Space shuttle maintenance program planning document
NASA Technical Reports Server (NTRS)
Brown, D. V.
1972-01-01
A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.
NASA Astrophysics Data System (ADS)
Xie, Chang; Wen, Jing; Liu, Wenying; Wang, Jiaming
With the development of intelligent dispatching, the intelligence level of network control center full-service urgent need to raise. As an important daily work of network control center, the application of maintenance scheduling intelligent arrangement to achieve high-quality and safety operation of power grid is very important. By analyzing the shortages of the traditional maintenance scheduling software, this paper designs a power grid maintenance scheduling intelligence arrangement supporting system based on power flow forecasting, which uses the advanced technologies in maintenance scheduling, such as artificial intelligence, online security checking, intelligent visualization techniques. It implements the online security checking of maintenance scheduling based on power flow forecasting and power flow adjusting based on visualization, in order to make the maintenance scheduling arrangement moreintelligent and visual.
Data Base Development of Automobile and Light Truck Maintenance : Volume II. Appendix E.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
NASA Astrophysics Data System (ADS)
Pattabhiraman, Sriram
Airplane fuselage structures are designed with the concept of damage tolerance, wherein small damage are allowed to remain on the airplane, and damage that otherwise affect the safety of the structure are repaired. The damage critical to the safety of the fuselage are repaired by scheduling maintenance at pre-determined intervals. Scheduling maintenance is an interesting trade-off between damage tolerance and cost. Tolerance of larger damage would require less frequent maintenance and hence, a lower cost, to maintain a certain level of reliability. Alternatively, condition-based maintenance techniques have been developed using on-board sensors, which track damage continuously and request maintenance only when the damage size crosses a particular threshold. This effects a tolerance of larger damage than scheduled maintenance, leading to savings in cost. This work quantifies the savings of condition-based maintenance over scheduled maintenance. The work also quantifies converting the cost savings into weight savings. Structural health monitoring will need time to be able to establish itself as a stand-alone system for maintenance, due to concerns on its diagnosis accuracy and reliability. This work also investigates the effect of synchronizing structural health monitoring system with scheduled maintenance. This work uses on-board SHM equipment skip structural airframe maintenance (a subsect of scheduled maintenance), whenever deemed unnecessary while maintain a desired level of safety of structure. The work will also predict the necessary maintenance for a fleet of airplanes, based on the current damage status of the airplanes. The work also analyses the possibility of false alarm, wherein maintenance is being requested with no critical damage on the airplane. The work use SHM as a tool to identify lemons in a fleet of airplanes. Lemons are those airplanes that would warrant more maintenance trips than the average behavior of the fleet.
Power plant maintenance scheduling using ant colony optimization: an improved formulation
NASA Astrophysics Data System (ADS)
Foong, Wai Kuan; Maier, Holger; Simpson, Angus
2008-04-01
It is common practice in the hydropower industry to either shorten the maintenance duration or to postpone maintenance tasks in a hydropower system when there is expected unserved energy based on current water storage levels and forecast storage inflows. It is therefore essential that a maintenance scheduling optimizer can incorporate the options of shortening the maintenance duration and/or deferring maintenance tasks in the search for practical maintenance schedules. In this article, an improved ant colony optimization-power plant maintenance scheduling optimization (ACO-PPMSO) formulation that considers such options in the optimization process is introduced. As a result, both the optimum commencement time and the optimum outage duration are determined for each of the maintenance tasks that need to be scheduled. In addition, a local search strategy is presented in this article to boost the robustness of the algorithm. When tested on a five-station hydropower system problem, the improved formulation is shown to be capable of allowing shortening of maintenance duration in the event of expected demand shortfalls. In addition, the new local search strategy is also shown to have significantly improved the optimization ability of the ACO-PPMSO algorithm.
Code of Federal Regulations, 2011 CFR
2011-01-01
... authorization, registration and filing of schedules, reciprocal arrangements, and maintenance of identity of... and filing of schedules, reciprocal arrangements, and maintenance of identity of consignments. (a... and will not result in duplication of charges or services. (d) Maintenance of identity of consignments...
Code of Federal Regulations, 2013 CFR
2013-01-01
... authorization, registration and filing of schedules, reciprocal arrangements, and maintenance of identity of... and filing of schedules, reciprocal arrangements, and maintenance of identity of consignments. (a... and will not result in duplication of charges or services. (d) Maintenance of identity of consignments...
Code of Federal Regulations, 2012 CFR
2012-01-01
... authorization, registration and filing of schedules, reciprocal arrangements, and maintenance of identity of... and filing of schedules, reciprocal arrangements, and maintenance of identity of consignments. (a... and will not result in duplication of charges or services. (d) Maintenance of identity of consignments...
76 FR 67633 - Airworthiness Directives; Dassault Aviation Model Mystere-Falcon 50 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
...) of section 5-10 of the Recommended Maintenance Schedules chapter of the Aircraft Maintenance...) of section 5-10 of the Recommended Maintenance Schedules chapter of the Aircraft Maintenance... Dassault Falcon 50/ 50EX Maintenance Procedure 57-607, Non-Destructive Check of Flap Tracks 2 and 5, of...
NASA Astrophysics Data System (ADS)
Witantyo; Rindiyah, Anita
2018-03-01
According to data from maintenance planning and control, it was obtained that highest inventory value is non-routine components. Maintenance components are components which procured based on maintenance activities. The problem happens because there is no synchronization between maintenance activities and the components required. Reliability Centered Maintenance method is used to overcome the problem by reevaluating maintenance activities required components. The case chosen is roller mill system because it has the highest unscheduled downtime record. Components required for each maintenance activities will be determined by its failure distribution, so the number of components needed could be predicted. Moreover, those components will be reclassified from routine component to be non-routine component, so the procurement could be carried out regularly. Based on the conducted analysis, failure happens in almost every maintenance task are classified to become scheduled on condition task, scheduled discard task, schedule restoration task and no schedule maintenance. From 87 used components for maintenance activities are evaluated and there 19 components that experience reclassification from non-routine components to routine components. Then the reliability and need of those components were calculated for one-year operation period. Based on this invention, it is suggested to change all of the components in overhaul activity to increase the reliability of roller mill system. Besides, the inventory system should follow maintenance schedule and the number of required components in maintenance activity so the value of procurement will be decreased and the reliability system will increase.
Laboratory services series: a programmed maintenance system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuxbury, D.C.; Srite, B.E.
1980-01-01
The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.
A particle swarm model for estimating reliability and scheduling system maintenance
NASA Astrophysics Data System (ADS)
Puzis, Rami; Shirtz, Dov; Elovici, Yuval
2016-05-01
Modifying data and information system components may introduce new errors and deteriorate the reliability of the system. Reliability can be efficiently regained with reliability centred maintenance, which requires reliability estimation for maintenance scheduling. A variant of the particle swarm model is used to estimate reliability of systems implemented according to the model view controller paradigm. Simulations based on data collected from an online system of a large financial institute are used to compare three component-level maintenance policies. Results show that appropriately scheduled component-level maintenance greatly reduces the cost of upholding an acceptable level of reliability by reducing the need in system-wide maintenance.
NASA Astrophysics Data System (ADS)
Nagata, Takeshi; Tao, Yasuhiro; Utatani, Masahiro; Sasaki, Hiroshi; Fujita, Hideki
This paper proposes a multi-agent approach to maintenance scheduling in restructured power systems. The restructuring of electric power industry has resulted in market-based approaches for unbundling a multitude of service provided by self-interested entities such as power generating companies (GENCOs), transmission providers (TRANSCOs) and distribution companies (DISCOs). The Independent System Operator (ISO) is responsible for the security of the system operation. The schedule submitted to ISO by GENCOs and TRANSCOs should satisfy security and reliability constraints. The proposed method consists of several GENCO Agents (GAGs), TARNSCO Agents (TAGs) and a ISO Agent(IAG). The IAG’s role in maintenance scheduling is limited to ensuring that the submitted schedules do not cause transmission congestion or endanger the system reliability. From the simulation results, it can be seen the proposed multi-agent approach could coordinate between generation and transmission maintenance schedules.
1987-06-01
NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center
Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling
As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...
Monitoring Strategies in Permeable Pavement Systems to Optimize Maintenance Scheduling - abstract
As the surface in a permeable pavement system clogs and performance decreases, maintenance is required to preserve the design function. Currently, guidance is limited for scheduling maintenance on an as needed basis. Previous research has shown that surface clogging in a permea...
40 CFR 86.428-80 - Maintenance, scheduled; test vehicles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Maintenance, scheduled; test vehicles... PROGRAMS (CONTINUED) CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES Emission... vehicles. (a) Periodic maintenance on the engine, emission control system, and fuel system of test vehicles...
Two-machine flow shop scheduling integrated with preventive maintenance planning
NASA Astrophysics Data System (ADS)
Wang, Shijin; Liu, Ming
2016-02-01
This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.
49 CFR 214.533 - Schedule of repairs subject to availability of parts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Maintenance Machines and Hi-Rail Vehicles § 214.533 Schedule of repairs subject to availability of parts. (a... 49 Transportation 4 2011-10-01 2011-10-01 false Schedule of repairs subject to availability of... maintenance machine or a hi-rail vehicle by the end of the next business day following the report of the...
Strategic Gang Scheduling for Railroad Maintenance
DOT National Transportation Integrated Search
2012-08-14
We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...
49 CFR 214.533 - Schedule of repairs subject to availability of parts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Maintenance Machines and Hi-Rail Vehicles § 214.533 Schedule of repairs subject to availability of parts. (a... maintenance machine or a hi-rail vehicle by the end of the next business day following the report of the... maintenance machine or hi-rail vehicle within seven calendar days after receiving the necessary part. The...
The ATA-67 Formula for Direct Operating Cost
NASA Technical Reports Server (NTRS)
Faulkner, H. B.
1972-01-01
The ATA formulas for direct operating cost were developed for the purpose of comparing different aircraft, existing or not, on the same route or the same aircraft on different routes. Such characteristics of the airline as crew pay, maintenance procedures, and depreciation schedules are kept constant. In air transportation systems analysis the 1967 ATA formula is usually used with appropriate exceptions or modifications, such as: different maintenance labor rate, total maintenance multiplied by a factor, maintenance burden deleted, different depreciation schedule, or different spares percentages.
Value of information of repair times for offshore wind farm maintenance planning
NASA Astrophysics Data System (ADS)
Seyr, Helene; Muskulus, Michael
2016-09-01
A large contribution to the total cost of energy in offshore wind farms is due to maintenance costs. In recent years research has focused therefore on lowering the maintenance costs using different approaches. Decision support models for scheduling the maintenance exist already, dealing with different factors influencing the scheduling. Our contribution deals with the uncertainty in the repair times. Given the mean repair times for different turbine components we make some assumptions regarding the underlying repair time distribution. We compare the results of a decision support model for the mean times to repair and those repair time distributions. Additionally, distributions with the same mean but different variances are compared under the same conditions. The value of lowering the uncertainty in the repair time is calculated and we find that using distributions significantly decreases the availability, when scheduling maintenance for multiple turbines in a wind park. Having detailed information about the repair time distribution may influence the results of maintenance modeling and might help identify cost factors.
NASA Astrophysics Data System (ADS)
Sembiring, N.; Nasution, A. H.
2018-02-01
Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.
NASA Astrophysics Data System (ADS)
Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.
2016-08-01
In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.
78 FR 48608 - Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AIWW), Chesapeake, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... maintenance of the moveable spans on the structure. The current operating schedule for the bridge is set out... deviation from the operating schedule that governs the operation of the I64 Bridge across the Atlantic... necessary to facilitate maintenance work on the moveable spans. This temporary deviation allows the...
2007-10-19
HGPI); Combustion Inspections (CI); and inspection and scheduled critical maintenance on all auxillary systems of the four GE Frame 9E units located...Work requirements for a functional end product. 6 services and scheduled critical maintenance on all auxillary systems of the four GE Frame
77 FR 12175 - Airworthiness Directives; DASSAULT AVIATION Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... specified products. The MCAI states: The Maintenance Procedure (MP) 57-607, related to non destructive check... Recommended Maintenance Schedules chapter of the Aircraft Maintenance Documentation. After the implementation... maintenance program to include ``Non-Destructive Check of Flap Tracks 2 and 5,'' Maintenance Procedure 57-607...
MacDuff, G S; Krantz, P J; McClannahan, L E
1993-01-01
We used a graduated guidance procedure to teach 4 boys with autism to follow photographic activity schedules to increase on-task and on-schedule behavior. The multiple baseline across participants design included baseline, teaching, maintenance, resequencing of photographs, and generalization to novel photographs phases. The results indicated that photographic activity schedules (albums depicting after-school activities) produced sustained engagement, and skills generalized to a new sequence of photographs and to new photographs. The acquisition of schedule-following skills enabled these children with severe developmental disabilities to display lengthy response chains, independently change activities, and change activities in different group home settings in the absence of immediate supervision and prompts from others. PMID:8473261
NASA Astrophysics Data System (ADS)
Shah, Rahul H.
Production costs account for the largest share of the overall cost of manufacturing facilities. With the U.S. industrial sector becoming more and more competitive, manufacturers are looking for more cost and resource efficient working practices. Operations management and production planning have shown their capability to dramatically reduce manufacturing costs and increase system robustness. When implementing operations related decision making and planning, two fields that have shown to be most effective are maintenance and energy. Unfortunately, the current research that integrates both is limited. Additionally, these studies fail to consider parameter domains and optimization on joint energy and maintenance driven production planning. Accordingly, production planning methodology that considers maintenance and energy is investigated. Two models are presented to achieve well-rounded operating strategy. The first is a joint energy and maintenance production scheduling model. The second is a cost per part model considering maintenance, energy, and production. The proposed methodology will involve a Time-of-Use electricity demand response program, buffer and holding capacity, station reliability, production rate, station rated power, and more. In practice, the scheduling problem can be used to determine a joint energy, maintenance, and production schedule. Meanwhile, the cost per part model can be used to: (1) test the sensitivity of the obtained optimal production schedule and its corresponding savings by varying key production system parameters; and (2) to determine optimal system parameter combinations when using the joint energy, maintenance, and production planning model. Additionally, a factor analysis on the system parameters is conducted and the corresponding performance of the production schedule under variable parameter conditions, is evaluated. Also, parameter optimization guidelines that incorporate maintenance and energy parameter decision making in the production planning framework are discussed. A modified Particle Swarm Optimization solution technique is adopted to solve the proposed scheduling problem. The algorithm is described in detail and compared to Genetic Algorithm. Case studies are presented to illustrate the benefits of using the proposed model and the effectiveness of the Particle Swarm Optimization approach. Numerical Experiments are implemented and analyzed to test the effectiveness of the proposed model. The proposed scheduling strategy can achieve savings of around 19 to 27 % in cost per part when compared to the baseline scheduling scenarios. By optimizing key production system parameters from the cost per part model, the baseline scenarios can obtain around 20 to 35 % in savings for the cost per part. These savings further increase by 42 to 55 % when system parameter optimization is integrated with the proposed scheduling problem. Using this method, the most influential parameters on the cost per part are the rated power from production, the production rate, and the initial machine reliabilities. The modified Particle Swarm Optimization algorithm adopted allows greater diversity and exploration compared to Genetic Algorithm for the proposed joint model which results in it being more computationally efficient in determining the optimal scheduling. While Genetic Algorithm could achieve a solution quality of 2,279.63 at an expense of 2,300 seconds in computational effort. In comparison, the proposed Particle Swarm Optimization algorithm achieved a solution quality of 2,167.26 in less than half the computation effort which is required by Genetic Algorithm.
Multi-objective group scheduling optimization integrated with preventive maintenance
NASA Astrophysics Data System (ADS)
Liao, Wenzhu; Zhang, Xiufang; Jiang, Min
2017-11-01
This article proposes a single-machine-based integration model to meet the requirements of production scheduling and preventive maintenance in group production. To describe the production for identical/similar and different jobs, this integrated model considers the learning and forgetting effects. Based on machine degradation, the deterioration effect is also considered. Moreover, perfect maintenance and minimal repair are adopted in this integrated model. The multi-objective of minimizing total completion time and maintenance cost is taken to meet the dual requirements of delivery date and cost. Finally, a genetic algorithm is developed to solve this optimization model, and the computation results demonstrate that this integrated model is effective and reliable.
Managing Highway Maintenance: Standards for Maintenance Work, Part 1, Unit 8, Level 2.
ERIC Educational Resources Information Center
Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.
Part of the series "Managing Highway Maintenance," the unit is about maintenance standards and is designed for superintendents and senior foremen who are responsible for scheduling and controlling routine maintenance. It describes different kinds of standards, why and how standards are developed, and how standards are to be used and…
77 FR 27115 - Drawbridge Operation Regulations; Raritan River, Perth Amboy, NJ
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-09
... the draw may remain in the closed position for four days to facilitate mechanical maintenance. Vessels... scheduled mechanical maintenance at the bridge. In order to perform the bridge maintenance the bridge must...
ERIC Educational Resources Information Center
Daniel, Clarence H.
This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…
Browns Ferry turbine team-it`s all in the planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-05-01
This article illustrates a good example of how a project was creatively completed ahead of schedule and under budget. When the Brown`s Ferry turbine maintenance team took on the task of servicing unit 2`s turbine, the work was like building a ship in a bottle. {open_quotes}We had no room in which to work and only standard tools for the maintenance{close_quotes}, said Jim Roche, turbine manager. The big problem on the turbine floor is that there is only one single overhead crane for lifting the turbine components. All the major turbine components and support equipment are on the same floor. Eachmore » one requires a crane, and there is only one crane. There is limited laydown space. To do the maintenance properly, the team had to have a maintenance schedule it felt comfortable with, industry experience, tools yet to be invented, and money. The design method for this schedule is presented.« less
Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.
ERIC Educational Resources Information Center
Foerster, James; And Others
Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…
Optimal Preventive Maintenance Schedule based on Lifecycle Cost and Time-Dependent Reliability
2011-11-10
Page 1 of 16 UNCLASSIFIED: Distribution Statement A. Approved for public release. 12IDM-0064 Optimal Preventive Maintenance Schedule based... 1 . INTRODUCTION Customers and product manufacturers demand continued functionality of complex equipment and processes. Degradation of material...Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response
75 FR 7411 - Schedule of Water Charges
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... sale revenues, while the costs of reservoir maintenance and operations, contractual services and..., ``including debt service, operation, maintenance, replacement, reserves, and associated administrative costs... holds funds dedicated to pay the costs of project construction, operation, maintenance, and replacement...
NASA Astrophysics Data System (ADS)
Sembiring, N.; Panjaitan, N.; Saragih, A. F.
2018-02-01
PT. XYZ is a manufacturing company that produces fresh fruit bunches (FFB) to Crude Palm Oil (CPO) and Palm Kernel Oil (PKO). PT. XYZ consists of six work stations: receipt station, sterilizing station, thressing station, pressing station, clarification station, and kernelery station. So far, the company is still implementing corrective maintenance maintenance system for production machines where the machine repair is done after damage occurs. Problems at PT. XYZ is the absence of scheduling engine maintenance in a planned manner resulting in the engine often damaged which can disrupt the smooth production. Another factor that is the problem in this research is the kernel station environment that becomes less convenient for operators such as there are machines and equipment not used in the production area, slippery, muddy, scattered fibers, incomplete use of PPE, and lack of employee discipline. The most commonly damaged machine is in the seed processing station (kernel station) which is cake breaker conveyor machine. The solution of this problem is to propose a schedule plan for maintenance of the machine by using the method of reliability centered maintenance and also the application of 5S. The result of the application of Reliability Centered maintenance method is obtained four components that must be treated scheduled (time directed), namely: for bearing component is 37 days, gearbox component is 97 days, CBC pen component is 35 days and conveyor pedal component is 32 days While after identification the application of 5S obtained the proposed corporate environmental improvement measures in accordance with the principles of 5S where unused goods will be moved from the production area, grouping goods based on their use, determining the procedure of cleaning the production area, conducting inspection in the use of PPE, and making 5S slogans.
Chen, Tony Y H; Ponsot, Yves; Brouillette, Martin; Tétrault, Jean-Píerre; Tu, Le Mai
2007-06-01
The study evaluates the effect of chronic usage, beyond the recommended maintenance schedule, on the efficacy of electromagnetic lithotripter. To our knowledge, there is no publication investigating the effect of chronic usage on the electromagnetic lithotripter, despite the maintenance schedule established by the manufacturers. Our goal is to verify if the acoustic parameters of the shock wave changed with usage, and if this change could be associated with change in clinical efficacy. This study lasted 18 months. Every 6 months the lithotripter's efficacy was evaluated in two ways: objectively and clinically. Objective efficacy was measured using a piezoelectric hydrophone and artificial stones to capture the acoustic parameters and the crater of fragmentation, respectively. Clinical efficacy data was collected by studying the rate of successful extracorporeal shock wave lithotripsy treatment in patients with urolithiasis. The changes in clinical efficacy, acoustic parameters, and craters of fragmentation were compared and analyzed with appropriate statistical methods. Five hundred twenty five patients participated in the study. The clinical efficacy remained stable throughout the three observation periods (55.7%, 66.2% and 55.5%; p = 0.11). The focal head of the lithotripter was used three times the recommended schedule. There was no obvious change in the acoustic parameters of the shock waves, and the focal zone remained stable. The clinical efficacy of the electromagnetic lithotripter appears to be stable despite usage beyond the recommended maintenance schedule. More studies are needed to validate the safety of this practice.
Scheduling Jobs and a Variable Maintenance on a Single Machine with Common Due-Date Assignment
Wan, Long
2014-01-01
We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. The goal is to minimize the total earliness, tardiness, and due-date cost. We derive some properties on an optimal solution for our problem. For a special case with identical jobs we propose an optimal polynomial time algorithm followed by a numerical example. PMID:25147861
Code of Federal Regulations, 2010 CFR
2010-07-01
... preventative maintenance schedule and, as applicable, detailed descriptions of the corrective action procedures... compliance with the operation and maintenance requirements that apply to me? 63.7826 Section 63.7826... Compliance Requirements § 63.7826 How do I demonstrate initial compliance with the operation and maintenance...
NASA Astrophysics Data System (ADS)
Zhang, Zhong
In this work, motivated by the need to coordinate transmission maintenance scheduling among a multiplicity of self-interested entities in restructured power industry, a distributed decision support framework based on multiagent negotiation systems (MANS) is developed. An innovative risk-based transmission maintenance optimization procedure is introduced. Several models for linking condition monitoring information to the equipment's instantaneous failure probability are presented, which enable quantitative evaluation of the effectiveness of maintenance activities in terms of system cumulative risk reduction. Methodologies of statistical processing, equipment deterioration evaluation and time-dependent failure probability calculation are also described. A novel framework capable of facilitating distributed decision-making through multiagent negotiation is developed. A multiagent negotiation model is developed and illustrated that accounts for uncertainty and enables social rationality. Some issues of multiagent negotiation convergence and scalability are discussed. The relationships between agent-based negotiation and auction systems are also identified. A four-step MAS design methodology for constructing multiagent systems for power system applications is presented. A generic multiagent negotiation system, capable of inter-agent communication and distributed decision support through inter-agent negotiations, is implemented. A multiagent system framework for facilitating the automated integration of condition monitoring information and maintenance scheduling for power transformers is developed. Simulations of multiagent negotiation-based maintenance scheduling among several independent utilities are provided. It is shown to be a viable alternative solution paradigm to the traditional centralized optimization approach in today's deregulated environment. This multiagent system framework not only facilitates the decision-making among competing power system entities, but also provides a tool to use in studying competitive industry relative to monopolistic industry.
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2013 CFR
2013-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2012 CFR
2012-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2014 CFR
2014-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
14 CFR 145.3 - Definition of terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... maintenance resulting from unforeseen events; or (2) Scheduled checks that contain servicing and/or... regulations and serving as the primary contact with the FAA. (b) Article means an aircraft, airframe, aircraft... for the work of a certificated repair station that performs maintenance, preventive maintenance...
Pollution Prevention in the Land Maintenance System
2000-04-01
pollutants, and greenhouse gases. Canada’s Land Maintenance System consists of first line field units, second line field units, base units and a repair...workshops. For example, extending maintenance schedules, using extended life products and using dehumidification for preservation of equipment will lower
NASA Astrophysics Data System (ADS)
Zhong, Shuya; Pantelous, Athanasios A.; Beer, Michael; Zhou, Jian
2018-05-01
Offshore wind farm is an emerging source of renewable energy, which has been shown to have tremendous potential in recent years. In this blooming area, a key challenge is that the preventive maintenance of offshore turbines should be scheduled reasonably to satisfy the power supply without failure. In this direction, two significant goals should be considered simultaneously as a trade-off. One is to maximise the system reliability and the other is to minimise the maintenance related cost. Thus, a non-linear multi-objective programming model is proposed including two newly defined objectives with thirteen families of constraints suitable for the preventive maintenance of offshore wind farms. In order to solve our model effectively, the nondominated sorting genetic algorithm II, especially for the multi-objective optimisation is utilised and Pareto-optimal solutions of schedules can be obtained to offer adequate support to decision-makers. Finally, an example is given to illustrate the performances of the devised model and algorithm, and explore the relationships of the two targets with the help of a contrast model.
Operation and Maintenance Resources for Small Drinking Water Systems
These documents and tools provide information on identifying treatment technologies that remove multiple contaminants, schedules for maintenance tasks and checklists, and logs for easily recording findings.
ERIC Educational Resources Information Center
Federal Highway Administration (DOT), Washington, DC. Offices of Research and Development.
Part of the series "Managing Highway Maintenance," the unit is designed for use with unit eight, level one, and unit 13, level two, and the certification tests for those units in the series. It contains typical management data and selected highway maintenance standards for the areas of: surface and shoulder; roadside and drainage; traffic…
41 CFR 102-34.275 - What kind of maintenance programs must we have?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What kind of maintenance programs must we have? 102-34.275 Section 102-34.275 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Scheduled Maintenance of Motor Vehicles § 102-34.275 What kind of maintenance programs...
NASA Technical Reports Server (NTRS)
1980-01-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
NASA Astrophysics Data System (ADS)
1980-09-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
18 CFR 368.3 - Schedule of records and periods of retention.
Code of Federal Regulations, 2013 CFR
2013-04-01
... companies. (c) Paid checks and receipts for payments of specific vouchers 5 years. (d) Authorization for the... and reports of condition of property Destroy when superseded. Maintenance 13. Maintenance project and work orders: (a) Authorizations for expenditures for maintenance work to be covered by project or work...
18 CFR 368.3 - Schedule of records and periods of retention.
Code of Federal Regulations, 2014 CFR
2014-04-01
... companies. (c) Paid checks and receipts for payments of specific vouchers 5 years. (d) Authorization for the... and reports of condition of property Destroy when superseded. Maintenance 13. Maintenance project and work orders: (a) Authorizations for expenditures for maintenance work to be covered by project or work...
76 FR 73477 - Airworthiness Directives; BAE SYSTEMS (Operations) Limited Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... of the AMM [aircraft maintenance manual] to introduce a new hydraulic filter assembly life limit and...: The BAe 146/AVRO 146-RJ Aircraft Maintenance Manual (AMM) includes chapters 05-10 ``Time Limits'', 05...'' and 05-20 ``Scheduled Maintenance Checks'', some sub-chapters of which have been identified as...
18 CFR 368.3 - Schedule of records and periods of retention.
Code of Federal Regulations, 2012 CFR
2012-04-01
... companies. (c) Paid checks and receipts for payments of specific vouchers 5 years. (d) Authorization for the... and reports of condition of property Destroy when superseded. Maintenance 13. Maintenance project and work orders: (a) Authorizations for expenditures for maintenance work to be covered by project or work...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
40 CFR 1065.410 - Maintenance limits for stabilized test engines.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Engine Selection, Preparation, and Maintenance § 1065... scheduled maintenance on emission data engines must be representative of what is planned to be available to... no longer use it as an emission-data engine. Also, if your test engine has a major mechanical failure...
40 CFR 1065.410 - Maintenance limits for stabilized test engines.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Engine Selection, Preparation, and Maintenance § 1065... scheduled maintenance on emission data engines must be representative of what is planned to be available to... no longer use it as an emission-data engine. Also, if your test engine has a major mechanical failure...
49 CFR Appendix A to Part 224 - Schedule of Civil Penalties1
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Schedule of Civil Penalties1 A Appendix A to Part 224 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... Appendix A to Part 224—Schedule of Civil Penalties1 Subpart B—Application, Inspection, and Maintenance of...
75 FR 56517 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... entry and replace with ``5 U.S.C. 6120, Flexible and Compressed Work Schedules, Purposes; DoD Directive... and tour of duty at the alternative worksite; regular work schedule (8 hours a day, flexitour or compressed); telework schedule. Authority for maintenance of the system: 5 U.S.C. 6120, Flexible and...
Optimal infrastructure maintenance scheduling problem under budget uncertainty.
DOT National Transportation Integrated Search
2010-05-01
This research addresses a general class of infrastructure asset management problems. Infrastructure : agencies usually face budget uncertainties that will eventually lead to suboptimal planning if : maintenance decisions are made without taking the u...
Software for Planning Scientific Activities on Mars
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre
2003-01-01
Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.
Survey of Condition Indicators for Condition Monitoring Systems (Open Access)
2014-09-29
Hinesburg, Vermont, 05461, USA jz@renewablenrgsystems.com ABSTRACT Currently, the wind energy industry is swiftly changing its maintenance strategy...from schedule based maintenance to predictive based maintenance . Condition monitoring systems (CMS) play an important role in the predictive... maintenance cycle. As condition monitoring systems are being adopted by more and more OEM and O&M service providers from the wind energy industry, it is
Maintenance Downtime April 23, 2014
Atmospheric Science Data Center
2014-04-23
Date(s): Wednesday, April 23, 2014 Time: 7:00 am - 5:00 pm EDT Event ... Due to scheduled maintenance Wednesday, April 23, 2014: The Data Pool, MISR order and browse tools, TES and MOPITT Search ...
Maintenance Downtime September 18, 2013
Atmospheric Science Data Center
2013-09-16
Date(s): Wednesday, September 18, 2013 Time: 9:00 - 11:00 am EST Event Impact: Due to scheduled maintenance Wednesday, September 18, 2013: The MISR order and browse tools, Reverb, and AMAPS will be ...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
40 CFR 1054.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2010 CFR
2010-07-01
... scheduled emission-related maintenance falls within 10 hours of a test point, delay the maintenance until the engine reaches the test point. Measure emissions before and after peforming the maintenance. Use... example, for the fuel line permeation standards starting in 2012, equipment manufacturers may order a...
Fontecha, John E; Akhavan-Tabatabaei, Raha; Duque, Daniel; Medaglia, Andrés L; Torres, María N; Rodríguez, Juan Pablo
In this work we tackle the problem of planning and scheduling preventive maintenance (PM) of sediment-related sewer blockages in a set of geographically distributed sites that are subject to non-deterministic failures. To solve the problem, we extend a combined maintenance and routing (CMR) optimization approach which is a procedure based on two components: (a) first a maintenance model is used to determine the optimal time to perform PM operations for each site and second (b) a mixed integer program-based split procedure is proposed to route a set of crews (e.g., sewer cleaners, vehicles equipped with winches or rods and dump trucks) in order to perform PM operations at a near-optimal minimum expected cost. We applied the proposed CMR optimization approach to two (out of five) operative zones in the city of Bogotá (Colombia), where more than 100 maintenance operations per zone must be scheduled on a weekly basis. Comparing the CMR against the current maintenance plan, we obtained more than 50% of cost savings in 90% of the sites.
Maglev guideway cost and construction schedule assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plotkin, D.; Kim, S.
1997-05-01
A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types ofmore » infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.« less
Maintaining consistency between planning hierarchies: Techniques and applications
NASA Technical Reports Server (NTRS)
Zoch, David R.
1987-01-01
In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.
Range and mission scheduling automation using combined AI and operations research techniques
NASA Technical Reports Server (NTRS)
Arbabi, Mansur; Pfeifer, Michael
1987-01-01
Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.
Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel
NASA Astrophysics Data System (ADS)
Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi
Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.
Code of Federal Regulations, 2010 CFR
2010-01-01
... authorization for the type aircraft checked. (3) A schedule that provides for the performance of bench checks..., Equipment, and Maintenance A Appendix A to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Maintenance 1. Category II Manual (a) Application for approval. An applicant for approval of a Category II...
Code of Federal Regulations, 2013 CFR
2013-01-01
... authorization for the type aircraft checked. (3) A schedule that provides for the performance of bench checks..., Equipment, and Maintenance A Appendix A to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Maintenance 1. Category II Manual (a) Application for approval. An applicant for approval of a Category II...
Code of Federal Regulations, 2012 CFR
2012-01-01
... authorization for the type aircraft checked. (3) A schedule that provides for the performance of bench checks..., Equipment, and Maintenance A Appendix A to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Maintenance 1. Category II Manual (a) Application for approval. An applicant for approval of a Category II...
