Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... agreement (PLA), as they may decide appropriate, on large-scale construction projects, where the total cost... procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor organizations that... the use of a project labor agreement (PLA), as they may decide appropriate, on large-scale...
Project Management Life Cycle Models to Improve Management in High-rise Construction
NASA Astrophysics Data System (ADS)
Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana
2018-03-01
The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.
Xu, Jiuping; Feng, Cuiying
2014-01-01
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
Xu, Jiuping
2014-01-01
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-23
... a project labor agreement (PLA), as they may decide appropriate, on large-scale construction... efficiency in Federal procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor...
Effective Safety Management in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
Development of Capstone Project Attitude Scales
ERIC Educational Resources Information Center
Bringula, Rex P.
2015-01-01
This study attempted to develop valid and reliable Capstone Project Attitude Scales (CPAS). Among the scales reviewed, the Modified Fennema-Shermann Mathematics Attitude Scales was adapted in the construction of the CPAS. Usefulness, Confidence, and Gender View were the three subscales of the CPAS. Four hundred sixty-three students answered the…
Julee A Herdt; John Hunt; Kellen Schauermann
2016-01-01
This project demonstrates newly invented, biobased construction materials developed by applying lowcarbon, biomass waste sources through the Authorsâ engineered fiber processes and technology. If manufactured and applied large-scale the project inventions can divert large volumes of cellulose waste into high-performance, low embodied energy, environmental construction...
Code of Federal Regulations, 2010 CFR
2010-01-01
... developing by providing structure and stability to large-scale construction projects, thereby promoting the... procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing... construction projects receiving Federal financial assistance, would help to promote the economical, efficient...
Full-Scale Accelerated Testing of Multi-axial Geogrid Stabilized Flexible Pavements
2017-06-01
costs and reduced budgets, transportation officials are often tasked with applying innovative solutions to pavement design and construction projects... pavement designers . 1.2 Objective The objective of this effort was to construct and traffic full-scale flexible pavement sections to provide...Development Center (ERDC) constructed the full-scale test section as designed by Tensar under shelter in its Hangar 2 Pavement Test Facility. During
Sahin, Sükran; Kurum, Ekrem
2009-09-01
Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.
Ravikumar, Dwarakanath; Sinha, Parikhit
2017-10-01
With utility-scale photovoltaic (PV) projects increasingly developed in dry and dust-prone geographies with high solar insolation, there is a critical need to analyze the impacts of PV installations on the resulting particulate matter (PM) concentrations, which have environmental and health impacts. This study is the first to quantify the impact of a utility-scale PV plant on PM concentrations downwind of the project site. Background, construction, and post-construction PM 2.5 and PM 10 (PM with aerodynamic diameters <2.5 and <10 μm, respectively) concentration data were collected from four beta attenuation monitor (BAM) stations over 3 yr. Based on these data, the authors evaluate the hypothesis that PM emissions from land occupied by a utility-scale PV installation are reduced after project construction through a wind-shielding effect. The results show that the (1) confidence intervals of the mean PM concentrations during construction overlap with or are lower than background concentrations for three of the four BAM stations; and (2) post-construction PM 2.5 and PM 10 concentrations downwind of the PV installation are significantly lower than the background concentrations at three of the four BAM stations. At the fourth BAM station, downwind post-construction PM 2.5 and PM 10 concentrations increased marginally by 5.7% and 2.6% of the 24-hr ambient air quality standards defined by the U.S. Environmental Protection Agency, respectively, when compared with background concentrations, with the PM 2.5 increase being statistically insignificant. This increase may be due to vehicular emissions from an access road near the southwest corner of the site or a drainage berm near the south station. The findings demonstrate the overall environmental benefit of downwind PM emission abatement from a utility-scale PV installation in desert conditions due to wind shielding. With PM emission reductions observed within 10 months of completion of construction, post-construction monitoring of downwind PM levels may be reduced to a 1-yr period for other projects with similar soil and weather conditions. This study is the first to analyze impact of a utility photovoltaic (PV) project on downwind particulate matter (PM) concentration in desert conditions. The PM data were collected at four beta attenuation monitor stations over a 3-yr period. The post-construction PM concentrations are lower than background concentrations at three of four stations, therefore supporting the hypothesis of post-construction wind shielding from PV installations. With PM emission reductions observed within 10 months of completion of construction, postconstruction monitoring of downwind PM levels may be reduced to a 1-yr period for other PV projects with similar soil and weather conditions.
Construct and test scale model box culvert design project.
DOT National Transportation Integrated Search
2010-11-01
The research team at the University of New Mexicos (UNM) hydraulics lab designed, constructed, and : tested a 1:20 scale physical model of a proposed culvert in Jemez Springs, New Mexico. The culvert : design was developed by the New Mexico Depart...
Forensic Schedule Analysis of Construction Delay in Military Projects in the Middle East
This research performs forensic schedule analysis of delay factors that impacted recent large-scale military construction projects in the Middle East...The methodologies for analysis are adapted from the Professional Practice Guide to Forensic Schedule Analysis, particularly Method 3.7 Modeled
He, Guizhen; Zhang, Lei; Lu, Yonglong
2009-09-01
Large-scale public infrastructure projects have featured in China's modernization course since the early 1980s. During the early stages of China's rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai-Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway's construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.
Studies on combined model based on functional objectives of large scale complex engineering
NASA Astrophysics Data System (ADS)
Yuting, Wang; Jingchun, Feng; Jiabao, Sun
2018-03-01
As various functions were included in large scale complex engineering, and each function would be conducted with completion of one or more projects, combined projects affecting their functions should be located. Based on the types of project portfolio, the relationship of projects and their functional objectives were analyzed. On that premise, portfolio projects-technics based on their functional objectives were introduced, then we studied and raised the principles of portfolio projects-technics based on the functional objectives of projects. In addition, The processes of combined projects were also constructed. With the help of portfolio projects-technics based on the functional objectives of projects, our research findings laid a good foundation for management of large scale complex engineering portfolio management.
HSTDEK: Developing a methodology for construction of large-scale, multi-use knowledge bases
NASA Technical Reports Server (NTRS)
Freeman, Michael S.
1987-01-01
The primary research objectives of the Hubble Space Telescope Design/Engineering Knowledgebase (HSTDEK) are to develop a methodology for constructing and maintaining large scale knowledge bases which can be used to support multiple applications. To insure the validity of its results, this research is being persued in the context of a real world system, the Hubble Space Telescope. The HSTDEK objectives are described in detail. The history and motivation of the project are briefly described. The technical challenges faced by the project are outlined.
Building the Superconducting Super Collider, 1989-1993: The Problem of Project Management
NASA Astrophysics Data System (ADS)
Riordan, Michael
2011-04-01
In attempting to construct the Superconducting Super Collider, US particle physicists faced a challenge unprecedented in the history of science. The SSC was the biggest and costliest pure scientific project ever, comparable in overall scale to the Manhattan Project or the Panama Canal - an order of magnitude larger than any previous particle accelerator or collider project. Managing such an enormous endeavor involved coordinating conventional-construction, magnet-manufacturing, and detector-building efforts costing over a billion dollars apiece. Because project-management experience at this scale did not exist within the physics community, the Universities Research Association and the US Department of Energy turned to companies and individuals from the military-industrial complex, with mixed results. The absence of a strong, qualified individual to serve as Project Manager throughout the duration of the project was a major problem. I contend that these problems in its project management contributed importantly to the SSC's 1993 demise. Research supported by NSF Award No. 823296.
A Human Systems Integration Approach to Energy Efficiency in Ground Transportation
2015-12-01
Granite Construction Organizational Structure .........................................53 Figure 7. A Comparison of USMC Structure to Granite Construction...Caterpillar Corporation and the implementation and use of their telematics systems within a company called Granite Construction. Granite Construction...profit over 250 million dollars annually. In addition, similar to the USMC, Granite Construction handles both large and small scale projects in a
The modified polyconic projection for the IMW.
Snyder, J.P.
1982-01-01
The modified polyconic map projection designed by Lallemand and adopted for the International Map of the World between 1909 and 1962 has two meridians and two parallels which are true to scale. Constructed geometrically in the past, forward and inverse coordinate transformations may be calculated analytically in order to transfer data from existing quadrangles to other maps. The equations for these transformations are derived and used to calculate representative tables of coordinates and scale factors. Although the projection is neither equal-area nor conformal, scale does not vary more than 0.06% throughout the quadrangle.-Author
FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kenison, LaVesta; Flanigan, Thomas; Hagerty, Gregg
The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integratedmore » in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.« less
ERIC Educational Resources Information Center
Turns, Jennifer; Cuddihy, Elisabeth; Guan, Zhiwei
2010-01-01
In this work, we sought to understand ways that students experienced a small-scale portfolio assignment provided to them as an opportunity reflect on their experiences in a project-based class. This work was motivated by research in various instructional contexts showing that portfolio construction results in important learning outcomes. We wanted…
World Bank oil-pipeline project designed to prevent HIV transmission.
Kigotho, A W
1997-11-29
A World Bank-funded oil pipeline project, in Chad and Cameroon, is the first large-scale construction project in sub-Saharan Africa to incorporate an HIV/AIDS prevention component. The project entails the development of oil fields in southern Chad and construction of 1100 km of pipeline to port facilities on Cameroon's Atlantic coast. 3000 construction workers from the two countries will be employed between 1998 and 2001, including about 600 truck drivers. In some areas along the pipeline route, 50% of the prostitutes (who are frequented by truck drivers) are HIV-infected. The HIV/AIDS intervention aims to prevent HIV and sexually transmitted diseases (STDs) among project workers through social marketing of condoms, treatment of STDs in prostitutes along the route, and health education to modify high-risk behaviors. The program is considered a test case for African governments and donors interested in whether the integration of a health component in major construction projects can avoid AIDS epidemics in affected countries.
NASA Astrophysics Data System (ADS)
Sharf, I. V.; Chukhareva, N. V.; Kuznetsova, L. P.
2014-08-01
High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of "Sila Sibiri", the "Chayanda-Lensk" section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks.
NASA Astrophysics Data System (ADS)
Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.
2018-02-01
Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.
REAL TIME CONTROL OF SEWERS: US EPA MANUAL
The problem of sewage spills and local flooding has traditionally been addressed by large scale capital improvement programs that focus on construction alternatives such as sewer separation or construction of storage facilities. The cost of such projects is often high, especiall...
Optical mapping and its potential for large-scale sequencing projects.
Aston, C; Mishra, B; Schwartz, D C
1999-07-01
Physical mapping has been rediscovered as an important component of large-scale sequencing projects. Restriction maps provide landmark sequences at defined intervals, and high-resolution restriction maps can be assembled from ensembles of single molecules by optical means. Such optical maps can be constructed from both large-insert clones and genomic DNA, and are used as a scaffold for accurately aligning sequence contigs generated by shotgun sequencing.
Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2013-03-01
To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less
Evaluation of rutting distresses on I-20 near Mound to Delta Scales.
DOT National Transportation Integrated Search
2014-01-01
Within six months of construction, areas with excessive premature rutting were noticed on a 4.95 mile long asphaltic concrete overlay : project on the I-20 corridor in Madison Parish, Louisiana. The scope of the project included full depth patching o...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehrez, Loujaine; Ghanem, Roger; McAuliffe, Colin
multiscale framework to construct stochastic macroscopic constitutive material models is proposed. A spectral projection approach, specifically polynomial chaos expansion, has been used to construct explicit functional relationships between the homogenized properties and input parameters from finer scales. A homogenization engine embedded in Multiscale Designer, software for composite materials, has been used for the upscaling process. The framework is demonstrated using non-crimp fabric composite materials by constructing probabilistic models of the homogenized properties of a non-crimp fabric laminate in terms of the input parameters together with the homogenized properties from finer scales.
NASA Astrophysics Data System (ADS)
Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Chen, Y.; Cutler, R.; Fox, W.; Hoffmann, F.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.; Bale, S. D.; Carter, T.; Dorfman, S.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.
2016-10-01
The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton for the studies of magnetic reconnection in the multiple X-line regimes directly relevant to space, solar, astrophysical, and fusion plasmas, as guided by a reconnection phase diagram [Ji & Daughton, (2011)]. Most of major components either have been already fabricated or are near their completion, including the two most crucial magnets called flux cores. The hardware assembly and installation begin in this summer, followed by commissioning in 2017. Initial comprehensive set of research diagnostics will be constructed and installed also in 2017. The main diagnostics is an extensive set of magnetic probe arrays, covering multiple scales from local electron scales, to intermediate ion scales, and global MHD scales. The planned procedures and example topics as a user facility will be discussed.
Insurance of risks as the instrument of protection of investments into high-rise construction
NASA Astrophysics Data System (ADS)
Vasilyeva, Elena; Okrepilov, Vladimir
2018-03-01
Insurance now is one of the important sectors for both world, and national financial systems. The mechanism of insurance of risks plays an essential role in the process of construction of high-rise buildings and as well as other unique objects. The author argues that insurance is categorically necessary because of the following reasons: huge scale and complexity of high-rise projects and great expenses, the use of unsafe sites for construction, great possible losses in case of the project, important role for the city infrastructure, numerous organizations, involved into the process of construction and maintenance, multypurpose use of the building. The features of insurance in the field of high-rise construction is also considered in the article. The prerequisites, confirming the loss occurrence are named.
Establishing the validity and reliability of the Project Talent Personality Inventory
Pozzebon, Julie; Damian, Rodica I.; Hill, Patrick L.; Lin, Yuchen; Lapham, Susan; Roberts, Brent W.
2013-01-01
Project Talent is a national longitudinal study that started in 1960. The original sample included over 440,000 students, which amounted to a 5% representative sample of high school students across the United States. Previous research has not yet established the validity and reliability of the personality measure used in this study, that is, the Project Talent Personality Inventory (PTPI). Given the potential interest and use of the PTPI in forthcoming research, the goals of the present paper were to establish (a) the construct and predictive validity and (b) the internal consistency and test-retest reliability of the PTPI. This information will be valuable to researchers who might be interested in using the PTPI to predict life course outcomes, such as mortality, occupational success, relationship success, and health. Study 1 found that the 10 sub-scales of the PTPI showed good internal consistency reliability, as well as good construct and predictive validity. With the use of several modern personality measures, we showed how the 10 PTPI scales can be mapped onto the Big Five personality traits, and we examined their relations with health, well-being, and life satisfaction outcomes. Study 2 found that the 10 PTPI scales showed good test-retest reliability. Together, these findings allow researchers to better understand and use the PTPI scales, as they are available in Project Talent. PMID:24399984
Workforce Development Analysis | Energy Analysis | NREL
with customer service, construction, and electrical projects One-half of surveyed firms reported , training, and experience that will enable continued large-scale deployment of wind and solar technologies engineers; and project managers. Standardized education and training at all levels-primary school through
Weather Augmented Risk Determination (WARD) System
NASA Astrophysics Data System (ADS)
Niknejad, M.; Mazdiyasni, O.; Momtaz, F.; AghaKouchak, A.
2017-12-01
Extreme climatic events have direct and indirect impacts on society, economy and the environment. Based on the United States Bureau of Economic Analysis (BEA) data, over one third of the U.S. GDP can be considered as weather-sensitive involving some degree of weather risk. This expands from a local scale concrete foundation construction to large scale transportation systems. Extreme and unexpected weather conditions have always been considered as one of the probable risks to human health, productivity and activities. The construction industry is a large sector of the economy, and is also greatly influenced by weather-related risks including work stoppage and low labor productivity. Identification and quantification of these risks, and providing mitigation of their effects are always the concerns of construction project managers. In addition to severe weather conditions' destructive effects, seasonal changes in weather conditions can also have negative impacts on human health. Work stoppage and reduced labor productivity can be caused by precipitation, wind, temperature, relative humidity and other weather conditions. Historical and project-specific weather information can improve better project management and mitigation planning, and ultimately reduce the risk of weather-related conditions. This paper proposes new software for project-specific user-defined data analysis that offers (a) probability of work stoppage and the estimated project length considering weather conditions; (b) information on reduced labor productivity and its impacts on project duration; and (c) probabilistic information on the project timeline based on both weather-related work stoppage and labor productivity. The software (WARD System) is designed such that it can be integrated into the already available project management tools. While the system and presented application focuses on the construction industry, the developed software is general and can be used for any application that involves labor productivity (e.g., farming) and work stoppage due to weather conditions (e.g., transportation, agriculture industry).
NASA Astrophysics Data System (ADS)
Lipsky, A.
2016-12-01
In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.
NASA Astrophysics Data System (ADS)
Lipsky, A.
2016-02-01
In August 2015 construction commenced on the Block Island Wind Farm, the first offshore wind energy project in the U.S. This pilot-scale offshore energy project, located 18 miles offshore of the Rhode Island mainland, was sited through a comprehensive ocean planning process. As the project progressed into design and construction, our team utilized potent ecosystem based management approaches to great advantage to address the human and resource interactions that existed in the project area. These practices have included designing and executing collaborative long-term monitoring ventures to fill key science gaps and reconcile fisheries concerns, establishing effective industry to industry engagement, and developing durable multi-sector agreements. This presentation will describe the specific EBM approaches used after the planning process was completed to bring the project to construction; highlighting where key aspects of the National Ocean Policy goals and principles have been successfully applied.
Boat Building Design and Construction Techniques in the Architectural Design Studio.
ERIC Educational Resources Information Center
Smith, Richard A.
1982-01-01
Describes a model boat building project for architectural design studios. Working from traditional sailboat designs, students study the "lines" drawings of boats, make full-size drawings from scale drawings, and then construct model wooden boats. Available from Carfax Publishing Company, P.O. Box 25, Abindgon, Oxfordshire OX14 1RW…
Multidimensional Scaling in the Poincare Disk
2011-05-01
REPORT Multidimensional Scaling in the Poincare Dis 14. ABSTRACT 16. SECURITY CLASSIFICATION OF: Multidimensional scaling (MDS) is a class of projective...DATES COVERED (From - To) Standard Form 298 (Rev 8/98) Prescribed by ANSI Std. Z39.18 - Multidimensional Scaling in the Poincare Dis Report Title... plane . Our construction is based on an approximate hyperbolic line search and exempli?es some of the particulars that need to be addressed when
A numerical projection technique for large-scale eigenvalue problems
NASA Astrophysics Data System (ADS)
Gamillscheg, Ralf; Haase, Gundolf; von der Linden, Wolfgang
2011-10-01
We present a new numerical technique to solve large-scale eigenvalue problems. It is based on the projection technique, used in strongly correlated quantum many-body systems, where first an effective approximate model of smaller complexity is constructed by projecting out high energy degrees of freedom and in turn solving the resulting model by some standard eigenvalue solver. Here we introduce a generalization of this idea, where both steps are performed numerically and which in contrast to the standard projection technique converges in principle to the exact eigenvalues. This approach is not just applicable to eigenvalue problems encountered in many-body systems but also in other areas of research that result in large-scale eigenvalue problems for matrices which have, roughly speaking, mostly a pronounced dominant diagonal part. We will present detailed studies of the approach guided by two many-body models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wissemann, Chris; White, Stanley M
The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical programmore » to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fitzpatrick, Stephen W.
This project involved a three-year program managed by BioMetics, Inc. (Waltham, MA) to demonstrate the commercial feasibility of Biofine thermochemical process technology for conversion of cellulose-containing wastes or renewable materials into levulinic acid, a versatile platform chemical. The program, commencing in October 1995, involved the design, procurement, construction and operation of a plant utilizing the Biofine process to convert 1 dry ton per day of paper sludge waste. The plant was successfully designed, constructed, and commissioned in 1997. It was operated for a period of one year on paper sludge from a variety of source paper mills to collect datamore » to verify the design for a commercial scale plant. Operational results were obtained for four different feedstock varieties. Stable, continuous operation was achieved for two of the feedstocks. Continuous operation of the plant at demonstration scale provided the opportunity for process optimization, development of operational protocols, operator training and identification of suitable materials of construction for scale up to commercial operation . Separated fiber from municipal waster was also successfully processed. The project team consisted of BioMetics Inc., Great Lakes Chemical Corporation (West Lafayette, IN), and New York State Energy Research and Development Authority (Albany, NY).« less
DOT National Transportation Integrated Search
2009-01-01
As part of the Innovative Bridge Research and Construction Program (IBRCP), this study was conducted to use the full-scale construction project of the Route 123 Bridge over the Occoquan River in Northern Virginia to identify and compare any differenc...
Rivard, C J; Duff, B W; Dickow, J H; Wiles, C C; Nagle, N J; Gaddy, J L; Clausen, E C
1998-01-01
Early evaluations of the bioconversion potential for combined wastes such as tuna sludge and sorted municipal solid waste (MSW) were conducted at laboratory scale and compared conventional low-solids, stirred-tank anaerobic systems with the novel, high-solids anaerobic digester (HSAD) design. Enhanced feedstock conversion rates and yields were determined for the HSAD system. In addition, the HSAD system demonstrated superior resiliency to process failure. Utilizing relatively dry feedstocks, the HSAD system is approximately one-tenth the size of conventional low-solids systems. In addition, the HSAD system is capable of organic loading rates (OLRs) on the order of 20-25 g volatile solids per liter digester volume per d (gVS/L/d), roughly 4-5 times those of conventional systems. Current efforts involve developing a demonstration-scale (pilot-scale) HSAD system. A two-ton/d plant has been constructed in Stanton, CA and is currently in the commissioning/startup phase. The purposes of the project are to verify laboratory- and intermediate-scale process performance; test the performance of large-scale prototype mechanical systems; demonstrate the long-term reliability of the process; and generate the process and economic data required for the design, financing, and construction of full-scale commercial systems. This study presents conformational fermentation data obtained at intermediate-scale and a snapshot of the pilot-scale project.
Project M: Scale Model of Lunar Landing Site of Apollo 17
NASA Technical Reports Server (NTRS)
O'Brien, Hollie; Crain, Timothy P.
2010-01-01
The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize approach phase, terminal descent phase, and surface phase operations on the physical model. The project had an additional requirement that was also satisfied: the granite table the model was placed on must be returnable to its original condition if needed in the future.
Multi-sensor image registration based on algebraic projective invariants.
Li, Bin; Wang, Wei; Ye, Hao
2013-04-22
A new automatic feature-based registration algorithm is presented for multi-sensor images with projective deformation. Contours are firstly extracted from both reference and sensed images as basic features in the proposed method. Since it is difficult to design a projective-invariant descriptor from the contour information directly, a new feature named Five Sequential Corners (FSC) is constructed based on the corners detected from the extracted contours. By introducing algebraic projective invariants, we design a descriptor for each FSC that is ensured to be robust against projective deformation. Further, no gray scale related information is required in calculating the descriptor, thus it is also robust against the gray scale discrepancy between the multi-sensor image pairs. Experimental results utilizing real image pairs are presented to show the merits of the proposed registration method.
Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2013-03-01
To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less
A. Weiskittel; D. Maguire; R. Monserud
2007-01-01
Hybrid models offer the opportunity to improve future growth projections by combining advantages of both empirical and process-based modeling approaches. Hybrid models have been constructed in several regions and their performance relative to a purely empirical approach has varied. A hybrid model was constructed for intensively managed Douglas-fir plantations in the...
Brief Self-Report Scales Assessing Life History Dimensions of Mating and Parenting Effort.
Kruger, Daniel J
2017-01-01
Life history theory (LHT) is a powerful evolutionary framework for understanding physiological, psychological, and behavioral variation both between and within species. Researchers and theorists are increasingly integrating LHT into evolutionary psychology, as it provides a strong foundation for research across many topical areas. Human life history variation has been represented in psychological and behavioral research in several ways, including indicators of conditions in the developmental environment, indicators of conditions in the current environment, and indicators of maturation and life milestones (e.g., menarche, initial sexual activity, first pregnancy), and in self-report survey scale measures. Survey scale measures have included constructs such as time perspective and future discounting, although the most widely used index is a constellation of indicators assessing the K-factor, thought to index general life history speed (from fast to slow). The current project examined the utility of two brief self-report survey measures assessing the life history dimensions of mating effort and parenting effort with a large undergraduate sample in the United States. Consistent with the theory, items reflected two inversely related dimensions. In regressions including the K-factor, the Mating Effort Scale proved to be a powerful predictor of other constructs and indicators related to life history variation. The Parenting Effort Scale had less predictive power overall, although it explained unique variance across several constructs and was the only unique predictor of the number of long-term (serious and committed) relationships. These scales may be valuable additions to self-report survey research projects examining life history variation.
NASA Astrophysics Data System (ADS)
Klise, G. T.; Tidwell, V. C.; Macknick, J.; Reno, M. D.; Moreland, B. D.; Zemlick, K. M.
2013-12-01
In the Southwestern United States, there are many large utility-scale solar photovoltaic (PV) and concentrating solar power (CSP) facilities currently in operation, with even more under construction and planned for future development. These are locations with high solar insolation and access to large metropolitan areas and existing grid infrastructure. The Bureau of Land Management, under a reasonably foreseeable development scenario, projects a total of almost 32 GW of installed utility-scale solar project capacity in the Southwest by 2030. To determine the potential impacts to water resources and the potential limitations water resources may have on development, we utilized methods outlined by the Bureau of Land Management (BLM) to determine potential water use in designated solar energy zones (SEZs) for construction and operations & maintenance (O&M), which is then evaluated according to water availability in six Southwestern states. Our results indicate that PV facilities overall use less water, however water for construction is high compared to lifetime operational water needs. There is a transition underway from wet cooled to dry cooled CSP facilities and larger PV facilities due to water use concerns, though some water is still necessary for construction, operations, and maintenance. Overall, ten watersheds, 9 in California, and one in New Mexico were identified as being of particular concern because of limited water availability. Understanding the location of potentially available water sources can help the solar industry determine locations that minimize impacts to existing water resources, and help understand potential costs when utilizing non-potable water sources or purchasing existing appropriated water. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-08-01
In this pilot project, the Building America Partnership for Improved Residential Construction and Florida Power and Light are collaborating to retrofit a large number of homes using a phased approach to both simple and deep retrofits. This project will provide the information necessary to significantly reduce energy use through larger community-scale projects in collaboration with utilities, program administrators and other market leader stakeholders.
Desalination: Status and Federal Issues
2009-12-30
on one side and lets purified water through. Reverse osmosis plants have fewer problems with corrosion and usually have lower energy requirements...Texas) and cities are actively researching and investigating the feasibility of large-scale desalination plants for municipal water supplies...desalination research and development, and in construction and operational costs of desalination demonstration projects and full-scale plants
FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramin Yazdani; Jeff Kieffer; Heather Akau
2003-08-01
The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes ofmore » air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell is nearly complete with only the biofilter remaining and is scheduled to be complete by the end of August 2003. The current project status and preliminary monitoring results are summarized in this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim
2013-07-01
The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less
NASA Astrophysics Data System (ADS)
Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.
2009-05-01
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.
Thorne, James H; Girvetz, Evan H; McCoy, Michael C
2009-05-01
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.
Construction of shipping channels in the Detroit River—History and environmental consequences
Bennion, David H.; Manny, Bruce A.
2011-01-01
The Detroit River is one of the most biologically diverse areas in the Great Lakes basin. It has been an important international shipping route since the 1820s and is one of the busiest navigation centers in the United States. Historically, it supported one of the most profitable Lake Whitefish (Coregonus clupeaformis) commercial fisheries in the Great Lakes. Since 1874, the lower Detroit River has been systematically and extensively modified, by construction of deepwater channels, to facilitate commercial shipping. Large-scale dredging, disposal of dredge spoils, and construction of water-level compensating works has greatly altered channel morphology and flow dynamics of the river, disrupting ecological function and fishery productivity of the river and influencing Great Lakes water levels. From 1874 to 1968, major construction projects created 96.5 kilometers (60 miles) of shipping channels, removed over 46,200,000 m3 of material, covered 4,050 hectares (40.5 square kilometers) of river bottom with dredge spoils, and built 85 hectares of above-waterline compensating works at a total cost of US$283 million. Interest by industries and government agencies to develop the river further for shipping is high and increasing. Historically, as environmental protection agencies were created, construction impacts on natural resources were increasingly addressed during the planning process and, in some cases, assessments of these impacts greatly altered or halted proposed construction projects. Careful planning of future shipping-channel construction and maintenance projects, including a thorough analysis of the expected environmental impacts, could greatly reduce financial costs and ecological damages as compared to past shipping-channel construction projects.
McDonald, Richard R.; Nelson, Jonathan M.; Fosness, Ryan L.; Nelson, Peter O.; Constantinescu, George; Garcia, Marcelo H.; Hanes, Dan
2016-01-01
Two- and three-dimensional morphodynamic simulations are becoming common in studies of channel form and process. The performance of these simulations are often validated against measurements from laboratory studies. Collecting channel change information in natural settings for model validation is difficult because it can be expensive and under most channel forming flows the resulting channel change is generally small. Several channel restoration projects designed in part to armor large meanders with several large spurs constructed of wooden piles on the Kootenai River, ID, have resulted in rapid bed elevation change following construction. Monitoring of these restoration projects includes post- restoration (as-built) Digital Elevation Models (DEMs) as well as additional channel surveys following high channel forming flows post-construction. The resulting sequence of measured bathymetry provides excellent validation data for morphodynamic simulations at the reach scale of a real river. In this paper we test the performance a quasi-three-dimensional morphodynamic simulation against the measured elevation change. The resulting simulations predict the pattern of channel change reasonably well but many of the details such as the maximum scour are under predicted.
DOE Office of Scientific and Technical Information (OSTI.GOV)
HERTING DL
2008-09-16
The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Marvin; Bose, James; Beier, Richard
2004-12-01
The assets that Citizen Potawatomi Nation holds were evaluated to help define the strengths and weaknesses to be used in pursuing economic prosperity. With this baseline assessment, a Planning Team will create a vision for the tribe to integrate into long-term energy and business strategies. Identification of energy efficiency devices, systems and technologies was made, and an estimation of cost benefits of the more promising ideas is submitted for possible inclusion into the final energy plan. Multiple energy resources and sources were identified and their attributes were assessed to determine the appropriateness of each. Methods of saving energy were evaluatedmore » and reported on and potential revenue-generating sources that specifically fit the tribe were identified and reported. A primary goal is to create long-term energy strategies to explore development of tribal utility options and analyze renewable energy and energy efficiency options. Associated goals are to consider exploring energy efficiency and renewable economic development projects involving the following topics: (1) Home-scale projects may include construction of a home with energy efficiency or renewable energy features and retrofitting an existing home to add energy efficiency or renewable energy features. (2) Community-scale projects may include medium to large scale energy efficiency building construction, retrofit project, or installation of community renewable energy systems. (3) Small business development may include the creation of a tribal enterprise that would manufacture and distribute solar and wind powered equipment for ranches and farms or create a contracting business to include energy efficiency and renewable retrofits such as geothermal heat pumps. (4) Commercial-scale energy projects may include at a larger scale, the formation of a tribal utility formed to sell power to the commercial grid, or to transmit and distribute power throughout the tribal community, or hydrogen production, and propane and natural-gas distribution systems.« less
NASA's Hypersonic Research Engine Project: A review
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1994-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
Deployment of Wind Turbines in the Built Environment: Risks, Lessons, and Recommended Practices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baring-Gould, Ian; Fields, Jason; Oteri, Frank
Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings, as shown below. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. This poster investigates the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology.
Contruction worker profile. community report--Center, North Dakota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chalmers, J.A.; Glazner, J.
Center, North Dakota is one of the currently affected communities included in the study to help us learn something of the effects which large-scale construction projects have on small communities. The findings of the Project Survey, which was conducted at the Milton R. Young and Leland Olds Power plants, along with the findings of the Household Survey and the Community Survey, are presented.
Sewage sludge pasteurization by gamma radiation: A Canadian demonstration project — 1988-91
NASA Astrophysics Data System (ADS)
Swinwood, Jean F.; Wilson, Bruce K.
Nordion International Inc. and a Canadian city, in cooperation with the Federal & Provincial Ministries of the Environment, began a project in 1988 to construct and operate a commercial-scale sewage sludge pasteurization facility using gamma radiation technology. The facility is scheduled to begin operations in 1991. This paper discusses the objectives and scope of the project, the design of the irradiation system, and the plans to market the pasteurized sludge as a high-value, organic soil conditioner and fertilizer.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aptekar, Alexander
The final report on New York City College of Technology (City Tech) DURA (Diverse | Urban | Resilient | Adaptable) home project. City Tech has participated in the Solar Decathlon 2015 project as DURA. The DURA team consists of students, faculty, volunteers, Service Corps participants, Industry advisers, recent graduates and others. The DURA team researched, designed, and constructed a zero energy prototype house. This process was a valuable opportunity for City Tech as a project of such scale has not been completed before with the integration of so many departments and their students.
Critical management practices influencing on-site waste minimization in construction projects.
Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A
2017-01-01
As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Riggins, R. E. (Principal Investigator); Anderson, J. R.
1977-01-01
The author has identified the following significant results: (1) LANDSAT imagery can be used effectively as a baseline for detection of environmental change, resulting from construction of a major inland reservoir. (2) Forest cover can be observed adequately on two-band composite enlargements at a scale of 1:130,000. (3) Forest cover delineated on LANDSAT enlargements compares accurately with ground truth at a scale of 1:250,000. (4) A dual image mapping technique superimposing winter, summer, and spring scenes using the zoom transfer scope facilitates the determination. (5) The same technique can be used to detect changes in the project area, resulting from construction activities. (6) High altitude aircraft imagery can also be used to interpret changes in land use and forest type. (7) Construction operations can be more clearly detailed on the air photos than on LANDSAT imagery.
Design and construction of a remote piloted flying wing. B.S. Thesis
NASA Technical Reports Server (NTRS)
Costa, Alfred J.; Koopman, Fritz; Soboleski, Craig; Trieu, Thai-Ba; Duquette, Jaime; Krause, Scott; Susko, David; Trieu, Thuyba
1994-01-01
Currently, there is a need for a high-speed, high-lift civilian transport. Although unconventional, a flying wing could fly at speeds in excess of Mach 2 and still retain the capacity of a 747. The design of the flying wing is inherently unstable since it lacks a fuselage and a horizontal tail. The project goal was to design, construct, fly, and test a remote-piloted scale model flying wing. The project was completed as part of the NASA/USRA Advanced Aeronautics Design Program. These unique restrictions required us to implement several fundamental design changes from last year's Elang configuration including wing sweepback and wingtip endplates. Unique features such as a single ducted fan engine, composite structural materials, and an electrostatic stability system were incorporated. The result is the Banshee '94. Our efforts will aid future projects in design and construction techniques so that a viable flying wing can become an integral part of the aviation industry.
The marked tree site : evaluation of basal reinforcement of flexible pavements with geosynthetics.
DOT National Transportation Integrated Search
2011-12-01
This document presents findings from a three-year, full-scale, field research project : aimed at determining the benefits of using geosynthetic reinforcements to improve the : performance of flexible pavements constructed over poor subgrade soils. Th...
ERIC Educational Resources Information Center
Williams, Jessica H.; Green, Melanie C.; Kohler, Connie; Allison, Jeroan J.; Houston, Thomas K.
2011-01-01
Objective: To evaluate the construct and criterion validity of the Video Transportation Scale (VTS). Setting: Inpatient service of a safety net hospital in Birmingham, Alabama, USA. Method: We administered the VTS in the context of a randomized controlled trial of a DVD-delivered narrative-based intervention (stories) designed to encourage smoking…
FULL SCALE BIOREACTOR LANDFILL FOR CARBON SEQUESTRATION AND GREENHOUSE EMISSION CONTROL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramin Yazdani; Jeff Kieffer; Heather Akau
2003-12-01
The Yolo County Department of Planning and Public Works is constructing a full-scale bioreactor landfill as a part of the Environmental Protection Agency's (EPA) Project XL program to develop innovative approaches for carbon sequestration and greenhouse emission control. The overall objective is to manage landfill solid waste for rapid waste decomposition and maximum landfill gas generation and capture for carbon sequestration and greenhouse emission control. Waste decomposition is accelerated by improving conditions for either the aerobic or anaerobic biological processes and involves circulating controlled quantities of liquid (leachate, groundwater, gray water, etc.), and, in the aerobic process, large volumes ofmore » air. The first phase of the project entails the construction of a 12-acre module that contains a 6-acre anaerobic cell, a 3.5-acre anaerobic cell, and a 2.5-acre aerobic cell at the Yolo County Central Landfill near Davis, California. The cells are highly instrumented to monitor bioreactor performance. Liquid addition has commenced in the 3.5-acre anaerobic cell and the 6-acre anaerobic cell. Construction of the 2.5-acre aerobic cell and biofilter has been completed. The remaining task to be completed is to test the biofilter prior to operation, which is currently anticipated to begin in January 2004. The current project status and preliminary monitoring results are summarized in this report.« less
Gittleman, Janie L; Gardner, Paige C; Haile, Elizabeth; Sampson, Julie M; Cigularov, Konstantin P; Ermann, Erica D; Stafford, Pete; Chen, Peter Y
2010-06-01
The present study describes a response to eight tragic deaths over an eighteen month times span on a fast track construction project on the largest commercial development project in U.S. history. Four versions of a survey were distributed to workers, foremen, superintendents, and senior management. In addition to standard Likert-scale safety climate scale items, an open-ended item was included at the end of the survey. Safety climate perceptions differed by job level. Specifically, management perceived a more positive safety climate as compared to workers. Content analysis of the open-ended item was used to identify important safety and health concerns which might have been overlooked with the qualitative portion of the survey. The surveys were conducted to understand workforce issues of concern with the aim of improving site safety conditions. Such efforts can require minimal investment of resources and time and result in critical feedback for developing interventions affecting organizational structure, management processes, and communication. The most important lesson learned was that gauging differences in perception about site safety can provide critical feedback at all levels of a construction organization. Implementation of multi-level organizational perception surveys can identify major safety issues of concern. Feedback, if acted upon, can potentially result in fewer injuries and fatal events. (c) 2010 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doug Cathro
The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas andmore » Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.« less
Anderson, Elizabeth P.; Pringle, Catherine M.; Freeman, Mary C.
