Periodic and quiescent solar activity effects in the low ionosphere, using SAVNET data
NASA Astrophysics Data System (ADS)
Bertoni, F. C. P.; Raulin, J.-P.; Gavilan, H. R.; Kaufmann, P.; Raymundo, T. E.
2010-10-01
Important results have been acquired using the measurements of VLF amplitude and phase signals from the South America VLF Network (SAVNET) stations. This network is an international project coordinated by CRAAM, Brazil in cooperation with Peru and Argentina. It started operating in April 2006, and now counts on eight stations (Atibaia, Palmas, Santa Maria and Estaça~o Antártica Comandante Ferraz in Brazil; Piura, Punta-Lobos and Ica, in Peru; CASLEO, in Argentina). Researches, through the last decades, have demonstrated the versatility of the VLF technique for many scientific and technological purposes. In this work, we summarize some recent results using SAVNET data base. We have obtained daily maximum diurnal amplitude time series that exhibited behavior patterns in different time scales: 1) 1ong term variations indicating the solar activity level control of the low ionosphere; 2) characteristic periods of alternated slow and fast variations, the former being related to solar illumination conditions, and the latter that have been associated with the winter anomaly at high latitudes; 3) 27-days period related to the solar rotation and consequently associated to the solar Lyman-α radiation flux variations, reinforcing earlier theories about the importance of this spectral line for the D-region formation. Finally, we conclude presenting preliminary results of simulation using LWPC, which showed very good agreement at times of observed modal amplitude minima for a given VLF propagation path.
Subionospheric VLF Propagation Modelling During a solar flares
NASA Astrophysics Data System (ADS)
Akel, A. F.
2013-05-01
This work aims to present a preliminary study of the behavior of the lower ionosphere under transient regimes of ionization through the technique of wave propagation of VLF (Very Low Frequency). For this, we characterized the lower ionosphere by two traditional (wait) parameters H' and β which are found by VLF radio modelling using the computational code of subionospheric radio propagation LWPC(Long Wave Propagation Capability). The main effects and behaviors investigated in this study was due to a solar flare 2M class near solar minimum at 03/25/2008. We changed Solar zenith angle dependence of the ionospheric parameters H' and β for diurnal time by a polynomial equation. For this study we used the available data the South America VLF Network (SAVNET) and show the results between modeling and data
Establishment of the New Ecuadorian Solar Physics Phenomena Division
NASA Astrophysics Data System (ADS)
Lopez, E. D.
2014-02-01
Crucial physical phenomena occur in the equatorial atmosphere and ionosphere, which are currently understudied and poorly understood. Thus, scientific campaigns for monitoring the equatorial region are required in order to provide the necessary data for the physical models. Ecuador is located in strategic geographical position where these studies can be performed, providing quality data for the scientific community working in understanding the nature of these physical systems. The Quito Astronomical Observatory of National Polytechnic School is moving in this direction by promoting research in space sciences for the study of the equatorial zone. With the participation and the valuable collaboration of international initiatives such us AWESOME, MAGDAS, SAVNET and CALLISTO, the Quito Observatory is establishing a new space physics division on the basis of the International Space Weather Initiative. In this contribution, the above initiative is presented by inviting leaders of other scientific projects to deploy its instruments and to work with us providing the necessary support to the creation of this new strategic research center
Jones, P H; Dawson, S; Gaskell, R M; Coyne, K P; Tierney, A; Setzkorn, C; Radford, A D; Noble, P-J M
2014-09-01
Using the Small Animal Veterinary Surveillance Network (SAVSNET), a national small animal disease-surveillance scheme, information on gastrointestinal disease was collected for a total of 76 days between 10 May 2010 and 8 August 2011 from 16,223 consultations (including data from 9115 individual dogs and 3462 individual cats) from 42 premises belonging to 19 UK veterinary practices. During that period, 7% of dogs and 3% of cats presented with diarrhoea. Adult dogs had a higher proportional morbidity of diarrhoea (PMD) than adult cats (P <0.001). This difference was not observed in animals <1 year old. Younger animals in both species had higher PMDs than adult animals (P < 0.001). Neutering was associated with reduced PMD in young male dogs. In adult dogs, miniature Schnauzers had the highest PMD. Most animals with diarrhoea (51%) presented having been ill for 2-4 days, but a history of vomiting or haemorrhagic diarrhoea was associated with a shorter time to presentation. The most common treatments employed were dietary modification (66% of dogs; 63% of cats) and antibacterials (63% of dogs; 49% of cats). There was variability in PMD between different practices. The SAVNET methodology facilitates rapid collection of cross-sectional data regarding diarrhoea, a recognised sentinel for infectious disease, and characterises data that could benchmark clinical practice and support the development of evidence-based medicine. Copyright © 2014 Elsevier Ltd. All rights reserved.
New Ecuadorian VLF and ELF receiver for study the ionosphere
NASA Astrophysics Data System (ADS)
Lopez, Ericson; Montenegro, Jefferson; Vasconez, Michael; Vicente, Klever
Crucial physical phenomena occur in the equatorial atmosphere and ionosphere, which are currently understudied and poorly understood. Thus, scientific campaigns for monitoring the equatorial region are required in order to provide the necessary data for the physical models. Ecuador is located in strategic geographical position where these studies can be performed, providing quality data for the scientific community working in understanding the nature of these physical systems. The Quito Astronomical Observatory (QAO) of National Polytechnic School is moving in this direction by promoting research in space sciences for the study of the equatorial zone. With the participation and the valuable collaboration of international initiatives such us AWESOME, MAGDAS, SAVNET and CALLISTO, the Quito Observatory is establishing a new space physics division on the basis of the International Space Weather Initiative. As part of this project, in the QAO has been designed a new system for acquisition and processing VLF and ELF signals propagating in the ionosphere. The Labview Software is used to filtering, processing and conditioning the received signals, avoiding in this way 60 percent of the analog components present in a common receiver. The same software have been programmed to create the spectrograms and the amplitude and phase diagrams of the radio signals. The data is stored neatly in files that can be processed even with other applications.
24 CFR 3286.413 - Recordkeeping.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Recordkeeping. 3286.413 Section 3286.413 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD...
24 CFR 3286.411 - Certifying installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in...; or (ii) An installation design and instructions that have been prepared and certified by a...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3286.111 - Installer certification of installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD...; or (ii) An installation design and instructions that have been prepared and certified by a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, William Eugene
These slides describe different strategies for installing Python software. Although I am a big fan of Python software development, robust strategies for software installation remains a challenge. This talk describes several different installation scenarios. The Good: the user has administrative privileges - Installing on Windows with an installer executable, Installing with Linux application utility, Installing a Python package from the PyPI repository, and Installing a Python package from source. The Bad: the user does not have administrative privileges - Using a virtual environment to isolate package installations, and Using an installer executable on Windows with a virtual environment. The Ugly:more » the user needs to install an extension package from source - Installing a Python extension package from source, and PyCoinInstall - Managing builds for Python extension packages. The last item referring to PyCoinInstall describes a utility being developed for the COIN-OR software, which is used within the operations research community. COIN-OR includes a variety of Python and C++ software packages, and this script uses a simple plug-in system to support the management of package builds and installation.« less
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3286.107 - Installation in accordance with standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... requirements. (1) For purposes of determining installer compliance, a manufactured home that is subject to the requirements of this subpart B must be installed in accordance with: (i) An installation design and...
24 CFR 3286.413 - Recordkeeping.
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements of this part; and (6) A copy of foundation designs used to install the home, if different from the... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD... the installation work and the address of the home installed; (2) A copy of the contract pursuant to...
24 CFR 3286.405 - Installation suitability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in... installing a manufactured home at any site, the installer must assure that the site is suitable for...
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
NASA Technical Reports Server (NTRS)
Cook, M.
1989-01-01
The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2011 CFR
2011-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...
Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naim
2016-09-01
Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study themore » relationship between market dynamics and pricing with more precision.« less
24 CFR 3285.906 - Telephone and cable TV.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.906 Telephone and cable TV. It is recommended that the installation instructions explain that telephone and cable TV wiring should be installed in accordance with requirements of...
Evaluation of Installation Time for SMASHmount by SMASHsolar
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewablemore » Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.« less
Development and Installation of a Continuous Water Monitoring Systems for the AEDC
1992-08-01
AEDC-TR-92-8 Development and Installation of Continuous Water Monitoring Systems for the AEDC ES Industries 701 South Route 73 Berlin, NJ 08009...Development and Installation of a Continuous Water Monitoring System for the AEDC E AUTHOR(S) Przybyciel, M., Behm, J., and Sampey, T. 7. PERFORMING...Maximum 200 words) A system to sample and analyze water from Rowland Creek at AEDC for hydrocarbon contaminants has been developed under a Small
Assembly and installation of the Belle II TOP detector
NASA Astrophysics Data System (ADS)
Suzuki, Kazuhito; Belle II TOP Group
2017-12-01
The Time-of-Propagation (TOP) detector is a new type of ring-imaging Cherenkov detector developed for particle identification in the barrel region of the Belle II spectrometer. In the assembly and installation, it is crucial for the detector performance to achieve precision alignment and secure gluing of the optical components as well as to mechanically support them managing the stress, attitude, optical and electrical contacts, and limited installation space. Various efforts were made to develop the procedures and jigs along with the development of the mechanical structure. Such efforts accomplished the assembly and installation in April and May 2016, respectively, without a significant incident.
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1979-01-01
The design and development of marketable solar heating and cooling systems for single family and commercial applications is described. The delivery, installation, and monitoring of the prototype systems are discussed. Seven operational test sites are discussed in terms of system performance. Problems encountered with equipment and installation were usually due to lack of skills required for solar system installation.
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3286.103 - DAPIA-approved installation instructions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... instructions for the home. (2) If the installation requires a design that is different from that provided by... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... purchaser or lessee. (1) For each manufactured home sold or leased to a purchaser or lessee, the retailer...
Software Management Environment (SME) installation guide
NASA Technical Reports Server (NTRS)
Kistler, David; Jeletic, Kellyann
1992-01-01
This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.
24 CFR 3286.308 - Training curriculum.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Training curriculum. 3286.308 Section 3286.308 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Training of Installers in HUD-Administered...
24 CFR 3286.308 - Training curriculum.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Training curriculum. 3286.308 Section 3286.308 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Training of Installers in HUD-Administered...
Automated installation methods for photovoltaic arrays
NASA Astrophysics Data System (ADS)
Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.
1982-11-01
Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.
Performance of buried pipe installation.
DOT National Transportation Integrated Search
2010-05-01
The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...
Design and installation package for a solar powered pump
NASA Technical Reports Server (NTRS)
1978-01-01
The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.
NASA Technical Reports Server (NTRS)
Miley, S. J.; Cross, E. J., Jr.; Owens, J. K.; Lawrence, D. L.
1981-01-01
A flight-test based research program was performed to investigate the aerodynamics and cooling of a horizontally-opposed engine installation. Specific areas investigated were the internal aerodynamics and cooling mechanics of the installation, inlet aerodynamics, and exit aerodynamics. The applicable theory and current state of the art are discussed for each area. Flight-test and ground-test techniques for the development of the cooling installation and the solution of cooling problems are presented. The results show that much of the internal aerodynamics and cooling technology developed for radial engines are applicable to horizontally opposed engines. Correlation is established between engine manufacturer's cooling design data and flight measurements of the particular installation. Also, a flight-test method for the development of cooling requirements in terms of easily measurable parameters is presented. The impact of inlet and exit design on cooling and cooling drag is shown to be of major significance.
Performance evaluation of buried pipe installation.
DOT National Transportation Integrated Search
2010-05-01
The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...
Blind-Anchor-Nut-Installation Fixture (BANIF)
NASA Technical Reports Server (NTRS)
Willey, Norman F., Jr.; Linker, James F.
1994-01-01
Blind-anchor-nut-installation fixture, BANIF, developed for replacing or installing anchor nuts in blind holes or other inaccessible places. Attachment of anchor nut to BANIF enables placement of anchor nut on blind side of component.
A framework for sea level rise vulnerability assessment for southwest U.S. military installations
Chadwick, B.; Flick, Reinhard; Helly, J.; Nishikawa, Tracy; Pei, Fang Wang; O'Reilly, W.; Guza, R.; Bromirski, Peter; Young, A.; Crampton, W.; Wild, B.; Canner, I.
2011-01-01
We describe an analysis framework to determine military installation vulnerabilities under increases in local mean sea level as projected over the next century. The effort is in response to an increasing recognition of potential climate change ramifications for national security and recommendations that DoD conduct assessments of the impact on U.S. military installations of climate change. Results of the effort described here focus on development of a conceptual framework for sea level rise vulnerability assessment at coastal military installations in the southwest U.S. We introduce the vulnerability assessment in the context of a risk assessment paradigm that incorporates sources in the form of future sea level conditions, pathways of impact including inundation, flooding, erosion and intrusion, and a range of military installation specific receptors such as critical infrastructure and training areas. A unique aspect of the methodology is the capability to develop wave climate projections from GCM outputs and transform these to future wave conditions at specific coastal sites. Future sea level scenarios are considered in the context of installation sensitivity curves which reveal response thresholds specific to each installation, pathway and receptor. In the end, our goal is to provide a military-relevant framework for assessment of accelerated SLR vulnerability, and develop the best scientifically-based scenarios of waves, tides and storms and their implications for DoD installations in the southwestern U.S.
Final Report- Local Energy Matters: Solar Development in Duluth, Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Slick, Jodi Lyn
The Local Energy Matters project advanced solar deployment in the City of Duluth, MN- a cold-climate community of 86,000. At the beginning of the project, Duluth had 254.57 kW installed solar capacity with an average cost of 5.04 USD/watt installed in 2014. The project worked with cross-sector stakeholders to benchmark the current market, implement best practices for solar deployment and soft cost reduction, develop pilot deployment programs in residential rooftop, community solar, and commercial/industrial sectors, work with the City of Duluth to determine appropriate sites for utility scale developments, and demonstrate solar pus storage. Over the three years of themore » project, Duluth’s installed residential and commercial solar capacity grew by 344% to 875.9 kW with an additional 702 kW solar garden capacity subscribed by Duluth residents, businesses, and institutions. Installation costs dropped 48% over this timeframe to 4.08 USD/watt installed (exclusive of solar garden construction). This report documents the process used to identify levers for increased solar installation and cost reductions in a nascent cold-climate solar market.« less
Installation package for a solar heating and hot water system
NASA Technical Reports Server (NTRS)
1978-01-01
Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.
Offshore wind development research (technical brief).
DOT National Transportation Integrated Search
2014-04-01
The study addresses all aspects of Offshore Wind (OSW) development. This includes identifying : vessel types, vessel installation methods, needs and operating characteristics through all phases : of OSW installation, construction, operations and main...
Development of guidelines for the installation of marked crosswalks.
DOT National Transportation Integrated Search
2004-01-01
The Manual on Uniform Traffic Control Devices (MUTCD) provides little guidance on the installation of marked crosswalks, especially at locations other than intersections, i.e., mid-block locations. Crosswalks have typically been installed and designe...
Transport and installation of the Dark Energy Survey CCD imager
NASA Astrophysics Data System (ADS)
Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken
2012-09-01
The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.
Evaluation of Cable Harness Post-Installation Testing. Part B
NASA Technical Reports Server (NTRS)
King, M. S.; Iannello, C. J.
2011-01-01
The Cable Harness Post-Installation Testing Report was written in response to an action issued by the Ares Project Control Board (PCB). The action for the Ares I Avionics & Software Chief Engineer and the Avionics Integration and Vehicle Systems Test Work Breakdown Structure (WBS) Manager in the Vehicle Integration Office was to develop a set of guidelines for electrical cable harnesses. Research showed that post-installation tests have been done since the Apollo era. For Ares I-X, the requirement for post-installation testing was removed to make it consistent with the avionics processes used on the Atlas V expendable launch vehicle. Further research for the report involved surveying government and private sector launch vehicle developers, military and commercial aircraft, spacecraft developers, and harness vendors. Responses indicated crewed launch vehicles and military aircraft perform post-installation tests. Key findings in the report were as follows: Test requirements identify damage, human-rated vehicles should be tested despite the identification of statistically few failures, data does not support the claim that post-installation testing damages the harness insulation system, and proper planning can reduce overhead associated with testing. The primary recommendation of the report is for the Ares projects to retain the practice of post-fabrication and post-installation cable harness testing.
24 CFR 3286.511 - Inspector qualifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered... a manufactured home that is subject to the requirements of the HUD-administered installation program: (1) A manufactured home or residential building inspector employed by the local authority having...
1979-02-01
A 0 ’A099 7 1 3 tAU N A E R O S P A C E C O R P B E T H P A G E N Y F / 6 ~ ~ i DEVELOPMENT OF ENVIRONMENTAL. PROFILES FOR TESTING EQUIPMENT...IHIlia- ’ -Q IIIII.L25 MICROCOPY RESOLUTION’ TEST CHART C RMS-9-R-1 DEVELOPMENT OF ENVIRONMENTAL PROFILES FOR TESTING EQUIPMENT INSTALLED IN NAVAL... Development of Environmental Profiles for Testing ,’~ Final j quipment Installed in Naval Aircraft (Fixed Wing), e 7- e* 8 S. PERFORMING ORGANIZATION
Installation package for a sunspot cascade solar water heating system
NASA Technical Reports Server (NTRS)
1980-01-01
Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.
24 CFR 3286.5 - Overview of installation program.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doyle, C.; Truitt, A.; Inda, D.
The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligencemore » activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.« less
Renewable Energy Opportunities at the Kanto Installations, Japan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.
2010-09-24
This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energymore » Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.« less
NASA Astrophysics Data System (ADS)
Vest, K. F.; Jones, P.; French, D.; Sachs, H.; Clements, F.
1985-11-01
This report discusses the design of a two-node, color Video-Teleconferencing System for the System for the U.S. Navy and its installation at sites in Suitland, Maryland, and Pearl Harbor. It details the development of the audio, video, and fast-facsimile parts of the system; integration of the system into the communications network; design of a teleconference room; and installation of the system.
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru
This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.
Physical installation of Pelletron and electron cooling system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hurh, P.
1997-09-01
Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure areamore » and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here.« less
Digital control for the condensate system in a combined cycle power plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanchez Parra, M.; Fuentes Gutierrez, J.E.; Castelo Cuevas, L.
1994-12-31
This paper presents the highlights by means of which development, installation and start up of the digital control system (DCS)for the condenser and hotwell (condensate system) were performed. This system belongs to the distributed control system installed by the Instituto de Investigaciones Electricas (IIE) at the Combined Cycle Power Plant in Gomez Palacio (GP), Durango, Mexico, during the February-March period, in 1993. The main steps for development of the condenser and hotwell control system include: process modeling, definition of control strategies, algorithms, design and software development, PC simulation tests, laboratory tests with an equipment similar to the one installed atmore » the GP Power Plant, installation, and finally, start up, which was a joint effort with the GP Power Plant engineering staff.« less
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2010 CFR
2010-04-01
... with respect to home design and construction; (b) Consideration of site-specific conditions; (c) Site... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home...
Pilot installation of a bridge scour monitoring site at FM 1157 Mustang Creek
DOT National Transportation Integrated Search
1999-12-01
A pilot installation was implemented at the Mustang Creek bridge crossing on FM 1157 in the Yoakum District, Jackson County, Texas. This pilot installation was developed in two phases. Phase 1 used a rather limited datalogger that lacked the ability ...
Prototype road weather performance management (RWPM) tool installation instructions & user manual.
DOT National Transportation Integrated Search
2016-07-20
This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...
Prototype road weather performance management tool : installation instructions & user manual.
DOT National Transportation Integrated Search
2016-07-20
This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...
Renewable energy water supply - Mexico program summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Foster, R.
1997-12-01
This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importancemore » of training. It also presents much collected data as to the characteristics and performance of the installed systems.« less
NASA Technical Reports Server (NTRS)
Hein, G. F.
1982-01-01
The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.
32 CFR 50.5 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... personal commercial solicitation on DoD installations consistent with the policy set forth in this part. (2) Maintain and make available to installation commanders and appropriate Federal personnel the current master... installation. (3) Develop and maintain a list of all State Insurance Commissioners' points of contact for DoD...
76 FR 33161 - Installation and Use of Engine Cut-off Switches on Recreational Vessels
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
...-off switches as a standard safety feature on propulsion machinery and/or starting controls installed... not most, propulsion machinery and/or starting controls installed on recreational vessels are... new subpart N that would cover propulsion machinery capable of developing static thrust of 115 pounds...
System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.
NASA Technical Reports Server (NTRS)
1979-01-01
A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.
Solar Energy Development on DoD Installations in the Mojave & Colorado Deserts
2011-11-30
roof mount • Acreage: – ~6.2 million acres on 9 installations – 250,000 acres with some level of suitability for solar – 120,000 acres are estimated...technologies: thin - film and crystalline PV x fixed and single-axis tracking; trough; dish/Stirling engine. • 2 ownership structures (MILCON and 3rd party...1icfi.com | Solar Energy Development on DoD Installations in the Mojave & Colorado Deserts Bob Kwartin ICF International November 30, 2011 Report
Environmental Assessment of Installation Development at MacDill Air Force Base, Florida
2007-01-01
effect. The essence of the Proposed Action is installation development, which includes demolition, renovation, repair, and new construction. This IDEA...Protection Attn: Jasmine Ruffington 3900 Commonwealth Blvd., MS 47 Tallahassee, FL 32399-3000 Florida State Clearinghouse Department of
DOT National Transportation Integrated Search
2001-06-01
Some advanced air bag technologies are currently being installed in vehicles and others are still being developed. The principal advanced technology that is currently being installed in some vehicles is air bags that can inflate with lower or higher ...
Army Net Zero Prove Out. Integrated Net Zero Best Practices
2014-11-18
leveraged to increase awareness. Public Service Announcements developed by the Army or other installations can be leveraged. Signage for...approaches can be leveraged to increase awareness. Public Service Announcements developed by the Army or other installations can be leveraged. Signage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, Ryan; Dong, Changgui
Business process or “soft” costs account for well over 50% of the installed price of residential photovoltaic (PV) systems in the United States, so understanding these costs is crucial for identifying PV cost-reduction opportunities. Among these costs are those imposed by city-level permitting processes, which may add both expense and time to the PV development process. Building on previous research, this study evaluates the effect of city-level permitting processes on the installed price of residential PV systems and on the time required to develop and install those systems. The study uses a unique dataset from the U.S. Department of Energy’smore » Rooftop Solar Challenge Program, which includes city-level permitting process “scores,” plus data from the California Solar Initiative and the U.S. Census. Econometric methods are used to quantify the price and development-time effects of city-level permitting processes on more than 3,000 PV installations across 44 California cities in 2011. Results indicate that city-level permitting processes have a substantial and statistically significant effect on average installation prices and project development times. The results suggest that cities with the most favorable (i.e., highest-scoring) permitting practices can reduce average residential PV prices by $0.27–$0.77/W (4%–12% of median PV prices in California) compared with cities with the most onerous (i.e., lowest-scoring) permitting practices, depending on the regression model used. Though the empirical models for development times are less robust, results suggest that the most streamlined permitting practices may shorten development times by around 24 days on average (25% of the median development time). These findings illustrate the potential price and development-time benefits of streamlining local permitting procedures for PV systems.« less
Strain gage installation and survivability on geosynthetics used in flexible pavements
NASA Astrophysics Data System (ADS)
Brooks, Jeremy A.
The use of foil type strain gages on geosynthetics is poorly documented. In addition, very few individuals are versed in proper installation techniques or calibration methods. Due to the limited number of knowledgeable technicians there is no information regarding the susceptibility of theses gages to errors in installation by inexperienced installers. Also lacking in the documentation related to the use of foil type strain gages on geosynthetics is the survivability of the gages in field conditions. This research documented procedures for installation, calibration, and survivability used by the project team to instruments a full scale field installation in Marked Tree, AR. This research also addressed sensitivity to installation errors on both geotextile and geogrid. To document the process of gage installation an experienced technician, Mr. Joe Ables, formerly of the UASCE Waterways Experiment Station, was consulted. His techniques were combined with those discovered in related literature and those developed by the research team to develop processes that were adaptable to multiple gage geometries and parent geosynthetics. These processes were described and documented in a step by step manner with accompanying photographs, which should allow virtually anyone with basic electronics knowledge to install these gages properly. Calibration of the various geosynthetic / strain gage combinations was completed using wide width tensile testing on multiple samples of each material. The tensile testing process was documented and analyzed using digital photography to analyze strain on the strain gage itself. Calibration factors for each geosynthtics used in the full scale field testing were developed. In addition, the process was thoroughly documented to allow future researchers to calibrate additional strain gage and geosynthetic combinations. The sensitivity of the strain gages to installation errors was analyzed using wide width tensile testing and digital photography to determine the variability of the data collected from gages with noticeable installation errors as compared to properly installed gages. Induced errors varied based on the parent geosynthetics material, but included excessive and minimal waterproofing, gage rotation, gage shift, excessive and minimal adhesive, and excessive and minimal adhesive impregnation loads. The results of this work indicated that minor errors in geotextile gage installation that are noticeable and preventable by the experienced installer have no statistical significance on the data recorded during the life span of geotextile gages; however the lifespan of the gage may be noticeably shortened by such errors. Geogrid gage installation errors were found to cause statistically significant changes in the data recorded from improper installations. The issue of gage survivability was analyzed using small scale test sections instrumented and loaded similarly to field conditions anticipated during traditional roadway construction. Five methods of protection were tested for both geotextile and geogrid including a sand blanket, inversion, semi-hemispherical PCV sections, neoprene mats, and geosynthetic wick drain. Based on this testing neoprene mats were selected to protect geotextile installed gages, and wick drains were selected to protect geogrid installed gages. These methods resulted in survivability rates of 73% and 100% in the full scale installation respectively. This research and documentation may be used to train technicians to install and calibrate geosynthetic mounted foil type strain gages. In addition, technicians should be able to install gages in the field with a high probability of gage survivability using the protection methods recommended.
Investigation on installation of offshore wind turbines
NASA Astrophysics Data System (ADS)
Wang, Wei; Bai, Yong
2010-06-01
Wind power has made rapid progress and should gain significance as an energy resource, given growing interest in renewable energy and clean energy. Offshore wind energy resources have attracted significant attention, as, compared with land-based wind energy resources, offshore wind energy resources are more promising candidates for development. Sea winds are generally stronger and more reliable and with improvements in technology, the sea has become a hot spot for new designs and installation methods for wind turbines. In the present paper, based on experience building offshore wind farms, recommended foundation styles have been examined. Furthermore, wave effects have been investigated. The split installation and overall installation have been illustrated. Methods appropriate when installing a small number of turbines as well as those useful when installing large numbers of turbines were analyzed. This investigation of installation methods for wind turbines should provide practical technical guidance for their installation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-04-01
The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low pricesmore » are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.« less
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
24 CFR 3285.902 - Moving manufactured home to location.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.902 Moving manufactured home to location. It is recommended...
2007-01-01
software applications and rely on the installations to supply them with the basic I&E geospatial data - sets for those applications. Such...spatial data in geospatially based tools to help track military supplies and materials all over the world. For instance, SDDCTEA developed IRRIS, a...regional offices or individual installations to supply the data and perform QA/QC in the process. The IVT program office worked with the installations and
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2013 CFR
2013-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... development and publication of installation traffic codes will be based on the following: (1) Highway Safety...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2012 CFR
2012-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... code of the State or host nation in which the installation is located. In addition, the development and...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... code of the State or host nation in which the installation is located. In addition, the development and...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2014 CFR
2014-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... code of the State or host nation in which the installation is located. In addition, the development and...
32 CFR 634.25 - Installation traffic codes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... riding in a POV whether on or off the installation. (iv) Infant/child restraint devices (car seats) will be required in POVs for children 4 years old or under and not exceeding 45 pounds in weight. (v... development and publication of installation traffic codes will be based on the following: (1) Highway Safety...
Carter, D A; Hirst, I L
2000-01-07
This paper considers the application of one of the weighted risk indicators used by the Major Hazards Assessment Unit (MHAU) of the Health and Safety Executive (HSE) in formulating advice to local planning authorities on the siting of new major accident hazard installations. In such cases the primary consideration is to ensure that the proposed installation would not be incompatible with existing developments in the vicinity, as identified by the categorisation of the existing developments and the estimation of individual risk values at those developments. In addition a simple methodology, described here, based on MHAU's "Risk Integral" and a single "worst case" even analysis, is used to enable the societal risk aspects of the hazardous installation to be considered at an early stage of the proposal, and to determine the degree of analysis that will be necessary to enable HSE to give appropriate advice.
2012-11-01
Research , Development, Test , and Evaluation (RDT&E) Appropriations The RDT&E appropriation consists of the mission program budgets for all... research , development, test and evaluation work performed by contractors and government installations and includes an installations and activities budget...than $4,000,000. 9 f. Research , Development, Test , and Evaluation Appropriations The Research , Development, Test , and Evaluation (RDT&E
Update on Geothermal Direct-Use Installations in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckers, Koenraad J; Young, Katherine R; Snyder, Diana M.
Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others;more » power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.« less
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.104 - Moving manufactured home to location.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Moving manufactured home to... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.104 Moving manufactured home to location. Refer to § 3285.902 for considerations related to...
24 CFR 3285.101 - Fire separation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Fire separation. 3285.101 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.101 Fire separation. Fire separation distances must be in accordance with the requirements of Chapter 6 of NFPA 501A...
Learning to build large structures in space
NASA Technical Reports Server (NTRS)
Hagler, T.; Patterson, H. G.; Nathan, C. A.
1977-01-01
The paper examines some of the key technologies and forms of construction know-how that will have to be developed and tested for eventual application to building large structures in space. Construction of a shuttle-tended space construction/demonstration platform would comprehensively demonstrate large structure technology, develop construction capability, and furnish a construction platform for a variety of operational large structures. Completion of this platform would lead to demonstrations of the Satellite Power System (SPS) concept, including microwave transmission, fabrication of 20-m-deep beams, conductor installation, rotary joint installation, and solar blanket installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... planning, design, development, installation or enhancement of a computerized support enforcement system as... APD approved by the Office; and (6) The State or local government has ownership rights in software, software modifications and associated documentation that is designed, developed, installed, or enhanced...
24 CFR 3285.204 - Ground moisture control.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Ground moisture control. 3285.204... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Site Preparation § 3285.204 Ground... materials, a vapor retarder must be installed to cover the ground under the home, unless the home is...
24 CFR 3285.204 - Ground moisture control.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Ground moisture control. 3285.204... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Site Preparation § 3285.204 Ground... materials, a vapor retarder must be installed to cover the ground under the home, unless the home is...
Some Problems Involved in the Installation of Advanced Information Systems in Developing Countries.
ERIC Educational Resources Information Center
Robredo, Jaime; And Others
For over 30 years the installation of information systems has been promoted in developing nations by international organizations and international consultancies in order to transfer technical expertise from the industrialized countries to the Third World. While some have questioned the value of indiscriminately transferring scientific and…
Smart home in a box: usability study for a large scale self-installation of smart home technologies.
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen
2016-07-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.
