Sample records for safety test pressure

  1. 49 CFR 195.304 - Test pressure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Test pressure. 195.304 Section 195.304... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.304 Test pressure. The test pressure for each pressure test conducted under...

  2. 49 CFR 195.304 - Test pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Test pressure. 195.304 Section 195.304... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.304 Test pressure. The test pressure for each pressure test conducted under...

  3. 49 CFR 195.304 - Test pressure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Test pressure. 195.304 Section 195.304... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.304 Test pressure. The test pressure for each pressure test conducted under...

  4. 49 CFR 195.304 - Test pressure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Test pressure. 195.304 Section 195.304... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.304 Test pressure. The test pressure for each pressure test conducted under...

  5. Pressure Safety Program Implementation at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lower, Mark; Etheridge, Tom; Oland, C. Barry

    2013-01-01

    The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According tomore » 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and

  6. 33 CFR 183.586 - Pressure impulse test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.586 Pressure impulse test. A fuel... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Pressure impulse test. 183.586... pressure test under § 183.580. (b) If the tank is non-metallic, fill it to capacity with a gasoline that...

  7. 33 CFR 183.586 - Pressure impulse test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.586 Pressure impulse test. A fuel... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Pressure impulse test. 183.586... pressure test under § 183.580. (b) If the tank is non-metallic, fill it to capacity with a gasoline that...

  8. 33 CFR 183.586 - Pressure impulse test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.586 Pressure impulse test. A fuel... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Pressure impulse test. 183.586... pressure test under § 183.580. (b) If the tank is non-metallic, fill it to capacity with a gasoline that...

  9. 33 CFR 183.586 - Pressure impulse test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.586 Pressure impulse test. A fuel... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Pressure impulse test. 183.586... pressure test under § 183.580. (b) If the tank is non-metallic, fill it to capacity with a gasoline that...

  10. 33 CFR 183.586 - Pressure impulse test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.586 Pressure impulse test. A fuel... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Pressure impulse test. 183.586... pressure test under § 183.580. (b) If the tank is non-metallic, fill it to capacity with a gasoline that...

  11. 49 CFR 179.220-24 - Tests of pressure relief valves.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-24 Tests of pressure relief valves. Each safety relief valve must be tested by air or gas for compliance with § 179.15...

  12. 49 CFR 179.220-24 - Tests of pressure relief valves.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.220-24 Tests of pressure relief valves. Each safety relief valve must be tested by air or gas for compliance with § 179.15...

  13. Systematic impact of institutional pressures on safety climate in the construction industry.

    PubMed

    He, Qinghua; Dong, Shuang; Rose, Timothy; Li, Heng; Yin, Qin; Cao, Dongping

    2016-08-01

    This paper explores how three types of institutional pressure (i.e., coercive, mimetic and normative pressures) systematically impact on the safety climate of construction projects. These impacts are empirically tested by survey data collected from 186 questionnaires of construction companies operating in Shanghai, China. The results, obtained by partial least squares analysis, show that organizational management commitment to safety and employee involvement is positively related to all three institutional pressures, while the perception of responsibility for safety and health is significantly influenced by coercive and mimetic pressure. However, coercive and normative pressures have no significant effect on the applicability of safety rules and work practices, revealing the importance of external organizational pressures in improving project safety climate from a systematic view. The findings also provide insights into the use of institutional forces to facilitate the improvement of safety climate in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. Guidelines for pressure vessel safety assessment

    NASA Astrophysics Data System (ADS)

    Yukawa, S.

    1990-04-01

    A technical overview and information on metallic pressure containment vessels and tanks is given. The intent is to provide Occupational Safety and Health Administration (OSHA) personnel and other persons with information to assist in the evaluation of the safety of operating pressure vessels and low pressure storage tanks. The scope is limited to general industrial application vessels and tanks constructed of carbon or low alloy steels and used at temperatures between -75 and 315 C (-100 and 600 F). Information on design codes, materials, fabrication processes, inspection and testing applicable to the vessels and tanks are presented. The majority of the vessels and tanks are made to the rules and requirements of ASME Code Section VIII or API Standard 620. The causes of deterioration and damage in operation are described and methods and capabilities of detecting serious damage and cracking are discussed. Guidelines and recommendations formulated by various groups to inspect for the damages being found and to mitigate the causes and effects of the problems are presented.

  15. 30 CFR 7.307 - Static pressure test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Static pressure test. 7.307 Section 7.307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS TESTING BY APPLICANT OR THIRD PARTY Electric Motor Assemblies § 7.307 Static...

  16. 30 CFR 18.67 - Static-pressure tests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Static-pressure tests. 18.67 Section 18.67 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Inspections and Tests § 18...

  17. 33 CFR 183.580 - Static pressure test for fuel tanks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...

  18. 33 CFR 183.580 - Static pressure test for fuel tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...

  19. 33 CFR 183.580 - Static pressure test for fuel tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...

  20. 33 CFR 183.580 - Static pressure test for fuel tanks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...

  1. 33 CFR 183.580 - Static pressure test for fuel tanks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Static pressure test for fuel... SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.580 Static pressure test for fuel tanks. A fuel tank is tested by performing the following procedures in the following...

  2. Pressure vessel burst test program - Initial program paper

    NASA Technical Reports Server (NTRS)

    Cain, Maurice R.; Sharp, Douglas E.; Coleman, Michael D.; Webb, Bobby L.

    1990-01-01

    The current status of a pressure vessel burst test program, aimed at the study of the blast waves and fragmentation characteristics of ruptured gas-filled pressure vessels, is reported. The program includes a series of test plans, each involving multiple bursts with burst pressures ranging to 7500 psig. The discussion covers the identification of concerns and hazards, application of the data generated, and a brief review of the current methods for assessing vessel safety and burst parameters. Attention is also given to pretest activities, including completed vessel and facility/instrumentation preparation and results of completed preliminary burst tests.

  3. Time pressure in scenario-based online construction safety quizzes and its effect on students' performance

    NASA Astrophysics Data System (ADS)

    Jaeger, Martin; Adair, Desmond

    2017-05-01

    Online quizzes have been shown to be effective learning and assessment approaches. However, if scenario-based online construction safety quizzes do not include time pressure similar to real-world situations, they reflect situations too ideally. The purpose of this paper is to compare engineering students' performance when carrying out an online construction safety quiz with time pressure versus an online construction safety quiz without time pressure. Two versions of an online construction safety quiz are developed and administered to randomly assigned engineering students based on a quasi-experimental post-test design. The findings contribute to scenario-based learning and assessment of construction safety in four ways. First, the results confirm earlier findings that 'intrinsic stress' does not seem to impair students' performance. Second, students who carry out the online construction safety quiz with time pressure are less likely to 'learn by trial and error'. Third, students exposed to time pressure appreciate that they become better prepared for real life. Finally, preparing students to work under time pressure is an important industry requirement. The results of this study should encourage engineering educators to explore and implement ways to include time pressure in scenario-based online quizzes and learning.

  4. Composite Overwrapped Pressure Vessel (COPV) Stress Rupture Testing

    NASA Technical Reports Server (NTRS)

    Greene, Nathanael J.; Saulsberry, Regor L.; Leifeste, Mark R.; Yoder, Tommy B.; Keddy, Chris P.; Forth, Scott C.; Russell, Rick W.

    2010-01-01

    This paper reports stress rupture testing of Kevlar(TradeMark) composite overwrapped pressure vessels (COPVs) at NASA White Sands Test Facility. This 6-year test program was part of the larger effort to predict and extend the lifetime of flight vessels. Tests were performed to characterize control parameters for stress rupture testing, and vessel life was predicted by statistical modeling. One highly instrumented 102-cm (40-in.) diameter Kevlar(TradeMark) COPV was tested to failure (burst) as a single-point model verification. Significant data were generated that will enhance development of improved NDE methods and predictive modeling techniques, and thus better address stress rupture and other composite durability concerns that affect pressure vessel safety, reliability and mission assurance.

  5. Edwards nXDS15iC Vacuum Scroll Pump Pressure Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sessions, H.; Morgan, G. A.

    2013-07-17

    The SRNL High Pressure Laboratory performed testing on an Edwards Model nXDS15iC Vacuum Scroll Pump on July 10th and 11th of 2013 at 723-A. This testing was done in an attempt to obtain initial compression ratio information for the nXDS15iC pump, with compression ratio defined as discharge pressure of the pump divided by suction pressure. Pressure burst testing was also done on the pump to determine its design pressure for pressure safety reasons. The Edwards nXDS15iC pump is being evaluated by SRNL for use part of the SHINE project being executed by SRNL.

  6. 49 CFR 179.100-19 - Tests of safety relief valves.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Tests of safety relief valves. 179.100-19 Section... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120...

  7. 49 CFR 179.100-19 - Tests of safety relief valves.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Tests of safety relief valves. 179.100-19 Section... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-19...

  8. 49 CFR 179.100-19 - Tests of safety relief valves.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Tests of safety relief valves. 179.100-19 Section... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-19...

  9. 49 CFR 179.100-19 - Tests of safety relief valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Tests of safety relief valves. 179.100-19 Section... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120) § 179.100-19...

  10. 49 CFR 179.200-23 - Tests of pressure relief valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-23 Tests of...

  11. 49 CFR 179.200-23 - Tests of pressure relief valves.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-23 Tests of...

  12. 49 CFR 179.200-23 - Tests of pressure relief valves.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200-23 Tests of...

  13. Safety shield for vacuum/pressure-chamber windows

    NASA Technical Reports Server (NTRS)

    Shimansky, R. A.; Spencer, R.

    1980-01-01

    Optically-clear shatter-resistant safety shield protects workers from implosion and explosion of vacuum and pressure windows. Plastic shield is inexpensive and may be added to vacuum chambers, pressure chambers, and gas-filling systems.

  14. A Novel Lithium-ion Laminated Pouch Cell Tested For Performance And Safety

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith A.; Inoue, Takefumi

    2006-01-01

    A new Li-ion 4.0 Ah pouch cell from GS Yuasa has been tested to determine its performance and safety. The cell is of a laminate pouch design with liquid electrolyte. The rate, thermal and vacuum performance capabilities have been tested to determine the optimum parameters. Under vacuum conditions, the cells were cycled under restrained and unrestrained configurations. The burst pressure of the laminate pouch was also determined. The overcharge, overdischarge into reversal and external short circuit safety tests were also performed to determine the cell s tolerance to abuse. Key Words: Li-ion, safety, vacuum test, abuse, COTS batteries, rate capability

  15. Work Pressure and Safety Behaviors among Health Workers in Ghana: The Moderating Role of Management Commitment to Safety.

    PubMed

    Amponsah-Tawaih, Kwesi; Adu, Michael Appiah

    2016-12-01

    safety and healthy working environment has received numerous research attention over the years. Majority of these researches seem to have been conducted in the construction industry, with little attention in the health sector. Nonetheless, there are couple of studies conducted in Africa that suggest pressure in hospitals. Therefore the aim of the study was to examine how pressure influence safety behavior in the hospitals. With reference to the relevance of safety behavior in primary health care delivery, there was the need for the study. Data was obtained from 422 public hospital employees. Respondents were assured that all information would be kept confidential to increase the response rate and acquire more accurate information. Collection of questionnaires from participants took four weeks (20 working days), after which the data was analyzed. The result of the study showed that work pressure correlated negatively with safety behavior. General safety climate significantly correlated positively with safety behavior and negatively with work pressure, although the effect size for the latter was smaller. Hierarchical regression analysis showed management commitment to safety to moderate the relationship between work pressure and safety behavior. When employees perceive safety communication, safety systems and training to be positive, they seem to comply with safety rules and procedures than voluntarily participate in safety activities.

  16. Safety Evaluation Report: Development of Improved Composite Pressure Vessels for Hydrogen Storage, Lincoln Composites, Lincoln, NE, May 25, 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fort, III, William C.; Kallman, Richard A.; Maes, Miguel

    2010-12-22

    Lincoln Composites operates a facility for designing, testing, and manufacturing composite pressure vessels. Lincoln Composites also has a U.S. Department of Energy (DOE)-funded project to develop composite tanks for high-pressure hydrogen storage. The initial stage of this project involves testing the permeation of high-pressure hydrogen through polymer liners. The company recently moved and is constructing a dedicated research/testing laboratory at their new location. In the meantime, permeation tests are being performed in a corner of a large manufacturing facility. The safety review team visited the Lincoln Composites site on May 25, 2010. The project team presented an overview of themore » company and project and took the safety review team on a tour of the facility. The safety review team saw the entire process of winding a carbon fiber/resin tank on a liner, installing the boss and valves, and curing and painting the tank. The review team also saw the new laboratory that is being built for the DOE project and the temporary arrangement for the hydrogen permeation tests.« less

  17. Transient Pressure Test Article Test Program

    NASA Technical Reports Server (NTRS)

    Vibbart, Charles M.

    1989-01-01

    The Transient Pressure Test Article (TPTA) test program is being conducted at a new test facility located in the East Test Area at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) in Huntsville, Alabama. This facility, along with the special test equipment (STE) required for facility support, was constructed specifically to test and verify the sealing capability of the Redesigned Solid Rocket Motor (RSRM) field, igniter, and nozzle joints. The test article consists of full scale RSRM hardware loaded with inert propellant and assembled in a short stack configuration. The TPTA is pressurized by igniting a propellant cartridge capable of inducing a pressure rise rate which stimulates the ignition transient that occurs during launch. Dynamic loads are applied during the pressure cycle to simulate external tank attach (ETA) strut loads present on the ETA ring. Sealing ability of the redesigned joints is evaluated under joint movement conditions produced by these combined loads since joint sealing ability depends on seal resilience velocity being greater than gap opening velocity. Also, maximum flight dynamic loads are applied to the test article which is either pressurized to 600 psia using gaseous nitrogen (GN2) or applied to the test article as the pressure decays inside the test article on the down cycle after the ignition transient cycle. This new test facility is examined with respect to its capabilities. In addition, both the topic of test effectiveness versus space vehicle flight performance and new aerospace test techniques, as well as a comparison between the old SRM design and the RSRM are presented.

  18. A Risk Analysis Methodology to Address Human and Organizational Factors in Offshore Drilling Safety: With an Emphasis on Negative Pressure Test

    NASA Astrophysics Data System (ADS)

    Tabibzadeh, Maryam

    According to the final Presidential National Commission report on the BP Deepwater Horizon (DWH) blowout, there is need to "integrate more sophisticated risk assessment and risk management practices" in the oil industry. Reviewing the literature of the offshore drilling industry indicates that most of the developed risk analysis methodologies do not fully and more importantly, systematically address the contribution of Human and Organizational Factors (HOFs) in accident causation. This is while results of a comprehensive study, from 1988 to 2005, of more than 600 well-documented major failures in offshore structures show that approximately 80% of those failures were due to HOFs. In addition, lack of safety culture, as an issue related to HOFs, have been identified as a common contributing cause of many accidents in this industry. This dissertation introduces an integrated risk analysis methodology to systematically assess the critical role of human and organizational factors in offshore drilling safety. The proposed methodology in this research focuses on a specific procedure called Negative Pressure Test (NPT), as the primary method to ascertain well integrity during offshore drilling, and analyzes the contributing causes of misinterpreting such a critical test. In addition, the case study of the BP Deepwater Horizon accident and their conducted NPT is discussed. The risk analysis methodology in this dissertation consists of three different approaches and their integration constitutes the big picture of my whole methodology. The first approach is the comparative analysis of a "standard" NPT, which is proposed by the author, with the test conducted by the DWH crew. This analysis contributes to identifying the involved discrepancies between the two test procedures. The second approach is a conceptual risk assessment framework to analyze the causal factors of the identified mismatches in the previous step, as the main contributors of negative pressure test

  19. Evaluation of the concept of pressure proof testing fuselage structures

    NASA Technical Reports Server (NTRS)

    Harris, Charles E.; Orringer, Oscar

    1991-01-01

    The FAA and NASA have recently completed independent technical evaluations of the concept of pressure proof testing the fuselage of commercial transport airplanes. The results of these evaluations are summarized. The objectives of the evaluations were to establish the potential benefit of the pressure proof test, to quantify the most desirable proof test pressure, and to quantify the required proof test interval. The focus of the evaluations was on multiple-site cracks extending from adjacent rivet holes of a typical fuselage longitudinal lap splice joint. The FAA and NASA do not support pressure proof testing the fuselage of aging commercial transport aircraft. The argument against proof testing is as follows: (1) a single proof test does not insure an indefinite life; therefore, the proof test must be repeated at regular intervals; (2) for a proof factor of 1.33, the required proof test interval must be below 300 flights to account for uncertainties in the evaluation; (3) conducting the proof test at a proof factor of 1.5 would considerably exceed the fuselage design limit load; therefore, it is not consistent with accepted safe practices; and (4) better safety can be assured by implementing enhanced nondestructive inspection requirements, and adequate reliability can be achieved by an inspection interval several times longer than the proof test interval.

  20. Fire safety arrangement of inhabited pressurized compartments of manned spacecraft

    NASA Astrophysics Data System (ADS)

    Bolodian, Ivan; Melikhov, Anatoliy; Tanklevskiy, Leonid

    2017-06-01

    The article deals with innovative technical solutions that provide fire safety in inhabited pressurized compartments of manned spacecraft by means of a fireproof device of inhabited pressurized compartments via application of engineering means of fire prevention and fire spreading prevention by lowering fire load in an inhabited pressurized module up to the point when the maximum possible levels of fire factors in an inhabited pressurized compartment of a manned spacecraft are prevented. Represented technical solutions are used at the present time according to stated recommendations during provision of fire safety of equipment created by a number of Russian organizations for equipage of inhabited pressurized compartments of spacecraft of the Russian segment of International space station.

  1. 49 CFR 179.103-4 - Safety relief devices and pressure regulators.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Safety relief devices and pressure regulators. 179...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120...

  2. 49 CFR 179.103-4 - Safety relief devices and pressure regulators.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Safety relief devices and pressure regulators. 179...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120...

  3. 49 CFR 179.103-4 - Safety relief devices and pressure regulators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Safety relief devices and pressure regulators. 179... HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120...

  4. 49 CFR 179.103-4 - Safety relief devices and pressure regulators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Safety relief devices and pressure regulators. 179...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SPECIFICATIONS FOR TANK CARS Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120...

  5. Testing of Confining Pressure Impacton Explosion Energy of Explosive Materials

    NASA Astrophysics Data System (ADS)

    Drzewiecki, Jan; Myszkowski, Jacek; Pytlik, Andrzej; Pytlik, Mateusz

    2017-06-01

    This paper presents the results of testing the explosion effects of two explosive charges placed in an environment with specified values of confining pressure. The aim of this study is to determine the impact of variable environmental conditions on the suitability of particular explosives for their use in the prevention of natural hazards in hard coal mining. The research results will contribute to improving the efficiency of currently adopted technologies of natural hazard prevention and aid in raising the level of occupational safety. To carry out the subject matter measurements, a special test stand was constructed which allows the value of the initial pressure inside the chamber, which constitutes its integral part, to be altered before the detonation of the charge being tested. The obtained characteristics of the pressure changes during the explosion of the analysed charge helped to identify the work (energy) which was produced during the process. The test results are a valuable source of information, opening up new possibilities for the use of explosives, the development of innovative solutions for the construction of explosive charges and their initiation.

  6. Pressure-Application Device for Testing Pressure Sensors

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A portable pressure-application device has been designed and built for use in testing and calibrating piezoelectric pressure transducers in the field. The device generates pressure pulses of known amplitude. A pressure pulse (in contradistinction to a steady pressure) is needed because in the presence of a steady pressure, the electrical output of a piezoelectric pressure transducer decays rapidly with time. The device includes a stainless- steel compressed-air-storage cylinder of 500 cu cm volume. A manual hand pump with check valves and a pressure gauge are located at one end of the cylinder. A three-way solenoid valve that controls the release of pressurized air is located at the other end of the cylinder. Power for the device is provided by a 3.7-V cordless-telephone battery. The valve is controlled by means of a pushbutton switch, which activates a 5 V to +/-15 V DC-to-DC converter that powers the solenoid. The outlet of the solenoid valve is connected to the pressure transducer to be tested. Before the solenoid is energized, the transducer to be tested is at atmospheric pressure. When the solenoid is actuated by the push button, pressurized air from inside the cylinder is applied to the transducer. Once the pushbutton is released, the cylinder pressure is removed from the transducer and the pressurized air applied to the transducer is vented, bringing the transducer back to atmospheric pressure. Before this device was used for actual calibration, its accuracy was checked with a NIST (National Institute of Standards and Technology) traceable calibrator and commercially calibrated pressure transducers. This work was done by Wanda Solano of Stennis Space Center and Greg Richardson of Lockheed Martin Corp.

  7. 49 CFR 195.304 - Test pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Test pressure. 195.304 Section 195.304... PIPELINE Pressure Testing § 195.304 Test pressure. The test pressure for each pressure test conducted under... case of a pipeline that is not visually inspected for leakage during the test, for at least an...

  8. Safety validation test equipment operation

    NASA Astrophysics Data System (ADS)

    Kurosaki, Tadaaki; Watanabe, Takashi

    1992-08-01

    An overview of the activities conducted on safety validation test equipment operation for materials used for NASA manned missions is presented. Safety validation tests, such as flammability, odor, offgassing, and so forth were conducted in accordance with NASA-NHB-8060.1C using test subjects common with those used by NASA, and the equipment used were qualified for their functions and performances in accordance with NASDA-CR-99124 'Safety Validation Test Qualification Procedures.' Test procedure systems were established by preparing 'Common Procedures for Safety Validation Test' as well as test procedures for flammability, offgassing, and odor tests. The test operation organization chaired by the General Manager of the Parts and Material Laboratory of NASDA (National Space Development Agency of Japan) was established, and the test leaders and operators in the organization were qualified in accordance with the specified procedures. One-hundred-one tests had been conducted so far by the Parts and Material Laboratory according to the request submitted by the manufacturers through the Space Station Group and the Safety and Product Assurance for Manned Systems Office.

  9. Testing of heat exchangers in membrane oxygenators using air pressure.

    PubMed

    Hamilton, Carole; Stein, Jutta; Seidler, Rainer; Kind, Robert; Beck, Karin; Tosok, Jürgen; Upterfofel, Jörg

    2006-03-01

    All heat exchangers (HE) in membrane oxygenators are tested by the manufacturer for water leaks during the production phase. However, for safety reasons, it is highly recommended that HEs be tested again before clinical use. The most common method is to attach the heater-cooler to the HE and allow the water to recirculate for at least 10 min, during which time a water leak should be evident. To improve the detection of water leaks, a test was devised using a pressure manometer with an integrated bulb used to pressurize the HE with air. The cardiopulmonary bypass system is set up as per protocol. A pressure manometer adapted to a 1/2" tubing is connected to the water inlet side of the oxygenator. The water outlet side is blocked with a short piece of 1/2" deadend tubing. The HE is pressurized with 250 mmHg for at least 30 sec and observed for any drop. Over the last 2 years, only one oxygenator has been detected with a water leak in which the air-method leaktest was performed. This unit was sent back to the manufacturer who confirmed the failure. Even though the incidence of water leaks is very low, it does occur and it is, therefore, important that all HEs are tested before they are used clinically. This method of using a pressure manometer offers many advantages, as the HE can be tested outside of the operating room (OR), allowing earlier testing of the oxygenator, no water contact is necessary, and it is simple, easy and quick to perform.

  10. Large-Scale Spacecraft Fire Safety Tests

    NASA Technical Reports Server (NTRS)

    Urban, David; Ruff, Gary A.; Ferkul, Paul V.; Olson, Sandra; Fernandez-Pello, A. Carlos; T'ien, James S.; Torero, Jose L.; Cowlard, Adam J.; Rouvreau, Sebastien; Minster, Olivier; hide

    2014-01-01

    An international collaborative program is underway to address open issues in spacecraft fire safety. Because of limited access to long-term low-gravity conditions and the small volume generally allotted for these experiments, there have been relatively few experiments that directly study spacecraft fire safety under low-gravity conditions. Furthermore, none of these experiments have studied sample sizes and environment conditions typical of those expected in a spacecraft fire. The major constraint has been the size of the sample, with prior experiments limited to samples of the order of 10 cm in length and width or smaller. This lack of experimental data forces spacecraft designers to base their designs and safety precautions on 1-g understanding of flame spread, fire detection, and suppression. However, low-gravity combustion research has demonstrated substantial differences in flame behavior in low-gravity. This, combined with the differences caused by the confined spacecraft environment, necessitates practical scale spacecraft fire safety research to mitigate risks for future space missions. To address this issue, a large-scale spacecraft fire experiment is under development by NASA and an international team of investigators. This poster presents the objectives, status, and concept of this collaborative international project (Saffire). The project plan is to conduct fire safety experiments on three sequential flights of an unmanned ISS re-supply spacecraft (the Orbital Cygnus vehicle) after they have completed their delivery of cargo to the ISS and have begun their return journeys to earth. On two flights (Saffire-1 and Saffire-3), the experiment will consist of a flame spread test involving a meter-scale sample ignited in the pressurized volume of the spacecraft and allowed to burn to completion while measurements are made. On one of the flights (Saffire-2), 9 smaller (5 x 30 cm) samples will be tested to evaluate NASAs material flammability screening tests

  11. 14 CFR 23.843 - Pressurization tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Pressurization tests. 23.843 Section 23.843... Pressurization § 23.843 Pressurization tests. (a) Strength test. The complete pressurized cabin, including doors... in § 23.365(d). (b) Functional tests. The following functional tests must be performed: (1) Tests of...

  12. 14 CFR 23.843 - Pressurization tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Pressurization tests. 23.843 Section 23.843... Pressurization § 23.843 Pressurization tests. (a) Strength test. The complete pressurized cabin, including doors... in § 23.365(d). (b) Functional tests. The following functional tests must be performed: (1) Tests of...

  13. 14 CFR 23.843 - Pressurization tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Pressurization tests. 23.843 Section 23.843... Pressurization § 23.843 Pressurization tests. (a) Strength test. The complete pressurized cabin, including doors... in § 23.365(d). (b) Functional tests. The following functional tests must be performed: (1) Tests of...

  14. Water Drinking Test: Intraocular Pressure Changes after Tube Surgery and Trabeculectomy

    PubMed Central

    Razeghinejad, Mohammad Reza; Tajbakhsh, Zahra; Nowroozzadeh, Mohammad Hossein; Masoumpour, Masoumeh

    2017-01-01

    Purpose: To study the effects of filtration surgeries (tube and trabeculectomy) on changes in intraocular pressure after a water-drinking test. Methods: In this prospective, non-randomized, comparative clinical study, 30 patients who had tube surgery and 30 age- and sex-matched trabeculectomy patients underwent a water-drinking test. Only one eye of each patient was included. The baseline intraocular pressure was ≤21 mmHg in all enrolled eyes with or without adjunctive topical medications. After the water-drinking test, the intraocular pressure was measured and recorded at 15, 30, 45, and 60 minutes and the results were compared between the two groups. Results: In both groups, intraocular pressure significantly increased from baseline at all measured time-points (P < 0.001). In the trabeculectomy group, the average intraocular pressure increased from 14.8 ± 2.9 to 18.8 ± 4.7 mmHg at 30 minutes, but decreased at 60 min (18.0 ± 5.2 mmHg). In the Tube group, intraocular pressure increased incrementally until the last measurement (14.2 ± 3.9, 18.8 ± 5.6, and 19.7 ± 6.0 mmHg at baseline, 30, and 60 minutes, respectively). The end-pressure difference (intraocular pressure at 60 minutes vs. baseline) was significantly greater in the tube group (5.6 ± 3.6 mmHg; 41% change) than in the trabeculectomy group (3.2 ± 4.7; 23% change; P = 0.03). Conclusion: Intraocular pressure significantly increased after the water-drinking test in both the groups. Intraocular pressure started to decline 30 minutes after the water-drinking test in the trabeculectomy group, while it continued to increase up to 60 minutes in the Tube group. This finding may have implications regarding the efficacy or safety of the procedures in advanced glaucoma patients. PMID:29090048

  15. Water Drinking Test: Intraocular Pressure Changes after Tube Surgery and Trabeculectomy.

    PubMed

    Razeghinejad, Mohammad Reza; Tajbakhsh, Zahra; Nowroozzadeh, Mohammad Hossein; Masoumpour, Masoumeh

    2017-01-01

    To study the effects of filtration surgeries (tube and trabeculectomy) on changes in intraocular pressure after a water-drinking test. In this prospective, non-randomized, comparative clinical study, 30 patients who had tube surgery and 30 age- and sex-matched trabeculectomy patients underwent a water-drinking test. Only one eye of each patient was included. The baseline intraocular pressure was ≤21 mmHg in all enrolled eyes with or without adjunctive topical medications. After the water-drinking test, the intraocular pressure was measured and recorded at 15, 30, 45, and 60 minutes and the results were compared between the two groups. In both groups, intraocular pressure significantly increased from baseline at all measured time-points ( P < 0.001). In the trabeculectomy group, the average intraocular pressure increased from 14.8 ± 2.9 to 18.8 ± 4.7 mmHg at 30 minutes, but decreased at 60 min (18.0 ± 5.2 mmHg). In the Tube group, intraocular pressure increased incrementally until the last measurement (14.2 ± 3.9, 18.8 ± 5.6, and 19.7 ± 6.0 mmHg at baseline, 30, and 60 minutes, respectively). The end-pressure difference (intraocular pressure at 60 minutes vs. baseline) was significantly greater in the tube group (5.6 ± 3.6 mmHg; 41% change) than in the trabeculectomy group (3.2 ± 4.7; 23% change; P = 0.03). Intraocular pressure significantly increased after the water-drinking test in both the groups. Intraocular pressure started to decline 30 minutes after the water-drinking test in the trabeculectomy group, while it continued to increase up to 60 minutes in the Tube group. This finding may have implications regarding the efficacy or safety of the procedures in advanced glaucoma patients.

  16. Safety assessment for In-service Pressure Bending Pipe Containing Incomplete Penetration Defects

    NASA Astrophysics Data System (ADS)

    Wang, M.; Tang, P.; Xia, J. F.; Ling, Z. W.; Cai, G. Y.

    2017-12-01

    Incomplete penetration defect is a common defect in the welded joint of pressure pipes. While the safety classification of pressure pipe containing incomplete penetration defects, according to periodical inspection regulations in present, is more conservative. For reducing the repair of incomplete penetration defect, a scientific and applicable safety assessment method for pressure pipe is needed. In this paper, the stress analysis model of the pipe system was established for the in-service pressure bending pipe containing incomplete penetration defects. The local finite element model was set up to analyze the stress distribution of defect location and the stress linearization. And then, the applicability of two assessment methods, simplified assessment and U factor assessment method, to the assessment of incomplete penetration defects located at pressure bending pipe were analyzed. The results can provide some technical supports for the safety assessment of complex pipelines in the future.

  17. The Measurement of Pressure Through Tubes in Pressure Distribution Tests

    NASA Technical Reports Server (NTRS)

    Hemke, Paul E

    1928-01-01

    The tests described in this report were made to determine the error caused by using small tubes to connect orifices on the surface of aircraft to central pressure capsules in making pressure distribution tests. Aluminum tubes of 3/16-inch inside diameter were used to determine this error. Lengths from 20 feet to 226 feet and pressures whose maxima varied from 2 inches to 140 inches of water were used. Single-pressure impulses for which the time of rise of pressure from zero to a maximum varied from 0.25 second to 3 seconds were investigated. The results show that the pressure recorded at the capsule on the far end of the tube lags behind the pressure at the orifice end and experiences also a change in magnitude. For the values used in these tests the time lag and pressure change vary principally with the time of rise of pressure from zero to a maximum and the tube length. Curves are constructed showing the time lag and pressure change. Empirical formulas are also given for computing the time lag. Analysis of pressure distribution tests made on airplanes in flight shows that the recorded pressures are slightly higher than the pressures at the orifice and that the time lag is negligible. The apparent increase in pressure is usually within the experimental error, but in the case of the modern pursuit type of airplane the pressure increase may be 5 per cent. For pressure-distribution tests on airships the analysis shows that the time lag and pressure change may be neglected.

  18. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...

  19. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...

  20. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...

  1. Testing in the years ahead: new pressures and new concerns.

    PubMed

    Bove, J R

    1990-01-01

    In the past, testing by blood banks was intended primarily to ensure product quality or donor safety or to meet existing regulations. As a result of recent pressures, especially the AIDS epidemic, additional reasons to test have become evident. Although some of these reasons are not easy to accept, it is appropriate to review them and to evaluate a new approach to reaching blood bank decisions that have public policy implications. It is suggested that The Institute of Medicine of the National Academy of Sciences sponsor a new and permanent structure for this purpose.

  2. 49 CFR 230.35 - Pressure testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Pressure Testing of Boilers § 230.35 Pressure testing. The temperature of the steam locomotive boiler shall be raised to at least 70 deg. F any time hydrostatic pressure is applied to the boiler. ... 49 Transportation 4 2010-10-01 2010-10-01 false Pressure testing. 230.35 Section 230.35...

  3. Implications of Dynamic Pressure Transducer Mounting Variations on Measurements in Pyrotechnic Test Apparatus

    NASA Technical Reports Server (NTRS)

    Dibbern, Andreas; Crisafulli, Jeffrey; Hagopia, Michael; McDougle, Stephen H.; Saulsberry, Regor L.

    2009-01-01

    Accurate dynamic pressure measurements are often difficult to make within small pyrotechnic devices, and transducer mounting difficulties can cause data anomalies that lead to erroneous conclusions. Delayed initial pressure response followed by data ringing has been observed when using miniaturized pressure transducer mounting adapters required to interface transducers to small test chambers. This delayed pressure response and ringing, combined with a high data acquisition rate, has complicated data analysis. This paper compares the output signal characteristics from different pressure transducer mounting options, where the passage distance from the transducer face to the pyrotechnic chamber is varied in length and diameter. By analyzing the data and understating the associated system dynamics, a more realistic understanding of the actual dynamic pressure variations is achieved. Three pressure transducer mounting configurations (elongated, standard, and face/flush mount) were simultaneously tested using NASA standard initiators in closed volume pressure bombs. This paper also presents results of these pressure transducer mounting configurations as a result of a larger NASA Engineering and Safety Center pyrovalve test project. Results from these tests indicate the improved performance of using face/flush mounted pressure transducers in this application. This type of mounting improved initial pressure measurement response time by approximately 19 s over standard adapter mounting, eliminating most of the lag time; provided a near step-function type initial pressure increase; and greatly reduced data ringing in high data acquisition rate systems. The paper goes on to discuss other issues associated with the firing and instrumentation that are important for the tester to understand.

  4. 9 CFR 113.39 - Cat safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Cat safety tests. 113.39 Section 113... Procedures § 113.39 Cat safety tests. The safety tests provided in this section shall be conducted when... recommended for use in cats. (a) The cat safety test provided in this paragraph shall be used when the Master...

  5. 49 CFR 178.814 - Hydrostatic pressure test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Hydrostatic pressure test. 178.814 Section 178.814... Testing of IBCs § 178.814 Hydrostatic pressure test. (a) General. The hydrostatic pressure test must be... preparation for the hydrostatic pressure test. For metal IBCs, the test must be carried out before the fitting...

  6. Behaving safely under pressure: The effects of job demands, resources, and safety climate on employee physical and psychosocial safety behavior.

    PubMed

    Bronkhorst, Babette

    2015-12-01

    Previous research has shown that employees who experience high job demands are more inclined to show unsafe behaviors in the workplace. In this paper, we examine why some employees behave safely when faced with these demands while others do not. We add to the literature by incorporating both physical and psychosocial safety climate in the job demands and resources (JD-R) model and extending it to include physical and psychosocial variants of safety behavior. Using a sample of 6230 health care employees nested within 52 organizations, we examined the relationship between job demands and (a) resources, (b) safety climate, and (c) safety behavior. We conducted multilevel analyses to test our hypotheses. Job demands (i.e., work pressure), job resources (i.e., job autonomy, supervisor support, and co-worker support) and safety climate (both physical and psychosocial safety climate) are directly associated with, respectively, lower and higher physical and psychosocial safety behavior. We also found some evidence that safety climate buffers the negative impact of job demands (i.e., work-family conflict and job insecurity) on safety behavior and strengthens the positive impact of job resources (i.e., co-worker support) on safety behavior. Regardless of whether the focus is physical or psychological safety, our results show that strengthening the safety climate within an organization can increase employees' safety behavior. Practical implication: An organization's safety climate is an optimal target of intervention to prevent and ameliorate negative physical and psychological health and safety outcomes, especially in times of uncertainty and change. Copyright © 2015 Elsevier Ltd and National Safety Council. All rights reserved.

  7. Advanced Test Reactor Safety Basis Upgrade Lessons Learned Relative to Design Basis Verification and Safety Basis Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. L. Sharp; R. T. McCracken

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR

  8. An in situ tensile test apparatus for polymers in high pressure hydrogen

    DOE PAGES

    Alvine, Kyle J.; Kafentzis, Tyler A.; Pitman, Stan G.; ...

    2014-10-31

    Degradation of material properties by high-pressure hydrogen is an important factor in determining the safety and reliability of materials used in high-pressure hydrogen storage and delivery. Hydrogen damage mechanisms have a time dependence that is linked to hydrogen outgassing after exposure to the hydrogen atmosphere that makes ex situ measurements of mechanical properties problematic. Designing in situ measurement instruments for high-pressure hydrogen is challenging due to known hydrogen incompatibility with many metals and standard high-power motor materials like Nd. Here we detail the design and operation of a solenoid based in situ tensile tester under high-pressure hydrogen environments up tomore » 5,000 psi. Here, modulus data from high-density polyethylene (HDPE) samples tested under high-pressure hydrogen are also reported as compared to baseline measurements taken in air.« less

  9. Pressure Distribution Tests on a Series of Clark Y Biplane Cellules with Special Reference to Stability

    NASA Technical Reports Server (NTRS)

    Noyes, Richard W

    1933-01-01

    The pressure distribution data discussed in this report represents the results of part of an investigation conducted on the factors affecting the aerodynamic safety of airplanes. The present tests were made on semispan, circular-tipped Clark Y airfoil models mounted in the conventional manner on a separation plane. Pressure readings were made simultaneously at all test orifices at each of 20 angles of attack between -8 degrees and +90 degrees. The results of the tests on each wing arrangement are compared on the bases of maximum normal force coefficient, lateral stability at a low rate of roll, and relative longitudinal stability. Tabular data are also presented giving the center of pressure location of each wing.

  10. Safety shield for vacuum/pressure chamber viewing port

    NASA Technical Reports Server (NTRS)

    Shimansky, R. A.; Spencer, R. S. (Inventor)

    1981-01-01

    Observers are protected from flying debris resulting from a failure of a vacuum or pressure chamber viewing port following an implosion or explosion by an optically clear shatter resistant safety shield which spaced apart from the viewing port on the outer surface of the chamber.

  11. 33 CFR 159.109 - Pressure test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the tank, whichever is greater. The tank must hold the water at this pressure for 1 hour with no... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Pressure test. 159.109 Section...) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.109 Pressure test. Any sewage...

  12. Pressure Safety: Advanced Self-Study 30120

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, George

    2016-02-29

    Pressure Safety Advance Self-Study (Course 30120) consists of an introduction, five modules, and a quiz. To receive credit in UTrain for completing this course, you must score 80% or better on the 15-question quiz (check UTrain). Directions for initiating the quiz are appended to the end of this training manual. This course contains several links to LANL websites. UTrain might not support active links, so please copy links into the address line in your browser.

  13. 30 CFR 250.1630 - Safety-system testing and records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1630 Safety... components, and the following: (1) Safety relief valves on the natural gas feed system for power plant... source. (2) The following safety devices (excluding electronic pressure transmitters and level sensors...

  14. Pneumatic pressure wave generator provides economical, simple testing of pressure transducers

    NASA Technical Reports Server (NTRS)

    Gaal, A. E.; Weldon, T. P.

    1967-01-01

    Testing device utilizes the change in pressure about a bias or reference pressure level produced by displacement of a center-driven piston in a closed cylinder. Closely controlled pneumatic pressure waves allow testing under dynamic conditions.

  15. 9 CFR 113.40 - Dog safety tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Dog safety tests. 113.40 Section 113... Procedures § 113.40 Dog safety tests. The safety tests provided in this section shall be conducted when... recommended for use in dogs. Serials which are not found to be satisfactory when tested pursuant to the...

  16. 9 CFR 113.40 - Dog safety tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Dog safety tests. 113.40 Section 113... Procedures § 113.40 Dog safety tests. The safety tests provided in this section shall be conducted when... recommended for use in dogs. Serials which are not found to be satisfactory when tested pursuant to the...

  17. 9 CFR 113.40 - Dog safety tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Dog safety tests. 113.40 Section 113... Procedures § 113.40 Dog safety tests. The safety tests provided in this section shall be conducted when... recommended for use in dogs. Serials which are not found to be satisfactory when tested pursuant to the...

  18. 9 CFR 113.40 - Dog safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Dog safety tests. 113.40 Section 113... Procedures § 113.40 Dog safety tests. The safety tests provided in this section shall be conducted when... recommended for use in dogs. Serials which are not found to be satisfactory when tested pursuant to the...

  19. 9 CFR 113.40 - Dog safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Dog safety tests. 113.40 Section 113... Procedures § 113.40 Dog safety tests. The safety tests provided in this section shall be conducted when... recommended for use in dogs. Serials which are not found to be satisfactory when tested pursuant to the...

  20. 49 CFR 178.605 - Hydrostatic pressure test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... hydraulic pressure (gauge) applied, taken at the top of the receptacle, and determined by any one of the... 49 Transportation 3 2012-10-01 2012-10-01 false Hydrostatic pressure test. 178.605 Section 178.605... Packagings and Packages § 178.605 Hydrostatic pressure test. (a) General. The hydrostatic pressure test must...

  1. 49 CFR 178.605 - Hydrostatic pressure test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... hydraulic pressure (gauge) applied, taken at the top of the receptacle, and determined by any one of the... 49 Transportation 3 2014-10-01 2014-10-01 false Hydrostatic pressure test. 178.605 Section 178.605... Packagings and Packages § 178.605 Hydrostatic pressure test. (a) General. The hydrostatic pressure test must...

  2. 49 CFR 178.814 - Hydrostatic pressure test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., 21B, and 21N, for Packing Group I solids: 250 kPa (36 psig) gauge pressure. (4) For rigid plastic IBC... 49 Transportation 3 2012-10-01 2012-10-01 false Hydrostatic pressure test. 178.814 Section 178.814... Hydrostatic pressure test. (a) General. The hydrostatic pressure test must be conducted for the qualification...

  3. 49 CFR 178.814 - Hydrostatic pressure test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., 21B, and 21N, for Packing Group I solids: 250 kPa (36 psig) gauge pressure. (4) For rigid plastic IBC... 49 Transportation 3 2011-10-01 2011-10-01 false Hydrostatic pressure test. 178.814 Section 178.814... Hydrostatic pressure test. (a) General. The hydrostatic pressure test must be conducted for the qualification...