2008-01-01
Costa Rica has recently experienced a rapid proliferation of dams for hydropower on rivers draining its northern Caribbean slope. In the Sarapiquí River Basin, eight hydropower plants were built between 1990 and 1999 and more projects are either under construction or proposed. The majority of these dams are small (<15 m tall) and operate as water diversion projects.While the potential environmental effects of individual projects are evaluated prior to dam construction, there is a need for consideration of the basin-scale ecological consequences of hydropower development. This study was a first attempt to quantify the extent of river fragmentation by dams in the Sarapiquí River Basin.Using simple spatial analyses, the length of river upstream from dams and the length of de-watered reaches downstream from dams was measured. Results indicated that there are currently 306.8 km of river (9.4% of the network) upstream from eight existing dams in the Sarapiquí River Basin and 30.6 km of rivers (0.9% of the network) with significantly reduced flow downstream from dams. Rivers upstream from dams primarily drain two life zones: Premontane Rain Forest (107.9 km) and Lower Montane Rain Forest (168.2 km).Simple spatial analyses can be used as a predictive or planning tool for considering the effects of future dams in a basin-scale context. In the Sarapiquí River Basin, we recommend that future dam projects be constructed on already dammed rivers to minimize additional river fragmentation and to protect remaining riverine connectivity.
NASA Technical Reports Server (NTRS)
1977-01-01
Power levels up to 100 kWe average were baselined for the electrical power system of the space construction base, a long-duration manned facility capable of supporting manufacturing and large scale construction projects in space. Alternatives to the solar array battery systems discussed include: (1) solar concentrator/brayton; (2) solar concentrator/thermionic; (3) isotope/brayton; (4) nuclear/brayton; (5) nuclear thermoelectric; and (6) nuclear thermionic.
De-mystifying earned value management for ground based astronomy projects, large and small
NASA Astrophysics Data System (ADS)
Norton, Timothy; Brennan, Patricia; Mueller, Mark
2014-08-01
The scale and complexity of today's ground based astronomy projects have justifiably required Principal Investigator's and their project teams to adopt more disciplined management processes and tools in order to achieve timely and accurate quantification of the progress and relative health of their projects. Earned Value Management (EVM) is one such tool. Developed decades ago and used extensively in the defense and construction industries, and now a requirement of NASA projects greater than $20M; EVM has gained a foothold in ground-based astronomy projects. The intent of this paper is to de-mystify EVM by discussing the fundamentals of project management, explaining how EVM fits with existing principles, and describing key concepts every project can use to implement their own EVM system. This paper also discusses pitfalls to avoid during implementation and obstacles to its success. The authors report on their organization's most recent experience implementing EVM for the GMT-Consortium Large Earth Finder (G-CLEF) project. G-CLEF is a fiber-fed, optical echelle spectrograph that has been selected as a first light instrument for the Giant Magellan Telescope (GMT), planned for construction at the Las Campanas Observatory in Chile's Atacama Desert region.
Methane digester for wastewater grown aquatic plants. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1976-01-01
The purpose of this project was to build and test a small-scale, prototype anaerobic digester using wastewater grown aquatic plants as feed stock. Two 150 gal. digesters of the horizontal ''bag'' shape were constructed and fed with water hyacinths and duckweed plants grown on wastewater. Bio-films were added to increase methane bacteria surface attachment area, and solar heating was used to increase operating temperatures. Repeated difficulties were encountered with the low cost materials and construction techniques used, causing leaks of liquids and methane gas, and in the solar heat exchanger. As a consequence, no reliable data were obtained on performance.more » Due to an inadequate budget, the project was terminated without making construction changes needed to properly operate the system for a long period of time. 15 refs., 7 figs.« less
TAC Proton Accelerator Facility: The Status and Road Map
DOE Office of Scientific and Technical Information (OSTI.GOV)
Algin, E.; Akkus, B.; Caliskan, A.
2011-06-28
Proton Accelerator (PA) Project is at a stage of development, working towards a Technical Design Report under the roof of a larger-scale Turkish Accelerator Center (TAC) Project. The project is supported by the Turkish State Planning Organization. The PA facility will be constructed in a series of stages including a 3 MeV test stand, a 55 MeV linac which can be extended to 100+ MeV, and then a full 1-3 GeV proton synchrotron or superconducting linac. In this article, science applications, overview, and current status of the PA Project will be given.
National Ignition Facility Project: An Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, W J; Moses, E; Warner, B
2000-12-07
The National Ignition Facility (NIF) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beampath infrastructure has been reconsidered and a new approach has been developed. This papermore » will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less
The National Ignition Facility Project: An Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, W.J.; Moses, E.; Warner, B.
2000-12-07
The National Ignition Facility (NIT) consists of 192 forty-centimeter-square laser beams and a 10-m-diameter target chamber. Physical construction began in 1997. The Laser and Target Area Building and the Optics Assembly Building were the first major construction activities, and despite several unforeseen obstacles, the buildings are now 92% complete and have been done on time and within cost. Prototype component development and testing has proceeded in parallel. Optics vendors have installed full-scale production lines and have done prototype production runs. The assembly and integration of the beam path infrastructure has been reconsidered and a new approach has been developed. Thismore » paper will discuss the status of the NIF project and the plans for completion. It will also include summary information on Laser MegaJoule (LMJ) provided by M. Andre, LMJ Project Director.« less
Evaluation of Supply Chain Management Systems Used in Civil Engineering
NASA Astrophysics Data System (ADS)
Tomczak, Michał; Rzepecki, Łukasz
2017-10-01
One of the most important factors which have an effect on the cost and time of the building process is the organization of physical resources and the information flow structure. Depending on how effective this system is, a building project may end with a success or a failure. Because of many conditions of the construction executing and different needs of the contractors, there are different Supply Chain Management (SCM) systems connected with supplying construction projects: single-stage, multi-stage or combined. The article presents a comparative analysis of construction SCM systems based on a modified fuzzy AHP. The modification of this method is based on the use of interval type-2 fuzzy sets to aggregate evaluation according to the idea proposed by Mikhailov. The use of such a model of group preferences of decision-makers, makes it possible to take into consideration both the linguistic imprecision of an evaluation and the small number of experts. The weight values of specific criteria and the final scale vector of considered variants are obtained during the analysis. This may give a recommendation to general contractors in construction projects about which evaluation criteria and supply systems are preferred.
DOT National Transportation Integrated Search
2012-05-01
A total of 486 transportation employees employed by a major railroad completed a series of : tests constructed for this project. These tests or instruments included the Denver Lifestyle : Questionnaire, a performance rating scale called the Employees...
NASA Astrophysics Data System (ADS)
Bundschuh, V.; Grueter, J. W.; Kleemann, M.; Melis, M.; Stein, H. J.; Wagner, H. J.; Dittrich, A.; Pohlmann, D.
1982-08-01
A preliminary study was undertaken before a large scale project for construction and survey of about a hundred solar houses was launched. The notion of solar house was defined and the use of solar energy (hot water preparation, heating of rooms, heating of swimming pool, or a combination of these possibilities) were examined. A coherent measuring program was set up. Advantages and inconveniences of the large scale project were reviewed. Production of hot water, evaluation of different concepts and different fabrications of solar systems, coverage of the different systems, conservation of energy, failure frequency and failures statistics, durability of the installation, investment maintenance and energy costs were retained as study parameters. Different solar hot water production systems and the heat counter used for measurements are described.
Se substitution and micro-nano-scale porosity enhancing thermoelectric Cu2Te
NASA Astrophysics Data System (ADS)
Shi, Xiaoman; Wang, Guoyu; Wang, Ruifeng; Zhou, Xiaoyuan; Xu, Jingtao; Tang, Jun; Ang, Ran
2018-04-01
Not Available Project supported by the National Natural Science Foundation of China (Grant Nos. 51771126 and 11774247), the Youth Foundation of Science and Technology Department of Sichuan Province, China (Grant No. 2016JQ0051), Sichuan University Outstanding Young Scholars Research Funding (Grant No. 2015SCU04A20), the World First-Class University Construction Funding, and the Fundamental and Frontier Research Project in Chongqing (Grant No. CSTC2015JCYJBX0026).
Supervision of tunnelling constructions and software used for their evaluation
NASA Astrophysics Data System (ADS)
Caravanas, Aristotelis; Hilar, Matous
2017-09-01
Supervision is a common instrument for controlling constructions of tunnels. In order to suit relevant project’s purposes a supervision procedure is modified by local conditions, habits, codes and ways of allocating of a particular tunnelling project. The duties of tunnel supervision are specified in an agreement with the client and they can include a wide range of activities. On large scale tunnelling projects the supervision tasks are performed by a high number of people of different professions. Teamwork, smooth communication and coordination are required in order to successfully fulfil supervision tasks. The efficiency and quality of tunnel supervision work are enhanced when specialized software applications are used. Such applications should allow on-line data management and the prompt evaluation, reporting and sharing of relevant construction information and other aspects. The client is provided with an as-built database that contains all the relevant information related to a construction process, which is a valuable tool for the claim management as well as for the evaluation of structure defects that can occur in the future. As a result, the level of risks related to tunnel constructions is decreased.
Technical Basis of Scaling Relationships for the Pretreatment Engineering Platform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuhn, William L.; Arm, Stuart T.; Huckaby, James L.
Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities. The Pretreatment Engineering Platform (PEP) is being designed and constructed as part of a plan to respond to an issue raised by the WTP External Flowsheet Review Team (EFRT) entitled “Undemonstrated Leaching Processes” and numbered M12. The PEP replicates the WTP leaching process using prototypic equipment and control strategies. The approach for scaling PEP performance data to predict WTP performance is critical to the successful resolution of the EFRT issue. This report describesmore » the recommended PEP scaling approach, PEP data interpretation and provides recommendations on test conduct and data requirements.« less
Bench-Scale Filtration Testing in Support of the Pretreatment Engineering Platform (PEP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billing, Justin M.; Daniel, Richard C.; Kurath, Dean E.
Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP testing program specifies that bench-scale testing is to bemore » performed in support of specific operations, including filtration, caustic leaching, and oxidative leaching.« less
FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burger, Chris; Wortman, David; Brown, Chris
The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less
Post-project geomorphic assessment of a large process-based river restoration project
Erwin, Susannah O.; Schmidt, John C.; Allred, Tyler M.
2016-01-01
This study describes channel changes following completion of the Provo River Restoration Project (PRRP), the largest stream restoration project in Utah and one of the largest projects in the United States in which a gravel-bed river was fully reconstructed. We summarize project objectives and the design process, and we analyze monitoring data collected during the first 7 years after project completion. Post-project channel adjustment during the study period included two phases: (i) an initial phase of rapid, but small-scale, adjustment during the first years after stream flow was introduced to the newly constructed channel and (ii) a subsequent period of more gradual topographic adjustment and channel migration. Analysis of aerial imagery and ground-survey data demonstrate that the channel has been more dynamic in the downstream 4 km where a local source contributes a significant annual supply of bed material. Here, the channel migrates and exhibits channel adjustments that are more consistent with project objectives. The upstream 12 km of the PRRP are sediment starved, the channel has been laterally stable, and this condition may not be consistent with large-scale project objectives.
Are life satisfaction and self-esteem distinct constructs? A black South African perspective.
Westaway, Margaret S; Maluka, Constance S
2005-10-01
As part of a longitudinal project on Quality of Life, a study was undertaken to extend the applicability of the 5-item Satisfaction With Life Scale, developed in the USA, in South Africa. Data on basic sociodemographic characteristics, the scale, and the 10-item Rosenberg Self-esteem scale were available for 360 Black South Africans (151 men and 209 women), ages 21 to 83 years (M = 38.6 yr., SD = 10.3). Factor analysis applied to scale scores gave two factors, accounting for 71% of the variance. Factor I was loaded by 10 Self-esteem items and Factor II by four of the five Life Satisfaction items. Coefficient alpha was .77 for the Satisfaction With Life Scale and .97 for the Rosenberg Self-esteem Scale. Life Satisfaction was related to Self-esteem (r = .17, p < .01). It was concluded that Life Satisfaction and Self-esteem appear to be distinct, unitary constructs, but responses to Item 5 on the Satisfaction With Life Scale require cautious interpretation and may contribute to the weak r, although so may the collectivist culture of Black South Africans.
Constructing Ideologies and Valuing Nature in Two Eco-Cities
Eco-city development is flourishing as the scale and scope of environmental damage becomes increasingly clear. While there are no standard criteria of what constitutes an eco-city, the term has been increasingly applied to a number of different projects that straddle a broad arra...
A Scaled-Projective Measure of Interpersonal Values
ERIC Educational Resources Information Center
Kilmann, Ralph H.
1975-01-01
The Kilmann Insight Test is a measure of the interpersonal value constructs. That is how the individual perceives and interprets the desirable and undesirable features of interpersonal behavior. The validity of the test is investigated by explaining its relationship to a self-report measure assessing similar values. (DEP)
Educational Opportunities in the Global Village.
ERIC Educational Resources Information Center
Jenkins, John M.; Loveland, Tom
2000-01-01
Describes the Japan-Florida Teens Meet Project, an international program linking students at a Florida high school and a Japanese high school. Students were encouraged to e-mail their partners daily. The program also involved videoconferencing, a dollar/yen conversion exercise, and construction of space-station scale models. (MLH)
Large Wind Energy Converter: Growian 3 MW
NASA Technical Reports Server (NTRS)
Feustel, J. E.; Helm, S.; Koerber, F.
1980-01-01
The final report on the projected application of larger-scale wind turbine on the northern German coast is summarized. The designs of the tower, machinery housing, rotor, and rotor blades are described accompanied various construction materials are examined. Rotor blade adjustment devices auxiliary and accessory equipment are examined.
NASA Astrophysics Data System (ADS)
Zhu, Boqin
2015-08-01
The purpose of using unmanned aerial vehicle (UAV) remote sensing application in Five-hundred-meter aperture spherical telescope (FAST) project is to dynamically record the construction process with high resolution image, monitor the environmental impact, and provide services for local environmental protection and the reserve immigrants. This paper introduces the use of UAV remote sensing system and the course design and implementation for the FAST site. Through the analysis of the time series data, we found that: (1) since the year 2012, the project has been widely carried out; (2) till 2013, the internal project begun to take shape;(3) engineering excavation scope was kept stable in 2014, and the initial scale of the FAST engineering construction has emerged as in the meantime, the vegetation recovery went well on the bare soil area; (4) in 2015, none environmental problems caused by engineering construction and other engineering geological disaster were found in the work area through the image interpretation of UAV images. This paper also suggested that the UAV technology need some improvements to fulfill the requirements of surveying and mapping specification., including a new data acquisition and processing measures assigned with the background of highly diverse elevation, usage of telephoto camera, hierarchical photography with different flying height, and adjustment with terrain using the joint empty three settlement method.
Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sawab, Jamshaid; Lim, Ing; Mo, Yi-Lung
Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments andmore » mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.« less
Di Fabio, Annamaria; Kenny, Maureen E.
2016-01-01
The aim of the present study is to empirically test the theoretical model, Positive Self and Relational Management (PS&RM), for a sample of 184 Italian university students. The PS&RM model specifies the development of individuals' strengths, potentials, and talents across the lifespan and with regard to the dialect of self in relationship. PS&RM is defined theoretically by three constructs: Positive Lifelong Life Management, Positive Lifelong Self-Management, Positive Lifelong Relational Management. The three constructs are operationalized as follows: Positive Lifelong Life Management is measured by the Positive and Negative Affect Schedule (PANAS), the Satisfaction With Life Scale (SWLS), the Meaningful Life Measure (MLM), and the Authenticity Scale (AS); Positive Lifelong Self-Management is measured by the Intrapreneurial Self-Capital Scale (ISC), the Career Adapt-Abilities Scale (CAAS), and the Life Project Reflexivity Scale (LPRS); and Positive Lifelong Relational Management is measured by the Trait Emotional Intelligence Questionnaire (TEIQue), the Multidimensional Scale for Perceived Social Support (MSPSS), and the Positive Relational Management Scale (PRMS). Confirmatory factor analysis of the PS&RM model was completed using structural equation modeling. The theoretical PS&RM model was empirically tested as defined by the three hypothesized constructs. Empirical support for this model offers a framework for further research and the design of preventive interventions to promote decent work and decent lives in the twenty-first century. PMID:27047406
On the Reliability of Individual Brain Activity Networks.
Cassidy, Ben; Bowman, F DuBois; Rae, Caroline; Solo, Victor
2018-02-01
There is intense interest in fMRI research on whole-brain functional connectivity, and however, two fundamental issues are still unresolved: the impact of spatiotemporal data resolution (spatial parcellation and temporal sampling) and the impact of the network construction method on the reliability of functional brain networks. In particular, the impact of spatiotemporal data resolution on the resulting connectivity findings has not been sufficiently investigated. In fact, a number of studies have already observed that functional networks often give different conclusions across different parcellation scales. If the interpretations from functional networks are inconsistent across spatiotemporal scales, then the whole validity of the functional network paradigm is called into question. This paper investigates the consistency of resting state network structure when using different temporal sampling or spatial parcellation, or different methods for constructing the networks. To pursue this, we develop a novel network comparison framework based on persistent homology from a topological data analysis. We use the new network comparison tools to characterize the spatial and temporal scales under which consistent functional networks can be constructed. The methods are illustrated on Human Connectome Project data, showing that the DISCOH 2 network construction method outperforms other approaches at most data spatiotemporal resolutions.
Ogunlana, S; Yotsinsak, T; Yisa, S
2001-11-01
Many public and large-scale construction projects in Thailand have been faced with environmental and social conflict problems. The major cause is that project sponsors do not address concerns of the public in a proper manner during EIA study. The Yadana Natural Gas Pipeline (YNGP) project is an example of a project which suffered the effects of public demonstration. A public hearing, one technique of public participation, is a good mechanism to solve conflict problems in a non-violent way which the Thai Government usually adopts to settle conflict in construction projects. In the case of the YNGP, even after the conflict was 'resolved' hostility towards the project was not eliminated, as the opponents were not satisfied with the decision. Therefore, this article examines the hearing on the YNGP project. The study found that it was too late to make any significant changes to the project after the hearing was held, most respondents were not satisfied with the project. In other words, this hearing did not improve their perception of environmental soundness of the project. The study showed that the project's impact on the environment was not properly addressed. The project sponsors did not provide sufficient publicity for the meeting and the stage at which the hearing was conducted. Suggestions are made for improving participation in future hearings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leib, Thomas; Cole, Dan
In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less
The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lebon, P.; Bosgiraud, J.M.; Foin, R.
2013-07-01
The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequencesmore » anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)« less
Computational Everyday Life Human Behavior Model as Servicable Knowledge
NASA Astrophysics Data System (ADS)
Motomura, Yoichi; Nishida, Yoshifumi
A project called `Open life matrix' is not only a research activity but also real problem solving as an action research. This concept is realized by large-scale data collection, probabilistic causal structure model construction and information service providing using the model. One concrete outcome of this project is childhood injury prevention activity in new team consist of hospital, government, and many varieties of researchers. The main result from the project is a general methodology to apply probabilistic causal structure models as servicable knowledge for action research. In this paper, the summary of this project and future direction to emphasize action research driven by artificial intelligence technology are discussed.
Radio Propagation Prediction Software for Complex Mixed Path Physical Channels
2006-08-14
63 4.4.6. Applied Linear Regression Analysis in the Frequency Range 1-50 MHz 69 4.4.7. Projected Scaling to...4.4.6. Applied Linear Regression Analysis in the Frequency Range 1-50 MHz In order to construct a comprehensive numerical algorithm capable of
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... Statoil NA's proposed project, Hywind Maine, would consist of four 3-megawatt (MW) floating wind turbine... request by Statoil NA, is to construct a full-scale, deepwater floating wind turbine facility that... Prepare Environmental Impact Statements: Potential Commercial Wind Lease Issuance and Decision Regarding...
The Starkey habitat database for ungulate research: construction, documentation, and use.
Mary M. Rowland; Priscilla K. Coe; Rosemary J. Stussy; [and others].
1998-01-01
The Starkey Project, a large-scale, multidisciplinary research venture, began in 1987 in the Starkey Experimental Forest and Range in northeast Oregon. Researchers are studying effects of forest management on interactions and habitat use of mule deer (Odocoileus hemionus hemionus), elk (Cervus elaphus nelsoni), and cattle. A...
Improving Collaborative Learning in Online Software Engineering Education
ERIC Educational Resources Information Center
Neill, Colin J.; DeFranco, Joanna F.; Sangwan, Raghvinder S.
2017-01-01
Team projects are commonplace in software engineering education. They address a key educational objective, provide students critical experience relevant to their future careers, allow instructors to set problems of greater scale and complexity than could be tackled individually, and are a vehicle for socially constructed learning. While all…
Code of Federal Regulations, 2014 CFR
2014-07-01
... means any object or assemblage of objects, regardless of age, whether in situ or not, that may carry... structure made up of interdependent and interrelated parts in a definite pattern or organization. Constructed by humans, it is often an engineering project large in scale. An aircraft wreck or shipwreck is a...
NASA Astrophysics Data System (ADS)
Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui
2010-06-01
The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.
Grid-Scale Energy Storage Demonstration of Ancillary Services Using the UltraBattery Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seasholtz, Jeff
2015-08-20
The collaboration described in this document is being done as part of a cooperative research agreement under the Department of Energy’s Smart Grid Demonstration Program. This document represents the Final Technical Performance Report, from July 2012 through April 2015, for the East Penn Manufacturing Smart Grid Program demonstration project. This Smart Grid Demonstration project demonstrates Distributed Energy Storage for Grid Support, in particular the economic and technical viability of a grid-scale, advanced energy storage system using UltraBattery ® technology for frequency regulation ancillary services and demand management services. This project entailed the construction of a dedicated facility on the Eastmore » Penn campus in Lyon Station, PA that is being used as a working demonstration to provide regulation ancillary services to PJM and demand management services to Metropolitan Edison (Met-Ed).« less
Energy Evaluation of a New Construction Pilot Community: Fresno, California
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burdick, A.; Poerschke, A.; Rapport, A.
2014-06-01
A new construction pilot community was constructed by builder-partner Wathen-Castanos Hybrid Homes (WCHH) based on a single occupied test house that was designed to achieve greater than 30% energy savings with respect to the House Simulation Protocols (Hendron, Robert; Engebrecht, Cheryn (2010). Building America House Simulation Protocols. Golden, CO: National Renewable Energy Laboratory). Builders face several key problems when implementing a whole-house systems integrated measures package (SIMP) from a single test house into multiple houses. Although a technical solution already may have been evaluated and validated in an individual test house, the potential exists for constructability failures at the communitymore » scale. This report addresses factors of implementation and scalability at the community scale and proposes methodologies by which community-scale energy evaluations can be performed based on results at the occupied test house level. Research focused on the builder and trade implementation of a SIMP and the actual utility usage in the houses at the community scale of production. Five occupants participated in this community-scale research by providing utility bills and information on occupancy and miscellaneous gas and electric appliance use for their houses. IBACOS used these utility data and background information to analyze the actual energy performance of the houses. Verification with measured data is an important component in predictive energy modeling. The actual utility bill readings were compared to projected energy consumption using BEopt with actual weather and thermostat set points for normalization.« less
Computational nuclear quantum many-body problem: The UNEDF project
NASA Astrophysics Data System (ADS)
Bogner, S.; Bulgac, A.; Carlson, J.; Engel, J.; Fann, G.; Furnstahl, R. J.; Gandolfi, S.; Hagen, G.; Horoi, M.; Johnson, C.; Kortelainen, M.; Lusk, E.; Maris, P.; Nam, H.; Navratil, P.; Nazarewicz, W.; Ng, E.; Nobre, G. P. A.; Ormand, E.; Papenbrock, T.; Pei, J.; Pieper, S. C.; Quaglioni, S.; Roche, K. J.; Sarich, J.; Schunck, N.; Sosonkina, M.; Terasaki, J.; Thompson, I.; Vary, J. P.; Wild, S. M.
2013-10-01
The UNEDF project was a large-scale collaborative effort that applied high-performance computing to the nuclear quantum many-body problem. The primary focus of the project was on constructing, validating, and applying an optimized nuclear energy density functional, which entailed a wide range of pioneering developments in microscopic nuclear structure and reactions, algorithms, high-performance computing, and uncertainty quantification. UNEDF demonstrated that close associations among nuclear physicists, mathematicians, and computer scientists can lead to novel physics outcomes built on algorithmic innovations and computational developments. This review showcases a wide range of UNEDF science results to illustrate this interplay.
Underwater acoustic positioning system for the SMO and KM3NeT - Italia projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Viola, S.; Barbagallo, G.; Cacopardo, G.
In the underwater neutrino telescopes, the positions of the Cherenkov light sensors and their movements must be known with an accuracy of few tens of centimetres. In this work, the activities of the SMO and KM3NeT-Italia teams for the development of an acoustic positioning system for KM3NeT-Italia project are presented. The KM3NeT-Italia project foresees the construction, within two years, of 8 towers in the view of the several km{sup 3}-scale neutrino telescope KM3NeT.
2006-09-01
second phase of the project was modified to incorporate a soft solution design. The plan consisted of construction of a wave diffraction mound to reduce...and local public property (that is considered as private) in the U.S. Court of Federal Claims. An RSM approach was followed in this study...representation of hard bottom (non-erodible areas), and hot-start option. M2D has been designed as a local- scale model that can be easily and quickly
1992-03-01
construction were completed and data, "’dm blue prints and physical measurements, was entered concurrent with the coding of routines for data retrieval. While...desirable for that view to accurately reflect what a person (or camera) would see if they were to stand at the same point in the physical world. To... physical dimensions. A parallel projection does not perform this scaling and is therefore not suitable to our application. B. GENERAL PERSPECTIVE
Improvements in SMR Modular Construction through Supply Chain Optimization and Lessons Learned
DOE Office of Scientific and Technical Information (OSTI.GOV)
White III, Chelsea C.; Petrovic, Bojan
Affordable energy is a critical societal need. Capital construction cost is a significant portion of nuclear energy cost. By controlling and reducing cost, companies can build more competitive nuclear power plants and hence provide access to more affordable energy. Modular construction provides an opportunity to reduce the cost of construction, and as projects scale up in number, the cost of each unit can be further reduced. The objective of this project was to advance design and construction methods for manufacturing Small Modular Reactors (SMRs), and in particular to improve modular construction techniques and develop best practices for designing and operatingmore » supply chains that take advantage of these techniques. The overarching objectives were to accelerate the construction schedule and reduce its variability, reduce the cost of construction, reduce interest costs accrued during construction (IDC), and thus enhance the economic attractiveness of SMRs. Our fundamental measure of merit was total capital investment cost (TCIC). To achieve these objectives, this project developed a decision support system, EVAL, to support identifying, addressing, and resolving or ameliorating challenges and deficiencies in the current modular construction approach. The results of this effort were consistent with the facts that the cost of a construction activity is often smallest when accomplished in the factory, greatest when accomplished at the construction site, and at an intermediate level when accomplished at an assembly area close to the construction site. Further, EVAL can aid in providing insight into ways to reduce waste, improve quality, efficiency, and throughput and reflects the fact that the more done early in the construction process, i.e., in the factory, the more upfront funding is required and hence the more IDC will be accrued. The analysis has lead to a better understanding of circumstances under which modular construction performed mainly in the factory will result in lower expected total cost, relative to more traditional, on-site construction procedures. Further, we anticipate that EVAL can be used to gain insight regarding what role standardization can play in order for modularization to be most effectively defined. Such results would ultimately benefit all (small and large) new nuclear construction.« less
NASA Astrophysics Data System (ADS)
Burgos-Martin, J.; Sanchez-Padron, M.; Sanchez, F.; Martinez-Roger, Carlos
2004-07-01
Large-Scale observing facilities are scarce and costly. Even so, the perspective to enlarge or to increase the number of these facilities are quite real and several projects are undertaking their first steps in this direction. These costly facilities require the cooperation of highly qualified institutions, able to undertake the project from the scientific and technological point of view, as well as the vital collaboration and effective support of several countries, at the highest level, able to provide the necessary investment for their construction. Because of these technological implications and the financial magnitude of these projects, their impact goes well beyond the international astrophysical community. We propose to carry out a study on the socio-economic impact from the construction and operation of an Extremely Large Telescope of class 30 - 100 m. We plan to approach several aspects such as its impact in the promotion of the employment; social, educational and cultural integration of the population; the impulse of industries; its impact on the national and international policies on research; environmental issues; etc. We will also analyze the financial instruments available, and those special aids only accessible for some countries and regions to encourage their participation in projects of this magnitude.
Assessing the sustainable construction of large construction companies in Malaysia
NASA Astrophysics Data System (ADS)
Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nasrun, Mohd Nawi Mohd
2016-08-01
Considering the increasing concerns for the consideration of sustainability issues in construction project delivery within the construction industry, this paper assesses the extent of sustainable construction among Malaysian large contractors, in order to ascertain the level of the industry's impacts on both the environment and the society. Sustainable construction explains the construction industry's responsibility to efficiently utilise the finite resources while also reducing construction impacts on both humans and the environment throughout the phases of construction. This study used proportionate stratified random sampling to conduct a field study with a sample of 172 contractors out of the 708 administered questionnaires. Data were collected from large contractors in the eleven states of peninsular Malaysia. Using the five-level rating scale (which include: 1= Very Low; 2= Low; 3= Moderate; 4= High; 5= Very High) to describe the level of sustainable construction of Malaysian contractors based on previous studies, statistical analysis reveals that environmental, social and economic sustainability of Malaysian large contractors are high.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elliott, Douglas C.; Olarte, Mariefel V.; Hart, Todd R.
2015-06-19
DOE-EE Bioenergy Technologies Office has set forth several goals to increase the use of bioenergy and bioproducts derived from renewable resources. One of these goals is to facilitate the implementation of the biorefinery. The biorefinery will include the production of liquid fuels, power and, in some cases, products. The integrated biorefinery should stand-alone from an economic perspective with fuels and power driving the economy of scale while the economics/profitability of the facility will be dependent on existing market conditions. UOP LLC proposed to demonstrate a fast pyrolysis based integrated biorefinery. Pacific Northwest National Laboratory (PNNL) has expertise in an importantmore » technology area of interest to UOP for use in their pyrolysis-based biorefinery. This CRADA project provides the supporting technology development and demonstration to allow incorporation of this technology into the biorefinery. PNNL developed catalytic hydrothermal gasification (CHG) for use with aqueous streams within the pyrolysis biorefinery. These aqueous streams included the aqueous phase separated from the fast pyrolysis bio-oil and the aqueous byproduct streams formed in the hydroprocessing of the bio-oil to finished products. The purpose of this project was to demonstrate a technically and economically viable technology for converting renewable biomass feedstocks to sustainable and fungible transportation fuels. To demonstrate the technology, UOP constructed and operated a pilot-scale biorefinery that processed one dry ton per day of biomass using fast pyrolysis. Specific objectives of the project were to: The anticipated outcomes of the project were a validated process technology, a range of validated feedstocks, product property and Life Cycle data, and technical and operating data upon which to base the design of a full-scale biorefinery. The anticipated long-term outcomes from successful commercialization of the technology were: (1) the replacement of a significant fraction of petroleum based fuels with advanced biofuels, leading to increased energy security and decreased carbon footprint; and (2) establishment of a new biofuel industry segment, leading to the creation of U.S. engineering, manufacturing, construction, operations and agricultural jobs. PNNL development of CHG progressed at two levels. Initial tests were made in the laboratory in both mini-scale and bench-scale continuous flow reactor systems. Following positive results, the next level of evaluation was in the scaled-up engineering development system, which was operated at PNNL.« less
Teacher change in implementing a research-developed representation construction pedagogy
NASA Astrophysics Data System (ADS)
Hubber, Peter; Chittleborough, Gail
2016-05-01
The Representations in Learning Science (RiLS) project developed a representation construction approach to teaching and learning in science, which has successfully demonstrated enhanced student learning through sustained engagement with ideas, and enhancement of teachers' pedagogical knowledge and understandings of how knowledge in science is developed and communicated. The current Constructing Representations in Science Pedagogy (CRISP) project aims at wider scale implementation of the representation construction approach. This paper explores a range of issues that confronted four Year-8 teachers in implementing this research-developed approach, such as: preparedness of the teacher in terms of epistemological positioning and positioning as a learner, significant support for planning and modelling by the university expert, and a team ethos where teachers share ideas and plan jointly. The Year-8 teachers implemented a representation construction approach to the teaching of the topic of astronomy. The Interconnected Model of Teacher Growth (IMTG) (Clarke and Hollingworth, Teach. Educ., 18 (2001) 947) was used to analyse the teachers' experience in planning and delivering the teaching sequence. This model was found to be flexible in identifying the experiences of teachers in different situations and useful in identifying issues for implementation of a research-developed pedagogy.
The Impact of Rosenwald Schools on Black Achievement. WP 2009-26
ERIC Educational Resources Information Center
Aaronson, Daniel; Mazumder, Bhashkar
2009-01-01
The Black-White gap in completed schooling among Southern born men narrowed sharply between the World Wars after being stagnant from 1880 to 1910. We examine a large scale school construction project, the Rosenwald Rural Schools Initiative, which was designed to dramatically improve the educational opportunities for Southern rural Blacks. From…
DOT National Transportation Integrated Search
1971-01-01
The project designated "Concrete Durability Studies" comprises case studies of unusual durability, either in kind or extent. These case studies are directed toward situations in which appearances suggest materials or construction rather than structur...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
...'s planned Delaware and New Jersey Offshore Wind Parks. The purpose of installing the MDCFs is to determine the feasibility of a commercial-scale offshore wind energy park at the proposed project site... collected during offshore wind farm construction in European waters to estimate the distances to NMFS...
NASA Astrophysics Data System (ADS)
Kavka, Petr; Zumr, David; Neumann, Martin; Lidmila, Martin; Dufka, Dušan
2017-04-01
Soil erosion of the slopes along the linear construction sites, such as railroads, roads, pipelines or watercourses, is usually underestimated by the construction companies and controlling authorities. But under certain circumstances, when the construction site is not maintained and protected properly, a large amounts of soil may be transported from the sites to the surrounding environment during the intensive rainfall. Transported sediment, often carrying adsorbed pollutants, may reach watercourses and cause water recipient siltation and pollution. Within the applied research project we investigate ways of low cost, quick and easy technical measures that would help to protect the slopes against the splash erosion, rills development and sliding. The methodology is based on testing of various permeable covers, sheets, anchoring and patchy vegetation on a plot and hillslope scales. In this contribution we will present the experimental plot setup, consisting of large soil blocks encapsulated in the monitored steel containers and nozzle rainfall simulator. The presentation is funded by the Technological Agency of the Czech Republic (research project TH02030428) and an internal student CTU grant.
Evaluation of constructed wetland treatment performance for winery wastewater.
