-Off-the-Shelf Software (COTS), Modified OTS (MOTS), Government OTS (GOTS), and reused software. A team from across NASA developed the update and it has had both NASA-wide internal reviews by software engineering, quality, safety, and project management. It has also had expert external review. This presentation and paper will discuss the new NASA Software Safety Standard, its organization, and key features. It will start with a brief discussion of some NASA mission failures and incidents that had software as one of their root causes. It will then give a brief overview of the NASA Software Safety Process. This will include an overview of the key personnel responsibilities and functions that must be performed for safety-critical software.

  4. Project Management in Instructional Design: ADDIE Is Not Enough

    ERIC Educational Resources Information Center

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  5. Leveraging Text Content for Management of Construction Project Documents

    ERIC Educational Resources Information Center

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  6. JPL Year 2000 Project. A Project Manager's Observations: Y2k

    NASA Technical Reports Server (NTRS)

    Mathison, Richard P. (Technical Monitor)

    1999-01-01

    This paper presents observations from a project manager on the Y2K problem. The topics include: 1) Agenda: 2) Scope; 3) Project Organization; 4) The Fixes; 5) The Toughest Part; 6) Validation versus Time; and 7) Information Sources. This paper is in viewgraph form.

  7. Data Management Challenges in a National Scientific Program of 55 Diverse Research Projects

    NASA Astrophysics Data System (ADS)

    De Bruin, T.

    2016-12-01

    In 2007-2015, the Dutch funding agency NWO funded the National Ocean and Coastal Research Program (in Dutch: ZKO). This program focused on `the scientific analysis of five societal challenges related to a sustainable use of the sea and coastal zones'. These five challenges were safety, economic yield, nature, spatial planning & development and water quality. The ZKO program was `set up to strengthen the cohesion and collaboration within Dutch marine research'. From the start of the program, data management was addressed, to allow data to be shared amongst the, diverse, research projects. The ZKO program was divided in 4 different themes (or regions). The `Carrying Capacity' theme was subdivided into 3 `research lines': Carrying capacity (Wadden Sea) - Policy-relevant Research - Monitoring - Hypothesis-driven Research Oceans North Sea Transnational Wadden Sea Research 56 Projects were funded, ranging from studies on the governance of the Wadden Sea to expeditions studying trace elements in the Atlantic Ocean. One of the first projects to be funded was the data management project. Its objectives were to allow data exchange between projects, to archive all relevant data from all ZKO projects and to make the data and publications publicly available, following the ZKO Data Policy. This project was carried out by the NIOZ Data Management Group. It turned out that the research projects had hardly any interest in sharing data between projects and had good (?) arguments not to share data at all until the end of the projects. A data portal was built, to host and make available all ZKO data and publications. When it came to submitting the data to this portal, most projects obliged willingly, though found it occasionally difficult to find time to do so. However, some projects refused to submit data to an open data portal, despite the rules set up by the funding agency and agreed by all. The take-home message of this presentation is that data sharing is a cultural and

  8. 41 CFR 102-80.10 - What are the basic safety and environmental management policies for real property?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... safety and environmental management policies for real property? 102-80.10 Section 102-80.10 Public... MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT General Provisions § 102-80.10 What are the basic safety and environmental management policies for real property? The basic safety and...

  9. Comparing Occupational Health and Safety Management System Programming with Injury Rates in Poultry Production.

    PubMed

    Autenrieth, Daniel A; Brazile, William J; Douphrate, David I; Román-Muñiz, Ivette N; Reynolds, Stephen J

    2016-01-01

    Effective methods to reduce work-related injuries and illnesses in animal production agriculture are sorely needed. One approach that may be helpful for agriculture producers is the adoption of occupational health and safety management systems. In this replication study, the authors compared the injury rates on 32 poultry growing operations with the level of occupational health and safety management system programming at each farm. Overall correlations between injury rates and programming level were determined, as were correlations between individual management system subcomponents to ascertain which parts might be the most useful for poultry producers. It was found that, in general, higher levels of occupational health and safety management system programming were associated with lower rates of workplace injuries and illnesses, and that Management Leadership was the system subcomponent with the strongest correlation. The strength and significance of the observed associations were greater on poultry farms with more complete management system assessments. These findings are similar to those from a previous study of the dairy production industry, suggesting that occupational health and safety management systems may hold promise as a comprehensive way for producers to improve occupational health and safety performance. Further research is needed to determine the effectiveness of such systems to reduce farm work injuries and illnesses. These results are timely given the increasing focus on occupational safety and health management systems.

  10. Correlational Study of Risk Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  12. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.

  13. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  14. Instructional Design and Project Management: Complementary or Divergent?

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  15. 76 FR 25278 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... safety zone during the construction of the TriMet Bridge on the Willamette River, in Portland, OR. This..., will be starting construction of the new Portland-Milwaukie Light Rail Bridge on July 1, 2011 (with in...

  16. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators andmore » training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.« less

  17. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  18. Evaluation and review of the safety management system implementation in the Royal Thai Air Force

    NASA Astrophysics Data System (ADS)

    Chaiwan, Sakkarin

    This study was designed to determine situation and effectiveness of the safety management system currently implemented in the Royal Thai Air Force. Reviewing the ICAO's SMS and the RTAF's SMS was conducted to identify similarities and differences between the two safety management systems. Later, the researcher acquired safety statistics from the RTAF Safety Center to investigate effectiveness of its safety system. The researcher also collected data to identify other factors affecting effectiveness of the safety system during conducting in-depth interviews. Findings and Conclusions: The study shows that the Royal Thai Air Force has never applied the International Civil Aviation Organization's Safety management System to its safety system. However, the RTAF's SMS and the ICAO's SMS have been developed based on the same concepts. These concepts are from Richard H. Woods's book, Aviation safety programs: A management handbook. However, the effectiveness of the Royal Thai Air Force's safety system is in good stance. An accident rate has been decreasing regularly but there are no known factors to describe the increasing rate, according to the participants' opinion. The participants have informed that there are many issues to be resolved to improve the RTAF's safety system. Those issues are cooperation among safety center's staffs, attitude toward safety of the RTAF senior commanders, and safety standards.

  19. [Patient safety culture in directors and managers of a health service].

    PubMed

    Giménez-Júlvez, Teresa; Hernández-García, Ignacio; Aibar-Remón, Carlos; Gutiérrez-Cía, Isabel; Febrel-Bordejé, Mercedes

    To assess patient safety culture in directors/managers. Cross-sectional descriptive study carried out from February to June 2011 among the executive/managing staff of the Aragón Health Service through semi-structured interviews. A total of 12 interviews were carried out. All the respondents admitted that there were many patient safety problems and agreed that patient safety was a priority from a theoretical rather than practical perspective. The excessive changes in executive positions was considered to be an important barrier which made it difficult to establish long-term strategies and achieve medium-term continuity. This study recorded perceptions on patient safety culture in directors, an essential factor to improve patient safety culture in this group and in the organisations they run. Copyright © 2017 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  20. 77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... vessels from the hazards associated with the demolition project on the Cline Avenue bridge, which are...