Smart home in a box: usability study for a large scale self-installation of smart home technologies
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S.; Schmitter-Edgecombe, Maureen
2017-01-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server. PMID:28936390
Case report: silicatosis in a carpet installer.
Szeinuk, Jaime; Wilk-Rivard, Elizabeth J
2007-06-01
Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung.
24 CFR 3285.701 - Electrical crossovers.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.701 Electrical crossovers. Multi-section homes with electrical wiring in more than one section require... installation instructions. ...
Residential Central Air Conditioning and Heat Pump Installation – Workshop Outcomes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goetzler, William; Zogg, Robert; Young, Jim
DOE's Building Technologies Office works with researchers and industry partners to develop and deploy technologies that can substantially reduce energy consumption in residential and commercial buildings. This report aims to advance BTO’s energy savings, emissions reduction, and other program goals by identifying research and development (R&D), demonstration and deployment, and other non-regulatory initiatives for improving the design and installation of residential central air conditioners (CAC) and central heat pumps (CHP). Improving the adoption of CAC/CHP design and installation best practices has significant potential to reduce equipment costs, improve indoor air quality and comfort, improve system performance, and most importantly, reducemore » household energy consumption and costs for heating and cooling by addressing a variety of common installation issues.« less
NASA Astrophysics Data System (ADS)
Kim, Hee-Joung
2002-05-01
PACS industry in Korea has been rapidly growing, since government had supported collaborative PACS project between industry and university hospital. In the beginning, PACS industry had focused on developing peripheral PACS solutions, while the Korea PACS society was being formed. A few companies had started developing and installing domestic large-scale full-PACS system for teaching hospitals. Several years later, many hospitals have installed full-PACS system with national policy of reimbursement for PACS exams in November 1999. Both experiences of full-PACS installation and national policy generated tremendous intellectual and technological expertise about PACS at all levels, clinical, hospital management, education, and industrial sectors. There are now more than 20 domestic PACS companies. They have enough experiences which are capable of installing a truly full-PACS system for large-scale teaching hospitals. As an example, a domestic company had installed more than 40 full-PACS systems within 2-3 years. Enough experiences of full-PACS installation in Korea lead PACS industry to start exporting their full-PACS solutions. However, further understanding and timely implementation of continuously evolving international standard and integrated healthcare enterprise concepts may be necessary for international leading of PACS technologies for the future.
An Evaluation of Installation Methods for STS-1 Seismometers
Holcomb, L. Gary; Hutt, Charles R.
1992-01-01
INTRODUCTION This report documents the results of a series of experiments conducted by the authors at the Albuquerque Seismological Laboratory (ASl) during the spring and summer of 1991; the object of these experiments was to obtain and document quantitative performance comparisons of three methods of installing STS-1 seismometers. Historically, ASL has installed STS-1 sensors by cementing their thick glass base plates to the concrete floor of the vault (see Peterson and Tilgner, 1985, p 44 and Figure 31, p 51 for the details of this installation technique). This installation technique proved to be fairly satisfactory for the China Digital Seismic Network and for several sets of STS-1 sensors installed in other locations since that time. However, the cementing operation is rather labor intensive and the concrete requires a lengthy (about 1 week) curing time during which the sensor installed on it is noisy. In addition it is difficult to assure that all air bubbles have been removed from the interface between the cement and the glass base plate. If air bubbles are present beneath the plate, horizontal sensors can be unacceptably noisy. Moving a sensor installed in this manner requires the purchase of a new glass base plate because the old plate normally can not be removed without breakage. Therefore, this study was undertaken with the aim of developing an improved method of installing STS-1's. The goals were to develop a method which requires less field site labor during the installation and assures a higher quality installation when finished. In addition, the improved installation technique should promote portability. Two alternate installation techniques were evaluated in this study. One method replaces the cement between the base plate and the vault floor with sand. This method has been used in the French Geoscope program and in several IRIS/IDA installations made by the University of California at San Diego (UCSD) and possibly others. It is easily implemented in the field and is quite cheap. The other method utilizes a so called warpless housing designed by E. Wielandt and implemented at ASL. This housing is quite similar to the case design of the STS-2 sensor system. It is designed to minimize the effects of atmospheric pressure variations on the sealed housing.
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
Developing a Procedures Manual for Using the Innovacq 100 System Effectively and Efficiently.
ERIC Educational Resources Information Center
Cubberley, Carol
The installation of an automated acquisitions system, the Innovacq 100, demanded a review and revision of procedures in the Acquisitions Department of the University of Central Florida Library. This practicum report describes the process involved in developing the new procedures. Prior to installation, the old departmental procedures manual and…
ERIC Educational Resources Information Center
Bureau of Occupational and Adult Education (DHEW/OE), Washington, DC.
These individualized, self-paced student texts and workbooks for a secondary-postsecondary-level course in telephone equipment installation and repair is one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose stated for the course is to…
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Severe wind zones. 3285.405 Section... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developermore » receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.« less
NASA Technical Reports Server (NTRS)
Cornelius, Michael; Smartt, Ziba; Henrie, Vaughn; Johnson, Mont
2003-01-01
The recent developments in Fabry-Perot fiber optic instruments have resulted in accurate transducers with some of the physical characteristics required for use in obtaining internal data from solid rocket motors. These characteristics include small size, non-electrical excitation, and immunity to electro-magnetic interference. These transducers have not been previously utilized in this environment due to the high temperatures typically encountered. A series of tests were conducted using a 1 1-Inch Hybrid test bed to develop installation techniques that will allow the fiber optic instruments to survive and obtain data for a short period of time following the motor ignition. The installation methods developed during this test series have the potential to allow data to be acquired in the motor chamber, propellant bore, and nozzle during the ignition transient. These measurements would prove to be very useful in the characterization of current motor designs and provide insight into the requirements for further refinements. The process of developing these protective methods and the installation techniques used to apply them is summarized.
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David J.; Margolis, Robert M.
NREL has been modeling U.S. photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. solar PV for residential, commercial, and utility-scale systems built in the first quarter of 2017 (Q1 2017). Costs are represented from the perspective of the developer/installer, thus all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark this year (2017) also represents the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, along with the profit the installer/developermore » receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which are common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wissemann, Chris; White, Stanley M
The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical programmore » to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.« less
Integrated residential photovoltaic array development
NASA Technical Reports Server (NTRS)
Shepard, N. F., Jr.
1981-01-01
Three basic module design concepts were analyzed with respect to both production and installation costs. The results of this evaluation were used to synthesize a fourth design which incorporates the best features of these initial concepts to produce a module/array design approach which offers the promise of a substantial reduction in the installed cost of a residential array. A unique waterproofing and mounting scheme was used to reduce the cost of installing an integral array while still maintaining a high probability that the installed array will be watertight for the design lifetime of the system. This recommended concept will also permit the array to be mounted as a direct or stand-off installation with no changes to the module design.
NASA Astrophysics Data System (ADS)
Li, Nana; Xie, Guohui
2018-06-01
Abstract—Global renewable energy have maintained a steady growth in recent years under the support of national policies and energy demand. Resource distribution, land supply, economy, voltage class and other relevant conditions affect the renewable energy distribution and development mode. Therefore, is necessary to analyze the spatial-temporal distribution and development modes for renewable energy, so as to provide reference and guidance for the renewable energy development around world. Firstly, the definitions and influence factors the renewable energy development mode are compared and summarized. Secondly, the renewable energy spatial-temporal distribution in Germany and Denmark are provided. Wind and solar power installations account for the largest proportion of all renewable energy in Germany and Denmark. Finally, renewable energy development modes are studied. The distributed photovoltaic generation accounts for more than 95%, and distributed wind power generation installations account for over 85% in Germany. Solar and wind resources are developed with distributed development mode, in which distributed wind power installation accounts for over 75%.
Environmental Assessment of Installation Development at Joint Base San Antonio-Lackland, Texas
2013-02-01
habitat for terrestrial and avian species by creating a more natural habitat. Long-term, negligible to minor, adverse effects on fish species associated...cumulative effects on the natural and man-made environment of the other currently identified projects from the installation development and resource...adverse effect . And, for Project C6, the developed measures are to prior to construction provide elevation drawings or renderings of the building
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baldock, Nick; Sevilla, Fernando; Redfern, Robin
The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 ismore » to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model and probe the economic merits and sensitivities of various approaches to construction and O&M practices, using illustrative offshore projects across a wide range of alternative offshore development areas located in U.S. waters. The intention is to assist decision-makers in clearly understanding the relative economic benefits of both conventional and novel construction installation methodologies and maintenance techniques within the critical parameters of a Project’s LCoE.« less
Integrated Baseline System (IBS). Version 1.03, System Management Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, J.R.; Bailey, S.; Bower, J.C.
This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide alsomore » includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.« less
Code of Federal Regulations, 2014 CFR
2014-01-01
..., Specifications, Contract Documents and Other Documentation Part D—Inspection of Development Work Part A..., installation, device, arrangement, or method of work is at least equivalent to that prescribed in this exhibit..., within allowable stress and settlement limitations, all applicable loads. Any foundation and anchorage...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., Specifications, Contract Documents and Other Documentation Part D—Inspection of Development Work Part A..., installation, device, arrangement, or method of work is at least equivalent to that prescribed in this exhibit..., within allowable stress and settlement limitations, all applicable loads. Any foundation and anchorage...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., Specifications, Contract Documents and Other Documentation Part D—Inspection of Development Work Part A..., installation, device, arrangement, or method of work is at least equivalent to that prescribed in this exhibit..., within allowable stress and settlement limitations, all applicable loads. Any foundation and anchorage...
EPA RE-Powering Mapper Completed Installations
The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.
Solar Cogeneration of Electricity and Hot Water at DoD Installations
2014-06-01
EW-201248) Solar Cogeneration of Electricity and Hot Water at DoD Installations June 2014 This report was prepared under contract to the...2014 ESTCP COST AND PERFORMANCE REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations W912HQ-12-C-0053 EW-201248Ratson...demonstrate an innovative hybrid electric/thermal solar cogeneration system, document performance and cost advantages, and develop financing models and
Moore, Natalie; Haines, Victoria; Lilley, Debra
2015-11-01
Social housing organisations are increasingly installing renewable energy technologies, particularly for the provision of heating and hot water. To meet carbon reduction targets, uptake and installation must allow occupants to use the technology effectively. This paper describes research which investigated the service of installing heat pumps into UK social housing properties, from both landlords' and tenants' experiences. Adopting a user centred design approach, the research was in three phases: an exploration study to investigate landlords' and tenants' experiences of heat pump installation and use; refinement and development of the requirements for improved service delivery, primarily technology introduction and control; and the development and initial evaluation of an information leaflet as a key touchpoint in the service delivery. Recommendations for improved service delivery, to enable heat pumps to be accepted and used more effectively, are presented, as well as reflection on the process of applying user centred design in this context. In a relatively immature area of industry, installations to date have been heavily focused on technical aspects. This paper provides an insight into the human aspects of the service delivery of heat pumps in social housing, providing designers and social housing landlords with insight about how to improve the service.
Moore, Natalie; Lilley, Debra
2015-01-01
Social housing organisations are increasingly installing renewable energy technologies, particularly for the provision of heating and hot water. To meet carbon reduction targets, uptake and installation must allow occupants to use the technology effectively. This paper describes research which investigated the service of installing heat pumps into UK social housing properties, from both landlords’ and tenants’ experiences. Adopting a user centred design approach, the research was in three phases: an exploration study to investigate landlords’ and tenants’ experiences of heat pump installation and use; refinement and development of the requirements for improved service delivery, primarily technology introduction and control; and the development and initial evaluation of an information leaflet as a key touchpoint in the service delivery. Recommendations for improved service delivery, to enable heat pumps to be accepted and used more effectively, are presented, as well as reflection on the process of applying user centred design in this context. In a relatively immature area of industry, installations to date have been heavily focused on technical aspects. This paper provides an insight into the human aspects of the service delivery of heat pumps in social housing, providing designers and social housing landlords with insight about how to improve the service. PMID:26539060
Chapter 7: Renewable Energy Options and Considerations for Net Zero Installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Booth, Samuel
This chapter focuses on renewable energy options for military installations. It discusses typical renewable technologies, project development, and gives examples. Renewable energy can be combined with conventional energy sources to provide part or all of the energy demand at an installation. The appropriate technology mix for an installation will depend on site-specific factors such as renewable resources, energy costs, local energy policies and incentives, available land, mission compatibility, and other factors. The objective of this chapter is to provide basic background information and resources on renewable energy options for NATO leaders and energy personnel.
Aerodynamics of heat exchangers for high-altitude aircraft
NASA Technical Reports Server (NTRS)
Drela, Mark
1996-01-01
Reduction of convective beat transfer with altitude dictates unusually large beat exchangers for piston- engined high-altitude aircraft The relatively large aircraft drag fraction associated with cooling at high altitudes makes the efficient design of the entire heat exchanger installation an essential part of the aircraft's aerodynamic design. The parameters that directly influence cooling drag are developed in the context of high-altitude flight Candidate wing airfoils that incorporate heat exchangers are examined. Such integrated wing-airfoil/heat-exchanger installations appear to be attractive alternatives to isolated heat.exchanger installations. Examples are drawn from integrated installations on existing or planned high-altitude aircraft.
Vehicle Support Posts Installation at Mobile Launcher
2017-05-11
Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
1995-05-01
has been in operation for over 75 years with primary mission of research, development, and testing of munitions and military vehicles. A.s a...development, and testing of munitions and military vehicles. As a results of APG being on the National Priorities List, an installation-wide health...development, and testing of chemical warfare agents and conventional munitions. The installation occupies approximately 32,400 hectares of relatively
NASA Technical Reports Server (NTRS)
Bachtell, E. E.; Thiemet, W. F.; Morosow, G.
1987-01-01
To demonstrate the design and integration of a reflective mesh surface to a deployable truss structure, a mesh reflector was installed on a 15 foot box truss cube. The specific features demonstrated include: (1) sewing seams in reflective mesh; (2) mesh stretching to desired preload; (3) installation of surface tie cords; (4) installation of reflective surface on truss; (5) setting of reflective surface; (6) verification of surface shape/accuracy; (7) storage and deployment; (8) repeatability of reflector surface; and (9) comparison of surface with predicted shape using analytical methods developed under a previous task.
Diagnosis diagrams for passing signals on an automatic block signaling railway section
NASA Astrophysics Data System (ADS)
Spunei, E.; Piroi, I.; Chioncel, C. P.; Piroi, F.
2018-01-01
This work presents a diagnosis method for railway traffic security installations. More specifically, the authors present a series of diagnosis charts for passing signals on a railway block equipped with an automatic block signaling installation. These charts are based on the exploitation electric schemes, and are subsequently used to develop a diagnosis software package. The thus developed software package contributes substantially to a reduction of failure detection and remedy for these types of installation faults. The use of the software package eliminates making wrong decisions in the fault detection process, decisions that may result in longer remedy times and, sometimes, to railway traffic events.
NASA Technical Reports Server (NTRS)
Hall, D. S.
1980-01-01
A development program was developed to design and improve the Emergency Locator Transmitter (ELT) transmitter and to improve the installation in the aircraft and its activation subsystem. There were 1135 general aviation fixed wing aircraft accident files reviewed. A detailed description of the damage to the aircraft was produced. The search aspects of these accidents were studied. As much information as possible about the ELT units in these cases was collected. The data should assist in establishing installation and mounting criteria, better design standards for activation subsystems, and requirements for the new ELT system design in the area of crashworthiness.
Defending Against Biological and Chemical Attacks
2010-08-01
addition, we field integrated installation consequence management response capabilities to select installations both at home and abroad. Just as...decon- tamination, like self-decontaminating or strippable coat- ings for vehicles; we are developing technologies to focus decontamination on the
Performance of buried pipe installation : technical summary.
DOT National Transportation Integrated Search
2010-05-01
The goal of this research project was to determine the effects of geometric and mechanical parameters characterizing the soil-structure interaction developed in a buried pipe installation. Parameters such as pipe ring stiff ness, bedding thickness, t...
CUECost workbook development documentation
This is a user's manual for the Coal Utility Environmental Cost (CUECost) workbook to estimate installed capital and annualized costs. The CUECost workbook produces rough-order-of-magnitude (ROM) cost estimates (+/-30% accuracy) of the installed capital and annualized operating c...
NASA Astrophysics Data System (ADS)
Cordes, V.
1983-09-01
Three solar generator projects in developing countries are discussed. A brackish water desalination unit was developed and built. A 2.4 kW solar generator supplies the desalination unit which produces 1.5 cum drinking water per day, and the pump installed for a hoisting depth of 20 m. The unit switches on if the solar energy is sufficiently high; a 160 Ahr battery guarantees constant operation. A photovoltaically supplied UHF transmitter was installed. A 3.6 kW solar generator and a battery make transmitter and air traffic warning illumination self-sufficient. A small diesel generator is installed for emergency cases. Experience shows that solar generator (4 kW) and battery have to be enlarged. An emergency solar energy generator was installed in a hospital. The solar generator has a maximum power of 150 W; together with a battery it can deliver the energy for a minimum 5 hr of emergency illumination.
High-power CO laser with RF discharge for isotope separation employing condensation repression
NASA Astrophysics Data System (ADS)
Baranov, I. Ya.; Koptev, A. V.
2008-10-01
High-power CO laser can be the effective tool in such applications as isotope separation using the free-jet CRISLA method. The way of transfer from CO small-scale experimental installation to industrial high-power CO lasers is proposed through the use of a low-current radio-frequency (RF) electric discharge in a supersonic stream without an electron gun. The calculation model of scaling CO laser with RF discharge in supersonic stream was developed. The developed model allows to calculate parameters of laser installation and optimize them with the purpose of reception of high efficiency and low cost of installation as a whole. The technical decision of industrial CO laser for isotope separation employing condensation repression is considered. The estimated cost of laser is some hundred thousand dollars USA and small sizes of laser head give possibility to install it in any place.
Community Crowd-Funded Solar Finance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jagerson, Gordon "Ty"
The award supported the demonstration and development of the Village Power Platform, which enables community organizations to more readily develop, finance and operate solar installations on local community organizations. The platform enables partial or complete local ownership of the solar installation. The award specifically supported key features including financial modeling tools, community communications tools, crowdfunding mechanisms, a mobile app, and other critical features.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Single family homes in urban areas that are available for renovation by nonprofit developers are often in rough shape (1MM to 2MM nationally). Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. This demonstration project aims to help nonprofit affordable housing developers become familiar with three Building America performance measures, the installation processes, and impacts and benefits of each. A story and a half home in North Minneapolis, MN was presented by Urban Homeworks our local nonprofitmore » partner. The team helped them install three researched upgrade measures: exterior roof insulation or 'overcoat,' exterior foundation insulation, or 'excavationless', and a combined space and water heating HVAC system or 'combi'. To maximize efficiency of application and to address budget issues, the Team worked with Urban Homeworks to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was extended to other nonprofit developers and industry partners to encourage dialog about the systems during live installation.« less
24 CFR 3286.7 - Consumer information.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Generally Applicable Provisions and... recommendation that any home that has been reinstalled after its original installation should be inspected after... manufactured home, the retailer must provide the purchaser or lessee with a consumer disclosure. This...
Geothermal Energy: Prospects and Problems
ERIC Educational Resources Information Center
Ritter, William W.
1973-01-01
An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)
Installation of warm mix asphalt projects in Virginia.
DOT National Transportation Integrated Search
2007-01-01
Several processes have been developed to reduce the mixing and compaction temperatures of hot mix asphalt (HMA) without sacrificing the quality of the resulting pavement. The purpose of this study was to evaluate the installation of warm mix asphalt ...
2014-02-01
installation based on a Euclidean distance allocation and assigned that installation’s threshold values. The second approach used a thin - plate spline ...installation critical nLS+ thresholds involved spatial interpolation. A thin - plate spline radial basis functions (RBF) was selected as the...the interpolation of installation results using a thin - plate spline radial basis function technique. 6.5 OBJECTIVE #5: DEVELOP AND
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wohlgemuth, John; Silverman, Timothy; Miller, David C.
This paper describes an effort to inspect and evaluate PV modules in order to determine what failure or degradation modes are occurring in field installations. This paper will report on the results of six site visits, including the Sacramento Municipal Utility District (SMUD) Hedge Array, Tucson Electric Power (TEP) Springerville, Central Florida Utility, Florida Solar Energy Center (FSEC), the TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been usedmore » to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification. TEP Solar Test Yard, and University of Toledo installations. The effort here makes use of a recently developed field inspection data collection protocol, and the results were input into a corresponding database. The results of this work have also been used to develop a draft of the IEC standard for climate and application specific accelerated stress testing beyond module qualification.« less
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Construction workers on the deck of the mobile launcher prepare the platforms for installation of vehicle support posts at NASA's Kennedy Space Center in Florida. At left, four of the support posts are installed. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
2016-10-19
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, has been installed on the south side of the high bay. In view below are several levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
24 CFR 3286.9 - Manufacturer shipment responsibilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... instructions. The manufacturer is required to provide with each manufactured home, installation designs and... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Generally Applicable Provisions and... the time that each manufactured home is shipped by a manufacturer, the manufacturer must provide HUD...
Vegetation and other development options for mitigating urban air pollution impacts
In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...
Installation and performance of lightweight aggregate asphaltic concrete test sections.
DOT National Transportation Integrated Search
1970-01-01
In 1966 and 1968 test sections of asphaltic concrete overlays fabricated with coarse lightweight aggregate and fine limestone were installed in the Roanoke-Bedford area. The experimental mixes used were designed in an attempt to develop skid resistan...
Performance evaluation of buried pipe installation : LTRC research project capsule 08-6GT.
DOT National Transportation Integrated Search
2008-03-01
The Louisiana Department of : Transportation and Development : (LADOTD) is in the process of revising : the current specifications to obtain a : more cost efficient design and : installation of buried pipes for highway : infrastructure. It aims to de...
DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krementz, D.; Coughlin, Jeffrey
2009-05-05
The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manuallymore » or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.« less
2016 End of the year South Carolina PV soft cost and workforce development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Elise B.; Edwards, Thomas B.; Drory, Michael D.
2017-08-16
A solar industry survey was given to professional installers who serve the South Carolina market in order to determine trends in costing, work force needs, and business demographics at the end of 2016. It was found that 70% of the respondents serve the residential sector, while only 7% of the total exclusively serves the residential market. The average size of residential installations remain near 9 kW-DC, while the average size of commercial and utility scale installations continue to grow to 378 kW-DC and 14.8 MW-DC, respectively. The total cost of these residential systems has hovered around $3.50/W-DC since the endmore » of 2015, while commercial installations have dropped to $2.45/W-DC and utility scale installations have dropped to $1.49/W-DC. It is expected that the cost of utility scale installations will continue to drop as there are publically reported utility scale installations with contracted PPAs for less than 4¢/kWh. 52-60% of the cost is associated with hardware only depending upon sector.« less
NASA Astrophysics Data System (ADS)
Kaplan, J. I.
1980-11-01
The work effort to design, build, install, and evaluate an inside storm window (ISW) is presented. The ISW, made of two separated layers of mylar (like a thermopane window) which, when not in use can be rolled up in a shade, is described. The work effort included: development of a prototype model; the development of production facilities to turn out a small number (50) of ISW's; the production of the windows; the installation of the windows into buildings; the building of a test chamber to determine the R value of the ISW and the subsequent determination of the R value; and a survey to determine how the residents of the homes in which ISW's were installed felt about the windows.
2017-07-01
ER D C/ CE RL T R- 17 -2 5 Army Environmental Quality Technology An Evaluation of Methods for Assessing Vulnerability of Army...Evaluation of Methods for Assessing Vulnerability of Army Installations to Impacts of Climate Change on Listed and At-Risk Species Matthew G. Hohmann...their suitability for informing BRAC-related evaluations. Three recently developed methods for assessing the vulnerability of Army installations to
24 CFR 3285.502 - Expanding rooms.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.502 Expanding rooms. The support and anchoring systems for expanding rooms must be installed in accordance with designs provided by the home manufacturer or prepared by a registered professional engineer or registered architect, in...
Solar Energy Installers Curriculum Guides. Final Report.
ERIC Educational Resources Information Center
Walker, Gene C.
A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…
Startup Notification Report 3rd Quarter FY17.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Freeman, Roger D.; Petti, Jason P.
2017-11-01
This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.
DOT National Transportation Integrated Search
2016-09-01
The objectives of this study are to develop and deploy a means for cost-effectively extracting curve information using the widely available GPS and GIS data to support high friction surface treatment (HFST) installation recommendations (i.e., start a...
DOT National Transportation Integrated Search
2015-11-01
Several national standards and specification have been developed for design, installation, : and materials for precast concrete pipe, corrugated metal pipe, and HDPE pipes. However, : no national accepted installation standard or design method is ava...
32 CFR 700.325 - The Assistant Secretary of the Navy (Installations and Environment).
Code of Federal Regulations, 2011 CFR
2011-07-01
... Secretary of the Navy (Installations and Environment) is responsible for: (a) Policy relating to Navy...) Development, implementation and evaluation of military construction, facilities management and engineering, strategic homeporting, housing, utilities, and base utilization issues; (c) Environmental policy, safety...
Implementing ARFORGEN: Installation Capability and Feasibility Study of Meeting ARFORGEN Guidelines
2007-07-26
aligning troop requirements with the Army’s new strategic mission, the force stabilization element of ARFORGEN was developed to raise the morale of...a discrete event simulation model developed for the project to mirror the reset process. The Unit Reset model is implemented in Java as a discrete...and transportation. Further, the typical installation support staff is manned by a Table of Distribution and Allowance ( TDA ) designed to
Preliminary design package for maxi-therm heat exchanger module
NASA Technical Reports Server (NTRS)
1978-01-01
Heat exchangers were developed for use in a solar heating and cooling system installed in a single family dwelling. Each of the three exchangers consisted of a heating and cooling module and a submersed electric water heating element. Information necessary to evaluate the preliminary design of the heat exchanger is presented in terms of the development and verification plans, performance specifications, installation and maintenance, and hazard analysis.
Environmental Assessment of Installation Development at McConnell Air Force Base, Kansas
2012-12-01
potential for these species to occur on the installation. Despite the lack of suitable habitat for residency or breeding, four federally listed birds ... species or suitable habitat at McConnell AFB. Environmental protection measures would be implemented to minimize impacts on migratory birds as...the DBA, and measures developed to avoid impacts to migratory bird species , and their habitats during tlle jmplementation of all aspects of this
Gao, Junhong; Wan, Hong; Kong, Wei; Yue, Hong
2012-01-01
To provide a suitable vehicle-mounted installation to solve the problem of drinking water in the wild. The vehicle-mounted drinking water installation, made up of pre-treatment unit, purification unit, box and VECU, was used to storage, transport and purify water in the wild. The effect of purification was detected by assembling the installation in the wild and observing the change of water turbidity, TDS, the number of total bacteria and coliform bacteria before and after the treatment of water sources. The wild water sources, such as river water, rainwater, well water and spring water could be purified, and the quality of the treated water could meet the requirement of Drinking Water Quality Standard of CJ94-2005. The vehicle-mounted drinking water installation is suitable for purifying water sources in the wild for drinking use.
NASA Technical Reports Server (NTRS)
1981-01-01
Relevant differences between the MPPM resident IBM 370computer and the NASA Sigma 9 computer are described as well as the MPPM system itself and its development. Problems encountered and solutions used to overcome these difficulties during installation of the MPPM system at MSFC are discussed. Remaining work on the installation effort is summarized. The relevant hardware features incorporated in the program are described and their implications on the transportability of the MPPM source code are examined.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greene, J.A.
1991-06-01
A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included.
Pavlovich, Mark; Greene, Brandon F.
1984-01-01
In this study, we describe the development and evaluation of a self-instructional program for installing 10 low-cost/no-cost weatherization materials (e.g., weatherstripping, caulking). This program was a weatherization and retrofit manual (WARM) providing step-by-step instructions and illustrations. Boy and Girl Scouts participated and used either the WARM or existing product instructions (EPI) to apply the materials. Scouts installed the materials properly only when they used the WARM. PMID:16795671
Evaluation of a pilot installation of an energy absorbing bridge rail.
DOT National Transportation Integrated Search
1978-01-01
A newly developed bridge rail which uses steel rings that collapse or deform to absorb the energy of an impacting vehicle was retrofitted to the concrete parapet of an existing interstate highway bridge. It was planned that the installation would be ...
24 CFR 3285.302 - Flood hazard areas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... loads associated with design flood and wind events or combined wind and flood events, and homes must be installed on foundation supports that are designed and anchored to prevent floatation, collapse, or lateral... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Foundations § 3285.302 Flood hazard...
24 CFR 3285.601 - Field assembly.
Code of Federal Regulations, 2010 CFR
2010-04-01
... parts that are necessary to join all sections of the home and are designed to be located underneath the home. The installation instructions must be designed in accordance with applicable requirements of part... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems...
24 CFR 3285.604 - Drainage system.
Code of Federal Regulations, 2010 CFR
2010-04-01
... require drainage system crossover connections to join all sections of the home. The crossover design... all sections of the home and designed to be located underneath the home, they must be installed and... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply Systems...
AVOSS Windline at Dallas/Ft. Worth Airport Volume 1 Installation and Operation
DOT National Transportation Integrated Search
2001-05-01
A 259-meter windline, with horizontal and vertical single-axis anemometers mounted on 9-meter poles, was installed at the Dallas/Ft. Worth Airport under the approach to Runway 17C, as part of NASA's Aircraft Vortex Spacing System (AVOSS) development ...
24 CFR 3285.402 - Ground anchor installations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285... conforming to ASTM D 3953—97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by... in ASTM D 3953-97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by...
24 CFR 3285.402 - Ground anchor installations.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285... conforming to ASTM D 3953—97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by... in ASTM D 3953-97, Standard Specification for Strapping, Flat Steel and Seals (incorporated by...
DOT National Transportation Integrated Search
2009-03-01
This project was an implementation of research conducted under TxDOT Research Project 0-4124 on the use : of post-installed shear connectors to develop composite action in existing non-composite steel bridge girder : systems. In this implementation s...
NASA Technical Reports Server (NTRS)
Navaneethan, R.; Hunt, J.; Quayle, B.
1982-01-01
Tests were carried out on 20 inch x 20 inch panels at different test conditions using free-free panels, clamped panels, and panels as installed in the KU-FRL acoustic test facility. Tests with free-free panels verified the basic equipment set-up and test procedure. They also provided a basis for comparison. The results indicate that the effect of installed panels is to increase the damping ratio at the same frequency. However, a direct comparison is not possible, as the fundamental frequency of a free-free panel differs from the resonance frequency of the panel when installed. The damping values of panels installed in the test facility are closer to the damping values obtained with fixed-fixed panels. Effects of damping tape, stiffeners, and bonded and riveted edged conditions were also investigated. Progress in the development of a simple interior noise level control program is reported.
