Rapidly expanding mobile apps for crowd-sourcing bike data to new cities : final report.
DOT National Transportation Integrated Search
2017-03-01
Cities such as San Francisco, Atlanta, and Portland are using novel methods of data collection to learn more about the use of their bicycle : infrastructure. These data can help transportation planners better design or upgrade bicycle facilities. San...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
When the facilities design and construction team at the University of California, San Diego (UCSD) started planning to upgrade and expand their control system, they had several critical goals for the project. They wanted a building automation system (BAS) that could achieve optimum energy savings while maximizing the efficiency of the facilities staff. They needed the new system to link 26 campus buildings--containing a variety of existing systems--to one central location for monitoring and diagnostics. They wanted a single vendor to handle installation, software development, service and support--and they wanted the entire project completed without downtime. At the core ofmore » these technologies is the Metasys{reg_sign} facility management system from Johnson Controls.« less
Stone, Christopher M.; Williams, Derrick C.; Price, Jeremy P.
2016-09-23
The Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the Spallation Neutron Source (SNS), Oak Ridge, Tennessee, incorporates a 69m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimize opportunity for operational error. This upgrade provided the following practical contributions: Reduced time required to evacuate from atmospheric pressure to 2mTorr from 500-1,000 minutes to 60-70 minutes Provided turn-key automated control with a multi-faceted interlock for personnel and machine safety.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Christopher M.; Williams, Derrick C.; Price, Jeremy P.
The Extended Q-Range Small-Angle Neutron Scattering Diffractometer (EQ-SANS) instrument at the Spallation Neutron Source (SNS), Oak Ridge, Tennessee, incorporates a 69m3 detector vessel with a vacuum system which required an upgrade with respect to performance, ease of operation, and maintenance. The upgrade focused on improving pumping performance as well as optimizing system design to minimize opportunity for operational error. This upgrade provided the following practical contributions: Reduced time required to evacuate from atmospheric pressure to 2mTorr from 500-1,000 minutes to 60-70 minutes Provided turn-key automated control with a multi-faceted interlock for personnel and machine safety.
Colorado River Sewer System Joint Venture to Upgrade Wastewater System
SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap
1988-06-01
upgrading of the depot’s FPI inspection facility, In the forme- case, a realistic projection based while augmenting it with enhanced inspection systems...number of models, powers the twin engined F-15 and the single engined F-16 fighter aircraft. It is an augmented turbofan engine in the 25,000 pound...move from an idea in 1972 to reality today for military gas turbine engines. Special acknowledgement is accorded to the Materials Laboratory of the Air
28 CFR 115.218 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...
28 CFR 115.218 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...
28 CFR 115.218 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...
RETRAINING OF THE UNDERPRIVILEGED, THE NEIGHBORHOOD HOUSE STORY.
ERIC Educational Resources Information Center
HOOS, IDA R.
AN ACCOUNT OF JOB UPGRADING AT NEIGHBORHOOD HOUSE, NORTH RICHMOND, CALIFORNIA, DOCUMENTS THE LARGELY INADEQUATE EDUCATION AND SEVERE EMPLOYMENT DIFFICULTIES OF NEGROES IN THE GREATER SAN FRANCISCO AREA, DESCRIBES TRAINEE CHARACTERISTICS AND PROBLEMS, DESIRED UPGRADING EXPERIENCES, LIAISON WITH THE STATE EMPLOYMENT SERVICE, COOPERATION WITH THE…
PG&E's Seismic Network Goes Digital With Strong Motion: Successes and Challenges
NASA Astrophysics Data System (ADS)
Stanton, M. A.; Cullen, J.; McLaren, M. K.
2008-12-01
Pacific Gas and Electric Company (PG&E) is in year 3 of a 5-year project to upgrade the Central Coast Seismic Network (CCSN) from analog to digital. Located along the south-central California coast, the CCSN began operation in 1987, with 20 analog stations; 15 vertical component and 5 dual gain 3-component S-13 sensors. The analog signals travel over FM radio telemetry links and voice channels via PG&E's microwave network to our facility in San Francisco (SF), where the A/D conversion is performed on a computer running Earthworm v7.1, which also transmits the data to the USGS in Menlo Park. At the conversion point the dynamic ranges of the vertical and dual-gain sensors are 40-50dB and 60-70dB, respectively. Dynamic range exceedance (data clipping) generally occurs for a M2.5 or greater event within about 40 km of a station. The motivations to upgrade the seismic network were the need for higher dynamic range and to retire obsolete analog transmission equipment. The upgraded digital stations consist of the existing velocity sensors, a 131A-02/3 accelerometer and a Reftek 130-01 Broadband Seismic Recorder for digital data recording and transmission to SF. Vertical only stations have one component of velocity and 3 components of acceleration. Dual gain sites have 3 components of velocity and 3 of acceleration. To date we have successfully upgraded 6 sites; 3 more will be installed by the end of 2008. Some of the advantages of going digital are 1) data is recorded at each site and in SF, 2) substantially increased dynamic range of the velocity sensors to 120dB, as observed by on scale, close-by recordings from a M3.9 San Simeon aftershock on 04/29/2008, 3) accelerometers for on scale recording of large earthquakes, and 4) ability to contribute our strong motion data to USGS ShakeMaps. A significant challenge has been consistent radio communications. To resolve this issue we are installing point-to-multipoint Motorola Canopy spread spectrum radios at the stations and communication towers.
Recent Developments at the NASA Langley Research Center National Transonic Facility
NASA Technical Reports Server (NTRS)
Paryz, Roman W.
2011-01-01
Several upgrade projects have been completed or are just getting started at the NASA Langley Research Center National Transonic Facility. These projects include a new high capacity semi-span balance, model dynamics damping system, semi-span model check load stand, data acquisition system upgrade, facility automation system upgrade and a facility reliability assessment. This presentation will give a brief synopsis of each of these efforts.
Facilities Upgrade and Retrofit. Strategies for Success.
ERIC Educational Resources Information Center
Kennedy, Mike
2000-01-01
Provides three articles on the subject of educational facility upgrading and retrofiting that address setting guidelines for classroom acoustics, making sports facilities brighter and more energy-efficient, and cutting energy bills and protecting interiors. (GR)
Upgrade of U.S. EPA's Experimental Stream Facility Supervisory Control and Data Acquisition System
The Supervisory control and data acquisition (SCADA) system for the U.S. EPA’s Experimental Stream Facility (ESF) was upgraded using Camile hardware and software in 2015. The upgrade added additional hardwired connections, new wireless capabilities, and included a complete rewrit...
28 CFR 115.318 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies... facilities and technologies. (a) When designing or acquiring any new facility and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...
28 CFR 115.318 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies... facilities and technologies. (a) When designing or acquiring any new facility and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...
28 CFR 115.318 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies... facilities and technologies. (a) When designing or acquiring any new facility and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...
Beans, Bruce E
2017-05-01
The new USP standard for handling hazardous drugs (HDs) will require millions of dollars in capital outlays for facility and equipment upgrades and also requires in-depth assessments of each HD that facilities handle, significant workflow and work practice changes, and thorough staff training.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stickney, R.G.
This report presents the results of a systematic evaluation conducted to identify miscellaneous TWRS facilities, tanks and components with potential needed authorization basis upgrades. It provides the Authorization Basis upgrade plan for those miscellaneous TWRS facilities, tanks and components identified.
Recovery Act. Tapoco project. Cheoah upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tran, Paul
2013-10-02
Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.
The Nova Upgrade Facility for ICF ignition and gain
NASA Astrophysics Data System (ADS)
Lowdermilk, W. H.; Campbell, E. M.; Hunt, J. T.; Murray, J. R.; Storm, E.; Tobin, M. T.; Trenholme, J. B.
1992-01-01
Research on Inertial Confinement Fusion (ICF) is motivated by its potential defense and civilian applications, including ultimately the generation of electric power. The U.S. ICF Program was reviewed recently by the National Academy of Science (NAS) and the Fusion Policy Advisory Committee (FPAC). Both committees issued final reports in 1991 which recommended that first priority in the ICF program be placed on demonstrating fusion ignition and modest gain (G less than 10). The U.S. Department of Energy and Lawrence Livermore National Laboratory (LLNL) have proposed an upgrade of the existing Nova Laser Facility at LLNL to accomplish these goals. Both the NAS and FPAC have endorsed the upgrade of Nova as the optimal path to achieving ignition and gain. Results from Nova Upgrade Experiments will be used to define requirements for driver and target technology both for future high-yield military applications, such as the Laboratory Microfusion Facility (LMF) proposed by the Department of Energy, and for high-gain energy applications leading to an ICF engineering test facility. The central role and modifications which Nova Upgrade would play in the national ICF strategy are described.
Experiment Needs and Facilities Study Appendix A Transient Reactor Test Facility (TREAT) Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The TREAT Upgrade effort is designed to provide significant new capabilities to satisfy experiment requirements associated with key LMFBR Safety Issues. The upgrade consists of reactor-core modifications to supply the physics performance needed for the new experiments, an Advanced TREAT loop with size and thermal-hydraulics capabilities needed for the experiments, associated interface equipment for loop operations and handling, and facility modifications necessary to accommodate operations with the Loop. The costs and schedules of the tasks to be accomplished under the TREAT Upgrade project are summarized. Cost, including contingency, is about 10 million dollars (1976 dollars). A schedule for execution ofmore » 36 months has been established to provide the new capabilities in order to provide timely support of the LMFBR national effort. A key requirement for the facility modifications is that the reactor availability will not be interrupted for more than 12 weeks during the upgrade. The Advanced TREAT loop is the prototype for the STF small-bundle package loop. Modified TREAT fuel elements contain segments of graphite-matrix fuel with graded uranium loadings similar to those of STF. In addition, the TREAT upgrade provides for use of STF-like stainless steel-UO{sub 2} TREAT fuel for tests of fully enriched fuel bundles. This report will introduce the Upgrade study by presenting a brief description of the scope, performance capability, safety considerations, cost schedule, and development requirements. This work is followed by a "Design Description". Because greatly upgraded loop performance is central to the upgrade, a description is given of Advanced TREAT loop requirements prior to description of the loop concept. Performance requirements of the upgraded reactor system are given. An extensive discussion of the reactor physics calculations performed for the Upgrade concept study is provided. Adequate physics performance is essential for performance of experiments with the Advanced TREAT loop, and the stress placed on these calculations reflects this. Additional material on performance and safety is provided. Backup calculations on calculations of plutonium-release limits are described. Cost and schedule information for the Upgrade are presented.« less
Recent Upgrades at the Fermilab Test Beam Facility
NASA Astrophysics Data System (ADS)
Rominsky, Mandy
2016-03-01
The Fermilab Test Beam Facility is a world class facility for testing and characterizing particle detectors. The facility has been in operation since 2005 and has undergone significant upgrades in the last two years. A second beam line with cryogenic support has been added and the facility has adopted the MIDAS data acquisition system. The facility also recently added a cosmic telescope test stand and improved tracking capabilities. With two operational beam lines, the facility can deliver a variety of particle types and momenta ranging from 120 GeV protons in the primary beam line down to 200 MeV particles in the tertiary beam line. In addition, recent work has focused on analyzing the beam structure to provide users with information on the data they are collecting. With these improvements, the Fermilab Test Beam facility is capable of supporting High Energy physics applications as well as industry users. The upgrades will be discussed along with plans for future improvements.
14. FACILITY IDENTIFICATION STENCILED ON ROOF BEAM, 'RIGGING LOFT' PORTION ...
14. FACILITY IDENTIFICATION STENCILED ON ROOF BEAM, 'RIGGING LOFT' PORTION OF BUILDING 4. - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA
Upgrades at the NASA Langley Research Center National Transonic Facility
NASA Technical Reports Server (NTRS)
Paryz, Roman W.
2012-01-01
Several projects have been completed or are nearing completion at the NASA Langley Research Center (LaRC) National Transonic Facility (NTF). The addition of a Model Flow-Control/Propulsion Simulation test capability to the NTF provides a unique, transonic, high-Reynolds number test capability that is well suited for research in propulsion airframe integration studies, circulation control high-lift concepts, powered lift, and cruise separation flow control. A 1992 vintage Facility Automation System (FAS) that performs the control functions for tunnel pressure, temperature, Mach number, model position, safety interlock and supervisory controls was replaced using current, commercially available components. This FAS upgrade also involved a design study for the replacement of the facility Mach measurement system and the development of a software-based simulation model of NTF processes and control systems. The FAS upgrades were validated by a post upgrade verification wind tunnel test. The data acquisition system (DAS) upgrade project involves the design, purchase, build, integration, installation and verification of a new DAS by replacing several early 1990's vintage computer systems with state of the art hardware/software. This paper provides an update on the progress made in these efforts. See reference 1.
The Science and Experimental Equipment for the 12 GeV Upgrade of CEBAF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arrington, John; Bernstein, Aron; Brooks, William
2005-01-10
This Conceptual Design Report (CDR) presents the compelling scientific case for upgrading the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab to 12 GeV. Such a facility will make profound contributions to the study of hadronic matter.
2000-03-01
discussed. There are two requirements of the permit designed to meet the goals of the program: 1) design and implementation of BMPs to control runoff...affect these species. NMFS is aware that specific upgrades to the sanitary sewer and storm drainage systems have yet to be designed and the proposed...Specific 8 upgrades to the sanitary sewer and storm drainage systems, though not yet designed , 9 will meet both City and County of San Francisco and
28 CFR 115.118 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies... and technologies. (a) When designing or acquiring any new lockup and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...
28 CFR 115.118 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies... and technologies. (a) When designing or acquiring any new lockup and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...
28 CFR 115.118 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies... and technologies. (a) When designing or acquiring any new lockup and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...
ERIC Educational Resources Information Center
Ling, A. Campbell
1979-01-01
The following aspects of the radiochemistry program at San Jose State University in California are described: the undergraduate program in radiation chemistry, the new nuclear science facility, and academic programs in nuclear science for students not attending San Jose State University. (BT)
Earthquake effects at nuclear reactor facilities: San Fernando earthquake of February 9th, 1971
DOE Office of Scientific and Technical Information (OSTI.GOV)
Howard, G.; Ibanez, P.; Matthiesen, F.
1972-02-01
The effects of the San Fernando earthquake of February 9, 1971 on 26 reactor facilities located in California, Arizona, and Nevada are reported. The safety performance of the facilities during the earthquake is discussed. (JWR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Field, K. G.; Wetteland, C. J.; Cao, G.
2013-04-19
The University of Wisconsin Ion Beam Laboratory (UW-IBL) has recently undergone significant infrastructure upgrades to facilitate graduate level research in irradiated materials phenomena and ion beam analysis. A National Electrostatics Corp. (NEC) Torodial Volume Ion Source (TORVIS), the keystone upgrade for the facility, can produce currents of hydrogen ions and helium ions up to {approx}200 {mu}A and {approx}5 {mu}A, respectively. Recent upgrades also include RBS analysis packages, end station developments for irradiation of relevant material systems, and the development of an in-house touch screen based graphical user interface for ion beam monitoring. Key research facilitated by these upgrades includes irradiationmore » of nuclear fuels, studies of interfacial phenomena under irradiation, and clustering dynamics of irradiated oxide dispersion strengthened steels. The UW-IBL has also partnered with the Advanced Test Reactor National Scientific User Facility (ATR-NSUF) to provide access to the irradiation facilities housed at the UW-IBL as well as access to post irradiation facilities housed at the UW Characterization Laboratory for Irradiated Materials (CLIM) and other ATR-NSUF partner facilities. Partnering allows for rapid turnaround from proposed research to finalized results through the ATR-NSUF rapid turnaround proposal system. An overview of the UW-IBL including CLIM and relevant research is summarized.« less
Corrections for the geometric distortion of the tube detectors on SANS instruments at ORNL
He, Lilin; Do, Changwoo; Qian, Shuo; ...
2014-11-25
Small-angle neutron scattering instruments at the Oak Ridge National Laboratory's High Flux Isotope Reactor were upgraded in area detectors from the large, single volume crossed-wire detectors originally installed to staggered arrays of linear position-sensitive detectors (LPSDs). The specific geometry of the LPSD array requires that approaches to data reduction traditionally employed be modified. Here, two methods for correcting the geometric distortion produced by the LPSD array are presented and compared. The first method applies a correction derived from a detector sensitivity measurement performed using the same configuration as the samples are measured. In the second method, a solid angle correctionmore » is derived that can be applied to data collected in any instrument configuration during the data reduction process in conjunction with a detector sensitivity measurement collected at a sufficiently long camera length where the geometric distortions are negligible. Furthermore, both methods produce consistent results and yield a maximum deviation of corrected data from isotropic scattering samples of less than 5% for scattering angles up to a maximum of 35°. The results are broadly applicable to any SANS instrument employing LPSD array detectors, which will be increasingly common as instruments having higher incident flux are constructed at various neutron scattering facilities around the world.« less
Barriers to enrolment into a professional upgrading programme for enrolled nurses in Kenya
Lakati, Alice; Ngatia, Peter; Mbindyo, Caroline; Mukami, Diana; Oywer, Elizabeth
2012-01-01
Introduction Nurses play a key role in the provision of health care. Over 70% of the nurses in Kenya are Enrolled Community Health Nurses (ECHNs). AMREF in partnership with Nursing Council of Kenya and the Ministry of Health pioneered an eLearning Nurse Upgrading Programme. The purpose of this study was to identify barriers that hindered enrolment into the programme. Methods A descriptive cross-sectional design was used. A sample of 532 ECHNs was interviewed from four provinces. Data was collected using a pre-tested self administered questionnaire. Analysis was done using SPSS computer software. Descriptive statistics were calculated for all variables and chi-square tests used to determine variables that were associated with enrolment. Mann Whitney U-test was used for continuous variables. Results A third (29.7%) of the nurses were from Rift Valley province and 17.9% from Coast. Majority (75%) were from public health facilities. The mean age of the nurses was 40.6 years. The average monthly income was KES 22,497.68 (USD 294). Awareness of the upgrading programme was high (97%) among the nurses. The cost of fees was the main (74.1%) barrier to enrolment in all the provinces and across all the health facilities. The type of health facility was significantly (p < 0.05) associated with enrolment. Nurses from faith-based health facilities were less likely to have enrolled. Conclusion Awareness of the upgrading programme is high. The cost of upgrading programme, age and working in a faith-based health facility are the main barriers to enrolment. Intervention that fund nurses to upgrade would increase nurse enrolment. PMID:23467717
High Speed Operation and Testing of a Fault Tolerant Magnetic Bearing
NASA Technical Reports Server (NTRS)
DeWitt, Kenneth; Clark, Daniel
2004-01-01
Research activities undertaken to upgrade the fault-tolerant facility, continue testing high-speed fault-tolerant operation, and assist in the commission of the high temperature (1000 degrees F) thrust magnetic bearing as described. The fault-tolerant magnetic bearing test facility was upgraded to operate to 40,000 RPM. The necessary upgrades included new state-of-the art position sensors with high frequency modulation and new power edge filtering of amplifier outputs. A comparison study of the new sensors and the previous system was done as well as a noise assessment of the sensor-to-controller signals. Also a comparison study of power edge filtering for amplifier-to-actuator signals was done; this information is valuable for all position sensing and motor actuation applications. After these facility upgrades were completed, the rig is believed to have capabilities for 40,000 RPM operation, though this has yet to be demonstrated. Other upgrades included verification and upgrading of safety shielding, and upgrading control algorithms. The rig will now also be used to demonstrate motoring capabilities and control algorithms are in the process of being created. Recently an extreme temperature thrust magnetic bearing was designed from the ground up. The thrust bearing was designed to fit within the existing high temperature facility. The retrofit began near the end of the summer, 04, and continues currently. Contract staff authored a NASA-TM entitled "An Overview of Magnetic Bearing Technology for Gas Turbine Engines", containing a compilation of bearing data as it pertains to operation in the regime of the gas turbine engine and a presentation of how magnetic bearings can become a viable candidate for use in future engine technology.
NASA Glenn PSL-3 and 4 Control System Upgrade
NASA Technical Reports Server (NTRS)
Lizanich, Paul J.
2010-01-01
An overview of the PSL-3&4 Jet Engine Test Facility control system; including its history, a description of the present effort to upgrade from Emerson Ovation v2.2 to V3.3.1, and future upgrade plans is shown.
Technical Report from Grant Recipient - City of Redlands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giorgianni, Kathleen Margaret
2016-05-26
The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).
Oltmann, Richard N.
1999-01-01
During the spring of years when the flow of the San Joaquin River is less than 7,000 cubic feet per second (ft3/s) a temporary rock barrier is installed by the California Department of Water Resources (DWR) at the head of Old River (HOR) in the south Sacramento-San Joaquin Delta to prevent out migrating salmon in the San Joaquin River from entering Old River and being drawn to the State and federal pumping facilities (Figure 1). The export rate of the pumping facilities also is reduced during these migration periods to minimize the draw of fish to the export facilities through the other channels connected to the San Joaquin River north of the HOR such as Turner Cut, Columbia Cut, and Middle River.
NASA Astrophysics Data System (ADS)
Perin, A.; Dhalla, F.; Gayet, P.; Serio, L.
2017-12-01
SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.
Cryogenic testing of Planck sorption cooler test facility
NASA Technical Reports Server (NTRS)
Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.
2004-01-01
A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.
78 FR 35593 - Special Local Regulation; Christmas Boat Parade, San Juan Harbor; San Juan, PR
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-13
...: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room... Coast Guard when it is received at the Docket Management Facility. We recommend that you include your... the line associated with this rulemaking. You may also visit the Docket Management Facility in Room...
Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meador, Richard J.; Hatley, Darrel D.
2004-03-18
Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less
RETRAINING BY PRIVATE INDUSTRY.
ERIC Educational Resources Information Center
HOOS, IDA R.
SEVERAL SAN FRANCISCO BAY AREA COMPANIES WERE EXAMINED FOR SPECIFIC PROGRAMS FOR DISPLACED EMPLOYEES. ARMOUR AND COMPANY SOUGHT TO GUIDE DISPLACED EMPLOYEES TO CLASSES OR COURSES OF ACTION OUTSIDE ITS OWN SPHERE OF OPERATION. LOCKHEED HAS PROVIDED UNUSUALLY WELL FOR UPGRADING AND RETRAINING, MAINLY BECAUSE OF INDUSTRY FLUCTUATIONS AND RAPID…
UNION-SPONSORED RETRAINING PROGRAMS.
ERIC Educational Resources Information Center
HOOS, IDA R.
UNION-SPONSORED TRAINING PROGRAMS WERE PROVIDED IN THE SAN FRANCISCO BAY AREA TO UPGRADE SKILLS OF MARINE COOKS AND STEWARDS, SHIPS' RADIO OPERATORS, JOURNEYMAN PLUMBERS AND GASFITTERS, AND MEMBERS OF THE INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS (IBEW). THESE PROGRAMS WERE THE ONLY COHESIVE UNION SPONSORED CURRICULA IN THAT AREA. MAJOR…
Energy Efficiency in Water and Wastewater Facilities
Learn how local governments have achieved sustained energy improvements at their water and wastewater facilities through equipment upgrades, operational modifications, and modifications to facility buildings.
Central California Action Associates, Inc.
ERIC Educational Resources Information Center
Sortor, Maia, Comp.
The overall goal of the Central California Action Associates Inc. (CCAA) program is to provide basic education and pre-vocational training so that migrant and seasonal adult farm workers will be able to upgrade their economic and social lives. Without increased educational attainment, the San Joaquin Valley farm workers face a grim future because…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
...: Medina Facility. Location: San Antonio, Texas. Job Titles and/or Job Duties: Workers potentially exposed... Compensation Analysis and Support, National Institute for Occupational Safety and Health, 4676 Columbia Parkway...
NASA Astrophysics Data System (ADS)
Belov, I. A.; Bel'kov, S. A.; Voronich, I. N.; Garanin, S. G.; Derkach, V. N.; Koshechkin, S. V.; Lysov, M. I.; Markov, S. S.; Savkin, S. V.
2016-09-01
The amplifier elements upgrade at the “Luch” laser facility was carried out. Measurements showed that the upgrade of the amplifier elements resulted in the amplifier's small signal gain coefficient K0 increase from 12.9% to 14.3% depending on the capacitor charging voltage; the linear gain coefficient increase was about g0 ≈ (6-8)%. Full-scale laser experiments at the facility showed the power amplifier gain coefficient increase consistent with active medium gain coefficient measurement results.
Thermal Vacuum Control Systems Options for Test Facilities
NASA Technical Reports Server (NTRS)
Marchetti, John
2008-01-01
This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.
Upgrades at the Duke Free Electron Laser Laboratory
NASA Astrophysics Data System (ADS)
Howell, Calvin R.
2004-11-01
Major upgrades to the storage-ring based photon sources at the Duke Free Electron Laser Laboratory (DFELL) are underway. The photon sources at the DFELL are well suited for research in the areas of medicine, biophysics, accelerator physics, nuclear physics and material science. These upgrades, which will be completed by the summer 2006, will significantly enhance the capabilities of the ultraviolet (UV) free-electron laser (FEL) and the high intensity gamma-ray source (HIGS). The HIGS is a relatively new research facility at the DFELL that is operated jointly by the DFELL and the Triangle Universities Nuclear Laboratory. The gamma-ray beam is produced by Compton back scattering of the UV photons inside the FEL optical cavity off the circulating electrons in the storage ring. The gamma-ray beam is 100% polarized and its energy resolution is selected by collimation. The capabilities of the upgraded facility will be described, the status of the upgrades will be summarized, and the proposed first-generation research program at HIGS will be presented.
Thermal System Upgrade of the Space Environment Simulation Test Chamber
NASA Technical Reports Server (NTRS)
Desai, Ashok B.
1997-01-01
The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.
NASA Astrophysics Data System (ADS)
Mahavarkar, Prasanna; John, Jacob; Dhapre, Vijay; Dongre, Varun; Labde, Sachin
2018-04-01
A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia), was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG) in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goodman, Dan
The goal of this project is to upgrade existing building facilities owned by Nunamiut Corporation in Anaktuvuk Pass, AK. The upgrades mentioned will include lighting, heating system, insulation and smart control units designed to increase the energy efficiency of Village Corporation owned buildings.
1998-11-16
This notice is to advise interested parties that Brooke Army Medical Center (BAMC) and Wilford Hall Medical Center (WHMC), hereinafter referred to as Destination San Antonio, have been designated the Regional Specialized Treatment Service facilities (STSFs) for DRGs 1, 3, 4, 49, 104-107, 110-111, 191, 209, 491, 286, and 357. The application for the STSF designation was submitted by the Lead Agency for TRICARE Region 6 and approved by the Assistant Secretary of Defense (Health Affairs). The Lead Agent will oversee that the STSFs maintain the quality and standards required for specialized treatment services. DoD beneficiaries residing within a 200-mile radius of Destination San Antonio facilities falling into the above patient category must be evaluated by Destination San Antonio staff before receiving care for these DRGs under direct military care or TRICARE/CHAMPUS cost sharing. Travel and lodging for the patient and, if stated to be medically necessary by a referring physician, for a nonmedical attendant, will be reimbursed by Destination San Antonio facility in accordance with the provisions of the Joint Federal Travel Regulation. Although evaluation in person is preferred, it is possible to conduct the evaluation telephonically if the patient is unable to travel to a Destination San Antonio facility. If the care for these DRGs cannot be performed at the Destination San Antonio facilities, the TRICARE Managed Care Support Contractor for Region 6 will provide a medical necessity review prior to issuance of an Inpatient Care Authorization or Non-availability Statement.
Fuel Flexible Gas Turbine Combustor Flametube Facility Upgraded
NASA Technical Reports Server (NTRS)
Little, James E.; Nemets, Steve A.; Tornabene, Robert T.; Smith, Timothy D.; Frankenfeld, Bruce J.
2004-01-01
In fiscal year 2003, test cell 23 of the Research Combustion Laboratory (RCL 23) at the NASA Glenn Research Center was upgraded with the addition of gaseous hydrogen as a working propellant and the addition of a 450-psig air-supply system. Test flexibility was further enhanced by upgrades to the facility control systems. RCL 23 can now test with gaseous hydrogen flow rates up to 0.05 lbm/sec and jet fuel flow rates up to 0.62 lbm/sec. Research airflow rates up to 3 lbm/sec are possible with the 450-psig supply system over a range of inlet temperatures. Nonvitiated, heated air is supplied from a shell and tube heat exchanger. The maximum nonvitiated facility air temperature is 1100 F at 1.5 lbm/sec. Research-section exhaust temperatures are limited to 3200 F because of material and cooling capacity limits. A variety of support systems are available depending on the research hardware configuration. Test section ignition can be provided via either a hydrogen air torch system or an electronic spark system. Emissions measurements are obtained with either pneumatically or electromechanically actuated gas sample probes, and the electromechanical system allows for radial measurements at a user-specified axial location for measurement of emissions profiles. Gas analysis data can be obtained for a variety of species, including carbon monoxide (CO), carbon dioxide (CO2), nitrogen oxides (NO and NOx), oxygen (O2), unburnt hydrocarbons, and unburnt hydrogen. Facility control is accomplished with a programmable logic control system. Facility operations have been upgraded to a system based on graphical user interface control screens. A data system is available for real-time acquisition and monitoring of both measurements in engineering units and performance calculations. The upgrades have made RCL 23 a highly flexible facility for research into low emissions gas turbine combustor concepts, and the flame tube configuration inherently allows for a variety of fuel nozzle configurations to be tested in a cost-effective manner. RCL 23 is poised to be a leading facility for developing modern low-emission fuel nozzles for use with jet fuel and alternative fuels.
9. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: PLANS, SECTIONS, ...
9. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: PLANS, SECTIONS, AND DETAILS, JANUARY 1993. - Cape Canaveral Air Station, Launch Complex 17, Facility 28425, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
8. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: ELEVATIONS AND ...
8. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: ELEVATIONS AND BUILDING SECTION, JULY 1992. - Cape Canaveral Air Station, Launch Complex 17, Facility 28425, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL
The Deep Space Network: An instrument for radio astronomy research
NASA Technical Reports Server (NTRS)
Renzetti, N. A.; Levy, G. S.; Kuiper, T. B. H.; Walken, P. R.; Chandlee, R. C.
1988-01-01
The NASA Deep Space Network operates and maintains the Earth-based two-way communications link for unmanned spacecraft exploring the solar system. It is NASA's policy to also make the Network's facilities available for radio astronomy observations. The Network's microwave communication systems and facilities are being continually upgraded. This revised document, first published in 1982, describes the Network's current radio astronomy capabilities and future capabilities that will be made available by the ongoing Network upgrade. The Bibliography, which includes published papers and articles resulting from radio astronomy observations conducted with Network facilities, has been updated to include papers to May 1987.
Retrofit California Overview and Final Reports
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choy, Howard; Rosales, Ana
Energy efficiency retrofits (also called upgrades) are widely recognized as a critical component to achieving energy savings in the building sector to help lower greenhouse gas (GHG) emissions. To date, however, upgrades have accounted for only a small percentage of aggregate energy savings in building stock, both in California and nationally. Although the measures and technologies to retrofit a building to become energy efficient are readily deployed, establishing this model as a standard practice remains elusive. Retrofit California sought to develop and test new program models to increase participation in the energy upgrade market in California. The Program encompassed 24more » pilot projects, conducted between 2010 and mid-2013 and funded through a $30 million American Recovery and Reinvestment Act (ARRA) grant from the U.S. Department of Energy’s (DOE) Better Buildings Neighborhood Program (BBNP). The broad scope of the Program can be seen in the involvement of the following regionally based Grant Partners: Los Angeles County (as prime grantee); Association of Bay Area Governments (ABAG), consisting of: o StopWaste.org for Alameda County o Regional Climate Protection Authority (RCPA) for Sonoma County o SF Environment for the City and County of San Francisco o City of San Jose; California Center for Sustainable Energy (CCSE) for the San Diego region; Sacramento Municipal Utilities District (SMUD). Within these jurisdictions, nine different types of pilots were tested with the common goal of identifying, informing, and educating the people most likely to undertake energy upgrades (both homeowners and contractors), and to provide them with incentives and resources to facilitate the process. Despite its limited duration, Retrofit California undoubtedly succeeded in increasing awareness and education among home and property owners, as well as contractors, realtors, and community leaders. However, program results indicate that a longer timeframe will be needed to transform the market and establish energy retrofits as the new paradigm. Innovations such as Flex Path, which came about because of barriers encountered during the Program, have already shown promise and are enabling increased participation. Together, the pilots represent an unprecedented effort to identify and address market barriers to energy efficiency upgrades and to provide lessons learned to shape future program planning and implementation. The statistics reflects the scope of the marketing and outreach campaigns, which tested a variety of approaches to increase understanding of the benefits of energy upgrades to drive participation in the Program. More traditional methods such as TV and radio advertisements were complimented by innovative community based social marketing campaigns that sought to leverage the trusted status of neighborhood organizations and leaders in order to motivate their constituents to undertake retrofits. The remainder of this report provides an overview of Retrofit California including brief summaries of the pilots’ main components and highlights, followed by the major findings or takeaway lessons from the approaches that were tested. Eleven of the pilots will be continued, with modifications, under the ratepayer-funded Regional Energy Networks. Involvement in the RENS by many of the Retrofit California partners will ensure that early lessons learned are carried forward to guide future programs for energy upgrades in California.« less
NREL, San Diego Gas & Electric Are Advancing Utility Microgrid Performance
in Borrego Springs, California | Energy Systems Integration Facility | NREL NREL, San Diego Gas & Electric Models Utility Microgrid in Borrego Springs NREL, San Diego Gas & Electric Are Advancing Utility Microgrid Performance in Borrego Springs, California San Diego Gas & Electric Company
Upgrade of the cryogenic CERN RF test facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pirotte, O.; Benda, V.; Brunner, O.
2014-01-29
With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RFmore » test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.« less
The SANS facility at the Pitesti 14MW TRIGA reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ionita, I.; Grabcev, B.; Todireanu, S.
2006-12-15
The SANS facility existing at the Pitesti 14MW TRIGA reactor is presented. The main characteristics and the preliminary evaluation of the installation performances are given. A monochromatic neutron beam with 1.5 A {<=} {lambda} {<=} 5 A is produced by a mechanical velocity selector with helical slots. A fruitful partnership was established between INR Pitesti (Romania) and JINR Dubna (Russia). The first step in this cooperation consists in the manufacturing in Dubna of a battery of gas-filled positional detectors devoted to the SANS instrument.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy
2009-10-07
The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under theirmore » control. This regulatory development has been accomplished as part of the U.S.-Russian MPC&A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC&A regulations.« less
Developing the Muon Facilities at ISIS
NASA Astrophysics Data System (ADS)
Hillier, A. D.; Aramini, M.; Baker, P. J.; Berlie, A.; Biswas, P. K.; Cottrell, S. P.; Ishida, K.; Loe, T.; Lord, J. S.; Pooley, D. E.; Pratt, F. L.; Rhodes, N. J.; da Silva Afonso, R. J.; Telling, M. T. F.; Yokoyama, K.
For the last 30 years, muon experiments at ISIS have been making a significant contribution to a number of scientific fields. However, as a community of researchers, we are always aiming to improve and extend the instruments' capabilities. In this paper, we will review key developments at the ISIS muon facility, the primary beamline upgrade and recent technique developments, before taking a forward look to new projects, such as: the upgrade for MuSR, e-learning, detector development and sample environment.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-26
... decommission the Ocotillo Sol Solar Project, a solar photovoltaic (PV) power plant facility, on approximately... Applicant's Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... project, a solar photovoltaic (PV) power plant facility, on approximately 115 acres of BLM-administered... Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility on BLM...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Draft Environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations (40 CFR... resulting from proposed modifications and design changes to the San Ysidro LPOE Improvements Project. The... inspection facilities, a pedestrian bridge, and a new southbound pedestrian crossing facility on the east...
Long Range Development Plan, University of California, San Diego, October 1963.
ERIC Educational Resources Information Center
Alexander, Robert E.
