Sample records for salmon master plan

  1. Hood River Production Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Toole, Patty

    1991-07-01

    The Northwest Power Planning Council's 1987 Columbia River Fish and Wildlife Program authorizes the development of artificial production facilities to raise chinook salmon and steelhead for enhancement in the Hood, Umatilla, Walla Walla, Grande Ronde and Imnaha rivers and elsewhere. On February 26, 1991 the Council agreed to disaggregate Hood River from the Northeast Oregon Hatchery Project, and instead, link the Hood River Master Plan (now the Hood River Production Plan) to the Pelton Ladder Project (Pelton Ladder Master Plan 1991).

  2. 78 FR 28805 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ...) by the Bonneville Power Administration (BPA) for its funding of the Snake River sockeye salmon hatchery program, including modifications to the Springfield Hatchery. Because the BPA action is... submitted HGMP and the Springfield Sockeye Hatchery Master Plan, NMFS proposes to adopt the BPA...

  3. 78 FR 25954 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Act (NEPA) by the Bonneville Power Administration (BPA) for its funding of the Snake River sockeye salmon hatchery program, including modifications to the Springfield Hatchery. Because the BPA action is... submitted HGMP and the Springfield Sockeye Hatchery Master Plan, NMFS proposes to adopt the BPA...

  4. Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M.

    2001-07-01

    The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematicmore » application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.« less

  5. Monitoring and evaluation plan for the Nez Perce Tribal Hatchery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steward, C.R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.« less

  6. Umatilla Basin Natural Production Monitoring and Evaluation; 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwartz, Jesse D.M.; Contor, Craig C.; Hoverson, Eric

    2005-10-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). UBNPMEP is coordinated with two ODFW research projects that also monitor and evaluatemore » the success of the Umatilla Fisheries Restoration Plan. Our project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 19000500, Umatilla Hatchery M & E) and smolt outmigration (project No. 198902401, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects comprehensively monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. Table 1 outlines relationships with other BPA supported projects. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan (ODFW and CTUIR 2004), the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (Schwartz & Cameron Under Revision). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPPC 2004). The need for monitoring the natural production of salmonids in the Umatilla River Basin developed with the efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha) coho salmon and (O. kisutch) and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (BOR 1988). The most notable development was the construction and operation of Three-Mile Falls Dam (3MD) and other irrigation projects that dewatered the Umatilla River during salmon migrations. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and the Oregon Department of Fish and Wildlife (ODFW) developed the Umatilla Hatchery Master Plan to restore the historical fisheries in the basin. The plan was completed in 1990 and included the following objectives: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Produce almost 48,000 adult returns to Three-Mile Falls Dam. The goals were reviewed in 1999 and were changed to 31,500 adult salmon and steelhead returns (Table 2). We conduct core long-term monitoring activities each year as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), genetic monitoring (Currens & Schreck 1995, Narum et al. 2004), and habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998). Our project goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. This is the only project that monitors the restoration of naturally producing salmon and steelhead in the basin.« less

  7. Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik

    The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Peltonmore » Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M&E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O&M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood River subbasin were initially devised based on various assumptions about (1) subbasin carrying capacity, (2) survival rates for selected life history stages, and (3) historic and current escapements of wild, natural, and hatchery stocks of anadromous salmonids to the Hood River subbasin. The Oregon Department of Fish and Wildlife began funding a monitoring and evaluation (M&E) project in December 1991 to collect the quantitative biological information needed to (1) more accurately assess the validity of these assumptions and (2) evaluate the proposed hatchery supplementation component of the HRPP. Bonneville Power Administration assumed funding of the M&E project in August 1992. The M&E project was initially confined to sampling anadromous salmonids escaping to an adult trapping facility operated at Powerdale Dam; which is located at River Mile (RM) 4.5 on the mainstem of the Hood River. Stock specific life history and biological data was collected to (1) monitor subbasin spawner escapements and (2) collect pre-implementation data critical to evaluating the newly proposed HRPP's potential biological impact on indigenous populations of resident fish. The scope of the M&E project was expanded in 1994 to collect the data needed to quantify (1) subbasin smolt production and carrying capacity, (2) smolt to adult survival rates, and (3) the spatial distribution of indigenous populations of summer and winter steelhead, spring and fall chinook salmon, and coho salmon. A creel was incorporated into the M&E project in December 1996 to evaluate the HRPP with respect to its defined subbasin and spawner escapement objectives for Hood River stocks of wild and hatchery summer and winter steelhead and for natural and Deschutes stock hatchery spring chinook salmon. In 1996, the M&E project also began monitoring streamflow at various locations in the Hood River subbasin. Streamflow data will be used to correlate subbasin smolt production with summer streamflows. Data collected from 1991-1999 is reported in the following annual progress reports: Olsen et al. (1994), Olsen et al. (1995), Olsen and French (1996), Olsen et al. (1996), Olsen and French (1999), and Olsen and French (2000). The annual progress reports document information collected on (1) rearing densities of indigenous fish, (2) subbasin steelhead smolt production, (3) post-release survival of acclimated and direct released hatchery summer and winter steelhead smolts, (4) smolt to adult anadromous salmonid survival rates, (5) jack and adult anadromous salmonid escapements and harvest, (6) spatial distribution of adult anadromous salmonid holding in the Hood River subbasin, (7) selected life history patterns and morphological and meristic characteristics of wild, natural, and hatchery resident and anadromous salmonids, and (8) summer streamflows.« less

  8. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and releasedmore » under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild fish, including targeted chinook, non-targeted chinook, and resident species.« less

  9. 77 FR 55191 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... and Threatened Species; Recovery Plans AGENCY: National Marine Fisheries Service (NMFS), National... Species Act (ESA) Recovery Plan for Lower Columbia River Chinook Salmon, Lower Columbia River Coho Salmon, Columbia River Chum Salmon, and Lower Columbia River Steelhead (Proposed Plan) was available for public...

  10. 76 FR 65673 - Fisheries Off West Coast States; West Coast Salmon Fisheries; Amendment 16 to the Salmon Fishery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    .... 101206604-1620-01] RIN 0648-BA55 Fisheries Off West Coast States; West Coast Salmon Fisheries; Amendment 16 to the Salmon Fishery Management Plan AGENCY: National Marine Fisheries Service (NMFS), National... implement Amendment 16 to the Pacific Coast Salmon Fishery Management Plan for Commercial and Recreational...

  11. Salmon habitat assessment for conservation planning in the lower White Salmon River, Washington

    USGS Publications Warehouse

    Hardiman, Jill M.; Allen, M. Brady

    2015-01-01

    In 2011, Condit Dam was removed from the White Salmon River, Washington. Since dam removal, there has been interest among scientists (State and Federal), Tribes, non-profit organizations, and the general public in assessing Pacific salmon habitat and use in the White Salmon River for conservation planning and potential fishery management actions. The study area extended from the lower 6 miles of the White Salmon River to the confluence with the Columbia River, including the former reservoir area. The Mid-Columbia Fisheries Enhancement Group received a grant to initiate efforts to plan for salmon habitat protection in the lower 6 river miles of the White Salmon River. As part of efforts by the Mid-Columbia Fisheries Enhancement Group to conduct conservation planning, the U.S. Geological Survey (USGS) used current and historical habitat information to assist in the planning process. The USGS compiled existing georeferenced habitat data into a Geographic Information System to identify areas of high quality habitat for salmon, potential areas for restoration/improvement, and areas that could be threatened. The primary sources of georeferenced data for this project include a lidar flight contracted by PacifiCorp, bathymetry from USGS, and fall Chinook salmon redd surveys from the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife. Redd observations provided support that the study area is a migratory corridor for salmon and steelhead and that the lowest 2–3 miles had the highest concentration of documented fall Chinook salmon redds. The study area has potential for restoration/conservation areas to improve/conserve salmon habitat.

  12. 77 FR 476 - Endangered and Threatened Species; Recovery Plan Southern Oregon/Northern California Coast Coho...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... and Threatened Species; Recovery Plan Southern Oregon/ Northern California Coast Coho Salmon... Oregon/Northern California Coast (SONCC) Coho Salmon (Oncorhynchus kisutch) Evolutionarily Significant... 95521, Attn: Recovery Coordinator/SONCC Coho Salmon Public Draft Recovery Plan Comments. Hand delivered...

  13. 75 FR 13081 - Endangered and Threatened Species; Notice of Intent to Prepare a Recovery Plan for Central...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... Salmon AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration.... SUMMARY: NMFS announces that the Draft Recovery Plan for Central California Coast coho salmon (Draft Plan... coho salmon (Oncorhynchus kisutch) Evolutionarily Significant Unit (ESU). NMFS is soliciting review and...

  14. 78 FR 38011 - Endangered and Threatened Species; Notice of Intent To Prepare a Recovery Plan for Oregon Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... and Threatened Species; Notice of Intent To Prepare a Recovery Plan for Oregon Coast Coho Salmon... Oregon Coast coho salmon (Oncorhynchus kisutch) Evolutionarily Significant Unit (ESU) (OC coho) and... which can be accessed at http://www.nwr.noaa.gov/protected_species/salmon_steelhead/recovery_planning...

  15. 78 FR 4836 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ...NMFS has evaluated the Tribal Resource Management Plan (Plan) submitted by the Shoshone-Bannock Tribes (Tribes) to NMFS pursuant to the limitation on take prohibitions for actions conducted under the Tribal Rule of section 4(d) for salmon and steelhead promulgated under the Endangered Species Act (ESA). The plan specifies fishery management activities in the Salmon River sub basin of Idaho. This document serves to notify the public that NMFS, by delegated authority from the Secretary of Commerce, has determined pursuant to the ESA Tribal 4(d) Rule for salmon and steelhead that implementing and enforcing the Plan will not appreciably reduce the likelihood of survival and recovery of ESA-listed salmon and steelhead.

  16. 75 FR 7228 - Fisheries of the Exclusive Economic Zone Off Alaska; Chinook Salmon Bycatch Management Measures...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... that combines a limit on the amount of Chinook salmon that may be caught incidentally with an incentive... limit on the amount of Chinook salmon that may be caught incidentally with an incentive plan agreement... arrangement, called an incentive plan agreement (IPA), that establishes an incentive program to minimize...

  17. Gene-expression signatures of Atlantic salmon's plastic life cycle.

    PubMed

    Aubin-Horth, Nadia; Letcher, Benjamin H; Hofmann, Hans A

    2009-09-15

    How genomic expression differs as a function of life history variation is largely unknown. Atlantic salmon exhibits extreme alternative life histories. We defined the gene-expression signatures of wild-caught salmon at two different life stages by comparing the brain expression profiles of mature sneaker males and immature males, and early migrants and late migrants. In addition to life-stage-specific signatures, we discovered a surprisingly large gene set that was differentially regulated-at similar magnitudes, yet in opposite direction-in both life history transitions. We suggest that this co-variation is not a consequence of many independent cellular and molecular switches in the same direction but rather represents the molecular equivalent of a physiological shift orchestrated by one or very few master regulators.

  18. 75 FR 32378 - Fisheries of the Exclusive Economic Zone off Alaska; Chinook Salmon Bycatch Data Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... the Exclusive Economic Zone off Alaska; Chinook Salmon Bycatch Data Collection; Workshop for Industry... Chinook salmon bycatch management program that will be implemented under Amendment 91 to the Fishery... trawl fishery who are knowledgeable about industry plans and operations for avoiding Chinook salmon...

  19. 50 CFR 679.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Alaska. (i) Fishery Management Plan for the Salmon Fisheries in the EEZ off the Coast of Alaska (Salmon FMP). (1) Regulations in this part govern fishing for salmon by fishing vessels of the United States in the Salmon Management Area. (2) State of Alaska laws and regulations that are consistent with the...

  20. Gene-expression signatures of Atlantic salmon's plastic life cycle

    USGS Publications Warehouse

    Aubin-Horth, N.; Letcher, B.H.; Hofmann, H.A.

    2009-01-01

    How genomic expression differs as a function of life history variation is largely unknown. Atlantic salmon exhibits extreme alternative life histories. We defined the gene-expression signatures of wild-caught salmon at two different life stages by comparing the brain expression profiles of mature sneaker males and immature males, and early migrants and late migrants. In addition to life-stage-specific signatures, we discovered a surprisingly large gene set that was differentially regulated-at similar magnitudes, yet in opposite direction-in both life history transitions. We suggest that this co-variation is not a consequence of many independent cellular and molecular switches in the same direction but rather represents the molecular equivalent of a physiological shift orchestrated by one or very few master regulators. ?? 2009 Elsevier Inc. All rights reserved.

  1. Influence of PPB on Capital Budgeting.

    ERIC Educational Resources Information Center

    Ellis, Arthur E.

    This talk is divided into two parts: Part one covers Planning, Programming and Budgeting for Capital Programs. Part two is a brief description of the Coho Salmon Program and how Program Planning and Budgeting in both the operation program and the capital phase was used to develop the Salmon Fishing Industry in Michigan. The planning process…

  2. Salmon recovery planning using the VELMA model

    EPA Science Inventory

    We developed a set of tools to provide decision support for community-based salmon recovery planning in Pacific Northwest watersheds. This seminar describes how these tools are being integrated and applied in collaboration with Puget Sound tribes and community stakeholders to add...

  3. Application of Portfolio Theory in Recovery Planning for Pacific Salmon.

    EPA Science Inventory

    Ecological applications of portfolio theory demonstrate the utility of this analytical framework for understanding the stability of commercial and indigenous Pacific Salmon fisheries. Portfolio theory also has the potential to aid in recovery planning for threatened and endangere...

  4. 76 FR 57945 - Fisheries Off West Coast States; West Coast Salmon Fisheries; Notice of Availability for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ...-BA55 Fisheries Off West Coast States; West Coast Salmon Fisheries; Notice of Availability for Amendment 16 to the Salmon Fishery Management Plan AGENCY: National Marine Fisheries Service (NMFS), National... [[Page 57946

  5. Integrated decision support tools for Puget Sound salmon recovery planning

    EPA Science Inventory

    We developed a set of tools to provide decision support for community-based salmon recovery planning in Salish Sea watersheds. Here we describe how these tools are being integrated and applied in collaboration with Puget Sound tribes and community stakeholders to address restora...

  6. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwestmore » of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate« less

  7. 78 FR 32378 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... proposed adult management program associated with spring Chinook salmon hatchery plans for major... be sent to Allyson Purcell, National Marine Fisheries Services, Salmon Management Division, 1201 N.E... should be directed to the National Marine Fisheries Services, Salmon Management Division, 1201 N.E. Lloyd...

  8. Salmon and steelhead in the White Salmon River after the removal of Condit Dam–Planning efforts and recolonization results

    USGS Publications Warehouse

    Allen, Brady; Engle, Rod O; Zendt, Joseph S; Shrier, Frank C; Wilson, Jeremy T; Connolly, Patrick J.

    2016-01-01

    Condit Dam, at river kilometer 5.3 on the White Salmon River, Washington, was breached in 2011 and completely removed in 2012. This action opened habitat to migratory fish for the first time in 100 years. The White Salmon Working Group was formed to create plans for fish salvage in preparation for fish recolonization and to prescribe the actions necessary to restore anadromous salmonid populations in the White Salmon River after Condit Dam removal. Studies conducted by work group members and others served to inform management decisions. Management options for individual species were considered, including natural recolonization, introduction of a neighboring stock, hatchery supplementation, and monitoring natural recolonization for some time period to assess the need for hatchery supplementation. Monitoring to date indicates that multiple species and stocks of anadromous salmonids are finding and spawning in the now accessible and recovering habitat.

  9. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  10. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  11. Riverscape patterns among years of juvenile coho salmon in midcoastal Oregon: implications for conservation

    Treesearch

    R. Flitcroft; K. Burnett; J. Snyder; G. Reeves; L. Ganio

    2014-01-01

    Patterns of salmon distribution throughout a riverscape may be expected to change over time in response to environmental conditions and population sizes. Changing patterns of use, including identification of consistently occupied locations, are informative for conservation and recovery planning. We explored interannual patterns of distribution by juvenile Coho Salmon...

  12. 76 FR 78243 - Notice of Availability for General Conservation Plans and Notice of Intent To Prepare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... Conservation Plans (GCPs) for the Penobscot Bay, Merrymeeting Bay, and Downeast Coastal Salmon Habitat Recovery... Segment (GOM DPS) of Atlantic salmon (Salmo salar). The GCP will be implemented cooperatively by... survival and recovery of the species in the wild. The impacts of such take must also be minimized and...

  13. A Conceptual Plan for Mitigating Anadromous Fish Losses in the Hanford Reach, Columbia River, Washington.

    DTIC Science & Technology

    1980-10-01

    Oncorhynchus nerka ) An estimated 1.6 million sockeye salmon smolts pass through the Hanford Reach annually. It is expected that up to 240,000 of these smolts...supplementation or ther- mal modification during critical periods, was selected as a production strategy (Figure 2). 2. Chinook Salmon ( Oncorhynchus tshawytscha) a...supplemental heating or warmer groundwater would be necessary. 3. Coho Salmon ( Oncorhynchus kisutch) The hatchery production cycle of coho salmon is similar to

  14. Bi-Annual Report 2010-2011: Shaping pulse flows to meet environmental and energy objectives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jager, Yetta

    2010-10-01

    This report describes a bioenergetic model developed to allocate seasonal pulse flows to benefit salmon growth. The model links flow with floodplain inundation and production of invertebrate prey eaten by juvenile Chinook salmon. A unique quantile modeling approach is used to describe temporal variation among juvenile salmon spawned at different times. Preliminary model outputs are presented and future plans to optimize flows both to maximize salmon growth and hydropower production are outlined.

  15. River food webs: Incorporating nature’s invisible fabric into river management

    Treesearch

    Andrea Watts; Ryan Bellmore; Joseph Benjamin; Colden Baxter

    2018-01-01

    Increasing the population of spring Chinook salmon and summer steelhead in Washington state’s Methow River is a goal of the Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan. Spring Chinook salmon and summer steelhead are listed as endangered and threatened, respectively, under the Endangered Species Act. Installing logjams and...

  16. Listen to Our Salmon: Forests, Rivers and Oceans are Connected.

    ERIC Educational Resources Information Center

    Mueller, Andrea; Brown, Rod

    1998-01-01

    A university-based researcher and a grade seven teacher collaborated to plan a science curriculum that would help elementary school students discover the world of salmon and understand its life cycle. Describes key components of the salmon-enhancement program and river-health project. A student's record of hatching chum fry in the classroom is…

  17. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING..., Application and Modification Procedures § 632.22 Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in...

  18. Northeast Oregon Hatchery Project, Final Siting Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less

  19. Arctic-Yukon-Kuskokwim Salmon Research and Restoration Plan

    USGS Publications Warehouse

    2006-01-01

    The Arctic-Yukon-Kuskokwim Sustainable Salmon Initiative (AYK SSI) is an innovative partnership between public and private institutions which provides a forum for non-governmental organizations and state and federal agencies to cooperatively identify and address salmon research and restoration needs. The affected region encompasses over 40% of the State of Alaska; the AYK region includes the watersheds of the Norton Sound region up to and including the village of Shishmaref, the Yukon River Watershed within Alaska, and the Kuskokwim River Watershed (including the coastal watersheds north of Cape Newenham), plus the Bering Sea marine ecosystem. The AYK SSI is a response to disastrously low salmon returns to western Alaska in the late 1990s and early 2000s, which created numerous hardships for the people and communities that depend heavily on the salmon fishery. Some stocks in the region have been in a decline for more than a decade and a half, leading to severe restrictions on commercial and subsistence fisheries. The first step for the AYK SSI has been to collaboratively develop and implement a comprehensive research plan to understand the causes of the declines and recoveries of AYK salmon.

  20. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 2 2012-01-01 2012-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  1. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 2 2013-01-01 2013-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  2. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  3. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  4. A protocol using coho salmon to monitor Tongass National Forest Land and Resource Management Plan standards and guidelines for fish habitat.

    Treesearch

    M.D. Bryant; Trent McDonald; R. Aho; B.E. Wright; Michelle Bourassa Stahl

    2008-01-01

    We describe a protocol to monitor the effectiveness of the Tongass Land Management Plan (TLMP) management standards for maintaining fish habitat. The protocol uses juvenile coho salmon (Oncorhynchus kisutch) in small tributary streams in forested watersheds. We used a 3-year pilot study to develop detailed methods to estimate juvenile salmonid...

  5. How do we know how many salmon returned to spawn? Implementing the California Coastal salmonid monitoring plan in Mendocino County, California

    Treesearch

    Sean P. Gallagher; David W. Wright

    2012-01-01

    California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...

  6. COLUMBIA RIVER BASIN SALMON AND STEELHEAD: Federal Agencies’ Recovery Responsibilities, Expenditures and Actions

    DTIC Science & Technology

    2002-07-01

    Monthly. Caspian Tern Working Group Developing a plan to reduce smolt predation by Caspian terns nesting in the Columbia River estuary. As needed...Environment and Public Works, U.S. SenateJuly 2002 COLUMBIA RIVER BASIN SALMON AND STEELHEAD Federal Agencies’ Recovery Responsibilities... COLUMBIA RIVER BASIN SALMON AND STEELHEAD: Federal Agencies Recovery Responsibilities, Expenditures and Actions Contract Number Grant Number Program

  7. Rotorcraft master plan

    NASA Technical Reports Server (NTRS)

    Hwoschinsky, Peter V.

    1992-01-01

    The Rotorcraft Master Plan contains a comprehensive summary of active and planned FAA vertical flight research and development. Since the Master Plan is not sufficient for tracking project status and monitoring progress, the Vertical Flight Program Plan will provide that capability. It will be consistent with the Master Plan and, in conjunction with it, will serve to ensure a hospitable environment if the industry presents a practical vertical-flight initiative.

  8. Yavapai College Integrated Master Plan.

    ERIC Educational Resources Information Center

    Yavapai Coll., Prescott, AZ.

    This integrated master plan for Yavapai College (Arizona) includes the following six key components: (1) district services overview; (2) educational services plan; (3) human resources plan; (4) information technology services; (5) facilities plan; and (6) financial plan. The master plan was developed as a result of discussions and meetings with…

  9. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2003-03-01

    This is the third annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2000: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCP). (2) Plan for recovery of endemic summer steelhead populations in Catherinemore » Creek and the upper Grande Ronde River. (3) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (4) Collect summer steelhead. (5) Collect adult endemic spring chinook salmon broodstock. (6) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (7) Document accomplishments and needs to permitters, comanagers, and funding agency. (8) Communicate project results to the scientific community. (9) Plan detailed GRESCP Monitoring and Evaluation for future years. (10) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations and incidentally-caught summer steelhead and bull trout. (11) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (12) Monitor water quality at facilities. (13) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program.« less

  10. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Ogburn, Parker N.

    2003-03-01

    This is the second annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to restore fisheries in these streams. Statement of Work Objectives for 2001: (1) Participate in implementation of the comprehensive multiyear operations plan for the Grande Ronde Endemic Spring chinook Supplementation Program (GRESCP). (2) Plan detailed GRESCP Monitoring and Evaluation for future years. (3)more » Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (4) Plan for data collection needs for bull trout. (5) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2001. (6) Collect summer steelhead. (7) Monitor adult endemic spring chinook salmon populations and collect broodstock. (8) Acclimate juvenile spring chinook salmon prior to release into the upper Grande Ronde River and Catherine Creek. (9) Monitor adult population abundance and characteristics of Grande Ronde River spring chinook salmon populations. (10) Monitor condition, movement, and mortality of spring chinook salmon acclimated at remote facilities. (11) Participate in Monitoring & Evaluation of the captive brood component of the Program to document contribution to the Program. (12) Monitor water quality at facilities. (13) Document accomplishments and needs to permitters, comanagers, and funding agencies. (14) Communicate Project results to the scientific community.« less

  11. Creating Partnerships for a Better Tennessee. Master Plan, 2005-2010

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, 2010

    2010-01-01

    The Tennessee Higher Education Commission is statutorily charged to develop a statewide master plan for the future development of public higher education. In response to this, the Master Plan, "Creating Partnerships for a Better Tennessee," was developed for 2005-2010. The Master Plan is a collaborative effort with the Tennessee Board of…

  12. 20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and/or Master Plan. 632.23 Section 632.23 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... and Modification Procedures § 632.23 Termination and corrective action of a CAP and/or Master Plan. (a) Emergency Termination. The Department may terminate or suspend a CAP designation or Master Plan under...

  13. 20 CFR 632.23 - Termination and corrective action of a CAP and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... and/or Master Plan. 632.23 Section 632.23 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... and Modification Procedures § 632.23 Termination and corrective action of a CAP and/or Master Plan. (a) Emergency Termination. The Department may terminate or suspend a CAP designation or Master Plan under...

  14. Cabrillo College Master Plan, 2001-2004.

    ERIC Educational Resources Information Center

    Cabrillo Coll., Aptos, CA. Office of Institutional Research.

    This document presents Cabrillo College's (California) master plan for 2001 to 2004. Major steps in compiling the master plan included: conducting environmental scanning, making planning assumptions, establishing goals, identifying objectives, developing strategies, and evaluating the plan. The plan is based on six broad goals: (1) to enable…

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swift, Ralph

    Idaho`s Model Watershed Project was established as part of the Northwest Power Planning Council`s plan for salmon recovery in the Columbia River Basin. The Council`s charge was simply stated and came without strings. The tasks were to identify actions within the watershed that are planned or needed for salmon habitat, and establish a procedure for implementing habitat-improvement measures. The Council gave the responsibility of developing this project to the Idaho Soil Conservation Commission. This Model Watershed Plan is intended to be a dynamic plan that helps address these two tasks. It is not intended to be the final say onmore » either. It is also not meant to establish laws, policies, or regulations for the agencies, groups, or individuals who participated in the plan development.« less

  16. Coastal Habitats in Puget Sound: A Research Plan in Support of the Puget Sound Nearshore Partnership

    DTIC Science & Technology

    2006-11-01

    of these are Chinook ( Oncorhynchus tshawytscha), Coho (O. kisutch), chum (O. keta), pink (O. gorbuscha), and sockeye salmon (O. nerka ), anadromous...pink salmon ( Oncorhynchus gorbuscha) embryos. Environmental Science and Technology. 18:494-503. Hood, G. in press. Deepwater slough restoration...Ylitalo, J. Labenia, T. Collier, and N. Scholz. 2003. High rates of pre-spawn mortality in Coho Salmon ( Oncorhynchus kisutch) from urban streams in the

  17. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  18. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  19. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  20. Landscape and Climate Adaptation Planning for the Mashel Watershed

    EPA Science Inventory

    Salmon are important to the economic, social, cultural, and aesthetic values of the people in the Nisqually River. The Mashel watershed is important to recovery of Chinook salmon (Oncorhynchus tshawytscha) and winter steelhead (O. mykiss), and long-term sustainability of coho sal...

  1. Salmon Habitat Modeling Using VELMA

    EPA Science Inventory

    An EPA Western Ecology Division (WED) watershed modeling team has developed a watershed simulation model, VELMA, that state and federal agencies are interested in using for salmon recovery planning in the Pacific Northwest. Team member Bob McKane has been invited to serve on an e...

  2. Gene-expression signatures of Atlantic salmon’s plastic life cycle

    PubMed Central

    Aubin-Horth, Nadia; Letcher, Benjamin H.; Hofmann, Hans A.

    2009-01-01

    How genomic expression differs as a function of life history variation is largely unknown. Atlantic salmon exhibits extreme alternative life histories. We defined the gene-expression signatures of wild-caught salmon at two different life stages by comparing the brain expression profiles of mature sneaker males and immature males, and early migrants and late migrants. In addition to life-stage-specific signatures, we discovered a surprisingly large gene set that was differentially regulated - at similar magnitudes, yet in opposite direction - in both life history transitions. We suggest that this co-variation is not a consequence of many independent cellular and molecular switches in the same direction but rather represents the molecular equivalent of a physiological shift orchestrated by one or very few master regulators. PMID:19401203

  3. Strategic benefits of master facility plans.

    PubMed

    Shannon, K

    1996-02-01

    In recent years, many healthcare executives have stopped developing master facility plans due to some basic misconceptions about them, namely that master facility plans are too rigid or require major capital commitment. By getting past these misconceptions, healthcare executives can help their organizations develop and implement master facility plans that serve as flexible, reliable blueprints in guiding the organizations toward achieving their strategic, operational, and financial goals.

  4. Proactive responses to human impacts that balance development and Atlantic salmon (Salmo salar) conservation: An integrative model

    USGS Publications Warehouse

    Wilzbach, M.A.; Mather, M. E.; Folt, C.L.; Moore, A.; Naiman, R.J.; Youngson, A.F.; McMenemy, J.

    1998-01-01

    Incorporating human impacts into conservation plans is critical to protect natural resources. Using a model that examines how anthropogenic changes might be proactively influenced to promote conservation, we argue that a denser human population does not spell inevitable doom for Atlantic salmon (Salmo salar). Humans affect the Atlantic salmon ecosystem deleteriously through landscape alteration, exploitation, external inputs, and resource competition. An intact ecosystem provides positive feedback to society by providing food, ecosystem services, and improving the quality of life. As Atlantic salmon and associated ecosystem benefits are increasingly valued by society, policies, laws, and regulations that protect salmon populations and habitats are codified into a 'control system' or institutional infrastructure. Via research that helps maintain wild salmon populations and in informing the public about the benefits of a healthy Atlantic salmon ecosystem, scientists can influence public attitudes and facilitate the implementation of environmental policies that moderate harmful anthropogenic changes. Because exchange among scientists is of paramount importance in increasing our understanding of important interrelationships between humans and fish, we recommend the establishment of an international salmon organizational for research.

  5. Strategies for a new age : New York State's transportation master plan for 2030

    DOT National Transportation Integrated Search

    2006-01-01

    Strategies for a New Age: New York States Transportation Master Plan for 2030 is : the States comprehensive statewide transportation master plan and serves as the Federally recognized, : long range transportation plan for the State of New York ...

  6. Sea lice and salmon population dynamics: effects of exposure time for migratory fish.

    PubMed

    Krkosek, Martin; Morton, Alexandra; Volpe, John P; Lewis, Mark A

    2009-08-07

    The ecological impact of parasite transmission from fish farms is probably mediated by the migration of wild fishes, which determines the period of exposure to parasites. For Pacific salmon and the parasitic sea louse, Lepeophtheirus salmonis, analysis of the exposure period may resolve conflicting observations of epizootic mortality in field studies and parasite rejection in experiments. This is because exposure periods can differ by 2-3 orders of magnitude, ranging from months in the field to hours in experiments. We developed a mathematical model of salmon-louse population dynamics, parametrized by a study that monitored naturally infected juvenile salmon held in ocean enclosures. Analysis of replicated trials indicates that lice suffer high mortality, particularly during pre-adult stages. The model suggests louse populations rapidly decline following brief exposure of juvenile salmon, similar to laboratory study designs and data. However, when the exposure period lasts for several weeks, as occurs when juvenile salmon migrate past salmon farms, the model predicts that lice accumulate to abundances that can elevate salmon mortality and depress salmon populations. The duration of parasite exposure is probably critical to salmon-louse population dynamics, and should therefore be accommodated in coastal planning and management where fish farms are situated on wild fish migration routes.

  7. 30. Photocopy of map. Insert, p. 138, Master Plan Report, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photocopy of map. Insert, p. 138, Master Plan Report, 1960, Vol. II. Layton, Layton and Rohrbach, General Planning and Resource Consultants. 1960 MASTER PLAN, SHOWING PROPOSED LOCATION OF LINNAEAN HOUSE - Missouri Botanical Garden, 2345 Tower Grove Avenue, Saint Louis, Independent City, MO

  8. 31. Photocopy of map. Insert from Master Plan Notes Prepared ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photocopy of map. Insert from Master Plan Notes Prepared by Environmental Planning and Design, Pittsburgh, Pa. Original at Missouri Botanical Garden. 1972 MASTER PLAN 32. 'THE TREE,' SCULPTURE BY ALEXANDER CALDER, 1966 - Missouri Botanical Garden, 2345 Tower Grove Avenue, Saint Louis, Independent City, MO

  9. Alabama Environmental Education Master Plan.

    ERIC Educational Resources Information Center

    Alabama Environmental Quality Association, Montgomery.

    This master plan has been designed to involve and guide the citizenry and public officials of Alabama in environmental planning. Environmental awareness is one of the goals of the master plan. The publication is divided into two sections. Part one presents the Alabama environmental education philosophy, major environmental goals, and…

  10. Master Middle Ware: A Tool to Integrate Water Resources and Fish Population Dynamics Models

    NASA Astrophysics Data System (ADS)

    Yi, S.; Sandoval Solis, S.; Thompson, L. C.; Kilduff, D. P.

    2017-12-01

    Linking models that investigate separate components of ecosystem processes has the potential to unify messages regarding management decisions by evaluating potential trade-offs in a cohesive framework. This project aimed to improve the ability of riparian resource managers to forecast future water availability conditions and resultant fish habitat suitability, in order to better inform their management decisions. To accomplish this goal, we developed a middleware tool that is capable of linking and overseeing the operations of two existing models, a water resource planning tool Water Evaluation and Planning (WEAP) model and a habitat-based fish population dynamics model (WEAPhish). First, we designed the Master Middle Ware (MMW) software in Visual Basic for Application® in one Excel® file that provided a familiar framework for both data input and output Second, MMW was used to link and jointly operate WEAP and WEAPhish, using Visual Basic Application (VBA) macros to implement system level calls to run the models. To demonstrate the utility of this approach, hydrological, biological, and middleware model components were developed for the Butte Creek basin. This tributary of the Sacramento River, California is managed for both hydropower and the persistence of a threatened population of spring-run Chinook salmon (Oncorhynchus tschawytscha). While we have demonstrated the use of MMW for a particular watershed and fish population, MMW can be customized for use with different rivers and fish populations, assuming basic data requirements are met. This model integration improves on ad hoc linkages for managing data transfer between software programs by providing a consistent, user-friendly, and familiar interface across different model implementations. Furthermore, the data-viewing capabilities of MMW facilitate the rapid interpretation of model results by hydrologists, fisheries biologists, and resource managers, in order to accelerate learning and management decision making.

  11. Pennsylvania Environmental Education Master Plan. New Direction Across the State... ...For the Total Community.

    ERIC Educational Resources Information Center

    Pennsylvania State Dept. of Environmental Resources, Harrisburg.

    This document is Pennsylvania's master plan for environmental education (EE). It includes: (1) a list of planning principles and guidelines to enhance implementation of the master plan; (2) a flow chart illustrating feasibility, planning, action, and impact phases for the years 1983-85; (3) a summary of major recommendations; (4) a chart…

  12. GCC Master Plan, 1988-89.

    ERIC Educational Resources Information Center

    Germanna Community Coll., Locust Grove, VA.

    In 1989, Germanna Community College (GCC) developed this comprehensive master plan to strengthen its planning process. Part I provides an overview of the development of the master plan, the mission statement of the Virginia Community College System (VCCS), and the mission and purpose statements of GCC. Part II summarizes demographic trends based…

  13. 50 CFR 679.28 - Equipment and operational requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... estimates, vessel monitoring system hardware, catch monitoring and control plan, and catcher vessel... container to store salmon must be located adjacent to the observer sampling station; (ii) All salmon stored in the container must remain in view of the observer at the observer sampling station at all times...

  14. 77 FR 37656 - Multi-Species Habitat Conservation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ... the survival and recovery of the species in the wild; and (5) the applicant will meet other measures... phlox (Phlox hirsuta), and from NMFS for the Southern Oregon/Northern California Coast coho salmon... the ITP for the unlisted Klamath and Trinity Rivers Chinook salmon (O. tshawytscha) ESU and the...

  15. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  16. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Facility Operation and Maintenance and Monitoring and Evaluation, 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Lofy, Peter T.

    2002-11-01

    This is the second annual report of a multi-year, multi-agency project to restore spring chinook salmon populations in the Grande Ronde River Basin (Grande Ronde Endemic Chinook Salmon Program--GRESCP). The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operates adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Supplementation using conventional and captive broodstock techniques is being used to increase natural production and restore fisheries in these two streams. Statement of Work Objectives formore » 1999: (1) Participate in development and continued implementation of the comprehensive multi year operations plan for the Grande Ronde Endemic Supplementation Program. (2) Ensure proper construction and trial operation of semi-permanent adult and juvenile facilities for use in 2000. (3) Monitor adult endemic spring chinook salmon populations and collect broodstock. (4) Plan detailed Monitoring and Evaluation for future years. (5) Monitor population abundance and characteristics and local environmental factors that may influence abundance and run timing of Grande Ronde River spring chinook populations. (6) Participate in Monitoring and Evaluation of the captive brood component of the Program to assure this component is contributing to the Program. (7) Participate in data collection for incidentally-caught bull trout and summer steelhead and planning for recovery of summer steelhead populations. (8) Document accomplishments and needs to permitters, comanagers, and funding agencies. (9) Communicate project results to the scientific community.« less

  17. Lower Columbia River Salmon Business Plan for Terminal Fisheries : Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salmon For All

    1996-07-01

    Salmon fishing in the Northwest requires a public-private partnership. The public through its decision-makers, agencies, and laws states it will do all that is necessary to protect and preserve the valuable salmon resource. Yet, the public side of the partnership is broken. The Columbia River salmon fishing industry, with over 140 years of documented history, is at a crossroads. This report explores a variety of issues, concerns, and ideas related to terminal fishery development. In some cases recommendations are made. In addition, options are explored with an understanding that those designated as decision-makers must make decisions following considerable discussion andmore » reflection.« less

  18. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program: Monitoring and Evaluation, 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boe, Stephen J.; Weldert, Rey F.; Crump, Carrie A.

    2003-03-01

    This is the fifth annual report of a multi-year project to operate adult collection and juvenile acclimation facilities on Catherine Creek and the upper Grande Ronde River for Snake River spring chinook salmon. These two streams have historically supported populations that provided significant tribal and non-tribal fisheries. Conventional and captive broodstock supplementation techniques are being used to restore spring chinook salmon fisheries in these streams. Statement of Work Objectives for 2002: (1) Plan for, administer, coordinate and assist comanagers in GRESCP M&E activities. (2) Evaluate performance of supplemented juvenile spring chinook salmon. (3) Evaluate life history differences between wild andmore » hatchery-origin (F{sub 1}) adult spring chinook salmon. (4) Describe life history characteristics and genetics of adult summer steelhead collected at weirs.« less

  19. Low Impact Development Master Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loftin, Samuel R.

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  20. Master Plan for Education: Achieving the Santa Monica College Vision. Changing Lives through Excellence in Education for a Global Community. Revised.

    ERIC Educational Resources Information Center

    Santa Monica Coll., CA. Office of Institutional Research.

    This report is the 1999 Santa Monica College Educational Master Plan revision. In 1997, the College adopted its first formal Master Plan for Education. Every three to five years, depending on the circumstances, that plan will be completely redone. During the intervening time period, there will be annual revisions to the plan. This revision…

  1. Developing a Master Plan for Your School. School Buildings Planning, Design, and Construction Series No. 1.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on how to set up a master planning team and establish a plan for quickly completing the building process. It provides an overview of…

  2. Fish mucus as a rapid responding tissue in diet switching studies

    EPA Science Inventory

    We are using stable isotopes of C, N, O and S (H planned) to study the ecology of coho salmon in streams of the Oregon Coast Range. One aspect of our work focuses on the incorporation of marine-derived nutrients into the diet of overwintering coho salmon juveniles. These studie...

  3. Coastal coho salmon research in the West Fork Smith River: Patterns of coho salmon size and survival within a complex watershed

    EPA Science Inventory

    Effective habitat restoration planning requires the ability to anticipate fish population responses to altered habitats. The EPA has conducted network-scale research to document habitat-specific growth and survival of juvenile salmonids in a complex watershed. These findings ha...

  4. Fish mucus as a rapidly responding tissue in diet switching studies

    EPA Science Inventory

    We are using stable isotopes of C, N, O and S (H planned) to study the ecology of coho salmon in streams of the Oregon Coast Range. One aspect of our work focuses on the incorporation of marine-derived nutrients into the diet of overwintering coho salmon juveniles. These studie...

  5. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  6. SEA effectiveness for landscape and master planning: An investigation in Sardinia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Montis, Andrea, E-mail: andreadm@uniss.it; Ledda, Antonio, E-mail: antonioledda@gmail.com; Caschili, Simone, E-mail: s.caschili@ucl.ac.uk

    The Italian administrative bodies and planning agencies have embraced with mixed feedbacks the introduction of Strategic Environmental Assessment (SEA) through the European Directive 2001/42/EC. Concurrently, regional and local spatial planning practice have been characterized by a new approach inspired by landscape planning. The Italian region of Sardinia has been one of the pioneering administrative bodies in the Italian and European arena that has adopted landscape principles for the construction of its regional master plan (PPR, Piano Paesaggistico Regionale). Municipalities are now carrying out the review of their master plans to the PPR's prescriptions and indications. Against this background, the aimmore » of this paper is to assess the level of SEA implementation in the municipal master plans of Sardinia, six years after the approval of the PPR. Rooted in the SEA international literature we construct a modular and adaptable on-line survey for officers involved in the review of municipal master plans. The results show that many Sardinian municipalities have not reviewed their master plans to the PPR's regulations yet and only a few municipalities have started this review process according to the SEA procedure. - Highlights: • We study strategic environmental assessment (SEA) effectiveness on land use plans • Four SEA implementation key issues are drawn from international literature • Data collection has included an on-line survey with close and open questions • Results indicate that SEA has been poorly implemented in landscape and master plans • Weak aspects include planning alternatives, financial resources, and monitoring.« less

  7. Facility Master Plans: An Essential First Step in the Building Development Process.

    ERIC Educational Resources Information Center

    Wickerham, Wendell E.

    2002-01-01

    Discusses the importance of the facility master plan (FMP) in defining project scope and validating or challenging the work of consultants. Offers three case studies illustrating how facility master plans averted problems or led to unanticipated benefits for the colleges involved. (EV)

  8. Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hillson, Todd D.

    2009-06-12

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of thismore » species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production would be the most likely way to produce the most rapid sustainable improvement in chum runs. Specifically, it was assumed that improving habitat conditions would promote efficient natural production, and that the most rapid way to rebuild the run would be to combine releases of an appropriate stock into the improved habitat. WDFW's recovery strategy for LCR chum salmon, as outlined in the WDFW Grays River and Washougal Hatchery Genetic Management Plans (HGMP), is as follows. First, determine if remnant populations of chum salmon exist in LCR tributaries. Second, if such populations exist, develop stock-specific recovery plans involving habitat restoration that include the creation of spawning refugias, supplementation where necessary, and a habitat and fish monitoring and evaluation plan.« less

  9. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  10. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  11. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  12. 77 FR 5306 - Proposed Collection; Comment Request for Form 4461, 4461-A, and 4461-B

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... comments concerning Form 4461, Application for Approval of Master or Prototype Defined Contribution Plan..., Application for Approval of Master or Prototype Plan, Mass Submitter Adopting Sponsor. DATES: Written comments... or Prototype Defined Contribution Plan; Form 4461-A, Application for Approval of Master [[Page 5307...

  13. Is it hip? Identifying streams with high intrinsic potential to provide salmon and trout.

    Treesearch

    Jonathan Thompson

    2005-01-01

    Decisionmakers concerned with Pacific salmon and trout have, out of necessity, relied on limited, site-scale information when planning and evaluating efforts to protect or restore freshwater habitat. To help broaden the context of conservation approaches, scientists in the Coastal Landscape Analysis and Modeling Study (CLAMS) have developed tools that characterize the...

