30 CFR 90.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2013 CFR
2013-07-01
... performed to assure that the sampling devices are clean and in proper working condition by a person... voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and... sampling device to assure that it is clean and free of leaks; and (5) Examination of the clamping and...
30 CFR 90.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2014 CFR
2014-07-01
... performed to assure that the sampling devices are clean and in proper working condition by a person... voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and... sampling device to assure that it is clean and free of leaks; and (5) Examination of the clamping and...
30 CFR 90.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2012 CFR
2012-07-01
... performed to assure that the sampling devices are clean and in proper working condition by a person... voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and... sampling device to assure that it is clean and free of leaks; and (5) Examination of the clamping and...
30 CFR 90.203 - Certified person; maintenance and calibration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... COAL MINE SAFETY AND HEALTH MANDATORY HEALTH STANDARDS-COAL MINERS WHO HAVE EVIDENCE OF THE DEVELOPMENT OF PNEUMOCONIOSIS Sampling Procedures § 90.203 Certified person; maintenance and calibration. (a) Approved sampling devices shall be maintained and calibrated by a certified person. (b) To be certified, a...
Evaluation of a new simple collection device for sampling of microparticles in exhaled breath.
Seferaj, Sabina; Ullah, Shahid; Tinglev, Åsa; Carlsson, Sten; Winberg, Jesper; Stambeck, Peter; Beck, Olof
2018-03-12
The microparticle fraction of exhaled breath is of interest for developing clinical biomarkers. Exhaled particles may contain non-volatile components from all parts of the airway system, formed during normal breathing. This study aimed to evaluate a new, simple sampling device, based on impaction, for collecting microparticles from exhaled breath. Performance of the new device was compared with that of the existing SensAbues membrane filter device. The analytical work used liquid chromatography-tandem mass spectrometry methods. The new device collected three subsamples and these were separately analysed from eight individuals. No difference was observed between the centre position (0.91 ng/sample) and the side positions (1.01 ng/sample) using major phosphatidylcholine (PC) 16:0/16:0 as the analyte. Exhaled breath was collected from eight patients on methadone maintenance treatment. The intra-individual variability in measured methadone concentration between the three collectors was 8.7%. In another experiment using patients on methadone maintenance treatment, the sampling efficiency was compared with an established filter device. Compared to the existing device, the efficiency of the new device was 121% greater for methadone and 1450% greater for DPPC. The data from lipid analysis also indicated that a larger fraction of the collected material was from the distal parts. Finally, a study using an optical particle counter indicated that the device preferentially collects the larger particle fraction. In conclusion, this study demonstrates the usefulness of the new device for collecting non-volatile components from exhaled breath. The performance of the device was superior to the filter device in several aspects.
Sezdi, Mana
2016-01-01
A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.
Sezdi, Mana
2016-01-01
A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices. PMID:27195666
30 CFR 70.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the inner surface of the cyclone on the approved sampling device to assure that it is free of scoring; (4... leaks, and; (5) Examination of the clamping and positioning of the cyclone body, vortex finder and...
30 CFR 70.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2012 CFR
2012-07-01
... clean and in proper working condition by a person certified in accordance with § 70.202 (Certified... components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the...) Examination of the external tubing on the approved sampling device to assure that it is clean and free of...
30 CFR 70.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2013 CFR
2013-07-01
... clean and in proper working condition by a person certified in accordance with § 70.202 (Certified... components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the...) Examination of the external tubing on the approved sampling device to assure that it is clean and free of...
30 CFR 70.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2014 CFR
2014-07-01
... clean and in proper working condition by a person certified in accordance with § 70.202 (Certified... components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the...) Examination of the external tubing on the approved sampling device to assure that it is clean and free of...
Visagie, Surona; Eide, Arne H; Mannan, Hasheem; Schneider, Marguerite; Swartz, Leslie; Mji, Gubela; Munthali, Alister; Khogali, Mustafa; van Rooy, Gert; Hem, Karl-Gerhard; MacLachlan, Malcolm
2017-10-01
Purpose statement: The article explores assistive technology sources, services and outcomes in South Africa, Namibia, Malawi and Sudan. A survey was done in purposively selected sites of the study countries. Cluster sampling followed by random sampling served to identify 400-500 households (HHs) with members with disabilities per country. A HH questionnaire and individual questionnaire was completed. Country level analysis was limited to descriptive statistics. Walking mobility aids was most commonly bought/provided (46.3%), followed by visual aids (42.6%). The most common sources for assistive technology were government health services (37.8%), "other" (29.8%), and private health services (22.9%). Out of the participants, 59.3% received full information in how to use the device. Maintenance was mostly done by users and their families (37.3%). Devices helped a lot in 73.3% of cases and improved quality of life for 67.9% of participants, while 39.1% experienced functional difficulties despite the devices. Although there is variation between the study settings, the main impression is that of fragmented or absent systems of provision of assistive technology. Implications for rehabilitation Provision of assistive technology and services varied between countries, but the overall impression was of poor provision and fragmented services. The limited provision of assistive technology for personal care and handling products is of concern as many of these devices requires little training and ongoing support while they can make big functional differences. Rural respondents experienced more difficulties when using the device and received less information on use and maintenance of the device than their urban counterparts. A lack of government responsibility for assistive device services correlated with a lack of information and/or training of participants and maintenance of devices.
Liu, Shenglin; Zhang, Xutian; Wang, Guohong; Zhang, Qiang
2012-03-01
Based on specified demands on medical devices maintenance for clinical engineers and Browser/Server architecture technology, a medical device maintenance information platform was developed, which implemented the following modules such as repair, preventive maintenance, accessories management, training, document, system management and regional cooperation. The characteristics of this system were summarized and application in increase of repair efficiency, improvement of preventive maintenance and cost control was introduced. The application of this platform increases medical device maintenance service level.
Maintenance of head and neck tumor on-chip: gateway to personalized treatment?
Bower, Ruth; Green, Victoria L; Kuvshinova, Elena; Kuvshinov, Dmitriy; Karsai, Laszlo; Crank, Stephen T; Stafford, Nicholas D; Greenman, John
2017-01-01
Aim: Head and neck squamous cell carcinomas (HNSCC) are solid tumors with low overall survival (40–60%). In a move toward personalized medicine, maintenance of tumor biopsies in microfluidic tissue culture devices is being developed. Methodology/results: HNSCC (n = 15) was dissected (5–10 mg) and either analyzed immediately or cultured in a microfluidic device (37°C) for 48 h. No difference was observed in morphology between pre- and postculture specimens. Dissociated samples were analyzed using trypan blue exclusion (viability), propidium iodide flow cytometry (death) and MTS assay (proliferation) with no significant difference observed highlighting tissue maintenance. Computational fluid dynamics showed laminar flow within the system. Conclusion: The microfluidic culture system successfully maintained HNSCC for 48 h, the culture system will allow testing of different treatment modalities with response monitoring. PMID:28670466
Code of Federal Regulations, 2011 CFR
2011-10-01
... devices for new on-track roadway maintenance machines. 214.509 Section 214.509 Transportation Other... TRANSPORTATION RAILROAD WORKPLACE SAFETY On-Track Roadway Maintenance Machines and Hi-Rail Vehicles § 214.509 Required visual illumination and reflective devices for new on-track roadway maintenance machines. Each new...
30 CFR 71.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the inner surface of the cyclone on the approved sampling... positioning of the cyclone body, vortex finder and cassette to assure that they are rigid, in alignment, and...
30 CFR 90.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the inner surface of the cyclone on the approved sampling... positioning of the cyclone body, vortex finder and cassette to assure that they are rigid, in alignment, and...
30 CFR 71.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2011 CFR
2011-07-01
... voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and free of dust and dirt; (3) Examination of the inner surface of the cyclone on the approved sampling... positioning of the cyclone body, vortex finder and cassette to assure that they are rigid, in alignment, and...
40 CFR 63.2251 - What are the requirements for the routine control device maintenance exemption?
Code of Federal Regulations, 2010 CFR
2010-07-01
... the routine control device maintenance exemption? (a) You may request a routine control device..., explain why the maintenance cannot be accomplished during process shutdowns, describe how you plan to make... device is used to control a green rotary dryer, tube dryer, rotary strand dryer, or pressurized refiner...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiskoot, R.J.J.
Accurate and reliable sampling systems are imperative when confirming natural gas' commercial value. Buyers and sellers need accurate hydrocarbon-composition information to conduct fair sale transactions. Because of poor sample extraction, preparation or analysis can invalidate the sale, more attention should be directed toward improving representative sampling. Consider all sampling components, i.e., gas types, line pressure and temperature, equipment maintenance and service needs, etc. The paper discusses gas sampling, design considerations (location, probe type, extraction devices, controller, and receivers), operating requirements, and system integration.
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF DIESEL ENGINE STARTING ENGINES. TOPICS ARE (1) STARTING ENGINE MAGNETO (WICO), (2) MAGNETO MAINTENANCE, (3) SPARK PLUGS, (4) GENERAL DESCRIPTION (STARTING DEVICES), (5) OPERATING (STARTING DEVICES), (6) LUBRICATION (STARTING DEVICES), (7)…
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...
Sensor Measurement Strategies for Monitoring Offshore Wind and Wave Energy Devices
NASA Astrophysics Data System (ADS)
O'Donnell, Deirdre; Srbinovsky, Bruno; Murphy, Jimmy; Popovici, Emanuel; Pakrashi, Vikram
2015-07-01
While the potential of offshore wind and wave energy devices is well established and accepted, operations and maintenance issues are still not very well researched or understood. In this regard, scaled model testing has gained popularity over time for such devices at various technological readiness levels. The dynamic response of these devices are typically measured by different instruments during such scaled tests but agreed sensor choice, measurement and placement guidelines are still not in place. This paper compared the dynamic responses of some of these sensors from a scaled ocean wave testing to highlight the importance of sensor measurement strategies. The possibility of using multiple, cheaper sensors of seemingly inferior performance as opposed to the deployment of a small number of expensive and accurate sensors are also explored. An energy aware adaptive sampling theory is applied to highlight the possibility of more efficient computing when large volumes of data are available from the tested structures. Efficient sensor measurement strategies are expected to have a positive impact on the development of an device at different technological readiness levels while it is expected to be helpful in reducing operation and maintenance costs if such an approach is considered for the devices when they are in operation.
49 CFR 214.511 - Required audible warning devices for new on-track roadway maintenance machines.
Code of Federal Regulations, 2011 CFR
2011-10-01
... roadway maintenance machines. 214.511 Section 214.511 Transportation Other Regulations Relating to... SAFETY On-Track Roadway Maintenance Machines and Hi-Rail Vehicles § 214.511 Required audible warning devices for new on-track roadway maintenance machines. Each new on-track roadway maintenance machine shall...
49 CFR 214.511 - Required audible warning devices for new on-track roadway maintenance machines.
Code of Federal Regulations, 2010 CFR
2010-10-01
... roadway maintenance machines. 214.511 Section 214.511 Transportation Other Regulations Relating to... SAFETY On-Track Roadway Maintenance Machines and Hi-Rail Vehicles § 214.511 Required audible warning devices for new on-track roadway maintenance machines. Each new on-track roadway maintenance machine shall...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...
40 CFR 63.563 - Compliance and performance testing.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Standards for Marine Tank Vessel Loading Operations § 63.563 Compliance and performance testing. (a) The... indirectly, shall be secured closed during marine tank vessel loading operations either by using a car-seal... devices, sampling, and venting for maintenance. Marine tank vessel loading operations shall not be...
Batista, I C; Gomes, G J C; Teles, C S; Oliveira, P F; Santos, R M; Sassi, A C; Sá, B; V, B; Pardauil, A A
2012-01-01
This paper aims to present an ergonomic device to assist in the maintenance of the units of Tucuruí Hydropower Plant. The development of this ergonomic device made possible to reduce maintenance time, reduce losses caused by billing, improve performance and reduce the physical strain for labors during the execution of services.
30 CFR 90.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... pack multiplied by 1.25. The voltage for other than nickel cadmium cell batteries shall not be lower than the product of the number of cells in the battery pack multiplied by the manufacturer's nominal voltage per cell value; (2) Examination of all components of the cyclone to assure that they are clean and...
30 CFR 70.204 - Approved sampling devices; maintenance and calibration.
Code of Federal Regulations, 2010 CFR
2010-07-01
... battery pack multiplied by the manufacturer's nominal voltage per cell value; (2) Examination of all... calibrated at the flowrate of 2.0 liters of air per minute, or at a different flowrate as prescribed by the... than the product of the number of cells in the battery pack multiplied by 1.25. The voltage for other...
Evaluation of the Multi-Chambered Treatment Train, a retrofit water-quality management device
Corsi, Steven R.; Greb, Steven R.; Bannerman, Roger T.; Pitt, Robert E.
1999-01-01
This paper presents the results of an evaluation of the benefits and efficiencies of a device called the Multi-Chambered Treatment Train (MCTT), which was installed below the pavement surface at a municipal maintenance garage and parking facility in Milwaukee, Wisconsin. Flow-weighted water samples were collected at the inlet and outlet of the device during 15 storms, and the efficiency of the device was based on reductions in the loads of 68 chemical constituents and organic compounds. High reduction efficiencies were achieved for all particulate-associated constituents, including total suspended solids (98 percent), total phosphorus (88 percent), and total recoverable zinc (91 percent). Reduction rates for dissolved fractions of the constituents were substantial, but somewhat lower (dissolved solids, 13 percent; dissolved phosphorus, 78 percent; dissolved zinc, 68 percent). The total dissolved solids load, which originated from road salt storage, was more than four times the total suspended solids load. No appreciable difference was detected between particle-size distributions in inflow and outflow samples.
Nelson, Clay M; Gilmore, Thomas M; Harrington, M; Scheckel, Kirk G; Miller, Bradley W; Bradham, Karen D
2013-03-01
The U.S. EPA's in vitro bioaccessibility (IVBA) method 9200.1-86 defines a validated analytical procedure for the determination of lead bioaccessibility in contaminated soils. The method requires the use of a custom-fabricated extraction device that uses a heated water bath for sample incubation. In an effort to improve ease of use, increase sample throughput, and reduce equipment acquisition and maintenance costs, an alternative low-cost, commercially available extraction device capable of sample incubation via heated air and end-over-end rotation was evaluated. An intra-laboratory study was conducted to compare lead bioaccessibility values derived using the two extraction devices. IVBA values were not statistically different (α = 0.05) between the two extraction devices for any of the soils (n = 6) evaluated in this study, with an average difference in mean lead IVBA of 0.8% (s.d. = 0.5%). The commercially available extraction device was able to generate accurate lead IVBA data as compared to the U.S. EPA's expected value for a National Institute of Standards and Technology standard reference material soil. The relative percent differences between high and low IVBA values for each soil, a measure of instrument precision, were also not statistically different (α = 0.05) between the two extraction devices. The statistical agreement of lead IVBA values observed using the two extraction devices supports the use of a low-cost, commercially available extraction device as a reliable alternative to a custom-fabricated device as required by EPA method 9200.1-86.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Thomas
The design features developed for the Spherical Tokamak (ST) in the PPPL pilot plant study was used as the starting point in developing designs to meet the mission of a Fusion Nuclear Science Facility (FNSF) considering a range of machine sizes based on the influence of tritium consumption and maintenance strategies. The compact nature of a steady state operated ST device for this mission pushes operating conditions and places challenges in the design of components, device maintenance and the integration of supports and services. This paper reviews the general arrangement, design details and maintenance strategy of the ST-FNSF device coremore » for a 1.6-m and 1.0-m device; operating points which bracket the region between purchasing and breeding tritium.« less
Al Mamoon, Ishtiak; Muzahidul Islam, A K M; Baharun, Sabariah; Ahmed, Ashir; Komaki, Shozo
2016-08-01
Due to the rapid growth of wireless medical devices in near future, wireless healthcare services may face some inescapable issue such as medical spectrum scarcity, electromagnetic interference (EMI), bandwidth constraint, security and finally medical data communication model. To mitigate these issues, cognitive radio (CR) or opportunistic radio network enabled wireless technology is suitable for the upcoming wireless healthcare system. The up-to-date research on CR based healthcare has exposed some developments on EMI and spectrum problems. However, the investigation recommendation on system design and network model for CR enabled hospital is rare. Thus, this research designs a hierarchy based hybrid network architecture and network maintenance protocols for previously proposed CR hospital system, known as CogMed. In the previous study, the detail architecture of CogMed and its maintenance protocols were not present. The proposed architecture includes clustering concepts for cognitive base stations and non-medical devices. Two cluster head (CH selector equations are formulated based on priority of location, device, mobility rate of devices and number of accessible channels. In order to maintain the integrity of the proposed network model, node joining and node leaving protocols are also proposed. Finally, the simulation results show that the proposed network maintenance time is very low for emergency medical devices (average maintenance period 9.5 ms) and the re-clustering effects for different mobility enabled non-medical devices are also balanced.
49 CFR 236.26 - Buffing device, maintenance.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions... be maintained so as not to cause the signal to display a less restrictive aspect than intended. Track...
A Prototype Ice-Melting Probe for Collecting Biological Samples from Cryogenic Ice at Low Pressure
NASA Astrophysics Data System (ADS)
Davis, Ashley
2017-08-01
In the Solar System, the surface of an icy moon is composed of irregular ice formations at cryogenic temperatures (<200 K), with an oxidized surface layer and a tenuous atmosphere at very low pressure (<10-6 atm). A lander mission, whose aim is to collect and analyze biological samples from the surface ice, must contain a device that collects samples without refreezing liquid and without sublimation of ice. In addition, if the samples are biological in nature, then precautions must be taken to ensure the samples do not overheat or mix with the oxidized layer. To achieve these conditions, the collector must maintain temperatures close to maintenance or growth conditions of the organism (<293 K), and it must separate or neutralize the oxidized layer and be physically gentle. Here, we describe a device that addresses these requirements and is compatible with low atmospheric pressure while using no pumps. The device contains a heated conical probe with a central orifice, which is forced into surface ice and directs the meltwater upward into a reservoir. The force on the probe is proportional to the height of meltwater (pressure) obtained in the system and allows regulation of the melt rate and temperature of the sample. The device can collect 5-50 mL of meltwater from the surface of an ice block at 233-208 K with an environmental pressure of less than 10-2 atm while maintaining a sample temperature between 273 and 293 K. These conditions maintain most biological samples in a pristine state and maintain the integrity of most organisms' structure and function.
Remote maintenance monitoring system
NASA Technical Reports Server (NTRS)
Simpkins, Lorenz G. (Inventor); Owens, Richard C. (Inventor); Rochette, Donn A. (Inventor)
1992-01-01
A remote maintenance monitoring system retrofits to a given hardware device with a sensor implant which gathers and captures failure data from the hardware device, without interfering with its operation. Failure data is continuously obtained from predetermined critical points within the hardware device, and is analyzed with a diagnostic expert system, which isolates failure origin to a particular component within the hardware device. For example, monitoring of a computer-based device may include monitoring of parity error data therefrom, as well as monitoring power supply fluctuations therein, so that parity error and power supply anomaly data may be used to trace the failure origin to a particular plane or power supply within the computer-based device. A plurality of sensor implants may be rerofit to corresponding plural devices comprising a distributed large-scale system. Transparent interface of the sensors to the devices precludes operative interference with the distributed network. Retrofit capability of the sensors permits monitoring of even older devices having no built-in testing technology. Continuous real time monitoring of a distributed network of such devices, coupled with diagnostic expert system analysis thereof, permits capture and analysis of even intermittent failures, thereby facilitating maintenance of the monitored large-scale system.
Degradation modeling of mid-power white-light LEDs by using Wiener process.
Huang, Jianlin; Golubović, Dušan S; Koh, Sau; Yang, Daoguo; Li, Xiupeng; Fan, Xuejun; Zhang, G Q
2015-07-27
The IES standard TM-21-11 provides a guideline for lifetime prediction of LED devices. As it uses average normalized lumen maintenance data and performs non-linear regression for lifetime modeling, it cannot capture dynamic and random variation of the degradation process of LED devices. In addition, this method cannot capture the failure distribution, although it is much more relevant in reliability analysis. Furthermore, the TM-21-11 only considers lumen maintenance for lifetime prediction. Color shift, as another important performance characteristic of LED devices, may also render significant degradation during service life, even though the lumen maintenance has not reached the critical threshold. In this study, a modified Wiener process has been employed for the modeling of the degradation of LED devices. By using this method, dynamic and random variations, as well as the non-linear degradation behavior of LED devices, can be easily accounted for. With a mild assumption, the parameter estimation accuracy has been improved by including more information into the likelihood function while neglecting the dependency between the random variables. As a consequence, the mean time to failure (MTTF) has been obtained and shows comparable result with IES TM-21-11 predictions, indicating the feasibility of the proposed method. Finally, the cumulative failure distribution was presented corresponding to different combinations of lumen maintenance and color shift. The results demonstrate that a joint failure distribution of LED devices could be modeled by simply considering their lumen maintenance and color shift as two independent variables.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and maintenance requirements for my weight measurement device? 63.9525 Section 63.9525 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for...
2009-09-01
Tele-maintenance Capability with Remote Serial Console Access and Proactive Monitoring of Medical Devices PRINCIPAL INVESTIGATOR...Remote Serial Console Access and Proactive Monitoring of Medical Devices 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...ORGANIZATION REPORT NUMBER Concepteers LLC 880 Bergen Avenue, Suite 403 Jersey City, NJ 07306 9. SPONSORING / MONITORING
Sakashita, Kazumi; Matthews, Wallace J; Yamamoto, Loren G
2013-06-01
Children and youth with special health care needs (CYSHCN) are complex and often dependent on electrical devices (technoelectric dependent) for life support/maintenance. Because they are reliant on electricity and electricity failure is common, the purpose of this study was to survey their preparedness for electricity failure. Parents and caregivers of technoelectric CYSHCN were asked to complete a preparedness questionnaire. We collected a convenience sample of 50 patients. These 50 patients utilized a total of 166 electrical devices. A home ventilator, oxygen concentrator, and a feeding pump were identified as the most important device for the children in 35 of the 50 patients, yet only 19 of the 35 patients could confirm that this device had a battery backup. Also, 22 of the 50 patients had a prolonged power failure preparedness plan. Technoelectric-dependent CYSHCN are poorly prepared for electrical power failure.
A Prototype Ice-Melting Probe for Collecting Biological Samples from Cryogenic Ice at Low Pressure.
Davis, Ashley
2017-08-01
In the Solar System, the surface of an icy moon is composed of irregular ice formations at cryogenic temperatures (<200 K), with an oxidized surface layer and a tenuous atmosphere at very low pressure (<10 -6 atm). A lander mission, whose aim is to collect and analyze biological samples from the surface ice, must contain a device that collects samples without refreezing liquid and without sublimation of ice. In addition, if the samples are biological in nature, then precautions must be taken to ensure the samples do not overheat or mix with the oxidized layer. To achieve these conditions, the collector must maintain temperatures close to maintenance or growth conditions of the organism (<293 K), and it must separate or neutralize the oxidized layer and be physically gentle. Here, we describe a device that addresses these requirements and is compatible with low atmospheric pressure while using no pumps. The device contains a heated conical probe with a central orifice, which is forced into surface ice and directs the meltwater upward into a reservoir. The force on the probe is proportional to the height of meltwater (pressure) obtained in the system and allows regulation of the melt rate and temperature of the sample. The device can collect 5-50 mL of meltwater from the surface of an ice block at 233-208 K with an environmental pressure of less than 10 -2 atm while maintaining a sample temperature between 273 and 293 K. These conditions maintain most biological samples in a pristine state and maintain the integrity of most organisms' structure and function. Key Words: Europa-Icy moon-Microbe-Eukaryote-Spacecraft. Astrobiology 17, 709-720.
30 CFR 57.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...
30 CFR 57.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...
30 CFR 56.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...
30 CFR 57.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...
30 CFR 56.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...
30 CFR 57.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...
30 CFR 56.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...
30 CFR 56.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...
30 CFR 56.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14105 Procedures during repairs or maintenance. Repairs or maintenance of machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment motion or...
30 CFR 57.14105 - Procedures during repairs or maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14105 Procedures during repairs or maintenance. Repairs or maintenance on machinery or equipment shall be performed only after the power is off, and the machinery or equipment blocked against hazardous motion. Machinery or equipment...
30 CFR 77.800-1 - Testing, examination, and maintenance of circuit breakers; procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., examination, and maintenance of circuit breakers; procedures. (a) Circuit breakers and their auxiliary devices protecting high-voltage circuits to portable or mobile equipment shall be tested and examined at least once... circuit breaker and its auxiliary devices, and such repairs or adjustments as are indicated by such tests...
40 CFR 63.9000 - What emission limitations and work practice standards must I meet?
Code of Federal Regulations, 2010 CFR
2010-07-01
... of Hazardous Waste in Boilers and Industrial Furnaces. (d) The emission limits for HCl storage tanks in table 1 to this subpart do not apply during periods of planned routine maintenance of HCl storage tank control devices. Periods of planned routine maintenance of each HCl storage tank control device...
Ding, Bo; Small, Mark; Scheffel, Gina; Holmgren, Ulf
2018-01-01
Background In respiratory disorders, patient- and physician-perceived satisfaction with the maintenance inhaler device is an important factor driving treatment compliance and outcomes. We examine inhaler preferences in asthma and COPD from patient and physician perspectives, particularly focusing on the relative importance of individual device attributes and patient characteristics guiding inhaler choice. Materials and methods Real-world data from >7,300 patients with asthma, COPD, or asthma–COPD overlap syndrome (ACOS) consulting for routine care were derived from respiratory Disease Specific Programs conducted in Europe, USA, Japan, and China. Outcome variables included current pattern of inhaled maintenance therapy and device type, physician preference, patient-reported device attribute importance, and satisfaction. Results The most commonly prescribed inhalers for maintenance therapy of asthma, COPD, and ACOS were dry powder inhalers (62.8%–88.5% of patients) and pressurized metered dose inhalers (18.9%–35.3% of patients). One-third of physicians stated no preference for maintenance device when prescribing treatment, and less than one-third of patients reported being “extremely satisfied” with any attribute of their device. Instructions being “simple and easy to follow” was the inhaler attribute most commonly selected as important. For approximately one-third of patients across all groups, “ease of use/suitability of inhaler device” was a reason for the prescribing decision, as stated by the physician. Device characteristics were more likely to impact the prescribing decision in older patients (in asthma and COPD; P<0.01) and those with worse disease severity (in COPD; P<0.001). Conclusion A relatively high proportion of physicians had no preference for inhaler type across asthma, COPD, and ACOS. Simplicity of use was the most important inhaler attribute from a patient’s perspective. Physicians appeared to place most importance on ease of use and device suitability when selecting inhalers for older patients and those with more severe disease, particularly in COPD. PMID:29588581
Maintenance of Traffic for Innovative Geometric Design Work Zones
DOT National Transportation Integrated Search
2015-12-01
Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The res...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-17
... related detached components; 75.800-4 Testing, examination and maintenance of circuit breakers; record; 75...-4 Testing, examination and maintenance of circuit breakers; record; 75.1001-1 Devices for..., testing, and maintenance; 77.800-2 Testing, examination and maintenance of circuit breakers; record; and...
Outsourcing versus in-house maintenance of medical devices: a longitudinal, empirical study.