The academic and physical development plans of the University of California at San Diego are outlined. Facilities for 27,500 anticipated students are divided into twelve colleges of about 2300 students each. The twelve colleges are arranged into three clusters of four each, grouped around the central academic and administrative facilities, in…
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...
NASA Technical Reports Server (NTRS)
Giriunas, Julius A.
2012-01-01
Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.
NASA Technical Reports Server (NTRS)
Pachlhofer, Peter M.; Panek, Joseph W.; Dicki, Dennis J.; Piendl, Barry R.; Lizanich, Paul J.; Klann, Gary A.
2006-01-01
The Propulsion Systems Laboratory at the National Aeronautics and Space Administration (NASA) Glenn Research Center is one of the premier U.S. facilities for research on advanced aeropropulsion systems. The facility can simulate a wide range of altitude and Mach number conditions while supplying the aeropropulsion system with all the support services necessary to operate at those conditions. Test data are recorded on a combination of steady-state and highspeed data-acquisition systems. Recently a number of upgrades were made to the facility to meet demanding new requirements for the latest aeropropulsion concepts and to improve operational efficiency. Improvements were made to data-acquisition systems, facility and engine-control systems, test-condition simulation systems, video capture and display capabilities, and personnel training procedures. This paper discusses the facility s capabilities, recent upgrades, and planned future improvements.
75 FR 53332 - San Carlos Irrigation Project, Arizona
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation San Carlos Irrigation Project, Arizona AGENCY..., as amended, on the rehabilitation of San Carlos Irrigation Project (SCIP) water delivery facilities... convey irrigation water from the Gila River and Central Arizona Project (CAP) to agricultural lands in...
33 CFR 154.1016 - Facility classification by COTP.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Facility classification by COTP... Facilities § 154.1016 Facility classification by COTP. (a) The COTP may upgrade the classification of: (1) An...) The COTP may downgrade, the classification of: (1) An MTR facility specified in § 154.1015(c) to a...
28 CFR 115.18 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...
28 CFR 115.18 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...
28 CFR 115.18 - Upgrades to facilities and technologies.
Code of Federal Regulations, 2014 CFR
2014-07-01
.... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
... San Ysidro Land Port of Entry on the U.S.- Mexico Border at San Diego, CA and Tijuana, Baja CA, Mexico... renovation and expansion of the San Ysidro border crossing facility on the U.S.-Mexico border at San Diego, California and Tijuana, Baja California, Mexico. The General Services Administration (GSA) filed this...
NASA Technical Reports Server (NTRS)
Kennedy, Barbara J.
2004-01-01
The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.
The ATLAS multi-user upgrade and potential applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mustapha, B.; Nolen, J. A.; Savard, G.
With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existingmore » ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~ 1 MeV/u and isotope production at ~ 6 MeV/u or at the full ATLAS energy of ~ 15 MeV/u. The concept and proposed implementation of the ATLAS multi-user upgrade will be presented. Future plans to enhance the flexibility of this upgrade will also be presented.« less
The ATLAS multi-user upgrade and potential applications
NASA Astrophysics Data System (ADS)
Mustapha, B.; Nolen, J. A.; Savard, G.; Ostroumov, P. N.
2017-12-01
With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existing ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~1 MeV/u, isotope production and radiobiological studies at ~6 MeV/u and at the full ATLAS energy of ~15 MeV/u. The concept and proposed implementation of the ATLAS multi-user upgrade will be discussed. Future plans to enhance the flexibility of this upgrade will be presented.
Jaffrey, N.H. Facility to Upgrade its Wastewater Treatment Systems Under Clean Water Act Settlement
Under the terms of a Consent Decree lodged in federal court, EMD Millipore Corp. of Jaffrey, N.H., will upgrade its on-site wastewater treatment system to comply with the terms of the company’s industrial wastewater discharge permit & prevent...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-30
... issues associated with 945,000 square feet of new construction and approximately 500,000 square feet of... an additional 945,000 square feet of medical facility space (in addition to the existing 1.02 million square feet of medical facility space) to meet the needs of San Francisco Bay Area and northern...
40 CFR 256.24 - Recommendations for closing or upgrading open dumps.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.24 Recommendations for closing or upgrading open dumps. (a) All... feasibility of resource recovery or resource conservation to reduce the solid waste volume entering a facility...
40 CFR 256.24 - Recommendations for closing or upgrading open dumps.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.24 Recommendations for closing or upgrading open dumps. (a) All... feasibility of resource recovery or resource conservation to reduce the solid waste volume entering a facility...
Building 21st Century Schools: Designing Smarter, Sleeker High-Tech Facilities.
ERIC Educational Resources Information Center
Cutshall, Sandy
2003-01-01
The demand for high-tech programs in tandem with traditional classes challenges school districts to provide flexible facilities for career and technical education. Some districts partner with local businesses to develop state-of-the art facilities and deal with costs, upkeep, and upgrading. Some high-tech educational facilities are themselves…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... Facility Charge (PFC) Application 11-05-C-00-SFO to Impose and Use PFC Revenue at San Francisco... the application to impose and use PFC revenue at San Francisco International Airport (SFO), under the... FAA proposes to rule and invites public comment on the application to impose and use PFC revenue at...
Jefferson Lab 12 GEV Cebaf Upgrade
NASA Astrophysics Data System (ADS)
Rode, C. H.
2010-04-01
The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ˜6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a 310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-08
... Historical Society; Notice of Preliminary Determination of A Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On September 20, 2013, San Juan County Historical Society filed... County, Colorado. Applicant Contact: Beverly Rich, San Juan County Historical Society, P.O. Box 154...
Direct Reactions at the Facility for Experiments on Nuclear Reactions in Stars (FENRIS)
NASA Astrophysics Data System (ADS)
Longland, Richard; Kelley, John; Marshall, Caleb; Portillo, Federico; Setoodehnia, Kiana
2017-09-01
Nuclear cross sections are a key ingredient in stellar models designed to understand how stars evolve. Determining these cross sections, therefore, is critical for obtaining reliable predictions from stellar models. While many charged-particle reaction cross sections can be measured in the laboratory, the Coulomb barrier means that they cannot always be measured at the low energies relevant to astrophysics. In other cases, radioactive targets make the measurements unfeasible. Radioactive ion beam experiments in inverse kinematics are one solution, but low beam intensities mean that cross sections plague these attempts further. Direct measurements, particularly particle transfer experiments, are one tool in our inventory that provides us with the necessary information to infer reaction cross sections at stellar energies. I will present an overview of one facility: the Facility for Experiments on Nuclear Reactions in Stars (FENRIS), which is dedicated to performing particle transfer measurements for astrophysical cross sections. Over the past few years, FENRIS has been fully upgraded and characterized. I will show highlights of our upgrade activities and current capabilities. I will also highlight our recent experimental results and discuss current upgrade efforts.
5. INTERIOR VIEW SHOWING RAFTER CONSTRUCTION. SOUTHERN EXTENSION AT LEFT. ...
5. INTERIOR VIEW SHOWING RAFTER CONSTRUCTION. SOUTHERN EXTENSION AT LEFT. - Chollas Heights Naval Radio Transmitting Facility, Operational Storage Building, 6410 Zero Road, San Diego, San Diego County, CA
A Course on Operational Considerations in Wastewater Treatment Plant Design. Instructor's Manual.
ERIC Educational Resources Information Center
Cooper, John W.; And Others
This manual contains 17 instructional units (sequenced to correspond to parallel chapters in a student's manual) focusing on upgrading the design of wastewater plant facilities and serving as a reference source for establishing criteria for upgrading wastewater treatment plants. The manual also furnishes information for modifying plant design to…
NASA Astrophysics Data System (ADS)
Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi
2011-05-01
A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.
ERIC Educational Resources Information Center
American School & University, 1996
1996-01-01
Describes innovative strategies that schools and universities are using to save money and reshape operations. Focuses on ideas in energy efficiency and facilities improvement, direct purchasing, energy management, retrofitting buildings, ceiling insulation upgrades, automation systems, electric demand programs, facilities programs, warranty…
23 CFR 771.118 - FTA categorical exclusions
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...
23 CFR 771.118 - FTA categorical exclusions
Code of Federal Regulations, 2013 CFR
2013-04-01
...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...
National facilities study. Volume 4: Space operations facilities task group
NASA Technical Reports Server (NTRS)
1994-01-01
The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.
Working Group 5: Measurements technology and active experiments
NASA Technical Reports Server (NTRS)
Whipple, E.; Barfield, J. N.; Faelthammar, C.-G.; Feynman, J.; Quinn, J. N.; Roberts, W.; Stone, N.; Taylor, W. L.
1986-01-01
Technology issues identified by working groups 5 are listed. (1) New instruments are needed to upgrade the ability to measure plasma properties in space. (2) Facilities should be developed for conducting a broad range of plasma experiments in space. (3) The ability to predict plasma weather within magnetospheres should be improved and a capability to modify plasma weather developed. (4) Methods of control of plasma spacecraft and spacecraft plasma interference should be upgraded. (5) The space station laboratory facilities should be designed with attention to problems of flexibility to allow for future growth. These issues are discussed.
6. VIEW SOUTH TOWARD SOUTHERN PORTION OF BUILDING 1. GARAGE ...
6. VIEW SOUTH TOWARD SOUTHERN PORTION OF BUILDING 1. GARAGE ADDITION AT LEFT. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
10. INTERIOR VIEW SHOWING MOUNTINGS FROM TUNING DEVICE. VIEW SHOWS ...
10. INTERIOR VIEW SHOWING MOUNTINGS FROM TUNING DEVICE. VIEW SHOWS COPPER SHEETING ON WALLS. - Chollas Heights Naval Radio Transmitting Facility, Helix House, 6410 Zero Road, San Diego, San Diego County, CA
24. INTERIOR OF CENTRAL ROOM. BASE POWER PANEL VISIBLE ON ...
24. INTERIOR OF CENTRAL ROOM. BASE POWER PANEL VISIBLE ON RIGHT WALL OF HALLWAY. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
9. LOOKING NORTHWEST TOWARD SOUTHERN SIDES OF BUILDING 1. GARAGE ...
9. LOOKING NORTHWEST TOWARD SOUTHERN SIDES OF BUILDING 1. GARAGE ADDITION AT RIGHT. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
31. DETAIL OF OVERHEAD TENSIONER DEVICE LOCATED ABOVE SOUTHERN DOOR ...
31. DETAIL OF OVERHEAD TENSIONER DEVICE LOCATED ABOVE SOUTHERN DOOR OF BUILDING 1. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
20. INTERIOR OF SOUTHERN ROOM. VIEW LOOKING NORTHWEST TOWARD HALL ...
20. INTERIOR OF SOUTHERN ROOM. VIEW LOOKING NORTHWEST TOWARD HALL CONNECTING WITH CENTRAL ROOM. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
6. VIEW SHOWING DETAILS OF ENCLOSED FRONT PORCH ON NORTHWEST ...
6. VIEW SHOWING DETAILS OF ENCLOSED FRONT PORCH ON NORTHWEST CORNER OF BUILDING. - Chollas Heights Naval Radio Transmitting Facility, Officer's Quarters, 6410 Zero Road, San Diego, San Diego County, CA
Benchmarking of Improved DPAC Transient Deflagration Analysis Code
Laurinat, James E.; Hensel, Steve J.
2017-09-27
The deflagration pressure analysis code (DPAC) has been upgraded for use in modeling hydrogen deflagration transients. The upgraded code is benchmarked using data from vented hydrogen deflagration tests conducted at the HYDRO-SC Test Facility at the University of Pisa. DPAC originally was written to calculate peak pressures for deflagrations in radioactive waste storage tanks and process facilities at the Savannah River Site. Upgrades include the addition of a laminar flame speed correlation for hydrogen deflagrations and a mechanistic model for turbulent flame propagation, incorporation of inertial effects during venting, and inclusion of the effect of water vapor condensation on vesselmore » walls. In addition, DPAC has been coupled with chemical equilibrium with applications (CEA), a NASA combustion chemistry code. The deflagration tests are modeled as end-to-end deflagrations. As a result, the improved DPAC code successfully predicts both the peak pressures during the deflagration tests and the times at which the pressure peaks.« less
Benchmarking of Improved DPAC Transient Deflagration Analysis Code
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laurinat, James E.; Hensel, Steve J.
The deflagration pressure analysis code (DPAC) has been upgraded for use in modeling hydrogen deflagration transients. The upgraded code is benchmarked using data from vented hydrogen deflagration tests conducted at the HYDRO-SC Test Facility at the University of Pisa. DPAC originally was written to calculate peak pressures for deflagrations in radioactive waste storage tanks and process facilities at the Savannah River Site. Upgrades include the addition of a laminar flame speed correlation for hydrogen deflagrations and a mechanistic model for turbulent flame propagation, incorporation of inertial effects during venting, and inclusion of the effect of water vapor condensation on vesselmore » walls. In addition, DPAC has been coupled with chemical equilibrium with applications (CEA), a NASA combustion chemistry code. The deflagration tests are modeled as end-to-end deflagrations. As a result, the improved DPAC code successfully predicts both the peak pressures during the deflagration tests and the times at which the pressure peaks.« less
Utilizing Regional Centers in Sustaining Upgraded Russian Federation Ministry of Defense Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaldenbach, Karen Yvonne; Chainikov, General Vladimir; Fedorov, General Victor
2010-01-01
Since the mid-1990s the governments of the United States (U.S.) and the Russian Federation (RF) have been collaborating on nonproliferation projects, particularly in the protection of nuclear material through the Department of Energy's (DOE) National Nuclear Security Administration (NNSA). To date, this collaboration has resulted in upgrades to more than 72 RF Ministry of Defense (MOD) sensitive sites and facilities. These upgrades include physical protection systems (PPS), facilities to ensure material remains secure in various configurations, and infrastructure to support, maintain, and sustain upgraded sites. Significant effort on the part of both governments has also been expended to ensure thatmore » personnel obtain the necessary skills and training to both operate and maintain the security systems, thereby ensuring long term sustainability. To accomplish this, initial vendor training on physical protection systems was provided to key personnel, and an approved training curriculum was developed to teach the skills of operating, managing, administering, and maintaining the installed physical protection systems. This approach also included documentation of the processes and procedures to support infrastructure, requisite levels of maintenance and testing of systems and equipment, lifecycle management support, inventory systems and spare parts caches. One of the core components in the U.S. exit strategy and full transition to the RF MOD is the development and utilization of regional centers to facilitate centralized training and technical support to upgraded MOD sites in five regions of the RF. To date, two regional centers and one regional classroom facility are functional, and two additional regional centers are currently under construction. This paper will address the process and logistics of regional center establishment and the future vision for integrated regional center support by the RF MOD.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mohamed, Abdul Aziz; Al Rashid Megat Ahmad, Megat Harun; Md Idris, Faridah
2010-01-05
Malaysian Nuclear Agency's (Nuclear Malaysia) Small Angle Neutron Scattering (SANS) facility--(MYSANS)--is utilizing low flux of thermal neutron at the agency's 1 MW TRIGA reactor. As the design nature of the 8 m SANS facility can allow object resolution in the range between 5 and 80 nm to be obtained. It can be used to study alloys, ceramics and polymers in certain area of problems that relate to samples containing strong scatterers or contrast. The current SANS system at Malaysian Nuclear Agency is only capable to measure Q in limited range with a PSD (128x128) fixed at 4 m from themore » sample. The existing reactor hall that incorporate this MYSANS facility has a layout that prohibits the rebuilding of MYSANS therefore the position between the wavelength selector (HOPG) and sample and the PSD cannot be increased for wider Q range. The flux of the neutron at current sample holder is very low which around 10{sup 3} n/cm{sup 2}/sec. Thus it is important to rebuild the MYSANS to maximize the utilization of neutron. Over the years, the facility has undergone maintenance and some changes have been made. Modification on secondary shutter and control has been carried out to improve the safety level of the instrument. A compact micro-focus SANS method can suit this objective together with an improve cryostat system. This paper will explain some design concept and approaches in achieving higher flux and the modification needs to establish the micro-focused SANS.« less
19. WINDOW DETAIL, NORTH WALL OF GARAGE ADDITION. VIEW SHOWS ...
19. WINDOW DETAIL, NORTH WALL OF GARAGE ADDITION. VIEW SHOWS CONCRETE BLOCK CONSTRUCTION OF ADDITION. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
6. DOUBLE METAL DOORS ON WEST SIDE WITH CABLES ENTERING ...
6. DOUBLE METAL DOORS ON WEST SIDE WITH CABLES ENTERING GROUND AT NORTH END OF BUILDING. - Chollas Heights Naval Radio Transmitting Facility, Helix House, 6410 Zero Road, San Diego, San Diego County, CA
3. OBLIQUE VIEW LOOKING NORTHWEST SHOWING GARAGE EXTENSION WITH DOORS. ...
3. OBLIQUE VIEW LOOKING NORTHWEST SHOWING GARAGE EXTENSION WITH DOORS. VIEW FROM BUILDING 15. - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA
1. WEST SIDE, NORTH END OF BUILDING 1. SHOWS ADDITIONAL ...
1. WEST SIDE, NORTH END OF BUILDING 1. SHOWS ADDITIONAL ANGLES IN BUILDING AT SOUTHERN END. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
14. DETAIL OF ENTRANCE OVERHANG, WEST SIDE OF NORTH PORTION. ...
14. DETAIL OF ENTRANCE OVERHANG, WEST SIDE OF NORTH PORTION. SAME FEATURE AS A-13. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
A Course on Operational Considerations in Wastewater Treatment Plant Design. Student Manual.
ERIC Educational Resources Information Center
Stottler, Stag and Associates, San Antonio, TX.
This manual was designed to furnish information for upgrading the design of wastewater treatment plant facilities and to serve as a resource for establishing criteria for upgrading these plants. The manual also furnishes information for modifying plant design to compensate for current organic and hydraulic overloads and/or to meet more stringent…
NASA Technical Reports Server (NTRS)
Dudley, Stephanie R. B.; Marsh, Angela L.
2014-01-01
With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.
Reactivation and upgrade of the NASA Ames 16-Inch Shock Tunnel - Status report
NASA Technical Reports Server (NTRS)
Bogdanoff, David W.; Zambrana, Horacio A.; Cavolowsky, John A.; Newfield, Mark E.; Cornelison, Charles J.; Miller, Robert J.
1992-01-01
The NASA Ames 16-Inch Shock Tunnel has been reactivated after seventeen years of inactivity. In the years before deactivating the facility, it was operated at enthalpies of 4,700 J/gm and pressures up to 260 atm or at enthalpies of 1900 J/gm over a wide pressure range. Since reactivating, the facility has been operated at enthalpies up to 12,000 J/gm and pressures up to 408 atm. The present paper describes the steps taken in upgrading the facility and summarizes the currently achievable conditions. The selection of the driver gas, the steps taken to improve the driver burn, and the diaphragm opening techniques are described. The pressure and heat flux instrumentation, the optical diagnostics and the data acquisition system are also described.
Mitigating risks related to facilities management.
O'Neill, Daniel P; Scarborough, Sydney
2013-07-01
By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.
High resolution upgrade of the ATF damping ring BPM system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terunuma, N.; Urakawa, J.; /KEK, Tsukuba
2008-05-01
A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented.
The ISOLDE facility and the HIE-HISOLDE project: Recent highlights
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borge, M. J. G.
2014-07-23
The ISOLDE facility at CERN has as objective the production, study and research of nuclei far from stability. The facility provides low energy radioactive beams and post-accelerated beams. In the last 45 years the ISOLDE facility has gathered unique expertise in research with radioactive beams. Over 700 isotopes of more than 70 elements have been used in a wide range of research domains, including cutting edge studies in nuclear structure, atomic physics, nuclear astrophysics, and fundamental interactions. These nuclear probes are also used to do frontier research in solid state and life sciences. There is an on-going upgrade of themore » facility, the HIE-ISOLDE project, which aims to improve the ISOLDE capabilities in a wide front, from an energy increase of the post-accelerated beam to improvements in beam quality and beam purity. The first phase of HIE-ISOLDE will start for physics in the autumn of 2015 with an upgrade of energy for all post-accelerated ISOLDE beams up to 5.5 MeV/u. In this contribution the most recent highlights of the facility are presented.« less
1. VIEW LOOKING NORTH IN SHOP AREA. BUILDING 15 ON ...
1. VIEW LOOKING NORTH IN SHOP AREA. BUILDING 15 ON RIGHT, BUILDING 22 ON LEFT, AND BUILDING 1 IN DISTANCE. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA
4. SOUTH SIDE OF BUILDING 2, (HANDBALL COURT ADDITION) SHOWING ...
4. SOUTH SIDE OF BUILDING 2, (HANDBALL COURT ADDITION) SHOWING RELATIONSHIP WITH GARAGE ADDITION OF BUILDING 1. - Chollas Heights Naval Radio Transmitting Facility, Helix House, 6410 Zero Road, San Diego, San Diego County, CA
6. INTERIOR DETAIL OF WINDOW IN EAST WALL NORTH END ...
6. INTERIOR DETAIL OF WINDOW IN EAST WALL NORTH END ROOM. BUILDING 4 IS VISIBLE THROUGH WINDOW. - Chollas Heights Naval Radio Transmitting Facility, Recreation Building, 6410 Zero Road, San Diego, San Diego County, CA
2. NORTH SIDE. MASTER AERIAL SWITCH ON LOWER RIGHT PORTION ...
2. NORTH SIDE. MASTER AERIAL SWITCH ON LOWER RIGHT PORTION OF WALL. TRIPOD AND TENSION WEIGHTS AT LEFT. - Chollas Heights Naval Radio Transmitting Facility, Helix House, 6410 Zero Road, San Diego, San Diego County, CA
1. WEST SIDE. VIEW SHOWS CLERESTORY WINDOWS IN ROOF AND ...
1. WEST SIDE. VIEW SHOWS CLERESTORY WINDOWS IN ROOF AND RELATIONSHIP WITH BUILDING 13 AT RIGHT. - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA
22. INTERIOR OF SOUTHERN ROOM LOOKING SOUTH TOWARD DOORS AND ...
22. INTERIOR OF SOUTHERN ROOM LOOKING SOUTH TOWARD DOORS AND WINDOWS. EARLY TENSION DEVICE VISIBLE ABOVE DOORWAY. - Chollas Heights Naval Radio Transmitting Facility, Transmitter Building, 6410 Zero Road, San Diego, San Diego County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket 36-2010] Foreign-Trade Zone 18--San Jose... Board) by the City of San Jose, grantee of FTZ 18, requesting special-purpose subzone status for the... formally filed on May 18, 2010. The Lam facilities (1,483 employees, 1,020 systems per year capacity...
CSU's MWV Observatory: A Facility for Research, Education and Outreach
NASA Astrophysics Data System (ADS)
Hood, John; Carpenter, N. D.; McCarty, C. B.; Samford, J. H.; Johnson, M.; Puckett, A. W.; Williams, R. N.; Cruzen, S. T.
2014-01-01
The Mead Westvaco Observatory (MWVO), located in Columbus State University's Coca-Cola Space Science Center, is dedicated to education and research in astronomy through hands-on engagement and public participation. The MWVO has recently received funding to upgrade from a 16-inch Meade LX-200 telescope to a PlaneWave CDK 24-inch Corrected Dall-Kirkham Astrograph telescope. This and other technological upgrades will allow this observatory to stream live webcasts for astronomical events, allowing a worldwide public audience to become a part of the growing astronomical community. This poster will explain the upgrades that are currently in progress as well as the results from the current calibrations. The goal of these upgrades is to provide facilities capable of both research-class projects and widespread use in education and public outreach. We will present our initial calibration and tests of the observatory equipment, as well as its use in webcasts of astronomical events, in solar observing through the use of specialized piggy-backed telescopes, and in research into such topics as asteroids, planetary and nebula imaging. We will describe a pilot research project on asteroid orbit refinement and light curves, to be carried out by Columbus State University students. We will also outline many of the K-12 educational and public outreach activities we have designed for these facilities. Support and funding for the acquisition and installation of the new PlaneWave CDK 24 has been provided by the International Museum and Library Services via the Museums for America Award.
Jefferson Lab Science: Present and Future
McKeown, Robert D.
2015-02-12
The Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab comprise a unique facility for experimental nuclear physics. Furthermore, this facility is presently being upgraded, which will enable a new experimental program with substantial discovery potential to address important topics in nuclear, hadronic, and electroweak physics. Further in the future, it is envisioned that the Laboratory will evolve into an electron-ion colliding beam facility.
Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility
NASA Technical Reports Server (NTRS)
Webb, Andrew T.; Powers, Edward I. (Technical Monitor)
2000-01-01
The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.
Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility
NASA Technical Reports Server (NTRS)
Webb, Andrew
2000-01-01
The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.
Modular Filter and Source-Management Upgrade of RADAC
NASA Technical Reports Server (NTRS)
Lanzi, R. James; Smith, Donna C.
2007-01-01
In an upgrade of the Range Data Acquisition Computer (RADAC) software, a modular software object library was developed to implement required functionality for filtering of flight-vehicle-tracking data and management of tracking-data sources. (The RADAC software is used to process flight-vehicle metric data for realtime display in the Wallops Flight Facility Range Control Center and Mobile Control Center.)
7. WINDOW DETAIL SOUTHERN WALL OF BUILDING. (SOUTH SIDE OF ...
7. WINDOW DETAIL SOUTHERN WALL OF BUILDING. (SOUTH SIDE OF BUILDING 4 IS NOW WITHIN BUILDING 40 GARAGE.) - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA
3. VIEW SHOWING RELATIONSHIP OF EAST SIDES OF BUILDINGS 15 ...
3. VIEW SHOWING RELATIONSHIP OF EAST SIDES OF BUILDINGS 15 ON LEFT, BUILDING 40 GARAGE IN CENTER, AND BUILDING 4 IN DISTANCE. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA
3. EAST SIDE SHOWING RECREATION PATIO ADDITION AT SOUTHERN END. ...
3. EAST SIDE SHOWING RECREATION PATIO ADDITION AT SOUTHERN END. TWO-STORY PORTION AT SOUTHERN END CONTAINS 'RIGGING LOFT.' - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA
1. OBLIQUE VIEW, NORTH AND EAST SIDES. VIEW SHOWS POSITION ...
1. OBLIQUE VIEW, NORTH AND EAST SIDES. VIEW SHOWS POSITION OF BUILDING UNDER LEG OF TOWER 33. - Chollas Heights Naval Radio Transmitting Facility, PERS Support Storage Building, 6410 Zero Road, San Diego, San Diego County, CA
5. WEST SIDE. VIEW FROM BUILDING 18 SHOWING SOUTH PORTION ...
5. WEST SIDE. VIEW FROM BUILDING 18 SHOWING SOUTH PORTION OF BUILDING 22 WITH TALLER NORTH PORTION BEYOND.. - Chollas Heights Naval Radio Transmitting Facility, Public Works Shop, 6410 Zero Road, San Diego, San Diego County, CA
New hypersonic facility capability at NASA Lewis Research Center
NASA Technical Reports Server (NTRS)
Haas, Jeffrey E.; Chamberlin, Roger; Dicus, John H.
1989-01-01
Four facility activities are underway at NASA Lewis Research Center to develop new hypersonic propulsion test capability. Two of these efforts consist of upgrades to existing operational facilities. The other two activities will reactivate facilities that have been in a standby condition for over 15 years. These four activities are discussed and the new test facilities NASA Lewis will have in place to support evolving high speed research programs are described.
2000-01-24
JoAnn Morgan, associate director for Advanced Development and Shuttle Upgrades at KSC, studies posters of space-related news stories in the mobile exhibition called "NewsCapade with Al Neuharth." The exhibit started its cross-country tour in San Francisco in April. It is a traveling version of the Newseum in Arlington, Va. Morgan was among four speakers discussing "Space, the Media and the Millennium" at a reception Jan. 24 kicking off the display at KSC
2000-01-24
JoAnn Morgan, associate director for Advanced Development and Shuttle Upgrades at KSC, studies posters of space-related news stories in the mobile exhibition called "NewsCapade with Al Neuharth." The exhibit started its cross-country tour in San Francisco in April. It is a traveling version of the Newseum in Arlington, Va. Morgan was among four speakers discussing "Space, the Media and the Millennium" at a reception Jan. 24 kicking off the display at KSC
Nitrogen removal process optimization in New York City WPCPS: a case study of Wards Island WPCP.
Ramalingam, K; Fillos, J; Musabyimana, M; Deur, A; Beckmann, K
2009-01-01
The New York City Department of Environmental Protection has been engaged in a continuous process to develop a nitrogen removal program to reduce the nitrogen mass discharge from its water pollution control plants, (WPCPs), from 49,158 kg/d to 20,105 kg/d by the year 2017 as recommended by the Long Island Sound Study. As part of the process, a comprehensive research effort was undertaken involving bench, pilot and full scale studies to identify the most effective way to upgrade and optimize the existing WPCPs. Aeration tank 13 (AT-13) at the Wards Island WPCP was particularly attractive as a full-scale research facility because its aeration tank with its dedicated final settling tanks and RAS pumps could be isolated from the remaining treatment facilities. The nitrogen removal performance of AT-13, which, at the time, was operated as a "basic step feed BNR Facility", was evaluated and concurrently nitrification kinetic parameters were measured using in-situ bench scale experiments. Additional bench scale experiments provided denitrification rates using different sources of carbon and measurement of the maximum specific growth rate of nitrifying bacteria. The combined findings were then used to upgrade AT-13 to a "full" BNR facility with carbon and alkalinity addition. This paper will focus on the combined bench and full scale results that were the basis for the consequent upgrade.
Conceptual design for a user-friendly adaptive optics system at Lick Observatory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bissinger, H.D.; Olivier, S.; Max, C.
1996-03-08
In this paper, we present a conceptual design for a general-purpose adaptive optics system, usable with all Cassegrain facility instruments on the 3 meter Shane telescope at the University of California`s Lick Observatory located on Mt. Hamilton near San Jose, California. The overall design goal for this system is to take the sodium-layer laser guide star adaptive optics technology out of the demonstration stage and to build a user-friendly astronomical tool. The emphasis will be on ease of calibration, improved stability and operational simplicity in order to allow the system to be run routinely by observatory staff. A prototype adaptivemore » optics system and a 20 watt sodium-layer laser guide star system have already been built at Lawrence Livermore National Laboratory for use at Lick Observatory. The design presented in this paper is for a next- generation adaptive optics system that extends the capabilities of the prototype system into the visible with more degrees of freedom. When coupled with a laser guide star system that is upgraded to a power matching the new adaptive optics system, the combined system will produce diffraction-limited images for near-IR cameras. Atmospheric correction at wavelengths of 0.6-1 mm will significantly increase the throughput of the most heavily used facility instrument at Lick, the Kast Spectrograph, and will allow it to operate with smaller slit widths and deeper limiting magnitudes. 8 refs., 2 figs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Powell, Danny H; Elwood Jr, Robert H
2011-01-01
An effective risk assessment system is needed to address the threat posed by an active or passive insider who, acting alone or in collusion, could attempt diversion or theft of nuclear material. The material control and accountability (MC&A) system effectiveness tool (MSET) is a self-assessment or inspection tool utilizing probabilistic risk assessment (PRA) methodology to calculate the system effectiveness of a nuclear facility's material protection, control, and accountability (MPC&A) system. The MSET process is divided into four distinct and separate parts: (1) Completion of the questionnaire that assembles information about the operations of every aspect of the MPC&A system; (2)more » Conversion of questionnaire data into numeric values associated with risk; (3) Analysis of the numeric data utilizing the MPC&A fault tree and the SAPHIRE computer software; and (4) Self-assessment using the MSET reports to perform the effectiveness evaluation of the facility's MPC&A system. The process should lead to confirmation that mitigating features of the system effectively minimize the threat, or it could lead to the conclusion that system improvements or upgrades are necessary to achieve acceptable protection against the threat. If the need for system improvements or upgrades is indicated when the system is analyzed, MSET provides the capability to evaluate potential or actual system improvements or upgrades. A facility's MC&A system can be evaluated at a point in time. The system can be reevaluated after upgrades are implemented or after other system changes occur. The total system or specific subareas within the system can be evaluated. Areas of potential system improvement can be assessed to determine where the most beneficial and cost-effective improvements should be made. Analyses of risk importance factors show that sustainability is essential for optimal performance and reveals where performance degradation has the greatest impact on total system risk. The risk importance factors show the amount of risk reduction achievable with potential upgrades and the amount of risk reduction achieved after upgrades are completed. Applying the risk assessment tool gives support to budget prioritization by showing where budget support levels must be sustained for MC&A functions most important to risk. Results of the risk assessment are also useful in supporting funding justifications for system improvements that significantly reduce system risk. The functional model, the system risk assessment tool, and the facility evaluation questionnaire are valuable educational tools for MPC&A personnel. These educational tools provide a framework for ongoing dialogue between organizations regarding the design, development, implementation, operation, assessment, and sustainability of MPC&A systems. An organization considering the use of MSET as an analytical tool for evaluating the effectiveness of its MPC&A system will benefit from conducting a complete MSET exercise at an existing nuclear facility.« less
75 FR 13340 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...--design and construction. Terminal facility improvements--design and construction. Runway pavement overlay... Collection at CHS and Use at CHS: Upgrade police radio communications. Design flight/baggage information... expansion--design. Standardize airfield signage. Restripe airfield taxiway and ramp edge. Improve airport...
PBO Southwest Region: Baja Earthquake Response and Network Operations
NASA Astrophysics Data System (ADS)
Walls, C. P.; Basset, A.; Mann, D.; Lawrence, S.; Jarvis, C.; Feaux, K.; Jackson, M. E.
2011-12-01
The SW region of the Plate Boundary Observatory consists of 455 continuously operating GPS stations located principally along the transform system of the San Andreas fault and Eastern California Shear Zone. In the past year network uptime exceeded an average of 97% with greater than 99% data acquisition. Communications range from CDMA modem (307), radio (92), Vsat (30), DSL/T1/other (25) to manual downloads (1). Sixty-three stations stream 1 Hz data over the VRS3Net typically with <0.5 second latency. Over 620 maintenance activities were performed during 316 onsite visits out of approximately 368 engineer field days. Within the past year there have been 7 incidences of minor (attempted theft) to moderate vandalism (solar panel stolen) with one total loss of receiver and communications gear. Security was enhanced at these sites through fencing and more secure station configurations. In the past 12 months, 4 new stations were installed to replace removed stations or to augment the network at strategic locations. Following the M7.2 El Mayor-Cucapah earthquake CGPS station P796, a deep-drilled braced monument, was constructed in San Luis, AZ along the border within 5 weeks of the event. In addition, UNAVCO participated in a successful University of Arizona-led RAPID proposal for the installation of six continuous GPS stations for post-seismic observations. Six stations are installed and telemetered through a UNAM relay at the Sierra San Pedro Martir. Four of these stations have Vaisala WXT520 meteorological sensors. An additional site in the Sierra Cucapah (PTAX) that was built by CICESE, an Associate UNAVCO Member institution in Mexico, and Caltech has been integrated into PBO dataflow. The stations will be maintained as part of the PBO network in coordination with CICESE. UNAVCO is working with NOAA to upgrade PBO stations with WXT520 meteorological sensors and communications systems capable of streaming real-time GPS and met data. The real-time GPS and meteorological sensor data streaming support watershed and flood analyses for regional early-warning systems related to NOAA's work with California Department of Water Resources. Currently 19 stations are online and streaming with 7 more in preparation. In 2008 PBO became the steward of 209 existing network stations of which 140 are in the SW region that included SCIGN, BARD, BARGEN stations. Due to the mix of incompatible equipment used between PBO and existing network stations a project was undertaken to standardize existing network GPS stations to PBO specifications by upgrading power systems and enclosures. To date 96 stations have been upgraded. UNAVCO is currently funded through a USGS ARRA grant to construct 8 new GPS stations in the San Francisco Bay Area capable of streaming high rate data. At present 6 stations are built with 2 permits outstanding.