  4. 49 CFR 178.814 - Hydrostatic pressure test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., 21B, and 21N, for Packing Group I solids: 250 kPa (36 psig) gauge pressure. (4) For rigid plastic IBC... 49 Transportation 3 2014-10-01 2014-10-01 false Hydrostatic pressure test. 178.814 Section 178.814... Hydrostatic pressure test. (a) General. The hydrostatic pressure test must be conducted for the qualification...

  5. 49 CFR 178.814 - Hydrostatic pressure test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., 21B, and 21N, for Packing Group I solids: 250 kPa (36 psig) gauge pressure. (4) For rigid plastic IBC... 49 Transportation 3 2013-10-01 2013-10-01 false Hydrostatic pressure test. 178.814 Section 178.814... Hydrostatic pressure test. (a) General. The hydrostatic pressure test must be conducted for the qualification...

  6. 49 CFR 178.605 - Hydrostatic pressure test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Hydrostatic pressure test. 178.605 Section 178.605... Testing of Non-bulk Packagings and Packages § 178.605 Hydrostatic pressure test. (a) General. The hydrostatic pressure test must be conducted for the qualification of all metal, plastic, and composite...

  7. Toward an understanding of the impact of production pressure on safety performance in construction operations.

    PubMed

    Han, Sanguk; Saba, Farzaneh; Lee, Sanghyun; Mohamed, Yasser; Peña-Mora, Feniosky

    2014-07-01

    It is not unusual to observe that actual schedule and quality performances are different from planned performances (e.g., schedule delay and rework) during a construction project. Such differences often result in production pressure (e.g., being pressed to work faster). Previous studies demonstrated that such production pressure negatively affects safety performance. However, the process by which production pressure influences safety performance, and to what extent, has not been fully investigated. As a result, the impact of production pressure has not been incorporated much into safety management in practice. In an effort to address this issue, this paper examines how production pressure relates to safety performance over time by identifying their feedback processes. A conceptual causal loop diagram is created to identify the relationship between schedule and quality performances (e.g., schedule delays and rework) and the components related to a safety program (e.g., workers' perceptions of safety, safety training, safety supervision, and crew size). A case study is then experimentally undertaken to investigate this relationship with accident occurrence with the use of data collected from a construction site; the case study is used to build a System Dynamics (SD) model. The SD model, then, is validated through inequality statistics analysis. Sensitivity analysis and statistical screening techniques further permit an evaluation of the impact of the managerial components on accident occurrence. The results of the case study indicate that schedule delays and rework are the critical factors affecting accident occurrence for the monitored project. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. 9 CFR 113.41 - Calf safety test.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Calf safety test. 113.41 Section 113.41 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Procedures § 113.41 Calf safety test. The calf safety test provided in this section shall be conducted when...

  9. 9 CFR 113.45 - Sheep safety test.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Sheep safety test. 113.45 Section 113.45 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Procedures § 113.45 Sheep safety test. The sheep safety test provided in this section shall be conducted when...

  10. 9 CFR 113.41 - Calf safety test.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Calf safety test. 113.41 Section 113.41 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Procedures § 113.41 Calf safety test. The calf safety test provided in this section shall be conducted when...

  11. 9 CFR 113.45 - Sheep safety test.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Sheep safety test. 113.45 Section 113.45 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Procedures § 113.45 Sheep safety test. The sheep safety test provided in this section shall be conducted when...

  12. Pressure Build-Up During the Fire Test in Type B(U) Packages Containing Water - 13280

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feldkamp, Martin; Nehrig, Marko; Bletzer, Claus

    The safety assessment of packages for the transport of radioactive materials with content containing liquids requires special consideration. The main focus is on water as supplementary liquid content in Type B(U) packages. A typical content of a Type B(U) package is ion exchange resin, waste of a nuclear power plant, which is not dried, normally only drained. Besides the saturated ion exchange resin, a small amount of free water can be included in these contents. Compared to the safety assessment of packages with dry content, attention must be paid to some more specific issues. An overview of these issues ismore » provided. The physical and chemical compatibility of the content itself and the content compatibility with the packages materials must be demonstrated for the assessment. Regarding the mechanical resistance the package has to withstand the forces resulting from the freezing liquid. The most interesting point, however, is the pressure build-up inside the package due to vaporization. This could for example be caused by radiolysis of the liquid and must be taken into account for the storage period. If the package is stressed by the total inner pressure, this pressure leads to mechanical loads to the package body, the lid and the lid bolts. Thus, the pressure is the driving force on the gasket system regarding the activity release and a possible loss of tightness. The total pressure in any calculation is the sum of partial pressures of different gases which can be caused by different effects. The pressure build-up inside the package caused by the regulatory thermal test (30 min at 800 deg. C), as part of the cumulative test scenario under accident conditions of transport is discussed primarily. To determine the pressure, the temperature distribution in the content must be calculated for the whole period from beginning of the thermal test until cooling-down. In this case, while calculating the temperature distribution, conduction and radiation as well as

  13. 49 CFR 178.605 - Hydrostatic pressure test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Hydrostatic pressure test. 178.605 Section 178.605... Packagings and Packages § 178.605 Hydrostatic pressure test. (a) General. The hydrostatic pressure test must... intended to contain liquids and be performed periodically as specified in § 178.601(e). This test is not...

  14. 49 CFR 178.605 - Hydrostatic pressure test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Hydrostatic pressure test. 178.605 Section 178.605... Packagings and Packages § 178.605 Hydrostatic pressure test. (a) General. The hydrostatic pressure test must... intended to contain liquids and be performed periodically as specified in § 178.601(e). This test is not...

  15. 9 CFR 113.33 - Mouse safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Mouse safety tests. 113.33 Section 113... Procedures § 113.33 Mouse safety tests. One of the mouse safety tests provided in this section shall be... or more ingredients makes the biological product lethal or toxic for mice but not lethal or toxic for...

  16. 9 CFR 113.33 - Mouse safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Mouse safety tests. 113.33 Section 113... Procedures § 113.33 Mouse safety tests. One of the mouse safety tests provided in this section shall be... or more ingredients makes the biological product lethal or toxic for mice but not lethal or toxic for...

  17. 9 CFR 113.33 - Mouse safety tests.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Mouse safety tests. 113.33 Section 113... Procedures § 113.33 Mouse safety tests. One of the mouse safety tests provided in this section shall be... or more ingredients makes the biological product lethal or toxic for mice but not lethal or toxic for...

  18. 9 CFR 113.33 - Mouse safety tests.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Mouse safety tests. 113.33 Section 113... Procedures § 113.33 Mouse safety tests. One of the mouse safety tests provided in this section shall be... or more ingredients makes the biological product lethal or toxic for mice but not lethal or toxic for...

  19. 9 CFR 113.33 - Mouse safety tests.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Mouse safety tests. 113.33 Section 113... Procedures § 113.33 Mouse safety tests. One of the mouse safety tests provided in this section shall be... or more ingredients makes the biological product lethal or toxic for mice but not lethal or toxic for...

  20. 9 CFR 113.44 - Swine safety test.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Swine safety test. 113.44 Section 113... Procedures § 113.44 Swine safety test. The swine safety test provided in this section shall be conducted when.... (1) Inject each of two swine of the minimum age for which the product is recommended with the...

  1. 9 CFR 113.44 - Swine safety test.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Swine safety test. 113.44 Section 113... Procedures § 113.44 Swine safety test. The swine safety test provided in this section shall be conducted when.... (1) Inject each of two swine of the minimum age for which the product is recommended with the...

  2. 9 CFR 113.44 - Swine safety test.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Swine safety test. 113.44 Section 113... Procedures § 113.44 Swine safety test. The swine safety test provided in this section shall be conducted when.... (1) Inject each of two swine of the minimum age for which the product is recommended with the...

  3. 9 CFR 113.44 - Swine safety test.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Swine safety test. 113.44 Section 113... Procedures § 113.44 Swine safety test. The swine safety test provided in this section shall be conducted when.... (1) Inject each of two swine of the minimum age for which the product is recommended with the...

  4. 9 CFR 113.44 - Swine safety test.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Swine safety test. 113.44 Section 113... Procedures § 113.44 Swine safety test. The swine safety test provided in this section shall be conducted when.... (1) Inject each of two swine of the minimum age for which the product is recommended with the...

  5. 33 CFR 159.109 - Pressure test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Pressure test. 159.109 Section 159.109 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.109 Pressure test. Any sewage...

  6. 30 CFR 27.34 - Test for intrinsic safety.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Test for intrinsic safety. 27.34 Section 27.34 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Test Requirements § 27.34 Test for intrinsic safety...

  7. 30 CFR 27.34 - Test for intrinsic safety.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Test for intrinsic safety. 27.34 Section 27.34 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Test Requirements § 27.34 Test for intrinsic safety...

  8. 49 CFR 178.255-12 - Pressure test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Pressure test. 178.255-12 Section 178.255-12... Portable Tanks § 178.255-12 Pressure test. (a) Each completed portable tank prior to application of lining... the test, and applying a pressure of 60 psig. The tank shall be capable of holding the prescribed...

  9. 9 CFR 113.38 - Guinea pig safety test.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Guinea pig safety test. 113.38 Section... Standard Procedures § 113.38 Guinea pig safety test. The guinea pig safety test provided in this section... be injected either intramuscularly or subcutaneously into each of two guinea pigs and the animals...

  10. 9 CFR 113.38 - Guinea pig safety test.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Guinea pig safety test. 113.38 Section... Standard Procedures § 113.38 Guinea pig safety test. The guinea pig safety test provided in this section... be injected either intramuscularly or subcutaneously into each of two guinea pigs and the animals...

  11. 9 CFR 113.38 - Guinea pig safety test.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Guinea pig safety test. 113.38 Section... Standard Procedures § 113.38 Guinea pig safety test. The guinea pig safety test provided in this section... be injected either intramuscularly or subcutaneously into each of two guinea pigs and the animals...

  12. 9 CFR 113.38 - Guinea pig safety test.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Guinea pig safety test. 113.38 Section... Standard Procedures § 113.38 Guinea pig safety test. The guinea pig safety test provided in this section... be injected either intramuscularly or subcutaneously into each of two guinea pigs and the animals...

  13. 9 CFR 113.38 - Guinea pig safety test.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Guinea pig safety test. 113.38 Section... Standard Procedures § 113.38 Guinea pig safety test. The guinea pig safety test provided in this section... be injected either intramuscularly or subcutaneously into each of two guinea pigs and the animals...

  14. Bonded foil pressure transducers

    NASA Astrophysics Data System (ADS)

    Daube, Bernie W.

    The design of bonded-foil pressure transducers is discussed, with consideration given to individual components of both the electrical and the mechanical sections of the bonded-foil pressure transducers, as well as to the temperature control and the accuracy specification of these devices. Particular attention is given to applications of bonded foil pressure transducers, which include solid and liquid rocket engine testing for fuel and exhaust pressures, fuel and oil pressure monitoring on jet engines, and nuclear underground safety system pressure monitoring and nuclear test monitoring. A diagram of a transducer cutaway view is included.

  15. Testing of Full Scale Flight Qualified Kevlar Composite Overwrapped Pressure Vessels

    NASA Technical Reports Server (NTRS)

    Greene, Nathanael; Saulsberry, Regor; Yoder, Tommy; Forsyth, Brad; Thesken, John; Phoenix, Leigh

    2007-01-01

    Many decades ago NASA identified a need for low-mass pressure vessels for carrying various fluids aboard rockets, spacecraft, and satellites. A pressure vessel design known as the composite overwrapped pressure vessel (COPV) was identified to provide a weight savings over traditional single-material pressure vessels typically made of metal and this technology has been in use for space flight applications since the 1970's. A typical vessel design consisted of a thin liner material, typically a metal, overwrapped with a continuous fiber yarn impregnated with epoxy. Most designs were such that the overwrapped fiber would carry a majority of load at normal operating pressures. The weight advantage for a COPV versus a traditional singlematerial pressure vessel contributed to widespread use of COPVs by NASA, the military, and industry. This technology is currently used for personal breathing supply storage, fuel storage for auto and mass transport vehicles and for various space flight and aircraft applications. The NASA Engineering and Safety Center (NESC) was recently asked to review the operation of Kevlar 2 and carbon COPVs to ensure they are safely operated on NASA space flight vehicles. A request was made to evaluate the life remaining on the Kevlar COPVs used on the Space Shuttle for helium and nitrogen storage. This paper provides a review of Kevlar COPV testing relevant to the NESC assessment. Also discussed are some key findings, observations, and recommendations that may be applicable to the COPV user community. Questions raised during the investigations have revealed the need for testing to better understand the stress rupture life and age life of COPVs. The focus of this paper is to describe burst testing of Kevlar COPVs that has been completed as a part of an the effort to evaluate the effects of ageing and shelf life on full scale COPVs. The test articles evaluated in this discussion had a diameter of 22 inches for S/N 014 and 40 inches for S/N 011. The

  16. 9 CFR 113.39 - Cat safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Cat safety tests. 113.39 Section 113.39 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE... Seed Virus is tested for safety. (1) The test animals shall be determined to be susceptible to the...

  17. Safety Assurances at Space Test Centres: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Alarcon Ruiz, Raul; O'Neil, Sean; Valls, Rafel Prades

    2010-09-01

    The European Space Agency’s(ESA) experts in quality, cleanliness and contamination control, safety, test facilities and test methods have accumulated valuable experience during the performance of dedicated audits of space test centres in Europe over a period of 10 years. This paper is limited to a summary of the safety findings and provides a valuable reference to the lessons learned, identifying opportunities for improvement in the areas of risk prevention measures associated to the safety of all test centre personnel, the test specimen, the test facilities and associated infrastructure. Through the analysis of the audit results the authors present what are the main lessons learned, and conclude how an effective safety management system will contribute to successful test campaigns and have a positive impact on the cost and schedule of space projects.

  18. Energy Systems High-Pressure Test Laboratory | Energy Systems Integration

    Science.gov Websites

    Facility | NREL Energy Systems High-Pressure Test Laboratory Energy Systems High-Pressure Test Laboratory In the Energy Systems Integration Facility's High-Pressure Test Laboratory, researchers can safely test high-pressure hydrogen components. Photo of researchers running an experiment with a hydrogen fuel

  19. 42 CFR 84.163 - Man test for gases and vapors; Type C supplied-air respirators, demand and pressure-demand...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Man test for gases and vapors; Type C supplied-air respirators, demand and pressure-demand classes; test requirements. 84.163 Section 84.163 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF...

  20. 49 CFR 178.347-5 - Pressure and leakage test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...

  1. 49 CFR 178.347-5 - Pressure and leakage test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...

  2. 49 CFR 178.347-5 - Pressure and leakage test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...

  3. 49 CFR 178.347-5 - Pressure and leakage test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test... pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection pressure is tank...

  4. Applying Flammability Limit Probabilities and the Normoxic Upward Limiting Pressure Concept to NASA STD-6001 Test 1

    NASA Technical Reports Server (NTRS)

    Olson, Sandra L.; Beeson, Harold; Fernandez-Pello, A. Carlos

    2014-01-01

    Repeated Test 1 extinction tests near the upward flammability limit are expected to follow a Poisson process trend. This Poisson process trend suggests that rather than define a ULOI and MOC (which requires two limits to be determined), it might be better to define a single upward limit as being where 1/e (where e (approx. equal to 2.7183) is the characteristic time of the normalized Poisson process) of the materials burn, or, rounding, where approximately 1/3 of the samples fail the test (and burn). Recognizing that spacecraft atmospheres will not bound the entire oxygen-pressure parameter space, but actually lie along the normoxic atmosphere control band, we can focus the materials flammability testing along this normoxic band. A Normoxic Upward Limiting Pressure (NULP) is defined that determines the minimum safe total pressure for a material within the constant partial pressure control band. Then, increasing this pressure limit by a factor of safety, we can define the material as being safe to use at the NULP + SF (where SF is on the order of 10 kilopascal, based on existing flammability data). It is recommended that the thickest material to be tested with the current Test 1 igniter should be 3 mm thick (1/8 inches) to avoid the problem of differentiating between an ignition limit and a true flammability limit.

  5. Pressured HIV testing "in the name of love": a mixed methods analysis of pressured HIV testing among men who have sex with men in China.

    PubMed

    Ong, Jason J; Wu, Dan; Huang, Wenting; Fu, Hongyun; Desmond, Nicola; Ma, Wei; Kang, Dianmin; Liao, Meizhen; Marley, Gifty; Wei, Chongyi; Tang, Weiming; Liu, Chuncheng; Zhang, Ye; Pan, Stephen W; Yang, Bin; Yang, Ligang; Huang, Shujie; Tucker, Joseph D

    2018-03-01

    HIV testing has rapidly expanded into diverse, decentralized settings. While increasing accessibility to HIV testing is beneficial, it may lead to unintended consequences such as being pressured to test. We examined the frequency, correlates and contexts of pressured HIV testing among Chinese men who have sex with men (MSM) using mixed methods. We conducted an online survey of MSM (N = 1044) in May 2017. Pressured HIV testing was defined as being forced to test for HIV. We conducted logistic regression analysis to determine the associations between pressured HIV testing and socio-demographic and sexual behavioural factors. Follow-up interviews (n = 17) were conducted with men who reported pressured testing and we analysed qualitative data using a thematic analysis approach. Ninety-six men (9.2%) reported experiencing pressure to test for HIV. Regular male sex partners were the most common source of pressure (61%, 59/96), and the most common form of pressure was a threat to end a relationship with the one who was being pressured (39%, 37/96). We found a higher risk of pressured testing in men who had only used HIV self-testing compared to men who had never self-tested (AOR 2.39 (95%CI: 1.38 to 4.14)). However, this relationship was only significant among men with low education (AOR 5.88 (95% CI: 1.92 to 17.99)) and not among men with high education (AOR 1.62 (95% CI: 0.85 to 3.10)). After pressured testing, about half of men subsequently tested for HIV (55%, 53/96) without pressure - none reported being diagnosed with HIV. Consistent with this finding, qualitative data suggest that perceptions of pressure existed on a continuum and depended on the relationship status of the one who pressured them. Although being pressured to test was accompanied by negative feelings, men who were pressured into testing often changed their attitude towards HIV testing, testing behaviours, sexual behaviours and relationship with the one who pressured them to test. Pressured HIV

  6. 33 CFR 154.2180 - Alternative testing program-Generally.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Systems Alternative Analyzer and Pressure Sensor Reliability Testing § 154.2180 Alternative... and pressure sensor safety testing requirements provided by 33 CFR 154.2150(c) and 33 CFR 154.2250(c... 33 CFR 154.2181. (d) All pressure sensors/switches used in a VCS must be tested for safety system...

  7. Portable fixture facilitates pressure testing of instrumentation fittings

    NASA Technical Reports Server (NTRS)

    Olson, G. A.

    1967-01-01

    Portable fixture facilitates pressure testing to detect possible leaks in instrumentation fittings mounted on tank bulkheads. It uses a vacuum cup which seals a pressure regulator adapter around one side of the fitting to be pressure tested. Leakage is detected with a gas sniffer.

  8. SPES-2, AP600 intergral system test S01007 2 inch CL to core make-up tank pressure balance line break

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bacchiani, M.; Medich, C.; Rigamonti, M.

    1995-09-01

    The SPES-2 is a full height, full pressure experimental test facility reproducing the Westinghouse AP600 reactor with a scaling factor of 1/395. The experimental plant, designed and operated by SIET in Piacenza, consists of a full simulation of the AP600 primary core cooling system including all the passive and active safety systems. In 1992, Westinghouse, in cooperation with ENEL (Ente Nazionale per l` Energia Elettrica), ENEA (Enter per le numove Technlogie, l` Energia e l` Ambient), Siet (Societa Informazioni Esperienze Termoidraulich) and ANSALDO developed an experimental program to test the integrated behaviour of the AP600 passive safety systems. The SPES-2more » test matrix, concluded in November 1994, has examined the AP600 passive safety system response for a range of small break LOCAs at different locations on the primary system and on the passive system lines; single steam generator tube ruptures with passive and active safety systems and a main steam line break transient to demonstrate the boration capability of passive safety systems for rapid cooldown. Each of the tests has provided detailed experimental results for verification of the capability of the analysis methods to predict the integrated passive safety system behaviour. Cold and hot shakedown tests have been performed on the facility to check the characteristics of the plant before starting the experimental campaign. The paper first presents a description of the SPES-2 test facility then the main results of S01007 test {open_quotes}2{close_quotes} Cold Leg (CL) to Core Make-up Tank (CMT) pressure balance line break{close_quotes} are reported and compared with predictions performed using RELAP5/mod3/80 obtained by ANSALDO through agreement with U.S.N.R.C. (U.S. Nuclear Regulatory Commission). The SPES-2 nodalization and all the calculations here presented were performed by ANSALDO and sponsored by ENEL as a part of pre-test predictions for SPES-2.« less

  9. Flight testing of a luminescent surface pressure sensor

    NASA Technical Reports Server (NTRS)

    Mclachlan, B. G.; Bell, J. H.; Espina, J.; Gallery, J.; Gouterman, M.; Demandante, C. G. N.; Bjarke, L.

    1992-01-01

    NASA ARC has conducted flight tests of a new type of aerodynamic pressure sensor based on a luminescent surface coating. Flights were conducted at the NASA ARC-Dryden Flight Research Facility. The luminescent pressure sensor is based on a surface coating which, when illuminated with ultraviolet light, emits visible light with an intensity dependent on the local air pressure on the surface. This technique makes it possible to obtain pressure data over the entire surface of an aircraft, as opposed to conventional instrumentation, which can only make measurements at pre-selected points. The objective of the flight tests was to evaluate the effectiveness and practicality of a luminescent pressure sensor in the actual flight environment. A luminescent pressure sensor was installed on a fin, the Flight Test Fixture (FTF), that is attached to the underside of an F-104 aircraft. The response of one particular surface coating was evaluated at low supersonic Mach numbers (M = 1.0-1.6) in order to provide an initial estimate of the sensor's capabilities. This memo describes the test approach, the techniques used, and the pressure sensor's behavior under flight conditions. A direct comparison between data provided by the luminescent pressure sensor and that produced by conventional pressure instrumentation shows that the luminescent sensor can provide quantitative data under flight conditions. However, the test results also show that the sensor has a number of limitations which must be addressed if this technique is to prove useful in the flight environment.

  10. 46 CFR 61.40-6 - Periodic safety tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Periodic safety tests. 61.40-6 Section 61.40-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-6 Periodic safety...

  11. 46 CFR 61.40-6 - Periodic safety tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Periodic safety tests. 61.40-6 Section 61.40-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-6 Periodic safety...

  12. 46 CFR 61.40-6 - Periodic safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Periodic safety tests. 61.40-6 Section 61.40-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-6 Periodic safety...

  13. 46 CFR 61.40-6 - Periodic safety tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Periodic safety tests. 61.40-6 Section 61.40-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-6 Periodic safety...

  14. 46 CFR 61.40-6 - Periodic safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Periodic safety tests. 61.40-6 Section 61.40-6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Design Verification and Periodic Testing of Vital System Automation § 61.40-6 Periodic safety...

  15. ORION - Crew Module Side Hatch: Proof Pressure Test Anomaly Investigation

    NASA Technical Reports Server (NTRS)

    Evernden, Brent A.; Guzman, Oscar J.

    2018-01-01

    The Orion Multi-Purpose Crew Vehicle program was performing a proof pressure test on an engineering development unit (EDU) of the Orion Crew Module Side Hatch (CMSH) assembly. The purpose of the proof test was to demonstrate structural capability, with margin, at 1.5 times the maximum design pressure, before integrating the CMSH to the Orion Crew Module structural test article for subsequent pressure testing. The pressure test was performed at lower pressures of 3 psig, 10 psig and 15.75 psig with no apparent abnormal behavior or leaking. During pressurization to proof pressure of 23.32 psig, a loud 'pop' was heard at 21.3 psig. Upon review into the test cell, it was noted that the hatch had prematurely separated from the proof test fixture, thus immediately ending the test. The proof pressure test was expected be a simple verification but has since evolved into a significant joint failure investigation from both Lockheed Martin and NASA.

  16. 30 CFR 250.448 - What are the BOP pressure tests requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... you pressure test the BOP system, you must conduct a low-pressure and a high-pressure test for each BOP component. You must conduct the low-pressure test before the high-pressure test. Each individual... zero and reinitiate the test. (b) High-pressure test for ram-type BOPs, the choke manifold, and other...

  17. Experimental validation of a Lyapunov-based controller for the plasma safety factor and plasma pressure in the TCV tokamak

    NASA Astrophysics Data System (ADS)

    Mavkov, B.; Witrant, E.; Prieur, C.; Maljaars, E.; Felici, F.; Sauter, O.; the TCV-Team

    2018-05-01

    In this paper, model-based closed-loop algorithms are derived for distributed control of the inverse of the safety factor profile and the plasma pressure parameter β of the TCV tokamak. The simultaneous control of the two plasma quantities is performed by combining two different control methods. The control design of the plasma safety factor is based on an infinite-dimensional setting using Lyapunov analysis for partial differential equations, while the control of the plasma pressure parameter is designed using control techniques for single-input and single-output systems. The performance and robustness of the proposed controller is analyzed in simulations using the fast plasma transport simulator RAPTOR. The control is then implemented and tested in experiments in TCV L-mode discharges using the RAPTOR model predicted estimates for the q-profile. The distributed control in TCV is performed using one co-current and one counter-current electron cyclotron heating actuation.

  18. 49 CFR 178.348-5 - Pressure and leakage test.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...

  19. 49 CFR 178.348-5 - Pressure and leakage test.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...

  20. 49 CFR 178.348-5 - Pressure and leakage test.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...

  1. 49 CFR 178.348-5 - Pressure and leakage test.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test..., and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12, 1989. Redesignated by...

  2. Hazards of Electromagnetic Radiation to Ordnance (HERO) Safety Test

    DTIC Science & Technology

    2013-01-10

    Ordnance Test Procedure (JOTP)-061 Hazards of Electromagnetic Radiation to...DEPARTMENT OF DEFENSE JOINT ORDNANCE TEST PROCEDURE (JOTP)-061 HAZARDS OF ELECTROMAGNETIC RADIATION TO ORDNANCE (HERO) SAFETY...TEST Joint Services Munition Safety Test Working Group Joint Ordnance Test Procedure (JOTP)-061 Hazards of Electromagnetic Radiation

  3. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Automatic control and safety tests. 61.30-20 Section 61... TESTS AND INSPECTIONS Tests and Inspections of Fired Thermal Fluid Heaters § 61.30-20 Automatic control and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  4. Pressure-Sensitive Paints Advance Rotorcraft Design Testing

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The rotors of certain helicopters can spin at speeds as high as 500 revolutions per minute. As the blades slice through the air, they flex, moving into the wind and back out, experiencing pressure changes on the order of thousands of times a second and even higher. All of this makes acquiring a true understanding of rotorcraft aerodynamics a difficult task. A traditional means of acquiring aerodynamic data is to conduct wind tunnel tests using a vehicle model outfitted with pressure taps and other sensors. These sensors add significant costs to wind tunnel testing while only providing measurements at discrete locations on the model's surface. In addition, standard sensor solutions do not work for pulling data from a rotor in motion. "Typical static pressure instrumentation can't handle that," explains Neal Watkins, electronics engineer in Langley Research Center s Advanced Sensing and Optical Measurement Branch. "There are dynamic pressure taps, but your costs go up by a factor of five to ten if you use those. In addition, recovery of the pressure tap readings is accomplished through slip rings, which allow only a limited amount of sensors and can require significant maintenance throughout a typical rotor test." One alternative to sensor-based wind tunnel testing is pressure sensitive paint (PSP). A coating of a specialized paint containing luminescent material is applied to the model. When exposed to an LED or laser light source, the material glows. The glowing material tends to be reactive to oxygen, explains Watkins, which causes the glow to diminish. The more oxygen that is present (or the more air present, since oxygen exists in a fixed proportion in air), the less the painted surface glows. Imaged with a camera, the areas experiencing greater air pressure show up darker than areas of less pressure. "The paint allows for a global pressure map as opposed to specific points," says Watkins. With PSP, each pixel recorded by the camera becomes an optical pressure

  5. 49 CFR 178.346-5 - Pressure and leakage tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... must be the greater of 5.0 psig or 1.5 times the cargo tank MAWP, and the inspection pressure must be... Specifications for Containers for Motor Vehicle Transportation § 178.346-5 Pressure and leakage tests. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test...

  6. 49 CFR 178.346-5 - Pressure and leakage tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be the greater of 5.0 psig or 1.5 times the cargo tank MAWP, and the inspection pressure must be... Specifications for Containers for Motor Vehicle Transportation § 178.346-5 Pressure and leakage tests. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test...

  7. 49 CFR 178.346-5 - Pressure and leakage tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... must be the greater of 5.0 psig or 1.5 times the cargo tank MAWP, and the inspection pressure must be... Specifications for Containers for Motor Vehicle Transportation § 178.346-5 Pressure and leakage tests. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test...

  8. 49 CFR 178.346-5 - Pressure and leakage tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... must be the greater of 5.0 psig or 1.5 times the cargo tank MAWP, and the inspection pressure must be... Specifications for Containers for Motor Vehicle Transportation § 178.346-5 Pressure and leakage tests. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure test. Test...

  9. Remotely operated high pressure valve protects test personnel

    NASA Technical Reports Server (NTRS)

    Howland, B. T.

    1967-01-01

    High pressure valve used in testing certain spacecraft systems is safely opened and closed by a remotely stationed operator. The valve is self-regulating in that if the incoming pressure drops below a desired value the valve will automatically close, warning the operator that the testing pressure has dropped to an undesired level.

  10. Orion ECLSS/Suit System - Ambient Pressure Integrated Suit Test

    NASA Technical Reports Server (NTRS)

    Barido, Richard A.

    2012-01-01

    The Ambient Pressure Integrated Suit Test (APIST) phase of the integrated system testing of the Orion Vehicle Atmosphere Revitalization System (ARS) technology was conducted for the Multipurpose Crew Vehicle (MPCV) Program within the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate. Crew and Thermal Systems Division performed this test in the eleven-foot human-rated vacuum chamber at the NASA Johnson Space Center. This testing is the first phase of suit loop testing to demonstrate the viability of the Environmental Control and Life Support System (ECLSS) being developed for Orion. APIST is the first in a series, which will consist of testing development hardware including the Carbon dioxide and Moisture Removal Amine Swing-bed (CAMRAS) and the air revitalization loop fan with human test subjects in pressure suits at varying suit pressures. Follow-on testing, to be conducted in 2013, will utilize the CAMRAS and a development regulator with human test subjects in pressure suits at varying cabin and suit pressures. This paper will discuss the results and findings of APIST and will also discuss future testing.

  11. 49 CFR 178.345-13 - Pressure and leakage tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Pressure and leakage tests. 178.345-13 Section 178... PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.345-13 Pressure and leakage tests. (a) Each cargo tank must be pressure and leakage tested in accordance with this section and...

  12. 49 CFR 179.200-23 - Tests of pressure relief valves.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS REGULATIONS SPECIFICATIONS FOR TANK CARS Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW and 115AW) § 179.200...

  13. System Study: High-Pressure Safety Injection 1998-2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schroeder, John Alton

    2015-12-01

    This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 69 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the HPSI results.

  14. 49 CFR 178.347-5 - Pressure and leakage test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.347-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure..., the test pressure must be 40 psig or 1.5 times tank MAWP, whichever is greater, and the inspection...

  15. 33 CFR 159.129 - Safety: Ignition prevention test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Safety: Ignition prevention test. 159.129 Section 159.129 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.129 Safety: Ignition...

  16. Pressure Testing of a Minimum Gauge PRSEUS Panel

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew J.; Rouse, Marshall; Linton, Kim A.; Li, Victor P.

    2011-01-01

    Advanced aircraft configurations that have been developed to increase fuel efficiency require advanced, novel structural concepts capable of handling the unique load conditions that arise. One such concept is the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) developed by the Boeing Company. The PRSEUS concept is being investigated by NASA s Environmentally Responsible Aviation (ERA) Program for use in a hybrid-wing body (HWB) aircraft. This paper summarizes the analysis and test of a PRSEUS panel subjected to internal pressure, the first such pressure test for this structural concept. The pressure panel used minimum gauge skin, with stringer and frame configurations consistent with previous PRSEUS tests. Analysis indicated that for the minimum gauge skin panel, the stringer locations exhibit fairly linear response, but the skin bays between the stringers exhibit nonlinear response. Excellent agreement was seen between nonlinear analysis and test results in the critical portion at the center of the panel. The pristine panel was capable of withstanding the required 18.4 psi pressure load condition without exhibiting any damage. The impacted panel was capable of withstanding a pressure load in excess of 28 psi before initial failure occurred at the center stringer, and the panel was capable of sustaining increased pressure load after the initial failure. This successful PRSEUS panel pressure panel test was a critical step in the building block approach for enabling the use of this advanced structural concept on future aircraft, such as the HWB.

  17. 49 CFR 178.346-5 - Pressure and leakage tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... test pressure must be the greater of 5.0 psig or 1.5 times the cargo tank MAWP, and the inspection... PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.346-5 Pressure and leakage tests. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure...

  18. Pressure Venting Tests of Phenolic Impregnated Carbon Ablator (PICA)

    NASA Technical Reports Server (NTRS)

    Blosser, Max L.; Knutson, Jeffrey R.

    2015-01-01

    A series of tests was devised to investigate the pressure venting behavior of one of the candidate ablators for the Orion capsule heat shield. Three different specimens of phenolic impregnated carbon ablator (PICA) were instrumented with internal pressure taps and subjected to rapid pressure changes from near vacuum to one atmosphere and simulated Orion ascent pressure histories. The specimens vented rapidly to ambient pressure and sustained no detectable damage during testing. Peak pressure differences through the thickness of a 3-inch-thick specimen were less than 1 psi during a simulated ascent pressure history.

  19. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  20. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  1. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC... and safety tests. Operational tests and checks of all safety and limit controls, combustion controls...

  2. [Microcystin safety study during Cyanobacteria removal by pressure enhanced coagulation process].

    PubMed

    Jiang, Xin-Yue; Luan, Qing; Cong, Hai-Bing; Xu, Si-Tao; Liu, Yu-Jiao; Zhu, Xue-Yuan

    2014-11-01

    Pressure enhanced coagulation and sedimentation technique is an effective way for blue algae treatment. It is not clear whether Cyanobacteria balloon rupture will cause Cyanobacteria cells rupture, resulting in high intracellular concentrations of microcystin LR leak into the water, affecting drinking water safety. Therefore, in this study experimental comparative study of pressure and pre-oxidation of water containing Cyanobacteria was carried out to examine the microcystin LR concentration changes and Cyanobacteria removal efficiency. The results showed that microcystin concentration increase was not significant by the pre-treatment with Cyanobacteria water pressure, while the pre-oxidation process caused a significant increase in the concentration of microcystin. After 0.5-0.8 MPa pressure coagulation and sedimentation, removal of Cyanobacteria basically was over 90%, up to 93.5%, while the removal rate by pre-oxidation was low and unstable. Effluent turbidity is also significantly better in the pre-pressure method than the pre-oxidation. The results indicated that pressure enhanced coagulation is a safe and reliable method for Cyanobacteria removal.

  3. The Pieper-Zulkowski pressure ulcer knowledge test.

    PubMed

    Pieper, Barbara; Zulkowski, Karen

    2014-09-01

    To describe the development and initial testing of the Pieper-Zulkowski Pressure Ulcer Knowledge Test (PZ-PUKT). Cross-sectional, instrument testing. Hospital association pressure ulcer educational program conference. Pressure ulcer research and guidelines from the last 5 years were examined for test item content. The initial PZ-PUKT had 115 items; response options were "true," "false," and "don't know." Registered nurses (N = 108) were randomly divided into 2 groups to take either the 60 prevention/risk and staging items or the 55 wound description items. Analyses of these responses resulted in 72 items, which were administered in total to a second cohort of 98 nurses for reliability. Cronbach's α was .80 for the 72-item PZ-PUKT. Cronbach's α values for the subscales were as follows: staging, .67; wound description, .64; and prevention/risk, .56. The mean correct scores were as follows: total, 80%; prevention, 77%; staging, 86%; and wound description, 77%. Nurses with wound care certification scored significantly higher on the PZ-PUKT than did nurses with other clinical certifications or with nurses who lacked certification. The PZ-PUKT has updated content about pressure ulcer prevention/risk, staging, and wound description. Reliability values are highest for the total test. Further use of the instrument in diverse settings will add to reliability testing and may provide direction for determination of a passing cutoff score.

  4. 33 CFR 159.95 - Safety.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Safety. 159.95 Section 159.95... SANITATION DEVICES Design, Construction, and Testing § 159.95 Safety. (a) Each device must— (1) Be free of... explosion or over pressurization as a result of an accumulation of gases; and (3) Meet all other safety...

  5. 78 FR 54510 - New Entrant Safety Assurance Program Operational Test

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ...-0298] New Entrant Safety Assurance Program Operational Test AGENCY: Federal Motor Carrier Safety...) announces an operational test of procedural changes to the New Entrant Safety Assurance Program. The operational test began in July 2013 and will be in effect for up to 12 months. It is applicable to new entrant...

  6. Tests Of Array Of Flush Pressure Sensors

    NASA Technical Reports Server (NTRS)

    Larson, Larry J.; Moes, Timothy R.; Siemers, Paul M., III

    1992-01-01

    Report describes tests of array of pressure sensors connected to small orifices flush with surface of 1/7-scale model of F-14 airplane in wind tunnel. Part of effort to determine whether pressure parameters consisting of various sums, differences, and ratios of measured pressures used to compute accurately free-stream values of stagnation pressure, static pressure, angle of attack, angle of sideslip, and mach number. Such arrays of sensors and associated processing circuitry integrated into advanced aircraft as parts of flight-monitoring and -controlling systems.

  7. Apparatus for testing high pressure injector elements

    NASA Technical Reports Server (NTRS)

    Myers, William Neill (Inventor); Scott, Ewell M. (Inventor); Forbes, John C. (Inventor); Shadoan, Michael D. (Inventor)

    1995-01-01

    An apparatus for testing and evaluating the spray pattern of high pressure fuel injector elements for use in supplying fuel to combustion engines is presented. Prior art fuel injector elements were normally tested by use of low pressure apparatuses which did not provide a purge to prevent mist from obscuring the injector element or to prevent frosting of the view windows; could utilize only one fluid during each test; and had their viewing ports positioned one hundred eighty (180 deg) apart, thus preventing optimum use of laser diagnostics. The high pressure fluid injector test apparatus includes an upper hub, an upper weldment or housing, a first clamp and stud/nut assembly for securing the upper hub to the upper weldment, a standoff assembly within the upper weldment, a pair of window housings having view glasses within the upper weldment, an injector block assembly and purge plate within the upper weldment for holding an injector element to be tested and evaluated, a lower weldment or housing, a second clamp and stud/nut assembly for securing the lower weldment to the upper hub, a third clamp and stud/nut assembly for securing the lower hub to the lower weldment, mechanisms for introducing fluid under high pressure for testing an injector element, and mechanisms for purging the apparatus to prevent frosting of view glasses within the window housings and to permit unobstructed viewing of the injector element.

  8. Apparatus for testing high pressure injector elements

    NASA Technical Reports Server (NTRS)

    Myers, William Neill (Inventor); Scott, Ewell M. (Inventor); Forbes, John C. (Inventor); Shadoan, Michael D. (Inventor)

    1993-01-01

    An apparatus for testing and evaluating the spray pattern of high pressure fuel injector elements for use in supplying fuel to combustion engines is presented. Prior art fuel injector elements were normally tested by use of low pressure apparatuses which did not provide a purge to prevent mist from obscuring the injector element or to prevent frosting of the view windows; could utilize only one fluid during each test; and had their viewing ports positioned one hundred eighty (180 deg) apart, thus preventing optimum use of laser diagnostics. The high pressure fluid injector test apparatus includes an upper hub, an upper weldment or housing, a first clamp and stud/nut assembly for securing the upper hub to the upper weldment, a standoff assembly within the upper weldment, a pair of window housings having view glasses within the upper weldment, an injector block assembly and purge plate within the upper weldment for holding an injector element to be tested and evaluated, a lower weldment or housing, a second clamp and stud/nut assembly for securing the lower weldment to the upper weldment, a lower hub, a third clamp and stud/nut assembly for securing the lower hub to the lower weldment, mechanisms for introducing fluid under high pressure for testing an injector element, and mechanisms for purging the apparatus to prevent frosting of view glasses within the window housings and to permit unobstructed viewing of the injector element.

  9. 30 CFR 35.21 - Temperature-pressure spray-ignition tests.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Temperature-pressure spray-ignition tests. 35..., EVALUATION, AND APPROVAL OF MINING PRODUCTS FIRE-RESISTANT HYDRAULIC FLUIDS Test Requirements § 35.21 Temperature-pressure spray-ignition tests. (a) Purpose. The purpose of this test shall be to determine the...

  10. 30 CFR 35.21 - Temperature-pressure spray-ignition tests.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Temperature-pressure spray-ignition tests. 35..., EVALUATION, AND APPROVAL OF MINING PRODUCTS FIRE-RESISTANT HYDRAULIC FLUIDS Test Requirements § 35.21 Temperature-pressure spray-ignition tests. (a) Purpose. The purpose of this test shall be to determine the...

  11. 30 CFR 35.21 - Temperature-pressure spray-ignition tests.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Temperature-pressure spray-ignition tests. 35..., EVALUATION, AND APPROVAL OF MINING PRODUCTS FIRE-RESISTANT HYDRAULIC FLUIDS Test Requirements § 35.21 Temperature-pressure spray-ignition tests. (a) Purpose. The purpose of this test shall be to determine the...

  12. 30 CFR 35.21 - Temperature-pressure spray-ignition tests.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Temperature-pressure spray-ignition tests. 35..., EVALUATION, AND APPROVAL OF MINING PRODUCTS FIRE-RESISTANT HYDRAULIC FLUIDS Test Requirements § 35.21 Temperature-pressure spray-ignition tests. (a) Purpose. The purpose of this test shall be to determine the...

  13. Centaur space vehicle pressurized propellant feed system tests

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Engine firing tests, using a full-scale flight-weight vehicle, were performed to evaluate a pressurized propellant feed system for the Centaur. The pressurant gases used were helium and hydrogen. The system was designed to replace the boost pumps currently used on Centaur. Two liquid oxygen tank pressurization modes were studied: (1) directly into the ullage and (2) below the propellant surface. Test results showed the two Centaur RL10 engines could be started and run over the range of expected flight variables. No system instabilities were encountered. Measured pressurization gas quantities agreed well with analytically predicted values.

  14. Apparatus and method for pressure testing closure disks

    DOEpatents

    Merten, Jr., Charles W.