O’Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naïm
2018-01-30
The solar photovoltaic (PV) installation industry comprises thousands of firms around the world who collectively installed nearly 200 million panels in 2015. Spatial analysis of the emerging industry has received considerable attention from the literature, especially on the demand side concerning peer effects and adopter clustering. However this research area does not include similarly sophisticated spatial analysis on the supply side of the installation industry. The lack of understanding of the spatial structure of the PV installation industry leaves PV market research to rely on jurisdictional lines, such as counties, to define geographic PV markets. We develop an approach thatmore » uses the spatial distribution of installers' activity to define geographic boundaries for PV markets. Our method is useful for PV market research and applicable in the contexts of other industries. We use our approach to demonstrate that the PV industry in the United States is spatially heterogeneous. Despite the emergence of some national-scale PV installers, installers are largely local and installer communities are unique from one region to the next. The social implications of the spatial heterogeneity of the emerging PV industry involve improving understanding of issues such as market power, industry consolidation, and how much choice potential adopters have.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
O’Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naïm
The solar photovoltaic (PV) installation industry comprises thousands of firms around the world who collectively installed nearly 200 million panels in 2015. Spatial analysis of the emerging industry has received considerable attention from the literature, especially on the demand side concerning peer effects and adopter clustering. However this research area does not include similarly sophisticated spatial analysis on the supply side of the installation industry. The lack of understanding of the spatial structure of the PV installation industry leaves PV market research to rely on jurisdictional lines, such as counties, to define geographic PV markets. We develop an approach thatmore » uses the spatial distribution of installers' activity to define geographic boundaries for PV markets. Our method is useful for PV market research and applicable in the contexts of other industries. We use our approach to demonstrate that the PV industry in the United States is spatially heterogeneous. Despite the emergence of some national-scale PV installers, installers are largely local and installer communities are unique from one region to the next. The social implications of the spatial heterogeneity of the emerging PV industry involve improving understanding of issues such as market power, industry consolidation, and how much choice potential adopters have.« less
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Four vehicle support posts have been installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
2016-10-19
A heavy-lift crane lowers the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, for installation on the south side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
NorthernSTAR 1-1/2-Story Demonstration House of Cold Climate Solutions for Affordable Housing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schirber, T.; Ojczyk, C.; Jacobson, R.
Single family homes in urban areas that are available for renovation by nonprofit developers are often in rough shape (1MM to 2MM nationally). Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. This demonstration project aims to help nonprofit affordable housing developers become familiar with three Building America performance measures, the installation processes, and impacts and benefits of each. A story and a half home in North Minneapolis, MN was presented by Urban Homeworks our local nonprofitmore » partner. The team helped them install three researched upgrade measures: exterior roof insulation or 'overcoat,' exterior foundation insulation, or 'excavationless', and a combined space and water heating HVAC system or 'combi'. To maximize efficiency of application and to address budget issues, the Team worked with Urban Homeworks to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was extended to other nonprofit developers and industry partners to encourage dialog about the systems during live installation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.
This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components onmore » a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.« less
NASA Astrophysics Data System (ADS)
Dovbysh, V. O.; Burakova, L. N.; Burakova, A. D.
2018-01-01
The article raises the problem of the maintenance of the urban area in winter, namely, the problem of disposal of snow masses from the urban area. The article describes the main disadvantages of the existing snow-melting systems for the utilization of city snow mass and are encouraged to develop an installation for melting of snow, functioning at the expense of power consumption. The developed installation allows to reduce the noise level during its operation, to exclude the influence of exhaust gases on the environment, therefore, to improve the environmental safety of the urban infrastructure.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-10
... for, the manufacture, preproduction design validation (including a process to assess the performance... requirements governing the design, manufacture, packing, labeling, storage, installation, and servicing of all... for Quality Assurance in Design/Development, Production, Installation, and Servicing.'' The CGMP/QS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
... facilities and controls used for, the manufacture, preproduction design validation (including a process to... requirements governing the design, manufacture, packing, labeling, storage, installation, and servicing of all... Model for Quality Assurance in Design/Development, Production, Installation, and Servicing.'' The CGMP...
24 CFR 3286.102 - Information provided by manufacturer.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD-Administered States § 3286.102 Information provided by manufacturer. (a) Shipment of home to retailer or distributor. At the time the manufactured home is shipped to a retailer or distributor, the manufacturer must...
24 CFR 3285.803 - Interior close-up.
Code of Federal Regulations, 2010 CFR
2010-04-01
...: Specific designs must be approved by a DAPIA and included in the home manufacturer installation... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Exterior and Interior Close-Up § 3285.803 Interior... doors. (b) Interior close up items necessary to join all sections of the home or items subject to...
24 CFR 3285.905 - Heating oil systems.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Heating oil systems. 3285.905... Installation Instructions § 3285.905 Heating oil systems. It is recommended that the installation instructions include the following information related to heating oil systems, when applicable: (a) Homes equipped with...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2011 CFR
2011-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2014 CFR
2014-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
7 CFR 3560.53 - Eligible use of funds.
Code of Federal Regulations, 2012 CFR
2012-01-01
... of the site immediately prior to purchase. (e) Develop and install necessary systems. Funds may be used to install streets, a water supply, sewage disposal, heating and cooling systems, electric, gas, solar, or other power sources for lighting and other features necessary for the housing. If such...
24 CFR 3285.905 - Heating oil systems.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Heating oil systems. 3285.905... Installation Instructions § 3285.905 Heating oil systems. It is recommended that the installation instructions include the following information related to heating oil systems, when applicable: (a) Homes equipped with...
24 CFR 3285.905 - Heating oil systems.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Heating oil systems. 3285.905... Installation Instructions § 3285.905 Heating oil systems. It is recommended that the installation instructions include the following information related to heating oil systems, when applicable: (a) Homes equipped with...
ERIC Educational Resources Information Center
Baskas, Richard S.
2012-01-01
Government budget constraints had forced the Emergency Dispatch Center (EDC) at a military installation to work with less than the normal number of staff. A Program Proposal was developed previously that had determined that a learning gap existed in the researcher's work environment at a military installation. To counter this gap, Learning Tasks…
Quantifying Impacts of Urban Growth Potential on Army Training Capabilities
2017-09-12
Capacity” ERDC/CERL TR-17-34 ii Abstract Building on previous studies of urban growth and population effects on U.S. military installations and...combat team studies . CAA has developed an iterative process that builds on Military Value Anal- ysis (MVA) models that include a set of attributes that...Methods and tools were developed to support a nationwide analysis. This study focused on installations operating training areas that were high
Treasure Transformers: Novel Interpretative Installations for the National Palace Museum
NASA Astrophysics Data System (ADS)
Hsieh, Chun-Ko; Liu, I.-Ling; Lin, Quo-Ping; Chan, Li-Wen; Hsiao, Chuan-Heng; Hung, Yi-Ping
Museums have missions to increase accessibility and share cultural assets to the public. The National Palace Museum intends to be a pioneer of utilizing novel interpretative installations to reach more diverse and potential audiences, and Human-Computer Interaction (HCI) technology has been selected as the new interpretative approach. The pilot project in partnership with the National Taiwan University has successfully completed four interactive installations. To consider the different nature of collections, the four systems designed against different interpretation strategies are uPoster, i-m-Top, Magic Crystal Ball and Virtual Panel. To assess the feasibility of the project, the interactive installations were exhibited at the Taipei World Trade Center in 2008. The purpose of this paper is to present the development of the "Treasure Transformers" exhibition, design principles, and effectiveness of installations from the evaluation. It is our ambition that the contributions will propose innovative media approaches in museum settings.
NASA Astrophysics Data System (ADS)
Sweet, J. R.; Beaudoin, B. C.; Barstow, N.; Pfeifer, M.; Anderson, K. R.; Frassetto, A.
2015-12-01
Advances in seismometer design have diversified the range of instruments available for use in temporary field installations. IRIS programs, primarily PASSCAL and the Transportable Array (TA), have helped steer development of these new instruments to meet these evolving needs. PASSCAL operates a small pool of posthole broadband sensors, purpose built for direct burial. Near surface posthole installations are a new, cost effective, and logistically simple technique for broadband emplacement that is an alternative to the vault installations used in portable broadband seismic experiments for nearly 30 years. Direct burial installation is limited to the time and effort required to dig the borehole and emplace the sensor, thus reducing both material costs and time to install. Also, in Alaska, extreme environments and difficult logistics make standard TA tank vaults inappropriate for most sites. TA has developed improved deployment strategies for these environments. There, holes for posthole sensors are hammer- drilled or augered to several meters depth in soil, permafrost, or bedrock and then cased. These emplacement costs are generally less than standard TA vaults. We compare various installation techniques for test cases as well as general deployments of PASSCAL and TA stations. Automated noise performance analyses have been part of the TA throughout its operation, but until recently vault performance for portable installations supported by the PASSCAL program was sparse. In this study, we select a suite of co-located direct burial and surface vault installations and compare their noise performance using probability density functions. Our initial analyses suggest that direct burial sensors have lower noise levels than vault installations on both horizontal and vertical channels across a range of periods spanning <1 s to 100 s. However, most of these initial experiments for PASSCAL were with sensors not purpose built for direct burial and it became obvious that a sensor designed for direct burial was necessary. For the TA, direct emplacement of purpose-built sensors has routinely improved noise levels, particularly beyond about 20 s, by tens of dB. These results suggest that moving towards an instrument pool composed primarily of purpose-built direct burial sensors could yield higher-quality data at lower cost.
24 CFR 3285.606 - Ductwork connections.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply... type duct, the straps must be at least 1/2″ wider than the spacing of the metal spirals encasing the duct. The ducts must be installed such that the straps cannot slip between any two spirals and arranged...
Regional Information System for Educators: Installation and Evaluation.
ERIC Educational Resources Information Center
Kromer, Charles
This document describes the installation and evaluation of the Regional Information System within the Michigan-Ohio Regional Educational Laboratory (MOREL). MOREL is an agency established to develop and test alternatives to current educational practice under Title IV of ESEA. The Regional Information System was established to provide referrals to…
24 CFR 3285.903 - Permits, alterations, and on-site structures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for... from property lines and public roads are met. (b) Alterations. Prior to making any alteration to a home...) Installation of on-site structures. Each accessory building and structure is designed to support all of its own...
24 CFR 3285.801 - Exterior close-up.
Code of Federal Regulations, 2010 CFR
2010-04-01
... home manufacturer must provide materials and designs for mate-line gaskets or other methods designed to... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Exterior and Interior Close-Up § 3285.801 Exterior close-up. (a) Exterior siding and roofing necessary to join all sections of the home must be installed...
Silt fences: An economical technique for measuring hillslope soil erosion
Peter R. Robichaud; Robert E. Brown
2002-01-01
Measuring hillslope erosion has historically been a costly, time-consuming practice. An easy to install low-cost technique using silt fences (geotextile fabric) and tipping bucket rain gauges to measure onsite hillslope erosion was developed and tested. Equipment requirements, installation procedures, statistical design, and analysis methods for measuring hillslope...
Installing a Microcomputer Lab in a Medium-Sized Academic Library.
ERIC Educational Resources Information Center
Hallman, Clark N.; And Others
Designed to serve as a blueprint for other libraries developing plans for microcomputer facilities, this report describes the planning and implementation of a microcomputer laboratory at South Dakota State University's Hilton M. Briggs Library. The university's plan for installing microcomputer labs on campus and the initial planning process…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-19
... real-time, multiple-strategy approach (i.e., appropriate grout design and installation, installed... is available in ADAMS) is provided the first time that a document is referenced. Revision 2 of... ``Regulatory Guide'' series. This series was developed to describe and make available to the public information...
24 CFR 3285.103 - Site suitability with design zone maps.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation....305(c)(2) of the Manufactured Home Construction and Safety Standards in this chapter. (b) Roof load... § 3280.305(c)(3) of the Manufactured Home Construction and Safety Standards in this chapter. Refer to...
24 CFR 3285.103 - Site suitability with design zone maps.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation....305(c)(2) of the Manufactured Home Construction and Safety Standards in this chapter. (b) Roof load... § 3280.305(c)(3) of the Manufactured Home Construction and Safety Standards in this chapter. Refer to...
24 CFR 3285.103 - Site suitability with design zone maps.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation....305(c)(2) of the Manufactured Home Construction and Safety Standards in this chapter. (b) Roof load... § 3280.305(c)(3) of the Manufactured Home Construction and Safety Standards in this chapter. Refer to...
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Minimum elements to be inspected...-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home... the installation elements included in a checklist. The checklist must include assurance that each of...
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Minimum elements to be inspected...-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home... the installation elements included in a checklist. The checklist must include assurance that each of...
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Minimum elements to be inspected...-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home... the installation elements included in a checklist. The checklist must include assurance that each of...
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Minimum elements to be inspected...-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home... the installation elements included in a checklist. The checklist must include assurance that each of...
DOT National Transportation Integrated Search
1978-06-01
A plow-resistant recessed reflective marker (RRM) delineation system having a linear tapered profile and which uses a reflector base/reflector unit is proposed. A single-operator mechanized vehicle to install the RRM delineation system is described. ...
24 CFR 3285.606 - Ductwork connections.
Code of Federal Regulations, 2011 CFR
2011-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Ductwork and Plumbing and Fuel Supply... type duct, the straps must be at least 1/2″ wider than the spacing of the metal spirals encasing the duct. The ducts must be installed such that the straps cannot slip between any two spirals and arranged...
24 CFR 3286.407 - Supervising work of crew.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Supervising work of crew. 3286.407... HUD-Administered States § 3286.407 Supervising work of crew. The installer will be responsible for the work performed by each person engaged to perform installation tasks on a manufactured home, in...
DOT National Transportation Integrated Search
1995-01-01
This report describes a study of shoulder harness installation and use rates in general aviation aircraft. Observations were made at six geographically separate areas to determine estimates of current installation and use rates. An expert panel was e...
An Update on Structural Seal Development at NASA GRC
NASA Technical Reports Server (NTRS)
Dunlap, Pat; Steinetz, Bruce; Finkbeiner, Josh; DeMange, Jeff; Taylor, Shawn; Daniels, Chris; Oswald, Jay
2006-01-01
A viewgraph presentation describing advanced structural seal development for NASA exploration is shown. The topics include: 1) GRC Structural Seals Team Research Areas; 2) Research Areas & Objective; 3) Wafer Seal Geometry/Flow Investigations; 4) Wafer Seal Installation DOE Study; 5) Results of Wafer Seal Installation DOE Study; 6) Wafer Geometry Study: Thickness Variations; 7) Wafer Geometry Study: Full-Size vs. Half-Size Wafers; 8) Spring Tube Seal Development; 9) Resiliency Improvement for Rene 41 Spring Tube; 10) Spring Tube Seals: Go-Forward Plan; 11) High Temperature Seal Preloader Development: TZM Canted Coil Spring; 12) TZM Canted Coil Spring Development; 13) Arc Jet Test Rig Development; and 14) Arc Jet Test Rig Status.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-25
Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare to install a vehicle support post. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-25
At NASA's Kennedy Space Center in Florida, construction workers on the deck of the mobile launcher install the final four vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-25
At NASA's Kennedy Space Center in Florida, the final four vehicle support posts are being installed on the deck of the mobile launcher. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare a platform for installation of a vehicle support post. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
In view are three vehicle support posts installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Automated Installation Verification of COMSOL via LiveLink for MATLAB
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crowell, Michael W
Verifying that a local software installation performs as the developer intends is a potentially time-consuming but necessary step for nuclear safety-related codes. Automating this process not only saves time, but can increase reliability and scope of verification compared to ‘hand’ comparisons. While COMSOL does not include automatic installation verification as many commercial codes do, it does provide tools such as LiveLink™ for MATLAB® and the COMSOL API for use with Java® through which the user can automate the process. Here we present a successful automated verification example of a local COMSOL 5.0 installation for nuclear safety-related calculations at the Oakmore » Ridge National Laboratory’s High Flux Isotope Reactor (HFIR).« less
2016-11-10
A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
Bridging the Gap: Developing a Tool to Support Local Civilian and Military Disaster Preparedness
2010-01-01
HSC, 2005), the National Strategy for Physical Protection of Critical Infrastructures and Key Assets (DHS, 2003b), the National Strategy for Mari- time...10-2501 (p. 46), The installation CEMP 10-2 provides comprehensive guidance for emergency response to physical threats resulting from major accidents...installations must develop a CEMP 10-2 using the AF [Air Force] template to address the physical threats to their base. . . . The CEMP 10-2 should be
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adkins, Brian; Castilone, Lisa
The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work inmore » this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.« less
Distributed Wind Soft Costs: A Beginning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jimenez, Tony; Forsyth,Trudy; Preus, Robert
2016-06-14
Tony Jimenez presented this overview of distributed wind soft costs at the 2016 Small Wind Conference in Stevens Point, Wisconsin, on June 14, 2016. Soft costs are any non-hardware project costs, such as costs related to permitting fees, installer/developer profit, taxes, transaction costs, permitting, installation, indirect corporate costs, installation labor, and supply chain costs. This presentation provides an overview of soft costs, a distributed wind project taxonomy (of which soft costs are a subset), an alpha data set project demographics, data summary, and future work in this area.
Photovoltaics Innovation Roadmap Request for Information Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
On June 28, 2017, the U.S. Department of Energy’s Solar Energy Technologies Office (SETO) released the Photovoltaics (PV) Innovation Roadmap Request for Information (RFI) for public response and comment. The RFI sought feedback from PV stakeholders, including research and commercial communities, about the most important research and development (R&D) pathways to improve PV cell and module technology to reach the SETO’s SunShot 2030 cost targets of $0.03/W for utility PV installations, $0.04/W for commercial scale installations, and $0.05/W for residential PV installations.
2011-03-15
Lone Eagle Street Columbus Ohio 43228 Installation trades personnel 5/7/2009 12:00:00AM 10/31/2010 12:00:00AM Sub Contractor Numbers (c): Patent...43026-2573 Pipe fitter installation trades personnel. 10/21/2009 12:00:00AM 1/31/2011 12:00:00AM Sub Contractor Numbers (c): Patent Clause Number...City Electric Company 1099 Sullivant Avenue Columbus Ohio 43223 Electrical installation trades personnel 4/5/2009 12:00:00AM 9/30/2010 12:00:00AM
Contaminated waste incinerator modification study. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolf, F.
1995-08-01
An explosive waste incinerator (EWI) can be installed in the existing Badger AAP Contaminated Waste Processor (CWP). An engineering evaluation of installing a rotary kiln furnace to dispose of waste energetic material has shown the installation to be possible. An extensive literature search was completed to develop the known proven methods of energetic waste disposal. Current incineration practice including thermal treatment alternatives was investigated. Existing and new equipment was reviewed for adequacy. Current CWP operations and hazardous waste to be disposed of were determined. Comparisons were made with other AAP`s EWI.
Effects of Large-Scale Solar Installations on Dust Mobilization and Air Quality
NASA Astrophysics Data System (ADS)
Pratt, J. T.; Singh, D.; Diffenbaugh, N. S.
2012-12-01
Large-scale solar projects are increasingly being developed worldwide and many of these installations are located in arid, desert regions. To examine the effects of these projects on regional dust mobilization and air quality, we analyze aerosol product data from NASA's Multi-angle Imaging Spectroradiometer (MISR) at annual and seasonal time intervals near fifteen photovoltaic and solar thermal stations ranging from 5-200 MW (12-4,942 acres) in size. The stations are distributed over eight different countries and were chosen based on size, location and installation date; most of the installations are large-scale, took place in desert climates and were installed between 2006 and 2010. We also consider air quality measurements of particulate matter between 2.5 and 10 micrometers (PM10) from the Environmental Protection Agency (EPA) monitoring sites near and downwind from the project installations in the U.S. We use monthly wind data from the NOAA's National Center for Atmospheric Prediction (NCEP) Global Reanalysis to select the stations downwind from the installations, and then perform statistical analysis on the data to identify any significant changes in these quantities. We find that fourteen of the fifteen regions have lower aerosol product after the start of the installations as well as all six PM10 monitoring stations showing lower particulate matter measurements after construction commenced. Results fail to show any statistically significant differences in aerosol optical index or PM10 measurements before and after the large-scale solar installations. However, many of the large installations are very recent, and there is insufficient data to fully understand the long-term effects on air quality. More data and higher resolution analysis is necessary to better understand the relationship between large-scale solar, dust and air quality.
24 CFR 3285.405 - Severe wind zones.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Anchorage Against Wind § 3285.405 Severe wind zones. When any part of a home is installed within 1,500 feet of a coastline in Wind Zones II or III, the manufactured home must be designed for the increased requirements, as specified on the home's data plate (refer...
DOT National Transportation Integrated Search
2017-03-01
In Implementation Project 5-6719, a non-composite continuous steel girder bridge located in Lakeport, Texas will be strengthened using techniques developed in TxDOT Research Project 0-6719. This strengthening technique involves the use of post-instal...
Cumulative effects: Managing natural resources for resilience in the urban context
Sarah C. Low
2014-01-01
Cities throughout the United States have started developing policies and plans that prioritize the installation of green infrastructure for the reduction of stormwater runoff. The installation of green infrastructure as a managed asset involves relying on natural resources to provide a predictable ecosystem service, stormwater retention. The placement of green...
FORCHECK -- A Fortran Verifier and Programming Aid
NASA Astrophysics Data System (ADS)
Lawden, M. D.
FORCHECK is a Fortran verifier and programming aid which has been purchased from Polyhedron software and installed on the Starlink Database computer (STADAT) for the use of all Starlink users. It was developed by Erik W. Kruyt at Leiden University. It is only available on STADAT and is not installed on any other Starlink nodes.
Installation package for SIMS prototype system 2, solar hot water
NASA Technical Reports Server (NTRS)
1978-01-01
The prototype system 2 solar hot water was designed for use in a single family dwelling and consists of the following subsystems: collector, storage, energy transport, and control. Guidelines are presented for utilization in the development of detailed installation plans and specifications. Instruction on operation, maintenance, and repair of the system is discussed.
DOT National Transportation Integrated Search
2011-02-01
A new method of cable installation using a heavy-duty Cone Penetration Test : (CPT) truck was developed and practiced successfully in this study. The coaxial and fiber : optic cables were pushed along with the cone rods by the hydraulic system integr...
Composite rotor blades for large wind energy installations
NASA Technical Reports Server (NTRS)
Kussmann, A.; Molly, J.; Muser, D.
1980-01-01
The design of large wind power systems in Germany is reviewed with attention given to elaboration of the total wind energy system, aerodynamic design of the rotor blade, and wind loading effects. Particular consideration is given to the development of composite glass fiber/plastic or carbon fiber/plastic rotor blades for such installations.
The implementation of physical safety system in bunker of the electron beam accelerator
NASA Astrophysics Data System (ADS)
Ahmad, M. A.; Hashim, S. A.; Ahmad, A.; Leo, K. W.; Chulan, R. M.; Dalim, Y.; Baijan, A. H.; Zain, M. F.; Ros, R. C.
2017-01-01
This paper describes the implementation of physical safety system for the new low energy electron beam (EB) accelerator installed at Block 43T Nuclear Malaysia. The low energy EB is a locally designed and developed with a target energy of 300 keV. The issues on radiation protection have been addressed by the installation of radiation shielding in the form of a bunker and installation radiation monitors. Additional precaution is needed to ensure that personnel are not exposed to radiation and other physical hazards. Unintentional access to the radiation room can cause serious hazard and hence safety features must be installed to prevent such events. In this work we design and built a control and monitoring system for the shielding door. The system provides signals to the EB control panel to allow or prevent operation. The design includes limit switches, key-activated switches and emergency stop button and surveillance camera. Entry procedure is also developed as written record and for information purposes. As a result, through this safety implementation human error will be prevented, increase alertness during operation and minimizing unnecessary radiation exposure.
Solar energy development impacts on land cover change and protected areas
Hernandez, Rebecca R.; Hoffacker, Madison K.; Murphy-Mariscal, Michelle L.; Wu, Grace C.; Allen, Michael F.
2015-01-01
Decisions determining the use of land for energy are of exigent concern as land scarcity, the need for ecosystem services, and demands for energy generation have concomitantly increased globally. Utility-scale solar energy (USSE) [i.e., ≥1 megawatt (MW)] development requires large quantities of space and land; however, studies quantifying the effect of USSE on land cover change and protected areas are limited. We assessed siting impacts of >160 USSE installations by technology type [photovoltaic (PV) vs. concentrating solar power (CSP)], area (in square kilometers), and capacity (in MW) within the global solar hot spot of the state of California (United States). Additionally, we used the Carnegie Energy and Environmental Compatibility model, a multiple criteria model, to quantify each installation according to environmental and technical compatibility. Last, we evaluated installations according to their proximity to protected areas, including inventoried roadless areas, endangered and threatened species habitat, and federally protected areas. We found the plurality of USSE (6,995 MW) in California is sited in shrublands and scrublands, comprising 375 km2 of land cover change. Twenty-eight percent of USSE installations are located in croplands and pastures, comprising 155 km2 of change. Less than 15% of USSE installations are sited in “Compatible” areas. The majority of “Incompatible” USSE power plants are sited far from existing transmission infrastructure, and all USSE installations average at most 7 and 5 km from protected areas, for PV and CSP, respectively. Where energy, food, and conservation goals intersect, environmental compatibility can be achieved when resource opportunities, constraints, and trade-offs are integrated into siting decisions. PMID:26483467
Trillium Horizon, A Small Portable Observatory Grade Seismometer For Direct Bury And Vault Use
NASA Astrophysics Data System (ADS)
Moores, A.; Parker, T.; Bainbridge, G.
2017-12-01
As of August 2017 almost 5 years of data have been collected from broadband seismic sensors designed for direct burial applications. These first posthole instruments have been deployed in a wide range of extremely challenging environments such as dynamic ice and snow environments, extreme wet and dry conditions in soils of high clay content, and steep creeping terrain. In all use cases the direct burial approach has consistently provided high quality data when compared to shallow vault installations. In this presentation we extract and analyze operational performance data, including tilt information from mass position time series recorded at direct burial installations and at temporary shallow vault deployments. This data shows that while higher tilt tolerance is required for data quality outcome certainty in some installations, the majority of installations can be addressed by a smaller instrument with a narrower tilt range hence reducing size and cost. The lessons learned from this real world field data have guided the development of a new smaller, less expensive instrument, Trillium Horizon.Based on this analysis and and user feedback from many direct burial deployments, the Trillium Horizon seismometer has been developed as a simple versatile instrument to span the majority of deployment scenarios and specific use cases including shallow direct bury deployments, traditional piers, and problematic wet vault installs. With its small size, robust waterproof case and connector, +/-1.5° tilt range, dual-purpose cable, and accessories for both posthole and vault installation, Trillium Horizon is optimized for usability as well as performance.
Solar Energy Development Impacts on Land-Cover Change and Protected Areas
NASA Astrophysics Data System (ADS)
Hoffacker, M. K.; Hernandez, R. R.; Murphy-Mariscal, M. L.; Wu, G. C.; Allen, M. F.
2015-12-01
Decisions determining the use of land for energy are of exigent concern as land scarcity, the need for ecosystem services, and demands for energy generation have concomitantly increased globally. Utility-scale solar energy (USSE; i.e., ≥ 1 megawatt [MW]) development requires large quantities of space and land; however, studies quantifying the effect of USSE on land-cover change and protected areas are limited. We assessed siting impacts of >160 USSE installations by technology type (photovoltaic [PV] vs. concentrating solar power [CSP]), area (km2), and capacity (MW) within the global solar hotspot of the state of California (USA). Additionally, we utilized the Carnegie Energy and Environmental Compatibility Model, a multiple criteria model, to quantify each installation according to environmental and technical compatibility. Lastly, we evaluated installations according to their proximity to protected areas, including inventoried roadless areas, endangered and threatened species habitat, and federally protected areas. We found the plurality of USSE (6,995 MW) in California is sited in shrub- and scrublands, comprising 375 km2 of land-cover change. Twenty-eight percent of USSE installations are located in croplands and pastures, comprising 155 km2 of change. Less than 15% of USSE installations are sited in compatible areas. The majority of incompatible USSE power plants are sited far from existing transmission infrastructure and all USSE installations average at most seven and five km from protected areas, for PV and CSP, respectively. Where energy, food, and conservation goals intersect, environmental compatibility can be achieved when resource opportunities, constraints, and trade-offs are integrated into siting decisions.
Solar energy development impacts on land cover change and protected areas.
Hernandez, Rebecca R; Hoffacker, Madison K; Murphy-Mariscal, Michelle L; Wu, Grace C; Allen, Michael F
2015-11-03
Decisions determining the use of land for energy are of exigent concern as land scarcity, the need for ecosystem services, and demands for energy generation have concomitantly increased globally. Utility-scale solar energy (USSE) [i.e., ≥ 1 megawatt (MW)] development requires large quantities of space and land; however, studies quantifying the effect of USSE on land cover change and protected areas are limited. We assessed siting impacts of >160 USSE installations by technology type [photovoltaic (PV) vs. concentrating solar power (CSP)], area (in square kilometers), and capacity (in MW) within the global solar hot spot of the state of California (United States). Additionally, we used the Carnegie Energy and Environmental Compatibility model, a multiple criteria model, to quantify each installation according to environmental and technical compatibility. Last, we evaluated installations according to their proximity to protected areas, including inventoried roadless areas, endangered and threatened species habitat, and federally protected areas. We found the plurality of USSE (6,995 MW) in California is sited in shrublands and scrublands, comprising 375 km(2) of land cover change. Twenty-eight percent of USSE installations are located in croplands and pastures, comprising 155 km(2) of change. Less than 15% of USSE installations are sited in "Compatible" areas. The majority of "Incompatible" USSE power plants are sited far from existing transmission infrastructure, and all USSE installations average at most 7 and 5 km from protected areas, for PV and CSP, respectively. Where energy, food, and conservation goals intersect, environmental compatibility can be achieved when resource opportunities, constraints, and trade-offs are integrated into siting decisions.
NASA Astrophysics Data System (ADS)
Afshari, E.; Afshari, S.
2005-12-01
This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.
Development of Active Flutter Suppression Wind Tunnel Testing Technology
1975-01-01
inch stainless steel precision haft ng out to the aileron surfaces. Torque was then transmitted aft through another crank-pushrod linkage...NMMltetiM Clllir llllisi Sl> ptT »I»" CmrN StiiiH tli!ii<ti> »ir|wu ŗK kUfej •*! AFFDL-TR-74-126 o 00 DEVELOPMENT OF ACTIVE FLUTTER...Installations . . 28 14. Outboard Aileron Installation 30 15. Airplane FMCS Block Diagram 35 16. Model FMCS Block Diagram 36 17. Model FMCS
North American Board of Certified Energy Practitioners Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, Richard
The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
A construction worker on the deck of the mobile launcher welds a portion of a platform for installation of a vehicle support post at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Army Net Zero: Energy Roadmap and Program Summary, Fiscal Year 2013 (Brochure)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The U.S. Army (Army) partnered with the National Renewable Energy Laboratory (NREL) and the U.S. Army Corps of Engineers to assess opportunities for increasing energy security through improved energy efficiency and optimized renewable energy strategies at nine installations across the Army's portfolio. Referred to as Net Zero Energy Installations (NZEIs), these projects demonstrate and validate energy efficiency and renewable energy technologies with approaches that can be replicated across DOD and other Federal agencies, setting the stage for broad market adoption. This report summarizes the results of the energy project roadmaps developed by NREL, shows the progress each installation could makemore » in achieving Net Zero Energy by 2020, and presents lessons learned and unique challenges from each installation.« less
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Several heavy lift cranes surround the mobile launcher at NASA's Kennedy Space Center in Florida. Preparations are underway to lift a vehicle support post up and onto the mobile launcher for installation on the deck. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
2016-11-10
A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-10-19
A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
NASA Procurement Career Development Program
NASA Technical Reports Server (NTRS)
1987-01-01
The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.