  14. 76 FR 20652 - Idaho Power Company; Notice of Application of Land Management Plan Update for the Bliss, Upper...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... Salmon Falls, and Lower Salmon Falls Projects and Soliciting Comments, Motions To Intervene, and Protests..., motions to intervene, and protests: May 6, 2011. All documents may be filed electronically via the... the project numbers (P-1975-109, P-2777-115, and P- 2061-088) on any comments, motions, or...

  15. Snake River Sockeye Salmon (Oncorhynchus Nerka) Habitat/Limnologic Research : Annual Report 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spaulding, Scott

    1993-05-01

    This report outlines long-term planning and monitoring activities that occurred in 1991 and 1992 in the Stanley Basin Lakes of the upper Salmon River, Idaho for the purpose of sockeye salmon nerka) recovery. Limnological monitoring and experimental sampling protocol, designed to establish a limnological baseline and to evaluate sockeye salmon production capability of the lakes, are presented. Also presented are recommended passage improvements for current fish passage barriers/impediments on migratory routes to the lakes. We initiated O. nerka population evaluations for Redfish and Alturas lakes; this included population estimates of emerging kokanee fry entering each lake in the spring andmore » adult kokanee spawning surveys in tributary streams during the fall. Gill net evaluations of Alturas, Pettit, and Stanley lakes were done in September, 1992 to assess the relative abundance of fish species among the Stanley Basin lakes. Fish population data will be used to predict sockeye salmon production potential within a lake, as well as a baseline to monitor long-term fish community changes as a result of sockeye salmon recovery activities. Also included is a paper that reviews sockeye salmon enhancement activities in British Columbia and Alaska and recommends strategies for the release of age-0 sockeye salmon that will be produced from the current captive broodstock.« less

  16. Minimizing effects of over-water docks on federally listed fish stocks in McNary Reservoir: A literature review for criteria

    USGS Publications Warehouse

    Rondorf, Dennis W.; Rutz, Gary L.; Charrier, Jodi C.

    2010-01-01

    McNary Lock and Dam were completed in 1953, creating McNary Reservoir, or Lake Wallula. The shoreline of the reservoir is federally owned and as a result the U.S. Army Corps of Engineers (USACE) has certain land and fish habitat management responsibilities to balance with other multipurpose benefits. The Endangered Species Act (ESA) listing of Columbia and Snake River salmon stocks has changed the management of salmon harvest, hydropower operations, hatchery practices, and habitat management in recent years. There are 12 salmon Oncorhynchus spp., steelhead Oncorhynchus mykiss, and bull trout Salvelinus confluentus evolutionarily significant units (ESU‘s) that use this reach of the Columbia River at one or more stages in their life history. Of those 12, 8 are listed as threatened or endangered under the federal Endangered Species Act. The entire portion of the Columbia River in the Hanford Reach and McNary Reservoir is designated critical habitat for seven ESA-listed salmon species. The USACE is in the process of updating the 1983 McNary Lakeshore Management Plan. The updated Shoreline Plan provides criteria for private use of the federal shoreline of McNary Reservoir, specifically the permitting of private docks, over-water structures, and modifications to shoreline vegetation by adjacent land owners. The previous Shoreline Plan was written prior to the federal listing of salmon species. At the request of the USACE, the purpose of this report is to review information from the literature and determine the extent to which the criteria proposed by USACE for the docks and over-water structures are supported by the current body of scientific knowledge.

  17. Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the studymore » of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.« less

  18. Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the studymore » of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.« less

  19. Salmon Supplementation Studies in Idaho Rivers, 1996-1998 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reighn, Christopher A.; Lewis, Bert; Taki, Doug

    1999-06-01

    Information contained in this report summarizes the work that has been done by the Shoshone-Bannock Tribes Fisheries Department under BPA Project No. 89-098-3, Contract Number 92-BI-49450. Relevant data generated by the Shoshone-Bannock Tribe will be collated with other ISS cooperator data collected from the Salmon and Clearwater rivers and tributary streams. A summary of data presented in this report and an initial project-wide level supplementation evaluation will be available in the ISS 5 year report that is currently in progress. The Shoshone-Bannock Tribal Fisheries Department is responsible for monitoring a variety of chinook salmon (Oncorhynchus tshawytscha) production parameters as partmore » of the Idaho Supplementation Studies (BPA Project No. 89-098-3, Contract Number 92-BI-49450). Parameters include parr abundance in tributaries to the upper Salmon River; adult chinook salmon spawner abundance, redd counts, and carcass collection. A rotary screw trap is operated on the East Fork Salmon River and West Fork Yankee Fork Salmon River to enumerate and PIT-tag chinook smolts. These traps are also used to monitor parr movement, and collect individuals for the State and Tribal chinook salmon captive rearing program. The SBT monitors fisheries parameters in the following six tributaries of the Salmon River: Bear Valley Creek, East Fork Salmon River, Herd Creek, South Fork Salmon River, Valley Creek, and West Fork Yankee Fork. Chinook populations in all SBT-ISS monitored streams continue to decline. The South Fork Salmon River and Bear Valley Creek have the strongest remaining populations. Snorkel survey methodology was used to obtain parr population estimates for ISS streams from 1992 to 1997. Confidence intervals for the parr population estimates were large, especially when the populations were low. In 1998, based on ISS cooperator agreement, snorkeling to obtain parr population estimates was ceased due to the large confidence intervals. A rotary screw trap was operated on the West Fork Yankee Fork during the spring, summer, and fall of 1998 to monitor juvenile chinook migration. A screw trap was also operated on the East Fork of the Salmon River during the spring and fall from 1993 to 1997. Supplementation treatments have occurred on the South Fork Salmon River (IDFG), the East Fork Salmon River (EFSR), and the West Fork Yankee Fork of the Salmon River (WFYF). The EFSR received supplementation treatments yearly through 1995. There have been no treatments since 1995, and no significant future treatments from local broodstock are planned due to extremely poor escapement. The WFYF received a single presmolt treatment in 1994. There was an egg and adult release treatment in 1998 from the captive rearing program, not part of the original ISS study. Similarly, no significant future treatments are planned for the West Fork Yankee Fork due to extremely poor escapement. However, small scale experimental captive rearing and broodstock techniques are currently being tested with populations from the EFSR and WFYF. Captive rearing/broodstock techniques could potentially provide feedback for evaluation of supplementation. The other three SBT-ISS streams are control streams and do not receive supplementation treatments.« less

  20. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  1. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  2. 76 FR 3209 - West Los Angeles VA Medical Center Veterans Programs Enhancement Act of 1998; Draft Master Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-19

    ... Federal Register Notice announces an opportunity for public comment on the West Los Angeles (WLA... to ``Notice: Draft Master Plan.'' All comments received will be available for public inspection in...-recurring filming and single-day event agreements. The purpose of the Draft Master Plan is to satisfy the...

  3. The Economic Impact of Implementing the Cincinnati Public Schools' Facilities Master Plan on Greater Cincinnati.

    ERIC Educational Resources Information Center

    Rexhausen, Jeff

    The construction proposed in the Cincinnati Public Schools' Facilities Master Plan will have a significant impact on the greater Cincinnati, Ohio, economy. Highlights include: (1) the Facilities Master Plan of the Cincinnati Public Schools envisions a 10-year program with $985 million in construction spending. The funding of this program includes…

  4. The economic impact on the forest sector of critical habitat delineation for salmon in the Columbia and Snake River basins.

    Treesearch

    R.W. Haynes; N.A. Bolon; D.T. Hormaechea

    1992-01-01

    Economic implications of critical habitat designation (CHD) for salmon in the Columbia River basin were estimated in advance of actual designation and recovery plan development. Economic impacts on Pacific, Northwest, Intermountain, and Northern Region National Forests' range, recreation, timber, and mineral programs in the Columbia and Snake River basins were...

  5. Temporal variation in synchrony among chinook salmon (Oncorhynchus tshawytscha) redd counts from a wilderness area in central Idaho

    Treesearch

    D. J. Isaak; R. F. Thurow; B. E. Rieman; J. B. Dunham

    2003-01-01

    Metapopulation dynamics have emerged as a key consideration in conservation planning for salmonid fishes. Implicit to many models of spatially structured populations is a degree of synchrony, or correlation, among populations. We used a spatially and temporally extensive database of chinook salmon (Oncorhynchus tshawytscha) redd counts from a wilderness area in central...

  6. 75 FR 27705 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... subject line of e-mail comments use the following identifier: Comments on CCC Coho Draft Plan. This...: Comments on CCC Coho Draft Plan. Comments may be submitted via facsimile (fax) to (707) 578-3435. Persons... Request for CCC coho salmon Recovery Draft Plan.'' Electronic copies of the Draft Plan are also available...

  7. Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and Land Use Map. USACOE, 31 December 1954 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  8. Homeroom Activities in a College of Technology Based on the Master Plan

    NASA Astrophysics Data System (ADS)

    Fuchida, Kunihiiko; Murata, Hideaki; Yuji, Junichiro

    Homeroom (HR) activities have an important role in engineering education at technical colleges. Yatsushiro National College of Technology has made a master plan for them and has been putting the plan into practical use since 2002. This plan is comprehensive and has two main categories, social education and career guidance, both being composed of three sub-categories (e.g., self-understanding and making future plans) . Based on the master plan, each HR teacher makes his own plan for HR activities for his classroom at the beginning of the academic year. We have reached a consensus to share our practice and to improve HR activities for years to come. We also recognize that to carry out HR activities based on a master plan that reflects the school's educational goals is essential in order to train students who are well-prepared, both as engineers and as humans.

  9. Master Plan: Lake Barkley, Cumberland River, Kentucky - Tennessee.

    DTIC Science & Technology

    1983-01-01

    VASE 2 LOISVLLE7, DIXON GPM INGTAt PARK 28 PT. MA6AC STT PARR-*BCOLUMBUS BELMONT BATTLE ST PARK 10 REELFOOT LAKE STATV P-’ t ELYFREST STATE PAP, 01.6T...Plan: Lake garkley,Cumberland River, 3 Kentucky - Tennessee. Master Plan Update. 6. PERFORMING ORG. REPORT NUMBER 7- AUTHOR(s) 8. CONTRACT OR GRANT...block number) Lake Barkley, Kentucky. Interpretative programs. Cumberland River Recreation. Land Between the Lakes . Master Plan. 20. ABSTRACT (Continue

  10. Doubling sockeye salmon production in the Fraser River—Is this sustainable development?

    NASA Astrophysics Data System (ADS)

    Henderson, Michael A.; Healey, Michael C.

    1993-11-01

    We evaluate a proposal to double sockeye salmon production from the Fraser River and conclude that significant changes will be required to current management processes, particularly the way available catch is allocated, if the plan is to be consistent with five major principles embodied in the concept of sustainable development. Doubling sockeye salmon production will not, in itself, increase economic equity either regionally or globally. Developing nations may actually be hindered in their attempts to institute other, nonsalmon fisheries in the North Pacific Ocean as a result of the possible interception of salmon. Further, other users of the Fraser River basin will have to forgo opportunities so that salmon habitat can be conserved. If doubling sockeye salmon production is to meet the goal of doing more with less, it will be necessary to develop more efficient technologies to harvest the fish. If increasing salmon production is to reflect the integration of environmental and economic decision making at the highest level, then a serious attempt must be made to incorporate environmental assets into national economic accounting. Finally, to promote biodiversity and cultural self-sufficiency within the Fraser River basin, it will be important to safeguard the small, less-productive salmon stocks as well as the large ones and to allocate a substantial portion of the increased production to the Native Indian community.

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  12. Key Elements of a State Master Plan in Higher Education

    ERIC Educational Resources Information Center

    McHenry, Kristen L.; Flora, Bethany H.

    2017-01-01

    A master plan in higher education is developed to address the academic and workforce needs of a particular state. The master plan helps serve as the roadmap for implementation of proposed strategies to reach state goals in education and degree attainment. In Tennessee, Drive to 55 is a state-wide effort to increase the number of Tennesseans with a…

  13. Social Work Education. Report of Master Plan Committee S.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield. Master Plan Committee.

    This report of the Master Plan Committee on Social Work Education is part of Phase III of the Illinois Statewide Master Plan for Higher Education dealing with graduate and professional education. Part I presents an overview. Part II gives a brief description of social work and a statement of the problem. In Part III the social work manpower in the…

  14. Corridor Planning And Feasibility Analysis Corridor, Master Plan

    DOT National Transportation Integrated Search

    1996-04-01

    THE I-70 RURAL IVHS CORRIDOR MASTER PLAN IS THE GUIDANCE DOCUMENT FOR DEPLOYMENT OF THE INTELLIGENT TRANSPORTATION SYSTEM (ITS) FOR THE INTERSTATE-70 CORRIDOR FROM DENVER TO GLENWOOD SPRINGS, COLORADO. AS A WORKING DOCUMENT, THE PLAN RECOMMENDS STRAT...

  15. Simulated growth and production of endangered Snake River Sockeye Salmon: Assessing management strategies for the nursery lakes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Luecke, C.; Wurtsbaugh, W.A.; Budy, P.

    1996-06-01

    This document examines the potential of employing a series of lake management strategies to enhance production of endangered Snake River sockeye salmon (Oncorhynchus nerka) in its historical nursery lakes in central Idaho. A combination of limnological sampling, experimentation, and simulation modeling was used to assess effects of lake fertilization and kokanee reduction on growth and survival of juvenile sockeye salmon. Juvenile sockeye salmon from a broodstock of this endangered species are being introduced into the lakes from 1995 to 1998. Results of our analyses indicated that several lakes were suitable for receiving broodstock progeny. Field experimentation and simulation modeling indicatedmore » that lake fertilization, coupled with a program of kokanee reduction, provided the management option most likely to enhance the survival of stocked juvenile sockeye salmon. Simulation models that encompass physiological requirements, ecological interactions, and life-history consequences could be used as templates to help develop recovery plans for other endangered fishes. 4 figs., 2 tabs.« less

  16. From Chaos to Order and Back? A Revisionist Reflection on the California Master Plan for Higher Education@50 and Thoughts about Its Future. Research & Occasional Paper Series: CSHE.7.10

    ERIC Educational Resources Information Center

    Douglass, John Aubrey

    2010-01-01

    In 1960, California developed a "master plan" for its already famed public higher education system. It was and continues to be arguably the single most influential effort to plan the future of a system of higher education in the annals of American higher education. Despite popular belief, however, the California Master Plan for Higher…

  17. Patterns of d18O in fish tissues in two Oregon Coast range streams

    EPA Science Inventory

    We are using stable isotopes of C, N, O and S (H planned) to study the ecology of coho salmon in streams of the Oregon Coast Range. As part of this work we have examined changes in d18O in coho salmon juveniles (from eggs to smolting) and sculpin (from 0.5 to 20 gm.). For fish...

  18. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan : executive summary.

    DOT National Transportation Integrated Search

    2012-06-01

    Border Master Plans, as defined and supported by the U.S./Mexico Joint Working : Committee on Transportation Planning and Programming, the Federal Highway Administration, : and the U.S. Department of State, are comprehensive long range plans to inven...

  19. 18 CFR 708.4 - Required programs and reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... part of the Master Plan—Plan of Study. The work plan shall satisfy minimum standards described in this... related to implementation of the Master Plan. These recommendations shall be based on evaluation of...

  20. Career Opportunities in Texas: A Master Plan for Vocational and Technical Education (1989 Update).

    ERIC Educational Resources Information Center

    Texas State Board of Education, Austin.

    In January 1987, a Master Plan for the delivery of vocational and technical education in Texas was adopted by the State Board of Education (SBOE). The master plan details goals and strategies to assist in the development of a skilled and educated work force in Texas as the state enters the 21st century. As part of their mandated annual review…

  1. Using multi-disciplinary strategic master facilities planning for organizations experiencing programmatic re-direction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heubach, J.G.; Weimer, W.C.; Bruce, W.A.

    Facility master planning is critical to the future productivity of a laboratory and the quality of worklife for the laboratory staff. For organizations undergoing programmatic re-direction, a master facility planning approach linked to the organization`s strategic planning process is even more important. Major changes in an organization such as programmatic re-direction can significantly impact a broad range of variables which exceed the expertise of traditional planning teams, e.g., capacity variability, work team organization, organizational culture, and work process simplification. By expanding the diversity of the participants of the planning team, there is a greater likelihood that a research organization`s scientific,more » organizational, economic, and employees` needs can be meshed in the strategic plan and facility plan. Recent recommendations from facility planners suggest drawing from diverse fields in building multi-disciplinary planning teams: Architecture, engineering, natural science, social psychology, and strategic planning (Gibson,1993). For organizations undergoing significant operational or culture change, the master facility planning team should also include members with expertise in organizational effectiveness, industrial engineering, human resources, and environmental psychology. A recent planning and design project provides an example which illustrates the use of an expanded multi-disciplinary team engaged in planning laboratory renovations for a research organization undergoing programmatic re-direction. The purpose of the proposed poster session is to present a multi-disciplinary master facility planning process linked to an organization`s strategic planning process or organizational strategies.« less

  2. Post-release behavior and movement patterns of Chinook salmon (Oncorhynchus tshawytscha) and coho salmon (Oncorhynchus kisutch) after capture using alternative commercial fish gear, lower Columbia River, Washington and Oregon, 2013

    USGS Publications Warehouse

    Liedtke, Theresa L.; Kock, Tobias J.; Evans, Scott D.; Hansen, Gabriel S.; Rondorf, Dennis W.

    2014-01-01

    In 2011 and 2012, WDFW conducted post-release mortality studies of steelhead (Oncorhynchus mykiss), Chinook salmon (Oncorhynchus tshawytscha), and coho salmon (Oncorhynchus kisutch) that were captured using beach or purse seines. These studies were comprised of two groups of fish tagged with passive integrated transponder tags (PIT tags): (1) treatment fish that were captured by one of the gear types 9–25 river kilometers (rkm) downstream of Bonneville Dam (rkm 234); and (2) control fish that were captured at the Adult Fish Facility near the Washington shore fish ladder at Bonneville Dam, and then transported and released 8 rkm downstream of the Bonneville Dam. Fish were confirmed to have survived if they moved upstream and were detected on PIT-tag antennas at or upstream of Bonneville Dam, were recovered at hatcheries or at the dam, or were captured by commercial or sport fishers. Post-release survival estimates were higher for steelhead (89–98 percent) than for Chinook salmon and coho salmon (50–90 percent; Washington Department of Fish and Wildlife, unpub. data, 2014). However, some Chinook salmon and coho salmon return to hatcheries, or spawn in the mainstem Columbia River and in tributaries downstream of Bonneville Dam. The proportion of Chinook salmon and coho salmon in the treatment group that were destined for areas downstream of Bonneville Dam likely was higher than in the control group because the control fish were collected as they were attempting to pass the dam. If this assertion was true, mortality would have been overestimated in these studies, so WDFW developed a study plan to determine the post-release movements and intended location of Chinook salmon and coho salmon collected with beach and purse seines in the lower Columbia River.

  3. The persistence and characteristics of Chinook salmon migrations to the Upper Klamath River prior to exclusion by dams

    USGS Publications Warehouse

    Hamilton, John B; Rondorf, Dennis W.; Tinniswood, William; Leary, Ryan J; Mayer, Tim; Gavette, Charleen; Casal, Lynne A.

    2016-01-01

    In this research article, John Hamilton and his co-authors present extensive new research and information gathered since a 2005 publication on the historical evidence of anadromomous fish distribution in the Upper Klamath River watershed. Using historical accounts from early explorers and ethnographers to early-twentieth-century photographs, newspaper accounts, and government reports, the authors provide a more complete record of past salmon migrations. The updated record “substantiate[s] the historical persistence of salmon, their migration characteristics, and the broad population baseline that will be key to future commercial, recreational, and Tribal fisheries in the Klamath River and beyond.” During a time when salmon restoration plans are being considered in the region, the historical record can serve as guidance to once again establish diverse and thriving populations.

  4. New Jersey Department of Transportation - Statewide Bicycle and Pedestrian Master Plan - June 1995

    DOT National Transportation Integrated Search

    1995-06-01

    The New Jersey Department of Transportation's Statewide Bicycle and Pedestrian Master Plan presents a collective vision, policy and action plan for improving the bicycling and walking environment throughout the state. The plan is part of a comprehens...

  5. 76 FR 52317 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... authority. Recovery of Upper Willamette salmon and steelhead will require a long-term effort in cooperation... and Threatened Species; Recovery Plans AGENCY: National Marine Fisheries Service, National Oceanic and... Service (NMFS) announces the adoption of an Endangered Species Act (ESA) recovery plan for the Upper...

  6. 78 FR 69527 - Proposed Collection; Comment Request for Form 5307

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ... 5307, Application for Determination for Adopters of Master or Prototype or Volume Submitter Plans... . SUPPLEMENTARY INFORMATION: Title: Application for Determination for Adopters of Master or Prototype or Volume... purpose by adopters of master or prototype or volume submitter plans. Current Actions: There are no...

  7. Yakima River Radio-Telemetry Study: Spring Chinook Salmon, 1991-1992 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hockersmith, Eric

    1994-09-01

    As part of the presupplementation planning, baseline data on the productivity of spring chinook salmon (Oncorhynchus tshawytscha) in the Yakima River have been collected. However, for adult salmonids, data on habitat use, delays in passage at irrigation diversions, migration rates, and substock separation had not been previously collected. In 1991, the National Marine Fisheries Service began a 2-year radio-telemetry study of adult spring chinook salmon in the Yakima River Basin. Specific objectives addressed in this study were: to determine spawning populations` run timing, passage patterns at irrigation diversion dams, and morphometric characteristics to determine where and when substocks become separated;more » to evaluate fish passage at Yakima River Basin diversion dams including Prosser, Sunnyside, Wapato, Roza, Town Diversion, Easton, Cowiche, and Wapatox Dams; to determine spring chinook salmon migration rates between Yakima River Basin dams, prespawning behavior, temporal distribution, and habitat utilization; to identify spawning distribution and timing of spring chinook salmon; to determine the amount and cause of prespawning mortality of spring chinook salmon; and to evaluate adult fish-handling procedures for the right-bank, adult-trapping facility at Prosser Dam.« less

  8. Fermilab | OCSR | Home

    Science.gov Websites

    Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected

  9. 77 FR 7134 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-10

    ... copy (i.e., CD ROM) from Cynthia Anderson by calling (707) 825-5162 or by emailing a request to [email protected] with the subject line ``CD ROM Request for SONCC Coho Salmon Draft Recovery Plan...

  10. Master-planned in exurbia: examining the drivers and impacts of master-planned communities at the urban fringe

    Treesearch

    Jenna H. Tilt; Lee Cerveny

    2013-01-01

    Smart growth strategies of infill and compact growth in existing suburban cities will most likely not be sufficient to absorb a new US household growth in the future. To meet housing demands and preferences, master-planned communities will continue to be built in outlying exurban areas. However, little is known about the impacts these communities may have on the...

  11. Laredo District Coahuila/Nuevo Leon/Tamaulipas border master plan.

    DOT National Transportation Integrated Search

    2012-06-01

    Border Master Plans document a regions needs and priorities, and recommend a mechanism to ensure coordination on current and planned future port of entry (POE) projects and supporting transportation infrastructure to serve the anticipated demand i...

  12. Landscape and Climate Adaptation Planning for the Mashel ...

    EPA Pesticide Factsheets

    Salmon are important to the economic, social, cultural, and aesthetic values of the people in the Nisqually River. The Mashel watershed is important to recovery of Chinook salmon (Oncorhynchus tshawytscha) and winter steelhead (O. mykiss), and long-term sustainability of coho salmon (O. kisutch) in the Nisqually basin. The Mashel is the second largest Nisqually subwatershed by area (84 square miles) and is the largest tributary by flow accessible to salmonids. It is mostly forested, a combination of regularly harvested state and private timberlands. The watershed and salmonids utilizing the Mashel are particularly vulnerable to changes in seasonal precipitation and temperature because of its hydrologic flashiness, low summer flows and potential for sediment transport.We analyzed fish habitat potential under alternative forest management and climate scenarios using a linked modeling framework. The modeling framework includes a spatially-distributed watershed simulator (VELMA - Visualizing Ecosystem Land Management Assessments). VELMA quantifies effects of forest management and climate scenarios on key flow variables affecting salmon habitat. Spatially distributed output from VELMA was input to the Ecosystem Diagnosis and Treatment (EDT) fish habitat model to evaluate salmonid habitat potential and population responses.We show how historic timber harvest is still affecting salmonid habitat potential and how a community forest based management plan could be more pr

  13. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... projects of the Plan, including pilot projects and operational elements, based on the best scientific, technical, funding, contracting, and other information available. The Corps of Engineers and the South...

  14. Final Environmental Assessment: For Joint Base Anacostia-Bolling Master Plan District of Columbia

    DTIC Science & Technology

    2010-09-30

    the impacts of vehicle travel and facilitate alternative modes of transportation that would reduce air pollutants . Noise: There would be...ltlb•nKM nr~t~~G.,~ StEiiubetlls Fort McNair East Potomac Pari < Poplar Point "" Joint Base Anacostia-Bolling Master Plan Environmental...Industrial $uppon Eost Potomac Pari < Poplar Point Joint Base Anacostia-Bolling Master Plan Environmental Assessment pg. 16 Several general

  15. Andrews University Master Plan for Campus Expansion and the Development Program, 1977-1985.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    Described in detail in this partly promotional, partly informational publication are the history of campus planning, new master plan, and new capital programs of this Seventh Day Adventist institution. Numerous maps, photographs, and tables of financial and statistical data illustrate the plan. (MSE)

  16. Salmon Supplementation Studies in Idaho Rivers, 1999-2000 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohler, Andy; Taki, Doug; Teton, Angelo

    2001-11-01

    As part of the Idaho Supplementation Studies, fisheries crews from the Shoshone-Bannock Tribes have been snorkeling tributaries of the Salmon River to estimate chinook salmon (Oncorhynchus tshawytscha) parr abundance; conducting surveys of spawning adult chinook salmon to determine the number of redds constructed and collect carcass information; operating a rotary screw trap on the East Fork Salmon River and West Fork Yankee Fork Salmon River to enumerate and PIT-tag emigrating juvenile chinook salmon; and collecting and PIT-tagging juvenile chinook salmon on tributaries of the Salmon River. The Tribes work in the following six tributaries of the Salmon River: Bear Valleymore » Creek, East Fork Salmon River, Herd Creek, South Fork Salmon River, Valley Creek, and West Fork Yankee Fork Salmon River. Snorkeling was used to obtain parr population estimates for ISS streams from 1992 to 1997. However, using the relatively vigorous methods described in the ISS experimental design to estimate summer chinook parr populations, results on a project-wide basis showed extraordinarily large confidence intervals and coefficients of variation. ISS cooperators modified their sampling design over a few years to reduce the variation around parr population estimates without success. Consequently, in 1998 snorkeling to obtain parr population estimates was discontinued and only General Parr Monitoring (GPM) sites are snorkeled. The number of redds observed in SBT-ISS streams has continued to decline as determined by five year cycles. Relatively weak strongholds continue to occur in the South Fork Salmon River and Bear Valley Creek. A rotary screw trap was operated on the West Fork Yankee Fork during the spring and fall of 1999 and the spring of 2000 to monitor juvenile chinook migration. A screw trap was also operated on the East Fork of the Salmon River during the spring and fall from 1993 to 1997 and 1999 (fall only) to 2000. Significant supplementation treatments have occurred in the South Fork Salmon River (IDFG). The East Fork Salmon River received supplementation treatments yearly through 1995. There have been no treatments since 1995, and no significant future treatments from local broodstock are conceivable due to extremely poor escapement. The West Fork Yankee Fork received a single presmolt treatment in 1994. Similarly, no significant future treatments are planned for the WFYF due to extremely poor escapement. However, small scale experimental captive rearing and broodstock techniques are currently being tested with populations from the EFSR and WFYF. Captive rearing/broodstock techniques could potentially provide feedback for evaluation of supplementation. The other three SBT-ISS streams are control streams and do not receive hatchery treatments.« less

  17. Potential Effects of Dams on Migratory Fish in the Mekong River: Lessons from Salmon in the Fraser and Columbia Rivers

    NASA Astrophysics Data System (ADS)

    Ferguson, John W.; Healey, Michael; Dugan, Patrick; Barlow, Chris

    2011-01-01

    We compared the effects of water resource development on migratory fish in two North American rivers using a descriptive approach based on four high-level indicators: (1) trends in abundance of Pacific salmon, (2) reliance on artificial production to maintain fisheries, (3) proportion of adult salmon that are wild- versus hatchery-origin, and (4) number of salmon populations needing federal protection to avoid extinction. The two rivers had similar biological and physical features but radically different levels of water resource development: the Fraser River has few dams and all are located in tributaries, whereas the Columbia River has more than 130 large mainstem and tributary dams. Not surprisingly, we found substantial effects of development on salmon in the Columbia River. We related the results to potential effects on migratory fish in the Mekong River where nearly 200 mainstem and tributary dams are installed, under construction, or planned and could have profound effects on its 135 migratory fish species. Impacts will vary with dam location due to differential fish production within the basin, with overall effects likely being greatest from 11 proposed mainstem dams. Minimizing impacts will require decades to design specialized fish passage facilities, dam operations, and artificial production, and is complicated by the Mekong's high diversity and productivity. Prompt action is needed by governments and fisheries managers to plan Mekong water resource development wisely to prevent impacts to the world's most productive inland fisheries, and food security and employment opportunities for millions of people in the region.

  18. The Austin Community College District Master Plan: FY 2004-2006.

    ERIC Educational Resources Information Center

    Austin Community Coll., TX.

    This Austin Community College (ACC) District Master Plan for 2004-2006 continues ACC's efforts to manage growth and change through a comprehensive planning process. The planning process was coordinated with the ACC Southern Association of Colleges and Schools (SACS) Alternate Self Study. This study addresses the following areas: (1) Fiscal…

  19. El Camino College Master Plan.

    ERIC Educational Resources Information Center

    El Camino Coll., Torrance, CA.

    This document is the educational Master Plan for El Camino Community College District. The purpose of the plan is to develop a research-based document that will be used as a foundation for decisions regarding instructional programs, support services, staffing and facilities. It is intended to serve as the basic foundation for all other plans of…

  20. California Master Plan for Migrant Education, 1976 Edition (Plan Maestro de California para Educacion Migrante, Edicion de 1976).

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Div. of Compensatory Education.

    Based on the national migrant education plan, California's master plan aims to mobilize the necessary State and Federal resources, and to unify and assist the efforts of local educational agencies to end the migrant child's failure in school. The plan includes provisions for: instructional activities on a regular and extended year basis designed…

  1. Directions. The Master Plan for McLennan Community College.

    ERIC Educational Resources Information Center

    Lowe, Carol, Ed.

    This master plan for McLennan Community College (MCC) begins with a mission statement, brief history of the college, and a summary of the planning process. The remainder of the plan lists the 67 strategic goals of the college, the strategies that will be used to attain them, and the planning context within which the goals were developed. In many…

  2. The response of stream periphyton to Pacific salmon: using a model to understand the role of environmental context

    USGS Publications Warehouse

    Bellmore, J. Ryan; Fremier, Alexander K.; Mejia, Francine; Newsom, Michael

    2014-01-01

    1. In stream ecosystems, Pacific salmon deliver subsidies of marine-derived nutrients and disturb the stream bed during spawning. The net effect of this nutrient subsidy and physical disturbance on biological communities can be hard to predict and is likely to be mediated by environmental conditions. For periphyton, empirical studies have revealed that the magnitude and direction of the response to salmon varies from one location to the next. Salmon appear to increase periphyton biomass and/or production in some contexts (a positive response), but decrease them in others (a negative response). 2. To reconcile these seemingly conflicting results, we constructed a system dynamics model that links periphyton biomass and production to salmon spawning. We used this model to explore how environmental conditions influence the periphyton response to salmon. 3. Our simulations suggest that the periphyton response to salmon is strongly mediated by both background nutrient concentrations and the proportion of the stream bed suitable for spawning. Positive periphyton responses occurred when both background nutrient concentrations were low (nutrient limiting conditions) and when little of the stream bed was suitable for spawning (because the substratum is too coarse). In contrast, negative responses occurred when nutrient concentrations were higher or a larger proportion of the bed was suitable for spawning. 4. Although periphyton biomass generally remained above or below background conditions for several months following spawning, periphyton production returned quickly to background values shortly afterwards. As a result, based upon our simulations, salmon did not greatly increase or decrease overall annual periphyton production. This suggests that any increase in production by fish or invertebrates in response to returning salmon is more likely to occur via direct consumption of salmon carcasses and/or eggs, rather than the indirect effects of greater periphyton production. 5. Overall, our simulations suggest that environmental factors need to be taken into account when considering the effects of spawning salmon on aquatic ecosystems. Our model offers researchers a framework for testing periphyton response to salmon across a range of conditions, which can be used to generate hypotheses, plan field experiments and guide data collection.

  3. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...

  4. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...

  5. 18 CFR 708.3 - Policy, objectives, and standards.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... improved popular understanding of official studies, planning processes, and decisions. (3) In order for... participation section of the Master Plan—Plan of Study shall be developed consistent with the guidelines... Master Plan shall aim for the highest achievable standards of objectivity and thoroughness consistent...

  6. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  7. 3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  8. Foothill-De Anza Community College District, 2005: Planning for the New Millennium. Educational Master Plan, Spring 1999.

    ERIC Educational Resources Information Center

    Foothill-De Anza Community Coll. District, Los Altos Hills, CA.

    This document presents Foothill-De Anza Community College District's educational master plan. This report begins with the district's mission statement and is divided into five parts. "Preface: The Last Decade" looks at what occurred at Foothill-De Anza Community College District from 1988-98. "Plan Overview" outlines the…

  9. 107. Air defense command "master plan, basic mission plan," RCA ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. Air defense command "master plan, basic mission plan," RCA Service Company tab no. F-1, sheet 2 of 2, dated 1 June, 1963. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  10. Master plans for pedestrian and bicycle transportation: community characteristics.

    PubMed

    Steinman, Lesley; Doescher, Mark; Levinger, David; Perry, Cynthia; Carter, Louise; Eyler, Amy; Aytur, Semra; Cradock, Angie L I; Evenson, Kelly R; Heinrich, Katie; Kerr, Jacqueline; Litt, Jill; Severcan, Yucel; Voorhees, Carolyn

    2010-03-01

    Recent research demonstrates the importance of targeting the built environment to support individual physical activity, particularly for people experiencing health disparities. Master plans to promote biking and/or pedestrians (BPMPs) are a potential method for environmental change. This descriptive study aims to provide a snapshot of plan attributes and better understand demographic, social and transportation characteristics of communities with BPMPs. We collected a census sample of BPMPs from 4 states. Population and commuting data were obtained from national statistics. 294 master plans were included, with most plans representing municipalities. 62% of plans targeted biking only, one-fifth targeted biking and walking, and 15% targeted walking only. The sampled locations have a similar demographic profile as the overall U.S. for median age and household income, people of color, high school education, and income inequality. The degree of racial diversity of sampled communities is slightly less than the U.S. average and the percentage of people who walk to work were slightly higher. Given that communities with master plans have a similar profile as the overall U.S., BPMPs could feasibly be spread to communities throughout the country. Further research is planned to describe BPMPs in detail toward informing future plan development.

  11. Archaeological Investigations on the East Fork of the Salmon River, Custer County, Idaho.

    DTIC Science & Technology

    1984-01-01

    coniferous environment in addition to pine marten (Martes americana), red squirrel (Tamiasciurus hudsonicus), porcupine (Erithizon dorsatum), mountain vole...can be seen in small herds throughout the East Fork valley from the Salmon River to Big Boulder Creek. Two bands of Rocky Mountain bighorn sheep...utilize the Challis Planning Unit, one on the East Fork and the other in the Birch Creek area. The East Fork herd is comprised of approximately 50-70

  12. Master Plan for Illinois Higher Education 1991.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield.

    This publication is the master plan for higher education in Illinois and covers statewide goals, institutional missions, instruction, research, public service, equal opportunity and affirmative action, student financial aid, and state funding. Section I lists goals for the Illinois Higher Education and Coordination and Planning Board and describes…

  13. Master Plan for Data Processing Services, 1988-1993. Report.

    ERIC Educational Resources Information Center

    Connecticut Regional Community Colleges, Hartford. Board of Trustees.

    Developed in accordance with a legislative mandate, this master plan for Connecticut's regional community colleges provides baseline data on the current status of data processing; identifies issues, trends, and constraints; and sets forth specific plans for computing activities and services within the community college system. Introductory…

  14. Yavapai College Master Plan. Overview.

    ERIC Educational Resources Information Center

    Yavapai Coll., Prescott, AZ.

    This document provides an overview of the Yavapai College (Arizona) master plan. The plan reflects feedback from and discussions with various business, governmental, and education leaders in the community. It largely consists of recommendations for construction and renovation of college facilities. Many of the buildings at Yavapai are aging,…

  15. Housing, health and master planning: rules of engagement.

    PubMed

    Harris, P; Haigh, F; Thornell, M; Molloy, L; Sainsbury, P

    2014-04-01

    Knowledge about health focussed policy collaboration to date has been either tactical or technical. This article focusses on both technical and tactical issues to describe the experience of cross-sectoral collaboration between health and housing stakeholders across the life of a housing master plan, including but not limited to a health impact assessment (HIA). A single explanatory case study of collaboration on a master plan to regenerate a deprived housing estate in Western Sydney was developed to explain why and how the collaboration worked or did not work. Data collection included stakeholder interviews, document review, and reflections by the health team. Following a realist approach, data was analysed against established public policy theory dimensions. Tactically we did not know what we were doing. Despite our technical knowledge and skills with health focussed processes, particularly HIA, we failed to appreciate complexities inherent in master planning. This limited our ability to provide information at the right points. Eventually however the HIA did provide substantive connections between the master plan and health. We use our analysis to develop technical and tactical rules of engagement for future cross-sectoral collaboration. This case study from the field provides insight for future health focussed policy collaboration. We demonstrate the technical and tactical requirements for future intersectoral policy and planning collaborations, including HIAs, with the housing sector on master planning. The experience also suggested how HIAs can be conducted flexibly alongside policy development rather than at a specific point after a policy is drafted. Copyright © 2014 The Royal Society for Public Health. All rights reserved.

  16. RESEARCH PLAN: LANDSCAPE AND WATERSHED INFLUENCES ON WILD SALMON AND FISH ASSEMBLAGES IN OREGON COASTAL STREAMS

    EPA Science Inventory

    This document is a Research Plan. In the Pacific Northwest (PNW), many populations of wild anadromous salmonids are in serious decline. Landscape change, water pollution, introduced predators, fishing, hydropower development, hatcheries, disadvantageous ocean conditions, and ot...

  17. 77 FR 54565 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... and authority. Recovery of Central California Coast coho salmon will require a long-term effort in... and Threatened Species; Recovery Plans AGENCY: National Marine Fisheries Service (NMFS), National... public meetings. SUMMARY: NMFS announces the adoption of a Final Endangered Species Act (ESA) recovery...

  18. Dance of denial. [The decline of Snake River chinook and sockeye

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel, J.

    The numbers of Snake River chinook and sockeye successfully completing their spawning migration to their home waters have declined drastically. In the summer of 1992, exactly one sockeye returned to its ancestral home. Grazing, stream diversions, dams, filling of wetlands, and pollution have all played a part in the decline, but dams remain the main cause. The Northwest Power Planning Council in 1992 approved a two-part strategy to save the salmon population: fish transport and drawing down Snake River reservoirs. Fish transport is not restoring the original salmon runs and drawdowns have not been done. The salmon continue to gomore » extinct and the economy of fishing towns and industries is being ruined.« less

  19. Long Range Facilities Master Plan: 1986-2000, San Diego Unified School District.

    ERIC Educational Resources Information Center

    Blair, Billie; And Others

    The Long-Range Facilities Master Plan presents solution strategies and financing methods for accommodating a projected student enrollment increase of 45,000 between 1986 and 2000. This increase, plus limited financial resources, school use studies, and recent legislation, necessitated the plan. The issues include housing students, facility…

  20. 78 FR 61373 - Animal Center Master Plan Record of Decision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... propose any land use changes outside NIHAC. Therefore, the NIHAC campus is anticipated to remain... analysis, Environmental Justice will not be discussed. Visual Quality The Master Plan's land use plan provides a framework to help organize future development at NIHAC so that similar land use types are...

  1. Master Plan and Chancellors Hall Southampton College.

    ERIC Educational Resources Information Center

    Linn, Charles

    1998-01-01

    Discusses a college master plan that remodeled old buildings, added new ones, and tied roads together on a campus that had experienced a haphazard evolution. The plan included splitting large parking lots into smaller ones divided by trees and plants, moving university functions of certain buildings to other locations, and strategically locating…

  2. Master Planning: The Never-Ending Story.

    ERIC Educational Resources Information Center

    Meyer, Darrell C.

    2000-01-01

    Explains how modern technology has changed college campus master planning from a one-time event to a continuous process. Explained are how the Internet allows for greater collaboration where the most recent ideas, plans, and program documents can be posted on a website and participants can use e-mail for instant communications. (GR)

  3. Master Plan Policies for Illinois Higher Education, 1997.

    ERIC Educational Resources Information Center

    Illinois State Board of Elections, Springfield.

    This document presents new or revised master plan policy statements for various segments of Illinois higher education. Chapter 1, on statewide goals and organization, lists goals for Illinois higher education, for coordination and planning, for the Board of Higher Education membership; and briefly discusses the organizational structure of public…

  4. 75 FR 61243 - Proposed Collection; Comment Request for Form 5307

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-04

    ... 5307, Application for Determination for Adopters of Master or Prototype or Volume Submitter Plans... or Prototype or Volume Submitter Plans. OMB Number: 1545-0200. Form Number: 5307. Abstract: Employers... used as an application for this purpose by adopters of master or prototype or volume submitter plans...

  5. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neitzel, Duane A.; Johnson, Gary E.

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of differentmore » views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.« less

  6. Proposed Master Plan for Higher Education in New Jersey.

    ERIC Educational Resources Information Center

    New Jersey State Commission on Higher Education.

    The draft Master Plan was developed in response to requirements of the New Jersey Higher Education Restructuring Act of 1994. The plan proposes a vision and broad policy recommendations for New Jersey higher education into the next century. The focus of the plan is on the critical needs of the state and how higher education can help in addressing…

  7. An Interpretive Master Plan at the Museum of Fine Arts, Houston

    ERIC Educational Resources Information Center

    Schneider, Beth B.

    2008-01-01

    This case study presents the methods the staff at the Museum of Fine Arts, Houston used to develop and implement an interpretive master plan from 1996-2000. The process can be a model for other museums. Looking back a decade after the plan was developed provides insights into the role of interpretive plans as statements of goals, expressions of…

  8. AUA Program Master Plan. Volume 1: Overview

    DOT National Transportation Integrated Search

    1997-03-01

    The Office of Air Traffic Systems Development (AUA) Program Master Plan : summarizes the management, development approach, and status of products and : services provided by the AUA organization to fulfill its role in supporting : National Airspace Sy...

  9. [Planning driven by health priorities. Master planning criteria].