Grismer, Mark E; Carr, Melanie A; Shepherd, Heather L
2003-01-01
Rapid expansion of wineries in rural California during the past three decades has created contamination problems related to winery wastewater treatment and disposal; however, little information is available about performance of on-site treatment systems. Here, the project objective was to determine full-scale, subsurface-flow constructed wetland retention times and treatment performance through assessment of water quality by daily sampling of total dissolved solids, pH, total suspended solids, chemical oxygen demand (COD), tannins, nitrate, ammonium, total Kjeldahl nitrogen, phosphate, sulfate, and sulfide across operating systems for winery wastewater treatment. Measurements were conducted during both the fall crush season of heavy loading and the spring following bottling and racking operations at the winery. Simple decay model coefficients for these constituents as well as COD and tannin removal efficiencies from winery wastewater in bench-scale reactors are also determined. The bench-scale study used upward-flow, inoculated attached-growth (pea-gravel substrate) reactors fed synthetic winery wastewater. Inlet and outlet tracer studies for determination of actual retention times were essential to analyses of treatment performance from an operational subsurface-flow constructed wetland that had been overloaded due to failure to install a pretreatment system for suspended solids removal. Less intensive sampling conducted at a smaller operational winery wastewater constructed wetland that had used pretreatment suspended solids removal and aeration indicated that the constructed wetlands were capable of complete organic load removal from the winery wastewater.
NASA Astrophysics Data System (ADS)
Plaisant, A.; Maggio, E.; Pettinau, A.
2016-12-01
The deep aquifer located at a depth of about 1000-1500 m within fractured carbonate in the Sulcis coal basin (South-West Sardinia, Italy) constitutes a potential reservoir to develop a pilot-scale CO2 storage site. The occurrence of several coal mines and the geology of the basin also provide favourable condition to install a permanent infrastructures where advanced CO2 storage technologies can be developed. Overall, the Sulcis project will allow to characterize the Sulcis coal basin (South West Sardinia, Italy) and to develop a permanent infrastructure (know-how, equipment, laboratories, etc.) for advanced international studies on CO2 storage. The research activities are structured in two different phases: (i) site characterization, including the construction of an underground and a fault laboratories and (ii) the installation of a test site for small-scale injection of CO2. In particular, the underground laboratory will host geochemical and geophysical experiments on rocks, taking advantages of the buried environment and the very well confined conditions in the galleries; in parallel, the fault laboratory will be constructed to study CO2 leakage phenomena in a selected fault. The project is currently ongoing and some preliminary results will be presented in this work as well as the structure of the project as a whole. More in detail, preliminary activities comprise: (i) geochemical monitoring; (ii) the minero-petrographycal, physical and geophysical characterization of the rock samples; (iii) the development of both static and dynamic geological models of the reservoir; (iv) the structural geology and fault analysis; (v) the assessment of natural seismicity through a monitoring network (vi) the re-processing and the analysis of the reflection seismic data. Future activities will comprise: (i) the drilling of shallow exploration wells near the faults; (ii) the construction of both the above mentioned laboratories; (iii) drilling of a deep exploration well (1,500 m); (iv) injection tests. Preliminary analyses show that the rocks of the carbonate formation present a low porosity, but the formation is characterized by a good permeability for fractures and karst. The faults are typically sealed and petrophysical properties of caprock and reservoir are spatially heterogeneous.
NASA Astrophysics Data System (ADS)
Kortenkamp, Stephen J.; Brock, Laci
2016-10-01
Scale model solar systems have been used for centuries to help educate young students and the public about the vastness of space and the relative sizes of objects. We have adapted the classic scale model solar system activity into a student-driven project for an undergraduate general education astronomy course at the University of Arizona. Students are challenged to construct and use their three dimensional models to demonstrate an understanding of numerous concepts in planetary science, including: 1) planetary obliquities, eccentricities, inclinations; 2) phases and eclipses; 3) planetary transits; 4) asteroid sizes, numbers, and distributions; 5) giant planet satellite and ring systems; 6) the Pluto system and Kuiper belt; 7) the extent of space travel by humans and robotic spacecraft; 8) the diversity of extrasolar planetary systems. Secondary objectives of the project allow students to develop better spatial reasoning skills and gain familiarity with technology such as Excel formulas, smart-phone photography, and audio/video editing.During our presentation we will distribute a formal description of the project and discuss our expectations of the students as well as present selected highlights from preliminary submissions.
Materials for advanced ultrasupercritical steam turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Purgert, Robert; Shingledecker, John; Saha, Deepak
The U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) have sponsored a project aimed at identifying, evaluating, and qualifying the materials needed for the construction of the critical components of coal-fired power plants capable of operating at much higher efficiencies than the current generation of supercritical plants. This increased efficiency is expected to be achieved principally through the use of advanced ultrasupercritical (A-USC) steam conditions. A limiting factor in this can be the materials of construction for boilers and for steam turbines. The overall project goal is to assess/develop materials technology that will enable achieving turbinemore » throttle steam conditions of 760°C (1400°F)/35MPa (5000 psi). This final technical report covers the research completed by the General Electric Company (GE) and Electric Power Research Institute (EPRI), with support from Oak Ridge National Laboratory (ORNL) and the National Energy Technology Laboratory (NETL) – Albany Research Center, to develop the A-USC steam turbine materials technology to meet the overall project goals. Specifically, this report summarizes the industrial scale-up and materials property database development for non-welded rotors (disc forgings), buckets (blades), bolting, castings (needed for casing and valve bodies), casting weld repair, and casting to pipe welding. Additionally, the report provides an engineering and economic assessment of an A-USC power plant without and with partial carbon capture and storage. This research project successfully demonstrated the materials technology at a sufficient scale and with corresponding materials property data to enable the design of an A-USC steam turbine. The key accomplishments included the development of a triple-melt and forged Haynes 282 disc for bolted rotor construction, long-term property development for Nimonic 105 for blading and bolting, successful scale-up of Haynes 282 and Nimonic 263 castings using traditional sand foundry practices, and a techno-economic study of an A-USC plant including cost estimates for an A-USC turbine which showed A-USC to be economically attractive for partial carbon and capture compared to today’s USC technology. Based on this successful materials research and a review with U.S. utility stakeholders, a new project to develop a component test facility (ComTest) including the world’s first A-USC turbine has been proposed to continue the technology development.« less
2009-01-01
Background Insertional mutagenesis is an effective method for functional genomic studies in various organisms. It can rapidly generate easily tractable mutations. A large-scale insertional mutagenesis with the piggyBac (PB) transposon is currently performed in mice at the Institute of Developmental Biology and Molecular Medicine (IDM), Fudan University in Shanghai, China. This project is carried out via collaborations among multiple groups overseeing interconnected experimental steps and generates a large volume of experimental data continuously. Therefore, the project calls for an efficient database system for recording, management, statistical analysis, and information exchange. Results This paper presents a database application called MP-PBmice (insertional mutation mapping system of PB Mutagenesis Information Center), which is developed to serve the on-going large-scale PB insertional mutagenesis project. A lightweight enterprise-level development framework Struts-Spring-Hibernate is used here to ensure constructive and flexible support to the application. The MP-PBmice database system has three major features: strict access-control, efficient workflow control, and good expandability. It supports the collaboration among different groups that enter data and exchange information on daily basis, and is capable of providing real time progress reports for the whole project. MP-PBmice can be easily adapted for other large-scale insertional mutation mapping projects and the source code of this software is freely available at http://www.idmshanghai.cn/PBmice. Conclusion MP-PBmice is a web-based application for large-scale insertional mutation mapping onto the mouse genome, implemented with the widely used framework Struts-Spring-Hibernate. This system is already in use by the on-going genome-wide PB insertional mutation mapping project at IDM, Fudan University. PMID:19958505
Photovoltaic balance-of-system designs and costs at PVUSA
NASA Astrophysics Data System (ADS)
Reyes, A. B.; Jennings, C.
1995-05-01
This report is one in a series of 1994-1995 PVUSA reports that document PVUSA lessons learned at demonstration sites in California and Texas. During the last 7 years (1988 to 1994), 16 PV systems ranging from 20 kW to 500 kW have been installed. Six 20-kW emerging module technology (EMT) arrays and three turnkey (i.e., vendor designed and integrated) utility-scale systems were procured and installed at PVUSA's main test site in Davis, California. PVUSA host utilities have installed a total of seven EMT arrays and utility-scale systems in their service areas. Additional systems at Davis and host utility sites are planned. One of PVUSA's key objectives is to evaluate the performance, reliability, and cost of PV balance-of-system (BOS). In the procurement stage PVUSA encouraged innovative design to improve upon present practice by reducing maintenance, improving reliability, or lowering manufacturing or construction costs. The project team worked closely with suppliers during the design stage not only to ensure designs met functional and safety specifications, but to provide suggestions for improvement. This report, intended for the photovoltaic (PV) industry and for utility project managers and engineers considering PV plant construction and ownership, documents PVUSA utility-scale system design and cost lessons learned. Complementary PVUSA topical reports document: construction and safety experience; five-year assessment of EMTs; validation of the Kerman 500-kW grid-support PV plant benefits; PVUSA instrumentation and data analysis techniques; procurement, acceptance, and rating practices for PV power plants; experience with power conditioning units and power quality.
NASA Technical Reports Server (NTRS)
Smith, J. L.
1978-01-01
An analysis is given of the Low-Cost Silicon Solar Array Project plans for the industrialization of new production technologies expected to be forthcoming as a result of the project's technology development efforts. In particular, LSSA's mandate to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 is critically examined. The examination focuses on one of the concerns behind this goal -- timely development of industrial capacity to supply anticipated demand. Some of the conclusions include: (1) construction of small-scale pilot plants should be undertaken only for purposes of technology development; (2) large-scale demonstrations should be undertaken only when the technology is well in hand; (3) commercial-scale production should be left to the private sector; (4) the 500-MW annual output goal should be shifted to Program Headquarters.
[Scale effect of Li-Xiang Railway construction impact on landscape pattern and its ecological risk].
Wang, De-zhi; Qiu, Peng-hua; Fang, Yuan-min
2015-08-01
As a large corridor project, plateau railway has multiple points and passes various sensitive environments along the railway. The determination of the scope of impact on ecological environment from railway construction is often controversial in ecological impact assessment work. Taking the Tangbu-Jiantang section of Li-Xiang Railway as study object, and using present land use map (1:10000) in 2012 and DEM as data sources, corridor cutting degree index ( CCI) and cumulative effect index of corridor (CCEI) were established by topology, buffer zone and landscape metrics methods. Besides, the ecological risk index used for railway construction was improved. By quantitative analysis of characteristics of the spatio-temporal change of landscape pattern and its evolution style at different spatial scales before and after railway construction, the most appropriate evaluation scale of the railway was obtained. Then the characteristics of the spatio-temporal variation of ecological risk within this scale before and after railway construction were analyzed. The results indicated that the cutting model and degree of railway corridor to various landscape types could be effectively reflected by CCI, and the exposure and harm relations between risk sources and risk receptors of railway can be measured by CCEI. After the railway construction, the railway corridor would cause a great deal of middle cutting effect on the landscape along the railroad, which would influence wood land and grassland landscape most greatly, while would cause less effect of edge cutting and internal cutting. Landscape indices within the 600 m buffer zone demonstrated the most obvious scale effect, therefore, the 600 m zone of the railway was set as the most suitable range of ecological impact assessment. Before railway construction, the low ecological risk level covered the biggest part of the 600 m assessment zone. However, after the railway construction, the ecological risk increased significantly, and the most part of the study area was at the moderate ecological risk level. The ecological risk presented ring-shaped and multi-kernel patterns, and was lower in the southern part than in the northern part of the study area.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, R.R.; Staub, W.P.
1993-08-01
Two environmental assessments considered the potential cumulative environmental impacts resulting from the development of eight proposed hydropower projects in the Nooksack River Basin and 11 proposed projects in the Skagit River Basin, North Cascades, Washington, respectively. While not identified as a target resource, slope stability and the alteration of sediment supply to creeks and river mainstems significantly affect other resources. The slope stability assessment emphasized the potential for cumulative impacts under disturbed conditions (e.g., road construction and timber harvesting) and a landslide-induced pipeline rupture scenario. In the case of small-scale slides, the sluicing action of ruptured pipeline water on themore » fresh landslide scarp was found to be capable of eroding significantly more material than the original landslide. For large-scale landslides, sluiced material was found to be a small increment of the original landslide. These results predicted that hypothetical accidental pipeline rupture by small-scale landslides may result in potential cumulative impacts for 12 of the 19 projects with pending license applications in both river basins. 5 refs., 2 tabs.« less
From the past to the future: Integrating work experience into the design process.
Bittencourt, João Marcos; Duarte, Francisco; Béguin, Pascal
2017-01-01
Integrating work activity issues into design process is a broadly discussed theme in ergonomics. Participation is presented as the main means for such integration. However, a late participation can limit the development of both project solutions and future work activity. This article presents the concept of construction of experience aiming at the articulated development of future activities and project solutions. It is a non-teleological approach where the initial concepts will be transformed by the experience built up throughout the design process. The method applied was a case study of an ergonomic participation during the design of a new laboratory complex for biotechnology research. Data was obtained through analysis of records in a simulation process using a Lego scale model and interviews with project participants. The simulation process allowed for developing new ways of working and generating changes in the initial design solutions, which enable workers to adopt their own developed strategies for conducting work more safely and efficiently in the future work system. Each project decision either opens or closes a window of opportunities for developing a future activity. Construction of experience in a non-teleological design process allows for understanding the consequences of project solutions for future work.
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Sources of Score Scale Inconsistency. Research Report. ETS RR-11-35
ERIC Educational Resources Information Center
Fife, James H.; Graf, Edith Aurora; Ohls, Sarah
2011-01-01
Six tasks, selected from assessments administered in 2007 as part of the Cognitively-Based Assessments of, for, and as Learning (CBAL) project, were revised in an effort to remove difficulties with the tasks that were unrelated to the construct being assessed. Because the revised tasks were piloted on a different population from the original…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mendelsohn, M.; Lowder, T.; Canavan, B.
Over the last several years, solar energy technologies have been, or are in the process of being, deployed at unprecedented levels. A critical recent development, resulting from the massive scale of projects in progress or recently completed, is having the power sold directly to electric utilities. Such 'utility-scale' systems offer the opportunity to deploy solar technologies far faster than the traditional 'behind-the-meter' projects designed to offset retail load. Moreover, these systems have employed significant economies of scale during construction and operation, attracting financial capital, which in turn can reduce the delivered cost of power. This report is a summary ofmore » the current U.S. utility-scale solar state-of-the-market and development pipeline. Utility-scale solar energy systems are generally categorized as one of two basic designs: concentrating solar power (CSP) and photovoltaic (PV). CSP systems can be further delineated into four commercially available technologies: parabolic trough, central receiver (CR), parabolic dish, and linear Fresnel reflector. CSP systems can also be categorized as hybrid, which combine a solar-based system (generally parabolic trough, CR, or linear Fresnel) and a fossil fuel energy system to produce electric power or steam.« less
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates, Eric Silagy, Florida Power & Light Company vice president and chief development officer, for his part in the construction of NASA's first large-scale solar power generation facility as Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, Kennedy Director Bob Cabana, left, congratulates Roderick Roche, senior manager, Project Management Office of North America, SunPower Corporation, for his part in the construction of NASA's first large-scale solar power generation facility as Eric Silagy, Florida Power & Light Company vice president and chief development officer, looks on. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2014-10-01
A new construction pilot community was constructed by builder-partner Wathen-Castanos Hybrid Homes (WCHH) based on a single occupied test house that was designed to achieve greater than 30% energy savings with respect to the House Simulation Protocols (Hendron, Robert; Engebrecht, Cheryn (2010). Building America House Simulation Protocols. Golden, CO: National Renewable Energy Laboratory.). Builders face several key problems when implementing a whole-house systems integrated measures package (SIMP) from a single test house into multiple houses. Although a technical solution already may have been evaluated and validated in an individual test house, the potential exists for constructability failures at the communitymore » scale. This report addresses factors of implementation and scalability at the community scale and proposes methodologies by which community-scale energy evaluations can be performed based on results at the occupied test house level. Research focused on the builder and trade implementation of a SIMP and the actual utility usage in the houses at the community scale of production. Five occupants participated in this community-scale research by providing utility bills and information on occupancy and miscellaneous gas and electric appliance use for their houses. IBACOS used these utility data and background information to analyze the actual energy performance of the houses. Verification with measured data is an important component in predictive energy modeling. The actual utility bill readings were compared to projected energy consumption using BEopt with actual weather and thermostat set points for normalization.« less
Overview and status of the Giant Magellan Telescope Project
NASA Astrophysics Data System (ADS)
McCarthy, Patrick J.; Fanson, James; Bernstein, Rebecca; Ashby, David; Bigelow, Bruce; Boyadjian, Nune; Bouchez, Antonin; Chauvin, Eric; Donoso, Eduardo; Filgueira, Jose; Goodrich, Robert; Groark, Frank; Jacoby, George; Pearce, Eric
2016-08-01
The Giant Magellan Telescope Project is in the construction phase. Production of the primary mirror segments is underway with four of the seven required 8.4m mirrors at various stages of completion and materials purchased for segments five and six. Development of the infrastructure at the GMT site at Las Campanas is nearing completion. Power, water, and data connections sufficient to support the construction of the telescope and enclosure are in place and roads to the summit have been widened and graded to support transportation of large and heavy loads. Construction pads for the support buildings have been graded and the construction residence is being installed. A small number of issues need to be resolved before the final design of the telescope structure and enclosure can proceed and the GMT team is collecting the required inputs to the decision making process. Prototyping activities targeted at the active and adaptive optics systems are allowing us to finalize designs before large scale production of components begins. Our technically driven schedule calls for the telescope to be assembled on site in 2022 and to be ready to receive a subset of the primary and secondary mirror optics late in the year. The end date for the project is coupled to the delivery of the final primary mirror segments and the adaptive secondary mirrors that support adaptive optics operations.
Developing a validation for environmental sustainability
NASA Astrophysics Data System (ADS)
Adewale, Bamgbade Jibril; Mohammed, Kamaruddeen Ahmed; Nawi, Mohd Nasrun Mohd; Aziz, Zulkifli
2016-08-01
One of the agendas for addressing environmental protection in construction is to reduce impacts and make the construction activities more sustainable. This important consideration has generated several research interests within the construction industry, especially considering the construction damaging effects on the ecosystem, such as various forms of environmental pollution, resource depletion and biodiversity loss on a global scale. Using Partial Least Squares-Structural Equation Modeling technique, this study validates environmental sustainability (ES) construct in the context of large construction firms in Malaysia. A cross-sectional survey was carried out where data was collected from Malaysian large construction firms using a structured questionnaire. Results of this study revealed that business innovativeness and new technology are important in determining environmental sustainability (ES) of the Malaysian construction firms. It also established an adequate level of internal consistency reliability, convergent validity and discriminant validity for each of this study's constructs. And based on this result, it could be suggested that the indicators for organisational innovativeness dimensions (business innovativeness and new technology) are useful to measure these constructs in order to study construction firms' tendency to adopt environmental sustainability (ES) in their project execution.
Applications of turbidity monitoring to forest management in California.
Harris, Richard R; Sullivan, Kathleen; Cafferata, Peter H; Munn, John R; Faucher, Kevin M
2007-09-01
Many California streams have been adversely affected by sedimentation caused by historic and current land uses, including timber harvesting. The impacts of timber harvesting and logging transportation systems on erosion and sediment delivery can be directly measured, modeled, or inferred from water quality measurements. California regulatory agencies, researchers, and land owners have adopted turbidity monitoring to determine effects of forest management practices on suspended sediment loads and water quality at watershed, project, and site scales. Watershed-scale trends in sediment discharge and responses to current forest practices may be estimated from data collected at automated sampling stations that measure turbidity, stream flow, suspended sediment concentrations, and other water quality parameters. Future results from these studies will provide a basis for assessing the effectiveness of modern forest practice regulations in protecting water quality. At the project scale, manual sampling of water column turbidity during high stream flow events within and downstream from active timber harvest plans can identify emerging sediment sources. Remedial actions can then be taken by managers to prevent or mitigate water quality impacts. At the site scale, manual turbidity sampling during storms or high stream flow events at sites located upstream and downstream from new, upgraded, or decommissioned stream crossings has proven to be a valuable way to determine whether measures taken to prevent post-construction erosion and sediment production are effective. Turbidity monitoring at the project and site scales is therefore an important tool for adaptive management. Uncertainty regarding the effects of current forest practices must be resolved through watershed-scale experiments. In the short term, this uncertainty will stimulate increased use of project and site-scale monitoring.
NASA Astrophysics Data System (ADS)
Kargin, Vladislav
2018-06-01
We introduce a family of three-dimensional random point fields using the concept of the quaternion determinant. The kernel of each field is an n-dimensional orthogonal projection on a linear space of quaternionic polynomials. We find explicit formulas for the basis of the orthogonal quaternion polynomials and for the kernel of the projection. For number of particles n → ∞, we calculate the scaling limits of the point field in the bulk and at the center of coordinates. We compare our construction with the previously introduced Fermi-sphere point field process.
Review of NASA's Hypersonic Research Engine Project
NASA Technical Reports Server (NTRS)
Andrews, Earl H.; Mackley, Ernest A.
1993-01-01
The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.
Wind Turbines in the Built Environment: Summary of a Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tinnesand, Heidi; Baring-Gould, Ian; Fields, Jason
2016-09-28
Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. The findings presented in this presentation cannot be extended to wind energy deployments in general because of the large difference in application and technology maturity. This presentation summarizes the results of a report investigating the current state of the BEWT industrymore » by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology. The authors generated a series of case studies that outlines the pertinent project details, project outcomes, and lessons learned.« less
NASA Astrophysics Data System (ADS)
Epstein, J.; Lind, P.
2017-12-01
Secondary channels provide critical off-channel habitat for key life stages of aquatic species. In many systems, interruption of natural processes via anthropogenic influences have reduced the quantity of secondary channel habitat and have impaired the processes that help form and maintain them. Creation and enhancement of secondary channels is therefore a key component of stream rehabilitation, particularly in the Pacific Northwest where the focus has been on enhancement of habitat for ESA-listed salmonids. Secondary channel enhancement varies widely in scope, scale, and approach depending on species requirements, hydrology/hydraulics, geomorphologic setting, sediment dynamics, and human constraints. This presentation will review case studies from numerous secondary channel projects constructed over the last 20 years by different entities and in different settings. Lessons learned will be discussed that help to understand project performance and inform future project design. A variety of secondary channel project types will be reviewed, including mainstem flow splits, year-round flow through, seasonally activated, backwater alcove, natural groundwater-fed, and engineered groundwater-fed (i.e. groundwater collection galleries). Projects will be discussed that span a range of project construction intensities, such as full excavation of side channels, select excavation to increase flow, or utilizing mainstem structures to activate channels. Different configurations for connecting to the main channel, and their relative performance, will also be presented. A variety of connection types will be discussed including stabilized channel entrance, free-formed entrance, using bar apex jams to split flows, using `bleeder' jams to limit secondary channel flow, and obstructing the main channel to divert flows into secondary channels. The performance and longevity of projects will be discussed, particularly with respect to the response to sediment mobilizing events. Lessons learned from design, construction, and monitoring will be synthesized to share what worked and what didn't, and what key elements a practitioner should think about as part of enhancement project design.
Biomass power for rural development. Technical progress report, May 1, 1996--December 31, 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Developing commercial energy crops for power generation by the year 2000 is the focus of the DOE/USDA sponsored Biomass Power for Rural Development project. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Facette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG). Phase-II of the project willmore » focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. There will be testing of the energy crop as part of the gasification trials expected to occur at BED`s McNeill power station and potentially at one of GPU`s facilities. Phase-III will represent full-scale commercialization of the energy crop and power generation on a sustainable basis. Willow has been selected as the energy crop of choice for many reasons. Willow is well suited to the climate of the Northeastern United States, and initial field trials have demonstrated that the yields required for the success of the project are obtainable. Like other energy crops, willow has rural development benefits and could serve to diversify local crop production, provide new sources of income for participating growers, and create new jobs. Willow could be used to put a large base of idle acreage back into crop production. Additionally, the willow coppicing system integrates well with current farm operations and utilizes agricultural practices that are already familiar to farmers.« less
NASA Astrophysics Data System (ADS)
Jokisch, A.; Urban, W.
2012-04-01
Water is the main limiting factor for economic and agricultural development in central-northern Namibia, where approximately 50% of the Namibian population lives on less than 10% of the country's surface area. The climate in the region can be characterized as semi-arid, with distinctive rainy and dry seasons and an average precipitation of 470 mm/a. Central-northern Namibia can furthermore be characterized by a system of so-called Oshanas, very shallow ephemeral river streams which drain the whole region from north to south towards the Etosha-Saltpan. Water quality within these ephemeral river streams rapidly decreases towards the end of the dry season due to high rates of evaporation (2,700 mm/a) which makes the water unsuitable for human consumption and in certain times of the year also for irrigation purposes. Other local water resources are scarce or of low quality. Therefore, the local water supply is mainly secured via a pipeline scheme which is fed by the Namibian-Angolan border river Kunene. Within the research project CuveWaters - Integrated Water Resources Management in central-northern Namibia different small scale water supply and sanitation technologies are implemented and tested as part of the projects multi-resource mix. The aim is to decentralize the regional water supply and make it more sustainable especially in the face of climate change. To gain understanding and to create ownership within the local population for the technologies implemented, stakeholder participation and capacity development are integral parts of the project. As part of the implementation process of rainwater harvesting and water harvesting from ephemeral river streams, pilot plants for the storage of water were constructed with the help of local stakeholders who will also be the beneficiaries of the pilot plants. The pilot plants consist of covered storage tanks and infrastructure for small scale horticultural use of the water stored. These small scale horticultural activities enable the users of the pilot plants to improve their standard of living by producing vegetables for self-consumption or for selling them on local markets. Irrigation for small-scale horticulture was virtually unknown in the region prior to the project which makes intense training for the local users necessary. This paper summarizes the participative process of finding a pilot village and a suitable location along the ephemeral river stream as well as the process of selecting people from the local community for construction and for the operation of the pilot plant. According to the demand-responsive approach of the CuveWaters project, local stakeholders were involved in all these processes. Tools for participation used are workshops and interviews with local stakeholders and the integration of the users in all decision-making processes as well as in construction, maintenance, operation and monitoring.
ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burpo, Rob
2012-02-29
To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viabilitymore » of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.« less
Integrated fringe projection 3D scanning system for large-scale metrology based on laser tracker
NASA Astrophysics Data System (ADS)
Du, Hui; Chen, Xiaobo; Zhou, Dan; Guo, Gen; Xi, Juntong
2017-10-01
Large scale components exist widely in advance manufacturing industry,3D profilometry plays a pivotal role for the quality control. This paper proposes a flexible, robust large-scale 3D scanning system by integrating a robot with a binocular structured light scanner and a laser tracker. The measurement principle and system construction of the integrated system are introduced. And a mathematical model is established for the global data fusion. Subsequently, a flexible and robust method and mechanism is introduced for the establishment of the end coordination system. Based on this method, a virtual robot noumenon is constructed for hand-eye calibration. And then the transformation matrix between end coordination system and world coordination system is solved. Validation experiment is implemented for verifying the proposed algorithms. Firstly, hand-eye transformation matrix is solved. Then a car body rear is measured for 16 times for the global data fusion algorithm verification. And the 3D shape of the rear is reconstructed successfully.
ERIC Educational Resources Information Center
Hanson, Janet
2017-01-01
This study explored the relationship between school level and the psychosocial construct of an academic mindset operationalized on the Likert-style Project for "Educational Research That Scales" (PERTS) instrument; widely used in testing academic mindset interventions at the classroom level. Analyses were conducted using existing school…
2014-10-01
maneuver • Traditional “ Brick and Mortar ” training models – Difficult to train regularly due to logistics/budget restrictions – Doesn’t scale...complexity, scenario, location , and resources available • Scalable 4-cell planning construct – Exercise Control (White Cell) – Threat Emulation (Red...business impact) • Collaborative effort Trusted Agents ( SMEs ) – Threats – Cyber defense capabilities – Policies and procedures – Project and/or
Fabrication of the HIAD Large-Scale Demonstration Assembly and Upcoming Mission Applications
NASA Technical Reports Server (NTRS)
Swanson, G. T.; Johnson, R. K.; Hughes, S. J.; Dinonno, J. M.; Cheatwood, F M.
2017-01-01
Over a decade of work has been conducted in the development of NASAs Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This effort has included multiple ground test campaigns and flight tests culminating in the HIAD projects second generation (Gen-2) deployable aeroshell system and associated analytical tools. NASAs HIAD project team has developed, fabricated, and tested inflatable structures (IS) integrated with flexible thermal protection system (F-TPS), ranging in diameters from 3-6m, with cone angles of 60 and 70 deg.In 2015, United Launch Alliance (ULA) announced that they will use a HIAD (10-12m) as part of their Sensible, Modular, Autonomous Return Technology (SMART) for their upcoming Vulcan rocket. ULA expects SMART reusability, coupled with other advancements for Vulcan, will substantially reduce the cost of access to space. The first booster engine recovery via HIAD is scheduled for 2024. To meet this near-term need, as well as future NASA applications, the HIAD team is investigating taking the technology to the 10-15m diameter scale.In the last year, many significant development and fabrication efforts have been accomplished, culminating in the construction of a large-scale inflatable structure demonstration assembly. This assembly incorporated the first three tori for a 12m Mars Human-Scale Pathfinder HIAD conceptual design that was constructed with the current state of the art material set. Numerous design trades and torus fabrication demonstrations preceded this effort. In 2016, three large-scale tori (0.61m cross-section) and six subscale tori (0.25m cross-section) were manufactured to demonstrate fabrication techniques using the newest candidate material sets. These tori were tested to evaluate durability and load capacity. This work led to the selection of the inflatable structures third generation (Gen-3) structural liner. In late 2016, the three tori required for the large-scale demonstration assembly were fabricated, and then integrated in early 2017. The design includes provisions to add the remaining four tori necessary to complete the assembly of the 12m Human-Scale Pathfinder HIAD in the event future project funding becomes available.This presentation will discuss the HIAD large-scale demonstration assembly design and fabrication per-formed in the last year including the precursor tori development and the partial-stack fabrication. Potential near-term and future 10-15m HIAD applications will also be discussed.
Fabrication of the HIAD Large-Scale Demonstration Assembly
NASA Technical Reports Server (NTRS)
Swanson, G. T.; Johnson, R. K.; Hughes, S. J.; DiNonno, J. M.; Cheatwood, F. M.
2017-01-01
Over a decade of work has been conducted in the development of NASA's Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This effort has included multiple ground test campaigns and flight tests culminating in the HIAD projects second generation (Gen-2) deployable aeroshell system and associated analytical tools. NASAs HIAD project team has developed, fabricated, and tested inflatable structures (IS) integrated with flexible thermal protection system (F-TPS), ranging in diameters from 3-6m, with cone angles of 60 and 70 deg.In 2015, United Launch Alliance (ULA) announced that they will use a HIAD (10-12m) as part of their Sensible, Modular, Autonomous Return Technology (SMART) for their upcoming Vulcan rocket. ULA expects SMART reusability, coupled with other advancements for Vulcan, will substantially reduce the cost of access to space. The first booster engine recovery via HIAD is scheduled for 2024. To meet this near-term need, as well as future NASA applications, the HIAD team is investigating taking the technology to the 10-15m diameter scale. In the last year, many significant development and fabrication efforts have been accomplished, culminating in the construction of a large-scale inflatable structure demonstration assembly. This assembly incorporated the first three tori for a 12m Mars Human-Scale Pathfinder HIAD conceptual design that was constructed with the current state of the art material set. Numerous design trades and torus fabrication demonstrations preceded this effort. In 2016, three large-scale tori (0.61m cross-section) and six subscale tori (0.25m cross-section) were manufactured to demonstrate fabrication techniques using the newest candidate material sets. These tori were tested to evaluate durability and load capacity. This work led to the selection of the inflatable structures third generation (Gen-3) structural liner. In late 2016, the three tori required for the large-scale demonstration assembly were fabricated, and then integrated in early 2017. The design includes provisions to add the remaining four tori necessary to complete the assembly of the 12m Human-Scale Pathfinder HIAD in the event future project funding becomes available.This presentation will discuss the HIAD large-scale demonstration assembly design and fabrication per-formed in the last year including the precursor tori development and the partial-stack fabrication. Potential near-term and future 10-15m HIAD applications will also be discussed.
Small-Scale Smart Grid Construction and Analysis
NASA Astrophysics Data System (ADS)
Surface, Nicholas James
The smart grid (SG) is a commonly used catch-phrase in the energy industry yet there is no universally accepted definition. The objectives and most useful concepts have been investigated extensively in economic, environmental and engineering research by applying statistical knowledge and established theories to develop simulations without constructing physical models. In this study, a small-scale version (SSSG) is constructed to physically represent these ideas so they can be evaluated. Results of construction show data acquisition three times more expensive than the grid itself although mainly due to the incapability to downsize 70% of data acquisition costs to small-scale. Experimentation on the fully assembled grid exposes the limitations of low cost modified sine wave power, significant enough to recommend pure sine wave investment in future SSSG iterations. Findings can be projected to full-size SG at a ratio of 1:10, based on the appliance representing average US household peak daily load. However this exposes disproportionalities in the SSSG compared with previous SG investigations and recommended changes for future iterations are established to remedy this issue. Also discussed are other ideas investigated in the literature and their suitability for SSSG incorporation. It is highly recommended to develop a user-friendly bidirectional charger to more accurately represent vehicle-to-grid (V2G) infrastructure. Smart homes, BEV swap stations and pumped hydroelectric storage can also be researched on future iterations of the SSSG.
Design and development of hybrid energy generator (photovoltaics) with solar tracker
NASA Astrophysics Data System (ADS)
Mohiuddin, A. K. M.; Sabarudin, Mohamad Syabil Bin; Khan, Ahsan Ali; Izan Ihsan, Sany
2017-03-01
This paper is the outcome of a small scale hybrid energy generator (hydro and photovoltaic) project. It contains the photovoltaics part of the project. The demand of energy resources is increasing day by day. That is why people nowadays tend to move on and changes their energy usage from using fossil fuels to a cleaner and green energy like hydro energy, solar energy etc. Nevertheless, energy is hard to come by for people who live in remote areas and also campsites in the remote areas which need continuous energy sources to power the facilities. Thus, the purpose of this project is to design and develop a small scale hybrid energy generator to help people that are in need of power. This main objective of this project is to develop and analyze the effectiveness of solar trackers in order to increase the electricity generation from solar energy. Software like Solidworks and Arduino is used to sketch and construct the design and also to program the microcontroller respectively. Experimental results show the effectiveness of the designed solar tracker sytem.
In Brief: Carbon storage initiatives at energy department
NASA Astrophysics Data System (ADS)
Showstack, Randy
2009-06-01
The U.S. Department of Energy (DOE) recently announced several initiatives related to carbon capture. On 12 June, DOE secretary Steven Chu announced an agreement with the FutureGen Alliance that advances construction of the country's first commercial-scale, fully integrated carbon capture and sequestration project in Mattoon, Ill. After estimating costs and doing other assessments, DOE and the alliance will decide in 2010 whether to move forward or discontinue the project. “Developing this technology is critically important for reducing greenhouse gas emissions in the U.S. and around the world,” said Chu. The total anticipated financial contribution for the project is $1.1 billion from DOE and $400-600 million from the alliance.
Theoretical framework of the causes of construction time and cost overruns
NASA Astrophysics Data System (ADS)
Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.
2017-11-01
Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.
42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
Extreme-Scale Bayesian Inference for Uncertainty Quantification of Complex Simulations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biros, George
Uncertainty quantification (UQ)—that is, quantifying uncertainties in complex mathematical models and their large-scale computational implementations—is widely viewed as one of the outstanding challenges facing the field of CS&E over the coming decade. The EUREKA project set to address the most difficult class of UQ problems: those for which both the underlying PDE model as well as the uncertain parameters are of extreme scale. In the project we worked on these extreme-scale challenges in the following four areas: 1. Scalable parallel algorithms for sampling and characterizing the posterior distribution that exploit the structure of the underlying PDEs and parameter-to-observable map. Thesemore » include structure-exploiting versions of the randomized maximum likelihood method, which aims to overcome the intractability of employing conventional MCMC methods for solving extreme-scale Bayesian inversion problems by appealing to and adapting ideas from large-scale PDE-constrained optimization, which have been very successful at exploring high-dimensional spaces. 2. Scalable parallel algorithms for construction of prior and likelihood functions based on learning methods and non-parametric density estimation. Constructing problem-specific priors remains a critical challenge in Bayesian inference, and more so in high dimensions. Another challenge is construction of likelihood functions that capture unmodeled couplings between observations and parameters. We will create parallel algorithms for non-parametric density estimation using high dimensional N-body methods and combine them with supervised learning techniques for the construction of priors and likelihood functions. 3. Bayesian inadequacy models, which augment physics models with stochastic models that represent their imperfections. The success of the Bayesian inference framework depends on the ability to represent the uncertainty due to imperfections of the mathematical model of the phenomena of interest. This is a central challenge in UQ, especially for large-scale models. We propose to develop the mathematical tools to address these challenges in the context of extreme-scale problems. 4. Parallel scalable algorithms for Bayesian optimal experimental design (OED). Bayesian inversion yields quantified uncertainties in the model parameters, which can be propagated forward through the model to yield uncertainty in outputs of interest. This opens the way for designing new experiments to reduce the uncertainties in the model parameters and model predictions. Such experimental design problems have been intractable for large-scale problems using conventional methods; we will create OED algorithms that exploit the structure of the PDE model and the parameter-to-output map to overcome these challenges. Parallel algorithms for these four problems were created, analyzed, prototyped, implemented, tuned, and scaled up for leading-edge supercomputers, including UT-Austin’s own 10 petaflops Stampede system, ANL’s Mira system, and ORNL’s Titan system. While our focus is on fundamental mathematical/computational methods and algorithms, we will assess our methods on model problems derived from several DOE mission applications, including multiscale mechanics and ice sheet dynamics.« less
Coal cleaning: An underutilized solution?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Godfrey, R.L.