Extended Plate and Beam Wall System: Concept Investigation and Initial Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiehagen, J.; Kochkin, V.
A new and innovative High-R wall design, referred to as the Extended Plate & Beam (EP&B), is under development. The EP&B system uniquely integrates foam sheathing insulation with wall framing such that wood structural panels are installed exterior of the foam sheathing, enabling the use of standard practices for installation of drainage plane, windows and doors, claddings, cavity insulation, and the standard exterior foam sheathing installation approach prone to damage of the foam during transportation of prefabricated wall panels. As part of the ongoing work, the EP&B wall system concept has undergone structural verification testing and has been positively vettedmore » by a group of industry stakeholders. Having passed these initial milestone markers, the advanced wall system design has been analyzed to assess cost implications relative to other advanced wall systems, undergone design assessment to develop construction details, and has been evaluated to develop representative prescriptive requirements for the building code. This report summarizes the assessment steps conducted to-date and provides details of the concept development.« less
Extended Plate and Beam Wall System: Concept Investigation and Initial Evaluation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiehagen, J.; Kochkin, V.
2015-08-01
A new and innovative High-R wall design, referred to as the Extended Plate & Beam (EP&B), is under development. The EP&B system uniquely integrates foam sheathing insulation with wall framing such that wood structural panels are installed exterior of the foam sheathing, enabling the use of standard practices for installation of drainage plane, windows and doors, claddings, cavity insulation, and the standard exterior foam sheathing installation approach prone to damage of the foam during transportation of prefabricated wall panels. As part of the ongoing work, the EP&B wall system concept has undergone structural verification testing and has been positively vettedmore » by a group of industry stakeholders. Having passed these initial milestone markers, the advanced wall system design has been analyzed to assess cost implications relative to other advanced wall systems, undergone design assessment to develop construction details, and has been evaluated to develop representative prescriptive requirements for the building code. This report summarizes the assessment steps conducted to-date and provides details of the concept development.« less
Fitting modular reconnaissance systems into modern high-performance aircraft
NASA Astrophysics Data System (ADS)
Stroot, Jacquelyn R.; Pingel, Leslie L.
1990-11-01
The installation of the Advanced Tactical Air Reconnaissance System (ATARS) in the F/A-18D(RC) presented a complex set of design challenges. At the time of the F/A-18D(RC) ATARS option exercise, the design and development of the ATARS subsystems and the parameters of the F/A-18D(RC) were essentially fixed. ATARS is to be installed in the gun bay of the F/A-18D(RC), taking up no additional room, nor adding any more weight than what was removed. The F/A-18D(RC) installation solution required innovations in mounting, cooling, and fit techniques, which made constant trade study essential. The successful installation in the F/A-18D(RC) is the result of coupling fundamental design engineering with brainstorming and nonstandard approaches to every situation. ATARS is sponsored by the Aeronautical Systems Division, Wright-Patterson AFB, Ohio. The F/A-18D(RC) installation is being funded to the Air Force by the Naval Air Systems Command, Washington, D.C.
Jenkins, P L; Sorensen, J A; Yoder, A; Myers, M; Murphy, D; Cook, G; Wright, F; Bayes, B; May, J J
2012-04-01
Tractor overturns contribute significantly to the number of work-related deaths that occur every year on U.S. farms. Although the agriculture, forestry, and fishing industries have the highest fatality rates of any industries, researchers predict that the elimination of tractor overturn fatalities could result in a noticeable reduction in the farm fatality rate. Rollover protection structures (ROPS) are 99% effective in preventing overturn fatalities. However, roughly 50% of U.S. tractors do not have a ROPS. In order to identify prominent barriers and motivators to installing ROPS, a phone survey was conducted with a random sample of farmers (n = 327) in Vermont and Pennsylvania, two states interested in developing ROPS installation programs. Results indicated that cost and perceived need were the most frequently highly rated barriers to ROPS installation in both states, while working near hills or ditches and concerns regarding liability were the most frequently highly rated motivators for installing ROPS. Additionally, older farmers identified limited use of a tractor as a highly rated barrier.
Kostyukevich, Yury; Efremov, Denis; Ionov, Vladimir; Kukaev, Eugene; Nikolaev, Eugene
2017-11-01
The detection of explosives and drugs in hard-to-reach places is a considerable challenge. We report the development and initial experimental characterization of the air analysis system that includes Field Asymmetric Ion Mobility Spectrometer, array of the semiconductor gas sensors and is installed on multicopter. The system was developed based on the commercially available DJI Matrix 100 platform. For data collection and communication with operator, the special compact computer (Intel Compute Stick) was installed onboard. The total weight of the system was 3.3 kg. The system allows the 15-minute flight and provides the remote access to the obtained data. The developed system can be effectively used for the detection of impurities in the air, ecology monitoring, detection of chemical warfare agents, and explosives, what is especially important in light of recent terroristic attacks. The capabilities of the system were tested on the several explosives such as trinitrotoluene and nitro powder. Copyright © 2017 John Wiley & Sons, Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirby, M.J.; Kramer, S.R.; Pittard, G.T.
Jason Consultants International, Inc., under the sponsorship of the Gas Research Institute (GRI), has developed guidelines, procedures and software, which are described in this paper, for the installation of polyethylene gas pipe using guided horizontal drilling. Jason was aided in this development by two key subcontractors; Maurer Engineering who wrote the software and NICOR Technologies who reviewed the software and guidelines from a utility perspective. This program resulted in the development of commerically viable software for utilities, contractors, engineering firms, and others involved with the installation of pipes using guided horizontal drilling. The software is an interactive design tool thatmore » allows the user to enter ground elevation data, alignment information and pipe data. The software aides the engineer in designing a drill path and provides plan and profile views along with tabular data for pipe depth and surface profile. Finally, the software calculates installation loads and pipe stresses, compares these values against pipe manufacturer`s recommendations, and provides this information graphically and in tabular form. 5 refs., 18 figs., 2 tabs.« less
Rock deformation equations and application to the study on slantingly installed disc cutter
NASA Astrophysics Data System (ADS)
Zhang, Zhao-Huang; Meng, Liang; Sun, Fei
2014-08-01
At present the mechanical model of the interaction between a disc cutter and rock mainly concerns indentation experiment, linear cutting experiment and tunnel boring machine (TBM) on-site data. This is not in line with the actual rock-breaking movement of the disc cutter and impedes to some extent the research on the rock-breaking mechanism, wear mechanism and design theory. Therefore, our study focuses on the interaction between the slantingly installed disc cutter and rock, developing a model in accordance with the actual rock-breaking movement. Displacement equations are established through an analysis of the velocity vector at the rock-breaking point of the disc cutter blade; the functional relationship between the displacement parameters at the rock-breaking point and its rectangular coordinates is established through an analysis of micro-displacement vectors at the rock-breaking point, thus leading to the geometric equations of rock deformation caused by the slantingly installed disc cutter. Considering the basically linear relationship between the cutting force of disc cutters and the rock deformation before and after the leap break of rock, we express the constitutive relations of rock deformation as generalized Hooke's law and analyze the effect of the slanting installation angle of disc cutters on the rock-breaking force. This will, as we hope, make groundbreaking contributions to the development of the design theory and installation practice of TBM.
Project SAGE: solar assisted gas energy. Final report and executive summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less
Design and installation of 3 photovoltaic village power systems in Tunisia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Darkazalli, G.; Rangaraian, A.; Scudder, L.
1982-09-01
A joint program sponsored by the United States Agency for International Development (U.S.A.I.D.) and the government of Tunisia was initiated to study the feasibility of using photovoltaics to supply electricity to remote villages in Tunisia. U.S.A.I.D. selected the NASA Lewis Research Center to implement the installation of three photovoltaic systems in the Tunisian village of Hammam Biadha Sud. In a competitive procurement, NASA selected a team proposed by the Solar Power Corporation, TriSolar Corporation, Esso Standard Tunisie and Development Sciences, Inc. to design and install the systems and train the villagers in the use of photovoltaics. The Tunisian Government counterpartmore » to NASA, is STEG, the Tunisian electrical generation authority. An overview of the systems designs is presented in this paper.« less
Residential photovoltaic module and array requirements study
NASA Technical Reports Server (NTRS)
Nearhoof, S. L.; Oster, J. R.
1979-01-01
Design requirements for photovoltaic modules and arrays used in residential applications were identified. Building codes and referenced standards were reviewed for their applicability to residential photovoltaic array installations. Four installation types were identified - integral (replaces roofing), direct (mounted on top of roofing), stand-off (mounted away from roofing), and rack (for flat or low slope roofs, or ground mounted). Installation costs were developed for these mounting types as a function of panel/module size. Studies were performed to identify optimum module shapes and sizes and operating voltage cost drivers. It is concluded that there are no perceived major obstacles to the use of photovoltaic modules in residential arrays. However, there is no applicable building code category for residential photovoltaic modules and arrays and additional work with standards writing organizations is needed to develop residential module and array requirements.
NASA Astrophysics Data System (ADS)
Amate, Juan; Sánchez, Gustavo D.; González, Gonzalo
2016-09-01
One of the biggest challenges to introduce Tension Leg Platform (TLP) technology into the Offshore Wind market are the Transport & Installation (T&I) stages, since most of TLPs are not self-stable as semisubmersible or SPAR platforms, and consequently requires additional means to perform these operations. This paper addresses this problem that has been overcome through the development of a Semi-submersible “Transport & Installation” Barge (SSB) for Iberdrola's TLPWIND® floating support structure. The Semi-submersible Barge has been designed both through the use of numerical models and an extensive basin testing campaign carried out at the University of Strathclyde facilities. This paper also includes an estimation of the duration in time to carry out the installation process of a Floating Offshore Wind Farm, comprising 100x5MW TLPWIND® units in different scenarios.
ERIC Educational Resources Information Center
Mahajan, Bal M.; Beine, William B.
The objectives of this research effort were 1) to develop a methodology for assessing the impact attenuation performance of surfaces in relation to head injury, and 2) to test surfaces commonly installed under playground equipment to determine which surfacing materials, if any, are capable of providing protection against head injury that might…
Environmental Assessment: Installation Development at Lackland Air Force Base, Texas
2006-12-01
37 TRW 37th Training Wing MCF/day thousand cubic feet per day AAM Annual Arithmetic Mean mgd million gallons per day AAQS ambient air quality...Industrial Hygiene Association NAAQS National Ambient Air Quality Standards AICUZ Air Installation Compatible Use Zone NEPA National Environmental...AFB....................................... 3-33 Table 3-8 Federal Ambient Air Quality Standards
Mishelevich, David J.; Hudson, Betty G.; Van Slyke, Donald; Mize, Elaine I.; Robinson, Anna L.; Brieden, Helen C.; Atkinson, Jack; Robertson, James
1980-01-01
The installation of major components of a comprehensive Hospital Information System (HIS) called POIS, the Parkland On-line Information System, including identified success factors is described for the Dallas County Hospital District (DCHD) known also as the Parkland Memorial Hospital. Installation of the on-line IBM Health Care Support (HCS) Registration and Admissions Packages occurred in 1976 and implementation of the HCS Patient Care System (PCS) began in 1977 which includes on-line support of health care areas such as nursing stations and ancillary areas. The Duke Hospital Information System (DHIS) is marketed as the IBM HCS/Patient Care System (PCS). DCHD was the validation site. POIS has order entry, result reporting and work management components. While most of the patient care components are currently installed for the inpatient service, the Laboratories are being installed for the outpatient and Emergency areas as well. The Clinic Appointment System developed at the University of Michigan is also installed. The HCS family of programs use DL/1 and CICS and were installed in the OS versions, currently running under MVS on an IBM 370/168 Model 3 with 8 megabytes of main memory. ImagesFigure 1-AFigure 1-B
NASA Astrophysics Data System (ADS)
Rimov, A. A.; Chukanova, T. I.; Trofimov, Yu. V.
2016-12-01
Data on the comparative analysis variants of the quality of power installations (benchmarking) applied in the power industry is systematized. It is shown that the most efficient variant of implementation of the benchmarking technique is the analysis of statistical distributions of the indicators in the composed homogenous group of the uniform power installations. The benchmarking technique aimed at revealing the available reserves on improvement of the reliability and heat efficiency indicators of the power installations of the thermal power plants is developed in the furtherance of this approach. The technique provides a possibility of reliable comparison of the quality of the power installations in their homogenous group limited by the number and adoption of the adequate decision on improving some or other technical characteristics of this power installation. The technique provides structuring of the list of the comparison indicators and internal factors affecting them represented according to the requirements of the sectoral standards and taking into account the price formation characteristics in the Russian power industry. The mentioned structuring ensures traceability of the reasons of deviation of the internal influencing factors from the specified values. The starting point for further detail analysis of the delay of the certain power installation indicators from the best practice expressed in the specific money equivalent is positioning of this power installation on distribution of the key indicator being a convolution of the comparison indicators. The distribution of the key indicator is simulated by the Monte-Carlo method after receiving the actual distributions of the comparison indicators: specific lost profit due to the short supply of electric energy and short delivery of power, specific cost of losses due to the nonoptimal expenditures for repairs, and specific cost of excess fuel equivalent consumption. The quality loss indicators are developed facilitating the analysis of the benchmarking results permitting to represent the quality loss of this power installation in the form of the difference between the actual value of the key indicator or comparison indicator and the best quartile of the existing distribution. The uncertainty of the obtained values of the quality loss indicators was evaluated by transforming the standard uncertainties of the input values into the expanded uncertainties of the output values with the confidence level of 95%. The efficiency of the technique is demonstrated in terms of benchmarking of the main thermal and mechanical equipment of the extraction power-generating units T-250 and power installations of the thermal power plants with the main steam pressure 130 atm.
Klipin, M; Mare, I; Hazelhurst, S; Kramer, B
2014-01-01
Clinical and research data are essential for patient care, research and healthcare system planning. REDCapTM is a web-based tool for research data curatorship developed at Vanderbilt University in Nashville, USA. The Faculty of Health Sciences at the University of the Witwatersrand, Johannesburg South Africa identified the need for a cost effective data management instrument. REDCap was installed as per the user agreement with Vanderbilt University in August 2012. In order to assist other institutions that may lack the in-house Information Technology capacity, this paper describes the installation and support of REDCap and incorporates an analysis of user uptake over the first year of use. We reviewed the staffing requirements, costs of installation, process of installation and necessary infrastructure and end-user requests following the introduction of REDCap at Wits. The University Legal Office and Human Research Ethics Committee were consulted regarding the REDCap end-user agreement. Bi-monthly user meetings resulted in a training workshop in August 2013. We compared our REDCap software user numbers and records before and after the first training workshop. Human resources were recruited from existing staff. Installation costs were limited to servers and security certificates. The total costs to provide a functional REDCap platform was less than $9000. Eighty-one (81) users were registered in the first year. After the first training workshop the user numbers increased by 59 in one month and the total number of active users to 140 by the end of August 2013. Custom software applications for REDCap were created by collaboration between clinicians and software developers. REDCap was installed and maintained at limited cost. A small number of people with defined skills can support multiple REDCap users in two to four hours a week. End user training increased in the number of users, number of projects created and the number of projects moved to production.
Truss-Integrated Thermoformed Ductwork Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steven Winter; Dianne Griffiths; Ravi Gorthala
2007-08-30
This report summarizes a multi-year research effort to develop a leak-free duct system that can be readily installed within the thermal envelope. There are numerous efforts underway to improve duct system efficiency. Most of these involve modifications to current technology such as air sealing techniques like mastic and aeroseal, snap together duct connections, and greater levels of insulation. This project sought to make a more significant stride forward by introducing a duct system of a material that can be more readily sealed and can exhibit lower friction losses. The research focused on the use of smooth internal surface, low frictionmore » plastic ducts that could be easily installed with very low air leakage. The initial system concept that was proposed and researched in Phase I focused on the use of thermoformed plastic ducts installed in a recessed roof truss underneath the attic insulation. A bench top thermoformed system was developed and tested during Phase I of the project. In Phase II, a first generation duct system utilizing a resin impregnated fiberglass duct product was designed and specified. The system was installed and tested in an Atlanta area home. Following this installation research and correspondence with code officials was undertaken to alleviate the continued concern over the code acceptance of plastic ducts in above ground applications. A Committee Interpretation response was received from the International Code Council (ICC) stating that plastic ducts were allowed, but must be manufactured from materials complying with Class 0 or Class 1 rating. With assurance of code acceptance, a plastic duct system using rotomolded high density polyethylene ducts that had passed the material test requirements by impregnating the material with a fire retardant during the molding process was installed in the basement of a new ranch-style home in Madison, WI. A series of measurements to evaluate the performance benefits relative to a similar control house with a standard sheet metal installation were made.« less
The Process of Installing REDCap, a Web Based Database Supporting Biomedical Research
Mare, I.; Hazelhurst, S.; Kramer, B.
2014-01-01
Summary Background Clinical and research data are essential for patient care, research and healthcare system planning. REDCapTM is a web-based tool for research data curatorship developed at Vanderbilt University in Nashville, USA. The Faculty of Health Sciences at the University of the Witwatersrand, Johannesburg South Africa identified the need for a cost effective data management instrument. REDCap was installed as per the user agreement with Vanderbilt University in August 2012. Objectives In order to assist other institutions that may lack the in-house Information Technology capacity, this paper describes the installation and support of REDCap and incorporates an analysis of user uptake over the first year of use. Methods We reviewed the staffing requirements, costs of installation, process of installation and necessary infrastructure and end-user requests following the introduction of REDCap at Wits. The University Legal Office and Human Research Ethics Committee were consulted regarding the REDCap end-user agreement. Bi-monthly user meetings resulted in a training workshop in August 2013. We compared our REDCap software user numbers and records before and after the first training workshop. Results Human resources were recruited from existing staff. Installation costs were limited to servers and security certificates. The total costs to provide a functional REDCap platform was less than $9000. Eighty-one (81) users were registered in the first year. After the first training workshop the user numbers increased by 59 in one month and the total number of active users to 140 by the end of August 2013. Custom software applications for REDCap were created by collaboration between clinicians and software developers. Conclusion REDCap was installed and maintained at limited cost. A small number of people with defined skills can support multiple REDCap users in two to four hours a week. End user training increased in the number of users, number of projects created and the number of projects moved to production. PMID:25589907
Improving Energy Security for Air Force Installations
NASA Astrophysics Data System (ADS)
Schill, David
Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.
The Land-Use Efficiency of Big Solar
NASA Astrophysics Data System (ADS)
Hernandez, R. R.; Hoffacker, M.; Field, C. B.
2013-12-01
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy, however, the land-use efficiency (LUE; Wm-2) of USSE remains unknown. We quantified the nominal LUE of 183 USSE installations (> 20 megawatts; planned, under construction, and operating) using California as a case study. In California, we found that USSE installations are concentrated in the Central Valley and desert interior of southern California and have a LUE of 35.01 Wm-2. The installations comprise approximately 86,000 hectares (ha) and more land is allocated for photovoltaic schemes (72,294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.83 Wm-2) than installations on public land (25.42 Wm-2). We show how LUE can be improved and how co-benefit opportunities can be integrated with USSE enterprises to maximize their economic, energetic, and environmental returns on investment. (Left) The distribution of utility-scale solar energy installations in California (constructed and in progress) by technology type: concentrating solar power and photovoltaic with county lines shown. (Right) The distribution of utility-scale solar energy installations in California (constructed and in progress) by location: public or privately owned land. Larger capacity installations (megawatts) have relatively greater point size.
NASA Astrophysics Data System (ADS)
Rijal, Santosh
Various military training activities are conducted in more than 11.3 million hectares of land (> 5,500 training sites) in the United States (U.S.). These training activities directly and indirectly degrade the land. Land degradation can impede continuous military training. In order to sustain long term training missions and Army combat readiness, the environmental conditions of the military installations need to be carefully monitored and assessed. Furthermore, the National Environmental Policy Act of 1969 (NEPA) and the U.S. Army Regulation 200-2 require the DoD to minimize the environmental impacts of training and document the environmental consequences of their actions. To achieve these objectives, the Department of Army initiated an Integrated Training Area Management (ITAM) program to manage training lands through assessing their environmental requirements and establishing policies and procedures to achieve optimum, sustainable use of training lands. One of the programs under ITAM, Range and Training Land Assessment (RTLA) was established to collect field-based data for monitoring installation's environmental condition. Due to high cost and inefficiencies involved in the collection of field data, the RTLA program was stopped in several military installations. Therefore, there has been a strong need to develop an efficient and low cost remote sensing based methodology for assessing and monitoring land conditions of military installations. It is also important to make a long-term assessment of installation land condition for understanding cumulative impacts of continuous military training activities. Additionally, it is unclear that compared to non-military land condition, to what extent military training activities have led to the degradation of land condition for military installations. The first paper of this dissertation developed a soil erosion relevant and image derived cover factor (ICF) based on linear spectral mixture (LSM) analysis to assess and monitor the land condition of military land and compare it with non-military land. The results from this study can provide FR land managers with the information of the spatial variation and temporal trend of land condition in FR. Fort Riley land managers can also use this method for monitoring their land condition at a very low cost. This method can thus be applied to other military installations as well as non-military lands. Furthermore, one of the most significant environmental problems in military installations of the U.S. is the formation of gullies due to the intensive use of military vehicle. However, to our knowledge, no remote sensing based method has been developed and used to assess the detection of gullies in military installations. In the second paper of this dissertation, light detection and ranging (LiDAR) derived digital elevation model (DEM) of 2010 and WorldView-2 images of 2010 were used to quantify the gullies in FR. This method can be easily applied to assess gullies in non-military installations. On the other hand, modeling the land condition of military installation is critical to understand the spatial and temporal pattern of military training induced disturbance and land recovery. In the third paper, it was assumed that the military training induced disturbance was spatially auto-correlated and thus four regression models including i) linear stepwise regression (LSR) ii) logistic regression (LR), iii) geographically weighted linear regression (GWR), and iv) geographically weighted logistic regression (GWLR) were developed and compared using remote sensing image derived spectral variables for years 1990, 1997, 1998, 1999, and 2001. It was found that the spatial distribution of the military training disturbance was well demonstrated by all the regression models with higher intensities of military training disturbance in the northwest and central west parts of the installation. Compared to other regression models, GWR accurately estimated the land condition of FR. This result provided the applicability of using local variability based regression model to accurately predict land condition. Different plant communities of military installations respond differently to military training induced disturbance. The information of the spatial distribution of plant species in military installations is important to gain insight of the resilient capacity of the land following disturbances. For the purpose, in the fourth paper, hyperspectral in-situ data were collected from FR and KPBS in the summer of 2015 using a hyperspectral instrument. Principal component analysis (PCA) and band relative importance (BRI) were used to identify relative importance of each of the spectral bands. The results from this study provided useful information about the optimal wavelengths that help distinguish different plant species of FR and can be easily used with high resolution hyperspectral images for mapping the spatial distribution of the plant species. This information will be helpful for the sustainable management of the tallgrass prairie ecosystem. (Abstract shortened by ProQuest.).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pallesen, T.R.; Braestrup, M.W.; Jorgensen, O.
Development of Danish North Sea hydrocarbon resources includes the 17-km Rolf pipeline installed in 1985. This one consists of an insulated 8-in. two-phase flow product line with a 3-in. piggyback gas lift line. A practical solution to design of this insulated pipeline, including the small diameter, piggyback injection line was corrosion coating of fusion bonded epoxy (FBE) and polyethylene (PE) sleeve pipe. The insulation design prevents hydrate formation under the most conservative flow regime during gas lift production. Also, the required minimum flow rate during the initial natural lift period is well below the value anticipiated at the initiation ofmore » gas lift. The weight coating design ensures stability on the seabed during the summer months only; thus trenching was required during the same installation season. Installation of insulated flowlines serving marginal fields is a significant feature of North Sea hydrocarbon development projects. The Skjold field is connected to Gorm by a 6-in., two-phase-flow line. The 11-km line was installed in 1982 as the first insulated pipeline in the North Sea. The Rolf field, located 17 km west of Gorm, went on stream Jan. 2. The development includes an unmanned wellhead platform and an insulated, two-phase-flow pipeline to the Gorm E riser platform. After separation on the Gorm C process platform, the oil and condensate are transported to shore through the 20-in. oil pipeline, and the natural gas is piped to Tyra for transmission through the 30-in. gas pipeline. Oil production at Rolf is assisted by the injection of lift gas, transported from Gorm through a 3-in. pipeline, installed piggyback on the insulated 8-in. product line. The seabed is smooth and sandy, the water depth varying between 33.7 m (110.5 ft) at Rolf and 39.1 m (128 ft) at Gorm.« less
Development of TPS flight test and operational instrumentation
NASA Technical Reports Server (NTRS)
Carnahan, K. R.; Hartman, G. J.; Neuner, G. J.
1975-01-01
Thermal and flow sensor instrumentation was developed for use as an integral part of the space shuttle orbiter reusable thermal protection system. The effort was performed in three tasks: a study to determine the optimum instruments and instrument installations for the space shuttle orbiter RSI and RCC TPS; tests and/or analysis to determine the instrument installations to minimize measurement errors; and analysis using data from the test program for comparison to analytical methods. A detailed review of existing state of the art instrumentation in industry was performed to determine the baseline for the departure of the research effort. From this information, detailed criteria for thermal protection system instrumentation were developed.
Scientific publishing in non industrialized countries: a pilot wireless internet project for Africa.
Azzi, Angelo
2005-01-01
There is general agreement that the internet is the major means of future scientific communication and education. However not everybody appreciates that the development of electronic communication in industrialized societies is not matched, even to a small extent, in developing countries. Several new technologies offer the potential for developing countries to provide connectivity. Terrestrial wireless and satellite technologies offer many advantages in that they do not require installation of wire-line networks. Satellite facilities can also be installed where communication is needed, even in remote and isolated areas, rather than waiting for terrestrial networks to be extended from the cities.
NASA Technical Reports Server (NTRS)
Kaszeta, William J.
1987-01-01
Five different types of public service photovoltaic power/load systems installed in the Gabonese Republic are discussed. The village settings, the systems, performance results and some problems encountered are described. Most of the systems performed well, but some of the systems had problems due to failure of components or installation errors. The project was reasonably successful in collecting and reporting data for system performance evaluation that will be useful for guiding officials and system designers involved in village power applications in developing countries.
ERIC Educational Resources Information Center
MALEY, DONALD
THIS COURSE OUTLINE ON ELECTROMECHANICAL INSTALLATION AND REPAIR IS PART OF THE FINAL REPORT ON "CLUSTER CONCEPT" COURSES IN VOCATIONAL EDUCATION FOR SECONDARY EDUCATION (ED 010 301). EACH JOB ENTRY TASK WAS ANALYZED FOR HUMAN REQUIREMENTS (COMMUNICATION, MEASUREMENT, MATHEMATICS, SCIENCE, SKILLS, AND INFORMATION) NECESSARY TO…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Couch, R.W.; Deacon, R.J.
1973-09-30
This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.
Development of an Onboard Strain Recorder
1990-01-01
Investigations ...................... .910 2-3 Strain Sensors of Previous Investigations ..................... 11 2-4 Signal Conditioning of Previous...the time the strain sensor is installed or calibrated. If a maximum stress or force is to be determined, careful structural analysis is required to...such as deckhouse edges have been instrumented as cracks appear. Extreme care concerning placement and orientation of sensor installation is required
Code of Federal Regulations, 2011 CFR
2011-01-01
... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...
Code of Federal Regulations, 2012 CFR
2012-01-01
... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...
Code of Federal Regulations, 2013 CFR
2013-01-01
... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...
Code of Federal Regulations, 2014 CFR
2014-01-01
... concrete, usually reinforced, poured over gravel and a vapor barrier with perimeter insulation to prevent heat loss. 4. Subflooring 0 1 1 The installation of materials used for flooring that is laid directly..., and before the insulation is placed in the walls and ceiling. 14. Insulation 2 2 2 The installation of...
Simplified installation of thrust bearings
NASA Technical Reports Server (NTRS)
Sensenbaugh, N. D.
1980-01-01
Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.
ERIC Educational Resources Information Center
Scriven, Jolene D.; And Others
A study was conducted (1) to determine current practices in word processing installations in selected organizations throughout the United States, and (2) to ascertain anticipated future developments in word processing as well as to provide recommendations for educational institutions that prepare workers for business offices. Seven interview…
Middlesex Community College Geothermal Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klein, Jessie; Spaziani, Gina
The purpose of the project was to install a geothermal system in the trustees house on the Bedford campus of Middlesex Community College. In partnership with the environmental science faculty, learning activities for environmental science courses were developed to explain geothermal energy and more specifically the newly installed system to Middlesex students. A real-time monitoring system highlights the energy use and generation.
Pressure drop in tubing in aircraft instrument installations
NASA Technical Reports Server (NTRS)
Wildhack, W A
1937-01-01
The theoretical basis of calculation of pressure drop in tubing is reviewed briefly. The effect of pressure drop in connecting tubing upon the operation and indication of aircraft instruments is discussed. Approximate equations are developed, and charts and tables based upon them are presented for use in designing installations of altimeters, air-speed indicators, rate-of-climb indicators, and air-driven gyroscopic instruments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kobos, Peter Holmes; Malczynski, Leonard A.; Walker, La Tonya Nicole
People save for retirement throughout their career because it is virtually impossible to save all you’ll need in retirement the year before you retire. Similarly, without installing incremental amounts of clean fossil, renewable or transformative energy technologies throughout the coming decades, a radical and immediate change will be near impossible the year before a policy goal is set to be in place. This notion of steady installation growth over acute installations of technology to meet policy goals is the core topic of discussion for this research. This research operationalizes this notion by developing the theoretical underpinnings of regulatory and marketmore » acceptance delays by building upon the common Technology Readiness Level (TRL) framework and offers two new additions to the research community. The new and novel Regulatory Readiness Level (RRL) and Market Readiness Level (MRL) frameworks were developed. These components, collectively called the Technology, Regulatory and Market (TRM) readiness level framework allow one to build new constraints into existing Integrated Assessment Models (IAMs) to address research questions such as, ‘To meet our desired technical and policy goals, what are the factors that affect the rate we must install technology to achieve these goals in the coming decades?’« less
Experience of Developing Cloud Service for accounting Sales in installments
NASA Astrophysics Data System (ADS)
Barankov, V. V.; Barankova, I. I.; Mikhailova, U. V.; Kalugina, O. B.
2018-05-01
The paper presents the developed and implemented system of accounting sales in installments using tables as a cloud variant of Google services. The main system requirements and the special features of the program implementation such as the multi user data cleaning, the volume and speed of converting the tables, the mechanisms of conditional formatting of cells, the protection of cells and ranges and the data input check are provided. The paper also discusses the functionality of the system of accounting sales in installments, which is implemented by the formulae in the cells, the formulae in the extra options of Google tables and by programming in Google Apps Script, as a cloud variant of Java Script. The safety and security of the customers’ data, as well as staff members’ accountability and responsibility for the input of data in the system, are provided by a number of information security measures
Microcomputer network for control of a continuous mining machine. Information circular/1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schiffbauer, W.H.