Miguel-Cruz, Antonio; Rios-Rincón, Adriana; Haugan, Gregory L
2014-03-01
To determine what factors have a significant influence on the performance of medical device maintenance outsourcing, and to determine how the performance of external governance structures differs depending on whether a hospital is private or public. This was a longitudinal study of 590 maintenance transactions at 20 hospitals in Bogotá, Colombia, involving 764 medical devices and 72 maintenance service providers. Maintenance performance data (i.e., turn-around time in hours; TAT) for the service providers (either in-house or outsourced) were primarily collected over a 20-month period, from December 2009-August 2011, by means of a monitoring procedure; then, a hazards model was run. The availability of specific repair parts, in-stock, in the city in which the medical devices were located, had a positive impact on the performance of both internal and external governance structures. Online service also had a positive impact on both, with a stronger positive impact on the performance of internal governance than on that of external governance. For transactions governed by external structures, better performance was seen in private hospitals than in public ones. In public health institutions, internal governance showed better performance than external governance. Both internal and external governance structures showed better performance in private healthcare institutions than in public ones. In public health institutions, internal governance shows better performance than external governance; this suggests that healthcare managers should reconsider the trend to eliminate in-house maintenance service staff in public healthcare institutions.
NASA Technical Reports Server (NTRS)
Rector, Tony; Steele, John W.; Bue, Grant C.; Campbell, Colin; Makinen, Janice
2012-01-01
A water loop maintenance device and process to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been undergoing a performance evaluation. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the water recirculation maintenance device and process is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The maintenance process further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware. This
Boelter, Fred; Simmons, Catherine; Hewett, Paul
2011-04-01
Fluid sealing devices (gaskets and packing) containing asbestos are manufactured and blended with binders such that the asbestos fibers are locked in a matrix that limits the potential for fiber release. Occasionally, fluid sealing devices fail and need to be replaced or are removed during preventive maintenance activities. This is the first study known to pool over a decade's worth of exposure assessments involving fluid sealing devices used in a variety of applications. Twenty-one assessments of work activities and air monitoring were performed under conditions with no mechanical ventilation and work scenarios described as "worst-case" conditions. Frequently, the work was conducted using aggressive techniques, along with dry removal practices. Personal and area samples were collected and analyzed in accordance with the National Institute for Occupational Safety and Health Methods 7400 and 7402. A total of 782 samples were analyzed by phase contrast microscopy, and 499 samples were analyzed by transmission electron microscopy. The statistical data analysis focused on the overall data sets which were personal full-shift time-weighted average (TWA) exposures, personal 30-min exposures, and area full-shift TWA values. Each data set contains three estimates of exposure: (1) total fibers; (2) asbestos fibers only but substituting a value of 0.0035 f/cc for censored data; and (3) asbestos fibers only but substituting the limit of quantification value for censored data. Censored data in the various data sets ranged from 7% to just over 95%. Because all the data sets were censored, the geometric mean and geometric standard deviation were estimated using the maximum likelihood estimation method. Nonparametric, Kaplan-Meier, and lognormal statistics were applied and found to be consistent and reinforcing. All three sets of statistics suggest that the mean and median exposures were less than 25% of 0.1 f/cc 8-hr TWA sample or 1.0 f/cc 30-min samples, and that there is at least 95% confidence that the true 95th percentile exposures are less than 0.1 f/cc as an 8-hr TWA.
Code of Federal Regulations, 2010 CFR
2010-07-01
... DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a) Maintenance during the durability evaluation can best be considered in three separate categories: (1) Normal... durability evaluation in this program will probably have considerable mileage accumulation and unknown...
Data Mining CMMSs: How to Convert Data into Knowledge.
Fennigkoh, Larry; Nanney, D Courtney
2018-01-01
Although the healthcare technology management (HTM) community has decades of accumulated medical device-related maintenance data, little knowledge has been gleaned from these data. Finding and extracting such knowledge requires the use of the well-established, but admittedly somewhat foreign to HTM, application of inferential statistics. This article sought to provide a basic background on inferential statistics and describe a case study of their application, limitations, and proper interpretation. The research question associated with this case study involved examining the effects of ventilator preventive maintenance (PM) labor hours, age, and manufacturer on needed unscheduled corrective maintenance (CM) labor hours. The study sample included more than 21,000 combined PM inspections and CM work orders on 2,045 ventilators from 26 manufacturers during a five-year period (2012-16). A multiple regression analysis revealed that device age, manufacturer, and accumulated PM inspection labor hours all influenced the amount of CM labor significantly (P < 0.001). In essence, CM labor hours increased with increasing PM labor. However, and despite the statistical significance of these predictors, the regression analysis also indicated that ventilator age, manufacturer, and PM labor hours only explained approximately 16% of all variability in CM labor, with the remainder (84%) caused by other factors that were not included in the study. As such, the regression model obtained here is not suitable for predicting ventilator CM labor hours.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Maintenance. 610.52 Section 610.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) ENERGY POLICY FUEL ECONOMY RETROFIT DEVICES Test Procedures and Evaluation Criteria Durability Test Procedures § 610.52 Maintenance. (a...
Maza, Mauricio; Figueroa, Ruben; Laskow, Bari; Juárez, Alexa; Alfaro, Karla; Alonzo, Todd A; Felix, Juan C; Gage, Julia C; Cremer, Miriam
2018-01-01
The aim of the study was to evaluate the impact of maintenance on performance of cryosurgical equipment used in El Salvador primary health clinics. Nine gynecological cryotherapy devices used in El Salvador were bench tested against a new machine of the same make and model. The devices were run for five successive double-freeze cycles. The El Salvador machines then received maintenance by a specialized engineer and another double-freeze cycle was performed. Temperature at the device probe tip was recorded throughout each cycle and ballistic gelatin was used as the tissue analogue to measure freeze ball dimensions achieved by the devices. Outcome measures were mean lowest-sustained temperatures and freeze ball mean weight, depth, and diameter. Paired and unpaired t tests were used to compare results premaintenance versus postmaintenance and postmaintenance versus the reference, respectively. Premaintenance versus postmaintenance freeze ball dimensions were significantly different (mean differences in weight = 2.31 g, p = .01; depth = 2.29 mm, p = .03; diameter = 3.51 mm, p = .02). However, postmaintenance dimensions were not significantly different than those of the reference (weight = 7.44 g vs. 8.39 g, p = .07; depth = 10.71 vs. 11.24 mm, p = .1; diameter = 31.38 mm vs. 32.05 mm, p = .3). Postmaintenance, minimum, and lowest-sustained temperatures were within the recommended clinical range. Specialized maintenance was necessary for heavily used cryotherapy devices to perform adequately, highlighting the challenges of gas-based cryotherapy in low- and middle-income countries.
Quintella, Cristina M; Meira, Marilena; Silva, Weidson Leal; Filho, Rogério G D; Araújo, André L C; Júnior, Elias T S; Sales, Lindolfo J O
2013-12-15
Power transformers are essential for a functioning electrical system and therefore require special attention by maintenance programs because a fault can harm both the company and society. The temperature inside a power transformer and the dissolved gases, which are primarily composed of acetylene, are the two main parameters monitored when detecting faults. This paper describes the development of a device for analyzing the acetylene content in insulating oil using spectrofluorimetry. Using this device introduces a new methodology for the maintaining and operating power transformers. The prototype is currently operating in a substation. The results presented by this system were satisfactory; when compared to chromatographic data, the errors did not exceed 15%. This prototype may be used to confirm the quality of an insulating oil sample to detect faults in power transformers. © 2013 Elsevier B.V. All rights reserved.
Fougère, S; Beydon, L; Saulnier, F
2008-10-01
Medical devices are known to carry risks from design to scrap. Accident reports in ICU show that medical device account for only 20% of accidents. Formation of users and providing a postmarketing incident reporting are thus essential in health institutions. Clinical and engineering departments should cooperate to produce and secure procedures which should be applied during the lifetime of each clinical device. Several points should be especially fulfilled: close cooperation between clinical departments and biomedical engineering departments with available technicians, computer-based inventory of all devices, evaluation of specifications required before purchasing a new device, education of users on utilisation and maintenance, technical follow-up of devices and keeping maintenance and repair logs, ability to provide users with replacement devices, provision of check-lists before use, forging criteria to decide when device should be discarded. These principles are simple and should be considered as mandatory in order to improve medical device related security.
21 CFR 868.5400 - Electroanesthesia apparatus.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Electroanesthesia apparatus. 868.5400 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Therapeutic Devices § 868.5400 Electroanesthesia apparatus. (a) Identification. An electroanesthesia apparatus is a device used for the induction and maintenance of anesthesia...
21 CFR 868.5400 - Electroanesthesia apparatus.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Electroanesthesia apparatus. 868.5400 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Therapeutic Devices § 868.5400 Electroanesthesia apparatus. (a) Identification. An electroanesthesia apparatus is a device used for the induction and maintenance of anesthesia...
Radiology equipment maintenance and contract procurement in the UK.
Wright, Christopher J
2012-01-01
Radiology equipment maintenance has a similar financial value to new device acquisition over the lifetime of the device. Comprehensive style contracts are dominant largely due to their ease of use and the potential to control budgetary costs, but costs are high. Creative procurement solutions can offer better value. The corrective portion of comprehensive contracts is estimated to be between 50% (Mobile C-Arm) to 92% (CT), which equates to $29.4 million; 80% of the total contract costs within the research population of this study. Many organizations could free up cash by better managing their maintenance costs, potentially creating funding opportunities for new equipment.
Diaconu, Karin; Chen, Yen-Fu; Cummins, Carole; Jimenez Moyao, Gabriela; Manaseki-Holland, Semira; Lilford, Richard
2017-08-18
Forty to 70 % of medical devices and equipment in low- and middle-income countries are broken, unused or unfit for purpose; this impairs service delivery to patients and results in lost resources. Undiscerning procurement processes are at the heart of this issue. We conducted a systematic review of the literature to August 2013 with no time or language restrictions to identify what product selection or prioritization methods are recommended or used for medical device and equipment procurement planning within low- and middle-income countries. We explore the factors/evidence-base proposed for consideration within such methods and identify prioritization criteria. We included 217 documents (corresponding to 250 texts) in the narrative synthesis. Of these 111 featured in the meta-summary. We identify experience and needs-based methods used to reach procurement decisions. Equipment costs (including maintenance) and health needs are the dominant issues considered. Extracted data suggest that procurement officials should prioritize devices with low- and middle-income country appropriate technical specifications - i.e. devices and equipment that can be used given available human resources, infrastructure and maintenance capacity. Suboptimal device use is directly linked to incomplete costing and inadequate consideration of maintenance services and user training during procurement planning. Accurate estimation of life-cycle costing and careful consideration of device servicing are of crucial importance.
40 CFR 63.1160 - Compliance dates and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... plugged spray nozzles or other liquid delivery devices; (B) Repair or replacement of missing, misaligned... be initiated are the applicable actions that are specified in the maintenance plan. Failure to...
40 CFR 63.1160 - Compliance dates and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... nozzles or other liquid delivery devices; (B) Repair or replacement of missing, misaligned, or damaged... applicable actions that are specified in the maintenance plan. Failure to initiate or provide appropriate...
40 CFR 63.1160 - Compliance dates and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... nozzles or other liquid delivery devices; (B) Repair or replacement of missing, misaligned, or damaged... applicable actions that are specified in the maintenance plan. Failure to initiate or provide appropriate...
40 CFR 63.1160 - Compliance dates and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plugged spray nozzles or other liquid delivery devices; (B) Repair or replacement of missing, misaligned... be initiated are the applicable actions that are specified in the maintenance plan. Failure to...
40 CFR 63.1160 - Compliance dates and maintenance requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... plugged spray nozzles or other liquid delivery devices; (B) Repair or replacement of missing, misaligned... be initiated are the applicable actions that are specified in the maintenance plan. Failure to...
30 CFR 74.10 - Operating and maintenance instructions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... storage instructions and a maintenance and service life plan with each new CPDM device sold. These... of how the CPDM works; (ii) A schematic diagram of the CPDM; (iii) Procedures for wearing and use of... functioning of the CPDM. (2) The maintenance and service life plan must address: (i) Conditions that should...
49 CFR 236.739 - Device, acknowledging.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.739... locomotive equipped with an automatic train stop or train control device, an automatic brake application can be forestalled, or by means of which, on a locomotive equipped with an automatic cab signal device...
30 CFR 75.800-3 - Testing, examination and maintenance of circuit breakers; procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... High-Voltage Distribution § 75.800-3 Testing, examination and maintenance of circuit breakers; procedures. (a) Circuit breakers and their auxiliary devices protecting underground high-voltage circuits...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, C.; Richardson, J. E.; Fallows, P.
2006-07-01
Power Fluidics is the generic name for a range of maintenance-free fluid transfer and mixing devices, capable of handling a wide range of highly radioactive fluids, jointly developed by British Nuclear Group, its US-based subsidiary BNG America, and AEA Technology. Power Fluidic devices include Reverse Flow Diverters (RFDs), Vacuum Operated Slug Lifts (VOSLs), and Air Lifts, all of which have an excellent proven record for pumping radioactive liquids and sludges. Variants of the RFD, termed Pulse Jet Mixers (PJMs) are used to agitate and mix tank contents, where maintenance-free equipment is desirable, and where a high degree of homogenization ismore » necessary. The equipment is designed around the common principle of using compressed air to provide the motive force to transfer liquids and sludges. These devices have no moving parts in contact with the radioactive medium and therefore require no maintenance in radioactive areas of processing plants. Once commissioned, Power Fluidic equipment has been demonstrated to operate for the life of the facility. Over 800 fluidic devices continue to operate safely and reliably in British Nuclear Group's nuclear facilities at the Sellafield site in the United Kingdom, and some of these have done so for almost 40 years. More than 400 devices are being supplied by AEA Technology and BNG America for the Waste Treatment Plant (WTP) at the Hanford Site in southeastern Washington State, USA. This paper discusses: - Principles of operation of fluidic pumps and mixers. - Selection criteria and design of fluidic pumps and mixers. - Operational experience of fluidic pumps and mixers in the United Kingdom. - Applications of fluidic pumps and mixers at the U.S. Department of Energy nuclear sites. (authors)« less
High-precision relative position and attitude measurement for on-orbit maintenance of spacecraft
NASA Astrophysics Data System (ADS)
Zhu, Bing; Chen, Feng; Li, Dongdong; Wang, Ying
2018-02-01
In order to realize long-term on-orbit running of satellites, space stations, etc spacecrafts, in addition to the long life design of devices, The life of the spacecraft can also be extended by the on-orbit servicing and maintenance. Therefore, it is necessary to keep precise and detailed maintenance of key components. In this paper, a high-precision relative position and attitude measurement method used in the maintenance of key components is given. This method mainly considers the design of the passive cooperative marker, light-emitting device and high resolution camera in the presence of spatial stray light and noise. By using a series of algorithms, such as background elimination, feature extraction, position and attitude calculation, and so on, the high precision relative pose parameters as the input to the control system between key operation parts and maintenance equipment are obtained. The simulation results show that the algorithm is accurate and effective, satisfying the requirements of the precision operation technique.
40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...
40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...
40 CFR 63.8485 - What reports must I submit and when?
Code of Federal Regulations, 2010 CFR
2010-07-01
...). (5) A description of control device maintenance performed while the control device was offline and the kiln controlled by the control device was operating, including the information specified in paragraphs (c)(5)(i) through (iii) of this section. (i) The date and time when the control device was...
Theoferometer for High Accuracy Optical Alignment and Metrology
NASA Technical Reports Server (NTRS)
Toland, Ronald; Leviton, Doug; Koterba, Seth
2004-01-01
The accurate measurement of the orientation of optical parts and systems is a pressing problem for upcoming space missions, such as stellar interferometers, requiring the knowledge and maintenance of positions to the sub-arcsecond level. Theodolites, the devices commonly used to make these measurements, cannot provide the needed level of accuracy. This paper describes the design, construction, and testing of an interferometer system to fill the widening gap between future requirements and current capabilities. A Twyman-Green interferometer mounted on a 2 degree of freedom rotation stage is able to obtain sub-arcsecond, gravity-referenced tilt measurements of a sample alignment cube. Dubbed a 'theoferometer,' this device offers greater ease-of-use, accuracy, and repeatability than conventional methods, making it a suitable 21st-century replacement for the theodolite.
14 CFR 121.139 - Requirements for manual aboard aircraft: Supplemental operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., it must carry a compatible reading device that produces a legible image of the maintenance information and instructions or a system that is able to retrieve the maintenance information and instructions...
14 CFR 121.139 - Requirements for manual aboard aircraft: Supplemental operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., it must carry a compatible reading device that produces a legible image of the maintenance information and instructions or a system that is able to retrieve the maintenance information and instructions...
Ground Software Maintenance Facility (GSMF) system manual
NASA Technical Reports Server (NTRS)
Derrig, D.; Griffith, G.
1986-01-01
The Ground Software Maintenance Facility (GSMF) is designed to support development and maintenance of spacelab ground support software. THE GSMF consists of a Perkin Elmer 3250 (Host computer) and a MITRA 125s (ATE computer), with appropriate interface devices and software to simulate the Electrical Ground Support Equipment (EGSE). This document is presented in three sections: (1) GSMF Overview; (2) Software Structure; and (3) Fault Isolation Capability. The overview contains information on hardware and software organization along with their corresponding block diagrams. The Software Structure section describes the modes of software structure including source files, link information, and database files. The Fault Isolation section describes the capabilities of the Ground Computer Interface Device, Perkin Elmer host, and MITRA ATE.
FE Fossum performs aRED In-Flight Maintenance
2011-07-28
ISS028-E-019392 (28 July 2011) --- NASA astronaut Mike Fossum, Expedition 28 flight engineer, performs in-flight maintenance on the advanced Resistive Exercise Device (aRED) in the Tranquility node of the International Space Station.
FE Fossum performs aRED In-Flight Maintenance
2011-07-28
ISS028-E-019399 (28 July 2011) --- NASA astronaut Mike Fossum, Expedition 28 flight engineer, performs in-flight maintenance on the advanced Resistive Exercise Device (aRED) in the Tranquility node of the International Space Station.
Positive guidance and older motorists : guidelines for maintenance supervisors
DOT National Transportation Integrated Search
1996-12-01
This is a field manual designed for maintenance supervisors and resident : engineers responsible for repair and replacement of traffic control devices on : highways and streets. Standards and practices have not always taken in account : the realities...
Evaluation of Hands-Free Devices for Space Habitat Maintenance Procedures
NASA Technical Reports Server (NTRS)
Hoffman, R. B.; Twyford, E.; Conlee, C. S.; Litaker, H. L.; Solemn, J. A.; Holden
2007-01-01
Currently, International Space Station (ISS) crews use a laptop computer to display procedures for performing onboard maintenance tasks. This approach has been determined to be suboptimal. A heuristic evaluation and two studies have been completed to test commercial off-the-shelf (COTS) "near-eye" heads up displays (HUDs) for support of these types of maintenance tasks. In both studies, subjects worked through electronic procedures to perform simple maintenance tasks. As a result of the Phase I study, three HUDs were down-selected to one. In the Phase II study, the HUD was compared against two other electronic display devices - a laptop computer and an e-book reader. Results suggested that adjustability and stability of the HUD display were the most significant acceptability factors to consider for near-eye displays. The Phase II study uncovered a number of advantages and disadvantages of the HUD relative to the laptop and e-book reader for interacting with electronic procedures.
Application and Design Characteristics of Generalized Training Devices.
ERIC Educational Resources Information Center
Parker, Edward L.
This program identified applications and developed design characteristics for generalized training devices. The first of three sequential phases reviewed in detail new developments in Naval equipment technology that influence the design of maintenance training devices: solid-state circuitry, modularization, digital technology, standardization,…
40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... emissions are controlled with a common control device or series of control devices, are discharged to the... devices or multiple series of control devices are discharged to the atmosphere through more than one stack... control activities (including, as applicable, calibration checks and required zero and span adjustments...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... description of control device maintenance performed while the control device was offline and the kiln controlled by the control device was operating, including the information specified in paragraphs (c)(5)(i) through (iii) of this section. (i) The date and time when the control device was shutdown and restarted...
40 CFR 63.2281 - What reports must I submit and when?
Code of Federal Regulations, 2010 CFR
2010-07-01
... description of control device maintenance performed while the control device was offline and one or more of the process units controlled by the control device was operating, including the information specified in paragraphs (c)(5)(i) through (iii) of this section. (i) The date and time when the control device...
Thermal oxidation of Si/SiGe heterostructures for use in quantum dot qubits
NASA Astrophysics Data System (ADS)
Neyens, Samuel F.; Foote, Ryan H.; Knapp, T. J.; McJunkin, Thomas; Savage, D. E.; Lagally, M. G.; Coppersmith, S. N.; Eriksson, M. A.
Here we demonstrate dry thermal oxidation of a Si/SiGe heterostructure at 700°C and use a Hall bar device to measure the mobility after oxidation to be 43,000 cm2V-1s-1 at a carrier density of 4.1 ×1011 cm-2. Surprisingly, we find no significant reduction in mobility compared with an Al2O3 device made with atomic layer deposition on the same heterostructure, indicating thermal oxidation can be used to process Si/SiGe quantum dot devices. This result provides a path for investigating improvements to the gate oxide in Si/SiGe qubit devices, whose performance is believed to be limited by charge noise in the oxide layer. This work was supported in part by ARO (W911NF-12-0607) and NSF (DMR-1206915 and PHY-1104660). Development and maintenance of the growth facilities used for fabricating samples is supported by DOE (DE-FG02-03ER46028). This research utilized NSF-supported shared facilities at the University of Wisconsin-Madison.
Predictive modeling for corrective maintenance of imaging devices from machine logs.
Patil, Ravindra B; Patil, Meru A; Ravi, Vidya; Naik, Sarif
2017-07-01
In the cost sensitive healthcare industry, an unplanned downtime of diagnostic and therapy imaging devices can be a burden on the financials of both the hospitals as well as the original equipment manufacturers (OEMs). In the current era of connectivity, it is easier to get these devices connected to a standard monitoring station. Once the system is connected, OEMs can monitor the health of these devices remotely and take corrective actions by providing preventive maintenance thereby avoiding major unplanned downtime. In this article, we present an overall methodology of predicting failure of these devices well before customer experiences it. We use data-driven approach based on machine learning to predict failures in turn resulting in reduced machine downtime, improved customer satisfaction and cost savings for the OEMs. One of the use-case of predicting component failure of PHILIPS iXR system is explained in this article.
30 CFR 75.1714-3 - Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
Code of Federal Regulations, 2010 CFR
2010-07-01
... devices by a person trained to perform such functions. (b) After each time a self-rescue device is worn or... person trained to perform this function. Self-rescue devices with broken seals or which are damaged so... accurate to within +1 gram. A device that weighs more than 10 grams over its original weight shall be...
Personal exposure assessment to particulate metals using a paper-based analytical device
NASA Astrophysics Data System (ADS)
Cate, David; Volckens, John; Henry, Charles
2013-03-01
The development of a paper-based analytical device (PAD) for assessing personal exposure to particulate metals will be presented. Human exposure to metal aerosols, such as those that occur in the mining, construction, and manufacturing industries, has a significant impact on the health of our workforce, costing an estimated $10B in the U.S and causing approximately 425,000 premature deaths world-wide each year. Occupational exposure to particulate metals affects millions of individuals in manufacturing, construction (welding, cutting, blasting), and transportation (combustion, utility maintenance, and repair services) industries. Despite these effects, individual workers are rarely assessed for their exposure to particulate metals, due mainly to the high cost and effort associated with personal exposure measurement. Current exposure assessment methods for particulate metals call for an 8-hour filter sample, after which time, the filter sample is transported to a laboratory and analyzed by inductively-coupled plasma (ICP). The time from sample collection to reporting is typically weeks and costs several hundred dollars per sample. To exacerbate the issue, method detection limits suffer because of sample dilution during digestion. The lack of sensitivity hampers task-based exposure assessment, for which sampling times may be tens of minutes. To address these problems, and as a first step towards using microfluidics for personal exposure assessment, we have developed PADs for measurement of Pb, Cd, Cr, Fe, Ni, and Cu in aerosolized particulate matter.
Moroni, Maria; Coolbaugh, Thea V; Mitchell, Jennifer M; Lombardini, Eric; Moccia, Krinon D; Shelton, Larry J; Nagy, Vitaly; Whitnall, Mark H
2011-01-01
Threats of nuclear and other radiologic exposures have been increasing, but no countermeasure for acute radiation syndrome has been approved by regulatory authorities. Because of their similarity to humans in regard to physiology and anatomy, we are characterizing Gottingen minipigs as a model to aid the development of radiation countermeasures. Irradiated minipigs exhibit immunosuppression, severe thrombocytopenia, vascular leakage, and acute inflammation. These complications render serial acquisition of blood samples problematic. Vascular access ports (VAP) facilitate serial sampling, but their use often is complicated by infections and fibrin deposition. We demonstrate here the successful use of VAP for multiple blood samplings in irradiated minipigs. Device design and limited postoperative prophylactic antimicrobial therapy before irradiation were key to obtaining serial sampling, reducing swelling, and eliminating infection and skin necrosis at the implantation site. Modifications of previous protocols included the use of polydioxanone sutures instead of silk; eliminating chronic port access; single-use, sterile, antireflux prefilled syringes for flushing; strict aseptic weekly maintenance of the device, and acclimating animals to reduce stress. VAP remained functional in 19 of 20 irradiated animals for as long as 3 mo. The remaining VAP failed due to a small leak in the catheter, leading to clot formation. VAP-related sepsis occurred in 2 minipigs. Blood sampling did not cause detectable stress in nonanesthetized sham-irradiated animals, according to leukograms and clinical signs. PMID:21333166
33 CFR 150.503 - What are the time interval requirements for maintenance on survival craft falls?
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for maintenance on survival craft falls? 150.503 Section 150.503 Navigation and Navigable Waters... maintenance on survival craft falls? (a) Each fall used in a launching device for survival craft or rescue boats must be turned end-for-end at intervals of not more than 30 months. (b) Each fall must be replaced...
33 CFR 150.503 - What are the time interval requirements for maintenance on survival craft falls?
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements for maintenance on survival craft falls? 150.503 Section 150.503 Navigation and Navigable Waters... maintenance on survival craft falls? (a) Each fall used in a launching device for survival craft or rescue boats must be turned end-for-end at intervals of not more than 30 months. (b) Each fall must be replaced...
33 CFR 150.503 - What are the time interval requirements for maintenance on survival craft falls?
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements for maintenance on survival craft falls? 150.503 Section 150.503 Navigation and Navigable Waters... maintenance on survival craft falls? (a) Each fall used in a launching device for survival craft or rescue boats must be turned end-for-end at intervals of not more than 30 months. (b) Each fall must be replaced...
33 CFR 150.503 - What are the time interval requirements for maintenance on survival craft falls?
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements for maintenance on survival craft falls? 150.503 Section 150.503 Navigation and Navigable Waters... maintenance on survival craft falls? (a) Each fall used in a launching device for survival craft or rescue boats must be turned end-for-end at intervals of not more than 30 months. (b) Each fall must be replaced...
33 CFR 150.503 - What are the time interval requirements for maintenance on survival craft falls?
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements for maintenance on survival craft falls? 150.503 Section 150.503 Navigation and Navigable Waters... maintenance on survival craft falls? (a) Each fall used in a launching device for survival craft or rescue boats must be turned end-for-end at intervals of not more than 30 months. (b) Each fall must be replaced...
Code of Federal Regulations, 2010 CFR
2010-04-01
... zone fatalities and injuries to workers and road users by establishing minimum requirements and..., installation and maintenance of temporary traffic control devices, and use of uniformed law enforcement officers during construction, utility, and maintenance operations, and by requiring contract pay items to...
Electronic and software systems of an automated portable static mass spectrometer
NASA Astrophysics Data System (ADS)
Chichagov, Yu. V.; Bogdanov, A. A.; Lebedev, D. S.; Kogan, V. T.; Tubol'tsev, Yu. V.; Kozlenok, A. V.; Moroshkin, V. S.; Berezina, A. V.