1995-12-31
Custom Coals Corporation is based in Pittsburgh, Pennsylvania. It is involved in the construction and operation of advanced coal cleaning facilities. The company has initially chosen to focus on Pennsylvania`s vast reserves of coal, because these coal provide a superior feedstock for the Technology. In a $76 million project co-sponsored by the U.S. Department of Energy, Custom Coals is constructing its first coal cleaning facility. The DOE chose to participate with the company in the project pursuant to a competition it sponsored under Round IV of Its Clean Cod Technology program. Thirty-one companies submitted 33 projects seeking approximately $2.3 billionmore » of funding against the $600 million available. The company`s project was one of nine proposals accepted and was the only pre-combustion cleaning technology awarded. The project includes both the construction of a 500 ton per hour coal cleaning facility utilizing the company`s proprietary technologies and a series of power plant test bums on a variety of U.S. coals during a 12-month demonstration program. Three U.S. coal seams - Sewickley, Lower Freeport and Illinois No. 5 - will supply the initial feedstock for the demonstration project. These seams represent a broad range of raw cod qualifies. The processed coals will then be distributed to a number of generating stations for combustion. The 300 megawatt Martins Creek Plant of Pennsylvania Power & Light Co., near Allentown, Pennsylvania, will burn Carefree Coal, the 60 megawatt Whitewater Valley Power Station of Richmond Power and Light (in Indiana) and the Ashtabula, Ohio unit of Centerior Energy will burn Self-Scrubbing Coal. Following these demonstrations, the plant will begin full-scale commercial operation, providing two million tons of Pennsylvania compliance coals to electric power utilities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Black, J.B.; Woods, M.C.; Friedrich, J.J.
1997-12-31
The NOXSO Clean Coal Project will consist of designing, constructing, and operating a commercial-scale flue-gas cleanup system utilizing the NOXSO Process. The process is a waste-free, dry, post-combustion flue-gas treatment technology which uses a regenerable sorbent to simultaneously adsorb sulfur dioxide (SO{sub 2}) and nitrogen oxides (NO{sub x}) from flue gas from coal-fired boilers. The NOXSO plant will be constructed at Alcoa Generating Corporation`s (AGC) Warrick Power Plant near Evansville, Indiana and will treat all the flue gas from the 150-MW Unit 2 boiler. The NOXSO plant is being designed to remove 98% of the SO{sub 2} and 75% ofmore » the NO{sub x} when the boiler is fired with 3.4 weight percent sulfur, southern-Indiana coal. The NOXSO plant by-product will be elemental sulfur. The elemental sulfur will be shipped to Olin Corporation`s Charleston, Tennessee facility for additional processing. As part of the project, a liquid SO{sub 2} plant has been constructed at this facility to convert the sulfur into liquid SO{sub 2}. The project utilizes a unique burn-in-oxygen process in which the elemental sulfur is oxidized to SO{sub 2} in a stream of compressed oxygen. The SO{sub 2} vapor will then be cooled and condensed. The burn-in-oxygen process is simpler and more environmentally friendly than conventional technologies. The liquid SO{sub 2} plant produces 99.99% pure SO{sub 2} for use at Olin`s facilities. The $82.8 million project is co-funded by the US Department of Energy (DOE) under Round III of the Clean Coal Technology program. The DOE manages the project through the Pittsburgh Energy Technology Center (PETC).« less
Plan for CELSS test bed project
NASA Technical Reports Server (NTRS)
Knott, W. M.
1986-01-01
The Closed Ecological Life Support Systems (CELSS) testbed project will achieve two major goals: It will develop the knowledge and technology needed to build and test biological or combined biological physiochemical regenerative life support systems. It will fabricate, test, and operate ground based facilities to accomplish proof-of-concent testing and evaluation leading to flight experimentation. The project will combine basic research and applied research/engineering to achieve a phased, integrated development of hardware, systems, and techniques for food and oxygen production, food processing, and waste processing in closed systems. The project will design, fabricate, and operate within three years a botanical production system scaled to a sufficient size to verify oxygen and nutrient load production (carbohydrates, fats, proteins) at a useable level. It will develop within five years a waste management system compatible with the botanical production system and a food processing system that converts available biomass into edible products. It will design, construct, and operate within ten years a ground based candidate CELSS that includes man as an active participant in the system. It will design a flight CELSS module within twelve years and construct and conduct initial flight tests within fifteen years.
Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less
Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less
[The human variome project and its progress].
Gao, Shan; Zhang, Ning; Zhang, Lei; Duan, Guang-You; Zhang, Tao
2010-11-01
The main goal of post genomics is to explain how the genome, the map of which has been constructed in the Human Genome Project, affacts activities of life. This leads to generate multiple "omics": structural genomics, functional genomics, proteomics, metabonomics, et al. In Jun. 2006, Melbourne, Australia, Human Genome Variation Society (HGVS) initiated the Human Variome Project (HVP) to collect all the sequence variation and polymorphism data worldwidely. HVP is to search and determine those mutations related with human diseases by association study between genetype and phenotype on the scale of genome level and other methods. Those results will be translated into clinical application. Considering the potential effects of this project on human health, this paper introduced its origin and main content in detail and discussed its meaning and prospect.
Baseline process description for simulating plutonium oxide production for precalc project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pike, J. A.
Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO 2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as wellmore » as process and facility design details necessary for multi-scale, multi-physics models are provided.« less
2009-11-19
CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, recipients of a NASA Team Award for their parts in the successful construction of NASA's first large-scale solar power generation facility pose for a group portrait. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Analysis of interstellar fragmentation structure based on IRAS images
NASA Technical Reports Server (NTRS)
Scalo, John M.
1989-01-01
The goal of this project was to develop new tools for the analysis of the structure of densely sampled maps of interstellar star-forming regions. A particular emphasis was on the recognition and characterization of nested hierarchical structure and fractal irregularity, and their relation to the level of star formation activity. The panoramic IRAS images provided data with the required range in spatial scale, greater than a factor of 100, and in column density, greater than a factor of 50. In order to construct a densely sampled column density map of a cloud complex which is both self-gravitating and not (yet?) stirred up much by star formation, a column density image of the Taurus region has been constructed from IRAS data. The primary drawback to using the IRAS data for this purpose is that it contains no velocity information, and the possible importance of projection effects must be kept in mind.
Silicon material task - Low cost solar array project /JPL/DOE/
NASA Technical Reports Server (NTRS)
Lutwack, R.
1979-01-01
The paper describes the silicon material task of the low-cost solar array project, which has the objective of establishing a silicon production capability equivalent to 500 mW per year at a price less than 10 dollars/kg (1975 dollars) in 1986. The task program is divided into four phases: technical feasibility, scale-up studies (the present phase), experimental process system development units, and implementation of large-scale production plants, and it involves the development of processes for two groups of materials, that is, semiconductor grade and solar cell grade. In addition, the effects of impurities on solar cell performance are being investigated. Attention is given to problem areas of the task program, such as environmental protection, material compatibility between the reacting chemicals and materials of construction of the equipment, and waste disposal.
Improving the Kinetics and Thermodynamics of Mg(BH 4) 2 for Hydrogen Storage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, Brandon; Klebanoff, Lennie; Stavila, Vitalie
The objective of this project is to (1) combine theory, synthesis, and characterization across multiple scales to understand the intrinsic kinetic and thermodynamic limitations in MgB 2/Mg(BH 4) 2; (2) construct and apply a flexible, validated, multiscale theoretical framework for modeling (de)hydrogenation kinetics of the Mg-B-H system and related metal hydrides; and (3) devise strategies for improving kinetics and thermodynamics, particularly through nanostructuring and doping. The project has an emphasis on understanding and improving rehydrogenation of MgB 2, which has generally been less explored and is key to enabling practical use.
Closed cycle construction: an integrated process for the separation and reuse of C&D waste.
Mulder, Evert; de Jong, Tako P R; Feenstra, Lourens
2007-01-01
In The Netherlands, construction and demolition (C&D) waste is already to a large extent being reused, especially the stony fraction, which is crushed and reused as a road base material. In order to increase the percentage of reuse of the total C&D waste flow to even higher levels, a new concept has been developed. In this concept, called 'Closed Cycle Construction', the processed materials are being reused at a higher quality level and the quantity of waste that has to be disposed of is minimised. For concrete and masonry, the new concept implies that the material cycle will be completely closed, and the original constituents (clay bricks, gravel, sand, cement stone) are recovered in thermal processes. The mixed C&D waste streams are separated and decontaminated. For this purpose several dry separation techniques are being developed. The quality of the stony fraction is improved so much, that this fraction can be reused as an aggregate in concrete. The new concept has several benefits from a sustainability point of view, namely less energy consumption, less carbon dioxide emission, less waste production and less land use (for excavation and disposal sites). One of the most remarkable benefits of the new concept is that the thermal process steps are fuelled with the combustible fraction of the C&D waste itself. Economically the new process is more or less comparable with the current way of processing C&D waste. On the basis of the positive results of a feasibility study, currently a pilot and demonstration project is being carried out. The aim is to optimise the different process steps of the Closed Cycle Construction process on a laboratory scale, and then to verify them on a large scale. The results of the project are promising, so far.
Buruk, Pelin; Şimşek, Ömer Faruk; Kocayörük, Ercan
2017-01-01
This study attempts to explain the relationship between job satisfaction and the Big Two, Stability and Plasticity, which are the higher-order traits of Big Five. Occupational Project, a narrative construct, was considered a mediator variable in this relationship. Occupational Project consists of affective and cognitive evaluations of an individual's work life as a project in terms of the completed (past), the ongoing (present) and the prospective (future) parts. The survey method was applied to a sample of 253 participants. The results supported the proposed model, in which Occupational Project mediated the relationship between the Big Two and both job satisfaction and affect in workplace. Discussion is focused on applying Occupational Project as a practical tool for management. Consideration of an employee's Occupational Project could provide management with a means to question, understand, intervene with and redefine the narrative quality of his/her occupational project that influences job satisfaction.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
ERIC Educational Resources Information Center
Bridges, Susan; emerald, elke
2013-01-01
In 1998, the government of the Hong Kong Special Administrative Region began a large-scale project to import qualified, experienced native-speaking teachers of English into Hong Kong secondary schools. The Native-speaking English Teacher (NET) scheme later expanded to include Hong Kong primary schools. Currently, teachers from around the world are…
NASA Technical Reports Server (NTRS)
Scheffler, R. L.
1979-01-01
To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.
Scaling up the 454 Titanium Library Construction and Pooling of Barcoded Libraries
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phung, Wilson; Hack, Christopher; Shapiro, Harris
2009-03-23
We have been developing a high throughput 454 library construction process at the Joint Genome Institute to meet the needs of de novo sequencing a large number of microbial and eukaryote genomes, EST, and metagenome projects. We have been focusing efforts in three areas: (1) modifying the current process to allow the construction of 454 standard libraries on a 96-well format; (2) developing a robotic platform to perform the 454 library construction; and (3) designing molecular barcodes to allow pooling and sorting of many different samples. In the development of a high throughput process to scale up the number ofmore » libraries by adapting the process to a 96-well plate format, the key process change involves the replacement of gel electrophoresis for size selection with Solid Phase Reversible Immobilization (SPRI) beads. Although the standard deviation of the insert sizes increases, the overall quality sequence and distribution of the reads in the genome has not changed. The manual process of constructing 454 shotgun libraries on 96-well plates is a time-consuming, labor-intensive, and ergonomically hazardous process; we have been experimenting to program a BioMek robot to perform the library construction. This will not only enable library construction to be completed in a single day, but will also minimize any ergonomic risk. In addition, we have implemented a set of molecular barcodes (AKA Multiple Identifiers or MID) and a pooling process that allows us to sequence many targets simultaneously. Here we will present the testing of pooling a set of selected fosmids derived from the endomycorrhizal fungus Glomus intraradices. By combining the robotic library construction process and the use of molecular barcodes, it is now possible to sequence hundreds of fosmids that represent a minimal tiling path of this genome. Here we present the progress and the challenges of developing these scaled-up processes.« less
Building a Laboratory-Scale Biogas Plant and Verifying its Functionality
NASA Astrophysics Data System (ADS)
Boleman, Tomáš; Fiala, Jozef; Blinová, Lenka; Gerulová, Kristína
2011-01-01
The paper deals with the process of building a laboratory-scale biogas plant and verifying its functionality. The laboratory-scale prototype was constructed in the Department of Safety and Environmental Engineering at the Faculty of Materials Science and Technology in Trnava, of the Slovak University of Technology. The Department has already built a solar laboratory to promote and utilise solar energy, and designed SETUR hydro engine. The laboratory is the next step in the Department's activities in the field of renewable energy sources and biomass. The Department is also involved in the European Union project, where the goal is to upgrade all existed renewable energy sources used in the Department.
42 CFR 137.362 - May construction project agreements be amended?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...
Status and Plans for the FLARE (Facility for Laboratory Reconnection Experiments) Project
NASA Astrophysics Data System (ADS)
Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, S.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.; Chen, Y.; Cutler, R.; Fox, W.; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.
2015-11-01
The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton to study magnetic reconnection in regimes directly relevant to space, solar, astrophysical, and fusion plasmas. The existing small-scale experiments have been focusing on the single X-line reconnection process either with small effective sizes or at low Lundquist numbers, but both of which are typically very large in natural and fusion plasmas. The design of the FLARE device is motivated to provide experimental access to the new regimes involving multiple X-lines, as guided by a reconnection ``phase diagram'' [Ji & Daughton, PoP (2011)]. Most of major components of the FLARE device have been designed and are under construction. The device will be assembled and installed in 2016, followed by commissioning and operation in 2017. The planned research on FLARE as a user facility will be discussed. Supported by NSF.
Construction of a 40-mile long roadside scale model of the solar system in northern Maine
NASA Astrophysics Data System (ADS)
McCartney, K.
2001-05-01
The Maine Solar System Model is currently under construction along Route 1 between Houlton and Presque Isle, in Aroostook County, northern Maine. The scale is 1:93,000,000, or 1 mile equals an astronomical unit. There is a 40 mile distance between the Sun (diameter 49.5 feet) and Pluto (diameter 1 inch). The model will include the Sun, nine planets and seven moons, with diameters and distances all to the same scale. Except for the Sun, all components will be three-dimensional and built to withstand the northern Maine climate. Construction is generally of steel with fiberglass globes positioned on steel posts at least ten feet above ground and 55 feet off the roadway. Road safety concerns require that the Jupiter and Saturn sites include parking lots. Educational information associated with the model will be provided on brochures, since textual information at the sites would require excessive stops and parking problems. Learning exercises will also be provided by travelling trunks prepared by Maine teachers to support the State of Maine Learning Results. This is a community project with the various components being built by ten area schools and with active assistance from many community members and organizations. It is being built with with very little money, with most materials and labor donated.
Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Devenney, Martin; Gilliam, Ryan; Seeker, Randy
2013-08-01
The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptablemore » for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.« less
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
NASA Astrophysics Data System (ADS)
Rana, Arun; Moradkhani, Hamid
2016-07-01
Uncertainties in climate modelling are well documented in literature. Global Climate Models (GCMs) are often used to downscale the climatic parameters on a regional scale. In the present work, we have analyzed the changes in precipitation and temperature for future scenario period of 2070-2099 with respect to historical period of 1970-2000 from statistically downscaled GCM projections in Columbia River Basin (CRB). Analysis is performed using two different statistically downscaled climate projections (with ten GCMs downscaled products each, for RCP 4.5 and RCP 8.5, from CMIP5 dataset) namely, those from the Bias Correction and Spatial Downscaling (BCSD) technique generated at Portland State University and from the Multivariate Adaptive Constructed Analogs (MACA) technique, generated at University of Idaho, totaling to 40 different scenarios. The two datasets for BCSD and MACA are downscaled from observed data for both scenarios projections i.e. RCP4.5 and RCP8.5. Analysis is performed using spatial change (yearly scale), temporal change (monthly scale), percentile change (seasonal scale), quantile change (yearly scale), and wavelet analysis (yearly scale) in the future period from the historical period, respectively, at a scale of 1/16th of degree for entire CRB region. Results have indicated in varied degree of spatial change pattern for the entire Columbia River Basin, especially western part of the basin. At temporal scales, winter precipitation has higher variability than summer and vice versa for temperature. Most of the models have indicated considerate positive change in quantiles and percentiles for both precipitation and temperature. Wavelet analysis provided insights into possible explanation to changes in precipitation.
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...
Beyond scenario planning: projecting the future using models at Wind Cave National Park (USA)
NASA Astrophysics Data System (ADS)
King, D. A.; Bachelet, D. M.; Symstad, A. J.
2011-12-01
Scenario planning has been used by the National Park Service as a tool for natural resource management planning in the face of climate change. Sets of plausible but divergent future scenarios are constructed from available information and expert opinion and serve as starting point to derive climate-smart management strategies. However, qualitative hypotheses about how systems would react to a particular set of conditions assumed from coarse scale climate projections may lack the scientific rigor expected from a federal agency. In an effort to better assess the range of likely futures at Wind Cave National Park, a project was conceived to 1) generate high resolution historic and future climate time series to identify local weather patterns that may or may not persist, 2) simulate the hydrological cycle in this geologically varied landscape and its response to future climate, 3) project vegetation dynamics and ensuing changes in the biogeochemical cycles given grazing and fire disturbances under new climate conditions, and 4) synthesize and compare results with those from the scenario planning exercise. In this framework, we tested a dynamic global vegetation model against local information on vegetation cover, disturbance history and stream flow to better understand the potential resilience of these ecosystems to climate change. We discuss the tradeoffs between a coarse scale application of the model showing regional trends with limited ability to project the fine scale mosaic of vegetation at Wind Cave, and a finer scale approach that can account for local slope effects on water balance and better assess the vulnerability of landscape facets, but requires more intensive data acquisition. We elaborate on the potential for sharing information between models to mitigate the often-limited treatment of biological feedbacks in the physical representations of soil and atmospheric processes.
ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis
2001-07-25
This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less
Construction Cost Growth for New Department of Energy Nuclear Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kubic, Jr., William L.
Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less
Peak finding using biorthogonal wavelets
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tan, C.Y.
2000-02-01
The authors show in this paper how they can find the peaks in the input data if the underlying signal is a sum of Lorentzians. In order to project the data into a space of Lorentzian like functions, they show explicitly the construction of scaling functions which look like Lorentzians. From this construction, they can calculate the biorthogonal filter coefficients for both the analysis and synthesis functions. They then compare their biorthogonal wavelets to the FBI (Federal Bureau of Investigations) wavelets when used for peak finding in noisy data. They will show that in this instance, their filters perform muchmore » better than the FBI wavelets.« less
Mapping of information and identification of construction waste at project life cycle
NASA Astrophysics Data System (ADS)
Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia
2018-03-01
The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.
Biomass power for rural development. Technical progress report, July 1--September 30, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the third quarter of 1997, much of the Consortium`s effort has focused on outreach activities, continued feedstock development, fuel supply planning, and fuel contract development, and preparation for 1998 scale-up activities. The Consortium also submitted a Phase-1 extension proposal during this period. A few of the more important milestones are outlined below. The fourth quarter of 1997 is expected to be dominated by Phase-II proposal efforts and planning for 1998 activities.« less
NASA Astrophysics Data System (ADS)
Sidles, John A.; Garbini, Joseph L.; Harrell, Lee E.; Hero, Alfred O.; Jacky, Jonathan P.; Malcomb, Joseph R.; Norman, Anthony G.; Williamson, Austin M.
2009-06-01
Practical recipes are presented for simulating high-temperature and nonequilibrium quantum spin systems that are continuously measured and controlled. The notion of a spin system is broadly conceived, in order to encompass macroscopic test masses as the limiting case of large-j spins. The simulation technique has three stages: first the deliberate introduction of noise into the simulation, then the conversion of that noise into an equivalent continuous measurement and control process, and finally, projection of the trajectory onto state-space manifolds having reduced dimensionality and possessing a Kähler potential of multilinear algebraic form. These state-spaces can be regarded as ruled algebraic varieties upon which a projective quantum model order reduction (MOR) is performed. The Riemannian sectional curvature of ruled Kählerian varieties is analyzed, and proved to be non-positive upon all sections that contain a rule. These manifolds are shown to contain Slater determinants as a special case and their identity with Grassmannian varieties is demonstrated. The resulting simulation formalism is used to construct a positive P-representation for the thermal density matrix. Single-spin detection by magnetic resonance force microscopy (MRFM) is simulated, and the data statistics are shown to be those of a random telegraph signal with additive white noise. Larger-scale spin-dust models are simulated, having no spatial symmetry and no spatial ordering; the high-fidelity projection of numerically computed quantum trajectories onto low dimensionality Kähler state-space manifolds is demonstrated. The reconstruction of quantum trajectories from sparse random projections is demonstrated, the onset of Donoho-Stodden breakdown at the Candès-Tao sparsity limit is observed, a deterministic construction for sampling matrices is given and methods for quantum state optimization by Dantzig selection are given.
Progress in Decommissioning the Humboldt Bay Power Plant - 13604
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John
Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less
Tree tensor network approach to simulating Shor's algorithm
NASA Astrophysics Data System (ADS)
Dumitrescu, Eugene
2017-12-01
Constructively simulating quantum systems furthers our understanding of qualitative and quantitative features which may be analytically intractable. In this paper, we directly simulate and explore the entanglement structure present in the paradigmatic example for exponential quantum speedups: Shor's algorithm. To perform our simulation, we construct a dynamic tree tensor network which manifestly captures two salient circuit features for modular exponentiation. These are the natural two-register bipartition and the invariance of entanglement with respect to permutations of the top-register qubits. Our construction help identify the entanglement entropy properties, which we summarize by a scaling relation. Further, the tree network is efficiently projected onto a matrix product state from which we efficiently execute the quantum Fourier transform. Future simulation of quantum information states with tensor networks exploiting circuit symmetries is discussed.
Research on cost control and management in high voltage transmission line construction
NASA Astrophysics Data System (ADS)
Xu, Xiaobin
2017-05-01
Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.
Research on the application of BIM technology in the whole life cycle of construction projects
NASA Astrophysics Data System (ADS)
Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE
2018-05-01
BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2010 CFR
2010-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2012 CFR
2012-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2014 CFR
2014-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2011 CFR
2011-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
25 CFR 700.465 - Technical feasibility.
Code of Federal Regulations, 2013 CFR
2013-04-01
... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...
The Grand Ethiopian Renaissance Dam: Source of cooperation or contention?
Teferi Taye, Meron; Tadesse, Tsegaye; Senay, Gabriel; Block, Paul
2016-01-01
This paper discusses the challenges and benefits of the Grand Ethiopian Renaissance Dam (GERD), which is under construction and expected to be operational on the Blue Nile River in Ethiopia in a few years. Like many large-scale projects on transboundary rivers, the GERD has been criticized for potentially jeopardizing downstream water security and livelihoods through upstream unilateral decision making. In spite of the contentious nature of the project, the authors argue that this project can provide substantial benefits for regional development. The GERD, like any major river infrastructure project, will undeniably bring about social, environmental, and economic change, and in this unique case has, on balance, the potential to achieve success on all fronts. It must be stressed, however, that strong partnerships between riparian countries are essential. National success is contingent on regional cooperation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...
Research on Green Construction Technology Applied at Guangzhou Hongding Building Project
NASA Astrophysics Data System (ADS)
Lou, Yong Zhong
2018-06-01
The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.
42 CFR 137.327 - May multiple projects be included in a single construction project agreement?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...
2016-08-01
7 2.1. DYNAMIC DART GUN EXPERIMENTS...penetration, and cavity formation associated with high-speed projectile penetration of sand. A new half-inch gun was constructed for this project. A...inch gun with them. Data was collected utilizing NSWC’s Cordin 550, 64 frame, high-speed camera. In addition, several student participated in the
1991-07-01
were kept lockf-ŕ. The only pprs-rnel a~thtorizod in thos,, areas duiring the 1off-hours 4o- the E(G daho sit-2 ontt~s ENSCO Plaot Siupprintern’nt...items, normally issued by EG&G Idaho INEL personnel, were kept in a separate Action Item Logbook from the EG&G ! daho /subcuntractor action items. The
The communication in industrialised building system (IBS) construction project: Virtual environment
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd
2017-10-01
Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.
NASA Astrophysics Data System (ADS)
Hsu, S. C.; Witherspoon, F. D.; Cassibry, J. T.; Gilmore, M.; Samulyak, R.; Stoltz, P.; the PLX-α Team
2015-11-01
Under ARPA-E's ALPHA program, the Plasma Liner Experiment-ALPHA (PLX- α) project aims to demonstrate the viability and scalability of spherically imploding plasma liners as a standoff, high-implosion-velocity magneto-inertial-fusion (MIF) driver that is potentially compatible with both low- and high- β targets. The project has three major objectives: (a) advancing existing contoured-gap coaxial-gun technology to achieve higher operational reliability/precision and better control/reproducibility of plasma-jet properties and profiles; (2) conducting ~ π / 2 -solid-angle plasma-liner experiments with 9 guns to demonstrate (along with extrapolations from modeling) that the jet-merging process leads to Mach-number degradation and liner uniformity that are acceptable for MIF; and (3) conducting 4 π experiments with up to 60 guns to demonstrate the formation of an imploding spherical plasma liner for the first time, and to provide empirical ram-pressure and uniformity scaling data for benchmarking our codes and informing us whether the scalings justify further development beyond ALPHA. This talk will provide an overview of the PLX- α project as well as key research results to date. Supported by ARPA-E's ALPHA program; original PLX construction supported by DOE Fusion Energy Sciences.
The Challenges Of Investigating And Remediating Port Hope's Small-Scale Urban Properties - 13115
DOE Office of Scientific and Technical Information (OSTI.GOV)
Veen, Walter van; Case, Glenn; Benson, John
2013-07-01
An important component of the Port Hope Project, the larger of the two projects comprising the Port Hope Area Initiative (PHAI), is the investigation of all 4,800 properties in the Municipality of Port Hope for low level radioactive waste (LLRW) and the remediation of approximately 10% of these. Although the majority of the individual properties are not expected to involve technically sophisticated remediation programs, the large number of property owners and individually unique properties are expected to present significant logistic challenges that will require a high degree of planning, organization and communication. The protocol and lessons learned described will bemore » of interest to those considering similar programs. Information presented herein is part of a series of papers presented by the PHAI Management Office (PHAI MO) at WM Symposium '13 describing the history of the Port Hope Project and current project status. Other papers prepared for WM Symposium '13 address the large-scale site cleanup and the construction of the long-term waste management facility (LTWMF) where all of the LLRW will be consolidated and managed within an engineered, above-ground mound. (authors)« less
Highway construction related business impacts : phase 3 effort for the town of Dubois.
DOT National Transportation Integrated Search
2008-03-01
Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
From November 1991 to April 1996, Kerr McGee Coal Corporation (K-M Coal) led a project to develop the Institute of Gas Technology (IGT) Mild Gasification (MILDGAS) process for near-term commercialization. The specific objectives of the program were to: design, construct, and operate a 24-tons/day adiabatic process development unit (PDU) to obtain process performance data suitable for further design scale-up; obtain large batches of coal-derived co-products for industrial evaluation; prepare a detailed design of a demonstration unit; and develop technical and economic plans for commercialization of the MILDGAS process. The project team for the PDU development program consisted of: K-M Coal,more » IGT, Bechtel Corporation, Southern Illinois University at Carbondale (SIUC), General Motors (GM), Pellet Technology Corporation (PTC), LTV Steel, Armco Steel, Reilly Industries, and Auto Research.« less
Relationship between time management in construction industry and project management performance
NASA Astrophysics Data System (ADS)
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
Global Squeeze: Assessing Climate-Critical Resource Constraints for Coastal Climate Adaptation
NASA Astrophysics Data System (ADS)
Chase, N. T.; Becker, A.; Schwegler, B.; Fischer, M.
2014-12-01
The projected impacts of climate change in the coastal zone will require local planning and local resources to adapt to increasing risks of social, environmental, and economic consequences from extreme events. This means that, for the first time in human history, aggregated local demands could outpace global supply of certain "climate-critical resources." For example, construction materials such as sand and gravel, steel, and cement may be needed to fortify many coastal locations at roughly the same point in time if decision makers begin to construct new storm barriers or elevate coastal lands. Where might adaptation bottlenecks occur? Can the world produce enough cement to armour the world's seaports as flood risks increase due to sea-level rise and more intense storms? Just how many coastal engineers would multiple such projects require? Understanding such global implications of adaptation requires global datasets—such as bathymetry, coastal topography, local sea-level rise and storm surge projections, and construction resource production capacity—that are currently unavailable at a resolution appropriate for a global-scale analysis. Our research group has identified numerous gaps in available data necessary to make such estimates on both the supply and demand sides of this equation. This presentation examines the emerging need and current availability of these types of datasets and argues for new coordinated efforts to develop and share such data.
Ribeiro, Jessica D.; Witte, Tracy K.; Van Orden, Kimberly A.; Selby, Edward A.; Gordon, Kathryn H.; Bender, Theodore W.; Joiner, Thomas E.
2014-01-01
The Interpersonal Theory of Suicide proposes that suicidal behavior is so frightening that in order for an individual to engage in suicidal behavior, desire for suicide must be accompanied by the capability to do so. The capability for suicide is characterized by both a sense of fearlessness about death and elevated physiological pain tolerance. The primary aim of the current project was to reevaluate and revise the Acquired Capability for Suicide Scale (ACSS) and offer a revision to the scale. Expert review of the scale items resulted in retaining seven items assessing fearlessness about death. The recommendation is made to refer to the revised scale as the ACSS-Fearlessness about Death (ACSS-FAD) to reflect its content more specifically. A model with the 7 retained items provided good fit to the data across three independent samples of young adults. Multiple group analyses examining measurement invariance across men and women found that the latent structure of the scale is comparable across gender. Data are also presented demonstrating convergent and discriminant validity for the scale in young adults and an inpatient psychiatric sample. Findings support the viability of the ACSS-FAD, indicating the scale has a replicable factor structure that generalizes across males and females and is substantively related to the construct of fearlessness about death. Taken together, the present work extends our knowledge of the psychometrics of the ACSS-FAD in particular and the nature of fearlessness about death in general. PMID:24274043
ERIC Educational Resources Information Center
Agron, Joe
1998-01-01
Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-11
... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
7 CFR 1726.403 - Project construction contract closeout.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...
Final Report: Self-Consolidating Concrete Construction for Modular Units
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gentry, Russell; Kahn, Lawrence; Kurtis, Kimberly
This report focuses on work completed on DE-NE0000667, Self-Consolidating Concrete for Modular Units, in connection with the Department of Energy Nuclear Energy Enabling Technologies (DOE-NEET) program. This project was completed in the School of Civil and Environmental Engineering at the Georgia Institute of Technology, with Westinghouse Corporation as the industrial partner. The primary objective of this project was to develop self-consolidating concrete (also termed “self-compacting concrete” or SCC) mixtures so that concrete placement can be made into steel plate composite (SC) modular structures without the need for continuous concrete placement. As part of the research, SCC mixtures were developed andmore » validated to ensure sufficient shear capacity across cold-joints, while minimizing shrinkage and temperature increase during curing to enhance concrete bonding with the steel plate construction found in modular units. The SCC mixtures developed were able to carry shearing forces across the cold-joint boundaries. This “self-roughening” was achieved by adding a tailored fraction of lightweight aggregate (LWA) to the concrete mix, some of which raised to the surface during curing, forming a rough surface on which subsequent concrete placements were made. The self-roughening behavior was validated through three sets of structural tests. Shear friction on small-scale specimens with cold joints was assessed using varying fractions of LWA and with varying amounts of external steel plate reinforcement. The results show that the shear friction coefficient, to be used with the provisions of ACI 318-14, Section 22.9, can be taken as 1.35. Mid-scale beam tests were completed to assess the cold-joint capacity in both in-plane and out-of-plane bending. The results showed that the self-roughened joints performed as well as monolithic joints. The final assessment was a full-scale test using a steel composite module supplied by Westinghouse and similar in construction to the steel composite modules being assembled at the Vogtle and V.C. Summer plant expansions. The final test showed that the roughened cold-joint showed excellent shear and flexural capacity, and substantial ductility, when used in conjunction with steel composite construction.« less
Efficient coarse simulation of a growing avascular tumor
Kavousanakis, Michail E.; Liu, Ping; Boudouvis, Andreas G.; Lowengrub, John; Kevrekidis, Ioannis G.
2013-01-01
The subject of this work is the development and implementation of algorithms which accelerate the simulation of early stage tumor growth models. Among the different computational approaches used for the simulation of tumor progression, discrete stochastic models (e.g., cellular automata) have been widely used to describe processes occurring at the cell and subcell scales (e.g., cell-cell interactions and signaling processes). To describe macroscopic characteristics (e.g., morphology) of growing tumors, large numbers of interacting cells must be simulated. However, the high computational demands of stochastic models make the simulation of large-scale systems impractical. Alternatively, continuum models, which can describe behavior at the tumor scale, often rely on phenomenological assumptions in place of rigorous upscaling of microscopic models. This limits their predictive power. In this work, we circumvent the derivation of closed macroscopic equations for the growing cancer cell populations; instead, we construct, based on the so-called “equation-free” framework, a computational superstructure, which wraps around the individual-based cell-level simulator and accelerates the computations required for the study of the long-time behavior of systems involving many interacting cells. The microscopic model, e.g., a cellular automaton, which simulates the evolution of cancer cell populations, is executed for relatively short time intervals, at the end of which coarse-scale information is obtained. These coarse variables evolve on slower time scales than each individual cell in the population, enabling the application of forward projection schemes, which extrapolate their values at later times. This technique is referred to as coarse projective integration. Increasing the ratio of projection times to microscopic simulator execution times enhances the computational savings. Crucial accuracy issues arising for growing tumors with radial symmetry are addressed by applying the coarse projective integration scheme in a cotraveling (cogrowing) frame. As a proof of principle, we demonstrate that the application of this scheme yields highly accurate solutions, while preserving the computational savings of coarse projective integration. PMID:22587128
Improvement of the cost-benefit analysis algorithm for high-rise construction projects
NASA Astrophysics Data System (ADS)
Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir
2018-03-01
The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.
The Quest CCS Project - MMV Technology Deployment Through Two Years of Operation
NASA Astrophysics Data System (ADS)
O'Brien, S.
2017-12-01
In September 2012, Shell, on behalf of the Athabasca Oil Sands Project venture (Shell Canada Energy, Chevron Canada Limited, Marathon Oil Canada Corporation), announced that it was proceeding to construct the Quest Carbon Capture and Storage (CCS) project near Fort Saskatchewan. Quest is the world's first large-scale commercial application of CCS at an oil sands operation, and it is now capturing more than one million tonnes of CO2 per year from the Scotford Upgrader. It is a fully integrated project, involving CO2 capture at the bitumen upgrader, transportation along a 65 km pipeline, and CO2 storage in a deep saline aquifer (the Basal Cambrian Sands). Construction was completed in August 2015, and the Quest project was certified for commercial operation in September 2015. The Measurement, Monitoring and Verification (MMV) program for Quest is comprehensive, with a variety of technologies being used to monitor the atmosphere, hydrosphere, biosphere and geosphere. These include a Lightsource system for atmospheric monitoring, extensive groundwater sampling, DAS VSPs to assess the development of the CO2 plume, a microseismic array to measure any induced seismic activity, and temperature and pressure gauges for reservoir monitoring. Over two years of operations, this program has been optimized to address key risks while improving operational efficiency. Quest has now successfully captured and stored more than 2 million tonnes of CO2 with no MMV indications of any storage issues.
25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...
ERIC Educational Resources Information Center
Wang, Heng
2017-01-01
Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…
13 CFR 308.1 - Use of funds in Projects constructed under projected cost.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...
