Sample records for safety project task

  1. MANAGING UNCERTAINTIES ASSOCIATED WITH RADIOACTIVE WASTE DISPOSAL: TASK GROUP 4 OF THE IAEA PRISM PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seitz, R.

    2011-03-02

    It is widely recognized that the results of safety assessment calculations provide an important contribution to the safety arguments for a disposal facility, but cannot in themselves adequately demonstrate the safety of the disposal system. The safety assessment and a broader range of arguments and activities need to be considered holistically to justify radioactive waste disposal at any particular site. Many programs are therefore moving towards the production of what has become known as a Safety Case, which includes all of the different activities that are conducted to demonstrate the safety of a disposal concept. Recognizing the growing interest inmore » the concept of a Safety Case, the International Atomic Energy Agency (IAEA) is undertaking an intercomparison and harmonization project called PRISM (Practical Illustration and use of the Safety Case Concept in the Management of Near-surface Disposal). The PRISM project is organized into four Task Groups that address key aspects of the Safety Case concept: Task Group 1 - Understanding the Safety Case; Task Group 2 - Disposal facility design; Task Group 3 - Managing waste acceptance; and Task Group 4 - Managing uncertainty. This paper addresses the work of Task Group 4, which is investigating approaches for managing the uncertainties associated with near-surface disposal of radioactive waste and their consideration in the context of the Safety Case. Emphasis is placed on identifying a wide variety of approaches that can and have been used to manage different types of uncertainties, especially non-quantitative approaches that have not received as much attention in previous IAEA projects. This paper includes discussions of the current results of work on the task on managing uncertainty, including: the different circumstances being considered, the sources/types of uncertainties being addressed and some initial proposals for approaches that can be used to manage different types of uncertainties.« less

  2. Reaping the benefits of task conflict in teams: the critical role of team psychological safety climate.

    PubMed

    Bradley, Bret H; Postlethwaite, Bennett E; Klotz, Anthony C; Hamdani, Maria R; Brown, Kenneth G

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance. Using evidence from 117 project teams, the present research found that psychological safety climate moderates the relationship between task conflict and performance. Specifically, task conflict and team performance were positively associated under conditions of high psychological safety. The results support the conclusion that psychological safety facilitates the performance benefits of task conflict in teams. Theoretical implications and suggestions for future research are discussed.

  3. Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miraglia, R.A.; Chartrand, A.W.

    1997-05-01

    The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, themore » tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.« less

  4. Safety analysis of patient transfers and handling tasks.

    PubMed

    Vieira, Er; Kumar, S

    2009-10-01

    Low-back disorders are related to biomechanical demands, and nurses are among the professionals with the highest rates. Quantification of risk factors is important for safety assessment and reduction of low-back disorders. This study aimed to quantify physical demands of frequent nursing tasks and provide evidence-based recommendations to increase low-back safety. Thirty-six volunteer female nurses participated in a cross-sectional study of nine nursing tasks. Lumbar range of motion (ROM) and motion during nursing tasks were measured. Compression and shear forces at L5/S1, ligament strain and percentage of population without sufficient torso strength to perform 14 phases of nine nursing tasks were estimated. Peak flexions during trolley-to-bed, bed-to-chair and chair-to-bed transfers reached the maximum flexion ROM of the nurses. Average lumbar flexion during trolley-to-bed transfers was >50% of flexion ROM, being higher than during all other tasks. Mean (SD) compression at L5/S1 (4754 N (437 N)) and population without sufficient torso strength (37% (9%)) were highest during the pushing phase of bed-to-trolley transfers. Shear force (487 N (40 N)) and ligament strain (14% (5%)) were highest during the pulling phase of trolley-to-bed transfers. Nursing tasks impose high biomechanical demands on the lumbar spine. Excessive lumbar flexion and forces are critical aspects of manual transfers requiring most of the nurses' capabilities. Evidence-based recommendations to improve low-back safety in common nursing tasks were provided. Fitness to work, job modifications and training programs can now be designed and assessed based on the results.

  5. Systemic safety project selection tool.

    DOT National Transportation Integrated Search

    2013-07-01

    "The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...

  6. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  7. The Washington State Task Force on Student Transportation Safety. Final Report.

    ERIC Educational Resources Information Center

    Washington State Legislature, Olympia.

    Findings of a study conducted by the Washington State Task Force on Student Transportation Safety are presented in this report. The data-collection process involved four phases: meetings with experts in student transportation and pedestrian safety; public meetings, informational work sessions, and tours of problems areas; task force meetings; and…

  8. Patterns in Safety-Related Projects

    NASA Astrophysics Data System (ADS)

    Parsons, Mike; Hunter, Charles

    Within Logica UK, safety-related projects are run in a variety of ways depending on the constraints imposed and how the risks and mitigations are owned and handled. A total of eight different types of project development patterns have been identified and this paper discusses each type. A simple decision tool has been developed based on the patterns which is used as an aid in deciding how to bid a safety project, allowing tradeoffs between risk ownership, development methods and cost to be assessed.

  9. Research on safety evaluation model for in-vehicle secondary task driving.

    PubMed

    Jin, Lisheng; Xian, Huacai; Niu, Qingning; Bie, Jing

    2015-08-01

    This paper presents a new method for evaluating in-vehicle secondary task driving safety. There are five in-vehicle distracter tasks: tuning the radio to a local station, touching the touch-screen telephone menu to a certain song, talking with laboratory assistant, answering a telephone via Bluetooth headset, and finding the navigation system from Ipad4 computer. Forty young drivers completed the driving experiment on a driving simulator. Measures of fixations, saccades, and blinks are collected and analyzed. Based on the measures of driver eye movements which have significant difference between the baseline and secondary task driving conditions, the evaluation index system is built. The Analytic Network Process (ANP) theory is applied for determining the importance weight of the evaluation index in a fuzzy environment. On the basis of the importance weight of the evaluation index, Fuzzy Comprehensive Evaluation (FCE) method is utilized to evaluate the secondary task driving safety. Results show that driving with secondary tasks greatly distracts the driver's attention from road and the evaluation model built in this study could estimate driving safety effectively under different driving conditions. Crown Copyright © 2014. Published by Elsevier Ltd. All rights reserved.

  10. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    Hogarth, P. T.

    1976-01-01

    Technology utilization projects in the area of urban construction and safety included the following: development of undercarpet and baseboard flat conductor cables, flood insurance studies, tornado safety engineering, the Project TECH house at the Langley Research Center, assistance to the City of Atlanta in their environmental habitability and resource allocation program, and market assessment of a solid state diesel engine controller. The flat conductor cable and the flood insurance studies are given particular attention.

  11. San Joaquin River Up-Stream DO TMDL Project Task 4: MonitoringStudy Interim Task Report #3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stringfellow, William; Borglin, Sharon; Dahlgren, Randy

    2007-03-30

    The purpose of the Dissolved Oxygen Total Maximum Daily LoadProject (DO TMDLProject) is to provide a comprehensive understanding ofthe sources and fate of oxygen consuming materials in the San JoaquinRiver (SJR) watershed between Channel Point and Lander Avenue (upstreamSJR). When completed, this study will provide the stakeholders anunderstanding of the baseline conditions of the basin, provide input foran allocation decision, and provide the stakeholders with a tool formeasuring the impact of any waterquality management program that may beimplemented as part of the DO TMDL process. Previous studies haveidentified algal biomass as the most significant oxygen-demandingsubstance in the DO TMDL Projectmore » study-area between of Channel Point andLander Ave onthe SJR. Other oxygen-demanding substances found in theupstream SJR include ammonia and organic carbon from sources other thanalgae. The DO TMDL Project study-area contains municipalities, dairies,wetlands, cattle ranching, irrigated agriculture, and industries thatcould potentially contribute biochemical oxygen demand (BOD) to the SJR.This study is designed to discriminate between algal BOD and othersources of BOD throughout the entire upstream SJR watershed. Algalbiomass is not a conserved substance, but grows and decays in the SJR;hence, characterization of oxygen-demanding substances in the SJR isinherently complicated and requires an integrated effort of extensivemonitoring, scientific study, and modeling. In order to achieve projectobjectives, project activities were divided into a number of Tasks withspecific goals and objectives. In this report, we present the results ofmonitoring and research conducted under Task 4 of the DO TMDL Project.The major objective of Task 4 is to collect sufficient hydrologic (flow)and water quality (WQ) data to characterize the loading of algae, otheroxygen-demanding materials, and nutrients fromindividual tributaries andsub-watersheds of the upstream SJR between Mossdale

  12. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, C. M.

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  13. Task Listings Resulting from the Vocational Competency Measures Project. Memorandum Report.

    ERIC Educational Resources Information Center

    American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.

    This memorandum report consists of 14 task listings resulting from the Vocational Competency Measures Project. (The Vocational Competency Measures Project was a test development project that involved the writing and verification of task listings for 14 vocational occupational areas through over 225 interviews conducted in 27 states.) Provided in…

  14. Preoperative Safety Briefing Project

    PubMed Central

    DeFontes, James; Surbida, Stephanie

    2004-01-01

    Context: Increased media attention on surgical procedures that were performed on the wrong anatomic site or wrong patient has prompted the health care industry to identify and address human factors that lead to medical errors. Objective: To increase patient safety in the perioperative setting, our objective was to create a climate of improved communication, collaboration, team-work, and situational awareness while the surgical team reviewed pertinent information about the patient and the pending procedure. Methods: A team of doctors, nurses, and technicians used human factors principles to develop the Preoperative Safety Briefing for use by surgical teams, a briefing similar to the preflight checklist used by the airline industry. A six-month pilot of the briefing began in the Kaiser Permanente (KP) Anaheim Medical Center in February 2002. Four indicators of safety culture were used to measure success of the pilot: occurrence of wrong-site/wrong procedures, attitudinal survey data, near-miss reports, and nursing personnel turnover data. Results: Wrong-site surgeries decreased from 3 to 0 (300%) per year; employee satisfaction increased 19%; nursing personnel turnover decreased 16%; and perception of the safety climate in the operating room improved from “good” to “outstanding.” Operating suite personnel perception of teamwork quality improved substantially. Operating suite personnel perception of patient safety as a priority, of personnel communication, of their taking responsibility for patient safety, of nurse input being well received, of overall morale, and of medical errors being handled appropriately also improved substantially. Conclusions: Team members who work together and communicate well can quickly detect and more easily avoid errors. The Preoperative Safety Briefing is now standard in many operating suites in the KP Orange County Service Area. The concepts and design of this project are transferable, and similar projects are underway in the

  15. NASA's Aviation Safety and Modeling Project

    NASA Technical Reports Server (NTRS)

    Chidester, Thomas R.; Statler, Irving C.

    2006-01-01

    The Aviation Safety Monitoring and Modeling (ASMM) Project of NASA's Aviation Safety program is cultivating sources of data and developing automated computer hardware and software to facilitate efficient, comprehensive, and accurate analyses of the data collected from large, heterogeneous databases throughout the national aviation system. The ASMM addresses the need to provide means for increasing safety by enabling the identification and correcting of predisposing conditions that could lead to accidents or to incidents that pose aviation risks. A major component of the ASMM Project is the Aviation Performance Measuring System (APMS), which is developing the next generation of software tools for analyzing and interpreting flight data.

  16. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  17. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    NASA Astrophysics Data System (ADS)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  18. The Development of Project Orion Ground Safety Requirements

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul; Condzella, Bill; Williams, Jeff

    2011-01-01

    In spite of a very compressed schedule, Project Orion's AFT safety team was able to pull together a comprehensive set of ground safety requirements using existing requirements and subject matter experts. These requirements will serve as the basis for the design of GSE and ground operations. Using the above lessons as a roadmap, new Projects can produce the same results. A rigorous set of ground safety requirements is required to assure ground support equipment (GSE) and associated flight hardware ground operations are conducted safety

  19. Evaluating Performance of Highway Safety Projects

    DOT National Transportation Integrated Search

    2016-12-01

    The purpose of this project was to investigate and document methods that the Idaho Transportation Department (ITD) and Local Highway Technical Assistance Council (LHTAC) can use to evaluate the performance of safety projects that have been implemente...

  20. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  1. Capturing Safety Requirements to Enable Effective Task Allocation Between Humans and Automaton in Increasingly Autonomous Systems

    NASA Technical Reports Server (NTRS)

    Neogi, Natasha A.

    2016-01-01

    There is a current drive towards enabling the deployment of increasingly autonomous systems in the National Airspace System (NAS). However, shifting the traditional roles and responsibilities between humans and automation for safety critical tasks must be managed carefully, otherwise the current emergent safety properties of the NAS may be disrupted. In this paper, a verification activity to assess the emergent safety properties of a clearly defined, safety critical, operational scenario that possesses tasks that can be fluidly allocated between human and automated agents is conducted. Task allocation role sets were proposed for a human-automation team performing a contingency maneuver in a reduced crew context. A safety critical contingency procedure (engine out on takeoff) was modeled in the Soar cognitive architecture, then translated into the Hybrid Input Output formalism. Verification activities were then performed to determine whether or not the safety properties held over the increasingly autonomous system. The verification activities lead to the development of several key insights regarding the implicit assumptions on agent capability. It subsequently illustrated the usefulness of task annotations associated with specialized requirements (e.g., communication, timing etc.), and demonstrated the feasibility of this approach.

  2. Vehicle Safety Communications project task 3 final report : identify intelligent vehicle safety applications enabled by DSRC

    DOT National Transportation Integrated Search

    2005-03-01

    The Crash Avoidance Metrics Partnership (CAMP) Vehicle Safety Communications Consortium (VSCC) comprised of BMW, DaimlerChrysler, Ford, GM, Nissan, Toyota, and Volkswagen, in partnership with USDOT, established the Vehicle Safety Communications (VSC)...

  3. Assessment of contributions to patient safety knowledge by the Agency for Healthcare Research and Quality-funded patient safety projects.

    PubMed

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-04-01

    To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)'s patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Information abstracted from proposals for projects funded in AHRQ's patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. The 234 projects funded through AHRQ's patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. The projects funded in AHRQ's patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results

  4. Relational approach in managing construction project safety: a social capital perspective.

    PubMed

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  5. Does compliance to patient safety tasks improve and sustain when radiotherapy treatment processes are standardized?

    PubMed

    Simons, Pascale A M; Houben, Ruud; Benders, Jos; Pijls-Johannesma, Madelon; Vandijck, Dominique; Marneffe, Wim; Backes, Huub; Groothuis, Siebren

    2014-10-01

    To realize safe radiotherapy treatment, processes must be stabilized. Standard operating procedures (SOP's) were expected to stabilize the treatment process and perceived task importance would increase sustainability in compliance. This paper presents the effects on compliance to safety related tasks of a process redesign based on lean principles. Compliance to patient safety tasks was measured by video recording of actual radiation treatment, before (T0), directly after (T1) and 1.5 years after (T2) a process redesign. Additionally, technologists were surveyed on perceived task importance and reported incidents were collected for three half-year periods between 2007 and 2009. Compliance to four out of eleven tasks increased at T1, of which improvements on three sustained (T2). Perceived importance of tasks strongly correlated (0.82) to compliance rates at T2. The two tasks, perceived as least important, presented low base-line compliance, improved (T1), but relapsed at T2. The reported near misses (patient-level not reached) on accelerators increased (P < 0.001) from 144 (2007) to 535 (2009), while the reported misses (patient-level reached) remained constant. Compliance to specific tasks increased after introducing SOP's and improvements sustained after 1.5 years, indicating increased stability. Perceived importance of tasks correlated positively to compliance and sustainability. Raising the perception of task importance is thus crucial to increase compliance. The redesign resulted in increased willingness to report incidents, creating opportunities for patient safety improvement in radiotherapy treatment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Assessment of Contributions to Patient Safety Knowledge by the Agency for Healthcare Research and Quality-Funded Patient Safety Projects

    PubMed Central

    Sorbero, Melony E S; Ricci, Karen A; Lovejoy, Susan; Haviland, Amelia M; Smith, Linda; Bradley, Lily A; Hiatt, Liisa; Farley, Donna O

    2009-01-01

    Objective To characterize the activities of projects funded in Agency for Healthcare Research and Quality (AHRQ)' patient safety portfolio and assess their aggregate potential to contribute to knowledge development. Data Sources Information abstracted from proposals for projects funded in AHRQ' patient safety portfolio, information on safety practices from the AHRQ Evidence Report on Patient Safety Practices, and products produced by the projects. Study Design This represented one part of the process evaluation conducted as part of a longitudinal evaluation based on the Context–Input–Process–Product model. Principal Findings The 234 projects funded through AHRQ' patient safety portfolio examined a wide variety of patient safety issues and extended their work beyond the hospital setting to less studied parts of the health care system. Many of the projects implemented and tested practices for which the patient safety evidence report identified a need for additional evidence. The funded projects also generated a substantial body of new patient safety knowledge through a growing number of journal articles and other products. Conclusions The projects funded in AHRQ' patient safety portfolio have the potential to make substantial contributions to the knowledge base on patient safety. The full value of this new knowledge remains to be confirmed through the synthesis of results. PMID:21456108

  7. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.

    PubMed

    Hasan, Abid; Jha, Kumar Neeraj

    2013-01-01

    Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.

  8. The Projected Impacts to Clark County and Local Governmental Public Safety Agencies Resulting from the Transportation of High-Level Nuclear Waste to Yucca Mountain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mushkatel, A.H.; Conway, S.; Navis, I.

    2006-07-01

    This paper focuses on the difficulties of projecting fiscal impacts to public safety agencies from the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. The efforts made by Clark County Nevada, to develop a fiscal model of impacts for public safety agencies are described in this paper. Some of the difficulties in constructing a fiscal model of impacts for the entire 24 year high-level nuclear waste transportation shipping campaign are identified, and a refined methodology is provided to accomplish this task. Finally, a comparison of the fiscal impact projections for public safety agencies that Clark County developed in 2001,more » with those done in 2005 is discussed, and the fiscal impact cost projections for the entire 24 year transportation campaign are provided. (authors)« less

  9. Advanced bridge safety initiative : FRP flexural retrofit for concrete slab bridges - task 4 deliverables.

    DOT National Transportation Integrated Search

    2014-06-01

    Concrete slab bridges are being examined as part of the MaineDOT Advanced Bridge Safety Initiative. Under Tasks : 1 3 a finite element analysis program is developed, validated and applied to twenty bridges. : Task 4 investigates and develops a no...

  10. Project FARE Task IV Report: Urban Mass Transportation Industry Financial and Operating Data Reporting System. Volume I. Task and Project Summary.

    DOT National Transportation Integrated Search

    1973-11-01

    The report contains a description of the uniform reporting system for the urban mass transit industry designed and tested in Project FARE. It is presented in five volumes. Volume I contains a description of how Task IV was accomplished and the conclu...

  11. Project safety as a sustainable competitive advantage.

    PubMed

    Rechenthin, David

    2004-01-01

    To be consistently profitable, a construction company must complete projects in scope, on schedule, and on budget. At the same time, the nature of the often high-risk work performed by construction companies can result in high accident rates. Clients and other stakeholders are placing increasing pressure on companies to decrease those accident rates. Clients routinely demand copies of safety plans and evidence of past results at the "pre-qualification" or "request for proposal" stages of the procurement process. Are high accident rates and the associated costs just a part of business? Companies that deliver on scope, schedule, and budget have a competitive advantage. Is it possible for projects with low accident rates to use it as a competitive advantage? Is the value added by safety just a temporary or parity issue, or does a successful safety program offer significant advantage to the company and the client? This article concludes that in the case of a high-risk industry, such as the construction industry, an organization with a successful safety program can promote safety performance as a sustainable competitive advantage. It is a choice the company can make.

  12. Advanced spacecraft fire safety: Proposed projects and program plan

    NASA Technical Reports Server (NTRS)

    Youngblood, Wallace W.; Vedha-Nayagam, M.

    1989-01-01

    A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

  13. Automatic intersection map generation task 10 report.

    DOT National Transportation Integrated Search

    2016-02-29

    This report describes the work conducted in Task 10 of the V2I Safety Applications Development Project. The work was performed by the University of Michigan Transportation Research Institute (UMTRI) under contract to the Crash Avoidance Metrics Partn...

  14. Creation of the Naturalistic Engagement in Secondary Tasks (NEST) distracted driving dataset.

    PubMed

    Owens, Justin M; Angell, Linda; Hankey, Jonathan M; Foley, James; Ebe, Kazutoshi

    2015-09-01

    Distracted driving has become a topic of critical importance to driving safety research over the past several decades. Naturalistic driving data offer a unique opportunity to study how drivers engage with secondary tasks in real-world driving; however, the complexities involved with identifying and coding relevant epochs of naturalistic data have limited its accessibility to the general research community. This project was developed to help address this problem by creating an accessible dataset of driver behavior and situational factors observed during distraction-related safety-critical events and baseline driving epochs, using the Strategic Highway Research Program 2 (SHRP2) naturalistic dataset. The new NEST (Naturalistic Engagement in Secondary Tasks) dataset was created using crashes and near-crashes from the SHRP2 dataset that were identified as including secondary task engagement as a potential contributing factor. Data coding included frame-by-frame video analysis of secondary task and hands-on-wheel activity, as well as summary event information. In addition, information about each secondary task engagement within the trip prior to the crash/near-crash was coded at a higher level. Data were also coded for four baseline epochs and trips per safety-critical event. 1,180 events and baseline epochs were coded, and a dataset was constructed. The project team is currently working to determine the most useful way to allow broad public access to the dataset. We anticipate that the NEST dataset will be extraordinarily useful in allowing qualified researchers access to timely, real-world data concerning how drivers interact with secondary tasks during safety-critical events and baseline driving. The coded dataset developed for this project will allow future researchers to have access to detailed data on driver secondary task engagement in the real world. It will be useful for standalone research, as well as for integration with additional SHRP2 data to enable the

  15. SHC Project 3.63, Task 2, Beneficial Use of Waste Materials

    EPA Science Inventory

    SHC Project 3.63, Task 2, “Beneficial Use of Waste Materials”, is designed to conduct research and analyses to characterize and quantify the risks and benefits of using or reusing waste materials. There are 6 primary research areas in Task 2 that cover a broad spectr...

  16. School Safety Project: Product Evaluation, 1990-1991.

    ERIC Educational Resources Information Center

    Saginaw Public Schools, MI. Dept. of Evaluation Services.

    A districtwide school safety project implemented in Saginaw, Michigan, in 1990-91, the third year of its operation, is evaluated in this report. The project is evaluated on the basis of the following objectives: employment and training of home-school liaison officers; establishment of an advisory council; development and implementation of…

  17. Safety equipment list for the 241-SY-101 RAPID mitigation project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MORRIS, K.L.

    1999-06-29

    This document provides the safety classification for the safety (safety class and safety RAPID Mitigation Project. This document is being issued as the project SEL until the supporting authorization basis documentation, this document will be superseded by the TWRS SEL (LMHC 1999), documentation istlralized. Upon implementation of the authorization basis significant) structures, systems, and components (SSCS) associated with the 241-SY-1O1 which will be updated to include the information contained herein.

  18. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The purpose and functions of NASA technology applications temas (TAT) are described, with emphasis on the activities of the Urban and Construction and Safety Project. The transfer and implementation of technology is discussed in five activities. Topics include: flat conductor cable, NASA house and compendium, flood insurance studies, tornado studies, and the controller for stationary diesels.

  19. Waste isolation safety assessment program. Task 4. Third contractor information meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study ofmore » actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.« less

  20. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    PubMed

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  1. I-25 truck safety improvements project : local evaluation report

    DOT National Transportation Integrated Search

    2004-12-29

    The I-25 Truck Safety Improvements project (I-25 TSIP) is the result of a FY98 congressionally designated earmark to support improvements in transportation efficiency, promote safety, increase traffic flow, reduce emissions, improve traveler informat...

  2. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    NASA Technical Reports Server (NTRS)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  3. Automated Visual Cognitive Tasks for Recording Neural Activity Using a Floor Projection Maze

    PubMed Central

    Kent, Brendon W.; Yang, Fang-Chi; Burwell, Rebecca D.

    2014-01-01

    Neuropsychological tasks used in primates to investigate mechanisms of learning and memory are typically visually guided cognitive tasks. We have developed visual cognitive tasks for rats using the Floor Projection Maze1,2 that are optimized for visual abilities of rats permitting stronger comparisons of experimental findings with other species. In order to investigate neural correlates of learning and memory, we have integrated electrophysiological recordings into fully automated cognitive tasks on the Floor Projection Maze1,2. Behavioral software interfaced with an animal tracking system allows monitoring of the animal's behavior with precise control of image presentation and reward contingencies for better trained animals. Integration with an in vivo electrophysiological recording system enables examination of behavioral correlates of neural activity at selected epochs of a given cognitive task. We describe protocols for a model system that combines automated visual presentation of information to rodents and intracranial reward with electrophysiological approaches. Our model system offers a sophisticated set of tools as a framework for other cognitive tasks to better isolate and identify specific mechanisms contributing to particular cognitive processes. PMID:24638057

  4. A task force model for statewide change in nursing education: building quality and safety.

    PubMed

    Mundt, Mary H; Clark, Margherita Procaccini; Klemczak, Jeanette Wrona

    2013-01-01

    The purpose of this article was to describe a statewide planning process to transform nursing education in Michigan to improve quality and safety of patient care. A task force model was used to engage diverse partners in issue identification, consensus building, and recommendations. An example of a statewide intervention in nursing education and practice that was executed was the Michigan Quality and Safety in Nursing Education Institute, which was held using an integrated approach to academic-practice partners from all state regions. This paper describes the unique advantage of leadership by the Michigan Chief Nurse Executive, the existence of a nursing strategic plan, and a funding model. An overview of the Task Force on Nursing Education is presented with a focus on the model's 10 process steps and resulting seven recommendations. The Michigan Nurse Education Council was established to implement the recommendations that included quality and safety. Copyright © 2013 Elsevier Inc. All rights reserved.

  5. Adapting Cognitive Task Analysis to Investigate Clinical Decision Making and Medication Safety Incidents.

    PubMed

    Russ, Alissa L; Militello, Laura G; Glassman, Peter A; Arthur, Karen J; Zillich, Alan J; Weiner, Michael

    2017-05-03

    Cognitive task analysis (CTA) can yield valuable insights into healthcare professionals' cognition and inform system design to promote safe, quality care. Our objective was to adapt CTA-the critical decision method, specifically-to investigate patient safety incidents, overcome barriers to implementing this method, and facilitate more widespread use of cognitive task analysis in healthcare. We adapted CTA to facilitate recruitment of healthcare professionals and developed a data collection tool to capture incidents as they occurred. We also leveraged the electronic health record (EHR) to expand data capture and used EHR-stimulated recall to aid reconstruction of safety incidents. We investigated 3 categories of medication-related incidents: adverse drug reactions, drug-drug interactions, and drug-disease interactions. Healthcare professionals submitted incidents, and a subset of incidents was selected for CTA. We analyzed several outcomes to characterize incident capture and completed CTA interviews. We captured 101 incidents. Eighty incidents (79%) met eligibility criteria. We completed 60 CTA interviews, 20 for each incident category. Capturing incidents before interviews allowed us to shorten the interview duration and reduced reliance on healthcare professionals' recall. Incorporating the EHR into CTA enriched data collection. The adapted CTA technique was successful in capturing specific categories of safety incidents. Our approach may be especially useful for investigating safety incidents that healthcare professionals "fix and forget." Our innovations to CTA are expected to expand the application of this method in healthcare and inform a wide range of studies on clinical decision making and patient safety.

  6. The 2007 Projected Impacts to Clark County and Local Government Public Safety Agencies Resulting from the Transportation of High- Level Nuclear Waste to Yucca Mountain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mushkatel, A.H.; Conway, P.H.D.S.; Navis, I.

    2008-07-01

    This paper focuses on projecting fiscal impacts to public safety agencies from the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. The efforts made by Clark County Nevada, to develop a fiscal model of impacts for public safety agencies are described in this paper. In addition, the scenarios used in the study are discussed, as well as a discussion of the plume models provided for each community's scenario that result from the efforts of the National Atmospheric Release Advisory Center (NARAC). Some of the difficulties in constructing a fiscal model of impacts for the entire 24 year high-level nuclearmore » waste transportation shipping campaign are identified, and a refined methodology is provided to accomplish this task. Finally, a comparison of the fiscal impact projections for public safety agencies that Clark County developed in 2001, 2005 are discussed, and the fiscal impact cost projections for the entire 24 year transportation campaign are provided. (authors)« less

  7. 77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...

  8. A root cause analysis project in a medication safety course.

    PubMed

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  9. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    ERIC Educational Resources Information Center

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  10. V1 projection zone signals in human macular degeneration depend on task, not stimulus.

    PubMed

    Masuda, Yoichiro; Dumoulin, Serge O; Nakadomari, Satoshi; Wandell, Brian A

    2008-11-01

    We used functional magnetic resonance imaging to assess abnormal cortical signals in humans with juvenile macular degeneration (JMD). These signals have been interpreted as indicating large-scale cortical reorganization. Subjects viewed a stimulus passively or performed a task; the task was either related or unrelated to the stimulus. During passive viewing, or while performing tasks unrelated to the stimulus, there were large unresponsive V1 regions. These regions included the foveal projection zone, and we refer to them as the lesion projection zone (LPZ). In 3 JMD subjects, we observed highly significant responses in the LPZ while they performed stimulus-related judgments. In control subjects, where we presented the stimulus only within the peripheral visual field, there was no V1 response in the foveal projection zone in any condition. The difference between JMD and control responses can be explained by hypotheses that have very different implications for V1 reorganization. In controls retinal afferents carry signals indicating the presence of a uniform (zero-contrast) region of the visual field. Deletion of retinal input may 1) spur the formation of new cortical pathways that carry task-dependent signals (reorganization), or 2) unmask preexisting task-dependent cortical signals that ordinarily are suppressed by the deleted signals (no reorganization).

  11. V1 Projection Zone Signals in Human Macular Degeneration Depend on Task, not Stimulus

    PubMed Central

    Dumoulin, Serge O.; Nakadomari, Satoshi; Wandell, Brian A.

    2008-01-01

    We used functional magnetic resonance imaging to assess abnormal cortical signals in humans with juvenile macular degeneration (JMD). These signals have been interpreted as indicating large-scale cortical reorganization. Subjects viewed a stimulus passively or performed a task; the task was either related or unrelated to the stimulus. During passive viewing, or while performing tasks unrelated to the stimulus, there were large unresponsive V1 regions. These regions included the foveal projection zone, and we refer to them as the lesion projection zone (LPZ). In 3 JMD subjects, we observed highly significant responses in the LPZ while they performed stimulus-related judgments. In control subjects, where we presented the stimulus only within the peripheral visual field, there was no V1 response in the foveal projection zone in any condition. The difference between JMD and control responses can be explained by hypotheses that have very different implications for V1 reorganization. In controls retinal afferents carry signals indicating the presence of a uniform (zero-contrast) region of the visual field. Deletion of retinal input may 1) spur the formation of new cortical pathways that carry task-dependent signals (reorganization), or 2) unmask preexisting task-dependent cortical signals that ordinarily are suppressed by the deleted signals (no reorganization). PMID:18250083

  12. Safety and Health Instructional Materials for Vocational Education--A State of the Art Report.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lube, Bruce M.

    This report details Task D (of a seventeen-task project), which identified safety and health concepts, knowledge, and skills included in print and non-print materials designed to develop performance outcomes needed by employers and employees. (The project intends to develop performance-based modularized instructional materials for teaching job…

  13. Reaping the Benefits of Task Conflict in Teams: The Critical Role of Team Psychological Safety Climate

    ERIC Educational Resources Information Center

    Bradley, Bret H.; Postlethwaite, Bennett E.; Klotz, Anthony C.; Hamdani, Maria R.; Brown, Kenneth G.

    2012-01-01

    Past research suggests that task conflict may improve team performance under certain conditions; however, we know little about these specific conditions. On the basis of prior theory and research on conflict in teams, we argue that a climate of psychological safety is one specific context under which task conflict will improve team performance.…

  14. Silicon material task - Low cost solar array project /JPL/DOE/

    NASA Technical Reports Server (NTRS)

    Lutwack, R.

    1979-01-01

    The paper describes the silicon material task of the low-cost solar array project, which has the objective of establishing a silicon production capability equivalent to 500 mW per year at a price less than 10 dollars/kg (1975 dollars) in 1986. The task program is divided into four phases: technical feasibility, scale-up studies (the present phase), experimental process system development units, and implementation of large-scale production plants, and it involves the development of processes for two groups of materials, that is, semiconductor grade and solar cell grade. In addition, the effects of impurities on solar cell performance are being investigated. Attention is given to problem areas of the task program, such as environmental protection, material compatibility between the reacting chemicals and materials of construction of the equipment, and waste disposal.

  15. Compendium of traffic safety research projects : 1987-1997

    DOT National Transportation Integrated Search

    1997-09-01

    The National Highway Traffic Safety Administration's (NHTSA) Research and Evaluation Division, Office of Research and Traffic Records, conducts research and evaluation projects dealing with human attitudes, behaviors, and failures (motor vehicle cras...

  16. SHC Project 3.63, Task 2, Beneficial Use of Waste Materials ...

    EPA Pesticide Factsheets

    SHC Project 3.63, Task 2, “Beneficial Use of Waste Materials”, is designed to conduct research and analyses to characterize and quantify the risks and benefits of using or reusing waste materials. There are 6 primary research areas in Task 2 that cover a broad spectrum of topics germane to the beneficial use of waste materials and address Agency, Office, Region and other client needs. The 6 research areas include: 1) Materials Recovery Technology, 2) Beneficial Use of Materials Optimization, 3) Novel Products from Waste Materials, 4) Land Application of Biosolids, 5) Soil Remediation Amendments and 6) Improved Leaching Methods for More Accurate Prediction of Environmental Release of Metals. The objectives of each research area, their intended products and progress to date will be presented. The products of this Task will enable communities and the Agency to better protect and enhance human health, well-being and the environment for current and future generations, through the reduction in material consumption, reuse, and recycling of materials. This presentation is designed to convey the rational, purpose and planned research in EPAs Safe and Healthy Communities (SHC) National Research Program Project 3.63 (Sustainable Materials Management) Task 2, “Beneficial Use of Waste Materials”, which is designed to conduct research and analyses to characterize and quantify the risks and benefits of using or reusing waste materials. . This presentation has bee

  17. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    PubMed

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  18. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    NASA Technical Reports Server (NTRS)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  19. Systems thinking applied to safety during manual handling tasks in the transport and storage industry.

    PubMed

    Goode, Natassia; Salmon, Paul M; Lenné, Michael G; Hillard, Peter

    2014-07-01

    Injuries resulting from manual handling tasks represent an on-going problem for the transport and storage industry. This article describes an application of a systems theory-based approach, Rasmussen's (1997. Safety Science 27, 183), risk management framework, to the analysis of the factors influencing safety during manual handling activities in a freight handling organisation. Observations of manual handling activities, cognitive decision method interviews with workers (n=27) and interviews with managers (n=35) were used to gather information about three manual handling activities. Hierarchical task analysis and thematic analysis were used to identify potential risk factors and performance shaping factors across the levels of Rasmussen's framework. These different data sources were then integrated using Rasmussen's Accimap technique to provide an overall analysis of the factors influencing safety during manual handling activities in this context. The findings demonstrate how a systems theory-based approach can be applied to this domain, and suggest that policy-orientated, rather than worker-orientated, changes are required to prevent future manual handling injuries. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. 75 FR 5511 - Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ...-AA00 Safety Zone; AICW Closure Safety Zone for Ben Sawyer Bridge Replacement Project, Sullivan's Island... replacement of the old and new approach spans of the Ben Sawyer Swing Bridge. This regulation is necessary to... proposed rulemaking (NPRM) with respect to this rule because hazards associated with the bridge replacement...

  1. The future of hazardous chemical safety in China: Opportunities, problems, challenges and tasks.

    PubMed

    Wang, Bing; Wu, Chao; Reniers, Genserik; Huang, Lang; Kang, Liangguo; Zhang, Laobing

    2018-06-20

    China is a major country producing and using hazardous chemicals. Unfortunately, the hazardous chemical industry is still one of the most high-risk industries in China. In recent years, especially after two devastating hazardous chemical accidents, namely "Qingdao 11.2 Crude Oil Leaking and Explosion Accident" and "Tianjin Port 8.12 Fire and Explosion Accident" which occurred in 2013 and 2015 respectively, China has attached great importance to hazardous chemical safety. The period between 2016 and 2017 is a crucial period for the future direction of hazardous chemical safety in China because China released a series of important government documents (such as 'Thirteenth Five-Year (2016-2020) Plan for Hazardous Chemical Safety' and 'Comprehensive Plan for Hazardous Chemical Safety Management (December 2016-November 2019)') to promote hazardous chemical safety in the future. What is the future development of China's hazardous chemical safety? To answer this question, this paper attempts to briefly analyze and introduce the opportunities, problems, challenges and tasks of the future of safety with hazardous chemical industrial activities in China, according to the current situation of hazardous chemical safety in China and using the latest government documents and studies. Obviously, this study can provide useful evidence and suggestions for the future of safety management in the hazardous chemical industry both within China and in other countries. Copyright © 2018 Elsevier B.V. All rights reserved.

  2. Reflecting on the Japan-Chile Task-Based Telecollaboration Project for Beginner-Level Learners

    ERIC Educational Resources Information Center

    Dunne, B. Greg

    2014-01-01

    Using O'Dowd and Ritter's (2006) Inventory of Reasons for Failed Communication in Telecollaborative Projects as a barometer, this article details the considerations and procedures followed in a task-based, asynchronous email telecollaboration project between EFL (English as a Foreign Language) learners in Japan and Chile. In a climate where…

  3. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  4. Development and Validation of Career Development Guidelines by Task/Activity Analysis of Occupational Safety and Health Professions: Industrial Hygiene and Safety Professional. Final Report. Technical Report XII.

    ERIC Educational Resources Information Center

    Vernon, Ralph J.; And Others

    This report summarizes research findings which resulted in development of curricula for occupational safety and health professions based on task/activity analyses and related performance objectives. The first seven chapters focus on the seven objectives. Chapter 1, Literature Review and Selection of Employers, concerns tasks required for…

  5. Clinical Trial Electronic Portals for Expedited Safety Reporting: Recommendations from the Clinical Trials Transformation Initiative Investigational New Drug Safety Advancement Project.

    PubMed

    Perez, Raymond P; Finnigan, Shanda; Patel, Krupa; Whitney, Shanell; Forrest, Annemarie

    2016-12-15

    Use of electronic clinical trial portals has increased in recent years to assist with sponsor-investigator communication, safety reporting, and clinical trial management. Electronic portals can help reduce time and costs associated with processing paperwork and add security measures; however, there is a lack of information on clinical trial investigative staff's perceived challenges and benefits of using portals. The Clinical Trials Transformation Initiative (CTTI) sought to (1) identify challenges to investigator receipt and management of investigational new drug (IND) safety reports at oncologic investigative sites and coordinating centers and (2) facilitate adoption of best practices for communicating and managing IND safety reports using electronic portals. CTTI, a public-private partnership to improve the conduct of clinical trials, distributed surveys and conducted interviews in an opinion-gathering effort to record investigator and research staff views on electronic portals in the context of the new safety reporting requirements described in the US Food and Drug Administration's final rule (Code of Federal Regulations Title 21 Section 312). The project focused on receipt, management, and review of safety reports as opposed to the reporting of adverse events. The top challenge investigators and staff identified in using individual sponsor portals was remembering several complex individual passwords to access each site. Also, certain tasks are time-consuming (eg, downloading reports) due to slow sites or difficulties associated with particular operating systems or software. To improve user experiences, respondents suggested that portals function independently of browsers and operating systems, have intuitive interfaces with easy navigation, and incorporate additional features that would allow users to filter, search, and batch safety reports. Results indicate that an ideal system for sharing expedited IND safety information is through a central portal used by

  6. 77 FR 27814 - Model Safety Evaluation for Plant-Specific Adoption of Technical Specifications Task Force...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... NUCLEAR REGULATORY COMMISSION [Project No. 753; NRC-2012-0019] Model Safety Evaluation for Plant... Regulatory Commission (NRC) is announcing the availability of the model safety evaluation (SE) for plant... the Improved Standard Technical Specification (ISTS), NUREG-1431, ``Standard Technical Specifications...

  7. Data collection and analysis for local roadway safety assessment.

    DOT National Transportation Integrated Search

    2014-11-01

    The project Data Analysis for Local Roadway : Assessment conducted systematic road-safety : assessment and identified major risks that can be el : iminated or reduced by pr : actical road-improvement : measures. Specifically, the primary task o...

  8. Good practices : incorporating safety into resurfacing and restoration projects

    DOT National Transportation Integrated Search

    2006-12-01

    Integrating safety improvements into resurfacing and restoration projects is a subject of long-standing interest by Federal, State, and local transportation agencies. A Scan Tour was conducted to identify and subsequently observe good practices in th...

  9. Innovative tools and techniques in identifying highway safety improvement projects : technical report.

    DOT National Transportation Integrated Search

    2017-08-01

    The Highway Safety Improvement Program (HSIP) aims to achieve a reduction in the number and severity of fatalities and serious injury crashes on all public roads by implementing highway safety improvement projects. Although the structure and main com...

  10. 9-1529 : low-cost safety solutions, pavement preservation, and maintenance practices for rural highways.

    DOT National Transportation Integrated Search

    2014-08-01

    Task 1 : The objective of this project was to develop and : demonstrate innovative low-cost solutions to : improve safety at stop-controlled intersections. : Preliminary directives from the project panel : were to focus on treatments on the minor str...

  11. 75 FR 59078 - Safety Zone; Ledge Removal Project, Bass Harbor, ME

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2010-0806] RIN 1625-AA00 Safety Zone; Ledge Removal Project, Bass Harbor, ME AGENCY: Coast Guard, DHS. ACTION: Temporary... District USACE Web site: http://www.nae.usace.army.mil/projects/me/bassharbor/bassharbor.htm . No...

  12. The SISIFO project: Seismic Safety at High Schools

    NASA Astrophysics Data System (ADS)

    Peruzza, Laura; Barnaba, Carla; Bragato, Pier Luigi; Dusi, Alberto; Grimaz, Stefano; Malisan, Petra; Saraò, Angela; Mucciarelli, Marco

    2014-05-01

    For many years, the Italian scientific community has faced the problem of the reduction of earthquake risk using innovative educational techniques. Recent earthquakes in Italy and around the world have clearly demonstrated that seismic codes alone are not able to guarantee an effective mitigation of risk. After the tragic events of San Giuliano di Puglia (2002), where an earthquake killed 26 school children, special attention was paid in Italy to the seismic safety of schools, but mainly with respect to structural aspects. Little attention has been devoted to the possible and even significant damage to non-structural elements (collapse of ceilings, tipping of cabinets and shelving, obstruction of escape routes, etc..). Students and teachers trained on these aspects may lead to a very effective preventive vigilance. Since 2002, the project EDURISK (www.edurisk.it) proposed educational tools and training programs for schools, at primary and middle levels. More recently, a nationwide campaign aimed to adults (www.iononrischio.it) was launched with the extensive support of civil protection volounteers. There was a gap for high schools, and Project SISIFO was designed to fill this void and in particular for those schools with technical/scientific curricula. SISIFO (https://sites.google.com/site/ogssisifo/) is a multidisciplinary initiative, aimed at the diffusion of scientific culture for achieving seismic safety in schools, replicable and can be structured in training the next several years. The students, helped by their teachers and by experts from scientific institutions, followed a course on specialized training on earthquake safety. The trial began in North-East Italy, with a combination of hands-on activities for the measurement of earthquakes with low-cost instruments and lectures with experts in various disciplines, accompanied by specifically designed teaching materials, both on paper and digital format. We intend to raise teachers and students knowledge of the

  13. Patterns of patient safety culture: a complexity and arts-informed project of knowledge translation.

    PubMed

    Mitchell, Gail J; Tregunno, Deborah; Gray, Julia; Ginsberg, Liane

    2011-01-01

    The purpose of this paper is to describe patterns of patient safety culture that emerged from an innovative collaboration among health services researchers and fine arts colleagues. The group engaged in an arts-informed knowledge translation project to produce a dramatic expression of patient safety culture research for inclusion in a symposium. Scholars have called for a deeper understanding of the complex interrelationships among structure, process and outcomes relating to patient safety. Four patterns of patient safety culture--blinding familiarity, unyielding determination, illusion of control and dismissive urgency--are described with respect to how they informed creation of an arts-informed project for knowledge translation.