2017-01-01
The electronic systems of a small high-sensitivity static mass spectrometer and software and hardware tools, which allow one to determine trace concentrations of gases and volatile compounds in air and water samples in real time, have been characterized. These systems and tools have been used to set up the device, control the process of measurement, synchronize this process with accompanying measurements, maintain reliable operation of the device, process the obtained results automatically, and visualize and store them. The developed software and hardware tools allow one to conduct continuous measurements for up to 100 h and provide an opportunity for personnel with no special training to perform maintenance on the device. The test results showed that mobile mass spectrometers for geophysical and medical research, which were fitted with these systems, had a determination limit for target compounds as low as several ppb(m) and a mass resolving power (depending on the current task) as high as 250.
78 FR 22367 - Proposed Information Collection (Service Data Manual) Activity: Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-15
... technical medical equipment and devices or mechanical equipment. DATES: Written comments and recommendations... manuals and maintenance/repair manuals when technical medical equipment and devices, or mechanical...
NASA Technical Reports Server (NTRS)
Steele, John W.; Rector, Tony; Bue, Grant C.; Campbell, Colin; Makinen, Janice
2013-01-01
A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The bed design further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.
NASA Technical Reports Server (NTRS)
Steele, John W.; Rector, Tony; Bue, Grant C.; Campbell, Colin; Makinen, Janice
2012-01-01
A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high-capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit Transport Water Loop. The bed design further leverages a sorbent developed for the ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System. The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of crewed spaceflight Environmental Control and Life Support System hardware.
NASA Technical Reports Server (NTRS)
Steele, John W.; Rector, Tony; Bue, Grant C.; Campbell, Colin; Makinen, Janice
2011-01-01
A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The bed design further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a clear demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.
Code of Federal Regulations, 2010 CFR
2010-04-01
... mobility of road users and highway workers. These safety and mobility impacts are exacerbated by an aging... prescribes standards for the design, application, installation, and maintenance of traffic control devices for highway and street construction, maintenance operation, and utility work. In addition to the...
40 CFR 169.2 - Maintenance of records.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 169.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS BOOKS AND RECORDS OF PESTICIDE PRODUCTION AND DISTRIBUTION § 169.2 Maintenance of records. All producers of pesticides, devices, or active ingredients used in producing pesticides subject to this Act, including...
40 CFR 169.2 - Maintenance of records.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 169.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS BOOKS AND RECORDS OF PESTICIDE PRODUCTION AND DISTRIBUTION § 169.2 Maintenance of records. All producers of pesticides, devices, or active ingredients used in producing pesticides subject to this Act, including...
40 CFR 169.2 - Maintenance of records.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 169.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS BOOKS AND RECORDS OF PESTICIDE PRODUCTION AND DISTRIBUTION § 169.2 Maintenance of records. All producers of pesticides, devices, or active ingredients used in producing pesticides subject to this Act, including...
40 CFR 169.2 - Maintenance of records.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 169.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS BOOKS AND RECORDS OF PESTICIDE PRODUCTION AND DISTRIBUTION § 169.2 Maintenance of records. All producers of pesticides, devices, or active ingredients used in producing pesticides subject to this Act, including...
40 CFR 169.2 - Maintenance of records.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 169.2 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS BOOKS AND RECORDS OF PESTICIDE PRODUCTION AND DISTRIBUTION § 169.2 Maintenance of records. All producers of pesticides, devices, or active ingredients used in producing pesticides subject to this Act, including...
Multicenter clinical trial of a home-use nonablative fractional laser device for wrinkle reduction.
Leyden, James; Stephens, Thomas J; Herndon, James H
2012-11-01
Until now, nonablative fractional treatments could only be delivered in an office setting by trained professionals. The goal of this work was to perform clinical testing of a nonablative fractional laser device designed for home-use. This multicenter trial consisted of two clinical studies with slightly varying treatment protocols in which subjects performed at-home treatments of periorbital wrinkles using a handheld nonablative fractional laser. Both studies included an active treatment phase (daily treatments) and a maintenance phase (twice-weekly treatments). In all, 36 subjects were followed up for as long as 5 months after completion of the maintenance phase and 90 subjects were followed up until the completion of the maintenance phase. Evaluations included in-person investigator assessment, independent blinded review of high-resolution images using the Fitzpatrick Wrinkle Scale, and subject self-assessment. All 124 subjects who completed the study were able to use the device following written instructions for use. Treatments were well tolerated with good protocol compliance. Independent blinded evaluations by a panel of physicians showed Fitzpatrick Wrinkle Scale score improvement by one or more grades in 90% of subjects at the completion of the active phase and in 79% of subjects at the completion of the maintenance phase. The most prevalent side effect was transient posttreatment erythema. Lack of a control group and single-blinded study groups were limitations. Safety testing with self-applications by users demonstrated the utility of the device for home use. Independent blinded review of clinical images confirmed the device's proficiency for improving periorbital wrinkles. Copyright © 2012 American Academy of Dermatology, Inc. Published by Mosby, Inc. All rights reserved.
The use of fault reporting of medical equipment to identify latent design flaws.
Flewwelling, C J; Easty, A C; Vicente, K J; Cafazzo, J A
2014-10-01
Poor device design that fails to adequately account for user needs, cognition, and behavior is often responsible for use errors resulting in adverse events. This poor device design is also often latent, and could be responsible for "No Fault Found" (NFF) reporting, in which medical devices sent for repair by clinical users are found to be operating as intended. Unresolved NFF reports may contribute to incident under reporting, clinical user frustration, and biomedical engineering technologist inefficacy. This study uses human factors engineering methods to investigate the relationship between NFF reporting frequency and device usability. An analysis of medical equipment maintenance data was conducted to identify devices with a high NFF reporting frequency. Subsequently, semi-structured interviews and heuristic evaluations were performed in order to identify potential usability issues. Finally, usability testing was conducted in order to validate that latent usability related design faults result in a higher frequency of NFF reporting. The analysis of medical equipment maintenance data identified six devices with a high NFF reporting frequency. Semi-structured interviews, heuristic evaluations and usability testing revealed that usability issues caused a significant portion of the NFF reports. Other factors suspected to contribute to increased NFF reporting include accessory issues, intermittent faults and environmental issues. Usability testing conducted on three of the devices revealed 23 latent usability related design faults. These findings demonstrate that latent usability related design faults manifest themselves as an increase in NFF reporting and that devices containing usability related design faults can be identified through an analysis of medical equipment maintenance data. Copyright © 2014 The Authors. Published by Elsevier Inc. All rights reserved.
30 CFR 57.14132 - Horns and backup alarms for surface equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... NONMETAL MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 57.14132 Horns and backup alarms for surface equipment. (a) Manually-operated horns or other audible warning devices provided on self-propelled mobile equipment as a safety device shall be maintained in a functional...
DOT National Transportation Integrated Search
2000-10-01
This report documents the second year of a two-year project to evaluate the effectiveness of innovative work zone traffic control devices. Researchers evaluated these devices at short-term rural work zones. During the second year of the project, seve...
78 FR 45052 - Critical Parts for Airplane Propellers; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
..., early warning devices, maintenance checks, and other similar equipment or procedures. If items of the..., and maintenance processes for propeller critical parts. An unintentional error was introduced in Sec... transportation, Aircraft, Aviation safety, Safety. The Correcting Amendment In consideration of the foregoing...
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator shall maintain records for all maintenance performed on the air pollution control equipment. The... construction of its vapor collection system and air pollution control device. (2)(i) Vapor collection system of... all maintenance performed on the air pollution control equipment. The Administrator will consider the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... operator shall maintain records for all maintenance performed on the air pollution control equipment. The... construction of its vapor collection system and air pollution control device. (2)(i) Vapor collection system of... all maintenance performed on the air pollution control equipment. The Administrator will consider the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... operator shall maintain records for all maintenance performed on the air pollution control equipment. The... construction of its vapor collection system and air pollution control device. (2)(i) Vapor collection system of... all maintenance performed on the air pollution control equipment. The Administrator will consider the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... operator shall maintain records for all maintenance performed on the air pollution control equipment. The... construction of its vapor collection system and air pollution control device. (2)(i) Vapor collection system of... all maintenance performed on the air pollution control equipment. The Administrator will consider the...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
Excimer laser therapy and narrowband ultraviolet B therapy for exfoliative cheilitis.
Bhatia, Bhavnit K; Bahr, Brooks A; Murase, Jenny E
2015-06-01
Exfoliative cheilitis is a condition of unknown etiology characterized by hyperkeratosis and scaling of vermilion epithelium with cyclic desquamation. It remains largely refractory to treatment, including corticosteroid therapy, antibiotics, antifungals, and immunosuppressants. We sought to evaluate the safety and efficacy of excimer laser therapy and narrowband ultraviolet B therapy in female patients with refractory exfoliative cheilitis. We reviewed the medical records of two female patients who had been treated unsuccessfully for exfoliative cheilitis. We implemented excimer laser therapy, followed by hand-held narrowband UVB treatments for maintenance therapy, and followed them for clinical improvement and adverse effects. Both patients experienced significant clinical improvement with minimal adverse effects with excimer laser therapy 600-700 mJ/cm 2 twice weekly for several months. The most common adverse effects were bleeding and burning, which occurred at higher doses. The hand-held narrowband UVB unit was also an effective maintenance tool. Limitations include small sample size and lack of standardization of starting dose and dose increments. Excimer laser therapy is a well-tolerated and effective treatment for refractory exfoliative cheilitis with twice weekly laser treatments of up to 700 mJ/cm 2 . Transitioning to the hand-held narrowband UVB device was also an effective maintenance strategy.
30 CFR 56.9307 - Design, installation, and maintenance of railroads.
Code of Federal Regulations, 2010 CFR
2010-07-01
... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads. Roadbeds...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
Code of Federal Regulations, 2010 CFR
2010-10-01
... activated by the application of the machine braking system, and designed to be visible for a distance of 300... TRANSPORTATION RAILROAD WORKPLACE SAFETY On-Track Roadway Maintenance Machines and Hi-Rail Vehicles § 214.509...
Smart call box field operational test evaluation : subtest reports
DOT National Transportation Integrated Search
1997-05-01
Smart call boxes are an enhanced version of devices used as emergency call boxes in California. The overall system consists of a microprocessor, a cellular communications transceiver, solar power sources, data collection devices, maintenance computer...
Smart call box field operational test evaluation : summary report
DOT National Transportation Integrated Search
1997-05-01
Smart call boxes are an enhanced version of devices used as emergency call boxes in California. The overall system consists of a microprocessor, a cellular communications transceiver, solar power sources, data collection devices, maintenance computer...
Application of optical character recognition in thermal image processing
NASA Astrophysics Data System (ADS)
Chan, W. T.; Sim, K. S.; Tso, C. P.
2011-07-01
This paper presents the results of a study on the reliability of the thermal imager compared to other devices that are used in preventive maintenance. Several case studies are used to facilitate the comparisons. When any device is found to perform unsatisfactorily where there is a suspected fault, its short-fall is determined so that the other devices may compensate, if possible. This study discovered that the thermal imager is not suitable or efficient enough for systems that happen to have little contrast in temperature between its parts or small but important parts that have their heat signatures obscured by those from other parts. The thermal imager is also found to be useful for preliminary examinations of certain systems, after which other more economical devices are suitable substitutes for further examinations. The findings of this research will be useful to the design and planning of preventive maintenance routines for industrial benefits.
Validation of scores of use of inhalation devices: valoration of errors *
Zambelli-Simões, Letícia; Martins, Maria Cleusa; Possari, Juliana Carneiro da Cunha; Carvalho, Greice Borges; Coelho, Ana Carla Carvalho; Cipriano, Sonia Lucena; de Carvalho-Pinto, Regina Maria; Cukier, Alberto; Stelmach, Rafael
2015-01-01
Abstract Objective: To validate two scores quantifying the ability of patients to use metered dose inhalers (MDIs) or dry powder inhalers (DPIs); to identify the most common errors made during their use; and to identify the patients in need of an educational program for the use of these devices. Methods: This study was conducted in three phases: validation of the reliability of the inhaler technique scores; validation of the contents of the two scores using a convenience sample; and testing for criterion validation and discriminant validation of these instruments in patients who met the inclusion criteria. Results: The convenience sample comprised 16 patients. Interobserver disagreement was found in 19% and 25% of the DPI and MDI scores, respectively. After expert analysis on the subject, the scores were modified and were applied in 72 patients. The most relevant difficulty encountered during the use of both types of devices was the maintenance of total lung capacity after a deep inhalation. The degree of correlation of the scores by observer was 0.97 (p < 0.0001). There was good interobserver agreement in the classification of patients as able/not able to use a DPI (50%/50% and 52%/58%; p < 0.01) and an MDI (49%/51% and 54%/46%; p < 0.05). Conclusions: The validated scores allow the identification and correction of inhaler technique errors during consultations and, as a result, improvement in the management of inhalation devices. PMID:26398751
Augmented reality application utility for aviation maintenance work instruction
NASA Astrophysics Data System (ADS)
Pourcho, John Bryan
Current aviation maintenance work instructions do not display information effectively enough to prevent costly errors and safety concerns. Aircraft are complex assemblies of highly interrelated components that confound troubleshooting and can make the maintenance procedure difficult (Drury & Gramopadhye, 2001). The sophisticated nature of aircraft maintenance necessitates a revolutionized training intervention for aviation maintenance technicians (United States General Accounting Office, 2003). Quite simply, the paper based job task cards fall short of offering rapid access to technical data and the system or component visualization necessary for working on complex integrated aircraft systems. Possible solutions to this problem include upgraded standards for paper based task cards and the use of integrated 3D product definition used on various mobile platforms (Ropp, Thomas, Lee, Broyles, Lewin, Andreychek, & Nicol, 2013). Previous studies have shown that incorporation of 3D graphics in work instructions allow the user to more efficiently and accurately interpret maintenance information (Jackson & Batstone, 2008). For aircraft maintenance workers, the use of mobile 3D model-based task cards could make current paper task card standards obsolete with their ability to deliver relevant, synchronized information to and from the hangar. Unlike previous versions of 3D model-based definition task cards and paper task cards, which are currently used in the maintenance industry, 3D model based definition task cards have the potential to be more mobile and accessible. Utilizing augmented reality applications on mobile devices to seamlessly deliver 3D product definition on mobile devices could increase the efficiency, accuracy, and reduce the mental workload for technicians when performing maintenance tasks (Macchiarella, 2004). This proposal will serve as a literary review of the aviation maintenance industry, the spatial ability of maintenance technicians, and benefits of modern digital hardware to educate, point out gaps in research, and observe possible foundations on which to build the future of aviation maintenance job task cards leading to a the methodology of the proposed study.
49 CFR 393.25 - Requirements for lamps other than head lamps.
Code of Federal Regulations, 2010 CFR
2010-10-01
... booms, backhoes, and winches) prevents compliance with this paragraph by any required lamp, an auxiliary... SAE J845—Optical Warning Devices for Authorized Emergency, Maintenance and Service Vehicles, May 1997... Authorized Emergency, Maintenance and Service Vehicles, January 2005. Amber gaseous discharge warning lamps...
49 CFR 393.25 - Requirements for lamps other than head lamps.
Code of Federal Regulations, 2011 CFR
2011-10-01
... booms, backhoes, and winches) prevents compliance with this paragraph by any required lamp, an auxiliary... SAE J845—Optical Warning Devices for Authorized Emergency, Maintenance and Service Vehicles, May 1997... Authorized Emergency, Maintenance and Service Vehicles, January 2005. Amber gaseous discharge warning lamps...
Wireless Time Tracking Improves Productivity at CSU Long Beach.
ERIC Educational Resources Information Center
Charmack, Scott; Walsh, Randy
2002-01-01
Describes California State University Long Beach's implementation of new maintenance management software, which integrated maintenance, inventory control, and key control and allows technicians to enter and receive information through handheld wireless devices for more accurate time accounting. The school estimates a 10 percent increase in…
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
...] Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive December 17, 2010. AGENCY: Federal Energy Regulatory Commission..., voltage and current sensing devices, station batteries and DC control circuitry). By contrast, the...
49 CFR 393.25 - Requirements for lamps other than head lamps.
Code of Federal Regulations, 2013 CFR
2013-10-01
... booms, backhoes, and winches) prevents compliance with this paragraph by any required lamp, an auxiliary... SAE J845—Optical Warning Devices for Authorized Emergency, Maintenance and Service Vehicles, May 1997... Authorized Emergency, Maintenance and Service Vehicles, January 2005. Amber gaseous discharge warning lamps...
49 CFR 393.25 - Requirements for lamps other than head lamps.
Code of Federal Regulations, 2014 CFR
2014-10-01
... booms, backhoes, and winches) prevents compliance with this paragraph by any required lamp, an auxiliary... SAE J845—Optical Warning Devices for Authorized Emergency, Maintenance and Service Vehicles, May 1997... Authorized Emergency, Maintenance and Service Vehicles, January 2005. Amber gaseous discharge warning lamps...
49 CFR 393.25 - Requirements for lamps other than head lamps.
Code of Federal Regulations, 2012 CFR
2012-10-01
... booms, backhoes, and winches) prevents compliance with this paragraph by any required lamp, an auxiliary... SAE J845—Optical Warning Devices for Authorized Emergency, Maintenance and Service Vehicles, May 1997... Authorized Emergency, Maintenance and Service Vehicles, January 2005. Amber gaseous discharge warning lamps...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...
What Pacemakers Can Teach Us about the Ethics of Maintaining Artificial Organs.
Hutchison, Katrina; Sparrow, Robert
2016-11-01
One day soon it may be possible to replace a failing heart, liver, or kidney with a long-lasting mechanical replacement or perhaps even with a 3-D printed version based on the patient's own tissue. Such artificial organs could make transplant waiting lists and immunosuppression a thing of the past. Supposing that this happens, what will the ongoing care of people with these implants involve? In particular, how will the need to maintain the functioning of artificial organs over an extended period affect patients and their doctors and the responsibilities of those who manufacture such devices? Drawing on lessons from the history of the cardiac pacemaker, this article offers an initial survey of the ethical issues posed by the need to maintain and service artificial organs. We briefly outline the nature and history of cardiac pacemakers, with a particular focus on the need for technical support, maintenance, and replacement of these devices. Drawing on the existing medical literature and on our conversations and correspondence with cardiologists, regulators, and manufacturers, we describe five sources of ethical issues associated with pacemaker maintenance: the location of the devices inside the human body, such that maintenance generates surgical risks; the complexity of the devices, which increases the risk of harms to patients as well as introducing potential injustices in access to treatment; the role of software-particularly software that can be remotely accessed-in the functioning of the devices, which generates privacy and security issues; the impact of continual development and improvement of the device; and the influence of commercial interests in the context of a medical device market in which there are several competing products. Finally, we offer some initial suggestions as to how these questions should be answered. © 2016 The Hastings Center.
Magasi, Susan; Wong, Alex; Miskovic, Ana; Tulsky, David; Heinemann, Allen W
2018-01-01
To test the effect that indicators of mobility device quality have on participation outcomes in community-dwelling adults with spinal cord injury, traumatic brain injury, and stroke by using structural equation modeling. Survey, cross-sectional study, and model testing. Clinical research space at 2 academic medical centers and 1 free-standing rehabilitation hospital. Community-dwelling adults (N=250; mean age, 48±14.3y) with spinal cord injury, traumatic brain injury, and stroke. Not applicable. The Mobility Device Impact Scale, Patient-Reported Outcomes Measurement Information System Social Function (version 2.0) scale, including Ability to Participate in Social Roles and Activities and Satisfaction with Social Roles and Activities, and the 2 Community Participation Indicators' enfranchisement scales. Details about device quality (reparability, reliability, ease of maintenance) and device type were also collected. Respondents used ambulation aids (30%), manual (34%), and power wheelchairs (30%). Indicators of device quality had a moderating effect on participation outcomes, with 3 device quality variables (repairability, ease of maintenance, device reliability) accounting for 20% of the variance in participation. Wheelchair users reported lower participation enfranchisement than did ambulation aid users. Mobility device quality plays an important role in participation outcomes. It is critical that people have access to mobility devices and that these devices be reliable. Copyright © 2017 American Congress of Rehabilitation Medicine. Published by Elsevier Inc. All rights reserved.
Naiman, Melissa; Markota, Andrej; Hegazy, Ahmed; Dingley, John; Kulstad, Erik
2018-03-01
Core temperature management is an important aspect of critical care; preventing unintentional hypothermia, reducing fever, and inducing therapeutic hypothermia when appropriate are each tied to positive health outcomes. The purpose of this study is to evaluate the performance of a new temperature management device that uses the esophageal environment to conduct heat transfer. De-identified patient data were aggregated from three clinical sites where an esophageal heat transfer device (EHTD) was used to provide temperature management. The device was evaluated against temperature management guidelines and best practice recommendations, including performance during induction, maintenance, and cessation of therapy. Across all active cooling protocols, the average time-to-target was 2.37 h and the average maintenance phase was 22.4 h. Patients spent 94.9% of the maintenance phase within ±1.0°C and 67.2% within ±0.5°C (574 and 407 measurements, respectively, out of 605 total). For warming protocols, all of the patient temperature readings remained above 36°C throughout the surgical procedure (average 4.66 h). The esophageal heat transfer device met performance expectations across a range of temperature management applications in intensive care and burn units. Patients met and maintained temperature goals without any reported adverse events.
14 CFR 91.1023 - Program operating manual requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., it must ensure there is a compatible reading device available to those persons that provides a legible image of the maintenance information and instructions, or a system that is able to retrieve the maintenance information and instructions in the English language. (h) If a program manager conducts aircraft...
46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Operational readiness, maintenance, and inspection of lifesaving equipment. 28.140 Section 28.140 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation...
46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Operational readiness, maintenance, and inspection of lifesaving equipment. 28.140 Section 28.140 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation...
Developing a Predictive Model for Facility Repair Costs on United States Air Force Installations
2011-06-01
repair activities at different times ( Durango & Madanat, 2002). Christian and Pandeya (1997) define maintenance as “the effort to keep a device or...Washington DC: Secretary of the Air Force, Financial Management. Durango , P. L., & Madanat, S. M. (2002). Optimal maintenance and repair policies in
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...
19 CFR 181.12 - Maintenance and availability of records.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 19 Customs Duties 2 2011-04-01 2011-04-01 false Maintenance and availability of records. 181.12 Section 181.12 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY... or in automated record storage devices (for example, magnetic discs and tapes) if associated computer...
19 CFR 181.12 - Maintenance and availability of records.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 19 Customs Duties 2 2013-04-01 2013-04-01 false Maintenance and availability of records. 181.12 Section 181.12 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY... or in automated record storage devices (for example, magnetic discs and tapes) if associated computer...
19 CFR 181.12 - Maintenance and availability of records.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 19 Customs Duties 2 2012-04-01 2012-04-01 false Maintenance and availability of records. 181.12 Section 181.12 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY... or in automated record storage devices (for example, magnetic discs and tapes) if associated computer...
19 CFR 181.12 - Maintenance and availability of records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 19 Customs Duties 2 2010-04-01 2010-04-01 false Maintenance and availability of records. 181.12 Section 181.12 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY... or in automated record storage devices (for example, magnetic discs and tapes) if associated computer...
Furberg, Robert D; Ortiz, Alexa M; Zulkiewicz, Brittany A; Hudson, Jordan P; Taylor, Olivia M; Lewis, Megan A
2016-06-27
Tablet-based health care interventions have the potential to encourage patient care in a timelier manner, allow physicians convenient access to patient records, and provide an improved method for patient education. However, along with the continued adoption of tablet technologies, there is a concomitant need to develop protocols focusing on the configuration, management, and maintenance of these devices within the health care setting to support the conduct of clinical research. Develop three protocols to support tablet configuration, tablet management, and tablet maintenance. The Configurator software, Tile technology, and current infection control recommendations were employed to develop three distinct protocols for tablet-based digital health interventions. Configurator is a mobile device management software specifically for iPhone operating system (iOS) devices. The capabilities and current applications of Configurator were reviewed and used to develop the protocol to support device configuration. Tile is a tracking tag associated with a free mobile app available for iOS and Android devices. The features associated with Tile were evaluated and used to develop the Tile protocol to support tablet management. Furthermore, current recommendations on preventing health care-related infections were reviewed to develop the infection control protocol to support tablet maintenance. This article provides three protocols: the Configurator protocol, the Tile protocol, and the infection control protocol. These protocols can help to ensure consistent implementation of tablet-based interventions, enhance fidelity when employing tablets for research purposes, and serve as a guide for tablet deployments within clinical settings.
Hotspot and sampling analysis for effective maintenance and performance monitoring.
DOT National Transportation Integrated Search
2017-05-01
In this project, we propose two sampling methods addressing how much and where the agencies need to collect infrastraucture condition data for accurate Level-of-Maintenance (LOM) estimation in maintenance network with single type or multiple ty...
Progress towards two double-dot qubits in Si/SiGe: quadruple quantum dots
NASA Astrophysics Data System (ADS)
Foote, Ryan H.; Ward, Daniel R.; Kim, Dohun; Thorgrimsson, Brandur; Smith, Luke; Savage, D. E.; Lagally, M. G.; Friesen, Mark; Coppersmith, S. N.; Eriksson, M. A.
We present the fabrication and electrical characterization of two types of gate-defined quadruple quantum dot devices formed in Si/SiGe heterostructures. We compare two designs, one which uses three layers of tightly overlapping gates and is similar to the work found in, and one which uses only two layers of gates and has significantly more open space between neighboring gates. We demonstrate charge-state conditional quantum oscillations in the more open device, we compare the tunability of both devices with each other, and we discuss the implications of these measurements on a path towards larger numbers of coupled quantum dot qubits. This work is supported in part by ARO (W911NF-12-1-0607), NSF (DMR-1206915, PHY-1104660), ONR (N00014-15-1-0029) and the Department of Defense. Development and maintenance of the growth facilities used for fabricating samples supported by DOE (DE-FG02-03ER46028). DK acknowledges support from the Korea Institute of Science and Technology Institutional Program (Project No. 2E26681). This research utilized facilities supported by the NSF (DMR-0832760, DMR-1121288).
3D printing and milling a real-time PCR device for infectious disease diagnostics.
Mulberry, Geoffrey; White, Kevin A; Vaidya, Manjusha; Sugaya, Kiminobu; Kim, Brian N
2017-01-01
Diagnosing infectious diseases using quantitative polymerase chain reaction (qPCR) offers a conclusive result in determining the infection, the strain or type of pathogen, and the level of infection. However, due to the high-cost instrumentation involved and the complexity in maintenance, it is rarely used in the field to make a quick turnaround diagnosis. In order to provide a higher level of accessibility than current qPCR devices, a set of 3D manufacturing methods is explored as a possible option to fabricate a low-cost and portable qPCR device. The key advantage of this approach is the ability to upload the digital format of the design files on the internet for wide distribution so that people at any location can simply download and feed into their 3D printers for quick manufacturing. The material and design are carefully selected to minimize the number of custom parts that depend on advanced manufacturing processes which lower accessibility. The presented 3D manufactured qPCR device is tested with 20-μL samples that contain various concentrations of lentivirus, the same type as HIV. A reverse-transcription step is a part of the device's operation, which takes place prior to the qPCR step to reverse transcribe the target RNA from the lentivirus into complementary DNA (cDNA). This is immediately followed by qPCR which quantifies the target sequence molecules in the sample during the PCR amplification process. The entire process of thermal control and time-coordinated fluorescence reading is automated by closed-loop feedback and a microcontroller. The resulting device is portable and battery-operated, with a size of 12 × 7 × 6 cm3 and mass of only 214 g. By uploading and sharing the design files online, the presented low-cost qPCR device may provide easier access to a robust diagnosis protocol for various infectious diseases, such as HIV and malaria.
49 CFR 236.564 - Acknowledging time.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.564 Acknowledging time. Acknowledging time of intermittent automatic train-stop device shall be not more than 30 seconds. ...
49 CFR 236.830 - Time, acknowledging.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.830 Time, acknowledging. As applied to an intermittent automatic train stop system, a predetermined time within which an automatic brake application may be forestalled by means of the acknowledging device. ...
