Sample records for saluda hydroelectric project

  1. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... telephone. The FERC contact for the Saluda Hydroelectric Project is Lee Emery. Please call Lee Emery at (202) 502-8379 by 4 p.m. EST, June 11, 2010, or by e-mail at lee[email protected] , to receive specific...

  2. 75 FR 63166 - South Carolina Electric & Gas Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 516-459] South Carolina... 28, 2008 South Carolina Electric & Gas Company, licensee for the Saluda Hydroelectric Project, filed..., and Newberry counties, South Carolina. The license for Project No. 516 was issued for a period ending...

  3. 75 FR 4270 - Establishment of Class E Airspace; Saluda, SC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2009-0603; Airspace Docket No. 09-ASO-16] Establishment of Class E Airspace; Saluda, SC AGENCY: Federal... September 14, 2009 that establishes Class E Airspace at Saluda County Airport, Saluda, SC. DATES: Effective...

  4. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  5. Flood-inundation maps for the Saluda River from Old Easley Bridge Road to Saluda Lake Dam near Greenville, South Carolina

    USGS Publications Warehouse

    Benedict, Stephen T.; Caldwell, Andral W.; Clark, Jimmy M.

    2013-01-01

    Digital flood-inundation maps for a 3.95-mile reach of the Saluda River from approximately 815 feet downstream from Old Easley Bridge Road to approximately 150 feet downstream from Saluda Lake Dam near Greenville, South Carolina, were developed by the U.S. Geological Survey (USGS). The inundation maps, which can be accessed through the USGS Flood Inundation Mapping Science Web site at http://water.usgs.gov/osw/flood_inundation/, depict estimates of the areal extent and depth of flooding corresponding to selected water levels (stages) at the USGS streamgage at Saluda River near Greenville, South Carolina (station 02162500). Current conditions at the USGS streamgage may be obtained through the National Water Information System Web site at http://waterdata.usgs.gov/sc/nwis/uv/?site_no=02162500&PARAmeter_cd=00065,00060,00062. The National Weather Service (NWS) forecasts flood hydrographs at many places that are often collocated with USGS streamgages. Forecasted peak-stage information is available on the Internet at the NWS Advanced Hydrologic Prediction Service (AHPS) flood-warning system Web site (http://water.weather.gov/ahps/) and may be used in conjunction with the maps developed in this study to show predicted areas of flood inundation.In this study, flood profiles were computed for the stream reach by means of a one-dimensional step-backwater model. The model was calibrated using the most current stage-streamflow relations at USGS streamgage station 02162500, Saluda River near Greenville, South Carolina. The hydraulic model was then used to determine water-surface profiles for flood stages at 1.0-foot intervals referenced to the streamgage datum and ranging from approximately bankfull to 2 feet higher than the highest recorded water level at the streamgage. The simulated water-surface profiles were then exported to a geographic information system, ArcGIS, and combined with a digital elevation model (derived from Light Detection and Ranging [LiDAR] data with a 0

  6. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...

  7. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    NASA Astrophysics Data System (ADS)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  8. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  9. Divestiture summary report: Sale of Eklutna and Snettisham hydroelectric projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This report accompanies the legislative proposal to authorize sale of the two Alaskan Federal hydroelectric projects and close out the Alaska Power Administration (APA). The 78,210 kill Snettisham Project serving Juneau would be sold to the Alaska Energy Authority, a State corporation which owns six other hydroelectric projects. The 30,000 kill Eklutna Project serving the Anchorage and Matanuska Valley areas would be sold to the three electric utilities which now purchase power from that project. Terms and conditions for the sales are set out in negotiated Purchase Agreements. Key aspects include: (1) Development of Transition Plans within six months aftermore » Congress authorizes the divestiture. (2) Transaction Date to be set in the Transition Plans. (3) Description of assets to be transferred. (4) Price and payment terms. (5) Environmental Management Plans. (6) Protection of interests in several important non-power'' uses of project land and water. Under a separate agreement, the Purchasers assume responsibility for developing and implementing post-sale programs for protection, mitigation, and enhancement of fish and wildlife resources impacted by hydroelectric development in the Eldutna and Snettisham basins. The estimated sale proceeds to the United States Treasury are between $73.5 and $80.3 million, assuming the transactions are completed between October 1, 1992 and October 1, 1993. Eklutna and Snettisham are modest-sized, single-purpose hydroelectric projects involving small river basins entirely within Alaska. Locally, they are important long-term suppliers of economically-priced hydroelectric power. The sale terms and structure assure that the projects will continue to serve their intended purposes. Modest rate increases are expected over the short term, but long-term power rates are expected to be similar to those that would prevail under continued Federal ownership.« less

  10. Divestiture summary report: Sale of Eklutna and Snettisham hydroelectric projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-04-01

    This report accompanies the legislative proposal to authorize sale of the two Alaskan Federal hydroelectric projects and close out the Alaska Power Administration (APA). The 78,210 kill Snettisham Project serving Juneau would be sold to the Alaska Energy Authority, a State corporation which owns six other hydroelectric projects. The 30,000 kill Eklutna Project serving the Anchorage and Matanuska Valley areas would be sold to the three electric utilities which now purchase power from that project. Terms and conditions for the sales are set out in negotiated Purchase Agreements. Key aspects include: (1) Development of Transition Plans within six months aftermore » Congress authorizes the divestiture. (2) Transaction Date to be set in the Transition Plans. (3) Description of assets to be transferred. (4) Price and payment terms. (5) Environmental Management Plans. (6) Protection of interests in several important ``non-power`` uses of project land and water. Under a separate agreement, the Purchasers assume responsibility for developing and implementing post-sale programs for protection, mitigation, and enhancement of fish and wildlife resources impacted by hydroelectric development in the Eldutna and Snettisham basins. The estimated sale proceeds to the United States Treasury are between $73.5 and $80.3 million, assuming the transactions are completed between October 1, 1992 and October 1, 1993. Eklutna and Snettisham are modest-sized, single-purpose hydroelectric projects involving small river basins entirely within Alaska. Locally, they are important long-term suppliers of economically-priced hydroelectric power. The sale terms and structure assure that the projects will continue to serve their intended purposes. Modest rate increases are expected over the short term, but long-term power rates are expected to be similar to those that would prevail under continued Federal ownership.« less

  11. 76 FR 20657 - Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells... of Energy Projects has reviewed the application for license for the Wells Hydroelectric Project (FERC...

  12. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  13. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  14. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  15. Solomon Gulch hydroelectric project takes shape

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)

  16. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  17. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation of Teleconference On March 15... Mountain Pumped Storage Hydroelectric Project. This meeting has been cancelled. We will reschedule this...

  18. Effects of the Saluda Prevention Program: A Review of Controlled Evaluation Studies

    ERIC Educational Resources Information Center

    Espada-Sánchez, José P.; Hernández-Serrano, Olga

    2015-01-01

    The objective of the present study is to review the evidence on the effectiveness concerning the Saluda program, a school-based substance use prevention protocol used amongst adolescents. We provide a description of the program content and the results from nine controlled trials evaluating the program effectiveness. Participants were Spanish…

  19. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ...-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...., Bin 10221, Atlanta, GA 30308. Elizabeth Ann Brown, Deputy SHPO, Joey Charles, Georgia Power Alabama...

  20. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  1. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  2. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  3. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  4. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  5. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...

  6. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  7. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  8. 76 FR 73612 - Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC; Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...

  9. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  10. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to improve... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  11. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    ERIC Educational Resources Information Center

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  12. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested...

  13. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissell, Gael

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  14. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Betweenmore » 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new

  15. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery..., Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000...

  16. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...

  17. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    NASA Astrophysics Data System (ADS)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  18. 77 FR 14734 - Incidental Take Permit and Habitat Conservation Plan for PacifiCorp Klamath Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... (Oncorhynchus kisutch) as a result of operation and maintenance of its Klamath Hydroelectric Project (Project... term ``take'' as: ``harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to... the East Side and West Side canals, penstocks, turbines, and powerhouse facilities, (3) Operate and...

  19. 77 FR 13317 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...

  20. 76 FR 25307 - Incidental Take Permit and Habitat Conservation Plan for PacifiCorp Klamath Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... incidental take of one ESA-listed species as a result of operation and maintenance of the Klamath..., pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct... maintenance of the Klamath Hydroelectric Project (Project) and implementation of the Plan for a 10-year period...

  1. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  2. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...

  3. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  4. 78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...

  5. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...

  6. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...

  7. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...

  8. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting... staff of the U.S. Fish and Wildlife Service and Eagle Crest Energy as part of its on-going Section 7...

  9. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting... staff of the U.S. Fish and Wildlife Service and Eagle Crest Energy as part of its on-going Section 7...

  10. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purposemore » of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.« less

  11. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Bureau of Land Management to improve agency coordination and discuss the agencies' overlapping jurisdictions (pursuant to the Federal Land Policy and Management Act and the Federal Power Act), on the Eagle...

  12. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a.... Purpose of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to... Land Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage...

  13. Canton hydroelectric project: feasibility study. Final report, appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  14. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Amendment of License. b. Project No.: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11313-019] White Mountain...

  15. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  16. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...

  17. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...

  18. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...

  19. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...

  20. Geologic factors pertinent to the proposed A. J. Wiley Hydroelectric Project No. 2845, Bliss, Idaho

    USGS Publications Warehouse

    Malde, Harold E.

    1981-01-01

    The A.J. Wiley Hydroelectric Project is a proposal by the Idaho Power Company to develop hydroelectricity near Bliss, Idaho, by building a dam on the Snake River (fig. 1). The proposed dam would impound a narrow reservoir as deep as 85 feet in a free-flowing reach of the river that extends from the upper reach of water impounded by the Bliss Dam to the foot of the Lower Salmon Falls Dam, nearly 8 miles farther upstream. The proposed dam would be built in three sections: a spillway section and a powerhouse (intake) section to be constructed of concrete in the right-handed part, and an embankment section to be constructed as a zoned-fill of selected earth materials in the left-hand part. (Right and left are to be understood in the sense of looking downstream.) In August, 1979, the Idaho Power Company was granted a 3-year permit (Project No. 2845) by the Federal Energy Regulatory Commission (FERC) to make site investigations and environmental studies in the project area. A year later, on August 26, 1980, the company applied to FERC for a license to construct the project. On October 8, 1980, as explained in a letter by William W. Lindsay, Director of the Office of Electric Power Regulation, the company was given 90 days to correct certain deficiencies in the application. Because several of the deficiencies identified by Mr. Lindsay pertain to geologic aspects of the project, his letter is attached to this report as Appendix A. Hereafter in this report, the deficiencies listed by Mr. Lindsay are identified by the numerical entries in his letter. The Idaho Power Company is referred to as the applicant.

  1. The Effects of the Saluda Dam on the Surface-Water and Ground-Water Hydrology of the Congaree National Park Flood Plain, South Carolina

    USGS Publications Warehouse

    Conrads, Paul; Feaster, Toby D.; Harrelson, Larry G.

    2008-01-01

    The Congaree National Park was established '... to preserve and protect for the education, inspiration, and enjoyment of present and future generations an outstanding example of a near-virgin, southern hardwood forest situated in the Congaree River flood plain in Richland County, South Carolina' (Public Law 94-545). The resource managers at Congaree National Park are concerned about the timing, frequency, magnitude, and duration of flood-plain inundation of the Congaree River. The dynamics of the Congaree River directly affect ground-water levels in the flood plain, and the delivery of sediments and nutrients is constrained by the duration, extent, and frequency of flooding from the Congaree River. The Congaree River is the southern boundary of the Congaree National Park and is formed by the convergence of the Saluda and Broad Rivers 24 river miles upstream from the park. The streamflow of the Saluda River has been regulated since 1929 by the operation of the Saluda Dam at Lake Murray. The U.S. Geological Survey, in cooperation with the National Park Service, Congaree National Park, studied the interaction between surface water in the Congaree River and ground water in the flood plain to determine the effect Saluda Dam operations have on water levels in the Congaree National Park flood plain. Analysis of peak flows showed the reduction in peak flows after the construction of Lake Murray was more a result of climate variability and the absence of large floods after 1930 than the operation of the Lake Murray dam. Dam operations reduced the recurrence interval of the 2-year to 100-year peak flows by 6.1 to 17.6 percent, respectively. Analysis of the daily gage height of the Congaree River showed that the dam has had the effect of lowering high gage heights (95th percentile) in the first half of the year (December to May) and raising low gage heights (5th percentile) in the second half of the year (June to November). The dam has also had the effect of increasing the 1

  2. 78 FR 25434 - Henwood Associates, Inc.; Salmon Creek Hydroelectric Company; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Associates, Inc.; Salmon Creek Hydroelectric Company; Notice of Transfer of Exemption 1. By letter filed April 18, 2013, Henwood Associates, Inc. and Salmon Creek Hydroelectric Company informed the Commission that the exemption from licensing for the Salmon Creek Hydroelectric Project, FERC No. 3730, originally...

  3. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  4. River recreation management opportunities in hydroelectric relicensing

    Treesearch

    James R. Bernier

    1992-01-01

    Between now and 1993, more than 200 existing hydroelectric projects will come up for relicensing before FERC, the Federal Energy Regulatory Commission. This provides a rare opportunity for agencies and individuals to markedly influence the ecological and recreational balance of these projects. This paper presents an overview of the relicensing process, describes some...

  5. 75 FR 30021 - South Carolina Electric & Gas Company Saluda Hydroelectric Project; Notice of Proposed Restricted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... Service List for a Programmatic Agreement for Managing Properties Included In or Eligible for Inclusion In... agreement for managing properties included in, or eligible for inclusion in, the National Register of... request inclusion on the restricted service list, or may request that a restricted service list not be...

  6. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...

  7. 76 FR 67169 - Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  8. Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model

    USGS Publications Warehouse

    Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William

    1982-01-01

    The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.

  9. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... issued September 21, 1988,\\2\\ has been transferred to New Hampshire Hydro Associates. The project is...

  10. 76 FR 67174 - Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3 Hydroelectric LLC, Lock...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Hydroelectric LLC, Lock Hydro Friends Fund XLV, FFP Project 2 LLC; Notice of Competing Preliminary Permit... (Riverbank) and Solia 3 Hydroelectric LLC (Solia) and on May 3, 2011, Lock Hydro Friends Fund XLV (Lock Hydro...

  11. Bathymetric maps and water-quality profiles of Table Rock and North Saluda Reservoirs, Greenville County, South Carolina

    USGS Publications Warehouse

    Clark, Jimmy M.; Journey, Celeste A.; Nagle, Doug D.; Lanier, Timothy H.

    2014-01-01

    Lakes and reservoirs are the water-supply source for many communities. As such, water-resource managers that oversee these water supplies require monitoring of the quantity and quality of the resource. Monitoring information can be used to assess the basic conditions within the reservoir and to establish a reliable estimate of storage capacity. In April and May 2013, a global navigation satellite system receiver and fathometer were used to collect bathymetric data, and an autonomous underwater vehicle was used to collect water-quality and bathymetric data at Table Rock Reservoir and North Saluda Reservoir in Greenville County, South Carolina. These bathymetric data were used to create a bathymetric contour map and stage-area and stage-volume relation tables for each reservoir. Additionally, statistical summaries of the water-quality data were used to provide a general description of water-quality conditions in the reservoirs.

  12. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  13. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...

  14. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    .... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W..., FL 33527, (813) 659-3014; and Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027, (336) 589-6138 i...

  15. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less

  16. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,\\1\\ has been transferred to Troy Mills...

  17. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...

  18. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...

  19. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No... Engineers' Red Rock Dam. Staff prepared an environmental assessment (EA), which analyzes the potential... the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using...

  20. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    .... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W... Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Kevin Edwards, P.O. Box...

  1. Baseline health situation of communities affected by the Nam Theun 2 hydroelectric project in central Lao PDR and indicators for monitoring.

    PubMed

    Erlanger, Tobias E; Sayasone, Somphou; Krieger, Gary R; Kaul, Surinder; Sananikhom, Pany; Tanner, Marcel; Odermatt, Peter; Utzinger, Jurg

    2008-06-01

    Hydroelectric projects offer opportunities for infrastructure development and economic growth; yet, if not well designed, implemented and operated, they have the potential to negatively affect the health and well-being of local and distant downstream communities. Remote rural populations are particularly vulnerable to the sudden influx of men, materials and money, and associated population mixing that accompany project construction phases. Two large-scale baseline health surveys, carried out in 2001/2002 in two communities that were affected by the Nam Theun 2 hydroelectric project in central Lao PDR, were analysed. For the population to be resettled on the Nakai plateau it was observed that access to clean water and basic sanitation facilities was lacking. Faecal examinations revealed a high infection prevalence for Ascaris lumbricoides (67.7%), but relatively low prevalences for hookworm (9.7%), Taenia spp. (4.8%), Enterobius vermicularis (4.4%), Trichuris trichiura (3.9%), Strongyloides stercoralis (1.4%) and Opisthorchis viverrini (0.9%). For the population in the Xe Bang Fai downstream area, rapid diagnostic tests for malaria carried out in the rainy season found a prevalence below 1%, which might be explained by the complete coverage of households with insecticide-treated nets (99.8%). Anthropometric measurements in both populations suggest that wasting, stunting and underweight in under 5-year-old children were moderate to high; 15.9-17.5%, 40.4-55.7% and 35.8-55.7%, respectively. One out of six individuals aged above 14 years were malnourished, most likely as a result of early childhood wasting. Moderate anaemia, assessed by age- and sex-specific haemoglobin levels, was present in 43.8% (Nakai) and 54.9% of the individuals examined (Xe Bang Fai). Several indicators were extracted that can be utilised for monitoring changes in health, well-being and equity, as the project is implemented and operated.

  2. 76 FR 6612 - Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4 Hydroelectric, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...

  3. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 12478-003] Gibson Dam... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...

  4. 76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of...

  5. Feasibility of determination of low-head hydroelectric power development at existing sites: Brighton Dam hydroelectric development. Feasibility report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Will, Alan L.

    1979-04-01

    The redevelopment of the hydroelectric facility at Brighton Dam near Laurel, Maryland has been found to be both technically and financially feasible, the benefit to cost ratio being 1.53:1 compared with an equivalent coal-based generation source. Environmental impacts have been assessed as relatively slight, but some problems, due to poor water quality at the bottom of the reservoir are anticipated and solutions for these would have to be worked out. The benefit to cost ratio could thus be marginally decreased, but the relative costs of one alternative scheme compared to another would not be affected. There is no apparent impedimentmore » to proceeding with the work. The selected development would have a single hydroelectric generating unit of 500 kW rated capacity. The gross generation from the project would be 2,840,000 kWh in the year with average rainfall. It is estimated that the total project cost would be $734,000 (at third quarter 1978 price levels), with no allowance for funds during construction (AFDC). Based on 6.25% cost of money, the project would provide power at a levelized cost over the plant lifetime of approximately 23.3 mills per kWh with no AFDC or 24.6 mills/kWh with AFDC. At present, WSSC electrical power demands at Brighton Dam amount to 147,000 kWh per year which is met by Baltimore Gas and Electric Company (BG and E). This represents only 5% of the potential generation at the site and BG and E have agreed in principal to purchase the surplus power.« less

  6. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis and Clark and Teton...

  7. 76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12629-003] F&B Wood... the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric... Project No. 12629 on October 24, 2006. F&B Wood Corp.,117 FERC ] 62,059 (2006) \\3\\ See filings of May 9...

  8. 76 FR 67723 - CRD Hydroelectric, LLC; Notice of Application To Amend License and Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    .... Name of Project: Red Rock Hydroelectric Project. f. Location: The project is located at the U.S. Army Corps of Engineers Lake Red Rock Dam on the Des Moines River in Marion County, Iowa. g. Filed Pursuant.... Army Corps of Engineers' Lake Red Rock Dam. The applicant's proposal also includes the installation of...

  9. Authorizing the continued use of certain lands within the Sequoia National Park by portions of an existing hydroelectric project. A report submitted to the House of Representatives, Ninety-Ninth Congress, First Session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-01-01

    The report on House Joint Resolution 382, as amended, would allow a 10-year license for a hydroelectric plant currently operating within Sequoia National Park, but prohibit any expansion of the project. The first hydroelectric facility on the Kaweah River dates from the 1890s, shortly after the park was established to preserve California's sequoia trees. The legislation would require no additional federal funding and have no inflationary impact. Correspondence from the Department of Interior to the committee outlines the Department's philosophy and findings regarding the facility and suggests amendments along the lines of those proposed by the committee.

  10. 76 FR 14653 - BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ...). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to...

  11. 75 FR 66748 - City of Kaukauna, WI; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... City of Kaukauna, Wisconsin, licensee for the Badger-Rapide Croche Hydroelectric Project, filed an... thereunder. The Badger-Rapide Croche Hydroelectric Project is on the Fox River in Outagamie County, near the... operation of the Badger-Rapide Croche Hydroelectric Project, until such time as the Commission acts on its...

  12. 78 FR 38028 - Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206-030] Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric Project Biological...), NMFS will host a video conference to describe and discuss the terms and conditions in the Biological...

  13. 77 FR 785 - BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal...

  14. 76 FR 21885 - BOST5 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, near the town of Ninock near the City of Shreveport, Louisiana. g. Filed Pursuant to...

  15. 76 FR 14651 - BOST4 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the City of Coushatta, Louisiana. g. Filed Pursuant to...

  16. 77 FR 786 - BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to...

  17. Precipitation Estimates for Hydroelectricity

    NASA Technical Reports Server (NTRS)

    Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.

    2011-01-01

    Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.

  18. OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE WITH DAM TO LEFT OF HYDROELECTRIC POWER HOUSE AND ENTRANCE TO OLD LOCK CHAMBER ON RIGHT, VIEW TOWARDS NORTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  19. VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER HOUSE WITH OLD BYPASS IN FOREGROUND, SHOWING GLASS BLOCKS PROVIDING LIGHT TO BASEMENT OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  20. CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  1. ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  2. A critical analysis of the environment impact assessment report of the 2000 MW lower subansiri hydroelectric project with special reference to the down stream ecology and people's livelihood.

    PubMed

    Baruah, Debojit; Dutta, Ranjit; Hazarika, Lakhi Prasad; Sarmah, Sarada Kanta

    2011-10-01

    The Environment Impact Assessment (EIA) report of the 2000 MW Lower Subansiri Hydroelectric Project prepared by the WAPCOS (Water and Power Consultancy Service, 2003) indicates that downstream survey was done only up to 7 km from the dam site without giving much importance to the actual scenario and avoiding some most crucial ecological aspects. In the report, insufficient records of terrestrial flora, phytoplanktons and fish diversity are given. No records of aquatic macrophytes, riparian flora, zooplanktons, avian fauna, floodplain crops, besides peoples' livelihood and diverse habitat provided by the river in its downstream are presented in the report. Especially the wetlands, associated and influenced by the unregulated Subansiri River did not find any place in the EIA report. Interestingly, no mention of the Ganges Dolphin--Platanista gangetica gangetica Roxb. could be found in the report, whereas the river provides a healthy habitat for a good number of this critically endangered fresh water dolphin. From our pre-impact study, it is clear that rich downstream ecology of the river with its present and existing environmental scenario will be adversely affected due to the construction and operation of the proposed project, and there will be distinct possibilities of elimination of other native species. In addition, people's livelihood will be affected largely through alteration of the flow regime of the river. In-depth study with comprehensive documentation of all biotic and abiotic parameters is obligatory before taking any decision about the operation of the 2000 MW Lower Subansiri Hydroelectric Project.

  3. Status of downstream fish passage at hydroelectric projects in the northeast, USA

    USGS Publications Warehouse

    Odeh, Mufeed; Orvis, Curtis

    1997-01-01

    In the northeastern United States several guidance, protection, and conveyance methods have been employed to assist downstream migrating fish. Overlay racks, standard bar racks with close spacing, louvers, curtain walls, guide walls, netting, and other means have been used to guide and protect fish from entrainment. The design process of these facilities comprises consideration of various factors, including flow approach, attraction flow, guidance and protection devices, bypass location, conveyance mechanism, and plunge pool conditions. This paper presents the status of the design criteria for downstream fish passage facilities at hydroelectric sites in the northeast part of the United States. Examples of existing facilities are given.

  4. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    NASA Astrophysics Data System (ADS)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  5. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia

    PubMed Central

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments. PMID:26132139

  6. Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia.

    PubMed

    Benchimol, Maíra; Peres, Carlos A

    2015-01-01

    Mega hydropower projects in tropical forests pose a major emergent threat to terrestrial and freshwater biodiversity worldwide. Despite the unprecedented number of existing, under-construction and planned hydroelectric dams in lowland tropical forests, long-term effects on biodiversity have yet to be evaluated. We examine how medium and large-bodied assemblages of terrestrial and arboreal vertebrates (including 35 mammal, bird and tortoise species) responded to the drastic 26-year post-isolation history of archipelagic alteration in landscape structure and habitat quality in a major hydroelectric reservoir of Central Amazonia. The Balbina Hydroelectric Dam inundated 3,129 km2 of primary forests, simultaneously isolating 3,546 land-bridge islands. We conducted intensive biodiversity surveys at 37 of those islands and three adjacent continuous forests using a combination of four survey techniques, and detected strong forest habitat area effects in explaining patterns of vertebrate extinction. Beyond clear area effects, edge-mediated surface fire disturbance was the most important additional driver of species loss, particularly in islands smaller than 10 ha. Based on species-area models, we predict that only 0.7% of all islands now harbor a species-rich vertebrate assemblage consisting of ≥80% of all species. We highlight the colossal erosion in vertebrate diversity driven by a man-made dam and show that the biodiversity impacts of mega dams in lowland tropical forest regions have been severely overlooked. The geopolitical strategy to deploy many more large hydropower infrastructure projects in regions like lowland Amazonia should be urgently reassessed, and we strongly advise that long-term biodiversity impacts should be explicitly included in pre-approval environmental impact assessments.