    1992-01-21

    A method and device for testing the burst pressure of closure disks which provides high pressure to both sides of a disk and rapidly releases pressure from one side thereof causing a high rate of change of pressure. A hollow notched plug allows the rapid release of pressure upon rupturing. A tensile load is transmitted by a piston in combination with fluid pressure to the hollow notched plug.

  15. High-Pressure Oxygen Test Evaluations

    NASA Technical Reports Server (NTRS)

    Schwinghamer, R. J.; Key, C. F.

    1974-01-01

    The relevance of impact sensitivity testing to the development of the space shuttle main engine is discussed in the light of the special requirements for the engine. The background and history of the evolution of liquid and gaseous oxygen testing techniques and philosophy is discussed also. The parameters critical to reliable testing are treated in considerable detail, and test apparatus and procedures are described and discussed. Materials threshold sensitivity determination procedures are considered and a decision logic diagram for sensitivity threshold determination was plotted. Finally, high-pressure materials sensitivity test data are given for selected metallic and nonmetallic materials.

  16. Testing Chemical Safety: What Is Needed to Ensure the Widespread Application of Non-animal Approaches?

    PubMed Central

    Burden, Natalie; Sewell, Fiona; Chapman, Kathryn

    2015-01-01

    Scientists face growing pressure to move away from using traditional animal toxicity tests to determine whether manufactured chemicals are safe. Numerous ethical, scientific, business, and legislative incentives will help to drive this shift. However, a number of hurdles must be overcome in the coming years before non-animal methods are adopted into widespread practice, particularly from regulatory, scientific, and global perspectives. Several initiatives are nevertheless underway that promise to increase the confidence in newer alternative methods, which will support the move towards a future in which less data from animal tests is required in the assessment of chemical safety. PMID:26018957

  17. 49 CFR 195.305 - Testing of components.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.305 Testing of components. (a) Each pressure test under § 195.302 must test...

  18. 49 CFR 195.305 - Testing of components.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.305 Testing of components. (a) Each pressure test under § 195.302 must test...

  19. 49 CFR 195.305 - Testing of components.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.305 Testing of components. (a) Each pressure test under § 195.302 must test...

  20. 49 CFR 195.305 - Testing of components.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.305 Testing of components. (a) Each pressure test under § 195.302 must test...

  1. 49 CFR 195.305 - Testing of components.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.305 Testing of components. (a) Each pressure test under § 195.302 must test...

  2. Initial results from safety testing of US AGR-2 irradiation test fuel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, Robert Noel; Hunn, John D.; Baldwin, Charles A.

    Two cylindrical compacts containing tristructural isotropic (TRISO)-coated particles with kernels that contained a mixture of uranium carbide and uranium oxide (UCO) and two compacts with UO 2-kernel TRISO particles have undergone 1600°C safety testing. These compacts were irradiated in the US Advanced Gas Reactor Fuel Development and Qualification Program's second irradiation test (AGR-2). The time-dependent releases of several radioisotopes ( 110mAg, 134Cs, 137Cs, 154Eu, 155Eu, 90Sr, and 85Kr) were monitored while heating the fuel specimens to 1600°C in flowing helium for 300 h. The UCO compacts behaved similarly to previously reported 1600°C-safety-tested UCO compacts from the AGR-1 irradiation. No failedmore » TRISO or failed SiC were detected (based on krypton and cesium release), and cesium release through intact SiC was very low. Release behavior of silver, europium, and strontium appeared to be dominated by inventory originally released through intact coating layers during irradiation but retained in the compact matrix until it was released during safety testing. Both UO 2 compacts exhibited cesium release from multiple particles whose SiC failed during the safety test. Europium and strontium release from these two UO 2 compacts appeared to be dominated by release from the particles with failed SiC. Silver release was characteristically like the release from the UCO compacts in that an initial release of the majority of silver trapped in the matrix occurred during ramping to 1600°C. However, additional silver release was observed later in the safety testing due to the UO 2 TRISO with failed SiC. Failure of the SiC layer in the UO 2 fuel appears to have been dominated by CO corrosion, as opposed to the palladium degradation observed in AGR-1 UCO fuel.« less

  3. Initial results from safety testing of US AGR-2 irradiation test fuel

    DOE PAGES

    Morris, Robert Noel; Hunn, John D.; Baldwin, Charles A.; ...

    2017-08-18

    Two cylindrical compacts containing tristructural isotropic (TRISO)-coated particles with kernels that contained a mixture of uranium carbide and uranium oxide (UCO) and two compacts with UO 2-kernel TRISO particles have undergone 1600°C safety testing. These compacts were irradiated in the US Advanced Gas Reactor Fuel Development and Qualification Program's second irradiation test (AGR-2). The time-dependent releases of several radioisotopes ( 110mAg, 134Cs, 137Cs, 154Eu, 155Eu, 90Sr, and 85Kr) were monitored while heating the fuel specimens to 1600°C in flowing helium for 300 h. The UCO compacts behaved similarly to previously reported 1600°C-safety-tested UCO compacts from the AGR-1 irradiation. No failedmore » TRISO or failed SiC were detected (based on krypton and cesium release), and cesium release through intact SiC was very low. Release behavior of silver, europium, and strontium appeared to be dominated by inventory originally released through intact coating layers during irradiation but retained in the compact matrix until it was released during safety testing. Both UO 2 compacts exhibited cesium release from multiple particles whose SiC failed during the safety test. Europium and strontium release from these two UO 2 compacts appeared to be dominated by release from the particles with failed SiC. Silver release was characteristically like the release from the UCO compacts in that an initial release of the majority of silver trapped in the matrix occurred during ramping to 1600°C. However, additional silver release was observed later in the safety testing due to the UO 2 TRISO with failed SiC. Failure of the SiC layer in the UO 2 fuel appears to have been dominated by CO corrosion, as opposed to the palladium degradation observed in AGR-1 UCO fuel.« less

  4. 75 FR 9018 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2010-0034] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  5. 77 FR 2606 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket ID PHMSA-2012-0004] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... pipelines and operators of liquefied natural gas facilities must select and test a percentage of covered...

  6. High Pressure Composite Overwrapped Pressure Vessel (COPV) Development Tests at Cryogenic Temperatures

    NASA Technical Reports Server (NTRS)

    Ray, David M.; Greene, Nathanael J.; Revilock, Duane; Sneddon, Kirk; Anselmo, Estelle

    2008-01-01

    Development tests were conducted to evaluate the performance of 2 COPV designs at cryogenic temperatures. This allows for risk reductions for critical components for a Gaseous Helium (GHe) Pressurization Subsystem for an Advanced Propulsion System (APS) which is being proposed for NASA s Constellation project and future exploration missions. It is considered an advanced system since it uses Liquid Methane (LCH4) as the fuel and Liquid Oxygen (LO2) as the oxidizer for the propellant combination mixture. To avoid heating of the propellants to prevent boil-off, the GHe will be stored at subcooled temperatures equivalent to the LO2 temperature. Another advantage of storing GHe at cryogenic temperatures is that more mass of the pressurized GHe can be charged in to a vessel with a smaller volume, hence a smaller COPV, and this creates a significant weight savings versus gases at ambient temperatures. The major challenge of this test plan is to verify that a COPV can safely be used for spacecraft applications to store GHe at a Maximum Operating Pressure (MOP) of 4,500 psig at 140R to 160R (-320 F to -300 F). The COPVs for these tests were provided by ARDE , Inc. who developed a resin system to use at cryogenic conditions and has the capabilities to perform high pressure testing with LN2.

  7. 49 CFR 178.348-5 - Pressure and leakage test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PACKAGINGS Specifications for Containers for Motor Vehicle Transportation § 178.348-5 Pressure and leakage test. (a) Each cargo tank must be tested in accordance with § 178.345-13 and this section. (b) Pressure....5 times tank MAWP, and the inspection pressure is tank MAWP. [Amdt. 178-89, 54 FR 25032, June 12...

  8. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Pressure and vacuum pulse test... (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and vacuum pulse test. Liquid retention components of the device with manufacturer specified venting...

  9. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Pressure and vacuum pulse test... (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and vacuum pulse test. Liquid retention components of the device with manufacturer specified venting...

  10. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Pressure and vacuum pulse test... (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and vacuum pulse test. Liquid retention components of the device with manufacturer specified venting...

  11. Liquid Oxygen Thermodynamic Vent System Testing with Helium Pressurization

    NASA Technical Reports Server (NTRS)

    VanDresar, Neil T.

    2014-01-01

    This report presents the results of several thermodynamic vent system (TVS) tests with liquid oxygen plus a test with liquid nitrogen. In all tests, the liquid was heated above its normal boiling point to 111 K for oxygen and 100 K for nitrogen. The elevated temperature was representative of tank conditions for a candidate lunar lander ascent stage. An initial test series was conducted with saturated oxygen liquid and vapor at 0.6 MPa. The initial series was followed by tests where the test tank was pressurized with gaseous helium to 1.4 to 1.6 MPa. For these tests, the helium mole fraction in the ullage was quite high, about 0.57 to 0.62. TVS behavior is different when helium is present than when helium is absent. The tank pressure becomes the sum of the vapor pressure and the partial pressure of helium. Therefore, tank pressure depends not only on temperature, as is the case for a pure liquid-vapor system, but also on helium density (i.e., the mass of helium divided by the ullage volume). Thus, properly controlling TVS operation is more challenging with helium pressurization than without helium pressurization. When helium was present, the liquid temperature would rise with each successive TVS cycle if tank pressure was kept within a constant control band. Alternatively, if the liquid temperature was maintained within a constant TVS control band, the tank pressure would drop with each TVS cycle. The final test series, which was conducted with liquid nitrogen pressurized with helium, demonstrated simultaneous pressure and temperature control during TVS operation. The simultaneous control was achieved by systematic injection of additional helium during each TVS cycle. Adding helium maintained the helium partial pressure as the liquid volume decreased because of TVS operation. The TVS demonstrations with liquid oxygen pressurized with helium were conducted with three different fluid-mixer configurations-a submerged axial jet mixer, a pair of spray hoops in the tank

  12. Calculated shock pressures in the aquarium test

    NASA Astrophysics Data System (ADS)

    Johnson, J. N.

    1982-04-01

    A new method of analysis has been developed for determintion of shock pressures in aquarium tests on commercial explosives. This test consists of photographing the expanding cylindrical tube wall (which contains the detonation products) and the shock wave in water surrounding the explosive charge. By making a least-squares fit to the shock-front data, it is possible to determine the peak shock-front pressure as a function of distance from the cylinder wall. This has been done for 10-cm and 20-cm-diam ANFO (ammonium nitrate/fuel oil) and aluminized ANFO (7.5 wt% Al) aquarium test data.

  13. 30 CFR 250.804 - Production safety-system testing and records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Production safety-system testing and records... Gas Production Safety Systems § 250.804 Production safety-system testing and records. (a) Inspection... devices operating at temperatures which could ignite a methane-air mixture shall not be used. All...

  14. 30 CFR 250.804 - Production safety-system testing and records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Production safety-system testing and records... Gas Production Safety Systems § 250.804 Production safety-system testing and records. (a) Inspection... devices operating at temperatures which could ignite a methane-air mixture shall not be used. All...

  15. 30 CFR 250.804 - Production safety-system testing and records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Production safety-system testing and records... Gas Production Safety Systems § 250.804 Production safety-system testing and records. (a) Inspection... devices operating at temperatures which could ignite a methane-air mixture shall not be used. All...

  16. Constant pressure high throughput membrane permeation testing system

    DOEpatents

    Albenze, Erik J.; Hopkinson, David P.; Luebke, David R.

    2014-09-02

    The disclosure relates to a membrane testing system for individual evaluation of a plurality of planar membranes subjected to a feed gas on one side and a sweep gas on a second side. The membrane testing system provides a pressurized flow of a feed and sweep gas to each membrane testing cell in a plurality of membrane testing cells while a stream of retentate gas from each membrane testing cell is ported by a retentate multiport valve for sampling or venting, and a stream of permeate gas from each membrane testing cell is ported by a permeate multiport valve for sampling or venting. Back pressure regulators and mass flow controllers act to maintain substantially equivalent gas pressures and flow rates on each side of the planar membrane throughout a sampling cycle. A digital controller may be utilized to position the retentate and permeate multiport valves cyclically, allowing for gas sampling of different membrane cells over an extended period of time.

  17. 21 CFR 610.11a - Inactivated influenza vaccine, general safety test.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 7 2013-04-01 2013-04-01 false Inactivated influenza vaccine, general safety test... Inactivated influenza vaccine, general safety test. For inactivated influenza vaccine, the general safety test... subcutaneous or intraperitoneal injection of 5.0 milliliters of inactivated influenza vaccine into each guinea...

  18. 21 CFR 610.11a - Inactivated influenza vaccine, general safety test.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 7 2011-04-01 2010-04-01 true Inactivated influenza vaccine, general safety test... Inactivated influenza vaccine, general safety test. For inactivated influenza vaccine, the general safety test... subcutaneous or intraperitoneal injection of 5.0 milliliters of inactivated influenza vaccine into each guinea...

  19. 21 CFR 610.11a - Inactivated influenza vaccine, general safety test.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 7 2012-04-01 2012-04-01 false Inactivated influenza vaccine, general safety test... Inactivated influenza vaccine, general safety test. For inactivated influenza vaccine, the general safety test... subcutaneous or intraperitoneal injection of 5.0 milliliters of inactivated influenza vaccine into each guinea...

  20. 21 CFR 610.11a - Inactivated influenza vaccine, general safety test.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 7 2014-04-01 2014-04-01 false Inactivated influenza vaccine, general safety test... Inactivated influenza vaccine, general safety test. For inactivated influenza vaccine, the general safety test... subcutaneous or intraperitoneal injection of 5.0 milliliters of inactivated influenza vaccine into each guinea...

  1. Application of a support vector machine algorithm to the safety precaution technique of medium-low pressure gas regulators

    NASA Astrophysics Data System (ADS)

    Hao, Xuejun; An, Xaioran; Wu, Bo; He, Shaoping

    2018-02-01

    In the gas pipeline system, safe operation of a gas regulator determines the stability of the fuel gas supply, and the medium-low pressure gas regulator of the safety precaution system is not perfect at the present stage in the Beijing Gas Group; therefore, safety precaution technique optimization has important social and economic significance. In this paper, according to the running status of the medium-low pressure gas regulator in the SCADA system, a new method for gas regulator safety precaution based on the support vector machine (SVM) is presented. This method takes the gas regulator outlet pressure data as input variables of the SVM model, the fault categories and degree as output variables, which will effectively enhance the precaution accuracy as well as save significant manpower and material resources.

  2. 49 CFR 179.500-16 - Tests of pressure relief devices.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...

  3. 49 CFR 179.500-16 - Tests of pressure relief devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...

  4. 49 CFR 179.500-16 - Tests of pressure relief devices.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...

  5. 49 CFR 179.500-16 - Tests of pressure relief devices.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Tests of pressure relief devices. 179.500-16... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be tested by air...

  6. Reduced Pressure Cabin Testing of the Orion Atmosphere Revitalization Technology

    NASA Technical Reports Server (NTRS)

    Button, Amy; Sweterlitsch, Jeffrey

    2011-01-01

    An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Atmosphere Revitalization System for moderate duration missions of the Orion Multipurpose Crew Vehicle. In previous years at this conference, reports were presented on extensive Johnson Space Center testing of this technology in a sea-level pressure environment with simulated and actual human metabolic loads in both open and closed-loop configurations. In 2011, the technology was tested in an open cabin-loop configuration at ambient and two sub-ambient pressures to compare the performance of the system to the results of previous tests at ambient pressure. The testing used a human metabolic simulator with a different type of water vapor generation than previously used, which added some unique challenges in the data analysis. This paper summarizes the results of: baseline and some matrix testing at all three cabin pressures, increased vacuum regeneration line pressure with a high metabolic load, a set of tests studying CO2 and water vapor co-adsorption effects relative to model-predicted performance, and validation tests of flight program computer model predictions with specific operating conditions.

  7. Reduced Pressure Cabin Testing of the Orion Atmosphere Revitalization Technology

    NASA Technical Reports Server (NTRS)

    Button, Amy; Sweterlisch, Jeffery J.

    2013-01-01

    An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Atmosphere Revitalization System for moderate duration missions of the Orion Multipurpose Crew Vehicle. In previous years at this conference, reports were presented on extensive Johnson Space Center testing of this technology in a sea-level pressure environment with simulated and actual human metabolic loads in both open and closed-loop configurations. In 2011, the technology was tested in an open cabin-loop configuration at ambient and two sub-ambient pressures to compare the performance of the system to the results of previous tests at ambient pressure. The testing used a human metabolic simulator with a different type of water vapor generation than previously used, which added some unique challenges in the data analysis. This paper summarizes the results of: baseline and some matrix testing at all three cabin pressures, increased vacuum regeneration line pressure with a high metabolic load, a set of tests studying CO2 and water vapor co-adsorption effects relative to model-predicted performance, and validation tests of flight program computer model predictions with specific operating conditions.

  8. 46 CFR 61.30-20 - Automatic control and safety tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Automatic control and safety tests. 61.30-20 Section 61.30-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PERIODIC TESTS AND INSPECTIONS Tests and Inspections of Fired Thermal Fluid Heaters § 61.30-20 Automatic control and safety tests. Operational tests and check...

  9. Safety testing of lithium cells

    NASA Technical Reports Server (NTRS)

    Liberto, Nick

    1991-01-01

    Safety testing is intended to simulate, under laboratory conditions and controls, situations that will subject a cell to externally induced stress. The stresses can occur at any time during the useful life of the cell, from the time of manufacture until it is expended during mission deployment. Abuse testing can be divided into three major categories: Electrical, Mechanical, and Thermal. Although electrical abuses are generally found to occur during handling or deployment, Mechanical and Thermal stresses can be induced during transportation and storage. Therefore, it would be prudent to include predicted environmental exposure as part of the test plan. In the selection of a test program. specific test requirements should be tailored to meet the predicted mission requirements.

  10. Safety testing of lithium cells

    NASA Astrophysics Data System (ADS)

    Liberto, Nick

    1991-05-01

    Safety testing is intended to simulate, under laboratory conditions and controls, situations that will subject a cell to externally induced stress. The stresses can occur at any time during the useful life of the cell, from the time of manufacture until it is expended during mission deployment. Abuse testing can be divided into three major categories: Electrical, Mechanical, and Thermal. Although electrical abuses are generally found to occur during handling or deployment, Mechanical and Thermal stresses can be induced during transportation and storage. Therefore, it would be prudent to include predicted environmental exposure as part of the test plan. In the selection of a test program. specific test requirements should be tailored to meet the predicted mission requirements.

  11. Reduced Pressure Cabin Testing of the Orion Atmosphere Revitalization Technology

    NASA Technical Reports Server (NTRS)

    Button, Amy B.; Sweterlitsch, Jeffrey J.

    2013-01-01

    An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by United Technologies Corp. Aerospace Systems (UTAS, formerly Hamilton Sundstrand) and baselined for the Atmosphere Revitalization System for moderate duration missions of the Orion Multipurpose Crew Vehicle (MPCV). In previous years at this conference, reports were presented on extensive Johnson Space Center testing of this technology in a sea-level pressure environment with simulated and actual human metabolic loads in both open and closed-loop configurations. In 2011, the technology was tested in an open cabin-loop configuration at ambient and two sub-ambient pressures to compare the performance of the system to the results of previous tests at ambient pressure. The testing used a human metabolic simulator with a different type of water vapor generation than previously used, which added some unique challenges in the data analysis. This paper summarizes the results of: baseline and some matrix testing at all three cabin pressures, increased vacuum regeneration line pressure testing with a high metabolic load, a set of tests studying CO2 and water vapor co-adsorption effects relative to model-predicted performance, and validation tests of flight project computer model predictions with specific operating conditions.

  12. Safety analysis in test facility design

    NASA Astrophysics Data System (ADS)

    Valk, A.; Jonker, R. J.

    1990-09-01

    The application of safety analysis techniques as developed in, for example nuclear and petrochemical industry, can be very beneficial in coping with the increasing complexity of modern test facility installations and their operations. To illustrate the various techniques available and their phasing in a project, an overview of the most commonly used techniques is presented. Two case studies are described: the hazard and operability study techniques and safety zoning in relation to the possible presence of asphyxiating atmospheres.

  13. Blood pressure safety of subanesthetic ketamine for depression: A report on 684 infusions.

    PubMed

    Riva-Posse, Patricio; Reiff, Collin M; Edwards, Johnathan A; Job, Gregory P; Galendez, Gail C; Garlow, Steven J; Saah, Tammy C; Dunlop, Boadie W; McDonald, William M

    2018-08-15

    The dissociative anesthetic agent ketamine is increasingly being utilized to treat depression, despite not having FDA (Food and Drug Administration) approval for this indication. There are many questions about the potential risks of this treatment and hence the proper setting and degree of monitoring required to ensure patient safety. There is limited data about the cardiovascular safety of ketamine when administered at subanesthetic doses to treat depression. 66 patients in the Department of Psychiatry at Emory University received a total of 684 ketamine infusions between 2014 and 2016. Ketamine was dosed at 0.5 mg/kg body weight and infused over 40 min. Blood pressure was measured every 10 min during the infusions and every 15 min thereafter. Mean age of the patients was 56.7 years, 87.9% had unipolar depression and 36.1% had essential hypertension. No infusions were discontinued due to instability of vital signs, adverse physiological consequences or acute psychotomimetic effects. The biggest increases in blood pressure were measured at 30 min (systolic 3.28 mmHg, diastolic 3.17 mmHg). Hypertensive patients had higher blood pressure peaks during the infusions. Blood pressures returned to baseline during post-infusion monitoring. There was no development of tolerance to the blood pressure elevating effects of ketamine between the first and sixth infusions. This is a single site, retrospective analysis, of patients who were spontaneously seeking clinical care. The blood pressure changes observed when ketamine is administered over 40 min at 0.5 mg/kg for the treatment of depression are small, well tolerated and clinically insignificant. Copyright © 2018 Elsevier B.V. All rights reserved.

  14. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  15. Chemical Safety Alert: Rupture Hazard of Pressure Vessels

    EPA Pesticide Factsheets

    Pressure vessels or boilers can fail catastrophically if they are not properly designed, constructed, operated, inspected, tested, or repaired. Risk increases if vessels contents are toxic, corrosive, reactive, or flammable.

  16. Advanced Concepts for Pressure-Channel Reactors: Modularity, Performance and Safety

    NASA Astrophysics Data System (ADS)

    Duffey, Romney B.; Pioro, Igor L.; Kuran, Sermet

    Based on an analysis of the development of advanced concepts for pressure-tube reactor technology, we adapt and adopt the pressure-tube reactor advantage of modularity, so that the subdivided core has the potential for optimization of the core, safety, fuel cycle and thermal performance independently, while retaining passive safety features. In addition, by adopting supercritical water-cooling, the logical developments from existing supercritical turbine technology and “steam” systems can be utilized. Supercritical and ultra-supercritical boilers and turbines have been operating for some time in coal-fired power plants. Using coolant outlet temperatures of about 625°C achieves operating plant thermal efficiencies in the order of 45-48%, using a direct turbine cycle. In addition, by using reheat channels, the plant has the potential to produce low-cost process heat, in amounts that are customer and market dependent. The use of reheat systems further increases the overall thermal efficiency to 55% and beyond. With the flexibility of a range of plant sizes suitable for both small (400 MWe) and large (1400 MWe) electric grids, and the ability for co-generation of electric power, process heat, and hydrogen, the concept is competitive. The choice of core power, reheat channel number and exit temperature are all set by customer and materials requirements. The pressure channel is a key technology that is needed to make use of supercritical water (SCW) in CANDU®1 reactors feasible. By optimizing the fuel bundle and fuel channel, convection and conduction assure heat removal using passive-moderator cooling. Potential for severe core damage can be almost eliminated, even without the necessity of activating the emergency-cooling systems. The small size of containment structure lends itself to a small footprint, impacts economics and building techniques. Design features related to Canadian concepts are discussed in this paper. The main conclusion is that development of

  17. Measurement, testing, and safety technology: A compilation

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Methods and techniques in the related areas of measurement, testing, and safety are presented. Measuring techniques and devices and testing methods and devices are described. Articles on equipment modifications or procedures are included. Patent information is presented.

  18. 49 CFR 178.255-12 - Pressure test.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Specifications for Portable Tanks § 178.255-12 Pressure test. (a) Each completed portable tank prior to application of lining shall be tested before being put into transportation service by completely filling the...

  19. Subsurface fluid pressures from drill-stem tests, Uinta Basin, Utah

    USGS Publications Warehouse

    Nelson, P.H.

    2002-01-01

    High fluid pressures are known to be associated with oil and gas fields in the Uinta Basin, Utah. Shut-in pressure measurements from drill-stem tests show how pressure varies with depth and by area within the basin. The data base used in this report incorporates over 2,000 pressure measurements from drill-stem tests in wells completed prior to 1985. However, the number of useful pressure measurements is considerably less, because many drill-stem tests fail to stabilize at the actual formation pressure if the permeability is low. By extracting the maximum pressure measurements recorded in a collection of wells within an area, the trend of formation pressure within that area can be approximated. Areal compilations of pressures from drill-stem tests show that overpressured rock formations occur throughout much of the northern and eastern areas of the Uinta Basin. In particular, significant overpressuring (0.5 < pressure gradient < 0.8 psi/ft) is found throughout much of the Altamont-Bluebell field at depths ranging from 10,000 to 13,000 ft, equivalent to 5,000 to 8,000 ft below sea level. Limited data indicate that the pressure gradient declines at depths greater than 13,000 ft. An underpressured zone appears to exist in the Altamont-Bluebell field at depths shallower than 5,000 ft. Throughout the eastern Uinta Basin, moderately overpressured zones (0.46 < pressure gradient < 0.5 psi/ft) are common, with local evidence of significantly overpressured zones, but pressure gradients greater than 0.6 psi/ft are rare.

  20. SOL Tests Create Unfair Pressure.

    ERIC Educational Resources Information Center

    Ernst, Katie

    2000-01-01

    A seventh-grader explains why the Virginia Standards of Learning tests unfairly pressure her and her teachers. She wants her free reading time restored and wishes politicians would worry more about students understanding--not just memorizing--facts. She praises teachers who go beyond the SOL. (MLH)

  1. Blood pressure and neuropsychological test performance in healthy postmenopausal women.

    PubMed

    Alsumali, Adnan; Mekary, Rania A; Seeger, John; Regestein, Quentin

    2016-06-01

    To study the association between blood pressure and neuropsychological test performance in healthy postmenopausal women. Data from 88 healthy postmenopausal women aged 46-73 years, who were not experiencing hot flashes, and who had participated in a prior drug trial, were analyzed to find whether baseline blood pressure was associated with impaired performance on neuropsychological testing done at 3 follow-up visits separated by 4 weeks. Factor analysis was used to reduce the dimensions of neuropsychological test performance. Mixed linear modeling was used to evaluate the association between baseline blood pressure and repeatedly measured neuropsychological test performance at follow-up in a complete case analysis (n=53). In a sensitivity analysis (n=88), multiple-imputation using the Markov Chain Monte Carlo method was used to account for missing data (blood pressure results) for some visits. The variables recording neuropsychological test performance were reduced to two main factors (Factor 1=selective attention; Factor 2=complex processing). In the complete case analysis, the association between a 20-mmHg increase in diastolic blood pressure and Factor 1 remained statistically significant after adjusting for potential confounders, before adjusting for systolic blood pressure (slope=0.60; 95%CI=0.04,1.16), and after adjusting for systolic blood pressure (slope=0.76; 95%CI=0.06, 1.47). The positive slopes indicated an increase in the time spent performing a given task (i.e., a decrease in neuropsychological test performance). No other significant associations were found between systolic blood pressure and either factor. The results did not materially change after applying the multiple-imputation method. An increase in diastolic blood pressure was associated with a decrease in neuropsychological test performance among older healthy postmenopausal women experiencing hot flashes. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  2. Pressure and temperature fields associated with aero-optics tests. [transonic wind tunnel tests

    NASA Technical Reports Server (NTRS)

    Raman, K. R.

    1980-01-01

    The experimental investigation carried out in a 6 x 6 ft wind tunnel on four model configurations in the aero-optics series of tests are described. The data obtained on the random pressures (static and total pressures) and total temperatures are presented. In addition, the data for static pressure fluctuations on the Coelostat turret model are presented. The measurements indicate that the random pressures and temperature are negligible compared to their own mean (or steady state) values for the four models considered, thus allowing considerable simplification in the calculations to obtain the statistical properties of the density field. In the case of the Coelostat model tests these simplifications cannot be assumed a priori and require further investigation.

  3. Improvements in safety testing of lithium cells

    NASA Astrophysics Data System (ADS)

    Stinebring, R. C.; Krehl, P.

    1985-07-01

    A systematic approach was developed for evaluating the basic safety parameters of high power lithium soluble cathode cells. This approach consists of performing a series of tests on each cell model during the design, prototype and production phases. Abusive testing is performed in a facility where maximum protection is given to test personnel.

  4. Improvements in safety testing of lithium cells

    NASA Technical Reports Server (NTRS)

    Stinebring, R. C.; Krehl, P.

    1985-01-01

    A systematic approach was developed for evaluating the basic safety parameters of high power lithium soluble cathode cells. This approach consists of performing a series of tests on each cell model during the design, prototype and production phases. Abusive testing is performed in a facility where maximum protection is given to test personnel.

  5. Refuge alternatives relief valve testing and design with updated test stand.

    PubMed

    Lutz, T J; Bissert, P T; Homce, G T; Yonkey, J A

    2018-03-01

    Underground refuge alternatives require an air source to supply breathable air to the occupants. This requires pressure relief valves to prevent unsafe pressures from building up within the refuge alternative. The U.S. Mine Safety and Health Administration (MSHA) mandates that pressure relief valves prevent pressure from exceeding 1.25 kPa (0.18 psi), or as specified by the manufacturer, above mine atmospheric pressure when a fan or compressor is used for the air supply. The U.S. National Institute for Occupational Safety and Health (NIOSH) tested a variety of pressure relief valves using an instrumented test fixture consisting of data acquisition equipment, a centrifugal blower, ductwork and various sensors to determine if the subject pressure relief valves meet the MSHA requirement. Relief pressures and flow characteristics, including opening pressure and flow rate, were measured for five different pressure relief valves under a variety of conditions. The subject pressure relief valves included two off-the-shelf modified check valves, two check valves used in MSHA-approved built-in-place refuge alternatives, and a commercially available valve that was designed for a steel refuge alternative and is currently being used in some built-in-place refuge alternatives. The test results showed relief pressures ranging from 0.20 to 1.53 kPa (0.03 to 0.22 psi) and flow rates up to 19.3 m 3 /min (683 scfm). As tested, some of the pressure relief valves did not meet the 1.25 kPa (0.18 psi) relief specification.

  6. Refuge alternatives relief valve testing and design with updated test stand

    PubMed Central

    Lutz, T.J.; Bissert, P.T.; Homce, G.T.; Yonkey, J.A.

    2018-01-01

    Underground refuge alternatives require an air source to supply breathable air to the occupants. This requires pressure relief valves to prevent unsafe pressures from building up within the refuge alternative. The U.S. Mine Safety and Health Administration (MSHA) mandates that pressure relief valves prevent pressure from exceeding 1.25 kPa (0.18 psi), or as specified by the manufacturer, above mine atmospheric pressure when a fan or compressor is used for the air supply. The U.S. National Institute for Occupational Safety and Health (NIOSH) tested a variety of pressure relief valves using an instrumented test fixture consisting of data acquisition equipment, a centrifugal blower, ductwork and various sensors to determine if the subject pressure relief valves meet the MSHA requirement. Relief pressures and flow characteristics, including opening pressure and flow rate, were measured for five different pressure relief valves under a variety of conditions. The subject pressure relief valves included two off-the-shelf modified check valves, two check valves used in MSHA-approved built-in-place refuge alternatives, and a commercially available valve that was designed for a steel refuge alternative and is currently being used in some built-in-place refuge alternatives. The test results showed relief pressures ranging from 0.20 to 1.53 kPa (0.03 to 0.22 psi) and flow rates up to 19.3 m3/min (683 scfm). As tested, some of the pressure relief valves did not meet the 1.25 kPa (0.18 psi) relief specification. PMID:29563650

  7. Application of the Life Safety Code to a Historic Test Stand

    NASA Technical Reports Server (NTRS)

    Askins, Bruce; Lemke, Paul R.; Lewis, William L.; Covell, Carol C.

    2011-01-01

    NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact

  8. One Reading Specialist's Response to High-Stakes Testing Pressures

    ERIC Educational Resources Information Center

    Assaf, Lori

    2006-01-01

    Pressures to help students pass high-stakes tests affect teachers' reading instruction, their responsiveness to students' learning needs, and their professional effectiveness. This article reports on how one reading specialist responded to testing pressures in her urban elementary school. She believed that what was "right" for her…

  9. 33 CFR 159.111 - Pressure and vacuum pulse test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Pressure and vacuum pulse test. 159.111 Section 159.111 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Design, Construction, and Testing § 159.111 Pressure and...

  10. Posttest analysis of the FFTF inherent safety tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Padilla, A. Jr.; Claybrook, S.W.

    Inherent safety tests were performed during 1986 in the 400-MW (thermal) Fast Flux Test Facility (FFTF) reactor to demonstrate the effectiveness of an inherent shutdown device called the gas expansion module (GEM). The GEM device provided a strong negative reactivity feedback during loss-of-flow conditions by increasing the neutron leakage as a result of an expanding gas bubble. The best-estimate pretest calculations for these tests were performed using the IANUS plant analysis code (Westinghouse Electric Corporation proprietary code) and the MELT/SIEX3 core analysis code. These two codes were also used to perform the required operational safety analyses for the FFTF reactormore » and plant. Although it was intended to also use the SASSYS systems (core and plant) analysis code, the calibration of the SASSYS code for FFTF core and plant analysis was not completed in time to perform pretest analyses. The purpose of this paper is to present the results of the posttest analysis of the 1986 FFTF inherent safety tests using the SASSYS code.« less

  11. 49 CFR 179.500-16 - Tests of pressure relief devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Tests of pressure relief devices. 179.500-16... FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.500-16 Tests of pressure relief devices. (a) Pressure relief valves shall be...

  12. 77 FR 60479 - Burnup Credit in the Criticality Safety Analyses of Pressurized Water Reactor Spent Fuel in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Pressurized Water Reactor Spent Fuel in Transportation and Storage Casks AGENCY: Nuclear Regulatory Commission... 3, entitled, ``Burnup Credit in the Criticality Safety Analyses of PWR [Pressurized Water Reactor... water reactor spent nuclear fuel (SNF) in transportation packages and storage casks. SFST-ISG-8...

  13. Formal testing and utilization of streaming media to improve flight crew safety knowledge.

    PubMed

    Bellazzini, Marc A; Rankin, Peter M; Quisling, Jason; Gangnon, Ronald; Kohrs, Mike

    2008-01-01

    Increased concerns over the safety of air medical transport have prompted development of novel ways to increase safety. The objective of our study was to determine if an Internet streaming media safety video increased crew safety knowledge. 23 out of 40 crew members took an online safety pre-test, watched a safety video specific to our program and completed immediate and long-term post-testing 6 months later. Mean pre-test, post-test and 6 month follow up test scores were 84.9%, 92.3% and 88.4% respectively. There was a statistically significant difference in all scores (p safety training in our study.

  14. Force and pressure tests of the GA(W)-1 airfoil with a 20% aileron and pressure tests with a 30% Fowler flap

    NASA Technical Reports Server (NTRS)

    Wentz, W. H., Jr.; Seetharam, H. C.; Fiscko, K. A.

    1977-01-01

    Wind tunnel force and pressure tests were conducted for the GA(W)-1 airfoil equipped with a 20% aileron, and pressure tests were conducted with a 30% Fowler flap. All tests were conducted at a Reynolds number of 2.2 and a Mach number of 0.13. The aileron provides control effectiveness similar to ailerons applied to more conventional airfoils. Effects of aileron gaps from 0% to 2% chord were evaluated, as well as hinge moment characteristics. The aft camber of the GA(W)-1 section results in a substantial up-aileron moment, but the hinge moments associated with aileron deflection are similar to other configurations. Fowler flap pressure distributions indicate that unseparated flow is achieved for flap settings up to 40 deg., over a limited angle of attack range. Theoretical pressure distributions compare favorably with experiments for low flap deflections, but show substantial errors at large deflections.

  15. Composite Overwrapped Pressure Vessels (COPV) Stress Rupture Test

    NASA Technical Reports Server (NTRS)

    Russell, Richard; Flynn, Howard; Forth, Scott; Greene, Nathanael; Kezian, Michael; Varanauski, Don; Yoder, Tommy; Woodworth, Warren

    2009-01-01

    One of the major concerns for the aging Space Shuttle fleet is the stress rupture life of composite overwrapped pressure vessels (COPVs). Stress rupture life of a COPV has been defined as the minimum time during which the composite maintains structural integrity considering the combined effects of stress levels and time. To assist in the evaluation of the aging COPVs in the Orbiter fleet an analytical reliability model was developed. The actual data used to construct this model was from testing of COPVs constructed of similar, but not exactly same materials and pressure cycles as used on Orbiter vessels. Since no actual Orbiter COPV stress rupture data exists the Space Shuttle Program decided to run a stress rupture test to compare to model predictions. Due to availability of spares, the testing was unfortunately limited to one 40" vessel. The stress rupture test was performed at maximum operating pressure at an elevated temperature to accelerate aging. The test was performed in two phases. The first phase, 130 F, a moderately accelerated test designed to achieve the midpoint of the model predicted point reliability. The more aggressive second phase, performed at 160 F was designed to determine if the test article will exceed the 95% confidence interval of the model. This paper will discuss the results of this test, it's implications and possible follow-on testing.

  16. Advantages of the experimental animal hollow organ mechanical testing system for the rat colon rupture pressure test.

    PubMed

    Ji, Chengdong; Guo, Xuan; Li, Zhen; Qian, Shuwen; Zheng, Feng; Qin, Haiqing

    2013-01-01

    Many studies have been conducted on colorectal anastomotic leakage to reduce the incidence of anastomotic leakage. However, how to precisely determine if the bowel can withstand the pressure of a colorectal anastomosis experiment, which is called anastomotic bursting pressure, has not been determined. A task force developed the experimental animal hollow organ mechanical testing system to provide precise measurement of the maximum pressure that an anastomotic colon can withstand, and to compare it with the commonly used method such as the mercury and air bag pressure manometer in a rat colon rupture pressure test. Forty-five male Sprague-Dawley rats were randomly divided into the manual ball manometry (H) group, the tracing machine manometry pressure gauge head (MP) group, and the experimental animal hollow organ mechanical testing system (ME) group. The rats in each group were subjected to a cut colon rupture pressure test after injecting anesthesia in the tail vein. Colonic end-to-end anastomosis was performed, and the rats were rested for 1 week before anastomotic bursting pressure was determined by one of the three methods. No differences were observed between the normal colon rupture pressure and colonic anastomotic bursting pressure, which were determined using the three manometry methods. However, several advantages, such as reduction in errors, were identified in the ME group. Different types of manometry methods can be applied to the normal rat colon, but the colonic anastomotic bursting pressure test using the experimental animal hollow organ mechanical testing system is superior to traditional methods. Copyright © 2013 Surgical Associates Ltd. Published by Elsevier Ltd. All rights reserved.

  17. Safety Performance of Airborne Separation: Preliminary Baseline Testing

    NASA Technical Reports Server (NTRS)

    Consiglio, Maria C.; Hoadley, Sherwood T.; Wing, David J.; Baxley, Brian T.

    2007-01-01

    The Safety Performance of Airborne Separation (SPAS) study is a suite of Monte Carlo simulation experiments designed to analyze and quantify safety behavior of airborne separation. This paper presents results of preliminary baseline testing. The preliminary baseline scenario is designed to be very challenging, consisting of randomized routes in generic high-density airspace in which all aircraft are constrained to the same flight level. Sustained traffic density is varied from approximately 3 to 15 aircraft per 10,000 square miles, approximating up to about 5 times today s traffic density in a typical sector. Research at high traffic densities and at multiple flight levels are planned within the next two years. Basic safety metrics for aircraft separation are collected and analyzed. During the progression of experiments, various errors, uncertainties, delays, and other variables potentially impacting system safety will be incrementally introduced to analyze the effect on safety of the individual factors as well as their interaction and collective effect. In this paper we report the results of the first experiment that addresses the preliminary baseline condition tested over a range of traffic densities. Early results at five times the typical traffic density in today s NAS indicate that, under the assumptions of this study, airborne separation can be safely performed. In addition, we report on initial observations from an exploration of four additional factors tested at a single traffic density: broadcast surveillance signal interference, extent of intent sharing, pilot delay, and wind prediction error.

  18. Safety Testing of Ammonium Nitrate Based Mixtures

    NASA Astrophysics Data System (ADS)

    Phillips, Jason; Lappo, Karmen; Phelan, James; Peterson, Nathan; Gilbert, Don

    2013-06-01

    Ammonium nitrate (AN)/ammonium nitrate based explosives have a lengthy documented history of use by adversaries in acts of terror. While historical research has been conducted on AN-based explosive mixtures, it has primarily focused on detonation performance while varying the oxygen balance between the oxidizer and fuel components. Similarly, historical safety data on these materials is often lacking in pertinent details such as specific fuel type, particle size parameters, oxidizer form, etc. A variety of AN-based fuel-oxidizer mixtures were tested for small-scale sensitivity in preparation for large-scale testing. Current efforts focus on maintaining a zero oxygen-balance (a stoichiometric ratio for active chemical participants) while varying factors such as charge geometry, oxidizer form, particle size, and inert diluent ratios. Small-scale safety testing was conducted on various mixtures and fuels. It was found that ESD sensitivity is significantly affected by particle size, while this is less so for impact and friction. Thermal testing is in progress to evaluate hazards that may be experienced during large-scale testing.

  19. Influence of different safety shoes on gait and plantar pressure: a standardized examination of workers in the automotive industry

    PubMed Central

    Ochsmann, Elke; Noll, Ulrike; Ellegast, Rolf; Hermanns, Ingo; Kraus, Thomas

    2016-01-01

    Objective: Working conditions, such as walking and standing on hard surfaces, can increase the development of musculoskeletal complaints. At the interface between flooring and musculoskeletal system, safety shoes may play an important role in the well-being of employees. The aim of this study was to evaluate the effects of different safety shoes on gait and plantar pressure distributions on industrial flooring. Methods: Twenty automotive workers were individually fitted out with three different pairs of safety shoes ( "normal" shoes, cushioned shoes, and midfoot bearing shoes). They walked at a given speed of 1.5 m/s. The CUELA measuring system and shoe insoles were used for gait analysis and plantar pressure measurements, respectively. Statistical analysis was conducted by ANOVA analysis for repeated measures. Results: Walking with cushioned safety shoes or a midfoot bearing safety shoe led to a significant decrease of the average trunk inclination (p<0.005). Furthermore, the average hip flexion angle decreased for cushioned shoes as well as midfoot bearing shoes (p<0.002). The range of motion of the knee joint increased for cushioned shoes. As expected, plantar pressure distributions varied significantly between cushioned or midfoot bearing shoes and shoes without ergonomic components. Conclusion: The overall function of safety shoes is the avoidance of injury in case of an industrial accident, but in addition, safety shoes could be a long-term preventive instrument for maintaining health of the employees' musculoskeletal system, as they are able to affect gait parameters. Further research needs to focus on safety shoes in working situations. PMID:27488038

  20. Influence of different safety shoes on gait and plantar pressure: a standardized examination of workers in the automotive industry.