49 CFR 236.730 - Coil, receiver.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.730 Coil, receiver. Concentric layers of insulated wire wound around the core of a receiver of an automatic train stop, train control or cab signal device on a locomotive. ...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Records of inspection and maintenance of radiographic... instruments. 34.73 Section 34.73 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.73...
Generalized Training Devices for Avionic Systems Maintenance.
ERIC Educational Resources Information Center
Parker, Edward L.
A research study was conducted to determine the feasibility and desirability of developing generalized training equipment for use in avionic systems maintenance training. The study consisted of a group of survey and analytic tasks to provide useful guidance to serve the needs of the Naval Aviation community in future years. The study had four…
Stakeholder challenges in purchasing medical devices for patient safety.
Hinrichs, Saba; Dickerson, Terry; Clarkson, John
2013-03-01
This study identifies the stakeholders who have a role in medical device purchasing within the wider system of health-care delivery and reports on their particular challenges to promote patient safety during purchasing decisions. Data was collected through observational work, participatory workshops, and semi-structured qualitative interviews, which were analyzed and coded. The study takes a systems-based and engineering design approach to the study. Five hospitals took part in this study, and the participants included maintenance, training, clinical end-users, finance, and risk departments. The main stakeholders for purchasing were identified to be staff from clinical engineering (Maintenance), device users (Clinical), device trainers (Training), and clinical governance for analyzing incidents involving devices (Risk). These stakeholders display varied characteristics in terms of interpretation of their own roles, competencies for selecting devices, awareness and use of resources for purchasing devices, and attitudes toward the purchasing process. The role of "clinical engineering" is seen by these stakeholders to be critical in mediating between training, technical, and financial stakeholders but not always recognized in practice. The findings show that many device purchasing decisions are tackled in isolation, which is not optimal for decisions requiring knowledge that is currently distributed among different people within different departments. The challenges expressed relate to the wider system of care and equipment management, calling for a more systemic view of purchasing for medical devices.
A Battery-Aware Algorithm for Supporting Collaborative Applications
NASA Astrophysics Data System (ADS)
Rollins, Sami; Chang-Yit, Cheryl
Battery-powered devices such as laptops, cell phones, and MP3 players are becoming ubiquitous. There are several significant ways in which the ubiquity of battery-powered technology impacts the field of collaborative computing. First, applications such as collaborative data gathering, become possible. Also, existing applications that depend on collaborating devices to maintain the system infrastructure must be reconsidered. Fundamentally, the problem lies in the fact that collaborative applications often require end-user computing devices to perform tasks that happen in the background and are not directly advantageous to the user. In this work, we seek to better understand how laptop users use the batteries attached to their devices and analyze a battery-aware alternative to Gnutella’s ultrapeer selection algorithm. Our algorithm provides insight into how system maintenance tasks can be allocated to battery-powered nodes. The most significant result of our study indicates that a large portion of laptop users can participate in system maintenance without sacrificing any of their battery. These results show great promise for existing collaborative applications as well as new applications, such as collaborative data gathering, that rely upon battery-powered devices.
Schmier, Jordana K; Lau, Edmund C; Patel, Jasmine D; Klenk, Juergen A; Greenspon, Arnold J
2017-11-01
The effects of device and patient characteristics on health and economic outcomes in patients with cardiac implantable electronic devices (CIEDs) are unclear. Modeling can estimate costs and outcomes for patients with CIEDs under a variety of scenarios, varying battery longevity, comorbidities, and care settings. The objective of this analysis was to compare changes in patient outcomes and payer costs attributable to increases in battery life of implantable cardiac defibrillators (ICDs) and cardiac resynchronization therapy defibrillators (CRT-D). We developed a Monte Carlo Markov model simulation to follow patients through primary implant, postoperative maintenance, generator replacement, and revision states. Patients were simulated in 3-month increments for 15 years or until death. Key variables included Charlson Comorbidity Index, CIED type, legacy versus extended battery longevity, mortality rates (procedure and all-cause), infection and non-infectious complication rates, and care settings. Costs included procedure-related (facility and professional), maintenance, and infections and non-infectious complications, all derived from Medicare data (2004-2014, 5% sample). Outcomes included counts of battery replacements, revisions, infections and non-infectious complications, and discounted (3%) costs and life years. An increase in battery longevity in ICDs yielded reductions in numbers of revisions (by 23%), battery changes (by 44%), infections (by 23%), non-infectious complications (by 10%), and total costs per patient (by 9%). Analogous reductions for CRT-Ds were 23% (revisions), 32% (battery changes), 22% (infections), 8% (complications), and 10% (costs). Based on modeling results, as battery longevity increases, patients experience fewer adverse outcomes and healthcare costs are reduced. Understanding the magnitude of the cost benefit of extended battery life can inform budgeting and planning decisions by healthcare providers and insurers.
[Web-based support system for medical device maintenance].
Zhao, Jinhai; Hou, Wensheng; Chen, Haiyan; Tang, Wei; Wang, Yihui
2015-01-01
A Web-based technology system was put forward aiming at the actual problems of the long maintenance cycle and the difficulties of the maintenance and repairing of medical equipments. Based on analysis of platform system structure and function, using the key technologies such as search engine, BBS, knowledge base and etc, a platform for medical equipment service technician to use by online or offline was designed. The platform provides users with knowledge services and interactive services, enabling users to get a more ideal solution.
DOT National Transportation Integrated Search
2013-02-01
The United States experiences over 700 fatalities and over 37,000 injuries each year in temporary : construction and maintenance work zones. The Federal Highway Administration (FHWA) has implemented : Temporary Traffic Control Devices 23 CFR 630 Subp...
49 CFR 236.809 - Signal, slotted mechanical.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Signal, slotted mechanical. 236.809 Section 236..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.809 Signal, slotted mechanical. A mechanically operated signal with an electromagnetic device...
Evaluation Of Traffic Control Devices For Rural High-Speed Maintenance Work Zones
DOT National Transportation Integrated Search
2000-10-01
This report documents the first year activities of a two-year project in which various work zone traffic control devices, treatments, and practices were implemented and evaluated. The focus was on rural high-speed work zones. Nine work zones were stu...
DOT National Transportation Integrated Search
2013-01-01
Orange plastic drums are common on Florida roadways, warning motorists and guiding them safely through work zones. The orange color is mandated by the Manual on Uniform Traffic Control Devices, which also requires that drums bear retroreflective whit...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
49 CFR 236.809 - Signal, slotted mechanical.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Signal, slotted mechanical. 236.809 Section 236..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.809 Signal, slotted mechanical. A mechanically operated signal with an electromagnetic device...
49 CFR 236.809 - Signal, slotted mechanical.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Signal, slotted mechanical. 236.809 Section 236..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.809 Signal, slotted mechanical. A mechanically operated signal with an electromagnetic device...
49 CFR 236.809 - Signal, slotted mechanical.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Signal, slotted mechanical. 236.809 Section 236..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.809 Signal, slotted mechanical. A mechanically operated signal with an electromagnetic device...
Maintenance Manual for the Automated Airdrop Information Retrieval System; Human Factors Database
1994-09-01
Sensorimotor Abilities Loss of Cognitive/Perceptual Abilities Treatment drug therapy physical therapy cognitive therapy biofeedback therapy 63 9...Device (AOD) Oxygen System oxygen mask oxygen hose oxygen cylinders on/off valve prebreather Floatation Devices life preserver Scuba Gear Ankle Braces
Furberg, Robert D; Zulkiewicz, Brittany A; Hudson, Jordan P; Taylor, Olivia M; Lewis, Megan A
2016-01-01
Background Tablet-based health care interventions have the potential to encourage patient care in a timelier manner, allow physicians convenient access to patient records, and provide an improved method for patient education. However, along with the continued adoption of tablet technologies, there is a concomitant need to develop protocols focusing on the configuration, management, and maintenance of these devices within the health care setting to support the conduct of clinical research. Objective Develop three protocols to support tablet configuration, tablet management, and tablet maintenance. Methods The Configurator software, Tile technology, and current infection control recommendations were employed to develop three distinct protocols for tablet-based digital health interventions. Configurator is a mobile device management software specifically for iPhone operating system (iOS) devices. The capabilities and current applications of Configurator were reviewed and used to develop the protocol to support device configuration. Tile is a tracking tag associated with a free mobile app available for iOS and Android devices. The features associated with Tile were evaluated and used to develop the Tile protocol to support tablet management. Furthermore, current recommendations on preventing health care–related infections were reviewed to develop the infection control protocol to support tablet maintenance. Results This article provides three protocols: the Configurator protocol, the Tile protocol, and the infection control protocol. Conclusions These protocols can help to ensure consistent implementation of tablet-based interventions, enhance fidelity when employing tablets for research purposes, and serve as a guide for tablet deployments within clinical settings. PMID:27350013
Code of Federal Regulations, 2014 CFR
2014-07-01
... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous... maintenance requirements that apply to me? (a) For each by-product coke oven battery, you must demonstrate... each coke oven battery with a capture system or control device applied to pushing emissions, you must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous... maintenance requirements that apply to me? (a) For each by-product coke oven battery, you must demonstrate... each coke oven battery with a capture system or control device applied to pushing emissions, you must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous... maintenance requirements that apply to me? (a) For each by-product coke oven battery, you must demonstrate... each coke oven battery with a capture system or control device applied to pushing emissions, you must...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous... maintenance requirements that apply to me? (a) For each by-product coke oven battery, you must demonstrate... each coke oven battery with a capture system or control device applied to pushing emissions, you must...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous... maintenance requirements that apply to me? (a) For each by-product coke oven battery, you must demonstrate... each coke oven battery with a capture system or control device applied to pushing emissions, you must...
49 CFR 214.525 - Towing with on-track roadway maintenance machines or hi-rail vehicles.
Code of Federal Regulations, 2014 CFR
2014-10-01
... other coupling device that provides a safe and secure attachment. (b) An on-track roadway maintenance... towing would cause the machine or hi-rail vehicle to exceed the capabilities of its braking system. In determining the limit of the braking system, the employer must consider the track grade (slope), as well as...
49 CFR 214.525 - Towing with on-track roadway maintenance machines or hi-rail vehicles.
Code of Federal Regulations, 2013 CFR
2013-10-01
... other coupling device that provides a safe and secure attachment. (b) An on-track roadway maintenance... towing would cause the machine or hi-rail vehicle to exceed the capabilities of its braking system. In determining the limit of the braking system, the employer must consider the track grade (slope), as well as...
49 CFR 236.534 - Entrance to equipped territory; requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.534... not exceed restricted speed, the automatic train stop, train control, or cab signal device shall be...
49 CFR 236.562 - Minimum rail current required.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.562 Minimum... continuous inductive automatic train stop or train control device to normal condition or to obtain a proceed...
49 CFR 236.534 - Entrance to equipped territory; requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.534... not exceed restricted speed, the automatic train stop, train control, or cab signal device shall be...
49 CFR 236.562 - Minimum rail current required.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.562 Minimum... continuous inductive automatic train stop or train control device to normal condition or to obtain a proceed...
49 CFR Appendix A to Part 1511 - Aviation Security Infrastructure Fee
Code of Federal Regulations, 2011 CFR
2011-10-01
... final acceptance testing. This includes such equipment as Metal Detection Devices, Hand Wands, X-ray... such equipment as Metal Detection Devices, Hand Wands, X-ray screening machines, Explosives Trace... as test objects and X-ray radiation surveys, electricity costs and maintenance contract costs...
DOT National Transportation Integrated Search
2013-02-01
The United States experiences over 700 fatalities and over 37,000 injuries each year in : temporary construction and maintenance work zones. The Federal Highway Administration : (FHWA) has implemented Temporary Traffic Control Devices 23 CFR 630 Subp...
49 CFR 236.771 - Machine, control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Machine, control. 236.771 Section 236.771..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.771 Machine, control. An assemblage of manually operated devices for controlling the functions of a traffic...
49 CFR 236.771 - Machine, control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Machine, control. 236.771 Section 236.771..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.771 Machine, control. An assemblage of manually operated devices for controlling the functions of a traffic...
49 CFR 236.771 - Machine, control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Machine, control. 236.771 Section 236.771..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.771 Machine, control. An assemblage of manually operated devices for controlling the functions of a traffic...
49 CFR 236.771 - Machine, control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Machine, control. 236.771 Section 236.771..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.771 Machine, control. An assemblage of manually operated devices for controlling the functions of a traffic...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...
DOT National Transportation Integrated Search
2013-07-01
This report documents the efforts and results of a number of studies and evaluations performed by TTI : researchers to evaluate the effect and value of steady-burn warning lights on temporary traffic control : devices used to delineate the correct tr...
Code of Federal Regulations, 2013 CFR
2013-01-01
... devices, transport and storage containers, associated equipment, source changers, and survey instruments... changers, and survey instruments. (a) The licensee shall perform visual and operability checks on survey... condition, that the sources are adequately shielded, and that required labeling is present. Survey...
Code of Federal Regulations, 2011 CFR
2011-01-01
... devices, transport and storage containers, associated equipment, source changers, and survey instruments... changers, and survey instruments. (a) The licensee shall perform visual and operability checks on survey... condition, that the sources are adequately shielded, and that required labeling is present. Survey...
Code of Federal Regulations, 2014 CFR
2014-01-01
... devices, transport and storage containers, associated equipment, source changers, and survey instruments... changers, and survey instruments. (a) The licensee shall perform visual and operability checks on survey... condition, that the sources are adequately shielded, and that required labeling is present. Survey...
Code of Federal Regulations, 2012 CFR
2012-01-01
... devices, transport and storage containers, associated equipment, source changers, and survey instruments... changers, and survey instruments. (a) The licensee shall perform visual and operability checks on survey... condition, that the sources are adequately shielded, and that required labeling is present. Survey...
Code of Federal Regulations, 2010 CFR
2010-01-01
... devices, transport and storage containers, associated equipment, source changers, and survey instruments... changers, and survey instruments. (a) The licensee shall perform visual and operability checks on survey... condition, that the sources are adequately shielded, and that required labeling is present. Survey...
30 CFR 48.25 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-rescue and respiratory devices. The course shall include instruction and demonstration in the use, care, and maintenance of self-rescue and respiratory devices, where applicable. (3) Transportation controls and communication systems. The course shall include instruction on the procedures in effect for riding...
30 CFR 48.25 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-rescue and respiratory devices. The course shall include instruction and demonstration in the use, care, and maintenance of self-rescue and respiratory devices, where applicable. (3) Transportation controls and communication systems. The course shall include instruction on the procedures in effect for riding...
30 CFR 48.25 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-rescue and respiratory devices. The course shall include instruction and demonstration in the use, care, and maintenance of self-rescue and respiratory devices, where applicable. (3) Transportation controls and communication systems. The course shall include instruction on the procedures in effect for riding...
30 CFR 48.25 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-rescue and respiratory devices. The course shall include instruction and demonstration in the use, care, and maintenance of self-rescue and respiratory devices, where applicable. (3) Transportation controls and communication systems. The course shall include instruction on the procedures in effect for riding...
49 CFR 236.553 - Seal, where required.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.553 Seal, where required. Seal shall be maintained on any device other than brake-pipe cut-out cock (double-heading cock), by...
49 CFR 236.553 - Seal, where required.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.553 Seal, where required. Seal shall be maintained on any device other than brake-pipe cut-out cock (double-heading cock), by...
49 CFR 236.567 - Restrictions imposed when device fails and/or is cut out en route.
Code of Federal Regulations, 2013 CFR
2013-10-01
... cut out en route. 236.567 Section 236.567 Transportation Other Regulations Relating to Transportation... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...
30 CFR 75.1502 - Mine emergency evacuation and firefighting program of instruction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emergency response; and (iii) The rapid assembly and transportation of necessary miners, fire suppression... self-rescue devices, including hands-on training in the complete donning and transferring of all types of self-rescue devices used at the mine. (3) The deployment, use, and maintenance of refuge...
30 CFR 75.1502 - Mine emergency evacuation and firefighting program of instruction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... emergency response; and (iii) The rapid assembly and transportation of necessary miners, fire suppression... self-rescue devices, including hands-on training in the complete donning and transferring of all types of self-rescue devices used at the mine. (3) The deployment, use, and maintenance of refuge...
49 CFR 236.586 - Daily or after trip test.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.586 Daily or after trip test..., each locomotive equipped with an automatic cab signal or train stop or train control device operating...
49 CFR 236.557 - Receiver; location with respect to rail.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.557 Receiver... automatic cab signal, train stop, or train control device of locomotive equipped with onboard test equipment...
49 CFR 236.586 - Daily or after trip test.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Locomotive § 236.586 Daily or after trip test..., each locomotive equipped with an automatic cab signal or train stop or train control device operating...
NASA Technical Reports Server (NTRS)
1972-01-01
The assembly drawings of the receiver unit are presented for the data compression/error correction digital test system. Equipment specifications are given for the various receiver parts, including the TV input buffer register, delta demodulator, TV sync generator, memory devices, and data storage devices.
49 CFR 229.25 - Tests: Every periodic inspection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... dead-weight tester or a test gauge designed for this purpose. (b) All electrical devices and visible... pre-maintenance test reveals that the device is not recording all the specified data and that all... 49 Transportation 4 2013-10-01 2013-10-01 false Tests: Every periodic inspection. 229.25 Section...
49 CFR 229.25 - Tests: Every periodic inspection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... dead-weight tester or a test gauge designed for this purpose. (b) All electrical devices and visible... pre-maintenance test reveals that the device is not recording all the specified data and that all... 49 Transportation 4 2012-10-01 2012-10-01 false Tests: Every periodic inspection. 229.25 Section...
49 CFR 229.25 - Tests: Every periodic inspection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... dead-weight tester or a test gauge designed for this purpose. (b) All electrical devices and visible... pre-maintenance test reveals that the device is not recording all the specified data and that all... 49 Transportation 4 2014-10-01 2014-10-01 false Tests: Every periodic inspection. 229.25 Section...
49 CFR 236.721 - Circuit, control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Circuit, control. 236.721 Section 236.721..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.721 Circuit, control. An electrical circuit between a source of electric energy and a device which it operates. ...
49 CFR 236.721 - Circuit, control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Circuit, control. 236.721 Section 236.721..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.721 Circuit, control. An electrical circuit between a source of electric energy and a device which it operates. ...
49 CFR 236.721 - Circuit, control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Circuit, control. 236.721 Section 236.721..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.721 Circuit, control. An electrical circuit between a source of electric energy and a device which it operates. ...
49 CFR 236.721 - Circuit, control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Circuit, control. 236.721 Section 236.721..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.721 Circuit, control. An electrical circuit between a source of electric energy and a device which it operates. ...
3D printing and milling a real-time PCR device for infectious disease diagnostics
Mulberry, Geoffrey; White, Kevin A.; Vaidya, Manjusha; Sugaya, Kiminobu
2017-01-01
Diagnosing infectious diseases using quantitative polymerase chain reaction (qPCR) offers a conclusive result in determining the infection, the strain or type of pathogen, and the level of infection. However, due to the high-cost instrumentation involved and the complexity in maintenance, it is rarely used in the field to make a quick turnaround diagnosis. In order to provide a higher level of accessibility than current qPCR devices, a set of 3D manufacturing methods is explored as a possible option to fabricate a low-cost and portable qPCR device. The key advantage of this approach is the ability to upload the digital format of the design files on the internet for wide distribution so that people at any location can simply download and feed into their 3D printers for quick manufacturing. The material and design are carefully selected to minimize the number of custom parts that depend on advanced manufacturing processes which lower accessibility. The presented 3D manufactured qPCR device is tested with 20-μL samples that contain various concentrations of lentivirus, the same type as HIV. A reverse-transcription step is a part of the device’s operation, which takes place prior to the qPCR step to reverse transcribe the target RNA from the lentivirus into complementary DNA (cDNA). This is immediately followed by qPCR which quantifies the target sequence molecules in the sample during the PCR amplification process. The entire process of thermal control and time-coordinated fluorescence reading is automated by closed-loop feedback and a microcontroller. The resulting device is portable and battery-operated, with a size of 12 × 7 × 6 cm3 and mass of only 214 g. By uploading and sharing the design files online, the presented low-cost qPCR device may provide easier access to a robust diagnosis protocol for various infectious diseases, such as HIV and malaria. PMID:28586401
Damage estimation of sewer pipe using subtitles of CCTV inspection video
NASA Astrophysics Data System (ADS)
Park, Kitae; Kim, Byeongcheol; Kim, Taeheon; Seo, Dongwoo
2017-04-01
Recent frequent occurrence of urban sinkhole serves as a momentum of the periodic inspection of sewer pipelines. Sewer inspection using a CCTV device needs a lot of time and efforts. Many of previous studies which reduce the laborious tasks are mainly interested in the developments of image processing S/W and exploring H/W. And there has been no attempt to find meaningful information from the existing CCTV images stored by the sewer maintenance manager. This study adopts a cross-correlation based image processing method and extracts sewer inspection device's location data from CCTV images. As a result of the analysis of location-time relation, it show strong correlation between device stand time and the sewer damages. In case of using this method to investigate sewer inspection CCTV images, it will save the investigator's efforts and improve sewer maintenance efficiency and reliability.
2014-10-01
accountability of individual load con- sumption, forewarning of maintenance problems, and aware- ness of human activity based on electrical activity...accountability and maintenance examples were identified from our desks at MIT. Tech support can be anywhere and do the same. Human Activity DepNILM...provides awareness of human activity within a net- work. Each device has an electrical fingerprint, and specific de- vices imply associated human actions
NASA Technical Reports Server (NTRS)
Williams, R. J.; Mullins, O.
1976-01-01
Details are given for the construction and operation of a 101.3 kN/sq m (1 atmosphere) redox control system. A solid ceramic oxygen electrolyte cell is used to monitor the oxygen fugacity in the furnace. The system consists of a vertical quench, gas mixing furnace with heads designed for mounting the electrolyte cell and with facilities for inserting and removing the samples. The system also contains the high input impedance electronics necessary for measurements, a simplified version of a gas mixing apparatus, and devices for experiments under controlled rates of change relative to temperature and redox state. The calibration and maintenance of the system are discussed.
NASA Technical Reports Server (NTRS)
Williams, R. J.; Mullins, O.
1981-01-01
Details are given for the construction and operation of a 101.3 KN/sq meter (1 atmosphere) redox control system. A solid ceramic oxygen electrolyte cell is used to monitor the oxygen fugacity in the furnace. The system consists of a vertical quench gas mixing furnace with heads designed for mounting the electrolyte cell and with facilities for inserting and removing the samples, a simplified version of a gas mixing apparatus, and devices for experiments under controlled rates of change of temperature. A thermogravimetric analysis system employing these techniques of redox control and measurement is also described. The calibration and maintenance of the system are discussed.
Java Tool Framework for Automation of Hardware Commissioning and Maintenance Procedures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ho, J C; Fisher, J M; Gordon, J B
2007-10-02
The National Ignition Facility (NIF) is a 192-beam laser system designed to study high energy density physics. Each beam line contains a variety of line replaceable units (LRUs) that contain optics, stepping motors, sensors and other devices to control and diagnose the laser. During commissioning and subsequent maintenance of the laser, LRUs undergo a qualification process using the Integrated Computer Control System (ICCS) to verify and calibrate the equipment. The commissioning processes are both repetitive and tedious when we use remote manual computer controls, making them ideal candidates for software automation. Maintenance and Commissioning Tool (MCT) software was developed tomore » improve the efficiency of the qualification process. The tools are implemented in Java, leveraging ICCS services and CORBA to communicate with the control devices. The framework provides easy-to-use mechanisms for handling configuration data, task execution, task progress reporting, and generation of commissioning test reports. The tool framework design and application examples will be discussed.« less
Caetano, F R; Carneiro, E A; Agustini, D; Figueiredo-Filho, L C S; Banks, C E; Bergamini, M F; Marcolino-Junior, L H
2018-01-15
Microfluidic devices constructed using low cost materials presents as alternative for conventional flow analysis systems because they provide advantages as low consumption of reagents and samples, high speed of analysis, possibility of portability and the easiness of construction and maintenance. Herein, is described for the first time the use of an electrochemical biosensor for phenol detection combined with a very simple and efficient microfluidic device based on commercial textile threads. Taking advantages of capillary phenomena and gravity forces, the solution transportation is promoted without any external forces or injection pump. Screen printed electrodes were modified with carbon nanotubes/gold nanoparticles followed by covalent binding of tyrosinase. After the biosensor electrochemical characterization by cyclic voltammetry technique, the optimization of relevant parameters such as pH, potential of detection and linear range for the biosensor performance was carried out; the system was evaluated for analytical phenol detection presenting limit of detection and limit of quantification 2.94nmolL -1 and 8.92nmolL -1 respectively. The proposed system was applied on phenol addition and recovery studies in drinking water, obtaining recoveries rates between 90% and 110%. Copyright © 2017 Elsevier B.V. All rights reserved.
49 CFR 236.560 - Contact element, mechanical trip type; location with respect to rail.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and.... Contact element of automatic train stop device of the mechanical trip type shall be maintained at a height...
49 CFR 236.567 - Restrictions imposed when device fails and/or is cut out en route.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... restricted speed or if an automatic block signal system is in operation according to signal indication but...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-22
... for implementation and continued use of a maintenance method that is designed to maintain pavement... method that is designed to maintain pavement marking retroreflectivity at or above the established levels... every pavement marking in its jurisdiction. Instead, agencies must implement methods designed to provide...
DOT National Transportation Integrated Search
2001-04-01
The purpose of this project was to develop and distribute a manual that would provide local agencies in Iowa with practical advice and guidance for traffic control devices and pavement markings installation and maintenance. The project included the f...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., inertial separators, afterburners, thermal or catalytic incinerators, adsorption devices (such as carbon... and calculation procedures (e.g., mass balance or stoichiometric calculations). (4) Maintenance and...
1985-09-01
TECHNIQUES THESIS Robert A. Heinlein Captain, USAF AFIT/GLM/LSM/855-32.- _ DTIC MU’noN ’ST.,TEMENT A A-ZELECTE Approved lt public teleo*I Al \\ Z #&N0V21...343" A FEASIBILITY STUDY OF THE COLLECTION OF UNSCHEDULED MAINTENANCE DATA USING STrATISTICAL SAMPLING TECHNIQUES THESIS L .9 Robe-t A. Heinlein...a AFIT/GLM/LSM/85S-32 A FEASIBILITY STUDY OF THE COLLECTION OF UNSCHEDULED MAINTENANCE DATA USING STATISTICAL SAMPLING TECHNIQUES THESIS
Physician-industry cooperation in the medical device industry.
Chatterji, Aaron K; Fabrizio, Kira R; Mitchell, Will; Schulman, Kevin A
2008-01-01
Anecdotal evidence suggests that innovative medical devices often arise from physicians' inventive activity, but no studies have documented the extent of such physician-engaged innovation. This paper uses patent data and the American Medical Association Physician Masterfile to provide evidence that physicians contribute to medical device innovation, accounting for almost 20 percent of approximately 26,000 medical device patents filed in the United States during 1990-1996. Moreover, two measures indicate that physician patents had more influence on subsequent inventive activity than nonphysician patents. This finding supports the maintenance of an open environment for physician-industry collaboration in the medical device discovery process.
Nuclear reactor insulation and preheat system
Wampole, Nevin C.
1978-01-01
An insulation and preheat system for preselected components of a fluid cooled nuclear reactor. A gas tight barrier or compartment of thermal insulation surrounds the selected components and includes devices to heat the internal atmosphere of the compartment. An external surface of the compartment or enclosure is cooled, such as by a circulating fluid. The heating devices provide for preheating of the components, as well as maintenance of a temperature sufficient to ensure that the reactor coolant fluid will not solidify during shutdown. The external cooling limits the heat transferred to other plant structures, such as supporting concrete and steel. The barrier is spaced far enough from the surrounded components so as to allow access for remote or manual inspection, maintenance, and repair.