Wetlands Mitigation Banking Concepts
1992-07-01
Naval Amphibious Bas Eslgrss Mit. Bank CA, San Diego Co. dredging & facilities Dept of the Navy SeaWorld Eelgras Mitigation Dank CA, San Diego Co...shore development, private projects SeaWorld 8 Table 2. WETLAND MITIGATION BANKS UNDER PLANNING, Institute for Water Resources Preliminary Survey Data
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
...- Health Research, University of Present [dagger]. California (Davis). Laboratory of Biomedical and Los... Radiobiology and San Francisco..... 1951-1999. Environmental Health, University of California (San Francisco........... New Brunswick..... 1948-1977. Princeton Plasma Physics Princeton......... 1951-Present. Laboratory...
8. GENERAL VIEW OF TOWER 32, LEFT, AND TOWER 31, ...
8. GENERAL VIEW OF TOWER 32, LEFT, AND TOWER 31, RIGHT. VIEW LOOKING NORTH SHOWING AERIAL WIRE DESIGN WITH VERTICAL 'TOP HAT' WIRES IN CENTER. - Chollas Heights Naval Radio Transmitting Facility, 6410 Zero Road, San Diego, San Diego County, CA
Graham, Jennifer L.; Stone, Mandy L.; Rasmussen, Teresa J.; Poulton, Barry C.
2010-01-01
The Johnson County Blue River Main Wastewater Treatment Facility discharges into the upper Blue River near the border between Johnson County, Kansas and Jackson County, Missouri. During 2005 through 2007 the wastewater treatment facility underwent upgrades to increase capacity and include biological nutrient removal. The effects of wastewater effluent on environmental and biological conditions of the upper Blue River were assessed by comparing an upstream site to two sites located downstream from the wastewater treatment facility. Environmental conditions were evaluated using previously and newly collected discrete and continuous data, and were compared with an assessment of biological community composition and ecosystem function along the upstream-downstream gradient. This evaluation is useful for understanding the potential effects of wastewater effluent on water quality, biological community structure, and ecosystem function. In addition, this information can be used to help achieve National Pollution Discharge Elimination System (NPDES) wastewater effluent permit requirements after additional studies are conducted. The effects of wastewater effluent on the water-quality conditions of the upper Blue River were most evident during below-normal and normal streamflows (about 75 percent of the time), when wastewater effluent contributed more than 20 percent to total streamflow. The largest difference in water-quality conditions between the upstream and downstream sites was in nutrient concentrations. Total and inorganic nutrient concentrations at the downstream sites during below-normal and normal streamflows were 4 to 15 times larger than at the upstream site, even after upgrades to the wastewater treatment facility were completed. However, total nitrogen concentrations decreased in wastewater effluent and at the downstream site following wastewater treatment facility upgrades. Similar decreases in total phosphorus were not observed, likely because the biological phosphorus removal process was not optimized until after the study was completed. Total nitrogen and phosphorus from the wastewater treatment facility contributed a relatively small percentage (14 to 15 percent) to the annual nutrient load in the upper Blue River, but contributed substantially (as much as 75 percent) to monthly loads during seasonal low-flows in winter and summer. During 2007 and 2008, annual discharge from the wastewater treatment facility was about one-half maximum capacity, and estimated potential maximum annual loads were 1.6 to 2.4 times greater than annual loads before capacity upgrades. Even when target nutrient concentrations are met, annual nutrient loads will increase when the wastewater treatment facility is operated at full capacity. Regardless of changes in annual nutrient loads, the reduction of nutrient concentrations in the Blue River Main wastewater effluent will help prevent further degradation of the upper Blue River. The Blue River Main Wastewater Treatment Facility wastewater effluent caused changes in concentrations of several water-quality constituents that may affect biological community structure and function including larger concentrations of bioavailable nutrients (nitrate and orthophosphorus) and smaller turbidities. Streambed-sediment conditions were similar along the upstream-downstream gradient and measured constituents did not exceed probable effect concentrations. Habitat conditions declined along the upstream-downstream gradient, largely because of decreased canopy cover and riparian buffer width and increased riffle-substrate fouling. Algal biomass, primary production, and the abundance of nutrient-tolerant diatoms substantially increased downstream from the wastewater treatment facility. Likewise, the abundance of intolerant macroinvertebrate taxa and Kansas Department of Health and Environment aquatic-life-support scores, derived from macroinvertebrate data, significantly decreased downstream from the wastewater
Assessing Sediment Transport at Navy Facilities (User’s Guide)
2007-09-01
Mytilus edulis), a soft shell clam (Mya arenaria), hairy sea cucumbers (Sclerodactyla briareus), lobsters (Homarus americanus), purple sea urchins ...Diego P. J. White CH2M HILL C. A. Jones Sea Engineering, Inc. Approved for public release; distribution is unlimited. SSC San Diego...Diego P. J. White CH2M HILL C. A. Jones Sea Engineering, Inc. Approved for public release; distribution is unlimited. SSC San Diego San
Code of Federal Regulations, 2011 CFR
2011-04-01
... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...
Code of Federal Regulations, 2012 CFR
2012-04-01
... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...
Code of Federal Regulations, 2014 CFR
2014-04-01
... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...
Code of Federal Regulations, 2013 CFR
2013-04-01
... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...
40 CFR 256.23 - Requirements for closing or upgrading open dumps.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid... classification of existing solid waste disposal facilities according to the criteria. This classification shall... solid waste disposal facility; (2) The availability of State regulatory and enforcement powers; and (3...
40 CFR 256.23 - Requirements for closing or upgrading open dumps.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid... classification of existing solid waste disposal facilities according to the criteria. This classification shall... solid waste disposal facility; (2) The availability of State regulatory and enforcement powers; and (3...
Telescopio San Pedro Mártir Observatory preliminary design and project approach
NASA Astrophysics Data System (ADS)
Teran, Jose; Lee, William H.; Richer, Michael G.; Sánchez, Beatriz S.; Urdaibay, David; Hill, Derek; Adriaanse, David; Hernandez-Limonchi, Regina
2016-07-01
The Instituto de Astronomia of the Universidad Nacional Autónoma de México (UNAM) along with Instituto Nacional de Astrofisica, Optica y Electronica, the University of Arizona and the Smithsonian Astrophysical Observatory are developing the Telescopio San Pedro Mártir (TSPM) project, a 6.5m diameter optical telescope. M3 Engineering and Technology Corp. (M3) is the design and construction management firm responsible for all site infrastructure, enclosure and support facilities. The Telescopio San Pedro Mártir project (TSPM) will be located within the San Pedro Mártir National Park in Baja California, Mexico at 2,830 m. above sea level, approximately 65 km. east of the Pacific Ocean, 55km west of the Sea of Cortes (Gulf of California) and 180km south of the United States and México border. The aim of the paper is to present the preliminary design of the site infrastructure, enclosure and support facilities to date and share the design and construction approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Geet, Otto
NREL has developed a methodology to prioritize which data center cooling systems could be upgraded for better efficiency based on estimated cost savings and economics. The best efficiency results are in cool or dry climates where 'free' economizer or evaporative cooling can provide most of the data center cooling. Locations with a high cost of energy and facilities with high power usage effectiveness (PUE) are also good candidates for data center cooling system upgrades. In one case study of a major cable provider's data centers, most of the sites studied had opportunities for cost-effective cooling system upgrades with payback periodmore » of 5 years or less. If the cable provider invested in all opportunities for upgrades with payback periods of less than 15 years, it could save 27% on annual energy costs.« less
Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities
NASA Technical Reports Server (NTRS)
Emrich, William J. Jr.; Moran, Robert P.; Pearson, J. Boise
2012-01-01
To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities
1994-09-01
Business Managers. Ed. Betty Seldner. San Francisco : McGraw Hill, Inc., 1994 11. Gunderson, John. "Federal Facilities Compliance Act," in Environmental...Decision Making for Engineering and Business Managers. Ed. Betty Seldner. San Francisco : McGraw Hill, Inc., 1994 105 12. Heyman, Glenn. "The Role and...San Francisco . McGraw Hill, Inc., 1994 13- Hill, Chuck. Environmental Oversight Branch, Headquarters Air Combat Command. Personal Correspondence
Novel Therapeutic Targets to Treat Social Behavior Deficits in Autism and Related Disorders
2016-06-01
INVESTIGATOR: Georgianna G. Gould, M.S., Ph.D. CONTRACTING ORGANIZATION: The University of Texas Health Science Center at San Antonio San Antonio, TX...PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER The University of Texas Health Science Center at San Antonio 7703...Collaborating Consultants are at the University of Texas Health Science Center Facility, and all experiments will be performed on-site, so there were
The Explosive Pulsed Power Test Facility at AFRL
2005-06-01
Air Force Research Laboratory , AFRL /DEHP, Albuquerque...NM 87117 S. Coffey, A. Brown, B. Guffey NumerEx, Albuquerque, NM Abstract The Air Force Research Laboratory has developed and tested a...Chestnut Site on Kirtland Air Force Base. The facility is described in this paper, including details of recent upgrades. I.
Building Renovation in ARL Libraries. SPEC Kit 97.
ERIC Educational Resources Information Center
Hersberger, Rodney M.
This collection of library documents related to building renovation, by members of the Association of Research Libraries (ARL), contains excerpts from: (1) a plan for upgrading and expanding library facilities at the University of Kansas; (2) a report on storage facilities at Rutgers University; (3) documents presenting the essential remodeling…
Master Planning School District Facility Needs
ERIC Educational Resources Information Center
Prager, Gary; Matschulat, Robert
2010-01-01
Most educational entities confront any number of facility issues. Upgrading the physical infrastructure to meet current and future demands can be intimidating. The quantity and magnitude of capital issues in a changing environment can be overwhelming. How can all this complexity be made coherent to assure that decisions are sound and limited…
Natural phenomena hazards design and evaluation criteria for Department of Energy Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-04-01
This DOE standard gives design and evaluation criteria for natural phenomena hazards (NPH) effects as guidance for implementing the NPH mitigation requirements of DOE 5480.28. Goal of the criteria is to assure that DOE facilities can withstand the effects of earthquakes, extreme winds, tornadoes, flooding, etc. They apply to the design of new facilities and the evaluation of existing facilities; they may also be used for modification and upgrading of the latter.
San Jose Unified School District Health & Safety Guide for Facilities and Construction.
ERIC Educational Resources Information Center
2001
This guide from the San Jose Unified School District describes recommended procedures to promote and maintain a healthy and safe school environment during maintenance, modernization, or construction. Guidelines are presented in the following areas: (1) construction safety; (2) communication; (3) material selection; (4) heating, ventilation, and…
2010-09-29
estimate for FY10 includes 40% of MRI imaging equipment upgrade at San Francisco for Gulf War research and use of unobligated FY2009 UTSW Contract funds...atrophy. (2) Explore the sensitivity of these tests to the localization of focal brain damage as confirmed on magnetic resonance imaging ( MRI ) in...2004 Gulf War RFA Effects of Gulf War Illness on Brain Structure, Function and Metabolism: MRI /MRS at 4 Tesla Gulf War Veterans Determine if
2010-09-29
estimate for FY10 includes 40% of MRI imaging equipment upgrade at San Francisco for Gulf War research and use of unobligated FY2009 UTSW Contract...atrophy. (2) Explore the sensitivity of these tests to the localization of focal brain damage as confirmed on magnetic resonance imaging ( MRI ) in...16 2004 Gulf War RFA Effects of Gulf War Illness on Brain Structure, Function and Metabolism: MRI /MRS at 4 Tesla Gulf War Veterans Determine
Game theoretic analysis of physical protection system design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Canion, B.; Schneider, E.; Bickel, E.
The physical protection system (PPS) of a fictional small modular reactor (SMR) facility have been modeled as a platform for a game theoretic approach to security decision analysis. To demonstrate the game theoretic approach, a rational adversary with complete knowledge of the facility has been modeled attempting a sabotage attack. The adversary adjusts his decisions in response to investments made by the defender to enhance the security measures. This can lead to a conservative physical protection system design. Since defender upgrades were limited by a budget, cost benefit analysis may be conducted upon security upgrades. One approach to cost benefitmore » analysis is the efficient frontier, which depicts the reduction in expected consequence per incremental increase in the security budget.« less
Fuel quality/processing study. Volume 3: Fuel upgrading studies
NASA Technical Reports Server (NTRS)
Jones, G. E., Jr.; Bruggink, P.; Sinnett, C.
1981-01-01
The methods used to calculate the refinery selling prices for the turbine fuels of low quality are described. Detailed descriptions and economics of the upgrading schemes are included. These descriptions include flow diagrams showing the interconnection between processes and the stream flows involved. Each scheme is in a complete, integrated, stand alone facility. Except for the purchase of electricity and water, each scheme provides its own fuel and manufactures, when appropriate, its own hydrogen.
NPDES Permit: Shiprock Wastewater Treatment Facility, Shiprock, New Mexico
NPDES Permit, Fact Sheet, and Response to Comments explaining EPA's issue of NPDES Permit No. NN0020621 to the Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility, Shiprock, San Juan County, New Mexico.
Assembly and commissioning of a new SRF cryomodule for the ATLAS intensity upgrade
NASA Astrophysics Data System (ADS)
Conway, Z. A.; Barcikowski, A.; Cherry, G. L.; Fischer, R. L.; Fuerst, J. D.; Jansma, W. G.; Gerbick, S. M.; Kedzie, M. J.; Kelly, M. P.; Kim, S. H.; MacDonald, S. W. T.; Murphy, R. C.; Ostroumov, P. N.; Reid, T. C.; Shepard, K. W.
2014-01-01
The Argonne National Laboratory Physics Division is in the final stages of a major upgrade to the Argonne Tandem Linear Accelerator System national user facility, referred to as the intensity upgrade. The intensity upgrade project will substantially increase beam currents for experimenters working with the existing ATLAS stable and in-flight rare isotope beams and for the neutron-rich beams from the Californium Rare Isotope Breeder Upgrade. This project includes the replacement of three existing cryomodules, containing 18 superconducting accelerator cavities and 9 superconducting solenoids, with a single cryomodule with seven SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This presentation will report: how we minimized the heat load into the 4 K and 80 K coolant streams feeding the cryomodule, a comparison of the calculated and measured static heat loads at 80 K and the mechanical design of the vacuum vessel.
Scientific Design of the New Neutron Radiography Facility (SANRAD) at SAFARI-1 for South Africa
NASA Astrophysics Data System (ADS)
de Beer, F. C.; Gruenauer, F.; Radebe, J. M.; Modise, T.; Schillinger, B.
The final scientific design for an upgraded neutron radiography/tomography facility at beam port no.2 of the SAFARI-1 nuclear research reactor has been performed through expert advice from Physics Consulting, FRMII in Germany and IPEN, Brazil. A need to upgrade the facility became apparent due to the identification of various deficiencies of the current SANRAD facility during an IAEA-sponsored expert mission of international scientists to Necsa, South Africa. A lack of adequate shielding that results in high neutron background on the beam port floor, a mismatch in the collimator aperture to the core that results in a high gradient in neutron flux on the imaging plane and due to a relative low L/D the quality of the radiographs are poor, are a number of deficiencies to name a few.The new design, based on results of Monte Carlo (MCNP-X) simulations of neutron- and gamma transport from the reactor core and through the new facility, is being outlined. The scientific design philosophy, neutron optics and imaging capabilities that include the utilization of fission neutrons, thermal neutrons, and gamma-rays emerging from the core of SAFARI-1 are discussed.
ERIC Educational Resources Information Center
Kennedy, Mike
2003-01-01
Offers ten suggestions for schools and universities to maximize their budgets: energy upgrades, security technology, maintenance management systems, partnerships, modernized washrooms, windows, facilities assessment, outsourcing, alternative fuels, and building commissioning. (EV)
ERIC Educational Resources Information Center
Nevada Univ., Reno. School Planning Lab.
THE FEASIBILITY AND METHODS OF USING MOBILE FACILITIES IN UPGRADING THE WORK SKILLS OF RURAL LOW INCOME WAGE EARNERS ARE EXPLORED. SUCH MOBILE FACILITIES WOULD BE DIRECTED TOWARD 3 SPECIFIC GROUPS OF PEOPLE--SMALL ACREAGE FARMERS WHO PRODUCED ONLY A MINIMAL INCOME, THE RURAL LOW-INCOME NEGRO POPULATION, AND YOUNG RURAL SCHOOL DROPOUTS WITH LITTLE…
ERIC Educational Resources Information Center
Wilkinson, Ron
2009-01-01
Many schools and universities want the U.S. Green Building Council's LEED certification for their facilities, but they are concerned about cost. This certification is tangible evidence that a facility is designed to conserve resources and use energy more efficiently. "Low-cost/no-cost" upgrades can be worked into a capital plan that provides a 3-…
40 CFR 35.935-17 - Training facility.
Code of Federal Regulations, 2011 CFR
2011-07-01
... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...
40 CFR 35.935-17 - Training facility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...
Searching for Solutions. A Citizen's Guide to Hazardous Waste Management in Ohio.
ERIC Educational Resources Information Center
Clapham, Pete, Comp.
This guide was developed to promote responsible hazardous waste management by Ohio citizens, citizens who are interested in upgrading operations of existing waste facilities, oppose the development of any new landfills, and those who promote the establishment of modern, efficient facilities. Information is presented in six chapters. The hazardous…
NASA Technical Reports Server (NTRS)
Thomas, Scott R.; Trefny, Charles J.; Pack, William D.
1995-01-01
The NASA Lewis Research Center's Hypersonic Tunnel Facility (HTF) is a free-jet, blowdown propulsion test facility that can simulate up to Mach-7 flight conditions with true air composition. Mach-5, -6, and -7 nozzles, each with a 42 inch exit diameter, are available. Previously obtained calibration data indicate that the test flow uniformity of the HTF is good. The facility, without modifications, can accommodate models approximately 10 feet long. The test gas is heated using a graphite core induction heater that generates a nonvitiated flow. The combination of clean-air, large-scale, and Mach-7 capabilities is unique to the HTF and enables an accurate propulsion performance determination. The reactivation of the HTF, in progress since 1990, includes refurbishing the graphite heater, the steam generation plant, the gaseous oxygen system, and all control systems. All systems were checked out and recertified, and environmental systems were upgraded to meet current standards. The data systems were also upgraded to current standards and a communication link with NASA-wide computers was added. In May 1994, the reactivation was complete, and an integrated systems test was conducted to verify facility operability. This paper describes the reactivation, the facility status, the operating capabilities, and specific applications of the HTF.
Experimental investigation of nozzle/plume aerodynamics at hypersonic speeds
NASA Technical Reports Server (NTRS)
Bogdanoff, David W.; Cambier, Jean-Luc; Papadopoulos, Perikles
1994-01-01
Much of the work involved the Ames 16-Inch Shock Tunnel facility. The facility was reactivated and upgraded, a data acquisition system was configured and upgraded several times, several facility calibrations were performed and test entries with a wedge model with hydrogen injection and a full scramjet combustor model, with hydrogen injection, were performed. Extensive CFD modeling of the flow in the facility was done. This includes modeling of the unsteady flow in the driver and driven tubes and steady flow modeling of the nozzle flow. Other modeling efforts include simulations of non-equilibrium flows and turbulence, plasmas, light gas guns and the use of non-ideal gas equations of state. New experimental techniques to improve the performance of gas guns, shock tubes and tunnels and scramjet combustors were conceived and studied computationally. Ways to improve scramjet engine performance using steady and pulsed detonation waves were also studied computationally. A number of studies were performed on the operation of the ram accelerator, including investigations of in-tube gasdynamic heating and the use of high explosives to raise the velocity capability of the device.
The capabilities of monochromatic EC neutrino beams with the SPS upgrade
NASA Astrophysics Data System (ADS)
Espinoza, C.; Bernabéu, J.
2008-05-01
The goal for future neutrino facilities is the determination of the U(e3) mixing and CP violation in neutrino oscillations. This will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We conclude that the SPS upgrade to 1000 GeV is crucial to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline. We compare the physics potential for two different configurations: I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. The main conclusion is that, whereas the gain in the determination of U(e3) is rather modest, setup II provides much better sensitivity to CP violation.
The CERN-EU high-energy Reference Field (CERF) facility: applications and latest developments
NASA Astrophysics Data System (ADS)
Silari, Marco; Pozzi, Fabio
2017-09-01
The CERF facility at CERN provides an almost unique high-energy workplace reference radiation field for the calibration and test of radiation protection instrumentation employed at high-energy accelerator facilities and for aircraft and space dosimetry. This paper describes the main features of the facility and supplies a non-exhaustive list of recent (as of 2005) applications for which CERF is used. Upgrade work started in 2015 to provide the scientific and industrial communities with a state-of-the-art reference facility is also discussed.
NASA Technical Reports Server (NTRS)
1994-01-01
This study provides a set of recommendations for improving the effectiveness of our nation's aeronautics and space facilities. The study plan considers current and future government and commercial needs as well as DOD and NASA mission requirements through the year 2023. It addresses shortfalls in existing capabilities, new facility requirements, upgrades, consolidations, and phase-out of existing facilities. If the recommendations are implemented, they will provide world-class capability where it is vital to our country's needs and make us more efficient in meeting future needs.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
..., and local agencies, as well as interested individuals, are invited and encouraged to review and... distributed to the following libraries and publicly accessible facilities for public review: 1. San Francisco..., 1360 Holloway Avenue, San Francisco, CA 94132. 3. Hastings Law Library, UC Hastings College of the Law...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... nuclear power plants, but noted that the Commission's regulations provide mechanisms for individual.... Borchardt (NRC) to M. S. Fertel (Nuclear Energy Institute) dated June 4, 2009. The licensee's request for an... effect. The facility consists of two pressurized-water reactors located in San Diego County, California...
NASA Astrophysics Data System (ADS)
Iliopoulou, E.; Bamidis, P.; Brugger, M.; Froeschl, R.; Infantino, A.; Kajimoto, T.; Nakao, N.; Roesler, S.; Sanami, T.; Siountas, A.; Yashima, H.
2018-06-01
The CERN High energy AcceleRator Mixed field (CHARM) facility is situated in the CERN Proton Synchrotron (PS) East Experimental Area. The facility receives a pulsed proton beam from the CERN PS with a beam momentum of 24 GeV/c with 5·1011 protons per pulse with a pulse length of 350 ms and with a maximum average beam intensity of 6.7·1010 protons per second. The extracted proton beam impacts on a cylindrical copper target. The shielding of the CHARM facility includes the CERN Shielding Benchmark Facility (CSBF) situated laterally above the target that allows deep shielding penetration benchmark studies of various shielding materials. This facility has been significantly upgraded during the extended technical stop at the beginning of 2016. It consists now of 40 cm of cast iron shielding, a 200 cm long removable sample holder concrete block with 3 inserts for activation samples, a material test location that is used for the measurement of the attenuation length for different shielding materials as well as for sample activation at different thicknesses of the shielding materials. Activation samples of bismuth, aluminium and indium were placed in the CSBF in September 2016 to characterize the upgraded version of the CSBF. Monte Carlo simulations with the FLUKA code have been performed to estimate the specific production yields of bismuth isotopes (206 Bi, 205 Bi, 204 Bi, 203 Bi, 202 Bi, 201 Bi) from 209 Bi, 24 Na from 27 Al and 115 m I from 115 I for these samples. The production yields estimated by FLUKA Monte Carlo simulations are compared to the production yields obtained from γ-spectroscopy measurements of the samples taking the beam intensity profile into account. The agreement between FLUKA predictions and γ-spectroscopy measurements for the production yields is at a level of a factor of 2.
Status of the ATF Damping Ring BPM Upgrade Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Briegel, C.; /Fermilab; Eddy, N.
2011-12-01
A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it'smore » finalization are presented.« less
The upgraded Large Plasma Device, a machine for studying frontier basic plasma physics.
Gekelman, W; Pribyl, P; Lucky, Z; Drandell, M; Leneman, D; Maggs, J; Vincena, S; Van Compernolle, B; Tripathi, S K P; Morales, G; Carter, T A; Wang, Y; DeHaas, T
2016-02-01
In 1991 a manuscript describing an instrument for studying magnetized plasmas was published in this journal. The Large Plasma Device (LAPD) was upgraded in 2001 and has become a national user facility for the study of basic plasma physics. The upgrade as well as diagnostics introduced since then has significantly changed the capabilities of the device. All references to the machine still quote the original RSI paper, which at this time is not appropriate. In this work, the properties of the updated LAPD are presented. The strategy of the machine construction, the available diagnostics, the parameters available for experiments, as well as illustrations of several experiments are presented here.
LLE Review Quarterly Report (April-June 1989). Volume 39
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simon, A.
1989-06-01
This volume of the LLE Review, covering the period April-June 1989, includes the second part of a two-part series dealing with the preliminary design of the OMEGA Upgrade. One article provides a general overview of the current upgrade system configuration and another article describes the target system. Future issues of the LLE Review will cover other aspects of the OMEGA Upgrade as the detailed system design develops. In addition, the advanced technology section of this issue contains an article discussing the interaction of a picosecond optical pulse with high temperature superconductors. Finally, the activities of the National Laser Users Facilitymore » and the GDL and OMEGA laser facilities are summarized.« less
Travel by public transit to mammography facilities in 6 US urban areas.
Graham, S; Lewis, B; Flanagan, B; Watson, M; Peipins, L
2015-12-01
We examined lack of private vehicle access and 30 minutes or longer public transportation travel time to mammography facilities for women 40 years of age or older in the urban areas of Boston, Philadelphia, San Antonio, San Diego, Denver, and Seattle to identify transit marginalized populations - women for whom these travel characteristics may jointly present a barrier to clinic access. This ecological study used sex and race/ethnicity data from the 2010 US Census and household vehicle availability data from the American Community Survey 2008-2012, all at Census tract level. Using the public transportation option on Google Trip Planner we obtained the travel time from the centroid of each census tract to all local mammography facilities to determine the nearest mammography facility in each urban area. Median travel times by public transportation to the nearest facility for women with no household access to a private vehicle were obtained by ranking travel time by population group across all U.S. census tracts in each urban area and across the entire study area. The overall median travel times for each urban area for women without household access to a private vehicle ranged from a low of 15 minutes in Boston and Philadelphia to 27 minutes in San Diego. The numbers and percentages of transit marginalized women were then calculated for all urban areas by population group. While black women were less likely to have private vehicle access, and both Hispanic and black women were more likely to be transit marginalized, this outcome varied by urban area. White women constituted the largest number of transit marginalized. Our results indicate that mammography facilities are favorably located for the large majority of women, although there are still substantial numbers for whom travel may likely present a barrier to mammography facility access.
The Pegasus-Upgrade Experiment
NASA Astrophysics Data System (ADS)
Fonck, R. J.; Bongard, M. W.; Barr, J. L.; Frerichs, H. G.; Lewicki, B. T.; Reusch, J. A.; Schmitz, O.; Winz, G. R.
2015-11-01
Tokamak operation at near-unity aspect ratio provides access to advanced tokamak physics at modest parameters. High plasma current is accessible at very low toroidal field. This offers H-mode performance at Te levels that allow use of electrostatic and magnetic probe arrays through the edge pedestal region into the plasma core. An upgrade to the Pegasus ST is planned to exploit these features and pursue unique studies in three areas: local measurements of pedestal and ELM dynamics at Alfvenic timescales; direct measurement of the local plasma response to application of 3D magnetic perturbations with high spectral flexibility; and extension of Local Helicity Injection for nonsolenoidal startup to NSTX-U-relevant confinement and stability regimes. Significant but relatively low-cost upgrades to the facility are proposed: a new centerstack with larger solenoid and 2x the number of toroidal field conductors; a new TF power supply and conversion of the 200 MVA OH power supply to a cascaded multilevel inverter configuration; and installation of an extensive 3D-magnetic perturbation coil system for ELM mitigation and suppression studies. The upgraded facility will provide 0.3 MA plasmas with pulse lengths of 50-100 msec flattop, aspect ratio <1.25, and toroidal field up to 0.4 T. These research activities will be integrated into related efforts on DIII-D and NSTX-U. Work supported by US DOE grant DE-FG02-96ER54375.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
..., closures and coils, from graphic arts operations, from the provision of sampling and testing facilities... Provision of Sampling and Revised 03/21/01....... 05/31/01 Testing Facilities. AVAQMD 1168 Adhesive and... District (1) Rule 205, ``Provision of Sampling and Testing Facilities,'' revised on March 21, 2001...
40 CFR 35.2152 - Federal share.
Code of Federal Regulations, 2010 CFR
2010-07-01
... a primary, secondary, or advanced treatment facility or its interceptors, or infiltration/inflow... works required to train and upgrade waste treatment works operations and maintenance personnel may be up...
40 CFR 35.2152 - Federal share.
Code of Federal Regulations, 2011 CFR
2011-07-01
... a primary, secondary, or advanced treatment facility or its interceptors, or infiltration/inflow... works required to train and upgrade waste treatment works operations and maintenance personnel may be up...
Developments towards the LHCb VELO upgrade
NASA Astrophysics Data System (ADS)
Cid Vidal, Xabier
2016-09-01
The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019-2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb-1. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign.
Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Phase II Upgrade Activities
NASA Technical Reports Server (NTRS)
Emrich, William J.; Moran, Robert P.; Pearson, J. Bose
2013-01-01
To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities. Keywords: Nuclear Thermal Propulsion, Simulator
NETL- Severe Environment Corrosion Erosion Facility
None
2018-01-16
NETL's Severe Environment Corrosion Erosion Facility in Albany studies how new and old materials will stand up to new operating conditions. Work done in the lab supports NETL's oxy-fuel combustion oxidation work, refractory materials stability work, and the fuels program, in particular the hydrogen membrane materials stability work, to determine how best to upgrade existing power plants.
Design Principles of an Open Agent Architecture for Web-Based Learning Community.
ERIC Educational Resources Information Center
Jin, Qun; Ma, Jianhua; Huang, Runhe; Shih, Timothy K.
A Web-based learning community involves much more than putting learning materials into a Web site. It can be seen as a complex virtual organization involved with people, facilities, and cyber-environment. Tremendous work and manpower for maintaining, upgrading, and managing facilities and the cyber-environment are required. There is presented an…
78 FR 29289 - Safety Zone; Big Bay Boom, San Diego Bay, San Diego, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-20
... provide for the safety of the crew, spectators, and other users and vessels of the waterway. Persons and... submit comments by mail and would like to know that they reached the Facility, please enclose a stamped... Independence Day Fireworks Display. The safety zones will include all navigable waters within 1,000 feet of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-16
... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [S-107-2012] Foreign-Trade Zone 61--San Juan, PR, Application for Subzone, Coamo Property & Investments, LLC, Coamo, PR An application has been submitted to the..., requesting special-purpose subzone status for the facility of Coamo Property & Investments, LLC, located in...
75 FR 28194 - Safety Zone; San Clemente 3 NM Safety Zone, San Clemente Island, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-20
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2009-0277] RIN 1625... inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West... 1934, Executive Order 6897 transferred full ownership of SCI from the Department of Commerce to the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [S-138-2012] Foreign-Trade Zone 61--San Juan, Puerto Rico; Application for Subzone; Sea World, Inc.; Guaynabo, PR An application has been submitted to..., requesting special-purpose subzone status for the facility of Sea World, Inc., located in Guaynabo, Puerto...
Navajo Tribal Utility Authority Shiprock Wastewater Treatment Facility; Draft NPDES Permit
EPA is proposing to issue a NPDES permit (No. NN0020621) to Navajo Tribal Utility Authority (NTUA) for the Shiprock wastewater treatment facility in San Juan County, New Mexico, within the northeastern portion of the Navajo Nation.
US-CERT Control System Center Input/Output (I/O) Conceputal Design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2005-02-01
This document was prepared for the US-CERT Control Systems Center of the National Cyber Security Division (NCSD) of the Department of Homeland Security (DHS). DHS has been tasked under the Homeland Security Act of 2002 to coordinate the overall national effort to enhance the protection of the national critical infrastructure. Homeland Security Presidential Directive HSPD-7 directs the federal departments to identify and prioritize critical infrastructure and protect it from terrorist attack. The US-CERT National Strategy for Control Systems Security was prepared by the NCSD to address the control system security component addressed in the National Strategy to Secure Cyberspace andmore » the National Strategy for the Physical Protection of Critical Infrastructures and Key Assets. The US-CERT National Strategy for Control Systems Security identified five high-level strategic goals for improving cyber security of control systems; the I/O upgrade described in this document supports these goals. The vulnerability assessment Test Bed, located in the Information Operations Research Center (IORC) facility at Idaho National Laboratory (INL), consists of a cyber test facility integrated with multiple test beds that simulate the nation's critical infrastructure. The fundamental mission of the Test Bed is to provide industry owner/operators, system vendors, and multi-agency partners of the INL National Security Division a platform for vulnerability assessments of control systems. The Input/Output (I/O) upgrade to the Test Bed (see Work Package 3.1 of the FY-05 Annual Work Plan) will provide for the expansion of assessment capabilities within the IORC facility. It will also provide capabilities to connect test beds within the Test Range and other Laboratory resources. This will allow real time I/O data input and communication channels for full replications of control systems (Process Control Systems [PCS], Supervisory Control and Data Acquisition Systems [SCADA], and components). This will be accomplished through the design and implementation of a modular infrastructure of control system, communications, networking, computing and associated equipment, and measurement/control devices. The architecture upgrade will provide a flexible patching system providing a quick ''plug and play''configuration through various communication paths to gain access to live I/O running over specific protocols. This will allow for in-depth assessments of control systems in a true-to-life environment. The full I/O upgrade will be completed through a two-phased approach. Phase I, funded by DHS, expands the capabilities of the Test Bed by developing an operational control system in two functional areas, the Science & Technology Applications Research (STAR) Facility and the expansion of various portions of the Test Bed. Phase II (see Appendix A), funded by other programs, will complete the full I/O upgrade to the facility.« less
7 CFR 1740.6 - Eligible purposes of grants.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., translators, and repeaters, including all facilities required to initiate DTV broadcasting. All broadcast... transmitters or translators that may be included in an application; (b) Power upgrades of existing DTV...
San Francisco and Bay Area, CA, USA
1973-06-22
SL2-03-118 (June 1973) --- An infrared photograph of the San Francisco Bay, California area, taken from the Skylab 1/2 space station in Earth orbit. THE PICTURE SHOULD BE HELD WITH THE CLOUDS AND PACIFIC OCEAN ON THE LEFT. This photograph was taken by one of the six lenses of the Itek-furnished S190-A Multispectral Photographic Facility Experiment in the Multiple Docking Adapter of the space station. Type 2443 film was used. Note the thickly populated and highly developed area around the bay. Among the cities visible in this photograph are San Francisco, Oakland, Berkeley and San Jose. This view extends eastward to show a portion of the San Joaquin Valley. The S190-A experiment is part of the Skylab Earth Resources Experiment Package (EREP). Photo credit: NASA
Recent Results from ISOLDE and HIE-ISOLDE
NASA Astrophysics Data System (ADS)
Borge, María J. G.
2018-02-01
ISOLDE is the CERN facility dedicated to the production of rare ion beams for many different experiments in the fields of nuclear and atomic physics, materials science and life sciences. The HIE-ISOLDE, Higher Intensity and Energy upgrade has finished its stage 1 dedicated to upgrade the energy up to 5.5 MeV/u, producing the first radioactive beams with this energy in September 9th 2016. Recent results from the low energy and post-accelerated beams are given in this contribution.