  7. Itaipu royalties: The role of the hydroelectric sector in water resource management.

    PubMed

    Lorenzon, Alexandre Simões; Alvares Soares Ribeiro, Carlos Antonio; Rosa Dos Santos, Alexandre; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Soares, Vicente Paulo; Martins de Castro, Nero Lemos; Teixeira, Thaisa Ribeiro; Martins da Costa de Menezes, Sady Júnior; Silva, Elias; de Oliveira Barros, Kelly; Amaral Dino Alves Dos Santos, Gleissy Mary; Ferreira da Silva, Samuel; Santos Mota, Pedro Henrique

    2017-02-01

    For countries dependent on hydroelectricity, water scarcity poses a real risk. Hydroelectric plants are among the most vulnerable enterprises to climate change. Investing in the conservation of the hydrographic basin is a solution found by the hydropower sector. Given the importance of the Itaipu plant to the energy matrix of Brazil and Paraguay, the aim of this study is to review the current distribution of royalties from Itaipu, using the hydrographic basin as a of criterion of analysis. Approximately 98.73% of the Itaipu basin is in Brazil. The flow contributes 99% of the total electricity generated there, while the drop height of the water contributes only 1%. Under the current policy, royalties are shared equally between Brazil and Paraguay. In the proposed approach, each country would receive a percentage for their participation in the drop height and water flow in the output of the turbines, which are intrinsic factors for electricity generation. Thus, Brazil would receive 98.35% of the royalties and Paraguay, 1.65%. The inclusion of the hydrographic basin as a criterion for the distribution of royalties will promote more efficient water resource management, since the payment will be distributed throughout the basin of the plant. The methodology can be applied to hydroelectric projects worldwide. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS NORTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  9. PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS SOUTHEAST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  10. HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  11. HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  12. OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  13. OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, OLD BYPASS IN BACKGROUND, VIEW TOWARDS SOUTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  14. Big Creek Hydroelectric System, East & West Transmission Line, 241mile ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Big Creek Hydroelectric System, East & West Transmission Line, 241-mile transmission corridor extending between the Big Creek Hydroelectric System in the Sierra National Forest in Fresno County and the Eagle Rock Substation in Los Angeles, California, Visalia, Tulare County, CA

  15. OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND INTERIOR OF SOUTHWEST CORNER OF OLD BYPASS IN FOREGROUND, VIEW TOWARDS SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL

  16. 2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER TRANSFORMER BUILDING AND SERVICE SHED SEEN TO LEFT BELOW DIKE - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA

  17. 1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), SHOWING DAM AND POWERHOUSE IN FOREGROUND, VILLAGE COMPLEX IN RIGHT BACKGROUND, LOOKING WEST FROM ABOVE STATE HIGHWAY 291 - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA

  18. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water...

  19. 76 FR 44899 - FFP Missouri 17, LLC; BOST2 Hydroelectric LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... at the U.S. Army Corps of Engineers' (Corps) Columbia Lock & Dam, located on the Ouachita River near... & Dam Hydroelectric Project No. 13824-000 would consist of: (1) Two to four compact bulb turbines, with... Dam; (2) a 40-foot x 60-foot control building located on the South Carolina side of the river; and (3...

  20. The wildlife research & rescue programme for mammals at Hulu Terengganu Hydroelectric Project (HTHEP), Terengganu, Peninsular Malaysia

    NASA Astrophysics Data System (ADS)

    Nur-Syuhada, N.; Magintan, D.; Siti-Hajar, A. R.; Aisah, M. S.; Shukor, M. N.

    2016-11-01

    During the inundation of the Hulu Terengganu Hydroelectric Project in October 2014, a wildlife rescue programme was conducted to rescue animals found trapped within the expanding 61.6 km2 reservoir. A total of 244 mammals from 30 species, representing 12 families were rescued by various methods included baited live trapping, catchpoles, hoop nets and by hand. The order Rodentia recorded the highest amount of rescued individuals at 20.9%, followed by Primate (18.9), Dermoptera (11.1), Carnivora (0.8) and Pholidota (0.4). The genus Rattus recorded the highest individuals rescued (51 individuals) probably due to the rapid clear-cut logging of the forest prior to inundation. Notable mammals of high conservational value rescued included Manis javanicus (Pangolin), Presbytis melalophos siamensis (Mitred Leaf Monkey), Trachypithecus obscurus (Dusky Leaf Monkey), Hylobates lar (White Handed Gibbon), Nycticebus coucang (Slow Loris), Galeopterus variegatus (Sunda Colugo), Callosciurus nigrovittatus (Sunda Black-banded Squirrel), Ratufa spp. (Giant Squirrels), and Sundasciurus hippurus (Horse-tailed Squirrel). Various data and biological samples were collected from the mammals rescued prior to their release at the nearest forest reserves. Rescue operation enabled the inventory and comprehensive data collection of various arboreal and rare mammal species that are hard to capture using the traditional survey method.

  1. 77 FR 34033 - Public Utility District No. 1 of Douglas County; Notice of Authorization for Continued Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... District No. 1 of Douglas County; Notice of Authorization for Continued Project Operation On May 27, 2010, the Public Utility District No. 1 of Douglas County, licensee for the Wells Hydroelectric Project... regulations thereunder. The Wells Hydroelectric Project is located on the Columbia River in Douglas, Okanogan...

  2. 76 FR 67174 - Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14157-000; 14161-000; 14184-000] Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice.... 7 LLC (Riverbank) and on May 3, 2011, Lock Hydro Friends Fund XXXVIII (Lock Hydro) filed preliminary...

  3. Ultra-low-head hydroelectric technology: A review

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhou, Daqing; Deng, Zhiqun

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the currentmore » achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.« less

  4. 7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO THE LEFT, NORTH ELEVATION OF OFFICE BUILDING TO THE RIGHT, VIEW TO THE EAST. CONCRETE 'PATH' IN FOREGROUND IS THE CONDUIT THROUGH WHICH POWER CABLES RUN FROM THE TRANSFORMERS TO THE 115 KV SUBSTATION. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO

  5. Future Impacts of Hydroelectric Power Development on Methylmercury Exposures of Canadian Indigenous Communities.

    PubMed

    Calder, Ryan S D; Schartup, Amina T; Li, Miling; Valberg, Amelia P; Balcom, Prentiss H; Sunderland, Elsie M

    2016-12-06

    Developing Canadian hydroelectric resources is a key component of North American plans for meeting future energy demands. Microbial production of the bioaccumulative neurotoxin methylmercury (MeHg) is stimulated in newly flooded soils by degradation of labile organic carbon and associated changes in geochemical conditions. We find all 22 Canadian hydroelectric facilities being considered for near-term development are located within 100 km of indigenous communities. For a facility in Labrador, Canada (Muskrat Falls) with planned completion in 2017, we probabilistically modeled peak MeHg enrichment relative to measured baseline conditions in the river to be impounded, downstream estuary, locally harvested fish, birds and seals, and three Inuit communities. Results show a projected 10-fold increase in riverine MeHg levels and a 2.6-fold increase in estuarine surface waters. MeHg concentrations in locally caught species increase 1.3 to 10-fold depending on time spent foraging in different environments. Mean Inuit MeHg exposure is forecasted to double following flooding and over half of the women of childbearing age and young children in the most northern community are projected to exceed the U.S. EPA's reference dose. Equal or greater aqueous MeHg concentrations relative to Muskrat Falls are forecasted for 11 sites across Canada, suggesting the need for mitigation measures prior to flooding.

  6. Energy Perspective: Is Hydroelectricity Green?

    ERIC Educational Resources Information Center

    Childress, Vincent W.

    2009-01-01

    The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…

  7. Hydroelectric production from Brazil's São Francisco River could cease due to climate change and inter-annual variability.

    PubMed

    de Jong, Pieter; Tanajura, Clemente Augusto Souza; Sánchez, Antonio Santos; Dargaville, Roger; Kiperstok, Asher; Torres, Ednildo Andrade

    2018-09-01

    By the end of this century higher temperatures and significantly reduced rainfall are projected for the Brazilian North and Northeast (NE) regions due to Global Warming. This study examines the impact of these long-term rainfall changes on the Brazilian Northeast's hydroelectric production. Various studies that use different IPCC models are examined in order to determine the average rainfall reduction by the year 2100 in comparison to baseline data from the end of the 20th century. It was found that average annual rainfall in the NE region could decrease by approximately 25-50% depending on the emissions scenario. Analysis of historical rainfall data in the São Francisco basin during the last 57years already shows a decline of more than 25% from the 1961-90 long-term average. Moreover, average annual rainfall in the basin has been below its long-term average every year bar one since 1992. If this declining trend continues, rainfall reduction in the basin could be even more severe than the most pessimistic model projections. That is, the marked drop in average rainfall projected for 2100, based on the IPCC high emissions scenario, could actually eventuate before 2050. Due to the elasticity factor between rainfall and streamflow and because of increased amounts of irrigation in the São Francisco basin, the reduction in the NE's average hydroelectric production in the coming decades could be double the predicted decline in rainfall. Conversely, it is estimated that wind power potential in the Brazilian NE will increase substantially by 2100. Therefore both wind and solar power will need to be significantly exploited in order for the NE region to sustainably replace lost hydroelectric production. Copyright © 2018 Elsevier B.V. All rights reserved.

  8. [Twenty-year surveillance of insects relevant to public health during the construction of hydroelectric facilities in Antioquia, Colombia].

    PubMed

    Zuluaga, Walter Alonso; López, Yolanda Lucía; Osorio, Lisardo; Salazar, Luis Fernando; González, Marta Claudia; Ríos, Claudia María; Wolff, Marta Isabel; Escobar, José Pablo

    2012-09-01

    Entomological studies conducted in large hydroelectric infrastructure projects are a tool for the prevention and control of vector-borne diseases. These diseases emerge as a consequence of changes made to the terrain that often increase the natural and artificial mosquito larval habitats. Many of these insects are of public health importance and population increases result in an increased risk of disease transmission. The culicine (mosquito) and phlebotomine (sand fly) populations were characterized in the area of the Porce II and Porce III hydroelectric projects of Antioquia between 1990 to 2009. Periodical entomological samplings were made in the area of impact, in the workers camps, and construction sites. Adult specimens were captured with nets, Shannon light traps, CDC light traps, and protected human bait. Mosquito larvae of the following species were identified: Culex coronator, Culex nigripalpus, Culex corniger, Culex quinquefasciatus and Limatus durhami. The most frequently identifiers of larval habitats were low tanks, waste cans, tires, and aquatic plants. Aedes aegypti specimens were captured in only two rural locations from two municipalities within the area of influence. Specimens from the following mosquito genera were captured in forest areas: Aedes, Mansonia, Culex, Psorophora, Wyeomyia, Phonyomyia, Uranotaenia, Haemagogus and Sabethes. The most important mosquito found was Haemogogus janthinomis, an efficient yellow fever vector in Colombia. The area has been endemic for leishmaniasis and in the current study, 20 species of Lutzomyia sand flies, potential vectors, were identified. Among malaria vectors, the most important species found in the area were Anopheles nuneztovari and Anopheles pseudopunctipennis. A wide variety of vectors were discovered in the area of the Porce II and Porce III hydroelectric projects, and many of these were relevant for public health. Further monitoring will be necessary to minimize disease transmission risks among the

  9. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    NASA Astrophysics Data System (ADS)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  10. Hydroelectric Generating Facilities General Permit ...

    EPA Pesticide Factsheets

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  11. 78 FR 60271 - Project No. 13599-001

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13599-001] Green Power... (FPA), proposing to study the feasibility of the Lake 3160 Hydroelectric Project (project) to be.... The project would occupy about 475 acres of lands within the Tongass National Forest managed by the U...

  12. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    PubMed

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  13. MALACOLOGICAL INVESTIGATION OF THE FULLY OPERATIONAL NAM THEUN 2 HYDROELECTRIC DAM PROJECT IN KHAMMOUANE PROVINCE, CENTRAL LAO PDR.

    PubMed

    Sri-aroon, Pusadee; Chusongsang, Phiraphol; Chusongsang, Yupa; Limpanont, Yanin; Surinthwong, Pornpimol; Vongphayloth, Khamsing; Brey, Paul T

    2015-09-01

    We conducted a malacological investigation in four districts of the Nam Theun 2 (NT2) hydroelectric dam project area, Khammouane Province, central Lao PDR (Nakai, Gnommalath, Mahaxai and Xe Bang Fai), after the first and second years of full operation in March 2010 and November 2011 to determine health risks for humans. A total 10,863 snail specimens (10 families/23 species) from 57 sampling stations and 12,902 snail specimens (eight families/21 species) from 66 sampling stations were collected in 2010 and 2011, respectively. Neotricula aperta (gamma race), the intermediate host for Schistosoma mekongi, was found in large numbers (5,853 specimens) in 2010 in Nam Gnom (downstream) at Station 25 (Mueang Gnommalath: Gnommalath District) and in fewer numbers (170 specimens) at Station 26 (Ban Thathod: Gnommalath District). In 2011, significantly fewer numbers (434 specimens) of N. aperta were found at Station 25. No snails were found to be infected with S. mekongi; however, 3.6% and 0.45% of Bithynia (D.). s. goniomphalos specimens collected were found to be infected with Opisthorchis viverrini (human liver fluke) during 2010 and 2011, respectively. Pomacea canaliculata, the rice crop pest, the intermediate host of Angiostrongylus (Parastrongylus) cantonensis, was found in the greatest numbers during 2010 and 2011; the prevalence increased significantly from 1.3% in 2010 to 53.3% in 2011. We also found seasonal variation in snail populations in terms of abundance and diversity. The snail fauna and risk for transmission of parasitic diseases need to be monitored continuously to evaluate the long-term impact of the dam project.

  14. Climate change impacts on high-elevation hydroelectricity in California

    NASA Astrophysics Data System (ADS)

    Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.

    2014-03-01

    While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.

  15. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development IV: Fish Mortality Resulting From Turbine Passage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turbak, Susan C.; Reichle, Donna R.; Shriner, Carole R.

    1981-01-01

    The purpose of this report is to provide summary information for use by potential developers and regulators of small-scale hydroelectric projects (defined as existing dams that can be retrofitted to a total site capacity of ≤30 MW), where turbine-related mortality of fish is a potential issue affecting site-specific development. Mitigation techniques for turbine-related mortality are not covered in this report.

  16. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    PubMed

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.

  17. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  18. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  19. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  20. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    PubMed

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  1. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    NASA Astrophysics Data System (ADS)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  2. Hydroelectric System Response to Part Load Vortex Rope Excitation

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.

    2016-11-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.

  3. Planning status report: water resources appraisal for hydroelectric licensing, Potomac River basin, Pennsylvania, Maryland, West Virginia, Virginia, and District of Columbia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-01-01

    Updated information on water resources in the Potomac River Basin is presented for use by the FERC and its staff when considering hydroelectric licensing and other work. The report presents data on water resource developments, existing and potential, and on water use by existing and projected steam-electric generating facilities. Past and present planning studies are summarized.

  4. WTS-4 system verification unit for wind/hydroelectric integration study

    NASA Technical Reports Server (NTRS)

    Watts, A. W.

    1982-01-01

    The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

  5. The James Bay Project: Reaction or Action?

    ERIC Educational Resources Information Center

    Mackwood, Gae

    1991-01-01

    Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…

  6. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less

  7. National Hydroelectric Power Resources Study:Regional Assessment: Volume XXIII: Alaska and Hawaii

    DTIC Science & Technology

    1981-09-01

    amount of recoverable geothermal energy is still unknown, a test well (HGP-A) was drilled 6,450 feet into the eastern rift of Kilauea volcano on...US Army Corps of Engineers National Hydroelectric Power Resources Study Volume XXIII September 1 981 Regional Assessment: Alaska and Hawaii ...National Hydroelectric Power Resources Study: Final Regional Assessment; Alaska and Hawaii IS. PERFORMING ORG. REPORT NUMBER IWR 82-𔃻-23 7. AUTHOR(a) 8

  8. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  9. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  10. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  11. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and Western Minnesota Municipal Power Agency (transferee) filed an application for transfer of license for the...

  12. 53. SIPHON NO. 1, SANTA ANA RIVER NO. 2 PROJECT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. SIPHON NO. 1, SANTA ANA RIVER NO. 2 PROJECT, EXHIBIT L, PROJECT 1933, MAY 1973. SCE drawing no. 5110869 (sheet no. 11; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  13. 3. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  14. 1. SWIMMING POOL. VIEW TO WEST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. SWIMMING POOL. VIEW TO WEST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  15. 2. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT

  16. Carbon emission from global hydroelectric reservoirs revisited.

    PubMed

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.

  17. 78 FR 55072 - Sutton Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2013, Sutton Hydroelectric Company, LLC filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act...

  18. Comparison of Gross Greenhouse Gas Fluxes from Hydroelectric Reservoirs in Brazil with Thermopower Generation

    NASA Astrophysics Data System (ADS)

    Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.

    2013-05-01

    shown a large variation in the data on greenhouse gas emissions, which would suggest that more care, should be taken in the choice of future projects by the Brazilian electrical sector. The emission of CH4 by hydroelectric reservoirs is always unfavorable, since even if the carbon has originated with natural sources, it is part of a gas with higher GWP in the final calculation. Emissions of CO2 can be attributed in part to the natural carbon cycle between the atmosphere and the water of the reservoir. Another part could be attributed to the decomposition of organic material, caused by the hydroelectric dam.

  19. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    PubMed

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  20. 77 FR 56637 - FirstLight Hydro Generating Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-000] FirstLight Hydro...Light Hydro Generating Company, licensee for the Scotland Hydroelectric Project, filed an Application... license for Project No. 2662 [[Page 56638

  1. Itaipu: never underestimate the Latins. [Paraguay/Brazil binational project] (in English and Spanish)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-04-06

    The Itaipu hydroelectric project, a joint effort of Brazil and Paraguay (with a cost of US $16 to 18 billion), will be finished in December 1989. The project is situated on the Parana River, 14 km beyond the Puente de da Amistad (Friendship Bridge), which connects the city Presidente Stroessner, in Paraguay, with Foz do Iguacu, in Brazil. It is considered today not only the biggest hydroelectric plant in the world, but also a great socio-economic boom in the making. Itaipu will add a total of 12.6-million kilowatt-hours (kWh) of hydroelectricity to the region, an equivalent of 600,000 barrels ofmore » oil daily (b/d). This issue of Energy Detente reviews the progress of Itaipu. Also appearing in this issue is the fuel price/tax series and the principal industrial fuel prices for April 1983 for countries of the Eastern Hemisphere.« less

  2. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... materials; (6) A change in land cover on major ground water infiltration areas when the amount of land that... infiltration areas; (11) Hydroelectric power projects, including pumped storage projects; (12) Projects or...

  3. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... materials; (6) A change in land cover on major ground water infiltration areas when the amount of land that... infiltration areas; (11) Hydroelectric power projects, including pumped storage projects; (12) Projects or...

  4. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... materials; (6) A change in land cover on major ground water infiltration areas when the amount of land that... infiltration areas; (11) Hydroelectric power projects, including pumped storage projects; (12) Projects or...

  5. 18 CFR 401.35 - Classification of projects for review under Section 3.8 of the Compact.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... materials; (6) A change in land cover on major ground water infiltration areas when the amount of land that... infiltration areas; (11) Hydroelectric power projects, including pumped storage projects; (12) Projects or...

  6. 77 FR 50493 - Sam Rayburn Dam Project Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ...-purpose reservoir projects with hydroelectric power facilities constructed and operated by the U.S. Army... Corporate Operations, Southwestern Power Administration, One West Third, Tulsa, OK 74103, (918) 595-6680 or...

  7. Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA

  8. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regardingmore » hydroelectric power development are discussed.« less

  9. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC... feet National Geodetic Vertical Datum; (2) a dam comprised of (a) a 126- foot-wide, 13-foot-high...

  10. 75 FR 70226 - Mackay Bar Corporation; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3041-004] Mackay Bar... Mackay Bar Corporation, licensee for the Hettinger Hydroelectric Project, filed an Application to..., notice is hereby given that an annual license for Project No. 3041 is issued to the Mackay Bar...

  11. Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA

  12. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  13. The influence of changes in lifestyle and mercury exposure in riverine populations of the Madeira River (Amazon Basin) near a hydroelectric project.

    PubMed

    Hacon, Sandra S; Dórea, José G; Fonseca, Márlon de F; Oliveira, Beatriz A; Mourão, Dennys S; Ruiz, Claudia M V; Gonçalves, Rodrigo A; Mariani, Carolina F; Bastos, Wanderley R

    2014-02-26

    In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents) that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615) and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001) in less isolated communities near to the capital of Porto Velho (median 2.32 ppm) than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm). Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics.

  14. The Influence of Changes in Lifestyle and Mercury Exposure in Riverine Populations of the Madeira River (Amazon Basin) near a Hydroelectric Project

    PubMed Central

    Hacon, Sandra S.; Dórea, José G.; Fonseca, Márlon de F.; Oliveira, Beatriz A.; Mourão, Dennys S.; Ruiz, Claudia M. V.; Gonçalves, Rodrigo A.; Mariani, Carolina F.; Bastos, Wanderley R.

    2014-01-01

    In the Amazon Basin, naturally occurring methylmercury bioaccumulates in fish, which is a key source of protein consumed by riverine populations. The hydroelectric power-plant project at Santo Antônio Falls allows us to compare the Hg exposure of riverine populations sparsely distributed on both sides of the Madeira river before the area is to be flooded. From 2009 to 2011, we concluded a population survey of the area (N = 2,008; representing circa 80% of community residents) that estimated fish consumption and mercury exposure of riverine populations with different degrees of lifestyle related to fish consumption. Fish samples from the Madeira river (N = 1,615) and 110 species were analyzed for Hg. Hair-Hg was significantly lower (p < 0.001) in less isolated communities near to the capital of Porto Velho (median 2.32 ppm) than in subsistence communities in the Cuniã Lake, 180 km from Porto Velho city (median 6.3 ppm). Fish Hg concentrations ranged from 0.01 to 6.06 µg/g, depending on fish size and feeding behavior. Currently available fish in the Madeira river show a wide variability in Hg concentrations. Despite cultural similarities, riparians showed hair-Hg distribution patterns that reflect changes in fish-eating habits driven by subsistence characteristics. PMID:24577285

  15. Mines as lower reservoir of an UPSH (Underground Pumping Storage Hydroelectricity): groundwater impacts and feasibility

    NASA Astrophysics Data System (ADS)

    Bodeux, Sarah; Pujades, Estanislao; Orban, Philippe; Dassargues, Alain

    2016-04-01

    The energy framework is currently characterized by an expanding use of renewable sources. However, their intermittence could not afford a stable production according to the energy demand. Pumped Storage Hydroelectricity (PSH) is an efficient possibility to store and release electricity according to the demand needs. Because of the topographic and environmental constraints of classical PSH, new potential suitable sites are rare in countries whose topography is weak or with a high population density. Nevertheless, an innovative alternative is to construct Underground Pumped Storage Hydroelectricity (UPSH) plants by using old underground mine works as lower reservoir. In that configuration, large amount of pumped or injected water in the underground cavities would impact the groundwater system. A representative UPSH facility is used to numerically determine the interactions with surrounding aquifers Different scenarios with varying parameters (hydrogeological and lower reservoir characteristics, boundaries conditions and pumping/injection time-sequence) are computed. Analysis of the computed piezometric heads around the reservoir allows assessing the magnitude of aquifer response and the required time to achieve a mean pseudo-steady state under cyclic solicitations. The efficiency of the plant is also evaluated taking the leakage into the cavity into account. Combining these two outcomes, some criterions are identified to assess the feasibility of this type of projects within potential old mine sites from a hydrogeological point of view.

  16. Risk Factors for the Presence of Aedes aegypti and Aedes albopictus in Domestic Water-Holding Containers in Areas Impacted by the Nam Theun 2 Hydroelectric Project, Laos

    PubMed Central

    Hiscox, Alexandra; Kaye, Angela; Vongphayloth, Khamsing; Banks, Ian; Piffer, Michele; Khammanithong, Phasouk; Sananikhom, Pany; Kaul, Surinder; Hill, Nigel; Lindsay, Steven W.; Brey, Paul T.

    2013-01-01

    We assessed risk factors for vectors of dengue and chikungunya viruses near a new hydroelectric project, Nam Theun 2, in Laos. Immature stages of Aedes aegypti were found only in sites within 40 km of the urban provincial capital, but Aedes albopictus was found throughout. Aedes aegypti pupae were most common in water storage jars (odds ratio [OR] = 4.72) and tires (OR = 2.99), and Ae. albopictus pupae were associated with tires in 2009 (OR = 10.87) and drums, tires, and jars in 2010 (drums OR = 3.05; tires OR = 3.45, jars OR = 6.59). Compared with water storage vessels, containers used for hygiene, cooking, and drinking were 80% less likely to harbor Ae. albopictus pupae in 2010 (OR = 0.20), and discarded waste was associated with a 3.64 increased odds of infestation. Vector control efforts should focus on source reduction of water storage containers, particularly concrete jars and tires. PMID:23458958

  17. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    EPA Pesticide Factsheets

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  18. Renewable Energy Project Financing: Improved Guidance and Information Sharing Needed for DOD Project-Level Officials

    DTIC Science & Technology

    2012-04-01

    certain energy related military construction projects. The Navy used this authority for its geothermal plant at Naval Air Weapons Station China Lake...electric energy generated from solar, wind, biomass, landfill gas, ocean (including tidal, wave, current, and thermal), geothermal , municipal solid...thermal; geothermal , including electricity and heat pumps; municipal solid waste; new hydroelectric generation capacity achieved from increased

  19. 78 FR 16490 - Placer County Water Agency; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2079-000] Placer County Water Agency; Notice of Authorization for Continued Project Operation On February 23, 2011, the Placer County Water Agency, licensee for the Middle Fork American River Hydroelectric Project, filed an Application for a New License pursuant to the Federa...

  20. Deer Creek Dam, Hydroelectric Powerplant, 868 feet/291 degrees from intersection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Deer Creek Dam, Hydroelectric Powerplant, 868 feet/291 degrees from intersection of dam complex access road with U.S. Highway 189, 1,340 feet/352 degrees from the dam spillway overpass, Charleston, Wasatch County, UT

  1. Evaluation methodology for flood damage reduction by preliminary water release from hydroelectric dams

    NASA Astrophysics Data System (ADS)

    Ando, T.; Kawasaki, A.; Koike, T.