    PubMed

    Ochsmann, Elke; Noll, Ulrike; Ellegast, Rolf; Hermanns, Ingo; Kraus, Thomas

    2016-09-30

    Working conditions, such as walking and standing on hard surfaces, can increase the development of musculoskeletal complaints. At the interface between flooring and musculoskeletal system, safety shoes may play an important role in the well-being of employees. The aim of this study was to evaluate the effects of different safety shoes on gait and plantar pressure distributions on industrial flooring. Twenty automotive workers were individually fitted out with three different pairs of safety shoes ( "normal" shoes, cushioned shoes, and midfoot bearing shoes). They walked at a given speed of 1.5 m/s. The CUELA measuring system and shoe insoles were used for gait analysis and plantar pressure measurements, respectively. Statistical analysis was conducted by ANOVA analysis for repeated measures. Walking with cushioned safety shoes or a midfoot bearing safety shoe led to a significant decrease of the average trunk inclination (p<0.005). Furthermore, the average hip flexion angle decreased for cushioned shoes as well as midfoot bearing shoes (p<0.002). The range of motion of the knee joint increased for cushioned shoes. As expected, plantar pressure distributions varied significantly between cushioned or midfoot bearing shoes and shoes without ergonomic components. The overall function of safety shoes is the avoidance of injury in case of an industrial accident, but in addition, safety shoes could be a long-term preventive instrument for maintaining health of the employees' musculoskeletal system, as they are able to affect gait parameters. Further research needs to focus on safety shoes in working situations.

  1. Comparison between monitored and modeled pore water pressure and safety factor in a slope susceptible to shallow landslides

    NASA Astrophysics Data System (ADS)

    Bordoni, Massimiliano; Meisina, Claudia; Zizioli, Davide; Valentino, Roberto; Bittelli, Marco; Chersich, Silvia

    2014-05-01

    Shallow landslides can be defined as slope movements affecting superficial deposits of small thicknesses which are usually triggered due to extreme rainfall events, also very concentrated in time. Shallow landslides are hazardous phenomena: in particular, if they happen close to urbanized areas they could cause significant damages to cultivations, structures, infrastructures and, sometimes, human losses. The triggering mechanism of rainfall-induced shallow landslides is strictly linked with the hydrological and mechanical responses of usually unsaturated soils to rainfall events. For this reason, it is fundamental knowing the intrinsic hydro-mechanical properties of the soils in order to assess both susceptibility and hazard of shallow landslide and to develop early-warning systems at large scale. The hydrological data collected by a 20 months monitoring on a slope susceptible to shallow landslides in an area of the North -Eastern Oltrepo Pavese (Northern Apennines, Italy) were used to identify the hydrological behaviors of the investigated soils towards rainfall events. Field conditions under different rainfall trends have also been modeled by using both hydrological and physically-based stability models for the evaluation of the slope safety factor . The main objectives of this research are: (a) to compare the field measured pore water pressures at different depths with results of hydrological models, in order to evaluate the efficiency of the tested models and to determine how precipitations affect pore pressure development; (b) to compare the time trends of the safety factor that have been obtained by applying different stability models; (c) to evaluate, through a sensitivity analysis, the effects of soil hydrological properties on modeling pore water pressure and safety factor. The test site slope where field measurements were acquired is representative of other sites in Northern Apennines affected by shallow landslides and is characterized by medium

  2. 49 CFR 178.345-13 - Pressure and leakage tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... entire cargo tank surface is inspected for leakage and other sign of defects. The inspection method must... Specifications for Containers for Motor Vehicle Transportation § 178.345-13 Pressure and leakage tests. (a) Each cargo tank must be pressure and leakage tested in accordance with this section and §§ 178.346-5, 178.347...

  3. 49 CFR 178.345-13 - Pressure and leakage tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... entire cargo tank surface is inspected for leakage and other sign of defects. The inspection method must... Specifications for Containers for Motor Vehicle Transportation § 178.345-13 Pressure and leakage tests. (a) Each cargo tank must be pressure and leakage tested in accordance with this section and §§ 178.346-5, 178.347...

  4. 49 CFR 178.345-13 - Pressure and leakage tests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... entire cargo tank surface is inspected for leakage and other sign of defects. The inspection method must... Specifications for Containers for Motor Vehicle Transportation § 178.345-13 Pressure and leakage tests. (a) Each cargo tank must be pressure and leakage tested in accordance with this section and §§ 178.346-5, 178.347...

  5. 49 CFR 178.345-13 - Pressure and leakage tests.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... entire cargo tank surface is inspected for leakage and other sign of defects. The inspection method must... Specifications for Containers for Motor Vehicle Transportation § 178.345-13 Pressure and leakage tests. (a) Each cargo tank must be pressure and leakage tested in accordance with this section and §§ 178.346-5, 178.347...

  6. Joint Ordnance Test Procedure (JOTP)-010 Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions

    DTIC Science & Technology

    2016-05-09

    electromagnetic environment for which they are designed to be used. These tests are performed on a powered weapon during simulated normal operation and are...010B SAFETY AND SUITABILITY FOR SERVICE ASSESSMENT TESTING FOR SHOULDER LAUNCHED MUNITIONS Joint Services Munition Safety Test Working Group JOTP...12 6.8 Test Sample Quantities .......................................................... 13 7. PRE- AND POST - TEST INSPECTIONS

  7. Reserve Li/SOC12 Battery Safety Testing

    NASA Technical Reports Server (NTRS)

    Dils, C. T.; Garoutte, K. F.

    1984-01-01

    A reserve Lithium/Thionyl Chloride Battery concept is developed and undergoing feasibility testing in terms of performance, safety and abusive conditions. The feasibility of employing a battery of this type to replace thermal batteries in certain applications is demonstrated. Excellent performance of a Li/SOCl2 reserve battery is obtained across the temperature range from 0 C to +44 C. Performance improvement over the thermal battery usage is greater by a factor of 3 when discharge time and energy density are compared. Performance over an expanded temperature range is also possible. Safety and abusive testing is accomplished successfully on a series of five units. Further performance improvements can be achieved with regard to battery weight and volume reductions.

  8. Eddy current testing of composite pressure vessels

    NASA Astrophysics Data System (ADS)

    Casperson, R.; Pohl, R.; Munzke, D.; Becker, B.; Pelkner, M.

    2018-04-01

    The use of composite pressure vessels instead of conventional vessels made of steel or aluminum grew strongly over the last decade. The reason for this trend is the tremendous weight saving in the case of composite vessels. However, the long-time behavior is not fully understood for filling and discharging cycles and creep strength and their influence on the CFRP coating (carbon fiber reinforced plastics) and the internal liner (steel, aluminum, or plastics). The CFRP ensures the pressure resistance while the inner liner is used as a container for liquid or gas. To overcome the missing knowledge of aging, BAM started an internal project to investigate degradation of these material systems. Therefore, applicable testing methods like eddy current testing are needed. Normally, high-frequency eddy current testing (HF-ET, f > 10 MHz) is deployed for CFRP due to its low conductivity of the fiber, which is in the order of 0.01 MS/s, and the capacitive coupling between the fibers. Nevertheless, in some cases conventional ET can be applied. We show a concise summary of studies on the application of conventional ET of composite pressure vessels.

  9. 49 CFR 195.308 - Testing of tie-ins.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.308 Testing of tie-ins. Pipe associated with tie-ins must be pressure...

  10. 49 CFR 195.308 - Testing of tie-ins.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.308 Testing of tie-ins. Pipe associated with tie-ins must be pressure...

  11. 49 CFR 195.308 - Testing of tie-ins.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.308 Testing of tie-ins. Pipe associated with tie-ins must be pressure...

  12. 49 CFR 195.308 - Testing of tie-ins.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.308 Testing of tie-ins. Pipe associated with tie-ins must be pressure...

  13. 49 CFR 195.308 - Testing of tie-ins.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE Pressure Testing § 195.308 Testing of tie-ins. Pipe associated with tie-ins must be pressure...

  14. Neurovirulence safety testing of mumps vaccines--historical perspective and current status.

    PubMed

    Rubin, S A; Afzal, M A

    2011-04-05

    Many live, attenuated viral vaccines are derived from wild type viruses with known neurovirulent properties. To assure the absence of residual neurotoxicity, pre-clinical neurovirulence safety testing of candidate vaccines is performed. For mumps virus, a highly neurotropic virus, neurovirulence safety testing is performed in monkeys. However, laboratory studies suggest an inability of this test to correctly discern among virus strains of varying neurovirulence potential in man, and, further, some vaccines found to be neuroattenuated in monkeys were later found to be neurovirulent in humans when administered in large numbers. Over the past decade, concerted efforts have been made to replace monkey-based neurovirulence safety testing with more informative, alternative methods. This review summarizes the current status of mumps vaccine neurovirulence safety testing and insights into models currently approved and those under development. Published by Elsevier Ltd.

  15. High-Throughput Toxicity Testing: New Strategies for Assessing Chemical Safety

    EPA Science Inventory

    In recent years, the food industry has made progress in improving safety testing methods focused on microbial contaminants in order to promote food safety. However, food industry toxicologists must also assess the safety of food-relevant chemicals including pesticides, direct add...

  16. Autonomous Flight Safety System September 27, 2005, Aircraft Test

    NASA Technical Reports Server (NTRS)

    Simpson, James C.

    2005-01-01

    This report describes the first aircraft test of the Autonomous Flight Safety System (AFSS). The test was conducted on September 27, 2005, near Kennedy Space Center (KSC) using a privately-owned single-engine plane and evaluated the performance of several basic flight safety rules using real-time data onboard a moving aerial vehicle. This test follows the first road test of AFSS conducted in February 2005 at KSC. AFSS is a joint KSC and Wallops Flight Facility (WEF) project that is in its third phase of development. AFSS is an independent subsystem intended for use with Expendable Launch Vehicles that uses tracking data from redundant onboard sensors to autonomously make flight termination decisions using software-based rules implemented on redundant flight processors. The goals of this project are to increase capabilities by allowing launches from locations that do not have or cannot afford extensive ground-based range safety assets, to decrease range costs, and to decrease reaction time for special situations. The mission rules are configured for each operation by the responsible Range Safety authorities and can be loosely categorized in four major categories: Parameter Threshold Violations, Physical Boundary Violations present position and instantaneous impact point (TIP), Gate Rules static and dynamic, and a Green-Time Rule. Examples of each of these rules were evaluated during this aircraft test.

  17. A pressure-packer system for conducting rising head tests in water table wells

    USGS Publications Warehouse

    Levy, Benjamin S.; Pannell, Lawrence J.; Dadoly, John P.

    1993-01-01

    The pressure system developed for fully-saturated well screens has been modified for conducting rising head tests in water table wells installed in highly permeable aquifers. The pressure system consists of a compressed air source and 1 inch diameter PVC piping with a packer attached at the end. The pressure system was evaluated in a series of rising head tests conducted in a well at a Superfund site in New England. The well was tested with slugs and with the pressure system. Within each technique, estimates of hydraulic conductivity showed no difference. Comparison of hydraulic conductivity estimates between techniques (slug test vs. pressure test) showed differences due to stratigraphy. The interval tested using slug tests crossed two stratigraphic units; the pressure system tested only one of these units. We conclude that the pressure system may be used to characterize the vertical hydraulic conductivity distribution in a series of successive tests by changing the packer position and the screened interval tested.

  18. The influence of intraocular pressure and air jet pressure on corneal contactless tonometry tests.

    PubMed

    Simonini, Irene; Pandolfi, Anna

    2016-05-01

    The air puff is a dynamic contactless tonometer test used in ophthalmology clinical practice to assess the biomechanical properties of the human cornea and the intraocular pressure due to the filling fluids of the eye. The test is controversial, since the dynamic response of the cornea is governed by the interaction of several factors which cannot be discerned within a single measurement. In this study we describe a numerical model of the air puff tests, and perform a parametric analysis on the major action parameters (jet pressure and intraocular pressure) to assess their relevance on the mechanical response of a patient-specific cornea. The particular cornea considered here has been treated with laser reprofiling to correct myopia, and the parametric study has been conducted on both the preoperative and postoperative geometries. The material properties of the cornea have been obtained by means of an identification procedure that compares the static biomechanical response of preoperative and postoperative corneas under the physiological IOP. The parametric study on the intraocular pressure suggests that the displacement of the cornea׳s apex can be a reliable indicator for tonometry, and the one on the air jet pressure predicts the outcomes of two or more distinct measurements on the same cornea, which can be used in inverse procedures to estimate the material properties of the tissue. Copyright © 2015 Elsevier Ltd. All rights reserved.

  19. Wind-Tunnel Tests of Seven Static-Pressure Probes at Transonic Speeds

    NASA Technical Reports Server (NTRS)

    Capone, Francis J.

    1961-01-01

    Wind-tunnel tests have been conducted to determine the errors of 3 seven static-pressure probes mounted very close to the nose of a body of revolution simulating a missile forebody. The tests were conducted at Mach numbers from 0.80 to 1.08 and at angles of attack from -1.7 deg to 8.4 deg. The test Reynolds number per foot varied from 3.35 x 10(exp 6) to 4.05 x 10(exp 6). For three 4-vane, gimbaled probes, the static-pressure errors remained constant throughout the test angle-of-attack range for all Mach numbers except 1.02. For two single-vane, self-rotating probes having two orifices at +/-37.5 deg. from the plane of symmetry on the lower surface of the probe body, the static-pressure error varied as much as 1.5 percent of free-stream static pressure through the test angle-of- attack range for all Mach numbers. For two fixed, cone-cylinder probes of short length and large diameter, the static-pressure error varied over the test angle-of-attack range at constant Mach numbers as much as 8 to 10 percent of free-stream static pressure.

  20. Evaluation of Acoustic Emission SHM of PRSEUS Composite Pressure Cube Tests

    NASA Technical Reports Server (NTRS)

    Horne, Michael R.; Madaras, Eric I.

    2013-01-01

    A series of tests of the Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) pressure cube were conducted during third quarter 2011 at NASA Langley Research Center (LaRC) in the Combined Loads Test facility (COLTS). This is a report of the analysis of the Acoustic Emission (AE) data collected during those tests. The AE signals of the later tests are consistent with the final failure progression through two of the pressure cube panels. Calibration tests and damage precursor AE indications, from preliminary checkout pressurizations, indicated areas of concern that eventually failed. Hence those tests have potential for vehicle health monitoring.

  1. 49 CFR 179.400-21 - Test of pressure relief valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Test of pressure relief valves. 179.400-21 Section... CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-21 Test of pressure relief valves. Each valve must be tested with air or gas for...

  2. 49 CFR 179.400-21 - Test of pressure relief valves.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Test of pressure relief valves. 179.400-21 Section... FOR TANK CARS Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A) § 179.400-21 Test of pressure relief valves. Each valve must be tested with air or gas...

  3. Laboratory testing of alcohol safety interlock systems employing divided attention tests

    DOT National Transportation Integrated Search

    1975-12-01

    Author's abstract: Prototype Alcohol Safety Interlock Systems employing measurements of tracking ability, reaction time, and response accuracy to discern alcohol impairment were submitted to laboratory testing. These systems were modified versions of...

  4. Preliminary development of an advanced modular pressure relief cushion: Testing and user evaluation.

    PubMed

    Freeto, Tyler; Mitchell, Steven J; Bogie, Kath M

    2018-02-01

    Effective pressure relief cushions are identified as a core assistive technology need by the World Health Organization Global Cooperation on Assistive Technology. High quality affordable wheelchair cushions could provide effective pressure relief for many individuals with limited access to advanced assistive technology. Value driven engineering (VdE) principles were employed to develop a prototype modular cushion. Low cost dynamically responsive gel balls were arranged in a close packed array and seated in bilayer foam for containment and support. Two modular cushions, one with high compliance balls and one with moderate compliance balls were compared with High Profile and Low Profile Roho ® and Jay ® Medical 2 cushions. ISO 16480-2 biomechanical standardized tests were applied to assess cushion performance. A preliminary materials cost analysis was carried out. A prototype modular cushion was evaluated by 12 participants who reported satisfaction using a questionnaire based on the Quebec User Evaluation of Satisfaction with Assistive Technology (QUEST 2.0) instrument. Overall the modular cushions performed better than, or on par with, the most widely prescribed commercially available cushions under ISO 16480-2 testing. Users rated the modular cushion highly for overall appearance, size and dimensions, comfort, safety, stability, ease of adjustment and general ease of use. Cost-analysis indicated that every modular cushion component a could be replaced several times and still maintain cost-efficacy over the complete cushion lifecycle. A VdE modular cushion has the potential provide effective pressure relief for many users at a low lifetime cost. Copyright © 2017. Published by Elsevier Ltd.

  5. 30 CFR 18.98 - Enclosures, joints, and fastenings; pressure testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... consistent with unyielding components during a pressure-time history as derived from a series of oscillograms...; pressure testing. (a) Cast or welded enclosures shall be designed to withstand a minimum internal pressure...

  6. 30 CFR 18.98 - Enclosures, joints, and fastenings; pressure testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consistent with unyielding components during a pressure-time history as derived from a series of oscillograms...; pressure testing. (a) Cast or welded enclosures shall be designed to withstand a minimum internal pressure...

  7. 30 CFR 18.98 - Enclosures, joints, and fastenings; pressure testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... consistent with unyielding components during a pressure-time history as derived from a series of oscillograms...; pressure testing. (a) Cast or welded enclosures shall be designed to withstand a minimum internal pressure...

  8. 30 CFR 18.98 - Enclosures, joints, and fastenings; pressure testing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... consistent with unyielding components during a pressure-time history as derived from a series of oscillograms...; pressure testing. (a) Cast or welded enclosures shall be designed to withstand a minimum internal pressure...

  9. 30 CFR 18.98 - Enclosures, joints, and fastenings; pressure testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... consistent with unyielding components during a pressure-time history as derived from a series of oscillograms...; pressure testing. (a) Cast or welded enclosures shall be designed to withstand a minimum internal pressure...

  10. Autonomous Flight Safety System Road Test

    NASA Technical Reports Server (NTRS)

    Simpson, James C.; Zoemer, Roger D.; Forney, Chris S.

    2005-01-01

    On February 3, 2005, Kennedy Space Center (KSC) conducted the first Autonomous Flight Safety System (AFSS) test on a moving vehicle -- a van driven around the KSC industrial area. A subset of the Phase III design was used consisting of a single computer, GPS receiver, and UPS antenna. The description and results of this road test are described in this report.AFSS is a joint KSC and Wallops Flight Facility project that is in its third phase of development. AFSS is an independent subsystem intended for use with Expendable Launch Vehicles that uses tracking data from redundant onboard sensors to autonomously make flight termination decisions using software-based rules implemented on redundant flight processors. The goals of this project are to increase capabilities by allowing launches from locations that do not have or cannot afford extensive ground-based range safety assets, to decrease range costs, and to decrease reaction time for special situations.

  11. Wind pressure testing of tornado safe room components made from wood

    Treesearch

    Robert Falk; Deepak Shrestha

    2016-01-01

    To evaluate the ability of a wood tornado safe room to resist wind pressures produced by a tornado, two safe room com-ponents were tested for wind pressure strength. A tornado safe room ceiling panel and door were static-pressure-tested according to ASTM E 330 using a vacuum test system. Re-sults indicate that the panels had load capacities from 2.4 to 3.5 times that...

  12. Safety Assessment of TACOM’s Ride Motion Simulator

    DTIC Science & Technology

    1990-01-24

    level (1300 to 1800 psi). 24 Step 16. Pressurize the system by moving the main pressure switch to "ON." Wait for the roll, pitch, and yaw error signals...the appropriate seat/shoulder/safety belts and harnesses. Carefully, help the test subject dismount. Step 41. Flip the main pressure switch on the...Dismount the test subject. Step 6. Move the main pressure switch to the "OFF" position. This will block any hydraulic flow to the system. Step 7. Move the

  13. High Pressure Hydrogen Pressure Relief Devices: Accelerated Life Testing and Application Best Practices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgess, Robert M.; Post, Matthew B.; Buttner, William J.

    Pressure relief devices (PRDs ) are used to protect high pressure systems from burst failure caused by overpressurization. Codes and standards require the use of PRDs for the safe design of many pressurized systems. These systems require high reliability due to the risks associated with a burst failure. Hydrogen service can increase the risk of PRD failure due to material property degradation caused by hydrogen attack. The National Renewable Energy Laboratory (NREL) has conducted an accelerated life test on a conventional spring loaded PRD. Based on previous failures in the field, the nozzles specific to these PRDs are of particularmore » interest. A nozzle in a PRD is a small part that directs the flow of fluid toward the sealing surface to maintain the open state of the valve once the spring force is overcome. The nozzle in this specific PRD is subjected to the full tensile force of the fluid pressure. These nozzles are made from 440C material, which is a type of hardened steel that is commonly chosen for high pressure applications because of its high strength properties. In a hydrogen environment, however, 440C is considered a worst case material since hydrogen attack results in a loss of almost all ductility and thus 440C is prone to fatigue and material failure. Accordingly, 440C is not recommended for hydrogen service. Conducting an accelerated life test on a PRD with 440C material provides information on necessary and sufficient conditions required to produce crack initiation and failure. The accelerated life test also provides information on other PRD failure modes that are somewhat statistically random in nature.« less

  14. PRSEUS Pressure Cube Test Data and Response

    NASA Technical Reports Server (NTRS)

    Lovejoy, Andrew E.

    2013-01-01

    NASA s Environmentally Responsible Aviation (ERA) Program is examining the hybrid wing body (HWB) aircraft, among others, in an effort to increase the fuel efficiency of commercial aircraft. The HWB design combines features of a flying wing with features of conventional transport aircraft, and has the advantage of simultaneously increasing both fuel efficiency and payload. Recent years have seen an increased focus on the structural performance of the HWB. The key structural challenge of a HWB airframe is the ability to create a cost and weight efficient, non-circular, pressurized shell. Conventional round fuselage sections react cabin pressure by hoop tension. However, the structural configuration of the HWB subjects the majority of the structural panels to bi-axial, in-plane loads in addition to the internal cabin pressure, which requires more thorough examination and analysis than conventional transport aircraft components having traditional and less complex load paths. To address this issue, while keeping structural weights low, extensive use of advanced composite materials is made. This report presents the test data and preliminary conclusions for a pressurized cube test article that utilizes Boeing's Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS), and which is part of the building block approach used for HWB development.

  15. Three-Dimensional Digital Image Correlation of a Composite Overwrapped Pressure Vessel During Hydrostatic Pressure Tests

    NASA Technical Reports Server (NTRS)

    Revilock, Duane M., Jr.; Thesken, John C.; Schmidt, Timothy E.

    2007-01-01

    Ambient temperature hydrostatic pressurization tests were conducted on a composite overwrapped pressure vessel (COPV) to understand the fiber stresses in COPV components. Two three-dimensional digital image correlation systems with high speed cameras were used in the evaluation to provide full field displacement and strain data for each pressurization test. A few of the key findings will be discussed including how the principal strains provided better insight into system behavior than traditional gauges, a high localized strain that was measured where gages were not present and the challenges of measuring curved surfaces with the use of a 1.25 in. thick layered polycarbonate panel that protected the cameras.

  16. Non-Axisymmetric Inflatable Pressure Structure (NAIPS) Full-Scale Pressure Test

    NASA Technical Reports Server (NTRS)

    Jones, Thomas C.; Doggett, William R.; Warren, Jerry E.; Watson, Judith J.; Shariff, Khadijah; Makino, Alberto; Yount, Bryan C.

    2017-01-01

    Inflatable space structures have the potential to significantly reduce the required launch volume for large pressure vessels required for exploration applications including habitats, airlocks and tankage. In addition, mass savings can be achieved via the use of high specific strength softgoods materials, and the reduced design penalty from launching the structure in a densely packaged state. Large inclusions however, such as hatches, induce a high mass penalty at the interfaces with the softgoods and in the added rigid structure while reducing the packaging efficiency. A novel, Non-Axisymmetric Inflatable Pressure Structure (NAIPS) was designed and recently tested at NASA Langley Research Center to demonstrate an elongated inflatable architecture that could provide areas of low stress along a principal axis in the surface. These low stress zones will allow the integration of a flexible linear seal that substantially reduces the added mass and volume of a heritage rigid hatch structure. This paper describes the test of the first full-scale engineering demonstration unit (EDU) of the NAIPS geometry and a comparison of the results to finite element analysis.

  17. 76 FR 1504 - Pipeline Safety: Establishing Maximum Allowable Operating Pressure or Maximum Operating Pressure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... profile that is dependent upon the pipelines attributes, its geographical location, design, operating... type of threats posed by the pipeline segment, including consideration of the age, design, pipe... calculation. There are several methods available for establishing MAOP or MOP. A hydrostatic pressure test...

  18. Influence of pressure change during hydraulic tests on fracture aperture.

    PubMed

    Ji, Sung-Hoon; Koh, Yong-Kwon; Kuhlman, Kristopher L; Lee, Moo Yul; Choi, Jong Won

    2013-03-01

    In a series of field experiments, we evaluate the influence of a small water pressure change on fracture aperture during a hydraulic test. An experimental borehole is instrumented at the Korea Atomic Energy Research Institute (KAERI) Underground Research Tunnel (KURT). The target fracture for testing was found from the analyses of borehole logging and hydraulic tests. A double packer system was developed and installed in the test borehole to directly observe the aperture change due to water pressure change. Using this packer system, both aperture and flow rate are directly observed under various water pressures. Results indicate a slight change in fracture hydraulic head leads to an observable change in aperture. This suggests that aperture change should be considered when analyzing hydraulic test data from a sparsely fractured rock aquifer. © 2012, The Author(s). Groundwater © 2012, National Ground Water Association.

  19. Pressurized Testing of Solid Oxide Electrolysis Stacks with Advanced Electrode-Supported Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. E. O'Brien; X. Zhang; G. K. Housley

    2012-06-01

    A new facility has been developed at the Idaho National Laboratory for pressurized testing of solid oxide electrolysis stacks. Pressurized operation is envisioned for large-scale hydrogen production plants, yielding higher overall efficiencies when the hydrogen product is to be delivered at elevated pressure for tank storage or pipelines. Pressurized operation also supports higher mass flow rates of the process gases with smaller components. The test stand can accommodate cell dimensions up to 8.5 cm x 8.5 cm and stacks of up to 25 cells. The pressure boundary for these tests is a water-cooled spool-piece pressure vessel designed for operation upmore » to 5 MPa. The stack is internally manifolded and operates in cross-flow with an inverted-U flow pattern. Feed-throughs for gas inlets/outlets, power, and instrumentation are all located in the bottom flange. The entire spool piece, with the exception of the bottom flange, can be lifted to allow access to the internal furnace and test fixture. Lifting is accomplished with a motorized threaded drive mechanism attached to a rigid structural frame. Stack mechanical compression is accomplished using springs that are located inside of the pressure boundary, but outside of the hot zone. Initial stack heatup and performance characterization occurs at ambient pressure followed by lowering and sealing of the pressure vessel and subsequent pressurization. Pressure equalization between the anode and cathode sides of the cells and the stack surroundings is ensured by combining all of the process gases downstream of the stack. Steady pressure is maintained by means of a backpressure regulator and a digital pressure controller. A full description of the pressurized test apparatus is provided in this paper.« less

  20. Pressure Safety: Advanced Live 11459

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, George

    Many Los Alamos National Laboratory (LANL) operations use pressure equipment and systems. Failure to follow proper procedures when designing or operating pressure systems can result in injuries to personnel and damage to equipment and/or the environment. This manual presents an overview of the requirements and recommendations that address the safe design and operation of pressure systems at LANL.

  1. Safety and Suitability for Service Assessment Testing for Aircraft Launched Munitions

    DTIC Science & Technology

    2013-07-01

    2013 12 benefits in terms of cost and test efficiency that tend to associate the Analytical S3 Test Approach with complex missile systems and the... systems containing expensive, non-safety related components. c. When using the Analytical S3 Test Approach for aircraft launched bombs, full BTCA is...establish safety margin of the system . Details of the Empirical Test Flow with full and reduced BTCA options are provided in Appendix B, Annexes 3 and

  2. Space station pressurized laboratory safety guidelines

    NASA Technical Reports Server (NTRS)

    Mcgonigal, Les

    1990-01-01

    Before technical safety guidelines and requirements are established, a common understanding of their origin and importance must be shared between Space Station Program Management, the User Community, and the Safety organizations involved. Safety guidelines and requirements are driven by the nature of the experiments, and the degree of crew interaction. Hazard identification; development of technical safety requirements; operating procedures and constraints; provision of training and education; conduct of reviews and evaluations; and emergency preplanning are briefly discussed.

  3. 75 FR 76078 - Pipeline Safety: Random Drug Testing Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... PHMSA-2010-0323] Pipeline Safety: Random Drug Testing Rate AGENCY: Pipeline and Hazardous Materials... testing. SUMMARY: PHMSA has determined that the minimum random drug testing rate for covered employees... employees for random drug testing. Pursuant to 49 CFR 199.105(c)(2), (3), and (4), the PHMSA Administrator's...

  4. Dimensions of Safety Climate among Iranian Nurses.

    PubMed

    Konjin, Z Naghavi; Shokoohi, Y; Zarei, F; Rahimzadeh, M; Sarsangi, V

    2015-10-01

    Workplace safety has been a concern of workers and managers for decades. Measuring safety climate is crucial in improving safety performance. It is also a method of benchmarking safety perception. To develop and validate a psychometrics scale for measuring nurses' safety climate. Literature review, subject matter experts and nurse's judgment were used in items developing. Content validity and reliability for new tool were tested by content validity index (CVI) and test-retest analysis, respectively. Exploratory factor analysis (EFA) with varimax rotation was used to improve the interpretation of latent factors. A 40-item scale in 6 factors was developed, which could explain 55% of the observed variance. The 6 factors included employees' involvement in safety and management support, compliance with safety rules, safety training and accessibility to personal protective equipment, hindrance to safe work, safety communication and job pressure, and individual risk perception. The proposed scale can be used in identifying the needed areas to implement interventions in safety climate of nurses.

  5. The perceived compatibility of safety and production expectations in hazardous occupations.

    PubMed

    McLain, David L; Jarrell, Kimberly A

    2007-01-01

    Safety hazards are unavoidable in many work environments. Employees must be both productive and safe, however, conflicting safety and production demands can negatively affect safety, production, or both. The employee's perception of the compatibility of management's safety and production expectations is a possible predictor of such consequences. This paper defines "safety-production compatibility" and describes how measures of safety-production compatibility, as well as safety pressure and production pressure, were developed. We used LISREL structural equation modeling to test the influences of safety-production compatibility, safety pressure, and production pressure on safe work behavior and interference with performing other work tasks. The 239 study participants were workers employed in diverse but hazardous occupations. Pressure to work safely was positively associated with safe work behavior. The perceived compatibility of safety and production demands positively influenced safe work behavior and reduced the interference of safety hazards performing other tasks. Safety-production compatibility was also found to mediate the relationship between trust in management and safe work behavior. The results of this field study suggest increased compatibility, and thus less conflict, between safety and production demands influences safe work behavior and the interference of safety hazards with performing other work tasks. More broadly, the worker's reaction to multiple work demands is a safety and performance influence. Safety management efforts that focus only on the hazards fail to eliminate many accidents because accidents arise from many factors including technology, safety climate, social influences, production, and safety demands. This study suggests that workers differ in their perception of the compatibility of safety and production demands. These differences will show up in safe work behavior, influencing the effectiveness of safety management efforts and the

  6. Techniques for Embedding Instrumentation in Pressure Vessel Test Articles

    NASA Technical Reports Server (NTRS)

    Cornelius, Michael

    2006-01-01

    Many interesting structural and thermal events occur in materials that are housed within a surrounding pressure vessel. In order to measure the environment during these events and explore their causes instrumentation must be installed on or in the material. Transducers can be selected that are small enough to be embedded within the test material but these instruments must interface with an external system in order to apply excitation voltages and output the desired data. The methods for installing the instrumentation and creating an interface are complicated when the material is located in a case or housing containing high pressures and hot gases. Installation techniques for overcoming some of these difficulties were developed while testing a series of small-scale solid propellant and hybrid rocket motors at Marshall Space Flight Center. These techniques have potential applications in other test articles where data are acquired from materials that require containment due to the severe environment encountered during the test process. This severe environment could include high pressure, hot gases, or ionized atmospheres. The development of these techniques, problems encountered, and the lessons learned from the ongoing testing process are summarized.

  7. Low-pressure membrane integrity tests for drinking water treatment: A review.

    PubMed

    Guo, H; Wyart, Y; Perot, J; Nauleau, F; Moulin, P

    2010-01-01

    Low-pressure membrane systems, including microfiltration (MF) and ultrafiltration (UF) membranes, are being increasingly used in drinking water treatments due to their high level of pathogen removal. However, the pathogen will pass through the membrane and contaminate the product if the membrane integrity is compromised. Therefore, an effective on-line integrity monitoring method for MF and UF membrane systems is essential to guarantee the regulatory requirements for pathogen removal. A lot of works on low-pressure membrane integrity tests have been conducted by many researchers. This paper provides a literature review about different low-pressure membrane integrity monitoring methods for the drinking water treatment, including direct methods (pressure-based tests, acoustic sensor test, liquid porosimetry, etc.) and indirect methods (particle counting, particle monitoring, turbidity monitoring, surrogate challenge tests). Additionally, some information about the operation of membrane integrity tests is presented here. It can be realized from this review that it remains urgent to develop an alternative on-line detection technique for a quick, accurate, simple, continuous and relatively inexpensive evaluation of low-pressure membrane integrity. To better satisfy regulatory requirements for drinking water treatments, the characteristic of this ideal membrane integrity test is proposed at the end of this paper.

  8. Applications of High and Ultra High Pressure Homogenization for Food Safety.

    PubMed

    Patrignani, Francesca; Lanciotti, Rosalba

    2016-01-01

    Traditionally, the shelf-life and safety of foods have been achieved by thermal processing. Low temperature long time and high temperature short time treatments are the most commonly used hurdles for the pasteurization of fluid foods and raw materials. However, the thermal treatments can reduce the product quality and freshness. Consequently, some non-thermal pasteurization process have been proposed during the last decades, including high hydrostatic pressure, pulsed electric field, ultrasound (US), and high pressure homogenization (HPH). This last technique has been demonstrated to have a great potential to provide "fresh-like" products with prolonged shelf-life. Moreover, the recent developments in high-pressure-homogenization technology and the design of new homogenization valves able to withstand pressures up to 350-400 MPa have opened new opportunities to homogenization processing in the food industries and, consequently, permitted the development of new products differentiated from traditional ones by sensory and structural characteristics or functional properties. For this, this review deals with the principal mechanisms of action of HPH against microorganisms of food concern in relation to the adopted homogenizer and process parameters. In addition, the effects of homogenization on foodborne pathogenic species inactivation in relation to the food matrix and food chemico-physical and process variables will be reviewed. Also the combined use of this alternative technology with other non-thermal technologies will be considered.

  9. Applications of High and Ultra High Pressure Homogenization for Food Safety

    PubMed Central

    Patrignani, Francesca; Lanciotti, Rosalba

    2016-01-01

    Traditionally, the shelf-life and safety of foods have been achieved by thermal processing. Low temperature long time and high temperature short time treatments are the most commonly used hurdles for the pasteurization of fluid foods and raw materials. However, the thermal treatments can reduce the product quality and freshness. Consequently, some non-thermal pasteurization process have been proposed during the last decades, including high hydrostatic pressure, pulsed electric field, ultrasound (US), and high pressure homogenization (HPH). This last technique has been demonstrated to have a great potential to provide “fresh-like” products with prolonged shelf-life. Moreover, the recent developments in high-pressure-homogenization technology and the design of new homogenization valves able to withstand pressures up to 350–400 MPa have opened new opportunities to homogenization processing in the food industries and, consequently, permitted the development of new products differentiated from traditional ones by sensory and structural characteristics or functional properties. For this, this review deals with the principal mechanisms of action of HPH against microorganisms of food concern in relation to the adopted homogenizer and process parameters. In addition, the effects of homogenization on foodborne pathogenic species inactivation in relation to the food matrix and food chemico-physical and process variables will be reviewed. Also the combined use of this alternative technology with other non-thermal technologies will be considered. PMID:27536270

  10. Small, high-pressure ratio compressor mechanical acceptance test, volume 2

    NASA Technical Reports Server (NTRS)

    Metty, G. R.; Shoup, W. I.

    1973-01-01

    The fabrication and mechanical testing of the high-pressure-ratio compressor are reported. Mechanical testing was performed to demonstrate overspeed capability, adequate rotor dynamics, electrical isolation of the gas bearing trunnion mounted diffuser and shroud and the effect of operating parameters (speed and pressure ratio) on clearance of the compressor test rig. The speed range covered was 20 to 120 percent of rated speed (80,000 rpm). Following these tests an acceptance test which consisted of a 5 hour run at 80,000 rpm was made with approximately design impeller to shroud clearances. For Vol. 1, see N73-26483.

  11. 800 C Silicon Carbide (SiC) Pressure Sensors for Engine Ground Testing

    NASA Technical Reports Server (NTRS)

    Okojie, Robert S.

    2016-01-01

    MEMS-based 4H-SiC piezoresistive pressure sensors have been demonstrated at 800 C, leading to the discovery of strain sensitivity recovery with increasing temperatures above 400 C, eventually achieving up to, or near, 100 recovery of the room temperature values at 800 C. This result will allow the insertion of highly sensitive pressure sensors closer to jet, rocket, and hypersonic engine combustion chambers to improve the quantification accuracy of combustor dynamics, performance, and increase safety margin. Also, by operating at higher temperature and locating closer to the combustion chamber, reduction of the length (weight) of pressure tubes that are currently used will be achieved. This will result in reduced costlb to access space.

  12. Apparatus for Leak Testing Pressurized Hoses

    NASA Technical Reports Server (NTRS)

    Underwood, Steve D. (Inventor); Garrison, Steve G. (Inventor); Gant, Bobby D. (Inventor); Palmer, John R. (Inventor)

    2015-01-01

    A hose-attaching apparatus for leak-testing a pressurized hose may include a hose-attaching member. A bore may extend through the hose-attaching member. An internal annular cavity may extend coaxially around the bore. At least one of a detector probe hole and a detector probe may be connected to the internal annular cavity. At least a portion of the bore may have a diameter which is at least one of substantially equal to and less than a diameter of a hose to be leak-tested.

  13. Adapter assembly prevents damage to tubing during high pressure tests

    NASA Technical Reports Server (NTRS)

    Stinett, L. L.

    1965-01-01

    Portable adapter assembly prevents damage to tubing and injury to personnel when pressurizing a system or during high pressure tests. The assembly is capable of withstanding high pressure. It is securely attached to the tubing stub end and may be removed without brazing, cutting or cleaning the tube.

  14. Reproducibility of intraocular pressure peak and fluctuation of the water-drinking test.

    PubMed

    Hatanaka, Marcelo; Alencar, Luciana M; De Moraes, Carlos G; Susanna, Remo

    2013-01-01

    The water-drinking test has been used as a stress test to evaluate the drainage system of the eye. However, in order to be clinically applicable,a test must provide reproducible results with consistent measurements. This study was performed to verify the reproducibility of intraocular pressure peaks and fluctuation detected during the water-drinking test in patients with ocular hypertension and open-angle glaucoma. A prospective analysis of patients in a tertiary care unit for glaucoma treatment. Twenty-four ocular hypertension and 64 open-angle glaucoma patients not under treatment. The water-drinking test was performed in 2 consecutive days by the same examiners in patients not under treatment. Reproducibility was assessed using the intraclass correlation coefficient. Peak and fluctuation of intraocular pressure obtained with the water-drinking test were analysed for reproducibility. Eighty-eight eyes from 24 ocular hypertension and 64 open-angle glaucoma patients not under treatment were evaluated. Test and retest intraocular pressure peak values were 28.38 ± 4.64 and 28.38 ± 4.56 mmHg, respectively (P = 1.00). Test and retest intraocular pressure fluctuation values were 5.75 ± 3.9 and 4.99 ± 2.7 mmHg, respectively (P = 0.06). Based on intraclass coefficient, reproducibility was excellent for peak intraocular pressure (intraclass correlation coefficient = 0.79) and fair for intraocular pressure fluctuation (intraclass correlation coefficient = 0.37). Intraocular pressure peaks detected during the water-drinking test presented excellent reproducibility, whereas the reproducibility of fluctuation was considered fair. © 2012 The Authors. Clinical and Experimental Ophthalmology © 2012 Royal Australian and New Zealand College of Ophthalmologists.

  15. Hazards and Safeguards of High Pressure Hydraulic Fatigue Testing

    DTIC Science & Technology

    1990-07-01

    rew e I&64aN neem mde tliF by block mumber) The creation and transfer of hydraulic pressure at the 690-MPa (100,000-psi) level is in itself hazardous...our hydraulic test systems using fluids capable of flow up to the test pressure. Up to 690 MPa (100,000 psi), synthetic oils especially formulated for...HANDLING Our most frequent injury problem has been in handling the large tubular specimens. These are inherently smooth, round, oil -coated, and heavy. For

  16. Combustion Safety Simplified Test Protocol Field Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brand, L; Cautley, D.; Bohac, D.

    2015-11-05

    "9Combustions safety is an important step in the process of upgrading homes for energy efficiency. There are several approaches used by field practitioners, but researchers have indicated that the test procedures in use are complex to implement and provide too many false positives. Field failures often mean that the house is not upgraded until after remediation or not at all, if not include in the program. In this report the PARR and NorthernSTAR DOE Building America Teams provide a simplified test procedure that is easier to implement and should produce fewer false positives. A survey of state weatherization agencies onmore » combustion safety issues, details of a field data collection instrumentation package, summary of data collected over seven months, data analysis and results are included. The project provides several key results. State weatherization agencies do not generally track combustion safety failures, the data from those that do suggest that there is little actual evidence that combustion safety failures due to spillage from non-dryer exhaust are common and that only a very small number of homes are subject to the failures. The project team collected field data on 11 houses in 2015. Of these homes, two houses that demonstrated prolonged and excessive spillage were also the only two with venting systems out of compliance with the National Fuel Gas Code. The remaining homes experienced spillage that only occasionally extended beyond the first minute of operation. Combustion zone depressurization, outdoor temperature, and operation of individual fans all provide statistically significant predictors of spillage.« less

  17. Tests of a low-pressure switch protected by a saturating inductor

    NASA Astrophysics Data System (ADS)

    Lauer, E. J.; Birx, D. L.