Bronx Zoo cogeneration project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rivet, P.H.
The New York Zoological Society commenced feasibility studies for a proposed cogeneration and district heating system for the Bronz Zoo in spring 1982. Early studies focused on evaluating the Zoo's energy loads, infrastructure, and energy delivery and financing systems. The Zoological Society and New York City joined in the decision to support the construction of a system which would serve not only the Bronx Zoo but also five nearby City-funded installations, including the adjacent New York Botanical Garden. Since the submission of that study, the project has been modified in scope, scaling back to a generating capacity designed to servemore » only the Bronz Zoo.« less
Application of BIM technology in construction bidding
NASA Astrophysics Data System (ADS)
wei, Li
2017-12-01
bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.
[Rating scales based on the phenomenological and structural approach].
Schiltz, L
2006-01-01
A current tendency of research in clinical psychology consists in using an integrated quantitative and qualitative methodology. This approach is especially suited to the study of the therapeutic intervention where the researcher is himself part of the situation he is investigating. As to the tools of research, the combination of the semi-structured clinical interview, of psychometric scales and projective tests has proved to be pertinent to describe the multidimensional and fluctuating reality of the therapeutic relationship and the changes induced by it in the two partners. In arts therapeutic research the investigation of the artistic production or of the free expression of people may complete the psychometric and projective tools. The concept of "expressive test" is currently being used to characterise this method. In this context, the development of rating scales, based on the phenomenological and structural or holistic approach allows us making the link between qualitative analysis and quantification, leading to the use of inferential statistics, providing that we remain at the nominal or ordinal level of measurement. We are explaining the principle of construction of these rating scales and we are illustrating our practice with some examples drawn from studies we realized in clinical psychology.
NASA Astrophysics Data System (ADS)
Mochizuki, M.; Kanazawa, T.; Uehira, K.; Shimbo, T.; Shiomi, K.; Kunugi, T.; Aoi, S.; Matsumoto, T.; Sekiguchi, S.; Yamamoto, N.; Takahashi, N.; Shinohara, M.; Yamada, T.
2016-12-01
National Research Institute for Earth Science and Disaster Resilience ( NIED ) has launched the project of constructing an observatory network for tsunamis and earthquakes on the seafloor. The observatory network was named "S-net, Seafloor Observation Network for Earthquakes and Tsunamis along the Japan Trench". The S-net consists of 150 seafloor observatories which are connected in line with submarine optical cables. The total length of submarine optical cable is about 5,700 km. The S-net system extends along Kuril and Japan trenches around Japan islands from north to south covering the area between southeast off island of Hokkaido and off the Boso Peninsula, Chiba Prefecture. The project has been financially supported by MEXT Japan. An observatory package is 34cm in diameter and 226cm long. Each observatory equips two units of a high sensitive water-depth sensor as a tsunami meter and four sets of three-component seismometers. The water-depth sensor has measurement resolution of sub-centimeter level. Combination of multiple seismometers secures wide dynamic range and robustness of the observation that are needed for early earthquake warning. The S-net is composed of six segment networks that consists of about 25 observatories and 800-1,600km length submarine optical cable. Five of six segment networks except the one covering the outer rise area of the Japan Trench has been already installed. The data from the observatories on those five segment networks are being transferred to the data center at NIED on a real-time basis, and then verification of data integrity are being carried out at the present moment. Installation of the last segment network of the S-net, that is, the outer rise one is scheduled to be finished within FY2016. Full-scale operation of the S-net will start at FY2017. We will report construction and operation of the S-net submarine cable system as well as the outline of the obtained data in this presentation.
The Australian Computational Earth Systems Simulator
NASA Astrophysics Data System (ADS)
Mora, P.; Muhlhaus, H.; Lister, G.; Dyskin, A.; Place, D.; Appelbe, B.; Nimmervoll, N.; Abramson, D.
2001-12-01
Numerical simulation of the physics and dynamics of the entire earth system offers an outstanding opportunity for advancing earth system science and technology but represents a major challenge due to the range of scales and physical processes involved, as well as the magnitude of the software engineering effort required. However, new simulation and computer technologies are bringing this objective within reach. Under a special competitive national funding scheme to establish new Major National Research Facilities (MNRF), the Australian government together with a consortium of Universities and research institutions have funded construction of the Australian Computational Earth Systems Simulator (ACcESS). The Simulator or computational virtual earth will provide the research infrastructure to the Australian earth systems science community required for simulations of dynamical earth processes at scales ranging from microscopic to global. It will consist of thematic supercomputer infrastructure and an earth systems simulation software system. The Simulator models and software will be constructed over a five year period by a multi-disciplinary team of computational scientists, mathematicians, earth scientists, civil engineers and software engineers. The construction team will integrate numerical simulation models (3D discrete elements/lattice solid model, particle-in-cell large deformation finite-element method, stress reconstruction models, multi-scale continuum models etc) with geophysical, geological and tectonic models, through advanced software engineering and visualization technologies. When fully constructed, the Simulator aims to provide the software and hardware infrastructure needed to model solid earth phenomena including global scale dynamics and mineralisation processes, crustal scale processes including plate tectonics, mountain building, interacting fault system dynamics, and micro-scale processes that control the geological, physical and dynamic behaviour of earth systems. ACcESS represents a part of Australia's contribution to the APEC Cooperation for Earthquake Simulation (ACES) international initiative. Together with other national earth systems science initiatives including the Japanese Earth Simulator and US General Earthquake Model projects, ACcESS aims to provide a driver for scientific advancement and technological breakthroughs including: quantum leaps in understanding of earth evolution at global, crustal, regional and microscopic scales; new knowledge of the physics of crustal fault systems required to underpin the grand challenge of earthquake prediction; new understanding and predictive capabilities of geological processes such as tectonics and mineralisation.
Brizuela, Leonardo; Richardson, Aaron; Marsischky, Gerald; Labaer, Joshua
2002-01-01
Thanks to the results of the multiple completed and ongoing genome sequencing projects and to the newly available recombination-based cloning techniques, it is now possible to build gene repositories with no precedent in their composition, formatting, and potential. This new type of gene repository is necessary to address the challenges imposed by the post-genomic era, i.e., experimentation on a genome-wide scale. We are building the FLEXGene (Full Length EXpression-ready) repository. This unique resource will contain clones representing the complete ORFeome of different organisms, including Homo sapiens as well as several pathogens and model organisms. It will consist of a comprehensive, characterized (sequence-verified), and arrayed gene repository. This resource will allow full exploitation of the genomic information by enabling genome-wide scale experimentation at the level of functional/phenotypic assays as well as at the level of protein expression, purification, and analysis. Here we describe the rationale and construction of this resource and focus on the data obtained from the Saccharomyces cerevisiae project.
The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects
NASA Astrophysics Data System (ADS)
Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa
2018-03-01
The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.
Empirical research on the influencing factors of the occupational stress for construction workers
NASA Astrophysics Data System (ADS)
LV, Xing; WU, Xiang; CI, Huipeng; LIU, Qing; YAO, Yongzheng
2017-04-01
Employee’s occupational stress and safety performance are highly related, which has been generally recognized by the researchers. We did this research to understand the status of the stress for construction workers, and explore the influence factors of pressure source with characteristics of construction industry. Based on the results of previous studies, we designed questionnaire to collect the influence factors on occupational stressors. The study selected workers from certain construction units at the grass-roots level as sample source. According to the results of the questionnaire, we redesigned the interview outline, and did the semi-structured interviews on workers randomly selected. Finally, we developed a scale which combined the characteristics of construction projects in China. Using SPSS software for factor analysis, reliability analysis, and descriptive statistical analysis, the results show that there are six factors affecting the workers’ occupational stress, including The Work Itself, Family-Work, Career Development, Organization Style, Interpersonal Relationship and Role Management Style. The work itself is the main sources of occupational stress. The results can be used by the construction company to provide guidance for workers to control and manage occupational stress.
Development of measures of organizational leadership for health promotion.
Barrett, Linda; Plotnikoff, Ronald C; Raine, Kim; Anderson, Donna
2005-04-01
This study describes the development and psychometric evaluation of four scales measuring leadership for health promotion at an organizational level in the baseline survey (n=144) of the Alberta Heart Health Project. Content validity was established through a series of focus groups and expert opinion appraisals, pilot testing of a draft based on capacity assessment instruments developed by other provinces involved in the Canadian Heart Health Initiative, and the literature. Psychometric analyses provided empirical evidence of the construct validity and reliability of the organizational leadership scales. Principal component analysis verified the unidimensionality of the leadership scales of (a) Practices for Organizational Learning, (b) Wellness Planning, (c) Workplace Climate, and (d) Organization Member Development. Scale alpha coefficients ranged between .79 and .91 thus establishing good to high scale internal consistencies. These measures can be used by both researchers and practitioners for the assessment of organizational leadership for health promotion and heart health promotion.
Methodology of project management at implementation of projects of high-rise construction
NASA Astrophysics Data System (ADS)
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
NASA Astrophysics Data System (ADS)
Hubbard, S. S.; Williams, K. H.; Agarwal, D.; Banfield, J. F.; Beller, H. R.; Bouskill, N.; Brodie, E.; Maxwell, R. M.; Nico, P. S.; Steefel, C. I.; Steltzer, H.; Tokunaga, T. K.; Wainwright, H. M.; Dwivedi, D.; Newcomer, M. E.
2017-12-01
Recognizing the societal importance, vulnerability and complexity of mountainous watersheds, the `Watershed Function' project is developing a predictive understanding of how mountainous watersheds retain and release downgradient water, nutrients, carbon, and metals. In particular, the project is exploring how early snowmelt, drought, floods and other disturbances will influence mountainous watershed dynamics at seasonal to decadal timescales. Located in the 300km2 East River headwater catchment of the Upper Colorado River Basin, the project is guided by several constructs. First, the project considers the integrated role of surface and subsurface flow and biogeochemical reactions - from bedrock to the top of the vegetative canopy, from terrestrial through aquatic compartments, and from summit to receiving waters. The project takes a system-of-systems perspective, focused on developing new methods to quantify the cumulative watershed hydrobiogeochemical response to perturbations based on information from select subsystems within the watershed, each having distinct vegetation-subsurface biogeochemical-hydrological characteristics. A `scale-adaptive' modeling capability, in development using adaptive mesh refinement methods, serves as the organizing framework for the SFA. The scale-adaptive approach is intended to permit simulation of system-within-systems behavior - and aggregation of that behavior - from genome through watershed scales. This presentation will describe several early project discoveries and advances made using experimental, observational and numerical approaches. Among others, examples may include:quantiying how seasonal hydrological perturbations drive biogeochemical responses across critical zone compartments, with a focus on N and C transformations; metagenomic documentation of the spatial variability in floodplain meander microbial ecology; 3D reactive transport simulations of couped hydrological-biogeochemical behavior in the hyporheic zone; and new characterization and inversion approaches to quantify co-variability between above and below ground dynamics and the susceptibility of vegetation to drought stress. More information is provided at: Watershed.lbl.gov
24 CFR 941.402 - Project design and construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...
Construction project management handbook.
DOT National Transportation Integrated Search
2012-03-01
The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...
Monitoring Environmental Performance Commitments in Construction Projects.
DOT National Transportation Integrated Search
2007-05-01
EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....
Multi objective climate change impact assessment using multi downscaled climate scenarios
NASA Astrophysics Data System (ADS)
Rana, Arun; Moradkhani, Hamid
2016-04-01
Global Climate Models (GCMs) are often used to downscale the climatic parameters on a regional and global scale. In the present study, we have analyzed the changes in precipitation and temperature for future scenario period of 2070-2099 with respect to historical period of 1970-2000 from a set of statistically downscaled GCM projections for Columbia River Basin (CRB). Analysis is performed using 2 different statistically downscaled climate projections namely the Bias Correction and Spatial Downscaling (BCSD) technique generated at Portland State University and the Multivariate Adaptive Constructed Analogs (MACA) technique, generated at University of Idaho, totaling to 40 different scenarios. Analysis is performed on spatial, temporal and frequency based parameters in the future period at a scale of 1/16th of degree for entire CRB region. Results have indicated in varied degree of spatial change pattern for the entire Columbia River Basin, especially western part of the basin. At temporal scales, winter precipitation has higher variability than summer and vice-versa for temperature. Frequency analysis provided insights into possible explanation to changes in precipitation.
Precision probes of QCD at high energies
NASA Astrophysics Data System (ADS)
Alioli, Simone; Farina, Marco; Pappadopulo, Duccio; Ruderman, Joshua T.
2017-07-01
New physics, that is too heavy to be produced directly, can leave measurable imprints on the tails of kinematic distributions at the LHC. We use energetic QCD processes to perform novel measurements of the Standard Model (SM) Effective Field Theory. We show that the dijet invariant mass spectrum, and the inclusive jet transverse momentum spectrum, are sensitive to a dimension 6 operator that modifies the gluon propagator at high energies. The dominant effect is constructive or destructive interference with SM jet production. We compare differential next-to-leading order predictions from POWHEG to public 7 TeV jet data, including scale, PDF, and experimental uncertainties and their respective correlations. We constrain a New Physics (NP) scale of 3.5 TeV with current data. We project the reach of future 13 and 100 TeV measurements, which we estimate to be sensitive to NP scales of 8 and 60 TeV, respectively. As an application, we apply our bounds to constrain heavy vector octet colorons that couple to the QCD current. We project that effective operators will surpass bump hunts, in terms of coloron mass reach, even for sequential couplings.
NASA Astrophysics Data System (ADS)
Krechowicz, Maria
2017-10-01
Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Doran, Glenn; Leong, Lawrence Y.C.
2000-05-01
The project goal is to convert a currently usable by-product of oil production, produced water, into a valuable drinking water resource. The project was located at the Placate Oil Field in Santa Clarita, California, approximately 25 miles north of Los Angeles. The project included a literature review of treatment technologies; preliminary bench-scale studies to refine a planning level cost estimate; and a 10-100 gpm pilot study to develop the conceptual design and cost estimate for a 44,000 bpd treatment facility. A reverse osmosis system was constructed, pilot tested, and the data used to develop a conceptual design and operation ofmore » four operational scenarios, two industrial waters levels and two irrigation/potable water.« less
Scale-adaptive compressive tracking with feature integration
NASA Astrophysics Data System (ADS)
Liu, Wei; Li, Jicheng; Chen, Xiao; Li, Shuxin
2016-05-01
Numerous tracking-by-detection methods have been proposed for robust visual tracking, among which compressive tracking (CT) has obtained some promising results. A scale-adaptive CT method based on multifeature integration is presented to improve the robustness and accuracy of CT. We introduce a keypoint-based model to achieve the accurate scale estimation, which can additionally give a prior location of the target. Furthermore, by the high efficiency of data-independent random projection matrix, multiple features are integrated into an effective appearance model to construct the naïve Bayes classifier. At last, an adaptive update scheme is proposed to update the classifier conservatively. Experiments on various challenging sequences demonstrate substantial improvements by our proposed tracker over CT and other state-of-the-art trackers in terms of dealing with scale variation, abrupt motion, deformation, and illumination changes.
2013-03-01
33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde
Wilderness, natural areas, and ecological reserves: thoughts on the politics of the big outside
R. McGreggor Cawley
2000-01-01
This essay offers some loosely organized comments on the project of preserving wilderness on the scale of the big outside. These comments are arranged around a subject that has been the topic of quite a bit of debate over the past few yearsâthe possibility that the nature in our discussions about federal land and the environment is an artifact of social construction....
In the Service of the National Economy
1960-07-22
research on hydromechanics, particularly as applied to hydroturbines . The construction project for the hydraulic complex in the region of the Sanhsi...Gorge on the Yangtse River, to be initiated next year, will be on a huge scale. The design and manufacture of the huge hydroturbines require the...designed a small hydroturbine to be operated under low pressure (0.3 - 1.0 meters). The laws of the aerodynamics of the propeller were taken into account
Hydropower and sustainability: resilience and vulnerability in China's powersheds.
McNally, Amy; Magee, Darrin; Wolf, Aaron T
2009-07-01
Large dams represent a whole complex of social, economic and ecological processes, perhaps more than any other large infrastructure project. Today, countries with rapidly developing economies are constructing new dams to provide energy and flood control to growing populations in riparian and distant urban communities. If the system is lacking institutional capacity to absorb these physical and institutional changes there is potential for conflict, thereby threatening human security. In this paper, we propose analyzing sustainability (political, socioeconomic, and ecological) in terms of resilience versus vulnerability, framed within the spatial abstraction of a powershed. The powershed framework facilitates multi-scalar and transboundary analysis while remaining focused on the questions of resilience and vulnerability relating to hydropower dams. Focusing on examples from China, this paper describes the complex nature of dams using the sustainability and powershed frameworks. We then analyze the roles of institutions in China to understand the relationships between power, human security and the socio-ecological system. To inform the study of conflicts over dams China is a particularly useful case study because we can examine what happens at the international, national and local scales. The powershed perspective allows us to examine resilience and vulnerability across political boundaries from a dynamic, process-defined analytical scale while remaining focused on a host of questions relating to hydro-development that invoke drivers and impacts on national and sub-national scales. The ability to disaggregate the affects of hydropower dam construction from political boundaries allows for a deeper analysis of resilience and vulnerability. From our analysis we find that reforms in China's hydropower sector since 1996 have been motivated by the need to create stability at the national scale rather than resilient solutions to China's growing demand for energy and water resource control at the local and international scales. Some measures that improved economic development through the market economy and a combination of dam construction and institutional reform may indeed improve hydro-political resilience at a single scale. However, if China does address large-scale hydropower construction's potential to create multi-scale geopolitical tensions, they may be vulnerable to conflict - though not necessarily violent - in domestic and international political arenas. We conclude with a look toward a resilient basin institution for the Nu/Salween River, the site of a proposed large-scale hydropower development effort in China and Myanmar.
41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...
Weston, David J.; Turetsky, Merritt R.; Johnson, Matthew G.; ...
2017-10-27
Considerable progress has been made in ecological and evolutionary genetics with studies demonstrating how genes underlying plant and microbial traits can influence adaptation and even ‘extend’ to influence community structure and ecosystem level processes. The progress in this area is limited to model systems with deep genetic and genomic resources that often have negligible ecological impact or interest. Therefore, important linkages between genetic adaptations and their consequences at organismal and ecological scales are often lacking. We introduce the Sphagnome Project, which incorporates genomics into a long-running history of Sphagnum research that has documented unparalleled contributions to peatland ecology, carbon sequestration,more » biogeochemistry, microbiome research, niche construction, and ecosystem engineering. The Sphagnome Project encompasses a genus-level sequencing effort that represents a new type of model system driven not only by genetic tractability, but by ecologically relevant questions and hypotheses.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weston, David J.; Turetsky, Merritt R.; Johnson, Matthew G.
Considerable progress has been made in ecological and evolutionary genetics with studies demonstrating how genes underlying plant and microbial traits can influence adaptation and even ‘extend’ to influence community structure and ecosystem level processes. The progress in this area is limited to model systems with deep genetic and genomic resources that often have negligible ecological impact or interest. Therefore, important linkages between genetic adaptations and their consequences at organismal and ecological scales are often lacking. We introduce the Sphagnome Project, which incorporates genomics into a long-running history of Sphagnum research that has documented unparalleled contributions to peatland ecology, carbon sequestration,more » biogeochemistry, microbiome research, niche construction, and ecosystem engineering. The Sphagnome Project encompasses a genus-level sequencing effort that represents a new type of model system driven not only by genetic tractability, but by ecologically relevant questions and hypotheses.« less
Weston, David J; Turetsky, Merritt R; Johnson, Matthew G; Granath, Gustaf; Lindo, Zoë; Belyea, Lisa R; Rice, Steven K; Hanson, David T; Engelhardt, Katharina A M; Schmutz, Jeremy; Dorrepaal, Ellen; Euskirchen, Eugénie S; Stenøien, Hans K; Szövényi, Péter; Jackson, Michelle; Piatkowski, Bryan T; Muchero, Wellington; Norby, Richard J; Kostka, Joel E; Glass, Jennifer B; Rydin, Håkan; Limpens, Juul; Tuittila, Eeva-Stiina; Ullrich, Kristian K; Carrell, Alyssa; Benscoter, Brian W; Chen, Jin-Gui; Oke, Tobi A; Nilsson, Mats B; Ranjan, Priya; Jacobson, Daniel; Lilleskov, Erik A; Clymo, R S; Shaw, A Jonathan
2018-01-01
Considerable progress has been made in ecological and evolutionary genetics with studies demonstrating how genes underlying plant and microbial traits can influence adaptation and even 'extend' to influence community structure and ecosystem level processes. Progress in this area is limited to model systems with deep genetic and genomic resources that often have negligible ecological impact or interest. Thus, important linkages between genetic adaptations and their consequences at organismal and ecological scales are often lacking. Here we introduce the Sphagnome Project, which incorporates genomics into a long-running history of Sphagnum research that has documented unparalleled contributions to peatland ecology, carbon sequestration, biogeochemistry, microbiome research, niche construction, and ecosystem engineering. The Sphagnome Project encompasses a genus-level sequencing effort that represents a new type of model system driven not only by genetic tractability, but by ecologically relevant questions and hypotheses. © 2017 UT-Battelle New Phytologist © 2017 New Phytologist Trust.
Overview of the ATLAS Insertable B-Layer (IBL) Project
NASA Astrophysics Data System (ADS)
Kagan, M. A.
2014-06-01
The first upgrade for the Pixel Detector will be a new pixel layer which is currently under construction and will be installed during the first shutdown of the LHC machine, in 2013-14. The new detector, called the Insertable B-layer (IBL), will be installed between the existing Pixel Detector and a new, smaller radius beam-pipe. Two different silicon sensor technologies, planar n-in-n and 3D, will be used, connected with the new generation 130nm IBM CMOS FE-I4 readout chip via solder bump-bonds. A production quality control test bench was set up in the ATLAS inner detector assembly clean room to verify and rate the performance of the detector elements before integration around the beam-pipe. An overview of the IBL project, of the module design, the qualification for these sensor technologies, the integration quality control setups and recent results in the construction of this full scale new concept detector is discussed.
Construction project management handbook : September 2009.
DOT National Transportation Integrated Search
2009-09-01
The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...
Designing Citizen Science Projects in the Era of Mega-Information and Connected Activism
NASA Astrophysics Data System (ADS)
Pompea, S. M.
2010-12-01
The design of citizen science projects must take many factors into account in order to be successful. Currently, there are a wide variety of citizen science projects with different aims, audiences, reporting methods, and degrees of scientific rigor and usefulness. Projects function on local, national, and worldwide scales and range in time from limited campaigns to around the clock projects. For current and future projects, advanced cell phones and mobile computing allow an unprecedented degree of connectivity and data transfer. These advances will greatly influence the design of citizen science projects. An unprecedented amount of data is available for data mining by interested citizen scientists; how can projects take advantage of this? Finally, a variety of citizen scientist projects have social activism and change as part of their mission and goals. How can this be harnessed in a constructive and efficient way? The design of projects must also select the proper role for experts and novices, provide quality control, and must motivate users to encourage long-term involvement. Effective educational and instructional materials design can be used to design responsive and effective projects in a more highly connected age with access to very large amounts of information.
Singh, Amika S; Vik, Froydis N; Chinapaw, Mai J M; Uijtdewilligen, Léonie; Verloigne, Maïté; Fernández-Alvira, Juan M; Stomfai, Sarolta; Manios, Yannis; Martens, Marloes; Brug, Johannes
2011-12-09
Insight in children's energy balance-related behaviours (EBRBs) and their determinants is important to inform obesity prevention research. Therefore, reliable and valid tools to measure these variables in large-scale population research are needed. To examine the test-retest reliability and construct validity of the child questionnaire used in the ENERGY-project, measuring EBRBs and their potential determinants among 10-12 year old children. We collected data among 10-12 year old children (n = 730 in the test-retest reliability study; n = 96 in the construct validity study) in six European countries, i.e. Belgium, Greece, Hungary, the Netherlands, Norway, and Spain. Test-retest reliability was assessed using the intra-class correlation coefficient (ICC) and percentage agreement comparing scores from two measurements, administered one week apart. To assess construct validity, the agreement between questionnaire responses and a subsequent face-to-face interview was assessed using ICC and percentage agreement. Of the 150 questionnaire items, 115 (77%) showed good to excellent test-retest reliability as indicated by ICCs > .60 or percentage agreement ≥ 75%. Test-retest reliability was moderate for 34 items (23%) and poor for one item. Construct validity appeared to be good to excellent for 70 (47%) of the 150 items, as indicated by ICCs > .60 or percentage agreement ≥ 75%. From the other 80 items, construct validity was moderate for 39 (26%) and poor for 41 items (27%). Our results demonstrate that the ENERGY-child questionnaire, assessing EBRBs of the child as well as personal, family, and school-environmental determinants related to these EBRBs, has good test-retest reliability and moderate to good construct validity for the large majority of items.
Singh, Amika S; Chinapaw, Mai J M; Uijtdewilligen, Léonie; Vik, Froydis N; van Lippevelde, Wendy; Fernández-Alvira, Juan M; Stomfai, Sarolta; Manios, Yannis; van der Sluijs, Maria; Terwee, Caroline; Brug, Johannes
2012-08-13
Insight in parental energy balance-related behaviours, their determinants and parenting practices are important to inform childhood obesity prevention. Therefore, reliable and valid tools to measure these variables in large-scale population research are needed. The objective of the current study was to examine the test-retest reliability and construct validity of the parent questionnaire used in the ENERGY-project, assessing parental energy balance-related behaviours, their determinants, and parenting practices among parents of 10-12 year old children. We collected data among parents (n = 316 in the test-retest reliability study; n = 109 in the construct validity study) of 10-12 year-old children in six European countries, i.e. Belgium, Greece, Hungary, the Netherlands, Norway, and Spain. Test-retest reliability was assessed using the intra-class correlation coefficient (ICC) and percentage agreement comparing scores from two measurements, administered one week apart. To assess construct validity, the agreement between questionnaire responses and a subsequent interview was assessed using ICC and percentage agreement.All but one item showed good to excellent test-retest reliability as indicated by ICCs > .60 or percentage agreement ≥ 75%. Construct validity appeared to be good to excellent for 92 out of 121 items, as indicated by ICCs > .60 or percentage agreement ≥ 75%. From the other 29 items, construct validity was moderate for 24 and poor for 5 items. The reliability and construct validity of the items of the ENERGY-parent questionnaire on multiple energy balance-related behaviours, their potential determinants, and parenting practices appears to be good. Based on the results of the validity study, we strongly recommend adapting parts of the ENERGY-parent questionnaire if used in future research.
2011-01-01
Background Insight in children's energy balance-related behaviours (EBRBs) and their determinants is important to inform obesity prevention research. Therefore, reliable and valid tools to measure these variables in large-scale population research are needed. Objective To examine the test-retest reliability and construct validity of the child questionnaire used in the ENERGY-project, measuring EBRBs and their potential determinants among 10-12 year old children. Methods We collected data among 10-12 year old children (n = 730 in the test-retest reliability study; n = 96 in the construct validity study) in six European countries, i.e. Belgium, Greece, Hungary, the Netherlands, Norway, and Spain. Test-retest reliability was assessed using the intra-class correlation coefficient (ICC) and percentage agreement comparing scores from two measurements, administered one week apart. To assess construct validity, the agreement between questionnaire responses and a subsequent face-to-face interview was assessed using ICC and percentage agreement. Results Of the 150 questionnaire items, 115 (77%) showed good to excellent test-retest reliability as indicated by ICCs > .60 or percentage agreement ≥ 75%. Test-retest reliability was moderate for 34 items (23%) and poor for one item. Construct validity appeared to be good to excellent for 70 (47%) of the 150 items, as indicated by ICCs > .60 or percentage agreement ≥ 75%. From the other 80 items, construct validity was moderate for 39 (26%) and poor for 41 items (27%). Conclusions Our results demonstrate that the ENERGY-child questionnaire, assessing EBRBs of the child as well as personal, family, and school-environmental determinants related to these EBRBs, has good test-retest reliability and moderate to good construct validity for the large majority of items. PMID:22152048
Programming in a proposed 9X distributed Ada
NASA Technical Reports Server (NTRS)
Waldrop, Raymond S.; Volz, Richard A.; Goldsack, Stephen J.
1990-01-01
The proposed Ada 9X constructs for distribution was studied. The goal was to select suitable test cases to help in the evaluation of the proposed constructs. The examples were to be considered according to the following requirements: real time operation; fault tolerance at several different levels; demonstration of both distributed and massively parallel operation; reflection of realistic NASA programs; illustration of the issues of configuration, compilation, linking, and loading; indications of the consequences of using the proposed revisions for large scale programs; and coverage of the spectrum of communication patterns such as predictable, bursty, small and large messages. The first month was spent identifying possible examples and judging their suitability for the project.
Equally sloped tomography based X-ray full-field nano-CT at Shanghai Synchrotron Radiation Facility
NASA Astrophysics Data System (ADS)
Wang, Yudan; Ren, Yuqi; Zhou, Guangzhao; Du, Guohao; Xie, Honglan; Deng, Biao; Xiao, Tiqiao
2018-07-01
X-ray full-field nano-computed tomography (nano-CT) has non-destructive three-dimensional imaging capabilities with high spatial resolution, and has been widely applied to investigate morphology and structures in various areas. Conventional tomography reconstructs a 3D object from a large number of equal-angle projections. For nano-CT, it takes long collecting time due to the large projection numbers and long exposure time. Here, equally-sloped tomography (EST) based nano-CT was implemented and constructed on X-ray imaging beamline at the Shanghai Synchrotron Radiation Facility (SSRF) to overcome or alleviate these difficulties. Preliminary results show that hard TXM with the spatial resolution of 100 nm and the EST-based nano-CT with the ability of 3D nano non-destructive characterization have been realized. This technique promotes hard X-ray imaging capability to nano scales at SSRF and could have applications in many fields including nanomaterials, new energy and life sciences. The study will be helpful for the construction of the new full field X-ray nano-imaging beamline with the spatial resolution of 20 nm at SSRF phase II project.
ERIC Educational Resources Information Center
Argon, Joe, Ed.; Spoor, Dana L.; Cox, Susan M.; Brown, Andrew; Ray, Jennifer
1998-01-01
Presents a series of articles that examine decision making in school construction and renovation projects. Topics include preparing for a construction project, purchasing windows that provide protection at a reasonable cost, choosing the best flooring and carpeting, and dealing with deregulation. An industry roundtable discussion on project…
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
14 CFR 151.47 - Performance of construction work: Letting of contracts.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...
Electronic construction collaboration system -- final phase : [tech transfer summary].
DOT National Transportation Integrated Search
2014-07-01
Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...
Enhancements to highway construction scheduling expert system.
DOT National Transportation Integrated Search
2015-05-01
This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...
van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans
2013-01-01
Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.
Measuring leprosy-related stigma - a pilot study to validate a toolkit of instruments.
Rensen, Carin; Bandyopadhyay, Sudhakar; Gopal, Pala K; Van Brakel, Wim H
2011-01-01
Stigma negatively affects the quality of life of leprosy-affected people. Instruments are needed to assess levels of stigma and to monitor and evaluate stigma reduction interventions. We conducted a validation study of such instruments in Tamil Nadu and West Bengal, India. Four instruments were tested in a 'Community Based Rehabilitation' (CBR) setting, the Participation Scale, Internalised Scale of Mental Illness (ISMI) adapted for leprosy-affected persons, Explanatory Model Interview Catalogue (EMIC) for leprosy-affected and non-affected persons and the General Self-Efficacy (GSE) Scale. We evaluated the following components of validity, construct validity, internal consistency, test-retest reproducibility and reliability to distinguish between groups. Construct validity was tested by correlating instrument scores and by triangulating quantitative and qualitative findings. Reliability was evaluated by comparing levels of stigma among people affected by leprosy and community controls, and among affected people living in CBR project areas and those in non-CBR areas. For the Participation, ISMI and EMIC scores significant differences were observed between those affected by leprosy and those not affected (p = 0.0001), and between affected persons in the CBR and Control group (p < 0.05). The internal consistency of the instruments measured with Cronbach's α ranged from 0.83 to 0.96 and was very good for all instruments. Test-retest reproducibility coefficients were 0.80 for the Participation score, 0.70 for the EMIC score, 0.62 for the ISMI score and 0.50 for the GSE score. The construct validity of all instruments was confirmed. The Participation and EMIC Scales met all validity criteria, but test-retest reproducibility of the ISMI and GSE Scales needs further evaluation with a shorter test-retest interval and longer training and additional adaptations for the latter.
Post-disaster housing reconstruction: Perspectives of the NGO and local authorities on delay issues
NASA Astrophysics Data System (ADS)
Khalid, Khairin Norhashidah; Nifa, Faizatul Akmar Abdul; Ismail, Risyawati Mohamed; Lin, Chong Khai
2016-08-01
Post disaster reconstruction is complex, dynamic and chaotic in nature and as such represents many challenges because it is unlike normal construction. However, the time scale of reconstruction is shorter than the normal construction, but it often deals with uncertainties and the scale of the construction activities required is relatively high. After a disaster impacts a country, many governments, institutions and aid organizations cooperate and involved with the reconstruction process. This is seen as a tool for applying policies and programs designed to remedy the weakness in developmental policies, infrastructure and institutional arrangements. This paper reports a part of an on-going research on post-disaster housing reconstruction in Malaysia. An extensive literature review and pilot interviews were undertaken to establish the factors that contribute to the delay in post-disaster reconstruction project. Accordingly, this paper takes the perspective of recovery from non-government organization (NGO) and local authorities which act as providers of social services, builders of infrastructure, regulators of economic activity and managers of the natural environment. As a result, it is important on how those decisions are made, who is involved in the decision-making, and what are the consequences of this decision.
Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project
NASA Astrophysics Data System (ADS)
Bizon-Górecka, Jadwiga; Górecki, Jarosław
2017-10-01
The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.
Leveraging Text Content for Management of Construction Project Documents
ERIC Educational Resources Information Center
Alqady, Mohammed
2012-01-01
The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…
Analysis of renewable energy projects' implementation in Russia
NASA Astrophysics Data System (ADS)
Ratner, S. V.; Nizhegorodtsev, R. M.
2017-06-01
With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.
Using mobile computers to automate the inspection process for highway construction projects.
DOT National Transportation Integrated Search
2013-12-01
Highway construction projects are characterized by the large amount of data that needs to be collected, processed, and exchanged among the : different project participants. Collection of construction inspection data, in particular, allows field perso...
Evaluation of recycled projects for performance : final report.
DOT National Transportation Integrated Search
1995-04-01
Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...
Bonded concrete overlay performance in Illinois
DOT National Transportation Integrated Search
2002-04-01
Two bonded concrete overlay rehabilitation projects were constructed in Illinois during the 1990's. The first project was constructed in 1994 and 1995 on Interstate 80, east of Moline. The second project was constructed in 1996 on Interstate 88 near ...
Multi-model projections of Indian summer monsoon climate changes under A1B scenario
NASA Astrophysics Data System (ADS)
Niu, X.; Wang, S.; Tang, J.
2016-12-01
As part of the Regional Climate Model Intercomparison Project for Asia, the projections of Indian summer monsoon climate changes are constructed using three global climate models (GCMs) and seven regional climate models (RCMs) during 2041-2060 based on the Intergovernmental Panel on Climate Change A1B emission scenario. For the control climate of 1981-2000, most nested RCMs show advantage over the driving GCM of European Centre/Hamburg Fifth Generation (ECHAM5) in the temporal-spatial distributions of temperature and precipitation over Indian Peninsula. Following the driving GCM of ECHAM5, most nested RCMs produce advanced monsoon onset in the control climate. For future climate widespread summer warming is projected over Indian Peninsula by all climate models, with the Multi-RCMs ensemble mean (MME) temperature increasing of 1°C to 2.5°C and the maximum warming center located in northern Indian Peninsula. While for the precipitation, a large inter-model spread is projected by RCMs, with wetter condition in MME projections and significant increase over southern India. Driven by the same GCM, most RCMs project advanced monsoon onset while delayed onset is found in two Regional Climate Model (RegCM3) projections, indicating uncertainty can be expected in the Indian Summer Monsoon onset. All climate models except Conformal-Cubic Atmospheric Model with equal resolution (referred as CCAMP) and two RegCM3 models project stronger summer monsoon during 2041-2060. The disagreement in precipitation projections by RCMs indicates that the surface climate change on regional scale is not only dominated by the large-scale forcing which is provided by driving GCM but also sensitive to RCM' internal physics.