    2017-12-01

    IPCC AR5 (2014) reported that rainfall in the middle latitudes of the Northern Hemisphere has been increasing since 1901, and it is claimed that warmer climate will increase the risk of floods. In contrast, world water demand is forecasted to exceed a sustainable supply by 40 percent by 2030. In order to avoid this expectable water shortage, securing new water resources has become an utmost challenge. However, flood risk prevention and the secure of water resources are contradictory. To solve this problem, we can use existing hydroelectric dams not only as energy resources but also for flood control. However, in case of Japan, hydroelectric dams take no responsibility for it, and benefits have not been discussed accrued by controlling flood by hydroelectric dams, namely by using preliminary water release from them. Therefore, our paper proposes methodology for assessing those benefits. This methodology has three stages as shown in Fig. 1. First, RRI model is used to model flood events, taking account of the probability of rainfall. Second, flood damage is calculated using assets in inundation areas multiplied by the inundation depths generated by that RRI model. Third, the losses stemming from preliminary water release are calculated, and adding them to flood damage, overall losses are calculated. We can evaluate the benefits by changing the volume of preliminary release. As a result, shown in Fig. 2, the use of hydroelectric dams to control flooding creates 20 billion Yen benefits, in the probability of three-day-ahead rainfall prediction of the assumed maximum rainfall in Oi River, in the Shizuoka Pref. of Japan. As the third priority in the Sendai Framework for Disaster Risk Reduction 2015-2030, `investing in disaster risk reduction for resilience - public and private investment in disaster risk prevention and reduction through structural and non-structural measures' was adopted. The accuracy of rainfall prediction is the key factor in maximizing the benefits

  2. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    NASA Astrophysics Data System (ADS)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  3. 4. PENSTOCKS. EXHIBIT L, SANTA ANA RIVER NO. 1 PROJECT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. PENSTOCKS. EXHIBIT L, SANTA ANA RIVER NO. 1 PROJECT, APR. 30, 1945. SCE drawing no. 523197 (sheet no. 7; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, SAR-1 Forebay & Penstock, Redlands, San Bernardino County, CA

  4. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  5. Ergonomic evaluation of the environment: a case study in a control room of the hydroelectric sector.

    PubMed

    Falcão, Christianne Soares; Soares, Marcelo Marcio

    2012-01-01

    Representative systematic evaluation studies of the workspace and the extent to which that space is suitable for performing tasks have been developed by professionals engaged on finding evidence as to the importance of users and designers being joint participants in drawing up projects. In this context, this paper sets out to evaluate the environment of a control room in the hydroelectric sector, based on a multidisciplinary method which integrates ergonomics, architecture and environmental psychology so as to assess the influence of space on the user, and thus to identify the user's level of satisfaction with it. It was observed that some adaptation strategies of the space for activities were not implemented satisfactorily, resulting in the need for further studies on making workspaces suitable.

  6. 46. GENERAL MAP OF SANTA ANA NO. 3 PROJECT MAP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. GENERAL MAP OF SANTA ANA NO. 3 PROJECT MAP OF ALL THREE POWER HOUSE SYSTEMS, EXHIBIT J, JAN. 25, 1956. SCE drawing no. 535041 (sheet no. 1; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  7. Projects in eastern Canada encounter strong opposition. [Hydroelectric power plants planned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carr, F.H.

    1993-09-13

    At the end of August, Quebec's provincial utility submitted a long-awaited environmental impact statement on its proposed Great Whale project near Hudson Bay. It faces opposition, as does a big project planned in Labrador. Hydro-Quebec's EIS says its $10-billion, 3,210-Mw project [open quotes]would have impacts that are generally moderate and localized, and that can be mitigated,[close quotes] according to a utility spokeswoman. But environmental and Native American groups opposed to the project say its three powerhouses on the Great Whale River and 600 sq miles of new impoundments would destroy hunting and fishing areas and mar the environment. Five federalmore » and provincial review panels will determine over the next several weeks if the EIS meets their requirements.« less

  8. River flow maintenance turbine for Milner Hydroelectric Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carson, J.L.; Holveck, W.H.; Gokhman, A.

    1995-12-31

    The Milner Hydroelectric Project on the Snake River in Idaho was commissioned in 1992. The project included renovation of an existing dam, which was built to supply irrigation water to a canal system, construction of a new spillway, and the addition of a new powerhouse. The forebay of the main powerhouse is located on a combination power and irrigation canal, approximately 3500 feet (1070 m) from the dam, with a short tailrace returning the water to the river. There are two Kaplan turbines installed in the main powerhouse, rated at 1000 cfs and 4000 cfs respectively at a net headmore » of 150 feet. The FERC license required that a target flow of 200 cfs be released from the dam to maintain a stream flow between the dam and the powerhouse. In order to utilize this flow, a small powerhouse was constructed at the toe of the dam. The site conditions favored a vertical axial flow turbine, with a net head of 56 feet. As the flow is constant and the head is fairly constant, a fixed geometry turbine was selected, to be controlled solely by the intake gate. Due to the higher head, the main powerhouse can generate more power per unit of flow than can the bypass turbine. Therefore, it is undesirable for the discharge of the bypass turbine to be any greater than required by the license. Also, the release flow is determined by a river gauge, the accuracy of which is unknown, but assumed to be within five percent. In order to meet these two requirements, the turbine was specified to have manually adjustable runner blades to obtain the required release flow of 200 cfs at any head between 55 and 58 feet.« less

  9. Small hydroelectric power plant for Aztec, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frey, E.W.

    1982-05-01

    Preliminary engineering results and the outcome of other specific studies associated with the establishment of a hydroelectric power plant at Aztec, New Mexico, are presented, with particular emphasis on estimated costs of construction and long-term operation. Four alternative levels of effort were evaluated. Recommendations, based primarily on cost effectiveness, are presented along with material useful as a basis for a possible follow-on Phase II study. At least three levels of effort appear economically attractive alternatives for the city to pursue.

  10. Low-flow frequency and flow duration of selected South Carolina streams in the Saluda, Congaree, and Edisto River basins through March 2009

    USGS Publications Warehouse

    Feaster, Toby D.; Guimaraes, Wladmir B.

    2012-01-01

    Part of the mission of the South Carolina Department of Health and Environmental Control and the South Carolina Department of Natural Resources is to protect and preserve South Carolina's water resources. Doing so requires an ongoing understanding of streamflow characteristics of the rivers and streams in South Carolina. A particular need is information concerning the low-flow characteristics of streams, which is especially important for effectively managing the State's water resources during critical flow periods, such as during periods of severe drought like South Carolina has experienced in the last decade or so. The U.S. Geological Survey, in cooperation with the South Carolina Department of Health and Environmental Control, initiated a study in 2008 to update low-flow statistics at continuous-record streamgaging stations operated by the U.S. Geological Survey in South Carolina. This report presents the low-flow statistics for 25 selected streamgaging stations in the Saluda, Congaree, and Edisto River basins in South Carolina, and includes flow durations for the 5-, 10-, 25-, 50-,75-, 90-, and 95-percent exceedances and the annual minimum 1-, 3-, 7-, 14-, 30-, 60-, and 90-day average flows with recurrence intervals of 2, 5, 10, 20, 30, and 50 years, depending on the length of record available at the streamgaging station. The low-flow statistics were computed from records available through March 31, 2009. Of the 25 streamgaging stations for which recurrence interval computations were made, 20 were compared to low-flow statistics that were published in previous U.S. Geological Survey reports. A comparison of the low-flow statistics for the annual minimum 7-day average streamflow with a 10-year recurrence interval (7Q10) from this study with the most recently published values indicates that 18 of the 20 streamgaging stations have values lower than the previous published values. The low-flow statistics are influenced by length of record, hydrologic regime under

  11. Optimal control of hydroelectric facilities

    NASA Astrophysics Data System (ADS)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  12. Proliferation of Hydroelectric Dams in the Andean Amazon and Implications for Andes-Amazon Connectivity

    PubMed Central

    Finer, Matt; Jenkins, Clinton N.

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics. PMID:22529979

  13. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    PubMed

    Finer, Matt; Jenkins, Clinton N

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  14. Dams in the Amazon: Belo Monte and Brazil's hydroelectric development of the Xingu River Basin.

    PubMed

    Fearnside, Phillip M

    2006-07-01

    Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil's proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country's national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.

  15. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteriamore » which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.« less

  16. 75 FR 38543 - Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To Remove Four Dams on the Klamath River in California and Oregon AGENCY: Department of the Interior. ACTION: Notice; correction. SUMMARY: The Department of the...

  17. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...

  18. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...

  19. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...

  20. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...

  1. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation... generating facilities with the power marketing agencies. (b) Applicability. This regulation applies to all...

  2. 76 FR 18213 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2778-062] Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available...

  3. 76 FR 18214 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2055-087] Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available...

  4. Analysis of synchronous and induction generators used at hydroelectric power plant

    NASA Astrophysics Data System (ADS)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  5. [Fishery resource protection by artificial propagation in hydroelectric development: Lixianjiang River drainage in Yunnan as an example].

    PubMed

    Yang, Yong-Hong; Yang, Jun-Xing; Pan, Xiao-Fu; Zhou, Wei; Yang, Mei-Lin

    2011-04-01

    Hydroelectric developments can result in a number of negative environmental consequences. Conservation aquaculture is a branch of science derived from conservation and population recovery studies on endangered fishes. Here we discuss the impacts on fishes caused by hydropower projects in Lixianjiang, and evaluate effects and problems on the propagation of Parazacco spilurus, Hemibagrus pluriradiatus, Neolissochilus benasi and Semilabeo obscurus. A successful propagation project includes foraging ecology in fields, pond cultivation, juvenile fish raising, prevention and curing on fish disease, genetic management, artificial releasing and population monitoring. Artificial propagation is the practicable act on genetic intercommunication, preventing population deterioration for fishes in upper and lower reaches of the dam. For long-term planning, fish stocks are not suitable for many kind of fishes, but can prevent fishes from going extinct in the wild. Basic data collection on fish ecology, parent fish hunting, prevention on fish disease are the most important factors on artificial propagation. Strengthening the genetic management of stock population for keeping a higher genetic diversity can increase the success of stock enhancement. The works on Lixianjiang provide a new model for river fish protection. To make sure the complicated project works well, project plans, commission contracts, base line monitoring and techniques on artificial reproduction must be considered early. Last, fishery conservation should be considered alongside location development.

  6. 75 FR 28001 - Ken Willis; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ..., licensee for the Fire Mountain Lodge Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission's regulations thereunder. The Fire Mountain Lodge..., notice is hereby given that Ken Willis is authorized to continue operation of the Fire Mountain Lodge...

  7. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cada, Glenn F; Schweizer, Peter E

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through themore » turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al

  8. From Milk-Medicine To Public (Re)Education Programs: An Examination Of Anishinabek Mothers' Responses To Hydroelectric Flooding In The Treaty #3 District, 1900-1975.

    PubMed

    Luby, Brittany

    2015-01-01

    This paper explores how Anishinabek women managed their households during the hydroelectric boom of the 1950s and provides new insight into flooding impact analyses. To date, historians have sought to understand how hydroelectric development compromised "subsistence" living. Research has addressed declining fish and game populations and the corresponding decline in male employment. But, what do these trends mean once the nets and traps have been emptied? By focusing on the family home, we discover that hydroelectric power generation on the Winnipeg River disrupted the environment's ability to provide resources necessary to maintain women's reproductive health (especially breast milk). Food shortages caused by hydroelectric development in the postwar era compromised Anishinabek women's ability to raise their children in accordance with cultural expectations. What emerges from this analysis is a new lens through which to theorize the voluntary enrolment of Anishinabek children in residential schools in northwestern Ontario.

  9. What is the real price of hydroelectric production on the Senegal River?

    NASA Astrophysics Data System (ADS)

    Raso, Luciano; Bader, Jean-Claude; Malaterre, Pierre-Olivier

    2014-05-01

    Manantali is an annual reservoir on the Senegal River, located in Mali and serving Senegal and Mauritania. The reservoir is used to regulate the flow for hydroelectric production, in the face of the extremely variable seasonal climate of the region. Manantali has been operative for about 10 years now, exceeding the planned production capacity. The economic benefit comes at a price. Before the dam's construction, the annual flood was the basis of flood recession agriculture, traditionally practiced by the local population. Hydroelectric production requires a more regular flow; therefore flow peaks that used to create the flood are now dumped in the reservoir. Floods are reduced because the current reservoir management privileges hydroelectric production to flood recession agriculture. Moreover, the local water authority is evaluating the construction of 6 more reservoirs, which will enhance even further the controllability of the river flow. This study assesses the externalities of energy production for the agricultural production, quantifying the reduction of flooded surface when energy production is maximized, or alternatively, the loss energy production to maintain a minimum sustainable flood. In addition, we examine the system reliability against extreme events, and how a better use of hydrological information can improve the present reservoir management, in order to find a win-win solution. In this study we employ Stochastic Dual Dynamic Programming (SDDP) methodology. SDDP is a leaner version of Stochastic Dynamic Programming (SDP). SDDP does not suffer of the "curse of dimensionality", and therefore it can be applied to larger systems. In this application we include in the model: i) A semi-distributed hydrological model, ii) the reservoir, iii) the hydraulic routing process within the catchment and from the reservoir to the floodplain.

  10. H.R. 944: A Bill to provide rules regarding the payment by certain political subdivisions in the State of Montana of charges imposed by the United States with respect to a hydroelectric project located in Granite and Deer Lodge Counties, Montana. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-31

    This legislation grants a 5 year waiver on the payment of fees for the use of lands for the operating and maintaining of a hydroelectric development licensed by the Federal Energy Regulatory Commission, to any political subdivision of the state of Montana which takes the license, for FERC project 1473. Following the 5 year period the licensee would be required to pay the lesser of $20,000 or the annual charge for the use of the land imposed by any department or agency of the Federal Government.

  11. Short-term cascaded hydroelectric system scheduling based on chaotic particle swarm optimization using improved logistic map

    NASA Astrophysics Data System (ADS)

    He, Yaoyao; Yang, Shanlin; Xu, Qifa

    2013-07-01

    In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.

  12. Hydropower Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government inmore » planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.« less

  13. Downstream effects of a hydroelectric reservoir on aquatic plant assemblages.

    PubMed

    Bernez, Ivan; Haury, Jacques; Ferreira, Maria Teresa

    2002-03-16

    Macrophytes were studied downstream of the Rophémel hydroelectric dam on the River Rance (Côtes d'Armor Department, western France) to assess the effects of hydroelectric functioning on river macrophyte communities. We studied ten representative sections of the hydro-peaking channel on five occasions in 1995 and 1996, on a 15-km stretch of river. Floristic surveys were carried out on sections 50 m in length, and genera of macroalgae, species of bryophyta, hydrophytes, and emergent rhizophytes were identified. For the aquatic bryophytes and spermatophytes section of our study, we compared our results with 19th century floristic surveys, before the dam was built. During the vegetative growth period, the hydro-peaking frequency was low. The plant richness was highest near the dam. The macrophyte communities were highly modified according to the distance to the dam. The frequency and magnitude of hydro-peaking was related to the aquatic macrophyte richness in an Intermediate Disturbance Hypothesis position. However, the results of the eco-historical comparison with 19th century floristic surveys point to the original nature of the flora found at the site. Some floral patterns, seen during both periods and at an interval of 133 years, were indicative of the ubiquity of the aquatic flora and of the plants" adaptability. This demonstrates the importance of taking river basin history into account in such biological surveys.

  14. 77 FR 59389 - Hawks Nest Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    .... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...

  15. Malheur River Wildlife Mitigation Project, Annual Report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul

    Hydropower development within the Columbia and Snake River Basins has significantly affected riparian, riverine, and adjacent upland habitats and the fish and wildlife species dependent upon them. Hydroelectric dams played a major role in the extinction or major loss of both anadromous and resident salmonid populations and altered instream and adjacent upland habitats, water quality, and riparian/riverine function. Hydroelectric facility construction and inundation directly affected fish and wildlife species and habitats. Secondary and tertiary impacts including road construction, urban development, irrigation, and conversion of native habitats to agriculture, due in part to the availability of irrigation water, continue to affectmore » wildlife and fish populations throughout the Columbia and Snake River Basins. Fluctuating water levels resulting from facility operations have created exposed sand, cobble, and/or rock zones. These zones are generally devoid of vegetation with little opportunity to re-establish riparian plant communities. To address the habitat and wildlife losses, the United States Congress in 1980 passed the Pacific Northwest Electric Power Planning and Conservation Act (Act) (P.L. 96-501), which authorized the states of Idaho, Montana, Oregon, and Washington to create the Northwest Power Planning Council (Council). The Act directed the Council to prepare a program in conjunction with federal, state, and tribal wildlife resource authorities to protect, mitigate, and enhance fish and wildlife species affected by the construction, inundation and operation of hydroelectric dams in the Columbia River Basin (NPPC 2000). Under the Columbia Basin Fish and Wildlife Program (Program), the region's fish and wildlife agencies, tribes, non-government organizations (NGOs), and the public propose fish and wildlife projects that address wildlife and fish losses resulting from dam construction and subsequent inundation. As directed by the Council, project

  16. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    NASA Astrophysics Data System (ADS)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  17. Projects, Products and Services: Celebrating 75 Years of Excellence

    DTIC Science & Technology

    2009-01-01

    own war against this unyielding force of nature . The 1943 spring thaw caused eight of the Missouri’s tributaries to spill over their banks. The main...generating hydroelectricity and con- tained hydraulically-placed earthfill. Therefore, the project naturally divided itself into the dam, the... natural channel and divert its water through the newly built intake structure and tunnels. This was the first use of the hydraulic placement method

  18. [Analysis of the social and health impacts of large hydroelectric plants: lessons for a sustainable energy management].

    PubMed

    de Queiroz, Adriana Renata Sathler; Motta-Veiga, Marcelo

    2012-06-01

    The main objective of this study was to analyze the social and health impacts resulting from the construction of the Tucuruí (Pará, Brazil) and James Bay (Quebec, Canada) Hydroelectric Plants. The comparative method study used in analysis of the literature review revealed lessons to be learned from the national and international experience in order to ensure sustainable management of future major energy projects in Brazil. In this study, a successive negative domino effect was observed in terms of social impacts on jobs, income, sanitation, and culture, all with associated health problems. These included stress, nutritional and psychosocial disturbances, cardiopathies, as well as respiratory and digestive problems. The actions seeking to mitigate the effects of these negative impacts were slow to be implemented. Moreover, even though three decades have elapsed, these actions proved inefficient to resolve all the health and socio-environmental problems caused.

  19. Total mercury and methylmercury levels in fish from hydroelectric reservoirs in Tanzania.

    PubMed

    Ikingura, J R; Akagi, H

    2003-03-20

    Total mercury (THg) and methylmercury (MeHg) levels have been determined in fish species representing various tropic levels in four major hydroelectric reservoirs (Mtera, Kidatu, Hale-Pangani, Nyumba ya Mungu) located in two distinct geographical areas in Tanzania. The Mtera and Kidatu reservoirs are located along the Great Ruaha River drainage basin in the southern central part of the country while the other reservoirs are located within the Pangani River basin in the north eastern part of Tanzania. Fish mercury levels ranged from 5 to 143 microg/kg (mean 40 microg/kg wet weight) in the Mtera Reservoir, and from 7 to 119 microg/kg (mean 21 microg/kg) in the Kidatu Reservoir downstream of the Great Ruaha River. The lowest THg levels, in the range 1-10 microg/kg (mean 5 microg/kg), were found in fish from the Nyumba ya Mungu (NyM) Reservoir, which is one of the oldest reservoirs in the country. Fish mercury levels in the Pangani and Hale mini-reservoirs, downstream of the NyM Reservoir, were in the order of 3-263 microg/kg, with an average level of 21 microg/kg. These THg levels are among the lowest to be reported in freshwater fish from hydroelectric reservoirs. Approximately 56-100% of the total mercury in the fish was methylmercury. Herbivorous fish species contained lower THg levels than the piscivorous species; this was consistent with similar findings in other fish studies. In general the fish from the Tanzanian reservoirs contained very low mercury concentrations, and differed markedly from fish in hydroelectric reservoirs of similar age in temperate and other regions, which are reported to contain elevated mercury concentrations. The low levels of mercury in the fish correlated with low background concentrations of THg in sediment and flooded soil (mean 2-8 microg/kg dry weight) in the reservoir surroundings. This suggested a relatively clean reservoir environment that has not been significantly impacted by mercury contamination from natural or anthropogenic

  20. Rapid green synthesis of ZnO nanoparticles using a hydroelectric cell without an electrolyte

    NASA Astrophysics Data System (ADS)

    Shah, Jyoti; Kumar Kotnala, Ravinder

    2017-09-01

    In this study, zinc oxide (ZnO) nanoparticles were synthesized using a novel environmentally friendly hydroelectric cell without an electrolyte or external current source. The hydroelectric cell comprised a nanoporous Li substituted magnesium ferrite pellet in contact with two electrodes, with zinc as the anode and silver as an inert cathode. The surface unsaturated cations and oxygen vacancies in the nanoporous ferrite dissociated water molecules into hydronium and hydroxide ions when the hydroelectric cell was dipped into deionized water. Hydroxide ions migrated toward the zinc electrode to form zinc hydroxide and the hydronium ions were evolved as H2 gas at the silver electrode. The zinc hydroxide collected as anode mud was converted into ZnO nanoparticles by heating at 250 °C. Structural analysis using Raman spectroscopy indicated the good crystallinity of the ZnO nanoparticles according to the presence of a high intensity E2-(high) mode. The nanoparticle size distribution was 5-20 nm according to high resolution transmission electron microscopy. An indirect band gap of 2.75 eV was determined based on the Tauc plot, which indicated the existence of an interstitial cation level in ZnO. Near band edge and blue emissions were detected in photoluminescence spectral studies. The blue emissions obtained from the ZnO nanoparticles could potentially have applications in blue lasers and LEDs. The ZnO nanoparticles synthesized using this method had a high dielectric constant value of 5 at a frequency of 1 MHz, which could be useful for fabricating nano-oscillators. This facile, clean, and cost-effective method obtained a significant yield of 0.017 g for ZnO nanoparticles without applying an external current source.

  1. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  2. 75 FR 6020 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... feasibility of the George W. Andrews Hydroelectric Project located at the existing George W. Andrews Lock and.... Andrews Lock and Dam Hydroelectric Project by Brookfield Power (Project No. 13077-000, filed on November... have an average annual generation of 89 gigawatt-hours. The proposed George W. Andrews Hydroelectric...

  3. 76 FR 37108 - Inside Passage Electric Cooperative; Notice of Declaration of Intention and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Supply Creek Hydroelectric Project. f. Location: The proposed Water Supply Creek Hydroelectric Project will be located on Water Supply Creek, near the town of Hoonah on Chichagof Island, Alaska, affecting T... proposed run-of-river Water Supply Creek Hydroelectric Project will consist of: (1) A proposed 8-foot- high...

  4. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    NASA Astrophysics Data System (ADS)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  5. Prediction of Francis Turbine Prototype Part Load Pressure and Output Power Fluctuations with Hydroelectric Model

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.

    2017-04-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).

  6. Recovery Act. Tapoco project. Cheoah upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tran, Paul

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  7. 78 FR 45918 - Application for Presidential Permit; Soule River Hydroelectric Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Hydro. Soule Hydro proposes to construct and operate a high-voltage alternating current (HVAC... 8-mile long, 138 kilovolt (kV) HVAC 3-phase submarine cable that would be laid on the floor of... whether the proposed project would adversely affect the operation of the U.S. electric power supply system...

  8. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    PubMed

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. © 2012 The Society for Vector Ecology.

  9. Habitat Evaluation Procedure (HEP) Report for the Pend Oreille Wetlands Wildlife Project, Technical Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holmes, Darren

    The Habitat Evaluation Procedure (HEP), developed in 1980 by the U.S. Fish and Wildlife Service (USFWS 1980a, USFWS 1980b), uses a habitat/species based approach to assessing project impacts, and is a convenient tool to document the predicted effects of proposed management actions. The Northwest Power Planning Council (NPPC) endorsed the use of HEP in its Columbia River Basin Fish and Wildlife Program to evaluate wildlife benefits and impacts associated with the development and operation of the federal Columbia River Basin hydroelectric system (NPPC 1994). The Albeni Falls Interagency Work Group (AFIWG) used HEP in 1987 to evaluate wildlife habitat lossesmore » attributed to the Albeni Falls hydroelectric facility (Martin et al. 1988). In 1992, the AFIWG (Idaho Department of Fish and Game; Kalispel, Coeur d'Alene, and Kootenai Tribes) began implementing activities to mitigate these losses. Implementation activities include protecting, restoring and enhancing wildlife habitat. HEPs are used extensively within the NPPC's Columbia River Basin Fish and Wildlife Program. Wildlife managers use HEP to determine habitat lost from the construction of the federal hydroelectric projects and habitat gained through NPPC mitigation program. Habitat Suitability Index (HSI) models for each of the seven target species are used to determine habitat quality and quantity losses for representative habitat cover types for this project. Target species include Bald Eagle, black-capped chickadee, Canada goose, mallard, muskrat, white-tailed deer and yellow warbler. In 2002, a HEP team determined the habitat condition of the 436-acre Pend Oreille Wetlands Wildlife Project (Figure 1). The HEP team consisted of the following members and agencies: Roy Finley, Kalispel Natural Resource Department (KNRD); Neil Lockwood, KNRD; Brian Merson, KNRD; Sonny Finley, KNRD; Darren Holmes, KNRD; Anna, Washington Dept. of Fish and Game (WDFW); and Scott, WDFW. Baseline Habitat Units (HU) will be credited

  10. Locked on course: Hydro-Quebec`s commitment to mega-projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro

    1997-01-01

    Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier successmore » with large projects, (2) its engineering culture`s norms for consistency, and (3) its role in the government`s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects.« less

  11. Habitat Evaluation Procedure (HEP) Report for the Pend Oreille Wetlands Wildlife II Project, Technical Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holmes, Darren

    The Habitat Evaluation Procedure (HEP), developed in 1980 by the U.S. Fish and Wildlife Service (USFWS 1980a, USFWS 1980b), uses a habitat/species based approach to assessing project impacts, and is a convenient tool to document the predicted effects of proposed management actions. The Northwest Power Planning Council (NPPC) endorsed the use of HEP in its Columbia River Basin Fish and Wildlife Program to evaluate wildlife benefits and impacts associated with the development and operation of the federal Columbia River Basin hydroelectric system (NPPC 1994). The Albeni Falls Interagency Work Group (AFIWG) used HEP in 1987 to evaluate wildlife habitat lossesmore » attributed to the Albeni Falls hydroelectric facility (Martin et al. 1988). In 1992, the AFIWG (Idaho Department of Fish and Game; Kalispel, Coeur d'Alene, and Kootenai Tribes) began implementing activities to mitigate these losses. Implementation activities include protecting, restoring and enhancing wildlife habitat. HEPs are used extensively within the NPPC's Columbia River Basin Fish and Wildlife Program. Wildlife managers use HEP to determine habitat lost from the construction of the federal hydroelectric projects and habitat gained through NPPC mitigation program. Habitat Suitability Index (HSI) models for each of the seven target species are used to determine habitat quality and quantity losses for representative habitat cover types for this project. Target species include Bald Eagle, black-capped chickadee, Canada goose, mallard, muskrat, white-tailed deer and yellow warbler. In 2002, a HEP team determined the habitat condition of the 164-acre Pend Oreille Wetlands Wildlife II Project (Figure 1). The HEP team consisted of the following members and agencies: Roy Finley, Kalispel Natural Resource Department (KNRD); Neil Lockwood, KNRD; Brian Merson, KNRD; Sonny Finley, KNRD; Darren Holmes, KNRD; Anna, Washington Dept. of Fish and Game (WDFW); and Scott, WDFW. Baseline Habitat Units (HU) will be

  12. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... period for accepting written proposals detailed in the Notice of Intent to Accept Proposals, Select One...