    Low pressure switches and magnetic switches were tested as possible replacements for the high pressure switches currently used on Experimental Test Accelerator and Advanced Test Accelerator. When the low pressure switch is used with a low impedance transmission line, runaway electrons form a pinched electron beam which damages the anode. The use of the low pressure switch as the first switch in the pulsed power chain was tested; i.e., the switch would be used to connect a charged capacitor across the primary winding of a step up transformer. An inductor with a saturating core is connected in series so that, initially, there is a large inductive voltage drop. As a result, there is small voltage across the switch. By the time the inductor core saturates, the switch has developed sufficient ionization so that the switch voltage remains small, even with peak current, and an electron beam is not produced.

  18. Ambient Pressure Test Rig Developed for Testing Oil-Free Bearings in Alternate Gases and Variable Pressures

    NASA Technical Reports Server (NTRS)

    Bauman, Steven W.

    1990-01-01

    The Oil-Free Turbomachinery research team at the NASA Glenn Research Center is conducting research to develop turbomachinery systems that utilize high-speed, high temperature foil (air) bearings that do not require an oil lubrication system. Such systems combine the most advanced foil bearings from industry with NASA-developed hightemperature solid-lubricant technology. New applications are being pursued, such as Oil- Free turbochargers, auxiliary power units, and turbine propulsion systems for aircraft. An Oil-Free business jet engine, for example, would be simpler, lighter, more reliable, and less costly to purchase and maintain than current engines. Another application is NASA's Prometheus mission, where gas bearings will be required for the closed-cycle turbine based power-conversion system of a nuclear power generator for deep space. To support these applications, Glenn's Oil-Free Turbomachinery research team developed the Ambient Pressure Test Rig. Using this facility, researchers can load and heat a bearing and evaluate its performance with reduced air pressure to simulate high altitude conditions. For the nuclear application, the test chamber can be purged with gases such as helium to study foil gas bearing operation in working fluids other than air.

  19. 30 CFR 250.425 - What are the requirements for pressure testing liners?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations...) You must test each drilling liner (and liner-lap) to a pressure at least equal to the anticipated... drilling or other down-hole operations until you obtain a satisfactory pressure test. If the pressure...

  20. Managing blood pressure control in Asian patients: safety and efficacy of losartan.

    PubMed

    Cheung, Tommy Tsang; Cheung, Bernard Man Yung

    2014-01-01

    Hypertension is common in Asian populations and is a major cause of cardiovascular diseases. The prevalence of hypertension is increasing in many Asian countries. The overall prevalence of hypertension in India and the People's Republic of China has been estimated to be 20.6% in men and 22.6% in women. However, the rates of detection, treatment, and control of hypertension remain low in Asia. This reflects a low level of literacy and education, as well as a low level of access to medical care. To overcome these obstacles, strategies targeted at education, promotion, and optimization of medical care, are crucial to achieve target blood pressure control. Angiotensin receptor blockers are one of the first-line treatments for essential hypertension because they confer better cardiovascular outcomes. Losartan has been widely evaluated for the management of hypertension. Although some studies suggested that the blood pressure-lowering effect of losartan is perhaps lower than for other angiotensin receptor blockers, losartan has been demonstrated to be beneficial in terms of renal protection in patients with diabetes, heart failure resulting from either systolic or diastolic dysfunction, and diuretic-induced hyperuricemia. However, most of these data were obtained from Caucasian populations. The efficacy and safety of losartan in Asian populations may be different because of genetic and ethnic variations. Therefore, the efficacy and safety of losartan in Asian patients with hypertension warrant further study.

  1. Partial pressure analysis in space testing

    NASA Technical Reports Server (NTRS)

    Tilford, Charles R.

    1994-01-01

    For vacuum-system or test-article analysis it is often desirable to know the species and partial pressures of the vacuum gases. Residual gas or Partial Pressure Analyzers (PPA's) are commonly used for this purpose. These are mass spectrometer-type instruments, most commonly employing quadrupole filters. These instruments can be extremely useful, but they should be used with caution. Depending on the instrument design, calibration procedures, and conditions of use, measurements made with these instruments can be accurate to within a few percent, or in error by two or more orders of magnitude. Significant sources of error can include relative gas sensitivities that differ from handbook values by an order of magnitude, changes in sensitivity with pressure by as much as two orders of magnitude, changes in sensitivity with time after exposure to chemically active gases, and the dependence of the sensitivity for one gas on the pressures of other gases. However, for most instruments, these errors can be greatly reduced with proper operating procedures and conditions of use. In this paper, data are presented illustrating performance characteristics for different instruments and gases, operating parameters are recommended to minimize some errors, and calibrations procedures are described that can detect and/or correct other errors.

  2. Testing for Controlled Rapid Pressurization

    DOE Data Explorer

    Steven Knudsen

    2014-09-03

    Borehole W1 is a NQ core hole drilled at our test site in Socorro. The rock is rhyolite. Borehole W1 which was used to test gas-gas explosive mixtures is 55 feet deep with casing (pinkish in the drawing) set to 35 feet. The model is a representation of the borehole and the holes we cored around the central borehole after the test. The brown colored core holes showed dye when we filled W1 with water and slightly pressurized it. This indicates there was some path between W1 and the colored core hole. The core holes are shown to their TD in the drawing. The green plane is a fracture plane which we believe is the result of the explosions of the gas mixture in W1. Data resource is a 2D .pdf Solid Works Drawing of borehole w-1

  3. Overview of NASA White Sands Test Facility Composite Overwrapped Pressure Vessel Testing

    NASA Technical Reports Server (NTRS)

    Greene, Nathanael; Saulsberry, Regor; Thesken, John; Phoenix, Leigh

    2006-01-01

    This viewgraph presentation examines the White Sands Test Facility testing of Composite overwrapped pressure vessel (COPV). A COPV is typically a metallic liner overwrapped with a fiber epoxy matrix. There is a weight advantage over the traditional all metal design. The presentation shows pictures of the facilities at White Sands, and then examines some of the testing performed. The tests include fluids compatibility, and Kevlar COPV. Data for the Kevlar tests are given, and an analysis is reviewed. There is also a comparison between Carbon COPVs and the Kevlar COPVs.

  4. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure... valves, inside BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed...

  5. Safety of regadenoson stress testing in patients with pulmonary hypertension.

    PubMed

    Moles, Victor M; Cascino, Thomas; Saleh, Ashraf; Mikhova, Krasimira; Lazarus, John J; Ghannam, Michael; Yun, Hong J; Konerman, Matthew; Weinberg, Richard L; Ficaro, Edward P; Corbett, James R; McLaughlin, Vallerie V; Murthy, Venkatesh L

    2018-06-01

    We sought to determine the safety of regadenoson stress testing in patients with PH. PH is increasingly recognized at more advanced ages. As many as one-third of patients with PH have coronary artery disease. Because of their physical limitations, patients with PH are unable to adequately exercise. Regadenoson can potentially have an adverse impact due to their tenuous hemodynamics. Current guidelines suggest performing a coronary angiography in patients with PH who have angina or multiple coronary risk factors. We identified 67 consecutive patients with confirmed PH by catheterization (mean PA > 25 mmHg not due to left heart disease) who underwent MPI with regadenoson stress. Medical records were reviewed to determine hemodynamic and ECG response to regadenoson. No serious events occurred. Common side effects related to regadenoson were observed, dyspnea being the most common (70.6%). No syncope occurred. Heart rate increased from 74.6 ± 14 to 96.3 ± 18.3 bpm, systolic blood pressure increased from 129.8 ± 20.9 to 131.8 ± 31 mmHg, and diastolic blood pressure decreased from 77.1 ± 11.4 to 72.9 ± 15.3 mmHg. There was no ventricular tachycardia, ventricular fibrillation, or second- or third-degree atrioventricular block. Regadenoson stress MPI appears to be well tolerated and safe in patients with PH.

  6. High Pressure Quick Disconnect Particle Impact Tests

    NASA Technical Reports Server (NTRS)

    Rosales, Keisa R.; Stoltzfus, Joel M.

    2009-01-01

    NASA Johnson Space Center White Sands Test Facility (WSTF) performed particle impact testing to determine whether there is a particle impact ignition hazard in the quick disconnects (QDs) in the Environmental Control and Life Support System (ECLSS) on the International Space Station (ISS). Testing included standard supersonic and subsonic particle impact tests on 15-5 PH stainless steel, as well as tests performed on a QD simulator. This paper summarizes the particle impact tests completed at WSTF. Although there was an ignition in Test Series 4, it was determined the ignition was caused by the presence of a machining imperfection. The sum of all the test results indicates that there is no particle impact ignition hazard in the ISS ECLSS QDs. KEYWORDS: quick disconnect, high pressure, particle impact testing, stainless steel

  7. 30 CFR 250.427 - What are the requirements for pressure integrity tests?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... related hole-behavior observations, such as pore-pressure test results, gas-cut drilling fluid, and well... integrity tests? 250.427 Section 250.427 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE... Operations Casing and Cementing Requirements § 250.427 What are the requirements for pressure integrity tests...

  8. Time Pressure in Scenario-Based Online Construction Safety Quizzes and Its Effect on Students' Performance

    ERIC Educational Resources Information Center

    Jaeger, Martin; Adair, Desmond

    2017-01-01

    Online quizzes have been shown to be effective learning and assessment approaches. However, if scenario-based online construction safety quizzes do not include time pressure similar to real-world situations, they reflect situations too ideally. The purpose of this paper is to compare engineering students' performance when carrying out an online…

  9. Test plan and report for Space Shuttle launch environment testing of Bergen cable technology safety cable

    NASA Technical Reports Server (NTRS)

    Ralph, John

    1992-01-01

    Bergen Cable Technology (BCT) has introduced a new product they refer to as 'safety cable'. This product is intended as a replacement for lockwire when installed per Aerospace Standard (AS) 4536 (included in Appendix D of this document). Installation of safety cable is reportedly faster and more uniform than lockwire. NASA/GSFC proposes to use this safety cable in Shuttle Small Payloads Project (SSPP) applications on upcoming Shuttle missions. To assure that BCT safety cable will provide positive locking of fasteners equivalent to lockwire, the SSPP will conduct vibration and pull tests of the safety cable.

  10. Navier-Stokes flow field analysis of compressible flow in a high pressure safety relief valve

    NASA Technical Reports Server (NTRS)

    Vu, Bruce; Wang, Ten-See; Shih, Ming-Hsin; Soni, Bharat

    1993-01-01

    The objective of this study is to investigate the complex three-dimensional flowfield of an oxygen safety pressure relieve valve during an incident, with a computational fluid dynamic (CFD) analysis. Specifically, the analysis will provide a flow pattern that would lead to the expansion of the eventual erosion pattern of the hardware, so as to combine it with other findings to piece together a most likely scenario for the investigation. The CFD model is a pressure based solver. An adaptive upwind difference scheme is employed for the spatial discretization, and a predictor, multiple corrector method is used for the velocity-pressure coupling. The computational result indicated vortices formation near the opening of the valve which matched the erosion pattern of the damaged hardware.

  11. Ten year environmental test of glass fiber/epoxy pressure vessels

    NASA Technical Reports Server (NTRS)

    Faddoul, J. R.

    1985-01-01

    By the beginning of the 1970's composite pressure vessels had received a significant amount of development effort, and applications were beginning to be investigated. One of the first applications grew out of NASA Johnson Space Center efforts to develop a superior emergency breathing system for firemen. While the new breathing system provided improved wearer comfort and an improved mask and regulator, the primary feature was low weight which was achieved by using a glass fiber reinforced aluminum pressure vessel. Part of the development effort was to evaluate the long term performance of the pressure vessel and as a consequence, some 30 bottles for a test program were procured. These bottles were then provided to NASA Lewis Research Center where they were maintained in an outdoor environment in a pressurized condition for a period of up to 10 yr. During this period, bottles were periodically subjected to cyclic and burst testing. There was no protective coating applied to the fiberglass/epoxy composite, and significant loss in strength did occur as a result of the environment. Similar bottles stored indoors showed little, if any, degradation. This report contains a description of the pressure vessels, a discussion of the test program, data for each bottle, and appropriate plots, comparisons, and conclusions.

  12. Laboratory evaluation of the pressure water level data logger manufactured by Infinities USA, Inc.: results of pressure and temperature tests

    USGS Publications Warehouse

    Carnley, Mark V.

    2015-01-01

    The Pressure Water Level Data Logger manufactured by Infinities USA, Inc., was evaluated by the U.S. Geological Survey (USGS) Hydrologic Instrumentation Facility for conformance with the manufacturer’s stated accuracy specifications for measuring pressure throughout the device’s operating temperature range and with the USGS accuracy requirements for water-level measurements. The Pressure Water Level Data Logger (Infinities Logger) is a submersible, sealed, water-level sensing device with an operating pressure range of 0 to 11.5 feet of water over a temperature range of −18 to 49 degrees Celsius. For the pressure range tested, the manufacturer’s accuracy specification of 0.1 percent of full scale pressure equals an accuracy of ±0.138 inch of water. Three Infinities Loggers were evaluated, and the testing procedures followed and results obtained are described in this report. On the basis of the test results, the device is poorly compensated for temperature. For the three Infinities Loggers, the mean pressure differences varied from –4.04 to 5.32 inches of water and were not within the manufacturer’s accuracy specification for pressure measurements made within the temperature-compensated range. The device did not meet the manufacturer’s stated accuracy specifications for pressure within its temperature-compensated operating range of –18 to 49 degrees Celsius or the USGS accuracy requirements of no more than 0.12 inch of water (0.01 foot of water) or 0.10 percent of reading, whichever is larger. The USGS accuracy requirements are routinely examined and reported when instruments are evaluated at the Hydrologic Instrumentation Facility. The estimated combined measurement uncertainty for the pressure cycling test was ±0.139 inch of water, and for temperature, the cycling test was ±0.127 inch of water for the three Infinities Loggers.

  13. Pressure control and analysis report: Hydrogen Thermal Test Article (HTTA)

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Tasks accomplished during the HTTA Program study period included: (1) performance of a literature review to provide system guidelines; (2) development of analytical procedures needed to predict system performance; (3) design and analysis of the HTTA pressurization system considering (a) future utilization of results in the design of a spacecraft maneuvering system propellant package, (b) ease of control and operation, (c) system safety, and (d) hardware cost; and (4) making conclusions and recommendations for systems design.

  14. Fire safety in space - beyond flammability testing of small samples

    NASA Astrophysics Data System (ADS)

    Jomaas, Grunde; Torero, Jose L.; Eigenbrod, Christian; Niehaus, Justin; Olson, Sandra L.; Ferkul, Paul V.; Legros, Guillaume; Fernandez-Pello, A. Carlos; Cowlard, Adam J.; Rouvreau, Sebastien; Smirnov, Nickolay; Fujita, Osamu; T`ien, James S.; Ruff, Gary A.; Urban, David L.

    2015-04-01

    An international research team has been assembled to reduce the uncertainty and risk in the design of spacecraft fire safety systems by testing material samples in a series of flight experiments (Saffire 1, 2, and -3) to be conducted in an Orbital Science Corporation Cygnus vehicle after it has undocked from the International Space Station (ISS). The tests will be fully automated with the data downlinked at the conclusion of the test before the Cygnus vehicle re-enters the atmosphere. The unmanned, pressurized environment in the Saffire experiments allows for the largest sample sizes ever to be tested for material flammability in microgravity, which will be based on the characteristics of flame spread over the surface of the combustible material. Furthermore, the experiments will have a duration that is unmatched in scale compared to earth based microgravity research facilities such as drop towers (about 5 s) and parabolic flights (about 20 s). In contrast to sounding rockets, the experiments offer a much larger volume, and the reduction in the oxygen concentration during the Saffire experiments will be minimal. The selection of the experimental settings for the first three Saffire experiments has been based on existing knowledge of scenarios that are relevant, yet challenging, for a spacecraft environment. Given that there is always airflow in the space station, all the experiments are conducted with flame spread in either concurrent or opposed flow, though with the flow being stopped in some tests, to simulate the alarm mode environment in the ISS and thereby also to study extinguishment. The materials have been selected based on their known performance in NASA STD-6001Test-1, and with different materials being classified as charring, thermally thin, and thermally thick. Furthermore, materials with non-uniform surfaces will be investigated.

  15. Application of separate pressure test in oilfield development

    NASA Astrophysics Data System (ADS)

    Jingjun, Guo

    2018-06-01

    Based on the analysis of separate pressure testing data of injection wells and the actual situations of oilfield development, this paper discusses several application examples of these testing data in evaluating the effect of reservoir development, optimizating injection wells scheme adjustment, guiding oil and water wells to increase production and injection and preventing casing damage.

  16. 78 FR 67206 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0079] Qualification Tests for Safety-Related Actuators in..., ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants.'' This RG is being revised to provide... power plants. This RG is proposed Revision 1 of RG 1.73, ``Qualification Tests of Electric Valve...

  17. FFTF Passive Safety Test Data for Benchmarks for New LMR Designs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wootan, David W.; Casella, Andrew M.

    Liquid Metal Reactors (LMRs) continue to be considered as an attractive concept for advanced reactor design. Software packages such as SASSYS are being used to im-prove new LMR designs and operating characteristics. Significant cost and safety im-provements can be realized in advanced liquid metal reactor designs by emphasizing inherent or passive safety through crediting the beneficial reactivity feedbacks associ-ated with core and structural movement. This passive safety approach was adopted for the Fast Flux Test Facility (FFTF), and an experimental program was conducted to characterize the structural reactivity feedback. The FFTF passive safety testing pro-gram was developed to examine howmore » specific design elements influenced dynamic re-activity feedback in response to a reactivity input and to demonstrate the scalability of reactivity feedback results to reactors of current interest. The U.S. Department of En-ergy, Office of Nuclear Energy Advanced Reactor Technology program is in the pro-cess of preserving, protecting, securing, and placing in electronic format information and data from the FFTF, including the core configurations and data collected during the passive safety tests. Benchmarks based on empirical data gathered during operation of the Fast Flux Test Facility (FFTF) as well as design documents and post-irradiation examination will aid in the validation of these software packages and the models and calculations they produce. Evaluation of these actual test data could provide insight to improve analytical methods which may be used to support future licensing applications for LMRs« less

  18. Normal-pressure Tests of Circular Plates with Clamped Edges

    NASA Technical Reports Server (NTRS)

    Mcpherson, Albert E; Ramberg, Walter; Levy, Samuel

    1942-01-01

    A fixture is described for making normal-pressure tests of flat plates 5 inches in diameter in which particular care was taken to obtain rigid clamping at the edges. Results are given for 19 plates, ranging in thickness from 0.015 to 0.072 inch. The center deflections and the extreme-fiber stresses at low pressures were found to agree with theoretical values; the center deflections at high pressures were 4 to 12 percent greater than the theoretical values. Empirical curves are derived of the pressure for the beginning of permanent set as a function of the dimensions of the plate and the tensile properties of the material.

  19. Normal-Pressure Tests of Circular Plates with Clamped Edges

    NASA Technical Reports Server (NTRS)

    Mcpherson, Albert E; Ramberg, Walter; Levy, Samuel

    1942-01-01

    A fixture is described for making normal-pressure tests of flat plates 5 inches in diameter in which particular care was taken to obtain rigid clamping at the edges. Results are given for 19 plates, ranging in thickness form 0.015 to 0.072 inch. The center deflections and the extreme-fiber stresses at low pressures were found to agree with theoretical values; the center deflections at high pressures were 4 to 12 percent greater than the theoretical values. Empirical curves are derived of the pressure for the beginning of the permanent set as a function of the dimensions of the plate and the tensile properties of the material.

  20. Correction of Pressure Drop in Steam and Water System in Performance Test of Boiler

    NASA Astrophysics Data System (ADS)

    Liu, Jinglong; Zhao, Xianqiao; Hou, Fanjun; Wu, Xiaowu; Wang, Feng; Hu, Zhihong; Yang, Xinsen

    2018-01-01

    Steam and water pressure drop is one of the most important characteristics in the boiler performance test. As the measuring points are not in the guaranteed position and the test condition fluctuation exsits, the pressure drop test of steam and water system has the deviation of measuring point position and the deviation of test running parameter. In order to get accurate pressure drop of steam and water system, the corresponding correction should be carried out. This paper introduces the correction method of steam and water pressure drop in boiler performance test.

  1. SPERT I DESTRUCTIVE TEST PROGRAM SAFETY ANALYSIS REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spano, A.H.; Miller, R.W.

    1962-06-15

    The water-moderated core used for destructive experiments is mounted in the Spent I open-type reactor vessel, which has no provision for pressurization or forced coolant flow. The core is an array of highly enriched aluminum clad, plate-type fuel assemblies, using four bladetype, gang-operated control rods. Reactor transients are initiated at ambient temperature by step-insentions of reactivity, using a control rod which can be quickly ejected from the core. Following an initial series of static measurements to determine the basic- reactor properties of the test core, a series of nondestructive, self-limiting power excursion tests was performed, which covered a reactor periodmore » range down to the point where minor fuel plate damage first occurred -approximately for a 10- msec period test. These tests provided power, temperature, and pressure data. Additional kinetic teste in the period region between 10 and 5 msec were completed to explore the region of limited core damage. Fuel plate damage results included plate distortion, cladding cracking, and fuel melting. These exploratory tests were valuable in revealing unexpected changes in the dependence of pressure, temperature, burst energy, and burst shape parameters on reactor period, although the dependence of peak power on reactor period was not significantly changed. An evaluation of hazards involved in conducting the 2- msec test, based on pessimistic assumptions regarding fission product release and weather conditions, indicates that with the procedural controls normally exercised in the conduct of any transient test at Spent and the special controls to be in effect during the destructive test series, no significant hazard to personnel or to the general public will be obtained. All nuclear operation is conducted remotely approximately 1/2 mile from the reactor building. Discussion is also given of the supervision and control of personnel during and after each destructive test, and of the plans for re

  2. Thermodynamic Vent System Performance Testing with Subcooled Liquid Methane and Gaseous Helium Pressurant

    NASA Technical Reports Server (NTRS)

    Flachbart, R. H.; Hastings, L. J.; Hedayat, A.; Nelson, S. L.; Tucker, S. P.

    2007-01-01

    Due to its high specific impulse and favorable thermal properties for storage, liquid methane (LCH4) is being considered as a candidate propellant for exploration architectures. In order to gain an -understanding of any unique considerations involving micro-gravity pressure control with LCH4, testing was conducted at the Marshall Space Flight Center using the Multipurpose Hydrogen Test Bed (MHTB) to evaluate the performance of a spray-bar thermodynamic vent system (TVS) with subcooled LCH4 and gaseous helium (GHe) pressurant. Thirteen days of testing were performed in November 2006, with total tank heat leak conditions of about 715 W and 420 W at a fill level of approximately 90%. The TVS system was used to subcool the LCH4 to a liquid saturation pressure of approximately 55.2 kPa before the tank was pressurized with GHe to a total pressure of 165.5 kPa. A total of 23 TVS cycles were completed. The TVS successfully controlled the ullage pressure within a prescribed control band but did not maintain a stable liquid saturation pressure. This was likely. due to a TVS design not optimized for this particular propellant and test conditions, and possibly due to a large artificially induced heat input directly into the liquid. The capability to reduce liquid saturation pressure as well as maintain it within a prescribed control band, demonstrated that the TVS could be used to seek and maintain a desired liquid inlet temperature for an engine (at a cost of propellant lost through the TVS vent). One special test was conducted at the conclusion of the planned test activities. Reduction of the tank ullage pressure by opening the Joule-Thomson valve (JT) without operating the pump was attempted. The JT remained open for over 9300 seconds, resulting in an ullage pressure reduction of 30 kPa. The special test demonstrated the feasibility of using the JT valve for limited ullage pressure reduction in the event of a pump failure.

  3. Safety and clinical performance of acoustic reflex tests.

    PubMed

    Hunter, L L; Ries, D T; Schlauch, R S; Levine, S C; Ward, W D

    1999-12-01

    Safety and effectiveness of acoustic reflex tests are important issues because these tests are widely applied to screen for retrocochlear pathology. Previous studies have reported moderately high sensitivity and specificity for detection of acoustic neuroma. However, there have been reports of possible iatrogenic hearing loss resulting from acoustic reflex threshold (ART) and decay (ARD) tests. This study assessed safety and clinical performance of ART tests for detection of acoustic neuroma. We report a case in which ARD testing resulted in a significant bilateral permanent threshold shift. This case was the impetus for us to investigate the clinical utility of ART and ARD tests. We analyzed sensitivity and specificity of ART, as well as asymmetry in pure-tone thresholds (PTT) for detection of acoustic neuroma in 56 tumor and 108 non-tumor ears. Sensitivity and specificity were higher for PTT asymmetry than for ART. Ipsilateral ART at 1000 Hz had poor sensitivity and specificity for detection of acoustic neuroma, and involves some potential risk to residual hearing for presentation levels higher than 115 dB SPL. Approximately half of the acoustic neuroma group had ipsilateral ARTs that would require administration of ARD tests at levels exceeding 115 dB SPL. Therefore, we conclude that PTT asymmetry is a more effective test for detection of acoustic neuroma, and involves no risk to residual hearing. Future studies of contralateral reflex threshold and ARD in combination with PTT asymmetry are recommended.

  4. 30 CFR 35.21 - Temperature-pressure spray-ignition tests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... device shall be provided. (c) Test procedures. (1) A 21/2-quart sample of the fluid shall be poured into... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Temperature-pressure spray-ignition tests. 35..., EVALUATION, AND APPROVAL OF MINING PRODUCTS FIRE-RESISTANT HYDRAULIC FLUIDS Test Requirements § 35.21...

  5. Application of Formation Testing While Drilling (GeoTap) for acquiring formation pressure data from the Azeri, Chirag and Guneshli wells which were drilled in the Khazarian-Caspian Sea of the Azerbaijan Republic

    NASA Astrophysics Data System (ADS)

    Amirov, Elnur

    2016-04-01

    A new technology to acquire wireline quality pressure tests using a Logging While Drilling approach has been successfully implemented few years ago in Azeri, Chirag and Guneshli wells which were drilled in the Khazarian-Caspian Sea of the Azerbaijan Republic. The Formation Tester While Drilling tool (GeoTap) uses a testing sequence similar to wireline tools. A single probe is extended to the borehole wall and a small pretest volume withdrawn from the formation. The resulting pressure transient is then analyzed for formation pressure, formation permeability and mobility information. Up-link and down-link capabilities have been added to achieve test control and quality feedback. An efficient downlink algorithm is used downhole to analyze the data. The parameters and pressure data are transmitted to the surface in real-time for continuous monitoring of the test. More detailed pressure data is recorded and retrieved after returning to surface. Use of a quartz gauge allows excellent accuracy. Azeri, Chirag and Guneshli fields consist of layered sand reservoirs alternation with shale sequences and detailed pressure data is acquired on a high percentage of wells in order to understand lateral and vertical continuity of different flow units. The formation tester can be utilized with the 'triple combo' Logging While Drilling string which eliminates the need to rig up wireline on many wells. Wireline formation tester runs are time consuming - particularly if high deviation or high overbalance conditions are encountered requiring pipe conveyed techniques. Non-Productive Time is high when the wireline tools are stuck and fishing operations are required. The Sperry Drilling GeoTap formation pressure tester service provides real-time formation pressure measurements. It bridges the critical gap between drilling safety and optimization, by providing early and reliable measurements of key reservoir properties, while improving reservoir understanding and completion design in real

  6. Managing blood pressure control in Asian patients: safety and efficacy of losartan

    PubMed Central

    Cheung, Tommy Tsang; Cheung, Bernard Man Yung

    2014-01-01

    Hypertension is common in Asian populations and is a major cause of cardiovascular diseases. The prevalence of hypertension is increasing in many Asian countries. The overall prevalence of hypertension in India and the People’s Republic of China has been estimated to be 20.6% in men and 22.6% in women. However, the rates of detection, treatment, and control of hypertension remain low in Asia. This reflects a low level of literacy and education, as well as a low level of access to medical care. To overcome these obstacles, strategies targeted at education, promotion, and optimization of medical care, are crucial to achieve target blood pressure control. Angiotensin receptor blockers are one of the first-line treatments for essential hypertension because they confer better cardiovascular outcomes. Losartan has been widely evaluated for the management of hypertension. Although some studies suggested that the blood pressure-lowering effect of losartan is perhaps lower than for other angiotensin receptor blockers, losartan has been demonstrated to be beneficial in terms of renal protection in patients with diabetes, heart failure resulting from either systolic or diastolic dysfunction, and diuretic-induced hyperuricemia. However, most of these data were obtained from Caucasian populations. The efficacy and safety of losartan in Asian populations may be different because of genetic and ethnic variations. Therefore, the efficacy and safety of losartan in Asian patients with hypertension warrant further study. PMID:24672231

  7. High temperature pressurized high frequency testing rig and test method

    DOEpatents

    De La Cruz, Jose; Lacey, Paul

    2003-04-15

    An apparatus is described which permits the lubricity of fuel compositions at or near temperatures and pressures experienced by compression ignition fuel injector components during operation in a running engine. The apparatus consists of means to apply a measured force between two surfaces and oscillate them at high frequency while wetted with a sample of the fuel composition heated to an operator selected temperature. Provision is made to permit operation at or near the flash point of the fuel compositions. Additionally a method of using the subject apparatus to simulate ASTM Testing Method D6079 is disclosed, said method involving using the disclosed apparatus to contact the faces of prepared workpieces under a measured load, sealing the workface contact point into the disclosed apparatus while immersing said contact point between said workfaces in a lubricating media to be tested, pressurizing and heating the chamber and thereby the fluid and workfaces therewithin, using the disclosed apparatus to impart a differential linear motion between the workpieces at their contact point until a measurable scar is imparted to at least one workpiece workface, and then evaluating the workface scar.

  8. Suggestion on the safety classification of spent fuel dry storage in China’s pressurized water reactor nuclear power plant

    NASA Astrophysics Data System (ADS)

    Liu, Ting; Qu, Yunhuan; Meng, De; Zhang, Qiaoer; Lu, Xinhua

    2018-01-01

    China’s spent fuel storage in the pressurized water reactors(PWR) is stored with wet storage way. With the rapid development of nuclear power industry, China’s NPPs(NPPs) will not be able to meet the problem of the production of spent fuel. Currently the world’s major nuclear power countries use dry storage as a way of spent fuel storage, so in recent years, China study on additional spent fuel dry storage system mainly. Part of the PWR NPP is ready to apply for additional spent fuel dry storage system. It also need to safety classificate to spent fuel dry storage facilities in PWR, but there is no standard for safety classification of spent fuel dry storage facilities in China. Because the storage facilities of the spent fuel dry storage are not part of the NPP, the classification standard of China’s NPPs is not applicable. This paper proposes the safety classification suggestion of the spent fuel dry storage for China’s PWR NPP, through to the study on China’s safety classification principles of PWR NPP in “Classification for the items of pressurized water reactor nuclear power plants (GB/T 17569-2013)”, and safety classification about spent fuel dry storage system in NUREG/CR - 6407 in the United States.

  9. Fire Safety Tests for Spherical Resorcinol Formaldehyde Resin: Data Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Dong-Sang; Peterson, Reid A.; Schweiger, Michael J.

    2012-07-30

    A draft safety evaluation of the scenario for spherical resorcinol-formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping, which may be overly bounding based on the fire performance data from the manufacturer of the ion exchange resin selected for use at the WTP. To resolve this question, the fire properties of the SRF resin were measuredmore » by Southwest Research Institute (SwRI), following the American Society for Testing and Materials (ASTM) standard procedures, through a subcontract managed by Pacific Northwest National Laboratory (PNNL). For some tests, the ASTM standard procedures were not entirely appropriate or practical for the SRF resin material, so the procedures were modified and deviations from the ASTM standard procedures were noted. This report summarizes the results of fire safety tests performed and reported by SwRI. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. All as-received SwRI reports are attached to this report in the Appendix. Where applicable, the precision and bias of each test method, as given by each ASTM standard procedure, are included and compared with the SwRI test results of the SRF resin.« less

  10. 49 CFR 229.27 - Annual tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Annual tests. 229.27 Section 229.27 Transportation... TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Inspections and Tests § 229.27 Annual tests. (a) All testing... of air pressure electronically shall be tested by comparison with a test gauge or self-test designed...

  11. Suitport Feasibility: Development and Test of a Suitport and Space Suit for Human Pressurized Space Suit Donning Tests

    NASA Technical Reports Server (NTRS)

    Boyle, Robert M.; Mitchell, Kathryn; Allton, Charles; Ju, Hsing

    2012-01-01

    The suitport concept has been recently implemented as part of the small pressurized lunar rover (Currently the Space Exploration vehicle, or SEV) and the Multi-Mission Space Exploration Vehicle (MMSEV) concept demonstrator vehicle. Suitport replaces or augments the traditional airlock function of a spacecraft by providing a bulkhead opening, capture mechanism, and sealing system to allow ingress and egress of a space suit while the space suit remains outside of the pressurized volume of the spacecraft. This presents significant new opportunities to EVA exploration in both microgravity and surface environments. The suitport concept will enable three main improvements in EVA by providing reductions in: pre-EVA time from hours to less than thirty minutes; airlock consumables; contamination returned to the cabin with the EVA crewmember. To date, the first generation suitport has been tested with mockup suits on the rover cabins and pressurized on a bench top engineering unit. The work on the rover cabin has helped define the operational concepts and timelines, and has demonstrated the potential of suitport to save significant amounts of crew time before and after EVAs. The work with the engineering unit has successfully demonstrated the pressurizable seal concept including the ability to seal after the introduction and removal of contamination to the sealing surfaces. Using this experience, a second generation suitport was designed. This second generation suitport has been tested with a space suit prototype on the second generation MMSEV cabin, and testing is planned using the pressure differentials of the spacecraft. Pressurized testing will be performed using the JSC B32 Chamber B, a human rated vacuum chamber. This test will include human rated suitports, a suitport compatible prototype suit, and chamber modifications. This test will bring these three elements together in the first ever pressurized donning of a rear entry suit through a suitport. This paper presents

  12. Development Specification for RV-346/348 Positive Pressure Relief Valves (PPRV)

    NASA Technical Reports Server (NTRS)

    Ralston, Russell L.

    2017-01-01

    This specification establishes the requirements for design, performance, safety, testing, and manufacture of the RV-346 and RV-348, Positive Pressure Relief Valve (PPRV) as part of the Advanced Extravehicular Mobility Unit (EMU)(AEMU) Portable Life Support System (PLSS). The RV-346 serves as the Positive Pressure Relief Valve (PPRV), and the RV-348 serves as the Secondary Positive Pressure Relief Valve (SPPRV).

  13. Recommendations for safety testing with the in vivo comet assay.

    PubMed

    Vasquez, Marie Z

    2012-08-30

    While the in vivo comet assay increases its role in regulatory safety testing, deliberations about the interpretation of comet data continue. Concerns can arise regarding comet assay publications with limited data from non-blind testing of positive control compounds and using protocols (e.g. dose concentrations, sample times, and tissues) known to give an expected effect. There may be a tendency towards bias when the validation or interpretation of comet assay data is based on results generated by widely accepted but non-validated assays. The greatest advantages of the comet assay are its sensitivity and its ability to detect genotoxicity in tissues and at sample times that could not previously be evaluated. Guidelines for its use and interpretation in safety testing should take these factors into account. Guidelines should be derived from objective review of data generated by blind testing of unknown compounds dosed at non-toxic concentrations and evaluated in a true safety-testing environment, where the experimental design and conclusions must be defensible. However, positive in vivo comet findings with such compounds are rarely submitted to regulatory agencies and this data is typically unavailable for publication due to its proprietary nature. To enhance the development of guidelines for safety testing with the comet assay, and with the permission of several sponsors, this paper presents and discusses relevant data from multiple GLP comet studies conducted blind, with unknown pharmaceuticals and consumer products. Based on these data and the lessons we have learned through the course of conducting these studies, I suggest significant adjustments to the current conventions, and I provide recommendations for interpreting in vivo comet assay results in situations where risk must be evaluated in the absence of carcinogenicity or clinical data. Copyright © 2012 Elsevier B.V. All rights reserved.

  14. Testing of fuel/oxidizer-rich, high-pressure preburners

    NASA Technical Reports Server (NTRS)

    Lawver, B. R.

    1982-01-01

    Results of an evaluation of high pressure combustion of fuel rich and oxidizer rich LOX/RP-1 propellants using 4.0 inch diameter prototype preburner injectors and chambers are presented. Testing covered a pressure range from 8.9 to 17.5 MN/square meters (1292 to 2540 psia). Fuel rich mixture ratios ranged from 0.238 to 0.367; oxidizer rich mixture ratios ranged from 27.2 to 47.5. Performance, gas temperature uniformity, and stability data for two fuel rich and two ozidizer rich preburner injectors are presented for a conventional like-on-like (LOL) design and a platelet design injector. Kinetically limited combustion is shown by the excellent agreement of measured fuel rich gas composition and C performance data with kinetic model predictions. The oxidizer rich test results support previous equilibrium combustion predictions.

  15. Development and Validation of a Pressurization System Model for a Crossfeed Subscale Water Test Article

    NASA Technical Reports Server (NTRS)

    Nguyen, Han; Mazurkivich, Pete

    2006-01-01

    A pressurization system model was developed for a crossfeed subscale water test article using the EASY5 modeling software. The model consisted of an integrated tank pressurization and pressurization line model. The tank model was developed using the general purpose library, while the line model was assembled from the gas dynamic library. The pressurization system model was correlated to water test data obtained from nine test runs conducted on the crossfeed subscale test article. The model was first correlated to a representative test run and frozen. The correlated model was then used to predict the tank pressures and compared with the test data for eight other runs. The model prediction showed excellent agreement with the test data, allowing it to be used in a later study to analyze the pressurization system performance of a full-scale bimese vehicle with cryogenic propellants.

  16. New PANDA Tests to Investigate Effects of Light Gases on Passive Safety Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paladino, D.; Auban, O.; Candreia, P.

    The large- scale thermal-hydraulic PANDA facility (located at PSI in Switzerland), has been used over the last few years for investigating different passive decay- heat removal systems and containment phenomena for the next generation of light water reactors (Simplified Boiling Water Reactor: SBWR; European Simplified Boiling Water Reactor: ESBWR; Siedewasserreaktor: SWR-1000). Currently, as part of the European Commission 5. EURATOM Framework Programme project 'Testing and Enhanced Modelling of Passive Evolutionary Systems Technology for Containment Cooling' (TEMPEST), a new series of tests is being planned in the PANDA facility to experimentally investigate the distribution of non-condensable gases inside the containment andmore » their effect on the performance of the 'Passive Containment Cooling System' (PCCS). Hydrogen release caused by the metal-water reaction in the case of a postulated severe accident will be simulated in PANDA by injecting helium into the reactor pressure vessel. In order to provide suitable data for Computational Fluid Dynamic (CFD) code assessment and improvement, the instrumentation in PANDA has been upgraded for the new tests. In the present paper, a detailed discussion is given of the new PANDA tests to be performed to investigate the effects of light gas on passive safety systems. The tests are scheduled for the first half of the year 2002. (authors)« less

  17. 30 CFR 250.804 - Production safety-system testing and records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production Safety Systems § 250.804 Production safety-system testing and records. (a... excess of 200 cubic centimeters per minute or a gas leakage rate in excess of 5 cubic feet per minute is...

  18. Freshwater Fish Sublethal Tests: A Review of the Sublethal Tests

    EPA Science Inventory

    Pressure on animal testing has traditionally been the purview of mammalian toxicological science, but in the past few years, more attention is given also to environmental safety. As with higher vertebrate animal alternatives, balance between reduce animal use without impairing o...

  19. 14 CFR 415.129 - Flight safety system test data.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., acceptance, age surveillance, and preflight testing of a flight safety system and its subsystems and..., subsystem, and component testing requirements of part 417 of this chapter and appendix E to part 417 of this... demonstrate similarity by performing the analysis required by appendix E of part 417 of this chapter. The...

  20. 14 CFR 415.129 - Flight safety system test data.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., acceptance, age surveillance, and preflight testing of a flight safety system and its subsystems and..., subsystem, and component testing requirements of part 417 of this chapter and appendix E to part 417 of this... demonstrate similarity by performing the analysis required by appendix E of part 417 of this chapter. The...

  1. 14 CFR 415.129 - Flight safety system test data.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., acceptance, age surveillance, and preflight testing of a flight safety system and its subsystems and..., subsystem, and component testing requirements of part 417 of this chapter and appendix E to part 417 of this... demonstrate similarity by performing the analysis required by appendix E of part 417 of this chapter. The...

  2. 14 CFR 415.129 - Flight safety system test data.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., acceptance, age surveillance, and preflight testing of a flight safety system and its subsystems and..., subsystem, and component testing requirements of part 417 of this chapter and appendix E to part 417 of this... demonstrate similarity by performing the analysis required by appendix E of part 417 of this chapter. The...

  3. 14 CFR 415.129 - Flight safety system test data.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., acceptance, age surveillance, and preflight testing of a flight safety system and its subsystems and..., subsystem, and component testing requirements of part 417 of this chapter and appendix E to part 417 of this... demonstrate similarity by performing the analysis required by appendix E of part 417 of this chapter. The...

  4. The oil pressure test of the hydraulic impeller blade

    NASA Astrophysics Data System (ADS)

    Ye, Wen-bo; Jia, Li-tao

    2017-12-01

    This article introduced the structure of the Kaplan runner in hydropower station and the operating process of the oil pressure test has been described. What’s more, the whole process, including filling oil to the runner hub, the movement of the runner blade, the oil circuit, have been presented in detail.Since the manipulation of the oil circuit which controlled by three Valve groups consisting of six valves was complicated, the author is planning to replace them with 3-position 3-way electromagnetic valves, so we can simplify the operation procedure.The author hopes this article can provide technical reference for the oil pressure test.

  5. 30 CFR 250.1625 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... drills. 250.1625 Section 250.1625 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Operations § 250.1625 Blowout preventer system testing, records, and drills. (a) Prior to conducting high..., upper and lower kelly cocks, and drill-string safety valves shall be pressure tested to pipe-ram test...

  6. 30 CFR 250.1625 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... drills. 250.1625 Section 250.1625 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Operations § 250.1625 Blowout preventer system testing, records, and drills. (a) Prior to conducting high..., upper and lower kelly cocks, and drill-string safety valves shall be pressure tested to pipe-ram test...

  7. 30 CFR 250.1625 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... drills. 250.1625 Section 250.1625 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Operations § 250.1625 Blowout preventer system testing, records, and drills. (a) Prior to conducting high..., upper and lower kelly cocks, and drill-string safety valves shall be pressure tested to pipe-ram test...