Code of Federal Regulations, 2014 CFR
2014-01-01
... authorization for the type aircraft checked. (3) A schedule that provides for the performance of bench checks..., Equipment, and Maintenance A Appendix A to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Maintenance 1. Category II Manual (a) Application for approval. An applicant for approval of a Category II...
Code of Federal Regulations, 2011 CFR
2011-01-01
... authorization for the type aircraft checked. (3) A schedule that provides for the performance of bench checks..., Equipment, and Maintenance A Appendix A to Part 91 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Maintenance 1. Category II Manual (a) Application for approval. An applicant for approval of a Category II...
40 CFR 1054.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2011 CFR
2011-07-01
... scheduled emission-related maintenance falls within 10 hours of a test point, delay the maintenance until the engine reaches the test point. Measure emissions before and after peforming the maintenance. Use... data under 40 CFR 1060.235(e) for your emission family. (j) Continued use of 40 CFR part 90 test...
40 CFR 1054.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2012 CFR
2012-07-01
... scheduled emission-related maintenance falls within 10 hours of a test point, delay the maintenance until the engine reaches the test point. Measure emissions before and after peforming the maintenance. Use... data under 40 CFR 1060.235(e) for your emission family. (j) Continued use of 40 CFR part 90 test...
NASA Astrophysics Data System (ADS)
Zhang, Xingong; Yin, Yunqiang; Wu, Chin-Chia
2017-01-01
There is a situation found in many manufacturing systems, such as steel rolling mills, fire fighting or single-server cycle-queues, where a job that is processed later consumes more time than that same job when processed earlier. The research finds that machine maintenance can improve the worsening of processing conditions. After maintenance activity, the machine will be restored. The maintenance duration is a positive and non-decreasing differentiable convex function of the total processing times of the jobs between maintenance activities. Motivated by this observation, the makespan and the total completion time minimization problems in the scheduling of jobs with non-decreasing rates of job processing time on a single machine are considered in this article. It is shown that both the makespan and the total completion time minimization problems are NP-hard in the strong sense when the number of maintenance activities is arbitrary, while the makespan minimization problem is NP-hard in the ordinary sense when the number of maintenance activities is fixed. If the deterioration rates of the jobs are identical and the maintenance duration is a linear function of the total processing times of the jobs between maintenance activities, then this article shows that the group balance principle is satisfied for the makespan minimization problem. Furthermore, two polynomial-time algorithms are presented for solving the makespan problem and the total completion time problem under identical deterioration rates, respectively.
2008-03-01
order fulfillment visibility, Kanban deployment, inventory count can be made visually, machines and tool labeling, costs, preventive maintenance...order fulfillment, computer scheduling versus Kanban , pull versus push systems, flow time efficiencies, back room costs of scheduling, MRP costs
The 1988 Inland Waterway Review
1988-11-01
Maintenance Costs ............. 91 Table 4.3 Major Rehabilitation Projects: ............................... 92 Table 4.4 Scheduled Constructed Projects in the...Maintenance Costs .......................... 100 Figure 4.7 Operations and Maintenance Costs Per Ton Mile in 1986 For Inland Waterways Suspect to Fuel Tax...application of study and construction cost -sharing. It also increased waterway fuel taxes and created the Inland Waterways Users Board. In effect, the Act
2015-09-17
turbines , SHM tools, maintenance scheduling, and performance of the SHM system determine the added value of the system of systems (A. Van Horenbeek...J. R., & Pintelon, L. (2013). Quantifying the added value of an imperfectly performing condition monitoring system— Application to a wind turbine ...INTEGRATED SYSTEMS HEALTH MANAGEMENT AS AN ENABLER FOR CONDITION BASED MAINTENANCE AND AUTONOMIC
41 CFR 102-34.285 - Where can we obtain help in setting up a maintenance program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROPERTY 34-MOTOR VEHICLE MANAGEMENT Scheduled Maintenance of Motor Vehicles § 102-34.285 Where can we... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Where can we obtain help in setting up a maintenance program? 102-34.285 Section 102-34.285 Public Contracts and Property...
SUMO: operation and maintenance management web tool for astronomical observatories
NASA Astrophysics Data System (ADS)
Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa
2014-08-01
SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.
Multi-objective decision-making model based on CBM for an aircraft fleet
NASA Astrophysics Data System (ADS)
Luo, Bin; Lin, Lin
2018-04-01
Modern production management patterns, in which multi-unit (e.g., a fleet of aircrafts) are managed in a holistic manner, have brought new challenges for multi-unit maintenance decision making. To schedule a good maintenance plan, not only does the individual machine maintenance have to be considered, but also the maintenance of the other individuals have to be taken into account. Since most condition-based maintenance researches for aircraft focused on solely reducing maintenance cost or maximizing the availability of single aircraft, as well as considering that seldom researches concentrated on both the two objectives: minimizing cost and maximizing the availability of a fleet (total number of available aircraft in fleet), a multi-objective decision-making model based on condition-based maintenance concentrated both on the above two objectives is established. Furthermore, in consideration of the decision maker may prefer providing the final optimal result in the form of discrete intervals instead of a set of points (non-dominated solutions) in real decision-making problem, a novel multi-objective optimization method based on support vector regression is proposed to solve the above multi-objective decision-making model. Finally, a case study regarding a fleet is conducted, with the results proving that the approach efficiently generates outcomes that meet the schedule requirements.
NASA Astrophysics Data System (ADS)
Moghaddam, Kamran S.; Usher, John S.
2011-07-01
In this article, a new multi-objective optimization model is developed to determine the optimal preventive maintenance and replacement schedules in a repairable and maintainable multi-component system. In this model, the planning horizon is divided into discrete and equally-sized periods in which three possible actions must be planned for each component, namely maintenance, replacement, or do nothing. The objective is to determine a plan of actions for each component in the system while minimizing the total cost and maximizing overall system reliability simultaneously over the planning horizon. Because of the complexity, combinatorial and highly nonlinear structure of the mathematical model, two metaheuristic solution methods, generational genetic algorithm, and a simulated annealing are applied to tackle the problem. The Pareto optimal solutions that provide good tradeoffs between the total cost and the overall reliability of the system can be obtained by the solution approach. Such a modeling approach should be useful for maintenance planners and engineers tasked with the problem of developing recommended maintenance plans for complex systems of components.
2009-01-01
activities within the patrol area. Maintenance of the Minuteman III weapon system requires maintenance and security teams travel to one or more of 150...launch facilities, all of which are geograph- ically isolated from major population centers. Travel time from F. E. Warren AFB, the main support base...the F. E. Warren AFB work center to make travel preparations, and ends after all maintenance actions are completed, or once the team arrives at one
Reliability-based optimization of maintenance scheduling of mechanical components under fatigue
Beaurepaire, P.; Valdebenito, M.A.; Schuëller, G.I.; Jensen, H.A.
2012-01-01
This study presents the optimization of the maintenance scheduling of mechanical components under fatigue loading. The cracks of damaged structures may be detected during non-destructive inspection and subsequently repaired. Fatigue crack initiation and growth show inherent variability, and as well the outcome of inspection activities. The problem is addressed under the framework of reliability based optimization. The initiation and propagation of fatigue cracks are efficiently modeled using cohesive zone elements. The applicability of the method is demonstrated by a numerical example, which involves a plate with two holes subject to alternating stress. PMID:23564979
Maintenance of the Hanford cone penetrometer platform during fiscal year 1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
IWATATE, D.F.
This SOW describes services requested of Applied Research and Associates, Inc. (ARA), as a commercial provider of cone penetrometer equipment and services, to provide routine inspection and minimum preventive maintenance on the Hanford CP Platform (CPP) during Fiscal Year 1999. This SOW specifically pertains to the maintenance of the CPP and associated support equipment and is limited in scope to routine preventive maintenance and identification of any deficiencies. ARA is the original manufacturer of the CPP and will conduct this work following the vendor-prepared maintenance schedule.
May 23, 2012, Notice of Proposed Rulemaking with revisions related to emissions controls on diesel-powered emergency vehicles and revisions related to scheduled maintenance intervals for diesel engines and vehicles using Selective Catalytic Reduction (SCR)
41 CFR 101-39.303 - Maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MANAGEMENT SYSTEMS 39.3-Use and Care of GSA Interagency Fleet Management System Vehicles § 101-39.303...) vehicles, safety and preventive maintenance inspections will be performed at regularly scheduled intervals as directed by GSA. Users of GSA IFMS vehicles shall comply with the safety and preventive...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-05
... to these aircraft if Bombardier Service Bulletin (SB) 601-0590 [Scheduled Maintenance Instructions... information: Challenger 601 Time Limits/Maintenance Checks, PSP 601-5, Revision 38, dated June 19, 2009. Challenger 601 Time Limits/Maintenance Checks, PSP 601A-5, Revision 34, dated June 19, 2009. Challenger 604...
Hwang, Juwon; Shah, Dhavan V
2018-06-05
Parental concerns over the safety or necessity of childhood vaccination have increased over the past decades. At the same time, there has been a proliferation of vaccine-related information available through a range of health information sources. This study investigates the associations between evaluations of health information sources, parental perceptions of childhood vaccination benefits, and the maintenance of vaccination schedules for their children. Specifically, this study aims to (a) incorporate social media into the battery of health information sources and (b) differentiate households with a childhood autism diagnosis and those without, given unsubstantiated but persistent concerns about vaccine safety and autism. Analyzing a sample of U.S. households, a total of 4,174 parents who have at least one child under the age of 18 were analyzed, including 138 of parents of households with a childhood autism diagnosis. Results show that the more the parents value interpersonal communication and magazines as sources of health information, the more they perceive vaccination benefits, and the more the value they put on television, the better they keep vaccination schedules up-to-date for their children. On the other hand, social media are negatively associated with their perceptions of vaccination benefits. Although parents of children diagnosed with autism are less likely to perceive vaccination benefits, no interaction effects with evaluations of health information sources are found on parental perceptions of vaccination benefits or maintenance of schedules.
DOT National Transportation Integrated Search
2015-12-01
This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...
Optimizing work zones for highway maintenance with floating car data (FCD) : final report.
DOT National Transportation Integrated Search
2015-12-01
One of the main tools that the Department of Transportation (DOT) of each state in the United States should have to : support their work zone activities is a sound model that produces adequate work zone schedules for roadway maintenance : and constru...
78 FR 46615 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... process is available on request. Schedules Pending 1. Department of Defense, Defense Contract Management... officials. 2. Department of Defense, Defense Contract Management Agency (N1- 558-10-6, 6 items, 6 temporary... related to the production and maintenance of such records. 3. Department of Defense, Defense Logistics...
Concurrent Schedules of Reinforcement as "Challenges" to Maintenance
ERIC Educational Resources Information Center
Peterson, Stephanie M.; Frieder, Jessica E.; Quigley, Shawn P.; Kestner, Kathryn M.; Goyal, Manish; Smith, Shilo L.; Dayton, Elizabeth; Brower-Breitwieser, Carrie
2017-01-01
One measure of success for interventions treating problem behavior is the effects achieved in the face of a challenge (e.g., changes in reinforcement schedules, lapses in treatment integrity); one hopes to demonstrate persistence of appropriate alternatives and the absence of resurgence of target behaviors. The present study successfully treated…
78 FR 66266 - Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AIWW), Chesapeake, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... deviation from the operating schedule that governs the I64 Bridge across the Atlantic Intracoastal Waterway... deviation, call or email Mrs. Kashanda Booker, Bridge Administration Branch Fifth District, Coast Guard... maintenance of the moveable spans on the structure. The current operating schedule for the drawbridge is set...
NASA Technical Reports Server (NTRS)
Butcher, L.; Jonas, T.; Wood, W.
1982-01-01
The heavy schedule of tracking activities at the Echo Deep Space Station (DSS 12) prevents some time-consuming maintenance tasks from being performed. Careful coordination prior to and during a mandatory task (antenna panel replacement) made it possible to do a large number of unrelated tasks that ordinarily would have to be deferred. The maintenance and operations tasks accomplished during the downtime are described.
DOT National Transportation Integrated Search
2015-12-01
This project investigated INDOT equipment records and equipment industry standards to produce standard equipment specifications : and a predictive maintenance schedule for the more than 1100 single and tandem axle trucks in use at INDOT. The research...
14 CFR Sec. 19-2 - Maintenance of data.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Classifications Sec. 19-2 Maintenance of data. (a) Each air carrier required to file Form 41 Schedule T-100 data... classifications prescribed. Codes are prescribed for each operating element and service class. All traffic... that the enplanement/deplanement information be broken out into separate units called “on-flight market...
14 CFR Sec. 19-2 - Maintenance of data.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Classifications Sec. 19-2 Maintenance of data. (a) Each air carrier required to file Form 41 Schedule T-100 data... classifications prescribed. Codes are prescribed for each operating element and service class. All traffic... that the enplanement/deplanement information be broken out into separate units called “on-flight market...
40 CFR 205.162-3 - Instructions for maintenance, use, and repair.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.162-3... this purpose in mind. The instructions shall be clear and, to the extent practicable, written in non... contain a schedule for the performance of all required noise emission control maintenance. Space must be...
40 CFR 205.162-3 - Instructions for maintenance, use, and repair.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.162-3... this purpose in mind. The instructions shall be clear and, to the extent practicable, written in non... contain a schedule for the performance of all required noise emission control maintenance. Space must be...
40 CFR 205.162-3 - Instructions for maintenance, use, and repair.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.162-3... this purpose in mind. The instructions shall be clear and, to the extent practicable, written in non... contain a schedule for the performance of all required noise emission control maintenance. Space must be...
40 CFR 205.162-3 - Instructions for maintenance, use, and repair.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) NOISE ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycles § 205.162-3... this purpose in mind. The instructions shall be clear and, to the extent practicable, written in non... contain a schedule for the performance of all required noise emission control maintenance. Space must be...
7 CFR 1580.502 - Maintenance of records, audits and compliance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Internal Revenue Service Form 990-C, Farmers' Cooperative Association Income Tax Return; Form 1040, U.S. Individual Income Tax Return; Schedule C (Form 1040), Profit or Loss From Business; Schedule F (Form 1040... Income Tax Return; or Form 4835, Farm Rental Income and Expenses. (b) At all times during regular...
49 CFR 214.531 - Schedule of repairs; general.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Hi-Rail Vehicles § 214.531 Schedule of repairs; general. Except as provided in §§ 214.527(c)(5), 214.529, and 214.533, an on-track roadway maintenance machine or hi-rail vehicle that does not meet all... or hi-rail vehicle shall be placed out of on-track service. ...
Logistics Management: Cases Studies,
LOGISTICS , * MANAGEMENT PLANNING AND CONTROL), DECISION MAKING, INVENTORY CONTROL, SPARE PARTS, AIR FORCE EQUIPMENT, NAVAL AIRCRAFT, MAINTENANCE, DEPLOYMENT, SCHEDULING, SYSTEMS ENGINEERING, TEXTBOOKS
117. ARAI Shop and maintenance (ARA627) building roof and floor ...
117. ARA-I Shop and maintenance (ARA-627) building roof and floor plan. Includes room finish and equipment schedule. Norman Engineering Company 961-area/SF-627-A-1. Date: January 1959. Ineel index code no. 068-0627-00-613-102759. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
ERIC Educational Resources Information Center
California State Dept. of Education, Sacramento.
This handbook provides information that administrators of maintenance and operations in California schools can use in systematically planning and scheduling school facility support services. The first unit, chapter 1, is designed to help members of school district governing boards establish board policies, regulations, and procedures. Topics…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
... maintenance activities. SGRLPS proposes to transport visitors to the Station during the Sunday work window... two times per year within the proposed work window. Scheduled light maintenance activities would... light. For each emergency repair event, the SGRLPS proposes to conduct a maximum of four flights (two...
40 CFR 53.4 - Applications for reference or equivalent method determinations.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM 2.5 and PM 10-2,5 must be described in sufficient detail, based on the elements described... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...
40 CFR 53.4 - Applications for reference or equivalent method determinations.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM 2.5 and PM 10-2.5 must be described in sufficient detail, based on the elements described... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...
The Ames-Lockheed orbiter processing scheduling system
NASA Technical Reports Server (NTRS)
Zweben, Monte; Gargan, Robert
1991-01-01
A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.
Dutton, Gareth R; Gowey, Marissa A; Tan, Fei; Zhou, Dali; Ard, Jamy; Perri, Michael G; Lewis, Cora E
2017-08-15
Behavioral interventions for obesity produce clinically meaningful weight loss, but weight regain following treatment is common. Extended care programs attenuate weight regain and improve weight loss maintenance. However, less is known about the most effective ways to deliver extended care, including contact schedules. We compared the 12-month weight regain of an extended care program utilizing a non-conventional, clustered campaign treatment schedule and a self-directed program among individuals who previously achieved ≥5% weight reductions. Participants (N = 108; mean age = 51.6 years; mean weight = 92.6 kg; 52% African American; 95% female) who achieved ≥5% weight loss during an initial 16-week behavioral obesity treatment were randomized into a 2-arm, 12-month extended care trial. A clustered campaign condition included 12 group-based visits delivered in three, 4-week clusters. A self-directed condition included provision of the same printed intervention materials but no additional treatment visits. The study was conducted in a U.S. academic medical center from 2011 to 2015. Prior to randomization, participants lost an average of -7.55 ± 3.04 kg. Participants randomized to the 12-month clustered campaign program regained significantly less weight (0.35 ± 4.62 kg) than self-directed participants (2.40 ± 3.99 kg), which represented a significant between-group difference of 2.28 kg (p = 0.0154) after covariate adjustments. This corresponded to maintaining 87% and 64% of lost weight in the clustered campaign and self-directed conditions, respectively, which was a significant between-group difference of 29% maintenance of lost weight after covariate adjustments, p = 0.0396. In this initial test of a clustered campaign treatment schedule, this novel approach effectively promoted 12-month maintenance of lost weight. Future trials should directly compare the clustered campaigns with conventional (e.g., monthly) extended care schedules. Clinicaltrials.gov NCT02487121 . Registered 06/26/2015 (retrospectively registered).
Krauss, Gregory; Biton, Victor; Harvey, Jay H; Elger, Christian; Trinka, Eugen; Soares da Silva, Patrício; Gama, Helena; Cheng, Hailong; Grinnell, Todd; Blum, David
2018-01-01
To examine the influence of titration schedule and maintenance dose on the incidence and type of treatment-emergent adverse events (TEAEs) associated with adjunctive eslicarbazepine acetate (ESL). Data from three randomized, double-blind, placebo-controlled trials were analyzed. Patients with refractory partial-onset seizures were randomized to maintenance doses of ESL 400, 800, or 1200mg QD (dosing was initiated at 400 or 800mg QD) or placebo. The incidence of TEAEs was analyzed during the double-blind period (2-week titration phase; 12-week maintenance phase), according to the randomized maintenance dose and the titration schedule. 1447 patients were included in the analysis. During the first week of treatment, 62% of patients taking ESL 800mg QD had ≥1 TEAE, vs 35% of those taking 400mg QD and 32% of the placebo group; dizziness, somnolence, nausea, and headache were numerically more frequent in patients taking ESL 800mg than those taking ESL 400mg QD. During the double-blind period, the incidences of common TEAEs were lower in patients who initiated ESL at 400mg vs 800mg QD. For the 800 and 1200mg QD maintenance doses, rates of TEAEs leading to discontinuation were lower in patients who began treatment with 400mg than in those who began taking ESL 800mg QD. Initiation of ESL at 800mg QD is feasible. However, initiating treatment with ESL 400mg QD for 1 or 2 weeks is recommended, being associated with a lower incidence of TEAEs, and related discontinuations. For some patients, treatment may be initiated at 800mg QD, if the need for more immediate seizure reduction outweighs concerns about increased risk of adverse reactions during initiation. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.
The impact of roster changes on absenteeism and incident frequency in an Australian coal mine
Baker, A; Heiler, K; Ferguson, S
2003-01-01
Background: The occupational health and safety implications associated with compressed and extended work periods have not been fully explored in the mining sector. Aims: To examine the impact on employee health and safety of changes to the roster system in an Australian coal mine. Methods: Absenteeism and incident frequency rate data were collected over a 33 month period that covered three different roster schedules. Period 1 covered the original 8-hour/7-day roster. Period 2 covered a 12-month period under a 12-hour/7-day schedule, and period 3 covered a 12-month period during which a roster that scheduled shifts only on weekdays, with uncapped overtime on weekends and days off (12-hour/5-day) was in place. Data were collected and analysed from the maintenance, mining, and coal preparation plant (CPP) sectors. Results: The only significant change in absenteeism rates was an increase in the maintenance sector in the third data collection period. Absenteeism rates in the mining and CPP sectors were not different between data collection periods. The increase in the maintenance sector may be owing to: (1) a greater requirement for maintenance employees to perform overtime as a result of the roster change compared to other employee groups; or (2) greater monotony associated with extended work periods for maintenance employees compared to others. After the first roster change, accident incident frequency decreased in the CPP sector but not in the other sectors. There was no effect on incident frequency after the second roster change in any sector. Conclusions: The current study did not find significant negative effects of a 12-hour pattern, when compared to an 8-hour system. However, when unregulated and excessive overtime was introduced as part of the 12-hour/5-day roster, absenteeism rates were increased in the maintenance sector. The combination of excessive work hours and lack of consultation with employees regarding the second change may have contributed to the overall negative effects. PMID:12499456
The Composition of the Master Schedule
NASA Technical Reports Server (NTRS)
Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.
2010-01-01
Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.
Axelrod, David E; Vedula, Sudeepti; Obaniyi, James
2017-05-01
The effectiveness of cancer chemotherapy is limited by intra-tumor heterogeneity, the emergence of spontaneous and induced drug-resistant mutant subclones, and the maximum dose to which normal tissues can be exposed without adverse side effects. The goal of this project was to determine if intermittent schedules of the maximum dose that allows colon crypt maintenance could overcome these limitations, specifically by eliminating mixtures of drug-resistant mutants from heterogeneous early colon adenomas while maintaining colon crypt function. A computer model of cell dynamics in human colon crypts was calibrated with measurements of human biopsy specimens. The model allowed simulation of continuous and intermittent dose schedules of a cytotoxic chemotherapeutic drug, as well as the drug's effect on the elimination of mutant cells and the maintenance of crypt function. Colon crypts can tolerate a tenfold greater intermittent dose than constant dose. This allows elimination of a mixture of relatively drug-sensitive and drug-resistant mutant subclones from heterogeneous colon crypts. Mutants can be eliminated whether they arise spontaneously or are induced by the cytotoxic drug. An intermittent dose, at the maximum that allows colon crypt maintenance, can be effective in eliminating a heterogeneous mixture of mutant subclones before they fill the crypt and form an adenoma.
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2011 CFR
2011-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2012 CFR
2012-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2013 CFR
2013-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2014 CFR
2014-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
40 CFR 53.4 - Applications for reference or equivalent method determinations.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM2.5 and PM10−2.5 must be described in sufficient detail, based on the elements described in... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...
40 CFR 53.4 - Applications for reference or equivalent method determinations.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Required or recommended routine, periodic, and preventative maintenance and maintenance schedules. (J) Any... methods for PM2.5 and PM10−2.5 must be described in sufficient detail, based on the elements described in... Table A-1 to this subpart) will be met throughout the warranty period and that the applicant accepts...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wright, J.L.
1992-06-18
Properly selected and maintained chain drives can be expected to give thousands of hours of reliable service. Selection is usually done just once. This paper reports on good maintenance which must be done regularly to keep the drive operating. An effective maintenance program for roller chain should include correct type and adequate amounts of lubrication, replacement of worn chains and sprockets, and elimination of drive interferences. It is important to set u a lubrication and inspection/correction schedule to ensure that all required maintenance is carried out.
Diagnostics of heavy mining equipment during the scheduled preventive maintenance
NASA Astrophysics Data System (ADS)
Drygin, M. Yu; Kuryshkin, N. P.
2018-01-01
Intensification of production, economic globalization and dramatic downgrade of the workers’ professional skills lead to unacceptable technical state of heavy mining equipment. Equipment maintenance outage reaches 84 % of the total downtime, of which emergency maintenance takes up to 36 % of time, that excesses 429 hours per year fr one excavator. It is shown that yearly diagnostics using methods of non-destructive check allows to reduce emergency downtime by 47 %, and 55 % of revealed defects can be eliminated without breaking the technological cycle of the equipment.
Simulators for Maintenance Training: Some Issues, Problems and Areas for Future Research
1978-07-01
trainer into a full-scale, three-dimensional simulation of one cabinet of the NIKE HIPAR system. Test points for troubleshooting were located on simulated...described was used to teach maintenance of the NIKE HIPAR system. It too was considered to be a general purpose trainer in that its basic features could be...types of maintenance simulators based on a detailed task analysis of the NIKE HIPAR system as it existed one year before it was scheduled to become
A manpower scheduling heuristic for aircraft maintenance application
NASA Astrophysics Data System (ADS)
Sze, San-Nah; Sze, Jeeu-Fong; Chiew, Kang-Leng
2012-09-01
This research studies a manpower scheduling for aircraft maintenance, focusing on in-flight food loading operation. A group of loading teams with flexible shifts is required to deliver and upload packaged meals from the ground kitchen to aircrafts in multiple trips. All aircrafts must be served within predefined time windows. The scheduling process takes into account of various constraints such as meal break allocation, multi-trip traveling and food exposure time limit. Considering the aircrafts movement and predefined maximum working hours for each loading team, the main objective of this study is to form an efficient roster by assigning a minimum number of loading teams to the aircrafts. We proposed an insertion based heuristic to generate the solutions in a short period of time for large instances. This proposed algorithm is implemented in various stages for constructing trips due to the presence of numerous constraints. The robustness and efficiency of the algorithm is demonstrated in computational results. The results show that the insertion heuristic more efficiently outperforms the company's current practice.
Pontes, Caridad; Gratacós, Jordi; Torres, Ferran; Avendaño, Cristina; Sanz, Jesús; Vallano, Antoni; Juanola, Xavier; de Miguel, Eugenio; Sanmartí, Raimon; Calvo, Gonzalo
2015-08-20
Dose reduction schedules of tumor necrosis factor antagonists (anti-TNF) as maintenance therapy in patients with spondyloarthritis are used empirically in clinical practice, despite the lack of clinical trials providing evidence for this practice. To address this issue the Spanish Society of Rheumatology (SER) and Spanish Society of Clinical Pharmacology (SEFC) designed a 3-year multicenter, randomized, open-label, controlled clinical trial (2 years for inclusion and 1 year of follow-up). The study is expected to include 190 patients with axial spondyloarthritis on stable maintenance treatment (≥4 months) with any anti-TNF agent at doses recommended in the summary of product characteristics. Patients will be randomized to either a dose reduction arm or maintenance of the dosing regimen as per the official labelling recommendations. Randomization will be stratified according to the anti-TNF agent received before study inclusion. Patient follow-up, visit schedule, and examinations will be maintained as per normal clinical practice recommendations according to SER guidelines. The study aims to test the hypothesis of noninferiority of the dose reduction strategy compared with standard treatment. The first patients were recruited in July 2012, and study completion is scheduled for the end of April 2015. The REDES-TNF study is a pragmatic clinical trial that aims to provide evidence to support a medical decision now made empirically. The study results may help inform clinical decisions relevant to both patients and healthcare decision makers. EudraCT 2011-005871-18 (21 December 2011).
Soolari, Ahmad
2002-05-01
Periodontal disease is a chronic disease that is perceived by many patients to be nonthreatening. Periodontal therapy has been shown to be less effective if a regular periodontal maintenance schedule is not followed after completion of active therapy. Periodontal maintenance is an integral part of successful periodontal therapy.
Conception of Self-Construction Production Scheduling System
NASA Astrophysics Data System (ADS)
Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru
With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.
Check-off logs for routine equipment maintenance.
Brewster, M A; Carver, P H; Randolph, B
1995-12-01
The regulatory requirement for appropriate routine instrument maintenance documentation is approached by laboratories in numerous ways. Standard operating procedures (SOPs) may refer to maintenance listed in instrument manuals, may indicate "periodic" performance of an action, or may indicate specific tasks to be performed at certain frequencies. The Quality Assurance Unit (QAU) task of assuring the performance of these indicated maintenance tasks can be extremely laborious if these records are merged with other analysis records. Further, the lack of written maintenance schedules often leads to omission of infrequently performed tasks. We recommend creation of routine maintenance check-off logs for instruments with tasks grouped by frequency of expected performance. Usage of such logs should result in better laboratory compliance with SOPs and the compliance can be readily monitored by QAU or by regulatory agencies.
WEST ELEVATION OF USAIR MAINTENANCE HANGAR AT GREATER BUFFALO INTERNATIONAL ...
WEST ELEVATION OF USAIR MAINTENANCE HANGAR AT GREATER BUFFALO INTERNATIONAL AIRPORT. A BOEING 737-200 HAS BEEN TOWED IN FOR AN OVERNIGHT (BALANCE) CHECK. THE TAIL DOCK STANDS ARE IN POSITION AT THE REAR OF THE AIRCRAFT TO FACILITATE INSPECTION. MAINTENANCE CREWS PERFORM NIGHTLY SERVICE ON UP TO 6 AIRCRAFT. THE NORMAL SEQUENCE OF 12 ROUTINE CHECKS COVERS SEVEN BASIC AREAS: INTERIOR, EXTERIOR, WINGS, LANDING GEAR, TAIL, AUXILIARY POWER UNIT (APU), AND ENGINES. THE WORK FORCE CONSISTS OF 5 INSPECTORS, 3 LEAD MECHANICS, AND 24 MECHANICS; NIGHTLY SCHEDULES ARE COORDINATED BY A PLANNER. - Greater Buffalo International Airport, Maintenance Hangar, Buffalo, Erie County, NY
Value centric approaches to the design, operations and maintenance of wind turbines
NASA Astrophysics Data System (ADS)
Khadabadi, Madhur Aravind
Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal maintenance strategy. The contributions of this work are twofold. First, I present a practical approach to wind turbine valuation that takes operating and market conditions into account. This work should therefore be useful to wind farm operators, investors and decision makers. Second, I show how the value of a maintenance scheme can be explicitly assessed for different conditions.
1988-09-01
maintenance programs. They use "a dedicated age exploration technique and actuarial analyses (31:847)" to Justify any changes to programs. RAAF. The...A066593). 8. Coffin, M.D. and C.F. Tiffany. "New Air Force Requirements for Structural Safety, Durability and Life Management," AIAA/ ASME /SAE 16th
Atmospheric Science Data Center
2013-03-08
... Features ASDC's RSS feed with highlights about Earth Science Data at NASA Langley Research Center ASDC Scheduled ... about maintenance About RSS What is RSS? RSS (Really Simple Syndication, or Rich Site Summary) ...
Li, Jun-qing; Pan, Quan-ke; Mao, Kun
2014-01-01
A hybrid algorithm which combines particle swarm optimization (PSO) and iterated local search (ILS) is proposed for solving the hybrid flowshop scheduling (HFS) problem with preventive maintenance (PM) activities. In the proposed algorithm, different crossover operators and mutation operators are investigated. In addition, an efficient multiple insert mutation operator is developed for enhancing the searching ability of the algorithm. Furthermore, an ILS-based local search procedure is embedded in the algorithm to improve the exploitation ability of the proposed algorithm. The detailed experimental parameter for the canonical PSO is tuning. The proposed algorithm is tested on the variation of 77 Carlier and Néron's benchmark problems. Detailed comparisons with the present efficient algorithms, including hGA, ILS, PSO, and IG, verify the efficiency and effectiveness of the proposed algorithm. PMID:24883414
Transmission overhaul estimates for partial and full replacement at repair
NASA Technical Reports Server (NTRS)
Savage, M.; Lewicki, D. G.
1991-01-01
Timely transmission overhauls increase in-flight service reliability greater than the calculated design reliabilities of the individual aircraft transmission components. Although necessary for aircraft safety, transmission overhauls contribute significantly to aircraft expense. Predictions of a transmission's maintenance needs at the design stage should enable the development of more cost effective and reliable transmissions in the future. The frequency is estimated of overhaul along with the number of transmissions or components needed to support the overhaul schedule. Two methods based on the two parameter Weibull statistical distribution for component life are used to estimate the time between transmission overhauls. These methods predict transmission lives for maintenance schedules which repair the transmission with a complete system replacement or repair only failed components of the transmission. An example illustrates the methods.
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Baldwin, John
2007-01-01
TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.
2006-03-01
Requirements for the Degree of Master of Science in Logistics Management Dale L. Overholts II, BS Capt, USAF March 2006 APPROVED...distance (e. g . , travel time or cost, demand satisfaction) is fundamental to such problems” (Current et al, 2002:86). The set covering location... the total number of scheduled launch facilities, can be found in Appendix F. Appendix G provides detailed information regarding the impacts of
FASTER - A tool for DSN forecasting and scheduling
NASA Technical Reports Server (NTRS)
Werntz, David; Loyola, Steven; Zendejas, Silvino
1993-01-01
FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.