    PubMed

    Tresserras, Ricard

    2008-12-01

    With the aim of responding to a number of problems detected in health plan evaluations, a new direction has been proposed in Catalonia which would lead to the improved unification of the strategic and operational approaches, and leadership. The master plans that tackle those health problems with the greatest impact were created along these lines. This article presents the most salient aspects of the master plans for oncology, circulatory diseases, mental health and addictions, immigration and the field of social healthcare. Their organisational structure, mission and functions are presented, commenting on the prioritisation of activities and the principal benchmark elements of the healthcare model in the definition of planning criteria for services incorporated into the Health Map. Finally, mention is made of the evaluation procedures. The in-depth study of priority settings has resulted in significant progress towards unifying health and service planning.

  10. Directions for the '80s: Educational Master Plan. San Francisco Community College District.

    ERIC Educational Resources Information Center

    Duncan-Hall, Tyra L., Ed.

    Designed to assist staff in the San Francisco Community College District (SFCCD) in synthesizing the trends, events and issues that are likely to influence educational programs and services, this master plan assesses the district's internal and external environments and describes the SFCCD's two-phase planning process. Chapter 1 discusses the…

  11. 2004 Strategic Master Plan for Higher Education. Update on Implementation

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2005

    2005-01-01

    The 2004 Strategic Master Plan for Higher Education identified clear and measurable goals that focused on outcomes rather than inputs alone. To reinforce this outcomes-based approach, the plan proposed that the state develop a new funding method to reward public colleges and universities for student success. Specifically, it proposed that the…

  12. Perspectives and Plans for Graduate Studies. 8. Anthropology 1974.

    ERIC Educational Resources Information Center

    Council of Ontario Universities, Toronto.

    At the present time there are two graduate programs in anthropology in Ontario. An examination of the 3-year plans submitted in 1972 revealed that several universities in Ontario were proposing master's work in anthropology. It was decided to place master's work in anthropology under provisional embargo until a "mini-planning assessment"…

  13. Challenges: The State Board of Community Colleges 1988 Master Plan.

    ERIC Educational Resources Information Center

    Florida State Board of Community Colleges, Tallahassee.

    The Florida State Board of Community Colleges' 1988 Master Plan presents current trends, challenges, and issues affecting the system in order to guide both local and state institutional development and legislation. The first section of the plan reviews population trends, indicating that: (1) population growth will be the most influential trend…

  14. Washington State Community College Capital Master Plan, 1985-91. Management Summary.

    ERIC Educational Resources Information Center

    Washington State Board for Community Coll. Education, Olympia.

    Designed for Washington State's decision makers and the trustees and administrators of the community college system, this report extracts information from the community college system's 1985-87 capital budget request and 1985-91 capital master plan to provide a brief description of the budget and plan. Introductory material discusses the…

  15. Guideline for the Comprehensive Campus Master Plan System.

    ERIC Educational Resources Information Center

    State Univ. System of Florida, Tallahassee.

    This document is a guideline for institutions in the Florida State University System to use as they comply with state mandates requiring them to develop campus master plans and land management plans. It supplements the minimum criteria in the state's Administrative Code. For each element the guide offers description of its purpose, data…

  16. Master Planning Guide for Instructional Objectives. Colorado State Plan for the Developmentally Disabled.

    ERIC Educational Resources Information Center

    Myers, Marvin L.; And Others

    Presented by the Master Planning Committee of the Colorado Department of Institutions and the Division of Developmental Disabilities is a behavior inventory of sequential skills in four areas basic to the normalization of developmentally disabled persons. Instructional objectives are listed in the following areas: physical, including perceptual…

  17. Colorado Academic Library Master Plan, Spring 1982.

    ERIC Educational Resources Information Center

    Breivik, Patricia Senn; And Others

    Based on a need to assess current library strengths and weaknesses and to project potential library roles in supporting higher education, this master plan makes a series of recommendations to Colorado's academic libraries. It is noted that the plan was endorsed by both the Colorado Commission on Higher Education and the Colorado State Department…

  18. [Preventing maternal and child malnutrition: the nutrition component of the Mesoamerican Health Initiative 2015].

    PubMed

    Rivera, Juan A; Martorell, Reynaldo; González, Wendy; Lutter, Chessa; Cossío, Teresa González de; Flores-Ayala, Rafael; Uauy, Ricardo; Delgado, Hernán

    2011-01-01

    To describe the regional master plan of nutrition to address maternal and child malnutrition in a 5- year period developed by the Nutrition Technical Group. The Nutrition Technical Group developed a situation analysis describing the main nutrition problems, policies and programs in Mesoamerica. The situation analysis and a literature review about effective interventions to address malnutrition were conducted to develop a nutrition master plan. The Nutrition Technical Group held various meetings to develop, discuss and validate the master plan. Theory of change identified problems and barriers, the actions to be developed, the changes and impacts expected. A package of interventions is proposed to reduce undernutrition and micronutrient deficiencies useful under different epidemiological contexts. The nutrition master plan provides a guideline of best practices that can be used for evidence-informed decision making and the development of national policies and programs to reduce malnutrition.

  19. Idaho Habitat/Natural Production Monitoring Part I, 1995 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall-Griswold, J.A.; Petrosky, C.E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring trends in juvenile spring and summer chinook salmon, Oncorhynchus tshawytscha, and steelhead trout, O. mykiss, populations in the Salmon, Clearwater, and lower Snake River drainages for the past 12 years. This work is the result of a program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric power plants on the Columbia River. Project 91-73, Idaho Natural Production Monitoring, consists of two subprojects: General Monitoring and Intensive Monitoring. This report updates and summarizes data through 1995 for the General Parr Monitoring (GPM)more » database to document status and trends of classes of wild and natural chinook salmon and steelhead trout populations. A total of 281 stream sections were sampled in 1995 to monitor trends in spring and summer chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss parr populations in Idaho. Percent carrying capacity and density estimates were summarized for 1985--1995 by different classes of fish: wild A-run steelhead trout, wild B-run steelhead trout, natural A-run steelhead trout, natural B-run steelhead trout, wild spring and summer chinook salmon, and natural spring and summer chinook salmon. The 1995 data were also summarized by subbasins as defined in Idaho Department of Fish and Game`s 1992--1996 Anadromous Fish Management Plan.« less

  20. Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhivov, Alexander Michael; Case, Michael Patrick; Jank, Reinhard

    This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

  1. On Being a Master Planner - A Step by Step Guide. From a Nationwide Study of Environmental Education Planning.

    ERIC Educational Resources Information Center

    Rocchio, Richard; Lee, Eve

    This guide demonstrates a new way of utilizing the planning process within a social movement context in view of developing a state master plan for environmental education. In addition the book serves as a guide to realistic planning, including models, definitions, and examples. The guide contains five parts: Part One - The background, Part Two -…

  2. As They Liked It: The Tragical-Comical-Pastoral Drama of Elizabethan Theatre. Curriculum Projects. The Huntington Theatre Company's Master Works Study in Shakespeare.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Shakespeare, this collection presents single lesson plans and unit plans for teaching Elizabethan drama. The collection presents 12 lesson plans (spanning one or a few days of instruction) and 15 unit plans (ranging over several weeks) suitable for secondary…

  3. "Review of the Sustained Yield Plan / Habitat Conservation Plan for the properties of The Pacific Lumber Company, Scotia Pacific Holding Company, and Salmon Creek Corporation"

    Treesearch

    Leslie M. Reid

    1998-01-01

    Downstream impacts to aquatic environments and property generally occur as cumulative watershed impacts, which are usually caused by changes in the transport of woody debris, water, and sediment through a watershed. The downstream cumulative impacts that are likely to accrue from implementation of the Sustained Yield Plan / Habitat Conservation Plan for the properties...

  4. Your Country 1 & 2!

    ERIC Educational Resources Information Center

    Kohnke, Lucas

    2011-01-01

    This article describes two lesson plans based on the theme: "Your Country," developed using Gilly Salmon's 5 step model in creating e-tivities. The lesson plan model contains five steps that include: (1) Access and motivation where learners will gain experience in using technology, relevant and authentic tasks which will provide explicit…

  5. U.S. response to a report of infectious salmon anemia virus in Western North America

    USGS Publications Warehouse

    Amos, Kevin H; Gustafson, Lori; Warg, Janet; Whaley, Janet; Purcell, Maureen K.; Rolland, Jill B.; Winton, James R.; Snekvik, Kevin; Meyers, Theodore; Stewart, Bruce; Kerwin, John; Blair, Marilyn; Bader, Joel; Evered, Joy

    2014-01-01

    Federal, state, and tribal fishery managers, as well as the general public and their elected representatives in the United States, were concerned when infectious salmon anemia virus (ISAV) was suspected for the first time in free-ranging Pacific Salmon collected from the coastal areas of British Columbia, Canada. This article documents how national and regional fishery managers and fish health specialists of the U.S. worked together and planned and implemented actions in response to the reported finding of ISAV in British Columbia. To date, the reports by Simon Fraser University remain unconfirmed and preliminary results from collaborative U.S. surveillance indicate that there is no evidence of ISAV in U.S. populations of free-ranging or marine-farmed salmonids on the west coast of North America.

  6. A Work Force for Environment and Energy. A Master Plan for Environmental/Energy Higher Education in Illinois.

    ERIC Educational Resources Information Center

    Illinois Inst. for Environmental Quality, Chicago.

    This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…

  7. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  8. Integration of Environmental Planning Into the Army Master Planning Process

    DTIC Science & Technology

    1992-10-01

    Creating and implementing 13 required component plans (and additional optional ones) can be unwieldy and time consuming. There is also a fair amount of...agencies. This review is to occur following internal installation review, but prior to review and approval by the Major Command (MACOM) or Headquarters...master planning regulations and guidelines is a lack of internal consistency. Through these revisions, the guidelines should be made entirely

  9. The Future of the Campus: Architecture and Master Planning Trends

    ERIC Educational Resources Information Center

    Coulson, Jonathan; Roberts, Paul; Taylor, Isabelle

    2015-01-01

    The article discusses current and likely future trends within the architecture and master planning of university campuses. It argues that higher education administrators must maximise the value of the campus to create physical environments that enhance the student experience.

  10. Integrating the transportation system with a university transportation master plan.

    DOT National Transportation Integrated Search

    2010-02-01

    Introduction and Research Objectives : -TxDOT commissioned TTI and the University of Texas at El Paso (UTEP) to perform a : research study of the integration of the transportation system with the UTEP : transportation master plan : -The objective is ...

  11. 18 CFR 708.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Snelling, Twin Cities, Minnesota. (c) Master Plan means the Upper Mississippi River System Comprehensive... Section 708.1 Conservation of Power and Water Resources WATER RESOURCES COUNCIL UPPER MISSISSIPPI RIVER BASIN COMMISSION: PUBLIC PARTICIPATION IN UPPER MISSISSIPPI RIVER SYSTEM MASTER PLAN § 708.1 Definitions...

  12. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  13. 45 CFR 2400.62 - Evidence of master's degree.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Evidence of master's degree. 2400.62 Section 2400... FELLOWSHIP FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Special Conditions § 2400.62 Evidence of master's... indicates that he or she has secured an approved master's degree as set forth in the Fellow's original Plan...

  14. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  15. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  16. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  17. 45 CFR 2400.62 - Evidence of master's degree.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Evidence of master's degree. 2400.62 Section 2400... FELLOWSHIP FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Special Conditions § 2400.62 Evidence of master's... indicates that he or she has secured an approved master's degree as set forth in the Fellow's original Plan...

  18. 45 CFR 2400.62 - Evidence of master's degree.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Evidence of master's degree. 2400.62 Section 2400... FELLOWSHIP FOUNDATION FELLOWSHIP PROGRAM REQUIREMENTS Special Conditions § 2400.62 Evidence of master's... indicates that he or she has secured an approved master's degree as set forth in the Fellow's original Plan...

  19. 46 CFR 196.80-1 - Master's responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Master's responsibility. 196.80-1 Section 196.80-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS OPERATIONS Explosive Handling Plan § 196.80-1 Master's responsibility. (a) It shall be the responsibility of the master...

  20. A Case Study in Master Planning the Learning Landscape Hub Concepts for the University at Buffalo

    ERIC Educational Resources Information Center

    Dugdale, Shirley; Torino, Roger; Felix, Elliot

    2009-01-01

    This case study describes concepts for three types of learning spaces that grew out of a Learning Landscape planning process. The process was part of a master plan study for the three campuses of the University at Buffalo. It involved research into user needs and aspirations about future pedagogy, development of learning space strategy,…

  1. Advanced On-the-Job Training System: Master Test Plan

    DTIC Science & Technology

    1990-05-01

    synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four crit’cal issues of system compliance...acceptance, performance and suitability. Within the MTP, these critical issues are assessed at subcomponent, component, and subsystem levels. 14. SUBJECT...Master Test Plan is synonymous with program evaluation and consists of a plan to evaluate AOTS with regard to assessment of the four critical issues

  2. 77 FR 50085 - Rookery Bay, FL and Kachemak Bay, AK National Estuarine Research Reserve Management Plan Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... priority issues including climate change and harvested species, such as salmon and shellfish. The reserve... land use changes affecting freshwater inflow, loss of native biodiversity, lack of public awareness and... change events. Since the last management plan, the reserve has constructed additional exhibits and a...

  3. Setting the stage for a sustainable Pacific salmon fisheries strategy

    USGS Publications Warehouse

    MacDonald, Donald D.; Steward, Cleveland R.; Knudsen, E. Eric; Knudsen, E. Eric; Steward, Cleveland R.; MacDonald, Donald D.; Williams, Jack E.; Reiser, Dudley W.

    1999-01-01

    Salmon and steelhead Oncorhynchus spp., have been keystone species for ecosystems and human cultures of the North American Pacific coast for cons. Yet, in the past century, many populations have been greatly diminished and some are now extinct-the result of a combination of factors, including habitat loss and degradation, overfishing, natural variability in salmon production, negative effects of artificial propagation, and weaknesses in institutional and regulatory structures. We argue that a major shift is required, from the egocentric environmental approach (wherein each part of the ecosystem is managed as a unit) to the ecocentric ecosystem approach (wherein all parts are integrated for management). A management framework is proposed that contains-for each management unit such as a watershed-four elements: management goals; management objectives, ecosystem indicators; and a coordinated action plan. We also describe the Sustainable Fisheries Strategy, a consultative process for developing an ecosystem-based approach toward achieving sustainable Pacific salmon and steelhead populations and fisheries. This book is one of three important underpinnings of the Strategy; the other two are the Strategy itself and a manual being developed to guide community-based programs embracing the principles of sustainable fisheries. This book contains important historical perspectives as well as numerous innovative ideas for moving toward ecosystem-oriented, sustainable management of Pacific salmon and steelhead.

  4. Doing Better with Less Energy: Energy Master Planning.

    ERIC Educational Resources Information Center

    Sieben, Stephen P.

    1982-01-01

    Energy savings through improved operation and maintenance of buildings and through implementation of energy conservation measures are discussed. Energy master planning--an approach to major retrofit and occupancy for existing college buildings, and energy conscious design and occupancy for new buildings--is advocated. (MLW)

  5. The Long Haul

    ERIC Educational Resources Information Center

    Erickson, Paul W.

    2009-01-01

    Most educational institutions have faced the decision whether to demolish, abandon or sell a facility. This article discusses how institutions can decide whether to renovate or build new. The author suggests to develop a campus- or districtwide master plan. A long-range master plan includes assessments of deferred maintenance, educational…

  6. Unmanned Aerial Vehicles Master Plan, 1994. Master Plan.

    DTIC Science & Technology

    1994-05-31

    Terminal SINCGARS = Single-Channel Ground and Airborne Radio System Figure 3-5 Maneuver Variant CONOPS I Psychological operations. deployment with early...650 KM DAT M 3 K (300 DESIRED) BEYOND FORWARD LINE OF OWN TROOPS (FLOT) APPROXIMATE RADIUS OF ACTION LEGEND ATARS = Advanced Tactical Air

  7. Re-Introduction of Lower Columbia River Chum Salmon into Duncan Creek, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hillson, Todd D.

    2002-10-01

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River chum as threatened under the auspices of the Endangered Species Act (ESA) in March of 1999 (64 FR 14508, March 25, 1999). The listing was in response to reduction in abundance from historical levels of more than half a million returning adults to fewer than 10,000 spawners present day (Johnson et al. 1997). Harvest, loss of habitat, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for the decline in this species in the Columbia River. The timing of seasonal changes in river flow and watermore » temperatures is perhaps the most critical factor in structuring the freshwater life history of chum salmon (Johnson et al. 1997). This is especially true of the population located directly below Bonneville Dam where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. The recovery strategy for Lower Columbia River chum as outlined in the Hatchery Genetic Management Plan (HGMP) for the Grays River project has four main tasks. First, determine if remnant populations of Lower Columbia River chum salmon exist in Lower Columbia River tributaries. Second, if such populations exist, develop stock-specific recovery plans that would involve habitat restoration including the creation of spawning refugias, supplementation if necessary and a habitat and fish monitoring and evaluation plan. If chum have been extirpated from previously utilized streams, develop re-introduction plans that utilize appropriate genetic donor stock(s) of Lower Columbia River chum salmon and integrate habitat improvement and fry-to-adult survival evaluations. Third, reduce the extinction risk to Grays River chum salmon population by randomly capturing adults in the basin for use in a supplementation program and reintroduction of Lower Columbia River chum salmon into the Chinook River basin. The Duncan Creek project has two goals: (1) re-introduction of chum into Duncan Creek by providing off channel high quality spawning and incubation areas and (2) to simultaneously evaluate natural re-colonization and a supplementation strategy where adults are collected and spawned artificially at a hatchery. The eggs from these artificial crossings are then either incubated at Duncan Creek or incubated and the fry reared at the hatchery to be released back into Duncan Creek. Tasks associated with the first goal include: (1) removing mud, sand and organics present in four of the creek branches and replace with gravels expected to provide maximum egg-to-fry survival rates to a depth of at least two feet; (2) armoring the sides of these channels to reduce importation of sediment by fish spawning on the margins; (3) planting native vegetation adjacent to these channels to stabilize the banks, trap silt and provide shade; (4) annual sampling of gravel in the spawning channels to detect changes in gravel composition and sedimentation levels.« less

  8. Does California's Master Plan Still Work?

    ERIC Educational Resources Information Center

    Burdman, Pamela

    2009-01-01

    For nearly 50 years, California's higher education system has been shaped by the tripartite division of the vaunted Master Plan. The 1960 document's bold vision of access and quality safeguarded a system of selective research universities (the University of California) and provided baccalaureate education through less-selective campuses (the…

  9. Test and Evaluation Master Plan (TEMP) for the Ports and Waterways Safety System (PAWSS) Project

    DOT National Transportation Integrated Search

    1997-01-01

    This document outlines the Test Concept for the Ports and Waterways Safety System (PAWSS) Project. This Test and Evaluation Master Plan (TEMP) purpose is to reduce risk and ensure the PAWSS project meets all System Specification and Statement of Work...

  10. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Master table of single and double sampling plans. 43.104 Section 43.104 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND...

  11. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  12. A Master Plan for the Evaluation of the Radio Component of the Fifth Education Project for the Royal Government of Thailand.

    ERIC Educational Resources Information Center

    Bates, Tony

    The master plan for evaluation presented in this report was developed by a UNESCO consultant as part of an agreement between the Government of Thailand and the United Nations Development Program for a project providing technical assistance for strengthening educational radio for schools and out-of-school education. Although this plan is restricted…

  13. The Master Plan for Florida Postsecondary Education. Supplement Number 3: Disabled Student Access to Postsecondary Education. Report and Recommendations of the Postsecondary Education Planning Commission.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Commission, Tallahassee.

    This third supplement to the Florida master plan for postsecondary education considers resources and barriers to education for disabled students and offers 21 recommendations. To provide a foundation to discuss the needs of disabled students, characteristics of the following major functional impairments are described: hearing impairment, learning…

  14. Report of Accomplishments under the Airport Improvement Program.

    DTIC Science & Technology

    1982-09-30

    Acquire snow removal equipment; conduct City of Portland feasibility study. Portland International (PRIMARY) Presque Isle 01 $ 15,840 Airport Master Plan...update to terminal City of Presque Isle area plan). Northern Maine Regional (PRIMARY) Presque Isle 02 $ 118,869 Rehabilitate terminal access road...City of Presque Isle Northern Maine Regional (PRIMARY) Rockland 01 $ 40,252 Airport Master Plan (update). Knox County Knox County Regional (COMMERCIAL

  15. Master Plan: The Introduction of Computer Science and Computer Related Instructional Programs, 1982-1985. Office of Instruction Publication Report No. 82-07.

    ERIC Educational Resources Information Center

    Veley, Victor F.; And Others

    This report presents a master plan for the development of computer science and computer-related programs at Los Angeles Trade-Technical College for 1982 through 1985. Introductory material outlines the main elements of the plan: to analyze existing computer courses, to create new courses in Laser Technology, Genetic Engineering, and Robotics; and…

  16. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  17. ENGINEERING ASPECTS OF COLLEGE PLANT DESIGN.

    ERIC Educational Resources Information Center

    DALTON, LIAM F.; SEGNER, MARVIN

    THE ARTICLE FOCUSES ON MECHANICAL AND ELECTRICAL FACILITIES THAT SHOULD BE CONSIDERED WHEN DEVELOPING A LONG RANGE MASTER PLAN. DEVELOPMENT OF THE MASTER PLAN SHOULD CONSIDER THE FOLLOWING--(1) COMPARATIVE FUEL COSTS, (2) POWER DISTRIBUTION, (3) HEATING PLANT, (4) CENTRAL PLANT SITE, (5) COOLING PLANT, (6) WATER SUPPLY, (7) STORM DRAINAGE, (8)…

  18. Reconfiguring a Campus--Fast.

    ERIC Educational Resources Information Center

    Hignite, Karla

    2003-01-01

    Describes the first phase of a master plan to expand the University of Alaska-Anchorage by purchasing a shopping mall and reconfiguring campus services to take advantage of the additional space. The master plan calls for eventually moving administration to the periphery of the campus and migrating academic programs to the campus center. (SLD)

  19. Are Your Schools Ready for the 21st Century?

    ERIC Educational Resources Information Center

    Vasilakis, John N.

    1990-01-01

    Although changes in instructional technology and population growth are the usual reasons school districts approach master planning as a tool for identifying and managing these changes, environmental concerns (like asbestos abatement and radon identification) play a role. A dozen tips for developing a master plan are provided. (MLH)

  20. San Jose/Evergreen Community College District: Governing Board's Strategic Master Plan.

    ERIC Educational Resources Information Center

    San Jose/Evergreen Community Coll. District, San Jose, CA.

    This report presents San Jose/Evergreen Community College District Governing Board's Strategic Master Plan. This report summarizes the district's mission statement, goal statements, and board priorities. The San Jose/Evergreen Community College District is committed to providing open access and opportunity for success to its multi-ethnic…

  1. Any Direction Home for California's Master Plan?

    ERIC Educational Resources Information Center

    Zingg, Paul J.

    2010-01-01

    In this article, the author talks about California's Master Plan for Higher Education, which offered a vision of access, affordability, and quality that was bold, inspiring, and attainable. It was predicated on the understanding that an educational system with such characteristics is essential to the cultural, political, and economic health of a…

  2. Traffic Trials

    ERIC Educational Resources Information Center

    Harknett, Thomas

    2007-01-01

    The decision to develop a transportation master plan for a school or university is often is a gradual process determined by changes that might have seemed insignificant in the beginning, but have combined to create problems that no longer can be ignored. Many circumstances can bring to light the need for a transportation master plan. In some…

  3. An Educational Master Plan for Austin Community College.

    ERIC Educational Resources Information Center

    Colvert, C. C.

    This seven-part report suggests a master plan for Austin Community College (ACC) through 1988-89 based on projections of enrollments, finances, and facility requirements. Section I details enrollment projections based on the proportional relationship between Travis County high school graduates and ACC enrollees. In addition, this section reviews…

  4. The Future of Tennessee: Higher Education 1987-1993.

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, Nashville.

    This master plan for higher education in Tennessee sketches a framework for the continued improvement of postsecondary institutions and emphasizes the critical links between higher education and other components of the state. A set of principles and achievement targets undergirding the master plan are outlined. Specific action is called for in…

  5. Decision Support in a Changing and Contentious World--Successfully Supporting the Development of a 50-year Comprehensive Coastal Master Plan in Louisiana

    NASA Astrophysics Data System (ADS)

    Groves, D.

    2014-12-01

    After the devastating 2005 hurricane season, Louisiana embarked on an ambitious and daunting effort to develop and implement a comprehensive Coastal Master Plan. The Master Plan sought to achieve two key goals simultaneously: reduce hurricane flood risk and halt the net conversion of its coastal landscape to open ocean. Numerous prior efforts to achieve these goals had been tried without significant success. In 2012, however, the Louisiana Coastal Protection and Restoration Authority (CPRA) produced a 50-year, $50 billion Master Plan. It had broad support from a diverse and often adversarial set of stakeholders, and it was unanimously passed by the Louisiana legislature. In contrast to other efforts, CPRA took an approach to planning called by the U.S. National Research Council as "deliberation with analysis". Specifically, CPRA used data, models, and decision support tools not to define an optimal or best strategy, but instead to support stakeholder dialogue and deliberations over alterative coastal management strategies. RAND researchers, with the support of CPRA and other collaborators, developed the planning tool at the center of this process. The CPRA planning tool synthesized large amounts of information about how the coast might evolve over time with and without different combinations of hundreds of different projects and programs. The tool helped CPRA propose alternative strategies that could achieve the State's goals while also highlighting to stakeholders the key tradeoffs among them. Importantly, this process helped bring diverse communities together to support a single vision and specific set of projects and programs to meet many of Louisiana's coastal water resources challenges. This presentation will describe the planning approach and decision support tools developed to support the Master Plan's participatory stakeholder process. The presentation will also highlight several important key takeaway messages that have broad applicability to other water resources planning efforts. Lastly, it will describe several on-going efforts in other parts of the U.S. that are employing this same approach.

  6. 77 FR 44214 - Essential Fish Habitat Components of Fishery Management Plans; 5-Year Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... herring, skates, Atlantic salmon, and Atlantic deep- sea red crab. The Council is seeking comments about removing the range of alternatives pertaining to deep-sea corals from this action and developing them as a... effects on deep-sea corals developed under the authority granted in the fishery management plan (FMP...

  7. Spring Chinook Salmon Oncorhynchus tshawytscha Supplementation in the Clearwater Subbasin ; Nez Perce Tribal Hatchery Monitoring and Evaluation Project, 2007 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Backman, Thomas; Sprague, Sherman; Bretz, Justin

    The Nez Perce Tribal Hatchery (NPTH) program has the following goals (BPA, et al., 1997): (1) Protect, mitigate, and enhance Clearwater Subbasin anadromous fish resources; (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater Subbasin; (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project initiation; (4) Sustain long-term fitness and genetic integrity of targeted fish populations; (5) Keep ecological and genetic impacts to non-target populations within acceptable limits; and (6) Promote Nez Perce Tribal management of Nez Perce Tribal Hatchery Facilities and productionmore » areas within Nez Perce Treaty lands. The NPTH program was designed to rear and release 1.4 million fall and 625,000 spring Chinook salmon. Construction of the central incubation and rearing facility NPTH and spring Chinook salmon acclimation facilities were completed in 2003 and the first full term NPTH releases occurred in 2004 (Brood Year 03). Monitoring and evaluation plans (Steward, 1996; Hesse and Cramer, 2000) were established to determine whether the Nez Perce Tribal Hatchery program is achieving its stated goals. The monitoring and evaluation action plan identifies the need for annual data collection and annual reporting. In addition, recurring 5-year program reviews will evaluate emerging trends and aid in the determination of the effectiveness of the NPTH program with recommendations to improve the program's implementation. This report covers the Migratory Year (MY) 2007 period of the NPTH Monitoring & Evaluation (M&E) program. There are three NPTH spring Chinook salmon treatment streams: Lolo Creek, Newsome Creek, and Meadow Creek. In 2007, Lolo Creek received 140,284 Brood Year (BY) 2006 acclimated pre-smolts at an average weight of 34.9 grams per fish, Newsome Creek received 77,317 BY 2006 acclimated pre-smolts at an average of 24.9 grams per fish, and Meadow Creek received 53,425 BY 2006 direct stream release parr at an average of 4.7 grams per fish. Natural and hatchery origin spring Chinook salmon pre-smolt emigrants were monitored from September - November 2006 and smolts from March-June 2007. Data on adult returns were collected from May-September. A suite of performance measures were calculated including total adult and spawner escapement, juvenile production, and survival probabilities. These measures were used to evaluate the effectiveness of supplementation and provide information on the capacity of the natural environment to assimilate and support supplemented salmon populations.« less

  8. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  9. 78 FR 74116 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ... for spring Chinook salmon, in the form of Hatchery and Genetic Management Plans (HGMPs), pursuant to... addenda for public review, comment, and submission of written data, views, arguments, or other relevant...

  10. Louisiana's 2017 Master Plan for a Sustainable Coast

    NASA Astrophysics Data System (ADS)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  11. Master Plan for Tennessee Schools, 1995: Preparing for the 21st Century.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, Nashville.

    The Tennessee State Legislature passed the Education Improvement Act (EIA) in 1992, which established the Basic Education Program (BEP) as the funding formula for providing adequate, equitable, and sustainable school funding. This document presents the 1995 Master Plan for Tennessee Schools, which focuses on the priority issues that must be…

  12. Leading the Way: Success. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    This is the second paper in the West Virginia State Higher Education Policy Commission's series concerning the major areas of the Commission's new master plan and compact process. Each paper elaborates on a particular theme sharing additional best practices and insights. It is the intention of the Commission that these additional resources assist…

  13. Leading the Way: Impact. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    This is the third and final paper in the Commission's series concerning the major areas of the Commission's new master plan and compact process. Each paper elaborates on a particular theme sharing additional best practices and insights. It is the intention of the Commission that these additional resources assist in fostering discourse among…

  14. Leading the Way: Access. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    The 2013-18 West Virginia Higher Education Policy Commission master plan, "Leading the Way: Access. Success. Impact" was developed to provide a programmatic framework and goals to enable the state's system of public four-year institutions to meet the educational needs of West Virginians. A state economy in flux with declining revenues…

  15. 20 CFR 632.11 - Designation of Native American grantees.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... or the first business day of the designation year. Such notices of intent to apply shall be submitted... Master Plan agreement or the Master Plan agreement is due to expire during the year of designation, the... and tribes, bands or groups which are being added to, or deleted from, the previous fiscal year's...

  16. Leading the Way: Access. Success. Impact. 2013-18 Master Plan

    ERIC Educational Resources Information Center

    West Virginia Higher Education Policy Commission, 2013

    2013-01-01

    The West Virginia Higher Education Policy Commission (Commission) has statutory responsibility for developing a five-year statewide master plan for higher education that sets forth system goals, objectives, and strategies and is aligned with meeting the goals of the state. The Legislature has identified in state code eight areas of special…

  17. Progress Report on the State of Texas Master Plan for Educational Technology, 2000-2003.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This progress report documents accomplishments and activities for September 2000 through August 2002 related to the State of Texas Master Plan for Educational Technology 2000-2003. The first section presents background, goals, and recommendations as adopted by the Education Technology Coordinating Council (ETCC) in December 1999. The second…

  18. California Master Plan for Special Education--An Update.

    ERIC Educational Resources Information Center

    Pillsbury, Charles A.; Maitland, Anne M.

    The report updates aspects of the 1977 report on California's Master Plan for Special Education. Reasons are sought for the intense debate over state funding for special education, which has substantially increased over recent years while special education enrollments have increased only modestly. In visits to nearly 100 local education agencies,…

  19. Master Plan for the City Colleges of Chicago.

    ERIC Educational Resources Information Center

    Westinghouse Learning Corp., Palo Alto, CA. Davis MacConnell Ralston Div.

    This Master Plan for the City Colleges of Chicago outlines their goals for the latter half of the 1970's. Thirty-two recommendations are made concerning six goal areas: community and people, programs, instruction, facilities, finance, and organization. Among the recommendations are the following: (1) by 1980 the city colleges should aim to serve…

  20. 45. Master plan of 4th floor, building 1, U.S. Naval ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Master plan of 4th floor, building 1, U.S. Naval supply activities, New York, Brooklyn, New York, public works department, March 2, 1953. Drawing #BK-S1-4. Scale 1/16=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY

  1. Development of a study design and implementation plan to estimate juvenile salmon survival in Lookout Point Reservoir and other reservoirs of the Willamette Project, western Oregon

    USGS Publications Warehouse

    Kock, Tobias J.; Perry, Russell W.; Monzyk, Fred R.; Pope, Adam C.; Plumb, John M.

    2016-12-23

    Survival estimates for juvenile salmon and steelhead fry in reservoirs impounded by high head dams are coveted data by resource managers.  However, this information is difficult to obtain because these fish are too small for tagging using conventional methods such as passive-integrated transponders or radio or acoustic transmitters.  We developed a study design and implementation plan to conduct a pilot evaluation that would assess the performance of two models for estimating fry survival in a field setting.  The first model is a staggered-release recovery model that was described by Skalski and others (2009) and Skalski (2016).  The second model is a parentage-based tagging N-mixture model that was developed and described in this document.  Both models are conceptually and statistically sound, but neither has been evaluated in the field.  In this document we provide an overview of a proposed study for 2017 in Lookout Point Reservoir, Oregon, that will evaluate survival of Chinook salmon fry using both models.  This approach will allow us to test each model and compare survival estimates, to determine model performance and better understand these study designs using field-collected data.

  2. Master plan nurse duty roster using the 0-1 goal programming technique

    NASA Astrophysics Data System (ADS)

    Ismail, Wan Rosmanira; Jenal, Ruzzakiah

    2013-04-01

    The scheduling of nurses is particularly challenging because of the nature of the work which is around the clock. In addition, inefficient duty roster can have an effect on the nurses well being as well as their job satisfaction. In nurse scheduling problem (NSP), nurses are generally allocated to periods of work over a specified time horizon. A typical length of the schedule varies from a few weeks to a month. The schedule will be consistently rebuilt after the specified time period and will result in a time-consuming task for the administrative staff involved. Moreover, the task becomes overwhelming when the staff needs to consider the previous duty rosters in order to maintain the quality of schedules. Therefore, this study suggests the development of a master plan for a nurse duty roster for approximately one year. The master plan starts with the development of a blue print for the nurse duty roster using a 0-1 goal programming technique. The appropriate working period for this blue print is formulated based on the number of night shifts and the number of required nurses for night shift per schedule. Subsequently, the blue print is repeated to complete the annual nurse duty roster. These newly developed procedures were then tested on several data sets. The test results found that the master plan has successfully distributed the annual workload evenly among nurses. In addition, the master plan allows nurses to arrange their career and social activities in advance.

  3. 77 FR 59039 - Proposed Collection; Comment Request for Revenue Procedure 2011-49

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... comments concerning Revenue Procedure 2011-49, Master and Prototype and Volume Submitter Plans. DATES... [email protected] . SUPPLEMENTARY INFORMATION: Title: Master and Prototype and Volume Submitter... and prototype and volume submitter revenue procedure sets forth the procedures for sponsors of master...

  4. Snake River Sockeye Salmon Captive Broodstock Program; Research Element, 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willard, Catherine; Hebdon, J. Lance; Castillo, Jason

    2004-06-01

    On November 20, 1991, the National Oceanic Atmospheric Administration listed Snake River sockeye salmon Oncorhynchus nerka as endangered under the Endangered Species Act of 1973. In 1991, the Shoshone-Bannock Tribes and Idaho Department of Fish and Game initiated the Snake River Sockeye Salmon Sawtooth Valley Project to conserve and rebuild populations in Idaho. Restoration efforts are focusing on Redfish, Pettit, and Alturas lakes within the Sawtooth Valley. The first release of hatchery-produced juvenile sockeye salmon from the captive broodstock program occurred in 1994. The first anadromous adult returns from the captive broodstock program were recorded in 1999 when six jacksmore » and one jill were captured at IDFG's Sawtooth Fish Hatchery. In 2002, progeny from the captive broodstock program were released using four strategies: age-0 presmolts were released to Alturas, Pettit, and Redfish lakes in August and to Pettit and Redfish lakes in October, age-1 smolts were released to Redfish Lake Creek in May, eyed-eggs were planted in Pettit Lake in December, and hatchery-produced and anadromous adult sockeye salmon were released to Redfish Lake for volitional spawning in September. Oncorhynchus nerka population monitoring was conducted on Redfish, Alturas, and Pettit lakes using a midwater trawl in September 2002. Age-0, age-1, and age-2 O. nerka were captured in Redfish Lake, and population abundance was estimated at 50,204 fish. Age-0, age-1, age-2, and age-3 kokanee were captured in Alturas Lake, and population abundance was estimated at 24,374 fish. Age-2 and age-3 O. nerka were captured in Pettit Lake, and population abundance was estimated at 18,328 fish. The ultimate goal of the Idaho Department of Fish and Game (IDFG) captive broodstock development and evaluation efforts is to recover sockeye salmon runs in Idaho waters. Recovery is defined as reestablishing sockeye salmon runs and providing for utilization of sockeye salmon and kokanee resources by anglers. The immediate project goal is to maintain this unique sockeye salmon population through captive broodstock technology and avoid species extinction. The project objectives are: (1) Develop captive broodstocks from Redfish Lake anadromous sockeye salmon. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program supplementation efforts. (4) Refine our ability to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, providing written activity reports and participation in essential program management and planning activities.« less

  5. Connecting Systems Model Design to Decision-Maker and Stakeholder Needs: Lessons from Louisiana's Coastal Master Plan

    NASA Astrophysics Data System (ADS)

    Fischbach, J. R.; Johnson, D.

    2017-12-01

    Louisiana's Comprehensive Master Plan for a Sustainable Coast is a 50-year plan designed to reduce flood risk and minimize land loss while allowing for the continued provision of economic and ecosystem services from this critical coastal region. Conceived in 2007 in response to hurricanes Katrina and Rita in 2005, the master plan is updated on a five-year planning cycle by the state's Coastal Protection and Restoration Authority (CPRA). Under the plan's middle-of-the-road (Medium) environmental scenario, the master plan is projected to reduce expected annual damage from storm surge flooding by approximately 65% relative to a future without action: from 5.3 billion to 2.2 billion in 2040, and from 12.1 billion to 3.7 billion in 2065. The Coastal Louisiana Risk Assessment model (CLARA) is used to estimate the risk reduction impacts of projects that have been considered for implementation as part of the plan. Evaluation of projects involves estimation of cost effectiveness in multiple future time periods and under a range of environmental uncertainties (e.g., the rates of sea level rise and land subsidence, changes in future hurricane intensity and frequency), operational uncertainties (e.g., system fragility), and economic uncertainties (e.g., patterns of population change and asset exposure). Between the 2012 and 2017 planning cycles, many improvements were made to the CLARA model. These included changes to the model's spatial resolution and definition of policy-relevant spatial units, an improved treatment of parametric uncertainty and uncertainty propagation between model components, the addition of a module to consider critical infrastructure exposure, and a new population growth model. CPRA also developed new scenarios for analysis in 2017 that were responsive to new scientific literature and to accommodate a new approach to modeling coastal morphology. In this talk, we discuss how CLARA has evolved over the 2012 and 2017 planning cycles in response to the needs of policy makers and CPRA managers. While changes will be illustrated through examples from Louisiana's 2017 Coastal Master Plan, we endeavor to provide generalizable and actionable insights about how modeling choices should be guided by the decision support process being used by planners.

  6. Research on Captive Broodstock Programs for Pacific Salmon; Assessment of Captive Broodstock Technologies, Annual Report 2002-2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berejikian, Barry

    The success of captive broodstock programs depends on high in-culture survival, appropriate development of the reproductive system, and the behavior and survival of cultured salmon after release, either as adults or juveniles. Continuing captive broodstock research designed to improve technology is being conducted to cover all major life history stages of Pacific salmon. Current velocity in rearing vessels had little if any effect on reproductive behavior of captively reared steelhead. However, males and females reared in high velocity vessels participated a greater number of spawning events than siblings reared in low velocity tanks. Observations of nesting females and associated malesmore » in a natural stream (Hamma Hamma River) were consistent with those observed in a controlled spawning channel. DNA pedigree analyses did not reveal significant differences in the numbers of fry produced by steelhead reared in high and low velocity vessels. To determine the critical period(s) for imprinting for sockeye salmon, juvenile salmon are being exposed to known odorants at key developmental stages. Subsequently they will be tested for development of long-term memories of these odorants. In 2002-2003, the efficacy of EOG analysis for assessing imprinting was demonstrated and will be applied in these and other behavioral and molecular tools in the current work plan. Results of these experiments will be important to determine the critical periods for imprinting for the offspring of captively-reared fish destined for release into natal rivers or lakes. By early August, the oocytes of all of Rapid River Hatchery chinook salmon females returning from the ocean had advanced to the tertiary yolk globule stage; whereas, only some of the captively reared Lemhi River females sampled had advanced to this stage, and the degree of advancement was not dependent on rearing temperature. The mean spawning time of captive Lemhi River females was 3-4 weeks after that of the Rapid River fish. Captive Lemhi River females produced smaller and fewer eggs than the Rapid River females; however, relative fecundity was higher than that of the Rapid River fish. Female coho salmon that ceased or slowed oocyte development in the spring had lower body growth from the previous August onward compared with females that continued oocyte growth. This indicates that growth during the late summer and fall, one year prior to spawning, can determine the decision to mature the following spring. Therefore it is important to maintain the growth of broodstock during the summer/fall period to ensure the continuation of ovary development in the subsequent spring. A combined whole cell vaccine of Renogen with killed R. salmoninarum strain MT239 may be effective in reducing the occurrence of BKD during the period immediately after seawater transfer, but not in yearling seawater-adapted chinook salmon. Control of BKD is likely to require an integrated disease management plan, utilizing three components, namely broodstock segregation, antibiotics, and vaccination. Vaccine results incorporated with antibiotic treatment will be used to work toward an integrated disease management plan to help to reduce the cycle of BKD transmission in the captive stocks to increase survival safely. Patterns of estimated survival in one chinook salmon stock (Grovers Creek) were generally consistent with inbreeding depression: progeny of fish that were full siblings (approximate increment in F of 0.25) survived to return at much lower rates than did progeny of fish that were half siblings (F {approx} 0.125) or unrelated individuals (F {approx} 0). Growth at sea of Grovers Creek Hatchery stock study fish was lower than that of UWH stock fish. Among the inbreeding groups alone, no clear differences in growth were detectable. However, preliminary results suggest the general pattern of growth was opposite that expected if inbreeding depression reduced growth: the highest growth was in progeny of related parents.« less

  7. Research on Captive Broodstock Programs for Pacific Salmon, 2002-2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berejikian, Barry A.