  13. SMOOTHING THE PEAKS: GRIDSHARE SMART GRID TECHNOLOGY TO REDUCE BROWNOUTS ON MICRO-HYDROELECTRIC MINI-GRIDS IN BHUTAN

    EPA Science Inventory

    Village scale micro-hydroelectric systems in countries like Bhutan, Thailand, Peru, Laos and China provide renewable electricity to thousands of self-reliant communities in remote locations. While promising, many of these systems are plagued by a common problem: brownouts occu...

  14. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    PubMed

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH 4 , NO 3 , PO 4 , with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO 4 3- values during the different hydrological phases.

  15. 50 CFR 223.301 - Special rules-marine and anadromous fishes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... their behalf for the purpose of monitoring and evaluating the Opal Springs Hydroelectric Project (FERC... maintenance of the Opal Springs Hydroelectric Project (FERC Project No. 5891) as administered under a license...

  16. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  17. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  18. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  19. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  20. 18 CFR 4.101 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...

  1. Can Fish Morphological Characteristics be Used to Re-design Hydroelectric Turbines?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cada, G. F.; Richmond, Marshall C.

    2011-07-19

    Safe fish passage affects not only migratory species, but also populations of resident fish by altering biomass, biodiversity, and gene flow. Consequently, it is important to estimate turbine passage survival of a wide range of susceptible fish. Although fish-friendly turbines show promise for reducing turbine passage mortality, experimental data on their beneficial effects are limited to only a few species, mainly salmon and trout. For thousands of untested species and sizes of fish, the particular causes of turbine passage mortality and the benefits of fish-friendly turbine designs remain unknown. It is not feasible to measure the turbine-passage survival of everymore » species of fish in every hydroelectric turbine design. We are attempting to predict fish mortality based on an improved understanding of turbine-passage stresses (pressure, shear stress, turbulence, strike) and information about the morphological, behavioral, and physiological characteristics of different fish taxa that make them susceptible to the stresses. Computational fluid dynamics and blade strike models of the turbine environment are re-examined in light of laboratory and field studies of fish passage effects. Comparisons of model-predicted stresses to measured injuries and mortalities will help identify fish survival thresholds and the aspects of turbines that are most in need of re-design. The coupled model and fish morphology evaluations will enable us to make predictions of turbine-passage survival among untested fish species, for both conventional and advanced turbines, and to guide the design of hydroelectric turbines to improve fish passage survival.« less

  2. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlifemore » species incurring positive impacts attributable to the project were identified.« less

  3. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    .... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  4. 77 FR 790 - Grant Lake Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13212-002] Grant Lake.... The proposed project would consist of: (1) Either (a) a 2-foot-high by 120-foot-long, concrete gravity... project reservoir, with a total storage capacity of 15,900 acre-feet and a water surface area of 1,790...

  5. 18 CFR 4.105 - Action on exemption applications.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...

  6. 18 CFR 4.105 - Action on exemption applications.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...

  7. 18 CFR 4.105 - Action on exemption applications.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...

  8. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... opportunity to purchase and/or market the power that would be generated by such development under a lease of... develop hydroelectric power at Granby Dam Outlet, and power purchasing and/or marketing considerations... Office (GP-2200), P.O. Box 36900, Billings, MT 59107-6900. Information related to Western's purchasing...

  9. Fish population genetic structure shaped by hydroelectric power plants in the upper Rhine catchment.

    PubMed

    Gouskov, Alexandre; Reyes, Marta; Wirthner-Bitterlin, Lisa; Vorburger, Christoph

    2016-02-01

    The Rhine catchment in Switzerland has been transformed by a chain of hydroelectric power stations. We addressed the impact of fragmentation on the genetic structure of fish populations by focusing on the European chub (Squalius cephalus). This fish species is not stocked and copes well with altered habitats, enabling an assessment of the effects of fragmentation per se. Using microsatellites, we genotyped 2133 chub from 47 sites within the catchment fragmented by 37 hydroelectric power stations, two weirs and the Rhine Falls. The shallow genetic population structure reflected drainage topology and was affected significantly by barriers to migration. The effect of power stations equipped with fishpasses on genetic differentiation was detectable, albeit weaker than that of man-made barriers without fishpasses. The Rhine Falls as the only long-standing natural obstacle (formed 14 000 to 17 000 years ago) also had a strong effect. Man-made barriers also exacerbated the upstream decrease in allelic diversity in the catchment, particularly when lacking fishpasses. Thus, existing fishpasses do have the desired effect of mitigating fragmentation, but barriers still reduce population connectivity in a fish that traverses fishpasses better than many other species. Less mobile species are likely to be affected more severely.

  10. A critical view on the eco-friendliness of small hydroelectric installations.

    PubMed

    Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A

    2014-05-15

    Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.

  11. Establishing baseline biodiversity data prior to hydroelectric dam construction to monitoring impacts to bats in the Brazilian Amazon.

    PubMed

    Bobrowiec, Paulo Estefano D; Tavares, Valéria da Cunha

    2017-01-01

    The modification of Amazonian rivers by the construction of megaprojects of hydroelectric dams has widely increased over the last decade. Robust monitoring programs have been rarely conducted prior to the establishment of dams to measure to what extent the fauna, and its associated habitats may be affected by upcoming impacts. Using bats as models, we performed analyses throughout the area under the influence of the Santo Antônio hydroelectric dam, Southwestern Brazilian Amazonia before its construction to estimate how the fauna and its associated habitats would be affected by the upcoming impacts. We surveyed bats in 49 plots distributed along the areas going to be inundated by the dam and those remaining dry. As predictors for the species distribution, we tested the variables of vegetation structure and topography. Species composition largely differed between the dry plots and the plots located in areas that will be flooded, and this was strongly associated with the variables of forest basal area and elevation. Vegetation-related variables also had strong influence on the guilds distribution. The flooding of lower elevations areas is expected to negatively affect the species number and abundance of frugivorous species. In contrast, it is likely that animalivores will be less vulnerable to dam-induced flooding, since they were abundant in the areas not expect to be inundated. We urge for the implementation of studies to predict impacts caused by large hydroelectric dams, including tests of the influence of the local conditions that shape diversity to avoid massive losses of the biota, and to build preventive monitoring and management actions.

  12. Establishing baseline biodiversity data prior to hydroelectric dam construction to monitoring impacts to bats in the Brazilian Amazon

    PubMed Central

    Tavares, Valéria da Cunha

    2017-01-01

    The modification of Amazonian rivers by the construction of megaprojects of hydroelectric dams has widely increased over the last decade. Robust monitoring programs have been rarely conducted prior to the establishment of dams to measure to what extent the fauna, and its associated habitats may be affected by upcoming impacts. Using bats as models, we performed analyses throughout the area under the influence of the Santo Antônio hydroelectric dam, Southwestern Brazilian Amazonia before its construction to estimate how the fauna and its associated habitats would be affected by the upcoming impacts. We surveyed bats in 49 plots distributed along the areas going to be inundated by the dam and those remaining dry. As predictors for the species distribution, we tested the variables of vegetation structure and topography. Species composition largely differed between the dry plots and the plots located in areas that will be flooded, and this was strongly associated with the variables of forest basal area and elevation. Vegetation-related variables also had strong influence on the guilds distribution. The flooding of lower elevations areas is expected to negatively affect the species number and abundance of frugivorous species. In contrast, it is likely that animalivores will be less vulnerable to dam-induced flooding, since they were abundant in the areas not expect to be inundated. We urge for the implementation of studies to predict impacts caused by large hydroelectric dams, including tests of the influence of the local conditions that shape diversity to avoid massive losses of the biota, and to build preventive monitoring and management actions. PMID:28886029

  13. 18 CFR 4.93 - Action on exemption applications.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...

  14. 18 CFR 4.93 - Action on exemption applications.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...

  15. 18 CFR 4.93 - Action on exemption applications.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...

  16. 18 CFR 4.93 - Action on exemption applications.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...

  17. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysismore » and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)« less

  18. Study of the Time Response of a Simulated Hydroelectric System

    NASA Astrophysics Data System (ADS)

    Simani, S.; Alvisi, S.; Venturini, M.

    2014-12-01

    This paper addresses the design of an advanced control strategy for a typical hydroelectric dynamic process, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solution, the proposed methodology relies on an adaptive control designed by means of the on-line identification of the system model under monitoring. Extensive simulations and comparison with respect to a classic hydraulic turbine speed PID regulator show the effectiveness of the proposed modelling and control tools.

  19. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...

  20. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...

  1. 77 FR 13585 - Three Sisters Irrigation District; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ...: The proposed Three Sisters Irrigation District Hydroelectric Project would be located on the north pipe of the Three Sisters Irrigation District's Main Canal Pipeline in Deschutes County, Oregon. The... of Project: The Three Sisters Irrigation District Hydroelectric Project would consist of: (1) An...

  2. The blue water footprint of the world's artificial reservoirs for hydroelectricity, irrigation, residential and industrial water supply, flood protection, fishing and recreation

    NASA Astrophysics Data System (ADS)

    Hogeboom, Rick J.; Knook, Luuk; Hoekstra, Arjen Y.

    2018-03-01

    For centuries, humans have resorted to building dams to gain control over freshwater available for human consumption. Although dams and their reservoirs have made many important contributions to human development, they receive negative attention as well, because of the large amounts of water they can consume through evaporation. We estimate the blue water footprint of the world's artificial reservoirs and attribute it to the purposes hydroelectricity generation, irrigation water supply, residential and industrial water supply, flood protection, fishing and recreation, based on their economic value. We estimate that economic benefits from 2235 reservoirs included in this study amount to 265 × 109 US a year, with residential and industrial water supply and hydroelectricity generation as major contributors. The water footprint associated with these benefits is the sum of the water footprint of dam construction (<1% contribution) and evaporation from the reservoir's surface area, and globally adds up to 66 × 109 m3 y-1. The largest share of this water footprint (57%) is located in non-water scarce basins and only 1% in year-round scarce basins. The primary purposes of a reservoir change with increasing water scarcity, from mainly hydroelectricity generation in non-scarce basins, to residential and industrial water supply, irrigation water supply and flood control in scarcer areas.

  3. Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground

    NASA Astrophysics Data System (ADS)

    Newman, Walter S.; Fairbridge, Rhodes W.

    This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sea-level regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of “Project NOAH”.

  4. 18 CFR 4.102 - Surrender of exemption.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...

  5. 18 CFR 4.102 - Surrender of exemption.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...

  6. 18 CFR 4.102 - Surrender of exemption.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...

  7. 18 CFR 4.103 - General provisions for case-specific exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...

  8. 18 CFR 4.102 - Surrender of exemption.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...

  9. 18 CFR 4.103 - General provisions for case-specific exemption.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...

  10. 18 CFR 4.103 - General provisions for case-specific exemption.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...

  11. 18 CFR 4.103 - General provisions for case-specific exemption.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...

  12. 18 CFR 4.103 - General provisions for case-specific exemption.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...

  13. Cytokine synthesis in occupational allergy to caddisflies in hydroelectric plant workers.

    PubMed

    Warrington, R J; Whitman, C; McPhillips Warrington, S

    2003-10-01

    Workers in hydroelectric plants appear to be readily sensitized to caddisfly allergens. This sensitization probably occurs de novo from occupational exposure. In some workers, sensitization occurs on a non-atopic background. Cytokine synthesis of IFN-gamma, IL-5 and IL-13 in atopic and non-atopic caddisfly-allergic workers was examined to determine if responses were similar or different. Peripheral blood mononuclear cells were isolated from atopic caddisfly-allergic workers, non-atopic caddisfly-allergic workers and non-atopic caddisfly-exposed but non-allergic workers. Stimulation with caddisfly antigens was carried out and synthesis of IFN-gamma, IL-5 and IL-13 was determined by sandwich ELISA. Both caddisfly-allergic and non-allergic subjects responded to stimulation with caddisfly extract. The response in non-atopic caddisfly-non-allergic subjects was TH1 predominant, while that in atopic caddisfly-allergic subjects was TH2 predominant. The response in non-atopic caddisfly-allergic subjects was between that of the atopic caddisfly-allergic workers and the non-atopic caddisfly-non-allergic workers and the trend was to a TH2 response. Work-related symptoms were similarly intermediate between the atopic caddisfly-allergic and non-atopic caddisfly-non-allergic group. Differences were significant for IFN-gamma/IL-5 ratios but not IFN-gamma/IL-13 ratios for atopic and non-atopic caddisfly-allergic individuals, compared to non-atopic caddisfly-non-allergic workers. However, a linear relationship existed between IFN-gamma synthesis and IL-5 and IL-13 synthesis in non-atopic caddisfly-allergic workers but not in atopic caddisfly-allergic subjects. Caddisfly allergy in hydroelectric workers may be a useful model for the development of allergy to a previously unencountered allergen, and points to some interesting differences between atopic and non-atopic subjects who become sensitized to environmental allergens. Copyright 2003 S. Karger AG, Basel

  14. 18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...

  15. 18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...

  16. 18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...

  17. 18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...

  18. 18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...

  19. 78 FR 41057 - Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Public Meetings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105-036 (Toledo Bend Project). The draft EIS documents the views of governmental...

  20. 78 FR 37216 - Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... Environmental Impact Statement for the Toledo Bend Hydroelectric Project In accordance with the National... Office of Energy Projects has reviewed the application for license for the Toledo Bend Hydroelectric... the Toledo Bend Project. The draft EIS documents the views of governmental agencies, non- governmental...

  1. 78 FR 41056 - Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... applications for original licenses for the Red River Lock and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757- 004), and Red... be located on the Red River in Louisiana. The Lock and Dam No. 5 Project would be located in Bossier...

  2. Efforts to reduce mortality to hydroelectric turbine-passed fish: locating and quantifying damaging shear stresses.

    PubMed

    Cada, Glenn; Loar, James; Garrison, Laura; Fisher, Richard; Neitzel, Duane

    2006-06-01

    Severe fluid forces are believed to be a source of injury and mortality to fish that pass through hydroelectric turbines. A process is described by which laboratory bioassays, computational fluid dynamics models, and field studies can be integrated to evaluate the significance of fluid shear stresses that occur in a turbine. Areas containing potentially lethal shear stresses were identified near the stay vanes and wicket gates, runner, and in the draft tube of a large Kaplan turbine. However, under typical operating conditions, computational models estimated that these dangerous areas comprise less than 2% of the flow path through the modeled turbine. The predicted volumes of the damaging shear stress zones did not correlate well with observed fish mortality at a field installation of this turbine, which ranged from less than 1% to nearly 12%. Possible reasons for the poor correlation are discussed. Computational modeling is necessary to develop an understanding of the role of particular fish injury mechanisms, to compare their effects with those of other sources of injury, and to minimize the trial and error previously needed to mitigate those effects. The process we describe is being used to modify the design of hydroelectric turbines to improve fish passage survival.

  3. 75 FR 46918 - Gresham Municipal Utilities; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On the Red River, in.... Description of Request: The licensee proposes to amend the license for the Upper Red Lake Dam Hydroelectric... Project No. 2464), which is located immediately downstream from the Upper Red Lake Dam Project; (2) the...

  4. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Gold, Assistant Regional Director, Upper Colorado Region. [FR Doc. 2010-13149 Filed 6-1-10; 8:45 am..., Dallas Creek Project, Colorado AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of intent to..., Area Manager, Western Colorado Area Office, Bureau of Reclamation, 2764 Compass Drive, Suite 106, Grand...

  5. Benchmarking of Advanced Control Strategies for a Simulated Hydroelectric System

    NASA Astrophysics Data System (ADS)

    Finotti, S.; Simani, S.; Alvisi, S.; Venturini, M.

    2017-01-01

    This paper analyses and develops the design of advanced control strategies for a typical hydroelectric plant during unsteady conditions, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solutions addressed in this work, the proposed methodologies rely on data-driven and model-based approaches applied to the system under monitoring. Extensive simulations and comparisons serve to determine the best solution for the development of the most effective, robust and reliable control tool when applied to the considered hydraulic system.

  6. [The mosquito fauna (Diptera: Culicidae) of the environs of the Sayan-Shushenskoe hydroelectric power station].

    PubMed

    Gornostaeva, R M

    1999-01-01

    Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).

  7. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...

  8. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...

  9. 18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...

  10. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant.

    PubMed

    Acakpovi, Amevi; Dzamikumah, Lucky

    2016-12-01

    Occupational risk management is known as a catalyst in generating superior returns for all stakeholders on a sustainable basis. A number of companies in Ghana implemented health and safety measures adopted from international companies to ensure the safety of their employees. However, there exist great threats to employees' safety in these companies. The purpose of this paper is to investigate the level of compliance of Occupational Health and Safety management systems and standards set by international and local legislation in power producing companies in Ghana. The methodology is conducted by administering questionnaires and in-depth interviews as measuring instruments. A random sampling technique was applied to 60 respondents; only 50 respondents returned their responses. The questionnaire was developed from a literature review and contained questions and items relevant to the initial research problem. A factor analysis was also carried out to investigate the influence of some variables on safety in general. Results showed that the significant factors that influence the safety of employees at the hydroelectric power plant stations are: lack of training and supervision, non-observance of safe work procedures, lack of management commitment, and lack of periodical check on machine operations. The study pointed out the safety loopholes and therefore helped improve the health and safety measures of employees in the selected company by providing effective recommendations. The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  11. Modelling CO2 emissions from water surface of a boreal hydroelectric reservoir.

    PubMed

    Wang, Weifeng; Roulet, Nigel T; Kim, Youngil; Strachan, Ian B; Del Giorgio, Paul; Prairie, Yves T; Tremblay, Alain

    2018-01-15

    To quantify CO 2 emissions from water surface of a reservoir that was shaped by flooding the boreal landscape, we developed a daily time-step reservoir biogeochemistry model. We calibrated the model using the measured concentrations of dissolved organic and inorganic carbon (C) in a young boreal hydroelectric reservoir, Eastmain-1 (EM-1), in northern Quebec, Canada. We validated the model against observed CO 2 fluxes from an eddy covariance tower in the middle of EM-1. The model predicted the variability of CO 2 emissions reasonably well compared to the observations (root mean square error: 0.4-1.3gCm -2 day -1 , revised Willmott index: 0.16-0.55). In particular, we demonstrated that the annual reservoir surface effluxes were initially high, steeply declined in the first three years, and then steadily decreased to ~115gCm -2 yr -1 with increasing reservoir age over the estimated "engineering" reservoir lifetime (i.e., 100years). Sensitivity analyses revealed that increasing air temperature stimulated CO 2 emissions by enhancing CO 2 production in the water column and sediment, and extending the duration of open water period over which emissions occur. Increasing the amount of terrestrial organic C flooded can enhance benthic CO 2 fluxes and CO 2 emissions from the reservoir water surface, but the effects were not significant over the simulation period. The model is useful for the understanding of the mechanism of C dynamics in reservoirs and could be used to assist the hydro-power industry and others interested in the role of boreal hydroelectric reservoirs as sources of greenhouse gas emissions. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Extrapolation of dynamic load behaviour on hydroelectric turbine blades with cyclostationary modelling

    NASA Astrophysics Data System (ADS)

    Poirier, Marc; Gagnon, Martin; Tahan, Antoine; Coutu, André; Chamberland-lauzon, Joël

    2017-01-01

    In this paper, we present the application of cyclostationary modelling for the extrapolation of short stationary load strain samples measured in situ on hydraulic turbine blades. Long periods of measurements allow for a wide range of fluctuations representative of long-term reality to be considered. However, sampling over short periods limits the dynamic strain fluctuations available for analysis. The purpose of the technique presented here is therefore to generate a representative signal containing proper long term characteristics and expected spectrum starting with a much shorter signal period. The final objective is to obtain a strain history that can be used to estimate long-term fatigue behaviour of hydroelectric turbine runners.

  13. 78 FR 38307 - Gresham Municipal Utilities; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    .... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...

  14. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    PubMed

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  15. Geophysical Investigation using Two Dimensional Electrical Resistivity Tomography method to delineate Subsurface Geological Structures at Dudhkoshi-II (230 MW) Hydroelectric Project, Solukhumbu District, Eastern Nepal

    NASA Astrophysics Data System (ADS)

    Ghimire, H.; Bhusal, U. C.; Khatiwada, B.; Pandey, D.

    2017-12-01

    Geophysical investigation using two dimensional electrical resistivity tomography (2D-ERT) method plays a significant role in determining the subsurface resistivity distribution by making measurement on the ground surface. This method was carried out at Dudhkoshi-II (230 MW) Hydroelectric Project, lies on Lesser Himalayan region of the Eastern Nepal to delineate the nature of the subsurface geology to assess its suitability for the construction of dam, desanding basin and powerhouse. The main objective of the proposed study consists of mapping vertical as well as horizontal variations of electrical resistivity to enable detection of the boundaries between unconsolidated materials and rocks of the different resistivity, possible geologic structures, such as possible presence of faults, fractures, and voids in intake and powerhouse area. For this purpose, the (WDJD-4 Multi-function Digital DC Resistivity/IP) equipment was used with Wenner array (60 electrodes). To fulfill these objectives of the study, the site area was mapped by Nine ERT profiles with different profile length and space between electrodes was 5 m. The depth of the investigation was 50 m. The acquired data were inverted to tomogram sections using tomographic inversion with RES2DINV commercial software. The Tomography sections show that the subsurface is classified into distinct geo-electric layers of dry unconsolidated overburden, saturated overburden, fractured rock and fresh bedrock of phyllites with quartzite and gneiss with different resistivity values. There were no voids and faults in the study area. Thickness of overburden at different region found to be different. Most of the survey area has bedrock of phyllites with quartzite; gneiss is also present in some location at intake area. Bedrock is found at the varies depth of 5-8 m at dam axis, 20-32 m at desanding basin and 3-10 m at powerhouse area. These results are confirmed and verified by using several boreholes data were drilled on the

  16. Fish mercury increase in Lago Manso, a new hydroelectric reservoir in tropical Brazil.

    PubMed

    Hylander, Lars D; Gröhn, Janina; Tropp, Magdalena; Vikström, Anna; Wolpher, Henriette; de Castro E Silva, Edinaldo; Meili, Markus; Oliveira, Lázaro J

    2006-10-01

    It has been frequently demonstrated that mercury (Hg) concentrations in fish rise in newly constructed hydroelectric reservoirs in the Northern Hemisphere. In the present work, we studied whether similar effects take place also in a tropical upland reservoir during impoundment and discuss possible causes and implications. Total Hg concentrations in fish and several soil and water parameters were determined before and after flooding at Rio Manso hydroelectric power plant in western Brazil. The Hg concentrations in soil and sediment were within the background levels in the region (22-35 ng g(-1) dry weight). There was a strong positive correlation between Hg and carbon and sulphur in sediment. Predatory fish had total Hg concentrations ranging between 70 and 210 ng g(-1) f.w. 7 years before flooding and between 72 and 755 ng g(-1) f.w. during flooding, but increased to between 216 and 938 ng g(-1) f.w. in the piscivorous and carnivorous species Pseudoplatystoma fasciatum, cachara, and Salminus brasiliensis, dourado, 3 years after flooding. At the same time, concentrations of organic carbon in the water increased and oxygen concentrations decreased, indicating increased decomposition and anoxia as contributing to the increased Hg concentrations in fish. The present fish Hg concentrations in commonly consumed piscivorous species are a threat to the health of the population dependent on fishing in the dam and downstream river for sustenance. Mercury exposure can be reduced by following fish consumption recommendations until fish Hg concentrations decrease to a safe level.

  17. [Space-time water monitoring system at the Iriklinsk hydroelectric power station].

    PubMed

    Deriabin, D G; Poliakov, E G; Priakhina, A A; Karimov, I F

    2002-01-01

    The Microbiosensor B 17677 F test system was applied to make a space-time monitoring of the biotoxicity of water used for production and everyday purposes at the Iriklinsk hydroelectric power station (IHEPS) and to identify the leading causes determining the biotoxicity of tested samples. There were seasonal variations in the biotoxicity with the maximum in spring and with minimum in winter and spring and a relationship of the spring rise in the biotoxicity to water pH changes. There was also an association of the certain values of the biotoxicity of industrial water with the concentration of petroleum products that are major pollutants at the IHEPS. The datum points that characterize the maximum level of technogenic exposure were identified.

  18. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    PubMed

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  19. Revolutionising landscapes: Hydroelectricity and the heavy industrialisation of society and environment in the Comte de Beauharnois, 1927--1948

    NASA Astrophysics Data System (ADS)

    Pelletier, Louis-Raphael

    This dissertation analyses the rapid industrialisation of the rural Comte de Beauharnois and the adjacent stretch of the Fleuve Saint-Laurent owing to the construction, between 1929 and 1948, of a gigantic canal for hydroelectricity production and navigation by an electricity corporation called the Beauharnois Light Heat and Power (BLH&P). Using principally the archives of the BLH&P---especially its complaints files and its rich photographic record---this thesis argues that this process exemplifies the finance capitalist reorganisation of the society and ecosystems of the Canadian province of Quebec from the 19th century to the Great Depression. In keeping with recent work in environmental history, the transformation of rural landscapes and a river for heavy industry is described as an important dimension of a revolution in modes of production. More specifically, I argue that, in the case under study, the finance-capitalist reorganisation of Quebec revolved around two central and explicit projects, one social and the other environmental: the grouping of most individuals in an industrial working class without control over the means of production and the reorganisation of rural landscapes into reservoirs of modern energy and industrial natural resources.