ERIC Educational Resources Information Center
Kennedy, Mike
2003-01-01
Describes how facilities-management systems use technology to help schools and universities operate their buildings more efficiently, reduce energy consumption, manage inventory more accurately, keep track of supplies and maintenance schedules, and save money. (EV)
More Bang for the Buck: Integrating Green Infrastructure into Existing Public Works Projects
shares lessons learned from municipal and county officials experienced in coordinating green infrastructure applications with scheduled street maintenance, park improvements, and projects on public sites.
Crew interface specifications preparation for in-flight maintenance and stowage functions
NASA Technical Reports Server (NTRS)
Parker, F. W.; Carlton, B. E.
1972-01-01
The findings and data products developed during the Phase 2 crew interface specification study are presented. Five new NASA general specifications were prepared: operations location coding system for crew interfaces; loose equipment and stowage management requirements; loose equipment and stowage data base information requirements; spacecraft loose equipment stowage drawing requirements; and inflight stowage management data requirements. Additional data was developed defining inflight maintenance processes and related data concepts for inflight troubleshooting, remove/repair/replace and scheduled maintenance activities. The process of maintenance task and equipment definition during spacecraft design and development was also defined and related data concepts were identified for futher development into formal NASA specifications during future follow-on study phases of the contract.
Flight control electronics reliability/maintenance study
NASA Technical Reports Server (NTRS)
Dade, W. W.; Edwards, R. H.; Katt, G. T.; Mcclellan, K. L.; Shomber, H. A.
1977-01-01
Collection and analysis of data are reported that concern the reliability and maintenance experience of flight control system electronics currently in use on passenger carrying jet aircraft. Two airlines B-747 airplane fleets were analyzed to assess the component reliability, system functional reliability, and achieved availability of the CAT II configuration flight control system. Also assessed were the costs generated by this system in the categories of spare equipment, schedule irregularity, and line and shop maintenance. The results indicate that although there is a marked difference in the geographic location and route pattern between the airlines studied, there is a close similarity in the reliability and the maintenance costs associated with the flight control electronics.
24 CFR 886.105 - Content of application; Disclosure.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...
24 CFR 886.105 - Content of application; Disclosure.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...
24 CFR 886.105 - Content of application; Disclosure.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...
24 CFR 886.105 - Content of application; Disclosure.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) For projects having a history of financial default, financial difficulties or deferred maintenance, a plan and a schedule for remedying such defaulted or deferred obligations; (e) Total number of units by...
40 CFR 86.428-80 - Maintenance, scheduled; test vehicles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... necessary. For example, piston and cylinder replacement caused by piston seizure which results in the vehicle being inoperative; or in the case of two-stroke engines, decarbonization, the need for which is...
40 CFR 86.428-80 - Maintenance, scheduled; test vehicles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... necessary. For example, piston and cylinder replacement caused by piston seizure which results in the vehicle being inoperative; or in the case of two-stroke engines, decarbonization, the need for which is...
40 CFR 86.428-80 - Maintenance, scheduled; test vehicles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... necessary. For example, piston and cylinder replacement caused by piston seizure which results in the vehicle being inoperative; or in the case of two-stroke engines, decarbonization, the need for which is...
40 CFR 86.428-80 - Maintenance, scheduled; test vehicles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... necessary. For example, piston and cylinder replacement caused by piston seizure which results in the vehicle being inoperative; or in the case of two-stroke engines, decarbonization, the need for which is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
2016-02-10
The software was created in the process of developing a system known as the Smart Monitoring and Diagnostic System (SMDS) for packaged air conditioners and heat pumps used on commercial buildings (known as RTUs). The SMDS provides automated remote monitoring and detection of performance degradation and faults in these RTUs and could increase the awareness by building owners and maintenance providers of the condition of the equipment, the cost of operating it in degraded condition, and the quality of maintenance and repair service when it is performed. The SMDS provides these capabilities and would enable conditioned-based maintenance rather than themore » reactive and schedule-based preventive maintenance commonly used today, when maintenance of RTUs is done at all. Improved maintenance would help ensure persistent peak operating efficiencies, reducing energy consumption by an estimated 10% to 30%.« less
User interface issues in supporting human-computer integrated scheduling
NASA Technical Reports Server (NTRS)
Cooper, Lynne P.; Biefeld, Eric W.
1991-01-01
Explored here is the user interface problems encountered with the Operations Missions Planner (OMP) project at the Jet Propulsion Laboratory (JPL). OMP uses a unique iterative approach to planning that places additional requirements on the user interface, particularly to support system development and maintenance. These requirements are necessary to support the concepts of heuristically controlled search, in-progress assessment, and iterative refinement of the schedule. The techniques used to address the OMP interface needs are given.
Perspectives on U.S. Competitiveness in Science and Technology
2007-01-01
nation is unlikely to receive some sudden “ wakeup ” call; rather, the problem is one that is likely to evidence itself gradually over a surprisingly...health care than on steel.3 US scheduled airlines currently outsource portions of their aircraft maintenance to China and El Salvador.4 IBM recently sold... schedules based on “duties classification.” This approach reflected the “scientific” management period by formalizing the “rank in position” principle of
Perspectives on U.S. Competitiveness in Science and Technology: Conference Proceedings
2006-11-01
that the nation is unlikely to receive some sudden “ wakeup ” call; rather, the problem is one that is likely to evidence itself gradually over a...on health care than on steel.3 US scheduled airlines currently outsource portions of their aircraft maintenance to China and El Salvador.4 IBM... schedules based on “duties classification.” This approach reflected the “scientific” management period by formalizing the “rank in position
Guidelines for software inspections
NASA Technical Reports Server (NTRS)
1983-01-01
Quality control inspections are software problem finding procedures which provide defect removal as well as improvements in software functionality, maintenance, quality, and development and testing methodology is discussed. The many side benefits include education, documentation, training, and scheduling.
Multi-trip vehicle routing and scheduling problem with time window in real life
NASA Astrophysics Data System (ADS)
Sze, San-Nah; Chiew, Kang-Leng; Sze, Jeeu-Fong
2012-09-01
This paper studies a manpower scheduling problem with multiple maintenance operations and vehicle routing considerations. Service teams located at a common service centre are required to travel to different customer sites. All customers must be served within given time window, which are known in advance. The scheduling process must take into consideration complex constraints such as a meal break during the team's shift, multiple travelling trips, synchronisation of service teams and working shifts. The main objective of this study is to develop a heuristic that can generate high quality solution in short time for large problem instances. A Two-stage Scheduling Heuristic is developed for different variants of the problem. Empirical results show that the proposed solution performs effectively and efficiently. In addition, our proposed approximation algorithm is very flexible and can be easily adapted to different scheduling environments and operational requirements.
The air transportation industry birthplace of reliability-centered maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matteson, T.D.
1996-08-01
The 1980s and 1970s provided a timely opportunity for examining and radically changing the process called {open_quotes}preventive maintenance{close_quotes} as it is applied to the aircraft used for scheduled air transportation. The Federal Aviation Administration and four major airlines, United, American, Pan American and Trans World, were the {open_quotes}principals{close_quotes} in that process. While United`s work with the FAA on the Boeing 737 had opened the door a crack, the Boeing 747 presented a major opportunity to radically improve the process for maintenance program design. That program was guided by the results of United`s analyses of failure data from operations of severalmore » fleets, each larger than 100 aircraft, and the concurrent experience of American, Pan American and Trans World. That knowledge provided the insights necessary to support an entirely different approach to maintenance program design. As a result, while United`s existing maintenance program required scheduled overhaul of 339 items on each DC-8, it required overhaul of only 8 items on the B-7471 Although the initial thrust of that work focused on components of active systems, there was concurrent work focused on items whose principal function was to carry the loads associated with operations. That program focused on the classification of structurally-significant items and their classification as {open_quotes}safe life{close_quotes} or {open_quotes}damage tolerant{close_quote} to determine what periodic replacements or repeated inspections were required. That work came to the attention of the Department of Defense which supported preparation of the book-length report by F. Stanley Nowlan and Howard F. Heap at United Airlines entitled {open_quote}Reliability-Centered maintenance{close_quotes}.« less
NASA Technical Reports Server (NTRS)
Zweben, Monte
1991-01-01
The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
NASA Technical Reports Server (NTRS)
Zweben, Monte
1991-01-01
The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
NASA Technical Reports Server (NTRS)
Zweben, Monte
1993-01-01
The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.
NASA Technical Reports Server (NTRS)
2002-01-01
A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.
1980-11-01
structural manager. The designation "ASIMISH is used in the subsequent discussions to avoid the impression that a new organization must be created to...mission changes on the structural integrity of the airframe. New maintenance action schedules are created to conform with the operational realities of... created to further divide this information. In fact, the ASIP maintenance action parameters and data for the A-7D ( and other airplanes) is being
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... installed as set forth in the watershed or RC&D measure plan. (d) Compliance with the time frames and O&M... the schedule for withdrawal of water in water impounding structures as specified in the watershed or...
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... installed as set forth in the watershed or RC&D measure plan. (d) Compliance with the time frames and O&M... the schedule for withdrawal of water in water impounding structures as specified in the watershed or...
On metaheuristic "failure modes": a case study in Tabu search for job-shop scheduling.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watson, Jean-Paul
2005-06-01
In this paper, we analyze the relationship between pool maintenance schemes, long-term memory mechanisms, and search space structure, with the goal of placing metaheuristic design on a more concrete foundation.
What to Do until the Microprocesser Arrives.
ERIC Educational Resources Information Center
Barzilla, Frank
1983-01-01
Advises administrators how to develop an energy master plan and how to reduce the usage of heating, ventilating, and air conditioning (HVAC) systems by means of a time clock, thermostat, and a scheduled preventive maintenance program. (MLF)
Evapotranspiration-based irrigation scheduling of lettuce and broccoli
USDA-ARS?s Scientific Manuscript database
Estimation of crop evapotranspiration supports efficient irrigation water management, which in turn supports water conservation, mitigation of groundwater depletion/degradation, energy savings, and crop quality maintenance. Past research in California has revealed strong relationships between fract...
A Busy School Year for Spacecraft.
ERIC Educational Resources Information Center
Riddle, Bob
2001-01-01
Discusses the five upcoming shuttle missions, two Russian missions to the International Space Station, a scheduled visit to the Hubble Space Telescope for maintenance, and other events in the solar system. Includes a list of monthly events. (YDS)
Plant Operation: Exterior Maintenance, Work Hours
ERIC Educational Resources Information Center
Nation's Schools and Colleges, 1975
1975-01-01
A pitched roof built over a flat roof prevented leaking at a Vermont school. The University of New Hampshire paint shop has a flexible scheduling system that allows employees to choose their work hours each day. (Author/MLF)
Jin, Junchen
2016-01-01
The shunting schedule of electric multiple units depot (SSED) is one of the essential plans for high-speed train maintenance activities. This paper presents a 0-1 programming model to address the problem of determining an optimal SSED through automatic computing. The objective of the model is to minimize the number of shunting movements and the constraints include track occupation conflicts, shunting routes conflicts, time durations of maintenance processes, and shunting running time. An enhanced particle swarm optimization (EPSO) algorithm is proposed to solve the optimization problem. Finally, an empirical study from Shanghai South EMU Depot is carried out to illustrate the model and EPSO algorithm. The optimization results indicate that the proposed method is valid for the SSED problem and that the EPSO algorithm outperforms the traditional PSO algorithm on the aspect of optimality. PMID:27436998
Plant maintenance and advanced reactors, 2005
DOE Office of Scientific and Technical Information (OSTI.GOV)
Agnihotri, Newal
2005-09-15
The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: First U.S. EPRs in 2015, by Ray Ganthner, Framatome ANP; Pursuing several opportunities, by William E. (Ed) Cummins, Westinghouse Electric Company; Vigorous plans to develop advanced reactors, by Yuliang Sun, Tsinghua University, China; Multiple designs, small and large, by Kumiaki Moriya, Hitachi Ltd., Japan; Sealed and embedded for safety and security, by Handa Norihiko, Toshiba Corporation, Japan; Scheduled online in 2010, by Johan Slabber, PMBR (Pty) Ltd., South Africa; Multi-application reactors, by Nikolay G. Kodochigov, OKBM, Russia; Six projects under budgetmore » and on schedule, by David F. Togerson, AECL, Canada; Creating a positive image, by Scott Peterson, Nuclear Energy Institute (NEI); Advanced plans for nuclear power's renaissance, by John Cleveland, International Atomic Energy Agency, Austria; and, Plant profile: last five outages in less than 20 days, by Beth Rapczynski, Exelon Nuclear.« less
Cryogenics maintenance strategy
NASA Astrophysics Data System (ADS)
Cruzat, Fabiola
2012-09-01
ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.
Prognostics Methodology for Complex Systems
NASA Technical Reports Server (NTRS)
Gulati, Sandeep; Mackey, Ryan
2003-01-01
An automatic method to schedule maintenance and repair of complex systems is produced based on a computational structure called the Informed Maintenance Grid (IMG). This method provides solutions to the two fundamental problems in autonomic logistics: (1) unambiguous detection of deterioration or impending loss of function and (2) determination of the time remaining to perform maintenance or other corrective action based upon information from the system. The IMG provides a health determination over the medium-to-longterm operation of the system, from one or more days to years of study. The IMG is especially applicable to spacecraft and both piloted and autonomous aircraft, or industrial control processes.
The Microcomputer and School Transportation.
ERIC Educational Resources Information Center
Dembowski, Frederick L.
1984-01-01
Microcomputers have many cost- and time-saving uses in school transportation management. Applications include routing and scheduling, demographic analysis, fleet maintenance, and personnel and contract management. Word processing is especially promising for storing and updating documents like specifications. Enrollment forecasting and inventory…
2009-07-01
Comments from the Department of Defense 33 Appendix IV GAO Contact and Staff Acknowledgments 36 Related GAO Products 37 Tables Table...work of the U.S. government and is not subject to copyright protection in the United States. The published product may be reproduced and distributed in...disrupting maintenance production schedules due to personnel transfers since the employees are already experienced in performing these jobs. DLA Has
Enhanced Software for Scheduling Space-Shuttle Processing
NASA Technical Reports Server (NTRS)
Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.;
2004-01-01
The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.
Optimization Models for Scheduling of Jobs
Indika, S. H. Sathish; Shier, Douglas R.
2006-01-01
This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions. PMID:27274921
ERIC Educational Resources Information Center
Lewis, Barbara
1982-01-01
Beginning on the front cover, this article tells how school districts are reducing their transportation costs. Particularly effective measures include the use of computers for bus maintenance and scheduling, school board ownership of buses, and the conversion of gasoline-powered buses to alternative fuels. (Author/MLF)
Study of turboprop systems reliability and maintenance costs
NASA Technical Reports Server (NTRS)
1978-01-01
The overall reliability and maintenance costs (R&MC's) of past and current turboprop systems were examined. Maintenance cost drivers were found to be scheduled overhaul (40%), lack of modularity particularly in the propeller and reduction gearbox, and lack of inherent durability (reliability) of some parts. Comparisons were made between the 501-D13/54H60 turboprop system and the widely used JT8D turbofan. It was found that the total maintenance cost per flight hour of the turboprop was 75% higher than that of the JT8D turbofan. Part of this difference was due to propeller and gearbox costs being higher than those of the fan and reverser, but most of the difference was in the engine core where the older technology turboprop core maintenance costs were nearly 70 percent higher than for the turbofan. The estimated maintenance cost of both the advanced turboprop and advanced turbofan were less than the JT8D. The conclusion was that an advanced turboprop and an advanced turbofan, using similar cores, will have very competitive maintenance costs per flight hour.
Centralized mission planning and scheduling system for the Landsat Data Continuity Mission
Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki
2014-01-01
Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.
Low-Cost Oil Quality Sensor Based on Changes in Complex Permittivity
Pérez, Angel Torres; Hadfield, Mark
2011-01-01
Real time oil quality monitoring techniques help to protect important industry assets, minimize downtime and reduce maintenance costs. The measurement of a lubricant’s complex permittivity is an effective indicator of the oil degradation process and it can be useful in condition based maintenance (CBM) to select the most adequate oil replacement maintenance schedules. A discussion of the working principles of an oil quality sensor based on a marginal oscillator to monitor the losses of the dielectric at high frequencies (>1 MHz) is presented. An electronic design procedure is covered which results in a low cost, effective and ruggedized sensor implementation suitable for use in harsh environments. PMID:22346666
ERIC Educational Resources Information Center
Frank, David J.
1998-01-01
Discusses the creation of an effective carpet vacuuming program by combining area usage assessment and vacuuming requirements with a scheduling plan. Also explains vacuum cleaner suction and filtration and how it makes custodian work more efficient. A complementary article discusses creating an effective floor-maintenance plan for resilient…
41 CFR 109-38.502 - Guidelines.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38-MOTOR EQUIPMENT MANAGEMENT 38.5-Scheduled Maintenance § 109-38.502 Guidelines. ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Guidelines. 109-38.502 Section 109-38.502 Public Contracts and Property Management Federal Property Management Regulations System...
18 CFR 125.3 - Schedule of records and periods of retention.
Code of Federal Regulations, 2010 CFR
2010-04-01
... and agreements. 4. Accountants' and auditors' reports. Information Technology Management 5. Automatic.... Vouchers. Insurance 12. Insurance records. Operations and Maintenance 13.1. Production—Public utilities and licensees (less nuclear). 13.2 Production—Nuclear. 14. Transmission and distribution—Public utilities and...
Kuipers uses vacuum cleaner while performing maintenance in the Columbus Module
2012-02-22
ISS030-E-093398 (22 Feb. 2012) --- European Space Agency astronaut Andre Kuipers, Expedition 30 flight engineer, uses a vacuum cleaner while performing the scheduled extensive cleanup of ventilation systems in the Columbus laboratory of the International Space Station.
DOT National Transportation Integrated Search
1984-07-01
Rail descriptive and defect occurrence information from the Burlington Northern and Atchison, Topeka and Santa Fe railroads is given and analyzed. Track data includes information on track type, when laid, maintenance schedules, etc.
40 CFR 243.204-2 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... collection system. These records should be used for scheduling maintenance and replacement, for budgeting, and for system evaluation and comparison. (b) The collection system should be reviewed on a regular...) SOLID WASTES GUIDELINES FOR THE STORAGE AND COLLECTION OF RESIDENTIAL, COMMERCIAL, AND INSTITUTIONAL...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, J.S.
Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less
The Offering, Scheduling and Maintenance of Elective Advanced Pharmacy Practice Experiences
Brown, Rex O.; Patel, Zalak V.; Foster, Stephan L.
2015-01-01
The Accreditation Council for Pharmacy Education (ACPE) provides standards for colleges of pharmacy to assist in the provision of pharmacy education to student pharmacists. An integral part of all college educational programs includes the provision of experiential learning. Experiential learning allows students to gain real-world experience in direct patient care during completion of the curriculum. All college of pharmacy programs provide several Advanced Pharmacy Practice Experiences (APPEs), which include a balance between the four required experiences and a number of other required or elective APPEs. Required APPEs include advanced community, advanced institutional, ambulatory care, and general medicine. The elective APPEs include a myriad of opportunities to help provide a balanced education in experiential learning for student pharmacists. These unique opportunities help to expose student pharmacists to different career tracks that they may not have been able to experience otherwise. Not all colleges offer enough elective APPEs to enable the student pharmacist to obtain experiences in a defined area. Such an approach is required to produce skilled pharmacy graduates that are capable to enter practice in various settings. Elective APPEs are scheduled logically and are based upon student career interest and site availability. This article describes the offering, scheduling and maintenance of different elective APPEs offered by The University of Tennessee College of Pharmacy. PMID:28975920
The Use of Megestrol Acetate in Some Feline Dermatological Problems
Gosselin, Y.; Chalifoux, A.; Papageorges, M.
1981-01-01
Twenty-one cats were treated with megestrol acetate because they were showing clinical signs associated with one of the following problems: eosinophilic ulcer, eosinophilic plaque, neurodermatitis, endocrine alopecia and miliary dermatitis. The dosage schedule was 5 mg orally per day per cat for seven days, then 5 mg every three days for 21 days. In all cats, we noted a good improvement of the lesions as soon as treatment was started. In 25% of the patients, one treatment schedule was sufficient to control the skin disease for at least 18 months. In the remaining 75%, two treatment schedules and/or a maintenance dosage had to be established. Side effects encountered were increased appetite, personality changes and depression. PMID:7337916
Automated Platform Management System Scheduling
NASA Technical Reports Server (NTRS)
Hull, Larry G.
1990-01-01
The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.
A B-52H, tail number 61-0025, arrives at NASA's Dryden Flight Research Center after landing July 30,
NASA Technical Reports Server (NTRS)
2001-01-01
NASA Dryden Flight Research Center, Edwards, California, received an 'H' model B-52 Stratofortress aircraft on July 30, 2001. The B-52H will be used as an air-launch aircraft supporting NASA's flight research and advanced technology demonstration efforts. Dryden received the B-52H from the U.S. Air Force's (USAF) 23rd Bomb Squadron, 5th Bombardment Wing (Air Combat Command), located at Minot AFB, N.D. A USAF crew flew the aircraft to Dryden. The aircraft, USAF tail number 61-0025, will be loaned initially, then later transferred from the USAF to NASA. The B-52H is scheduled to leave Dryden Aug. 2 for de-militarization and Programmed Depot Maintenance (PDM) at Tinker Air Force Base (AFB), Oklahoma. The depot-level maintenance is scheduled to last about six months and includes a thorough maintenance and inspection process. The newly arrived B-52H is slated to replace Dryden's famous B-52B '008,' in the 2003-2004 timeframe. It will take about one year for the B-52H to be ready for flight research duties. This time includes PDM, construction of the new pylon, installation of the flight research instrumentation equipment, and aircraft envelope clearance flights.
A B-52H, on loan to NASA's Dryden Flight Research Center, makes a pass down the runway prior to land
NASA Technical Reports Server (NTRS)
2001-01-01
NASA Dryden Flight Research Center, Edwards, California, received an 'H' model B-52 Stratofortress aircraft on July 30, 2001. The B-52H will be used as an air-launch aircraft supporting NASA's flight research and advanced technology demonstration efforts. Dryden received the B-52H from the U.S. Air Force's (USAF) 23rd Bomb Squadron, 5th Bombardment Wing (Air Combat Command), located at Minot AFB, N.D. A USAF crew flew the aircraft to Dryden. The aircraft, USAF tail number 61-0025, will be loaned initially, then later transferred from the USAF to NASA. The B-52H is scheduled to leave Dryden Aug. 2 for de-militarization and Programmed Depot Maintenance (PDM) at Tinker Air Force Base (AFB), Oklahoma. The depot-level maintenance is scheduled to last about six months and includes a thorough maintenance and inspection process. The newly arrived B-52H is slated to replace Dryden's famous B-52B '008,' in the 2003-2004 timeframe. It will take about one year for the B-52H to be ready for flight research duties. This time includes PDM, construction of the new pylon, installation of the flight research instrumentation equipment, and aircraft envelope clearance flights.
Guidelines to Language Teaching in Classroom and Laboratory.
ERIC Educational Resources Information Center
Iodice, Don R.
Guidelines for evaluating, establishing, and administrating classroom and laboratory language programs are offered in this report. Attention is focused on the language laboratory, with sections on its use, scheduling, materials and texts, preparation of audio materials, preparation of tests, supervision, discipline, and maintenance. Briefer…
76 FR 10233 - Schedule of Water Charges
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
..., operation, maintenance, replacement, reserves and associated administrative costs.'' Id., par. A.2.b. The...'s Beltzville and Blue Marsh reservoirs. The rates established in 1978--$60 per million gallons for... reference, Water resources, Water reservoirs, Water supply, Watersheds. For the reasons set forth in the...
Reusable Rocket Engine Operability Modeling and Analysis
NASA Technical Reports Server (NTRS)
Christenson, R. L.; Komar, D. R.
1998-01-01
This paper describes the methodology, model, input data, and analysis results of a reusable launch vehicle engine operability study conducted with the goal of supporting design from an operations perspective. Paralleling performance analyses in schedule and method, this requires the use of metrics in a validated operations model useful for design, sensitivity, and trade studies. Operations analysis in this view is one of several design functions. An operations concept was developed given an engine concept and the predicted operations and maintenance processes incorporated into simulation models. Historical operations data at a level of detail suitable to model objectives were collected, analyzed, and formatted for use with the models, the simulations were run, and results collected and presented. The input data used included scheduled and unscheduled timeline and resource information collected into a Space Transportation System (STS) Space Shuttle Main Engine (SSME) historical launch operations database. Results reflect upon the importance not only of reliable hardware but upon operations and corrective maintenance process improvements.
Pharmacokinetics of metronomic chemotherapy: a neglected but crucial aspect.
Bocci, Guido; Kerbel, Robert S
2016-11-01
Metronomic chemotherapy describes the close, regular administration of chemotherapy drugs at less-toxic doses over prolonged periods of time. In 2015, the results of randomized phase III clinical trials demonstrated encouraging, albeit limited, efficacy benefits of metronomic chemotherapy regimens administered as adjuvant maintenance therapy for the treatment of breast cancer, or as maintenance therapy in combination with an antiangiogenic agent for metastatic colorectal cancer. Owing to the investigational nature of this approach, metronomic chemotherapy regimens are highly empirical in terms of the optimal dose and schedule for the drugs administered; therefore, greater knowledge of the pharmacokinetics of metronomic chemotherapy is critical to the future success of this treatment strategy. Unfortunately, such preclinical and clinical pharmacokinetic studies are rare. Herein, we present situations in which active drug concentrations have been achieved with metronomic schedules, and discuss their associated pharmacokinetic parameters. We summarize examples from the limited number of clinical studies in order to illustrate the importance of assessing such pharmacokinetic parameters, and discuss the influence this information can have on improving efficacy and reducing toxicity.
NASA Astrophysics Data System (ADS)
Louzon, E.
1989-12-01
Quality, cost, and schedule are three factors affecting the competitiveness of a company; they require balancing so that products of acceptable quality are delivered, on time and at a competitive cost. Quality costs comprise investment in quality maintenance and failure costs which arise from failure to maintain standards. The basic principle for achieving the required quality at minimum cost is that of prevention of failures, etc., through production control, attention to manufacturing practices, and appropriate management and training. Total quality control involves attention to the product throughout its life cycle, including in-service performance evaluation, servicing, and maintenance.
NASA Technical Reports Server (NTRS)
Hazelton, Lyman R., Jr.
1990-01-01
Some of the logical components of a rule based planning and scheduling system are described. The researcher points out a deficiency in the conventional truth maintenance approach to this class of problems and suggests a new mechanism which overcomes the problem. This extension of the idea of justification truth maintenance may seem at first to be a small philosophical step. However, it embodies a process of basic human reasoning which is so common and automatic as to escape conscious detection without careful introspection. It is vital to any successful implementation of a rule based planning reasoner.
NASA Astrophysics Data System (ADS)
Schoess, Jeffrey N.; Seifert, Greg; Paul, Clare A.
1996-05-01
The smart aircraft fastener evaluation (SAFE) system is an advanced structural health monitoring effort to detect and characterize corrosion in hidden and inaccessible locations of aircraft structures. Hidden corrosion is the number one logistics problem for the U.S. Air Force, with an estimated maintenance cost of $700M per year in 1990 dollars. The SAFE system incorporates a solid-state electrochemical microsensor and smart sensor electronics in the body of a Hi-Lok aircraft fastener to process and autonomously report corrosion status to aircraft maintenance personnel. The long-term payoff for using SAFE technology will be in predictive maintenance for aging aircraft and rotorcraft systems, fugitive emissions applications such as control valves, chemical pipeline vessels, and industrial boilers. Predictive maintenance capability, service, and repair will replace the current practice of scheduled maintenance to substantially reduce operational costs. A summary of the SAFE concept, laboratory test results, and future field test plans is presented.
A case study of machinery maintenance protocols and procedures within the UK utilities sector.
Edwards, David J; Love, Peter E D
2016-08-01
Failure to conduct periodic fixed-time-to (or scheduled) maintenance on off-highway plant and equipment represents a significant health and safety hazard and major litigation risk for utility contractors completing service excavation and reinstatement works on public highways. Mini-excavators are a ubiquitous mobile plant item used for such tasks and have recently been responsible for several major injuries and fatalities involving workers and members of the public in the United Kingdom (UK). The research utilises the method of triangulation to examine the maintenance practices of utility contractors in the UK. Findings from the research reveal that a combination of prevailing market forces and internal 'company' pressures have inadvertently removed knowledgeable and trained operators, site foremen and managerial supervisors from hands-on maintenance inspections. Rather, 'virtual' maintenance protocols and procedures are adopted by head office but rarely fully implemented on-site. The research concludes with pragmatic recommendations and direction for future research. Copyright © 2015 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMaster, B.W.; Jones, S.B.; Sitzler, J.L.
1995-06-01
This document is a compendium of results of the calendar year 1994 Monitor Well Inspection and Maintenance Program at the Department of Energy Y-12 Plant in Oak Ridge, Tennessee. This report documents the work relating to well inspections and maintenance requests. Inspections are implemented in order to better assess the condition and maintenance needs of wells that are actively being monitored. Currently this approach calls for inspecting all wells on a routine (annual or triennial) basis which are: (1) in an active sampling program; (2) included in a hydrologic study; or (3) not in service, but not scheduled for pluggingmore » and abandonment. Routine inspections help to ensure that representative groundwater samples and hydrologic data are being collected, and contribute to the life expectancy of each well. This report formally presents well inspection and maintenance activities that were conducted at the Y-12 Plant during 1994. All inspections were conducted between April and December.« less
Maintenance treatment of recurrent ovarian cancer: Is it ready for prime time?
DiSilvestro, Paul; Alvarez Secord, Angeles
2018-06-05
Approximately 1% of women in the United States will be diagnosed with epithelial ovarian cancer (EOC) during their lifetime. It is most likely to present at a more advanced stage, requiring aggressive therapeutic measures, and most women will succumb to this illness. Due to advancements in therapy, the oncology community has begun to shift its focus to molecular targeted agents, alternative dosing schedules, and maintenance therapy. Women who achieve a response to initial adjuvant chemotherapy may be candidates for maintenance therapy, with the goal of inducing a lasting remission or prolonging the disease-free interval before recurrence. The rationale for maintenance therapy is to delay disease progression by eliminating residual, slowly-dying cancerous cells, or impeding cell turnover. This review discusses the goals of maintenance therapy for EOC with antiangiogenic agents or poly(adenosine diphosphate-ribose) polymerase (PARP) inhibitors, and reviews clinical studies that have demonstrated improvements in survival outcomes. The side-effect profiles for PARP inhibitors and the implications for preserving quality of life during maintenance therapy will also be discussed. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.
Tanaka, Yoshiya; Yamamoto, Kazuhiko; Takeuchi, Tsutomu; Yamanaka, Hisashi; Ishiguro, Naoki; Eguchi, Katsumi; Watanabe, Akira; Origasa, Hideki; Shoji, Toshiharu; Miyasaka, Nobuyuki; Koike, Takao
2014-01-01
Abstract Objectives. To evaluate the long-term efficacy and safety of certolizumab pegol (CZP) plus methotrexate treatment and to assess the efficacy of two CZP maintenance dosing schedules in Japanese rheumatoid arthritis (RA) patients with an inadequate response to methotrexate. Methods. J-RAPID double-blind patients were entered into an open-label extension (OLE) study. Patients withdrawn due to lack of efficacy at 16 weeks and double-blind completers without a week-24 American College of Rheumatology (ACR) 20 response received CZP 200 mg every other week (Q2W) plus methotrexate. Double-blind completers with week-24 ACR20 responses were randomized to CZP 200 mg Q2W plus methotrexate or CZP 400 mg every 4 weeks plus methotrexate. Results. The ACR20/ACR50/ACR70 response rates of double-blind completers (n = 204) were 89.7%/67.2%/36.3% at OLE entry and 95.6%/84.8%/58.3% at 52 weeks, respectively. Other clinical, functional and radiographic outcomes were sustained with long-term CZP plus methotrexate. Long-term treatment with CZP was well-tolerated with no new unexpected adverse events observed. The efficacy and safety of CZP treatment were similar between the two dosing schedules. Conclusions. Continued CZP administration with methotrexate maintained efficacy over 52 weeks and was well-tolerated for Japanese RA patients. No obvious differences in clinical efficacy and safety were observed between the two dosing schedules, giving flexibility in maintenance administration schedules. PMID:24593170
78 FR 43766 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... Boeing Commercial Airplanes, Attention: Data & Services Management, P.O. Box 3707, MC 2H-65, Seattle, WA... fleet availability or span-time of the planned scheduled maintenance check. Conclusion We reviewed the..., at the applicable time specified in paragraph 1.E., ``Compliance,'' of Boeing Special Attention...