    The success of captive broodstock programs depends on high in-culture survival, appropriate development of the reproductive system, and the behavior and survival of cultured salmon after release, either as adults or juveniles. Continuing captive broodstock research designed to improve technology is being conducted to cover all major life history stages of Pacific salmon. Current velocity in rearing vessels had little if any effect on reproductive behavior of captively reared steelhead. However, males and females reared in high velocity vessels participated a greater number of spawning events than siblings reared in low velocity tanks. Observations of nesting females and associated malesmore » in a natural stream (Hamma Hamma River) were consistent with those observed in a controlled spawning channel. DNA pedigree analyses did not reveal significant differences in the numbers of fry produced by steelhead reared in high and low velocity vessels. To determine the critical period(s) for imprinting for sockeye salmon, juvenile salmon are being exposed to known odorants at key developmental stages. Subsequently they will be tested for development of long-term memories of these odorants. In 2002-2003, the efficacy of EOG analysis for assessing imprinting was demonstrated and will be applied in these and other behavioral and molecular tools in the current work plan. Results of these experiments will be important to determine the critical periods for imprinting for the offspring of captively-reared fish destined for release into natal rivers or lakes. By early August, the oocytes of all of Rapid River Hatchery chinook salmon females returning from the ocean had advanced to the tertiary yolk globule stage; whereas, only some of the captively reared Lemhi River females sampled had advanced to this stage, and the degree of advancement was not dependent on rearing temperature. The mean spawning time of captive Lemhi River females was 3-4 weeks after that of the Rapid River fish. Captive Lemhi River females produced smaller and fewer eggs than the Rapid River females; however, relative fecundity was higher than that of the Rapid River fish. Female coho salmon that ceased or slowed oocyte development in the spring had lower body growth from the previous August onward compared with females that continued oocyte growth. This indicates that growth during the late summer and fall, one year prior to spawning, can determine the decision to mature the following spring. Therefore it is important to maintain the growth of broodstock during the summer/fall period to ensure the continuation of ovary development in the subsequent spring. A combined whole cell vaccine of Renogen with killed R. salmoninarum strain MT239 may be effective in reducing the occurrence of BKD during the period immediately after seawater transfer, but not in yearling seawater-adapted chinook salmon. Control of BKD is likely to require an integrated disease management plan, utilizing three components, namely broodstock segregation, antibiotics, and vaccination. Vaccine results incorporated with antibiotic treatment will be used to work toward an integrated disease management plan to help to reduce the cycle of BKD transmission in the captive stocks to increase survival safely. Patterns of estimated survival in one chinook salmon stock (Grovers Creek)were generally consistent with inbreeding depression: progeny of fish that were full siblings (approximate increment in F of 0.25) survived to return at much lower rates than did progeny of fish that were half siblings (F {approx} 0.125) or unrelated individuals (F {approx} 0). Growth at sea of Grovers Creek Hatchery stock study fish was lower than that of UWH stock fish. Among the inbreeding groups alone, no clear differences in growth were detectable. However, preliminary results suggest the general pattern of growth was opposite that expected if inbreeding depression reduced growth: the highest growth was in progeny of related parents.« less

  8. Second Annual Review of the Master Plan for Postsecondary Education in Louisiana: 2011

    ERIC Educational Resources Information Center

    Louisiana Board of Regents, 2013

    2013-01-01

    In 2011, the Board of Regents (BoR), through the development and implementation of the Master Plan, advanced its vision for the future of postsecondary education by adopting the following three broad goals: (1) Increase the educational attainment of the State's adult population to the Southern Regional Education Board (SREB) States' average by…

  9. Master Plan for Tennessee Schools: Preparing for the 21st Century.

    ERIC Educational Resources Information Center

    Tennessee State Board of Education, Nashville.

    The Education Improvement Act (EIA) was passed in Tennessee in 1992. It established the Basic Education Program (BEP) as the funding formula used to provide adequate, equitable, and sustainable school funding. The 1997 master plan is consistent with the national Goals 2000 legislation and addresses each of the eight national goals. The plan…

  10. California's "Gold Standard" for Higher Education Falls Upon Hard Times

    ERIC Educational Resources Information Center

    Keller, Josh

    2009-01-01

    Few documents in higher education have enjoyed the influence or longevity of the California Master Plan for Higher Education, the 1960 law that transformed the state's public colleges and served as a blueprint for public systems across the country. Even today, almost 50 years after it was written, the master plan retains a mythic status in…

  11. 75 FR 53735 - Notice of Final Federal Agency Actions on East Lake Sammamish Master Plan Trail in King County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... on East Lake Sammamish Master Plan Trail in King County, WA AGENCY: Federal Highway Administration... enhancement project, the East Lake Sammamish Trail, starting at Gilman Boulevard in Issaquah, Washington and ending at Bear Creek Trail in Redmond, Washington. Those actions grant licenses, permits, and approvals...

  12. Long-Range Master Plan, 1986-1989. Black Hawk College, East Campus.

    ERIC Educational Resources Information Center

    Black Hawk Coll. Kewanee, IL. East Campus.

    This 3-year strategic long-range master plan states the intended direction of Black Hawk College-East Campus (BHC) in Illinois for October 1986 to October 1989. The report begins with a series of graphs offering various service area comparisons between rural Illinois residents and BHE students; enrollment data; and student demographics. Next, the…

  13. Third Annual Review of the Master Plan for Postsecondary Education in Louisiana: 2011

    ERIC Educational Resources Information Center

    Louisiana Board of Regents, 2014

    2014-01-01

    In 2011, the Board of Regents (BoR), through the development and implementation of the Master Plan, advanced its vision for the future of postsecondary education by adopting the following three broad goals: (1) Increase the educational attainment of the State's adult population to the Southern Regional Education Board (SREB) States' average by…

  14. A Master Plan for the Development of Vocational-Technical Education In New Mexico.

    ERIC Educational Resources Information Center

    Sterling Inst., Washington, DC.

    This master plan for vocational education in New Mexico is the result of a study conducted by professional education consultants. The following areas were examined during the study: (1) New Mexico's present manpower problems, (2) market trends of future industrial potential, (3) state resources capable of attracting new industry, (4) adequacy of…

  15. Master Plan for Educational Facilities: Midland Park, Bergen County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Midland Park, New Jersey, is a small borough with an estimated population in 1978 of 8,500 persons. The first part of the master plan for educational facilities in the area begins with an overview using maps to illustrate characteristics including its topography, relationship to key population centers and major transportation routes, boundaries,…

  16. Access and Equity: California Master Plan for Higher Education and Disadvantaged Student Success

    ERIC Educational Resources Information Center

    Davis, Kevin P.

    2015-01-01

    The California Master Plan for Higher Education sets a policy objective of equity through access to higher education. The California State University system is California's primary institution for providing the social mobility that accompanies a four-year college degree. The purpose of this study is to examine the education lifecycle outcomes for…

  17. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  18. The Future of Public Undergraduate Education in California.

    ERIC Educational Resources Information Center

    Shires, Michael A.

    This report investigates whether the state of California can return to the levels of access to higher education envisioned in its Master Plan adopted in 1960. Chapter 1 is an introduction which discusses the state's commitment to access, the structure of the educational sector under the Master plan, the effects of the recession of the early 1990s…

  19. 106. Air defense command "master plan", base map," RCA Service ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    106. Air defense command "master plan", base map," RCA Service Company tab no. F-1, sheet 1 of 2, dated 22 October, 1965. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK

  20. The Structure of the University Network: From the Soviet to Russian "Master Plan"

    ERIC Educational Resources Information Center

    Kuzminov, Ia. I.; Semenov, D. S.; Froumin, I. D.

    2015-01-01

    The authors discuss the underpinnings of structural analysis in the higher education system. The article justifies why it focuses on specific labor market segments and the nature of the university's basic product as grounds for proposing a typology and groups of institutions. A Soviet "master plan" is reconstructed on the basis of the…

  1. Master Plan for Educational Facilities: Garwood, Union County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Garwood, New Jersey, is a small borough of 0.69 square miles with an estimated population in 1978 of 4,856 persons. This master plan for educational facilities begins with an overview of the district that describes its beginnings as an industrial community. A number of maps illustrate characteristics of the area including its topography,…

  2. Fourth Annual Review of the Master Plan for Postsecondary Education in Louisiana: 2011

    ERIC Educational Resources Information Center

    Louisiana Board of Regents, 2015

    2015-01-01

    In 2011, the Louisiana Board of Regents (BoR), through the development and implementation of the Master Plan, advanced its vision for the future of postsecondary education by adopting the following three broad goals: (1) Increase the educational attainment of the State's adult population to the Southern Regional Education Board (SREB) States'…

  3. A Process-Based Assessment for Watershed Restoration Planning, Chehalis River Basin, USA

    NASA Astrophysics Data System (ADS)

    Beechie, T. J.; Thompson, J.; Seixas, G.; Fogel, C.; Hall, J.; Chamberlin, J.; Kiffney, P.; Pollock, M. M.; Pess, G. R.

    2016-12-01

    Three key questions in identifying and prioritizing river restoration are: (1) How have habitats changed?, (2) What are the causes of those habitat changes?, and (3) How of those changes affected the species of interest? To answer these questions and assist aquatic habitat restoration planning in the Chehalis River basin, USA, we quantified habitat changes across the river network from headwaters to the estuary. We estimated historical habitat capacity to support salmonids using a combination of historical assessments, reference sites, and models. We also estimated current capacity from recent or newly created data sets. We found that losses of floodplain habitats and beaver ponds were substantial, while the estuary was less modified. Both tributary and main channel habitats—while modified—did not show particularly large habitat changes. Assessments of key processes that form and sustain habitats indicate that riparian functions (shading and wood recruitment) have been significantly altered, although peak and low flows have also been altered in some locations. The next step is to link our habitat assessments to salmon life-cycle models to evaluate which life stages and habitat types currently constrain population sizes of spring and fall Chinook salmon, coho salmon, and steelhead. By comparing model runs that represent different components of habitat losses identified in the analysis above, life-cycle models help identify which habitat losses have most impacted each species and population. This assessment will indicate which habitat types provide the greatest restoration potential, and help define a guiding vision for restoration efforts. Future analyses may include development and evaluation of alternative restoration scenarios, including different climate change scenarios, to refine our understanding of which restoration actions provide the greatest benefit to a salmon population.

  4. 45 CFR 2400.42 - Approval of Plan of Study.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-time basis lead to a master's degree in history or political science, the degree of Master of Arts in Teaching in history or political science, or a related master's degree in education that permits a concentration in American history, American government, social studies, or political science; (b) Include...

  5. 75 FR 25204 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... can obtain an electronic copy (i.e., CD-ROM) from Andrea Berry by calling (866) 300-2948 or by e-mailing a request to [email protected] with the subject line ``CD-ROM Request for CCC coho salmon...

  6. Patterns of coho salmon size and survival within a stream network

    EPA Science Inventory

    Effective habitat restoration planning requires correctly anticipating demographic responses to altered habitats. Network-scale investigations of habitat-specific growth and survival of juvenile salmonids have provided critical insights that can now better inform and help priori...

  7. Master Plan Jakarta, Indonesia: The Giant Seawall and the need for structural treatment of municipal waste water.

    PubMed

    van der Wulp, Simon A; Dsikowitzky, Larissa; Hesse, Karl Jürgen; Schwarzbauer, Jan

    2016-09-30

    In order to take actions against the annual flooding in Jakarta, the construction of a Giant Seawall has been proposed in the Master Plan for National Capital Integrated Coastal Development. The seawall provides a combination of technical solutions against flooding, but these will heavily modify the mass transports in the near-coastal area of Jakarta Bay. This study presents numerical simulations of river flux of total nitrogen and N,N-diethyl-m-toluamide, a molecular tracer for municipal waste water for similar scenarios as described in the Master Plan. Model results demonstrate a strong accumulation of municipal wastes and nutrients in the planned reservoirs to extremely high levels which will result in drastic adverse eutrophication effects if the treatment of municipal waste water is not dealt with in the same priority as the construction of the Giant Seawall. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. The combined impact of land use change and aquaculture on sediment and water quality in oligotrophic Lake Rupanco (North Patagonia, Chile, 40.8°S).

    PubMed

    León-Muñoz, Jorge; Echeverría, Cristian; Marcé, Rafael; Riss, Wolfgang; Sherman, Bradford; Iriarte, Jose Luis

    2013-10-15

    Water and sediment quality in North Patagonia's large, oligotrophic lakes are expected to suffer as native forest continues to be fragmented and degraded by its conversion to cropping and pasture land uses. These changes in land use are expected to increase diffuse nutrient loads to the region's lakes. In addition, these lakes are home to the world's second largest salmon aquaculture industry which provides additional point sources of nutrients within the lakes. We studied the combined influences of land use change and salmon farming on the nutrient concentrations in a North Patagonian lake (Lake Rupanco, 233 km(2) water surface, 163 m average depth) in four sub-watersheds ranging in disturbance from near-pristine forest to 53% converted to cropping and pasture. Nitrogen exports from the tributary sub-watersheds increased from 33 kg TN/km(2)/y to 621 kg TN/km(2)/y as the proportion of crop and pasture land increased. The combined nutrient load from land use change and salmon farming has led to significant differences in the nitrogen concentrations of the lake's water column and sediments in the near-shore zones across the lake. Total nitrogen concentrations in the sediments varied from 37 ± 18 mg/kg in near-pristine sub-watersheds without salmon farming to 6400 ± 698 mg/kg where the sub-watershed was dominated by crop and pasture lands combined with the presence of salmon farming. These results demonstrate the importance of considering the impacts of both salmon farming and land use on water and sediment quality for future environmental planning, management and decision making. Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. Snake River Sockeye Salmon Captive Broodstock Program Hatchery Element : Project Progress Report 2007 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baker, Dan J.; Heindel, Jeff A.; Green, Daniel G.

    2008-12-17

    Numbers of Snake River sockeye salmon Oncorhynchus nerka have declined dramatically in recent years. In Idaho, only the lakes of the upper Salmon River (Sawtooth Valley) remain as potential sources of production (Figure 1). Historically, five Sawtooth Valley lakes (Redfish, Alturas, Pettit, Stanley, and Yellowbelly) supported sockeye salmon (Bjornn et al. 1968; Chapman et al. 1990). Currently, only Redfish Lake receives a remnant anadromous run. On April 2, 1990, the National Oceanic and Atmospheric Administration Fisheries Service (NOAA - formerly National Marine Fisheries Service) received a petition from the Shoshone-Bannock Tribes (SBT) to list Snake River sockeye salmon as endangeredmore » under the United States Endangered Species Act (ESA) of 1973. On November 20, 1991, NOAA declared Snake River sockeye salmon endangered. In 1991, the SBT, along with the Idaho Department of Fish & Game (IDFG), initiated the Snake River Sockeye Salmon Sawtooth Valley Project (Sawtooth Valley Project) with funding from the Bonneville Power Administration (BPA). The goal of this program is to conserve genetic resources and to rebuild Snake River sockeye salmon populations in Idaho. Coordination of this effort is carried out under the guidance of the Stanley Basin Sockeye Technical Oversight Committee (SBSTOC), a team of biologists representing the agencies involved in the recovery and management of Snake River sockeye salmon. National Oceanic and Atmospheric Administration Fisheries Service ESA Permit Nos. 1120, 1124, and 1481 authorize IDFG to conduct scientific research on listed Snake River sockeye salmon. Initial steps to recover the species involved the establishment of captive broodstocks at the Eagle Fish Hatchery in Idaho and at NOAA facilities in Washington State (for a review, see Flagg 1993; Johnson 1993; Flagg and McAuley 1994; Kline 1994; Johnson and Pravecek 1995; Kline and Younk 1995; Flagg et al. 1996; Johnson and Pravecek 1996; Kline and Lamansky 1997; Pravecek and Johnson 1997; Pravecek and Kline 1998; Kline and Heindel 1999; Hebdon et al. 2000; Flagg et al. 2001; Kline and Willard 2001; Frost et al. 2002; Hebdon et al. 2002; Hebdon et al. 2003; Kline et al. 2003a; Kline et al. 2003b; Willard et al. 2003a; Willard et al. 2003b; Baker et al. 2004; Baker et al. 2005; Willard et al. 2005; Baker et al. 2006; Plaster et al. 2006; Baker et al. 2007). The immediate goal of the program is to utilize captive broodstock technology to conserve the population's unique genetics. Long-term goals include increasing the number of individuals in the population to address delisting criteria and to provide sport and treaty harvest opportunity. (1) Develop captive broodstocks from Redfish Lake sockeye salmon, culture broodstocks and produce progeny for reintroduction. (2) Determine the contribution hatchery-produced sockeye salmon make toward avoiding population extinction and increasing population abundance. (3) Describe O. nerka population characteristics for Sawtooth Valley lakes in relation to carrying capacity and broodstock program reintroduction efforts. (4) Utilize genetic analysis to discern the origin of wild and broodstock sockeye salmon to provide maximum effectiveness in their utilization within the broodstock program. (5) Transfer technology through participation in the technical oversight committee process, provide written activity reports, and participate in essential program management and planning activities. Idaho Department of Fish and Game's participation in the Snake River Sockeye Salmon Captive Broodstock Program includes two areas of effort: (1) sockeye salmon captive broodstock culture, and (2) sockeye salmon research and evaluations. Although objectives and tasks from both components overlap and contribute to achieving the same goals, work directly related to sockeye salmon captive broodstock research and enhancement will appear under a separate cover. Research and enhancement activities associated with Snake River sockeye salmon are permitted under NOAA permit numbers 1120, 1124, and 1481. This report details fish culture information collected between January 1 and December 31, 2007.« less

  10. Validation of Modifications to the ANSR for Listeria Method for Improved Internal Positive Control Performance.

    PubMed

    Alles, Susan; Meister, Evan; Hosking, Edan; Tovar, Eric; Shaulis, Rebecca; Schonfeld, Mark; Zhang, Lei; Li, Lin; Biswas, Preetha; Mozola, Mark; Donofrio, Robert; Chen, Yi

    2018-03-01

    A study was conducted to validate a minor reagent formulation change to the ANSR for Listeria method, Performance Tested MethodSM 101202. This change involves increasing the master mix volume prelyophilization by 40% and addition of salmon sperm DNA (nontarget DNA) to the master mix. These changes improve the robustness of the internal positive control response and reduce the possibility of obtaining invalid results due to weak-positive control curves. When three foods (hot dogs, Mexican-style cheese, and cantaloupe) and sponge samples taken from a stainless steel surface were tested, no significant differences in performance between the ANSR and U.S. Food and Drug Administration Bacteriological Analytical Manual or U.S. Department of Agriculture-Food Safety and Inspection Service Microbiology Laboratory Guidebook reference culture procedures were observed for any of the matrixes as determined by probability of detection analysis. Inclusivity and exclusivity testing yielded 100% expected results for target and nontarget bacteria. Accelerated stability testing was carried out over a 7 week period and showed no decrease in assay performance over time.

  11. Implementation of the Master Plan for Statewide Professional Staff Development for 2012-2013: An Evaluation Study

    ERIC Educational Resources Information Center

    Hammer, Patricia Cahape

    2014-01-01

    In this evaluation, as in previous years, four main aspects of the implementation of the West Virginia Board of Education's Master Plan for Statewide Professional Development were examined: (a) basic information reported by providers about the size and scope of the effort, including attendance, and adherence to the newly adopted standards for…

  12. Academic Master Planning in the California State University and Colleges 1972-73 through 1976-77.

    ERIC Educational Resources Information Center

    California State Colleges, Los Angeles. Div. of Academic Planning.

    The California State University and Colleges have devised a system of academic Master Planning that allows them to design curricular models for the future while at the same time evaluating their present curricular offerings. It provides for a continual curricular evaluation cycle for each campus within the system. The materials contained in this…

  13. Three-Year College Discovery Master Plan, Bronx Community College, 1998-2001, Parts I-III.

    ERIC Educational Resources Information Center

    Smith, Shirley; Santa Rita, Emilio

    Bronx Community College created a three-year College Discovery (CD) master plan for 1998-2001 to help restructure its counseling programs and support services and enable CD students to acquire an associate's degree level of education. The first area of restructuring is in the role of the director of College Discovery and Counseling. General…

  14. Postsecondary Attainment in the Decade of Decision: The Master Plan for Tennessee Postsecondary Education 2015-2025

    ERIC Educational Resources Information Center

    Tennessee Higher Education Commission, 2015

    2015-01-01

    The Tennessee Higher Education Commission (THEC) was charged by state statute with developing a statewide Master Plan for the future development of public universities, community colleges, and colleges of applied technology, with input from the Board of Regents and the University of Tennessee Board of Trustees. The overriding function of the Plan…

  15. Challenges, Realities, Strategies: The Master Plan for Florida Postsecondary Education for the 21st Century.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    A new master plan for higher education in Florida is presented which focuses on the central challenges facing the state and its higher education institutions. The following sections address three key challenges and suggest strategies to help policymakers and governing boards promote positive change. The section on the challenge of improved use of…

  16. Master Plan for Educational Facilities: City of Clifton, Passaic County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    Clifton, New Jersey, has a land area of just under 12 square miles with a population estimated in 1976 to be 83,592 persons. This master plan for educational facilities begins with an overview of the district and its historical background. A number of maps illustrate characteristics of the area, including its topography, relationship to key…

  17. And the Sky Is Grey: The Ambivalent Outcomes of the California Master Plan for Higher Education

    ERIC Educational Resources Information Center

    Marginson, Simon

    2018-01-01

    In the 1960 Master Plan for Higher Education, California in the United States famously combined the principles of excellence and access within a steep three-tiered system of Higher Education. It fashioned the world's strongest system of public research universities, while creating an open access system that brought college to millions of American…

  18. Marketing Plan for the Naval Postgraduate School Master of Business Administration to the Navy Unrestricted Line Community

    DTIC Science & Technology

    2004-06-01

    represented in the Defense-Focused MBA program at the School of Business and Public Policy ( BPP ), Naval Postgraduate School (NPS). The authors believe...initial goal of this Master of Business Administration (MBA) Application Project was to assist the Graduate School of Business and Public Policy ( BPP ) in...that the BPP has a strategic plan with clear and concise goals including marketing goals, but has no marketing plan for the resident MBA program

  19. Coeur d'Alene Tribal Production Facility, Volume I of III, 2002-2003 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anders, Paul

    2003-01-01

    In fulfillment of the NWPPC's 3-Step Process for the implementation of new hatcheries in the Columbia Basin, this Step 1 submission package to the Council includes four items: (1) Cover letter from the Coeur d'Alene Tribe, Interdisciplinary Team Chair, and the USFWS; (2) References to key information (Attachments 1-4); (3) The updated Master Plan for the Tribe's native cutthroat restoration project; and (4) Appendices. In support of the Master Plan submitted by the Coeur d'Alene Tribe the reference chart (Item 2) was developed to allow reviewers to quickly access information necessary for accurate peer review. The Northwest Power Planning Councilmore » identified pertinent issues to be addressed in the master planning process for new artificial production facilities. References to this key information are provided in three attachments: (1) NWPPC Program language regarding the Master Planning Process, (2) Questions Identified in the September 1997 Council Policy, and (3) Program language identified by the Council's Independent Scientific Review Panel (ISRP). To meet the need for off-site mitigation for fish losses on the mainstem Columbia River, in a manner consistent with the objectives of the Council's Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operation, and maintenance of a trout production facility located adjacent to Coeur d'Alene Lake on the Coeur d'Alene Indian Reservation. The updated Master Plan (Item 3) represents the needs associated with the re-evaluation of the Coeur d'Alene Tribe's Trout Production Facility (No.199004402). This plan addresses issues and concerns expressed by the NWPPC as part of the issue summary for the Mountain Columbia provincial review, and the 3-step hatchery review process. Finally, item 4 (Appendices) documents the 3-Step process correspondence to date between the Coeur d'Alene Tribe and additional relevant entities. Item 4 provides a chronological account of previous ISRP reviews, official Coeur d'Alene fisheries program responses to a series of ISRP reviews, master planning documentation, and annual reports dating back to 1990. Collectively, the materials provided by the Coeur d'Alene Tribe in this Step-1 submission package comprehensively assesses key research, habitat improvement activities, and hatchery production issues to best protect and enhance native cutthroat trout populations and the historically and culturally important tribal fisheries they support.« less

  20. Applied Ecosystem Analysis - Background : EDT the Ecosystem Diagnosis and Treatment Method.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mobrand, Lars E.

    1996-05-01

    This volume consists of eight separate reports. We present them as background to the Ecosystem Diagnosis and Treatment (EDT) methodology. They are a selection from publications, white papers, and presentations prepared over the past two years. Some of the papers are previously published, others are currently being prepared for publication. In the early to mid 1980`s the concern for failure of both natural and hatchery production of Columbia river salmon populations was widespread. The concept of supplementation was proposed as an alternative solution that would integrate artificial propagation with natural production. In response to the growing expectations placed upon themore » supplementation tool, a project called Regional Assessment of Supplementation Project (RASP) was initiated in 1990. The charge of RASP was to define supplementation and to develop guidelines for when, where and how it would be the appropriate solution to salmon enhancement in the Columbia basin. The RASP developed a definition of supplementation and a set of guidelines for planning salmon enhancement efforts which required consideration of all factors affecting salmon populations, including environmental, genetic, and ecological variables. The results of RASP led to a conclusion that salmon issues needed to be addressed in a manner that was consistent with an ecosystem approach. If the limitations and potentials of supplementation or any other management tool were to be fully understood it would have to be within the context of a broadly integrated approach - thus the Ecosystem Diagnosis and Treatment (EDT) method was born.« less

  1. Oxbow Fish Hatchery Snake River Sockeye Salmon Smolt Program, 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Banks, Duane D.

    2009-11-14

    This contract proposal is in response to the Federal Columbia River Power System Biological Opinion Implementation Plan/Update Proposed Action (UPA) associated with increasing the number of Snake River sockeye smolts by 150,000. To accomplish this proposal the cooperation and efforts of three government entities has been planned (e.g., Idaho Department of Fish and Game (IDFG), Oregon Department of Fish and Wildlife (ODFW), and the National Marine Fisheries Service (NMFS)). Improvements at the IDFG Eagle Fish Hatchery and NMFS Burley Creek Hatchery will focus on increasing sockeye salmon captive broodstock and egg production. Improvements at the ODFW Oxbow Fish Hatchery willmore » be made to accommodate the incubation, hatching and rearing of 150,000 sockeye salmon smolts for release into Idaho's Sawtooth Valley, Upper Salmon River near IDFG's Sawtooth Fish Hatchery and/or Redfish Lake Creek 1.4 km downstream of Redfish Lake. Modifications to Oxbow Fish Hatchery (ODFW) will include retro-fit existing pond drains so pond cleaning effluent water can be routed to the pollution abatement pond, and modifications to the abatement pond. Also included in this project as an added phase, was the rerouting of the hatchery building effluent water to meet state DEQ guidelines for the use of formalin to treat salmonid eggs. Some additional funding for the described Oxbow Hatchery modifications will come from Mitchell Act Funding. All personnel costs associated with this project will come from Mitchell Act funding. Due to heavy work load issues, being under staffed, and two emergency projects in the spring and summer of 2006, ODFW engineers were not able to complete all plans and get them out for bid in 2006. As a result of these circumstances retro-fitting pond drains and modifications to the abatement pond was carried over into fiscal year 2007-2008. A no cost time extension to the contract was approved by BPA. The format for this report will follow the standard format for Statement of Work Report (SOW), which includes sub-categories Work Element (WE), and within the WE the Milestone Titles.« less

  2. Preserving the Master Plan: What Is To Be Done in a New Epoch of More Limited Growth of Resources? Report 94-3.

    ERIC Educational Resources Information Center

    Kerr, Clark

    Under the Master Plan of 1960, California was the first state to provide universal access to higher education for all high school graduates. Despite great success at all levels, higher education in California is now facing a crisis. National and state-wide recessions have reduced resources while potential enrollment is sharply increasing from…

  3. Syracuse urban forest master plan: guiding the city's forest resource into the 21st century

    Treesearch

    David J. Nowak; Paul R. O' Connor; [Compilers

    2001-01-01

    The Syracuse Urban Forest Master Plan is one of the most comprehensive urban forest assessments ever developed for a city. This report combines a high-resolution digital urban cover map with field vegetation sampling data from all land uses, a 100-percent street-tree inventory, a survey of city residents regarding desirable and undesirable tree characteristics and...

  4. Master Plan for Educational Facilities: West New York, Hudson County, New Jersey.

    ERIC Educational Resources Information Center

    Engelhardt and Engelhardt, Inc., Purdy Station, NY.

    West New York is a city in New Jersey with a land area of 1.02 square miles and a population estimated in 1978 to be 42,500 persons. This master plan for educational facilities begins with an overview of the district and utilizes a number of maps to illustrate characteristics of the area, including its topography, relationship to key population…

  5. ACCESS TO QUALITY COMMUNITY COLLEGE OPPORTUNITY, A MASTER PLAN FOR MASSACHUSETTS COMMUNITY COLLEGES THROUGH 1975. SUMMARY REPORT.

    ERIC Educational Resources Information Center

    DEYO, DONALD E.

    THIS SUMMARY REPORT REAPPRAISES THE 1958 MASTER PLAN AND PROJECTS THE COMMUNITY COLLEGE SYSTEM TO 1975 ACCORDINGLY. IT COVERS ALL ASPECTS OF SUCH A SYSTEM AND MAY SERVE AS A GUIDE TO OTHER STATE OR REGIONAL PLANNERS. ITS CONSIDERATIONS INCLUDE (1) A PHILOSOPHY OF HIGHER EDUCATION, (2) THE PURPOSE AND FUNCTION OF THE MASSACHUSETTS COMMUNITY COLLEGE…

  6. Application of restoration scenarios to basin-scale demographics of coho salmon inferred from pit-tags

    EPA Science Inventory

    Effective habitat restoration planning requires correctly anticipating demographic responses to altered habitats. New applications of Passive Integrated Transponder (PIT) tag technology to fish-habitat research have provided critical insights into fish movement, growth, and surv...

  7. Nisqually Community Forest VELMA modeling

    EPA Science Inventory

    We developed a set of modeling tools to support community-based forest management and salmon-recovery planning in Pacific Northwest watersheds. Here we describe how these tools are being applied to the Mashel River Watershed in collaboration with the Board of Directors of the Nis...

  8. Using Climate Change Information in Large Scale Coastal Planning: Louisiana's 2017 Coastal Master Plan

    NASA Astrophysics Data System (ADS)

    Reed, D.

    2017-12-01

    The Louisiana coast has suffered severe land loss in recent decades as human activities have exacerbated the effects of natural stressors leading to catastrophic land loss and increased flood threats to coastal communities. Planning for the future requires a recognition of climate change but also leads to the challenge of understanding how different plausible future conditions influence the outcomes of restoration and protection actions. In coastal Louisiana, the $50 billion Coastal master Plan is legislatively required to be revisited every 5 years in order to ensure that plans for the future continue to be based on the best available, but constantly evolving, scientific information. For the 2017 iteration of the Coastal Master Plan, identification of the environmental scenarios to be explored began in 2014 and included both professional judgment regarding the most important drivers of future change, as well as climate change information derived during the National Climate Assessment. The number of scenarios to be explored was limited by both available resources and the need to make the findings accessible to stakeholders and policy makers. Plausible ranges were identified for key drivers of coastal landscape change, including climatic factors such as eustatic sea-level, precipitation and evapotranspiration. Sensitivity analysis was conducted to explore how the coastal landscape changed in response to combinations of values, allowed agency personnel to select three scenarios against which to test the effectiveness of different restoration and protection actions. The 2017 Coastal Master Plan was then developed by exploring the response of different actions to the scenarios, and how project costs also varied depending on future conditions. Such consideration of climate change in coastal planning at the state scale is facilitated by the availability of scientifically valid information on climate change, that has already been reviewed and sourced.

  9. Current Trends in Communication Graduate Degrees: Survey of Communications, Advertising, PR, and IMC Graduate Programs

    ERIC Educational Resources Information Center

    Quesenberry, Keith A.; Coolsen, Michael K.; Wilkerson, Kristen

    2015-01-01

    A survey of 61 master's degree advertising programs reveals significant trends in program titles, curriculum design, course delivery, and students served. The results provide insight for current and planned master's degree programs as research predicts a continued increase in demand for master's education over the next decade. Survey results are…

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haggard, K.; Cooper, P.; McDonald, M.

    The authors along with Catriona Gay, Dan Panetta, and Doug Williams, served as sustainability consultants to Sasaki Assoc. who are preparing the master plan for the new Cal. State Univ. at Monterey Bay. This project is a product of conversion of the Ft. Ord Military Reservation to a new California State campus and other facilities. This paper describes proposals made to Sasaki and campus committees regarding concepts of sustainability that can be incorporated into the master plan.

  11. Re-Introduction of Lower Columbia River Chum Salmon into Duncan Creek, 2002-2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hillson, Todd D.

    2003-10-15

    The National Marine Fisheries Service (NMFS) listed Lower Columbia River chum as threatened under the auspices of the Endangered Species Act (ESA) in March of 1999 (64 FR 14508, March 25, 1999). The listing was in response to reduction in abundance from historical levels of more than half a million returning adults to fewer than 10,000 present day spawners. Harvest, loss of habitat, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for the decline of Columbia River chum salmon. The timing of seasonal changes in river flow and water temperatures is perhaps the most criticalmore » factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Currently, only two main populations are recognized as genetically distinct in the Columbia River, although spawning has been documented in most lower Columbia River tributaries. The first is located in the Grays River (RKm 34) (Grays population), a tributary of the Columbia, and the second is a group of spawners that utilize the Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks (Lower Gorge population). A possible third population of mainstem spawners, found in the fall of 1999, were located spawning above the I-205 bridge (approximately RKm 182), this aggregation is referred to as the Woods Landing/Rivershore population or the I-205 group. The recovery strategy for Lower Columbia River (LCR) chum as outlined in Hatchery Genetic Management Plans (HGMP) has three main tasks. First, determine if remnant populations of LCR chum salmon exist in LCR tributaries. Second, if such populations exist, develop stock-specific recovery plans involving habitat restoration including the creation of spawning refugias, supplementation if necessary and a habitat and fish monitoring and evaluation plan. If chum have been extirpated from previously utilized streams, develop re-introduction plans that utilize appropriate genetic donor stock(s) of LCR chum salmon and integrate habitat improvement and fry-to-adult survival evaluations. Third, reduce extinction risks to the Grays River chum salmon population by randomly capturing adults in the basin for use in a supplementation program and reintroduction into the Chinook River basin. The Duncan Creek project was developed using the same recovery strategy implemented for LCR chum. Biologists with the WDFW and Pacific States Marine Fisheries Commission (PSMFC) identified Duncan Creek as an ideal upriver location below Bonneville Dam for chum re-introduction. It has several attributes that make it a viable location for a re-introduction project: historically chum salmon were present, the creek is low gradient, has numerous springs/seeps, has a low potential for future development and is located close to a donor population of Lower Gorge chum. The Duncan Creek project has two goals: (1) re-introduction of chum into Duncan Creek by providing off channel high-quality spawning and incubation areas, and (2) to simultaneously evaluate natural recolonization and a supplementation strategy where adults are collected and spawned artificially at a hatchery. For supplementation, eggs are incubated and the fry reared at the Washougal Hatchery to be released back into Duncan Creek. The tasks associated with re-establishing a naturally self-sustaining population include: (1) removing mud, sand and organics present in four of the creek branches and replace with gravels expected to provide maximum egg-to-fry survival rates to a depth of at least two feet; (2) armoring the sides of these channels to reduce importation of sediment by fish spawning on the margins; (3) planting native vegetation adjacent to the channels to stabilize the banks, trap silt and provide shade; (4) annual sampling of gravel in the spawning channels to detect changes in gravel composition and sedimentation levels. Tasks associated with the second goal of the recovery strategy for Lower Columbia River chum are detailed in The Monitoring and Evaluation Plan for the Duncan Creek Chum Salmon Reintroduction Program. Four main questions are used to evaluate the success of this program: (1) what egg-to-fry survival rates are being achieved in the renovated channels, (2) what is the survival of the eggs and fry used in the artificial rearing program in Duncan Creek, (3) what is the survival and spawning ground distribution of adult chum salmon produced from the spawning channels and the artificial rearing program, and (4) what is the straying rate of non-program chum salmon into Duncan Creek. The monitoring portion of the Duncan M&E includes documenting and monitoring the physical attributes of the channels.« less

  12. 78 FR 48672 - Environmental Impacts Statements;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Bend Vegetation Management Project, Review Period Ends: 09/19/2013, Contact: Beth Peer 541-383- 4769... Supplement, USFS, ID, Salmon-Challis National Forest Travel Planning and OHV Designation Project, Comment... Mine Project, Comment Period Ends: 09/23/2013, Contact: Shiva Achet 575-234-5924 EIS No. 20130235...

  13. 76 FR 6400 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... promote local adaptation, and (5) use spring-run Chinook salmon demographic, biological, and genetic data...). The application includes a Hatchery and Genetic Management Plan (HGMP) that provides detailed... and desired genetic and phenotypic characteristics of the fish, and therefore increase the likelihood...

  14. 77 FR 28855 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... continued commitment and leadership will be needed to implement the necessary recovery actions. We therefore support and participate in locally led, collaborative efforts to develop salmon and steelhead recovery... region of Washington. The LCFRB led a collaborative process to develop the Washington Lower Columbia...

  15. 78 FR 41911 - Endangered and Threatened Species; Recovery Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... continued commitment and leadership will be needed to implement the necessary recovery actions. We therefore support and participate in locally led, collaborative efforts to develop salmon and steelhead recovery... Columbia region of Washington. The LCFRB led a collaborative process to develop the Washington Lower...

  16. Discovering Alaska's Salmon: A Children's Activity Book.

    ERIC Educational Resources Information Center

    Devaney, Laurel

    This children's activity book helps students discover Alaska's salmon. Information is provided about salmon and where they live. The salmon life cycle and food chains are also discussed. Different kinds of salmon such as Chum Salmon, Chinook Salmon, Coho Salmon, Sockeye Salmon, and Pink Salmon are introduced, and various activities on salmon are…

  17. Preliminary Optimization for Spring-Run Chinook Salmon Environmental Flows in Lassen Foothill Watersheds

    NASA Astrophysics Data System (ADS)

    Ta, J.; Kelsey, R.; Howard, J.; Hall, M.; Lund, J. R.; Viers, J. H.

    2014-12-01

    Stream flow controls physical and ecological processes in rivers that support freshwater ecosystems and biodiversity vital for services that humans depend on. This master variable has been impaired by human activities like dam operations, water diversions, and flood control infrastructure. Furthermore, increasing water scarcity due to rising water demands and droughts has further stressed these systems, calling for the need to find better ways to identify and allocate environmental flows. In this study, a linear optimization model was developed for environmental flows in river systems that have minimal or no regulation from dam operations, but still exhibit altered flow regimes due to surface water diversions and groundwater abstraction. Flow regime requirements for California Central Valley spring-run Chinook salmon (Oncorhynchus tshawytscha) life history were used as a test case to examine how alterations to the timing and magnitude of water diversions meet environmental flow objectives while minimizing impact to local water supply. The model was then applied to Mill Creek, a tributary of the Sacramento River, in northern California, and its altered flow regime that currently impacts adult spring-run Chinook spawning and migration. The resulting optimized water diversion schedule can be used to inform water management decisions that aim to maximize benefit for the environment while meeting local water demands.

  18. Salmonid Gamete Preservation in the Snake River Basin, 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armstrong, Robyn; Kucera, Paul

    2002-06-01

    Steelhead (Oncorhynchus mykiss) and chinook salmon (Oncorhynchus tshawytscha) populations in the Northwest are decreasing. Genetic diversity is being lost at an alarming rate. Along with reduced population and genetic variability, the loss of biodiversity means a diminished environmental adaptability. The Nez Perce Tribe (Tribe) strives to ensure availability of genetic samples of the existing male salmonid population by establishing and maintaining a germplasm repository. The sampling strategy, initiated in 1992, has been to collect and preserve male salmon and steelhead genetic diversity across the geographic landscape by sampling within the major river subbasins in the Snake River basin, assuming amore » metapopulation structure existed historically. Gamete cryopreservation conserves genetic diversity in a germplasm repository, but is not a recovery action for listed fish species. The Tribe was funded in 2001 by the Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service Lower Snake River Compensation Plan (LSRCP) to coordinate gene banking of male gametes from Endangered Species Act (ESA) listed steelhead and spring and summer chinook salmon in the Snake River basin. In 2001, a total of 398 viable chinook salmon semen samples from the Lostine River, Catherine Creek, upper Grande Ronde River, Lookingglass Hatchery (Imnaha River stock), Lake Creek, the South Fork Salmon River weir, Johnson Creek, Big Creek, Capehorn Creek, Marsh Creek, Pahsimeroi Hatchery, and Sawtooth Hatchery (upper Salmon River stock) were cryopreserved. Also, 295 samples of male steelhead gametes from Dworshak Hatchery, Fish Creek, Grande Ronde River, Little Sheep Creek, Pahsimeroi Hatchery and Oxbow Hatchery were also cryopreserved. The Grande Ronde chinook salmon captive broodstock program stores 680 cryopreserved samples at the University of Idaho as a long-term archive, half of the total samples. A total of 3,206 cryopreserved samples from Snake River basin steelhead and spring and summer chinook salmon, from 1992 through 2001, are stored in two independent locations at the University of Idaho (UI) and Washington State University (WSU). Two large freezer tanks are located at each university. Recommendations for future gene banking efforts include the need for establishment of a regional genome resource bank, an emphasis on cryopreserving wild unmarked fish, continued fertility trials, and genetic analysis on all fish represented in the germplasm repository.« less

  19. 14 CFR 151.27 - Procedures: Application, plans, specifications, and appraisals.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... layout plan approved by the Administrator; and (2) Preliminary plans and specifications in enough detail... accomplishing the project in accordance with the master plan layout, the rules in subparts B and C and...

  20. 14 CFR 151.27 - Procedures: Application, plans, specifications, and appraisals.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... layout plan approved by the Administrator; and (2) Preliminary plans and specifications in enough detail... accomplishing the project in accordance with the master plan layout, the rules in subparts B and C and...

  1. Survival of juvenile chinook salmon and coho salmon in the Roza Dam fish bypass and in downstream reaches of the Yakima River, Washington, 2016

    USGS Publications Warehouse

    Kock, Tobias J.; Perry, Russell W.; Hansen, Amy C.