  20. CAD for small hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bishop, N.A. Jr.

    1994-04-01

    Over the past decade, computer-aided design (CAD) has become a practical and economical design tool. Today, specifying CAD hardware and software is relatively easy once you know what the design requirements are. But finding experienced CAD professionals is often more difficult. Most CAD users have only two or three years of design experience; more experienced design personnel are frequently not CAD literate. However, effective use of CAD can be the key to lowering design costs and improving design quality--a quest familiar to every manager and designer. By emphasizing computer-aided design literacy at all levels of the firm, a Canadian joint-venturemore » company that specializes in engineering small hydroelectric projects has cut costs, become more productive and improved design quality. This article describes how they did it.« less

  1. Change in Anopheles richness and composition in response to artificial flooding during the creation of the Jirau hydroelectric dam in Porto Velho, Brazil.

    PubMed

    Rodrigures, Moreno S; Batista, Elis P; Silva, Alexandre A; Costa, Fábio M; Neto, Verissimo A S; Gil, Luiz Herman S

    2017-02-22

    Anopheles mosquitoes are the only vectors of human malaria. Anopheles species use standing water as breeding sites. Human activities, like the creation of an artificial lake during the implementation of hydroelectric power plants, lead to changes in environmental characteristics and, therefore, may changes the species richness and composition of Anopheles mosquitoes. The aim of the present study was to verify whether or not there is an association between the artificial flooding resulting from the construction of the Jirau hydroelectric power plant, and the richness and composition of anophelines. Mosquitoes samples were obtained monthly from the Jirau hydroelectric power plant area located at Porto Velho, Rondônia State, using Human Landing Catch (06:00-10:00 PM). Mosquitoes collected were transported to Laboratório de Entomologia Médica FIOCRUZ-RO where they were identified until species using dichotomous key. A total of 6347 anophelines belonging to eight different species were collected. The anophelines species richness was significantly lower during the first flooding stage. Differences in anophelines species composition were found when comparing the first flooding stage with the other stages. Furthermore, the mean number of Anopheles darlingi, the main vector of malaria in the region, increases during the first and the third flooding stages. The continual monitoring of these vectors during the late operational phase may be useful in order to understand how anophelines will behave in this area.

  2. 77 FR 29626 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... Hydroelectric, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. The...

  3. Effects of the earthquake of March 27, 1964, on the Eklutna Hydroelectric Project, Anchorage, Alaska, with a section on television examination of earthquake damage to underground communication and electrical systems in Anchorage: Chapter A in The Alaska earthquake, March 27, 1964: effects on transportation, communications, and utilities

    USGS Publications Warehouse

    Logan, Malcolm H.; Burton, Lynn R.

    1967-01-01

    The March 27, 1964, Alaska earthquake and its associated aftershocks caused damage requiring several million dollars worth of repair to the Eklwtna Hydroelectric Project, 34 miles northeast of Anchorage. Electric service from the Eklutna powerplant was interrupted during the early phase of the March 27 earthquake, built was restored (intermittently) until May 9,1964, when the plant was closed for inspection and repair. Water for Eklutna project is transported from Eklutna Lake to the powerplant at tidewater on Knik Arm of Cook Inlet by an underwater intake connected to a 4.46-mile tunnel penstock. The primary damage caused by the earthquake was 1at the intake structure in Eklutna Lake. No damage to the power tunnel was observed. The piles-supported powerplant and appurtenant structures, Anchorage and Palmer substations, and the transmission lines suffered minor dammage. Most damage occurred to facilities constructed on un-consolidated sediments and overburden which densified and subsided during the earthquake. Structures built on bedrock experienced little or no damage. Underground communication and electrical systems in Anchorage were examined with a small-diameter television camera to locate damaged areas requiring repair. Most of the damage was concentrated at or near valley slopes. Those parts of the systems within the major slide areas of the city were destroyed.

  4. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared anmore » environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.« less

  5. 77 FR 50681 - Pacific Gas and Electric Company; Notice of Receipt of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2130-066] Pacific Gas and Electric Company; Notice of Receipt of Application Take notice that the following hydroelectric application.... Applicant: Pacific Gas and Electric Company (PG&E). e. Name of Project: Spring Gap--Stanislaus Hydroelectric...

  6. Downstream impacts of a Central Amazonian hydroelectric dam on tree growth and mortality in floodplain forests

    NASA Astrophysics Data System (ADS)

    Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.

    2017-12-01

    The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration

  7. Downstream passage and impact of turbine shutdowns on survival of silver American Eels at five hydroelectric dams on the Shenandoah River

    USGS Publications Warehouse

    Eyler, Sheila; Welsh, Stuart A.; Smith, David R.; Rockey, Mary

    2016-01-01

    Hydroelectric dams impact the downstream migrations of silver American Eels Anguilla rostrata via migratory delays and turbine mortality. A radiotelemetry study of American Eels was conducted to determine the impacts of five run-of-the-river hydroelectric dams located over a 195-km stretch of the Shenandoah River, Virginia–West Virginia, during fall 2007–summer 2010. Overall, 96 radio-tagged individuals (mean TL = 85.4 cm) migrated downstream past at least one dam during the study. Most American Eels passed dams relatively quickly; over half (57.9%) of the dam passage events occurred within 1 h of reaching a dam, and most (81.3%) occurred within 24 h of reaching the dam. Two-thirds of the dam passage events occurred via spill, and the remaining passage events were through turbines. Migratory delays at dams were shorter and American Eels were more likely to pass via spill over the dam during periods of high river discharge than during low river discharge. The extent of delay in migration did not differ between the passage routes (spill versus turbine). Twenty-eight American Eels suffered turbine-related mortality, which occurred at all five dams. Mortality rates for eels passing through turbines ranged from 15.8% to 40.7% at individual dams. Overall project-specific mortality rates (with all passage routes combined) ranged from 3.0% to 14.3%. To protect downstream-migrating American Eels, nighttime turbine shutdowns (1800–0600 hours) were implemented during September 15–December 15. Fifty percent of all downstream passage events in the study occurred during the turbine shutdown period. Implementation of the seasonal turbine shutdown period reduced cumulative mortality from 63.3% to 37.3% for American Eels passing all five dams. Modifying the turbine shutdown period to encompass more dates in the spring and linking the shutdowns to environmental conditions could provide greater protection to downstream-migrating American Eels.

  8. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12569-001] Enloe... copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE... concrete gravity arch dam with an integrated 276- foot-long central overflow spillway with 5-foot-high...

  9. Culinary and pressure irrigation water system hydroelectric generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christiansen, Cory

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reducemore » pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.« less

  10. Influence of environmental variables on diffusive greenhouse gas fluxes at hydroelectric reservoirs in Brazil.

    PubMed

    Rogério, J P; Santos, M A; Santos, E O

    2013-11-01

    For almost two decades, studies have been under way in Brazil, showing how hydroelectric reservoirs produce biogenic gases, mainly methane (CH4) and carbon dioxide (CO2), through the organic decomposition of flooded biomass. This somewhat complex phenomenon is due to a set of variables with differing levels of interdependence that directly or indirectly affect greenhouse gas (GHG) emissions. The purpose of this paper is to determine, through a statistical data analysis, the relation between CO2, CH4 diffusive fluxes and environmental variables at the Furnas, Itumbiara and Serra da Mesa hydroelectric reservoirs, located in the Cerrado biome on Brazil's high central plateau. The choice of this region was prompted by its importance in the national context, covering an area of some two million square kilometers, encompassing two major river basins (Paraná and Tocantins-Araguaia), with the largest installed power generation capacity in Brazil, together accounting for around 23% of Brazilian territory. This study shows that CH4 presented a moderate negative correlation between CO2 and depth. Additionally, a moderate positive correlation was noted for pH, water temperature and wind. The CO2 presented a moderate negative correlation for pH, wind speed, water temperature and air temperature. Additionally, a moderate positive correlation was noted for CO2 and water temperature. The complexity of the emission phenomenon is unlikely to occur through a simultaneous understanding of all the factors, due to difficulties in accessing and analyzing all the variables that have real, direct effects on GHG production and emission.

  11. A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system

    NASA Astrophysics Data System (ADS)

    Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson

    2016-06-01

    Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.

  12. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less

  13. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Acquisition and Easements, Hydraulics and Hydrology, Water Rights, Project Features and Design, Power... Federal water resource projects, Reclamation will consider proposals for non-Federal development of... part of the Klamath Project, the United States constructed A, B, and C-Canals, which carry water south...

  14. Public commitment, resistance to advertising, and leisure promotion in a school-based drug abuse prevention program: a component dismantling study.

    PubMed

    Hernández-Serrano, Olga; Griffin, Kenneth W; García-Fernández, José Manuel; Orgilés, Mireia; Espada, José P

    2013-01-01

    The objective of the present study was to examine the contribution of three intervention components (public commitment, resistance to advertising, and leisure promotion) on alcohol and protective variables in a school-based substance use prevention program. Participants included 480 Spanish students aged from 14 to 16 who received the Saluda prevention program in one of the following five experimental conditions: complete program, program minus public commitment, program minus resistance to advertising, program minus leisure promotion, and a waiting-list control. The students completed self-report surveys at pretest, posttest, and 6-month follow-up assessments. When excluding the healthy leisure promotion component, the Saluda program showed no loss of efficacy neither on alcohol use nor on other substance-related variables, while public commitment and resistance to advertising improved the aforementioned program's efficacy.

  15. Research of hydroelectric generating set low-frequency vibration monitoring system based on optical fiber sensing

    NASA Astrophysics Data System (ADS)

    Min, Li; Zhang, Xiaolei; Zhang, Faxiang; Sun, Zhihui; Li, ShuJuan; Wang, Meng; Wang, Chang

    2017-10-01

    In order to satisfy hydroelectric generating set low-frequency vibration monitoring, the design of Passive low-frequency vibration monitoring system based on Optical fiber sensing in this paper. The hardware of the system adopts the passive optical fiber grating sensor and unbalanced-Michelson interferometer. The software system is used to programming by Labview software and finishing the control of system. The experiment show that this system has good performance on the standard vibration testing-platform and it meets system requirements. The frequency of the monitoring system can be as low as 0.2Hz and the resolution is 0.01Hz.

  16. Duke Engineering explores huge African Power Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newman, P.

    1994-10-14

    Duke Engineering & Services and the African Republic of Uganda have entered into a memorandum of understanding to explore the feasibility of installing one or more hydropower plants along the Nile River and building a 2,000 mile transmission line through southern Africa. The project`s participants say they envision a southern African electricity grid connecting all countries in the region. A team comprised of officials from DE&S, Edlow and SAD-ELEC will conduct a six-month, two-part study on the feasibility of linking the existing grid system in the region. The first part of the study will look at the feasibility of installingmore » one or more independent hydropower plants along the Nile and other rivers in Uganda. The second part will explore the design, construction and operation of a transmission system to interconnect Uganda, through neighboring countries to the south and east, to the Republic of South Africa. The site for the proposed hydroelectric plant will determine the route of the transmission line.« less

  17. 78 FR 42516 - Nevada Irrigation District; Pacific Gas and Electric Company; Public Meetings Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... Drum-Spaulding and Yuba-Bear Hydroelectric Projects On May 17, 2013, the Commission issued a Notice of Availability of the Draft Environmental Impact Statement for the Drum-Spaulding and Yuba-Bear Hydroelectric...

  18. Haines - Scagway Submarine Cable Intertie Project, Haines to Scagway, Alaska Final Technical and Construction Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    See, Alan; Rinehart, Bennie N; Marin, Glen

    1998-11-01

    The Haines to Skagway submarine cable project is located n Taiya Inlet, at the north end of Lynn Canal, in Southeast Alaska. The cable is approximately 15 miles long, with three landings and splice vaults. The cable is 35 kV, 3-Phase, and armored. The cable interconnects the Goat Lake Hydro Project near Skagway with the community of Haines. Both communities are now on 100% hydroelectric power. The Haines to Skagway submarine cable is the result of AP&T's goal of an alternative, economic, and environmentally friendly energy source for the communities served and to eliminate the use of diesel fuel asmore » the primary source of energy. Diesel units will continue to be used as a backup system.« less

  19. A new methodology for royalties distribution of the Itaipu hydroelectric plant: The hydrographic basin as the unit of analysis.

    PubMed

    Lorenzon, Alexandre Simões; Ribeiro, Carlos Antonio Alvares Soares; Dos Santos, Alexandre Rosa; de Castro, Nero Lemos Martins; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Teixeira, Thaisa Ribeiro; Silva, Elias; Soares, Vicente Paulo; Menezes, Sady Júnior Martins da Costa de; de Almeida Telles, Lucas Arthur; Mota, Pedro Henrique Santos

    2018-07-01

    Over the past few years, many sectors such as energy generation, industry, domestic supply, and agriculture have encountered serious environmental problems due to the lack of rainfall. Thus, the purpose of this paper is to review the current methodology of royalties distribution from Itaipu hydroelectric plant. In the proposed approach, two criteria were considered to establish the division of Itaipu royalties: (1) the relative percentage of the water flow in the generation of electricity and, (2) the relative percentage of the drop in the height of water. 62 hydroelectric plants were evaluated in this study. In 52 plants the water flow was the factor that most contributed to the generation of electricity. In 2013, 346 municipalities benefited the Itaipu royalties. With the proposed methodology, 1,327 municipalities will receive the resource, what would increase the revenue of each of these municipalities by, on average, US$ 87,436.91 per year. The methodology presented herein proposes a reduction in the environmental disparity that now exists in Brazil, through improvement to Government instruments and environmental policies. The distribution of royalties throughout the watershed can provide additional resources to support payment programs for environmental services at the state and municipality levels. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. Evaluation of mosquito (Diptera: Culicidae) species richness using two sampling methods in the hydroelectric reservoir of Simplício, Minas Gerais, Brazil.

    PubMed

    Alencar, Jeronimo; de Mello, Viviane Soares; Serra-Freire, Nicolau Maués; Silva, Júlia dos Santos; Morone, Fernanda; Guimarães, Anthony Érico

    2012-04-01

    We compared two types of light traps used for monitoring mosquito abundance in the hydroelectric reservoir of Simplício, Além Paraíba - Minas Gerais. Mosquitoes were captured bimonthly using automatic CDC and Shannon traps before the filling of the hydroelectric plant reservoir from December 2008 to December 2009. In total, 1474 specimens from 13 genera were captured. Among the captured specimens, several species known to be vectors of disease-causing agents for humans and/or animals were identified, including Anopheles aquasalis, Aedes albopictus, Coquillettidia venezuelensis, Haemagogus leucocelaenus, and Aedes scapularis. Sampling efficacy between the four capture sites was not found to be significantly different, irrespective of species captured or type of trap used. Poor correlation (r (x, y) = -0.0444) between the number of mosquito species and capture site was observed when not influenced by the type of trap used. Among the installation sites of the CDC and Shannon traps in the areas investigated, CDC traps fixed in livestock shelters obtained an overall higher abundance of species captured.

  1. Development of a 1 D hydrodynamic habitat model for the Hippopotamus amphibious as basis for sustainable exploitation of hydroelectric power

    NASA Astrophysics Data System (ADS)

    Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.

    2009-12-01

    Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the

  2. [Experience in organization of joint actions of expert divisions during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station].

    PubMed

    Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L

    2010-01-01

    The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.

  3. Drought Impacts on Reservoir Storage and Hydro-electricity Production in Southeastern Brazil

    NASA Astrophysics Data System (ADS)

    Scanlon, B. R.; Melo, D. D.; Yin, L.; Wendland, E.

    2015-12-01

    Brazilian hydroelectric plants (HP) generate ~85% of the total electricity in the country (138 GW). More than half of the number largest reservoirs are located in the Southeast/Midwest region, where ~50% of the population (~100 million) lives. The 2014 drought raised several questions about the resilience of the water sources when several urban centers, including Brazilian's largest metropolis (São Paulo, 20 million people), had their water supply threatened. Such drought also affected reservoirs of hydroelectric plants. This study assesses how the storage and, thus the electricity generation, in 14 of the largest reservoirs were affected by drought events within the past 20 years. We computed the Standardized Precipitation Index (SPI) to identify rainfall anomalies throughout the analyzed period. To evaluate the impacts on surface water, we assessed the changes in total (surface+ subsurface) runoff and soil moisture from Global Land Data Assimilation System (GLDAS) and in Total Water Storage (TWS) from Gravity Recovery and Climate Experiment (GRACE) satellite data. We evaluated the anomalies and significance of the changes in reservoir storage (RS) and electricity generation. The results show that severe dry years (-1.5 < SPI <-2.0) reduce reservoir storage (RS) by up to ~60% of its total capacity. Both electricity generation and reservoir storage showed strong negative trends between 2011 and 2014. Our results also indicate that within the past 20 years, two major depletions in reservoir storage occurred: 2001 and 2014. However, due to lower soil moisture in 2013 compared to that in 2000, distinct impacts were observed on the reservoirs with much stronger impacts on reservoir storage in 2014 relative to those in 2001. No meaningful changes in runoff were shown by GLDAS during the 2014 drought. The observed depletion in the RS in 2014 was similar to that in the TWS, as shown by GRACE data. In 2014, the electricity production by the HP declined by ~20%. As a

  4. Norway's historical and projected water balance in TWh

    NASA Astrophysics Data System (ADS)

    Haddeland, Ingjerd; Holmqvist, Erik

    2015-04-01

    Hydroelectric power production is closely linked to the water cycle, and variations in power production numbers reflect variations in weather. The expected climate changes will influence electricity supply through changes in annual and seasonal inflow of water to hydropower reservoirs. In Norway, more than 95 percent of the electricity production is from hydroelectric plants, and industry linked to hydropower has been an important part of the society for more than a century. Reliable information on historical and future available water resources is hence of crucial importance both for short and long-term planning and adaptation purposes in the hydropower sector. Traditionally, the Multi-area Power-market Simulator (EMPS) is used for modelling hydropower production in Norway. However, due to the models' high level of details and computational demand, this model is only used for historical analyses and a limited number of climate projections. A method has been developed that transfers water fluxes (mm day-1) and states (mm) into energy units (GWh mm-1), based on hydrological modelling of a limited number of catchments representing reservoir inflow to more than 700 hydropower plants in Norway. The advantages of using the conversion factor method, compared to EMPS, are its simplicity and low computational requirements. The main disadvantages are that it does not take into account flood losses and the time lag between inflow and power production. The method is used operationally for weekly and seasonal energy forecasts, and has proven successful at the range of results obtained for reproducing historical hydropower production numbers. In hydropower energy units, mean annual precipitation for the period 1981-2010 is estimated at 154 TWh year-1. On average, 24 TWh year-1 is lost through evapotranspiration, meaning runoff equals 130 TWh year-1. There are large interannual variations, and runoff available for power production ranges from 91 to 165 TWh year-1. The snow pack

  5. Spatial variation of sediment mineralization supports differential CO2 emissions from a tropical hydroelectric reservoir.

    PubMed

    Cardoso, Simone J; Vidal, Luciana O; Mendonça, Raquel F; Tranvik, Lars J; Sobek, Sebastian; Fábio, Roland

    2013-01-01

    Substantial amounts of organic matter (OM) from terrestrial ecosystems are buried as sediments in inland waters. It is still unclear to what extent this OM constitutes a sink of carbon, and how much of it is returned to the atmosphere upon mineralization to carbon dioxide (CO2). The construction of reservoirs affects the carbon cycle by increasing OM sedimentation at the regional scale. In this study we determine the OM mineralization in the sediment of three zones (river, transition, and dam) of a tropical hydroelectric reservoir in Brazil as well as identify the composition of the carbon pool available for mineralization. We measured sediment organic carbon mineralization rates and related them to the composition of the OM, bacterial abundance and pCO2 of the surface water of the reservoir. Terrestrial OM was an important substrate for the mineralization. In the river and transition zones most of the OM was allochthonous (56 and 48%, respectively) while the dam zone had the lowest allochthonous contribution (7%). The highest mineralization rates were found in the transition zone (154.80 ± 33.50 mg C m(-) (2) d(-) (1)) and the lowest in the dam (51.60 ± 26.80 mg C m(-) (2) d(-) (1)). Moreover, mineralization rates were significantly related to bacterial abundance (r (2) = 0.50, p < 0.001) and pCO2 in the surface water of the reservoir (r (2) = 0.73, p < 0.001). The results indicate that allochthonous OM has different contributions to sediment mineralization in the three zones of the reservoir. Further, the sediment mineralization, mediated by heterotrophic bacteria metabolism, significantly contributes to CO2 supersaturation in the water column, resulting in higher pCO2 in the river and transition zones in comparison with the dam zone, affecting greenhouse gas emission estimations from hydroelectric reservoirs.

  6. State of the dam at the Zeya hydroelectric station with consideration of the geodynamic effect

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marchuk, A.N.; Dudchenko, L.N.; Bolgov, V.V.

    1995-11-01

    The buttress dam of the Zeya hydroelectric station has already been operating successfully for 20 years under complex climatic, geological, and seismological conditions. Additional difficulties are created by some uncertainty of the interaction of the structure with the geological environment subjected to tectonic movements. The seismotectonic conditions of the region of the Zeya reservoir are determined by proximity to the boundary of two large structural zones with a different character of tectonic movements: regions of the uplift of the Tukuringra-Soktokhan Range and the downwarping Amur-Zeya Plateau. This boundary is represented by the Pkan fault located about 1 km from themore » dam on the downstream side.« less

  7. The Impacts of Wind Speed Trends and Long-term Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest

    NASA Astrophysics Data System (ADS)

    Cross, B.; Kohfeld, K. E.; Cooper, A.; Bailey, H. J.; Rucker, M.

    2013-12-01

    The use of wind power is growing rapidly in the Pacific Northwest (PNW ) due to environmental concerns, decreasing costs of implementation, strong wind speeds, and a desire to diversify electricity sources to minimize the impacts of streamflow variability on electricity prices and system flexibility. In hydroelectric dominated systems, like the PNW, the benefits of wind power can be maximized by accounting for the relationship between long term variability in wind speeds and reservoir inflows. Clean energy policies in British Columbia make the benefits of increased wind power generation during low streamflow periods particularly large, by preventing the overbuilding of marginal hydroelectric projects. The goal of this work was to quantify long-term relationships between wind speed and streamflow behavior in British Columbia. Wind speed data from the North American Regional Reanalysis (NARR) and cumulative usable inflows (CUI) from BC Hydro were used to analyze 10m wind speed and density (WD) trends, WD-CUI correlations, and WD anomalies during low and high inflow periods in the PNW (40°N to 65°N, 110°W to 135°W) from 1979-2010. Statistically significant positive wind speed and density trends were found for most of the PNW, with the largest increases along the Pacific Coast. CUI-WD correlations were weakly positive for most regions, with the highest values along the US coast (r ~0.55), generally weaker correlations to the north, and negative correlations (r ~ -0.25) along BC's North Coast. When considering seasonal relationships, the Spring freshet was coincident with lower WD anomalies west of the Rocky Mountains and higher WDs to the east. A similar but opposite pattern was observed for low inflow winter months. When considering interannual variability, lowest inflow years experienced positive WD anomalies (up to 40% increases) for the North Coast. In highest inflow years, positive WD anomalies were widespread in the US and for smaller patches of central BC

  8. Conducting a FERC environmental assessment: a case study and recommendations from the Terror Lake Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olive, S.W.; Lamb, B.L.

    This paper is an account of the process that evolved during acquisition of the license to operate the Terror Lake hydro-electric power project under the auspices of the Federal Energy Regulatory Commission (FERC). The Terror River is located on Kodiak Island in Alaska. The river is within the Kodiak National Wildlife Refuge; it supports excellent runs of several species of Pacific Salmon which are both commercially important and a prime source of nutrition for the Kodiak brown bear. This paper discusses both the fish and wildlife questions, but concentrates on instream uses and how protection of these uses was decided.more » In this focus the paper explains the FERC process, gives a history of the Terror Lake Project, and, ultimately, makes recommendations for improved management of controversies within the context of FERC licensing procedures. 64 references.« less

  9. Water Footprint of Hydroelectricity: A Case Study of Two Large Canadian Boreal Watersheds

    NASA Astrophysics Data System (ADS)

    Irambona, C.; Music, B.; Nadeau, D.; Mahdi, T. F.; Strachan, I. B.

    2015-12-01

    20% of Canada's total freshwater is located in the province of Quebec, where 30% of the country's energy is produced from hydropower. Hydroelectric generation uses a considerable amount of water through evaporation from the reservoirs. The blue water footprint is an indicator of the annual freshwater consumption related to hydropower production. Although environmental effects of reservoir impounding have been previously investigated, their impacts on local and regional evapotranspiration are still not well understood due to the lack of long-term observation data. This study aims to assess the blue water footprint of two large hydroelectric systems located in the Canadian boreal forest. To do so, we use hydro-meteorological data from two specially designed climate simulations (a 'no-reservoir' and a 'post-impoundment' simulation) performed by the fifth generation of the Canadian Regional Climate Model (CRCM5) driven by the ERA-Interim reanalysis. Land-surface processes in the CRCM5 are parameterized by the Canadian Land Surface Scheme (CLASS V3.6), while surface fluxes over the water bodies are simulated by the 1-D lake model (Flake). A 'no-reservoir' and a 'post-impoundment' simulation are carried by adjusting the water fraction on the reservoir grids. Both simulations cover a 42 years period (1970-2012) at 0.11° horizontal resolution, consisting of 300 x 300 grid points centered on the province of Quebec. The two watersheds under study (200 000 km² total) are located in Northern Quebec (49-54°N), Canada, where more than 42% of the province power generation capacity is installed with eight reservoirs covering a total area of 10 000 km². A first validation of the 'post-impoundment' simulation is performed using micrometeorological ground observations, complemented with available hydro-meteorological data from Environment Canada weather stations. Then, each reservoir water footprint is calculated using the 'post-impoundment' simulation. Finally, the net

  10. Grid-connected in-stream hydroelectric generation based on the doubly fed induction machine

    NASA Astrophysics Data System (ADS)

    Lenberg, Timothy J.

    Within the United States, there is a growing demand for new environmentally friendly power generation. This has led to a surge in wind turbine development. Unfortunately, wind is not a stable prime mover, but water is. Why not apply the advances made for wind to in-stream hydroelectric generation? One important advancement is the creation of the Doubly Fed Induction Machine (DFIM). This thesis covers the application of a gearless DFIM topology for hydrokinetic generation. After providing background, this thesis presents many of the options available for the mechanical portion of the design. A mechanical turbine is then specified. Next, a method is presented for designing a DFIM including the actual design for this application. In Chapter 4, a simulation model of the system is presented, complete with a control system that maximizes power generation based on water speed. This section then goes on to present simulation results demonstrating proper operation.

  11. Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.