How to measure wisdom: content, reliability, and validity of five measures
Glück, Judith; König, Susanne; Naschenweng, Katja; Redzanowski, Uwe; Dorner, Lara; Straßer, Irene; Wiedermann, Wolfgang
2013-01-01
Wisdom is a field of growing interest both inside and outside academic psychology, and researchers are increasingly interested in using measures of wisdom in their work. However, wisdom is a highly complex construct, and its various operationalizations are based on quite different definitions. Which measure a researcher chooses for a particular research project may have a strong influence on the results. This study compares four well-established measures of wisdom—the Self-Assessed Wisdom Scale (Webster, 2003, 2007), the Three-Dimensional Wisdom Scale (Ardelt, 2003), the Adult Self-Transcendence Inventory (Levenson et al., 2005), and the Berlin Wisdom Paradigm (Baltes and Smith, 1990; Baltes and Staudinger, 2000)—with respect to content, reliability, factorial structure, and construct validity (relationships to wisdom nomination, interview-based wisdom ratings, and correlates of wisdom). The sample consisted of 47 wisdom nominees and 123 control participants. While none of the measures performed “better” than the others by absolute standards, recommendations are given for researchers to select the most suitable measure for their substantive interests. In addition, a “Brief Wisdom Screening Scale” is introduced that contains those 20 items from the three self-report scales that were most highly correlated with the common factor across the scales. PMID:23874310
NASA Astrophysics Data System (ADS)
Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W. S.; Bale, S. D.; Carter, T. A.; Crocker, N.; Drake, J. F.; Egedal, J.; Sarff, J.; Wallace, J.; Belova, E.; Ellis, R.; Fox, W. R., II; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C. E.; Que, W.; Ren, Y.; Titus, P.; Yamada, M.; Yoo, J.
2014-12-01
A new intermediate-scale plasma experiment, called the Facility for Laboratory Reconnection Experiments or FLARE, is under construction at Princeton as a joint project by five universities and two national labs to study magnetic reconnection in regimes directly relevant to space, solar and astrophysical plasmas. The currently existing small-scale experiments have been focusing on the single X-line reconnection process in plasmas either with small effective sizes or at low Lundquist numbers, both of which are typically very large in natural plasmas. These new regimes involve multiple X-lines as guided by a reconnection "phase diagram", in which different coupling mechanisms from the global system scale to the local dissipation scale are classified into different reconnection phases [H. Ji & W. Daughton, Phys. Plasmas 18, 111207 (2011)]. The design of the FLARE device is based on the existing Magnetic Reconnection Experiment (MRX) at Princeton (http://mrx.pppl.gov) and is to provide experimental access to the new phases involving multiple X-lines at large effective sizes and high Lundquist numbers, directly relevant to space and solar plasmas. The motivating major physics questions, the construction status, and the planned collaborative research especially with space and solar research communities will be discussed.
NASA Astrophysics Data System (ADS)
Ji, Hantao; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, Stuart D.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Fox, W.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.
2015-04-01
A new intermediate-scale plasma experiment, called the Facility for Laboratory Reconnection Experiments or FLARE (flare.pppl.gov), is under construction at Princeton as a joint project by five universities and two national labs to study magnetic reconnection in regimes directly relevant to heliophysical and astrophysical plasmas. The currently existing small-scale experiments have been focusing on the single X-line reconnection process in plasmas either with small effective sizes or at low Lundquist numbers, both of which are typically very large in natural plasmas. These new regimes involve multiple X-lines as guided by a reconnection "phase diagram", in which different coupling mechanisms from the global system scale to the local dissipation scale are classified into different reconnection phases [H. Ji & W. Daughton, Phys. Plasmas 18, 111207 (2011)]. The design of the FLARE device is based on the existing Magnetic Reconnection Experiment (MRX) (mrx.pppl.gov) and is to provide experimental access to the new phases involving multiple X-lines at large effective sizes and high Lundquist numbers, directly relevant to magnetospheric, solar wind, and solar coronal plasmas. After a brief summary of recent laboratory results on the topic of magnetic reconnection, the motivating major physics questions, the construction status, and the planned collaborative research especially with heliophysics communities will be discussed.
NASA Astrophysics Data System (ADS)
Venkrbec, Vaclav; Bittnerova, Lucie
2017-12-01
Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.
Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan
NASA Astrophysics Data System (ADS)
Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh
2017-10-01
Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.
Remote sensing of permafrost and geological hazards in Alaska
NASA Technical Reports Server (NTRS)
Ferrians, O. J., Jr. (Principal Investigator)
1973-01-01
The author has identified the following significant results. The study of the ERTS-1 imagery of Alaska indicates the following: that areas of different topographic expression affecting the distribution and character of permafrost can be distinguished clearly; that on the Arctic North Slope, regional differences in the distribution and character of permafrost-related oriented thaw lakes can be observed; that the distribution of certain types of geologic materials having a significant effect on the character of permafrost can be delineated on a regional scale; and that the resolution of the imagery is adequate to identify large scale geologic hazards such as landslides, glacier-dammed lakes, aufeis fields, etc. The information concerning the distribution and character of permafrost and geologic hazards to the gained in accomplishing the objectives of this project will be an invaluable aid in solving engineering-geologic and environmental problems related to route and site selection for structures such as roads, railroads, pipelines, and large installations; to distribution of natural construction materials; and to construction and maintenance.
Stereoscopic applications for design visualization
NASA Astrophysics Data System (ADS)
Gilson, Kevin J.
2007-02-01
Advances in display technology and 3D design visualization applications have made real-time stereoscopic visualization of architectural and engineering projects a reality. Parsons Brinkerhoff (PB) is a transportation consulting firm that has used digital visualization tools from their inception and has helped pioneer the application of those tools to large scale infrastructure projects. PB is one of the first Architecture/Engineering/Construction (AEC) firms to implement a CAVE- an immersive presentation environment that includes stereoscopic rear-projection capability. The firm also employs a portable stereoscopic front-projection system, and shutter-glass systems for smaller groups. PB is using commercial real-time 3D applications in combination with traditional 3D modeling programs to visualize and present large AEC projects to planners, clients and decision makers in stereo. These presentations create more immersive and spatially realistic presentations of the proposed designs. This paper will present the basic display tools and applications, and the 3D modeling techniques PB is using to produce interactive stereoscopic content. The paper will discuss several architectural and engineering design visualizations we have produced.
Efficient Project Delivery Using Lean Principles - An Indian Case Study
NASA Astrophysics Data System (ADS)
Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya
2016-03-01
Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.
Infection control in design and construction work.
Collinge, William H
2015-01-01
To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.
NASA Astrophysics Data System (ADS)
Low, W. W.; Wong, K. S.; Lee, J. L.
2018-04-01
With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.
Code of Federal Regulations, 2014 CFR
2014-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2011 CFR
2011-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2012 CFR
2012-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Code of Federal Regulations, 2013 CFR
2013-10-01
... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...
Risks Associated with Federal Construction Projects
2011-06-01
awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps
[Ecological carrying capacity and Chongming Island's ecological construction].
Wang, Kaiyun; Zou, Chunjing; Kong, Zhenghong; Wang, Tianhou; Chen, Xiaoyong
2005-12-01
This paper overviewed the goals of Chongming Island's ecological construction and its background, analyzed the current eco-economic status and constraints of the Island, and put forward some scientific issues on its ecological construction. It was suggested that for the resources-saving and sustainable development of the Island, the researches on its ecological construction should be based on its ecological carrying capacity, fully take the regional characteristics into consideration, and refer the successful development modes at home and abroad. The carrying capacity study should ground on systemic and dynamic views, give a thorough evaluation of the Island's present carrying capacity, simulate its possible changes, and forecast its demands and risks. Operable countermeasures to promote the Island's carrying capacity should be worked out, new industry structure, population scale, and optimized distribution projects conforming to regional carrying capacity should be formulated, and effective ecological security alarming and control system should be built, with the aim of providing suggestions and strategic evidences for the decision-making of economic development and sustainable environmental resources use of the region.
NASA Astrophysics Data System (ADS)
Vaynshtok, Natalia
2017-10-01
The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.
Marsden, J. Ellen; Binder, Thomas R.; Johnson, James; He, Ji; Dingledine, Natalie; Adams, Janice; Johnson, Nicholas S.; Buchinger, Tyler J.; Krueger, Charles C.
2016-01-01
Degradation of aquatic habitats has motivated construction and research on the use of artificial reefs to enhance production of fish populations. However, reefs are often poorly planned, reef design characteristics are not evaluated, and reef assessments are short-term. We constructed 29 reefs in Thunder Bay, Lake Huron, in 2010 and 2011 to mitigate for degradation of a putative lake trout spawning reef. Reefs were designed to evaluate lake trout preferences for height, orientation, and size, and were compared with two degraded natural reefs and a high-quality natural reef (East Reef). Eggs and fry were sampled on each reef for five years post-construction, and movements of 40 tagged lake trout were tracked during three spawning seasons using acoustic telemetry. Numbers of adults and spawning on the constructed reefs were initially low, but increased significantly over the five years, while remaining consistent on East Reef. Adult density, egg deposition, and fry catch were not related to reef height or orientation of the constructed reefs, but were related to reef size and adjacency to East Reef. Adult lake trout visited and spawned on all except the smallest constructed reefs. Of the metrics used to evaluate the reefs, acoustic telemetry produced the most valuable and consistent data, including fine-scale examination of lake trout movements relative to individual reefs. Telemetry data, supplemented with diver observations, identified several previously unknown natural spawning sites, including the high-use portions of East Reef. Reef construction has increased the capacity for fry production in Thunder Bay without apparently decreasing the use of the natural reef. Results of this project emphasize the importance of multi-year reef assessment, use of multiple assessment methods, and comparison of reef characteristics when developing artificial reef projects. Specific guidelines for construction of reefs focused on enhancing lake trout spawning are suggested.
Development Of Autonomous Systems
NASA Astrophysics Data System (ADS)
Kanade, Takeo
1989-03-01
In the last several years at the Robotics Institute of Carnegie Mellon University, we have been working on two projects for developing autonomous systems: Nablab for Autonomous Land Vehicle and Ambler for Mars Rover. These two systems are for different purposes: the Navlab is a four-wheeled vehicle (van) for road and open terrain navigation, and the Ambler is a six-legged locomotor for Mars exploration. The two projects, however, share many common aspects. Both are large-scale integrated systems for navigation. In addition to the development of individual components (eg., construction and control of the vehicle, vision and perception, and planning), integration of those component technologies into a system by means of an appropriate architecture is a major issue.
Using a fuzzy DEMATEL method for analyzing the factors influencing subcontractors selection
NASA Astrophysics Data System (ADS)
Kozik, Renata
2016-06-01
Subcontracting is a long-standing practice in the construction industry. This form of project organization, if manage properly, could provide the better quality, reduction in project time and costs. Subcontractors selection is a multi-criterion problem and can be determined by many factors. Identifying the importance of each of them as well as the direction of cause-effect relations between various types of factors can improve the management process. Their values could be evaluated on the basis of the available expert opinions with the application of a fuzzy multi-stage grading scale. In this paper it is recommended to use fuzzy DEMATEL method to analyze the relationship between factors affecting subcontractors selection.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...
Synthetic fuels: an industry struggles to be born amidst the perils of techno-econo-politics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heyman, M.
1976-04-01
Despite active planning for a variety of large-scale synthetic fuels projects and some encouraging technical achievements, most proposals have become bogged down, and disheartened supporters are reluctant to proceed further until the economic, environmental, and political atmosphere clears up. The top-level study group urged a variety of federal financial incentives be provided to spur construction and operation of twelve to 15 synthetic fuel first-of-a-kind ''commercial demonstration'' projects. While hopefully contributing a daily 350,000 barrels of oil equivalent by the middle of the next decade, a prime justification for embarking on the commercialization program would be to provide specific environmental, economic,more » and technical information that is currently lacking. The task force specifically pushed for: loan guarantees of up to 75 percent of project cost for high-Btu pipeline gas from coal, loan guarantees for as much as 50 percent of project cost for shale oil, syncrude, and unregulated electric utility or industrial fuels along with price supports; construction grants of up to 50 percent of project costs for regulated utility and industrial fuels; and a maximum of 75 percent in loan guarantees for production of liquids and gases from biomass. Direct combustion of solid wastes for energy recovery was considered inappropriate for inclusion in the program. That particular industry was viewed by the task force as already on its way in response to urban needs. Industry and congressional responses to the incentives are reviewed. (MCW)« less
NASA Astrophysics Data System (ADS)
Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea
2018-03-01
The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project, controlled conditions are created utilising purposefully designed and trialled lesson plans to investigate the process of teacher knowledge construction, with teacher selective attention proposed as a key mediating variable. In order to investigate teacher learning through classroom practice, the project addresses the following questions: To what classroom objects, actions and events do teachers attend and with what consequence for their learning? Do teachers in different countries attend to different classroom events and consequently derive different learning benefits from teaching a lesson? This international project combines focused case studies with an online survey of mathematics teachers' selective attention and consequent learning in Australia, China and Germany. Data include the teacher's adaptation of a pre-designed lesson, the teacher's actions during the lesson, the teacher's reflective thoughts about the lesson and, most importantly, the consequences for the planning and delivery of a second lesson. The combination of fine-grained, culturally situated case studies and large-scale online survey provides mutually informing benefits from each research approach. The research design, so constituted, offers the means to a new and scalable vision of teacher learning and its promotion.
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...
MacNamara, Annmarie; Phan, K Luan
2016-03-01
NIMH's Research Domain Criteria (RDoC) project seeks to advance the diagnosis, prevention, and treatment of mental disorders by promoting psychobiological research on dimensional constructs that might cut across traditional diagnostic boundaries (Kozak & Cuthbert, ). At the core of this approach is the notion that these dimensional constructs can be assessed across different units of analysis (e.g., genes, physiology, behavior), enriching the constructs and providing more complete explanations of clinical problems. While the conceptual aspects of RDoC have been discussed in several prior papers, its methodological aspects have received comparatively less attention. For example, how to integrate data from different units of analysis has been relatively unclear. Here, we discuss one means of psychobiologically operationalizing RDoC constructs across different units of analysis (the psychoneurometric approach; Yancey et al., ), highlighting ways in which this approach might be refined in future iterations. We conclude that there is much to be learned from this technique; however, greater attention to scale-development methods and to psychometrics will likely benefit this and other methodological approaches to combining measurements across multiple units of analysis. © 2016 Society for Psychophysiological Research.
[Regional ecological construction and mission of landscape ecology].
Xiao, Duning; Xie, Fuju; Wei, Jianbing
2004-10-01
The eco-construction on regional and landscape scale is the one which can be used to specific landscape and intercrossing ecosystem in specific region including performing scientific administration of ecosystem and optimizing environmental function. Recently, the government has taken a series of significant projects into action, such as national forest protection item, partly forest restoration, and adjustment of water, etc. Enforcing regional eco-construction and maintaining the ecology security of the nation have become the strategic requisition. In various regions, different eco-construction should be applied, for example, performing ecological safeguard measure in ecological sensitive zone, accommodating the ecological load in ecological fragile zone, etc., which can control the activities of human being, so that, sustainable development can be reached. Facing opportunity and challenge in the development of landscape ecology, we have some key topics: landscape pattern of ecological security, land use and ecological process, landscape changes under human activity stress, quantitative evaluation of the influence on human being activities, evaluation of zonal ecological security and advance warning of ecological risk, and planning and optimizing of model in landscape eco-construction.
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
The Mesaba Energy Project: Clean Coal Power Initiative, Round 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Richard; Gray, Gordon; Evans, Robert
2014-07-31
The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a totalmore » of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-01
The DOE proposes to authorize Washington State University (WSU) to proceed with the detailed design, construction, and equipping of the proposed Center for Advanced Industrial Processes (CAIP). The proposed project would involve construction of a three story building containing laboratories, classrooms, seminar rooms, and graduate student and administrative office space. Existing buildings would be demolished. The proposed facility would house research in thermal/fluid sciences, bioengineering, manufacturing processes, and materials processing. Under the {open_quotes}no-action{close_quotes} DOE would not authorize WSU to proceed with construction under the grant. WSU would then need to consider alternatives for proceeding without DOE funds. Such alternatives (includingmore » delaying or scaling back the project), would result in a postponement or slight reduction in the minor adverse environmental, safety and health Impacts of the project evaluated in this assessment. More importantly, these alternatives would affect the important environmental, safety, health, and programmatic benefits of the projects. The surrounding area is fully urbanized and the campus is intensely developed around the proposed site. The buildings scheduled for demolition do not meet State energy codes, are not air conditioned, and lack handicapped access. Sensitive resources (historical/archeological, protected species/critical habitats, wetlands/floodplains, national forests/parks/trails, prime farmland and special sources of water) would not be affected as they do not occur on or near the proposed site. Cumulative impacts would be small. The proposed action is not related to other actions being considered under other NEPA reviews. There is no conflict between the proposed action and any applicable Federal, State, regional or local land use plans and policies.« less
He, W; Zhao, S; Liu, X; Dong, S; Lv, J; Liu, D; Wang, J; Meng, Z
2013-12-04
Large-scale next-generation sequencing (NGS)-based resequencing detects sequence variations, constructs evolutionary histories, and identifies phenotype-related genotypes. However, NGS-based resequencing studies generate extraordinarily large amounts of data, making computations difficult. Effective use and analysis of these data for NGS-based resequencing studies remains a difficult task for individual researchers. Here, we introduce ReSeqTools, a full-featured toolkit for NGS (Illumina sequencing)-based resequencing analysis, which processes raw data, interprets mapping results, and identifies and annotates sequence variations. ReSeqTools provides abundant scalable functions for routine resequencing analysis in different modules to facilitate customization of the analysis pipeline. ReSeqTools is designed to use compressed data files as input or output to save storage space and facilitates faster and more computationally efficient large-scale resequencing studies in a user-friendly manner. It offers abundant practical functions and generates useful statistics during the analysis pipeline, which significantly simplifies resequencing analysis. Its integrated algorithms and abundant sub-functions provide a solid foundation for special demands in resequencing projects. Users can combine these functions to construct their own pipelines for other purposes.
Effective factor of virtual team: Resolving communication breakdown in IBS construction project
NASA Astrophysics Data System (ADS)
Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.
2016-08-01
Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.
Concepts and applications for influenza antigenic cartography
Cai, Zhipeng; Zhang, Tong; Wan, Xiu-Feng
2011-01-01
Influenza antigenic cartography projects influenza antigens into a two or three dimensional map based on immunological datasets, such as hemagglutination inhibition and microneutralization assays. A robust antigenic cartography can facilitate influenza vaccine strain selection since the antigenic map can simplify data interpretation through intuitive antigenic map. However, antigenic cartography construction is not trivial due to the challenging features embedded in the immunological data, such as data incompleteness, high noises, and low reactors. To overcome these challenges, we developed a computational method, temporal Matrix Completion-Multidimensional Scaling (MC-MDS), by adapting the low rank MC concept from the movie recommendation system in Netflix and the MDS method from geographic cartography construction. The application on H3N2 and 2009 pandemic H1N1 influenza A viruses demonstrates that temporal MC-MDS is effective and efficient in constructing influenza antigenic cartography. The web sever is available at http://sysbio.cvm.msstate.edu/AntigenMap. PMID:21761589
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conroy, Kevin W.; Vandergaast, Gerald
2012-07-01
The Port Granby Project (the Project) is located near the north shore of Lake Ontario in the Municipality of Clarington, Ontario, Canada. The Project consists of relocating approximately 450,000 m{sup 3} of historic Low-Level Radioactive Waste (LLRW) and contaminated soil from the existing Port Granby Waste Management Facility (WMF) to a proposed Long-Term Waste Management Facility (LTWMF) located adjacent to the WMF. The LTWMF will include an engineered waste containment facility, a Wastewater Treatment Plant (WTP), and other ancillary facilities. A series of bench- and pilot-scale test programs have been conducted to identify preferred treatment processes to be incorporated intomore » the WTP to treat wastewater generated during the construction, closure and post-closure periods at the WMF/LTWMF. (authors)« less
Biomass power for rural development. Technical progress report, October 1--December 31, 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Neuhauser, E.
The focus of the DOE/USDA sponsored biomass power for rural development project is to develop commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firing tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC).more » Phase-2 of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is underway. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill Power Station. Phase-3 will represent fullscale commercialization of the energy crop and power generation on a sustainable basis. During the fourth quarter of 1997 the Consortium submitted a Phase-2 proposal. A few of the other more important milestones are outlined below. The first quarter of 1998 will be dominated by pre-planting activity in the spring.« less
Corporate good citizenship pays off in Central America.
1974-07-22
Fear of expropriation and increasing public scrutiny of the activities of multinational companies are forcing these companies to develop social programs in the countries where they operate. Frequently these programs are viewed as products of colonialism or as veiled attempts to dominate the nationals employed by these companies. The United Brands Company, which is involved in large scale banana production in several Central American countries, has adopted a program which seeks to reduce the paternalism which was associated with the operations of the United Fruit Company, the predecessor of the United Brands Company. A series of new programs emphasizing community self help projects were developed by a company-hired sociologist and initiated 4 years ago. In Panama, the projects were started by holding town meetings in which the citizens decided what projects to pursue. With company help the community has begun to build recreational and educational facilities and are also building new docks. The company is contributing $10 million annually to promote these projects. Other programs involve selling homes to workers for half the cost of constructing these homes and increasing efforts to put host country citizens into management positions. Home ownership is expected to stabilize the work force and increased opportunities for advancement are expected to increase productivity. Future plans include the construction of technical schools which will provide a pool of skilled technicians needed by the banana company.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Construction Management--Exploding Some Myths.
ERIC Educational Resources Information Center
Kluenker, Charles
1986-01-01
Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Westendorf, Tiffany; Buddle, Stanlee; Caraher, Joel
The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO 2-capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO 2-capture absorbent for post-combustion capture of CO 2 from coal-fired power plants. The U.S. Department of Energy’s goal for Transformational Carbon Capture Technologies is the development of technologies available for demonstration by 2025 that can capture 90% of emitted CO 2 with at least 95% CO 2 purity for less than $40/tonne of CO 2 captured. In the first budget period of the project,more » the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-e project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO 2 capture performance. In the second budget period of the project, individual bench-scale unit operations were tested to determine the performance of each of each unit. Solids production was demonstrated in dry simulated flue gas across a wide range of absorber operating conditions, with single stage CO 2 conversion rates up to 75mol%. Desorber operation was demonstrated in batch mode, resulting in desorption performance consistent with the equilibrium isotherms for GAP-0/CO 2 reaction. Important risks associated with gas humidity impact on solids consistency and desorber temperature impact on thermal degradation were explored, and adjustments to the bench-scale process were made to address those effects. Corrosion experiments were conducted to support selection of suitable materials of construction for the major unit operations in the process. The bench scale unit operations were assembled into a continuous system to support steady state system testing. In the third budget period of the project, continuous system testing was conducted, including closed-loop operation of the absorber and desober systems. Slurries of GAP-0/GAP-0 carbamate/water mixtures produced in the absorber were pumped successfully to the desorber unit, and regenerated solvent was returned to the absorber. A techno-economic analysis, EH&S risk assessment, and solvent manufacturability study were completed.« less
[Privacy and public benefit in using large scale health databases].
Yamamoto, Ryuichi
2014-01-01
In Japan, large scale heath databases were constructed in a few years, such as National Claim insurance and health checkup database (NDB) and Japanese Sentinel project. But there are some legal issues for making adequate balance between privacy and public benefit by using such databases. NDB is carried based on the act for elderly person's health care but in this act, nothing is mentioned for using this database for general public benefit. Therefore researchers who use this database are forced to pay much concern about anonymization and information security that may disturb the research work itself. Japanese Sentinel project is a national project to detecting drug adverse reaction using large scale distributed clinical databases of large hospitals. Although patients give the future consent for general such purpose for public good, it is still under discussion using insufficiently anonymized data. Generally speaking, researchers of study for public benefit will not infringe patient's privacy, but vague and complex requirements of legislation about personal data protection may disturb the researches. Medical science does not progress without using clinical information, therefore the adequate legislation that is simple and clear for both researchers and patients is strongly required. In Japan, the specific act for balancing privacy and public benefit is now under discussion. The author recommended the researchers including the field of pharmacology should pay attention to, participate in the discussion of, and make suggestion to such act or regulations.
The Three Gorges Dam Affects Regional Precipitation
NASA Technical Reports Server (NTRS)
Wu, Liguang; Zhang, Qiang; Jiang, Zhihong
2006-01-01
Issues regarding building large-scale dams as a solution to power generation and flood control problems have been widely discussed by both natural and social scientists from various disciplines, as well as the policy-makers and public. Since the Chinese government officially approved the Three Gorges Dam (TGD) projects, this largest hydroelectric project in the world has drawn a lot of debates ranging from its social and economic to climatic impacts. The TGD has been partially in use since June 2003. The impact of the TGD is examined through analysis of the National Aeronautics and Space Administration (NASA) Tropical Rainfall Measuring Mission (TRMM) rainfall rate and Moderate Resolution Imaging Spectroradiometer (MODIS) land surface temperature and high-resolution simulation using the Pennsylvania State University-National Center for Atmospheric Research (PSU-NCAR) fifth-generation Mesoscale Model (MM5). The independent satellite data sets and numerical simulation clearly indicate that the land use change associated with the TGD construction has increased the precipitation in the region between Daba and Qinling mountains and reduced the precipitation in the vicinity of the TGD after the TGD water level abruptly rose from 66 to 135 m in June 2003. This study suggests that the climatic effect of the TGD is on the regional scale (approx.100 km) rather than on the local scale (approx.10 km) as projected in previous studies.
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
23 CFR 140.607 - Construction.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...
Statistical wave climate projections for coastal impact assessments
NASA Astrophysics Data System (ADS)
Camus, P.; Losada, I. J.; Izaguirre, C.; Espejo, A.; Menéndez, M.; Pérez, J.
2017-09-01
Global multimodel wave climate projections are obtained at 1.0° × 1.0° scale from 30 Coupled Model Intercomparison Project Phase 5 (CMIP5) global circulation model (GCM) realizations. A semi-supervised weather-typing approach based on a characterization of the ocean wave generation areas and the historical wave information from the recent GOW2 database are used to train the statistical model. This framework is also applied to obtain high resolution projections of coastal wave climate and coastal impacts as port operability and coastal flooding. Regional projections are estimated using the collection of weather types at spacing of 1.0°. This assumption is feasible because the predictor is defined based on the wave generation area and the classification is guided by the local wave climate. The assessment of future changes in coastal impacts is based on direct downscaling of indicators defined by empirical formulations (total water level for coastal flooding and number of hours per year with overtopping for port operability). Global multimodel projections of the significant wave height and peak period are consistent with changes obtained in previous studies. Statistical confidence of expected changes is obtained due to the large number of GCMs to construct the ensemble. The proposed methodology is proved to be flexible to project wave climate at different spatial scales. Regional changes of additional variables as wave direction or other statistics can be estimated from the future empirical distribution with extreme values restricted to high percentiles (i.e., 95th, 99th percentiles). The statistical framework can also be applied to evaluate regional coastal impacts integrating changes in storminess and sea level rise.
NASA Astrophysics Data System (ADS)
Beliakov, Sergei
2018-03-01
Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.
Financial auditing at enterprises for control of projects realized with credit fund-raising
NASA Astrophysics Data System (ADS)
Lukmanova, Inessa
2017-10-01
The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.
18 CFR 4.96 - Amendment of exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...
Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study
NASA Astrophysics Data System (ADS)
Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan
2010-05-01
Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.
Extra-terrestrial construction processes - Advancements, opportunities and challenges
NASA Astrophysics Data System (ADS)
Lim, Sungwoo; Prabhu, Vibha Levin; Anand, Mahesh; Taylor, Lawrence A.
2017-10-01
Government space agencies, including NASA and ESA, are conducting preliminary studies on building alternative space-habitat systems for deep-space exploration. Such studies include development of advanced technologies for planetary surface exploration, including an in-depth understanding of the use of local resources. Currently, NASA plans to land humans on Mars in the 2030s. Similarly, other space agencies from Europe (ESA), Canada (CSA), Russia (Roscosmos), India (ISRO), Japan (JAXA) and China (CNSA) have already initiated or announced their plans for launching a series of lunar missions over the next decade, ranging from orbiters, landers and rovers for extended stays on the lunar surface. As the Space Odyssey is one of humanity's oldest dreams, there has been a series of research works for establishing temporary or permanent settlement on other planetary bodies, including the Moon and Mars. This paper reviews current projects developing extra-terrestrial construction, broadly categorised as: (i) ISRU-based construction materials; (ii) fabrication methods; and (iii) construction processes. It also discusses four categories of challenges to developing an appropriate construction process: (i) lunar simulants; (ii) material fabrication and curing; (iii) microwave-sintering based fabrication; and (iv) fully autonomous and scaled-up construction processes.
CasCADe: A Novel 4D Visualization System for Virtual Construction Planning.
Ivson, Paulo; Nascimento, Daniel; Celes, Waldemar; Barbosa, Simone Dj
2018-01-01
Building Information Modeling (BIM) provides an integrated 3D environment to manage large-scale engineering projects. The Architecture, Engineering and Construction (AEC) industry explores 4D visualizations over these datasets for virtual construction planning. However, existing solutions lack adequate visual mechanisms to inspect the underlying schedule and make inconsistencies readily apparent. The goal of this paper is to apply best practices of information visualization to improve 4D analysis of construction plans. We first present a review of previous work that identifies common use cases and limitations. We then consulted with AEC professionals to specify the main design requirements for such applications. These guided the development of CasCADe, a novel 4D visualization system where task sequencing and spatio-temporal simultaneity are immediately apparent. This unique framework enables the combination of diverse analytical features to create an information-rich analysis environment. We also describe how engineering collaborators used CasCADe to review the real-world construction plans of an Oil & Gas process plant. The system made evident schedule uncertainties, identified work-space conflicts and helped analyze other constructability issues. The results and contributions of this paper suggest new avenues for future research in information visualization for the AEC industry.
The geometry of folds in granitoid rocks of northeastern Alberta
NASA Astrophysics Data System (ADS)
Willem Langenberg, C.; Ramsden, John
1980-06-01
Granitoid rocks which predominate in the Precambrian shield of northeastern Alberta show large-scale fold structures. A numerical procedure has been used to obtain modal foliation orientations. This procedure results in the smoothing of folded surfaces that show roughness on a detailed scale. Statistical tests are used to divide the study areas into cylindrical domains. Structural sections can be obtained for each domain, and horizontal and vertical sections are used to construct block diagrams. The projections are performed numerically and plotted by computer. This method permits blocks to be viewed from every possible angle. Both perspective and orthographic projections can be produced. The geometries of a dome in the Tulip Lake area and a synform in the Hooker Lake area have been obtained. The domal structure is compared with polyphase deformational interference patterns and with experimental diapiric structures obtained in a centrifuge system. The synform in the Hooker Lake area may be genetically related to the doming in the Tulip Lake area.
NASA Astrophysics Data System (ADS)
Rewieński, M.; Lamecki, A.; Mrozowski, M.
2013-09-01
This paper proposes a technique, based on the Inexact Shift-Invert Lanczos (ISIL) method with Inexact Jacobi Orthogonal Component Correction (IJOCC) refinement, and a preconditioned conjugate-gradient (PCG) linear solver with multilevel preconditioner, for finding several eigenvalues for generalized symmetric eigenproblems. Several eigenvalues are found by constructing (with the ISIL process) an extended projection basis. Presented results of numerical experiments confirm the technique can be effectively applied to challenging, large-scale problems characterized by very dense spectra, such as resonant cavities with spatial dimensions which are large with respect to wavelengths of the resonating electromagnetic fields. It is also shown that the proposed scheme based on inexact linear solves delivers superior performance, as compared to methods which rely on exact linear solves, indicating tremendous potential of the 'inexact solve' concept. Finally, the scheme which generates an extended projection basis is found to provide a cost-efficient alternative to classical deflation schemes when several eigenvalues are computed.
Realizing a Rasch measurement through instructionally- sequenced domains of test items.
NASA Astrophysics Data System (ADS)
Schulz, E. Matthew
2016-11-01
This paper presents results from a project in which instructionally-sequenced domains were defined for purposes of constructing measures that that conform to an ideal in Guttman scaling and Rasch measurement. A fundamental idea in these measurement systems is that every person higher on the measurement scale can do everything that lower-level persons can do, plus at least one more thing. This idea has had limited application in educational measurement due to the stochastic nature of item response data and the sheer number of items needed to obtain reliable measures. However, it has been shown by Schulz, Lee, and Mullen [1] that this ideal can be can be realized at a higher level of abstraction - when items within a content strand are aggregated into a small number of domains that are ordered in instructional timing and difficulty. The present paper shows how this was done, and the results, in an achievement level setting project for the 2007 Grade 12 NAEP Economics Assessment.
Macro optical projection tomography for large scale 3D imaging of plant structures and gene activity
Lee, Karen J. I.; Calder, Grant M.; Hindle, Christopher R.; Newman, Jacob L.; Robinson, Simon N.; Avondo, Jerome J. H. Y.
2017-01-01
Abstract Optical projection tomography (OPT) is a well-established method for visualising gene activity in plants and animals. However, a limitation of conventional OPT is that the specimen upper size limit precludes its application to larger structures. To address this problem we constructed a macro version called Macro OPT (M-OPT). We apply M-OPT to 3D live imaging of gene activity in growing whole plants and to visualise structural morphology in large optically cleared plant and insect specimens up to 60 mm tall and 45 mm deep. We also show how M-OPT can be used to image gene expression domains in 3D within fixed tissue and to visualise gene activity in 3D in clones of growing young whole Arabidopsis plants. A further application of M-OPT is to visualise plant-insect interactions. Thus M-OPT provides an effective 3D imaging platform that allows the study of gene activity, internal plant structures and plant-insect interactions at a macroscopic scale. PMID:28025317
NASA Astrophysics Data System (ADS)
Chowdhury, Tamara
2013-08-01
Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.
In it together: Organizational learning through participation in environmental assessment
NASA Astrophysics Data System (ADS)
Fitzpatrick, Patricia
2005-07-01
Can organizations learn through participation in environmental assessment (EA)? This was the central research question of a study that explored the linkages among sustainable development, EA, public participation, and learning. To address this question, the research design involved a comparative case study of two concurrent but geographically separate projects, the Wuskwatim generation station and transmission lines projects (Wuskwatim projects), and the Snap Lake Diamonds Project (Snap Lake project). The Wuskwatim projects involve the construction of a low head dam and three 230 kV transmission line segments in Northern Manitoba, Canada. The Snap Lake Project involves the construction and operation of a diamond mine 220 km northwest of Yellowknife, Northwest Territories, Canada, at the headwaters of the Lockhart River drainage system. The EAs of these proposed developments provided multiple opportunities for public (and organizational) involvement in the review, including comments on the scope of the assessment, information requests, and public hearings. Data collection included participant observation, semi-structured interviews with EA participants, and documentation generated through the course of the reviews. Data were organized using QSR Nvivo, a database software system. In this dissertation, three key contributions are made. The theoretical framework that draws together a number of separate but related fields of study---communicative action, discursive democracy, transformative learning, organizational learning---is the first contribution. The second is verification that organizations learn through participation in EA. Third, empirical support is presented far the assertion that transformative learning can address change beyond that experienced by the individual, to account for both policy-oriented and organizational learning. Related to the second contribution, results indicate that participants of EA engage in Teaming on multiple scales. Furthermore, learning outcomes include both instrumental and communicative learning. Instrumental learning included an increased understanding of technical issues and assessment tools, such as information requests. Communicative teaming outcomes included the importance of dialogue as a means of resolving issues and a refinement of strategies For promoting organizational positions. At an organizational scale, teaming by state actors, including government and tribunals, emphasized mechanisms designed to improve performance within existing structures, or "single-loop learning". Public actors, however, identified more outcomes associated with changes to their theory-in-use, designed to change the structure of the EA process, or "double-loop learning". The discussion of learning supports the application of transformative learning as a framework for considering different scales of learning, the third contribution to research. Findings revealed that individuals and organizations use project specific EA as an opportunity to compel the development and implementation of sustainable initiatives. These findings suggest that higher order learning for sustainability may be occurring through project based EA. Results also revealed the importance of creating opportunities for discussion and debate as a means of engaging organizations in and encouraging learning through EA. These findings support Habermas' emphasis on dialogue as a means of negotiating political systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...
Hu, Wenfa; He, Xinhua
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Governance Tribes carry out construction projects without assuming these Federal environmental... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes carry out construction projects without assuming these Federal environmental responsibilities? 137.291 Section 137.291 Public...
18 CFR 4.104 - Amendment of exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...
Effects of Large-Scale Solar Installations on Dust Mobilization and Air Quality
NASA Astrophysics Data System (ADS)
Pratt, J. T.; Singh, D.; Diffenbaugh, N. S.