  14. Working together to ensure safety at hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartel, J.W.

    Providing for public safety around a hydroelectric facility can be critically important to the welfare of a hydro-power producer. With this in mind, Wisconsin Electric Power Company and Wisconsin Public Service Corporation have worked together to develop consistent safety signage and several for their hydro projects. Although the two utilities sometimes compete for electric customers, they cooperate to ensure the safety to those customers. Both WE and WPS took steps in 1986 to make their operations safer through involvement in the Wisconsin/Michigan Hydro User Group. The organization has 25 members-primarily of electric utilities and paper companies-who operate hydro facilities inmore » the two states. The two areas that the HUG studied in public safety were signs and warning systems. HUG established a sign committee to study how to increase safety of people around hydro plants through signs, explained Ted Handrick, hydro plant superintendent at WPS. The committee's recommendations led to development of a statewide uniform sign system adopted by all HUG members. The committee used Wisconsin Department of Natural Resources' guidelines for warning signs and portages in developing the signage standards. HUG members are converting to these new sign standards as they replace old signs and/or install new signs. Notices describing the new signage system have been placed near each hydro plant, at boat landings, and in campgrounds. The signs are mounted well above ground level so they can be seen and easily read by recreationalists. Warning systems, in accordance with HUG warning standards, were installed at WE and WPS hydro facilities. These systems alert nearby recreational users of rapid increases in water flow when generating units are turned on or when spillway gates are opened. Soon after the authors installed equipment to remotely operate its hydro facilities, the utility experienced a dramatic increase increase in intrusion on dams and other structures at the

  15. Compendium of Traffic Safety Research Projects: 1985-1995 and Beyond

    DOT National Transportation Integrated Search

    1996-03-01

    The National Highway Traffic Safety Administration's Office of Program : Development and Evaluation (OPDE) conducts research and evaluation projects : dealing with human attitudes, behaviors and failures (motor vehicle crashes). : OPDE's focus is on ...

  16. The Influence of Individual and Team Cognitive Ability on Operators’ Task and Safety Performance: A Multilevel Field Study in Nuclear Power Plants

    PubMed Central

    Zhang, Jingyu; Li, Yongjuan; Wu, Changxu

    2013-01-01

    While much research has investigated the predictors of operators’ performance such as personality, attitudes and motivation in high-risk industries, its cognitive antecedents and boundary conditions have not been fully investigated. Based on a multilevel investigation of 312 nuclear power plant main control room operators from 50 shift teams, the present study investigated how general mental ability (GMA) at both individual and team level can influence task and safety performance. At the individual level, operators’ GMA was predictive of their task and safety performance and this trend became more significant as they accumulated more experience. At the team level, we found team GMA had positive influences on all three performance criteria. However, we also found a “big-fish-little-pond” effect insofar as team GMA had a relatively smaller effect and inhibited the contribution of individual GMA to workers’ extra-role behaviors (safety participation) compared to its clear beneficial influence on in-role behaviors (task performance and safety compliance). The possible mechanisms related to learning and social comparison processes are discussed. PMID:24391964

  17. Programmatic Agreements for Project-Level Air Quality Analyses : NCHRP 25-25 Task 78

    DOT National Transportation Integrated Search

    2015-09-01

    The research performed under Task 78 was divided into two phases. The first phase involved development of a draft Programmatic Agreement (PA) template and a draft Technical Support Document (TSD) template for project-level carbon monoxide (CO) hot-sp...

  18. Railroad safety program, task 2

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Aspects of railroad safety and the preparation of a National Inspection Plan (NIP) for rail safety improvement are examined. Methodology for the allocation of inspection resources, preparation of a NIP instruction manual, and recommendations for future NIP, are described. A statistical analysis of regional rail accidents is presented with causes and suggested preventive measures included.

  19. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  20. Framework for selection and evaluation of bicycle and pedestrian safety projects in Virginia.

    DOT National Transportation Integrated Search

    2008-01-01

    The Virginia Department of Transportation's (VDOT) Bicycle and Pedestrian Safety (BPS) Program provides funds for implementing short-term, low-cost bicycle and pedestrian safety projects in Virginia. This initiative is administered by evaluating each...

  1. An analysis of problem drinker diagnosis and referral within the Fairfax Alcohol Safety Action Project, 1972.

    DOT National Transportation Integrated Search

    1974-01-01

    This report is one of a series developed in conformance with annual reporting requirements contained within Alcohol Safety Action Projects: Evaluation. In February 1972, operations of the Fairfax Alcohol Safety Action Project began and these federall...

  2. System Safety in Early Manned Space Program: A Case Study of NASA and Project Mercury

    NASA Technical Reports Server (NTRS)

    Hansen, Frederick D.; Pitts, Donald

    2005-01-01

    This case study provides a review of National Aeronautics and Space Administration s (NASA's) involvement in system safety during research and evolution from air breathing to exo-atmospheric capable flight systems culminating in the successful Project Mercury. Although NASA has been philosophically committed to the principals of system safety, this case study points out that budget and manpower constraints-as well as a variety of internal and external pressures can jeopardize even a well-designed system safety program. This study begins with a review of the evolution and early years of NASA's rise as a project lead agency and ends with the lessons learned from Project Mercury.

  3. 77 FR 50916 - Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0767] RIN 1625-AA00 Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA AGENCY: Coast.... 165.T01-0767 Safety Zone; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA. (a...

  4. Projecting effects of improvements in passive safety of the New Zealand light vehicle fleet.

    PubMed

    Keall, Michael; Newstead, Stuart; Jones, Wayne

    2007-09-01

    In the year 2000, as part of the process for setting New Zealand road safety targets, a projection was made for a reduction in social cost of 15.5 percent associated with improvements in crashworthiness, which is a measure of the occupant protection of the light passenger vehicle fleet. Since that document was produced, new estimates of crashworthiness have become available, allowing for a more accurate projection. The objective of this paper is to describe a methodology for projecting changes in casualty rates associated with passive safety features and to apply this methodology to produce a new prediction. The shape of the age distribution of the New Zealand light passenger vehicle fleet was projected to 2010. Projected improvements in crashworthiness and associated reductions in social cost were also modeled based on historical trends. These projections of changes in the vehicle fleet age distribution and of improvements in crashworthiness together provided a basis for estimating the future performance of the fleet in terms of secondary safety. A large social cost reduction of about 22 percent for 2010 compared to the year 2000 was predicted due to the expected huge impact of improvements in passive vehicle features on road trauma in New Zealand. Countries experiencing improvements in their vehicle fleets can also expect significant reductions in road injury compared to a less crashworthy passenger fleet. Such road safety gains can be analyzed using some of the methodology described here.

  5. Managing uncertainty in collaborative robotics engineering projects: The influence of task structure and peer interaction

    NASA Astrophysics Data System (ADS)

    Jordan, Michelle

    Uncertainty is ubiquitous in life, and learning is an activity particularly likely to be fraught with uncertainty. Previous research suggests that students and teachers struggle in their attempts to manage the psychological experience of uncertainty and that students often fail to experience uncertainty when uncertainty may be warranted. Yet, few educational researchers have explicitly and systematically observed what students do, their behaviors and strategies, as they attempt to manage the uncertainty they experience during academic tasks. In this study I investigated how students in one fifth grade class managed uncertainty they experienced while engaged in collaborative robotics engineering projects, focusing particularly on how uncertainty management was influenced by task structure and students' interactions with their peer collaborators. The study was initiated at the beginning of instruction related to robotics engineering and preceded through the completion of several long-term collaborative robotics projects, one of which was a design project. I relied primarily on naturalistic observation of group sessions, semi-structured interviews, and collection of artifacts. My data analysis was inductive and interpretive, using qualitative discourse analysis techniques and methods of grounded theory. Three theoretical frameworks influenced the conception and design of this study: community of practice, distributed cognition, and complex adaptive systems theory. Uncertainty was a pervasive experience for the students collaborating in this instructional context. Students experienced uncertainty related to the project activity and uncertainty related to the social system as they collaborated to fulfill the requirements of their robotics engineering projects. They managed their uncertainty through a diverse set of tactics for reducing, ignoring, maintaining, and increasing uncertainty. Students experienced uncertainty from more different sources and used more and

  6. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...

  7. 77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...

  8. Investigating Antecedents of Task Commitment and Task Attraction in Service Learning Team Projects

    ERIC Educational Resources Information Center

    Schaffer, Bryan S.; Manegold, Jennifer G.

    2018-01-01

    The authors investigated the antecedents of team task cohesiveness in service learning classroom environments. Focusing on task commitment and task attraction as key dependent variables representing cohesiveness, and task interdependence as the primary independent variable, the authors position three important task action phase processes as…

  9. Bridging the Divide between Safety and Risk Management for your Project or Program

    NASA Technical Reports Server (NTRS)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  10. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  11. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  12. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  13. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  14. 25 CFR 170.142 - How can tribes obtain funds to perform highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can tribes obtain funds to perform highway safety... WATER INDIAN RESERVATION ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Highway Safety Functions § 170.142 How can tribes obtain funds to perform highway safety projects? There are two...

  15. Accidents That Shouldn't Happen: A Report of the Grade Crossing Safety Task Force to Secretary Federico Pena

    DOT National Transportation Integrated Search

    1996-03-01

    This report explains how a lack of information and/or guidelines in the design, construction, operation, maintenance, and inspection of grade crossings led the Task Force to identify five safety problem areas for detailed examination-interconnected S...

  16. 76 FR 63988 - Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ...-0097] Pilot Project on NAFTA Trucking Provisions; Pre-Authorization Safety Audits AGENCY: Federal Motor... public comment on data and information concerning the Pre-Authorization Safety Audits (PASAs) for two motor carriers that applied to participate in the Agency's long-haul pilot program to test and...

  17. Autonomy, competence, and social relatedness in task interest within project-based education.

    PubMed

    Minnaert, Alexander; Boekaerts, Monique; de Brabander, Cornelis

    2007-10-01

    To prepare students for instructive collaboration, it is necessary to have insight into students' psychological needs and interest development. The framework of self-determination theory was used to conduct a field experiment involving 114 students in vocational education. These students followed a practical business course which required they work in small learning groups. During the course, students were asked to complete the Quality of Working in Groups Instrument, an online measure of how strong autonomy, competence, social relatedness, and task interest are fulfilled. SEM showed that students' psychological needs were jointly and uniquely related to task interest over time. The significance of this on-line test for the assessment of interest within project-based education is discussed.

  18. Assessing Explosives Safety Risks, Deviations, And Consequences

    DTIC Science & Technology

    2009-07-31

    Technical Paper 23 31 July 2009 DDESB Assessing Explosives Safety Risks, Deviations, And Consequences ...Deviations, And Consequences 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...and approaches to assist warfighters in executing their mission, conserving resources, and maximizing operational effectiveness . When mission risk

  19. The Environmental Health/Home Safety Education Project: a successful and practical U.S.-Mexico border initiative.

    PubMed

    Forster-Cox, Susan C; Mangadu, Thenral; Jacquez, Benjamín; Fullerton, Lynne

    2010-05-01

    The Environmental Health/Home Safety Education Project (Proyecto de Salud Ambiental y Seguridad en el Hogar) has been developed in response to a wide array of severe and often preventable environmental health issues occurring in and around homes on the U.S.-Mexico border. Utilizing well-trained community members, called promotoras , homes are visited and assessed for potential environmental hazards, including home fire and food safety issues. Data analyzed from project years 2002 to 2005 shows a significant impact in knowledge levels and initial behavior change among targeted participants as it relates to fire and food safety issues. Since the initiation of the project in 1999, hundreds of participants have improved their quality of life by making their homes safer. The project has proven to be sustainable, replicable, flexible, and attractive to funders.

  20. NASA Engineering Safety Center NASA Aerospace Flight Battery Systems Working Group 2007 Proactive Task Status

    NASA Technical Reports Server (NTRS)

    Manzo, Michelle A.

    2007-01-01

    In 2007, the NASA Engineering Safety Center (NESC) chartered the NASA Aerospace Flight Battery Systems Working Group to bring forth and address critical battery-related performance/manufacturing issues for NASA and the aerospace community. A suite of tasks identifying and addressing issues related to Ni-H2 and Li-ion battery chemistries was submitted and selected for implementation. The current NESC funded are: (1) Wet Life of Ni-H2 Batteries (2) Binding Procurement (3) NASA Lithium-Ion Battery Guidelines (3a) Li-Ion Performance Assessment (3b) Li-Ion Guidelines Document (3b-i) Assessment of Applicability of Pouch Cells for Aerospace Missions (3b-ii) High Voltage Risk Assessment (3b-iii) Safe Charge Rates for Li-Ion Cells (4) Availability of Source Material for Li-Ion Cells (5) NASA Aerospace Battery Workshop This presentation provides a brief overview of the tasks in the 2007 plan and serves as an introduction to more detailed discussions on each of the specific tasks.

  1. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    PubMed

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  2. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    NASA Astrophysics Data System (ADS)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  3. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume III. Project environmental/health/safety/ and socioeconomic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less

  4. 76 FR 25278 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... safety zone during the construction of the TriMet Bridge on the Willamette River, in Portland, OR. This..., will be starting construction of the new Portland-Milwaukie Light Rail Bridge on July 1, 2011 (with in...

  5. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators andmore » training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.« less

  6. The European ASAMPSA_E project : towards guidance to model the impact of high amplitude natural hazards in the probabilistic safety assessment of nuclear power plants. Information on the project progress and needs from the geosciences.

    NASA Astrophysics Data System (ADS)

    Raimond, Emmanuel; Decker, Kurt; Guigueno, Yves; Klug, Joakim; Loeffler, Horst

    2015-04-01

    The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences, in particular flooding, went beyond what was considered in the initial engineering design design of nuclear power plants (NPPs). Such situations can in theory be identified using probabilistic safety assessment (PSA) methodology. PSA results may then lead industry (system suppliers and utilities) or Safety Authorities to take appropriate decisions to reinforce the defence-in-depth of the NPP for low probability event but high amplitude consequences. In reality, the development of such PSA remains a challenging task. Definitions of the design basis of NPPs, for example, require data on events with occurrence probabilities not higher than 10-4 per year. Today, even lower probabilities, down to 10-8, are expected and typically used for probabilistic safety analyses (PSA) of NPPs and the examination of so-called design extension conditions. Modelling the combinations of natural or man-made hazards that can affect a NPP and affecting some meaningful probability of occurrence seems to be difficult. The European project ASAMPSAE (www.asampsa.eu) gathers more than 30 organizations (industry, research, safety control) from Europe, US and Japan and aims at identifying some meaningful practices to extend the scope and the quality of the existing probabilistic safety analysis developed for nuclear power plants. It offers a framework to discuss, at a technical level, how "extended PSA" can be developed efficiently and be used to verify if the robustness of Nuclear Power Plants (NPPs) in their environment is sufficient. The paper will present the objectives of this project, some first lessons and introduce which type of guidance is being developed. It will explain the need of expertise from geosciences to support the nuclear safety assessment in the different area (seismotectonic, hydrological, meteorological and biological

  7. 77 FR 63732 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... vessels from the hazards associated with the demolition project on the Cline Avenue bridge, which are...

  8. 77 FR 72957 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... associated with the demolition project on the Cline Avenue bridge, which are discussed further below. Under 5...

  9. West Virginia peer exchange : streamlining highway safety improvement program project delivery.

    DOT National Transportation Integrated Search

    2015-01-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences : for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September : 22 to 23, 2014 in Charleston, We...

  10. 76 FR 78157 - Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ...-AA00 Safety Zone; Eisenhower Expressway Bridge Rehabilitation Project; Chicago River South Branch... the Eisenhower Expressway Bridge. This temporary safety zone is necessary to protect the surrounding... Bridge. Entry into this zone is prohibited unless specifically authorized by the Captain of the Port...

  11. Study of Evaluation OSH Management System Policy Based On Safety Culture Dimensions in Construction Project

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko

    2017-07-01

    Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.

  12. Extending Occupational Health and Safety to Urban Street Vendors: Reflections From a Project in Durban, South Africa.

    PubMed

    Alfers, Laura; Xulu, Phumzile; Dobson, Richard; Hariparsad, Sujatha

    2016-08-01

    This article focuses on an action-research project which is attempting to extend occupational health and safety to a group of street traders in Durban, South Africa, using a variety of different (and sometimes unconventional) institutional actors. The article is written from the perspective of key people who have played a role in conceptualizing and administering the project and is intended to deepen the conversation about what it means to extend occupational health to the informal economy. It explores this question through a reflection on three key project activities: the setting up of a trader-led health and safety committee, an occupational health and safety training course, and a clinical health assessment. It concludes with a discussion of the issues that emerge from the reflections of project participants, which include the need to bring occupational health and urban health into closer conversation with one another, the need to be cognizant of local "informal" politics and the impact that has on occupational health and safety interventions, and the need to create greater opportunities for occupational health and safety professionals to interact with workers in the informal economy. © The Author(s) 2016.

  13. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH),more » Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.« less

  14. Care for a Patient With Cancer As a Project: Management of Complex Task Interdependence in Cancer Care Delivery.

    PubMed

    Trosman, Julia R; Carlos, Ruth C; Simon, Melissa A; Madden, Debra L; Gradishar, William J; Benson, Al B; Rapkin, Bruce D; Weiss, Elisa S; Gareen, Ilana F; Wagner, Lynne I; Khan, Seema A; Bunce, Mikele M; Small, Art; Weldon, Christine B

    2016-11-01

    Cancer care is highly complex and suffers from fragmentation and lack of coordination across provider specialties and clinical domains. As a result, patients often find that they must coordinate care on their own. Coordinated delivery teams may address these challenges and improve quality of cancer care. Task interdependence is a core principle of rigorous teamwork and is essential to addressing the complexity of cancer care, which is highly interdependent across specialties and modalities. We examined challenges faced by a patient with early-stage breast cancer that resulted from difficulties in understanding and managing task interdependence across clinical domains involved in this patient's care. We used team science supported by the project management discipline to discuss how various task interdependence aspects can be recognized, deliberately designed, and systematically managed to prevent care breakdowns. This case highlights how effective task interdependence management facilitated by project management methods could markedly improve the course of a patient's care. This work informs efforts of cancer centers and practices to redesign cancer care delivery through innovative, practical, and patient-centered approaches to management of task interdependence in cancer care. Future patient-reported outcomes research will help to determine optimal ways to engage patients, including those who are medically underserved, in managing task interdependence in their own care.

  15. Care for a Patient With Cancer As a Project: Management of Complex Task Interdependence in Cancer Care Delivery

    PubMed Central

    Carlos, Ruth C.; Simon, Melissa A.; Madden, Debra L.; Gradishar, William J.; Benson, Al B.; Rapkin, Bruce D.; Weiss, Elisa S.; Gareen, Ilana F.; Wagner, Lynne I.; Khan, Seema A.; Bunce, Mikele M.; Small, Art; Weldon, Christine B.

    2016-01-01

    Cancer care is highly complex and suffers from fragmentation and lack of coordination across provider specialties and clinical domains. As a result, patients often find that they must coordinate care on their own. Coordinated delivery teams may address these challenges and improve quality of cancer care. Task interdependence is a core principle of rigorous teamwork and is essential to addressing the complexity of cancer care, which is highly interdependent across specialties and modalities. We examined challenges faced by a patient with early-stage breast cancer that resulted from difficulties in understanding and managing task interdependence across clinical domains involved in this patient’s care. We used team science supported by the project management discipline to discuss how various task interdependence aspects can be recognized, deliberately designed, and systematically managed to prevent care breakdowns. This case highlights how effective task interdependence management facilitated by project management methods could markedly improve the course of a patient’s care. This work informs efforts of cancer centers and practices to redesign cancer care delivery through innovative, practical, and patient-centered approaches to management of task interdependence in cancer care. Future patient-reported outcomes research will help to determine optimal ways to engage patients, including those who are medically underserved, in managing task interdependence in their own care. PMID:27577619

  16. 77 FR 64718 - Safety Zone; Steam Ship Col. James M. Schoonmaker Relocation Project, Maumee River, Toledo, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0939] RIN 1625-AA00 Safety Zone; Steam Ship Col. James M. Schoonmaker Relocation Project, Maumee River, Toledo, OH...-0939 as follows: Sec. 165.T09-0939 Safety Zone; Steam Ship Col. James M. Schoonmaker relocation project...

  17. 77 FR 65818 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the Demolition Project on the Cline Avenue Bridge... demolition project on the Cline Avenue Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3...

  18. The National Program for Occupational Safety and Health in Agriculture. 1992 Project Facts.

    ERIC Educational Resources Information Center

    National Inst. for Occupational Safety and Health (DHHS/PHS), Cincinnati, OH.

    This book contains information about a project instituted in 1990 by the National Institute for Occupational Safety and Health (NIOSH) to prevent work-related diseases and injuries among agricultural workers. Included are facts about 25 projects within NIOSH and 42 cooperative agreements between NIOSH and institutions in 25 states. These…

  19. 76 FR 53054 - Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ...-AA00 Safety Zone; TriMet Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... the TriMet Bridge on the Willamette River, in Portland, OR. This action is necessary to ensure the... Zone: TriMet Bridge Project, Willamette River; Portland, OR in the Federal Register (76 FR 86). We...

  20. Analysis of Aviation Safety Reporting System Incident Data Associated With the Technical Challenges of the Vehicle Systems Safety Technology Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This analysis was conducted to support the Vehicle Systems Safety Technology (VSST) Project of the Aviation Safety Program (AVsP) milestone VSST4.2.1.01, "Identification of VSST-Related Trends." In particular, this is a review of incident data from the NASA Aviation Safety Reporting System (ASRS). The following three VSST-related technical challenges (TCs) were the focus of the incidents searched in the ASRS database: (1) Vechicle health assurance, (2) Effective crew-system interactions and decisions in all conditions; and (3) Aircraft loss of control prevention, mitigation, and recovery.

  1. Task Design for Intercultural Telecollaboration in Secondary Schools: Insights from the EU project TILA

    ERIC Educational Resources Information Center

    Hoffstaedter, Petra; Kohn, Kurt

    2014-01-01

    Our contribution focuses on synchronous oral telecollaboration in secondary schools. With reference to the EU project TILA, aspects of task design and implementation are discussed against the backdrop of issues of technological quality in connection with class organisation in computer labs. Case study evidence is provided in favour of the…

  2. The development and implementation of a hospital safety and sanitation task force.

    PubMed

    Weinstein, S A; Whelan, M

    1985-01-01

    We have found that the above activities are facilitated by utilizing a computerized filing program. The computer formal provides quick, concise reports and statistical data analysis. The formation catalogued can be easily analysis. The information catalogued can be easily categorized and analyzed. The time invested in organizational meetings concerning committee membership, guideline review and creating an efficient incident coding scheme was essential to the success of the project. Problems seem to arise when several different departments share a common space for different activities. For example, medication room sanitation throughout the hospital was suboptimal probably related to the fact that Nursing, Pharmacy and General Stores all utilized the area. No individual department felt it was their sole responsibility to ensure appropriate sanitation. Through the efforts of the task force, we were able to facilitate cooperation among the departments with each doing their share. As a result, medication rooms are now cleaner, neater and therefore safer. Additional incidents have been corrected since the original tabulation of this report. A priority goal is to facilitate corrective action in a more timely manner. It is critical that surveys should not be intended to be "white glove inspections" with criticisms placed on specific departments. This can be accomplished by informing department managers of the intent of the surveys and by allowing staff to participate in all activities. In addition, the support and cooperation of administration is a major factor in the potential success of a program of this nature. As a result of the interdisciplinary team approach, the general safety environment for patients, visitors, employees and volunteers has significantly been improved at our institution.

  3. 76 FR 17460 - South Texas Project Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...] South Texas Project Nuclear Operating Company; Establishment of Atomic Safety and Licensing Board..., 2.318, and 2.321, notice is hereby given that an Atomic Safety and Licensing Board (Board) is being...: Ronald M. Spritzer, Chair, Atomic Safety and Licensing Board Panel, U.S. Nuclear Regulatory Commission...

  4. Motivation, description, and summary status of geomechanical andgeochemical modeling studies in Task D of the InternationalDECOVALEX-THMC Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birkholzer, J.T.; Barr, D.; Rutqvist, J.

    2005-11-15

    The DECOVALEX project is an international cooperativeproject initiated by SKI, the Swedish Nuclear Power Inspectorate, withparticipation of about 10 international organizations. The general goalof this project is to encourage multidisciplinary interactive andcooperative research on modelling coupledthermo-hydro-mechanical-chemical (THMC) processes in geologic formationsin support of the performance assessment for underground storage ofradioactive waste. One of the research tasks, initiated in 2004 by theU.S. Department of Energy (DOE), addresses the long-term impact ofgeomechanical and geochemical processes on the flow conditions near wasteemplacement tunnels. Within this task, four international research teamsconduct predictive analysis of the coupled processes in two genericrepositories, using multiple approaches andmore » different computer codes.Below, we give an overview of the research task and report its currentstatus.« less

  5. A study on the effectiveness of task manager board game as a training tool in managing project

    NASA Astrophysics Data System (ADS)

    Yusof, Shahrul Azmi Mohd; Radzi, Shanizan Herman Md; Din, Sharifah Nadera Syed; Khalid, Nurhafizah

    2016-08-01

    Nowadays, games have become one of the useful tools in training. Many instructors choose to use games to enhance the way of delivering the subject. Failure to apply the suitable tool in training will lead to discouragement in learning and causing waste to the resources. An effective game will help the student understand the concept quickly. It can also help students to get involve in experiential learning where the student can manage and solve the problem as in the actual situation. This study will focus on the effectiveness of board game as a training tool for managing projects. This game has 4 tasks to be completed by students. They will be divided into a group of 4 or 5. Two methods are used in this study, pilot test, and post-test. These methods are chosen to analyze the effectiveness of using Task Manager Board Game as a teaching tool and the improvement of student's knowledge in project management. Three sub-components assessed were motivation, user experience and learning using case studies on Kirkpatrick's level one base on the perception of the students. The result indicated that the use of Task Manager board game as a training tool for managing project has a positive impact on students. It helps students to experience the situation of managing projects. It is one of the easiest ways for improving time management, human resources and communication skill.

  6. Safety training priorities

    NASA Astrophysics Data System (ADS)

    Thompson, N. A.; Ruck, H. W.

    1984-04-01

    The Air Force is interested in identifying potentially hazardous tasks and prevention of accidents. This effort proposes four methods for determining safety training priorities for job tasks in three enlisted specialties. These methods can be used to design training aimed at avoiding loss of people, time, materials, and money associated with on-the-job accidents. Job tasks performed by airmen were measured using task and job factor ratings. Combining accident reports and job inventories, subject-matter experts identified tasks associated with accidents over a 3-year period. Applying correlational, multiple regression, and cost-benefit analysis, four methods were developed for ordering hazardous tasks to determine safety training priorities.

  7. "We've Got Creative Differences": The Effects of Task Conflict and Participative Safety on Team Creative Performance

    ERIC Educational Resources Information Center

    Fairchild, Joshua; Hunter, Samuel T.

    2014-01-01

    Although both participative safety and team task conflict are widely thought to be related to team creative performance, the nature of this relationship is still not well understood, and prior studies have frequently yielded conflicting results. This study examines the ambiguity in the extant literature and proposes that "both"…

  8. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  9. Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks

    PubMed Central

    Abello, Manuel Blanco

    2014-01-01

    In resource-constrained project scheduling (RCPS) problems, ongoing tasks are restricted to utilizing a fixed number of resources. This paper investigates a dynamic version of the RCPS problem where the number of tasks varies in time. Our previous work investigated a technique called mapping of task IDs for centroid-based approach with random immigrants (McBAR) that was used to solve the dynamic problem. However, the solution-searching ability of McBAR was investigated over only a few instances of the dynamic problem. As a consequence, only a small number of characteristics of McBAR, under the dynamics of the RCPS problem, were found. Further, only a few techniques were compared to McBAR with respect to its solution-searching ability for solving the dynamic problem. In this paper, (a) the significance of the subalgorithms of McBAR is investigated by comparing McBAR to several other techniques; and (b) the scope of investigation in the previous work is extended. In particular, McBAR is compared to a technique called, Estimation Distribution Algorithm (EDA). As with McBAR, EDA is applied to solve the dynamic problem, an application that is unique in the literature. PMID:24883398

  10. Safety analysts training

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolton, P.

    The purpose of this task was to support ESH-3 in providing Airborne Release Fraction and Respirable Fraction training to safety analysts at LANL who perform accident analysis, hazard analysis, safety analysis, and/or risk assessments at nuclear facilities. The task included preparation of materials for and the conduct of two 3-day training courses covering the following topics: safety analysis process; calculation model; aerosol physic concepts for safety analysis; and overview of empirically derived airborne release fractions and respirable fractions.

  11. Inventory of Federal energy-related environment and safety research for FY 1977. Volume II. Project listings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This volume contains Biomedical and Environmental Research, Environmental Control Technology Research, and Operational and Environmental Safety Research project listings. The projects are ordered numerically by log number.

  12. Safety Aboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Mintz, Shauna M.

    2004-01-01

    As with any task that NASA takes on, safety is of utmost importaqce. There are pages of safety codes and procedures that must be followed before any idea can be brought to life. Unfortunately, the International Space Station s (ISS) safety regulations and procedures are based on lg standards rather than on Og. To aide in making this space age home away from home a less hazardous environment, I worked on several projects revolving around the dangers of flammable items in microgravity. The first task I was assigned was to track flames. This involves turning eight millimeter video recordings, of tests run in the five second drop tower, into avi format on the computer. The footage is then compressed and altered so that the flame can be seen more clearly. Using another program called Spotlight, line profiles were used to collect data describing the luminescence of the flame at different points. These raw data are saved as text files and run trough a macro so that a Matlab program can analyze it. By fitting the data to a curve and determining the areas of brightest luminescence, the behavior of the flame can be recorded numerically. After entering the data into a database, researchers can come back later and easily get information on flames resulting from different gas and liquid mixtures in microgravity. I also worked on phase two of the FATE project, which deals with safety aboard the ISS. This phase involves igniting projected droplets and determining how they react with secondary materials. Such simulations represent, on a small scale, the spread of onboard fires due to the effervescence of burning primary materials. I set up existing hardware to operate these experiments and ran tests with it, photographing the results. I also made CAD drawings of the apparatus and the area available on the (SF)2 rig for it to fit into. The experiment will later be performed on the KC-135, and the results gathered will be used to reanalyze current safety standards for the ISS

  13. Specific issues, exact locations: case study of a community mapping project to improve safety in a disadvantaged community.

    PubMed

    Qummouh, Rana; Rose, Vanessa; Hall, Pat

    2012-12-01

    Safety is a health issue and a significant concern in disadvantaged communities. This paper describes an example of community-initiated action to address perceptions of fear and safety in a suburb in south-west Sydney which led to the development of a local, community-driven research project. As a first step in developing community capacity to take action on issues of safety, a joint resident-agency group implemented a community safety mapping project to identify the extent of safety issues in the community and their exact geographical location. Two aerial maps of the suburb, measuring one metre by two metres, were placed on display at different locations for four months. Residents used coloured stickers to identify specific issues and exact locations where crime and safety were a concern. Residents identified 294 specific safety issues in the suburb, 41.9% (n=123) associated with public infrastructure, such as poor lighting and pathways, and 31.9% (n=94) associated with drug-related issues such as drug activity and discarded syringes. Good health promotion practice reflects community need. In a very practical sense, this project responded to community calls for action by mapping resident knowledge on specific safety issues and exact locations and presenting these maps to local decision makers for further action.

  14. Modeling and analyzing traffic safety perceptions: An application to the speed limit reduction pilot project in Edmonton, Alberta.

    PubMed

    El-Basyouny, Karim; El-Bassiouni, Mohamed Yahia

    2013-03-01

    To address the speeding problem in residential areas, the City of Edmonton initiated a pilot project to reduce the posted speed limit from 50km/h to 40km/h within six residential communities. This paper investigates the community perceptions of traffic safety within the six pilot communities in two phases: prior to project initiation (pre-pilot) and following the end of the project (post-pilot). This objective was accomplished by analyzing the results of two random dialing telephone surveys comprising 300 residents each. A preliminary analysis showed compatible demographic configurations for the two samples and confirmed that the residents were aware of both the posted speed limits and the adopted speed management controls. For the confirmatory factor analysis (CFA), a two-group (pre-pilot and post-pilot) three-factor model was used to assess the residents' perceptions of the speeding behavior (Speeding), their concerns about traffic safety issues (Concerns), and their perceptions of traffic safety (Safety). Comparing the CFA results of the post-pilot survey versus those of the pre-pilot survey, it was evident that there was a significant decrease in Speeding and Concerns accompanied by a significant increase in Safety. A structural equations model (SEM) was also fitted to the data in order to assess the impact of Speeding and Concerns on Safety. The results showed that Concerns increase significantly with Speeding, and that both factors have significant negative impacts on Safety. However, while the impact of Concerns on Safety was direct, that of Speeding on Safety was largely indirect (i.e., mediated through Concerns). Overall, the multivariate analysis has demonstrated that the pilot project was successful in improving the residents' perceptions of traffic safety in their community. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  15. Integration of Occupational Safety to Contractors` or Subcontractors` Performance Evaluation in Construction Projects

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Struková, Zuzana

    2013-06-01

    Several factors should be considered by the owner and general contractor in the process of contractors` and subcontractors` selection and evaluation. The paper reviews the recent models addressed to guide general contractors in subcontractors' selection process and in evaluation of different contractors during the execution of the project. Moreover the paper suggests the impact of different contractors' performance to the overall level of occupational health and safety culture at the sites. It deals with the factors influencing the safety performance of contractors during construction and analyses the methods for assessing the safety performance of construction contractors. The results of contractors' safety performance evaluation could be a useful tool in motivating contractors to achieve better safety outcomes or could have effect on owners` or general contractors' decision making about contractors suitability for future contracting works.

  16. Trends in public information within the Fairfax Alcohol Safety Action Project, 1975.

    DOT National Transportation Integrated Search

    1976-01-01

    To assess current trends in the effectiveness of the public information and education countermeasure of the Fairfax Alcohol Safety Action Project, two pieces of survey type research are conducted on a periodic basis. The roadside survey has been cond...

  17. Drinking-driving patterns at night : baseline roadside survey of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1974-01-01

    As part of the Fairfax Alcohol Safety Action Project (ASAP), staff members of the Virginia Highway Research Council, acting in their role as evaluators of the project, conducted a baseline survey of the nighttime drinking-driving patterns in Fairfax,...

  18. Social Studies Teachers' In-Service Training Needs towards Project Tasks: A Comparative Case Study

    ERIC Educational Resources Information Center

    Uyar, Melis Yesilpinar; Karakus, Fatma

    2017-01-01

    This study aims to determine in-service training needs of novice and professionally experienced social studies teachers regarding the planning, implementation and assessment processes of project tasks. The study was carried out using comparative case study from qualitative research patterns as base. Eight social studies teachers who were…

  19. Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...

  20. Management of Obstructive Sleep Apnea in Commercial Motor Vehicle Operators: Recommendations of the AASM Sleep and Transportation Safety Awareness Task Force

    PubMed Central

    Gurubhagavatula, Indira; Sullivan, Shannon; Meoli, Amy; Patil, Susheel; Olson, Ryan; Berneking, Michael; Watson, Nathaniel F.

    2017-01-01

    The American Academy of Sleep Medicine Sleep and Transportation Safety Awareness Task Force responded to the Federal Motor Carrier Safety Administration and Federal Railroad Administration Advance Notice of Proposed Rulemaking and request for public comments regarding the evaluation of safety-sensitive personnel for moderate-to-severe obstructive sleep apnea (OSA). The following document represents this response. The most salient points provided in our comments are that (1) moderate-to-severe OSA is common among commercial motor vehicle operators (CMVOs) and contributes to an increased risk of crashes; (2) objective screening methods are available and preferred for identifying at-risk drivers, with the most commonly used indicator being body mass index; (3) treatment in the form of continuous positive airway pressure (CPAP) is effective and reduces crashes; (4) CPAP is economically viable; (5) guidelines are available to assist medical examiners in determining whether CMVOs with moderate-to-severe OSA should continue to work without restrictions, with conditional certification, or be disqualified from operating commercial motor vehicles. Citation: Gurubhagavatula I, Sullivan S, Meoli A, Patil S, Olson R, Berneking M, Watson NF. Management of obstructive sleep apnea in commercial motor vehicle operators: recommendations of the AASM Sleep and Transportation Safety Awareness Task Force. J Clin Sleep Med. 2017;13(5):745–758. PMID:28356173

  1. Task Description Language

    NASA Technical Reports Server (NTRS)

    Simmons, Reid; Apfelbaum, David

    2005-01-01

    Task Description Language (TDL) is an extension of the C++ programming language that enables programmers to quickly and easily write complex, concurrent computer programs for controlling real-time autonomous systems, including robots and spacecraft. TDL is based on earlier work (circa 1984 through 1989) on the Task Control Architecture (TCA). TDL provides syntactic support for hierarchical task-level control functions, including task decomposition, synchronization, execution monitoring, and exception handling. A Java-language-based compiler transforms TDL programs into pure C++ code that includes calls to a platform-independent task-control-management (TCM) library. TDL has been used to control and coordinate multiple heterogeneous robots in projects sponsored by NASA and the Defense Advanced Research Projects Agency (DARPA). It has also been used in Brazil to control an autonomous airship and in Canada to control a robotic manipulator.

  2. Projecting the health and economic impact of road safety initiatives: a case study of a multi-country project.

    PubMed

    Esperato, Alexo; Bishai, David; Hyder, Adnan A

    2012-01-01

    The Road Safety in 10 Countries (RS-10) project will implement 12 different road safety interventions at specific sites within 10 low- and middle-income countries (LMICs). This evaluation reports the number of lives that RS-10 is projected to save in those locations, the economic value of the risk reduction, and the maximum level of investment that a public health intervention of this magnitude would be able to incur before its costs outweigh its health benefits. We assumed a 5-year time implementation horizon corresponding to the duration of RS-10. Based on a preliminary literature review, we estimated the effectiveness for each of the RS-10 interventions. Applying these effectiveness estimates to the size of the population at risk at RS-10 sites, we calculated the number of lives and life years saved (LYS) by RS-10. We projected the value of a statistical life (VSL) in each RS-10 country based on gross national income (GNI) and estimated the value of the lives saved using each country's VSL. Sensitivity analysis addressed robustness to assumptions about elasticity, discount rates, and intervention effectiveness. From the evidence base reviewed, only 13 studies met our selection criteria. Such a limited base presents uncertainties about the potential impact of the modeled interventions. We tried to account for these uncertainties by allowing effectiveness to vary ± 20 percent for each intervention. Despite this variability, RS-10 remains likely to be worth the investment. RS-10 is expected to save 10,310 lives over 5 years (discounted at 3%). VSL and $/LYS methods provide concordant results. Based on our estimates of each country's VSL, the respective countries would be willing to pay $2.45 billion to lower these fatality risks (varying intervention effectiveness by ± 20 percent, the corresponding range is $2.0-$2.9 billion). Analysis based on $/LYS shows that the RS-10 project will be cost-effective as long as its costs do not exceed $5.14 billion (under ± 20

  3. Agile Task Tracking Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duke, Roger T.; Crump, Thomas Vu

    The work was created to provide a tool for the purpose of improving the management of tasks associated with Agile projects. Agile projects are typically completed in an iterative manner with many short duration tasks being performed as part of iterations. These iterations are generally referred to as sprints. The objective of this work is to create a single tool that enables sprint teams to manage all of their tasks in multiple sprints and automatically produce all standard sprint performance charts with minimum effort. The format of the printed work is designed to mimic a standard Kanban board. The workmore » is developed as a single Excel file with worksheets capable of managing up to five concurrent sprints and up to one hundred tasks. It also includes a summary worksheet providing performance information from all active sprints. There are many commercial project management systems typically designed with features desired by larger organizations with many resources managing multiple programs and projects. The audience for this work is the small organizations and Agile project teams desiring an inexpensive, simple, user-friendly, task management tool. This work uses standard readily available software, Excel, requiring minimum data entry and automatically creating summary charts and performance data. It is formatted to print out and resemble standard flip charts and provide the visuals associated with this type of work.« less

  4. Task Analysis for Health Occupations. Cluster: Nursing. Occupation: Geriatric Aide. Education for Employment Task Lists.

    ERIC Educational Resources Information Center

    Lake County Area Vocational Center, Grayslake, IL.

    This task analysis for nursing education provides performance standards, steps to be followed, knowledge required, attitudes to be developed, safety procedures, and equipment and supplies needed for 13 tasks performed by geriatric aides in the duty area of performing diagnostic measures and for 30 tasks in the duty area of providing therapeutic…

  5. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    DOT National Transportation Integrated Search

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  6. 77 FR 70684 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  7. 78 FR 2616 - Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ...-AA00 Safety Zone; Bridge Demolition Project; Indiana Harbor Canal, East Chicago, IN AGENCY: Coast Guard... from a portion of the Indiana Harbor Canal due to the demolition Project on the Cline Avenue Bridge... Bridge, which are discussed further below. Under 5 U.S.C. 553(d)(3), the Coast Guard finds that good...