    2008-07-29

    Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to mergingmore » and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.« less

  12. Spatial-temporal dynamics and sources of total Hg in a hydroelectric reservoir in the Western Amazon, Brazil.

    PubMed

    Pestana, I A; Bastos, W R; Almeida, M G; de Carvalho, D P; Rezende, C E; Souza, C M M

    2016-05-01

    Damming rivers to construct hydroelectric reservoirs results in a series of impacts on the biogeochemical Hg cycle. For example, modifying the hydrodynamics of a natural watercourse can result in the suspension and transport of Hg deposits in the water column, which represents an exposure risk for biota. The objective of this study was to evaluate the influences of seasonality on the dispersion of total Hg in the Hydroelectric Power Plant (HPP)-Samuel Reservoir (Porto Velho/Brazil). Sampling campaigns were performed during the three following hydrological periods characteristic of the region: low (Oct/2011), ebbing (May/2012), and high (Feb/2013) water. Sediment profiles, suspended particulate matter (SPM), and aquatic macrophytes (Eicchornia crassipes and Oryza spp.) were collected, and their Hg concentrations and isotopic and elemental C and N signatures were determined. The drainage basin significantly influenced the SPM compositions during all the periods, with a small autochthonous influence from the reservoir during the low water. The highest SPM Hg concentrations inside the reservoir were observed during the high water period, suggesting that the hydrodynamics of this environment favor the suspension of fine SPM, which has a higher Hg adsorption capacity. The Hg concentrations in the sediment profiles were ten times lower than those in the SPM, indicating that large particles with low Hg concentrations were deposited to form the bottom sediment. Hg concentrations were higher in aquatic macrophyte roots than in their leaves and appeared to contribute to the formation of SPM during the low water period. In this environment, Hg transport mainly occurs in SPM from the Jamari River drainage basin, which is the primary source of Hg in this environment.

  13. Harnessing Alaska. [Hydroelectric power in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Four hydropower projects will provide electricity for isolated Alaskan cities by late 1984. A 15Mw project is already producing power. The three remaining hydro projects are described. Tyee Lake is a lake tap project. Water is supplied to the powerhouse by tapping the lake via a tunnel blasted through the lake bottom. Water then flows through a vertical pressure shaft to a power tunnel and into an aboveground powerhouse. Swan Lake consists of a double-curved arch dam and a power tunnel. Terror Lake consists of a concrete-faced compacted rockfill dam and a power tunnel.

  14. PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ON #1 PENSTOCK. PROJECT SPONSORED BY THE ELECTRICAL POWER RESEARCH INSTITUTE TO TRANSFER FISH DOWNSTREAM PAST THE TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA

  15. State Models to Incentivize and Streamline Small Hydropower Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis, Taylor; Levine, Aaron; Johnson, Kurt

    In 2016, the hydropower fleet in the United States produced more than 6 percent (approximately 265,829 gigawatt-hours [GWh]) of the total net electricity generation. The median-size hydroelectric facility in the United States is 1.6 MW and 75 percent of total facilities have a nameplate capacity of 10 MW or less. Moreover, the U.S. Department of Energy's Hydropower Vision study identified approximately 79 GW hydroelectric potential beyond what is already developed. Much of the potential identified is at low-impact new stream-reaches, existing conduits, and non-powered dams with a median project size of 10 MW or less. To optimize the potential andmore » value of small hydropower development, state governments are crafting policies that provide financial assistance and expedite state and federal review processes for small hydroelectric projects. This report analyzes state-led initiatives and programs that incentivize and streamline small hydroelectric development.« less

  16. 52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523691 (sheet no. 6; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  17. Brigham City Hydro Generation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ammons, Tom B.

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicatedmore » that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the

  18. 77 FR 55203 - Monroe City, UT: Notice of Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Project: Monroe Cold Spring Hydroelectric Project. f. Location: The proposed Monroe Cold Spring... document on that resource agency. l. Description of the project: The proposed Monroe Cold Spring...

  19. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    PubMed

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  20. Physical and Biological Impacts of Changing Land-Uses and the Environment

    NASA Astrophysics Data System (ADS)

    English, W. R.; Pike, J. W.; Jolley, L. W.; Goddard, M. A.; Biondi, M. J.; Hur, J. M.; Powell, B. A.; Morse, J. C.

    2005-05-01

    A goal of the Changing Land Use and the Environment (CLUE) project is to characterize surface water quality impacted by land-use change in the Saluda and Reedy River watersheds of South Carolina. The CLUE project focuses on impacts common to urban development including 1. sedimentation from construction sites, 2. alteration of discharge and channel morphology due to increased impervious surfaces, 3. macroinvertebrate community response to sedimentation and habitat alteration, and 4. microbial contamination. We found that mean streambed particle size was reduced in developing areas. Stream cross-sectional areas enlarged in catchments with high percentages of impervious surfaces. Sedimentation and altered discharge resulted in the benthic macroinvertebrate community showing a general reduction in biotic integrity values and reductions in Plecoptera taxa richness. Fecal coliform levels were higher for both surface water and bottom sediments in and below urbanized areas during base flows. Levels of fecal coliform in samples collected during storm flows were significantly higher than in base flows, and were correlated with high sediment loads.

  1. Uncovering the Minor Contribution of Land-Cover Change in Upland Forests to the Net Carbon Footprint of a Boreal Hydroelectric Reservoir.

    PubMed

    Dessureault, Pierre-Luc; Boucher, Jean-François; Tremblay, Pascal; Bouchard, Sylvie; Villeneuve, Claude

    2015-07-01

    Hydropower in boreal conditions is generally considered the energy source emitting the least greenhouse gas per kilowatt-hour during its life cycle. The purpose of this study was to assess the relative contribution of the land-use change on the modification of the carbon sinks and sources following the flooding of upland forested territories to create the Eastmain-1 hydroelectric reservoir in Quebec's boreal forest using Carbon Budget Model of the Canadian Forest Sector. Results suggest a carbon sink loss after 100 yr of 300,000 ± 100,000 Mg CO equivalents (COe). A wildfire sensitivity analysis revealed that the ecosystem would have acted as a carbon sink as long as <75% of the territory had burned over the 100-yr-long period. Our long-term net carbon flux estimate resulted in emissions of 4 ± 2 g COe kWh as a contribution to the carbon footprint calculation, one-eighth what was obtained in a recent study that used less precise and less sensitive estimates. Consequently, this study significantly reduces the reported net carbon footprint of this reservoir and reveals how negligible the relative contribution of the land-use change in upland forests to the total net carbon footprint of a hydroelectric reservoir in the boreal zone can be. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  2. Environmental impact assessment for alternative-energy power plants in México.

    PubMed

    González-Avila, María E; Beltrán-Morales, Luis Felipe; Braker, Elizabeth; Ortega-Rubio, Alfredo

    2006-07-01

    Ten Environmental Impact Assessment Reports (EIAR) were reviewed for projects involving alternative power plants in Mexico developed during the last twelve years. Our analysis focused on the methods used to assess the impacts produced by hydroelectric and geothermal power projects. These methods used to assess impacts in EIARs ranged from the most simple, descriptive criteria, to quantitative models. These methods are not concordant with the level of the EIAR required by the environmental authority or even, with the kind of project developed. It is concluded that there is no correlation between the tools used to assess impacts and the assigned type of the EIAR. Because the methods to assess impacts produced by these power projects have not changed during 2000 years, we propose a quantitative method, based on ecological criteria and tools, to assess the impacts produced by hydroelectric and geothermal plants, according to the specific characteristics of the project. The proposed method is supported by environmental norms, and can assist environmental authorities in assigning the correct level and tools to be applied to hydroelectric and geothermal projects. The proposed method can be adapted to other production activities in Mexico and to other countries.

  3. 51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523690 (sheet no. 5; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA

  4. Economic valuation of the downstream hydrological effects of land use change: Large hydroelectric reservoirs

    NASA Astrophysics Data System (ADS)

    Aylward, Bruce Allan

    1998-12-01

    Land use change that accompanies economic development and population growth is intended to raise the economic productivity of land. An inevitable by product of this process is the alteration of natural vegetation and downstream hydrological function. This dissertation explores hydrological externalities of land use change in detail, particularly with regard to their economic impact on large hydroelectric reservoirs (LHRs). A review of the linkages between land use, hydrological function and downstream economic activity suggests that on theoretical grounds the net welfare effect of land use change on hydrological function will be indeterminate. Review of the literature suggests that, though the effects of downstream sedimentation will typically be negative, they may often be of little practical significance. The literature on water quantity impacts is sparse at best. This is most surprising in the case of the literature on LHRs where the potentially important and positive effects of increased water yield are typically ignored in favor of simplistic efforts to document the negative effects of reservoir sedimentation. In order to improve the methodological basis for the economic valuation of hydrological externalities, the dissertation considers existing techniques for the evaluation of non-marketed goods and services, clarifying the manner in which they have been and, in the future, may be applied to the topic at hand. A deterministic simulation model is then constructed for the case of LHRs. The model incorporates the effect of changes in water yield, the seasonal pattern of water yield and sedimentation of live and dead storage volumes as they affect reservoir operation and the production of hydroelectricity. The welfare effects of changes in the productivity of the LHR in the short run and changes to the power system expansion plan in the long run are evaluated using the marginal opportunity costs of alternative power sources and power plants, respectively. A case

  5. Indian energy sources in 1980's

    NASA Astrophysics Data System (ADS)

    Chaturvedi, A. C.

    Indian energy sources for electrical power generation are surveyed with a view to the development of the available hydroelectric resources. The capital-intensive nature of hydroelectric projects and their long gestation periods have impeded the rapid exploitation of the hydroelectric resources in the country, which are expected to provide 37% of the 16,200 MW capacity anticipated by 2001. Alternative sources of power such as solar and wind energy, biogas conversion and the use of industrial waste heat to produce electricity are discussed with case studies presented.

  6. Hydroelectric power plant with variable flow on drinking water adduction

    NASA Astrophysics Data System (ADS)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  7. 76 FR 60488 - Pacific Green Power, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    .... d. Submitted by: Pacific Green Power, LLC. e. Name of Project: Two Girls Creek Hydroelectric Project. f. Location: On Two Girls Creek River, in Linn County, Washington. The project occupies United...

  8. 78 FR 21933 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... feasibility of the Palo Verde Diversion Dam Hydroelectric Project (Palo Verde Diversion Dam Project or project... Southern California Edison transmission line located approximately one mile west of the Palo Verde Dam. An...

  9. 75 FR 38517 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ..., FERC, CA, Kilarc-Cow Creek Hydroelectric Project (FERC Project No. 606) Proposes to Surrender the License for Operation Project, Old Crow Creek and South Cow Creek, Shasta County, CA, Comment Period Ends...

  10. Dataset of long-term monitoring of ground-dwelling ants (Hymenoptera: Formicidae) in the influence areas of a hydroelectric power plant on the Madeira River in the Amazon Basin

    PubMed Central

    2018-01-01

    Abstract Background Biodiversity loss is accelerating rapidly in response to increasing human influence on the Earth’s natural ecosystems. One way to overcome this problem is by focusing on places of human interest and monitoring the changes and impacts on the biodiversity. This study was conducted at six sites within the influence area of the Santo Antônio Hydroelectric Power Plant in the margins of the Madeira River in Rondônia State. The sites cover a latitudinal gradient of approximately 100 km in the Brazilian Amazon Basin. The sampling design included six sampling modules with six plots (transects) each, totaling 30 sampling plots. The transects were distributed with 0 km, 0.5 km, 1 km, 2 km, 3 km and 4 km, measured perpendicularly from the river margin towards the interior of the forest. For sampling the ground-dwelling ants, the study used the ALL (ants of the leaf litter) protocol, which is standardized globally in the inventories of ant fauna. For the purpose of impact indicators, the first two campaigns (September 2011 to November 2011) were carried out in the pre-filling period, while campaigns 3 to 10 (February 2012 to November 2014) were carried out during and after the filling of the hydroelectric reservoir. A total of 253 events with a total of 9,165 occurrences were accounted during the monitoring. The ants were distributed in 10 subfamilies, 68 genera and 324 species/morphospecies. The impact on ant biodiversity during the periods before and after filling was measured by ecological indicators and by the presence and absence of some species/morphospecies. This is the first study, as far as we know, including taxonomic and ecological treatment to monitor the impact of a hydroelectric power plant on ant fauna. New information Until recently, most studies conducted on hydroelectric plants, located in the Amazon Basin, were carried out after the implementation of dams in order to assess their impacts on the environment and biodiversity (Benchimol

  11. Dataset of long-term monitoring of ground-dwelling ants (Hymenoptera: Formicidae) in the influence areas of a hydroelectric power plant on the Madeira River in the Amazon Basin.

    PubMed

    Fernandes, Itanna O; de Souza, Jorge L P

    2018-01-01

    Biodiversity loss is accelerating rapidly in response to increasing human influence on the Earth's natural ecosystems. One way to overcome this problem is by focusing on places of human interest and monitoring the changes and impacts on the biodiversity. This study was conducted at six sites within the influence area of the Santo Antônio Hydroelectric Power Plant in the margins of the Madeira River in Rondônia State. The sites cover a latitudinal gradient of approximately 100 km in the Brazilian Amazon Basin. The sampling design included six sampling modules with six plots (transects) each, totaling 30 sampling plots. The transects were distributed with 0 km, 0.5 km, 1 km, 2 km, 3 km and 4 km, measured perpendicularly from the river margin towards the interior of the forest. For sampling the ground-dwelling ants, the study used the ALL (ants of the leaf litter) protocol, which is standardized globally in the inventories of ant fauna. For the purpose of impact indicators, the first two campaigns (September 2011 to November 2011) were carried out in the pre-filling period, while campaigns 3 to 10 (February 2012 to November 2014) were carried out during and after the filling of the hydroelectric reservoir. A total of 253 events with a total of 9,165 occurrences were accounted during the monitoring. The ants were distributed in 10 subfamilies, 68 genera and 324 species/morphospecies. The impact on ant biodiversity during the periods before and after filling was measured by ecological indicators and by the presence and absence of some species/morphospecies. This is the first study, as far as we know, including taxonomic and ecological treatment to monitor the impact of a hydroelectric power plant on ant fauna. Until recently, most studies conducted on hydroelectric plants, located in the Amazon Basin, were carried out after the implementation of dams in order to assess their impacts on the environment and biodiversity (Benchimol and Peres 2015, Latrubesse et al. 2017

  12. Diversity and activity pattern of wildlife inhabiting catchment of Hulu Terengganu Hydroelectric Dam, Terengganu, Peninsular Malaysia

    NASA Astrophysics Data System (ADS)

    Adyla, M. N. Nurul; Ikhwan, Z.; Zuhairi, M.; Ngah, Shukor, M. N.

    2016-11-01

    A series of camera trapping surveys were conducted to study the diversity and distribution of wildlife within the catchment of Hulu Terengganu Hydroelectric Dam. A total of 124 camera traps were deployed at nine study sites, continuously from June 2014 until December 2015. The total effort of camera trap surveys from all the study sites during the 18-month sampling period was 29,128 night traps, from which a total of 32 species of wildlife representing nine Orders were recorded. The most common species were Eurasian Wild Pig (Sus scrofa), Barking Deer (Munticus muntjak), and Malayan Tapir (Tapirus indicus). Camera trap data on activity patterns show that Gallus gallus, Muntiacus muntjak and Sus scrofa are diurnal animals, whereas Tapirus indicus, Elephas maximus and Helarctos malayanus are nocturnal animals.

  13. Downstream movement of mature eels in a hydroelectric reservoir in New Zealand

    USGS Publications Warehouse

    Watene, E.M.; Boubee, J.A.T.; Haro, A.

    2003-01-01

    This study investigates the behavior of migrant eels as they approached the Patea hydroelectric dam on the West Coast of the North Island, New Zealand. Seventeen mature migrant eels (870-1,240 mm; 2,000-6,380 g) were implanted with coded acoustic transmitters and released. Their movements in the reservoir were monitored for 14 months with stationary data logging and manual tracking receivers. The downstream migration of sexually maturing eels was found to occur mainly at night, usually during, or immediately after, rainfall events. Eels tended to travel at the surface, within the upper 4 m of the water column, at speeds ranging from 16 to 89 cm/s. Upon reaching the headrace, eels typically spent time searching, presumably for an unobstructed downstream route. In order to aid downstream passage of eels at the Patea Dam, power station operators began spillway opening trials during peak migration periods. Although this allowed some migrant eels to safely pass over the dam, information on the relative effectiveness and cost of this method over other possible mitigation methods is still required. ?? Copyright by the American Fisheries Society 2003.

  14. Impacts of hydroelectric dams on alluvial riparian plant communities in Eastern Brazilian Amazonian.

    PubMed

    Ferreira, Leandro Valle; Cunha, Denise A; Chaves, Priscilla P; Matos, Darley C L; Parolin, Pia

    2013-09-01

    The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.

  15. An application of extreme value theory to the management of a hydroelectric dam.

    PubMed

    Minkah, Richard

    2016-01-01

    Assessing the probability of very low or high water levels is an important issue in the management of hydroelectric dams. In the case of the Akosombo dam, very low and high water levels result in load shedding of electrical power and flooding in communities downstream respectively. In this paper, we use extreme value theory to estimate the probability and return period of very low water levels that can result in load shedding or a complete shutdown of the dam's operations. In addition, we assess the probability and return period of high water levels near the height of the dam and beyond. This provides a framework for a possible extension of the dam to sustain the generation of electrical power and reduce the frequency of spillage that causes flooding in communities downstream. The results show that an extension of the dam can reduce the probability and prolong the return period of a flood. In addition, we found a negligible probability of a complete shutdown of the dam due to inadequate water level.

  16. Behavior and passage of silver-phase American eels, Anguilla rostrata (LeSueur), at a small hydroelectric facility

    USGS Publications Warehouse

    Haro, Alex; Castro-Santos, Ted; Boubée, Jacques

    2000-01-01

    Downstream migrant eels were monitored near a small (51 MW) hydroelectric facility on the Connecticut River (Massachusetts, USA) for two seasons using acoustic and radio telemetry. Eels frequently made several attempts over periods of one to several days to pass the station. Did activity of eels was variable, although most movements occurred at night. Eels occupied a variety of depths in the forebay area, but spent the greater proportion of time at or near the bottom (10 m), occasionally venturing to the surface. Horizontal movements usually spanned across the entire width of the forebay. There was no significant relationship between duration of forebay presence and either flow or light intensity. Although all telemetered eels passed via the turbines, some migrant eels did use a surface bypass.

  17. [The social hygiene problems in the operator work of hydroelectric power station workers and the means for enhancing work capacity].

    PubMed

    Karakashian, A N; Lepeshkina, T R; Ratushnaia, A N; Glushchenko, S S; Zakharenko, M I; Lastovchenko, V B; Diordichuk, T I

    1993-01-01

    Weight, tension and harmfulness of professional activity, peculiarities of labour conditions and characteristics of work, shift dynamics of operative personnel's working capacity were studied in the course of 8-hour working day currently accepted at hydroelectric power stations (HEPS) and experimental 12-hour schedule. Working conditions classified as "admissible", positive dynamics of operators' state, their social and material contentment were a basis for 12-hour two-shift schedule to be recommended as more appropriate. At the same time, problem of optimal shift schedules for operative personnel of HEPS remains unsolved and needs to be further explored.

  18. Determining Columbia and Snake River Project Tailrace and Forebay Zones of Hydraulic Influence using MASS2 Modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2010-12-01

    Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of amore » project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE fishery

  19. Mosquito abundance and behavior in the influence area of the hydroelectric complex on the Madeira River, Western Amazon, Brazil.

    PubMed

    Cruz, Rafael Mesquita Bastos; Gil, Luiz Herman Soares; de Almeida e Silva, Alexandre; da Silva Araújo, Maisa; Katsuragawa, Tony Hiroshi

    2009-11-01

    Malaria is currently highly prevalent and restricted to the north of Brazil, and its dynamics are severely affected by human environmental changes, such as the large dam construction recently approved by the Brazilian Government in Rondônia. We studied the mosquito fauna and behavior before hydroelectric construction. Mosquitoes were captured by human landing catches on the riversides of the Madeira River in Porto Velho, Rondônia. A total of 3121 mosquitoes from eight different genera were collected; only Mansonia and Anopheles darlingi were found in all 21 collection sites throughout the night. These results suggest that the riverines of the study area are exposed to malaria.

  20. Enhancing the resiliency of small hydropower projects: environmental function, modularity, and stakeholder elicitation as design priorities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witt, Adam M; Smith, Brennan T

    Small hydropower plants supply reliable renewable energy to the grid, though few new plants have been developed in the Unites States over the past few decades due to complex environmental challenges and poor project economics. This paper describes the current landscape of small hydropower development, and introduces a new approach to facility design that co-optimizes the extraction of hydroelectric power from a stream with other important environmental functions such as fish, sediment, and recreational passage. The approach considers hydropower facilities as an integrated system of standardized interlocking modules, designed to sustain stream functions, generate power, and interface with the streambed.more » It is hypothesized that this modular eco-design approach, when guided by input from the broader small hydropower stakeholder community, can lead to cost savings across the facility, reduced licensing and approval timelines, and ultimately, to enhanced resiliency through improved environmental performance over the lifetime of the project.« less

  1. 77 FR 51022 - Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing, Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-007] Clark Canyon... b. Project No.: 12429-007. c. Date Filed: May 31, 2012. d. Applicant: Clark Canyon Hydro, LLC . e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: When constructed, the project...

  2. Monterey Peninsula Water Supply Project. Supplemental Draft Environmental Impact Report/Statement II. Volume 2.

    DTIC Science & Technology

    1993-02-01

    Fueled 7,634,0(X) 51 Geothermal 1,302,M(K) 9 Nuclear 2,160,(MX) 14 Total Thermal 11,096,(kM) 74 Hydroelectric 3,877,M(X) 26 Solar 0 0t Total Company...Nuclear 16,273,963 17 "Total Thermal 48,094,316 50 Hydroelectric 8,007,631 8 Solar 35 0 Total Company Generation 56,101,982 58 Helms Pumpback Energy...returnable beverage containers, prohibition of disposable diapers , and other measures to reduce the volume of the urban solid waste streams. Appeaidix 19-B

  3. 78 FR 48185 - Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... organization, length of time in business, experience in funding, design and construction of similar projects... Standard Time) on January 6, 2014. A proposal will be considered timely only if it is received in the... advised to provide sufficient time for delivery. Late proposals will not be considered. ADDRESSES: Send...

  4. 78 FR 27215 - Baker County Oregon; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... the base of Mason dam in the vicinity of the exiting discharge via the project's tailrace. Baker... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12686-004] Baker County...: Baker County, Oregon (Baker County). e. Name of Project: Mason Dam Hydroelectric Project. f. Location...

  5. 76 FR 45239 - PPL Holtwood, LLC; Notice of Application for Amendment of License, and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... available for public inspection: a. Application Type: Non-project use of project lands and waters. b...). d. Applicant: PPL Holtwood, LLC. e. Name of Project: Wallenpaupack Hydroelectric Project. f. Location: The proposed non-project use would be located at the White Sands Springs beach access area on the...

  6. 75 FR 140 - Cordova Electric Cooperative, Inc.; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13328-001] Cordova Electric... Electric Cooperative, Inc. (Cordova Electric). e. Name of Project: Snyder Falls Creek Hydroelectric Project... 5.3 of the Commission's regulations. h. Applicant Contact: Clay Koplin, CEO, Cordova Electric...

  7. Yakama Nation Renewable Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rigdon, Phillip

    2016-05-10

    It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less

  8. 75 FR 4373 - City of Kaukauna, WI; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... application for a new license for the 8-megawatt (MW) Badger-Rapide Croche Hydroelectric Project located on.... Please affix ``Badger-Rapide Croche Project No. 2677-019'' to all comments. Comments may be filed...

  9. 76 FR 58805 - Notice of Availability of Environmental Assessment; Jonathan and Jayne Chase

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... hydropower project exemption for the Troy Hydroelectric Project, to be located on the Missisquoi River, in the Town of Troy in Orleans County, Vermont, and has prepared an Environmental Assessment (EA). In the...

  10. 75 FR 6018 - Boyce Hydro Power, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    .... d. Applicant: Boyce Hydro Power, LLC (BHP). e. Name of Project: Edenville Hydroelectric Project. f... construct the footings and first lift of the retaining walls. BHP states that shutting off the bypass flow...

  11. 75 FR 4362 - Green Island Power Authority; Notice of Application Ready for Environmental Analysis, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13-023] Green Island Power... inspection. a. Type of Application: New Major License. b. Project No.: 13-023. c. Date Filed: March 2, 2009. d. Applicant: Green Island Power Authority. e. Name of Project: Green Island Hydroelectric Project...

  12. 77 FR 5786 - PacifiCorp; Notice of Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... January 12, 2012. d. Applicant: PacifiCorp. e. Name of Project: Granite Hydroelectric Project. f. Location: The proposed Granite Project would be located on a water supply pipeline in Salt Lake County, Utah... serve a copy of the document on that resource agency. l. Description of Project: The Granite Project...

  13. New data on species of Demidospermus (Dactylogyridae: Monogenea) parasitizing fishes from the reservoir of the Itaipu Hydroelectric Power Station, Paraná State, Brazil, with new synonymies.

    PubMed

    Cohen, Simone C; Kohn, Anna

    2008-01-01

    Eight known species of Demidospermus (Dactylogyridae, Monogenea) were collected from siluriform fishes from reservoir of the Itaipu Hydroelectric Power Station, Paraná, Brazil. Four of them are recorded for the first time in Brazil, enlarging their geographical distribution: Demidospermus armostus, Demidospermus anus, Demidospermus bidiverticulatum and Demidospermus valenciennesi. Demidospermus labrosi is synonymized with Demidospermus cornicinus and Demidospermus mandi with Demidospermus leptosynophallus and reported from two new hosts. Demidospermus paravalenciennesi and Demidospermus uncusvalidus were also collected.

  14. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fischer, Steve; McCarty, Patrick

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage sincemore » the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.« less

  15. 78 FR 21921 - Duke Energy Carolinas, LLC; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2603-024] Duke Energy...: Duke Energy Carolinas, LLC. e. Name of Project: Franklin Hydroelectric Project. f. Location: The... Contact: Dennis Whitaker, Duke Energy--Lake Services, 526 S. Church St., Charlotte, NC, 28202, (704) 382...

  16. 76 FR 8722 - California Department of Water Resources; Notice of Application Accepted for Filing, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... Department of Water Resources; Notice of Application Accepted for Filing, Soliciting Comments, Motions To... Water Resources (DWR). e. Name of Project: Feather River Hydroelectric Project. f. Location: The project.... k. Description of Request: The California Department of Water Resources, licensee for the Feather...