38 CFR 4.130 - Schedule of ratings-mental disorders.
Code of Federal Regulations, 2010 CFR
2010-07-01
...; impairment of short- and long-term memory (e.g., retention of only highly learned material, forgetting to... (including maintenance of minimal personal hygiene); disorientation to time or place; memory loss for names... or less often), chronic sleep impairment, mild memory loss (such as forgetting names, directions...
Surveying School Facilities Needs.
ERIC Educational Resources Information Center
Weichel, Harry J.; Dennell, James
1990-01-01
Ralston (Nebraska) Public School District's communitywide survey helped set school facilities priorities while keeping the district's finite resources firmly in mind. With an outline of maintenance costs for the next 10 years, the district can develop a strategic construction schedule. The board also has the option of financing projects through a…
Seeing Red Over Those Black Marks on Your Floors?
ERIC Educational Resources Information Center
Rittner-Heir, Robbin
1999-01-01
Describes one custodian's cost-effective approach for resolving black scuff marks on flooring and staving off their return. An eight-step cleaning program is detailed. Cautions that the largest obstacle to proper handling of floor problems lies in the lack of a proper maintenance schedule. (GR)
NASA occupational medicine programs: Our obligation to management
NASA Technical Reports Server (NTRS)
Arnoldt, L. B.; Mockbee, J.
1975-01-01
Factors to be considered in forming policies for managing NASA's health maintenance program to provide optimum arrangement for quality medical care are discussed. Topics include scheduling routine physical examinations, job related stress, prevalence of chronic diseases, additions to the PROM data system, and disease trends among personnel.
32 CFR 326.5 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Information Officer (CIO), NRO: (1) Ensures that NRO systems of records databases have procedures to protect... law or Executive Order which provides authority for the maintenance of information in each system of... length of time each item of information must be retained according to the NRO Records Control Schedule as...
75 FR 4632 - Advisory Committee on Disability Compensation; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation; Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on February 22-23, 2010, in... Veterans Affairs on the maintenance and periodic readjustment of the VA Schedule for Rating Disabilities...
76 FR 64429 - Advisory Committee on Disability Compensation; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation; Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on November 14-15, 2011, at... the maintenance and periodic readjustment of the VA Schedule for Rating Disabilities. The Committee is...
76 FR 27387 - Advisory Committee on Disability Compensation; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-11
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation; Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on Tuesday, June 21, 2011... the maintenance and periodic readjustment of the VA Schedule for Rating Disabilities. The Committee is...
United States Marine Corps Motor Transport Mechanic-to-Equipment Ratio
time motor transport equipment remains in maintenance at the organizational command level. This thesis uses a discrete event simulation model of the...applied to a single experiment that allows for assessment of risk of not achieving the objective. Inter-arrival time, processing time, work schedule
Evaluation of the use of rubber-tire rollers on asphalt concrete.
DOT National Transportation Integrated Search
1989-01-01
The addition of a rubber-tire roller was required on two projects on maintenance schedules and on two construction projects in 1988. The rubber-tire roller was used as an addition to the conventional rollers on one-half of each project. The rubber-ti...
Custodial Methods and Procedures Manual. Third Edition.
ERIC Educational Resources Information Center
Johnson, Donald R.
This manual discusses school facility cleaning and maintenance from the expanded perspective of work management, physical assets management, and resource management. Work management encompasses the organization of work and personnel, scheduling of daily or routine duties and tasks, and handling of demand work. Physical asset management includes…
Enhancement of LEEDS Decision Tools for E-Craft
2012-03-13
software tool was conducted to determine how to best incorporate RCM into the FMEA process already a part of LEEDS. Plans were made to enhance the...as opposed to implementing a strictly scheduled and costly equipment maintenance program. Utilizing the FMEA process already a part of LEEDS
ECS: efficient communication scheduling for underwater sensor networks.
Hong, Lu; Hong, Feng; Guo, Zhongwen; Li, Zhengbao
2011-01-01
TDMA protocols have attracted a lot of attention for underwater acoustic sensor networks (UWSNs), because of the unique characteristics of acoustic signal propagation such as great energy consumption in transmission, long propagation delay and long communication range. Previous TDMA protocols all allocated transmission time to nodes based on discrete time slots. This paper proposes an efficient continuous time scheduling TDMA protocol (ECS) for UWSNs, including the continuous time based and sender oriented conflict analysis model, the transmission moment allocation algorithm and the distributed topology maintenance algorithm. Simulation results confirm that ECS improves network throughput by 20% on average, compared to existing MAC protocols.
Zero-gravity atmospheric Cloud Physics Experiment Laboratory; Programmatics report
NASA Technical Reports Server (NTRS)
1974-01-01
The programmatics effort included comprehensive analyses in four major areas: (1) work breakdown structure, (2) schedules, (3) costs, and (4) supporting research and technology. These analyses are discussed in detail in the following sections which identify and define the laboratory project development schedule, cost estimates, funding distributions and supporting research and technology requirements. All programmatics analyses are correlated among themselves and with the technical analyses by means of the work breakdown structure which serves as a common framework for program definition. In addition, the programmatic analyses reflect the results of analyses and plans for reliability, safety, test, and maintenance and refurbishment.
78 FR 1728 - Airworthiness Directives; Thielert Aircraft Engines GmbH Reciprocating Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-09
... scheduled maintenance, whichever occurs first, do the following. (1) Remove the oil filler plug and check... Airworthiness Directives; Thielert Aircraft Engines GmbH Reciprocating Engines AGENCY: Federal Aviation... all Thielert Aircraft Engines GmbH (TAE) TAE 125-02-99 and TAE 125-02-114 reciprocating engines. This...
76 FR 35978 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-21
... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate scheduled maintenance at... the Connecticut River at mile 3.4, at Old Lyme, Connecticut, has a vertical clearance in the closed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... is not publicly available, i.e., Confidential Business Information or other information whose... to schedule your inspection. The Regional Office's official hours of business are Monday through... Administrators, Regions I-X, regarding Policy on Excess Emissions During Startup, Shutdown, Maintenance, and...
14 CFR Section 24 - Profit and Loss Elements
Code of Federal Regulations, 2014 CFR
2014-01-01
... Maintenance Burden” shall reflect a memorandum allocation by each air carrier of the total expenses included... operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall include all... line 5 of this schedule. (f) “Operating Profit (Loss)” shall be computed by subtracting the total...
14 CFR Section 24 - Profit and Loss Elements
Code of Federal Regulations, 2013 CFR
2013-01-01
... Maintenance Burden” shall reflect a memorandum allocation by each air carrier of the total expenses included... operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall include all... line 5 of this schedule. (f) “Operating Profit (Loss)” shall be computed by subtracting the total...
14 CFR Section 24 - Profit and Loss Elements
Code of Federal Regulations, 2011 CFR
2011-01-01
... Maintenance Burden” shall reflect a memorandum allocation by each air carrier of the total expenses included... operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall include all... line 5 of this schedule. (f) “Operating Profit (Loss)” shall be computed by subtracting the total...
Asphalt Raking. Instructor Manual. Trainee Manual.
ERIC Educational Resources Information Center
Laborers-AGC Education and Training Fund, Pomfret Center, CT.
This packet consists of the instructor and trainee manuals for an asphalt raking course. The instructor manual contains a course schedule for 4 days of instruction, content outline, and instructor outline. The trainee manual is divided into five sections: safety, asphalt basics, placing methods, repair and patching, and clean-up and maintenance.…
ERIC Educational Resources Information Center
Ward, James E.
1976-01-01
A course in building maintenance (at the Voc Tech Department of Pensacola Junior College, Florida) teaches students to maintain, repair, and rework existing facilities under the CETA program. The daily schedule includes one hour of classroom work covering related academic subjects and five hours spent working on a variety of projects. (LH)
40 CFR 1054.125 - What maintenance instructions must I give to buyers?
Code of Federal Regulations, 2011 CFR
2011-07-01
... schedule cleaning or changing air filters or changing spark plugs at the least frequent interval described... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND... aftertreatment devices, pulse-air valves, fuel injectors, oxygen sensors, electronic control units, superchargers...
40 CFR 1054.125 - What maintenance instructions must I give to buyers?
Code of Federal Regulations, 2010 CFR
2010-07-01
... schedule cleaning or changing air filters or changing spark plugs at the least frequent interval described... (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND... aftertreatment devices, pulse-air valves, fuel injectors, oxygen sensors, electronic control units, superchargers...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2013 CFR
2013-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2012 CFR
2012-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2011 CFR
2011-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... Subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
10 CFR Appendix B to Part 436 - Goal Setting Methodology
Code of Federal Regulations, 2014 CFR
2014-01-01
... investment program, (using where appropriate, the life cycle costing factors and methodology in subpart A of... subpart A, the dollars saved can be projected against the dollars invested. Life cycle costing methodology..., maintenance, and equipment acquisition; and phase-out schedule (of older equipment or plants which may be...
41 CFR 109-38.502-50 - DOE guidelines.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.5-Scheduled Maintenance § 109-38.502-50 DOE... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false DOE guidelines. 109-38.502-50 Section 109-38.502-50 Public Contracts and Property Management Federal Property Management...
41 CFR 102-34.280 - What State inspections must we have for Government motor vehicles?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE MANAGEMENT Scheduled Maintenance of Motor Vehicles § 102-34.280 What State... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What State inspections...
18 CFR 300.11 - Technical support for the rate schedule.
Code of Federal Regulations, 2011 CFR
2011-04-01
... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...
18 CFR 300.11 - Technical support for the rate schedule.
Code of Federal Regulations, 2010 CFR
2010-04-01
... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...
18 CFR 300.11 - Technical support for the rate schedule.
Code of Federal Regulations, 2014 CFR
2014-04-01
... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...
18 CFR 300.11 - Technical support for the rate schedule.
Code of Federal Regulations, 2012 CFR
2012-04-01
... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...
18 CFR 300.11 - Technical support for the rate schedule.
Code of Federal Regulations, 2013 CFR
2013-04-01
... historic period or are expected to produce revenue during the rate test period; (B) Capitalized deferred...) Whether the investment is an initial investment, an addition, a replacement, or a capitalized deferred..., Maintenance and Other Annual Expenses. Statement E must contain, for the last five years of the historic...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-05
... and engine manufacturers began planning to meet those requirements by optimizing engine designs for low emissions and adding high-efficiency aftertreatment systems. Manufacturers examined the use of... recirculation, and selective catalytic reduction (SCR). SCR systems use a nitrogen-containing reducing agent...
42 CFR 417.480 - Maintenance of records: Cost HMOs and CMPs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... or CMP, and operation of the HMO's or CMP's financial, medical, and other recordkeeping systems. (2..., sale, or other action. (5) Agreements, contracts, and subcontracts. (6) Franchise, marketing, and management agreements. (7) Schedules of charges for the HMO's or CMP's fee-for-service patients. (8) Matters...
76 FR 79273 - Advisory Committee on Disability Compensation; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation; Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on January 23-24, 2012, at... maintenance and periodic readjustment of the VA Schedule for Rating Disabilities. The Committee is to assemble...
77 FR 55269 - Advisory Committee on Disability Compensation, Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation, Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on September 17-18, 2012, at... maintenance and periodic readjustment of the VA Schedule for Rating Disabilities. The Committee is to assemble...
76 FR 53169 - Advisory Committee on Disability Compensation; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation; Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on September 12-13, 2011, at... maintenance and periodic readjustment of the VA Schedule for Rating Disabilities. The Committee is to assemble...
76 FR 17999 - Advisory Committee on Disability Compensation; Notice of Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... DEPARTMENT OF VETERANS AFFAIRS Advisory Committee on Disability Compensation; Notice of Meeting... Committee Act) that the Advisory Committee on Disability Compensation will meet on April 18-19, 2011, at the... maintenance and periodic readjustment of the VA Schedule for Rating Disabilities. The Committee is to assemble...
76 FR 19911 - Drawbridge Operation Regulation; Calcasieu River, Westlake, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... maintenance and updates to the bridge's operating system. This deviation allows the bridge to remain closed to...'s operating system while minimizing the exposure of personnel to hazards associated with performing... deviation from the operating schedule for the swing span bridge across the Calcasieu River, mile 36.4, at...
40 CFR 86.004-25 - Maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... either emission-related or non-emission-related and each of these can be classified as either scheduled... component whose sole or primary purpose is to reduce emissions or whose failure will significantly degrade emissions control and whose function is not integral to the design and performance of the engine.) (iv) For...
40 CFR 86.004-25 - Maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... either emission-related or non-emission-related and each of these can be classified as either scheduled... component whose sole or primary purpose is to reduce emissions or whose failure will significantly degrade emissions control and whose function is not integral to the design and performance of the engine.) (iv...
Performance-based maintenance of gas turbines for reliable control of degraded power systems
NASA Astrophysics Data System (ADS)
Mo, Huadong; Sansavini, Giovanni; Xie, Min
2018-03-01
Maintenance actions are necessary for ensuring proper operations of control systems under component degradation. However, current condition-based maintenance (CBM) models based on component health indices are not suitable for degraded control systems. Indeed, failures of control systems are only determined by the controller outputs, and the feedback mechanism compensates the control performance loss caused by the component deterioration. Thus, control systems may still operate normally even if the component health indices exceed failure thresholds. This work investigates the CBM model of control systems and employs the reduced control performance as a direct degradation measure for deciding maintenance activities. The reduced control performance depends on the underlying component degradation modelled as a Wiener process and the feedback mechanism. To this aim, the controller features are quantified by developing a dynamic and stochastic control block diagram-based simulation model, consisting of the degraded components and the control mechanism. At each inspection, the system receives a maintenance action if the control performance deterioration exceeds its preventive-maintenance or failure thresholds. Inspired by realistic cases, the component degradation model considers random start time and unit-to-unit variability. The cost analysis of maintenance model is conducted via Monte Carlo simulation. Optimal maintenance strategies are investigated to minimize the expected maintenance costs, which is a direct consequence of the control performance. The proposed framework is able to design preventive maintenance actions on a gas power plant, to ensuring required load frequency control performance against a sudden load increase. The optimization results identify the trade-off between system downtime and maintenance costs as a function of preventive maintenance thresholds and inspection frequency. Finally, the control performance-based maintenance model can reduce maintenance costs as compared to CBM and pre-scheduled maintenance.
Research requirements for development of regenerative engines for helicopters
DOE Office of Scientific and Technical Information (OSTI.GOV)
Semple, R.D.
1976-12-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
Research requirements for development of regenerative engines for helicopters
NASA Technical Reports Server (NTRS)
Semple, R. D.
1976-01-01
The improved specific fuel consumption of the regenerative engine was compared to a simple-cycle turboshaft engine. The performance improvement and fuel saving are obtained at the expense of increased engine weight, development and production costs, and maintenance costs. Costs and schedules are estimated for the elements of the research and development program. Interaction of the regenerative engine with other technology goals for an advanced civil helicopter is examined, including its impact on engine noise, hover and cruise performance, helicopter empty weight, drive-system efficiency and weight, one-engine-inoperative hover capability, and maintenance and reliability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Easton, C. R.
The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less
Psychological health maintenance on Space Station Freedom
NASA Technical Reports Server (NTRS)
Santy, Patricia A.
1990-01-01
The scheduling of crew rotations at intervals of as much as 180 days on NASA's Space Station Freedom entails that the cumulative effects of psychological, emotional, and social stressors on astronauts be monitored. The Space Station's Health Maintenance Facility (HMF) will furnish preventive, diagnostic, and therapeutic assistance for significant psychiatric and interpersonal problems. Mental health professionals must be part of the team of medical personnel charged with facilitating the physiological and phychological transition from earth to space and back. An account is presently given of the critical factors to be addressed by HMF personnel on extended-duration missions.
40 CFR 1042.840 - Application requirements for remanufactured engines.
Code of Federal Regulations, 2011 CFR
2011-07-01
... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the... as described in the application (including the test procedures, test parameters, and test fuels) to... other basic parameters of the engine's design and emission controls. List the fuel type on which your...
40 CFR 1042.840 - Application requirements for remanufactured engines.
Code of Federal Regulations, 2010 CFR
2010-07-01
... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the... as described in the application (including the test procedures, test parameters, and test fuels) to... other basic parameters of the engine's design and emission controls. List the fuel type on which your...
40 CFR 1042.840 - Application requirements for remanufactured engines.
Code of Federal Regulations, 2014 CFR
2014-07-01
... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the... as described in the application (including the test procedures, test parameters, and test fuels) to... other basic parameters of the engine's design and emission controls. List the fuel type on which your...
Code of Federal Regulations, 2011 CFR
2011-01-01
... conducted more frequently if warranted. End QPS Requirements Begin Information g. An example of a segment..., scheduling and conducting tests or inspections, functional preflight checks) but retain the responsibility... following: (a) A maintenance facility that provides suitable FSTD hardware and software tests and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... conducted more frequently if warranted. End QPS Requirements Begin Information g. An example of a segment..., scheduling and conducting tests or inspections, functional preflight checks) but retain the responsibility... following: (a) A maintenance facility that provides suitable FSTD hardware and software tests and...
78 FR 9814 - Drawbridge Operating Regulations; Gulf Intracoastal Waterway, Belle Chasse, LA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-0031] Drawbridge... Louisiana State Route 23 (LA 23) vertical lift span bridge, also known as the Judge Perez Bridge, across the... consecutive days starting February 23, 2013, in order to perform scheduled maintenance. DATES: This deviation...
Estimating allowable-cut by area-scheduling
William B. Leak
2011-01-01
Estimation of the regulated allowable-cut is an important step in placing a forest property under management and ensuring a continued supply of timber over time. Regular harvests also provide for the maintenance of needed wildlife habitat. There are two basic approaches: (1) volume, and (2) area/volume regulation, with many variations of each. Some require...
Policy Manual for a Computerized Search Service in an Academic Library.
ERIC Educational Resources Information Center
Jackson, William J.
This proposed policy manual for the computerized information retrieval service of the University of Houston System outlines policies for specific elements of its operation: (1) users--who is/is not eligible for service and for equipment use; (2) cost--rates charged; (3) responsibilities of searchers--maintenance of searching skills, scheduling of…
Sanitary, Safe and Green School Restrooms
ERIC Educational Resources Information Center
Kennedy, Mike
2011-01-01
The restroom, and what goes on in there, are subjects that cause many people discomfort or embarrassment. However, washrooms do not always receive the attention they require. Their design may be an afterthought. Cleaning and maintenance schedules may not be sufficient to get rid of grime and unpleasant odors. In schools, where hundreds of students…
78 FR 44881 - Drawbridge Operation Regulation; York River, Between Yorktown and Gloucester Point, VA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-25
... deviation from the operating schedule that governs the operation of the Coleman Memorial Bridge (US 17/George P. Coleman Memorial Swing Bridge) across the York River, mile 7.0, between Gloucester Point and Yorktown, VA. This deviation is necessary to facilitate maintenance work on the moveable spans on the...
78 FR 11747 - Drawbridge Operation Regulations; Chelsea River, Chelsea and East Boston, MA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-20
... skew and must be adjusted to prevent damage to the operating system. The adjustment maintenance... with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33...
46 CFR 118.410 - Fixed gas fire extinguishing systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...
46 CFR 181.410 - Fixed gas fire extinguishing systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...
46 CFR 118.410 - Fixed gas fire extinguishing systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
... Toronto Reservoir, part of the Swinging Bridge Hydroelectric Project, is located on Black Lake Creek in.... Applicant Contact: Robert A. Gates, Senior Vice President Operations, Eagle Creek RE, LLC, 65 Madison Avenue... regarding recreation activities, hours of operation and maintenance scheduling. l. Locations of the...
The Computer: An Art Tool for the Visually Gifted. A Curriculum Guide.
ERIC Educational Resources Information Center
Suter, Thomas E.; Bibbey, Melissa R.
This curriculum guide, developed and used in Wheelersburg (Ohio) with visually talented students, shows how such students can be taught to utilize computers as an art medium and tool. An initial section covers program implementation including setup, class structure and scheduling, teaching strategies, and housecleaning and maintenance. Seventeen…
1991-03-01
Cliffs, New Jersey, 1989. Merritt, Dennis, "Forward Chaining in Prolog," Al Expert, v.7 November 1986. Minsky , Marvin ., "A Framework for Representing... Minsky , Marvin , (editor), Semantic Information Processing, MIT Press, 1968. Rychener, M. D., Production Systems as a Programming Language for Artificial
NASA Technical Reports Server (NTRS)
1978-01-01
The plan schedule and status of multiple objectives to be achieved in the development, manufacture, installation, and maintenance of two solar heated hot water prototype systems and two heat exchangers are reported. A computer program developed to resolve problems and evaluate system performance is described.
76 FR 45617 - Notice of Lodging of the Consent Decree Under the Clean Water Act
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
...) violations stemming from its failure to properly operate and maintain its Combined Sewer Collection System..., implement approved operation and maintenance schedules of its sewers, conduct a pump station evaluation, as... from the Consent Decree Library, P.O. Box 7611, U.S. Department of Justice, Washington, DC 20044-7611...
NASA Astrophysics Data System (ADS)
Drygin, Michael; Kuryshkin, Nicholas
2017-11-01
The article tells about forming a new concept of scheduled preventive repair system of the equipment at coal mining enterprises, based on the use of modem non-destructive evaluation methods. The approach to the solution for this task is based on the system-oriented analysis of the regulatory documentation, non-destructive evaluation methods and means, experimental studies with compilation of statistics and subsequent grapho-analytical analysis. The main result of the work is a feasible explanation of using non-destructive evaluation methods within the current scheduled preventive repair system, their high efficiency and the potential of gradual transition to condition-based maintenance. In practice wide use of nondestructive evaluation means w;ill allow to reduce significantly the number of equipment failures and to repair only the nodes in pre-accident condition. Considering the import phase-out policy, the solution for this task will allow to adapt the SPR system to Russian market economy conditions and give the opportunity of commercial move by reducing the expenses for maintenance of Russian-made and imported equipment.
Dry-running gas seals save $200,000/yr in retrofit hydrogen recycle compressor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pennacchi, R.P.; Germain, A.
1987-10-01
Texaco Chemical Company was using three drums of oil per day in the seal oil system of a hydrogen recycle compressor, resulting in maintenance and operational expenses of more than $160,000 per year. Running 24 hours/day, 365 days/yr, the 26-yr-old compressor is the heart of the benzene manufacturing process unit at the Port Arthur, Texas plant. In the event of an unscheduled shutdown, the important aromatics unit process would halt and cause production losses of thousands of dollars per day. In addition, the close monitoring and minimization of leakage are essential since the gas consists of over 75% hydrogen, withmore » methane, ethane, propane, isobutane, N-butane and pentanes. Texaco Chemical Company decided that retrofit of the hydrogen recycle compressor should be undertaken if the system could be developed to sharply reduce operations and maintenance costs, and increase efficiencies. Texaco engineers selected a dry running-type gas sealing system developed for pipeline compressors in the United States, Canada, and overseas. A tandem-type sealing system was designed to meet specific needs of a hydrogen recycle compressor. The retrofit was scheduled for August 1986 to coincide with the plant's preventative maintenance program. The seal system installation required five days. The retrofit progressed according to schedule, with no problems experienced at the first and several startups since the initial installation. Oil consumption has been eliminated, along with seal support and parasitic energy requirements. With the savings in seal oil, energy, operations and maintenance, payback period for the retrofit sealing system was just over six months. Savings are expected to continue at an annual rate of over $200,000.« less
Mateos, Maria-Victoria; Oriol, Albert; Martínez-López, Joaquín; Teruel, Ana-Isabel; Bengoechea, Enrique; Palomera, Luis; de Arriba, Felipe; Esseltine, Dixie-Lee; Cakana, Andrew; Pei, Lixia; van de Velde, Helgi; Miguel, Jesus San
2016-12-01
Bortezomib-melphalan-prednisone (VMP) is a standard-of-care for previously untreated, transplant-ineligible multiple myeloma (MM). Here, we compared outcomes between VMP regimens in the VISTA trial (9-cycle VMP schedule, including 4 cycles of twice weekly bortezomib) and the PETHEMA/GEM05 trial (less intensive 6-cycle VMP schedule with 1 cycle of twice weekly and 5 cycles of weekly bortezomib, then bortezomib-based maintenance). A total of 113 patient pairs matched by propensity score (estimated using logistic regression and incorporating eight exposure/outcome-related parameters) were included in this retrospective analysis. Median cumulative bortezomib dose was higher in PETHEMA/GEM05 than VISTA (49.6 vs 37.0 mg/m 2 ); median dose intensity was lower (2.0 vs 5.1 mg/m 2 /month). Median progression-free survival (PFS) and time-to-progression (TTP) were significantly longer in PETHEMA/GEM05 than VISTA (PFS, 30.5 vs 20.0 months, p = 0.0265; TTP, 33.8 vs 24.2 months, p = 0.0049) after a median follow-up of 77.2 and 26.0 months, respectively. Median overall survival (OS) was similar (61.3 vs 61.0 months, p = 0.6528; median follow-up, 77.6 vs 60.1 months). Post-induction complete response rate was lower in PETHEMA/GEM05 than VISTA (19 vs 31 %; p = 0.03318); on-study (including maintenance) rate was similar (30 vs 31 %; p = 0.89437). This analysis suggests that the less-intensive PETHEMA/GEM05 VMP regimen plus maintenance may improve PFS and TTP, but not OS, compared with the VISTA VMP regimen. NCT00111319, NCT00443235.
ECS: Efficient Communication Scheduling for Underwater Sensor Networks
Hong, Lu; Hong, Feng; Guo, Zhongwen; Li, Zhengbao
2011-01-01
TDMA protocols have attracted a lot of attention for underwater acoustic sensor networks (UWSNs), because of the unique characteristics of acoustic signal propagation such as great energy consumption in transmission, long propagation delay and long communication range. Previous TDMA protocols all allocated transmission time to nodes based on discrete time slots. This paper proposes an efficient continuous time scheduling TDMA protocol (ECS) for UWSNs, including the continuous time based and sender oriented conflict analysis model, the transmission moment allocation algorithm and the distributed topology maintenance algorithm. Simulation results confirm that ECS improves network throughput by 20% on average, compared to existing MAC protocols. PMID:22163775
Heimdall System for MSSS Sensor Tasking
NASA Astrophysics Data System (ADS)
Herz, A.; Jones, B.; Herz, E.; George, D.; Axelrad, P.; Gehly, S.
In Norse Mythology, Heimdall uses his foreknowledge and keen eyesight to keep watch for disaster from his home near the Rainbow Bridge. Orbit Logic and the Colorado Center for Astrodynamics Research (CCAR) at the University of Colorado (CU) have developed the Heimdall System to schedule observations of known and uncharacterized objects and search for new objects from the Maui Space Surveillance Site. Heimdall addresses the current need for automated and optimized SSA sensor tasking driven by factors associated with improved space object catalog maintenance. Orbit Logic and CU developed an initial baseline prototype SSA sensor tasking capability for select sensors at the Maui Space Surveillance Site (MSSS) using STK and STK Scheduler, and then added a new Track Prioritization Component for FiSST-inspired computations for predicted Information Gain and Probability of Detection, and a new SSA-specific Figure-of-Merit (FOM) for optimized SSA sensor tasking. While the baseline prototype addresses automation and some of the multi-sensor tasking optimization, the SSA-improved prototype addresses all of the key elements required for improved tasking leading to enhanced object catalog maintenance. The Heimdall proof-of-concept was demonstrated for MSSS SSA sensor tasking for a 24 hour period to attempt observations of all operational satellites in the unclassified NORAD catalog, observe a small set of high priority GEO targets every 30 minutes, make a sky survey of the GEO belt region accessible to MSSS sensors, and observe particular GEO regions that have a high probability of finding new objects with any excess sensor time. This Heimdall prototype software paves the way for further R&D that will integrate this technology into the MSSS systems for operational scheduling, improve the software's scalability, and further tune and enhance schedule optimization. The Heimdall software for SSA sensor tasking provides greatly improved performance over manual tasking, improved coordinated sensor usage, and tasking schedules driven by catalog improvement goals (reduced overall covariance, etc.). The improved performance also enables more responsive sensor tasking to address external events, newly detected objects, newly detected object activity, and sensor anomalies. Instead of having to wait until the next day's scheduling phase, events can be addressed with new tasking schedules immediately (within seconds or minutes). Perhaps the most important benefit is improved SSA based on an overall improvement to the quality of the space catalog. By driving sensor tasking and scheduling based on predicted Information Gain and other relevant factors, better decisions are made in the application of available sensor resources, leading to an improved catalog and better information about the objects of most interest. The Heimdall software solution provides a configurable, automated system to improve sensor tasking efficiency and responsiveness for SSA applications. The FISST algorithms for Track Prioritization, SSA specific task and resource attributes, Scheduler algorithms, and configurable SSA-specific Figure-of-Merit together provide optimized and tunable scheduling for the Maui Space Surveillance Site and possibly other sites and organizations across the U.S. military and for allies around the world.
Lecture: fotemustine in brain tumors.
Silvani, A; Gaviani, P; Lamperti, E; Botturi, A; Ferrari, D; Simonetti, G; Salmaggi, A
2011-11-01
Fotemustine (FTMS) is a third-generation nitrosourea, in preclinical studies, FTMS compared favorably with carmustine (BCNU) and lomustine (CCNU) against several human tumor cell lines. In conventional schedule, FTMS is administered at a dose of 100 mg/sqm/week for three consecutive weeks as induction (I) treatment, followed by 100 mg/sqm every three weeks, after a 5-week rest, as maintenance (M). Several Italian groups reported the results using FTMS in malignant glioma patients recurring after temozolomide standard treatment. In these papers, the 6-progression free survival are ranging from 20 to 52%. With the schedule (I + M) myelosuppression is observed in more than 30% of patients, and thrombocytopenia and leukopenia are more frequent and significant in Temozolomide pretreated patients. On the bases of the hematological toxicities several authors experimented new schedules of FTMS administrated at low doses. Recently, some authors reported the interesting results of a multicenter study on recurrent glioblastoma multiforme patients combining FTMS with new antiangiogentic agent bevacizumab.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship...; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal... of Engineers' scheduled maintenance shutdown of Barrier IIB. During the enforcement period, entry...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Occasional Use of Public Buildings Schedule of Use § 102-74.525 May Federal agencies reserve time... reserve time periods for the use of public areas for official Government business or for maintenance...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... all applicable corrective actions (replacing damaged parts). This supplemental NPRM would also require... of time that corresponds to the normal scheduled maintenance for most affected operators. In light of... ``before further flight'' for doing the corrective actions specified in paragraphs (f)(1)(i), (f)(1)(ii...
College of the Sequoias Faculty Attitudes Toward Office Hours and Facilities.
ERIC Educational Resources Information Center
McCormick, Anne
The opinions of the faculty at the College of the Sequoias, California, regarding their office facilities and scheduled office hours were surveyed. Ninety-nine faculty members completed a 10-item questionnaire, which is enclosed. It was found that the maintenance of faculty office hours and being available for students was viewed as an important…
Distributive Effects of Forest Service Attempts to Maintain Community Stability
Steven E. Daniels; William F. Hyde; David N. Wear
1991-01-01
Community stability is an objective of USDA Forest Service timber sales. This paper examines that objective, and the success the Forest Service can have in attaining it, through its intended maintenance of a constant volume timber harvest schedule. We apply a three-factor, two-sector modified general equilibrium model with empirical evidence from the timber-based...
NASTRAN maintenance and enhancement experiences
NASA Technical Reports Server (NTRS)
Schmitz, R. P.
1975-01-01
The current capability is described which includes isoparametric elements, optimization of grid point sequencing, and eigenvalue routine. Overlay and coding errors were corrected for cyclic symmetry, transient response, and differential stiffness rigid formats. Error corrections and program enhancements are discussed along with developments scheduled for the current year and a brief description of analyses being performed using the program.
40 CFR 1051.205 - What must I include in my application?
Code of Federal Regulations, 2014 CFR
2014-07-01
... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...
40 CFR 1051.205 - What must I include in my application?
Code of Federal Regulations, 2012 CFR
2012-07-01
... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...
40 CFR 1051.205 - What must I include in my application?
Code of Federal Regulations, 2013 CFR
2013-07-01
... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...
40 CFR 1051.205 - What must I include in my application?
Code of Federal Regulations, 2011 CFR
2011-07-01
... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...