  8. Engineering and Safety Partnership Enhances Safety of the Space Shuttle Program (SSP)

    NASA Technical Reports Server (NTRS)

    Duarte, Alberto

    2007-01-01

    Project Management must use the risk assessment documents (RADs) as tools to support their decision making process. Therefore, these documents have to be initiated, developed, and evolved parallel to the life of the project. Technical preparation and safety compliance of these documents require a great deal of resources. Updating these documents after-the-fact not only requires substantial increase in resources - Project Cost -, but this task is also not useful and perhaps an unnecessary expense. Hazard Reports (HRs), Failure Modes and Effects Analysis (FMEAs), Critical Item Lists (CILs), Risk Management process are, among others, within this category. A positive action resulting from a strong partnership between interested parties is one way to get these documents and related processes and requirements, released and updated in useful time. The Space Shuttle Program (SSP) at the Marshall Space Flight Center has implemented a process which is having positive results and gaining acceptance within the Agency. A hybrid Panel, with equal interest and responsibilities for the two larger organizations, Safety and Engineering, is the focal point of this process. Called the Marshall Safety and Engineering Review Panel (MSERP), its charter (Space Shuttle Program Directive 110 F, April 15, 2005), and its Operating Control Plan emphasizes the technical and safety responsibilities over the program risk documents: HRs; FMEA/CILs; Engineering Changes; anomalies/problem resolutions and corrective action implementations, and trend analysis. The MSERP has undertaken its responsibilities with objectivity, assertiveness, dedication, has operated with focus, and has shown significant results and promising perspectives. The MSERP has been deeply involved in propulsion systems and integration, real time technical issues and other relevant reviews, since its conception. These activities have transformed the propulsion MSERP in a truly participative and value added panel, making a

  9. GROWTH OF THE INTERNATIONAL CRITICALITY SAFETY AND REACTOR PHYSICS EXPERIMENT EVALUATION PROJECTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Blair Briggs; John D. Bess; Jim Gulliford

    2011-09-01

    Since the International Conference on Nuclear Criticality Safety (ICNC) 2007, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and the International Reactor Physics Experiment Evaluation Project (IRPhEP) have continued to expand their efforts and broaden their scope. Eighteen countries participated on the ICSBEP in 2007. Now, there are 20, with recent contributions from Sweden and Argentina. The IRPhEP has also expanded from eight contributing countries in 2007 to 16 in 2011. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Criticality Safety Benchmark Experiments1' have increased from 442 evaluations (38000 pages), containing benchmark specifications for 3955 critical ormore » subcritical configurations to 516 evaluations (nearly 55000 pages), containing benchmark specifications for 4405 critical or subcritical configurations in the 2010 Edition of the ICSBEP Handbook. The contents of the Handbook have also increased from 21 to 24 criticality-alarm-placement/shielding configurations with multiple dose points for each, and from 20 to 200 configurations categorized as fundamental physics measurements relevant to criticality safety applications. Approximately 25 new evaluations and 150 additional configurations are expected to be added to the 2011 edition of the Handbook. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Reactor Physics Benchmark Experiments2' have increased from 16 different experimental series that were performed at 12 different reactor facilities to 53 experimental series that were performed at 30 different reactor facilities in the 2011 edition of the Handbook. Considerable effort has also been made to improve the functionality of the searchable database, DICE (Database for the International Criticality Benchmark Evaluation Project) and verify the accuracy of the data contained therein. DICE will be discussed in separate papers at ICNC 2011. The status of the ICSBEP and

  10. Alcohol safety action projects evaluation of operations : data, table of results, and formulation

    DOT National Transportation Integrated Search

    1979-06-01

    This volume contains the data used in the evaluation of 35 Alcohol Safety Action Projects implemented throughout the country. Historical background, discussion of analytic results and factors affecting impact detecion are contained in the document ti...

  11. Enhancing and generalizing the two-level screening approach incorporating the Highway Safety Manual (HSM) methods, phase 2.

    DOT National Transportation Integrated Search

    2016-04-01

    This project aims at developing a novel methodology to identify traffic safety hotspots and hot zones for at the macroscopic : and microscopic levels. In order to achieve these objectives, the following tasks were performed. The research team : follo...

  12. 77 FR 15009 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... zones to remain in effect throughout the duration of the construction and renewal of the Sellwood Bridge... safe distance from the construction area while transiting in the vicinity of the Sellwood Bridge...

  13. Analysis of Aviation Safety Reporting System Incident Data Associated with the Technical Challenges of the System-Wide Safety and Assurance Technologies Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2015-01-01

    The Aviation Safety Program (AvSP) System-Wide Safety and Assurance Technologies (SSAT) Project asked the AvSP Systems and Portfolio Analysis Team to identify SSAT-related trends. SSAT had four technical challenges: advance safety assurance to enable deployment of NextGen systems; automated discovery of precursors to aviation safety incidents; increasing safety of human-automation interaction by incorporating human performance, and prognostic algorithm design for safety assurance. This report reviews incident data from the NASA Aviation Safety Reporting System (ASRS) for system-component-failure- or-malfunction- (SCFM-) related and human-factor-related incidents for commercial or cargo air carriers (Part 121), commuter airlines (Part 135), and general aviation (Part 91). The data was analyzed by Federal Aviation Regulations (FAR) part, phase of flight, SCFM category, human factor category, and a variety of anomalies and results. There were 38 894 SCFM-related incidents and 83 478 human-factorrelated incidents analyzed between January 1993 and April 2011.

  14. PRELIMINARY NUCLEAR CRITICALITY NUCLEAR SAFETY EVLAUATION FOR THE CONTAINER SURVEILLANCE AND STORAGE CAPABILITY PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Low, M; Matthew02 Miller, M; Thomas Reilly, T

    2007-04-30

    Washington Safety Management Solutions (WSMS) provides criticality safety services to Washington Savannah River Company (WSRC) at the Savannah River Site. One activity at SRS is the Container Surveillance and Storage Capability (CSSC) Project, which will perform surveillances on 3013 containers (hereafter referred to as 3013s) to verify that they meet the Department of Energy (DOE) Standard (STD) 3013 for plutonium storage. The project will handle quantities of material that are greater than ANS/ANSI-8.1 single parameter mass limits, and thus required a Nuclear Criticality Safety Evaluation (NCSE). The WSMS methodology for conducting an NCSE is outlined in the WSMS methods manual.more » The WSMS methods manual currently follows the requirements of DOE-O-420.1B, DOE-STD-3007-2007, and the Washington Savannah River Company (WSRC) SCD-3 manual. DOE-STD-3007-2007 describes how a NCSE should be performed, while DOE-O-420.1B outlines the requirements for a Criticality Safety Program (CSP). The WSRC SCD-3 manual implements DOE requirements and ANS standards. NCSEs do not address the Nuclear Criticality Safety (NCS) of non-reactor nuclear facilities that may be affected by overt or covert activities of sabotage, espionage, terrorism or other security malevolence. Events which are beyond the Design Basis Accidents (DBAs) are outside the scope of a double contingency analysis.« less

  15. An injury prevention strategy for teen restaurant workers. Washington State's ProSafety project.

    PubMed

    Ward, Julie A; de Castro, A B; Tsai, Jenny Hsin-Chun; Linker, Darren; Hildahl, Lyle; Miller, Mary E

    2010-02-01

    High levels of youth employment, workplace hazards, and characteristics unique to adolescents contribute to a relatively high incidence of injuries among teens in the restaurant industry. This article discusses the ProSafety model of injury prevention among teen restaurant workers. Through integration with an existing career and technical education program, the ProSafety project seeks to prevent occupational injuries among the teen worker population through classroom safety education and internship skills reinforcement. ProSafety is the product of an innovative collaboration with occupational health nurses, business professionals, educators, and government. Its approach is derived from Social Cognitive Theory, is consistent with key values and strategies of occupational health nurses, and provides lessons for practitioners seeking to reduce occupational injuries in food service or among other populations of adolescent workers.

  16. Fall prevention and safety communication training for foremen:Report of a pilot project designed to improve residential construction safety

    PubMed Central

    Kaskutas, Vicki; Dale, Ann Marie; Lipscomb, Hester; Evanoff, Brad

    2013-01-01

    Problem Falls from heights account for 64% of residential construction worker fatalities and 20% of missed work days. We hypothesized that worker safety would improve with foremen training in fall prevention and safety communication. Method Training priorities identified through foreman and apprentice focus groups and surveys were integrated into an 8-hour training. We piloted the training with ten foremen employed by a residential builder. Carpenter trainers contrasted proper methods to protect workers from falls with methods observed at the foremen’s worksites. Trainers presented methods to deliver toolbox talks and safety messages. Results from worksite observational audits (n=29) and foremen/crewmember surveys (n=97) administered before and after training were compared. Results We found that inexperienced workers are exposed to many fall hazards that they are often not prepared to negotiate. Fall protection is used inconsistently and worksite mentorship is often inadequate. Foremen feel pressured to meet productivity demands and some are unsure of the fall protection requirements. After the training, the frequency of daily mentoring and toolbox talks increased, and these talks became more interactive and focused on hazardous daily work tasks. Foremen observed their worksites for fall hazards more often. We observed increased compliance with fall protection and decreased unsafe behaviors during worksite audits. Discussion Designing the training to meet both foremen’s and crewmembers’ needs ensured the training was learner-centered and contextually-relevant. This pilot suggests that training residential foremen can increase use of fall protection, improve safety behaviors, and enhance on-the-job training and safety communication at their worksites. Impact on Industry Construction workers’ training should target safety communication and mentoring skills with workers who will lead work crews. Interventions at multiple levels are necessary to increase safety

  17. Fall prevention and safety communication training for foremen: report of a pilot project designed to improve residential construction safety.

    PubMed

    Kaskutas, Vicki; Dale, Ann Marie; Lipscomb, Hester; Evanoff, Brad

    2013-02-01

    Falls from heights account for 64% of residential construction worker fatalities and 20% of missed work days. We hypothesized that worker safety would improve with foremen training in fall prevention and safety communication. Training priorities identified through foreman and apprentice focus groups and surveys were integrated into an 8-hour training. We piloted the training with ten foremen employed by a residential builder. Carpenter trainers contrasted proper methods to protect workers from falls with methods observed at the foremen's worksites. Trainers presented methods to deliver toolbox talks and safety messages. Results from worksite observational audits (n=29) and foremen/crewmember surveys (n=97) administered before and after training were compared. We found that inexperienced workers are exposed to many fall hazards that they are often not prepared to negotiate. Fall protection is used inconsistently and worksite mentorship is often inadequate. Foremen feel pressured to meet productivity demands and some are unsure of the fall protection requirements. After the training, the frequency of daily mentoring and toolbox talks increased, and these talks became more interactive and focused on hazardous daily work tasks. Foremen observed their worksites for fall hazards more often. We observed increased compliance with fall protection and decreased unsafe behaviors during worksite audits. Designing the training to meet both foremen's and crewmembers' needs ensured the training was learner-centered and contextually-relevant. This pilot suggests that training residential foremen can increase use of fall protection, improve safety behaviors, and enhance on-the-job training and safety communication at their worksites. Construction workers' training should target safety communication and mentoring skills with workers who will lead work crews. Interventions at multiple levels are necessary to increase safety compliance in residential construction and decrease falls

  18. The Union RAP: Industry-Wide Research-Action Projects to Win Health and Safety Improvements

    PubMed Central

    McQuiston, Thomas H.; Lippin, Tobi Mae; Anderson, Leeann G.; Beach, M. Josie; Frederick, James; Seymour, Thomas A.

    2009-01-01

    Unions are ripe to engage in community-based participatory research (CBPR). We briefly profile 3 United Steelworker CBPR projects aimed at uncovering often-undocumented, industry-wide health and safety conditions in which US industrial workers toil. The results are to be used to advocate improvements at workplace, industry, and national policy levels. We offer details of our CBPR approach (Research-Action Project [RAP]) that engages workers and others in all research stages. Elements of RAPs include strategically constructed teams with knowledge of the industry and health and safety and with skills in research, participatory facilitation, and training; reciprocal training on these knowledge and skill areas; iterative processes of large and small group work; use of technology; and facilitator-developed tools and intermediate products. PMID:19890145

  19. Promoting the safe and strategic use of technology for victims of intimate partner violence: evaluation of the technology safety project.

    PubMed

    Finn, Jerry; Atkinson, Teresa

    2009-11-01

    The Technology Safety Project of the Washington State Coalition Against Domestic Violence was designed to increase awareness and knowledge of technology safety issues for domestic violence victims, survivors, and advocacy staff. The project used a "train-the-trainer" model and provided computer and Internet resources to domestic violence service providers to (a) increase safe computer and Internet access for domestic violence survivors in Washington, (b) reduce the risk posed by abusers by educating survivors about technology safety and privacy, and (c) increase the ability of survivors to help themselves and their children through information technology. Evaluation of the project suggests that the program is needed, useful, and effective. Consumer satisfaction was high, and there was perceived improvement in computer confidence and knowledge of computer safety. Areas for future program development and further research are discussed.

  20. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    PubMed

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  1. FJET Database Project: Extract, Transform, and Load

    NASA Technical Reports Server (NTRS)

    Samms, Kevin O.

    2015-01-01

    The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

  2. Dubbing Projects for the Language Learner: A Framework for Integrating Audiovisual Translation into Task-Based Instruction

    ERIC Educational Resources Information Center

    Danan, Martine

    2010-01-01

    This article describes a series of exploratory L1 to L2 dubbing projects for which students translated and used editing software to dub short American film and TV clips into their target language. Translating and dubbing into the target language involve students in multifaceted, high-level language production tasks that lead to enhanced vocabulary…

  3. The Citizenship Safety Project: a pilot study.

    PubMed

    Frederick, K; Barlow, J

    2006-02-01

    The Government White Paper Saving Lives: Our Healthier Nation (1999) provides a clear indication that accidents are a serious public health problem and have been targeted by the Department of Health as a key area for prevention over the next 10 years. School-based injury prevention programmes have been identified as one of the key settings for the implementation of the White Paper's heath promotion strategies. The Citizen Safety Project (CSP) is a peer-delivered injury prevention programme for Year 10 students (14-15 years) and Year 2 pupils (6-7 years). This paper summarizes the findings of a pilot study that assessed the feasibility of implementing the CSP in schools and of conducting a larger study. Working as part of their Personal Social Health Education lessons, 11 pairs (n = 22) of Year 10 students developed a project to take one accident prevention theme of their choice into a primary school to teach small groups of five or six Year 2 pupils (n = 55). A formative evaluation was conducted, based on interviews with Year 2 and Year 10 teachers (n = 2), and the diaries of Year 10 students. Knowledge of accident prevention and risk awareness was measured in Year 2 pupils using the Draw and Write technique, and impact on Year 10 students was measured using self-esteem and locus of control inventories. Using both statistical and thematic analysis the study concludes that the CSP is well accepted, improves knowledge in Year 2 pupils and boosts confidence in Year 10 students, while concurrently achieving key stage attainment targets. Implications of the study are discussed in terms of future research, as are recommendations with regard to modifications to the project.

  4. The Safety project: Sentinel-1 for Civil Protection geohazars management

    NASA Astrophysics Data System (ADS)

    Monserrat, Oriol; Herrera, Gerardo; Bianchini, Silvia; González-Alonso, Elena; Onori, Roberta; Reichenbach, Paola; Carralero, Innocente P.; Barra, Anna; María Mateos, Rosa; Solari, Lorenzo; Ligüérzana, Sergio; Pagliara, Paola; Ardizzone, Francesca; Sarro, Roberto; Crosetto, Michele; Béjar-Pizarro, Marta; Moretti, Sandro; Lopez, Carmen; Garcia-Cañada, Laura; Benito-Saz, María Á.

    2017-04-01

    This work is aimed at presenting the ongoing project SAFETY (Sentinel for Geohazards regional monitoring and forecasting). The use of Differential SAR Interferometry (DInSAR) in Natural Risks management is becoming more and more exploitable thanks to the experienced growth of the techniques. On one hand, since the DInSAR technique was proposed for the first time (1989) a wide number of data processing, analysis tools and methods have been developed, on the other hand the satellite data availability has increased and provides sensors with different characteristics of sensitivity and spatial and temporal resolutions. Nowadays, DInSAR allows to have a systematic overview about the spatio-temporal activity of a natural deformation phenomena, which is an important information for the risk management in terms of prevention, emergency response and post-emergency intervention. Specifically, Sentinel-1 (A and B) satellites data show two favourable characteristics: the wide covered area and the short revisit time (6 days). The last one, if compared with the other C band available sensors, results in a reduced temporal decorrelation, particularly in non-urbanized areas, in more robust processing results (due to the higher number of images) and in an higher temporal sampling i.e. a better monitoring and activity characterization. In this context, the European project SAFETY is focused on developing tools and implementing a methodology in order to better exploit Sentinel-1 data in the Civil Protection activities of natural risks prevention. The project is aimed at providing Civil Protection Authorities (CPA) with the capability of periodically evaluating and assessing the potential impact of geohazards (volcanic activity, earthquakes, landslides and subsidence) on urban areas. The first results over the two test-areas in Spain and Italy (respectively Canary Islands and Volterra Municipality) will be presented.

  5. National Dam Safety Program. Lake Muskoday Dam (Inventory Number N.Y. 341) Delaware River Basin, Sullivan County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1981-09-14

    DACW-51-81-C-0006 . PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT PROJECT. TASK AREA & WORK UNIT NUMBERS ~ Flaherty-Giauara Associates...olie It neceary and Idontily b block number) Dam Safety National Dam Safety Program Visual Inspection Lake Muskoday Dam Hydrology, Structural Stability...DELAWARE RIVER BASIN LAKE MUSKODAY DAM SULLIVAN COUNTY, NEW YORK INVENTORY No.NY341 PHASE I INSPECTION REPORT NATIONAL DAM SAFETY PROGRAM J T C NEW YORK

  6. 77 FR 59551 - Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0767] RIN 1625-AA00 Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor... original provisions of that temporary final rule, but adds two additional safety zones necessary for the...

  7. 75 FR 47602 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ...] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01) AGENCY: Food... product will be superior to the existing therapy. FDA provides grants for clinical studies on safety and... vaccine annually) and an explanation of how the proposed study will either help support product approval...

  8. Task Analysis for Health Occupations. Cluster: Nursing. Occupation: Home Health Aide. Education for Employment Task Lists.

    ERIC Educational Resources Information Center

    Lake County Area Vocational Center, Grayslake, IL.

    This document contains a task analysis for health occupations (home health aid) in the nursing cluster. For each task listed, occupation, duty area, performance standard, steps, knowledge, attitudes, safety, equipment/supplies, source of analysis, and Illinois state goals for learning are listed. For the duty area of "providing therapeutic…

  9. Integrated Framework for Patient Safety and Energy Efficiency in Healthcare Facilities Retrofit Projects.

    PubMed

    Mohammadpour, Atefeh; Anumba, Chimay J; Messner, John I

    2016-07-01

    There is a growing focus on enhancing energy efficiency in healthcare facilities, many of which are decades old. Since replacement of all aging healthcare facilities is not economically feasible, the retrofitting of these facilities is an appropriate path, which also provides an opportunity to incorporate energy efficiency measures. In undertaking energy efficiency retrofits, it is vital that the safety of the patients in these facilities is maintained or enhanced. However, the interactions between patient safety and energy efficiency have not been adequately addressed to realize the full benefits of retrofitting healthcare facilities. To address this, an innovative integrated framework, the Patient Safety and Energy Efficiency (PATSiE) framework, was developed to simultaneously enhance patient safety and energy efficiency. The framework includes a step -: by -: step procedure for enhancing both patient safety and energy efficiency. It provides a structured overview of the different stages involved in retrofitting healthcare facilities and improves understanding of the intricacies associated with integrating patient safety improvements with energy efficiency enhancements. Evaluation of the PATSiE framework was conducted through focus groups with the key stakeholders in two case study healthcare facilities. The feedback from these stakeholders was generally positive, as they considered the framework useful and applicable to retrofit projects in the healthcare industry. © The Author(s) 2016.

  10. 78 FR 56944 - Strata Energy, Inc. (Ross In Situ Recovery Uranium Project); Notice of Atomic Safety and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ..., Inc. (Ross In Situ Recovery Uranium Project); Notice of Atomic Safety and Licensing Board Reconstitution Pursuant to 10 CFR 2.313(c) and 2.321(b), the Atomic Safety and Licensing Board (Board) in the... Craig M. White to serve on the Board in place of Administrative Judge Kenneth L. Mossman. All...

  11. A Study on Developing "An Attitude Scale for Project and Performance Tasks for Turkish Language Leaching Course"

    ERIC Educational Resources Information Center

    Demir, Tazegul

    2013-01-01

    The main purpose of this study is to demonstrate the students' attitudes towards project and performance tasks in Turkish Lessons and to develop a reliable and valid measurement tool. A total of 461 junior high school students participated in this study. In this study, firstly the preparation of items, specialist be consulted (content…

  12. LED Surgical Task Lighting Scoping Study: A Hospital Energy Alliance Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuenge, Jason R.

    Tungsten-halogen (halogen) lamps have traditionally been used to light surgical tasks in hospitals, even though they are in many respects ill-suited to the application due to the large percentage of radiant energy outside the visible spectrum and issues with color rendering/quality. Light-emitting diode (LED) technology offers potential for adjustable color and improved color rendition/quality, while simultaneously reducing side-effects from non-visible radiant energy. It also has the potential for significant energy savings, although this is a fairly narrow application in the larger commercial building energy use sector. Based on analysis of available products and Hospital Energy Alliance member interest, it ismore » recommended that a product specification and field measurement procedure be developed for implementation in demonstration projects.« less

  13. Improving safety in small enterprises through an integrated safety management intervention.

    PubMed

    Kines, Pete; Andersen, Dorte; Andersen, Lars Peter; Nielsen, Kent; Pedersen, Louise

    2013-02-01

    This study tests the applicability of a participatory behavior-based injury prevention approach integrated with safety culture initiatives. Sixteen small metal industry enterprises (10-19 employees) are randomly assigned to receive the intervention or not. Safety coaching of owners/managers result in the identification of 48 safety tasks, 85% of which are solved at follow-up. Owner/manager led constructive dialogue meetings with workers result in the prioritization of 29 tasks, 79% of which are accomplished at follow-up. Intervention enterprises have significant increases on six of eight safety-perception-survey factors, while comparisons increase on only one factor. Both intervention and comparison enterprises demonstrate significant increases in their safety observation scores. Interview data validate and supplement these results, providing some evidence for behavior change and the initiation of safety culture change. Given that over 95% of enterprises in most countries have less than 20 employees, there is great potential for adapting this integrated approach to other industries. Copyright © 2012 National Safety Council and Elsevier Ltd. All rights reserved.

  14. Quality improvement for patient safety: project-level versus program-level learning.

    PubMed

    Rivard, Peter E; Parker, Victoria A; Rosen, Amy K

    2013-01-01

    Improving quality and patient safety is of increasing strategic importance to health care organizations. However, simply increasing the volume of quality improvement (QI) activity does not necessarily improve patient outcomes. There is a need for greater understanding of QI success factors. This study looked for differences in QI implementation across hospitals with a range of performance on Patient Safety Indicators. We conducted an exploratory comparative case study of 4 Veterans Health Administration hospitals including site visits and interviews with leaders and staff. Two themes emerged. Project-level QI learning is assessing and modifying specific QI projects relative to expectations. Program-level QI learning is assessing and modifying the overall QI endeavor. The nature of project-level QI learning was similar across sites, whereas we identified qualitative differences across organizations in program-level QI learning. The highest performing organization was evaluating and refining its overall approach to QI, whereas the others were learning how to build and control QI programs. Program-level QI learning may be key if a QI program is to succeed in improving patient outcomes. This type of organizational learning entails a big-picture, organization-wide view of QI. It also entails second-order organizational learning based on assessment not only of whether QI is being done correctly but also whether the right QI activities are being done, for the right reasons. The organization is "learning to learn." In addition to gaining mastery and control of QI, leaders regularly engage with staff in rethinking QI and experimenting with new approaches. Leaders also assess how QI activity fits in the organization's developmental journey and how it supports realization of strategy.

  15. Gaze entropy reflects surgical task load.

    PubMed

    Di Stasi, Leandro L; Diaz-Piedra, Carolina; Rieiro, Héctor; Sánchez Carrión, José M; Martin Berrido, Mercedes; Olivares, Gonzalo; Catena, Andrés

    2016-11-01

    Task (over-)load imposed on surgeons is a main contributing factor to surgical errors. Recent research has shown that gaze metrics represent a valid and objective index to asses operator task load in non-surgical scenarios. Thus, gaze metrics have the potential to improve workplace safety by providing accurate measurements of task load variations. However, the direct relationship between gaze metrics and surgical task load has not been investigated yet. We studied the effects of surgical task complexity on the gaze metrics of surgical trainees. We recorded the eye movements of 18 surgical residents, using a mobile eye tracker system, during the performance of three high-fidelity virtual simulations of laparoscopic exercises of increasing complexity level: Clip Applying exercise, Cutting Big exercise, and Translocation of Objects exercise. We also measured performance accuracy and subjective rating of complexity. Gaze entropy and velocity linearly increased with increased task complexity: Visual exploration pattern became less stereotyped (i.e., more random) and faster during the more complex exercises. Residents performed better the Clip Applying exercise and the Cutting Big exercise than the Translocation of Objects exercise and their perceived task complexity differed accordingly. Our data show that gaze metrics are a valid and reliable surgical task load index. These findings have potential impacts to improve patient safety by providing accurate measurements of surgeon task (over-)load and might provide future indices to assess residents' learning curves, independently of expensive virtual simulators or time-consuming expert evaluation.

  16. Task Analysis for Health Occupations. Cluster: Nursing. Occupation: Professional Nurse (Associate Degree). Education for Employment Task Lists.

    ERIC Educational Resources Information Center

    Lake County Area Vocational Center, Grayslake, IL.

    This document contains a task analysis for health occupations (professional nurse) in the nursing cluster. For each task listed, occupation, duty area, performance standard, steps, knowledge, attitudes, safety, equipment/supplies, source of analysis, and Illinois state goals for learning are listed. For the duty area of "providing therapeutic…

  17. Functional Task Test (FTT)

    NASA Technical Reports Server (NTRS)

    Bloomberg, Jacob J.; Mulavara, Ajitkumar; Peters, Brian T.; Rescheke, Millard F.; Wood, Scott; Lawrence, Emily; Koffman, Igor; Ploutz-Snyder, Lori; Spiering, Barry A.; Feeback, Daniel L.; hide

    2009-01-01

    This slide presentation reviews the Functional Task Test (FTT), an interdisciplinary testing regimen that has been developed to evaluate astronaut postflight functional performance and related physiological changes. The objectives of the project are: (1) to develop a set of functional tasks that represent critical mission tasks for the Constellation Program, (2) determine the ability to perform these tasks after space flight, (3) Identify the key physiological factors that contribute to functional decrements and (4) Use this information to develop targeted countermeasures.

  18. Blood alcohol test results of motor vehicle deaths as an evaluation method for the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1973-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was started following the June 1971 approval of the proposal and working plan submitted to the Department of Transportation by the Highway Safety Division of Virginia. A total of $2,123,000 was allocat...

  19. West Virginia Peer Exchange : Streamlining Highway Safety Improvement Program Project Delivery - An RSPCB Peer Exchange

    DOT National Transportation Integrated Search

    2014-09-01

    The West Virginia Division of Highways (WV DOH) hosted a Peer Exchange to share information and experiences for streamlining Highway Safety Improvement Program (HSIP) project delivery. The event was held September 23 to 24, 2014 in Charleston, West V...

  20. Projected Impact of Compositional Verification on Current and Future Aviation Safety Risk

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.; Withrow, Colleen A.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    The projected impact of compositional verification research conducted by the National Aeronautic and Space Administration System-Wide Safety and Assurance Technologies on aviation safety risk was assessed. Software and compositional verification was described. Traditional verification techniques have two major problems: testing at the prototype stage where error discovery can be quite costly and the inability to test for all potential interactions leaving some errors undetected until used by the end user. Increasingly complex and nondeterministic aviation systems are becoming too large for these tools to check and verify. Compositional verification is a "divide and conquer" solution to addressing increasingly larger and more complex systems. A review of compositional verification research being conducted by academia, industry, and Government agencies is provided. Forty-four aviation safety risks in the Biennial NextGen Safety Issues Survey were identified that could be impacted by compositional verification and grouped into five categories: automation design; system complexity; software, flight control, or equipment failure or malfunction; new technology or operations; and verification and validation. One capability, 1 research action, 5 operational improvements, and 13 enablers within the Federal Aviation Administration Joint Planning and Development Office Integrated Work Plan that could be addressed by compositional verification were identified.

  1. The Development and Implementation of Ground Safety Requirements for Project Orion Abort Flight Testing - A Case Study

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul D.; Williams, Jeffrey G.; Condzella, Bill R.

    2008-01-01

    A rigorous set of detailed ground safety requirements is required to make sure that ground support equipment (GSE) and associated planned ground operations are conducted safely. Detailed ground safety requirements supplement the GSE requirements already called out in NASA-STD-5005. This paper will describe the initial genesis of these ground safety requirements, the establishment and approval process and finally the implementation process for Project Orion. The future of the requirements will also be described. Problems and issues encountered and overcame will be discussed.

  2. Engaging Agribusinesses: Feasibility and Cost of an ATV Safety Poster Project.

    PubMed

    Jennissen, Charles A; Sweat, Shane; Wetjen, Kristel; Hoogerwerf, Pam; Denning, Gerene M

    2017-01-01

    All-terrain vehicle (ATV)-related deaths and injuries continue to be a significant problem. Influential change agents such as agribusinesses could be important partners for improving safety behaviors among rural ATV users. Our objective was to determine how effectively an injury prevention project could engage agribusinesses through the postal service and to assess their willingness to display a safety poster. One thousand two hundred forty-four agribusinesses received an ATV safety poster and a postcard survey by mail. A randomized sampling of these businesses was surveyed by telephone 4-7 weeks later. Telephone survey questions included whether they recalled receiving the poster, and if so, whether, where and how long the poster was displayed. One hundred six postcards were returned. Of the 192 eligible business persons contacted by telephone, 89% agreed to participate. Approximately one-third of telephone survey participants recalled receiving the poster. Among these, 81% with walk-in customers posted it, and 74% still had it displayed 1 month later. Of participants who did not recall receiving the poster, 83% stated they would have displayed the poster. The cost of displaying each poster in a business was 16.6 cents/day during the first month. Final costs/day would be much less because of continued display. A high percentage of agribusinesses displayed or would have displayed an ATV safety poster, and most displayed it beyond 1 month. Unfortunately, participant recruitment via postal delivery alone was challenging. Nevertheless, mass mailing of injury prevention materials to be displayed in the retail setting may be a low cost method for raising safety awareness.

  3. Clustered Multi-Task Learning for Automatic Radar Target Recognition

    PubMed Central

    Li, Cong; Bao, Weimin; Xu, Luping; Zhang, Hua

    2017-01-01

    Model training is a key technique for radar target recognition. Traditional model training algorithms in the framework of single task leaning ignore the relationships among multiple tasks, which degrades the recognition performance. In this paper, we propose a clustered multi-task learning, which can reveal and share the multi-task relationships for radar target recognition. To further make full use of these relationships, the latent multi-task relationships in the projection space are taken into consideration. Specifically, a constraint term in the projection space is proposed, the main idea of which is that multiple tasks within a close cluster should be close to each other in the projection space. In the proposed method, the cluster structures and multi-task relationships can be autonomously learned and utilized in both of the original and projected space. In view of the nonlinear characteristics of radar targets, the proposed method is extended to a non-linear kernel version and the corresponding non-linear multi-task solving method is proposed. Comprehensive experimental studies on simulated high-resolution range profile dataset and MSTAR SAR public database verify the superiority of the proposed method to some related algorithms. PMID:28953267

  4. Implementation of Task-Tracking Software for Clinical IT Management.

    PubMed

    Purohit, Anne-Maria; Brutscheck, Clemens; Prokosch, Hans-Ulrich; Ganslandt, Thomas; Schneider, Martin

    2017-01-01

    Often in clinical IT departments, many different methods and IT systems are used for task-tracking and project organization. Based on managers' personal preferences and knowledge about project management methods, tools differ from team to team and even from employee to employee. This causes communication problems, especially when tasks need to be done in cooperation with different teams. Monitoring tasks and resources becomes impossible: there are no defined deliverables, which prevents reliable deadlines. Because of these problems, we implemented task-tracking software which is now in use across all seven teams at the University Hospital Erlangen. Over a period of seven months, a working group defined types of tasks (project, routine task, etc.), workflows, and views to monitor the tasks of the 7 divisions, 20 teams and 340 different IT services. The software has been in use since December 2016.

  5. Safety Systems

    ERIC Educational Resources Information Center

    Halligan, Tom

    2009-01-01

    Colleges across the country are rising to the task by implementing safety programs, response strategies, and technologies intended to create a secure environment for teachers and students. Whether it is preparing and responding to a natural disaster, health emergency, or act of violence, more schools are making campus safety a top priority. At…

  6. Fairfax Alcohol Safety Action Project second year evaluation summary : a report prepared by the Virginia Highway and Transportation Research Council under the sponsorship of the Highway Safety Division of Virginia.

    DOT National Transportation Integrated Search

    1974-01-01

    The Fairfax Alcohol Safety Action Project (ASAP) was begun in January 1972 as one of thirty-five federally funded demonstration projects designed to implement and evaluate a comprehensive community alcohol countermeasures program. The Fairfax ASAP wa...

  7. SafetyAnalyst Testing and Implementation

    DOT National Transportation Integrated Search

    2009-03-01

    SafetyAnalyst is a software tool developed by the Federal Highway Administration to assist state and local transportation agencies on analyzing safety data and managing their roadway safety programs. This research report documents the major tasks acc...

  8. Application of the SEIPS Model to Analyze Medication Safety in a Crisis Residential Center.

    PubMed

    Steele, Maria L; Talley, Brenda; Frith, Karen H

    2018-02-01

    Medication safety and error reduction has been studied in acute and long-term care settings, but little research is found in the literature regarding mental health settings. Because mental health settings are complex, medication administration is vulnerable to a variety of errors from transcription to administration. The purpose of this study was to analyze critical factors related to a mental health work system structure and processes that threaten safe medication administration practices. The Systems Engineering Initiative for Patient Safety (SEIPS) model provides a framework to analyze factors affecting medication safety. The model approach analyzes the work system concepts of technology, tasks, persons, environment, and organization to guide the collection of data. In the study, the Lean methodology tools were used to identify vulnerabilities in the system that could be targeted later for improvement activities. The project director completed face-to-face interviews, asked nurses to record disruptions in a log, and administered a questionnaire to nursing staff. The project director also conducted medication chart reviews and recorded medication errors using a standardized taxonomy for errors that allowed categorization of the prevalent types of medication errors. Results of the study revealed disruptions during the medication process, pharmacology training needs, and documentation processes as the primary opportunities for improvement. The project engaged nurses to identify sustainable quality improvement strategies to improve patient safety. The mental health setting carries challenges for safe medication administration practices. Through analysis of the structure, process, and outcomes of medication administration, opportunities for quality improvement and sustainable interventions were identified, including minimizing the number of distractions during medication administration, training nurses on psychotropic medications, and improving the documentation

  9. Report of the Fermilab ILC Citizens' Task Force

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Fermi National Accelerator Laboratory convened the ILC Citizens' Task Force to provide guidance and advice to the laboratory to ensure that community concerns and ideas are included in all public aspects of planning and design for a proposed future accelerator, the International Linear Collider. In this report, the members of the Task Force describe the process they used to gather and analyze information on all aspects of the proposed accelerator and its potential location at Fermilab in northern Illinois. They present the conclusions and recommendations they reached as a result of the learning process and their subsequent discussions and deliberations.more » While the Task Force was charged to provide guidance on the ILC, it became clear during the process that the high cost of the proposed accelerator made a near-term start for the project at Fermilab unlikely. Nevertheless, based on a year of extensive learning and dialogue, the Task Force developed a series of recommendations for Fermilab to consider as the laboratory develops all successor projects to the Tevatron. The Task Force recognizes that bringing a next-generation particle physics project to Fermilab will require both a large international effort and the support of the local community. While the Task Force developed its recommendations in response to the parameters of a future ILC, the principles they set forth apply directly to any large project that may be conceived at Fermilab, or at other laboratories, in the future. With this report, the Task Force fulfills its task of guiding Fermilab from the perspective of the local community on how to move forward with a large-scale project while building positive relationships with surrounding communities. The report summarizes the benefits, concerns and potential impacts of bringing a large-scale scientific project to northern Illinois.« less

  10. Analysis of factors influencing safety management for metro construction in China.

    PubMed

    Yu, Q Z; Ding, L Y; Zhou, C; Luo, H B

    2014-07-01

    With the rapid development of urbanization in China, the number and size of metro construction projects are increasing quickly. At the same time, and increasing number of accidents in metro construction make it a disturbing focus of social attention. In order to improve safety management in metro construction, an investigation of the participants' perspectives on safety factors in China metro construction has been conducted to identify the key safety factors, and their ranking consistency among the main participants, including clients, consultants, designers, contractors and supervisors. The result of factor analysis indicates that there are five key factors which influence the safety of metro construction including safety attitude, construction site safety, government supervision, market restrictions and task unpredictability. In addition, ANOVA and Spearman rank correlation coefficients were performed to test the consistency of the means rating and the ranking of safety factors. The results indicated that the main participants have significant disagreement about the importance of safety factors on more than half of the items. Suggestions and recommendations on practical countermeasures to improve metro construction safety management in China are proposed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Access Restoration Project Task 1.2 Report 2 (of 2) Algorithms for Debris Volume and Water Depth Computation : Appendix A

    DOT National Transportation Integrated Search

    0000-01-01

    n the Access Restoration Project Task 1.2 Report 1, the algorithms for detecting roadway debris piles and flooded areas were described in detail. Those algorithms take CRS data as input and automatically detect the roadway obstructions. Although the ...

  12. 77 FR 40891 - Towing Safety Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... ``Recommendations for Safety Standards of Portable Facility Vapor Control Systems.'' (4) Period for public comment... teleconference to review and discuss a new Task Statement titled ``Recommendations for Safety Standards of Portable Facility Vapor Control Systems'' and to discuss the progress of open Task Statements. This meeting...

  13. 14. Implementation, execution, and completion of projects.

    PubMed

    2014-05-01

    Once an intervention has been selected for implementation, it becomes a project. Implementation of a project is a complex process and requires completion of a host of tasks. The implementation process has been deconstructed into its components so that it can be analysed and evaluated. A prerequisite for implementation is an operational plan. The tasks that require completion include: (1) reassessing current status and verifying the needs; (2) activating the operational plan; (3) setting-up and operating an administrative structure; (4) identifying, acquiring, and organising resources (including human resources); (5) assigning roles and responsibilities; (6) educating and training personnel (including mission-specific); (7) briefing staff; (8) preparing/readying resources for transport; (9) assuring project self-sufficiency; (10) arranging for personal necessities; (11) ensuring the safety of personnel and the security of equipment and supplies; (12) insuring personnel; (13) coordinating with other projects/actors; (14) coordinating with other BSF systems (role of the coordination and control centre); (15) communicating with community leaders; (16) initiating the use of standardised progress reports; (17) deploying personnel, equipment, and supplies; (18) initiating the intervention(s); (19) executing the intervention(s); (20) reporting start of interventions; (21) completing the project; and (22) completing and submitting a formal report. This deconstruction is essential in order to study the process and identify critical points of success and failure. It also is recognised that many interventions consist of many components (subfunctions), each of which may be considered a production process.

  14. Analysis of Aviation Safety Reporting System Incident Data Associated with the Technical Challenges of the Atmospheric Environment Safety Technology Project

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Reveley, Mary S.

    2014-01-01

    This study analyzed aircraft incidents in the NASA Aviation Safety Reporting System (ASRS) that apply to two of the three technical challenges (TCs) in NASA's Aviation Safety Program's Atmospheric Environment Safety Technology Project. The aircraft incidents are related to airframe icing and atmospheric hazards TCs. The study reviewed incidents that listed their primary problem as weather or environment-nonweather between 1994 and 2011 for aircraft defined by Federal Aviation Regulations (FAR) Parts 121, 135, and 91. The study investigated the phases of flight, a variety of anomalies, flight conditions, and incidents by FAR part, along with other categories. The first part of the analysis focused on airframe-icing-related incidents and found 275 incidents out of 3526 weather-related incidents over the 18-yr period. The second portion of the study focused on atmospheric hazards and found 4647 incidents over the same time period. Atmospheric hazards-related incidents included a range of conditions from clear air turbulence and wake vortex, to controlled flight toward terrain, ground encounters, and incursions.

  15. Local police enforcement, public information and education strategies to foster more and proper use of child safety seats by toddlers : evaluation of a demonstration project

    DOT National Transportation Integrated Search

    1994-03-01

    This project evaluated the effects of enforcing safety belt (SB)/child safety seat (CSS) laws and providing public information and education (PI&E) about the laws and use and proper use of CSSs--without external funding. Project goals focused on incr...

  16. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  17. Optimizing the delivery of contraceptives in low- and middle-income countries through task shifting: a systematic review of effectiveness and safety.

    PubMed

    Polus, Stephanie; Lewin, Simon; Glenton, Claire; Lerberg, Priya M; Rehfuess, Eva; Gülmezoglu, A Metin

    2015-04-01

    To assess the effectiveness and safety of task shifting for the delivery of injectable contraceptives, contraceptive implants, intrauterine devices (IUDs), tubal ligation and vasectomy in low- and middle-income countries. Multiple electronic databases were searched up to 25 May 2012 for studies which had assessed the delivery of contraceptives by health workers with lower levels of training, compared to delivery by health workers usually assigned this role, or compared to no organized provision of contraceptives. We included randomized controlled trials, non-randomized controlled trials, controlled before-after studies, and interrupted time series. Data were extracted using a standard form and the certainty of the evidence found was assessed using GRADE. We identified six randomized controlled trials published between 1977 and 1995 that assessed the safety and effectiveness of task shifting for the delivery of long-term contraceptives. Two studies assessed IUD insertion by nurses compared to doctors, two assessed IUD insertion by auxiliary nurse-midwives compared to doctors, one assessed tubal ligation by midwives compared to doctors, and one assessed the delivery of vasectomy by medical students compared to doctors. In general, little or no difference was found in contraceptive outcomes between cadres. Study design limitations and the low number of eligible studies, however, allow only limited conclusions to be drawn. The findings indicate that task shifting for the delivery of long-term contraceptives may be a safe and effective approach to increasing access to contraception. Further research is needed because the certainty of the evidence identified is variable.

  18. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    NASA Technical Reports Server (NTRS)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  19. Advancing the hydrogen safety knowledge base

    DOE PAGES

    Weiner, S. C.

    2014-08-29

    The International Energy Agency's Hydrogen Implementing Agreement (IEA HIA) was established in 1977 to pursue collaborative hydrogen research and development and information exchange among its member countries. Information and knowledge dissemination is a key aspect of the work within IEA HIA tasks, and case studies, technical reports and presentations/publications often result from the collaborative efforts. The work conducted in hydrogen safety under Task 31 and its predecessor, Task 19, can positively impact the objectives of national programs even in cases for which a specific task report is not published. As a result, the interactions within Task 31 illustrate how technologymore » information and knowledge exchange among participating hydrogen safety experts serve the objectives intended by the IEA HIA.« less

  20. A continuous quality improvement project to reduce medication error in the emergency department.

    PubMed

    Lee, Sara Bc; Lee, Larry Ly; Yeung, Richard Sd; Chan, Jimmy Ts

    2013-01-01

    Medication errors are a common source of adverse healthcare incidents particularly in the emergency department (ED) that has a number of factors that make it prone to medication errors. This project aims to reduce medication errors and improve the health and economic outcomes of clinical care in Hong Kong ED. In 2009, a task group was formed to identify problems that potentially endanger medication safety and developed strategies to eliminate these problems. Responsible officers were assigned to look after seven error-prone areas. Strategies were proposed, discussed, endorsed and promulgated to eliminate the problems identified. A reduction of medication incidents (MI) from 16 to 6 was achieved before and after the improvement work. This project successfully established a concrete organizational structure to safeguard error-prone areas of medication safety in a sustainable manner.

  1. Challenges in ethics, safety, best practices, and oversight regarding HIT vendors, their customers, and patients: a report of an AMIA special task force.