  17. 78 FR 10615 - Westfield Water Resources Department; Notice of Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Water Resources Department. e. Name of Project: Sackett Filtration Plant Hydroelectric Project. f.... 791a-825r h. Applicant Contact: Mr. Charles Darling, Water Systems Engineer, Westfield Water Resources... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14483-000] Westfield Water...

  18. 78 FR 11169 - Virginia Hydrogeneration and Historical Society's, L.C.; Notice of Termination of License by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8657-064] Virginia Hydrogeneration and Historical Society's, L.C.; Notice of Termination of License by Implied Surrender and... Hydrogeneration and Historical Society's, L.C. e. Name and Location of Project: The Harvell Hydroelectric Project...

  19. Atmospheric nitrogen deposition budget in a subtropical hydroelectric reservoir (Nam Theun II case study, Lao PDR)

    NASA Astrophysics Data System (ADS)

    Adon, Marcellin; Galy-Lacaux, Corinne; Serça, Dominique; Guerin, Frederic; Guedant, Pierre; Vonghamsao, Axay; Rode, Wanidaporn

    2016-04-01

    With 490 km² at full level of operation, Nam Theun 2 (NT2) is one of the largest hydro-reservoir in South East Asia. NT2 is a trans-basin hydropower project that diverts water from the Nam Theun river (a Mekong tributary) to the Xe Ban Fai river (another Mekong tributary). Atmospheric deposition is an important source of nitrogen (N), and it has been shown that excessive fluxes of N from the atmosphere has resulted in eutrophication of many coastal waters. A large fraction of atmospheric N input is in the form of inorganic N. This study presents an estimation of the atmospheric inorganic nitrogen budget into the NT2 hydroelectric reservoir based on a two-year monitoring (July 2010 to July 2012) including gas concentrations and precipitation. Dry deposition fluxes are calculated from monthly mean surface measurements of NH3, HNO3 and NO2 concentrations (passive samplers) together with simulated deposition velocities, and wet deposition fluxes from NH4+ and NO3- concentrations in single event rain samples (automated rain sampler). Annual rainfall amount was 2500 and 3160 mm for the two years. The average nitrogen deposition flux is estimated at 1.13 kgN.ha-1.yr-1 from dry processes and 5.52 kgN.ha-1.yr-1 from wet ones, i.e., an average annual total nitrogen flux of 6.6 kgN.ha-1.yr-1 deposited into the NT2 reservoir. The wet deposition contributes to 83% of the total N deposition. The nitrogen deposition budget has been also calculated over the rain tropical forest surrounding the reservoir. Due to higher dry deposition velocities above forested ecosystems, gaseous dry deposition flux is estimated at 4.0 kgN.ha-1.yr-1 leading to a total nitrogen deposition about 9.5 kgN.ha-1.yr-1. This result will be compared to nitrogen deposition in the African equatorial forested ecosystems in the framework of the IDAF program (IGAC-DEBITS-AFrica).

  20. Categorization of the trophic status of a hydroelectric power plant reservoir in the Brazilian Amazon by statistical analyses and fuzzy approaches.

    PubMed

    da Costa Lobato, Tarcísio; Hauser-Davis, Rachel Ann; de Oliveira, Terezinha Ferreira; Maciel, Marinalva Cardoso; Tavares, Maria Regina Madruga; da Silveira, Antônio Morais; Saraiva, Augusto Cesar Fonseca

    2015-02-15

    The Amazon area has been increasingly suffering from anthropogenic impacts, especially due to the construction of hydroelectric power plant reservoirs. The analysis and categorization of the trophic status of these reservoirs are of interest to indicate man-made changes in the environment. In this context, the present study aimed to categorize the trophic status of a hydroelectric power plant reservoir located in the Brazilian Amazon by constructing a novel Water Quality Index (WQI) and Trophic State Index (TSI) for the reservoir using major ion concentrations and physico-chemical water parameters determined in the area and taking into account the sampling locations and the local hydrological regimes. After applying statistical analyses (factor analysis and cluster analysis) and establishing a rule base of a fuzzy system to these indicators, the results obtained by the proposed method were then compared to the generally applied Carlson and a modified Lamparelli trophic state index (TSI), specific for trophic regions. The categorization of the trophic status by the proposed fuzzy method was shown to be more reliable, since it takes into account the specificities of the study area, while the Carlson and Lamparelli TSI do not, and, thus, tend to over or underestimate the trophic status of these ecosystems. The statistical techniques proposed and applied in the present study, are, therefore, relevant in cases of environmental management and policy decision-making processes, aiding in the identification of the ecological status of water bodies. With this, it is possible to identify which factors should be further investigated and/or adjusted in order to attempt the recovery of degraded water bodies. Copyright © 2014 Elsevier B.V. All rights reserved.

  1. 75 FR 74700 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 2183-078] Grand River Dam... Dam Authority. e. Name of Project: Markham Ferry Hydroelectric Project. f. Location: The project is..., Grand River Dam Authority, P.O. Box 409, Vinita, Oklahoma 74301-0409, (918) 256-5545 or by e-mail...

  2. 78 FR 44105 - Monroe Hydro, LLC; Notice of Intent to File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14430-000] Monroe Hydro... Application and Request to Use the Traditional Licensing Process. b. Project No.: 14430-000 c. Date Filed: April 2, 2013 d. Submitted By: Monroe Hydro, LLC e. Name of Project: Monroe Drop Hydroelectric Project f...

  3. 76 FR 54766 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...

  4. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  5. Assessing fish predation on migrating juvenile steelhead and a retrospective comparison to steelhead survival through the Priest Rapids Hydroelectric Project, Columbia River, Washington, 2009-11

    USGS Publications Warehouse

    Hardiman, Jill M.; Counihan, Timothy D.; Burgess, Dave S.; Simmons, Katrina E.; Holmberg, Glen S.; Rogala, Josh; Polacek, Rochelle

    2012-01-01

    The U.S. Geological Survey (USGS) and the Washington Department of Fish and Wildlife (WDFW) have been working with the Public Utility District No. 2 of Grant County, Washington (Grant PUD), to increase their understanding of predator-prey interactions in the Priest Rapids Hydroelectric Project (PRP), Columbia River, Washington. For this study, the PRP is defined as the area approximately 6 kilometers upstream of Wanapum Dam to the Priest Rapids Dam tailrace, 397.1 miles from the mouth of the Columbia River. Past year’s low survival numbers of juvenile steelhead (Oncorhynchus mykiss) through Wanapum and Priest Rapids Dams has prompted Grant PUD, on behalf of the Priest Rapids Coordinating Committee, to focus research efforts on steelhead migration and potential causal mechanisms for low survival. Steelhead passage survival in 2009 was estimated at 0.944 through the Wanapum Development (dam and reservoir) and 0.881 through the Priest Rapids Development and for 2010, steelhead survival was 0.855 for Wanapum Development and 0.904 for Priest Rapids Development. The USGS and WDFW implemented field collection efforts in 2011 for northern pikeminnow (Ptychocheilus oregonensis), smallmouth bass (Micropterus dolomieu), and walleye (Sander vitreus, formerly Stizostedion vitreum) and their diets in the PRP. For predator indexing, we collected 948 northern pikeminnow, 237 smallmouth bass, 18 walleye, and two largemouth bass (Micropterus salmoides). The intent of this study was to provide standardized predation indices within individual reaches of the PRP to discern spatial variability in predation patterns. Furthermore, the results of the 2011 study were compared to results of a concurrent steelhead survival study. Our results do not indicate excessively high predation of Oncorhynchus spp. occurring by northern pikeminnow or smallmouth bass in any particular reach throughout the study area. Although we found Oncorhynchus spp. in the predator diets, the relative

  6. 75 FR 47808 - Alabama Municipal Electric Authority; Notice of Competing Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ..., proposing to study the feasibility of the George W. Andrews Lock and Dam Hydroelectric Project. The proposed project would be located at the existing George W. Andrews Lock and Dam on the Chattahoochee River in...

  7. 75 FR 28000 - Cellu Tissue Corporation; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2851-016] Cellu Tissue..., 2010. d. Applicant: Cellu Tissue Corporation. e. Name of Project: Natural Dam Hydroelectric Project. f.... h. Agent Contact: Chris Fiedler or Robin Gaumes, Cellu Tissue Corp., Natural Dam Mill, 4921 Route...

  8. 78 FR 21920 - Duke Energy Carolinas, LLC; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... required by article 407 of the July 22, 2011 license, Duke Energy Carolinas, LLC requests Commission... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2601-021] Duke Energy...: Duke Energy Carolinas, LLC. e. Name of Project: Bryson Hydroelectric Project. f. Location: The Bryson...

  9. 78 FR 38026 - Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Alabama Power, Inc.; Supplement to Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... Impact Statement (draft EIS) for the Martin Dam Hydroelectric Project No. 349- 173 (Martin Dam Project...

  10. 77 FR 62500 - Peabody Trout Creek Reservoir LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14446-000] Peabody Trout.... c. Dated Filed: August 9, 2012. d. Submitted By: Peabody Trout Creek Reservoir LLC. e. Name of Project: Trout Creek Reservoir Hydroelectric Project. f. Location: On Trout Creek, 15 miles southwest of...

  11. Cumulative impact assessment: A case study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irving, J.S.; Bain, M.B.

    The National Environmental Policy Act of 1969 (NEPA) indirectly addressed cumulative impacts. Attempts to include cumulative impacts in environmental impact assessments, however, did not began until the early 1980's. One such effort began when The Federal Energy and Regulatory Commission (FERC) received over 1200 applications for hydroelectric projects in the Pacific Northwest. Federal and State Agencies, Indian tribes and environmental groups realized the potential cumulative effect such development could have on fish and wildfire resources. In response, the FERC developed the Cluster Impact Assessment Procedure (CIAP). The CIAP consisted of public scoping meetings; interactive workshops designed to identify projects withmore » potential for cumulative effects, important resources, available data; and preparation of a NEPA document (EA or EIS). The procedure was modifies to assess the cumulative impacts of fifteen hydroelectric projects in the Salmon River Basin, Idaho. The methodology achieved its basic objective of evaluating the impact of hydroelectric development on fish and wildfire resources. In addition, the use of evaluative techniques to determine project interactions and degrees of impact hindered acceptance of the conclusions. Notwithstanding these problems, the studies provided a basis for decision-makers to incorporate the potential effects of cumulative impacts into the decision-making process. 22 refs., 2 figs., 4 tabs.« less

  12. 75 FR 47585 - Jonathan and Jayne Chase; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    .... e. Name of Project: Troy Hydroelectric Project. f. Location: On the Missisquoi River, in the Town of Troy, Orleans County, Vermont. The project would not occupy lands of the United States. g. Filed... application is not ready for environmental analysis at this time. n. The Troy Project would consist of: (1...

  13. 78 FR 49749 - Southern California Edison, City of Banning, California; Notice of Meeting To Conduct a Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 344-023-California; Project No. 14520-000-California] Southern California Edison, City of Banning, California; Notice of Meeting To Conduct a Technical Conference for the San Gorgonio Hydroelectric Project and the Proposed Whitewater Flume Water Power Project a. Date and Time...

  14. 75 FR 36384 - City and Borough of Sitka; Notice Soliciting Scoping Comments for an Applicant Prepared...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13234-001] City and Borough... b. Project No.: 13234-001 c. Applicant: City and Borough of Sitka d. Name of Project: Takatz Lake Hydroelectric Project e. Location: On the Takatz Lake and Takatz Creek, approximately 20 miles east of the City...

  15. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  16. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  17. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  18. 18 CFR 4.95 - Surrender of exemption.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...

  19. 78 FR 17389 - Clark Canyon Hydro, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-009] Clark Canyon...: 12429-009. c. Date Filed: January 28, 2013. d. Applicant: Northwest Power Services on behalf of Clark Canyon Hydro, LLC. e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: The Clark...

  20. 77 FR 36531 - Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13315-001] Yegua Mesa Hydro... Intervene, and Competing Applications On May 2, 2012, Yegua Mesa Hydro, LLC, filed an application for a... studying the feasibility of the Yegua Mesa Pumped Storage Hydroelectric Project (Yegua Mesa Project or...

  1. Flood Frequency Analysis Under Non-stationarity Conditions: the Case of Southern Brazilian Hydroelectric Power Plants

    NASA Astrophysics Data System (ADS)

    Bartiko, Daniel; Chaffe, Pedro; Bonumá, Nadia

    2017-04-01

    Floods may be strongly affected by climate, land-use, land-cover and water infrastructure changes. However, it is common to model this process as stationary. This approach has been questioned, especially when it involves estimate of the frequency and magnitude of extreme events for designing and maintaining hydraulic structures, as those responsible for flood control and dams safety. Brazil is the third largest producer of hydroelectricity in the world and many of the country's dams are located in the Southern Region. So, it seems appropriate to investigate the presence of non-stationarity in the affluence in these plants. In our study, we used historical flood data from the Brazilian National Grid Operator (ONS) to explore trends in annual maxima in river flow of the 38 main rivers flowing to Southern Brazilian reservoirs (records range from 43 to 84 years). In the analysis, we assumed a two-parameter log-normal distribution a linear regression model was applied in order to allow for the mean to vary with time. We computed recurrence reduction factors to characterize changes in the return period of an initially estimated 100 year-flood by a log-normal stationary model. To evaluate whether or not a particular site exhibits positive trend, we only considered data series with linear regression slope coefficients that exhibit significance levels (p<0,05). The significance level was calculated using the one-sided Student's test. The trend model residuals were analyzed using the Anderson-Darling normality test, the Durbin-Watson test for the independence and the Breusch-Pagan test for heteroscedasticity. Our results showed that 22 of the 38 data series analyzed have a significant positive trend. The trends were mainly in three large basins: Iguazu, Uruguay and Paranapanema, which suffered changes in land use and flow regularization in the last years. The calculated return period for the series that presented positive trend varied from 50 to 77 years for a 100 year

  2. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  3. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as

  4. 78 FR 6314 - Monadnock Paper Mills, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Mills, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests... Mills, Inc. e. Name of Project: Monadnock Hydroelectric Project. f. Location: The existing project is..., Monadnock Paper Mills, Inc.; Antrim Road, P.O. Box 339, Bennington, NH 03442; (603) 588-3311 or [email protected

  5. 77 FR 73636 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14345-001] Rock River Beach.... c. Date filed: November 23, 2012. d. Applicant: Rock River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the Rock River, in the Town of Onota, Alger County...

  6. 77 FR 2966 - Rock River Beach, Inc.; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14345-000] Rock River Beach.... c. Filing Date: January 5, 2012. d. Applicant: Rock River Beach, Inc. e. Name of Project: Rock River Beach Hydroelectric Project. f. Location: On the Rock River, in the Township of Onota, Alger County...

  7. 77 FR 59921 - Wisconsin Public Service Corporation; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1940-000 Wisconsin; Project No. 1966-000 Wisconsin] Wisconsin Public Service Corporation; Notice of Environmental Site Review In anticipation of the filing of Notices of Intent (NOI) and Pre- Application Documents for the Grandfather Falls Hydroelectric Project No. 1966 and...

  8. 75 FR 26220 - Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157-188] Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Draft Environmental Assessment May 4... Hydroelectric Project (FERC Project No. 2157-188), located on the Sultan River 20 miles east of the city of...

  9. 75 FR 69433 - Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157-188] Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Final Environmental Assessment November 4... Hydroelectric Project (FERC Project No. 2157-188), located on the Sultan River 20 miles east of the city of...

  10. 75 FR 37429 - Pacific Gas and Electric Company; Notice of Availability of the Draft Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... the Kilarc-Cow Creek Hydroelectric Project and Announcing Intention To Hold Public Meeting June 22... of the Kilarc-Cow Creek Project (FERC No. 606) license. The project is located on Old Cow Creek, South Cow Creek, and tributaries in Shasta County, California. Commission staff has prepared a Draft...

  11. 77 FR 51993 - Western Technical College; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... hydroelectric generation at the dam. The dam is operated manually in a run-of-river mode (i.e., an operating...) distribution line; and (5) appurtenant facilities. The project would be operated in a run-of-river mode using... could otherwise enter project waters or adjacent non-project lands; Operating the project in a run-of...

  12. 76 FR 40722 - Pacific Green Power, LLC; Notice Of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ...), proposing to study the feasibility of the Two Girls Creek Hydroelectric Project (Two Girls Creek Project or project) to be located on Two Girls Creek, near Sweet Home, Linn County, Oregon. The project would occupy...-diameter HDPE tailrace returning flows to Two Girls Creek above a natural fish barrier; and (5) a new 12...

  13. Analysis of environmental issues related to small-scale hydroelectric development IV: fish mortality resulting from turbine passage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turbak, S. C.; Reichle, D. R.; Shriner, C. R.

    1981-01-01

    This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner)more » has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.« less

  14. Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

    USGS Publications Warehouse

    Duda, Jeffrey J.; Beirne, Matt M.; Warrick, Jonathan A.; Magirl, Christopher S.

    2018-04-16

    After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

  15. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    PubMed Central

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-01-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site. PMID:8044233

  16. Case Study and Numerical Analysis of Vibration and Runner Cracks for the Lipno I Hydroelectric Project

    NASA Astrophysics Data System (ADS)

    Zouhar, J.; Obrovsky, J.; Feilhauer, M.; Skotak, A.

    2016-11-01

    The refurbishment of the Lipno I TG2 Francis turbine, situated on River Vltava, with maximum net head of 165 m and required operational range from 0 to 67MW of turbine power was performed in 2014. The new hydraulic design of the spiral case, distributor and runner was developed for this project. After about 1000 hours of operation the site inspection was performed and the cracks were found on 8 runner blades of 17 blades altogether. The all cracks were found near runner hub beginning from the trailing edge. The dimensions of the cracks were different with maximum length of 123 mm and minimum length of 3 mm. The runner was repaired and the intensive investigation was started to define the main cause of the cracks creation and to determine the measures for their elimination. This paper presents the program of this investigation which consists of static and dynamic blade strain measurement, CFD and FEM analysis, discusses the crack causes and overview the solution how to return the turbine successfully to operation.

  17. 78 FR 58301 - Go With the Flow Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14538-000] Go With the Flow..., Motions To Intervene, and Competing Applications On July 22, 2013, Go with the Flow Hydro Power, LLC...), proposing to study the feasibility of the Go with the Flow Hydroelectric Project (project) to be located on...

  18. 18 CFR 4.94 - Standard terms and conditions of exemption.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...

  19. 18 CFR 4.94 - Standard terms and conditions of exemption.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...

  20. 18 CFR 4.94 - Standard terms and conditions of exemption.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...

  1. 76 FR 50726 - Riverbank Hydro No. 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... (FPA), proposing to study the feasibility of the Tuttle Creek Hydroelectric Project (Tuttle Creek Project or project) to be located at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam, on Big Blue River, near Manhattan, Riley County, Kansas. The sole purpose of a preliminary permit, if issued...

  2. 78 FR 70588 - STP Nuclear Operating Company; South Texas Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ... efficiency; (8) wind power; (9) solar power; (10) hydroelectric power; (11) ocean wave and current energy... generic environmental impact statement for license renewal of nuclear plants; issuance. SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has published the final, plant-specific...

  3. 76 FR 1149 - Eagle Crest Energy Company; Notice of Availability of the Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13123-002--California] Eagle Crest Energy Company; Notice of Availability of the Draft Environmental Impact Statement for the Eagle Mountain Pumped Storage Hydroelectric Project and Notice of Public Meetings December 23, 2010. In...

  4. 76 FR 51026 - Duke Energy Carolinas, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... Highway, Seneca, SC 29672. 29223-4905. Rebekah Dobrasko, South Carolina Tyler B. Howe, Eastern Band of... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2503-147--South Carolina and North Carolina Keowee- Toxaway Hydroelectric Project] Duke Energy Carolinas, LLC; Notice of...

  5. 77 FR 74845 - AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14115-001] AJT Mining Properties, Inc.; Notice of Surrender of Preliminary Permit Take notice that AJT Mining Properties, Inc., permittee for the proposed Yeldagalga Creek Hydroelectric Project, has requested that its preliminary permit...

  6. 77 FR 58366 - Tacoma Power; Errata Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 460-066] Tacoma Power; Errata Notice On September 11, 2012, the Commission issued a Notice of Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests for the Cushman Hydroelectric Project...

  7. 77 FR 55466 - Barren River Lake Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13022-003] Barren River Lake Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric..., 2012. d. Applicant: Barren River Lake Hydro LLC (Barren River Hydro). e. Name of Project: Barren River...

  8. 78 FR 19477 - Freedom Falls, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14421-000--ME] Freedom Falls, LLC; Notice of Availability of Environmental Assessment In accordance with the National... from licensing for the Freedom Falls Hydroelectric Project, to be located on Sandy Stream, in the Town...

  9. 76 FR 27310 - Janet A. Boyd, Boyd Hydro, LLC; Notice of Application for Transfer of License, and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7269-028] Janet A. Boyd... Intervene On March 25, 2011, Janet A. Boyd (transferor) and Boyd Hydro, LLC (transferee) filed an... Jim Boyd Hydroelectric Project from transferor to transferee. Applicants' Contact: Transferor: Janet A...

  10. Distribution of Major and Trace Elements in a Tropical Hydroelectric Reservoir in Sarawak, Malaysia.

    PubMed

    Sim, Siong Fong; Ling, Teck Yee; Nyanti, Lee; Ean Lee, Terri Zhuan; Mohd Irwan Lu, Nurul Aida Lu; Bakeh, Tomy

    2014-01-01

    This paper reports the metals content in water, sediment, macroalgae, aquatic plant, and fish of Batang Ai Hydroelectric Reservoir in Sarawak, Malaysia. The samples were acid digested and subjected to atomic absorption spectrometry analysis for Na, K, Mn, Cr, Ni, Zn, Mg, Fe, Sn, Al, Ca, As, Se, and Hg. The total Hg content was analysed on the mercury analyser. Results showed that metals in water, sediment, macroalgae, aquatic plant, and fish are distinguishable, with sediment and biota samples more susceptible to metal accumulation. The distributions of heavy metals in water specifically Se, Sn, and As could have associated with the input of fish feed, boating, and construction activities. The accumulation of heavy metals in sediment, macroalgae, and aquatic plant on the other hand might be largely influenced by the redox conditions in the aquatic environment. According to the contamination factor and the geoaccumulation index, sediment in Batang Ai Reservoir possesses low risk of contamination. The average metal contents in sediment and river water are consistently lower than the literature values reported and well below the limit of various guidelines. For fishes, trace element Hg was detected; however, the concentration was below the permissible level suggested by the Food and Agriculture Organization.

  11. Distribution of Major and Trace Elements in a Tropical Hydroelectric Reservoir in Sarawak, Malaysia

    PubMed Central

    Nyanti, Lee; Ean Lee, Terri Zhuan; Mohd Irwan Lu, Nurul Aida Lu

    2014-01-01

    This paper reports the metals content in water, sediment, macroalgae, aquatic plant, and fish of Batang Ai Hydroelectric Reservoir in Sarawak, Malaysia. The samples were acid digested and subjected to atomic absorption spectrometry analysis for Na, K, Mn, Cr, Ni, Zn, Mg, Fe, Sn, Al, Ca, As, Se, and Hg. The total Hg content was analysed on the mercury analyser. Results showed that metals in water, sediment, macroalgae, aquatic plant, and fish are distinguishable, with sediment and biota samples more susceptible to metal accumulation. The distributions of heavy metals in water specifically Se, Sn, and As could have associated with the input of fish feed, boating, and construction activities. The accumulation of heavy metals in sediment, macroalgae, and aquatic plant on the other hand might be largely influenced by the redox conditions in the aquatic environment. According to the contamination factor and the geoaccumulation index, sediment in Batang Ai Reservoir possesses low risk of contamination. The average metal contents in sediment and river water are consistently lower than the literature values reported and well below the limit of various guidelines. For fishes, trace element Hg was detected; however, the concentration was below the permissible level suggested by the Food and Agriculture Organization. PMID:27437493

  12. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... excessive siltation, erosion, rapid dewatering, or exposure to high wind, wave, or current action and/or in..., hydro-electric power stations, work areas, water intake structures, etc. No shoreline use permits will... costs, one year permits should be issued only when the location or nature of the activity requires...

  13. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  14. 75 FR 26749 - Public Utility District No.1 of Snohomish County, WA; Notice of Technical Conference for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157-188] Public Utility District No.1 of Snohomish County, WA; Notice of Technical Conference for the Jackson Hydroelectric Project.... Commission staff will hold a technical conference to discuss the proposed license articles submitted by the...

  15. 76 FR 72197 - Yuba County Water Agency; Notice of Panel Meeting and Technical Conference Details

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2246-058] Yuba County Water... for the Yuba County Water Agency's (YCWA) Yuba River Hydroelectric Project No. 2246. NMFS disputed the... for anadromous fish; (2) hydrology for anadromous fish; (3) water temperatures for anadromous fish...

  16. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13819-000] Verde Hydro, LLC... Intervene, and Competing Applications August 2, 2010. On July 21, 2010, Verde Hydro, LLC filed an... the feasibility of the Verde Hydroelectric Project, located in Maricopa County, in the State of...

  17. 77 FR 1924 - Middlebury Electric, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ...-001] Middlebury Electric, LLC; Notice of Intent To File License Application, Filing of Pre-Application...: Middlebury Electric, LLC. e. Name of Projects: Middlebury Upper Hydroelectric Project and Middlebury Upper...: Alders Holm, Middlebury Electric, LLC, 5 Frog Hollow Alley, Middlebury, VT 05753; (802) 388- 7037. i...

  18. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; McKay Dam Hydropower, LLC On May 31, 2011, McKay Dam Hydropower, LLC filed an... study the feasibility of the McKay Dam Hydroelectric Project (project) to be located at the McKay dam near Pendleton in Umatilla County, [[Page 57732

  19. 75 FR 61458 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-386] Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and... August 16, 2010. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Hydroelectric...

  20. 77 FR 29622 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ..., LLC (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bossier Parish, near the Town of Ninock, Louisiana. The proposed...

  1. 77 FR 29623 - Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ..., LLC (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing U. S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. The proposed...

  2. 75 FR 37431 - Pacific Gas & Electric Co.; Notice of Public Meeting on Draft Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ...-Cow Creek Hydroelectric Project (FERC Project No. 606-027). In addition to or in lieu of sending... comments on the Draft EIS. The time and location of this public meeting is as follows: Kilarc-Cow Creek... application for the Kilarc-Cow Creek Project. The Draft EIS was issued and publicly noticed on June 22, 2010...