ERIC Educational Resources Information Center
Patterson, Earl T.; And Others
Along with the broadening scope of behavioral programs at institutional settings has come the need for training non-professional staff to be competent behavior engineers. The two-fold purpose of this study was to explore the effectiveness of a self-scoring feedback system and two differenct schedules of reinforcement in maintaining daily training…
2004-02-26
Shorter payback periods After 19 Cost Benefit of Powerlink Rule of Thumb for Powerlink: Powerlink becomes more cost effective beyond 16 controlled...web enabled control (and management software) Increase in level of integration between building systems Increase in new features, functions, benefits ...focus on reducing run-time via Scheduling, Sensing, Switching Growing focus on payback Direct energy cost (with demand) Additional maintenance benefits
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... during the Sunday work window period. Although some of these flights would be conducted solely for the... or up to two times per year within the proposed work window. Scheduled light maintenance activities... people to the Station by helicopter to repair the beacon light. For each emergency repair event, the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... condition that cannot be repaired immediately shall be tagged and dated in a manner prescribed by the... missing horn for a period not exceeding seven calendar days; (3) A fire extinguisher readily available for use may temporarily replace a missing, defective or discharged fire extinguisher on a new on-track...
Code of Federal Regulations, 2014 CFR
2014-10-01
... condition that cannot be repaired immediately shall be tagged and dated in a manner prescribed by the... missing horn for a period not exceeding seven calendar days; (3) A fire extinguisher readily available for use may temporarily replace a missing, defective or discharged fire extinguisher on a new on-track...
Code of Federal Regulations, 2012 CFR
2012-10-01
... condition that cannot be repaired immediately shall be tagged and dated in a manner prescribed by the... missing horn for a period not exceeding seven calendar days; (3) A fire extinguisher readily available for use may temporarily replace a missing, defective or discharged fire extinguisher on a new on-track...
Code of Federal Regulations, 2011 CFR
2011-10-01
... condition that cannot be repaired immediately shall be tagged and dated in a manner prescribed by the... missing horn for a period not exceeding seven calendar days; (3) A fire extinguisher readily available for use may temporarily replace a missing, defective or discharged fire extinguisher on a new on-track...
Code of Federal Regulations, 2013 CFR
2013-10-01
... condition that cannot be repaired immediately shall be tagged and dated in a manner prescribed by the... missing horn for a period not exceeding seven calendar days; (3) A fire extinguisher readily available for use may temporarily replace a missing, defective or discharged fire extinguisher on a new on-track...
Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle
NASA Technical Reports Server (NTRS)
Patterson-Hine, Ann; Deb, Somnath; Kulkarni, Deepak; Wang, Yao; Lau, Sonie (Technical Monitor)
1998-01-01
The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.
Does telephone scheduling assistance increase mammography screening adherence?
Payton, Colleen A; Sarfaty, Mona; Beckett, Shirley; Campos, Carmen; Hilbert, Kathleen
2015-11-01
The 2 objectives were: 1) describe the use of a patient navigation process utilized to promote adherence to mammography screening within a primary care practice, and 2) determine the result of the navigation process and estimate the time required to increase mammography screening with this approach in a commercially insured patient population enrolled in a health maintenance organization. An evaluation of a nonrandomized practice improvement intervention. Women eligible for mammography (n = 298) who did not respond to 2 reminder letters were contacted via telephone by a navigator who offered scheduling assistance for mammography screening. The patient navigator scheduled appointments, documented the number of calls, and confirmed completed mammograms in the electronic health record, as well as estimated the time for calls and chart review. Of the 188 participants reached by phone, 112 (59%) scheduled appointments using the patient navigator, 35 (19%) scheduled their own appointments independently prior to the call, and 41 (22%) declined. As a result of the telephone intervention, 78 of the 188 women reached (41%) received a mammogram; also, all 35 women who had independently scheduled a mammogram received one. Chart documentation confirmed that 113 (38%) of the cohort of 298 women completed a mammogram. The estimated time burden for the entire project was 55 hours and 33 minutes, including calling patients, scheduling appointments, and chart review. A patient navigator can increase mammography adherence in a previously nonadherent population by making the screening appointment while the patient is on the phone.
Risk-based maintenance of ethylene oxide production facilities.
Khan, Faisal I; Haddara, Mahmoud R
2004-05-20
This paper discusses a methodology for the design of an optimum inspection and maintenance program. The methodology, called risk-based maintenance (RBM) is based on integrating a reliability approach and a risk assessment strategy to obtain an optimum maintenance schedule. First, the likely equipment failure scenarios are formulated. Out of many likely failure scenarios, the ones, which are most probable, are subjected to a detailed study. Detailed consequence analysis is done for the selected scenarios. Subsequently, these failure scenarios are subjected to a fault tree analysis to determine their probabilities. Finally, risk is computed by combining the results of the consequence and the probability analyses. The calculated risk is compared against known acceptable criteria. The frequencies of the maintenance tasks are obtained by minimizing the estimated risk. A case study involving an ethylene oxide production facility is presented. Out of the five most hazardous units considered, the pipeline used for the transportation of the ethylene is found to have the highest risk. Using available failure data and a lognormal reliability distribution function human health risk factors are calculated. Both societal risk factors and individual risk factors exceeded the acceptable risk criteria. To determine an optimal maintenance interval, a reverse fault tree analysis was used. The maintenance interval was determined such that the original high risk is brought down to an acceptable level. A sensitivity analysis is also undertaken to study the impact of changing the distribution of the reliability model as well as the error in the distribution parameters on the maintenance interval.
A strategic value management approach for energy and maintenance management in a building
NASA Astrophysics Data System (ADS)
Nawi, Mohd Nasrun Mohd; Dahlan, Nofri Yenita; Nadarajan, Santhirasegaran
2015-05-01
Fragmentation process is always been highlighted by the stakeholders in the construction industry as one of the `critical' issue that diminishing the opportunity for stakeholders that involved during the operation and maintenance stage to influence design decisions. Failure of design professionals to consider how a maintenance contractor or facility manager will construct the design thus results in higher operating cost, wastage, defects during the maintenance and operation process. Moving towards team integration is considered a significant strategy for overcoming the issue. Value Management is a style of management dedicated to guiding people and promoting innovation with the aim to improve overall building performance through structured, team-oriented exercises which make explicit, and appraise subsequent decisions, by reference to the value requirements of the clients. Accordingly, this paper discusses the fragmentation issue in more detail including the definition, causes and effects to the maintenance and operation of building and at the same time will highlighted the potential of VM integrated team approach as a strategic management approach for overcoming that issue. It also explores that the team integration strategy alleviates scheduling problems, delays and disputes during the construction process, and, hence, prevent harming the overall building performance.
NASA Briefing Previews Upcoming Spacewalks on ISS
2017-10-02
On Oct. 2, NASA held a briefing at the Johnson Space Center in Houston, to preview a trio of spacewalks in October to perform maintenance outside the International Space Station. Expedition 53 Commander Randy Bresnik of NASA will lead all three spacewalks, joined on Oct. 5 and 10 by Flight Engineer Mark Vande Hei, also of NASA. Flight Engineer Joe Acaba of NASA will join Bresnik on Oct. 18 for the third spacewalk. NASA TV coverage of the spacewalks will begin at 6:30 a.m. on Oct. 5, 10 and 18. Each spacewalk is scheduled to start at approximately 8:05 a.m., however, the spacewalks may begin earlier if the crew is running ahead of schedule.
The role of a nurse telephone call to prevent no-shows in endoscopy.
Childers, Ryan E; Laird, Amy; Newman, Lisa; Keyashian, Kian
2016-12-01
Preventing missed appointments, or "no-shows," is an important target in improving efficient patient care and lowering costs in gastrointestinal endoscopy practices. We aimed to investigate whether a nurse telephone call would reduce no-show rates for endoscopic appointments, and to determine if hiring and maintaining a nurse dedicated to pre-endoscopy phone calls is economically advantageous. Our secondary aim was to identify predictors of no-shows to endoscopy appointments. We hired and trained a full-time licensed nurse to make a telephone call to patients 7 days before their scheduled upper endoscopy or colonoscopy. We compared this intervention with a previous reminder system involving mailed reminders. The effect of the intervention and impact of other predictors of no-shows were analyzed in 2 similar preintervention and postintervention patient cohorts. A mixed effects logistic regression model was used to estimate the association of the odds of being a no-show to the scheduled appointment and the characteristics of the patient and visit. An analysis of costs was performed that included the startup and maintenance costs of the intervention. We found that a nurse phone call was associated with a 33% reduction in the odds of a no-show visit (odds ratio, 0.67; 95% confidence interval, 0.50-0.91), adjusting for gender, age, partnered status, insurer type, distance from the endoscopy center, and visit type. The recovered reimbursement during the study period was $48,765, with net savings of $16,190 when accounting for the maintenance costs of the intervention; this resulted in a net revenue per annum of $43,173. We found that endoscopy practices may increase revenue, improve scheduling efficiency, and maximize resource utilization by hiring a nurse to reduce no-shows. Predictors of no-shows to endoscopy included unpartnered or single patients, commercial or managed care, being scheduled for colonoscopy as opposed to upper endoscopy, and being scheduled for a screening or surveillance colonoscopy. Copyright © 2016 American Society for Gastrointestinal Endoscopy. Published by Elsevier Inc. All rights reserved.
Miceli, Teresa S.; Colson, Kathleen; Faiman, Beth M.; Miller, Kena; Tariman, Joseph D.
2014-01-01
About 90% of individuals with multiple myeloma will develop osteolytic bone lesions from increased osteoclastic and decreased osteoblastic activity. Severe morbidities from pathologic fractures and other skeletal events can lead to poor circulation, blood clots, muscle wasting, compromised performance status, and overall poor survival. Supportive care targeting bone disease is an essential adjunct to antimyeloma therapy. In addition, the maintenance of bone health in patients with multiple myeloma can significantly improve quality of life. Oncology nurses and other healthcare providers play a central role in the management of bone disease and maintenance throughout the course of treatment. Safe administration of bisphosphonates, promotion of exercise, maintenance of adequate nutrition, vitamin and mineral supplementation, scheduled radiographic examinations, and monitoring of bone complications are among the important functions that oncology nurses and healthcare providers perform in clinical practice. PMID:21816707
Miceli, Teresa S; Colson, Kathleen; Faiman, Beth M; Miller, Kena; Tariman, Joseph D
2011-08-01
About 90% of individuals with multiple myeloma will develop osteolytic bone lesions from increased osteoclastic and decreased osteoblastic activity. Severe morbidities from pathologic fractures and other skeletal events can lead to poor circulation, blood clots, muscle wasting, compromised performance status, and overall poor survival. Supportive care targeting bone disease is an essential adjunct to antimyeloma therapy. In addition, the maintenance of bone health in patients with multiple myeloma can significantly improve quality of life. Oncology nurses and other healthcare providers play a central role in the management of bone disease and maintenance throughout the course of treatment. Safe administration of bisphosphonates, promotion of exercise, maintenance of adequate nutrition, vitamin and mineral supplementation, scheduled radiographic examinations, and monitoring of bone complications are among the important functions that oncology nurses and healthcare providers perform in clinical practice.
2006-04-01
for Specific Aim #3 have yet been initiated, and are proceeding on schedule. The PhD candidate has completed her educational goals. 13 Appendix A ... LEVELS OF TELOMERE PROTEIN MRNAS ARE PREDICTIVE OF TELOMERE CONTENT IN HUMAN BREAST TUMORS Kimberly S. Butler, William C. Hines, Diana Roberts
Click to go to NDBC home page Select to go to the NWS homepage Home About Us Contact Us Search NDBC Web link to RSS feed access page Web Widget Email Access Web Data Guide Maintenance Schedule Station Status Information USA.gov is the U.S. government's official web portal to all federal, state and local government
Click to go to NDBC home page Select to go to the NWS homepage Home About Us Contact Us Search NDBC Web link to RSS feed access page Web Widget Email Access Web Data Guide Maintenance Schedule Station Status Information USA.gov is the U.S. government's official web portal to all federal, state and local government
AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT VII, ENGINE TUNE-UP--DETROIT DIESEL ENGINE.
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF TUNE-UP PROCEDURES FOR DIESEL ENGINES. TOPICS ARE SCHEDULING TUNE-UPS, AND TUNE-UP PROCEDURES. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "ENGINE TUNE-UP--DETROIT DIESEL ENGINE" AND OTHER MATERIALS. SEE VT 005 655 FOR FURTHER INFORMATION.…
Development and Maintenance of Choice in a Dynamic Environment
ERIC Educational Resources Information Center
Rodewald, Andrew M.; Hughes, Christine E.; Pitts, Raymond C.
2010-01-01
Four pigeons were exposed to a concurrent procedure similar to that used by Davison, Baum, and colleagues (e.g., Davison & Baum, 2000, 2006) in which seven components were arranged in a mixed schedule, and each programmed a different left:right reinforcer ratio (1:27, 1:9, 1:3, 1:1, 3:1, 9:1, 27:1). Components within each session were presented…
P-8A Poseidon Multi Mission Maritime Aircraft (P-8A)
2015-12-01
focus also includes procurement of depot and intermediate level maintenance capabilities, full scale fatigue testing, and continued integration and... Level Confidence Level of cost estimate for current APB: 50% The current APB cost estimate provided sufficient resources to execute the program under...normal conditions, encountering average levels of technical, schedule, and programmatic risk and external interference. It was consistent with
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... to keep one lift span closed to facilitate scheduled bridge maintenance. DATES: This deviation is... temporary deviation the Ferry Street Bridge may keep one lift span in the closed position from 8 a.m. on... January 13, 2011. One lift span shall remain operational at all times. In accordance with 33 CFR 117.35(e...
Reactor operations informal monthly report, May 1, 1995--May 31, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hauptman, H.M.; Petro, J.N.; Jacobi, O.
1995-05-01
This document is an informal progress report for the operational performance of the Brookhaven Medical Research Reactor, and the Brookhaven High Flux Beam Reactor, for the month of May, 1995. Both machines ran well during this period, with no reportable instrumentation problems, all scheduled maintenance performed, and only one reportable occurance, involving a particle on Vest Button, Personnel Radioactive Contamination.
Dezhurov performs in-flight maintenance in Mir Core module
1995-06-28
NM18-308-037 (28 June 1995) --- Onboard Mir, cosmonaut Vladimir N. Dezhurov prepares to change batteries at a power supply station as part of the preparation for the next day's scheduled docking with the Space Shuttle Atlantis. This visual was one of many shown by the Mir-18 crew at a press conference on July 18 in Houston.
NASA Technical Reports Server (NTRS)
1976-01-01
Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.
Messer, Michael M; Haller, Irina V
2017-01-01
Objective: Depression is a common condition among patients with multiple sclerosis and often becomes resistant to oral antidepressants. We report a patient with multiple sclerosis who developed severe treatment-resistant depression and who was successfully treated with intravenous ketamine over the period of two years. Methods: Ketamine treatment protocol included an initial series of six treatments administered every other day, followed by a maintenance schedule. Ketamine was administered intravenously at 0.5mg/kg of ideal body weight over 40 minutes. Depression symptoms were measured using Beck Depression Index. Results: The patient's Beck Depression Index score prior to initiating ketamine treatment was 38, corresponding to severe depression. Response to treatment, defined as 50-percent reduction in Beck Depression Index score, was observed after five treatments. For this patient, the maintenance schedule ranged from a weekly treatment to one treatment every three weeks. During the two-year observation period, this patient was able to maintain a stable non-depressed mood and had no worsening of her MS symptoms. Conclusion: Ketamine may be an alternative treatment for resistant depression and may have a special use in patients with multiple sclerosis.
High Reliability Engine Control Demonstrated for Aircraft Engines
NASA Technical Reports Server (NTRS)
Guo, Ten-Huei
1999-01-01
For a dual redundant-control system, which is typical for short-haul aircraft, if a failure is detected in a control sensor, the engine control is transferred to a safety mode and an advisory is issued for immediate maintenance action to replace the failed sensor. The safety mode typically results in severely degraded engine performance. The goal of the High Reliability Engine Control (HREC) program was to demonstrate that the neural-network-based sensor validation technology can safely operate an engine by using the nominal closed-loop control during and after sensor failures. With this technology, engine performance could be maintained, and the sensor could be replaced as a conveniently scheduled maintenance action.
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
Oracle Applications Patch Administration Tool (PAT) Beta Version
DOE Office of Scientific and Technical Information (OSTI.GOV)
2002-01-04
PAT is a Patch Administration Tool that provides analysis, tracking, and management of Oracle Application patches. This includes capabilities as outlined below: Patch Analysis & Management Tool Outline of capabilities: Administration Patch Data Maintenance -- track Oracle Application patches applied to what database instance & machine Patch Analysis capture text files (readme.txt and driver files) form comparison detail report comparison detail PL/SQL package comparison detail SQL scripts detail JSP module comparison detail Parse and load the current applptch.txt (10.7) or load patch data from Oracle Application database patch tables (11i) Display Analysis -- Compare patch to be applied with currentmore » Oracle Application installed Appl_top code versions Patch Detail Module comparison detail Analyze and display one Oracle Application module patch. Patch Management -- automatic queue and execution of patches Administration Parameter maintenance -- setting for directory structure of Oracle Application appl_top Validation data maintenance -- machine names and instances to patch Operation Patch Data Maintenance Schedule a patch (queue for later execution) Run a patch (queue for immediate execution) Review the patch logs Patch Management Reports« less
Partial maintenance of auditory-based cognitive training benefits in older adults
Anderson, Samira; White-Schwoch, Travis; Choi, Hee Jae; Kraus, Nina
2014-01-01
The potential for short-term training to improve cognitive and sensory function in older adults has captured the public’s interest. Initial results have been promising. For example, eight weeks of auditory-based cognitive training decreases peak latencies and peak variability in neural responses to speech presented in a background of noise and instills gains in speed of processing, speech-in-noise recognition, and short-term memory in older adults. But while previous studies have demonstrated short-term plasticity in older adults, we must consider the long-term maintenance of training gains. To evaluate training maintenance, we invited participants from an earlier training study to return for follow-up testing six months after the completion of training. We found that improvements in response peak timing to speech in noise and speed of processing were maintained, but the participants did not maintain speech-in-noise recognition or memory gains. Future studies should consider factors that are important for training maintenance, including the nature of the training, compliance with the training schedule, and the need for booster sessions after the completion of primary training. PMID:25111032
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.
2017-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.
Morais-Almeida, Mário; Arêde, Cristina; Sampaio, Graça; Borrego, Luis Miguel
2016-01-01
Traditional subcutaneous immunotherapy up dosing with allergenic extracts has been shown to be associated with frequent adverse reactions. In recent studies it has been demonstrated that using modified extracts, namely allergoids, it is a safe and effective procedure particularly on accelerated schedules. However data assessing its safety in paediatric age is scarce. To evaluate the safety profile in paediatric population of using modified allergen extracts, in an ultrarush schedule, to reach the maintenance dose in the first day. We included children undergoing treatment with subcutaneous immunotherapy during a five-year period, using modified aeroallergen extracts, depigmented, polymerized with glutaraldehyde and adsorbed on aluminium hydroxide using an ultrarush induction phase. The type of adverse reactions during the ultrarush protocol was recorded. We studied 100 paediatric patients (57 males) with a mean age of 11.6 years (5 to 18 years; standard deviation, 3.3), all with moderate to severe persistent rhinitis, with or without allergic conjunctivitis, asthma and atopic eczema, sensitized to mites and/or pollens. All reached the maintenance dose of 0.5 mL in the first day, except 1 child. During the ultrarush protocol the total number of injections was 199. There were 21 local adverse reactions in 11 patients, 11 immediate and 10 delayed; from those, had clinical relevance 1 immediate and 4 delayed. Systemic reactions were recorded in 2 cases, both immediate and mild. The ultrarush protocol, without premedication, was a safe alternative to be used in paediatric age during the induction phase of subcutaneous immunotherapy using allergoid depigmented extracts.
Arêde, Cristina; Sampaio, Graça; Borrego, Luis Miguel
2016-01-01
Background Traditional subcutaneous immunotherapy up dosing with allergenic extracts has been shown to be associated with frequent adverse reactions. In recent studies it has been demonstrated that using modified extracts, namely allergoids, it is a safe and effective procedure particularly on accelerated schedules. However data assessing its safety in paediatric age is scarce. Objective To evaluate the safety profile in paediatric population of using modified allergen extracts, in an ultrarush schedule, to reach the maintenance dose in the first day. Methods We included children undergoing treatment with subcutaneous immunotherapy during a five-year period, using modified aeroallergen extracts, depigmented, polymerized with glutaraldehyde and adsorbed on aluminium hydroxide using an ultrarush induction phase. The type of adverse reactions during the ultrarush protocol was recorded. Results We studied 100 paediatric patients (57 males) with a mean age of 11.6 years (5 to 18 years; standard deviation, 3.3), all with moderate to severe persistent rhinitis, with or without allergic conjunctivitis, asthma and atopic eczema, sensitized to mites and/or pollens. All reached the maintenance dose of 0.5 mL in the first day, except 1 child. During the ultrarush protocol the total number of injections was 199. There were 21 local adverse reactions in 11 patients, 11 immediate and 10 delayed; from those, had clinical relevance 1 immediate and 4 delayed. Systemic reactions were recorded in 2 cases, both immediate and mild. Conclusion The ultrarush protocol, without premedication, was a safe alternative to be used in paediatric age during the induction phase of subcutaneous immunotherapy using allergoid depigmented extracts. PMID:26844218
Evaluation Model for Pavement Surface Distress on 3d Point Clouds from Mobile Mapping System
NASA Astrophysics Data System (ADS)
Aoki, K.; Yamamoto, K.; Shimamura, H.
2012-07-01
This paper proposes a methodology to evaluate the pavement surface distress for maintenance planning of road pavement using 3D point clouds from Mobile Mapping System (MMS). The issue on maintenance planning of road pavement requires scheduled rehabilitation activities for damaged pavement sections to keep high level of services. The importance of this performance-based infrastructure asset management on actual inspection data is globally recognized. Inspection methodology of road pavement surface, a semi-automatic measurement system utilizing inspection vehicles for measuring surface deterioration indexes, such as cracking, rutting and IRI, have already been introduced and capable of continuously archiving the pavement performance data. However, any scheduled inspection using automatic measurement vehicle needs much cost according to the instruments' specification or inspection interval. Therefore, implementation of road maintenance work, especially for the local government, is difficult considering costeffectiveness. Based on this background, in this research, the methodologies for a simplified evaluation for pavement surface and assessment of damaged pavement section are proposed using 3D point clouds data to build urban 3D modelling. The simplified evaluation results of road surface were able to provide useful information for road administrator to find out the pavement section for a detailed examination and for an immediate repair work. In particular, the regularity of enumeration of 3D point clouds was evaluated using Chow-test and F-test model by extracting the section where the structural change of a coordinate value was remarkably achieved. Finally, the validity of the current methodology was investigated by conducting a case study dealing with the actual inspection data of the local roads.
Bottom to Top Approach for Railway KPI Generation
NASA Astrophysics Data System (ADS)
Villarejo, Roberto; Johansson, Carl-Anders; Leturiondo, Urko; Simon, Victor; Seneviratne, Dammika; Galar, Diego
2017-09-01
Railway maintenance especially on infrastructure produces a vast amount of data. However, having data is not synonymous with having information; rather, data must be processed to extract information. In railway maintenance, the development of key performance indicators (KPIs) linked to punctuality or capacity can help planned and scheduled maintenance, thus aligning the maintenance department with corporate objectives. There is a need for an improved method to analyse railway data to find the relevant KPIs. The system should support maintainers, answering such questions as what maintenance should be done, where and when. The system should equip the user with the knowledge of the infrastructure's condition and configuration, and the traffic situation so maintenance resources can be targeted to only those areas needing work. The amount of information is vast, so it must be hierarchized and aggregated; users must filter out the useless indicators. Data are fused by compiling several individual indicators into a single index; the resulting composite indicators measure multidimensional concepts which cannot be captured by a single index. The paper describes a method of monitoring a complex entity. In this scenario, a plurality of use indices and weighting values are used to create a composite and aggregated use index from a combination of lower level use indices and weighting values. The resulting composite and aggregated indicators can be a decision-making tool for asset managers at different hierarchical levels.
Incorporating Equipment Condition Assessment in Risk Monitors for Advanced Small Modular Reactors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coble, Jamie B.; Coles, Garill A.; Meyer, Ryan M.
2013-10-01
Advanced small modular reactors (aSMRs) can complement the current fleet of large light-water reactors in the USA for baseload and peak demand power production and process heat applications (e.g., water desalination, shale oil extraction, hydrogen production). The day-to-day costs of aSMRs are expected to be dominated by operations and maintenance (O&M); however, the effect of diverse operating missions and unit modularity on O&M is not fully understood. These costs could potentially be reduced by optimized scheduling, with risk-informed scheduling of maintenance, repair, and replacement of equipment. Currently, most nuclear power plants have a “living” probabilistic risk assessment (PRA), which reflectsmore » the as-operated, as-modified plant and combine event probabilities with population-based probability of failure (POF) for key components. “Risk monitors” extend the PRA by incorporating the actual and dynamic plant configuration (equipment availability, operating regime, environmental conditions, etc.) into risk assessment. In fact, PRAs are more integrated into plant management in today’s nuclear power plants than at any other time in the history of nuclear power. However, population-based POF curves are still used to populate fault trees; this approach neglects the time-varying condition of equipment that is relied on during standard and non-standard configurations. Equipment condition monitoring techniques can be used to estimate the component POF. Incorporating this unit-specific estimate of POF in the risk monitor can provide a more accurate estimate of risk in different operating and maintenance configurations. This enhanced risk assessment will be especially important for aSMRs that have advanced component designs, which don’t have an available operating history to draw from, and often use passive design features, which present challenges to PRA. This paper presents the requirements and technical gaps for developing a framework to integrate unit-specific estimates of POF into risk monitors, resulting in enhanced risk monitors that support optimized operation and maintenance of aSMRs.« less
Bond, Ashley; Dodd, Susanna; Fisher, Gareth; Skouras, Thomas; Subramanian, Sreedhar
2017-02-01
Combination therapy with infliximab and immunomodulators is superior to monotherapy, resulting in better outcomes and higher trough levels of infliximab. The role of concurrent immunomodulatory therapy on adalimumab trough levels has not been adequately investigated. We evaluated the impact of concomitant immunomodulation on adalimumab trough levels in patients on scheduled maintenance therapy. We conducted a prospective observational, cross-sectional study of all inflammatory bowel disease patients on maintenance therapy who had adalimumab trough levels measured between January 2013 and January 2016. Drug level and anti-drug antibody measurements were performed on sera using a solid phase assay. Pairwise comparison of means was used to compare trough levels in patients with and without concomitant immune modulator therapy. In total, 79 patients were included. Twenty-three patients (29.1%) were on weekly dosing whereas 56 (70.9%) were on alternate weeks. Median adalimumab trough levels were comparable in patients with and without clinical remission (6.8 μg/ml (IQR 5.6-8.1) versus 6.7 μg/ml (IQR 3.9-8.1), respectively. Patients with an elevated faecal calprotectin >250 μg/g had lower adalimumab trough levels (median 6.7, IQR 3.9-8) compared to patients with faecal calprotectin <250 μg/g (median 7.7, IQR 6.1-8.1) though this did not achieve statistical significance (p = .062). Median adalimumab trough levels among patients on concurrent immunomodulators was 7.2 μg/ml (IQR 5.7-8.1) compared to those not on concurrent immunomodulator, 6.1 μg/ml (IQR 2.7-7.7, p = .0297). Adalimumab trough levels were significantly higher in patients on concurrent immunomodulators during maintenance therapy. There was a trend towards a lower adalimumab trough level in patients with elevated calprotectin.
Advanced flight control system study
NASA Technical Reports Server (NTRS)
Mcgough, J.; Moses, K.; Klafin, J. F.
1982-01-01
The architecture, requirements, and system elements of an ultrareliable, advanced flight control system are described. The basic criteria are functional reliability of 10 to the minus 10 power/hour of flight and only 6 month scheduled maintenance. A distributed system architecture is described, including a multiplexed communication system, reliable bus controller, the use of skewed sensor arrays, and actuator interfaces. Test bed and flight evaluation program are proposed.
Space tug point design study. Volume 4: Program requirements
NASA Technical Reports Server (NTRS)
1973-01-01
A study was conducted to determine the configuration of a space tug and to predict the performance parameters. The program plans and planning data generated in support of the tug development program are presented. The preliminary plans and supporting planning data emphasize the following requirements: (1) maintenance and refurbishment, (2) technology development, (3) production, (4) test facilities, (5) quality control, and (6) scheduling.
ERIC Educational Resources Information Center
BRI Systems, Inc., Phoenix, AZ.
This handbook offers a practical approach for pupil transportation energy management by suggesting ideas to save fuel in the purchasing, planning, routing, scheduling, driving, and maintenance areas of the pupil transportation operation. The handbook is divided into seven parts. Part 1 and 2 provide insight into energy management in pupil…
2000-12-06
KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialist Laurel Clark looks over equipment and paperwork for the mission. She and other crew members are taking part in In-Flight Maintenance training. As a research mission, STS-107will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialist Laurel Clark looks over equipment and paperwork for the mission. She and other crew members are taking part in In-Flight Maintenance training. As a research mission, STS-107will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
An Empirical Study of the Contracting Officer Representative’s Social Network
2013-09-01
any and all unforeseen environmental, explosive, safety , scheduling, and regulatory issues for the cleanup sites at APG that fall under the...wide range of investigative, remedial design, remedial construction, and remediation services required for hazardous substance and waste sites. This...engineering, data collection, and environmental remediation) than those previously examined ( food service and aircraft maintenance) as well, offering a broader
Amphetamine increases schedule-induced drinking reduced by negative punishment procedures.
Pérez-Padilla, Angeles; Pellón, Ricardo
2003-05-01
d-Amphetamine has been reported to increase schedule-induced drinking punished by lick-dependent signalled delays in food delivery. This might reflect a drug-behaviour interaction dependent on the type of punisher, because no such effect has been found when drinking was reduced by lick-contingent electric shocks. However, the anti-punishment effect of amphetamine could be mediated by other behavioural processes, such as a loss of discriminative control or an increase in the value of delayed reinforcers. To test the effects of d-amphetamine on the acquisition and maintenance of schedule-induced drinking reduced by unsignalled delays in food delivery. Rats received 10-s unsignalled delays initiated by each lick after polydipsia was induced by a fixed-time 30-s food reinforcement schedule or from the outset of the experiment. Yoked-control rats received these same delays but independently of their own behaviour. d-Amphetamine (0.1-3.0 mg/kg) was then tested IP. d-Amphetamine dose-dependently increased and then decreased punished schedule-induced drinking. The drug led to dose-dependent reductions when the delays were not contingent or when they were applied from the outset of training. These results support the contention that d-amphetamine has an increasing effect on schedule-induced drinking that has been previously reduced by a negative punishment procedure. This effect cannot be attributed to other potentially involved processes, and therefore support the idea that drug effects on punished behaviour depend on punishment being delays in food or shock deliveries.
Improvements in Space Surveillance Processing for Wide Field of View Optical Sensors
NASA Astrophysics Data System (ADS)
Sydney, P.; Wetterer, C.
2014-09-01
For more than a decade, an autonomous satellite tracking system at the Air Force Maui Optical and Supercomputing (AMOS) observatory has been generating routine astrometric measurements of Earth-orbiting Resident Space Objects (RSOs) using small commercial telescopes and sensors. Recent work has focused on developing an improved processing system, enhancing measurement performance and response while supporting other sensor systems and missions. This paper will outline improved techniques in scheduling, detection, astrometric and photometric measurements, and catalog maintenance. The processing system now integrates with Special Perturbation (SP) based astrodynamics algorithms, allowing covariance-based scheduling and more precise orbital estimates and object identification. A merit-based scheduling algorithm provides a global optimization framework to support diverse collection tasks and missions. The detection algorithms support a range of target tracking and camera acquisition rates. New comprehensive star catalogs allow for more precise astrometric and photometric calibrations including differential photometry for monitoring environmental changes. This paper will also examine measurement performance with varying tracking rates and acquisition parameters.
Response-food delay gradients for lever pressing and schedule-induced licking in rats.
Pellón, Ricardo; Pérez-Padilla, Angeles
2013-06-01
Eight food-deprived Wistar rats developed stable patterns of lever pressing and licking when exposed to a fixed-time 30-s schedule of food pellet presentation. The rats were trained to lever press by presenting the lever 10 s before the programmed food delivery, with the food pellet being delivered immediately upon a lever press. The operant contingency was then removed and the lever was inserted through the entire interfood interval, being withdrawn with food delivery and reinserted 2 s later. On successive phases of the study, a protective contingency postponed food delivery if responses (lever presses or licks) occurred within the last 1, 2, 5, 10, 20, or 25 s of the interfood interval. Lever pressing was reduced at much shorter response-food delays than those that reduced licking. These results demonstrate that reinforcement contributes to the maintenance of different response patterns on periodic schedules, and that different responses are differentially sensitive to delays.
Web-Based Requesting and Scheduling Use of Facilities
NASA Technical Reports Server (NTRS)
Yeager, Carolyn M.
2010-01-01
Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.
Human reliability and plant operating efficiency: Are 12-hour work schedules cause for concern
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baker, T.L.