  8. Safety modelling and testing of lithium-ion batteries in electrified vehicles

    NASA Astrophysics Data System (ADS)

    Deng, Jie; Bae, Chulheung; Marcicki, James; Masias, Alvaro; Miller, Theodore

    2018-04-01

    To optimize the safety of batteries, it is important to understand their behaviours when subjected to abuse conditions. Most early efforts in battery safety modelling focused on either one battery cell or a single field of interest such as mechanical or thermal failure. These efforts may not completely reflect the failure of batteries in automotive applications, where various physical processes can take place in a large number of cells simultaneously. In this Perspective, we review modelling and testing approaches for battery safety under abuse conditions. We then propose a general framework for large-scale multi-physics modelling and experimental work to address safety issues of automotive batteries in real-world applications. In particular, we consider modelling coupled mechanical, electrical, electrochemical and thermal behaviours of batteries, and explore strategies to extend simulations to the battery module and pack level. Moreover, we evaluate safety test approaches for an entire range of automotive hardware sets from cell to pack. We also discuss challenges in building this framework and directions for its future development.

  9. Abdomen Impact Testing of the Hybrid III Rail Safety (H3-RS) Anthropomorphic Test Device

    DOT National Transportation Integrated Search

    2017-09-01

    The Hybrid III Rail Safety (H3-RS) anthropomorphic test device (ATD) is a crash test dummy that was developed in the UK to evaluate abdomen and lower thorax injuries that occur when passengers impact workstation tables during train accidents. The H3-...

  10. Personnel safety with pressurized gas systems

    DOE PAGES

    Cadwallader, Lee C.; Zhao, Haihua

    2016-09-08

    In this study, selected accident case histories are described that illustrate the potential modes of injury from gas jets, pressure-driven missiles, and asphyxiants. Gas combustion hazards are also briefly mentioned. Using high-pressure helium and nitrogen, estimates of safe exclusion distances are calculated for differing pressures, temperatures, and breach sizes. Some sources for gas system reliability values are also cited.

  11. Fan Noise Source Diagnostic Test: Vane Unsteady Pressure Results

    NASA Technical Reports Server (NTRS)

    Envia, Edmane

    2002-01-01

    To investigate the nature of fan outlet guide vane pressure fluctuations and their link to rotor-stator interaction noise, time histories of vane fluctuating pressures were digitally acquired as part of the Fan Noise Source Diagnostic Test. Vane unsteady pressures were measured at seven fan tip speeds for both a radial and a swept vane configuration. Using time-domain averaging and spectral analysis, the blade passing frequency (BPF) harmonic and broadband contents of the vane pressures were individually analyzed. Significant Sound Pressure Level (SPL) reductions were observed for the swept vane relative to the radial vane for the BPF harmonics of vane pressure, but vane broadband reductions due to sweep turned out to be much smaller especially on an average basis. Cross-correlation analysis was used to establish the level of spatial coherence of broadband pressures between different locations on the vane and integral length scales of pressure fluctuations were estimated from these correlations. Two main results of this work are: (1) the average broadband level on the vane (in dB) increases linearly with the fan tip speed for both the radial and swept vanes, and (2) the broadband pressure distribution on the vane is nearly homogeneous and its integral length scale is a monotonically decreasing function of fan tip speed.

  12. Safety.

    ERIC Educational Resources Information Center

    Education in Science, 1996

    1996-01-01

    Discusses safety issues in science, including: allergic reactions to peanuts used in experiments; explosions in lead/acid batteries; and inspection of pressure vessels, such as pressure cookers or model steam engines. (MKR)

  13. Acoustic emission testing of 12-nickel maraging steel pressure vessels

    NASA Technical Reports Server (NTRS)

    Dunegan, H. L.

    1973-01-01

    Acoustic emission data were obtained from three point bend fracture toughness specimens of 12-nickel maraging steel, and two pressure vessels of the same material. One of the pressure vessels contained a prefabricated flaw which was extended and sharpened by fatigue cycling. It is shown that the flawed vessel had similar characteristics to the fracture specimens, thereby allowing estimates to be made of its nearness to failure during a proof test. Both the flawed and unflawed pressure vessel survived the proof pressure and 5 cycles to the working pressure, but it was apparent from the acoustic emission response during the proof cycle and the 5 cycles to the working pressure that the flawed vessel was very near failure. The flawed vessel did not survive a second cycle to the proof pressure before failure due to flaw extension through the wall (causing a leak).

  14. The Orion Atmosphere Revitalization Technology in Manned Ambient Pressure Space Suit Testing

    NASA Technical Reports Server (NTRS)

    Button, Amy; Sweterlitsch, Jeffrey

    2011-01-01

    An amine-based carbon dioxide (CO2) and water vapor sorbent in pressure-swing regenerable beds has been developed by Hamilton Sundstrand and baselined for the Atmosphere Revitalization System (ARS) for moderate duration missions of the Orion Multipurpose Crew Vehicle. The Orion ARS is designed to support not only open-cabin operations, tests of which have been reported in previous years at this conference, but also closed space suit-loop operations. A previous low-pressure suit loop test was performed with a human metabolic simulator, and humans wearing emergency masks were tested in a closed-loop configuration before that. In late 2011, simple tests were performed in a suit-loop configuration with human test subjects in prototype space suits with prototype umbilicals at ambient and two slightly above-ambient pressures. Trace contaminant filters and a prototype blower were also incorporated into the test rig. This paper discusses the performance of the ARS technology in that 2011 test configuration.

  15. Testing of Safety-Critical Software Embedded in an Artificial Heart

    NASA Astrophysics Data System (ADS)

    Cha, Sungdeok; Jeong, Sehun; Yoo, Junbeom; Kim, Young-Gab

    Software is being used more frequently to control medical devices such as artificial heart or robotic surgery system. While much of software safety issues in such systems are similar to other safety-critical systems (e.g., nuclear power plants), domain-specific properties may warrant development of customized techniques to demonstrate fitness of the system on patients. In this paper, we report results of a preliminary analysis done on software controlling a Hybrid Ventricular Assist Device (H-VAD) developed by Korea Artificial Organ Centre (KAOC). It is a state-of-the-art artificial heart which completed animal testing phase. We performed software testing in in-vitro experiments and animal experiments. An abnormal behaviour, never detected during extensive in-vitro analysis and animal testing, was found.

  16. Composite Overwrapped Pressure Vessels (COPV) Stress Rupture Test: Part 2. Part 2

    NASA Technical Reports Server (NTRS)

    Russell, Richard; Flynn, Howard; Forth, Scott; Greene, Nathanael; Kezirian, Michael; Varanauski, Don; Leifeste, Mark; Yoder, Tommy; Woodworth, Warren

    2010-01-01

    One of the major concerns for the aging Space Shuttle fleet is the stress rupture life of composite overwrapped pressure vessels (COPVs). Stress rupture life of a COPY has been defined as the minimum time during which the composite maintains structural integrity considering the combined effects of stress levels and time. To assist in the evaluation of the aging COPVs in the Orbiter fleet an analytical reliability model was developed. The actual data used to construct this model was from testing of COPVs constructed of similar, but not exactly same materials and pressure cycles as used on Orbiter vessels. Since no actual Orbiter COPV stress rupture data exists the Space Shuttle Program decided to run a stress rupture test to compare to model predictions. Due to availability of spares, the testing was unfortunately limited to one 40" vessel. The stress rupture test was performed at maximum operating pressure at an elevated temperature to accelerate aging. The test was performed in two phases. The first phase, 130 F, a moderately accelerated test designed to achieve the midpoint of the model predicted point reliability. A more aggressive second phase, performed at 160 F, was designed to determine if the test article will exceed the 95% confidence interval ofthe model. In phase 3, the vessel pressure was increased to above maximum operating pressure while maintaining the phase 2 temperature. After reaching enough effectives hours to reach the 99.99% confidence level of the model phase 4 testing began when the temperature was increased to greater than 170 F. The vessel was maintained at phase 4 conditions until it failed after over 3 million effect hours. This paper will discuss the results of this test, it's implications and possible follow-on testing.

  17. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0079] Qualification Tests for Safety-Related Actuators in... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants...-251- 7495, email: [email protected] . Both of the Office of Nuclear Regulatory Research, U.S. Nuclear...

  18. Payload and Components Real-Time Automated Test System (PACRATS), Data Acquisition of Leak Rate and Pressure Data Test Procedure

    NASA Technical Reports Server (NTRS)

    Rinehart, Maegan L.

    2011-01-01

    The purpose of this activity is to provide the Mechanical Components Test Facility (MCTF) with the capability to obtain electronic leak test and proof pressure data, Payload and Components Real-time Automated Test System (PACRATS) data acquisition software will be utilized to display real-time data. It will record leak rates and pressure/vacuum level(s) simultaneously. This added functionality will provide electronic leak test and pressure data at specified sampling frequencies. Electronically stored data will provide ES61 with increased data security, analysis, and accuracy. The tasks performed in this procedure are to verify PACRATS only, and are not intended to provide verifications for MCTF equipment.

  19. Pressure measurements and comfort of foam safety cushions for confined seating.

    PubMed

    Jackson, Colin; Emck, Adrian J; Hunston, Michael J; Jarvis, Philip C

    2009-06-01

    Glider flights may require the pilot to sit for many hours in a cramped cockpit that allows little movement. Experiments were undertaken to evaluate the performance of different seat cushions in a glider simulator. Subjects were male glider pilots with a maximum height of 1.85 m (6.07 ft) who participated in simulated glider flights lasting 1.5 h. A pressure-mapping device was used to determine cushion performance. By analyzing 15 subjects we calculated the pressure threshold for comfort, above which fidgeting provided objective evidence of discomfort. To determine cushion performance relative to that threshold, 20 other pilots then sat on 5 different viscoelastic foam cushions in the simulator. The time-averaged peak pressure below which no discomfort-induced fidgeting occurred was 8.8 kPa (1.28 psi). The highest peak pressure at which discomfort could be relieved by fidgeting was 11.0 kPa (1.6 psi). Of the five cushions tested, pressure remained below the discomfort threshold for almost all subjects for only one type of cushion. The best-performing cushion had a layered structure made up of approximately 25 mm of Confor C47 foam with an overlay of approximately 13 mm of Confor C45. The other types of energy-absorbing cushions tested, either with or without a softer top layer, are unlikely to provide comfortable seating solutions for most pilots. We conclude that satisfactory cushions are available for this application and that they can be objectively evaluated using this technique.

  20. Hydrogen gas embrittlement and the disc pressure test

    NASA Technical Reports Server (NTRS)

    Bachelet, E. J.; Troiano, A. R.

    1973-01-01

    A disc pressure test has been used to study the influenced of a hydrogen gas environment on the mechanical properties of three high strength superalloys, Inconel 718, L-605 and A-286, in static and dynamic conditions. The influence of the hydrogen pressure, loading rate, temperature, mechanical and thermal fatigue has investigated. The permeation characteristics of Inconel 718 have been determined in collaboration with the French AEC. The results complemented by a fractographic study are consistent either with a stress-sorption or with an internal embrittlement type of mechanism.

  1. [The Scope, Quality and Safety Requirements of Drug Abuse Testing].

    PubMed

    Küme, Tuncay; Karakükcü, Çiğdem; Pınar, Aslı; Coşkunol, Hakan

    2017-01-01

    The aim of this review is to inform about the scopes and requirements of drug abuse testing. Drug abuse testing is one of the tools for determination of drug use. It must fulfill the quality and safety requirements in judgmental legal and administrative decisions. Drug abuse testing must fulfill some requirements like selection of the appropriate test matrix, appropriate screening test panel, sampling in detection window, patient consent, identification of the donor, appropriate collection site, sample collection with observation, identification and control of the sample, specimen custody chain in preanalytical phase; analysis in authorized laboratories, specimen validity tests, reliable testing METHODS, strict quality control, two-step analysis in analytical phase; storage of the split specimen, confirmation of the split specimen in the objection, result custody chain, appropriate cut-off concentration, the appropriate interpretation of the result in postanalytical phase. The workflow and analytical processes of drug abuse testing are explained in last regulation of the Department of Medical Laboratory Services, Ministry of Health in Turkey. The clinical physicians have to know and apply the quality and safety requirements in drug abuse testing according to last regulations in Turkey.

  2. NASA GRC's High Pressure Burner Rig Facility and Materials Test Capabilities

    NASA Technical Reports Server (NTRS)

    Robinson, R. Craig

    1999-01-01

    The High Pressure Burner Rig (HPBR) at NASA Glenn Research Center is a high-velocity. pressurized combustion test rig used for high-temperature environmental durability studies of advanced materials and components. The facility burns jet fuel and air in controlled ratios, simulating combustion gas chemistries and temperatures that are realistic to those in gas turbine engines. In addition, the test section is capable of simulating the pressures and gas velocities representative of today's aircraft. The HPBR provides a relatively inexpensive. yet sophisticated means for researchers to study the high-temperature oxidation of advanced materials. The facility has the unique capability of operating under both fuel-lean and fuel-rich gas mixtures. using a fume incinerator to eliminate any harmful byproduct emissions (CO, H2S) of rich-burn operation. Test samples are easily accessible for ongoing inspection and documentation of weight change, thickness, cracking, and other metrics. Temperature measurement is available in the form of both thermocouples and optical pyrometery. and the facility is equipped with quartz windows for observation and video taping. Operating conditions include: (1) 1.0 kg/sec (2.0 lbm/sec) combustion and secondary cooling airflow capability: (2) Equivalence ratios of 0.5- 1.0 (lean) to 1.5-2.0 (rich), with typically 10% H2O vapor pressure: (3) Gas temperatures ranging 700-1650 C (1300-3000 F): (4) Test pressures ranging 4-12 atmospheres: (5) Gas flow velocities ranging 10-30 m/s (50-100) ft/sec.: and (6) Cyclic and steady-state exposure capabilities. The facility has historically been used to test coupon-size materials. including metals and ceramics. However complex-shaped components have also been tested including cylinders, airfoils, and film-cooled end walls. The facility has also been used to develop thin-film temperature measurement sensors.

  3. 30 CFR 250.425 - What are the requirements for pressure testing liners?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Casing and Cementing Requirements § 250.425 What are the requirements for pressure testing liners? (a) You must test each drilling liner (and liner-lap) to a pressure...

  4. Terahertz NDE of Stressed Composite Overwrapped Pressure Vessels - Initial Testing

    NASA Technical Reports Server (NTRS)

    Madaras, Eric I.; Seebo, Jeffrey P.; Anatasi, Robert F.

    2009-01-01

    Terahertz radiation nondestructive evaluation was applied to a set of Kevlar composite overwrapped pressure vessel bottles that had undergone a series of thermal and pressure tests to simulate stress rupture effects. The bottles in these nondestructive evaluation tests were bottles that had not ruptured but had survived various times at the elevated load and temperature levels. Some of the bottles showed evidence of minor composite failures. The terahertz radiation did detect visible surface flaws, but did not detect any internal chemical or material degradation of the thin overwraps.

  5. Performance and safety testing of lithium batteries for the Expendable, Mobile, ASW Training Target (EMATT)

    NASA Astrophysics Data System (ADS)

    Hallal, P. B.; Bis, R. F.

    1986-08-01

    The developmental EMATT (expendable, mobile, ASW training target) may use a high-energy (lithium/sulfuryl chloride) battery system. Safety problems with the original battery cell design were experienced during early performance and safety testing. After redesign of the battery cell, performance and safety tests were made under specified abuse conditions, as well as under simulated launch conditions. The test results showed that the power system now meets all safety requirements, and that the EMATT vehicle is safe to deploy for its engineering development phase.

  6. The correlation between pulsatile intracranial pressure and indices of intracranial pressure-volume reserve capacity: results from ventricular infusion testing.

    PubMed

    Eide, Per Kristian

    2016-12-01

    OBJECTIVE The objective of this study was to examine how pulsatile and static intracranial pressure (ICP) scores correlate with indices of intracranial pressure-volume reserve capacity, i.e., intracranial elastance (ICE) and intracranial compliance (ICC), as determined during ventricular infusion testing. METHODS All patients undergoing ventricular infusion testing and overnight ICP monitoring during the 6-year period from 2007 to 2012 were included in the study. Clinical data were retrieved from a quality registry, and the ventricular infusion pressure data and ICP scores were retrieved from a pressure database. The ICE and ICC (= 1/ICE) were computed during the infusion phase of the infusion test. RESULTS During the period from 2007 to 2012, 82 patients with possible treatment-dependent hydrocephalus underwent ventricular infusion testing within the department of neurosurgery. The infusion tests revealed a highly significant positive correlation between ICE and the pulsatile ICP scores mean wave amplitude (MWA) and rise-time coefficient (RTC), and the static ICP score mean ICP. The ICE was negatively associated with linear measures of ventricular size. The overnight ICP recordings revealed significantly increased MWA (> 4 mm Hg) and RTC (> 20 mm Hg/sec) values in patients with impaired ICC (< 0.5 ml/mm Hg). CONCLUSIONS In this study cohort, there was a significant positive correlation between pulsatile ICP and ICE measured during ventricular infusion testing. In patients with impaired ICC during infusion testing (ICC < 0.5 ml/mm Hg), overnight ICP recordings showed increased pulsatile ICP (MWA > 4 mm Hg, RTC > 20 mm Hg/sec), but not increased mean ICP (< 10-15 mm Hg). The present data support the assumption that pulsatile ICP (MWA and RTC) may serve as substitute markers of pressure-volume reserve capacity, i.e., ICE and ICC.

  7. Triaxial testing system for pressure core analysis using image processing technique

    NASA Astrophysics Data System (ADS)

    Yoneda, J.; Masui, A.; Tenma, N.; Nagao, J.

    2013-11-01

    In this study, a newly developed innovative triaxial testing system to investigate strength, deformation behavior, and/or permeability of gas hydrate bearing-sediments in deep sea is described. Transport of the pressure core from the storage chamber to the interior of the sealing sleeve of a triaxial cell without depressurization was achieved. An image processing technique was used to capture the motion and local deformation of a specimen in a transparent acrylic triaxial pressure cell and digital photographs were obtained at each strain level during the compression test. The material strength was successfully measured and the failure mode was evaluated under high confining and pore water pressures.

  8. 30 CFR 250.425 - What are the requirements for pressure testing liners?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Casing and Cementing Requirements § 250.425 What are the requirements for pressure testing liners? (a) You must test each drilling liner (and liner-lap) to a pressure at least equal...

  9. 30 CFR 250.425 - What are the requirements for pressure testing liners?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Casing and Cementing Requirements § 250.425 What are the requirements for pressure testing liners? (a) You must test each drilling liner (and liner-lap) to a pressure at least equal...

  10. 30 CFR 250.425 - What are the requirements for pressure testing liners?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Casing and Cementing Requirements § 250.425 What are the requirements for pressure testing liners? (a) You must test each drilling liner (and liner-lap) to a pressure at least equal...

  11. Test of pressure transducer for measuring cotton-mass flow

    USDA-ARS?s Scientific Manuscript database

    In this study, a cotton harvester yield monitor was developed based on the relationship between air pressure and the mass of seed cotton conveyed. The sensor theory was verified by laboratory tests. The sensor was tested on a cotton picker with seed cotton at two moisture contents, 5.9% and 8.5% we...

  12. 33 CFR 183.584 - Shock test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.584 Shock test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Shock test. 183.584 Section 183...

  13. 33 CFR 183.584 - Shock test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.584 Shock test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Shock test. 183.584 Section 183...

  14. 33 CFR 183.584 - Shock test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.584 Shock test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Shock test. 183.584 Section 183...

  15. 33 CFR 183.588 - Slosh test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.588 Slosh test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Slosh test. 183.588 Section 183...

  16. 33 CFR 183.588 - Slosh test.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.588 Slosh test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Slosh test. 183.588 Section 183...

  17. 33 CFR 183.584 - Shock test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.584 Shock test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Shock test. 183.584 Section 183...

  18. 33 CFR 183.588 - Slosh test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.588 Slosh test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Slosh test. 183.588 Section 183...

  19. 33 CFR 183.588 - Slosh test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.588 Slosh test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Slosh test. 183.588 Section 183...

  20. 33 CFR 183.588 - Slosh test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Slosh test. 183.588 Section 183... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.588 Slosh test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183...

  1. 33 CFR 183.584 - Shock test.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Shock test. 183.584 Section 183... SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Tests § 183.584 Shock test. A fuel tank is tested by performing the following procedures in the following order: (a) Perform the static pressure test under § 183...

  2. Design of the Electronic Brake Pressure Modulator Using a Direct Adaptive Fuzzy Controller in Commercial Vehicles for the Safety of Braking in Fail

    NASA Astrophysics Data System (ADS)

    Kim, Hunmo

    In the brake systems, it is important to reduce the rear brake pressure in order to secure the safety of the vehicle in braking. So, there was some research that reduced and controlled the rear brake pressure exactly like a L. S. P. V and a E. L. S. P. V. However, the previous research has some weaknesses: the L. S. P. V is a mechanical system and its brake efficiency is lower than the efficiency of E. L. S. P. V. But, the cost of E. L. S. P. V is very higher so its application to the vehicle is very difficult. Additionally, when a fail appears in the circuit which controls the valves, the fail results in some wrong operation of the valves. But, the previous researchers didn't take the effect of fail into account. Hence, the efficiency of them is low and the safety of the vehicle is not confirmed. So, in this paper we develop a new economical pressure modulator that exactly controls brake pressure and confirms the safety of the vehicle in any case using a direct adaptive fuzzy controller.

  3. Safety and Environment- Masterplan 2020 of DLR's Rocket Test Center Lampoldhausen

    NASA Astrophysics Data System (ADS)

    Haberzettl, Andreas; Dommers, Michael

    2013-09-01

    The German Aerospace Center DLR is the German research institute with approximately 7000 employees in 16 domestic locations. Among the research priorities of the German Aerospace Center DLR includes aerospace, energy and transport. DLR is institutionally supported by federal and state governments.Next funding sources arise in the context of third-party funds business (contract research and public contracts and subsidiaries). Main activities of the test center Lampoldshausen are testing of ARIANE's main and upper stage engines in the frame of ESA contracts.In the last years the test center of the DLR in Lampoldshausen has grown strongly, so that the number of employees is actually of about 230. The testing department is mainly responsible for rocket combustion testing according to customer requirements.Two kinds of test facilities are operated, sea level test benches and the altitude simulation test facilities.In addition to the DLR's growth also the activities of the industrial partner ASTRIUM has been elevated so that actually nearly 600 employees are present on site Lampoldshausen.The management of the site in relation to safety and security requires special measures with special respect to the presence of more people inside the testing area in order to guarantee trouble-free and safe experimental operation onsite the DLR's test plants. In order to meet with the future needs of continuing growth, the security and safety requirements have to be adopted.This report gives comprehensive outlook information about future possible scenarios of our coming tasks.Main driving force for future requests is the evolution of the rocket ARIANE. The testing of the new upper stage test facility for ARIANE 5 midlife evolution has been started. A new test position P5.2 is foreseen to perform the qualification of the new upper stage with the VINCI engine. This project will be very complex, in parallel running operation processes will require special procedures related to the overall

  4. Feasibility Study of Cyclic Pressure Testing Thick-Walled Cylinders

    DTIC Science & Technology

    1975-01-01

    Watervliet, and also • for tests on Navy barrela, is the hydrostatic pressure cycling test. This test employs a cloae-fitting, high -strength steel...mandrel to keep water volume at a minimum. High preaaure pumps then cycle the water up to the desired teat pres- • sure, thirty to fifty thousand...be accomplished using s high energy metalworking process - electrohydraulice. m • Electrohydraulica is a metalworking process which employs the

  5. SafetyAnalyst Testing and Implementation

    DOT National Transportation Integrated Search

    2009-03-01

    SafetyAnalyst is a software tool developed by the Federal Highway Administration to assist state and local transportation agencies on analyzing safety data and managing their roadway safety programs. This research report documents the major tasks acc...

  6. Developing and Testing the Health Care Safety Hotline

    PubMed Central

    Schneider, Eric C.; Ridgely, M. Susan; Quigley, Denise D.; Hunter, Lauren E.; Leuschner, Kristin J.; Weingart, Saul N.; Weissman, Joel S.; Zimmer, Karen P.; Giannini, Robert C.

    2017-01-01

    Abstract This article describes the design, development, and testing of the Health Care Safety Hotline, a prototype consumer reporting system for patient safety events. The prototype was designed and developed with ongoing review by a technical expert panel and feedback obtained during a public comment period. Two health care delivery organizations in one metropolitan area collaborated with the researchers to demonstrate and evaluate the system. The prototype was deployed and elicited information from patients, family members, and caregivers through a website or an 800 phone number. The reports were considered useful and had little overlap with information received by the health care organizations through their usual risk management, customer service, and patient safety monitoring systems. However, the frequency of reporting was lower than anticipated, suggesting that further refinements, including efforts to raise awareness by actively soliciting reports from subjects, might be necessary to substantially increase the volume of useful reports. It is possible that a single technology platform could be built to meet a variety of different patient safety objectives, but it may not be possible to achieve several objectives simultaneously through a single consumer reporting system while also establishing trust with patients, caregivers, and providers. PMID:28845353

  7. The Impact of Coworkers’ Safety Violations on an Individual Worker: A Social Contagion Effect within the Construction Crew

    PubMed Central

    Zhang, Shoujian; Su, Yikun

    2018-01-01

    This research developed and tested a model of the social contagion effect of coworkers’ safety violations on individual workers within construction crews. Both situational and routine safety violations were considered in this model. Empirical data were collected from 345 construction workers in China using a detailed questionnaire. The results showed that both types of safety violations made by coworkers were significantly related to individuals’ perceived social support and production pressure. Individuals’ attitudinal ambivalence toward safety compliance mediated the relationships between perceived social support and production pressure and both types of individuals’ safety violations. However, safety motivation only mediated the effects of perceived social support and production pressure on individuals’ situational safety violations. Further, this research supported the differences between situational and routine safety violations. Specifically, we found that individuals were more likely to imitate coworkers’ routine safety violations than their situational safety violations. Coworkers’ situational safety violations had an indirect effect on individuals’ situational safety violations mainly through perceived social support and safety motivation. By contrast, coworkers’ routine safety violations had an indirect effect on individuals’ routine safety violations mainly through perceived production pressure and attitudinal ambivalence. Finally, the theoretical and practical implications, research limitations, and future directions were discussed. PMID:29673149

  8. The Impact of Coworkers' Safety Violations on an Individual Worker: A Social Contagion Effect within the Construction Crew.

    PubMed

    Liang, Huakang; Lin, Ken-Yu; Zhang, Shoujian; Su, Yikun

    2018-04-17

    This research developed and tested a model of the social contagion effect of coworkers’ safety violations on individual workers within construction crews. Both situational and routine safety violations were considered in this model. Empirical data were collected from 345 construction workers in China using a detailed questionnaire. The results showed that both types of safety violations made by coworkers were significantly related to individuals’ perceived social support and production pressure. Individuals’ attitudinal ambivalence toward safety compliance mediated the relationships between perceived social support and production pressure and both types of individuals’ safety violations. However, safety motivation only mediated the effects of perceived social support and production pressure on individuals’ situational safety violations. Further, this research supported the differences between situational and routine safety violations. Specifically, we found that individuals were more likely to imitate coworkers’ routine safety violations than their situational safety violations. Coworkers’ situational safety violations had an indirect effect on individuals’ situational safety violations mainly through perceived social support and safety motivation. By contrast, coworkers’ routine safety violations had an indirect effect on individuals’ routine safety violations mainly through perceived production pressure and attitudinal ambivalence. Finally, the theoretical and practical implications, research limitations, and future directions were discussed.

  9. Multilayer Pressure Vessel Materials Testing and Analysis. Phase 1

    NASA Technical Reports Server (NTRS)

    Cardinal, Joseph W.; Popelar, Carl F.; Page, Richard A.

    2014-01-01

    To provide NASA a comprehensive suite of materials strength, fracture toughness and crack growth rate test results for use in remaining life calculations for aging multilayer pressure vessels, Southwest Research Institute (R) (SwRI) was contracted in two phases to obtain relevant material property data from a representative vessel. This report describes Phase 1 of this effort which includes a preliminary material property assessment as well as a fractographic, fracture mechanics and fatigue crack growth analyses of an induced flaw in the outer shell of a representative multilayer vessel that was subjected to cyclic pressure test. SwRI performed this Phase 1 effort under contract to the Digital Wave Corporation in support of their contract to Jacobs ATOM for the NASA Ames Research Center.

  10. Fire Safety Tests for Cesium-Loaded Spherical Resorcinol Formaldehyde Resin: Data Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Dong-Sang; Schweiger, Michael J.; Peterson, Reid A.

    2012-09-01

    A draft safety evaluation of the scenario for spherical resorcinol formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping. To resolve this question, the fire properties of the SRF resin were measured by Southwest Research Institute (SwRI) through a subcontract managed by Pacific Northwest National Laboratory (PNNL). The results of initial fire safety tests on themore » SRF resin were documented in a previous report (WTP-RPT-218). The present report summarizes the results of additional tests performed by SwRI on the cesium-loaded SRF resin. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. The as-received SwRI report is attached to this report in the Appendix A. Where applicable, the precision and bias of each test method, as given by each American Society for Testing and Materials (ASTM) standard procedure, are included and compared with the SwRI test results of the cesium-loaded SRF resin.« less

  11. An Online Resource for Flight Test Safety Planning

    NASA Technical Reports Server (NTRS)

    Lewis, Greg

    2007-01-01

    A viewgraph presentation describing an online database for flight test safety techniques is shown. The topics include: 1) Goal; 2) Test Hazard Analyses; 3) Online Database Background; 4) Data Gathering; 5) NTPS Role; 6) Organizations; 7) Hazard Titles; 8) FAR Paragraphs; 9) Maneuver Name; 10) Identified Hazard; 11) Matured Hazard Titles; 12) Loss of Control Causes; 13) Mitigations; 14) Database Now Open to the Public; 15) FAR Reference Search; 16) Record Field Search; 17) Keyword Search; and 18) Results of FAR Reference Search.

  12. 30 CFR 250.617 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... drills. 250.617 Section 250.617 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Gas Well-Workover Operations § 250.617 Blowout preventer system testing, records, and drills. (a) BOP... disconnecting a pressure seal in the assembly, the affected seal will be pressure tested. (c) Drills. All...

  13. 30 CFR 250.616 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... drills. 250.616 Section 250.616 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Gas Well-Workover Operations § 250.616 Blowout preventer system testing, records, and drills. (a) BOP... disconnecting a pressure seal in the assembly, the affected seal will be pressure tested. (c) Drills. All...

  14. 30 CFR 250.617 - Blowout preventer system testing, records, and drills.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... drills. 250.617 Section 250.617 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT... Gas Well-Workover Operations § 250.617 Blowout preventer system testing, records, and drills. (a) BOP... disconnecting a pressure seal in the assembly, the affected seal will be pressure tested. (c) Drills. All...

  15. Design, Analysis and Testing of a PRSEUS Pressure Cube to Investigate Assembly Joints

    NASA Technical Reports Server (NTRS)

    Yovanof, Nicolette; Lovejoy, Andrew E.; Baraja, Jaime; Gould, Kevin

    2012-01-01

    Due to its potential to significantly increase fuel efficiency, the current focus of NASA's Environmentally Responsible Aviation Program is the hybrid wing body (HWB) aircraft. Due to the complex load condition that exists in HWB structure, as compared to traditional aircraft configurations, light-weight, cost-effective and manufacturable structural concepts are required to enable the HWB. The Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) concept is one such structural concept. A building block approach for technology development of the PRSEUS concept is being conducted. As part of this approach, a PRSEUS pressure cube was developed as a risk reduction test article to examine a new integral cap joint concept. This paper describes the design, analysis and testing of the PRSEUS pressure cube test article. The pressure cube was required to withstand a 2P, 18.4 psi, overpressure load requirement. The pristine pressure cube was tested to 2.2P with no catastrophic failure. After the addition of barely visible impact damage, the cube was pressure loaded to 48 psi where catastrophic failure occurred, meeting the scale-up requirement. Comparison of pretest and posttest analyses with the cube test response agree well, and indicate that current analysis methods can be used to accurately analyze PRSEUS structure for initial failure response.

  16. The predictive value of the sacral base pressure test in detecting specific types of sacroiliac dysfunction

    PubMed Central

    Mitchell, Travis D.; Urli, Kristina E.; Breitenbach, Jacques; Yelverton, Chris

    2007-01-01

    Abstract Objective This study aimed to evaluate the validity of the sacral base pressure test in diagnosing sacroiliac joint dysfunction. It also determined the predictive powers of the test in determining which type of sacroiliac joint dysfunction was present. Methods This was a double-blind experimental study with 62 participants. The results from the sacral base pressure test were compared against a cluster of previously validated tests of sacroiliac joint dysfunction to determine its validity and predictive powers. The external rotation of the feet, occurring during the sacral base pressure test, was measured using a digital inclinometer. Results There was no statistically significant difference in the results of the sacral base pressure test between the types of sacroiliac joint dysfunction. In terms of the results of validity, the sacral base pressure test was useful in identifying positive values of sacroiliac joint dysfunction. It was fairly helpful in correctly diagnosing patients with negative test results; however, it had only a “slight” agreement with the diagnosis for κ interpretation. Conclusions In this study, the sacral base pressure test was not a valid test for determining the presence of sacroiliac joint dysfunction or the type of dysfunction present. Further research comparing the agreement of the sacral base pressure test or other sacroiliac joint dysfunction tests with a criterion standard of diagnosis is necessary. PMID:19674694

  17. Quiz: Does Your Blood Pressure Pass the Test? | NIH MedlinePlus the Magazine

    MedlinePlus

    ... page please turn Javascript on. Special Section: Healthy Blood Pressure Quiz: Does Your Blood Pressure Pass the Test? Past Issues / Winter 2010 Table of Contents Blood pressure changes throughout the day. It is highest while ...

  18. Suitport Feasibility - Development and Test of a Suitport and Space Suit for Human Pressurized Space Suit Donning Tests

    NASA Technical Reports Server (NTRS)

    Boyle, Robert M.; Mitchell, Kathryn; Allton, Charles; Ju, Hsing

    2011-01-01

    The suitport concept has been recently implemented as part of the small pressurized lunar rover (Currently the Space Exploration vehicle, or SEV) and the Multi-Mission Space Exploration Vehicle (MMSEV) concept demonstrator vehicle. Suitport replaces or augments the traditional airlock function of a spacecraft by providing a bulkhead opening, capture mechanism, and sealing system to allow ingress and egress of a spacesuit while the spacesuit remains outside of the pressurized volume of the spacecraft. This presents significant new opportunities to EVA exploration in both microgravity and surface environments. The suitport concept will enable three main improvements in EVA by providing reductions in: pre-EVA time from hours to less than thirty minutes; airlock consumables; contamination returned to the cabin with the EVA crewmember. To date, the first generation suitport has been tested with mockup suits on the rover cabins and pressurized on a bench top engineering unit. The work on the rover cabin has helped define the operational concepts and timelines, and has demonstrated the potential of suitport to save significant amounts of crew time before and after EVAs. The work with the engineering unit has successfully demonstrated the pressurizable seal concept including the ability to seal after the introduction and removal of contamination to the sealing surfaces. Using this experience, a second generation suitport was designed. This second generation suitport has been tested with a spacesuit prototype using the pressure differentials of the spacecraft. This test will be performed using the JSC B32 Chamber B, a human rated vacuum chamber. This test will include human rated suitports, the suitport compatible prototype suit, and chamber modifications. This test will bring these three elements together in the first ever pressurized donning of a rear entry suit through a suitport. This paper presents design of a human rated second generation suitport, modifications to

  19. A pressure core ultrasonic test system for on-board analysis of gas hydrate-bearing sediments under in situ pressures.

    PubMed

    Yang, Lei; Zhou, Weihua; Xue, Kaihua; Wei, Rupeng; Ling, Zheng

    2018-05-01

    The enormous potential as an alternative energy resource has made natural gas hydrates a material of intense research interest. Their exploration and sample characterization require a quick and effective analysis of the hydrate-bearing cores recovered under in situ pressures. Here a novel Pressure Core Ultrasonic Test System (PCUTS) for on-board analysis of sediment cores containing gas hydrates at in situ pressures is presented. The PCUTS is designed to be compatible with an on-board pressure core transfer device and a long gravity-piston pressure-retained corer. It provides several advantages over laboratory core analysis including quick and non-destructive detection, in situ and successive acoustic property acquisition, and remission of sample storage and transportation. The design of the unique assembly units to ensure the in situ detection is demonstrated, involving the U-type protecting jackets, transducer precession device, and pressure stabilization system. The in situ P-wave velocity measurements make the detection of gas hydrate existence in the sediments possible on-board. Performance tests have verified the feasibility and sensitivity of the ultrasonic test unit, showing the dependence of P-wave velocity on gas hydrate saturation. The PCUTS has been successfully applied for analysis of natural samples containing gas hydrates recovered from the South China Sea. It is indicated that on-board P-wave measurements could provide a quick and effective understanding of the hydrate occurrence in natural samples, which can assist further resource exploration, assessment, and subsequent detailed core analysis.

  20. A pressure core ultrasonic test system for on-board analysis of gas hydrate-bearing sediments under in situ pressures

    NASA Astrophysics Data System (ADS)

    Yang, Lei; Zhou, Weihua; Xue, Kaihua; Wei, Rupeng; Ling, Zheng

    2018-05-01

    The enormous potential as an alternative energy resource has made natural gas hydrates a material of intense research interest. Their exploration and sample characterization require a quick and effective analysis of the hydrate-bearing cores recovered under in situ pressures. Here a novel Pressure Core Ultrasonic Test System (PCUTS) for on-board analysis of sediment cores containing gas hydrates at in situ pressures is presented. The PCUTS is designed to be compatible with an on-board pressure core transfer device and a long gravity-piston pressure-retained corer. It provides several advantages over laboratory core analysis including quick and non-destructive detection, in situ and successive acoustic property acquisition, and remission of sample storage and transportation. The design of the unique assembly units to ensure the in situ detection is demonstrated, involving the U-type protecting jackets, transducer precession device, and pressure stabilization system. The in situ P-wave velocity measurements make the detection of gas hydrate existence in the sediments possible on-board. Performance tests have verified the feasibility and sensitivity of the ultrasonic test unit, showing the dependence of P-wave velocity on gas hydrate saturation. The PCUTS has been successfully applied for analysis of natural samples containing gas hydrates recovered from the South China Sea. It is indicated that on-board P-wave measurements could provide a quick and effective understanding of the hydrate occurrence in natural samples, which can assist further resource exploration, assessment, and subsequent detailed core analysis.

  1. Interrelationship of Nondestructive Evaluation Methodologies Applied to Testing of Composite Overwrapped Pressure Vessels

    NASA Technical Reports Server (NTRS)

    Leifeste, Mark R.

    2007-01-01

    Composite Overwrapped Pressure Vessels (COPVs) are commonly used in spacecraft for containment of pressurized gases and fluids, incorporating strength and weight savings. The energy stored is capable of extensive spacecraft damage and personal injury in the event of sudden failure. These apparently simple structures, composed of a metallic media impermeable liner and fiber/resin composite overwrap are really complex structures with numerous material and structural phenomena interacting during pressurized use which requires multiple, interrelated monitoring methodologies to monitor and understand subtle changes critical to safe use. Testing of COPVs at NASA Johnson Space Center White Sands T est Facility (WSTF) has employed multiple in-situ, real-time nondestructive evaluation (NDE) methodologies as well as pre- and post-test comparative techniques to monitor changes in material and structural parameters during advanced pressurized testing. The use of NDE methodologies and their relationship to monitoring changes is discussed based on testing of real-world spacecraft COPVs. Lessons learned are used to present recommendations for use in testing, as well as a discussion of potential applications to vessel health monitoring in future applications.

  2. The Safety Course Design and Operations of Composite Overwrapped Pressure Vessels (COPV)

    NASA Technical Reports Server (NTRS)

    Saulsberry, Regor; Prosser, William

    2015-01-01

    Following a Commercial Launch Vehicle On-Pad COPV (Composite Overwrapped Pressure Vessels) failure, a request was received by the NESC (NASA Engineering and Safety Center) June 14, 2014. An assessment was approved July 10, 2014, to develop and assess the capability of scanning eddy current (EC) nondestructive evaluation (NDE) methods for mapping thickness and inspection for flaws. Current methods could not identify thickness reduction from necking and critical flaw detection was not possible with conventional dye penetrant (PT) methods, so sensitive EC scanning techniques were needed. Developmental methods existed, but had not been fully developed, nor had the requisite capability assessment (i.e., a POD (Probability of Detection) study) been performed.

  3. Device for testing closure disks at high rates of change of pressure

    DOEpatents

    Merten, Jr., Charles W.

    1993-11-09

    A device for testing the burst pressure of closure disks which provides high pressure to both sides of a disk and rapidly releases pressure from one side thereof causing a high rate of change of pressure. A hollow notched plug allows the rapid release of pressure upon rupturing. A means is also disclosed for transmitting a tensile load from a piston to a hollow notched plug and for sealing the means for transmitting load within a hole in a piston.

  4. Field Test of the World Health Organization Multi-Professional Patient Safety Curriculum Guide

    PubMed Central

    Farley, Donna; Zheng, Hao; Rousi, Eirini; Leotsakos, Agnès

    2015-01-01

    Introduction Although the importance of training in patient safety has been acknowledged for over a decade, it remains under-utilized and under-valued in most countries. WHO developed the Multi-professional Patient Safety Curriculum Guide to provide schools with the requirements and tools for incorporating patient safety in education. It was field tested with 12 participating schools across the six WHO regions, to assess its effectiveness for teaching patient safety to undergraduate and graduate students in a global variety of settings. Methods The evaluation used a combined prospective/retrospective design to generate formative information on the experiences of working with the Guide and summative information on the impacts of the Guide. Using stakeholder interviews and student surveys, data were gathered from each participating school at three times: the start of the field test (baseline), soon after each school started teaching, and soon after each school finished teaching. Results Stakeholders interviewed were strongly positive about the Guide, noting that it emphasized universally important patient safety topics, was culturally appropriate for their countries, and gave credibility and created a focus on patient safety at their schools. Student perceptions and attitudes regarding patient safety improved substantially during the field test, and their knowledge of the topics they were taught doubled, from 10.7% to 20.8% of correct answers on the student survey. Discussion This evaluation documented the effectiveness of the Curriculum Guide, for both ease of use by schools and its impacts on improving the patient safety knowledge of healthcare students. WHO should be well positioned to refine the contents of the Guide and move forward in encouraging broader use of the Guide globally for teaching patient safety. PMID:26406893

  5. Field Test of the World Health Organization Multi-Professional Patient Safety Curriculum Guide.

    PubMed

    Farley, Donna; Zheng, Hao; Rousi, Eirini; Leotsakos, Agnès

    2015-01-01

    Although the importance of training in patient safety has been acknowledged for over a decade, it remains under-utilized and under-valued in most countries. WHO developed the Multi-professional Patient Safety Curriculum Guide to provide schools with the requirements and tools for incorporating patient safety in education. It was field tested with 12 participating schools across the six WHO regions, to assess its effectiveness for teaching patient safety to undergraduate and graduate students in a global variety of settings. The evaluation used a combined prospective/retrospective design to generate formative information on the experiences of working with the Guide and summative information on the impacts of the Guide. Using stakeholder interviews and student surveys, data were gathered from each participating school at three times: the start of the field test (baseline), soon after each school started teaching, and soon after each school finished teaching. Stakeholders interviewed were strongly positive about the Guide, noting that it emphasized universally important patient safety topics, was culturally appropriate for their countries, and gave credibility and created a focus on patient safety at their schools. Student perceptions and attitudes regarding patient safety improved substantially during the field test, and their knowledge of the topics they were taught doubled, from 10.7% to 20.8% of correct answers on the student survey. This evaluation documented the effectiveness of the Curriculum Guide, for both ease of use by schools and its impacts on improving the patient safety knowledge of healthcare students. WHO should be well positioned to refine the contents of the Guide and move forward in encouraging broader use of the Guide globally for teaching patient safety.