    2016-12-22

    Estimates of juvenile salmon survival are important data for fishery managers in the Yakima River Basin. Radiotelemetry studies during 2012–14 showed that tagged juvenile Chinook salmon (Oncorhynchus tshawytscha) that passed through the fish bypass at Roza Dam had lower survival than fish that passed through other routes at the dam. That study also identified flow-survival relationships in the reaches between the Roza Dam tailrace and Sunnyside Dam. During 2012–14, survival also was estimated through reaches downstream of Sunnyside Dam, but generally, sample sizes were low and the estimates were imprecise. In 2016, we conducted an evaluation using acoustic cameras and acoustic telemetry to build on information collected during the previous study. The goal of the 2016 research was to identify areas where mortality occurs in the fish bypass at Roza Dam, and to estimate reach-specific survival in reaches downstream of the dam. The 2016 study included juvenile Chinook salmon and coho salmon (O. kisutch).Three acoustic cameras were used to observe fish behavior (1) near the entrances to the fish bypass, (2) at a midway point in the fish bypass (convergence vault), and (3) at the bypass outfall. In total, 504 hours of acoustic camera footage was collected at these locations. We determined that smolt-sized fish (95–170 millimeters [mm]) were present in the highest proportions at each location, but predator-sized fish (greater than 250 mm) also were present at each site. Fish presence generally peaked during nighttime hours and crepuscular periods, and was low during daytime hours. In the convergence vault, smolt-sized fish exhibited holding behavior patterns, which may explain why some fish delayed while passing through the bypass.Some of the acoustic-tagged fish were delayed in the fish bypass following release, but there was no evidence to suggest that they experienced higher mortality than fish that were released at the bypass outfall or downstream of the dam. Most of the tagged fish that were released in the fish bypass moved downstream and re-entered the river within 12 hours, but 9.8 percent of the Chinook salmon and 15.7 percent of the coho salmon remained in the bypass for 2.5–17.4 days. We developed a set of models for Chinook salmon and coho salmon and used model selection to determine if release site was an important predictor of survival of tagged fish. The models that provided the best fit to the Chinook salmon and coho salmon datasets did not include release site as a covariate. Furthermore, survival estimates for groups of fish from the various release sites were nearly identical for both species. Based on these observations, it appears that passage through the fish bypass did not result in increased mortality relative to groups of fish released downstream of the bypass.Juvenile Chinook salmon migrated downstream faster than juvenile coho salmon and survival for each species varied with release timing. Median travel time from release at Roza Dam to arrival at a detection gate located at river kilometer (rkm) 527.8 on the Columbia River was 15.4 days for Chinook salmon and 37.4 days for coho salmon. Cumulative survival from Roza Dam to the Columbia River detection gate ranged from 0.299 to 0.678 for Chinook salmon, and from 0.321 to 0.627 for coho salmon. Survival was highest for both species when tagged fish were released in mid-April and lowest when tagged fish were released in early-May. Reach-specific survival estimates were standardized to create estimates that described survival per 100 rkm, which showed that survival was very low (less than 0.500) for some release groups, particularly in the Roza, Sunnyside, and Chandler diversion reaches. A more extensive analysis of reach-specific survival is planned for this dataset, which should provide insights into covariates that affected survival during 2016.

  2. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  3. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  4. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  5. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  6. 42 CFR 441.156 - Team developing individual plan of care.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... mental diseases, and a psychologist who has a master's degree in clinical psychology or who has been... individuals. (4) A psychologist who has a master's degree in clinical psychology or who has been certified by...

  7. Implementing the enterprise master patient index.

    PubMed

    Adragna, L

    1998-10-01

    In implementing a cross-facility initiative, the importance of planning and understanding the implications for all facilities can't be overlooked. Here's how one integrated delivery network navigated the challenges of implementing a cross-facility enterprise master patient index.

  8. DPSC (Defense Personnel Support Center) Total Quality Management Master Plan

    DTIC Science & Technology

    1989-07-01

    SUBTITLE 5. FUNDING NUMBERS DPSC Total Quality Management Master Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) B. PERFORMING...quality supported solider, sailor, airman and marine. % j cl 1 14. SUBJECT TERMS I 1S. NUMBER OF PAGES TQM (Total Quality Management ), Continuous...THE COMMANDER ON TOTAL QUALITY MANAGEMENT i SECTION I INTRODUCTION 1 II CONCEPTS 6 TQM Basics 7 Continuous Process Improvement 7 DoD TQM Philosophy 9

  9. Master Plan of Operation for Preparing a Programme of Inter-Related Services for Children in Afghanistan, 1977-1978. Part I: The Framework; Part II: The Programme.

    ERIC Educational Resources Information Center

    United Nations Children's Fund, Kabul (Afghanistan).

    This Master Plan of Operation has two parts: The Framework and the Program. Part I (the Framework) sets out the articles of agreement between the Government of Afghanistan and the United Nations Children's Fund (UNICEF) concerning a 1-year program for the improvement of social services for children and mothers regarded as the most disadvantaged…

  10. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    ERIC Educational Resources Information Center

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  11. Snake River Sockeye Salmon Habitat and Limnological Research; 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohler, Andre E.; Taki, Doug; Griswold, Robert G.

    2004-08-01

    In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list the Snake River sockeye salmon (Oncorhynchus nerka) as endangered. As a result of that petition the Snake River sockeye salmon was officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Program was implemented (Project Number 91-71, Intergovernmental Contract Number DE-BI79-91bp22548). This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of O. nerka. The Shoshone-Bannock Tribal goal for this project ismore » two tiered: The immediate goal is to increase the population of Snake River sockeye salmon while preserving the unique genetic characteristics of the Evolutionarily Significant Unit (ESU). The Tribes long term goal is to maintain a viable population that warrants delisting and provides Tribal harvest opportunities. The Bonneville Power Administration (BPA) provides funding for this interagency recovery program through the Northwest Power Planning Council Fish and Wildlife Program (NPPCFWP). Collaborators in the recovery effort include the National Marine Fisheries Service (NMFS), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), U.S. Forest Service (USFS), and the Shoshone-Bannock Tribe (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2002 calendar year. Project objectives include: (1) monitor over-winter survival and emigration of juvenile anadromous O. nerka stocked from the captive rearing program; (2) fertilize Redfish Lake (3) conduct kokanee salmon (non-anadromous O. nerka) population surveys; (4) monitor spawning kokanee escapement and estimate fry recruitment on Fishhook, Alturas Lake, and Stanley Lake creeks; (5) evaluate potential competition and predation between stocked juvenile O. nerka and a variety of fish species in Redfish, Pettit, and Alturas lakes; and (6) monitor limnological parameters of Sawtooth Valley lakes to assess lake productivity.« less

  12. The hydrology of four streams in western Washington as related to several Pacific salmon species

    USGS Publications Warehouse

    Collings, Michael R.; Smith, Ronald W.; Higgins, G.T.

    1972-01-01

    Enhancement-or possibly even preservation-of the Pacific salmon hinges on the careful planning and proper management of the streamflow upon which they depend for spawning. Most spawning activity occurs on reaches of streams where specific hydraulic conditions exist and where stream-channel characteristics and water-quality criteria are met. The present report is the first of a series and is used to present the method of determining preferred spawning conditions and results of the investigation of 129 measurements on 14 study reaches of the Dewatto, Cedar, Kalama, and North 'Fork Nooksack Rivers. Subsequent reports, using the same method will present analyses and preferred spawning and rearing discharges for other streams used by salmon. The method consists of measuring water depth and velocities to designate, from area-(spawnable) discharge curves, peak, preferred spawning discharges for fall chinook, spring chinook, sockeye, and coho salmon at each reach on each river. Also, streambed gravels, water temperature, suspended sediment, dissolved oxygen, and specific conductance are used to help evaluate river conditions during spawning. In examining the repeatability of the method, tested by analyzing independently each of selected pairs of adjacent reaches on the Cedar River, it was found that the preferred peak discharges from the comparisons varied 4.6 percent for the average of four species and two pairs of reaches. Peak spawning discharges ranged, for the four salmon species on each of the three study reaches of each river, from 50 to 140 cfs (cubic feet per second) on Dewatto River, from 230 to 510 cfs on Cedar River, from 245 to 800 cfs on Kalama River, and from 195 to 710 cfs on North Fork Nooksack River. The results indicate that the methods used and the probable discharge values determined are reasonable and, if economically justified, may be used to select discharges, for salmon spawning and rearing.

  13. Incorporating natural hazard assessments into municipal master-plans; case-studies from Israel

    NASA Astrophysics Data System (ADS)

    Katz, Oded

    2010-05-01

    The active Dead Sea Rift (DSR) runs along the length of Israel, making the entire state susceptible to earthquake-related hazards. Current building codes generally acknowledge seismic hazards and direct engineers towards earthquake-resistant structures. However, hazard mapping on a scale fit for municipal/governmental planning is subject to local initiative and is currently not mandatory as seems necessary. In the following, a few cases of seismic-hazard evaluation made by the Geological Survey of Israel are presented, emphasizing the reasons for their initiation and the way results were incorporated (or not). The first case is a seismic hazard qualitative micro-zonation invited by the municipality of Jerusalem as part of a new master plan. This work resulted in maps (1:50,000; GIS format) identifying areas prone to (1) amplification of seismic shaking due to site characteristics (outcrops of soft rocks or steep topography) and (2) sites with earthquake induced landslide (EILS) hazard. Results were validated using reports from the 1927, M=6.2 earthquake that originated along the DSR about 30km east of Jerusalem. Although the hazard maps were accepted by municipal authorities, practical use by geotechnical engineers working within the frame of the new master-plan was not significant. The main reason for that is apparently a difference of opinion between the city-engineers responsible for implementing the new master-plan and the geologists responsible of the hazard evaluation. The second case involves evaluation of EILS hazard for two towns located further north along the DSR, Zefat and Tiberias. Both were heavily damaged more than once by strong earthquakes in past centuries. Work was carried out as part of a governmental seismic-hazard reduction program. The results include maps (1:10,000 scales) of sites with high EILS hazard identified within city limits. Maps (in GIS format) were sent to city engineers with reports explaining the methods and results. As far as we know, widespread implementation of the maps within municipal master plans never came about, and there was no open discussion between city engineers and the Geological Survey. The main reasons apparently are (1) a lack, until recently, of mandatory building codes requiring incorporation of EILS hazard; (2) budget priorities; (3) failure to involve municipality personnel in planning and executing the EILS hazard evaluation. These cases demonstrate that for seismic hazard data to be incorporated and implemented within municipal master-plans there needs to be (1) active involvement of municipal officials and engineers from the early planning stages of the evaluation campaign, and (2) a-priori dedication of funds towards implementation of evaluation results.

  14. Physiological consequences of the salmon louse (Lepeophtheirus salmonis) on juvenile pink salmon (Oncorhynchus gorbuscha): implications for wild salmon ecology and management, and for salmon aquaculture.

    PubMed

    Brauner, C J; Sackville, M; Gallagher, Z; Tang, S; Nendick, L; Farrell, A P

    2012-06-19

    Pink salmon, Oncorhynchus gorbuscha, are the most abundant wild salmon species and are thought of as an indicator of ecosystem health. The salmon louse, Lepeophtheirus salmonis, is endemic to pink salmon habitat but these ectoparasites have been implicated in reducing local pink salmon populations in the Broughton Archipelago, British Columbia. This allegation arose largely because juvenile pink salmon migrate past commercial open net salmon farms, which are known to incubate the salmon louse. Juvenile pink salmon are thought to be especially sensitive to this ectoparasite because they enter the sea at such a small size (approx. 0.2 g). Here, we describe how 'no effect' thresholds for salmon louse sublethal impacts on juvenile pink salmon were determined using physiological principles. These data were accepted by environmental managers and are being used to minimize the impact of salmon aquaculture on wild pink salmon populations.

  15. Momentum: "Developing Masterful Marketing Plans."

    ERIC Educational Resources Information Center

    Meservey, Lynne D.

    1988-01-01

    Describes how directors can plan and develop a written marketing plan which can increase enrollment at child care centers. Components of successful marketing plans include parent retention; program merchandising; staff and director training; sales promotions; networking; and enrichment programs/fundraising. (NH)

  16. LIFE HISTORY MONITORING OF SALMONIDS IN THE WEST FORK SMITH RIVER, UMPQUA BASIN, OREGON

    EPA Science Inventory

    As a life-cycle monitoring basin for the Oregon Salmon Plan, the Oregon Department of Fish and Wildlife has estimated adult returns, distribution and smolt outmigration of coho, chinook and winter steelhead in the West Fork Smith River since 1998. In 2001/2002, the Environmenta...

  17. Immunostimulation of Salmo salar L., and its effect on Lepeophtheirus salmonis (Krøyer) P-glycoprotein mRNA expression following subsequent emamectin benzoate exposure.

    PubMed

    Igboeli, O O; Purcell, S L; Wotton, H; Poley, J; Burka, J F; Fast, M D

    2013-03-01

    Control of sea lice, Lepeophtheirus salmonis, on farmed Atlantic salmon, Salmo salar, relies heavily on chemotherapeutants. However, reduced efficacy of many treatments and need for integrated sea lice management plans require innovative strategies. Resistance to emamectin benzoate (EMB), a major sea lice parasiticide, has been linked with P-glycoprotein (P-gp) expression. We hypothesized that host immunostimulation would complement EMB treatment outcome. Lepeophtheirus salmonis-infected Atlantic salmon were fed immunostimulatory or control feeds. Sea lice were collected for 24-h EMB bioassays 1 and 2 weeks prior to commencement of EMB treatment of the fish. Two weeks after cessation of immunostimulant-treated feed, EMB was administered at 150 μg kg(-1) fish biomass for 7 days. The bioassay revealed stage, gender and immunostimulant-related differences in EMB EC(50) . Sea lice attached to salmon with a history of immunostimulation exhibited significantly greater survival than those on control feeds, despite similar levels of EMB in host tissues. Lepeophtheirus salmonis from salmon with a history of immunostimulation also exhibited higher P-gp mRNA expression as well as greater survivability compared to controls. Administration of immunostimulants prior to EMB treatment caused increased expression of P-gp mRNA which could have consequently caused decreased efficacy of the parasiticide. © 2013 Blackwell Publishing Ltd.

  18. Guidelines for monitoring and adaptively managing restoration of Chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss) on the Elwha River

    USGS Publications Warehouse

    Peters, R.J.; Duda, J.J.; Pess, G.R.; Zimmerman, M.; Crain, P.; Hughes, Z.; Wilson, A.; Liermann, M.C.; Morley, S.A.; McMillan, J.; Denton, K.; Warheit, K.

    2014-01-01

    The restoration of the migration route to spawning and rearing habitats upstream of the former Glines Canyon Dam represents a great opportunity for salmon on the Olympic Peninsula. By removing two aging structures, it will be possible for all 5 species of salmon and steelhead to return to wild stretches of the Elwha River and major floodplain habitat characterized by multiple channels, as well as significant portions of numerous tributaries. Measuring the progress of restoration, from the perspective of both salmon populations and the ecosystem upon which they depend, is a great test for a collaborative team of scientists. The normally challenging conditions of working in a steep gradient, high velocity wilderness river are exacerbated by the release of millions of cubic yards of sediment that had accumulated in the reservoirs. After the first two years of the dam decommissioning process, this release has changed the ecology of the river, estuary, and nearshore habitats downstream of the dams. Our goal in developing the guidelines described is to provide a roadmap for tracking what hopefully will become a successful outcome. If successfully implemented, this information should prove useful as others begin planning for the removal, alteration, or reconstruction of dams throughout North America and elsewhere, an inevitable outcome of an aging dam infrastructure.

  19. Camera Ready Masters. B/M-1 Resource Assessment. B/M-2 Surveying. B/M-3 Tabulation. B/M-4 Selecting Program Goals. B/M-5 Producing CDU's. Career Planning Support System.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Center for Vocational Education.

    This package of camera ready masters is one of a set of twelve documents describing the Career Planning Support System (CPSS) and its use. (CPSS is a comprehensive guidance program management system which (1) provides techniques to improve a high school's career guidance program, (2) focuses on the skills students need to make decisions about and…

  20. Gavins Point Dam/Lewis and Clark Lake Master Plan. Missouri River, Nebraska and South Dakota: Update of Design Memorandum MG-123

    DTIC Science & Technology

    2004-12-01

    plover. These birds nest on barren sandbars close to the water surface downstream from the Gavins Point Dam on the Missouri National Recreational...nest on the barren sand and gravel beaches of the Great Gavins Point Dam/Lewis and Clark Lake Master Plan Update...Nebraska. The four Iowa counties (Pottawattamie, Plymouth , Sioux, Woodbury) within the primary market area had a population of 248,019, which contributed

  1. Environmental Assessment for the Bear Creek Dam and Lake Project Master Plan, South Platte River, Colorado

    DTIC Science & Technology

    2012-09-01

    erosion. Piney Creek alluvium along the low terraces is Holocene in age and rock fragments in this area have igneous or metamorphic lithology with...to the Red Rocks Amphitheatre and Bandimere Speedway, which are a brief drive from the Park. Recreational use of Bear Creek Lake is also... US Army Corps of Engineers ® Omaha District Environmental Assessment for the Bear Creek Dam and Lake Project Master Plan South Platte River

  2. 14 CFR 152.113 - Application requirements: Airport planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Application requirements: Airport planning....113 Application requirements: Airport planning. (a) Application for Federal assistance. An eligible sponsor or planning agency that desires to obtain Federal aid for eligible airport master planning or...

  3. Atlantic salmon brood stock management and breeding handbook

    USGS Publications Warehouse

    Kincaid, Harold L.; Stanley, Jon G.

    1989-01-01

    Anadromus runs of Atlantic salmon have been restored to the Connecticut, Merrimack, Pawcatuck, Penobscot, and St. Croix rivers in New England by the stocking of more than 8 million smolts since 1948. Fish-breeding methods have been developed that minimize inbreeding and domestication and enhance natural selection. Methods are available to advance the maturation of brood stock, control the sex of production lots and store gametes. Current hatchery practices emphasize the use of sea-run brood stock trapped upon return to the rivers and a limited number of captive brood stock and rejuvenated kelts. Fish are allowed to mature naturally, after which they are spawned and incubated artificially. Generally, 1-year smolts are produced, and excess fish are stocked as fry in headwater streams. Smolts are stocked during periods of rising water in spring. Self-release pools are planned that enable smolts to choose the emigration time. Culturists keep good records that permit evaluation of the performance of strains and the effects of breeding practices. As Atlantic salmon populations expand, culturists must use sound breeding methods that enhance biotic potential while maintaining genetic diversity and protecting unique gene pools.

  4. Elwha River dam removal-Rebirth of a river

    USGS Publications Warehouse

    Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    After years of planning for the largest project of its kind, the Department of the Interior will begin removal of two dams on the Elwha River, Washington, in September 2011. For nearly 100 years, the Elwha and Glines Canyon Dams have disrupted natural processes, trapping sediment in the reservoirs and blocking fish migrations, which changed the ecology of the river downstream of the dams. All five Pacific salmon species and steelhead-historically present in large numbers-are locally extirpated or persist in critically low numbers. Upstream of the dams, more than 145 kilometers of pristine habitat, protected inside Olympic National Park, awaits the return of salmon populations. As the dams are removed during a 2-3 year project, some of the 19 million cubic meters of entrapped sediment will be carried downstream by the river in the largest controlled release of sediment into a river and marine waters in history. Understanding the changes to the river and coastal habitats, the fate of sediments, and the salmon recolonization of the Elwha River wilderness will provide useful information for society as future dam removals are considered.

  5. Developing a Robust Strategy for Implementing a Water Resources Master Plan in Lima, Peru

    NASA Astrophysics Data System (ADS)

    Kalra, N.; Groves, D.; Bonzanigo, L.; Molina-Perez, E.

    2015-12-01

    Lima, the capital of Peru, faces significant water stress. It is the fifth largest metropolitan area in Latin America, and the second largest desert city in the world. The city has developed a Master Plan of major investment projects to improve water reliability until 2040. Yet key questions remain. Is the Master Plan sufficient for ensuring reliability in the face of deeply uncertain future climate change and demand? How do uncertain budget and project feasibility conditions shape Lima's options? How should the investments in the plan be prioritized, and can some be delayed? Lima is not alone in facing these planning challenges. Governments invest billions of dollars annually in long-term projects. Yet deep uncertainties pose formidable challenges to making near-term decisions that make long-term sense. The World Bank has spearheaded a community of practice on methods for Decision Making Under Deep Uncertainty (DMU). This pilot project in Peru is the first in-depth application of DMU techniques to water supply planning in a developing country. It builds on prior analysis done in New York, California, and for the Colorado River, yet shows how these methods can be applied in regions which do not have as advanced data or tools available. The project combines three methods in particular -- Robust Decision Making, Decision Scaling, and Adaptive Pathways -- to help Lima implement its Master Plan in a way that is robust, no-regret, and adaptive. It was done in close partnership with SEDAPAL, the water utility company in Lima, and in coordination with other national WRM and meteorological agencies. This talk will: Present the planning challenges Lima and other cities face, including climate change Describe DMU methodologies and how they were applied in collaboration with SEDAPAL Summarize recommendations for achieving long-term water reliability in Lima Suggest how these methodologies can benefit other investment projects in developing countries.

  6. The effect of exposure to farmed salmon on piscine orthoreovirus infection and fitness in wild Pacific salmon in British Columbia, Canada

    PubMed Central

    2017-01-01

    The disease Heart and Skeletal Muscle Inflammation (HSMI) is causing substantial economic losses to the Norwegian salmon farming industry where the causative agent, piscine orthoreovirus (PRV), is reportedly spreading from farmed to wild Atlantic salmon (Salmo salar) with as yet undetermined impacts. To assess if PRV infection is epidemiologically linked between wild and farmed salmon in the eastern Pacific, wild Pacific salmon (Oncorhynchus sp.) from regions designated as high or low exposure to salmon farms and farmed Atlantic salmon reared in British Columbia (BC) were tested for PRV. The proportion of PRV infection in wild fish was related to exposure to salmon farms (p = 0.0097). PRV was detected in: 95% of farmed Atlantic salmon, 37–45% of wild salmon from regions highly exposed to salmon farms and 5% of wild salmon from the regions furthest from salmon farms. The proportion of PRV infection was also significantly lower (p = 0.0008) where wild salmon had been challenged by an arduous return migration into high-elevation spawning habitat. Inter-annual PRV infection declined in both wild and farmed salmon from 2012–2013 (p ≤ 0.002). These results suggest that PRV transfer is occurring from farmed Atlantic salmon to wild Pacific salmon, that infection in farmed salmon may be influencing infection rates in wild salmon, and that this may pose a risk of reduced fitness in wild salmon impacting their survival and reproduction. PMID:29236731

  7. The effect of exposure to farmed salmon on piscine orthoreovirus infection and fitness in wild Pacific salmon in British Columbia, Canada.

    PubMed

    Morton, Alexandra; Routledge, Richard; Hrushowy, Stacey; Kibenge, Molly; Kibenge, Frederick

    2017-01-01

    The disease Heart and Skeletal Muscle Inflammation (HSMI) is causing substantial economic losses to the Norwegian salmon farming industry where the causative agent, piscine orthoreovirus (PRV), is reportedly spreading from farmed to wild Atlantic salmon (Salmo salar) with as yet undetermined impacts. To assess if PRV infection is epidemiologically linked between wild and farmed salmon in the eastern Pacific, wild Pacific salmon (Oncorhynchus sp.) from regions designated as high or low exposure to salmon farms and farmed Atlantic salmon reared in British Columbia (BC) were tested for PRV. The proportion of PRV infection in wild fish was related to exposure to salmon farms (p = 0.0097). PRV was detected in: 95% of farmed Atlantic salmon, 37-45% of wild salmon from regions highly exposed to salmon farms and 5% of wild salmon from the regions furthest from salmon farms. The proportion of PRV infection was also significantly lower (p = 0.0008) where wild salmon had been challenged by an arduous return migration into high-elevation spawning habitat. Inter-annual PRV infection declined in both wild and farmed salmon from 2012-2013 (p ≤ 0.002). These results suggest that PRV transfer is occurring from farmed Atlantic salmon to wild Pacific salmon, that infection in farmed salmon may be influencing infection rates in wild salmon, and that this may pose a risk of reduced fitness in wild salmon impacting their survival and reproduction.

  8. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  9. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  10. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  11. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  12. 14 CFR 152.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... use of land near a public airport, that— (1) Obstructs the airspace required for the flight of... and proposed airport facilities. Airport master planning means the development for planning purposes... specific airport. Airport system planning means the development for planning purposes of information and...

  13. Austin Community College Comprehensive Master Plan, 2000-2001.

    ERIC Educational Resources Information Center

    Austin Community Coll., TX.

    This document describes Austin Community College's (Texas) educational academic plans, facilities plans, and financial implementation plans for 2000-2001. Plan goals and priorities include: (1) enhancing scheduling efficiency while responding to unmet student demand and community needs, and increasing enrollments by 3-5%; (2) opening two…

  14. Developing an interdisciplinary certificate program in transportation planning.

    DOT National Transportation Integrated Search

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  15. D.C. Public School 1997 Repair Program and Facilities Master Plan. Hearing before the Subcommittee on the District of Columbia of the Committee on Government Reform and Oversight. House of Representatives. One Hundred Fifth Congress, Second Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. House Committee on Government Reform and Oversight.

    A Congressional hearing dealt with issues related to the repair program and facilities master plan of the District of Columbia Public Schools (DCPS). Opening remarks by Representative Thomas M. Davis outlined his concern over the delayed opening of the DCPS in the fall of 1997 because of uncompleted roof repairs, and the results from a performance…

  16. Ball Mountain Lake, Jamaica, Vermont. Master Plan for Recreation Resources Development.

    DTIC Science & Technology

    1977-12-01

    Springfield, Vermont 15,695 Brattleboro, Vermont 21,294 Bennington , Vermont 22,536 The balance of the population in the Ball Mountain area is contained...A CORPS OF ENGINEERS WALTHAM A NEW ENGLAND DIV F/6 13/2 DECL MUNTAIN LAKE, JAMAICA. VERMONT . MASTER PL.AN FOR RECREATIO--ETCIU) DE 7ENLSIFE ESG EN-Eh...JAMAICA, VERMONT MASTERPA FOR RECREATION RESOURCES DEVELOPMENT JO - 0 DESIGN MEMORANDUM DW~RIBtMfON STATIEMNT -A DE E B R 1977 Approved for public releris

  17. 50 CFR 226.205 - Critical habitat for Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook salmon. 226.205 Section... Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook... River salmon (except reaches above impassable natural falls, and Dworshak and Hells Canyon Dams...

  18. 50 CFR 226.205 - Critical habitat for Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook salmon. 226.205 Section... Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook... River salmon (except reaches above impassable natural falls, and Dworshak and Hells Canyon Dams...

  19. 50 CFR 226.205 - Critical habitat for Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook salmon. 226.205 Section... Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook... River salmon (except reaches above impassable natural falls, and Dworshak and Hells Canyon Dams...

  20. 50 CFR 226.205 - Critical habitat for Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook salmon. 226.205 Section... Snake River sockeye salmon, Snake River fall chinook salmon, and Snake River spring/summer chinook salmon. The following areas consisting of the water, waterway bottom, and adjacent riparian zone of...

  1. Habitat Utilization by Juvenile Pink and Chum Salmon in Upper Resurrection Bay, Alaska

    DTIC Science & Technology

    1989-11-01

    salmon Oncorhynchus kotez Chum salmon Untcorhynchua kisutch Coho salmon Orncorhynchus nerka Sockeye salmon Oncorhynchus tohawytacha Kink salmon...coho salmon, 40 Dolly Varden, 31 sculpin, 8 tomcod (Microgadus proxins), 17 starry flounder, and 10 sockeye salmon (0. nerka ) stomachs from Cliff and...AK. Godin, J. G. J. 1981. "Daily Patterns of Feeding Behavior, Daily Rations, and Diets of Juvenile Pink Salmon ( Oncorhynchus go’buscha) in Two

  2. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  3. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  4. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  5. 14 CFR 152.325 - Financial status report: Airport planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Financial status report: Airport planning... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.325 Financial status report: Airport planning. Each sponsor of a project for airport master planning and each planning...

  6. Provocative Opinion: Let's Master Our Graduate Programs, Not Doctor Them Up

    ERIC Educational Resources Information Center

    Pilar, Frank

    1974-01-01

    Criticizes recent Ph.D. programs carried out in many universities after World War II. Suggests university departments re-institute high quality two-year master's programs designed to train those who plan to make careers in chemistry at an applied level. (CC)

  7. Louisiana Airport System Plan : financial assessment.

    DOT National Transportation Integrated Search

    1992-07-01

    This report is intended to identify costs and estimates for the improvements identified for Louisiana airports participating in the five-year planning horizon. A database was developed from airport master plans and standard unit costs from recent Lou...

  8. Graduate certificate in transportation planning : final report

    DOT National Transportation Integrated Search

    2008-12-12

    The purpose of this project was to develop and implement a graduate Certificate in Transportation Planning at Texas : A&M University. Texas A&M currently offers instruction in transportation through its Masters of Urban Planning and : Civil Engineeri...

  9. Carishma Gokhale-Welch | NREL

    Science.gov Websites

    planning and strategy. Carishma also supports renewable energy and microgrid projects, energy resilience planning, and assists communities with energy transitions. Education Master of Environmental Management

  10. Alison Holm | NREL

    Science.gov Websites

    renewable energy and energy efficiency into local planning, zoning, and permitting practices; residential and commercial sector solar financing; and resilience planning. Education Master's, Urban and Regional

  11. Workshop to transfer VELMA watershed model results to Washington state tribes and state agencies engaged in watershed restoration and salmon recovery planning

    EPA Science Inventory

    An EPA Western Ecology Division (WED) watershed modeling team has been working with the Snoqualmie Tribe Environmental and Natural Resources Department to develop VELMA watershed model simulations of the effects of historical and future restoration and land use practices on strea...

  12. Declining wild salmon populations in relation to parasites from farm salmon.

    PubMed

    Krkosek, Martin; Ford, Jennifer S; Morton, Alexandra; Lele, Subhash; Myers, Ransom A; Lewis, Mark A

    2007-12-14

    Rather than benefiting wild fish, industrial aquaculture may contribute to declines in ocean fisheries and ecosystems. Farm salmon are commonly infected with salmon lice (Lepeophtheirus salmonis), which are native ectoparasitic copepods. We show that recurrent louse infestations of wild juvenile pink salmon (Oncorhynchus gorbuscha), all associated with salmon farms, have depressed wild pink salmon populations and placed them on a trajectory toward rapid local extinction. The louse-induced mortality of pink salmon is commonly over 80% and exceeds previous fishing mortality. If outbreaks continue, then local extinction is certain, and a 99% collapse in pink salmon population abundance is expected in four salmon generations. These results suggest that salmon farms can cause parasite outbreaks that erode the capacity of a coastal ecosystem to support wild salmon populations.

  13. Emigration of Natural and Hatchery Naco x (Chinook salmon; Oncorhynchus tshawytscha) and Heeyey (Steelhead; Oncorhynchus mykiss) Smolts from the Imnaha River, Oregon from 5 October 2006 to 21 June 2007, Annual Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michaels, Brian; Espinosa, Neal

    2009-02-18

    This report summarizes the Nez Perce Tribe (NPT) Department of Fisheries Resources Management (DFRM) results for the Lower Snake River Compensation Plan (LSRCP) Hatchery Evaluation studies and the Imnaha River Smolt Monitoring Program (SMP) for the 2007 smolt migration from the Imnaha River, Oregon. These studies are closely coordinated and provide information about juvenile natural and hatchery spring/summer Naco x (Chinook Salmon; Oncorhynchus tshawytscha) and Heeyey (steelhead; O. mykiss) biological characteristics, emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam (MCD) on the Columbia River. These studies provide information on listed Naco xmore » (Chinook salmon) and Heeyey (steelhead) for the Federal Columbia River Power System (FCRPS) Biological Opinion (NMFS 2000). The Lower Snake River Compensation Plan program's goal is to maintain a hatchery production program of 490,000 Naco x (Chinook salmon) and 330,000 Heeyey (steelhead) for annual release in the Imnaha River (Carmichael et al. 1998, Whitesel et al. 1998). These hatchery releases occur to compensate for fish losses due to the construction and operation of the four lower Snake River hydroelectric facilities. One of the aspects of the LSRCP hatchery evaluation studies in the Imnaha River is to determine natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolt performance, emigration characteristics and survival (Kucera and Blenden 1998). A long term monitoring effort was established to document smolt emigrant timing and post release survival within the Imnaha River, estimate smolt survival downstream to McNary Dam, compare natural and hatchery smolt performance, and collect smolt-to-adult return information. This project collects information for, and is part of, a larger effort entitled Smolt Monitoring by Federal and Non-Federal Agencies (BPA Project No. 198712700). This larger project provides data on movement of smolts out of major drainages and past dams on the Snake River and Columbia River. In season indices of migration strength and migration timing are provided for the run-at large at key monitoring sites. Marked smolts are utilized to measure travel time and estimate survival through key index reaches. Fish quality and descaling measures are recorded at each monitoring site and provide indicators of the health of the run. Co-managers in the Imnaha River subbasin (Ecovista 2004) have identified the need to collect information on life history, migration patterns, juvenile emigrant abundance, reach specific smolt survivals, and Smolt-to-Adult Return rates (SAR's) for both Heeyey (steelhead) and Naco x (Chinook salmon) smolts. The current study provides information related to the majority of the high priority data needs. Current funding does not allow for determination of a total (annual) juvenile emigrant abundance and lack of adult passive integrated transponder (PIT) tag detectors at the mouth of the Imnaha River results in the inability to calculate tributary specific SAR's. Information is shared with the Fish Passage Center (FPC) on a real time basis during the spring emigration period. The Bonneville Power Administration (BPA) and the United States Fish and Wildlife Service (USFWS) contracted the NPT to monitor emigration timing and tag up to 19,000 emigrating natural and hatchery Naco x (Chinook salmon) and Heeyey (steelhead) smolts from the Imnaha River with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 2007 marked the 16th year of emigration studies on the Imnaha River, and the 14th year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Evaluate effects of flow, temperature and other environmental factors on juvenile migration timing. (2) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery Naco x (Chinook salmon) smolts released at the Imnaha River acclimation facility to the Imnaha River juvenile migration trap. (3) Monitor the daily catch and biological characteristics of juvenile Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River screw trap. (4) Determine spring emigration timing of Naco x (Chinook salmon) and Heeyey (steelhead) smolts collected at the Imnaha River juvenile migration trap. (5) Compare emigration characteristics and survival rates of natural fall and spring tagged juvenile Naco x (Chinook salmon). (6) Determine arrival timing, travel time and estimated survival of PIT tagged natural and hatchery Naco x (Chinook salmon) and natural and hatchery Heeyey (steelhead) smolts from the Imnaha River to Snake and Columbia River dams.« less

  14. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  15. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  16. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  17. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport...

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petrosky, Charles E.; Holubetz, Terry B.

    The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancementmore » project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.« less

  19. Emigration of Natural and Hatchery Chinook Salmon and Steelhead Smolts from the Imnaha River, Oregon, 1998-1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cleary, Peter J.; Blenden, Michael L.; Kucera, Paul A.

    2002-08-01

    This report summarizes the results of the Lower Snake River Compensation Plan Hatchery Evaluation Studies (LSRCP) and the Imnaha Smolt Monitoring Program (SMP) for the 1999 smolt migration from the Imnaha River, Oregon. These studies were designed and closely coordinated to provide information about juvenile natural and hatchery chinook salmon (Oncorhynchus tshawytscha) and steelhead (Oncorhynchus mykiss) biological characteristics, behavior and emigrant timing, survival, arrival timing and travel time to the Snake River dams and McNary Dam on the Columbia River. Data collected from these studies are shared with the Fish Passage Center (FPC). These data are essential to quantify smoltmore » survival rates under the current passage conditions and to evaluate the future recovery strategies that seek to optimize smolt survival through the hydroelectric system. Information shared with the FPC assists with in-season shaping of flow and spill management requests in the Snake River reservoirs. The Bonneville Power Administration and the United States Fish and Wildlife Service contracted the Nez Perce Tribe (NPT) to monitor emigration timing and tag 21,200 emigrating natural and hatchery chinook salmon and steelhead smolts from the Imnaha River during the spring emigration period (March 1-June 15) with passive integrated transponder (PIT) tags. The completion of trapping in the spring of 1999 marked the eighth year of emigration studies on the Imnaha River and the sixth year of participating in the FPC smolt monitoring program. Monitoring and evaluation objectives were to: (1) Determine spring emigration timing of chinook salmon and steelhead smolts collected at the Imnaha River trap. (2) Evaluate effects of flow, temperature and other environmental factors on emigration timing. (3) Monitor the daily catch and biological characteristics of juvenile chinook salmon and steelhead smolts collected at the Imnaha River screw trap. (4) Determine emigration timing, travel time, and in-river survival of PIT tagged hatchery chinook salmon smolts released at the Imnaha River acclimation facility to the Imnaha River Trap. (5) Determine arrival timing, travel time and estimated survival of PIT tagged hatchery and natural chinook salmon and natural and hatchery steelhead smolts from the Imnaha River to Snake and Columbia river dams.« less

  20. Orange County intelligent vehicle/highway systems study : IVHS action plan

    DOT National Transportation Integrated Search

    1997-01-21

    This report is a result of the efforts undertaken for Task 6 of the Orange County : Intelligent Vehicle-Highway Systems (IVHS) Study, the development of an Action Plan for : implementation of the Orange County IVHS Master Plan.

  1. Strategic Planning for Computer-Based Educational Technology.

    ERIC Educational Resources Information Center

    Bozeman, William C.

    1984-01-01

    Offers educational practitioners direction for the development of a master plan for the implementation and application of computer-based educational technology by briefly examining computers in education, discussing organizational change from a theoretical perspective, and presenting an overview of the planning strategy known as the planning and…

  2. 46 CFR 122.503 - Voyage plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Voyage plan. 122.503 Section 122.503 Shipping COAST... Emergencies § 122.503 Voyage plan. (a) The master of the following vessels shall prepare a voyage plan: (1) A... United States Great Lakes port from a Canadian Great Lakes port. (b) The voyage plan required by...

  3. Institutional Repositories: The Experience of Master's and Baccalaureate Institutions

    ERIC Educational Resources Information Center

    Markey, Karen; St. Jean, Beth; Soo, Young Rieh; Yakel, Elizabeth; Kim, Jihyun

    2008-01-01

    In 2006, MIRACLE Project investigators censused library directors at all U.S. academic institutions about their activities planning, pilot testing, and implementing the institutional repositories on their campuses. Out of 446 respondents, 289 (64.8 percent) were from master's and baccalaureate institutions (M&BIs) where few operational…

  4. Seasonal use of shallow water habitat in the Lower Snake River reservoirs by juvenile fall Chinook salmon

    USGS Publications Warehouse

    Tiffan, Kenneth F.; Connor, William P.

    2012-01-01

    The U.S. Army Corps of Engineers (COE) is preparing a long term management plan for sediments that affect the authorized project purposes of the Lower Granite, Little Goose, Lower Monumental, and Ice Harbor reservoirs (hereafter, the lower Snake River reservoirs), and the area from the mouth of the Snake River to Ice Harbor Dam. We conducted a study from spring 2010 through winter 2011 to describe the habitat use by juvenile Chinook salmon within a selected group of shallow water habitat complexes (< 6 m deep) in the lower Snake River reservoirs to help inform the long-term plan. Natural fry and parr were present within all four shallow water habitat complexes that we studied from early spring through early summer, and parr ( = 40,345 ± 18,800 [error bound]) were more abundant than fry ( = 24,615 ± 5,701). Water < 2 m deep was highly used for rearing by natural fall Chinook salmon subyearlings (fry and parr combined; hereafter natural subyearlings) based on duration of use and relative group abundances during spring and summer, whereas the 2–6 m depth interval was more highly used by migratory hatchery fall Chinook salmon subyearlings and spring, summer, and fall Chinook salmon yearlings. Overall mean spring-summer apparent density of natural subyearlings was 15.5 times higher within the < 2 m depth interval than within the 2–6 m depth interval. Density of natural subyearlings also decreased as the distance a given shallow water habitat complex was located from the riverine spawning areas increased. Reservoir-type juveniles (or fish likely destined to become reservoir-type juveniles) were present in the lower Snake River reservoirs from fall 2010 through winter 2011; however, use of shallow water habitat by reservoir-type juveniles was limited during our study. We only collected 38 reservoir-type juveniles in shallow water habitat sites in beach and lampara seines during the fall. Radiotelemetry data revealed that though many tagged fish passed shallow water habitat sites, relatively few fish entered them and the median time fish spent within a given site was less than 1.4 h. Fish located by mobile tracking away from study sites were pelagically oriented, and generally not found over shallow water or close to shore. The findings in this report: (1) support the selection of natural fall Chinook subyearlings as the indicator group for determining the potential benefits of using dredge spoils to create shallow water habitat, (2) provide evidence for shallow water habitat use by natural subyearlings, (3) provide evidence against large-scale use of shallow water habitat by reservoir-type juveniles, (4) suggest that the depth criterion for defining shallow water habitat (i.e., < 6 m deep) warrants reconsideration, and (5) provide guidance for when to dredge and create shallow water habitat. Future research on habitat preference, feeding ecology, the food web, and intra-specific competition would help to better inform the long-term management plan.

  5. A Planning Guide for Instructional Networks, Part I.

    ERIC Educational Resources Information Center

    Daly, Kevin F.

    1994-01-01

    Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)

  6. DCASR (Defense Contract Administration Services Region) Boston, Strategic/Total Quality Management Master Plan Using Management by Planning (MBP)

    DTIC Science & Technology

    1989-06-01

    employees. A policy consists of targets, plans, and target values. Policy Deployment: One English translation for hoshin kanri . (Others are management by...policy and hoshin planning.) Policy deployment orchestrates continuous improvement in a way that fosters individual initiative and alignment. Process

  7. 46 CFR 154.1816 - Cargo location plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Cargo location plan. 154.1816 Section 154.1816 Shipping... FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Operations § 154.1816 Cargo location plan. The master shall ensure that: (a) A cargo location plan is prepared that gives: (1) The location and...

  8. 50 CFR Table 3 to Part 226 - Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon 3 Table 3 to... Spring/Summer and Fall Chinook Salmon Hydrologic unit name Hydrologic unit number Sockeye salmon Spring/summer chinook salmon Fall chinook salmon Hells Canyon 17060101 17060101 Imnaha 17060102 17060102 Lower...

  9. 50 CFR Table 3 to Part 226 - Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon 3 Table 3 to... Spring/Summer and Fall Chinook Salmon Hydrologic unit name Hydrologic unit number Sockeye salmon Spring/summer chinook salmon Fall chinook salmon Hells Canyon 17060101 17060101 Imnaha 17060102 17060102 Lower...

  10. 50 CFR Table 3 to Part 226 - Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon 3 Table 3 to... Spring/Summer and Fall Chinook Salmon Hydrologic unit name Hydrologic unit number Sockeye salmon Spring/summer chinook salmon Fall chinook salmon Hells Canyon 17060101 17060101 Imnaha 17060102 17060102 Lower...

  11. 36 CFR 294.29 - List of designated Idaho Roadless Areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Perce Rapid River 922 X X Nez Perce Salmon Face 855 X Nez Perce Selway Bitterroot X Nez Perce Silver... Payette Snowbank 924 X Payette Sugar Mountain 014 X Salmon Agency Creek 512 X X Salmon Allan Mountain 946 X X Salmon Anderson Mountain 942 X Salmon Blue Joint Mountain 941 X Salmon Camas Creek 901 X Salmon...

  12. Biennial Report of Progress under and Compliance with the Master Plan for Vocational Education and an Evaluation of Vocational Education Programs, as Reported by the State Board of Education. Submitted to the Governor, Lieutenant Governor, Speaker of the House, Seventy-First Texas Legislature, and the Texas Council on Vocational Education, 1987-1988.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    This biennial report presents: (1) information regarding progress under and compliance with the master plan for vocational education in Texas during the school years 1986-87 and 1987-88 and information regarding activities conducted during the 1988-89 school year where appropriate; and (2) quantitative and qualitative evaluative information on…

  13. Predation on Chinook Salmon parr by hatchery salmonids and Fallfish in the Salmon River, New York

    USGS Publications Warehouse

    Johnson, James H.; Nack, Christopher C.; Chalupnicki, Marc; Abbett, Ross; McKenna, James E.