1992-01-01
Since the introduction of 12-h shifts to the US nuclear power industry only 8 yr ago, compressed workweek schedules have proliferated among operations departments at a phenomenal rate. Many plants that continue to use 8-h shifts during normal operations routinely change to scheduled 12-h shifts during refueling or maintenance outages. The most critical issue in the use of extended work shifts is whether alertness, physical stamina, or mental performance are compromised to the point of reducing safety or efficiency of nuclear power plant operation. Laboratory and field research sponsored by the National Institute of Occupational Safety and Health suggests thatmore » alertness, measured by self-ratings, and mental performance, measured by computer-based performance tests, are impaired on 12-h shifts compared with 8-h shifts. In contrast to these findings, plant operating efficiency and operator performance have been rated as improved in two field studies conducted in operating nuclear power plants (Fast Flux Test Facility, Washington and Ontario Hydro, Canada). A recent Electric Power Research Institute review of nuclear industry experience with 12-h shifts also suggests an overwhelmingly positive rating of 12-h schedules from both control room operators and management.« less
NASA Astrophysics Data System (ADS)
Khalqihi, K. I.; Rahayu, M.; Rendra, M.
2017-12-01
PT Perkebunan Nusantara VIII Ciater is a company produced black tea orthodox more or less 4 tons every day. At the production section, PT Perkebunan Nusantara VIII will use local exhaust ventilation specially at sortation area on sieve machine. To maintain the quality of the black tea orthodox, all machine must be scheduled for maintenance every once a month and takes time 2 hours in workhours, with additional local exhaust ventilation, it will increase time for maintenance process, if maintenance takes time more than 2 hours it will caused production process delayed. To support maintenance process in PT Perkebunan Nusantara VIII Ciater, designing local exhaust ventilation using design for assembly approach with Boothroyd and Dewhurst method, design for assembly approach is choosen to simplify maintenance process which required assembly process. There are 2 LEV designs for this research. Design 1 with 94 components, assembly time 647.88 seconds and assembly efficiency level 23.62%. Design 2 with 82 components, assembly time 567.84 seconds and assembly efficiency level 24.83%. Design 2 is choosen for this research based on DFA goals, minimum total part that use, optimization assembly time, and assembly efficiency level.
Commercial Aircraft Maintenance Experience Relating to Engine External Hardware
NASA Technical Reports Server (NTRS)
Soditus, Sharon M.
2006-01-01
Airlines are extremely sensitive to the amount of dollars spent on maintaining the external engine hardware in the field. Analysis reveals that many problems revolve around a central issue, reliability. Fuel and oil leakage due to seal failure and electrical fault messages due to wire harness failures play a major role in aircraft delays and cancellations (D&C's) and scheduled maintenance. Correcting these items on the line requires a large investment of engineering resources and manpower after the fact. The smartest and most cost effective philosophy is to build the best hardware the first time. The only way to do that is to completely understand and model the operating environment, study the field experience of similar designs and to perform extensive testing.
Linnehan on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006790 (15/16 March 2008) --- Astronauts Mike Foreman and Rick Linnehan (partially out of frame), both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
Linnehan and Foreman on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006788 (15/16 March 2008) --- Astronauts Mike Foreman (left) and Rick Linnehan, both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
Linnehan and Foreman on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006781 (15/16 March 2008) --- Astronauts Rick Linnehan (right) and Mike Foreman, both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
Expert Computer Systems for Missile Maintenance.
1983-08-09
ADDRESS(II different from Controlling Office) IS. SECURITY CLASS. (of thl report) Unclassified 1Sa. DECL ASSI FICATION/ DOWNGRADING - SCHEDULE I...circuit, and with the diagnostic methods used by the technicians responsible for maintain- ing it, we decided that we should visit Owego. On October 20...This trip was useful in several respects: 1. Insight was gained into the methods used by the technicians to diagnose a faulty circuit. 2. We learned what
Software selection based on analysis and forecasting methods, practised in 1C
NASA Astrophysics Data System (ADS)
Vazhdaev, A. N.; Chernysheva, T. Y.; Lisacheva, E. I.
2015-09-01
The research focuses on the problem of a “1C: Enterprise 8” platform inboard mechanisms for data analysis and forecasting. It is important to evaluate and select proper software to develop effective strategies for customer relationship management in terms of sales, as well as implementation and further maintenance of software. Research data allows creating new forecast models to schedule further software distribution.
75 FR 63086 - Drawbridge Operation Regulations; Duluth Ship Canal (Duluth-Superior Harbor).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
...Commander, Ninth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Duluth Ship Canal Aerial Bridge at Mile 0.1 over the Duluth Ship Canal, at Duluth, MN, for scheduled maintenance. During this temporary deviation the bridge will be secured to masted navigation. Vessels that can pass under the bridge without an opening may do so at any time.
Walheim and Schlegel during EVA 2
2008-02-13
S122-E-008200 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel (top) and NASA astronaut Rex Walheim, both STS-122 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Walheim and Schlegel worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
2008-02-13
S122-E-008315 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
2008-02-13
S122-E-008195 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
2008-02-13
S122-E-008325 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
Walheim and Schlegel during EVA 2
2008-02-13
S122-E-008199 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel (right) and NASA astronaut Rex Walheim, both STS-122 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Walheim and Schlegel worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
2008-02-13
S122-E-008219 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
Comparative Studies of Organizational Factors, in Military Maintenance
1979-06-01
perform effectively on the job. (9) Satisfaction with Supervision. The degree to which an employee is satisfied withi the wcrk supervision and guidance in...Effectiveness. The degree to which an employee feels his supervisor is effectively performing his job. (2) Satisfaction with Scheduling. The degree...allowed a worker to complete tasks mure often. Workers did not have to leave the platoon to perform work details, and this increased their work satisfaction
2008-04-01
suitability would result in safer landings and reduced maintenance costs associated with an intended area of operations 2.1.2. Concept of... cost , integration, logistics, ownership, performance, schedule, and user perception. Criteria were developed for three timeframes—reflecting the end...analysis.. Changed runway finder back to six cardinal headings or user specified headings. Added NASA ACCA cloud recognition filter. Added switches for
2000-12-06
KENNEDY SPACE CENTER, FLA. -- STS-107 Pilot William C. “Willie” McCool (left) and Commander Rick D. Husband look over equipment for their mission. They and other crew members are taking part in In-Flight Maintenance training. Research mission STS-107, scheduled to launch July 19, 2001, will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science
2000-12-06
KENNEDY SPACE CENTER, FLA. -- STS-107 Pilot William C. “Willie” McCool (left) and Commander Rick D. Husband look over equipment for their mission. They and other crew members are taking part in In-Flight Maintenance training. Research mission STS-107, scheduled to launch July 19, 2001, will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science
Energy consumption analysis for the Mars deep space station
NASA Technical Reports Server (NTRS)
Hayes, N. V.
1982-01-01
Results for the energy consumption analysis at the Mars deep space station are presented. It is shown that the major energy consumers are the 64-Meter antenna building and the operations support building. Verification of the antenna's energy consumption is highly dependent on an accurate knowlege of the tracking operations. The importance of a regular maintenance schedule for the watt hour meters installed at the station is indicated.
Development of Diesel Engine Diagnostics for U.S. Coast Guard Cutters.
1981-07-01
even though this type of transducer is sensitive to both acoustic noise and mechanical vibration. These "noise" signals are ordinarily of much higher...Unfortunately, this maintenance work was not scheduled for the immediate future, but the E.O. did agree to make exhaust pyrometer readings for the...pressure pulsations normally present in the engine crankcase. However, the very sensitive pressure transducer apparently registered the acoustical
A comparison of CLIPS- and LISP-based approaches to the development of a real-time expert system
NASA Technical Reports Server (NTRS)
Frainier, R.; Groleau, N.; Bhatnagar, R.; Lam, C.; Compton, M.; Colombano, S.; Lai, S.; Szolovits, P.; Manahan, M.; Statler, I.
1990-01-01
This paper describes an ongoing expert system development effort started in 1988 which is evaluating both CLIPS- and LISP- based approaches. The expert system is being developed to a project schedule and is planned for flight on Space Shuttle Mission SLS-2 in 1992. The expert system will help astronauts do the best possible science for a vestibular physiology experiment already scheduled for that mission. The system gathers and reduces data from the experiment, flags 'interesting' results, and proposes changes in the experiment both to exploit the in-flight observations and to stay within the time allowed by Mission Control for the experiment. These tasks must all be performed in real time. Two Apple Macintosh computers are used. The CLIPS- and LISP- based environments are layered above the Macintosh computer Operating System. The 'CLIPS-based' environment includes CLIPS and HyperCard. The LlSP-based environment includes Common LISP, Parmenides (a frame system), and FRuleKit (a rule system). Important evaluation factors include ease of programming, performance against real-time requirements, usability by an astronaut, robustness, and ease of maintenance. Current results on the factors of ease of programming, performance against real-time requirements, and ease of maintenance are discussed.
RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System
NASA Astrophysics Data System (ADS)
Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.
2008-08-01
RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.
A Phase 1 study of Vorinostat Maintenance after Autologous Transplant in High Risk Lymphoma
Hofmeister, Craig C.; Williams, Nita; Geyer, Susan; Hade, Erinn M.; Bowers, Mindy A.; Earl, Christian T.; Vaughn, John; Bingman, Anissa; Humphries, Kristina; Lozanski, Gerard; Baiocchi, Robert A.; Jaglowski, Samantha M.; Blum, Kristie; Porcu, Pierluigi; Flynn, Joseph; Penza, Sam; Benson, Don M.; Andritsos, Leslie A.; Devine, Steven M.
2014-01-01
Only a minority of patients with high risk lymphoma will be cured with autologous transplant, so maintenance with Vorinostat, an oral agent with activity in relapsed lymphoma, was studied starting day +60 for 21 consecutive days followed by a week off for up to 11 cycles. Twenty-three lymphoma patients were treated. Ten patients completed the full 11 cycle treatment plan per protocol, 4 patients were removed due to progressive disease, 7 withdrew or were removed from the study due to toxicities. Despite Prevnar vaccine administration every 2 months for 3 injections, the mean antibody concentration never reached protective levels (>0.35 mcg/mL). Fatigue and functional well-being measured by BFI and FACT-G improved significantly from cycle 1 to cycle 7, but the depression scores from the CES-D did not change. Given the toxicities observed, this broad spectrum deacetylase inhibitor at this schedule is not optimal for prolonged maintenance therapy. PMID:25213183
Aerojet advanced engine concept
NASA Technical Reports Server (NTRS)
Schoenman, L.
1984-01-01
The future orbit transfer vehicle (OTV) requirements which dictate the need for a highly versatile, highly reliable, reusable propulsion module are discussed. To attain maximum operational economy, space-basing is essential. This requires a reusable, maintenance free engine. The design features of this space based engine are defined. A new engine cycle and its advantages allow all the maintenance goals to be attained. Rubbing contact and interpropellant seals and purges are eliminated when GO2 is used to drive the LO2 pump. The TPA design has only one moving part. The use of both GH2 and GO2 to drive the turbines lowers the turbine temperatures in addition lower GH2 temperatures and pressures improve chamber cooling and longer life. The use of GO2 as a turbine drive fluid is addressed. Space based engines require an integrated control and health monitoring system to improve system reliability and eliminate all scheduled maintenance. It is concluded that all OTV propulsion requirements can be fulfilled with a single engine. The technological developments required to demonstrate that engine are outlined.
Heavy equipment maintenance wastes and environmental management in the mining industry.
Guerin, Turlough F
2002-10-01
Maintenance wastes, if not managed properly, represent significant environmental issues for mining operations. Petroleum hydrocarbon liquid wastes were studied at an Australian site and a review of the literature and technology vendors was carried out to identify oil/water separation technologies. Treatment technologies and practices for managing oily wastewater, used across the broader mining industry in the Asia-Pacific region, were also identified. Key findings from the study were: (1) primary treatment is required to remove grease oil contamination and to protect secondary oily wastewater treatment systems from being overloaded; (2) selection of an effective secondary treatment system is dependent on influent oil droplet size and concentration, suspended solids concentration, flow rates (and their variability), environmental conditions, maintenance schedules and effectiveness, treatment targets and costs; and (3) oily wastewater treatment systems, based on mechanical separation, are favoured over those that are chemically based, as they simplify operational requirements. Source reduction, through housekeeping, equipment and reagent modifications, and segregation and/or consolidation of hydrocarbon waste streams, minimizes treatment costs, safety and environmental impact.
Effect of (L)-cysteine on acetaldehyde self-administration.
Peana, Alessandra T; Muggironi, Giulia; Fois, Giulia R; Zinellu, Manuel; Sirca, Donatella; Diana, Marco
2012-08-01
Acetaldehyde (ACD), the first metabolite of ethanol, has been implicated in several behavioural actions of alcohol, including its reinforcing effects. Recently, we reported that l-cysteine, a sequestrating agent of ACD, reduced oral ethanol self-administration and that ACD was orally self-administered. This study examined the effects of l-cysteine pre-treatment during the acquisition and maintenance phases of ACD (0.2%) self-administration as well as on the deprivation effect after ACD extinction and on a progressive ratio (PR) schedule of reinforcement. In a separate PR schedule of reinforcement, the effect of l-cysteine was assessed on the break-point produced by ethanol (10%). Furthermore, we tested the effect of l-cysteine on saccharin (0.2%) reinforcement. Wistar rats were trained to self-administer ACD by nose poking on a fixed ratio (FR1) schedule in 30-min daily sessions. Responses on an active nose-poke caused delivery of ACD solution, whereas responses on an inactive nose-poke had no consequences. l-cysteine reduced the acquisition (40 mg/kg), the maintenance and the deprivation effect (100 mg/kg) of ACD self-administration. Furthermore, at the same dose, l-cysteine (120 mg/kg) decreased both ACD and ethanol break point. In addition, l-cysteine was unable to suppress the different responses for saccharin, suggesting that its effect did not relate to an unspecific decrease in a general motivational state. Compared to saline, l-cysteine did not modify responses on inactive nose-pokes, suggesting an absence of a non-specific behavioural activation. Taken together, these results could support the hypotheses that ACD possesses reinforcing properties and l-cysteine reduces motivation to self-administer ACD. Copyright © 2012 Elsevier Inc. All rights reserved.
Integrating O/S models during conceptual design, part 3
NASA Technical Reports Server (NTRS)
Ebeling, Charles E.
1994-01-01
Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.
Therapeutic drug monitoring of eculizumab: Rationale for an individualized dosing schedule.
Gatault, Philippe; Brachet, Guillaume; Ternant, David; Degenne, Danielle; Récipon, Guillaume; Barbet, Christelle; Gyan, Emmanuel; Gouilleux-Gruart, Valérie; Bordes, Cécile; Farrell, Alexandra; Halimi, Jean Michel; Watier, Hervé
2015-01-01
The annual cost of eculizumab maintenance therapy in paroxysmal nocturnal hemoglobinuria (PNH) and atypical hemolytic-uremic syndrome (aHUS) exceeds $300,000 per patient. A better understanding of eculizumab pharmacokinetics and subsequent individual dose adjustment could reduce this cost. We measured the trough eculizumab concentration in 9 patients with maintenance therapy (aHUS, n = 7; PNH, n = 2) and determined: 1) the intra- and inter-individual variability; 2) the influence of weight on eculizumab pharmacokinetics; and 3) the rate of elimination of eculizumab following discontinuation. A one-compartment model was developed to describe the pharmacokinetics of eculizumab and predicted complement activity by body weight. Trough eculizumab concentrations were >50 µg/mL in 9/9, >100 µg/mL in 8/9, and >300 µg/mL in 5/9 of patients. Intra-individual variability was low but eculizumab concentrations, closely correlated with patient weight (R(2) = 0.66, p = 0.034), varied broadly (55 ± 12 to 733 ± 164 µg/mL). Pharmacokinetic modeling showed that the elimination half-life varied greatly, with an increase from 7.8 d in a patient weighing 100 kg to 19.5 d in a 40 kg patient. We predicted that infusions of 1200 mg could be spaced every 4 or 6 weeks in patients weighing <90 and <70 kg, respectively. In this pilot study, the current recommended use of a fixed eculizumab dose for maintenance therapy is associated with excessively high trough concentrations in many patients. Further prospective larger studies are now required to support an individualized schedule adjusted for patient weight and based on the observed trough serum eculizumab concentration.
Therapeutic drug monitoring of eculizumab: Rationale for an individualized dosing schedule
Gatault, Philippe; Brachet, Guillaume; Ternant, David; Degenne, Danielle; Récipon, Guillaume; Barbet, Christelle; Gyan, Emmanuel; Gouilleux-Gruart, Valérie; Bordes, Cécile; Farrell, Alexandra; Halimi, Jean Michel; Watier, Hervé
2015-01-01
The annual cost of eculizumab maintenance therapy in paroxysmal nocturnal hemoglobinuria (PNH) and atypical hemolytic–uremic syndrome (aHUS) exceeds $300,000 per patient. A better understanding of eculizumab pharmacokinetics and subsequent individual dose adjustment could reduce this cost. We measured the trough eculizumab concentration in 9 patients with maintenance therapy (aHUS, n = 7; PNH, n = 2) and determined: 1) the intra- and inter-individual variability; 2) the influence of weight on eculizumab pharmacokinetics; and 3) the rate of elimination of eculizumab following discontinuation. A one-compartment model was developed to describe the pharmacokinetics of eculizumab and predicted complement activity by body weight. Trough eculizumab concentrations were >50 µg/mL in 9/9, >100 µg/mL in 8/9, and >300 µg/mL in 5/9 of patients. Intra-individual variability was low but eculizumab concentrations, closely correlated with patient weight (R2 = 0.66, p = 0.034), varied broadly (55 ± 12 to 733 ± 164 µg/mL). Pharmacokinetic modeling showed that the elimination half-life varied greatly, with an increase from 7.8 d in a patient weighing 100 kg to 19.5 d in a 40 kg patient. We predicted that infusions of 1200 mg could be spaced every 4 or 6 weeks in patients weighing <90 and <70 kg, respectively. In this pilot study, the current recommended use of a fixed eculizumab dose for maintenance therapy is associated with excessively high trough concentrations in many patients. Further prospective larger studies are now required to support an individualized schedule adjusted for patient weight and based on the observed trough serum eculizumab concentration. PMID:26337866
A Hybrid Memetic Framework for Coverage Optimization in Wireless Sensor Networks.
Chen, Chia-Pang; Mukhopadhyay, Subhas Chandra; Chuang, Cheng-Long; Lin, Tzu-Shiang; Liao, Min-Sheng; Wang, Yung-Chung; Jiang, Joe-Air
2015-10-01
One of the critical concerns in wireless sensor networks (WSNs) is the continuous maintenance of sensing coverage. Many particular applications, such as battlefield intrusion detection and object tracking, require a full-coverage at any time, which is typically resolved by adding redundant sensor nodes. With abundant energy, previous studies suggested that the network lifetime can be maximized while maintaining full coverage through organizing sensor nodes into a maximum number of disjoint sets and alternately turning them on. Since the power of sensor nodes is unevenly consumed over time, and early failure of sensor nodes leads to coverage loss, WSNs require dynamic coverage maintenance. Thus, the task of permanently sustaining full coverage is particularly formulated as a hybrid of disjoint set covers and dynamic-coverage-maintenance problems, and both have been proven to be nondeterministic polynomial-complete. In this paper, a hybrid memetic framework for coverage optimization (Hy-MFCO) is presented to cope with the hybrid problem using two major components: 1) a memetic algorithm (MA)-based scheduling strategy and 2) a heuristic recursive algorithm (HRA). First, the MA-based scheduling strategy adopts a dynamic chromosome structure to create disjoint sets, and then the HRA is utilized to compensate the loss of coverage by awaking some of the hibernated nodes in local regions when a disjoint set fails to maintain full coverage. The results obtained from real-world experiments using a WSN test-bed and computer simulations indicate that the proposed Hy-MFCO is able to maximize sensing coverage while achieving energy efficiency at the same time. Moreover, the results also show that the Hy-MFCO significantly outperforms the existing methods with respect to coverage preservation and energy efficiency.
Using Modern Methodologies with Maintenance Software
NASA Technical Reports Server (NTRS)
Streiffert, Barbara A.; Francis, Laurie K.; Smith, Benjamin D.
2014-01-01
Jet Propulsion Laboratory uses multi-mission software produced by the Mission Planning and Sequencing (MPS) team to process, simulate, translate, and package the commands that are sent to a spacecraft. MPS works under the auspices of the Multi-Mission Ground Systems and Services (MGSS). This software consists of nineteen applications that are in maintenance. The MPS software is classified as either class B (mission critical) or class C (mission important). The scheduling of tasks is difficult because mission needs must be addressed prior to performing any other tasks and those needs often spring up unexpectedly. Keeping track of the tasks that everyone is working on is also difficult because each person is working on a different software component. Recently the group adopted the Scrum methodology for planning and scheduling tasks. Scrum is one of the newer methodologies typically used in agile development. In the Scrum development environment, teams pick their tasks that are to be completed within a sprint based on priority. The team specifies the sprint length usually a month or less. Scrum is typically used for new development of one application. In the Scrum methodology there is a scrum master who is a facilitator who tries to make sure that everything moves smoothly, a product owner who represents the user(s) of the software and the team. MPS is not the traditional environment for the Scrum methodology. MPS has many software applications in maintenance, team members who are working on disparate applications, many users, and is interruptible based on mission needs, issues and requirements. In order to use scrum, the methodology needed adaptation to MPS. Scrum was chosen because it is adaptable. This paper is about the development of the process for using scrum, a new development methodology, with a team that works on disparate interruptible tasks on multiple software applications.
Expert system for maintenance management of a boiling water reactor power plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hong Shen; Liou, L.W.; Levine, S.
1992-01-01
An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, whichmore » must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components.« less
NASA Technical Reports Server (NTRS)
DeRoshia, Charles W.; Colletti, Laura C.; Mallis, Melissa M.
2008-01-01
This study assessed human adaptation to a Mars sol by evaluating sleep metrics obtained by actigraphy and subjective responses in 22 participants, and circadian rhythmicity in locomotor activity in 9 participants assigned to Mars Exploration Rover (MER) operational work schedules (24.65 hour days) at the Jet Propulsion Laboratory in 2004. During MER operations, increased work shift durations and reduced sleep durations and time in bed were associated with the appearance of pronounced 12-hr (circasemidian) rhythms with reduced activity levels. Sleep duration, workload, and circadian rhythm stability have important implications for adaptability and maintenance of operational performance not only of MER operations personnel but also in space crews exposed to a Mars sol of 24.65 hours during future Mars missions.
Use of the Equity Implementation Model to Review Clinical System Implementation Efforts
Lauer, Thomas W.; Joshi, Kailash; Browdy, Thomas
2000-01-01
This paper presents the equity implementation model (EIM) in the context of a case that describes the implementation of a medical scheduling system. The model is based on equity theory, a well-established theory in the social sciences that has been tested in hundreds of experimental and field studies. The predictions of equity theory have been supported in organizational, societal, family, and other social settings. Thus, the EIM helps provide a theory-based understanding for collecting and reviewing users' reactions to, and acceptance or rejection of, a new technology or system. The case study (implementation of a patient scheduling and appointment setting system in a large health maintenance organization) illustrates how the EIM can be used to examine users' reactions to the implementation of a new system. PMID:10641966
Lack of effect of habenula lesion on heroin self-administration in rats.
Wang, Yuhong; Zhang, Fuqiang; Tang, Shuaien; Lai, Miaojun; Hao, Wei; Zhang, Yong; Yang, Jianli; Zhou, Wenhua
2009-09-18
We examined the effects of bilateral electric lesion of the habenula (Hb) on the acquisition and maintenance of heroin self-administration. The rats were trained to self-administer heroin (0.05 mg/kg/infusion) under FR1 schedule in daily 4h sessions. A progressive ratio schedule (PR3-4) was used to evaluate the relative motivational value of heroin reinforcement. Compared with the controls, neither pre-training nor post-training of Hb lesions had any effects on the total amount of infusions and motivational value of heroin reward. However, pre-training Hb lesion caused transient active and inactive nose-poke responding in the early phase of training, suggesting increased locomotor exploration. The results suggest that Hb might not play an important role in mediating the acute reinforcing effect of heroin.
LOGAM (Logistic Analysis Model). Volume 3. Technical/Programmer Manual.
1982-08-01
ADDRESS(If different from Controlling Office) 15. SECURITY CLASS. (of this report) UNCLASS IF I ED IS. DECL ASSI FICATI ON/ DOWNGRADING SCHEDULE 16...It different from Report) S0. SUPPLEMENTARY NOTES It. KEY WOROS (Continue an rvereoe side It necesary end identify by block numiber) Logistics... different even though the concepts developed have the same support levels. For example, lets assume one wants to model a typical 4 level maintenance concept
2013-02-01
distribution managemen t operations to include managing cargo distribution functions such as receiving, inspecting, tracing, tracking, packaging, and...Production Management DE CDE ABCDEFG Scheduling DE ADEF ABCDEF T ie r 2 Flightline Operations E BDE Systems Engineering D ABDEG Table 19: 21R...logistics units/ elements and as members of general or executive s t affs in t he operating forces, supporting establishment, and joint staffs . They
An overview of the artificial intelligence and expert systems component of RICIS
NASA Technical Reports Server (NTRS)
Feagin, Terry
1987-01-01
Artificial Intelligence and Expert Systems are the important component of RICIS (Research Institute and Information Systems) research program. For space applications, a number of problem areas that should be able to make good use of the above tools include: resource allocation and management, control and monitoring, environmental control and life support, power distribution, communications scheduling, orbit and attitude maintenance, redundancy management, intelligent man-machine interfaces and fault detection, isolation and recovery.
REMR (Repair, Evaluation, Maintenance, and Rehabilitation) Research Program Development Report.
1983-02-01
that can halt fur- ther damage. Cases where rock reinforcement has been used to limit dis- tress will be evaluated to examine the effectiveness of the...Corps to perform its REMR activities in a rapid, quality- oriented, and cost- effective manner. b. Increase the service life of all Civil Works projects...environmental effects of REMR and development of an operations management system to provide guidance on scheduling REMR activities. REMR Terminology The
Historic Properties Report: Volunteer Army Ammunition Plant, Chattanooga, Tennessee.
1984-08-01
on file at AMCCOM Historcal Office. 3. Building use was determined by government category code; some support structures, such as change houses in the...preservation program to be carried out for the property. It should include a maintenance and repair schedule and estimated initial and annual costs . The...and estimated initial and annual costs . The preservation plan should be approved by the State Historic Preservation Officer and the Advisory Council in
Military Free Fall Scheduling And Manifest Optimization Model
2016-12-01
engines running waiting for the next student load. The annual blade hour cost, which consists of fuel, maintenance, and personnel, is $5.6M for FY-16...tarmac with engines running waiting for the next student load (J. Enke, personal communication, 2016). The annual blade hour cost, which consists of...33 Scenario 2 Nonstandard Run #1 C-27 Two Passes per Lift .......................34 Table 9. xii THIS PAGE INTENTIONALLY LEFT BLANK xiii
Receiver For Solar Air Turbine
NASA Technical Reports Server (NTRS)
Kofal, A.; Shannon, R.; Zimmerman, D. K.
1985-01-01
Solar receiver heats air to temperature high enough to drive gas turbine. Receiver has thermal output of about 70 kilowatts. Pointing downward at focal position of solar reflector, proposed receiver accepts intense concentrated sunlight. Although temperatures in receiver may rise to 1,500 degrees F (816 degrees C) or more, calculations show receiver loses less than 10 percent of insolation by convection through aperture. Receiver designed for 30-year life without scheduled maintenance or replacement.
2000-12-06
KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. Looking over an OSTEO experiment are Mission Specialist Laurel Clark (left) and Commander Rick d. Husband. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. Looking over an OSTEO experiment are Mission Specialist Laurel Clark (left) and Commander Rick d. Husband. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
Electronic Design Automation (EDA) Roadmap Taskforce Report, Design of Microprocessors
1999-04-01
through on time. Hence, the study is not a crystal-ball- gazing exercise, but a rigorous, schedulable plan of action to attain the goal. NTRS97...formats so as not to impose too heavy a maintenance burden on their users Object Interfaces eliminate these problems: • A tool that binds the interface ...and User Interface - Design Tool Communication - EDA System Extension Language - EDA Standards- Based Software Development Environment - Design and
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
Linnehan and Foreman on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006787 (15/16 March 2008) --- Astronauts Mike Foreman and Rick Linnehan (partially out of frame), both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Liping; Hong, Tianzhen
Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensorsmore » used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.« less
Constraint Maintenance with Preferences and Underlying Flexible Solution
NASA Technical Reports Server (NTRS)
Bresina, John; Jonsson, Ari; Morris, Paul; Rajan, Kanna
2003-01-01
This paper describes an aspect of the constraint reasoning mechanism. that is part of a ground planning system slated to be used for the Mars Exploration Rovers mission, where two rovers are scheduled to land on Mars in January of 2003. The planning system combines manual planning software from JPL with an automatic planning/scheduling system from NASA Ames Research Center, and is designed to be used in a mixed-initiative mode. Among other things, this means that after a plan has been produced, the human operator can perform extensive modifications under the supervision of the automated. system. For each modification to an activity, the automated system must adjust other activities as needed to ensure that constraints continue to be satisfied. Thus, the system must accommodate change in an interactive setting. Performance is of critical importance for interactive use. This is achieved by maintaining an underlying flexible solution to the temporal constraints, while the system presents a fixed schedule to the user. Adjustments are then a matter of constraint propagation rather than completely re-solving the problem. However, this begs the important question of which fixed schedule (among the ones sanctioned by the underlying flexible solution) should be presented to the user.Our approach uses least-change and other preferences as a prism through which the user views the flexible solution.
NASA Technical Reports Server (NTRS)
Phillips, Dave; Haas, William; Barth, Tim; Benjamin, Perakath; Graul, Michael; Bagatourova, Olga
2005-01-01
Range Process Simulation Tool (RPST) is a computer program that assists managers in rapidly predicting and quantitatively assessing the operational effects of proposed technological additions to, and/or upgrades of, complex facilities and engineering systems such as the Eastern Test Range. Originally designed for application to space transportation systems, RPST is also suitable for assessing effects of proposed changes in industrial facilities and large organizations. RPST follows a model-based approach that includes finite-capacity schedule analysis and discrete-event process simulation. A component-based, scalable, open architecture makes RPST easily and rapidly tailorable for diverse applications. Specific RPST functions include: (1) definition of analysis objectives and performance metrics; (2) selection of process templates from a processtemplate library; (3) configuration of process models for detailed simulation and schedule analysis; (4) design of operations- analysis experiments; (5) schedule and simulation-based process analysis; and (6) optimization of performance by use of genetic algorithms and simulated annealing. The main benefits afforded by RPST are provision of information that can be used to reduce costs of operation and maintenance, and the capability for affordable, accurate, and reliable prediction and exploration of the consequences of many alternative proposed decisions.
NASA Technical Reports Server (NTRS)
Taylor, Edith C.; Ross, Michael
1989-01-01
The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.
Scheduling System Assessment, and Development and Enhancement of Re-engineered Version of GPSS
NASA Technical Reports Server (NTRS)
Loganantharaj, Rasiah; Thomas, Bushrod; Passonno, Nicole
1996-01-01
The objective of this project is two-fold. First to provide an evaluation of a commercially developed version of the ground processing scheduling system (GPSS) for its applicability to the Kennedy Space Center (KSC) ground processing problem. Second, to work with the KSC GPSS development team and provide enhancement to the existing software. Systems reengineering is required to provide a sustainable system for the users and the software maintenance group. Using the LISP profile prototype code developed by the GPSS reverse reengineering groups as a building block, we have implemented the resource deconfliction portion of GPSS in common LISP using its object oriented features. The prototype corrects and extends some of the deficiencies of the current production version, plus it uses and builds on the classes from the development team's profile prototype.
NASA Astrophysics Data System (ADS)
Zhadanovsky, Boris; Sinenko, Sergey
2018-03-01
Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.
Management, Maintenance, and Upkeep of the Baseline COMO III Air Defense Model.
1986-10-20
weapon subsystems. The sensor subsystems include passive, infrared (IR), television, and a nonimaging sensor and observer, typically the vehicle driver...initially scheduled from the enter game event (DGO) and is rescheduled on a cyclic basis. When radar target detection occurs, the optical search process (DG9...one search cycle in elevation by the track radar/gunner’s optics . DG1 constantly monitors the radar surveillance search volume and when a higher
1988-08-31
behavior/operational goals so tnat corrective action may be taken. Data produced by the IS activities form the basis for design/--1pport trade-offs while...rt7L:EC T Ef Approved for public release; distribution unlimited c R SOUTHWEST RESEARCH INSTITUTE SAN ANTONIO HOUSTON I SECURITY CLASSIFICATION OF THIS...DISTRIBUTION/AVAILABLITY OF REPORT Approved for public release; 2b. DECLASSIFICATION I DOWNGRADING SCHEDULE distribution unlimited 4 PERFORMING ORGANIZATION
2008-02-13
S122-E-008221 (13 Feb. 2008) --- European Space Agency (ESA) astronaut Hans Schlegel, STS-122 mission specialist, works on the new Columbus laboratory as he participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 45-minute spacewalk, among other tasks, Schlegel and NASA astronaut Rex Walheim (out of frame), mission specialist, worked to replace a nitrogen tank used to pressurize the station's ammonia cooling system.