2000-05-02
Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park
2000-05-02
Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park
San Marco D/L Post Launch Report No. 2
NASA Technical Reports Server (NTRS)
1988-01-01
The San Marco D/L spacecraft, utilizing a NASA supplied Scout expendable launch vehicle, was launched fran the San Marco Range, located off the coast of Kenya, Africa, on March 25, 1988 at 19:50 GMT. The launch was conducted by an Italian crew assisted by LaRC and LTV personnel. The San Marco D/L was the fifth in a series of Italian and United States satellites. The purpose of the mission is to explore the relationship between solar activity and the physics of the equatorial thermosphere and ionosphere. Information now being collected will augment, and be used in correlation with, data and information obtained from ground based facilities and other satellites.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, Lisa; Lekov, Alex; McKane, Aimee
2010-08-20
This case study enhances the understanding of open automated demand response opportunities in municipal wastewater treatment facilities. The report summarizes the findings of a 100 day submetering project at the San Luis Rey Wastewater Treatment Plant, a municipal wastewater treatment facility in Oceanside, California. The report reveals that key energy-intensive equipment such as pumps and centrifuges can be targeted for large load reductions. Demand response tests on the effluent pumps resulted a 300 kW load reduction and tests on centrifuges resulted in a 40 kW load reduction. Although tests on the facility?s blowers resulted in peak period load reductions ofmore » 78 kW sharp, short-lived increases in the turbidity of the wastewater effluent were experienced within 24 hours of the test. The results of these tests, which were conducted on blowers without variable speed drive capability, would not be acceptable and warrant further study. This study finds that wastewater treatment facilities have significant open automated demand response potential. However, limiting factors to implementing demand response are the reaction of effluent turbidity to reduced aeration load, along with the cogeneration capabilities of municipal facilities, including existing power purchase agreements and utility receptiveness to purchasing electricity from cogeneration facilities.« less
Energy Efficiency Through Lighting Upgrades
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berst, Kara; Howeth, Maria
2013-02-26
Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year's average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center;more » both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.« less
NASA Astrophysics Data System (ADS)
Medina Hernandez, Carlos Francisco
The two largest observatories in the world dedicated to the study of Ultra High Energy Cosmic Rays (UHECR) are the Pierre Auger Observatory (Auger) in Mendoza, Argentina and the Telescope Array (TA) in Utah, USA. The measurements of the cosmic ray flux by Auger and TA present a discrepancy at the highest part of the energy spectrum. In this thesis, I study if this discrepancy can be attributed to instrumental effects related to the measurements of the atmospheric aerosol contents in Auger. The Auger Fluorescence Detector (FD) measures the scattered light from laser tracks generated by the Central Laser Facility (CLF) and the eXtreme Laser Facility (XLF) located near the center of Auger, to estimate the vertical aerosol optical depth (tau (z,t)). A good knowledge of tau (z,t) is needed to obtain unbiased and reliable FD measurements of the energy of the UHECR primary particle. The CLF was upgraded substantially in 2013 to improve laser reliability. A substantial part of my Ph.D work is dedicated to building, maintaining and analyzing data from this upgraded facility. The upgraded CLF includes a backscatter Raman LIDAR which independently measures tau (z,t). For the first time in a cosmic ray experiment, two years of measurements of tau (z,t) obtained with the Raman LIDAR are compared with the measurements obtained with the FD. Based on these comparisons, an alternative atmospheric database was created to study its effects on the measurements of the flux as a function of energy. The resulting energy spectrum plot is found to be more compatible with the energy spectrum plot released by TA.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [S-65-2013] Foreign-Trade Zone 61--San Juan, Puerto Rico Application for Subzone, Parapiezas Corporation Amendment of Application The Puerto Rico Trade & Export Company, grantee of FTZ 61, has amended its application requesting subzone status for the facility of Parapiezas Corporation (78 FR 28800...
Infrastructure optimisation via MBR retrofit: a design guide.
Bagg, W K
2009-01-01
Wastewater management is continually evolving with the development and implementation of new, more efficient technologies. One of these is the Membrane Bioreactor (MBR). Although a relatively new technology in Australia, MBR wastewater treatment has been widely used elsewhere for over 20 years, with thousands of MBRs now in operation worldwide. Over the past 5 years, MBR technology has been enthusiastically embraced in Australia as a potential treatment upgrade option, and via retrofit typically offers two major benefits: (1) more capacity using mostly existing facilities, and (2) very high quality treated effluent. However, infrastructure optimisation via MBR retrofit is not a simple or low-cost solution and there are many factors which should be carefully evaluated before deciding on this method of plant upgrade. The paper reviews a range of design parameters which should be carefully evaluated when considering an MBR retrofit solution. Several actual and conceptual case studies are considered to demonstrate both advantages and disadvantages. Whilst optimising existing facilities and production of high quality water for reuse are powerful drivers, it is suggested that MBRs are perhaps not always the most sustainable Whole-of-Life solution for a wastewater treatment plant upgrade, especially by way of a retrofit.
Compliance with federal and state legislation by indoor tanning facilities in San Diego.
Culley, C A; Mayer, J A; Eckhardt, L; Busic, A J; Eichenfield, L F; Sallis, J F; Quintana, P J; Woodruff, S I
2001-01-01
The prevalence rates of both skin cancers and indoor tanning among the US population are high and have increased substantially in recent years. Low compliance by indoor tanning facilities with safety regulations may place consumers at greater risk of skin and ocular damage. This study quantified the level of compliance by indoor tanning facilities with selected federal and state regulations and recommendations. Tanning facilities (N = 54) in San Diego County, California, were visited by a confederate posing as a prospective customer. Compliance with 13 regulations/recommendations were assessed by either direct query or observation of the presence/absence of signs and warning labels. Operators' responses to 5 risk-based questions also were noted. No facility complied with all 13 regulations/recommendations. Compliance with 3 protective eyewear regulations was high (89%-100%). In contrast, compliance with maximum tanning frequency recommendations (approximately 6%) and parental consent regulations (approximately 43%) was disturbingly low. The investigators recommend instituting mandatory, comprehensive training for operators, as well as systematic compliance monitoring with enforcement of penalties for noncompliance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shimada, M.; Taylor, C. N.; Pawelko, R. J.
2016-04-01
The Tritium Plasma Experiment (TPE) is a unique high-flux linear plasma device that can handle beryllium, tritium, and neutron-irradiated plasma facing materials, and is the only existing device dedicated to directly study tritium retention and permeation in neutron-irradiated materials with tritium [M. Shimada et.al., Rev. Sci. Instru. 82 (2011) 083503 and and M. Shimada, et.al., Nucl. Fusion 55 (2015) 013008]. The plasma-material-interaction (PMI) determines a boundary condition for diffusing tritium into bulk PFCs, and the tritium PMI is crucial for enhancing fundamental sciences that dictate tritium fuel cycles and safety and are high importance to an FNSF and DEMO. Recentlymore » the TPE has undergone major upgrades in its electrical and control systems. New DC power supplies and a new control center enable remote plasma operations from outside of the contamination area for tritium, minimizing the possible exposure risk with tritium and beryllium. We discuss the electrical upgrade, enhanced operational safety, improved plasma performance, and development of optical spectrometer system. This upgrade not only improves operational safety of the worker, but also enhances plasma performance to better simulate extreme plasma-material conditions expected in ITER, Fusion Nuclear Science Facility (FNSF), and Demonstration reactor (DEMO). This work was prepared for the U.S. Department of Energy, Office of Fusion Energy Sciences, under the DOE Idaho Field Office contract number DE-AC07-05ID14517.« less
ERIC Educational Resources Information Center
Ephron, Hazel; Bishop, Walter
2001-01-01
Explains why upgrading a school's pools can help reduce maintenance costs and make safer facilities. Three top engineering issues in older pools are addressed: recirculation, filtration, and dehumidification. Concluding comments discuss procedures for establishing safe swimming. (GR)
The Telecommunications and Data Aquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1983-01-01
Tracking and ground-based navigation techniques are discussed in relation to DSN advanced systems. Network data processing and productivity are studied to improve management planning methods. Project activities for upgrading DSN facilities are presented.
MSE observatory: a revised and optimized astronomical facility
NASA Astrophysics Data System (ADS)
Bauman, Steven E.; Angers, Mathieu; Benedict, Tom; Crampton, David; Flagey, Nicolas; Gedig, Mike; Green, Greg; Liu, Andy; Lo, David; Loewen, Nathan; McConnachie, Alan; Murowinski, Rick; Racine, René; Salmon, Derrick; Stiemer, Siegfried; Szeto, Kei; Wu, Di
2016-07-01
The Canada-France-Hawaii-Telescope Corporation (CFHT) plans to repurpose its observatory on the summit of Maunakea and operate a (60 segment) 11.25m aperture wide field spectroscopic survey telescope, the Maunakea Spectroscopic Explorer (MSE). The prime focus telescope will be equipped with dedicated instrumentation to take advantage of one of the best sites in the northern hemisphere and offer its users the ability to perform large surveys. Central themes of the development plan are reusing and upgrading wherever possible. MSE will reuse the CFHT site and build upon the existing observatory infrastructure, using the same building and telescope pier as CFHT, while minimizing environmental impact on the summit. MSE will require structural support upgrades to the building to meet the latest building seismic code requirements and accommodate a new larger telescope and upgraded enclosure. It will be necessary to replace the current dome since a larger slit opening is needed for a larger telescope. MSE will use a thermal management system to remove heat generated by loads from the building, flush excess heat from lower levels, and maintain the observing environment temperature. This paper describes the design approach for redeveloping the CFHT facility for MSE. Once the project is completed the new facility will be almost indistinguishable on the outside from the current CFHT observatory. Past experience and lessons learned from CFHT staff and the astronomical community will be used to create a modern, optimized, and transformative scientific data collecting machine.
Research and the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Control System Upgrade for a Mass Property Measurement Facility
NASA Technical Reports Server (NTRS)
Chambers, William; Hinkle, R. Kenneth (Technical Monitor)
2002-01-01
The Mass Property Measurement Facility (MPMF) at the Goddard Space Flight Center has undergone modifications to ensure the safety of Flight Payloads and the measurement facility. The MPMF has been technically updated to improve reliability and increase the accuracy of the measurements. Modifications include the replacement of outdated electronics with a computer based software control system, the addition of a secondary gas supply in case of a catastrophic failure to the gas supply and a motor controlled emergency stopping feature instead of a hard stop.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burdick, A.
This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVACmore » companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.« less
Diarrhea Outbreak During U.S. Military Training In El Salvador
2012-07-01
Brigade (MEB) were detached to the Base Poligono in San Vicente, El Salvador as part of a military training and humanitarian assistance mission. The... Poligono included tent city (living quarters), latrines, hygiene facilities, the potable water distribution system, dining facility (DFAC), on-base vendor
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... construction, operation, and maintenance of utility infrastructure upgrades, expansions, and improvements... and wastewater facilities and road improvements to Range 130. All practical means to avoid or minimize...
1973-06-01
SL2-04-118 (June 1973) --- A color photograph of the San Francisco Bay, California area, taken from the Skylab space station in Earth orbit. (The picture should be held with the clouds and Pacific Ocean on the left.) Note the thickly populated and highly developed area around the bay. Among the cities visible are San Francisco, Oakland, Berkeley and San Jose. This view extends eastward to show a portion of the San Joaquin Valley. This photograph was taken by one of the six lenses of the Itek-furnished S190-A Multispectral Photographic Facility Experiment in the Multiple Docking Adapter of the space station. Type SO-356 film was used. The S190-A experiment is part of the Skylab Earth Resources Experiments Package (EREP). Photo credit: NASA
Oltmann, Richard N.
1998-01-01
Tidal flows were measured using acoustic Doppler current profilers and ultrasonic velocity meters during spring 1996 and 1997 in south Sacramento-San Joaquin Delta, California, when (1) a temporary barrier was installed at the head of Old River to prevent the entrance of migrating San Joaquin River salmon smolts, (2) the rate of water export from the south Delta was reduced for an extended period of time, and (3) a 30-day pulse flow was created on the San Joaquin River to move salmon smolts north away from the export facilities during spring 1997. Tracer-dye measurements also were made under these three conditions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woollett, J J
2008-09-18
The purpose of this report is to present the results of a live-trapping and visual surveys for special status reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory (LLNL). The survey was conducted under the authority of the Federal recovery permit of Swaim Biological Consulting (PRT-815537) and a Memorandum of Understanding issued from the California Department of Fish and Game. Site 300 is located between Livermore and Tracy just north of Tesla road (Alameda County) and Corral Hollow Road (San Joaquin County) and straddles the Alameda and San Joaquin County line (Figures 1 and 2). It encompasses portionsmore » of the USGS 7.5 minute Midway and Tracy quadrangles (Figure 2). Focused surveys were conducted for four special status reptiles including the Alameda whipsnake (Masticophis lateralis euryxanthus), the San Joaquin Whipsnake (Masticophis Hagellum ruddock), the silvery legless lizard (Anniella pulchra pulchra), and the California horned lizard (Phrynosoma coronanum frontale).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rothman, E.Z.
1995-05-01
This report is a summary of activities carried out at the National Synchrotron Light Source during 1994. It consists of sections which summarize the work carried out in differing scientific disciplines, meetings and workshops, operations experience of the facility, projects undertaken for upgrades, administrative reports, and collections of abstracts and publications generated from work done at the facility.
Simulation models and designs for advanced Fischer-Tropsch technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choi, G.N.; Kramer, S.J.; Tam, S.S.
1995-12-31
Process designs and economics were developed for three grass-roots indirect Fischer-Tropsch coal liquefaction facilities. A baseline and an alternate upgrading design were developed for a mine-mouth plant located in southern Illinois using Illinois No. 6 coal, and one for a mine-mouth plane located in Wyoming using Power River Basin coal. The alternate design used close-coupled ZSM-5 reactors to upgrade the vapor stream leaving the Fischer-Tropsch reactor. ASPEN process simulation models were developed for all three designs. These results have been reported previously. In this study, the ASPEN process simulation model was enhanced to improve the vapor/liquid equilibrium calculations for themore » products leaving the slurry bed Fischer-Tropsch reactors. This significantly improved the predictions for the alternate ZSM-5 upgrading design. Another model was developed for the Wyoming coal case using ZSM-5 upgrading of the Fischer-Tropsch reactor vapors. To date, this is the best indirect coal liquefaction case. Sensitivity studies showed that additional cost reductions are possible.« less
Engagement and Legacy: A Profile of President Bill Elvey
ERIC Educational Resources Information Center
Dessoff, Alan
2008-01-01
When Bill Elvey became APPA's new President at the association's conference in San Antonio in July, he was at home in more ways than one. A native Texan, he grew up in San Antonio and met his wife-to-be there--in the seventh grade. Last fall, after an absence of 31 years, he came back to Texas as director of facilities management at the University…
Pixel sensors with slim edges and small pitches for the CMS upgrades for HL-LHC
Vernieri, Caterina; Bolla, Gino; Rivera, Ryan; ...
2016-06-07
Here, planar n-in-n silicon detectors with small pitches and slim edges are being investigated for the innermost layers of tracking devices for the foreseen upgrades of the LHC experiments. Sensor prototypes compatible with the CMS readout, fabricated by Sintef, were tested in the laboratory and with a 120 GeV/c proton beam at the Fermilab test beam facility before and after irradiation with up to 2 × 10 15 neq/cm 2 fluence. Preliminary results of the data analysis are presented.
2014-04-24
CAPE CANAVERAL, Fla. – Modifications continue on the Multi-Payload Processing Facility, or MPPF, at NASA's Kennedy Space Center in Florida. Inside the high bay, Skip Williams, Ground Systems Development and Operations, or GSDO, deputy project manager for the spacecraft offline element integration team, points out artist illustrations of how the MPPF's interior and exterior will look after modifications and upgrades have been completed. Kennedy's Center Operations Directorate is overseeing upgrades to the MPPF for GSDO Program. The extensive upgrades and modernizations will support processing of Orion spacecraft for NASA's exploration missions. The 19,647-square-foot building, originally constructed in 1995, primarily will be used for Orion hypergolic fueling, ammonia servicing and high-pressure gas servicing and checkout before being transported to the Vehicle Assembly Building for integration with the Space Launch System. Photo credit: NASA/Daniel Casper
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goggio Borgeson, Merrian; Zimring, Mark
This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. This guide explicitly focuses on comprehensive energy upgrades, those that involve multiple measures and are targeted toward achieving significant energy savings. Successful implementation of clean energy upgrades in schools is a matter of understanding the opportunity, making the commitment, and creatively tapping into available financing. This guide attempts to provide the foundation needed for successful projects in U.S. schools. It walks through the financing options available to K-12 schools and provides casemore » studies of six school districts from around the country.« less
Travel by public transit to mammography facilities in 6 US urban areas
Graham, S; Lewis, B; Flanagan, B; Watson, M; Peipins, L
2017-01-01
We examined lack of private vehicle access and 30 minutes or longer public transportation travel time to mammography facilities for women 40 years of age or older in the urban areas of Boston, Philadelphia, San Antonio, San Diego, Denver, and Seattle to identify transit marginalized populations - women for whom these travel characteristics may jointly present a barrier to clinic access. This ecological study used sex and race/ethnicity data from the 2010 US Census and household vehicle availability data from the American Community Survey 2008–2012, all at Census tract level. Using the public transportation option on Google Trip Planner we obtained the travel time from the centroid of each census tract to all local mammography facilities to determine the nearest mammography facility in each urban area. Median travel times by public transportation to the nearest facility for women with no household access to a private vehicle were obtained by ranking travel time by population group across all U.S. census tracts in each urban area and across the entire study area. The overall median travel times for each urban area for women without household access to a private vehicle ranged from a low of 15 minutes in Boston and Philadelphia to 27 minutes in San Diego. The numbers and percentages of transit marginalized women were then calculated for all urban areas by population group. While black women were less likely to have private vehicle access, and both Hispanic and black women were more likely to be transit marginalized, this outcome varied by urban area. White women constituted the largest number of transit marginalized. Our results indicate that mammography facilities are favorably located for the large majority of women, although there are still substantial numbers for whom travel may likely present a barrier to mammography facility access. PMID:29285434
Control console replacement at the WPI Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
2001-06-01
B12 6. Former Wood Treatment Facility, Sonoma County , CA . . . . . . . . . . . . . . . . . . . . . B12 7. San Francisco Bay Sites, CA...aromatic hydrocarbons (PAHs) to below regulatory limits. Site: Former Wood Treatment Facility, Sonoma County , CA Technology: Ozone Summary: An array...manufacturing facility, located in Sonoma County , California (Clayton, 2000b). Primary contaminants are pentachlorophenol (PCP) and creosote (i.e., polycyclic
Effectiveness of Low Temperature Additives for Biodiesel Blends
2012-06-30
Westbrook U.S. Army TARDEC Fuels and Lubricants Research Facility Southwest Research Institute® (SwRI®) San Antonio, TX for U.S. Army TARDEC...INTERIM REPORT TFLRF No. 428 by Steven R. Westbrook U.S. Army TARDEC Fuels and Lubricants Research Facility Southwest Research Institute...Director U.S. Army TARDEC Fuels and Lubricants Research Facility (SwRI®) UNCLASSIFIED UNCLASSIFIED REPORT DOCUMENTATION PAGE Form Approved
NASA Astrophysics Data System (ADS)
Hudnut, K. W.; Given, D.; King, N. E.; Lisowski, M.; Langbein, J. O.; Murray-Moraleda, J. R.; Gomberg, J. S.
2011-12-01
Over the past several years, USGS has developed the infrastructure for integrating real-time GPS with seismic data in order to improve our ability to respond to earthquakes and volcanic activity. As part of this effort, we have tested real-time GPS processing software components , and identified the most robust and scalable options. Simultaneously, additional near-field monitoring stations have been built using a new station design that combines dual-frequency GPS with high quality strong-motion sensors and dataloggers. Several existing stations have been upgraded in this way, using USGS Multi-Hazards Demonstration Project and American Recovery and Reinvestment Act funds in southern California. In particular, existing seismic stations have been augmented by the addition of GPS and vice versa. The focus of new instrumentation as well as datalogger and telemetry upgrades to date has been along the southern San Andreas fault in hopes of 1) capturing a large and potentially damaging rupture in progress and augmenting inputs to earthquake early warning systems, and 2) recovering high quality recordings on scale of large dynamic displacement waveforms, static displacements and immediate and long-term post-seismic transient deformation. Obtaining definitive records of large ground motions close to a large San Andreas or Cascadia rupture (or volcanic activity) would be a fundamentally important contribution to understanding near-source large ground motions and the physics of earthquakes, including the rupture process and friction associated with crack propagation and healing. Soon, telemetry upgrades will be completed in Cascadia and throughout the Plate Boundary Observatory as well. By collaborating with other groups on open-source automation system development, we will be ready to process the newly available real-time GPS data streams and to fold these data in with existing strong-motion and other seismic data. Data from these same stations will also serve the very practical purpose of enabling earthquake early warning and greatly improving rapid finite-fault source modeling. Multiple uses of the effectively very broad-band data obtained by these stations, for operational and research purposes, are bound to occur especially because all data will be freely, openly and instantly available.
DOT National Transportation Integrated Search
2017-02-01
The authors reviewed the literature on planning intermodal transit facilities, extracting recommendations about station and station-area design and land uses, operation of transportation services, and policy actions for station-area planning. They al...
Hazardous Waste Cleanup: Merial Barceloneta, LLC in Barceloneta, Puerto Rico
The Merck, Sharp & Dohme Química de Puerto Rico Ltd (MSDQ) facility is located at Road #2 km. 56.7, in the Municipality of Barceloneta, Puerto Rico. The facility is located approximately three miles south of the Atlantic Ocean and 38 miles due west of San
Long Range Facilities Master Plan: 1986-2000, San Diego Unified School District.
ERIC Educational Resources Information Center
Blair, Billie; And Others
The Long-Range Facilities Master Plan presents solution strategies and financing methods for accommodating a projected student enrollment increase of 45,000 between 1986 and 2000. This increase, plus limited financial resources, school use studies, and recent legislation, necessitated the plan. The issues include housing students, facility…
75 FR 31807 - Federal Property Suitable as Facilities To Assist the Homeless; Republication
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-04
.... Albert Johnson, Department of the Navy, Asset Management Division, Naval Facilities Engineering Command..., and 75A Reasons: Secured Area Bldgs. 3550, 3551 Naval Base San Diego CA Landholding Agency: Navy... Reasons: Secured Area Maine Bldgs. B496 and 497 Bangor Internatl Airport Bangor ME 04401 Landholding...
Documents related to approved request for coverage under the Stone Quarrying, Crushing and Screening Facilities General Permit for Oscar Renda Contracting Inc. Navajo Nation Crushing/Screening Operation located in McKinley and San Juan Counties, NM.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
... Facility Operating License Involving Proposed No Significant Hazards Consideration Determination; San... Operating License No. NPF-10, issued to Southern California Edison (SCE, the licensee), for operation of the... operating conditions'' and ``normal steady state full power operation'' and restricts operation to 70...
The Zadko Telescope: Exploring the Transient Universe
NASA Astrophysics Data System (ADS)
Coward, D. M.; Gendre, B.; Tanga, P.; Turpin, D.; Zadko, J.; Dodson, R.; Devogéle, M.; Howell, E. J.; Kennewell, J. A.; Boër, M.; Klotz, A.; Dornic, D.; Moore, J. A.; Heary, A.
2017-01-01
The Zadko telescope is a 1 m f/4 Cassegrain telescope, situated in the state of Western Australia about 80-km north of Perth. The facility plays a niche role in Australian astronomy, as it is the only meter class facility in Australia dedicated to automated follow-up imaging of alerts or triggers received from different external instruments/detectors spanning the entire electromagnetic spectrum. Furthermore, the location of the facility at a longitude not covered by other meter class facilities provides an important resource for time critical projects. This paper reviews the status of the Zadko facility and science projects since it began robotic operations in March 2010. We report on major upgrades to the infrastructure and equipment (2012-2014) that has resulted in significantly improved robotic operations. Second, we review the core science projects, which include automated rapid follow-up of gamma ray burst (GRB) optical afterglows, imaging of neutrino counterpart candidates from the ANTARES neutrino observatory, photometry of rare (Barbarian) asteroids, supernovae searches in nearby galaxies. Finally, we discuss participation in newly commencing international projects, including the optical follow-up of gravitational wave (GW) candidates from the United States and European GW observatory network and present first tests for very low latency follow-up of fast radio bursts. In the context of these projects, we outline plans for a future upgrade that will optimise the facility for alert triggered imaging from the radio, optical, high-energy, neutrino, and GW bands.
Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1995-01-01
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less
A Data Management Framework for Real-Time Water Quality Monitoring
NASA Astrophysics Data System (ADS)
Mulyono, E.; Yang, D.; Craig, M.
2007-12-01
CSU East Bay operates two in-situ, near-real-time water quality monitoring stations in San Francisco Bay as a member of the Center for Integrative Coastal Ocean Observation, Research, and Education (CICORE) and the Central and Northern California Ocean Observing System (CeNCOOS). We have been operating stations at Dumbarton Pier and San Leandro Marina for the past two years. At each station, a sonde measures seven water quality parameters every six minutes. During the first year of operation, we retrieved data from the sondes every few weeks by visiting the sites and uploading data to a handheld logger. Last year we implemented a telemetry system utilizing a cellular CDMA modem to transfer data from the field to our data center on an hourly basis. Data from each station are initially stored in monthly files in native format. We import data from these files into a SQL database every hour. SQL is handled by Django, an open source web framework. Django provides a user- friendly web user interface (UI) to administer the data. We utilized parts of the Django UI for our database web- front, which allows users to access our database via the World Wide Web and perform basic queries. We also serve our data to other aggregating sites, including the central CICORE website and NOAA's National Data Buoy Center (NDBC). Since Django is written in Python, it allows us to integrate other Python modules into our software, such as the Matplot library for scientific graphics. We store our code in a Subversion repository, which keeps track of software revisions. Code is tested using Python's unittest and doctest modules within Django's testing facility, which warns us when our code modifications cause other parts of the software to break. During the past two years of data acquisition, we have incrementally updated our data model to accommodate changes in physical hardware, including equipment moves, instrument replacements, and sensor upgrades that affected data format.
Environmental Assessment for Basewide Facilities Upgrade at Clear Air Force Station, Alaska
2005-12-01
lividum), alpine sweetvetch (Hedysarum alpinum), cold mountain crazyweed (Oxytropis campestris), silverberry (Elaeagnus commutata), alpine arnica ... Arnica alpina), blue joint grass (Calamagrostis canadensis), large-flowered wintergreen (Pyrola grandiflora), boreal yarrow (Achillea borealis), Siberian
Demonstration of New OLAF Capabilities and Technologies
NASA Astrophysics Data System (ADS)
Kingston, C.; Palmer, E.; Stone, J.; Neese, C.; Mueller, B.
2017-06-01
Upgrades to the On-Line Archiving Facility (OLAF) PDS tool are leading to improved usability and additional functionality by integration of JavaScript web app frameworks. Also included is the capability to upload tabular data as CSV files.
Acquisition of equipment for composite manufacturing laboratory.
DOT National Transportation Integrated Search
2009-12-01
An interdisciplinary team of faculty was formed to upgrade the Composite Manufacturing and Testing Facilities at Missouri S&T. The Metering Unit is useful to manufacture composite pultruded parts using two part polyurethane resin system. Prior to the...
Get More for Your Maintenance Dollar through Contracting.
ERIC Educational Resources Information Center
Donahue, Ron
1983-01-01
The use of contractors for the performance of maintenance duties in parks and recreational facilities is recommended as a legitimate tool to improve productivity or upgrade quality. An example of the use of contracts is provided. (CJ)
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...
47 CFR 27.1164 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...
Tunnel vision for US X-ray free-electron laser
NASA Astrophysics Data System (ADS)
Banks, Michael
2017-03-01
Construction can begin on a major upgrade to the Linac Coherent Light Source (LCLS) at the SLAC National Accelerator Laboratory in the US after the tunnel that will house the facility was cleared of equipment.
77 FR 27797 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... 4279-2) for the following: Applicant/Location: Samoa Cold Storage, Inc. Principal Product/Purpose: The... demolition of the interior of the existing facility, renovations and improvements, repairs and upgrades and...
The PIP-II Conceptual Design Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, M.; Burov, A.; Chase, B.
2017-03-01
The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of themore » Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....« less
An X-Band Gun Test Area at SLAC
DOE Office of Scientific and Technical Information (OSTI.GOV)
Limborg-Deprey, C.; Adolphsen, C.; Chu, T.S.
The X-Band Test Area (XTA) is being assembled in the NLCTA tunnel at SLAC to serve as a test facility for new RF guns. The first gun to be tested will be an upgraded version of the 5.6 cell, 200 MV/m peak field X-band gun designed at SLAC in 2003 for the Compton Scattering experiment run in ASTA. This new version includes some features implemented in 2006 on the LCLS gun such as racetrack couplers, increased mode separation and elliptical irises. These upgrades were developed in collaboration with LLNL since the same gun will be used in an injector formore » a LLNL Gamma-ray Source. Our beamline includes an X-band acceleration section which takes the electron beam up to 100 MeV and an electron beam measurement station. Other X-Band guns such as the UCLA Hybrid gun will be characterized at our facility.« less
Energy dependence of CP-violation reach for monochromatic neutrino beam
NASA Astrophysics Data System (ADS)
Bernabéu, José; Espinoza, Catalina
2008-06-01
The ultimate goal of future neutrino facilities is the determination of CP violation in neutrino oscillations. Besides | U (e 3) | ≠ 0, this will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We compare the physics potential for two different configurations: (I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; (II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. We conclude that the SPS upgrade to 1000 GeV is important to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline.
NASA Technical Reports Server (NTRS)
1988-01-01
ti March 26, 1964, Centro Ricerche Aerospaziali (CRA) successfully launched a two-stage Nike sounding rocket from the Santa Rita launch platform off the Kenya coast, concluding Phase I. It carried basic elements of the San Marco science instrumentation and served further to flight qualify these canponents as well as provide a means of check-out of range instrumentation and equipment. The second phase culminated in the launch of the San Marco-I Spacecraft fran Wallops Island on a Scout vehicle on December 15, 1964. This launch derronstrated the readiness of the CRA launch crews for Phase III operations and qualified the basic spacecraft design. In addition it confirmed the usefulness and reliability of the drag balance device for accurate determinations of air density values and satellite attitude. phase III was completed with the launching of San Marco-11 frcm the San Marco platform off the coast of Kenya on April 26, 1967. ?he San Marco-II carried the same instrunentation as the San Marco-I, but the equatorial orbit permitted a more detailed study to be made of density variations versus altitude in the equatorial region. Ihe successful launch also served to qualify the San Marco Range as a reliable facility for future satellite launches. The successful culmination of the first San Marco endeavor paved the way for still closer collaboration in future space explorations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, R.S.; Diamante, J.M.; Duffey, R.B.
1996-07-01
The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less
DFL, Canada's Space AIT Facilities - Current and Planned Capabilities
NASA Astrophysics Data System (ADS)
Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.
2004-08-01
The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.
Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities
NASA Technical Reports Server (NTRS)
Emrich, William J., Jr.
2014-01-01
Over the past year the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) has been undergoing a significant upgrade beyond its initial configuration. The NTREES facility is designed to perform realistic non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and fuel materials. Although the NTREES facility cannot mimic the neutron and gamma environment of an operating NTR, it can simulate the thermal hydraulic environment within an NTR fuel element to provide critical information on material performance and compatibility. The first phase of the upgrade activities which was completed in 2012 in part consisted of an extensive modification to the hydrogen system to permit computer controlled operations outside the building through the use of pneumatically operated variable position valves. This setup also allows the hydrogen flow rate to be increased to over 200 g/sec and reduced the operation complexity of the system. The second stage of modifications to NTREES which has just been completed expands the capabilities of the facility significantly. In particular, the previous 50 kW induction power supply has been replaced with a 1.2 MW unit which should allow more prototypical fuel element temperatures to be reached. The water cooling system was also upgraded to so as to be capable of removing 100% of the heat generated during. This new setup required that the NTREES vessel be raised onto a platform along with most of its associated gas and vent lines. In this arrangement, the induction heater and water systems are now located underneath the platform. In this new configuration, the 1.2 MW NTREES induction heater will be capable of testing fuel elements and fuel materials in flowing hydrogen at pressures up to 1000 psi at temperatures up to and beyond 3000 K and at near-prototypic reactor channel power densities. NTREES is also capable of testing potential fuel elements with a variety of propellants, including hydrogen with additives to inhibit corrosion of certain potential NTR fuel forms. Additional diagnostic upgrades included in the present NTREES set up include the addition of a gamma ray spectrometer located near the vent filter to detect uranium fuel particles exiting the fuel element in the propellant exhaust stream to provide additional information any material loss occurring during testing. Other aspects of the upgrade included reworking NTREES to reduce the operational complexity of the system despite the increased complexity of the induction heating system. To this end, many of the controls were consolidated on fewer panels. As part of this upgrade activity, the Safety Assessment (SA) and the Standard Operating Procedures (SOPs) for NTREES were extensively rewritten. The new 1.2 MW induction heater consists of three physical units consisting of a transformer, rectifier, and inverter. This multiunit arrangement facilitated increasing the flexibility of the induction heater by more easily allowing variable frequency operation. Frequency ranges between 20 and 60 kHz can be accommodated in the new induction heater allowing more representative power distributions to be generated within the test elements.
Construction. A Report on the Industry
2004-06-01
Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The
Environmental Assessment for a Security Forces Armory/Combat Arms Facility
2005-03-21
tener), Contra Costa goldfields (Lasthenia conjugens), and the San Joaquin spearscale (Atriplex joaquiniana) – that are listed by the California Native...Plant Society as rare. The akali milkvetch and the San Joaquin spearscale are also listed as federal species of concern (Travis AFB, 2002a). The...following federally listed species have been identified at Travis AFB: • Contra Costa goldfields (Lasthenia conjugens), a federally endangered plant
NASA Astrophysics Data System (ADS)
Brown, Duncan
Distributed mobile conversion facilities using either fast pyrolysis or torrefaction processes can be used to convert forest residues to more energy dense substances (bio-oil, bio-slurry or torrefied wood) that can be transported as feedstock for bio-fuel facilities. All feedstock are suited for gasification, which produces syngas that can be used to synthesise petrol or diesel via Fischer-Tropsch reactions, or produce hydrogen via water gas shift reactions. Alternatively, the bio-oil product of fast pyrolysis may be upgraded to produce petrol and diesel, or can undergo steam reformation to produce hydrogen. Implementing a network of mobile facilities reduces the energy content of forest residues delivered to a bio-fuel facility as mobile facilities use a fraction of the biomass energy content to meet thermal or electrical demands. The total energy delivered by bio-oil, bio-slurry and torrefied wood is 45%, 65% and 87% of the initial forest residue energy content, respectively. However, implementing mobile facilities is economically feasible when large transport distances are required. For an annual harvest of 1.717 million m3 (equivalent to 2000 ODTPD), transport costs are reduced to less than 40% of the total levelised delivered feedstock cost when mobile facilities are implemented; transport costs account for up to 80% of feedstock costs for conventional woodchip delivery. Torrefaction provides the lowest cost pathway of delivering a forest residue resource when using mobile facilities. Cost savings occur against woodchip delivery for annual forest residue harvests above 2.25 million m3 or when transport distances greater than 250 km are required. Important parameters that influence levelised delivered costs of feedstock are transport distances (forest residue spatial density), haul cost factors, thermal and electrical demands of mobile facilities, and initial moisture content of forest residues. Relocating mobile facilities can be optimised for lowest cost delivery as transport distances of raw biomass are reduced. The overall cost of bio-fuel production is determined by the feedstock delivery pathway and also the bio-fuel production process employed. Results show that the minimum cost of petrol and diesel production is 0.86 litre -1 when a bio-oil feedstock is upgraded. This corresponds to a 2750 TPD upgrading facility requiring an annual harvest of 4.30 million m3. The miniμm cost of hydrogen production is 2.92 kg -1, via the gasification of a woodchip feedstock and subsequent water gas shift reactions. This corresponds to a 1100 ODTPD facility and requires an annual harvest of 947,000 m3. The levelised cost of bio-fuel strongly depends on the size of annual harvest required for bio-fuel facilities. There are optimal harvest volumes (bio-fuel facility sizes) for each bio-fuel production route, which yield minimum bio-fuel production costs. These occur as the benefits of economies of scale for larger bio-fuel facilities compete against increasing transport costs for larger harvests. Optimal harvest volumes are larger for bio-fuel production routes that use feedstock sourced from mobile facilities, as mobile facilities reduce total transport requirements.