    PubMed

    Goodman, Kenneth W; Berner, Eta S; Dente, Mark A; Kaplan, Bonnie; Koppel, Ross; Rucker, Donald; Sands, Daniel Z; Winkelstein, Peter

    2011-01-01

    The current commercial health information technology (HIT) arena encompasses a number of competing firms that provide electronic health applications to hospitals, clinical practices, and other healthcare-related entities. Such applications collect, store, and analyze patient information. Some vendors incorporate contract language whereby purchasers of HIT systems, such as hospitals and clinics, must indemnify vendors for malpractice or personal injury claims, even if those events are not caused or fostered by the purchasers. Some vendors require contract clauses that force HIT system purchasers to adopt vendor-defined policies that prevent the disclosure of errors, bugs, design flaws, and other HIT-software-related hazards. To address this issue, the AMIA Board of Directors appointed a Task Force to provide an analysis and insights. Task Force findings and recommendations include: patient safety should trump all other values; corporate concerns about liability and intellectual property ownership may be valid but should not over-ride all other considerations; transparency and a commitment to patient safety should govern vendor contracts; institutions are duty-bound to provide ethics education to purchasers and users, and should commit publicly to standards of corporate conduct; and vendors, system purchasers, and users should encourage and assist in each others' efforts to adopt best practices. Finally, the HIT community should re-examine whether and how regulation of electronic health applications could foster improved care, public health, and patient safety.

  2. Challenges in ethics, safety, best practices, and oversight regarding HIT vendors, their customers, and patients: a report of an AMIA special task force

    PubMed Central

    Berner, Eta S; Dente, Mark A; Kaplan, Bonnie; Koppel, Ross; Rucker, Donald; Sands, Daniel Z; Winkelstein, Peter

    2010-01-01

    The current commercial health information technology (HIT) arena encompasses a number of competing firms that provide electronic health applications to hospitals, clinical practices, and other healthcare-related entities. Such applications collect, store, and analyze patient information. Some vendors incorporate contract language whereby purchasers of HIT systems, such as hospitals and clinics, must indemnify vendors for malpractice or personal injury claims, even if those events are not caused or fostered by the purchasers. Some vendors require contract clauses that force HIT system purchasers to adopt vendor-defined policies that prevent the disclosure of errors, bugs, design flaws, and other HIT-software-related hazards. To address this issue, the AMIA Board of Directors appointed a Task Force to provide an analysis and insights. Task Force findings and recommendations include: patient safety should trump all other values; corporate concerns about liability and intellectual property ownership may be valid but should not over-ride all other considerations; transparency and a commitment to patient safety should govern vendor contracts; institutions are duty-bound to provide ethics education to purchasers and users, and should commit publicly to standards of corporate conduct; and vendors, system purchasers, and users should encourage and assist in each others' efforts to adopt best practices. Finally, the HIT community should re-examine whether and how regulation of electronic health applications could foster improved care, public health, and patient safety. PMID:21075789

  3. Project Operations: Flood Control Operations and Maintenance Policies

    DTIC Science & Technology

    1996-10-30

    President and an internal review performed by the Corps task group shortly after failure of the Teton Dam , we have undertaken numerous actions to modify our...practice for design, construction and operation of Corps reservoir projects. One important item as a result of the Teton Dam failure and the review...1 Glossary 1-4 1-2 CHAPTER 2 - Dam Operations Management Purpose 2-1 2-1 Policy 2-2 2-1 Emergency Plan 2-3 2-1 Dam Safety Training 2-4 2-2

  4. Trends in drinking-driving at night : a comparison of the four roadside surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1975-01-01

    As part of the Fairfax Alcohol Safety Action Project (ASAP), staff members of the Virginia. Highway and Transportation Research Council, acting in their role as evaluators of the project, have conducted four nighttime roadside surveys in Fairfax, Vir...

  5. Suborbital Safety Technical Committee- Summary of Proposed Standards & Guidelines

    NASA Astrophysics Data System (ADS)

    Quinn, Andy; Atencia Yepez, Amaya; Klicker, Michael; Howard, Diane; Verstraeten, Joram; Other Suborbital Safety TC Members

    2013-09-01

    There are currently no international safety standards and guidelines to assist designers, operators and authorities in the suborbital domain. There is a launch licensing regime in the United States (US) to assist the forerunners of the suborbital domain however this does not provide a safety approval for the vehicle against set standards or does not have an acceptable level of safety to achieve in terms of design or operation. In Europe a certification framework may be implemented however this (or any regulatory framework) is not in place as yet. This paper summarises the 5 tasks thus far completed by the International Association for the Advancement of Space Safety (IAASS) Suborbital Safety Technical Committee (SS TC) in terms of deriving standards and guidelines for the suborbital domain. The SS TC comprises members from the suborbital industry (US and European vehicle designers), safety experts, legal experts, medical/training experts, prospective spaceport operators and members from the US and European authorities (though these members cannot directly steer the standards and guidelines - they can merely review them for interest and comment on non-policy aspects). The SS TC has been divided into three working groups (WG): Regulatory WG, Technical WG and Operations WG. The 5 tasks that are summarised in this paper include: Regulatory WG - (Task 1) Clarify and promote regulatory framework for suborbital flights (including discussions on Space Law 'v' Air Law for suborbital domain); Technical WG - (Task 1) Defining & Alignment (globally) of Safety Criteria for Suborbital domain using industry best practices, (Task 2) Software/complex hardware certification for suborbital flights; Operations WG - (Task 1) Flight Crew and Spaceflight Participant Medical and Training Standards & Guidelines for suborbital flight, (Task 2) Spaceport Safety Management System. This paper also details the next set of standards and guidelines that will be derived by the SS TC. The paper

  6. NASA's Software Safety Standard

    NASA Technical Reports Server (NTRS)

    Ramsay, Christopher M.

    2007-01-01

    NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those

  7. Verification and Implementation of Operations Safety Controls for Flight Missions

    NASA Technical Reports Server (NTRS)

    Jones, Cheryl L.; Smalls, James R.; Carrier, Alicia S.

    2010-01-01

    Approximately eleven years ago, the International Space Station launched the first module from Russia, the Functional Cargo Block (FGB). Safety and Mission Assurance (S&MA) Operations (Ops) Engineers played an integral part in that endeavor by executing strict flight product verification as well as continued staffing of S&MA's console in the Mission Evaluation Room (MER) for that flight mission. How were these engineers able to conduct such a complicated task? They conducted it based on product verification that consisted of ensuring that safety requirements were adequately contained in all flight products that affected crew safety. S&MA Ops engineers apply both systems engineering and project management principles in order to gain a appropriate level of technical knowledge necessary to perform thorough reviews which cover the subsystem(s) affected. They also ensured that mission priorities were carried out with a great detail and success.

  8. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the ecological assessment task, Kingfisher Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This report provides specific details and requirements for the WAG 2 remedial investigation and site investigation Ecological Assessment Task, Kingfisher Study, including information that will contribute to safe completion of the project. The report includes historical background; a site map; project organization; task descriptions and hazard evaluations; controls; and monitoring, personal protective equipment, decontamination, and medical surveillance program requirements. The report also includes descriptions of site personnel and their certifications as well as suspected WAG 2 contaminants and their characteristics. The primary objective of the WAG 2 Kingfisher Study is to assess the feasibility of using kingfishers as biological monitorsmore » of contaminants on the Oak Ridge Reservation (ORR). Kingfisher sample collection will be used to determine the levels of contaminants and degree of bioaccumulation within a common piscivorous bird feeding on contaminated fish from streams on the ORR.« less

  9. Near Real-Time Surveillance for Influenza Vaccine Safety: Proof-of-Concept in the Vaccine Safety Datalink Project

    PubMed Central

    Greene, Sharon K.; Kulldorff, Martin; Lewis, Edwin M.; Li, Rong; Yin, Ruihua; Weintraub, Eric S.; Fireman, Bruce H.; Lieu, Tracy A.; Nordin, James D.; Glanz, Jason M.; Baxter, Roger; Jacobsen, Steven J.; Broder, Karen R.; Lee, Grace M.

    2010-01-01

    The emergence of pandemic H1N1 influenza in 2009 has prompted public health responses, including production and licensure of new influenza A (H1N1) 2009 monovalent vaccines. Safety monitoring is a critical component of vaccination programs. As proof-of-concept, the authors mimicked near real-time prospective surveillance for prespecified neurologic and allergic adverse events among enrollees in 8 medical care organizations (the Vaccine Safety Datalink Project) who received seasonal trivalent inactivated influenza vaccine during the 2005/06–2007/08 influenza seasons. In self-controlled case series analysis, the risk of adverse events in a prespecified exposure period following vaccination was compared with the risk in 1 control period for the same individual either before or after vaccination. In difference-in-difference analysis, the relative risk in exposed versus control periods each season was compared with the relative risk in previous seasons since 2000/01. The authors used Poisson-based analysis to compare the risk of Guillian-Barré syndrome following vaccination in each season with that in previous seasons. Maximized sequential probability ratio tests were used to adjust for repeated analyses on weekly data. With administration of 1,195,552 doses to children under age 18 years and 4,773,956 doses to adults, no elevated risk of adverse events was identified. Near real-time surveillance for selected adverse events can be implemented prospectively to rapidly assess seasonal and pandemic influenza vaccine safety. PMID:19965887

  10. Utilizing data consortia to monitor safety and effectiveness of biosimilars and their innovator products.

    PubMed

    Baldziki, Mike; Brown, Jeff; Chan, Hungching; Cheetham, T Craig; Conn, Thomas; Daniel, Gregory W; Hendrickson, Mark; Hilbrich, Lutz; Johnson, Ayanna; Miller, Steven B; Moore, Tom; Motheral, Brenda; Priddy, Sarah A; Raebel, Marsha A; Randhawa, Gurvaneet; Surratt, Penny; Walraven, Cheryl; White, T Jeff; Bruns, Kevin; Carden, Mary Jo; Dragovich, Charlie; Eichelberger, Bernadette; Rosato, Edith; Sega, Todd

    2015-01-01

    The Biologics Price Competition and Innovation Act, introduced as part of the Affordable Care Act, directed the FDA to create an approval pathway for biologic products shown to be biosimilar or interchangeable with an FDA-approved innovator drug. These biosimilars will not be chemically identical to the reference agent. Investigational studies conducted with biosimilar agents will likely provide limited real-world evidence of their effectiveness and safety. How do we best monitor effectiveness and safety of biosimilar products once approved by the FDA and used more extensively by patients? To determine the feasibility of developing a distributed research network that will use health insurance plan and health delivery system data to detect biosimilar safety and effectiveness signals early and be able to answer important managed care pharmacy questions from both the government and managed care organizations. Twenty-one members of the AMCP Task Force on Biosimilar Collective Intelligence Systems met November 12, 2013, to discuss issues involved in designing this consortium and to explore next steps. The task force concluded that a managed care biosimilars research consortium would be of significant value. Task force members agreed that it is best to use a distributed research network structurally similar to existing DARTNet, HMO Research Network, and Mini-Sentinel consortia. However, for some surveillance projects that it undertakes, the task force recognizes it may need supplemental data from managed care and other sources (i.e., a "hybrid" structure model). The task force believes that AMCP is well positioned to lead the biosimilar-monitoring effort and that the next step to developing a biosimilar-innovator collective intelligence system is to convene an advisory council to address organizational governance.

  11. Are automatic systems the future of motorcycle safety? A novel methodology to prioritize potential safety solutions based on their projected effectiveness.

    PubMed

    Gil, Gustavo; Savino, Giovanni; Piantini, Simone; Baldanzini, Niccolò; Happee, Riender; Pierini, Marco

    2017-11-17

    Motorcycle riders are involved in significantly more crashes per kilometer driven than passenger car drivers. Nonetheless, the development and implementation of motorcycle safety systems lags far behind that of passenger cars. This research addresses the identification of the most effective motorcycle safety solutions in the context of different countries. A knowledge-based system of motorcycle safety (KBMS) was developed to assess the potential for various safety solutions to mitigate or avoid motorcycle crashes. First, a set of 26 common crash scenarios was identified from the analysis of multiple crash databases. Second, the relative effectiveness of 10 safety solutions was assessed for the 26 crash scenarios by a panel of experts. Third, relevant information about crashes was used to weigh the importance of each crash scenario in the region studied. The KBMS method was applied with an Italian database, with a total of more than 1 million motorcycle crashes in the period 2000-2012. When applied to the Italian context, the KBMS suggested that automatic systems designed to compensate for riders' or drivers' errors of commission or omission are the potentially most effective safety solution. The KBMS method showed an effective way to compare the potential of various safety solutions, through a scored list with the expected effectiveness of each safety solution for the region to which the crash data belong. A comparison of our results with a previous study that attempted a systematic prioritization of safety systems for motorcycles (PISa project) showed an encouraging agreement. Current results revealed that automatic systems have the greatest potential to improve motorcycle safety. Accumulating and encoding expertise in crash analysis from a range of disciplines into a scalable and reusable analytical tool, as proposed with the use of KBMS, has the potential to guide research and development of effective safety systems. As the expert assessment of the crash

  12. Potential difficulties in applying the Pay for Safety Scheme (PFSS) in construction projects.

    PubMed

    Choi, Tracy N Y; Chan, Daniel W M; Chan, Albert P C

    2012-09-01

    Since 1996, the Government of the Hong Kong Special Administrative Region (HKSAR) has introduced the Pay for Safety Scheme (PFSS) to the public works construction contracts to uplift their safety performance. However, the adoption of PFSS has also encountered some difficulties that merit considerable attention. This paper purports to provide a concise review of the prevailing application of PFSS in Hong Kong in general, and to explore the potential difficulties associated with PFSS in particular. By means of an empirical questionnaire survey geared towards industrial practitioners with extensive direct hands-on PFSS experience, their opinions were solicited, analyzed and compared between the client group and contractor group of respondents. The three most significant difficulties in implementing PFSS were found to be: (1) "Plenty of paperwork required for certifying payment to contractor"; (2) "Complicated contract documents and lengthy assessment process"; and (3) "Over-tight project schedule requiring rush jobs". The output of this research study is particularly essential in assisting the contracting parties to mitigate the avoidable hindrances when embarking on PFSS. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to PFSS success for future construction projects. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. ILSI Europe's Food Allergy Task Force: From Defining the Hazard to Assessing the Risk from Food Allergens.

    PubMed

    Crevel, René R W; Ronsmans, Stefan; Marsaux, Cyril F M; Bánáti, Diána

    2018-01-01

    The International Life Sciences Institute (ILSI) Europe Food Allergy Task Force was founded in response to early public concerns about the growing impact of food allergies almost coincidentally with the publication of the 1995 Food and Agriculture Organization-World Health Organization Technical Consultation on Food Allergies. In line with ILSI principles aimed to foster collaboration between stakeholders to promote consensus on science-based approaches to food safety and nutrition, the task force has played a central role since then in the development of risk assessment for food allergens. This ranged from consideration of the criteria to be applied to identifying allergens of public health concern through methodologies to determine the relationship between dose and the proportion of allergic individuals reacting, as well as the nature of the observed responses. The task force also promoted the application of novel, probabilistic risk assessment methods to better delineate the impact of benchmarks, such as reference doses, and actively participated in major European food allergy projects, such as EUROPREVALL, the European Union (EU)-funded project "The prevalence, cost and basis of food allergy across Europe;" and iFAAM, "Integrated approaches to food allergen and allergy risk management," also an EU-funded project. Over the years, the task force's work has evolved as answers to initial questions raised further issues: Its current work program includes a review of analytical methods and how different ones can best be deployed given their strengths and limitations. Another activity, which has just commenced, aims to develop a framework for stakeholders to achieve consensus on acceptable risk.

  14. Ad hoc versus standardized admixtures for continuous infusion drugs in neonatal intensive care: cognitive task analysis of safety at the bedside.

    PubMed

    Brannon, Timothy S

    2006-01-01

    Continuous infusion intravenous (IV) drugs in neonatal intensive care are usually prepared based on patient weight so that the dose is readable as a simple multiple of the infusion pump rate. New safety guidelines propose that hospitals switch to using standardized admixtures of these drugs to prevent calculation errors during ad hoc preparation. Extended hierarchical task analysis suggests that switching to standardized admixtures may lead to more errors in programming the pump at the bedside.

  15. Space Station crew safety alternatives study. Volume 5: Space Station safety plan

    NASA Technical Reports Server (NTRS)

    Mead, G. H.; Peercy, R. L., Jr.; Raasch, R. F.

    1985-01-01

    The Space Station Safety Plan has been prepared as an adjunct to the subject contract final report, suggesting the tasks and implementation procedures to ensure that threats are addressed and resolution strategy options identified and incorporated into the space station program. The safety program's approach is to realize minimum risk exposure without levying undue design and operational constraints. Safety objectives and risk acceptances are discussed.

  16. United States Coast Guard Configuration Management Plan (CMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...

  17. Safety-oriented usability test of a semi-automated unit dose system: role of task allocation between human and machine.

    PubMed

    Pelayo, Sylvia; Hassler, Sylvain; Bernonville, Stéphanie; Aldegheri, Julien; Beuscart-Zephir, Marie-Catherine

    2013-01-01

    The distribution of tasks between humans and machines in the design of healthcare systems is an important issue for patient safety. This paper presents a usability test performed to compare a semi-automated unit dose system (UDS) with the usual/manual preparation procedure for preparing and administering drugs. The results show that the UDS prevents the frequent administration errors encountered with the usual cabinets and produces a better performance in terms of time for filling the pill dispensers (6.52 sec ± 1.1 vs. 8.5 sec ± 1.5 (t(9, 16) = 3.12, p <.007)). But the results also stress that the UDS takes entire control of the preparation and administration tasks, thus leading to a loss of control of the process by nurses (difficulties experienced by them in resuming their actions, difficulties in memorizing drugs, lack of confidence in the UDS while they "blindly" rely on it). The distribution of tasks between the nurses and the UDS should be modified to give back control to the nurses. Design suggestions were provided in this way. For instance, the UDS may guide the nurses for the drugs localization in the cabinet but leaves the validation of the drugs to the nurses.

  18. Assessing drivers' response during automated driver support system failures with non-driving tasks.

    PubMed

    Shen, Sijun; Neyens, David M

    2017-06-01

    With the increase in automated driver support systems, drivers are shifting from operating their vehicles to supervising their automation. As a result, it is important to understand how drivers interact with these automated systems and evaluate their effect on driver responses to safety critical events. This study aimed to identify how drivers responded when experiencing a safety critical event in automated vehicles while also engaged in non-driving tasks. In total 48 participants were included in this driving simulator study with two levels of automated driving: (a) driving with no automation and (b) driving with adaptive cruise control (ACC) and lane keeping (LK) systems engaged; and also two levels of a non-driving task (a) watching a movie or (b) no non-driving task. In addition to driving performance measures, non-driving task performance and the mean glance duration for the non-driving task were compared between the two levels of automated driving. Drivers using the automated systems responded worse than those manually driving in terms of reaction time, lane departure duration, and maximum steering wheel angle to an induced lane departure event. These results also found that non-driving tasks further impaired driver responses to a safety critical event in the automated system condition. In the automated driving condition, driver responses to the safety critical events were slower, especially when engaged in a non-driving task. Traditional driver performance variables may not necessarily effectively and accurately evaluate driver responses to events when supervising autonomous vehicle systems. Thus, it is important to develop and use appropriate variables to quantify drivers' performance under these conditions. Copyright © 2017 Elsevier Ltd and National Safety Council. All rights reserved.

  19. Ad Hoc versus Standardized Admixtures for Continuous Infusion Drugs in Neonatal Intensive Care: Cognitive Task Analysis of Safety at the Bedside

    PubMed Central

    Brannon, Timothy S.

    2006-01-01

    Continuous infusion intravenous (IV) drugs in neonatal intensive care are usually prepared based on patient weight so that the dose is readable as a simple multiple of the infusion pump rate. New safety guidelines propose that hospitals switch to using standardized admixtures of these drugs to prevent calculation errors during ad hoc preparation. Extended hierarchical task analysis suggests that switching to standardized admixtures may lead to more errors in programming the pump at the bedside. PMID:17238482

  20. The roles and functions of safety professionals in Taiwan: Comparing the perceptions of safety professionals and safety educators.

    PubMed

    Wu, Tsung-Chih

    2011-10-01

    The perspectives of both internal and external members have to be considered when developing safety curricula. This study discusses perceptional differences between safety educators (SEs) and safety professionals (SPs) regarding the function of SPs. The findings will serve as a reference framework for the establishment of core safety competencies and the development of safety curricula for SPs. 248 respondents, including both SEs and SPs, completed self-administered questionnaires, which included the 45-item safety function scale (SFS). Nine factors were extracted from the scale using exploratory factor analysis (EFA), namely inspection and research, regulatory tasks, emergency procedures and settlement of damage, management and financial affairs, culture change, problem identification and analysis, developing and implementing solutions, knowledge management, and training and communications. Descriptive statistical results indicated that SPs and SEs hold differing views on the rank of the frequency of safety functions. MANOVA results indicated that SPs' perceptions of developing and implementing solutions, training and communications, inspection and research, and management and financial affairs were significantly higher than that of SEs. On the other hand, SE's perceptions regarding participation in regulatory tasks were significantly higher than those of SPs. Based on these results, the author suggests that a clear communication channel should be established between universities and industry to reduce the gap between the perceptions of SEs and SPs. The results of the study are statistically and practically significant. In addition to serving as a reference for the development of safety curricula, the results are also conducive to the establishment of SP roles and functions. Ultimately the development of more suitable safety curricula would open up employment competition for students who graduate from safety-related programs. SPs, on the other hand, can correctly

  1. Optimization of safety on pavement preservation projects.

    DOT National Transportation Integrated Search

    2011-01-01

    To achieve a goal of reducing highway crash fatalities by 4% each year to improve roadway safety, the Georgia Department of Transportation (GDOT) is actively seeking opportunities to incorporate safety improvements into its current pavement preservat...

  2. Concurrent processing of vehicle lane keeping and speech comprehension tasks.

    PubMed

    Cao, Shi; Liu, Yili

    2013-10-01

    With the growing prevalence of using in-vehicle devices and mobile devices while driving, a major concern is their impact on driving performance and safety. However, the effects of cognitive load such as conversation on driving performance are still controversial and not well understood. In this study, an experiment was conducted to investigate the concurrent performance of vehicle lane keeping and speech comprehension tasks with improved experimental control of the confounding factors identified in previous studies. The results showed that the standard deviation of lane position (SDLP) was increased when the driving speed was faster (0.30 m at 36 km/h; 0.36 m at 72 km/h). The concurrent comprehension task had no significant effect on SDLP (0.34 m on average) or the standard deviation of steering wheel angle (SDSWA; 5.20° on average). The correct rate of the comprehension task was reduced in the dual-task condition (from 93.4% to 91.3%) compared with the comprehension single-task condition. Mental workload was significantly higher in the dual-task condition compared with the single-task conditions. Implications for driving safety were discussed. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    PubMed

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. An integrated quality function deployment and capital budgeting methodology for occupational safety and health as a systems thinking approach: the case of the construction industry.

    PubMed

    Bas, Esra

    2014-07-01

    In this paper, an integrated methodology for Quality Function Deployment (QFD) and a 0-1 knapsack model is proposed for occupational safety and health as a systems thinking approach. The House of Quality (HoQ) in QFD methodology is a systematic tool to consider the inter-relationships between two factors. In this paper, three HoQs are used to consider the interrelationships between tasks and hazards, hazards and events, and events and preventive/protective measures. The final priority weights of events are defined by considering their project-specific preliminary weights, probability of occurrence, and effects on the victim and the company. The priority weights of the preventive/protective measures obtained in the last HoQ are fed into a 0-1 knapsack model for the investment decision. Then, the selected preventive/protective measures can be adapted to the task design. The proposed step-by-step methodology can be applied to any stage of a project to design the workplace for occupational safety and health, and continuous improvement for safety is endorsed by the closed loop characteristic of the integrated methodology. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. Simulation Of Research And Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, Ralph F.

    1987-01-01

    Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

  6. Contributions of the SDR Task Network tool to Calibration and Validation of the NPOESS Preparatory Project instruments

    NASA Astrophysics Data System (ADS)

    Feeley, J.; Zajic, J.; Metcalf, A.; Baucom, T.

    2009-12-01

    The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) Calibration and Validation (Cal/Val) team is planning post-launch activities to calibrate the NPP sensors and validate Sensor Data Records (SDRs). The IPO has developed a web-based data collection and visualization tool in order to effectively collect, coordinate, and manage the calibration and validation tasks for the OMPS, ATMS, CrIS, and VIIRS instruments. This tool is accessible to the multi-institutional Cal/Val teams consisting of the Prime Contractor and Government Cal/Val leads along with the NASA NPP Mission team, and is used for mission planning and identification/resolution of conflicts between sensor activities. Visualization techniques aid in displaying task dependencies, including prerequisites and exit criteria, allowing for the identification of a critical path. This presentation will highlight how the information is collected, displayed, and used to coordinate the diverse instrument calibration/validation teams.

  7. Task Analysis for Legal Assistant Program. Final Report.

    ERIC Educational Resources Information Center

    Schrader, Marvin A.; Knight, John

    The Legal Assistant Task Analysis Project was undertaken to provide data related to the importance of tasks and the frequency of tasks that are, or could be, assigned to an assistant. In order to accomplish this, a task survey form was constructed and distributed to a sample of attorneys in (1) private practice, (2) companies or corporations, and…

  8. [The Polish Task Force position statement on safety of biologic treatment with monoclonal antibodies and soluble receptors].

    PubMed

    Jahnz-Rozyk, Karina; Wiesik-Szewczyk, Ewa

    2014-07-01

    The introduction of biologic therapies for treatment in many fields of medicine such as rheumatology oncology, dermatology, hematology and allergology, became one of the most important achievements of the modem medicine. The first biological therapeutics have already reached patent expiration date and corresponding biosimilars were approved by EMA (European Medicine Agency) and FDA (Food and Drug Administration). Many more biosimilar products are currently under review for marketing authorization around the world. The approval of products similar, but not identical to already known innovative biologics, due to complexity of structure and manufacturing technology, stirs a lot of discussions regarding safety concerns related to differences in posttranslational processing and in immunogenicity between reference and biosimilar products, and relevance of these differences to the clinical practice. Critical issues involve extrapolation to different clinical indication, automatic substitution and switching. Despite EMA recommendation and advocacy for biosimilars, it is beyond this regulatory authority to establish definitive regulation for each EU member, which it is expected to be country related. The aim of the study was an attempt to define the stance regarding particular aspects of biological treatment conducted in Poland is undertaken. The Task Force of 13 experts involved in various aspects of biologic therapies in Poland was established. A modified Delphi voting was performed to achieve consensus regarding the most important aspects of biologic treatment in Poland, with particular concern of biosimilars. Ten final statements were discussed and voted upon. The statements cover general aspects of biosimilars including expected cost-benefit ratios, extrapolation of clinical indications, interchange switching, patient information and requirement of patient consent. The state of post marketing pharmacovigilance of biologics (innovative ones as well as biosimilars) was

  9. 33 CFR 165.T13-149 - Safety Zone; McNary-John Day Transmission Line Project, Columbia River, Hermiston, OR.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Transmission Line Project, Columbia River, Hermiston, OR. 165.T13-149 Section 165.T13-149 Navigation and... Project, Columbia River, Hermiston, OR. (a) Location: The following is a safety zone: All waters of the Columbia River between two lines with the first line starting at the north bank at 45° 56′ 16.5″ N/119° 19...

  10. Applied Cognitive Task Analysis (ACTA) Methodology

    DTIC Science & Technology

    1997-11-01

    experienced based cognitive skills. The primary goal of this project was to develop streamlined methods of Cognitive Task Analysis that would fill this need...We have made important progression this direction. We have developed streamlined methods of Cognitive Task Analysis . Our evaluation study indicates...developed a CD-based stand alone instructional package, which will make the Applied Cognitive Task Analysis (ACTA) tools widely accessible. A survey of the

  11. The procedure safety system

    NASA Technical Reports Server (NTRS)

    Obrien, Maureen E.

    1990-01-01

    Telerobotic operations, whether under autonomous or teleoperated control, require a much more sophisticated safety system than that needed for most industrial applications. Industrial robots generally perform very repetitive tasks in a controlled, static environment. The safety system in that case can be as simple as shutting down the robot if a human enters the work area, or even simply building a cage around the work space. Telerobotic operations, however, will take place in a dynamic, sometimes unpredictable environment, and will involve complicated and perhaps unrehearsed manipulations. This creates a much greater potential for damage to the robot or objects in its vicinity. The Procedural Safety System (PSS) collects data from external sensors and the robot, then processes it through an expert system shell to determine whether an unsafe condition or potential unsafe condition exists. Unsafe conditions could include exceeding velocity, acceleration, torque, or joint limits, imminent collision, exceeding temperature limits, and robot or sensor component failure. If a threat to safety exists, the operator is warned. If the threat is serious enough, the robot is halted. The PSS, therefore, uses expert system technology to enhance safety thus reducing operator work load, allowing him/her to focus on performing the task at hand without the distraction of worrying about violating safety criteria.

  12. 75 FR 53701 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0394] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01); Correction AGENCY: Food and Drug Administration, HHS. ACTION: Notice; correction. SUMMARY: The Food and Drug...

  13. A system safety model for developmental aircraft programs

    NASA Technical Reports Server (NTRS)

    Amberboy, E. J.; Stokeld, R. L.

    1982-01-01

    Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.

  14. Priming patient safety: A middle-range theory of safety goal priming via safety culture communication.

    PubMed

    Groves, Patricia S; Bunch, Jacinda L

    2018-05-18

    The aim of this paper is discussion of a new middle-range theory of patient safety goal priming via safety culture communication. Bedside nurses are key to safe care, but there is little theory about how organizations can influence nursing behavior through safety culture to improve patient safety outcomes. We theorize patient safety goal priming via safety culture communication may support organizations in this endeavor. According to this theory, hospital safety culture communication activates a previously held patient safety goal and increases the perceived value of actions nurses can take to achieve that goal. Nurses subsequently prioritize and are motivated to perform tasks and risk assessment related to achieving patient safety. These efforts continue until nurses mitigate or ameliorate identified risks and hazards during the patient care encounter. Critically, this process requires nurses to have a previously held safety goal associated with a repertoire of appropriate actions. This theory suggests undergraduate educators should foster an outcomes focus emphasizing the connections between nursing interventions and safety outcomes, hospitals should strategically structure patient safety primes into communicative activities, and organizations should support professional development including new skills and the latest evidence supporting nursing practice for patient safety. © 2018 John Wiley & Sons Ltd.

  15. 75 FR 72863 - Motor Carrier Safety Advisory Committee Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... MCSAC will complete action on Task 10-02, regarding Fatigue Management Plans for Commercial Motor Vehicle Drivers. Additionally, the MCSAC will commence work on Task 11-01, regarding Patterns of Safety... officer, safety director, vehicle maintenance supervisor, and driver supervisor of a motor carrier...

  16. 77 FR 46764 - Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0011] Clinical Studies of Safety and Effectiveness of Orphan Products Research Project Grant (R01) AGENCY: Food... orphan products. Orphan products are drugs, biologics, medical devices, and medical foods that are...

  17. Learning Incoherent Sparse and Low-Rank Patterns from Multiple Tasks

    PubMed Central

    Chen, Jianhui; Liu, Ji; Ye, Jieping

    2013-01-01

    We consider the problem of learning incoherent sparse and low-rank patterns from multiple tasks. Our approach is based on a linear multi-task learning formulation, in which the sparse and low-rank patterns are induced by a cardinality regularization term and a low-rank constraint, respectively. This formulation is non-convex; we convert it into its convex surrogate, which can be routinely solved via semidefinite programming for small-size problems. We propose to employ the general projected gradient scheme to efficiently solve such a convex surrogate; however, in the optimization formulation, the objective function is non-differentiable and the feasible domain is non-trivial. We present the procedures for computing the projected gradient and ensuring the global convergence of the projected gradient scheme. The computation of projected gradient involves a constrained optimization problem; we show that the optimal solution to such a problem can be obtained via solving an unconstrained optimization subproblem and an Euclidean projection subproblem. We also present two projected gradient algorithms and analyze their rates of convergence in details. In addition, we illustrate the use of the presented projected gradient algorithms for the proposed multi-task learning formulation using the least squares loss. Experimental results on a collection of real-world data sets demonstrate the effectiveness of the proposed multi-task learning formulation and the efficiency of the proposed projected gradient algorithms. PMID:24077658

  18. Learning Incoherent Sparse and Low-Rank Patterns from Multiple Tasks.

    PubMed

    Chen, Jianhui; Liu, Ji; Ye, Jieping

    2012-02-01

    We consider the problem of learning incoherent sparse and low-rank patterns from multiple tasks. Our approach is based on a linear multi-task learning formulation, in which the sparse and low-rank patterns are induced by a cardinality regularization term and a low-rank constraint, respectively. This formulation is non-convex; we convert it into its convex surrogate, which can be routinely solved via semidefinite programming for small-size problems. We propose to employ the general projected gradient scheme to efficiently solve such a convex surrogate; however, in the optimization formulation, the objective function is non-differentiable and the feasible domain is non-trivial. We present the procedures for computing the projected gradient and ensuring the global convergence of the projected gradient scheme. The computation of projected gradient involves a constrained optimization problem; we show that the optimal solution to such a problem can be obtained via solving an unconstrained optimization subproblem and an Euclidean projection subproblem. We also present two projected gradient algorithms and analyze their rates of convergence in details. In addition, we illustrate the use of the presented projected gradient algorithms for the proposed multi-task learning formulation using the least squares loss. Experimental results on a collection of real-world data sets demonstrate the effectiveness of the proposed multi-task learning formulation and the efficiency of the proposed projected gradient algorithms.

  19. Professional Preparation for Careers in Safety.

    ERIC Educational Resources Information Center

    Della-Giustina, Daniel

    There has been a long existing need for individuals with extensive training and concentration in safety studies. The foundation areas upon which a curriculum for training safety practitioners is based should include: (1) trends in accident prevention and control; (2) safety analysis of human and machine tasks; (3) hazard identification and control…

  20. Drinking-driving attitudes : a comparison of the first two household surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1974-01-01

    This report provides an analysis of the community response to the public information countermeasure of the Fairfax Alcohol Safety Action Project, one thrust of a national effort to get the drunken driver off the highway. A series of in-depth househol...

  1. System Safety in Aircraft Acquisition

    DTIC Science & Technology

    1984-01-01

    Relationship Between JSSC and SOHP ..... .......... 6- 1 Some Similarities in the Departments’ Approaches to System Safety... RELATIONSHIP BETWEEN JSSC AND SOHP The annual JSSC sponsored by the safety centers coordinates safety activities. It was described recently as "an unchartered...developed an excellent working relationship . Re- presentatives from SOHP can and do influence tasks undertaken by JSSC. Con- versely, SOUP is the one

  2. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giordano, Anthony P.

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  3. Safety-critical event risk associated with cell phone tasks as measured in naturalistic driving studies: A systematic review and meta-analysis.

    PubMed

    Simmons, Sarah M; Hicks, Anne; Caird, Jeff K

    2016-02-01

    A systematic review and meta-analysis of naturalistic driving studies involving estimates of safety-critical event risk associated with handheld device use while driving is described. Fifty-seven studies identified from targeted databases, journals and websites were reviewed in depth, and six were ultimately included. These six studies, published between 2006 and 2014, encompass seven sets of naturalistic driver data and describe original research that utilized naturalistic methods to assess the effects of distracting behaviors. Four studies involved non-commercial drivers of light vehicles and two studies involved commercial drivers of trucks and buses. Odds ratios quantifying safety-critical event (SCE) risk associated with talking, dialing, locating or answering, and texting or browsing were extracted. Stratified meta-analysis of pooled odds ratios was used to estimate SCE risk by distraction type; meta-regression was used to test for sources of heterogeneity. The results indicate that tasks that require drivers to take their eyes off the road, such as dialing, locating a phone and texting, increase SCE risk to a greater extent than tasks that do not require eyes off the road such as talking. Although talking on a handheld device did not increase SCE risk, further research is required to determine whether it indirectly influences SCE risk (e.g., by encouraging other cell phone activities). In addition, a number of study biases and quality issues of naturalistic driving studies are discussed. Copyright © 2015 Elsevier Ltd. All rights reserved.

  4. The impact of occupational health and safety regulations on prevention through design in construction projects: Perspectives from Spain and the United Kingdom.

    PubMed

    Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair

    2015-01-01

    Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.

  5. Inventory of Federal energy-related environment and safety research for FY 1979. Volume II. Project listings and indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed bymore » subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.« less

  6. The K-8 Aeronautics Internet Testbook: Project Plan-Year 3

    NASA Technical Reports Server (NTRS)

    Pallis, Jani Macari

    1997-01-01

    The Project Plan - Year 3 includes: the major tasks and milestones, the assignment of tasks, and the key personnel assigned to each task, a description of the milestone and major task, and the deliverables for the project. Milestones have project numbers ending in "0.0", such as "25.0.0 Phase III Development". Major tasks under that milestone begin with the same first number such as, "25.0.1 Develop Future Of Aeronautics". The assignment of tasks included in the Year 3 project plan contains the names of the key personnel responsible for the task and others participating on the task. Although the PI has the overall and ultimately responsible for all the tasks and milestones, the name of the first individual on a task or milestone is the person responsible for that task. Other names listed under that task will be participating on the task. Since there are two individuals at Cislunar Aerospace, Inc. with the name "J. Pallis", the principal investigator, Jani Macari Pallis is designated as PI in the Project Plan and James Pallis is designated as J. Pallis.

  7. Technology Development for Fire Safety in Exploration Spacecraft and Habitats

    NASA Technical Reports Server (NTRS)

    Ruff, Gary A.; Urban, David L.

    2007-01-01

    Fire during an exploration mission far from Earth is a particularly critical risk for exploration vehicles and habitats. The Fire Prevention, Detection, and Suppression (FPDS) project is part of the Exploration Technology Development Program (ETDP) and has the goal to enhance crew health and safety on exploration missions by reducing the likelihood of a fire, or, if one does occur, minimizing the risk to the mission, crew, or system. Within the past year, the FPDS project has been formalized within the ETDP structure and has seen significant progress on its tasks in fire prevention, detection, and suppression. As requirements for Constellation vehicles and, specifically, the CEV have developed, the need for the FPDS technologies has become more apparent and we continue to make strides to infuse them into the Constellation architecture. This paper describes the current structure of the project within the ETDP and summarizes the significant programmatic activities. Major technical accomplishments are identified as are activities planned for FY07.

  8. Technology Development for Fire Safety in Exploration Spacecraft and Habitats

    NASA Technical Reports Server (NTRS)

    Ruff, Gary A.; Urban, David L.

    2006-01-01

    Fire during an exploration mission far from Earth is a particularly critical risk for exploration vehicles and habitats. The Fire Prevention, Detection, and Suppression (FPDS) project is part of the Exploration Technology Development Program (ETDP) and has the goal to enhance crew health and safety on exploration missions by reducing the likelihood of a fire, or, if one does occur, minimizing the risk to the mission, crew, or system. Within the past year, the FPDS project has been formalized within the ETDP structure and has seen significant progress on its tasks in fire prevention, detection, and suppression. As requirements for Constellation vehicles and, specifically, the CEV have developed, the need for the FPDS technologies has become more apparent and we continue to make strides to infuse them into the Constellation architecture. This paper describes the current structure of the project within the ETDP and summarizes the significant programmatic activities. Major technical accomplishments are identified as are activities planned for FY07.

  9. Students' Views of Example Generation Tasks

    ERIC Educational Resources Information Center

    Breen, Sinead; O'Shea, Ann; Pfeiffer, Kirsten

    2016-01-01

    We report here on students' views of example generation tasks assigned to them in two first year undergraduate Calculus courses. The design and use of such tasks was undertaken as part of a project which aimed to afford students opportunities to develop their thinking skills and their conceptual understanding. In interviews with 10 students, we…

  10. Near-Zero Emissions Oxy-Combustion Flue Gas Purification Task 2: SOx/Nox/Hg Removal for High Sulfur Coal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nick Degenstein; Minish Shah; Doughlas Louie

    2012-05-01

    The goal of this project is to develop a near-zero emissions flue gas purification technology for existing PC (pulverized coal) power plants that are retrofitted with oxy-combustion technology. The objective of Task 2 of this project was to evaluate an alternative method of SOx, NOx and Hg removal from flue gas produced by burning high sulfur coal in oxy-combustion power plants. The goal of the program was not only to investigate a new method of flue gas purification but also to produce useful acid byproduct streams as an alternative to using a traditional FGD and SCR for flue gas processing.more » During the project two main constraints were identified that limit the ability of the process to achieve project goals. 1) Due to boiler island corrosion issues >60% of the sulfur must be removed in the boiler island with the use of an FGD. 2) A suitable method could not be found to remove NOx from the concentrated sulfuric acid product, which limits sale-ability of the acid, as well as the NOx removal efficiency of the process. Given the complexity and safety issues inherent in the cycle it is concluded that the acid product would not be directly saleable and, in this case, other flue gas purification schemes are better suited for SOx/NOx/Hg control when burning high sulfur coal, e.g. this project's Task 3 process or a traditional FGD and SCR.« less

  11. Understanding the relationship between safety investment and safety performance of construction projects through agent-based modeling.

    PubMed

    Lu, Miaojia; Cheung, Clara Man; Li, Heng; Hsu, Shu-Chien

    2016-09-01

    The construction industry in Hong Kong increased its safety investment by 300% in the past two decades; however, its accident rate has plateaued to around 50% for one decade. Against this backdrop, researchers have found inconclusive results on the causal relationship between safety investment and safety performance. Using agent-based modeling, this study takes an unconventional bottom-up approach to study safety performance on a construction site as an outcome of a complex system defined by interactions among a worksite, individual construction workers, and different safety investments. Instead of focusing on finding the absolute relationship between safety investment and safety performance, this study contributes to providing a practical framework to investigate how different safety investments interacting with different parameters such as human and environmental factors could affect safety performance. As a result, we could identify cost-effective safety investments under different construction scenarios for delivering optimal safety performance. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Inventory of Federal energy-related environment and safety research for FY 1978. Volume II. Project listings and indexes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-12-01

    This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level ifmore » known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.« less

  13. The collection of national trend data on alcohol related crashes for comparison with alcohol safety action projects results. Volume 2, ASAP control site data

    DOT National Transportation Integrated Search

    1977-07-01

    As a result of evaluations of the Alcohol Safety Action Projects (ASAP), a requirement was generated by the National Highway Traffic Safety Administration (NHTSA) for the development of a data base of alcohol-related accidents in communities with no ...

  14. Integrating gender medicine into the workplace health and safety policy in the scientific research institutions: a mandatory task.

    PubMed

    Giammarioli, Anna Maria; Siracusano, Alessandra; Sorrentino, Eugenio; Bettoni, Monica; Malorni, Walter

    2012-01-01

    Gender medicine is a multi-faceted field of investigation integrating various aspects of psycho-social and biological sciences but it mainly deals with the impact of the gender on human physiology, pathophysiology, and clinical features of diseases. In Italy, the Decree Law 81/2008 recently introduced the gender issue in the risk assessment at the workplaces. This review briefly describes our current knowledge on gender medicine and on the Italian legislation in risk management. Public or private scientific institutions should be the first to pay attention to the safety of their workers, who are simultaneously subjected to biological, chemical and physical agents. Main tasks of risk management in scientific research institutions are here analyzed and discussed in a gender perspective.