2012-12-01
Large-scale solar projects are increasingly being developed worldwide and many of these installations are located in arid, desert regions. To examine the effects of these projects on regional dust mobilization and air quality, we analyze aerosol product data from NASA's Multi-angle Imaging Spectroradiometer (MISR) at annual and seasonal time intervals near fifteen photovoltaic and solar thermal stations ranging from 5-200 MW (12-4,942 acres) in size. The stations are distributed over eight different countries and were chosen based on size, location and installation date; most of the installations are large-scale, took place in desert climates and were installed between 2006 and 2010. We also consider air quality measurements of particulate matter between 2.5 and 10 micrometers (PM10) from the Environmental Protection Agency (EPA) monitoring sites near and downwind from the project installations in the U.S. We use monthly wind data from the NOAA's National Center for Atmospheric Prediction (NCEP) Global Reanalysis to select the stations downwind from the installations, and then perform statistical analysis on the data to identify any significant changes in these quantities. We find that fourteen of the fifteen regions have lower aerosol product after the start of the installations as well as all six PM10 monitoring stations showing lower particulate matter measurements after construction commenced. Results fail to show any statistically significant differences in aerosol optical index or PM10 measurements before and after the large-scale solar installations. However, many of the large installations are very recent, and there is insufficient data to fully understand the long-term effects on air quality. More data and higher resolution analysis is necessary to better understand the relationship between large-scale solar, dust and air quality.
Ranking the Project Management Success Factors for Construction Project in South India
NASA Astrophysics Data System (ADS)
Aneesha, K.; Haridharan, M. K.
2017-07-01
In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.
Morrison, Jean M.; Goldhaber, Martin B.; Holloway, JoAnn M.; Smith, David B.
2008-01-01
In 2004, the U.S. Geological Survey (USGS), the Geological Survey of Canada (GSC), and the Mexican Geological Survey (Servicio Geologico Mexicano, or SGM) initiated pilot studies in preparation for a soil geochemical survey of North America called the Geochemical Landscapes Project. The purpose of this project is to provide a better understanding of the variability in chemical composition of soils in North America. The data produced by this survey will be used to construct baseline geochemical maps for regions within the continent. Two initial pilot studies were conducted: (1) a continental-scale study involving a north-south and east-west transect across North America and (2) a regional-scale study. The pilot studies were intended to test and refine sample design, sampling protocols, and field logistics for the full continental soils geochemical survey. Smith and others (2005) reported the results from the continental-scale pilot study. The regional-scale California study was designed to represent more detailed, higher resolution geochemical investigations in a region of particular interest that was identified from the low-sample-density continental-scale survey. A 20,000-km2 area of northern California (fig. 1), representing a wide variety of topography, climate, and ecoregions, was chosen for the regional-scale pilot study. This study area also contains diverse geology and soil types and supports a wide range of land uses including agriculture in the Sacramento Valley, forested areas in portions of the Sierra Nevada, and urban/suburban centers such as Sacramento, Davis, and Stockton. Also of interest are potential effects on soil geochemistry from historical hard rock and placer gold mining in the foothills of the Sierra Nevada, historical mercury mining in the Coast Range, and mining of base-metal sulfide deposits in the Klamath Mountains to the north. This report presents the major- and trace-element concentrations from the regional-scale soil geochemical survey in northern California.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LESO KF; HAMILTON HM; FARNER M
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less
Process for Low Cost Domestic Production of LIB Cathode Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thurston, Anthony
The objective of the research was to determine the best low cost method for the large scale production of the Nickel-Cobalt-Manganese (NCM) layered cathode materials. The research and development focused on scaling up the licensed technology from Argonne National Laboratory in BASF’s battery material pilot plant in Beachwood Ohio. Since BASF did not have experience with the large scale production of the NCM cathode materials there was a significant amount of development that was needed to support BASF’s already existing research program. During the three year period BASF was able to develop and validate production processes for the NCM 111,more » 523 and 424 materials as well as begin development of the High Energy NCM. BASF also used this time period to provide free cathode material samples to numerous manufactures, OEM’s and research companies in order to validate the ma-terials. The success of the project can be demonstrated by the construction of the production plant in Elyria Ohio and the successful operation of that facility. The benefit of the project to the public will begin to be apparent as soon as material from the production plant is being used in electric vehicles.« less
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
Fung, Ivan W H; Lo, Tommy Y; Tung, Karen C F
2012-09-01
Since the safety professionals are the key decision makers dealing with project safety and risk assessment in the construction industry, their perceptions of safety risk would directly affect the reliability of risk assessment. The safety professionals generally tend to heavily rely on their own past experiences to make subjective decisions on risk assessment without systematic decision making. Indeed, understanding of the underlying principles of risk assessment is significant. In this study, the qualitative analysis on the safety professionals' beliefs of risk assessment and their perceptions towards risk assessment, including their recognitions of possible accident causes, the degree of differentiations on their perceptions of risk levels of different trades of works, recognitions of the occurrence of different types of accidents, and their inter-relationships with safety performance in terms of accident rates will be explored in the Stage 1. At the second stage, the deficiencies of the current general practice for risk assessment can be sorted out firstly. Based on the findings from Stage 1 and the historical accident data from 15 large-scaled construction projects in 3-year average, a risk evaluation model prioritizing the risk levels of different trades of works and which cause different types of site accident due to various accident causes will be developed quantitatively. With the suggested systematic accident recording techniques, this model can be implemented in the construction industry at both project level and organizational level. The model (Q(2)REM) not only act as a useful supplementary guideline of risk assessment for the construction safety professionals, but also assists them to pinpoint the potential risks on site for the construction workers under respective trades of works through safety trainings and education. It, in turn, arouses their awareness on safety risk. As the Q(2)REM can clearly show the potential accident causes leading to different types of accident by trade of works, it helps the concerned safety professionals and parties to plan effective accident prevention measures with reference to the priority of the risk levels. Copyright © 2011 Elsevier Ltd. All rights reserved.
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
Supranowicz, Piotr; Paź, Małgorzata
2014-01-01
A holistic approach to health requires the development of tools that would allow to measure the inner world of individuals within its physical, mental and social dimensions. To create the Physical, Mental and Social Well-being scale (PMSW-21) that allows a holistic representation of various dimensions of well-being in such a way as they are perceived by the individuals and how affected their health. The study was conducted on the sample of 406 inhabitants of Warsaw involving in the Social Participation in Health Reform project. The PMSW-21 scale included: headache, tiredness, abdominal pain, palpitation, joint pain, backache, sleep disturbance (physical domain), anxiety, guiltiness, helplessness, hopelessness, sadness, self-dissatisfaction, hostility (mental domain), security, communicability, protection, loneliness, rejection, sociability and appreciation (social domain). The five criterial variables of health and seven of life experiences were adopted to assess the discriminative power of the PMSW-21 scale. The total well-being scale as well as its physical, mental and social domains showed high reliability (Cronbach a 0.81, 0.77, 0.90, 0.72, respectively). The analysis confirmed the construct validity. All the items stronger correlated with their own domain than with the others (ranges for physical: 0.41 - 0.55, mental: 0.49 - 0.80 and social: 0.31 - 0.50). The total scale demonstrate high sensitivity; it significantly differentiated almost all criterial variables. Physical domain showed high sensitivity for health as well as for negative life events variables, while the mental and social domains were more sensitive for life events. The analysis confirmed the usefulness of PMSW-21 scale for measure the holistic well-being. The reliability of the total scale and its domains, construct validity and sensitivity for health and life determinants were at acceptable level.
26 CFR 1.1039-1 - Certain sales of low-income housing projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...
26 CFR 1.1039-1 - Certain sales of low-income housing projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...
77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...
NASA Astrophysics Data System (ADS)
Arkadov, G. V.; Zhukavin, A. P.; Kroshilin, A. E.; Parshikov, I. A.; Solov'ev, S. L.; Shishov, A. V.
2014-10-01
The article describes the "Virtual Digital VVER-Based Nuclear Power Plant" computerized system comprising a totality of verified initial data (sets of input data for a model intended for describing the behavior of nuclear power plant (NPP) systems in design and emergency modes of their operation) and a unified system of new-generation computation codes intended for carrying out coordinated computation of the variety of physical processes in the reactor core and NPP equipment. Experiments with the demonstration version of the "Virtual Digital VVER-Based NPP" computerized system has shown that it is in principle possible to set up a unified system of computation codes in a common software environment for carrying out interconnected calculations of various physical phenomena at NPPs constructed according to the standard AES-2006 project. With the full-scale version of the "Virtual Digital VVER-Based NPP" computerized system put in operation, the concerned engineering, design, construction, and operating organizations will have access to all necessary information relating to the NPP power unit project throughout its entire lifecycle. The domestically developed commercial-grade software product set to operate as an independently operating application to the project will bring about additional competitive advantages in the modern market of nuclear power technologies.
Use of safety management practices for improving project performance.
Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal
2015-01-01
Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.
Effect of recirculation on organic matter removal in a hybrid constructed wetland system.
Ayaz, S C; Findik, N; Akça, L; Erdoğan, N; Kinaci, C
2011-01-01
This research project aimed to determine the technologically feasible and applicable wastewater treatment systems which will be constructed to solve environmental problems caused by small communities in Turkey. Pilot-scale treatment of a small community's wastewater was performed over a period of more than 2 years in order to show applicability of these systems. The present study involves removal of organic matter and suspended solids in serially operated horizontal (HFCW) and vertical (VFCW) sub-surface flow constructed wetlands. The pilot-scale wetland was constructed downstream of anaerobic reactors at the campus of TUBITAK-MRC. Anaerobically pretreated wastewater was introduced into this hybrid two-stage sub-surface flow wetland system (TSCW). Wastewater was first introduced into the horizontal sub-surface flow system and then the vertical flow system before being discharged. Recirculation of the effluent was tested in the system. When the recirculation ratio was 100%, average removal efficiencies for TSCW were 91 +/- 4% for COD, 83 +/- 10% for BOD and 96 +/- 3% for suspended solids with average effluent concentrations of 9 +/- 5 mg/L COD, 6 +/- 3 mg/L BOD and 1 mg/L for suspended solids. Comparing non-recirculation and recirculation periods, the lowest effluent concentrations were obtained with a 100% recirculation ratio. The effluent concentrations met the Turkish regulations for discharge limits of COD, BOD and TSS in each case. The study showed that a hybrid constructed wetland system with recirculation is a very effective method of obtaining very low effluent organic matter and suspended solids concentrations downstream of anaerobic pretreatment of domestic wastewaters in small communities.
Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating
Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous
Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies
ERIC Educational Resources Information Center
Abbaszadegan, Amin
2016-01-01
Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witwer, K.S.; Dysland, E.J.; Garfield, J.S.
2008-07-01
The GeoMelt{sup R} In-Container Vitrification{sup TM} (ICV{sup TM}) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanford's low-activity waste (LAW). Also referred to as 'bulk vitrification', this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV{sup TM} technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection andmore » administered by CH2M HILL Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV{sup TM} process before operating the Hanford pilot-plant. In 2007, the project's fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV{sup TM} melter with a 10,000- liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test objectives, along with a dozen supporting objectives, were successfully met. Glass performance exceeded all disposal performance criteria. A previous issue with MIS containment was successfully resolved in FS-38D, and the ICV{sup TM} melter was integrated with a full-scale, 10,000-liter dryer. This paper describes the rationale for performing the test, the purpose and outcome of scale-up tests preceding it, and the performance and outcome of FS-38D. (authors)« less
Subramanian, Savitha; Naimoli, Joseph; Matsubayashi, Toru; Peters, David H
2011-12-14
There is widespread agreement on the need for scaling up in the health sector to achieve the Millennium Development Goals (MDGs). But many countries are not on track to reach the MDG targets. The dominant approach used by global health initiatives promotes uniform interventions and targets, assuming that specific technical interventions tested in one country can be replicated across countries to rapidly expand coverage. Yet countries scale up health services and progress against the MDGs at very different rates. Global health initiatives need to take advantage of what has been learned about scaling up. A systematic literature review was conducted to identify conceptual models for scaling up health in developing countries, with the articles assessed according to the practical concerns of how to scale up, including the planning, monitoring and implementation approaches. We identified six conceptual models for scaling up in health based on experience with expanding pilot projects and diffusion of innovations. They place importance on paying attention to enhancing organizational, functional, and political capabilities through experimentation and adaptation of strategies in addition to increasing the coverage and range of health services. These scaling up approaches focus on fostering sustainable institutions and the constructive engagement between end users and the provider and financing organizations. The current approaches to scaling up health services to reach the MDGs are overly simplistic and not working adequately. Rather than relying on blueprint planning and raising funds, an approach characteristic of current global health efforts, experience with alternative models suggests that more promising pathways involve "learning by doing" in ways that engage key stakeholders, uses data to address constraints, and incorporates results from pilot projects. Such approaches should be applied to current strategies to achieve the MDGs.
Constructability issues on KyTC projects.
DOT National Transportation Integrated Search
2003-07-01
A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...
The Development of an Instrument for Measuring Healing
Meza, James Peter; Fahoome, Gail F.
2008-01-01
PURPOSE Our lack of ability to measure healing attributes impairs our ability to research the topic. The specific aim of this project is to describe the psychological and social construct of healing and to create a valid and reliable measurement scale for attributes of healing. METHODS A content expert conducted a domain analysis examining the existing literature of midrange theories of healing. Theme saturation of content sampling was ensured by brainstorming more than 220 potential items. Selection of items was sequential: pile sorting and data reduction, with factor analysis of a mailed 54-item questionnaire. Criterion validity (convergent and divergent) and temporal reliability were established using a second mailing of the development version of the instrument. Construct validity was judged with structural equation modeling for goodness of fit. RESULTS Cronbach’s α of the original questionnaire was .869 and the final scale was .862. The test-retest reliability was .849. Eigenvalues for the 2 factors were 8 and 4, respectively. Divergent and convergent validity using the Spann-Fischer Codependency Scale and SF-36 mental health and emotional subscales were consistent with predictions. The root mean square error of approximation was 0.066 and Bentler’s Comparative Fit Index was 0.871. Root mean square residual was 0.102. CONCLUSIONS We developed a valid and reliable measurement scale for attributes of healing, which we named the Self-Integration Scale v 2.1. By creating a new variable, new areas of research in humanistic health care are possible. PMID:18626036
Keys, Yolanda; Silverman, Susan R; Evans, Jennie
2017-10-01
The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.
SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.
ERIC Educational Resources Information Center
BOICE, JOHN,; AND OTHERS
ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…
Algorithm for evaluating the effectiveness of a high-rise development project based on current yield
NASA Astrophysics Data System (ADS)
Soboleva, Elena
2018-03-01
The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mazzolani, Federico M.
2008-07-08
The seismic protection of historical and monumental buildings, namely dating back from the ancient age up to the 20th Century, is being looked at with greater and greater interest, above all in the Euro-Mediterranean area, its cultural heritage being strongly susceptible to undergo severe damage or even collapse due to earthquake. The cultural importance of historical and monumental constructions limits, in many cases, the possibility to upgrade them from the seismic point of view, due to the fear of using intervention techniques which could have detrimental effects on their cultural value. Consequently, a great interest is growing in the developmentmore » of sustainable methodologies for the use of Reversible Mixed Technologies (RMTs) in the seismic protection of the existing constructions. RMTs, in fact, are conceived for exploiting the peculiarities of innovative materials and special devices, and they allow ease of removal when necessary. This paper deals with the experimental and numerical studies, framed within the EC PROHITECH research project, on the application of RMTs to the historical and monumental constructions mainly belonging to the cultural heritage of the Euro-Mediterranean area. The experimental tests and the numerical analyses are carried out at five different levels, namely full scale models, large scale models, sub-systems, devices, materials and elements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Apfelbaum, Steven L.; Duvall, Kenneth W.; Nelson, Theresa M.
Through the Phase I study segment of contract #DE-NT0006644 with the U.S. Department of Energy’s National Energy Technology Laboratory, Applied Ecological Services, Inc. and Sterling Energy Services, LLC (the AES/SES Team) explored the use of constructed wetlands to help address stresses on surface water and groundwater resources from thermoelectric power plant cooling and makeup water requirements. The project objectives were crafted to explore and develop implementable water conservation and cooling strategies using constructed wetlands (not existing, naturally occurring wetlands), with the goal of determining if this strategy has the potential to reduce surface water and groundwater withdrawals of thermoelectric powermore » plants throughout the country. Our team’s exploratory work has documented what appears to be a significant and practical potential for augmenting power plant cooling water resources for makeup supply at many, but not all, thermoelectric power plant sites. The intent is to help alleviate stress on existing surface water and groundwater resources through harvesting, storing, polishing and beneficially re-using critical water resources. Through literature review, development of conceptual created wetland plans, and STELLA-based modeling, the AES/SES team has developed heat and water balances for conventional thermoelectric power plants to evaluate wetland size requirements, water use, and comparative cooling technology costs. The ecological literature on organism tolerances to heated waters was used to understand the range of ecological outcomes achievable in created wetlands. This study suggests that wetlands and water harvesting can provide a practical and cost-effective strategy to augment cooling waters for thermoelectric power plants in many geographic settings of the United States, particularly east of the 100th meridian, and in coastal and riverine locations. The study concluded that constructed wetlands can have significant positive ancillary socio-economic, ecosystem, and water treatment/polishing benefits when used to complement water resources at thermoelectric power plants. Through the Phase II pilot study segment of the contract, the project team partnered with Progress Energy Florida (now Duke Energy Florida) to quantify the wetland water cooling benefits at their Hines Energy Complex in Bartow, Florida. The project was designed to test the wetland’s ability to cool and cleanse power plant cooling pond water while providing wildlife habitat and water harvesting benefits. Data collected during the monitoring period was used to calibrate a STELLA model developed for the site. It was also used to inform management recommendations for the demonstration site, and to provide guidance on the use of cooling wetlands for other power plants around the country. As a part of the pilot study, Duke Energy is scaling up the demonstration project to a larger, commercial scale wetland instrumented with monitoring equipment. Construction is expected to be finalized in early 2014.« less
The patient satisfaction questionnaire of EUprimecare project: measurement properties.
Cimas, Marta; Ayala, Alba; García-Pérez, Sonia; Sarria-Santamera, Antonio; Forjaz, Maria João
2016-06-01
The measurement of patient satisfaction is considered an essential outcome indicator to evaluate health care quality. Patient satisfaction is considered a multi-dimensional construct, which would include a variety of domains. Although a large number of studies have proposed scales to measure patient satisfaction, there is a lack of psychometric information on them. This study aims to describe the psychometric properties of the Primary Care Satisfaction Scale (PCSS) of the EUprimecare project. A cross-sectional survey of patient satisfaction with primary care was carried out by telephone interview. Primary care services of Estonia, Finland, Germany, Hungary, Lithuania, Italy and Spain. A total of 3020 adult patients aged 18-65 years old attending primary care services. Classic psychometric properties were analysed and Rasch analysis was used to assess the following measurement properties: fit to the Rasch model; uni-dimensionality; reliability; differential item functioning (DIF) by gender, age, civil status, area of residency and country; local independency; adequacy of response scale; and scale targeting. To achieve good fit to the Rasch model, the original response scales of three items (1, 2 and 6) were rescored and Item 3 (waiting time in the room) was removed. The scale was uni-dimensional and Person Separation Index was 0.79, indicating a good reliability. All items were free from bias. PCSS linear measure displayed satisfactory convergent validity with overall satisfaction with primary care. PCSS, as a reliable and valid scale, could be used to measure patient satisfaction in primary care in Europe. © The Author 2016. Published by Oxford University Press in association with the International Society for Quality in Health Care; all rights reserved.
Free Fermions and the Classical Compact Groups
NASA Astrophysics Data System (ADS)
Cunden, Fabio Deelan; Mezzadri, Francesco; O'Connell, Neil
2018-06-01
There is a close connection between the ground state of non-interacting fermions in a box with classical (absorbing, reflecting, and periodic) boundary conditions and the eigenvalue statistics of the classical compact groups. The associated determinantal point processes can be extended in two natural directions: (i) we consider the full family of admissible quantum boundary conditions (i.e., self-adjoint extensions) for the Laplacian on a bounded interval, and the corresponding projection correlation kernels; (ii) we construct the grand canonical extensions at finite temperature of the projection kernels, interpolating from Poisson to random matrix eigenvalue statistics. The scaling limits in the bulk and at the edges are studied in a unified framework, and the question of universality is addressed. Whether the finite temperature determinantal processes correspond to the eigenvalue statistics of some matrix models is, a priori, not obvious. We complete the picture by constructing a finite temperature extension of the Haar measure on the classical compact groups. The eigenvalue statistics of the resulting grand canonical matrix models (of random size) corresponds exactly to the grand canonical measure of free fermions with classical boundary conditions.
Analysis of interstellar cloud structure based on IRAS images
NASA Technical Reports Server (NTRS)
Scalo, John M.
1992-01-01
The goal of this project was to develop new tools for the analysis of the structure of densely sampled maps of interstellar star-forming regions. A particular emphasis was on the recognition and characterization of nested hierarchical structure and fractal irregularity, and their relation to the level of star formation activity. The panoramic IRAS images provided data with the required range in spatial scale, greater than a factor of 100, and in column density, greater than a factor of 50. In order to construct densely sampled column density maps of star-forming clouds, column density images of four nearby cloud complexes were constructed from IRAS data. The regions have various degrees of star formation activity, and most of them have probably not been affected much by the disruptive effects of young massive stars. The largest region, the Scorpius-Ophiuchus cloud complex, covers about 1000 square degrees (it was subdivided into a few smaller regions for analysis). Much of the work during the early part of the project focused on an 80 square degree region in the core of the Taurus complex, a well-studied region of low-mass star formation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richard R. Schultz; Paul D. Bayless; Richard W. Johnson
2010-09-01
The Oregon State University (OSU) High Temperature Test Facility (HTTF) is an integral experimental facility that will be constructed on the OSU campus in Corvallis, Oregon. The HTTF project was initiated, by the U.S. Nuclear Regulatory Commission (NRC), on September 5, 2008 as Task 4 of the 5 year High Temperature Gas Reactor Cooperative Agreement via NRC Contract 04-08-138. Until August, 2010, when a DOE contract was initiated to fund additional capabilities for the HTTF project, all of the funding support for the HTTF was provided by the NRC via their cooperative agreement. The U.S. Department of Energy (DOE) beganmore » their involvement with the HTTF project in late 2009 via the Next Generation Nuclear Plant project. Because the NRC interests in HTTF experiments were only centered on the depressurized conduction cooldown (DCC) scenario, NGNP involvement focused on expanding the experimental envelope of the HTTF to include steady-state operations and also the pressurized conduction cooldown (PCC). Since DOE has incorporated the HTTF as an ingredient in the NGNP thermal-fluids validation program, several important outcomes should be noted: 1. The reference prismatic reactor design, that serves as the basis for scaling the HTTF, became the modular high temperature gas-cooled reactor (MHTGR). The MHTGR has also been chosen as the reference design for all of the other NGNP thermal-fluid experiments. 2. The NGNP validation matrix is being planned using the same scaling strategy that has been implemented to design the HTTF, i.e., the hierarchical two-tiered scaling methodology developed by Zuber in 1991. Using this approach a preliminary validation matrix has been designed that integrates the HTTF experiments with the other experiments planned for the NGNP thermal-fluids verification and validation project. 3. Initial analyses showed that the inherent power capability of the OSU infrastructure, which only allowed a total operational facility power capability of 0.6 MW, is inadequate to permit steady-state operation at reasonable conditions. 4. To enable the HTTF to operate at a more representative steady-state conditions, DOE recently allocated funding via a DOE subcontract to HTTF to permit an OSU infrastructure upgrade such that 2.2 MW will become available for HTTF experiments. 5. Analyses have been performed to study the relationship between HTTF and MHTGR via the hierarchical two-tiered scaling methodology which has been used successfully in the past, e.g., APEX facility scaling to the Westinghouse AP600 plant. These analyses have focused on the relationship between key variables that will be measured in the HTTF to the counterpart variables in the MHTGR with a focus on natural circulation, using nitrogen as a working fluid, and core heat transfer. 6. Both RELAP5-3D and computational fluid dynamics (CD-Adapco’s STAR-CCM+) numerical models of the MHTGR and the HTTF have been constructed and analyses are underway to study the relationship between the reference reactor and the HTTF. The HTTF is presently being designed. It has ¼-scaling relationship to the MHTGR in both the height and the diameter. Decisions have been made to design the reactor cavity cooling system (RCCS) simulation as a boundary condition for the HTTF to ensure that (a) the boundary condition is well defined and (b) the boundary condition can be modified easily to achieve the desired heat transfer sink for HTTF experimental operations.« less
Meals, quarters for 8,200 needed at peak in LNG project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aalund, L.R.
It has everything a real town has except women, children, schools, bars, and old people. It is the huge camp built at Ras Laffan, Qatar, on the shores of the Persian Gulf to lodge and feed over 5,000 workers as they build the first plant in the emirate for liquefying millions of tons of natural gas yearly. Japan`s Chiyoda Corp. is the top contractor for the Qatar Liquefied Gas Co. (QatarGas) project, which is owned by a Qatari, French, American, and Japanese consortium. As part of the plant construction contract, Chiyoda built the camp, which Teyseer Services Co., the Qatarmore » affiliate of the French company, Sodexho Alliance, now runs and maintains. Sodexho is the world`s largest catering/remote site management organization. It has had all its expertise in those fields put to the test for nearly 4 years supporting this world-scale LNG project which will be completed this summer. This project is described.« less
Three Dimensional Measurements And Display Using A Robot Arm
NASA Astrophysics Data System (ADS)
Swift, Thomas E.
1984-02-01
The purpose of this paper is to describe a project which makes three dimensional measurements of an object using a robot arm. A program was written to determine the X-Y-Z coordinates of the end point of a Minimover-5 robot arm which was interfaced to a TRS-80 Model III microcomputer. This program was used in conjunction with computer graphics subroutines that draw a projected three dimensional object.. The robot arm was direc-ted to touch points on an object and then lines were drawn on the screen of the microcomputer between consecutive points as they were entered. A representation of the entire object is in this way constructed on the screen. The three dimensional graphics subroutines have the ability to rotate the projected object about any of the three axes, and to scale the object to any size. This project has applications in the computer-aided design and manufacturing fields because it can accurately measure the features of an irregularly shaped object.
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This Environmental Assessment (EA) evaluates environmental issues associated with constructing and operating an integrated emissions control system proposed by We Energies and its project partners with cost-shared funding support by DOE. The proposed project would be demonstrated at the existing 90-MW Units 7, 8, and 9 of We Energies' coal-fired Presque Isle Power Plant in Marquette, Michigan. The commercial-scale demonstrate would allow utilities to make decisions regarding the integrated emissions control system as a viable commercial option. DOE's share of the funding for the 5-year demonstration project would be about $25 million, while $25 million would also be provided bymore » We Energies and its project partners. This project was selected by DOE under the Clean Coal Power Initiative (CCPI) for negotiation of a cooperative agreement to demonstrate the integration of technologies to reduce emissions of mercury (Hg) and particulate matter, as well as potentially control sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}) and hydrochloric acid (HCl) emissions. DOE's decision is whether or not to fund the project. The EA evaluates the principal environmental issues, including air quality, waste management, and traffic, that could result from construction and operation of the proposed project. The EA also considers two reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. Key findings include that potential air quality impacts resulting from the proposed project would generally be beneficial because plantwide air emissions would decrease or continue at the same level. The decrease in stack exit temperature would decrease the plume rise, which could result in increased downwind ground-level concentrations of those air pollutants experience little or no decrease in stack emissions. However, results of air dispersion modeling indicated that no major impacts would be expected relative to Prevention of Significant Deterioration increments and National Ambient Air Quality Standards.« less
Wang, Yong
2017-03-25
In the last decade, synthetic biology research has been gradually transited from monocellular parts or devices toward more complex multicellular systems. The emerging plant synthetic biology is regarded as the "next chapter" of synthetic biology. The complex and diverse plant metabolism as the entry point, plant synthetic biology research not only helps us understand how real life is working, but also facilitates us to learn how to design and construct more complex artificial life. Bioactive compounds innovation and large-scale production are expected to be breakthrough with the redesigned plant metabolism as well. In this review, we discuss the research progress in plant synthetic biology and propose the new materia medica project to lift the level of traditional Chinese herbal medicine research.
Identifying challenges in project consultants engagement practices
NASA Astrophysics Data System (ADS)
Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul
2017-10-01
Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.
Moores, Carly Jane; Miller, Jacqueline; Perry, Rebecca Anne; Chan, Lily Lai Hang; Daniels, Lynne Allison; Vidgen, Helen Anna; Magarey, Anthea Margaret
2017-11-29
Translation encompasses the continuum from clinical efficacy to widespread adoption within the healthcare service and ultimately routine clinical practice. The Parenting, Eating and Activity for Child Health (PEACH™) program has previously demonstrated clinical effectiveness in the management of child obesity, and has been recently implemented as a large-scale community intervention in Queensland, Australia. This paper aims to describe the translation of the evaluation framework from a randomised controlled trial (RCT) to large-scale community intervention (PEACH™ QLD). Tensions between RCT paradigm and implementation research will be discussed along with lived evaluation challenges, responses to overcome these, and key learnings for future evaluation conducted at scale. The translation of evaluation from PEACH™ RCT to the large-scale community intervention PEACH™ QLD is described. While the CONSORT Statement was used to report findings from two previous RCTs, the REAIM framework was more suitable for the evaluation of upscaled delivery of the PEACH™ program. Evaluation of PEACH™ QLD was undertaken during the project delivery period from 2013 to 2016. Experiential learnings from conducting the evaluation of PEACH™ QLD to the described evaluation framework are presented for the purposes of informing the future evaluation of upscaled programs. Evaluation changes in response to real-time changes in the delivery of the PEACH™ QLD Project were necessary at stages during the project term. Key evaluation challenges encountered included the collection of complete evaluation data from a diverse and geographically dispersed workforce and the systematic collection of process evaluation data in real time to support program changes during the project. Evaluation of large-scale community interventions in the real world is challenging and divergent from RCTs which are rigourously evaluated within a more tightly-controlled clinical research setting. Constructs explored in an RCT are inadequate in describing the enablers and barriers of upscaled community program implementation. Methods for data collection, analysis and reporting also require consideration. We present a number of experiential reflections and suggestions for the successful evaluation of future upscaled community programs which are scarcely reported in the literature. PEACH™ QLD was retrospectively registered with the Australian New Zealand Clinical Trials Registry on 28 February 2017 (ACTRN12617000315314).
2014-01-01
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351
Cherokee Wind Energy Development - Feasibility and Pre-Construction Studies
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMillan, Andy
Cherokee Nation Businesses (CNB) received a grant from the US Department of Energy to explore feasibility and pursue development of a wind power generation facility on Cherokee land in north-central Oklahoma. This project followed several years of initial study exploring the possibility of commercial-scale wind power generation on primarily agricultural land owned by the Cherokee Nation. This project produced detailed analysis of the legal, financial and market viability of such generation facilities, and encompassed a full technical evaluation of the engineering, environmental, and geotechnical aspects of installing this capacity. During the course of this project, information gleaned from this explorationmore » changed CNB’s thinking about the best course of action for Cherokee participation in the development, eventually moving away from an equity-owner model and towards utilization of the land asset as a resource while mitigating Cherokee financial and operational risk.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pedlowski, M.A.; Dale, V.H.
Road development and colonization projects have brought about wide-scale deforestation in the Brazilian Amazon. The state of Rondonia, located in the western Amazon Basin, best exemplifies the problems related to land-use changes because it has the highest rates of deforestation in the Amazon Basin. In order to identify the main land-use practices in Rondonia, interviews with local farmers were carried out in the central part of Rondonia, in the PIC (Integrated Colonization Project) Ouro Preto do Oeste. This is the oldest colonization project in the state. The governmental colonization programs attracted migrants to the area through the construction of roadsmore » and infrastructure necessary for the colonists to occupy the land for agricultural practices. The interviews were done on lots of the PIC Ouro Preto and in PAD Urupa to define the background of the colonists, their land-use practices, their economic situation, and their relationships with governmental institutions.« less
Teaching Technical Competencies for Fluid Mechanics Research
NASA Astrophysics Data System (ADS)
Tagg, Randall
2014-11-01
We are developing an ``on demand'' framework for students to learn techniques used in fluid mechanics research. The site for this work is a university-grade laboratory situated next to Gateway High School in Aurora, Colorado. Undergraduate university students work with K-12 students on research and technical innovation projects. Both groups need customized training as their projects proceed. A modular approach allows particular competencies such as pump selection, construction of flow piping and channels, flow visualization, and specific flow measurement methods to be acquired through focused lessons. These lessons can be learned in either a stand-alone fashion or assembled into units for formal courses. A research example was a student project on diffusion of infectious material in micro-gravity in the event of an intestinal puncture wound. A curriculum example is a 9-week quarter of high-school instruction on instrumentation that uses small-scale water treatment systems as a case study.
Social cost in construction projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr
Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, J.; Sultan, M.; Environmental Research
2002-05-10
A two-dimensional groundwater flow model was constructed to investigate the long-term hydrologic impacts of Lake Nasser and the major land reclamation projects that use excess lake water in southwest Egypt. Egypt constructed (1964-1971) the Aswan High Dam, creating the Lake Nasser reservoir (length: 500 km; average width: 12 km) and is constructing the Tushka Canal to channel 5.0x10{sup 9} m{sup 3}/yr of Lake Nasser water to reclaim 0.5x10{sup 6} acres of desert lands. The model, constrained by regional-scale groundwater flow and near-lake head data, was successfully calibrated to temporal-observation heads from 1970 to 2000 that reflect variations in lake levels.more » Predictive analyses for the subsequent 50-yr period were conducted by employing the calibrated model. Simulations of long-term effects, beyond year 2000, of Lake Nasser on recharge and temporal groundwater head (base case scenario) show that recharge from the lake will continue at a much slower rate than during the 30-yr period of 1970-2000 (with approximately 86% reduction in 30-yr recharge). The modest projected pumping and injection activities in the study area are not expected to cause major deviation in the overall head distribution compared to the base case scenario. The investigation of effects of the new irrigation land development on the Nubian aquifer indicated that many of the proposed irrigation areas, especially those with small aquifer thickness, will become fully saturated with introduced water, resulting in potential flooding and salinization.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witwer, Keith S.; Dysland, Eric J.; Garfield, J. S.
2008-02-22
The GeoMelt® In-Container Vitrification™ (ICV™) process was selected by the U.S. Department of Energy (DOE) in 2004 for further evaluation as the supplemental treatment technology for Hanford’s low-activity waste (LAW). Also referred to as “bulk vitrification,” this process combines glass forming minerals, LAW, and chemical amendments; dries the mixture; and then vitrifies the material in a refractory-lined steel container. AMEC Nuclear Ltd. (AMEC) is adapting its GeoMelt ICV™ technology for this application with technical and analytical support from Pacific Northwest National Laboratory (PNNL). The DVBS project is funded by the DOE Office of River Protection and administered by CH2M HILLmore » Hanford Group, Inc. The Demonstration Bulk Vitrification Project (DBVS) was initiated to engineer, construct, and operate a full-scale bulk vitrification pilot-plant to treat up to 750,000 liters of LAW from Waste Tank 241-S-109 at the DOE Hanford Site. Since the beginning of the DBVS project in 2004, testing has used laboratory, crucible-scale, and engineering-scale equipment to help establish process limitations of selected glass formulations and identify operational issues. Full-scale testing has provided critical design verification of the ICV™ process before operating the Hanford pilot-plant. In 2007, the project’s fifth full-scale test, called FS-38D, (also known as the Integrated Dryer Melter Test, or IDMT,) was performed. This test had three primary objectives: 1) Demonstrate the simultaneous and integrated operation of the ICV™ melter with a 10,000-liter dryer, 2) Demonstrate the effectiveness of a new feed reformulation and change in process methodology towards reducing the production and migration of molten ionic salts (MIS), and, 3) Demonstrate that an acceptable glass product is produced under these conditions. Testing was performed from August 8 to 17, 2007. Process and analytical results demonstrated that the primary test objectives, along with a dozen supporting objectives, were successfully met. Glass performance exceeded all disposal performance criteria. A previous issue with MIS containment was successfully resolved in FS-38D, and the ICV™ melter was integrated with a full-scale, 10,000-liter dryer. This paper describes the rationale for performing the test, the purpose and outcome of scale-up tests preceding it, and the performance and outcome of FS-38D.« less
Improving concrete overlay construction.
DOT National Transportation Integrated Search
2010-03-01
Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...
Risk Management in Construction Project: Taking Fairness into Account
NASA Astrophysics Data System (ADS)
Górecki, Jarosław; Bizon-Górecka, Jadwiga
2017-10-01
Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises towards a problem of the fair behaviour. These behaviours, relating to individual stakeholders, have been underlined in different phases of the construction projects’ life cycle.