    2016-01-01

    Naturally reproduced Chinook Salmon Oncorhynchus tshawytscha contribute substantially to the fishery in Lake Ontario. The Salmon River, a Lake Ontario tributary in New York, produces the largest numbers of naturally spawned Chinook Salmon, with parr abundance in the river often exceeding 10 million. In the spring of each year, large numbers of hatchery salmonid yearlings—potential predators of Chinook Salmon parr—are released into the Salmon River by the New York State Department of Environmental Conservation. We sought to examine predation on Chinook Salmon parr in the Salmon River during May and June prior to out-migration. Over the 4 years examined (2009–2012), annual consumption of Chinook Salmon parr by hatchery-released yearling steelhead O. mykiss and Coho Salmon O. kisutch ranged from 1.5 to 3.3 million and from 0.4 to 2.1 million, respectively. In 2009, Fallfish Semotilus corporalis were estimated to consume 2.9 million Chinook Salmon parr. Predation was higher in May, when the average TL of Chinook Salmon parr was 44.5 mm, than in June. Fallfish were also important predators of naturally reproduced steelhead subyearlings, consuming an estimated 800,000 steelhead in 2009. Hatchery-released yearling salmonids consumed 13.8–15.3% of the Chinook Salmon parr that were estimated to be present in the Salmon River during 2010–2012. Earlier releases of hatchery salmonid yearlings could reduce the riverine consumption of Chinook Salmon parr by facilitating the out-migration of yearlings prior to Chinook Salmon emergence.

  14. From trees to seas--Marbled Murrelet numbers are down

    Treesearch

    Martin G. Raphael; Gary A. Falxa; Joan O' Callaghan

    2013-01-01

    In 1992, the marbled murrelet population in the Pacific Northwest was listed as threatened under the federal Endangered Species Act, along with the northern spotted owl and Pacific salmon. These designations were embodied in the 1994 Northwest Forest Plan, which takes an ecosystem approach to managing about 25 million acres of federal lands, with a goal of...

  15. 76 FR 8345 - Endangered and Threatened Species; Recovery Plan Module for Columbia River Estuary Salmon and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ..., 6:30-8:30 p.m. Vancouver, WA, January 31, 2008, at the Water Resources Education Center, 6:30-8:30 p... influenced by Columbia River tributary/ mainstem water withdrawals and other water management actions in... River tributary/ mainstem water withdrawals and other water management actions in tributaries. Flow...

  16. A systematic surveillance programme for infectious salmon anaemia virus supports its absence in the Pacific Northwest of the United States

    USGS Publications Warehouse

    Gustafson, Lori L.; Creekmore, Lynn H.; Snekvik, Kevin R.; Ferguson, Jayde A.; Warg, Janet V.; Blair, Marilyn; Meyers, Theodore R.; Stewart, Bruce; Warheit, Kenneth I.; Kerwin, John; Goodwin, Andrew E.; Rhodes, Linda D.; Whaley, Janet E.; Purcell, Maureen K.; Bentz, Collette; Shasa, Desiree; Bader, Joel; Winton, James R.

    2018-01-01

    In response to reported findings of infectious salmon anaemia virus (ISAV) in British Columbia (BC), Canada, in 2011, U.S. national, state and tribal fisheries managers and fish health specialists developed and implemented a collaborative ISAV surveillance plan for the Pacific Northwest region of the United States. Accordingly, over a 3-1/2-year period, 4,962 salmonids were sampled and successfully tested by real-time reverse-transcription PCR. The sample set included multiple tissues from free-ranging Pacific salmonids from coastal regions of Alaska and Washington and farmed Atlantic salmon (Salmo salar L.) from Washington, all representing fish exposed to marine environments. The survey design targeted physiologically compromised or moribund animals more vulnerable to infection as well as species considered susceptible to ISAV. Samples were handled with a documented chain of custody and testing protocols, and criteria for interpretation of test results were defined in advance. All 4,962 completed tests were negative for ISAV RNA. Results of this surveillance effort provide sound evidence to support the absence of ISAV in represented populations of free-ranging and marine-farmed salmonids on the northwest coast of the United States.

  17. A systematic surveillance programme for infectious salmon anaemia virus supports its absence in the Pacific Northwest of the United States.

    PubMed

    Gustafson, L L; Creekmore, L H; Snekvik, K R; Ferguson, J A; Warg, J V; Blair, M; Meyers, T R; Stewart, B; Warheit, K I; Kerwin, J; Goodwin, A E; Rhodes, L D; Whaley, J E; Purcell, M K; Bentz, C; Shasa, D; Bader, J; Winton, J R

    2018-02-01

    In response to reported findings of infectious salmon anaemia virus (ISAV) in British Columbia (BC), Canada, in 2011, U.S. national, state and tribal fisheries managers and fish health specialists developed and implemented a collaborative ISAV surveillance plan for the Pacific Northwest region of the United States. Accordingly, over a 3-1/2-year period, 4,962 salmonids were sampled and successfully tested by real-time reverse-transcription PCR. The sample set included multiple tissues from free-ranging Pacific salmonids from coastal regions of Alaska and Washington and farmed Atlantic salmon (Salmo salar L.) from Washington, all representing fish exposed to marine environments. The survey design targeted physiologically compromised or moribund animals more vulnerable to infection as well as species considered susceptible to ISAV. Samples were handled with a documented chain of custody and testing protocols, and criteria for interpretation of test results were defined in advance. All 4,962 completed tests were negative for ISAV RNA. Results of this surveillance effort provide sound evidence to support the absence of ISAV in represented populations of free-ranging and marine-farmed salmonids on the northwest coast of the United States. © 2017 John Wiley & Sons Ltd.

  18. SU-E-T-628: A Cloud Computing Based Multi-Objective Optimization Method for Inverse Treatment Planning.

    PubMed

    Na, Y; Suh, T; Xing, L

    2012-06-01

    Multi-objective (MO) plan optimization entails generation of an enormous number of IMRT or VMAT plans constituting the Pareto surface, which presents a computationally challenging task. The purpose of this work is to overcome the hurdle by developing an efficient MO method using emerging cloud computing platform. As a backbone of cloud computing for optimizing inverse treatment planning, Amazon Elastic Compute Cloud with a master node (17.1 GB memory, 2 virtual cores, 420 GB instance storage, 64-bit platform) is used. The master node is able to scale seamlessly a number of working group instances, called workers, based on the user-defined setting account for MO functions in clinical setting. Each worker solved the objective function with an efficient sparse decomposition method. The workers are automatically terminated if there are finished tasks. The optimized plans are archived to the master node to generate the Pareto solution set. Three clinical cases have been planned using the developed MO IMRT and VMAT planning tools to demonstrate the advantages of the proposed method. The target dose coverage and critical structure sparing of plans are comparable obtained using the cloud computing platform are identical to that obtained using desktop PC (Intel Xeon® CPU 2.33GHz, 8GB memory). It is found that the MO planning speeds up the processing of obtaining the Pareto set substantially for both types of plans. The speedup scales approximately linearly with the number of nodes used for computing. With the use of N nodes, the computational time is reduced by the fitting model, 0.2+2.3/N, with r̂2>0.99, on average of the cases making real-time MO planning possible. A cloud computing infrastructure is developed for MO optimization. The algorithm substantially improves the speed of inverse plan optimization. The platform is valuable for both MO planning and future off- or on-line adaptive re-planning. © 2012 American Association of Physicists in Medicine.

  19. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING GENERAL PLAN AND ELEVATION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. Linking physical monitoring to coho and Chinook salmon populations in the Redwood Creek Watershed, California—Summary of May 3–4, 2012 Workshop

    USGS Publications Warehouse

    Madej, Mary Ann; Torregrosa, Alicia; Woodward, Andrea

    2012-01-01

    On Thursday, May 3, 2012, a science workshop was held at the Redwood National and State Parks (RNSP) office in Arcata, California, with researchers and resource managers working in RNSP to share data and expert opinions concerning salmon populations and habitat in the Redwood Creek watershed. The focus of the workshop was to discuss how best to synthesize physical and biological data related to the freshwater and estuarine phases of salmon life cycles in order to increase the understanding of constraints on salmon populations. The workshop was hosted by the U.S. Geological Survey (USGS) Status and Trends (S&T) Program National Park Monitoring Project (http://www.fort.usgs.gov/brdscience/ParkMonitoring.htm), which supports USGS research on priority topics (themes) identified by the National Park Service (NPS) Inventory and Monitoring Program (I&M) and S&T. The NPS has organized more than 270 parks with significant natural resources into 32 Inventory and Monitoring (I&M) Networks (http://science.nature.nps.gov/im/networks.cfm) that share funding and core professional staff to monitor the status and long-term trends of selected natural resources (http://science.nature.nps.gov/im/monitor). All 32 networks have completed vital signs monitoring plans (available at http://science.nature.nps.gov/im/monitor/MonitoringPlans.cfm), containing background information on the important resources of each park, conceptual models behind the selection of vital signs for monitoring the condition of natural resources, and the selection of high priority vital signs for monitoring. Vital signs are particular physical, chemical, and biological elements and processes of park ecosystems that represent the overall health or condition of the park, known or hypothesized effects of stressors, or elements that have important human values (Fancy and others, 2009). Beginning in 2009, the I&M program funded projects to analyze and synthesize the biotic and abiotic data generated by vital signs monitoring and previous in-park natural resource monitoring and inventories to provide useful information, models, and tools to park managers for addressing resource management issues. The workshop described in this report is an element of the project funded by USGS NPS-I&M program to conduct a synthesis of salmon-related datasets in the Klamath (KLMN) and San Francisco Bay Area (SFAN) networks of national parks. The synthesis focused on four park units: Redwood National Park (KLMN), Point Reyes National Seashore, Muir Woods National Monument, and Golden Gate National Recreation Area (SFAN).

  1. Master-slave control with trajectory planning and Bouc-Wen model for tracking control of piezo-driven stage

    NASA Astrophysics Data System (ADS)

    Lu, Xiaojun; Liu, Changli; Chen, Lei

    2018-04-01

    In this paper, a redundant Piezo-driven stage having 3RRR compliant mechanism is introduced, we propose the master-slave control with trajectory planning (MSCTP) strategy and Bouc-Wen model to improve its micro-motion tracking performance. The advantage of the proposed controller lies in that its implementation only requires a simple control strategy without the complexity of modeling to avoid the master PEA's tracking error. The dynamic model of slave PEA system with Bouc-Wen hysteresis is established and identified via particle swarm optimization (PSO) approach. The Piezo-driven stage with operating period T=1s and 2s is implemented to track a prescribed circle. The simulation results show that MSCTP with Bouc-Wen model reduces the trajectory tracking errors to the range of the accuracy of our available measurement.

  2. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; and (5) In the case of a proposed project for airport master planning in a large or medium air traffic hub, in the opinion of the Administrator— (i) There is an appropriate system plan identifying the need for the airport; (ii) The absence of a system plan is due to the failure of the responsible planning...

  3. Competition between Asian pink salmon (Oncorhynchus gorbuscha) and Alaskan sockeye salmon (O. nerka) in the North Pacific Ocean

    USGS Publications Warehouse

    Ruggerone, G.T.; Zimmermann, M.; Myers, K.W.; Nielsen, J.L.; Rogers, D.E.

    2003-01-01

    The importance of interspecific competition as a mechanism regulating population abundance in offshore marine communities is largely unknown. We evaluated offshore competition between Asian pink salmon and Bristol Bay (Alaska) sockeye salmon, which intermingle in the North Pacific Ocean and Bering Sea, using the unique biennial abundance cycle of Asian pink salmon from 1955 to 2000. Sockeye salmon growth during the second and third growing seasons at sea, as determined by scale measurements, declined significantly in odd-numbered years, corresponding to years when Asian pink salmon are most abundant. Bristol Bay sockeye salmon do not interact with Asian pink salmon during their first summer and fall seasons and no difference in first year scale growth was detected. The interaction with odd-year pink salmon led to significantly smaller size at age of adult sockeye salmon, especially among younger female salmon. Examination of sockeye salmon smolt to adult survival rates during 1977-97 indicated that smolts entering the ocean during even-numbered years and interacting with abundant odd-year pink salmon during the following year experienced 26% (age-2 smolt) to 45% (age-1 smolt) lower survival compared with smolts migrating during odd-numbered years. Adult sockeye salmon returning to Bristol Bay from even-year smolt migrations were 22% less abundant (reduced by 5.9 million fish per year) compared with returns from odd-year migrations. The greatest reduction in adult returns occurred among adults spending 2 compared with 3 years at sea. Our new evidence for interspecific competition highlights the need for multispecies, international management of salmon production, including salmon released from hatcheries into the ocean.

  4. Retrospective analysis of AYK Chinook salmon growth

    USGS Publications Warehouse

    Ruggerone, Gregory T.; Nielsen, Jennifer L.; Agler, B.A.

    2007-01-01

    Harvests of Yukon and Kuskokwim Chinook salmon declined significantly during 1998- 2002 in response to fewer returning salmon. Factors affecting the decline in Chinook salmon abundance are largely unknown. Growth of salmon in freshwater and the ocean is generally thought to influence salmon survival, therefore we examined historical Chinook salmon catch trends and developed growth indices of age-1.3 and age-1.4 Yukon and Kuskokwim Chinook salmon during each year and life stage in freshwater and the ocean, 1964-2004, using measurements of salmon scale growth. Availability of Yukon scales was greater than that of Kuskokwim scales during 1964-2004.Harvests of Yukon and Kuskokwim Chinook salmon rapidly increased in the mid-1970s, then rapidly declined in the late 1990s, apparently in response to the 1976/77 ocean regime shift and the 1997/98 El Nino event. Runs of Nushagak District Chinook salmon (Bristol Bay) also appeared to have been affected by these events in addition to the 1989 regime shift. The rapid responses of Chinook salmon abundance to climate change suggest late life stages were primarily affected, at least initially. Therefore, we searched for Chinook salmon growth patterns that might be related to changes in climate.

  5. Diet composition and feeding periodicity of wild and hatchery subyearling Chinook salmon in Lake Ontario

    USGS Publications Warehouse

    Johnson, J. H.

    2008-01-01

    Diel feeding periodicity, daily ration, and diet composition of wild and hatchery subyearling Chinook salmon Oncorhynchus tshawytscha were examined in Lake Ontario and the Salmon River, New York. The diet of wild riverine salmon was composed mainly of aquatic invertebrates (63.4%), mostly ephemeropterans (25.8%), chiromomids (15.8%), and trichopterans (8.3%). The diet of riverine Chinook was more closely associated with the composition of drift samples rather than bottom samples, suggesting mid-water feeding. In Lake Ontario terrestrial invertebrates were more important in the diet of hatchery Chinook (49.0%) than wild salmon (30.5%) and diet overlap between hatchery and wild salmon was low (0.46%). The diet of both hatchery and wild Chinook salmon was more closely associated with the composition of mid-water invertebrate samples rather than benthic core samples, indicating mid-water and surface feeding. Hatchery Chinook salmon consumed significantly less food (P < 0.05) than wild Chinook salmon in the lake and in the river, and wild salmon from Lake Ontario consumed more food than wild salmon in the Salmon River. Peak feeding of wild Chinook salmon occurred between 1200-1600 hours in Lake Ontario and between 1600-2000 hours in the Salmon River; there was no discernable feeding peak for the hatchery Chinook in Lake Ontario. Hatchery Chinook salmon also had the least diverse diet over the 24-hour sample period. These results suggest that at 7 days post-stocking hatchery Chinook salmon had not yet fully adapted to their new environment.

  6. Evidence for competition at sea between Norton Sound chum salmon and Asian hatchery chum salmon

    USGS Publications Warehouse

    Ruggerone, Gregory T.; Agler, B.A.; Nielsen, Jennifer L.

    2012-01-01

    Increasing production of hatchery salmon over the past four decades has led to concerns about possible density-dependent effects on wild Pacific salmon populations in the North Pacific Ocean. The concern arises because salmon from distant regions overlap in the ocean, and wild salmon populations having low productivity may compete for food with abundant hatchery populations. We tested the hypothesis that adult length-at-age, age-at-maturation, productivity, and abundance of a Norton Sound, Alaska, chum salmon population were influenced by Asian hatchery chum salmon, which have become exceptionally abundant and surpassed the abundance of wild chum salmon in the North Pacific beginning in the early 1980s. We found that smaller adult length-at-age, delayed age-at-maturation, and reduced productivity and abundance of the Norton Sound salmon population were associated with greater production of Asian hatchery chum salmon since 1965. Modeling of the density-dependent relationship, while controlling for other influential variables, indicated that an increase in adult hatchery chum salmon abundance from 10 million to 80 million adult fish led to a 72% reduction in the abundance of the wild chum salmon population. These findings indicate that competition with hatchery chum salmon contributed to the low productivity and abundance of Norton Sound chum salmon, which includes several stocks that are classified as Stocks of Concern by the State of Alaska. This study provides new evidence indicating that large-scale hatchery production may influence body size, age-at-maturation, productivity and abundance of a distant wild salmon population.

  7. An Optimal Program Initiative Selection Model for USMC Program Objective Memorandum Planning

    DTIC Science & Technology

    1993-03-01

    Programming, Master’s Thesis, Naval Postgraduate School, Monterey, CA, September, 1992. 7. Anderson, S.M., Captain, USA, A Goal Programming R&D Project Funding ... Model of the U.S. Army Strategic Defense Command Using the Analytic Hierarchy Process, Master’s Thesis, Naval Postgraduate School, Monterey, CA

  8. 76 FR 60451 - Questa Ranger District, Carson National Forest; Taos County, NM; Taos Ski Valley's 2010 Master...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... (TSV) 2010 Master Development Plan (MDP). The proposed projects include: Adding new lifts to serve terrain that is currently only accessible by hiking; replacing old lifts; creating new gladed terrain... Adventure Center (snowtubing and snowshoeing trails); and developing a lift-served mountain biking trail...

  9. Comment on "Declining wild salmon populations in relation to parasites from farm salmon".

    PubMed

    Riddell, Brian E; Beamish, Richard J; Richards, Laura J; Candy, John R

    2008-12-19

    Krkosek et al. (Reports, 14 December 2007, p. 1772) claimed that sea lice spread from salmon farms placed wild pink salmon populations "on a trajectory toward rapid local extinction." Their prediction is inconsistent with observed pink salmon returns and overstates the risks from sea lice and salmon farming.

  10. Genetic variation in chinook, Oncorhynchus tshawytscha, and coho, O. Kisutch

    USGS Publications Warehouse

    Reisenbichler, R.R.; Phelps, S.R.

    1987-01-01

    We used starch-gel electrophoresis to genetically characterize the populations of chinook salmon, Oncorhynchus tshawytscha, and coho salmon, O. kisutch, in the major drainages of the north coast of Washington (the Quillayute, Uoh, Queets, and Quinault Rivers). Of 55 loci examined for electrophoretically detectable variation. 6 were polymorphic (frequency of the common allele was less than 0.95) in chinook salmon and 3 in coho salmon. Statistical tests of interdrainage and intradrainage variation for coho salmon were tenuous because most of the fish examined were from a single year class so that we could not account for variation among year classes. Nevertheless, these tests suggested that distinct stocks ofcoho salmon exist within drainages. and that variation was not significantly greater among drainages than within drainages. Interdrainage variation for wild chinook salmon was not significant. The data suggested that summer chinook salmon were electrophoretically different from fall chinook salmon, and the hatchery populations of chinook salmon were distinct from wild fish. A hatchery population developed primarily from north coast fish was electrophoretically more similar to wild chinook salmon than were the others.

  11. Planning In Rural Areas: Evaluation of The Land Resource.

    ERIC Educational Resources Information Center

    Carlson, Steven A.; Denney, Evan

    A rural land use project originated in the early 1970s when a landowner approached the University of Montana's Department of Geography asking for assistance in planning the use of more than 10,000 acres. The planning process evolved into four phases; the first three phases (biophysical assessment, capability analysis, and master planning) have…

  12. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2011-10-01 2011-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  13. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2012-10-01 2012-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  14. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  15. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2014-10-01 2014-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  16. 46 CFR 131.945 - Display of plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... § 131.945 Display of plans. Each vessel must have a permanently exhibited, for the guidance of the master and crew members, general arrangement plans showing, for each deck, the various fire-retardant... 46 Shipping 4 2013-10-01 2013-10-01 false Display of plans. 131.945 Section 131.945 Shipping COAST...

  17. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  18. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  19. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  20. 46 CFR 169.853 - Display of plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Display of plans. 169.853 Section 169.853 Shipping COAST... Tests, Drills, and Inspections § 169.853 Display of plans. (a) Each vessel of 100 gross tons and over must have permanently exhibited for the guidance of the master, general arrangement plans for each deck...

  1. Idea Notebook: Wilderness Food Planning in the Computer Age.

    ERIC Educational Resources Information Center

    Drury, Jack K.

    1986-01-01

    Explains the use of a computer as a planning and teaching tool in wilderness trip food planning. Details use of master food list and spreadsheet software such as VisiCalc to provide shopping lists for food purchasing, cost analysis, and diet analysis. (NEC)

  2. Comparative transcriptomics of Atlantic Salmo salar, chum Oncorhynchus keta and pink salmon O. gorbuscha during infections with salmon lice Lepeophtheirus salmonis.

    PubMed

    Sutherland, Ben J G; Koczka, Kim W; Yasuike, Motoshige; Jantzen, Stuart G; Yazawa, Ryosuke; Koop, Ben F; Jones, Simon R M

    2014-03-15

    Salmon species vary in susceptibility to infections with the salmon louse (Lepeophtheirus salmonis). Comparing mechanisms underlying responses in susceptible and resistant species is important for estimating impacts of infections on wild salmon, selective breeding of farmed salmon, and expanding our knowledge of fish immune responses to ectoparasites. Herein we report three L. salmonis experimental infection trials of co-habited Atlantic Salmo salar, chum Oncorhynchus keta and pink salmon O. gorbuscha, profiling hematocrit, blood cortisol concentrations, and transcriptomic responses of the anterior kidney and skin to the infection. In all trials, infection densities (lice per host weight (g)) were consistently highest on chum salmon, followed by Atlantic salmon, and lowest in pink salmon. At 43 days post-exposure, all lice had developed to motile stages, and infection density was uniformly low among species. Hematocrit was reduced in infected Atlantic and chum salmon, and cortisol was elevated in infected chum salmon. Systemic transcriptomic responses were profiled in all species and large differences in response functions were identified between Atlantic and Pacific (chum and pink) salmon. Pink and chum salmon up-regulated acute phase response genes, including complement and coagulation components, and down-regulated antiviral immune genes. The pink salmon response involved the largest and most diverse iron sequestration and homeostasis mechanisms. Pattern recognition receptors were up-regulated in all species but the active components were often species-specific. C-type lectin domain family 4 member M and acidic mammalian chitinase were specifically up-regulated in the resistant pink salmon. Experimental exposures consistently indicated increased susceptibility in chum and Atlantic salmon, and resistance in pink salmon, with differences in infection density occurring within the first three days of infection. Transcriptomic analysis suggested candidate resistance functions including local inflammation with cytokines, specific innate pattern recognition receptors, and iron homeostasis. Suppressed antiviral immunity in both susceptible and resistant species indicates the importance of future work investigating co-infections of viral pathogens and lice.

  3. Marine-derived nutrients, bioturbation, and ecosystem metabolism: reconsidering the role of salmon in streams.

    PubMed

    Holtgrieve, Gordon W; Schindler, Daniel E

    2011-02-01

    In coastal areas of the North Pacific Ocean, annual returns of spawning salmon provide a substantial influx of nutrients and organic matter to streams and are generally believed to enhance the productivity of recipient ecosystems. Loss of this subsidy from areas with diminished salmon runs has been hypothesized to limit ecosystem productivity in juvenile salmon rearing habitats (lakes and streams), thereby reinforcing population declines. Using five to seven years of data from an Alaskan stream supporting moderate salmon densities, we show that salmon predictably increased stream water nutrient concentrations, which were on average 190% (nitrogen) and 390% (phosphorus) pre-salmon values, and that primary producers incorporated some of these nutrients into tissues. However, benthic algal biomass declined by an order of magnitude despite increased nutrients. We also measured changes in stream ecosystem metabolic properties, including gross primary productivity (GPP) and ecosystem respiration (ER), from three salmon streams by analyzing diel measurements of oxygen concentrations and stable isotopic ratios (delta O-O2) within a Bayesian statistical model of oxygen dynamics. Our results do not support a shift toward higher primary productivity with the return of salmon, as is expected from a nutrient fertilization mechanism. Rather, net ecosystem metabolism switched from approximately net autotrophic (GPP > or = ER) to a strongly net heterotrophic state (GPP < ER) in response to bioturbation of benthic habitats by salmon. Following the seasonal arrival of salmon, GPP declined to <12% of pre-salmon rates, while ER increased by over threefold. Metabolism by live salmon could not account for the observed increase in ER early in the salmon run, suggesting salmon nutrients and disturbance enhanced in situ heterotrophic respiration. Salmon also changed the physical properties of the stream, increasing air-water gas exchange by nearly 10-fold during peak spawning. We suggest that management efforts to restore salmon ecosystems should consider effects on ecosystem metabolic properties and how salmon disturbance affects the incorporation of marine-derived nutrients into food webs.

  4. Forecasting aviation activity by airport

    DOT National Transportation Integrated Search

    2001-07-01

    The Federal Aviation Administration (FAA) has a responsibility to review aviation forecasts that are submitted to the agency in conjunction with airport planning, including airport master plans and environmental studies. FAA reviews such forecasts wi...

  5. Salmon lice – impact on wild salmonids and salmon aquaculture

    PubMed Central

    Torrissen, O; Jones, S; Asche, F; Guttormsen, A; Skilbrei, O T; Nilsen, F; Horsberg, T E; Jackson, D

    2013-01-01

    Salmon lice, Lepeophtheirus salmonis, are naturally occurring parasites of salmon in sea water. Intensive salmon farming provides better conditions for parasite growth and transmission compared with natural conditions, creating problems for both the salmon farming industry and, under certain conditions, wild salmonids. Salmon lice originating from farms negatively impact wild stocks of salmonids, although the extent of the impact is a matter of debate. Estimates from Ireland and Norway indicate an odds ratio of 1.1:1-1.2:1 for sea lice treated Atlantic salmon smolt to survive sea migration compared to untreated smolts. This is considered to have a moderate population regulatory effect. The development of resistance against drugs most commonly used to treat salmon lice is a serious concern for both wild and farmed fish. Several large initiatives have been taken to encourage the development of new strategies, such as vaccines and novel drugs, for the treatment or removal of salmon lice from farmed fish. The newly sequenced salmon louse genome will be an important tool in this work. The use of cleaner fish has emerged as a robust method for controlling salmon lice, and aquaculture production of wrasse is important towards this aim. Salmon lice have large economic consequences for the salmon industry, both as direct costs for the prevention and treatment, but also indirectly through negative public opinion. PMID:23311858

  6. 76 FR 20312 - Fresh and Chilled Atlantic Salmon From Norway: Extension of Time Limits for Preliminary and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-12

    ... Atlantic Salmon From Norway: Extension of Time Limits for Preliminary and Final Results of Full Third... countervailing duty (CVD) orders on fresh and chilled Atlantic salmon from Norway, pursuant to section 751(c) of... Salmon U.S., Inc. (Phoenix Salmon), a domestic interested party. Phoenix Salmon claimed interested party...

  7. Lake Roosevelt Fisheries Monitoring Program; 1988-1989 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peone, Tim L.; Scholz, Allan T.; Griffith, James R.

    1990-10-01

    In the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program (NPPC 1987), the Council directed the Bonneville Power Administration (BPA) to construct two kokanee salmon (Oncorhynchus nerka) hatcheries as partial mitigation for the loss of anadromous salmon and steelhead incurred by construction of Grand Coulee Dam [Section 903 (g)(l)(C)]. The hatcheries will produce kokanee salmon for outplanting into Lake Roosevelt as well as rainbow trout (Oncorhynchus mykiss) for the Lake Roosevelt net-pen program. In section 903 (g)(l)(E), the Council also directed BPA to fund a monitoring program to evaluate the effectiveness of the kokanee hatcheries. Themore » monitoring program included the following components: (1) a year-round, reservoir-wide, creel survey to determine angler use, catch rates and composition, and growth and condition of fish; (2) assessment of kokanee, rainbow, and walleye (Stizostedion vitreum) feeding habits and densities of their preferred prey, and; (3) a mark and recapture study designed to assess the effectiveness of different locations where hatchery-raised kokanee and net pen reared rainbow trout are released. The above measures were adopted by the Council based on a management plan, developed by the Upper Columbia United Tribes Fisheries Center, Spokane Indian Tribe, Colville Confederated Tribes, Washington Department of Wildlife, and National Park Service, that examined the feasibility of restoring and enhancing Lake Roosevelt fisheries (Scholz et al. 1986). In July 1988, BPA entered into a contract with the Spokane Indian Tribe to initiate the monitoring program. The projected duration of the monitoring program is through 1995. This report contains the results of the monitoring program from August 1988 to December 1989.« less

  8. The importance of nature's invisible fabric: food web structure mediates modeled responses to river restoration

    NASA Astrophysics Data System (ADS)

    Bellmore, R.; Benjamin, J.; Newsom, M.; Bountry, J.; Dombroski, D.

    2016-12-01

    Restoration is frequently aimed at the recovery of target species, but also influences the larger food web in which these species participate. Effects of restoration on this broader network of organisms can influence target species both directly and indirectly via changes in energy flow through food webs. To help incorporate these complexities into river restoration planning we constructed a food web model that links river food web dynamics to in-stream physical habitat and riparian vegetation conditions. We present an application of this model to the Methow River, Washington (USA), a location of on-going restoration aimed at recovering salmon. Three restoration strategies were simulated: riparian vegetation restoration, nutrient augmentation via salmon carcass addition, and floodplain reconnection. To explore how food web structure mediates responses to these actions, we modified the food web by adding populations of invasive aquatic snails and nonnative fish. Simulations suggest that floodplain reconnection may be a better strategy than carcass addition and vegetation planting for improving conditions for salmon in this river segment. However, modeled responses were strongly sensitive to changes in the structure of the food web. The addition of invasive snails and nonnative fishes modified pathways of energy through the food web, which negated restoration improvements. This finding illustrates that forecasting responses to restoration may require accounting for the structure of food webs, and that changes in this structure—as might be expected with the spread of invasive species—could compromise restoration outcomes. By elucidating the direct and indirect pathways by which restoration affects target species, dynamic food web models can improve restoration planning by fostering a deeper understanding of system connectedness and dynamics.

  9. Estuarine Ecology of Juvenile Salmon in Western Alaska: a Review

    USGS Publications Warehouse

    Zimmerman, Christian E.; Hillgruber, Nicola

    2009-01-01

    In the late 1990s and early 2000s, large declines in numbers of chum salmon Oncorhynchus keta and Chinook salmon O. tshawytscha returning to the Arctic-YukonKuskokwim (AYK) region (Alaska, USA) illuminated the need for an improved understanding of the variables controlling salmon abundance at all life stages. In addressing questions about salmon abundance, large gaps in our knowledge of basic salmon life history and the critical early marine life stage were revealed. In this paper, results from studies conducted on the estuarine ecology of juvenile salmon in western Alaska are summarized and compared, emphasizing timing and distribution during outmigration, environmental conditions, age and growth, feeding, and energy content of salmon smolts. In western Alaska, water temperature dramatically changes with season, ranging from 0°C after ice melt in late spring/early summer to 19°C in July. Juvenile salmon were found in AYK estuaries from early May until August or September, but to date no information is available on their residence duration or survival probability. Chum salmon were the most abundant juvenile salmon reported, ranging in percent catch from <0.1% to 4.7% and most research effort has focused on this species. Abundances of Chinook salmon, sockeye salmon O. nerka, and pink salmon O. gorbuscha varied among estuaries, while coho salmon O. kisutch juveniles were consistently rare, never amounting to more than 0.8% of the catch. Dietary composition of juvenile salmon was highly variable and a shift was commonly reported from epibenthic and neustonic prey in lower salinity water to pelagic prey in higher salinity water. Gaps in the knowledge of AYK salmon estuarine ecology are still evident. For example, data on outmigration patterns and residence timing and duration, rearing conditions and their effect on diet, growth, and survival are often completely lacking or available only for few selected years and sites. Filling gaps in knowledge concerning salmon use and survival in estuarine and near-shore habitats within the AYK region will aid in assessing the relative roles of all habitats (freshwater to marine) in controlling salmon abundance.

  10. History of salmon in the Great Lakes, 1850-1970

    USGS Publications Warehouse

    Parsons, John W.

    1973-01-01

    This history of the salmon in the Great Lakes describes the decline and extinction of the Atlantic salmon (Salmo salar) in Lake Ontario in the 1800's; the failure to establish, by salmon culture, permanent or sizable populations of Atlantic or Pacific salmon in any of the Great Lakes in 1867-1965; and the success of the plantings of coho (Oncorhynchus kisutch) and chinook salmon (O. tshawytsha) in the Great Lakes, in 1966-70 -- particularly in Lake Michigan. Despite plantings of 5 million fry and fingerlings from Lake Ontario stocks in 1866-84, the native Atlantic salmon in Lake Ontario became extinct in the late 1800's primarily because tributaries in which they spawned were blocked by mill dams. Plantings of 13 million chinook salmon and landlocked and anadromous forms of Atlantic salmon in Lake Ontario and the other Great Lakes in 1873-1947 failed completely. The first species to develop a self-sustaining population was the pink salmon (O. gorbuscha), which was planted in Lake Superior in 1956; however, it has not become abundant. A salmon fishery finally was established when 15 million coho salmon and 6 million chinook salmon were planted as smolt in the Great Lakes in 1966-70. In 1970, for example, 576,000 coho salmon (12% of those planted in 1969) were caught by anglers in Lake Michigan. Most weighed 5 to 10 pounds (2.3-4.5 kg). Sport fishing for salmon was fair in Lakes Superior and Huron, and poor in Lakes Erie and Ontario. By 1970, natural reproduction of coho, chinook, pink, and kokanee (O. nerka) salmon had occurred in some tributaries of one or more of the upper three Great Lakes. It is expected, however, that the sport fishery will continue to be supported almost entirely by planted fish.

  11. Piscine reovirus, but not Jaundice Syndrome, was transmissible to Chinook Salmon, Oncorhynchus tshawytscha (Walbaum), Sockeye Salmon, Oncorhynchus nerka (Walbaum), and Atlantic Salmon, Salmo salar L.

    USGS Publications Warehouse

    Garver, Kyle A.; Marty, Gary D.; Cockburn, Sarah N.; Richard, Jon; Hawley, Laura M.; Müller, Anita; Thompson, Rachel L.; Purcell, Maureen K.; Saksida, Sonja M.

    2015-01-01

    A Jaundice Syndrome occurs sporadically among sea-pen-farmed Chinook Salmon in British Columbia, the westernmost province of Canada. Affected salmon are easily identified by a distinctive yellow discolouration of the abdominal and periorbital regions. Through traditional diagnostics, no bacterial or viral agents were cultured from tissues of jaundiced Chinook Salmon; however, piscine reovirus (PRV) was identified via RT-rPCR in all 10 affected fish sampled. By histopathology, Jaundice Syndrome is an acute to peracute systemic disease, and the time from first clinical signs to death is likely <48 h; renal tubular epithelial cell necrosis is the most consistent lesion. In an infectivity trial, Chinook Salmon, Sockeye Salmon and Atlantic Salmon, intraperitoneally inoculated with a PRV-positive organ homogenate from jaundiced Chinook Salmon, developed no gross or microscopic evidence of jaundice despite persistence of PRV for the 5-month holding period. The results from this study demonstrate that the Jaundice Syndrome was not transmissible by injection of material from infected fish and that PRV was not the sole aetiological factor for the condition. Additionally, these findings showed the Pacific coast strain of PRV, while transmissible, was of low pathogenicity for Atlantic Salmon, Chinook Salmon and Sockeye Salmon.

  12. Piscine reovirus, but not Jaundice Syndrome, was transmissible to Chinook Salmon, Oncorhynchus tshawytscha (Walbaum), Sockeye Salmon, Oncorhynchus nerka (Walbaum), and Atlantic Salmon, Salmo salar L.

    PubMed

    Garver, K A; Marty, G D; Cockburn, S N; Richard, J; Hawley, L M; Müller, A; Thompson, R L; Purcell, M K; Saksida, S

    2016-02-01

    A Jaundice Syndrome occurs sporadically among sea-pen-farmed Chinook Salmon in British Columbia, the westernmost province of Canada. Affected salmon are easily identified by a distinctive yellow discolouration of the abdominal and periorbital regions. Through traditional diagnostics, no bacterial or viral agents were cultured from tissues of jaundiced Chinook Salmon; however, piscine reovirus (PRV) was identified via RT-rPCR in all 10 affected fish sampled. By histopathology, Jaundice Syndrome is an acute to peracute systemic disease, and the time from first clinical signs to death is likely <48 h; renal tubular epithelial cell necrosis is the most consistent lesion. In an infectivity trial, Chinook Salmon, Sockeye Salmon and Atlantic Salmon, intraperitoneally inoculated with a PRV-positive organ homogenate from jaundiced Chinook Salmon, developed no gross or microscopic evidence of jaundice despite persistence of PRV for the 5-month holding period. The results from this study demonstrate that the Jaundice Syndrome was not transmissible by injection of material from infected fish and that PRV was not the sole aetiological factor for the condition. Additionally, these findings showed the Pacific coast strain of PRV, while transmissible, was of low pathogenicity for Atlantic Salmon, Chinook Salmon and Sockeye Salmon. © 2015 John Wiley & Sons Ltd.

  13. Upstream movements of Atlantic Salmon in the Lower Penobscot River, Maine following two dam removals and fish passage modifications

    USGS Publications Warehouse

    Izzo, Lisa K.; Maynard, George A.; Zydlewski, Joseph D.

    2016-01-01

    The Penobscot River Restoration Project (PRRP), to be completed in 2016, involved an extensive plan of dam removal, increases in hydroelectric capacity, and fish passage modifications to increase habitat access for diadromous species. As part of the PRRP, Great Works and Veazie dams were removed, making Milford Dam the first impediment to federally endangered Atlantic Salmon Salmo salar. Upstream habitat access for Atlantic Salmon is dependent upon successful and timely passage at Milford Dam because nearly all suitable spawning habitat is located upstream. In 2014 and 2015, a total of 73 adult salmon were radio-tagged to track their upstream movements through the Penobscot River to assess potential delays at (1) the dam remnants, (2) the confluence of the Stillwater Branch and the main stem of the Penobscot River below the impassable Orono Dam, and (3) the Milford Dam fish lift (installed in 2014). Movement rates through the dam remnants and the Stillwater confluence were comparable to open river reaches. Passage efficiency of the fish lift was high in both years (95% and 100%). However, fish experienced long delays at Milford Dam, with approximately one-third of fish taking more than a week to pass in each year, well below the Federal Energy Regulatory Commission passage standard of 95% within 48 h. Telemetry indicates most fish locate the fishway entrance within 5 h of arrival and were observed at the entrance at all hours of the day. These data indicate that overall transit times through the lower river were comparable to reported movement rates prior to changes to the Penobscot River due to the substantial delays seen at Milford Dam. The results of this study show that while adult Atlantic Salmon locate the new fish lift entrance quickly, passage of these fish was significantly delayed under 2014–2015 operations.

  14. 50 CFR 660.402 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (dog) salmon, Oncorhynchus keta Sockeye (red) salmon, Oncorhynchus nerka Steelhead (rainbow trout... Region, NMFS. Salmon means any anadromous species of the family Salmonidae and genus Oncorhynchus, commonly known as Pacific salmon, including, but not limited to: Chinook (king) salmon, Oncorhynchus...

  15. Species Profiles: Life Histories and Environmental Requirements of Coastal Fishes and Invertebrates (Pacific Northwest). Coho Salmon.

    DTIC Science & Technology

    1986-04-01

    method in fingerlinqs prey on sockeye salmon Puqet Sound to predict coho salmon fry ( Oncorhynchus nerka ); 30% of catches from stream discharqe data, coho...numbers of males distinguish it from chinook salmon and females in a soawninq run are sim- ( Oncorhynchus tshawytscha), which have ilar males may...behind sockeye salmon (qnco- qoal is te umber of spawners rhynchus nerka ), pink salmon (. necesar) to majinta1n the run of a -orhuscha), and chum salmon

  16. Development of a Precipitation-Runoff Model to Simulate Unregulated Streamflow in the Salmon Creek Basin, Okanogan County, Washington

    USGS Publications Warehouse

    van Heeswijk, Marijke

    2006-01-01

    Surface water has been diverted from the Salmon Creek Basin for irrigation purposes since the early 1900s, when the Bureau of Reclamation built the Okanogan Project. Spring snowmelt runoff is stored in two reservoirs, Conconully Reservoir and Salmon Lake Reservoir, and gradually released during the growing season. As a result of the out-of-basin streamflow diversions, the lower 4.3 miles of Salmon Creek typically has been a dry creek bed for almost 100 years, except during the spring snowmelt season during years of high runoff. To continue meeting the water needs of irrigators but also leave water in lower Salmon Creek for fish passage and to help restore the natural ecosystem, changes are being considered in how the Okanogan Project is operated. This report documents development of a precipitation-runoff model for the Salmon Creek Basin that can be used to simulate daily unregulated streamflows. The precipitation-runoff model is a component of a Decision Support System (DSS) that includes a water-operations model the Bureau of Reclamation plans to develop to study the water resources of the Salmon Creek Basin. The DSS will be similar to the DSS that the Bureau of Reclamation and the U.S. Geological Survey developed previously for the Yakima River Basin in central southern Washington. The precipitation-runoff model was calibrated for water years 1950-89 and tested for water years 1990-96. The model was used to simulate daily streamflows that were aggregated on a monthly basis and calibrated against historical monthly streamflows for Salmon Creek at Conconully Dam. Additional calibration data were provided by the snowpack water-equivalent record for a SNOTEL station in the basin. Model input time series of daily precipitation and minimum and maximum air temperatures were based on data from climate stations in the study area. Historical records of unregulated streamflow for Salmon Creek at Conconully Dam do not exist for water years 1950-96. Instead, estimates of historical monthly mean unregulated streamflow based on reservoir outflows and storage changes were used as a surrogate for the missing data and to calibrate and test the model. The estimated unregulated streamflows were corrected for evaporative losses from Conconully Reservoir (about 1 ft3/s) and ground-water losses from the basin (about 2 ft3/s). The total of the corrections was about 9 percent of the mean uncorrected streamflow of 32.2 ft3/s (23,300 acre-ft/yr) for water years 1949-96. For the calibration period, the basinwide mean annual evapotranspiration was simulated to be 19.1 inches, or about 83 percent of the mean annual precipitation of 23.1 inches. Model calibration and testing indicated that the daily streamflows simulated using the precipitation-runoff model should be used only to analyze historical and forecasted annual mean and April-July mean streamflows for Salmon Creek at Conconully Dam. Because of the paucity of model input data and uncertainty in the estimated unregulated streamflows, the model is not adequately calibrated and tested to estimate monthly mean streamflows for individual months, such as during low-flow periods, or for shorter periods such as during peak flows. No data were available to test the accuracy of simulated streamflows for lower Salmon Creek. As a result, simulated streamflows for lower Salmon Creek should be used with caution. For the calibration period (water years 1950-89), both the simulated mean annual streamflow and the simulated mean April-July streamflow compared well with the estimated uncorrected unregulated streamflow (UUS) and corrected unregulated streamflow (CUS). The simulated mean annual streamflow exceeded UUS by 5.9 percent and was less than CUS by 2.7 percent. Similarly, the simulated mean April-July streamflow exceeded UUS by 1.8 percent and was less than CUS by 3.1 percent. However, streamflow was significantly undersimulated during the low-flow, baseflow-dominated months of November through F

  17. Integrated Logistics Support Plan (ILSP) for the Ports and Waterways Safety System (PAWSS) Project - A Level I Major Acquisition

    DOT National Transportation Integrated Search

    1997-09-30

    This Integrated Logistics Support Plan (ILSP) serves as the master logistics planning document that describes necessary logistic activities, assigns responsibility for those activities, and establishes a schedule for completion. It is one of the init...