Ultra-Low Power Optical Sensor for Xylophagous Insect Detection in Wood.
Perles, Angel; Mercado, Ricardo; Capella, Juan V; Serrano, Juan José
2016-11-23
The early detection of pests is key for the maintenance of high-value masterpieces and historical buildings made of wood. In this work, we the present detailed design of an ultra-low power sensor device that permits the continuous monitoring of the presence of termites and other xylophagous insects. The operating principle of the sensor is based on the variations of reflected light induced by the presence of termites, and specific processing algorithms that deal with the behavior of the electronics and the natural ageing of components. With a typical CR2032 lithium battery, the device lasts more than nine years, and is ideal for incorporation in more complex monitoring systems where maintenance tasks should be minimized.
Ultra-Low Power Optical Sensor for Xylophagous Insect Detection in Wood
Perles, Angel; Mercado, Ricardo; Capella, Juan V.; Serrano, Juan José
2016-01-01
The early detection of pests is key for the maintenance of high-value masterpieces and historical buildings made of wood. In this work, we the present detailed design of an ultra-low power sensor device that permits the continuous monitoring of the presence of termites and other xylophagous insects. The operating principle of the sensor is based on the variations of reflected light induced by the presence of termites, and specific processing algorithms that deal with the behavior of the electronics and the natural ageing of components. With a typical CR2032 lithium battery, the device lasts more than nine years, and is ideal for incorporation in more complex monitoring systems where maintenance tasks should be minimized. PMID:27886082
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... be in compliance with the operating limits for emission capture systems and add-on control devices...) You must maintain a log detailing the operation and maintenance of the emission capture systems, add... capture system and add-on control device performance tests have been completed, as specified in § 63.3160...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... compliance with the operating limits for emission capture systems and add-on control devices required by § 63... maintain a log detailing the operation and maintenance of the emission capture systems, add-on control... add-on control device performance tests have been completed, as specified in § 63.3160. (f) If your...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... be in compliance with the operating limits for emission capture systems and add-on control devices...) You must maintain a log detailing the operation and maintenance of the emission capture systems, add... capture system and add-on control device performance tests have been completed, as specified in § 63.3160...
40 CFR 63.3100 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... be in compliance with the operating limits for emission capture systems and add-on control devices...) You must maintain a log detailing the operation and maintenance of the emission capture systems, add... capture system and add-on control device performance tests have been completed, as specified in § 63.3160...
30 CFR 48.5 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the procedures for reporting hazards. (2) Self-rescue and respiratory devices. The course shall be... use, care, and maintenance of self-rescue and respiratory devices used at the mine; (ii) Hands-on... checkout system in effect at the mine; the procedures for riding on and in mine conveyances; the controls...
30 CFR 48.5 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the procedures for reporting hazards. (2) Self-rescue and respiratory devices. The course shall be... use, care, and maintenance of self-rescue and respiratory devices used at the mine; (ii) Hands-on... checkout system in effect at the mine; the procedures for riding on and in mine conveyances; the controls...
30 CFR 48.5 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the procedures for reporting hazards. (2) Self-rescue and respiratory devices. The course shall be... use, care, and maintenance of self-rescue and respiratory devices used at the mine; (ii) Hands-on... checkout system in effect at the mine; the procedures for riding on and in mine conveyances; the controls...
30 CFR 48.5 - Training of new miners; minimum courses of instruction; hours of instruction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the procedures for reporting hazards. (2) Self-rescue and respiratory devices. The course shall be... use, care, and maintenance of self-rescue and respiratory devices used at the mine; (ii) Hands-on... checkout system in effect at the mine; the procedures for riding on and in mine conveyances; the controls...
Code of Federal Regulations, 2010 CFR
2010-07-01
... tools and hardware required for its operation shall be stored at the foam generator. (2) Tools to open a...-expansion foam devices. 75.1103-9 Section 75.1103-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... and crosscuts; access doors; communications; fire crews; high-expansion foam devices. (a) The...
Code of Federal Regulations, 2014 CFR
2014-07-01
... tools and hardware required for its operation shall be stored at the foam generator. (2) Tools to open a...-expansion foam devices. 75.1103-9 Section 75.1103-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... and crosscuts; access doors; communications; fire crews; high-expansion foam devices. (a) The...
Code of Federal Regulations, 2013 CFR
2013-07-01
... tools and hardware required for its operation shall be stored at the foam generator. (2) Tools to open a...-expansion foam devices. 75.1103-9 Section 75.1103-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... and crosscuts; access doors; communications; fire crews; high-expansion foam devices. (a) The...
Code of Federal Regulations, 2011 CFR
2011-07-01
... tools and hardware required for its operation shall be stored at the foam generator. (2) Tools to open a...-expansion foam devices. 75.1103-9 Section 75.1103-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... and crosscuts; access doors; communications; fire crews; high-expansion foam devices. (a) The...
Code of Federal Regulations, 2012 CFR
2012-07-01
... tools and hardware required for its operation shall be stored at the foam generator. (2) Tools to open a...-expansion foam devices. 75.1103-9 Section 75.1103-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... and crosscuts; access doors; communications; fire crews; high-expansion foam devices. (a) The...
Reduced Physical Fidelity Training Device Concepts for Army Maintenance Training.
1978-09-01
rapidly. In addition, the task- orientet ’ nature of self-pacee training is creating a need f~r even more equipment to support this newer method of...substitution for AET devices might be considered, to specify the conceptual form for such RPF devices, and to provide proceduial guidance for the future ...describe the RPF alternatives that can be considered for future development by the Army, and to set forth a procedure for their evaluation. The
Testing high brightness LEDs relative to application environment
NASA Astrophysics Data System (ADS)
Singer, Jeffrey; Mangum, Scott; Lundberg, John
2006-08-01
Application of light emitting diodes is expanding as the luminous output and efficiencies of these devices improve. At the same time, the number of LED package types is increasing, making it challenging to determine the appropriate device for use in lighting product designs. A range of factors should be considered when selecting a LED for an application including color coordinates, luminous efficacy, cost, lumen maintenance, application life, packaging and manufacturability. Additional complexities can be introduced as LED packages become obsolete and replacement parts must be selected. The replacement LED characteristics must be understood and assessed against the parameters of the original device, in order to determine if the change will be relatively simple or will force other end-product changes. While some characteristics are readily measured and compared, other factors, such as lumen maintenance, are difficult to verify. This paper will discuss the characteristics of a LED that should be considered during the design process as well as methods to validate these characteristics, particularly those which are not typically on data sheets or, are critical to the design and warrant additional validation. Particular attention will be given to LED lumen maintenance. While published manufacturer data typically provides temperature versus performance curves, the data may not be useful depending upon the application's operating environment. Models must be created to estimate the LED's junction temperature and degradation curve at the applied temperature in order to develop a more precise life estimate. This paper presents one approach to a LED device life and performance study designed with application environments in mind.
Challenges in sensor development for the electric utility industry
NASA Astrophysics Data System (ADS)
Ward, Barry H.
1999-01-01
The electric utility industry is reducing operating costs in order to prepare for deregulation. The reduction in operating cost has meant a reduction in manpower. The ability to utilize remaining maintenance staff more effectively and to stay competitive in a deregulated environment has therefore become critical. In recent years, the industry has moved away from routine or periodic maintenance to predictive or condition based maintenance. This requires the assessment of equipment condition by frequent testing and inspection; a requirement that is incompatible with cost reduction. To overcome this dilemma, industry trends are toward condition monitoring, whereby the health of apparatus is monitored continuously. This requires the installation of sensors hr transducers on power equipment and the data taken forwarded to an intelligent device for further processing. These devices then analyze the data and make evaluations based on parameter levels or trends, in an attempt to predict possible deterioration. This continuous monitoring allows the electric utility to schedule maintenance on an as needed basis. The industry has been faced with many challenges in sensor design. The measurement of physical, chemical and electrical parameters under extreme conditions of electric fields, magnetic fields, temperature, corrosion, etc. is extensive. This paper will give an overview of these challenges and the solutions adopted for apparatus such as power transformers, circuit breakers, boilers, cables, batteries, and rotating machinery.
NASA Astrophysics Data System (ADS)
Viotti, Matias R.; Albertazzi, Armando; Staron, Peter; Pisa, Marcelo
2013-04-01
This paper shows a portable device to measure mainly residual stress fields outside the optical bench. This system combines the traditional hole drilling technique with Digital Speckle Pattern Interferometry. The novel feature of this device is the high degree of compaction since only one base supports simultaneously the measurement module and the hole-drilling device. The portable device allows the measurement of non-uniform residual stresses in accordance with the ASTM standard. In oil and gas offshore industries, alternative welding procedures among them, the friction hydro pillar processing (FHPP) is highlighted and nowadays is an important maintenance tool since it has the capability to produce structure repairs without risk of explosions. In this process a hole is drilled and filled with a consumable rod of the same material. The rod, which could be cylindrical or conical, is rotated and pressed against the hole, leading to frictional heating. In order to assess features about the residual stress distribution generated by the weld into the rod as well as into the base material around the rod, welded samples were evaluated by neutron diffraction and by the hole drilling technique having a comparison between them. For the hole drilling technique some layers were removed by using electrical discharge machining (EDM) after diffraction measurements in order to assess the bulk stress distribution. Results have shown a good agreement between techniques.
30 CFR 57.5066 - Maintenance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Physical Agents, and Diesel Particulate Matter Diesel Particulate Matter-Underground Only § 57.5066... manufacturer specifications; and (3) The operator must maintain any emission or particulate control device...
30 CFR 57.5066 - Maintenance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Physical Agents, and Diesel Particulate Matter Diesel Particulate Matter-Underground Only § 57.5066... manufacturer specifications; and (3) The operator must maintain any emission or particulate control device...
A passive cold storage device economic model to evaluate selected immunization location scenarios.
Norman, Bryan A; Nourollahi, Sevnaz; Chen, Sheng-I; Brown, Shawn T; Claypool, Erin G; Connor, Diana L; Schmitz, Michelle M; Rajgopal, Jayant; Wateska, Angela R; Lee, Bruce Y
2013-10-25
The challenge of keeping vaccines cold at health posts given the unreliability of power sources in many low- and middle-income countries and the expense and maintenance requirements of solar refrigerators has motivated the development of passive cold storage devices (PCDs), containers that keep vaccines cold without using an active energy source. With different PCDs under development, manufacturers, policymakers and funders need guidance on how varying different PCD characteristics may affect the devices' cost and utility. We developed an economic spreadsheet model representing the lowest two levels of a typical Expanded Program on Immunization (EPI) vaccine supply chain: a district store, the immunization locations that the district store serves, and the transport vehicles that operate between the district store and the immunization locations. The model compares the use of three vaccine storage device options [(1) portable PCDs, (2) stationary PCDs, or (3) solar refrigerators] and allows the user to vary different device (e.g., size and cost) and scenario characteristics (e.g., catchment area population size and vaccine schedule). For a sample set of select scenarios and equipment specification, we found the portable PCD to generally be better suited to populations of 5,000 or less. The stationary PCD replenished once per month can be a robust design especially with a 35L capacity and a cost of $2,500 or less. The solar device was generally a reasonable alternative for most of the scenarios explored if the cost was $2,100 or less (including installation). No one device type dominated over all explored circumstances. Therefore, the best device may vary from country-to-country and location-to-location within a country. This study introduces a quantitative model to help guide PCD development. Although our selected set of explored scenarios and device designs was not exhaustive, future explorations can further alter model input values to represent additional scenarios and device designs. Copyright © 2013 Elsevier Ltd. All rights reserved.
Zheng, Caixian; Zheng, Kun; Shen, Yunming; Wu, Yunyun
2016-01-01
The content related to the quality during life-cycle in operation of medical device includes daily use, repair volume, preventive maintenance, quality control and adverse event monitoring. In view of this, the article aims at discussion on the quality evaluation method of medical devices during their life cycle in operation based on the Analytic Hierarchy Process (AHP). The presented method is proved to be effective by evaluating patient monitors as example. The method presented in can promote and guide the device quality control work, and it can provide valuable inputs to decisions about purchase of new device.
SAFL Baffle retrofit for suspended sediment removal in storm sewer sumps.
Howard, Adam; Mohseni, Omid; Gulliver, John; Stefan, Heinz
2011-11-15
Standard sumps (manholes) provide a location for pipe junctions and maintenance access in stormwater drainage systems. Standard sumps can also remove sand and silt particles from stormwater, but have a high propensity for washout of the collected sediment. With appropriate maintenance these sumps may qualify as a stormwater best management practice (BMP) device for the removal of suspended sediment from stormwater runoff. To decrease the maintenance frequency and prevent standard sumps from becoming a source of suspended sediment under high flow conditions, a porous baffle, named the SAFL Baffle, has been designed and tested as a retrofit to the sump. Multiple configurations with varying percent open area and different angles of attack were evaluated in scale models. An optimum configuration was then constructed at the prototype scale and evaluated for both removal efficiency and washout. Results obtained with the retrofit indicate that with the right baffle dimensions and porosity, sediment washout from the sump at high flow rates can be almost eliminated, and removal efficiency can be significantly increased at low flow rates. Removal efficiency and washout functions have been developed for standard sumps retrofitted with the SAFL Baffle. The results of this research provide a new, versatile stormwater treatment device and implemented new washout and removal efficiency testing procedures that will improve research and development of stormwater treatment devices. Copyright © 2011 Elsevier Ltd. All rights reserved.
30 CFR 57.9313 - Roadway maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites...
Piping and tubing technology: A compilation
NASA Technical Reports Server (NTRS)
1971-01-01
A compilation on the devices, techniques, and methods used in piping and tubing technology is presented. Data cover the following: (1) a number of fittings, couplings, and connectors that are useful in joining tubing and piping and various systems, (2) a family of devices used where flexibility and/or vibration damping are necessary, (3) a number of devices found useful in the regulation and control of fluid flow, and (4) shop hints to aid in maintenance and repair procedures such as cleaning, flaring, and swaging of tubes.
A simple device for exteriorizing chronically implanted catheters in dogs.
Butterfield, J L; Decker, G E
1984-04-01
A device, consisting of a round base and cap made of polytetrafluoroethylene, was made to exteriorize and protect chronically implanted arterial and venous catheters in conscious dogs. In experiments lasting as long as 9 months, the subcutaneously implanted button-like appliance did not cause tissue reactions and was well tolerated by 98% of a group of 200 dogs. Being maintenance-free, having the capacity to exteriorize several catheter or wire outputs, and needing no protective harness were advantages of the device.
"Smart" Electromechanical Shock Absorber
NASA Technical Reports Server (NTRS)
Stokes, Lebarian; Glenn, Dean C.; Carroll, Monty B.
1989-01-01
Shock-absorbing apparatus includes electromechanical actuator and digital feedback control circuitry rather than springs and hydraulic damping as in conventional shock absorbers. Device not subject to leakage and requires little or no maintenance. Attenuator parameters adjusted in response to sensory feedback and predictive algorithms to obtain desired damping characteristic. Device programmed to decelerate slowly approaching vehicle or other large object according to prescribed damping characteristic.
Missile Systems Maintenance, AFSC 411XOB/C.
1988-04-01
technician’s rating. A statistical measurement of their agreement, known as the interrater reliability (as assessed through components of variance of...senior technician’s ratings. A statistical measurement of their agreement, known as the interrater reliability (as assessed through components of...FABRICATION TRANSITORS *INPUT/OUTPUT (PERIPHERAL) DEVICES SOLID-STATE SPECIAL PURPOSE DEVICES COMPUTER MICRO PROCESSORS AND PROGRAMS POWER SUPPLIES
Code of Federal Regulations, 2013 CFR
2013-07-01
... CEMS must be installed at both the inlet and outlet of the control device. If you are meeting a requirement to limit the concentration of CO, the CEMS must be installed at the outlet of the control device... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If...
Testing of Anesthesia Machines and Defibrillators in Healthcare Institutions.
Gurbeta, Lejla; Dzemic, Zijad; Bego, Tamer; Sejdic, Ervin; Badnjevic, Almir
2017-09-01
To improve the quality of patient treatment by improving the functionality of medical devices in healthcare institutions. To present the results of the safety and performance inspection of patient-relevant output parameters of anesthesia machines and defibrillators defined by legal metrology. This study covered 130 anesthesia machines and 161 defibrillators used in public and private healthcare institutions, during a period of two years. Testing procedures were carried out according to international standards and legal metrology legislative procedures in Bosnia and Herzegovina. The results show that in 13.84% of tested anesthesia machine and 14.91% of defibrillators device performance is not in accordance with requirements and should either have its results be verified, or the device removed from use or scheduled for corrective maintenance. Research emphasizes importance of independent safety and performance inspections, and gives recommendations for the frequency of inspection based on measurements. Results offer implications for adequacy of preventive and corrective maintenance performed in healthcare institutions. Based on collected data, the first digital electronical database of anesthesia machines and defibrillators used in healthcare institutions in Bosnia and Herzegovina is created. This database is a useful tool for tracking each device's performance over time.
Maintenance Process Strategic Analysis
NASA Astrophysics Data System (ADS)
Jasiulewicz-Kaczmarek, M.; Stachowiak, A.
2016-08-01
The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.
Practice makes perfect: self-reported adherence a positive marker of inhaler technique maintenance.
Azzi, Elizabeth; Srour, Pamela; Armour, Carol; Rand, Cynthia; Bosnic-Anticevich, Sinthia
2017-04-24
Poor inhaler technique and non-adherence to treatment are major problems in the management of asthma. Patients can be taught how to achieve good inhaler technique, however maintenance remains problematic, with 50% of patients unable to demonstrate correct technique. The aim of this study was to determine the clinical, patient-related and/or device-related factors that predict inhaler technique maintenance. Data from a quality-controlled longitudinal community care dataset was utilized. 238 patients using preventer medications where included. Data consisted of patient demographics, clinical data, medication-related factors and patient-reported outcomes. Mixed effects logistic regression was used to identify predictors of inhaler technique maintenance at 1 month. The variables found to be independently associated with inhaler technique maintenance using logistic regression (Χ 2 (3,n = 238) = 33.24, p < 0.000) were inhaler technique at Visit 1 (OR 7.1), device type (metered dose inhaler and dry powder inhalers) (OR 2.2) and self-reported adherent behavior in the prior 7 days (OR 1.3). This research is the first to unequivocally establish a predictive relationship between inhaler technique maintenance and actual patient adherence, reinforcing the notion that inhaler technique maintenance is more than just a physical skill. Inhaler technique maintenance has an underlying behavioral component, which future studies need to investigate. BEHAVIORAL ELEMENT TO CORRECT LONG-TERM INHALER TECHNIQUES: Patients who consciously make an effort to perfect asthma inhaler technique will maintain their skills long-term. Elizabeth Azzi at the University of Sydney, Australia, and co-workers further add evidence that there is a strong behavioral component to patients retaining correct inhaler technique over time. Poor inhaler technique can limit asthma control, affecting quality of life and increasing the chances of severe exacerbations. Azzi's team followed 238 patients to determine the key predictors of inhaler technique maintenance from factors including age, asthma knowledge and perceived future risks. Correct inhaler technique at initial assessment was the strongest predictor of long-term success, but this was strengthened further when patients reported good adherence to their own medication regimen. This suggests that maintaining correct inhaler technique is more than just a physical skill. Careful guidance towards this 'practice makes perfect' approach may improve patients' long-term technique maintenance.
49 CFR 236.576 - Roadway element.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.576 Roadway element. Roadway...
49 CFR 236.576 - Roadway element.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.576 Roadway element. Roadway...
Laptook, Abbot R; Kilbride, Howard; Shepherd, Edward; McDonald, Scott A; Shankaran, Seetha; Truog, William; Das, Abhik; Higgins, Rosemary D
2014-12-01
Therapeutic hypothermia improves the survival and neurodevelopmental outcome of infants with newborn encephalopathy of a hypoxic-ischemic origin. The NICHD Neonatal Research Network (NRN) Whole Body Cooling trial used the Cincinnati Sub-Zero Blanketrol II to achieve therapeutic hypothermia. The Blanketrol III is now available and provides additional cooling modes that may result in better temperature control. This report is a retrospective comparison of infants undergoing hypothermia using two different cooling modes of the Blanketrol device. Infants from the NRN trial were cooled with the Blanketrol II using the Automatic control mode (B2 cohort) and were compared with infants from two new NRN centers that adopted the NRN protocol and used the Blanketrol III in a gradient mode (B3 cohort). The primary outcome was the percent time the esophageal temperature stayed between 33°C and 34°C (target 33.5°C) during maintenance of hypothermia. Cohorts had similar birth weight, gestational age, and level of encephalopathy at the initiation of therapy. Baseline esophageal temperature differed between groups (36.6°C ± 1.0°C for B2 vs. 33.9°C ± 1.2°C for B3, p<0.0001) reflecting the practice of passive cooling during transport prior to initiation of active device cooling in the B3 cohort. This difference prevented comparison of temperatures during induction of hypothermia. During maintenance of hypothermia the mean and standard deviation of the percent time between 33°C and 34°C was similar for B2 compared to B3 cohorts (94.8% ± 0.1% vs. 95.8% ± 0.1%, respectively). Both the automatic and gradient control modes of the Blanketrol devices appear comparable in maintaining esophageal temperature within the target range during maintenance of therapeutic hypothermia.
Juan, Junerose; Hind, Jacqueline; Jones, Corinne; McCulloch, Timothy; Gangnon, Ron; Robbins, JoAnne
2013-01-01
Purpose Isometric progressive resistance oropharyngeal (I-PRO) therapy improves swallowing function; however, current devices utilize a single sensor that provides limited information or are prohibitively expensive. This single-subject study presents results of I-PRO therapy, detraining, and maintenance using the 5-sensor Madison Oral Strengthening Therapeutic (MOST) device combined with upper esophageal sphincter (UES) dilatation. Methods A 56-year-old female nurse who was 27 months post stroke and subsequent to traditional behavioral interventions and UES dilatations presented limited to gastrostomy tube intake only and expectorating all saliva. She completed 8 weeks of I-PRO therapy, 5 weeks of detraining, and 9 weeks of I-PRO maintenance (reduced frequency) followed by a third UES dilatation post intervention. Data included diet inventory, lingual pressures (MOST), lingual volume (magnetic resonance imaging), postswallow residue (videofl uoroscopy), UES and pharyngeal pressures (high-resolution manometry), and quality of life (QOL). Results Findings after 8 weeks of I-PRO therapy were progression to general oral diet, 15 lb weight gain, increased isometric pressures (Δ >16 kPa) with transference to swallowing pressures, increased lingual volume (8.3%), reduced pharyngeal wall residue (P = .03), increased pharyngeal pressures (Δ > 43 mm Hg) and increased UES opening (nadir) pressures (Δ > 9 mm Hg) with improved temporopressure coordination across the pharynx, and improved QOL. After detraining, decreased isometric pressures and reduced UES opening were noted. After I-PRO maintenance, isometric anterior lingual pressures returned to levels noted after the 8 weeks of intervention. Conclusion I-PRO therapy, facilitated by the MOST device combined with instrumental UES dilatation, improved swallow safety, increased oropharyngeal intake, and facilitated UES opening while enriching QOL. PMID:24091287
Kilbride, Howard; Shepherd, Edward; McDonald, Scott A.; Shankaran, Seetha; Truog, William; Das, Abhik; Higgins, Rosemary D.
2014-01-01
Therapeutic hypothermia improves the survival and neurodevelopmental outcome of infants with newborn encephalopathy of a hypoxic-ischemic origin. The NICHD Neonatal Research Network (NRN) Whole Body Cooling trial used the Cincinnati Sub-Zero Blanketrol II to achieve therapeutic hypothermia. The Blanketrol III is now available and provides additional cooling modes that may result in better temperature control. This report is a retrospective comparison of infants undergoing hypothermia using two different cooling modes of the Blanketrol device. Infants from the NRN trial were cooled with the Blanketrol II using the Automatic control mode (B2 cohort) and were compared with infants from two new NRN centers that adopted the NRN protocol and used the Blanketrol III in a gradient mode (B3 cohort). The primary outcome was the percent time the esophageal temperature stayed between 33°C and 34°C (target 33.5°C) during maintenance of hypothermia. Cohorts had similar birth weight, gestational age, and level of encephalopathy at the initiation of therapy. Baseline esophageal temperature differed between groups (36.6°C±1.0°C for B2 vs. 33.9°C±1.2°C for B3, p<0.0001) reflecting the practice of passive cooling during transport prior to initiation of active device cooling in the B3 cohort. This difference prevented comparison of temperatures during induction of hypothermia. During maintenance of hypothermia the mean and standard deviation of the percent time between 33°C and 34°C was similar for B2 compared to B3 cohorts (94.8%±0.1% vs. 95.8%±0.1%, respectively). Both the automatic and gradient control modes of the Blanketrol devices appear comparable in maintaining esophageal temperature within the target range during maintenance of therapeutic hypothermia. PMID:25285767
49 CFR 236.556 - Adjustment of relay.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.556 Adjustment of relay...
49 CFR 236.527 - Roadway element insulation resistance.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.527 Roadway...
49 CFR 236.527 - Roadway element insulation resistance.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.527 Roadway...
49 CFR 236.556 - Adjustment of relay.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.556 Adjustment of relay...
A comprehensive review of arsenic levels in the semiconductor manufacturing industry.
Park, Donguk; Yang, Haengsun; Jeong, Jeeyeon; Ha, Kwonchul; Choi, Sangjun; Kim, Chinyon; Yoon, Chungsik; Park, Dooyong; Paek, Domyung
2010-11-01
This paper presents a summary of arsenic level statistics from air and wipe samples taken from studies conducted in fabrication operations. The main objectives of this study were not only to describe arsenic measurement data but also, through a literature review, to categorize fabrication workers in accordance with observed arsenic levels. All airborne arsenic measurements reported were included in the summary statistics for analysis of the measurement data. The arithmetic mean was estimated assuming a lognormal distribution from the geometric mean and the geometric standard deviation or the range. In addition, weighted arithmetic means (WAMs) were calculated based on the number of measurements reported for each mean. Analysis of variance (ANOVA) was employed to compare arsenic levels classified according to several categories such as the year, sampling type, location sampled, operation type, and cleaning technique. Nine papers were found reporting airborne arsenic measurement data from maintenance workers or maintenance areas in semiconductor chip-making plants. A total of 40 statistical summaries from seven articles were identified that represented a total of 423 airborne arsenic measurements. Arsenic exposure levels taken during normal operating activities in implantation operations (WAM = 1.6 μg m⁻³, no. of samples = 77, no. of statistical summaries = 2) were found to be lower than exposure levels of engineers who were involved in maintenance works (7.7 μg m⁻³, no. of samples = 181, no. of statistical summaries = 19). The highest level (WAM = 218.6 μg m⁻³) was associated with various maintenance works performed inside an ion implantation chamber. ANOVA revealed no significant differences in the WAM arsenic levels among the categorizations based on operation and sampling characteristics. Arsenic levels (56.4 μg m⁻³) recorded during maintenance works performed in dry conditions were found to be much higher than those from maintenance works in wet conditions (0.6 μg m⁻³). Arsenic levels from wipe samples in process areas after maintenance activities ranged from non-detectable to 146 μg cm⁻², indicating the potential for dispersion into the air and hence inhalation. We conclude that workers who are regularly or occasionally involved in maintenance work have higher potential for occupational exposure than other employees who are in charge of routine production work. In addition, fabrication workers can be classified into two groups based on the reviewed arsenic exposure levels: operators with potential for low levels of exposure and maintenance engineers with high levels of exposure. These classifications could be used as a basis for a qualitative ordinal ranking of exposure in an epidemiological study.