Assessing the costs attributed to project delay during project pre-construction stages
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
Assessing the costs attributed to project delay during project pre-construction stages.
DOT National Transportation Integrated Search
2016-03-01
This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...
ERIC Educational Resources Information Center
Duncan, Verne A.
This handbook for construction project planning was developed to be used by the Oregon Department of Education to evaluate existing facilities and determine the projected needs for each of the community college districts. Each college district's eligibility for state participation in funding is based on a Basic Space Need (BSN) which is the square…
Code of Federal Regulations, 2010 CFR
2010-10-01
... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...
ERIC Educational Resources Information Center
Goldblatt, Steven M.; Wood, R. Craig
Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...
NASA Astrophysics Data System (ADS)
Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan
2017-12-01
The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.
The influence of client brief and change order in construction project
NASA Astrophysics Data System (ADS)
Mahat, N. A. A.; Adnan, H.
2018-02-01
Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.
Additive Construction with Mobile Emplacement (ACME)
NASA Technical Reports Server (NTRS)
Vickers, John
2015-01-01
The Additive Construction with Mobile Emplacement (ACME) project is developing technology to build structures on planetary surfaces using in-situ resources. The project focuses on the construction of both 2D (landing pads, roads, and structure foundations) and 3D (habitats, garages, radiation shelters, and other structures) infrastructure needs for planetary surface missions. The ACME project seeks to raise the Technology Readiness Level (TRL) of two components needed for planetary surface habitation and exploration: 3D additive construction (e.g., contour crafting), and excavation and handling technologies (to effectively and continuously produce in-situ feedstock). Additionally, the ACME project supports the research and development of new materials for planetary surface construction, with the goal of reducing the amount of material to be launched from Earth.
Co-Production of Electricity and Hydrogen Using a Novel Iron-based Catalyst
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hilaly, Ahmad; Georgas, Adam; Leboreiro, Jose
2011-09-30
The primary objective of this project was to develop a hydrogen production technology for gasification applications based on a circulating fluid-bed reactor and an attrition resistant iron catalyst. The work towards achieving this objective consisted of three key activities: Development of an iron-based catalyst suitable for a circulating fluid-bed reactor; Design, construction, and operation of a bench-scale circulating fluid-bed reactor system for hydrogen production; Techno-economic analysis of the steam-iron and the pressure swing adsorption hydrogen production processes. This report describes the work completed in each of these activities during this project. The catalyst development and testing program prepared and iron-basedmore » catalysts using different support and promoters to identify catalysts that had sufficient activity for cyclic reduction with syngas and steam oxidation and attrition resistance to enable use in a circulating fluid-bed reactor system. The best performing catalyst from this catalyst development program was produced by a commercial catalyst toll manufacturer to support the bench-scale testing activities. The reactor testing systems used during material development evaluated catalysts in a single fluid-bed reactor by cycling between reduction with syngas and oxidation with steam. The prototype SIP reactor system (PSRS) consisted of two circulating fluid-bed reactors with the iron catalyst being transferred between the two reactors. This design enabled demonstration of the technical feasibility of the combination of the circulating fluid-bed reactor system and the iron-based catalyst for commercial hydrogen production. The specific activities associated with this bench-scale circulating fluid-bed reactor systems that were completed in this project included design, construction, commissioning, and operation. The experimental portion of this project focused on technical demonstration of the performance of an iron-based catalyst and a circulating fluid-bed reactor system for hydrogen production. Although a technology can be technically feasible, successful commercial deployment also requires that a technology offer an economic advantage over existing commercial technologies. To effective estimate the economics of this steam-iron process, a techno-economic analysis of this steam iron process and a commercial pressure swing adsorption process were completed. The results from this analysis described in this report show the economic potential of the steam iron process for integration with a gasification plant for coproduction of hydrogen and electricity.« less
Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat
2013-09-01
The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.
Hiilangaay Hydroelectric Project – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Twitchell, Sara; Stimac, Michael; Lang, Lisa
2016-06-01
The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less
Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province
NASA Astrophysics Data System (ADS)
Rani, Hafnidar A.
2016-11-01
The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.
McIntosh Unit 4 PCFB demonstration project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dodd, A.M.; Dryden, R.J.; Morehead, H.T.
1997-12-31
The City of Lakeland, Foster Wheeler Corporation and Westinghouse Electric Corporation have embarked on a utility scale demonstration of Pressurized Circulating Fluidized Bed (PCFB) technology at Lakeland`s McIntosh Power Station in Lakeland, Florida. The US Department of Energy will be providing approximately $195 million of funding for the project through two Cooperative Agreements under the auspices of the Clean Coal Technology Program. The project will involve the commercial demonstration of Foster Wheeler Pyroflow PCFB technology integrated with Westinghouse`s Hot Gas Filter (HGF) and power generation technologies. The total project duration will be approximately eight years and will be structured intomore » three separate phases; two years of design and permitting, followed by an initial period of two years of fabrication and construction and concluding with a four year demonstration (commercial operation) period. It is expected that the project will show that Foster Wheeler`s Pyroflow PCFB technology coupled with Westinghouse`s HGF and power generation technologies represents a cost effective, high efficiency, low emissions means of adding greenfield generation capacity and that this same technology is also well suited for repowering applications.« less
Stereoscopic display of 3D models for design visualization
NASA Astrophysics Data System (ADS)
Gilson, Kevin J.
2006-02-01
Advances in display technology and 3D design visualization applications have made real-time stereoscopic visualization of architectural and engineering projects a reality. Parsons Brinkerhoff (PB) is a transportation consulting firm that has used digital visualization tools from their inception and has helped pioneer the application of those tools to large scale infrastructure projects. PB is one of the first Architecture/Engineering/Construction (AEC) firms to implement a CAVE- an immersive presentation environment that includes stereoscopic rear-projection capability. The firm also employs a portable stereoscopic front-projection system, and shutter-glass systems for smaller groups. PB is using commercial real-time 3D applications in combination with traditional 3D modeling programs to visualize and present large AEC projects to planners, clients and decision makers in stereo. These presentations create more immersive and spatially realistic presentations of the proposed designs. This paper will present the basic display tools and applications, and the 3D modeling techniques PB is using to produce interactive stereoscopic content. The paper will discuss several architectural and engineering design visualizations we have produced.
NASA Astrophysics Data System (ADS)
Witherspoon, Paul A.
This is a review of research at Berkeley over the past 35 years on characterization of fractured rocks and their hydrologic behavior when subjected to perturbations of various kinds. The parallel plate concept was useful as a first approach, but researchers have found that it has limitations when used to examine rough fractures and understand effects of aperture distributions on heterogeneous flow paths, especially when the fracture is deformed under stress. Results of investigations have been applied to fractured and faulted geothermal systems, where the inherent, nonisothermal conditions produce a different kind of perturbation. In 1977, the Stripa project in Sweden provided an unusual underground laboratory excavated in granite where new methods of investigating fractured rock were developed. New theoretical studies have been carried out on the fundamental role of heterogeneous flow paths in controlling fluid migration in fractured rocks. A major field study is now underway at the Yucca Mountain Project in Nevada, where a site for a radioactive waste repository may be constructed. The main effort has been to characterize the rock mass (fractured tuff) in sufficient detail so that a site scale model can be constructed and used to simulate operation of the repository. A new and entirely different problem has been identified through infiltration tests in the fractured basalt layers of the Eastern Snake River Plane in Idaho. Water flow through the unusual heterogeneities of these layers is so erratic that a model based on a hierarchy of scales is being investigated.
Agricultural Construction Volume I. Arc Welding Project Construction. Instructor's Guide.
ERIC Educational Resources Information Center
Brzozowski, Dick; Admire, Myron
This guide contains instructor's materials for teaching a secondary agricultural construction course consisting of instructional units on arc welding (8 lessons) and project construction (14 lessons). The materials for each unit include student objectives, a list of competencies from which the objectives were derived, suggestions for motivating…
Evaluation of construction strategies for PCC pavement rehabilitation projects.
DOT National Transportation Integrated Search
2010-09-30
This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...
NASA Astrophysics Data System (ADS)
Radziszewska-Zielina, E.; Szewczyk, B.
2017-10-01
The aim of the article is to present examples of actions that can be undertaken in order to improve partnering cooperation in construction projects. These actions are a practical supplementation to the previously developed fuzzy system of controlling partnering relations in construction projects. The actions relate to 18 parameters of partnering relations that describe cooperation between a general contractor or a company that manages the project and four other participants: the contractors (subcontractors), the designer, the material and equipment suppliers and the real estate developer. The actions have been listed based on a review of subject literature, self-analysis, as well as interviews with participants of construction projects. They can provide examples of good practices that maintain partnering cooperation at a high level. Good cooperation, in turn, translates into a better performance of the project.
Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira
2018-02-19
Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.
Acoustic scaling: A re-evaluation of the acoustic model of Manchester Studio 7
NASA Astrophysics Data System (ADS)
Walker, R.
1984-12-01
The reasons for the reconstruction and re-evaluation of the acoustic scale mode of a large music studio are discussed. The design and construction of the model using mechanical and structural considerations rather than purely acoustic absorption criteria is described and the results obtained are given. The results confirm that structural elements within the studio gave rise to unexpected and unwanted low-frequency acoustic absorption. The results also show that at least for the relatively well understood mechanisms of sound energy absorption physical modelling of the structural and internal components gives an acoustically accurate scale model, within the usual tolerances of acoustic design. The poor reliability of measurements of acoustic absorption coefficients, is well illustrated. The conclusion is reached that such acoustic scale modelling is a valid and, for large scale projects, financially justifiable technique for predicting fundamental acoustic effects. It is not appropriate for the prediction of fine details because such small details are unlikely to be reproduced exactly at a different size without extensive measurements of the material's performance at both scales.
The S-curve for forecasting waste generation in construction projects.
Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling
2016-10-01
Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.
The Non-Axisymmetric Milky Way
NASA Technical Reports Server (NTRS)
Spergel, David N.
1996-01-01
The Dwek et al. model represents the current state-of-the-art model for the stellar structure of our Galaxy. The improvements we have made to this model take a number of forms: (1) the construction of a more detailed dust model so that we can extend our modeling to the galactic plane; (2) simultaneous fits to the bulge and the disk; (3) the construction of the first self-consistent model for a galactic bar; and (4) the development and application of algorithms for constructing nonparametric bar models. The improved Galaxy model has enabled a number of exciting science projects. In Zhao et al., we show that the number and duration of microlensing events seen by the OGLE and MACHO collaborations towards the bulge were consistent with the predictions of our bar model. In Malhotra et al., we constructed an infrared Tully-Fisher (TF) relation for the local group. We found the tightest TF relation ever seen in any band and in any group of galaxies. The tightness of the correlation places strong constraints on galaxy formation models and provides a independent check of the Cepheid distance scale.
Siragusa, Enrico; Haiminen, Niina; Utro, Filippo; Parida, Laxmi
2017-10-09
Computer simulations can be used to study population genetic methods, models and parameters, as well as to predict potential outcomes. For example, in plant populations, predicting the outcome of breeding operations can be studied using simulations. In-silico construction of populations with pre-specified characteristics is an important task in breeding optimization and other population genetic studies. We present two linear time Simulation using Best-fit Algorithms (SimBA) for two classes of problems where each co-fits two distributions: SimBA-LD fits linkage disequilibrium and minimum allele frequency distributions, while SimBA-hap fits founder-haplotype and polyploid allele dosage distributions. An incremental gap-filling version of previously introduced SimBA-LD is here demonstrated to accurately fit the target distributions, allowing efficient large scale simulations. SimBA-hap accuracy and efficiency is demonstrated by simulating tetraploid populations with varying numbers of founder haplotypes, we evaluate both a linear time greedy algoritm and an optimal solution based on mixed-integer programming. SimBA is available on http://researcher.watson.ibm.com/project/5669.
NASA Astrophysics Data System (ADS)
Vasilieva, V. N.
2017-11-01
The article deals with the solution of problems in AutoCAD offered at the All-Russian student Olympiads at the section of “Computer graphics” that are not typical for the students of construction specialties. The students are provided with the opportunity to study the algorithm for solving original tasks of high complexity. The article shows how the unknown parameter underlying the construction can be determined using a parametric drawing with geometric constraints and dimensional dependencies. To optimize the mark-up operation, the use of the command for projecting the points and lines of different types onto bodies and surfaces in different directions is shown. For the construction of a spring with a different pitch of turns, the paper describes the creation of a block from a part of the helix and its scaling when inserted into a model with unequal coefficients along the axes. The advantage of the NURBS surface and the application of the “body-surface-surface-NURBS-body” conversion are reflected to enhance the capabilities of both solid and surface modeling. The article’s material introduces construction students into the method of constructing complex models in AutoCAD that are not similar to typical training assignments.
NASA Technical Reports Server (NTRS)
Acoustadelcampo, C. (Principal Investigator)
1974-01-01
The author has identified the following significant results. Comparison between ERTS-1 image scale 1:1,000,000 and CETENAL's charts scale 1:50,000 in irrigated land surface determination in one selected spot gave the following results: Surface on CETENAL's charts 129,900 Has. and arbitrarily we gave 100 percent to this value. Surface on image 122,400 Has., 94.5 percent of the first value. It is necessary to use all four bands to have optimum results on the interpretation. The Principal investigator made use of photointerpretation techniques only, mostly monoscopically.
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2012 CFR
2012-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2013 CFR
2013-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2014 CFR
2014-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2011 CFR
2011-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?
Code of Federal Regulations, 2010 CFR
2010-04-01
... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...
A review of risk management process in construction projects of developing countries
NASA Astrophysics Data System (ADS)
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
NASA Astrophysics Data System (ADS)
Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana
2018-03-01
The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.
How Can Lean Construction Improve the Daily Schedule of A Construction Manager?
NASA Astrophysics Data System (ADS)
Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin
2017-10-01
The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.
ERIC Educational Resources Information Center
Graham, Charles W.; Geva, Anat
2001-01-01
An interdisciplinary studio project involved architecture and construction students. Evaluation of the integrated studio experience found that it gave students an accurate picture of professional practice. Architecture students were made more aware of building materials, construction technology, and cost; construction science students better…
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes carry out construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.291 May Self-Governance Tribes carry out construction projects without assuming these Federal environmental...
77 FR 42696 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... construction awards, 30 requests for amendments to non-construction awards, 2 project service maps). Average Hours Per Response: 2 hours for an amendment to a construction award, 1 hour for an amendment to a non-construction award, 6 hours for a project service map. Burden Hours: 1,242. Needs and Uses: A recipient must...
NASA Astrophysics Data System (ADS)
Gädeke, Anne; Gusyev, Maksym; Magome, Jun; Sugiura, Ai; Cullmann, Johannes; Takeuchi, Kuniyoshi
2015-04-01
The global flood risk assessment is prerequisite to set global measurable targets of post-Hyogo Framework for Action (HFA) that mobilize international cooperation and national coordination towards disaster risk reduction (DRR) and requires the establishment of a uniform flood risk assessment methodology on various scales. To address these issues, the International Flood Initiative (IFI) has initiated a Flagship Project, which was launched in year 2013, to support flood risk reduction benchmarking at global, national and local levels. In the Flagship Project road map, it is planned to identify the original risk (1), to identify the reduced risk (2), and to facilitate the risk reduction actions (3). In order to achieve this goal at global, regional and local scales, international research collaboration is absolutely necessary involving domestic and international institutes, academia and research networks such as UNESCO International Centres. The joint collaboration by ICHARM and BfG was the first attempt that produced the first step (1a) results on the flood discharge estimates with inundation maps under way. As a result of this collaboration, we demonstrate the outcomes of the first step of the IFI Flagship Project to identify flood hazard in the Rhine river basin on the global and local scale. In our assessment, we utilized a distributed hydrological Block-wise TOP (BTOP) model on 20-km and 0.5-km scales with local precipitation and temperature input data between 1980 and 2004. We utilized existing 20-km BTOP model, which is applied globally, and constructed the local scale 0.5-km BTOP model for the Rhine River basin. For the BTOP model results, both calibrated 20-km and 0.5-km BTOP models had similar statistical performance and represented observed flood river discharges, epecially for 1993 and 1995 floods. From 20-km and 0.5-km BTOP simulation, the flood discharges of the selected return period were estimated using flood frequency analysis and were comparable to the the river gauging station data at the German part of the Rhine river basin. This is an important finding that both 0.5-km and 20-km BTOP models produce similar flood peak discharges although the 0.5-km BTOP model results indicate the importance of scale in the local flood hazard assessment. In summary, we highlight that this study serves as a demonstrative example of institutional collaboration and is stepping stone for the next step implementation of the IFI Flagship Project.
Commercial-scale biotherapeutics manufacturing facility for plant-made pharmaceuticals.
Holtz, Barry R; Berquist, Brian R; Bennett, Lindsay D; Kommineni, Vally J M; Munigunti, Ranjith K; White, Earl L; Wilkerson, Don C; Wong, Kah-Yat I; Ly, Lan H; Marcel, Sylvain
2015-10-01
Rapid, large-scale manufacture of medical countermeasures can be uniquely met by the plant-made-pharmaceutical platform technology. As a participant in the Defense Advanced Research Projects Agency (DARPA) Blue Angel project, the Caliber Biotherapeutics facility was designed, constructed, commissioned and released a therapeutic target (H1N1 influenza subunit vaccine) in <18 months from groundbreaking. As of 2015, this facility was one of the world's largest plant-based manufacturing facilities, with the capacity to process over 3500 kg of plant biomass per week in an automated multilevel growing environment using proprietary LED lighting. The facility can commission additional plant grow rooms that are already built to double this capacity. In addition to the commercial-scale manufacturing facility, a pilot production facility was designed based on the large-scale manufacturing specifications as a way to integrate product development and technology transfer. The primary research, development and manufacturing system employs vacuum-infiltrated Nicotiana benthamiana plants grown in a fully contained, hydroponic system for transient expression of recombinant proteins. This expression platform has been linked to a downstream process system, analytical characterization, and assessment of biological activity. This integrated approach has demonstrated rapid, high-quality production of therapeutic monoclonal antibody targets, including a panel of rituximab biosimilar/biobetter molecules and antiviral antibodies against influenza and dengue fever. © 2015 Society for Experimental Biology, Association of Applied Biologists and John Wiley & Sons Ltd.
24 CFR 92.206 - Eligible project costs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...
Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading
NASA Astrophysics Data System (ADS)
Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.
2012-12-01
Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
NASA Astrophysics Data System (ADS)
Lewis, S.; Dunbar, R. B.; Mucciarone, D.; Barkdull, M.
2017-12-01
Scientific tools assessing impacts to watershed and coastal ecosystem services, like those from land-use land conversion (LULC), are critical for sustainable land management strategies. Small island nations are particularly vulnerable to LULC threats, especially sediment delivery, given their small spatial size and reliance on natural resources. In the Republic of Palau, a small Pacific island country, three major land-use activities—construction, fires, and agriculture— have increased sediment delivery to important estuarine and coastal habitats (i.e., rivers, mangroves, coral reefs) over the past 30 years. This project examines the predictive capacity of an ecosystem services model, Natural Capital Project's InVEST, for sediment delivery using historic land-use and coral geochemical analysis. These refined model projections are used to assess ecosystem services tradeoffs under different future land development and management scenarios. Coral cores (20-41cm in length) were sampled along a high-to-low sedimentation gradient (i.e., near major rivers (high-impact) and ocean (low-impact)) in Micronesia's largest estuary, Ngeremeduu Bay. Isotopic indicators of seasonality (δ18O and δ13C values (% VPDB)) were used to construct the age model for each core. Barium, Manganese, and Yttrium were used as trace metal proxies for sedimentation and measured in each core using a laser ablation ICP-MS. Finally, the Natural Capital Project's InVEST sediment delivery model was paired with Geospatial data to examine the drivers of sediment delivery (i.e., construction, farms and fires) within these two watersheds. A thirty-year record of trace metal to calcium ratios in coral skeletons show a peak in sedimentation during 2006 and 2007, and in 2012. These results suggest historic peaks in sediment delivery correlating to large-scale road construction and support previous findings that Ngeremeduu Bay has reached a tipping point of retaining sediment. Natural Capital's project InVEST sediment delivery model results suggest fires increases sediment exportation by an order of magnitude compared with the other major land-use activities. A refined measure of LULC from a novel database (earth-moving permits) will be used to develop a more accurate depiction of sediment delivery to estuarine and coastal habitats.
Code of Federal Regulations, 2013 CFR
2013-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2012 CFR
2012-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Code of Federal Regulations, 2014 CFR
2014-10-01
... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...
Streamlined project closeout for construction at KYTC.
DOT National Transportation Integrated Search
2017-09-01
Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...
24 CFR 884.122 - Separate project requirement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...
24 CFR 884.122 - Separate project requirement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...
2016-09-01
unneeded to support U.S. forces in the CENTCOM area of responsibility and in future contingencies worldwide. View GAO-16-406. For more information...DEFENSE INFRASTRUCTURE Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency ...Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations Why GAO Did This Study For about 15 years, DOD
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...
Informal worker phenomenon in housing construction project
NASA Astrophysics Data System (ADS)
Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh
2017-11-01
The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.
[French scale validation of the Infant Behavior Questionnaire three months after birth].
Lacombe, Marie; Delmas, Philippe; Carrier, Nathalie; Rabillon, Florence; Couture, Marie-Estelle
2015-06-01
Breastfeeding is recognize to be the perfect food of mother and child's health. The child's temperament is one of the factors that may explain pursuing the breastfeeding. Few instruments are available in French to measure this factor. The objective of the study is to present and validate the French translation of the scale "Infant Behavior Questionnaire" (IBQ). The sample consists of 193 primaparous or multiparous women who gave birth in a maternity in Paris. The child's temperament questionnaire was sent by mail three months after the birth. The same questionnaire was sent to a sub-sample of 30 women 15 days later. Analyses were conducted to assess the temporal stability, internal consistency, construct validity and predictive. The different results tend to show a compliant validity to the french scale version. This first IBQ French-language validation is worth pursuing in order to confirm the scale factor structure and participate to studies supporting mothers in their breastfeeding project.
Studies of Sub-Synchronous Oscillations in Large-Scale Wind Farm Integrated System
NASA Astrophysics Data System (ADS)
Yue, Liu; Hang, Mend
2018-01-01
With the rapid development and construction of large-scale wind farms and grid-connected operation, the series compensation wind power AC transmission is gradually becoming the main way of power usage and improvement of wind power availability and grid stability, but the integration of wind farm will change the SSO (Sub-Synchronous oscillation) damping characteristics of synchronous generator system. Regarding the above SSO problem caused by integration of large-scale wind farms, this paper focusing on doubly fed induction generator (DFIG) based wind farms, aim to summarize the SSO mechanism in large-scale wind power integrated system with series compensation, which can be classified as three types: sub-synchronous control interaction (SSCI), sub-synchronous torsional interaction (SSTI), sub-synchronous resonance (SSR). Then, SSO modelling and analysis methods are categorized and compared by its applicable areas. Furthermore, this paper summarizes the suppression measures of actual SSO projects based on different control objectives. Finally, the research prospect on this field is explored.
The application of micro UAV in construction project
NASA Astrophysics Data System (ADS)
Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura
2017-10-01
In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.
Time Overrun in Construction Project
NASA Astrophysics Data System (ADS)
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.
Research on the Construction of Remote Sensing Automatic Interpretation Symbol Big Data
NASA Astrophysics Data System (ADS)
Gao, Y.; Liu, R.; Liu, J.; Cheng, T.
2018-04-01
Remote sensing automatic interpretation symbol (RSAIS) is an inexpensive and fast method in providing precise in-situ information for image interpretation and accuracy. This study designed a scientific and precise RSAIS data characterization method, as well as a distributed and cloud architecture massive data storage method. Additionally, it introduced an offline and online data update mode and a dynamic data evaluation mechanism, with the aim to create an efficient approach for RSAIS big data construction. Finally, a national RSAIS database with more than 3 million samples covering 86 land types was constructed during 2013-2015 based on the National Geographic Conditions Monitoring Project of China and then annually updated since the 2016 period. The RSAIS big data has proven to be a good method for large scale image interpretation and field validation. It is also notable that it has the potential to solve image automatic interpretation with the assistance of deep learning technology in the remote sensing big data era.
Code of Federal Regulations, 2010 CFR
2010-10-01
... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...
48 CFR 836.602-2 - Evaluation boards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...
DOT National Transportation Integrated Search
2009-05-01
Wisconsin has constructed many environmental mitigation projects in conjunction with transportation projects that have been implemented according : to the National Environmental Policy Act. Other mitigation projects have been constructed pursuant to ...
Architectural design of the science complex at Elizabeth City State University
NASA Technical Reports Server (NTRS)
Jahromi, Soheila
1993-01-01
This paper gives an overall view of the architectural design process and elements in taking an idea from conception to execution. The project presented is an example for this process. Once the need for a new structure is established, an architect studies the requirements, opinions and limits in creating a structure that people will exist in, move through, and use. Elements in designing a building include factors such as volume and surface, light and form changes of scale and view, movement and stasis. Some of the other factors are functions and physical conditions of construction. Based on experience, intuition, and boundaries, an architect will utilize all elements in creating a new building. In general, the design process begins with studying the spatial needs which develop into an architectural program. A comprehensive and accurate architectural program is essential for having a successful building. The most attractive building which does not meet the functional needs of its users has failed at the primary reason for its existence. To have a good program an architect must have a full understanding of the daily functions that will take place in the building. The architectural program along with site characteristics are among a few of the important guidelines in studying the form, adjacencies, and circulation for the structure itself and also in relation to the adjacent structures. Conceptual studies are part of the schematic design, which is the first milestone in the design process. The other reference points are design development and construction documents. At each milestone, review and coordination with all the consultants is established, and the user is essential in refining the project. In design development phase, conceptual diagrams take shape, and architectural, structural, mechanical, and electrical systems are developed. The final phase construction documents convey all the information required to construct the building. The design process and elements described were applied in the following project.
Modeling and simulation of high dimensional stochastic multiscale PDE systems at the exascale
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zabaras, Nicolas J.
2016-11-08
Predictive Modeling of multiscale and Multiphysics systems requires accurate data driven characterization of the input uncertainties, and understanding of how they propagate across scales and alter the final solution. This project develops a rigorous mathematical framework and scalable uncertainty quantification algorithms to efficiently construct realistic low dimensional input models, and surrogate low complexity systems for the analysis, design, and control of physical systems represented by multiscale stochastic PDEs. The work can be applied to many areas including physical and biological processes, from climate modeling to systems biology.
Status of The General Atomics Low Speed Urban Maglev Technology Development Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gurol, S; Baldi, R; Bever, D
2004-06-16
This paper presents the status of General Atomics Urban Maglev Program. The development provides an innovative approach for low speed transportation suitable for very challenging urban environments. Permanent magnets arranged in a 'Halbach' array configuration produce a relatively stiff magnetic suspension operating with an air gap of 25 mm. The project has progressed from design and prototype hardware testing, to the construction of a 120-meter full-scale test track, located in San Diego, California. Dynamic testing of the levitation, propulsion and guidance systems is being performed.
Flow control about an airborne laser turret
NASA Astrophysics Data System (ADS)
Penix, L. E.
1982-06-01
This thesis project is the latest in a series of experiments conducted at the Naval Postgraduate School to improve the air flow in which a laser beam propagates. The particular turret to be studied is currently employed on Airborne Laser Laboratory which is aboard the NKC-135 aircraft; a one-third scale model was constructed in the 5 x 5 foot wind tunnel. The objective is to decrease the optical path distortion and jitter resulting from turbulent flow in the aft hemisphere of the turret that houses the laser telescope.
NASA Technical Reports Server (NTRS)
Bush, Harold
1991-01-01
Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.
NASA Astrophysics Data System (ADS)
Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.
2017-08-01
Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.
Winters, Nancy C; Myers, Kathleen; Proud, Laura
2002-10-01
This is the third article in a series of 10-year reviews of rating scales. Here, the authors review scales that are useful in tapping the affective disturbances experienced with various psychiatric disorders, including suicidality, cognitive style, and self-esteem. The authors sampled articles incorporating these constructs over the past 25 years and selected scales with established uses or new development. Those presented here have adequate psychometric properties and high utility for efficiently elucidating youths' functioning, plus either wide literature citations or a special niche. These scales were developed bimodally. Many were developed in the 1980s when internalizing disorders were elucidated, but there has been a resurgence of interest in these constructs. Scales assessing suicidality have clear constructs, whereas scales of cognitive style demonstrate deficits in developmental relevance, and scales of self-esteem suffer from lax constructs. The constructs underlying these scales tap core symptoms of internalizing disorders, mediate the expression of affective disturbances associated with various disorders, and depict the impairments resulting from these disorders. Overall, the psychometrics of these scales are adequate. These scales provide a broader representation of youths' functioning than that conveyed with diagnostic scales alone.
2006-10-01
Investigation of Item-Pair Presentation and Construct Validity of the Navy Computer Adaptive Personality Scales ( NCAPS ) Christina M. Underhill, Ph.D...Construct Validity of the Navy Computer Adaptive Personality Scales ( NCAPS ) Christina M. Underhill, Ph.D. Reviewed and Approved by Jacqueline A. Mottern...and Construct Validity of the Navy Computer Adaptive Personality Scales ( NCAPS ) 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 0602236N and 0603236N 6
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...
ERIC Educational Resources Information Center
Keller, Edward C.; Hartman, William T.
2001-01-01
Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…
40 CFR 40.145-3 - Projects involving construction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-3 Projects involving construction. Research... have a fee simple or such other estate or interest in the site of the project, and rights of access, as... the project. (b) Invitations for bids or requests for proposals shall be based upon a clear and...
40 CFR 40.145-3 - Projects involving construction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-3 Projects involving construction. Research... have a fee simple or such other estate or interest in the site of the project, and rights of access, as... the project. (b) Invitations for bids or requests for proposals shall be based upon a clear and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.
2012-07-01
The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less
Distinction of Concept and Discussion on Construction Idea of Smart Water Grid Project
NASA Astrophysics Data System (ADS)
Ye, Y.; Yizi, S., Sr.; Lili, L., Sr.; Sang, X.; Zhai, J.
2016-12-01
Smart water grid project includes construction of water physical grid consisting of various flow regulating infrastructures, construction of water information grid in line with the trend of intelligent technology and construction of water management grid featured by system & mechanism construction and systemization of regulation decision-making. It is the integrated platform and comprehensive carrier for water conservancy practices. Currently, there still is dispute over engineering construction idea of smart water grid which, however, represents the future development trend of water management and is increasingly emphasized. The paper, based on distinction of concept of water grid and water grid engineering, explains the concept of water grid intelligentization, actively probes into construction idea of Smart water grid project in our country and presents scientific problems to be solved as well as core technologies to be mastered for smart water grid construction.
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is unveiled at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility is ready for operation at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
2009-11-19
CAPE CANAVERAL, Fla. – NASA's first large-scale solar power generation facility opens at NASA's Kennedy Space Center in Florida. Representatives from NASA, Florida Power & Light Company, or FPL, and SunPower Corporation formally commissioned the one-megawatt facility and announced plans to pursue a new research, development and demonstration project at Kennedy to advance America's use of renewable energy. The facility is the first element of a major renewable energy project currently under construction at Kennedy. The completed system features a fixed-tilt, ground-mounted solar power system designed and built by SunPower, along with SunPower solar panels. A 10-megawatt solar farm, which SunPower is building on nearby Kennedy property, will supply power to FPL's customers when it is completed in April 2010. Photo credit: NASA/Jim Grossmann
Ultrasonic humidification for telecommunications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Longo, F.
1994-03-01
This article examines two installations which demonstrate that ultrasonic humidification is an excellent option for large-scale commercial installations. Many existing telephone switching centers constructed 20 to 30 years ago were equipped with electro-mechanical switching equipment that was not sensitive to humidity. Today's sophisticated solid-state telecommunications equipment requires specific levels of relative humidity to operate properly. Over the last several years, Einhorn Yaffee Prescott (formerly Rose Beaton + Rose) designed two of the largest ultrasonic humidification systems at telecommunications buildings located in Cheshire, Conn., and White Plains, N.Y. The Cheshire project was a retrofit to the existing system in a 1960smore » building; the White Plains project involved an upgrade to a totally new air handling system, including an ultrasonic humidification component, in a 1950s building.« less
Marler, Thomas E.; Lindström, Anders J.
2017-01-01
ABSTRACT Conservation agencies charged with care of threatened plant species should be governed by the concepts that conservation actions should do no harm. Adaptive management research progresses in imperfect situations due to incomplete knowledge. Interpreting new experimental or observational evidence for inclusion in conservation plans should first consider the big picture by identifying collateral quandaries before scaling up the approach to large-scale implementation. We discuss a case study of Cycas micronesica conservation activities on the island of Guam. The use of large stem cuttings has been shown to be a viable approach for rescuing trees from planned construction sites. However, this artificial means of producing transplants exhibits shortcomings, some of which may add new threats to the existing plant population. Moreover, devoting funds for use of the new technique in tree rescue projects does not address the primary threats that have led to listing under the United States Endangered Species Act (ESA). Transplanted trees will likely succumb to those ubiquitous threats shortly after the completion of a successful rescue project. Alternatively, investing conservation funds into mitigation of the primary threats could lead to removal of the species from the ESA. PMID:29260802
NASA Astrophysics Data System (ADS)
Entwistle, Elizabeth; Curtis, Andrew; Galetti, Erica; Baptie, Brian; Meles, Giovanni
2015-04-01
If energy emitted by a seismic source such as an earthquake is recorded on a suitable backbone array of seismometers, source-receiver interferometry (SRI) is a method that allows those recordings to be projected to the location of another target seismometer, providing an estimate of the seismogram that would have been recorded at that location. Since the other seismometer may not have been deployed at the time the source occurred, this renders possible the concept of 'retrospective seismology' whereby the installation of a sensor at one period of time allows the construction of virtual seismograms as though that sensor had been active before or after its period of installation. Using the benefit of hindsight of earthquake location or magnitude estimates, SRI can establish new measurement capabilities closer to earthquake epicenters, thus potentially improving earthquake location estimates. Recently we showed that virtual SRI seismograms can be constructed on target sensors in both industrial seismic and earthquake seismology settings, using both active seismic sources and ambient seismic noise to construct SRI propagators, and on length scales ranging over 5 orders of magnitude from ~40 m to ~2500 km[1]. Here we present the results from earthquake seismology by comparing virtual earthquake seismograms constructed at target sensors by SRI to those actually recorded on the same sensors. We show that spatial integrations required by interferometric theory can be calculated over irregular receiver arrays by embedding these arrays within 2D spatial Voronoi cells, thus improving spatial interpolation and interferometric results. The results of SRI are significantly improved by restricting the backbone receiver array to include approximately those receivers that provide a stationary phase contribution to the interferometric integrals. We apply both correlation-correlation and correlation-convolution SRI, and show that the latter constructs virtual seismograms with fewer non-physical arrivals. Finally we reconstruct earthquake seismograms at sensors that were previously active but were subsequently removed before the earthquakes occurred; thus we create virtual earthquake seismograms at those sensors, truly retrospectively. Such SRI seismograms can be used to create a catalogue of new, virtual earthquake seismograms that are available to complement real earthquake data in future earthquake seismology studies. [1]E. Entwistle, Curtis, A., Galetti, E., Baptie, B., Meles, G., Constructing new seismograms from old earthquakes: Retrospective seismology at multiple length scales, JGR, in press.
Development of high-rise buildings: digitalization of life cycle management
NASA Astrophysics Data System (ADS)
Gusakova, Elena
2018-03-01
The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What does a Self-Governance Tribe do if it wants to..., DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section...
DOT National Transportation Integrated Search
1976-01-01
Three construction projects affecting streams are being monitored. On two of the projects, those affecting Meadow Run and Moores Creek, the streams are being monitored for flow, suspended solids, rainfall, and benthic populations. Construction has be...
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227
Memon, Aftab Hameed; Rahman, Ismail Abdul
2014-01-01
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
Assessing performance characteristics of sediment basins constructed in Franklin County.
DOT National Transportation Integrated Search
2012-08-01
The objective of the research project was to monitor the performance of newly designed : sediment basins that were constructed on the ALDOT 502 project in Franklin County. The : project included four tasks: (1) assess performance characteristics of s...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hosking, H.
The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.
2016-09-30
Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti S E P T E M B E R 3 0 , 2 0 1 6 Report...Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti Visit us at www.dodig.mil Objective We...Findings (cont’d) ii │ DODIG-2016-141 (Project No. D2014-D000RE-0157.000) Results in Brief Improvements Needed in Managing Scope Changes and Oversight