  18. MONROE COMMUNITY COLLEGE CAMPUS PLAN.

    ERIC Educational Resources Information Center

    Caudill, Rowlett, Scott and Associates, Bryan, TX.

    THE MASTER PLANS FOR THE CONSTRUCTION OF THE CAMPUS OF THE NEW MONROE COMMUNITY COLLEGE INCLUDE EDUCATIONAL SPECIFICATIONS, SITE ANALYSIS DATA AND BUILDING PLANS. THE EDUCATIONAL SPECIFICATIONS ARE BASED UPON COMMUNITY NEEDS AND ENROLLMENT PROJECTIONS, AND REFLECT SPACE REQUIREMENTS. IN THE SITE ANALYSIS, FACTORS SUCH AS TOPOGRAPHY, CLIMATE,…

  19. Educational Master Planning: Creative or Cathartic?

    ERIC Educational Resources Information Center

    Rossmeier, Joseph G.

    Recently, Northern Virginia Community College has moved into a new era of institutional development, whereby primary attention to facility planning and increasing enrollments has given way to a comprehensive, program-based, and strategic planning process which transcends all elements of the institution. Recognition is given to the integral…

  20. Progress on the development of a master file of highway safety planning and evaluation data.

    DOT National Transportation Integrated Search

    1981-01-01

    The National Highway Traffic Safety Administration requires each state to submit an annual Highway Safety Plan as a prerequisite for obtaining federal section 402 safety monies. The Highway Safety Plan serves as more than a mechanism for obtaining fu...

  1. 50 CFR Table 3 to Part 226 - Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon 3 Table 3 to... Part 226—Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon Hydrologic unit name Hydrologic unit number Sockeye salmon Spring...

  2. 50 CFR Table 3 to Part 226 - Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon 3 Table 3 to... Part 226—Hydrologic Units Containing Critical Habitat for Snake River Sockeye Salmon and Snake River Spring/Summer and Fall Chinook Salmon Hydrologic unit name Hydrologic unit number Sockeye salmon Spring...

  3. [Carotenoids and vitamin A in fish].

    PubMed

    Elmadfa, I; Majchrzak, D

    1998-06-01

    Seven commercial salmon and six trout samples were investigated. Retinol and the carotenoids astaxanthin and canthaxanthin important for pigmentation of the muscle were determined by RP-HPLC. Vitamin A concentrations of raw salmon samples were 16-19 micrograms/100 g, of smoked salmon samples 9-19 micrograms/ 100 g; retinol values of salmon trout (raw) and trout (raw) reached 14-16 micrograms/100 g and 7-9 micrograms/100 g. Concentrations of astaxanthin the important carotenoid of pigmentation, ranged in samples of salmon from 310-465 micrograms/100 g. Samples of salmon trout showed astaxanthin values between 90 and 536 micrograms/100 g, trout samples only 67-85 micrograms/100 g. Concentrations of canthaxanthin were different in the examined samples and were not detectable in all samples. Highest values of canthaxanthin were found in salmon trout samples (113-226 micrograms/100 g), Irish smoked salmon and stremel-salmon (145-169 micrograms/100 g). Raw samples of salmon and of trout showed only low concentrations of canthaxanthin. Astaxanthin and canthaxanthin together reached values of 419-524 micrograms/100 g for salmon, 316-701 micrograms/100 g for salmon trout, and 72-91 micrograms/100 g for trout samples.

  4. Evaluation of a chinook salmon (Oncorhynchus tshawytscha) bioenergetics model

    USGS Publications Warehouse

    Madenjian, Charles P.; O'Connor, Daniel V.; Chernyak, Sergei M.; Rediske, Richard R.; O'Keefe, James P.

    2004-01-01

    We evaluated the Wisconsin bioenergetics model for chinook salmon (Oncorhynchus tshawytscha) in both the laboratory and the field. Chinook salmon in laboratory tanks were fed alewife (Alosa pseudoharengus), the predominant food of chinook salmon in Lake Michigan. Food consumption and growth by chinook salmon during the experiment were measured. To estimate the efficiency with which chinook salmon retain polychlorinated biphenyls (PCBs) from their food in the laboratory, PCB concentrations of the alewife and of the chinook salmon at both the beginning and end of the experiment were determined. Based on our laboratory evaluation, the bioenergetics model was furnishing unbiased estimates of food consumption by chinook salmon. Additionally, from the laboratory experiment, we calculated that chinook salmon retained 75% of the PCBs contained within their food. In an earlier study, assimilation rate of PCBs to chinook salmon from their food in Lake Michigan was estimated at 53%, thereby suggesting that the model was substantially overestimating food consumption by chinook salmon in Lake Michigan. However, we concluded that field performance of the model could not be accurately assessed because PCB assimilation efficiency is dependent on feeding rate, and feeding rate of chinook salmon was likely much lower in our laboratory tanks than in Lake Michigan.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Thom, Ronald M.; Whiting, Allan H.

    The Bonneville Power Administration (BPA), in coordination with the U. S. Army Corps of Engineers (COE) and NOAA Fisheries, originated this project (BPA Project No. 2002-076; Contract No. DE-AC06-76RL01830, Release No. 652-24). Their intent was to develop a useful habitat restoration plan for the lower Columbia River and estuary to help guide restoration efforts and fulfill Reasonable and Prudent Alternative Action 159 of the 2000 National Marine Fisheries Service Biological Opinion on operation of the Federal Columbia River Power System. This document focuses on salmon habitat, although its ecosystem-based approach necessarily affects other species as well. Salmon habitat restoration ismore » best undertaken within the context of other biota and physical processes using an ecosystem perspective. The anticipated audience for the plan includes entities responsible for, interested in, or affected by habitat restoration in the lower Columbia River and estuary. Timeframes to apply this plan extend from the immediate (2003-2004) to the near-term (2005-2006) to the long-term (2007 and beyond). We anticipate and encourage that the plan be revised as new knowledge and experience are attained. A team comprised of the Columbia River Estuary Study Taskforce (CREST), the Lower Columbia River Estuary Partnership (Estuary Partnership), and Pacific Northwest National Laboratory (PNNL) wrote this document. The BPA and the COE, as the responsible Action Agencies, provided technical oversight. The Estuary Partnership's Science Work Group, NOAA Fisheries Habitat Conservation Division, Northwest Power Planning Council (NPPC) staff, and state and tribal fisheries management agencies reviewed drafts. The Independent Scientific Advisory Board of the NPPC reviewed and commented on the 90% draft. Revisions were incorporated into the final draft document subsequently released for public review. Extensive efforts were made to ensure a sound technical and policy basis and to solicit input from all interested parties.« less

  6. 50 CFR 600.1107 - Southeast Alaska Purse Seine Salmon Fishery capacity reduction program, including fee payment and...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... examine each submitted Bid for consistency and the necessary elements, including the validity of the... finite. The failure of a Permit Holder, whose bid was accepted, to perform the obligations under the... submitted by the bidder and the SRA is an integral element of the Reduction Plan. Now, therefore, for good...

  7. 50 CFR 600.1107 - Southeast Alaska Purse Seine Salmon Fishery capacity reduction program, including fee payment and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... examine each submitted Bid for consistency and the necessary elements, including the validity of the... finite. The failure of a Permit Holder, whose bid was accepted, to perform the obligations under the... submitted by the bidder and the SRA is an integral element of the Reduction Plan. Now, therefore, for good...

  8. 50 CFR 600.1107 - Southeast Alaska Purse Seine Salmon Fishery capacity reduction program, including fee payment and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... examine each submitted Bid for consistency and the necessary elements, including the validity of the... finite. The failure of a Permit Holder, whose bid was accepted, to perform the obligations under the... submitted by the bidder and the SRA is an integral element of the Reduction Plan. Now, therefore, for good...

  9. Effects of multiple stresses hydropower, acid deposition and climate change on water chemistry and salmon populations in the River Otra, Norway.

    PubMed

    Wright, Richard F; Couture, Raoul-Marie; Christiansen, Anne B; Guerrero, José-Luis; Kaste, Øyvind; Barlaup, Bjørn T

    2017-01-01

    Many surface waters in Europe suffer from the adverse effects of multiple stresses. The Otra River, southernmost Norway, is impacted by acid deposition, hydropower development and increasingly by climate change. The river holds a unique population of land-locked salmon and anadromous salmon in the lower reaches. Both populations have been severely affected by acidification. The decrease in acid deposition since the 1980s has led to partial recovery of both populations. Climate change with higher temperatures and altered precipitation can potentially further impact fish populations. We used a linked set of process-oriented models to simulate future climate, discharge, and water chemistry at five sub-catchments in the Otra river basin. Projections to year 2100 indicate that future climate change will give a small but measureable improvement in water quality, but that additional reductions in acid deposition are needed to promote full restoration of the fish communities. These results can help guide management decisions to sustain key salmon habitats and carry out effective long-term mitigation strategies such as liming. The Otra River is typical of many rivers in Europe in that it fails to achieve the good ecological status target of the EU Water Framework Directive. The programme of measures needed in the river basin management plan necessarily must consider the multiple stressors of acid deposition, hydropower, and climate change. This is difficult, however, as the synergistic and antagonistic effects are complex and challenging to address with modelling tools currently available. Copyright © 2016 Elsevier B.V. All rights reserved.

  10. Abundance, Timing of Migration, and Egg-to-Smolt Survival of Juvenile Chum Salmon, Kwethluk River, Alaska, 2007 and 2008

    USGS Publications Warehouse

    Burril, Sean E.; Zimmerman, Christian E.; Finn, James E.; ,; Gillikin, Daniel; ,

    2010-01-01

    To better understand and partition mortality among life stages of chum salmon (Oncorhynchus keta), we used inclined-plane traps to monitor the migration of juveniles in the Kwethluk River, Alaska in 2007 and 2008. The migration of juvenile chum salmon peaked in mid-May and catch rates were greatest when water levels were rising. Movement of chum salmon was diurnal with highest catch rates occurring during the hours of low light (that is, 22:00 to 10:00). Trap efficiency ranged from 0.37 to 4.04 percent (overall efficiency = 1.94 percent). Total abundance of juvenile chum salmon was estimated to be 2.0 million fish in 2007 and 2.9 million fish in 2008. On the basis of the estimate of chum salmon females passing the Kwethluk River weir and age-specific fecundity, we estimated the potential egg deposition (PED) upstream of the weir and trapping site. Egg-to-smolt survival, calculated by dividing the estimate of juvenile chum salmon emigrating past the weir site by the estimate of PED, was 4.6 percent in 2007 and 5.2 percent in 2008. In addition to chum salmon, Chinook salmon O. tshawytscha), coho salmon (O. kisutch), sockeye salmon (O. nerka), and pink salmon (O. gorbuscha), as well as ten other fish species, were captured in the traps. As with chum salmon, catch of these species increased during periods of increasing discharge and peaked during hours of low light. This study successfully determined the characteristics of juvenile salmon migrations and estimated egg-to-smolt survival for chum salmon. This is the first estimate of survival for any juvenile salmon in the Arctic-Yukon-Kuskokwim region of Alaska and demonstrates an approach that can help to partition mortality between freshwater and marine life stages, information critical to understanding the dynamics of salmon in this region.

  11. 46 CFR 167.15-35 - Notice and plans required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SHIPS Inspections § 167.15-35 Notice and plans required. (a) The master, owner, operator, or agent of the vessel shall notify the Officer in Charge, Marine Inspection, whenever the vessel is to be...

  12. 75 FR 74740 - Measure M2 Natural Community Conservation Plan/Habitat Conservation Plan/Master Streambed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... significant direct, indirect, and cumulative impacts on biological resources, land use, air quality, water quality, water resources, socioeconomics, and other environmental issues that could occur with the...

  13. Comparative anatomy of the dorsal hump in mature Pacific salmon.

    PubMed

    Susuki, Kenta; Ban, Masatoshi; Ichimura, Masaki; Kudo, Hideaki

    2017-07-01

    Mature male Pacific salmon (Genus Oncorhynchus) demonstrate prominent morphological changes, such as the development of a dorsal hump. The degree of dorsal hump formation depends on the species in Pacific salmon. It is generally accepted that mature males of sockeye (O. nerka) and pink (O. gorbuscha) salmon develop most pronounced dorsal humps. The internal structure of the dorsal hump in pink salmon has been confirmed in detail. In this study, the dorsal hump morphologies were analyzed in four Pacific salmon species inhabiting Japan, masu (O. masou), sockeye, chum (O. keta), and pink salmon. The internal structure of the dorsal humps also depended on the species; sockeye and pink salmon showed conspicuous development of connective tissue and growth of bone tissues in the dorsal tissues. Masu and chum salmon exhibited less-pronounced increases in connective tissues and bone growth. Hyaluronic acid was clearly detected in dorsal hump connective tissue by histochemistry, except for in masu salmon. The lipid content in dorsal hump connective tissue was richer in masu and chum salmon than in sockeye and pink salmon. These results revealed that the patterns of dorsal hump formation differed among species, and especially sockeye and pink salmon develop pronounced dorsal humps through both increases in the amount of connective tissue and the growth of bone tissues. In contrast, masu and chum salmon develop their dorsal humps by the growth of bone tissues, rather than the development of connective tissue. © 2017 Wiley Periodicals, Inc.

  14. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less

  15. 77 FR 36994 - Questa Ranger District, Carson National Forest; Taos County, NM; Taos Ski Valley's 2010 Master...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... County, NM; Taos Ski Valley's 2010 Master Development Plan--Phase 1 Projects; Additional Filings AGENCY... environmental impact statement for a proposal to authorize several (Phase 1) projects included in the Taos Ski... (ROD) are expected in July 2012. Change in Responsible Official: In addition, this notice changes the...

  16. A Position and Rate Control System: An Ingredient for Budget Planning.

    ERIC Educational Resources Information Center

    Gilbert, Linda L.

    A position and rate control system was undertaken at Florida State University in 1974 to alleviate the problems of the manual budgeting system. The budget master file was created biweekly by combining a subset of the current payroll/personnel data base with the updated budget information from the previous budget master file, keying on positional…

  17. Physics Teachers: A Holistic Plan for Professional Education during Both the Pedagogical Stage and the Probation Year

    ERIC Educational Resources Information Center

    Sá, M. V.; de Almeida, M. J. B. M.

    2016-01-01

    Despite the Bologna agreement implementation in 2008, teachers' education in Portugal has not changed significantly from earlier practice. The major modification in the requirements of master's level teacher education programmes was the introduction of a strong component of educational research in a master's degree; this is designed to replace an…

  18. Risk Assessment Planning for Airborne Systems: An Information Assurance Failure Mode, Effects and Criticality Analysis Methodology

    DTIC Science & Technology

    2012-06-01

    Visa Investigate Data Breach March 30, 2012 Visa and MasterCard are investigating whether a data security breach at one of the main companies that...30). MasterCard and Visa Investigate Data Breach . New York Times . Stamatis, D. (2003). Failure Mode Effect Analysis: FMEA from Theory to Execution

  19. Can reduced predation offset negative effects of sea louse parasites on chum salmon?

    PubMed Central

    Peacock, Stephanie J.; Connors, Brendan M.; Krkošek, Martin; Irvine, James R.; Lewis, Mark A.

    2014-01-01

    The impact of parasites on hosts is invariably negative when considered in isolation, but may be complex and unexpected in nature. For example, if parasites make hosts less desirable to predators then gains from reduced predation may offset direct costs of being parasitized. We explore these ideas in the context of sea louse infestations on salmon. In Pacific Canada, sea lice can spread from farmed salmon to migrating juvenile wild salmon. Low numbers of sea lice can cause mortality of juvenile pink and chum salmon. For pink salmon, this has resulted in reduced productivity of river populations exposed to salmon farming. However, for chum salmon, we did not find an effect of sea louse infestations on productivity, despite high statistical power. Motivated by this unexpected result, we used a mathematical model to show how a parasite-induced shift in predation pressure from chum salmon to pink salmon could offset negative direct impacts of sea lice on chum salmon. This shift in predation is proposed to occur because predators show an innate preference for pink salmon prey. This preference may be more easily expressed when sea lice compromise juvenile salmon hosts, making them easier to catch. Our results indicate how the ecological context of host–parasite interactions may dampen, or even reverse, the expected impact of parasites on host populations. PMID:24352951

  20. Can reduced predation offset negative effects of sea louse parasites on chum salmon?

    PubMed

    Peacock, Stephanie J; Connors, Brendan M; Krkosek, Martin; Irvine, James R; Lewis, Mark A

    2014-02-07

    The impact of parasites on hosts is invariably negative when considered in isolation, but may be complex and unexpected in nature. For example, if parasites make hosts less desirable to predators then gains from reduced predation may offset direct costs of being parasitized. We explore these ideas in the context of sea louse infestations on salmon. In Pacific Canada, sea lice can spread from farmed salmon to migrating juvenile wild salmon. Low numbers of sea lice can cause mortality of juvenile pink and chum salmon. For pink salmon, this has resulted in reduced productivity of river populations exposed to salmon farming. However, for chum salmon, we did not find an effect of sea louse infestations on productivity, despite high statistical power. Motivated by this unexpected result, we used a mathematical model to show how a parasite-induced shift in predation pressure from chum salmon to pink salmon could offset negative direct impacts of sea lice on chum salmon. This shift in predation is proposed to occur because predators show an innate preference for pink salmon prey. This preference may be more easily expressed when sea lice compromise juvenile salmon hosts, making them easier to catch. Our results indicate how the ecological context of host-parasite interactions may dampen, or even reverse, the expected impact of parasites on host populations.

  1. Stress and reproductive hormones in grizzly bears reflect nutritional benefits and social consequences of a salmon foraging niche.

    PubMed

    Bryan, Heather M; Darimont, Chris T; Paquet, Paul C; Wynne-Edwards, Katherine E; Smits, Judit E G

    2013-01-01

    Physiological indicators of social and nutritional stress can provide insight into the responses of species to changes in food availability. In coastal British Columbia, Canada, grizzly bears evolved with spawning salmon as an abundant but spatially and temporally constrained food source. Recent and dramatic declines in salmon might have negative consequences on bear health and ultimately fitness. To examine broadly the chronic endocrine effects of a salmon niche, we compared cortisol, progesterone, and testosterone levels in hair from salmon-eating bears from coastal BC (n = 75) with the levels in a reference population from interior BC lacking access to salmon (n = 42). As predicted, testosterone was higher in coastal bears of both sexes relative to interior bears, possibly reflecting higher social density on the coast mediated by salmon availability. We also investigated associations between the amount of salmon individual bears consumed (as measured by stable isotope analysis) and cortisol and testosterone in hair. Also as predicted, cortisol decreased with increasing dietary salmon and was higher after a year of low dietary salmon than after a year of high dietary salmon. These findings at two spatial scales suggest that coastal bears might experience nutritional or social stress in response to on-going salmon declines, providing novel insights into the effects of resource availability on fitness-related physiology.

  2. Stress and Reproductive Hormones in Grizzly Bears Reflect Nutritional Benefits and Social Consequences of a Salmon Foraging Niche

    PubMed Central

    Bryan, Heather M.; Darimont, Chris T.; Paquet, Paul C.; Wynne-Edwards, Katherine E.; Smits, Judit E. G.

    2013-01-01

    Physiological indicators of social and nutritional stress can provide insight into the responses of species to changes in food availability. In coastal British Columbia, Canada, grizzly bears evolved with spawning salmon as an abundant but spatially and temporally constrained food source. Recent and dramatic declines in salmon might have negative consequences on bear health and ultimately fitness. To examine broadly the chronic endocrine effects of a salmon niche, we compared cortisol, progesterone, and testosterone levels in hair from salmon-eating bears from coastal BC (n = 75) with the levels in a reference population from interior BC lacking access to salmon (n = 42). As predicted, testosterone was higher in coastal bears of both sexes relative to interior bears, possibly reflecting higher social density on the coast mediated by salmon availability. We also investigated associations between the amount of salmon individual bears consumed (as measured by stable isotope analysis) and cortisol and testosterone in hair. Also as predicted, cortisol decreased with increasing dietary salmon and was higher after a year of low dietary salmon than after a year of high dietary salmon. These findings at two spatial scales suggest that coastal bears might experience nutritional or social stress in response to on-going salmon declines, providing novel insights into the effects of resource availability on fitness-related physiology. PMID:24312230

  3. Environmental Education in Graduate Professional Degrees: The Case of Urban Planning

    ERIC Educational Resources Information Center

    White, Stacey Swearingen; Mayo, James M.

    2005-01-01

    Environmental education (EE) is a prominent aspect of graduate-level master's programs in urban and regional planning. This article draws on the results of a survey of 66 environmental planning educators in urban and regional planning programs to show what types of EE are most prevalent in these graduate professional programs and in planning…

  4. PACIFIC SALMON: LESSONS LEARNED FOR RECOVERING ATLANTIC SALMON

    EPA Science Inventory

    n evaluation of the history of efforts to reverse the long-term decline of Pacific Salmon provides instructive policy lessons for recovering Atlantic Salmon. From California to southern British Columbia, wild runs of Pacific salmon have universally declined and many have disappe...

  5. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -1. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  6. Photographic copy of drawing by Modjeski and Masters, Engineers of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -2 AND TYPICAL SECTION THROUGH BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. The Influence of Salmon Recolonization on Riparian Communities in the Cedar River, Washington, USA

    NASA Astrophysics Data System (ADS)

    Moravek, J.; Clipp, H.; Kiffney, P.

    2016-02-01

    Salmon are a valuable resource throughout the Pacific Northwest, but increasing human activity is degrading coastal ecosystems and threatening local salmon populations. Salmon conservation efforts often focus on habitat restoration, including the re-colonization of salmon into historically obstructed areas such as the Cedar River in Washington, USA. However, to assess the long term implications of salmon re-colonization on a landscape scale, it is critical to consider not only the river ecosystem but also the surrounding riparian habitat. Although prior studies suggest that salmon alter riparian food web dynamics, the riparian community on the Cedar River has not yet been characterized. To investigate possible connections between salmon and the riparian habitat after 12 years of re-colonization, we surveyed riparian spider communities along a gradient of salmon inputs (g/m2). In 10-m transects along the banks of the river, we identified spiders and spider webs, collected prey from webs, and characterized nearby aquatic macroinvertebrate communities. We found that the density of aquatic macroinvertebrates, as well as the density of spider prey, both had significant positive relationships with salmon inputs, supporting the hypothesis that salmon provide energy and nutrients for both aquatic and riparian food webs. We also found that spider diversity significantly decreased with salmon inputs, potentially due to confounding factors such as stream gradient or vegetation structure. Although additional information is needed to fully understand this relationship, the significant connection between salmon inputs and spider diversity is compelling motivation for further studies regarding the link between aquatic and riparian systems on the Cedar River. Understanding the connections between salmon and the riparian community is critical to characterizing the long term, landscape-scale implications of sustainable salmon management in the Pacific Northwest.

  8. The Influence of Salmon Recolonization on Riparian Communities in the Cedar River, Washington, USA

    NASA Astrophysics Data System (ADS)

    Moravek, J.; Clipp, H.; Kiffney, P.

    2015-12-01

    Salmon are a valuable cultural and economic resource throughout the Pacific Northwest, but increasing human activity is degrading coastal ecosystems and threatening local salmon populations. Salmon conservation efforts often focus on habitat restoration, including the re-colonization of salmon into historically obstructed areas such as the Cedar River in Washington, USA. However, to assess the implications of salmon re-colonization on a landscape scale, it is critical to consider not only the river ecosystem but also the surrounding riparian habitat. Although prior studies suggest that salmon alter riparian food web dynamics, the riparian community on the Cedar River has not yet been characterized. To investigate possible connections between salmon and the riparian habitat, we surveyed riparian spider communities along a gradient of salmon inputs (g/m2). In 10-m transects along the banks of the river, we identified spiders and spider webs, collected prey from webs, and characterized nearby aquatic macroinvertebrate communities. We found that the density of aquatic macroinvertebrates, as well as the density of spider prey, both had significant positive relationships with salmon inputs, supporting the hypothesis that salmon provide energy and nutrients for both aquatic and riparian food webs. We also found that spider diversity significantly decreased with salmon inputs, potentially due to confounding factors such as stream gradient or vegetation structure. Although additional information is needed to fully understand this relationship, the significant connection between salmon inputs and spider diversity is compelling motivation for further studies regarding the link between aquatic and riparian systems on the Cedar River. Understanding the connections between salmon and the riparian community is critical to characterizing the landscape-scale implications of sustainable salmon management in the Pacific Northwest.

  9. 32 CFR 644.504 - Disposal plan for timber.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... merchantable dead timber will be marked for cutting in accordance with the land management plan, Master Plan, or forestry supplement thereto, and cutting will be limited to the timber so marked. The disposal... affecting the installations, and the requirements of such measures will be set forth specifically. (e) Any...

  10. PLANNING THE COMMUNITY COLLEGE.

    ERIC Educational Resources Information Center

    1967

    A COMMUNITY COLLEGE MASTER PLAN (1) SHOULD BE UNIQUE, DESIGNED FOR ITS PARTICULAR SITUATION, (2) DEVELOPS FROM AN ANALYSIS OF NEEDS, SITE, GROWTH, AND FINANCE, (3) STARTS WITH A REVIEW OF FACTS, RESOURCES, NEEDS, AND INFLUENCES, TO GIVE A FOUNDATION FOR THE CREATIVE PLANNING PROCESS, AND (4) IS INFLUENCED BY FACTORS OF EDUCATIONAL PROGRAM,…

  11. Plasticity in growth of farmed and wild Atlantic salmon: is the increased growth rate of farmed salmon caused by evolutionary adaptations to the commercial diet?

    PubMed

    Harvey, Alison Catherine; Solberg, Monica Favnebøe; Troianou, Eva; Carvalho, Gary Robert; Taylor, Martin Ian; Creer, Simon; Dyrhovden, Lise; Matre, Ivar Helge; Glover, Kevin Alan

    2016-12-01

    Domestication of Atlantic salmon for commercial aquaculture has resulted in farmed salmon displaying substantially higher growth rates than wild salmon under farming conditions. In contrast, growth differences between farmed and wild salmon are much smaller when compared in the wild. The mechanisms underlying this contrast between environments remain largely unknown. It is possible that farmed salmon have adapted to the high-energy pellets developed specifically for aquaculture, contributing to inflated growth differences when fed on this diet. We studied growth and survival of 15 families of farmed, wild and F1 hybrid salmon fed three contrasting diets under hatchery conditions; a commercial salmon pellet diet, a commercial carp pellet diet, and a mixed natural diet consisting of preserved invertebrates commonly found in Norwegian rivers. For all groups, despite equal numbers of calories presented by all diets, overall growth reductions as high 68 and 83%, relative to the salmon diet was observed in the carp and natural diet treatments, respectively. Farmed salmon outgrew hybrid (intermediate) and wild salmon in all treatments. The relative growth difference between wild and farmed fish was highest in the carp diet (1: 2.1), intermediate in the salmon diet (1:1.9) and lowest in the natural diet (1:1.6). However, this trend was non-significant, and all groups displayed similar growth reaction norms and plasticity towards differing diets across the treatments. No indication of genetic-based adaptation to the form or nutritional content of commercial salmon diets was detected in the farmed salmon. Therefore, we conclude that diet alone, at least in the absence of other environmental stressors, is not the primary cause for the large contrast in growth differences between farmed and wild salmon in the hatchery and wild. Additionally, we conclude that genetically-increased appetite is likely to be the primary reason why farmed salmon display higher growth rates than wild salmon when fed ad lib rations under hatchery conditions. Our results contribute towards an understanding of the potential genetic changes that have occurred in farmed salmon in response to domestication, and the potential mechanisms underpinning genetic and ecological interactions between farmed escapees and wild salmonids.

  12. THE FUTURE OF PACIFIC NORTHWEST SALMON: ANATOMY OF A CRISIS

    EPA Science Inventory

    Salmon are categorized biologically into two groups: Pacific salmon or Atlantic salmon. All seven species of Pacific salmon on both sides of the North Pacific Ocean have declined substantially from historic levels, but large runs still occur in northern British Columbia, Yukon,...

  13. WILD SALMON RESTORATION: IS IT WORTH IT?

    EPA Science Inventory

    Salmon are categorized biologically into two groups: Pacific salmon and Atlantic salmon. Atlantic salmon are found on both sides of the North Atlantic Ocean, but have declined precipitously compared to the size of runs prior to the 1700s. The largest (though small by historic ...

  14. Effects of parasites from salmon farms on productivity of wild salmon

    PubMed Central

    Krkošek, Martin; Connors, Brendan M.; Morton, Alexandra; Lewis, Mark A.; Dill, Lawrence M.; Hilborn, Ray

    2011-01-01

    The ecological risks of salmon aquaculture have motivated changes to management and policy designed to protect wild salmon populations and habitats in several countries. In Canada, much attention has focused on outbreaks of parasitic copepods, sea lice (Lepeophtheirus salmonis), on farmed and wild salmon in the Broughton Archipelago, British Columbia. Several recent studies have reached contradictory conclusions on whether the spread of lice from salmon farms affects the productivity of sympatric wild salmon populations. We analyzed recently available sea lice data on farms and spawner–recruit data for pink (Oncorhynchus gorbuscha) and coho (Oncorhynchus kisutch) salmon populations in the Broughton Archipelago and nearby regions where farms are not present. Our results show that sea lice abundance on farms is negatively associated with productivity of both pink and coho salmon in the Broughton Archipelago. These results reconcile the contradictory findings of previous studies and suggest that management and policy measures designed to protect wild salmon from sea lice should yield conservation and fishery benefits. PMID:21873246

  15. Modeling Parasite Dynamics on Farmed Salmon for Precautionary Conservation Management of Wild Salmon

    PubMed Central

    Rogers, Luke A.; Peacock, Stephanie J.; McKenzie, Peter; DeDominicis, Sharon; Jones, Simon R. M.; Chandler, Peter; Foreman, Michael G. G.; Revie, Crawford W.; Krkošek, Martin

    2013-01-01

    Conservation management of wild fish may include fish health management in sympatric populations of domesticated fish in aquaculture. We developed a mathematical model for the population dynamics of parasitic sea lice (Lepeophtheirus salmonis) on domesticated populations of Atlantic salmon (Salmo salar) in the Broughton Archipelago region of British Columbia. The model was fit to a seven-year dataset of monthly sea louse counts on farms in the area to estimate population growth rates in relation to abiotic factors (temperature and salinity), local host density (measured as cohort surface area), and the use of a parasiticide, emamectin benzoate, on farms. We then used the model to evaluate management scenarios in relation to policy guidelines that seek to keep motile louse abundance below an average three per farmed salmon during the March–June juvenile wild Pacific salmon (Oncorhynchus spp.) migration. Abiotic factors mediated the duration of effectiveness of parasiticide treatments, and results suggest treatment of farmed salmon conducted in January or early February minimized average louse abundance per farmed salmon during the juvenile wild salmon migration. Adapting the management of parasites on farmed salmon according to migrations of wild salmon may therefore provide a precautionary approach to conserving wild salmon populations in salmon farming regions. PMID:23577082

  16. Cessation of a salmon decline with control of parasites.

    PubMed

    Peacock, Stephanie J; Krkosek, Martin; Proboszcz, Stan; Orr, Craig; Lewis, Mark A

    2013-04-01

    The resilience of coastal social-ecological systems may depend on adaptive responses to aquaculture disease outbreaks that can threaten wild and farm fish. A nine-year study of parasitic sea lice (Lepeophtheirus salmonis) and pink salmon (Oncorhynchus gorbuscha) from Pacific Canada indicates that adaptive changes in parasite management on salmon farms have yielded positive conservation outcomes. After four years of sea lice epizootics and wild salmon population decline, parasiticide application on salmon farms was adapted to the timing of wild salmon migrations. Winter treatment of farm fish with parasiticides, prior to the out-migration of wild juvenile salmon, has reduced epizootics of wild salmon without significantly increasing the annual number of treatments. Levels of parasites on wild juvenile salmon significantly influence the growth rate of affected salmon populations, suggesting that these changes in management have had positive outcomes for wild salmon populations. These adaptive changes have not occurred through formal adaptive management, but rather, through multi-stakeholder processes arising from a contentious scientific and public debate. Despite the apparent success of parasite control on salmon farms in the study region, there remain concerns about the long-term sustainability of this approach because of the unknown ecological effects of parasticides and the potential for parasite resistance to chemical treatments.

  17. Molecular characterization and histochemical demonstration of salmon olfactory marker protein in the olfactory epithelium of lacustrine sockeye salmon (Oncorhynchus nerka).

    PubMed

    Kudo, H; Doi, Y; Ueda, H; Kaeriyama, M

    2009-09-01

    Despite the importance of olfactory receptor neurons (ORNs) for homing migration, the expression of olfactory marker protein (OMP) is not well understood in ORNs of Pacific salmon (genus Oncorhynchus). In this study, salmon OMP was characterized in the olfactory epithelia of lacustrine sockeye salmon (O. nerka) by molecular biological and histochemical techniques. Two cDNAs encoding salmon OMP were isolated and sequenced. These cDNAs both contained a coding region encoding 173 amino acid residues, and the molecular mass of the two proteins was calculated to be 19,581.17 and 19,387.11Da, respectively. Both amino acid sequences showed marked homology (90%). The protein and nucleotide sequencing demonstrates the existence of high-level homology between salmon OMPs and those of other teleosts. By in situ hybridization using a digoxigenin-labeled salmon OMP cRNA probe, signals for salmon OMP mRNA were observed preferentially in the perinuclear regions of the ORNs. By immunohistochemistry using a specific antibody to salmon OMP, OMP-immunoreactivities were noted in the cytosol of those neurons. The present study is the first to describe cDNA cloning of OMP in salmon olfactory epithelium, and indicate that OMP is a useful molecular marker for the detection of the ORNs in Pacific salmon.

  18. Effect of salmon type and presence/absence of bone on color, sensory characteristics, and consumer acceptability of pureed and chunked infant food products.

    PubMed

    DeSantos, F A; Ramamoorthi, L; Bechtel, P; Smiley, S; Brewer, M S

    2010-08-01

    Salmon-based infant food (puree) and toddler food (puree plus chunks) were manufactured from pink salmon, with and without bone, and from Sockeye salmon, with and without bone, to contain 45% salmon, 55% water, and 5% starch. Products were retort processed at 118 to 121 degrees C for 55 min in a steam-jacketed still retort. A trained descriptive panel (n = 7) evaluated infant and toddler foods separately. Instrumental color, pH, and water activity were also determined. Infant and toddler foods were also evaluated by a consumer panel (n = 104) of parents for product acceptability. During the manufacturing process (cooking, homogenization, retort processing), salmon infant food from pink salmon lost much of its characteristic pink color while that from sockeye salmon retained a greater amount. Bitterness was more evident in samples with bones. In the toddler food formulation containing chunks, the odor and flavor characteristics were influenced primarily by the type of salmon. The presence of bone affected visual pink color and lightness, and salmon odor only. Consumers scored products made with sockeye salmon as more acceptable despite the fact that they had more off-flavor than products from pink salmon. The appearance and thickness of the pureed infant food was more acceptable than the toddler food with chunks despite the chunky toddler product having more acceptable salmon flavor. This indicates that the color and appearance of the prototypes were the main drivers for liking. Of the total number of parents surveyed, 73% would feed this salmon product to their children.

  19. Adaptive strategies and life history characteristics in a warming climate: salmon in the Arctic?

    USGS Publications Warehouse

    Nielsen, Jennifer L.; Ruggerone, Gregory T.; Zimmerman, Christian E.

    2013-01-01

    In the warming Arctic, aquatic habitats are in flux and salmon are exploring their options. Adult Pacific salmon, including sockeye (Oncorhynchus nerka), coho (O. kisutch), Chinook (O. tshawytscha), pink (O. gorbuscha) and chum (O. keta) have been captured throughout the Arctic. Pink and chum salmon are the most common species found in the Arctic today. These species are less dependent on freshwater habitats as juveniles and grow quickly in marine habitats. Putative spawning populations are rare in the North American Arctic and limited to pink salmon in drainages north of Point Hope, Alaska, chum salmon spawning rivers draining to the northwestern Beaufort Sea, and small populations of chum and pink salmon in Canada’s Mackenzie River. Pacific salmon have colonized several large river basins draining to the Kara, Laptev and East Siberian seas in the Russian Arctic. These populations probably developed from hatchery supplementation efforts in the 1960’s. Hundreds of populations of Arctic Atlantic salmon (Salmo salar) are found in Russia, Norway and Finland. Atlantic salmon have extended their range eastward as far as the Kara Sea in central Russian. A small native population of Atlantic salmon is found in Canada’s Ungava Bay. The northern tip of Quebec seems to be an Atlantic salmon migration barrier for other North American stocks. Compatibility between life history requirements and ecological conditions are prerequisite for salmon colonizing Arctic habitats. Broad-scale predictive models of climate change in the Arctic give little information about feedback processes contributing to local conditions, especially in freshwater systems. This paper reviews the recent history of salmon in the Arctic and explores various patterns of climate change that may influence range expansions and future sustainability of salmon in Arctic habitats. A summary of the research needs that will allow informed expectation of further Arctic colonization by salmon is given.

  20. THE SALMON 2100 PROJECT -- AN ALTERNATIVES FUTURES PERSPECTIVE ON PACIFIC NORTHWEST SALMON RECOVERY

    EPA Science Inventory

    The primary goal of the Salmon 2100 Project is to identify practical options that have a high probability of maintaining biologically significant, sustainable populations of wild salmon in the Pacific Northwest and California. Wild salmon recovery efforts in western North Americ...

  1. 50 CFR 660.412 - EFH identifications and descriptions for Pacific salmon.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Pacific salmon. 660.412 Section 660.412 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT... COAST STATES West Coast Salmon Fisheries § 660.412 EFH identifications and descriptions for Pacific salmon. Pacific salmon essential fish habitat (EFH) includes all those water bodies occupied or...

  2. Modeling Interoperable Information Systems with 3LGM² and IHE.

    PubMed

    Stäubert, S; Schaaf, M; Jahn, F; Brandner, R; Winter, A

    2015-01-01

    Strategic planning of information systems (IS) in healthcare requires descriptions of the current and the future IS state. Enterprise architecture planning (EAP) tools like the 3LGM² tool help to build up and to analyze IS models. A model of the planned architecture can be derived from an analysis of current state IS models. Building an interoperable IS, i. e. an IS consisting of interoperable components, can be considered a relevant strategic information management goal for many IS in healthcare. Integrating the healthcare enterprise (IHE) is an initiative which targets interoperability by using established standards. To link IHE concepts to 3LGM² concepts within the 3LGM² tool. To describe how an information manager can be supported in handling the complex IHE world and planning interoperable IS using 3LGM² models. To describe how developers or maintainers of IHE profiles can be supported by the representation of IHE concepts in 3LGM². Conceptualization and concept mapping methods are used to assign IHE concepts such as domains, integration profiles actors and transactions to the concepts of the three-layer graph-based meta-model (3LGM²). IHE concepts were successfully linked to 3LGM² concepts. An IHE-master-model, i. e. an abstract model for IHE concepts, was modeled with the help of 3LGM² tool. Two IHE domains were modeled in detail (ITI, QRPH). We describe two use cases for the representation of IHE concepts and IHE domains as 3LGM² models. Information managers can use the IHE-master-model as reference model for modeling interoperable IS based on IHE profiles during EAP activities. IHE developers are supported in analyzing consistency of IHE concepts with the help of the IHE-master-model and functions of the 3LGM² tool The complex relations between IHE concepts can be modeled by using the EAP method 3LGM². 3LGM² tool offers visualization and analysis features which are now available for the IHE-master-model. Thus information managers and IHE developers can use or develop IHE profiles systematically. In order to improve the usability and handling of the IHE-master-model and its usage as a reference model, some further refinements have to be done. Evaluating the use of the IHE-master-model by information managers and IHE developers is subject to further research.

  3. Effect of length and location of edentulous area on the accuracy of prosthetic treatment plan incorporation into cone-beam computed tomography scans.

    PubMed

    Jamjoom, Faris Z; Kim, Do-Gyoon; Lee, Damian J; McGlumphy, Edwin A; Yilmaz, Burak

    2018-02-05

    Effects of length and location of the edentulous area on the accuracy of prosthetic treatment plan incorporation into cone-beam computed tomography (CBCT) scans has not been investigated. To evaluate the effect of length and location of the edentulous area on the accuracy of prosthetic treatment plan incorporation into CBCT scans using different methods. Direct digital scans of a completely dentate master model with removable radiopaque teeth were made using an intraoral scanner, and digital scans of stone duplicates of the master model were made using a laboratory scanner. Specific teeth were removed to simulate different clinical situations and their CBCT scans were made. Surface scans were registered onto the CBCT scans. Radiographic templates for each clinical situation were also fabricated and used during CBCT scans of the master models. Using metrology software, three-dimensional (3D) deviation was measured on standard tesselation language (STL) files created from the CBCT scans against an STL file of the master model created from a CBCT scan. Statistical analysis was done using the MIXED procedure in a statistical software and Tukey HSD test (α =.05). The interaction between location and method was significant (P = .009). Location had no significant effect on registration methods (P > .05), but on the radiographic templates (P = .011). Length of the edentulous area did not have any significant effect (P > .05). Accuracy of digital image registration methods was similar and higher than that of radiographic templates in all clinical situations. Tooth-bound radiographic templates were significantly more accurate than the free-end templates. The results of this study suggest using image registration instead of radiographic templates when planning dental implants, particularly in free-end situations. © 2018 Wiley Periodicals, Inc.

  4. Salmonid Gamete Preservation in the Snake River Basin : 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armstrong, Robyn; Kucera, Paul A.