  3. DEVELOPMENT OF THE PRIEST RAPIDS TURBINE UPGRADE PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeBolt, Donald; Richmond, Marshall C.; Donelson, Richard K.

    The Priest Rapids Dam is located on the Columbia River and is operated by Public Utility District No. 2 of Grant County, WA (GCPUD). In operation since 1959, GCPUD decided that a major upgrade was necessary. As with other hydroelectric facilities on the Columbia River, improving fish passage at Priest Rapids Dam is of great importance for salmon and steelhead populations in the Pacific Northwest. Consequently, GCPUD established the Priest Rapids Turbine Upgrade Project to extend the life of the units, increase efficiency and power production, and improve fish-passage. The Priest Rapids powerhouse is equipped with 10 vertical Kaplan turbinesmore » with runner diameters of 7.21 m operating under net heads varying from 18 m to 27 m. The scope of the project included a design competition involving three turbine manufacturers providing up to two designs for evaluation. Selection of the replacement design was determined by the lowest evaluated price based on model test results conducted at an independent laboratory (Ecole Polytechnique Federale de Lausanne in Lausanne Switzerland) and a biological performance score determined by a newly developed Biological Performance Assessment (BioPA) performed by Pacific Northwest National Laboratory in Richland, WA. In the paper, the hydraulic design challenges are reviewed, in addition to comparisons of designs evaluated during the competitive model test program and biological assessment. The paper also provides a description of the process followed by GCPUD, and how the evaluation criteria influenced the development and the finally selected solution.« less

  4. Design of an Adaptive Power Regulation Mechanism and a Nozzle for a Hydroelectric Power Plant Turbine Test Rig

    NASA Astrophysics Data System (ADS)

    Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team

    2014-11-01

    This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.

  5. An evaluation pattern for antimacrofouling procedures: Limnoperna fortunei larvae study in a hydroelectric power plant in South America.

    PubMed

    Darrigran, Gustavo; Damborenea, Cristina; Greco, Nancy

    2007-11-01

    The effects of global change and globalization of trade on the biosphere spur an increase in bioinvasions and their subsequent impact on ecosystems. Continental invading bivalves are important because of their impact on artificially-constructed structures. Limnoperna fortunei was first found in the Neotropical region in 1991. Since then it has dispersed upstream in the Plata and Guaíba basins at a rate of 240 km y(-1). This species causes macrofouling in a manner similar to that caused by Dreissena polymorpha. This paper describes the biology of L. fortunei larvae from a hydroelectric power plant in South America. We suggest the importance of knowing the biology of the invading species and the need to consider the settlement patterns and densities of larvae in each of the sectors of the facility in order to achieve a sustainable prevention/control of macrofouling. This study acquires a global significance under the assumption that L. fortunei will eventually invade North America and Europe.

  6. View of Irving Powerhouse. Looking across Fossil Creek (westsouthwest) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Irving Powerhouse. Looking across Fossil Creek (west-southwest) - Childs-Irving Hydroelectric Project, Irving System, Irving Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  7. 83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN OPERATION, LOOKING UPSTREAM, Print No. 274, June 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  8. 77 FR 50490 - Notice of Application Tendered for Filing with the Commission and Establishing Procedural...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-21

    ... Deadline for Submission of Final Amendments; Monadnock Paper Mills, Inc. Take notice that the following...: Monadnock Paper Mills, Inc. e. Name of Project: Monadnock Hydroelectric Project. f. Location: The existing..., Environmental Services, Monadnock Paper Mills, Inc.; Antrim Road, P.O. Box 339, Bennington, NH 03442; (603) 588...

  9. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments on the proposed water supply pipeline and the draft EIS. Additionally, as discussed below, we will be...

  10. 77 FR 55468 - Oliver Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13005-003] Oliver Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been... License. b. Project No.: P-13005-003. c. Date filed: December 14, 2011. d. Applicant: Oliver Hydro LLC. e...

  11. 78 FR 13870 - Roberto Sella; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI13-3-000] Roberto Sella... 7, 2012. d. Applicant: Roberto Sella. e. Name of Project: Hydro-electric and Geothermal Alternative Energy System at Paper Hill Farm (Paper Hill Farm). f. Location: The proposed Paper Hill Farm project...

  12. 78 FR 59923 - Cave Run Energy, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14376-001] Cave Run Energy...: July 21, 2013. d. Submitted By: Cave Run Energy, LLC. e. Name of Project: Cave Run Hydroelectric...: 18 CFR 5.3 of the Commission's regulations. h. Potential Applicant Contact: Mark Boumansour, Cave Run...

  13. Floristic and phytosociology in dense "terra firme" rainforest in the Belo Monte Hydroelectric Plant influence area, Pará, Brazil.

    PubMed

    Lemos, D A N; Ferreira, B G A; Siqueira, J D P; Oliveira, M M; Ferreira, A M

    2015-08-01

    The objective of the present study was to characterise the floristic and phytosociological composition on a stretch of dense "Terra Firme" rainforest located in the Belo Monte hydroelectric plant area of influence, located in the state of Pará, Brazil. All trees with DAP >10 cm situated in 75 permanent plots of 1 ha were inventoried. 27,126 individuals trees (361 ind.ha-1), distributed in 59 botanical families, comprising 481 species were observed. The families with the largest number of species were Fabaceae (94), Araceae (65) and Arecaceae (43), comprising 43.7% of total species. The species Alexa grandiflora (4.41), Cenostigma tocantinum (2.50) and Bertholletia excelsa (2.28) showed the highest importance values (IV). The ten species with greater IV are concentrated (22%). The forest community has high species richness and can be classified as diverse age trees, heterogeneous and of medium conservation condition.

  14. 18. VIEW OF SETTLING BASIN FROM UPSTREAM TRESTLE, SHOWING BULKHEAD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. VIEW OF SETTLING BASIN FROM UPSTREAM TRESTLE, SHOWING BULKHEAD ON RIGHT AND SAND BANK ON LEFT, LOOKING NORTHWEST - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  15. 14. INSIDE VIEW OF FLUME, LOOKING DOWNSTREAM TOWARD SETTLING BASIN, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. INSIDE VIEW OF FLUME, LOOKING DOWNSTREAM TOWARD SETTLING BASIN, SHOWING RIGHT FORK TO BYPASS, LEFT FORK TO BASIN - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  16. 81. VIEW OF CONNECTION BETWEEN INTAKE AND FLUME, SHOWING UNCOMPLETED ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    81. VIEW OF CONNECTION BETWEEN INTAKE AND FLUME, SHOWING UNCOMPLETED RADIAL GATE IN PLACE, Print No. 240, April 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  17. 65. VIEW LOOKING UPSTREAM FROM FLUME SUBSTRUCTURE, SHOWING COLUMBIA IMPROVEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    65. VIEW LOOKING UPSTREAM FROM FLUME SUBSTRUCTURE, SHOWING COLUMBIA IMPROVEMENT COMPANY'S NEISSON CREEK SAWMILL. Print No. 177, November 1903 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  18. 79. VIEW OF SPILLWAY THAT AUTOMATICALLY REGULATES HEIGHT OF WATER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    79. VIEW OF SPILLWAY THAT AUTOMATICALLY REGULATES HEIGHT OF WATER IN RESERVOIR, 'BACKWATER OVERFLOW,' Print No. 233, April 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  19. View of Pressure Tunnel Intake at Stehr Lake. Looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Pressure Tunnel Intake at Stehr Lake. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Pressure Tunnel Intake, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  20. 78 FR 48667 - Western Minnesota Municipal Power Agency; Notice of Application Accepted for Filing, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Project: Red Rock Hydroelectric Project f. Location: The project is located at the U.S. Army Corps of Engineers Lake Red Rock Dam on the Des Moines River in Marion County, Iowa. g. Filed Pursuant to: Federal... Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371...

  1. Center stage in the Philippines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meade, W.

    1993-03-01

    At present, early 5,000 MW of private power capacity is operating or under development in the Philippines. Projects include oil- and coal-fired, geothermal, and hydroelectric projects under a variety of financing and ownership arrangements. If all projects and solicitations come to fruition, more than 80% of new capacity added through the year 2000 will be privately owned.

  2. Spatial and temporal abundance of three sylvatic yellow fever vectors in the influence area of the Manso hydroelectric power plant, Mato Grosso, Brazil.

    PubMed

    Ribeiro, A L M; Miyazaki, R D; Silva, M; Zeilhofer, P

    2012-01-01

    Human biting catches of sylvatic yellow fever (SYF) vectors were conducted at eight stations in the influence area of the Manso hydroelectric power plant (Central Brazil) in sampling campaigns every 2 mo from July 2000 to November 2001. In total, 206 individuals were captured and classified as one of three species important for the transmission of SYF in Mato Grosso state: Haemagogus (Haemagogus) janthinomys (Dyar, 1921); Haemagogus (Conopostegus) leucocelaenus (Dyar & Shannon, 1924); and Sabethes (Sabethoides) chloropterus (Humboldt, 1819). The highest vector abundance was observed during the rainy season (November through March) and SYF vectors were present in all sampling points throughout the year, mainly in riparian and shadowed transitional forests at shadowed ramps.

  3. Enhancement and management of eel fisheries affected by hydroelectric dams in New Zealand

    USGS Publications Warehouse

    Boubee, J.; Chisnall, B.; Watene, E.; Williams, E.; Roper, D.; Haro, A.

    2003-01-01

    Two freshwater anguillid eel species, Anguilla australis and A. dieffenbachia, form the basis of important traditional, recreational, and commercial fisheries in New Zealand. These fisheries have been affected by the damming of many of the major waterways for hydroelectric generation. To create fisheries in reservoirs that would be otherwise inaccessible, elvers have been transferred from the base of dams into habitats upstream. Operations in three catchments: the Patea River (Lake Rotorangi), Waikato River (eight reservoirs notably the two lowermost, lakes Karapiro and Arapuni), and Rangitaiki River (lakes Matahina and Aniwhenua) are discussed. In all reservoirs, the transfers have successfully established fishable populations within six years of the first transfers and, in Lake Arapuni eels have reached the marketable size of 220 g in less than four years. In comparison, it typically takes from 13 to 17 years before eel populations are fishable in the lower Waikato River where direct access to the sea is available. Telemetry and monitoring at the screens and tailraces of several power stations have been used to determine migration timing, triggers, and pathways of mature eels. Successful downstream transfer of mature migrating adults has been achieved by spillway opening and netting in headraces during rain events in autumn, but means of preventing eels from impinging and entraining at the intakes are still required. An integrated, catchment-wide management system will be required to ensure sustainability of the fisheries. ?? Copyright by the American Fisheries Society 2003.

  4. 58. VIEW OF CABLE INCLINE, LOCATED ON THE HILLSIDE BELOW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    58. VIEW OF CABLE INCLINE, LOCATED ON THE HILLSIDE BELOW THE FOREBAY (NORTHWEST OF FOREBAY), Print No. 156, August 1903 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  5. 63. PANORAMIC VIEW OF HEADWORKS FROM WEST SIDE OF RIVER, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. PANORAMIC VIEW OF HEADWORKS FROM WEST SIDE OF RIVER, LOOKING UPSTREAM, Prints No. 173, 174 and 175, November 1903 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  6. View of north wall (electrical panel), interior of Childs Powerhouse. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of north wall (electrical panel), interior of Childs Powerhouse. Looking east - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  7. 157. Detail of lightning arresters; looking west. Photo by Jet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    157. Detail of lightning arresters; looking west. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  8. Dynamics of Total Microcystin LR Concentration in Three Subtropical Hydroelectric Generation Reservoirs in Uruguay, South America.

    PubMed

    González-Piana, Mauricio; Fabián, Daniel; Piccardo, Andrea; Chalar, Guillermo

    2017-10-01

    This study analyzed the temporal dynamics of total microcystin LR concentrations between the years of 2012 and 2015 in the Bonete, Baygorria and Palmar hydroelectric generation reservoirs in the central region of the Negro River, Uruguay. The three reservoirs showed differents total microcystin LR concentration, with no significant differences among them. Over 20 sampling dates, the three reservoirs exhibited total microcystin LR concentrations on eight occasions that corresponded to a slight to moderate human health risk according to WHO guideline values for recreational waters. By determining the concentration of microcystin LR in cyanobacterial biomass, we identified cyanobacterial populations that occurred over time with varying degrees of toxin production (maximal 85.4 µg/mm 3 ). The microcystin LR concentration in Bonete was positively correlated with temperature (r = 0.587) and cyanobacterial biomass (r = 0.736), in Baygorria with cyanobacterial biomass (r = 0.521), and in Palmar with temperature (r = 0.500) and negatively correlated with ammonia (r = -0.492). Action is needed to reduce the presence of toxic cyanobacteria in these systems. A decrease in the use of agrochemicals and management changes in the reservoir basins could be successful long-term measures.

  9. 77 FR 14009 - Carbon Zero, LLC.; Notice of Application Tendered for Filing With the Commission, Intent To Waive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14308-001] Carbon Zero, LLC...: February 17, 2012. d. Applicant: Carbon Zero, LLC. e. Name of Project: Vermont Tissue Mill Hydroelectric.... 791(a)-825(r). h. Applicant Contact: William F. Scully, Carbon Zero, LLC., P.O. Box 338, North...

  10. 78 FR 71602 - Lock 12 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... Hydroelectric Project] Lock 12 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a... Hydro Partners, LLC, as the applicant for Project No. 13214-003, is invited to participate in... Kinloch, Lock 14 Hydro Partners, 414 South Wenzel St., Louisville, KY 40204. Any person on the official...

  11. 78 FR 63176 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... new ``y'' pipe intake off the existing 10-inch diameter water supply pipeline; (2) a new 12-foot-long... water supply pipeline; and (5) appurtenant facilities. The proposed project would have an estimated... 22 kW Orchard City Water Treatment Plant Hydroelectric Project would utilize Orchard City's water...

  12. 78 FR 12304 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...+ Hydro Friends Fund XLII, LLC. e. Name of Project: Braddock Locks and Dam Hydroelectric Project. f...\\ Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL...

  13. 76 FR 21886 - Xcel Energy; Notice of Application of Recreational Resources Management Plan Update for the St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2056-049] Xcel Energy; Notice of Application of Recreational Resources Management Plan Update for the St. Anthony Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the...

  14. 76 FR 18216 - Dominion Virginia Power/North Carolina Power; Notice of Availability of Shoreline Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2009-145] Dominion Virginia Power/North Carolina Power; Notice of Availability of Shoreline Management Plan Update for the Shoshone Falls Project and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been file...

  15. 77 FR 34033 - American River Power IX, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... generator; (3) a concrete tailrace releasing water into the river downstream of the dam; (4) a switchyard... study the feasibility of the Peoria Dam, Illinois--Hydroelectric Water Power Project (Peoria Dam Project...-long, 50-foot-wide, 55-foot-high powerhouse containing two horizontal Kaplan pit turbines each with a...

  16. Probabilistic streamflow forecasting for hydroelectricity production: A comparison of two non-parametric system identification algorithms

    NASA Astrophysics Data System (ADS)

    Pande, Saket; Sharma, Ashish

    2014-05-01

    This study is motivated by the need to robustly specify, identify, and forecast runoff generation processes for hydroelectricity production. It atleast requires the identification of significant predictors of runoff generation and the influence of each such significant predictor on runoff response. To this end, we compare two non-parametric algorithms of predictor subset selection. One is based on information theory that assesses predictor significance (and hence selection) based on Partial Information (PI) rationale of Sharma and Mehrotra (2014). The other algorithm is based on a frequentist approach that uses bounds on probability of error concept of Pande (2005), assesses all possible predictor subsets on-the-go and converges to a predictor subset in an computationally efficient manner. Both the algorithms approximate the underlying system by locally constant functions and select predictor subsets corresponding to these functions. The performance of the two algorithms is compared on a set of synthetic case studies as well as a real world case study of inflow forecasting. References: Sharma, A., and R. Mehrotra (2014), An information theoretic alternative to model a natural system using observational information alone, Water Resources Research, 49, doi:10.1002/2013WR013845. Pande, S. (2005), Generalized local learning in water resource management, PhD dissertation, Utah State University, UT-USA, 148p.

  17. Influence of peak flow changes on the macroinvertebrate drift downstream of a Brazilian hydroelectric dam.

    PubMed

    Castro, D M P; Hughes, R M; Callisto, M

    2013-11-01

    Successive daily peak flows from hydropower plants can disrupt aquatic ecosystems and alter the composition and structure of macroinvertebrates downstream. We evaluated the influence of peak flow changes on macroinvertebrate drift downstream of a hydroelectric plant as a basis for determining ecological flows that might reduce the disturbance of aquatic biota. The aim of this study was to assess the influence of flow fluctuations on the seasonal and daily drift patterns of macroinvertebrates. We collected macroinvertebrates during fixed flow rates (323 m3.s-1 in the wet season and 111 m3.s-1 in the dry season) and when peak flows fluctuated (378 to 481 m3.s-1 in the wet season, and 109 to 173 m3.s-1 in the dry season) in 2010. We collected 31,924 organisms belonging to 46 taxa in the four sampling periods. Taxonomic composition and densities of drifting invertebrates differed between fixed and fluctuating flows, in both wet and dry seasons, but family richness varied insignificantly. We conclude that macroinvertebrate assemblages downstream of dams are influenced by daily peak flow fluctuations. When making environmental flow decisions for dams, it would be wise to consider drifting macroinvertebrates because they reflect ecological changes in downstream biological assemblages.

  18. Wildlife and Wildlife Habitat Loss Assessment at Green Peter-Foster Project; Middle Fork Santiam River, Oregon, 1985 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noyes, J.H.

    1986-02-01

    A habitat based assessment was conducted of the US Army Corps of Engineers' Green Peter-Foster Dam and Reservoir Project on the Middle Fork Santiam River, Oregon, to determine losses or gains resulting from the development and operation of the hydroelectric related components of the project. Preconstruction, postconstruction, and recent vegetation cover types at the project site were mapped based on aerial photographs from 1955, 1972, and 1979, respectively. Vegetation cover types were identified within the affected area and acreages of each type at each period were determined. Eleven wildlife target species were selected to represent a cross-section of species groupsmore » affected by the project. An interagency team evaluated the suitability of the habitat to support the target species at each time period. An evaluation procedure which accounted for both the quantity and quality of habitat was used to aid in assessing impacts resulting from the project. The Green Peter-Foster Project extensively altered or affected 7873 acres of land and river in the Santiam River drainage. Impacts to wildlife centered around the loss of 1429 acres of grass-forb vegetation, 768 acres of shrubland, and 717 acres of open conifer forest cover types. Impacts resulting from the Green Peter-Foster Project included the loss of critical winter range for black-tailed deer and Roosevelt elk, and the loss of year-round habitat for deer, upland game birds, river otter, beaver, pileated woodpecker, and many other wildlife species. Bald eagle and osprey were benefited by an increase in foraging habitat. The potential of the affected area to support wildlife was greatly altered as a result of the Green Peter-Foster Project. Losses or gains in the potential of the habitat to support wildlife will exist over the life of the project.« less

  19. 62. Detail of bellmouth looking southeast. Photo by Robin Lee ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. Detail of bellmouth looking southeast. Photo by Robin Lee Tedder, Puget Power, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  20. View of Irving Intake System showing shed and steel flume. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Irving Intake System showing shed and steel flume. Looking west-northwest - Childs-Irving Hydroelectric Project, Irving System, Intake System, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  1. 53. VIEW OF PASSENGER SPEEDER 04 IN FOREGROUND, BOOM SPEEDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    53. VIEW OF PASSENGER SPEEDER 04 IN FOREGROUND, BOOM SPEEDER 75 IN BACKGROUND LEFT, AND BOOM SPEEDER 59 IN BACKGROUND RIGHT - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  2. View of Flume Bridge #4 showing flume and trestles. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Flume Bridge #4 showing flume and trestles. Looking northeast - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 4, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  3. View of Stand Pipe (Surge Tank) from FS 502. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Stand Pipe (Surge Tank) from FS 502. Looking northeast - Childs-Irving Hydroelectric Project, Childs System, Stand Pipe (Surge Tank), Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  4. What tools do we have to study the morphological effects of hydroelectric plants in developing countries? The Chilean case

    NASA Astrophysics Data System (ADS)

    Alcayaga, Hernan; Caamaño, Diego; Palma, Sebastian; Contreras, Karla

    2017-04-01

    Countries growing rates are directly related to energy production. Therefore, developed and developing nations are focused on hydropower and dam construction; on the contrary dam removal practices are significantly different among nations, demonstrating the former group a lesser interest on removing structures. Chiles hydropower generation corresponds to 50% of the current grid, having a potential capacity to double the current situation. Thus: ¿What tools can we apply to assess the potential impacts on our rivers? The goal of this project is to study two different reaches located in two separates streams in Central Chile. The Aconcagua River represents a mountain stream (i.e. steep, narrow, and confined) subject to the operation of a hydroelectric system composed by five diversion hydropower plants built during the 90`s. The Rapel River reach corresponds to the last 10km upstream to the outlet; it is a mild and wide stream that includes the gravel-sand transition. The Rapel dam operates about 25km upstream this second reach that is characterized by an 112m wall built in 1968. The Aconcagua hydropower system was characterized within a GIS environment and a morphological response conceptual model applied. The model uses two indexes to evaluate changes in i) channel forming discharge and ii) sediment supply. The provided response shows the trends and magnitudes of the changes, based in eighth possible directions for ten morphological responsible variables. The Rapel river system was evaluated differently and sampling of sediments characteristics (D50 and armour index), discharge index for both before and after the dam operation, Morphological Quality Index (IQM) and an analysis of aerial photography time series were performed. Results showed that the hydrology indicator impacts for the Aconcagua system were more severe than the impacts on sediments transport (typically the case for diversion type hydropower). A fine armour layer was found within the Rapel river site

  5. Total mercury distribution in different tissues of six species of freshwater fish from the Kpong hydroelectric reservoir in Ghana.

    PubMed

    Atta, Alhassan; Voegborlo, Ray Bright; Agorku, Eric Selorm

    2012-05-01

    Total mercury concentrations were determined in seven tissues of 38 fish samples comprising six species from the Kpong hydroelectric reservoir in Ghana by cold vapour atomic absorption spectrometry technique using an automatic mercury analyzer. Mercury concentration in all the tissues ranged from 0.005 to 0.022 μg/g wet weight. In general, the concentration of mercury in all the tissues were decreasing in the order; liver > muscle > intestine > stomach > gonad > gill > swim bladder. Mercury concentration was generally greater in the tissues of high-trophic-level fish such as Clarotes laticeps, Mormyrops anguilloides and Chrysichthys aurutus whereas low-trophic-level fish such as Oreochromis niloticus recorded low mercury concentration in their tissues. The results obtained for total mercury concentration in the muscle tissues analysed in this study are below the WHO/FAO threshold limit of 0.5 μg/g. This suggests that the exposure of the general public to Hg through fish consumption can be considered negligible.

  6. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Commission staff is consulting with the Louisiana State Historic Preservation Officer (Louisiana SHPO) and the Advisory Council on Historic Preservation (Advisory Council) pursuant to the Advisory Council's regulations, 36 CFR part 800, implementing section 106 of the National Historic Preservation Act, as amended...

  7. 78 FR 37210 - Parker Knoll Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Environmental Site Review Take notice that the following hydroelectric applications have been filed with Commission and are available for public inspection: a. Type of Application: New Major License. b. Project No.: 13239. c. Date...

  8. 77 FR 59607 - Black Canyon Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14110-001] Black Canyon Hydro, LLC; Notice of Environmental Site Review On Wednesday, October 3, 2012, at 3 p.m., Commission staff will be participating in an environmental site review for the proposed Black Canyon Hydroelectric Project. All interested participants should mee...

  9. Where Can You Buy a River?

    ERIC Educational Resources Information Center

    Coon-Come, Matthew

    1991-01-01

    Since 1975, Quebec hydroelectric projects have had negative impacts on the Cree hunting way of life and sacred sites, caused mercury contamination, and disrupted natural cycles of water and wildlife. Supported by contracts with New York State, new massive projects will destroy the six largest rivers in northwestern Quebec. (SV)

  10. 78 FR 71603 - Lock 14 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... Heidelberg Hydroelectric Project] Lock 14 Hydro Partners, LLC; Notice of Proposed Restricted Service List for... listed below. Lock 14 Hydro Partners, LLC, as the applicant for Project No. 13213-003, is invited to... Kinloch, Lock 14 Hydro Partners, 414 South Wenzel St., Louisville, KY 40204. Any person on the official...

  11. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...

  12. 78 FR 79434 - Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2305-036] Sabine River Authority of Texas and Sabine River Authority, State of Louisiana; Notice of Availability of the Final Environmental Impact Statement for the Toledo Bend Hydroelectric Project In accordance with the National Environmental Policy Act of 1969 and the...

  13. 77 FR 38620 - Idaho Power Company; Notice of Application for Amendment of License And Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Falls Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake... reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room 2A, Washington... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...

  14. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Hydroelectric Project. f. Location: The project is located in south-western Idaho on the Snake River from river... application is available for inspection and reproduction at the Commission's Public Reference Room, located at... available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be...

  15. 77 FR 38618 - Idaho Power Company; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... Falls Hydroelectric Project. f. Location: The project is located in south-central Idaho on the Snake... inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE., Room... inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the...

  16. 8. LONG VIEW OF CONCRETE FORBAY/SANDBOX FROM ENTRY POINT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. LONG VIEW OF CONCRETE FORBAY/SANDBOX FROM ENTRY POINT OF WATER CONVEYANCE SYSTEM. VIEW TO WEST. - Tule River Hydroelectric Project, Water Conveyance System, Middle Fork Tule River, Springville, Tulare County, CA

  17. 61. VIEW OF WAREHOUSE, MACHINE SHOP, AND HOISTING PLANT, WITH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    61. VIEW OF WAREHOUSE, MACHINE SHOP, AND HOISTING PLANT, WITH FOREBAY ON RIGHT IN FOREGROUND, Prints No. 158 and 159, August 1903 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA

  18. View of Steel Flume Bridge #2 crossing over wash. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Steel Flume Bridge #2 crossing over wash. Looking downstream, southwest - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 2, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  19. View of Sally May/Purple Mountain Siphon Intake. Looking southeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of Sally May/Purple Mountain Siphon Intake. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Sally May-Purple Mountain Siphon Intake, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  20. Closeup view of Flume Bridge #4 showing structural components. Looking ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Close-up view of Flume Bridge #4 showing structural components. Looking northeast - Childs-Irving Hydroelectric Project, Childs System, Flume Bridge No. 4, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