Design of a leak detection device for marine airtight container
NASA Astrophysics Data System (ADS)
Li, Yuan; Zhu, Faxin; Lu, Jinshu; Li, Yule; Wu, Wenfeng; Zhang, Jianwei; Qin, Beichen
2018-04-01
The ship airtight container as the research object, according to the tightness of the traditional detection methods of sealed container from the shortcomings of the design of modern ship sealed container leak detection device based on the requirements of the use of AutoCAD to design a ship leakage detection device using airtight container, and introduces its working principle and main components. Finally, from the aspects of technology, structure, operation and economy, the feasibility analysis of the leak detection device for marine airtight container is designed, and it is concluded that the device has the advantages of simple operation, short detection time, easy maintenance and cost control, and has high feasibility.
Variability of hydrologic regimes and morphology in constructed open-ditch channels
Strock, J.S.; Magner, J.A.; Richardson, W.B.; Sadowsky, M.J.; Sands, G.R.; Venterea, R.T.; ,
2004-01-01
Open-ditch ecosystems are potential transporters of considerable loads of nutrients, sediment, pathogens and pesticides from direct inflow from agricultural land to small streams and larger rivers. Our objective was to compare hydrology and channel morphology between two experimental open-ditch channels. An open-ditch research facility incorporating a paired design was constructed during 2002 near Lamberton, MN. A200-m reach of existing drainage channel was converted into a system of four parallel channels. The facility was equipped with water level control devices and instrumentation for flow monitoring and water sample collection on upstream and downstream ends of the system. Hydrographs from simulated flow during year one indicated that paired open-ditch channels responded similarly to changes in inflow. Variability in hydrologic response between open-ditches was attributed to differences in open-ditch channel bottom elevation and vegetation density. No chemical, biological, or atmospheric measurements were made during 2003. Potential future benefits of this research include improved biological diversity and integrity of open-ditch ecosystems, reduce flood peaks and increased flow during critical low-flow periods, improved and more efficient nitrogen retention within the open-ditch ecosystem, and decreased maintenance cost associated with reduced frequency of open-ditch maintenance.
ERIC Educational Resources Information Center
Mancil, G. Richmond; Lorah, Elizabeth R.; Whitby, Peggy Schaefer
2016-01-01
The purpose of the study was to evaluate the use of the iPod Touch™ as a Speech Generated Device (SGD) for Functional Communication Training (FCT). The evaluation of the effects on problem behavior, the effects on generalization and maintenance of the acquired communication repertoire, and the social initiations of peers between the new SGD (iPod…
GOES data-collection system instrumentation, installation, and maintenance manual
Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.
1986-01-01
The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)
NASA Technical Reports Server (NTRS)
1987-01-01
United Scanning Technologies, Inc.'s Infrared thermography is a relatively new noncontact, nondestructive inspection and testing tool which makes temperatures visible to the human eye. Infrared scanning devices produce images that show, by color or black and white shading differences, heat losses through damaged or inadequately insulated walls or roofs. The MISS Aeroscan services are designed to take the guesswork out of industrial roof maintenance and provide companies big savings by identifying the location of moisture damage from roof leaks, effectively targeting maintenance attention.
Graphene Oxide/ Ruthenium Oxide Composites for Supercapacitors Electrodes
NASA Astrophysics Data System (ADS)
Amir, Fatima
Supercapacitors are electrical energy storage devices with high power density, high rate capability, low maintenance cost, and long life cycle. They complement or replace batteries in harvesting applications when high power delivery is needed. An important improvement in performance of supercapacitors has been achieved through recent advances in the development of new nanostructured materials. Here we will discuss the fabrication of graphene oxide/ ruthenium oxide supercacitors electrodes including electrophoretic deposition. The morphology and structure of the fabricated electrodes were investigated and will be discussed. The electrochemical properties were determined using cyclic voltammetry and galvanostatic charge/discharge techniques and the experiments that demonstrate the excellent capacitive properties of the obtained supercapacitors will also be discussed. The fabrication and characterization of the samples were performed at the Center of Functional Nanomaterials at Brookhaven National Lab. The developed approaches in our study represent an exciting direction for designing the next generation of energy storage devices. This work was supported in part by the U.S. Department of Energy through the Visiting Faculty Program and the research used resources of the Center for Functional Nanomaterials at Brookhaven National Laboratory.
Demonstration of the Use of Remote Temperature Monitoring Devices in Vaccine Refrigerators in Haiti.
Cavallaro, Kathleen F; Francois, Jeannot; Jacques, Roody; Mentor, Derline; Yalcouye, Idrissa; Wilkins, Karen; Mueller, Nathan; Turner, Rebecca; Wallace, Aaron; Tohme, Rania A
After the 2010 earthquake, Haiti committed to introducing 4 new antigens into its routine immunization schedule, which required improving its cold chain (ie, temperature-controlled supply chain) and increasing vaccine storage capacity by installing new refrigerators. We tested the feasibility of using remote temperature monitoring devices (RTMDs) in Haiti in a sample of vaccine refrigerators fueled by solar panels, propane gas, or electricity. We analyzed data from 16 RTMDs monitoring 24 refrigerators in 15 sites from March through August 2014. Although 5 of the 16 RTMDs exhibited intermittent data gaps, we identified typical temperature patterns consistent with refrigerator door opening and closing, propane depletion, thermostat insufficiency, and overstocking. Actual start-up, annual maintenance, and annual electricity costs for using RTMDs were $686, $179, and $9 per refrigerator, respectively. In Haiti, RTMD use was feasible. RTMDs could be prioritized for use with existing refrigerators with high volumes of vaccines and new refrigerators to certify their functionality before use. Vaccine vial monitors could provide additional useful information about cumulative heat exposure and possible vaccine denaturation.
Advanced biosensors for monitoring astronauts' health during long-duration space missions.
Roda, Aldo; Mirasoli, Mara; Guardigli, Massimo; Zangheri, Martina; Caliceti, Cristiana; Calabria, Donato; Simoni, Patrizia
2018-07-15
Long-duration space missions pose important health concerns for astronauts, especially regarding the adverse effects of microgravity and exposure to high-energy cosmic rays. The long-term maintenance of crew health and performance mainly relies on prevention, early diagnoses, condition management, and medical interventions in situ. In-flight biosensor diagnostic devices and medical procedures must use few resources and operate in a microgravity environment, which complicates the collection and management of biological samples. Moreover, the biosensors must be certified for in-flight operation according to strict design and safety regulations. Herein, we report on the state of the art and recent advances in biosensing diagnostic instrumentation for monitoring astronauts' health during long-duration space missions, including portable and wearable biosensors. We discuss perspectives on new-format biosensors in autonomous space clinics. We also describe our own work in developing biosensing devices for non-invasively diagnosing space-related diseases, and how they are used in long-duration missions. Finally, we discuss the benefits of space exploration for Earth-based medicine. Copyright © 2018 Elsevier B.V. All rights reserved.
Analyzing machine noise for real time maintenance
NASA Astrophysics Data System (ADS)
Yamato, Yoji; Fukumoto, Yoshifumi; Kumazaki, Hiroki
2017-02-01
Recently, IoT technologies have been progressed and applications of maintenance area are expected. However, IoT maintenance applications are not spread in Japan yet because of one-off solution of sensing and analyzing for each case, high cost to collect sensing data and insufficient maintenance automation. This paper proposes a maintenance platform which analyzes sound data in edges, analyzes only anomaly data in cloud and orders maintenance automatically to resolve existing technology problems. We also implement a sample application and compare related work.
40 CFR 63.2998 - What records must I maintain?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Records of maintenance and inspections performed on the control devices. (e) If an operating parameter... which corrective actions were initiated and completed; (4) A brief description of the corrective actions...
49 CFR 236.555 - Repaired or rewound receiver coil.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.555 Repaired...
49 CFR 236.558-236.559 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives §§ 236.558-236.559 [Reserved] ...
49 CFR 236.529 - Roadway element inductor; height and distance from rail.
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...
49 CFR 236.529 - Roadway element inductor; height and distance from rail.
Code of Federal Regulations, 2010 CFR
2010-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...
49 CFR 236.558-236.559 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives §§ 236.558-236.559 [Reserved] ...
49 CFR 236.555 - Repaired or rewound receiver coil.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Locomotives § 236.555 Repaired...
49 CFR 236.202 - Signal governing movements over hand-operated switch.
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.202 Signal governing movements over hand...
ERIC Educational Resources Information Center
LYNN, FRANK
THE APPENDIXES FOR "AN INVESTIGATION OF THE TRAINING AND SKILL REQUIREMENTS OF INDUSTRIAL MACHINERY MAINTENANCE WORKERS, FINAL REPORT, VOLUME I" (VT 004 006) INCLUDE (1) TWO LETTERS FROM PLANT ENGINEERS STRESSING THE IMPORTANCE OF TRAINING MACHINERY MAINTENANCE WORKERS, (2) A DESCRIPTION OF THE MAINTENANCE TRAINING SURVEY, A SAMPLE QUESTIONNAIRE,…
Reed, Terrie L; Kaufman-Rivi, Diana
2010-01-01
The broad array of medical devices and the potential for device failures, malfunctions, and other adverse events associated with each device creates a challenge for public health device surveillance programs. Coding reported events by type of device problem provides one method for identifying a potential signal of a larger device issue. The Food and Drug Administration's (FDA) Center for Devices and Radiological Health (CDRH) Event Problem Codes that are used to report adverse events previously lacked a structured set of controls for code development and maintenance. Over time this led to inconsistent, ambiguous, and duplicative concepts being added to the code set on an ad-hoc basis. Recognizing the limitation of its coding system the FDA set out to update the system to improve its usefulness within FDA and as a basis of a global standard to identify important patient and device outcomes throughout the medical community. In 2004, FDA and the National Cancer Institute (NCI) signed a Memorandum of Understanding (MOU) whereby NCI agreed to provide terminology development and maintenance services to all FDA Centers. Under this MOU, CDRH's Office of Surveillance and Biometrics (OSB) convened a cross-Center workgroup and collaborated with staff at NCI Enterprise Vocabulary Service (EVS) to streamline the Patient and Device Problem Codes and integrate them into the NCI Thesaurus and Meta-Thesaurus. This initiative included many enhancements to the Event Problem Codes aimed at improving code selection as well as improving adverse event report analysis. LIMITATIONS & RECOMMENDATIONS: Staff resources, database concerns, and limited collaboration with external groups in the initial phases of the project are discussed. Adverse events associated with medical device use can be better understood when they are reported using a consistent and well-defined code set. This FDA initiative was an attempt to improve the structure and add control mechanisms to an existing code set, improve analysis tools that will better identify device safety trends, and improve the ability to prevent or mitigate effects of adverse events associated with medical device use.
Sorption of atmospheric gases by bulk lithium metal
Hart, C. A.; Skinner, C. H.; Capece, A. M.; ...
2016-01-01
Lithium conditioning of plasma facing components has enhanced the performance of several fusion devices. Elemental lithium will react with air during maintenance activities and with residual gases (H 2O, CO, CO 2) in the vacuum vessel during operations. We have used a mass balance (microgram sensitivity) to measure the mass gain of lithium samples during exposure of a ~1 cm 2 surface to ambient and dry synthetic air. For ambient air, we found an initial mass gain of several mg/h declining to less than 1 mg/h after an hour and decreasing by an order of magnitude after 24 h. Amore » 9 mg sample achieved a final mass gain corresponding to complete conversion to Li 2CO 3 after 5 days. Exposure to dry air resulted in a 30 times lower initial rate of mass gain. The results have implications for the chemical state of lithium plasma facing surfaces and for safe handling of lithium coated components.« less
49 CFR 236.532 - Strap iron inductor; use restricted.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.532 Strap iron...
49 CFR 236.204 - Track signaled for movements in both directions, requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...
49 CFR 236.204 - Track signaled for movements in both directions, requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...
49 CFR 236.532 - Strap iron inductor; use restricted.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.532 Strap iron...
49 CFR 236.577 - Test, acknowledgement, and cut-in circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.577 Test...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
2013-10-03
ISS037-E-006562 (3 Oct. 2013) --- NASA astronaut Michael Hopkins, Expedition 37 flight engineer, performs routine in-flight maintenance on the advanced Resistive Exercise Device (aRED) in the Tranquility node of the International Space Station.
2013-10-03
ISS037-E-006563 (3 Oct. 2013) --- NASA astronaut Michael Hopkins, Expedition 37 flight engineer, performs routine in-flight maintenance on the advanced Resistive Exercise Device (aRED) in the Tranquility node of the International Space Station.
A framework of medical equipment management system for in-house clinical engineering department.
Chien, Chia-Hung; Huang, Yi-You; Chong, Fok-Ching
2010-01-01
Medical equipment management is an important issue for safety and cost in modern hospital operation. In addition, the use of an efficient information system effectively promotes the managing performance. In this study, we designed a framework of medical equipment management system used for in-house clinical engineering department. The system was web-based, and it integrated clinical engineering and hospital information system components. Through related information application, it efficiently improved the operation management of medical devices immediately and continuously. This system has run in the National Taiwan University Hospital. The results showed only few examples in the error analysis of medical equipment by the maintenance sub-system. The information can be used to improve work quality, to reduce the maintenance cost, and to promote the safety of medical device used in patients and clinical staffs.
Cell-phone based assistance for waterworks/sewage plant maintenance.
Kawada, T; Nakamichi, K; Hisano, N; Kitamura, M; Miyahara, K
2006-01-01
Cell-phones are now incorporating the functions necessary for them to be used as mobile IT devices. In this paper, we present our results of the evaluation of cell-phones as the mobile IT device to assist workers in industrial plants. We use waterworks and sewage plants as examples. By employing techniques to squeeze the SCADA screen on CRT into a small cell-phone LCD, we have made it easier for a plant's field workers to access the information needed for effective maintenance, regardless of location. An idea to link SCADA information and the plant facility information on the cell-phone is also presented. Should an accident or emergency situation arise, these cell-phone-based IT systems can efficiently deliver the latest plant information, thus the worker out in the field can respond to and resolve the emergency.
Guiffant, Gérard; Durussel, Jean Jacques; Flaud, Patrice; Vigier, Jean Pierre; Merckx, Jacques
2012-01-01
The use of totally implantable venous access devices developed as a medical device allowing mid- and long-term, frequent, repeated, or continuous injection of therapeutic products, by vascular, cavitary, or perineural access. The effective flushing of these devices is a central element to assure long-lasting use. Our experimental work demonstrates that directing the Huber point needle opening in the diametrically opposite direction of the implantable port exit channel increases the flushing efficiency. These results are consolidated by numerical computations, which support recommendations not only for their maintenance, but also for their use.
Guiffant, Gérard; Durussel, Jean Jacques; Flaud, Patrice; Vigier, Jean Pierre; Merckx, Jacques
2012-01-01
The use of totally implantable venous access devices developed as a medical device allowing mid- and long-term, frequent, repeated, or continuous injection of therapeutic products, by vascular, cavitary, or perineural access. The effective flushing of these devices is a central element to assure long-lasting use. Our experimental work demonstrates that directing the Huber point needle opening in the diametrically opposite direction of the implantable port exit channel increases the flushing efficiency. These results are consolidated by numerical computations, which support recommendations not only for their maintenance, but also for their use. PMID:23166455
Evaluating alternative service contracts for medical equipment.
De Vivo, L; Derrico, P; Tomaiuolo, D; Capussotto, C; Reali, A
2004-01-01
Managing medical equipments is a formidable task that has to be pursued maximizing the benefits within a highly regulated and cost-constrained environment. Clinical engineers are uniquely equipped to determine which policies are the most efficacious and cost effective for a health care institution to ensure that medical devices meet appropriate standards of safety, quality and performance. Part of this support is a strategy for preventive and corrective maintenance. This paper describes an alternative scheme of OEM (Original Equipment Manufacturer) service contract for medical equipment that combines manufacturers' technical support and in-house maintenance. An efficient and efficacious organization can reduce the high cost of medical equipment maintenance while raising reliability and quality. Methodology and results are discussed.
A sampling device with a capped body and detachable handle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jezek, Gerd-Rainer
1997-12-01
The present invention relates to a device for sampling radioactive waste and more particularly to a device for sampling radioactive waste which prevents contamination of a sampled material and the environment surrounding the sampled material. During vitrification of nuclear wastes, it is necessary to remove contamination from the surfaces of canisters filled with radioactive glass. After removal of contamination, a sampling device is used to test the surface of the canister. The one piece sampling device currently in use creates a potential for spreading contamination during vitrification operations. During operations, the one piece sampling device is transferred into and outmore » of the vitrification cell through a transfer drawer. Inside the cell, a remote control device handles the sampling device to wipe the surface of the canister. A one piece sampling device can be contaminated by the remote control device prior to use. Further, the sample device can also contaminate the transfer drawer producing false readings for radioactive material. The present invention overcomes this problem by enclosing the sampling pad in a cap. The removable handle is reused which reduces the amount of waste material.« less
Bowler, Michael G; Bowler, David R; Bowler, Matthew W
2017-04-01
The humidity surrounding a sample is an important variable in scientific experiments. Biological samples in particular require not just a humid atmosphere but often a relative humidity (RH) that is in equilibrium with a stabilizing solution required to maintain the sample in the same state during measurements. The controlled dehydration of macromolecular crystals can lead to significant increases in crystal order, leading to higher diffraction quality. Devices that can accurately control the humidity surrounding crystals while monitoring diffraction have led to this technique being increasingly adopted, as the experiments become easier and more reproducible. Matching the RH to the mother liquor is the first step in allowing the stable mounting of a crystal. In previous work [Wheeler, Russi, Bowler & Bowler (2012). Acta Cryst. F 68 , 111-114], the equilibrium RHs were measured for a range of concentrations of the most commonly used precipitants in macromolecular crystallography and it was shown how these related to Raoult's law for the equilibrium vapour pressure of water above a solution. However, a discrepancy between the measured values and those predicted by theory could not be explained. Here, a more precise humidity control device has been used to determine equilibrium RH points. The new results are in agreement with Raoult's law. A simple argument in statistical mechanics is also presented, demonstrating that the equilibrium vapour pressure of a solvent is proportional to its mole fraction in an ideal solution: Raoult's law. The same argument can be extended to the case where the solvent and solute molecules are of different sizes, as is the case with polymers. The results provide a framework for the correct maintenance of the RH surrounding a sample.
NASA Astrophysics Data System (ADS)
Chakravarty, T.; Chowdhury, A.; Ghose, A.; Bhaumik, C.; Balamuralidhar, P.
2014-03-01
Telematics form an important technology enabler for intelligent transportation systems. By deploying on-board diagnostic devices, the signatures of vehicle vibration along with its location and time are recorded. Detailed analyses of the collected signatures offer deep insights into the state of the objects under study. Towards that objective, we carried out experiments by deploying telematics device in one of the office bus that ferries employees to office and back. Data is being collected from 3-axis accelerometer, GPS, speed and the time for all the journeys. In this paper, we present initial results of the above exercise by applying statistical methods to derive information through systematic analysis of the data collected over four months. It is demonstrated that the higher order derivative of the measured Z axis acceleration samples display the properties Weibull distribution when the time axis is replaced by the amplitude of such processed acceleration data. Such an observation offers us a method to predict future behaviour where deviations from prediction are classified as context-based aberrations or progressive degradation of the system. In addition we capture the relationship between speed of the vehicle and median of the jerk energy samples using regression analysis. Such results offer an opportunity to develop a robust method to model road-vehicle interaction thereby enabling us to predict such like driving behaviour and condition based maintenance etc.
NASA Technical Reports Server (NTRS)
Card, Michael E.
1991-01-01
The areas of space exploration in which robotic devices will play a part are identified, and progress to date in the space agency plans to acquire this capability is briefly reviewed. Roles and functions on orbit for robotic devices include well known activities, such as inspection and maintenance, assembly, docking, berthing, deployment, retrieval, materials handling, orbital replacement unit exchange, and repairs. Missions that could benefit from a robotic capability are discussed.
Home-use TriPollar RF device for facial skin tightening: Clinical study results.
Beilin, Ghislaine
2011-04-01
Professional, non-invasive, anti-aging treatments based on radio-frequency (RF) technologies are popular for skin tightening and improvement of wrinkles. A new home-use RF device for facial treatments has recently been developed based on TriPollar™ technology. To evaluate the STOP™ home-use device for facial skin tightening using objective and subjective methods. Twenty-three female subjects used the STOP at home for a period of 6 weeks followed by a maintenance period of 6 weeks. Facial skin characteristics were objectively evaluated at baseline and at the end of the treatment and maintenance periods using a three-dimensional imaging system. Additionally, facial wrinkles were classified and subjects scored their satisfaction and sensations. Following STOP treatment, a statistically significant reduction of perioral and periorbital wrinkles was achieved in 90% and 95% of the patients, respectively, with an average periorbital wrinkle reduction of 41%. This objective result correlated well with the periorbital wrinkle classification result of 40%. All patients were satisfied to extremely satisfied with the treatments and all reported moderate to excellent visible results. The clinical study demonstrated the safety and efficacy of the STOP home-use device for facial skin tightening. Treatment can maintain a tighter and suppler skin with improvement of fine lines and wrinkles.
Guideline Implementation: Energy-Generating Devices, Part 1-Electrosurgery.
Eder, Sheryl P
2017-03-01
Energy-generating devices are standard equipment in the surgical suite, with electrosurgical units being the most common type of electrical device used in the OR. Prevention of injuries to patients and personnel related to the use of energy-generating devices is a key component of the perioperative nurse's role. The AORN "Guideline for safe use of energy-generating devices" provides guidance on the use and maintenance of devices that deliver energy in the forms of radiofrequency waves, ultrasound waves, or lasers. This article focuses on key points of the guideline, which address precautions specific to electrosurgical units, patients with implanted electronic devices, and minimally invasive surgery, and documentation of the use of energy-generating devices. Perioperative RNs should review the complete guideline for additional information and for guidance when writing and updating policies and procedures. Copyright © 2017 AORN, Inc. Published by Elsevier Inc. All rights reserved.
A Grounded Theory Study of Aircraft Maintenance Technician Decision-Making
NASA Astrophysics Data System (ADS)
Norcross, Robert
Aircraft maintenance technician decision-making and actions have resulted in aircraft system errors causing aircraft incidents and accidents. Aircraft accident investigators and researchers examined the factors that influence aircraft maintenance technician errors and categorized the types of errors in an attempt to prevent similar occurrences. New aircraft technology introduced to improve aviation safety and efficiency incur failures that have no information contained in the aircraft maintenance manuals. According to the Federal Aviation Administration, aircraft maintenance technicians must use only approved aircraft maintenance documents to repair, modify, and service aircraft. This qualitative research used a grounded theory approach to explore the decision-making processes and actions taken by aircraft maintenance technicians when confronted with an aircraft problem not contained in the aircraft maintenance manuals. The target population for the research was Federal Aviation Administration licensed aircraft and power plant mechanics from across the United States. Nonprobability purposeful sampling was used to obtain aircraft maintenance technicians with the experience sought in the study problem. The sample population recruitment yielded 19 participants for eight focus group sessions to obtain opinions, perceptions, and experiences related to the study problem. All data collected was entered into the Atlas ti qualitative analysis software. The emergence of Aircraft Maintenance Technician decision-making themes regarding Aircraft Maintenance Manual content, Aircraft Maintenance Technician experience, and legal implications of not following Aircraft Maintenance Manuals surfaced. Conclusions from this study suggest Aircraft Maintenance Technician decision-making were influenced by experience, gaps in the Aircraft Maintenance Manuals, reliance on others, realizing the impact of decisions concerning aircraft airworthiness, management pressures, and legal concerns related to decision-making. Recommendations included an in-depth systematic review of the Aircraft Maintenance Manuals, development of a Federal Aviation Administration approved standardized Aircraft Maintenance Technician decision-making flow diagram, and implementation of risk based decision-making training. The benefit of this study is to save the airline industry revenue by preventing poor decision-making practices that result in inefficient maintenance actions and aircraft incidents and accidents.
30 CFR 28.3 - Installation, use, and maintenance of approved fuses.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES General Provisions § 28.3 Installation, use, and... standards prescribed for short-circuit protective devices for trailing cables in Parts 75 and 77, Subchapter...
Guidelines for the operation of variable message signs on state highways
DOT National Transportation Integrated Search
2004-06-01
A variable message sign (VMS) is a traffic control device whose message can be changed manually, electrically, mechanically, or electromechanically to provide motorists with information about traffic congestion, traffic crashes, maintenance operation...
30 CFR 75.900-3 - Testing, examination, and maintenance of circuit breakers; procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... current circuits serving three-phase alternating current equipment and their auxiliary devices shall be... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.900-3 Testing, examination, and...
30 CFR 75.900-3 - Testing, examination, and maintenance of circuit breakers; procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... current circuits serving three-phase alternating current equipment and their auxiliary devices shall be... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.900-3 Testing, examination, and...
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... galvanic corrosion. (c) For each integrating regeneration stream flow monitoring device associated with a... recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
Work zone intrusion alarm effectiveness.
DOT National Transportation Integrated Search
2010-09-01
16. Abstract : The New Jersey Department of Transportation (NJDOT) commissioned a study to evaluate how : effective a work zone safety device known as the SonoBlaster! Work Zone Intrusion Alarm would be : in protecting maintenance workers fro...
23 CFR 630.1110 - Maintenance of temporary traffic control devices.
Code of Federal Regulations, 2013 CFR
2013-04-01
... of Transportation “Quality Standards for Work Zone Traffic Control Devices” is available online at... Unacceptable” is available online at http://www.dot.state.mn.us/trafficeng/otepubl/fieldmanual2007/FM-2007...
23 CFR 630.1110 - Maintenance of temporary traffic control devices.
Code of Federal Regulations, 2012 CFR
2012-04-01
... of Transportation “Quality Standards for Work Zone Traffic Control Devices” is available online at... Unacceptable” is available online at http://www.dot.state.mn.us/trafficeng/otepubl/fieldmanual2007/FM-2007...
23 CFR 630.1110 - Maintenance of temporary traffic control devices.
Code of Federal Regulations, 2011 CFR
2011-04-01
... of Transportation “Quality Standards for Work Zone Traffic Control Devices” is available online at... Unacceptable” is available online at http://www.dot.state.mn.us/trafficeng/otepubl/fieldmanual2007/FM-2007...
23 CFR 630.1110 - Maintenance of temporary traffic control devices.
Code of Federal Regulations, 2014 CFR
2014-04-01
... of Transportation “Quality Standards for Work Zone Traffic Control Devices” is available online at... Unacceptable” is available online at http://www.dot.state.mn.us/trafficeng/otepubl/fieldmanual2007/FM-2007...
2009-06-23
ISS020-E-013993 (23 June 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, performs in-flight maintenance on the advanced Resistive Exercise Device (aRED) in the Unity node of the International Space Station.
49 CFR 236.780 - Plunger, facing point lock.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.780 Plunger, facing point lock. That part of a facing point lock which secures the lock rod to the...
49 CFR 236.780 - Plunger, facing point lock.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.780 Plunger, facing point lock. That part of a facing point lock which secures the lock rod to the...
49 CFR 236.780 - Plunger, facing point lock.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.780 Plunger, facing point lock. That part of a facing point lock which secures the lock rod to the...
49 CFR 236.780 - Plunger, facing point lock.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.780 Plunger, facing point lock. That part of a facing point lock which secures the lock rod to the...
49 CFR 236.780 - Plunger, facing point lock.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.780 Plunger, facing point lock. That part of a facing point lock which secures the lock rod to the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... instruments. 34.73 Section 34.73 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.73...
Code of Federal Regulations, 2014 CFR
2014-01-01
... instruments. 34.73 Section 34.73 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.73...
Code of Federal Regulations, 2012 CFR
2012-01-01
... instruments. 34.73 Section 34.73 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.73...
Code of Federal Regulations, 2013 CFR
2013-01-01
... instruments. 34.73 Section 34.73 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.73...