NASA Astrophysics Data System (ADS)
Cifelli, R.; Chen, H.; Chandrasekar, V.
2017-12-01
A recent study by the State of California's Department of Water Resources has emphasized that the San Francisco Bay Area is at risk of catastrophic flooding. Therefore, accurate quantitative precipitation estimation (QPE) and forecast (QPF) are critical for protecting life and property in this region. Compared to rain gauge and meteorological satellite, ground based radar has shown great advantages for high-resolution precipitation observations in both space and time domain. In addition, the polarization diversity shows great potential to characterize precipitation microphysics through identification of different hydrometeor types and their size and shape information. Currently, all the radars comprising the U.S. National Weather Service (NWS) Weather Surveillance Radar-1988 Doppler (WSR-88D) network are operating in dual-polarization mode. Enhancement of QPE is one of the main considerations of the dual-polarization upgrade. The San Francisco Bay Area is covered by two S-band WSR-88D radars, namely, KMUX and KDAX. However, in complex terrain like the Bay Area, it is still challenging to obtain an optimal rainfall algorithm for a given set of dual-polarization measurements. In addition, the accuracy of rain rate estimates is contingent on additional factors such as bright band contamination, vertical profile of reflectivity (VPR) correction, and partial beam blockages. This presentation aims to improve radar QPE for the Bay area using advanced dual-polarization rainfall methodologies. The benefit brought by the dual-polarization upgrade of operational radar network is assessed. In addition, a pilot study of gap fill X-band radar performance is conducted in support of regional QPE system development. This paper also presents a detailed comparison between the dual-polarization radar-derived rainfall products with various operational products including the NSSL's Multi-Radar/Multi-Sensor (MRMS) system. Quantitative evaluation of various rainfall products is achieved using rainfall measurements from a validation gauge network, which shows that new dual-polarization methods can produce better QPE, and the X-band radar has excellent potential to augment WSR-88D for rainfall monitoring in this region.
Nova Upgrade: A proposed ICF facility to demonstrate ignition and gain, revision 1
NASA Astrophysics Data System (ADS)
1992-07-01
The present objective of the national Inertial Confinement Fusion (ICF) Program is to determine the scientific feasibility of compressing and heating a small mass of mixed deuterium and tritium (DT) to conditions at which fusion occurs and significant energy is released. The potential applications of ICF will be determined by the resulting fusion energy yield (amount of energy produced) and gain (ratio of energy released to energy required to heat and compress the DT fuel). Important defense and civilian applications, including weapons physics, weapons effects simulation, and ultimately the generation of electric power will become possible if yields of 100 to 1,000 MJ and gains exceeding approximately 50 can be achieved. Once ignition and propagating bum producing modest gain (2 to 10) at moderate drive energy (1 to 2 MJ) has been achieved, the extension to high gain (greater than 50) is straightforward. Therefore, the demonstration of ignition and modest gain is the final step in establishing the scientific feasibility of ICF. Lawrence Livermore National Laboratory (LLNL) proposes the Nova Upgrade Facility to achieve this demonstration by the end of the decade. This facility would be constructed within the existing Nova building at LLNL for a total cost of approximately $400 M over the proposed FY 1995-1999 construction period. This report discusses this facility.
Giovanella, Ligia; Mendonça, Maria Helena Magalhães de; Fausto, Marcia Cristina Rodrigues; Almeida, Patty Fidelis de; Bousquat, Aylene; Lima, Juliana Gagno; Seidl, Helena; Franco, Cassiano Mendes; Fusaro, Edgard Rodrigues; Almeida, Sueli Zeferino Ferreira
2016-09-01
The health policy context in Brazil has featured a series of measures to improve primary health care (PHC), including a national access and quality improvement program (Programa Nacional de Melhoria do Acesso e Qualidade, PMAQ-AB) and the Mais Médicos Program (More Doctors, PMM) and upgrading PHC centers ('Requalifica UBS'). The paper examines the PMM's placement of doctors, by quality of PHC structure, in an endeavor to identify synergies among the three programs. It reports on a transverse study based on secondary data from PMAQ-AB Cycles 1 and 2, the PMM and 'Requalifica UBS'. The PHC facilities inventoried during PMAQ-AB Cycle 1 were classified, on pre-established typology, into five groups ranked from A (best) to E (failed). They were then compared in terms of PMM personnel allocated and Requalifica UBS proposals. The results point to convergences in investments by the three programs. Incentives targeted predominantly PHC facilities of types B and C, indicating a concentration of efforts on PHC facilities with potential for structural quality improvements. In addition to expanding access, the provision of doctors by the PMM, added to infrastructure upgrades and work process improvements, contributes to addressing high turnover and guaranteeing retention of doctors in PHC.
NASA Astrophysics Data System (ADS)
Redshaw, M.; Barquest, B. R.; Bollen, G.; Bustabad, S. E.; Campbell, C. M.; Ferrer, R.; Gehring, A.; Kwiatkowski, A. A.; Lincoln, D. L.; Morrissey, D. J.; Pang, G. K.; Ringle, R.; Schwarz, S.
2011-07-01
The LEBIT (Low Energy Beam and Ion Trap) facility is the only Penning trap mass spectrometry (PTMS) facility to utilize rare isotopes produced via fast-beam fragmentation. This technique allows access to practically all elements lighter than uranium, and in particular enables the production of isotopes that are not available or that are difficult to obtain at isotope separation on-line facilities. The preparation of the high-energy rare-isotope beam produced by projectile fragmentation for low-energy PTMS experiments is achieved by gas stopping to slow down and thermalize the fast-beam ions, along with an rf quadrupole cooler and buncher and rf quadrupole ion guides to deliver the beam to the Penning trap. During its first phase of operation LEBIT has been very successful, and new developments are now underway to access rare isotopes even farther from stability, which requires dealing with extremely short lifetimes and low production rates. These developments aim at increasing delivery efficiency, minimizing delivery and measurement time, and maximizing use of available beam time. They include an upgrade to the gas-stopping station, active magnetic field monitoring and stabilization by employing a miniature Penning trap as a magnetometer, the use of stored waveform inverse Fourier transform (SWIFT) to most effectively remove unwanted ions, and charge breeding.
DIII-D Upgrade to Prepare the Basis for Steady-State Burning Plasmas
NASA Astrophysics Data System (ADS)
Buttery, R. J.; Guo, H. Y.; Taylor, T. S.; Wade, M. R.; Hill, D. N.
2014-10-01
Future steady-state burning plasma facilities will access new physics regimes and modes of plasma behavior. It is vital to prepare for this both experimentally using existing facilities, and theoretically in order to develop the tools to project to and optimize these devices. An upgrade to DIII-D is proposed to address the three critical aspects where research must go beyond what we can do now: (i) torque free electron heating to address the energy, particle and momentum transport mechanisms of burning plasmas using electron cyclotron (EC) heating and full power balanced neutral beams; (ii) off-axis heating and current drive to develop the path to true fusion steady state by reorienting neutral beams and deploying EC and helicon current drive; (iii) a new divertor with hot walls and reactor relevant materials to develop the basis for benign detached divertor operation compatible with wall materials and a high performance fusion core. These elements with modest incremental cost and enacted as a user facility for the whole US program will enable the US to lead on ITER and take a decision to proceed with a Fusion Nuclear Science Facility. Work supported by the US Department of Energy under DE-FC02-04ER54698 and DE-AC52-07NA27344.
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2014 CFR
2014-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2013 CFR
2013-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2012 CFR
2012-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
47 CFR 24.243 - The cost-sharing formula.
Code of Federal Regulations, 2011 CFR
2011-10-01
...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...
1998-09-28
The orbiter Atlantis is towed away from the Shuttle Landing Facility after returning home from California atop its Shuttle Carrier Aircraft. The orbiter spent 10 months in Palmdale undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
NASA Technical Reports Server (NTRS)
Marsh, Angela L.; Dudley, Stephanie R. B.
2014-01-01
With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.
Upgrade of MacCHESS facility for X-ray scattering of biological macromolecules in solution
Acerbo, Alvin Samuel; Cook, Michael J.; Gillilan, Richard Edward
2015-01-01
X-ray scattering of biological macromolecules in solution is an increasingly popular tool for structural biology and benefits greatly from modern high-brightness synchrotron sources. The upgraded MacCHESS BioSAXS station is now located at the 49-pole wiggler beamline G1. The 20-fold improved flux over the previous beamline F2 provides higher sample throughput and autonomous X-ray scattering data collection using a unique SAXS/WAXS dual detectors configuration. This setup achieves a combined q-range from 0.007 to 0.7 Å−1, enabling better characterization of smaller molecules, while opening opportunities for emerging wide-angle scattering methods. In addition, a facility upgrade of the positron storage ring to continuous top-up mode has improved beam stability and eliminated beam drift over the course of typical BioSAXS experiments. Single exposure times have been reduced to 2 s for 3.560 mg ml−1 lysozyme with an average quality factor I/σ of 20 in the Guinier region. A novel disposable plastic sample cell design that incorporates lower background X-ray window material provides users with a more pristine sample environment than previously available. Systematic comparisons of common X-ray window materials bonded to the cell have also been extended to the wide-angle regime, offering new insight into best choices for various q-space ranges. In addition, a quantitative assessment of signal-to-noise levels has been performed on the station to allow users to estimate necessary exposure times for obtaining usable signals in the Guinier regime. Users also have access to a new BioSAXS sample preparation laboratory which houses essential wet-chemistry equipment and biophysical instrumentation. User experiments at the upgraded BioSAXS station have been on-going since commissioning of the beamline in Summer 2013. A planned upgrade of the G1 insertion device to an undulator for the Winter 2014 cycle is expected to further improve flux by an order of magnitude. PMID:25537607
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... related to operations and maintenance of storage and distribution facilities for petroleum products within the Colton and Colton North Terminals, and with habitat restoration and management on a proposed on... maintenance of storage and distribution facilities for petroleum products on approximately 20 acres (ac) (8...
The Age of the Supercomputer Gives Way to the Age of the Super Infrastructure.
ERIC Educational Resources Information Center
Young, Jeffrey R.
1997-01-01
In October 1997, the National Science Foundation will discontinue financial support for two university-based supercomputer facilities to concentrate resources on partnerships led by facilities at the University of California, San Diego and the University of Illinois, Urbana-Champaign. The reconfigured program will develop more user-friendly and…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-23
... facilities and roads; construction of new public facilities (approximately 1,400 acres of the ground-disturbance total); and construction, operation, and maintenance of renewable energy projects, including solar... Supervisor, Ventura Fish and Wildlife Office, U.S. Fish and Wildlife Service, 2493 Portola Road, Suite B...
Design of an upgradeable 45-100 mA RFQ accelerator for FAIR
NASA Astrophysics Data System (ADS)
Zhang, Chuan; Schempp, Alwin
2009-10-01
A 325 MHz, 35 mA, 3 MeV Radio-Frequency Quadrupole (RFQ) accelerator will be operated as the first accelerating structure of the proton linac injector for the newly planned international science center Facility for Antiproton and Ion Research (FAIR) at GSI, Germany. In previous design studies, two high beam intensities, 70 and 100 mA, were used. Most recently, the design intensity has been changed to 45 mA, which is closer to the operational value. Taking advantage of the so-called New Four-Section Procedure, a new design, which is upgradable from 45 to 100 mA, has been developed for the FAIR proton RFQ. Besides the upgradability analyses, robustness studies of the new design to spatial displacements of the input beam and field errors are presented as well.
77 FR 51042 - Endangered Species Recovery Permit Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
..., weigh, mark, voucher, collect tissue, relocate, and release) the Shasta crayfish (Pacifastacus fortis.... TE-034101 Applicant: Naval Facilities Engineering Command Southwest, San Diego, California The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jing, Yichao; Fedurin, Mikhail; Stratakis, Diktys
2015-05-03
One of the operation modes for Accelerator Test Facility (ATF) upgrade is to provide high peak current, high quality electron beam for users. Such operation requires a bunch compressing system with a very large compression ratio. The CSR originating from the strong compressors generally could greatly degrade the quality of the electron beam. In this paper, we present our design for the entire bunch compressing system that will limit the effect of CSR on the e-beam’s quality. We discuss and detail the performance from the start to end simulation of such a compressor for ATF.
Perimeter security for Minnesota correctional facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crist, D.; Spencer, D.D.
1996-12-31
For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less
1998-09-28
The orbiter Atlantis, being towed from the Shuttle Landing Facility toward the Vehicle Assembly Building (VAB) , intersects the morning sun's rays. In the background, to the right of the VAB, are the Orbiter Processing Facility 1 and 2. Atlantis spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations at KSC in Orbiter Processing Facility 2 for its planned flight in June 1999
ERIC Educational Resources Information Center
SHORE, ROBERT E.
TO PROVIDE BETTER EDUCATIONAL OPPORTUNITIES FOR A SELECT GROUP OF STUDENTS, THE SAN RAFAEL PROGRAM FOR MORE ABLE LEARNERS WAS ESTABLISHED. AMONG ITS GOALS WERE PROBLEM-SOLVING FACILITY, CREATIVITY, RESPECT FOR LEARNING, AND SELF-UNDERSTANDING. THE GOALS ALSO INCLUDED KNOWLEDGE OF FACTS, IDEAS, CONCEPTS, SOCIAL SKILLS, SENSITIVITIES AND FEELING,…
2008-09-01
rich mix of medical services that range from simple ambulatory visits to plastic surgery , neuro- surgery , general surgery , bariatric , ophthalmology...CENTER SAN DIEGO NMCSD is a 266-bed tertiary care facility providing patient services ranging from same day surgery to brain surgery . The hospital...orthopedics, cardiology, thoracic surgery , vascular surgery , transient ischemic attack/cerebro vascular accident (TIA/CVA), OB/GYN, urology, non
Automated data collection based on RoboDiff at the ESRF beamline MASSIF-1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nurizzo, Didier, E-mail: Didier.nurizzo@esrf.fr; Guichard, Nicolas; McSweeney, Sean
2016-07-27
The European Synchrotron Radiation Facility has a long standing history in the automation of experiments in Macromolecular Crystallography. MASSIF-1 (Massively Automated Sample Screening and evaluation Integrated Facility), a beamline constructed as part of the ESRF Upgrade Phase I program, has been open to the external user community since July 2014 and offers a unique completely automated data collection service to both academic and industrial structural biologists.
2000-05-02
The preliminary design for the Space Experiment Research and Processing Laboratory (SERPL) at Kennedy Space Center is shown in this artist's rendition. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park
2014-09-01
to house the newly formed 498th Nuclear Systems Wing. This facility will be a two-story, steel-framed structure with reinforced concrete foundation ...occurs at depths of 200 to 400 feet below ground surface . The perched aquifer is a result of infiltration of water from both man-made and natural origins...as a Sensitive Compartmented Information Facility with reinforced concrete foundation , floors, and reinforced masonry walls. The construction
Analysis of Material Distribution from NSC San Diego to Local Customers.
1981-09-01
local customers, especially the Naval Air Rework Facility (NARY) at NASNI. This thesis offers a general discussion and documentation of the~- D 2...improved post-consolidation support to its local customers, especially the Naval Air Rework Facility (NARF) at NASNI. This thesis offers a general...Turned In To Store MTR Mandatory Turn-in Repairable NAB Naval Amphibious Base NC Not Carried NCA National City Annex NARF Naval Air Rework Facility
Upgrade of the BATMAN test facility for H- source development
NASA Astrophysics Data System (ADS)
Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.
2015-04-01
The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.
New developments in instrumentation at the W. M. Keck Observatory
NASA Astrophysics Data System (ADS)
Adkins, Sean M.; Armandroff, Taft E.; Fitzgerald, Michael P.; Johnson, James; Larkin, James E.; Lewis, Hilton A.; Martin, Christopher; Matthews, Keith Y.; Prochaska, J. X.; Wizinowich, Peter
2014-07-01
The W. M. Keck Observatory continues to develop new capabilities in support of our science driven strategic plan which emphasizes leadership in key areas of observational astronomy. This leadership is a key component of the scientific productivity of our observing community and depends on our ability to develop new instrumentation, upgrades to existing instrumentation, and upgrades to supporting infrastructure at the observatory. In this paper we describe the as measured performance of projects completed in 2014 and the expected performance of projects currently in the development or construction phases. Projects reaching completion in 2014 include a near-IR tip/tilt sensor for the Keck I adaptive optics system, a new center launch system for the Keck II laser guide star facility, and NIRES, a near-IR Echelle spectrograph for the Keck II telescope. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager, a deployable tertiary mirror for the Keck I telescope, upgrades to the spectrograph detector and the imager of the OSIRIS instrument, and an upgrade to the telescope control systems on both Keck telescopes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
G. L. Sharp; R. T. McCracken
The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR safety basis. The need for a design basis reconstitution program for the ATR has been identified along with the use of sound configuration management principles in order to support safe and efficient facility operation.« less
National synchrotron light source. Activity report, October 1, 1995--September 30, 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rothman, E.Z.; Hastings, J.B.
1997-05-01
The hard work done by the synchrotron radiation community, in collaboration with all those using large-scale central facilities during 1995, paid off in FY 1996 through the DOE`s Presidential Scientific Facilities Initiative. In comparison with the other DOE synchrotron radiation facilities, the National Synchrotron Light Source benefited least in operating budgets because it was unable to increase running time beyond 100%-nevertheless, the number of station hours was maintained. The major thrust at Brookhaven came from a 15% increase in budget which allowed the recruitment of seven staff in the beamlines support group and permitted a step increment in the fundingmore » of the extremely long list of upgrades; both to the sources and to the beamlines. During the December 1995 shutdown, the VUV Ring quadrant around U10-U12 was totally reconstructed. New front ends, enabling apertures up to 90 mrad on U10 and U12, were installed. During the year new PRTs were in formation for the infrared beamlines, encouraged by the investment the lab was able to commit from the initiative funds and by awards from the Scientific Facilities Initiative. A new PRT, specifically for small and wide angle x-ray scattering from polymers, will start work on X27C in FY 1997 and existing PRTs on X26C and X9B working on macromolecular crystallography will be joined by new members. Plans to replace aging radio frequency cavities by an improved design, originally a painfully slow six or eight year project, were brought forward so that the first pair of cavities (half of the project for the X-Ray Ring) will now be installed in FY 1997. Current upgrades to 350 mA initially and to 438 mA later in the X-Ray Ring were set aside due to lack of funds for the necessary thermally robust beryllium windows. The Scientific Facilities Initiative allowed purchase of all 34 windows in FY 1996 so that the power upgrade will be achieved in FY 1997.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, C.B.; Haglund, R.C.; Miller, M.E.
1996-12-31
The Vanadium/Lithium system has been the recent focus of ANL`s Blanket Technology Pro-ram, and for the last several years, ANL`s Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the Near the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magneto-hydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne`s Liquid Metal EXperiment (ALEX) frommore » a 200{degrees}C NaK facility to a 350{degrees}C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10{sup 3} to 10{sup 5} in lithium at 350{degrees}C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer multiple-hour, MHD tests, all at 230{degrees}C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, C.B.; Haglund, R.C.; Miller, M.E.
1996-12-31
The Vanadium/Lithium system has been the recent focus of ANL`s Blanket Technology Program, and for the last several years, ANL`s Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magnetohydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne`s Liquid Metal EXperiment (ALEX) from a 200{degree}Cmore » NaK facility to a 350{degree}C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10{sup 3} to 10{sup 5} in lithium at 350{degree}C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer, multiple-hour, MHD tests, all at 230{degree}C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000. 4 refs., 2 figs.« less
Control console replacement at the WPI Reactor. [Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less
Brookhaven National Laboratory's Accelerator Test Facility: research highlights and plans
NASA Astrophysics Data System (ADS)
Pogorelsky, I. V.; Ben-Zvi, I.
2014-08-01
The Accelerator Test Facility (ATF) at Brookhaven National Laboratory has served as a user facility for accelerator science for over a quarter of a century. In fulfilling this mission, the ATF offers the unique combination of a high-brightness 80 MeV electron beam that is synchronized to a 1 TW picosecond CO2 laser. We unveil herein our plan to considerably expand the ATF's floor space with an upgrade of the electron beam's energy to 300 MeV and the CO2 laser's peak power to 100 TW. This upgrade will propel the ATF even further to the forefront of research on advanced accelerators and radiation sources, supporting the most innovative ideas in this field. We discuss emerging opportunities for scientific breakthroughs, including the following: plasma wakefield acceleration studies in research directions already active at the ATF; laser wakefield acceleration (LWFA), where the longer laser wavelengths are expected to engender a proportional increase in the beam's charge while our linac will assure, for the first time, the opportunity to undertake detailed studies of seeding and staging of the LWFA; proton acceleration to the 100-200 MeV level, which is essential for medical applications; and others.
Operational Experience of the Upgraded Cryogenic Systems at the Nscl
NASA Astrophysics Data System (ADS)
McCartney, A. H.; Laumer, H. L.; Jones, S. A.
2010-04-01
The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sasser, K.
1994-06-01
In FY 1993, the Los Alamos National Laboratory Waste Management Group [CST-7 (formerly EM-7)] requested the Probabilistic Risk and Hazards Analysis Group [TSA-11 (formerly N-6)] to conduct a study of the hazards associated with several CST-7 facilities. Among these facilities are the Hazardous Waste Treatment Facility (HWTF), the HWTF Drum Storage Building (DSB), and the Mixed Waste Receiving and Storage Facility (MWRSF), which are proposed for construction beginning in 1996. These facilities are needed to upgrade the Laboratory`s storage capability for hazardous and mixed wastes and to provide treatment capabilities for wastes in cases where offsite treatment is not availablemore » or desirable. These facilities will assist Los Alamos in complying with federal and state requlations.« less
Flood Gives Birth to Dream School.
ERIC Educational Resources Information Center
Freeman, Laurie
1996-01-01
Forced by flooding of the Mississippi River to relocate their entire town, residents of tiny Valmeyer, Illinois, built an upgraded, improved school. The new facility serves elementary, middle, and high school students in three separate wings and is equipped to participate in distance learning. (MLF)
ERIC Educational Resources Information Center
Randall, Kathleen
1993-01-01
Describes how renovation can transform a school to a state-of-the-art facility without having to work from the ground up. Examined are the planning and design phases, the outer structure upgrading, the installation of more efficient heating, ventilation, and air conditioning systems, and renovation costs. (GR)
NASA Technical Reports Server (NTRS)
Schilizzi, R. T.
1980-01-01
The capabilities of the European very long baseline interferometry (VLBI) network are summarized. The range of baseline parameters, sensitivities, and recording and other equipment available are included. Plans for upgrading the recording facilities and the use of geostationary satellites for signal transfer and clock synchronization are discussed.
Test Capability Enhancements to the NASA Langley 8-Foot High Temperature Tunnel
NASA Technical Reports Server (NTRS)
Harvin, S. F.; Cabell, K. F.; Gallimore, S. D.; Mekkes, G. L.
2006-01-01
The NASA Langley 8-Foot High Temperature Tunnel produces true enthalpy environments simulating flight from Mach 4 to Mach 7, primarily for airbreathing propulsion and aerothermal/thermo-structural testing. Flow conditions are achieved through a methane-air heater and nozzles producing aerodynamic Mach numbers of 4, 5 or 7 and have exit diameters of 8 feet or 4.5 feet. The 12-ft long free-jet test section, housed inside a 26-ft vacuum sphere, accommodates large test articles. Recently, the facility underwent significant upgrades to support hydrocarbon fueled scramjet engine testing and to expand flight simulation capability. The upgrades were required to meet engine system development and flight clearance verification requirements originally defined by the joint NASA-Air Force X-43C Hypersonic Flight Demonstrator Project and now the Air Force X-51A Program. Enhancements to the 8-Ft. HTT were made in four areas: 1) hydrocarbon fuel delivery; 2) flight simulation capability; 3) controls and communication; and 4) data acquisition/processing. The upgrades include the addition of systems to supply ethylene and liquid JP-7 to test articles; a Mach 5 nozzle with dynamic pressure simulation capability up to 3200 psf, the addition of a real-time model angle-of-attack system; a new programmable logic controller sub-system to improve process controls and communication with model controls; the addition of MIL-STD-1553B and high speed data acquisition systems and a classified data processing environment. These additions represent a significant increase to the already unique test capability and flexibility of the facility, and complement the existing array of test support hardware such as a model injection system, radiant heaters, six-component force measurement system, and optical flow field visualization hardware. The new systems support complex test programs that require sophisticated test sequences and precise management of process fluids. Furthermore, the new systems, such as the real-time angle of attack system and the new programmable logic controller enhance the test efficiency of the facility. The motivation for the upgrades and the expanded capabilities is described here.
NASA Astrophysics Data System (ADS)
Loisel, G.; Lake, P.; Gard, P.; Dunham, G.; Nielsen-Weber, L.; Wu, M.; Norris, E.
2016-11-01
At Sandia National Laboratories, the x-ray generator Manson source model 5 was upgraded from 10 to 25 kV. The purpose of the upgrade is to drive higher characteristics photon energies with higher throughput. In this work we present characterization studies for the source size and the x-ray intensity when varying the source voltage for a series of K-, L-, and M-shell lines emitted from Al, Y, and Au elements composing the anode. We used a 2-pinhole camera to measure the source size and an energy dispersive detector to monitor the spectral content and intensity of the x-ray source. As the voltage increases, the source size is significantly reduced and line intensity is increased for the three materials. We can take advantage of the smaller source size and higher source throughput to effectively calibrate the suite of Z Pulsed Power Facility crystal spectrometers.
Electron Accelerators for Research at the Frontiers of Nuclear Physics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hartline, Beverly; Grunder, Hermann
1986-10-01
Electron accelerators for the frontiers of nuclear physics must provide high duty factor (gte 80) for coincidence measurements; few-hundred-MeV through few-GeV energy for work in the nucleonic, hadronic, and confinement regimes; energy resolution of ~ 10 -4; and high current (gte 100 zA). To fulfill these requirements new machines and upgrades of existing ones are being planned or constructed. Representative microtron-based facilities are the upgrade of MAMI at the University of Mainz (West Germany), the proposed two-stage cascade microtron at the University of Illinois (U.S.A.), and the three-stage Troitsk ``polytron'' (USSR). Representative projects to add pulse stretcher rings to existingmore » linacs are the upgrades at MIT-Bates (U.S.A.) and at NIKHEF-K (Netherlands). Recent advances in superconducting rf technology, especially in cavity design and fabrication, have made large superconducting cw linacs become feasible. Recirculating superconducting cw linacs are under construc« less
Navy Resale Services and Support Office Consolidation and Transportation Plan.
1983-06-01
ET AL JON 83 UNCLASSIFIED F/0 15/5 N EhhEEEmmImEEEEIIIIIE EEEE EIIIIEIIIIIIEE EEIIIIIEIIEIIE IIIIEEEIIIEEI I--EE- EIEI EIIIIIIIIIEllI -F I lmil 1.0...passes all such facilities in the Southern California area. Concentra- tions of customer populations center on San Diego and Long Beach with more remote...at Naval Station San Diego, Naval Air Station Miramar and Naval Station Long Beach in the current time frame and ultimately from the Central
The Shock and Vibration Bulletin. Part 2. Environmental Testing, Shock Testing, Shock Analysis
1981-05-01
held at the Holiday 17 Inn at the Embarcadero, San Diego, CA on October 21-23, 1980. The cop), Naval Ocean Systems Center, San Diego CA was the Host...Hellqvist, Kockuma AB, Malmo Sweden A 9OMPUTER-PONTROLLED MEASURING SYSTEM HAVING 128 ANALOG MEASURING CHANNELS *$1D FACILITIES 1POR NIGNALANALYSIS...SANDWICH STRUCTURES M. L Sonu, University of Daytom Research Institute, Dayton, OH PNEUMATIC VIBRATION CONTROL USING ACTIVE FORCE GENERATORS S. Banker and R
Building a secondary containment system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Broder, M.F.
1994-10-01
Retail fertilizer and pesticide dealers across the United States are installing secondary containment at their facilities or are seriously considering it. Much of this work is in response to new state regulations; however, many dealers not facing new regulations are upgrading their facilities to reduce their liability, lower their insurance costs, or comply with anticipated regulations. The Tennessee Valley Authority`s (TVA) National Fertilizer and Environmental Research Center (NFERC) has assisted dealers in 22 states in retrofitting containment to their facilities. Simultaneous improvements in the operational efficiency of the facilities have been achieved at many of the sites. This paper ismore » based on experience gained in that work and details the rationale used in planning secondary containment and facility modifications.« less
Status Report for the Hypervelocity Free-Flight Aerodynamic Facility
NASA Technical Reports Server (NTRS)
Cornelison, Charles J.; Arnold, James O. (Technical Monitor)
1997-01-01
The Hypervelocity Free-Flight Aerodynamic Facility, located at Ames Research Center, is NASA's only aeroballistic facility. During 1997, its model imaging and time history recording systems were the focus of a major refurbishment effort. Specifically the model detection, spark gap (light source); Kerr cell (high speed shuttering); and interval timer sub-systems were inspected, repaired, modified or replaced as required. These refurbishment efforts have fully restored the HFFAF's capabilities to a much better condition, comparable to what it was 15 years ago. Details of this refurbishment effort along with a brief discussion of future upgrade plans are presented.
1998-09-28
The orbiter Atlantis, being towed from the Shuttle Landing Facility, is reflected in waters from the Banana Creek next to the towway. The orbiter spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
Langley Aircraft Landing Dynamics Facility
NASA Technical Reports Server (NTRS)
Davis, Pamela A.; Stubbs, Sandy M.; Tanner, John A.
1987-01-01
The Langley Research Center has recently upgraded the Landing Loads Track (LLT) to improve the capability of low-cost testing of conventional and advanced landing gear systems. The unique feature of the Langley Aircraft Landing Dynamics Facility (ALDF) is the ability to test aircraft landing gear systems on actual runway surfaces at operational ground speeds and loading conditions. A historical overview of the original LLT is given, followed by a detailed description of the new ALDF systems and operational capabilities.
2009-07-08
meters; noisy urban daytime 70 – 80 Shouting at one meter; vacuum cleaner at three meters Gas lawnmower at 30 meters 60 – 70 Normal speech at one...military and political leaders during the Cold War. Since the National Aeronautics and Space Administration ( NASA ) was established in 1958, the...Preservation Needs with the Operation of Highly Technical or Scientific Facilities, specifically refers to the many active NASA and U.S. Air Force
2002-05-02
This diagram shows the planned locations of the Space Experiment Research and Processing Laboratory (SERPL) and the Space Station Commerce Park at Kennedy Space Center. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for the planned 400-acre Commerce Park.
Assessing Spectral Shortwave Cloud Observations at the Southern Great Plains Facility
NASA Technical Reports Server (NTRS)
McBride, P. J.; Marshak, A.; Wiscombe, W. J.; Flynn, C. J.; Vogelmann, A. M.
2012-01-01
The Atmospheric Radiation Measurement (ARM) program (now Atmospheric System Research) was established, in part, to improve radiation models so that they could be used reliably to compute radiation fluxes through the atmosphere, given knowledge of the surface albedo, atmospheric gases, and the aerosol and cloud properties. Despite years of observations, discrepancies still exist between radiative transfer models and observations, particularly in the presence of clouds. Progress has been made at closing discrepancies in the spectral region beyond 3 micron, but the progress lags at shorter wavelengths. Ratios of observed visible and near infrared cloud albedo from aircraft and satellite have shown both localized and global discrepancies between model and observations that are, thus far, unexplained. The capabilities of shortwave surface spectrometry have been improved in recent years at the Southern Great Plains facility (SGP) of the ARM Climate Research Facility through the addition of new instrumentation, the Shortwave Array Spectroradiometer, and upgrades to existing instrumentation, the Shortwave Spectroradiometer and the Rotating Shadowband Spectroradiometer. An airborne-based instrument, the HydroRad Spectroradiometer, was also deployed at the ARM site during the Routine ARM Aerial Facility Clouds with Low Optical Water Depths (CLOWD) Optical Radiative Observations (RACORO) field campaign. Using the new and upgraded spectral observations along with radiative transfer models, cloud scenes at the SGP are presented with the goal of characterizing the instrumentation and the cloud fields themselves.
Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected
76 FR 12405 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-07
.... Mandatory pavement markings. Airport signage. Runway guard lights. Wildlife study. PFC application.... Runway 18/36 pavement maintenance. Runway 13/31 pavement maintenance. PFC administration fees. Brief... Use: Tractor with snow blower and snow plow. Airport security and access control upgrades--design...
ERIC Educational Resources Information Center
Rowland, Dave
2001-01-01
Explores strategies for upgrading facility energy equipment that can cut energy costs and help substantially cover the costs of capital asset improvements. Discusses use of performance contracts to help schools leverage their operating budgets. Highlights how energy savings helped one school district finance $9.4 million in retrofits. (GR)
ERIC Educational Resources Information Center
Ullman, Ellen
2011-01-01
Construction on community college campuses is often paid for out of general capital or operations budgets or by way of taxpayer-approved bonds. But, as state and local money becomes increasingly scarce, many colleges, while still pursuing traditional funding sources, are also considering alternative strategies to support facilities upgrades on…
Considerations When Upgrading and Renovating Window Systems
ERIC Educational Resources Information Center
Gille, Steve
2010-01-01
Today's educational facilities managers face many challenges. As stewards of their campus' physical assets, these professionals are charged with improving students' learning environments, saving money, and maintaining the historical and aesthetic integrity of their buildings. For schools and universities that have not replaced their windows in…
Code of Federal Regulations, 2011 CFR
2011-10-01
... involving the security of overseas posts. The DOSESPP includes a wide range of elements of both physical and... security upgrade. This includes installation of forced entry/ballistic resistant (FE/BR) windows and doors...) Forced entry/ballistic resistant (FE/BR) components. This includes doors, windows, and related facilities...
Upgrade to the Birmingham Irradiation Facility
NASA Astrophysics Data System (ADS)
Dervan, P.; French, R.; Hodgson, P.; Marin-Reyes, H.; Parker, K.; Wilson, J.; Baca, M.
2015-10-01
The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 1015 (1 MeV neutron equivalent (neq)) cm-2 in 80 s with proton beam currents of 1 μA and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of -50 °C in 30 min and aims to maintain sub-0 °C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and performance of the new cooling system.
NASA Astrophysics Data System (ADS)
Borg, M.; Bertarelli, A.; Carra, F.; Gradassi, P.; Guardia-Valenzuela, J.; Guinchard, M.; Izquierdo, G. Arnau; Mollicone, P.; Sacristan-de-Frutos, O.; Sammut, N.
2018-03-01
The CERN Large Hadron Collider is currently being upgraded to operate at a stored beam energy of 680 MJ through the High Luminosity upgrade. The LHC performance is dependent on the functionality of beam collimation systems, essential for safe beam cleaning and machine protection. A dedicated beam experiment at the CERN High Radiation to Materials facility is created under the HRMT-23 experimental campaign. This experiment investigates the behavior of three collimation jaws having novel composite absorbers made of copper diamond, molybdenum carbide graphite, and carbon fiber carbon, experiencing accidental scenarios involving the direct beam impact on the material. Material characterization is imperative for the design, execution, and analysis of such experiments. This paper presents new data and analysis of the thermostructural characteristics of some of the absorber materials commissioned within CERN facilities. In turn, characterized elastic properties are optimized through the development and implementation of a mixed numerical-experimental optimization technique.
A microprocessor tester for the treat upgrade reactor trip system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenkszus, F.R.; Bucher, R.G.