1993-01-01
The paper details a microcomputer-based control and monitoring network that was developed in-house by the U.S. Bureau of Mines, and installed on a Joy 14 continuous mining machine. The network consists of microcomputers that are connected together via a single twisted pair cable. Each microcomputer was developed to provide a particular function in the control process. Machine-mounted microcomputers in conjunction with the appropriate sensors provide closed-loop control of the machine, navigation, and environmental monitoring. Off-the-machine microcomputers provide remote control of the machine, sensor status, and a connection to the network so that external computers can access network data and controlmore » the continuous mining machine. Although the network was installed on a Joy 14 continuous mining machine, its use extends beyond it. Its generic structure lends itself to installation onto most mining machine types.« less
2016-10-19
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coughlin, J.; Kandt, A.
This report focuses on financial options developed specifically for renewable energy and energy efficiency projects in three California public school districts. Solar energy systems installed on public schools have a number of benefits that include utility bill savings, reductions in greenhouse gas emissions (GHGs) and other toxic air contaminants, job creation, demonstrating environmental leadership, and creating learning opportunities for students. In the 2011 economic environment, the ability to generate general-fund savings as a result of reducing utility bills has become a primary motivator for school districts trying to cut costs. To achieve meaningful savings, the size of the photovoltaic (PV)more » systems installed (both individually on any one school and collectively across a district) becomes much more important; larger systems are required to have a material impact on savings. Larger PV systems require a significant financial commitment and financing therefore becomes a critical element in the transaction. In simple terms, school districts can use two primary types of ownership models to obtain solar installations and cost savings across a school district. The PV installations can be financed and owned directly by the districts themselves. Alternatively, there are financing structures whereby another entity, such as a solar developer or its investors, actually own and operate the PV systems on behalf of the school district. This is commonly referred to as the 'third-party ownership model.' Both methods have advantages and disadvantages that should be weighed carefully.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryngelson, R.H.
Describes installation of 3 satellite subsea trees in 500 ft of water from a semisubmersible drilling rig. These wet, diver-assist trees are part of Phillips Petroleum's early development and production program (EDPP) for the Espoir field offshore Ivory Coast, with plans calling for 5 satellite wells with downhole completion equipment and subsea production trees. Diagram shows how a converted jackup, Dan Duke, supports equipment to handle production from subsea wells. Table gives time breakdown of subsea tree installation. Before mobilizing the subsea trees, control system, and tubulars to the rig, a study of deck layout, payloads, and traffic patterns wasmore » performed. Concludes that, based on experience in this project and the cost differences between purchase and installation costs, final success is 90% dependent on informed and trained field personnel after engineering, design, and manufacturing; attention to installation procedures and training of field and operational personnel are as critical or more critical than design changes to equipment; and selection of a supplier for high technology equipment, based on a low bid alone, may not translate into lower installation costs.« less
Chen, Ching-Ho; Wu, Ray-Shyan; Liu, Wei-Lin; Su, Wen-Ray; Chang, Yu-Min
2009-01-01
Some countries, including Taiwan, have adopted strategic environmental assessment (SEA) to assess and modify proposed policies, plans, and programs (PPPs) in the planning phase for pursuing sustainable development. However, there were only some sketchy steps focusing on policy assessment in the system of Taiwan. This study aims to develop a methodology for SEA in Taiwan to enhance the effectiveness associated with PPPs. The proposed methodology comprises an SEA procedure involving PPP management and assessment in various phases, a sustainable assessment framework, and an SEA management system. The SEA procedure is devised based on the theoretical considerations by systems thinking and the regulative requirements in Taiwan. The positive and negative impacts on ecology, society, and economy are simultaneously considered in the planning (including policy generation and evaluation), implementation, and control phases of the procedure. This study used the analytic hierarchy process, Delphi technique, and systems analysis to develop a sustainable assessment framework. An SEA management system was built based on geographic information system software to process spatial, attribute, and satellite image data during the assessment procedure. The proposed methodology was applied in the SEA of golf course installation policy in 2001 as a case study, which was the first SEA in Taiwan. Most of the 82 existing golf courses in 2001 were installed on slope lands and caused a serious ecological impact. Assessment results indicated that 15 future golf courses installed on marginal lands (including buffer zones, remedied lands, and wastelands) were acceptable because the comprehensive environmental (ecological, social, and economic) assessment value was better based on environmental characteristics and management regulations of Taiwan. The SEA procedure in the planning phase for this policy was completed but the implementation phase of this policy was not begun because the related legislation procedure could not be arranged due to a few senators' resistance. A self-review of the control phase was carried out in 2006 using this methodology. Installation permits for 12 courses on slope lands were terminated after 2001 and then 27 future courses could be installed on marginal lands. The assessment value of this policy using the data on ecological, social, and economic conditions from 2006 was higher than that using the data from 2001. The analytical results illustrate that the proposed methodology can be used to effectively and efficiently assist the related authorities for SEA.
Sarkar, Archana; Dutta, Arup; Dhingra, Usha; Dhingra, Pratibha; Verma, Priti; Juyal, Rakesh; Black, Robert E; Menon, Venugopal P; Kumar, Jitendra; Sazawal, Sunil
2006-08-01
In settings in developing countries, children often socialize with multiple socializing agents (peers, siblings, neighbors) apart from their parents, and thus, a measurement of a child's social interactions should be expanded beyond parental interactions. Since the environment plays a role in shaping a child's development, the measurement of child-socializing agents' interactions is important. We developed and used a computerized observational software Behavior and Social Interaction Software (BASIS) with a preloaded coding scheme installed on a handheld Palm device to record complex observations of interactions between children and socializing agents. Using BASIS, social interaction assessments were conducted on 573 preschool children for 1 h in their natural settings. Multiple screens with a set of choices in each screen were designed that included the child's location, broad activity, state, and interactions with child-socializing agents. Data were downloaded onto a computer and systematically analyzed. BASIS, installed on Palm OS (M-125), enabled the recording of the complex interactions of child-socializing agents that could not be recorded with manual forms. Thus, this tool provides an innovative and relatively accurate method for the systematic recording of social interactions in an unrestricted environment.
Fully Automated Data Collection Using PAM and the Development of PAM/SPACE Reversible Cassettes
NASA Astrophysics Data System (ADS)
Hiraki, Masahiko; Watanabe, Shokei; Chavas, Leonard M. G.; Yamada, Yusuke; Matsugaki, Naohiro; Igarashi, Noriyuki; Wakatsuki, Soichi; Fujihashi, Masahiro; Miki, Kunio; Baba, Seiki; Ueno, Go; Yamamoto, Masaki; Suzuki, Mamoru; Nakagawa, Atsushi; Watanabe, Nobuhisa; Tanaka, Isao
2010-06-01
To remotely control and automatically collect data in high-throughput X-ray data collection experiments, the Structural Biology Research Center at the Photon Factory (PF) developed and installed sample exchange robots PAM (PF Automated Mounting system) at PF macromolecular crystallography beamlines; BL-5A, BL-17A, AR-NW12A and AR-NE3A. We developed and installed software that manages the flow of the automated X-ray experiments; sample exchanges, loop-centering and X-ray diffraction data collection. The fully automated data collection function has been available since February 2009. To identify sample cassettes, PAM employs a two-dimensional bar code reader. New beamlines, BL-1A at the Photon Factory and BL32XU at SPring-8, are currently under construction as part of Targeted Proteins Research Program (TPRP) by the Ministry of Education, Culture, Sports, Science and Technology of Japan. However, different robots, PAM and SPACE (SPring-8 Precise Automatic Cryo-sample Exchanger), will be installed at BL-1A and BL32XU, respectively. For the convenience of the users of both facilities, pins and cassettes for PAM and SPACE are developed as part of the TPRP.
Energy Storage System Safety: Plan Review and Inspection Checklist
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, Pam C.; Conover, David R.
Codes, standards, and regulations (CSR) governing the design, construction, installation, commissioning, and operation of the built environment are intended to protect the public health, safety, and welfare. While these documents change over time to address new technology and new safety challenges, there is generally some lag time between the introduction of a technology into the market and the time it is specifically covered in model codes and standards developed in the voluntary sector. After their development, there is also a timeframe of at least a year or two until the codes and standards are adopted. Until existing model codes andmore » standards are updated or new ones are developed and then adopted, one seeking to deploy energy storage technologies or needing to verify the safety of an installation may be challenged in trying to apply currently implemented CSRs to an energy storage system (ESS). The Energy Storage System Guide for Compliance with Safety Codes and Standards1 (CG), developed in June 2016, is intended to help address the acceptability of the design and construction of stationary ESSs, their component parts, and the siting, installation, commissioning, operations, maintenance, and repair/renovation of ESS within the built environment.« less
Land-use efficiency of big solar.
Hernandez, Rebecca R; Hoffacker, Madison K; Field, Christopher B
2014-01-21
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy; however, the land-use efficiency (LUE; Wm(-2)) of USSE remains ambiguous. We quantified the capacity-based LUE of 183 USSE installations (>20 MW; planned, under construction, and operating) using California as a case study. In California, USSE installations are concentrated in the Central Valley and interior regions of southern California and have a LUE of 35.0 Wm(-2). The installations occupy approximately 86,000 ha and more land is allocated for photovoltaic schemes (72 294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on capacity-based LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.8 Wm(-2)) than installations on public land (25.4 Wm(-2)). Our findings can be used to better understand and improve the LUE of USSE, thereby maximizing economic, energetic, and environmental returns on investments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yuan, S; Lu, WG; Chen, YP
2015-03-11
A unique strategy, sequential linker installation (SLI), has been developed to construct multivariate MOFs with functional groups precisely positioned. PCN-700, a Zr-MOF with eight-connected Zr6O4(OH)(8)(H2O)(4) clusters, has been judiciously designed; the Zr-6 clusters in this MOF are arranged in such a fashion that, by replacement of terminal OH-/H2O ligands, subsequent insertion of linear dicarboxylate linkers is achieved. We demonstrate that linkers with distinct lengths and functionalities can be sequentially installed into PCN-700. Single-crystal to single-crystal transformation is realized so that the positions of the subsequently installed linkers are pinpointed via single-crystal X-ray diffraction analyses. This methodology provides a powerful toolmore » to construct multivariate MOFs with precisely positioned functionalities in the desired proximity, which would otherwise be difficult to achieve.« less
Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burford, M.J.; Burnett, R.A.; Downing, T.R.
The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage.more » The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.« less
Installation of TVC Actuators in a Two Axis Inertial Load Simulator Test Stand
NASA Technical Reports Server (NTRS)
Dziubanek, Adam
2013-01-01
This paper is about the installation of Space Shuttle Main Engines (SSME) actuators in the new Two Axis Inertial Load Simulator (ILS) at MSFC. The new test stand will support the core stage of the Space Launch System (SLS). Because of the unique geometry of the new test stand standard actuator installation procedures will not work. I have been asked to develop a design on how to install the actuators into the new test stand. After speaking with the engineers and technicians I have created a possible design solution. Using Pro Engineer design software and running my own stress calculations I have proven my design is feasible. I have learned how to calculate the stresses my design will see from this task. From the calculations I have learned I have over built the apparatus. I have also expanded my knowledge of Pro Engineer and was able to create a model of my idea.
NASA Astrophysics Data System (ADS)
Rumyantsev, Valery D.; Ashcheulov, Yury V.; Chekalin, Alexander V.; Chumakov, Yury S.; Shvarts, Maxim Z.; Timofeev, Vladimir V.
2014-09-01
As a rule, the HCPV modules are mounted on solar trackers in a form of a flat panel. Wind pressure is one of the key factors limiting the operation capabilities of such type solar installations. At the PV Lab of the Ioffe Institute, the sun-trackers with step-like frame for modules have been proposed and developed, which have a potential for significant reduction of wind pressure. Such a reduction is realized in a wide range of the frame tilt angles the most typical for day-light operation of solar installations. In the present work, theoretical consideration and indoor experiments with mechanical models of installation frames have been carried out. A wind tunnel has been used as an experimental instrument for quantitative comparison in conventional units of expected wind loads on module frames of different designs.
Comparison of Cryogenic Temperature Sensor Installation Inside or Outside the Piping
NASA Astrophysics Data System (ADS)
Müller, R.; Süßer, M.
2010-04-01
Cryogenic thermometers for large cryogenic facilities, like superconducting particle accelerator or fusion devices, must be able to withstand very severe conditions over the lifetime of the facility. In addition to the proper selection of the sensor, the choice of the appropriate installation method plays an important role for satisfying operation. Several characteristics must be taken into account, for instance: large numbers of sensors, different claims of accuracy, qualified preparation methods and at least qualified attachment of the sensor holder on the piping. One remedy to get satisfying results is the development of simple thermometer mounting fixtures, because thermometer mounting often may be realized by personnel with limited experience. This contribution presents two different methods for sensor installations, namely inside or outside installation on the piping. These have been the standard applications in the superconducting coil test facility TOSKA for many years. The characteristics of each of these methods will be discussed and compared.
Survey of Noncommissioned Officer Academies for Criterion Development Purposes,
1961-12-01
Inspection, Fitting and Wearing of the Uniform, Ceremonies, Customs and Courtesies, Conduct of Physical Training Program, etc. )--minimum of 15 hours. 3...in a course and covers the general responsibilities of leadership, problems of leader- subordinate relationships , and some of the leader’s specific...OPERATION AT INSTALLATIONS SURVEYED 3Y DA MILITARY PERSONNEL MANAGMNT TEAMS Type of Training Program Installation Refresher Leadership Instructor
2017-02-01
Image Processing Web Server Administration ...........................17 Fig. 18 Microsoft ASP.NET MVC 4 installation...algorithms are made into client applications that can be accessed from an image processing web service2 developed following Representational State...Transfer (REST) standards by a mobile app, laptop PC, and other devices. Similarly, weather tweets can be accessed via the Weather Digest Web Service
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE FUNCTION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM AND THE PROCEDURES FOR TRANSMISSION INSTALLATION. TOPICS ARE (1) IMPORTANCE OF THE COOLING SYSTEM, (2) COOLING SYSTEM COMPONENTS, (3) EVALUATING COOLING SYSTEM FAILURES, (4) CARING FOR THE COOLING SYSTEM,…
Design Methodology for Automated Construction Machines
1987-12-11
along with the design of a pair of machines which automate framework installation.-,, 20. DISTRIBUTION IAVAILABILITY OF ABSTRACT 21. ABSTRACT SECURITY... Development Assistant Professor of Civil Engineering and Laura A . Demsetz, David H. Levy, Bruce Schena Graduate Research Assistants December 11, 1987 U.S...are discussed along with the design of a pair of machines which automate framework installation. Preliminary analysis and testing indicate that these
Code of Federal Regulations, 2011 CFR
2011-07-01
... this section. (1) Install the flow sensor and other necessary equipment in a position that provides a representative flow. (2) Use a flow sensor with a measurement sensitivity of no greater than 2 percent of the...) Install the pressure sensor(s) in a position that provides a representative measurement of the pressure (e...
ERIC Educational Resources Information Center
Scriven, Jolene D.; And Others
A study sought to determine current practices in word processing installations located in selected organizations throughout the United States. A related problem was to ascertain anticipated future developments in word processing to provide information for educational institutions preparing workers for the business office. Six interview instruments…
Charles A. Harrison; Susan O’Ney
2002-01-01
We developed procedures for installing prefabricated trapezoidal flumes in deep (10 to 12 feet) drainage ditches to monitor hydrologic functions and provide gauge locations for sampling discharge. Flows from the instrumented basins were generally low, but the ditches were occasionally subject to high flows caused by rain events of 2 to 3 inches or more. These high flow...
Guidelines for Installation Natural Resource Protection during Training.
1981-10-01
continental United States. Educational material was then developed which adapted the basic concept to differing installation terrain, vegetation , and climates...but absolutely forbidden for most of the year in others. The terrain and vegetation shown in the artwork accompanying each section may also have to...regions reflecting variations in vegetation , climate, and ecology in the continental United States: (1) Northeast, (2) Southeast, (3) Upper Midwest, (4
Prygun, A V; Lazarev, N V
1998-10-01
Radiation measuring on the work places of operators in command and control installations proved that environment parameters depending on electronic display functioning are in line with the regulations' requirements. Nevertheless the operator health estimates show that the problem of personnel security still exists. The authors recommend some measures to improve the situation.
Successfully Implementing Net-Zero Energy Policy through the Air Force Military Construction Program
2013-03-01
Meets Does not meet Does not meet Meets Renewable Farms Meets Meets Meets Meets On-Site (Distributed Generation) Meets* Meets* Meets Meets...independence, nor does it allow for net-zero energy installations. Developing centralized renewable energy farms is another method for obtaining...combination of centralized renewable energy farms and distributed generation methods. The specific combination of methods an installation will utilize
Installation and Testing of ITER Integrated Modeling and Analysis Suite (IMAS) on DIII-D
NASA Astrophysics Data System (ADS)
Lao, L.; Kostuk, M.; Meneghini, O.; Smith, S.; Staebler, G.; Kalling, R.; Pinches, S.
2017-10-01
A critical objective of the ITER Integrated Modeling Program is the development of IMAS to support ITER plasma operation and research activities. An IMAS framework has been established based on the earlier work carried out within the EU. It consists of a physics data model and a workflow engine. The data model is capable of representing both simulation and experimental data and is applicable to ITER and other devices. IMAS has been successfully installed on a local DIII-D server using a flexible installer capable of managing the core data access tools (Access Layer and Data Dictionary) and optionally the Kepler workflow engine and coupling tools. A general adaptor for OMFIT (a workflow engine) is being built for adaptation of any analysis code to IMAS using a new IMAS universal access layer (UAL) interface developed from an existing OMFIT EU Integrated Tokamak Modeling UAL. Ongoing work includes development of a general adaptor for EFIT and TGLF based on this new UAL that can be readily extended for other physics codes within OMFIT. Work supported by US DOE under DE-FC02-04ER54698.
Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan
2015-01-01
This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.
The design and development of a rectangular, shingle-type photovoltaic module
NASA Astrophysics Data System (ADS)
Shepard, N. F., Jr.
A shingle-type photovoltaic module has been designed and developed to meet the requirements of specifications for residential applications. The module is ideally suited for installation directly to the sheathing of a sloping, south-facing roof of a residential, industrial, or commercial building. The design requirements are examined, taking into account also module safety requirements. Aspects of module design and analysis are discussed, giving attention to installation details, solar cells and electrical circuit design, the encapsulation system, substrate lamination, and the module-to-module interconnecting cable. Details of module assembly experience and test and outdoor exposure experience are also considered.
The design and development of a rectangular, shingle-type photovoltaic module
NASA Technical Reports Server (NTRS)
Shepard, N. F., Jr.
1982-01-01
A shingle-type photovoltaic module has been designed and developed to meet the requirements of specifications for residential applications. The module is ideally suited for installation directly to the sheathing of a sloping, south-facing roof of a residential, industrial, or commercial building. The design requirements are examined, taking into account also module safety requirements. Aspects of module design and analysis are discussed, giving attention to installation details, solar cells and electrical circuit design, the encapsulation system, substrate lamination, and the module-to-module interconnecting cable. Details of module assembly experience and test and outdoor exposure experience are also considered.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Easton, C. R.
The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less
Promotion of renewable energy in some MENA region countries
NASA Astrophysics Data System (ADS)
Abdeladim, K.; Bouchakour, S.; Arab, A. Hadj; Ould Amrouche, S.; Yassaa, N.
2018-05-01
In recent years Middle East and North African (MENA) countries, are showing efforts about the integration of renewable electricity into their power markets. Indeed, installations were already achieved and renewable energy programs were launched. The Algerian program remains one of the most ambitious with its installation capacity up to 22GW of power generating to be installed by 2030. More than 60 % of the total capacity is planned to be solar photovoltaic (PV). Like Algeria, Morocco has integrated development project with a target to develop by 2020 a 2000 MW capacity of electricity production from solar energy. The Tunisian government has launched its first phase of the renewable power generation program, with an objective to install 1,000 MW of renewable power capacity over the 2017-2020 periods, where 650 MW of the total capacity is planned to be solar and 350 MW wind. One of the leading Arab country in wind energy, these recent years is Egypt, with its more than 700 megawatt of operational power generation plants and has launched significant projects development in solar energy. Regarding Jordan, the government has taken different steps in this field of energy with a Strategy plan 2007-2020, by implementing a large scale of projects on renewable energy sources, with an objective to cover 10% of the country’s energy supply, from renewable sources by the year 2020. Concerning Lebanon, the country is looking to attain an integration of 12 % by 2020.
Prototype solar heating and combined heating and cooling systems
NASA Technical Reports Server (NTRS)
1977-01-01
Eight prototype solar heating and combined heating and cooling systems are being developed. The effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.
Aerodynamic stability analysis of NASA J85-13/planar pressure pulse generator installation
NASA Technical Reports Server (NTRS)
Chung, K.; Hosny, W. M.; Steenken, W. G.
1980-01-01
A digital computer simulation model for the J85-13/Planar Pressure Pulse Generator (P3 G) test installation was developed by modifying an existing General Electric compression system model. This modification included the incorporation of a novel method for describing the unsteady blade lift force. This approach significantly enhanced the capability of the model to handle unsteady flows. In addition, the frequency response characteristics of the J85-13/P3G test installation were analyzed in support of selecting instrumentation locations to avoid standing wave nodes within the test apparatus and thus, low signal levels. The feasibility of employing explicit analytical expression for surge prediction was also studied.
Carrasco, Juan A; Dormido, Sebastián
2006-04-01
The use of industrial control systems in simulators facilitates the execution of engineering activities related with the installation and the optimization of the control systems in real plants. "Industrial control system" intends to be a valid term that would represent all the control systems which can be installed in an industrial plant, ranging from complex distributed control systems and SCADA packages to small single control devices. This paper summarizes the current alternatives for the development of simulators of industrial plants and presents an analysis of the process of integrating an industrial control system into a simulator, with the aim of helping in the installation of real control systems in simulators.
Installation and service manual for the U.S. Geological Survey manometers
Craig, James D.
1983-01-01
The purpose of this manual is to describe the installation, operation, and maintenance of the bubble-gage manometers currently (1982) used by the U.S. Geological Survey. Other applications of these devices, such as the long manometer and differential manometer, are discussed, and accessories available for them are described. The bubble gage (water-stage manometer with gas-purge system) described in the Installation and Service Manual, October 1962, has been extensively modified and developed into the STACOM (stabilized and temperature compensated) device. This chapter is the manual for the STACOM unit and an update of the manual for the screw-type bubble gage. A parts list is included for both units.
A new electronic scanner of pressure designed for installation in wind-tunnel models
NASA Technical Reports Server (NTRS)
Coe, C. T.; Parra, G. T.; Kauffman, R. C.
1981-01-01
A new electronic scanner of pressure (ESOP) has been developed by NASA Ames Research Center for installation in wind-tunnel models. An ESOP system includes up to 20 pressure modules, each with 48 pressure transducers, an A/D converter, a microprocessor, a data controller, a monitor unit, and a heater controller. The system is sized so that the pressure modules and A/D converter module can be installed within an average-size model tested in the Ames Aerodynamics Division wind tunnels. This paper describes the ESOP system, emphasizing the main element of the system - the pressure module. The measured performance of the overall system is also presented.
The Financial Impact of Using TMR in a Private Group Practice
Templeton, Joan; Bernes, Marshall; Ostrowski, Maureen
1982-01-01
The installation of a computerized financial system is usually preceded by a cost-benefit analysis showing a positive impact on the facility's financial picture. The administration expects reduction in some operating costs (exclusive of the system and the installation costs) and an improvement in collecting accounts receivable. When California Primary Physicians installed TMR, certain costs were reduced, and the business office did become more efficient. However, because TMR is an integrated medical/financial system, other financial benefits accrued to the practice that billing systems would never be able to provide. This paper discusses the financial impact of TMR on cost reduction, accounts receivable collection, revenue tracking, and program development and marketing.
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
A crane lifts the Orion Service Module Umbilical (OSMU) high up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
2016-10-19
A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-11-10
A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-10-19
A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the south wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-10-19
Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a construction worker assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-11-10
A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-11-10
A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
NASA Astrophysics Data System (ADS)
Guachamin Acero, Wilson; Gao, Zhen; Moan, Torgeir
2017-09-01
Current installation costs of offshore wind turbines (OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study (based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies (RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel (HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV (in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV (which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting (response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather- and water depth-sensitivity, this novel procedure is demonstrated to be viable.
Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-09-01
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less
Wing Infrastructure and Development Outlook (WINDO) Final Environmental Assessment
2006-06-01
installation, and repair F Construct revetment , paint taxi lines, install runway shoulders, extend/repair flight line, maintain airfield pavement...RKMF990065 CONSTRUCT CHAPEL MEETING FAC C RKMF000041 CONSTRUCT REVETMENT LOLA SUPPORT FAC F RKMF010042 CONSTRUCT SHOULDERS RUNWAY 03L/21R F RKMF030054...100-foot transect intervals. Sampling utilized 100- foot intervals in blocks . Isolate artifacts were recorded on site forms until 1996. They were
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…
Defense Infrastructure: DOD Efforts to Prevent and Mitigate Encroachment at Its Installations
2016-11-01
protected habitat, climate change, urban development, and airborne noise. DOD, the military services, and individual installations have a number of...carrying out realistic training because of the cumulative effect of outside influences —such as encroachment from urban growth—that GAO refers to in...airborne noise, urban growth, physical obstructions, and renewable energy projects. DOD Directive 3200.15, Sustaining Access to the Live Training and Test
Automatic Publication of a MIS Product to GeoNetwork: Case of the AIS Indexer
2012-11-01
installation and configuration The following instructions are for installing and configuring the software packages Java 1.6 and MySQL 5.5 which are...An Automatic Identification System (AIS) reception indexer Java application was developed in the summer of 2011, based on the work of Lapinski and...release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT An Automatic Identification System (AIS) reception indexer Java application was
Small Wind Turbine Installation Compatibility Demonstration Methodology
2013-08-01
was conducted for the Installation Technology Transfer Pro - gram. The project manager was Debbie Lawrence, US Army Engineer Re- search and Development...concerns (Rowley 2009). Though bases ban wind farms on or near DoD facilities when they are an- ticipated to be an unreasonable national security risk...related data collected by Fort Drum and a variety of other governmental agencies and private organizations. The pro - cess involved natural resources
3. ONE OF SIX SPUR GEARS AND CABLE SPOOLS INSTALLED ...
3. ONE OF SIX SPUR GEARS AND CABLE SPOOLS INSTALLED IN THE UPPER FALLS GATE HOUSE. THE SHIFTING LEVER IS VISIBLE IN FOREGROUND, AS IS THE 3X3 1/16 SHAFT, LOOKING EAST, NORTHEAST. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
Yakama Nation Renewable Energy Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigdon, Phillip
2016-05-10
It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less
Advanced mooring method for installation of Enserch Garden Banks 388 FPF mooring legs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Honig, H.J.; Koolwijk, W.; Scovell, D.C.
1995-12-31
In the fall of 1994 HeereMac v.o.f installed the 12 mooring legs for Enserch Exploration`s Floating Production Facility in Garden Banks Block 388 in the Gulf of Mexico with the SSCV Balder. The installation of the catenary mooring system, each leg comprising several varying sections of spiral strand wire and chain, required sufficient handling and maneuverability power of the vessel, while enough holding capacity and stiffness of the system had to be provided. The most important aspects of the actual installation of the mooring legs are explained, for example, the use of a purpose built tipping winch. The method selectedmore » by HeereMac for station-keeping the Balder was to use a minimum number of anchor lines in combination with a tug, in order to maintain position and at the same time have an easy and controlled method of maneuvering to a new position. The method of station-keeping the SSCV in this way is part of a development towards full position control with a spread of tugs. In this paper the station-keeping system is described and the offshore experiences with the system are discussed. Some future developments with respect to tug-assisted station-keeping systems are highlighted.« less
Algorithm of composing the schedule of construction and installation works
NASA Astrophysics Data System (ADS)
Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr
2017-10-01
An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.
Development of a pin-post insulator with built-in metal oxide varistors for distribution lines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fujiwara, N.; Yoneyama, T.; Hamada, Y.
1996-04-01
A 6.6 kV pin-post insulator, incorporating ZnO varistors, has been developed in order to reduce line faults caused by direct lighting strikes, thereby reducing and simplifying maintenance work on distribution systems. The developed insulators are interchangeable with conventional pin insulators and can withstand internal fault currents twice upon their failures. The simulated results regarding the response of the developed insulators to direct lightning strikes on an overhead ground wire agreed well with the experimental results. Simulation studies also revealed that installing the developed insulators on every two poles reduces the line-fault rate of present distribution lines in case of directmore » lightning strikes by 33%, while installing them on every pole reduces the rate by 97.5% or about 1/40 of the original value.« less
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The progress made in the manufacture, test, evaluation, installation, problem resolution, performance evaluation, and development of eight prototype solar heating and combined heating and cooling systems is described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, Abraham; Schneider, Gia; McKinstry, Katherine
Natel Energy is a low-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-head, high-flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state-ofthe-art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or abovemore » tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Elise B.; Edwards, Thomas B.
In 2015, a program was initiated to carefully track and monitor the growth of the solar industry in SC. Prior to then, little information was available on the costs associated with distributed photovoltaic (PV) installations in the Southeastern US. For this report, data were collected from businesses on the number of hires they had at the end of 2014 and compared with data for 2015 and June 2016. It was found that the percentage of installers within the state who serve the residential sector increased to 82% from 67%. During the same time period, the average size of initiated installationsmore » for residential, commercial, and utility scale installations all trended upwards. Where residential installations were typically 5 kW-DC in 2014, they were typically 10 kW-DC by late 2015 and in mid-2016. For commercial installations, the average size grew from 84 kW-DC in 2014 to between 136-236 kW-DC in 2015 and then 188-248 kWDC in mid-2016. An exception was seen in utility scale installations where a 2.3 MW-DC system was common in 2014, the size grew to be 5-15 MW-DC in late 2015. The average size dropped 3.1-4.4 MWDC in mid-June 2016, though individual averages up to 20 MW-DC were reported.« less
Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.
2010-08-30
Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to whichmore » this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.« less
Treatment of wastewater from flue gas desulphurization plants in the Netherlands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vredenbregt, L.H.J.; Brugghen, F.W. van der; Enoch, G.D.