Khokhar, Bushra; Jones, Jessica; Ronksley, Paul E; Armstrong, Marni J; Caird, Jeff; Rabi, Doreen
2014-01-01
Mobile electronic devices, such as mobile phones and PDAs, have emerged as potentially useful tools in the facilitation and maintenance of weight loss. While RCTs have demonstrated a positive impact of mobile interventions, the extent to which mobile electronic devices are more effective than usual care methods is still being debated. Electronic databases were systematically searched for RCTs evaluating the effectiveness of mobile electronic device interventions among overweight and obese adults. Weighted mean difference for change in body weight was the primary outcome. The search strategy yielded 559 citations and of the 108 potentially relevant studies, six met the criteria. A total of 632 participants were included in the six studies reporting a mean change in body weight. Using a random-effects model, the WMD for the effect of using mobile electronic devices on reduction in body weight was -1.09 kg (95% CI -2.12, -0.05). When stratified by the type of mobile electronic device used, it suggests that interventions using mobile phones were effective at achieving weight loss, WMD = -1.78 kg (95% CI -2.92, -0.63). This systematic review and meta-analysis suggests that mobile electronic devices have the potential to facilitate weight loss in overweight and obese populations, but further work is needed to understand if these interventions have sustained benefit and how we can make these mHealth tools most effective on a large scale. As the field of healthcare increasingly utilizes novel mobile technologies, the focus must not be on any one specific device but on the best possible use of these tools to measure and understand behavior. As mobile electronic devices continue to increase in popularity and the associated technology continues to advance, the potential for the use of mobile devices in global healthcare is enormous. More RCTs with larger sample sizes need to be conducted to look at the cost-effectiveness, technical and financial feasibility of adapting such mHealth interventions in a real clinical setting.
NASA Astrophysics Data System (ADS)
Hermoso, J. L. Navarro; Espinosa-Rueda, Guillermo; Martinez, Noelia; Heras, Carlos; Osta, Marta
2016-05-01
The performance of parabolic trough (PT) receiver tubes (RT) has a direct impact on Solar Thermal Energy (STE) plant production. As a result, one major need of operation and maintenance (O&M) in STE plants is to monitor the state of the receiver tube as a key element in the solar field. However the lack of specific devices so far has limited the proper evaluation of operating receiver tubés thermal performance. As a consequence non-accurate approximations have been accepted until now using infrared thermal images of the glass outer tube. In order to fulfill this need, Abengoa has developed a unique portable device for evaluating the thermal performance and vacuum state of parabolic trough receiver tubes placed in the field. The novel device described in this paper, simultaneously provides the temperature of both the inner steel tube and the outer glass tube enabling a check on manufacturers specifications. The on-field evaluation of any receiver tube at any operating temperature has become possible thanks to this new measuring device. The features and usability of this new measurement system as a workable portable device in operating solar fields provide a very useful tool for all companies in the sector contributing to technology progress. The originality of the device, patent pending P201431969, is not limited to the CSP sector, also having scientific significance in the general measuring instruments field. This paper presents the work carried out to develop and validate the device, also detailing its functioning properties and including the excellent results obtained in the laboratory to determine its accuracy and standard deviation. This information was validated with data collected by O&M teams using this instrument in a commercial CSP plant. The relevance of the device has been evidenced by evaluating a wide sample of RT and the results are discussed in this paper. Finally, all the on field collected data is used to demonstrate the high impact that using this unique portable device will have on a parabolic trough solar power plant.
Emotion work and boundary maintenance in hospital-based midwifery.
Hunter, Billie
2005-09-01
To identify and explore the emotion work of hospital-based midwives. An ethnographic approach using focus groups, observations and interviews. South Wales, UK. Phase one of the study: self-selected convenience sample of 27 student midwives in first and final years of 3-year (direct entry) and 18-month (post-nursing) programmes. Phase two: opportunistic sample of seven qualified hospital-based midwives. Phase three: Purposive sample of 10 hospital-based midwives working within one National Health Service Trust. Sample representative of a range of clinical locations, length of clinical experience and clinical grades. The emotion work of midwives was strongly influenced by the context of practice. For hospital-based midwives, relationships with midwifery colleagues were of key importance, providing the main source of feedback on individual practice. Negotiating these relationships was a major source of emotion work. Although collegial relationships could provide support and affirmation, they were also a frequent source of conflict, particularly between junior and senior midwives. This discord was underpinned by conflicting ideologies of midwifery practice. The theoretical framework of boundary maintenance was used to interpret the findings. Senior and junior midwives frequently held contradictory models of practice, resulting in competing claims for occupational jurisdiction. Midwives made use of a variety of devices in order to establish and maintain intra-occupational boundaries. Senior midwives attempted to maintain their position through unwritten rules and sanctions, supported by their claim to greater clinical expertise and experience. Junior midwives rarely challenged this authority; their responses were often subversive and designed to create an appearance of compliance. These findings contribute to our understanding of inter-collegial conflict in UK midwifery, providing insights into workplace harassment and low staff morale, which are likely to exacerbate workforce attrition. The underpinning ideological dissonance experienced by midwives must be acknowledged and tackled for these issues to be effectively addressed.
49 CFR 236.341 - Latch shoes, rocker links, and quadrants.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Interlocking... downward force not exceeding a man's weight is exerted on the rocker while the lever is in the mid-stroke...
33 CFR 157.12c - Construction, maintenance, security, calibration, and training.
Code of Federal Regulations, 2013 CFR
2013-07-01
... seals or activation of another device, which indicates an entry to the equipment. (b) The seals must be... reading, and the ability to re-zero the instrument. (f) Ship staff training must include familiarization...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
... operation and maintenance of this equipment. These standards rely on the capture and reduction of methane, carbon dioxide, and non-methane organic gas compound emissions by combustion devices (boilers, internal...
Code of Federal Regulations, 2010 CFR
2010-10-01
... and maintenance, traffic control devices, identification and surveillance of accident locations, and... Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT.... (10) Section 20134(a), with respect to the laws administered by the National Highway Traffic Safety...
Advanced Ground Systems Maintenance Intelligent Devices/Smart Sensors Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M. (Compiler)
2015-01-01
This project provides development and qualification of Smart Sensors capable of self-diagnosis and assessment of their capability/readiness to support operations. These sensors will provide pressure and temperature measurements for use in ground systems.
47 CFR 18.213 - Information to the user.
Code of Federal Regulations, 2010 CFR
2010-10-01
... for any type of ISM equipment: (a) The interference potential of the device or system (b) Maintenance... permitted provided all the points of the statement are addressed and may be presented in any legible font or...
NASA safety standard for lifting devices and equipment
NASA Astrophysics Data System (ADS)
1990-09-01
NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.
NASA safety standard for lifting devices and equipment
NASA Technical Reports Server (NTRS)
1990-01-01
NASA's minimum safety requirements are established for the design, testing, inspection, maintenance, certification, and use of overhead and gantry cranes (including top running monorail, underhung, and jib cranes), mobile cranes, derrick hoists, and special hoist supported personnel lifting devices (these do not include elevators, ground supported personnel lifts, or powered platforms). Minimum requirements are also addressed for the testing, inspection, and use of Hydra-sets, hooks, and slings. Safety standards are thoroughly detailed.
Power spectrum analysis for defect screening in integrated circuit devices
Tangyunyong, Paiboon; Cole Jr., Edward I.; Stein, David J.
2011-12-01
A device sample is screened for defects using its power spectrum in response to a dynamic stimulus. The device sample receives a time-varying electrical signal. The power spectrum of the device sample is measured at one of the pins of the device sample. A defect in the device sample can be identified based on results of comparing the power spectrum with one or more power spectra of the device that have a known defect status.
Compressed Natural Gas Vehicle Maintenance Facility Modification Handbook
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, K.; Melendez, M.; Gonzales, J.
To ensure the safety of personnel and facilities, vehicle maintenance facilities are required by law and by guidelines of the National Fire Protection Association (NFPA) and the International Fire Code (IFC) to exhibit certain design features. They are also required to be fitted with certain fire protection equipment and devices because of the potential for fire or explosion in the event of fuel leakage or spills. All fuels have an explosion or fire potential if specific conditions are present. This handbook covers the primary elements that must be considered when developing a CNG vehicle maintenance facility design that will protectmore » against the ignition of natural gas releases. It also discusses specific protocols and training needed to ensure safety.« less
Soil sampling kit and a method of sampling therewith
Thompson, Cyril V.
1991-01-01
A soil sampling device and a sample containment device for containing a soil sample is disclosed. In addition, a method for taking a soil sample using the soil sampling device and soil sample containment device to minimize the loss of any volatile organic compounds contained in the soil sample prior to analysis is disclosed. The soil sampling device comprises two close fitting, longitudinal tubular members of suitable length, the inner tube having the outward end closed. With the inner closed tube withdrawn a selected distance, the outer tube can be inserted into the ground or other similar soft material to withdraw a sample of material for examination. The inner closed end tube controls the volume of the sample taken and also serves to eject the sample. The soil sample containment device has a sealing member which is adapted to attach to an analytical apparatus which analyzes the volatile organic compounds contained in the sample. The soil sampling device in combination with the soil sample containment device allow an operator to obtain a soil sample containing volatile organic compounds and minimizing the loss of the volatile organic compounds prior to analysis of the soil sample for the volatile organic compounds.
Soil sampling kit and a method of sampling therewith
Thompson, C.V.
1991-02-05
A soil sampling device and a sample containment device for containing a soil sample is disclosed. In addition, a method for taking a soil sample using the soil sampling device and soil sample containment device to minimize the loss of any volatile organic compounds contained in the soil sample prior to analysis is disclosed. The soil sampling device comprises two close fitting, longitudinal tubular members of suitable length, the inner tube having the outward end closed. With the inner closed tube withdrawn a selected distance, the outer tube can be inserted into the ground or other similar soft material to withdraw a sample of material for examination. The inner closed end tube controls the volume of the sample taken and also serves to eject the sample. The soil sample containment device has a sealing member which is adapted to attach to an analytical apparatus which analyzes the volatile organic compounds contained in the sample. The soil sampling device in combination with the soil sample containment device allows an operator to obtain a soil sample containing volatile organic compounds and minimizing the loss of the volatile organic compounds prior to analysis of the soil sample for the volatile organic compounds. 11 figures.
Miura, Takashi; Yokokawa, Ryuji
2016-08-01
Organ culture systems are used to elucidate the mechanisms of pattern formation in developmental biology. Various organ culture techniques have been used, but the lack of microcirculation in such cultures impedes the long-term maintenance of larger tissues. Recent advances in microfluidic devices now enable us to utilize self-organized perfusable capillary networks in organ cultures. In this review, we will overview past approaches to organ culture and current technical advances in microfluidic devices, and discuss possible applications of microfluidics towards the study of developmental biology. © 2016 Japanese Society of Developmental Biologists.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gonzalez Anez, Francisco
This paper presents two development projects (STARMATE and VIRMAN) focused on supporting training on maintenance. Both projects aim at specifying, designing, developing, and demonstrating prototypes allowing computer guided maintenance of complex mechanical elements using Augmented and Virtual Reality techniques. VIRMAN is a Spanish development project. The objective is to create a computer tool for maintenance training course elaborations and training delivery based on 3D virtual reality models of complex components. The training delivery includes 3D record displays on maintenance procedures with all complementary information for intervention understanding. Users are requested to perform the maintenance intervention trying to follow up themore » procedure. Users can be evaluated about the level of knowledge achieved. Instructors can check the evaluation records left during the training sessions. VIRMAN is simple software supported by a regular computer and can be used in an Internet framework. STARMATE is a forward step in the area of virtual reality. STARMATE is a European Commission project in the frame of 'Information Societies Technologies'. A consortium of five companies and one research institute shares their expertise in this new technology. STARMATE provides two main functionalities (1) user assistance for achieving assembly/de-assembly and following maintenance procedures, and (2) workforce training. The project relies on Augmented Reality techniques, which is a growing area in Virtual Reality research. The idea of Augmented Reality is to combine a real scene, viewed by the user, with a virtual scene, generated by a computer, augmenting the reality with additional information. The user interface is see-through goggles, headphones, microphone and an optical tracking system. All these devices are integrated in a helmet connected with two regular computers. The user has his hands free for performing the maintenance intervention and he can navigate in the virtual world thanks to a voice recognition system and a virtual pointing device. The maintenance work is guided with audio instructions, 2D and 3D information are directly displayed into the user's goggles: There is a position-tracking system that allows 3D virtual models to be displayed in the real counterpart positions independently of the user allocation. The user can create his own virtual environment, placing the information required wherever he wants. The STARMATE system is applicable to a large variety of real work situations. (author)« less
Two-dimensional over-all neutronics analysis of the ITER device
NASA Astrophysics Data System (ADS)
Zimin, S.; Takatsu, Hideyuki; Mori, Seiji; Seki, Yasushi; Satoh, Satoshi; Tada, Eisuke; Maki, Koichi
1993-07-01
The present work attempts to carry out a comprehensive neutronics analysis of the International Thermonuclear Experimental Reactor (ITER) developed during the Conceptual Design Activities (CDA). The two-dimensional cylindrical over-all calculational models of ITER CDA device including the first wall, blanket, shield, vacuum vessel, magnets, cryostat and support structures were developed for this purpose with a help of the DOGII code. Two dimensional DOT 3.5 code with the FUSION-40 nuclear data library was employed for transport calculations of neutron and gamma ray fluxes, tritium breeding ratio (TBR), and nuclear heating in reactor components. The induced activity calculational code CINAC was employed for the calculations of exposure dose rate after reactor shutdown around the ITER CDA device. The two-dimensional over-all calculational model includes the design specifics such as the pebble bed Li2O/Be layered blanket, the thin double wall vacuum vessel, the concrete cryostat integrated with the over-all ITER design, the top maintenance shield plug, the additional ring biological shield placed under the top cryostat lid around the above-mentioned top maintenance shield plug etc. All the above-mentioned design specifics were included in the employed calculational models. Some alternative design options, such as the water-rich shielding blanket instead of lithium-bearing one, the additional biological shield plug at the top zone between the poloidal field (PF) coil No. 5, and the maintenance shield plug, were calculated as well. Much efforts have been focused on analyses of obtained results. These analyses aimed to obtain necessary recommendations on improving the ITER CDA design.
The purpose of this SOP is to ensure suitable temperature maintenance of freezers used for storage of samples. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the "Border" study. Keywords: freezers; operation.
The National H...
The purpose of this SOP is to assure suitable temperature maintenance in refrigerators and freezers used for sample storage during the Arizona NHEXAS project and the "Border" study. Keywords: lab; equipment; refrigerators and freezers.
The National Human Exposure Assessment Su...
A PROPOSED CHEMICAL INFORMATION AND DATA SYSTEM. VOLUME I.
CHEMICAL COMPOUNDS, *DATA PROCESSING, *INFORMATION RETRIEVAL, * CHEMICAL ANALYSIS, INPUT OUTPUT DEVICES, COMPUTER PROGRAMMING, CLASSIFICATION...CONFIGURATIONS, DATA STORAGE SYSTEMS, ATOMS, MOLECULES, PERFORMANCE( ENGINEERING ), MAINTENANCE, SUBJECT INDEXING, MAGNETIC TAPE, AUTOMATIC, MILITARY REQUIREMENTS, TYPEWRITERS, OPTICS, TOPOLOGY, STATISTICAL ANALYSIS, FLOW CHARTING.
49 CFR 236.15 - Timetable instructions.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.15 Timetable instructions. Automatic block, traffic control, train stop, train control and cab signal territory shall be designated in timetable instructions. ...
49 CFR 236.15 - Timetable instructions.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.15 Timetable instructions. Automatic block, traffic control, train stop, train control and cab signal territory shall be designated in timetable instructions. ...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
1982-02-01
evacuation, essential maintenance, transportation, decontamination, and field services (i.e., replacements, graves registration, finance , etc.). 2...such logic through the tactical decision rules input by the user. With such a device, the UNICORN nuclear weapons 78 -T -- : I-, -- r, Pow- allocation
46 CFR 122.720 - Weekly maintenance and inspections.
Code of Federal Regulations, 2014 CFR
2014-10-01
... battery for rescue boat engine starting must be brought up to full charge at least once each week if: (1) The battery is of a type that requires recharging; and (2) The battery is not connected to a device...
46 CFR 122.720 - Weekly maintenance and inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
... battery for rescue boat engine starting must be brought up to full charge at least once each week if: (1) The battery is of a type that requires recharging; and (2) The battery is not connected to a device...
46 CFR 122.720 - Weekly maintenance and inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
... battery for rescue boat engine starting must be brought up to full charge at least once each week if: (1) The battery is of a type that requires recharging; and (2) The battery is not connected to a device...
46 CFR 122.720 - Weekly maintenance and inspections.
Code of Federal Regulations, 2013 CFR
2013-10-01
... battery for rescue boat engine starting must be brought up to full charge at least once each week if: (1) The battery is of a type that requires recharging; and (2) The battery is not connected to a device...
46 CFR 122.720 - Weekly maintenance and inspections.
Code of Federal Regulations, 2012 CFR
2012-10-01
... battery for rescue boat engine starting must be brought up to full charge at least once each week if: (1) The battery is of a type that requires recharging; and (2) The battery is not connected to a device...
Portable positive protection : a guide for short duration and short term work zones.
DOT National Transportation Integrated Search
2016-06-01
Transportation agencies, contractors, researchers, and private vendors are actively looking for new methods and devices : to help make construction and maintenance work zones safer while maximizing mobility. Short-term and short-duration : work zones...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Interlocking Rules and Instructions... derail and displaying an aspect indicating stop cannot be operated to display a less restrictive aspect...
Design of a secure remote management module for a software-operated medical device.
Burnik, Urban; Dobravec, Štefan; Meža, Marko
2017-12-09
Software-based medical devices need to be maintained throughout their entire life cycle. The efficiency of after-sales maintenance can be improved by managing medical systems remotely. This paper presents how to design the remote access function extensions in order to prevent risks imposed by uncontrolled remote access. A thorough analysis of standards and legislation requirements regarding safe operation and risk management of medical devices is presented. Based on the formal requirements, a multi-layer machine design solution is proposed that eliminates remote connectivity risks by strict separation of regular device functionalities from remote management service, deploys encrypted communication links and uses digital signatures to prevent mishandling of software images. The proposed system may also be used as an efficient version update of the existing medical device designs.
Goethals, Pauwel; Chaobal, Harshu; Reynaerts, Dominiek; Schaner, David
2014-04-01
We present a new device for verifying endotracheal tube (ETT) position that uses specialized sensors intended to distinguish anatomical features of the trachea and esophagus. This device has the potential to increase the safety of resuscitation, surgery, and mechanical ventilation and decrease the morbidity, mortality, and health care costs associated with esophageal intubation and unintended extubation by potentially improving the process and maintenance of endotracheal intubation. The device consists of a tactile sensor connected to the airway occlusion cuff of an ETT. It is intended to detect the presence or absence of tracheal rings immediately upon inflation of the airway occlusion cuff. The initial study detailed here verifies that a prototype device can detect contours similar to tracheal rings in a tracheal model.
Promoting child passenger safety in children served by a health maintenance organization.
Chang, A; Hearey, C D; Gallagher, K D; English, P; Chang, P C
1989-06-01
A patient education program, based on the health belief model, promoting child passenger safety was developed and implemented at a health maintenance organization. The program included individual counseling by pediatricians, use of audiovisual materials and pamphlets, and (for newborn infants) a home visit by a child safety specialist. Based on parking lot observations, child safety device use increased to greater than 60% in both intervention and comparison-group children 1-4 years of age. During the child health supervision visit, pediatricians can play a leadership role in promoting child passenger safety.
Progress toward an advanced condition monitoring system for reusable rocket engines
NASA Technical Reports Server (NTRS)
Maram, J.; Barkhoudarian, S.
1987-01-01
A new generation of advanced sensor technologies will allow the direct measurement of critical/degradable rocket engine components' health and the detection of degraded conditions before component deterioration affects engine performance, leading to substantial improvements in reusable engines' operation and maintenance. When combined with a computer-based engine condition-monitoring system, these sensors can furnish a continuously updated data base for the prediction of engine availability and advanced warning of emergent maintenance requirements. Attention is given to the case of a practical turbopump and combustion device diagnostic/prognostic health-monitoring system.
Wang, Rui; Luo, Ou; He, Liu; Li, Jia-Xin; Zhang, Ming-Guang
2012-11-01
In Mainland China, heparin saline solution is commonly used for flushing and locking peripheral intravenous access devices in clinical practice for a long time. We conducted a prospective controlled trial to compare the effectiveness and safety of preservative-free 0.9% sodium chloride solution versus heparin saline solution as flushing and locking solution for peripheral intravenous access devices. Patients with gastroenterological or hepatic diseases were enrolled for this study from August 2011 to October 2011. After non-randomized allocation, preservative-free 0.9% sodium chloride was used as flushing and locking solution in the sodium chloride solution group, while hepatic solution (10 U/mL) was given in the heparin saline solution group. The device related complications and its maintenance duration were compared between two groups. One-way ANOVA, Chi(2), or Mantel-Haenszel test were performed using SPSS 13.0 and RevMan 5.0. Totally, 181 and 178 peripheral intravenous access devices in the sodium chloride solution and heparin saline solution groups were included and analyzed. Results indicated than sodium chloride solution did not increase the risks of occlusion (7.7% vs. 7.9%) and other adverse events of peripheral intravenous access devices (P = 0.163). Sodium chloride solution neither shortened the duration of peripheral intravenous access devices maintenance (3.6 ± 1.1 days vs. 3.7 ± 1.2 days, P = 0.651), nor increased the proportion of abnormal withdrawal (29.3% vs. 31.5%, P = 0.654). Sodium chloride solution is as effective and safe as conventional heparin saline solution for flushing and locking peripheral intravenous access devices, which results from our evidence-based study and should be transferred to other nurses in China. © 2012 Wiley Publishing Asia Pty Ltd and Chinese Cochrane Center, West China Hospital of Sichuan University.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vold, E.
1998-03-01
Data which have been collected by Los Alamos National Laboratory waste management for the hydrologic characterization of the subsurface at the low level radioactive waste disposal facility, Area G, are reported and discussed briefly. The data includes Unsaturated Flow Apparatus measurements of the unsaturated conductivity in samples from borehole G-5. Analysis compares these values to the predictions from van Genuchten estimates, and the implications for transport and data matching are discussed, especially at the location of the Vapor Phase Notch (VPN). There, evaporation drives a significant vapor flux and the liquid flux cannot be measured accurately by the UFA device.more » Data also include hydrologic characterization of samples from borehole G-5, Area G surface soils, Los Alamos (Cerros de Rio) basalt, Tsankawi and Cerro-Toledo layers, the Vapor Phase Notch (VPN), and additional new samples from the uppermost tuff layer at Area G. Hydraulic properties from these sample groups can be used to supplement the existing data base. The data in this report can be used to improve the accuracy and reduce the uncertainty in future computational modeling of the unsaturated transport at Area G. This report supports the maintenance plan for the Area G Performance Assessment.« less
Kulstad, Erik; Metzger, Anja K; Courtney, D Mark; Rees, Jennifer; Shanley, Patrick; Matsuura, Timothy; McKnite, Scott; Lurie, Keith
2013-11-01
To evaluate a novel esophageal heat transfer device for use in inducing, maintaining, and reversing hypothermia. We hypothesized that this device could successfully induce, maintain (within a 1 °C range of goal temperature), and reverse, mild therapeutic hypothermia in a large animal model over a 30-h treatment protocol. Five female Yorkshire swine, weighing a mean of 65 kg (range 61-70) kg each, were anesthetized with inhalational isoflurane via endotracheal intubation and instrumented. The esophageal device was connected to an external chiller and then placed into the esophagus and connected to wall suction. Reduction to goal temperature was achieved by setting the chiller to cooling mode, and a 24h cooling protocol was completed before rewarming and recovering the animals. Histopathologic analysis was scheduled for 3-14 days after protocol completion. Average baseline temperature for the 5 animals was 38.6 °C (range 38.1-39.2 °C). All swine were cooled successfully, with average rate of temperature decrease of 1.3 °C/h (range 1.1-1.9) °C/h. Standard deviation from goal temperature averaged 0.2 °C throughout the steady-state maintenance phase, and no treatment for shivering was necessary during the protocol. Histopathology of esophageal tissue showed no adverse effects from the device. A new esophageal heat transfer device successfully and safely induced, maintained, and reversed therapeutic hypothermia in large swine. Goal temperature was maintained within a narrow range, and thermogenic shivering did not occur. These findings suggest a useful new modality to induce therapeutic hypothermia. Copyright © 2013 The Authors. Published by Elsevier Ireland Ltd.. All rights reserved.
7 CFR 58.227 - Sampling device.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 3 2010-01-01 2010-01-01 false Sampling device. 58.227 Section 58.227 Agriculture....227 Sampling device. If automatic sampling devices are used, they shall be constructed in such a.... The type of sampler and the sampling procedure shall be as approved by the Administrator. ...
7 CFR 58.227 - Sampling device.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 3 2011-01-01 2011-01-01 false Sampling device. 58.227 Section 58.227 Agriculture....227 Sampling device. If automatic sampling devices are used, they shall be constructed in such a.... The type of sampler and the sampling procedure shall be as approved by the Administrator. ...
The purpose of this SOP is to assure suitable temperature maintenance in refrigerators and freezers used for sample storage during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment; refrigerators and freezers.
The U.S.-Mexico Border Program is sponsored...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.714 Cab. The compartment of a locomotive from which the propelling power and power brakes of the train are manually...
Determination of traffic control device selection for nighttime maintenance of traffic.
DOT National Transportation Integrated Search
2010-01-01
Each year more than 700 fatalities occur nationally due to vehicular accidents within work zones. : [1] New developments and technologies have paved the way for the creation of diamond grade : sheeting, a new, more retroreflective sheeting. Research ...
Code of Federal Regulations, 2013 CFR
2013-10-01
... control operator. On-track roadway maintenance machine means a self-propelled, rail-mounted, non-highway... the workplace and who is authorized to take prompt corrective measures to eliminate them. Control... a control operator. Deceleration device means any mechanism, including, but not limited to, rope...
Code of Federal Regulations, 2014 CFR
2014-01-01
... adequate periods of time and at a location approved by the Administrator, adequate flight training equipment and courseware, including at least one flight simulator or advanced flight training device. [Doc... significant distractions caused by flight operations and maintenance operations at the airport. (b) An...
Code of Federal Regulations, 2011 CFR
2011-01-01
... adequate periods of time and at a location approved by the Administrator, adequate flight training equipment and courseware, including at least one flight simulator or advanced flight training device. [Doc... significant distractions caused by flight operations and maintenance operations at the airport. (b) An...
Code of Federal Regulations, 2013 CFR
2013-01-01
... adequate periods of time and at a location approved by the Administrator, adequate flight training equipment and courseware, including at least one flight simulator or advanced flight training device. [Doc... significant distractions caused by flight operations and maintenance operations at the airport. (b) An...
Code of Federal Regulations, 2012 CFR
2012-01-01
... adequate periods of time and at a location approved by the Administrator, adequate flight training equipment and courseware, including at least one flight simulator or advanced flight training device. [Doc... significant distractions caused by flight operations and maintenance operations at the airport. (b) An...
40 CFR 86.096-38 - Maintenance instructions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and distributing the information, excluding any research and development costs incurred in designing... available through, for example, generic aftermarket tools, a pass-through device, or inexpensive... dealerships, whichever is earlier. The index shall describe the title of the course or instructional session...
40 CFR 86.1808-01 - Maintenance instructions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and distributing the information, excluding any research and development costs incurred in designing... available through, for example, generic aftermarket tools, a pass-through device, or inexpensive... dealerships, whichever is earlier. The index shall describe the title of the course or instructional session...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Shoe, latch. 236.801 Section 236.801 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.801...
Thirsk performs IFM on cable cartridge
2009-06-23
ISS020-E-013990 (23 June 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, performs in-flight maintenance on a cable cartridge for the advanced Resistive Exercise Device (aRED) in the Unity node of the International Space Station.