    2001-06-01

    Steelhead (Oncorhynchus mykiss) and chinook salmon (Oncorhynchus tshawytscha) populations in the Northwest are decreasing. Genetic diversity is being lost at an alarming rate. The Nez Perce Tribe (Tribe) strives to ensure availability of genetic samples of the existing male salmonid population by establishing and maintaining a germplasm repository. The sampling strategy, initiated in 1992, has been to collect and preserve male salmon and steelhead genetic diversity across the geographic landscape by sampling within the major river subbasins in the Snake River basin, assuming a metapopulation structure existed historically. Gamete cryopreservation conserves genetic diversity in a germplasm repository, but is notmore » a recovery action for listed fish species. The Tribe was funded in 2000 by the Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service Lower Snake River Compensation Plan (LSRCP) to coordinate gene banking of male gametes from Endangered Species Act listed steelhead and spring and summer chinook salmon in the Snake River basin. In 2000, a total of 349 viable chinook salmon semen samples from the Lostine River, Catherine Creek, upper Grande Ronde River, Lookingglass Hatchery (Imnaha River stock), Rapid River Hatchery, Lake Creek, the South Fork Salmon River weir, Johnson Creek, Big Creek, Capehorn Creek, Marsh Creek, Pahsimeroi Hatchery, and Sawtooth Hatchery (upper Salmon River stock) were cryopreserved. Also, 283 samples of male steelhead gametes from Dworshak Hatchery, Fish Creek, Grande Ronde River, Imnaha River, Little Sheep Creek, Pahsimeroi Hatchery and Oxbow Hatchery were also cryopreserved. The Tribe acquired 5 frozen steelhead samples from the Selway River collected in 1994 and 15 from Fish Creek sampled in 1993 from the U.S. Geological Survey, for addition into the germplasm repository. Also, 590 cryopreserved samples from the Grande Ronde chinook salmon captive broodstock program are being stored at the University of Idaho as a long-term archive, half of the total samples. A total of 2,420 cryopreserved samples from Snake River basin steelhead and spring and summer chinook salmon, from 1992 through 2000, are stored in two independent locations at the University of Idaho and Washington State University. Two large freezer tanks are located at each university, each of which holds approximately 25% of the cryopreserved sperm. One tank at each university is considered long-term archival storage, while the other is short-term. Fertility trials were conducted at each university to test the viability of the cryopreserved chinook salmon sperm. The experiments on the 2000 frozen and thawed sperm at both universities found a fertility rate of 60-70%. This document also summarizes 1999-2000 steelhead genetic analysis report. The results of mitochondrial, nuclear DNA and microsatellite analysis found differences and shared haplotypes between the stocks of fish sampled for cryopreservation. Recommendations for future gene banking efforts include the need for establishment of a regional genome resource bank, a greater emphasis on cryopreserving wild fish, continued fertility trials, exploring field cryopreservation and genetic analysis on all fish represented in the germplasm repository.« less

  5. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  6. 50 CFR 226.210 - Central California Coast Coho Salmon (Oncorhynchus kisutch), Southern Oregon/Northern California...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Central California Coast Coho Salmon (Oncorhynchus kisutch), Southern Oregon/Northern California Coasts Coho Salmon (Oncorhynchus kisutch). 226.210... Coast Coho Salmon (Oncorhynchus kisutch), Southern Oregon/Northern California Coasts Coho Salmon...

  7. 50 CFR 226.210 - Central California Coast Coho Salmon (Oncorhynchus kisutch), Southern Oregon/Northern California...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 9 2011-10-01 2011-10-01 false Central California Coast Coho Salmon (Oncorhynchus kisutch), Southern Oregon/Northern California Coasts Coho Salmon (Oncorhynchus kisutch). 226.210... Coast Coho Salmon (Oncorhynchus kisutch), Southern Oregon/Northern California Coasts Coho Salmon...

  8. Sockeye salmon evolution, ecology, and management

    USGS Publications Warehouse

    Woody, Carol Ann

    2007-01-01

    This collection of articles and photographs gives managers a good idea of recent research into what the sockeye salmon is and does, covering such topics as the vulnerability and value of sockeye salmon ecotypes, their homing ability, using new technologies to monitor reproduction, DNA and a founder event in the Lake Clark sockeye salmon, marine-derived nutrients, the exploitation of large prey, dynamic lake spawning migrations by females, variability of sockeye salmon residence, expression profiling using cDNA microarray technology, learning from stable isotropic records of native otolith hatcheries, the amount of data needed to manage sockeye salmon and estimating salmon "escapement." 

  9. Titre distribution patterns of infectious haematopoietic necrosis virus in ovarian fluids of hatchery and feral salmon populations

    USGS Publications Warehouse

    Mulcahy, D.; Pascho, R.J.; Jenes, C.K.

    1983-01-01

    Infectious haematopoietic mecrosis virus (IHNV) is enzootic in virtually all populations of sockeye salmon, Oncorhynchus nerka (Walbaum), and in populations of chinook salmon, O. tshawytscha (Walbaum), of the Sacramento River drainage in California. This disease is an obstacle in hatcheries using brood stocks from these populations. However, naturally spawning sockeye salmon are highly successful and are the most important commercially fished salmon species in the United States. Most of the commercial landings of sockeye salmon are of feral fish originating in Alaska. The success of natural populations of salmon in which IHNV is enzootic, and the recurrent outbreaks of the disease in hatchery fish, led us to compare IHNW prevalence rates in hatchery and feral salmon populations.

  10. Transcription expression of immune-related genes from Caligus rogercresseyi evidences host-dependent patterns on Atlantic and coho salmon.

    PubMed

    Vera-Bizama, Fredy; Valenzuela-Muñoz, Valentina; Gonçalves, Ana Teresa; Marambio, Jorge Pino; Hawes, Christopher; Wadsworth, Simon; Gallardo-Escárate, Cristian

    2015-12-01

    The transcriptomic response of the sea louse Caligus rogercresseyi during the infestation on Atlantic salmon (Salmo salar) and coho salmon (Oncorhynchus kisutch) was evaluated using 27 genes related to immune response, antioxidant system and secretome. Results showed early responses of TLR/IMD signaling pathway in sea lice infesting Atlantic salmon. Overall, genes associated with oxidative stress responses were upregulated in both host species. This pattern suggests that reactive oxygen species emitted by the host as a response to the infestation, could modulate the sea louse antioxidant system. Secretome-related transcripts evidenced upregulation of trypsins and serpins, mainly associated to Atlantic salmon than coho salmon. Interestingly, cathepsins and trypsin2 were downregulated at 7 days post-infection (dpi) in coho salmon. The principal component analysis revealed an inverse time-dependent pattern based on the different responses of C. rogercresseyi infecting both salmon species. Here, Atlantic salmon strongly modulates the transcriptome responses at earlier infection stages; meanwhile coho salmon reveals a less marked modulation, increasing the transcription activity during the infection process. This study evidences transcriptome differences between two salmon host species and provides pivotal knowledge towards elaborating future control strategies. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Relationship of farm salmon, sea lice, and wild salmon populations.

    PubMed

    Marty, Gary D; Saksida, Sonja M; Quinn, Terrance J

    2010-12-28

    Increased farm salmon production has heightened concerns about the association between disease on farm and wild fish. The controversy is particularly evident in the Broughton Archipelago of Western Canada, where a high prevalence of sea lice (ectoparasitic copepods) was first reported on juvenile wild pink salmon (Oncorhynchus gorbuscha) in 2001. Exposure to sea lice from farmed Atlantic salmon (Salmo salar) was thought to be the cause of the 97% population decline before these fish returned to spawn in 2002, although no diagnostic investigation was done to rule out other causes of mortality. To address the concern that sea lice from fish farms would cause population extinction of wild salmon, we analyzed 10-20 y of fish farm data and 60 y of pink salmon data. We show that the number of pink salmon returning to spawn in the fall predicts the number of female sea lice on farm fish the next spring, which, in turn, accounts for 98% of the annual variability in the prevalence of sea lice on outmigrating wild juvenile salmon. However, productivity of wild salmon is not negatively associated with either farm lice numbers or farm fish production, and all published field and laboratory data support the conclusion that something other than sea lice caused the population decline in 2002. We conclude that separating farm salmon from wild salmon--proposed through coordinated fallowing or closed containment--will not increase wild salmon productivity and that medical analysis can improve our understanding of complex issues related to aquaculture sustainability.

  12. Diet, feeding patterns, and prey selection of subyearling Atlantic salmon (Salmo salar) and subyearling chinook salmon (Oncorhynchus tshawytscha) in a tributary of Lake Ontario

    USGS Publications Warehouse

    Johnson, J. H.; Nash, K. J.; Chiavelli, R. A.; DiRado, J. A.; Mackey, G. E.; Knight, J. R.; Diaz, A. R.

    2017-01-01

    Since juvenile Atlantic salmon (Salmo salar) and Chinook salmon (Oncorhynchus tshawytscha) occupy a similar habitat in Lake Ontario tributaries, we sought to determine the degree of diet similarity between these species in order to assess the potential for interspecific competition. Atlantic salmon, an historically important but currently extirpated component of the Lake Ontario fish community, are the focus of a bi-national restoration effort. Presently this effort includes the release of hatchery produced juvenile Atlantic salmon in Lake Ontario tributaries. These same tributaries support substantial numbers of naturally reproduced juvenile Pacific salmonids including Chinook salmon. Subyearling Atlantic salmon and subyearling Chinook salmon had significantly different diets during each of the three time periods examined. Atlantic salmon fed slightly more from the benthos than from the drift and consumed mainly chirononmids (47.0%) and ephemeropterans (21.1%). The diet of subyearling Chinook salmon was more closely associated with the drift and consisted mainly of chironomids (60.2%) and terrestrial invertebrates (16.0%). Low diet similarity between subyearling Atlantic salmon and subyearling Chinook salmon likely minimizes competitive interactions for food between these species in Lake Ontario tributaries. However, the availability of small prey such as chironomids which comprise over 50% of the diet of each species, soon after emergence, could constitute a short term resource limitation. To our knowledge this is the first study of interspecific diet associations between these two important salmonid species.

  13. Use of Dual Frequency Identification Sonar to Determine Adult Chinook Salmon (Oncorhynchus tshawytscha) Escapement in the Secesh River, Idaho ; Annual Report, January 2008 – December 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kucera, Paul A.

    2009-06-26

    Chinook salmon in the Snake River basin were listed as threatened under the Endangered Species Act in 1992 (NMFS 1992). The Secesh River represents the only stream in the Snake River basin where natural origin (wild) salmon escapement monitoring occurs at the population level, absent a supplementation program. As such the Secesh River has been identified as a long term salmon escapement and productivity monitoring site by the Nez Perce Tribe Department of Fisheries Resources Management. Salmon managers will use this data for effective population management and evaluation of the effect of conservation actions on a natural origin salmon population.more » The Secesh River also acts as a reference stream for supplementation program comparison. Dual frequency identification sonar (DIDSON) was used to determine adult spring and summer Chinook salmon escapement in the Secesh River in 2008. DIDSON technology was selected because it provided a non-invasive method for escapement monitoring that avoided listed species trapping and handling incidental mortality, and fish impedance related concerns. The DIDSON monitoring site was operated continuously from June 13 to September 14. The first salmon passage was observed on July 3. DIDSON site total estimated salmon escapement, natural and hatchery fish, was 888 fish {+-} 65 fish (95% confidence interval). Coefficient of variation associated with the escapement estimate was 3.7%. The DIDSON unit was operational 98.1% of the salmon migration period. Adult salmon migration timing in the Secesh River occurred over 74 days from July 3 to September 14, with 5,262 total fish passages observed. The spawning migration had 10%, median, and 90% passage dates of July 8, July 16, and August 12, respectively. The maximum number of net upstream migrating salmon was above the DIDSON monitoring site on August 27. Validation monitoring of DIDSON target counts with underwater optical cameras occurred for species identification. A total of 860 optical camera identified salmon passage observations were identical to DIDSON target counts. However, optical cameras identified eight jack salmon (3 upstream, 5 downstream) less than 55 cm in length that DIDSON did not count as salmon because of the length criteria employed ({ge} 55 cm). Precision of the DIDSON technology was evaluated by comparing estimated net upstream salmon escapement and associated 95% confidence intervals between two DIDSON sonar units operated over a five day period. The DIDSON 1 salmon escapement was 145.7 fish ({+-} 2.3), and the DIDSON 2 escapement estimate was 150.5 fish ({+-} 5). The overlap in the 95% confidence intervals suggested that the two escapement estimates were not significantly different from each other. Known length salmon carcass trials were conducted in 2008 to examine the accuracy of manually measured lengths, obtained using DIDSON software, on high frequency files at a 5 m window length. Linear regression demonstrated a highly significant relationship between known lengths and manually measured salmon carcass lengths (p < 0.0001). A positive bias in manual length measurement of 6.8% to 8% existed among the two observers in the analysis. Total Secesh River salmon escapement (natural origin and hatchery) in 2008 was 912 fish. Natural origin salmon escapement in the entire Secesh River drainage was 847 fish. The estimated natural origin spawner abundance was 836 fish. Salmon spawner abundance in 2008 increased by three fold compared to 2007 abundance levels. The 10 year geometric mean natural origin spawner abundance was 538 salmon and was below the recommended viable population threshold level established by the ICTRT (2007). One additional Snake River basin salmon population was assessed for comparison of natural origin salmon spawner abundance. The Johnson Creek/EFSF Salmon River population had a 10 year geometric mean natural origin spawner abundance of 254 salmon. Salmon spawner abundance levels in both streams were below viable population thresholds. DIDSON technology has been used in the Secesh River to determine salmon escapement over the past five years. The results suggest that DIDSON technology is reliable and can be used to generate accurate and precise estimates of salmon escapement if appropriate methods are used.« less

  14. Integral stormwater management master plan and design in an ecological community.

    PubMed

    Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man

    2014-09-01

    Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.

  15. Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.

    1995-09-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less

  16. Enhanced transcriptomic responses in the Pacific salmon louse Lepeophtheirus salmonis oncorhynchi to the non-native Atlantic Salmon Salmo salar suggests increased parasite fitness.

    PubMed

    Braden, Laura M; Sutherland, Ben J G; Koop, Ben F; Jones, Simon R M

    2017-01-30

    Outcomes of infections with the salmon louse Lepeophtheirus salmonis vary considerably among its natural hosts (Salmo, Oncorhynchus spp.). Host-parasite interactions range from weak to strong host responses accompanied by high to low parasite abundances, respectively. Parasite behavioral studies indicate that the louse prefers the host Atlantic Salmon (Salmo salar), which is characterized by a weak immune response, and that this results in enhanced parasite reproduction and growth rates. Furthermore, parasite-derived immunosuppressive molecules (e.g., proteases) have been detected at higher amounts in response to the mucus of Atlantic Salmon relative to Coho Salmon (Oncorhynchus kisutch). However, the host-specific responses of the salmon louse have not been well characterized in either of the genetically distinct sub-species that occur in the Atlantic and Pacific Oceans. We assessed and compared the transcriptomic feeding response of the Pacific salmon louse (L. salmonis oncorhynchi,) while parasitizing the highly susceptible Atlantic Salmon and Sockeye Salmon (Oncorhynchus nerka) or the more resistant Coho Salmon (Oncorhynchus kisutch) using a 38 K oligonucleotide microarray. The response of the louse was enhanced both in the number of overexpressed genes and in the magnitude of expression while feeding on the non-native Atlantic Salmon, compared to either Coho or Sockeye Salmon. For example, putative virulence factors (e.g., cathepsin L, trypsin, carboxypeptidase B), metabolic enzymes (e.g., cytochrome B, cytochrome C), protein synthesis enzymes (e.g., ribosomal protein P2, 60S ribosomal protein L7), and reproduction-related genes (e.g., estrogen sulfotransferase) were overexpressed in Atlantic-fed lice, indicating heightened parasite fitness with this host species. In contrast, responses in Coho- or Sockeye-fed lice were more similar to those of parasites deprived of a host. To test for host acclimation by the parasite, we performed a reciprocal host transfer experiment and determined that the exaggerated response to Atlantic Salmon was independent of the initial host species, confirming our conclusion that the Pacific salmon louse exhibits an enhanced response to Atlantic Salmon. This study characterized global transcriptomic responses of Pacific salmon lice during infection of susceptible and resistant hosts. Similar parasite responses during infection of Coho or Sockeye Salmon, despite differences in natural immunity to infection between these host species, indicate that host susceptibility status alone does not drive the parasite response. We identified an enhanced louse response after feeding on Atlantic Salmon, characterized by up-regulation of virulence factors, energy metabolism and reproductive-associated transcripts. In contrast, the responses of lice infecting Coho or Sockeye Salmon were weaker, with reduced expression of virulence factors. These observations indicate that the response of the louse is independent of host susceptibility and suggest that co-evolutionary host-parasite relationships may influence contemporary host-parasite interactions. This research improves our understanding of the susceptibility of Atlantic Salmon and may assist in the development of novel control measures against the salmon louse.

  17. Differential use of salmon by vertebrate consumers: implications for conservation

    PubMed Central

    Wheat, Rachel E.; Allen, Jennifer M.; Wilmers, Christopher C.

    2015-01-01

    Salmon and other anadromous fish are consumed by vertebrates with distinct life history strategies to capitalize on this ephemeral pulse of resource availability. Depending on the timing of salmon arrival, this resource may be in surplus to the needs of vertebrate consumers if, for instance, their populations are limited by food availability during other times of year. However, the life history of some consumers enables more efficient exploitation of these ephemeral resources. Bears can deposit fat and then hibernate to avoid winter food scarcity, and highly mobile consumers such as eagles, gulls, and other birds can migrate to access asynchronous pulses of salmon availability. We used camera traps on pink, chum, and sockeye salmon spawning grounds with various run times and stream morphologies, and on individual salmon carcasses, to discern potentially different use patterns among consumers. Wildlife use of salmon was highly heterogeneous. Ravens were the only avian consumer that fed heavily on pink salmon in small streams. Eagles and gulls did not feed on early pink salmon runs in streams, and only moderately at early sockeye runs, but were the dominant consumers at late chum salmon runs, particularly on expansive river flats. Brown bears used all salmon resources far more than other terrestrial vertebrates. Notably, black bears were not observed on salmon spawning grounds despite being the most frequently observed vertebrate on roads and trails. From a conservation and management perspective, all salmon species and stream morphologies are used extensively by bears, but salmon spawning late in the year are disproportionately important to eagles and other highly mobile species that are seasonally limited by winter food availability. PMID:26339539

  18. Sea lice, Lepeophtheirus salmonis, transfer between wild sympatric adult and juvenile salmon on the north coast of British Columbia, Canada.

    PubMed

    Gottesfeld, A S; Proctor, B; Rolston, L D; Carr-Harris, C

    2009-01-01

    We examine sea lice, Lepeophtheirus salmonis, on juvenile and adult salmon from the north coast of British Columbia between 2004 and 2006 in an area that does not at present contain salmon farms. There is a pronounced zonation in the abundance of L. salmonis on juvenile pink salmon, Oncorhynchus gorbuscha, in the Skeena and Nass estuaries. Abundances in the proximal and distal zones of these estuaries are 0.01 and 0.05 respectively. The outer zones serve as feeding and staging areas for the pink salmon smolts. Returning Chinook, Oncorhynchus tshawytscha, and coho salmon, Oncorhynchus kisutch, concentrate in these areas. We collected data in 2006 to examine whether L. salmonis on returning adult salmon are an important source of the sea lice that appear on juvenile pink salmon. Nearly all (99%) of the sea lice on returning Chinook and over 80% on coho salmon were L. salmonis. Most of the L. salmonis were motile stages including many ovigerous females. There was a sharp increase in the abundance of sea lice on juvenile pink salmon smolts between May and July 2006 near the sites of adult captures. As there are no salmon farms on the north coast, few sticklebacks, Gasterosteus aculeatus, and very few resident salmonids until later in the summer, it seems that the most important reservoir of L. salmonis under natural conditions is returning adult salmon. This natural source of sea lice results in levels of abundance that are one or two orders of magnitude lower than those observed on juvenile pink salmon in areas with salmon farms such as the Broughton Archipelago.

  19. Bioavailability of astaxanthin stereoisomers from wild (Oncorhynchus spp.) and aquacultured (Salmo salar) salmon in healthy men: a randomised, double-blind study.

    PubMed

    Rüfer, Corinna E; Moeseneder, Jutta; Briviba, Karlis; Rechkemmer, Gerhard; Bub, Achim

    2008-05-01

    The objective of the present study was to investigate the bioavailability and the configurational isomer distribution of the carotenoid astaxanthin (AST) in human plasma after ingestion of wild (Oncorhynchus spp.) and aquacultured (Salmo salar) salmon. In a randomised and double-blind trial, twenty-eight healthy men consumed 250 g wild or aquacultured salmon daily for 4 weeks which provided 5 mug AST/g salmon flesh. The plasma AST concentrations as well as the isomer distribution were measured by HPLC using a reversed and a chiral stationary phase. After 6 d of intervention with salmon, plasma AST concentrations reached a plateau of 39 nmol/l after consumption of wild salmon and of 52 nmol/l after administration of aquacultured salmon. At days 3, 6, 10 and 14 -- but not at day 28 -- the AST concentrations in human plasma were significantly greater after ingestion of aquacultured salmon. After administration of wild salmon, the (3S,3'S) isomer predominated in plasma (80 %), whereas after intake of aquacultured salmon the meso form (3R,3'S) prevailed (48 %). Therefore, the AST isomer pattern in human plasma resembles that of the ingested salmon. However, after consumption of both wild and aquacultured salmon for 28 d the relative proportion of the (3S,3'S) isomer was slightly higher and the (3R,3'R) form lower in human plasma compared with the isomer distribution in salmon flesh. A selective process of isomer absorption could be responsible for the observed differences in the relative proportions of the (3S,3'S) and (3R,3'R) isomers in human plasma compared with salmon flesh.

  20. Congener Patterns of Persistent Organic Pollutants Establish the Extent of Contaminant Biotransport by Pacific Salmon in the Great Lakes.

    PubMed

    Gerig, Brandon S; Chaloner, Dominic T; Janetski, David J; Rediske, Richard R; O'Keefe, James P; Moerke, Ashley H; Lamberti, Gary A

    2016-01-19

    In the Great Lakes, introduced Pacific salmon (Oncorhynchus spp.) can transport persistent organic pollutants (POPs), such as polychlorinated biphenyls (PCBs) and polybrominated diphenyl ethers (PBDEs), to new environments during their spawning migrations. To explore the nature and extent of POP biotransport by salmon, we compared 58 PCB and 6 PBDE congeners found in spawning salmon directly to those in resident stream fish. We hypothesized that stream fish exposed to salmon spawners would have congener patterns similar to those of salmon, the presumed contaminant source. Using permutational multivariate analysis of variance (PERMANOVA) and nonmetric multidimensional scaling (NMDS), we found that POP congener patterns of Pacific salmon varied among regions in the Great Lakes basin (i.e., Lake Huron, Lake Michigan, or Lake Superior), tissue type (whole fish or eggs), and contaminant type (PCB or PBDE). For stream-resident fish, POP congener pattern was influenced by the presence of salmon, location (i.e., Great Lakes Basin), and species identity (i.e., brook trout [Salvelinus fontinalis] or mottled sculpin [Cottus bairdii]). Similarity in congener patterns indicated that salmon are a source of POPs to brook trout in stream reaches receiving salmon spawners from Lake Michigan and Lake Huron but not from Lake Superior. Congener patterns of mottled sculpin differed from those of brook trout and salmon, suggesting that brook trout and mottled sculpin either use salmon tissue to differing degrees, acquire POPs from different dietary sources, or bioaccumulate or metabolize POPs differently. Overall, our analyses identified the important role of salmon in contaminant biotransport but also demonstrated that the extent of salmon-mediated POP transfer and uptake in Great Lakes tributaries is location- and species-specific.

  1. Does Domestication Cause Changes in Growth Reaction Norms? A Study of Farmed, Wild and Hybrid Atlantic Salmon Families Exposed to Environmental Stress

    PubMed Central

    Solberg, Monica Favnebøe; Skaala, Øystein; Nilsen, Frank; Glover, Kevin Alan

    2013-01-01

    One of the most important traits linked with the successful domestication of animals is reducing their sensitivity to environmental stressors in the human controlled environment. In order to examine whether domestication selection in Atlantic salmon Salmo salar L., over approximately ten generations, has inadvertently selected for reduced responsiveness to stress, we compared the growth reaction norms of 29 wild, hybrid and domesticated families reared together under standard hatchery conditions (control) and in the presence of a stressor (reduced water level twice daily). The experiment was conducted for a 14 week period. Farmed salmon outgrew wild salmon 1∶2.93 in the control tanks, and no overlap in mean weight was displayed between families representing the three groups. Thus, the elevation of the reaction norms differed among the groups. Overall, growth was approximately 25% lower in the stressed tanksl; however, farmed salmon outgrew wild salmon 1∶3.42 under these conditions. That farmed salmon maintained a relatively higher growth rate than the wild salmon in the stressed tanks demonstrates a lower responsiveness to stress in the farmed salmon. Thus, flatter reaction norm slopes were displayed in the farmed salmon, demonstrating reduced plasticity for this trait under these specific experimental conditions. For all growth measurements, hybrid salmon displayed intermediate values. Wild salmon displayed higher heritability estimates for body weight than the hybrid and farmed salmon in both environments. This suggests reduced genetic variation for body weight in the farmed contra wild salmon studied here. While these results may be linked to the specific families and stocks investigated, and verification in other stocks and traits is needed, these data are consistent with the theoretical predictions of domestication. PMID:23382901

  2. San Francisco Municipal Railway 5-Year Plan: 1979-1984

    DOT National Transportation Integrated Search

    1979-02-22

    Presents MUNI's five year "master" plan for the programming of transit operations. It describes the existing system and what is anticipated for the future. It covers route design, operations, rolling stock requirements, and evaluates each on the basi...

  3. Rolla West master plan : task 2, I-44 interchange--sub consultant services to HNTB.

    DOT National Transportation Integrated Search

    2008-08-01

    Provide support to HNTB as they complete the following tasks: data collection, alternatives workshop, identification of funding : sources, final plan preparation. A full sub consultant scope of service is attached to this application.

  4. Plasmacytoid leukemia of chinook salmon.

    PubMed

    Kent, M L; Eaton, W D; Casey, J W

    1997-04-01

    Plasmacytoid leukemia is a common disease of seawater pen-reared chinook salmon (Oncorhynchus tshawytscha) in British Columbia, Canada, but has also been detected in wild salmon, in freshwater-reared salmon in United States, and in salmon from netpens in Chile. The disease can be transmitted under laboratory conditions, and is associated with a retrovirus, the salmon leukemia virus. However, the proliferating plasmablasts are often infected with the microsporean Enterocytozoon salmonis, which may be an important co-factor in the disease.

  5. Characterization of full-length sequenced cDNA inserts (FLIcs) from Atlantic salmon (Salmo salar)

    PubMed Central

    Andreassen, Rune; Lunner, Sigbjørn; Høyheim, Bjørn

    2009-01-01

    Background Sequencing of the Atlantic salmon genome is now being planned by an international research consortium. Full-length sequenced inserts from cDNAs (FLIcs) are an important tool for correct annotation and clustering of the genomic sequence in any species. The large amount of highly similar duplicate sequences caused by the relatively recent genome duplication in the salmonid ancestor represents a particular challenge for the genome project. FLIcs will therefore be an extremely useful resource for the Atlantic salmon sequencing project. In addition to be helpful in order to distinguish between duplicate genome regions and in determining correct gene structures, FLIcs are an important resource for functional genomic studies and for investigation of regulatory elements controlling gene expression. In contrast to the large number of ESTs available, including the ESTs from 23 developmental and tissue specific cDNA libraries contributed by the Salmon Genome Project (SGP), the number of sequences where the full-length of the cDNA insert has been determined has been small. Results High quality full-length insert sequences from 560 pre-smolt white muscle tissue specific cDNAs were generated, accession numbers [GenBank: BT043497 - BT044056]. Five hundred and ten (91%) of the transcripts were annotated using Gene Ontology (GO) terms and 440 of the FLIcs are likely to contain a complete coding sequence (cCDS). The sequence information was used to identify putative paralogs, characterize salmon Kozak motifs, polyadenylation signal variation and to identify motifs likely to be involved in the regulation of particular genes. Finally, conserved 7-mers in the 3'UTRs were identified, of which some were identical to miRNA target sequences. Conclusion This paper describes the first Atlantic salmon FLIcs from a tissue and developmental stage specific cDNA library. We have demonstrated that many FLIcs contained a complete coding sequence (cCDS). This suggests that the remaining cDNA libraries generated by SGP represent a valuable cCDS FLIc source. The conservation of 7-mers in 3'UTRs indicates that these motifs are functionally important. Identity between some of these 7-mers and miRNA target sequences suggests that they are miRNA targets in Salmo salar transcripts as well. PMID:19878547

  6. Evidence for a carrier state of infectious hematopoietic necrosis virus in chinook salmon Oncorhynchus tshawytscha.

    PubMed

    St Hilaire, S; Ribble, C; Traxler, G; Davies, T; Kent, M L

    2001-10-08

    In British Columbia, Canada, infectious hematopoietic necrosis virus (IHNV) is prevalent in wild sockeye salmon Oncorhynchus nerka and has caused disease in seawater net-pen reared Atlantic salmon Salmo salar. In this study, chinook salmon Oncorhynchus tshawytscha experimentally exposed to an isolate of IHNV found in British Columbia became carriers of the virus. When Atlantic salmon were cohabited with these virus-exposed chinook salmon, IHNV was isolated from the Atlantic salmon. Identification of chinook salmon populations that have been exposed to IHNV may be difficult, as virus isolation was successful only in fish that were concurrently infected with either Renibacterium salmoninarum or Piscirickettisia salmonis. Also, IHNV-specific antibodies were detected in only 2 of the 70 fish experimentally exposed to the virus. Two samples collected from chinook salmon exposed to IHNV while at a salt water net-pen site had a seroprevalence of 19 and 22%; however, the inconsistencies between our laboratory and field data suggest that further research is required before we can rely on serological analysis for identifying potential carrier populations. Because of the difficulty in determining the exposure status of populations of chinook salmon, especially if there is no concurrent disease, it may be prudent not to cohabit Atlantic salmon with chinook salmon on a farm if there is any possibility that the latter have been exposed to the virus.

  7. Tissue astaxanthin and canthaxanthin distribution in rainbow trout (Oncorhynchus mykiss) and Atlantic salmon (Salmo salar).

    PubMed

    Page, G I; Davies, S J

    2006-01-01

    A comparative investigation of tissue carotenoid distribution between rainbow trout, Oncorhynchus mykiss, and Atlantic salmon, Salmo salar, was undertaken to identify the relative efficiency of utilization of astaxanthin and canthaxanthin. Higher apparent digestibility coefficients (ADCs) (96% in trout vs. 28-31% in salmon; P<0.05), and pigment retention efficiencies (11.5-12.5% in trout vs. 5.5% in salmon; P<0.05), for both astaxanthin and canthaxanthin, were observed for rainbow trout. Astaxanthin deposition was higher than canthaxanthin in rainbow trout, while the reverse was true for Atlantic salmon, suggesting species-specificity in carotenoid utilization. The white muscle (95% in trout vs. 93% in salmon) and kidneys (0.5% in trout vs. 0.2% in salmon) represented higher proportions of the total body carotenoid pool in rainbow trout than in Atlantic salmon (P<0.05), whereas the liver was a more important storage organ in Atlantic salmon (2-6% in salmon vs. 0.2% in trout; P<0.05). The liver and kidney appeared to be important sites of carotenoid catabolism based on the relative proportion of the peak chromatogram of the fed carotenoid in both species, with the pyloric caecae and hind gut being more important in Atlantic salmon than in the rainbow trout. Liver catabolism is suspected to be a critical determinant in carotenoid clearance, with higher catabolism expected in Atlantic salmon than in rainbow trout.

  8. Planning a Master's Level Curriculum According to Career Space Recommendations Using Concept Mapping Techniques

    ERIC Educational Resources Information Center

    Toral Marin, Sergio L.; Martineztorres, Rocio; Barrero Garcia, Federico J.; Vazquez, Sergio Gallardo; Vargas, Enrique; Ayala, Vicente Gonzalez

    2006-01-01

    Nowadays the European Universities are worried about how to adapt higher education to the new European Higher Education Area, as proposed in the Bologna Magna Charta Universitatum of 1998, and signed by 32 European Education Ministers. One of the key points in this higher education reform was the introduction of new Master's level curricula. These…

  9. Distance Training in Function-based Interventions to Decrease Student Problem Behavior: Summary of 74 Cases from a University Course

    ERIC Educational Resources Information Center

    Pétursdóttir, Anna-Lind

    2017-01-01

    In this study, 188 master-level students received training through a distance education course to conduct functional behavioral assessments (FBAs) and behavior support plans with 68 boys and six girls (aged 3-20 years) displaying persistent behavior problems in inclusive preschools, elementary, and secondary schools. In the course, master-level…

  10. Professional Disclosure Statements and Formal Plans for Supervision: Two Strategies for Minimizing the Risk of Ethical Conflicts in Post-Master's Supervision.

    ERIC Educational Resources Information Center

    Cobia, Debra C.; Boes, Susan R.

    2000-01-01

    Discusses ethical conflicts related to issues of informed consent, due process, competence, confidentiality, and dual relationships in supervision. Proposes two strategies as ways to minimize the potential for ethical conflict in post-master's supervision: the use of professional disclosure statements by supervisors and the development of formal…

  11. Test Excavation and Evaluation of 45-FR-317, on the Middle Columbia River, Near Pasco, Washington.

    DTIC Science & Technology

    1984-01-01

    present in the area, the most important of which, for humans, were chinook salmon ( Oncorhynchus tshawtscha), coho salmon (0. kisutch), and steelhead...trout (Salmo gairderi); sockeye salmon (0. nerka ), chum salmon (0. keta), and pink salmon (0. gorbuscha) were more limited and of lesser importance

  12. 77 FR 12800 - Fresh and Chilled Atlantic Salmon From Norway: Revocation of Antidumping and Countervailing Duty...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Atlantic Salmon From Norway: Revocation of Antidumping and Countervailing Duty Orders AGENCY: Import...'') and countervailing duty (``CVD'') orders on fresh and chilled Atlantic salmon (``salmon'') from Norway... orders on salmon from Norway, pursuant to sections 751(c) and 752 of the Tariff Act of 1930, as amended...

  13. Stable isotopes of C and S as indicators of habitat use by fish in small oregon Coast range streams

    EPA Science Inventory

    We are using stable isotopes of C, N, O and S (H planned) to study the ecology of coho salmon in streams of the Oregon Coast Range. We have found isotopes of C and, surprisingly, S to be very useful in discriminating rearing habitats in our small streams. We found 13C values ...

  14. Poached Salmon

    MedlinePlus

    ... page: https://medlineplus.gov/recipe/poachedsalmon.html Poached Salmon To use the sharing features on this page, ... olive oil Ground black pepper, to taste For salmon: 4 salmon steaks, 5 oz each 3 cups ...

  15. Early human use of anadromous salmon in North America at 11,500 y ago.

    PubMed

    Halffman, Carrin M; Potter, Ben A; McKinney, Holly J; Finney, Bruce P; Rodrigues, Antonia T; Yang, Dongya Y; Kemp, Brian M

    2015-10-06

    Salmon represented a critical resource for prehistoric foragers along the North Pacific Rim, and continue to be economically and culturally important; however, the origins of salmon exploitation remain unresolved. Here we report 11,500-y-old salmon associated with a cooking hearth and human burials from the Upward Sun River Site, near the modern extreme edge of salmon habitat in central Alaska. This represents the earliest known human use of salmon in North America. Ancient DNA analyses establish the species as Oncorhynchus keta (chum salmon), and stable isotope analyses indicate anadromy, suggesting that salmon runs were established by at least the terminal Pleistocene. The early use of this resource has important implications for Paleoindian land use, economy, and expansions into northwest North America.

  16. Early human use of anadromous salmon in North America at 11,500 y ago

    PubMed Central

    Halffman, Carrin M.; Potter, Ben A.; McKinney, Holly J.; Finney, Bruce P.; Rodrigues, Antonia T.; Yang, Dongya Y.; Kemp, Brian M.

    2015-01-01

    Salmon represented a critical resource for prehistoric foragers along the North Pacific Rim, and continue to be economically and culturally important; however, the origins of salmon exploitation remain unresolved. Here we report 11,500-y-old salmon associated with a cooking hearth and human burials from the Upward Sun River Site, near the modern extreme edge of salmon habitat in central Alaska. This represents the earliest known human use of salmon in North America. Ancient DNA analyses establish the species as Oncorhynchus keta (chum salmon), and stable isotope analyses indicate anadromy, suggesting that salmon runs were established by at least the terminal Pleistocene. The early use of this resource has important implications for Paleoindian land use, economy, and expansions into northwest North America. PMID:26392548

  17. Are inland wolf-ungulate systems influenced by marine subsidies of Pacific salmon?

    USGS Publications Warehouse

    Adams, Layne G.; Farley, Sean D.; Stricker, Craig A.; Demma, Dominic J.; Roffler, Gretchen H.; Miller, Dennis C.; Rye, Robert O.

    2010-01-01

    Wolves (Canis lupus) in North America are considered obligate predators of ungulates with other food resources playing little role in wolf population dynamics or wolf–prey relations. However, spawning Pacific salmon (Oncorhyncus spp.) are common throughout wolf range in northwestern North America and may provide a marine subsidy affecting inland wolf–ungulate food webs far from the coast. We conducted stable‐isotope analyses for nitrogen and carbon to evaluate the contribution of salmon to diets of wolves in Denali National Park and Preserve, 1200 river‐km from tidewater in interior Alaska, USA. We analyzed bone collagen from 73 wolves equipped with radio collars during 1986–2002 and evaluated estimates of salmon in their diets relative to the availability of salmon and ungulates within their home ranges. We compared wolf densities and ungulate : wolf ratios among regions with differing salmon and ungulate availability to assess subsidizing effects of salmon on these wolf–ungulate systems. Wolves in the northwestern flats of the study area had access to spawning salmon but low ungulate availability and consumed more salmon (17% ± 7% [mean ± SD]) than in upland regions, where ungulates were sixfold more abundant and wolves did or did not have salmon spawning areas within their home ranges (8% ± 6% and 3% ± 3%, respectively). Wolves were only 17% less abundant on the northwestern flats compared to the remainder of the study area, even though ungulate densities were 78% lower. We estimated that biomass from fall runs of chum (O. keta) and coho (O. kisutch) salmon on the northwestern flats was comparable to the ungulate biomass there, and the contribution of salmon to wolf diets was similar to estimates reported for coastal wolves in southeast Alaska. Given the ubiquitous consumption of salmon by wolves on the northwestern flats and the abundance of salmon there, we conclude that wolf numbers in this region were enhanced by the allochthonous subsidy provided by salmon and discuss implications for wolf–ungulate relations.

  18. Sea louse infection of juvenile sockeye salmon in relation to marine salmon farms on Canada's west coast.

    PubMed

    Price, Michael H H; Proboszcz, Stan L; Routledge, Rick D; Gottesfeld, Allen S; Orr, Craig; Reynolds, John D

    2011-02-09

    Pathogens are growing threats to wildlife. The rapid growth of marine salmon farms over the past two decades has increased host abundance for pathogenic sea lice in coastal waters, and wild juvenile salmon swimming past farms are frequently infected with lice. Here we report the first investigation of the potential role of salmon farms in transmitting sea lice to juvenile sockeye salmon (Oncorhynchus nerka). We used genetic analyses to determine the origin of sockeye from Canada's two most important salmon rivers, the Fraser and Skeena; Fraser sockeye migrate through a region with salmon farms, and Skeena sockeye do not. We compared lice levels between Fraser and Skeena juvenile sockeye, and within the salmon farm region we compared lice levels on wild fish either before or after migration past farms. We matched the latter data on wild juveniles with sea lice data concurrently gathered on farms. Fraser River sockeye migrating through a region with salmon farms hosted an order of magnitude more sea lice than Skeena River populations, where there are no farms. Lice abundances on juvenile sockeye in the salmon farm region were substantially higher downstream of farms than upstream of farms for the two common species of lice: Caligus clemensi and Lepeophtheirus salmonis, and changes in their proportions between two years matched changes on the fish farms. Mixed-effects models show that position relative to salmon farms best explained C. clemensi abundance on sockeye, while migration year combined with position relative to salmon farms and temperature was one of two top models to explain L. salmonis abundance. This is the first study to demonstrate a potential role of salmon farms in sea lice transmission to juvenile sockeye salmon during their critical early marine migration. Moreover, it demonstrates a major migration corridor past farms for sockeye that originated in the Fraser River, a complex of populations that are the subject of conservation concern.

  19. A Modeled Comparison of Direct and Food Web-Mediated Impacts of Common Pesticides on Pacific Salmon

    PubMed Central

    Macneale, Kate H.; Spromberg, Julann A.; Baldwin, David H.; Scholz, Nathaniel L.

    2014-01-01

    In the western United States, pesticides used in agricultural and urban areas are often detected in streams and rivers that support threatened and endangered Pacific salmon. Although concentrations are rarely high enough to cause direct salmon mortality, they can reach levels sufficient to impair juvenile feeding behavior and limit macroinvertebrate prey abundance. This raises the possibility of direct adverse effects on juvenile salmon health in tandem with indirect effects on salmon growth as a consequence of reduced prey abundance. We modeled the growth of ocean-type Chinook salmon (Oncorhynchus tshawytscha) at the individual and population scales, investigating insecticides that differ in how long they impair salmon feeding behavior and in how toxic they are to salmon compared to macroinvertebrates. The relative importance of these direct vs. indirect effects depends both on how quickly salmon can recover and on the relative toxicity of an insecticide to salmon and their prey. Model simulations indicate that when exposed to a long-acting organophosphate insecticide that is highly toxic to salmon and invertebrates (e.g., chlorpyrifos), the long-lasting effect on salmon feeding behavior drives the reduction in salmon population growth with reductions in prey abundance having little additional impact. When exposed to short-acting carbamate insecticides at concentrations that salmon recover from quickly but are lethal to invertebrates (e.g., carbaryl), the impacts on salmon populations are due primarily to reductions in their prey. For pesticides like carbaryl, prey sensitivity and how quickly the prey community can recover are particularly important in determining the magnitude of impact on their predators. In considering both indirect and direct effects, we develop a better understanding of potential impacts of a chemical stressor on an endangered species and identify data gaps (e.g., prey recovery rates) that contribute uncertainty to these assessments. PMID:24686837

  20. Sea Louse Infection of Juvenile Sockeye Salmon in Relation to Marine Salmon Farms on Canada's West Coast

    PubMed Central

    Price, Michael H. H.; Proboszcz, Stan L.; Routledge, Rick D.; Gottesfeld, Allen S.; Orr, Craig; Reynolds, John D.

    2011-01-01

    Background Pathogens are growing threats to wildlife. The rapid growth of marine salmon farms over the past two decades has increased host abundance for pathogenic sea lice in coastal waters, and wild juvenile salmon swimming past farms are frequently infected with lice. Here we report the first investigation of the potential role of salmon farms in transmitting sea lice to juvenile sockeye salmon (Oncorhynchus nerka). Methodology/Principal Findings We used genetic analyses to determine the origin of sockeye from Canada's two most important salmon rivers, the Fraser and Skeena; Fraser sockeye migrate through a region with salmon farms, and Skeena sockeye do not. We compared lice levels between Fraser and Skeena juvenile sockeye, and within the salmon farm region we compared lice levels on wild fish either before or after migration past farms. We matched the latter data on wild juveniles with sea lice data concurrently gathered on farms. Fraser River sockeye migrating through a region with salmon farms hosted an order of magnitude more sea lice than Skeena River populations, where there are no farms. Lice abundances on juvenile sockeye in the salmon farm region were substantially higher downstream of farms than upstream of farms for the two common species of lice: Caligus clemensi and Lepeophtheirus salmonis, and changes in their proportions between two years matched changes on the fish farms. Mixed-effects models show that position relative to salmon farms best explained C. clemensi abundance on sockeye, while migration year combined with position relative to salmon farms and temperature was one of two top models to explain L. salmonis abundance. Conclusions/Significance This is the first study to demonstrate a potential role of salmon farms in sea lice transmission to juvenile sockeye salmon during their critical early marine migration. Moreover, it demonstrates a major migration corridor past farms for sockeye that originated in the Fraser River, a complex of populations that are the subject of conservation concern. PMID:21347456

Top