1985-02-01
The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. To improve the analytical extrapolation of test results to full-size assembly bundles, the facility upgrade will increase the maximum size of the test bundle from 7 to 37 fuel pins. By creating a core convertor zone around the test location, the neutron spectrum incident on the test assembly will be hardened and the maximum energy deposited in the sample will be increased. In addition, a programmable Automated Reactor Control System (ARCS) willmore » permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety system is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations. A quantitative reliability analysis of the RTS shows that the unreliability, that is, the probability of failure, is acceptable for a 10 hour mission time or risk interval.« less
Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)
NASA Technical Reports Server (NTRS)
Stengle, Thomas; Hoge, Susan
2008-01-01
The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... previously approved in 40 CFR 52.223 is retained. (iii) The addition of Rule 209, Fossil Fuel-Steam Generator... CFR 52.223 are retained. (ii) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on July 22...) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on February 10, 1977, is disapproved and the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... previously approved in 40 CFR 52.223 is retained. (iii) The addition of Rule 209, Fossil Fuel-Steam Generator... CFR 52.223 are retained. (ii) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on July 22...) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on February 10, 1977, is disapproved and the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... previously approved in 40 CFR 52.223 is retained. (iii) The addition of Rule 209, Fossil Fuel-Steam Generator... CFR 52.223 are retained. (ii) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on July 22...) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on February 10, 1977, is disapproved and the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... previously approved in 40 CFR 52.223 is retained. (iii) The addition of Rule 209, Fossil Fuel-Steam Generator... CFR 52.223 are retained. (ii) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on July 22...) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on February 10, 1977, is disapproved and the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... previously approved in 40 CFR 52.223 is retained. (iii) The addition of Rule 209, Fossil Fuel-Steam Generator... CFR 52.223 are retained. (ii) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on July 22...) Rule 209, Fossil Fuel-Steam Generator Facility, submitted on February 10, 1977, is disapproved and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
... reflect the needs and operational use of the United States Navy. DATES: This rule is effective February 10... Docket Management Facility by that date. If an adverse comment, or notice of intent to submit an adverse... . (2) Fax: (202) 493-2251. (3) Mail or Delivery: Docket Management Facility (M-30), U.S. Department of...
HIPAA security standards: is your facility ready?
2000-05-01
Now that final rules are emerging related to the Health Insurance Portability and Accountability Act of 1996, it's more important than ever to make sure your facility's data security standards measure up. The best advice? 'Forget HIPAA for the moment and look at what you have in place,' says William Spooner, senior vice president and chief information officer for Sharp Healthcare in San Diego.
1973-06-01
SL2-06-102 (June 1973) --- A black and white photograph of the San Francisco Bay California area, taken from the Skylab 1-2 space station cluster in Earth orbit. THE PICTURE SHOULD BE HELD WITH THE CLOUDS AND PACIFIC OCEAN ON THE LEFT. This photograph was taken by one of six lenses of the Itek-furnished S190-A Multispectral Photographic Facility Experiment in the Multiple Docking Adapter of the space station. Note the thickly populated and highly developed area around the Bay. Among the cities visible in this photograph are San Francisco, Oakland, Berkeley and San Jose. This view extends eastward to show a portion of the San Joaquin Valley. The S190-A experiment is part of the Skylab Earth Resources Experiments Package (EREP). Type SO-022 film was used. This station covered the spectral region from 0.5 to 0.6 micrometers. Photo credit: NASA
1973-06-01
SL2-05-102 (June 1973) --- A black and white photograph of the San Francisco Bay California area, taken from the Skylab 1-2 space station cluster in Earth orbit. THE PICTURE SHOULD BE HELD WITH THE CLOUDS AND PACIFIC OCEAN ON THE LEFT. This photograph was taken by one of six lenses of the Itek-furnished S190-A Multispectral Photographic Facility Experiment in the Multiple Docking Adapter of the space station. Note the thickly populated and highly developed area around the Bay. Among the cities visible in this photograph are San Francisco, Oakland, Berkeley and San Jose. This view extends eastward to show a portion of the San Joaquin Valley. The S190-A experiment is part of the Skylab Earth Resources Experiments Package (EREP). Type SO-022 film was used. This station covered the spectral region from 0.6 to .07 micrometers. Photo credit: NASA
Tidal and Lunar Data for Point Mugu, San Nicholas Island, and the Barking Sands Area During 1991
1990-12-31
12 13 M 1111 ft" trn able ISI 011 1113 em toao mu" MOO 13 14 am tm Sea 173 am tSOM any 11V am Sell mufi 410 1 Is m 171e Oka 1t0 SNY tell E1 IInS am tat...CA 93106-0260 Naval Oceanography Command Facility Naval Air Station, North Island Ventura College San Diego, CA 92135-5130 Biology Department 4667
Acquisition of a SAXS Facility for the Study of Novel Polymer Nanocomposite Membranes
2015-02-19
at the 2015 MRS Spring National Meeting, San Francisco , CA, April, 2015. 2. A. Millet and D. Suleiman “Sulfonation and Characterization of Poly...the 2015 ACS PRISM Meeting San Juan , PR March, 2015. 3. D. Suleiman “Polymer Nanocomposites: Technology for the XXI Century.” Oral Key Note...have been using the equipment: 1. Rinaldo Díaz 2. Arnaldo López 3. Alexander Millet 4. Nataira Pagán 5. Luis Sotomayor 6. Vanessa Torres 7
A week of SRI 2003 in San Francisco
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, Art
The Eighth International Conference on Synchrotron Radiation (SRI 2003) ended its August 25-28 run at the Yerba Buena Center for the Arts in San Francisco with almost as many in attendance as at the beginning. The steady attendance was surely a tribute to the quality of the program and the excitement it generated among the more than 700 registrants who gathered for four days of plenary talks, parallel sessions, and posters, as well as facility tours of the ALS and SSRL on August 29.
2006-10-12
Ames holds a Media Day at the Hypervelocity Free Flight facility where Ames is conducting high-speed tests of small models of the agency's new Orion CEV to learn about stability during flight. The hypervelocity test facility uses a gun to shoot Orion models between 0.5 and l.5 inches (1.25 - 3.75 centimeters in diameter. The facility can conduct experiments with speeds up to 19,000 miles per hour (30,400 kilometers per hour) - Gary Reyes, San Jose mercury New interviews Chuck Cornelison
ERIC Educational Resources Information Center
Bennett, Bob
2009-01-01
Soaring energy prices and tightening school budgets don't mix well. In fact, millions of children across the United States are being educated in energy-leaking, unhealthful facilities in dire need of physical upgrade and systems modernization. Increasing numbers of K-12 districts and institutions of higher learning are turning to performance-based…
Changes in growth rates in Mercenaria mercenaria in Narragansett Bay
The state of Rhode Island has taken several measures to reduce nitrogen (N) added to Narragansett Bay and waters leading to the Bay. These include upgrading wastewater treatment facilities to tertiary treatment and increasing the holding capacity of storm water to prevent storm r...
ERIC Educational Resources Information Center
Koger, Dale
2001-01-01
Explains how colleges and universities can increase revenue and enhance status by upgrading their stadiums and arenas. Related issues considered are: determining how much a school should add to its existing stadium and arena, selecting the design and management team, and raising capital. Outlines key areas that design and construction teams should…
40 CFR 256.22 - Recommendations for State regulatory powers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste... prohibit new open dumps and close or upgrade all existing open dumps. (a) Solid waste disposal standards... solid waste disposal facility. These procedures should include identification of future land use or the...
40 CFR 256.22 - Recommendations for State regulatory powers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste... prohibit new open dumps and close or upgrade all existing open dumps. (a) Solid waste disposal standards... solid waste disposal facility. These procedures should include identification of future land use or the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barariu, G.; Giumanca, R.
2006-07-01
Pre-feasibility and feasibility studies were performed for decommissioning of the water-cooled water-moderated research reactor (WWER) located in Bucharest - Magurele, Romania. Using these studies as a starting point, the preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as for the rehabilitation of the existing Radioactive Waste Treatment Plant and for the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and ecological reconstruction of the grounds need to be provided for, in accordance with national and international regulations. Inmore » accordance with IAEA recommendations at the time, the pre-feasibility study proposed three stages of decommissioning. However, since then new ideas have surfaced with regard to decommissioning. Thus, taking into account the current IAEA ideology, the feasibility study proposes that decommissioning of the WWER be done in one stage to an unrestricted clearance level of the reactor building in an Immediate Dismantling option. Different options and the corresponding derived preferred option for waste management are discussed taking into account safety measures, but also considering technical, logistical and economic factors. For this purpose, possible types of waste created during each decommissioning stage are reviewed. An approximate inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the recommended international basic safety standards identified in the previous phase of the project. The existing Radioactive Waste Treatment Plant (RWTP) from the Horia Hulubei Institute for Nuclear Physics and Engineering (IFIN-HH), which has been in service with no significant upgrade since 1974, will need refurbishing due to deterioration, as well as upgrading in order to ensure the plant complies with current safety standards. This plant will also need to be adapted to treat wastes generated by WWER dismantling. The Baita-Bihor National Radioactive Waste Disposal Facility consists of two galleries in an abandoned uranium mine located in the central-western part of the Bihor Mountains in Transylvania. The galleries lie at a depth of 840 m. The facility requires a considerable overhaul. Several steps recommended for the upgrade of the facility are explored. Environmental concerns have lately become a crucial part of the radioactive waste management strategy. As such, all decisions must be made with great regard for land utilization around nuclear objectives. (authors)« less
Artist rendition of the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
The preliminary design for the Space Experiment Research and Processing Laboratory (SERPL) at Kennedy Space Center is shown in this artist's rendition. The SERPL is a planned 100,000-square- foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.
Location for the planned Space Experiment Research and Processing Laboratory
NASA Technical Reports Server (NTRS)
2000-01-01
This diagram shows the planned locations of the Space Experiment Research and Processing Laboratory (SERPL) and the Space Station Commerce Park at Kennedy Space Center. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for the planned 400- acre commerce park.
New Phone System Coming to NCI Campus at Frederick | Poster
By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current Avaya phone system with a Cisco Unified Communications phone system. The Cisco system is already in use at the Advanced Technology Research Facility (ATRF).
NASA Technical Reports Server (NTRS)
Paryz, Roman W.
2014-01-01
Several upgrade projects have been completed at the NASA Langley Research Center National Transonic Facility over the last 1.5 years in an effort defined as STARBUKS - Subsonic Transonic Applied Refinements By Using Key Strategies. This multi-year effort was undertaken to improve NTF's overall capabilities by addressing Accuracy and Validation, Productivity, and Reliability areas at the NTF. This presentation will give a brief synopsis of each of these efforts.
NASA Astrophysics Data System (ADS)
Dell'Agnello, S.; Boni, A.; Cantone, C.; Ciocci, E.; Martini, M.; Patrizi, G.; Tibuzzi, M.; Delle Monache, G.; Vittori, R.; Bianco, G.; Currie, D.; Intaglietta, N.; Salvatori, L.; Lops, C.; Contessa, S.; Porcelli, L.; Mondaini, C.; Tuscano, P.; Maiello, M.
2017-11-01
The SCF_Lab (Satellite/lunar/gnss laser ranging and altimetry Characterization Facility Laboratory) of INFNLNF is designed to cover virtually LRAs (Laser Retroreflector Arrays) of CCRs (Cube Corner Retroreflectors) for missions in the whole solar system, with a modular organization of its instrumentation, two redundant SCF (SCF_Lab Characterization Facilities), and an evolutionary measurement approach, including customization and potentially upgrade on-demand. See http://www.lnf.infn.it/esperimenti/etrusco/ for a general description.
Proceedings of the nineteenth LAMPF Users Group meeting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradbury, J.N.
1986-02-01
Separate abstracts were prepared for eight invited talks on various aspects of nuclear and particle physics as well as status reports on LAMPF and discussions of upgrade options. Also included in these proceedings are the minutes of the working groups for: energetic pion channel and spectrometer; high resolution spectrometer; high energy pion channel; neutron facilities; low-energy pion work; nucleon physics laboratory; stopped muon physics; solid state physics and material science; nuclear chemistry; and computing facilities. Recent LAMPF proposals are also briefly summarized. (LEW)
NEP technology: FY 1992 milestones (NASA LeRC)
NASA Technical Reports Server (NTRS)
Sovey, Jim
1993-01-01
A discussion of Nuclear Electric Propulsion (NEP) thrusters and facilities is presented in vugraph form. The NEP thrusters are discussed in the context of the following three items: (1) establishing a 100 H test capability for 100-kW magnetoplasmadynamic (MPD) thrusters; (2) demonstrating a lightweight 20-kW krypton ion thruster; and (3) the optimization of the design of low-mass power processor transformers. The primary accomplishment at NEP facilities was the completion of the Electric Propulsion Laboratory's (EPL's) tank 5 cryopump upgrade.
The aerospace energy systems laboratory: Hardware and software implementation
NASA Technical Reports Server (NTRS)
Glover, Richard D.; Oneil-Rood, Nora
1989-01-01
For many years NASA Ames Research Center, Dryden Flight Research Facility has employed automation in the servicing of flight critical aircraft batteries. Recently a major upgrade to Dryden's computerized Battery Systems Laboratory was initiated to incorporate distributed processing and a centralized database. The new facility, called the Aerospace Energy Systems Laboratory (AESL), is being mechanized with iAPX86 and iAPX286 hardware running iRMX86. The hardware configuration and software structure for the AESL are described.
EPA Activities for Cleaner Air
Activities in San Joaquin Valley to reduce air pollution, meet federal health standards for ozone and particulates, fund clean tech and health research, and enforce compliance with facility-specific operating permits for industrial air pollution sources.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
..., Murrieta. The facilities are used for the production of cardiovascular devices including stents, catheters... finished product) include: resins, plastic tubing, stent components, plastic packaging, plastic clips...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kleissl, J.; Urquhart, B.; Ghonima, M.
During the University of California, San Diego (UCSD) Sky Imager Cloud Position Study, two University of California, San Diego Sky Imagers (USI) (Figure 1) were deployed the U.S. Department of Energy(DOE)’s Atmospheric Radiation Measurement (ARM) Climate Research Facility Southern Great Plains SGP) research facility. The UCSD Sky Imagers were placed 1.7 km apart to allow for stereographic determination of the cloud height for clouds over approximately 1.5 km. Images with a 180-degree field of view were captured from both systems during daylight hours every 30 seconds beginning on March 11, 2013 and ending on November 4, 2013. The spatial resolutionmore » of the images was 1,748 × 1,748, and the intensity resolution was 16 bits using a high-dynamic-range capture process. The cameras use a fisheye lens, so the images are distorted following an equisolid angle projection.« less
Aerospace medicine at Brooks AFB, TX: hail and farewell.
Nunneley, Sarah A; Webb, James T
2011-05-01
With the impending termination of USAF operations at Brooks Air Force Base (AFB) in San Antonio, TX, it is time to consider its historic role in Aerospace Medicine. The base was established in 1917 as a flight training center for the U.S. Army Air Service and in 1926 became home to its School of Aviation Medicine. The school moved to San Antonio's Randolph Field in 1931, but in 1959 it returned to Brooks where it occupied new facilities to support its role as a national center for U.S. Air Force aerospace medicine, including teaching, clinical medicine, and research. The mission was then expanded to encompass support of U.S. military and civilian space programs. With the abrupt termination of the military space program in 1969, research at Brooks focused on clinical aviation medicine and support of advanced military aircraft while continuing close cooperation with NASA in support of orbital spaceflight and the journey to the Moon. Reorganization in the 1990s assigned all research functions at Brooks to the Human Systems Division and its successors, leaving to USAFSAM the missions related to clinical work and teaching. In 2002 the USAF and the city of San Antonio implemented shared operation of Brooks as a "City-Base" in the hope of deflecting threatened closure. Nevertheless, under continuing pressure to consolidate military facilities in the United States, the 2005 Base Closure and Realignment Commission ordered Brooks closed by 2011, with its aerospace medicine functions relocated to new facilities at Wright-Patterson AFB in Dayton, OH.
Elliptical superconducting RF cavities for FRIB energy upgrade
NASA Astrophysics Data System (ADS)
Ostroumov, P. N.; Contreras, C.; Plastun, A. S.; Rathke, J.; Schultheiss, T.; Taylor, A.; Wei, J.; Xu, M.; Xu, T.; Zhao, Q.; Gonin, I. V.; Khabiboulline, T.; Pischalnikov, Y.; Yakovlev, V. P.
2018-04-01
The multi-physics design of a five cell, βG = 0 . 61, 644 MHz superconducting elliptical cavity being developed for an energy upgrade in the Facility for Rare Isotope Beams (FRIB) is presented. The FRIB energy upgrade from 200 MeV/u to 400 MeV/u for heaviest uranium ions will increase the intensities of rare isotope beams by nearly an order of magnitude. After studying three different frequencies, 1288 MHz, 805 MHz, and 644 MHz, the 644 MHz cavity was shown to provide the highest energy gain per cavity for both uranium and protons. The FRIB upgrade will include 11 cryomodules containing 5 cavities each and installed in 80-meter available space in the tunnel. The cavity development included extensive multi-physics optimization, mechanical and engineering analysis. The development of a niobium cavity is complete and two cavities are being fabricated in industry. The detailed design of the cavity sub-systems such as fundamental power coupler and dynamic tuner are currently being pursued. In the overall design of the cavity and its sub-systems we extensively applied experience gained during the development of 650 MHz low-beta cavities at Fermi National Accelerator Laboratory (FNAL) for the Proton Improvement Plan (PIP) II.
The Network Operations Control Center upgrade task: Lessons learned
NASA Technical Reports Server (NTRS)
Sherif, J. S.; Tran, T.-L.; Lee, S.
1994-01-01
This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.
Upgrades to the LLNL flash x-ray induction linear accelerator (FXR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scarpetti, R. D., LLNL
1997-06-30
The FXR is an induction linear accelerator used for flash radiography at the Lawrence Livermore National Laboratory's Site 300 Test Facility. The FXR was originally completed in 1982 and has been in continuous use as a radiographic tool. At that time the FXR produced a 17MeV, 2.2 kA burst of electrons for a duration of 65 ns. An upgrade of the FXR was recently completed. The purpose of this upgrade was to improve the performance of the FXR by increasing the energy of the electron injector from 1.2 MeV to 2.5 MeV and the beam current from 2.2 kA tomore » 3 kA, improving the magnetic transport system by redesigning the solenoidal transport focus coils, reducing the rf coupling of the electron beam to the accelerator cells, and by adding additional beam diagnostics. We will describe the injector upgrades and performance as well as our efforts to tune the accelerator by minimizing beam corkscrew motion and the impact of Beam Breakup Instability on beam centroid motion throughout the beam line as the current is increased to 3 kA.« less
Powell, Charles L.; Fisk, Lanny H.; Maloney, David F.; Haasl, David M.
2010-01-01
The stratigraphic occurrences and interpreted biostratigraphy of invertebrate fossil taxa in the upper San Joaquin Formation and lower-most Tulare Formation encountered at the Chemical Waste Management Kettleman Hills waste disposal facility on the North Dome of the Kettleman Hills, Kings County, California are documented. Significant new findings include (1) a detailed biostratigraphy of the upper San Joaquin Formation; (2) the first fossil occurrence of Modiolus neglectus; (3) distinguishing Ostrea sequens from Myrakeena veatchii (Ostrea vespertina of authors) in the Central Valley of California; (4) differentiating two taxa previously attributed to Pteropurpura festivus; (5) finding a stratigraphic succession between Caesia coalingensis (lower in the section) and Catilon iniquus (higher in the section); and (6) recognizing Pliocene-age fossils from around Santa Barbara. In addition, the presence of the bivalves Anodonta and Gonidea in the San Joaquin Formation, both restricted to fresh water and common in the Tulare Formation, confirm periods of fresh water or very close fresh-water environments during deposition of the San Joaquin Formation.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-15
... facilities: New compressor station (Redd Farm Compressor Station) on Columbia's existing Line 1570 in... setting; Modifications to the Smithfield Compressor Station consisting of upgrades to the existing... coolers; Modifications to the Glenville Compressor Station by installing two gas-fired turbines, each...
Developing a Comprehensive Housing Strategy: A Case Study
ERIC Educational Resources Information Center
Marsters, Tim; Bliss, Kelly
2007-01-01
In the current highly competitive higher education market in North America, many colleges have identified the importance of upgrading their existing residential housing facilities as part of their strategy to attract and retain students. The case study discussed in this article describes the successful planning process used by Perkins+Will and…
TECHNOLOGIES FOR UPGRADING EXISTING OR DESIGNING NEW DRINKING WATER TREATMENT FACILITIES
The publication compiles material presented at a series of workshops and helps to focus attention on the many treatment and disinfection decisions that will be facing both ground water and surface source systems over the next several years, as implementation of the 1986 Safe Drin...
Automate Your Physical Plant Using the Building Block Approach.
ERIC Educational Resources Information Center
Michaelson, Matt
1998-01-01
Illustrates how Mount Saint Vincent University (Halifax), by upgrading the control and monitoring of one building or section of the school at a time, could produce savings in energy and operating costs and improve the environment. Explains a gradual, "building block" approach to facility automation that provides flexibility without a…
2018-03-30
Modifications and upgrades are underway inside the Astronaut Crew Quarters in the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The crew quarters are being prepared for the next generation of space explorers. The historic facility housed Apollo and space shuttle astronauts before and after their missions into space.
Energy dissipation for flat-sloped stepped spillways using new inception point relationship
USDA-ARS?s Scientific Manuscript database
Transforming from a rural to an urban landscape has created a change in hazard classification for many earthen embankments. As a result, these facilities provide inadequate spillway capacity for the upgraded hazard rating. To bring these dams into compliance with state and federal dam safety regul...
ERIC Educational Resources Information Center
DiConsiglio, John
2010-01-01
Since the recession struck in late 2008, fundraising has become a minefield, and even the steadiest advancement officers are unsure of their steps. For years, education fundraisers heard yes from donor after donor. Yes to large gifts. Yes to endowment boosts. Yes to scholarships and athletic facility upgrades. In the 2008 fiscal year, educational…
ERIC Educational Resources Information Center
Rice, Mike
2006-01-01
Circuit breakers are the linchpin of an institution's power-distribution system, so it's not surprising that several warning signs of an aging system relate to these devices. When warning signs occur, it's a message to facilities managers and administrators that breakers may need to be upgraded to help the power distribution system meet existing…
Enough to Go 'Round? Thinking Smart about Total Cost of Ownership
ERIC Educational Resources Information Center
McIntire, Todd
2006-01-01
Total cost of ownership or TCO refers to the life cycle of costs for technology, including both direct and indirect expenses. TCO includes costs incurred by capital (hardware, software, and facilities); administration and operation (planning, upgrade, replacement, and technical support); and end-user operation (staff development and user…
The Contemporary Student Center: Challenges at Metropolitan Universities
ERIC Educational Resources Information Center
Henry, Wilma J.
2004-01-01
As the student center movement--to upgrade, expand, or acquire a new facility--continues in the new millennium, metropolitan institutions, in particular, are finding that their unique circumstances often challenge their ability to keep pace with their nonmetropolitan counterparts. This research presents the results of a study of the role of…
40 CFR 35.3520 - Systems, projects, and project-related costs eligible for assistance from the Fund.
Code of Federal Regulations, 2010 CFR
2010-07-01
... or upgrade of eligible storage facilities, including finished water reservoirs, to prevent... undertake feasible and appropriate changes in operations to ensure compliance over the long-term. (3... development strategy. (3) Reservoirs or rehabilitation of reservoirs, except for finished water reservoirs and...
USDA and Florida Power & Light Company Successfully Save $85K/year with UESC Collaboration
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Case study features the U.S. Department of Agriculture's (USDA) Miami Subtropical Horticulture Research Station, which was in need of several energy upgrades. USDA teamed up with Florida Light & Power to install much needed facility improvements are creating a savings of $85,000 per year.
CSO DISINFECTION PILOT STUDY: SPRING CREEK CSO STORAGE FACILITY UPGRADE
This research summary presents the results of a pilot-scale disinfection study performed for the New York City Department of Environmental Protection and the U.S. Environmental Protection Agency (US EPA) under a contract to Camp Dresser & McKee of Woodbury, New York. The main ob...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-29
... encompass organization-wide energy performance improvement, such as building technology upgrades, product... help EPA promote energy-efficient technologies by evaluating the efficiency of their buildings using... Leaders--Ineligible Facilities List (5900-20) ENERGY STAR Leaders--Leaders Story (5900-20) Service and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-20
... upgraded licenses or license renewals to operate the controls at a nuclear reactor facility. This... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2012-0184] Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request AGENCY: Nuclear Regulatory...
Environmental Control Systems for Exploration Missions One and Two
NASA Technical Reports Server (NTRS)
Falcone, Mark A.
2017-01-01
In preparing for Exploration Missions One and Two (EM-1 & EM-2), the Ground Systems Development and Operations Program has significant updates to be made to nearly all facilities. This is all being done to accommodate the Space Launch System, which will be the world’s largest rocket in history upon fruition. Facilitating the launch of such a rocket requires an updated Vehicle Assembly Building, an upgraded Launchpad, Payload Processing Facility, and more. In this project, Environmental Control Systems across several facilities were involved, though there is a focus around the Mobile Launcher and Launchpad. Parts were ordered, analysis models were updated, design drawings were updated, and more.
Review of Aeronautical Wind Tunnel Facilities
NASA Technical Reports Server (NTRS)
1988-01-01
The nation's aeronautical wind tunnel facilities constitute a valuable technological resource and make a significant contribution to the global supremacy of U.S. aircraft, both civil and military. At the request of NASA, the National Research Council's Aeronautics and Space Engineering Board organized a commitee to review the state of repair, adequacy, and future needs of major aeronautical wind tunnel facilities in meeting national goals. The comittee identified three main areas where actions are needed to sustain the capability of NASA's aeronautical wind tunnel facilities to support the national aeronautical research and development activities: tunnel maintenance and upgrading, productivity enhancement, and accommodation of new requirements (particularly in hypersonics). Each of these areas are addressed and the committee recommendations for appropriate actions presented.
NASA Astrophysics Data System (ADS)
Barber, Corinne; DIRC at EIC Collaboration
2015-10-01
The High-B test facility at Thomas Jefferson National Accelerator Facility allows researchers to evaluate the gain of compact photon sensors, such as Micro-Channel-Plate Photomultipliers (MCP-PMTs), in magnetic fields up to 5 T. These ongoing studies support the development of a Detector of Internally Reflected Cherenkov light (DIRC) to be used in an Electron Ion Collider (EIC). Here, we present our summer 2015 activities to upgrade and improve the facility, and we show results for MCP-PMT gain changes in high B-fields. To monitor the light stability delivered to the MCP-PMTs being tested, we implemented a Silicon Photomultiplier (SiPM) in the setup and calibrated the ADC reading this sensor. A 405-nm Light-Emitting Diode (LED) housed in an optical tube compatible with neutral density filters was also installed. The filters provide an alternative way of reducing the light output of the LED to operate the MCP-PMTs in a single-photon mode. We calibrated a set of filters by means of a photodiode and measured the photon flux at multiple positions relative to the LED. This information helped us to design 3D-printed holders unique to each MCP-PMT so that the photocathode receives the greatest amount of light. The improvements to the setup allow for more precise PMT gain evaluation. This team includes 7 collaborators/co-authors besides myself: Yordanka Ilieva, Kijun Park, Greg Kalicy, Carl Zorn, Pawel Nadel-Turonski, Tongtong Cao, and Lee.
NASA Technical Reports Server (NTRS)
Connelly, Joseph; Blake, Peter; Jones, Joycelyn
2008-01-01
The authors report operational upgrades and streamlined data analysis of a commissioned electronic speckle interferometer (ESPI) in a permanent in-house facility at NASA's Goddard Space Flight Center. Our ESPI was commercially purchased for use by the James Webb Space Telescope (JWST) development team. We have quantified and reduced systematic error sources, improved the software operability with a user-friendly graphic interface, developed an instrument simulator, streamlined data analysis for long-duration testing, and implemented a turn-key approach to speckle interferometry. We also summarize results from a test of the JWST support structure (previously published), and present new results from several pieces of test hardware at various environmental conditions.
A Roadmap for HEP Software and Computing R&D for the 2020s
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alves, Antonio Augusto, Jr; et al.
Particle physics has an ambitious and broad experimental programme for the coming decades. This programme requires large investments in detector hardware, either to build new facilities and experiments, or to upgrade existing ones. Similarly, it requires commensurate investment in the R&D of software to acquire, manage, process, and analyse the shear amounts of data to be recorded. In planning for the HL-LHC in particular, it is critical that all of the collaborating stakeholders agree on the software goals and priorities, and that the efforts complement each other. In this spirit, this white paper describes the R&D activities required to preparemore » for this software upgrade.« less
The extraction of bitumen from western oil sands: Volume 2. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oblad, A.G.; Dahlstrom, D.A.; Deo, M.D.
1997-11-26
The program is composed of 20 projects, of which 17 are laboratory bench or laboratory pilot scale processes or computer process simulations that are performed in existing facilities on the University of Utah campus in north-east Salt Lake City. These tasks are: (1) coupled fluidized-bed bitumen recovery and coked sand combustion; (2) water-based recovery of bitumen; (3) oil sand pyrolysis in a continuous rotary kiln reactor; (4) oil sand pyrolysis in a large diameter fluidized bed reactor; (5) oil sand pyrolysis in a small diameter fluidized bed reactor; (6) combustion of spent sand in a transport reactor; (7) recovery andmore » upgrading of oil sand bitumen using solvent extraction methods; (8) fixed-bed hydrotreating of Uinta Basin bitumens and bitumen-derived hydrocarbon liquids; (9) ebullieted bed hydrotreating of bitumen and bitumen derived liquids; (10) bitumen upgrading by hydropyrolysis; (11) evaluation of Utah`s major oil sand deposits for the production of asphalt, high-energy jet fuels and other specialty products; (12) characterization of the bitumens and reservoir rocks from the Uinta Basin oil sand deposits; (13) bitumen upgrading pilot plant recommendations; (14) liquid-solid separation and fine tailings thickening; (15) in-situ production of heavy oil from Uinta Basin oil sand deposits; (16) oil sand research and development group analytical facility; and (17) process economics. This volume contains reports on nine of these projects, references, and a bibliography. 351 refs., 192 figs., 65 tabs.« less
Possibility for ultra-bright electron beam acceleration in dielectric wakefield accelerators
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simakov, Evgenya I.; Carlsten, Bruce E.; Shchegolkov, Dmitry Yu.
2012-12-21
We describe a conceptual proposal to combine the Dielectric Wakefield Accelerator (DWA) with the Emittance Exchanger (EEX) to demonstrate a high-brightness DWA with a gradient of above 100 MV/m and less than 0.1% induced energy spread in the accelerated beam. We currently evaluate the DWA concept as a performance upgrade for the future LANL signature facility MaRIE with the goal of significantly reducing the electron beam energy spread. The preconceptual design for MaRIE is underway at LANL, with the design of the electron linear accelerator being one of the main research goals. Although generally the baseline design needs to bemore » conservative and rely on existing technology, any future upgrade would immediately call for looking into the advanced accelerator concepts capable of boosting the electron beam energy up by a few GeV in a very short distance without degrading the beam's quality. Scoping studies have identified large induced energy spreads as the major cause of beam quality degradation in high-gradient advanced accelerators for free-electron lasers. We describe simulations demonstrating that trapezoidal bunch shapes can be used in a DWA to greatly reduce the induced beam energy spread, and, in doing so, also preserve the beam brightness at levels never previously achieved. This concept has the potential to advance DWA technology to a level that would make it suitable for the upgrades of the proposed Los Alamos MaRIE signature facility.« less
New Mexico Liquid Metal αω -dynamo experiment: Most Recent Progress
NASA Astrophysics Data System (ADS)
Si, Jiahe; Sonnenfeld, Richard; Colgate, Art; Li, Hui
2017-10-01
The goal of the New Mexico Liquid Metal αω -dynamo experiment is to demonstrate a galactic dynamo can be generated through two phases, the ω-phase and α-phase by two semi-coherent flows in laboratory. We have demonstrated an 8-fold poloidal-to-toroidal flux amplification from differential rotation (the ω-effect) by minimizing turbulence in our apparatus. To demonstrate the α-effect, major upgrades are needed. The upgrades include building a helicity injection facility, mounting new 100hp motors and new sensors, designing a new data acquisition system capable of transmitting data from about 80 sensors in a high speed rotating frame with an overall 200kS/sec sampling rate. We hope the upgrade can be utilized to answer the question of whether a self-sustaining αω -dynamo can be implemented with a realistic lab fluid flow field, as well as to obtain more details to understand dynamo action in highly turbulent Couette flow.
APS deposition facility upgrades and future plans
NASA Astrophysics Data System (ADS)
Conley, Ray; Shi, Bing; Erdmann, Mark; Izzo, Scott; Assoufid, Lahsen; Goetze, Kurt; Mooney, Tim; Lauer, Kenneth
2014-09-01
The Advanced Photon Source (APS) has recently invested resources to upgrade or replace aging deposition systems with modern equipment. Of the three existing deposition systems, one will receive an upgrade, while two are being replaced. A design which adds a three-substrate planetary for the APS rotary deposition system is almost complete. The replacement for the APS large deposition system, dubbed the "Modular Deposition System", has been conceptually designed and is in the procurement process. Eight cathodes will sputter horizontally on mirrors up to 1.5 meters in length. This new instrument is designed to interface with ion-milling instruments and various metrology equipment for ion-beam figuring. A third linear machine, called the APS Profile Coating System, has two cathodes and is designed to accept substrates up to 200mm in length. While this machine is primarily intended for fabrication of figured KB mirrors using the profile-coating technique, it has also been used to produce multilayer monochromators for beamline use.
Experiences with tungsten coatings in high heat flux tests and under plasma load in ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Herrmann, A.; Greuner, H.; Fuchs, J. C.; de Marné, P.; Neu, R.; ASDEX Upgrade Team
2009-12-01
ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/2008 exploring tungsten as a first wall material in tokamaks. In the first phase, the heating power was restricted to 10 MW. It was increased to 15 MW in the second phase. During this operational period, a delamination of the 200 μm W-VPS coating happened at 2 out of 128 tiles of the outer divertor and an unscheduled opening was required. In the third phase, ASDEX Upgrade was operated with partly predamaged tiles and up to 15 MW heating power. The target load was actively controlled by N2-seeding. This paper presents the screening test of target tiles in the high heat flux test facility GLADIS, experiences with operation and detected damages of the outer divertor as well as the heat load to the outer divertor and the reasons for the toroidal asymmetry of the divertor load.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loisel, G., E-mail: gploise@sandia.gov; Lake, P.; Gard, P.
2016-11-15
At Sandia National Laboratories, the x-ray generator Manson source model 5 was upgraded from 10 to 25 kV. The purpose of the upgrade is to drive higher characteristics photon energies with higher throughput. In this work we present characterization studies for the source size and the x-ray intensity when varying the source voltage for a series of K-, L-, and M-shell lines emitted from Al, Y, and Au elements composing the anode. We used a 2-pinhole camera to measure the source size and an energy dispersive detector to monitor the spectral content and intensity of the x-ray source. As themore » voltage increases, the source size is significantly reduced and line intensity is increased for the three materials. We can take advantage of the smaller source size and higher source throughput to effectively calibrate the suite of Z Pulsed Power Facility crystal spectrometers.« less
76 FR 27169 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
.../11 27,518,418 20,833,179 01/01/16 06/01/16 Nashville, TN 03-03-C-01-SAN 2/17/11 83,075,730 65,058,035 03/01/06 03/01/06 San Diego, CA 09-15-C-01-BNA 2/17/11 11,287,500 6,196,434 06/01/17 09/01/16 Nashville, TN 06-07-C-06-BUR 2/18/11 41,346,265 42,946,265 04/01/13 06/01/13 Burbank, CA 09-09-C-01-BUR 2/18...
LONG-TERM DEMONSTRATION OF SORBENT ENHANCEMENT ADDITIVE TECHNOLOGY FOR MERCURY CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jason D. Laumb; Dennis L. Laudal; Grant E. Dunham
2011-05-27
Long-term demonstration tests of advanced sorbent enhancement additive (SEA) technologies have been completed at five coal-fired power plants. The targeted removal rate was 90% from baseline conditions at all five stations. The plants included Hawthorn Unit 5, Mill Creek Unit 4, San Miguel Unit 1, Centralia Unit 2, and Hoot Lake Unit 2. The materials tested included powdered activated carbon, treated carbon, scrubber additives, and SEAs. In only one case (San Miguel) was >90% removal not attainable. The reemission of mercury from the scrubber at this facility prevented >90% capture.