A Critical Assessment of the Evidence for Low-Level Laser Therapy in the Treatment of Hair Loss.
Gupta, Aditya K; Foley, Kelly A
2017-02-01
Low-level laser therapy (LLLT) is currently in use to stimulate hair growth and is quickly gaining in popularity due to the ease of use and absence of side effects. In 2015 alone, the number of LLLT devices with the Food and Drug Administration clearance has doubled. To consolidate evidence and establish which data are still required for the widespread acceptance of LLLT for hair loss therapy. A thorough search of the PubMed database was conducted to obtain studies investigating LLLT for androgenetic alopecia in men and women. Nine trials were identified for comb and helmet/cap devices, five of which were randomized controlled trials. Data comparison across LLLT trials and with traditional hair loss therapy (minoxidil, finasteride) was not straight forward because there was a lack of visual evidence, sample sizes were low, and there were large variations in study duration and efficacy measurements. There are a number of unanswered questions about the optimum treatment regimen, including maintenance treatment and the long-term consequences of LLLT use. Moving forward, protocols should be standardized across trials. Moreover, it is recommended that future trials include visual evidence and trial duration be expanded to 12 months.
A Improved and Highly Effective Seabed Surface Sand Sampling Device
NASA Astrophysics Data System (ADS)
Liu, Ying
2017-04-01
In marine geology research, it is necessary to obtain a sufficient quantity of seabed surface samples, while also ensuring that the samples are in their original state. Currently, there are a number of seabed surface sampling devices available, but it is very difficult to obtain sand samples using ordinary seabed surface sampling devices, whereas machine-controlled seabed surface sampling devices are unable to dive into deeper regions of water. To obtain larger quantities of samples in their original states, many researchers have tried to improve seabed surface sampling devices, but these efforts have generally produced ambiguous results. To resolve the aforementioned issue, we have designed an improved and highly effective seabed surface sand sampling device, which incorporates the strengths of a variety of sampling devices; it is capable of diving into deeper water regions to obtain sand samples, and is also suited for use in streams, rivers, lakes and seas with varying levels of flow velocities and depth.
Instruments speak global language
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nudo, L.
1993-07-01
If all goes as planned, companies that use instruments for measurement and control will get more complete, reliable and repeatable information about their processes with advanced digital devices that speak a global language. That language, in technical terms, is known as international fieldbus. But it's not much different from English's role as the international language of business. Companies that use a remote measurement device for environmental applications, such as pH control and fugitive emissions control, are candidates for fieldbus devices, which are much faster and measure more process variables than their counterpart analog devices. With the advent of a globalmore » fieldbus, users will see digital valves, solenoids and multivariable transmitters. Fieldbus technology redefines the roles of the control system and field devices. The control system still serves as a central clearinghouse, but field devices will handle more control and reporting functions and generate data that can be used for trending and preventive maintenance.« less
Jokerst, Jesse V.; Floriano, Pierre N.; Christodoulides, Nicolaos; Simmons, Glennon W.; McDevitt, John T.
2010-01-01
Recent humanitarian efforts have led to the widespread release of antiretroviral drugs for the treatment of the more than 33 million HIV afflicted people living in resource-scarce settings. Here, the enumeration of CD4+ T lymphocytes is required to establish the level at which the immune system has been compromised. The gold standard method used in developed countries, based on flow cytometry, though widely accepted and accurate, is precluded from widespread use in resource-scarce settings due to its high expense, high technical requirements, difficulty in operation-maintenance and the lack of portability for these sophisticated laboratory-confined systems. As part of continuing efforts to develop practical diagnostic instrumentation, the integration of semiconductor nanocrystals (quantum dots, QDs) into a portable microfluidic-based lymphocyte capture and detection device is completed. This integrated system is capable of isolating and counting selected lymphocyte sub-populations (CD3+CD4+) from whole blood samples. By combining the unique optical properties of the QDs with the sample handling capabilities and cost effectiveness of novel microfluidic systems, a practical, portable lymphocyte measurement modality that correlates nicely with flow cytometry (R2 = 0.97) has been developed. This QD-based system reduces the optical requirements significantly relative to molecular fluorophores and the mini-CD4 counting device is projected to be suitable for use in both point-of-need and resource-scarce settings. PMID:19023471
Discreet passive explosive detection through 2-sided waveguided fluorescence
Harper, Ross James [Stillwater, OK; la Grone, Marcus [Cushing, OK; Fisher, Mark [Stillwater, OK
2011-10-18
The current invention provides a passive sampling device suitable for collecting and detecting the presence of target analytes. In particular, the passive sampling device is suitable for detecting nitro-aromatic compounds. The current invention further provides a passive sampling device reader suitable for determining the collection of target analytes. Additionally, the current invention provides methods for detecting target analytes using the passive sampling device and the passive sampling device reader.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMaster, B.W.; Jones, S.B.; Sitzler, J.L.
1995-06-01
This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for pluggingmore » and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.« less
Guide for preparing active solar heating systems operation and maintenance manuals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-01-01
This book presents a systematic and standardized approach to the preparation of operation and maintenance manuals for active solar heating systems. Provides an industry consensus of the best operating and maintenance procedures for large commercial-scale solar service water and space heating systems. A sample O M manual is included. 3-ring binder included.
21 CFR 868.1100 - Arterial blood sampling kit.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Arterial blood sampling kit. 868.1100 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Diagnostic Devices § 868.1100 Arterial blood sampling kit. (a) Identification. An arterial blood sampling kit is a device, in kit form, used to obtain arterial blood samples...
21 CFR 868.1100 - Arterial blood sampling kit.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Arterial blood sampling kit. 868.1100 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Diagnostic Devices § 868.1100 Arterial blood sampling kit. (a) Identification. An arterial blood sampling kit is a device, in kit form, used to obtain arterial blood samples...
21 CFR 868.1100 - Arterial blood sampling kit.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Arterial blood sampling kit. 868.1100 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Diagnostic Devices § 868.1100 Arterial blood sampling kit. (a) Identification. An arterial blood sampling kit is a device, in kit form, used to obtain arterial blood samples...
21 CFR 868.1100 - Arterial blood sampling kit.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Arterial blood sampling kit. 868.1100 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Diagnostic Devices § 868.1100 Arterial blood sampling kit. (a) Identification. An arterial blood sampling kit is a device, in kit form, used to obtain arterial blood samples...
21 CFR 868.1100 - Arterial blood sampling kit.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Arterial blood sampling kit. 868.1100 Section 868...) MEDICAL DEVICES ANESTHESIOLOGY DEVICES Diagnostic Devices § 868.1100 Arterial blood sampling kit. (a) Identification. An arterial blood sampling kit is a device, in kit form, used to obtain arterial blood samples...
Advances in bioartificial liver assist devices.
Patzer, J F
2001-11-01
Rapid advances in development of bioartificial liver assist devices (BLADs) are exciting clinical interest in the application of BLAD technology for support of patients with acute liver failure. Four devices (Circe Biomedical HepatAssist, Vitagen ELAD, Gerlach BELS, and Excorp Medical BLSS) that rely on hepatocytes cultured in hollow-fiber membrane technology are currently in various stages of clinical evaluation. Several alternative approaches for culture and perfusion of hepatocytes have been evaluated in preclinical, large animal models of liver failure, or at a laboratory scale. Engineering design issues with respect to xenotransplantation, BLAD perfusion, hepatocyte functionality and culture maintenance, and ultimate distribution of a BLAD to a clinical site are delineated.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (2) Chapter 303—National Driver Register. (3) Chapter 305—National Automobile Title Information.... (7) Chapter 327—Odometers. (8) Chapter 329—Automobile Fuel Economy. (9) Chapter 331—Theft Prevention... and maintenance, traffic control devices, identification and surveillance of accident locations, and...
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (2) Chapter 303—National Driver Register. (3) Chapter 305—National Automobile Title Information.... (7) Chapter 327—Odometers. (8) Chapter 329—Automobile Fuel Economy. (9) Chapter 331—Theft Prevention... and maintenance, traffic control devices, identification and surveillance of accident locations, and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Cut-section. 236.736 Section 236.736 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.736 Cut...
49 CFR 236.742 - Dog, locking.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Dog, locking. 236.742 Section 236.742 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.742 Dog...
49 CFR 236.742 - Dog, locking.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Dog, locking. 236.742 Section 236.742 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.742 Dog...
49 CFR 236.742 - Dog, locking.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Dog, locking. 236.742 Section 236.742 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.742 Dog...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
HANDBOOK: OPERATION AND MAINTENANCE OF HOSPITAL WASTE INCINERATORS
Proper operation of the incinerator will reduce the emissions of most of these pollutants. ir pollution control devices are available to further control these pollutants. ecause of the national interest in hospital medical waste and the need for technology application, the Center...
49 CFR 236.742 - Dog, locking.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Dog, locking. 236.742 Section 236.742 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.742 Dog...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Cut-section. 236.736 Section 236.736 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.736 Cut...
49 CFR 236.702 - Arm, semaphore.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Arm, semaphore. 236.702 Section 236.702 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.702 Arm...
49 CFR 236.702 - Arm, semaphore.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Arm, semaphore. 236.702 Section 236.702 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.702 Arm...
49 CFR 236.702 - Arm, semaphore.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Arm, semaphore. 236.702 Section 236.702 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.702 Arm...
49 CFR 236.702 - Arm, semaphore.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Arm, semaphore. 236.702 Section 236.702 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.702 Arm...
49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...
49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...
49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...
49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...
49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...
9 CFR 318.307 - Record review and maintenance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... temperature/time recording devices shall be identified by production date, container code, processing vessel... made available to Program employees for review. (b) Automated process monitoring and recordkeeping. Automated process monitoring and recordkeeping systems shall be designed and operated in a manner that will...
9 CFR 318.307 - Record review and maintenance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... temperature/time recording devices shall be identified by production date, container code, processing vessel... made available to Program employees for review. (b) Automated process monitoring and recordkeeping. Automated process monitoring and recordkeeping systems shall be designed and operated in a manner that will...
9 CFR 318.307 - Record review and maintenance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... temperature/time recording devices shall be identified by production date, container code, processing vessel... made available to Program employees for review. (b) Automated process monitoring and recordkeeping. Automated process monitoring and recordkeeping systems shall be designed and operated in a manner that will...
9 CFR 318.307 - Record review and maintenance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... temperature/time recording devices shall be identified by production date, container code, processing vessel... made available to Program employees for review. (b) Automated process monitoring and recordkeeping. Automated process monitoring and recordkeeping systems shall be designed and operated in a manner that will...
9 CFR 318.307 - Record review and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... temperature/time recording devices shall be identified by production date, container code, processing vessel... made available to Program employees for review. (b) Automated process monitoring and recordkeeping. Automated process monitoring and recordkeeping systems shall be designed and operated in a manner that will...
30 CFR 57.14103 - Operators' stations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Equipment Safety Devices and Maintenance Requirements § 57.14103 Operators' stations. (a) If windows are provided on operators' stations of self-propelled mobile equipment, the windows shall be made of safety glass or material with equivalent safety characteristics. The windows shall be maintained to provide...
Backing warning sensors for tow plows.
DOT National Transportation Integrated Search
2013-06-01
Backup warning system devices were evaluated to determine if they would alert winter maintenance snow : plow drivers to obstacles directly behind the trailer and out of view of the driver when a unit is backed up. : When the sensors on the back of th...
49 CFR 236.742 - Dog, locking.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Dog, locking. 236.742 Section 236.742 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.742 Dog...
Characterization of Dust on Solar Devices in Southern Nevada =
NASA Astrophysics Data System (ADS)
Sylva, Jason R.
Dust can impact the efficiency of solar energy collection devices, and in some arid environments, dust can reduce solar energy efficiency up to 30%. Reducing the impact of dust is therefore critical in the expansion of solar technology throughout regions where solar energy is utilized. Characterization of suspended and settled particulate matter can assist in developing strategies for dust mitigation. With the characterization of suspended and settled particulate in remote, rural, and urban environments, more informed decisions can be made regarding the selection of coating material on solar panels as well as developing cleaning and maintenance procedures. Particulate matter that deposits on a solar surface can potentially interact with solar radiation, precipitation, or even directly with the surface material itself. These interactions could lead to the formation of coatings that reduce/block radiation and/or degrade the integrity of the surface. When you extrapolate these possibilities to a larger scale preliminary characterization of dust will play a vital role when planning the construction of a solar energy facility. A variety of sampling techniques were employed to obtain particulate matter for characterization. These included direct collection of particulates from solar surfaces: via vacuum and wipe sample collection on panels, tacky dot adhesive slides and plain slides that were exposed at different intervals, desert vugs that are natural particulate collectors, as well as high volume air sampling for collection of suspended particulates. High volume air sampling was performed using glass fiber filters and 2 micron stainless steel screens. Direct collection of settled particulates was performed by sampling from solar surfaces, vugs, and by collection on exposed glass surfaces. Collection onto glass surfaces was achieved by setting up a plain microscope slide, tacky dot slides, and panes of glass. The sampling methodology allowed for the collection of samples for analyses using various analytical methods that included Raman microspectroscopy, pyrolysis gas chromatography mass spectrometry, ion chromatography and inductively coupled plasma mass spectrometry. These various methods allow for identification of organic and inorganic components as well the mineral distribution of suspended and settled particulate material. None None None None None
CAMAC: A Unique Application with a Pocket Terminal.
1982-09-16
POCKET TERMINAL S. PERFORMING ORG. REPORT NUMSIER I. AUTWOR(o) S. CONTRACT OR GRANT NUMU41’e() A.D. Elmond S. PERFORMING ORGANIZATION NAME AND ADORIESS 10...port of any CAMAC crate. In addition to being a maintenance device, the HHTT is a " smart " device that can control operations in a CAMAC crate. The...system LSI 11/23 microprocessor through an Asynchronous Serial Port (ASP) interface module. This ASP interface consists of: 1) Crystal Clock 2) MIK -Bus
A Simulation Model for Procedure Inference from a Mental Model for a Simple Device.
1984-05-25
can flow to, and the indicator lights show where the power is present. According to these results, the critical information is the system topology...show the flow of power into the energon storage system. Maintenance of a collapsed energon ring requires a supply of vector bosons which is...model; in some tasks there is clearly no effect. The device model in that study was developed intuitivIy. But upon examining the model in light of the
1990-12-01
expected values. However, because the same good /bad output pattern of a device always gives rise to the same initial ordering, the method has its limitation...For any device and good /bad output pattern, it is easy to come up with an example on which the method does poorly in the sense that the actual...submodule is hss likely to be faulty if it is connec d to more good primary outputs. Initially, candidates are ordered according to their relat -nships with
Proton beam therapy control system
Baumann, Michael A [Riverside, CA; Beloussov, Alexandre V [Bernardino, CA; Bakir, Julide [Alta Loma, CA; Armon, Deganit [Redlands, CA; Olsen, Howard B [Colton, CA; Salem, Dana [Riverside, CA
2008-07-08
A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.
Proton beam therapy control system
Baumann, Michael A.; Beloussov, Alexandre V.; Bakir, Julide; Armon, Deganit; Olsen, Howard B.; Salem, Dana
2010-09-21
A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.
Proton beam therapy control system
Baumann, Michael A; Beloussov, Alexandre V; Bakir, Julide; Armon, Deganit; Olsen, Howard B; Salem, Dana
2013-06-25
A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.
Proton beam therapy control system
Baumann, Michael A; Beloussov, Alexandre V; Bakir, Julide; Armon, Deganit; Olsen, Howard B; Salem, Dana
2013-12-03
A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.
Discreet passive explosive detection through 2-sided wave guided fluorescence
Harper, Ross James; la Grone, Marcus; Fisher, Mark
2012-10-16
The current invention provides a passive sampling device suitable for collecting and detecting the presence of target analytes. In particular, the passive sampling device is suitable for detecting nitro-aromatic compounds. The current invention further provides a passive sampling device reader suitable for determining the collection of target analytes. Additionally, the current invention provides methods for detecting target analytes using the passive sampling device and the passive sampling device reader.
[Thermolabile drugs: pharmacist intervention as a guarantee of cold chain maintenance].
Ricote-Lobera, I; Santos-Mena, B; Fraile-Gil, S; Ortiz-Martín, B; Hidalgo-Correas, F J; García-Díaz, B
2014-05-01
To determine whether pharmacist is able to guarantee cold chain maintenance of thermolabile drugs during transport using the available information in the reception process and to compare these results with those obtained in a subsequent intervention phase, in which the manufacturing laboratories were contacted. Intervention study, prospective and comparative"before-after". It was analyzed the storage conditions during transport of all thermolabile drugs received in a 400-bed hospital for 3 months, excluding those from clinical trials. The intervention allowed to ensure cold chain maintenance in 76,5% (n = 488) of received drugs, representing an increase of 41,8% (IC 95% 36,7-46,6%; p < 0,001) compared with the percentage obtained before the intervention. The pharmacist isn't able to ensure the cold chain maintenance of received thermolabile drugs without temperature monitoring device (64,6%). Reports requested from laboratories allowed to increase significantly that percentage. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.
1992-08-01
Areas 4-1 4.1.2 POL Area 4-1 4.1.3 Aircraft Maintenance and Storage Area 4-5 4.1.4 Revetment Area 4-5 4.1.5 Former Sewage Treatment Plant 4-5 4.1.6...Building 442 4-10 4.2 Groundwater Investigations 4-10 4.2.1 POL Area 4-10 4.2.2 Aircraft Storage and Maintenance Area 4-10 4.2.3 Revetment Area 4...Locations. 4-4 4.2 POL Area - Phase 2 Boring Locations 4-6 4.3 Aircraft Maintenance Area - Phase 2 Borings and Sediment Samples 4-7 4.4 Revetment
Yun, Dong-Ju; Lee, Sang-Jin; Park, Sang-Joon; Oh, Hyeong Seok; Lee, Young Jae; Oh, Hyun Min; Lee, Sang-Ho
2017-01-01
A new zero-profile, standalone device (Zero P) was recently developed and has shown a lower incidence rate of complications and competitive clinical outcomes compared with anterior cervical cage with plate construct (CP) in single and multilevel anterior cervical diskectomy and fusion (ACDF). However, there is still concern whether Zero P is appropriate for multilevel ACDF. In addition, there have been few reports of contiguous 2-level ACDF used in conjunction with Zero P. We reviewed contiguous 2-level ACDF performed from December 2006 to February 2015. A total of 63 patients met inclusion criteria for the study (CP group = 32 cases; Zero P group = 31 cases). All preoperative and postoperative clinical and radiologic parameters were recorded. These parameters were compared between both groups. The postoperative change of Cobb S over time in the Zero P group was significantly different from that in the CP group. The maintenance of Cobb S in the Zero P group was better than that in the CP group (P < 0.05). The maintenance of anterior intervertebral disk height (IDH) at postoperative assessment for the Zero P group was significantly better than that in the CP group (P < 0.05). Within-group comparison of the postoperative change of anterior and posterior IDH over time revealed that the anterior IDH was significantly lower than the posterior IDH in the Zero P group (P < 0.05). For 2-level contiguous ACDF, the use of a zero-profile device has the capacity to show compatible outcomes in correction and maintenance of segmental angle if the anterior titanium alloy plate is properly positioned at the anterior vertebral line. Copyright © 2016 Elsevier Inc. All rights reserved.
A Improved Seabed Surface Sand Sampling Device
NASA Astrophysics Data System (ADS)
Luo, X.
2017-12-01
In marine geology research it is necessary to obtain a suf fcient quantity of seabed surface samples, while also en- suring that the samples are in their original state. Currently,there are a number of seabed surface sampling devices available, but we fnd it is very diffcult to obtain sand samples using these devices, particularly when dealing with fne sand. Machine-controlled seabed surface sampling devices are also available, but generally unable to dive into deeper regions of water. To obtain larger quantities of seabed surface sand samples in their original states, many researchers have tried to improve upon sampling devices,but these efforts have generally produced ambiguous results, in our opinion.To resolve this issue, we have designed an improved andhighly effective seabed surface sand sampling device that incorporates the strengths of a variety of sampling devices. It is capable of diving into deepwater to obtain fne sand samples and is also suited for use in streams, rivers, lakes and seas with varying levels of depth (up to 100 m). This device can be used for geological mapping, underwater prospecting, geological engineering and ecological, environmental studies in both marine and terrestrial waters.
[A comparative study of maintenance services using the data-mining technique].
Cruz, Antonio M; Aguilera-Huertas, Wilmer A; Días-Mora, Darío A
2009-08-01
The main goal in this research was comparing two hospitals' maintenance service quality. One of them had a contract service; the other one had an in-house maintenance service. The authors followed the next stages when conducting this research: domain understanding, data characterisation and sample reduction, insight characterisation and building the TAT predictor. Multiple linear regression and clustering techniques were used for improving the efficiency of corrective maintenance tasks in a clinical engineering department (CED). The indicator being studied was turnaround time (TAT). The institution having an in-house maintenance service had better quality indicators than the contract maintenance service. There was lineal dependence between availability and service productivity.
NASA Technical Reports Server (NTRS)
McConnell, Joshua B.
2000-01-01
The scientific exploration of Mars will require the collection and return of subterranean samples to Earth for examination. This necessitates the use of some type of device or devices that possesses the ability to effectively penetrate the Martian surface, collect suitable samples and return them to the surface in a manner consistent with imposed scientific constraints. The first opportunity for such a device will occur on the 2003 and 2005 Mars Sample Return missions, being performed by NASA. This paper reviews the work completed on the compilation of a database containing viable penetrating and sampling devices, the performance of a system level trade study comparing selected devices to a set of prescribed parameters and the employment of a metric for the evaluation and ranking of the traded penetration and sampling devices, with respect to possible usage on the 03 and 05 sample return missions. The trade study performed is based on a select set of scientific, engineering, programmatic and socio-political criterion. The use of a metric for the various penetration and sampling devices will act to expedite current and future device selection.
NASA Astrophysics Data System (ADS)
Adeyeri, Michael Kanisuru; Mpofu, Khumbulani
2017-06-01
The article is centred on software system development for manufacturing company that produces polyethylene bags using mostly conventional machines in a competitive world where each business enterprise desires to stand tall. This is meant to assist in gaining market shares, taking maintenance and production decisions by the dynamism and flexibilities embedded in the package as customers' demand varies under the duress of meeting the set goals. The production and machine condition monitoring software (PMCMS) is programmed in C# and designed in such a way to support hardware integration, real-time machine conditions monitoring, which is based on condition maintenance approach, maintenance decision suggestions and suitable production strategies as the demand for products keeps changing in a highly competitive environment. PMCMS works with an embedded device which feeds it with data from the various machines being monitored at the workstation, and the data are read at the base station through transmission via a wireless transceiver and stored in a database. A case study was used in the implementation of the developed system, and the results show that it can monitor the machine's health condition effectively by displaying machines' health status, gives repair suggestions to probable faults, decides strategy for both production methods and maintenance, and, thus, can enhance maintenance performance obviously.
NASA Technical Reports Server (NTRS)
Studenick, D. K. (Inventor)
1977-01-01
An inlet leak is described for sampling gases, more specifically, for selectively sampling multiple fluids. This fluid sampling device includes a support frame. A plurality of fluid inlet devices extend through the support frame and each of the fluid inlet devices include a longitudinal aperture. An opening device that is responsive to a control signal selectively opens the aperture to allow fluid passage. A closing device that is responsive to another control signal selectively closes the aperture for terminating further fluid flow.
Design considerations for medical devices in the home environment.
Kaufman-Rivi, Diana; Collins-Mitchell, Janette; Jetley, Raoul
2010-01-01
Patient demographics, economic forces, and technological advancements contribute to the rise in home care services. Advanced medical devices and equipment originally designed for use by trained personnel in hospitals and clinics are increasingly migrating into the home. Unlike the clinical setting, the home is an uncontrolled environment with additional hazards. The compatibility of the device with the recipient's knowledge, abilities, lifestyle, and home environment plays a significant role in their therapy and rehabilitation. The advent of new device technologies such as wireless devices and interoperability of systems lends a new and complex perspective for medical device use in the home that must also be addressed. Adequately assessing and matching the patient and their caregiver with the appropriate device technology while considering the suitability of the home environment for device operation and maintenance is a challenge that relies on good human factors principles. There is a need to address these challenges in the growing home care sector In this article, the authors take a look at some important considerations and design issues for medical devices used in the home care environment.
Thoresen, Carl J; Bradley, Jill C; Bliese, Paul D; Thoresen, Joseph D
2004-10-01
This study extends the literature on personality and job performance through the use of random coefficient modeling to test the validity of the Big Five personality traits in predicting overall sales performance and sales performance trajectories--or systematic patterns of performance growth--in 2 samples of pharmaceutical sales representatives at maintenance and transitional job stages (K. R. Murphy, 1989). In the maintenance sample, conscientiousness and extraversion were positively associated with between-person differences in total sales, whereas only conscientiousness predicted performance growth. In the transitional sample, agreeableness and openness to experience predicted overall performance differences and performance trends. All effects remained significant with job tenure statistically controlled. Possible explanations for these findings are offered, and theoretical and practical implications of findings are discussed. (c) 2004 APA, all rights reserved
DOT National Transportation Integrated Search
2008-08-11
It will be advantageous to have information on the state of health of infrastructure at all times in : order to carry out effective on-demand maintenance. With the tremendous advancement in technology, it is : possible to employ devices embedded in s...
49 CFR 236.507 - Brake application; full service.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.507 Brake application; full service. The automatic train stop or train control apparatus shall, when operated, cause a full service...
49 CFR 236.507 - Brake application; full service.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.507 Brake application; full service. The automatic train stop or train control apparatus shall, when operated, cause a full service...
49 CFR 236.808 - Signals, opposing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Signals, opposing. 236.808 Section 236.808..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.808 Signals, opposing. Roadway signals which govern movements in opposite directions on the same track. ...
49 CFR 236.807 - Signal, interlocking.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Signal, interlocking. 236.807 Section 236.807..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.807 Signal, interlocking. A roadway signal which governs movements into or within interlocking limits. ...
49 CFR 236.808 - Signals, opposing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Signals, opposing. 236.808 Section 236.808..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.808 Signals, opposing. Roadway signals which govern movements in opposite directions on the same track. ...
49 CFR 236.807 - Signal, interlocking.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Signal, interlocking. 236.807 Section 236.807..., MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.807 Signal, interlocking. A roadway signal which governs movements into or within interlocking limits. ...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2014 CFR
2014-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2012 CFR
2012-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.
Code of Federal Regulations, 2013 CFR
2013-10-01
... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...
49 CFR 232.605 - Training requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION BRAKE SYSTEM SAFETY STANDARDS FOR FREIGHT AND OTHER NON-PASSENGER TRAINS AND EQUIPMENT; END-OF-TRAIN DEVICES Electronically Controlled Pneumatic (ECP) Braking Systems § 232.605 Training... equipped with an ECP brake system and each contractor that performs inspection, testing, or maintenance on...
40 CFR 98.124 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... efficiency test provided that the design, operation, or maintenance of the destruction device has not changed... the last emissions test), you must repeat the emission characterization. Perform the emission... process vent, previous test results, provided the tests are representative of current operating conditions...
40 CFR 98.124 - Monitoring and QA/QC requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... efficiency test provided that the design, operation, or maintenance of the destruction device has not changed... the last emissions test), you must repeat the emission characterization. Perform the emission... process vent, previous test results, provided the tests are representative of current operating conditions...
30 CFR 56.14132 - Horns and backup alarms.
Code of Federal Regulations, 2011 CFR
2011-07-01
....14132 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14132 Horns and backup alarms. (a) Manually...
30 CFR 56.14132 - Horns and backup alarms.
Code of Federal Regulations, 2010 CFR
2010-07-01
....14132 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Machinery and Equipment Safety Devices and Maintenance Requirements § 56.14132 Horns and backup alarms. (a) Manually...