1995-06-01
In the Netherlands, all coal fired boilers of power stations are equipped with a wet lime(stone)-gypsum flue gas desulphurization (FGD) installation in order to fulfill the emission demands for SO{sub 2}. These wet FGD installations produce a wastewater stream containing impurities like suspended solids and traces of heavy metals like As, Cd, Cr, Cu, Hg, Ni, Pb, Sb, Se and Za. As the target values stated by the licensing authorities are very stringent, most of these heavy metals and suspended solids have to be removed to very low concentration levels. Therefore, a very efficient treatment method, based on coprecipitation ofmore » heavy metal hydroxides and sulphides, which was developed by KEMA, has been installed at all, the coal fired power plants. This paper describes the operational experiences until now with these wastewater treatment installations at two coal fired power plants using sea-water for make-up and one using fresh water. The following aspects will be discussed in more detail: reliability of the wastewater treatment processes both with respect to removal efficiency of heavy metals and suspended solids and plant operation itself influence of a changing composition of the wastewater on the performance of these wastewater treatment installations. Finally, also the impact of co-firing of the sludge produced in these wastewater treatment installations will be discussed.« less
NASA Technical Reports Server (NTRS)
Anderson, Bernhard H.; Levy, Ralph
1991-01-01
A reduced Navier-Stokes solution technique was successfully used to design vortex generator installations for the purpose of minimizing engine face distortion by restructuring the development of secondary flow that is induced in typical 3-D curved inlet ducts. The results indicate that there exists an optimum axial location for this installation of corotating vortex generators, and within this configuration, there exists a maximum spacing between generator blades above which the engine face distortion increases rapidly. Installed vortex generator performance, as measured by engine face circumferential distortion descriptors, is sensitive to Reynolds number and thereby the generator scale, i.e., the ratio of generator blade height to local boundary layer thickness. Installations of corotating vortex generators work well in terms of minimizing engine face distortion within a limited range of generator scales. Hence, the design of vortex generator installations is a point design, and all other conditions are off design. In general, the loss levels associated with a properly designed vortex generator installation are very small; thus, they represent a very good method to manage engine face distortion. This study also showed that the vortex strength, generator scale, and secondary flow field structure have a complicated and interrelated influence over engine face distortion, over and above the influence of the initial arrangement of generators.
NASA Astrophysics Data System (ADS)
Radomski, Bartosz; Ćwiek, Barbara; Mróz, Tomasz M.
2017-11-01
The paper presents multicriteria decision aid analysis of the choice of PV installation providing electric energy to a public utility building. From the energy management point of view electricity obtained by solar radiation has become crucial renewable energy source. Application of PV installations may occur a profitable solution from energy, economic and ecologic point of view for both existing and newly erected buildings. Featured variants of PV installations have been assessed by multicriteria analysis based on ANP (Analytic Network Process) method. Technical, economical, energy and environmental criteria have been identified as main decision criteria. Defined set of decision criteria has an open character and can be modified in the dialog process between the decision-maker and the expert - in the present case, an expert in planning of development of energy supply systems. The proposed approach has been used to evaluate three variants of PV installation acceptable for existing educational building located in Poznań, Poland - the building of Faculty of Chemical Technology, Poznań University of Technology. Multi-criteria analysis based on ANP method and the calculation software Super Decisions has proven to be an effective tool for energy planning, leading to the indication of the recommended variant of PV installation in existing and newly erected public buildings. Achieved results show prospects and possibilities of rational renewable energy usage as complex solution to public utility buildings.
BioconductorBuntu: a Linux distribution that implements a web-based DNA microarray analysis server.
Geeleher, Paul; Morris, Dermot; Hinde, John P; Golden, Aaron
2009-06-01
BioconductorBuntu is a custom distribution of Ubuntu Linux that automatically installs a server-side microarray processing environment, providing a user-friendly web-based GUI to many of the tools developed by the Bioconductor Project, accessible locally or across a network. System installation is via booting off a CD image or by using a Debian package provided to upgrade an existing Ubuntu installation. In its current version, several microarray analysis pipelines are supported including oligonucleotide, dual-or single-dye experiments, including post-processing with Gene Set Enrichment Analysis. BioconductorBuntu is designed to be extensible, by server-side integration of further relevant Bioconductor modules as required, facilitated by its straightforward underlying Python-based infrastructure. BioconductorBuntu offers an ideal environment for the development of processing procedures to facilitate the analysis of next-generation sequencing datasets. BioconductorBuntu is available for download under a creative commons license along with additional documentation and a tutorial from (http://bioinf.nuigalway.ie).
Logistics Process Analysis ToolProcess Analysis Tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
2008-03-31
LPAT is the resulting integrated system between ANL-developed Enhanced Logistics Intra Theater Support Tool (ELIST) sponsored by SDDC-TEA and the Fort Future Virtual Installation Tool (sponsored by CERL). The Fort Future Simulation Engine was an application written in the ANL Repast Simphony framework and used as the basis for the process Anlysis Tool (PAT) which evolved into a stand=-along tool for detailed process analysis at a location. Combined with ELIST, an inter-installation logistics component was added to enable users to define large logistical agent-based models without having to program. PAT is the evolution of an ANL-developed software system called Fortmore » Future Virtual Installation Tool (sponsored by CERL). The Fort Future Simulation Engine was an application written in the ANL Repast Simphony framework and used as the basis for the Process Analysis Tool(PAT) which evolved into a stand-alone tool for detailed process analysis at a location (sponsored by the SDDC-TEA).« less
The development of the Garden Banks block 388 FPF mooring system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dove, P.G.S.; Librino, F.; Scovell, D.C.
1995-12-01
This paper discusses work conducted during the design, procurement and installation of Enserch Exploration, Inc.`s Garden Banks 388 FPF mooring system. The design began with the execution of a trade-off study evaluating and comparing previously installed floating production moorings in the Gulf of Mexico, coupled with evaluation of new concepts and emphasis on cost effective solutions. The design effort involved dynamic analysis and wind tunnel and model tank testing, all in accordance with the newly completed API document RP 2FP1. Inspection of various components from the Placid GC-29 FPS moorings (installed in 1987 and recovered in 1990) determined that sectionsmore » of chain, jacketed spiral strand wire rope, submersible buoys and connectors could be reused with suitable refurbishment. The excellent condition of the rig`s onboard winching system also resulted in the reuse of the windlasses, with specified upgrades. Because a sufficient amount of used wire was not available, a bare spiral strand wire rope construction was adopted, including zinc anodes in the new sections, rather than jacketed strand. The lack of cost effective installation vessels in the Gulf of Mexico at the time of the installation bid posed challenges to Enserch. However, an innovative preset mooring installation scheme involving Heeremac`s SSCV Balder on its own moorings was adopted. Since the vessel was already in the Gulf of Mexico on contract for other projects, a cost effective contract was negotiated. The results of this effort led to considerable cost savings for Enserch, compared to conventional FPF mooring systems previously installed in the Gulf of Mexico.« less
Park, Duckshin; Lee, Taejeong; Lee, Yongil; Jeong, Wonseog; Kwon, Soon-Bark; Kim, Dongsool; Lee, Kiyoung
2017-01-01
Emission reduction is one of the most efficient control measures in fuel-powered locomotives. The purpose of this study was to determine the reduction in particulate matter (PM) and black carbon (BC) emissions following the installation of a fuel activation device (FAD). The FAD was developed to enhance fuel combustion by atomizing fuel and to increase the surface area per unit volume of injected fuel. Emission reduction by the FAD was evaluated by installing a FAD in an operating diesel locomotive in Mongolia. The test was conducted on a train operating on a round-trip 238-km route between Ulaanbaatar and Choir stations in Mongolia. The fuel consumption rate was slightly reduced following the FAD installation. The FAD installation decreased PM and BC emissions in the diesel locomotive, especially coarse PM. The PM 10 reductions achieved after FAD installation were 58.0, 69.7, and 34.2% for the constant velocity, stopping, and acceleration stages of the train's operation, respectively. The BC reduction rates were 29.5, 52.8, and 27.4% for the constant velocity, stopping, and acceleration stages, respectively. Copyright © 2016 Elsevier B.V. All rights reserved.
NASA Technical Reports Server (NTRS)
Miller, Darcy
2000-01-01
Foreign object debris (FOD) is an important concern while processing space flight hardware. FOD can be defined as "The debris that is left in or around flight hardware, where it could cause damage to that flight hardware," (United Space Alliance, 2000). Just one small screw left unintentionally in the wrong place could delay a launch schedule while it is retrieved, increase the cost of processing, or cause a potentially fatal accident. At this time, there is not a single solution to help reduce the number of dropped parts such as screws, bolts, nuts, and washers during installation. Most of the effort is currently focused on training employees and on capturing the parts once they are dropped. Advances in ergonomics and hand tool design suggest that a solution may be possible, in the form of specialty hand tools, which secure the small parts while they are being handled. To assist in the development of these new advances, a test methodology was developed to conduct a usability evaluation of hand tools, while performing tasks with risk of creating FOD. The methodology also includes hardware in the form of a testing board and the small parts that can be installed onto the board during a test. The usability of new hand tools was determined based on efficiency and the number of dropped parts. To validate the methodology, participants were tested while performing a task that is representative of the type of work that may be done when processing space flight hardware. Test participants installed small parts using their hands and two commercially available tools. The participants were from three groups: (1) students, (2) engineers / managers and (3) technicians. The test was conducted to evaluate the differences in performance when using the three installation methods, as well as the difference in performance of the three participant groups.
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Administration. 3285.1 Section 3285.1 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These...
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Administration. 3285.1 Section 3285.1 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These...
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Administration. 3285.1 Section 3285.1 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These...
Natural conditions and administrative settings for concentrating photovoltaics in China
NASA Astrophysics Data System (ADS)
Fu, Ling; Chen, Xiaoyuan; Leutz, Ralf
2012-10-01
It is an inevitable trend for China to develop green technologies to help the country to produce cleaner energy and to consume it more efficiently, under the pressure of energy security concern, the nation's emissions trajectory and sustainable economic development. The abundant solar resources in West China provide a big potential to utilize the solar energy. Under the promotion of key incentive policies including both feed-in-tariff (FIT) mechanisms and government rebate programs, China has become a major global solar force in photovoltaic (PV) industry both in manufacturing and in the installation of flat-plate products, with 16 GW production and 2.75 GW installation achieved in the year 2011. As a branch of PV technology, concentrating photovoltaics (CPV) technology with several years' development history in China is presently moving from pilot facilities to commercial-scale applications. Several MW-CPV power plants have been installed by both domestic and western companies in China, factories with several hundred-MW production capacity are being planned or built. Sustainable performance and reliability improvement of CPV modules, a vertical integration of supply chain in CPV industry aiming at a cost reduction, a sufficient grid infrastructure for facilitating the West-East and North-South electricity transmission will promote Chinese CPV market to actually initiate, develop and mature.
A new environment for multiple spacecraft power subsystem mission operations
NASA Technical Reports Server (NTRS)
Bahrami, K. A.
1990-01-01
The engineering analysis subsystem environment (EASE) is being developed to enable fewer controllers to monitor and control power and other spacecraft engineering subsystems. The EASE prototype has been developed to support simultaneous real-time monitoring of several spacecraft engineering subsystems. It is being designed to assist with offline analysis of telemetry data to determine trends, and to help formulate uplink commands to the spacecraft. An early version of the EASE prototype has been installed in the JPL Space Flight Operations Facility for online testing. The EASE prototype is installed in the Galileo Mission Support Area. The underlying concept, development, and testing of the EASE prototype and how it will aid in the ground operations of spacecraft power subsystems are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musial, Walt
2015-11-12
Specifically, the work under this CRADA includes, but is not limited to, the development of test procedures for an offshore test site in Delaware waters; testing of installed offshore wind turbines; performance monitoring of those turbines; and a program of research and development on offshore wind turbine blades, components, coatings, foundations, installation and construction of bottom-fixed structures, environmental impacts, policies, and more generally on means to enhance the reliability, facilitate permitting, and reduce costs for offshore wind turbines. This work will be conducted both at NREL's National Wind Technology Center and participant facilities, as well as the established offshore windmore » test sites.« less
[COMPLICATIONS OF STENTINGOF UPPER URINARY TRACT].
Shkodkin, S V; Kogan, M I; Lyubushkin, A V; Miroshnichenko, O V
2015-01-01
Restoring the passage of urine through the upper urinary tract routinely is achieved by installing of external or internal drainage. Due to its objective advantages, internal drainage has been successfully used in surgery of the upper urinary tract. This review outlines the problems associated with the use ofinternal stents, namely difficultyin installation, migration, and reflux and stent obstruction, bacterial colonization of the stent, the development of functional and morphological changes in the drained segment of urinary tract.
Maritime Analytics Prototype: Final Development Report
2014-04-01
access management platform OpenAM , support for multiple instances of the same type of widget and support for installation specific configuration files to...et de la gestion de l’accès OpenAM , le support pour plusieurs instances du même type de widget et le support des fichiers d’installation de...open source authentication and access management platform OpenAM , support for multiple instances of the same type of widget and support for
VIEW OF THE INSTALLATION OF AN EXTRUSION PRESS IN THE ...
VIEW OF THE INSTALLATION OF AN EXTRUSION PRESS IN THE HIGH BAY AREA OF BUILDING 865. THE EXTRUSION PRESS WAS USED TO PRODUCE CYLINDRICAL BARS, HOLLOW TUBES, AND SHAPES WITH IRREGULAR CROSS-SECTIONS BY FORCING PREHEATED METAL THROUGH A DIE ORIFICE UNDER HIGH PRESSURE. (5/22/70) - Rocky Flats Plant, Metal Research & Development Laboratory, South of Central Avenue at south end of terminus of Ninth Avenue, Golden, Jefferson County, CO
Permafrost Ecosystem Warming Prototype: Installation, Operation, and Initial Site Characterization
2013-11-01
report Approved for public release; distribution is unlimited. Prepared for US Army Corps of Engineers Washington , DC 20314-1000 Monitored by...in 3 m diameter plots in a temperate deciduous forest. To further develop the prototype for an arctic climate, a similar test system was installed...growth trees and shrubs. The site was chosen because of its permafrost characteristics, ease of access, and its close proximity to the CRREL Fairbanks
2005-09-01
Facilities Layout o Scope problem with client in terms of options for M&S facilities layouts with regards to infrastructure, personnel... Facilities Layout o Develop M&S Installation Facilities Layout Design(s) Requirements and Milestones: • Scope problem with client (systems on which...objectives of this study are to (a) identify the desired technology and facilities layouts which would enhance inter-installation simulation
2006-11-01
exercises. Potential Resolution: 1. Installations must ensure that they understand the composition of civilian populations outside of their...Installation trainers, SRP Support Agency trainers or contract training specialists should layout each range based on the composition defined in the...defined time limit to respond to submittals with a pre-defined team member composition so that changes could be reviewed consistently. Only mission
Perimeter intrusion detection and assessment system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eaton, M.J.; Jacobs, J.; McGovern, D.E.
1977-11-01
To obtain an effective perimeter intrusion detection system requires careful sensor selection, procurement, and installation. The selection process involves a thorough understanding of the unique site features and how these features affect the performance of each type of sensor. It is necessary to develop procurement specifications to establish acceptable sensor performance limits. Careful explanation and inspection of critical installation dimensions is required during on-site construction. The implementation of these activities at a particular site is discussed.
2015-10-01
Clip Additively Manufactured • The Navy installed a 3D printer aboard the USS Essex to demonstrate the ability to additively develop and produce...desired result and vision to have the capability on the fleet. These officials stated that the Navy plans to install 3D printers on two additional...DEFENSE ADDITIVE MANUFACTURING DOD Needs to Systematically Track Department-wide 3D Printing Efforts Report to
Developing infrastructure for interconnecting transportation network and electric grid.
DOT National Transportation Integrated Search
2011-09-01
This report is primarily focused on the development of mathematical models that can be used to : support decisions regarding a charging station location and installation problem. The major parts : of developing the models included identification of t...
Development of guided horizontal boring tools. Final report, June 1984-March 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, W.J.; Herben, W.C.; Pittard, G.T.
Maurer Engineering Inc. (MEI), under a contract with the Gas Research Institute (GRI), has led a team of research and manufacturing companies with the goal of developing a guided boring tool for installing gas distribution piping. Studies indicated guided horizontal boring systems can provide gas utilities with a more effective and economical method for installing pipe than conventional techniques with a potential cost savings of at least 15% to 50%. A comprehensive state of technology review of horizontal boring tools identified concepts appropriate to being directionally controlled. Development of a universal system was found impractical because the requirements for shortmore » and extended range systems are significantly different. Concepts for steering and tracking were evaluated through lab and field experiments which progressed from proof of concept tests to cooperative field tests with gas utilities at the various stages of system development. The systems were brought to commercial status with needed modifications and the technology transferred to licensees who would market the systems. The program resulted in the development and commercialization of five distinct guided boring system. Pipe can now be installed more rapidly over longer distances with a minimal amount of excavation required for launching and retrieval. This means increased work crew productivity, reduced disturbance to landscaping and environmentally sensitive areas, and reduced traffic disruption and public inconvenience.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kartashov,V.V.; Pratt,W.; Romanov, Y.A.
The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Departmentmore » of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.« less
Nacelle Aerodynamic and Inertial Loads (NAIL) project
NASA Technical Reports Server (NTRS)
1982-01-01
A flight test survey of pressures measured on wing, pylon, and nacelle surfaces and of the operating loads on Boeing 747/Pratt & Whitney JT9D-7A nacelles was made to provide information on airflow patterns surrounding the propulsion system installations and to clarify processes responsible for inservice deterioration of fuel economy. Airloads at takeoff rotation were found to be larger than at any other normal service condition because of the combined effects of high angle of attack and high engine airflow. Inertial loads were smaller than previous estimates indicated. A procedure is given for estimating inlet airloads at low speeds and high angles of attack for any underwing high bypass ratio turbofan installation approximately resembling the one tested. Flight procedure modifications are suggested that may result in better fuel economy retention in service. Pressures were recorded on the core cowls and pylons of both engine installations and on adjacent wing surfaces for use in development of computer codes for analysis of installed propulsion system aerodynamic drag interference effects.
An analysis of messages about tobacco in military installation newspapers.
Haddock, C Keith; Parker, L Carrie; Taylor, Jennifer E; Poston, Walker S C; Lando, Harry; Talcott, G Wayne
2005-08-01
We sought to gauge the relative attention that tobacco control receives in military newspapers by comparing coverage of tobacco use with that of other health topics of importance to the military. We examined tobacco-related articles and industry advertisements in 793 newspapers published during 1 year at 16 representative military installations (4 Air Force, 6 Army, 2 Marine, 4 Navy). Newspaper content was coded with a standardized coding manual developed through previous research. Tobacco use received the fewest instances of coverage and the least print space in military installation newspapers of all the health topics examined. The primary "message frame" used in tobacco control articles was that smokers are putting themselves at health risk, a theme that has not been found to have a strong effect on smokers. Nearly 10% of the newspapers contained tobacco advertisements. Tobacco control messages are underrepresented in military installation newspapers compared with other health issues. Furthermore, military newspapers send mixed messages to military personnel by providing advertisements for tobacco while also claiming that tobacco use is harmful.
Field Trial of an Aerosol-Based Enclosure Sealing Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrington, Curtis; Springer, David
2015-09-01
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology.« less
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.
NASA Technical Reports Server (NTRS)
1972-01-01
A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.
Prototype solar-heated hot water systems and double-walled heat exchangers
NASA Technical Reports Server (NTRS)
1978-01-01
Development progress made on two solar-heated hot water systems and two heat exchangers is reported. The development, manufacture, installation, maintenance, problem resolution, and system evaluation are described.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
A vehicle support post will lifted up by crane and lowered onto the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Orion Service Module Umbilical (OSMU) Installation on Mobile Launcher (ML)
2017-03-13
Cranes and rigging are being used to lift the bracket for the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower. The tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
A crane and rigging are used to lift the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
Preparations are underway to lift the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
Seeming to hang in midair, the Orion Service Module Umbilical (OSMU) is lifted high up by crane for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
A crane and rigging are used to position the Orion Service Module Umbilical (OSMU) for installation high up on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
A crane and rigging are used to lift the Orion Service Module Umbilical (OSMU) high up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
2016-12-16
Construction workers wearing safety harnesses and tethered lines assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. They are securing the large bolts that hold the platform securely in place on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-11-10
A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
2016-12-16
A construction worker solders a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.
24 CFR 3285.804 - Bottom board repair.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Bottom board repair. 3285.804 Section 3285.804 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Exterior and Interior Close-Up § 3285...
24 CFR 3285.703 - Smoke alarms.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285.703 Smoke... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Smoke alarms. 3285.703 Section 3285.703 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued...
24 CFR 3285.502 - Expanding rooms.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Expanding rooms. 3285.502 Section 3285.502 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.502 Expanding rooms. The...
A Plasma Diagnostic Set for the Study of a Variable Specific Impulse Magnetoplasma Rocket
NASA Astrophysics Data System (ADS)
Squire, J. P.; Chang-Diaz, F. R.; Bengtson Bussell, R., Jr.; Jacobson, V. T.; Wootton, A. J.; Bering, E. A.; Jack, T.; Rabeau, A.
1997-11-01
The Advanced Space Propulsion Laboratory (ASPL) is developing a Variable Specific Impulse Magnetoplasma Rocket (VASIMR) using an RF heated magnetic mirror operated asymmetrically. We will describe the initial set of plasma diagnostics and data acquisition system being developed and installed on the VASIMR experiment. A U.T. Austin team is installing two fast reciprocating probes: a quadruple Langmuir and a Mach probe. These measure electron density and temperature profiles, electrostatic plasma fluctuations, and plasma flow profiles. The University of Houston is developing an array of 20 highly directional Retarding Potential Analyzers (RPA) for measuring ion energy distribution function profiles in the rocket plume, giving a measurement of total thrust. We have also developed a CAMAC based data acquisition system using LabView running on a Power Macintosh communicating through a 2 MB/s serial highway. We will present data from initial plasma operations and discuss future diagnostic development.
NASA Astrophysics Data System (ADS)
Ohminato, T.; Kaneko, T.; Koyama, T.; Yasuda, A.; Watanabe, A.; Takeo, M.; Honda, Y.; Kajiwara, K.; Kanda, W.; Iguchi, M.; Yanagisawa, T.
2010-12-01
Observations in the vicinity of summit area of active volcanoes are important not only for understanding physical processes in the volcanic conduit but also for eruption prediction and volcanic hazards mitigation. It is, however, challenging to install observation sensors near active vents because of the danger of sudden eruptions. We need safe and efficient ways of installing sensors near the summit of active volcanoes. We have been developing an volcano observation system based on an unmanned autonomous vehicle (UAV) for risk-free volcano observations. Our UAV is an unmanned autonomous helicopter manufactured by Yamaha-Motor Co., Ltd. The UAV is 3.6m long and weighs 84kg with maximum payload of 10kg. The UAV can aviate autonomously along a previously programmed path within a meter accuracy using real-time kinematics differential GPS equipment. The maximum flight time and distance from the operator are 90 minutes and 5km, respectively. We have developed various types of volcano observation techniques adequate for the UAV, such as aeromagnetic survey, taking infrared and visible images from onboard high-resolution cameras, volcanic ash sampling in the vicinity of active vents. Recently, we have developed an earthquake observation module (EOM), which is exclusively designed for the UAV installation in the vicinity of active volcanic vent. In order to meet the various requirements for UAV installation, the EOM is very compact, light-weight (5-6kg), and is solar-powered. It is equipped with GPS for timing, a communication device using cellular-phone network, and triaxial accelerometers. Our first application of the EOM installation using the UAV is one of the most active volcanoes in Japan, Sakurajima volcano. Since 2006, explosive eruptions have been continuing at the reopened Showa crater at the eastern flank near the summit of Sakurajima. Entering the area within 2 km from the active craters is prohibited, and thus there were no observation station in the vicinity of active vents at the summit area. From November 2nd to 12th, 2009, we could successfully install four EOMs in the summit area within 2km from the active craters by using the UAV. Although the state of communication was not perfect since the installation points were outside of the service area of the cellular-phone network, we succeeded in retrieving the seismic waveform data accompanying moderate eruptions at Showa crater. Except for contamination by the mechanical resonance of the frame of EOM around 35 Hz, the recorded waveforms of the explosive eruptions are as good as the best permanent stations in Sakurajima. Preliminary results of the analyses show that the source location distribution of the explosion earthquakes at Showa crater is improved by the inclusion of the near source stations newly installed by using the UAV.
Deep ocean corrosion research in support of Oman India gas pipeline
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, F.W.; McKeehan, D.S.
1995-12-01
The increasing interest in deepwater exploration and production has motivated the development of technologies required to accomplish tasks heretofore possible only onshore and in shallow water. The tremendous expense of technology development and the cost of specialized equipment has created concerns that the design life of these facilities may be compromised by corrosion. The requirements to develop and prove design parameters to meet these demands will require an ongoing environmental testing and materials evaluation and development program. This paper describes a two-fold corrosion testing program involving: (1) the installation of two corrosion test devices installed in-situ, and (2) a laboratorymore » test conducted in simulated site-specific seawater. These tests are expected to qualify key parameters necessary to design a cathodic protection system to protect the Oman-to-India pipeline.« less
Data from a thick unsaturated zone in Joshua Tree, San Bernardino County, California, 2007--09
Burgess, Matthew; Izbicki, John; Teague, Nicholas; O'Leary, David R.; Clark, Dennis; Land, Michael
2012-01-01
Data were collected on the physical properties of unsaturated alluvial deposits, the chemical composition of leachate extracted from unsaturated alluvial deposits, the chemical and isotopic composition of groundwater and unsaturated-zone water, and the chemical composition of unsaturated-zone gas at four monitoring sites in the southwestern part of the Mojave Desert in the town of Joshua Tree, San Bernardino County, California. The presence of denitrifying and nitrate-reducing bacteria from unsaturated alluvial deposits was evaluated for two of these monitoring sites that underlie unsewered residential development. Four unsaturated-zone monitoring sites were installed in the Joshua Tree area—two in an unsewered residential development and two adjacent to a proposed artificial-recharge site in an undeveloped area. The two boreholes in residential development areas were installed by using the ODEX air-hammer method. One borehole was drilled through the unsaturated zone to a depth of 541 ft (feet) below land surface; a well screened across the water table was installed. Groundwater was sampled from this well. The second borehole was drilled to a depth of 81 ft below land surface. Drilling procedures, lithologic and geophysical data, construction details, and instrumentation placed in these boreholes are described. Core material was analyzed for water content, bulk density, matric potential, particle size, and water retention. The leachate from over 500 subsamples of cores and cuttings was analyzed for soluble anions, including fluoride, sulfate, bromide, chloride, nitrate, nitrite, and orthophosphate. Groundwater was analyzed for major ions, inorganic compounds, select trace elements, and isotopic composition. Unsaturated-zone water from suction-cup lysimeters was analyzed for major ions, inorganic compounds, select trace elements, and isotopic composition. Unsaturated-zone gas samples were analyzed for argon, oxygen, nitrogen, methane, carbon dioxide, ethane, nitrous oxide, and carbon monoxide. Drill cuttings were analyzed for denitrifying and nitrate-reducing bacteria. One of the boreholes installed adjacent to the Joshua Basin Water District proposed groundwater-recharge facility was installed by using the ODEX air-hammer method and the other was installed by using a 7.875-inch hollow-stem auger. Drilling procedures, lithologic and geophysical data, construction details, and instrumentation placed in these boreholes are described; however, geochemical data were not available at the time of publication.
NASA Astrophysics Data System (ADS)
Shinohara, M.; Yamada, T.; Sakai, S.; Shiobara, H.; Kanazawa, T.
2014-12-01
A seismic and tsunami observation system using seafloor optical fiber had been installed off Sanriku, northeastern Japan in 1996. The objectives of the system are to obtain exact seismic activity related to plate subduction and to observe tsunami on seafloor. The continuous real-time observation has been carried out since the installation. In March 2011, the Tohoku earthquake occurred at the plate boundary near the Japan Trench, and the system recorded seismic waves and tsunamis by the mainshock. These data are useful to obtain accurate position of the source faults and source region of tsunami generated by the event. However, the landing station of the system was damaged by huge tsunami, and the observation was suspended. Because the real-time seafloor observation by cabled system is important in this region, we decide to reconstruct a landing station and install newly developed Ocean Bottom Cabled Seismic and Tsunami (OBCST) observation system for additional observation and/or replacement of the existing system. From 2005, we have been developed the new compact Ocean Bottom Cabled Seismometer (OBCS) system using Information and Communication Technology (ICT). Our system is characterized by securement of reliability by using TCP/IP technology and down-sizing of an observation node using up-to-date electronics technology. In 2010, the first OBCS was installed near Awashima-island in the Japan Sea, and is being operated continuously. The new OBCST system is placed as the second generation of our system, and has two types of observation nodes. Both types have accelerometers as seismic sensors. One type of observation nodes equips a crystal oscillator type pressure gauge as tsunami sensor. Another type has an external port for additional observation sensor by using Power over Ethernet technology. Clocks in observation nodes can be synchronized through TCP/IP protocol with an accuracy of 300 ns (IEEE 1588). A simple canister for tele-communication seafloor cable is adopted for the observation node, and has diameter of 26 cm and length of about 1.3 m. At the present, we are producing a practical OBCST system which has total length of approximately 100 km and three observation nodes. We have a plan to install the practical system in 2015.
28 CFR 90.52 - Eligible purposes.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., including the crimes of sexual assault and domestic violence; (2) Developing, training, or expanding units..., including the crimes of sexual assault and domestic violence; (3) Developing and implementing more effective... domestic violence; (4) Developing, installing, or expanding data collection and communication systems...
2016 Alabama PV soft cost and workforce development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, E.; Edwards, T.
The Southeastern US has the largest potential for growth in the solar industry. However, currently they languish behind the rest of the US. There are several bright spots including the large number of utility scale installations in North Carolina and the recent successes in South Carolina under Act 236. In order to better understand the impacts of state legislation on the growth of the solar industry in the SE US, the Savannah River National Laboratory has undertaken a study to look at the growth in each state in order to develop recommendations to help reduce the cost of solar andmore » to spur the industry. This is the second report in the series. The first focused on developing cost metrics for South Carolina under Act 236. This report focuses on Alabama, the 49th ranked state for solar business, which has very similar population and median income to South Carolina. For this survey, the ten known in-state installers were contacted. Responses were received from seven, representing 70% of the installers, a majority of which provide both residential and commercial installations. Interestingly, none of the respondents serve the utility scale sector. Overall, costs for Alabama are on track with the rest of the country with a reported average cost of $3.29/W-DC for residential systems and $2.44/W-DC for commercial systems. 60% of this cost is attributed to hardware only. Of the remaining costs, installation contributed to the largest percentage of soft costs followed by overhead, marketing and sales, and permitting, respectively. This also closely mirrors results seen in South Carolina. Job growth in the industry is expected to proceed well. An expected 34-42 additional full time equivalent jobs were expected to be added in Alabama within the six month window following the survey period. During the three years following the survey, this number was expected to double with 89-97 additional jobs being added to the market. In both cases, a vast majority of these jobs were for installation professionals and electricians. Despite the cost of solar, the industry continues to struggle in Alabama, largely due to the absence of any statewide net metering legislation. By current best estimates, there are over 60 residential installations statewide; however, this number is difficult to track due to the lack of a State authority keeping a consolidated list of grid connected distributed power systems. In South Carolina, the Energy Office tracks and reports grid connected distributed power systems by all Cooperatives and utilities. In Alabama, the Energy Office does not fulfill this role and data must be collected directly from each utility and cooperative, which makes collection and analysis difficult. Having a central state agency track this information would be extremely useful towards developing state policy recommendations, particularly if net metering were enabled within the state.« less
Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Monogarov, A.; Taranenko, V.; Serov,A
The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less
iMSRC: converting a standard automated microscope into an intelligent screening platform.