  15. Safety margins in older adults increase with improved control of a dynamic object

    PubMed Central

    Hasson, Christopher J.; Sternad, Dagmar

    2014-01-01

    Older adults face decreasing motor capabilities due to pervasive neuromuscular degradations. As a consequence, errors in movement control increase. Thus, older individuals should maintain larger safety margins than younger adults. While this has been shown for object manipulation tasks, several reports on whole-body activities, such as posture and locomotion, demonstrate age-related reductions in safety margins. This is despite increased costs for control errors, such as a fall. We posit that this paradox could be explained by the dynamic challenge presented by the body or also an external object, and that age-related reductions in safety margins are in part due to a decreased ability to control dynamics. To test this conjecture we used a virtual ball-in-cup task that had challenging dynamics, yet afforded an explicit rendering of the physics and safety margin. The hypotheses were: (1) When manipulating an object with challenging dynamics, older adults have smaller safety margins than younger adults. (2) Older adults increase their safety margins with practice. Nine young and 10 healthy older adults practiced moving the virtual ball-in-cup to a target location in exactly 2 s. The accuracy and precision of the timing error quantified skill, and the ball energy relative to an escape threshold quantified the safety margin. Compared to the young adults, older adults had increased timing errors, greater variability, and decreased safety margins. With practice, both young and older adults improved their ability to control the object with decreased timing errors and variability, and increased their safety margins. These results suggest that safety margins are related to the ability to control dynamics, and may explain why in tasks with simple dynamics older adults use adequate safety margins, but in more complex tasks, safety margins may be inadequate. Further, the results indicate that task-specific training may improve safety margins in older adults. PMID:25071566

  16. Geospace Plasma Dynamics Laboratory Annual Task Report (FY11)

    DTIC Science & Technology

    2012-03-01

    Site Contractors: Nagendra Singh, Ph.D., Physicist , 0.5 MY Neil Grossbard, M.S., Mathematician , 0.7 MY Visitors: Publications: Articles in...PhD Project Manager Division Chief, RVB This report is published in the interest of scientific and technical...Annual Task Report (FY11) 5c. PROGRAM ELEMENT NUMBER 61102F 6. AUTHOR(S) 5d. PROJECT NUMBER 2311 Daniel Ober 5e. TASK NUMBER

  17. Roadway safety design workbook.

    DOT National Transportation Integrated Search

    2009-07-01

    Highway safety is an ongoing concern to the Texas Department of Transportation (TxDOT). As part of its : proactive commitment to improving highway safety, TxDOT is moving toward including quantitative safety : analyses earlier in the project developm...

  18. Highway safety design workshops.

    DOT National Transportation Integrated Search

    2010-11-01

    Highway safety is an ongoing concern for the Texas Department of Transportation (TxDOT). As part of its : proactive commitment to improving highway safety, TxDOT is moving toward including quantitative safety : analyses earlier in the project develop...

  19. Federal motor carrier safety administration safety 2010 strategy and performance planning : project description

    DOT National Transportation Integrated Search

    2000-12-01

    The Motor Carrier Safety Improvement Act (MCSIA) of 1999, Pub. L. 106-159, created the Federal Motor Carrier Safety Administration (FMCSA) in January 2000. Section 104 of the Act requires the Secretary to develop a long-term strategy for improving co...

  20. Task conflict and team creativity: a question of how much and when.

    PubMed

    Farh, Jiing-Lih; Lee, Cynthia; Farh, Crystal I C

    2010-11-01

    Bridging the task conflict, team creativity, and project team development literatures, we present a contingency model in which the relationship between task conflict and team creativity depends on the level of conflict and when it occurs in the life cycle of a project team. In a study of 71 information technology project teams in the greater China region, we found that task conflict had a curvilinear effect on team creativity, such that creativity was highest at moderate levels of task conflict. Additionally, we found this relationship to be moderated by team phase, such that the curvilinear effect was strongest at an early phase. In contrast, at later phases of the team life cycle, task conflict was found to be unrelated to team creativity. (c) 2010 APA, all rights reserved.

  1. Software Safety Risk in Legacy Safety-Critical Computer Systems

    NASA Technical Reports Server (NTRS)

    Hill, Janice L.; Baggs, Rhoda

    2007-01-01

    Safety Standards contain technical and process-oriented safety requirements. Technical requirements are those such as "must work" and "must not work" functions in the system. Process-Oriented requirements are software engineering and safety management process requirements. Address the system perspective and some cover just software in the system > NASA-STD-8719.13B Software Safety Standard is the current standard of interest. NASA programs/projects will have their own set of safety requirements derived from the standard. Safety Cases: a) Documented demonstration that a system complies with the specified safety requirements. b) Evidence is gathered on the integrity of the system and put forward as an argued case. [Gardener (ed.)] c) Problems occur when trying to meet safety standards, and thus make retrospective safety cases, in legacy safety-critical computer systems.

  2. Safety of novel projects, the battle against Murphy's law.

    PubMed

    Schmidt, R

    2001-01-01

    With great pleasure and respect I have accepted the offer to speak in this congress. Medicine was a dream for me sometime ago and my second choice for studies. I remained with my first choice engineering and I am still happy with it; but I never forgot my love and enthusiasm for medicine. My career brought me in contact with many countries and technologies, but the development towards safety management became a dominant trend. At CERN I am a Group Leader in Matters of Safety for the Compact Muon Solenoid (CMS) experiment. In the last few years my attention has been increasingly focused on human and institutional safety aspects, besides the technical ones. My paper deals with three major topics: Safety management at CERN-CMS Murphy's law and the growing importance of institutional and human factors in safety Future outlook for safety and conclusions. In the conclusions the commonalities between different technologies become more evident as the importance of the human nature and man's role and enticement to actively and intelligently contribute to safety are presented. Based on experience and references an appeal is launched to pay more attention to the human factor in safety and recognize the rules and regularities of human behaviour in order to better combat Murphy's law.

  3. Convolutional neural networks and face recognition task

    NASA Astrophysics Data System (ADS)

    Sochenkova, A.; Sochenkov, I.; Makovetskii, A.; Vokhmintsev, A.; Melnikov, A.

    2017-09-01

    Computer vision tasks are remaining very important for the last couple of years. One of the most complicated problems in computer vision is face recognition that could be used in security systems to provide safety and to identify person among the others. There is a variety of different approaches to solve this task, but there is still no universal solution that would give adequate results in some cases. Current paper presents following approach. Firstly, we extract an area containing face, then we use Canny edge detector. On the next stage we use convolutional neural networks (CNN) to finally solve face recognition and person identification task.

  4. Dual tasking negatively impacts obstacle avoidance abilities in post-stroke individuals with visuospatial neglect: Task complexity matters!

    PubMed

    Aravind, Gayatri; Lamontagne, Anouk

    2017-01-01

    Persons with perceptual-attentional deficits due to visuospatial neglect (VSN) after a stroke are at a risk of collisions while walking in the presence of moving obstacles. The attentional burden of performing a dual-task may further compromise their obstacle avoidance performance, putting them at a greater risk of collisions. The objective of this study was to compare the ability of persons with (VSN+) and without VSN (VSN-) to dual task while negotiating moving obstacles. Twenty-six stroke survivors (13 VSN+, 13 VSN-) were assessed on their ability to (a) negotiate moving obstacles while walking (locomotor single task); (b) perform a pitch-discrimination task (cognitive single task) and (c) simultaneously perform the walking and cognitive tasks (dual task). We compared the groups on locomotor (collision rates, minimum distance from obstacle and onset of strategies) and cognitive (error rates) outcomes. For both single and dual task walking, VSN+ individuals showed higher collision rates compared to VSN- individuals. Dual tasking caused deterioration of locomotor (more collisions, delayed onset and smaller minimum distances) and cognitive performances (higher error rate) in VSN+ individuals. Contrastingly, VSN- individuals maintained collision rates, increased minimum distance, but showed more cognitive errors, prioritizing their locomotor performance. Individuals with VSN demonstrate cognitive-locomotor interference under dual task conditions, which could severely compromise safety when ambulating in community environments and may explain the poor recovery of independent community ambulation in these individuals.

  5. Space-Based Telemetry and Range Safety Project Ku-Band and Ka-Band Phased Array Antenna

    NASA Technical Reports Server (NTRS)

    Whiteman, Donald E.; Valencia, Lisa M.; Birr, Richard B.

    2005-01-01

    The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

  6. Human factors evaluation of remote afterloading brachytherapy. Volume 2, Function and task analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callan, J.R.; Gwynne, J.W. III; Kelly, T.T.

    1995-05-01

    A human factors project on the use of nuclear by-product material to treat cancer using remotely operated afterloaders was undertaken by the Nuclear Regulatory Commission. The purpose of the project was to identify factors that contribute to human error in the system for remote afterloading brachytherapy (RAB). This report documents the findings from the first phase of the project, which involved an extensive function and task analysis of RAB. This analysis identified the functions and tasks in RAB, made preliminary estimates of the likelihood of human error in each task, and determined the skills needed to perform each RAB task.more » The findings of the function and task analysis served as the foundation for the remainder of the project, which evaluated four major aspects of the RAB system linked to human error: human-system interfaces; procedures and practices; training and qualifications of RAB staff; and organizational practices and policies. At its completion, the project identified and prioritized areas for recommended NRC and industry attention based on all of the evaluations and analyses.« less

  7. Compendium of Traffic Safety Research Projects 1985-2013.

    DOT National Transportation Integrated Search

    2014-01-01

    Through many name changes, from the Office of Program Development and Evaluation, the Office of Research and Evaluation, to the current, Office of Behavioral Safety Research, our focus has remained on improving the safety of drivers, occupants, pedes...

  8. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    NASA Technical Reports Server (NTRS)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  9. LNG safety assessment evaluation methods : task 3 letter report.

    DOT National Transportation Integrated Search

    2016-07-01

    Sandia National Laboratories evaluated published safety assessment methods across a variety of industries including Liquefied Natural Gas (LNG), hydrogen, land and marine transportation, as well as the US Department of Defense (DOD). All the methods ...

  10. Robotics/Automated Systems Task Analysis and Description of Required Job Competencies Report. Task Analysis and Description of Required Job Competencies of Robotics/Automated Systems Technicians.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    This task analysis report for the Robotics/Automated Systems Technician (RAST) curriculum project first provides a RAST job description. It then discusses the task analysis, including the identification of tasks, the grouping of tasks according to major areas of specialty, and the comparison of the competencies to existing or new courses to…

  11. Report of NASA Lunar Energy Enterprise Case Study Task Force

    NASA Technical Reports Server (NTRS)

    Kearney, John J.

    1989-01-01

    The Lunar Energy Enterprise Case Study Task Force was asked to determine the economic viability and commercial potential of mining and extracting He-3 from the lunar soil, and transporting the material to Earth for use in a power-generating fusion reactor. Two other space energy projects, the Space Power Station (SPS) and the Lunar Power Station (LPS), were also reviewed because of several interrelated aspects of these projects. The specific findings of the Task Force are presented. Appendices contain related papers generated by individual Task Force Members.

  12. Task-based optimization of image reconstruction in breast CT

    NASA Astrophysics Data System (ADS)

    Sanchez, Adrian A.; Sidky, Emil Y.; Pan, Xiaochuan

    2014-03-01

    We demonstrate a task-based assessment of image quality in dedicated breast CT in order to optimize the number of projection views acquired. The methodology we employ is based on the Hotelling Observer (HO) and its associated metrics. We consider two tasks: the Rayleigh task of discerning between two resolvable objects and a single larger object, and the signal detection task of classifying an image as belonging to either a signalpresent or signal-absent hypothesis. HO SNR values are computed for 50, 100, 200, 500, and 1000 projection view images, with the total imaging radiation dose held constant. We use the conventional fan-beam FBP algorithm and investigate the effect of varying the width of a Hanning window used in the reconstruction, since this affects both the noise properties of the image and the under-sampling artifacts which can arise in the case of sparse-view acquisitions. Our results demonstrate that fewer projection views should be used in order to increase HO performance, which in this case constitutes an upper-bound on human observer performance. However, the impact on HO SNR of using fewer projection views, each with a higher dose, is not as significant as the impact of employing regularization in the FBP reconstruction through a Hanning filter.

  13. Interdisciplinary group approach to occupational safety and health administration standard: reductions in cost and duplication of effort.

    PubMed

    Canola, T; Kirkis, E J; Meckes, P F; Pitts, S B

    1994-06-01

    After the December 1991 publication of the Occupational Safety and Health Administration standard, "Occupational Exposure to Bloodborne Pathogens; Final Rule," medical facilities in the United States were challenged to meet the mandates of this standard with massive training in a relatively short time. An interdisciplinary task force composed of representative members of a major health maintenance organization was charged with the task of developing a training plan for 11 Southern California medical centers and their 42 satellite medical offices. The task force ultimately developed, refined, and distributed a Trainer Guidebook that could be used by a variety of disciplines. This guidebook provided a method by which the information could be disseminated concisely, thoroughly, and promptly. The processes used in this project can be applied to other health care educational situations. The purpose of this article is to share these processes.

  14. Inter-Association Task Force Report on Image.

    ERIC Educational Resources Information Center

    Special Libraries Association, Washington, DC.

    In 1988, the Board of Directors of the Special Libraries Association provided funding to a task force to gather data which would determine how certain segments of society perceive librarians, how librarians view themselves and their colleagues, and to provide recommendations for addressing the issue of image. The task force project consisted of…

  15. Portable Common Execution Environment (PCEE) project review: Peer review

    NASA Technical Reports Server (NTRS)

    Locke, C. Douglass

    1991-01-01

    The purpose of the review was to conduct an independent, in-depth analysis of the PCEE project and to provide the results of said review. The review team was tasked with evaluating the potential contribution of the PCEE project to the improvement of the life cycle support of mission and safety critical (MASC) computing components for large, complex, non-stop, distributed systems similar to those planned for such NASA programs as the space station, lunar outpost, and manned missions to Mars. Some conclusions of the review team are as follow: The PCEE project was given high marks for its breath of vision on the overall problem with MASC software; Correlated with the sweeping vision, the Review Team is very skeptical that any research project can successfully attack such a broad range of problems; and several recommendations are made such as to identify the components of the broad solution envisioned, prioritizing them with respect to their impact and the likely ability of the PCEE or others to attack them successfully, and to rewrite its Concept Document differentiating the problem description, objectives, approach, and results so that the project vision becomes assessible to others.

  16. IEA Wind Task 36 Forecasting

    NASA Astrophysics Data System (ADS)

    Giebel, Gregor; Cline, Joel; Frank, Helmut; Shaw, Will; Pinson, Pierre; Hodge, Bri-Mathias; Kariniotakis, Georges; Sempreviva, Anna Maria; Draxl, Caroline

    2017-04-01

    Wind power forecasts have been used operatively for over 20 years. Despite this fact, there are still several possibilities to improve the forecasts, both from the weather prediction side and from the usage of the forecasts. The new International Energy Agency (IEA) Task on Wind Power Forecasting tries to organise international collaboration, among national weather centres with an interest and/or large projects on wind forecast improvements (NOAA, DWD, UK MetOffice, …) and operational forecaster and forecast users. The Task is divided in three work packages: Firstly, a collaboration on the improvement of the scientific basis for the wind predictions themselves. This includes numerical weather prediction model physics, but also widely distributed information on accessible datasets for verification. Secondly, we will be aiming at an international pre-standard (an IEA Recommended Practice) on benchmarking and comparing wind power forecasts, including probabilistic forecasts aiming at industry and forecasters alike. This WP will also organise benchmarks, in cooperation with the IEA Task WakeBench. Thirdly, we will be engaging end users aiming at dissemination of the best practice in the usage of wind power predictions, especially probabilistic ones. The Operating Agent is Gregor Giebel of DTU, Co-Operating Agent is Joel Cline of the US Department of Energy. Collaboration in the task is solicited from everyone interested in the forecasting business. We will collaborate with IEA Task 31 Wakebench, which developed the Windbench benchmarking platform, which this task will use for forecasting benchmarks. The task runs for three years, 2016-2018. Main deliverables are an up-to-date list of current projects and main project results, including datasets which can be used by researchers around the world to improve their own models, an IEA Recommended Practice on performance evaluation of probabilistic forecasts, a position paper regarding the use of probabilistic forecasts

  17. Constructing Knowledge via a Peer Interaction in a CAS Environment with Tasks Designed from a Task-Technique-Theory Perspective

    ERIC Educational Resources Information Center

    Hitt, Fernando; Kieran, Carolyn

    2009-01-01

    Our research project aimed at understanding the complexity of the construction of knowledge in a CAS environment. Basing our work on the French instrumental approach, in particular the Task-Technique-Theory (T-T-T) theoretical frame as adapted from Chevallard's Anthropological Theory of Didactics, we were mindful that a careful task design process…

  18. Human Factors Research in Anesthesia Patient Safety

    PubMed Central

    Weinger, Matthew B.; Slagle, Jason

    2002-01-01

    Patient safety has become a major public concern. Human factors research in other high-risk fields has demonstrated how rigorous study of factors that affect job performance can lead to improved outcome and reduced errors after evidence-based redesign of tasks or systems. These techniques have increasingly been applied to the anesthesia work environment. This paper describes data obtained recently using task analysis and workload assessment during actual patient care and the use of cognitive task analysis to study clinical decision making. A novel concept of “non-routine events” is introduced and pilot data are presented. The results support the assertion that human factors research can make important contributions to patient safety. Information technologies play a key role in these efforts.

  19. Human factors research in anesthesia patient safety.

    PubMed Central

    Weinger, M. B.; Slagle, J.

    2001-01-01

    Patient safety has become a major public concern. Human factors research in other high-risk fields has demonstrated how rigorous study of factors that affect job performance can lead to improved outcome and reduced errors after evidence-based redesign of tasks or systems. These techniques have increasingly been applied to the anesthesia work environment. This paper describes data obtained recently using task analysis and workload assessment during actual patient care and the use of cognitive task analysis to study clinical decision making. A novel concept of "non-routine events" is introduced and pilot data are presented. The results support the assertion that human factors research can make important contributions to patient safety. Information technologies play a key role in these efforts. PMID:11825287

  20. 25 CFR 170.144 - What are eligible highway safety projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-related deaths, injuries and accidents; (j) Impaired driver initiatives; (k) Child safety seat programs... travel on IRRs, such as guardrail construction and traffic markings; (f) Development of a safety management system; (g) Education and outreach highway safety programs, such as use of child safety seats...

  1. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  2. F14A System Safety Program Plan

    DTIC Science & Technology

    1981-09-03

    by block number) Electromagnetic Pulse (EMP) Safety Plans Test Program EMP Testing F14 Aircraft Plans 20 ABSTRACT (Continue on reverse side if...compromising completion of the required experimental tasks. This document addresses the safety aspect of performing an Electromagnetic Pulse (EMP) test

  3. The perceived compatibility of safety and production expectations in hazardous occupations.

    PubMed

    McLain, David L; Jarrell, Kimberly A

    2007-01-01

    Safety hazards are unavoidable in many work environments. Employees must be both productive and safe, however, conflicting safety and production demands can negatively affect safety, production, or both. The employee's perception of the compatibility of management's safety and production expectations is a possible predictor of such consequences. This paper defines "safety-production compatibility" and describes how measures of safety-production compatibility, as well as safety pressure and production pressure, were developed. We used LISREL structural equation modeling to test the influences of safety-production compatibility, safety pressure, and production pressure on safe work behavior and interference with performing other work tasks. The 239 study participants were workers employed in diverse but hazardous occupations. Pressure to work safely was positively associated with safe work behavior. The perceived compatibility of safety and production demands positively influenced safe work behavior and reduced the interference of safety hazards performing other tasks. Safety-production compatibility was also found to mediate the relationship between trust in management and safe work behavior. The results of this field study suggest increased compatibility, and thus less conflict, between safety and production demands influences safe work behavior and the interference of safety hazards with performing other work tasks. More broadly, the worker's reaction to multiple work demands is a safety and performance influence. Safety management efforts that focus only on the hazards fail to eliminate many accidents because accidents arise from many factors including technology, safety climate, social influences, production, and safety demands. This study suggests that workers differ in their perception of the compatibility of safety and production demands. These differences will show up in safe work behavior, influencing the effectiveness of safety management efforts and the

  4. Energy use in the marine transportation industry: Task III. Efficiency improvements; Task IV. Industry future. Final report, Volume IV. [Projections for year 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-12-01

    Tasks III and IV measure the characteristics of potential research and development programs that could be applied to the maritime industry. It was necessary to identify potential operating scenarios for the maritime industry in the year 2000 and determine the energy consumption that would result given those scenarios. After the introductory chapter the operational, regulatory, and vessel-size scenarios for the year 2000 are developed in Chapter II. In Chapter III, future cargo flows and expected levels of energy use for the baseline 2000 projection are determined. In Chapter IV, the research and development programs are introduced into the future USmore » flag fleet and the energy-savings potential associated with each is determined. The first four appendices (A through D) describe each of the generic technologies. The fifth appendix (E) contains the baseline operating and cost parameters against which 15 program areas were evaluated. (MCW)« less

  5. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part I - Task summary.

    DOT National Transportation Integrated Search

    1973-06-01

    This report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and re...

  6. An efficient temporal logic for robotic task planning

    NASA Technical Reports Server (NTRS)

    Becker, Jeffrey M.

    1989-01-01

    Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.

  7. Connected commercial vehicles — retrofit safety device kit project : safety applications and development plan.

    DOT National Transportation Integrated Search

    2014-03-01

    Connected vehicle wireless data communications can enable safety applications that may reduce injuries and fatalities. Cooperative vehicle-to-vehicle (V2V) safety applications will be effective only if a high fraction of vehicles are equipped. Deploy...

  8. Device research task (processing and high-efficiency solar cells)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    This task has been expanded since the last 25th Project Integration Meeting (PIM) to include process research in addition to device research. The objective of this task is to assist the Flat-plate Solar Array (FSA) Project in meeting its near- and long-term goals by identifying and implementing research in the areas of device physics, device structures, measurement techniques, material-device interactions, and cell processing. The research efforts of this task are described and reflect the deversity of device research being conducted. All of the contracts being reported are either completed or near completion and culminate the device research efforts of the FSA Project. Optimazation methods and silicon solar cell numerical models, carrier transport and recombination parameters in heavily doped silicon, development and analysis of silicon solar cells of near 20% efficiency, and SiN sub x passivation of silicon surfaces are discussed.

  9. Researchers' Roles in Patient Safety Improvement.

    PubMed

    Pietikäinen, Elina; Reiman, Teemu; Heikkilä, Jouko; Macchi, Luigi

    2016-03-01

    In this article, we explore how researchers can contribute to patient safety improvement. We aim to expand the instrumental role researchers have often occupied in relation to patient safety improvement. We reflect on our own improvement model and experiences as patient safety researchers in an ongoing Finnish multi-actor innovation project through self-reflective narration. Our own patient safety improvement model can be described as systemic. Based on the purpose of the innovation project, our improvement model, and the improvement models of the other actors in the project, we have carried out a wide range of activities. Our activities can be summarized in 8 overlapping patient safety improvement roles: modeler, influencer, supplier, producer, ideator, reflector, facilitator, and negotiator. When working side by side with "practice," researchers are offered and engage in several different activities. The way researchers contribute to patient safety improvement and balance between different roles depends on the purpose of the study, as well as on the underlying patient safety improvement models. Different patient safety research paradigms seem to emphasize different improvement roles, and thus, they also face different challenges. Open reflection on the underlying improvement models and roles can help researchers with different backgrounds-as well as other actors involved in patient safety improvement-in structuring their work and collaborating productively.

  10. A web-based tool for the Comprehensive Unit-based Safety Program (CUSP).

    PubMed

    Pronovost, Peter J; King, Jay; Holzmueller, Christine G; Sawyer, Melinda; Bivens, Shauna; Michael, Michelle; Haig, Kathy; Paine, Lori; Moore, Dana; Miller, Marlene

    2006-03-01

    An organization's ability to change is driven by its culture, which in turn has a significant impact on safety. The six-step Comprehensive Unit-Based Safety Program (CUSP) is intended to improve local culture and safety. A Web-based project management tool for CUSP was developed and then pilot tested at two hospitals. HOW ECUSP WORKS: Once a patient safety concern is identified (step 3), a unit-level interdisciplinary safety committee determines issue criticality and starts up the projects (step 4), which are managed using project management tools within eCUSP (step 5). On a project's completion, the results are disseminated through a shared story (step 6). OSF St. Joseph's Medical Center-The Medical Birthing Center (Bloomington, Illinois), identified 11 safety issues, implemented 11 projects, and created 9 shared stories--including one for its Armband Project. The Johns Hopkins Hospital (Baltimore) Medical Progressive Care (MPC4) Unit identified 5 safety issues and implemented 4 ongoing projects, including the intravenous (IV) Tubing Compliance Project. The eCUSP tool's success depends on an organizational commitment to creating a culture of safety.

  11. Hysteresis in Mental Workload and Task Performance: The Influence of Demand Transitions and Task Prioritization.

    PubMed

    Jansen, Reinier J; Sawyer, Ben D; van Egmond, René; de Ridder, Huib; Hancock, Peter A

    2016-12-01

    We examine how transitions in task demand are manifested in mental workload and performance in a dual-task setting. Hysteresis has been defined as the ongoing influence of demand levels prior to a demand transition. Authors of previous studies predominantly examined hysteretic effects in terms of performance. However, little is known about the temporal development of hysteresis in mental workload. A simulated driving task was combined with an auditory memory task. Participants were instructed to prioritize driving or to prioritize both tasks equally. Three experimental conditions with low, high, and low task demands were constructed by manipulating the frequency of lane changing. Multiple measures of subjective mental workload were taken during experimental conditions. Contrary to our prediction, no hysteretic effects were found after the high- to low-demand transition. However, a hysteretic effect in mental workload was found within the high-demand condition, which degraded toward the end of the high condition. Priority instructions were not reflected in performance. Online assessment of both performance and mental workload demonstrates the transient nature of hysteretic effects. An explanation for the observed hysteretic effect in mental workload is offered in terms of effort regulation. An informed arrival at the scene is important in safety operations, but peaks in mental workload should be avoided to prevent buildup of fatigue. Therefore, communication technologies should incorporate the historical profile of task demand. © 2016, Human Factors and Ergonomics Society.

  12. DriveID: safety innovation through individuation.

    PubMed

    Sawyer, Ben; Teo, Grace; Mouloua, Mustapha

    2012-01-01

    The driving task is highly complex and places considerable perceptual, physical and cognitive demands on the driver. As driving is fundamentally an information processing activity, distracted or impaired drivers have diminished safety margins compared with non- distracted drivers (Hancock and Parasuraman, 1992; TRB 1998 a & b). This competition for sensory and decision making capacities can lead to failures that cost lives. Some groups, teens and elderly drivers for example, have patterns of systematically poor perceptual, physical and cognitive performance while driving. Although there are technologies developed to aid these different drivers, these systems are often misused and underutilized. The DriveID project aims to design and develop a passive, automated face identification system capable of robustly identifying the driver of the vehicle, retrieve a stored profile, and intelligently prescribing specific accident prevention systems and driving environment customizations.

  13. Projecting manpower to attain quality

    NASA Technical Reports Server (NTRS)

    Rone, K. Y.

    1983-01-01

    The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.

  14. Development of a safety decision-making scenario to measure worker safety in agriculture.

    PubMed

    Mosher, G A; Keren, N; Freeman, S A; Hurburgh, C R

    2014-04-01

    Human factors play an important role in the management of occupational safety, especially in high-hazard workplaces such as commercial grain-handling facilities. Employee decision-making patterns represent an essential component of the safety system within a work environment. This research describes the process used to create a safety decision-making scenario to measure the process that grain-handling employees used to make choices in a safety-related work task. A sample of 160 employees completed safety decision-making simulations based on a hypothetical but realistic scenario in a grain-handling environment. Their choices and the information they used to make their choices were recorded. Although the employees emphasized safety information in their decision-making process, not all of their choices were safe choices. Factors influencing their choices are discussed, and implications for industry, management, and workers are shared.

  15. Evaluation of interactive highway safety design model crash prediction tools for two-lane rural roads on Kansas Department of Transportation projects.

    DOT National Transportation Integrated Search

    2014-01-01

    Historically, project-level decisions for the selection of highway features to promote safety were : based on either engineering judgment or adherence to accepted national guidance. These tools have allowed : highway designers to produce facilities t...

  16. Total safety management: An approach to improving safety culture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blush, S.M.

    A little over 4 yr ago, Admiral James D. Watkins became Secretary of Energy. President Bush, who had appointed him, informed Watkins that his principal task would be to clean up the nuclear weapons complex and put the US Department of Energy (DOE) back in the business of producing tritium for the nation's nuclear deterrent. Watkins recognized that in order to achieve these objectives, he would have to substantially improve the DOE's safety culture. Safety culture is a relatively new term. The International Atomic Energy Agency (IAEA) used it in a 1986 report on the root causes of the Chernobylmore » nuclear accident. In 1990, the IAEA's International Nuclear Safety Advisory Group issued a document focusing directly on safety culture. It provides guidelines to the international nuclear community for measuring the effectiveness of safety culture in nuclear organizations. Safety culture has two principal aspects: an organizational framework conducive to safety and the necessary organizational and individual attitudes that promote safety. These obviously go hand in hand. An organization must create the right framework to foster the right attitudes, but individuals must have the right attitudes to create the organizational framework that will support a good safety culture. The difficulty in developing such a synergistic relationship suggests that achieving and sustaining a strong safety culture is not easy, particularly in an organization whose safety culture is in serious disrepair.« less

  17. Ku- and Ka-Band Phased Array Antenna for the Space-Based Telemetry and Range Safety Project

    NASA Technical Reports Server (NTRS)

    Whiteman, Donald E.; Valencia, Lisa M.; Birr, Richard B.

    2005-01-01

    The National Aeronautics and Space Administration Space-Based Telemetry and Range Safety study is a multiphase project to increase data rates and flexibility and decrease costs by using space-based communications assets for telemetry during launches and landings. Phase 1 used standard S-band antennas with the Tracking and Data Relay Satellite System to obtain a baseline performance. The selection process and available resources for Phase 2 resulted in a Ku-band phased array antenna system. Several development efforts are under way for a Ka-band phased array antenna system for Phase 3. Each phase includes test flights to demonstrate performance and capabilities. Successful completion of this project will result in a set of communications requirements for the next generation of launch vehicles.

  18. Smart Grid Communications Security Project, U.S. Department of Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, Frank

    There were four groups that worked on this project in different areas related to Smart Girds and Security. They included faculty and students from electric computer and energy engineering, law, business and sociology. The results of the work are summarized in a verity of reports, papers and thesis. A major report to the Governor of Colorado’s energy office with contributions from all the groups working on this project is given bellow. Smart Grid Deployment in Colorado: Challenges and Opportunities, Report to Colorado Governor’s Energy Office and Colorado Smart Grid Task Force(2010) (Kevin Doran, Frank Barnes, and Puneet Pasrich, eds.) Thismore » report includes information on the state of the grid cyber security, privacy, energy storage and grid stability, workforce development, consumer behavior with respect to the smart grid and safety issues.« less

  19. A Task Analysis of Selected Nuclear Technician Occupations.

    ERIC Educational Resources Information Center

    Braden, Paul V.; Paul, Krishan K.

    A task analysis of nuclear technician occupations in selected organizations in the Southern Interstate Nuclear Board Region was conducted as part of a research and development project leading to a nuclear technician manpower information system for these 17 states. In order to answer 11 questions focusing on task performance frequency and…

  20. Summary document of tasks performed on the Shuttle-C/NLS contract

    NASA Technical Reports Server (NTRS)

    1993-01-01

    During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.

  1. A transportation-scheduling system for managing silvicultural projects

    Treesearch

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  2. Improved processes for meeting the data requirements for implementing the Highway Safety Manual (HSM) and Safety Analyst in Florida.

    DOT National Transportation Integrated Search

    2014-03-01

    Recent research in highway safety has focused on the more advanced and statistically proven techniques of highway : safety analysis. This project focuses on the two most recent safety analysis tools, the Highway Safety Manual (HSM) : and SafetyAnalys...

  3. Human Health Effects, Task Force Assessment, Preliminary Report.

    ERIC Educational Resources Information Center

    Aronow, Wilbert S.; And Others

    Presented in this preliminary report is one of seven assessments conducted by a special task force of Project Clean Air, the Human Health Effects Task Force. The reports summarize assessments of the state of knowledge on various air pollution problems, particularly in California, and make tentative recommendations as to what the University of…

  4. Feedback from uncertainties propagation research projects conducted in different hydraulic fields: outcomes for engineering projects and nuclear safety assessment.

    NASA Astrophysics Data System (ADS)

    Bacchi, Vito; Duluc, Claire-Marie; Bertrand, Nathalie; Bardet, Lise

    2017-04-01

    In recent years, in the context of hydraulic risk assessment, much effort has been put into the development of sophisticated numerical model systems able reproducing surface flow field. These numerical models are based on a deterministic approach and the results are presented in terms of measurable quantities (water depths, flow velocities, etc…). However, the modelling of surface flows involves numerous uncertainties associated both to the numerical structure of the model, to the knowledge of the physical parameters which force the system and to the randomness inherent to natural phenomena. As a consequence, dealing with uncertainties can be a difficult task for both modelers and decision-makers [Ioss, 2011]. In the context of nuclear safety, IRSN assesses studies conducted by operators for different reference flood situations (local rain, small or large watershed flooding, sea levels, etc…), that are defined in the guide ASN N°13 [ASN, 2013]. The guide provides some recommendations to deal with uncertainties, by proposing a specific conservative approach to cover hydraulic modelling uncertainties. Depending of the situation, the influencing parameter might be the Strickler coefficient, levee behavior, simplified topographic assumptions, etc. Obviously, identifying the most influencing parameter and giving it a penalizing value is challenging and usually questionable. In this context, IRSN conducted cooperative (Compagnie Nationale du Rhone, I-CiTy laboratory of Polytech'Nice, Atomic Energy Commission, Bureau de Recherches Géologiques et Minières) research activities since 2011 in order to investigate feasibility and benefits of Uncertainties Analysis (UA) and Global Sensitivity Analysis (GSA) when applied to hydraulic modelling. A specific methodology was tested by using the computational environment Promethee, developed by IRSN, which allows carrying out uncertainties propagation study. This methodology was applied with various numerical models and in

  5. Hydrogen Safety Project: Chemical analysis support task. Window ``E`` analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, T E; Campbell, J A; Hoppe, E W

    1992-09-01

    Core samples taken from tank 101-SY at Hanford during ``window E`` were analyzed for organic and radiochemical constituents by staff of the Analytical Chemistry Laboratory at Pacific Northwest Laboratory. Westinghouse Hanford company submitted these samples to the laboratory.

  6. TxDOT administration research : tasks completed in FY2009.

    DOT National Transportation Integrated Search

    2010-01-01

    Texas Department of Transportation (TxDOT) Project 0-6581-TI, TxDOT Administration : Research, encompasses multiple tasks that explore and support administrative aspects of : transportation research. : The project term began in October 2008 and has b...

  7. 77 FR 73734 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... by the Engineering and System Safety Task Forces. This agenda is subject to change, including the... National Transportation Safety Board, and the Federal Transit Administration. The diversity of the...

  8. National Park Service Traffic Safety Management System Concept.

    DOT National Transportation Integrated Search

    2005-04-30

    It is the responsibility of the National Park Service (NPS) to ensure the safety of visitors traveling on its roads. To accomplish this task, the NPS needs to know the status of traffic safety within the parks to understand where improvements are nee...

  9. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated inmore » the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.« less

  10. Youth doing dangerous tasks: Supervision matters.

    PubMed

    Zierold, Kristina M

    2017-09-01

    Supervisors are partially responsible for ensuring that teens are safe at work. The purpose of this study was to explore whether supervision is related to teens' willingness to do a dangerous task at work. A mixed-methods study consisting of focus groups and a cross-sectional survey was conducted with teens from two public high schools. If asked by a supervisor, 21% of working teens would do a dangerous task. After controlling for gender and age, teens whose supervisor did not establish weekly goals (AOR = 3.54, 95%CI = 1.55-8.08), teens who perceived their supervisors as not approachable (AOR = 2.35, 95%CI = 1.34-4.13), and teens who were not comfortable talking about safety issues (AOR = 1.97, 95%CI = 1.08-3.61) were more likely to do a dangerous task if asked by their supervisors. This study indicates that how teens perceive their supervisor may be associated with whether teens do a dangerous task when asked by their supervisor. © 2017 Wiley Periodicals, Inc.

  11. Functional Task Test: 1. Sensorimotor changes Associated with Postflight Alterations in Astronaut Functional Task Performance

    NASA Technical Reports Server (NTRS)

    Bloomberg, J. J.; Arzeno, N. H.; Buxton, R. E.; Feiveson, A. H.; Kofman, I. S.; Lee, S. M. C.; Miller, C. A.; Mulavara, A. P.; Platts, S. H.; Peters, B. T.; hide

    2011-01-01

    Space flight is known to cause alterations in multiple physiological systems including changes in sensorimotor, cardiovascular, and neuromuscular systems. These changes may affect a crewmember s ability to perform critical mission tasks immediately after landing on a planetary surface. The overall goal of this project is to determine the effects of space flight on functional tests that are representative of high priority exploration mission tasks and to identify the key underlying physiological factors that contribute to decrements in performance. This presentation will focus on the sensorimotor contributions to postflight functional performance.

  12. Project Artemis

    NASA Technical Reports Server (NTRS)

    Birchenough, Shawn; Kato, Denise; Kennedy, Fred; Akin, David

    1990-01-01

    The goals of Project Artemis are designed to meet the challege of President Bush to return to the Moon, this time to stay. The first goal of the project is to establish a permanent manned base on the Moon for the purposes of scientific research and technological development. The knowledge gained from the establishment and operations of the lunar base will then be used to achieve the second goal of Project Artemis, the establishment of a manned base on the Martian surface. Throughout both phases of the program, crew safety will be the number one priority. There are four main issues that have governed the entire program: crew safety and mission success, commonality, growth potential, and costing and scheduling. These issues are discussed in more detail.

  13. An Award-Winning Approach To Lead Safety.

    ERIC Educational Resources Information Center

    Compton-Lilly, Catherine

    2002-01-01

    Details how a lead safety project funded in the Toyota Tapestry Grant program provided students with the resources to test for and discover lead present in their recently renovated school. Discusses how the lead safety project played out across grade levels within the school. (DDR)

  14. Ergonomics, safety, and resilience in the helicopter offshore transportation system of Campos Basin.

    PubMed

    Gomes, José Orlando; Huber, Gilbert J; Borges, Marcos R S; de Carvalho, Paulo Victor R

    2015-01-01

    Air transportation of personnel to offshore oil platforms is one of the major hazards of this kind of endeavor. Pilot performance is a key factor in the safety of the transportation system. This study seeks to identify the ergonomic factors present in pilots' activities that may in some way compromise or enhance their performance, the constraints and affordances which they are subject to; and where possible to link these to their associated risk factors. Methodology adopted in this project studies work in its context. It is a merging of Activity Analysis (Guerin et al. 2001) of European tradition with Cognitive Task Analysis (CTA - www.ctaresource.com) articulated with the recent approaches to cognitive systems engineering developed by Professors David Woods and Erik Hollnagel. Fifty-five hours of field interviews provided the input for analysis. Sixteen ergonomic constraints were identified, some cognitive, some physical, all considered relevant by the research subjects and expert advisers. Although the safety record of the personnel transportation system studied is considered acceptable, there is low hanging fruit to be picked which can help improve the system's safety.

  15. 77 FR 52393 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... provided by the Engineering and System Safety Task Forces, and a presentation on headwear will be provided... Safety Board, and the Federal Transit Administration. The diversity of the Committee ensures the...

  16. USDOT guidance summary for connected vehicle deployments : safety management.

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...

  17. Developing a Highway Safety Fundamentals Course : Research Project Capsule

    DOT National Transportation Integrated Search

    2012-10-01

    Although the need for road : safety education was fi rst : recognized in the 1960s, : recently it has become an : increasingly urgent issue. To : fulfi ll the hefty goal set up by : the AASHTO Highway : Safety Strategy (cutting : traffi c fatalities ...

  18. Commercial vehicle (CV) retrofit safety device (RSD) kits project.

    DOT National Transportation Integrated Search

    2014-07-01

    Retrofit Safety Device (RSD) kits were developed and deployed on commercial vehicles as part of the U.S. DOT Connected Vehicle Safety Pilot to gain insight into the unique aspects of deploying connected vehicle technology in a commercial vehicle envi...

  19. NASA's Big Data Task Force

    NASA Astrophysics Data System (ADS)

    Holmes, C. P.; Kinter, J. L.; Beebe, R. F.; Feigelson, E.; Hurlburt, N. E.; Mentzel, C.; Smith, G.; Tino, C.; Walker, R. J.

    2017-12-01

    Two years ago NASA established the Ad Hoc Big Data Task Force (BDTF - https://science.nasa.gov/science-committee/subcommittees/big-data-task-force), an advisory working group with the NASA Advisory Council system. The scope of the Task Force included all NASA Big Data programs, projects, missions, and activities. The Task Force focused on such topics as exploring the existing and planned evolution of NASA's science data cyber-infrastructure that supports broad access to data repositories for NASA Science Mission Directorate missions; best practices within NASA, other Federal agencies, private industry and research institutions; and Federal initiatives related to big data and data access. The BDTF has completed its two-year term and produced several recommendations plus four white papers for NASA's Science Mission Directorate. This presentation will discuss the activities and results of the TF including summaries of key points from its focused study topics. The paper serves as an introduction to the papers following in this ESSI session.

  20. Development of safety performance monitoring procedures.

    DOT National Transportation Integrated Search

    2010-02-01

    Highway safety is an ongoing concern to the Texas Department of Transportation (TxDOT). As part of its : proactive commitment to improving highway safety, TxDOT is moving toward including quantitative safety : analyses earlier in the project developm...

  1. Authentic Assessment through Rich Tasks

    ERIC Educational Resources Information Center

    Wrigley, Terry

    2017-01-01

    This short article explains the key principles of "rich tasks," a version of authentic assessment developed in Queensland, Australia, as part of a major curriculum development called the "New Basics." In various documents, the project leaders recognised the danger that inappropriate assessment would undermine the proposed…

  2. Advanced Crash Avoidance Technologies (ACAT) Program - Final Report of the Volvo-Ford-UMTRI Project: Safety Impact Methodology for Lane Departure Warning - Method Development and Estimation of Benefits

    DOT National Transportation Integrated Search

    2010-10-01

    The Volvo-Ford-UMTRI project: Safety Impact Methodology (SIM) for Lane Departure Warning is part of the U.S. Department of Transportation's Advanced Crash Avoidance Technologies (ACAT) program. The project developed a basic analytical framework for e...

  3. Advanced structures technology and aircraft safety

    NASA Technical Reports Server (NTRS)

    Mccomb, H. G., Jr.

    1983-01-01

    NASA research and development on advanced aeronautical structures technology related to flight safety is reviewed. The effort is categorized as research in the technology base and projects sponsored by the Aircraft Energy Efficiency (ACEE) Project Office. Base technology research includes mechanics of composite structures, crash dynamics, and landing dynamics. The ACEE projects involve development and fabrication of selected composite structural components for existing commercial transport aircraft. Technology emanating from this research is intended to result in airframe structures with improved efficiency and safety.