  6. 30 CFR 250.1630 - Safety-system testing and records.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... conditions warrant. Testing must be in accordance with API RP 14C, Appendix D (as incorporated by reference in § 250.198). For safety system devices other than those listed in API RP 14C, Appendix D, you must...

  7. 30 CFR 250.1630 - Safety-system testing and records.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... conditions warrant. Testing must be in accordance with API RP 14C, Appendix D (as incorporated by reference in § 250.198). For safety system devices other than those listed in API RP 14C, Appendix D, you must...

  8. 30 CFR 250.1630 - Safety-system testing and records.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... conditions warrant. Testing must be in accordance with API RP 14C, Appendix D (as incorporated by reference in § 250.198). For safety system devices other than those listed in API RP 14C, Appendix D, you must...

  9. Energy efficient engine low-pressure compressor component test hardware detailed design report

    NASA Technical Reports Server (NTRS)

    Michael, C. J.; Halle, J. E.

    1981-01-01

    The aerodynamic and mechanical design description of the low pressure compressor component of the Energy Efficient Engine were used. The component was designed to meet the requirements of the Flight Propulsion System while maintaining a low cost approach in providing a low pressure compressor design for the Integrated Core/Low Spool test required in the Energy Efficient Engine Program. The resulting low pressure compressor component design meets or exceeds all design goals with the exception of surge margin. In addition, the expense of hardware fabrication for the Integrated Core/Low Spool test has been minimized through the use of existing minor part hardware.

  10. An Electronic Pressure Profile Display system for aeronautic test facilities

    NASA Technical Reports Server (NTRS)

    Woike, Mark R.

    1990-01-01

    The NASA Lewis Research Center has installed an Electronic Pressure Profile Display system. This system provides for the real-time display of pressure readings on high resolution graphics monitors. The Electronic Pressure Profile Display system will replace manometer banks currently used in aeronautic test facilities. The Electronic Pressure Profile Display system consists of an industrial type Digital Pressure Transmitter (DPI) unit which interfaces with a host computer. The host computer collects the pressure data from the DPI unit, converts it into engineering units, and displays the readings on a high resolution graphics monitor in bar graph format. Software was developed to accomplish the above tasks and also draw facility diagrams as background information on the displays. Data transfer between host computer and DPT unit is done with serial communications. Up to 64 channels are displayed with one second update time. This paper describes the system configuration, its features, and its advantages over existing systems.

  11. An electronic pressure profile display system for aeronautic test facilities

    NASA Technical Reports Server (NTRS)

    Woike, Mark R.

    1990-01-01

    The NASA Lewis Research Center has installed an Electronic Pressure Profile Display system. This system provides for the real-time display of pressure readings on high resolution graphics monitors. The Electronic Pressure Profile Display system will replace manometer banks currently used in aeronautic test facilities. The Electronic Pressure Profile Display system consists of an industrial type Digital Pressure Transmitter (DPT) unit which interfaces with a host computer. The host computer collects the pressure data from the DPT unit, converts it into engineering units, and displays the readings on a high resolution graphics monitor in bar graph format. Software was developed to accomplish the above tasks and also draw facility diagrams as background information on the displays. Data transfer between host computer and DPT unit is done with serial communications. Up to 64 channels are displayed with one second update time. This paper describes the system configuration, its features, and its advantages over existing systems.

  12. The role of microbiological testing in systems for assuring the safety of beef.

    PubMed

    Brown, M H; Gill, C O; Hollingsworth, J; Nickelson, R; Seward, S; Sheridan, J J; Stevenson, T; Sumner, J L; Theno, D M; Usborne, W R; Zink, D

    2000-12-05

    The use of microbiological testing in systems for assuring the safety of beef was considered at a meeting arranged by the International Livestock Educational Foundation as part of the International Livestock Congress, TX, USA, during February, 2000. The 11 invited participants from industry and government research organizations concurred in concluding that microbiological testing is necessary for the implementation and maintenance of effective Hazard Analysis Critical Control Point (HACCP) systems, which are the only means of assuring the microbiological safety of beef; that microbiological testing for HACCP purposes must involve the enumeration of indicator organisms rather than the detection of pathogens; that the efficacy of process control should be assessed against performance criteria and food safety objectives that refer to the numbers of indicator organisms in product; that sampling procedures should allow indicator organisms to be enumerated at very low numbers; and that food safety objectives and microbiological criteria are better related to variables, rather than attributes sampling plans.

  13. Evaluation of Agency Non-Code Layered Pressure Vessels (LPVs)

    NASA Technical Reports Server (NTRS)

    Prosser, William H.

    2014-01-01

    In coordination with the Office of Safety and Mission Assurance and the respective Center Pressure System Managers (PSMs), the NASA Engineering and Safety Center (NESC) was requested to formulate a consensus draft proposal for the development of additional testing and analysis methods to establish the technical validity, and any limitation thereof, for the continued safe operation of facility non-code layered pressure vessels. The PSMs from each NASA Center were asked to participate as part of the assessment team by providing, collecting, and reviewing data regarding current operations of these vessels. This report contains the outcome of the assessment and the findings, observations, and NESC recommendations to the Agency and individual NASA Centers.

  14. 30 CFR 250.423 - What are the requirements for pressure testing casing?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations... drilling or other down-hole operations until you obtain a satisfactory pressure test. If the pressure...

  15. Device for testing closure disks at high rates of change of pressure

    DOEpatents

    Merten, C.W. Jr.

    1993-11-09

    A device is described for testing the burst pressure of closure disks which provides high pressure to both sides of a disk and rapidly releases pressure from one side thereof causing a high rate of change of pressure. A hollow notched plug allows the rapid release of pressure upon rupturing. A means is also disclosed for transmitting a tensile load from a piston to a hollow notched plug and for sealing the means for transmitting load within a hole in a piston. 5 figures.

  16. Modified laminar flow biological safety cabinet.

    PubMed

    McGarrity, G J; Coriell, L L

    1974-10-01

    Tests are reported on a modified laminar flow biological safety cabinet in which the return air plenum that conducts air from the work area to the high efficiency particulate air filters is under negative pressure. Freon gas released inside the cabinet could not be detected outside by a freon gas detection method capable of detecting 10(-6) cc/s. When T3 bacteriophage was aerosolized 5 cm outside the front opening in 11 tests, no phage could be detected inside the cabinet with the motor-filter unit in operation. An average of 2.8 x 10(5) plaque-forming units (PFU)/ft(3) (ca. 0.028 m(3)) were detected with the motor-filter unit not in operation, a penetration of 0.0%. Aerosolization 5 cm inside the cabinet yielded an average of 10 PFU/ft(3) outside the cabinet with the motor-filter unit in operation and an average of 4.1 x 10(5) PFU/ft(3) with the motor-filter unit not in operation, a penetration of 0.002%. These values are the same order of effectiveness as the positive-pressure laminar flow biological safety cabinets previously tested. The advantages of the negative-pressure return plenum design include: (i) assurance that if cracks or leaks develop in the plenum it will not lead to discharge of contaminated air into the laboratory; and (ii) the price is lower due to reduced manufacturing costs.

  17. 30 CFR 250.1609 - Pressure testing of casing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Pressure testing of casing. 250.1609 Section 250.1609 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND.... (When oil or gas is not present in the cap rock, the production liner need not be cemented in place...

  18. [Lacidipine efficacy and safety for high blood pressure treatment in pediatric oncohematology].

    PubMed

    Bernard, E; Mialou, V; Dony, A; Garnier, N; Renard, C; Bleyzac, N

    2014-10-01

    In adults, lacidipine seems to have no CYP3A4-inhibiting action. This particular characteristic makes it advantageous when combined with drugs metabolized by CYP3A4, such as cyclosporine. Until now, no data on the efficacy or safety of this calcium antagonist have been available in children. Thirty-nine hypertensive children (age: 0.13-14 years) receiving lacidipine in oncohematology for a mean of 75 days were included in this retrospective study. The causes of high blood pressure were renal tumor (n=7), catecholamine-secreting tumor (n=4), corticoid treatment (n=5), and cyclosporine treatment (n=23). An initial dosage of 0.05 mg/kg/day was sufficient for 41% of the patients. The remaining patients needed to increase the dosage, by steps of 0.03 mg/kg/day, until reaching an average effective dosage of 0.1 mg/kg/day. Lacidipine significantly decreased blood pressure by 30 (±14) mmHg for systolic blood pressure and by 26 (±13) mmHg for diastolic blood pressure. A medication plan with twice-daily administration was not significantly more effective than a single administration per day. Lacidipine was well tolerated, and no toxicity-related withdrawal of treatment occurred. For 22 patients treated with both cyclosporine and lacidipine, renal function was not disturbed over time, suggesting its preservation by lacidipine. No significant increase in cyclosporine blood concentration was detected. Lacidipine seems to be an effective calcium antagonist in pediatric oncohematology, is well tolerated, has a kidney-protector effect and no drug interaction when combined with cyclosporine. Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  19. Fracture Testing of Integral Stiffened Structure

    NASA Technical Reports Server (NTRS)

    Newman, John A.; Smith, Stephen W.; Piascik, Robert S.; Dawicke, David S.; Johnston, William M.; Willard, Scott A.

    2008-01-01

    Laboratory testing was conducted to evaluate safety concerns for integrally-stiffened tanks that were found to have developed cracks during pressurization testing. Cracks occurred at fastener holes where additional stiffeners were attached to the integrally-stiffened tank structure. Tests were conducted to obtain material properties and to reproduce the crack morphologies that were observed in service to help determine if the tanks are safe for operation. Reproducing the cracking modes observed during pressurization testing required a complex loading state involving both a tensile load in the integrally-stiffened structure and a pin-load at a fastener hole.

  20. CERCA LEU fuel assemblies testing in Maria Reactor - safety analysis summary and testing program scope.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pytel, K.; Mieleszczenko, W.; Lechniak, J.

    2010-03-01

    The presented paper contains neutronic and thermal-hydraulic (for steady and unsteady states) calculation results prepared to support annex to Safety Analysis Report for MARIA reactor in order to obtain approval for program of testing low-enriched uranium (LEU) lead test fuel assemblies (LTFA) manufactured by CERCA. This includes presentation of the limits and operational constraints to be in effect during the fuel testing investigations. Also, the scope of testing program (which began in August 2009), including additional measurements and monitoring procedures, is described.

  1. Testing the Effects of Helium Pressurant on Thermodynamic Vent System Performance with Liquid Hydrogen

    NASA Technical Reports Server (NTRS)

    Flachbart, R. H.; Hastings, L. J.; Hedayat, A.; Nelson, S.; Tucker, S.

    2006-01-01

    In support of the development of a zero gravity pressure control capability for liquid hydrogen, testing was conducted at the Marshall Space Flight Center using the Multipurpose Hydrogen Test Bed (MHTB) to evaluate the effects of helium pressurant on the performance of a spray bar thermodynamic vent system (TVS). Fourteen days of testing was performed in August - September 2005, with an ambient heat leak of about 70-80 watts and tank fill levels of 90%, 50%, and 25%. The TVS successfully controlled the tank pressure within a +/- 3.45 kPa (+/- 0.5 psi) band with various helium concentration levels in the ullage. Relative to pressure control with an "all hydrogen" ullage, the helium presence resulted in 10 to 30 per cent longer pressure reduction durations, depending on the fill level, during the mixing/venting phase of the control cycle. Additionally, the automated control cycle was based on mixing alone for pressure reduction until the pressure versus time slope became positive, at which time the Joule-Thomson vent was opened. Testing was also conducted to evaluate thermodynamic venting without the mixer operating, first with liquid then with vapor at the recirculation line inlet. Although ullage stratification was present, the ullage pressure was successfully controlled without the mixer operating. Thus, if vapor surrounded the pump inlet in a reduced gravity situation, the ullage pressure can still be controlled by venting through the TVS Joule Thomson valve and heat exchanger. It was evident that the spray bar configuration, which extends almost the entire length of the tank, enabled significant thermal energy removal from the ullage even without the mixer operating. Details regarding the test setup and procedures are presented in the paper. 1

  2. Energy efficient engine high-pressure turbine component rig performance test report

    NASA Technical Reports Server (NTRS)

    Leach, K. P.

    1983-01-01

    A rig test of the cooled high-pressure turbine component for the Energy Efficient Engine was successfully completed. The principal objective of this test was to substantiate the turbine design point performance as well as determine off-design performance with the interaction of the secondary flow system. The measured efficiency of the cooled turbine component was 88.5 percent, which surpassed the rig design goal of 86.5 percent. The secondary flow system in the turbine performed according to the design intent. Characterization studies showed that secondary flow system performance is insensitive to flow and pressure variations. Overall, this test has demonstrated that a highly-loaded, transonic, single-stage turbine can achieve a high level of operating efficiency.

  3. Safety envelope for load tolerance of structural element design based on multi-stage testing

    DOE PAGES

    Park, Chanyoung; Kim, Nam H.

    2016-09-06

    Structural elements, such as stiffened panels and lap joints, are basic components of aircraft structures. For aircraft structural design, designers select predesigned elements satisfying the design load requirement based on their load-carrying capabilities. Therefore, estimation of safety envelope of structural elements for load tolerances would be a good investment for design purpose. In this article, a method of estimating safety envelope is presented using probabilistic classification, which can estimate a specific level of failure probability under both aleatory and epistemic uncertainties. An important contribution of this article is that the calculation uncertainty is reflected in building a safety envelope usingmore » Gaussian process, and the effect of element test data on reducing the calculation uncertainty is incorporated by updating the Gaussian process model with the element test data. It is shown that even one element test can significantly reduce the calculation uncertainty due to lacking knowledge of actual physics, so that conservativeness in a safety envelope is significantly reduced. The proposed approach was demonstrated with a cantilever beam example, which represents a structural element. The example shows that calculation uncertainty provides about 93% conservativeness against the uncertainty due to a few element tests. As a result, it is shown that even a single element test can increase the load tolerance modeled with the safety envelope by 20%.« less

  4. On testing models for the pressure-strain correlation of turbulence using direct simulations

    NASA Technical Reports Server (NTRS)

    Speziale, Charles G.; Gatski, Thomas B.; Sarkar, Sutanu

    1992-01-01

    Direct simulations of homogeneous turbulence have, in recent years, come into widespread use for the evaluation of models for the pressure-strain correlation of turbulence. While work in this area has been beneficial, the increasingly common practice of testing the slow and rapid parts of these models separately in uniformly strained turbulent flows is shown in this paper to be unsound. For such flows, the decomposition of models for the total pressure-strain correlation into slow and rapid parts is ambiguous. Consequently, when tested in this manner, misleading conclusions can be drawn about the performance of pressure-strain models. This point is amplified by illustrative calculations of homogeneous shear flow where other pitfalls in the evaluation of models are also uncovered. More meaningful measures for testing the performance of pressure-strain models in uniformly strained turbulent flows are proposed and the implications for turbulence modeling are discussed.

  5. Adolescents, gangs, and perceptions of safety, parental engagement, and peer pressure.

    PubMed

    Kelly, Sarah E; Anderson, Debra G

    2012-10-01

    Adolescents are exposed to various forms of gang violence, and such exposure has led them to feel unsafe in their neighborhood and have differing interactions with their parents and peers. This qualitative study explored adolescents', parents', and community center employees' perceptions of adolescents' interaction with their neighborhood, family, and peers. Three themes emerged from the data: Most adolescents reported that the community center provided a safe environment for them; parental engagement influenced adolescents' experiences with gangs; and adolescents were subjected to peer pressure in order to belong. Exposure to gang violence can leave an impression on adolescents and affect their mental health, but neighborhood safety and relationships with parents and peers can influence adolescents' exposure to gang violence. Recommendations regarding the use of health care professionals at community centers are proposed. Copyright 2012, SLACK Incorporated.

  6. Evaluation of Agency Non-Code Layered Pressure Vessels (LPVs) . Volume 2; Appendices

    NASA Technical Reports Server (NTRS)

    Prosser, William H.

    2014-01-01

    In coordination with the Office of Safety and Mission Assurance and the respective Center Pressure System Managers (PSMs), the NASA Engineering and Safety Center (NESC) was requested to formulate a consensus draft proposal for the development of additional testing and analysis methods to establish the technical validity, and any limitation thereof, for the continued safe operation of facility non-code layered pressure vessels. The PSMs from each NASA Center were asked to participate as part of the assessment team by providing, collecting, and reviewing data regarding current operations of these vessels. This document contains the appendices to the main report.

  7. The interplay of parental support, parental pressure and test anxiety--Gender differences in adolescents.

    PubMed

    Ringeisen, Tobias; Raufelder, Diana

    2015-12-01

    This study examined gender-specific relationships between adolescents' perceptions of school-related support/pressure from their parents and test anxiety. A sample of German students (N = 845; Mage = 15.32; SD = .49) completed questionnaires that measured their perceived parental support/pressure (for mother and father separately) as well as the four main components of test anxiety (worry, interference, lack of confidence, and emotionality). Gender-specific relations were identified using multigroup structural equation modeling: For girls, perceived maternal pressure was positively associated with emotionality and interference; for boys, perceived father pressure and father support were positively associated with interference and worry, respectively. For both genders, perceived mother pressure and support were related to lack of confidence. Our findings suggest that adolescents' perceptions of maternal attitudes are associated with students' self-confidence irrespective of the child's gender, whereas the remaining facets of test anxiety follow same-sex trajectories between perceived parental attitudes and adolescents' test anxiety. Copyright © 2015 The Foundation for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.

  8. Safety and Immunogenicity Testing of a Pilot Polysaccharide Vaccine Preparation to Pseudomonas aeruginosa.

    DTIC Science & Technology

    1981-09-01

    8217-NAL." BUR-._,AL)- ’..O,.-,.S.AN--DA. .-D-S.... . . . .A AD___________ Safety and Immunogenicity Testing of a Pilot Polysaccharide Vaccine Preparation...COVERED Safety and Immunogenicity Testing of a Pilot Annual Report Polysaccharide Vaccine Preparation to (16 Aug. 80 - 1 Aug. 81) Pseudomonas...immunogenic or biologically active component of the vaccine. The vaccine is a high molecu- lar weight polysaccharide (PS) material isolated from the outer

  9. Safety compliance and safety climate: A repeated cross-sectional study in the oil and gas industry.

    PubMed

    Kvalheim, Sverre A; Dahl, Øyvind

    2016-12-01

    Violations of safety rules and procedures are commonly identified as a causal factor in accidents in the oil and gas industry. Extensive knowledge on effective management practices related to improved compliance with safety procedures is therefore needed. Previous studies of the causal relationship between safety climate and safety compliance demonstrate that the propensity to act in accordance with prevailing rules and procedures is influenced to a large degree by workers' safety climate. Commonly, the climate measures employed differ from one study to another and identical measures of safety climate are seldom tested repeatedly over extended periods of time. This research gap is addressed in the present study. The study is based on a survey conducted four times among sharp-end workers of the Norwegian oil and gas industry (N=31,350). This is done by performing multiple tests (regression analysis) over a period of 7years of the causal relationship between safety climate and safety compliance. The safety climate measure employed is identical across the 7-year period. Taking all periods together, the employed safety climate model explained roughly 27% of the variance in safety compliance. The causal relationship was found to be stable across the period, thereby increasing the reliability and the predictive validity of the factor structure. The safety climate factor that had the most powerful effect on safety compliance was work pressure. The factor structure employed shows high predictive validity and should therefore be relevant to organizations seeking to improve safety in the petroleum sector. The findings should also be relevant to other high-hazard industries where safety rules and procedures constitute a central part of the approach to managing safety. Copyright © 2016 Elsevier Ltd and National Safety Council. All rights reserved.

  10. [Non-animal toxicology in the safety testing of chemicals].

    PubMed

    Heinonen, Tuula; Tähti, Hanna

    2013-01-01

    There is an urgent need to develop predictive test methods better than animal experiments for assessing the safety of chemical substances to man. According to today's vision this is achieved by using human cell based tissue and organ models. In the new testing strategy the toxic effects are assessed by the changes in the critical parameters of the cellular biochemical routes (AOP, adverse toxic outcome pathway-principle) in the target tissues. In vitro-tests are rapid and effective, and with them automation can be applied. The change in the testing paradigm is supported by all stakeholders: scientists, regulators and people concerned on animal welfare.

  11. Simulation and test of the thermal behavior of pressure switch

    NASA Astrophysics Data System (ADS)

    Liu, Yifang; Chen, Daner; Zhang, Yao; Dai, Tingting

    2018-04-01

    Little, lightweight, low-power microelectromechanical system (MEMS) pressure switches offer a good development prospect for small, ultra-long, simple atmosphere environments. In order to realize MEMS pressure switch, it is necessary to solve one of the key technologies such as thermal robust optimization. The finite element simulation software is used to analyze the thermal behavior of the pressure switch and the deformation law of the pressure switch film under different temperature. The thermal stress releasing schemes are studied by changing the structure of fixed form and changing the thickness of the substrate, respectively. Finally, the design of the glass substrate thickness of 2.5 mm is used to ensure that the maximum equivalent stress is reduced to a quarter of the original value, only 154 MPa when the structure is in extreme temperature (80∘C). The test results show that after the pressure switch is thermally optimized, the upper and lower electrodes can be reliably contacted to accommodate different operating temperature environments.

  12. 33 CFR 159.129 - Safety: Ignition prevention test.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... chamber filled with a rich mixture of gasoline or propane in air with the pressure being varied from 0 to... certified as being intrinsically safe in accordance with the Instrument Society of America (RP 12.2) or... locations (46 CFR 111.80-5(a)) need not be subjected to this testing. ...

  13. 33 CFR 159.129 - Safety: Ignition prevention test.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... chamber filled with a rich mixture of gasoline or propane in air with the pressure being varied from 0 to... certified as being intrinsically safe in accordance with the Instrument Society of America (RP 12.2) or... locations (46 CFR 111.80-5(a)) need not be subjected to this testing. ...

  14. 33 CFR 159.129 - Safety: Ignition prevention test.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... chamber filled with a rich mixture of gasoline or propane in air with the pressure being varied from 0 to... certified as being intrinsically safe in accordance with the Instrument Society of America (RP 12.2) or... locations (46 CFR 111.80-5(a)) need not be subjected to this testing. ...

  15. Flooding Experiments and Modeling for Improved Reactor Safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solmos, M.; Hogan, K. J.; Vierow, K.

    2008-09-14

    Countercurrent two-phase flow and “flooding” phenomena in light water reactor systems are being investigated experimentally and analytically to improve reactor safety of current and future reactors. The aspects that will be better clarified are the effects of condensation and tube inclination on flooding in large diameter tubes. The current project aims to improve the level of understanding of flooding mechanisms and to develop an analysis model for more accurate evaluations of flooding in the pressurizer surge line of a Pressurized Water Reactor (PWR). Interest in flooding has recently increased because Countercurrent Flow Limitation (CCFL) in the AP600 pressurizer surge linemore » can affect the vessel refill rate following a small break LOCA and because analysis of hypothetical severe accidents with the current flooding models in reactor safety codes shows that these models represent the largest uncertainty in analysis of steam generator tube creep rupture. During a hypothetical station blackout without auxiliary feedwater recovery, should the hot leg become voided, the pressurizer liquid will drain to the hot leg and flooding may occur in the surge line. The flooding model heavily influences the pressurizer emptying rate and the potential for surge line structural failure due to overheating and creep rupture. The air-water test results in vertical tubes are presented in this paper along with a semi-empirical correlation for the onset of flooding. The unique aspects of the study include careful experimentation on large-diameter tubes and an integrated program in which air-water testing provides benchmark knowledge and visualization data from which to conduct steam-water testing.« less

  16. Solar Thermal Upper Stage Liquid Hydrogen Pressure Control Testing

    NASA Technical Reports Server (NTRS)

    Moore, J. D.; Otto, J. M.; Cody, J. C.; Hastings, L. J.; Bryant, C. B.; Gautney, T. T.

    2015-01-01

    High-energy cryogenic propellant is an essential element in future space exploration programs. Therefore, NASA and its industrial partners are committed to an advanced development/technology program that will broaden the experience base for the entire cryogenic fluid management community. Furthermore, the high cost of microgravity experiments has motivated NASA to establish government/aerospace industry teams to aggressively explore combinations of ground testing and analytical modeling to the greatest extent possible, thereby benefitting both industry and government entities. One such team consisting of ManTech SRS, Inc., Edwards Air Force Base, and Marshall Space Flight Center (MSFC) was formed to pursue a technology project designed to demonstrate technology readiness for an SRS liquid hydrogen (LH2) in-space propellant management concept. The subject testing was cooperatively performed June 21-30, 2000, through a partially reimbursable Space Act Agreement between SRS, MSFC, and the Air Force Research Laboratory. The joint statement of work used to guide the technical activity is presented in appendix A. The key elements of the SRS concept consisted of an LH2 storage and supply system that used all of the vented H2 for solar engine thrusting, accommodated pressure control without a thermodynamic vent system (TVS), and minimized or eliminated the need for a capillary liquid acquisition device (LAD). The strategy was to balance the LH2 storage tank pressure control requirements with the engine thrusting requirements to selectively provide either liquid or vapor H2 at a controlled rate to a solar thermal engine in the low-gravity environment of space operations. The overall test objective was to verify that the proposed concept could enable simultaneous control of LH2 tank pressure and feed system flow to the thruster without necessitating a TVS and a capillary LAD. The primary program objectives were designed to demonstrate technology readiness of the SRS concept

  17. Radioisotopic cardiac pacemaker report on safety tests: crush, internal pressure, cremation; Stimulateur cardiaque radioisotopique. Essais de securite (ecrasement, pression interne, incineration) (in French)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carrard, C.; Milet, C.

    1973-03-15

    Following the results presented at the Second International Symposium on Power from Radioisotopes [Madrid, 29th May-1st June 1973] the present report describes the various tests: crush and internal pressures resistance of the radioisotopic sources as well as cremation at 1300 deg C (3370 deg F) performed on the sources, the thermoelectric batteries and the whole cardiac pacemaker.

  18. The efficacy and safety of whole-body electromyostimulation in applying to human body: based from graded exercise test.

    PubMed

    Jee, Yong-Seok

    2018-02-01

    Recently, whole body-electromyostimulation (WB-EMS) has upgraded its functions and capabilities and has overcome limitations and inconveniences from past systems. Although the efficacy and safety of EMS have been examined in some studies, specific guidelines for applying WB-EMS are lacking. To determine the efficacy and safety of applying it in healthy men to improve cardiopulmonary and psychophysiological variables when applying WB-EMS. Sixty-four participants were randomly grouped into control group (without electrical stimuli) or WB-EMS group after a 6-week baseline period. The control group (n=33; female. 15; male, 18) wore the WB-EMS suit as much as the WB-EMS group (n=31; female, 15; male, 16). There were no abnormal changes in the cardiopulmonary variables (heart rate, systolic blood pressure [SBP], diastolic blood pressure, and oxygen uptake) during or after the graded exercise test (GXT) in both groups. There was a significant decrease in SBP and an increase of oxygen uptake from stages 3 to 5 of the GXT in the WB-EMS group. The psychophysiological factors for a WB-EMS group, which consisted of soreness, anxiety, fatigability, and sleeplessness were significantly decreased after the experiment. The application of WB-EMS in healthy young men did not negatively affect the cardiopulmonary and psychophysiological factors. Rather, the application of WB-EMS improved SBP and oxygen uptake in submaximal and maximal stages of GXT. This study also confirmed that 6 weeks of WB-EMS training can improve psychophysiological factors.

  19. Test description and preliminary pitot-pressure surveys for Langley Test Technique Demonstrator at Mach 6

    NASA Technical Reports Server (NTRS)

    Everhart, Joel L.; Ashby, George C., Jr.; Monta, William J.

    1992-01-01

    A propulsion/airframe integration experiment conducted in the NASA Langley 20-Inch Mach 6 Tunnel using a 16.8-in.-long version of the Langley Test Technique Demonstrator configuration with simulated scramjet propulsion is described. Schlieren and vapor screen visualization of the nozzle flow field is presented and correlated with pitot-pressure flow-field surveys. The data were obtained at nominal free-stream conditions of Re = 2.8 x 10 exp 6 and a nominal engine total pressure of 100 psia. It is concluded that pitot-pressure surveys coupled to schlieren and vapor-screen photographs, and oil flows have revealed flow features including vortices, free shear layers, and shock waves occurring in the model flow field.

  20. Study of stator-vane fluctuating pressures in a turbofan engine for static and flight tests

    NASA Technical Reports Server (NTRS)

    Mueller, A. W.

    1984-01-01

    As part of a program to study the fan noise generated from turbofan engines, fluctuating surface pressures induced by fan-rotor wakes were measured on core- and bypass-stator outlet guide vanes of a modified JT15D-1 engine. Tests were conducted with the engine operating on an outdoor test stand and in flight. The amplitudes of pressures measured at fan-rotor blade-passage fundamental frequencies were generally higher and appeared less stable for the static tests than for the flight tests. Fluctuating pressures measured at the blade-passage frequency of the high-speed core compressor were interpreted to be acoustic; however, disturbance trace velocities for either the convected rotor wakes or acoustic pressures were difficult to interpret because of the complex environment.

  1. Pressure-release versus rigid reflector for extracorporeal shockwave lithotripsy.

    PubMed

    Loske, Achim M; Prieto, Fernando E

    2002-06-01

    To evaluate the advantages and disadvantages of using a pressure-release reflector instead of a rigid reflector to concentrate shockwaves for extracorporeal shockwave lithotripsy (SWL). As in all electrohydraulic lithotripters, shockwaves were generated by electrical breakdown of water between two electrodes, located at the focus (F1) closest to a paraellipsoidal reflector. A pressure-release reflector, made out of polyurethane foam, was constructed and tested on a research lithotripter using kidney stone models. Fragmentation data and pressure measurements were compared with those of a conventional rigid reflector tested on the same device. The weight of stone model fragments remaining after shockwave exposure was less with the pressure-release reflector after screening through a 3.0 x 3.0-mm mesh. The residual fragment weight was less with the rigid reflector using 1.0 x 1.0- and 0.6 x 0.6-mm meshes. Pressure-release reflectors may maintain acceptable stone fragmentation while offering improved patient safety and should be considered for SWL.

  2. 76 FR 20672 - Recommendations on In Vitro Ocular Safety Testing Methods and Strategies and Routine Use of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... certain regulatory testing purposes without the need for animal testing. The Organisation for Economic Co... DEPARTMENT OF HEALTH AND HUMAN SERVICES Recommendations on In Vitro Ocular Safety Testing Methods... Ocular Safety Testing AGENCY: National Institute of Environmental Health Sciences (NIEHS), National...

  3. Study of the post-derailment safety measures on low-speed derailment tests

    NASA Astrophysics Data System (ADS)

    Guo, Lirong; Wang, Kaiyun; Lin, Jianhui; Zhang, Bing; Chen, Zaigang; Song, Xinwu; Du, Gaofeng

    2016-07-01

    Prevention of train from derailment is the most important issue for the railway system. Keeping derailed vehicle close to the track centreline is beneficial to minimise the severe consequences associated with derailments. In this paper, the post-derailment safety measures are studied based on low-speed derailment tests. Post-derailment devices can prevent deviation of the train from the rail by catching the rail, and they are mounted under the axle box. Considering the different structures of vehicles, both trailer and motor vehicles are equipped with the safety device and then separately used in low-speed derailment tests. In derailment tests, two kinds of track, namely the CRTS-I slab ballastless track and the CRTS-II bi-block sleeper ballastless track, are adopted to investigate the effect of the track types on the derailment. In addition, the derailment speed and the weight of the derailed vehicle are also taken into account in derailment tests. The test results indicate that the post-derailment movement of the vehicle includes running and bounce. Reducing the derailment speed and increasing the weight of the head of the train are helpful to reduce the possibility for derailments. For the CRTS-I slab ballastless track, the safety device can prevent trailer vehicles from deviating from the track centreline. The gearbox plays an important role in controlling the lateral displacement of motor vehicle after a derailment while the safety device contributes less to keep derailed motor vehicles on the track centreline. The lateral distance between the safety device and rails should be larger than 181.5 mm for protecting the fasteners system. And for the CRTS-II bi-block sleeper ballastless track, it helps to decrease the post-derailment distance due to the longitudinal impacts with sleepers. It can also restrict the lateral movement of derailed vehicle due to the high shoulders. The results suggest that, CRTS-II bi-block sleeper ballastless track should be widely used

  4. Evaluation of the operator protection factors offered by positive pressure air suits against airborne microbiological challenge.

    PubMed

    Steward, Jackie A; Lever, Mark S

    2012-08-01

    Laboratories throughout the world that perform work with Risk Group 4 Pathogens generally adopt one of two approaches within BSL-4 environments: either the use of positive pressure air-fed suits or using Class III microbiological safety cabinets and isolators for animal work. Within the UK at present, all laboratories working with Risk Group 4 agents adopt the use of Class III microbiological safety cabinet lines and isolators. Operator protection factors for the use of microbiological safety cabinets and isolators are available however; there is limited published data on the operator protection factors afforded by the use of positive pressure suits. This study evaluated the operator protection factors provided by positive pressure air suits against a realistic airborne microbiological challenge. The suits were tested, both intact and with their integrity compromised, on an animated mannequin within a stainless steel exposure chamber. The suits gave operator protection in all tests with an intact suit and with a cut in the leg. When compromised by a cut in the glove, a very small ingress of the challenge was seen as far as the wrist. This is likely to be due to the low airflow in the gloves of the suit. In all cases no microbiological penetration of the respiratory tract was observed. These data provide evidence on which to base safety protocols for use of positive pressure suits within high containment laboratories.

  5. Ares I Scale Model Acoustic Tests Instrumentation for Acoustic and Pressure Measurements

    NASA Technical Reports Server (NTRS)

    Vargas, Magda B.; Counter, Douglas D.

    2011-01-01

    The Ares I Scale Model Acoustic Test (ASMAT) was a development test performed at the Marshall Space Flight Center (MSFC) East Test Area (ETA) Test Stand 116. The test article included a 5% scale Ares I vehicle model and tower mounted on the Mobile Launcher. Acoustic and pressure data were measured by approximately 200 instruments located throughout the test article. There were four primary ASMAT instrument suites: ignition overpressure (IOP), lift-off acoustics (LOA), ground acoustics (GA), and spatial correlation (SC). Each instrumentation suite incorporated different sensor models which were selected based upon measurement requirements. These requirements included the type of measurement, exposure to the environment, instrumentation check-outs and data acquisition. The sensors were attached to the test article using different mounts and brackets dependent upon the location of the sensor. This presentation addresses the observed effect of the sensors and mounts on the acoustic and pressure measurements.

  6. 78 FR 64027 - Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...The U.S. Nuclear Regulatory Commission (NRC) is issuing a revision to regulatory guide (RG), 1.79, ``Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors.'' This RG is being revised to incorporate guidance for preoperational testing of new pressurized water reactor (PWR) designs.

  7. Moving Model Test of High-Speed Train Aerodynamic Drag Based on Stagnation Pressure Measurements

    PubMed Central

    Yang, Mingzhi; Du, Juntao; Huang, Sha; Zhou, Dan

    2017-01-01

    A moving model test method based on stagnation pressure measurements is proposed to measure the train aerodynamic drag coefficient. Because the front tip of a high-speed train has a high pressure area and because a stagnation point occurs in the center of this region, the pressure of the stagnation point is equal to the dynamic pressure of the sensor tube based on the obtained train velocity. The first derivation of the train velocity is taken to calculate the acceleration of the train model ejected by the moving model system without additional power. According to Newton’s second law, the aerodynamic drag coefficient can be resolved through many tests at different train speeds selected within a relatively narrow range. Comparisons are conducted with wind tunnel tests and numerical simulations, and good agreement is obtained, with differences of less than 6.1%. Therefore, the moving model test method proposed in this paper is feasible and reliable. PMID:28095441

  8. Making work safer: testing a model of social exchange and safety management.

    PubMed

    DeJoy, David M; Della, Lindsay J; Vandenberg, Robert J; Wilson, Mark G

    2010-04-01

    This study tests a conceptual model that focuses on social exchange in the context of safety management. The model hypothesizes that supportive safety policies and programs should impact both safety climate and organizational commitment. Further, perceived organizational support is predicted to partially mediate both of these relationships. Study outcomes included traditional outcomes for both organizational commitment (e.g., withdrawal behaviors) as well as safety climate (e.g., self-reported work accidents). Questionnaire responses were obtained from 1,723 employees of a large national retailer. Using structural equation modeling (SEM) techniques, all of the model's hypothesized relationships were statistically significant and in the expected directions. The results are discussed in terms of social exchange in organizations and research on safety climate. Maximizing safety is a social-technical enterprise. Expectations related to social exchange and reciprocity figure prominently in creating a positive climate for safety within the organization. Copyright 2010 Elsevier Ltd. All rights reserved.

  9. PIE on Safety-Tested AGR-1 Compact 5-1-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunn, John D.; Morris, Robert Noel; Baldwin, Charles A.

    Post-irradiation examination (PIE) is being performed in support of tristructural isotropic (TRISO) coated particle fuel development and qualification for High-Temperature Gas-cooled Reactors (HTGRs). AGR-1 was the first in a series of TRISO fuel irradiation experiments initiated in 2006 under the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program; this work continues to be funded by the Department of Energy's Office of Nuclear Energy as part of the Advanced Reactor Technologies (ART) initiative. AGR-1 fuel compacts were fabricated at Oak Ridge National Laboratory (ORNL) in 2006 and irradiated for three years in the Idaho National Laboratory (INL) Advanced Test Reactormore » (ATR) to demonstrate and evaluate fuel performance under HTGR irradiation conditions. PIE is being performed at INL and ORNL to study how the fuel behaved during irradiation, and to examine fuel performance during exposure to elevated temperatures at or above temperatures that could occur during a depressurized conduction cooldown event. This report summarizes safety testing of irradiated AGR-1 Compact 5-1-1 in the ORNL Core Conduction Cooldown Test Facility (CCCTF) and post-safety testing PIE.« less

  10. The Safety of Small Containers for Flammable Fluids.

    ERIC Educational Resources Information Center

    Shanley, Edward S.

    1988-01-01

    Highlights aspects of safety that are unfamiliar to most laypersons and to many chemists as well. Presents findings that may lend themselves to presentation in chemistry classes. Details flammability tests, vapor space hazards, and the special case of gasoline containers. Provides experimental data relating vent area and internal pressure. (CW)

  11. Experimental field test of proposed pedestrian safety messages. Volume 3

    DOT National Transportation Integrated Search

    1983-11-01

    Author's abstract: A detailed re-analysis of available pedestrian accident data was utilized to define three sets of pedestrian safety public information and education (PI&E) Messages. These messages were then produced and field tested. The objective...

  12. Independent Assessment of the Backshell Pressure Field for Mars Entry, Descent, and Landing Instrumentation 2 (MEDLI2)

    NASA Technical Reports Server (NTRS)

    Prince, Jill L.; Shoenenberger, Mark

    2017-01-01

    The Mars Entry, Descent, and Landing Instrumentation 2 (MEDLI2) project requested that the NASA Engineering and Safety Center (NESC) support a ballistic range test to measure backshell pressures on scale models of the Mars 2020 entry capsule. The MEDLI2 project needed the test to provide important dynamic pressure data to help select a backshell pressure port, quantify drag coefficient reconstruction uncertainties, and design the data acquisition hardware. This document contains the outcome of the NESC assessment.

  13. Evaluation of seven in vitro alternatives for ocular safety testing.

    PubMed

    Bruner, L H; Kain, D J; Roberts, D A; Parker, R D

    1991-07-01

    Seven in vitro assays were evaluated to determine if any were useful as screening procedures in ocular safety assessment. Seventeen test materials (chemicals, household cleaners, hand soaps, dishwashing liquids, shampoos, and liquid laundry detergents) were tested in each assay. In vivo ocular irritation scores for the materials were obtained from existing rabbit low volume eye test (LVET) data. The seven assays evaluated included the silicon microphysiometer (SM), luminescent bacteria toxicity test (LBT), neutral red assay (NR), total protein assay (TP), Tetrahymena thermophila motility assay (TTMA), bovine eye/chorioallantoic membrane assay (BE/CAM), and the EYTEX system (ETS). For the seventeen materials used in this study there was a significant correlation between the in vivo irritant potential and in vitro data for all the tests except the EYTEX System (SM, r = -0.87; LBT, r = -0.91; NR, r = -0.85; TTMA, r = 0.78; TP, r = -0.86; ETS, r = 0.29). The irritation classifications provided by the BE/CAM also did not correspond with the actual in vivo irritancy potential of the test materials. The result of this study suggested it may be possible to classify materials into broad irritancy categories with some of the assays. This would allow their use as screens prior to limited in vivo confirmation in the ocular safety assessment process.

  14. 49 CFR 195.303 - Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Pressure Testing § 195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon... 49 Transportation 3 2014-10-01 2014-10-01 false Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines. 195.303 Section 195.303 Transportation Other Regulations...

  15. 49 CFR 195.303 - Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Pressure Testing § 195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon... 49 Transportation 3 2013-10-01 2013-10-01 false Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines. 195.303 Section 195.303 Transportation Other Regulations...

  16. 49 CFR 195.303 - Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Pressure Testing § 195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon... 49 Transportation 3 2012-10-01 2012-10-01 false Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines. 195.303 Section 195.303 Transportation Other Regulations...

  17. NASA Requirements for Ground-Based Pressure Vessels and Pressurized Systems (PVS). Revision C

    NASA Technical Reports Server (NTRS)

    Greulich, Owen Rudolf

    2017-01-01

    The purpose of this document is to ensure the structural integrity of PVS through implementation of a minimum set of requirements for ground-based PVS in accordance with this document, NASA Policy Directive (NPD) 8710.5, NASA Safety Policy for Pressure Vessels and Pressurized Systems, NASA Procedural Requirements (NPR) 8715.3, NASA General Safety Program Requirements, applicable Federal Regulations, and national consensus codes and standards (NCS).