San Francisco floating STOLport study
NASA Technical Reports Server (NTRS)
1974-01-01
The operational, economic, environmental, social and engineering feasibility of utilizing deactivated maritime vessels as a waterfront quiet short takeoff and landing facility to be located near the central business district of San Francisco was investigated. Criteria were developed to evaluate each site, and minimum standards were established for each criterion. Predicted conditions at the two sites were compared to the requirements for each of the 11 criteria as a means of evaluating site performance. Criteria include land use, community structure, economic impact, access, visual character, noise, air pollution, natural environment, weather, air traffic, and terminal design.
ERIC Educational Resources Information Center
Bortolazzo, Julio L.
San Joaquin Delta College (California), planning on an enrollment increase of more than 10% annually, has estimated its minimum facility needs for an enrollment of approximately 7500 students by 1972. The gross cost per square foot is expected to be $25.00 for general construction and $38.50 for special construction. For an estimated total of…
1987-12-29
EMC, San Francisco CA, 16-18 July 1974, 76-84. 1-13. E. R. Uhlig, "Developmnent of Criteria for Protection ef NIKE -X Power Plant and Facilities...Interference Reduction and Electronic Compatibility, Armour Research Foundation of Illinois Institute of Technology (now IITRI), Chicago IL, October...Measuring Systems Susceptibility," Proceedings of the Eighth Tri-Service Conference on Electromagnetic Compatibility, Armour Research Foundation of
Aerospace Energy Systems Laboratory - Requirements and design approach
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1988-01-01
The NASA Ames/Dryden Flight Research Facility operates a mixed fleet of research aircraft employing NiCd batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has evolved over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-13
... installed at three existing compressor stations, a new meter station, and an upgrade at an existing regulator station, all located at existing DTI facilities in Pennsylvania. This EA will be used by the... Compressor Station in Jefferson/Indiana, Elk, and Clinton Counties, Pennsylvania. All construction would take...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
...'s existing Payson Gate Meter Station for the downstream Lake Side 2 Power Plant. No incremental... County: A second compressor package at its existing Thistle Creek Compressor Station; Replacement of... pressure; and Metering and ancillary facility upgrades at Questar's existing Payson Gate Meter Station. In...
78 FR 71635 - Federal Property Suitable as Facilities To Assist the Homeless
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
...; poor conditions; asbestos/lead; contact Interior for more info. Imperial Dam Camp House 1 2400 Imperial.../upgrades needed; asbestos/lead; contact Interior for more info. Bldg. 2172 Marine Corps Air Ground Task... exterior/interior wood damage; asbestos/lead; secured area; contact Navy for more info. Bldg. 2175 Marine...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
...] Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline Vapor... measures for new and upgraded gasoline dispensing facilities in the State. The September 18, 2009, SIP... .0953), entitled Vapor Return Piping for Stage II Vapor Recovery, for all new or improved gasoline tanks...
NASA Astrophysics Data System (ADS)
Goman, V. V.; Fedoreev, S. A.
2018-02-01
This report concerns the development trends of education in the field of the Mechatronics and Robotics at Nizhny Tagil Technological Institute (branch of Ural Federal University). The paper considers new teaching technologies, experience in upgrade of the laboratory facilities and some results of development Mechatronics and Robotics educational courses.
NASA Technical Reports Server (NTRS)
Dussling, Joseph John
2015-01-01
A brief history of the 8x6 Supersonic Wind Tunnel (SWT) and 9x15 Low Speed Wind Tunnel (LSWT) at NASA Glenn Research Center, Cleveland, Ohio is presented along with current capabilities and plans for future upgrades within the facility.
Gamma-Ray Effects Testing in Lawrence Livermore National Laboratory’s Nova Upgrade Facility
1992-03-01
However, the distribution of energy between neutrons and photons from the ICF pellet will be different then that from a thermonuclear bomb . In a...of the neutron energy to photons. Photons make up most of the energy released from a thermonuclear bomb (Glasstone, S., 1977:340-342). The neutrons
Avoiding Preconceptions in School Construction
ERIC Educational Resources Information Center
Maletz, Andrew
2012-01-01
An existing facility that is being upgraded or retrofitted today typically is 30 to 45 years old, often with limited natural light, antiquated mechanical systems and retrofitted technology. All too often at the outset of a project, the broader project goals--and even those narrower in scope--seem daunting or altogether impossible when staring at a…
Energy Systems Integration News | Energy Systems Integration Facility |
Grid Modernization Project Informed by ESIF Research The Hawaii Public Utilities Commission approved on (HECO) to upgrade its five island power grids. The plan describes the scope and estimated cost to update the energy networks of Hawaiian Electric, Maui Electric, and Hawaii Electric Light in the next five
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-19
... environmental impact statement or environmental assessment need be prepared for these amendments. If the... authorization to upgrade selected Emergency Action Levels based on Nuclear Energy Institute (NEI) 99-01... of NRC Regulatory Issue Summary 2003-18, Supplement 2, ``Use of Nuclear Energy Institute (NEI) 99-01...
Upgrade and Operation of the DNA Dust Erosion Test Facility
1990-11-01
Robert G. Oeding PDA Engineering 2975 Redhill Avenue Costa Mesa, CA 92626 November 1990 ,)TICI-i -LECTE NOV 2 7,19W Techical ReportD CONTRACT No. DNA...Engineering 2975 Redhill Avenue Costa Mesa, CA 92626 PDA-TR-1385-03-01 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING/MONITORING
NASA Astrophysics Data System (ADS)
Chiuchiolo, A.; Bajas, H.; Bajko, M.; Castaldo, B.; Consales, M.; Cusano, A.; Giordano, M.; Giloux, C.; Perez, J. C.; Sansone, L.; Viret, P.
2017-12-01
The magnets for the next steps in accelerator physics, such as the High Luminosity upgrade of the LHC (HL- LHC) and the Future Circular Collider (FCC), require the development of new technologies for manufacturing and monitoring. To meet the HL-LHC new requirements, a large upgrade of the CERN SM18 cryogenic test facilities is ongoing with the implementation of new cryostats and cryogenic instrumentation. The paper deals with the advances in the development and the calibration of fiber optic sensors in the range 300 - 4 K using a dedicated closed-cycle refrigerator system composed of a pulse tube and a cryogen-free cryostat. The calibrated fiber optic sensors (FOS) have been installed in three vertical cryostats used for testing superconducting magnets down to 1.9 K or 4.2 K and in the variable temperature test bench (100 - 4.2 K). Some examples of FOS measurements of cryostat temperature evolution are presented as well as measurements of strain performed on a subscale of High Temperature Superconducting magnet during its powering tests.
Diesel production from Fischer-Tropsch: the past, the present, and new concepts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dieter Leckel
2009-05-15
Fischer-Tropsch synthesis is technically classified into two categories, the high-temperature Fischer-Tropsch (HTFT) and the low-temperature Fischer-Tropsch (LTFT) processes. The criterion for this classification is the operating temperature of the synthesis, which ranges between 310-340{sup o}C for the HTFT process and 210-260{sup o}C for the LTFT process. A Fischer-Tropsch facility can be divided into roughly three sections, synthesis gas (syngas) generation, FT synthesis, and refining of the synthetic crude (syncrude). Fischer-Tropsch refineries differ regarding the product upgrading, and both transportation fuels and chemicals can be produced. Regarding the FT refinery history, the configuration of each refinery also reflects the requirements ofmore » the fuel specification at that time. This paper gives a condensed overview of how Fischer-Tropsch facilities changed during the last 70 years and focuses in particular on the diesel fuel produced. Some conceptual flow schemes are additionally presented with emphasis on the combined upgrading of the high boiling part of the FT product spectrum with liquids derived from coal pyrolysis. 52 refs., 14 figs., 12 tabs.« less
Application of Pressure-Based Wall Correction Methods to Two NASA Langley Wind Tunnels
NASA Technical Reports Server (NTRS)
Iyer, V.; Everhart, J. L.
2001-01-01
This paper is a description and status report on the implementation and application of the WICS wall interference method to the National Transonic Facility (NTF) and the 14 x 22-ft subsonic wind tunnel at the NASA Langley Research Center. The method calculates free-air corrections to the measured parameters and aerodynamic coefficients for full span and semispan models when the tunnels are in the solid-wall configuration. From a data quality point of view, these corrections remove predictable bias errors in the measurement due to the presence of the tunnel walls. At the NTF, the method is operational in the off-line and on-line modes, with three tests already computed for wall corrections. At the 14 x 22-ft tunnel, initial implementation has been done based on a test on a full span wing. This facility is currently scheduled for an upgrade to its wall pressure measurement system. With the addition of new wall orifices and other instrumentation upgrades, a significant improvement in the wall correction accuracy is expected.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fedurin, M.; Jing, Y.; Stratakis, D.
The Brookhaven National Laboratory. Accelerator Test Facility (BNL ATF) is currently undergoing a major upgrade (ATF-II). Together with a new location and much improved facilities, the ATF will see an upgrade in its major capabilities: electron beam energy and quality and CO 2 laser power. The electron beam energy will be increased in stages, first to 100-150 MeV followed by a further increase to 500 MeV. Combined with the planned increase in CO 2 laser power (from 1-100 TW), the ATF-II will be a powerful tool for Advanced Accelerator research. A high-brightness electron beam, produced by a photocathode gun, willmore » be accelerated and optionally delivered to multiple beamlines. Besides the energy range (up to a possible 500 MeV in the final stage) the electron beam can be tailored to each experiment with options such as: small transverse beam size (<10 um), short bunch length (<100 fsec) and, combined short and small bunch options. This report gives a detailed overview of the ATFII capabilities and beamlines configuration.« less
Utilization of the High Flux Isotope Reactor at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Selby, Douglas L; Bilheux, Hassina Z; Meilleur, Flora
2015-01-01
This paper addresses several aspects of the scientific utilization of the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR). Topics to be covered will include: 1) HFIR neutron scattering instruments and the formal instrument user program; 2) Recent upgrades to the neutron scattering instrument stations at the reactor, and 3) eMod a new tool for addressing instrument modifications and providing configuration control and design process for scientific instruments at HFIR and the Spallation Neutron Source (SNS). There are 15 operating neutron instrument stations at HFIR with 12 of them organized into a formal user program. Since the last presentationmore » on HFIR instruments at IGORR we have installed a Single Crystal Quasi-Laue Diffractometer instrument called IMAGINE; and we have made significant upgrades to HFIR neutron scattering instruments including the Cold Triple Axis Instrument, the Wide Angle Neutron Diffractometer, the Powder Diffractometer, and the Neutron Imaging station. In addition, we have initiated upgrades to the Thermal Triple Axis Instrument and the Bio-SANS cold neutron instrument detector system. All of these upgrades are tied to a continuous effort to maintain a high level neutron scattering user program at the HFIR. For the purpose of tracking modifications such as those mentioned and configuration control we have been developing an electronic system for entering instrument modification requests that follows a modification or instrument project through concept development, design, fabrication, installation, and commissioning. This system, which we call eMod, electronically leads the task leader through a series of questions and checklists that then identifies such things as ES&H and radiological issues and then automatically designates specific individuals for the activity review process. The system has been in use for less than a year and we are still working out some of the inefficiencies, but we believe that this will become a very effective tool for achieving the configuration and process control believed to be necessary for scientific instrument systems.« less
Langley Aerothermodynamic Facilities Complex: Enhancements and Testing Capabilities
NASA Technical Reports Server (NTRS)
Micol, J. R.
1998-01-01
Description, capabilities, recent upgrades, and utilization of the NASA Langley Research Center (LaRC) Aerothermodynamic Facilities Complex (AFC) are presented. The AFC consists of five hypersonic, blow-down-to-vacuum wind tunnels that collectively provide a range of Mach number from 6 to 20, unit Reynolds number from 0.04 to 22 million per foot and, most importantly for blunt configurations, normal shock density ratio from 4 to 12. These wide ranges of hypersonic simulation parameters are due, in part, to the use of three different test gases (air, helium, and tetrafluoromethane), thereby making several of the facilities unique. The Complex represents nearly three-fourths of the conventional (as opposed to impulse)-type hypersonic wind tunnels operational in this country. AFC facilities are used to assess and optimize the hypersonic aerodynamic performance and aeroheating characteristics of aerospace vehicle concepts and to provide benchmark aerodynamic/aeroheating data fr generating the flight aerodynamic databook and final design of the thermal protection system (TPS) (e.g., establishment of flight limitations not to exceed TPS design limits). Modifications and enhancements of AFC hardware components and instrumentation have been pursued to increase capability, reliability, and productivity in support of programmatic goals. Examples illustrating facility utilization in recent years to generate essentially all of the experimental hypersonic aerodynamic and aeroheating information for high-priority, fast-paced Agency programs are presented. These programs include Phase I of the Reusable Launch Vehicle (RLV) Advanced Technology Demonstrator, X-33 program, PHase II of the X-33 program, X-34 program, the Hyper-X program ( a Mach 5,7, and 10 airbreathing propulsion flight experiment), and the X-38 program (Experimental Crew Return Vehicle, X-CRV). Current upgrades/enchancements and future plans for the AFC are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Powell, Danny H; Jensen, Bruce A
2011-01-01
Improve protection of weapons-usable nuclear material from theft or diversion through the development and support of a nationwide sustainable and effective Material Control and Accountability (MC&A) program based on material measurement. The material protection, control, and accountability (MPC&A) cooperation has yielded significant results in implementing MC&A measurements at Russian nuclear facilities: (1) Establishment of MEM WG and MEMS SP; (2) Infrastructure for development, certification, and distribution of RMs; and (3) Coordination on development and implementation of MMs.
Icing simulation: A survey of computer models and experimental facilities
NASA Technical Reports Server (NTRS)
Potapczuk, M. G.; Reinmann, J. J.
1991-01-01
A survey of the current methods for simulation of the response of an aircraft or aircraft subsystem to an icing encounter is presented. The topics discussed include a computer code modeling of aircraft icing and performance degradation, an evaluation of experimental facility simulation capabilities, and ice protection system evaluation tests in simulated icing conditions. Current research focussed on upgrading simulation fidelity of both experimental and computational methods is discussed. The need for increased understanding of the physical processes governing ice accretion, ice shedding, and iced airfoil aerodynamics is examined.
Icing simulation: A survey of computer models and experimental facilities
NASA Technical Reports Server (NTRS)
Potapczuk, M. G.; Reinmann, J. J.
1991-01-01
A survey of the current methods for simulation of the response of an aircraft or aircraft subsystem to an icing encounter is presented. The topics discussed include a computer code modeling of aircraft icing and performance degradation, an evaluation of experimental facility simulation capabilities, and ice protection system evaluation tests in simulated icing conditions. Current research focused on upgrading simulation fidelity of both experimental and computational methods is discussed. The need for the increased understanding of the physical processes governing ice accretion, ice shedding, and iced aerodynamics is examined.
2012-06-01
Virginia Tech, 90. 51 exterior doors, he roamed the halls of the second floor peering into classrooms. Without saying a word, Cho entered the...carried out his actions in complete silence without saying a word. He gave no indication of rationale or motive during the entire incident that lasted...without saying a word, proceeded to open fire on the classroom. Goddard, the student who had called 9-1-1, was among the first to be shot. As he fell
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark A. Johnson
2012-06-29
Lineage Power and Verizon teamed up to address a DOE funding opportunity focused on improving the power conversion chain in telecommunications facilities and data centers. The project had three significant elements: the design and development of high efficiency and high power three-phase rectifiers by Lineage Power, design and development of software to optimize overall plant energy efficiency by Lineage Power, and a field trial in active Verizon telecommunications facilities where energy consumption was measured before and after efficiency upgrades.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the top level of the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Characterization and application of a broad bandwidth oscillator for the HELEN laser facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andrew, J.E.; Stevenson, R.M.; Bett, T.H.
1995-12-31
Preliminary investigations of a potential broad band oscillator for the HELEN laser facility and its proposed upgrade are described. The reasons for the need of broad bandwidth and the choice of commercial technology to achieve it are discussed. The characterization of the device and the diagnostics used for the investigations are described. Small signal amplification of the bandwidth by a glass amplifier was also performed along with investigations of the effect of various bandwidths on the far field beam quality when using random phase plates.
VISIR upgrade overview and status
NASA Astrophysics Data System (ADS)
Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina
2012-09-01
We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.
Design summary of a geostationary facility utilized as a communications platform
NASA Technical Reports Server (NTRS)
Barberis, N. J.; Brown, J. V.
1986-01-01
This paper describes the technical aspects of a geostationary platform facility that makes maximum use of the planned NASA space station and its elements, mainly the orbital maneuvering vehicle (OMV) and the orbital transfer vehicles (OTV). The platform design concept is described, with emphasis on the key technologies utilized to configure the platform. Key systems aspects include a design summary with discussion of the controls, telemetry, command and ranging, power, propulsion, control electronics, thermal control subsystems, and space station interfaces. The use of the facility as a communications platform is developed to demonstrate the attractiveness of the concept. The economic benefits are discussed, as well as the concept of servicing for payload upgrade.
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft with orbiter Atlantis on top touches down at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft gently lands its piggyback cargo orbiter Atlantis at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft with orbiter Atlantis on top arrives at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
NASA Astrophysics Data System (ADS)
Catherall, R.; Andreazza, W.; Breitenfeldt, M.; Dorsival, A.; Focker, G. J.; Gharsa, T. P.; J, Giles T.; Grenard, J.-L.; Locci, F.; Martins, P.; Marzari, S.; Schipper, J.; Shornikov, A.; Stora, T.
2017-09-01
The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engineering and operational equipment while continuing developments aim to ensure operations following a potential increase in primary beam intensity and energy. This paper outlines the principal technical changes incurred at ISOLDE by building on a similar publication of the facility upgrades by Kugler (2000 Hyperfine Interact. 129 23-42). It also provides an insight into future perspectives through a brief summary issues addressed in the HIE-ISOLDE design study Catherall et al (2013 Nucl. Instrum. Methods Phys. Res. B 317 204-207).
Macpherson, George S.; Bernstein, Janis
1980-01-01
Outer Continental Shelf (OCS) oil and gas exploration and development have been under way in the Pacific (Southern California) Region since 1966. During that time, there have been four Federal lease sales: in 1966, 1968, 1975 (Sale 35), and 1979 (Sale 48). Oil and gas production from three leases has been going on since 1968. It peaked in 1971 and now averages around 31,400 barrels of oil and 15.4 million cubic feet of gas per day. Discoveries on areas leased in the 1968 and 1975 sales have led to plans for eight new platforms to begin production in the early 1980's. Five platforms are in the eastern end of Santa Barbara Channel, one is in the western Channel, and two are in San Pedro Bay, south of Long Beach. Three rigs are doing exploratory drilling in the Region. The most recent estimates by the U.S. Geological Survey of remaining reserves for all identified fields in the Southern California Region are 695 million barrels of oil and 1,575 billion cubic feet of gas (January 1979). The USGS has also made risked estimates of economically recoverable oil and gas resources for all the leased tracts in the Region (March 1980). These risked estimates of economically recoverable resources are 394 billion barrels of oil and 1,295 billion cubic feet of gas. The USGS estimates of undiscovered recoverable resources for the entire Southern California OCS Region (January 1980) are 3,200 million barrels of oil and 3,400 billion cubic feet of gas. Because of the long history of oil and gas production in Southern California from wells onshore and in State waters, there are many existing facilities for the transportation, processing, and refining of oil and gas. Some of the expected new OCS production can be accommodated in these facilities. Four new onshore projects will be required. Two of these are under construction: (1) a 9.6-km (6-mi) onshore oil pipeline (capacity: 60,000 bpd) between Carpinteria (Santa Barbara County) and the existing Mobil-Rincon separation and treatment facility (Ventura County), and (2) a small supply base and dock (upgrade of existing facility) and a 0.4-hectare (1-acre) crude oil distribution facility in Long Beach (Los Angeles County), connected to landfall by a 3-km (1.8-mi) onshore pipeline. The two other facilities are awaiting permit approval: (1) a gas treatment plant at Las Flores Canyon (Santa Barbara County) and (2) a separation and treatment plant at Mandalay Beach (Ventura County) with 4 km (2.5 mi) of onshore pipeline on the same right-of-way from landfall to the plant and from the plant to an existing gas transmission line.
The GlueX Experiment: First Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fanelli, Cristiano
GlueX is a nuclear physics experiment located at the Thomas Jefferson National Accelerator Facility designed to study and understand the nature of confinement in QCD by mapping the spectrum of exotic mesons. The experiment will be able to probe new areas by using photoproduction, i.e. the scattering on nucleon of ~9 GeV linearly polarized photons derived from the recently upgraded CEBAF with a 12 GeV electron beam. Spring 2016 has been characterized by a continued detector commissioning and initial running at the full design energy. The current status of the GlueX detector performance and data collection will be discussed, withmore » a brief overview of first physics results, future run plans, and long term upgrades.« less
The high Beta cryo-modules and the associated cryogenic system for the HIE-ISOLDE upgrade at CERN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Delruelle, N.; Leclercq, Y.; Pirotte, O.
2014-01-29
The major upgrade of the energy and intensity of the existing ISOLDE and REX-ISOLDE radioactive ion beam facilities at CERN requires the replacement of most of the existing ISOLDE post-acceleration equipment by a superconducting linac based on quarter-wave resonators housed together with superconducting solenoids in a series of four high-β and two low-β cryo-modules. As well as providing optimum conditions for physics, the cryo-modules need to function under stringent vacuum and cryogenic conditions. We present the detail design and expected cryogenic performance of the high- β cryo-module together with the cryogenic supply and distribution system destined to service the completemore » superconducting linac.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
..., closures and coils and from graphic arts operations and the provision of sampling and testing facilities...; SDCAPCD Rule 67.16, Metal Container, Graphic Arts Operations; MBUAPCD Rule 205, Provision of Sampling and...
76 FR 6517 - San Luis & Rio Grande Railroad-Petition for a Declaratory Order
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-04
...). Specifically, the facility will be used to transfer containers and/or bags of contaminated dirt and debris from... dirt SLRG plans to transload and transport is subject to the CRA. The August decision also established...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... seq.); and having requested and received the views of various of the federal departments and other..., consisting of the following improvements and structures: Inspection and X-Ray Facilities Main Administrative...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.
The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less
Building a new space weather facility at the National Observatory of Athens
NASA Astrophysics Data System (ADS)
Kontogiannis, Ioannis; Belehaki, Anna; Tsiropoula, Georgia; Tsagouri, Ioanna; Anastasiadis, Anastasios; Papaioannou, Athanasios
2016-01-01
The PROTEAS project has been initiated at the Institute of Astronomy, Astrophysics, Space Applications and Remote Sensing (IAASARS) of the National Observatory of Athens (NOA). One of its main objectives is to provide observations, processed data and space weather nowcasting and forecasting products, designed to support the space weather research community and operators of commercial and industrial systems. The space weather products to be released by this facility, will be the result of the exploitation of ground-based, as well as space-borne observations and of model results and tools already available or under development by IAASARS researchers. The objective will be achieved through: (a) the operation of a small full-disk solar telescope to conduct regular observations of the Sun in the H-alpha line; (b) the construction of a database with near real-time solar observations which will be available to the community through a web-based facility (HELIOSERVER); (c) the development of a tool for forecasting Solar Energetic Particle (SEP) events in relation to observed solar eruptive events; (d) the upgrade of the Athens Digisonde with digital transceivers and the capability of operating in bi-static link mode and (e) the sustainable operation of the European Digital Upper Atmosphere Server (DIAS) upgraded with additional data sets integrated in an interface with the HELIOSERVER and with improved models for the real-time quantification of the effects of solar eruptive events in the ionosphere.
Aerospace energy systems laboratory: Requirements and design approach
NASA Technical Reports Server (NTRS)
Glover, Richard D.
1988-01-01
The NASA Ames-Dryden Flight Research Facility at Edwards, California, operates a mixed fleet of research aircraft employing nickel-cadmium (NiCd) batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has developed over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.
Incident Involving 30-Ah Li-ion Cell at NASA Glenn Research Center
NASA Technical Reports Server (NTRS)
Bennett, William
2006-01-01
The key lesson learned from the February 17, 2006 cell explosion incident is that PC-based test-systems, even those having built-in watchdog monitors, can lose control and malfunction. In the case of lithiumion cell/battery testing, the stored energy can be released explosively causing considerable injury and damage to facilities. The investigation showed that although the Arbin system has a built-in watchdog monitor, the circumstances of the incident defeated the action of the watchdog and allowed the cycler to continue operation without control. An upgrade to the most recent version of Arbin software (version 4) was provided as a fix to the presumed control problem. This upgrade included newer EPROM s for the cycler microprocessor. Investigation revealed that similar incidents have occurred at other NASA centers with a variety of PC-based test instruments. JPL suffered an incident with Maccor testers and the GRC fuel cell group observed similar problems with LabView software. This is not exclusively an Arbin problem, but an issue with all PC-based systems. In this incident, it was fortunate that the event occurred after-hours with no-one in the room. The facility arrangement placed control consoles adjacent to the test chamber doors. Had someone been in the room during the event, they would have been exposed to hot debris and toxic combustion products. It was also fortunate that the exploded cell stayed inside the chamber after the door was forced open. If the cell had been ejected into the room it could have caused serious facility damage by impact and possibly caused a fire in the facility.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... operate a new 15,000-horsepower (hp) electric compressor station (CS 32) along its existing 26-inch... compressor station (CS 18) at MP 668.8; and upgrade existing pipeline facilities, all located in Orange... would be confined to the existing compressor station. The EA Process The National Environmental Policy...
Status and Perspectives of the INFN-LNS In-Flight Fragment Separator
NASA Astrophysics Data System (ADS)
Russotto, P.; Calabretta, L.; Cardella, G.; Cosentino, G.; De Filippo, E.; Gnoffo, B.; La Cognata, M.; Martorana, N. S.; Pagano, E. V.; Pizzone, R. G.; Quattrocchi, L.; Romano, S.; Russo, A. D.; Santonocito, D.
2018-05-01
In the last 15 years the FRIBs@LNS facility has successfully produced Radioactive Ion Beams using the In-Flight technique. We report on the current status and future perspectives opened by FRAISE, a new fragment separator that will be build in connection with the upgrade of Superconducting Cyclotron of the INFN-LNS laboratories.
Study of data entry requirements at Marshall Space Flight Computation Center
NASA Technical Reports Server (NTRS)
Sherman, G. R.
1975-01-01
An economic and systems analysis of a data center was conducted. Current facilities for data storage of documentation are shown to be inadequate and outmoded for efficient data handling. Redesign of documents, condensation of the keypunching operation, upgrading of hardware, and retraining of personnel are the solutions proposed to improve the present data system.
VLTI: First Light for the Second Generation
NASA Astrophysics Data System (ADS)
Woillez, J.; Gonté, F.; Abad, J. A.; Abadie, S.; Abuter, R.; Accardo, M.; Acuña, M.; Alonso, J.; Andolfato, L.; Avila, G.; Barriga, P. J.; Beltran, J.; Berger, J.-P.; Bollados, C.; Bourget, P.; Brast, R.; Bristow, P.; Caniguante, L.; Castillo, R.; Conzelmann, R.; Cortes, A.; Delplancke, F.; Dell Valle, D.; Derie, F.; Diaz, A.; Donoso, R.; Duhoux, Ph.; Dupuy, C.; Elao, C.; Egner, S.; Fuenteseca, E.; Fernandez, R.; Gaytan, D.; Glindemann, A.; Gonzales, J.; Guisard, S.; Hagenauer, P.; Haimerl, A.; Heinz, V.; Henriquez, J. P.; van der Heyden, P.; Hubin, N.; Huerta, R.; Jochum, L.; Kirchbauer, J.-P.; Leiva, A.; Lévêque, S.; Lizon, J.-P.; Luco, F.; Mardones, P.; Mellado, A.; Mérand, A.; Osorio, J.; Ott, J.; Pallanca, L.; Pavez, M.; Pasquini, L.; Percheron, I.; Pirard, J.-F.; Phan, D. T.; Pineda, J. C.; Pino, A.; Poupar, S.; Ramírez, A.; Reinero, C.; Riquelme, M.; Romero, J.; Rivinius, Th.; Rojas, C.; Rozas, F.; Salgado, F.; Schöller, M.; Schuhler, N.; Siclari, W.; Stephan, C.; Tamblay, R.; Tapia, M.; Tristram, K.; Valdes, G.; de Wit, W.-J.; Wright, A.; Zins, G.
2015-12-01
The Very Large Telescope Interferometer (VLTI) stopped operation on 4 March 2015 with the objective of upgrading its infrastructure in preparation for the second generation VLTI instruments GRAVITY and MATISSE. A brief account of the eight bustling months it took our interferometer to metamorphose into its second generation, under the supervision of the VLTI Facility Project, is presented.
The 21st-Century Learning Environment
ERIC Educational Resources Information Center
Kennedy, Mike
2011-01-01
Step into a classroom in the 21st century, and the odds are it won't look all that different from one in the 20th century. One decade into the 2000s, many schools and universities have been frustrated in their efforts to upgrade their facilities and resources because of shrinking budgets. But even with the ailing economy, some education…
75 FR 4407 - Science Board to the Food and Drug Administration; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... subcommittee reviewing research at the Center for Food Safety and Applied Nutrition. The Science Board will... appropriate research agenda, and on upgrading its scientific and research facilities to keep pace with these... scientific research programs. Date and Time: The meeting will be held on Monday, February 22, 2010, from 8 a...
2001-02-24
[Photo courtesy of Boeing photographer Bob Williams.] The orbiter Columbia, atop a modified Boeing 747, rolls under protective cover at Palmdale, Calif. Columbia has been undergoing modifications and upgrades at Boeing’s Orbiter Assembly Facility in Palmdale and is ready to return to Kennedy Space Center. Ferry preparations and the flight plan are contingent upon weather conditions in California and enroute to Florida.
1991-05-01
schedule for construction, upgrading or operation of wastewater treatment facilities or any other environmental programs, which may effect storm water quality of...if the storm water quality may be similar. c. Two sets of samples are required to be collected: (1) A grab during the first 30 minutes of the rainfall
Yu-Mei Hsu; Andrzej Bytnerowicz
2015-01-01
NO2 and SO2 are the primary pollutants produced by industrial facilities of the Athabasca Oil sand Region (AOSR), Alberta, Canada. The major emission sources are the upgrader stacks for SO2 and stacks, mine fleets and vehicles for NO2. After emitting from the sources, NO
PSL Icing Facility Upgrade Overview
NASA Technical Reports Server (NTRS)
Griffin, Thomas A.; Dicki, Dennis J.; Lizanich, Paul J.
2014-01-01
The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, the PSL is capable of simulating icing events at altitude in a groundtest facility. The system was designed to operate at altitudes from 4,000 to 40,000 ft at Mach numbers up to 0.8M and inlet total temperatures from -60 to +15 degF. This paper and presentation will be part of a series of presentations on PSL Icing and will cover the development of the icing capability through design, developmental testing, installation, initial calibration, and validation engine testing. Information will be presented on the design criteria and process, spray bar developmental testing at Cox and Co., system capabilities, and initial calibration and engine validation test. The PSL icing system was designed to provide NASA and the icing community with a facility that could be used for research studies of engine icing by duplicating in-flight events in a controlled ground-test facility. With the system and the altitude chamber we can produce flight conditions and cloud environments to simulate those encountered in flight. The icing system can be controlled to set various cloud uniformities, droplet median volumetric diameter (MVD), and icing water content (IWC) through a wide variety of conditions. The PSL chamber can set altitudes, Mach numbers, and temperatures of interest to the icing community and also has the instrumentation capability of measuring engine performance during icing testing. PSL last year completed the calibration and initial engine validation of the facility utilizing a Honeywell ALF502-R5 engine and has duplicated in-flight roll back conditions experienced during flight testing. This paper will summarize the modifications and buildup of the facility to accomplish these tests.
5. Photographic copy of engineering drawing showing plans, elevation and ...
5. Photographic copy of engineering drawing showing plans, elevation and section of Deluge Water System, including reservior (4316), Pump House (4317), and water tower. Job No. Muroc A(5-ll), Military Construction, San Bernardino-Mojave Area, San Bernardino, California: Muroc Bombing Range, Muroc Lake, California.; Additional Facilities for Materiel Center Flight Test Base, Water Supply System, Plans and Sections, Sheet 5 of 10, May 1943. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, Deluge Water Pumping Station, Near Second & D Streets, Boron, Kern County, CA
Thin and thick targets for radioactive ion beam production at SPIRAL1 facility
NASA Astrophysics Data System (ADS)
Jardin, P.; Bajeat, O.; Delahaye, P.; Dubois, M.; Kuchi, V.; Maunoury, L.
2018-05-01
The upgrade of the Système de Production d'Ions Radioactifs Accélérés en Ligne (SPIRAL1) facility will deliver its new Radioactive Ion Beams (RIB) by summer 2017. The goal of the upgrade is an improvement of the performances of the installation in terms of isotopes species and ion charge states [1]. Ion beams are produced using the Isotope Separator On Line Method, consisting in an association of a primary beam of stable ions, a hot target and an ion source. The primary beam impinges on the material of the target. Radioactive isotopes are produced by nuclear reactions and propagate up to the source, where they are ionized and accelerated to create a RIB. One advantage of SPIRAL1 driver is the variety of its available primary beams, from carbon to uranium with energies up to 95 MeV/A. Within the SPIRAL1 upgrade, they will be combined with targets made of a large choice of materials, extending in this way the number of possible nuclear reactions (fusion-evaporation, transfer, fragmentation) for producing a wider range of isotopes, up to regions of the nuclide chart still scarcely explored. Depending on the reaction process, on the collision energy and on the primary beam power, thin and thick targets are used. As their functions can be different, their design must cope with specific constraints which will be described. After a presentation of the goals of present and future SPIRAL1 Target Ion Source System, the main target features, studies and designs under progress are presented.
NASA Technical Reports Server (NTRS)
1971-01-01
On or about 24 April 1971, the San Marco-C spacecraft will be launched from the San Marco Range located off the coast of Kenya, Africa, by a Scout launch vehicle. The launch will be conducted by an Italian crew. The San Marco-C is the third cooperative satellite project between Italy and the United States. The first such cooperative project resulted in the San Marco-1 satellite which was launched into orbit from the Wallops Island Range with a Scout vehicle on 15 December 1964. The successful launch demonstrated the readiness of the Italian Centro Ricerche Aerospaziuli (CRA) launch crews to launch the Scout vehicle and qualified the basic spacecraft design. The second in the series of cooperative satellite launches was the San Marco-II which was successfully launched into orbit from the San Marco Range on 26 April 1967. This was the first Scout launch from the San Marco Range. The San Marco-II carried the same accelerometer as San Marco-1, but the orbit permitted the air drag to be studied in detail in the equatorial region. The successful launch also served to qualify the San Marco Range as a reliable facility for future satellite launches, and has since been used for the successful launch of SAS-A (Explorer 42). This cooperative project has been implemented jointly by the Italian Space Commission and NASA. The CRA provided the spacecraft, its subsystems, and an air drag balance; Goddard Space Flight Center (GSFC) provided an omegatron and a neutral mass spectrometer, technical consultation and support. In addition, NASA provided the Scout launch vehicle. The primary scientific objective of the San Marco-C is to obtain, by measurement, a description of the equatorial neutral-particle atmosphere in terms of its density, com- position, and temperature at altitudes of 200 km and above, and to obtain a description of variations that result from solar and geomagnetic activities. The secondary scientific objective is to investigate the interdependence of three neutral-density-measurement techniques from one spacecraft: direct particle detection, direct drag, and integrated drag.