  4. Patient safety--worker safety: building a culture of safety to improve healthcare worker and patient well-being.

    PubMed

    Yassi, Annalee; Hancock, Tina

    2005-01-01

    Patient safety within the Canadian healthcare system is currently a high national priority, which merits a comprehensive understanding of the underlying causes of adverse events. Not least among these is worker health and safety, which is linked to patient outcomes. Healthcare workers have a high risk of workplace injuries and more mental health problems than most other occupational groups. Many healthcare professionals feel fatigued, stressed, in pain, or at risk of illness or injury-factors they feel impede their ability to provide consistent quality care. With this background, the Occupational Health and Safety Agency for Healthcare (OHSAH) in British Columbia, jointly governed by healthcare unions and healthcare employers, launched several major initiatives to improve the healthcare workplace. These included the promotion of safe patient handling, adaptive clothing, scheduled toileting, stroke management training, measures to improve management of aggressive behaviour and, of course, infection control-all intended to improve the safety of workers, but also to improve patient safety and quality of care. Other projects also explicitly promoting physical and mental health at work, as well as patient safety are also underway. Results of the projects are at various stages of completion, but ample evidence has already been obtained to indicate that looking after the well-being of healthcare workers results in safer and better quality patient care. While more research is needed, our work to date suggests that a comprehensive systems approach to promoting a climate of safety, which includes taking into account workplace organizational factors and physical and psychological hazards for workers, is the best way to improve the healthcare workplace and thereby patient safety.

  5. Teen worker safety training: methods used, lessons taught, and time spent.

    PubMed

    Zierold, Kristina M

    2015-05-01

    Safety training is strongly endorsed as one way to prevent teens from performing dangerous tasks at work. The objective of this mixed methods study was to characterize the safety training that teenagers receive on the job. From 2010 through 2012, focus groups and a cross-sectional survey were conducted with working teens. The top methods of safety training reported were safety videos (42 percent) and safety lectures (25 percent). The top lessons reported by teens were "how to do my job" and "ways to spot hazards." Males, who were more likely to do dangerous tasks, received less safety training than females. Although most teens are getting safety training, it is inadequate. Lessons addressing safety behaviors are missing, training methods used are minimal, and the time spent is insignificant. More research is needed to understand what training methods and lessons should be used, and the appropriate safety training length for effectively preventing injury in working teens. In addition, more research evaluating the impact of high-quality safety training compared to poor safety training is needed to determine the best training programs for teens. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  6. 78 FR 26423 - Railroad Safety Advisory Committee; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Engineering and System Safety Task Forces. This agenda is subject to change, including the possible addition.... See the RSAC Web site for details on prior RSAC activities and pending tasks at: http://rsac.fra.dot...

  7. ACOEM practice guidelines: opioids and safety-sensitive work.

    PubMed

    Hegmann, Kurt T; Weiss, Michael S; Bowden, Kirk; Branco, Fernando; DuBrueler, Kimberly; Els, Charl; Mandel, Steven; McKinney, David W; Miguel, Rafael; Mueller, Kathryn L; Nadig, Robert J; Schaffer, Michael I; Studt, Larry; Talmage, James B; Travis, Russell L; Winters, Thomas; Thiese, Matthew S; Harris, Jeffrey S

    2014-07-01

    ACOEM has updated the treatment guidelines concerning opioids. This report highlights the safety-sensitive work recommendation that has been developed. Comprehensive literature reviews were accomplished with article abstraction, critiquing, grading, evidence table compilation, and guideline finalization by a multidisciplinary expert panel to develop evidence-based guidance. A total of 12 moderate-quality studies were identified to address motor vehicle crash risk, and none regarding other work among opioid-using patients. Acute or chronic opioid use is not recommended for patients who perform safety-sensitive jobs. These jobs include operating motor vehicles, other modes of transportation, forklift driving, overhead crane operation, heavy equipment operation and tasks involving high levels of cognitive function and judgment. Quality evidence consistently demonstrates increased risk of vehicle crashes and is recommended as the surrogate for other safety-sensitive work tasks.

  8. National Dam Safety Program. Ursel Gingerich Dam (MO 10393), Mississippi - Salt - Quincy River Basin, Schuyler County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1979-12-01

    34 which identifies the program element, project, task area, and work unit or equivalent under which the work was authorized. Block 11. Controlling ...Dam Inventory and Inspection Section, LMSED-PD ULSF 210 Tucker Blvd., North, St. Louis, Mo. 63101D C O 11. CONTROLLING OFFICE NAME AND ADDRESS 12m...under the National Program of Inspection of Non -Federal Dams. This report assesses the general condition of the dam with a respect to safety, based on

  9. Safety in Schools: An Integral Approach

    ERIC Educational Resources Information Center

    Gairin, Joaquin; Castro, Diego

    2011-01-01

    The present paper summarizes a research project into integral safety in schools. The aims of this particular research are, firstly, to evaluate the degree of integral safety in schools, secondly, to propose means for improving prevention and integral safety systems and thirdly, to identify the characteristics of safety culture. The field work was…

  10. Laboratory Safety in the Biology Lab.

    ERIC Educational Resources Information Center

    Ritch, Donna; Rank, Jane

    2001-01-01

    Reports on a research project to determine if students possess and comprehend basic safety knowledge. Shows a significant increase in the amount of safety knowledge gained when students are exposed to various topics in laboratory safety and are held accountable for learning the information as required in a laboratory safety course. (Author/MM)

  11. Desktop Computing Integration Project

    NASA Technical Reports Server (NTRS)

    Tureman, Robert L., Jr.

    1992-01-01

    The Desktop Computing Integration Project for the Human Resources Management Division (HRMD) of LaRC was designed to help division personnel use personal computing resources to perform job tasks. The three goals of the project were to involve HRMD personnel in desktop computing, link mainframe data to desktop capabilities, and to estimate training needs for the division. The project resulted in increased usage of personal computers by Awards specialists, an increased awareness of LaRC resources to help perform tasks, and personal computer output that was used in presentation of information to center personnel. In addition, the necessary skills for HRMD personal computer users were identified. The Awards Office was chosen for the project because of the consistency of their data requests and the desire of employees in that area to use the personal computer.

  12. The IUGS/IAGC Task Group on Global Geochemical Baselines

    USGS Publications Warehouse

    Smith, David B.; Wang, Xueqiu; Reeder, Shaun; Demetriades, Alecos

    2012-01-01

    The Task Group on Global Geochemical Baselines, operating under the auspices of both the International Union of Geological Sciences (IUGS) and the International Association of Geochemistry (IAGC), has the long-term goal of establishing a global geochemical database to document the concentration and distribution of chemical elements in the Earth’s surface or near-surface environment. The database and accompanying element distribution maps represent a geochemical baseline against which future human-induced or natural changes to the chemistry of the land surface may be recognized and quantified. In order to accomplish this long-term goal, the activities of the Task Group include: (1) developing partnerships with countries conducting broad-scale geochemical mapping studies; (2) providing consultation and training in the form of workshops and short courses; (3) organizing periodic international symposia to foster communication among the geochemical mapping community; (4) developing criteria for certifying those projects whose data are acceptable in a global geochemical database; (5) acting as a repository for data collected by those projects meeting the criteria for standardization; (6) preparing complete metadata for the certified projects; and (7) preparing, ultimately, a global geochemical database. This paper summarizes the history and accomplishments of the Task Group since its first predecessor project was established in 1988.

  13. Planetary image conversion task

    NASA Technical Reports Server (NTRS)

    Martin, M. D.; Stanley, C. L.; Laughlin, G.

    1985-01-01

    The Planetary Image Conversion Task group processed 12,500 magnetic tapes containing raw imaging data from JPL planetary missions and produced an image data base in consistent format on 1200 fully packed 6250-bpi tapes. The output tapes will remain at JPL. A copy of the entire tape set was delivered to US Geological Survey, Flagstaff, Ariz. A secondary task converted computer datalogs, which had been stored in project specific MARK IV File Management System data types and structures, to flat-file, text format that is processable on any modern computer system. The conversion processing took place at JPL's Image Processing Laboratory on an IBM 370-158 with existing software modified slightly to meet the needs of the conversion task. More than 99% of the original digital image data was successfully recovered by the conversion task. However, processing data tapes recorded before 1975 was destructive. This discovery is of critical importance to facilities responsible for maintaining digital archives since normal periodic random sampling techniques would be unlikely to detect this phenomenon, and entire data sets could be wiped out in the act of generating seemingly positive sampling results. Reccomended follow-on activities are also included.

  14. Design and Testing of the Safety Agenda Mobile App for Managing Health Care Managers’ Patient Safety Responsibilities

    PubMed Central

    Carrillo, Irene; Fernandez, Cesar; Vicente, Maria Asuncion; Guilabert, Mercedes

    2016-01-01

    Background Adverse events are a reality in clinical practice. Reducing the prevalence of preventable adverse events by stemming their causes requires health managers’ engagement. Objective The objective of our study was to develop an app for mobile phones and tablets that would provide managers with an overview of their responsibilities in matters of patient safety and would help them manage interventions that are expected to be carried out throughout the year. Methods The Safety Agenda Mobile App (SAMA) was designed based on standardized regulations and reviews of studies about health managers’ roles in patient safety. A total of 7 managers used a beta version of SAMA for 2 months and then they assessed and proposed improvements in its design. Their experience permitted redesigning SAMA, improving functions and navigation. A total of 74 Spanish health managers tried out the revised version of SAMA. After 4 months, their assessment was requested in a voluntary and anonymous manner. Results SAMA is an iOS app that includes 37 predefined tasks that are the responsibility of health managers. Health managers can adapt these tasks to their schedule, add new ones, and share them with their team. SAMA menus are structured in 4 main areas: information, registry, task list, and settings. Of the 74 users who tested SAMA, 64 (86%) users provided a positive assessment of SAMA characteristics and utility. Over an 11-month period, 238 users downloaded SAMA. This mobile app has obtained the AppSaludable (HealthyApp) Quality Seal. Conclusions SAMA includes a set of activities that are expected to be carried out by health managers in matters of patient safety and contributes toward improving the awareness of their responsibilities in matters of safety. PMID:27932315

  15. Drinking-driving knowledge, attitudes and behavior : an analysis of the 1973 and 1974 household surveys of the Fairfax Alcohol Safety Action Project.

    DOT National Transportation Integrated Search

    1976-01-01

    The results of the 1974 Household Survey of the Fairfax Alcohol Safety Action Project indicated an unimpressive level of factual knowledge which had not increased significantly since the 1973 survey. There were virtually no meaningful shifts in the r...

  16. Task Analysis Assessment on Intrastate Bus Traffic Controllers

    NASA Astrophysics Data System (ADS)

    Yen Bin, Teo; Azlis-Sani, Jalil; Nur Annuar Mohd Yunos, Muhammad; Ismail, S. M. Sabri S. M.; Tajedi, Noor Aqilah Ahmad

    2016-11-01

    Public transportation acts as social mobility and caters the daily needs of the society for passengers to travel from one place to another. This is true for a country like Malaysia where international trade has been growing significantly over the past few decades. Task analysis assessment was conducted with the consideration of cognitive ergonomic view towards problem related to human factors. Conducting research regarding the task analysis on bus traffic controllers had allowed a better understanding regarding the nature of work and the overall monitoring activities of the bus services. This paper served to study the task analysis assessment on intrastate bus traffic controllers and the objectives of this study include to conduct task analysis assessment on the bus traffic controllers. Task analysis assessment for the bus traffic controllers was developed via Hierarchical Task Analysis (HTA). There are a total of five subsidiary tasks on level one and only two were able to be further broken down in level two. Development of HTA allowed a better understanding regarding the work and this could further ease the evaluation of the tasks conducted by the bus traffic controllers. Thus, human error could be reduced for the safety of all passengers and increase the overall efficiency of the system. Besides, it could assist in improving the operation of the bus traffic controllers by modelling or synthesizing the existing tasks if necessary.

  17. The Northern Virginia Supported Employment "Safety Nets" Demonstration Project. Final Evaluation Report (for October 1, 1991, through September 30, 1992).

    ERIC Educational Resources Information Center

    Wurbacher and Associates, Takoma Park, MD.

    This report describes results and conclusions of a third-party evaluation of a 1-year demonstration project in Alexandria (Virginia) to develop "safety nets" for 12 people with disabilities who were either unemployed or with a history of unemployment. An Employment Security Specialist worked with these individuals and their families to:…

  18. Joint road safety operations in tunnels and open roads

    NASA Astrophysics Data System (ADS)

    Adesiyun, Adewole; Avenoso, Antonio; Dionelis, Kallistratos; Cela, Liljana; Nicodème, Christophe; Goger, Thierry; Polidori, Carlo

    2017-09-01

    The objective of the ECOROADS project is to overcome the barrier established by the formal interpretation of the two Directives 2008/96/EC and 2004/54/EC, which in practice do not allow the same Road Safety Audits/Inspections to be performed inside tunnels. The projects aims at the establishment of a common enhanced approach to road infrastructure and tunnel safety management by using the concepts and criteria of the Directive 2008/96/CE on road infrastructure safety management and the results of related European Commission (EC) funded projects. ECOROADS has already implemented an analysis of national practices regarding Road Safety Inspections (RSI), two Workshops with the stakeholders, and an exchange of best practices between European tunnel experts and road safety professionals, which led to the definition of common agreed safety procedures. In the second phase of the project, different groups of experts and observers applied the above common procedures by inspecting five European road sections featuring both open roads and tunnels in Belgium, Albania, Germany, Serbia and Former Yugoslav Republic of Macedonia. This paper shows the feedback of the 5 joint safety operations and how they are being used for a set of - recommendations and guidelines for the application of the RSA and RSI concepts within the tunnel safety operations.

  19. Explore The NASA Safety Center

    NASA Image and Video Library

    2015-07-01

    The NASA Safety Center (NSC) reports to NASA’s Office of Safety and Mission Assurance and supports the Safety and Mission Assurance (SMA) requirements of NASA’s portfolio of programs and projects. The NSC focuses on development of the personnel, processes and tools needed for the safe and successful achievement of NASA’s strategic goals.

  20. Design of an Adaptive Human-Machine System Based on Dynamical Pattern Recognition of Cognitive Task-Load.

    PubMed

    Zhang, Jianhua; Yin, Zhong; Wang, Rubin

    2017-01-01

    This paper developed a cognitive task-load (CTL) classification algorithm and allocation strategy to sustain the optimal operator CTL levels over time in safety-critical human-machine integrated systems. An adaptive human-machine system is designed based on a non-linear dynamic CTL classifier, which maps a set of electroencephalogram (EEG) and electrocardiogram (ECG) related features to a few CTL classes. The least-squares support vector machine (LSSVM) is used as dynamic pattern classifier. A series of electrophysiological and performance data acquisition experiments were performed on seven volunteer participants under a simulated process control task environment. The participant-specific dynamic LSSVM model is constructed to classify the instantaneous CTL into five classes at each time instant. The initial feature set, comprising 56 EEG and ECG related features, is reduced to a set of 12 salient features (including 11 EEG-related features) by using the locality preserving projection (LPP) technique. An overall correct classification rate of about 80% is achieved for the 5-class CTL classification problem. Then the predicted CTL is used to adaptively allocate the number of process control tasks between operator and computer-based controller. Simulation results showed that the overall performance of the human-machine system can be improved by using the adaptive automation strategy proposed.

  1. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walker, Randy M; Gross, Ian G; Smith, Cyrus M

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulnessmore » of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal

  2. Long-Term Safety of Repeated Blood-Brain Barrier Opening via Focused Ultrasound with Microbubbles in Non-Human Primates Performing a Cognitive Task.

    PubMed

    Downs, Matthew E; Buch, Amanda; Sierra, Carlos; Karakatsani, Maria Eleni; Teichert, Tobias; Chen, Shangshang; Konofagou, Elisa E; Ferrera, Vincent P

    2015-01-01

    Focused Ultrasound (FUS) coupled with intravenous administration of microbubbles (MB) is a non-invasive technique that has been shown to reliably open (increase the permeability of) the blood-brain barrier (BBB) in multiple in vivo models including non-human primates (NHP). This procedure has shown promise for clinical and basic science applications, yet the safety and potential neurological effects of long term application in NHP requires further investigation under parameters shown to be efficacious in that species (500 kHz, 200-400 kPa, 4-5 μm MB, 2 minute sonication). In this study, we repeatedly opened the BBB in the caudate and putamen regions of the basal ganglia of 4 NHP using FUS with systemically-administered MB over 4-20 months. We assessed the safety of the FUS with MB procedure using MRI to detect edema or hemorrhaging in the brain. Contrast enhanced T1-weighted MRI sequences showed a 98% success rate for openings in the targeted regions. T2-weighted and SWI sequences indicated a lack edema in the majority of the cases. We investigated potential neurological effects of the FUS with MB procedure through quantitative cognitive testing of' visual, cognitive, motivational, and motor function using a random dot motion task with reward magnitude bias presented on a touchpanel display. Reaction times during the task significantly increased on the day of the FUS with MB procedure. This increase returned to baseline within 4-5 days after the procedure. Visual motion discrimination thresholds were unaffected. Our results indicate FUS with MB can be a safe method for repeated opening of the BBB at the basal ganglia in NHP for up to 20 months without any long-term negative physiological or neurological effects with the parameters used.

  3. How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk.

    PubMed

    Ellinas, Christos; Allan, Neil; Durugbo, Christopher; Johansson, Anders

    2015-01-01

    Current societal requirements necessitate the effective delivery of complex projects that can do more while using less. Yet, recent large-scale project failures suggest that our ability to successfully deliver them is still at its infancy. Such failures can be seen to arise through various failure mechanisms; this work focuses on one such mechanism. Specifically, it examines the likelihood of a project sustaining a large-scale catastrophe, as triggered by single task failure and delivered via a cascading process. To do so, an analytical model was developed and tested on an empirical dataset by the means of numerical simulation. This paper makes three main contributions. First, it provides a methodology to identify the tasks most capable of impacting a project. In doing so, it is noted that a significant number of tasks induce no cascades, while a handful are capable of triggering surprisingly large ones. Secondly, it illustrates that crude task characteristics cannot aid in identifying them, highlighting the complexity of the underlying process and the utility of this approach. Thirdly, it draws parallels with systems encountered within the natural sciences by noting the emergence of self-organised criticality, commonly found within natural systems. These findings strengthen the need to account for structural intricacies of a project's underlying task precedence structure as they can provide the conditions upon which large-scale catastrophes materialise.

  4. Evaluation of interactive highway safety design model crash prediction tools for two-lane rural roads on Kansas Department of Transportation projects : [technical summary].

    DOT National Transportation Integrated Search

    2014-01-01

    Historically, project-level decisions for the selection of highway features to promote safety were based on either engineering judgment or adherence to accepted national guidance. These tools have allowed highway designers to produce facilities that ...

  5. 78 FR 26217 - National Building Safety Month, 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Building Safety Month, 2013 By the President of the United States of America A Proclamation When natural.... This month, as we pay tribute to professionals who design, construct, and secure our infrastructure... standards. This month, we take up those tasks once more and recommit to safety in the year ahead. NOW...

  6. Quantifying Vermont transportation safety factors.

    DOT National Transportation Integrated Search

    2010-01-01

    VTrans and its partners have selected traffic safety : priority areas in their Strategic Highway Safety Plan. : In this project, researchers focus on three of these : prioritized critical emphasis areas: 1) Keeping vehicles : on the roadway, 2) Young...

  7. [Case Study] CityCenter and Cosmopolitan Construction Projects, Las Vegas, Nevada: lessons learned from the use of multiple sources and mixed methods in a safety needs assessment.

    PubMed

    Gittleman, Janie L; Gardner, Paige C; Haile, Elizabeth; Sampson, Julie M; Cigularov, Konstantin P; Ermann, Erica D; Stafford, Pete; Chen, Peter Y

    2010-06-01

    The present study describes a response to eight tragic deaths over an eighteen month times span on a fast track construction project on the largest commercial development project in U.S. history. Four versions of a survey were distributed to workers, foremen, superintendents, and senior management. In addition to standard Likert-scale safety climate scale items, an open-ended item was included at the end of the survey. Safety climate perceptions differed by job level. Specifically, management perceived a more positive safety climate as compared to workers. Content analysis of the open-ended item was used to identify important safety and health concerns which might have been overlooked with the qualitative portion of the survey. The surveys were conducted to understand workforce issues of concern with the aim of improving site safety conditions. Such efforts can require minimal investment of resources and time and result in critical feedback for developing interventions affecting organizational structure, management processes, and communication. The most important lesson learned was that gauging differences in perception about site safety can provide critical feedback at all levels of a construction organization. Implementation of multi-level organizational perception surveys can identify major safety issues of concern. Feedback, if acted upon, can potentially result in fewer injuries and fatal events. (c) 2010 Elsevier Ltd. All rights reserved.

  8. A Software Safety Risk Taxonomy for Use in Retrospective Safety Cases

    NASA Technical Reports Server (NTRS)

    Hill, Janice L.

    2007-01-01

    Safety standards contain technical and process-oriented safely requirements. The best time to include these requirements is early in the development lifecycle of the system. When software safety requirements are levied on a legacy system after the fact, a retrospective safety case will need to be constructed for the software in the system. This can be a difficult task because there may be few to no art facts available to show compliance to the software safely requirements. The risks associated with not meeting safely requirements in a legacy safely-critical computer system must be addressed to give confidence for reuse. This paper introduces a proposal for a software safely risk taxonomy for legacy safely-critical computer systems, by specializing the Software Engineering Institute's 'Software Development Risk Taxonomy' with safely elements and attributes.

  9. Task Design and Interaction in Collaborative Writing: The Students' Story

    ERIC Educational Resources Information Center

    Bremner, Stephen; Peirson-Smith, Anne; Jones, Rodney; Bhatia, Vijay

    2014-01-01

    This article investigates student behaviour on collaborative assignments, looking at the relationship between task type and interaction, and considers the implications for task design. Students reported on interactions in a year-long workplace-focussed group communication project, comparing these with interactions on other academy-based group…

  10. Onboard Safety Technology Survey Synthesis - Final Report

    DOT National Transportation Integrated Search

    2008-01-01

    The Federal Motor Carrier Safety Administration (FMCSA) funded this project to collect, merge, and conduct an assessment of onboard safety system surveys and resulting data sets that may benefit commercial vehicle operations safety and future researc...

  11. Multi-Task Project to Provide Research Support for Human Research and Engineering Goals Identified by the Army

    DTIC Science & Technology

    2009-06-01

    Jefferson City, MO Phone:573-681-5126 E-mail: rooneyi(a>lincolnu.edu Principle Investigators for contract’s 5 Task Areas: Task I : James Rooney...identified Tasks all structured within a single contract. This contract contained Five Task areas: Task I was an administrative task; Task II-V were...Manager’s Overview of the Report (Task I ) 3. Summary Final Budget Invoice and Budget unspent balance 4. Technical Reports of the Research Tasks (II - V

  12. NASA Expendable Launch Vehicle (ELV) Payload Safety Review Process

    NASA Technical Reports Server (NTRS)

    Starbus, Calvert S.; Donovan, Shawn; Dook, Mike; Palo, Tom

    2007-01-01

    Issues addressed by this program: (1) Complicated roles and responsibilities associated with multi-partner projects (2) Working relationships and communications between all organizations involved in the payload safety process (3) Consistent interpretation and implementation of safety requirements from one project to the rest (4) Consistent implementation of the Tailoring Process (5) Clearly defined NASA decision-making-authority (6) Bring Agency-wide perspective to each ElV payload project. Current process requires a Payload Safety Working Group (PSWG) for eac payload with representatives from all involved organizations.

  13. Multifamily Building Operator Job/Task Analysis and Report: September 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, C. M.

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Building Operator JTA identifies and catalogs all of the tasks performed by multifamily building operators, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  14. Multifamily Energy Auditor Job/Task Analysis and Report: September 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, C. M.

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Energy Auditor JTA identifies and catalogs all of the tasks performed by multifamily energy auditors, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  15. Proceedings of the Nuclear Criticality Technology Safety Workshop

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rene G. Sanchez

    1998-04-01

    This document contains summaries of most of the papers presented at the 1995 Nuclear Criticality Technology Safety Project (NCTSP) meeting, which was held May 16 and 17 at San Diego, Ca. The meeting was broken up into seven sessions, which covered the following topics: (1) Criticality Safety of Project Sapphire; (2) Relevant Experiments For Criticality Safety; (3) Interactions with the Former Soviet Union; (4) Misapplications and Limitations of Monte Carlo Methods Directed Toward Criticality Safety Analyses; (5) Monte Carlo Vulnerabilities of Execution and Interpretation; (6) Monte Carlo Vulnerabilities of Representation; and (7) Benchmark Comparisons.

  16. Laser safety at high profile projects

    NASA Astrophysics Data System (ADS)

    Barat, K.

    2011-03-01

    Laser Safety at high profile laser facilities tends to be more controlled than in the standard laser lab found at a research institution. The reason for this is the potential consequences for such facilities from incidents. This ranges from construction accidents, to equipment damage to personnel injuries. No laser user wants to sustain a laser eye injury. Unfortunately, many laser users, most commonly experienced researchers and inexperienced graduate students, do receive laser eye injuries during their careers. . More unforgiveable is the general acceptance of this scenario, as part of the research & development experience. How do senior researchers, safety personnel and management stop this trend? The answer lies in a cultural change that involves institutional training, user mentoring, hazard awareness by users and administrative controls. None of these would inhibit research activities. As a matter of fact, proper implementation of these controls would increase research productivity. This presentation will review and explain the steps needed to steer an institution, research division, group or individual lab towards a culture that should nearly eliminate laser accidents. As well as how high profile facilities try to avoid laser injuries. Using the definition of high profile facility as one who's funding in the million to billions of dollars or Euros and derives form government funding.

  17. OPERATION CASTLE. Radiological Safety. Volume 1

    DTIC Science & Technology

    1985-09-01

    OPERATION CASTLE Radiological Safety Final Report Volume I Headquarters Joint Task Force Seven Technical Branch, J-3 Division Washington, DC...Spring 1954 EXTRACTED VERSION DTIC -uECTE MAR031986 NOTICE: This is an extract of Operation CASTLE, Radiological Safety, Final Report, Volume I ...SYMBOL (If jpQiictbl») ■ i PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER 8c AOORESS (G(y, SU(t tncl ZIRCod») 10 SOURCE OF FUNDING NUMBERS PROGRAM

  18. Acquisition and production of skilled behavior in dynamic decision-making tasks

    NASA Technical Reports Server (NTRS)

    Kirlik, Alex

    1992-01-01

    Detailed summaries of two NASA-funded research projects are provided. The first project was an ecological task analysis of the Star Cruiser model. Star Cruiser is a psychological model designed to test a subject's level of cognitive activity. Ecological task analysis is used as a framework to predict the types of cognitive activity required to achieve productive behavior and to suggest how interfaces can be manipulated to alleviate certain types of cognitive demands. The second project is presented in the form of a thesis for the Masters Degree. The thesis discusses the modeling of decision-making through the use of neural network and genetic-algorithm machine learning technologies.

  19. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  20. Cockpit task management: A preliminary, normative theory

    NASA Technical Reports Server (NTRS)

    Funk, Ken

    1991-01-01

    Cockpit task management (CTM) involves the initiation, monitoring, prioritizing, and allocation of resources to concurrent tasks as well as termination of multiple concurrent tasks. As aircrews have more tasks to attend to due to reduced crew sizes and the increased complexity of aircraft and the air transportation system, CTM will become a more critical factor in aviation safety. It is clear that many aviation accidents and incidents can be satisfactorily explained in terms of CTM errors, and it is likely that more accidents induced by poor CTM practice will occur in the future unless the issue is properly addressed. The first step in understanding and facilitating CTM behavior was the development of a preliminary, normative theory of CTM which identifies several important CTM functions. From this theory, some requirements for pilot-vehicle interfaces were developed which are believed to facilitate CTM. A prototype PVI was developed which improves CTM performance and currently, a research program is under way that is aimed at developing a better understanding of CTM and facilitating CTM performance through better equipment and procedures.

  1. Task conflict effect in task switching.

    PubMed

    Braverman, Ami; Meiran, Nachshon

    2010-11-01

    A part of action preparation is deciding what the relevant task is. This task-decision process is conceptually separate from response selection. To show this, the authors manipulated task conflict in a spatial task-switching paradigm, using conflict stimuli that appeared during trials with univalent targets (affording 1 task). The conflict stimuli afforded task identity because they were used as task cues with bivalent targets (affording 2 tasks) that were intermixed with the univalent targets. Thus, for univalent targets, irrelevant stimuli either caused low task conflict or high task conflict. In three experiments, the authors found poorer performance in high task conflict trials than in low task conflict trials. Task conflict was introduced during target appearance (Experiment 1) or task preparation (Experiments 2 and 3). In the latter case, the task conflict effect decreased with increasing task preparation time showing that task preparation involves task decision.

  2. Validated Competency Task Lists for Apparel and Accessories Marketing.

    ERIC Educational Resources Information Center

    Selke-Kern, Barbara E.

    Developed by a project that validated task lists by a variety of teachers and apparel marketing business persons, this guide contains task lists for occupations in the field of apparel and accessories marketing. The guide is organized in three sections. Section 1 includes the following: (1) notes on using the information in the guide; (2) a…

  3. Innovative tools and techniques in identifying highway safety improvement projects : project summary.

    DOT National Transportation Integrated Search

    2017-01-01

    Researchers completed the following activities: - Reviewed the literature, state HSIP processes and practices, and HSIP tools used by various agencies. - Evaluated the applicability of safety assessment methods and tools used by other states and loca...

  4. Area Reports. Advanced materials and devices research area. Silicon materials research task, and advanced silicon sheet task

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The objectives of the Silicon Materials Task and the Advanced Silicon Sheet Task are to identify the critical technical barriers to low-cost silicon purification and sheet growth that must be overcome to produce a PV cell substrate material at a price consistent with Flat-plate Solar Array (FSA) Project objectives and to overcome these barriers by performing and supporting appropriate R&D. Progress reports are given on silicon refinement using silane, a chemical vapor transport process for purifying metallurgical grade silicon, silicon particle growth research, and modeling of silane pyrolysis in fluidized-bed reactors.

  5. Chronic Conditions, Workplace Safety, And Job Demands Contribute To Absenteeism And Job Performance.

    PubMed

    Jinnett, Kimberly; Schwatka, Natalie; Tenney, Liliana; Brockbank, Claire V S; Newman, Lee S

    2017-02-01

    An aging workforce, increased prevalence of chronic health conditions, and the potential for longer working lives have both societal and economic implications. We analyzed the combined impact of workplace safety, employee health, and job demands (work task difficulty) on worker absence and job performance. The study sample consisted of 16,926 employees who participated in a worksite wellness program offered by a workers' compensation insurer to their employers-314 large, midsize, and small businesses in Colorado across multiple industries. We found that both workplace safety and employees' chronic health conditions contributed to absenteeism and job performance, but their impact was influenced by the physical and cognitive difficulty of the job. If employers want to reduce health-related productivity losses, they should take an integrated approach to mitigate job-related injuries, promote employee health, and improve the fit between a worker's duties and abilities. Project HOPE—The People-to-People Health Foundation, Inc.

  6. 1999 Florida Freight Stakeholders Task Force Report

    DOT National Transportation Integrated Search

    1999-11-01

    The Florida Freight Stakeholders Task Force was organized in 1998 as a result of the Governor's Transportation Summit to address two principal objectives: (1) to identify, prioritize and recommend freight transportation projects for fast track fundin...

  7. Status report on the effects of the 65 mph speed limit on Virginia's rural interstate highway system : submitted to the Secretary of Transportation and Public Safety from the Secretarial Task Force on Interstate Highway Speed limits.

    DOT National Transportation Integrated Search

    1989-01-01

    In 1987, the Secretary of Transportation and Public Safety created a task force to study the potential effects of raising the speed limit on rural interstate highways in Virginia. In its 1988 session, the Virginia General Assembly passed legislation ...

  8. Project health and safety plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abston, J.P.

    1997-04-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Gunite and Associated Tanks (GAAT) in the North and South Tank Farms (NTF and STF) at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to health and safety (H and S) issues. The policy and procedures in this plan apply to all GAAT operations in the NTF and STF. The provisions of this plan are to bemore » carried out whenever activities identifies s part of the GAAT are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices in order to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air. This plan explains additional task-specific health and safety requirements such as the Site Safety and health Addendum and Activity Hazard Analysis, which should be used in concert with this plan and existing established procedures.« less

  9. Project FARE Task V : Industry Control Board Meeting (ICB-1)

    DOT National Transportation Integrated Search

    1975-12-16

    Under Project FARE (Financial Accounting and Reporting Elements, (IT-06-0034), uniform standards, definitions, and procedures for reporting, financial and operating data by the urban transit industry were developed. The objective of this project was ...

  10. Hanford Environmental Dose Reconstruction Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  11. Task Virtuality and Its Effect on Student Project Team Effectiveness

    ERIC Educational Resources Information Center

    Pineda, Rodley C.

    2015-01-01

    This study explores the extent to which students in colocated teams use synchronous and asynchronous computer-mediated communication channels (task virtuality) and how this use affects their perceptions of the team's performance, their satisfaction with the team, and the learning they derive from the process. Survey results show that different…

  12. Trends in drinking-driving at night : a comparison of the first five roadside surveys of the Fairfax Alcohol Safety Action Project : final report.

    DOT National Transportation Integrated Search

    1976-01-01

    This report outlines the findings of the first five annual roadside surveys conducted in conjunction with the Fairfax Alcohol Safety Action Project (ASAP). The baseline survey was conducted in January of 1972 with the four subsequent surveys being co...

  13. Perceptions of Challenging Tasks and Achievement by New Zealand Students

    ERIC Educational Resources Information Center

    Linsell, Chris; Holmes, Marilyn; Sullivan, Peter

    2016-01-01

    This paper examines the learning by students who were participating in a project designed to promote persistence while working on mathematical tasks. We examined their learning of mathematics concepts and learning about the processes of engaging in mathematical tasks. There were substantial increases in students' knowledge of angles and also…

  14. Development of a task-level robot programming and simulation system

    NASA Technical Reports Server (NTRS)

    Liu, H.; Kawamura, K.; Narayanan, S.; Zhang, G.; Franke, H.; Ozkan, M.; Arima, H.; Liu, H.

    1987-01-01

    An ongoing project in developing a Task-Level Robot Programming and Simulation System (TARPS) is discussed. The objective of this approach is to design a generic TARPS that can be used in a variety of applications. Many robotic applications require off-line programming, and a TARPS is very useful in such applications. Task level programming is object centered in that the user specifies tasks to be performed instead of robot paths. Graphics simulation provides greater flexibility and also avoids costly machine setup and possible damage. A TARPS has three major modules: world model, task planner and task simulator. The system architecture, design issues and some preliminary results are given.

  15. How safe is tuning a radio?: using the radio tuning task as a benchmark for distracted driving.

    PubMed

    Lee, Ja Young; Lee, John D; Bärgman, Jonas; Lee, Joonbum; Reimer, Bryan

    2018-01-01

    Drivers engage in non-driving tasks while driving, such as interactions entertainment systems. Studies have identified glance patterns related to such interactions, and manual radio tuning has been used as a reference task to set an upper bound on the acceptable demand of interactions. Consequently, some view the risk associated with radio tuning as defining the upper limit of glance measures associated with visual-manual in-vehicle activities. However, we have little knowledge about the actual degree of crash risk that radio tuning poses and, by extension, the risk of tasks that have similar glance patterns as the radio tuning task. In the current study, we use counterfactual simulation to take the glance patterns for manual radio tuning tasks from an on-road experiment and apply these patterns to lead-vehicle events observed in naturalistic driving studies. We then quantify how often the glance patterns from radio tuning are associated with rear-end crashes, compared to driving only situations. We used the pre-crash kinematics from 34 crash events from the SHRP2 naturalistic driving study to investigate the effect of radio tuning in crash-imminent situations, and we also investigated the effect of radio tuning on 2,475 routine braking events from the Safety Pilot project. The counterfactual simulation showed that off-road glances transform some near-crashes that could have been avoided into crashes, and glance patterns observed in on-road radio tuning experiment produced 2.85-5.00 times more crashes than baseline driving. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  17. Getting a Fresh Perspective on School Safety Audits

    ERIC Educational Resources Information Center

    Folks, Kenneth H.; Hirth, Marilyn A.

    2009-01-01

    For most people, a safety audit entails the completion of a long list of very routine, relatively mundane tasks because someone, somewhere, thought it was important. They usually comply grudgingly because it is yet another duty that has been added to their already full plate. Safety audits are usually required by insurance companies or some other…

  18. 77 FR 26815 - Motor Carrier Safety Advisory Committee (MCSAC): Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ...--005; H-08-013; H-09-019--020; and H-09-037--041. Long-Haul Cross Border Trucking Pilot Program Task... Metro station. Copies of all MCSAC Task Statements and an agenda for the entire meeting will be made... Transportation Safety Board (NTSB) At this meeting, the MCSAC will hear presentations and deliberate on Task 12...

  19. 24 CFR 51.203 - Safety standards.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Safety standards. 51.203 Section 51... Conventional Fuels or Chemicals of an Explosive or Flammable Nature § 51.203 Safety standards. The following... from a hazard: (a) Thermal Radiation Safety Standard. Projects shall be located so that: (1) The...

  20. 24 CFR 51.203 - Safety standards.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Safety standards. 51.203 Section 51... Conventional Fuels or Chemicals of an Explosive or Flammable Nature § 51.203 Safety standards. The following... from a hazard: (a) Thermal Radiation Safety Standard. Projects shall be located so that: (1) The...

  1. Failure Modes Effects and Criticality Analysis, an Underutilized Safety, Reliability, Project Management and Systems Engineering Tool

    NASA Astrophysics Data System (ADS)

    Mullin, Daniel Richard

    2013-09-01

    The majority of space programs whether manned or unmanned for science or exploration require that a Failure Modes Effects and Criticality Analysis (FMECA) be performed as part of their safety and reliability activities. This comes as no surprise given that FMECAs have been an integral part of the reliability engineer's toolkit since the 1950s. The reasons for performing a FMECA are well known including fleshing out system single point failures, system hazards and critical components and functions. However, in the author's ten years' experience as a space systems safety and reliability engineer, findings demonstrate that the FMECA is often performed as an afterthought, simply to meet contract deliverable requirements and is often started long after the system requirements allocation and preliminary design have been completed. There are also important qualitative and quantitative components often missing which can provide useful data to all of project stakeholders. These include; probability of occurrence, probability of detection, time to effect and time to detect and, finally, the Risk Priority Number. This is unfortunate as the FMECA is a powerful system design tool that when used effectively, can help optimize system function while minimizing the risk of failure. When performed as early as possible in conjunction with writing the top level system requirements, the FMECA can provide instant feedback on the viability of the requirements while providing a valuable sanity check early in the design process. It can indicate which areas of the system will require redundancy and which areas are inherently the most risky from the onset. Based on historical and practical examples, it is this author's contention that FMECAs are an immense source of important information for all involved stakeholders in a given project and can provide several benefits including, efficient project management with respect to cost and schedule, system engineering and requirements management

  2. Infrared Cephalic-Vein to Assist Blood Extraction Tasks: Automatic Projection and Recognition

    NASA Astrophysics Data System (ADS)

    Lagüela, S.; Gesto, M.; Riveiro, B.; González-Aguilera, D.

    2017-05-01

    Thermal infrared band is not commonly used in photogrammetric and computer vision algorithms, mainly due to the low spatial resolution of this type of imagery. However, this band captures sub-superficial information, increasing the capabilities of visible bands regarding applications. This fact is especially important in biomedicine and biometrics, allowing the geometric characterization of interior organs and pathologies with photogrammetric principles, as well as the automatic identification and labelling using computer vision algorithms. This paper presents advances of close-range photogrammetry and computer vision applied to thermal infrared imagery, with the final application of Augmented Reality in order to widen its application in the biomedical field. In this case, the thermal infrared image of the arm is acquired and simultaneously projected on the arm, together with the identification label of the cephalic-vein. This way, blood analysts are assisted in finding the vein for blood extraction, especially in those cases where the identification by the human eye is a complex task. Vein recognition is performed based on the Gaussian temperature distribution in the area of the vein, while the calibration between projector and thermographic camera is developed through feature extraction and pattern recognition. The method is validated through its application to a set of volunteers, with different ages and genres, in such way that different conditions of body temperature and vein depth are covered for the applicability and reproducibility of the method.

  3. Understanding patient safety performance and educational needs using the 'Safety-II' approach for complex systems.

    PubMed

    McNab, Duncan; Bowie, Paul; Morrison, Jill; Ross, Alastair

    2016-11-01

    Participation in projects to improve patient safety is a key component of general practice (GP) specialty training, appraisal and revalidation. Patient safety training priorities for GPs at all career stages are described in the Royal College of General Practitioners' curriculum. Current methods that are taught and employed to improve safety often use a 'find-and-fix' approach to identify components of a system (including humans) where performance could be improved. However, the complex interactions and inter-dependence between components in healthcare systems mean that cause and effect are not always linked in a predictable manner. The Safety-II approach has been proposed as a new way to understand how safety is achieved in complex systems that may improve quality and safety initiatives and enhance GP and trainee curriculum coverage. Safety-II aims to maximise the number of events with a successful outcome by exploring everyday work. Work-as-done often differs from work-as-imagined in protocols and guidelines and various ways to achieve success, dependent on work conditions, may be possible. Traditional approaches to improve the quality and safety of care often aim to constrain variability but understanding and managing variability may be a more beneficial approach. The application of a Safety-II approach to incident investigation, quality improvement projects, prospective analysis of risk in systems and performance indicators may offer improved insight into system performance leading to more effective change. The way forward may be to combine the Safety-II approach with 'traditional' methods to enhance patient safety training, outcomes and curriculum coverage.

  4. Baltimore applications project

    NASA Technical Reports Server (NTRS)

    Golden, T. S.; Yaffee, P.

    1978-01-01

    The Baltimore Applications Project (BAP) was originally designed as an experimental effort to assist the government of the City of Baltimore in applying technology to the solution of municipal problems. Recent modifications in the structuring and operation of the program are discussed. A tabular update on the individual tasks undertaken and their treatment is provided. Details of energy and nonenergy related tasks are presented in appendices.

  5. A Report of the Child Labor Task Force.

    ERIC Educational Resources Information Center

    Oregon State Bureau of Labor and Industry, Portland.

    A task force studied youth work and its impact on the health, education, and safety of 16- and 17-year-olds. The study covered such issues as the following: effects of work on school performance, work's physical and psychological effects on young people, the effects work can have on young people's preparation for lifelong work, and what steps can…

  6. EPSRC Principles of Robotics: commentary on safety, robots as products, and responsibility

    NASA Astrophysics Data System (ADS)

    Boddington, Paula

    2017-04-01

    The EPSRC Principles of Robotics refer to safety. How safety is understood is relative to how tasks are characterised and identified. But the exact task(s) a robot plays within a complex system of agency may be hard to identify. If robots are seen as products, it is nonetheless vital that the safety and other implications of their use in situ must also be considered carefully, and they must be fit for purpose. The Principles identify humans as responsible, rather than robots. We must thus understand how the replacement of human agency by robotic agency may impact upon attributions of responsibility. The Principles seek to fit into existing systems of law and ethics. But these may need development, and in certain context, attention to more local regulations is also needed. A distinction between ethical issues related to the design of robotics, and to their use, may be needed in the Principles.