  18. Minnesota urban partnership agreement national evaluation : safety data test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report provides the safety data test plan for the Minnesota Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA projects focus on reducing congestion by employing strat...

  19. Test and assessment method of Automotive Safety Systems (SSB) particularly to monitor traffic incidents

    NASA Astrophysics Data System (ADS)

    Pijanowski, B.; Łukjanow, S.; Burliński, R.

    2016-09-01

    The rapid development of telematics, particularly mobile telephony (GSM), wireless data transmission (GPRS) and satellite positioning (GPS) noticeable in the last decade, resulted in an almost unlimited growth of the possibilities for monitoring of mobile objects. These solutions are already widely used in the so-called “Intelligent Transport Systems” - ITS and affect a significant increase for road safety. The article describes a method of testing and evaluation of Car Safety Systems (Polish abbreviation - SSB) especially for monitoring traffic incidents, such as collisions and accidents. The algorithm of SSB testing process is also presented. Tests are performed on the dynamic test bench, part of which is movable platform with car security system mounted on it. Crash tests with a rigid obstacle are carried out instead of destructive attempts to crash test of the entire vehicle which is expensive. The tested system, depending on the simulated traffic conditions, is mounted in such a position and with the use of components, indicated by the manufacturer for the automotive safety system installation in a vehicle, for which it is intended. Then, the tests and assessments are carried out.

  20. PWR-related integral safety experiments in the PKL 111 test facility SBLOCA under beyond-design-basis accident conditions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, P.; Umminger, K.J.; Schoen, B.

    1995-09-01

    The thermal hydraulic behavior of a PWR during beyond-design-basis accident scenarios is of vital interest for the verification and optimization of accident management procedures. Within the scope of the German reactor safety research program experiments were performed in the volumetrically scaled PKL 111 test facility by Siemens/KWU. This highly instrumented test rig simulates a KWU-design PWR (1300 MWe). In particular, the latest tests performed related to a SBLOCA with additional system failures, e.g. nitrogen entering the primary system. In the case of a SBLOCA, it is the goal of the operator to put the plant in a condition where themore » decay heat can be removed first using the low pressure emergency core cooling system and then the residual heat removal system. The experimental investigation presented assumed the following beyond-design-basis accident conditions: 0.5% break in a cold leg, 2 of 4 steam generators (SGs) isolated on the secondary side (feedwater- and steam line-valves closed), filled with steam on the primary side, cooldown of the primary system using the remaining two steam generators, high pressure injection system only in the two loops with intact steam generators, if possible no operator actions to reach the conditions for residual heat removal system activation. Furthermore, it was postulated that 2 of the 4 hot leg accumulators had a reduced initial water inventory (increased nitrogen inventory), allowing nitrogen to enter the primary system at a pressure of 15 bar and nearly preventing the heat transfer in the SGs ({open_quotes}passivating{close_quotes} U-tubes). Due to this the heat transfer regime in the intact steam generators changed remarkably. The primary system showed self-regulating system effects and heat transfer improved again (reflux-condenser mode in the U-tube inlet region).« less

  1. An evaluation of the pressure proof test concept for thin sheet 2024-T3

    NASA Technical Reports Server (NTRS)

    Dawicke, D. S.; Poe, C. C., Jr.; Newman, J. C., Jr.; Harris, C. E.

    1990-01-01

    The concept of pressure proof testing of fuselage structures with fatigue cracks to insure structural integrity was evaluated from a fracture mechanics viewpoint. A generic analytical and experimental investigation was conducted on uniaxially loaded flat panels with crack configurations and stress levels typical of longitudinal lap-splice joints in commercial transport aircraft fuselage. The results revealed that the remaining fatigue life after a proof test was longer than that without the proof test because of crack growth retardation due to increased crack closure. However, based on a crack length that is slightly less than the critical value at the maximum proof test stress, the minimum assured life or proof test interval must be no more than 550 pressure cycles for a 1.33 proof factor and 1530 pressure cycles for a 1.5 proof factor to prevent in-flight failures.

  2. An evaluation of the pressure proof test concept for thin sheet 2024-T3

    NASA Technical Reports Server (NTRS)

    Dawicke, D. S.; Poe, C. C., Jr.; Newman, James C., Jr.; Harris, Charles E.

    1990-01-01

    The concept of pressure proof testing of fuselage structures with fatigue cracks to insure structural integrity was evaluated from a fracture mechanics viewpoint. A generic analytical and experimental investigation was conducted on uniaxially loaded flat panels with crack configurations and stress levels typical of longitudinal lap splice joints in commercial transport aircraft fuselages. The results revealed that the remaining fatigue life after a proof test was longer than that without the proof test because of crack growth retardation due to increased crack closure. However, based on a crack length that is slightly less than the critical value at the maximum proof test stress, the minimum assured life or proof test interval must be no more than 550 pressure cycles for a 1.33 proof factor and 1530 pressure cycles for a 1.5 proof factor to prevent in-flight failures.

  3. Evaluation of World Health Organization Multi-Professional Patient Safety Curriculum Topics in Nursing Education: Pre-test, post-test, none-experimental study.

    PubMed

    Mansour, Mansour; Skull, Alice; Parker, Michael

    2015-01-01

    The Multi-professional Patient Safety Curriculum Guide was launched by the World Health Organization to develop a patient safety-friendly curriculum in health education. The aim of this study was to evaluate the impact of teaching related to two topics from the Patient Safety Curriculum Guide on student nurses' knowledge and attitudes toward patient safety. A pretest, posttest, nonexperimental design was used. Patient safety education questionnaires were distributed to a convenience sample of 181 nursing students before the intervention, and 141 questionnaires after the intervention in one university in the East of England. The intervention consisted of two face-to-face lectures and one facilitated group work discussion. Seventy-one responses from pre- and posttest stages were matched. Paired t test, McNemar's test, and frequency measures were used for data analysis. The findings suggest that there are statistically significant differences in the subscales of the error and patient safety and personal influence over safety. The differences in the students' answers on patient safety knowledge before and after the interventions were not statistically significant. Although the student nurses highly commended the teaching delivered in this study, the use of experimental design in future curriculum evaluation may provide a more complementary insight to the findings of this study. Copyright © 2015 Elsevier Inc. All rights reserved.

  4. 30 CFR 250.1630 - Safety-system testing and records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur... these components, and the following: (1) Safety relief valves on the natural gas feed system for power... level sensors) must be inspected and tested at least once each calendar month, but at no time may more...

  5. Refuge alternatives relief valve testing and design

    PubMed Central

    Lutz, T.J.; Bissert, P.T.; Homce, G.T.; Yonkey, J.A.

    2016-01-01

    The U.S. National Institute for Occupational Safety and Health (NIOSH) has been researching refuge alternatives (RAs) since 2007. RAs typically have built-in pressure relief valves (PRVs) to prevent the unit from reaching unsafe pressures. The U.S. Mine Safety and Health Administration requires that these valves vent the chamber at a maximum pressure of 1.25 kPa (0.18 psi, 5.0 in. H2O), or as specified by the manufacturer, above mine atmospheric pressure in the RA. To facilitate PRV testing, an instrumented benchtop test fixture was developed using an off-the-shelf centrifugal blower and ductwork. Relief pressures and flow characteristics were measured for three units: (1) a modified polyvinyl chloride check valve, (2) an off-the-shelf brass/cast-iron butterfly check valve and (3) a commercially available valve that was designed specifically for one manufacturer’s steel prefabricated RAs and had been adapted for use in one mine operator’s built-in-place RA. PRVs used in tent-style RAs were not investigated. The units were tested with different modifications and configurations in order to check compliance with Title 30 Code of Federal Regulations, or 30 CFR, regulations. The commercially available relief valve did not meet the 30 CFR relief pressure specification but may meet the manufacturer’s specification. Alternative valve designs were modified to meet the 30 CFR relief pressure specification, but all valve designs will need further design research to examine survivability in the event of a 103 kPa (15.0 psi) impulse overpressure during a disaster. PMID:28018003

  6. High-pressure thermal sterilization: food safety and food quality of baby food puree.

    PubMed

    Sevenich, Robert; Kleinstueck, Elke; Crews, Colin; Anderson, Warwick; Pye, Celine; Riddellova, Katerina; Hradecky, Jaromir; Moravcova, Eliska; Reineke, Kai; Knorr, Dietrich

    2014-02-01

    The benefits that high-pressure thermal sterilization offers as an emerging technology could be used to produce a better overall food quality. Due to shorter dwell times and lower thermal load applied to the product in comparison to the thermal retorting, lower numbers and quantities of unwanted food processing contaminants (FPCs), for example, furan, acrylamide, HMF, and MCPD-esters could be formed. Two spore strains were used to test the technique; Geobacillus stearothermophilus and Bacillus amyloliquefaciens, over the temperature range 90 to 121 °C at 600 MPa. The treatments were carried out in baby food puree and ACES-buffer. The treatments at 90 and 105 °C showed that G. stearothermophilus is more pressure-sensitive than B. amyloliquefaciens. The formation of FPCs was monitored during the sterilization process and compared to the amounts found in retorted samples of the same food. The amounts of furan could be reduced between 81% to 96% in comparison to retorting for the tested temperature pressure combination even at sterilization conditions of F₀-value in 7 min. © 2014 Institute of Food Technologists®

  7. Testing of state roadside safety systems. Volume I, Technical report

    DOT National Transportation Integrated Search

    1999-04-01

    The purpose of this study is to crash test and evaluate new or modified roadside safety hardware and, where necessary, redesign the devices to improve their impact performance. The three major areas addressed in this study are the impact performance ...

  8. Testing methods of pressure distribution of bra cups on breasts soft tissue

    NASA Astrophysics Data System (ADS)

    Musilova, B.; Nemcokova, R.; Svoboda, M.

    2017-10-01

    Objective of this study is to evaluate testing methods of pressure distribution of bra cups on breasts soft tissue, the system which do not affect the space between the wearer's body surface and bra cups and thus do not influence the geometry of the measured body surface and thus investigate the functional performance of brassieres. Two measuring systems were used for the pressure comfort evaluating: 1) The pressure distribution of a wearing bra during 20 minutes on women's breasts has been directly measured using pressure sensor, a dielectricum which is elastic polyurethane foam bra cups. Twelve points were measured in bra cups. 2) Simultaneously the change of temperature in the same points bra was tested with the help of noncontact system the thermal imager. The results indicate that both of those systems can identify different pressure distribution at different points. The same size of bra designing features bra cups made from the same material and which is define by the help of same standardised body dimensions (bust and underbust) can cause different value of a compression on different shape of a woman´s breast soft tissue.

  9. Cold Helium Pressurization for Liquid Oxygen/Liquid Methane Propulsion Systems: Fully-Integrated Hot-Fire Test Results

    NASA Technical Reports Server (NTRS)

    Morehead, R. L.; Atwell, M. J.; Melcher, J. C.; Hurlbert, E. A.

    2016-01-01

    Hot-fire test demonstrations were successfully conducted using a cold helium pressurization system fully integrated into a liquid oxygen (LOX) / liquid methane (LCH4) propulsion system (Figure 1). Cold helium pressurant storage at near liquid nitrogen (LN2) temperatures (-275 F and colder) and used as a heated tank pressurant provides a substantial density advantage compared to ambient temperature storage. The increased storage density reduces helium pressurant tank size and mass, creating payload increases of 35% for small lunar-lander sized applications. This degree of mass reduction also enables pressure-fed propulsion systems for human-rated Mars ascent vehicle designs. Hot-fire test results from the highly-instrumented test bed will be used to demonstrate system performance and validate integrated models of the helium and propulsion systems. A pressurization performance metric will also be developed as a means to compare different active pressurization schemes.

  10. Pure Niobium as a Pressure Vessel Material

    NASA Astrophysics Data System (ADS)

    Peterson, T. J.; Carter, H. F.; Foley, M. H.; Klebaner, A. L.; Nicol, T. H.; Page, T. M.; Theilacker, J. C.; Wands, R. H.; Wong-Squires, M. L.; Wu, G.

    2010-04-01

    Physics laboratories around the world are developing niobium superconducting radio frequency (SRF) cavities for use in particle accelerators. These SRF cavities are typically cooled to low temperatures by direct contact with a liquid helium bath, resulting in at least part of the helium container being made from pure niobium. In the U.S., the Code of Federal Regulations allows national laboratories to follow national consensus pressure vessel rules or use of alternative rules which provide a level of safety greater than or equal to that afforded by ASME Boiler and Pressure Vessel Code. Thus, while used for its superconducting properties, niobium ends up also being treated as a material for pressure vessels. This report summarizes what we have learned about the use of niobium as a pressure vessel material, with a focus on issues for compliance with pressure vessel codes. We present results of a literature search for mechanical properties and tests results, as well as a review of ASME pressure vessel code requirements and issues.

  11. Pain Management after Laparoscopic Cholecystectomy-A Randomized Prospective Trial of Low Pressure and Standard Pressure Pneumoperitoneum

    PubMed Central

    Singla, Sanjeev; Mittal, Geeta; Raghav; Mittal, Rajinder K

    2014-01-01

    Background: Abdominal pain and shoulder tip pain after laparoscopic cholecystectomy are distressing for the patient. Various causes of this pain are peritoneal stretching and diaphragmatic irritation by high intra-abdominal pressure caused by pneumoperitoneum . We designed a study to compare the post operative pain after laparoscopic cholecystectomy at low pressure (7-8 mm of Hg) and standard pressure technique (12-14 mm of Hg). Aim : To compare the effect of low pressure and standard pressure pneumoperitoneum in post laparoscopic cholecystectomy pain . Further to study the safety of low pressure pneumoperitoneum in laparoscopic cholecystectomy. Settings and Design: A prospective randomised double blind study. Materials and Methods: A prospective randomised double blind study was done in 100 ASA grade I & II patients. They were divided into two groups -50 each. Group A patients underwent laparoscopic cholecystectomy with low pressure pneumoperitoneum (7-8 mm Hg) while group B underwent laparoscopic cholecystectomy with standard pressure pneumoperitoneum (12-13 mm Hg). Both the groups were compared for pain intensity, analgesic requirement and complications. Statistical Analysis: Demographic data and intraoperative complications were analysed using chi-square test. Frequency of pain, intensity of pain and analgesics consumption was compared by applying ANOVA test. Results: Post-operative pain score was significantly less in low pressure group as compared to standard pressure group. Number of patients requiring rescue analgesic doses was more in standard pressure group . This was statistically significant. Also total analgesic consumption was more in standard pressure group. There was no difference in intraoperative complications. Conclusion: This study demonstrates the use of simple expedient of reducing the pressure of pneumoperitoneum to 8 mm results in reduction in both intensity and frequency of post-operative pain and hence early recovery and better outcome

  12. Pain management after laparoscopic cholecystectomy-a randomized prospective trial of low pressure and standard pressure pneumoperitoneum.

    PubMed

    Singla, Sanjeev; Mittal, Geeta; Raghav; Mittal, Rajinder K

    2014-02-01

    Abdominal pain and shoulder tip pain after laparoscopic cholecystectomy are distressing for the patient. Various causes of this pain are peritoneal stretching and diaphragmatic irritation by high intra-abdominal pressure caused by pneumoperitoneum . We designed a study to compare the post operative pain after laparoscopic cholecystectomy at low pressure (7-8 mm of Hg) and standard pressure technique (12-14 mm of Hg). Aim : To compare the effect of low pressure and standard pressure pneumoperitoneum in post laparoscopic cholecystectomy pain . Further to study the safety of low pressure pneumoperitoneum in laparoscopic cholecystectomy. A prospective randomised double blind study. A prospective randomised double blind study was done in 100 ASA grade I & II patients. They were divided into two groups -50 each. Group A patients underwent laparoscopic cholecystectomy with low pressure pneumoperitoneum (7-8 mm Hg) while group B underwent laparoscopic cholecystectomy with standard pressure pneumoperitoneum (12-13 mm Hg). Both the groups were compared for pain intensity, analgesic requirement and complications. Demographic data and intraoperative complications were analysed using chi-square test. Frequency of pain, intensity of pain and analgesics consumption was compared by applying ANOVA test. Post-operative pain score was significantly less in low pressure group as compared to standard pressure group. Number of patients requiring rescue analgesic doses was more in standard pressure group . This was statistically significant. Also total analgesic consumption was more in standard pressure group. There was no difference in intraoperative complications. This study demonstrates the use of simple expedient of reducing the pressure of pneumoperitoneum to 8 mm results in reduction in both intensity and frequency of post-operative pain and hence early recovery and better outcome.This study also shows that low pressure technique is safe with comparable rate of intraoperative

  13. An overview of changes in pressure values of the middle ear using impedance audiometry among diver candidates in a hyperbaric chamber before and after a pressure test

    NASA Astrophysics Data System (ADS)

    Anoraga, J. S.; Bramantyo, B.; Bardosono, S.; Simanungkalit, S. H.; Basiruddin, J.

    2017-08-01

    Impedance audiometry is not yet routinely used in pressure tests, especially in Indonesia. Direct exposure to pressure in a hyperbaric chamber is sometimes without any assessment of the middle ear or the Eustachian tube function (ETF) of ventilation. Impedance audiometry examinations are important to assess ETF ventilation. This study determined the middle ear pressure value changes associated with the ETF (ventilation) of prospective divers. This study included 29 prospective divers aged 20-40 years without conductive hearing loss. All subjects underwent a modified diving impedance audiometry examination both before and after the pressure test in a double-lock hyperbaric chamber. Using the Toynbee maneuver, the values obtained for changes of pressure in the middle ear were significant before and after the pressure test in the right and left ears: p < 0.001 and p = 0.018, respectively. The impedance audiometry examination is necessary for the selection of candidate divers undergoing pressure tests within a hyperbaric chamber.

  14. The NIRIM two-stage light-gas gun: Performance test results

    NASA Astrophysics Data System (ADS)

    Sekine, T.; Tashiro, S.; Kobayashi, T.; Matsumura, T.

    1996-05-01

    A two-stage light-gun has been installed at the NIRIM in order to investigate the high pressure behavior of materials. For operation and safety test, we used helium and carried out performance test shots. Piston velocity in the pump tube and projectile velocity during free flight are measured by means of gas-pressure profile records at fixed locations and x-ray beam cutting method, respectively.

  15. Activation of the E1 Ultra High Pressure Propulsion Test Facility at Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Messer, Bradley; Messer, Elisabeth; Sewell, Dale; Sass, Jared; Lott, Jeff; Dutreix, Lionel, III

    2001-01-01

    After a decade of construction and a year of activation the El Ultra High Pressure Propulsion Test Facility at NASA's Stennis Space Center is fully operational. The El UHP Propulsion Test Facility is a multi-cell, multi-purpose component and engine test facility . The facility is capable of delivering cryogenic propellants at low, high, and ultra high pressures with flow rates ranging from a few pounds per second up to two thousand pounds per second. Facility activation is defined as a series of tasks required to transition between completion of construction and facility operational readiness. Activating the El UHP Propulsion Test Facility involved independent system checkouts, propellant system leak checks, fluid and gas sampling, gaseous system blow downs, pressurization and vent system checkouts, valve stability testing, valve tuning cryogenic cold flows, and functional readiness tests.

  16. Post-Tensioning Duct Air Pressure Testing Effects on Web Cracking

    DOT National Transportation Integrated Search

    2015-01-01

    Nevada Department of Transportation (NDOT) post-tensioned concrete bridges have experienced web cracking near the post-tensioning ducts during the construction process. The ducts were air pressure tested to ensure the duct can successfully be grouted...

  17. Health and Safety Benefits of Small Pressurized Suitport Rovers as EVA Surface Support Vehicles

    NASA Technical Reports Server (NTRS)

    Gernhardt, Michael L.; Abercromby, Andrew F. J.

    2008-01-01

    Pressurized safe-haven providing SPE protection and decompression sickness (DCS) treatment capabilities within 20 mins at all times. Up to 50% reduction in time spent in EVA suits (vs. Unpressurized Rovers) for equal or greater Boots-on-Surface EVA exploration time. Reduces suit-induced trauma and provides improved options for nutrition, hydration, and waste-management. Time spent inside SPR during long translations may be spent performing resistive and cardiovascular exercise. Multiple shorter EVAs versus single 8 hr EVAs increases DCS safety and decreases prebreathe requirements. SPRs also offer many potential operational, engineering and exploration benefits not addressed here.

  18. Pavement testing facility : effects of tire pressure on flexible pavement response performance

    DOT National Transportation Integrated Search

    1989-08-01

    The effects of tire pressure on flexible pavement response and performance were evaluated using data from the first phase of research at the Federal Highway Administration's Pavement Testing Facility. The Accelerated Loading Facility testing machine ...

  19. Natural Gas Vehicle Cylinder Safety, Training and Inspection Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hank Seiff

    2008-12-31

    Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators andmore » training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.« less

  20. Unavoidable Pressure Ulcers: Development and Testing of the Indiana University Health Pressure Ulcer Prevention Inventory.

    PubMed

    Pittman, Joyce; Beeson, Terrie; Terry, Colin; Dillon, Jill; Hampton, Charity; Kerley, Denise; Mosier, Judith; Gumiela, Ellen; Tucker, Jessica

    2016-01-01

    Despite prevention strategies, hospital-acquired pressure ulcers (HAPUs) continue to occur in the acute care setting. The purpose of this study was to develop an operational definition of and an instrument for identifying avoidable/unavoidable HAPUs in the acute care setting. The Indiana University Health Pressure Ulcer Prevention Inventory (PUPI) was developed and psychometric testing was performed. A retrospective pilot study of 31 adult hospitalized patients with an HAPU was conducted using the PUPI. Overall content validity index of 0.99 and individual item content validity index scores (0.9-1.0) demonstrated excellent content validity. Acceptable PUPI criterion validity was demonstrated with no statistically significant differences between wound specialists' and other panel experts' scoring. Construct validity findings were acceptable with no statistically significant differences among avoidable or unavoidable HAPU patients and their Braden Scale total scores. Interrater reliability was acceptable with perfect agreement on the total PUPI score between raters (κ = 1.0; P = .025). Raters were in total agreement 93% (242/260) of the time on all 12 individual PUPI items. No risk factors were found to be significantly associated with unavoidable HAPUs. An operational definition of and an instrument for identifying avoidable/unavoidable HAPUs in the acute care setting were developed and tested. The instrument provides an objective and structured method for identifying avoidable/unavoidable HAPUs. The PUPI provides an additional method that could be used in root-cause analyses and when reporting adverse pressure ulcer events.

  1. Child Passenger Safety: A Pilot Test of a K-6 Curriculum.

    ERIC Educational Resources Information Center

    Li, Livia K.; And Others

    A Car Passenger Safety Curriculum was developed for Grades K-6 and pilot tested in 10 elementary schools. Five schools served as treatment schools, five as comparison schools. The curriculum included materials at K-1, 2-3, and 4-6 grade levels. Observations were made of belt usage by students, and knowledge tests were administered to students…

  2. Cushion System for Multi-Use Child Safety Seat

    NASA Technical Reports Server (NTRS)

    Dabney, Richard W. (Inventor); Elrod, Susan V. (Inventor)

    2007-01-01

    A cushion system for use with a child safety seat has a plurality of bladders assembled to form a seat cushion that cooperates with the seat's safety harness. One or more sensors coupled to the safety harness sense tension therein and generate a signal indicative of the tension. Each of the bladders is individually pressurized by a pressurization system to define a support configuration of the seat cushion. The pressurization system is disabled when tension in the safety harness has attained a threshold level.

  3. Cushion system for multi-use child safety seat

    NASA Technical Reports Server (NTRS)

    Elrod, Susan V. (Inventor); Dabney, Richard W. (Inventor)

    2007-01-01

    A cushion system for use with a child safety seat has a plurality of bladders assembled to form a seat cushion that cooperates with the seat's safety harness. One or more sensors coupled to the safety harness sense tension therein and generate a signal indicative of the tension. Each of the bladders is individually pressurized by a pressurization system to define a support configuration of the seat cushion. The pressurization system is disabled when tension in the safety harness has attained a threshold level.

  4. System interface for an integrated intelligent safety system (ISS) for vehicle applications.

    PubMed

    Hannan, Mahammad A; Hussain, Aini; Samad, Salina A

    2010-01-01

    This paper deals with the interface-relevant activity of a vehicle integrated intelligent safety system (ISS) that includes an airbag deployment decision system (ADDS) and a tire pressure monitoring system (TPMS). A program is developed in LabWindows/CVI, using C for prototype implementation. The prototype is primarily concerned with the interconnection between hardware objects such as a load cell, web camera, accelerometer, TPM tire module and receiver module, DAQ card, CPU card and a touch screen. Several safety subsystems, including image processing, weight sensing and crash detection systems, are integrated, and their outputs are combined to yield intelligent decisions regarding airbag deployment. The integrated safety system also monitors tire pressure and temperature. Testing and experimentation with this ISS suggests that the system is unique, robust, intelligent, and appropriate for in-vehicle applications.

  5. System Interface for an Integrated Intelligent Safety System (ISS) for Vehicle Applications

    PubMed Central

    Hannan, Mahammad A.; Hussain, Aini; Samad, Salina A.

    2010-01-01

    This paper deals with the interface-relevant activity of a vehicle integrated intelligent safety system (ISS) that includes an airbag deployment decision system (ADDS) and a tire pressure monitoring system (TPMS). A program is developed in LabWindows/CVI, using C for prototype implementation. The prototype is primarily concerned with the interconnection between hardware objects such as a load cell, web camera, accelerometer, TPM tire module and receiver module, DAQ card, CPU card and a touch screen. Several safety subsystems, including image processing, weight sensing and crash detection systems, are integrated, and their outputs are combined to yield intelligent decisions regarding airbag deployment. The integrated safety system also monitors tire pressure and temperature. Testing and experimentation with this ISS suggests that the system is unique, robust, intelligent, and appropriate for in-vehicle applications. PMID:22205861

  6. Implementation of a guideline for pressure ulcer prevention in home care: pretest-post-test study.

    PubMed

    Paquay, Louis; Verstraete, Sabine; Wouters, Renild; Buntinx, Frank; Vanderwee, Katrien; Defloor, Tom; Van Gansbeke, Hendrik

    2010-07-01

    To investigate the effect of the implementation of a patient and family education programme for pressure ulcer prevention in an organisation for home care nursing on guideline adherence and on prevalence and severity of pressure ulcers and to examine the determining factors for the application of measures for pressure ulcer prevention. Quality improvement programmes in pressure ulcer prevention are not always successful. Implementation study using a pretest-post-test design. Data were collected in three probability samples. The first post-test data collection was held after six months, the second after 18 months. Statistical analysis was used, comparing the pretest sample and the second post-test sample. After 18 months, the proportion of subjects with adherent measures had increased from 10·4-13·9%, the proportion of subjects with non-adherent measures decreased from 45·7-36·0%, the proportion of subjects without pressure ulcer prevention increased from 43·9-50·1% (p<0·0001, Chi-square test). Sub-analysis revealed that a positive change in guideline adherence was observed principally in the group at risk. Better process-of-care indicators were associated by lower pressure ulcer prevalence and less severe skin lesions. The nurses' judgement of a patient risk status was the most important factor for applying preventive measures. Furthermore, application of pressure ulcer prevention was determined by higher age (from the age category of 70-79 years), higher dependency for the activities of daily living, higher than baseline mobility score and the presence of a pressure ulcer. Guideline adherence in pressure ulcer prevention changed significantly after implementation of the education programme. There might have been inconsistencies in the nurses' risk judgement. Quality of pressure ulcer prevention improved, but several items for improvement remain. Adaptation of risk assessment procedures is needed. © 2010 Blackwell Publishing Ltd.

  7. Cradle-to-Gate Impact Assessment of a High-Pressure Die-Casting Safety-Relevant Automotive Component

    NASA Astrophysics Data System (ADS)

    Cecchel, Silvia; Cornacchia, Giovanna; Panvini, Andrea

    2016-09-01

    The mass of automotive components has a direct influence on several aspects of vehicle performance, including both fuel consumption and tailpipe emissions, but the real environmental benefit has to be evaluated considering the entire life of the products with a proper life cycle assessment. In this context, the present paper analyzes the environmental burden connected to the production of a safety-relevant aluminum high-pressure die-casting component for commercial vehicles (a suspension cross-beam) considering all the phases connected to its manufacture. The focus on aluminum high-pressure die casting reflects the current trend of the industry and its high energy consumption. This work shows a new method that deeply analyzes every single step of the component's production through the implementation of a wide database of primary data collected thanks to collaborations of some automotive supplier companies. This energy analysis shows significant environmental benefits of aluminum recycling.

  8. Cold flow testing of the Space Shuttle Main Engine high pressure fuel turbine model

    NASA Technical Reports Server (NTRS)

    Hudson, Susan T.; Gaddis, Stephen W.; Johnson, P. D.; Boynton, James L.

    1991-01-01

    In order to experimentally determine the performance of the Space Shuttle Main Engine (SSME) High Pressure Fuel Turbopump (HPFTP) turbine, a 'cold' air flow turbine test program was established at NASA's Marshall Space Flight Center. As part of this test program, a baseline test of Rocketdyne's HPFTP turbine has been completed. The turbine performance and turbine diagnostics such as airfoil surface static pressure distributions, static pressure drops through the turbine, and exit swirl angles were investigated at the turbine design point, over its operating range, and at extreme off-design points. The data was compared to pretest predictions with good results. The test data has been used to improve meanline prediction codes and is now being used to validate various three-dimensional codes. The data will also be scaled to engine conditions and used to improve the SSME steady-state performance model.

  9. Safety and feasibility of achieving lower systolic blood pressure goals in persons with type 2 diabetes: the SANDS trial.

    PubMed

    Weir, Matthew R; Yeh, Fawn; Silverman, Angela; Devereux, Richard B; Galloway, James M; Henderson, Jeffrey A; Howard, William J; Russell, Marie; Wilson, Charlton; Ratner, Robert; Sorkin, John; Umans, Jason G; Fleg, Jerome L; Stylianou, Mario; Lee, Elisa; Howard, Barbara V

    2009-10-01

    The Stop Atherosclerosis in Native Diabetics Study (SANDS) was a randomized open-label clinical trial in type 2 diabetics designed to examine the effects of intensive reduction of blood pressure, aggressive vs standard goals (< or =115/75 mm Hg vs < or =130/80 mm Hg), and low-density lipoprotein (LDL) cholesterol on the composite outcome of change in carotid intimal-medial thickness and cardiovascular events. The study demonstrated that in conjunction with a lower LDL cholesterol target of 70 mg/dL, aggressive systolic blood pressure-lowering resulted in a reduction in carotid intimal-medial thickness and left ventricular mass without measurable differences in cardiovascular events. The blood pressure treatment algorithm included renin-angiotensin system blockade, with other agents added if necessary. The authors conclude that both standard and more aggressive systolic blood pressure reduction can be achieved with excellent safety and good tolerability in patients with type 2 diabetes mellitus.

  10. 30 CFR 250.1707 - What are the requirements for blowout preventer system testing, records, and drills?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What are the requirements for blowout preventer system testing, records, and drills? 250.1707 Section 250.1707 Mineral Resources BUREAU OF SAFETY AND..., you must conduct a low-pressure test and a high-pressure test for each component. You must conduct the...

  11. 30 CFR 250.1707 - What are the requirements for blowout preventer system testing, records, and drills?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What are the requirements for blowout preventer system testing, records, and drills? 250.1707 Section 250.1707 Mineral Resources BUREAU OF SAFETY AND..., you must conduct a low-pressure test and a high-pressure test for each component. You must conduct the...

  12. Evaluation of Four Bedside Test Systems for Card Performance, Handling and Safety.

    PubMed

    Giebel, Felix; Picker, Susanne M; Gathof, Birgit S

    2008-01-01

    SUMMARY: OBJECTIVE: Pretransfusion ABO compatibility testing is a simple and required precaution against ABO-incompatible transfusion, which is one of the greatest threats in transfusion medicine. While distinct agglutination is most important for correct test interpretation, protection against infectious diseases and ease of handling are crucial for accurate test performance. Therefore, the aim of this study was to evaluate differences in test card design, handling, and user safety. DESIGN: Four different bedside test cards with pre-applied antibodies were evaluated by 100 medical students using packed red blood cells of different ABO blood groups. Criteria of evaluation were: agglutination, labelling, handling, and safety regarding possible user injuries. Criteria were rated subjectively according to German school notes ranging from 1 = very good to 6 = very bad/insufficient. RESULTS: Overall, all cards received very good/good marks. The ABO blood group was identified correctly in all cases. Three cards (no. 1, no. 3, no. 4) received statistically significant (p < 0.008) prominence (mean values shown) concerning clearness of agglutination (1.7-1.9 vs. 2.4 for no. 2). Systems with dried antibodies (no. 2, no. 4) outmatched the other systems with respect to overall test system performance (2.0 vs. 2.8-2.9), labelling (1.5 vs. 2.2-2.4), handling (1.9-2.0 vs. 2.5), and user safety (2.5 vs. 3.4). Analysis of card self-explanation revealed no remarkable differences. CONCLUSION: Despite good performance of all card systems tested, the best results when including all criteria evaluated were obtained with card no. 4 (particularly concerning clear agglutination), followed by cards no. 2, no. 1, and no. 3.

  13. Liquid oxygen liquid acquisition device bubble point tests with high pressure lox at elevated temperatures

    NASA Astrophysics Data System (ADS)

    Jurns, J. M.; Hartwig, J. W.

    2012-04-01

    When transferring propellant in space, it is most efficient to transfer single phase liquid from a propellant tank to an engine. In earth's gravity field or under acceleration, propellant transfer is fairly simple. However, in low gravity, withdrawing single-phase fluid becomes a challenge. A variety of propellant management devices (PMDs) are used to ensure single-phase flow. One type of PMD, a liquid acquisition device (LAD) takes advantage of capillary flow and surface tension to acquire liquid. The present work reports on testing with liquid oxygen (LOX) at elevated pressures (and thus temperatures) (maximum pressure 1724 kPa and maximum temperature 122 K) as part of NASA's continuing cryogenic LAD development program. These tests evaluate LAD performance for LOX stored in higher pressure vessels that may be used in propellant systems using pressure fed engines. Test data shows a significant drop in LAD bubble point values at higher liquid temperatures, consistent with lower liquid surface tension at those temperatures. Test data also indicates that there are no first order effects of helium solubility in LOX on LAD bubble point prediction. Test results here extend the range of data for LOX fluid conditions, and provide insight into factors affecting predicting LAD bubble point pressures.

  14. Liquid Oxygen Liquid Acquisition Device Bubble Point Tests with High Pressure LOX at Elevated Temperatures

    NASA Technical Reports Server (NTRS)

    Jurns, John M.; Hartwig, Jason W.

    2011-01-01

    When transferring propellant in space, it is most efficient to transfer single phase liquid from a propellant tank to an engine. In earth s gravity field or under acceleration, propellant transfer is fairly simple. However, in low gravity, withdrawing single-phase fluid becomes a challenge. A variety of propellant management devices (PMD) are used to ensure single-phase flow. One type of PMD, a liquid acquisition device (LAD) takes advantage of capillary flow and surface tension to acquire liquid. The present work reports on testing with liquid oxygen (LOX) at elevated pressures (and thus temperatures) (maximum pressure 1724 kPa and maximum temperature 122K) as part of NASA s continuing cryogenic LAD development program. These tests evaluate LAD performance for LOX stored in higher pressure vessels that may be used in propellant systems using pressure fed engines. Test data shows a significant drop in LAD bubble point values at higher liquid temperatures, consistent with lower liquid surface tension at those temperatures. Test data also indicates that there are no first order effects of helium solubility in LOX on LAD bubble point prediction. Test results here extend the range of data for LOX fluid conditions, and provide insight into factors affecting predicting LAD bubble point pressures.

  15. Nonclinical safety testing of biopharmaceuticals--Addressing current challenges of these novel and emerging therapies.

    PubMed

    Brennan, Frank R; Baumann, Andreas; Blaich, Guenter; de Haan, Lolke; Fagg, Rajni; Kiessling, Andrea; Kronenberg, Sven; Locher, Mathias; Milton, Mark; Tibbitts, Jay; Ulrich, Peter; Weir, Lucinda

    2015-10-01

    Non-clinical safety testing of biopharmaceuticals can present significant challenges to human risk assessment with these often innovative and complex drugs. Hot Topics in this field were discussed recently at the 4th Annual European Biosafe General Membership meeting. In this feature article, the presentations and subsequent discussions from the main sessions are summarized. The topics covered include: (i) wanted versus unwanted immune activation, (ii) bi-specific protein scaffolds, (iii) use of Pharmacokinetic (PK)/Pharmacodynamic (PD) data to impact/optimize toxicology study design, (iv) cytokine release and challenges to human translation (v) safety testing of cell and gene therapies including chimeric antigen receptor T (CAR-T) cells and retroviral vectors and (vi) biopharmaceutical development strategies encompassing a range of diverse topics including optimizing entry of monoclonal antibodies (mAbs) into the brain, safety testing of therapeutic vaccines, non-clinical testing of biosimilars, infection in toxicology studies with immunomodulators and challenges to human risk assessment, maternal and infant anti-drug antibody (ADA) development and impact in non-human primate (NHP) developmental toxicity studies, and a summary of an NC3Rs workshop on the future vision for non-clinical safety assessment of biopharmaceuticals. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. Wind Tunnel Tests for Wind Pressure Distribution on Gable Roof Buildings

    PubMed Central

    2013-01-01

    Gable roof buildings are widely used in industrial buildings. Based on wind tunnel tests with rigid models, wind pressure distributions on gable roof buildings with different aspect ratios were measured simultaneously. Some characteristics of the measured wind pressure field on the surfaces of the models were analyzed, including mean wind pressure, fluctuating wind pressure, peak negative wind pressure, and characteristics of proper orthogonal decomposition results of the measured wind pressure field. The results show that extremely high local suctions often occur in the leading edges of longitudinal wall and windward roof, roof corner, and roof ridge which are the severe damaged locations under strong wind. The aspect ratio of building has a certain effect on the mean wind pressure coefficients, and the effect relates to wind attack angle. Compared with experimental results, the region division of roof corner and roof ridge from AIJ2004 is more reasonable than those from CECS102:2002 and MBMA2006.The contributions of the first several eigenvectors to the overall wind pressure distributions become much bigger. The investigation can offer some basic understanding for estimating wind load distribution on gable roof buildings and facilitate wind-resistant design of cladding components and their connections considering wind load path. PMID:24082851

  17. Wind tunnel tests for wind pressure distribution on gable roof buildings.

    PubMed

    Jing, Xiao-kun; Li, Yuan-qi

    2013-01-01

    Gable roof buildings are widely used in industrial buildings. Based on wind tunnel tests with rigid models, wind pressure distributions on gable roof buildings with different aspect ratios were measured simultaneously. Some characteristics of the measured wind pressure field on the surfaces of the models were analyzed, including mean wind pressure, fluctuating wind pressure, peak negative wind pressure, and characteristics of proper orthogonal decomposition results of the measured wind pressure field. The results show that extremely high local suctions often occur in the leading edges of longitudinal wall and windward roof, roof corner, and roof ridge which are the severe damaged locations under strong wind. The aspect ratio of building has a certain effect on the mean wind pressure coefficients, and the effect relates to wind attack angle. Compared with experimental results, the region division of roof corner and roof ridge from AIJ2004 is more reasonable than those from CECS102:2002 and MBMA2006.The contributions of the first several eigenvectors to the overall wind pressure distributions become much bigger. The investigation can offer some basic understanding for estimating wind load distribution on gable roof buildings and facilitate wind-resistant design of cladding components and their connections considering wind load path.

  18. Ultrasonic Nondestructive Evaluation of PRSEUS Pressure Cube Article in Support of Load Test to Failure

    NASA Technical Reports Server (NTRS)

    Johnston, Patrick H.

    2013-01-01

    The PRSEUS Pressure Cube Test was a joint development effort between the Boeing Company and NASA Langley Research Center, sponsored in part by the Environmentally Responsible Aviation Project and Boeing internal R&D. This Technical Memorandum presents the results of ultrasonic inspections in support of the PRSEUS Pressure Cube Test, and is a companion document with the NASA test report and a report on the acoustic emission measurements made during the test.

  19. Computerized Cuff Pressure Algometry as Guidance for Circumferential Tissue Compression for Wearable Soft Robotic Applications: A Systematic Review.

    PubMed

    Kermavnar, Tjaša; Power, Valerie; de Eyto, Adam; O'Sullivan, Leonard W

    2018-02-01

    In this article, we review the literature on quantitative sensory testing of deep somatic pain by means of computerized cuff pressure algometry (CPA) in search of pressure-related safety guidelines for wearable soft exoskeleton and robotics design. Most pressure-related safety thresholds to date are based on interface pressures and skin perfusion, although clinical research suggests the deep somatic tissues to be the most sensitive to excessive loading. With CPA, pain is induced in deeper layers of soft tissue at the limbs. The results indicate that circumferential compression leads to discomfort at ∼16-34 kPa, becomes painful at ∼20-27 kPa, and can become unbearable even below 40 kPa.

  20. Stress Rupture Testing and Analysis of the NASA WSTF-JPL Carbon Overwrapped Pressure Vessels

    NASA Technical Reports Server (NTRS)

    Greene, Nathanael; Yoder, Tommy; Saulsberry, Regor; Grimes, Lorie; Thesken, John; Phoenix, Leigh

    2007-01-01

    Carbon composite overwrapped pressure vessels (COPVs) are widely used in applications from spacecraft to life support. COPV technology provides a pressurized media storage advantage over amorphous technology with weight savings on the order of 30 percent. The National Aeronautics and Space Administration (NASA) has been supporting the development of this technology since the early 1970's with an interest in safe application of these components to reduce mass to orbit. NASA White Sands Test Facility (WSTF) has been testing components in support of this objective since the 1980s and has been involved in test development and analysis to address affects of impact, propellant and cryogenic fluids exposure on Kevlar and carbon epoxy. The focus of this paper is to present results of a recent joint WSTF-Jet Propulsion Laboratories (JPL) effort to assess safe life of these components. The WSTF-JPL test articles consisted of an aluminum liner and a carbon fiber overwrap in an industry standard epoxy resin system. The vessels were specifically designed with one plus-minus helical wrap and one hoop wrap over the helical and they measured 4.23 x 11.4 in. long. 120 test articles were manufactured in August of 1998 of one lot fiber and resin and the 110 test articles were delivered to WSTF for test. Ten of the 120 test articles were burst tested at the manufacturer to establish the delivered fiber stress. Figure 1 shows a test article in a pre burst condition and with a hoop fiber failure (no leak of pressurized media) and post burst (failure of liner and loss of pressurized media).