Carro, Angel; Perez-Martinez, Manuel; Soriano, Joaquim; Pisano, David G; Megias, Diego
2015-05-27
Microscopy in the context of biomedical research is demanding new tools to automatically detect and capture objects of interest. The few extant packages addressing this need, however, have enjoyed limited uptake due to complexity of use and installation. To overcome these drawbacks, we developed iMSRC, which combines ease of use and installation with high flexibility and enables applications such as rare event detection and high-resolution tissue sample screening, saving time and resources.
Dual frequency feed system for the CTS communications link characterization experiment
NASA Technical Reports Server (NTRS)
Gill, G. J.
1976-01-01
The developing, testing and installation of a dual frequency feed assembly were described. The feed has been designed to receive signals in the frequency range 11.7 to 12.2 GHz and transmit signals in the frequency range 14.12 GHz plus or minus 250 MHz. Complete performance data of the feed alone and installed in the 15 foot antenna is included herein. Drawings and descriptive information of the feed assembly are also given.
Brief: Multizone subsea completions in the Dai Hung field, Vietnam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lay, K.R.
1996-04-01
The early production phase of the Dai Hung field development involved drilling and completion of five subsea wells. Owing to the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. Downhole completion designs used equipment that was primarily of existing proven design, and downhole equipment was installed in a single trip. Ongoing reservoir management will be aided by use of a subsea wireline system to facilitate data acquisition.
2017-05-30
A view of the mobile launcher (ML) taken from the "eyebrow" of the nearby Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The ML tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The Orion Service Module Umbilical and Core State Forward Skirt Umbilical were recently installed on the ML. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Greenbelt Community Project: Solar energy retrofit for a multi-family dwelling
NASA Technical Reports Server (NTRS)
Hymowitz, E. W.; Hannemann, R. J.; Millman, L. L.; Pownell, J. E.
1978-01-01
A cooperative project was initiated between Goddard Space Flight Center and the nearby community of Greenbelt, Maryland. The purpose was to design, install and operate an experimental solar heating system on a group of four tandem town houses. The system was successfully developed and is operating. A description is given of the design, installation, system operation and performance as well as the important considerations for judging the economic feasibility of solar heating systems.
Feasibility of Nuclear Power on U.S. Military Installations. 2nd Revision
2011-03-01
Small Modular Reactor , Military Installation Energy, Energy Assurance 16. SECURITY CLASSIFICATION OF: a. REPORT I b. ABSTRACT U c. THIS PAGE i; 17. LIMITATION OF ABSTRACT SAR 18. NUMBER OF PAGES 98 19a. NAME OF RESPONSIBLE PERSON Knowledge Center/Rhea Stone 19b. TELEPHONE NUMBER (Include area code) 703-824-2110 Standard Form 298 (Rev. 8/98) Prescribed bv ANSI Sid 239.18 Contents Preliminary note: Development and commercial deployment of small modular reactors
Statement of Work Electrical Energy Storage System Installation at Sandia National Laboratories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schenkman, Benjamin L.
2017-03-01
Sandia is seeking to procure a 1 MWh energy storage system. It will be installed at the existing Energy Storage Test Pad, which is located at Sandia National Laboratories in Albuquerque, New Mexico. This energy storage system will be a daily operational system, but will also be used as a tool in our Research and development work. The system will be part of a showcase of Sandia distributed energy technologies viewed by many distinguished delegates.
24 CFR 3286.813 - Inclusion in state plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...
24 CFR 3286.813 - Inclusion in state plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...
24 CFR 3286.813 - Inclusion in state plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...
24 CFR 3286.813 - Inclusion in state plan.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...
24 CFR 3286.813 - Inclusion in state plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Inclusion in state plan. 3286.813 Section 3286.813 Housing and Urban Development Regulations Relating to Housing and Urban Development... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM State Programs § 3286.813 Inclusion in state...
24 CFR 3285.704 - Telephone and cable TV.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Electrical Systems and Equipment § 3285... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Telephone and cable TV. 3285.704 Section 3285.704 Housing and Urban Development Regulations Relating to Housing and Urban Development...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ardani, Kristen; O'Shaughnessy, Eric; Fu, Ran
2016-12-01
In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quartermore » of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.« less
Investigation of tracking systems properties in CAVE-type virtual reality systems
NASA Astrophysics Data System (ADS)
Szymaniak, Magda; Mazikowski, Adam; Meironke, Michał
2017-08-01
In recent years, many scientific and industrial centers in the world developed a virtual reality systems or laboratories. One of the most advanced solutions are Immersive 3D Visualization Lab (I3DVL), a CAVE-type (Cave Automatic Virtual Environment) laboratory. It contains two CAVE-type installations: six-screen installation arranged in a form of a cube, and four-screen installation, a simplified version of the previous one. The user feeling of "immersion" and interaction with virtual world depend on many factors, in particular on the accuracy of the tracking system of the user. In this paper properties of the tracking systems applied in I3DVL was investigated. For analysis two parameters were selected: the accuracy of the tracking system and the range of detection of markers by the tracking system in space of the CAVE. Measurements of system accuracy were performed for six-screen installation, equipped with four tracking cameras for three axes: X, Y, Z. Rotation around the Y axis was also analyzed. Measured tracking system shows good linear and rotating accuracy. The biggest issue was the range of the monitoring of markers inside the CAVE. It turned out, that the tracking system lose sight of the markers in the corners of the installation. For comparison, for a simplified version of CAVE (four-screen installation), equipped with eight tracking cameras, this problem was not occur. Obtained results will allow for improvement of cave quality.
Owusu-Edusei, K; Biddle, E A
2007-04-01
Cost-effective rollover protective structures (CROPS) are less costly model-specific rollover protective structure (ROPS) retrofits that are being developed and evaluated with the hope of increasing adoption and eventually preventing or mitigating injuries due to tractor overturns. A dynamic cohort of the estimated retrofittable non-ROPS tractors (accounting for attrition due to aging) was tracked over a 20-year period to determine the expected costs, as well as the expected number of fatal and non-fatal injuries resulting from tractor overturns. Two alternatives were tracked: No-ROPS and Install-CROPS. For a starting cohort size of 1,065,164 (an estimate for the year 2004), the Install-CROPS option prevented an estimated total of 878 (192 fatal and 686 non-fatal) injuries over the 20-year period. Expected costs were $513 million (cost of installing CROPS on all the non-ROPS tractors plus cost of the associated injuries) and $284 million (cost of injuries resulting from the No-ROPS option) over the same time period. Thus, the net cost per injury prevented was $260,820. When the cost of intervention ($1000 for purchasing, shipping, and installation of existing ROPS retrofit) was used in the analysis, the cost-effectiveness ratio was $927,000 per injury prevented over the 20-year period. Thus, installing CROPS instead of existing ROPS retrofits improved the cost-effectiveness ratio substantially, with a 72% reduction in the net cost per injury prevented.
General atomics low speed Maglev technology development program (Supplemental #3)
DOT National Transportation Integrated Search
2005-05-01
This report details accomplishments of the Low Speed Maglev Technology Development Program, Supplemental #3. The 4 major tasks included: guideway foundation construction, fabrication and installation of 7 guideway modules, system integration and test...
Utility accommodation and conflict tracker (UACT) installation and configuration manual.
DOT National Transportation Integrated Search
2009-02-01
Project 0-5475 performed a comprehensive analysis of utility conflict data/information flows between utility : accommodation stakeholders in the Texas Department of Transportation project development process, : developed data models to accommodate wo...
Design description report for a photovoltaic power system for a remote satellite earth terminal
NASA Technical Reports Server (NTRS)
Marshall, N. A.; Naff, G. J.
1987-01-01
A photovoltaic (PV) power system has been installed as an adjunct to an agricultural school at Wawatobi on the large northern island of the Republic of Indonesia. Its purpose is to provide power for a satellite earth station and a classroom. The renewable energy developed supports the video and audio teleconferencing systems as well as the facility at large. The ground station may later be used to provide telephone service. The installation was made in support of the Agency for International Development's Rural Satellite Program, whose purpose is to demonstrate the use of satellite communications for rural development assistance applications. The objective of this particular PV power system is to demonstrate the suitability of a hybrid PV engine-generator configuration for remote satellite earth stations.
Counting Jobs and Economic Impacts from Distributed Wind in the United States (Poster)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tegen, S.
This conference poster describes the distributed wind Jobs and Economic Development Imapcts (JEDI) model. The goal of this work is to provide a model that estimates jobs and other economic effects associated with the domestic distributed wind industry. The distributed wind JEDI model is a free input-output model that estimates employment and other impacts resulting from an investment in distributed wind installations. Default inputs are from installers and industry experts and are based on existing projects. User input can be minimal (use defaults) or very detailed for more precise results. JEDI can help evaluate potential scenarios, current or future; informmore » stakeholders and decision-makers; assist businesses in evaluating economic development impacts and estimating jobs; assist government organizations with planning and evaluating and developing communities.« less
Development of an innovative solar absorber
NASA Astrophysics Data System (ADS)
Goodchild, Gavin
Solar thermal systems have great potential to replace or reduce the dependence of conventional fossil fuel based heating technologies required for space and water heating. Specifically solar domestic hot water systems can contribute 50-75% of the annual thermal load. To date residential users have been slow to purchase and install systems, primarily due to the large monetary investment required to purchase and install a system. Recent innovations in materials design and manufacturing techniques, offer opportunities for the development of absorber plate designs that have the potential to reduce cost, increase efficiency and reduce payback periods. Consequently, this design study was conducted in conjunction with industrial partners to develop an improved absorber based on roll bond manufacturing that can be produced at reduced cost with comparable or greater thermal efficiency.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ginn, J.W.
1995-11-01
The photovoltaic systems test facility at Sandia National Laboratories is evaluating the performance of large hybrid power-processing centers (PPC`s). The primary customer for this work has been the Strategic Environmental Research and Development Program (SERDP) of the Department of Defense. One of the goals of SERDP is to develop power-processing hardware to be used in photovoltaic-hybrid power systems at remote military installations. Power for these installations is presently provided by engine-generators. Currently, hardware for twelve such sites is in various stages of procurement. The subject of this talk is testing of the PPC for the first SERDP system, a 300-kWmore » unit for Superior Valley, a US Navy site at China Lake, California.« less
NASA Astrophysics Data System (ADS)
Razak, K. Abdul; Othman, M. I. H.; Mat Yusuf, S.; Fuad, M. F. I. Ahmad; yahaya, Effah
2018-05-01
Oil and gas today being developed at different water depth characterized as shallow, deep and ultra-deep waters. Among the major components involved during the offshore installation is pipelines. Pipelines are a transportation method of material through a pipe. In oil and gas industry, pipeline come from a bunch of line pipe that welded together to become a long pipeline and can be divided into two which is gas pipeline and oil pipeline. In order to perform pipeline installation, we need pipe laying barge or pipe laying vessel. However, pipe laying vessel can be divided into two types: S-lay vessel and J-lay vessel. The function of pipe lay vessel is not only to perform pipeline installation. It also performed installation of umbilical or electrical cables. In the simple words, pipe lay vessel is performing the installation of subsea in all the connecting infrastructures. Besides that, the installation processes of pipelines require special focus to make the installation succeed. For instance, the heavy pipelines may exceed the lay vessel’s tension capacities in certain kind of water depth. Pipeline have their own characteristic and we can group it or differentiate it by certain parameters such as grade of material, type of material, size of diameter, size of wall thickness and the strength. For instances, wall thickness parameter studies indicate that if use the higher steel grade of the pipelines will have a significant contribution in pipeline wall thickness reduction. When running the process of pipe lay, water depth is the most critical thing that we need to monitor and concern about because of course we cannot control the water depth but we can control the characteristic of the pipe like apply line pipe that have wall thickness suitable with current water depth in order to avoid failure during the installation. This research will analyse whether the pipeline parameter meet the requirements limit and minimum yield stress. It will overlook to simulate pipe grade API 5L X60 which size from 8 to 20mm thickness with a water depth of 50 to 300m. Result shown that pipeline installation will fail from the wall thickness of 18mm onwards since it has been passed the critical yield percentage.
Effect of Component Failures on Economics of Distributed Photovoltaic Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lubin, Barry T.
2012-02-02
This report describes an applied research program to assess the realistic costs of grid connected photovoltaic (PV) installations. A Board of Advisors was assembled that included management from the regional electric power utilities, as well as other participants from companies that work in the electric power industry. Although the program started with the intention of addressing effective load carrying capacity (ELCC) for utility-owned photovoltaic installations, results from the literature study and recommendations from the Board of Advisors led investigators to the conclusion that obtaining effective data for this analysis would be difficult, if not impossible. The effort was then re-focusedmore » on assessing the realistic costs and economic valuations of grid-connected PV installations. The 17 kW PV installation on the University of Hartford's Lincoln Theater was used as one source of actual data. The change in objective required a more technically oriented group. The re-organized working group (changes made due to the need for more technically oriented participants) made site visits to medium-sized PV installations in Connecticut with the objective of developing sources of operating histories. An extensive literature review helped to focus efforts in several technical and economic subjects. The objective of determining the consequences of component failures on both generation and economic returns required three analyses. The first was a Monte-Carlo-based simulation model for failure occurrences and the resulting downtime. Published failure data, though limited, was used to verify the results. A second model was developed to predict the reduction in or loss of electrical generation related to the downtime due to these failures. Finally, a comprehensive economic analysis, including these failures, was developed to determine realistic net present values of installed PV arrays. Two types of societal benefits were explored, with quantitative valuations developed for both. Some societal benefits associated with financial benefits to the utility of having a distributed generation capacity that is not fossil-fuel based have been included into the economic models. Also included and quantified in the models are several benefits to society more generally: job creation and some estimates of benefits from avoiding greenhouse emissions. PV system failures result in a lowering of the economic values of a grid-connected system, but this turned out to be a surprisingly small effect on the overall economics. The most significant benefit noted resulted from including the societal benefits accrued to the utility. This provided a marked increase in the valuations of the array and made the overall value proposition a financially attractive one, in that net present values exceeded installation costs. These results indicate that the Department of Energy and state regulatory bodies should consider focusing on societal benefits that create economic value for the utility, confirm these quantitative values, and work to have them accepted by the utilities and reflected in the rate structures for power obtained from grid-connected arrays. Understanding and applying the economic benefits evident in this work can significantly improve the business case for grid-connected PV installations. This work also indicates that the societal benefits to the population are real and defensible, but not nearly as easy to justify in a business case as are the benefits that accrue directly to the utility.« less
NASA Astrophysics Data System (ADS)
Gusev, E. V.; Mukhametzyanov, Z. R.; Razyapov, R. V.
2017-11-01
The problems of the existing methods for the determination of combining and technologically interlinked construction processes and activities are considered under the modern construction conditions of various facilities. The necessity to identify common parameters that characterize the interaction nature of all the technology-related construction and installation processes and activities is shown. The research of the technologies of construction and installation processes for buildings and structures with the goal of determining a common parameter for evaluating the relationship between technologically interconnected processes and construction works are conducted. The result of this research was to identify the quantitative evaluation of interaction construction and installation processes and activities in a minimum technologically necessary volume of the previous process allowing one to plan and organize the execution of a subsequent technologically interconnected process. The quantitative evaluation is used as the basis for the calculation of the optimum range of the combination of processes and activities. The calculation method is based on the use of the graph theory. The authors applied a generic characterization parameter to reveal the technological links between construction and installation processes, and the proposed technique has adaptive properties which are key for wide use in organizational decisions forming. The article provides a written practical significance of the developed technique.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, W.J.; Liddle, S.K.
1986-09-01
The primary objectives of this project were to collect and analyze groundwater, surface water, and sediment samples and to perform an initial characterization of the hydrogeochemical regime at potential contamination sites on Shaw Air Force Base near Sumter, South Carolina. This study constituted Phase II of the U.S. Air Force Installation Restoration Program (IRP). Five potential sources of groundwater pollution were studied. The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of groundwater monitoring wells, and the analyses of soil, surface water, and groundwater samples. Also used in the study were field measurements ofmore » water quality, water-level measurements site observations, published hydrogeologic data and Shaw AFB documents.« less
Design and installation of a ferromagnetic wall in tokamak geometry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, P. E., E-mail: peh2109@columbia.edu; Levesque, J. P.; Rivera, N.
Low-activation ferritic steels are leading material candidates for use in next-generation fusion development experiments such as a prospective component test facility and DEMO power reactor. Understanding the interaction of plasmas with a ferromagnetic wall will provide crucial physics for these facilities. In order to study ferromagnetic effects in toroidal geometry, a ferritic wall upgrade was designed and installed in the High Beta Tokamak–Extended Pulse (HBT-EP). Several material options were investigated based on conductivity, magnetic permeability, vacuum compatibility, and other criteria, and the material of choice (high-cobalt steel) is characterized. Installation was accomplished quickly, with minimal impact on existing diagnostics andmore » overall machine performance, and initial results demonstrate the effects of the ferritic wall on plasma stability.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doyle, Chris; Loomans, Len; Truitt, Andrew
2015-12-29
This Best Practices in Commercial and Industrial Solar Photovoltaic System Installation Guide is the second of a series of guides designed to standardize and improve solar asset transparency for investors and rating agencies, provide an industry framework for quality management, and reduce transaction costs in the solar asset securitization process. The Best Practices in C&I PV System Installation Guide is intended to outline the minimum requirements for commercial and industrial solar project developments. Adherence to the guide is voluntary. Providers that adhere to the guide are responsible for self-certifying that they have fulfilled the guide requirements. Investors and rating agenciesmore » should verify compliance.« less
Orion Service Module Umbilical (OSMU) Installation
2017-03-16
Construction workers assist as a crane and rigging are used to position the Orion Service Module Umbilical (OSMU) for installation high up on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.
Renewable Energy in Fitness Centers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.
2009-09-30
All military installations have goals for implementing renewable energy projects, but not all have abundant solar energy or have massive feedstock for a large biomass plant. They must build up their renewable portfolio one project at it a time where they make the most sense – most of the time through small projects on specific buildings. During the last few years, Pacific Northwest National Laboratory (PNNL) provided project support to Army Installation Management Command Southeast Region (IMCOM-Southeast) installations. One of the building types visited, the physical fitness center (PFC), almost always yield project ideas. The building lends itself to amore » number of different technologies, and the high traffic nature is the perfect place to craft an educational message for users and demonstrate an installation’s commitment to sustainable energy development.« less
Flutter Analysis of the Shuttle Tile Overlay Repair Concept
NASA Technical Reports Server (NTRS)
Bey, Kim S.; Scott, Robert C.; Bartels, Robert E.; Waters, William A.; Chen, Roger
2007-01-01
The Space Shuttle tile overlay repair concept, developed at the NASA Johnson Space Center, is designed for on-orbit installation over an area of damaged tile to permit safe re-entry. The thin flexible plate is placed over the damaged area and secured to tile at discreet points around its perimeter. A series of flutter analyses were performed to determine if the onset of flutter met the required safety margins. Normal vibration modes of the panel, obtained from a simplified structural analysis of the installed concept, were combined with a series of aerodynamic analyses of increasing levels of fidelity in terms of modeling the flow physics to determine the onset of flutter. Results from these analyses indicate that it is unlikely that the overlay installed at body point 1800 will flutter during re-entry.
Donovan, Carl; Harwood, John; King, Stephanie; Booth, Cormac; Caneco, Bruno; Walker, Cameron
2016-01-01
There are many developments for offshore renewable energy around the United Kingdom whose installation typically produces large amounts of far-reaching noise, potentially disturbing many marine mammals. The potential to affect the favorable conservation status of many species means extensive environmental impact assessment requirements for the licensing of such installation activities. Quantification of such complex risk problems is difficult and much of the key information is not readily available. Expert elicitation methods can be employed in such pressing cases. We describe the methodology used in an expert elicitation study conducted in the United Kingdom for combining expert opinions based on statistical distributions and copula-like methods.
NASA Astrophysics Data System (ADS)
Ivanyushenkov, Y.; Harkay, K.; Borland, M.; Dejus, R.; Dooling, J.; Doose, C.; Emery, L.; Fuerst, J.; Gagliano, J.; Hasse, Q.; Kasa, M.; Kenesei, P.; Sajaev, V.; Schroeder, K.; Sereno, N.; Shastri, S.; Shiroyanagi, Y.; Skiadopoulos, D.; Smith, M.; Sun, X.; Trakhtenberg, E.; Xiao, A.; Zholents, A.; Gluskin, E.
2017-10-01
Development of superconducting undulators continues at the Advanced Photon Source (APS). Two years after successful installation and commissioning of the first relatively short superconducting undulator "SCU0" in Sector 6 of the APS storage ring, the second 1.1-m-long superconducting undulator "SCU1" was installed in Sector 1 of the APS. The device has been in user operation since its commissioning in May 2015. This paper describes the magnetic and cryogenic design of the SCU1 together with the results of stand-alone cold tests. The SCU1's magnetic and cryogenic performance as well as its operating experience in the APS storage ring are also presented.
NASA Technical Reports Server (NTRS)
Anderson, Bernhard H.; Gibb, James
1992-01-01
A study is presented to demonstrate that the Reduced Navier-Stokes code RNS3D can be employed effectively to develop a vortex generator installation that minimizes engine face circumferential distortion by controlling the development of secondary flow. The necessary computing times are small enough to show that similar studies are feasible within an analysis-design environment with all its constraints of costs and time. This study establishes the nature of the performance enhancements that can be realized with vortex flow control, and indicates a set of aerodynamic properties that can be utilized to arrive at a successful vortex generator installation design.
Egypt`s first subsea completion: A Gulf of Suez case history
DOE Office of Scientific and Technical Information (OSTI.GOV)
El Hawary, A.; Hoffman, J.G.
1996-06-01
A case history of the Gulf of Suez Petroleum Co.`s (Gupco) first subsea completion is provided. The first completion was for Well GS 373-2, a previously drilled and tested exploration well located in the south portion of the gulf of Suez. Subsea technology was used to economically justify development of this one-well marginal field, which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low-cost subsea tree was used to capture the resources. In the Gulf of Suez, many fields have been discovered but have not been developed because of low reserves.more » These marginal projects can have a profound impact on the revenue and shareholder value if an economic method is used to exploit these opportunities. Platform installation was not feasible because of reserve size, hence the well has remained abandoned until recently. This paper presents a summarized look at subsea completion technology. The cost comparison of traditional development methods will be made, given the local cost structure in Egypt. The application of this technology has some limitations and constraints that will be discussed in the paper. Furthermore, the actual field installation of Egypt`s first subsea tree will be summarized. Also included is a discussion on simple remote controls and offshore installation operations.« less
2009-06-01
energy demand is projected to outgrow afford- able supplies even after accounting for the impact of anticipated energy efficiency and management ... management . The purpose of that change would be to facilitate development of a suite of ultra-low- energy solutions that would approach NZE usage by...enabling real-time op- timization of power supply, demand, and storage management for Army facilities, emplacements, or fixed installations of any
iMSRC: converting a standard automated microscope into an intelligent screening platform
Carro, Angel; Perez-Martinez, Manuel; Soriano, Joaquim; Pisano, David G.; Megias, Diego
2015-01-01
Microscopy in the context of biomedical research is demanding new tools to automatically detect and capture objects of interest. The few extant packages addressing this need, however, have enjoyed limited uptake due to complexity of use and installation. To overcome these drawbacks, we developed iMSRC, which combines ease of use and installation with high flexibility and enables applications such as rare event detection and high-resolution tissue sample screening, saving time and resources. PMID:26015081
Williams installs CBEF Cell Mechanosensing Humidifier
2016-04-01
ISS047e032018 (04/01/2016) --- NASA astronaut Jeff Williams works to install the Cell Biology Experiment Facility (CBEF) Cell Mechanosensing Humidifier. Cell Mechanosensing is a Japan Aerospace Exploration Agency (JAXA) investigation that identifies gravity sensors in skeletal muscle cells to develop countermeasures to muscle atrophy, a key space health issue. Scientists believe that the lack of mechanical stress from gravity causes tension fluctuations in the plasma membrane of skeletal muscle cells which changes the expression of key proteins and genes, and allows muscles to atrophy.
2007-08-01
on Army installations. DISCLAIMER: The contents of this report are not to be used for advertising , publication, or promotional purposes. Citation...ob- served. Driver et al. 2003 exposed house sparrow (Passer domesticus) eggs and nestlings to fog oil concentrations up to 450 mg/m3 for 30 minutes...during sensitive periods of embryonic and nestling development. That exposure did not adversely impact hatchability of house sparrow eggs or the
DESI-Detection of early-season invasives (software-installation manual and user's guide version 1.0)
Kokaly, Raymond F.
2011-01-01
This report describes a software system for detecting early-season invasive plant species, such as cheatgrass. The report includes instructions for installing the software and serves as a user's guide in processing Landsat satellite remote sensing data to map the distributions of cheatgrass and other early-season invasive plants. The software was developed for application to the semi-arid regions of southern Utah; however, the detection parameters can be altered by the user for application to other areas.
1981-01-09
CHALLENGER for an estimated period of six days. The design for the test Borehole Instrumentation Package (BIP) reentry-sub and associated handling...equipment has been completed ard hmi been submitted for vendor bid. Details of the specialized support equipment for installation on the GLOMAR CHALLENGER ...developed under the direction of the Deep Sea Drilling Project (DSDP) by the dynamically positioned drilling vessel GLOMAR CHALLENGER . Deployment of the
2017-11-10
A heavy-load transport truck carrying the Orion crew access arm nears the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The crew access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.
Sonic Onyx: Case Study of an Interactive Artwork
NASA Astrophysics Data System (ADS)
Ahmed, Salah Uddin; Jaccheri, Letizia; M'kadmi, Samir
Software supported art projects are increasing in numbers in recent years as artists are exploring how computing can be used to create new forms of live art. Interactive sound installation is one kind of art in this genre. In this article we present the development process and functional description of Sonic Onyx, an interactive sound installation. The objective is to show, through the life cycle of Sonic Onyx, how a software dependent interactive artwork involves its users and raises issues related to its interaction and functionalities.
NASA Technical Reports Server (NTRS)
Kaiser, E.
1977-01-01
The amount of nitrogen oxides introduced into the atmosphere by gas turbines is very significant in relation to the total amount of nitrogen oxide emissions produced by chemical installations and combustion engines. Turbine manufacturers are therefore working to develop combustion chambers with sufficiently low nitrogen oxide emission concentrations. Attention is given to aspects of nitrogen oxide formation in gas turbines, the parameters which determine this formation, and suitable approaches to reducing nitrogen oxide emissions.
2010-07-01
the ground source heat pump system . During installation, construction equipment would remove vegetation from the surface and disturb soil to a depth...levels of 50 to 55 dBA or higher on a daily basis. Studies specifically conducted to determine noise effects on various human activities show that about...needs to be evaluated for its potential effects on a project site and adjacent land uses. The foremost factor affecting a proposed action in terms of
1982-04-01
number) This report presents a review and evaluation of the available information on the use of physical and hydrological barriers for containment or...UNCLASSIFIED 1 $SCCuRITY CLASSIFICATION OF T.qiS *&GE When Daa Entered SUMMARY The available literature on methods for containment or diversion of ground...II. Preliminary Considerations for Installation of a Ground Water Containment or Diversion Barrier .. ... ....... ...... 13 III. Slurry-Trench Cutoff
2008-01-24
NASA Dryden technicians work on a fit-check mockup in preparation for systems installation work on an Orion boilerplate crew capsule for launch abort testing. A mockup Orion crew module has been constructed by NASA Dryden Flight Research Center's Fabrication Branch. The mockup is being used to develop integration procedures for avionics and instrumentation in advance of the arrival of the first abort flight test article.
2008-01-24
NASA Dryden technicians take measurements inside a fit-check mockup for prior to systems installation on a boilerplate Orion launch abort test crew capsule. A mockup Orion crew module has been constructed by NASA Dryden Flight Research Center's Fabrication Branch. The mockup is being used to develop integration procedures for avionics and instrumentation in advance of the arrival of the first abort flight test article.
Multizone subsea completions in the Dai Hung field, Vietnam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lay, K.R.
1996-09-01
The early production phase of the Dai Hung field development resulted in the drilling and completion of five subsea wells. Because of the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. The downhole completion designs used equipment that was primarily of existing proven design and downhole equipment installation was successfully achieved in a single trip. Ongoing reservoir management will be aided by the use of a subsea wireline system to facilitate data acquisition.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false After sale. 3286.605 Section 3286.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued....605 After sale. (a) Tracking installation information. The retailer is responsible for providing to...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false After sale. 3286.605 Section 3286.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued....605 After sale. (a) Tracking installation information. The retailer is responsible for providing to...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false After sale. 3286.605 Section 3286.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued....605 After sale. (a) Tracking installation information. The retailer is responsible for providing to...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false After sale. 3286.605 Section 3286.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued....605 After sale. (a) Tracking installation information. The retailer is responsible for providing to...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false After sale. 3286.605 Section 3286.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued....605 After sale. (a) Tracking installation information. The retailer is responsible for providing to...
Techniques for Embedding Instrumentation in Pressure Vessel Test Articles
NASA Technical Reports Server (NTRS)
Cornelius, Michael
2006-01-01
Many interesting structural and thermal events occur in materials that are housed within a surrounding pressure vessel. In order to measure the environment during these events and explore their causes instrumentation must be installed on or in the material. Transducers can be selected that are small enough to be embedded within the test material but these instruments must interface with an external system in order to apply excitation voltages and output the desired data. The methods for installing the instrumentation and creating an interface are complicated when the material is located in a case or housing containing high pressures and hot gases. Installation techniques for overcoming some of these difficulties were developed while testing a series of small-scale solid propellant and hybrid rocket motors at Marshall Space Flight Center. These techniques have potential applications in other test articles where data are acquired from materials that require containment due to the severe environment encountered during the test process. This severe environment could include high pressure, hot gases, or ionized atmospheres. The development of these techniques, problems encountered, and the lessons learned from the ongoing testing process are summarized.
An installed nacelle design code using a multiblock Euler solver. Volume 1: Theory document
NASA Technical Reports Server (NTRS)
Chen, H. C.
1992-01-01
An efficient multiblock Euler design code was developed for designing a nacelle installed on geometrically complex airplane configurations. This approach employed a design driver based on a direct iterative surface curvature method developed at LaRC. A general multiblock Euler flow solver was used for computing flow around complex geometries. The flow solver used a finite-volume formulation with explicit time-stepping to solve the Euler Equations. It used a multiblock version of the multigrid method to accelerate the convergence of the calculations. The design driver successively updated the surface geometry to reduce the difference between the computed and target pressure distributions. In the flow solver, the change in surface geometry was simulated by applying surface transpiration boundary conditions to avoid repeated grid generation during design iterations. Smoothness of the designed surface was ensured by alternate application of streamwise and circumferential smoothings. The capability and efficiency of the code was demonstrated through the design of both an isolated nacelle and an installed nacelle at various flow conditions. Information on the execution of the computer program is provided in volume 2.