Expedition Seven CDR Malenkenko performs IFM on Condensate Water Processor
2003-07-03
ISS007-E-09229 (3 July 2003) --- Cosmonaut Yuri I. Malenchenko, Expedition 7 mission commander, performs scheduled in-flight maintenance (IFM) on the condensate water processor (SRV-K2M) by removing and replacing its BKO multifiltration/purification column unit, which has reached its service life limit (450 liters min.). The old unit will be discarded on Progress. The IFM took place in the Zvezda Service Module on the International Space Station (ISS). Malenchenko represents Rosaviakosmos.
Expedition Seven CDR Malenkenko performs IFM on Condensate Water Processor
2003-07-03
ISS007-E-09231 (3 July 2003) --- Cosmonaut Yuri I. Malenchenko, Expedition 7 mission commander, performs scheduled in-flight maintenance (IFM) on the condensate water processor (SRV-K2M) by removing and replacing its BKO multifiltration/purification column unit, which has reached its service life limit (450 liters min.). The old unit will be discarded on Progress. The IFM took place in the Zvezda Service Module on the International Space Station (ISS). Malenchenko represents Rosaviakosmos.
2000-12-07
KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training at SPACEHAB, in Cape Canaveral, Fla., the STS-107 crew learns about Biological Research in Canisters (BRIC) experiments that will be on their mission. Seen looking over paperwork and one of the BRIC experiments are Commander Rick D. Husband (left) and Payload Specialist Ilan Ramon of Israel. STS-107 will carry a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-07
KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew are taking part in In-Flight Maintenance training. Payload Specialist Ilan Ramon of Israel, project engineer April Boody, Commander Rick D. Husband and Mission Specialist Laurel Clark look over a Biotube experiment. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-07
KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training at SPACEHAB, in Cape Canaveral, Fla., the STS-107 crew learns about Biological Research in Canisters (BRIC) experiments that will be on their mission. Seen looking over paperwork and one of the BRIC experiments are Commander Rick D. Husband (left) and Payload Specialist Ilan Ramon of Israel. STS-107 will carry a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-07
KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew are taking part in In-Flight Maintenance training. Payload Specialist Ilan Ramon of Israel, project engineer April Boody, Commander Rick D. Husband and Mission Specialist Laurel Clark look over a Biotube experiment. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2006-03-01
factors that “maximize the benefit of location to the firm” ( Heizer & Render , 2004:302-307). In the book, Facility Location: Applications and Theory...Fylstra, D., Lasdon, L., Watson, J. and Waren, A. “Design and Use of the Microsoft Excel Solver,” Interfaces, 28(5):29-55, 1998. Heizer , Jay...and Render , Barry. Principles of Operations Management (5th ed.). New Jersey: Pearson Education Inc., 2004. Hofstra University. (n.d.). Von
Improving Standoff Bombing Capacity in the Face of Anti-Access Area Denial Threats
2015-02-01
potential U.S. adversaries possess or are in the process of acquiring these so-called advanced anti-access/area denial (A2/AD) defense systems, defined in...due to some aircraft being not mission capable due to scheduled and unscheduled maintenance. xiv Air Force is in the process of developing a...Timson, and Christopher Mouton. They were invaluable to me and provided me with incredible support throughout the entire research process . Jim was an
Innovative Corrosion-Resistant Coatings for Heat Distribution Piping at Fort Jackson
2007-06-01
installations are served by district heat distribution sys- tems (HDSs) that provide space heating and hot water to the facilities. HDSs are large, complex...corrosive to exposed steel. Furthermore, water tends to infiltrate the manhole from outside or though pinhole leaks in pipes. When water collects in the man...energized. A typical HDS services a number of installa- tion customers all year for both space heating and domestic hot water . Scheduled maintenance is
Maintenance Management Information and Control System (MMICS). Administrative Boon or Burden.
1984-03-01
training schools (fundamentals and theory ) for the particular career field; through correspondence courses developed and written by the Air Force, and...are identified, scheduled and done on a timely basis. 6 "The administration of an individual’s Upgrade Training ( UGT ) to meet the job knowledge and...formal OJT must study and complete a Career Develop- ment Course (CDC) as part of their upgrade training ( UGT ). The progress and status of the course is
2002-08-30
KENNEDY SPACE CENTER, FLA. -- The final Jacking, Equalization and Leveling (JEL) cylinder is moved to Crawler Transporter No. 2 (CT-2) for installation. During recent routine maintenance inspections, cracks were found on four bearings in two JEL cylinders. Further eddy current inspections indicated that cracks were present on 15 bearings. There are 16 cylinders and 32 bearings per crawler. CT-2 was repaired in order to enable Atlantis' rollout for mission STS-112, scheduled for launch no earlier than Oct. 2.
Automated wind load characterization of wind turbine structures by embedded model updating
NASA Astrophysics Data System (ADS)
Swartz, R. Andrew; Zimmerman, Andrew T.; Lynch, Jerome P.
2010-04-01
The continued development of renewable energy resources is for the nation to limit its carbon footprint and to enjoy independence in energy production. Key to that effort are reliable generators of renewable energy sources that are economically competitive with legacy sources. In the area of wind energy, a major contributor to the cost of implementation is large uncertainty regarding the condition of wind turbines in the field due to lack of information about loading, dynamic response, and fatigue life of the structure expended. Under favorable circumstances, this uncertainty leads to overly conservative designs and maintenance schedules. Under unfavorable circumstances, it leads to inadequate maintenance schedules, damage to electrical systems, or even structural failure. Low-cost wireless sensors can provide more certainty for stakeholders by measuring the dynamic response of the structure to loading, estimating the fatigue state of the structure, and extracting loading information from the structural response without the need of an upwind instrumentation tower. This study presents a method for using wireless sensor networks to estimate the spectral properties of a wind turbine tower loading based on its measured response and some rudimentary knowledge of its structure. Structural parameters are estimated via model-updating in the frequency domain to produce an identification of the system. The updated structural model and the measured output spectra are then used to estimate the input spectra. Laboratory results are presented indicating accurate load characterization.
Linking better shiftwork arrangements with safety and health management systems.
Kogi, Kazutaka
2004-12-01
Various support measures useful for promoting joint change approaches to the improvement of both shiftworking arrangements and safety and health management systems were reviewed. A particular focus was placed on enterprise-level risk reduction measures linking working hours and management systems. Voluntary industry-based guidelines on night and shift work for department stores and the chemical, automobile and electrical equipment industries were examined. Survey results that had led to the compilation of practicable measures to be included in these guidelines were also examined. The common support measures were then compared with ergonomic checkpoints for plant maintenance work involving irregular nightshifts. On the basis of this analysis, a new night and shift work checklist was designed. Both the guidelines and the plant maintenance work checkpoints were found to commonly cover multiple issues including work schedules and various job-related risks. This close link between shiftwork arrangements and risk management was important as shiftworkers in these industries considered teamwork and welfare services to be essential for managing risks associated with night and shift work. Four areas found suitable for participatory improvement by managers and workers were work schedules, ergonomic work tasks, work environment and training. The checklist designed to facilitate participatory change processes covered all these areas. The checklist developed to describe feasible workplace actions was suitable for integration with comprehensive safety and health management systems and offered valuable opportunities for improving working time arrangements and job content together.
Challenges in sensor development for the electric utility industry
NASA Astrophysics Data System (ADS)
Ward, Barry H.
1999-01-01
The electric utility industry is reducing operating costs in order to prepare for deregulation. The reduction in operating cost has meant a reduction in manpower. The ability to utilize remaining maintenance staff more effectively and to stay competitive in a deregulated environment has therefore become critical. In recent years, the industry has moved away from routine or periodic maintenance to predictive or condition based maintenance. This requires the assessment of equipment condition by frequent testing and inspection; a requirement that is incompatible with cost reduction. To overcome this dilemma, industry trends are toward condition monitoring, whereby the health of apparatus is monitored continuously. This requires the installation of sensors hr transducers on power equipment and the data taken forwarded to an intelligent device for further processing. These devices then analyze the data and make evaluations based on parameter levels or trends, in an attempt to predict possible deterioration. This continuous monitoring allows the electric utility to schedule maintenance on an as needed basis. The industry has been faced with many challenges in sensor design. The measurement of physical, chemical and electrical parameters under extreme conditions of electric fields, magnetic fields, temperature, corrosion, etc. is extensive. This paper will give an overview of these challenges and the solutions adopted for apparatus such as power transformers, circuit breakers, boilers, cables, batteries, and rotating machinery.
NASA Astrophysics Data System (ADS)
Siswanto, A.; Kurniati, N.
2018-04-01
An oil and gas company has 2,268 oil and gas wells. Well Barrier Element (WBE) is installed in a well to protect human, prevent asset damage and minimize harm to the environment. The primary WBE component is Surface Controlled Subsurface Safety Valve (SCSSV). The secondary WBE component is Christmas Tree Valves that consist of four valves i.e. Lower Master Valve (LMV), Upper Master Valve (UMV), Swab Valve (SV) and Wing Valve (WV). Current practice on WBE Preventive Maintenance (PM) program is conducted by considering the suggested schedule as stated on manual. Corrective Maintenance (CM) program is conducted when the component fails unexpectedly. Both PM and CM need cost and may cause production loss. This paper attempts to analyze the failure data and reliability based on historical data. Optimal PM interval is determined in order to minimize the total cost of maintenance per unit time. The optimal PM interval for SCSSV is 730 days, LMV is 985 days, UMV is 910 days, SV is 900 days and WV is 780 days. In average of all components, the cost reduction by implementing the suggested interval is 52%, while the reliability is improved by 4% and the availability is increased by 5%.
NASA Technical Reports Server (NTRS)
1978-01-01
Lake To Lake Dairy Cooperative, Manitowoc, Wisconsin, operates four plants in Wisconsin for processing milk, butter and cheese products from its 1,300 member farms. The large co-op was able to realize substantial savings by using NASA information for improved efficiency in plant maintenance. Under contract to Marshall Space Flight Center, Midwest Research Institute compiled a handbook consolidating information about commercially available lubricants. The handbook details chemical and physical properties, applications, specifications, test procedures and test data for liquid and solid lubricants. Lake To Lake's plant engineer used the handbook to effect savings in maintenance labor and materials costs by reducing the number of lubricants used on certain equipment. Strict U.S. Department of Agriculture and Food and Drug Administration regulations preclude lubrication changes n production equipment, but the co-op's maintenance chief was able to eliminate seven types of lubricants for ancillary equipment, such as compressors and high pressure pumps. Handbook data enabled him to select comparable but les expensive lubricants in the materials consolidation process, and simplified lubrication schedules and procedures. The handbook is in continuing use as a reference source when a new item of equipment is purchased.
Space shuttle low cost/risk avionics study
NASA Technical Reports Server (NTRS)
1971-01-01
All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.
Linnehan and Foreman on EVA 2 - during Expedition 16 / STS-123 Joint Operations
2008-03-16
S123-E-006786 (15/16 March 2008) --- Astronaut Rick Linnehan, STS-123 mission specialist, participates in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and astronaut Mike Foreman (out of frame), mission specialist, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System. The blackness of space and Earth's horizon provide the backdrop for the scene.
Linnehan and Foreman on EVA 2 during STS-123 / Expedition 16 Joint Operations
2008-03-16
S123-E-006400 (15/16 March 2008) --- Astronauts Rick Linnehan and Mike Foreman, both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System. The blackness of space and Earth's horizon provide the backdrop for the scene.
Linnehan and Foreman on EVA 2 during STS-123 / Expedition 16 Joint Operations
2008-03-16
S123-E-006403 (15/16 March 2008) --- Astronauts Rick Linnehan and Mike Foreman, both STS-123 mission specialists, participate in the mission's second scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 7-hour, 8-minute spacewalk, Linnehan and Foreman, assembled the stick-figure-shaped Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM), a task that included attaching its two arms. Designed for station maintenance and service, Dextre is capable of sensing forces and movement of objects it is manipulating. It can automatically compensate for those forces and movements to ensure an object is moved smoothly. Dextre is the final element of the station's Mobile Servicing System. The blackness of space and Earth's horizon provide the backdrop for the scene.
Barret, Scott T; Bevins, Rick A
2013-12-01
Nicotine enhancement of reward has been implicated as an important contributor to tobacco addiction. Despite the attention that reward enhancement has received, the behavioral mechanisms whereby nicotine enhances operant responding remain largely unknown. The present study sought to extend previous work by evaluating the effects of nicotine on responding for two qualitatively different rewards (visual stimulation (VS) and 4% sucrose solution) under fixed-ratio (FR) maintenance and extinction conditions. Sprague–Dawley rats were trained to press an active lever for VS (Experiment 1) or 4% sucrose solution (Experiment 2) and evaluated over 15 sessions on a FR5 schedule of reinforcement. Nicotine (0.4 mg base/kg, SC) or saline were administered 5 min before each session; the alternate solution was given in the home cage after the session. The effects of nicotine on extinction responding were then assessed over 5 sessions and rats were divided into 4 groups based on drug of injection received during FR-maintenance and extinction phases (maintenance–extinction): Nic–Nic, Nic–Sal, Sal–Sal, and Sal–Nic. Nicotine increased active lever response rates for both VS and 4% sucrose under FR5 maintenance conditions. Nicotine also increased response rates in the Nic–Nic group relative to all other groups under extinction conditions in both experiments, though this effect had greater longevity following VS maintenance conditions than sucrose. Enhancement of responding during extinction does not appear dependent upon locomotor activation by nicotine.
Eldem, İrem; Yavuz, Duygu; Cumaoğullari, Özge; İleri, Talia; Ünal İnce, Elif; Ertem, Mehmet; Doğanay Erdoğan, Beyza; Bindak, Recep; Özdağ, Hilal; Şatiroğlu-Tufan, N Lale; Uysal, L Zümrüt
2018-04-20
Therapy discontinuations and toxicities occur because of significant interindividual variations in 6-mercaptopurine (6-MP) and methotrexate (MTX) response during maintenance therapy of childhood acute lymphoblastic leukemia (ALL). 6-MP/MTX intolerance in some of the patients cannot be explained by thiopurine S-methyl transferase (TPMT) gene variants. In this study, we aimed to investigate candidate pharmacogenetic determinants of 6-MP and MTX intolerance in Turkish ALL children. In total, 48 children with ALL who had completed or were receiving maintenance therapy according to Children's Oncology Group (COG) protocols were enrolled. Fifteen single-nucleotide polymorphisms in 8 candidate genes that were related to drug toxicity or had a role in the 6-MP/MTX metabolism (TPMT, ITPA, MTHFR, IMPDH2, PACSIN2, SLCO1B1, ABCC4, and PYGL) were genotyped by competitive allele-specific PCR (KASP). Drug doses during maintenance therapy were modified according to the protocol. The median drug dose intensity was 50% (28% to 92%) for 6-MP and 58% (27% to 99%) for MTX in the first year of maintenance therapy, which were lower than that scheduled in all patients. Among the analyzed polymorphisms, variant alleles in SLCO1B1 rs4149056 and rs11045879 were found to be associated with lower 6-MP/MTX tolerance. SLCO1B1 rs4149056 and rs11045879 polymorphisms may be important genetic markers to individualize 6-MP/MTX doses.
Carbon emission and sequestration of urban turfgrass systems in Hong Kong.
Kong, Ling; Shi, Zhengjun; Chu, L M
2014-03-01
Climate change is more than just a global issue. Locally released carbon dioxide may lead to a rise in global ambient temperature and influence the surrounding climate. Urban greenery may mitigate this as they can remove carbon dioxide by storing carbon in substrates and vegetation. On the other hand, urban greenery systems which are under intense management and maintenance may contribute to the emission of carbon dioxide or other greenhouse gases. The impact of urban greenery on carbon balance in major metropolitan areas thus remains controversial. We investigated the carbon footprints of urban turf operation and maintenance by conducting a research questionnaire on different Hong Kong turfs in 2012, and showed that turf maintenance contributed 0.17 to 0.63 kg Ce m(-2)y(-1) to carbon emissions. We also determined the carbon storage of turfs at 0.05 to 0.21 kg C m(-2) for aboveground grass biomass and 1.26 to 4.89 kg C m(-2) for soils (to 15 cm depth). We estimated that the carbon sink capacity of turfs could be offset by carbon emissions in 5-24 years under current management patterns, shifting from carbon sink to carbon source. Our study suggested that maintenance management played a key role in the carbon budget and footprint of urban greeneries. The environmental impact of turfgrass systems can be optimized by shifting away from empirically designed maintenance schedules towards rational ones based on carbon sink and emission principles. Copyright © 2014 Elsevier B.V. All rights reserved.
JEL Cylinder is moved into Crawler Transporter No. 2
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. -- The final Jacking, Equalization and Leveling (JEL) cylinder is moved to Crawler Transporter No. 2 (CT-2) for installation. During recent routine maintenance inspections, cracks were found on four bearings in two JEL cylinders. Further eddy current inspections indicated that cracks were present on 15 bearings. There are 16 cylinders and 32 bearings per crawler. CT-2 was repaired in order to enable Atlantis' rollout for mission STS-112, scheduled for launch no earlier than Oct. 2.
JEL Cylinder is moved into Crawler Transporter No. 2
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. -- Workers help guide the final Jacking, Equalization and Leveling (JEL) cylinder into place on Crawler Transporter No. 2 (CT-2) for installation. During recent routine maintenance inspections, cracks were found on four bearings in two JEL cylinders. Further eddy current inspections indicated that cracks were present on 15 bearings. There are 16 cylinders and 32 bearings per crawler. CT-2 was repaired in order to enable Atlantis' rollout for mission STS-112, scheduled for launch no earlier than Oct. 2.
2013-12-01
varnishes and hard carbon deposits in various parts of the fuel system and are commonly referred to as coke or fouling. Depending upon the temperature...this coke . Coke present in an aircraft system, particularly the engine, lowers the on-wing time of engines and can result in significant damage to...engine hot section components. Even with proper scheduled maintenance, the presence of coke in any part of the aircraft or engine system has a
2000-12-07
KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialists David M. Brown (center) and Michael Anderson (right) get information about one of the Biological Research in Canisters (BRIC) experiments that will be on their mission. At left is Payload Specialist Ilan Ramon of Israel. The crew has been taking part in In-Flight Maintenance training at SPACEHAB, in Cape Canaveral, Fla., for their mission. STS-107 will carry a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-07
KENNEDY SPACE CENTER, FLA. -- STS-107 Mission Specialists David M. Brown (center) and Michael Anderson (right) get information about one of the Biological Research in Canisters (BRIC) experiments that will be on their mission. At left is Payload Specialist Ilan Ramon of Israel. The crew has been taking part in In-Flight Maintenance training at SPACEHAB, in Cape Canaveral, Fla., for their mission. STS-107 will carry a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
A Descriptive Evaluation of Automated Software Cost-Estimation Models,
1986-10-01
Version 1.03D) * PCOC (Version 7.01) - PRICE S • SLIM (Version 1.1) • SoftCost (Version 5. 1) * SPQR /20 (Version 1. 1) - WICOMO (Version 1.3) These...produce detailed GANTT and PERT charts. SPQR /20 is based on a cost model developed at ITT. In addition to cost, schedule, and staffing estimates, it...cases and test runs required, and the effectiveness of pre-test and test activities. SPQR /20 also predicts enhancement and maintenance activities. C
NASA Technical Reports Server (NTRS)
Webb, J. T.
1988-01-01
A new approach to the training, certification, recertification, and proficiency maintenance of the Shuttle launch team is proposed. Previous training approaches are first reviewed. Short term program goals include expanding current training methods, improving the existing simulation capability, and scheduling training exercises with the same priority as hardware tests. Long-term goals include developing user requirements which would take advantage of state-of-the-art tools and techniques. Training requirements for the different groups of people to be trained are identified, and future goals are outlined.
2000-12-07
KENNEDY SPACE CENTER, FLA. -- During In-Flight Maintenance training, STS-107 Mission Specialist Michael Anderson looks over a “Medusa,” a piece of a Biotube experiment that will be on the STS-107 mission. The Medusa is part of a watering system for plants. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-07
KENNEDY SPACE CENTER, FLA. -- During In-Flight Maintenance training, STS-107 Mission Specialist Michael Anderson looks over a “Medusa,” a piece of a Biotube experiment that will be on the STS-107 mission. The Medusa is part of a watering system for plants. As a research mission, STS-107 will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-05
KENNEDY SPACE CENTER, Fla. -- STS-107 crew members take part in In-Flight Maintenance training for their mission. Under the watchful eyes of SPACEHAB trainer David Butler (left), Payload Specialist Ilan Ramon of Israel (center) and Mission Specialist David M. Brown (right) check equipment and paperwork inside the SPACEHAB Double Module. Research mission STS-107, scheduled to launch July 19, 2001, will carry the SPACEHAB Double Module in its first flight into space and a broad collection of experiments ranging from material science to life science
2000-12-05
KENNEDY SPACE CENTER, Fla. -- STS-107 crew members take part in In-Flight Maintenance training for their mission. Under the watchful eyes of SPACEHAB trainer David Butler (left), Payload Specialist Ilan Ramon of Israel (center) and Mission Specialist David M. Brown (right) check equipment and paperwork inside the SPACEHAB Double Module. Research mission STS-107, scheduled to launch July 19, 2001, will carry the SPACEHAB Double Module in its first flight into space and a broad collection of experiments ranging from material science to life science
2000-12-05
KENNEDY SPACE CENTER, Fla. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. One of the payload elements on the mission is the SPACEHAB Double Module in its first research flight into space. Working with equipment inside the SPACEHAB Double Module are (left to right) Commander Rick D. Husband, Payload Specialist Ilan Ramon of Israel and Pilot William C. "Willie" McCool , while SPACEHAB trainer David Butler (standing) looks on. Research mission STS-107 is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, Fla. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. One of the payload elements on the mission is the SPACEHAB Double Module in its first research flight into space. Working with equipment inside the SPACEHAB Double Module are (left to right) SPACEHAB trainer David Butler, Pilot William C. “Willie” McCool, Commander Rick D. Husband, and Payload Specialist Ilan Ramon, from Israel. Research mission STS-107 is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, Fla. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. One of the payload elements on the mission is the SPACEHAB Double Module in its first research flight into space. Working with equipment inside the SPACEHAB Double Module are (front) Payload Specialist Ilan Ramon (left), astronaut from Israel, and Commander Rick D. Husband; (back) Mission Specialist David Brown, SPACEHAB trainer David Butler, and Pilot William C. “Willie” McCool. Research mission STS-107 is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, Fla. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. One of the payload elements on the mission is the SPACEHAB Double Module in its first research flight into space. Working with equipment inside the SPACEHAB Double Module are (front) Payload Specialist Ilan Ramon (left), astronaut from Israel, and Commander Rick D. Husband; (back) Mission Specialist David Brown, SPACEHAB trainer David Butler, and Pilot William C. “Willie” McCool. Research mission STS-107 is scheduled to launch July 19, 2001
2000-12-05
KENNEDY SPACE CENTER, Fla. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. One of the payload elements on the mission is the SPACEHAB Double Module in its first research flight into space. Working with equipment inside the SPACEHAB Double Module are (left to right) Commander Rick D. Husband, Payload Specialist Ilan Ramon of Israel and Pilot William C. "Willie" McCool , while SPACEHAB trainer David Butler (standing) looks on. Research mission STS-107 is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, Fla. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. One of the payload elements on the mission is the SPACEHAB Double Module in its first research flight into space. Working with equipment inside the SPACEHAB Double Module are (left to right) SPACEHAB trainer David Butler, Pilot William C. “Willie” McCool, Commander Rick D. Husband, and Payload Specialist Ilan Ramon, from Israel. Research mission STS-107 is scheduled to launch July 19, 2001
El Bunduq field ready for start-up. [United Arab Emirates
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-10-05
Production is scheduled to restart on the El Bunduq field. The oil field was first brought onstream in 1975 but was shut-in during 1979 due to excessive gas production. Since then, the operator, Bunduq Co., has been developing a $330-million pressure maintenance program to contain gas production and increase oil recovery. While the current field development program is based solely on reserves in the Arab D Formation, the Bunduq Co. has confirmed an oil reservoir in the shallower Arab C Formation.
2002-08-30
KENNEDY SPACE CENTER, FLA. -- Workers help guide the final Jacking, Equalization and Leveling (JEL) cylinder into place on Crawler Transporter No. 2 (CT-2) for installation. During recent routine maintenance inspections, cracks were found on four bearings in two JEL cylinders. Further eddy current inspections indicated that cracks were present on 15 bearings. There are 16 cylinders and 32 bearings per crawler. CT-2 was repaired in order to enable Atlantis' rollout for mission STS-112, scheduled for launch no earlier than Oct. 2.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-09
...The Coast Guard has issued a temporary deviation from the operating schedule that governs the draw of the US 17/George P. Coleman Memorial Swing Bridge across the York River, at mile 7.0, between Gloucester Point and Yorktown, VA. This deviation is necessary to facilitate maintenance on the George P. Coleman Memorial Swing Bridge. This temporary deviation allows the drawbridge to remain in the closed- to-navigation position on specific dates and times.
An Analysis of the United States Naval Aviation Schedule Removal Component (SRC) Card Process
2009-12-01
JSF has the ability to communicate in flight with its maintenance system , ALIS. Its Prognostic Health Management (PHM) System abilities allow it to...end-users. PLCS allows users of the system , through a central database, visibility of a component’s history and lifecycle data . Since both OOMA...used in PLM systems .2 This research recommends a PLM system that is Web-based and uses DoD- mandated UID technology as the future for data
The costs of reducing loss to follow-up in South African cervical cancer screening
Goldhaber-Fiebert, Jeremy D; Denny, Lynette E; De Souza, Michelle; Wright, Thomas C; Kuhn, Louise; Goldie, Sue J
2005-01-01
Background This study was designed to quantify the resources used in reestablishing contact with women who missed their scheduled cervical cancer screening visits and to assess the success of this effort in reducing loss to follow-up in a developing country setting. Methods Women were enrolled in this Cape Town, South Africa-based screening study between 2000 and 2003, and all had scheduled follow-up visits in 2003. Community health worker (CHW) time, vehicle use, maintenance, and depreciation were estimated from weekly logs and cost accounting systems. The percentage of women who attended their scheduled visit, those who attended after CHW contact(s), and those who never returned despite attempted contact(s) were determined. The number of CHW visits per woman was also estimated. Results 3,711 visits were scheduled in 2003. Of these, 2,321 (62.5%) occurred without CHW contact, 918 (24.8%) occurred after contact(s), and 472 (12.7%) did not occur despite contact(s). Loss to follow-up was reduced from 21% to 6%, 39% to 10%, and 50% to 24% for 6, 12, and 24-month visits. CHWs attempted 3,200 contacts in 530 trips. On average, 3 CHWs attempted to contact 6 participants over each 111 minute trip. The per-person cost (2003 Rand) for these activities was 12.75, 24.92, and 40.50 for 6, 12, and 24-month visits. Conclusion CHW contact with women who missed scheduled visits increased their return rate. Cost-effectiveness analyses aimed at policy decisions about cervical cancer screening in developing countries should incorporate these findings. PMID:16288646
Ho, Emily V; Klenotich, Stephanie J; McMurray, Matthew S; Dulawa, Stephanie C
2016-01-01
Anorexia nervosa (AN) is a complex eating disorder with severe dysregulation of appetitive behavior. The activity-based anorexia (ABA) paradigm is an animal model in which rodents exposed to both running wheels and scheduled feeding develop aspects of AN including paradoxical hypophagia, dramatic weight loss, and hyperactivity, while animals exposed to only one condition maintain normal body weight. Brain-derived neurotrophic factor (BDNF), an activity-dependent modulator of neuronal plasticity, is reduced in the serum of AN patients, and is a known regulator of feeding and weight maintenance. We assessed the effects of scheduled feeding, running wheel access, or both on the expression of BDNF transcripts within the mesocorticolimbic pathway. We also assessed the expression of neuronal cell adhesion molecule 1 (NCAM1) to explore the specificity of effects on BDNF within the mesocorticolimbic pathway. Scheduled feeding increased the levels of both transcripts in the hippocampus (HPC), increased NCAM1 mRNA expression in the ventral tegmental area (VTA), and decreased BDNF mRNA levels in the medial prefrontal cortex (mPFC). In addition, wheel running increased BDNF mRNA expression in the VTA. No changes in either transcript were observed in the nucleus accumbens (NAc). Furthermore, no changes in either transcript were induced by the combined scheduled feeding and wheel access condition. These data indicate that scheduled feeding or wheel running alter BDNF and NCAM1 expression levels in specific regions of the mesocorticolimbic pathway. These findings contribute to our current knowledge of the molecular alterations induced by ABA and may help elucidate possible mechanisms of AN pathology.
Inactivated poliovirus vaccine and the final stages of poliovirus eradication.
Hovi, T
2001-03-21
The use of the inactivated poliovirus vaccine (IPV) will increase before and probably also after the global eradication of the wild type poliovirus. Before eradication, the switch from the use of oral poliovirus vaccine (OPV) to IPV has been due to the better safety record of IPV. Introduction of IPV in the regular immunisation schedules is made easier by the development of several combination vaccines, including IPV. Maternal antibodies and young age, often considered problematic for early initiation of IPV schedules, did not compromise optimal maintenance of seropositivity during infancy or long-term persisting antibody levels in our studies. OPV-derived, potentially pathogenic and transmissible poliovirus strains, excreted by some individuals for years, may present a problem for a blunt stopping of all polio immunisations after eradication. Our recent results suggest that locally excreted IgA might have a role in the elimination of poliovirus infection in the intestinal tissues.
Linnehan during Expedition 16/STS-123 EVA 3
2008-03-18
ISS016-E-033024 (17/18 March 2008) --- Astronaut Rick Linnehan, STS-123 mission specialist, uses a digital camera to expose a photo of his helmet visor during the mission's third scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. Also visible in the reflections in the visor are various components of the station, the docked Space Shuttle Endeavour and a blue and white portion of Earth. During the 6-hour, 53-minute spacewalk, Linnehan and astronaut Robert L. Behnken (out of frame), mission specialist, installed a spare-parts platform and tool-handling assembly for Dextre, also known as the Special Purpose Dextrous Manipulator (SPDM). Among other tasks, they also checked out and calibrated Dextre's end effector and attached critical spare parts to an external stowage platform. The new robotic system is scheduled to be activated on a power and data grapple fixture located on the Destiny laboratory on flight day nine.
NASA Astrophysics Data System (ADS)
Zhang, Yunju; Chen, Zhongyi; Guo, Ming; Lin, Shunsheng; Yan, Yinyang
2018-01-01
With the large capacity of the power system, the development trend of the large unit and the high voltage, the scheduling operation is becoming more frequent and complicated, and the probability of operation error increases. This paper aims at the problem of the lack of anti-error function, single scheduling function and low working efficiency for technical support system in regional regulation and integration, the integrated construction of the error prevention of the integrated architecture of the system of dispatching anti - error of dispatching anti - error of power network based on cloud computing has been proposed. Integrated system of error prevention of Energy Management System, EMS, and Operation Management System, OMS have been constructed either. The system architecture has good scalability and adaptability, which can improve the computational efficiency, reduce the cost of system operation and maintenance, enhance the ability of regional regulation and anti-error checking with broad development prospects.