  7. Language Tasks Using Touch Screen and Mobile Technologies: Reconceptualizing Task-Based CALL for Young Language Learners

    ERIC Educational Resources Information Center

    Pellerin, Martine

    2014-01-01

    This article examines how the use of mobile technologies (iPods and tablets) in language classrooms contributes to redesigning task-based approaches for young language learners. The article is based on a collaborative action research (CAR) project in Early French Immersion classrooms in the province of Alberta, Canada. The data collection included…

  8. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  9. [The INSuLa Project: the survey of training needs in the SPSAL(Service for Prevention and Safety in the Work Environment)].

    PubMed

    Martini, Agnese; Iavicoli, Sergio; Bonafede, Michela; Corso, Luca; Iosuel, Michela; Isolani, Lucia; Di Leone, Giorgio; Di Marzio, Davide; Bertazzi, Pier Alberto

    2014-01-01

    According to Italian Legislative Decree 81/2008 and subsequent modifications the Regions and Autonomous Provinces have a innovative and complex role: 1) to regulate and coordinate the total prevention system and 2) to develop interventions/initiatives through regional/local occupational safety and health (OSH) department using not only inspections and controls but education, training and support. Recommendations also include consolidating the role of actors involved in preventing risks to occupational health throughout occupational safety and health education and training, keys for a successful process to improve prevention system. As result of changing world of work and OSH legislation the INSuLa project has creating a national survey involving of all Italian prevention system actors, in order to evaluate implementation and impact of the actual regulations. According to overall objective of the INSuLA project, for the first time in Italy, we studied about operators in regional/local OSH department. The purpose of this paper is to show and recognize the individual learning paths, the perception of adequacy education degree, the exploring criticalities andthe training needs.

  10. Workload and Performance in Air Traffic Control: Exploring the Influence of Levels of Automation and Variation in Task Demand

    NASA Technical Reports Server (NTRS)

    Edwards, Tamsyn El; Martin, Lynne; Bienert, Nancy; Mercer, Joey

    2017-01-01

    In air traffic control, task demand and workload have important implications for the safety and efficiency of air traffic. Task demand is dynamic, however, research on demand transitions and associated controller perception and performance is limited. In addition, there is a comparatively restricted understanding of the influence of task demand transitions on workload and performance, in association with automation. This study used an air traffic control simulation to investigate the influence of task demand transitions and two conditions of varying automation, on workload and efficiency-related performance. Findings showed that a both the direction of the task demand variation, and the amount of automation, influenced the relationship between workload and performance. Further research is needed to enhance understanding of demand transition and workload history effects on operator experience and performance, in both air traffic control and other safety-critical domains.

  11. NACA Wartime Safety Poster

    NASA Image and Video Library

    1945-04-21

    One of many safety posters produced by NACA artists during World War II. The Aircraft Engine Research Laboratory established a Safety Office in 1942 to coordinate and oversee safety-related activities. The lab struggled to maintain a full staff during the war when military research projects were at a peak. NACA management mandated six-day work weeks without overtime and the elimination of holidays. As such, workplace injuries were a serious threat to maintaining productivity needed to sustain the military’s aeronautics efforts.

  12. Occupational-Specific Strength Predicts Astronaut-Related Task Performance in a Weighted Suit.

    PubMed

    Taylor, Andrew; Kotarsky, Christopher J; Bond, Colin W; Hackney, Kyle J

    2018-01-01

    Future space missions beyond low Earth orbit will require deconditioned astronauts to perform occupationally relevant tasks within a planetary spacesuit. The prediction of time-to-completion (TTC) of astronaut tasks will be critical for crew safety, autonomous operations, and mission success. This exploratory study determined if the addition of task-specific strength testing to current standard lower body testing would enhance the prediction of TTC in a 1-G test battery. Eight healthy participants completed NASA lower body strength tests, occupationally specific strength tests, and performed six task simulations (hand drilling, construction wrenching, incline walking, collecting weighted samples, and dragging an unresponsive crewmember to safety) in a 48-kg weighted suit. The TTC for each task was recorded and summed to obtain a total TTC for the test battery. Linear regression was used to predict total TTC with two models: 1) NASA lower body strength tests; and 2) NASA lower body strength tests + occupationally specific strength tests. Total TTC of the test battery ranged from 20.2-44.5 min. The lower body strength test alone accounted for 61% of the variability in total TTC. The addition of hand drilling and wrenching strength tests accounted for 99% of the variability in total TTC. Adding occupationally specific strength tests (hand drilling and wrenching) to standard lower body strength tests successfully predicted total TTC in a performance test battery within a weighted suit. Future research should couple these strength tests with higher fidelity task simulations to determine the utility and efficacy of task performance prediction.Taylor A, Kotarsky CJ, Bond CW, Hackney KJ. Occupational-specific strength predicts astronaut-related task performance in a weighted suit. Aerosp Med Hum Perform. 2018; 89(1):58-62.

  13. Performance-based workload assessment: Allocation strategy and added task sensitivity

    NASA Technical Reports Server (NTRS)

    Vidulich, Michael A.

    1990-01-01

    The preliminary results of a research program investigating the use of added tasks to evaluate mental workload are reviewed. The focus of the first studies was a reappraisal of the traditional secondary task logic that encouraged the use of low-priority instructions for the added task. It was believed that such low-priority tasks would encourage subjects to split their available resources among the two tasks. The primary task would be assigned all the resources it needed, and any remaining reserve capacity would be assigned to the secondary task. If the model were correct, this approach was expected to combine sensitivity to primary task difficulty with unintrusiveness to primary task performance. The first studies of the current project demonstrated that a high-priority added task, although intrusive, could be more sensitive than the traditional low-priority secondary task. These results suggested that a more appropriate model of the attentional effects associated with added task performance might be based on capacity switching, rather than the traditional optimal allocation model.

  14. Heuristics in Managing Complex Clinical Decision Tasks in Experts' Decision Making.

    PubMed

    Islam, Roosan; Weir, Charlene; Del Fiol, Guilherme

    2014-09-01

    Clinical decision support is a tool to help experts make optimal and efficient decisions. However, little is known about the high level of abstractions in the thinking process for the experts. The objective of the study is to understand how clinicians manage complexity while dealing with complex clinical decision tasks. After approval from the Institutional Review Board (IRB), three clinical experts were interviewed the transcripts from these interviews were analyzed. We found five broad categories of strategies by experts for managing complex clinical decision tasks: decision conflict, mental projection, decision trade-offs, managing uncertainty and generating rule of thumb. Complexity is created by decision conflicts, mental projection, limited options and treatment uncertainty. Experts cope with complexity in a variety of ways, including using efficient and fast decision strategies to simplify complex decision tasks, mentally simulating outcomes and focusing on only the most relevant information. Understanding complex decision making processes can help design allocation based on the complexity of task for clinical decision support design.

  15. Multifamily Quality Control Inspector Job/Task Analysis and Report: September 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, C. M.

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Quality Control Inspector JTA identifies and catalogs all of the tasks performed by multifamily quality control inspectors, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  16. Multi-tasking arbitration and behaviour design for human-interactive robots

    NASA Astrophysics Data System (ADS)

    Kobayashi, Yuichi; Onishi, Masaki; Hosoe, Shigeyuki; Luo, Zhiwei

    2013-05-01

    Robots that interact with humans in household environments are required to handle multiple real-time tasks simultaneously, such as carrying objects, collision avoidance and conversation with human. This article presents a design framework for the control and recognition processes to meet these requirements taking into account stochastic human behaviour. The proposed design method first introduces a Petri net for synchronisation of multiple tasks. The Petri net formulation is converted to Markov decision processes and processed in an optimal control framework. Three tasks (safety confirmation, object conveyance and conversation) interact and are expressed by the Petri net. Using the proposed framework, tasks that normally tend to be designed by integrating many if-then rules can be designed in a systematic manner in a state estimation and optimisation framework from the viewpoint of the shortest time optimal control. The proposed arbitration method was verified by simulations and experiments using RI-MAN, which was developed for interactive tasks with humans.

  17. Fourth Year Status Report. Computerized Training Systems Project. Project ABACUS.

    DTIC Science & Technology

    1976-08-01

    in 7 9. PERFORMING ORGANIZATION NAME AND ADOMEN ,,, 10. PROGRAM ELEMENT. PROJECT , TASK US Army Tra ining Support Center A R E A S WORK UNIT NUMBERS...transp ired during the fourth year of Project ABACUS, the A rmy ’s program for the development of a Computerized Training System. It inc l udes a...have transpired durlnq the fourth year of Project ABACUS, the Army ’s program for the developmen t o~ aprototype Computer i zed Training System. It

  18. Knowledge of Previous Tasks: Task Similarity Influences Bias in Task Duration Predictions

    PubMed Central

    Thomas, Kevin E.; König, Cornelius J.

    2018-01-01

    Bias in predictions of task duration has been attributed to misremembering previous task duration and using previous task duration as a basis for predictions. This research sought to further examine how previous task information affects prediction bias by manipulating task similarity and assessing the role of previous task duration feedback. Task similarity was examined through participants performing two tasks 1 week apart that were the same or different. Duration feedback was provided to all participants (Experiment 1), its recall was manipulated (Experiment 2), and its provision was manipulated (Experiment 3). In all experiments, task similarity influenced bias on the second task, with predictions being less biased when the first task was the same task. However, duration feedback did not influence bias. The findings highlight the pivotal role of knowledge about previous tasks in task duration prediction and are discussed in relation to the theoretical accounts of task duration prediction bias. PMID:29881362

  19. Documenting quality improvement and patient safety efforts: the quality portfolio. A statement from the academic hospitalist taskforce.

    PubMed

    Taylor, Benjamin B; Parekh, Vikas; Estrada, Carlos A; Schleyer, Anneliese; Sharpe, Bradley

    2014-01-01

    Physicians increasingly investigate, work, and teach to improve the quality of care and safety of care delivery. The Society of General Internal Medicine Academic Hospitalist Task Force sought to develop a practical tool, the quality portfolio, to systematically document quality and safety achievements. The quality portfolio was vetted with internal and external stakeholders including national leaders in academic medicine. The portfolio was refined for implementation to include an outlined framework, detailed instructions for use and an example to guide users. The portfolio has eight categories including: (1) a faculty narrative, (2) leadership and administrative activities, (3) project activities, (4) education and curricula, (5) research and scholarship, (6) honors, awards, and recognition, (7) training and certification, and (8) an appendix. The authors offer this comprehensive, yet practical tool as a method to document quality and safety activities. It is relevant for physicians across disciplines and institutions and may be useful as a standalone document or as an adjunct to traditional promotion documents. As the Next Accreditation System is implemented, academic medical centers will require faculty who can teach and implement the systems-based practice requirements. The quality portfolio is a method to document quality improvement and safety activities.

  20. Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 3 Full-scale Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Blythe

    2007-05-01

    This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of a flue gas desulfurization (FGD) additive, Degussa Corporation's TMT-15, to prevent the reemission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine TMT salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal.more » The project is conducting pilot- and full-scale tests of the TMT-15 additive in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} reemissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Power River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, TXU Generation Company LP, Southern Company, and Degussa Corporation. TXU Generation has provided the Texas lignite/PRB cofired test site for pilot FGD tests, Monticello Steam Electric Station Unit 3. Southern Company is providing the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems to be tested. IPL, an AES company, provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Degussa Corporation is providing the TMT-15 additive and technical support to the test program as cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive

  1. Results of EUREKA project STILMED: transfer to standards

    NASA Astrophysics Data System (ADS)

    Woellmer, Wolfgang

    1996-12-01

    The final results of the German part of the joint project STILMED 'Safety Technology in Laser Medicine' are available and being prepared for publication. The question is raised, if parts of these results may be subject to international standards. An overview is given for the structure and procedure of national, European and international standardization. Existing standards are considered concerning their relationship to STILMED, which dealt with the chemical, particulate and microbiological composition and possible hazards of laser plume, as well as protection means, like plume evacuators, including the development of nozzles and instruments with integrated evacuation channels, and face masks. Results of basic research and experiences with medical treatment modalities are not matter for standardization. On the other hand, plume evacuators and their technical data should be submitted to standards, which define test procedures for their performance and safety. Also, surgical face masks, for which no international standards exists, could be well suited for standardization, although the multitude of application conditions would make it an excessive task. At least, products that claim 'for laser use' or 'laserproof' or similar should fulfill standardized requirements, and the respective wording needs protection by standard definition.

  2. Environmental health and safety independent investigation of the in situ vitrification melt expulsion at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    At about 6:12 pm, EDT on April 21, 1996, steam and molten material were expelled from Pit 1 in situ vitrification (ISV) project at the Oak Ridge National Laboratory (ORNL). At the request of the director of the Environmental Restoration (ER) Division, Department of Energy Oak Ridge Operations (DOE ORO), an independent investigation team was established on April 26, 1996. This team was tasked to determine the facts related to the ORNL Pit 1 melt expulsion event (MEE) in the areas of environment safety and health concerns such as the adequacy of the ISV safety systems; operational control restrictions; emergencymore » response planning/execution; and readiness review, and report the investigation team findings within 45 days from the date of incident. These requirements were stated in the letter of appointment presented in Appendix A of this report. This investigation did not address the physical causes of the MEE. A separate investigation was conducted by ISV project personnel to determine the causes of the melt expulsion and the extent of the effects of this phenomenon. In response to this event, occurrence report ORO-LMES-X10ENVRES-1996-0006 (Appendix B) was filed. The investigation team did not address the occurrence reporting or event notification process. The project personnel (project team) examined the physical evidence at Pit 1 ISV site (e.g., the ejected melt material and the ISV hood), reviewed documents such as the site- specific health and safety plan (HASP), and interviewed personnel involved in the event and/or the project. A listing of the personnel interviewed and evidence reviewed is provided in Appendix C.« less

  3. CloudSat Safety Operations at Vandenberg AFB

    NASA Technical Reports Server (NTRS)

    Greenberg, Steve

    2006-01-01

    CloudSat safety operations at Vendenberg AFB is given. The topics include: 1) CloudSat Project Overview; 2) Vandenberg Ground Operations; 3) Delta II Launch Vehicle; 4) The A-Train; 5) System Safety Management; 6) CALIPSO Hazards Assessment; 7) CALIPSO Supplemental Safeguards; 8) Joint System Safety Operations; 9) Extended Stand-down; 10) Launch Delay Safety Concerns; and 11) Lessons Learned.

  4. 75 FR 15484 - Railroad Safety Technology Program Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... governments for projects that have a public benefit of improved railroad safety and efficiency. The program... State and local governments for projects * * * that have a public benefit of improved safety and network... minimum 20 percent grantee cost share (cash or in-kind) match requirement. DATES: FRA will begin accepting...

  5. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  6. Interventions to reduce injuries among older workers in agriculture: A review of evaluated intervention projects.

    PubMed

    Nilsson, Kerstin

    2016-10-17

    The number of older workers is increasing throughout the industrialised world and older workers are known to be more frequent in the injury-prone agricultural sector. This paper sought to extend knowledge by reviewing evaluated intervention studies intended to decrease risks and work injuries among older workers in agriculture. A systematic literature review regarding: evaluated intervention projects on injury prevention, including participants aged 55 years and older, and working in agriculture. This review identified evaluated intervention projects regarding: i) intervention in injury prevention; ii) interventions to increase knowledge in health and safety tasks and practice; and iii) interventions to increase the use of safety equipment in work. The evaluations reviewed showed that the interventions were less successful in involving older agricultural workers than their younger counterparts. The evaluations also showed that the outcome of interventions was generally less positive or brought about no significant difference in risk awareness and behaviour change among older agricultural workers. Many articles and statistics describe injuries in agriculture. Especially older farm workers are one of the groups with most work injuries and deaths. Despite this, an important finding in this review was shortage of implemented and evaluated intervention studies orientated toward reduce injuries among older workers in agriculture. This review also found that no intervention project in the evaluations studied had a clear positive effect. Many intervention studies have problems with or lack of evaluation in the study design. Based on the results in this review, important future research tasks are to improve the design of interventions, devise implementation methods and formulate appropriate evaluation methods to measure the outcome of the interventions. Intervention programmes also need to involve older workers specific physical and cognitive age aspects in the design to

  7. Part-task vs. whole-task training on a supervisory control task

    NASA Technical Reports Server (NTRS)

    Battiste, Vernol

    1987-01-01

    The efficacy of a part-task training for the psychomotor portion of a supervisory control simulation was compared to that of the whole-task training, using six subjects in each group, who were asked to perform a task as quickly as possible. Part-task training was provided with the cursor-control device prior to transition to the whole-task. The analysis of both the training and experimental trials demonstrated a significant performance advantage for the part-task group: the tasks were performed better and at higher speed. Although the subjects finally achieved the same level of performance in terms of score, the part-task method was preferable for economic reasons, since simple pretraining systems are significantly less expensive than the whole-task training systems.

  8. Combating omission errors through task analysis and good reminders.

    PubMed

    Reason, J

    2002-03-01

    Leaving out necessary task steps is the single most common human error type. Certain task steps possess characteristics that are more likely to provoke omissions than others, and can be identified in advance. The paper reports two studies. The first, involving a simple photocopier, established that failing to remove the last page of the original is the commonest omission. This step possesses four distinct error-provoking features that combine their effects in an additive fashion. The second study examined the degree to which everyday memory aids satisfy five features of a good reminder: conspicuity, contiguity, content, context, and countability. A close correspondence was found between the percentage use of strategies and the degree to which they satisfied these five criteria. A three stage omission management programme was outlined: task analysis (identifying discrete task steps) of some safety critical activity; assessing the omission likelihood of each step; and the choice and application of a suitable reminder. Such a programme is applicable to a variety of healthcare procedures.

  9. Implementing Patient Safety Initiatives in Rural Hospitals

    ERIC Educational Resources Information Center

    Klingner, Jill; Moscovice, Ira; Tupper, Judith; Coburn, Andrew; Wakefield, Mary

    2009-01-01

    Implementation of patient safety initiatives can be costly in time and energy. Because of small volumes and limited resources, rural hospitals often are not included in nationally driven patient safety initiatives. This article describes the Tennessee Rural Hospital Patient Safety Demonstration project, whose goal was to strengthen capacity for…

  10. An Evaluation of Proposed School Safety Indicators for Georgia.

    ERIC Educational Resources Information Center

    Todd, Knox H.; Kellermann, Arthur L.; Wald, Marlena; Lipscomb, Leslie; Fajman, Nancy

    One of the tasks of the Council for School Performance is to implement measures of school safety to determine the impact of Georgia Lottery for Education expenditures. During the 1994-95 school year, the council pilot-tested several indicators of school safety. This document presents the results of an evaluation that examined the relevance,…

  11. Governor's Educational Summit Task Force Report.

    ERIC Educational Resources Information Center

    Michigan Governor's Office, Lansing.

    This booklet contains a series of potential educational goals for Michigan in 1985, prepared by a task force appointed by the governor. The selection of these goals was guided by three major considerations: programs likely to achieve progress within a year, projects directly affecting the classroom level, and goals with statewide effects. These…

  12. New safety rules challenge U. K. operators, regulators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hudson, J.

    1994-08-15

    Offshore safety regulations based on lessons learned from the Piper Alpha blast of 1988 have been in operation in the U.K. for a year. The Offshore Installations (Safety Case) Regulations 1992 make operators of fixed and mobile installations (the duty holders'') responsible for producing a formal safety assessment, or safety case, for each installation. After the end of November 1995 it will be an offense to operate an installation without a safety case which has been approved by the government's Health and Safety Executive (HSE). Producing safety cases for installations is a major task for duty holder, while assessing themmore » is a huge under taking for HSE's Offshore Safety Division (OSD). This paper reviews how HSE has established management arrangements to handle safety cases, considers progress in assessment, highlights some of the important lessons learned, and look to the future.« less

  13. Ensuring Payload Safety in Missions with Special Partnerships

    NASA Technical Reports Server (NTRS)

    Staubus, Calvert A.; Willenbring, Rachel C.; Blankenship, Michael D.

    2016-01-01

    The National Aeronautics and Space Administration (NASA) Expendable Launch Vehicle (ELV) payload space flight missions involve cooperative work between NASA and partners including spacecraft (or payload) contractors, universities, nonprofit research centers, Agency payload organization, Range Safety organization, Agency launch service organizations, and launch vehicle contractors. The role of NASA's Safety and Mission Assurance (SMA) Directorate is typically fairly straightforward, but when a mission's partnerships become more complex, to realize cost and science benefits (e.g., multi-agency payload(s) or cooperative international missions), the task of ensuring payload safety becomes much more challenging. This paper discusses lessons learned from NASA safety professionals working multiple-agency missions and offers suggestions to help fellow safety professionals working multiple-agency missions.

  14. Understanding the relationship between safety culture dimensions and safety performance of construction projects through partial least square method

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Machfudiyanto, Rossy A.; Arifuddin, Rosmariani; Yogiswara, Yoko

    2017-03-01

    Based on the data, 32% of accidental cases in Indonesia occurs on constructional sectors. It is supported by the data from Public Work and Housing Department that 27.43% of the implementation level of Safety Management System policy at construction companies in Indonesia remains unsafe categories. Moreover, there are dimensions of occupational safety culture formed including leadership, behavior, strategy, policy, process, people, safety cost, value and contract system. The aim of this study is to determine the model of an effective safety culture and know the relationship between dimensions in construction industry. The method used in this research was questionnaire survey which was distributed to the sample of construction companies either in a national private one in Indonesia. The result of this research is supposed to be able to illustrate the development of the relationship among occupational safety culture dimensions which have influences to the performances of constructional companies in Indonesia.

  15. 23 CFR 635.108 - Health and safety.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Health and safety. 635.108 Section 635.108 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.108 Health and safety. Contracts for projects shall... laws governing safety, health and sanitation; and (b) To require that the contractor shall provide all...

  16. 23 CFR 635.108 - Health and safety.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Health and safety. 635.108 Section 635.108 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.108 Health and safety. Contracts for projects shall... laws governing safety, health and sanitation; and (b) To require that the contractor shall provide all...

  17. 23 CFR 635.108 - Health and safety.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Health and safety. 635.108 Section 635.108 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.108 Health and safety. Contracts for projects shall... laws governing safety, health and sanitation; and (b) To require that the contractor shall provide all...

  18. 23 CFR 635.108 - Health and safety.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Health and safety. 635.108 Section 635.108 Highways... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.108 Health and safety. Contracts for projects shall... laws governing safety, health and sanitation; and (b) To require that the contractor shall provide all...

  19. Production practices affecting worker task demands in concrete operations: A case study.

    PubMed

    Memarian, Babak; Mitropoulos, Panagiotis

    2015-01-01

    Construction work involves significant physical, mental, and temporal task demands. Excessive task demands can have negative consequences for safety, errors and production. This exploratory study investigates the magnitude and sources of task demands on a concrete operation, and examines the effect of the production practices on the workers' task demands. The NASA Task Load Index was used to measure the perceived task demands of two work crews. The operation involved the construction of a cast-in-place concrete building under high schedule pressures. Interviews with each crew member were used to identify the main sources of the perceived demands. Extensive field observations and interviews with the supervisors and crews identified the production practices. The workers perceived different level of task demands depending on their role. The production practices influenced the task demands in two ways: (1) practices related to work organization, task design, resource management, and crew management mitigated the task demands; and (2) other practices related to work planning and crew management increased the crew's ability to cope with and adapt to high task demands. The findings identify production practices that regulate the workers' task demands. The effect of task demands on performance is mitigated by the ability to cope with high demands.

  20. Fact book : statistical information on highway safety

    DOT National Transportation Integrated Search

    1979-06-01

    The Congress has charged the Department of Transportation with the task of achieving a reduction in traffic accidents and their resulting deaths and injuries. The National Highway Traffic Safety Administration (NHTSA) is the Departmental agency which...

  1. Integrating Safety and Mission Assurance in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safety and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  2. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites

    PubMed Central

    Sparer, Emily; Dennerlein, Jack

    2017-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness. PMID:28638178

  3. Safety performance functions.

    DOT National Transportation Integrated Search

    2014-10-01

    This project developed safety performance functions for roadway segments and intersections for two-lane rural highways in : Pennsylvania. The statistical modeling methodology was consistent with that used in the first edition of the American : Associ...

  4. Involvement of the anterior cingulate cortex in time-based prospective memory task monitoring: An EEG analysis of brain sources using Independent Component and Measure Projection Analysis

    PubMed Central

    Burgos, Pablo; Kilborn, Kerry; Evans, Jonathan J.

    2017-01-01

    Objective Time-based prospective memory (PM), remembering to do something at a particular moment in the future, is considered to depend upon self-initiated strategic monitoring, involving a retrieval mode (sustained maintenance of the intention) plus target checking (intermittent time checks). The present experiment was designed to explore what brain regions and brain activity are associated with these components of strategic monitoring in time-based PM tasks. Method 24 participants were asked to reset a clock every four minutes, while performing a foreground ongoing word categorisation task. EEG activity was recorded and data were decomposed into source-resolved activity using Independent Component Analysis. Common brain regions across participants, associated with retrieval mode and target checking, were found using Measure Projection Analysis. Results Participants decreased their performance on the ongoing task when concurrently performed with the time-based PM task, reflecting an active retrieval mode that relied on withdrawal of limited resources from the ongoing task. Brain activity, with its source in or near the anterior cingulate cortex (ACC), showed changes associated with an active retrieval mode including greater negative ERP deflections, decreased theta synchronization, and increased alpha suppression for events locked to the ongoing task while maintaining a time-based intention. Activity in the ACC was also associated with time-checks and found consistently across participants; however, we did not find an association with time perception processing per se. Conclusion The involvement of the ACC in both aspects of time-based PM monitoring may be related to different functions that have been attributed to it: strategic control of attention during the retrieval mode (distributing attentional resources between the ongoing task and the time-based task) and anticipatory/decision making processing associated with clock-checks. PMID:28863146

  5. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  6. Identification of Tasks in Home Economics Related Occupations: Food Service.

    ERIC Educational Resources Information Center

    Iowa State Univ. of Science and Technology, Ames. Dept. of Home Economics Education.

    The study was made to obtain curriculum development data for food service education programs below the baccalaureate level. Tasks related to the job functions of service, production, sanitation/safety, menu planning, procurement, supervision, and management were studied for five job categories of full-time personnel: middle-level service,…

  7. ASDS Guidelines Task Force: Consensus Recommendations Regarding the Safety of Lasers, Dermabrasion, Chemical Peels, Energy Devices, and Skin Surgery During and After Isotretinoin Use.

    PubMed

    Waldman, Abigail; Bolotin, Diana; Arndt, Kenneth A; Dover, Jeffrey S; Geronemus, Roy G; Chapas, Anne; Iyengar, Sanjana; Kilmer, Suzanne L; Krakowski, Andrew C; Lawrence, Naomi; Prather, Heidi B; Rohrer, Thomas E; Schlosser, Bethanee J; Kim, John Y S; Shumaker, Peter R; Spring, Leah K; Alam, Murad

    2017-10-01

    Currently, the isotretinoin (13-cis-retinoic acid) package insert contains language advising the discontinuation of isotretinoin for 6 months before performing cosmetic procedures, including waxing, dermabrasion, chemical peels, laser procedures, or incisional and excisional cold-steel surgery. It is common practice to follow this standard because of concerns regarding reports of sporadic adverse events and increased risk of scarring. To develop expert consensus regarding the safety of skin procedures, including resurfacing, energy device treatments, and incisional and excisional procedures, in the setting of concurrent or recent isotretinoin use. The American Society for Dermatologic Surgery authorized a task force of content experts to review the evidence and provide guidance. First, data were extracted from the literature. This was followed by a clinical question review, a consensus Delphi process, and validation of the results by peer review. The task force concluded that there is insufficient evidence to justify delaying treatment with superficial chemical peels and nonablative lasers, including hair removal lasers and lights, vascular lasers, and nonablative fractional devices for patients currently or recently exposed to isotretinoin. Superficial and focal dermabrasion may also be safe when performed by a well-trained clinician.

  8. Task-relevant output signals are sent from monkey dorsolateral prefrontal cortex to the superior colliculus during a visuospatial working memory task.

    PubMed

    Johnston, Kevin; Everling, Stefan

    2009-05-01

    Visuospatial working memory is one of the most extensively investigated functions of the dorsolateral prefrontal cortex (DLPFC). Theories of prefrontal cortical function have suggested that this area exerts cognitive control by modulating the activity of structures to which it is connected. Here, we used the oculomotor system as a model in which to characterize the output signals sent from the DLPFC to a target structure during a classical spatial working memory task. We recorded the activity of identified DLPFC-superior colliculus (SC) projection neurons while monkeys performed a memory-guided saccade task in which they were required to generate saccades toward remembered stimulus locations. DLPFC neurons sent signals related to all aspects of the task to the SC, some of which were spatially tuned. These data provide the first direct evidence that the DLPFC sends task-relevant information to the SC during a spatial working memory task, and further support a role for the DLPFC in the direct modulation of other brain areas.

  9. HIGH PRESSURE COAL COMBUSTION KINETICS PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chris Guenther; Bill Rogers

    2001-09-15

    The HPCCK project was initiated with a kickoff meeting held on June 12, 2001 in Morgantown, WV, which was attended by all project participants. SRI's existing g-RCFR reactor was reconfigured to a SRT-RCFR geometry (Task 1.1). This new design is suitable for performing the NBFZ experiments of Task 1.2. It was decided that the SRT-RCFR apparatus could be modified and used for the HPBO experiments. The purchase, assembly, and testing of required instrumentation and hardware is nearly complete (Task 1.1 and 1.2). Initial samples of PBR coal have been shipped from FWC to SRI (Task 1.1). The ECT device formore » coal flow measurements used at FWC will not be used in the SRI apparatus and a screw type feeder has been suggested instead (Task 5.1). NEA has completed a upgrade of an existing Fluent simulator for SRI's RCFR to a version that is suitable for interpreting results from tests in the NBFZ configuration (Task 1.3) this upgrade includes finite-rate submodels for devolatilization, secondary volatiles pyrolysis, volatiles combustion, and char oxidation. Plans for an enhanced version of CBK have been discussed and development of this enhanced version has begun (Task 2.5). A developmental framework for implementing pressure and oxygen effects on ash formation in an ash formation model (Task 3.3) has begun.« less

  10. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  11. Report of the Interagency Task Force on Carbon Capture and Storage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2010-08-01

    Carbon capture and storage (CCS) refers to a set of technologies that can greatly reduce carbon dioxide (CO{sub 2}) emissions from new and existing coal- and gas-fired power plants, industrial processes, and other stationary sources of CO{sub 2}. In its application to electricity generation, CCS could play an important role in achieving national and global greenhouse gas (GHG) reduction goals. However, widespread cost-effective deployment of CCS will occur only if the technology is commercially available and a supportive national policy framework is in place. In keeping with that objective, on February 3, 2010, President Obama established an Interagency Task Forcemore » on Carbon Capture and Storage composed of 14 Executive Departments and Federal Agencies. The Task Force, co-chaired by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), was charged with proposing a plan to overcome the barriers to the widespread, cost-effective deployment of CCS within ten years, with a goal of bringing five to ten commercial demonstration projects online by 2016. Composed of more than 100 Federal employees, the Task Force examined challenges facing early CCS projects as well as factors that could inhibit widespread commercial deployment of CCS. In developing the findings and recommendations outlined in this report, the Task Force relied on published literature and individual input from more than 100 experts and stakeholders, as well as public comments submitted to the Task Force. The Task Force also held a large public meeting and several targeted stakeholder briefings. While CCS can be applied to a variety of stationary sources of CO{sub 2}, its application to coal-fired power plant emissions offers the greatest potential for GHG reductions. Coal has served as an important domestic source of reliable, affordable energy for decades, and the coal industry has provided stable and quality high-paying jobs for American workers. At the same time, coal

  12. Introduction to SIMRAND: Simulation of research and development project

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1982-01-01

    SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

  13. Heuristics in Managing Complex Clinical Decision Tasks in Experts’ Decision Making

    PubMed Central

    Islam, Roosan; Weir, Charlene; Del Fiol, Guilherme

    2016-01-01

    Background Clinical decision support is a tool to help experts make optimal and efficient decisions. However, little is known about the high level of abstractions in the thinking process for the experts. Objective The objective of the study is to understand how clinicians manage complexity while dealing with complex clinical decision tasks. Method After approval from the Institutional Review Board (IRB), three clinical experts were interviewed the transcripts from these interviews were analyzed. Results We found five broad categories of strategies by experts for managing complex clinical decision tasks: decision conflict, mental projection, decision trade-offs, managing uncertainty and generating rule of thumb. Conclusion Complexity is created by decision conflicts, mental projection, limited options and treatment uncertainty. Experts cope with complexity in a variety of ways, including using efficient and fast decision strategies to simplify complex decision tasks, mentally simulating outcomes and focusing on only the most relevant information. Application Understanding complex decision making processes can help design allocation based on the complexity of task for clinical decision support design. PMID:27275019

  14. Effectiveness of high school safety belt instruction

    DOT National Transportation Integrated Search

    1982-12-01

    The Effectiveness of High School Safety Belt Instruction was developed during a two-phased project. In Phase I, Focus Group Activities were conducted to determine whether audiovisual safety belt instructional materials assembled by the National Highw...

  15. Improved Safety Margin Characterization of Risk from Loss of Offsite Power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Paul

    Original intent: The original intent of this task was “support of the Risk-Informed Safety Margin Characteristic (RISMC) methodology in order” “to address … efficiency of computation so that more accurate and cost-effective techniques can be used to address safety margin characterizations” (S. M. Hess et al., “Risk-Informed Safety Margin Characterization,” Procs. ICONE17, Brussels, July 2009, CD format). It was intended that “in Task 1 itself this improvement will be directed toward upon the very important issue of Loss of Offsite Power (LOOP) events,” more specifically toward the challenge of efficient computation of the multidimensional nonrecovery integral that has been discussedmore » by many previous contributors to the theory of nuclear safety. It was further envisioned that “three different computational approaches will be explored,” corresponding to the three subtasks listed below; deliverables were tied to the individual subtasks.« less

  16. The Stanford how things work project

    NASA Technical Reports Server (NTRS)

    Fikes, Richard; Gruber, Tom; Iwasaki, Yumi

    1994-01-01

    We provide an overview of the Stanford How Things Work (HTW) project, an ongoing integrated collection of research activities in the Knowledge Systems Laboratory at Stanford University. The project is developing technology for representing knowledge about engineered devices in a form that enables the knowledge to be used in multiple systems for multiple reasoning tasks and reasoning methods that enable the represented knowledge to be effectively applied to the performance of the core engineering task of simulating and analyzing device behavior. The central new capabilities currently being developed in the project are automated assistance with model formulation and with verification that a design for an electro-mechanical device satisfies its functional specification.

  17. Ares Project Overview - Quality in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  18. Models Extracted from Text for System-Software Safety Analyses

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.

    2010-01-01

    This presentation describes extraction and integration of requirements information and safety information in visualizations to support early review of completeness, correctness, and consistency of lengthy and diverse system safety analyses. Software tools have been developed and extended to perform the following tasks: 1) extract model parts and safety information from text in interface requirements documents, failure modes and effects analyses and hazard reports; 2) map and integrate the information to develop system architecture models and visualizations for safety analysts; and 3) provide model output to support virtual system integration testing. This presentation illustrates the methods and products with a rocket motor initiation case.

  19. Providing Nuclear Criticality Safety Analysis Education through Benchmark Experiment Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John D. Bess; J. Blair Briggs; David W. Nigg

    2009-11-01

    One of the challenges that today's new workforce of nuclear criticality safety engineers face is the opportunity to provide assessment of nuclear systems and establish safety guidelines without having received significant experience or hands-on training prior to graduation. Participation in the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and/or the International Reactor Physics Experiment Evaluation Project (IRPhEP) provides students and young professionals the opportunity to gain experience and enhance critical engineering skills.

  20. Reverse control for humanoid robot task recognition.

    PubMed

    Hak, Sovannara; Mansard, Nicolas; Stasse, Olivier; Laumond, Jean Paul

    2012-12-01

    Efficient methods to perform motion recognition have been developed using statistical tools. Those methods rely on primitive learning in a suitable space, for example, the latent space of the joint angle and/or adequate task spaces. Learned primitives are often sequential: A motion is segmented according to the time axis. When working with a humanoid robot, a motion can be decomposed into parallel subtasks. For example, in a waiter scenario, the robot has to keep some plates horizontal with one of its arms while placing a plate on the table with its free hand. Recognition can thus not be limited to one task per consecutive segment of time. The method presented in this paper takes advantage of the knowledge of what tasks the robot is able to do and how the motion is generated from this set of known controllers, to perform a reverse engineering of an observed motion. This analysis is intended to recognize parallel tasks that have been used to generate a motion. The method relies on the task-function formalism and the projection operation into the null space of a task to decouple the controllers. The approach is successfully applied on a real robot to disambiguate motion in different scenarios where two motions look similar but have different purposes.

  1. Goal orientation, perceived task outcome and task demands in mathematics tasks: effects on students' attitude in actual task settings.

    PubMed

    Seegers, Gerard; van Putten, Cornelis M; de Brabander, Cornelis J

    2002-09-01

    In earlier studies, it has been found that students' domain-specific cognitions and personal learning goals (goal orientation) influence task-specific appraisals of actual learning tasks. The relations between domain-specific and task-specific variables have been specified in the model of adaptive learning. In this study, additional influences, i.e., perceived task outcome on a former occasion and variations in task demands, were investigated. The purpose of this study was to identify personality and situational variables that mediate students' attitude when confronted with a mathematics task. Students worked on a mathematics task in two subsequent sessions. Effects of perceived task outcome at the first session on students' attitude at the second session were investigated. In addition, we investigated how differences in task demands influenced students' attitude. Variations in task demands were provoked by different conditions in task-instruction. In one condition, students were told that the result on the test would add to their mark on mathematics. This outcome orienting condition was contrasted with a task-orienting condition where students were told that the results on the test would not be used to give individual grades. Participants were sixth grade students (N = 345; aged 11-12 years) from 14 primary schools. Multivariate and univariate analyses of (co)variance were applied to the data. Independent variables were goal orientation, task demands, and perceived task outcome, with task-specific variables (estimated competence for the task, task attraction, task relevance, and willingness to invest effort) as the dependent variables. The results showed that previous perceived task outcome had a substantial impact on students' attitude. Additional but smaller effects were found for variation in task demands. Furthermore, effects of previous perceived task outcome and task demands were related to goal orientation. The resulting pattern confirmed that, in general

  2. The Fort McMurray Demonstration Project in social marketing: health- and safety-related behaviour among oil sands workers.

    PubMed

    Guidotti, T L; Watson, L; Wheeler, M; Jhangri, G S

    1996-08-01

    This is the first round in a series of surveys conducted in Fort McMurray as part of the Fort McMurray Demonstration Project in social marketing. This component of the survey was intended to focus on the most prominent group of employed workers in the community and to compare their patterns of response with the community as a whole. Respondents to the survey were overwhelmingly male (96%), married (72.9%) and living in households of two to five persons (87.9%). They were predominantly aged 30-44 (55%) and graduates of high school (53.5%). Younger male workers (below age 30) were more likely to have a high school diploma (78.3%) or some additional technical or vocational training (21.7% compared to 12.5% overall) and to be unmarried or separated. Attitudes toward safety-related behaviours were stronger than for respondents from the community as a whole. Approximately 70-100% of all age groups and both sexes showed strong agreement with attitudes involving child car seats and the unacceptability of drinking and driving. These attitudes include strong advocacy of vigorous enforcement of occupational health and safety standards. However, they showed a variability similar to the community as a whole in behaviour at home compared to work, generally reporting more consistent use of personal protection on the job than in their own homes, particularly hearing protection. Even so, they were much less likely to perform stretching and warm-up exercises prior to exertion than community residents in general. The potential may exist to transfer the technology and attitudes from workplace health and safety to community safety. One possible strategy to accomplish this is to involve workers in this industry directly in community initiatives. This strategy may be generalizable to any community in which there are major employers who place a heavy emphasis on risk control and occupational health and safety.

  3. Connected commercial vehicles — retrofit safety device kit project : final report.

    DOT National Transportation Integrated Search

    2014-03-01

    Connected vehicle wireless data communications can enable safety applications that may reduce injuries and fatalities. Cooperative vehicle-to-vehicle (V2V) safety applications will be effective only if a high fraction of vehicles are equipped. Deploy...

  4. Task automation in a successful industrial telerobot

    NASA Technical Reports Server (NTRS)

    Spelt, Philip F.; Jones, Sammy L.

    1994-01-01

    In this paper, we discuss cooperative work by Oak Ridge National Laboratory and Remotec, Inc., to automate components of the operator's workload using Remotec's Andros telerobot, thereby providing an enhanced user interface which can be retrofit to existing fielded units as well as being incorporated into new production units. Remotec's Andros robots are presently used by numerous electric utilities to perform tasks in reactors where substantial exposure to radiation exists, as well as by the armed forces and numerous law enforcement agencies. The automation of task components, as well as the video graphics display of the robot's position in the environment, will enhance all tasks performed by these users, as well as enabling performance in terrain where the robots cannot presently perform due to lack of knowledge about, for instance, the degree of tilt of the robot. Enhanced performance of a successful industrial mobile robot leads to increased safety and efficiency of performance in hazardous environments. The addition of these capabilities will greatly enhance the utility of the robot, as well as its marketability.

  5. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  6. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  7. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  8. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  9. 23 CFR 630.1010 - Significant projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Significant projects. 630.1010 Section 630.1010 Highways... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1010 Significant projects. (a) A significant project is one that, alone or in combination with other concurrent projects nearby is anticipated to cause...

  10. Report from Middle-Earth: Fan Fiction Tasks in the EFL Classroom

    ERIC Educational Resources Information Center

    Sauro, Shannon; Sundmark, Björn

    2016-01-01

    This study builds upon work in task-based language teaching and literary studies to explore the use of fan fiction as a pedagogical tool in a technology-enhanced university foreign language class. A task-based fan fiction project, The Blogging Hobbit, modelled on blog-based role-play storytelling found in online media fandoms, was carried out in a…

  11. Safety belt use estimate for Native American tribal reservations

    DOT National Transportation Integrated Search

    2005-10-01

    The National Highway Traffic Safety Administration (NHTSA) and the Bureau of Indian Affairs (BIA), Indian Highway Safety Program, sponsored a project to (a) establish the first baseline tribal reservation safety belt use rate, and (b) develop a metho...

  12. Energy Storage Project

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Jankovsky, Amy L.; Reid, Concha M.; Miller, Thomas B.; Hoberecht, Mark A.