NASA Technical Reports Server (NTRS)
Vane, Gregg (Editor)
1987-01-01
The papers in this document were presented at the Imaging Spectroscopy 2 Conference of the 31st International Symposium on Optical and Optoelectronic Applied Science and Engineering, in San Diego, California, on 20 and 21 August 1987. They describe the design and performance of the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) sensor and its subsystems, the ground data processing facility, laboratory calibration, and first results.
Summary of breakout session f: facility and equipment decontamination strategies.
Norwood, Laurie P; Suvarna, Kalavati
2011-01-01
CONFERENCE PROCEEDING Proceedings of the PDA/FDA Adventitious Viruses in Biologics: Detection and Mitigation Strategies Workshop in Bethesda, MD, USA; December 1-3, 2010 Guest Editors: Arifa Khan (Bethesda, MD), Patricia Hughes (Bethesda, MD) and Michael Wiebe (San Francisco, CA).
Subscale Flight Testing for Aircraft Loss of Control: Accomplishments and Future Directions
NASA Technical Reports Server (NTRS)
Cox, David E.; Cunningham, Kevin; Jordan, Thomas L.
2012-01-01
Subscale flight-testing provides a means to validate both dynamic models and mitigation technologies in the high-risk flight conditions associated with aircraft loss of control. The Airborne Subscale Transport Aircraft Research (AirSTAR) facility was designed to be a flexible and efficient research facility to address this type of flight-testing. Over the last several years (2009-2011) it has been used to perform 58 research flights with an unmanned, remotely-piloted, dynamically-scaled airplane. This paper will present an overview of the facility and its architecture and summarize the experimental data collected. All flights to date have been conducted within visual range of a safety observer. Current plans for the facility include expanding the test volume to altitudes and distances well beyond visual range. The architecture and instrumentation changes associated with this upgrade will also be presented.
Radiation shielding design of a new tomotherapy facility.
Zacarias, Albert; Balog, John; Mills, Michael
2006-10-01
It is expected that intensity modulated radiation therapy (IMRT) and image guided radiation therapy (IGRT) will replace a large portion of radiation therapy treatments currently performed with conventional MLC-based 3D conformal techniques. IGRT may become the standard of treatment in the future for prostate and head and neck cancer. Many established facilities may convert existing vaults to perform this treatment method using new or upgraded equipment. In the future, more facilities undoubtedly will be considering de novo designs for their treatment vaults. A reevaluation of the design principles used in conventional vault design is of benefit to those considering this approach with a new tomotherapy facility. This is made more imperative as the design of the TomoTherapy system is unique in several aspects and does not fit well into the formalism of NCRP 49 for a conventional linear accelerator.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, James
Strategic energy management (SEM) focuses on achieving energy-efficiency improvements through systematic and planned changes in facility operations, maintenance, and behaviors (OM&B) and capital equipment upgrades in large energy-using facilities, including industrial buildings, commercial buildings, and multi-facility organizations such as campuses or communities. Facilities can institute a spectrum of SEM actions, ranging from a simple process for regularly identifying energy-savings actions, to establishing a formal, third-party recognized or certified SEM framework for continuous improvement of energy performance. In general, SEM programs that would be considered part of a utility program will contain a set of energy-reducing goals, principles, and practices emphasizingmore » continuous improvements in energy performance or savings through energy management and an energy management system (EnMS).« less
Kang’a, Samuel G.; Muthee, Veronica M.; Liku, Nzisa; Too, Diana; Puttkammer, Nancy
2016-01-01
The Ministry of Health (MoH) rollout of electronic medical record systems (EMRs) has continuously been embraced across health facilities in Kenya since 2012. This has been driven by a government led process supported by PEPFAR that recommended standardized systems for facilities. Various strategies were deployed to assure meaningful and sustainable EMRs implementation: sensitization of leadership; user training, formation of health facility-level multi-disciplinary teams; formation of county-level Technical Working Groups; data migration; routine data quality assessments; point of care adoption; successive release of software upgrades; and power provision. Successes recorded include goodwill and leadership from the county management (22 counties), growth in the number of EMR trained users (2561 health care workers), collaboration in among other things, data migration(90 health facilities completed) and establishment of county TWGs (13 TWGs). Sustenance of EMRs demand across facilities is possible through; county TWGs oversight, timely resolution of users’ issues and provision of reliable power. PMID:28269864
Kang'a, Samuel G; Muthee, Veronica M; Liku, Nzisa; Too, Diana; Puttkammer, Nancy
2016-01-01
The Ministry of Health (MoH) rollout of electronic medical record systems (EMRs) has continuously been embraced across health facilities in Kenya since 2012. This has been driven by a government led process supported by PEPFAR that recommended standardized systems for facilities. Various strategies were deployed to assure meaningful and sustainable EMRs implementation: sensitization of leadership; user training, formation of health facility-level multi-disciplinary teams; formation of county-level Technical Working Groups; data migration; routine data quality assessments; point of care adoption; successive release of software upgrades; and power provision. Successes recorded include goodwill and leadership from the county management (22 counties), growth in the number of EMR trained users (2561 health care workers), collaboration in among other things, data migration(90 health facilities completed) and establishment of county TWGs (13 TWGs). Sustenance of EMRs demand across facilities is possible through; county TWGs oversight, timely resolution of users' issues and provision of reliable power.
CLARA conceptual design report
NASA Astrophysics Data System (ADS)
Clarke, J. A.; Angal-Kalinin, D.; Bliss, N.; Buckley, R.; Buckley, S.; Cash, R.; Corlett, P.; Cowie, L.; Cox, G.; Diakun, G. P.; Dunning, D. J.; Fell, B. D.; Gallagher, A.; Goudket, P.; Goulden, A. R.; Holland, D. M. P.; Jamison, S. P.; Jones, J. K.; Kalinin, A. S.; Liggins, W.; Ma, L.; Marinov, K. B.; Martlew, B.; McIntosh, P. A.; McKenzie, J. W.; Middleman, K. J.; Militsyn, B. L.; Moss, A. J.; Muratori, B. D.; Roper, M. D.; Santer, R.; Saveliev, Y.; Snedden, E.; Smith, R. J.; Smith, S. L.; Surman, M.; Thakker, T.; Thompson, N. R.; Valizadeh, R.; Wheelhouse, A. E.; Williams, P. H.; Bartolini, R.; Martin, I.; Barlow, R.; Kolano, A.; Burt, G.; Chattopadhyay, S.; Newton, D.; Wolski, A.; Appleby, R. B.; Owen, H. L.; Serluca, M.; Xia, G.; Boogert, S.; Lyapin, A.; Campbell, L.; McNeil, B. W. J.; Paramonov, V. V.
2014-05-01
This report describes the conceptual design of a proposed free electron laser test facility called CLARA that will be a major upgrade to the existing VELA accelerator test facility at Daresbury Laboratory in the UK. CLARA will be able to test a number of new free electron laser schemes that have been proposed but require a proof of principle experiment to confirm that they perform as predicted. The primary focus of CLARA will be on ultra short photon pulse generation which will take free electron lasers into a whole new regime, enabling a new area of photon science to emerge.
2016-11-15
During a ribbon cutting ceremony in the high bay of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, center director Bob Cabana, far left, is joined by Bill Dowdell, Kennedy's International Space Station technical director, Josephine Burnett, director of Exploration Research and Technology, Andy Allen, Jacobs vice president and general manager and Test and Operations Support Contract program manager, and Jeff McAlear, Jacobs director of Processing Services. The event celebrated completion of facility modifications to improve processing and free up zones tailored to a variety of needs supporting a robust assortment of space-bound hardware including NASA programs and commercial space companies.
2017-02-12
Since the days of Gemini all of America’s human spaceflight programs have been controlled by men and women stationed in one of several flight control rooms at NASA’s Johnson Space Center in Houston: the International Space Station flight controllers recently moved into an upgraded facility in the room that hosted the teams during the first manned flights of Apollo and the space shuttle. Here’s a tour of “Mission Control Houston” through the years, from its first generation through the facility ready for the flights of Orion, the spacecraft that will take humans farther into space than they’ve ever gone before.
NASA Glenn Propulsion Systems Lab (PSL) Icing Facility Update
NASA Technical Reports Server (NTRS)
Thomas, Queito P.
2015-01-01
The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, PSL is capable of simulation of in-flight icing events in a ground test facility. The system was designed to operate at altitudes from 4,000 ft. to 40,000 ft. at Mach numbers up to 0.8M and inlet total temperatures from -60F to +15F.
Successful MPPF Pneumatics Verification and Validation Testing
2017-03-28
Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. To the left are several pneumatic panels. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.
Modernization of the Caltech/USGS Southern California Seismic Network
NASA Astrophysics Data System (ADS)
Bhadha, R.; Devora, A.; Hauksson, E.; Johnson, D.; Thomas, V.; Watkins, M.; Yip, R.; Yu, E.; Given, D.; Cone, G.; Koesterer, C.
2009-12-01
The USGS/ANSS/ARRA program is providing Government Furnished Equipment (GFE), and two year funding for upgrading the Caltech/USGS Southern California Seismic Network (SCSN). The SCSN is the modern digital ground motion seismic network in southern California that monitors seismicity and provides real-time earthquake information products such as rapid notifications, moment tensors, and ShakeMap. The SCSN has evolved through the years and now consists of several well-integrated components such as Short-Period analog, TERRAscope, digital stations, and real-time strong motion stations, or about 300 stations. In addition, the SCSN records data from about 100 stations provided by partner networks. To strengthen the ability of SCSN to meet the ANSS performance standards, we will install GFE and carry out the following upgrades and improvements of the various components of the SCSN: 1) Upgrade of dataloggers at seven TERRAscope stations; 2) Upgrade of dataloggers at 131 digital stations and upgrade broadband sensors at 25 stations; 3) Upgrade of SCSN metadata capabilities; 4) Upgrade of telemetry capabilities for both seismic and GPS data; and 5) Upgrade balers at stations with existing Q330 dataloggers. These upgrades will enable the SCSN to meet the ANSS Performance Standards more consistently than before. The new equipment will improve station uptimes and reduce maintenance costs. The new equipment will also provide improved waveform data quality and consequently superior data products. The data gaps due to various outages will be minimized, and ‘late’ data will be readily available through retrieval from on-site storage. Compared to the outdated equipment, the new equipment will speed up data delivery by about 10 sec, which is fast enough for earthquake early warning applications. The new equipment also has about a factor of ten lower consumption of power. We will also upgrade the SCSN data acquisition and data center facilities, which will improve the SCSN performance and metadata availability. We will improve existing software to facilitate the update of metadata, and to improve the interoperability between SeisNetWatch and our database of metadata. The improved software will also be made available to other regional networks as part of the CISN software distribution. These upgrades, will greatly improve the robustness of the SCSN, and facilitate higher quality and more reliable earthquake monitoring than was available before in southern California. The modernized SCSN will contribute to more coordinated search and rescue as well as economic resilience following a major earthquake by providing accurate earthquake information, and thus facilitate rapid deployment of field crews and rapid business resumption. Further, advances in seismological research will be facilitated by the high quality seismic data that will be collected in one of the most seismically active areas in the contiguous US.
NASA Technical Reports Server (NTRS)
Hughes, Mark S.; Hebert, Phillip W.; Davis, Dawn M.; Jensen, Scott L.; Abell, Frederick K., Jr.
2004-01-01
The John C. Stennis Space Center (SSC) provides test operations services to a variety of customers, including NASA, DoD, and commercial enterprises for the development of current and next-generation rocket propulsion systems. Many of these testing services are provided in the E-Complex test facilities composed of three active test stands (E1, E2, & E3) and 7 total test positions. Each test position is outfitted with unique sets of data acquisition and controls hardware and software that record both facility and test article data and enable safe operation of the test facility. This paper addresses each system in more detail including efforts to upgrade hardware and software.
1998-09-27
KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft rolls to a stop with its piggyback cargo orbiter Atlantis at the Shuttle Landing Facility. In the background is the Vehicle Assembly Building. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
1998-09-27
KENNEDY SPACE CENTER, FLA. -- Stairs are rolled to the forward opening of the Shuttle Carrier Aircraft with its piggyback cargo, the orbiter Atlantis after it rolls to a stop at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999
Earth observation taken by the Expedition 35 crew
2013-04-23
ISS035-E-27265 (23 April 2013) --- This detailed photo, taken by one of the Expedition 35 crew members aboard the Earth-orbiting International Space Station, features the metropolitan areas of San Diego, California, USA; and Tijuana, Baja California, Mexico. Together they form an international conurbation that crosses the USA-Mexico border (white line) at the northern end of the peninsula of Baja California near the city of San Ysidro, CA. Urban and suburban areas appear a light gray, speckled with white rooftops indicating large industrial and commercial buildings and centers. Vegetated areas ? parks, golf courses, and the foothills of nearby mountains ? appear green, in contrast to the tan and dark brown of exposed soils and bedrock in highland areas. The San Diego-Tijuana conurbation also includes the cities of Chula Vista, Carlsbad, San Marcos, National City in the USA; and Tecate, and Rosarito Beach in Mexico. The combined population of the region is approximately 5 million according to 2010 census information from both the USA and Mexico. The city of Coronado, CA, situated on an artificial peninsula across the bay from San Diego, is both a popular beach resort and the location of U.S. Navy air station and training facilities. Point Loma defines the western boundary of San Diego Bay, and is part of the city of San Diego. While the northern half of the Point Loma peninsula hosts various residential communities, the southern half is federal land occupied by US Navy installations, the Fort Rosecrans National Cemetery and the Cabrillo National Monument that marks the landing of the first European on the west coast of the United States.
ERIC Educational Resources Information Center
Hardy, Lawrence
2001-01-01
In an era of high-stakes testing and prescriptive teaching styles, a San Diego charter high school embraces project learning, multilevel classrooms, and video portfolios of student work. The school lacks dining, music, and athletic facilities, but features hefty teacher salaries, student freedom, and real-world problem solving. (MLH)
The freight landscape : using secondary data sources to describe metropolitan freight flows.
DOT National Transportation Integrated Search
2010-01-01
Freight flows depend on the spatial organization of freight supply and demand, and on the transportation facilities within the metropolitan area. We use network model data for both the Los Angeles region and San Francisco region, and estimate two set...
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Brien, Nicholas
2014-08-15
The paper describes Soitecs project to plan,install,qualify and ramp a high volume CPV module manufactruing facility in Southern California. Soitec’s CPV module factory in San Diego was planned with an annual production capacity of 280MWDC. It was scheduled to be operational by the first quarter of 2013, and was expected to create several hundred direct and indirect jobs in the San Diego region. From ground breaking to facility readiness was completed in six months. This enabled the docking of equipment in the Q3’12 time frame. The first 140 MW of capacity was ready for operation in Q4’12. Production of themore » CX-M500 modules started in Q4 2012. The line yield and factory capacity were ramped in 2013. The annual production capacity demonstration was successfully completed in Q2 2014. The modules manufactured at the plant were used to supply utility scale demand in the US and also world markets.« less
Microplastic contamination in the San Francisco Bay, California, USA.
Sutton, Rebecca; Mason, Sherri A; Stanek, Shavonne K; Willis-Norton, Ellen; Wren, Ian F; Box, Carolynn
2016-08-15
Despite widespread detection of microplastic pollution in marine environments, data describing microplastic abundance in urban estuaries and microplastic discharge via treated municipal wastewater are limited. This study presents information on abundance, distribution, and composition of microplastic at nine sites in San Francisco Bay, California, USA. Also presented are characterizations of microplastic in final effluent from eight wastewater treatment plants, employing varying treatment technologies, that discharge to the Bay. With an average microplastic abundance of 700,000particles/km(2), Bay surface water appears to have higher microplastic levels than other urban waterbodies sampled in North America. Moreover, treated wastewater from facilities that discharge into the Bay contains considerable microplastic contamination. Facilities employing tertiary filtration did not show lower levels of contamination than those using secondary treatment. As textile-derived fibers were more abundant in wastewater, higher levels of fragments in surface water suggest additional pathways of microplastic pollution, such as stormwater runoff. Copyright © 2016 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bucholz, J.A.
The High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory is in the midst of a massive upgrade program to enhance experimental facilities. The reactor presently has four horizontal experimental beam tubes, all of which will be replaced or redesigned. The HB-2 beam tube will be enlarged to support more guide tubes, while the HB-4 beam tube will soon include a cold neutron source.
2012-11-01
the most common. Japanese honeysuckle and Chinese tallow are limited to are- as along the fence line, and mimosa was only found in two locations at the...HAWKINSVILLE AFSSS Scientific Name Common Name Albizia julibrissin* mimosa Ampelopsis arborea peppervine Andropogon virginicus broomsedge bluestem
Visitor perceptions of the benefits of local park
Deborah Kerstetter; Andrew Mowen; Nathan Trauntvein; Toni Leichty; Nuno Rubiero
2009-01-01
Recent research regarding the perceived benefits of local parks has been limited, posing a problem for recreation and park directors who must promote the value of and gain support for aging park facilities. To collect evidence concerning the value of local parks and the impact of park upgrades, we conducted a study with one local park to (a) document behavioral changes...
1992-07-01
methodologies ; software performance analysis; software testing; and concurrent languages. Finally, efforts in algorithms, which are primarily designed to upgrade...These codes provide a powerful research tool for testing new concepts and designs prior to experimental implementation. DoE’s laser program has also...development, and specially designed production facilities. World leadership in bth non -fluorinated and fluorinated materials resides in the U.S. but Japan
ERIC Educational Resources Information Center
Bryant, Donna; Maxwell, Kelly; Taylor, Karen; Poe, Michele; Peisner-Feinberg, Ellen; Bernier, Kathleen
The primary goal of Smart Start is to ensure that all children enter school healthy and prepared to succeed. Smart Start has funded a variety of technical assistance (TA) activities to improve child care, including on-site technical assistance, quality improvement and facility grant, teacher education scholarships, license upgrades, teacher salary…
ERIC Educational Resources Information Center
Vernez, Georges; Culbertson, Shelly; Constant, Louay
2014-01-01
The Kurdistan Regional Government (KRG) began an ambitious reform of the Kurdistan Region of Iraq's (KRI's) kindergarten through grade 12 (K-12) education system beginning in 2007 in an effort to modernize the curriculum, upgrade school facilities, and raise the quality of instruction. In 2010, RAND was asked to conduct a one-year study to assess…
Vehicle Assembly Building (VAB)
2017-09-27
NASA's Vehicle Assembly Building at Kennedy Space Center in Florida was used to assemble and house American-crewed launch vehicles from 1968 to 2011. AT 3,684,883 cubic meters, it is one of the largest buildings in the world by volume. Inside the facility, High Bay 3 is being upgraded and modified to support processing of the agency's Space Launch System rocket and Orion spacecraft.
New Phone System Coming to NCI Campus at Frederick | Poster
By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current
Smiths Medical Medfusion 3010a syringe pump may overinfuse if software is outdated.
2010-04-01
Smiths Medical Medfusion 3010a syringe pumps that aren't equipped with the latest software version (2.0.6) could overinfuse if the "recall last settings" function is used following an infusion in volume/time mode. If your facility has pumps equipped with software versions older than 2.0.6, contact Smiths Medical to obtain an upgrade.
Hybrid Wing Body Aircraft Acoustic Test Preparations and Facility Upgrades
NASA Technical Reports Server (NTRS)
Heath, Stephanie L.; Brooks, Thomas F.; Hutcheson, Florence V.; Doty, Michael J.; Haskin, Henry H.; Spalt, Taylor B.; Bahr, Christopher J.; Burley, Casey L.; Bartram, Scott M.; Humphreys, William M.;
2013-01-01
NASA is investigating the potential of acoustic shielding as a means to reduce the noise footprint at airport communities. A subsonic transport aircraft and Langley's 14- by 22-foot Subsonic Wind Tunnel were chosen to test the proposed "low noise" technology. The present experiment studies the basic components of propulsion-airframe shielding in a representative flow regime. To this end, a 5.8-percent scale hybrid wing body model was built with dual state-of-the-art engine noise simulators. The results will provide benchmark shielding data and key hybrid wing body aircraft noise data. The test matrix for the experiment contains both aerodynamic and acoustic test configurations, broadband turbomachinery and hot jet engine noise simulators, and various airframe configurations which include landing gear, cruise and drooped wing leading edges, trailing edge elevons and vertical tail options. To aid in this study, two major facility upgrades have occurred. First, a propane delivery system has been installed to provide the acoustic characteristics with realistic temperature conditions for a hot gas engine; and second, a traversing microphone array and side towers have been added to gain full spectral and directivity noise characteristics.
NASA Technical Reports Server (NTRS)
Tarshish, Adina; Salmon, Ellen
1994-01-01
In October 1992, the NASA Center for Computational Sciences made its Convex-based UniTree system generally available to users. The ensuing months saw growth in every area. Within 26 months, data under UniTree control grew from nil to over 12 terabytes, nearly all of it stored on robotically mounted tape. HiPPI/UltraNet was added to enhance connectivity, and later HiPPI/TCP was added as well. Disks and robotic tape silos were added to those already under UniTree's control, and 18-track tapes were upgraded to 36-track. The primary data source for UniTree, the facility's Cray Y-MP/4-128, first doubled its processing power and then was replaced altogether by a C98/6-256 with nearly two-and-a-half times the Y-MP's combined peak gigaflops. The Convex/UniTree software was upgraded from version 1.5 to 1.7.5, and then to 1.7.6. Finally, the server itself, a Convex C3240, was upgraded to a C3830 with a second I/O bay, doubling the C3240's memory and capacity for I/O. This paper describes insights gained and reinforced with the burgeoning demands on the UniTree storage system and the significant increases in performance gained from the many upgrades.
Preliminary Study of Methods for Upgrading USGS Antarctic Seismological Capability
Holcomb, L. Gary
1982-01-01
Purpose The purpose of this study is to evaluate potential methods for obtaining higher quality seismic data from Antarctica. Currently, USGS-sponsored WWSSN stations are located at Scott Base, Sanae Base, and at South Pole Station. Scott and Sanae Stations are located near the coast; data obtained from coastal installations are normally degraded by noise generated by ocean wave action on the coast. Operations at South Pole are rather difficult because of the severe environmental characteristics and the extended logistics which are required to provide supplies and operating personnel to its remote location. Short-period data quality from Pole Station has been moderately high with a short-period magnification of 100K at 1Hz. Long-period magnifications have been rather low (<1K @ 15 s period). Recent relocation of the seismic recording facilities at South Pole Station as a result of the construction of a completely new station facility has caused serious degradation of the data quality due to faulty installation techniques. Repairs have been implemented to remedy these deficiencies and to regain the data quality which existed before the move to new facilities. However, the technology being used at South Pole Station is of WWSSN vintage; as a result it is about 20 years old. Much has been learned about achieving higher magnifications since the WWSSN was designed. This study will evaluate the feasibility of applying recent technological advances to Antarctic seismology. Seismological data from the Antarctic Continent is important to the world's seismological community because of the Antarctic's unique geographic position on the globe. Land masses are scarce in that part of the world; the Antarctic sits right in the middle of the void. Therefore, its data are important for completing the data set for the southern hemisphere. Upgrading the USGS seismic capability in the Antarctic should also prove to be a wise investment from another point of view. Although the initial costs of the Antarctic upgrade program would be high, and the cost of routine maintenance and support would be greater than in other parts of the world, the ease of upgrading is aided by the unique nonpolitical aspect of the continent. In addition, the danger of losing our investment due to political unrest or change is almost zero. In the past, political complications have severely impacted operations at several SRO stations. Therefore, an effort to improve data quality from the Antarctic would be a prudent long-term investment.
Rate Analysis of Two Photovoltaic Systems in San Diego
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doris, E.; Ong, S.; Van Geet, O.
2009-07-01
Analysts have found increasing evidence that rate structure has impacts on the economics of solar systems. This paper uses 2007 15-minute interval photovoltaic (PV) system and load data from two San Diego City water treatment facilities to illustrate impacts of different rate designs. The comparison is based on rates available in San Diego at the time of data collection and include proportionately small to large demand charges (relative to volumetric consumption), and varying on- and off- peak times. Findings are twofold for these large commercial systems: 1) transferring costs into demand charges does not result in savings and 2) changesmore » in peak times do not result in a major cost difference during the course of a year. While lessons learned and discussion on rate components are based on the findings, the applicability is limited to buildings with similar systems, environments, rate options, and loads.« less
1973-06-22
SL2-03-126 (June 1973) --- A color infrared photograph of the Los Angeles County and Kern County area, taken from the Skylab space station in Earth orbit during its first manned Skylab mission. The Mojave Desert occupies the northeast one-fourth of the photograph. Lake Isabella in the Sierra Nevada Mountains is the v-shaped body of water. The San Gabriel Mountains extend across the southern part of the picture. At lower center is the intersection of the San Andreas and Garlock faults. The San Joaquin Valley is in the center at the left edge. (The picture should be held with the heavy cloud cover at lower right corner so that north will be at top.) This picture was exposed by one of the six lenses of the Itek-furnished S190-A Multispectral Photographic Facility experiment in the Multiple Docking Adapter of the Skylab space station. Type 2443 film was used. Photo credit: NASA
Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garrison, R.C.
1995-02-01
This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of themore » Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.« less
Upgrade of the SPIRAL identification station for high-precision measurements of nuclear β decay
NASA Astrophysics Data System (ADS)
Grinyer, G. F.; Thomas, J. C.; Blank, B.; Bouzomita, H.; Austin, R. A. E.; Ball, G. C.; Bucaille, F.; Delahaye, P.; Finlay, P.; Frémont, G.; Gibelin, J.; Giovinazzo, J.; Grinyer, J.; Kurtukian-Nieto, T.; Laffoley, A. T.; Leach, K. G.; Lefèvre, A.; Legruel, F.; Lescalié, G.; Perez-Loureiro, D.
2014-03-01
The low-energy identification station at SPIRAL (Système de Production d'Ions Radioactifs Accélérés en Ligne) has been upgraded for studying the β decays of short-lived radioactive isotopes and to perform high-precision half-life and branching-ratio measurements for superallowed Fermi and isospin T=1/2 mirror β decays. These new capabilities, combined with an existing Paul trap setup for measurements of β-ν angular-correlation coefficients, provide a powerful facility for investigating fundamental properties of the electroweak interaction through nuclear β decays. A detailed description of the design study, construction, and first results obtained from an in-beam commissioning experiment on the β+ decays 14 O and 17F are presented.
Space reactor fuel element testing in upgraded TREAT
NASA Astrophysics Data System (ADS)
Todosow, M.; Bezler, P.; Ludewig, H.; Kato, W. Y.
The testing of candidate fuel elements at prototypic operating conditions with respect to temperature, power density, hydrogen coolant flow rate, etc.; a crucial component in the development and qualification of nuclear rocket engines based on the Particle Bed Reactor (PBR); NERVA-derivative; and other concepts are discussed. Such testing may be performed at existing reactors, or at new facilities. A scoping study has been performed to assess the feasibility of testing PBR based fuel elements at the TREAT reactor. Initial results suggest that full-scale PBR elements could be tested at an average energy deposition of approximately 60-80 MW-s/L in the current TREAT reactor. If the TREAT reactor was upgraded to include fuel elements with a higher temperature limit, average energy deposition of approximately 100 MW/L may be achievable.
Space reactor fuel element testing in upgraded TREAT
NASA Astrophysics Data System (ADS)
Todosow, Michael; Bezler, Paul; Ludewig, Hans; Kato, Walter Y.
1993-01-01
The testing of candidate fuel elements at prototypic operating conditions with respect to temperature, power density, hydrogen coolant flow rate, etc., is a crucial component in the development and qualification of nuclear rocket engines based on the Particle Bed Reactor (PBR), NERVA-derivative, and other concepts. Such testing may be performed at existing reactors, or at new facilities. A scoping study has been performed to assess the feasibility of testing PBR based fuel elements at the TREAT reactor. Initial results suggests that full-scale PBR elements could be tested at an average energy deposition of ˜60-80 MW-s/L in the current TREAT reactor. If the TREAT reactor was upgraded to include fuel elements with a higher temperture limit, average energy deposition of ˜100 MW/L may be achievable.
Diagnostics Upgrades for Investigations of HOM Effects in TESLA-type SCRF Cavities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lumpkin, A. H.; Edstrom Jr., D.; Ruan, J.
We describe the upgrades to diagnostic capabilities on the Fermilab Accelerator Science and Technology (FAST) electron linear accelerator that will allow investigations of the effects of high-order modes (HOMs) in SCRF cavities on macropulse-average beam quality. We examine the dipole modes in the first pass-band generally observed in the 1.6-1.9 GHz regime for TESLA-type SCRF cavities due to uniform transverse beam offsets of the electron beam. Such cavities are the basis of the accelerators such as the European XFEL and the proposed MaRIE XFEL facility. Preliminary HOM detector data, prototype BPM test data, and first framing camera OTR data withmore » ~20- micron spatial resolution at 250 pC per bunch will be presented.« less
Microprocessor tester for the treat upgrade reactor trip system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenkszus, F.R.; Bucher, R.G.
1984-01-01
The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. In addition, a programmable Automated Reactor Control System (ARCS) will permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety systemmore » is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations.« less
Advances in instrumentation at the W. M. Keck Observatory
NASA Astrophysics Data System (ADS)
Adkins, Sean M.; Armandroff, Taft E.; Johnson, James; Lewis, Hilton A.; Martin, Christopher; McLean, Ian S.; Wizinowich, Peter
2012-09-01
In this paper we describe both recently completed instrumentation projects and our current development efforts in terms of their role in the strategic plan, the key science areas they address, and their performance as measured or predicted. Projects reaching completion in 2012 include MOSFIRE, a near IR multi-object spectrograph, a laser guide star adaptive optics facility on the Keck I telescope, and an upgrade to the guide camera for the HIRES instrument on Keck I. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager (KCWI), an upgrade to the telescope control systems on both Keck telescopes, a near-IR tip/tilt sensor for the Keck I adaptive optics system, and a new grating for the OSIRIS integral field spectrograph.
1988-06-01
Given the very nature of health care facilities, there is significant variablity in patient loads and the types of disorders treated at various...two Department of Defense health care facilities in San Antonio that best compare to WHMC) reflect WHMC’s patient wait time to be quite impressive...Med Center (If applicable) U.S. ARMY-BAYLOR UNIVERSITY GRADUATE Lackland AFB, Texas I SG-3R PIOGRAM IN HEALTH CAPE ADMINISTRATION 6c. ADDRESS (City
Dependence of U. S. Defense Systems on Foreign Technologies
1990-12-01
systematic assess- ments. Projzct Socrates appeared closest to meeting this need. It had long-range goals of 14 I tracking most critical technologies and...Litton-Canada Toronto, ON Wright-Patterson AFB Dayton, OH Naval Avionics Facility Indianapolis, IN Kaiser Electronics San Jose , CA Naval Air Systems
HOW TELEVISION CAN TRAIN YOUR TEACHERS.
ERIC Educational Resources Information Center
1961
EDUCATIONAL TELEVISION MAY SOLVE THE PROBLEMS OF TEACHER INSERVICE TRAINING. IN SAN JOSE, CALIFORNIA, 21 SCHOOL DISTRICTS HAVE COOPERATED IN PRODUCING A TEACHER INSERVICE PROGRAM. THE TELEVISION CENTER OF THE STATE COLLEGE PRODUCES AND DIRECTS THE TELECASTS. A COMMERCIAL TELEVISION STATION DONATES ITS FACILITIES AND AIR TIME. A PERMANENT…
40 CFR 21.3 - Submission of applications.
Code of Federal Regulations, 2011 CFR
2011-07-01
... St., San Francisco, CA 94105 Arizona, California, Hawaii, Nevada, the territories of American Samoa... Administrator or the State Water Pollution Control Authority in which the facility is located. (c) An... description of the process or activity generating the pollution to be abated by the additions, alterations, or...
Hazardous Waste Cleanup: Pfizer Pharmaceuticals, LLC in Arecibo, Puerto Rico
Pfizer Pharmaceuticals LLC is located on the north coast of Puerto Rico, in the Sabana Hoyos Ward, which is approximately 30miles from the San Juan metropolitan area. The facility is located in an area zoned as industrial (IL-2) by the local Planning Boa
Energy and Cost Optimized Technology Options to Meet Energy Needs of Food Processors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Makhmalbaf, Atefe; Srivastava, Viraj; Hoffman, Michael G.
Full Paper Submission for: Combined cooling, heating and electric power (CCHP) distributed generation (DG) systems can provide electric power and, heating and cooling capability to commercial and industrial facilities directly onsite, while increasing energy efficiency, security of energy supply, grid independence and enhancing the environmental and economic situation for the site. Food processing industries often have simultaneous requirements for heat, steam, chilling and electricity making them well suited for the use of such systems to supply base-load or as peak reducing generators enabling reduction of overall energy use intensity. This paper documents analysis from a project evaluating opportunities enabled bymore » CCHPDG for emission and cost reductions and energy storage systems installed onsite at food processing facilities. In addition, this distributed generation coupled with energy storage demonstrates a non-wires solution to delay or eliminate the need for upgrades to electric distribution systems. It was found that a dairy processing plant in the Pacific Northwest currently purchasing 15,000 MWh/yr of electricity and 190,000 MMBtu/yr of gas could be provided with a 1.1 MW CCHP system reducing the amount of electric power purchased to 450 MWh/yr while increasing the gas demand to 255,000 MMBtu/yr. The high percentage of hydro-power in this region resulted in CO2 emissions from CCHP to be higher than that attributed to the electric utility/regional energy mix. The value of this work is in documenting a real-world example demonstrating the value of CCHP to facility owners and financial decision makers to encourage them to more seriously consider CCHP systems when building or upgrading facilities.« less
Achieving walkable city in Indonesia: Policy and responsive design through public participation
NASA Astrophysics Data System (ADS)
Tanan, Natalia; Darmoyono, Laksmi
2017-11-01
This paper discusses approaches to policy and planning of pedestrian facility that facilitate walking in cities in Indonesia. It applies quantitative and qualitative methods to analyze walkability in some cities. The new perspective in policy and planning are focusing on improving non-motorized mobility; it encourages walking and put the provision of the pedestrian facility as an integral part of built environmental planning and development. The policy perceives pedestrian facility in broad, not only about physical development, but also benefit to socioeconomic activity and environmental quality. It is expected that the implementation of policies and walkability concept could upgrade the pedestrian facility, as a walkable city delivers green atmosphere of the urban environment. A design competition of pedestrian facility was held to test the policy and accommodate input from the public. Public participation through competition also enriches the design of pedestrian facility that responsive to local condition. Implementation is still a challenge due to limited budget; however, there are tendencies that few cities improve pedestrian facilities to encourage people walking in order to make the city livable and environmentally friendly.
Terrazas, Enrique; Hamill, Timothy R.; Wang, Ye; Channing Rodgers, R. P.
2007-01-01
The Department of Laboratory Medicine at the University of California, San Francisco (UCSF) has been split into widely separated facilities, leading to much time being spent traveling between facilities for meetings. We installed an open-source AccessGrid multi-media-conferencing system using (largely) consumer-grade equipment, connecting 6 sites at 5 separate facilities. The system was accepted rapidly and enthusiastically, and was inexpensive compared to alternative approaches. Security was addressed by aspects of the AG software and by local network administrative practices. The chief obstacles to deployment arose from security restrictions imposed by multiple independent network administration regimes, requiring a drastically reduced list of network ports employed by AG components. PMID:18693930
Terrazas, Enrique; Hamill, Timothy R; Wang, Ye; Channing Rodgers, R P
2007-10-11
The Department of Laboratory Medicine at the University of California, San Francisco (UCSF) has been split into widely separated facilities, leading to much time being spent traveling between facilities for meetings. We installed an open-source AccessGrid multi-media-conferencing system using (largely) consumer-grade equipment, connecting 6 sites at 5 separate facilities. The system was accepted rapidly and enthusiastically, and was inexpensive compared to alternative approaches. Security was addressed by aspects of the AG software and by local network administrative practices. The chief obstacles to deployment arose from security restrictions imposed by multiple independent network administration regimes, requiring a drastically reduced list of network ports employed by AG components.