Linnemann, Désirée Larenas; Gupta, Payel; Mithani, Sima; Ponda, Punita
2012-01-01
Background Several practical issues dealing with the exact application of allergen immunotherapy (AIT) among European and US allergists are not well known. Guidelines on AIT give recommendations and suggestions for only some of them. We present this unique survey with worldwide response. Methods The AAAAI immunotherapy committee conducted a web-based practice patterns survey (program: Survey Monkey) among all members in&outside US on dosing, dose-adjustment after missed doses and duration of AIT. Results 1201 Returned questionnaires (almost 25% response rate). 21% were non-US-Canada members. Maintenance doses in USCan are (mean/median): Dermatophagoides farinae (Df) combined with Dermatophagoides pteronyssinus (Dpt): 2155/1000AU; Df solo 2484/1000AU. Dpt when combined with Df 1937/1000AU; Dpt solo: 2183/1000AU.Cat 3224/2000BAU. Grass 11,410/4000BAU. 57-65% of the dosing falls within the recommended Practice Parameters recommended ranges. Non-USCan allergists expressed maintenance doses in many different units making analysis impossible. Dose-adjustment after missed doses is based on ‘time elapsed since the last applied dose’ by 77% of USCan and 58% of non-USCan allergists and on ‘time since missed scheduled dose’ by the rest. Doses are adjusted when a patient comes in more than 14 d/5 wk after the last administration at build-up/maintenance by both USCan and non-USCan colleagues. The mostly followed dose-adjustment schedules after 1, 2, 3 missed doses are: Build-up: repeat last dose, reduce by one dose, reduce by 2 doses; maintenance: reduce by one dose, reduce by 2 doses, reduce by 3 doses. 26% uses a different approach reducing doses by a certain percentage or volume. AIT is restarted after a gap in build-up of >30 days and of >12 weeks during maintenance in both groups (median). Outside USCan AIT is prescribed for 3 years (Median). However, 75% of USCan allergists prescribes AIT for 5 years. Main reasons why to continue AIT beyond 5 years: ‘symptoms came back after stopping’ or “patient afraid to relapse.” Conclusions These results show regional differences on some points (especially AIT duration) and they suggest in which direction to plan further research in 2 areas to establish universal dose-adjustment plans for missed applications and define the usefulness (or lack of) of long-term AIT. Moreover, there is still room for improvement in the way AIT is dosed.
NASA Technical Reports Server (NTRS)
Taylor, J. C.; Robertson, M. M.
1995-01-01
This report describes three years' evaluation of the effects of one airline's Crew Resources Management (CRM) training operation for maintenance. This evaluation focuses on the post-training attitudes of maintenance managers' and technical support professionals, their reported behaviors, and the safety, efficiency and dependable maintenance performance of their units. The results reveal a strong positive effect of the training. The overall program represents the use of CRM training as a long-term commitment to improving performance through effective communication at all levels in airline maintenance operations. The initial findings described in our previous progress reports are reinforced and elaborated here. The current results benefit from the entire pre-post training survey, which now represents total attendance of all managers and staff professionals. Additionally there are now full results from the two-month, six-month, and 12-month follow-up questionnaires, together with as many as 33 months of post-training performance data, using several indicators. In this present report, we examine participants' attitudes, their reported behaviors following the training, the performance of their work units, and the relationships among these variables. Attitudes include those measured immediately before and after the training as well as participants' attitudes months after their training. Performance includes measures, by work units, of on-time flight departures, on-schedule maintenance releases, occupational and aircraft safety, and efficient labor costs. We report changes in these performance measures following training, as well their relationships with the training participants' attitudes. Highlights of results from this training program include increased safety and improved costs associated with positive attitudes about the use of more assertive communication, and the improved management of stress. Improved on-time performance is also related to those improved attitudes, as well as favorable attitudes about participative management.
Simmons, S F; Schnelle, J F
2004-01-01
To evaluate the effects of an exercise and scheduled-toileting intervention on appetite and constipation in nursing home (NH) residents. A controlled, clinical intervention trial with 89 residents in two NHs. Research staff provided exercise and toileting assistance every two hours, four times per day, five days a week for 32 weeks. Oral food and fluid consumption during meals was measured at baseline, eight and 32 weeks. Bowel movement frequency was measured at baseline and 32 weeks. The intervention group showed significant improvements or maintenance across all measures of daily physical activity, functional performance, and strength compared to the control group. Participants in both groups consumed an average of approximately 55% of meals at all three time points (approximately 1100 calories/day) with no change over time in either group. There was also no change in the frequency of bowel movements in either group, which averaged less than one in two days for both groups; and, approximately one-half of all participants had no bowel movement in two days. An exercise and scheduled-toileting intervention alone is not sufficient to improve oral food and fluid consumption during meals and bowel movement frequency in NH residents.
NASA Astrophysics Data System (ADS)
Sembiring, N.; Ginting, E.; Darnello, T.
2017-12-01
Problems that appear in a company that produces refined sugar, the production floor has not reached the level of critical machine availability because it often suffered damage (breakdown). This results in a sudden loss of production time and production opportunities. This problem can be solved by Reliability Engineering method where the statistical approach to historical damage data is performed to see the pattern of the distribution. The method can provide a value of reliability, rate of damage, and availability level, of an machine during the maintenance time interval schedule. The result of distribution test to time inter-damage data (MTTF) flexible hose component is lognormal distribution while component of teflon cone lifthing is weibull distribution. While from distribution test to mean time of improvement (MTTR) flexible hose component is exponential distribution while component of teflon cone lifthing is weibull distribution. The actual results of the flexible hose component on the replacement schedule per 720 hours obtained reliability of 0.2451 and availability 0.9960. While on the critical components of teflon cone lifthing actual on the replacement schedule per 1944 hours obtained reliability of 0.4083 and availability 0.9927.
Research on Operation Assessment Method for Energy Meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng
2018-03-01
The existing electric energy meter rotation maintenance strategy regularly checks the electric energy meter and evaluates the state. It only considers the influence of time factors, neglects the influence of other factors, leads to the inaccuracy of the evaluation, and causes the waste of resources. In order to evaluate the running state of the electric energy meter in time, a method of the operation evaluation of the electric energy meter is proposed. The method is based on extracting the existing data acquisition system, marketing business system and metrology production scheduling platform that affect the state of energy meters, and classified into error stability, operational reliability, potential risks and other factors according to the influencing factors, based on the above basic test score, inspecting score, monitoring score, score of family defect detection. Then, according to the evaluation model according to the scoring, we evaluate electric energy meter operating state, and finally put forward the corresponding maintenance strategy of rotation.
A Method of Evaluating Operation of Electric Energy Meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Li, Tianyang; Cao, Fei; Chu, Pengfei; Zhao, Xinwang; Huang, Rui; Liu, Liping; Zhang, Chenglin
2018-05-01
The existing electric energy meter rotation maintenance strategy regularly checks the electric energy meter and evaluates the state. It only considers the influence of time factors, neglects the influence of other factors, leads to the inaccuracy of the evaluation, and causes the waste of resources. In order to evaluate the running state of the electric energy meter in time, a method of the operation evaluation of the electric energy meter is proposed. The method is based on extracting the existing data acquisition system, marketing business system and metrology production scheduling platform that affect the state of energy meters, and classified into error stability, operational reliability, potential risks and other factors according to the influencing factors, based on the above basic test score, inspecting score, monitoring score, score of family defect detection. Then, according to the evaluation model according to the scoring, we evaluate electric energy meter operating state, and finally put forward the corresponding maintenance strategy of rotation.
State of Arts of Monumental Stones Diagnosis and Monitoring
NASA Astrophysics Data System (ADS)
Tiano, P.; Riminesi, C.
2017-08-01
The conservation and maintenance of a monumental stone building is a complex aim where different disciplines are involved. First step is concerning the determination of the state of conservation of stone material present, than determine its modification on time, as such and after conservation treatments applied on: cleaning, protecting, strengthening. In order to fulfill such objectives suitable parameters must be selected and the most appropriate diagnostic techniques for their quantitative evaluation operated. In this context, the determination of the surface water absorption, moisture content, colour variation and mechanical properties are important parameters for the control, and the monitoring over time, of the state of conservation of the monumental stone surfaces. These parameters are strongly related not only to the stone characteristics but also to the evaluation of products's performance: efficiency and durability. Their rate of variation, determined in monitoring campaigns, is fundamental for elaborate by properly predictive model a schedule maintenance protocol.
ARGES: an Expert System for Fault Diagnosis Within Space-Based ECLS Systems
NASA Technical Reports Server (NTRS)
Pachura, David W.; Suleiman, Salem A.; Mendler, Andrew P.
1988-01-01
ARGES (Atmospheric Revitalization Group Expert System) is a demonstration prototype expert system for fault management for the Solid Amine, Water Desorbed (SAWD) CO2 removal assembly, associated with the Environmental Control and Life Support (ECLS) System. ARGES monitors and reduces data in real time from either the SAWD controller or a simulation of the SAWD assembly. It can detect gradual degradations or predict failures. This allows graceful shutdown and scheduled maintenance, which reduces crew maintenance overhead. Status and fault information is presented in a user interface that simulates what would be seen by a crewperson. The user interface employs animated color graphics and an object oriented approach to provide detailed status information, fault identification, and explanation of reasoning in a rapidly assimulated manner. In addition, ARGES recommends possible courses of action for predicted and actual faults. ARGES is seen as a forerunner of AI-based fault management systems for manned space systems.
Optimized PID control of depth of hypnosis in anesthesia.
Padula, Fabrizio; Ionescu, Clara; Latronico, Nicola; Paltenghi, Massimiliano; Visioli, Antonio; Vivacqua, Giulio
2017-06-01
This paper addresses the use of proportional-integral-derivative controllers for regulating the depth of hypnosis in anesthesia by using propofol administration and the bispectral index as a controlled variable. In fact, introducing an automatic control system might provide significant benefits for the patient in reducing the risk for under- and over-dosing. In this study, the controller parameters are obtained through genetic algorithms by solving a min-max optimization problem. A set of 12 patient models representative of a large population variance is used to test controller robustness. The worst-case performance in the considered population is minimized considering two different scenarios: the induction case and the maintenance case. Our results indicate that including a gain scheduling strategy enables optimal performance for induction and maintenance phases, separately. Using a single tuning to address both tasks may results in a loss of performance up to 102% in the induction phase and up to 31% in the maintenance phase. Further on, it is shown that a suitably designed low-pass filter on the controller output can handle the trade-off between the performance and the noise effect in the control variable. Optimally tuned PID controllers provide a fast induction time with an acceptable overshoot and a satisfactory disturbance rejection performance during maintenance. These features make them a very good tool for comparison when other control algorithms are developed. Copyright © 2017 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, Valerie A.; Ogilvie, Alistair B.
2012-01-01
This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis frommore » a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.« less
NASA Astrophysics Data System (ADS)
Echavarria, E.; Tomiyama, T.; van Bussel, G. J. W.
2007-07-01
The objective of this on-going research is to develop a design methodology to increase the availability for offshore wind farms, by means of an intelligent maintenance system capable of responding to faults by reconfiguring the system or subsystems, without increasing service visits, complexity, or costs. The idea is to make use of the existing functional redundancies within the system and sub-systems to keep the wind turbine operational, even at a reduced capacity if necessary. Re-configuration is intended to be a built-in capability to be used as a repair strategy, based on these existing functionalities provided by the components. The possible solutions can range from using information from adjacent wind turbines, such as wind speed and direction, to setting up different operational modes, for instance re-wiring, re-connecting, changing parameters or control strategy. The methodology described in this paper is based on qualitative physics and consists of a fault diagnosis system based on a model-based reasoner (MBR), and on a functional redundancy designer (FRD). Both design tools make use of a function-behaviour-state (FBS) model. A design methodology based on the re-configuration concept to achieve self-maintained wind turbines is an interesting and promising approach to reduce stoppage rate, failure events, maintenance visits, and to maintain energy output possibly at reduced rate until the next scheduled maintenance.
Waning of vaccine-induced immunity to measles in kidney transplanted children.
Rocca, Salvatore; Santilli, Veronica; Cotugno, Nicola; Concato, Carlo; Manno, Emma Concetta; Nocentini, Giulia; Macchiarulo, Giulia; Cancrini, Caterina; Finocchi, Andrea; Guzzo, Isabella; Dello Strologo, Luca; Palma, Paolo
2016-09-01
Vaccine-preventable diseases are a significant cause of morbidity and mortality in solid organ transplant recipients who undergo immunosuppression after transplantation. Data on immune responses and long-term maintenance after vaccinations in such population are still limited.We cross-sectionally evaluated the maintenance of immune response to measles vaccine in kidney transplanted children on immunosuppressive therapy. Measles-specific enzyme-linked immunosorbent assay and B-cell enzyme-linked immunosorbent spot were performed in 74 kidney transplant patients (Tps) and in 23 healthy controls (HCs) previously vaccinated and tested for humoral protection against measles. The quality of measles antibody response was measured by avidity test. B-cell phenotype, investigated via flow cytometry, was further correlated to the ability of Tps to maintain protective humoral responses to measles over time.We observed the loss of vaccine-induced immunity against measles in 19% of Tps. Nonseroprotected children showed signs of impaired B-cell distribution as well as immune senescence and lower antibody avidity. We further reported as time elapsed between vaccination and transplantation, as well as the vaccine administration during dialysis are clinical factors affecting the maintenance of the immune memory response against measles.Tps present both quantitative and qualitative alterations in the maintenance of protective immunity to measles vaccine. Prospective studies are needed to optimize the vaccination schedules in kidney transplant recipients in order to increase the immunization coverage over time in this population.
NASA Astrophysics Data System (ADS)
Silber, Armin; Gonzalez, Christian; Pino, Francisco; Escarate, Patricio; Gairing, Stefan
2014-08-01
With expanding sizes and increasing complexity of large astronomical observatories on remote observing sites, the call for an efficient and recourses saving maintenance concept becomes louder. The increasing number of subsystems on telescopes and instruments forces large observatories, like in industries, to rethink conventional maintenance strategies for reaching this demanding goal. The implementation of full-, or semi-automatic processes for standard service activities can help to keep the number of operating staff on an efficient level and to reduce significantly the consumption of valuable consumables or equipment. In this contribution we will demonstrate on the example of the 80 Cryogenic subsystems of the ALMA Front End instrument, how an implemented automatic service process increases the availability of spare parts and Line Replaceable Units. Furthermore how valuable staff recourses can be freed from continuous repetitive maintenance activities, to allow focusing more on system diagnostic tasks, troubleshooting and the interchanging of line replaceable units. The required service activities are decoupled from the day-to-day work, eliminating dependencies on workload peaks or logistic constrains. The automatic refurbishing processes running in parallel to the operational tasks with constant quality and without compromising the performance of the serviced system components. Consequentially that results in an efficiency increase, less down time and keeps the observing schedule on track. Automatic service processes in combination with proactive maintenance concepts are providing the necessary flexibility for the complex operational work structures of large observatories. The gained planning flexibility is allowing an optimization of operational procedures and sequences by considering the required cost efficiency.
Improving hydraulic excavator performance through in line hydraulic oil contamination monitoring
NASA Astrophysics Data System (ADS)
Ng, Felix; Harding, Jennifer A.; Glass, Jacqueline
2017-01-01
It is common for original equipment manufacturers (OEMs) of high value products to provide maintenance or service packages to customers to ensure their products are maintained at peak efficiency throughout their life. To quickly and efficiently plan for maintenance requirements, OEMs require accurate information about the use and wear of their products. In recent decades, the aerospace industry in particular has become expert in using real time data for the purpose of product monitoring and maintenance scheduling. Significant quantities of real time usage data from product monitoring are commonly generated and transmitted back to the OEMs, where diagnostic and prognostic analysis will be carried out. More recently, other industries such as construction and automotive, are also starting to develop capabilities in these areas and condition based maintenance (CBM) is increasing in popularity as a means of satisfying customers' demands. CBM requires constant monitoring of real time product data by the OEMs, however the biggest challenge for these industries, in particular construction, is the lack of accurate and real time understanding of how their products are being used possibly because of the complex supply chains which exist in construction projects. This research focuses on current dynamic data acquisition techniques for mobile hydraulic systems, in this case the use of a mobile inline particle contamination sensor; the aim was to assess suitability to achieve both diagnostic and prognostic requirements of Condition Based Maintenance. It concludes that hydraulic oil contamination analysis, namely detection of metallic particulates, offers a reliable way to measure real time wear of hydraulic components.
Deployable bamboo structure project: A building life-cycle report
NASA Astrophysics Data System (ADS)
Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.
2017-11-01
Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.
Ford, Alexander C; Khan, Khurram J; Sandborn, William J; Kane, Sunanda V; Moayyedi, Paul
2011-12-01
Maintenance therapy with 5-aminosalicylates (5-ASAs) is recommended in patients with quiescent ulcerative colitis (UC), but compliance rates are low. Once-daily dosing may improve adherence, but impact on the relapse of disease activity is unclear as no previous meta-analysis has studied this issue. MEDLINE, EMBASE, and the Cochrane central register of controlled trials were searched (through April 2011). Eligible randomized controlled trials (RCTs) recruited adults with quiescent UC, and compared once-daily dosing of 5-ASAs with a more frequent dosing schedule of an identical total daily dose of the same 5-ASA drug. Minimum treatment duration was 6 months. Trials reported a dichotomous assessment of relapse of disease activity at last point of follow-up. Data concerning non-compliance and adverse events were extracted, where reported. Effect of once-daily vs. more frequent dosing schedule was reported as relative risk (RR) of relapse with a 95% confidence interval (CI). The search identified 3,061 citations, and seven RCTs containing 2,745 patients were eligible. All RCTs used mesalamine. Relapse rates were not significantly different between once-daily and conventional dosing schedules for mesalamine (RR of relapse=0.94; 95% CI: 0.82-1.08). Non-compliance (RR=0.87; 95% CI: 0.46-1.66) and adverse events were no more likely with once-daily dosing (RR=1.08; 95% CI: 0.97-1.20). Once-daily dosing with mesalamine is as effective as conventional dosing schedules for the prevention of relapse of quiescent UC, although there is no definitive evidence that compliance with once-daily dosing is better. Adverse events occur at a similar frequency.
Íbias, Javier; Miguéns, Miguel; Pellón, Ricardo
2016-09-01
The spontaneously hypertensive rat (SHR) has been proposed as an animal model for attention deficit hyperactivity disorder (ADHD), and typically develops excessive patterns of response under most behavioural protocols. Schedule-induced polydipsia (SIP) is the excessive water consumption that occurs as a schedule effect when food is intermittently delivered and animals are partially food- but not water-deprived. SIP has been used as a model of excessive behaviour, and considerable evidence has involved the dopaminergic system in its development and maintenance. The aim of this study was to evaluate the effects of the most common psychostimulants used in ADHD treatment on SIP, comparing their effects in SHRs with rats from control populations. SHR, Wistar Kyoto (WKY) and Wistar rats were submitted to a multiple fixed time (FT) food schedule with two components: 30 s and 90 s. The acute effects of different dopaminergic compounds were evaluated after 40 sessions of SIP acquisition. All animals showed higher adjunctive drinking under FT 30 s than FT 90 s, and SHRs displayed higher asymptotic SIP levels in FT 90 s compared to WKY and Wistar rats. SHRs were less sensitive to dopaminergic agents than control rats in terms of affecting rates of adjunctive drinking. These differences point to an altered dopaminergic system in the SHR and provide new insights into the neurobiological basis of ADHD pharmacological treatments. © The Author(s) 2016.
PanDA Pilot Submission using Condor-G: Experience and Improvements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhao X.; Hover John; Wlodek Tomasz
2011-01-01
PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison.more » In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.« less
Estimation of probability of failure for damage-tolerant aerospace structures
NASA Astrophysics Data System (ADS)
Halbert, Keith
The majority of aircraft structures are designed to be damage-tolerant such that safe operation can continue in the presence of minor damage. It is necessary to schedule inspections so that minor damage can be found and repaired. It is generally not possible to perform structural inspections prior to every flight. The scheduling is traditionally accomplished through a deterministic set of methods referred to as Damage Tolerance Analysis (DTA). DTA has proven to produce safe aircraft but does not provide estimates of the probability of failure of future flights or the probability of repair of future inspections. Without these estimates maintenance costs cannot be accurately predicted. Also, estimation of failure probabilities is now a regulatory requirement for some aircraft. The set of methods concerned with the probabilistic formulation of this problem are collectively referred to as Probabilistic Damage Tolerance Analysis (PDTA). The goal of PDTA is to control the failure probability while holding maintenance costs to a reasonable level. This work focuses specifically on PDTA for fatigue cracking of metallic aircraft structures. The growth of a crack (or cracks) must be modeled using all available data and engineering knowledge. The length of a crack can be assessed only indirectly through evidence such as non-destructive inspection results, failures or lack of failures, and the observed severity of usage of the structure. The current set of industry PDTA tools are lacking in several ways: they may in some cases yield poor estimates of failure probabilities, they cannot realistically represent the variety of possible failure and maintenance scenarios, and they do not allow for model updates which incorporate observed evidence. A PDTA modeling methodology must be flexible enough to estimate accurately the failure and repair probabilities under a variety of maintenance scenarios, and be capable of incorporating observed evidence as it becomes available. This dissertation describes and develops new PDTA methodologies that directly address the deficiencies of the currently used tools. The new methods are implemented as a free, publicly licensed and open source R software package that can be downloaded from the Comprehensive R Archive Network. The tools consist of two main components. First, an explicit (and expensive) Monte Carlo approach is presented which simulates the life of an aircraft structural component flight-by-flight. This straightforward MC routine can be used to provide defensible estimates of the failure probabilities for future flights and repair probabilities for future inspections under a variety of failure and maintenance scenarios. This routine is intended to provide baseline estimates against which to compare the results of other, more efficient approaches. Second, an original approach is described which models the fatigue process and future scheduled inspections as a hidden Markov model. This model is solved using a particle-based approximation and the sequential importance sampling algorithm, which provides an efficient solution to the PDTA problem. Sequential importance sampling is an extension of importance sampling to a Markov process, allowing for efficient Bayesian updating of model parameters. This model updating capability, the benefit of which is demonstrated, is lacking in other PDTA approaches. The results of this approach are shown to agree with the results of the explicit Monte Carlo routine for a number of PDTA problems. Extensions to the typical PDTA problem, which cannot be solved using currently available tools, are presented and solved in this work. These extensions include incorporating observed evidence (such as non-destructive inspection results), more realistic treatment of possible future repairs, and the modeling of failure involving more than one crack (the so-called continuing damage problem). The described hidden Markov model / sequential importance sampling approach to PDTA has the potential to improve aerospace structural safety and reduce maintenance costs by providing a more accurate assessment of the risk of failure and the likelihood of repairs throughout the life of an aircraft.
Informed maintenance for next generation space transportation systems
NASA Astrophysics Data System (ADS)
Fox, Jack J.
2001-02-01
Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives-maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring system software. This paper will summarize NASA's long-term strategy, development, and implementation plans for Informed Maintenance for next generation RLVs. This will be done through a convergence into a single IM vision the work being performed throughout NASA, industry and academia. Additionally, a current status of IM development throughout NASA programs such as the Space Shuttle, X-33, X-34 and X-37 will be provided and will conclude with an overview of near-term work that is being initiated in FY00 to support NASA's 2nd Generation Reusable Launch Vehicle Program. .
Informed maintenance for next generation reusable launch systems
NASA Astrophysics Data System (ADS)
Fox, Jack J.; Gormley, Thomas J.
2001-03-01
Perhaps the most substantial single obstacle to progress of space exploration and utilization of space for human benefit is the safety & reliability and the inherent cost of launching to, and returning from, space. The primary influence in the high costs of current launch systems (the same is true for commercial and military aircraft and most other reusable systems) is the operations, maintenance and infrastructure portion of the program's total life cycle costs. Reusable Launch Vehicle (RLV) maintenance and design have traditionally been two separate engineering disciplines with often conflicting objectives - maximizing ease of maintenance versus optimizing performance, size and cost. Testability analysis, an element of Informed Maintenance (IM), has been an ad hoc, manual effort, in which maintenance engineers attempt to identify an efficient method of troubleshooting for the given product, with little or no control over product design. Therefore, testability deficiencies in the design cannot be rectified. It is now widely recognized that IM must be engineered into the product at the design stage itself, so that an optimal compromise is achieved between system maintainability and performance. The elements of IM include testability analysis, diagnostics/prognostics, automated maintenance scheduling, automated logistics coordination, paperless documentation and data mining. IM derives its heritage from complimentary NASA science, space and aeronautic enterprises such as the on-board autonomous Remote Agent Architecture recently flown on NASA's Deep Space 1 Probe as well as commercial industries that employ quick turnaround operations. Commercial technologies and processes supporting NASA's IM initiatives include condition based maintenance technologies from Boeing's Commercial 777 Aircraft and Lockheed-Martin's F-22 Fighter, automotive computer diagnostics and autonomous controllers that enable 100,000 mile maintenance free operations, and locomotive monitoring system software. This paper will summarize NASA's long-term strategy, development, and implementation plans for Informed Maintenance for next generation RLVs. This will be done through a convergence into a single IM vision the work being performed throughout NASA, industry and academia. Additionally, a current status of IM development throughout NASA programs such as the Space Shuttle, X-33, X-34 and X-37 will be provided and will conclude with an overview of near-term work that is being initiated in FY00 to support NASA's 2 nd Generation Reusable Launch Vehicle Program.
1985-12-01
Lobster Shop - 759-2165. 4013 Ruston Way. Known for excellent seafood. Nautical The Bay Co. - 752-6661. 3327 Ruston Way. Various entrees. CI Shenanigans ...se- RCRA permit is inappropriate." Ac- forms of financial responsibility for rious potential health problem in New cording to Rogers and Darrah, under...admini- strative, monitoring, and financial standards for them. EPA will use these independently enforceable standards to issue permits to owners
Solving nuts-and-bolts nuclear problems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olmstead, A.; Schoen, J.
1979-05-01
The Operations and Maintenance Information Service (MIS), created and operated by NUS Corp., was designed to improve plant availability through the exchange of practical information between nuclear plants and a return to an emphasis on the problem-solving process. MIS meetings cover a range of plant problems and have been unique in bringing the rapid feedback of information pertinent to the day-to-day working operation of a total plant. Much of the response is by telephone contact, although the monthly newsletter, semi-annual meetings, and scheduled plant visits are also helpful.
Prescribing physical activity for older patients.
Kligman, E W; Pepin, E
1992-08-01
Regular exercise is an effective nonpharmacologic therapy for stress, sleep disorders, depression, and anxiety, as well as such chronic conditions of aging as hypertension, obesity, diabetes mellitus, coronary artery disease, hyperlipidemia, and constipation. Pre-exercise office assessment of cardiac risk, possible limitations, and contraindications is advised. A balanced fitness training program includes activities to increase flexibility, strength, and cardiovascular endurance. The most effective exercise prescription begins with a type of aerobic activity the patient enjoys. A prescribed schedule of stepwise increments in frequency, duration, and intensity gradually leads to a maintenance level of fitness.
Rocuronium bromide induced anaphylaxis in a child -A case report-
Kim, Sang Gyu; Son, Yong Hoon; Park, Joon Mo
2010-01-01
Anaphylaxis or anaphylactoid reaction in pediatric patient during anesthesia is rare. We report a rocuronium induced anaphylactic reaction in a 33-month-old female. The patient was scheduled to undergo escharectomy due to injuries suffered from a major burn. Shortly after administration of rocuronium, the patient developed severe hypotension, tachycardia, and hypoxia. A similar reaction occurred after administration of rocuronium on subsequent anesthesia. She underwent uneventful anesthesia with volatile induction and maintenance of anesthesia with sevoflurane on her next 7 operations without using of muscle relaxant. PMID:21253379
2007-08-20
KENNEDY SPACE CENTER, FLA. -- A poster in the Space Station Processing Facility, or SSPF, at NASA's Kennedy Space Center illustrates the assembled Dextre, the third and final component of the mobile servicing system on the International Space Station. The Special Purpose Dexterous Manipulator will work with the mobile base and Canadarm2 on the station to perform critical construction and maintenance tasks. The poster sits in front of the draped sections in the SSPF. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14, 2008. Photo credit: NASA/George Shelton
2007-08-20
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, or SSPF, at NASA's Kennedy Space Center, sections of the Special Purpose Dexterous Manipulator, known as Dextre, are lined up under cover. In front of them is a poster that illustrates the assembled third and final component of the mobile servicing system on the International Space Station. Dextre will work with the mobile base and Canadarm2 on the station to perform critical construction and maintenance tasks. Dextre is part of the payload scheduled on mission STS-123, targeted to launch Feb. 14, 2008. Photo credit: NASA/George Shelton
2008-02-11
S122-E-007850 (11 Feb. 2008) --- Astronaut Stanley Love, STS-122 mission specialist, participates in the first scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the almost eight-hour spacewalk, Love and astronaut Rex Walheim (out of frame), mission specialist, installed a grapple fixture on the Columbus laboratory and prepared electrical and data connections on the module while it rested inside Space Shuttle Atlantis' payload bay. The crewmembers also began work to replace a large nitrogen tank used for pressurizing the station's ammonia cooling system.
2008-02-11
S122-E-007853 (11 Feb. 2008) --- Astronaut Stanley Love, STS-122 mission specialist, participates in the first scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the almost eight-hour spacewalk, Love and astronaut Rex Walheim (out of frame), mission specialist, installed a grapple fixture on the Columbus laboratory and prepared electrical and data connections on the module while it rested inside Space Shuttle Atlantis' payload bay. The crewmembers also began work to replace a large nitrogen tank used for pressurizing the station's ammonia cooling system.
2008-02-11
S122-E-007771 (11 Feb. 2008) --- Astronaut Stanley Love, STS-122 mission specialist, participates in the first scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the almost eight-hour spacewalk, Love and astronaut Rex Walheim (out of frame), mission specialist, installed a grapple fixture on the Columbus laboratory and prepared electrical and data connections on the module while it rested inside Space Shuttle Atlantis' payload bay. The crewmembers also began work to replace a large nitrogen tank used for pressurizing the station's ammonia cooling system.
2008-02-11
S122-E-007794 (11 Feb. 2008) --- Astronaut Stanley Love, STS-122 mission specialist, participates in the first scheduled session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the almost eight-hour spacewalk, Love and astronaut Rex Walheim (out of frame), mission specialist, installed a grapple fixture on the Columbus laboratory and prepared electrical and data connections on the module while it rested inside Space Shuttle Atlantis' payload bay. The crewmembers also began work to replace a large nitrogen tank used for pressurizing the station's ammonia cooling system.
1986-06-06
Washington D.C.: Office of Air Force History, 1978), pp. 234, 241, 254, ?59. 3 Knaack, Post- Worl -g War 11 Fighters, p. 254. 7 CHAPTER 2 HISTORICAL...The F-IlIA in Southeast Asia: 19 Second Deployment The F-I11B 22 The F-111C 25 The F-1111 25 The F-1IE 30 The F-1I1F 33 iv...Sortie 98 3-13 Maintenance Plan / Scheduling Effectiveness 99 3-14 War Readiness Spares Kit (WRSK) Fill Rate 99 3-15 WRSK / BLSS Withdrawals 100 3-16
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The report describes the application of EPA's waste minimization assessment procedures to a torpedo maintenance facility at the Naval Undersea Warfare Engineering Station, Keyport, WA. The assessment focused on the Mark 48 shop and the Mark 46 shop. These shops service the Mark 48 torpedo and the Mark 46 torpedo respectively. The five waste minimization options presented are volume reduction of contaminated clothing, automated cleaning of parts, automated fuel tank draining, modification of the deep sink draining schedule and recycling of mineral spirits.
STS-87 Columbia rolls out to LC 39B in preparation for launch
NASA Technical Reports Server (NTRS)
1997-01-01
The orbiter Columbia, mated to its external tank and two solid rocket boosters, is prepared to roll out of Kennedy Space Centers (KSCs) Vehicle Assembly Building (VAB) to Pad 39-B. Columbia is scheduled to launch on Nov. 19 for STS-87 on a 16-day flight of the United States Microgravity Payload (USMP)-4 mission. This mission also features the deployment and retrieval of the Spartan-201 satellite and a spacewalk to demonstrate assembly and maintenance operations for future use on the International Space Station.
2000-12-07
KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training at SPACEHAB, in Cape Canaveral, Fla., members of the STS-107 crew learn about Biological Research in Canisters (BRIC) experiments that will be on their mission. From left Commander Rick D. Husband and Payload Specialist Ilan Ramon of Israel look over paperwork. Mission Specialists David M. Brown and Michael Anderson (center) look at the way Debbie Wells of Bionetics manipulates part of the equipment. STS-107 will carry a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. Looking over an OSTEO experiment and paperwork are (left to right) Commander Rick D. Husband; Mission Specialists Laurel Clark, David M. Brown and Ilan Ramon of Israel; and Pilot William C. “Willie” McCool. As a research mission, STS-107will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-07
KENNEDY SPACE CENTER, FLA. -- As part of In-Flight Maintenance training at SPACEHAB, in Cape Canaveral, Fla., members of the STS-107 crew learn about Biological Research in Canisters (BRIC) experiments that will be on their mission. From left Commander Rick D. Husband and Payload Specialist Ilan Ramon of Israel look over paperwork. Mission Specialists David M. Brown and Michael Anderson (center) look at the way Debbie Wells of Bionetics manipulates part of the equipment. STS-107 will carry a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001
2000-12-06
KENNEDY SPACE CENTER, FLA. -- Members of the STS-107 crew take part in In-Flight Maintenance training for their mission. Looking over an OSTEO experiment and paperwork are (left to right) Commander Rick D. Husband; Mission Specialists Laurel Clark, David M. Brown and Ilan Ramon of Israel; and Pilot William C. “Willie” McCool. As a research mission, STS-107will carry the SPACEHAB Double Module in its first research flight into space and a broad collection of experiments ranging from material science to life science. It is scheduled to launch July 19, 2001