    2011-01-01

    NASA's Exploration Technology Development Program funded the Energy Storage Project to develop battery and fuel cell technology to meet the expected energy storage needs of the Constellation Program for human exploration. Technology needs were determined by architecture studies and risk assessments conducted by the Constellation Program, focused on a mission for a long-duration lunar outpost. Critical energy storage needs were identified as batteries for EVA suits, surface mobility systems, and a lander ascent stage; fuel cells for the lander and mobility systems; and a regenerative fuel cell for surface power. To address these needs, the Energy Storage Project developed advanced lithium-ion battery technology, targeting cell-level safety and very high specific energy and energy density. Key accomplishments include the development of silicon composite anodes, lithiated-mixed-metal-oxide cathodes, low-flammability electrolytes, and cell-incorporated safety devices that promise to substantially improve battery performance while providing a high level of safety. The project also developed "non-flow-through" proton-exchange-membrane fuel cell stacks. The primary advantage of this technology set is the reduction of ancillary parts in the balance-of-plant--fewer pumps, separators and related components should result in fewer failure modes and hence a higher probability of achieving very reliable operation, and reduced parasitic power losses enable smaller reactant tanks and therefore systems with lower mass and volume. Key accomplishments include the fabrication and testing of several robust, small-scale nonflow-through fuel cell stacks that have demonstrated proof-of-concept. This report summarizes the project s goals, objectives, technical accomplishments, and risk assessments. A bibliography spanning the life of the project is also included.

  13. Road safety enhancement: an investigation on the visibility of on-road image projections using DMD-based pixel light systems

    NASA Astrophysics Data System (ADS)

    Rizvi, Sadiq; Ley, Peer-Phillip; Knöchelmann, Marvin; Lachmayer, Roland

    2018-02-01

    Research reveals that visual information forms the major portion of the received data for driving. At night -owing to the, sometimes scarcity, sometime inhomogeneity of light- the human physiology and psychology experiences a dramatic alteration. It is found that although the likelihood of accident occurrence is higher during the day due to heavier traffic, the most fatal accidents still occur during night time. How can road safety be improved in limited lighting conditions using DMD-based high resolution headlamps? DMD-based pixel light systems, utilizing HID and LED light sources, are able to address hundreds of thousands of pixels individually. Using camera information, this capability allows 'glare-free' light distributions that perfectly adapt to the needs of all road users. What really enables these systems to stand out however, is their on-road image projection capability. This projection functionality may be used in co-operation with other driver assistance systems as an assist feature for the projection of navigation data, warning signs, car status information etc. Since contrast sensitivity constitutes a decisive measure of the human visual function, here is then a core question: what distributions of luminance in the projection space produce highly visible on-road image projections? This work seeks to address this question. Responses on sets of differently illuminated projections are collected from a group of participants and later interpreted using statistical data obtained using a luminance camera. Some aspects regarding the correlation between contrast ratio, symbol form and attention capture are also discussed.

  14. Introduction to LNG vehicle safety

    NASA Astrophysics Data System (ADS)

    Bratvold, Delma; Friedman, David; Chernoff, Harry; Farkhondehpay, Dariush; Comay, Claudia

    1994-03-01

    Basic information on the characteristics of liquefied natural gas (LNG) is assembled to provide an overview of safety issues and practices for the use of LNG vehicles. This document is intended for those planning or considering the use of LNG vehicles, including vehicle fleet owners and operators, public transit officials and boards, local fire and safety officials, manufacturers and distributors, and gas industry officials. Safety issues and mitigation measures that should be considered for candidate LNG vehicle projects are addressed.

  15. Cooperative Projects - Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja

    2017-04-01

    Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned

  16. Federal and tribal lands road safety audits : case studies

    DOT National Transportation Integrated Search

    2009-12-01

    A road safety audit (RSA) is a formal safety performance examination by an independent, multidisciplinary team. RSAs are an effective tool for proactively improving the safety performance of a road project during the planning and design stages, and f...

  17. Chernobyl Studies Project: Working group 7.0, Environmental transport and health effects. Progress report, March--September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anspaugh, L.R.; Hendrickson, S.M.

    1994-12-01

    In April 1988, the US and the former-USSR signed a Memorandum of Cooperation (MOC) for Civilian Nuclear Reactor Safety; this MOC was a direct result of the accident at the Chernobyl Nuclear Power Plant Unit 4 and the following efforts by the two countries to implement a joint program to improve the safety of nuclear power plants and to understand the implications of environmental releases. A Joint Coordinating Committee for Civilian Nuclear Reactor Safety (JCCCNRS) was formed to implement the MOC. The JCCCNRS established many working groups; most of these were the responsibility of the Nuclear Regulatory Commission, as farmore » as the US participation was concerned. The lone exception was Working Group 7 on Environmental Transport and Health Effects, for which the US participation was the responsibility of the US Department of Energy (DOE). The purpose of Working Group 7 was succintly stated to be, ``To develop jointly methods to project rapidly the health effects of any future nuclear reactor accident.`` To implement the work DOE then formed two subworking groups: 7.1 to address Environmental Transport and 7.2 to address Health Effects. Thus, the DOE-funded Chernobyl Studies Project began. The majority of the initial tasks for this project are completed or near completion. The focus is now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are currently working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.« less

  18. Evaluation of Safety, Quality and Productivity in Construction

    NASA Astrophysics Data System (ADS)

    Usmen, M. A.; Vilnitis, M.

    2015-11-01

    This paper examines the success indicators of construction projects, safety, quality and productivity, in terms of their implications and impacts during and after construction. First safety is considered during construction with a focus on hazard identification and the prevention of occupational accidents and injuries on worksites. The legislation mandating safety programs, training and compliance with safety standards is presented and discussed. Consideration of safety at the design stage is emphasized. Building safety and the roles of building codes in prevention of structural failures are also covered in the paper together with factors affecting building failures and methods for their prevention. Quality is introduced in the paper from the perspective of modern total quality management. Concepts of quality management, quality control, quality assurance and Six Sigma and how they relate to building quality and structural integrity are discussed with examples. Finally, productivity concepts are presented with emphasis on effective project management to minimize loss of productivity, complimented by lean construction and lean Six Sigma principles. The paper concludes by synthesizing the relationships between safety, quality and productivity.

  19. Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gary Blythe; MariJon Owens

    2007-12-01

    This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulkmore » solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves

  20. Chasing the silver bullet: measuring driver fatigue using simple and complex tasks.

    PubMed

    Baulk, S D; Biggs, S N; Reid, K J; van den Heuvel, C J; Dawson, D

    2008-01-01

    Driver fatigue remains a significant cause of motor-vehicle accidents worldwide. New technologies are increasingly utilised to improve road safety, but there are no effective on-road measures for fatigue. While simulated driving tasks are sensitive, and simple performance tasks have been used in industrial fatigue management systems (FMS) to quantify risk, little is known about the relationship between such measures. Establishing a simple, on-road measure of fatigue, as a fitness-to-drive tool, is an important issue for road safety and accident prevention, particularly as many fatigue related accidents are preventable. This study aimed to measure fatigue-related performance decrements using a simple task (reaction time - RT) and a complex task (driving simulation), and to determine the potential for a link between such measures, thus improving FMS success. Fifteen volunteer participants (7 m, 8 f) aged 22-56 years (mean 33.6 years), underwent 26 h of supervised wakefulness before an 8h recovery sleep opportunity. Participants were tested using a 30-min interactive driving simulation test, bracketed by a 10-min psychomotor vigilance task (PVT) at 4, 8, 18 and 24h of wakefulness, and following recovery sleep. Extended wakefulness caused significant decrements in PVT and driving performance. Although these measures are clearly linked, our analyses suggest that driving simulation cannot be replaced by a simple PVT. Further research is needed to closely examine links between performance measures, and to facilitate accurate management of fitness to drive, which requires more complex assessments of performance than RT alone.

  1. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  2. Composite Overwrapped Pressure Vessels: Database Extension Task 3.0 and Impact Damage Effects Control Task 8.0

    NASA Technical Reports Server (NTRS)

    Beeson, Harold D.; Davis, Dennis D.; Ross, William L., Sr.; Tapphorn, Ralph M.

    2002-01-01

    This document represents efforts accomplished at the NASA Johnson Space Center White Sands Test Facility (WSTF) in support of the Enhanced Technology for Composite Overwrapped Pressure Vessels (COPV) Program, a joint research and technology effort among the U.S. Air Force, NASA, and the Aerospace Corporation. WSTF performed testing for several facets of the program. Testing that contributed to the Task 3.0 COPV database extension objective included baseline structural strength, failure mode and safe-life, impact damage tolerance, sustained load/impact effect, and materials compatibility. WSTF was also responsible for establishing impact protection and control requirements under Task 8.0 of the program. This included developing a methodology for establishing an impact control plan. Seven test reports detail the work done at WSTF. As such, this document contributes to the database of information regarding COPV behavior that will ensure performance benefits and safety are maintained throughout vessel service life.

  3. Connected commercial vehicles — retrofit safety device kit project : safety applications performance and functional test plan and procedure.

    DOT National Transportation Integrated Search

    2014-03-01

    Connected vehicle wireless data communications can enable safety applications that may reduce injuries and fatalities. Cooperative vehicle-to-vehicle (V2V) safety applications will be effective only if a high fraction of vehicles are equipped. Deploy...

  4. Preliminary Results Obtained in Integrated Safety Analysis of NASA Aviation Safety Program Technologies

    NASA Technical Reports Server (NTRS)

    Reveley, Mary S.

    2003-01-01

    The goal of the NASA Aviation Safety Program (AvSP) is to develop and demonstrate technologies that contribute to a reduction in the aviation fatal accident rate by a factor of 5 by the year 2007 and by a factor of 10 by the year 2022. Integrated safety analysis of day-to-day operations and risks within those operations will provide an understanding of the Aviation Safety Program portfolio. Safety benefits analyses are currently being conducted. Preliminary results for the Synthetic Vision Systems (SVS) and Weather Accident Prevention (WxAP) projects of the AvSP have been completed by the Logistics Management Institute under a contract with the NASA Glenn Research Center. These analyses include both a reliability analysis and a computer simulation model. The integrated safety analysis method comprises two principal components: a reliability model and a simulation model. In the reliability model, the results indicate how different technologies and systems will perform in normal, degraded, and failed modes of operation. In the simulation, an operational scenario is modeled. The primary purpose of the SVS project is to improve safety by providing visual-flightlike situation awareness during instrument conditions. The current analyses are an estimate of the benefits of SVS in avoiding controlled flight into terrain. The scenario modeled has an aircraft flying directly toward a terrain feature. When the flight crew determines that the aircraft is headed toward an obstruction, the aircraft executes a level turn at speed. The simulation is ended when the aircraft completes the turn.

  5. JV Task 120 - Coal Ash Resources Research Consortium Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debra Pflughoeft-Hassett; Loreal Heebink; David Hassett

    2009-03-28

    The Coal Ash Resources Research Consortium{reg_sign} (CARRC{reg_sign}, pronounced 'cars') is the core coal combustion product (CCP) research group at the Energy & Environmental Research Center (EERC). CARRC focuses on performing fundamental and applied scientific and engineering research emphasizing the environmentally safe, economical use of CCPs. CARRC member organizations, which include utilities and marketers, are key to developing industry-driven research in the area of CCP utilization and ensuring its successful application. The U.S. Department of Energy is a partner in CARRC through the EERC Jointly Sponsored Research Program, which provides matching funds for industrial member contributions and facilitates an increased levelmore » of effort in CARRC. CARRC tasks were designed to provide information on CCP performance, including environmental performance, engineering performance, favorable economics, and improved life cycle of products and projects. CARRC technical research tasks are developed based on member input and prioritization. CARRC special projects are developed with members and nonmembers to provide similar information and to support activities, including the assembly and interpretation of data, support for standards development and technology transfer, and facilitating product development and testing. CARRC activities from 2007 to 2009 included a range of research tasks, with primary work performed in laboratory tasks developed to answer specific questions or evaluate important fundamental properties of CCPs. The tasks were included in four categories: (1) Environmental Evaluations of CCPs; (2) Evaluation of Impacts on CCPs from Emission Controls; (3) Construction and Product-Related Activities; and (4) Technology Transfer and Maintenance Tasks. All tasks are designed to work toward achieving the CARRC overall goal and supporting objectives. The various tasks are coordinated in order to provide broad and useful technical data for CARRC members

  6. Beryllium Health and Safety Committee Data Reporting Task Force White Paper #2 -- Uses of Uncensored Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacQueen, D H

    2007-10-10

    the statistical comparisons described in the TS could be better implemented if analytical results, even when below a reporting limit, were to be reported by analytical laboratories. See Appendix 1 for a review of terminology related to reporting limits. The Beryllium Health and Safety Committee (BHSC) formed a Sampling and Analysis Subcommittee (SAS) in 2003. The SAS established a working group on accreditation and reporting limits. By 2006 it had become evident that the issues extended to data reporting as a whole. The SAS proposed to the BHSC the formation of a Data Reporting Task Force (DRTF) to consider issues related to data reporting. The BHSC Board agreed, and requested that the DRTF generate a white paper, to be offered by the BHSC to potential interested parties such as the DOE policy office that is responsible for beryllium health and safety policy. It was noted that additional products could include detailed guidance and potentially a journal article in the future. The SAS proposed that DRTF membership represent the affected disciplines (chemists, industrial hygiene professionals and statisticians, and the DOE office that is responsible for beryllium health and safety policy). The BHSC Board decided that DRTF membership should come from DOE sites, since the focus would be on reporting in the context of the TS and the Rule. The DRTF came into existence in late 2006. The DRTF membership includes industrial hygienists, analytical chemists and laboratory managers, members of the regulatory and oversight community, and environmental statisticians. A first White Paper, ''Summary of Issues and Path Forward'', was reviewed by the BHSC in March 2007 and issued by the DRTF in June 2007. It describes the charter of the DRTF, introduces some basic terminology (reproduced here in Appendix 1), lays out the issues the DRTF is expected to address, and describes a path forward for the DRTF's work. This first White Paper is available through the BHSC web site. This White

  7. Examination of the Occupational Health and Safety Initiatives Available within the Chemistry Departments of Australian Universities

    NASA Astrophysics Data System (ADS)

    Goodwin, Veronica; Cobbin, Deirdre; Logan, Peter

    1999-09-01

    This paper reports the findings of a survey that was conducted in 1996 of all Australian university chemistry departments. Thirty-one of the 33 chemistry departments provided input to the project. The aims were twofold: first, to ascertain how different departments approach the task of occupational health and safety (OHS) education and training for students and staff; and second, to produce a resource document that describes the techniques used by the various departments. A key issue identified in the study is the importance of ensuring that academic staff are kept up to date on all relevant aspects of OHS and laboratory safety. This is crucial because teaching staff are responsible for instructing their undergraduate and postgraduate students in OHS knowledge and practice. In addition, the study found that adequate funding and departmental commitment are necessary for the success of OHS and laboratory safety programs. The resource document should assist in promoting quality OHS knowledge and awareness in the academic chemistry laboratory, since it will provide chemistry departments with a wide range of OHS educational initiatives from which they can select the most appropriate for their own needs.

  8. Developing a Practical and Sustainable Faculty Development Program With a Focus on Teaching Quality Improvement and Patient Safety: An Alliance for Independent Academic Medical Centers National Initiative III Project.

    PubMed

    Rodrigue, Christopher; Seoane, Leonardo; Gala, Rajiv B; Piazza, Janice; Amedee, Ronald G

    2012-01-01

    Teaching the next generation of physicians requires more than traditional teaching models. The Accreditation Council for Graduate Medical Education's Next Accreditation System places considerable emphasis on developing a learning environment that fosters resident education in quality improvement and patient safety. The goal of this project was to develop a comprehensive and sustainable faculty development program with a focus on teaching quality improvement and patient safety. A multidisciplinary team representing all stakeholders in graduate medical education developed a validated survey to assess faculty and house officer baseline perceptions of their experience with faculty development opportunities, quality improvement tools and training, and resident participation in quality improvement and patient safety programs at our institution. We then developed a curriculum to address these 3 areas. Our pilot survey revealed a need for a comprehensive program to teach faculty and residents the art of teaching. Two other areas of need are (1) regular resident participation in quality improvement and patient safety efforts and (2) effective tools for developing skills and habits to analyze practices using quality improvement methods. Resident and faculty pairs in 17 Ochsner training programs developed and began quality improvement projects while completing the first learning module. Resident and faculty teams also have been working on the patient safety modules and incorporating aspects of patient safety into their individual work environments. Our team's goal is to develop a sustainable and manageable faculty development program that includes modules addressing quality improvement and patient safety in accordance with Accreditation Council for Graduate Medical Education accreditation requirements.

  9. Does user-centred design affect the efficiency, usability and safety of CPOE order sets?

    PubMed

    Chan, Julie; Shojania, Kaveh G; Easty, Anthony C; Etchells, Edward E

    2011-05-01

    Application of user-centred design principles to Computerized provider order entry (CPOE) systems may improve task efficiency, usability or safety, but there is limited evaluative research of its impact on CPOE systems. We evaluated the task efficiency, usability, and safety of three order set formats: our hospital's planned CPOE order sets (CPOE Test), computer order sets based on user-centred design principles (User Centred Design), and existing pre-printed paper order sets (Paper). 27 staff physicians, residents and medical students. Sunnybrook Health Sciences Centre, an academic hospital in Toronto, Canada. Methods Participants completed four simulated order set tasks with three order set formats (two CPOE Test tasks, one User Centred Design, and one Paper). Order of presentation of order set formats and tasks was randomized. Users received individual training for the CPOE Test format only. Completion time (efficiency), requests for assistance (usability), and errors in the submitted orders (safety). 27 study participants completed 108 order sets. Mean task times were: User Centred Design format 273 s, Paper format 293 s (p=0.73 compared to UCD format), and CPOE Test format 637 s (p<0.0001 compared to UCD format). Users requested assistance in 31% of the CPOE Test format tasks, whereas no assistance was needed for the other formats (p<0.01). There were no significant differences in number of errors between formats. The User Centred Design format was more efficient and usable than the CPOE Test format even though training was provided for the latter. We conclude that application of user-centred design principles can enhance task efficiency and usability, increasing the likelihood of successful implementation.

  10. Safety risk assessment for vertical concrete formwork activities in civil engineering construction.

    PubMed

    López-Arquillos, Antonio; Rubio-Romero, Juan Carlos; Gibb, Alistair G F; Gambatese, John A

    2014-01-01

    The construction sector has one of the worst occupational health and safety records in Europe. Of all construction tasks, formwork activities are associated with a high frequency of accidents and injuries. This paper presents an investigation of the activities and related safety risks present in vertical formwork for in-situ concrete construction in the civil engineering sector. Using the methodology of staticized groups, twelve activities and ten safety risks were identified and validated by experts. Every safety risk identified in this manner was quantified for each activity using binary methodology according to the frequency and severity scales developed in prior research. A panel of experts was selected according to the relevant literature on staticized groups. The results obtained show that the activities with the highest risk in vertical formwork tasks are: Plumbing and leveling of forms, cutting of material, handling materials with cranes, and climbing or descending ladders. The most dangerous health and safety risks detected were falls from height, cutting and overexertion. The research findings provide construction practitioners with further evidence of the hazardous activities associated with concrete formwork construction and a starting point for targeting worker health and safety programmes.

  11. Hanford Environmental Dose Reconstruction Project. Monthly report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  12. Task frequency influences stimulus-driven effects on task selection during voluntary task switching.

    PubMed

    Arrington, Catherine M; Reiman, Kaitlin M

    2015-08-01

    Task selection during voluntary task switching involves both top-down (goal-directed) and bottom-up (stimulus-driven) mechanisms. The factors that shift the balance between these two mechanisms are not well characterized. In the present research, we studied the role that task frequency plays in determining the extent of stimulus-driven task selection. In two experiments, we used the basic paradigm adapted from Arrington (Memory & Cognition, 38, 991-997, 2008), in which the effect of stimulus availability serves as a marker of stimulus-driven task selection. A number and letter appeared on each trial with varying stimulus onset asynchronies, and participants performed either a consonant/vowel or an even/odd judgment. In Experiment 1, participants were instructed as to the relative frequency with which each task was to be performed (i.e., 50/50, 60/40, or 75/25) and were further instructed to make their transitions between tasks unpredictable. In Experiment 2, participants were given no instructions about how to select tasks, resulting in naturally occurring variation in task frequency. With both instructed (Exp. 1) and naturally occurring (Exp. 2) relative task frequencies, the less frequently performed task showed a greater effect of stimulus availability on task selection, suggestive of a larger influence of stimulus-driven mechanisms during task performance for the less frequent task. When goal-directed mechanisms of task choice are engaged less frequently, the relative influence of the stimulus environment increases.

  13. Railroad safety program, volume 1

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Since 1981, the Federal Railroad Administration (FRA) has annually prepared a National Inspection Plan (NIP) whose purpose is to summarize regional efforts to improve railroad transportation safety. The research concluded on the following tasks including the problems, conclusions and recommendations associated with these tasks is summarized: (1) the preparation of the 1983 NIP, with recommended procedures for improving future NIPs; (2) the development of an outline for the 1984 NIP, including a methodology for the allocation of inspection resources and other specialized regional activities; (3) the management and development of the 1984 NIP; and (4) the development of an instruction manual to be used in the preparation of future NIPs.

  14. Automated track video inspection pilot project.

    DOT National Transportation Integrated Search

    2013-09-01

    This project had two main objectives. The first was to improve the safety of transit workers, specifically right-of-way safety for rail transit : workers through demonstration of advanced track inspection techniques that limit the inspectors expos...

  15. Improving construction site safety through leader-based verbal safety communication.

    PubMed

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    . Coaching construction site foremen to include safety in their daily verbal exchanges with workers has a significantly positive and lasting effect on the level of safety, which is a proximal estimate for work-related accidents. It is recommended that future studies include coaching and feedback at all organizational levels and for all involved parties in the construction process. Building client regulations could assign the task of coaching to the client appointed safety coordinators or a manager/supervisor, and studies should measure longitudinal effects of coaching by following foremen and their work gangs from site to site. Copyright © 2010 National Safety Council and Elsevier Ltd. Published by Elsevier Ltd. All rights reserved.

  16. Performance Tasks and the Pedagogy of Broadway

    ERIC Educational Resources Information Center

    Chun, Marc

    2012-01-01

    If educators want students to practice and prepare for challenges they might eventually face, there are a number of useful strategies to connect academic learning to the "real world." One is to ask students to complete what are variously called "performance tasks," "case studies," "simulations," or "project- or problem-based learning units."…

  17. Designing Spreadsheet-Based Tasks for Purposeful Algebra

    ERIC Educational Resources Information Center

    Ainley, Janet; Bills, Liz; Wilson, Kirsty

    2005-01-01

    We describe the design of a sequence of spreadsheet-based pedagogic tasks for the introduction of algebra in the early years of secondary schooling within the Purposeful Algebraic Activity project. This design combines two relatively novel features to bring a different perspective to research in the use of spreadsheets for the learning and…

  18. Nurses' perceptions of involvement in Thunder Project. American Association of Critical-Care Nurses Thunder Project task force.

    PubMed

    1995-03-01

    The American Association of Critical-Care Nurse's (AACN) Thunder Project was conceptualized and developed to provide critical-care nurses with a research protocol ready for institutional review and implementation. Project goals included providing a research package (protocol, educational, and data collection materials) and a topic of clinical significance to critical-care nurses. Site coordinators and research associates were identified at participating institutions to coordinate and implement all study activities. In this article, an evaluation study undertaken to recount perceptions of site coordinators and research associates in relation to project goals and research experience is described. Data demonstrated that study goals were achieved, and research experience was considered professionally enhancing. Written comments described barriers to project implementation at participating sites. Obtaining informed consent and physician approval and/or cooperation were identified as significant barriers to implementation at some sites.

  19. Task transfer: another pressure for evolution of the medical profession.

    PubMed

    Van Der Weyden, Martin B

    2006-07-03

    Since the 1960s, Australian society and the medical profession have undergone enormous change. Our society has moved from a relatively homogeneous and conservative community, supported by limited government services, to one that is multicultural, focused on the individual and consumerism, and supported by extensive government programs, with health care a top public and political priority. A defining feature of contemporary society is its mistrust of institutions, professionals, public servants and politicians. The medical profession has changed from a cohesive entity, valuing generalism and with limited specialisation, to one splintered by ultra-specialisation and competing professional agendas. The medical workforce shortage and efforts to maintain the safety and quality of health services are putting acute pressure on the profession. Task transfer or role substitution of medical services is mooted as a potential solution to this pressure. This has the potential to drastically transform the profession. How task transfer will evolve and change medicine depends on the vision and leadership of the profession and a flexible pragmatism that safeguards quality and safety and places patient priorities above those of the profession.

  20. Task analysis of autonomous on-road driving

    NASA Astrophysics Data System (ADS)

    Barbera, Anthony J.; Horst, John A.; Schlenoff, Craig I.; Aha, David W.

    2004-12-01

    The Real-time Control System (RCS) Methodology has evolved over a number of years as a technique to capture task knowledge and organize it into a framework conducive to implementation in computer control systems. The fundamental premise of this methodology is that the present state of the task activities sets the context that identifies the requirements for all of the support processing. In particular, the task context at any time determines what is to be sensed in the world, what world model states are to be evaluated, which situations are to be analyzed, what plans should be invoked, and which behavior generation knowledge is to be accessed. This methodology concentrates on the task behaviors explored through scenario examples to define a task decomposition tree that clearly represents the branching of tasks into layers of simpler and simpler subtask activities. There is a named branching condition/situation identified for every fork of this task tree. These become the input conditions of the if-then rules of the knowledge set that define how the task is to respond to input state changes. Detailed analysis of each branching condition/situation is used to identify antecedent world states and these, in turn, are further analyzed to identify all of the entities, objects, and attributes that have to be sensed to determine if any of these world states exist. This paper explores the use of this 4D/RCS methodology in some detail for the particular task of autonomous on-road driving, which work was funded under the Defense Advanced Research Project Agency (DARPA) Mobile Autonomous Robot Software (MARS) effort (Doug Gage, Program Manager).

  1. Projecting one’s own spatial bias onto others during a theory-of-mind task

    PubMed Central

    Bio, Branden J.; Webb, Taylor W.; Graziano, Michael S. A.

    2018-01-01

    Many people show a left-right bias in visual processing. We measured spatial bias in neurotypical participants using a variant of the line bisection task. In the same participants, we measured performance in a social cognition task. This theory-of-mind task measured whether each participant had a processing-speed bias toward the right of, or left of, a cartoon agent about which the participant was thinking. Crucially, the cartoon was rotated such that what was left and right with respect to the cartoon was up and down with respect to the participant. Thus, a person’s own left-right bias could not align directly onto left and right with respect to the cartoon head. Performance on the two tasks was significantly correlated. People who had a natural bias toward processing their own left side of space were quicker to process how the cartoon might think about objects to the left side of its face, and likewise for a rightward bias. One possible interpretation of these results is that the act of processing one’s own personal space shares some of the same underlying mechanisms as the social cognitive act of reconstructing someone else’s processing of their space. PMID:29339513

  2. State of Tennessee strategic highway safety plan

    DOT National Transportation Integrated Search

    2007-08-01

    The State of Tennessee's Strategic Highway Safety Plan was developed by the Tennessee Strategic Highway Safety Committee with the goal of reaching a 10% fatality rate reduction, based on CY 2002 data, by the end of CY 2008, with a projected saving of...

  3. Performance Evaluation and Analysis of Rural Drinking Water Safety Project——A Case Study in Jiangsu, China

    NASA Astrophysics Data System (ADS)

    Du, Xiaorong

    2017-04-01

    Water is the basic condition for human survival and development. As China is the most populous country, rural drinking water safety problems are most conspicuous. Therefore, the Chinese government keeps increasing investment and has built a large number of rural drinking water safety projects. Scientific evaluation of project performance is of great significance to promote the sustainable operation of the project and the sustainable development of rural economy. Previous studies mainly focus on the economic benefits of the project, while ignoring the fact that the rural drinking water safety project is quasi-public goods, which has economic, social and ecological benefits. This paper establishes a comprehensive evaluation model for rural drinking water safety performance, which adapts the rules of "5E" (economy, efficiency, effectiveness, equity and environment) as the value orientation, and selects a rural drinking water safety project as object in case study at K District, which is in the north of Jiangsu Province, China. The results shows: 1) the comprehensive performance of K project is in good condition; 2) The performance of every part shows that the scores of criteria "efficiency", "environment" and "effect" are higher than the mean performance, while the "economy" is slightly lower than the mean and the "equity" is the lowest. 3) The performance of indicator layer shows that: the planned completion rate of project, the reduction rate of project cost and the penetration rate of water-use population are significantly lower than other indicators. Based on the achievements of previous studies and the characteristics of rural drinking water safety project, this study integrates the evaluation dimensions of equity and environment, which can contribute to a more comprehensive and systematic assessment of project performance and provide empirical data for performance evaluation and management of rural drinking water safety project. Key Words: Rural drinking water

  4. Naturalistic distraction and driving safety in older drivers

    PubMed Central

    Aksan, Nazan; Dawson, Jeffrey D.; Emerson, Jamie L.; Yu, Lixi; Uc, Ergun Y.; Anderson, Steven W.; Rizzo, Matthew

    2013-01-01

    Objective This study aimed to quantify and compare performance of middle-aged and older drivers during a naturalistic distraction paradigm (visual search for roadside targets) and predict older driver performance given functioning in visual, motor, and cognitive domains. Background Distracted driving can imperil healthy adults and may disproportionally affect the safety of older drivers with visual, motor, and cognitive decline. Methods Two hundred and three drivers, 120 healthy older (61 men and 59 women, ages 65 years or greater) and 83 middle-aged drivers (38 men and 45 women, ages 40–64 years), participated in an on-road test in an instrumented vehicle. Outcome measures included performance in roadside target identification (traffic signs and restaurants) and concurrent driver safety. Differences in visual, motor, and cognitive functioning served as predictors. Results Older drivers identified fewer landmarks and drove slower but committed more safety errors than middle-aged drivers. Greater familiarity with local roads benefited performance of middle-aged but not older drivers. Visual cognition predicted both traffic sign identification and safety errors while executive function predicted traffic sign identification over and above vision. Conclusion Older adults are susceptible to driving safety errors while distracted by common secondary visual search tasks that are inherent to driving. The findings underscore that age-related cognitive decline affects older driver management of driving tasks at multiple levels, and can help inform the design of on-road tests and interventions for older drivers. PMID:23964422

  5. Naturalistic distraction and driving safety in older drivers.

    PubMed

    Aksan, Nazan; Dawson, Jeffrey D; Emerson, Jamie L; Yu, Lixi; Uc, Ergun Y; Anderson, Steven W; Rizzo, Matthew

    2013-08-01

    In this study, we aimed to quantify and compare performance of middle-aged and older drivers during a naturalistic distraction paradigm (visual search for roadside targets) and to predict older drivers performance given functioning in visual, motor, and cognitive domains. Distracted driving can imperil healthy adults and may disproportionally affect the safety of older drivers with visual, motor, and cognitive decline. A total of 203 drivers, 120 healthy older (61 men and 59 women, ages 65 years and older) and 83 middle-aged drivers (38 men and 45 women, ages 40 to 64 years), participated in an on-road test in an instrumented vehicle. Outcome measures included performance in roadside target identification (traffic signs and restaurants) and concurrent driver safety. Differences in visual, motor, and cognitive functioning served as predictors. Older drivers identified fewer landmarks and drove slower but committed more safety errors than did middle-aged drivers. Greater familiarity with local roads benefited performance of middle-aged but not older drivers.Visual cognition predicted both traffic sign identification and safety errors, and executive function predicted traffic sign identification over and above vision. Older adults are susceptible to driving safety errors while distracted by common secondary visual search tasks that are inherent to driving. The findings underscore that age-related cognitive decline affects older drivers' management of driving tasks at multiple levels and can help inform the design of on-road tests and interventions for older drivers.

  6. Lower Klickitat Riparian and In-channel Habitat Restoration Project; Klickitat Watershed Enhancement, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conley, Will

    2004-01-01

    The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream andmore » contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with

  7. Final Report on ITER Task Agreement 81-10

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brad J. Merrill

    An International Thermonuclear Experimental Reactor (ITER) Implementing Task Agreement (ITA) on Magnet Safety was established between the ITER International Organization (IO) and the Idaho National Laboratory (INL) Fusion Safety Program (FSP) during calendar year 2004. The objectives of this ITA were to add new capabilities to the MAGARC code and to use this updated version of MAGARC to analyze unmitigated superconductor quench events for both poloidal field (PF) and toroidal field (TF) coils of the ITER design. This report documents the completion of the work scope for this ITA. Based on the results obtained for this ITA, an unmitigated quenchmore » event in an ITER larger PF coil does not appear to be as severe an accident as in an ITER TF coil.« less

  8. Virtual reality simulation for construction safety promotion.

    PubMed

    Zhao, Dong; Lucas, Jason

    2015-01-01

    Safety is a critical issue for the construction industry. Literature argues that human error contributes to more than half of occupational incidents and could be directly impacted by effective training programs. This paper reviews the current safety training status in the US construction industry. Results from the review evidence the gap between the status and industry expectation on safety. To narrow this gap, this paper demonstrates the development and utilisation of a training program that is based on virtual reality (VR) simulation. The VR-based safety training program can offer a safe working environment where users can effectively rehearse tasks with electrical hazards and ultimately promote their abilities for electrical hazard cognition and intervention. Its visualisation and simulation can also remove the training barriers caused by electricity's features of invisibility and dangerousness.

  9. NASA's Software Safety Standard

    NASA Technical Reports Server (NTRS)

    Ramsay, Christopher M.

    2005-01-01

    NASA (National Aeronautics and Space Administration) relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft (manned or unmanned) launched that did not have a computer on board that provided vital command and control services. Despite this growing dependence on software control and monitoring, there has been no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Led by the NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard (STD-18l9.13B) has recently undergone a significant update in an attempt to provide that consistency. This paper will discuss the key features of the new NASA Software Safety Standard. It will start with a brief history of the use and development of software in safety critical applications at NASA. It will then give a brief overview of the NASA Software Working Group and the approach it took to revise the software engineering process across the Agency.

  10. Skills Conversion Project: Chapter 17, Occupational Safety and Health. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The greatest employment opportunity for safety professionals at the present time is with the Department of Labor for enforcement of the Williams-Steiger Act, which establishes the Occupational Safety and Health Administration (OSHA). As part of a federal study of job possibilities for displaced aerospace and defense technical professionals, it was…

  11. Do we always prioritize balance when walking? Towards an integrated model of task prioritization.

    PubMed

    Yogev-Seligmann, Galit; Hausdorff, Jeffrey M; Giladi, Nir

    2012-05-01

    Previous studies suggest that strategies such as "posture first" are implicitly employed to regulate safety when healthy adults walk while simultaneously performing another task, whereas "posture second" may be inappropriately applied in the presence of neurological disease. However, recent understandings raise questions about the traditional resource allocation concept during walking while dual tasking. We propose a task prioritization model of walking while dual tasking that integrates motor and cognitive capabilities, focusing on postural reserve, hazard estimation, and other individual intrinsic factors. The proposed prioritization model provides a theoretical foundation for future studies and a framework for the development of interventions designed to reduce the profound negative impacts of dual tasking on gait and fall risk in patients with neurological diseases. © 2012 Movement Disorder Society. Copyright © 2012 Movement Disorder Society.

  12. Safety and Mission Assurance (SMA) Automated Task Order Management System (ATOMS) Operation Manual

    NASA Technical Reports Server (NTRS)

    Wallace, Shawn; Fikes, Lou A.

    2016-01-01

    This document describes operational aspects of the ATOMS system. The information provided is limited to the functionality provided by ATOMS and does not include information provided in the contractor's proprietary financial and task management system.

  13. Building gold standard corpora for medical natural language processing tasks.

    PubMed

    Deleger, Louise; Li, Qi; Lingren, Todd; Kaiser, Megan; Molnar, Katalin; Stoutenborough, Laura; Kouril, Michal; Marsolo, Keith; Solti, Imre

    2012-01-01

    We present the construction of three annotated corpora to serve as gold standards for medical natural language processing (NLP) tasks. Clinical notes from the medical record, clinical trial announcements, and FDA drug labels are annotated. We report high inter-annotator agreements (overall F-measures between 0.8467 and 0.9176) for the annotation of Personal Health Information (PHI) elements for a de-identification task and of medications, diseases/disorders, and signs/symptoms for information extraction (IE) task. The annotated corpora of clinical trials and FDA labels will be publicly released and to facilitate translational NLP tasks that require cross-corpora interoperability (e.g. clinical trial eligibility screening) their annotation schemas are aligned with a large scale, NIH-funded clinical text annotation project.

  14. Integrating human and machine intelligence in galaxy morphology classification tasks

    NASA Astrophysics Data System (ADS)

    Beck, Melanie R.; Scarlata, Claudia; Fortson, Lucy F.; Lintott, Chris J.; Simmons, B. D.; Galloway, Melanie A.; Willett, Kyle W.; Dickinson, Hugh; Masters, Karen L.; Marshall, Philip J.; Wright, Darryl

    2018-06-01

    Quantifying galaxy morphology is a challenging yet scientifically rewarding task. As the scale of data continues to increase with upcoming surveys, traditional classification methods will struggle to handle the load. We present a solution through an integration of visual and automated classifications, preserving the best features of both human and machine. We demonstrate the effectiveness of such a system through a re-analysis of visual galaxy morphology classifications collected during the Galaxy Zoo 2 (GZ2) project. We reprocess the top-level question of the GZ2 decision tree with a Bayesian classification aggregation algorithm dubbed SWAP, originally developed for the Space Warps gravitational lens project. Through a simple binary classification scheme, we increase the classification rate nearly 5-fold classifying 226 124 galaxies in 92 d of GZ2 project time while reproducing labels derived from GZ2 classification data with 95.7 per cent accuracy. We next combine this with a Random Forest machine learning algorithm that learns on a suite of non-parametric morphology indicators widely used for automated morphologies. We develop a decision engine that delegates tasks between human and machine and demonstrate that the combined system provides at least a factor of 8 increase in the classification rate, classifying 210 803 galaxies in just 32 d of GZ2 project time with 93.1 per cent accuracy. As the Random Forest algorithm requires a minimal amount of computational cost, this result has important implications for galaxy morphology identification tasks in the era of Euclid and other large-scale surveys.

  15. Shape equivalence under perspective and projective transformations.

    PubMed

    Wagemans, J; Lamote, C; Van Gool, L

    1997-06-01

    When a planar shape is viewed obliquely, it is deformed by a perspective deformation. If the visual system were to pick up geometrical invariants from such projections, these would necessarily be invariant under the wider class of projective transformations. To what extent can the visual system tell the difference between perspective and nonperspective but still projective deformations of shapes? To investigate this, observers were asked to indicate which of two test patterns most resembled a standard pattern. The test patterns were related to the standard pattern by a perspective or projective transformation, or they were completely unrelated. Performance was slightly better in a matching task with perspective and unrelated test patterns (92.6%) than in a projective-random matching task (88.8%). In a direct comparison, participants had a small preference (58.5%) for the perspectively related patterns over the projectively related ones. Preferences were based on the values of the transformation parameters (slant and shear). Hence, perspective and projective transformations yielded perceptual differences, but they were not treated in a categorically different manner by the human visual system.

  16. Human factors evaluation of remote afterloading brachytherapy: Human error and critical tasks in remote afterloading brachytherapy and approaches for improved system performance. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Callan, J.R.; Kelly, R.T.; Quinn, M.L.

    1995-05-01

    Remote Afterloading Brachytherapy (RAB) is a medical process used in the treatment of cancer. RAB uses a computer-controlled device to remotely insert and remove radioactive sources close to a target (or tumor) in the body. Some RAB problems affecting the radiation dose to the patient have been reported and attributed to human error. To determine the root cause of human error in the RAB system, a human factors team visited 23 RAB treatment sites in the US The team observed RAB treatment planning and delivery, interviewed RAB personnel, and performed walk-throughs, during which staff demonstrated the procedures and practices usedmore » in performing RAB tasks. Factors leading to human error in the RAB system were identified. The impact of those factors on the performance of RAB was then evaluated and prioritized in terms of safety significance. Finally, the project identified and evaluated alternative approaches for resolving the safety significant problems related to human error.« less

  17. Principles of Safety Pharmacology

    PubMed Central

    Pugsley, M K; Authier, S; Curtis, M J

    2008-01-01

    Safety Pharmacology is a rapidly developing discipline that uses the basic principles of pharmacology in a regulatory-driven process to generate data to inform risk/benefit assessment. The aim of Safety Pharmacology is to characterize the pharmacodynamic/pharmacokinetic (PK/PD) relationship of a drug's adverse effects using continuously evolving methodology. Unlike toxicology, Safety Pharmacology includes within its remit a regulatory requirement to predict the risk of rare lethal events. This gives Safety Pharmacology its unique character. The key issues for Safety Pharmacology are detection of an adverse effect liability, projection of the data into safety margin calculation and finally clinical safety monitoring. This article sets out to explain the drivers for Safety Pharmacology so that the wider pharmacology community is better placed to understand the discipline. It concludes with a summary of principles that may help inform future resolution of unmet needs (especially establishing model validation for accurate risk assessment). Subsequent articles in this issue of the journal address specific aspects of Safety Pharmacology to explore the issues of model choice, the burden of proof and to highlight areas of intensive activity (such as testing for drug-induced rare event liability, and the challenge of testing the safety of so-called biologics (antibodies, gene therapy and so on.). PMID:18604233

  18. Safety performance functions for freeway merge zones.

    DOT National Transportation Integrated Search

    2013-12-01

    This report documents the results of a research project to support CDOT in the area of Safety : Performance Function (SPF) development. The project involved collecting data and developing SPFs for : ramp-freeway merge zones categorized as isolated, n...

  19. MSFC's Advanced Space Propulsion Formulation Task

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Gerrish, Harold P.; Robinson, Joel W.; Taylor, Terry L.

    2012-01-01

    In NASA s Fiscal Year 2012, a small project was undertaken to provide additional substance, depth, and activity knowledge to the technology areas identified in the In-Space Propulsion Systems Roadmap, Technology Area 02 (TA-02), as created under the auspices of the NASA Office of the Chief Technologist (OCT). This roadmap was divided into four basic groups: (1) Chemical Propulsion, (2) Non-chemical Propulsion, (3) Advanced (TRL<3) Propulsion Technologies, and (4) Supporting Technologies. The first two were grouped according to the governing physics. The third group captured technologies and physic concepts that are at a lower TRL level. The fourth group identified pertinent technical areas that are strongly coupled with these related areas which could allow significant improvements in performance. There were a total of 45 technologies identified in TA-02, and 25 of these were studied in this formulation task. The goal of this task was to provide OCT with a knowledge-base for decisionmaking on advanced space propulsion technologies and not waste money by unintentionally repeating past projects or funding the technologies with minor impacts. This formulation task developed the next level of detail for technologies described and provides context to OCT where investments should be made. The presentation will begin with the list of technologies from TA-02, how they were prioritized for this study, and details on what additional data was captured for the technologies studied. Following this, some samples of the documentation will be provided, followed by plans on how the data will be made accessible.

  20. Generalizability of New Standards Project, 1993 Pilot Study Tasks in Mathematics. Technical Issues in Procedures To Link State Results to a Common National Standard. Project 2.4 Quantitative Models To Monitor the Status and Progress of Learning and Performance and Their Antecedents.

    ERIC Educational Resources Information Center

    Linn, Robert L.

    The New Standards Project conducted a pilot test of a series of performance-based assessment tasks in mathematics and English language arts at Grades 4 and 8 in the spring of 1993. This paper reports the results of a series of generalizability analyses conducted for a subset of the 1993 pilot study data in mathematics. Generalizability analyses…