Preliminary Statistics from the NASA Alphasat Beacon Receiver in Milan, Italy
NASA Technical Reports Server (NTRS)
Zemba, Michael J.; Nessel, James A.; Morse, Jacquelynne R.
2015-01-01
NASA Glenn Research Center (GRC) and the Politecnico di Milano (POLIMI) have initiated a joint propagation campaign within the framework of the Alphasat propagation experiment to characterize rain attenuation, scintillation, and gaseous absorption effects of the atmosphere in the 40 GHz band. NASA GRC has developed and installed a KQ-band (20-40 GHz) beacon receiver at the POLIMI campus in Milan, Italy, which receives the 20-40 GHz signals broadcast from the Alphasat Aldo Paraboni TDP5 beacon payload. The primary goal of these measurements is to develop a physical model to improve predictions of communications systems performance within the Q-band. Herein, we provide an overview of the design and data calibration procedure, and present 6 months of preliminary statistics of the NASA propagation terminal, which has been installed and operating in Milan since May 2014. The Q-band receiver has demonstrated a dynamic range of 40 dB at an 8-Hz sampling rate. A weather station with an optical disdrometer is also installed to characterize rain drop size distribution for correlation with physical based models
Preliminary Statistics from the NASA Alphasat Beacon Receiver in Milan, Italy
NASA Technical Reports Server (NTRS)
Nessel, James; Zemba, Michael; Morse, Jacquelynne; Luini, Lorenzo; Riva, Carlo
2015-01-01
NASA Glenn Research Center (GRC) and the Politecnico di Milano (POLIMI) have initiated a joint propagation campaign within the framework of the Alphasat propagation experiment to characterize rain attenuation, scintillation, and gaseous absorption effects of the atmosphere in the 40 gigahertz band. NASA GRC has developed and installed a K/Q-band (20/40 gigahertz) beacon receiver at the POLIMI campus in Milan, Italy, which receives the 20/40 gigahertz signals broadcast from the Alphasat Aldo Paraboni TDP no. 5 beacon payload. The primary goal of these measurements is to develop a physical model to improve predictions of communications systems performance within the Q-band. Herein, we provide an overview of the design and data calibration procedure, and present 6 months of preliminary statistics of the NASA propagation terminal, which has been installed and operating in Milan since May 2014. The Q-band receiver has demonstrated a dynamic range of 40 decibels at an 8-hertz sampling rate. A weather station with an optical disdrometer is also installed to characterize rain drop size distribution for correlation with physical based models.
Sand-control completion design, installation, and performance in high-rate gas wells
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burton, R.C.; Boggan, S.A.
1998-09-01
The Jupiter fields consist of a number of separate Rotliegendes gas reservoirs located approximately 90 miles off the Lincolnshire coast of the UK. The fields that make up Jupiter are Ganymede, Calisto, Europa, Sinope, and Thebe. Originally discovered in 1970, initial appraisal wells indicated poor reservoir properties and low deliverabilities. Development was postponed until a reappraisal of the area in the 1990`s indicated significant upside potential. The initial phase of the Jupiter development plan called for development of Ganymede and Calisto fields, with subsequent phases tying in Europa and Thebe. Initial development planning indicated a need for high field deliverabilitymore » at low capital cost to meet economic targets. A small number of high-rate-potential wells were to be used to deplete the reservoir. Ganymede would be developed by use of a 10-slot platform and Calisto would be developed subsea and tied back to the Ganymede platform. The paper discusses the reservoir, formation assessment, productivity design, drilling design, screen installation, and completion performance.« less
A turbulent plane jet impinging nearby and far from a flat plate
NASA Astrophysics Data System (ADS)
Maurel, S.; Solliec, C.
Plane air jets presenting an impact find applications in many industrial devices. They can be found in installations of heating, cooling or drying, cleaning, pulverization, or containment of polluted environments. Other applications can be found in the ventilation of buildings. The correct design of these kinds of installations requires thorough knowledge of the structure of the jet from the cinematic point of view. With this intention a test bench with variable geometry was developed. Then, using laser Doppler velocimetry (LDV) and particle image velocimetry (PIV), it is possible to analyze the development of the jet for various geometrical and cinematic configurations. It appears that the development of the jet is independent of the Reynolds number, and the velocity decrease in the developed and impinging zones can be characterized by using very simple laws. Furthermore, by PIV visualization of the impinging zone, it has been possible to highlight the causes of mass transfer through the jet.
Geothermal development in the Philippines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elizagaque, R.F.; Tolentino, B.S.
1982-06-01
The development of geothermal resources and energy in the Philippines is discussed. Philippine National Oil Company-Energy Development Corporation initiated the first semi-commercial generation of geothermal power in July 1977 with the installation of a 3MWe plant. By 1980 the country had 440 MWe on line at Mak-Ban and Tiwi. This placed the Philippines second after the US among countries using geothermal energy for power generation. Before the end of 1981, PNOC-EDC added 6 additional MWe of geothermal power generating capacity to increase the total to 446 MWe. As part of the five-year National Energy Development Programme covering the period 1981-1985,more » additional power plants will be installed in various project areas to increase the share of geothermal power generation from the present 9.8% to 18.6% of the nationwide power-generation total, or the equivalent of 16.6 million barrels of oil per year. (MJF)« less
Source-term development for a contaminant plume for use by multimedia risk assessment models
NASA Astrophysics Data System (ADS)
Whelan, Gene; McDonald, John P.; Taira, Randal Y.; Gnanapragasam, Emmanuel K.; Yu, Charley; Lew, Christine S.; Mills, William B.
2000-02-01
Multimedia modelers from the US Environmental Protection Agency (EPA) and US Department of Energy (DOE) are collaborating to conduct a comprehensive and quantitative benchmarking analysis of four intermedia models: MEPAS, MMSOILS, PRESTO, and RESRAD. These models represent typical analytically based tools that are used in human-risk and endangerment assessments at installations containing radioactive and hazardous contaminants. The objective is to demonstrate an approach for developing an adequate source term by simplifying an existing, real-world, 90Sr plume at DOE's Hanford installation in Richland, WA, for use in a multimedia benchmarking exercise between MEPAS, MMSOILS, PRESTO, and RESRAD. Source characteristics and a release mechanism are developed and described; also described is a typical process and procedure that an analyst would follow in developing a source term for using this class of analytical tool in a preliminary assessment.
On-line remote monitoring of radioactive waste repositories
NASA Astrophysics Data System (ADS)
Calì, Claudio; Cosentino, Luigi; Litrico, Pietro; Pappalardo, Alfio; Scirè, Carlotta; Scirè, Sergio; Vecchio, Gianfranco; Finocchiaro, Paolo; Alfieri, Severino; Mariani, Annamaria
2014-12-01
A low-cost array of modular sensors for online monitoring of radioactive waste was developed at INFN-LNS. We implemented a new kind of gamma counter, based on Silicon PhotoMultipliers and scintillating fibers, that behaves like a cheap scintillating Geiger-Muller counter. It can be placed in shape of a fine grid around each single waste drum in a repository. Front-end electronics and an FPGA-based counting system were developed to handle the field data, also implementing data transmission, a graphical user interface and a data storage system. A test of four sensors in a real radwaste storage site was performed with promising results. Following the tests an agreement was signed between INFN and Sogin for the joint development and installation of a prototype DMNR (Detector Mesh for Nuclear Repository) system inside the Garigliano radwaste repository in Sessa Aurunca (CE, Italy). Such a development is currently under way, with the installation foreseen within 2014.
Bråtveit, Magne; Steinsvåg, Kjersti; Lie, Stein Atle; Moen, Bente E
2009-11-01
The objective of this study was to develop regression models to predict concentrations of oil mist and oil vapor in the workplace atmosphere in the shale shaker area of offshore drilling installations. Collection of monitoring reports of oil mist and oil vapor in the mud handling areas of offshore drilling installations was done during visits to eight oil companies and five drilling contractors. A questionnaire was sent to the rig owners requesting information about technical design of the shaker area. Linear mixed-effects models were developed using concentration of oil mist or oil vapor measured by stationary sampling as dependent variables, drilling installation as random effect, and potential determinants related to process technical parameters and technical design of the shale shaker area as fixed effects. The dataset comprised stationary measurements of oil mist (n = 464) and oil vapor (n = 462) from the period 1998 to 2004. The arithmetic mean concentrations of oil mist and oil vapor were 3.89 mg/m(3) and 39.7 mg/m(3), respectively. The air concentration models including significant determinants such as viscosity of base oil, mud temperature, well section, type of rig, localization of shaker, mechanical air supply, air grids in outer wall, air curtain in front of shakers, and season explained 35% and 17% of the total variance in oil vapor and oil mist, respectively. The developed models could be used to indicate what impact differences in technical design and changes in process parameters have on air concentrations of oil mist and oil vapor. Thus, the models will be helpful in planning control measures to reduce the potential for occupational exposure.
Development of a Post-Installed Deepwater Monitoring System
NASA Technical Reports Server (NTRS)
Seaman, C.; Brower, D. V.; Tang, H.; Le, S.
2015-01-01
A monitoring system that can be deployed on already existing deep water risers and flowlines has been developed. This paper describes the design concepts and testing that was performed in developing the monitoring system. A major challenge of a post-installed instrumentation system is to ensure adequate coupling is achieved between the instruments and the riser or flowline. This work investigates the sensor coupling for pipelines that are suspended in both the water column (from topside platform to the seabed) and for those that are located directly on the seabed. These different environments have resulted in two sensor attachment methods: (1) subsea adhesive sensor clamp design and (2) a friction surface sensor attachment method. This paper presents the adhesive attachment method. The monitoring elements consist of fiber optic sensors that are encased in a polyurethane clamp. With a subsea adhesive, the clamp can be installed by divers in shallow depths or by use of an ROV for deeper applications. The NASA Johnson Space Center was initially involved in the selection and testing of subsea adhesives. It was determined that up to 75 percent of the bonding strength could be achieved with the adhesive from optimal dry bonding versus bonding in submerged sea water environments. The next phase of the study involved the design, fabrication, and testing of several prototype clamps that contained the fiber optic sensors. A mold was produced by NASA using 3-D printing methods that allowed the fabrication of subscale test articles that would accommodate 4-inch and 8-inch diameter pipes. The clamps were installed with adhesive in a "wet" environment on the pipe test articles and tested in the NASA Structures Test Laboratory. The tension/compression and bending tests showed that the prototype sensor clamps achieved good coupling, and could provide high quality strain measurement for active monitoring.
Progress on the Development of the Nb 3Sn 11T Dipole for the High Luminosity Upgrade of LHC
Savary, Frederic; Bajko, Marta; Bordini, Bernardo; ...
2017-02-08
The high-luminosity large hadron collider (LHC) project at CERN entered into the production phase in October 2015 after the completion of the design study phase. In the meantime, the development of the 11 T dipole needed for the upgrade of the collimation system of the machine made significant progress with very good performance of the first two-in-one magnet model of 2-m length made at CERN. The 11 T dipole, which is more powerful than the current main dipoles of LHC, can be made shorter with an equivalent integrated field. This will allow creating space for the installation of additional collimatorsmore » in specific locations of the dispersion suppressor regions. Following tests carried out during heavy ions runs of LHC in the end of 2015, and a more recent review of the project budget, the installation plan for the 11 T dipole was revised. Consequently, one 11 T dipole full assembly containing two 11 T dipoles of 5.5-m length will be installed on either side of interaction point 7. These two units shall be installed during the long shutdown 2 in years 2019-2020. After a brief reminder on the design features of the magnet, this paper describes the current status of the development activities, in particular the short model programme and the construction of the first full scale prototype at CERN. Finally, critical operations such as the reaction treatment and the coil impregnation are discussed, the quench performance tests results of the two-in-one model are reviewed and finally, the plan toward the production for the long shut down 2 is described.« less
Kenney, Terry A.; McKinney, Tim S.
2006-01-01
Unique bridge scour mitigation designs using concrete A-Jacks were developed by the Utah Department of Transportation and installed at the Colorado River Bridge at State Road 191 and the Green River Bridge at State Road 19. The U.S. Geological Survey monitored stream reaches at these sites by collecting streambed-topography and water-velocity data from 2003 through 2005. These data were acquired annually from a moving boat with an acoustic Doppler current profiler and a differential global positioning system. Raw unordered data were processed and readied for interpolation into organized datasets with DopplerMacros, a set of computer programs. Processed streambed topography data were geostatistically interpolated by using Ordinary Kriging, and inverse distance weighting interpolation was used in the development of the two-dimensional velocity datasets. These organized datasets of topography and velocity were developed for each survey of the two bridge sites. A comparison of the riverbed topography data for each survey was done. An increase in bed elevation related to the installation of the A-Jacks scour countermeasures is evident at the Colorado River Bridge at State Road 191. The three topographic datasets acquired after the installation at the Green River Bridge at State Road 19 show few changes.
NASA Astrophysics Data System (ADS)
El Hattab, M. H.; Vernon, D.; Mijic, A.
2017-12-01
Low impact development practices (LID) are deemed to have a synergetic effect in mitigating urban storm water flooding. Designing and implementing effective LID practices require reliable real-life data about their performance in different applications; however, there are limited studies providing such data. In this study an innovative micro-monitoring system to assess the performance of porous pavement and rain gardens as retrofitting technologies was developed. Three pilot streets in London, UK were selected as part of Thames Water Utilities Limited's Counters Creek scheme. The system includes a V-notch weir installed at the outlet of each LID device to provide an accurate and reliable quantification over a wide range of discharges. In addition to, a low flow sensor installed downstream of the V-notch to cross-check the readings. Having a flow survey time-series of the pre-retrofitting conditions from the study streets, extensive laboratory calibrations under different flow conditions depicting the exact site conditions were performed prior to installing the devices in the field. The micro-monitoring system is well suited for high-resolution temporal monitoring and enables accurate long-term evaluation of LID components' performance. Initial results from the field validated the robustness of the system in fulfilling its requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, J.; Mowrey, J.
1995-12-01
This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less
Analysis of energy conservation alternatives for standard Army building. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hittle, D.C.; O'Brien, R.E.; Percivall, G.S.
1983-03-01
This report describes energy conservation alternatives for five standard Army building designs. By surveying maps of major Army installations and using the Integrated Facilities System, the most popular designs were determined to be a two-company, rolling-pin-shaped barracks for enlisted personnel; a Type 64 barracks; a motor repair shop; a battalion headquarters and classroom building; and an enlisted personnel mess hall. The Building Loads Analysis and System Thermodynamics (BLAST) energy-analysis computer program was used to develop baseline energy consumption for each design based on the building descriptions and calibrated by comparison with the measured energy usage of similar buildings. Once themore » baseline was established, the BLAST program was used to study energy conservation alternatives (ECAs) which could be retrofit to the existing buildings. The ECAs included closing off air-handling units, adding storm windows, adding 2 in. (0.051 m) of exterior insulation to the walls, partially blocking the windows, adding roof insulation, putting up south overhangs, installing programmable thermostats, recovering heat from exhaust fans, installing temperature economizers, replacing lights, and installing partitions between areas of differing temperature.« less
HTS Transmission Cable System for installation in the Long Island Power Grid
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schmidt, Frank; Durand, Fabien; Maguire, James
2015-10-05
Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2more » and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.« less
Near-field sound radiation of fan tones from an installed turbofan aero-engine.
McAlpine, Alan; Gaffney, James; Kingan, Michael J
2015-09-01
The development of a distributed source model to predict fan tone noise levels of an installed turbofan aero-engine is reported. The key objective is to examine a canonical problem: how to predict the pressure field due to a distributed source located near an infinite, rigid cylinder. This canonical problem is a simple representation of an installed turbofan, where the distributed source is based on the pressure pattern generated by a spinning duct mode, and the rigid cylinder represents an aircraft fuselage. The radiation of fan tones can be modelled in terms of spinning modes. In this analysis, based on duct modes, theoretical expressions for the near-field acoustic pressures on the cylinder, or at the same locations without the cylinder, have been formulated. Simulations of the near-field acoustic pressures are compared against measurements obtained from a fan rig test. Also, the installation effect is quantified by calculating the difference in the sound pressure levels with and without the adjacent cylindrical fuselage. Results are shown for the blade passing frequency fan tone radiated at a supersonic fan operating condition.
An Analysis of Messages About Tobacco in Military Installation Newspapers
Haddock, C. Keith; Parker, L. Carrie; Taylor, Jennifer E.; Poston, Walker S.C.; Lando, Harry; Talcott, G. Wayne
2005-01-01
Objectives. We sought to gauge the relative attention that tobacco control receives in military newspapers by comparing coverage of tobacco use with that of other health topics of importance to the military. Methods. We examined tobacco-related articles and industry advertisements in 793 newspapers published during 1 year at 16 representative military installations (4 Air Force, 6 Army, 2 Marine, 4 Navy). Newspaper content was coded with a standardized coding manual developed through previous research. Results. Tobacco use received the fewest instances of coverage and the least print space in military installation newspapers of all the health topics examined. The primary “message frame” used in tobacco control articles was that smokers are putting themselves at health risk, a theme that has not been found to have a strong effect on smokers. Nearly 10% of the newspapers contained tobacco advertisements. Conclusions. Tobacco control messages are underrepresented in military installation newspapers compared with other health issues. Furthermore, military newspapers send mixed messages to military personnel by providing advertisements for tobacco while also claiming that tobacco use is harmful. PMID:16043672
The prediction of the hydrodynamic performance of tidal current turbines
NASA Astrophysics Data System (ADS)
Y Xiao, B.; Zhou, L. J.; Xiao, Y. X.; Wang, Z. W.
2013-12-01
Nowadays tidal current energy is considered to be one of the most promising alternative green energy resources and tidal current turbines are used for power generation. Prediction of the open water performance around tidal turbines is important for the reason that it can give some advice on installation and array of tidal current turbines. This paper presents numerical computations of tidal current turbines by using a numerical model which is constructed to simulate an isolated turbine. This paper aims at studying the installation of marine current turbine of which the hydro-environmental impacts influence by means of numerical simulation. Such impacts include free-stream velocity magnitude, seabed and inflow direction of velocity. The results of the open water performance prediction show that the power output and efficiency of marine current turbine varies from different marine environments. The velocity distribution should be clearly and the suitable unit installation depth and direction be clearly chosen, which can ensure the most effective strategy for energy capture before installing the marine current turbine. The findings of this paper are expected to be beneficial in developing tidal current turbines and array in the future.
Environmental Effects of Offshore Wind Development. Fiscal Year 2012 Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Copping, Andrea E.; Hanna, Luke A.; Butner, R. Scott
Potential environmental effects of offshore wind (OSW) energy projects are not well understood, and regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between OSW installations and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. To examine the environmental risks associated with OSW developments in the U.S. Pacific Northwest National Laboratory (PNNL) focused on the following four priority research areas in FY 2012: • Environmental Risk Evaluationmore » System (ERES) - Followed project developments on the two OSW projects that PNNL screened in FY 2011 for environmental consequence: Fishermen’s Energy off the coast of Atlantic City, NJ and LEEDCo. near Cleveland, OH in Lake Erie. • Tethys - Developed a smart knowledge base which houses environmental research, data and information pertaining to OSW energy: • Technical Assessment - Produced a new software to create an automated process of identifying and differentiating between flying organism such as birds and bats by using thermal imagery; and • North Atlantic Right Whales - Developed an environmental risk management system to mitigate the impacts on North Atlantic Right Whales (NARW) during installation and piledriving stages of OSW developments. By identifying and addressing the highest priority environmental risks for OSW devices and associated installations the ERES process assists project proponents, regulators, and stakeholders to engage in the most efficient and effective siting and permitting pathways.« less
32 CFR 174.9 - Economic development conveyances.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Economic development conveyances. 174.9 Section... Economic development conveyances. (a) The Secretary concerned may transfer real property and personal property to the LRA for purposes of job generation on the installation. Such a transfer is an Economic...
32 CFR 174.9 - Economic development conveyances.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 1 2011-07-01 2011-07-01 false Economic development conveyances. 174.9 Section... Economic development conveyances. (a) The Secretary concerned may transfer real property and personal property to the LRA for purposes of job generation on the installation. Such a transfer is an Economic...
Developing VTM-51 into an ASTM test method.
DOT National Transportation Integrated Search
1993-01-01
In 1980, the Virginia Transportation Research Council developed a procedure to test silt fence installations (VTM-51). The test determines the filtering efficiency (amount of soil removed) and the flow rate of a geotextile. A known concentration and ...
Citizen Hydrology and Compressed-Air Hydropower for Rural Electrification in Haiti
NASA Astrophysics Data System (ADS)
Allen, S. M.
2015-12-01
At the present time, only one in eight residents of Haiti has access to electricity. Two recent engineering and statistical innovations have the potential for vastly reducing the cost of installation of hydropower in Haiti and the rest of the developing world. The engineering innovation is that wind, solar and fluvial energy have been used to compress air for generation of electricity for only 20 per megawatt-hour, in contrast to the conventional World Bank practice of funding photovoltaic cells for 156 per megawatt-hour. The installation of hydropower requires a record of stream discharge, which is conventionally obtained by installing a gaging station that automatically monitors gage height (height of the water surface above a fixed datum). An empirical rating curve is then used to convert gage height to stream discharge. The multiple field measurements of gage height and discharge over a wide range of discharge values that are required to develop and maintain a rating curve require a manpower of hydrologic technicians that is prohibitive in remote and impoverished areas of the world. The statistical innovation is that machine learning has been applied to the USGS database of nearly four million simultaneous measurements of gage height and discharge to develop a new classification of rivers so that a rating curve can be developed solely from the stream slope, channel geometry, horizontal and vertical distances to the nearest upstream and downstream confluences, and two pairs of discharge - gage height measurements. The objective of this study is to organize local residents to monitor gage height at ten stream sites in the northern peninsula of Haiti over a one-year period in preparation for installation of hydropower at one of the sites. The necessary baseline discharge measurements and channel surveying are being carried out for conversion of gage height to discharge. Results will be reported at the meeting.
Calibration of Elasto-Magnetic Sensors on In-Service Cable-Stayed Bridges for Stress Monitoring.
Cappello, Carlo; Zonta, Daniele; Laasri, Hassan Ait; Glisic, Branko; Wang, Ming
2018-02-05
The recent developments in measurement technology have led to the installation of efficient monitoring systems on many bridges and other structures all over the world. Nowadays, more and more structures have been built and instrumented with sensors. However, calibration and installation of sensors remain challenging tasks. In this paper, we use a case study, Adige Bridge, in order to present a low-cost method for the calibration and installation of elasto-magnetic sensors on cable-stayed bridges. Elasto-magnetic sensors enable monitoring of cable stress. The sensor installation took place two years after the bridge construction. The calibration was conducted in two phases: one in the laboratory and the other one on site. In the laboratory, a sensor was built around a segment of cable that was identical to those of the cable-stayed bridge. Then, the sample was subjected to a defined tension force. The sensor response was compared with the applied load. Experimental results showed that the relationship between load and magnetic permeability does not depend on the sensor fabrication process except for an offset. The determination of this offset required in situ calibration after installation. In order to perform the in situ calibration without removing the cables from the bridge, vibration tests were carried out for the estimation of the cables' tensions. At the end of the paper, we show and discuss one year of data from the elasto-magnetic sensors. Calibration results demonstrate the simplicity of the installation of these sensors on existing bridges and new structures.
Calibration of Elasto-Magnetic Sensors on In-Service Cable-Stayed Bridges for Stress Monitoring
Ait Laasri, Hassan; Glisic, Branko; Wang, Ming
2018-01-01
The recent developments in measurement technology have led to the installation of efficient monitoring systems on many bridges and other structures all over the world. Nowadays, more and more structures have been built and instrumented with sensors. However, calibration and installation of sensors remain challenging tasks. In this paper, we use a case study, Adige Bridge, in order to present a low-cost method for the calibration and installation of elasto-magnetic sensors on cable-stayed bridges. Elasto-magnetic sensors enable monitoring of cable stress. The sensor installation took place two years after the bridge construction. The calibration was conducted in two phases: one in the laboratory and the other one on site. In the laboratory, a sensor was built around a segment of cable that was identical to those of the cable-stayed bridge. Then, the sample was subjected to a defined tension force. The sensor response was compared with the applied load. Experimental results showed that the relationship between load and magnetic permeability does not depend on the sensor fabrication process except for an offset. The determination of this offset required in situ calibration after installation. In order to perform the in situ calibration without removing the cables from the bridge, vibration tests were carried out for the estimation of the cables’ tensions. At the end of the paper, we show and discuss one year of data from the elasto-magnetic sensors. Calibration results demonstrate the simplicity of the installation of these sensors on existing bridges and new structures. PMID:29401751
Solar Adoption and Energy Consumption in the Residential Sector
NASA Astrophysics Data System (ADS)
McAllister, Joseph Andrew
This dissertation analyzes the energy consumption behavior of residential adopters of solar photovoltaic systems (solar-PV). Based on large data sets from the San Diego region that have been assembled or otherwise acquired by the author, the dissertation quantifies changes in energy consumption after solar-PV installation and determines whether certain household characteristics are correlated with such changes. In doing so, it seeks to answer two related questions: First, "Do residential solar adopters increase or decrease their electricity consumption after they install a solar-PV system?" Assuming that certain categories of residential adopters increase and others decrease, the second question is "Which residential adopters increase and which decrease their consumption and why?" The database that was used to conduct this analysis includes information about 5,243 residential systems in San Diego Gas & Electric's (SDG&E) service territory installed between January 2007 and December 2010. San Diego is a national leader in the installation of small-scale solar-electric systems, with over 12,000 systems in the region installed as of January 2012, or around 14% of the total number installed in California. The author performed detailed characterization of a significant subset of the solar installations in the San Diego region. Assembled data included technical and economic characteristics of the systems themselves; the solar companies that sold and installed them; individual customer electric utility billing data; metered PV production data for a subgroup of these solar systems; and data about the properties where the systems are located. Primarily, the author was able to conduct an electricity consumption analysis at the individual household level for 2,410 PV systems installed in SDG&E service territory between January 2007 and December 2010. This analysis was designed to detect changes in electricity consumption from the pre-solar to the post-installation period. To the extent increases are present for some solar adopters, the analysis seeks to determine whether there is a "solar rebound" effect analogous to the "rebound" or "take-back" effect that has been observed and studied within the energy efficiency literature. Similarly, to the extent that electric users may decrease overall consumption after installation of a solar system, the study seeks to explore the possibility that solar adoption is part of a continued effort towards clean energy practices more generally, such as energy efficiency and conservation. In this way, the study seeks to determine whether there is a synergistic effect between solar and decreased consumption, for solar adopters generally or for some subsets therein. The assembled data allowed testing of various hypotheses that could help explain observed changes in consumption in different households. One variable that was carefully examined was the sizing of the solar system. As part of the study, analysis of 4,355 systems was conducted to determine how each residential solar system was sized with respect to pre-installation energy consumption. Other potentially interesting or explanatory variables for which information was available include total and net costs of the solar system; age of the home; the climate zone (inland or coastal) where the home is located; the home's pre-installation energy consumption; home characteristics such as assessed value and square footage; and the identity of the solar installation contractor. Aside from extending the literature on the rebound effect to the context of home-based energy generation, this study links to the innovation diffusion literature by focusing on solar "innovators" to understand more about the characteristics that may drive behavior, or conditions under which they also adopt clean energy technologies and practices. The results have clear policy relevance with regard to the development and coordination of policies to promote integration of solar and energy efficiency. Currently several public policies are being developed at various levels of government to encourage both, based on application of the economically rational concept of the "loading order", the California policy that places energy efficiency as the state's highest priority energy resource. However, there has been little study of the interrelationships between them or how these innovations are implemented in practice. This dissertation begins to fill that gap.
Assessment of Rooftop Area in Austin Energy's Service Territory Suitable for PV Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiese, Steven M.
The objective of this project was to create a model for assessing the amount of rooftop area on commercial, industrial, institutional, and governmental buildings in Austin Energy's service area suitable for solar electric energy development and, based on this model, determine the potential installed capacity and annual energy production from solar electric installations on the rooftops of these buildings. Key questions addressed by this project were: 1.What is the aggregate rooftop area, rooftop area suitable for PV project development, and potential for PV capacity and energy production from rooftop solar photovoltaic systems on key building types in Austin Energy's servicemore » area? 2.How do the potential capacity and annual energy production from rooftop solar electric systems compare with Austin Energy's current capacity and annual energy requirements?« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gazo, F.M.
1997-12-31
The Philippine geothermal energy development is now considered in a state of maturity. After more than 20 years of geothermal experience, the total geothermal installed capacity in the Philippines reached 1,455 MW (1996) or about 12% of the total installed power plant capacity. This also enabled the Philippines to become the second largest producer of geothermal energy in the world. The country`s track record in harnessing geothermal energy is considered a revelation, as it continues with its vision of {open_quotes}full steam ahead{close_quotes}, originally conceived when commercial geothermal operation started in 1973. It is thus proper and timely to refer tomore » historical highlights and experiences in geothermal energy development for planning and implementation of the country`s geothermal energy program.« less
PET - radiopharmaceutical facilities at Washington University Medical School - an overview
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dence, C.S.; Welch, M.J.
1994-12-31
The PET program at Washington University has evolved over more than three decades of research and development in the use of positron-emitting isotopes in medicine and biology. In 1962 the installation of the first hospital cyclotron in the USA was accomplished. This first machine was an Allis Chalmers (AC) cyclotron and it was operated until July, 1990. Simultaneously with this cyclotron the authors also ran a Cyclotron Corporation (TCC) CS-15 cyclotron that was purchased in 1977. Both of these cyclotrons were maintained in-house and operated with a relatively small downtime (approximately 3.5%). After the dismantling of the AC machine inmore » 1990, a Japanese Steel Works 16/8 (JSW-16/8) cyclotron was installed in the vault. Whereas the AC cyclotron could only accelerate deuterons (6.2 MeV), the JSW - 16/8 machine can accelerate both protons and deuterons, so all of the radiopharmaceuticals can be produced on either of the two presently owned accelerators. At the end of May 1993, the medical school installed the first clinical Tandem Cascade Accelerator (TCA) a collaboration with Science Research Laboratories (SRL) of Somerville, MA. Preliminary target testing, design and development are presently under way. In 1973, the University installed the first operational PETT device in the country, and at present there is a large basic science and clinical research program involving more than a hundred staff in nuclear medicine, radiation sciences, neurology, neurosurgery, psychiatry, cardiology, pulmonary medicine, oncology, and surgery.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Del Bianco, M.; Wiehagen, J.
This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of buildingmore » air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.« less
Field Trial of an Aerosol-Based Enclosure Sealing Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrington, Curtis; Springer, David
2015-09-01
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology. However, this technology is capable of bringing the air leakage of a building that was built with standard construction techniques and HERS-verified sealing down to levels that would meet DOE Zero Energy Ready Homes program requirements. When a developer is striving to meet a tighter envelope leakage specification, this technology could greatly reduce the cost to achieve that goal by providing a simple and relatively low cost method for reducing the air leakage of a building envelope with little to no change in their common building practices.« less